Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
13 March 2025 
NOTICE OF MEETING 
A meeting of the ARGYLL AND BUTE HARBOUR BOARD will be held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on
THURSDAY, 20 MARCH 2025 at 2:30 PM, or at the conclusion of the Environment, Development
and Infrastructure Committee at 11.00am, whichever is the later, which you are requested to
attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES (Pages 3 - 6)  
Minutes of the Argyll and Bute Harbour Board held on 12 September 2024 
4. PORT MARINE SAFETY CODE (Pages 7 - 130)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
5. MARINE ASSET MANAGEMENT PLAN - WORKS UPDATE (Pages 131 - 138)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
6. MARINE ASSET MANAGEMENT PLAN - CRAIGNURE FERRY TERMINAL (Pages
139 - 156)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
7. STATUTORY HARBOUR BOARD ACCOUNTS (Pages 157 - 164)  
Report by Executive Director with responsibility for Roads and Infrastructure Services
/ Section 95 Officer 
REPORT FOR NOTING 
8. ARGYLL AND BUTE HARBOUR BOARD WORKPLAN (Pages 165 - 166) 
Public Document Pack

Page 2

Argyll and Bute Harbour Board 
Councillor John Armour (Vice-Chair) Councillor Gordon Blair
Councillor Maurice Corry Councillor Andrew Kain
Councillor Liz McCabe Councillor Dougie McFadzean
Councillor Ross Moreland (Chair) Councillor Andrew Vennard 
Contact: Katie McKenzie, Committee Services Officer    Tel: 01546 604465

Page 3

MINUTES of MEETING of ARGYLL AND BUTE HARBOUR BOARD held in the ON A HYBRID
BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT
TEAMS 
on THURSDAY, 12 SEPTEMBER 2024 
Present: Councillor Ross Moreland (Chair) 
Also Present:
Councillor John Armour
Councillor Gordon Blair
Councillor Maurice Corry
Councillor Fiona Howard 
Councillor Amanda Hampsey
Councillor Julie McKenzie
Councillor Liz McCabe
Councillor Dougie McFadzean
Councillor Andrew Vennard 
Councillor Tommy Macpherson
Councillor Yvonne McNeilly 
Attending: Douglas Hendry, Executive Director 
Kirsty Flanagan, Executive Director
David Logan, Head of Legal and Regulatory Services
Jim Smith, Head of Roads and Infrastructure Services
Scott Reid, Marine Operations Manager
Stuart McLean, Committee Manager 
1. APOLOGIES FOR ABSENCE 
There were no apologies for absence. 
NOTICE OF MOTION UNDER STANDING ORDER 14
The Committee Manager advised that the following Notice of Motion Under Standing
Order 14 had been received as a matter of urgency. 
The Harbour Board resolves and agrees as follows: 
1. That an additional meeting of the Harbour Board is duly convened on Wednesday
25 September 2024 (which said additional meeting of the Harbour Board is
hereafter referred to as “the Meeting”);   
2. That the purpose of the Meeting shall be to receive, note, and consider the
Briefing Note circulated to Harbour Board Members on 11 September 2024. 
Moved by Councillor Andrew Vennard, seconded by Councillor Maurice Corry. 
The Chair ruled that he did not consider this item to be urgent and that it would be
included as an item of business for the next ordinary meeting, unless it is disposed of
in some other way before then. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest.
Page 3 Agenda Item 3

Page 4

3. MINUTES 
The Minutes of the meeting of the Argyll and Bute Harbour Board held on 21 March
2024 were approved as a correct record. 
4. PORT MARINE SAFETY CODE 
The Harbour Board gave consideration to a report providing an update on the status
of Argyll and Bute Council as Harbour Authority and it’s compliance with the Port
Marine Safety Code 
Decision 
The Argyll and Bute Harbour Board – 
1. noted the contents of the submitted report; 
2. approved the Harbour Consultation Policy for inclusion with the Marine Safety
Management System; 
3. approved the Harbours and Pier use Policy for inclusion with the Marine Safety
Management System; and 
4. approved the Collection of Fees Policy for inclusion with the Marine Safety
Management System. 
(Reference: Report by Executive Director with responsibility for Roads and
Infrastructure Services dated August 2024, submitted) 
* 5. MARINE ASSET MANAGEMENT PLAN 
The Harbour Board considered a report providing a review of the marine
infrastructure works Marine Asset Management Plan. It included an update on
significant and major programmes currently planned and underway within Argyll and
Bute Council’s Marine Asset Management Plan. 
Decision 
The Argyll and Bute Harbour Board – 
1. noted the update on the major programmes currently being addressed within
Argyll and Bute Council’s Marine Asset Management Plan; 
2. noted that £23.4 million worth of capital works were underway or about to
commence in the financial year 2024 / 2025; 
3. noted that there was a potential spend of c. £129 million over the next 5 years,
the majority of which would support the new CMAL & CFL / CalMac fleet renewal; 
4. noted the new Marine Asset Management Board structure for monitoring and
managing marine infrastructure projects; 
Page 4

Page 5

5. agreed to recommend to the Council, when setting the fees and charges for 2025
/ 2026 that it approves an increase to piers and harbours fees and charges of 8%
to generate sufficient income to develop the Council’s marine infrastructure. 
(Reference: Report by Executive Director with responsibility for Roads and
Infrastructure Services dated September 2024, submitted) 
6. ARGYLL AND BUTE HARBOUR BOARD WORKPLAN 
The Argyll and Bute Harbour Board workplan was before the Harbour Board for
noting. 
Decision 
The Argyll and Bute Harbour Board noted the content of the workplan. 
(Reference: Argyll and Bute Harbour Board Work Plan dated 12 September 2024,
submitted) 
7. NOTICE OF MOTION UNDER STANDING ORDER 13 
The following Notice of Motion Under Standing Order 13 was before the Harbour
Board for consideration: 
The Harbour Board resolves and agrees as follows: 
1. That Council Officers are instructed to prepare reports showing statements of
account of the annual income and expenditure for each of the 8 statutory harbour
authorities where the Council is the statutory harbour authority, for the noting by
the Harbour Board; declaring that the said reports shall be prepared on an annual
basis, commencing with the relevant statements of account for the 2024/2025
financial year, and provided for noting by the Harbour Board at duly Public
Document Pack convened ordinary meetings of the Harbour Board each calendar
year; 
2. That Council Officers are instructed to prepare a report on the options for the
future financial reporting regime of the portfolio of Piers, Harbours, and other
maritime facilities managed by the Council, for consideration by the Harbour
Board in due course, together with a report outlining the options for the non-
financial performance reporting of the portfolio of Piers, Harbours, and other
maritime facilities managed by the Council; declaring that the said reports shall be
prepared and provided for consideration by the Harbour Board no later than the
last ordinary meeting of the Harbour Board held during the 2025 calendar year. 
Moved by Councillor Andrew Vennard, seconded by Councillor Maurice Corry. 
Amendment 
In terms of the Council’s Constitution, the Authority’s Chief Financial Officer has
responsibility for the administration of the financial affairs of the Council, and is
requested by the Board to bring a report to a future meeting setting out the
arrangements for financial reporting in respect of all the Council’s Piers, Harbours
and Marine assets.
Page 5

Page 6

Moved by Councillor Ross Moreland, seconded by Councillor John Armour. 
As the meeting was being held on a hybrid basis, the vote required to be taken by
calling the Roll and Members voted as follows – 
Motion   Amendment 
Councillor Corry  Councillor Armour
Councillor Howard  Councillor Blair
Councillor McCabe  Councillor McFadzean
Councillor Vennard  Councillor Moreland 
Decision 
On there being an equality of votes with the Motion receiving 4 votes and the
Amendment receiving 4 votes, the Chair gave his casting vote to the Amendment
and the Harbour Board resolved accordingly.  
(Reference: Notice of Motion Under Standing Order 13 proposed by Councillor
Andrew Vennard, seconded by Councillor Maurice Corry, submitted and amended,
and Amendment by Councillor Ross Moreland, seconded by Councillor John
Armour, tabled)   
Page 6

Page 7

ARGYLL AND BUTE COUNCIL  ARGYLL & BUTE HARBOUR BOARD 
ROADS AND INFRASTRUCTURE SERVICES       20 MARCH 2025 
PORT MARINE SAFETY CODE 
1.0 INTRODUCTION 
1.1  This report provides Members with an update on the status of Argyll and Bute
Council as Harbour Authority and its compliance with the Port Marine Safety
Code (PMSC).
1.2 It also introduces the Designated Person annual report. 
2.0   RECOMMENDATIONS 
2.1  Members of the Harbour Board are asked to note and consider this report 
3.0 DETAIL 
3.1 Statutory Harbour Authority areas
3.1.1 Argyll and Bute Council is a Statutory Harbour Authority (SHA) at 8 locations and
marine asset owner at a further 28 facilities. The SHA locations are: 
1. Bruichladdich Pier, by virtue of the ‘Islay Piers Order, 1904’. 
2. Carradale Harbour, by virtue of the ‘Pier and Harbour Orders Confirmation (No
3) Act, 1901’. 
3. Campbeltown Harbour, by virtue of ‘Campbeltown Harbour Acts and Orders
1846 to 2011’. In addition, the Council is also the Competent Harbour Authority in
respect of Pilotage, under the requirements of the Pilotage Act 1987, at
Campbeltown Harbour. 
4. Craignure Harbour, by virtue of the ‘Argyll County Council (Arinagour and
Craignure Piers, etc) Order 1961’.
Page 7 Agenda Item 4

Page 8

5. Dunoon Harbour, by virtue of ‘The Pier and Harbour Orders Confirmation Acts
1895 to 1906’. 
6. Oban North & South Pier, by virtue of the ‘Oban Pier and Harbour Orders 1862
to 1988’. 
7. Port Askaig, by virtue of the ‘Port Askaig Acts and Order 1904 to 1975’. 
8. Rothesay Harbour, by virtue of the ‘Rothesay Harbour Acts and Orders 1831
to 1937’. 
3.2 Compliance with the PMSC
3.2.1 Argyll and Bute Council achieves compliance with the PMSC by implementing,
monitoring and reviewing the Marine Safety Management System (MSMS). The
MSMS includes the policies and procedures which seek to enhance the safety at
all our facilities and is externally audited by the Designated Person (DP).
3.2.2 The audits carried out at Campbeltown Harbour, Carradale Harbour, Tayinloan
pier, West Loch Tarbert and Arinagour Coll during 2024 identified through
evidence sampled during the audit and onsite observations, that the Council has
met the requirement of the Port Marine Safety Code.
3.2.3 Although the Council is in compliance with the PMSC (the Code) as it stands at
present, the Code itself is undergoing a review with a new publication due
imminently.
3.2.4 The Duty Holder is therefore required to submit a declaration of compliance to the
Maritime and Coastguard Agency (MCA) only after the new Code is available and
external Assurance Audit confirms compliance with the ‘new’ version’s provisions.
3.3 Audit results
3.3.1 As well as a Statutory Harbour Authority (SHA) Campbeltown is also a Competent
Harbour Authority (CHA) in that it provides compulsory pilotage to certain
qualifying vessels. That aspect was therefore also subject to audit.
3.3.2 The audit found that Campbeltown had the following best practice areas:
• Provision and maintenance of Aids to Navigation is recognised as an area
of best practice with a 100% availability for Category 3 and 99.76% for
Category 2 Aids. 
• Marine and operational risk assessments are conducted with the active
involvement of the Pier Operatives. Toolbox talks are held and recorded,
which is considered to be a best practice approach. 
• The Pilot boarding was undertaken in compliance with best practice. The
Master/Pilot Exchange (MPX) was accurately handled; during the pilotage
trip it was noted that information exchange continued. Delivery of Pilotage
Duty is considered to be an area of best practice.
Page 8

Page 9

3.3.3 The audit also identified 33 observations detailed in the report where improvement
opportunities exist. Some of these refer to Council wide administrative items such
as Harbour Board Members undertaking Duty Holder Training and some were
specific to the port.  In any case the conclusion is that although the Council
complies with the Code, there is still ongoing work and improvements to make.
3.3.4 The Coll and Kintyre audits found that provision and maintenance of Aids to
Navigation is recognised as an area of best practice with a 100% availability for
Category 3 and 99.76% for Category 2 Aids.
3.3.5 The audit also identified 19 observations detailed in the report where improvement
opportunities exist. Much of these were in the area of cleanliness and
housekeeping at the remote piers where Argyll and Bute Council have no staff
presence and is further justification for the installation of CCTV for enforcement
of our rules and policies.
3.4 Objectives
3.4.1 Marine Operations officials supported by the Duty Holder and the DP, are
committed to increasing best practice across the Argyll and Bute Council area
and in particular, the enforcement of our policies and rules and minimising future
observations for improvement.
3.4.2 The next set of audits will take place after the summer and will be subject to the
new PMSC. Work will continue to concentrate on ensuring continued compliance
and improvements.
3.4.3 The Council’s MSMS will be updated with any new items that are required for the
new PMSC as soon as it is published. There are also some routine updates
required, and these will be completed at the same time to be reviewed by the Duty
Holder.
3.4.4 The updated MSMS, Safety Plan and audit reports will be presented to the
September Harbour Board for noting and approval of Harbour Board Members. 
4.0 CONCLUSION 
4.1 This report provides Members with an update on the status of Argyll and Bute
Council as Harbour Authority and its compliance with the Port Marine Safety Code
(PMSC).  
5.0 IMPLICATIONS 
5.1 Policy - None directly arising from this report.
5.2 Financial - None arising from this report
Page 9

Page 10

5.3  Legal - Failure to comply with the PMSC could have legal consequences
following a marine incident.
5.4  HR – None.
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics - None arising from this report. 
5.5.2   Socio-economic Duty - None directly arising from this report. 
5.5.3  Islands - Compliance with the PMSC will help ensure safe and effective
port operations.
5.6 Climate Change - Due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise. 
5.7 Risk - Compliance with the PMSC will minimise the risk of port operations.
5.8  Customer Service - Compliance with the PMSC will assure customers and port
users; and assist council staff with safe operations.
5.9 The Rights of the Child (UNCRC) - None directly arising from this report. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure Services
Councillor John Armour, Policy Lead for Roads, Transport and Amenity 
FEBRUARY 2025                                                   
For further information contact:
Scott Reid, Marine Operations Manager Tel: 01546 604 696
Stephen Hall, Interim Head of Roads and Infrastructure Services Tel: 01546 604 324 
APPENDICES
Appendix 1 - DP Annual Report Feb 2025
Appendix 2 - PMSC Audit Campbeltown Oct24
Appendix 3 - PMSC Audit Coll Kintyre Oct 24 
Page 10

Page 11

Argyll and Bute Council
Designated Person (PMSC)
Annual Report 2025
February 2025
APPENDIX 1Page 11

Page 12

Designated Person (PMSC)
Annual Report 2025 
February 2025 
Page 12

Page 13

Designated Person (PMSC): Annual Report 2025  Argyll and Bute Council
ABPmer, February 2025, R.4783 | i
Document Information
Document History and Authorisation
Title Designated Person (PMSC)
Annual Report 2025
Commissioned by Argyll and Bute Council
Issue date February 2025
Document ref R.4783
Project no R/4952/01
Date Version Revision Details
03 February 2025 1 Issued for client review
25 February 2025 2 Issued for client use
Prepared
(Designated Person)
Approved
(Quality Manager)
Authorised
(Project Director)
Monty Smedley Trevor Auld Gordon Osborn
Suggested Citation
ABPmer, (2025).  Designated Person (PMSC), Annual Report 2025, ABPmer Report No. R.4783.
A report produced by ABPmer for Argyll and Bute Council, February 2025.
Notice
ABP Marine Environmental Research Ltd ("ABPmer") has prepared this document in accordance with the client’s instructions, for
the client’s sole purpose and use.  No third party may rely upon this document without the prior and express written agreement
of ABPmer.  ABPmer does not accept liability to any person other than the client.  If the client discloses this document to a third
party, it shall make them aware that ABPmer shall not be liable to them in relation to this document.  The client shall indemnify
ABPmer in the event that ABPmer suffers any loss or damage as a result of the client’s failure to comply with this requirement. 
Sections of this document may rely on information supplied by or drawn from third party sources.  Unless otherwise expressly
stated in this document, ABPmer has not independently checked or verified such information.  ABPmer does not accept liability
for any loss or damage suffered by any person, including the client, as a result of any error or inaccuracy in any third party
information or for any conclusions drawn by ABPmer which are based on such information. 
All content in this document should be considered provisional and should not be relied upon until a final version marked
‘issued for client use’ is issued. 
All images on front cover copyright ABPmer.
ABPmer
Quayside Suite, Medina Chambers, Town Quay, Southampton, Hampshire   SO14 2AQ
T:44 (0) 2380 711844   W: http://www.abpmer.co.uk/ 
Page 13

Page 14

Designated Person (PMSC): Annual Report 2025    Argyll and Bute Council
ABPmer, February 2025, R.4783  | ii
Contents
1 Introduction ................................................................................................................................... 1
2 Port Marine Safety Code ........................................................................................................... 1
2.1 Argyll and Bute Council and the Code ............................................................................................... 2
2.2 Assurance audits .......................................................................................................................................... 2
3 Audit Outcome ............................................................................................................................. 2
3.1 Assurance audit outcome ........................................................................................................................ 4
4 Delivery Plan and Activities ...................................................................................................... 5
5 Designated Person Summary ................................................................................................. 5
6 References ...................................................................................................................................... 5
7 Abbreviations / Acronyms ........................................................................................................ 6 
Tables
Table 1. Port Marine Safety Code Ten Key Measures .................................................................................... 1
Table 2. Campbeltown Harbour 2024 .................................................................................................................. 3
Table 3. Coll and Kintyre 2024 ................................................................................................................................ 4 
Page 14

Page 15

Designated Person (PMSC): Annual Report 2025    Argyll and Bute Council
ABPmer, February 2025, R.4783  | 1
1 Introduction
This report is provided by ABPmer to Argyll and Bute Council and is written to inform the Harbour Board
and Duty Holder of their current status in respect of compliance with the Port Marine Safety Code
(PMSC) published by the Department for Transports (DfT) and regulated through the Maritime and
Coastguard Agency (MCA).  The Port Marine Safety Code is referred to within this report as ‘the Code’
and the accompanying Guide to Good Practice is abbreviated to ‘the GtGP’ (DfT, 2018).  This report
summarises activities carried out by ABPmer as the supplier of Designated Person services between
01 January 2024 and 31 December 2024.  
2 Port Marine Safety Code
The Code sets out a national standard for every aspect of port marine safety (DfT, 2016).  The aim of the
Code is to enhance safety for everyone who uses or works in the UK port marine environment.  In order
to successfully implement the requirements of the Code, ten key measures are identified as relevant for
all Harbour Authorities to consider, as shown in Table 1.  These are summarised below: 
Table 1. Port Marine Safety Code Ten Key Measures
No Ten Key Measures Required for Successful Implementation of the Code 
1 Duty Holder Formally identify and designate the Duty Holder, whose members are
individually and collectively accountable for compliance with the Code
and their performance in ensuring safe marine operations in the
harbour and its approaches.
2 Designated
Person
A ‘Designated Person’ must be appointed to provide independent
assurance about the operation of the marine safety management
system. The Designated Person must have direct access to the Duty
Holder.
3 Legislation The Duty Holder must review, and be aware of, their existing powers
based on local and national legislation; seeking additional powers if
required, in order to promote safe navigation.
4 Duties and
Powers
Comply with the duties and powers under existing legislation, as
appropriate.
5 Marine Risk
Assessment
Ensure all marine risks are formally assessed and are eliminated, or as
low as reasonably practicable in accordance with good practice.
6 Marine Safety
Management
System 
Operate an effective marine safety management system (MSMS), which
has been developed after consultation, is based on formal risk
assessment, and has an appropriate approach to incident investigation.
7 Review and Audit Monitor, review and audit the risk assessment and marine safety
management system on a regular basis – the independent designated
person has a key role in providing assurance for the Duty Holder.
8 Competence Use competent people (i.e., trained, qualified and experienced) in
positions of responsibility for managing marine and navigation safety.
9 Plan Publish a safety plan, showing how the standard in the Code will be
met, and a report assessing the performance against the plan at least
every three-years.
10 Aids to
Navigation
Comply with directions from the General Lighthouse Authorities and
supply information and returns as required.
Page 15

