Mull Campus Engagement Strategy
Appendix 1

Page 2

Ryder Architecture Limited
Cooper’s Studios
14-18 Westgate Road
Newcastle upon Tyne  
NE1 3NN
United Kingdom
T: +44 (0)191 269 5454 
www.ryderarchitecture.com

Page 3

Introduction
Engagement
Effective Engagement – Understanding Place
The new Mull Campus project is a unique opportunity to be an
exemplar for island community engagement, using a Placebased
approach to help inform the decision making process.  A Placebased
approach is one that takes a collaborative, joined up approach to a
place’s services and assets, involving communities in the decisions that
directly affect them.  There are several strands to the engagement and
briefing process, all of which have an understanding of place at their
heart.  We will begin engagement with a Place review and extensive
community engagement to establish the key drivers and considerations
across all communities.
This Placebased approach runs through all subsequent activities, tying
them together in the context of the needs of the islands.
Site Selection
The development of not only the campus brief, but the site identification
and assessment process will require engagement with a wide range
of stakeholders and partners.  This engagement will meet the National
Standards for Community Engagement and the United Nations
Conventions for the Rights of Children. The  selection criteria will be
defined through the Islands wide Place review and engagement with
local communities so they accurately reflect the key drivers of those
who will be most impacted by the new campus.  Arriving at a preferred
site in a transparent, accountable manner supported by data will allow
formal consultation under the Schools (Consultation) (Scotland) Act
2010 to be carried out, before commencing the Intelligent Briefing
process based on a defined site.   
Intelligent Briefing
The Intelligent Briefing process establishes a clear vision for the project
– what are we trying to achieve, and why? – underpinned by a clear
educational brief and a set of well defined success criteria.  A set of
more detailed SMART objectives (Specific, Measurable, Achievable,
Relevant, Timely) will also be developed, which allow us to measure
specific aspects of the design as it emerges, and once the building
is in use.  As the concept design is developed, it will be continually
tested against these objectives and other options, to make sure it is still
meeting the agreed aims. 
An Intelligent Brief is one that develops over time, building on knowledge
that is gained though careful and meaningful engagement with the
community and other stakeholders, supported by an understanding of
the place itself, alongside the technical and statutory work that is so
important to ensure we develop realistic and achievable options.  It is a
collaborative and holistic approach, with all of these strands feeding into
each other to build up a truly comprehensive picture.   
We will engage in five distinct engagement streams to develop the
Intelligent Brief:
1 Place brief:  This stream will involve Argyll and Bute leadership and
partner organisations in a series of workshops to understand current
challenges and ambitions for service delivery in the agreed location. 
This will define a statement of Place needs, which will then shape
a project vision.  This vision will be underpinned by clear, SMART
objectives forming a Place brief, which wraps around the educational
brief.
2 Educational brief: A series of workshops which define strategic
educational objectives, the learner journey and relationships and
adjacencies.  The stream then moves on to understand context
and Scottish Futures Trust (SFT) and Learning Estate Investment
Programme (LEIP) metric compliance, define the key educational
design principles and space use strategy, resulting in the development
of schedules of accommodation and space characteristics.
3 Community and stakeholder ambitions: The third stream focuses
on understanding the aspirations of those who will use the campus
through a series of lively, hands on design charettes involving learners,
staff, parents and the local community.  These sessions are guided
by the established project vision, capturing people’s ambitions for the
internal and external spaces.  The aim is to ensure the community feels
a sense of ownership of emerging proposals from the early stages.
4 Technical brief: The fourth stream is centred on defining the
performance requirements of the campus, including the energy
strategy, approach to Net Zero Carbon, building fabric, and whole life
maintenance and operation. 
5 Statutory consultees: The final stream looks to inform the feasibility
study findings and de risk the project by engaging with statutory
consultees from the outset, with particular focus given to Health and
Safety Executive (HSE), Scottish Environment Protection Agency
(SEPA), Historic Environment Scotland where appropriate and Argyll and
Bute Planning to build good relationships.
We will also make use of design sprints (concentrated workshops
over several days) at key stages in the feasibility study to validate the
briefing findings and identify preferred site strategies.  This will result
in the output of a complete Place led Intelligent Brief, which covers
Place needs, vision, objectives, educational drivers, schedules of
accommodation and adjacency matrix to inform the feasibility work. 
National Standards for Community Engagement
We will conduct all engagement in line with the seven National
Standards for Community Engagement, taking care to support by
using methods that are fit for purpose and help to overcome barriers
to participation, such as offering a range of times and ways to provide
feedback.  We will plan carefully and work together to achieve the
aims of the project, basing all decisions on a clear understanding of
the needs of the communities.  We will take an inclusive approach
that involves all affected communities and encourages all voices to be
heard.  We will communicate clearly and regularly to keep all affected
parties informed, and we will assess the impact of our engagement to
ensure we continually improve and take on board any lessons learnt.
An Island Impact Assessment will also be carried out if determined that
it is required.

