Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 22 December 2022
Back to Argyll and Bute Harbour Board — 22 December 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
15 December 2022 
NOTICE OF MEETING 
A Special meeting of the ARGYLL AND BUTE HARBOUR BOARD will be held ON A HYBRID
BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT
TEAMS on THURSDAY, 22 DECEMBER 2022 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
* 3. PIERS & HARBOURS - MARINE ASSET MANAGEMENT PLAN FEES &
CHARGES 2023 / 2024 (Pages 3 - 8)  
Report by Executive Director with responsibility for Roads and Infrastructure 
4. OBAN BAY UPDATE (Pages 9 - 52)  
Report by Executive Director with responsibility for Roads and Infrastructure 
Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
Argyll and Bute Harbour Board 
Councillor John Armour Councillor Jim Lynch
Councillor Andrew Vennard Councillor Garret Corner
Councillor Andrew Kain (Chair) Councillor Ian MacQuire
Councillor Ross Moreland (Vice-Chair) Councillor Amanda Hampsey   
Contact: Hazel MacInnes  Tel: 01546 604269
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL     ARGYLL AND BUTE HARBOUR BOARD
ROADS AND INFRASTRUCTURE SERVICES                22 DECEMBER 2022 
PIERS & HARBOURS - 
MARINE ASSET MANAGEMENT PLAN FEES & CHARGES 2023 / 2024 
1.0 INTRODUCTION 
1.1 This report allows Members to consider the necessary increase in fees and
charges for the forthcoming financial year 2023 / 2024, in order to meet the
requirements for the Argyll & Bute Council Asset Management Plan referenced in
the September 2022 Harbour Board report. 
2.0 RECOMMENDATIONS 
2.1.1 Members are asked to:
2.1.1  Recommend to the Council, when setting the fees and charges for 2023/2024
that it approves an increase to piers and harbours fees and charges of 5%,
over and above an inflationary increase which will be ring fenced to develop
the Council’s marine infrastructure.
2.1.2  Note that this presents a stepped “proposed increase to allow smoothing” over a
10 year period for meeting both the sustainability costs and future improvement
costs associated with the marine infrastructure which Argyll & Bute Council has
responsibility for.
2.1.3  Agree that the asset management plan will continue to be updated on a rolling
10 year basis.   
3.0 BACKGROUND 
3.1 It was agreed at the December 2020 Harbour Board meeting that any fees and
charges; “…increase will be in-step with the motion passed at the Harbour Board
meeting in January 2018 that agreed to set charges that meet both the asset
sustainability costs and future improvement costs associated with the piers and
harbours which the Council has a responsibility for.”
3.2 In line with the above agreement, it has been highlighted in previous reports that
fees and charges will be set at a level which ensures the income generated at
Page 3 Agenda Item 3

Page 4

each of the Council’s main ferry ports covers total costs for each individual port
plus a contribution to central ‘piers and harbours’-related costs.
4.0 DETAIL 
In order to fund the various works identified in the Marine Asset Management
Plan it is necessary to increase fees and charges, over and above any
required inflationary increase, on a year-on-year basis. Annual increases in
future years are expected to be in the order of between 2% and 10%,
depending upon confirmed works identified for that particular year (plus any
inflationary increase). 
4.1 Present expenditure 
Projects highlighted in the Asset Management Plan Report in March this year
totalled over £15 million of capital works which were programmed for the
2022/2023 financial year (plus any slippage brought forward from 2021/2022).
Table 1 - Summary of works from the Marine Asset Management Plan 2022/2023
Project Location Cost Estimate Works summary
Campbeltown
(New Quay)
Kintyre
South
£500,000 Link span refurbishment
Kintyre
South
£80,000 Fender piles refurbishment
Campbeltown
(Old Quay)
Kintyre
South
£500,000 Replace ‘wall A’ with new sheet piling
Kintyre
South
£50,000 RE duties
Craignure
(long term)
Mull £2,500,000 Long Term:
Detail design, FBC, compile tender
documentation
Craignure
(interim)
Mull £500,000 New PAS construction
Mull £100,000 Concrete works
Dunoon /
Kilcreggan
Kilcreggan £250,000 Design, GI & Tender documentation
Dunoon £250,000 Design, GI & Tender documentation
Dunoon Pier Dunoon £100,000 Works on timber pier
Feolin Ferry
slip
Jura £45,000 New fender system
Mull £5,000,000 New aligning structure: Construction
Page 4

Page 5

Iona /
Fionnphort
Mull £50,000 Design, RE studies (includes Iona)
Iona £5,000,000 Start construction breakwater
Gigha /
Tayinloan
Gigha £50,000 Consultancy for Design & Tender
documentation
Port Askaig Islay £50,000 Land acquisition & GI 
4.2 Previous Expenditure 
Since 2017/18 the council has increased Fees and Charges for Piers and
Harbours above inflation to fund prudential borrowing which in turn is financing
the Asset Management Plan. The table below shows the expenditure and
financing costs since 2017/18 with any residue being placed in earmarked
reserves to fund future expenditure. There is currently £1,642,811 held in
earmarked reserves to fund prudential borrowing for Piers & Harbours.  
Table 2 - Previous expenditure since 2017/2018 
2017-18 2018-19 2019-20 2020-21 2021-22 Total
Actual 319,873 1,485,304 2,759,589 788,161 1,191,927 6,544,854
Loans Charges 6,797 48,330 167,337 265,299 317,932 805,696
Additional Income 
generated by uplift
113,590 177,012 515,873 560,657 987,525 2,354,658
Surplus income added 
to earmarked reserves
107,041 133,050 367,750 362,384 672,586 1,642,811 
4.3 As shown in Table 3 below, the increase proposed for 2023 / 2024 is 5% over
and above an increase for the year. 
The proposed increases will cover Argyll and Bute Council’s present Marine
Infrastructure Asset Management Plan which includes projects across the entire
Council region. Many involve upgrades to Council infrastructure required for
planned CFL / CalMac (CFL) ferry service improvements and we continue to have
close liaison with Transport Scotland, CMAL and CFL to ensure lifeline services
are prioritised and resources are targeted accordingly and also to ensure any
planned project costs are included in future forecasts once confirmed. 
Page 5

Page 6

Proposed increases are smoothed over future years to avoid large spikes in the
increases which would be required to fund the asset management plan in the
years where large expenditure is planned.
Table 3 - Smoothing of Asset Management Plan Fees and Charges 
4.4 The proposed increases above any inflation will cover the Council’s present plans
including projects in partnership with Transport Scotland, CMAL and CFL, which
require Argyll & Bute Council infrastructure developments. Officers continue to
liaise closely with these bodies to ensure any planned project costs are included
in future forecasts once confirmed. 
The proposed increases will cover Argyll and Bute Council’s present Marine
Infrastructure Asset Management Plan and includes projects across the entire
Council region. Many involve upgrades to Council infrastructure required for
planned CFL / CalMac (CFL) ferry service improvements and we continue to have
close liaison with Transport Scotland, CMAL and CFL to ensure lifeline services
are prioritised and resources are targeted accordingly. The work carried out to
support ferry traffic is generally financed through these fees and charges which
are used to service loans charges for capital borrowing.
4.5 Future income 
The Asset Management Plan is an adaptable plan fed into by changing priorities
and circumstances. It also relies on steady and predictable income form those
ferry services utilising Argyll & Bute Council infrastructure. 
2022-
23
2023-
24
2024-
25
2025-
26
2026-
27
2027-
28
2028-
29
2029-
30
Planned 
expenditure 
£’000
15,550 23,025 28,200 17,811 182 0 0 500
Anticipated 
Annual 
Loans 
Charges 
£’000
748 1,187 2,424 3,938 4,895 4,906 4,906 4,906
Additional 
funding 
required to 
pay loans 
charges 
£’000
430 439 1,237 1,515 957 11 0 0
Increase 
required if 
fully funded 
in year
5.46% 4.87% 12.37% 14.03% 8.28% 0.09% 0.00% 0.00%
Proposed 
increase to 
allow 
smoothing
5.00% 5.00% 5.00% 4.00% 3.00% 2.00% 0.00% 0.00%
Page 6

Page 7

In recent years the COVID-19 pandemic and the UK’s withdrawal from the
European Union has made some of the variables less predictable and our ability
to engage contractors and consultants more difficult. 
A close watch on fees and charges income and its effect on future projects will be
maintained to ensure the statutory and priority works are delivered. 
The following table shows the anticipated income which will be generated by the
increased fees and charges and the effect it will have on the earmarked balance.
Table 4 - Profile of income and borrowing costs on Asset Management Plan   
2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30
Planned 
expenditure 
£’000
15,550 23,025 28,200 17,811 182 0 0 500
Anticipated 
Annual 
Loans 
Charges 
£’000
748 1,187 2,424 3,938 4,895 4,906 4,906 4,906
Anticipated 
additional 
income 
generated
£’000
1,465 1,882 2,483 3,133 3,775 4,455 4,574 4,574
Surplus 
transferred 
to / from 
earmarked 
reserves 
£’000
717 695 59 -806 -1,121 -452 -333 -333
Cumulative 
balance on 
earmarked 
reserves 
£’000
2,359 3,054 3,113 2,308 1,187 736 403 71 
5.0 CONCLUSION
5.1 The proposed fees and charges increase is required to fund future asset
sustainability and improvement costs for the Council’s present plans for piers and
harbours. 
6.0 IMPLICATIONS
6.1 Policy – None directly arising from this report. 
6.2 Financial – The proposed increase of fees and charges will ensure that future
income is sufficient to maintain and develop the Council’s marine assets. 
6.3  Legal – Considered to be none directly arising from this report.
Page 7