Page 16

Designated Person (PMSC): Annual Report 2025    Argyll and Bute Council
ABPmer, February 2025, R.4783  | 2
2.1 Argyll and Bute Council and the Code
Argyll and Bute Council is a Statutory Harbour Authority at eight locations and a marine asset owner
at a further 28 marine facilities located throughout the Council area; in total that accounts for 36 ports,
harbours, piers and marine facilities.  The Council’s Statutory Harbour Authorities are namely: 
1. Bruichladdich Pier, by virtue of the ‘Islay Piers Order, 1904’.  
2. Campbeltown Harbour, by virtue of ‘Campbeltown Harbour Acts and Orders 1846 to 2011’.  
3. Carradale Harbour, by virtue of the ‘Pier and Harbour Orders Confirmation (No 3) Act, 1901’.  
4. Craignure Harbour, by virtue of the ‘Argyll County Council (Arinagour and Craignure Piers, etc)
Order 1961’. 
5. Dunoon Harbour, by virtue of ‘The Pier and Harbour Orders Confirmation Acts 1895 to 1906’. 
6. Oban North & South Pier, by virtue of the ‘Oban Pier and Harbour Orders 1862 to 1988’.  
7. Port Askaig, by virtue of the ‘Port Askaig Acts and Order 1904 to 1975’.  
8. Rothesay Harbour, by virtue of the ‘Rothesay Harbour Acts and Orders 1831 to 1937’. 
The Council is the marine asset owner and, in most cases, operator of 28 piers, wharves and slipways. 
Some of these marine assets are located within the jurisdiction of another Statutory Harbour Authority
(for example, Kilcreggan and Helensburgh Piers are located in Clydeport’s harbour).  Others are located
outside of Harbour Authority boundaries (for example, Iona and Fionnphort).  In all situations, the
Council is responsible for marine safety and must manage these facilities in compliance with the
requirements of the Code.  
2.2 Assurance audits
The primary role of the Designated Person is to provide independent assurance about the operation of
the marine safety management system.  This is achieved through assurance auditing at ports, harbour,
piers and other marine facilities.  The following audits were conducted during 2024: 
 21 July 2024 to observe an act of Pilotage at Campbeltown, with a second visit on 03 September
2024 to review harbour operations. 
 03 to 04 September 2024: Carradale Harbour, Tayinloan Pier and West Loch Tarbert.
 12 September 2024: middle Pier in Coll harbour, on the Isle of Coll.  
3 Audit Outcome
The following section provides the outcome of the audits as a comparison against the Code’s ten key
measures.  The following colour coding is used: 
A red identifies a non-compliance with the requirements of the Code or a breach of legal
obligations, which may also compromise marine safety, environmental safety or presents a
significant reputational risk. 
An amber is an Opportunity for Improvement, such as an update to information,
procedural change, or a non-conformity with local operating instructions; addressing these
items may improve the overall system standard. 
A green indicates an area of the Code which is delivered satisfactorily.   
Areas of best practice have also been identified as part of the audit’s outcome.  
Page 16

Page 17

Designated Person (PMSC): Annual Report 2025    Argyll and Bute Council
ABPmer, February 2025, R.4783  | 3
Table 2. Campbeltown Harbour 2024
No Ten Key Measures Required for Successful Implementation of the Code  RAG
1 Duty Holder The Council has a Duty Holder and a Harbour Board.
Amber: Not all members of the Harbour Board have attended
Duty Holder Training, an awareness visit would be advantageous. 
2 Designated
Person
Argyll and Bute Council has an appointed Designated Person.  The
Designated Person provides an annual briefing to the Duty Holder
and Board.   
3 Legislation The MSMS lists local Acts and Orders.  
Amber: Campbeltown Harbour limits on the chart do not match
the Marine Directorate data layers. 
4 Duties and
Powers
Use of Powers of Direction and CHA duty was checked.  
Amber: The Council does not have a process for checking
commercially operated Coded vessels in its ports and harbours.   
5 Marine Risk
Assessment
Marine Risk Assessment are in place and fully reviewed.  
Amber: Whilst Council staff are engaged in risk assessment
reviews, there is limited evidence of wider stakeholder input.   
6 Marine Safety
Management
System 
The Council issues an MSMS covering all ports, harbours and piers 
Amber: There is no Standard Operating Procedure (SOP) on how
Special Directions are given or recorded by the Harbour Master Team. 
7 Review and
Audit
The Council has an external audit structure in place.  
Amber: There was no evidence that Pilotage had been reviewed
when the new Pilot Manual and Directions were issued in 2021.     
8 Competence Training records are held centrally in MHR iTrent.  A&BC uses a
dedicated harbour training matrix which identifies the skill set
needed by Marine Staff at each location.   
9 Plan The ‘Marine Safety Plan’ was approved for issue by the Harbour
Board on 21 March 2024, and is included as a Board Meeting
annex.  The Marine Safety Plan is hosted on the A&BC’s website.   
10 Aids to
Navigation
As the Local Lighthouse Authority, the Council meets and exceeds
the availability criteria: Category 2 = 99.76% (target is 99.0%),
Category 3 = 100% (target is 97.0%).   
Items of best practice noted during the Campbeltown audit include the following topics:   
 Provision and maintenance of Aids to Navigation is recognised as an area of best practice with a
100% availability for Category 3 and 99.76% for Category 2 Aids.  
 Marine and operational risk assessments are conducted with the active involvement of the Pier
Operatives.  Toolbox talks are held and recorded, which is considered to be a best practice approach.  
 The Pilot boarding was undertaken in compliance with best practice.  The Master/Pilot Exchange
(MPX) was accurately handled; during the pilotage trip it was noted that information exchange
continued.  Delivery of Pilotage Duty is considered to be an area of best practice.   
Page 17

Page 18

Designated Person (PMSC): Annual Report 2025    Argyll and Bute Council
ABPmer, February 2025, R.4783  | 4
Table 3. Coll and Kintyre 2024
No Ten Key Measures Required for Successful Implementation of the Code  RAG
1 Duty Holder The Council has a Duty Holder and a Harbour Board.
Amber: Not all members of the Harbour Board have attended
Duty Holder Training, an awareness visit would be advantageous. 
2 Designated
Person
Argyll and Bute Council has an appointed Designated Person.  The
Designated Person provides an annual briefing to the Duty Holder
and Board.   
3 Legislation The MSMS lists local Acts and Orders.  
Amber: Only part of the ‘Carradale Pier’ Act is held by the Council,
the whole act should be obtained from Parliamentary archives.     
4 Duties and
Powers
Use of Powers of Direction and enforcement was checked.  
Amber: There is no towage guidance issued for Carradale
Harbour.   
5 Marine Risk
Assessment
Marine Risk Assessment are in place and fully reviewed.  
Amber: Whilst Council staff are engaged in risk assessment
reviews, there is limited evidence of wider stakeholder input.   
6 Marine Safety
Management
System 
The Council issues an MSMS covering all ports, harbours and piers 
Amber: Further development of specific SOPs for Carradale,
Tayinloan, West Loch Tarbert and Coll would be desirable.   
7 Review and
Audit
The Council has an external audit structure in place.  
Amber: There is no internal audit schedule, audits are arranged to
meet specific requirements.   
8 Competence Training records are held centrally in MHR iTrent.  A&BC uses a
dedicated harbour training matrix which identifies the skill set
needed by Marine Staff at each location.   
9 Plan The ‘Marine Safety Plan’ was approved for issue by the Harbour
Board on 21 March 2024, and is included as a Board Meeting
annex.  The Marine Safety Plan is hosted on the A&BC’s website.   
10 Aids to
Navigation
As the Local Lighthouse Authority, the Council meets and exceeds
the availability criteria: Category 2 = 99.76% (target is 99.0%),
Category 3 = 100% (target is 97.0%).   
One item of best practice was noted: 
 Provision and maintenance of Aids to Navigation is recognised as an area of best practice with a
100% availability for Category 3 and 99.76% for Category 2 Aids.  
3.1 Assurance audit outcome
The Campbeltown Audit summarised in Table 2, demonstrates that the standard of the Code was met. 
Additionally, the Coll and Kintyre Harbours and Piers audit also met the expectation of the Code; noting
that Carradale is a Statutory Harbour Authority and middle Pier on Coll, Tayinloan and West Loch Tarbert
are marine facilities.   
It should be noted that several observations were made at West Loch Tarbert.   
The lack of direct oversight of this location has led to marine users discarding unwanted nets, engine
oil, debris and for general fly-tipping.  Monitoring is conducted remotely and remains a cause for
concern from a marine safety and risk to marine pollution perspective.   
Page 18

Page 19

Designated Person (PMSC): Annual Report 2025    Argyll and Bute Council
ABPmer, February 2025, R.4783  | 5
4 Delivery Plan and Activities
During 2024, the Designated Person has attended the following: 
 Meetings:
o 21 March 2024: Designated Person presentation to the Harbour Board via MS Teams.  
o 25 October 2024: Duty Holder Training, attended via MS Teams.   
The generalised plan for the Designated Person in 2025 includes an annual meeting with the Duty
Holder and attendance at Harbour Master meetings.  The audit delivery dates are shown below: 
 August/September 2025: Ellenabeich Pier, Easdale Slips, Cuan Ferry Slip.
 August/September 2025: Dunoon.  
5 Designated Person Summary
The Council is responsible for eight Statutory Harbour Authorities and 28 marine facilities; all of which
are required to operate to the standard of the Port Marine Safety Code.   
The audits carried out at Campbeltown Harbour, Carradale Harbour, Tayinloan Pier, West Loch Tarbert
and middle pier (Coll) during 2024 have identified through evidence sampled during the audit and
onsite observations, that the Council has met the minimum requirement of the Port Marine Safety Code.   
The Duty Holder is advised to confirm its compliance with the Code to the Maritime and Coastguard
Agency at the next reporting opportunity.  It should be noted that the Port Marine Safety Code has
been updated and is expected to be reissued by Government in March or April of 2025.  It is possible
that the 2025 Code will introduce new or amended requirements and will therefore require a
comparison with existing provisions before concluding the Council’s compliance status.  Following the
2025 Code’s publication, the Council will have between 6-12 months to make its self-declaration as part
of the national Compliance Exercise.  Given the anticipated timescales, the Compliance Exercise is
expected to take place circa October 2025 to April 2026; this timescale will be confirmed by the MCA in
due course.  
6 References
Department for Transport, 2016.  Port Marine Safety Code.  Department for Transport (DfT),
November 2016. 
Department for Transport, 2018.  A Guide to Good Practice on Port Marine Operations Prepared in
conjunction with the Port Marine Safety Code 2016.  Department for Transport (DfT), February 2018. 
Page 19

Page 20

Designated Person (PMSC): Annual Report 2025    Argyll and Bute Council
ABPmer, February 2025, R.4783  | 6
7 Abbreviations / Acronyms
A&BC Argyll & Bute Council
CHA Competent Harbour Authority
DfT Department for Transport
DP Designated Person
GtGP Guide to Good Practice
MCA Maritime and Coastguard Agency
MS Microsoft
MSMS Marine Safety Management System
PMSC Port Marine Safety Code
RAG Red/Amber/Green
UK United Kingdom 
Cardinal points/directions are used unless otherwise stated. 
SI units are used unless otherwise stated. 
Page 20

Page 21

Page 21

Page 22

This page is intentionally left blank

Page 23

Argyll and Bute Council
Port Marine Safety Code
Audit: Campbeltown 2024
October 2024
APPENDIX 2Page 23

Page 24

Page intentionally left blank 
Page 24

Page 25

Port Marine Safety Code
Audit: Campbeltown 2024 
October 2024 
Source: https://www.argyll-bute.gov.uk/sites/default/files/migrated_files/marina-8.jpg 
Page 25

Page 26

Port Marine Safety Code - Audit: Campbeltown 2024  Argyll and Bute Council
ABPmer, October 2024, R.4589 | i
Document Information
Document History and Authorisation
Title Port Marine Safety Code
Audit: Campbeltown 2024
Commissioned by Argyll and Bute Council
Issue date October 2024
Document ref R.4589
Project no R/4952/01
Date Version Revision Details
16 October 2024 1 Issued for client review
Authorised 
(Designated Person)
Approved 
(Quality Manager)
Authorised 
(Project Director)
Monty Smedley Capt. Rod Lewis Gordon Osborn
Suggested Citation
ABPmer, (2024).  Port Marine Safety Code, Audit: Campbeltown 2024, ABPmer Report No. R.4589.  A report produced by ABPmer
for Argyll and Bute Council, October 2024.
Author
M.J. Smedley
Notice
ABP Marine Environmental Research Ltd ("ABPmer") has prepared this document in accordance with the client’s instructions, for
the client’s sole purpose and use.  No third party may rely upon this document without the prior and express written agreement
of ABPmer.  ABPmer does not accept liability to any person other than the client.  If the client discloses this document to a third
party, it shall make them aware that ABPmer shall not be liable to them in relation to this document.  The client shall indemnify
ABPmer in the event that ABPmer suffers any loss or damage as a result of the client’s failure to comply with this requirement. 
Sections of this document may rely on information supplied by or drawn from third party sources.  Unless otherwise expressly
stated in this document, ABPmer has not independently checked or verified such information.  ABPmer does not accept liability
for any loss or damage suffered by any person, including the client, as a result of any error or inaccuracy in any third party
information or for any conclusions drawn by ABPmer which are based on such information. 
All content in this document should be considered provisional and should not be relied upon until a final version marked
‘issued for client use’ is issued. 
All images on front cover copyright ABPmer.
ABPmer
Quayside Suite, Medina Chambers, Town Quay, Southampton, Hampshire   SO14 2AQ
T: +44 (0) 2380 711844   W: http://www.abpmer.co.uk/ 
Accepted as Issued for client use
Page 26

Page 27

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | ii
Contents
1 The Port Marine Safety Code ................................................................................................ 1
1.1 About the Harbour Authority ................................................................................................................. 2
2 Purpose and Method ............................................................................................................... 3
2.1 Audit scope .................................................................................................................................................... 3
2.2 Audit definitions and outcomes ............................................................................................................ 3
2.3 Audit date and criteria .............................................................................................................................. 4
2.4 Auditor............................................................................................................................................................. 4
2.5 Auditees .......................................................................................................................................................... 4
3 Audit Summary ........................................................................................................................... 5
4 References .................................................................................................................................... 7
4.1 Websites ......................................................................................................................................................... 7
5 Abbreviations/Acronyms ........................................................................................................ 8 
Appendices
A Detailed Audit Findings ........................................................................................................ 11
A.1 PMSC Section 1 – Accountability for Marine Safety .................................................................. 11
A.2 PMSC Section 2 – Key Measures Needed to Secure Marine Safety .................................... 15
A.3 PMSC Section 3 – General Duties and Powers ............................................................................. 22
A.4 PMSC Section 4 – Specific Duties and Powers ............................................................................. 25
B Quayside Check ....................................................................................................................... 36
B.1 Quayside Check ........................................................................................................................................ 36 
Figure
Figure 1. Campbeltown Harbour Limits ................................................................................................................ 2 
Images  
Image B1. Campbeltown, missing water egress ladder hand-grip ............................................................ 38
Image B2. Campbeltown, Old Quay bollard ....................................................................................................... 38
Image B3. Campbeltown, New Quay wooden edge beams ......................................................................... 39
Image B4. Campbeltown, Old Quay wooden edge beams ........................................................................... 39 
Page 27

Page 28

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 1
1 The Port Marine Safety Code
The Port Marine Safety Code (‘the Code’) sets out a national standard for every aspect of port marine
safety.  Its aim is to enhance safety for everyone who uses, or works in, the UK port marine environment. 
It is authored by the UK Government, supported by the devolved administrations and representatives
from across the maritime sector and, whilst the Code is not mandatory, these bodies have a strong
expectation that all harbour authorities will comply.  The Code is applicable both to Statutory Harbour
Authorities and to other marine facilities, which may not have statutory powers; these are collectively
referred to throughout the Code as ‘organisations’ (DfT, 2016). 
In reading this audit report, the Council and Duty Holder should note the following extract from the
Code: 
“The Code does not contain any new legal obligations but includes (amongst other things) references
to the main legal duties which already exist.  Failure to comply is not an offence in itself.  However,
the Code represents good practice as recognised by a wide range of industry stakeholders and a failure
to adhere to good practice may be indicative of a harbour authority being in breach of certain legal
duties.  Moreover, the organisation may suffer reputational damage if it has publicly committed to
the Code’s standards and then fails to meet them.” 
(DfT, 2016) 
In order to measure compliance with the Code, the table below sets out the 10 Duty Holder
responsibilities, and corresponding cross-references with sections of the Code, which this audit has
considered.   
No PMSC Duty Holder Responsibilities  PMSC Section 
Reference
1 Duty Holder Formally identify and designate the Duty Holder, whose members are
individually and collectively accountable for compliance with the Code
and their performance in ensuring safe marine operations in the harbour
and its approaches.
1.6-1.8, 1.10, 1.16-1.17
2 Designated
Person
A ‘Designated Person’ must be appointed to provide independent
assurance about the operation of the marine safety management system.
The designated person must have direct access to the Duty Holder.
1.11-1.12
3 Legislation The Duty Holder must review and be aware of their existing powers
based on local and national legislation; seeking additional powers if
required in order to promote safe navigation.
2.3-2.6, 
4.3-4.5
4 Duties and
Powers
Comply with the duties and powers under existing legislation as
appropriate.
1.3-1.5, 1.9, 1.13-1.15, 
3.1-3.14, 
4.2, 4.6-4.20, 4.25-4.32
5 Risk
Assessment
Ensure all marine risks are formally assessed and are eliminated or as low
as reasonably practicable in accordance with good practice.
2.7-2.11
6 Marine Safety
Management
System 
Operate an effective marine safety management system which has been
developed after consultation, is based on formal risk assessment, and
refers to an appropriate approach to incident investigation.
2.12-2.17, 2.19-2.23,
2.25, 2.29
7 Review and
Audit
Monitor, review and audit the risk assessment and marine safety
management system on a regular basis – the independent designated
person has a key role in providing assurance for the Duty Holder.
2.2, 2.24, 2.30-2.32
8 Competence Use competent people (i.e. trained, qualified and experienced) in
positions of responsibility for managing marine and navigation safety.
2.18
9 Plan Publish a safety plan showing how the standard in the Code will be met
and a report assessing the performance against the plan at least every 3
years.
2.26-2.28
10 Aids to
Navigation
Comply with directions from the General Lighthouse Authorities and
supply information and returns as required.
4.21-4.24
Page 28

