Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 4 August 2022
Back to Argyll and Bute Harbour Board — 4 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
28 July 2022 
NOTICE OF MEETING 
A Special meeting of the ARGYLL AND BUTE HARBOUR BOARD will be held ON A HYBRID
BASIS BY ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR BY
MICROSOFT TEAMS on THURSDAY, 4 AUGUST 2022 at 10:00 AM, which you are requested to
attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. OBAN BAY DEVELOPMENT / NORTH PIER EXTENSION PROPOSALS 
(Pages 3 - 8)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
4. OBAN BAY UPDATE (Pages 9 - 16)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
Argyll and Bute Harbour Board 
Councillor Robin Currie Councillor John Armour
Councillor Jim Lynch Councillor Andrew Vennard
Councillor Garret Corner Councillor Andrew Kain (Chair)
Councillor Ian MacQuire Councillor Ross Moreland (Vice-Chair)   
Contact: Stuart Mclean, Committee Manager - 01436 658717                   
Hazel MacInnes, Committee Services Officer - 01546604269
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL  HARBOUR BOARD 
ROADS AND INFRASTRUCTURE
SERVICES 
4 AUGUST 2022 
OBAN BAY DEVELOPMENT / NORTH PIER EXTENSION PROPOSALS 
1.0      EXECUTIVE SUMMARY 
1.1 As part of the Council’s existing Harbour Authority area in Oban the council
owns and manages a commercial berthing face at North Pier. This berthing face
is in high demand and increasingly has insufficient capacity to meet the
demands being made from commercial vessels. During the last year, 2 to 3
vessels per week have been turned away despite enquiries dropping due to
repeated regular refusals. Recent salt deliveries have been disrupted and
rescheduled due to the restricted access of heavy cranes on the cantilever
pier edge. Also the availability of berthing space for CFL lifeline ferries has
resulted in disruption to our other regular customers.  
1.2  Oban Bay and the North Pier are of strategic importance for economic and
tourism not only to the community of Oban but also to the hinterland of Oban,
the many island communities who rely on Oban for strategic transport links,
for aquiculture, off shore energy together with many other commercial and
recreational users. 
1.3 This report proposes to progress a Business Case, for future consideration by
the Harbour Board, for the extension of North Pier as a commercial
development opportunity providing much needed additional berthing. 
2.0  RECOMMENDATIONS 
2.1 The Harbour Board is asked to agree to a business case being progressed to
determine the viability of an extension to the North Pier, Oban. 
3.0 BACKGROUND AND EXISTING USE OF NORTH PIER 
3.1 North Pier Oban is part of the Council’s wider marine portfolio and is included
within the Harbour Authority area of the Council’s existing Statutory Harbour
Authority in Oban. North pier is used by numerous commercial vessels including
but not limited to: overnight and daytime berthing of CalMac’s Lismore ferry; fish
farm work boats; large sail boats; barges delivering road salt and other
Page 3 Agenda Item 3