Page 8

6.4  HR – None.
6.5  Fairer Scotland Duty:  
6.5.1   Equalities - protected characteristics – None directly arising from this report.
6.5.2   Socio-economic Duty – None directly arising from this report.
6.5.3 Islands – Completed works and projects will enhance service reliability and
community connectivity.
6.6 Climate Change - there are no direct impacts in regard to climate change from
this report, due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  
6.7 Risk – Completed works will reduce the repair and maintenance on existing
infrastructure.  Above inflation increases may have a detrimental economic
impact on businesses using the facilities for example: 
 fishermen
 bulk importers
 timber exporters
 wind farm developers
 Cruise companies. 
Significant increases may also reduce usage and customers while making
attracting new business more difficult. 
External influences may come to bear on ferry usage patterns which may, in
turn, impact on income from ferry fees and charges i.e. Vessel breakdowns
and redeployments, Environmental issues (car use), Brexit, Covid 19 and
potential changes in RET. 
6.8  Customer Service – Customers and key stakeholders will be informed of fees
and charges when set. An overall improvement in travel experience and
reliability should result with improved and maintained infrastructure. 
Executive Director with responsibility for Roads and Infrastructure: Kirsty
Flanagan
Policy Lead for Roads and Transport: Councillor Andrew Kain
November 2022                                                  
For further information contact:
Scott Reid, Marine Operations Manager Tel: 01546 604 696
Jim Smith, Head of Roads and Infrastructure Services Tel: 01546 604 324 
Page 8

Page 9

ARGYLL AND BUTE COUNCIL  HARBOUR BOARD 
ROADS AND INFRASTRUCTURE
SERVICES 
22 DECEMBER 2022 
OBAN BAY UPDATE 
1.0 INTRODUCTION 
1.1 This report is provided to update Members on the status of plans to establish the
Municipal Oban Harbour and the progress of the Oban Harbour Revision Order
(HRO). 
1.2 The HRO includes proposed external harbour limits which have been justified by
an independent Navigational Risk assessment (NRA) process. 
2.0  RECOMMENDATIONS 
It is recommended that the Harbour Board:- 
2.1 Notes the update provided in this report; 
2.2 Notes the comments referenced from the Consultation period and the Council’s
response thereto; 
2.3 Approves the draft HRO for submission to Transport Scotland as the submission
to be confirmed as an HRO; 
2.4 Notes that the HRO will be submitted to Transport Scotland in the first case on
an informal basis as part of their best practice advice and that should there be
any material alterations requested by Transport Scotland then they will be
brought back to the Harbour Board for approval; and 
2.5 Notes the governance arrangements in respect of the Harbour Authority.   
3.0 DETAIL   
Harbour Revision Order (HRO) 
3.1.1 The draft HRO has been produced by the Service with advice from the Council’s
Legal Services in liaison with external advisers. This was posted on the
Council’s website for public responses and issued to statutory consultees and
others for comment. We received comments from Transport Scotland,
Caledonian Maritime Assets Ltd (CMAL), CalMac Ferries Ltd (CFL), Northern
Page 9 Agenda Item 4

Page 10

Lighthouse Board (NLB) and Oban Community Harbour Development
Association (OCHDA) among others which were reviewed by our legal team and
incorporated where appropriate in the final draft. The HRO is shown in appendix
1. 
Comments and feedback from the consultation can be found here (Click here)  
3.1.2 The draft will be issued to Transport Scotland who will accept this, in the first
instance on an informal basis. This is considered to be best practice and allows
Transport Scotland the opportunity for informal discussion with the Council on
the content before they then accept as a formal submission for public
consultation. Transport Scotland will undertake a 42 day period public
consultation. The draft Order before members today along with the Harbour
limits, if approved, will be submitted to Transport Scotland as the submission to
be confirmed as an HRO. 
3.1.3 An HRO lays out the some of the powers which the Harbour Authority will need
to effectively run the day-to day operations. Other powers are detailed in
historical Acts, some of which need modernising, clarifying or repealed to ensure
modern language and practices are reflected appropriately. The HRO also sets
out the limits of the Statutory Harbour Authority’s jurisdiction in the form of
harbour limits. Transport Scotland, as part of their process, will require
justification for the requested powers and limits to ensure their effects are
reasonable and just. The powers and effects are shown in appendix 2. The
harbour limits are shown in appendix 3. 
Navigational Risk Assessment (NRA)  
3.1.4 In the process of raising a HRO there is a requirement for a Navigational Risk
Assessment (NRA) as part of the assessment process to understand the current
level of marine risk and proposed mitigation for reducing the risk. This follows
the requirements of the Port Marine Safety Code (DfT, 2016).  
3.1.5 The NRA will be reviewed by the Maritime and Coastguard Agency (MCA) as
the competent authority with a marine safety remit for Oban Bay as most of the
area is currently outside of a statutory harbour area. It is used to inform, and
provide justification for, the external limits and jurisdiction of Oban Harbour as
well as the required degree of traffic monitoring and therefore staffing levels. 
3.1.6 Summer observations were completed over the busiest period of traffic from 18th
to the 31st July 2022 and also included engagement with users as well as a
Hazard Identification session (HazID) where users could comment and provides
additional input to augment the observational data. 
External Harbour Limits  
3.1.7 The NRA establishes a navigational baseline on which a decision can be made
on the external limits of the Harbour. It is incumbent on the HRO applicant to
justify any extension to the jurisdiction of its Harbour area in terms of improving
safety for users and the data gleaned from the busiest period of the summer
Page 10

Page 11

fulfils that need.  
3.1.8 The data gathered during this process by ABPMer confirms that the proposed
external limits put forward by Argyll & Bute Council are justified and should now
form part of the HRO application. A further winter observation period required by
the MCA is being conducted in early December and will highlight any additional
mitigation measures which may be required by the winter traffic pattern.   
Consultation 
3.1.9 In addition to the formal HRO process, an informal consultation was carried out
over a 6 week period. As part of this process details were sent to over 1000
addresses including all statutory consultees; Argyll & Bute Council Elected
Members; Commercial and organised groups with an interest in Oban Bay;
Community Councils; 899 individuals within both Oban, Lorn and the Isles
Wards, who have subscribed to the ‘keep in the loop’ subscription service and
was open to the general public via the Argyll & Bute Council website. 
3.1.10 The results have been published on the website (Click here) and are summarised
below: 
Oban Bay as a Municipal Port: Summary of responses from consultation 
Total responses to mail address   65  
Responses supportive of Municipal Port  36 (55.4%)
Responses against Municipal Port  17 (26.1%)
Responses neutral to Municipal Port  12 (18.5%) 
All of the responses were examined and core themes were identified from the
questions, statement and comments. 
The table below summarises those themes and provides a response to each: 
Questions & comments received in the
‘Against’ and ‘Neutral’ categories
(summary)
Response
Does the Oban Bay Management Group
support the Municipal Harbour?
Argyll and Bute Council’s plans for a
Municipal Harbour have the full support of
the Oban Bay Management Group. 
Oban is a distinct and complex harbour;
how can we be confident that Argyll and
Bute Council has the expertise to run it?
Argyll & Bute Council have a Harbour
Master at Oban with a great deal of
experience both in general marine terms
and specifically in managing Oban Bay.
Oban Bay is one of 39 piers and harbours
managed by Argyll & Bute Council,
including five Statutory Harbour Authorities
and one Competent Harbour Authority.
Within the Roads and Infrastructure
Services, the Marine Department have and
Page 11

Page 12

extensive range of experience supported by
(among others) Legal, HR & Technical
Design colleagues. 
What will the staffing be and what hours will
the Harbour operate?
It is envisioned that the Harbour will operate
between 06:00 and 23:00 with up to three
Assistants working with the Harbour Master. 
How will Argyll and Bute Council govern the
harbour and ensure the local community
and stakeholders are involved?
Argyll & Bute Council has Elected Members
directly involved through the transparent
workings of the Harbour Board,
representing not only the local Oban area
but also the wider Islands Communities who
also rely on Oban. There will be the
required and appropriate Harbour User /
Stakeholder Groups which will meet
regularly. 
Will the extra charges discourage visitors
and where will any profits go?
Argyll & Bute Council will receive most of its
income from fees and charges from larger
vessels and CalMac (CFL), whereas locals
and local business will benefit from any
developments made to encourage visitors
to Oban. Conservancy charges etc. made
on non-leisure craft are to cover the costs of
maintaining the port and the duties required
of the Harbour Authority (whomever that
may be) in keeping the Port safe and open
for business. 
Are there any plans for upgrading the port
facilities?
There are plans at an early stage which
look at an extension of the North Pier. The
scope of the proposal would include
extending and strengthening the North Pier
by up to an additional 50m and dredging to
a usable uniform depth of 5m to facilitate
and future proof the berthing face for
commercial customers. The works would
help to ensure a safe and efficient through
traffic management of commercial and
private vehicles using the pier. 
Why do we need any change, surely
existing COLREGS are enough for safety?
The formal management of the larger bay
area allows the Harbour Authority to enforce
legislation (like COLREGS) and other safety
rules (like speed limits). Without the
inclusion of the larger bay area in a new
HRO, there is the possibility of disruption or
incidents which take place outside the
jurisdiction of the existing Authorities. Local
leisure and regular users should not notice
much of a difference in the Day-to-Day
running of the Bay. 
Page 12