Page 29

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 2
1.1 About the Harbour Authority
Campbeltown Harbour is at the south end of the Kintyre Peninsula, facing eastwards to the First of
Clyde.  Argyll and Bute Council (A&BC) is the Statutory Harbour Authority (SHA) for Campbeltown
Harbour with an area defined in the Campbeltown Harbour Acts and Orders 1846 to 2011.  The harbour
limits as recorded by Marine Scotland’s database are shown in Figure 1.  A&BC is also the Local
Lighthouse Authority (LLA) with respect to aids to navigation through Section 193 of the Merchant
Shipping Act 1995.  A&BC is also the Competent Harbour Authority in accordance with ‘The Argyll and
Bute Council (Pilotage Powers Order) 2007’. This provides A&BC with a duty to provide pilotage for
Campbeltown Harbour as required in the Pilotage Act 1987.   
Campbeltown Harbour has a number of marine facilities, including the North Atlantic Treaty
Organization (NATO) refuelling jetty on the south shore of the harbour.  This facility provides refuelling
to Government and visiting military vessels, with the infrastructure owned by the Ministry of Defence
(MOD) and operated by the Oils and Pipeline Agency (OPA).  At the western end of the harbour, the
town of Campbeltown has two quays; these are termed the ‘New Quay’ and the ‘Old Quay’.  The New
Quay is a general cargo berth of 120 m in length, with a dedicated Roll-on, Roll-off (RoRo) terminal and
linkspan on its eastern side.  The cargo berth is routinely used for cut timber, but can take a range of
cargo types.  The ‘Old Quay’ is an ‘L’ shape with two 60 m sides and a 90 m quay return.  The quay is
predominantly used by fish vessels including resident vessels and visiting fishing vessels.  The ‘Old Quay’
also has the Royal National Lifeboat Institute (RNLI) berth and access to the adjacent Campbeltown
Marina.  The marina is owned by A&BC and operated by a contracted third party.   
Other facilities in the harbour include a discussed fishing pier, a non-operational shipyard (privately
owned) and a sailing club operating from a slipway on the north shore of the harbour.   
Figure 1. Campbeltown Harbour Limits 
Page 29

Page 30

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 3
2 Purpose and Method
2.1 Audit scope
A&BC has contracted ABPmer to provide Designated Person services for its ports, harbours and piers. 
Part of this service includes the provision of annual auditing to establish if the Harbour Authority is
compliant with the requirements of the Port Marine Safety Code (PMSC).  The scope of the audit includes
a review of Harbour Authority performance against the standard laid out within the latest edition of the
Code.  Any aspects that do not comply with, or fully address, the requirements of the Code will be
identified, and recommendations for improvement will be made.  
2.2 Audit definitions and outcomes
2.2.1 Definitions
The following definitions are used in the audit report: 
Non-compliance: is a failure to adhere to a legal requirement such as an Act, Order or its Regulations. 
The Port Marine Safety Code requires organisations to confirm compliance with the requirements of the
Code.  Therefore, Port Marine Safety Code audits are designed to test the requirements of the Code
with any failure to comply identified as a ‘non-compliance’.   
Non-conformity: is an opportunity for the management system to improve through the identification
of a requirement that is not met.  Non-conformities are not regulatory but relate to the port or harbour’s
own operational instructions which are not met or fully met.  Any non-conformities identified through
the audit process are identified in bold text in the report.   
Evidence: Non-compliances and Non-conformities are identified through factual evidence sampled
during the audit.   
2.2.2 Outcomes
The audit report uses the following outcomes: 
Non-Compliance: a non-compliance with the requirements of the Code which are a
breach of legal obligations or may compromise marine safety, environmental safety or
present a significant reputational risk. Recommendations for addressing non-
compliances are identified in red. 
Observation: refers to an improvement opportunity such as an update to information,
procedural change, or a non-conformity with local operating instructions.  Whilst
observations are defined as improvement opportunities, addressing them may improve
the overall system standard. Recommendations for addressing observations are
identified in yellow.   
Satisfactory: a system component that meets or exceeds the requirements of the Code. 
Items of best practice are identified in bold.   
Not applicable: part of the Code that is not relevant to the Organisation being audited.   
Page 30

Page 31

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 4
2.3 Audit date and criteria
The audit was carried out onsite at Campbeltown Harbour as two visits.  The first visit was conducted
on 21 July 2024 to observe an act of Pilotage on the vessel MV Runner.  The second visit was conducted
on the 03 September 2024 to review harbour operations.   
The latest version of the PMSC, and the accompanying Guide to Good Practice (GtGP), has been used
as the benchmarking standard within Appendix A.  The audit tables also identify the paragraph numbers
from the Code (DfT, 2016) and relevant sections of the Guide to Good Practice (DfT, 2018), for cross
reference purposes.   
In addition, within Appendix B the Health and Safety Executive (HSE) publication L148 ‘Safety in Docks:
Approved Code of Practice and Guidance’ (ACOP) (HSE, 2014) and the Port Skills and Safety (PSS)
publications SIP 005 ‘Guidance on Mooring’ (PSS, 2019a) and SIP 014 ‘Guidance on Safe Access and
Egress’ (PSS, 2019b) have been used.  The Appendix tables to this report contain the test questions and
evidence, noting down compliance, non-compliance and observational remarks.  
2.4 Auditor
The following auditor conducted this audit.   
Team Member Initials Company, Designation
Monty Smedley MJS
ABPmer, Associate Maritime Consultant
Lead Auditor for Quality Management Systems (QMS ISO 9001)
Designed Person (PMSC) Argyll and Bute Council
Capt. Rod Lewis RAL ABPmer Associate Maritime Consultant
Auditor for Quality Management Systems (QMS ISO 9001)
2.5 Auditees
The following individuals participated in the audit.   
Team Member Initials Role/Designation
Allan Finlay AF Piers and Harbours – Technical Officer
John Willis JW Campbeltown – Assistant Harbour Master
Julie Hendry JH Marine Operations – Admin Officer
Capt. Jonathon Hague Capt. JH Campbeltown Authorised Pilot – Association of Forth Pilots 
Scott Reid SR Marine Operations Manager
Stephen Scally SS Campbeltown – Harbour Master 
Page 31

Page 32

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 5
3 Audit Summary
Number Key Measures
Ten-Point ‘Health Check’   
1 Duty Holder 0 2 4
2 Designated Person 0 0 2
3 Legislation 0 2 5
4 Duties and Powers 0 19 48
5 Risk Assessment 0 4 5
6 MSMS 0 4 10
7 Review and Audit 0 2 4
8 Competence 0 0 2
9 Plan 0 0 3
10 Aids to Navigation 0 0 2
Total 0 33 85 
The summary presented in the above table identifies that, for the ten-point health-check, Argyll and
Bute Council as the Statutory Harbour Authority for Campbeltown Harbour is found to be fully
compliant with the requirements of the Port Marine Safety Code.   
The following two areas of best practice were found during the audit: 
 Provision and maintenance of Aids to Navigation is recognised as an area of best practice with a
100% availability for Category 3 and 99.76% for Category 2 Aids.  
 Marine and operational risk assessments are conducted with the active involvement of the Pier
Operatives.  Toolbox talks are held and recorded, which is considered to be a best practice approach.  
 The Pilot boarding was undertaken in compliance with best practice.  The Master/Pilot Exchange
(MPX) was accurately handled; during the pilotage trip it was noted that information exchange
continued.  Delivery of Pilotage Duty is considered to be an area of best practice.   
The PMSC audit identified 33 observations relating to improvement opportunities for management
consideration, the detailed findings being presented in Appendix A.  The following points identify the
more significant items: 
 At the time of audit, not all Councillors on the Harbour Board have attended Duty Holder training,
the Marine Safety Plan has an objective of 100% attendance.  It is recommended that members of
the Harbour Board who have not attend Duty Holder training, complete this training as soon as
practical.
 Whilst Council staff are actively engaged in risk assessment reviews, there is limited evidence of
wider stakeholder consultation and engagement in marine risk assessments.  The experience and
knowledge of harbour users should be sought, and their engagement documented in the process.   
 There is no Standard Operating Procedures (SOP) detailing how Special Directions are given or
recorded by the Harbour Master team.  
 The Marine Safety Management System (MSMS) does not provide information on the port and
harbour stakeholder engagement process.
Page 32

Page 33

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 6
 A&BC does not have a formalised process for checking commercially operated Coded vessels at its
ports, harbours or piers.  It is recommended that the Council considers the requirements of the
GtGP (Section 11.3, 11.4) with respect to regulating third party commercial workboats and launches
within its area of jurisdiction and creates a registration scheme for workboats operating within the
Authority’s area.
 There is evidence that Pilotage has been reviewed in 2021 when the Pilotage Manual (including
Pilotage Directions) was updated.  It is recommended that A&BC, as the CHA, formally review the
need for Pilotage.  This is an expectation of both the Pilotage Act 1987 and the Code.  
 At the time of audit, the Pilotage Directions were not published (for example, available on the
Council’s website).  The Council, as CHA must publish a controlled copy of the Pilotage Directions
for Campbeltown on its website.  The directions should only be published once they have been
consulted upon by users of the harbour.  
 There is no evidence of a published passage plan, or detailed passage planning information
available to mariners accessing the harbour.  A&BC does have information for Campbeltown
Harbour on its website, but this is not considered detailed enough to allow effective passage
planning by visiting vessels.  Any vessels using a Campbeltown Pilot will have the passage plan
provided to them as part of the Pilotage service.  A&BC, as CHA, should publish a passage plan or
passage plan guidance on their website.   
Marine operations and quayside checks were also carried out, three observations were identified, the
detailed findings being presented in Appendix B.   
 The wooden edge protection beams at the RoRo berth and the Old Quay have deteriorated.  
 The Old Quay bollards were not painted, were not numbered, or Safe Working Loads (SWL)
identified.  
 At the RoRo ferry terminal, one egress ladder was missing the cope level hand-grab bar; this should
be repaired.    
Page 33

Page 34

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 7
4 References
DfT, 2016.  Port Marine Safety Code, Department for Transport (DfT) a, November 2016. 
DfT, 2018.  A Guide to Good Practice on Port Marine Operations Prepared in conjunction with the Port
Marine Safety Code 2016, Department for Transport (DfT), February 2018. 
Health and Safety Executive (HSE), 2014.  ‘Safety in Docks: Approved Code of Practice and Guidance’
(ACOP)’, Publication L148. 
ISO 9001: Quality Management Systems.  International Organization for Standardization. 
Port Skills and Safety (PSS), 2019.  Guidance on Mooring, SIP 005.  March 2019. 
Port Skills and Safety (PSS), 2019b.  Guidance on Safe Access and Egress, SIP 014.  September 2019.
4.1 Websites
https://forthpilots.com/forth-pilots-mission-statement 
https://www.argyll-bute.gov.uk/fees/24-25/marine 
https://www.argyll-bute.gov.uk/moderngov/ieListDocuments.aspx?CId=567&MId=15635&Ver=4 
https://www.argyll-bute.gov.uk/moderngov/ieListMeetings.aspx?CommitteeId=567 
https://www.argyll-bute.gov.uk/moderngov/mgCommitteeDetails.aspx?ID=567 
https://www.argyll-bute.gov.uk/my-council/leon-e-learning 
https://www.argyll-bute.gov.uk/roads-and-travel/marine-services/campbeltown-harbour 
https://www.argyll-bute.gov.uk/sites/default/files/2023-05/dp_contact_information3_abc.pdf 
https://www.argyll-bute.gov.uk/sites/default/files/migrated_files/dangerous_goods_notification_
procedures_may_2020.pdf 
https://www.gov.uk/government/publications/port-marine-safety-code-compliant-ports/port-marine-
safety-code-compliant-ports-list 
Page 34

Page 35

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 8
5 Abbreviations/Acronyms
A&BC Argyll and Bute Council 
ACOP Approved Code of Practice and Guidance
AtoN Aid(s) to Navigation
BPA British Ports Association
CARP Critical Activity Recover Plan
Cat Category
CERS Consolidated European Reporting System
CFL CalMac Ferries Limited
CHA Competent Harbour Authority
DfT Department for Transport
DGHAR Dangerous Goods in Harbour Areas Regulations
DRA Dynamic Risk Assessment
FRA Formal Risk Assessment 
GLA General Lighthouse Authority
GtGP Guide to Good Practice on Port Marine Operations
HDPCA Harbour, Docks and Piers Clauses Act 1847
HRO Harbour Revision Order
HSE Health and Safety Executive
IMO International Maritime Organization
ISO International Organization for Standardization
ISPO International Standard for Marine Pilotage
ISPS International Ship and Port Facility
KHM King’s Harbour Master
KPI Key Performance Indicator
LATON Local Aids to Navigation
LEON Council online e-learning platform
LLA Local Lighthouse Authority
LOA Length Overall
LPS Local Port Service
LSE Lifesaving Equipment
MAIB Marine Accident Investigation Branch
MARNIS Marine Risk Software Produced by ABPmer
MCA Maritime and Coastguard Agency
MGN Marine Guidance Notes
MHR iTrent Product name for the human resource and payroll software system
MOD Ministry of Defence
MPX Master/Pilot Exchange
MS Microsoft
MSMS Marine Safety Management System
MV Motor Vessel / Merchant Vessel
n/a Not Applicable
NATO North Atlantic Treaty Organization
OPA Oils and Pipeline Agency
OPRC International Convention on Oil Pollution Preparedness, Response and Co-operation
PEC Pilotage Exemption Certificates
PFSP Port Facility Security Plan
PMSC Port Marine Safety Code
PPU Portable Pilot Unit
Page 35

Page 36

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 9
PSS Port Skills and Safety
QMS Quality Management System
RATSA Railways and Transportation Safety Act
RNLI Royal National Lifeboat Institute
RoRo Roll-on, Roll-off
SAC Special Areas of Conservation
SEPA Scottish Environment Protection Agency 
SHA Statutory Harbour Authority
SIP Safety in Port
SOPs Standard Operating Procedures
SOSREP Secretary of State's Representative
SPA Special Protection Areas
SWL Safe Working Load
UK United Kingdom
UKHO United Kingdom Hydrographic Office
VHF Very High Frequency
VTS Vessel Traffic Service 
Cardinal points/directions are used unless otherwise stated. 
SI units are used unless otherwise stated.  
Page 36

Page 37

Appendices
Page 37

Page 38

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 11
A Detailed Audit Findings
A.1 PMSC Section 1 – Accountability for Marine Safety
PMSC / GtGP
Reference Subject Evidence Required
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
1.3-1.5 Duties and
Powers
Is the Organisation’s Duty
of Care for users of the
harbour, port of facility
stated?
Satisfactory – A&BC’s Marine Safety
Management System (MSMS), ‘Policies and
Statements’, Volume 1, revision 02, issued
21 March 2024.  The MSMS, Section 3.1
states: “Harbour Authorities have a range of
statutory and non-statutory duties and powers
relating to marine operations. The Council has
a Duty of reasonable Care to its harbour users
and will ensure the safety at work of
employees and other persons who may be
affected by the Authority's activities as far as is
reasonably practicable to do so”.  Additionally,
Section 10 ‘Conservancy’ also states that:
“There is a duty to conserve a harbour so that
it is reasonably fit for use as a port, and a duty
of reasonable care to see that the harbour is in
a fit condition for vessels to use.” 
MJS_001 MJS  
Are local Acts and Orders
identified?
Satisfactory – the harbour authority has a
copy of its local legislation.  Local Acts and
Orders 1846 to 2011 include:   
 The Campbeltown Harbour and Burgh Act’,
1846.  
 The Campbeltown Burgh and Harbour Act’,
1876.  
 Campbeltown Harbour and Gas Order 1925. 
 Campbeltown Harbour Water and Gas
Order Confirmation, 1935.
 Campbeltown Water Order Confirmation
1946.
 The Campbeltown (Ferry Terminal) Harbour
Revision Order 1996.
 The Argyll and Bute Council (Pilotage
Powers) 2007.
 The Campbeltown Harbour Revision Order
2011.   
MJS_010 MJS
Page 38

Page 39

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 12
PMSC / GtGP
Reference Subject Evidence Required
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
Cont.   
1.3-1.5
Cont.   
Duties and
Powers
Is the Harbour, Docks and
Piers Clauses Act (HDPCA)
1847 incorporated into local
Acts and Orders?  
Satisfactory – the HDPCA has been
incorporated into the Campbeltown Burgh
and Harbour Act’, 1876, Section 5.   
Observation – as only part of the 1876 Act is
available, it cannot be fully ascertained which
sections of the 1847 HDPCA have been
incorporated (or not).   
Recommend – the full 1876 Act is obtained
from Parliamentary Archives Section 5 is
reviewed to understand which parts of the
1847 Act have been incorporated.  
MJS_010 MJS
1.6 – 1.7 The Duty Holder Has the organisation
appointed and confirmed
who the Duty Holder is?  
Satisfactory – A&BC has assigned the post
and accountability of the Duty Holder to the
Council’s Executive Director of Development
and Infrastructure Services.  The Harbour
Board retains responsibility for providing
policy direction to the officers of the
Authority.  An organisational structure is
provided the MSMS, Section 1.6.   
MJS_001 MJS
1.8 The Duty Holder Are the Duty Holder’s
responsibilities for
compliance with Code
defined?  
Satisfactory – the MSMS, Section 1.4 lists the
principal requirements of the Duty Holder.   
MJS_001 MJS
1.10 The Duty Holder Does the Duty Holder (and
Harbour Board members)
have a clear understanding
of the port’s marine
activities and MSMS?
Satisfactory – the Harbour Board and Duty
Holder receive information from officers of
the Authority, presented as technical reports
to Board Meetings.  Periodically the Harbour
Board and Duty Holder visit one of the
Councils ports, harbours or piers.  The
Harbour Board were invited to the
Campbeltown Emergency Response Exercise
in November 2021 and undertook an
operational tour of Oban Harbour in
September 2021.   
Observation – the Council is encouraged to
arrange an opportunity in 2025 for the Duty
Holder and Board to visit one of the
Authority’s ports, harbours or piers.     
Recommend – to provide awareness of the
Council’s ports, harbours and piers, arrange
an annual visit for the Duty Holder and
Board.  
MJS_001 MJS
Page 39

Page 40

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 13
PMSC / GtGP
Reference Subject Evidence Required
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
Cont.   
1.10
Cont.   
The Duty Holder
Has the Duty Holder
(Harbour Board members)
been provided with a clear
brief or training on their
role under the requirements
of the Code?
Satisfactory – four (of the eight) Councillors of
the Harbour Board, plus the Council’s
Executive Director of Development and
Infrastructure Services (as Duty Holder) have
attended training.   
Observation – not all Councillors on the
Harbour Board have attended Duty Holder
training, the Marine Safety Plan has an
objective of 100% attendance.   
Recommend – that members of the
Harbour Board who have not attend Duty
Holder training, complete this training as
soon as practical.    
MJS_011 
https://www.arg
yll-
bute.gov.uk/mo
derngov/mgCo
mmitteeDetails.
aspx?ID=567
MJS
1.11-1.12 The Designated
Person
Has the Harbour Authority
appointed an individual as
the Designated Person?  
Satisfactory – the Duty Holder has appointed
ABPmer to provide Designated Person
services, with Monty Smedley as the named
Designated Person.  This contract
commenced on 01 November 2021.  The
Designated Person’s contact details are
hosted on the Council’s website.     
https://www.arg
yll-
bute.gov.uk/site
s/default/files/2
023-
05/dp_contact_i
nformation3_ab
c.pdf
MJS  
Is the Designated Person’s
role explained in the
MSMS?
Satisfactory – the MSMS, Section 2.0 lists the
duties of the Designated Person.    
MJS_001 MJS
1.13 Chief Executive
[or equivalent]]
Have executive and
operational responsibilities
for marine safety been
clearly assigned?
Satisfactory – the MSMS, Section 1.6.1 lists
the responsibilities of the ‘Head of Roads and
Infrastructure Services’, and Section 1.6.2 lists
the responsibilities of the ‘Marine Operations
Manager’.     
MJS_001 MJS  
How is marine safety
funded within the
organisation?
Satisfactory – funding is identified and agreed
through the Council’s approvals process. 
Officers of the Authority have delegated
spending powers within their spending limits. 
All significant funding decision outside of
spending limits come to the Harbour Board,
officers of the Authority provide technical
input to Harbour Board decisions.   
n/a MJS
Page 40

