Annual Assurance
and Risks Report
A review of 2024/25 local government audits in
Scotland
Prepared by Audit Scotland
March 2026

Page 2

2Annual Assurance and Risks Report
Contents
Introduction 3
Part 1. 2024/25 council and IJB audits 5
Part 2. Assurance arrangements 13
Appendix 1 17
Appendix 2 19
Accessibility
You can find out more and read this report using assistive
technology on our website www.audit.scot/accessibility.
Audit team
The core audit team
consisted of:
Emma Brown, Jack
Nixon, Liam Prior,
and Kathrine Sibbald,
under the direction of
Blyth Deans.

Page 3

3Introduction
Introduction
1. The Annual Assurance and Risks Report is an annual report by the
Controller of Audit to the Accounts Commission, made public for the
first time since 2021. It brings together a wealth of evidence from annual
audit reporting.
2. This report highlights recurring themes across our 2024/25 audits,
helping support individual bodies and the wider sector plan and deliver
improvements. Alongside wider audit intelligence, it also helps inform the
Accounts Commission’s selection of a Best Value theme for 2026/27.
Previous themes covered how councils are responding to workforce
challenges, why leadership matters and a report on how councils are
redesigning and delivering more efficient services will be published in
spring/summer 2026.
Context
3. The Accounts Commission continues to highlight the significant
financial challenges across local government in Scotland. The cost
of delivering services continues to rise, the cost of servicing debt is
increasing, reserve levels are falling and there’s continued reliance on
non-recurring measures to close significant and growing budget gaps.
4. The Local government in Scotland: Financial bulletin 2024/25
provides a detailed analysis of councils’ financial performance in 2024/25.
The accompanying budget supplement highlights these challenges will
continue despite a real terms funding increase in the 2026/27 budget
with a projected fall in funding from the Scottish Government in 2028/29.
We will report on this further in June 2026.
5. The annual audit of local government bodies provides independent
assurance on how well public money is being spent, ensuring it is
properly accounted for, used for the intended purposes, and delivers
positive outcomes for communities. While the value of an unmodified (or
‘clean’) audit opinion can’t be underestimated, our annual audit reports
also contain a wealth of information and recommendations to support
public bodies to continue to improve.
What we found
6. In their annual audit reports, auditors highlighted that unaudited
accounts are prepared to a good standard. Some councils, however, are
struggling to meet statutory deadlines, with some challenges in meeting
agreed audit timeframes. These delays have an impact on accountability

Page 4

Introduction 4
and reporting of risks. This is an area we will continue to monitor,
ensuring auditors and audited bodies continue to work collaboratively to
secure timely, high-quality audit delivery.
7. Auditors continued to raise significant concerns about the financial
sustainability of councils and Integration Joint Boards (IJBs), reporting
that councils and IJBs are overspending because of wider financial
pressures. While in some cases auditors reported room for improvement
in financial management, the overall sense is that poor financial
management is not the cause of the financial sustainability challenge.
There is an urgent need for a radical shift in how services are delivered. 
8. This shift will need to be underpinned by stable leadership, robust
workforce management and digital tools that support effective delivery.
The Accounts Commission has reported for some years that there is
ongoing instability and change in senior leadership across IJBs. This has
the potential to disrupt the longer-term strategic planning vital for change.
9. Where councils are undertaking workforce restructuring, auditors
recommended business cases, transparency and elected member
scrutiny could have been clearer.
10. Auditors also reported that IT assurance remains a recurring risk
across councils, with many relying heavily on externally-hosted systems,
but without formal assurance from third party providers. Councils must
review and strengthen these arrangements.
11. As planning for the 2025/26 annual audit gets under way, the overall
operating context remains challenging. Auditors will continue to keep the
issues highlighted in this report under review as part of their upcoming
audit work.
Structure of the Annual Assurance and Risks Report
12. The report covers the following:
• Part 1 provides an overview of audit delivery and highlights the key
risks raised in 2024/25 annual audit reports for councils and IJBs. It
pulls out key messages from financial audit work to support wider
reflection and learning. A comprehensive analysis of the nature and
impact of auditors’ recommendations will be available in our annual
impact report, later in 2026.
• Part 2 sets out the processes in place to identify emerging risks
and address these through timely and high-quality audit work.
• More information on relevant recent publications can be found in
the appendices to this report.
The Accounts
Commission is an
independent public
body appointed by
Scottish ministers to
hold local government
to account. The
Controller of Audit
is an independent
post established by
statute, with powers
to report directly to
the Commission
on the audit of local
government.
To find out more
about the role of the
Controller of Audit
and the Accounts
Commission go to our
website: Our people
– Audit Scotland
and Accounts
Commission – Audit
Scotland.