Page 13

Will the harbour eventually be transferred to
CMAL or run for the benefit of CalMac
ferries?
Oban Bay is recognised as an important
strategic asset within Argyll & Bute. The
Council will run and maintain Oban Harbour
for the benefit of all users, including CFL
(CalMac) and that after a period of bedding
in, there will be a further report to Members
on the potential for and exploration of the
future development of a 
Trust Port. 
Will small leisure craft still be able to launch
for free and have access to the bay?
Argyll & Bute Council operates an ‘Open
Port’ policy which ensures that safe access
and safe use of our Ports and Harbours is
enjoyed by the public. Leisure craft will be
exempt from Conservancy Fees. 
The Council have been keeping groups and the general public informed through
regular updates on the Argyll & Bute Council website which can be viewed by
using the following link: 
Click here   
Governance arrangements  
3.2.1 The  Council’s Constitution sets out that its functions as a harbour authority are 
carried out by the  Harbour Board which is a committee of the Council consisting
of elected members and is authorised to discharge the powers and duties of the
Council as a Statutory Harbour Authority in respect of general and specific
statutory duties. The Council as the legal body required to exercise the functions
of the harbour authority, is named as the harbour authority within the text of the
draft Order.   
3.2.2 The HRO will designate the Council as the harbour authority for the Harbour.
This designation will not affect CMAL's existing position as harbour authority for
the Railway Pier, nor will it affect the existing rights and duties of the Northern
Lighthouse Board.  
3.2.3 Some of the feedback asked that the Council either manage the harbour area at
Oban through a body named the Oban Harbour Board, or a sub-committee of
the existing Harbour Board named the Oban Advisory Committee with
delegated executive powers and having a membership consisting of 50%
elected members (i.e. councillors) and 50% major stakeholders. 
3.2.4 The feedback also made reference to the Ports Good Governance Guidance,
which is produced by the UK Department of Transport. Part C of that guidance
states that harbour management committees for local authority owned ports
should ideally consist of approximately 50% local authority elected members
and the remainder external appointees.  However, the Department of Transport
states in the guidance it applies to statutory harbour authorities in England and,
Page 13

Page 14

in certain circumstances, Wales. The guidance does not directly reference
Scottish Councils or Statutory Harbour Authorities and is not legally binding.  
3.2.5 The feedback also indicated a desire to have community engagement in the
operation of the harbour. The Harbour Board, in exercise of its functions will
consult with harbour users and other interested groups (including community
groups) on the operation/management and development of Oban harbour. It is
willing to put in place appropriate arrangements to that end. At present, there is
a management committee which the Council uses to consult with other users of
Oban harbour.  
3.2.6 A consultative forum would not have any formal powers over the operation of
Oban harbour so the draft Order cannot make provision for it. The purpose of
the Order is to set out the Council's formal powers as harbour authority over the
Oban harbour area. However, the Council can seek agreement amongst
interested parties as to the arrangements for consultation and can, if
appropriate, set those arrangements out separately in writing.   
Next Steps 
3.2.7 The key statutory and notable milestones for subsequent reports to the Harbour
Board are: 
(1) Any clarifications or amendments requested by Transport Scotland or MCA
will be presented to a further Harbour Board meeting for Members review
and approval.
(2) Advertisement of the application in Edinburgh and local press following
receipt of the HRO by Transport Scotland.
(3) 42 days for formal consultation as per the HRO process.
(4) Addressing any issues and objections.
(5) Decision by Ministers on HRO.
(6) Order is made. 
4.0 CONCLUSION 
4.1 This report provides an update to Members on the status of plans to establish
the Municipal Oban Harbour and the progress of the Oban Harbour Revision
Order (HRO). 
4.2 The HRO includes proposed external Harbour Limits which have been justified
by an independent Navigational Risk assessment (NRA) process. 
5.0 IMPLICATIONS 
5.1 Policy – The Harbour Board agreed in December 2021 that the Council should
proceed to make the arrangements to formally manage the unmanaged
section of Oban Bay.   
Page 14

Page 15

5.2 Financial – No financial implications at this stage.  As the proposal develops
further detail will be brought to the Harbour Board.   
5.3 Legal – the HRO process is a formal legal process set out in the 1964
Harbours Act. 
5.4 HR – HR implications will be identified as the proposal progresses.   
5.5  Fairer Scotland Duty: 
5.5.1   Equalities – None known. 
5.5.2   Socio-economic Duty – None known.
5.5.3 Islands – consultation will continue to include island communities with special
interest and connections with Oban as required by the process.
5.6 Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  
5.7 Risk - The Council progressing to become a Municipal Port Authority for the
unmanaged areas of Oban Bay increases the safety within Oban Bay.  There
is a risk that there could be a number of objections and representations during
the process which could impact on timescale and these will be considered as
and when they arise.  
5.8  Customer Service – Improved and safer environment for all users. 
Kirsty Flanagan, Executive Director with responsibility for Roads and Infrastructure 
Jim Smith, Head of Roads and Infrastructure 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
December 2022 
For further information contact: Jim Smith, Head of Roads and Infrastructure, or
Scott Reid, Marine Operations Manager 
APPENDICES 
Appendix 1. Proposed HRO draft for submission to Transport Scotland 
Appendix 2. Purpose and Effects note
Appendix 3. Proposed external limits to Oban Harbour
Page 15

Page 16

This page is intentionally left blank

Page 17

Appendix 1
61863918v1 
Draft – November 2022
______________________________________________
SCOTTISH STATUTORY INSTRUMENTS
______________________________________
2022 No. [    ]
HARBOURS, DOCKS, PIERS AND FERRIES
The Argyll and Bute Council (Oban) Harbour Revision Order 2022                                       
Made                                                                2022                                      
Coming into force                                              2022       
The Scottish Ministers (the “Ministers”) make the following Order in exercise of the powers conferred by section
14(1), (2A) and (3) of the Harbours Act 1964(1) and all other powers enabling Ministers to do so.
In accordance with section 14(1) of that Act, this Order is made in relation to a harbour which is being improved,
maintained or managed by a harbour Council in the exercise and performance of statutory powers and duties,
for achieving objects specified in Schedule 2 to that Act2.
In accordance with section 14(2) of the Act—
(a) this Order is made following a written application to Ministers by Argyll and Bute Council ("the Council")
being the Council engaged in improving, maintaining or managing the harbour; and
(b)  except in so far this Order is made for achieving objects mentioned in section 14(2A) of the Act,
Ministers are satisfied that the making of this order is desirable in the interests of securing the
improvement, maintenance or management of the harbour in an efficient and economical manner.
In accordance with section 14(2A) of that Act, the objects for achieving which this Order is made include
repealing superseded, obsolete or otherwise unnecessary statutory provisions of local application affecting the
harbour.                                                 
(1) 1964 c.40; section 14 was relevantly amended by the Transport Act 1981 (c.56), schedule 6, paragraphs 2, 3, 4(1) and 14 and schedule 12 and the
Transport and Works Act 1992 (c.42), schedule 3, paragraph 1.  See sections 14(7) and 57(1) of the Harbours Act 1964 for the definitions of “the
appropriate Minister” and “the Minister”.  The functions of the Minister of the Crown were transferred to the Scottish Ministers by virtue of section 53
of the Scotland Act 1998 (c.46).
(2) Schedule 2 was relevantly amended by the Transport and Works Act 1992 (c.42), Schedule 3, paragraph 9.
Page 17

Page 18

2
61863918v1 
[Notice has been published by the Council in accordance with the requirements of paragraph 10 of Schedule
3 of that Act3. No objections to the application have been made.]
[In accordance with paragraph 19(2) of that Schedule4, Ministers have decided to make this Order in the form
of the draft submitted to them.]
PART I
PRELIMINARY 
Citation and commencement
1. This Order may be cited as the Argyll & Bute Council (Oban) Harbour Revision Order 202[x] and comes into
force on the day after the day on which it was made.
Interpretation
2.  In this Order—
“the 1847 Act" means the Harbours, Docks and Piers Clauses Act 18475;
"CMAL" means Caledonian Maritime Assets Limited, a company incorporated in Scotland with registered
number SC001854 and having its registered office at Municipal Buildings, Fore Street, Port Glasgow,
Renfrewshire, PA14 5EQ;
"the Council" means Argyll and Bute Council;
"ferry operator" means the operator (if any), from time to time, of the Clyde and Hebrides Ferry Services
on behalf of the Scottish Ministers;
“general direction” means a direction given by the Council under article 19;
“government department” includes any part of, or any member of the staff of, the Scottish Administration
which shall have the same meaning as in section 126(6) of the Scotland Act 1998;
“harbour” means the harbour at Oban comprised within the harbour limits; 
"harbour limits" means the limits of the harbour as described in article 4 and Schedule 1 to this Order and
shown on the first harbour map;                                                 
(3) Paragraph 10 of Schedule 3 was substituted by S.I. 1999/3445 and is amended by the Transport and Works (Scotland) Act 2007 (asp 8), section
25(5)(b) and (c).  
(4) Paragraph 19(2) of Schedule 3 was substituted by S.I. 1999/3445.
5 1847 c.27.
Page 18

Page 19

3
61863918v1 
"first harbour map" means the map referred to in article 4(1), and forming Schedule 3 to this Order;
"second harbour map" means the map referred to in article 4, and forming Schedule 4 to this Order;
“harbour master” has the definition provided for under section 2 of the 1847 Act; 
“harbour premises” means the quays, berths, piers, pontoons, moorings, landing places, and all other
works, land, buildings and other structures and premises from time to time vested in or occupied or
administered by the Council as part of the harbour undertaking, including the existing works which are all
situated within the harbour limits;
“harbour undertaking” means the harbour undertaking of the Council at Oban;
“land” includes land covered by water, any interest in land and any servitude or right in, to or over land;
“master” in relation to a vessel means any person for the time being having or taking the command, charge
or management of the vessel;
“mooring” includes any buoy, pile, post, chain, pillar, jetty for use as an appurtenance to a dwelling or like
apparatus or structure used for the mooring of vessels;
"railway pier" means the harbour at Oban within the limits defined in Schedule 2 to this order and shown
on the second harbour map
“relevant ferry services” means any services associated with the delivery of the Clyde Hebrides Ferry
Services on behalf of the Scottish Ministers;
“relevant person” in relation to any property, rights or interests to which section 90B(5) of the Scotland Act
1998 applies means the person who manages that property, or those rights and interests;
“special direction” means a direction given by the harbour master under article 21; 
"vessel" means a ship, boat, raft or watercraft of any description however propelled or moved and includes
anything constructed, adapted for or used to vary persons or goods by water or for floating on or being
submerged in water (whether permanently or temporarily) and shall include but not be limited to a
displacement craft, a personal water craft, a sea plane on the surface of the water, a hydrofoil vessel, a
hovercraft or any other amphibious vehicle.
Incorporation of the Harbours, Docks, and Piers Clauses Act 1847
3.—(1) Sections 1 to 4, 34, 35, 37 to 39, 42, 51, 54, 55, 63 to 65 of the 1847 Act are incorporated with this
Order subject to the modifications stated in paragraphs (2) to (4).
(2) In construing the provisions of the 1847 Act as incorporated with this Order—
Page 19

