ARGYLL AND BUTE COUNCIL     ARGYLL AND BUTE HARBOUR BOARD
ROADS AND INFRASTRUCTURE SERVICES                          11 SEPTEMBER 2025 
PORTS & MARINE FACILITIES SAFETY CODE 2025 
1.0 EXECUTIVE SUMMARY  
1.1 This report aims to provide Members with a summary of the important
changes made in the Port Marine Safety Code (PMSC) update published this
year and explains the changes which the Council as a Port and Marine Facility
operator need to make to our existing Marine Safety Management System
(MSMS) to continue our compliance with the new ‘Code’.  
The PMSC is the UK standard for safe port marine operations and as Argyll &
Bute Council is a Statutory Harbour Authority (SHA) at 8 locations and marine
asset owner at a further 28 facilities, compliance with it remains a top priority for
safety and commercial reasons.
Although the Council currently complies with the older version of the Code, the
outcome of this year’s audits will determine compliance with the new version. 
1.2 Members are asked to note and consider this report.

Page 2

ARGYLL AND BUTE COUNCIL     ARGYLL AND BUTE HARBOUR BOARD
ROADS AND INFRASTRUCTURE SERVICES    11 SEPTEMBER 2025 
PORTS & MARINE FACILITIES SAFETY CODE 2025 
2.0 INTRODUCTION 
2.1 This report provides the Harbour Board Members with a summary of changes
made with the publication of the 2025 Ports & Marine Facilities Safety Code (the
‘Code”), which supersedes the 2016 Port Marine Safety Code (PMSC).
2.1.1 It is based on the ABPmer briefing note entitled ‘What has changed between the
2016 and 2025 PMSC?’, which can be read in full at Appendix 1 of this report.
2.1.2 It also explains the changes which the Council as a Port and Marine Facility
operator need to make to our existing Marine Safety Management System
(MSMS) to continue our compliance with the new ‘Code’.   
3.0 RECOMMENDATIONS 
3.1 Members of the Harbour Board are asked to:
3.1.1 Consider and note this report.   
4.0 DETAIL 
4.1 The Port Marine Safety Code (PMSC) was first published in 2000 following the
grounding of the Sea Empress and has been re-issued in the intervening years,
with a major update in 2016 to widen its scope to include all Marine Facilities
alongside Harbour Authorities under the title ‘Organisation’.
4.1.1 The Code remains the UK standard for safe port marine operations and will still
be abbreviated and referred to as the PMSC.

Page 3

4.2 The Council Ports & Marine Facilities
4.2.1 Argyll & Bute Council is a Statutory Harbour Authority (SHA) at 8 locations and
marine asset owner at a further 28 facilities. The SHA locations are: 
1. Bruichladdich Pier, by virtue of the ‘Islay Piers Order, 1904’. 
2. Carradale Harbour, by virtue of the ‘Pier and Harbour Orders Confirmation (No
3) Act, 1901’. 
3. Campbeltown Harbour, by virtue of ‘Campbeltown Harbour Acts and Orders
1846 to 2011’. In addition, the Council is also the Competent Harbour Authority in
respect of Pilotage, under the requirements of the Pilotage Act 1987, at
Campbeltown Harbour. 
4. Craignure Harbour, by virtue of the ‘Argyll County Council (Arinagour and
Craignure Piers, etc) Order 1961’. 
5. Dunoon Harbour, by virtue of ‘The Pier and Harbour Orders Confirmation Acts
1895 to 1906’. 
6. Oban North & South Pier, by virtue of the ‘Oban Pier and Harbour Orders 1862
to 1988’. 
7. Port Askaig, by virtue of the ‘Port Askaig Acts and Order 1904 to 1975’. 
8. Rothesay Harbour, by virtue of the ‘Rothesay Harbour Acts and Orders 1831
to 1937’.
4.2.2 Argyll & Bute Council achieves compliance with the PMSC by implementing,
monitoring and reviewing the Marine Safety Management System (MSMS). The
MSMS includes the Policies and procedures which seek to enhance the safety at
all our facilities and is externally audited by the Designated Person and so it is
important to ensure our documentation is reviewed to reflect the changes.
4.2.3 Audits have been carried out this year at Dunoon, Cuan North Cuan South,
Ellenabeich and Easdale. The audits were conducted by our Designated Person
to the requirements of the new code and will be reported at the next Harbour
Board.
4.2.4 Although the Council complies with the older version of the Code, the outcome of
these audits will determine compliance with the new version. If compliance is
confirmed the Duty Holder must report their organisation’s compliance with The
Code to the MCA on a three-yearly basis. The MCA will announce and publicise
when the next compliance statement is due and explain the process for
responding in a Marine Information Note.

