Annual Audit Report
Argyll and Bute Council – year ended 31 March 2025
January 2026

Page 2

Audit and Scrutiny Committee
Argyll and Bute Council Forvis Mazars
Lochgilphead The Corner, Bank Chambers
PA31 8RT 26 Mosley Street
Newcastle upon Tyne
16th January 2026 NE1 1DF
Dear Committee Members and Controller of Audit,
Annual Audit Report – Year ended 31 March
2025
We are pleased to present our Annual Audit Report for Argyll and Bute Council for the year ended 31 March 2025. The purpose of this report is to summarise our audit findings and
conclusions.
This report has been prepared in accordance with the responsibilities set out within the Audit Scotland’s Code of Audit Practice (“the Code”). This report is intended solely for the Audit and
Scrutiny Committee for the purpose of communicating certain matters that, in our professional judgement, are relevant to your oversight of the financial reporting process. Except where
required by law or regulation, it should not be used, quoted or made available to any other parties without our prior written consent.
We appreciate the courtesy and co-operation extended to us by Argyll and Bute Council throughout our audit. We would be happy to discuss the contents of this report, or any other
matters regarding our audit, with you in more detail.
Yours faithfully
Mark Outterside (Director)
Forvis Mazars LLP – The Corner, Bank Chambers, 26 Mosley Street, Newcastle upon Tyne, NE1 1DF – Tel: 0191 383 6339 – www.forvismazars.com/uk
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is a limited liability partnership registered in England and
Wales with registered number OC308299 and with its registered office at 30 Old Bailey, London, EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered
Accountants in England and Wales. Details about our audit registration can be viewed at www.auditregister.org.uk under reference number C001139861. VAT number: GB 839 8356 73

Page 3

Contents
01 Executive summary
02 Status of our audit
03 Audit approach and risk summary
04 Significant findings
05 Summary of misstatements
06 Fraud considerations
07 Wider Scope
08 Best Value
Appendix A: Internal control conclusions
Appendix B: Draft management representation letter
Appendix C: Draft audit report
Appendix D: Confirmation of our independence
Appendix E: Other communications
Appendix F: Wider scope and Best Value ratings
Appendix G: Current year updates, forthcoming accounting & other issues
This document is to be regarded as confidential to Argyll and Bute Council. It has been prepared for the sole use of the Audit and Scrutiny Committee as the appropriate sub-committee
charged with governance. No responsibility is accepted to any other person in respect of the whole or part of its contents. Our written consent must first be obtained before this
document, or any part of it, is disclosed to a third party.
3

Page 4

01Executive Summary

Page 5

Executive summary
Scope
We have been engaged to audit the financial statements of Argyll and Bute Council for the
year ended 31 March 2025 which are prepared in accordance with the Code of Practice on
Local Authority Accounting in the United Kingdom 2024-25.
We have conducted our audit in accordance with International Standards on Auditing (UK)
(‘ISAs’), relevant ethical and professional standards, and the requirements set out in the
Audit Scotland’s Code of Audit Practice 2021. Our responsibilities and powers are derived
from our appointment by the Accounts Commission under the Part VII of the Local
Government (Scotland) Act 1973.
Audit status
Our audit procedures are now substantially complete for the year ended 31 March 2025.
At the time of preparing this report, there are no significant matters outstanding.
Areas of focus and audit approach, and significant findings
We have not made any changes to our initial risk assessment and planned audit approach
that was communicated to the Audit and Scrutiny Committee in our Annual Audit Plan.
Our significant risks and other areas of focus are set out in the ‘Audit approach and risk
summary’ section, with a summary of our audit approach over those areas. Significant
findings from our audit are set out in the ‘Significant findings’ section.
Significant control deficiencies
We did not identify any significant deficiencies in internal control.
The non-significant control observations that we have identified to date are set out in
‘Appendix A: Internal control conclusions’.
Audit misstatements
A summary of the adjusted and unadjusted misstatements above our reporting threshold
we have identified to date is set out in the ‘Summary of misstatements’ section.
5

Page 6

Executive summary (continued)
Audit opinion
At the time of issuing this report and subject to the satisfactory conclusion of our remaining
audit work, we anticipate issuing an unqualified opinion, without modification, as set out in
Appendix C.
Wider scope
We anticipate having no significant wider scope risks to report in relation to the financial
management; financial sustainability; vision, leadership and governance; and use of
resources to improve outcomes arrangements that the Council has in place. Further details
have been provided in section ‘Wider scope and Best Value’ of this report.
Best Value
We anticipate having no significant risks in arrangements to report in relation to the
arrangements that the Council has in place to secure economy, efficiency and
effectiveness in its use of resources. We have raised some recommendations relating to
our work on the Thematic Review and Effectiveness of Performance Reporting. Further
details have been provided in section ‘Wider scope and Best Value’ of this report. We have
also produced a separate report for the Thematic Review, which covers the theme of
Transformation.
Management Commentary and Annual Governance Statement opinion
We anticipate that we will have no matters to report in respect of the Management
Commentary or the Annual Governance Statement preparation as it is consistent with the
financial statements and has been prepared in accordance with statutory guidance issued
under the Local Government in Scotland Act 2003 and Delivering Good Governance in
Local Government Framework 2016. Our proposed Management Commentary and
Annual Governance Statement opinion is included in the draft auditor’s report in Appendix
C.
Matters on which we report by exception
We are required by the Accounts Commission for Scotland to report to you if, during the
course of our audit, we have found that adequate accounting records have not been kept;
the financial statements and the audited part of the Remuneration Report are not in
agreement with the accounting records; or we have not received all the information and
explanations we require for our audit. We have nothing to report in respect of these
matters.
Other information
We are required to report on whether the other information (comprising of the
Management Commentary, Annual Governance Statement, Statement of Responsibilities
and the unaudited parts of the Remuneration and Staff Report), is materially inconsistent
with the financial statements; is materially inconsistent with our knowledge obtained in the
course of the audit; or is materially misstated. No inconsistencies have been identified,
and we have issued an unmodified opinion in this respect.
6

Page 7

Executive summary (continued)
Wider reporting powers
Section 101 of the Local Government (Scotland) Act 1973 requires us to give any person
interested, the opportunity to question us about the accounting records of the Council and
to consider any objection made to the accounts. No such correspondence from electors
has been received.
Reporting to the group auditor
We anticipate reporting that the WGA submission is consistent with the audited financial
statements.
7

Page 8

Executive summary (continued)
Qualitative aspects of Council’s accounting practices
We have reviewed Council’s accounting policies and disclosures and conclude that they comply with the Code of Practice on Local Authority Accounting in the United Kingdom 2024-25,
appropriately tailored to the Council‘s circumstances.
The first set of draft accounts did not include appropriate disclosures for IFRS 16 (in relation to leases and Public Private Partnership arrangements), as there were delays from MUFG,
who the Council engaged as a specialist to provide technical support for their lease transition work. This was disclosed in the management commentary in the first set of accounts, and
appropriate disclosures were subsequently added to the accounting policies in their updated accounts once MUFG had completed their transition work for the Council.
While the draft accounts received on 27 June 2025 did not reflect IFRS 16, a revised version was submitted on 12 November 2025, and each set was prepared to a good quality.
Significant matters discussed with management
During our audit, we communicated the following significant matters to management:
• IFRS 16 transition: As noted above, the Council’s first set of draft accounts did not contain updated disclosures for Leases and Public Private Partnership arrangements under IFRS
16, due to delays from the Council’s specialist technical advisor, MUFG, who assisted with the Council’s transition work and disclosures. This led to a delay in receiving updated
accounts (inclusive of the disclosures under IFRS 16), which were not received until November 2025. The updated lease disclosures were of a good quality. We tested leases and PPP
arrangements at enhanced risk this year – please see page 22 for more detail.
• New payroll system: The Council transitioned from their old payroll system (ResourceLink) to a new system (iTrent) in August 2024. We engaged our internal IT specialist team to
undertake additional work around the governance of the data migration of this. One internal control recommendation was identified – please see page 88. We also tested payroll at
enhanced risk – please see page 23 for more detail.
• Prior period restatements: The Council processed one material prior period adjustment relating to the presentation of Cash and Cash Equivalents. Live Argyll bank balances are
transacted through and held within the Council’s own bank accounts and were previously presented as a debtor rather than being included within Cash and Cash Equivalents. These
balances were reclassified from Debtors to Cash and Cash Equivalents in the 2023/24 comparative figures with a corresponding creditor recognised to reflect the liability to Live Argyll.
There were also non-material prior period adjustments relating to the presentation of Cash and Cash Equivalents, and gross interest paid and received. None of these restatements
have had any impact on the surplus/deficit, net assets or reserves position.
8

Page 9

Executive summary (continued)
Significant difficulties during the audit
We have not encountered any significant difficulties and we have had the full co-operation of management.
Other matters of significance
We encountered no significant difficulties during our audit and had no significant disagreements with management. There was effective co-operation and communication between Forvis
Mazars, management, and the Audit and Scrutiny Committee during our audit. All requested information and explanations were provided to us.
Other matters we are required by ISA (UK) 260 Communication with Those Charged with Governance to communicate to you have been set out in Appendix E.
9

Page 10

02Status of our audit

Page 11

Status of our audit
Our audit work is substantially complete and there are currently no matters of which we are aware that would require modification of our audit opinion, subject to the satisfactory
resolution of the outstanding matters set out below.
Audit quality control and completion procedures Status Our audit work is subject to ongoing manager and director review and quality control procedures. In addition,
we need to update post balance sheet event considerations. We will complete our final review of the accounts Medium
upon receipt of the signed version and letter of representation.
Status
High - Likely to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Medium - Potential to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Low - Not considered likely to result in a
material adjustment or a change to
disclosures in the financial statements.
N/A - Work on Wider Scope and Best Value
arrangements therefore no risk of
adjustment to the financial statements.
11

Page 12

03Audit approach and risk summary

Page 13

Audit approach and risk summary
Changes to our audit approach
There have been no changes to the audit approach we communicated in our Annual Audit
Plan, issued in June 2025.
Materiality
Our provisional materiality for the Council at the planning stage of our audit was set at
£9,697k using a benchmark of 2% of gross operating expenditure as per the Annual Audit
Plan (provisional performance materiality: £7,273k; and provisional clearly trivial
threshold: £291k).
Our provisional materiality for the Group at the planning stage of our audit was set at
£9,810k using a benchmark of 2% of gross operating expenditure as per the Annual Audit
Plan (provisional performance materiality: £7,358k; and provisional clearly trivial
threshold: £294k).
Based on the final financial statement figures, the final overall materiality we applied for
the Council was £10,442k (final performance materiality: £7,832k; final clearly trivial
threshold: £313k). The final overall materiality we applied for the Group was £10,584k
(final performance materiality: £7,938k; final clearly trivial threshold: £317k).
Group audit approach
We have made some minor changes to our Group audit approach, please see page 16 for
more detail.
Charitable Trusts
Based on the final financial statement figures, the final overall materiality applied for the
Charitable Trusts was £16k (final performance materiality: £10k; final clearly trivial
threshold : £0.5k).
We have provided our consideration of our independence as part of the Council
engagement and Charitable Trust engagement in Appendix D.
13

Page 14

Audit approach and risk summary (continued)
Significant risks
Fraud risk
Judgement
Error
Substantive audit
procedures
Tests of controls
Misstatement
identified
Control
recommendations
Conclusion
Page ref to finding   
Management override of controls Yes Yes No Yes No No No Risk satisfactorily addressed. 18
Valuation of the net defined benefit
(liability)/surplus No Yes Yes Yes No Yes No Risk is satisfactorily addressed but we identified some minor
disclosure misstatements on the pension notes. 30
Valuation of property, plant and equipment No Yes Yes Yes No No Yes Risk satisfactorily addressed, but we identified some internal
control recommendations.
88
and
91
14

Page 15

Audit approach and risk summary (continued)
Other key areas of judgement, and enhanced
risks
Fraud risk
Judgement
Error
Substantive audit
procedures
Tests of controls
Misstatement
identified 
Control
recommendations
Conclusion
Risk satisfactorily addressed, although there were several
adjustments to the financial statements (as a result of MUFG – Lease liabilities including PPP (Public Private Ye 28-No Yes Yes Yes No Yes the Council’s technical advisor – providing their IFRS 16 data Partnership) contracts s after the date that the draft accounts were published).
Accuracy and completeness of staff costs Ye Risk satisfactorily addressed, although we noted an internal following change in payroll/HR system No Yes Yes Yes No No s control recommendation.
Page ref to finding
29
87
15

Page 16

Audit approach and risk summary (continued)
Overview of our group audit approach
You engaged us to audit the group financial statements of Argyll and Bute Council and Group. Based on our risk assessment and the financial information for the year ending 31 March
2025, we determined that certain components consolidated into the group financial statements should be subject to either a full scope audit or a specific scope audit, as set out in the table
below.
Component name % Group
Expenditure Location Auditor Scope Changes to scope
since planning?       
Argyll and Bute
Council 98% Kilmory, Lochgilphead,
Argyll, PA31 8RT
Forvis
Mazars Parent - a full audit of the financial information. No
Argyll and Bute
Integration Joint
Board
0% Campbeltown, PA28 6LE Forvis
Mazars
A full audit of the financial information. We initially intended to perform
specific procedures on the Integration Joint Board’s accounts, but we
have completed the full audit alongside the Council audit.
Yes
Dunbartonshire and
Argyll and Bute
Valuation Joint Board
0.3%
Kilbrannan House,
Bolgam St,
Campbeltown, PA28 6JY
Forvis
Mazars
Audit of specific balance – the Pension asset/liability. We did not intend to
perform any procedures on these accounts but noted on review of the
draft accounts that there are material gross figures for Pensions included
as part of the Valuation Joint Board’s accounts.
Yes
Campbeltown
Live Argyll 1.6% Aqualibrium. Kinloch
Road, Campbeltown,
Forvis
Mazars
Audit of specific balance – the Pension asset/liability. We obtained a
specific IAS 19 report for this work. No
Argyll, PA28 6EG
Common Good
accounts
0.1% Kilmory, Lochgilphead,
Argyll, PA31 8RT
Forvis
Mazars
N/A – this has not been scoped into our group work on the grounds of
materiality. No
Audit scope definitions
Full scope audit: an audit of the component’s financial information prepared for group reporting purposes using component performance materiality.
Audit of account balance(s), class(es) of transaction, and/ or disclosures(s): an audit of specific account balance(s), class(es) of transaction, and/ or disclosure(s) included in the
component’s financial information prepared for group reporting purposes, using component performance materiality.
Group engagement team instructed engagement procedures: specific audit procedures performed over the component’s financial information, as instructed by the group engagement
team, using component performance materiality.
16

Page 17

04Significant findings

Page 18

]
blank
blank
Significant findings
The significant findings from our audit include our conclusions regarding the significant risks we identified and other key areas of judgement, which are set out in this section.
Significant risks
Management override of Description of the risk
controls Management at various levels within an organisation are in a unique position to perpetrate fraud because of their ability to manipulate accounting
records and prepare fraudulent financial statements by overriding controls that otherwise appear to be operating effectively. Due to the unpredictable
way in which such override could occur there is a risk of material misstatement due to fraud on all audits. You should assess this risk as part of your
oversight of the financial reporting process.
How we addressed this risk
We addressed this risk through performing audit work over:
• accounting estimates impacting amounts included in the financial statements;
• consideration of identified significant transactions outside the normal course of business; and
• journal entries recorded in the general ledger and other adjustments made in preparation of the financial statements.
Audit conclusion
There are no significant issues to report regarding management override of controls.
18