Page 41

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 14
PMSC / GtGP
Reference Subject Evidence Required
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
1.9, 
1.14 – 1.15
Harbour Master Have executive and
operational responsibilities
for marine safety been
clearly assigned?
Satisfactory – the MSMS, Section 2.5 states
that: “Harbour Masters and their Assistants are
appointed by the Harbour Authority to support
the Marine Operations Manager to develop the
team’s service plans by working in partnership
with colleagues (within and out with the
service) and by taking personal responsibility
for planning how these are delivered effectively
and efficiently”.  Section 1.6.4 lists specific
duties.  Additionally, A&BC also appoints Pier
Masters in selected locations, the duties of
which are identified in Section 1.6.5.   
MJS_001 MJS  
Does an officer with
responsibilities for marine
safety attend Board
meetings?
Satisfactory – three times a year, a report is
provided by the Executive Director with
responsibility for Roads and Infrastructure
Services; major issues are raised to the
Harbour Board.  Evidence from the Harbour
Board meeting of 12 September 2024
provided.     
MJS_012
MJS_013 
https://www.arg
yll-
bute.gov.uk/mo
derngov/ieListM
eetings.aspx?Co
mmitteeId=567
MJS
1.16 – 1.17 The
Organisation’s
Officers
Does the MSMS provide
details of the organisation’s
Officers and their
responsibilities for marine
safety?
Satisfactory – the MSMS, Section 1.6.3 lists
the responsibilities of the Marine Technical
Officer, and Section 1.6.6 provides detail on
the Council’s Assistant Harbour Masters.     
MJS_001 MJS  
Page 41

Page 42

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 15
A.2 PMSC Section 2 – Key Measures Needed to Secure Marine Safety
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
2.2 Further
guidance
Does the organisation
review any of the following:
 MAIB digest / reports
 MCA health check trends
Satisfactory – the MCA Health Checks trends
was included in the Designated Person’s
briefing note which was tabled at the
02 September 2021 Harbour Board meeting. 
Information from the MAIB and the BPA in the
former of safety circulars are distributed by
the Marine Operations Admin Officer.   
MJS_014 MJS
2.3 – 2.6 Review existing
powers
Does the Harbour Authority
have an understanding of
local legislation?
Satisfactory – the Harbour Authority has a list
of local Acts and Orders for Campbeltown.   
MJS_010 MJS  
Are local Acts and Harbour
Orders referenced in
MSMS?
Satisfactory – the MSMS, Section 3.2, has a list
relevant local Acts or Orders.  Campbeltown
has local copies.   
Observation – Bruichladdich Pier is missing
from the list in Section 3.2.   
Recommend – adding Bruichladdich Pier,
by virtue of the ‘Islay Piers Order 1904’, into
Section 3.2.  
MJS_001 MJS  
Have the Harbour
Authority’s existing powers
been reviewed?
Satisfactory – the Harbour Acts have been
reviewed by A&BC lawyers. 
Recommendations for update have been
presented to the Council and a Harbour
Revision Order (HRO) consolidation process
initiated.  Evidence provided.   
MJS_015
MJS_016
MJS_017
MJS  
Is the organisation’s
jurisdiction mapped and
clear?
Satisfactory – the Harbour Authority has a list
of local Acts and Orders for Campbeltown,
plus a map with the extent of the harbour
limits shown.   
Observation – the harbour limits on the chart
(Admiralty Chart Number 1864 ‘Harbours and
Anchorages in Arran and Kintyre’,
Campbeltown Loch Panel C) does not match
the information held by Marine Scotland.  The
Campbeltown Harbour Order 1846,
Schedule 38 defines the limits at the Loch
entrance, but is silent (does not mention)
limits between Island Davaar and the
mainland of Kintyre.   
Recommend – there is a discrepancy
between the charted limits between the
Island Davaar and the mainland of Kintyre
limits on UK Hydrographic Office (UKHO)
products, and information held by Marine
Scotland (which shows the limits as
following ‘The Doirlinn’ causeway.  The
Campbeltown Harbour Order 1846,
Schedule 38 is silent on this boundary.  This
should be raised with the UKHO.  
MJS_010
MJS_018
MJS
Page 42

Page 43

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 16
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
2.7 – 2.11 Use of Formal
Risk Assessment
(FRA)
Have risks associated with
marine operations been
assessed and a means of
controlling them deployed?
Satisfactory – the MSMS, Section 5 describes
the assessment methodology.  A set of 15 risk
assessments are in place for the harbour.  The
hazard scenarios cover a range of foreseeable
eventualities including: Contact with
structures, Collisions, Grounding/Stranding,
Equipment Failure, Event Management and
Fire/Explosions.   
Observation – many of the assessment review
dates are set for January or February.   
Recommend – that a staggered approach
to risk assessment review is adopted, on a
cyclic basis, over the year.  
MJS_001
MJS_019
MJS  
How does the organisation
ensure those undertaking
marine risk assessment are
competent in the role?
Satisfactory – the Harbour Master has
undertaken a training course for marine risk
completed on 05 April 2016, certificate
evidenced.   
Observation – the Deputy Harbour Master
managed the day-to-day updates to the risk
assessments and has not attended specific
training on MARNIS software.   
Observation – there is no dedicated training
course for Marine Risk Management, evidence
from audits suggests that staff skill sets in this
area are usually evidenced through previous
training (for example, Certificates of
Competence as deck officers, or academic
training courses).  Whilst it is expected that
the recruitment process will identify these as
desirable qualifications, there is no recognised
route for obtaining these which is promoted
by A&BC.   
Recommend – at the next opportunity, the
Deputy Harbour Master should attend
marine risk and MARNIS user training. 
Recommend – a training course, or process
for obtaining suitable qualification(s) in
Marine Risk Management is considered. 
This should include Marine Risk
Assessment, management of risk controls
and accident-incident reporting and
investigation processes.  
MJS_020 MJS  
Are stakeholders included
in marine risk
review/assessments?
Satisfactory – risk assessments are conducted
with the active involvement of the Pier
Operatives.  Tool box talks are held and
recorded, this is considered best practice.   
Observation – whilst Council staff are actively
engaged in marine risk assessment reviews,
there is limited evidence of wider stakeholder
consultation and engagement in the risk
review and assessment process.   
Recommend – the experience and
knowledge of harbour users should be
sought, and their engagement documented
in marine risk assessments.  
MJS_019
MJS_021
MJS
Page 43

Page 44

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 17
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
Cont.   
2.7 – 2.11
Cont.   
Use of Formal
Risk Assessment
(FRA)
Does the MSMS prescribe
the review frequency for
risk assessments?
Satisfactory – the MSMS, Section 5.1.3 states
that: “Navigational risk assessments are
maintained for the main ports and harbours as
a minimum. The regular (annual) review of
these risk assessments and any new risk
assessments caused by operational changes
will identify new risks”.   
MJS_001 MJS  
Is a system of Dynamic Risk
Assessment (DRA) used?
Satisfactory – the MSMS, Section 5.2 provides
information on the DRA requirement.  A&BC
has a DRA flowchart to aid decision making.   
MJS_001
MJS_025
MJS
2.12-2.14 Implement a
MSMS
Is there an MSMS?  Does
this incorporate policies
and procedures?  The
MSMS must incorporate a
regular and systematic
review of its performance.
Satisfactory – A&BC’s Marine Safety
Management System (MSMS), ‘Policies and
Statements’, Volume 1, revision 02, issued
21 March 2024.  A revision history table is
included, with a draft noted as being issued in
January 2023.  The MSMS was approved by
the Harbour Board on 21 March 2024.  The
MSMS, Section 7.1 under the sub-heading
‘periodic review’ identifies that: “Additional to
the above the Marine Safety Management
System will be reviewed and reissued by the
Marine Operations Manager every three years.” 
Standard Operating Procedures (SOPs) are
authored by the port and held as a catalogue. 
Evidence sighted.   
Observation – the MSMS on A&BC’s website
is Revision 02, however the front page and
headers are dated November 2023.   
Recommend – the MSMS date on the front
cover and footers is updated to match the
revision number in the Document Record.  
MJS_001
MJS_022
MJS_023
MJS_024
MJS_028
MJS
2.15 Key
Performance
Indicators (KPIs)
Does the harbour authority
detail KPIs and/or make a
statement about
performance in the
organisation’s annual
report?
Satisfactory – A&BC’s key performance
indicators are detailed in the ‘Marine Safety
Plan’ as standing objectives, these are
measured and reported on annually with the
outcome recorded in the published plan.  The
MSMS, Section 9.1 provides information on
active and reactive system measurements.   
MJS_001
MJS_007
MJS
2.16 MSMS assigning
responsibility
Does the MSMS explicitly
assign responsibility for
appropriate
safety/conservancy
matters?
Satisfactory – the MSMS, Section 1.6 ‘Marine
Operational Management Structure’ details
the assignment of responsibility to key
officers of the Authority.   
MJS_001 MJS
Page 44

Page 45

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 18
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
2.17 MSMS
Consultation
Are forum/consultation
meetings held? 
Satisfactory – the ‘Navigational Safety,
Pilotage and Towage Policy’ states that A&BC
will: “Consult widely with port and other
relevant stakeholders in respect of navigational
safety issues.”  Active engagement occurs as a
day-to-day process at Campbeltown, there is
an open-door policy, with discussion at the
quayside and at the harbour office.  Harbour
meetings have been held previously in person
and over MS Teams.   
Observation – in Campbeltown, there are a
number of distinct user groups, but no clear
engagement strategy: 
 The Royal National Lifeboat Institute (RNLI).
 The Marina
 The Oil & Pipelines Agency (OPA)
 The Fishermen’s Association
 CalMac Ferries Limited (CFL)
 Independent operators. 
Observation – the MSMS does not provide
information on stakeholder engagement
processes. 
Recommend – the engagement with
harbour user groups is considered and
written down as a strategy that can be
delivered systematically, with the recording
of meetings/discussion and any actions
from these.   
Recommend – a section addressing
stakeholder consultation is added to the
MSMS.  
MJS_001
MJS_002 
Anecdotal
MJS
2.18 Competence
standards
Are personnel qualified and
trained for their marine
safety role?   
Satisfactory – training records are held
centrally in MHR iTrent.  A&BC uses a
dedicated harbour training matrix which
identifies the skill set needed by at each
location.  Many of the training courses are
accessed on the online e-learning platform
‘LEON’.  Induction and training records were
sampled for Campbeltown staff.  On training,
the MSMS, Section 8.1 states: “The Marine
Operations Department shall maintain a
training matrix for all staff and the respective
line managers are responsible for keeping it
up-to-date. The training matrix and training
records is held and maintained centrally”.   
MJS_001
MJS_003
MJS_026
MJS_027
MJS_047 
https://www.arg
yll-
bute.gov.uk/my
-council/leon-e-
learning
MJS  
Is there a policy on
revalidation or maintenance
of qualifications in place?
Satisfactory – a Marine Training Policy is in
place, dated v1 August 2023, and available for
download from the A&BC website.   
MJS_003 MJS
Page 45

Page 46

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 19
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
2.19 – 2.22 Incident
reporting and
investigation
Does the MSMS identify
the organisation’s
instruction regarding:
 reporting
 recording of incidents
 investigation
 enforcement (if relevant). 
Satisfactory – the MSMS Section 4.5 details
the process to follow should an incident
occur; this addresses investigation and
reporting.  Evidence of the sailing vessel
Encore grounding, and the ferry Loch Ridden
grounding (on the slipway) sampled.  The
following provides a summary of totals per
year: 
 2 incidents – 2024 (to date)
 2 incidents - 2023
 3 incidents - 2022
 2 incidents – 2021
 0 incidents – 2020
 6 incidents – 2019 
MJS_001
MJS_029
MJS_030 
Paper based
office records
MJS
GtGP 13.2 Incidents
involving Death
or Crime
Are procedures in place for
incidents involving death or
crime?
Satisfactory – the MSMS, Section 4.6 details
actions to be taken in the event of death or
crime.  Deaths have occurred in the harbour
(attributed to mental health issues) plus
vandalism.  Liaison with the Policy is verry
good, with officers based in Campbeltown
and visiting the harbour office periodically.   
MJS_001 
Anecdotal
MJS
GtGP 13.9 Incident
publication
Does the Harbour Authority
disseminate information
from accident
investigations?
Satisfactory – the MSMS, Section 4.8 details
statutory reporting requirements, incident
reports are distributed to the Scottish
Environment Protection Agency (SEPA) and
the MCA.   
MJS_001 
Anecdotal
MJS
2.23 Incident
statutory
reporting
Are procedures for
reporting incidents to the
MAIB in place?
Satisfactory – the MSMS, Section 4.8 details
statutory reporting requirements, including
the Marine Guidance Note (MGN) 564
‘Incident reporting and investigation’.  There
have been no MAIB reportable incidents at
Campbeltown.   
Observation – anecdotal discussion identified
that harbour staff considered it the role of the
Coastguard and/or vessel Master to report
relevant incidents to the MAIB.   
Recommend – a reminder is provided to
Council harbour staff that MAIB reporting is
a requirement of the Harbour Authority. 
The MARNIS reporting flow-process may
assist in identifying reportable incidents.    
MJS_001 MJS
Page 46

Page 47

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 20
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
2.24 Monitoring
performance
and auditing
Has the MSMS been
subject to audit (internal
and/or external)?
Satisfactory – the last external audit of the
MSMS was conducted in 2023.  The MSMS,
Section 7.2 and 7.3 detail the audit process for
A&BC.  Internal audits are arranged for PMSC
and Health and Safety, evidence of periodic
auditing was provided.   
Observation – there is no internal audit
schedule, audits are arranged to meet specific
requirements.   
Recommend – A&BC develop a schedule of
internal audits that test the application of
the MSMS and SOPs at each port location.  
MJS_001
MJS_031
MJS_045
MJS_046
MJS
2.25 Enforcement Are local officers aware of
enforcement powers and
responsibilities?
Satisfactory – the MSMS, Section 4.9 provides
the enforcement procedure.   
MJS_001 MJS  
Is there a policy on
enforcement and
prosecution in place?
Satisfactory – A&BC publish an Enforcement
and Prosecution policy, as Version 1, dated
August 2023.    
MJS_004 MJS
2.26 Publication of
plans and
reports
Does the organisation
commit itself to developing
policies and procedures to
satisfy the requirements of
the Code? 
Satisfactory – this requirement is evidenced
through the publication of Navigational
Safety, Pilotage and Towage Policy’ and its
Marine Safety Plan, published on A&BC’s
website. 
MJS_002 MJS
2.27 Plan assessment Is an assessment of the
organisation’s performance
against the plan published?
Satisfactory – the Marine Safety Plan contains
an ongoing assessment of the plan.   
MJS_007 MJS
2.28 Safety plan for
marine
operations
Is a ‘Safety Plan for Marine
Operations’ published
(every three years).   
Satisfactory – the ‘Marine Safety Plan’ was
approved for issue by the Harbour Board on
021 March 2024, and is included as an annex
to the Board meeting.  The Marine Safety Plan
is hosted on the A&BC’s website.  The plan
covers the years 2024 to 2026 and includes
objectives with measures reported in yearly
intervals.   
MJS_007 
https://www.arg
yll-
bute.gov.uk/mo
derngov/ieListD
ocuments.aspx?
CId=567&MId=
15635&Ver=4 
MJS
2.29 Consensus Has the Harbour Board
maintained consensus with
harbour users?
See response in this Audit report, Section 2.17
on Consultation.     
n/a MJS
Page 47

Page 48

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 21
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendation Evidence
Reference Auditor
2.30 – 2.32 Monitoring
compliance
Has the Harbour Authority
confirmed compliance with
the PMSC for the port to
the MCA within the last
three years?
Satisfactory – A&BC wrote to the MCA on
10/03/21 to confirm its current state of
compliance with the Code.  Letter evidenced. 
The DfT list of ports reporting compliance
does not include A&BC ports, harbours or
marine facilities.  This position has been taken
by the DfT, guided by the MCA, as the Council
has confirmed it was not (at that time) fully
compliant with the requirements of the Code. 
At the time of writing the letter A&BC was
working towards full compliance in a number
of key areas, including legislation review,
policy review, MSMS documentation and
creation of Standard Operating Procedures
(SOPs). 
MJS_032 
https://www.go
v.uk/governmen
t/publications/p
ort-marine-
safety-code-
compliant-
ports/port-
marine-safety-
code-
compliant-
ports-list 
MJS
GtGP 2.2.3
(also, Code
Executive
Summary)
Monitoring
compliance
Has the Harbour Authority
confirmed all organisations
with its jurisdiction comply
with the requirements of
the Code?
Satisfactory – there is one other organisation
that operates a facility in the harbour, this is
the North Atlantic Treaty Organization (NATO)
fuelling terminal.  The terminal is owned and
operated by ‘The Oils & Pipelines Agency’
(OPA).  Dialogue on PMSC compliance has
been conducted on 08 May 2024. 
Additionally, pilotage issues have been
discussed with the Ministry of Defence (MOD)
via the King’s Harbour Master (KHM) in the
Clyde.   
Observation – a formalised exchange of
information and notification process of PMSC
Compliance to/from the OPA could not be
evidenced.   
Recommend – the exchange of information
and requests on PMSC Compliance is
retained by A&BC.  This should include any
shared risk assessments, SOPs, emergency
plans and exercises.  
Anecdotal MJS  
Page 48

Page 49

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 22
A.3 PMSC Section 3 – General Duties and Powers
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
3.1 – 3.4 Safe and
Efficient Port
Operations
Does the Duty Holder have
regard to efficiency,
economy and safety of
operation in respect to the
services and facilities
provided?
Satisfactory – the MSMS, Section 9.0 ‘Marine
Safety Plan’ outlines the requirements from
the Code and points to the ‘Marine Safety
Plan’ to deliver this requirement.  The Marine
Safety Plan states that: “The Council, as
Harbour Authority, recognises that is has a
duty of care to those using it ports, harbours
and piers; which means the Council has an
obligation for safe and efficient use of its
marine facilities.  To this end, Argyll & Bute
Council’s Harbour Board has approved a set of
policies in support of the management and
regulation of marine operations at our facilities
which are embedded in the MSMS.” 
MJS_001
MJS_007
MJS
3.5 Open port duty Is the port or harbour
subject to Open Port Duty’?
Satisfactory – the HDPCA has been
incorporated into the Campbeltown Burgh
and Harbour Act’, 1876, Section 5.  It is
therefore assumed that Open Port Duty
applies to Campbeltown Harbour.   
Observation – as only part of the 1876 Act is
available, it cannot be fully ascertained if
Section 33 of the 1847 HDPCA has been
incorporated (or not).   
Recommend – the full 1876 Act is obtained
from Parliamentary Archives Section 5 is
reviewed to understand which parts of the
1847 Act have been incorporated.  
MJS_010 MJS
3.6 – 3.6 Conservancy
duty
How does the harbour
authority conserve the
harbour?:
 Survey as necessary
 Place navigation marks
 Keep ‘vigilant watch’ for
any seabed changes
 Keep hydrographic
records
 Ensure hydrographic
information is published
 Update UKHO.  
Satisfactory – the MSMS, Section 10.0
providing information on the Council’s
approach to conservancy.  This includes
conservancy duty, hydrographic survey policy,
dredging, Aids to Navigation (AtoN), wreck
removal, dangerous vessels and licensing
marine works.  The MSMS, Section 10.1 details
hydrography, with the last bathymetric survey
was conducted on 12 August 2022. 
Information was passed by the survey
contractor to UKHO, evidence seen.   
MJS_001
MJS_033
MJS
Page 49