Page 20

4
61863918v1 
(a) the expression “the special Act” means this Order, the expression “the undertakers” means the
Council and the expression “the harbour, dock, or pier” shall mean the harbour; and
(b) for the definition of the word “vessel” in section 3 (interpretations in this and the special Act) there
shall be substituted the definition of that word in article 2;
(c) section 63 shall be read and have effect as if for the words from “be liable to” to the end of the
section there were substituted the words “be guilty of an offence and shall be liable on summary
conviction to a fine not exceeding level 3 on the standard scale”
(d) section 65 (harbour master may remove vessel for purpose of repairing harbour or dock if the
master neglects or refuses to do so) shall have effect subject to the omission of the words from
“Provided always” to the end of the section.
PART II - POWERS
Harbour jurisdiction
4.—(1) The Council shall exercise jurisdiction as a harbour authority within the meaning of section 57 of the
Harbours Act 1964 within the area described in schedule 1 of this Order, and shown on the first harbour map
together with the harbour premises as shown on the first harbour map.
(2) In the event of any discrepancy between the boundaries of the harbour as described in schedule 1 of this
Order and the boundaries shown on the first harbour map, the description shall prevail.
(3) For the avoidance of doubt the Council shall not exercise jurisdiction as a harbour authority within the area
described in schedule 2 of this Order, and shown on the second harbour map. 
General powers and duties in respect of the harbour
5.—(1) The Council may improve, maintain, regulate, manage, mark and light the harbour and provide harbour
facilities therein.
(2) For these purposes and without prejudice to the generality of paragraph (1) the Council may construct,
alter, demolish and reconstruct structures and works in the harbour, subject to having all necessary consents
and the rights over any land required.
(3) This article is without prejudice to any powers of the Council under or by virtue of any other enactment
(including any other provisions within this Order).
Powers with respect to land, buildings, harbour facilities etc.
6.—(1) The Council may for such price and upon such terms and conditions and subject to such restrictions
and for such period as it thinks fit sell, lease, exchange or otherwise dispose of any land, building or harbour
facilities belonging to it which is no longer required by the Council for the purposes of the harbour. 
Page 20

Page 21

5
61863918v1 
(2) The Council may for the purposes of the harbour undertaking manage, use or develop land belonging to it
(whether under its ownership or lease) ,as it thinks fit.
Power to dredge
7.—(1) The Council may from time to time deepen, widen, dredge, scour, cleanse, alter and improve the bed
and foreshore of the harbour and the seaward approaches thereto.
(2) The Council may use, appropriate or dispose of any material (other than any wreck within the meaning of
Part IX of the Merchant Shipping Act 19956) from time to time dredged or removed by it from the harbour.
(3) No dredged materials shall be deposited—
(a) in contravention of the provisions of any enactment as respects the disposal of waste; or
(b) in any place below the level of mean high water springs except in such places and in accordance
with such conditions and restrictions as may be approved or prescribed by the Scottish Ministers.
Restriction of works and dredging
8.—(1) No person other than the Council shall in the harbour—
(a) construct, place, alter, renew or maintain any works; or
(b) dredge,
unless that person has contracted with or been licensed by the Council to do so.
(2) Any person who contravenes this article shall be guilty of an offence and liable on summary conviction to
a fine not exceeding level 3 on the standard scale.
(3) The Council may by notice require a person who contravenes this article to remove, abate or rectify, within
a reasonable time specified in the notice, any work, operation or omission to which the contravention relates
and to restore the site thereof to its former condition; and if that person fails to comply with the notice the
Council may carry out the works so required and may recover from that person as a debt any expenses
incurred by it in doing so.
(4) This article shall not apply to dredging carried out by CMAL, its contractors or agents in the approaches to
the railway pier, but before carrying out any dredging in the approaches to the railway pier, CMAL shall consult
with the Council.
Parking places                                                 
6 1995 c. 21
Page 21

Page 22

6
61863918v1 
9.  The Council may provide facilities within the harbour premises for the parking of vehicles and for that
purpose may erect barricades or fencing with related offices, waiting rooms and other conveniences for the
use of the public, may delineate parking areas, operate access control systems and may make reasonable
charges for the use of such facilities.
Declaration of draught, etc. of vessel
10.—(1) The master of a vessel who in response to a requirement under paragraph (1) without reasonable
excuse fails to give the information or gives incorrect information shall, without prejudice to any right of the
Council to compensation for loss or damage occasioned thereby, be guilty of an offence and liable on summary
conviction to a fine not exceeding level 3 on the standard scale.
(2) For the purposes of this article “draught” in relation to a hovercraft or hydrofoil vessel means its draught
when afloat and not supported on a cushion of air or on foils or by any other means and in relation to a seaplane
means its draught when afloat.
Provisions as to damage
11.—(1) This article applies to any damage caused to any work or property of the Council in the harbour—
(a) by any person who contravenes any provision of this Order or any other enactment relating to the
harbour; or
(b) by a vessel, whether or not as a result of any contravention of any such provision.
(2) Where damage to which this article applies has occurred, the Council may detain any vessel which caused
the damage, and any other property belonging to or in charge of the person who caused the damage, or
belonging to that person’s employers, until the cost of the damage has been paid or until reasonable security
has been given to the Council.
(3) The owner of any vessel causing damage to which this article applies and the master (if it was through his
intentional act or failure to act that the damage was done) shall be liable for the cost of the damage.
(4) This article does not affect—
(a) any right of the owner or master of a vessel to recover the cost of damage from any person whose
act, or failure to act, gave rise to the damage;
(b) any right of the Council under any other enactment, agreement or rule of law; or
(c) the criminal liability of any person under any provision of this Order, or any byelaw made in relation
to the harbour by the Council.
Obstruction of harbour master, etc.
Page 22

Page 23

7
61863918v1 
12.  Any person who intentionally obstructs the harbour master or any other person carrying out duties under
this Order or any enactment relating to the harbour shall be guilty of an offence and liable on summary
conviction to a fine not exceeding level 2 on the standard scale.
Boarding of vessels
13.  The harbour master may enter and inspect a vessel in the harbour, subject to producing his authority
where requested—
(a) for the purposes of any enactment relating to the Council or of any byelaw of the Council relating
to its functions as the harbour authority in respect of the harbour undertaking, including the
enforcement thereof; or
(b) to prevent or extinguish fire,
but, except in an emergency, no entry shall be made under this article without prior written notice first having
been given to the owner or the person appearing to have charge of the vessel, at least 24 hours in advance;
and the written notice shall have annexed to it a copy of this article.
Vessels adrift
14.—(1) The owner or master of a vessel adrift in the harbour shall be guilty of an offence and liable on
summary conviction to a fine not exceeding level 2 on the standard scale.
(2) It shall be a defence for the owner or master of a vessel charged with an offence under paragraph (1) to
prove that the vessel did not become adrift as the result of any neglect or default on the part of that person.
Power to appropriate parts of the harbour, etc.
15.—(1) Subject to paragraph (3) but notwithstanding anything else in this or any other statutory provision of
local application, the Council may from time to time set apart and appropriate any part of the harbour or any
land, works, buildings, machinery, equipment or other property within the harbour owned or managed by the
Council for the exclusive, partial or preferential use or accommodation of any particular trade, activity, person,
vessel or goods or any class of trader, vessel or goods, subject to the payment of such reasonable charges
and to such terms, conditions and regulations as the Council may think fit.
(2) No person or vessel shall, otherwise than in accordance with the setting apart or appropriation, make use
of any part of the harbour, land, works, buildings, machinery, equipment or other property so set apart or
appropriated without the consent of the harbour master, and—
(a) the harbour master may order any person or vessel making use thereof without such consent to
leave or be removed from the site of the contravention; and
Page 23

Page 24

8
61863918v1 
(b) the provisions of section 58 of the 1847 Act shall extend and apply with appropriate modifications
in relation to any such vessel.
(3) In exercising its powers to appropriate or set apart any part of the harbour under paragraph (1), the Council
shall have regard to the facilitation of—
(a) the public right of navigation in the harbour; 
(b) any public rights of way affecting the harbour; and
(c) access to relevant ferry services,
such that the Council shall not restrict such rights more than is necessary for the purpose for which the part of
the harbour is appropriated or set apart.
Power to enter into arrangements to provide supplies
16.  The Council may make arrangements for the purpose of providing and supplying fuel, ice and such other
requirements as may be made available to vessels using the harbour and in respect of the supply, laying down
and maintaining of pipelines, storage tanks, plants, equipment and other apparatus and the execution of
ancillary and necessary works for that purpose within the harbour.
Moorings
17.—(1) The Council may provide, place, lay down, maintain, renew, use or remove such moorings, buoys
and similar apparatus within the harbour as it considers necessary or desirable for the convenience of vessels.
(2) The Council may demand, receive and recover in respect of any vessel using any of the moorings provided
by the Council under paragraph (1), or moored to land owned or leased by the Council, such reasonable
charges as the Council may from time to time prescribe.
(3) The Council may compound with any person with respect to the payment of the charges prescribed under
paragraph (2).
(4) The Council may from time to time grant a licence to any person to place, lay down, maintain, renew and
use moorings, buoys and similar apparatus for vessels in the harbour.
(5) Any person who, without reasonable excuse, places, lays down, maintains, renews or uses a mooring,
buoy or similar apparatus for vessels within the harbour except under and in accordance with the terms and
conditions of a licence granted under this article, shall be guilty of an offence and liable on summary conviction
to a fine not exceeding level 3 on the standard scale.
(6) Any licence granted under paragraph (4) shall be valid only for a period of one year, or such longer period
as seems to the Council to be desirable in the circumstances, commencing with the date on which it takes
effect.
Page 24