Page 4

materials; logging boats; and small to medium cruise ships etc. 
3.2 The existing North Pier is approximately 75m long and has a berthing depth of
3m at its southern end and 5m at its northern end. This means that there are
limitations in berthing, particularly during certain tidal conditions. Furthermore,
due to the construction of the berthing face there are loading restrictions at the
edge which means that heavy plant such as excavators for unloading barges
are restricted in how they operate. 
3.3 Following the development of the transit berth pontoons there has been an
increase in the demand for commercial berthing at North Pier and it is not
uncommon for vessels to be turned away. The increase in cruise vessel
business visiting Oban, increase in the size and frequency of fish farm vessels
and the summer ‘Tall Ships’ visits. There may also be future increased CFL /
CalMac ferry traffic requiring layovers due to CMAL upgrades at the Railway
Pier. 
3.4 Some work has previously been carried out around concept design for the
extension of the berthing face at North Pier. Furthermore, following the decision
in December 2021 by the Harbour Board for the Council to progress the
Municipal Harbour Authority, officers have held workshop sessions to consider
how best to reinvigorate a project to develop a pier extension. This also looked
at the additional local economic benefit which could be brought to the area,
particularly considering the strategic importance of Oban Bay and North Pier. 
3.5 The scope of the proposal would include extending and strengthening the North
Pier by up to an additional 50m and dredging to a usable uniform depth of 5m to
facilitate and future proof the berthing face for commercial customers. These
works would help to ensure a safe and efficient through traffic management of
commercial and private vehicles using the pier. 
3.6 Whilst it would be necessary to consider a range of potential design solutions,
extending the width of the existing pier face into the sea to create additional
working space, as well as providing strengthening to the edge of the pier
together with lengthening the pier to the north, would provide a significant
additional berthing face for commercial vessels. Note the final detail of any pier
extension, if progressed would be dependent on the usual design process. This
concept proposal would also provide additional opportunities for cruise vessels
to use the North Pier as a step ashore facility rather than relying on using
tenders to transport passengers form anchorages elsewhere in the bay. 
3.7 There are 4 options which were considered as part of the concept design
process which are summarised in the table below. 
Option Summary description of
option
Benefits Drawbacks
1 A 50m extension to the
northwest along the lines of the
pontoon breakwater and
following the present berthing
This option
originally looked
at foot access to
the extension as
Although the
berthing face
would be
extended it would
Page 4

Page 5

face. There are further
variations depending on scale
of access and usability of the
extended area for vehicles etc.
well as additional
access to the
breakwaters and
pontoons. It would
most suit CFL
layovers and
cruise vessel
visits.
It represents the
minimal cost while
lengthening the
berthing face.
be restrictive to
commercial
vessels which will
need to ‘work’ at
the pier while
alongside. It would
need to be
accessible to a
variety of vessel
gangways so
would still be
required to have a
reasonable width
and structure.
2 Extending out to seaward by
10m of the existing working
berthing face.
This puts the
workable berthing
face into the more
desirable deeper
water suitable for
larger commercial
vessels.
Doesn’t extend
the length of the
working face and
presents a
potential
constraint on the
CFL approach to
the Railway
Quays. Larger
beamed vessels
would more likely
be ‘Doubled up’
due to the lack of
extra length.
3 A combination of 1 + 2 above
giving the depth and length for
larger vessels.
A long deep
berthing face
would be ideal for
larger deeper
vessels without
tidal restrictions.
This could
exacerbate the
issues with CFL
vessels
approaching the
Railway Quay.
Extending the
length from this
position also puts
the construction
into deeper water
which increases
the cost and
complicates the
engineering
requirements for
larger vessel
loadings.
4 A specific variation to option 1
above with land reclamation of
the shallow waters alongside
the existing northwest facing
A narrower
reclamation would
see an inverted ‘L’
shaped quay
Expenditure and
time to complete.
Page 5

Page 6

wall and perhaps the esplanade
wall.
which would give
extra sheltered
berthing spaces
as well as the
opportunity to
improve the
function and
access to the Pier
and car park
areas. 
3.8  This report proposes that a Business Case is developed to test the benefits of
extending the North Pier. The Business Case would consider the strategic fit,
financial viability together with climate change etc. Other benefits to the local
community which can be considered but lay outside the Marine scope would
include increased footfall into the town center, improvement to traffic on the
pier, job creation and retention in the north Lorn area (aquaculture,
aggregates and supporting industries, tourism, and services). 
3.9 Should the Council progress this marine project it would be carried out on the
basis that it would be self-funding and provide an additional strategic asset for
Oban and the islands which Oban serves. The cost of the project could well be
encompassed within some existing funding mechanisms. The funding options
would, in various combinations, potentially include ‘Lorn Arc’ TIF existing
North Pier Extension project fund; external Capital Grants, Scottish
Government loan funds e.g. Crown Estate and funding through the existing
marine asset management plan where loans charges would be serviced from
fees and charges. 
4.0 CONCLUSION 
4.1 The existing berthing face at North Pier Oban is receiving more demand than it
is able to satisfy for berthing and laying of vessels overnight. Oban bay has
limited commercial berthing facilities available. This report proposes that a
Business Case is progressed of the extension of North Pier to enable additional
berthing to take place and also to make the pier more versatile by improving the
edge of the existing structure to facilitate better loading and unloading of
vessels. 
5.0 IMPLICATIONS 
5.1 Policy – The Harbour Board agreed in December 2021 that the Council should
proceed to make the arrangements to formally manage the unmanaged
section of Oban Bay.   
5.2 Financial – the Business Case would be funded through the Marine Asset
management Plan with any future investment of North Pier being self-funding
through the recovery of fees and charges which would be used to cover any
loan repayments together with future asset sustainability costs.
Page 6