Page 50

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 23
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
3.7 Updates
provided to
UKHO
Does the organisation have
an Agreement with UKHO,
and/or do they provide
survey information to
UKHO?
Satisfactory – a bilateral agreement between
A&BC and the UKHO is in place, dated
17 March 2017.   
MJS_034 MJS
GtGP 1.9.11,
and 7.8
Licensing,
Regulating
Harbour Works
and Dredging?
Does the harbour authority
have the power to licence
works?  
Satisfactory – there is no evidence that A&BC
as Harbour Authority at Campbeltown has any
powers to licence third party marine works
under its local Acts and Orders.  Mooring
licences are required for individual and
commercial moorings, via the Crown Estate,
with navigation consent required from A&BC
as the SHA.   
MJS_010
MJS_052
MJS_053
MJS_054
MJS
3.8 Environmental
duty
Does the Organisation
understand its obligations:
 Nature conservation
Section 48A of Harbours
Act 1964
 Obligations for SPA, SACs
under Habitat Regs.  
 the Nature Conservation
(Scotland) Act 2004
Satisfactory – the MSMS, Section 3.1 lists
National legislation, including several Acts
relating to Environmental Duties.  These
requirements are delivered through the
Harbour’s services, including the Local Port
Service (LPS) which monitors and advises
vessel Masters and members of the public. 
A&BC also issue a ‘Marine Conservancy and
Hydrographic Policy’, Version 1, issued August
2023 which has links to environmental duties. 
Information regarding Campbeltown and its
local habitat is contained in the Oil Pollution
Response plan.   
MJS_001
MJS_005
MJS_035
MJS
3.9 Civil
Contingency
Duty 
Does the MSMS include
reference to the Harbour
Authority’s obligations as a
Category 2 responder? 
Satisfactory – the MSMS includes reference to
Civil Contingency duties within supporting
port, harbour and pier Annexes.   
MJS_001 MJS
GtGP 6.2.4,
6.5
Emergency
Planning /
Pollution
control
Does the MSMS include
emergency planning and oil
pollution response?
Satisfactory – an Oil Pollution Response Plan
is in place, which was approved by the MCA
on 30 September 2023 and is valid until the
26 January 2029.  The annual OPRC return
form was evidenced.  A&BC maintain a Critical
Activity Recover Plan (CARP) which
incorporates the Council’s Civil Contingency
duties.  Campbeltown has an emergency plan.   
MJS_035
MJS_036
MJS
Page 50

Page 51

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 24
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
Cont.   
GtGP 6.2.4,
6.5
Cont.   
Emergency
Planning /
Pollution
control
Does the port/harbour carry
out emergency plan
exercises?
Satisfactory – a training exercise for oil
pollution was carried out for A&BC in
Campbeltown on 23 November 2021, as
operation ‘Smerby’.  Evidence provided.  In
Campbeltown, exercise ‘Mount Stuart’ was run
in September 2023 as a multi-agency
emergency response test.  Post exercise
report provided.  An emergency plan schedule
was evidence.    
MJS_037
MJS_038
MJS_039
MJS_040
MJS
3.10 – 3.11 Harbour
Authority
Powers review
Has the Harbour Authority
reviewed its powers?
See the audit report response in Section 2.3 –
2.6.   
n/a MJS
3.12 – 3.14 Revising Duties
and Powers
Evidence of Harbour
Revision Orders, or Harbour
Closure.  
Satisfactory – the last HRO was made in 2011,
for the powers to construct works and carry
out dredging. 
MJS_010 MJS 
Page 51

Page 52

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 25
A.4 PMSC Section 4 – Specific Duties and Powers
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
4.2 Appointment of
Harbour Master
Is there a Harbour Master
appointment for the port?
Satisfactory – a letter of appointment as the
Campbeltown Harbour Master is held, date of
appointment 02 September 2022.    
MJS_042 MJS
4.3 – 4.5 Byelaws Does the organisation have
powers to make Byelaws,
are these published?
Satisfactory – under the ‘The Campbeltown
Harbour Act and Orders 1846 to 2011’
Byelaws powers are available.  To date, no
Byelaws have been issued.     
MJS_010 MJS  
Date of last byelaw review? Not applicable – no byelaws have been issued    n/a MJS
4.6 – 4.7 Special
Directions
Are the Harbour Master’s
powers of Direction shown
in the MSMS, how is
delegation identified?
Satisfactory – the MSMS, Section 5.1.1, details
the use of Special Direction stating: “Special
directions – may be given by the harbour
master, deputies or their assistants: these
directions are time and vessel specific and are
apt for operational purposes of short duration
and for emergencies”.   
Observation – there is no SOP detailing how
Special Directions are given or recorded by
the Harbour Master, relayed via LPS, or
otherwise.     
Recommendation – an SOP for the use of
Special Directions is drafted and agreed. 
This should detail the giving of the
direction and its recording.    
MJS_001 MJS
4.8  General
Directions
Are the powers of General
Directions available to the
Harbour?
Not applicable – powers of General Direction
are not available.   
Auditor note: the harbour has a set of
Navigational Guidelines, which are in draft,
with the intention of issuing these until
powers of General Direction are available.   
n/a MJS
4.9 Harbour
Directions
Are Harbour Directions
used and published?
Not applicable – Harbour Directions have not
been applied for.   
n/a MJS
4.10
GtGP 6.4
Dangerous
Vessels
Does the MSMS (or other
plan) make provision for
giving directions to
dangerous vessels?
Satisfactory – the Harbour Master has powers
under the Dangerous Vessels Act 1985.  This is
listed in the MSMS, Section 3.1 under
‘National Legislation’.  Additionally, Section
5.1.1 of the MSMS states: “Dangerous vessel
directions - permitting a Harbour Master to
remove a vessel from the harbour in clearly
defined circumstances”.   
MJS_001 MJS
Page 52

Page 53

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 26
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
Cont.   
4.10
GtGP 6.4
Cont.   
Dangerous
Vessels
Is the role of the Secretary
of States' Representative
for Maritime Salvage and
Intervention (SOSREP)
acknowledged?
Satisfactory – the MSMS, Section 4.4.3 details
the role of the SOSREP.   
MJS_001 MJS
GtGP 6.2 Dangerous
Substances
Are there clear
requirements for
declaration of dangerous
goods/substances? 
Satisfactory – the MSMS, Section 4.4.4 details
the entry and control of dangerous goods and
substances in the harbour.  The Council’s
website contains reporting forms for
‘Dangerous Good Notification Procedures’.  At
Campbeltown, CalMac (as ferry operator)
manages the dangerous goods notification
process if a ferry uses the terminal.    
MJS_001 
https://www.arg
yll-
bute.gov.uk/site
s/default/files/
migrated_files/d
angerous_good
s_notification_pr
ocedures_may_2
020.pdf 
MJS
GtGP 8.4 Vessel Traffic
Management
Is vessel traffic managed
within the port area, how is
this achieved? 
Satisfactory – vessel traffic is monitored and
managed through: 
 Visual observation and communications by
Very High Frequency (VHF) Channel 13,
phone and email.  
 Pre-arrival notification is used for any vessel
over 80 m Length Overall (LOA).  
 Under 80 m are booked in via the desk
diary.  
 LPS office, staffed by Port Operatives
between 07:00-16:00 hr.  Vessels pre-
notified are met by Port Operatives (for line
handling).  Out of hours, there is a duty
Harbour Master.  The harbour team use
WhatsApp for quick communications as a
group.   
Observational MJS  
Is vessel traffic monitoring
information passed to the
MCA by the quickest
means?  
Satisfactory – A&BC has a CERS login,
evidence of a completed CERS logbook
provided for the vessel ‘Island Spirit’ on
04 September 2024 seen.     
Observational MJS
Page 53

Page 54

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 27
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
Cont. 
GtGP 8.4
Cont. 
Vessel Traffic
Management
Has the need for VTS/LPS
been reviewed recently?  
Satisfactory – the current method of vessel
traffic management has been arranged to
meet the demands of harbour use.  The
harbour is staffed every day, between 07:00-
16:00 hr, every day except Christmas Day and
New Year’s Day (an on-call duty process is
used out of hours).   
MJS_007 
Observational
MJS
GtGP 13.2.2 Drink and drugs Do staff know what to do if
they suspect that a mariner
(master, Pilot, seaman) has
committed an offence
whilst on duty? 
Satisfactory – the MSMS, Section 3.1
references the Railways and Transportation
Safety Act (RATSA) 2003.  A&BC has a Drink
and Drugs Policy for its own staff.   
Observation – there is no specific instruction
on the actions to take if a professional
mariner is suspected of a drink or drugs
offence when on duty.   
Recommend – the creation of an SOP or
procedure to inform the Authority’s officers
of their expected action for a drink or drugs
offence under the RATSA 2003 Act.  
MJS_001 MJS
4.11 
GtGP 9.0
Pilotage  Conformity with Pilotage
Manual and Policies
Satisfactory – one of the audit team
accompanied the Class 1 Maritime Ltd
Authorised Campbeltown Pilot on the
inbound passage of vessel MV Runner (21 July
2024).  Prior to the passage, the auditor
observed the Risk Assessment and Tool Box
Talk for the boat crew and mooring party and
the Pilot populate the Master/Pilot Exchange
(MPX).  The Pilot boarding was undertaken in
compliance with best practice.  The MPX was
accurately handled.  During the pilotage, it
was noted that information exchange
continued.  The vessel was berthed safely
without issue.  It was evidenced by the auditor
that the harbour benefits from the experience
and training provided by Class 1 Maritime Ltd
(as a contracted Pilotage Service provider).
This affords the harbour a very high level of
Pilot competence. Good working relationships
between the Class 1 Maritime Ltd Pilots and
the Harbour Master and operations teams was
observed.  Delivery of Pilotage Duty is
considered to be an area of best practice.   
RAL_010
RAL_011
RAL_012
RAL_013
RAL_014
RAL_015
RAL_016
RAL_017
RAL_018
RAL_019
RAL_020
RAL_021
RAL_022
RAL_023
RAL_024
RAL_025
RAL_031
RAL_032
RAL
4.11 
GtGP 9.0
Pilotage Is the port a CHA? Satisfactory – A&BC, as Harbour Authority, is
identified as a Competent Harbour Authority
(for Pilotage).   
RAL_006 RAL
Page 54

Page 55

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 28
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
Cont.   
4.11 
GtGP 9.0
Cont.   
Pilotage
Has the requirement for
pilotage been reviewed?
Satisfactory – Pilotage was reviewed and
informed the 2007 order; the Pilotage Manual
and Pilotage Directions were first drafted in
2011. 
Observation – there is evidence that Pilotage
has been reviewed in 2021 when the Pilotage
Manual (including Pilotage Directions) was
updated.  It is understood there has been
recent reviews of both the compulsory
pilotage LOA for vessels inside the enclosed
harbour and overall provision at the fuel jetty. 
Recommend – A&BC, as CHA, formally
review the need for Pilotage.  This is an
expectation of both the Pilotage Act 1987
and the PMSC.  
RAL_008 
Anecdotal
RAL
4.12
GtGP 9.4
Pilotage
Directions
Are Pilotage Directions
issued?
Satisfactory – Pilotage Directions sit within the
(Pilotage Manual) there is a concise reference
to Pilotage on the A&BC website, which
states: “Pilotage is compulsory for inbound and
outbound vessels 80 m and over”.   
Observation – it is understood that a request
has been made for Pilotage Directions to be
published in full on the A&BC website.  At the
time of audit, there was no evidence this has
been done.  Pilotage Directions are
enforceable and should be promulgated to
stakeholders to promote clear understanding.
This is a requirement under the Pilotage Act
1987.   
Recommend – A&BC, as CHA must publish
a controlled copy of the Pilotage Directions
for Campbeltown on its website.  The
directions should only be published once
they have been consulted upon by users of
the harbour.  Information in the Pilotage
Manual with any additional information
that refers to Pilotage (for example PEC and
boarding and landing operational
information) may be included in Pilotage
Direction schedules so this information can
be updated outside of formal Pilotage
Direction consultation requirements.
RAL_008 
https://www.arg
yll-
bute.gov.uk/roa
ds-and-
travel/marine-
services/campb
eltown-harbour
RAL
Page 55

Page 56

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 29
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
Cont.   
4.12
GtGP 9.4
Cont.   
Pilotage
Directions
Were stakeholders
consulted during the
drafting phase of the most
recent Pilotage Direction?
Satisfactory – there is anecdotal evidence of
consultation on the first draft of the Pilotage
Directions.  More recently, the Ministry of
Defence (MOD) has been consulted in respect
to the changes at the NATO fuel jetty and
vessel agents in respect to the docks.   
Observation – there is no evidence of formal
consultation on the Pilotage Directions.   
Observation – the Pilotage Directions refer to
both a requirement for all vessels: “carrying
dangerous or polluting substances in bulk as
defined in the Dangerous Substances in
Harbour Areas Regulations 1987 and all vessels
which are not gas free” as requiring
compulsory pilotage.   
Observation – the Pilotage Directions state:
“vessels which have Crown Immunity are
exempted. For the purposes of Pilotage and
Towage they operate in Campbeltown under
the auspices of the Queen’s Harbour Master,
Faslane but adhere to the general guidelines
for operations within the Loch at
Campbeltown”.  The Pilotage Act 1987 does
not provide immunity for Crown vessels.  This
was previously the case (under the Pilotage
Act 1913).  A&BC, as CHA, may choose to
exclude MOD vessels from the requirements
of Pilotage, if supported through a risk-based
decision.   
Recommend – A&BC, as CHA, formally
consult on the Pilotage Directions. 
Evidence of consultation should be retained
for later reference.  This is a requirement
under the Pilotage Act 1987.   
Recommend – the Dangerous Substances
in Harbour Areas Regulations 1987 were
replaced by the ‘Dangerous Goods in
Harbour Areas Regulations’ 2016 (DGHAR). 
Recommend – it is recommended that
A&BC, as CHA, formally review the need for
Pilotage, including the provisions for MOD
vessels using the harbour with respect to
Pilotage.  There may be scope for an MOD
Pilot to accompany the A&BC Authorised
Pilot in circumstances that the A&BC CHA
Pilot has ‘conduct’ of the vessel within the
definition of the Pilotage Act 1987.
RAL_008 
Anecdotal
RAL
Page 56

Page 57

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 30
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
Cont.   
4.12
GtGP 9.4
Cont.   
Pilotage
Directions
Cont.   
Were stakeholders
consulted during the
drafting phase of the most
recent Pilotage Direction?
Observation – it is understood that the
Harbour Master, from time-to-time requests
that vessels less than 80 m LOA take a Pilot
due to the manoeuvre being perceived as
challenging and the master not being familiar
with the CHA area.  This circumstance is not
defined in the Pilotage Directions.   
Observation –the Pilotage Directions make no
reference to how the Directions apply to Tugs
and Tows. 
Observation – the Pilotage Directions refer to
all vessels “which is deemed by the Harbour
Master to be a danger or threat to the safe
operation of the harbour due to defects,
damage or handicap may be required to take
the services of a Pilot even if exempted by size
under the provisions of these Pilotage
Directions”.  This is a helpful ‘catch all’ clause
but does not, on its own, cover all
circumstances that the Harbour Master may
wish to have a Pilot onboard of a vessel.  For
example, the recent consideration of Pilotage
for vessels under 80 m within the enclosed
docks, both generally and in in specific
weather conditions.
Recommend – the Pilotage Directions must
contain relevant instructions for all
circumstances, vessels less than 80 m LOA
requiring a Pilot if considered necessary by
the Harbour Master.  For example, wording
may read: “all vessels or tows of more than
60.00 meters but less than 80.00 meters in
length overall where a bona fide deck officer
has not navigated the port on that vessel or
a vessel of a similar class in the past 12
months, will use the services of an
Authorised Pilot”. 
Recommend – A&BC, as CHA, should
review and consult the requirement for the
Pilotage Directions to apply to Tugs and
Tows. 
Recommend – A&BC, as CHA, should
review this clause of the Pilotage Directions
so as not to limit the circumstances the
Harbour Master can enforce compulsory
pilotage.  For example, including weather
and ‘any other reason’.
RAL_008 
Anecdotal
RAL
Page 57

Page 58

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 31
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
4.13 
GtGP 9.4
Authorisation of
pilots
Is the process for
appointing Pilots
referenced in the MSMS?  
Satisfactory – the following is noted on Pilot
appointment: 
 A&BC, as CHA, has responsibilities for
pilotage which are set out in the MSMS,
Section 4.3.  
 The intent to appoint competent and
authorised Pilots is set out in the
Navigational Safety, Pilotage & Towage
Policy (August 2023).  
 The specifics of the process for appointing
Pilots are set out in the Pilotage Manual
section 10 (2021).  
 The CHA, whilst retaining the duty to keep
pilotage under review (Section 2 of the
Pilotage Act 1987), has contracted to
Class 1 Maritime Ltd, in respect to the
provision of the actual Pilotage and craft
required for boarding and landing of pilots.
 Pilot Authorisations are made on behalf of
the CHA by the appoint Harbour Master for
Campbeltown, on behalf of the Harbour
Authority.  The auditor has been provided
evidence of Pilot authorisations. 
RAL_001
RAL_007
RAL_008
RAL_029
RAL_030
RAL
4.14
GtGP 9.4.31
Pilot Training Does the CHA implement
the International Maritime
Organisation (IMO)
Resolution A960? 
Satisfactory – A&BC, as CHA, in contracting
Pilotage from Class 1 Maritime Ltd, benefit
from the comprehensive underpinning
knowledge and training program of Forth
Pilots (Class 1 Maritime Ltd is a company
owned by Authorised Forth Pilots). Forth Ports
has International Standard for Marine Pilotage
(ISPO accreditation) which included the
adoption of A960 principles.  Section 10 off
the Navigational Safety, Pilotage & Towage
Policy (August 2023) makes a commitment to
national standards National Regulations,
Guidelines and Competency Standards
including A960 which is referenced in the
Code’s GtGP.   
RAL_007
RAL_008 
https://forthpilo
ts.com/forth-
pilots-mission-
statement
RAL
Page 58