Page 4

ACTION
Island Place Review
Community Engagement
Sites Identification
Site Appraisals and Selection
Intelligent Briefing
Statutory Planning Consultation
Scottish Schools Consultation
January February March April May June July August September October November December January February
SS
PEPre Consult
Formal Consult
Potential Review
Identifying where and why
The site identification and appraisal process will involve the local
community from the outset, meeting the National Standards for
Community Engagement and the United Nations Conventions for the
Rights of Children. In recognition of the sensitivity and importance of site
choice, extensive drop in sessions supported by surveys will be carried
out in locations across the islands.  Feedback surveys will remain open
throughout this phase of engagement to ensure people have the option
to attend in person or respond in their own time.  Drop in sessions will
be open in both the daytime and evening to ensure people can attend
after normal working hours. 
These surveys and drop in sessions will have two key purposes –
to understand the views and key drivers for the local community in
assessing the suitability of sites, and to offer the opportunity to bring
sites forward for consideration as part of the assessment process. 
The findings of these engagement sessions will help shape the site
selection criteria, which will be used to arrive at a preferred site for the
new campus.  Arriving at a preferred site in a transparent, accountable
manner supported by data will allow formal consultation under the
Schools (Consultation) (Scotland) Act 2010 to be carried out, before
commencing the Intelligent Briefing process based on a defined site.
This stage involves local communities, community and parent councils,
and elected members, as well as the client team, key partners and
project team for the Place review.
Formal
consultation
and review
Following a decision
on the preferred site,
formal consultation
will be undertaken
through the
Scottish Schools
(Consultation)
(Scotland) Act 2010. 
The exact form of
engagement which
will be undertaken will
depend on the choice
of site selected
(please refer to page
14).
Identifying what – Intelligent
Briefing
Intelligent Briefing is a collaborative process which
helps ensure that the new campus project meets
the wider project vision and strategic outcomes.  
Multiple engagement streams occur simultaneously
with key stakeholders and the community to ensure
that a transformational Place based strategic
education brief and technical feasibility study are
developed for the preferred site.  Key streams are:
Place brief: Workshops involving Argyll and Bute
leadership and partner organisations to understand
current challenges and ambitions for service delivery
which will then shape a project vision. This vision will
be underpinned by clear, SMART objectives forming
a Place brief, which wraps around the educational
brief.
Educational brief: Workshops with education leads
and staff to define strategic educational objectives
and the learner journey.
Community and stakeholder ambitions:
Workshops on island with learners, staff and parents
focusing on understanding the aspirations of those
who will use the campus.
Technical brief: Defining the performance
requirements of the campus, including the energy
strategy, approach to Net Zero Carbon, building
fabric, and whole life maintenance and operation.
Statutory consultees: Engagement with statutory
consultees including HSE, SEPA, Historic
Environment Scotland where appropriate and Argyll
and Bute Planning.
Developing
the design
At the conclusion
of the Intelligent
Briefing stage,
a preferred site
strategy and design
concept will have
been arrived at
which will be further
developed by the
project design
team towards a
formal Planning
Application.  As
part of this process
there will be
Pre Application
Consultation, which
will comprise drop
in sessions to be
held in various
locations, and
engagement with
local Community
Councils.