Page 19

blank
blank
Significant findings
The significant findings from our audit include our conclusions regarding the significant risks we identified and other key areas of judgement, which are set out in this section.
Significant risks
Valuation of the net defined Description of the risk
benefit (liability)/surplus As at 31 March 2025, the net defined benefit liability was £16.984m. The valuation of the Council’s net liabilities/assets includes use of discount
rates, inflation rates, mortality rates etc., all of which should reflect the profile of the Council’s employees and other appropriate data. Due to the high
degree of estimation uncertainty associated with the valuations, we have determined there is a significant risk in this area. The valuation of the
Council’s net liabilities/assets includes use of discount rates, inflation rates, mortality rates etc., all of which should reflect the profile of the Council’s
employees and other appropriate data. Due to the high degree of estimation uncertainty associated with the valuations, we have determined there is
a significant risk in this area.
How we addressed this risk
We addressed this risk through:
• challenging the reasonableness of the Actuary’s assumptions that underpin the relevant entries made in the financial statements;
• critically assessing the competency, objectivity and independence of the Actuary;
• liaising with the auditors of the Pension Fund to gain assurance that the overall IAS19 procedures and controls in place at the Pension Fund are
operating effectively;
• compared assumptions to expected ranges; and
• agreed data in the Actuary’s valuation report for accounting purposes to the relevant accounting entries and disclosures in the Council’s financial
statements.
Audit conclusion
Other than some minor disclosure issues (which have been reported per Section 05 of this report), there are no significant issues to report regarding
the valuation of the net defined benefit (liability)/surplus.
19

Page 20

]
blank
Significant findings
The significant findings from our audit include our conclusions regarding the significant risks we identified and other key areas of judgement, which are set out in this section.
Significant risks
Valuation of property, plant Description of the risk
and equipment The Council held land and buildings (including council dwellings) with a net book value of £455.9m at 31 March 2025. The Council has adopted a
rolling revaluation model which involves other land and buildings being revalued over a five-year cycle. This may result in individual assets not being
revalued for several years. This creates a risk that the carrying value of those assets that have not been revalued in year is materially different from
the year end fair value. Valuations are based on specialist and management assumptions and changes in these can result in material changes to
valuations. Due to the high degree of estimation uncertainty associated with valuations, we have determined there is a significant risk in this area.
How we addressed this risk
We addressed this risk through:
• assessing the scope and terms of engagement with the in-house Valuer;
• assessing the competence, skills and objectivity of the in-house Valuer;
• assessing how management use the in-house Valuer’s report to value land and buildings included in the financial statements;
• testing the accuracy of the data used in valuations;
• challenging the Council and in-house Valuer’s assumptions and judgements applied in the valuations;
• reviewing the valuation methodology used, including the appropriateness of the valuation basis;
• considering the reasonableness of the valuation by comparing the valuation output with market intelligence;
• testing a sample of revaluations in the year, by agreeing the revaluations recorded in the Annual Accounts to the in-house valuer’s reports. As
part of this testing, we checked whether the movements have been accounted for in accordance with the Code;
20

Page 21

]
blank
blank
Significant findings
The significant findings from our audit include our conclusions regarding the significant risks we identified and other key areas of judgement, which are set out in this section.
Significant risks
Valuation of property, plant
and equipment (continued) How we addressed this risk (continued)
We addressed this risk through:
• challenging management’s assessment for those assets not subject to valuation in the year;
• for those valued on Existing Use Value on a market comparable basis, we will check market movements to assess the materiality of potential
movement for 2024/25; and
• for those valued on a Depreciated Replacement Cost basis, which would be impacted by changes in build costs during the year, we tested
management’s analysis of changes in the Build Costs Information Service (BCIS) index and assessed any decisions management made in this
regard.
Audit conclusion
Based on our audit work, we have obtained sufficient, appropriate assurance. There are two control recommendations that have carried through
from previous years – please see page 88 and 91.
21

Page 22

blank
blank
Significant findings
The significant findings from our audit include our conclusions regarding the significant risks we identified and other key areas of judgement, which are set out in this section.
Enhanced risks
Lease liabilities including PPP
(Public Private Partnership)
contracts
Description of the risk
Enhanced risk due to the implementation of a new accounting standard in 2024/25 (IFRS 16 Leases). The Council has the following PPP contracts:
• Schools Non-Profit Distributing Organisation (NPDO) Public Private Partnership; and
• Schools Hub Design, Build, Finance and Maintain Contract (DBFM) Public Private Partnership.
IFRS 16 changes the definition of a lease compared to IAS 17 and IFRIC 4. The Council will apply this definition to new leases only and will
grandfather its assessments made under the old standards of whether existing contracts contain a lease. The new standard also applies to the
Council’s PPP arrangements from 1 April 2024. On transition to IFRS 16 on 1 April 2024, the Council will apply the standard retrospectively without
restatement. Additional new disclosures will also be required. The Council has previously made disclosures in its financial statements; however, this
is a complex area, hence we have assessed it as an enhanced risk.
How we addressed this risk
We addressed this risk through:
• critically review the accuracy and completeness of the Council’s assessment and review the changes to the PPP models;
• review the accounting treatment;
• ensure the required disclosures have been made; and
• seek other evidence as appropriate.
Audit conclusion
Based on our audit work, we have obtained sufficient, appropriate assurance. We have included the IFRS 16 transition adjustments per the adjusted
misstatements schedule, as these had not been processed per the draft accounts. Note that the PPP CIES adjustments (per page 28) include the
correction of a historical error in the old PPP model, which has been processed this year to ensure the starting PPP balances were on the correct
opening basis. We also noted that the NPDO model was not operational in 2024/25, and the DBFM model (created by MUFG – the Council’s
technical advisors) was hard coded. Work was performed to reverse engineer these models to become formula driven.
22

Page 23

blank
blank
Significant findings
The significant findings from our audit include our conclusions regarding the significant risks we identified and other key areas of judgement, which are set out in this section.
Enhanced risks
Accuracy and completeness Description of the risk
of staff costs following
change in payroll/HR system The Council have changed their payroll/HR system in-year (during August 2024), from ResourceLink to iTrent. There is a risk relating to data
migration, as this involves a significant amount of payroll/HR data being migrated from one system to another, which increases risks in relation to
accuracy and completeness of this data.
How we addressed this risk
We addressed this risk through:
• reviewing the Council’s arrangements for ensuring the iTrent system is accurate and complete;
• reviewing key files to ensure that these reconciled and were accurately recorded in the financial statements;
• increasing our sample size of staff costs by testing at enhanced risk; and
• using an internal Forvis Mazars IT expert/specialist to review the governance behind the data migration.
Audit conclusion
Based on our audit work, we have obtained sufficient, appropriate assurance. We have noted one control recommendation from the data migration
governance – please see page 87.
23

Page 24

Significant findings (continued)
Wider responsibilities – statutory reporting
The 1973 Act allows any persons interested to inspect the accounts to be audited and the underlying accounting records of the Council. The act also allows any persons interested to
object to the accounts. No such objections have been raised.
We are required to notify the Controller of Audit when circumstances indicate that a statutory report may be required.
• Section 102(1) of the 1973 Act allows us to prepare a report to the Commission about the Council’s accounts; matters that have arisen during the audit that should be brought to the
attention of the public; or the performance of the Council in their duties relating to Best Value and community planning. No such reports have been prepared.
• Section 102(3) of the 1973 Act allows us to make a special report to the Commission if an item of account is contrary to law; there has been a failure on someone’s part to bring into
account a sum which ought to have been brought into account; a loss has been incurred or deficiency caused by the negligence or misconduct of a person, or by the failure of a body to
carry out a duty imposed on them by any enactment; or a sum which ought to have been credited or debited to one account of a body has been credited or debited to another account
and the body has not taken, or is not taking, steps to remedy the matter. No such reports have been prepared.
• Section 97A of the 1973 Act allows us to undertake or promote comparative and other studies to make and publish recommendations for the securing by local government bodies of
Best Value, improving economy, efficiency and effectiveness in the provision of services by local government bodies and improving the financial or other management of local
government bodies. No such recommendations have been prepared.
24

Page 25

05Summary of misstatements

Page 26

Summary of misstatements
Unadjusted misstatements
Our overall materiality, performance materiality, and clearly trivial (reporting) threshold were reported in our Annual Audit Plan, issued in June 2025. Any subsequent changes to those
figures are set out in the ‘Audit Approach and Risk Summary’ section of this report.
Management has assessed the misstatements in the table below as not being material, individually or in aggregate, to the financial statements and does not plan to adjust. We only report
to the Audit and Scrutiny Committee unadjusted misstatements that are either material by nature or which exceed our reporting threshold.
Details of adjustment Nature Assets Liabilities Reserves CIES
Blank Blank £’000 £’000 £’000 £’000
Dr: Short term Debtors
Cr: Fees, charges and other service income
Being the
extrapolated error
resulting from an
under accrual of
income.
556
-556
Plus – aggregated unadjusted misstatements brought forward from
2023/24 audit
Being the
unadjusted errors
identified in the
2023/24 audit that
impact upon
2024/25.
2,549 -1,200 0 -1,349
Aggregate effect of unadjusted misstatements blank 3,105 1,200 0 1,905  - -
We will obtain written representations confirming that, after considering the unadjusted misstatements, both individually and in aggregate, in the context of the financial statements taken
as a whole, no adjustments are required.
26

Page 27

Summary of misstatements (continued)
Adjusted misstatements
The misstatements in the table below have been adjusted by management. We report all individual misstatements above our reporting threshold that we identify during our audit
and which management had adjusted and any other misstatements we believe the Audit and Scrutiny Committee should be made aware of.
Details of adjustment Nature Assets Liabilities Reserves CIES
Blank Blank £’000 £’000 £’000 £’000
Dr: Gross Expenditure (Roads and
Infrastructure)
Cr: Gross Income (Roads and Infrastructure)
Being the adjustment to rectify the double
counting of internal transactions. 6,334
-6,334
Dr: Gross Income (various lines)
Cr: Gross Expenditure (various lines)
Being the adjustment to rectify errors
arising from internal transaction
adjustments.
419
-419 
s
27

Page 28

Summary of misstatements (continued)
Adjusted misstatements (continued)
The misstatements in the table below have been adjusted by management. We report all individual misstatements above our reporting threshold that we identify during our audit
and which management had adjusted and any other misstatements we believe the Audit and Scrutiny Committee should be made aware of.
Details of adjustment Nature Assets Liabilities Reserves CIES
£’000 £’000 £’000 £’000
-1,001
3,195
-2,194
3,679
-62
-4,621
1,004 
Blank
Dr: Interest payable and other charges
Cr: Gross expenditure (Education)
Cr: Reserves
Dr: Property, Plant and Equipment
Dr: Reserves
Cr: Other liabilities (Short term)
Cr: Other liabilities (Long term)
Blank
Being the adjustments made to the
Comprehensive Income and Expenditure
Statement following the implementation of
IFRS 16 in relation to Public Private
Partnership (PPP) schemes.
Being the adjustments made to the Balance
Sheet following the implementation of IFRS
16 in relation to Public Private Partnership
(PPP) schemes.
28

Page 29

Summary of misstatements (continued)
Adjusted misstatements (continued)
The misstatements in the table below have been adjusted by management. We report all individual misstatements above our reporting threshold that we identify during our audit
and which management had adjusted and any other misstatements we believe the Audit and Scrutiny Committee should be made aware of.
Details of adjustment Nature Assets Liabilities Reserves CIES
Blank Blank £’000 £’000 £’000 £’000
Dr: Interest payable and other charges
Dr: Reserves
Cr: Gross expenditure (various lines)
Cr: Gain on initial recognition of lease –
Capital contribution
Being the adjustments made to the
Comprehensive Income and Expenditure
Statement following the implementation of
IFRS 16 in relation to Leases.
215
290
-356
-149
Dr: Property, Plant and Equipment
Cr: Other liabilities (Short term)
Cr: Other liabilities (Long term)
Cr: Provisions (Long term)
Cr: Reserves
Being the adjustments made to the Balance
Sheet following the implementation of IFRS
16 in relation to Leases.
6,015
-1,946
-3,846
-7
-216
Aggregate effect of adjusted misstatements blank 9,694 10,482 2 786  -
29

Page 30

Summary of misstatements (continued)
Disclosure misstatements
We identified the following disclosure misstatements during our audit that have been corrected by management:
• There was no accounting policy included for IFRS 15 – Revenue from contracts with customers.
• There was no individual disaggregating note included within the accounts for Interest Payable, and Interest and Investment Income.
• Per Note 31 (Defined Benefit Pension Schemes), the ‘Change in Financial and Demographic Assumptions’ figure was presented as a net figure – it should be disaggregated into
separate assumption line figures.
• Per Note 31 (Defined Benefit Pension Schemes), the disclosure on the Virgin Media legal case was not up to date.
• Per Note 31 (Defined Benefit Pension Schemes), the figure for past service costs was disclosed as £0k – it should be £276k.
• Per Note 15 (Property, plant and equipment), the disclosures on the statutory override (in relation to infrastructure) did not contain enough detail.
• The presentation of the Cash Flow Statement had changed from the indirect method, to the direct method. Whilst this is permitted under the Code, the change in presentation needs to
be accompanied by a clear explanation.
• Per Note 14 (Related Parties), the figure for Bookfan Ltd Trading (per Note 14.2) was incorrectly disclosed as £71k – this should be £91k.
• Per Note 14 (Related Parties), a related party for one of the Councillors had not been included within the disclosure on Note 14.3.
• On the Group Balance Sheet, the ‘Investment in Associates and Joint Ventures’ figure is split out between long term/short term assets and liabilities – this should be presented as one
net figure under long term assets.
• On the Group Comprehensive Income and Expenditure Statement, the restated figures for 23/24 from the single entity statement had not been updated.
• Per the Remuneration Report, under ‘Other Departures’, there was an exit package incorrectly disclosed as £67,464, which should be £81,937. This means the overall total should be
£242,971, rather than £228,498 (which it is per draft accounts).
30

Page 31

06Fraud considerations

Page 32

Fraud considerations
We have a responsibility to plan and perform our audit to obtain reasonable assurance
that the financial statements are free from material misstatement, whether due to fraud or
error.
Your responsibilities
Management has primary responsibility for the prevention and detection of fraud. It is
important that management, with your oversight, place a strong emphasis on fraud
prevention, which may reduce opportunities for fraud to take place, and fraud deterrence,
which could persuade individuals not to commit fraud because of the likelihood of
detection and punishment. This involves a commitment to creating a culture of honesty
and ethical behaviour which is reinforced by your active oversight.
Our responsibilities
We have a responsibility for obtaining reasonable assurance that the financial statements
taken as a whole are free from material misstatement, whether due to fraud or error. The
distinguishing factor between fraud and error is whether the underlying action that results
in a misstatement is intentional or unintentional. Two types of intentional misstatements
are relevant to us – misstatements resulting from fraudulent financial reporting, and
misstatements resulting from the misappropriation of assets.
ISA presumed fraud risks
As set out in the ‘Audit approach and risk summary’ section, the risks of fraud in
management override of controls was identified as a significant risk.
Our overall approach to fraud
Assignment and supervision Inquired with management and of appropriate audit the Audit and Scrutiny personnel Committee
Obtained written
application of accounting
Evaluated the selection and
representation from
policies management
Incorporated elements of Maintained professional unpredictability into our scepticism audit procedures
Our overall conclusion
We did not identify any actual or suspected fraud involving group or component
management, employees with significant roles in the group’s internal control or
others, where the fraud resulted in a material misstatement in the group financial
statements.
32

Page 33

07Wider Scope

Page 34

Commentary on Wider Scope
Overall Summary

Page 35

Commentary on Wider Scope
Wider Scope summary
As auditors appointed by the Accounts Commission, our wider scope responsibilities are set out in the Code of Audit Practice 2021 and sits alongside Best Value requirements detailed in
the Local Government (Scotland) Act 1973. The Code requirements broaden the scope of the 2024/25 audit and allow us to use a risk-based approach to report on our consideration of
the Council’s performance of best value and community planning duties and make recommendations for improvement and, where appropriate, conclude on the Council’s performance.
The Code’s Wider Scope framework is categorised into four areas:
• financial management;
• financial sustainability;
• vision, leadership and governance; and
• use of resources to improve outcomes.
Overall summary by reporting criteria
From the satisfactory conclusion of our audit work, we have the following conclusions:
Reporting criteria Commentary
page reference Possible significant risks? Significant risks identified? Other recommendations made?
Financial management 36 No No No
Financial sustainability 41 Yes – see page 42. No No
Vision, leadership and
governance 46 Yes – see page 47. No No
Use of resources to improve
outcomes 52 No No No 
35

Page 36

Commentary on Wider Scope
Financial management
Financial management is concerned with financial capacity, sound
budgetary processes and whether the control environment and
internal controls are operating effectively.

