Page 1

1 
Finance & Policy Committee 
Date of Meeting: 18 August 2026 
Title of Report: Budget Monitoring – 3 months to 30 June 2026 
Presented by: James Gow, Head of Finance 
The Finance and Policy Committee is recommended to:
• Note the HSCP is reporting a small year to date overspend of £0.7m. 
• Note that the forecast is currently in line with budget apart from a large
forecast £10.2m overspend on the SLA with Greater Glasgow and Clyde.
• Note the HSCP is not currently progressing actions to mitigate the SLA
overspending but is working in partnership within emerging sub-national
frameworks.
• Note financial restrictions remain in place as spend is being financed by use
of reserves and the HSCP is not operating on a sustainable basis.
• Note savings of £2.8m have been delivered, 39% of target.
• Note the financial risks associated with the SLA and service provider failure
within the care at home service. 
1. EXECUTIVE SUMMARY 
1.1 
1.2
This report provides a summary of financial performance for quarter 1 of
2026/27. It provides the year to date position and year end forecast. At this
early stage there is significant uncertainty which makes projecting future costs
difficult. Spend is broadly in line budget and good progress has been made in
delivering savings. The main issue is the projected overspend on the SLA with
NHS Greater Glasgow and Clyde (GG&C). This has been known about for
some time but the approach to managing the financial implications has not yet
been settled. A detailed report is due to be provided to the IJB in September
and the HSCP continues to work with GG&C, Scottish Government and NHS
Highland. A sub-national / regional approach to this is required rather than an
entirely local one. 
The other main concern is provider failure within the care at home service
which is resulting in increased spend on agency and requires the HSCP to
consider the expansion of in-house services to manage service risk. It is
difficult to predict the financial implications at present and an options appraisal
model is being developed.. 
1.2  The HSCP is not operating on a financially sustainable basis and therefore
existing spend controls remain in place. There is still evidence that the actions

Page 2

2 
to improve financial performance are continuing to have an impact on service
delivery, unmet need and delayed discharges. 
2.  Recommendations 
• Note the HSCP is reporting a small year to date overspend of £0.7m. 
• Note that the forecast is currently in line with budget apart from a large
forecast £10.2m overspend on the SLA with Greater Glasgow and
Clyde.
• Note the HSCP is not currently progressing actions to mitigate the SLA
overspending but is working in partnership within emerging sub-
national frameworks.
• Note financial restrictions remain in place as spend is being financed by
use of reserves and the HSCP is not operating on a sustainable basis.
• Note savings of £2.8m have been delivered, 39% of target.
• Note the financial risks associated with the SLA and service provider
failure within the care at home service. 
3. DETAIL OF REPORT 
3.1  3 Months to 30 June 2026 
The table below provides the year to date figures for the first quarter. Social
Work/Care services report on a cash basis, Health report on an accrual basis. 
Appendix 1 provides further analysis: 
Service Actual
£000
Budget
£000
Variance
£000
%
Variance
COUNCIL SERVICES TOTAL  20,385 19,948 (437) (2.2%)
HEALTH SERVICES TOTAL 74,104 73,855 (249) (0.3%)          
GRAND TOTAL 94,489 93,803 (686) (0.7%) 
3.2 
3.2.1 
Overall, financial performance is largely in line with budget. 
Forecast Outturn 
The main focus of budget monitoring is in respect of the forecast. At this stage
there are risks and uncertainties that make forecasting difficult. The table below
provides a summary with the estimated overspend on the SLA with Glasgow
shown separately. The HSCP does not consider that it is in a position to
manage this in the current year through spend reduction. This means that
additional funding and utilisation of reserves will be required to contribute to
the increased cost. The reported overspend is included in the NHSH financial
performance reporting to Scottish Government. Aside from this, financial
performance is otherwise close to budget.