Page 5

5Part 1. 2024/25 council and IJB audits
Part 1. 2024/25 council and 
IJB audits
Local and national audits have identified several risk areas
which auditors will keep under review
13. The results of the range of audit work undertaken in 2024/25 highlight
significant strategic areas of concern. The Commission, auditors and the
local government sector may find this useful when reflecting on upcoming
audit work, priorities and risks.
More annual audit reports were issued by the target
date in 2025 following collaboration between councils
and IJBs and their auditors, but some audits continue
to be delayed
14. The Commission set a target completion date of 30 September 2025 for
annual audit reports in the local government sector. Out of 32 councils and
30 IJBs:
• Fifteen councils and 17 IJBs met this deadline (compared to ten
councils and 14 IJBs in 2024).
• Five councils and seven IJBs did not meet this deadline, but
annual audit reports were submitted by January 2026 in time for
consideration in this report.
• Annual audit reports for 12 councils and six IJBs were outstanding at
the time of drafting this report in January 2026.
15. Under the Local Authority Accounts (Scotland) Regulations 2014, 
councils must publish a notice on their website by 17 June setting out their
intention to display their unaudited accounts for public inspection and when
and where they will be available. Twenty-eight councils met this deadline 
in 2025.
16. Four councils (Aberdeenshire, Clackmannanshire, East Dunbartonshire
and Stirling) failed to meet the deadline to make available their unaudited
accounts for public inspection by 1 July.
17. Financial reporting cycles were extended due to Covid-19, and auditors
and audited bodies are now making efforts to return to pre-Covid reporting
timelines. Auditors and the Controller of Audit have reported on the
timeliness of audit delivery, while encouraging audited bodies and auditors
to work collaboratively to secure timely, high-quality audit delivery.

Page 6

Part 1. 2024/25 council and IJB audits 6
18. Delays in reporting and audit sign-off may impact accountability and
reporting of risks. Audit Scotland continues to take steps to promote timely
delivery from auditors, while emphasising that audit quality must not be
compromised. The Controller of Audit can publish Section 102 reports
where councils have had continuing challenges in enabling timely 
audit delivery.
Councils and IJBs generally have sufficient skills
and capacity within their finance teams and provide
unaudited accounts to a good standard
19. Overall, council finance teams are led by suitably qualified and
experienced staff, with several auditors noting sufficient skills, capacity and
capability within the core finance team and good support for the audit.
20. Likewise, IJB auditors did not generally highlight issues around finance
team capacity or capability (outwith concerns raised around turnover of
senior financial officers which are detailed in paragraphs 55–58). While
the auditors of both Aberdeenshire and Moray IJBs did note risks around
finance team capacity, auditors reported staff were suitably capable 
and qualified.
21. Of the 44 council and IJB annual audit reports reviewed, 42 noted
receipt of the unaudited accounts being on time, though seven noted some
missing information or supporting papers. The remaining two annual audit
reports did not comment on the timeliness of the accounts.
22. Where auditors commented on the quality of unaudited accounts, 
it was usually to note that they were of a reasonable standard. 
Auditors also generally concluded that councils have appropriate 
financial scrutiny arrangements.
23. The majority of councils we reviewed required material audit
adjustments. These were for a variety of issues with the most common
being valuation of Property, Plant and Equipment. Auditors also reported
adjustments relating to IFRS 16 (paragraphs 33–35) and pensions
treatment at multiple councils. These are complex areas of the accounts
where material adjustments are more likely.
24. The majority of IJBs did not require material audit adjustments.
Annual audit plans and reports highlight the key risks
facing councils
25. Our review of annual audit plans and annual audit reports identified
a range of risks across councils, which we have summarised below. As
outlined in paragraph 14, audit delays for some councils mean that this
report draws upon the findings from 29 annual audit plans and 20 annual
audit reports (out of 32 councils in total).
Section 102 of the
Local Government
(Scotland) Act 1973
sets out arrangements
for the Controller
of Audit’s reporting
to the Accounts
Commission. This
includes reporting on
matters arising from
the accounts, or from
the audit of those
accounts.