Page 59

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 32
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
GtGP 9.5.43 Pilotage Does the authority operate
an effective Pilot Fatigue
Management System?
Satisfactory – by rota design there is a Fatigue
Management System.  There are insufficient
acts of Pilotage to warrant a more active
system of Fatigue Management.  Pilotage acts
are naturally spaced and there is a
compliment of five Authorised Pilots for
Campbelltown.  When a vessel docks and sails
on the subsequent tide, the docking Pilot will
book a hotel room to rest if taking the vessel
out.  If there are several tides between
docking and sailing, the Pilot will return home
and the sailing Pilot allocated from the
compliment of Authorised Pilots. 
Anecdotal,
conversation
with J. Hague
during inbound
pilotage of MV
Runner and
observed
arrangements
for overnight
hotel.
RAL
4.15 – 4.16
GtGP 9.5
Pilot Exemption
Certificates 
Is a clear process for the
issuing of Pilotage
Exemption Certificate
(PECs)?
Satisfactory – there is a clear process for
issuing PEC set out in the Pilotage Manual   
Observation – there is no evidence that the
PEC process is published. 
Recommend – A&BC, as CHA, publishes the
PEC process.  For example, as an annex or
schedule to the Pilotage Directions.  
RAL_008
RAL_027
RAL_028
RAL  
Are the requirements
equivalent to those for an
authorised Pilot?
Satisfactory – the Pilotage Manual sets out a
knowledge and tripping requirement no
greater but equivalent to that for an
Authorised Pilot.   
RAL-008
RAL_027
RAL_028
RAL
GtGP 8.7.15 –
8.8.10
Port Passage
Plan
Is there a published
passage plan?
Satisfactory – there is limited passage
planning information on the A&BC website
for Campbeltown, there is a Pilotage passage
plan within the MPX, but this is not
promulgated to vessels until the Pilot boards. 
Observation – there is no evidence of a
published passage plan or comprehensive
guidance promulgated to PEC holders. 
Class 1 Maritime Authorised Pilots have a
comprehensive passage plan on their PPU
units. 
Recommend – A&BC, as CHA, should
publish a passage plan or passage plan
guidance on their website.  This could be
achieved through a standing notice to
mariners promulgated through the existing
notice to mariners page.
MJS_048 
https://www.arg
yll-
bute.gov.uk/roa
ds-and-
travel/marine-
services/campb
eltown-harbour
RAL
GtGP 8.10 Recreational
navigation
Are recreational users of
the harbour considered?
Satisfactory – information is published on
A&BC’s website, and also on the port entry
information shown on the Campbeltown
Harbour section of the A&BC website.   
https://www.arg
yll-
bute.gov.uk/roa
ds-and-
travel/marine-
services/Campb
eltown-harbour
MJS
Page 59

Page 60

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 33
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
4.17 – 4.20 Collecting Dues Are dues clearly defined? Satisfactory – charges (including dues) are laid
out on the Council’s website.  The process for
setting charges uses a benchmarking exercise
with other local ports.  Charges are increased
at the rate of inflation.   
https://www.arg
yll-
bute.gov.uk/fee
s/24-25/marine 
MJS
4.21-4.23 Aids to
Navigation
Are defects and
rectification of defects
recorded?
Satisfactory – as the Local Lighthouse
Authority (LLA) the following Aids to
Navigation are maintained: 
 2 fixed red lights (vertical) on the New
Quay.
 2 fixed green lights (vertical) on the Old
Quay.
 East Cardinal (located north of the Old Quay
and Marina.   
Within the harbour, there is an isolated
danger, leading lights, lateral buoyage and
NATO fuel terminal red AtoN, all of which is
maintained by the MOD.   
MJS_049 MJS
4.24 GLA returns Are returns made to the
GLA?
Satisfactory – the LATON three-year return for
A&BC identifies the availability return values
for the period April 2021 to April 2024 as: 
 Cat 2 = 99.76% (target is 99.0%)
 Cat 3 = 100% (target is 97.0%) 
Provision and maintenance of Aids to
Navigation is recognised as an area of best
practice.   
MJS_049 MJS
4.25-4.32 Wrecks,
Abandoned or
unserviceable
vessels
Does the MSMS refer to
powers for dealing with
wrecks?
Satisfactory – the MSMS, Section 10.4
addresses wrecks within the Conservancy
section and with respect to marking of wrecks. 
There is one abandoned vessel, the ‘Lady
Craig’ left in 2023.  There is no recent history
of wrecks in the harbour.    
MJS_001 
Anecdotal
MJS
Page 60

Page 61

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 34
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
GtGP
9.4.17 -9.4.21 
Pilot Launches  Do Pilot boats meet
statutory requirements and
appropriate Codes?
Satisfactory – Pilot boats are provided by
Class 1 Maritime Ltd.  There are 3 Pilot vessels
available for use in Pilot transfer, one of which
(at the time of audit) was awaiting inspection
and certification.  Evidence viewed of
workboat certification (with Pilot Boat
endorsement) provided Bluebird had her last
out of water inspection in June 2024. 
Maintenance records, schedules and reports
were all provided.  The boats are crewed
locally by A&BC harbour staff, evidence of
qualifications, drills and exercises provided. 
RAL_021
RAL_022
RAL_035
RAL_036
RAL_037
RAL_038
RAL_039
RAL_040
RAL_041
RAL_042
RAL_043
RAL_044
RAL
GtGP - 10 Towage
Operations
Does the organisation
produce towage
guidelines?
Satisfactory – A&BC, for Campbeltown
Harbour, has issued Towage Guidelines.   
Observation – the towage guidelines are not
published on the website and available for
stakeholders.  The Towage Guidelines have a
section outlining Master/Pilot/Towage
exchange considerations.   
Recommend – towage guidelines are
published for harbour users to ready and
apply.  
RAL_026 RAL  
Is there a process for
approving towage
providers? 
Are non-routine tows pre-
approved / managed by
the organisation?
Satisfactory – the Towage Guidelines state
that: “Towage companies are requested to
supply the Harbour Master at Campbeltown
with the appropriate Risk Assessments, Policies
and Procedures relevant to their operations
within Campbeltown Harbour Limits”.  This has
been evidenced as in place for Clyde Marine
Tugs operating in Campbelltown Harbour. 
Observation – there is no evidence that this
has been carried out for Svitzer Marine or
Serco tugs operating at Campbeltown
Harbour.   
Observation – there are no specific
procedures referenced in the Towage
Guidelines to manage non-routine towage.   
Recommend – the SHA upgrade the
information in the Towage Guidelines from
a request to a requirement and ensure that
all third party towage operators comply
with the procedure in place.   
Recommend – A&BC should review the
Towage Guidelines and introduce a
procedure to manage non-routine (dead
and unusual structure) towage within its
Statutory Harbours.  There is always the
possibility that a tow may occur either
within, or through the Council’s harbour
limits.  
RAL_026
RAL_045
RAL_046
RAL_047
RAL_048
RAL_049
RAL_050
RAL
Page 61

Page 62

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 35
PMSC / GtGP
Reference Subject Evidence Required 
For Compliance Evidence of Compliance Recommendations Evidence
Reference Auditor
Cont.   
GtGP - 10
Cont.   
Towage
Operations
Cont.   
Is there a process for
approving towage
providers? 
Are non-routine tows pre-
approved / managed by
the organisation?
Observation – the ‘Navigation Safety, Pilotage
and Towage Policy’ states: “Currently there is
no provision of towage services at any of the
harbours for which Argyll and Bute Council are
the Harbour Authority.”  Whilst there are no
permanently stationed tugs in Campbeltown,
ship towage does occur. 
Recommend – the ‘Navigation Safety,
Pilotage and Towage Policy’ is revised to
recognise ship towage operations in
Campbelltown.  Additionally, non-routine
towage should be included in the policy
statement.  
MJS_002 RAL
GtGP 1.9.11 Licensing
Harbour Tugs?
Does the harbour authority
have the power to licence
tugs?  
Not applicable – there are no known powers
to licence tugs.   
n/a MJS
GtGP - 10.4 Diving
Operations
(commercial)
Is there a process for
managing commercial
diving?
Satisfactory – a ‘Permission to Dive Permit’ for
30 March 2024 was evidenced.   
MJS_043 MJS
GtGP - 10.4 Diving
Operations
(recreational)
Is there a process for
managing recreational
diving?
Not applicable – there is no history of
recreational diving.   
n/a MJS
GtGP - 6.7.3 Hot Work
Permits
Is there a process for
managing Hot Works?  
Satisfactory – a ‘Marine Department Hot Work
Permit – Ship’ for 27 May 2024 was evidenced.   
MJS_045
MJS_046
MJS
GtGP – 6.7.3 Bunkering Is there a process for
managing Bunkering?  
Satisfactory – the NATO jetty operates its own
Oil Pollution Plan.  Fishing vessels bunker by
road tanker.   
n/a MJS
GtGP – 11.3,
11.4
Regulation of
Port Craft, Pilot
Launches and
Workboats
Does the Authority have a
procedure for regulating
port craft?
Satisfactory – for vessels using the harbour,
checks are made as part of the booking
process operated by LPS.   
Observation – A&BC does not have a
formalised process for checking commercially
operated Coded vessels.   
Recommend – the Harbour Authority
considers the requirements of the GtGP
(Section 11.3, 11.4) with respect to
regulating third party commercial
workboats and launches within its area of
jurisdiction and creates a registration
scheme for workboats operating within the
Authority’s area.
MJS_001 MJS  
Page 62

Page 63

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 36
B Quayside Check
Visual observation of Campbeltown Harbour quays during the site visit on the 03 September 2024.   
B.1 Quayside Check
Reference Subject Evidence Required 
For Compliance Observation Recommendations Auditor
PMSC 3.0
GtGP 8.11.19
ACOP 207-208
SIP 014
Access Is the quayside and its access
locations clear of debris and
obstructions?
Satisfactory – the Old Pier was clear of debris and
obstructions.  The New Pier had wood bark from
cargo handling that was being cleared away, with
the RoRo berth and linkspan clear and well
maintained.  Housekeeping on the quay was
evident during the visit.   
MJS
Pedestrian/Disabled access for
passengers or leisure users?
Satisfactory – walkways were clearly marked for
pedestrians to access the ferry terminal; walkways
were delineated from vehicle parking areas.   
MJS
Is the type and condition of
quayside surface appropriate
to the operation?
Satisfactory – the marina pontoons, quayside and
pier surface accessible to the public (some areas
were restricted) is appropriate to its intended use.   
MJS
ACOP 211-223
SIP 014
Rescue and
Lifesaving
equipment (LSE) at
the water’s edge
Is there appropriate means of
egress from the water?
Satisfactory – the quayside had appropriately
spaced LSE.  The quay structures had water egress
ladders.   
Observation – at the RoRo ferry terminal, one
egress ladder was missing the cope level hand-grab
bar.  See Image B1.   
Recommend – the replacement of the missing
the cope level hand-grab bar.  
MJS
Is there appropriate LSE at
quay edge?
Satisfactory – Life saving equipment (life rings)
were installed at the pier, dockside and marina
pontoons.   
MJS
SIP 005 Bollards and
securing
equipment
Does the general condition of
bollards appear to be in good
order?
Satisfactory – the bollards along the New Quay
were (visually) in good condition.  The RNLI
berthing area had been recently refitted, as had the
marina.  The Old Quay had a number of older
bollards that were in need of painting.   
Observation – the Old Quay bollards had not been
recently painted, were not numbered, or Safe
Working Loads (SWL) identified. See Image B2.     
Recommendation – bollards and bits are
inspected, numbered and SWL added.  
MJS
Page 63

Page 64

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 37
Reference Subject Evidence Required 
For Compliance Observation Recommendations Auditor
SIP 005 Fenders Is the fendering appropriate to
the vessel being handled?
Satisfactory – fendering on the New Quay
commercial quay is vertical rubber sections, the
linkspan RoRo berth has piles and sprung fenders. 
The Old Quay has a mixed set of fendering
dependant on vessel type.   
MJS
Is the condition of the
fendering in good order?
Satisfactory – fitted fendering was observed to be
in serviceable condition.     
MJS
Are chaffing plates used? Satisfactory – wood sections are used on most
sections of the Quays.  Some sections are concrete,
along the New Quay at the commercial berth.     
Observation – the wooden edge protection beams
at the RoRo berth (see Image B3 and the Old Quay
(See Image B4) have deteriorated.   
Recommend– wooden edge beams along the
Quay edges are reviewed, with repairs made or
sections replaced as required.  
MJS
ACOP 232-235
SIP 005
SIP 014
Lighting Is lighting appropriate and
appear to be in compliance
with ACOP ‘safety in docs’ and
the PFSP?  
Satisfactory – there is ample lighting around all
berths at the Quays and the Pontoons (note,
quayside checks carried out in daylight only).   
MJS
ACOP 58-60 Layout Is adequate separation
delineated between quayside
operations?
Satisfactory – there is adequate delineated between
quayside operations with certain sections fenced
off and usable to manage cruise passengers under
International Ship and Port Facility (ISPS)
requirements.   
MJS
ACOP 82 Signage Is appropriate signs and
markings provided
Satisfactory – the harbour has adequate signage.     MJS 
Page 64

Page 65

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 38 
Image B1. Campbeltown, missing water egress ladder hand-grip Image B2. Campbeltown, Old Quay bollard
Page 65

Page 66

Port Marine Safety Code - Audit: Campbeltown 2024    Argyll and Bute Council
ABPmer, October 2024, R.4589  | 39  
Image B3. Campbeltown, New Quay wooden edge beams Image B4. Campbeltown, Old Quay wooden edge beams 
Page 66

Page 67

Page 67

Page 68

This page is intentionally left blank

Page 69

Page 69

Page 70

Page 70

Page 71

Page 71

Page 72

Page 72

Page 73

Page 73

Page 74

Page 74

Page 75

Page 75

Page 76

Page 76

Page 77

Page 77

Page 78

Page 78

Page 79

Page 79

Page 80

Page 80

Page 81

Page 81

Page 82

Page 82

Page 83

Page 83

Page 84

Page 84

Page 85

Page 85

Page 86

Page 86

Page 87

Page 87

Page 88

Page 88

Page 89

Page 89

Page 90

Page 90

Page 91

Page 91

Page 92

Page 92

Page 93

Page 93

Page 94

Page 94

Page 95

Page 95

Page 96

Page 96

Page 97

Page 97

Page 98

Page 98

Page 99

Page 99

Page 100

Page 100

Page 101

Page 101

Page 102

Page 102

Page 103

Page 103

Page 104

Page 104

Page 105

Page 105

Page 106

Page 106

Page 107

Page 107

Page 108

Page 108

Page 109

Page 109

Page 110

Page 110

Page 111

Page 111

Page 112

Page 112

Page 113

Page 113

Page 114

Page 114

Page 115

Page 115

Page 116

Page 116

Page 117

Page 117

Page 118

Page 118

Page 119

Page 119

Page 120

Page 120

Page 121

Page 121

Page 122

Page 122

Page 123

Page 123

Page 124

Page 124

Page 125

Page 125

Page 126

Page 126

Page 127

Page 127

Page 128

Page 128

Page 129

Page 129

Page 130

This page is intentionally left blank

Page 131

ARGYLL AND BUTE COUNCIL  ARGYLL & BUTE HARBOUR BOARD
ROADS AND INFRASTRUCTURE SERVICES       20 MARCH 2025 
MARINE ASSET MANAGEMENT PLAN – WORKS UPDATE 
1.0 INTRODUCTION 
1.1 This report provides Harbour Board Members with a review of the marine
infrastructure works contained within the Marine Asset Management Plan
(MAMP). It includes significant and major programmes currently planned as well
as those underway. 
2.0 RECOMMENDATIONS 
2.1 Members are asked to:
2.1.1 Consider the update on the major programmes currently being addressed within
Argyll and Bute Council’s MAMP (appendix 1). 
3.0 DETAIL 
3.1 The MAMP lists the programmed work being carried out over the next few years
with more detailed estimates focused on the next 5 years. The plan is adaptable
and can change to suit emerging priorities and circumstances.
The plan contains projects located throughout the Argyll and Bute Council
area, many of which include work to adapt existing or renew infrastructure to
support the CalMac Ferry Limited (CFL) services in advance of new vessels
being delivered.
Funding for these Capital projects is mainly delivered by Prudential Borrowing,
paid back through fees and charges collected at our major ports.
Projects are competitively tendered to ensure a wide range of quotations,
delivering value for money and across a range of suppliers to ensure works are
Page 131 Agenda Item 5

Page 132

delivered to a high quality and on time. Projects are monitored and re-forecast
regularly to manage risks and adjust budgets where required and in good time.
3.2 Alongside our maintenance, servicing and conservancy works, Marine
Operations are presently engaged in several longer, and shorter-term projects
across Argyll and Bute which are listed here.
3.2.1 Craignure – New Ferry Terminal 
A separate report is presented with the detail of this project for gateway approval. 
A project forecast is shown here as image 1.
Image 1 
Costs are estimated at £3M over the next two years to reach construction stage
which includes completion of business cases, environmental impact
assessments, design and tendering. Construction estimates have risen to c.£96
million and Members should note that this is now reflected in the MAMP and is a
significant increase from the previously reported £50 million estimate. A more
accurate assessment of those costs will follow in the next phase of the project and
will be reported back. 
3.2.2 Iona breakwater – protection of ferry berthing slip
This contract has now been awarded to Foyle and Marine Dredging Ltd for
£14.8m.  Ordering and stockpiling of rock armour is now well underway with
other preparations, and the contractor is anticipated to be on site this month.
The total construction phase is estimated to take some 17 months. These works
will include the adjacent slipway repairs as well as the toilet block.
3.2.3 Fionnphort overnight berthing facility 
Preparation is progressing with Fionnphort to ensure: 
• Overnight berth 
Page 132

Page 133

• Safe access for crew 
• Sheltered berthing 
• Charging and supply facilities 
• Traffic survey to enhance the road passenger interface at the terminal area. 
An Environmental Impact Assessment (EIA) is in process including the socio-
economic assessment. Design colleagues have addressed all potential issues
with CalMac Marine regarding swept paths and approaches. When Marine
Scotland approve the EIA we will continue with the marine licences, public
engagement and other preparations with a view to tender in the coming months.
Costs are estimated at £800k over the next two-year period and thereafter an
estimated £25M for construction works. 
3.2.4 Port Askaig – Marshalling area development for new CalMac vessels
Following a review of consultation feedback from communities and the level of
facility we currently have, we can deliver a cost-effective solution that remains
within the parameters of the provision in the Marine Asset Management Plan,
without the larger scale disruption and additional cost that would have been
required by the original concept design. This considers the community’s wish
to preserve parking spaces and will deliver improved signage, lining, quayside
traffic management and CCTV in time for the new larger ferries arriving. We are
now progressing that solution to enhance existing facilities and will be
discussing operational plans with CFL and Transport Scotland.
The Council works will be completed following completion of CMAL’s quayside
works and will consist of relining, signage, parking allocation, CCTV and traffic
access control installation.
Other aspects including installation of substantial barriers in the marshalling
area will not be progressed. Previous incidents in the Marshalling area involved
practices which are no longer permitted in the Port area.
Costs are estimated at £2M for the longer-term improvement works as well as the
short term works which include the CCTV installation. 
3.2.5 Feolin
Installation of a passenger only access at Feolin, for those periods when the
vehicular vessel is not available. Although these occasions are relatively rare,
we recognised the need for a pontoon and gangway system near the existing
slipway for passengers with limited mobility. This will make a very significant
improvement to the connectivity issues when there is a breakdown on the
Eilean Dhiura.
Page 133