Page 3

3 
Service Annual
Budget
£000
Forecast
Outturn
£000
Variance
£000
%
Variance
COUNCIL SERVICES TOTAL 108,103 108,336 (233) (0.2%)
HEALTH SERVICES  225,197 224,864 333 0.3%
GLASGOW SLA       89,105      99,264  (10,159)          (11.4%)
NHS Services Total    
NHS Services Total 314,302 324,128 (9,826) (3.0%)     
HSCP Total 422,405 432,464 (10,059) (2.3%) 
3.2.2  Within Social Work / Social Care the areas of concern and risk are: 
Children’s and Families – Forecast overspend £0.3m 
The Children and Families budget is forecasting an overspend as external child
placements are above budget despite the extra resource allocated here. This
will continue to be monitored in detail throughout the year. There may be some
opportunity to re-allocate budget within the service as the year progresses, the
total forecast overspend on this heading is £656k, savings relating to other
budgets are partially offsetting this. 
Older Adult Services – Forecast Overspend £0.1m 
Older Adult Services are currently forecast close to budget, the main concern
relates to the care at home service as 2 providers are in the process of handing
back services in areas where no other service providers are wiling / able to
step in. This is expected to increase agency costs and is pushing the HSCP
towards consideration of increased internal service provision in the Oban area.
Both of these approaches will put significant upward pressure on costs and
may result in reduced service provision across the area due to budgetary
constraints and shortage of staff. At present the service is managing service
hours on the same basis as last year, these are being held constant for now. 
Adult Services Budget  Forecast
Spend 
Variance
External Residential Placements – demand led
@ national contract rate
£14.2m £14.3m (£0.1m)
Care @ Home Service £21.1m £21.1m    -
Internal Care Home Placements £8.9m £  8.9m    -
Older Adults - Other £10.7m £ 10.7m    -
Total £54.9m £55.0m   (£0.1m)     
Services to People with lifelong Conditions – Forecast Overspend £0.2m 
These budgets total £31m and a small overspend is forecast. 
Key risks: 
• Costs of delivering care at home services increasing as a result of
provider failure. Excess costs arise from agency, accommodation for
agency and the potential for the expansion of in-house services which

Page 4

4 
will increase on-costs and will require spend on management and
vehicles over and above current budgets.
• Continuing high levels of service demand in older adult services,
particularly in winter and pressure to manage delayed discharges. 
• On-going costs of external placements and numbers of clients requiring
these.
• Delivery of the remaining savings programme. 
To some extent, these risks can be mitigated by the general reserve prudently
built up in recent years. The Social Work budget relies upon £1m of non-
recurring funding from Council.   
3.2.3  NHS services are forecasting a significant overspend due to the increased cost
associated with the SLA with Greater Glasgow and Clyde. This single issue is
driving the adverse financial performance within the NHS and therefore is
presented separately. Excluding the SLA, the NHS budget is otherwise
forecasting a very small underspend. There are other concerns, these are: 
• Agency spend on medical staff at Lorn and Isles Hospital.
• The costs of locum / agency staffing within 2C GP practices.
• Costs associated with out of area Mental Health placements. 
• Shortfalls in the delivery of the savings programme. 
The NHS budget is so far reliant upon £6.5m of reserves to support services. 
As has been highlighted for some time, the main strategic finance issue facing
the IJB relates to the NHS financial position and the SLA with Greater Glasgow
and Clyde. The current position is that Glasgow intend to invoice for 75% of
what they say is the full cost increase of services provided by them to Argyll &
Bute residents. The resultant forecast overspend currently sits at £10.2m. It is
intended that a detailed report providing an analysis of the activity and financial
data will be provided to the September 2026 meeting of the IJB. Whilst the
financial implications are provisional at this stage, it is certain that the SLA
charge will be well above budget and therefore the IJB will be spending
substantially more on services for residents than it is funded for (through the
NRAC funding model). NHS Highland are aware of the projection as are
Scottish Government. There is no agreed approach at present. Additional
funding, reduce utilisation of services in Glasgow and / or a significant
reduction in activity will be required for the Argyll & Bute health system to move
towards financial balance. A sub-national planning approach is developing.
Locally there may be opportunities to consider: 
• What clinical activity could take place locally within existing resources
instead of in GG&C.
• Can delayed discharges be managed better locally through discharge
to assess models and better use of our community hospitals.
• Are there charges and services within the SLA model which can be
negotiated down or sourced elsewhere. 
These issues will be considered in the September report. Ultimately the
expectation is that costs will be greater than the HSCP is currently resourced
for and additional funding and / or additional savings will be required.