Page 5

Stakeholder Glossary
Stakeholder Description Example Participants
Argyll and Bute education team Staff will be selected from across the Education Authority depending on the skill set
required at any particular stage of the engagement
Client team The Mull Project Team – This will be defined following confirmation of a successful bid
and contact details will be provided at that point
Community councils Mull Community Council and Iona Community Council
Elected members Cllr Kain, Cllr Hume, Cllr Hampsey
Key partners Mull and Iona Development Trust (MICT), South West Mull and Iona Development
(SWMID), (North West Mull Community Woodland Company) (NWMCWC) + any other
identified through discussions with the stakeholders noted in this glossary
Local communities Any organisations considered appropriate by stakeholders noted in this glossary
Parent councils Parent Councils for Bunessan Primary, Dervaig Primary, Iona Primary, Lochdonhead
Primary, Salen Primary, Tobermory 2-18 Campus, Ulva Primary
Primary and secondary pupils Primary and Secondary age pupils affected (including those who board and attend Oban
High School)
Primary and secondary staff Primary and Secondary staff affected by the project.
Project team To be determined once the Funding Announcement is made and the Project Partners are
determined
Statutory Argyll and Bute Planning, SEPA, HSE (PADHI+) and Historic Environment Scotland where
relevant
Technical Argyll and Bute Council FM, refuse, transport, energy and estates teams
Technical support To be determined once the Funding Announcement is made and the Project Partners are
determined

Page 6

Island Place Review
Who? What? When? How?
Project Leadership: client
team, key partners (which
includes wider community
stakeholders), project team,
and pupil representation
where appropriate
A Placebased assessment
of the challenges and
opportunities which are
offered by the creation of
a new campus on Mull, to
provide understanding of
what successful outcomes
will look like from a service
delivery perspective to
inform the site selection
assessment criteria.
Workshop IP 1 (mid
Jan): Opportunities and
challenges of a new campus
in the wider islands context
Workshop IP 2 (mid Feb):
Understanding successful
outcomes in the wider
islands context.
Led by Argyll and Bute
Council supported by
project partners including
hub North and NA, sessions
will be in workshop format
on island, supported
by the use of Qualtrics
survey software to capture
additional ideas during and
after the session, and to
include anyone unable to
attend in person.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 7

Community Engagement – Key Drivers for Location
Who? What? When? How?
Local communities, pupils,
community councils, parent
councils and elected
members
A series of in person
consultation sessions
across the islands to listen
to what communities believe
are the key issues to be
taken into consideration
when assessing the location
for a new campus on Mull,
and to offer the opportunity
to bring sites forward for
consideration as part of the
assessment process.
Throughout February, with
allowance for additional
promotion and engagement
if required to reach a broad
audience.
Sessions should ideally
cover more than one day
in each location, and
should cover both daytime
and evening to maximise
attendance.
Led by Argyll and Bute Council with
support from our project partners, in
person public drop in sessions in all
affected communties across islands,
with findings captured via survey –
physical and online.
Members of the team can complete
feedback forms with people during
the session, and / or distribute
leaflets with survey links and QR
codes for completion later.  The
feedback surveys will remain open
for a period after each event and
can be further promoted on island
for those unable to attend.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 8

Sites Identification, Site Appraisal and Selection
Who? What? When? How?
Project Leadership:
client team, community
stakeholders, pupils, key
partners and project team
with technical support
A transparent process to
determine the best location
for the new campus on
Mull based on criteria
informed by the Islands
wide Placebased review,
Community feedback and
technical considerations.
January - Mid May The initial period running
concurrently with the Islands
Placebased review will identify
viable sites in a range of locations
across the island to ensure a
diverse range of strategic scenarios
can be assessed, as well as the
development potential of sites.
Locations and sites will then be
assessed against agreed criteria
and scored to arrive at a preferred
solution which will form the basis
of formal consultation under the
Schools (Consultation) (Scotland)
Act 2010. Assessment will involve
technical support for many of the
key criteria including transport and
active travel, operational carbon
impact, economic impact and site
hydrology.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 9