Page 134

Officers have been disappointed with the response to sourcing these works so
far and are including other options for a solution as well as continuing to
engage with the established pontoon providers.
Funding available is £100k from Crown Estates sources. 
3.2.6 Campbeltown Harbour
Campbeltown Harbour continues to be very busy commercially with timber
loading projected to increase at the port. 
Linkspan Overhaul:
We have commenced the cylinder overhaul programme at Campbeltown, with
all four cylinders having been uplifted and taken to workshop for refurb work
and testing, so that they can be returned to site.
This programme will ensure that no further disruption is required for this work
when the ferry service resumes.
Other business opportunities include using Campbeltown as a strategic hub for
the planned offshore wind projects which are being explored and this
represents a real opportunity, to develop the Port and secure long-term work in
and from Campbeltown harbour. 
Replacement of ‘Wall A’ at the Old Quay is well underway and due for
completion in 2025/26. Replacement of ‘Wall A’ works are estimated at £6M to
complete over the next two-year period. 
3.2.7 Rothesay Harbour
Stability works to the main berthing face were completed early and on budget.
Preparations are now underway for Phase 3 of the overall works, which will see
a strengthening of the roundhead and may include fender renewals.
Costs are expected to be £4.5M over the two-year period. 
4.0 CONCLUSION
4.1 This report provides Harbour Board Members with a review of the marine
infrastructure works Asset Management Plan. It is an update on significant and
major programmes currently planned and underway within Argyll and Bute
Council’s Marine Asset Management Plan. 
5.0 IMPLICATIONS
5.1 Policy - None directly arising from this report.
Page 134

Page 135

5.2 Financial - Increases to fees and charges are required to ensure future income
is sufficient to maintain and develop Argyll & Bute Council’s marine assets for
future years. Alternative funding routes will also be explored to support future
projects.
5.3  Legal - Considered to be none directly arising from this report.
5.4  HR -  None.
5.5  Fairer Scotland Duty:
5.5.1   Equalities - protected characteristics - None directly arising from this
report.
5.5.2   Socio-economic Duty - None directly arising from this report. 
5.5.3  Islands - Completed works and projects will enhance service reliability
and community connectivity.
5.6 Climate Change - There are no direct impacts regarding climate change from
this report, due regard will be given to climate change with a view to minimising
any climate change impact and these will be considered as and when they
arise. 
5.7 Risk - Completed works will reduce the repair and maintenance on existing
infrastructure 
Above inflation increases may have a detrimental economic impact on
businesses using the facilities for example: 
• Fishermen.
• bulk importers.
• timber exporters.
• wind farm developers.
• Cruise companies.
Significant increases may also reduce usage and customers while making
attracting new business more difficult.
External influences may come to bear on ferry usage patterns which may, in
turn, impact on income from ferry fees and charges i.e. Vessel breakdowns and
redeployments, Environmental issues (car use), Brexit and potential changes
in RET. This will pose a potential risk to income.
5.8  Customer Service - An overall improvement in travel experience and reliability
should result with improved and maintained infrastructure.
5.9 The Rights of the Child (UNCRC) - None directly arising from this report. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure Services
Page 135

Page 136

Policy Lead for Roads, Transport and Amenity: Councillor John Armour 
MARCH 2025                                                  
For further information contact:
Scott Reid, Marine Operations Manager Tel: 01546 604 696
Stephen Hall, Interim Head of Roads and Infrastructure Services Tel: 01546 604 324 
APPENDICES
Appendix 1 - Marine Asset Management Plan   
Page 136

Page 137

#
Asset Location 2024/25 Items 2025/26 Items 2026/27 Items 2027/28 Items 2028/29 Items
Bunessan £5,000 CAT 5 upgrade
Campbeltown New
Quay £60,000 Cylinder O/H £150,000 HPU & control
panel overhaul
Campbeltown Old
Quay £5,000,000 Construction
wall A £1,000,000 Construction wall
A
Craignure £1,000,000
Licencing.
Finalise design
and Tender
documentation
£2,000,000
Finalise design
and Tender
documentation
£20,000,000 Construction of
terminal £50,000,000 Construction of
terminal £26,000,000
Complete
construction of
terminal
Craignure £1,000,000 New PAS Design
& build
Cuan Ferry slip £2,000 Next steps to be
agreed £2,000,000 Future provision
Dunoon Harbour £50,000 Essential
upgrade works £300,000 Upgrade works -
to be determined
Easdale Pier £1,000 Next steps to be
agreed £2,400,000 Future provision
Ellenabeich Pier £1,000 Next steps to be
agreed £5,000,000 Future provision
Feolin Ferry slip CE funding
Installation of
passenger
access pontoon
Fionnphort £300,000
Ongoing
designs and
consultations
£500,000 Ongoing designs
and consultations £20,000,000 Ongoing
construction £5,000,000 Complete
construction
Gigha Ferry slip £200,000
Consultancy for
Design & EIA
(inc Tayinloan)
£300,000
Consultancy for
Design & EIA (inc
Tayinloan)
£500,000
Start
construction
breakwater &
aligning structure
£10,000,000 Ongoing
construction £1,000,000
Complete
construction
breakwater and
aligning structure
Iona Ferry slip £5,000,000 Construction
breakwater £10,000,000 Construction
breakwater
Kilcreggan
Oban North Pier
Port Askaig £2,000,000 New Islay vessel
enabling works
Rothesay £2,000,000 Berthing face
stab works £2,500,000 Round head
capital works
£27,005,000Year Totals £13,560,000 £19,504,000 £50,200,000 £65,000,000
1
Appendix 1 - Marine Asset Management Plan
Page 137

Page 138

This page is intentionally left blank

Page 139

ARGYLL AND BUTE COUNCIL  ARGYLL & BUTE HARBOUR BOARD
ROADS AND INFRASTRUCTURE SERVICES       20 MARCH 2025 
MARINE ASSET MANAGEMENT PLAN – CRAIGNURE FERRY TERMINAL 
1.0 INTRODUCTION 
1.1 This report provides Harbour Board Members with the latest update on the
proposed ferry terminal project at Craignure, Isle of Mull, and seeks
authorisation to proceed from the Outline Business Case (OBC) and progress to
the next phase, which includes Environmental Impact Assessment (EIA),
planning and licencing. 
1.2 Previously reported costs through the Marine Asset Management Plan are £3M
over the next two years, to reach the construction stage, which includes
completion of business cases, Environmental Impact Assessments, design and
tendering. 
1.3 The next stage will also develop more accurate construction costing estimates
as the design and methodology become more informed. The initial construction
projection cost of £50 million is now estimated at c.£96 million based on
inflationary increases to the original 2020 estimates. 
2.0 RECOMMENDATIONS 
2.1 Members are asked to:
2.1.1 Consider and discuss this update on the new ferry terminal project at Craignure
in conjunction with the Project Forecast (appendix 1).
2.1.2 Note that c.£96 million is the high-level construction projection estimate at present
based on inflationary increases to the 2020 estimates.
2.1.3 Approve the continuation of the project to the next phase of the project with the
option referred to as option ‘D1’ (image 1) as the preferred option.
Page 139 Agenda Item 6

Page 140

2.1.4 Approve the advisory and consultation structure at 3.5 and described in the terms
of reference for the Working Group (appendix 2), consisting of Working Group
and Reference Group to advise Council Officers and Elected Members. 
3.0 DETAIL 
3.1 Background to the Craignure Pier Development Project
3.1.1 Scottish Government and Transport Scotland strategic planning, as part of the
Islands Connectivity Plan requires Argyll and Bute Council to upgrade the ferry
terminal at Craignure to facilitate planned deployments of new and existing
vessels. 
The existing pier and passenger access are not fit for those plans and so new
infrastructure is required.
3.1.2 Project Scope & Objectives
The Project Scope is defined in the Employer’s Requirements document (a
working document at OBC stage), which defines the infrastructure scope and
performance and capacity requirements. 
The Project Objectives include:
• Replace the existing terminal infrastructure, parts of which are in poor
condition, deteriorating or have limited structural capacity.
• Increase berth capacity at the new ferry terminal to allow the full range of
design vessels to be safely accommodated.
• Ensure vessels can reliably berth year-round at the new ferry terminal,
including in challenging weather conditions and overnight, to reduce
weather-related cancellations and improve the winter timetable.
• Increase resilience of the new ferry terminal operations.
• Allow safe and efficient embarkation and disembarkation for both vehicles
and foot passengers, including those with impaired mobility and wheelchair
users.
• Increase capacity of the new vehicle marshalling area in line with industry
standards, addressing congestion on the A849.
• Provide a new terminal building with modern facilities, meeting staff and
passenger requirements.
• Provide access for RNLI lifeboat, which is used for medical evacuations
from Mull to mainland.
• Avoid and minimise disruption to the ferry service as far as practicable
during the construction works. 
Page 140

Page 141

3.1.3 In order to progress this project, a preferred option should be confirmed so that
detailed designs, cost estimates and construction methods can be developed.
Several different locations have been the subject of extensive discussions and
consultations since the original STAG report was presented in 2019. 
3.1.4 Over this time, a general acceptance was readily apparent that the existing pier
is in the optimal location for the ferry service. Factors such as safe water depth,
recognising residential and commercial areas and prevailing weather direction
all underline the position that the preferred option should be as close to the
existing infrastructure as possible, without intolerable disruption to the existing
ferry service.
3.1.5 A major factor in confirming the location was provided by the Ground
Investigations (GI) carried out last year. 
The GI encompassed an area covering two of the most suitable location options
closest to the existing pier, giving the best information on technical construction
issues like pile size in relation to water depth and the condition of the rock base
of the seabed. It also gave an indication on how close proximity working may
affect the ferry service and mitigations to consider during the construction
phase.
3.1.6 As service continuity during the construction phase is a major concern for all
stakeholders, specific discussions were held with the ferry service provider CFL
/CalMac and vessel Masters. The experience gained from working together
during the GI works and feedback from the Masters of the large vessels
reassured the team that no significant gain would result from a relatively small
increase in the distance of the construction from the existing pier.
3.1.7 The data and information gathered during this period has resulted in the option
that is closer to the existing pier, referred to as D1 (image 1), as the optimal site
for the new infrastructure and is recommended as the preferred option to take
forward. 
Page 141

Page 142

3.2 Preferred option 
Image 1: Preferred option ‘D1’  
3.2.1 Layouts included on the diagram above are largely for information at this point as
those items and details are picked up and refined at the next stage. The footprint
size is based on the maximum area that may be required for operations and may
see some reduction when refined. The EIA and planning are best approached
with this maximum area as a starting point because it is a simpler process to
reduce the scale rather than find during detailed design that the site requires more
space and must therefore reapply for further licences and permissions.
3.2.2 The preferred option location is based on several connected factors and has been
the subject of extensive consultation over a significant period. These discussions
also included the ferry Captains and their professional opinions for future service
needs.
3.2.3 The reasoning is based on:
• Rebuild to north of existing pier.
o The established location is the optimal site for safe water depth and to
have as much of the new infrastructure away from residential areas. 
• As far south as possible with sufficient distance away from the existing pier for
maximum service continuity during construction.
Page 142

Page 143

o Again, this keeps the building as close to the already established area
of ferry marshalling operations.
o Maximises the northern approach area for the ferry in marginal weather
conditions.
• New pier to be parallel with the existing pier.
o For optimal weather protection.
o The pier heading was confirmed by the ferry Masters as optimal.
• Re-orientate marshalling area to increase efficiency and to reduce ribbon
effect.
o Keeping the infrastructure from spreading along the coast in a thin strip
increasingly remote from the pier.
o Operational area is concentrated around the terminal building and
linkspan. 
3.3 Proposed construction programme
3.3.1 The following is also attached as a PDF in Appendix 1 for ease of reading. 
Image 2: Proposed construction programme 
Notes on programme:
• ** start date is dependent on outcome of EIA determination. If unexpected
surveys are required to confirm information which will impact procurement
& construction methodology, the start date may be postponed until the
survey data can be provided.
• a tender process is expected to be required for the task "Surveys & EIA". 
• the task "Surveys & EIA" is shown as starting in-line with "EIA scoping
opinion review" based on officers and the consulting team having
confidence in the understanding of the survey requirements once the EIA
scoping is complete, rather than waiting for a response before beginning
the works. This is beneficial particularly in relation to seasonal surveys. 
Page 143

Page 144

3.3.2 Anticipated Survey and Technical Requirements
As an indication of the work required in the next phase, the following table is a
summary of the surveys anticipated to be included in the EIA. 
Table 1: Anticipated Survey Requirements
Survey Type Method Brief Explanation
Air Quality monitoring Diffusion tube set-up for
a defined period
Nearest council diffusion tubes are in Oban
https://www.scottishairquality.scot/latest/diffusion-
sites-info/87542
Air Quality data likely needed to inform ES with
regards to impacts of traffic flows on local
environment during construction and operation,
as well as emissions from vessels.
Noise and Vibration
(above ground)
monitoring
Survey equipment in
place for 1 week plus
surveyors taking
measurements on site
Baseline noise data is needed to allow an
assessment of potential effects on sensitive
receptors, notably residential properties in the
vicinity of the ferry terminal. Representative
baseline levels are used to model potential
construction and operational noise levels at these
locations.
Guidance is to avoid summer periods as these
are typically quieter/not normal patterns – we
may recommend a survey that spans both to get
representative ‘commuter’ traffic and
representative ‘tourist’ traffic – TBC by a noise
specialist.
Traffic surveys Surveyor counts on/in
vicinity of site
To inform transport assessment of traffic flows
associated with construction and operation and
to inform air quality/noise assessments – this
data is used to derive forecast flows in the future
to support Air quality and noise assessments.
A clear understanding of current traffic
volumes/congestion will be used to develop the
design requirements of the marshalling yard
redesign.
Underwater noise
monitoring
Static hydrophone Up to date ambient underwater noise levels
during a representative period will be important to
shape the potential effects to sensitive marine
receptors, notably harbour porpoise for which the
adjacent SAC is designated for.
The site is not pristine/undisturbed due to
established ferry routes and therefore the
availability of accurate data will allow a
Page 144

Page 145

proportionate assessment of underwater noise
generation and propagation.
Bird surveys Surveys of the site over
seasonal period
Glas Eileanan SPA – common tern breeding
Cnuic Agac Cladach Mhuile – golden eagle
breeding
May be required to inform Habitats Regulations
Appraisal of the construction/operation of the
replacement ferry terminal (do not envisage
operational effects but we do need the data on
local bird activity to inform conclusions).
Consultation with Nature Scot recommended
prior to finalising the scope of these surveys.
Marine mammal
surveys
Surveys of the site over
seasonal period
To obtain accurate data on harbour porpoise and
other marine mammal presence within Craignure
Bay and study area to inform marine ecology
effects during construction and operation.
Surveys depends on the target species but
recommend spring/summer to capture most
sensitive period. This will inform any mitigation
required and/or conditions to subsequent
licences.
Consultation with Nature Scot recommended
prior to finalising the scope of these surveys.
Baseline Photography
surveys and ZTV
preparation
Landscape specialists
on site to take
photographs
To inform landscape, seascape and visual
assessments of the proposed development.
Lynn of Lorn National Scenic Area opposite side
of Sound of Mull
ZTV = zone of theoretical visibility to inform need
for assessments
Coastal Modelling Static model equipment Dependent on availability of data and calibrated
models for the area, if not available then Data
used to inform wave action and the detailed
design of the replacement terminal and
reclamation to ensure no significant effects on
wave action and ferry operations. Similarly, the
coastal processes modelling may also be used to
inform the nature of sediment plumes formed
during dredging and where these may travel to
afterwards to deposit which may inform dredge
methods. Sediment budget within the bay.
Sediment and water
sampling –
contaminants
Vibrocore and surface
water sampling to
required dredge depth
and in dredge area
Required to inform dredge licensing to ensure
that contaminants are known within the seabed
sediment and to gather information on water
quality to inform assessments.
Note that this will require its own marine licence
from MD-LOT
Page 145

Page 146

Sediment/core
sampling – marine
archaeology and
palaeoarchaeology
Vibrocore sampling (as
part of same campaign)
May be required to inform archaeological
assessments of the palaeo-landscape below
seabed level – many parts of the UK were
affected by previous ice age cycles and these
features are present on the seabed.
The need for this activity will be determined by a
suitable archaeological specialist as part of the
EIA Scoping activity
Note that this will require its own marine licence
from MD-LOT (part of the activity above – only
one licence required to cover both)
Site Walkover
(contaminated land)
Up to 2 no. surveyors To inform a contaminated land desk study
required for planning/EIA to inform terrestrial
impacts, due to the requirement to excavate the
site to redevelop.
Scope to be confirmed but considered likely to be
required.
UK Habitat survey Up to 2 no. surveyors To inform BNG requirements as part of planning
and to provide information on ecological impacts
and protected species that may be in the site
boundary.
Statutory requirement of 10% not mandatory in
Scotland but always nice to show possibility of
landscaping and site improvements for local
community – e.g. as part of new terminal
building.
Benthic Ecology
surveys
Vessel grabs and port
structure survey
Could be done as part of sediment vibrocore
campaign to inform assessment of marine
ecology and dredge impacts to any notable
species along with any invasive species present
on port structures to be aware of.
Seasonal – summer survey window (April-Sept).
Scope to be consulted with NatureScot
Revised otter surveys Up to 2 no surveyors To ensure updated survey information is
available at the time of writing the EIA (not for
scoping stage)
Can be done at any time.
Economic Impact Study External An economic impact study may be required to
inform the socioeconomics assessment – this will
look at the potential effects during construction
(on local economy and job opportunities) and
operation (on the local economy and job
opportunities/tourism).
These studies are useful to demonstrate any
forecast demand in ferry access (PAX/Frequency
Page 146

Page 147

of trips) in line with tourism, local economy and
ferry upgrades. 
3.4 Updated project construction estimate
3.4.1 Previously reported costs are estimated at £3M over the next two years, to reach
construction stage, which includes completion of business cases, Environmental
Impact Assessments, design and tendering.
3.4.2 As reported above, the high-level estimate at present is c.£96 million. This cost
has been developed by taking the total forecast construction project cost in
2020 for option D1 and updating this cost with inflation.
3.4.3 This figure has not been updated since August 2024. When the OBC is
completed an update cost forecast can be provided for further approval by
Members at the next ‘gateway stage’, which will be this time next year before
completion of the FBC.
Inflation has been taken at the mid-point of the construction stage.  This point
in time is January 2028.  The cost has been rounded to the nearest £1000.
3.4.4 The total forecast for the construction phase of the project is c£96 million.
This forecast does not include.
• OBC stage works.
• Works between OBC and construction stage.
• Other associated works out-with the construction stage.
• Costs of any land acquisition. 
3.5 Governance and consultation
The project will follow a recognised route through the approval, procurement and
consultation landscape.
3.5.1 Approval procedure
Craignure port is an Argyll and Bute Council asset, and the governance clearly
sits with Council Members.
The project is one of those being overviewed by senior officials on the Marine
Asset Management Board with approval by Members required at each key
milestone or ‘Gateway’ review. These are points where a review of all the relevant
aspects of the project thus far can be weighed, and a decision made on
proceeding with the next step of the project.
Key milestones are indicated on the project forecast and may be described as
follows:
Page 147