Page 37

Financial management (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Financial management
culture The Council demonstrates an effective culture in terms of financial
management. The Council produces an annual Treasury Management
Strategy, an Annual Report, and a detailed Medium Term Financial Plan.
The most recent Medium Term Financial Plan (called 'Budget Outlook
2026-27 to 2030-31') was taken to the Policy and Resources Committee in
December 2025. This noted that the in the mid-range scenario (after
measures to balance the budget), the estimated budget gap would be
£6.2m in 2026-27 and would total £31.1m over the period from 2026-27 to
2030-31. This is based on a 5% increase in council tax (for illustration
purposes), and before other measures to balance the budget are
progressed, including policy savings options.
Budget updates are taken to the Policy and Resources Committee on a
regular, rolling basis throughout the year, with key updates presented
typically in November/December, and a formal budget-setting is reported
in February of each year.
The Council has appropriate and effective
financial management arrangements in
place.
No significant risks identified.
37

Page 38

Financial management (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Financial management
culture (continued) The Council has plans to place to address the funding gap issues it faces
in the future, although some of these plans are still in early stages. These
are based around service transformation (reviewing and redesigning
services to be more efficient/sustainable) and expanding digital services
(investing in technology to enhance and streamline key services). They
also intend to carefully manage reserves and have noted that over-
reliance on reserves is not sustainable or enough to close the budget gap
alone.
We have reviewed the Policy and Resources Committee minutes on a
rolling basis throughout the year and have obtained sufficient assurance
that the Council carefully monitors their financial position and identifies
mitigations that can address issues where necessary. Financial risks are
also reported to the Policy and Resources Committee. The most recent
analysis was presented in December 2025, covering both Council-wide
and departmental risks, with notable risks including severe weather costs,
an unfunded pay award, and a Council Tax income reduction.
(See previous page). (See previous page).
38

Page 39

Financial management (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Accountability Budget reports are presented annually to the Council. The budget for 2025-26 was
presented in February 2025 and covers 2026-27 to 2029-30. As noted above, a
revised Budget Outlook was taken to the Policy and Resources Committee in
December 2025, covering 2026-27 to 2030-31. The budget for 2025/26 has
incorporated several measures to balance the budget - these include an increase in
council tax, management/operational savings, and the use of reserves (£1.558m),
noting that the use of reserves is "one-off in nature", and intended to be used as a
gap reduction in 2025-26 only.
Budget update reports are presented to the Policy and Resources Committee
throughout the year. From of our review of minutes, we have noted that five of these
Committee meetings took place throughout 2025, and budget updates and financial
monitoring reports were presented each time. Our review of these reports also notes
that they contain sufficient detail for Council members to scrutinise.
The Council's general fund reserves as of 31 March 2025 are £112.7m. The Council
has a policy of holding a minimum uncommitted balance of 2% of its budgeted
annual net expenditure, to have a buffer against unforeseen costs or events. Per
Note 6.1 in the financial statements, the Council has a contingency balance of
£6.539m, which is equivalent to 2% of the Council’s budgeted net expenditure for
2025-26.
The Council has appropriate
budget monitoring and
reporting arrangements in
place, with appropriate
contingency funds in place in
accordance with policies.
No significant risks identified.
39

Page 40

Financial management (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Arrangements to prevent
and detect fraud, error and
other regularities, bribery
and corruption
The Council maintains its own fraud and corruption policies. There are
established arrangements for preventing and detecting fraud, including codes
of conduct for officers, an anti-fraud strategy, and a whistleblowing policy.
The Council has an established internal audit team, with regular reports
(including the Internal Audit Plan and Head of Internal Audit Report) being
taken to the Audit and Scrutiny Committee and interrogated by members. The
annual Head Internal Audit report provided a reasonable level of assurance on
the adequacy of internal controls and governance arrangements within the
Council.
We have considered IT general controls and other key business process
controls as part of our audit planning in 2024/25. We did not identify any
significant control issues with the controls in place.
We also received signed letters from both management and the Audit and
Scrutiny committee, which did not raise any issues in terms of controls or
issues throughout the year.
The Council has appropriate
arrangements in place to
prevent and detect fraud and
corruption.
No significant risks identified.
40

Page 41

Commentary on Wider Scope
Financial sustainability
Financial sustainability looks forward to the medium and longer term
to consider whether the body is planning effectively to continue to
deliver its services or the way in which they should be delivered.

Page 42

Financial sustainability (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank
1
Significant Risk in Arrangements Identified Work undertaken and the results of our work
Financial sustainability Work undertaken
Before implementing measures to balance the We reviewed the Council's:
budget, the 2025/26 budget gap stood at £10.938
million. The budget also highlights a gap of - medium to long term financial strategy;
£9.528m in 2026/27 rising to a cumulative budget - financial position and track record in delivering planned recurrent and non-recurrent savings in 2024/25;
gap of £29.537m by the end of 2029/30 based - financial performance in 2024/25 and updates to its financial planning during the year, including the implications for
upon a ‘mid-range’ scenario. The Council’s ‘worst general reserves balances;
case’ scenario highlights a potential £55.999m - regular reporting to members on financial performance, savings plans and financial risks; and
cumulative budget gap by the end of 2029/30. - progress in developing plans to address future year budget gaps.
This represents a risk in relation to financial
sustainability, impacting on the future provision Results of our work
of services in the Council’s area. We have reviewed the Council's Budget Outlook 2026-27 to 2030-31, which was presented to the Policy and
Resources Committee in December 2025. There is a significant funding gap forecast for this period - under a mid-
range scenario, the Council may face a £14.2m funding gap in 2026-27, which could cumulatively rise to £58.5m by
2030-31. Measures to balance the budget of £8m have been identified for 2026-27, reducing the budget gap to
£6.2m, whilst 2030-31 has identified measures of £27.4m to balance the budget, which are based on an indicative
council tax increase of 5%, and before any other measures are presented for decision in February 2026 (such as
Policy savings options).
42

Page 43

Financial sustainability (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank Significant Risk in
Arrangements Identified
1 Financial sustainability
(continued)
Work undertaken and the results of our work
Results of our work (continued)
Under the best-case scenario, a budget gap of £1.4m is predicted in 2026-27, rising to £7.8m over the five-year period. The Council have noted
that this is a difficult outlook for them to face, and any variations in assumptions (especially Scottish Government grant funding) would have a
major impact.
We have also reviewed the Council's revenue budget monitoring report, which was taken to the Council in June 2025. This shows that
performance against budget for 2024-25 was an underspend of £1.905m, which was 0.6% of the net budget for the year (note that this was after
accounting for automatic earmarking, plus two earmarkings approved as part of the 2025-25 budget setting). In terms of performance against
budget, departmental controllable expenditure was £2.2m over budget - this was primarily due to overspends in relation to increases in bus
contracts for school/public transport, increased winter maintenance costs and a saving unachieved in the year relating to a RIS review. There
were also significant costs incurred (£0.79m) in terms of Storm Darragh, which occurred in December 2024. This overspend was offset by an
underspend on Council Central costs (mainly due to a big underspend of £3.3m against budget on the Loans Fund), and a net over recovery of
income of £1.2m in relation to Council Tax performance.
In 2024-25, the General Fund balance decreased by £3.04m, to £112.7m (2023-24 - £115.7m). The decrease was primarily due to funds
earmarked for specific purposes used during the 2024-25 financial period (£26.5m), although this was partially offset by the underspend in 2024-
25 (£1.9m), earmarking previously agreed and created during the year (£13.3m), and new automatic earmarking at the end of 2024-25 (£8.3m).
43

Page 44

Financial sustainability (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank Significant Risk in
Arrangements Identified Work undertaken and the results of our work
1 Financial sustainability
(continued)
Results of our work (continued)
In terms of reporting to members in relation to financial performance, this is done on a regular basis, primarily through the Policy and Resources
Committee. Financial monitoring reports are presented on a bi-monthly basis for revenue, risks and reserves, and on a quarterly basis for capital
and treasury. The most recent report was presented in December 2025 and covers the six-month period to October 2025. The initial revenue
budget for 2026-27 included the delivery of savings options throughout the year, totalling £2.8m. There are 15 options which impact on 2025-26 -
8 of which have been delivered (£1.4m), whilst the remaining 7 (£1.4m) are on track to be delivered. A detailed breakdown of these has been
provided, outlining the approved savings options (which were approved in February 2025), and tracking progress against each one, noting the
future year potential recurring savings as well.
Whilst challenges remain, and we will continue to monitor arrangements in future years, we have concluded that the arrangements described
above mitigate the financial sustainability risk.
44

Page 45

Financial sustainability (continued)
Our overall assessment
Area
assessed Our findings Our
judgements
Significant
risks
identified
Financial
planning There are several papers which have been presented to the Policy and Resources Committee in 2025. These include the Medium-
Term Financial Plan (titled Budget Outlook 2026-27 to 2030-31') presented in December 2025. The Council also produces formal
financial monitoring reports, which cover revenue, capital, reserves, and any associated risks. As noted earlier, financial monitoring
reports are presented on a bi-monthly basis for revenue, risks and reserves, and on a quarterly basis for capital and treasury. We have
reviewed these reports as part of our review minutes. The most recent update was taken to the December 2025 Committee and covers
the financial year up to October 2025.
The updated Budget Outlook paper projects the following cumulative budget gap (based on a mid-range scenario):
- 2026-27: £14.2m
- 2027-28: £29.8m
- 2028-29: £38.9m
- 2029-30: £48.6m
- 2030-31: £58.5m
The main budget pressures identified are in relation to pay awards/staff costs (noting that staffing costs are a significant part of the
Council's budget, and even small increases have a major impact), inflationary pressures, the rising costs of energy and utilities, rising
demand in social care services, and severe weather/climate events. The Council is taking several actions to mitigate the budget gap -
these include streamlining services to increase recurring savings, increasing fees and charges, using reserves carefully (i.e. for short
term issues, rather than for longer term gaps), and using the Council's risk matrix to assess and prioritise any mitigating actions. An
increase of 9.9% in council tax was also approved in February 2025.
In terms of the Council's capital programme, forecast gross expenditure is £212.3m, against an approved budget of £212.1m, showing
a forecast overspend of £0.2m. The report lists progress against the physical delivery of the capital programme (i.e. how many projects
are on track, and how many projects are off track) and considers proposed budget changes. Risks against the capital plan are also
considered - for example, concerns about the uncertainty of future capital receipts, supply chain disruptions, and inflationary pressures.
The Council
have effective
financial
planning
measures in
place and are
conscious of
the
challenging
financial
position that
the Council
faces in future
years.
No significant
risks
identified.
45

Page 46

Commentary on Wider Scope
Vision, leadership and governance
Vision, Leadership and Governance is concerned with the
effectiveness of scrutiny and governance arrangements, leadership
and decision making, and transparent reporting of financial and
performance information.

Page 47

Vision, leadership and governance (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank
1
Significant Risk in Arrangements Identified Work undertaken and the results of our work
Clarity of the strategy, priorities and plans to implement the Work undertaken
vision We reviewed:
The Council's Strategic Plan 2023/2027, also
known as the Corporate Plan, outlines the vision - the Council's progress in implementing its revised Corporate Plan and other key policy documents;
and key commitments for the Council. During the - considered how the Council's revised Corporate Plan maintains clarity of vision, and how changes are
previous year's audit, we noted that the Strategic communicated; and
Plan and other key policy documents were being - how the Council ensures alignment between the Corporate Plan and other key Council strategies, such as
revised due to a change in administration, with an the medium-term financial plan and corporate savings plan).
updated Strategy and other key policy documents
scheduled for publication in March 2025. Results of our work
We therefore consider there to be a risk that these The Council presented their revised Corporate Plan in May 2025, for consideration and approval to go to the
strategic documents may be inconsistent with full Council. We have noted that the Corporate Plan refers to an annual business plan for 2025-26 (which is
other related policy documents, potentially intended to set out deliverables and monitor performance against strategic outcomes), but as noted in the
impacting the clarity of the Council's vision and December 2025 Audit and Scrutiny Committee, this has still not been produced and presented to the Council.
implementation of the administration’s policies. The revised Corporate Plan is available for the public to view on the Council's website.
47

Page 48

Vision, leadership and governance (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Work undertaken and the results of our work
Results of our work (continued)
We have considered the updated Corporate Plan (2025-27) against the older version (Corporate Plan 2023-27), which had been approved by
the Council in June 2023. There is a bigger emphasis on transformation throughout the revised version, which identifies that the Council needs
to increase their transformation activity to address financial sustainability concerns. In terms of key priorities, the revised plan has seven
corporate priorities (relating to communities, children, environment, speaking up for Argyll and Bute, sustainability, transport/infrastructure, and
housing), and they are similar to those in the original version, but again there is a greater emphasis on sustainability and transformation. In
particular, the corporate priority relating to sustainability details the more specific priorities that the Council has, with one of the key points being
that the Council wants to provide the best services they can with the money they have available. Action steps linked to this include making the
most of new digital technologies, such as artificial intelligence.
The revised plan is also supplemented by underpinning principles called Connect for Success. This model has been designed around seven
principles (One Council One Place One Approach, Purpose and Mission Focus, Employee empowerment, Data and evidence driven decision-
making, Learning Council, Agile, and Maximise opportunities that technology offers). These principles are very much linked to the Corporate
Plan itself - for example, maximising the opportunities that technology offers ties into the transformation activities that are embedded within it.
Blank Significant Risk in
Arrangements Identified
1 Clarity of the strategy,
priorities and plans to
implement the vision
(continued)
48