Intelligent Briefing – Place, Vision and Objectives
Who? What? When? How?
Project Leadership: client
team, key partners (which
includes wider community
stakeholders), project Team,
and pupil representation
where appropriate
Led by Hub North and
Argyll and Bute Council with
support from our project
partners, a Placebased
review to fully understand
the potential and maximise
the benefits of the creation
of a campus on Mull in the
preferred location, agreeing
the project vision, outcomes
and success measures,
informing the development
of early design proposals.
Workshop PB1 (early Sep):
Understanding Place and
Ambition
Workshop PB2 (end Sep):
Defining Vision and Setting
Objectives
Workshop PB3 (mid Oct):
Propositions
Led by Argyll and Bute
Council with support
from our project partners,
sessions will be in
workshop format on island,
supported by the use of
Qualtrics survey software.
The SFT Briefing and
Evaluation Framework
will be used to capture
key findings and validate
design throughout the
development, construction
and operational stages.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 10

Intelligent Briefing – Developing the Educational Brief
Who? What? When? How?
Argyll and Bute Education
Team, Bord Na Gaelic
Building on work from the
Learning Estate Investment
Programme (LEIP)
application, a workstream
to develop an educational
vision and brief, space
typologies and a schedule
of accommodation capable
of delivering 21st century
learning environments
that will meet the specific
needs of the islands. This
workstream informs the
Placebased Approach and
Technical workstreams in an
iterative manner.
Workshop LC1 (mid Sep):
Understanding educational
objectives and lessons
learnt
Workshop LC2 (early Oct):
Emerging educational
themes
Workshop LC3 (end Oct): 
Brief testing workshop,
developing space typologies
and the schedule of
accommodation
Led by The Learning Crowd,
these workshops will be
facilitated via Teams or in
person.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 11

Intelligent Briefing – Stakeholders Engagement
Who? What? When? How?
Pupils at key stages of
education, staff, and parent
council representation, Bord
Na Gaelic
A series of interactive
design charettes to
understand the ambitions
and aspirations of a range
of user groups for the new
campus, which will inform
the development of initial
design options.
Design Charette SE1 (end Sep): A
learning landscape – connections
with the wider setting
Design Charette SE2 (mid Oct):
Aspirations for learning and working
– understanding core spaces
Design Charette SE3 (mid Nov):
Understanding shared spaces
Feedback review SE4 (mid Dec):
Ongoing engagement - as design
options emerge, a series of
engagement sessions will be held
to both appraise stakeholders of
progress and inform the developing
design
Led by Argyll and Bute
Council with support from
our project partners, a series
of interactive workshops will
be held on island across the
day involving the full range
of user groups to capture
key feedback.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 12

Intelligent Briefing – Developing the Technical Brief
Who? What? When? How?
Argyll and Bute Council
facilities management,
refuse, transport, energy
and estates teams
A workstream to define
the building performance
requirements and define the
Net Zero Carbon strategy,
in addition to understanding
maintenance and servicing
requirements, all to inform
emerging design proposals.
Workshop TB1 (end Sep):
Understanding energy
strategy, LEIP requirements
and approach to Net Zero
Workshop TB2 (end Oct):
Meeting LEIP requirements
Workshop TB3 (end Nov):
Site access, parking, EV and
transport matters
Workshop TB4 (end Dec):
Understanding maintenance
and servicing needs
Led by Argyll and Bute
Council with support from
our project partners, these
workshops will be primarily
facilitated over Teams, with
key decisions and findings
captured in the technical
brief.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 13

