Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
21 September 2022 
NOTICE OF MEETING 
A meeting of ARGYLL AND BUTE COUNCIL will be held ON A HYBRID BASIS BY
MICROSOFT TEAMS AND IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD on
THURSDAY, 29 SEPTEMBER 2022 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 7 - 16)  
Argyll and Bute Council of 30 June 2022 
4. MINUTES OF COMMITTEES 
(a) Policy and Resources Committee of 11 August 2022 (Pages 17 - 22)  
(b) Special Policy and Resources Committee of 11 August 2022 
(Pages 23 - 24)  
(c) Community Services Committee of 25 August 2022 (Pages 25 - 38)  
(d) Environment, Development and Infrastructure Committee of 1 September
2022 (Pages 39 - 42) 
The above minutes are submitted to the Council for approval of any recommendations on the items which
the Committee does not have delegated powers. These items are marked with an *. 
5. LEADER'S REPORT (Pages 43 - 54)  
Report by Leader of the Council 
6. POLICY LEADS REPORT (Pages 55 - 90)  
Report by Policy Leads 
Public Document Pack

Page 2

7. POLITICAL MANAGEMENT ARRANGEMENTS (Pages 91 - 94)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
8. COUNCIL CONSTITUTION REVIEW (Pages 95 - 110)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
9. FREEDOM OF ARGYLL AND BUTE (Pages 111 - 116)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
10. UKRANIAN REFUGEE RESETTLEMENT IN ARGYLL AND BUTE 
(Pages 117 - 124)  
Report by Executive Director with responsibility for Refugee Resettlement 
11. PILOT FOR REGISTRARS CONDUCTING FUNERAL SERVICES IN KINTYRE
AREA 2022 - FEES AND CHARGES (Pages 125 - 130)  
Report by Executive Director with responsibility for Customer Support Services 
12. COST OF LIVING AND FUEL COST CRISIS BRIEFING (Pages 131 - 134)  
Report by Executive Director with responsibility for Customer Support Services 
13. ARGYLL AND BUTE COUNCIL'S SHORT TERM LET LICENSING SCHEME
(Pages 135 - 216)  
Report by Executive Director with responsibility for Development and Economic
Growth and extract from Minute of meeting of Planning, Protective Services and
Licensing Committee held on 28 September 2022 (to follow) 
14. STRATEGIC HOUSING INVESTMENT PLAN (SHIP) 2023/24 - 2027/28 
(Pages 217 - 274)  
Report by Executive Director with responsibility for Development and Economic
Growth 
15. HOUSING ANNUAL ASSURANCE STATEMENT 2022 (Pages 275 - 282)  
Report by Executive Director with responsibility for Development and Economic
Growth 
16. HELENSBURGH WATERFRONT DEVELOPMENT - CAR PARKING 
(Pages 283 - 290)  
Report by Executive Director with responsibility for Roads and Infrastructure 
17. CHILD POVERTY PLAN ANNUAL REVIEW 2021-22 (Pages 291 - 374)  
Report by Chief Officer, HSCP 
REPORTS FOR NOTING 
18. EXECUTIVE ACTIONS - NATIONAL POWERBOAT CHAMPIONSHIPS, DUNOON
(Pages 375 - 378)  
Report by Executive Director for Development and Infrastructure 
NOTICE OF MOTION FOR DECISION 
19. NOTICE OF MOTION UNDER STANDING ORDER 13 
Over the past four - at least - Council terms, there is one issue which results
consistently in unanimity across the Council Chamber.

Page 3

That issue is the need for urgent action at the A83 Rest and Be Thankful, Argyll and
Bute’s lifeline in every single aspect of life in this region. 
Over the past decade and more, this Council has, in recognition of the absolutely vital
importance of the situation, called for action and engaged with government at all
levels to press the urgent and utterly vital need for a permanent solution to be
identified and, crucially, put in place, as quickly as possible. 
In each new Council term, that approach has been reiterated and backed up by
action of various forms, including numerous motions to Council and Committee,
extensive ministerial correspondence from Council Leaders and colleagues, including
joint cross-party approaches, and countless discussions at both political and official
level. 
It is also worthy of recall that our colleagues in the Argyll First group submitted a
10,000-signature petition to the Scottish Government’s Public Petitions Committee - a
petition which, in 2012, was unanimously supported by that Committee and,
subsequently, endorsed by the Council in that term. That petition is, of course, still
very much alive and is due to be considered again by that Committee in the near
future. Also worthy of note is the petition signed by over 400 Argyll and Bute
businesses - more evidence of the urgency and the impact of this situation on the
local economy. 
All of this has resulted in progress - including the trunking of the A83 between
Kennacraig and Campbeltown. The key action though remains; and we remain united
in our call, as a new Council, for urgent action. 
I ask colleagues today, in this new Council term, to join together once again and
reaffirm this Council’s position once more. Let this be the Council term where we see
a very significant leap forward towards the permanent solution that our communities
desperately need to see in use; where we see ground broken on the ‘new Rest and
Be Thankful’. 
Argyll and Bute Council: 
 Welcomes the progress made towards that goal with the Scottish
Government’s announcement of its £25m investment in design and
development work for the route through Glen Croe; 
 Reaffirms and reiterates our previous calls for planning, construction and
opening of the replacement route within the life of the this Scottish Parliament,
as a strategic priority for Argyll and Bute;
 Resolves to continue our engagement with national government at all possible
opportunities to press home the case for urgent action without delay, including
through participation in the A83 Taskforce alongside continued dialogue with
ministers; noting the Leader’s update on his most recent engagement with the
Transport Minister and that this will continue as often as required; and the
Council’s recent presentation from the RABT Campaign Group. 
Proposed by: Cllr Robin Currie, Leader of the Council 
Seconded by:  Cllr Jim Lynch, Leader of the SNP Group

Page 4

REPORTS WITH EXEMPT APPENDICES 
20. LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) - POTENTIAL BID FOR
NEW MULL CAMPUS 
(a) Report by Executive Director with responsibility for Commercial Services
and Education (Pages 379 - 386)  
(b) Appendix A (Pages 387 - 388)
E1  (c) Appendix B (Pages 389 - 392)  
(d) Appendix C (Pages 393 - 396)
E1  (e) Appendix D (Pages 397 - 406) 
21. BID4OBAN - APPROVAL OF BALLOT SUBMISSION AND BUSINESS
PROPOSAL - THIRD BALLOT 
(a) Report by Executive Director with responsibility for Development and
Economic Growth (Pages 407 - 412)
E2  (b) Appendix 1 (Pages 413 - 414)  
(c) Appendices 2 to 8 (Pages 415 - 468)
E2  (d) Appendix 9 (Pages 469 - 470)  
(e) Appendix 10 (Pages 471 - 504) 
EXEMPT REPORT FOR DECISION
E3 22. PROPOSED ACQUISITION OF KINTYRE CARE CENTRE, CAMPBELTOWN
(Pages 505 - 520)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
The Council will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:- 
E1    Paragraph 8  The amount of any expenditure proposed to be incurred by the authority
under any particular contract for the acquisition of property or the supply of goods or
services.
Paragraph 9  Any terms proposed or to be proposed by or to the authority in the course of
negotiations for a contract for the acquisition or disposal of property or the supply of goods
or services.
E2 Paragraph 6  Information relating to the financial or business affairs of any particular
person (other than the authority).
E3 Paragraph 6  Information relating to the financial or business affairs of any particular
person (other than the authority).
Paragraph 9  Any terms proposed or to be proposed by or to the authority in the course of
negotiations for a contract for the acquisition or disposal of property or the supply of goods
or services.