Page 25

9
61863918v1 
(7) The Council may charge a reasonable fee for the grant of a licence under this article.
General directions
18.—(1) The Council may after consultation with the Royal Yachting Association, the UK Chamber of Shipping,
CMAL, the Commissioners of Northern Lighthouses, the Maritime and Coastguard Agency and such other
persons as the Council considers are representative of users to the harbour, give directions for any of the
following purposes:—
(a) designating areas, routes or fairways in the harbour which vessels are to use, or refrain from using
for movement, mooring or anchorage;
(b) securing that vessels move only at certain times or during certain periods;
(c) securing that vessels make use of descriptions of aids to navigation specified in the direction;
(d) prohibiting entry into or navigation within any of the main fairways during any temporary obstruction
thereof;
(e) requiring the master of a vessel entering, leaving or intending to enter or leave the harbour to state
the length overall and draught maximum of their vessel;
(f) prohibiting entry into or movement in the harbour by vessels at times of poor visibility due to the
weather or to the presence of dust or smoke provided that no such direction shall prevent the entry
into the harbour or the approaches of any vessel seeking refuge from stress of weather;
(g) regulating the navigation, berthing, mooring and speed of vessels within the harbour;
(h) specifying the precautions to be taken in respect of apparatus, machinery and equipment; 
(i) prohibiting or restricting use of fires or lights;
(j) regulating the admission to, and the movement within, and the departure of vessels from, the
harbour, or the removal of vessels, and for the good order and government of vessels whilst within the
harbour;
(k) regulating the use of ferries within the harbour;
(l) regulating the use within the harbour of yachts, sailing boats, sailboards, rowing boats, rowing punts,
pleasure craft, personal watercraft, tugs and other small craft;
(m) regulating the launching of vessels within the harbour; and
(n) making the carrying out of specified harbour operations, or the conduct of persons in the harbour,
subject to the approval (with or without conditions), control or direction of the harbour master, and for
Page 25

Page 26

10
61863918v1 
authorising the harbour master to take such action as may be reasonably required in default of
compliance with any such condition, control or direction;
(2) A general direction under this article may apply–
(a) to all vessels or to a class of vessels designated, or for which the designation is provided for, in the
direction;
(b) to the whole of the harbour or to a part designated, or for which the designation is provided for, in
the direction; or
(c) at all times or at times designated, or for which the designation is provided for, in the direction,
and every direction under this article shall specify the extent of its application in relation to the matters referred
to in sub-paragraphs (a), (b) and (c).
(3) The Council may after consultation with the Royal Yachting Association, the UK Chamber of Shipping,
CMAL, the Commissioners of Northern Lighthouses, the Maritime and Coastguard Agency and such other
persons as the Council considers are representative of users of the harbour revoke or amend any general
direction. 
Publication of general directions
19.—(1) Except in an emergency, the Council shall publish notice of the giving of a general direction and of
any amendment or revocation of a general direction as soon as practicable once in a newspaper circulating in
the locality of the harbour, and on a website maintained by the Council, and, if the notice relates to the giving
or amendment of a general direction, the notice shall state a place at which copies of the general direction or
the amended general direction (as the case may be) may be inspected and bought, and the price of the general
direction or amended general direction (as the case may be).
(2) In an emergency, notice of the giving of a general direction or of the amendment or revocation of a general
direction may be given in any manner considered by the Council to be appropriate.
Special directions to vessels
20.—(1) The harbour master may give a special direction under this article—
(a) requiring a vessel anywhere within the harbour to comply with a requirement made in or under a
general direction;
(b) regulating the time at which, the manner in which and speed at which a vessel shall enter into, go
out of, move within or lie in or at the harbour;
(c) for securing that a vessel move only at certain times or during certain periods;
Page 26

Page 27

11
61863918v1 
(d) prohibiting the mooring of a vessel in any particular part or parts of the harbour;
(e) regulating or requiring the movement, mooring or unmooring of a vessel; 
(f) regulating the manner in which a vessel takes in or discharges (from ship to shore or shore to ship
or ship to ship) passengers, cargo, fuel, water, ship’s stores or ballast in the harbour; and
(g) requiring the removal from any part of the harbour of a vessel if—
(i) it is on fire;
(ii) it is in such condition as to be liable to become immobilised or waterlogged, or to sink, or
to constitute a danger to life (including wildlife) or property;
(iii) it is making an unlawful use of the harbour or interfering with the reasonable use or
enjoyment of the harbour by other vessels or persons;
(iv) its removal is necessary to enable maintenance or repair work to be carried out at harbour
premises or to premises adjacent thereto.
(2) A special direction may be given in any manner considered by the harbour master to be appropriate.
(3) The harbour master may revoke or amend a special direction.
Failure to comply with special directions
21.  The master of a vessel who fails without reasonable excuse to comply with a special direction shall be
guilty of an offence and liable on summary conviction to a fine not exceeding level 4 on the standard scale.
Enforcement of special directions
22.—(1) Without prejudice to any other remedy available to the Council, if a special direction is not complied
with within a reasonable time, the harbour master may, where practicable, put persons on board the vessel to
carry out the direction or may otherwise cause the vessel to be handled in accordance with the direction.
(2) If there is no-one on board a vessel to comply with a special direction, the harbour master may proceed as
if the direction had been given and not complied with; but the harbour master shall not do so unless, after
reasonable enquiry has been made, the master of the vessel cannot be found.
(3) Reasonable expenses incurred in the exercise of the powers conferred by this article shall be recoverable
by the Council from the owner of the vessel as if they were a charge of the Council in respect of the vessel.
Master’s responsibility in relation to directions
Page 27

Page 28

12
61863918v1 
23.  The giving of a general direction or a special direction shall not diminish or in any other way affect the
responsibility of the master of the vessel to which the direction is given in relation to that vessel, persons on
board, its cargo or any other person or property.
Removal of obstructions other than vessels, vehicles or wreck
24.—(1) The Council may remove anything which is causing or likely to become an obstruction or impediment
to the proper use of any part of the harbour other than—
(a) a vessel or vehicle; or
(b) a wreck within the meaning of Schedule 11ZA of the Merchant Shipping Act 1995.
(2) If anything removed by the Council under paragraph (1) is known to the Council to be, or is so marked as
to be readily identifiable as, the property of any person, the Council shall within one month of its coming into
its custody give notice, in accordance with paragraph (6), to that person and if possession of the thing is not
retaken within the period specified in, and in accordance with the terms of, the notice it shall at the end of that
period become the property of the Council.
(3) If the ownership of anything removed by the Council under paragraph (1) is not so known or marked and
the ownership cannot within 3 months of its coming into the custody of the Council be proved to the Council’s
reasonable satisfaction, it shall become the property of the Council.
(4) The Council may at such time and in such manner as it thinks fit dispose of anything which is of a perishable
or obnoxious nature or the custody of which involves unreasonable expense or inconvenience notwithstanding
that it has not vested in the Council under this article, and if it is sold the proceeds of sale shall be applied by
the Council in payment of the expenses incurred by it under this article in relation to the thing, and any balance–
(a) shall be paid to any person who within 3 months from the time when the thing came into custody
of the Council proves to its reasonable satisfaction that such person was the owner thereof at that
time; or
(b) if within the said period no person proves ownership at the said time, shall become the property of
the Council.
(5) If anything removed under this article—
(a) is sold by the Council and the proceeds of sale are insufficient to reimburse it for the amount of the
expenses incurred in the exercise of its powers of removal; or
(b) is unsaleable,
Page 28

Page 29

13
61863918v1 
the Council may recover the deficiency or the whole of the expenses, as the case may be, from the person
who was the owner when the thing removed came into the custody of the Council or who was the owner at the
time of its abandonment or loss.
(6) A notice given under paragraph (2) shall specify the thing removed and state that upon proof of ownership
to the reasonable satisfaction of the Council, possession may be retaken at a place specified in the notice
within the time specified therein, being not less than 14 days after the date when the notice is served.
(7) The Council shall not under the powers of this article move anything placed or constructed by any person
under the provisions of any enactment or of a consent or licence.
Power to remove goods
25.—(1) If any goods are left on or in any part of the harbour premises the Council may require the owner of
the goods to remove them; and if the goods are not so removed within six hours after such requirement the
Council may cause them to be removed to the Council or any other public warehouse or store; and such
removal shall be carried out at the expense and risk of the owner.
(2) Notwithstanding such removal on behalf of the Council, the goods shall be subject to a lien for the cost of
removal, and for any charges payable to the Council by the owner in respect of the goods under Part III
(Charges) of this Order.
(3) In this article, “goods” includes equipment of any description.
Powers to make byelaws, etc.
26.—(1) The Council may from time to time make byelaws for the efficient management and regulation of the
harbour.
(2) Without prejudice to the generality of paragraph (1), byelaws made under this article may provide for—
(a) regulating the use, operation and superintendence of the harbour and the docks, berths, wharves,
quays, piers, jetties, landing places, equipment, works and conveniences (including moorings);
(b) regulating the shipping and unshipping, landing, warehousing, stowing, depositing and removing
of goods, including marine creatures of any type, within the harbour;
(c) preventing damage or injury to any vessels, goods, vehicles, plant, machinery, property or persons
within the harbour;
(d) regulating the conduct of all persons in the harbour not being members of a police force or officers
or servants of the Crown whilst in the exercise of their duties;
(e) preventing and removing obstructions or impediments within the harbour;
Page 29

