Democracy Spraffa

Appendix 1

Argyll and Bute Council · 11 September 2025
Back to Argyll and Bute Harbour Board — 11 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Classification: OFFICIAL#
Asset Location 2025/26 Items 2026/27 Items 2027/28 Items 2028/29 Items 2029/30 Items
Bunessan £5,000 CAT 5 upgrade
Campbeltown New
Quay £212,000
Cylinder / HPU
& control panel
overhaul
Campbeltown Old
Quay £3,017,000 Construction
wall A
Craignure £1,500,000
Finalise design
and Tender
documentation
£1,500,000
Finalise design
and Tender
documentation
£20,000,000 Construction of
terminal £50,000,000 Construction of
terminal £29,000,000
Complete
construction of
terminal
Craignure £250,000 Refurb of existing
structure
Cuan Ferry slip £5,000,000 Future provision
Dunoon Harbour £50,000 Essential
upgrade works £300,000 Upgrade works -
to be determined
Easdale Pier £2,400,000 Future provision
Ellenabeich Pier £5,000,000 Future provision
Feolin Ferry slip
Fionnphort £527,000 Consultancy for
Design & EIA £5,000,000
New aligning
structure:
Construction
£15,000,000 Ongoing
construction £5,000,000 Complete
construction
Gigha Ferry slip £1,000,000
Design & EIA &
Ground
Investigation(inc
Tayinloan)
£500,000
Start construction
breakwater &
aligning structure
£10,000,000 Ongoing
construction £1,000,000
Complete
construction
breakwater and
aligning
structure
Iona Ferry slip £13,700,000 Construction
breakwater
Kilcreggan
Oban North Pier
Port Askaig £1,923,000
New Islay
vessel enabling
works
Rothesay £500,000 Round head
capital works £2,000,000 Round head
capital works
£29,000,000Year Totals £22,429,000 £21,950,000 £45,000,000 £56,005,000
1