Page 7

5.3 Legal – any works to extend the North Pier will be subject to a works harbor
order. 
5.4 HR – HR implications will be identified as the proposal progresses.   
5.5  Fairer Scotland Duty: None known.
5.5.1   Equalities – None known. 
5.5.2   Socio-economic Duty – None known.
5.5.3 Islands – consultation will be carried out with the island communities as a
continuation and expansion of the Options Appraisal Process reported to the
December harbour Board not only for the progression of a Municipal Harbour
Authority but also regarding any expansion of marine infrastructure at North
Pier. 
5.6 Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  
5.7 Risk – Risk will be managed in a proportionate way as per normal development
and contract projects.  
5.8  Customer Service – None known. 
Executive Director with responsibility for Roads and Infrastructure, Kirsty
Flanagan 
Head of Roads and Infrastructure, Jim Smith 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
June 2022 
For further information contact: Jim Smith, Head of Roads and Infrastructure, or
Scott Reid, Marine Operations Manager 
Page 7

Page 8

This page is intentionally left blank

Page 9

ARGYLL AND BUTE COUNCIL  HARBOUR BOARD 
ROADS AND INFRASTRUCTURE
SERVICES 
4 AUGUST 2022 
OBAN BAY UPDATE 
1.0 INTRODUCTION 
1.1 This report is provided to update Members on the progress being made since
the decision of the Special Harbour Board meeting in December 2021 and the
previous update to the Harbour Board meeting in March 2022 in respect of
Oban Bay. 
RECOMMENDATION: 
The Harbour Board is asked to note and consider the update provided in this
report.  
Page 9 Agenda Item 4

Page 10

ARGYLL AND BUTE COUNCIL  HARBOUR BOARD 
ROADS AND INFRASTRUCTURE
SERVICES 
4 AUGUST 2022 
OBAN BAY UPDATE 
2.0 EXECUTIVE SUMMARY 
2.1  This report provides an update following the Harbour Board Meeting, which took
place in March 2022, on progress since the Special Meeting in December 2021
and the next steps which officers require to undertake.   
3.0  RECOMMENDATIONS 
3.1 The Harbour Board is asked to note and consider the update provided in this
report.   
4.0 DETAIL 
SPECIAL HARBOUR BOARD, DECEMBER 2021 
4.1 The Harbour Board made the following decision at its Special Meeting in
December 2021: 
The Argyll and Bute Harbour Board:  
1.    Thanked Caledonian Economics for their work on the Options Appraisal;  
2.    Agreed that the Council would not at this time proceed with a transfer of
assets on the basis that there were too many uncertainties around the
proposal;  
3.    Noted that Options 4 or 5 (Argyll and Bute Council or Caledonian Maritime
Assets Limited (CMAL) becoming the Harbour Authority for the
unmanaged section of Oban Bay) provides a quicker route to addressing
the current safety concerns and are therefore the best options available at
this time;  
4.    Agreed that either Options 4 or 5 should move forward and request that
Officers engage with CMAL, through the OBMG, on the basis that the
Council’s preference would be option 5 and that the Council was prepared
to be the Harbour Authority for the unmanaged section of Oban Bay, to
begin the process of application for a Harbour Revision Order covering the
Page 10