Page 30

14
61863918v1 
(f) regulating the holding of regattas and other public events in the harbour;
(g) regulating or prohibiting the activities in the harbour of divers, surfers, water skiers and other
persons engaged in similar recreational pursuits;
(h) prohibiting persons in or entering the harbour, or any part thereof, from smoking therein;
(i) regulating the movement and parking of vehicles within the harbour;
(j) regulating the exercise of the powers vested in the harbour master, as provided for in the 1847 Act,
this Order and any other relevant enactment;
(k) regulating the hours during which any gates, entrances or outlets to or from the harbour or any part
of the harbour shall be open;
(l) prohibiting or regulating the discharge or deposits of ballast, ashes, refuse, rubbish or other material
(including any polluting liquid) into or upon the harbour;
(m) regulating the use of cranes, weighing machines, weights and measures belonging to the Council,
and the duties and conduct of weighers and meters employed by the Council;
(n) regulating the holding of regattas and other public events in the harbour;
(o) regulating or preventing the use of fires and lights within the harbour;
(p) the conservation of the natural beauty of all or any part of the harbour or of any of the fauna, flora
or geological or physiographical features in the harbour and all other natural features; and
(q) the conservation, preservation or redevelopment of any buildings, plant or other artificial features
of the harbour of historic or architectural significance.
(3) Byelaws made under this article may—
(a) provide for imposing upon persons found guilty on summary conviction of offending against them,
or against any condition, requirement or direction imposed, made or given thereunder on summary
conviction, fines not exceeding level 3 n the standard scale;
(b) relate to the whole of the harbour or harbour premises, or to any part thereof; or
(c) make different provisions for different parts of the harbour or harbour premises, or in relation to
different classes of vessels.
(4) Existing byelaws in respect of the harbour will remain in place as if they had been made under this order.
Confirmation of byelaws
Page 30

Page 31

15
61863918v1 
27.—(1) Byelaws made by the Council under this Order shall not come into operation until they have been
confirmed by the Scottish Ministers.
(2) At least one month before an application for confirmation of byelaws is made by the Council to the Scottish
Ministers, notice of the intention to apply for confirmation and of the place at which and times during which a
copy of the byelaws shall be open to inspection shall be published as follows—
(a) once in the Edinburgh Gazette; and
(b) once in each of two successive weeks in a newspaper circulating in the area in which the harbour
is situated.
(3) During a period of at least one month before application is made for confirmation of the byelaws, a copy of
the byelaws shall be kept by the Council at the principal office of the Council and at the harbour office and will
be available for inspection without payment.
(4) The Council shall supply a copy of the byelaws or of part of the byelaws to a person who shall apply for it.
(5) During the period of one month after the date of first publication of any notice required by paragraph (2),
any person may make in writing to the Scottish Ministers any objection to or representation respecting the
byelaws to which the notice relates.
(6) Subject to paragraph (7), the Scottish Ministers may confirm the byelaws in the form submitted to them
with such modifications as they think fit or may refuse to confirm them.
(7) Where the Scottish Ministers propose to make a modification that appears to them to substantially affect
the character of the byelaw they shall inform the Council and require it to take any steps the Scottish Ministers
consider necessary for informing persons likely to be concerned with the modification, and the Scottish
Ministers shall not make decision under paragraph (6) until such period has elapsed as the Scottish Ministers
think reasonable for consideration of, and comment upon, the proposed modification by the Council and by
other persons who have been informed of it.
(8) In making a decision under paragraph (6) the Scottish Ministers shall have regard to any comments that
may have been received under paragraph (7).
(9) A copy of the byelaws when confirmed shall be printed and deposited by the Council at the principal office
of the Council and shall at all reasonable hours be open to public inspection without payment, and a copy of
the byelaws shall on application be furnished to any person on request.
PART III CHARGES
Charges other than ship, passenger and goods dues
Page 31

Page 32

16
61863918v1 
28.—(1) The Council may demand, take and recover in respect of any dracone or floating dock, crane, rig,
drilling rig or floating plant, which is not a ship as defined by section 57 of the Harbours Act 1964, entering,
using or leaving the harbour such reasonable charges as it thinks fit, and sections 30 and 31 of that Act shall
with any necessary modifications apply to the charges authorised by this paragraph as they apply to ship,
passenger and goods dues.
(2) The Council may make such reasonable charges for services and facilities provided by it or on its behalf in
relation to the harbour as it may from time to time determine.
(3) In paragraph (2) “charges” does not include ship, passenger and goods dues as defined by section 57 of
the Harbours Act 1964.
Liability for charges
29.—(1) Charges payable to the Council on or in respect of—
(a) a vessel, shall be payable by the owner or master of the vessel;
(b) goods, shall be payable by the owner, consignee or shipper of the goods.
(2) Where a charge payable to the Council may be recovered from more than one person the persons from
whom it is recoverable shall be jointly and severally liable.
Power to grant exemptions, rebates, etc., in respect of charges
30.—(1) The Council may confer total or partial exemptions from, allow rebates to or make compositions with
any person with respect to charges, and may vary or extinguish any such exemption or composition.
(2) Nothing in section 30 of the Harbours Act 1964 shall require the Council to include in the list of ship,
passenger and goods dues kept at the harbour office, as required by subsection (1) of that section, charges
reduced by a rebate allowed on, or subject to a compounding arrangement in respect of, a due included in the
said list.
Account of goods
31.—(1) When goods are to be unshipped within the harbour the master of the vessel containing them shall—
(a) within 24 hours of the arrival of the vessel within the harbour, deliver to the harbour master the
name of the consignee of the goods and a copy of the bill of lading or manifest or, if part only of the
cargo is to be unshipped, a sufficient account in writing of the goods to be unshipped;
(b) if required so to do by the harbour master, give to the harbour master 12 hours’ notice of the time
at which any such goods are to be unshipped.
Page 32

Page 33

17
61863918v1 
(2) If any difference arises between the harbour master and a master or the owner of goods or consignee
concerning the weight or quantities of goods in respect of which charges may be payable, the harbour master
may cause the goods to be weighed or measured and may detain a vessel containing such goods until the
goods have been so weighed or measured.
(3) Any person who contravenes or fails to comply with the provisions of paragraph (1)(a) or (2), or with any
requirement made under paragraph (1)(b), shall be guilty of an offence and liable on summary conviction to a
fine not exceeding level 3 on the standard scale.
Security for charges
32.  The Council may require a person who incurs or is about to incur a charge to deposit with it, or to
guarantee, such sum of money as is, in the opinion of the Council, reasonable having regard to the amount or
probable amount of the charge, and where such a person fails to deposit or guarantee the sum of money
required the Council may detain the vessel in the harbour or goods on or in harbour premises, in respect of
which the charge has been or will be incurred, until the requirement has been complied with or the charge
paid.
Liens for charges
33.—(1) A person who by agreement with the Council collects charges on its behalf and who pays or gives
security for the payment of charges on goods in that person’s possession shall have a lien on those goods for
the amount paid or security given in respect of the amount.
(2) A wharfinger or carrier who is not liable for the payment of charges may pay or by agreement with the
Council give security for charges on goods in its custody, and in that event it shall have a like lien on the goods
for the amount of those charges as it would have in respect of its charges for safe custody or carriage of the
goods, as the case may be.
Refusal to pay charges for landing place, etc.
34.  An officer of the Council may prevent a vessel from using a landing place or any other facilities provided
by the Council, if the master of the vessel refuses to pay the charges for such use.
Exemptions from charges
35.—(1) Except in so far as may be agreed between the Council and the government department or person
concerned or as may be specifically laid down by statute, nothing in any enactment authorising the Council to
levy charges shall extend to authorise it to levy charges on—
(a) a vessel—
(i) belonging to or in the service of His Majesty or any member of the Royal Family; or
Page 33

Page 34

18
61863918v1 
(ii) in the service of the Commissioners of Customs and Excise and not carrying goods for
reward; or
(iii) in the service of the Commissioners of Northern Lighthouses and not carrying goods for
reward; or
(iv) belonging to or used by the lifeboat service whilst employed in or in connection with the
functions of that service;
(b) the Commissioners of Customs and Excise in respect of a vessel or goods under customs seizure;
(c) troops landed at the harbour premises or a person employed by the Secretary of State for Defence
while in the execution of his duty;
(d) goods or stores belonging to the Secretary of State for Defence.
(2) Officers of the Department for Transport and of the Scottish Ministers in the execution of their duty shall at
all times be exempt from charges in respect of their vessels and otherwise.
(3) This Order shall not extend to subject any person to liability for charges in respect of a vessel which merely
passes through the limits of the harbour without mooring or making use of any facilities provided by the Council.
Conditions as to payment of charges
36.—(1) Charges shall be payable subject to such terms and conditions as the Council may from time to time
specify in its published list of charges.
(2) Without prejudice to the generality of paragraph (1) the terms and conditions may prescribe the time when
a charge falls due for payment and may require such information to be given to the Council by the owner or
master of a vessel or a person using a service or facility of the Council as the Council may require in connection
with the assessment or collection of a charge.
PART IV MISCELLANEOUS
Reserve funds
37.—(1) If in respect of any financial year the moneys received by the Council on account of the revenue of
the harbour undertaking exceed the moneys expended or applied by it in respect thereof, the Council may in
respect of that year carry to the credit of a reserve fund in respect of the harbour undertaking such a sum as
it considers reasonable not exceeding the amount of such excess.
(2) Moneys for the time being standing to the credit of the reserve fund may be invested in any securities in
which officers are for the time being authorised to invest moneys including debenture stock or other security
created by the Council.
Page 34