Page 148

• 2025 March Harbour Board. Completion of the OBC. Selection of a
preferred option and permission to proceed to FBC for more accurate cost
estimates, licencing and surveys.
• 2026 March Harbour Board. Pre-completion of the FBC but in any case,
the procurement and tender updates, cost estimates, EIA and licencing
updates.
• 2026 September Harbour Board. Pre-construction contract award.
Although Craignure port is a Council asset, responsibility for decisions around
the ferry service supported by the terminal is determined ultimately by Transport
Scotland.
For the new infrastructure to be fit for purpose as well as a sound investment
for the future, as clear an understanding as possible of the service needs is
required at an early stage and throughout the process.
Therefore, a technical ‘Working Group’ has been formed from those public
organisations with responsibility and accountability for the service, namely
Argyll and Bute Council (infrastructure), Transport Scotland (strategy), CMAL
(new vessels) and CFL / CalMac (service provider).
The Working Group is referred to as the Craignure Pier Development Working
Group (CPDWG) and have Terms of Reference, which are attached as
appendix B. The Working Group will assist officers on coordination, information
on any changes to vessel or service programmes, make recommendations as
appropriate, act as a check on requirements and provide feedback on
consultation questions and points.
It will be for officers to then advise and recommend to Members based on the
best and most up to date information.
3.5.2 Procurement strategy
The Craignure ferry terminal project is a very large-scale marine construction
project with specific logistical issues associated with island-based works and
specialised construction companies who can provide those works. Marine and
procurement officers are working closely with consultants on an appropriate
procurement strategy that will best provide for a reliable delivery of the project
with a high degree of confidence regarding cost and construction time.
3.5.3 Consultation  
Alongside the ‘Working Group’ the long established Craignure Marine
Infrastructure Liaison Group (CMILG) will continue to be the point of contact
with the Community Councils, ferry groups, residents, businesses and Local
Elected Members. It is an important platform ensuring every voice is heard and
opinion noted and is Chaired by Councillor Armour who is Policy Lead for
Roads, Transport and Amenity Services and sits on the Council’s Harbour
Board. All substantive points raised at the CMILG meetings will be addressed
Page 148

Page 149

and responded to through the Working Group thus ensuring a qualified reply is
recorded. 
4.0 CONCLUSION 
4.1 This report provides Harbour Board Members with the latest update on the
proposed ferry terminal project at Craignure, Isle of Mull, and seeks authorisation
to proceed from the Outline Business Case (OBC) and progress to the next
phase, which includes Environmental Impact Assessment (EIA), planning and
licencing. 
5.0 IMPLICATIONS
5.1 Policy - None directly arising from this report.
5.2 Financial – Estimated costs for the next phase of the project will be added to
the Marine Asset Management Plan, allowing for the financial implications and
loan planning to be smoothed over an appropriate period.
5.3  Legal - Considered to be none directly arising from this report.
5.4  HR -  None.
5.5  Fairer Scotland Duty:
5.5.1   Equalities - protected characteristics - None directly arising from this
report.
5.5.2   Socio-economic Duty - None directly arising from this report. 
5.5.3  Islands - Completed works and projects will enhance service reliability
and community connectivity.
5.6 Climate Change - There are no direct impacts regarding climate change from
this report, due regard will be given to climate change with a view to minimising
any climate change impact and these will be considered in the Environmental
Impact Assessment for the works. 
5.7 Risk -  A comprehensive Risk Register is maintained for this project. 
Costs may change over time and a realistic risk factor is included in the
estimates.
External influences may come to bear on ferry usage patterns which may, in
turn, impact on income from ferry fees and charges i.e. Vessel breakdowns and
redeployments, Environmental issues (car use), Brexit and potential changes
in RET. This will pose a potential risk to income.
Page 149

Page 150

5.8  Customer Service - An overall improvement in travel experience and reliability
should result with improved infrastructure.
5.9 The Rights of the Child (UNCRC) - None directly arising from this report. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure Services 
Policy Lead for Roads, Transport and Amenity Services: Councillor John
Armour 
February 2025                                                  
For further information contact:
Scott Reid, Marine Operations Manager Tel: 01546 604 696
Stephen Hall, Interim Head of Roads and Infrastructure Services Tel: 01546 604 324 
APPENDICES
Appendix 1 - Proposed construction programme 
Appendix 2 - Craignure Pier Development Working Group Terms of Reference   
Page 150

Page 151

2030
Septem
ber
October
Novem
ber
Decem
ber
January
February
M
arch
April
M
ay
June
July
August
Septem
ber
October
Novem
ber
Decem
ber
January
February
M
arch
April
M
ay
June
July
August
Septem
ber
October
Novem
ber
Decem
ber
January
February
M
arch
April
M
ay
June
July
August
Septem
ber
October
Novem
ber
Decem
ber
January
February
M
arch
April
M
ay
June
July
August
Septem
ber
October
Novem
ber
Decem
ber
January
February
M
arch
April
M
ay
June
July
August
Septem
ber
October
Novem
ber
Decem
ber
January
Outline Business Case (OBC)
Harbour Board (September 2024) *
OBC review
OBC review response *
Harbour Board (February 2025) *
EIA scoping
EIA scoping opinion review (MD-LOT & A&BC)
Surveys & EIA (tbc, dependent on procurement route)
EIA Review & licensing
Tender / procurement (management & design consultant for FBC &
Construction stage)
Completion of FBC
Submission of FBC *
Tender / procurement (incl ECI to EIA) **
Float - procurement stage
Contract Award *
Construction start date *
Construction
Construction (mid-point) *
Handover & commissioning
Float / Risk
Completed
Planned
Key Milestone *
Start date dependant on outcome of EIA determination
**
2028 2029
Programme Item
2024 2025 2026 2027
APPENDIX 1
Page 151

Page 152

This page is intentionally left blank

Page 153

Craignure Pier Development (CPD) Working Group
Terms of Reference
Ver: 240115 (004) FINAL
Background to the Craignure Pier Development Project
The Islands Connectivity Plan outlines transport connectivity as safe, reliable, and efficient movement of
people, goods and services to support sustainable communities and populations. As part of the ICP, local
authorities and private operators who are statutory harbour authorities and are responsible for ferry
services and infrastructure assets are encouraged to adopt the ICP Vision and Priorities. As such the
existing pier and passenger facilities at Craignure are life expired and new infrastructure will support the
deployment of new vessels on the route and wider ferry network. 
Membership & Purpose of the Craignure Pier Development Working Group
This group brings together representatives from Argyll & Bute Council, Transport Scotland, CMAL and
CalMac to input to the delivery of improved pier facilities for the Craignure-Oban route, at Craignure Pier.
Chair and Secretariat
This group will be chaired by Argyll & Bute Council Marine Operations, with secretariat provided by Turner
& Townsend (T&T).
Project Scope & Objectives
The Project Scope is defined in the Employer’s Requirements document for the project (a working
document at OBC stage), this defines the infrastructure scope, performance and capacity requirements.
The objectives of the proposed development are to:
• Replace the existing terminal infrastructure, parts of which are in poor condition, deteriorating or
have limited structural capacity.
• Increase berth capacity at the new ferry terminal to allow the full range of design vessels to be safely
accommodated.
• Ensure vessels can reliably berth year-round at the new ferry terminal, including in challenging
weather conditions and overnight, to reduce weather-related cancellations and improve the winter
timetable.
• Increase resilience of the new ferry terminal operations.
• Allow safe and efficient embarkation and disembarkation for both vehicles and foot passengers,
including those with impaired mobility and wheelchair users.
• Increase capacity of the new vehicle marshalling yard in line with industry standards, addressing
congestion on the A849.
• Provide a new terminal building with modern facilities, meeting staff and passenger demand.
• Provide access for RNLI lifeboat, which is used for medical evacuations from Mull to the mainland;
and
• Maintain the operational ferry service during construction works, avoiding and minimising disruption
to the ferry service as far as possible.
APPENDIX 2Page 153

Page 154

Craignure Pier Development (CPD) Working Group
Terms of Reference
Ver: 240115 (004) FINAL 
Project Governance
Governance Responsibilities
Argyll & Bute Council. Funding Decisions (Project Sponsor).
Programme delivery. 
Craignure Pier Development Working Group 
Membership: Argyll & Bute Council, Transport Scotland, CMAL,
CalMac, Project Development Group.
Project level direction.
Design co-ordination. 
Technical support & advice.
Project joint communications.
Project Development Group
Membership: consultancy & design team (Turner & Townsend,
Ramboll UK), Argyll & Bute Council, and consultation with other
relevant parties as required.
Production of Outline Business Case.
Design development.
Updates to Argyll & Bute Council.
Reference Group - Craignure Marine Infrastructure Liaison
Group (CMILG).
Membership: Council Officers, Elected Members, Argyll & Bute
Council, Transport Scotland, CMAL, CalMac, Local community
representatives, Project Development Group.
Details of the Reference Group Terms of Reference (TOR) are
recorded in the latest version of the “Craignure Marine
Infrastructure Liaison Group TOR” document
Local Stakeholder and community
engagement to provide perspective
to the work managed by the
Craignure Pier Development working
group. 
Craignure Pier Development Working Group Objectives
1. Provide project input for papers to the Argyll & Bute Harbour Board via the Marine Operations
Manager covering progress and programme.
2. Requests for strategic direction and project scoping guidance will also be made if required.
3. Assist the Project Development team in maintaining robust and auditable project governance.
4. To provide a forum for: project design collaboration; ferry service collaboration and facilitating
central decision making, based on the information available to the relevant parties at the time.
5. Bring together the parties who are accountable and responsible for decisions on separate work
streams affecting service provision between Craignure and Oban.
6. To ensure all parties are made aware of, or involved in, the decisions that affect each other’s work
streams.
7. To agree, manage and maintain clear communication strategy and plans.
8. To develop the strategy for stakeholder engagement through the Craignure Marine Infrastructure
Liaison Group.
9. To feed in substantive views from CMILG, via the Chair of the CMILG. 
Page 154

Page 155

Craignure Pier Development (CPD) Working Group
Terms of Reference
Ver: 240115 (004) FINAL
Meetings, Communication and Document/Information Management.
Venue and frequency: meetings will be held every 4-6 weeks via teleconference (MS Teams) where
appropriate.
Agenda, preparatory questions and actions to relevant parties and relevant documentation will be
distributed 5 working days in advance of the meeting via email.
Minutes and actions will to be recorded and distributed to the Working Group members within 10 working
days, with a view to being agreed/closed at the following meeting. 
Communications out-with the Working Group meeting are planned to be via email, or in a further meeting
setting with minutes taken.
Issuing of documents will be via email, with a document issue record completed by T&T, on behalf of
A&BC.
Minutes of this working group will be made publicly available on the Argyll & Bute Council website as soon
as practicable after responses are received from working group members. 
Page 155

Page 156

This page is intentionally left blank

Page 157

ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR BOARD
FINANCIAL SERVICES 20 MARCH 2025
STATUTORY HARBOUR BOARD ACCOUNTS  
1. INTRODUCTION 
1.1 This report advises that annual statements will now be provided for each of the
Council’s Statutory Harbour Authorities, upon completion of the Council Accounts. 
The Council’s Accounts for the year end 31 March 2024 were approved by Council
on 20 December 2024 and annual statements are now provided in appendix 1 of
this report. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Argyll and Bute Harbour Board consider the information
contained within this report and note that annual statements will be provided for
each of the Council’s Statutory Harbour Authorities on completion of the audit of
the Council Accounts.   
3.  DETAIL
3.1 Section 42 of the Harbours Act 1964 at paragraph (1) states the following: “It shall
be the duty of every statutory harbour undertaker to prepare an annual statement
of accounts relating to the harbour activities and to any associated activities carried
out by him”. 
3.2 The Council has previously included the statutory harbour income and expenditure
within the overall Council Accounts, and now, developing on best practice, an
annual statement of income and expenditure for each of the 8 Statutory Harbour
Authorities will be provided to the Harbour Board upon completion of the audit of
the Council Accounts.   
3.3 Harbour assets are set out in the Council’s Accounts which contain information in
relation to assets equivalent to a balance sheet. Further work will be undertaken to
assess whether and how information may be more clearly set out in a balance
sheet format in future. 
Pooling of Funds
3.4 It should be noted that the Council is the the harbour authority across 8 Harbours
and has a duty to maintain its marine infrastructure throughout the Argyll and Bute
Council footprint irrespective of the individual location’s ability to raise income.  The
cost of maintaining marine infrastructure is significant, especially so at remote or
island locations. 
3.5 Large scale or expensive works need to be paid for often within short timescales
with available funds and borrowing, which is paid back through fees and charges.
Page 157 Agenda Item 7

Page 158

To allow this to be done without short term spikes and to better suit budget
planning, it is sensible to pool the resources and the expenses of the marine
portfolio together. 
3.6 The Council approved the Council’s Audited Accounts on 20 December 2024. 
Appendix 1 provides an annual statement for each of the 8 Statutory Harbour
Authorities for the year ended 31 March 2024.  There is an overall surplus of
£810,634 when added together. 
3.7 The total income and expenditure for all other piers and harbours totals a deficit of
£426,879.  This together with the surplus outlined in paragraph 3.5 results in an
overall surplus for all piers and harbours for the year ended 31 March 2024 of
£383,756. 
3.8 Looking back at the accounts over the last 4 years, there is an overall deficit and
therefore the pooled surplus generated in 2023-24 will be paying back previous
years cumulative deficits.  Where the cumulative total moves into a surplus, this will
be ring-fenced at the end of the financial year for future years spending on piers
and harbours. 
Year Surplus/(Deficit)
£m
2020-21 (1.142)
2021-22 (0.295)
2022-23 0.318
2023-24 0.384
Total (last 4 years) (0.735) 
Consolidated HRO
3.9 It has been the reported intention of Argyll and Bute Council to consolidate its main
ports and harbours under one Statutory Harbour Authority Order. CMAL and
Cornwall Council are two examples of a Statutory Harbour Authority with multiple
ports and harbours consolidating some or all their harbour areas under one single
Statutory Harbour Authority order. The single legislation means that among other
important aspects, the Authority can then account across the entire undertaking as
one entity. 
3.10 The benefits are similar to the pooling of resources in that an Authority can better
cover planned and unexpected works that are invariably expensive without that
burden being borne by a single location.  Argyll and Bute Council intend to pursue
this on completion of the ongoing Oban HRO process. 
4. CONCLUSION 
4.1 An annual statement for the year ended 31 March 2024 is now provided for each of
the Council’s Statutory Harbour Authorities. Harbour assets are set out in the
Council’s annual accounts which contain information in relation to assets
equivalent to a balance sheet. 
Page 158

Page 159

5.  IMPLICATIONS 
5.1 Policy – Reporting on income and expenditure for the Statutory Harbour
Authorities.   
5.2 Financial – Information on income and expenditure is provided for each of the
Council’s Statutory Harbour Authorities. 
5.3 Legal – None. 
5.4 HR – None. 
5.5 Fairer Scotland Duty – See Below 
5.5.1 Equalities – None. 
5.5.2 Socio-Economic Duty – None. 
5.5.3 Islands Duty – None. 
5.6 Climate Change – None. 
5.7 Risk – None. 
5.8 Customer Service – Provision of further information included in the overall
Accounts of the Council.   
5.9 The Rights of the Child (UNCRC) – None. 
Kirsty Flanagan
Executive Director/Section 95 Officer
11 March 2025 
Councillor Ross Moreland, Policy Lead for Finance and Commercial Services 
Appendices 
Appendix 1 – Income and Expenditure Statement 
Page 159

Page 160

APPENDIX 1 
STATUTORY HARBOUR AUTHORITY 
INCOME AND EXPENDITURE STATEMENT
FOR THE YEAR ENDED 31 MARCH 2024 
Bruichladdich  2023-24 
£ £
Income  
Operating Income 51,341 
Other Income 0 
51,341
Expenditure  
Employee Costs 0 
Other Operating Expenditure 13,241 
Depreciation / Revaluation Adjustments 67,459 
Financing Costs 10,915 
91,615   
Surplus/(Deficit) of income over expenditure  (40,274) 
Carradale 2023-24 
£ £
Income  
Operating Income 22,330 
Other Income 100 
22,430
Expenditure  
Employee Costs 0 
Other Operating Expenditure 12,949 
Depreciation / Revaluation Adjustments 20,508 
Financing Costs 2,251 
35,708   
Surplus/(Deficit) of income over expenditure  (13,278) 
Page 160

Page 161

Campbeltown 2023-24 
£ £
Income  
Operating Income 360,043 
Other Income 2,168 
362,211
Expenditure  
Employee Costs 211,421 
Other Operating Expenditure 199,192 
Depreciation / Revaluation Adjustments 340,931 
Financing Costs 45,217 
796,761   
Surplus/(Deficit) of income over expenditure  (434,550) 
Craignure 2023-24 
£ £
Income  
Operating Income 1,906,346 
Other Income 0 
1,906,346
Expenditure  
Employee Costs 44,246 
Other Operating Expenditure 228,678 
Depreciation / Revaluation Adjustments 11,051 
Financing Costs 357,392 
641,367   
Surplus/(Deficit) of income over expenditure  1,264,979 
Dunoon 2023-24 
£ £
Income  
Operating Income 296,648 
Other Income 0 
296,648
Expenditure  
Employee Costs 421,503 
Other Operating Expenditure 160,511 
Depreciation / Revaluation Adjustments 202,413 
Financing Costs 93,840 
878,267   
Surplus/(Deficit) of income over expenditure  (581,618) 
Page 161

Page 162

Oban 2023-24 
£ £
Income  
Operating Income 448,477 
Other Income 3,106 
451,583
Expenditure  
Employee Costs 213,468 
Other Operating Expenditure 245,554 
Depreciation / Revaluation Adjustments 247,518 
Financing Costs 67,131 
773,671   
Surplus/(Deficit) of income over expenditure  (322,088) 
Port Askaig 2023-24 
£ £
Income  
Operating Income 863,684 
Other Income 0 
863,684
Expenditure  
Employee Costs 37,083 
Other Operating Expenditure 219,972 
Depreciation / Revaluation Adjustments 352,606 
Financing Costs 151,078 
760,739   
Surplus/(Deficit) of income over expenditure  102,945 
Rothesay 2023-24 
£ £
Income  
Operating Income 2,728,267 
Other Income 0 
2,728,267
Expenditure  
Employee Costs 671,444 
Other Operating Expenditure 321,051 
Depreciation / Revaluation Adjustments 388,324 
Financing Costs 512,929 
1,893,748   
Surplus/(Deficit) of income over expenditure  834,519 
Page 162

Page 163

ACCOUNTING POLICIES 
Accounting Convention
The financial statements have been prepared under the historical cost convention
and in accordance with applicable law and United Kingdom Accounting Standards. 
Income
Income represents fees and charges for use of the Council's Pier and Harbours. 
Expenditure
All expenditure is included on an accruals basis and is recognised where there is a
legal or constructive obligation to pay for expenditure. All expenditure has been
directly attributed to one of the functional categories of resources expended in the
accounts. 
Wages and Salaries
Provision is made in the accounts for wages and salaries paid by Argyll and Bute
Council for the running of the Piers and Harbours.
Page 163

Page 164

This page is intentionally left blank

Page 165

Argyll and Bute Harbour Board Work Plan 2024/25 
This is an outline plan to facilitate forward planning of reports to the Harbour Board. 
Date Report Designation  Lead Service/
Officer 
Regularity of
occurrence/
consideration 
Date of Reports
to Committee
Services
Additional Comment
20 March 2025 
Port Marine Safety Code Marine
Operations 
Bi-Annual 25 February 2025 
Marine Asset Management
Plan – Works Update 
Marine
Operations
Bi-Annual   
Marine Asset Management
Plan – Craignure Terminal 
Marine
Operations   
Statutory Harbour Board
Accounts 
Marine
Operations   
Future Reports – dates to be determined   
Community Groups &
Berthing Dues     
Review of Marine Services
Working Practices     
Page 165
Agenda Item
8

Page 166

This page is intentionally left blank