Democracy Spraffa

Neurodiverse Pathways - Governance Update

Argyll and Bute Council · 12 May 2026
Back to Argyll and Bute HSCP Clinical and Care Governance Committee — 12 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
Meeting:   Clinical & Care Governance Committee 
Date of Meeting:  12 May 2026 
Title of Report:  Neurodiverse Pathways – Governance Update 
Presented by:  Nicola Gillespie, Head of Complex Care and Registered 
Services    
The  CCG committee is asked to:
▪ Note the current update and progress in relation to ASD and ADHD
pathways.
▪ Note the identified clinical, operational and governance risks.
▪ Note the interim mitigation actions in place to protect patient safety and
service sustainability. 
EXECUTIVE SUMMARY
Demand for neurodevelopmental assessment and support across Argyll & Bute
continues to increase at a level that exceeds current service capacity. This has
resulted in growing waiting lists, pressure on secondary care services, and
identified governance risks, particularly in relation to ADHD prescribing and
monitoring arrangements. 
Immediate interim actions have been taken to stabilise risk, including the decision
to move to a Tier 4 only ADHD service, prioritising those with complex needs,
comorbid mental illness and risk. A Short Life Working Group (SLWG) has been
re‑established to provide coordinated oversight and support longer‑term pathway
redesign. While these measures mitigate immediate risks, they do not address
underlying system capacity constraints, which require ongoing strategic
consideration. 
1. RECOMMENDATIONS
▪ Note the current update and progress in relation to ASD and ADHD
pathways.
▪ Note the identified clinical, operational and governance risks.
▪ Note the interim mitigation actions in place to protect patient safety and
service sustainability.

Page 2

2 
2. DETAIL OF REPORT
Autistic Spectrum Disorder Pathway
The ASD diagnostic service remains significantly constrained, with limited
staffing and a waiting list in excess of 200 adults. Despite short‑term
mitigation through commissioned external assessments, referral volumes
continue to exceed available capacity. The service remains diagnostic only,
with no commissioned post‑diagnostic support pathway, limiting the
system’s ability to respond holistically to need.
Referral quality and consistency continue to impact efficiency, and work is
underway through the SLWG to review referral tools and processes, drawing
on learning from other Health Boards. 
ADHD Pathway
There is currently no dedicated, tiered ADHD service within Argyll & Bute.
As a result, referrals have defaulted into secondary mental health services,
creating significant pressure on Community Mental Health Teams (CMHTs)
and consultant psychiatrist capacity. Adult ADHD waiting lists now exceed
230 individuals, with particularly high demand in Oban, Lorn and the Isles.
A material clinical governance risk has emerged following notification from
Lorne Medical Centre of its intention to cease prescribing ADHD medication
in the absence of agreed shared care or enhanced service arrangements.
This affects a significant cohort of existing patients and highlights broader
system challenges around monitoring requirements, private diagnoses, and
prescribing responsibility.
In response, an interim decision has been taken to move to Tier 4 only
acceptance criteria for ADHD referrals, aligning Argyll & Bute with practice in
other areas and prioritising individuals where CMHT‑level intervention is
clinically appropriate. 
Next Steps for ASD and ADHD Pathways
1. Move to a tier 4 ADHD service provision and ensure robust communication
to GP colleagues and clients
2. Continue to work with our Primary Care colleagues to mitigate risk.
3. Continue to scope ASD service and develop options for in house vs
commissioned service
4. Scope gaps and needs for future service 
3. RELEVANT DATA AND INDICATORS, - 
Almost 500 adults are awaiting ASD or ADHD assessments. A review of
referrals is underway to ensure appropriate service allocation and reduction
of unnecessary demand. 
4. CONTRIBUTION TO STRATEGIC PRIORITIES,
The strategy aligns with agreed HSCP priorities and supports national policy
implementation.

Page 3

3 
Strategic Gaps:
• No national funding for post-diagnostic support services.
• Previous strategy development excluded key stakeholders and LD
services. 
5. GOVERNANCE IMPLICATIONS
Financial Impact:
• Current funding models do not support existing demand or sustainable
pathway delivery.
• Interim arrangements are being managed within existing resource but
are not viable long term.
• Future pathway options will require explicit consideration of affordability
and funding gaps.
Staff Governance:
• The diagnostic practitioner is managed by the Senior Manager for LD
with external mentoring support.
Clinical and Care Governance:
• Risk of harm associated with delayed diagnosis and interruption to
ADHD prescribing and monitoring.
• Pressure on CMHT capacity, with diversion of consultant time from
people with severe and enduring mental illness.
• Increased inequity of access due to geographic variation and reliance
on private diagnosis routes.
6. PROFESSIONAL ADVISORY
All professional standards and advisory requirements are being met. 
7. EQUALITY & DIVERSITY IMPLICATIONS
The strategy respects and promotes all protected characteristics and diversity
principles, however if the service moves to a tier 3 or 4 only, this may impact
those wishing to access services.      
8. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE
Fully compliant. 
9. RISK ASSESSMENT
Clinical risk associated with delayed or disconnected care.
Reputational and legal risk arising from unmet need and variation in service
access.
These risks are currently mitigated through interim service controls,
enhanced senior oversight, and SLWG governance. 
10. PUBLIC & USER INVOLVEMENT & ENGAGEMENT

Page 4

4 
Clear communication with patients and Primary Care is being prepared and
will be prioritised to manage expectations and reduce uncertainty.
11. CONCLUSIONS
Significant pressures remain across neurodiverse pathways, driven by rising
demand and limited capacity. Interim governance actions have been
necessary to protect patient safety and clinical sustainability, however these
measures underline the need for longer‑term system redesign 
12. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required x
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
13. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
e.g. Finance
and Policy
Committee 
Budget outlook 01/01/24 e.g.
Recommended
to the IJB 
REPORT AUTHOR AND CONTACT 
Author Name:  Nicola Gillespie
Email:  nicola.gillespie2@nhs.scot