Page 7

Part 1. 2024/25 council and IJB audits 7
Financial sustainability
26. All councils reviewed have medium-term financial plans, consistently
forecasting significant budget gaps. This is within a context of inflationary
pressures and high demand in certain service areas. Councils continued to
take a range of measures to address budget gaps in 2024/25, with savings
and use of reserves being the most significant across the sector.
27. Though auditors recognised the significant recurring savings delivered
by councils, several flagged the use of unsustainable ‘one-off’ measures,
such as reserves and non-recurring savings, to balance the budget (see
Local government in Scotland: Financial bulletin 2024/25 for more detail
on this). Some auditors also flagged risks around the deliverability of
further savings.
28. The Local government in Scotland: Financial bulletin 2024/25 reflected
auditors’ findings on reserves use, highlighting a decrease in usable
reserves in 2024/25, a high proportion of reserves being committed for
specific purposes, and a number of councils being in breach of their own
reserves policies. It also noted a £1.2 billion increase in long-term external
borrowing since the prior year, primarily to fund investment in assets. The
report warned that councils face substantial challenges to maintain financial
sustainability over the medium term.
Financial management
29. Almost all auditors found that councils had effective (or largely effective)
arrangements in place for financial management, noting established 
budget setting and monitoring processes with clear, regular reporting to
elected members.
30. Despite this, more than a third of councils overspent against their
general fund revenue budget in 2024/25. The Local government in Scotland:
Financial bulletin 2024/25 highlighted inflation and increasing demand as
factors driving overspends in a range of areas, including adult social care 
and education.
31. Capital expenditure was an exception, with a trend of underspends
against budget. Auditors highlighted capacity and supply chain issues as
contributing factors. Auditors will report on these issues through their
2025/26 local Best Value thematic work on asset management.
32. As noted in paragraph 27, councils delivered significant savings as
part of measures aimed to close budget gaps, but reporting on savings at
council level is mixed. The Local government in Scotland: Financial bulletin
2024/25 highlighted the need for improved clarity and comprehensiveness
around savings performance in management commentaries.
IFRS 16 implementation
33. The International Financial Reporting Standard 16: Leases (IFRS 16),
issued in January 2016, came into effect for local government bodies from

Page 8

Part 1. 2024/25 council and IJB audits 8
2024/25. It is a complex accounting standard with significant accounting
impacts. Many councils used external advisors to support implementation.
34. Overall, the conclusion from 2024/25 audit work reported to date is that
councils appropriately reflected the impact of IFRS 16 in their final accounts.
However, there was scope for a smoother implementation process given
the years available for councils to prepare.
35. Five councils had missing information (either financial or disclosures) in
relation to this in their draft accounts presented for audit. Delays in receiving
information from external advisors were often noted. In addition, auditors
identified widespread errors, though in all cases these were either corrected
or not material to the accounts.
Equal pay claims
36. Equal pay claims are creating ongoing financial uncertainty for some
councils, with several recognising provisions or contingent liabilities. No
widespread new settlements or major cash impacts were reported in
2024/25. Where issues were identified, audit attention focused on correct
accounting treatment and disclosure.
37. Overall, equal pay claims do not represent a significant new financial
risk for most councils but continue to require ongoing monitoring and
transparent reporting.
Contract management
38. Across most councils, auditors reported no significant risks in relation to
contract management, though there were isolated project-specific issues in
a small number of councils. Highlighted risks focused on contract delivery
issues with large capital projects, resulting in increased costs and the
requirement to strengthen procurement governance.
Elected member behaviour
39. Auditors reported concerns about elected member behaviour at a small
number of councils. Issues included a lack of cross-party collaboration,
tensions with officers, and, on occasion, unprofessional behaviour.
40. Elsewhere, auditors pointed to robust elected member scrutiny and
constructive relationships between political parties and between members
and officers, as well as highlighting the importance of collaborative 
decision-making.
Workforce restructuring
41. Some councils have implemented reductions in senior management
structures or broader organisational restructures in light of ongoing financial
pressures. This has included the use of voluntary severance and early
retirement schemes to reduce staffing costs and reshape capacity.

