ARGYLL AND BUTE COUNCIL  HARBOUR BOARD 
ROADS AND INFRASTRUCTURE
SERVICES 
4 AUGUST 2022 
OBAN BAY DEVELOPMENT / NORTH PIER EXTENSION PROPOSALS 
1.0      EXECUTIVE SUMMARY 
1.1 As part of the Council’s existing Harbour Authority area in Oban the council
owns and manages a commercial berthing face at North Pier. This berthing face
is in high demand and increasingly has insufficient capacity to meet the
demands being made from commercial vessels. During the last year, 2 to 3
vessels per week have been turned away despite enquiries dropping due to
repeated regular refusals. Recent salt deliveries have been disrupted and
rescheduled due to the restricted access of heavy cranes on the cantilever
pier edge. Also the availability of berthing space for CFL lifeline ferries has
resulted in disruption to our other regular customers.  
1.2  Oban Bay and the North Pier are of strategic importance for economic and
tourism not only to the community of Oban but also to the hinterland of Oban,
the many island communities who rely on Oban for strategic transport links,
for aquiculture, off shore energy together with many other commercial and
recreational users. 
1.3 This report proposes to progress a Business Case, for future consideration by
the Harbour Board, for the extension of North Pier as a commercial
development opportunity providing much needed additional berthing. 
2.0  RECOMMENDATIONS 
2.1 The Harbour Board is asked to agree to a business case being progressed to
determine the viability of an extension to the North Pier, Oban. 
3.0 BACKGROUND AND EXISTING USE OF NORTH PIER 
3.1 North Pier Oban is part of the Council’s wider marine portfolio and is included
within the Harbour Authority area of the Council’s existing Statutory Harbour
Authority in Oban. North pier is used by numerous commercial vessels including
but not limited to: overnight and daytime berthing of CalMac’s Lismore ferry; fish
farm work boats; large sail boats; barges delivering road salt and other

Page 2

materials; logging boats; and small to medium cruise ships etc. 
3.2 The existing North Pier is approximately 75m long and has a berthing depth of
3m at its southern end and 5m at its northern end. This means that there are
limitations in berthing, particularly during certain tidal conditions. Furthermore,
due to the construction of the berthing face there are loading restrictions at the
edge which means that heavy plant such as excavators for unloading barges
are restricted in how they operate. 
3.3 Following the development of the transit berth pontoons there has been an
increase in the demand for commercial berthing at North Pier and it is not
uncommon for vessels to be turned away. The increase in cruise vessel
business visiting Oban, increase in the size and frequency of fish farm vessels
and the summer ‘Tall Ships’ visits. There may also be future increased CFL /
CalMac ferry traffic requiring layovers due to CMAL upgrades at the Railway
Pier. 
3.4 Some work has previously been carried out around concept design for the
extension of the berthing face at North Pier. Furthermore, following the decision
in December 2021 by the Harbour Board for the Council to progress the
Municipal Harbour Authority, officers have held workshop sessions to consider
how best to reinvigorate a project to develop a pier extension. This also looked
at the additional local economic benefit which could be brought to the area,
particularly considering the strategic importance of Oban Bay and North Pier. 
3.5 The scope of the proposal would include extending and strengthening the North
Pier by up to an additional 50m and dredging to a usable uniform depth of 5m to
facilitate and future proof the berthing face for commercial customers. These
works would help to ensure a safe and efficient through traffic management of
commercial and private vehicles using the pier. 
3.6 Whilst it would be necessary to consider a range of potential design solutions,
extending the width of the existing pier face into the sea to create additional
working space, as well as providing strengthening to the edge of the pier
together with lengthening the pier to the north, would provide a significant
additional berthing face for commercial vessels. Note the final detail of any pier
extension, if progressed would be dependent on the usual design process. This
concept proposal would also provide additional opportunities for cruise vessels
to use the North Pier as a step ashore facility rather than relying on using
tenders to transport passengers form anchorages elsewhere in the bay. 
3.7 There are 4 options which were considered as part of the concept design
process which are summarised in the table below. 
Option Summary description of
option
Benefits Drawbacks
1 A 50m extension to the
northwest along the lines of the
pontoon breakwater and
following the present berthing
This option
originally looked
at foot access to
the extension as
Although the
berthing face
would be
extended it would