Page 5

Argyll and Bute Council 
Contact: Hazel MacInnes  Tel: 01546 604269

Page 6

This page is intentionally left blank

Page 7

MINUTES of MEETING of ARGYLL AND BUTE COUNCIL held BY MS TEAMS 
on THURSDAY, 30 JUNE 2022 
Present: Councillor Maurice Corry (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Robin Currie
Councillor Audrey Forrest
Councillor Graham Hardie
Councillor Kieron Green
Councillor Donald Kelly
Councillor Liz McCabe
Councillor Julie McKenzie
Councillor Yvonne McNeilly
Councillor Gary Mulvaney
Councillor Gemma Penfold
Councillor Douglas Philand
Councillor Andrew Vennard
Councillor Luna Martin
Councillor Ian MacQuire 
Councillor Tommy MacPherson
Councillor Jan Brown
Councillor William Sinclair
Councillor Garret Corner
Councillor Reeni Kennedy-Boyle
Councillor Paul Donald Kennedy
Councillor Ross Moreland
Councillor Andrew Kain
Councillor Mark Irvine
Councillor Peter Wallace
Councillor Amanda Hampsey
Councillor Willie Hume
Councillor Math Campbell-Sturgess
Councillor Dougie McFadzean
Councillor Daniel Hampsey
Councillor Fiona Howard 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
David Logan, Head of Legal and Regulatory Support
Anne Blue, Head of Financial Services
Fiona Davies, Chief Officer, Health and Social Care Partnership
Fergus Murray, Head of Development and Economic Growth
Jane Fowler, Head of Customer and Support Services
Patricia O’Neill, Governance Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were intimated from Councillors Lynch and Paterson. 
2. DECLARATIONS OF INTEREST 
Councillor Paul Donald Kennedy declared a non financial interest in Item 13 of the Agenda
(Civic Government (S) Act, Delegation for Suspension of Licence) as he held a taxi drivers
licence. He advised that he would remain in the meeting but would take no part in the
discussion of the item. 
3. MINUTES 
(a) Minute of Argyll and Bute Council 28 April 2022 
The Minutes of the meeting of Argyll and Bute Council held on 28 April 2022 were
approved as a correct record. 
(b) Minute of Argyll and Bute Council 19 May 2022 
The Minutes of the Meeting of Argyll and Bute Council held on 19 May 2022 were
Page 7 Agenda Item 3

Page 8

approved as a correct record. 
4. MINUTES OF COMMITTEES 
(a) Environment, Development and Infrastructure Committee of 2 June 2022 
The Minutes of the Environment, Development and Infrastructure Committee held
on 2 June 2022 were noted. 
(b) Policy and Resources Committee of 16 June 2022 
The Minutes of the Policy and Resources Committee held on 16 June 2022 were
noted. 
5. LEADER'S REPORT 
The Council considered a report outlining the Council Leader’s activity from 19 May to 17
June 2022. The report also included updates in relation of his Policy Lead portfolio. 
Decision 
The Council noted – 
1. The content of the report. 
2. That any reports, briefings or copy correspondence referred to in the report could be
requested as appropriate through the Leader Support Manager, noting that some
confidential reports provided by external organisations, such as COSLA, may be restricted 
(Ref: Report by Leader of the Council dated 20 June 2022, submitted) 
6. YEAR END REPORTS PACK 2021-22 
(a) COVERING REPORT AND UNAUDITED ANNUAL ACCOUNTS 
The Council considered a report which gave an overview of the Unaudited Annual
Accounts for 2021-22 and a summary of the significant movements from 2020-21
and sought approval for the unaudited annual accounts for 2021-22 for issue. 
Decision 
The Council approved the unaudited annual accounts for the year ended 31 March
2022 for issue. 
(Ref: Report by Section 95 Officer dated 21 June 2022, submitted) 
(b) REVENUE BUDGET MONITORING - FOR THE YEAR 2021-22 
The Council considered a report which summarised the revenue budget position of
the Council at the end of the financial year for 2021-22 which also summarised the
movement in the General Reserve balance. 
Decision 
The Council –
Page 8

Page 9

1. Noted the revenue budget monitoring position as at the end of financial year 2021-
22. 
2. Noted that the unallocated balance within the General Fund as at 31 March 2022,
after taking into account the contingency, amounts to £1.841m. 
3. Approved the revenue virements over £0.200m between January and March 2022. 
(Ref: Report by Section 95 Officer dated 6 June 2022, submitted) 
(c) EARMARKED RESERVES - 2021-22 YEAR-END 
The Council considered a report which provided information on the progress with
balances already earmarked within the General Fund, new balances earmarked at
the end of 2020-21 that qualify for automatic carry forward, The report also
presented proposals to earmark 16 new areas of unspent budget which require
approval. 
Decision 
The Council – 
1. Approved the revised Policy on Year End Flexibility included at Appendix 1. 
2. Approved the 16 new unspent budget earmarked reserve proposals totalling
£1.307m as supported by submitted business cases and noted that there are a
further 7 unspent budget earmarkings amounting to £4.499m that have been
previously approved, as outlined in Appendices 2.1 and 2.2. 
3. Noted the new balances of £16.474m at the end of 2021-22 that qualify for
automatic carry-forward as outlined in Appendix 3. 
4. Noted the previously approved unspent budget earmarked reserves of
£10.450m and the justification for continuing to earmark these as outlined in
Appendix 4. 
5. Noted that a total of £56.704m of automatically carried forward balances
which are previously earmarked balances in addition to the new amounts
earmarked as a result of budget decisions in February 2021 and February
2022 as outlined in Appendix 5. 
6. Approved an amendment to the funding behind the agreed £2.653m
allocation to Roads Reconstruction. A revised amount of £0.887m coming
from unallocated COVID funding and the balance of £1.766m coming from
the unallocated general fund balance. 
7. Noted that £0.515m of no longer required earmarked balances will be
released back into the General Fund. 
8. Noted that £2.148m relating to Social Work reserves is recognised on the
Balance Sheet and is outwith the scope of the report. 
(Ref: Report by Section 95 Officer dated 6 June 2022, submitted)
Page 9