Page 9

Part 1. 2024/25 council and IJB audits 9
42. Governance and oversight of restructuring and exit decisions remains
critical to ensure required savings are delivered. Auditors emphasise the
need for clear business cases, transparency, and elected member scrutiny.
43. Exit packages represent a significant cost for some councils. This is
primarily driven by voluntary severance and early retirement schemes. For
example, North Ayrshire and Dundee City Councils have used or plan to use
voluntary severance and early retirement schemes in 2024/25 and 2025/26,
generating recurring savings of £2.5 and £1.2 million respectively.
44. Auditors highlighted scope for greater scrutiny and transparency
around the exit of senior officers in the 2024/25 audits of North
Lanarkshire and Perth and Kinross councils respectively and in a Section
102 report on Glasgow City Council (published in August 2025 following
the 2023/24 annual audit). Perth and Kinross Council noted that its
normal process would involve elected member approval (where possible),
while North Lanarkshire and Glasgow City Councils committed to actions
to strengthen arrangements.
System updates
45. Many councils are undergoing major system replacements or
implementations in areas such as HR, payroll and finance, with a 
move to externally-hosted or cloud-based systems. These are often
complex projects with an important role in business continuity, resilience,
and transformation.
46. Auditors at Highland and South Lanarkshire Councils reported
successful implementation of new systems with appropriate governance
and assurance arrangements in place. Elsewhere, auditors reported
delays, partial system go-lives, or gaps in post-implementation review and
assurance. Such issues can have operational impacts and reduce officers’
capacity for other priorities.
Assurance over third-party systems
47. Auditors reported that IT assurance remains a recurring risk across
councils, with many relying heavily on externally-hosted finance, HR, 
payroll and procurement systems but not receiving formal assurance 
reports from third-party providers. This may increase the risk of data
compromise or loss and insufficient resilience. This has led some auditors
to raise recommendations that councils review and strengthen current
assurance arrangements.
48. Auditors consider cybersecurity arrangements more broadly as part of
annual audit work. A recent Section 102 report on a significant cyber-attack
on Comhairle nan Eilean Siar shared learning for the sector.

Page 10

Part 1. 2024/25 council and IJB audits 10
IJBs face significant challenges around financial
sustainability
49. Our review of annual audit plans and annual audit reports identified a
range of risks across IJBs, with financial sustainability consistently raised as
an area of significant challenge. As outlined in paragraph 14, audit delays
for some IJBs mean this report draws on findings from 28 annual audit
plans and 24 annual audit reports (out of 30 IJBs in total).
Financial sustainability
50. Auditors consistently flagged acute risks to financial sustainability,
highlighting budget gaps, depleted reserves, and overspends. IJBs often
bridged budget gaps through one-off measures such as use of reserves 
or unplanned partner contributions.
51. This has caused an overall reduction in reserves across the sector: two
IJBs (Aberdeenshire and Aberdeen City) have utilised all their reserves and
a further 12 have utilised all contingency reserves. Meanwhile, unplanned
partner contributions have knock-on effects on the financial sustainability of
councils and NHS boards.
52. The recent IJB financial bulletin 2024/25 sets out more detail on the
financial challenges faced by IJBs.
Financial management
53. Though specific areas for improvement were identified at some IJBs,
auditors broadly found financial management arrangements to be effective.
Overspends were widespread across the sector, but auditors tended to
attribute the level of spend to wider issues rather than to ineffective financial
management. The IJB financial bulletin 2024/25 highlighted that IJBs must
work closely with partners to ensure budgets and savings plans are realistic.
54. Overall, IJBs delivered 78 per cent of planned savings in 2024/25.
However, auditors noted risks around the deliverability of recurring measures
at the scale required to meet budget gaps moving forwards. The IJB
financial bulletin 2024/25 highlighted that IJBs need to be more transparent
on what proportion of savings are recurring.
Senior leadership turnover
55. Auditors reported high turnover across IJB senior leadership, with
over half of IJBs experiencing a change at chief financial officer or chief
officer level in 2024/25. This frequently led to interim appointments while a
permanent replacement was sought.
56. Clackmannanshire and Stirling IJB was without a chief financial officer
for two months in late 2025, during which time it did not meet its statutory
duty for ensuring proper financial administration. Further detail will be
provided in a forthcoming Section 102 report, due for publication in 
March 2026.