Page 35

19
61863918v1 
(3) Any reserve fund provided under this article may be applied—
(a) in making good to the regional rate fund any deficiency at any time arising in the income of the
Council from the harbour undertaking;
(b) in meeting any extraordinary claim or demand at any time arising against the Council in respect of
the harbour undertaking;
(c) in defraying any expenditure in connection with the harbour undertaking for which capital is properly
applicable or in providing money for repayment of loans;
(d )in defraying expenditure to be incurred from time to time in repairing, maintaining, replacing and
renewing buildings, works, plant, vessels, equipment or articles forming part of the harbour
undertaking; or
(e) for any purpose which in the opinion of the Council is desirable in the interests of securing the
improvement, maintenance or management of the harbour in an efficient and economical manner or
of facilitating the efficient and economic transport of goods or passengers by sea to or from the
harbour.
(4) The Council may exercise the powers of this article so as to provide a combined reserve fund in respect
both of the harbour undertaking and any other similar undertaking of the Council, and the foregoing provisions
of this article as to a reserve fund shall apply with all necessary modifications to any such combined reserve
fund.
(5) Any monies held in any combined reserve fund referred to in paragraph 4 may be applied for the purposes
of any of the Council’s harbour undertakings.  
Saving for Commissioners of Northern Lighthouses
38.—(1)Nothing in this Order shall prejudice or derogate from any of the rights, duties, or privileges of the
Commissioners of Northern Lighthouses. (2) Where any exercise by the Council of its powers under article 5
(power to maintain etc. the harbour), article 7 (power to dredge), article 18 (general directions) or article 26
(power to make byelaws) is likely to affect materially on the regular operations of the Commissioners of
Northern Lighthouses, the Council shall, prior to exercising such powers, consult with the Commissioners of
Northern Lighthouses and shall have due regard to any representations made by the Commissioners of
Northern Lighthouses. 
(3) For the avoidance of doubt, this Order does not affect the exercise or existence of any power, duty or right
held by the Commissioners of Northern Lighthouses to maintain aids to navigation within the harbour. 
Saving for CMAL and ferry operator
39.—(1) Nothing in this order shall prejudice or derogate from any of the rights, duties, or privileges of CMAL.
Page 35

Page 36

20
61863918v1 
(2) Where any exercise by the Council of its powers under article 4 (power to maintain etc. the harbour), article
7 (power to dredge), article 18 (general directions) or article 26 (power to make byelaws) is likely to impact
materially on the regular operations of CMAL or the ferry operator within the harbour limits in connection with
the operation of the relevant ferry services, within the harbour limits, the Council shall, prior to exercising such
powers, consult with CMAL and the ferry operator and shall have due regard to any representations made by
CMAL and/or the ferry operator.
Crown rights
40.—(1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of
the Crown and in particular and without prejudice to that generality, nothing in this Order authorises the Council
to take, use, enter upon or in any manner interfere with any land or any rights of whatsoever description
(including any portion of the shore or bed of the sea or any river, channel, creek, bay or estuary)—
(a) belonging to His Majesty in right of the Crown and forming part of the Crown Estate without the
consent in writing of Crown Estate Scotland;
(b) belonging to His Majesty in right of the Crown and not forming part of the Crown Estate without the
consent in writing of the government department having management of that land or (as the case may
be) the relevant person; or
(c) belonging to a government department or held in trust for His Majesty for the purposes of a
government department without the consent in writing of that government department.
(2) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions; and shall
be deemed to have been given in writing where it is sent electronically.
Repeal
41.  The enactment mentioned in the first and second columns of schedule 5 is repealed to the extent specified
in the third column of that schedule.  
Page 36

Page 37

21
61863918v1 
SCHEDULE 1 – HARBOUR LIMITS  
Page 37

Page 38

22
61863918v1 
SCHEDULE 2 – RAILWAY PIER LIMITS  
Page 38

Page 39

23
61863918v1 
SCHEDULE 3 – FIRST HARBOUR MAP  
Page 39

Page 40

24
61863918v1 
SCHEDULE 4 – SECOND HARBOUR MAP  
Page 40

Page 41

25
61863918v1 
SCHEDULE 5 – REPEALS and REVOCATIONS 
Number Short title Extent and time of repeal or
revocation
[ ]
[ ]
[ ]
Pier and Harbour Orders
Confirmation Act 1862
Pier and Harbour Orders
Confirmation Act 1864
Piers and Harbour Orders
Confirmation (No.5) Act,
1896
Articles [   ] 
Articles [ ]
Articles 2, 4 – 28, 30 – 59
and First and Second
Schedules in so far as
applicable to the harbour.   
Page 41

Page 42

26
61863918v1 
EXPLANATORY NOTE
This Order updates the existing legislation for Oban harbour in line with the current needs of Argyll and Bute
Council as the harbour authority for Oban harbour and Oban harbour users from the date it comes into force.
This Order also repeals those parts of the Pier and Harbour Orders Confirmation Act 1862, the Pier and
Harbour Orders Confirmation Act 1864, and the Piers and Harbour Orders Confirmation (No.5) Act, 1896
which are no longer relevant. 
Page 42

Page 43

Appendix 2
63594302v1 
PURPOSE AND EFFECT NOTES – OBAN HARBOUR REVISION ORDER 2022
PART I – PRELIMINARY
1 Article 1 – Citation and commencement
Article 1 provides that the Order may be cited as the Oban Harbour Revision Order 2022 and comes
into force on the day after the day on which it was made.
2 Article 2 – Interpretation
Article 2 provides interpretation of defined terms within the Order.
3 Article 3 – Incorporation of the Harbours, Docks and Piers Clauses Act 1847
Article 3 incorporates selected clauses of the Harbours, Docks and Piers Clauses Act 1847 ("the 1847
Act").
PART II – POWERS
4 Article 4 – Harbour jurisdiction
4.1 Article 4(1) provides for the Council to exercise jurisdiction as harbour authority within the harbour's
bounds as described within Schedule 1 of the Order.
4.2 Article 4(2) provides that the description of the boundaries of the harbour as contained within Schedule
1 shall prevail over those shown on the first harbour maps in the event of any discrepancy.
4.3 Article 4(3) provides that the Council shall not exercise jurisdiction as a harbour authority within the
area described within Schedule 2 of the Order.
5 Article 5 – General powers and duties in respect of the harbour
5.1 Article 5(2) provides for the Council to exercise certain general powers within the harbour, and to
provide harbour facilities.
5.2 Article 5(2) provides that the Council may carry out works (including the construction, alteration,
demolition and reconstruction of structures) within the harbour bounds, subject to possession of all
required consents and heritable rights.
5.3 Article 5(3) provides that the provisions of Article 5 are without prejudice to any other statutory powers
of the Council.
Page 43

Page 44

2
63594302v1 
6 Article 6 – Powers with respect to land, buildings, harbour facilities etc.
6.1 Article 6(1) provides that the Council may dispose of property belonging to it which is no longer
required for the purposes of the harbour, for such price and upon such terms and conditions as it sees
fit.
6.2 Article 6(2) provides that the Council may utilise land either belonging to it or leased by it for the
purposes of the harbour undertaking.
7 Article 7 – Power to dredge
7.1 Article 7(1) provides that the Council may dredge the bed, foreshore, and seaward approaches of the
harbour, and undertake related activities.
7.2 Article 7(2) provides for the disposal of material by the Council dredged or removed from the harbour.
7.3 Article 7(3) places limitation on the disposal and placement of dredged materials.
8 Article 8 – Restriction of works and dredging
8.1 Article 8(1) provides that no person other than the Council shall construct, place, alter, renew or
maintain any works or dredge in the harbour unless contracted or licensed by the Council to do so.
8.2 Article 8(2) provides that any person who contravenes Article 8(1) shall be guilty of an offence.
8.3 Article 8(3) provides that the Council may require a person who contravenes Article 8(1) to remove,
abate or rectify the work and restore the site to its former condition. Failure to do so will allow the
Council to carry out the rectification themselves and recover the expenses of doing so.
8.4 Article 8(4) provides that Article 8(1) shall not apply to dredging carried out by CMAL or its contractors
or agents. CMAL shall consult with the Council before carrying out any dredging.
9 Article 9 – Parking places
Article 9 provides that the Council may provide facilities within the harbour premises, and may make
reasonable charges for the use of such facilities.
10 Article 10 – Declaration of draught, etc. of vessel
10.1 Article 10(1) provides that the master of a vessel who fails to provide such information as required, or
provides incorrect information, without reasonable excuse, is guilty of an offence.
10.2 Article 10(2) provides for interpretation of the term "draught".
Page 44

Page 45

3
63594302v1 
11 Article 11 – Provisions as to damage 
11.1 Article 11(1) provides that Article 11 applies to damage caused to any work or property of the Council
in the harbour by persons contravening a provision of the Order or any other harbour enactment, or
by a vessel.
11.2 Article 11(2) provides that the Council may detain a vessel causing damage or any property belonging
to a person who causes damage, or that person's employers, until the cost of the damage has been
paid, or security provided to by the Authority.
11.3 Article 11(3) provides that the owner of any vessel and the master (where the damage was caused
through his fault) shall bear liability for the cost of the damage.
11.4 Article 11(4) states that Article 11 does not affect certain rights of owners or masters of vessels, the
Council, or criminal liability under the Order or other harbour enactment is guilty of an offence.
12 Article 12 – Obstruction of harbour master, etc.
Article 12 provides that any person who intentionally obstructing the harbour master or other person
carrying out duties under the Order or other harbour enactment is guilty of an offence.
13 Article 13 – Boarding of vessels
Article 13 provides for the harbour master to enter and inspect vessels within the harbour for certain
purposes, with prior written notice having been given at least 24 hours in advance.
14 Article 14 – Vessels adrift
Article 14 provides that the owner or master of a vessel adrift in the harbour is guilty of an offence. It
also provides that it shall be a defence for the owner or master to prove that the vessel did not become
adrift as a result of any fault of that person.
15 Article 15 – Power to appropriate parts of the harbour, etc.
15.1 Article 15(1) provides that the Council may appropriate any part of the harbour or property within the
harbour that is owned or managed by the Council for certain purposes, subject to payment of
reasonable charges and terms, conditions and regulations as the Council sees it.
15.2 Article 15(2) provides that no person or vessel may make use of the harbour or property which has
been so appropriated without the consent of the harbour master, other than in accordance with the
appropriation, and provides that the harbour master may order such person or vessel to leave or be
removed. Section 58 of the 1847 Act applies in respect of such vessels.
15.3 Article 15(3) provides that the Council must have regard to the public right of navigation in the harbour,
any public rights of way affecting the harbour, and access to relevant ferry services where exercising
Page 45