Intelligent Briefing – Statutory Planning Consultation
Who? What? When? How?
Argyll and Bute Planning,
Scottish Environment
Protection Agency
(SEPA), Health and Safety
Executive (HSE) and Historic
Environment Scotland
where relevant
Statutory consultees have
a key role to play in both
the initial site appraisal
exercise, and in the
development of emerging
campus proposals once a
site is selected. The ultimate
output will be securing
the appropriate consents
in good time through a
collaborative approach.
Consultation SC1 (Feb): Statutory
consultee review of proposed site
locations
Consultation SC2 (end Sep): Engaging
statutory consultees in the Placebased
process
Consultation SC3 (end Oct): Review of
emerging campus design options
Consultation SC4 and submission of PAN
Notice (mid Dec): Review of preferred
design option, and lodging of Proposal of
Application Notice (PAN) to commence the
Pre-Application Consultation period (PAC)
Public event 1 (end Jan): Public drop in
event to display emerging themes and
ideas for the new campus
Public event 2 (mid Mar): Public drop in
event to display the developed campus
design, demonstrating how feedback from
the first public event has informed it.
Led by Argyll and Bute Council
project team, the site review will
be facilitated over Teams or in
person as required. Further sessions
with statutory consultees will be
conducted using in person and
Teams meetings. Public drop in
sessions required as part of the
PAN process will be advertised and
held in accordance with statutory
requirements in an accessible
location on island, and will make
use of online portals and physical
feedback forms.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement

Page 14

Scottish Schools Consultation
Who? What? When? How?
The statutory stakeholders for this consultation exercise
are determined by the type of “relevant proposal” that is
adopted under Schedule 1 of the Act – i.e. it will depend
on whether a proposal is formulated to establish a
new school; to relocate a school or schools; to close a
school or schools; etc. The respective lists of “relevant
consultees” corresponding with the type of relevant
proposal being considered, are set out in Schedule 2 to
the 2010 Act. The following consultees are common to
every proposal arising under the 2010 Act:
• The Parent Council or Combined Parent Council of
any affected school;
• The parents of the pupils at any affected school;
• The parents of any children expected by the
Education Authority to attend any affected school
within two years of the date of publication of the
proposal paper;
• The pupils at any affected school (insofar as the
Education Authority considers them to be of a
suitable age an maturity);
• The staff (teaching and other) at any affected school;
• Any trade union which appears to the Education
Authority to be representative of the staff, including
teaching and other staff;
• Any other education authority that the Education
Authority advancing the proposal considers relevant.
If the proposal affects the provision of Gaelic medium
education, Bòrd na Gàidhlig is an additional relevant
consultee.
A statutory consultation
exercise will proceed in
accordance with the Schools
(Consultation) (Scotland) Act
2010. The entire exercise will
broadly follow the process
and requirements as set out in
the 2010 Act, but the precise
methodology to be applied will
depend on the specific type of
relevant proposal, or proposals,
adopted (i.e. establishing a new
school, relocating a school or
schools, closing a school or
schools, redrawing a school’s
catchment area, etc.)
The timescale and periods
will be provided once the
proposal is determined in 
accordance with the 2010
Act.
Argyll and Bute Council’s
Education Service will formulate
a draft proposal in terms of the
2010 Act, and if approved by the
Community Services Committee
this proposal will be subject to the
statutory consultation process. The
consultation is to be open for a
minimum of six weeks, including at
least 30 school days and Education
Scotland will be involved in the
process and shall report on the likely
educational benefits of the proposal.
During the consultation period, a
public meeting would be held for all
stakeholders, and the wider public,
to discuss the proposal in more
detail with the Education Authority
and have their views recorded.
After the consultation has closed,
Education Scotland will prepare
and provide their report on the
educational benefits of the proposal.
The Education Authority will
thereafter take a decision as to
implementation of the proposal.
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why Formal Consulatation and Review Identifying what - Intelligent Briefing Developing the design
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
ACTION
Island Place Review
On Island Engagement - Key
Drivers for Location
Sites Identification
Site Appraisals and Selection
Place, Vision and Objectives
Developing the Educational
Brief
Stakeholders Engagement
Developing the Technical Brief
Statutory Planning Consultation
Schools Consultation
Testing Options
Develop Preferred Concept
Island Community Impact
Assessment
January February March April May June July August September October November December January February
Identifying where and why? Consulatation and Review Identifying what - Intelligent Briefing How? - Hub Stage 1
IP1 IP2
IE1 IE2 IE3
SS1 SS2 SS3 SS4
PB1 PB2 PB3
LC1 LC2 LC3
SE1 SE2 SE3 SE4 SE5
TB1 TB2 TB3 TB4
SC1 SC2 SC3 SC4 SC5
PEPre Consult Formal Consult Potential Review
Compliant with National Standards for Community Engagement
Potential Review