Page 3

face. There are further
variations depending on scale
of access and usability of the
extended area for vehicles etc.
well as additional
access to the
breakwaters and
pontoons. It would
most suit CFL
layovers and
cruise vessel
visits.
It represents the
minimal cost while
lengthening the
berthing face.
be restrictive to
commercial
vessels which will
need to ‘work’ at
the pier while
alongside. It would
need to be
accessible to a
variety of vessel
gangways so
would still be
required to have a
reasonable width
and structure.
2 Extending out to seaward by
10m of the existing working
berthing face.
This puts the
workable berthing
face into the more
desirable deeper
water suitable for
larger commercial
vessels.
Doesn’t extend
the length of the
working face and
presents a
potential
constraint on the
CFL approach to
the Railway
Quays. Larger
beamed vessels
would more likely
be ‘Doubled up’
due to the lack of
extra length.
3 A combination of 1 + 2 above
giving the depth and length for
larger vessels.
A long deep
berthing face
would be ideal for
larger deeper
vessels without
tidal restrictions.
This could
exacerbate the
issues with CFL
vessels
approaching the
Railway Quay.
Extending the
length from this
position also puts
the construction
into deeper water
which increases
the cost and
complicates the
engineering
requirements for
larger vessel
loadings.
4 A specific variation to option 1
above with land reclamation of
the shallow waters alongside
the existing northwest facing
A narrower
reclamation would
see an inverted ‘L’
shaped quay
Expenditure and
time to complete.

Page 4

wall and perhaps the esplanade
wall.
which would give
extra sheltered
berthing spaces
as well as the
opportunity to
improve the
function and
access to the Pier
and car park
areas. 
3.8  This report proposes that a Business Case is developed to test the benefits of
extending the North Pier. The Business Case would consider the strategic fit,
financial viability together with climate change etc. Other benefits to the local
community which can be considered but lay outside the Marine scope would
include increased footfall into the town center, improvement to traffic on the
pier, job creation and retention in the north Lorn area (aquaculture,
aggregates and supporting industries, tourism, and services). 
3.9 Should the Council progress this marine project it would be carried out on the
basis that it would be self-funding and provide an additional strategic asset for
Oban and the islands which Oban serves. The cost of the project could well be
encompassed within some existing funding mechanisms. The funding options
would, in various combinations, potentially include ‘Lorn Arc’ TIF existing
North Pier Extension project fund; external Capital Grants, Scottish
Government loan funds e.g. Crown Estate and funding through the existing
marine asset management plan where loans charges would be serviced from
fees and charges. 
4.0 CONCLUSION 
4.1 The existing berthing face at North Pier Oban is receiving more demand than it
is able to satisfy for berthing and laying of vessels overnight. Oban bay has
limited commercial berthing facilities available. This report proposes that a
Business Case is progressed of the extension of North Pier to enable additional
berthing to take place and also to make the pier more versatile by improving the
edge of the existing structure to facilitate better loading and unloading of
vessels. 
5.0 IMPLICATIONS 
5.1 Policy – The Harbour Board agreed in December 2021 that the Council should
proceed to make the arrangements to formally manage the unmanaged
section of Oban Bay.   
5.2 Financial – the Business Case would be funded through the Marine Asset
management Plan with any future investment of North Pier being self-funding
through the recovery of fees and charges which would be used to cover any
loan repayments together with future asset sustainability costs.

Page 5

5.3 Legal – any works to extend the North Pier will be subject to a works harbor
order. 
5.4 HR – HR implications will be identified as the proposal progresses.   
5.5  Fairer Scotland Duty: None known.
5.5.1   Equalities – None known. 
5.5.2   Socio-economic Duty – None known.
5.5.3 Islands – consultation will be carried out with the island communities as a
continuation and expansion of the Options Appraisal Process reported to the
December harbour Board not only for the progression of a Municipal Harbour
Authority but also regarding any expansion of marine infrastructure at North
Pier. 
5.6 Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  
5.7 Risk – Risk will be managed in a proportionate way as per normal development
and contract projects.  
5.8  Customer Service – None known. 
Executive Director with responsibility for Roads and Infrastructure, Kirsty
Flanagan 
Head of Roads and Infrastructure, Jim Smith 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
June 2022 
For further information contact: Jim Smith, Head of Roads and Infrastructure, or
Scott Reid, Marine Operations Manager