Page 49

Vision, leadership and governance (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank Significant Risk in
Arrangements Identified Work undertaken and the results of our work
1 Clarity of the strategy,
priorities and plans to
implement the vision
(continued)
Results of our work (continued)
The Council have also produced a Corporate Improvement Plan Action Plan 2025-28. This has specific outcomes linked to key areas
(transformation, performance, community engagement, finance, and leadership and workforce) - for example, under transformation, one of the
outcomes is about identifying opportunities to resolve data challenges through the production of Power BI reports, to support the Connect for
Success principle relating to data and evidence driven decision-making. Each outcome is supported by success measures (for example -
increasing available Power BI reports by 6 per quarter), with a people/department lead and target date also attached. Most of these outcomes
have target dates in 2026, with a few in 2027.
Based on the work performed, we believe this risk has been addressed, although we have raised a recommendation in terms of effective
performance management, which is linked to the revised Corporate Plan. Please see page 66 for more detail.
49

Page 50

Vision, leadership and governance (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Significant risks identified
Governance
arrangements
The Council's governance arrangements are in line with the Local Code of
Corporate Governance (the Code), which is consistent with the principles of
the CIPFA/SOLACE revised framework for 'Delivering Good Governance in
Local Government'. The Council publishes an Annual Governance
Statement as part of their annual accounts. There is also a Council
Constitution, which is available on the Council's website, and was last
updated in February 2025 - this covers standing orders, financial
regulations, the scheme of administration and delegation, and ethical
framework that the Council works with.
In terms of oversight, the Council has various committees - these include
Policy and Resources, Development and infrastructure, Community
Services, and Audit and Scrutiny. In particular, the Audit and Scrutiny
committee provides an independent appraisal and scrutiny of the Council's
governance arrangements. Through our review of minutes and attendance
at the Audit and Scrutiny Committee, we have observed effective challenge
from members. The Council meetings are well attended and are open to the
public. Minutes of these meetings can also be viewed on the Council's
website.
The Council’s
governance
arrangements are
appropriate and allow
effective scrutiny and
challenge.
No significant risks identified.
50

Page 51

Vision, leadership and governance (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Significant risks identified
Financial and
performance information Regular financial monitoring reports are presented to the
Policy and Resources Committee. Reports are presented
on a bi-monthly basis for revenue, risks and reserves, and
on a quarterly basis for capital and treasury. These reports
are sufficiently detailed, and cover updates on the revenue
budget, capital programme, reserves position and any
associated financial risks, and the mitigating actions the
Council has in place to address these.
In terms of performance, the Council publishes an Annual
Report each year, which is available to the public. The
purpose of this report is to demonstrate how the Council
has delivered its services throughout the year and
progressed against its corporate priorities. It also
considers the financial position of the Council. The
2024/25 Annual Report was published in October 2025,
and is comprehensive - it contains each corporate
outcome, which is split into separate corporate outcome
indicators. Each indicator has a target attached, and the
Council's progress against this is tracked via numerical
and written data, with historical performance data also
included, alongside commentary where relevant.
The Council's arrangements for
reporting financial and performance
information to board and committees is
conducted effectively.
No significant risks identified.
51

Page 52

Commentary on Wider Scope
Use of resources to improve outcomes
Audited bodies need to make best use of their resources to meet
stated outcomes and improvement objectives, through effective
planning and working with strategic partners and communities. This
includes demonstrating economy, efficiency, and effectiveness
through the use of financial and other resources and reporting
performance against outcomes.

Page 53

Use of resources to improve outcomes (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Resources deployed to
improve strategic
outcomes
The Council's Annual Report for 24/25 demonstrates that their
performance has improved in 2024/25. In terms of the corporate outcome
indicators (of which there are 47 in total), 17 are on track or above target,
10 are off track, under target or have no data, and 20 have no target
attached. The Annual Report also considers the Council's performance
against the Local Government Benchmarking Framework (LGBF). In
2024/25 - 60% of Argyll and Bute Council's indicators were in quartiles 1
and 2 (performance above the Scottish average), whilst only 46% were in
these quartiles in 2023-24.
Service highlights include care services (where 84.2% of care services
were graded as good or better in Care Inspectorate inspections -
considerably higher than the Scottish average of 81.9%), street
cleanliness (80%, which is significantly higher than the nationally
recognised pass rate of 67%), and waste management (achieving 68.3%,
compared to the target of 45%). Lower performing indicators are in terms
of geographical coverage of 4G/5G mobile connectivity (89% against the
target of 95%), percentage of children achieving appropriate development
milestones by Primary 1 (61% against a target of 70%), and distribution of
the Discretionary Housing Payment (DHP) fund (89.2% distributed,
against a target of 96%). For those areas which are not meeting their
targets, action points/plans have been raised within the Annual Report
where relevant.
The Council have effectively deployed
resources to improve strategic outcomes.
No significant risks identified.
53

Page 54

Use of resources to improve outcomes (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Needs of service users
being met In January and February 2025, the Council ran a high-level survey, where they
asked residents of Argyll and Bute what their priorities were in terms of the
services that the Council provides. Feedback was received from 871 residents,
and there were almost 2,000 comments from the respondents. Residents noted
waste management, public transport and roads as being the services that they
used most, whilst roads, waste management and early education were raised
as the areas that are most important for overall wellbeing. The survey also
gathered views around paying more for local services and asked for
suggestions in terms of improving services. This demonstrates that the Council
considers the needs of their service users whilst prioritising spend on services.
The Council's updated Corporate Plan for 2025-27 also evidences that the
needs of service users are considered in terms of future planning. For example,
there are priorities relating to developing school curriculums with jobs of the
future in mind (i.e. ensuring young people are gaining the necessary skillset to
develop a career in the area), transport (designing a new Transport Strategy to
improve connectivity), and goals around environment and sustainability
(consideration of waste policies in terms of cutting carbon emissions). The
updated Corporate Plan demonstrates that service user feedback has been
considered.
The Council considers the needs
of service users and aligns its
planning priorities with these
needs.
No significant risks identified.
54

Page 55

Use of resources to improve outcomes (continued)
Our overall assessment
Area
assessed Our findings Our judgements Significant risks
identified
Arrangements
to deliver
continuous
improvements
in priority
services
The Council's updated Corporate Plan 2025-27 was presented to the Policy and Resources Committee in May 2025.
The plan was updated due to a change in administration. This clearly sets out the Council's seven priority areas as
follows:
- Communities
- Children and young people
- Environment
- Speaking up for Argyll and Bute
- Sustainable service delivery
- Transport, infrastructure and digital connectivity
- Housing, economic growth and population
Each corporate priority is then broken down into smaller, specific priorities (for example, under 'Children and young
people', one of the priorities is 'Develop our school curriculums with the jobs of the future in mind'. Each of these
specific priorities have next steps/action plans noted in the plan. The plan also states that the Council will produce an
annual Business Plan where they set out deliverables and monitor performance against these strategic plans. We have
noted that per the minutes from the Audit and Scrutiny Committee in December 2025, an Annual Business Plan for
2025/26 has not yet been completed and presented. An update of the outcomes from the 2024/25 Business Plan was
presented to the Council in November 2025.
The Council have
arrangements in place to
deliver continuous
improvements in priority
services, although we
have noted that they
have still not produced
an Annual Business Plan
for 2025/26.
No significant
risks identified.
55

Page 56

08Best Value

Page 57

Best Value
Best Value summary
Under the Code of Audit Practice, the audit of Best Value is fully integrated within our annual audit work. We are required to assess the seven Best Value themes at the Council
over the period of the audit appointment. We have used a risk-based approach that is proportionate to the size and type of the body, to assess whether the Council has made
proper arrangements for securing Best Value and is complying with its community planning duties. We have also followed up on previously reported Best Value findings and have
assessed the pace and depth of improvement implemented by the Council.
At least once every five years, the Controller of Audit will report to the Accounts Commission on the Council’s performance in meeting its Best Value duties. We conduct thematic
reviews as directed by the Accounts Commission. In 2024/25 this will be about transformation. The Council is included in the third year of the programme which runs from October
2025 to August 2026. We have prepared a separate management report to document the findings of this work.
Performance Audit and Best Value staff also prepare a report for the Controller of Audit using information and judgements on the pace and depth of continuous improvement
reported in this Annual Audit Report. The Council is not included in the second year of the programme which runs from October 2024 to August 2025.
At the planning stage of the audit, we undertook work to understand the arrangements that the Council has in place under each of the reporting criteria and we considered whether
there were any risks to our audit in those arrangements. We have kept our understanding of arrangements under review and updated our risk assessment throughout the audit to
reflect emerging issues that may suggest significant risks in arrangements exist. The following slides outline the work that we have undertaken for each of the seven Best Value
themes and any improvements or risks in arrangements that have been identified as part of our assessment. We have reported recommendations for the risks identified.
57

Page 58

Best Value (continued)
Overall summary by reporting criteria
From the satisfactory conclusion of our audit work, we have the following conclusions:
Reporting criteria
Commentary
page
reference
Possible significant risks? Significant risks identified? Other recommendations made? Overall conclusion
Best Value 59 No No No Satisfactory.
Effectiveness of
performance reporting 63 Yes No Yes
We have made 1 Level 2
recommendation. Otherwise,
overall conclusion is satisfactory.
Thematic reviews 69 Yes No Yes
We have made 3 Level 2
recommendations. Otherwise,
overall conclusion is satisfactory.
Statutory Performance
Indicators 79 No No No Satisfactory. 
58

Page 59

Best Value (continued)
Our overall assessment
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Vision and
leadership As part of our Wider Scope work, we have
considered:
• The Council’s revised Corporate Plan,
how the vision has evolved and how it
aligns with other strategies.
• The Connect for Success operating
model.
• Evidence of continuous improvement and
transformation.
Please see page 47.
The Council has revised their
Corporate Plan, which has a
clearer focus on transformation,
and is underpinned by the
Connect for Success principles.
Whilst the Council has a clear
strategic direction, it is still in the
earlier stages. This will be
further refined once their Annual
Business Plan for 2025/26 is
produced.
None identified. No significant risks identified.
Governance and
accountability As part of our Wider Scope work, we have
considered:
• Governance arrangements, including
oversight via various committees, and
disclosures per the Annual Governance
statement. Please see page 50.
• Financial management – please see page
37.
The Council has strong
governance arrangements in
place, and we have found
evidence of scrutiny, challenge
and effective decision making
from attendance at Audit
Committees and review of
minutes from Council meetings.
None identified. No significant risks identified.
59

Page 60

Best Value (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Effective use of
resources As part of our Wider Scope work, we have
considered:
• Financial management – including
medium term financial planning, treasury
management and monitoring of financial
risks. Please see page 37.
• Financial sustainability – which considers
whether resources are being used
effectively over the medium and longer
term. Please see page 42.
The Council has an effective
culture in terms of financial
management, with risk
management incorporated
within, and good arrangements
in terms of financial monitoring
and accountability. In terms of
financial sustainability, the
financial outlook is challenging,
but the Council understands the
difficult position and is making
appropriate arrangements to
address this.
None identified. No significant risks identified.
Partnerships and
collaborative
working
As part of our Best Value Thematic Report
work, we have considered:
• How the Council is working with other
bodies to deliver transformational
changes.
• Whether there are any funding
arrangements between the Council and
partners for ongoing projects.
Please see page 69 for more detail.
The Council has worked with
other bodies to deliver change
(for example, they have a
significant joint funding
agreement with the Scottish/UK
Government via the Rural
Growth Deal). They are also
considering a Single Authority
Model, which would involve
collaborating with other bodies
(such as NHS Highland),
although this is still in early
stages.
None identified. No significant risks identified.
60

Page 61

Best Value (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Working with
communities As part of our Wider Scope work, we have
considered:
• The needs of service users, and how the
Council considers the needs of communities in
their plans. Please see page 54.
As part of our Best Value Thematic Report work,
we have considered:
• How the Council has engaged with communities
in transformation projects. Please see page 69.
The Council has
demonstrated effective
engagement with
communities (through
means such as the
resident survey), and this
feeds into their strategic
priorities.
None identified. No significant issues identified.
Sustainability We did not assess this theme in 2023/24. N/A N/A N/A
61

Page 62

Best Value (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Fairness and
equality As part of our Best Value Thematic Report
work, we have considered:
• How the Council is uses Integrated Impact
Assessments to inform their
transformation plans.
Please see page 69 for more detail.
The Council uses Integrated
Impact Assessments to ensure
transformation proposals
consider equality issues (such
as socio-economic impacts and
consumer duty).
None identified. No significant issues identified.
62

Page 63

Best Value (continued)
Effectiveness of performance reporting
Effective performance management arrangements should be in place to promote the effective use of the local authority’s resources. Performance is systematically measured across
all areas of activity, and performance reports are regularly scrutinised by managers and elected members. The performance management system is effective in addressing areas of
underperformance, identifying the scope for improvement and agreeing remedial action.
We have outlined below a summary of what the Council is reporting in relation to service performance including the Council’s assessment of progress against its service priority
measures and reporting on its relative performance (from the Local Government Benchmarking Framework and other information used locally).
63

Page 64

Best Value (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank
1
Significant Risk in Arrangements Identified Work undertaken and the results of our work
Effective performance management Work undertaken
We recommend that the Council ensure We have:
the revised Corporate Plan includes Key
Performance Indicators (KPIs). These KPIs will help • Reviewed the KPI/performance metrics used by the Council, and how these align with the Corporate Plan.
assess Council performance, addressing the risk • Reviewed the appropriateness of KPIs.
that performance may not be effectively monitored. • Reviewed the Council’s updated Corporate Improvement Plan and alignment with other key strategic
documents and understood the Council’s arrangements to monitor and deliver this.
In 2023/24, we reported that the Council's Corporate
Improvement Plan (CIP) concluded in 2022, and the Results of our work
Council intended to publish an updated CIP in Please see the ‘Vision, leadership and governance’ section of our Wider Scope work, where new have
2024/25. Consequently, we identified a risk that the Council reviewed the Council’s updated Corporate Improvement Plan and alignment with other key documents (such
might not track progress in achieving its Connect for as the Medium-Term Financial Plan).
Success objectives. We therefore recommended that the
Council updated its CIP to ensure alignment with other key Performance reports are presented on a quarterly basis for the four main areas (Bute and Cowal, Helensburgh
strategies and plans, including its workforce plan. and Lomond, Mid Argyll, and Oban, Lorn and the Isles). To date in the 2025/26 financial year, updates have
been presented for financial quarter 1 and financial quarter 2. These reports are structured around the
Council's seven corporate priorities, and track progress against each specific outcome. Outcomes have their
progress tracked against historical trends/targets, and a supporting commentary is also provided. We have
noted that some of the outcomes do not have specific targets as such (for example, the number of dog fouling
complaints, although historical data is also provided to track improvements).
64

Page 65

Best Value (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank Significant Risk in Arrangements Identified Work undertaken and the results of our work
1 Effective performance management (continued) Results of our work
The outcomes are based on the Council’s Corporate Plan 2022-2027, although a revised Corporate Plan has
subsequently been produced (2025-27). Thus, the Corporate Outcomes still need to be revised to be fully
aligned with the updated Corporate Plan. The revised Corporate Plan incorporates the 7 key principles of
Connect for Success (maximising technology, agility, one Council, one place, purpose and mission focus,
empowerment, learning Council, and data and evidence driven).
We recommend that the Council’s outcomes are fully aligned with the updated Corporate Plan and have
specific targets which can be tracked.
The Council uses a Performance Improvement Framework to ensure that it delivers upon its strategic priorities
and ensures that the Council delivers Best Value. We have noted that the most recent Performance
Improvement Framework on the Council's website is from 2019, and that the Council's approach to
performance management and reporting is under review. We recommend that an updated copy of this is
published on the Council’s website.
We have raised a recommendation in relation to this – please see the next page.
65