Page 11

Part 1. 2024/25 council and IJB audits 11
57. The auditors of Scottish Borders IJB also highlighted that the chief
officer resigned in April 2025 and a successor had still to be appointed as of
September 2025, noting an urgent need to fill the role. Similarly, the Cùram
Is Slàinte nan Eilean Siar (Western Isles IJB) Chief Officer resigned in July
2025 and left his post in early October 2025. Applications for an Interim
Chief Officer were invited in late September, with an appointment made in
early November. In their 2023/24 annual audit report, auditors reported that
there was a lack of clarity over who was fulfilling key responsibilities over
the interim period.
58. Auditors emphasised the risk that instability in leadership teams can
disrupt strategic planning to address the challenges faced by IJBs.
Workforce restructuring
59. Auditors noted that IJBs face challenges around workforce capacity. 
In some cases, they noted an appetite to shift away from the use of 
agency workers, but in some locations, local workforce demographics 
make this very challenging. Meanwhile, some IJBs are using vacancy
management and/or wider restructures to reduce staffing costs in 
response to financial challenges.
60. The IJB financial bulletin 2024/25 noted ongoing recruitment challenges
and staff vacancies across the sector as factors likely contributing to the
general decline in performance and satisfaction across the health and social
care sector.
System updates and IT assurance arrangements
61. IJBs rely on partner body systems at councils and NHS boards, with no
standalone HR, payroll or finance systems in operation. Most auditors were
satisfied with IJBs’ IT assurance arrangements.
62. Some auditors raised concerns around reliance on legacy care systems
that are now considered not fit for purpose, increasing the risk of IT
application failure, data quality issues and cyber-attacks. Projects to replace
legacy systems are under way but have long timescales and are often
affected by delays.
Best Value reporting highlighted a range of national
and local issues
63. The Delivering for the future: Responding to the workforce
challenge Best Value national thematic report (published in August 
2025) drew together findings from 2023/24 local Best Value reporting 
on workforce. It highlighted that councils urgently need to make 
progress with workforce plans if they are to protect services and 
ensure financial sustainability.
64. Under the integrated approach to Best Value set out in paragraph
85, 2024/25 council audits included thematic reports on transformation.

Page 12

Part 1. 2024/25 council and IJB audits 12
Twenty such reports have been published at the time of drafting this report
in January 2026. The upcoming Best Value national thematic report on
transformation (publishing in May 2026) will draw together local findings.
65. Since February 2025 the Controller of Audit has published seven
Section 102 Best Value reports, as detailed in Appendix 2. These
highlighted the financial sustainability risks facing councils, with IJBs often
a contributing factor. The Commission emphasised the importance of
progressing transformation plans in light of budget gaps, and the need for
open and meaningful engagement with communities when taking the
difficult decisions required to balance budgets.
Conclusion
66. The local government sector continues to face significant pressures
from rising demands, which are driving continued financial challenges
across councils and IJBs. As levels of IJB reserves fall, IJBs will 
become increasingly reliant on partner contributions, which will impact
council finances.
67. Most auditors reported sound financial management overall, which will
be important as bodies respond to the challenges ahead. Councils and IJBs
have delivered substantial savings, but a step change is required to achieve
longer-term financial sustainability.
68. For IJBs, high levels of senior leadership turnover continue to present a
risk to achieving the scale of change required. Meanwhile, some councils
and IJBs have restructured senior management or the wider workforce in
order to make savings.
69. The sustained and recurring pressures facing councils and IJBs must
be addressed to secure financial sustainability in the medium term. Decisive
action and difficult decisions about services will be required. Auditors will
continue to keep this, and the issues highlighted in this report, under review
as part of their upcoming 2025/26 annual audits.