Page 5

5 
In the short term the re-purposing of reserves is likely to be the only realistic
local contribution. Structural change is likely to take some years and the IJB
will be contributing to system overspending in the meantime.    
3.2.4  Due to the unsustainable financial position and outstanding savings which are
still to be delivered, processes to manage spend continue: 
• Vacancy management.
• Increased controls and reporting of agency and locum spend.
• New approval process for agency staffing. 
• Care at Home is being managed within budgeted hours as part of the
Threshold of Care implementation. 
Additionally Scottish Government have placed restrictions on the ability of NHS
Boards to appoint senior staff without central approval. 
These measures may result in some reduction in service and increase in unmet
need or increased waiting times for care packages. Reserves are being held
to contribute to managing overspending and / or slippage with the savings
programme. 
3.3 Savings Delivery 
3.3.1 
3.3.2 
3.3.3 
The savings programme totals £7.2m, this includes a 3% savings target
(£2.2m) attached to the SLA with NHS GG&C. This saving is based on the
national savings target set by Scottish Government, it is assumed that the
intention was not to disproportionately target rural services and therefore this
has been applied to the SLA. It is forming part of the discussions with GG&C
and Scottish Government but is also considered a red risk. To date £2.8m or
39% of the savings target has been declared, the proportion achieved is higher
at 69% for social work / social care services. 
2026/27 Savings     
Target Achievement Balance %  
£' 000 £' 000 £' 000  
Fully achieved 2,652 2,652 0  
Remaining programme 4,544 174 4,370  
Total 7,196 2,826 4,370 39% 
Appendix 3a lists the fully delivered savings and 3b summarises the remaining
savings, risk rated: 
Savings regarded as low risk £141 
Savings that may not be achieved in full in 2026/27 £1,393k 
Savings unlikely to be deliverable in 2026/27 £2,836k 
There are a number of savings which are going to take some time and require
organisational change processes, several of these are relatively high risk at
present. Progress continues to be monitored weekly through the savings
review group meetings. The Threshold of Care saving has been achieved and
is fully declared, however, the impact of the policy change will continue to be
monitored for some time to come as there remains a number of home care
clients who receive care above the threshold.

Page 6

6 
3.4 
3.4.1 
3.4.2 
3.5 
4
4.1 
5
5.1   
6
6.1 
Reserves 
Reserves of £31.1m were carried into 2026/27, mostly to fund future NHS
service costs. To date £6.5m has been allocated leaving a balance of £24.8m.
General reserves are £2.3m which is around 0.5% of annual spend and are
well below the 2% aspirational target set out in the reserves policy. The HSCP
is not progressing substantial new projects at present.   
Reserve funding for sustainability and value and agenda for change costs total
£15.5m of the earmarked reserves balance. The GG&C SLA issue may require
to be resolved through re-purposing of these resources.   
National Context 
The position across the IJB sector remains of concern, work is on-going
nationally to update the national picture and Audit Scotland are currently
undertaking an additional piece of work to provide advice to Government on
the sustainability of IJBs, as well as on cost drivers within the social care sector.
It is expected that the budget setting process for 2027/28 will be very
challenging across the sector with further reductions in services likely to be
proposed. 
Scottish Government are placing restrictions on NHS recruitment of senior staff
as a consequence of the development of sub-national planning and public
sector reform. However, they have not communicated the detail of the
structural reform being considered. There are additional workstreams being
established to take forward this agenda which risks diverting management time
to structural change at a point in time when local service risks are very high. 
Despite this context, the HSCP is required to focus on the development of the
implementation plan relating to its new JSP. This is still aligned to the strategic
direction outlined by Government in respect of service design and delivery. 
RELEVANT DATA AND INDICATORS 
Information is derived from the financial and care management systems
of both partners. 
CONTRIBUTION TO STRATEGIC PRIORITIES 
The Integration Joint Board has a responsibility to balance its budget and
ensure spend and investment is aligned to the Strategic Plan. 
GOVERNANCE IMPLICATIONS 
Financial Impact – there a strategic concern in respect of the escalating
cost of the SLA with Glasgow. This is a critical element of health and social
care services. The activity and financial aspects of this will be reported in
September. There is no agreed approach to managing the overspending
at present, which sits with NHS Highland. Other than this, the HSCP is
operating close to budget at this early stage in the year.