Page 66

’
Best Value (continued)
Identified risks in use of resources to improve outcomes arrangements and recommendations for improvement
As a result of our work we have identified risks in the Council’s Best Value arrangements. These identified risks have been outlined in the table below. We have assigned priority rankings
to each of them to reflect the importance that we consider each poses to your organisation and, hence, our recommendation in terms of the urgency of required action; see Appendix F for
further details.
Bl
an
1
Best Value risks identified Recommendation for improvement k Council s response and implementation timescale
Effective Performance Management – Level 2 The Council should update its corporate outcomes, Management’s response
There is a risk that the Council’s performance so they are fully aligned with the revised Corporate The Council is aligning revised Corporate Outcomes with the
management and reporting arrangements may not Plan, following the change in administration. Each updated Corporate Plan and strengthening performance monitoring,
be fully effective if the Corporate Outcomes are not outcome should include a measurable target to with an updated Performance Improvement Framework to be
fully aligned with the revised Corporate Plan. The enhance performance monitoring. The Council published. This will ensure clearer targets, improved reporting and
Performance Improvement Framework has also not should also ensure their Performance Improvement full alignment of strategic priorities across our planning and
been updated for several years. If not addressed, Framework is fully updated. performance processes.
the Council might struggle to monitor and report
progress against its strategic priorities. Responsible officer
Head of Customer Support Services
Implementation date
By 31st March 2027
66

Page 67

Best Value (continued)
Effectiveness of performance reporting (continued)
Improvement plans reflect a pace and depth of improvement that will lead to the realisation of the local authority’s priorities and the long-term sustainability of services. The Council
should demonstrate a trend of improvement over time in delivering its strategic priorities.
We have outlined below our assessment on whether the Council can demonstrate a trend of improvement over time in delivering its priorities.
Effectiveness
of performance
reporting
theme
Our findings Our judgements Our conclusions Significant risks identified
Improvement
plans The Council produce an Annual Report each year. The aim of this report
is to present to the public an overview of the Council's performance
against its Corporate Plan priorities, and to highlight the Council's
achievements, ongoing challenges and financial performance for the
year. This report incorporates Local Government Benchmarking
Framework (LGBF) data, so the Council can compare and track its
performance against other Scottish authorities. In 2024/25, 60% of the
Council's indicators were in quartiles 1 and 2, meaning their
performance is above the Scottish average. The Council's internal
auditors completed verification work on the data that was returned to the
LGBF and offered a substantial level of assurance for all indicators
reviewed. This was presented to the Audit and Risk Committee in
September 2025
The Annual Report notes that there are improvement plans in key areas
of under-performance (such as financial sustainability, housing and care
services).
The Council’s Annual
Report demonstrates that
they are making
improvements in various
areas, and there are action
plans in place for those
areas that are
underperforming. As noted
earlier, the outcomes are
still aligned with the older
Corporate Plan and should
be updated in line with the
Council’s revised
documents.
Whilst the Council is
addressing
underperformance, its
outcomes need to be
revised in line with the
updated Corporate
Plan.
No additional significant risks
identified.
67

Page 68

Best Value (continued)
Effectiveness of performance reporting (continued)
Improvement plans reflect a pace and depth of improvement that will lead to the realisation of the local authority’s priorities and the long-term sustainability of services. The Council
should demonstrate a trend of improvement over time in delivering its strategic priorities.
We have outlined below our assessment on whether the Council can demonstrate a trend of improvement over time in delivering its priorities.
Effectiveness
of performance
reporting
theme
Our findings Our judgements Our
conclusions Significant risks identified
Improvement
plans (continued) As an example - some care services have been graded as below "good" by the
Care Inspectorate. The Council has an improvement plan in place (recruitment
for more staff, more workforce training), and progress against this is measured
by Care Inspectorate re-inspections and oversight from the Integration Joint
Board committee.
As noted earlier, the Corporate Outcomes included per the Annual Report are
based on the older version of the Corporate Plan (2022-2027) – a new plan
(2025-27) has subsequently been produced.
(See previous page). (See previous
page).
(See previous page).
68

Page 69

Best Value (continued)
Thematic reviews
The Accounts Commission reports nationally on thematic aspects of local government bodies’ approaches to, and performance in, meeting their Best Value and community
planning duties. As appointed auditors of the Council we are required to report on Best Value and related thematic work as prescribed by the Accounts Commission. For the
thematic work in 2024/25, we are required to carry out an overview of transformation. As part of this review, we are required to report on the areas documented in the table below.
Thematic themes Our findings Our judgements Significant risks identified
Transformation
planning The Council has built transformation into its core plans and budget
approach, and a wide range of programmes are underway to help
modernise services and address financial pressures. However,
several key elements, including the overarching Transformation
Strategy, are still at an early stage, so it is not yet possible to
demonstrate their full impact.
The Council is being proactive in
terms of taking steps to embed
transformation into its strategic
plans and should ensure their
overarching Transformation
Strategy has been completed by
March 2026.
As part of our Thematic Report on Transformation,
we have raised the following recommendation:
The Council has not yet produced a
Transformation Strategy – Level 2
The Council should ensure their overarching
Transformation Strategy is produced by their target
date of March 2026 and is followed by a costed
action plan.
Programme
management The Council is developing a Programme Management Office for
transformation activity, although a short life working group has been
appraising different options, Transformation projects are generally
monitored via strategic committees, or through programme boards
and senior management teams. Capacity and specialist skills are
ongoing challenges in term of resourcing transformation projects ,
with a recent employee survey noting that managers leading change
are under workload pressures.
The Council should consider
operating a Programme
Management Office to monitor
their transformation activity. They
should also ensure they have
sufficient resources and capacity
to fulfil transformation projects.
As part of our Thematic Report on Transformation,
we have raised the following recommendations:
The Council does not have a fully operational
Programme Management Office for their
transformation activity – Level 2
The Council should consider the creation of a
Programme Management Office to manage
Transformation and other major projects. This will
ensure oversight and increase the pace of change.
69

Page 70

Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Significant risks identified
Programme
management
(continued)
(See previous page). (See previous page). The Council is facing challenges in terms of
resourcing their transformation programmes
effectively – Level 2
The Council should ensure appropriate resource
and capacity to deliver transformation projects.
70

Page 71

Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Significant risks identified
Partnership working
and community
engagement
The Council has worked with partners on several major initiatives
(such as the ‘Our Modern Workspaces’ project) and is in the early
stages of exploring a potential Single Authority Model, which could
offer a more streamlined structure incorporating NHS Highland, the
Scottish Government and other key partners. Whilst the ongoing
Rural Growth Deal project demonstrates major partnership
investment, this is more ‘investment focused’ in nature, rather than
focusing on delivering savings. The Council is still developing their
Transformation Strategy, which is due to be completed by March
2026.
The Council is actively engaging
with partnership working and
community engagement where
possible.
We have not identified any significant risks in this
section.
Impact of
transformation The Council’s new Corporate Improvement Plan lists priorities in
relation to transformation, such as embedding the ‘Scottish Approach
to Service Design’ and expanding the use of artificial intelligence
technology. However, many of these targets are set for 2026 and
beyond, which means it is still too early to fully assess the impact of
these actions. We have noted that the Council uses Integrated
Impact Assessments to ensure that equality is considered when
putting together transformation proposals.
The Council has good processes
for assessing equality impacts.
We have reviewed a case study
for the ‘Our Modern Workspace’
project, which demonstrated a
positive impact on communities.
A lot of the Council’s other
transformation plans are still in
earlier stages, so it is too early to
assess the full impact that they
have had.
We have not identified any significant risks in this
section.
71

Page 72

Best Value (continued)
Follow up of previously-reported recommendations
We are required to follow up findings from our thematic reviews in the previous years.
In December 2024, we reported 6 recommendations to the Council to address risks identified from our thematic review. As part of our work in 2024/25, we followed up the progress made
by the Council against the recommendations made, and determined whether the risks remained during the year.
b
l
1
Thematic review finding as Management response and a
n previously reported implementation timeframe
k
Work undertaken and judgements made in
2024/25 Conclusions reached
Workforce Data and IT Systems Management Response: The key Conclusions Progress against the recommendation:
outcome here is to ensure the council
The Council has identified it could is able to easily track vacancies. We The Council has engaged with a software supplier, We have noted that the response to this
make better use of the data available will actively engage with our software and they have had an initial assessment carried out. recommendation is still ongoing, and we will
to inform is workforce planning and supplier and will explore all options in The findings from this noted that it is not review the updates as part of our work in
is currently replacing its exiting HR ensuring the council can report on this straightforward to maintain records of vacancies 2025/26.
and Payroll system. important metric. within the configuration of the new HR and payroll
system. The issue will be reviewed and a solution
Implementation timescale: sough when the new recruitment/onboarding
September 2025 functionality is live. The work package for this has
been rescheduled by the Project Board for
completion by the end of March 2026.
Integrating New Strategic Plans Management Response: The people Progress against the recommendation Conclusions
strategy and strategic workforce plan
The new Council administration is will be reviewed annually. The first annual progress report was submitted to Recommendation has been addressed –
bringing an updated Corporate Plan Head of Customer Support Services in December satisfactory.
and strategic frameworks into effect Implementation timescale: June 2025 for management scrutiny. We have reviewed 2 from 2024/25. Existing Workforce 2025 this progress report, and it contains detail on
Plans and People Strategy performance highlights, achievements, key
objectives are to be achieved by challenges for the future, upcoming milestones, and
2028 and may need to be revisited. progress against Key Performance Indicators (such
as turnover rate and average time to hire).
72

Page 73

Best Value (continued)
b
l
a
n
k
Thematic review finding as previously
reported
Management response and
implementation timeframe
Work undertaken and judgements made
in 2024/25 Conclusions reached
3
Review of Flexible Working Policy
The Council is currently in the process of
updating aspects of its operational activities to
accommodate the hybrid working style. This is
based on a newly introduced Flexible and Hybrid
Working policy which is yet to be reviewed.
Management Response: Impact measures
for the flexible and hybrid working policy are
set out in section 10 of the policy document.
These will be monitored and reported
regularly.
Implementation timescale: June 2025
Progress against the recommendation
This action has been completed, and report
presented to the Strategic Management
Team. We have reviewed the report, which
notes that the Council’s flexible working
policy is valued by employees, and there is
minimal evidence that flexible working
influences recruitment or staff leaving.
Recommendations in the report include the
need for clearer processes, and stronger
promotion of the flexible working policy
during recruitment.
Conclusions
Recommendation has been
addressed – satisfactory.
4
Workforce skills and Capacity KPIs
The Council is yet to perform comprehensive
reviews and assessments to determine cost
savings and benefits of its workforce measures.
There is a lack of clear KPI’s that would allow
management to continually monitor savings and
other benefits from workforce skill and capacity
measures.
Management’s response: KPIs for Agile
working will be identified in the project
documentation. General KPIs for Strategic
Workforce plan and People Strategy will be
included in the first annual review (outlined
above)
Implementation timescale: June 2025
Progress against the recommendation
KPIs (Key Performance Indicators) have
been included in the project documentation
for the Agile project. People Strategy KPIs
have been set out in the review document,
and the Council will continue to monitor
these on an annual basis.
Conclusions
Recommendation has been
addressed – satisfactory.
73

Page 74

Best Value (continued)
b
l
a
n
k
Thematic review finding as previously
reported
Management response and
implementation timeframe
Work undertaken and judgements made
in 2024/25 Conclusions reached
5
Agile Project implementation
The Agile Working framework is still at its
inception stage, with a project Initiation document
laying out aims and objectives along with
Success measures. However, there was limited
mention of how these objectives will be achieved,
and SMART targets are yet to be agreed.
Management’s response: Objectives and
Actions for Agile Project will be reviewed
and agreed with ELT
Implementation timescale: April 2025
Progress against the recommendation
Initial goals and actions have been agreed
with the ELT (Executive Leadership Team).
Benchmarking has been undertaken in
relation to generic job descriptions for
admin/project roles.
Conclusions
Recommendation has been
addressed – satisfactory.
6
Workforce Monitoring
The Council has several reviews lined up which
are targeted for completion within the 24/25
Financial year, looking at Workforce Planning
measures and other projects which have recently
been implemented.
Management’s response: The HR and OD
manager will provide a 6 monthly progress
report on actions within the workplan
specifically linked to workforce planning or
people strategy actions.
Implementation timescale: September
2025
Progress against the recommendation
A monthly highlight report is presented to the
Head of Customer Support Services, and this
includes updates on priority actions linked to
the People Strategy and Strategic Workforce
plan. Progress reporting will be added to the
service quarterly reporting dashboard by
31/03/2026.
Conclusions
We have noted that the response
to this recommendation is still
ongoing, and we will review the
Council’s progress reporting
implementation as part of our work
in 2025/26.
74

Page 75

Best Value (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank
1
Significant Risk in Arrangements Identified Work undertaken and the results of our work
Agency staff costs Work undertaken
In 2023/24, we reported that workforce trends
outlined in the Strategic Workforce Planning We performed the following work:
Priorities indicated that temporary and casual
staff increased to approximately 16% of the • Updated our understanding of the Council’s arrangements for monitoring and reporting the impact of high turnover of
workforce. We therefore highlighted a risk that staff, and agency staff.
high turnover of staff and reliance on agency • Updated our understanding of the strategies and plans the Council has implemented to mitigate the risks associated with
recruitment may result in increased costs and the current turnover levels.
diminished service quality.
Results of our work
The Council’s spend on agency staff is monitored via their financial monitoring reports, which are taken to the Policy and
Resources Committee. These show actual employee costs against budgeted employee costs, and the reasons for these
variances. Where agency staff have been used to cover vacancies, this has been explained. These reports also include key
financial challenges, and agency staff costs are mentioned within this. For example, the October 2025 financial monitoring
report states that spend on agency staff to support Social Work is a key challenge, due to recruitment and retention
challenges. It is evident that agency staff costs are still creating pressure for the Council, but these are being actively
monitored. The financial monitoring reports also contain proposed actions to address financial challenges. In terms of
agency staff costs (for Social Work), the Council have stated that they intend to utilise their close working relationship with
the Health and Social Care Partnership to support the costing of a plan to stabilise the service. This also includes an exit
plan from the reliance on agency staff.
75

Page 76

Best Value (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank Significant Risk in Arrangements Identified Work undertaken and the results of our work
1 Agency staff costs (continued) Results of our work
For social work (which is the main area impacted by agency staff costs), the workforce is monitored through reports
produced by Argyll and Bute Integration Joint Board (which is one of the Council’s joint ventures, with NHS Highland). These
reports contain detailed data covering current headcounts, turnover levels, vacancy levels and detail around appraisals and
training. This demonstrates that there are systems in place for collecting and reviewing workforce data. The data relating to
appraisals (in the Council, these are less formalised and known as ‘quality conversations’) and training is notable, as these
conversations allow employees and managers to discuss goals and learning/development needs. The aim of these
conversations is to enhance employee satisfaction, which ultimately should lead to smaller turnover rates.
Whilst agency staff are used to maintain safe staffing levels, the Council/Integration Joint Board have noted this is not a
long-term solution. The evidence we have reviewed above demonstrates that the Council are aware of this, are actively
tracking their staff data, and are identifying ways to decrease staff turnover and reliance on agency staff.
76