Page 13

13Part 2. Assurance arrangements
Part 2. Assurance
arrangements
Existing processes and engagement activities identify risks
and provide assurance to the Commission
70. This section covers the arrangements in place to assure the
Commission that the audit work undertaken on its behalf is informed by
the emerging risks across the sector. It also sets out the arrangements
for monitoring and reporting on audit delivery and quality.
The Code of Audit Practice includes significant wider-
scope elements.
71. The Code of Audit Practice (June 2021) (‘the Code’) defines the
independent audit of public bodies in Scotland. All auditors appointed
by the Auditor General and the Accounts Commission are required
to comply with the Code. It sets out the responsibilities of appointed
auditors, alongside the independent role of the Controller of Audit to
report to the Commission.
72. Reflecting the fact that public money is involved, public audit is
undertaken from a wider perspective. This includes consideration
of: financial management; financial sustainability; vision, leadership
and governance; and use of resources to improve outcomes. In
local government, public audit also assesses arrangements for, and
performance of, the audited body’s duties for Best Value and 
community planning.
73. Under the approach adopted for the current five-year audit
appointments, auditors integrate their assessment of these areas with
the annual audit, taking a risk-based approach.
Robust arrangements are in place to support audit
delivery and quality
74. The Audit Quality Framework sets out the overall approach to
measuring high-quality public audit by all appointed auditors. It gives
the Commission robust, objective and independent assurance over the
quality of audit work carried out on its behalf. The current framework has
been in place since November 2024 and there are plans to review and
revise the framework ahead of the next five-year audit appointment from
2027/28.

Page 14

Part 2. Assurance arrangements 14
75. To support audit quality, Audit Scotland issues annual guidance to all
appointed auditors, incorporating wider scope requirements. In addition, a
programme of audit quality reviews (both internal and external) is in place,
with auditors supported to learn from findings. Monitoring arrangements
allow oversight of compliance with ethical standards, quality standards,
achievement of target dates, and stakeholder survey responses.
76. Each year, Audit Scotland publishes an annual report on the quality of
public audit in Scotland. The report due to be published in June 2026 will
set out progress against the Audit Quality Indicators set within the Audit
Quality Framework for the 2024/25 audit year.
77. Audit Scotland also monitors whether audits are being delivered 
to target completion dates and planned timetables. This monitoring 
forms the basis of regular updates to the Commission by the Controller
of Audit.
78. In February 2026, the Commission published a Response
Framework, which includes an escalation process for use where audit
delivery concerns are highlighted by the auditor or the audited body. It
emphasises the need for a partnership approach to be taken, with a clear
focus on addressing delays as early as possible.
Statutory Performance Information (SPI) Directions
and the Local Government Benchmarking Framework
(LGBF) allow auditors to assess how councils are
performing
79. The Commission directs councils to publish specific information on
their performance through SPI Directions.
80. As part of annual audit work, auditors evaluate the effectiveness and
appropriateness of performance management arrangements at each
council, and conclude on compliance with the SPI Direction. All annual
audit reports available at the time of drafting this report concluded that
councils were compliant.
81. A revised SPI Direction will apply from the financial year 2025/26
onwards. This sets clear expectations that councils will use the 
Local Government Benchmarking Framework (LGBF) to report
performance against their priorities over time and to draw comparisons
with similar councils.
82. The LGBF itself is designed to support councils to scrutinise their
services through measurable and comparable data. This is intended
to support service improvement and effective targeting of resources.
LGBF data is regularly considered by the Commission and through audit
intelligence to inform reporting.