Page 46

4
63594302v1 
its powers under Article 15(1). Any restriction of such rights should be no more than is necessary for
the purpose of the appropriation.
16 Article 16 – Power to enter into arrangements to provide supplies
Article 16 provides that the Council may enter into arrangements for the provision of supplies to vessels
using the harbour, and to lay down such apparatus as may be required for that purpose.
17 Article 17 – Moorings
Article 17 provides for the Council to place such moorings or buoys as it considers necessary or
desirable within the harbour. It provides that the Council may recover reasonable charges in respect
of the use by a vessel of any such moorings. Provision is also made for the granting of licences for the
placing, maintenance etc. of moorings subject to reasonable fees and to a time period of one year or
such period as the Council considers may in the circumstances be desirable, and that any person
doing so without a licence is guilty of an offence.
18 Article 18 – General directions
Article 18 provides that the Council, after consultation with the Royal Yachting Association, the UK
Chamber of Shipping, CMAL, the Commissioners of Northern Lighthouses, the Maritime and
Coastguard Agency, and other harbour users, gives directions for certain purposes and as applying to
all or certain classes of vessels, for all or part of the harbour and at all or at specified times. Provision
is also made for the revocation of any such directions after consultation with the aforementioned
organisations and harbour users.
19 Article 19 – Publication of general directions
Article 19 provides for the publication of notice of general directions, and the amendment or revocation
of the same, in a newspaper circulating in the locality of the harbour and on a website maintained by
the Council.
20 Article 20 – Special directions to vessels
Article 20 provides that the harbour master may give special directions in respect of specific vessels
for certain purposes.
21 Article 21 – Failure to comply with special directions
Article 21 provides that a master of a vessel who fails to comply with a special direction without
reasonable excuse is guilty of an offence.
Page 46

Page 47

5
63594302v1 
22 Article 22 – Enforcement of special directions
Article 22 makes provision as to enforcement of special directions by the harbour master, and for
recovery of reasonable expenses by the Authority in respect of said enforcement.
23 Article 23 – Master's responsibility in relation to directions
Article 23 provides that the giving of general or special directions does not diminish or affect the
responsibility of the master of the vessel in respect of the vessel, person on board, its cargo or any
other person or property. 
24 Article 24 – Removal of obstructions other than vessels, vehicles or wreck
Article 24 makes provision as to the removal of items causing or likely to become an obstruction to the
proper use of any part of the harbour, where those items are not a vessel or vehicle, or a wreck.
Provision is made as to the return of any such items to their owners as may be marked as such or
known to the Council. Provision is made for any such items where ownership is not proven or known
to become property of the Council. Provision is made for the disposal of items of a specified nature by
the Council, and the recovery of the expense of removing the item from the owner of the item.
25 Article 25 – Power to remove goods
Article 25 makes provision for the Council to require the owner of goods left within the harbour
premises to remove them, and where the goods are not so removed by the owner, to remove them.
The expenses and risk of any such removal shall be borne by the owner of the goods. Provision is
made for such goods to be subject to a lien for the cost of removal and any charges payable to the
Council under Part III of the Order.
26 Article 26 – Power to make byelaws, etc.
Article 26 provides that the Council may make byelaws for the efficient management and regulation of
the harbour, and for specified purposes. Provision is made for byelaws to impose penalties upon
persons found guilty of offending against the provisions of those byelaws. Existing byelaws are to
remain in place.
27 Article 27 – Confirmation of byelaws
27.1 Article 27(1) provides that byelaws must be confirmed by the Scottish Ministers before they may come
into operation.
27.2 Article 27(2) – (5) makes provision for the notification of byelaws within the Edinburgh Gazette and a
local newspaper, and for the notification of objections or representations to the Scottish Ministers.
Page 47

Page 48

6
63594302v1 
27.3 Article 27(6) – (9) provides for the confirmation of the byelaws by the Scottish Ministers, subject to any
modification as they see fit, or their refusal. Where the Scottish Ministers propose any modification,
they must notify the Council and require the Council to notify any persons concerned with the
modification. In doing so, the Scottish Ministers must allow time for any comments to be made in
respect of the modification and shall have regard to any such comments. Once confirmed, any byelaws
shall be made available by the Council for inspection without payment.
PART III – CHARGES
28 Article 28 – Charges other than ship, passenger and goods dues
Article 28 provides that the Council may make reasonable charges in respect of objects such as
dracone, floating docks, cranes, rigs, drilling rigs, or floating plants, which are not ships, entering, using
or leaving the harbour. The Council may make such reasonable charges for services and facilities
provided by it in relation to the harbour, where such charges are not ships, passenger or goods dues
as defined by section 57 of the Harbours Act 1964.
29 Article 29 – Liability for charges
Article 29 provides that charges payable to the Council are payable by the owner or master of the
vessel, in respect of a vessel or the owner, consignee or shipper of goods, in respect of goods. Where
a charge payable to the Council may be recovered from more than one person, such persons shall be
jointly and severally liable. 
30 Article 30 – Power to grant exemptions, rebates., in respect of charges
Article 30 permits the Council to grant exemptions (where total or partial) to allow rebates or make
compositions in respect of any person with respect to charges. Such arrangements do not require to
be required to be entered onto the list of ship, passenger and goods dues kept at the harbour office.
31 Article 31 – Account of goods
Article 31 requires the master of a vessel with goods to be unshipped or shipped within the harbour to
provide an account of such goods or bill of lading or manifest. In respect of goods which are to be
unshipped within the harbour the master must additionally provide the name of the consignee of the
goods, along with the time such goods are to be unshipped. Provision is made for the resolution of
disputes as to the weight or quantities of such goods in respect of which charges may be payable. A
person who fails to comply with any part of the provisions of Article 31 is guilty of an offence.
32 Article 32 – Security for charges
Article 31 provides that the Council may require the deposit or guarantee of a sum of money as security
in respect of charges which are incurred or are about to be incurred by a person. Where such deposit
Page 48

Page 49

7
63594302v1 
or guarantee is not made, the Council may detain the vessel or goods in the harbour or harbour
premises until the deposit or guarantee is made or until the charge is paid.
33 Article 33 – Liens for charges
Article 33 makes provision for a right of lien in respect of certain persons.
34 Article 34 – Refusal to pay charges for landing place, etc.
Article 34 provides that the Council may prevent a vessel from using facilities provided by the Council
where the master of the vessel refuses to pay charges.
35 Article 35 – Exemptions from charges
Article 35 provides for exemptions from charges levied by the Authority in respect of certain categories
of vessels, passengers or goods, or officers of the Department of Transport or Scottish Ministers in
execution of their duty.
36 Article 36 – Conditions as to payment of charges
Article 36 provides that the Council may specify terms and conditions in respect of the payment of
charges, including the time when the charge falls due for payment and the provision of information to
the Council.
PART IV – MISCELLANEOUS
37 Article 37 – Reserve funds
Article 37 provides that the Council may carry a reasonable amount forward to the reserve fund if the
revenue generated by the harbour exceeds the expense of it in any financial year.
38 Article 38 – Saving for Commissioners of Northern Lighthouses
Article 38 provides a saving in respect of the provisions of the Order for the rights, duties and privileges
of the Commissioner of Northern Lighthouses, and provides that the Council must consult with the
Commissioners when the Council seeks to exercise its powers under articles 5, 7, 18 or 26 in a manner
that is likely to materially affect the Commissioners' regular operations.
39 Article 39 – Saving for CMAL and ferry operator
Article 39 provides a saving in respect of the provisions of the order for the rights, duties and privileges
of CMAL, and provides that the Council must consult with the Commissioners when the Council seeks
to exercise its powers under articles 5, 7, 18 or 26 in a manner that is likely to materially affect the
Commissioners' regular operations. 
Page 49

Page 50

8
63594302v1 
40 Article 40 – Crown rights
Article 40 provides a saving in respect of the provisions of the Order for the estate, right, power,
privilege, authority or exemption of the Crown. It provides that any land or rights of whatsoever
description belonging to His Majesty in right of the Crown or held by a government department or held
in trust for His Majesty for the purposes of a government department shall not be interfered with by
the Authority without consent in writing from Crown Estate Scotland, relevant government department
or relevant person.
41 Article 41 Repeal
Article 45 specifies the enactments that the enactments mentioned in Schedule 5 to the Order are
repealed to the extent specified in that same schedule.
SCHEDULE 1 – HARBOUR LIMITS
Schedule 1 specifies the limits of the harbour.
SCHEDULE 2 – RAILWAY PIER LIMITS
Schedule 2 specifies the limits of the railway pier, which is not subject to the Council's jurisdiction as harbour
authority under this Order.
SCHEDULE 3 – FIRST HARBOUR MAP
Schedule 3 contains a map showing the boundaries of the harbour.
SCHEDULE 4 – SECOND HARBOUR MAP
Schedule 4 contains a map showing the boundaries of the railway pier.
SCHEDULE 5 – REPEALS AND REVOCATIONS
Schedule 5 specifies the enactments subject to repeal and the extent of such repeal.
Page 50

Page 51

Oban Bay Proposed Harbour Limits
Below are the proposed Argyll & Bute Council limits for Oban Harbour. The CMAL area around the
Railway pier has been left out of the chart but will of course be nested within the larger Municipal
area. The limits have been derived following consultation with NLB, CMAL & CFL as well as a
Navigational Risk Assessment (NRA) using Maritime & Coastguard Agency (MCA) approved
methodology, Hazard Identification (HazID) Workshop and formed part of a public consultation.
The area enclosed by the northern boundary includes the No 1 and No 3 anchorages which are
marked with the magenta anchor symbols.
The southern limit extends to beyond the CFL ferry service to Kerrera.
KEY FOR CHARTS
Mark Image Description
Purple lines Indicate the limits of
the proposed Harbour
limits
Star Points Indicate the points on
the boundaries which
define the limits
Appendix 3
Page 51

Page 52

Northern Boundary to Proposed Limits 
Southern Boundary to Proposed Limits   
Page 52