Page 11

unmanaged section of Oban Bay and to expedite the process for such an
order and to report back to members on that process;  
5.    Noted that there was no inherent reason why a Trust Port would not be a
good future option; and  
6.    Agreed that once Options 4 or 5 were delivered there would be a period of
bedding in to monitor the new arrangement and, after that time, there
would be a further report to members on the potential for and exploration of
the future development of a Trust Port. 
HARBOUR BOARD MARCH 2022 UPDATE 
4.2 Since the instruction from the Harbour Board to progress matters, Officers have
held several sessions with key external bodies including CMAL, CalMac,
Transport Scotland and Northern Lighthouse Board with additional support and
assistance from the Council’s external Marine Designated Person. 
4.3 CMAL have agreement from their Board that Argyll and Bute Council will
progress becoming Municipal Port Authority for the unmanaged areas of Oban
Bay. 
4.4 These initial discussions were critical to determining how matters should
progress. It was agreed with the various parties that the Council would begin the
process of developing the process of applying for a Harbour Revision Order
(HRO) covering the unmanaged sections of Oban Bay. 
4.5 A high level project timeline has been shared with the above noted key
stakeholders for their input and is now published on the Argyll and Bute Council
website. This will be updated regularly with information or changes. 
4.6  At the Oban Bay Management Group meeting on 11 January the majority of the
members of the group endorsed the proposal by the Council to become a
Municipal Harbour Authority for the unmanaged waters within Oban Bay. 
4.7 Good progress has been made with the Council’s legal team regarding the
provisions to be drafted for inclusion within the draft order and to further develop
a plan for progression of the Statutory Harbour Authority (SHA) which requires a
HRO to allow the formal management and running of Oban Bay. Good progress
has also been made with the Council’s internal team who have scoped out initial
requirements for: 
 Harbour limits
 Vessel Traffic System
 Extended Oil Spill Response
 Extended bathymetric survey provision
 Work vessel requirements
 Web site enhancement and content
 Operating hours and staffing requirements
 Financial model
Page 11

Page 12

 Communications strategy – including communication and
engagement with stakeholders.
 Outline business case for extension of North Pier as a concept to
develop. 
Essentially the above points are an extension of the current management of the
Council’s 39 piers and harbours. The systems and expertise are in place across
the existing assets and team, and are being adapted to suit the needs of Oban
Bay.   
PROGRESS SINCE MARCH 2022 
4.8 Meeting held with the Policy Lead for Roads and Transportation; the two
Executive Directors; Heads of Service for Legal and Regulatory and Roads and
Infrastructure, to brief the Policy Lead on Oban Bay matters. 
4.9 ABPmer have been engaged and are working to complete the Navigational Risk
Assessment (NRA) which will inform the decision on the final external harbour
limits as well as the Traffic Management levels which will be required in the bay. 
The requirement for marine traffic data to support the NRA is laid out in MCA
Marine Guidance Note (MGN) 654 and states that:
‘This should include all the vessel and craft types found in the area and total
at least 28 days duration but also take account of seasonal variations and
peak times in traffic patterns and fishing operations. AIS data alone will not
constitute an appropriate traffic survey; radar, manual observations, other
data sources (e.g. for fishing and recreation) and stakeholder consultation will
ensure those vessels that are not required to carry and operate AIS are
included, and it provides an appropriate representation of the base line marine
traffic.’ 
A Marine Traffic Data Collection plan is currently with the MCA for views and
proposes to provide the required 28 days survey duration split into two 14-day
periods: one in the last two weeks in July 2022 and a further two weeks over a
subsequent quiet period. The ‘busy’ data collection period was identified and
refined based on programmed activity, which is planned to occur in addition to
the usual commercial, ferry, aquaculture and recreational activity. Noted 2022
activities include the following:
 Yacht club events:
Monday mayhem: every Monday
Cruising weekend: 16-17 July
Theme series: 19 July
Round Branra Race: 24 July
July Cup Race: 21 July
West Highland Yachting week: 30 July to 05 August
 Sea Tours happening July and August
 Sea Kayaking Trips
Page 12