Page 15

Part 2. Assurance arrangements 15
Audit work is informed by ongoing stakeholder
engagement
83. Throughout the year, the Controller of Audit and auditors engage
regularly with representatives from the local government sector. This
informs audit work, while also providing a valuable opportunity to share
key insights and consult on current issues.
84. A six-monthly intelligence report to the Commission highlights issues
raised in correspondence to Audit Scotland or reported by other public
sector oversight bodies.
Annual audit reporting ensures that the Commission
is well informed about the challenges faced by
individual councils
85. Reporting to the Commission on Best Value is fully integrated into
annual financial audit work. Auditors present a Best Value report on
a prescribed theme to each council annually, as well as reporting on
aspects of Best Value within annual audit reports.
86. At a sector level, findings from local Best Value thematic reports are
drawn together into an annual national report. At an individual council
level, findings on Best Value over the course of the audit appointment are
brought together in Section 102 Best Value reports.
87. The Controller of Audit also prepares Section 102 reports on matters
arising from the audit of local government accounts. These report on
specific concerns identified by auditors at individual councils or IJBs.
88. This suite of work provides an ongoing assessment of individual
councils’ achievement in embedding Best Value and continuous
improvement, as well as more detailed assessment of the risks being
faced by councils, both individually and as a sector. For further details on
recent publications, see Appendix 1 and 2.
Local government overview reporting plays an
important role in highlighting areas of interest and
concern
89. Local government overview reporting comprises two core 
annual outputs:
• Local government financial bulletin – covering the financial
performance and position of Scotland’s councils.
• Local government budgets – covering budgetary issues at a
national and local level.

Page 16

Part 2. Assurance arrangements 16
90. In 2024/25, the Commission’s overview reporting also included a
performance spotlight. This looked at the delivery and performance of
councils’ culture and leisure services.
91. In addition, a separate financial bulletin sets out the financial
performance of IJBs.
92. To inform overview reporting, auditors consult an independent
advisory panel drawn from across the sector. In addition, for each
national audit output, two Accounts Commission members bring
additional perspectives and insights as well as constructive challenge,
based on their experience and expertise.
93. Sector overview reports distil findings from annual audit work, Best
Value reporting and sectoral engagement to allow the Commission to
make recommendations and set expectations for the sector. They 
allow the Commission to ensure that the challenges councils face are
well understood.
94. These reports are supplemented by a range of performance 
audits and briefings on specific topics. A summary of key findings 
from overview reporting and wider performance audit work is included 
in Appendix 1.

Page 17

17Appendix 1
Appendix 1
The Accounts Commission published the following local government
sector overview reports during 2025/26:
• Local government budgets 2025/26 (May 2025) – Councils
continue to face financial pressures in excess of funding uplifts,
despite making a broad range of recurring savings. The report
highlighted the need for greater transparency and accessibility of
budget information to facilitate community engagement in decisions
to address financial challenges.
• Local government performance: Spotlight on culture and
leisure services (October 2025) – Funding for culture and leisure
services fell by three per cent in real terms between 2018/19 and
2023/24, with an increasing reliance on charging service users.
The report highlighted that, in order to support informed budgetary
decisions, councils need to strengthen their understanding of how
these services contribute to improved outcomes.
• Local government in Scotland: Financial bulletin 2024/25
(January 2026) – The report warned that there are signs that
councils will become financially unsustainable over the medium
term if sustained and recurring cost pressures are not addressed.
• Integration Joint Board Financial Bulletin 2024/25 (February
2026) – IJBs are facing increasing cost pressures and with total
reserves now lower than the forecast budget gap, difficult decisions
need to be made about how services are delivered, who is eligible
for services, and where to reduce or discontinue services.
The Accounts Commission published the following national performance
audits in partnership with the Auditor General in 2025/26:
• Flooding in communities: Moving towards flood resilience
(August 2025) – While there are positive examples of public bodies
and councils collaborating effectively to tackle flooding, gaps
remain in leadership, data, resources, skills and capacity. Auditors
highlighted the need for clarity over roles and responsibilities,
timelines, and delivery and funding mechanisms, as well as the
importance of having enough people with the right skills and
experience to support councils to tackle flooding.
• Improving care experience: Delivering The Promise (October
2025) – The Promise is a commitment to improve Scotland’s ‘care
system’. Plans have been slow to come together after insufficient
early delivery planning by the Scottish Government and COSLA.