Page 4

4.3 Changes to the 2025 Code
4.3.1 Many of the changes are small and clarify aspects of existing measures. A
complete list of the wording and text changes is included at Appendix 1 in the
ABPmer briefing document however the important changes are noted below.
4.3.2 The most obvious change is to the name of the Code itself, which has been
changed to emphasise that the Code applies to all facilities, although there is
also an emphasis on the proportionality of applying the guidelines across
differing scales of organisation and facility. A large busy port would be expected
to comply more fully with all the aspects of the Code where a small marina may
see only some of the measures as applicable.
4.3.3 The Code has been divided into 10 chapters as before, however chapter 10 now
refers to Conservancy Duty instead of specifically Aids to Navigation and covers
the duty of maintaining facilities with the expectation that all organisations
operating marine facilities should ensure that they are in good repair and fit for
purpose.
4.3.4 It is recognised in the Code that the Duty Holder position can come in different
forms depending on the scale of the organisation, but the responsibility of the
Duty Holder has been strengthened to say they must ensure compliance with
the relevant parts of the Code.
4.3.5 The respective roles of the Duty Holder and the Designated Person have been
clarified at a strategic level and illustrated in a clearer diagram.
4.3.6 The changes in chapter 3 clarify and emphasise the legal standing of the code
and that it is vital an organisation has effective powers to fulfil their duties and
responsibilities. To comply with the primary legislation, they are listed now in this
chapter of the Code and organisations are reminded to keep up to date with the
legislation applicable to their operations.
4.3.7 In chapter 4 an important change is that there is now a need to demonstrate that
an assessment has been conducted into requirements for a VTS or LPS (traffic
management systems) with reference to the extant Marine Guidance Note
(MGN) 401 (MCA, 2022). This creates a requirement for Harbour Authorities to
undertake a Formal Risk Assessment for ‘Vessel Traffic Management’ at each
port.
4.3.8 A further requirement in chapter 4 is that organisations must risk assess towage
operations and if not required routinely then assessment must be carried out for
specific operations and have emergency provision.
4.3.9 The new code introduces the requirement for organisations to develop and
maintain suitable ‘bridging documents’ with adjoining or interfacing
organisations.
4.3.10 Although the requirement for stakeholder engagement remains and that the
organisation should strive for consensus, removal of the sentence requiring

Page 5

harbours and facilities to develop a consensus, is a recognition of the Duty
Holder’s ultimate responsibility for the safe management of the facility. 
4.4 What this means for Argyll and Bute Council
4.4.1 The Council MSMS is in the process of a gap analysis review that will ensure
the document has been altered and updated to reflect the new code. When
completed the new version will be available for formal approval of Duty Holder
and subsequently by Members at the next available Harbour Board.
4.4.2 Apart from the documentation, some practical actions are underway to ensure
continued compliance with the Code.
4.4.3 Vessel Traffic Management: Formal Risk Assessments are being arranged so
that all our applicable ports can be assessed for appropriate Vessel Traffic
Management. This may well show some extra measures are desirable at some
locations and if that is the case, Members will be briefed in a follow up report.
4.4.4 Towage: The availability, management and control of towage in our port facility
areas is another measure the Council will revisit, and risk assess. There is
currently no provision of routine towage services at any of our ports and
harbours, however if subsequently required following the Risk Assessment the
process will be introduced in accordance with the Code and other guidelines.
4.4.5 Bridging Documents: The Council as a Harbour Authority is committed to
engaging with partner and neighbouring organisations to detail cooperation and
communication. The Code now requires these engagements to be formalised in
what it refers to as ‘Bridging Documents’ which identify gaps in coverage
between the organisations systems and then details how these gaps are
covered or resolved. This documentation may take the form of, as appropriate, a
Memorandum of Understanding (MoU), a Service Level Agreement (SLA) or a
formal Harbour Access Agreement (HAA). 
5.0 CONCLUSION 
5.1 This report provides the Harbour Board Members with a summary of changes
made with the publication of the 2025 Ports & Marine Facilities Safety Code (the
‘Code”), which supersedes the 2016 Port Marine Safety Code (PMSC) and
explains the changes which the Council as a Port and Marine Facility operator
need to make to our existing Marine Safety Management System for continued
compliance with the ‘Code’.

Page 6

6.0 IMPLICATIONS
6.1 Policy 
None directly arising from this report.
6.2 Financial 
None arising directly from this report
6.3  Legal 
Failure to comply with the PMSC could have legal consequences following an
accident or incident
6.4  HR 
None
6.5 Customer Service 
Compliance with the PMSC ensures the Council is providing satisfactory
provision to public and customers.
6.6 Risk 
Compliance with the PMSC minimises the risk of port operations.
6.7 Climate Change 
Due regard will be given to climate change with a view to minimising any
climate impact and these will be considered as and when they arise.
6.8  Fairer Scotland Duty 
None directly arising from this report.
6.9 Equalities - protected characteristics 
None directly arising from this report.
6.10 Consumer Duty 
None directly arising from this report.
6.11 Island Communities 
Compliance with the PMSC helps ensure safe and effective port operations,
vital to island communities.
6.12 Children’s Rights and Wellbeing 
None directly arising from this report.

Page 7

Kirsty Flanagan
Executive Director with responsibility for Development and Infrastructure
Services
Policy Lead Councillor John Armour
August 2025                                                  
For further information contact: Scott Reid, Marine Operations Manager 