Page 77

Best Value (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank
1
Significant Risk in Arrangements Identified Work undertaken and the results of our work
Workforce Strategy Work undertaken
In 2023/24, we reported that the Council had
implemented a new people strategy and strategic We performed the following work:
workforce plan, extending to 2028. We identified
a risk that the Council's strategic workforce plans • Reviewed Council’s strategic workforce plan to understand alignment with other strategic documents.
may not be aligned with the updated Corporate • Considered key assumptions used in developing plan.
Plan and other key strategies, including the • Update understanding of how updates to workforce strategy inform budget reporting.
MTFP. There is a risk that workforce planning
does not align with other strategic plans, including
the MTFP. Results of our work
We have reviewed the Council’s updated Corporate Plan 2025-27 and compared this against the Strategic Workforce
Planning Priorities for 2024-28, alongside other key strategic documents. Although the Workforce Planning was produced
before the updated Corporate Plan (following a change in administration), the two documents show alignment. Workforce
priorities are a key part of the Council’s transformation agenda, and ensuring the Council’s transformation activities can be
resourced efficiently. The Workforce Strategy is also aligned and underpinned by the principles of the Council’s Connect for
Success People Strategy. This presents key themes in relation to people, including attracting and keeping talented people,
providing a positive employee experience, supporting learning and growth, and championing change and innovation. Each
of these themes has a more detailed explanation and list of commitments over the life of the strategy, and is also linked to
the relevant overarching Connect for Success theme (such as Purpose and Mission, Empowerment etc.)
77

Page 78

Best Value (continued)
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of those
risks.
Blank Significant Risk in Arrangements Identified Work undertaken and the results of our work
1 Workforce Strategy (continued) Results of our work
There are several assumptions which underpin the Workforce Planning. For example, in terms of technology, this is
expected to create capacity and opportunities for redesign in the workforce, and there are likely to be efficiencies that can be
gained from new technologies, such as artificial intelligence. This again links to the Council’s Corporate Plan 2025-27, which
recognises transformation as a key driver for the Council in the future. There are several other assumptions included,
including working pattern assumptions (with the assumption that hybrid/flexible working will continue in the future, which is in
line with the Council’s approach to working, and assumptions relating to workforce supply and demand, recognising the
temporary/agency arrangements are likely to continue to some extent in the future). These assumptions are all reasonable,
and in line with our knowledge of the Council.
The Council’s Workforce Strategy impacts upon their budgeting and financial monitoring, with the Council recognising that a
significant percentage of the budget is allocated to staff costs. The assumptions allow the Council to evaluate their future
spending in terms of staff costs, and identify potential savings (for example, using new technologies to streamline tasks
where possible), and to identify areas where costs might be likely to rise (for example, agency costs).
Overall, we are satisfied that the Council’s Workforce Strategy contains appropriate assumptions, is aligned with other
strategic documents, and influences the Council’s budgeting reporting.
78

Page 79

’
Best Value (continued)
Statutory Performance Indicators
We are required to report on the Council’s effectiveness and appropriateness of arrangements in place for complying with the Direction issued in December 2021, including the
balance and timeliness of reporting to members along with its accessibility for citizens and communities.
The table below details our overall assessment of the Council’s statutory performance indicators arrangements:
Council s
arrangements Our findings Our judgements Significant risks identified
Statutory
Performance
Indicator 1:
Improving local
services and local
outcomes
Through the Council's Annual Report, they have provided a balanced
view of how their services are performing regarding their strategic
priorities. Whilst achievements are highlighted throughout, there is
also evidence that weaker areas have been considered, and steps to
improve local services and outcomes have been listed.
It is also clear that communities have been involved in terms of
agreeing outcomes with partners. These outcomes have been
developed alongside the Community Planning Partnership, which
comprises bodies from the public sector, third sector and local
communities.
The Council have also used the Local Government Benchmarking
Framework (LGBF) to monitor their performance against other
Scottish Councils. The Council's Annual Report demonstrates that
performance has improved over the last year - 60% of their indicators
are now in quartile 1 or 2 (compared to 46% in the previous year),
which demonstrates performance is above the Scottish average.
The Council has appropriate
arrangements in place to comply
with Statutory Performance
Indicator 1.
No significant risks identified.
79

Page 80

’
Best Value (continued)
Statutory Performance Indicators
We are required to report on the Council’s effectiveness and appropriateness of arrangements in place for complying with the Direction issued in December 2021, including the
balance and timeliness of reporting to members along with its accessibility for citizens and communities.
The table below details our overall assessment of the Council’s statutory performance indicators arrangements:
Council s
arrangements Our findings Our judgements Significant risks identified
Statutory
Performance
Indicator 2:
Demonstrating Best
Value
The Council's Annual Report demonstrates that it assesses its
performance in terms of Best Value. The Council reports across their
key service lines (including education, social care and housing) in
terms of corporate outcomes, including results of inspections and
reviews. Examples include:
• Percentage of children living in poverty
• Percentage of apprentices who find success after completing the
Modern Apprentice Programme
• Number of affordable social sector new builds completed
This is also interrogated by members across various committees,
such as the Policy and Resources committee, and service-specific
groups. The Council ensures that its reporting is accessible across
diverse communities - for example, reports are published
electronically, but alternative versions such as large print/translated
copies are also available.
The Council also considers results from external bodies who provide
scrutiny - form example, the percentage of care services that are
graded as 'good' or better in Care Inspectorate inspections.
The Council has appropriate
arrangements in place to comply
with Statutory Performance
Indicator 2.
No significant risks identified.
80

Page 81

AAppendices
A: Internal control conclusions
B: Draft management representation letter
C: Draft audit report
D: Confirmation of our independence
E: Other communications
F: Wider scope ratings
G: Current year updates, forthcoming accounting & other issues

Page 82

Appendix A: Internal control conclusions
Other deficiencies in internal control
A deficiency in internal control exists if:
• A control is designed, implemented, or operated in such a way that it is unable to prevent, detect, and/ or correct potential misstatements in the financial statements; or
• A control that is necessary to prevent, detect, and/ or correct misstatements in the financial statements on a timely basis is missing.
The purpose of our audit was to express an opinion on the financial statements. As part of our audit, we have considered the Council’s internal controls relevant to the preparation of the
financial statements to design audit procedures to allow us to express an opinion on the financial statements, but not for the purpose of expressing an opinion on the effectiveness of the
Council’s internal controls or to identify any significant deficiencies in their design or operation.
The matters reported in Appendix A are limited to those deficiencies and other control recommendations that we have identified during our normal audit procedures and which we
consider to be of sufficient importance to merit being reported. If we had performed more extensive procedures on internal control, we might have identified more deficiencies to report or
concluded that some of the reported deficiencies need not in fact have been reported. Our comments in Appendix A should not be regarded as a comprehensive record of all deficiencies
that may exist or improvements that could be made.
This Appendix sets out the internal control observations that we have identified as at the date of this report. These control observations are not, in our view, significant control deficiencies
but have been reported to management directly and are included in this report for your information. In our view, there is a need to address the deficiencies in internal control set out in this
section to strengthen internal control or enhance business efficiency. Our recommendations should be actioned by management in the near future.
82

Page 83

Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Provision of Employee Contracts
Description of deficiency
During the testing of payroll expenses, we experienced difficulty in sourcing the original contracts for the majority of individuals selected. Thus, the Council provided alternatives
such as Offer of Appointment and Contractual Amendments as well as agreeing employee details to the Council's iTrent system.
Potential effects
The provision of original contracts confirms that an individual is legitimately employed and that an individual is acknowledges the conditions of their employment. Thus, due to the
Council's inability to provide contracts for all the samples tested increases the risk of payments being made to employees who do not exist.
Recommendation
The Council should ensure that they retain a copy of the latest employee contract for each employee as evidence of legitimate employment.
Management response
For long-standing employees in particular, original contracts are not always available due to the age of records. Employment is evidenced through alternative documentation and
system records. The Council continues work to ensure the latest contractual terms are retained and accessible going forward.
83

Page 84

Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Historic split between Education and Social Work expenditure
Description of deficiency
During the testing of expenditure, we identified that some expenditure is split between Education and Social Work. Upon enquiry of the split, the Council stated that it is an agreed
historic split between Education and Social Work (62% SW and 38% E). It has been the same rates for years, they believe it is based on the percentage of time that relates to the
residential element of the placement and the proportion of education but there is no specific calculation.
Potential effects
There is a risk that expenditure for each service department is misstated due to the reliance on this historic split and the absence of a review of this calculation. The historic split
may no longer accurately reflect the percentage of time spent in each area.
Recommendation
The Council should review this historic split to ensure it is still appropriate.
Management response
The appropriateness of the split will be reviewed to confirm if it remains reflective of service activity.
84

Page 85

Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Loans Fund – Treasury Management Strategy
Description of deficiency
Having reviewed the 2024/25 and 2025/26 Treasury Management Strategy reports, and the 2024/25 Treasury Management Annual Report, the Council is yet to disclose a
breakdown of the future Loans Fund repayments as required by the Local Government Finance Circular 7-2024 - Loans Fund Accounting.
Potential effects
If no detailed repayment breakdown is provided, it makes it more difficult for Councillors/the public to understand the long-term impact of the Council's borrowing.
Recommendation
The Council should review the latest Finance Circular regarding Loans Fund Accounting (7-2024) and ensure all Treasury Management reports are prepared in accordance with
the Scottish Government's requirements.
Management response
The Council will review the 2026/27 reports and include a table setting out future Loans Fund repayments to ensure alignment with the disclosure requirements.
85

Page 86

Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Cash and Cash Equivalents – Missing reconciliation
Description of deficiency
Council is unable to provide a reconciliation for the 'LEADER Plus' Bank Account as they cannot find this amount in the ledger. We know the amount (£1k) exists as we have
obtained the bank confirmation. Therefore, there is a difference between ledger amount and actual monies held. The initial scheme was in 2000-2006 so pre-dates their current
accounting system. It appears that it’s most likely that they distributed funds and this account may have been ring-fenced for that purpose as EU funding often required
demonstrable ring-fencing.
Potential effects
There is a risk that the amounts held differ from the amounts reported.
Recommendation
The Council should ensure the ledger reflects actual monies held.
Management response
Further work will be undertaken to determine the most appropriate accounting treatment and ensure the ledger reflects the actual monies held.
86

Page 87

Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Payroll Data Migration – No formal rollback activities
Description of deficiency
Based on our inquiry with the client and review of the data migration project management controls, the following artifacts/documents were not available for our review:
• Roll-Back Plan: A rollback plan did not exist. It was understood Rollback activities were intended to be performed by the Payroll Team on an as-needed basis, with any
corrective actions coordinated with the Systems Development Team. §
• Roll-Back Activities: A rollback procedure was executed in December 2024 after the payroll period was incorrectly advanced to February 2025 instead of January 2025. The
issue was successfully corrected; however, the process lacked a formal logging mechanism and a structured audit trail was not maintained.
Potential effects
Absence of appropriate project management procedures/controls may lead to the following:
• High-level rollback documentation may prevent effective system restoration if the migration fails.
• Incomplete governance documentation reduces assurance over the integrity and control of the migration process.
• Missing project artefacts weaken auditability and evidence of compliance with project management and IT governance standards
Recommendation
The Council should introduce a Roll-Back Plan for any future system changes. All activity should also be logged to create a clear audit trail.
Management response
This issue arose during the one-off implementation of the new payroll system in 2024/25 and has now passed. However, the Council will ensure that formal rollback plans and
audit-trail logging are built into any future one-off system changes to strengthen governance and assurance.
87

Page 88

Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points
We set out below an update on internal control points raised in prior periods.
Property Plant and Equipment Valuation Reconciliations - Brought Forward from Prior Year
Description of deficiency
The Council has improved its reconciliations in regard to results of revaluation exercises and summaries in that it now prepares and maintains a file reconciling the results of the
inhouse valuation process undertaken under Programme 1 and Programme 2 to the associated disclosure note in the financial statements. Nonetheless, there is scope to improve the
reconciliations further by maintaining clear records on how area inputs are recorded as in some instances these details were difficult to agree to the underlying records.
Current year update: The Council continues to produce Programme 1 and 2 documents with summaries of revalued assets. It also produces a document summarising the valuation
dates and type for all assets allowing reconciliation to be performed. There is still potential for layout of this to be improved.
Potential effects
The lack of this reconciliation contributed to making this audit area time consuming to reconcile the area values in the valuation reports with the underlying supporting documents for
instance the maps and architects’ area schedules. This also led to additional requests being made during the audit process.
Recommendation
As regular practice, management should prepare and maintain a reconciliation of the results of any revaluation exercises conducted with the fixed asset registers/general ledger and
maintain summaries that agree as appropriate including to the underlying supporting records such as maps and architects’ plans.
Management response (updated for 24/25)
Further refinement of supporting area records will be progressed as part of ongoing process improvements.
88

Page 89

Appendix A: Internal control conclusions (continued)
Dormant/Inactive Bank Accounts
Description of deficiency
We noted that the Argyll and Bute Council administers numerous bank accounts, several of which were dormant during the period. From our audit testing, it is not clear whether these
accounts are actively monitored, due to the low level of activity in each.
Current year update: There are still some accounts that appear dormant/inactive. One bank account has been closed in the period. Upon discussion with management they intend to
leave some of the accounts with low balances open for similar reasons.
Potential effects
Bank statements should be obtained and reconciliations performed for all bank accounts, including those with zero balances and little or no activity, by a member of the finance group
who does not have access to withdraw from the accounts. These reconciliations should be independently reviewed by a person independent of the reconciliation process. Maintaining
and monitoring dormant/inactive accounts uses resources that could be better used elsewhere and may present an opportunity for the account to be used for inappropriate or
fraudulent purposes.
Recommendation
A review of open bank accounts should be carried out periodically to identify dormant accounts. Any accounts that are no longer required should be closed as soon as possible.
Management response (updated for 24/25)
A small number of low activity accounts remain open for operational reasons and will continue to be monitored through regular bank reconciliations.
89

Page 90

Appendix A: Internal control conclusions (continued)
Inconsistency in Related Party Records
Description of deficiency
Our testing on related parties identified that one Policy Lead for Health and Social Care is disclosed in the Senior Councillors Remuneration in the accounts but not on the website of
the Council.
Current year update: No such issues were noted during our testing in the 2024/25 audit.
Potential effects
Inconsistent related party information could be misleading to users of the financial statements/members of the public who access the Council’s website for accountability.
Recommendation
Management should perform an exercise regularly to ensure that there is consistency of disclosure between the financial statements’ information and the Council website.
Management response
Management accepts that process improvements could be made to minimise the risk of any future discrepancies. Action will be taken to ensure that information is disclosed
consistently between the annual accounts and the Council website, through performing regular reconciliations.
90