Page 13

July: 14, 18, 29
August: 01, 05, 07
July: 21, 22, 24, 25, 28, 29
August: 04, 07, 08
July: 21, 22, 24, 25
August: 01, 08
 Sea Kayaking Courses
July: 27-28 
August: 03-04
August: 06-07
 Sea Kayaking Expeditions:
July: 15-17
July: 30-31 
As part of the data collection method, ABPmer, in association with Argyll and
Bute Council will consult with local operators to obtain additional information
on vessel traffic routing and activity levels within the Oban Bay, its
approaches and Kerrera Sound. The aim of this consultation will be the
quantification of vessel traffic data, especially for vessel moves that may not
occur during the 14-day onsite observations. It should be noted that this
consultation is in addition to the NRA stakeholder engagement, which will be
scheduled separately following the Marine Traffic Data Collection exercise. 
Appendix 1 shows the proposed Harbour Limits which will form the baseline
for the Marine Traffic Data Collection.
4.10 Officers continue to work with the Argyll and Bute Council legal team and
Brodies to pull together the first draft of the Harbour Order.
4.11 A website page has been published with the project plan and will be regularly
updated with supporting information.
4.12 The next key milestones for report to the regular September Harbour Board
meeting are:
(1) Informal stakeholder consultation and briefing carried out during a 6-week
period in July and August. This will be extensive and extra to the other
consultations required by the process encompassing the wider Island
Communities reliant on Oban for commuting and services. 
(2) Marine Traffic Data Collection (summer) including stakeholder consultation
(3) Recommended external Harbour Limits based on summer data &
consultation information.
(4) 1st Draft of the HRO for review and comment including Powers and
Provisions.
(5) Completion / progress of NRA and traffic management assessment. 
5.0 CONCLUSION 
5.1 Since the Special Meeting of the Harbour Board in December 2021, good
progress has been made in preparing to submit a formal Harbour Revision
Page 13

Page 14

Order. Once the key milestones outlined above are concluded, a further report
will be brought back to Members of the Harbour Board to agree the limits and
powers which will be included in the draft Order. 
6.0 IMPLICATIONS 
6.1 Policy – The Harbour Board agreed in December 2021 that the Council should
proceed to make the arrangements to formally manage the unmanaged
section of Oban Bay.   
6.2 Financial – No financial implications at this stage.  As the proposals develop,
further detail will be brought to the Harbour Board.   
6.3 Legal – the HRO process is a formal legal process set out in the 1964
Harbours Act. 
6.4 HR – HR implications will be identified as the proposal progresses.   
6.5  Fairer Scotland Duty: 
6.5.1   Equalities – None known. 
6.5.2   Socio-economic Duty – None known.
6.5.3 Islands – consultation will be carried out with the island communities as a
continuation and expansion of the Options Appraisal Process reported to the
December Harbour Board.
6.6 Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  
6.7 Risk - The Council progressing to become a Municipal Port Authority for the
unmanaged areas of Oban Bay increases the safety within Oban Bay.  There
is a risk that there could be a number of objections and representations during
the process which could impact on timescale and these will be considered as
and when they arise.  
6.8  Customer Service – None known. 
Executive Director with responsibility for Roads and Infrastructure, Kirsty
Flanagan 
Head of Roads and Infrastructure, Jim Smith 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
June 2022                                 
For further information contact: Jim Smith, Head of Roads and Infrastructure, or
Scott Reid, Marine Operations Manager
Page 14

Page 15

Appendix 1
Oban Bay Proposed Harbour Limits
Below are the proposed Argyll & Bute Council limits for Oban Harbour which
will be the baseline for data collection. The CMAL area around the Railway pier
has been left out of the chart but will of course be nested within the larger
Municipal area. The limits have been derived following initial consultation with
NLB, CMAL & CFL / CalMac but will be informed and refined based on
information gleaned from the required NRA process. 
The area enclosed by the northern boundary includes the No 1 and No 3
anchorages which are marked with the magenta anchor symbols. 
The southern limit extends to beyond the CFL ferry service to Kerrera but may
be revised south following data collection. 
KEY FOR CHARTS 
Mark Image Description
Purple lines  Indicate the limits of the proposed
Harbour limits – subject to the
NRA and any consultation
feedback 
Star Points  Indicate the points on the
boundaries which define the
limits
Page 15

Page 16

Page 16