Page 15

Pledge
This is our pledge to you in how we intend to engage with you to deliver our engagement strategy.  We look forward to
working with all communities in a mutually respectful and professional manner.  In the spirit of the National Standards for
Community Engagement, we hope to work together with communities in an inclusive and meaningful way so that we can
listen carefully to all voices and views.
The preferred and most effective line of communication is via Mull.Campus@argyll-bute.gov.uk, which allows us to capture
all questions and comments in one place. In our team’s experience, delivering new schools from concept to occupation
is typically a five year journey, and therefore constructive relationships are key to success. We aim to put young people,
community and engagement at the heart of the process.

Page 16

Appendix
Statutory Consultation

Page 17

This Appendix provides an overview of the statutory consultation
process which will apply to any proposal adopted in terms of the
Schools (Consultation) (Scotland) Act 2010.
Introduction
The Schools (Consultation) (Scotland) Act 2010 provides that before
proceeding with certain proposals in relation to a school, an Education
Authority must comply with some initial requirements. These are:
a To prepare an educational benefits statement
b To prepare and publish a proposal paper
c To give notice of the proposal to the relevant consultees and invite
representations
d To hold a public meeting
e To involve Her Majesty’s Inspectors of Education (HMIE) in the
process
The Education Authority must then review their proposal and prepare
and publish a Consultation Report. Only when all of the above
requirements have been complied with, may an Education Authority
decide to implement a proposal, whether wholly or in part, or actually
implement the proposal in whole or in part.
Relevant Proposals
The 2010 Act applies where an Education Authority has formulated a
“relevant proposal” in relation to any school. A list of such qualifying
proposals is found in Schedule 1 to the Act. They are:
1 A closure proposal (this includes discontinuing a whole school, or
stage of education within a school)
2 a proposal to establish a new school or stage of education at a
school
3 a proposal to relocate (in whole or in part) a school or nursery class
4 a proposal to vary admission arrangements for a school including
a proposal to establish, terminate or otherwise alter the catchment
area of a school
5 a proposal to make or modify guidelines in respect of the handling of
placing requests
6 a proposal to vary the arrangements for the transfer of pupils from a
primary school to a secondary school
7 a proposal to change the school commencement date of a primary
school
8 a proposal to vary arrangements for the constitution of a special
class in a school other than a special school
9 a proposal to discontinue arrangements for the provision of transport
by the education authority for pupils attending a denominational
school
10 a proposal to change a denominational school into a non-
denominational school
11 a proposal to discontinue a further education centre which is
managed by the Education Authority
A proposal may fall under more than one paragraph of the above list.
Relevant Consultees
Consultation generally requires to take place with the persons involved
in a school that is affected by a proposal. A school is affected by a
proposal if the proposal directly concerns that school. Any other school
which would be significantly affected in consequence of the proposal, if
implemented, is also a school affected by the proposal.
The persons to be consulted, in respect of each relevant proposal,
are specified in Schedule 2 to the Act. There are certain “consultees”
common to every proposal relating to a school. These are:
• The Parent Council or Combined Parent Council of any affected
school
• The parents of the pupils at any affected school
• The parents of any children expected by the Education Authority to
attend any affected school within two years of the date of publication
of the proposal paper
• The pupils at any affected school (insofar as the Education Authority
considers them to be of a suitable age an maturity)
• The staff (teaching and other) at any affected school
• Any trade union which appears to the Education Authority to be
representative of the staff, including teaching and other staff
• Any other education authority that the Education Authority advancing
the proposal considers relevant
However, once the exact proposal to be progressed is formulated, a
more precise list of the relevant consultees can be framed.
If the proposal affects the provision of Gaelic medium education, then
Bòrd na Gàidhlig is an additional consultee.
Further Reading
The full provisions of the 2010 Act can be found at the following link:
Schools (Consultation) (Scotland) Act 2010 (legislation.gov.uk)
The Statutory Guidance for the 2010 Act (made under Section 19 of the
Act) can be found at the following link:
Schools (Consultation) (Scotland) Act 2010: guidance - gov.scot (www.
gov.scot)
Statutory Consultation