Page 91

Appendix A: Internal control conclusions (continued)
Property Plant and Equipment Valuations - Concerto system
Description of deficiency
We noted that during testing of PPE valuations the asset records and floor areas held on the Concerto system were inconsistent with area inputs used in the valuer certificates. It was
noted that not all additions/ amendments to asset areas were updated.
Current year update: There are still some differences across the area inputs used by the valuer and asset records/floor areas on Concerto system.
Potential effects
The lack of this reconciliation contributed to making this audit area time consuming to reconcile the area values in the valuation reports with the underlying supporting documents for
instance the maps and architects’ area schedules. This also led to additional requests being made during the audit process.
Recommendation
Management should ensure there are clear controls and processes in place to ensure that information on Concerto is kept accurate and up to date.
Management response (updated for 24/25)
The geography of Argyll and Bute makes it difficult to inspect and measure all properties so existing records are relied upon in some circumstances supplemented by information from
other sources such as the Assessor. As part of the rolling programme there is an ongoing process to continue to improve records and consistency within the available resources.
91

Page 92

Appendix A: Internal control conclusions (continued)
Expected Credit Loss
Description of deficiency
We noted during our testing of Debtors, when considering the application of the CIPFA Code/IFRS 9 Financial Statements in relation to expected credit losses, that the Council had not
done a detailed assessment of the Expected Credit loss for the year.
Current year update: No such issues were noted in the 24/25 audit during our testing.
Potential effects
Non-compliance with the Code’s requirements on Expected Credit Losses.
Recommendation
We recommend that the Council management should ensure the Expected Credit loss calculation for the Council includes an assessment of the losses on the basis of 12-month
expected losses for the qualifying debtors.
92

Page 93

Appendix B: Draft management representation letter
Mark Outterside
Forvis Mazars
The Corner
26 Mosley Street
Newcastle upon Tyne
NE1 1DF
DD/MM/2026
Dear Mark,
Argyll and Bute Council - Audit for Year Ended 31 March 2025
This representation letter is provided in connection with your audit of the financial statements of Argyll and Bute Council (the Council) and Group for the year ended 31 March 2025 for
the purpose of expressing an opinion as to whether the financial statements give a true and fair view in accordance with the CIPFA/LASAAC Code of Practice on Local Authority
Accounting in the United Kingdom 2024/25 (the Code), and applicable law.
I confirm that the following representations are made on the basis of enquiries of management and staff with relevant knowledge and experience (and, where appropriate, inspection of
supporting documentation) sufficient to satisfy myself that I can properly make each of the following representations to you.
93

Page 94

Appendix B: Draft management representation letter
My responsibility for the financial statements and accounting information
I believe that I have fulfilled my responsibilities for the true and fair presentation and preparation of the financial statements in accordance with the Code, as amended by applicable law.
My responsibility to provide and disclose relevant information
I have provided you with:
• access to all information of which I am aware that is relevant to the preparation of the financial statements such as records, documentation and other material;
• additional information that you have requested from us for the purpose of the audit; and
• unrestricted access to individuals within the Council and Group you determined it was necessary to contact in order to obtain audit evidence.
I confirm as Section 95 Officer that I have taken all the necessary steps to make me aware of any relevant audit information and to establish that you, as auditors, are aware of this
information.
As far as I am aware there is no relevant audit information of which you, as auditors, are unaware.
I confirm that there is no information provided to you as part of the audit that I consider legally privileged.
Accounting records
I confirm that all transactions that have a material effect on the financial statements have been recorded in the accounting records and are reflected in the financial statements. All other
records and related information, including minutes of all Council and committee meetings, have been made available to you.
Accounting policies
I confirm that I have reviewed the accounting policies applied during the year in accordance with International Accounting Standard 8 and consider these policies to faithfully represent
the effects of transactions, other events or conditions on the Council and Group’s financial position, financial performance and cash flows.
94

Page 95

Appendix B: Draft management representation letter
Accounting estimates, including those measured at fair value
I confirm that the methods, significant assumptions and the data used by the Council and Group in making the accounting estimates, including those measured at fair value, are
appropriate to achieve recognition, measurement or disclosure that is in accordance with the applicable financial reporting framework.
Contingencies
There are no material contingent losses including pending or potential litigation that should be accrued where:
• information presently available indicates that it is probable that an asset has been impaired or a liability had been incurred at the balance sheet date; and
• the amount of the loss can be reasonably estimated.
There are no material contingent losses that should be disclosed where, although either or both the conditions specified above are not met, there is a reasonable possibility that a loss,
or a loss greater than that accrued, may have been incurred at the balance sheet date.
There are no contingent gains which should be disclosed.
All material matters, including unasserted claims, that may result in litigation against the Council and Group have been brought to your attention. All known actual or possible litigation
and claims whose effects should be considered when preparing the financial statements have been disclosed to you and accounted for and disclosed in accordance with the Code, as
amended by applicable law.
Laws and regulations
I confirm that I have disclosed to you all those events of which I am aware which involve known or suspected non-compliance with laws and regulations, together with the actual or
contingent consequences which may arise therefrom.
The Council and Group has complied with all aspects of contractual agreements that would have a material effect on the accounts in the event of non-compliance.
95

Page 96

Appendix B: Draft management representation letter
Fraud and error
I acknowledge my responsibility as Section 95 Officer for the design, implementation and maintenance of internal control to prevent and detect fraud and error and I believe I have
appropriately fulfilled those responsibilities.
I have disclosed to you:
• all the results of my assessment of the risk that the financial statements may be materially misstated as a result of fraud;
• all knowledge of fraud or suspected fraud affecting the Council and Group involving:
- management and those charged with governance;
- employees who have significant roles in internal control; and
- others where fraud could have a material effect on the financial statements.
I have disclosed to you all information in relation to any allegations of fraud, or suspected fraud, affecting the Council and Group’s financial statements communicated by employees,
former employees, analysts, regulators or others.
Related party transactions
I confirm that all related party relationships, transactions and balances, have been appropriately accounted for and disclosed in accordance with the requirements of the Code, as
amended applicable law.
I have disclosed to you the identity of the Council and Group’s related parties and all related party relationships and transactions of which I am aware.
Future commitments
The Council and Group has no plans, intentions or commitments that may materially affect the carrying value or classification of assets and liabilities or give rise to additional liabilities.
96

Page 97

Appendix B: Draft management representation letter
Service Concession Arrangements
I am not aware of any material contract variations, payment deductions or additional service charges in 2024/25 in relation to the Council and Group’s service concession arrangements
that you have not been made aware of.
Subsequent events
I confirm all events subsequent to the date of the financial statements and for which the Code, as amended by applicable law, require adjustment or disclosure have been adjusted or
disclosed.
Should further material events occur after the date of this letter which may necessitate revision of the figures included in the financial statements or inclusion of a note thereto, I will
advise you accordingly.
Going concern
To the best of my knowledge there is nothing to indicate that the Council and Group will not continue as a going concern in the foreseeable future. The period to which I have paid
particular attention in assessing the appropriateness of the going concern basis is not less than twelve months from the date of approval of the accounts.
Annual Governance Statement
I am satisfied that the Annual Governance Statement (AGS) fairly reflects the Council and Group’s risk assurance and governance framework and I confirm that I am not aware of any
significant risks that are not disclosed within the AGS.
Annual Report
The disclosures within the Annual Report and Remuneration Report fairly reflect my understanding of the Council and Group’s financial and operating performance over the period
covered by the financial statements.
97

Page 98

Appendix B: Draft management representation letter
Unadjusted misstatements
I confirm that the effects of the uncorrected misstatements are immaterial, both individually and in aggregate, to the financial statements as a whole. A list of the uncorrected
misstatements is attached to this letter as an Appendix. Please make sure the appendix is attached to the letter and not cross-referenced to the appendix in the Annual Audit Report.
Prior period adjustments
A prior period adjustment/reclassification was identified and impacted upon the figures in [applicable accounts].
As a result, the prior period figures have been restated. I confirm that I have disclosed to you all the relevant information to support the prior period adjustment and its disclosure notes
within the financial statements and I deem the disclosure to be complete and accurate to the best of my knowledge.
Yours faithfully,
Kirsty Flanagan
Section 95 Officer
Date: XXXX
98

Page 99

Appendix C: Draft audit report
Independent auditor’s report to the members of Argyll and Bute Council and the Accounts Commission
Report on the audit of the financial statements
Opinion on the financial statements
We certify that we have audited the financial statements in the annual accounts of Argyll and Bute Council and its group (“the Council”) for the year ended 31 March 2025 under Part VII
of the Local Government (Scotland) Act 1973. The financial statements comprise the Comprehensive Income and Expenditure Statement, the Movement in Reserves Statement, the
Balance Sheet, the Cash Flow Statement and notes to the financial statements, including material accounting policy information. The financial reporting framework that has been applied
in their preparation is applicable law and UK adopted international accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United
Kingdom 2024/25 (the 2024/25 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the Council and its group as at 31 March 2025 and of its income and expenditure of the Council and its group for the year then ended;
• have been properly prepared in accordance with UK adopted international accounting standards, as interpreted and adapted by the 2024/25 Code; and
• have been prepared in accordance with the requirements of the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local
Government in Scotland Act 2003.
Basis for opinion
We conducted our audit in accordance with applicable law and International Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. Our responsibilities under those standards are further described in the auditor’s responsibilities for the audit of the financial statements section of our
report. We were appointed by the Accounts Commission on 18 May 2022. Our period of appointment is five years, covering 2022/23 to 2026/27. We are independent of the Council and
its group in accordance with the ethical requirements that are relevant to our audit of the financial statements in the UK including the Financial Reporting Council’s Ethical Standard, and
we have fulfilled our other ethical responsibilities in accordance with these requirements. Non-audit services prohibited by the Ethical Standard were not provided to the Council. We
believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the preparation of the financial statements is appropriate.
99

Page 100

Appendix C: Draft audit report
Based on the work we have performed, we have not identified any material uncertainties relating to events or conditions that, individually or collectively, may cast significant doubt on the
ability of the Council and its group to continue to adopt the going concern basis of accounting for a period of at least twelve months from when the financial statements are authorised for
issue.
These conclusions are not intended to, nor do they, provide assurance on the current or future financial sustainability of the Council and its group. However, we report on the Council's
arrangements for financial sustainability in a separate Annual Audit Report available from the Audit Scotland Website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of material misstatement that we identified and our judgements thereon.
Responsibilities of the Section 95 Officer and the Audit and Scrutiny Committee for the financial statements
As explained more fully in the Statement of Responsibilities, the Section 95 Officer is responsible for the preparation of financial statements, that give a true and fair view in accordance
with the financial reporting framework, and for such internal control as the Section 95 Officer determines is necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
In preparing the financial statements, the Section 95 Officer is responsible for assessing the ability of the Council and its group to continue as a going concern, disclosing, as applicable,
matters related to going concern and using the going concern basis of accounting unless there is an intention to discontinue the operations of the Council and its group.
The Audit and Scrutiny Committee is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always
detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be
expected to influence the decisions of users taken on the basis of these financial statements.
100

Page 101

Appendix C: Draft audit report
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design procedures in line with our responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• using our understanding of the local government sector to identify that the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the
Local Government in Scotland Act 2003 are significant in the context of the Council and its group;
• inquiring of the Section 95 Officer as to other laws or regulations that may be expected to have a fundamental effect on the operations of the Council and its group;
• inquiring of the Section 95 Officer concerning the policies and procedures of the Council and its group regarding compliance with the applicable legal and regulatory framework;
• discussions among our audit team on the susceptibility of the financial statements to material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which our procedures are capable of detecting irregularities, including fraud, is affected by the inherent difficulty in detecting irregularities, the effectiveness of the Council‘s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that result from error as fraud may involve collusion, intentional omissions, misrepresentations,
or the override of internal control. The capability of the audit to detect fraud and other irregularities depends on factors such as the skilfulness of the perpetrator, the frequency and
extent of manipulation, the degree of collusion involved, the relative size of individual amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In our opinion, the audited parts of the Remuneration Report have been properly prepared in accordance
with The Local Authority Accounts (Scotland) Regulations 2014.
Other information
The Section 95 Officer is responsible for the other information in the annual accounts. The other information comprises the Management Commentary, Annual Governance Statement,
Statement of Responsibilities and the unaudited part of the Remuneration Report.
101

Page 102

Appendix C: Draft audit report
Our responsibility is to read all the other information and, in doing so, consider whether the other information is materially inconsistent with the financial statements or our knowledge
obtained in the course of the audit or otherwise appears to be materially misstated. If we identify such material inconsistencies or apparent material misstatements, we are required to
determine whether this gives rise to a material misstatement in the financial statements themselves. If, based on the work we have performed, we conclude that there is a material
misstatement of this other information, we are required to report that fact. We have nothing to report in this regard.
Our opinion on the financial statements does not cover the other information and we do not express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year for which the financial statements are prepared is consistent with the financial statements and that report
has been prepared in accordance with statutory guidance issued under the Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial year for which the financial statements are prepared is consistent with the financial statements and that
report has been prepared in accordance with the Delivering Good Governance in Local Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report are not in agreement with the accounting records; or
• we have not received all the information and explanations we require for our audit.
We have nothing to report in respect of these matters.
102

Page 103

Appendix C: Draft audit report
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the wider scope responsibilities specified in the Code of Audit Practice, including those in respect of Best
Value, are set out in our Annual Audit Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, we do not undertake to have responsibilities to members or officers, in their individual capacities, or to third parties.
[Signature]
Mark Outterside, Director
For and on behalf of Forvis Mazars LLP
Forvis Mazars LLP
26 Mosley Street
Newcastle upon Tyne
NE1 1DF
XX January 2026
103

Page 104

Appendix D: Confirmation of our independence
We communicate any matters which we believe may have a bearing on the independence or the objectivity of Forvis Mazars LLP and the audit team. As part of our ongoing risk
assessment, we monitor our relationships with you to identify any new actual or perceived threats to our independence within the regulatory or professional requirements governing us as
your auditors.
We confirm that no new threats to independence have been identified since issuing our Annual Audit Plan and therefore we remain independent.
104

Page 105

Appendix D: Confirmation of our independence (continued)
Fees for work as the Council’s auditor
We reported our proposed fees for the delivery of our work under the Code of Audit
Practice in our Annual Audit Plan presented to the Audit and Scrutiny Committee in
June 2025. Having substantially completed our work for the 2024/25 financial year,
we can confirm that our fees are as follows:
Area of work 2024/25 fees 2023/24 fees
Auditor remuneration £262,260 £251,690
Pooled costs £6,590 £9,170
Contribution to PABV costs £60,940 £63,850
Sectoral cap adjustment £1,010 £(110)
Total fees £330,800 £324,600   
Fees for other work
We confirm that we have not undertaken any non-audit services for the Council in
the year.
Fees for audit of Charitable Trusts
The audit fee in table above does not include the cost of auditing the Council’s
charitable trusts. Having substantially completed our work for the 2024/25 financial
year, we can confirm that our fee for the audit of these is £9,250 (2023/24 fees were
£9,000).
Services provided to other entities within the Council's group
In addition to auditing the Council’s charitable trusts, we are providing audit services
to the following entities in the Council’s group:
• Argyll and Bute Integration Joint Board (total fee of £34,000)
• Dunbartonshire and Argyll and Bute Valuation Joint Board (total fee of £10,000)
• Live Argyll (total fee TBC)
105