Page 7

7 
6.2 
6.3
Staff Governance – None but there is a strong link between HR
management and delivering a balanced financial position and delivering
on the savings plan. 
Clinical Governance – None directly, cost savings are impacting upon
care volumes and/or quality. 
7. 
7.1 
7.2 
8.
PROFESSIONAL ADVISORY 
Professional Leads have been consulted on the implications of the budget and
savings programme. 
Professional advice is that the HSCP should aim to increase the provision of
reablement and proactive Care at Home reviews. This is now being done. We
are also required to develop or refocus services towards prevention. This is
more challenging to achieve given current service pressures though is under
active discussion within the management team. Efficiency improvement
measures taken to manage the financial situation are leading to care at home
not being provided to community and hospital in-patients to the same extent,
or as quickly as in the past. This is leading to increased dependency and
deconditioning from longer stays in hospital and blocks to discharge causing
associated system flow pressures. Increased risk held in community and
increased demand on unpaid carers are other consequences. Any further
action to reduce social care activity levels / costs will exacerbate these issues. 
EQUALITY AND DIVERSITY IMPLICATIONS 
8.1 None directly. 
9. 
9.1 
10.
GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
None. 
RISK ASSESSMENT 
10.1 Financial risks remain very high. The main concerns are: 
• SLA with Glasgow
• Costs of delivering care at home services as providers hand back
services. 
• Delivery of remaining savings. 
Although progress has been made, the HSCP is still not operating in a
financially sustainable way, spend and service demand is exceeding
resourcing. NHS services are operating well above budget and there is a very
substantial budget gap facing the HSCP in 2027/28 and beyond. The current 
risk to NHS Highland relates mainly to the SLA and this cannot be managed
by the HSCP through reduced spend due to the scale and the population
health implications associated with addressing it through service reduction.
The risk to Argyll & Bute Council is mitigated through the general reserves. 
There are risks associated with public sector reform which is under
consideration but has not been communicated in any detail.

Page 8

8 
11. PUBLIC AND USER INVOLVEMENT AND ENGAGEMENT 
11.1  None directly, engagement relating to the budget was extensive in 2025/26.
The HSCP is transparent in respect of its finances and expects to conduct a
budget engagement for the 2027/28 year towards the end of 2026. 
12. CONCLUSIONS 
12.1 
12.2 
This report provides a summary of the financial position as at the end of quarter
one. It is early in the year and therefore there are risks in respect of the financial
forecasts. However, the HSCP is operating close to budget at present with the
main concern being the increased SLA cost with Glasgow. Due diligence and
analytical work is underway and will be reported to the IJB in September. The
financial risk associated with this largely sits with NHS Highland.   
The HSCP is maintaining its approach to expenditure control and savings
delivery as it does not consider that it is operating on a financially sustainable
basis (SLA issue aside).  Attention is now shifting towards budget proposals
for the 2027/28 year and longer term planning. Resolving the SLA is a priority
in this context. At present the HSCP is not working on service reductions and
re-design that would remove this level of cost form local services. 
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required √
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland
Health Board 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
SLT Budget monitoring M3 21/07/2026 Noted 
APPENDICES:
Appendix 1 – Year to Date Position 
Appendix 2 – Forecast Outturn 
Appendix 3a and 3b – Savings Programme
Appendix 4 – Reserves   
AUTHOR NAME: James Gow, Head of Finance 