Page 10

(d) CAPITAL BUDGET MONITORING REPORT - 31 MARCH 2022 
The Council considered a report which highlighted the contents of the financial
summary in relation to the Capital Budget as at 31 March 2022. The report
provided information on the financial position in respect of the Capital Plan and
also the performance in terms of delivery of capital plan projects. 
Decision 
The Council – 
1. Noted the contents of the report and the financial summaries as detailed at
Appendix 6. 
2. Approved the proposed virements at Appendix 3 and the roll forward of any over or
underspends in relation to expenditure and income as part of the year end process. 
(Ref: Report by Section 95 Officer dated 6 June 2022, submitted) 
(e) ANNUAL TREASURY REPORT 2021-22 
The Council considered the Annual Treasury Management report for 2020-21. 
Decision 
The Council noted and approved the Annual Treasury Management Report for
2021-22 and commended the Treasury Team on all their hard work on the returns. 
(Ref: Report by Section 95 Officer dated 6 June 2022, submitted) 
(f) STRATEGIC HOUSING FUND ANNUAL REPORT 2021-22 
The Council considered a report which provided an annual update on the Strategic
Housing Fund (SHF) income and expenditure position for 2021-22. 
Decision 
The Council noted the report on income and expenditure for 2021-22 and the
balance on the SHF as at 31 March 2022 and noted the estimate future income for
SHF for 2022-23. 
(Ref: Report by Section 95 Officer dated 6 June 2022, submitted) 
7. STRATEGIC HOUSING FUND APPLICATION - ISLE OF ULVA 
The Council considered a report which updated members on progress in relation to the
refurbishment of 6 properties on the island of Ulva by the North West Mull Community
Woodland Company and requested an additional Strategic Housing Fund payment to
enable the delivery of the 6 affordable houses on the island of Ulva. 
Decision 
Page 10

Page 11

The Council approved the sum of £90,663 from the Strategic Housing Fund. This is in
addition to the £12,000 per unit £72,000 in total, Officer mandate already approved from
the SHF for this project. 
(Ref: Report by Executive Director with responsibility for Development and Economic
Growth dated 30 June 2022, submitted) 
8. UK SHARED PROSPERITY FUND - ARGYLL AND BUTE INVESTMENT PLAN 
The Council considered a report which sought approval on the proposed process to be
taken by the Council for the development and preparation of the required Argyll and Bute
UK Shared Prosperity Fund (UKSPF) Investment Plan, further to the publication of the full
prospectus on 13 April 2022. 
Decision 
The Council – 
1. Agreed UKSPF Investment Plan should be pursued and to delegate final approval to the
Policy and Resources Committee on 11 August 2022. 
2. Agreed that senior officers seek the required endorsement from the local MP and MSPs to
support the Argyll and Bute UKSPF Investment Plan. 
(Ref: Report by Executive Director with responsibility for Development and Economic
Growth dated 20 June 2022, submitted) 
9. BID4OBAN - APPROVAL OF BALLOT SUBMISSION AND BUSINESS PLAN -
THIRD BALLOT 
The Council considered a report which asked members to endorse the Oban Business
Improvement District (BID) ballot submission and to note the Draft Business Proposal
Term Three, in support of the ballot. 
Decision 
The Council – 
1. Noted the ballot request and the BID4Oban Draft Business Proposal, Term Three. 
2. Agreed to delegate approval of the ballot request and final proposal to preserve the veto
date of 28th July 2022, to the Executive Director with responsibility for Development and
Economic Growth, in consultation with the Leader, Depute Leader and Leader of the
largest Opposition Group. 
3. Agreed to instruct the Returning Officer to conduct a ballot over 42 days in 2022 from
Thursday 25 August to Thursday 6 October (‘the ballot day’). 
4. Authorised the Executive Director with the responsibility for Development and Economic
Growth to cast the votes on behalf of the council in favour of the BID. 
5. Agreed that the Council will charge £7,956 (incl VAT) per annum, to BID4Oban for
administering the levy charge to businesses in Oban, with charges thereafter increased
annually. The first increase will apply on 31 October 2023 and annually thereafter for the
subsequent term of the BID. 
Page 11

Page 12

6. Agreed that, if BID4Oban are successful in the ballot, the Council will pay an estimated
£6,120 per annum in levy contributions for Council properties in Oban. 
7. Noted that if the BID group are successful in the ballot, two representatives from the
Council would be requested to sit on the BID4Oban Board, one Elected Member and one
Officer. 
(Ref: Report by Executive Director with responsibility for Development and Economic Growth
dated May 2022, submitted) 
10. LEVELLING UP FUND - BUSINESS CASE AND BID SUBMISSION UPDATE 
The Council considered a report which informed members on the final position and key
principles concerning the Levelling Up Business Cases for both of the Council’s levelling
up bids. 
Decision 
The Council – 
1. Agreed the individual elements of the bids being submitted. 
2. Approved in principle the identified match funding for each bid. 
3. Agreed that final approval of the business case and submission of the Council’s LUF
application be delegated to the two Executive Directors in consultation with the Leader and
Depute Leader of the Council and the Leader of the largest Opposition Group by the
deadline of 6 July 2022. 
(Ref: Report by the Executive Director with responsibility for Development and Economic
Growth dated 24 June 2022, submitted) 
11. ARGYLL AND BUTE COUNCIL GAELIC LANGUAGE PLAN 
The Council considered a report which advised members of an issue that had arisen in
relation to the Council’s Gaelic Language Plan. Bòrd na Gaidhlig have proposed two
amendments to the plan that are considered to be material and requires a Council
decision to proceed. 
Motion 
The Council – 
1. Notes the current status of the Council’s Gaelic Language Plan. 
2. Notes that the majority of actions in the plan continue to be delivered. 
3. Agrees the amended Target recommended by Bòrd na Gaidhlig: Up to 90% of all
primary schools in the Council area will offer Gaelic at L2 or L3. 
4. In respect of the proposed amendment to the Plan by Bòrd na Gaidhlig to establish a
Gaelic School, agrees no further change to the Council’s draft Plan as previously
approved by the Community Services Committee.
Moved by Councillor Currie, seconded by Councillor Mulvaney
Page 12