Page 106

Appendix E: Other communications
blank
Other
communication Response
Compliance with
Laws and
Regulations
We will obtain written representations from management that all known instances of non-compliance or suspected non-compliance with laws and
regulations whose effects should be considered when preparing financial statements have been disclosed.
External
confirmations We did not experience any issues with respect to obtaining external confirmations.
Related parties
We did not identify any significant matters relating to the audit of related parties.
We will obtain written representations from management confirming that:
a. they have disclosed to us the identity of related parties and all the related party relationships and transactions of which they are aware; and
b. they have appropriately accounted for and disclosed such relationships and transactions in accordance with the requirements of the applicable
financial reporting framework.
Going Concern
We have not identified any evidence to cause us to disagree with the Section 95 Officer that the Council will be a going concern, and therefore we have
not identified any evidence to cause us to consider that the use of the going concern assumption in preparation of the financial statements is not
appropriate.
We will obtain written representations from management, confirming that all relevant information covering a period of at least 12 months from the date of
approval of the financial statements has been taken into account in assessing the appropriateness of the going concern basis of preparation of the
financial statements.
106

Page 107

Appendix E: Other communications (continued)
blank
Other
communication Response
Subsequent events
We are required to obtain evidence about whether events occurring between the date of the financial statements and the date of the auditor’s report that
require adjustment of, or disclosure in, the financial statements are appropriately reflected in those financial statements in accordance with the
applicable financial reporting framework.
We will obtain written representations from management that all events occurring subsequent to the date of the financial statements and for which the
applicable financial reporting framework requires adjustment or disclosure have been adjusted or disclosed.
Matters related
to fraud
Our audit was designed to obtain reasonable assurance whether the financial statements as a whole are free from material misstatement due to fraud.
Please refer to the section titled ‘Fraud considerations’ for our fraud considerations and conclusion.
We will obtain written representations from management and, where appropriate, the Audit and Scrutiny Committee, confirming that
a. they acknowledge their responsibility for the design, implementation and maintenance of internal control to prevent and detect fraud;
b. they have disclosed to the auditor the results of management’s assessment of the risk that the financial statements may be materially misstated as a
result of fraud;
c. they have disclosed to the auditor their knowledge of fraud or suspected fraud affecting the entity involving:
i. management;
ii. employees who have significant roles in internal control; or
iii. others where the fraud could have a material effect on the financial statements; and
d. they have disclosed to the auditor their knowledge of any allegations of fraud, or suspected fraud, affecting the entity’s financial statements
communicated by employees, former employees, analysts, regulators or others.
107

Page 108

Appendix E: Other communications (continued)
blank
communication
System of Quality
Management
National Fraud
Initiative
Other Response
To address the requirements of ISQM (UK) 1, our firm’s System of Quality Management team completes, as part of an ongoing and iterative process, a
number of key steps to assess and conclude on our firm’s System of Quality Management, including:
• Ensuring there is an appropriate assignment of responsibilities under ISQM (UK) 1 and across Leadership
• Establishing and reviewing quality objectives each year, ensuring ISQM (UK) 1 objectives align with our firm's strategies and priorities
• Identifying, reviewing, and updating quality risks each quarter, taking into consideration a number of input sources (such as FRC / ICAEW review
findings, internal monitoring findings, findings from our firm’s root cause analysis and remediation functions, etc.)
• Identifying, designing, and implementing responses as part of the process to strengthen our firm's internal control environment and overall quality
• Evaluating responses and remediating control gaps or deficiencies
We perform an evaluation of our system of quality management on an annual basis. Our latest evaluation was performed as of 31 August 2024. Details
here
of that assessment and our conclusion are set out in our 2023/2024 Transparency Report, which is available on our website here.
The National Fraud Initiative (NFI) in Scotland is a counter-fraud exercise led by Audit Scotland and overseen by the UK’s Cabinet Office, designed to
prevent and detect fraud. The NFI uses data analytics to compare information held on individual by different public bodies to highlight the existence of
fraud or error.
The NFI exercise for 2024/25 has commenced, and data uploads have been submitted to the Cabinet Office for review. As at 16/11/2025 (per update
report taken to the Audit and Scrutiny Committee), 5,612 matches are complete (over 11 operational areas), and 5,532 have cleared, with 80 errors.
More uploads have been given to the Cabinet Office in November 2025 and will be matched once released.
108

Page 109

Appendix F: Wider Scope and Best Value ratings
We need to gather sufficient evidence to support our commentary on the Council’s arrangements and to identify and report on any risks. We will carry out more detailed work where we
identify significant risks. Where significant risks are identified we will report these to the Council and make recommendations for improvement. In addition to local risks, we consider
challenges that are impacting the public sector as a whole.
We have assigned priority rankings to each of the risks identified to reflect the importance that we consider each poses to your organisation and, hence, our recommendation in terms of the
urgency of required action. The table below describes the meaning behind each rating that we have awarded to each wider scope area based on the work we have performed.
Rating
Level 1
Description
The identified risk and/or significant deficiency is critical to the business
processes or the achievement of business strategic objectives. There is
potential for financial loss, damage to reputation or loss of information. The
recommendation should be taken into consideration by management
immediately.
Level 2 The identified risk and/or significant deficiency may impact on individual
objectives or business processes. The audited body should implement the
recommendation to strengthen internal controls or enhance business
efficiency. The recommendations should be actioned in the near future.
Level 3 The identified risk and/or significant deficiency is an area for improvement or
less significant. In our view, the audited body should action the
recommendation, but management do not need to prioritise.
109

Page 110

Appendix G: Current year updates, forthcoming accounting & other issues
Applicable for IFRS Reporters
Current and forthcoming accounting issues
New standards and amendments
Effective for accounting periods beginning on or after 1 January 2023
IFRS 17 Insurance Contracts (issued May 2017) and Amendments to IFRS 17
Insurance Contracts (Issued June 2020)
• IFRS 17 Insurance Contracts (IFRS 17) is a new standard that will replace IFRS 4
Insurance Contracts (IFRS 4). The standard sets out the principles for the recognition,
measurement, presentation and disclosure about insurance contracts issued, and
reinsurance contracts held, by entities. The amendments, issued subsequently in June
2020, do not change the fundamental principles of IFRS 17 and are aimed at helping
companies implement the standard and make it easier for them to explain their financial
performance. The EU has endorsed the adoption of IFRS 17, although with some
changes to the version issued by the IASB. In May 2022, the UK Endorsement Board
(UKEB) adopted the standard and the associated amendments.
Amendments to IFRS 17 Insurance Contracts: Initial Application of IFRS 17 and IFRS
9 (Issued December 2021)
• The amendments address potential mismatches between the measurement of financial
assets and insurance liabilities in the comparative period because of different
transitional requirements in IFRS 9 Financial Instruments (IFRS 9) and IFRS 17. The
amendments introduce a classification overlay under which a financial asset is permitted
to be presented in the comparative period as if the classification and measurement
requirements of IFRS 9 had been applied to that financial asset in the comparative
period. The classification overlay can be applied on an instrument-by-instrument basis.
The amendments have been UK-adopted and endorsed by the EU.
Amendments to IAS 1 Presentation of Financial Statements and IFRS Practice
Statement 2 Making Materiality Judgements: Disclosure of Accounting Policies
(Issued February 2021)
• The amendments set out notable new requirements for accounting policy disclosures
that change the requirements for entities to disclose material accounting policy
information, rather than significant accounting policies, and not to disclose immaterial
accounting policy information, explaining that accounting policy information taken in
isolation is unlikely to be material, but it is when the information is considered together
with other information in the financial statements that may make it material. Earlier
application is permitted. The amendments have been UK-adopted and endorsed by the
EU.
Amendments to IAS 8 Accounting Policies, Changes in Accounting Estimates and
Errors: Definition of Accounting Estimates (Issued February 2021)
• The amendment introduces a new definition for accounting estimates and clarifies how
entities should distinguish changes in accounting policies from changes in accounting
estimates. The distinction is important because changes in accounting estimates are
applied prospectively only to future transactions and other future events, but changes in
accounting policies are generally applied retrospectively to past transactions and other
past events. Earlier application is permitted. The amendments have been UK-adopted
and endorsed by the EU.
110

Page 111

Appendix G: Current year updates, forthcoming accounting & other issues (continued)
Applicable for IFRS Reporters
Current and forthcoming accounting issues (continued)
New standards and amendments (continued)
Effective for accounting periods beginning on or after 1 January 2023
IFRS 18 Presentation and Disclosure in Financial Statements (Issued April 2024)
• IFRS 18 Presentation and Disclosure in Financial Statements (IFRS 18) is a new
standard that replaces IAS 1 Presentation of Financial Statements. The new standard
aims to increase the comparability, transparency and usefulness of information about
companies’ financial performance. It introduces three key new requirements focusing on
the presentation of information in the statement of profit or loss and enhancing certain
guidance on disclosures within the financial statements.
111

Page 112

Appendix G: Current year updates, forthcoming accounting & other issues (continued)
International Standard on Auditing (UK) 600 Revised - Special considerations - Audits of group financial statements (Including the work of component
auditors)
ISA (UK) 600 deals with the special considerations that apply to audits of group financial statements, including those circumstances when component auditors are involved. The auditing
standard has been revised. The revised standard is effective for audits of group financial statements for periods beginning on or after 15 December 2023. The revisions made to ISA (UK)
600 impact how we perform audits of group financial statements, and how we communicate our audit strategy and audit findings arising from audits of group financial statements, going
forward. This page sets out the key changes made to ISA (UK) 600 and how Forvis Mazars will apply the requirements of the revised standard in practice.
Key changes
The previous ISA (UK) 600 included prescriptive requirements in respect of the audit procedures required over ‘significant components’ of a group, i.e., a ‘full scope’ audit of a significant
component’s financial information relevant to the group financial statements was required. Forvis Mazars defined a ‘significant component’ as one that contributed to the group financial
statements more than 15% of the materiality benchmark selected to determine group materiality, e.g., if we had determined materiality using a profit before tax benchmark, any
component that contributed more than 15% of the group’s reported profit before tax would be classified as a significant component and a ‘full scope’ audit would be performed over that
component’s financial information.
ISA (UK) 600 Revised eliminates the 'significant component' concept, opting instead for consideration of risks of material misstatement at the assertion level of the group financial
statements that are associated with components. This results in a group audit that is better focused on the risks of material misstatement of the group financial statements and affords
greater flexibility in how we classify components and how we may design the nature and extent of audit procedures to be performed over a component’s financial information, i.e., we can
determine the nature and extent of the audit procedures to be performed over a component’s financial information based on the specific risks relevant to the group financial statements.
ISA (UK) 600 also, however, removed the option to limit the procedures performed over a ‘non-significant’ component’s financial information to desktop analytical procedures. We are
now required to perform substantive audit procedures (or a combination of substantive audit procedures and tests of controls) over the group financial statements, including the financial
information relating to components in the group, until the residual, untested balances, classes of transaction and disclosures in the group financial statements are below our group
materiality. This is to ensure that aggregation risk (the probability that the aggregate of uncorrected and undetected misstatements exceeds materiality for the financial statements as a
whole) is addressed appropriately.
In combination, these changes may result in a change to the nature and extent of the audit procedures we perform over the financial information of components on a group audit
compared to previous years and may result in components that were not previously in scope of our group audit being brought into scope going forward to ensure that we address
aggregation risk appropriately.
112

Page 113

-
Appendix G: Current year updates, forthcoming accounting & other issues (continued)
International Standard on Auditing (UK) 600 Revised - Special considerations - Audits of group financial statements (including the work of component
auditors)
Key changes (continued)
To ensure consistency of approach, Forvis Mazars will apply the definitions set out below when performing audits of group financial statements going forward:
Key component Material component
Any component: Any component, other than a key A component, that is not a key
component, that contributes to one or component or a material component,
i. Which is greater or equal to 15% of more group financial statement areas that is scoped into a group audit to
the benchmark chosen for calculating an amount that is above group financial reduce the risk of material misstatement
group materiality (key by size); or statement materiality. of the group financial statements to an
acceptably low level (based on size or
ii.Where the specific nature or risk) in situations when, after assessing
circumstance of its financial which components are key components
information make it likely to include and material components, the
significant risks of misstatement of the aggregate amount of a financial
group financial statements (key by statement area related to un-scoped
risk). components is still above group
financial statement materiality.
Non material component
113

Page 114

Appendix G: Current year updates, forthcoming accounting & other issues (continued)
International Standard on Auditing (UK) Revised - Special considerations - Audits of group financial statements (including the work of component auditors)
Key changes (continued)
Definition of ‘component’ - The definition of ‘component’ has been revised to “an entity,
business unit, function or business activity, or some combination thereof, determined by the
group auditor for the purposes of planning and performing audit procedures in a group
audit”.
This provides clarity on how components may be identified in a group audit and may result
in a change to how we identify components on a group audit compared to previous years.
For example, we may group separate legal entities (e.g., subsidiaries) in a group based on
common characteristics (such as common management, common information systems, and
common geographical locations) and treat those components as a single component, when
appropriate to do so.
Common controls - The definition of ‘group-wide’ controls has been removed and we are
instead required to consider ‘common controls’, being controls that operate in a common
manner for multiple entities or business units.
This may assist us in grouping separate legal entities, business units, functions, or business
activities in a group into a single component for the purposes of a group audit; or it may
result in us grouping specific account balances or classes of transaction recorded by
individual legal entities, business units, functions, or business activities into a single
population for the purposes of our audit procedures.
For audits where we are adopting a controls-based audit strategy, this may result in
efficiencies, as we can rely on a single control for the purposes of the audits of more than
one component where that control is common to those components.
Definition of ‘engagement team’ - The definition of ‘engagement team’ has been revised
to include component auditors. While this change may seem inconsequential, it forms part
of the overall changes intended by ISA (UK) 600 Revised to enhance two-way
communication between the group auditor and component auditors during a group audit.
This will result in enhanced direction and supervision of component auditors by the group
auditor during a group audit.
Calculation of component materiality - The requirement to set overall materiality for a
component has been removed. We are now only required to determine component
performance materiality.
Other changes - ISA (UK) 600 Revised includes new and revised requirements and
application material that better aligns the standard with recently revised standards such
as ISQM (UK) 1, ISA (UK) 220, and ISA (UK) 315. The new and revised requirements
also strengthen our responsibilities related to professional scepticism, planning and
performing a group audit, two-way communications between the group auditor and
component auditors, and audit documentation. These changes are to encourage
proactive management of quality at the group engagement level and the component
level; reinforce the need for robust communication and interactions during a group audit;
and foster an appropriately independent and challenging sceptical mindset.
Scope of audit work to be performed over a component’s financial information -
Forvis Mazars will, going forward, determine the scope of work to be performed over a
component’s financial information on a group audit using the definitions set out below:
Full scope Specific scope
Group Engagement
Team Instructed
Procedures
Designing and performing
audit procedures on the
entire financial information
of a component.
Designing and performing
audit procedures on one
or more specified account
balances, classes of
transaction, and/ or
disclosures of a
component.
Performing specified audit
procedures, as designed
and instructed by the
group engagement team.
114

Page 115

Contact
Forvis Mazars
Mark Outterside
Director – Public Sector Audit
Tel: 07824 086 593
mark.outterside@mazars.co.uk
The contents of this document are confidential and not for distribution to anyone other than the recipients.
Disclosure to third parties cannot be made without the prior written consent of Forvis Mazars LLP.
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is
a limited liability partnership registered in England and Wales with registered number OC308299 and with its registered office at
30 Old Bailey, London, EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered Accountants in
www.auditregister.org.uk
England and Wales. Details about our audit registration can be viewed at www.auditregister.org.uk under reference number
C001139861. VAT number: GB 839 8356 73
© Forvis Mazars 2024. All rights reserved.