Page 18

Appendix 1 18
• Community health and social care: Performance 2025 (January
2026) – There is a lack of comprehensive and consistent national
performance information about community health and social care
demand, workload, quality of care and outcomes. This makes it
difficult to fully assess performance and progress, but from the
available data there is a long-term picture of declining performance
and satisfaction.
• Delayed discharges: A symptom of the challenges facing
health and social care (January 2026) – Delayed discharges
(when someone remains in hospital despite being medically ready
to leave) are well above pre-pandemic levels. This is symptomatic
of wider issues in health and social care. Better analysis and
transparency are needed around the costs and impacts of this
issue, and the outcomes of initiatives to address it.

Page 19

19Appendix 2
Appendix 2
Plans are in place to ensure Section 102 Best Value reports for all 
32 councils are presented to the Commission by the end of the current
five-year audit appointment. The Controller of Audit has published the
following such reports since February 2025:
• Controller of Audit report: Fife Council (February 2025) – The
report concludes that the council must set out how it will respond
to worsening inequalities, significant in-year financial challenges
(including a large IJB overspend), Housing Revenue Account
pressures and its significant use of reserves. The Commission
welcomed improved performance reporting, cross-party
collaboration on difficult decisions, and the council’s innovative
approach to workforce challenges.
• Controller of Audit report: Argyll and Bute Council (April 2025)
– The report recognised a long-standing culture of innovation as
the council looks to close its budget gap. The council has delivered
significant recurring savings, but the report emphasised that a more
strategic approach to transformation is now required.
• Controller of Audit report: The Highland Council (April 2025) –
The Commission welcomed the progress made since the council’s
last Best Value Assurance Report in 2020, commending the
council’s culture of transformation. The Commission also noted that
savings challenges and financial risks still lie ahead.
• Controller of Audit report: Renfrewshire Council (June 2025) –
The report recognised improvement following the recent Section
102 report on Dargavel school accommodation. The report details
how past prudent financial management has helped smooth
financial challenges and how the next phase of transformation will
be critical in tackling the council’s growing budget gap. Additionally,
the Commission welcomed the council’s commitment to leadership
and creating a positive working culture across services.
• Controller of Audit report: East Lothian Council (July 2025)
– The report sets out that performance has been maintained
or improved in many areas, despite an increase in demand and
financial challenges. However, the Commission highlighted that the
use of reserves to balance budgets is unsustainable. It emphasised
the need for an increased focus on transformation and continuing
to develop opportunities to collaborate and share services as being
crucial to future service delivery.

Page 20

Appendix 2 20
• Controller of Audit report: North Ayrshire Council (October
2025) – The report commended the council for working effectively
with the other Ayrshire councils and local partners, exploring
sharing services and doing things differently as it looks to tackle the
significant financial challenges and future service pressures that lie
ahead with sustainable solutions.
• Controller of Audit report: North Lanarkshire Council (January
2026) – The report commended the council’s ambitious vision,
place-based approach and strong partnership working, alongside
its high-performing housing and homelessness services. It also
highlighted declining satisfaction levels and a large budget gap,
noting that while the council is well placed to respond through
transformation and effective financial management, it must set out
how services will be delivered in the longer term.
95. The Controller of Audit also published the following reports under
Section 102 over the last year based on the findings of 2023/24 annual
audit work:
• The 2023/24 audit of Glasgow City Council: Senior officer exit
packages (September 2025) – Auditors found that the processes,
decisions and actions around significant early retirement and
redundancy payments for five senior officers fell short of the
behaviour and standards expected of public servants.
• Cyber-attack affecting operations and services: The 2023/24
audit of Comhairle nan Eilean Siar (November 2025) – The report
highlighted that all Scottish councils must learn from the immediate
and ongoing impacts of a significant cyber-attack on Comhairle nan
Eilean Siar.

Page 21

Annual Assurance and
Risks Report
A review of 2024/25 local government
audits in Scotland
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500
www.audit.scot
ISBN 978 1 918486 03 2