Page 13

Amendment 
We wish to take the opportunity to acknowledge the excellent work undertaken to promote
the provision of the Gaelic language throughout our diverse council area. We confirm our
agreement to recommendations 3.1, 3.2 and 3.3, and propose the following amendment to
recommendation 3.4 
3.4 In respect of the proposed amendment to the plan by Bòrd na Gaidhlig to establish a
Gaelic School requests that officers provide a comprehensive report to the next meeting of
the full Council outlining the detail behind the Bòrd’s rationale for requesting this
amendment.
Moved by Councillor McKenzie, seconded by Councillor Blair. 
As the meeting was being held on a virtual basis the vote required to be taken by calling
the Roll and Members voted as follows – 
Motion  Amendment No Vote
Cllr Corner Cllr Armour Cllr Kelly
Cllr Corry Cllr Blair 
Cllr Currie Cllr Brown 
Cllr Green Cllr Campbell-Sturgess 
Cllr A Hampsey Cllr Forrest 
Cllr D Hampsey Cllr Howard 
Cllr Hardie Cllr Hume 
Cllr Kain Cllr Irvine 
Cllr Kennedy Cllr Kennedy-Boyle 
Cllr MacPherson Cllr Martin 
Cllr McCabe Cllr MacQuire 
Cllr McNeilly Cllr McFadzean 
Cllr Moreland Cllr McKenzie 
Cllr Mulvaney Cllr Philand 
Cllr Penfold  
Cllr Sinclair  
Cllr Vennard  
Cllr Wallace   
Decision 
The Motion was carried by 18 votes to 14 with 1 no vote and the Council resolved
accordingly. 
(Ref: Report by Executive Director with responsibility for Customer and Support Services
dated 21 June 2022, submitted) 
12. POLITICAL MANAGEMENT ARRANGEMENTS 
The Council considered a report which highlighted a number of additional requests for
appointments to outside bodies that have been submitted to the Council for consideration
and further provided an update in relation to appointments to the Live Argyll Board.
Page 13

Page 14

Motion 
The Council makes the following appointments – 
1. Councillor Ross Moreland as the representative on KIMO (Kommuners International
Kiljorganisation). 
2. Councillor Gary Mulvaney as the substantive member and Councillor William Sinclair as
the substitute member to the Scottish Joint Council for Local Government Employees. 
3. Councillor Liz McCabe as the representative to Older People’s Champion. 
4. Note the details of the representation on the Live Argyll Board. 
Moved by Councillor Currie, seconded by Councillor Mulvaney. 
Amendment 
The Council makes the following appointments – 
1. Councillor Luna Martin as the representative on KIMO (Kommuners International
Kiljorganisation). 
2. Councillor Gary Mulvaney as the substantive member and Councillor William Sinclair as
the substitute member to the Scottish Joint Council for Local Government Employees. 
3. Councillor Liz McCabe as the representative to Older People’s Champion. 
4. Note the details of the representation on the Live Argyll Board. 
Moved by Councillor Irvine, seconded by Councillor Armour. 
As the meeting was being held on a virtual basis the vote required to be taken by calling
the Roll and Members voted as follows – 
Motion  Amendment
Cllr Corner Cllr Armour                 
Cllr Corry Cllr Blair
Cllr Currie Cllr Brown
Cllr Green Cllr Campbell-Sturgess
Cllr A Hampsey Cllr Forrest
Cllr D Hampsey Cllr Howard
Cllr Hardie Cllr Hume
Cllr Kain Cllr Irvine
Cllr Kennedy Cllr Kelly
Cllr MacPherson Cllr Kennedy-Boyle
Cllr McCabe Cllr Martin
Cllr McNeilly Cllr MacQuire
Cllr Moreland Cllr McFadzean
Cllr Mulvaney Cllr McKenzie
Cllr Penfold Cllr Philand
Page 14

Page 15

Cllr Sinclair 
Cllr Vennard 
Cllr Wallace 
Decision 
The Motion was carried by 18 votes to 15 and the Council resolved accordingly. 
(Ref: Report by Executive Director with responsibility for Legal and Regulatory Support
dated 15 June 2022, submitted) 
13. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI DRIVER/PRIVATE HIRE
CAR DRIVER MEDICALS AND DELEGATION FOR SUSPENSION OF LICENCE 
The Council considered a recommendation from the Planning, Protective Services and
Licensing Committee of 23 March 2022 which sought a delegation to the Executive
Director with responsibility for Legal and Regulatory Support to consider the immediate
suspension of a licence. 
Decision 
The Council agreed that a delegation be given to the Executive Director with responsibility for
Legal and Regulatory Support in consultation with the Chair and Vice Chair of the PPSL
Committee, to immediately suspend a licence in terms of paragraph 12(1) of Schedule 1 of the
Civic Government (Scotland) Act 1982 if they determine that the circumstances of the case justify
immediate suspension, on the grounds of undue public nuisance or a threat to public order or
public safety. 
(Ref: Recommendation by the PPSL Committee and report to that Committee, submitted) 
14. NOTICE OF MOTION UNDER STANDING ORDER 13 
The following Notice of Motion Under Standing Order 13 was before the Council for
consideration – 
Motion 
That, in this month where we mark our Armed Forces contribution,  this Council: 
I. renews its commitment to the Armed Forces Covenant, which is based on the premise
that those who serve or have served, and their families deserve respect, support and fair
treatment. In particular, it states that: “Those who serve in the Armed Forces, whether
regular or Reserve, those who have served in the past, and their families, should face no
disadvantage compared to other citizens in the provision of public and commercial
services. Special consideration is appropriate in some cases, especially for those who
have given most such as the injured and the bereaved.” 
II. is proud to be Armed Forces friendly and recognises the enormous contribution and
sacrifices that members of the Armed Forces and their families make every day for the
safety and security of our country.
Page 15

Page 16

III. values the service of all British Armed Forces personnel, past and present, including
those from Commonwealth Nations.  
IV. Requests officers update members on what current support we offer our armed forces
and veterans and what more can be done to strengthen partnerships with the Armed
Forces Community.  
V. Asks that our Armed Forces and Veterans Champion, Provost Maurice Corry regularly
updates members on the good work that the council is doing in this area. 
Moved by Councillor MacPherson, seconded by Councillor Kain. 
Decision 
The Council endorsed the terms of the Motion. 
Page 16

Page 17

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held in the ON A HYBRID
BASIS BY ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR
REMOTELY BY MICROSOFT TEAMS 
on THURSDAY, 11 AUGUST 2022 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle 
Councillor Jim Lynch
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Douglas Philand 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Shona Barton, Committee Manager
Anne Blue, Interim Head of Financial Services
Jane Fowler, Head of Customer Support Services
Seona Laird, HR Service Centre Team Leader
Fergus Murray, Head of Development and Economic Growth
Ross McLaughlin, Head of Commercial Services 
Prior to the commencement of Business the Chair expressed his sadness at the sudden
passing of Councillor John McAlpine and made the following tribute to him – 
Today is the first formal committee meeting since we heard of the sudden and tragic
passing of our colleague and indeed our friend, John McAlpine. 
Our thoughts are first and foremost with his wife Karen and son Sam, and his wider family
and many friends who are mourning such a sad loss. 
John would have been sitting with us today as a member of this committee. Instead we
find ourselves paying tribute to him, remembering him, and regretting a life cut short far
too soon. 
We will remember John as one of the local members for Kintyre and the Islands, and for
his passion for his home of Tarbert, as a fine sportsman, as a lively character with a ready
smile and a twinkle in his eye. An Argyll man through and through. We will miss him very
much. Let us pause for a moment to remember John. 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
Councillor Reeni Kennedy-Boyle advised that she had a relevant connection in relation to
item 8 of the Agenda (UK Shared Prosperity Fund – Argyll and Bute Investment Plan) by
Page 17 Agenda Item 4a

