Appendix 1 Marine Asset Management Plan
Argyll and Bute Council · 12 September 2024
Back to Argyll and Bute Harbour Board — 12 September 2024 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
Classification: OFFICIAL# 1 Asset Location 2024/25 Items 2025/26 Items 2026/27 Items 2027/28 Items 2028/29 Items Bunessan £5,000 CAT 5 upgrade Campbeltown New Quay £100,000 HPU Control panel and cylinder O/H Campbeltown Old Quay £5,000,000 Construction wall A £1,000,000 Construction wall A Craignure Pier £1,000,000 Licencing. Finalise design and Tender documentation £2,000,000 Finalise design and Tender documentation £20,000,000 Construction of terminal £20,000,000 Construction of terminal £10,000,000 Complete construction of terminal Craignure PAS £1,000,000 Consultant supporting preparation on tender for new structure. Aiming to tender for new PAS in Q3 FY24/25. Result of this will inform on precise costs for a new PAS structure Cuan Ferry slips (Cuan & Luing) £2,000 Development of outline business case for future infrastructure £2,000,000 Future provision Easdale Piers £1,000 Development of outline business case for future infrastructure £2,400,000 Future provision Ellenabeich Pier £1,000 Development of outline business case for future infrastructure £5,000,000 Future provision Gigha Ferry slip £300,000 Consultancy for Design & EIA (inc Tayinloan) £300,000 Consultancy for Design & EIA (inc Tayinloan) £500,000 Start construction breakwater & aligning £10,000,000 Ongoing construction £1,000,000 Complete construction breakwater and aligning Fionnphort £500,000 New aligning structure: Construction £25,000,000 Ongoing construction Iona Ferry slip £10,000,000 Construction breakwater £5,000,000 Construction breakwater Dunoon Harbour £50,000 Scope of project greatly reduced. Budget to be reduced and minor works completed. Delay for Transport Scotland decision on vesel funding. £300,000 Upgrade works - to be determined Feolin Ferry slip TBC Installation of passenger access pontoon. Funding allocated from Crown Estates. Port Askaig £2,000,000 New Islay vessel enabling works Rothesay £3,500,000 Berthing face stab works £1,000,000 Round head capital works APPENDIX 1 - Marine Asset Management Plan £20,405,000Year Totals £23,450,000 £9,604,000 £45,500,000 £30,000,000