Page 18

virtue of her position as General Manager of Fyne Futures.  She advised that she would
leave the meeting during consideration of this item of business. 
3. MINUTES 
The Minutes of the meeting of the Policy and Resources Committee held on 16 June 2022
were approved as a correct record. 
4. FINANCIAL REPORTS MONITORING PACK - 30 JUNE 2022 
The Committee gave consideration to a report providing a summary of the financial
monitoring reports as at the end of June 2022.  There were five detailed reports, setting
out the position as at 30 June 2022. 
Decision 
The Policy and Resources Committee – 
1. Noted the revenue budget monitoring report as at 30 June 2022; 
2. Noted the financial risks for 2022-23; 
3. Noted the capital plan monitoring report as at 30 June 2022 and approved the
proposed changes to the capital plan as outlined in Appendix 4 of that report; 
4. Noted the treasury monitoring report as at 30 June 2022; 
5. Noted the reserves and balances report as at 30 June 2022; and 
6. Noted there were no revenue virements over £0.200m between April and June 2022. 
(Reference:  Report by Section 95 Officer dated 8 July 2022, submitted) 
5. BUDGET OUTLOOK 2023-24 TO 2027-28 
The Committee gave consideration to a report providing an update to the budget outlook
2023-24 to 2027-28 reported to the Policy and Resources Committee on 16 June 2022. 
Decision 
The Policy and Resources Committee noted the current estimated budget outlook position
for the period 2023-24 to 2027-28. 
(Reference:  Report by Section 95 Officer dated 20 July 2022, submitted) 
6. SERVICE ANNUAL PERFORMANCE REVIEWS 21/22 
The Committee gave consideration to a report presenting the Service Annual Performance
Review and Scorecard 2021/22 for Financial Services; Community Planning and
Development; Legal and Regulatory Support; Commercial Services; and Customer
Support Services. 
Decision
Page 18

Page 19

The Policy and Resources Committee approved the Service Annual Performance Reviews
and Scorecards 2021/22 as presented for publication on the Council’s website. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services dated 13 July 2022, submitted) 
7. AMENDMENT TO PENSIONS DISCRETIONS POLICY - SHARED COST AVCS 
The Committee gave consideration to a report proposing the inclusion of a new discretion
in the Council’s Local Government Pension Scheme (LGPS) Discretionary Pension Policy
Statement to permit Local Government Pension Scheme members to participate in a
Shared Cost Additional Voluntary Contributions (AVC) Scheme. 
Decision 
The Policy and Resources Committee approved the amendment to the Council’s Pensions
Discretion Policy to allow employees to access this financial benefit if they so choose. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services dated 19 July 2022, submitted) 
Councillor Reeni Kennedy Boyle, having declared an interest in the following item of
business, left the meeting and took no part in the consideration of this item. 
8. UK SHARED PROSPERITY FUND - ARGYLL AND BUTE INVESTMENT PLAN 
The Committee gave consideration to a report which sought approval of the Argyll and
Bute UK Shared Prosperity Fund (UKSPF) Investment Plan to deliver the Council’s
allocation of just under £4.5M to be delivered over 3 years. 
Decision 
The Policy and Resources Committee – 
1. Agreed the Argyll and Bute UK Shared Prosperity Fund (UKSPF) Investment Plan
appended to the submitted report at Appendix A for submission to the UK Government,
subject to addressing amendments/ comments from committee members; and  
2. Agreed that regular updates be provided to the Policy and Resources Committee on
the progress of the delivery of the Argyll and Bute UKSPF Investment Plan aligned to
the predefined outputs and outcomes. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 11 August 2022, submitted) 
Councillor Reeni Kennedy Boyle re-joined the meeting. 
9. PLACE BASED INVESTMENT AND CROWN ESTATE FUND 2022/23 –
REMAINING FUNDING ALLOCATIONS AND POSSIBLE PROJECTS 
The Committee gave consideration to a report which detailed the process for allocation of
the remaining Place Based Investment Funding for 2022/23 of £322,486, taking into
Page 19

Page 20

account the Place Based Investment Criteria as set out by the Scottish Government and
the associated timeline for spend.  The report also sought consideration of the unallocated
Crown Estate funding for 2022/23. 
Decision 
The Policy and Resources Committee agreed – 
1. That the Executive Director with responsibility for Development and Economic Growth
seeks suggestions for potential projects that would fit with the funds criteria and
timeline from all Elected Members; 
2. That delegated authority be given to the Executive Director with responsibility for
Development and Economic Growth, in consultation with the Leader and Depute
Leader of the Council, and Leader of the largest Opposition Group; to agree
expenditure on the projects that fit best for the 2022/23 allocation, following receipt of
any suggestions; and 
3. That arrangements are put in place which would facilitate Area Committees and / or
Area Community Planning Groups being involved in the discussions around the
2023/24 allocation of Place Based Investment funding prior to it coming before
Members for decision. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 21 July 2022, submitted) 
10. CLIMATE CHANGE UPDATE 
(a) Council Carbon Emissions & Climate Investment 2022 
The Committee gave consideration to a report highlighting the Council’s overall
annual carbon emissions for the most recent period 2020/21 and outlining that
changes to the process would be forthcoming in future months due to change in The
Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland)
Amendment Order 2020.  The report also invited the Policy Lead with the
responsibility for Climate Change to be a member of the Climate Change Board to
ensure a seamless link with regards to strategic leadership and operational delivery. 
Decision 
The Policy and Resources Committee – 
1. Noted the publication of the Council’s 2020/21 carbon emissions report and its
continued positive trend highlighting that carbon dioxide equivalent emissions
have reduced by 33% in past 6 years; 
2. Noted the climate change projects that would be developed in 2022 onwards that
are aligned to the additional £500,000 commitment that was allocated at the
February 2022 Council Budget; and   
3. Agreed to the inclusion of the Policy Lead with responsibility for Climate Change
as a member of the Climate Change Board. 
Page 20

Page 21

(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 14 July 2022, submitted) 
(b) Decarbonisation Plan - Action Tracker & Case Studies 
The Committee gave consideration to a report presenting the updated De-
carbonisation Plan Action Tracker and supplementary case studies providing
additional information on positive climate change work the Council was undertaking. 
Decision 
The Policy and Resources Committee noted – 
1. The progress of specific actions from the Decarbonisation Action Plan; and 
2. The supplementary case studies that provide information on positive climate
change projects being undertaken by different departments of the Council. 
(Reference:  Report by Executive Director with responsibility for Commercial
Services dated 11 August 2022, submitted) 
11. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - UPDATE -
EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS / REPORTING
REQUIREMENTS 
A report advising on the operation of the processes in regard to formal Asset Transfer
Requests (ATR) and Participation Requests in terms of the Community Empowerment
(Scotland) Act 2015; current live informal Expressions of Interest (EOI’s) which may
become subject to a formal asset transfer request or be dealt with outwith the formal asset
transfer request process; current live ongoing or agreed Participation Requests received
by the Council; and the annual reporting requirements in respect of Asset Transfer
Requests and Participation Requests set out in Section 95 and 32 of the Community
Empowerment (Scotland) Act 2015 respectively; was before the Committee for noting. 
Decision 
The Policy and Resources Committee noted the content of the submitted report and
agreed that this would be listed as a substantive item at the next meeting of the
Committee for discussion by all Members. 
(Reference:  Report by Executive Director with responsibility for Commercial Services
dated 27 June 2022, submitted) 
12. POLICY AND RESOURCES WORKPLAN 
The Policy and Resources Committee Workplan was before the Committee for noting. 
Decision 
The Policy and Resources Committee noted the content of the submitted workplan. 
Page 21

Page 22

(Reference: Policy and Resources Committee Workplan dated 11 August 2022,
submitted) 
Page 22

Page 23

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held in the ON A HYBRID BASIS BY
ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR REMOTELY BY
MICROSOFT TEAMS 
on THURSDAY, 11 AUGUST 2022 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Kieron Green
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle
Councillor Jim Lynch 
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Douglas Philand 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Shona Barton, Committee Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. FINAL PROPOSED AMENDED SCHEME FOR THE ESTABLISHMENT OF COMMUNITY
COUNCILS IN ARGYLL AND BUTE - 2022/26 
The Committee gave consideration to a report providing feedback following a recent 8
week public consultation to amend the current Scheme for the Establishment of
Community Council’s in Argyll and Bute (“the Scheme”) and inviting the Committee to
approve the Scheme attached at Appendix 4 to the report, as amended over the course of
the two stage public consultation in line with Appendices 1, 2 and 3 to the submitted
report. 
Decision 
The Policy and Resources Committee agreed to – 
1. Approve the final proposed amended Scheme for the Establishment of Community
Councils in Argyll and Bute for the term 2022/26; the amended Best Practice Guidance
2022/26; the boundaries for the community councils for term 2022/26; and the
administration grant levels for 2022/26 (as set out in Appendices 4-7); 
2. Instruct officers to give the requisite 4 week period of notice of the newly amended
Scheme; 
3. Delegate consideration of any feedback received during the 4 week period to the
Executive Director with responsibility for Legal and Regulatory Support, in consultation
with the Depute Policy Lead - Community Planning and Corporate Services; and   
Page 23 Agenda Item 4b

Page 24

1. Note that subject to there being no material changes proposed from the feedback
received, the newly amended Scheme would come into effect as of 20 October 2022 to
coincide with community council elections taking place on that date. 
(Reference:  Report by Executive Director with responsibility for Community Council
Governance dated 18 July 2022, submitted) 
Page 24

Page 25

MINUTES of MEETING of COMMUNITY SERVICES COMMITTEE held on a HYBRID BASIS BY
ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR REMOTELY BY
MICROSOFT TEAMS on THURSDAY, 25 AUGUST 2022 
Present: Councillor Yvonne McNeilly (Chair) 
Councillor Gordon Blair
Councillor Math Campbell-
Sturgess
Councillor Garret Corner
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe 
Councillor Dougie McFadzean
Councillor Iain Paterson
Councillor Gemma Penfold
Councillor Dougie Philand
Margaret Anderson, Church Rep
Reverend Sandy MacPherson, Church
Rep
Alison Palmer, Teacher Rep
Lorna Stewart, Teacher Rep 
Also Present: Councillor John Armour
Councillor Jan Brown
Councillor Robin Currie
Councillor Kieron Green 
Councillor Amanda Hampsey
Councillor Fiona Howard
Councillor Luna Martin
Councillor Ian MacQuire
Attending: Douglas Hendry, Executive Director
Jennifer Crocket, Head of Education: Lifelong Learning & Support
Wendy Brownlie, Head of Education: Learning & Teaching
Ross McLaughlin, Head of Commercial Services
Jane Fowler, Head of Customer Support Services
Stuart Mclean, Committee Manager
Louise Connor, Education Manager
Graeme McMillan, Transformation Programme Manager
Tony Blow, Stand Agency
Maggie Croft, Stand Agency
Superintendent Derek Lang, Police Scotland
Chief Inspector Simon Shanks, Police Scotland
Inspector Bart Simonis, Police Scotland
Group Commander Fraser Grant, Scottish Fire and Rescue Service
Fiona Davies, Chief Officer, Argyll & Bute HSCP
Stephen Whiston, Head of Strategic Planning, Performance & Technology,
Argyll & Bute HSCP
Kevin Anderson, General Manager, Live Argyll 
The Chair intimated that Councillor Kieron Green, who was not a member of the
Community Services Committee, had notified the Executive Director that he wished, in
terms of Standing Order 22.1, to speak but not vote on items 9 and 10 of the Agenda. 
The Chair confirmed that she would exercise her discretion to allow Councillor Green to
speak but not vote on items 9 and 10 of this Minute. 
The Chair intimated that Councillor Jan Brown, who was not a member of the Community
Services Committee, had notified the Executive Director that she wished, in terms of
Standing Order 22.1, to speak and vote on item 5 of the Agenda.  The Chair confirmed
that she would exercise her discretion to allow Councillor Brown to speak but not vote on
item 5 of this Minute.
Page 25 Agenda Item 4c

Page 26

The Chair intimated that Councillor John Armour, who was not a member of the
Community Services Committee, had notified the Executive Director that he wished, in
terms of Standing Order 22.1, to speak but not vote on items 5 and 11 of the Agenda. 
The Chair confirmed that she would exercise her discretion to allow Councillor Armour to
speak on items 5 and 11 of this Minute. 
The Chair intimated that Councillor Luna Martin, who was not a member of the Community
Services Committee, had notified the Executive Director that she wished, in terms of
Standing Order 22.1, to speak and vote on item 9 of the Agenda.  The Chair confirmed
that she would exercise her discretion to allow Councillor Martin to speak but not vote on
item 9 of this Minute. 
The Chair intimated that Councillor Julie McKenzie, who was a member of the Community
Services Committee but could not be in attendance today, had submitted a letter in
respect of item 9 of the Agenda.  It was noted that a copy of this letter had been circulated
to the Committee in advance of the meeting. 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest and Julie
McKenzie. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTE 
The Minute of the Community Services Committee held on 10 March 2022 was approved
as a correct record. 
4. THE ELECTION OF TEACHER REPRESENTATIVES TO THE COMMUNITY
SERVICES COMMITTEE 
A report advising the Committee on the appointment of two non-voting teaching
representatives to sit on the Community Services Committee to represent the teacher
workforce, was considered. 
Decision 
The Committee noted the content of the report and endorsed the appointments of Alison
Palmer and Lorna Stewart as the representatives nominated as non-voting members of
the Community Services Committee. 
(Reference: Report by Executive Director with responsibility for Education dated 25
August 2022, submitted) 
5. EDUCATION CHANGE PROGRAMME - SCHOOL LEADERSHIP STRUCTURES 
A report detailing the programme of engagement which Officers undertook with our
communities, our staff, their representative bodies and the wider group of stakeholders in
relation to the school leadership model proposals was considered.
Page 26

Page 27

The report set out the findings and outcomes of that consultation process and made a
number of recommendations in relation to the next steps for this element of the overall
process. 
The Committee also heard from Tony Blow from the Stand Agency who gave a
presentation on the analysis and findings of the engagement and consultation exercise
carried out with education professionals, pupils, community bodies, and the general public
on the school leadership model proposals. 
Motion 
To agree the recommendations detailed in the report by the Executive Director with
responsibility for Education. 
Moved by Councillor Yvonne McNeilly, seconded by Councillor Daniel Hampsey. 
Amendment 
1. In terms of the School Leadership consultation, the Community Services Committee
are invited to: 
a) note the outcomes and analysis of the extensive engagement and consultation
process, involving our communities, our staff and their representative bodies, our
school pupils, and the wider group of stakeholders; 
b) agree that the consultation exercise provided valuable feedback from teachers,
pupils and communities and identified areas where improved communication with
partners would be beneficial on an area by area committee basis.  Local area
forums involving members and parent teacher organisations in that area should be
established; 
c) recognise the commitment of the Education Service in striving to deliver the best
possible outcomes for the children and young people of Argyll and Bute, in line with
Members’ ambitions; 
d) agree that the proposals as consulted on are not progressed; 
e) note the continued use of shared headships as a useful operational tool to address
recruitment challenges only in those areas where there is consensus from staff and
parent teacher councils; 
f) agree that the Education Service, working with Head Teachers and Chairs of
Parent Councils, continue to work across all aspects of the Service to deliver
improvement, to address the implications of national reform, to address the key
issues raised in the consultation and other local and national challenges the
Service is encountering, and will continue to encounter (such as those detailed in
Sections 5 and 9.3 of this report and in Section 8 and Appendix 1 of this report). 
2. In terms of the wider attainment gap and variations between schools, the Community
Services Committee are invited to: 
a) Note the Audit Scotland findings that:
Page 27

Page 28

 The poverty-related attainment gap remains wide and inequalities have been
exacerbated by Covid-19.  Progress on closing the gap has been limited and
falls short of the Scottish Government’s aims, and 
 There is wide variation in education performance across councils, with evidence
of worsening performance on some indicators in some councils, and 
b) agree that the Education Service continues to address the variation in performance
within Argyll and Bute schools and work with Head Teachers at a local, and with
partners at regional level, to improve outcomes for children and young people. 
Updates on progress would be reported to Committee within the current
performance  reports; 
c) agree that, as a result of the outcome of this exercise the process undertaken
should be reviewed by our Audit and Scrutiny Committee to confirm best value in
senior staff time and consultancies; and 
d) agree that Officers should initiate an amended but deliverable programme to meet
the educational challenges ahead with improved structures in place allowing open
and constructive dialogue between all partners. 
Moved by Councillor Gordon Blair, seconded by Councillor Dougie Philand. 
A vote was taken by calling the roll. 
Motion     Amendment 
Councillor Garret Corner   Councillor Gordon Blair
Councillor Daniel Hampsey  Councillor Math Campbell-Sturgess
Councillor Graham Hardie   Councillor Dougie McFadzean
Councillor Andrew Kain   Councillor Iain Shonny Paterson
Councillor Paul Kennedy   Councillor Dougie Philand
Councillor Liz McCabe   Margaret Anderson
Councillor Yvonne McNeilly
Councillor Gemma Penfold
Reverend Sandy MacPherson 
The Motion was carried by 9 votes to 6 and the Committee resolved accordingly. 
Decision 
1. In terms of the School Leadership consultation, the Community Services Committee: 
a) noted the outcomes and analysis of the extensive engagement and consultation
process, involving our communities, our staff and their representative bodies, our
school pupils, and the wider group of stakeholders; 
b) agreed that the consultation exercise provided valuable feedback from teachers,
pupils and communities; 
Page 28

Page 29

c) recognised the commitment of the Education Service in striving to deliver the best
possible outcomes for the children and young people of Argyll and Bute, in line with
Members’ ambitions; 
d) agreed that the proposals as consulted on are not progressed; 
e) noted the continued use of shared headships as a useful operational tool to
address recruitment challenges; and 
f) agreed that the Education Service, working with Head Teachers, continue to work
across all aspects of the Service to deliver improvement, to address the
implications of national reform, to address the key issues raised in the consultation
and other local and national challenges the Service is encountering, and would
continue to encounter (such as those detailed in Sections 5 and 9.3 of the report
and in Section 8 and Appendix 1 of the report). 
2. In terms of the wider attainment gap and variations between schools, the Community
Services Committee: 
a) Noted the Audit Scotland findings that: 
 The poverty-related attainment gap remains wide and inequalities had been
exacerbated by Covid-19.  Progress on closing the gap has been limited and
falls short of the Scottish Government’s aims, and 
 There was wide variation in education performance across councils, with
evidence of worsening performance on some indicators in some councils; and 
b) agreed that the Education Service should continue to address the variation in
performance within Argyll and Bute schools and work with Head Teachers at a
local, and with partners at regional level, to improve outcomes for children and
young people.  Updates on progress would be reported to Committee within the
current performance  reports. 
(Reference: Report by Executive Director with responsibility for Education dated 12
August 2022, submitted) 
The Chair ruled, and the Committee agreed to adjourn the meeting at 1.10 pm for lunch. 
The Committee reconvened at 1.45 pm. 
6. ARGYLL AND BUTE - EDUCATION STRATEGIC PLAN 2022-24 AND
RECOVERY, RENEWAL AND PROGRESS REPORT 2021-22 
A report providing an update on the progress made by the Education Service in achieving
the priorities included in the Argyll and Bute Annual Education Plan for 2021-22 presented
to the Community Services Committee in August 2021, and outlining priority actions for
2022-24 was considered. 
Decision 
The Committee: 
Page 29

Page 30

1. noted the progress made with respect to priority actions within the 2021-22 Argyll and
Bute Annual Education Plan; 
2. approved the Education Strategic Plan 2022-2024 and Recovery, Renewal and
Progress Report 2021-22 (Appendix 1); 
3. approved the publishing of the Education Strategic Plan 2022-2024 and Recovery,
Renewal and Progress Report 2021-22; and 
4. approved the submission of the Education Strategic Plan 2022-2024 and Recovery,
Renewal and Progress Report 2021-22 to Scottish Government. 
(Reference: Report by Executive Director with responsibility for Education dated 1 July
2022 and Education Strategic Plan 2022-2024 and Recovery, Renewal and Progress
Report 2021-22, submitted) 
7. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - SKIPNESS PRIMARY
SCHOOL 
A report providing details of the outcome and findings of the statutory consultation
exercise undertaken in respect of the formal proposal to close Skipness Primary School
as detailed in the published Consultation Report (Appendix A); and in accordance with the
Schools (Consultation) (Scotland) Act 2010, as amended, was considered. 
Decision 
The Committee: 
1. noted the contents of the Consultation Report (Appendix A); and 
2. approved the implementation of the following proposals – 
a) Education provision at Skipness School be permanently discontinued with effect
from 1 December 2022, 
b) the pupils of Skipness Primary School’s catchment area continue to receive their
education at Tarbert Primary School on a permanent basis with effect from 1
December 2022, and 
c) the delineated catchment area of Tarbert Primary School be permanently extended
to subsume the whole delineated catchment area of Skipness Primary school from
1 December 2022. 
(Reference: Report by Executive Director with responsibility for Education dated 14 July
2022, and Consultation Report – Skipness Primary School dated August 2022, submitted) 
8. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - MINARD PRIMARY
SCHOOL 
A report providing details of the Option Appraisal for Minard Primary School, carried out in
accordance with the preliminary requirements set out in Section 12A of the Schools
(Consultation) (Scotland) Act 2010, as amended, was considered. 
Page 30

Page 31

Decision 
The Committee: 
1. noted the outcome of this consideration of the preliminary requirements; and 
2. agreed that Officers now formulate a draft closure proposal that would come back to
the June 2023 meeting of the Committee for approval by Members which would
subsequently trigger the formal consultation process under the Schools (Consultation)
(Scotland) Act 2010. 
(Reference: Report by Executive Director with responsibility for Education dated 30 June
2022 and Options Appraisal – Minard Primary School, submitted) 
9. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - LUING PRIMARY
SCHOOL 
A report providing details of the Options Appraisal for Luing Primary School, carried out in
accordance with the preliminary requirements set out in Section 12A of the Schools
(Consultation) (Scotland) Act 2010, as amended, was considered. 
Motion 
To agree the recommendations in the report by the Executive Director with responsibility
for Education. 
Moved by Councillor Yvonne McNeilly, seconded by Councillor Daniel Hampsey. 
Amendment 
To agree Option B as outlined within page 461 of the full meeting pack while ensuring
compliance with the necessary statutory obligations. 
Moved by Councillor Gordon Blair, seconded by Councillor Dougie McFadzean. 
A vote was taken by calling the roll. 
Motion     Amendment 
Councillor Garret Corner   Councillor Gordon Blair
Councillor Daniel Hampsey  Councillor Math Campbell-Sturgess
Councillor Graham Hardie   Councillor Dougie McFadzean
Councillor Andrew Kain   Councillor Iain Shonny Paterson
Councillor Paul Kennedy   Councillor Dougie Philand
Councillor Liz McCabe   Reverend Sandy MacPherson
Councillor Yvonne McNeilly
Councillor Gemma Penfold
Margaret Anderson 
The Motion was carried by 9 votes to 6 and the Committee resolved accordingly. 
Page 31

Page 32

Decision 
The Committee: 
1. noted the outcome of this consideration of the preliminary requirements; and 
2. agreed that Officers now formulate a draft proposal that would come back to the June
2023 meeting of the Committee for approval by Members which would subsequently
trigger the formal consultation process under the Schools (Consultation) (Scotland) Act
2010. 
(Reference: Report by Executive Director with responsibility for Education dated 30 June
2022 and Options Appraisal – Luing Primary School, submitted) 
10. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - ACHALEVEN
PRIMARY SCHOOL 
A report providing an update on the current situation of Achaleven Primary School, and
inviting the Committee to agree the recommendations therein, was considered. 
Decision 
The Committee: 
1. agreed that Achaleven Primary School should continue to be mothballed on a
temporary basis and the school premises be retained on a care and maintenance
basis; 
2. agreed that Officers should start the pre-consultation process and produce an Options
Appraisal paper for the March 2023 Committee meeting for a decision in relation to the
future of Achaleven Primary School; and 
3. noted that there had been no requests to use the building since 2021, however if any
did come forward they would be considered in light of the current condition of the
building, and any recommissioning works required. 
(Reference: Report by Executive Director with responsibility for Education dated 25
August 2022, submitted) 
11. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - SOUTHEND PRIMARY
SCHOOL 
A report providing an update on the current situation of Southend Primary School, and
inviting the Committee to agree to the recommendations therein, was considered. 
Decision 
The Committee: 
1. agreed that Southend Primary School should continue to be mothballed on a
temporary basis and that the building be retained on a care and maintenance basis; 
Page 32

Page 33

2. agreed that Officers should start the pre-consultation process and produce an Options
Appraisal paper for the March 2023 Committee meeting for a decision in relation to the
future of Southend Primary School; and 
3. noted that there had been no requests to use the building since 2021, however if any
did come forward they would be considered in the light of the current condition of the
building, and any recommissioning works required. 
(Reference: Report by Executive Director with responsibility for Education dated 27 June
2022, submitted) 
12. SCHOOL HOLIDAY DATES - 2023-2026 
A consultation on School Holiday Dates was carried out during May 2022 with an aim to
set the in-service days for teachers and the holiday dates for pupils across the authority
for 2023-2026.  The consultation included parents/carers, pupils and staff. 
The proposed dates, contained within Appendix 1 of this report, were before the
Committee for consideration. 
Decision 
The Committee agreed the school holiday dates for 2023-2026 contained within Appendix
1 of the report. 
(Reference: Report by Executive Director with responsibility for Education dated 25
August 2022 and School Holiday Dates 2023-2024 to 2025-2026, submitted) 
13. SQA SCHOOL EXAMINATION RESULTS 2022 
A report providing an update on the initial outcome of the Scottish Qualifications Authority
(SQA) 2022 examination diet for young people in Argyll and Bute was considered. 
Decision 
The Committee: 
1. noted the outcome of the initial SQA examination results for pupils in academic year
2021/22, and that the performance of Argyll and Bute Schools in 2022 was above the
current national performance in SQA examinations in three of the four measures
(National 4, Higher and Advanced Higher); and 
2. requested that the Executive Director provide further reports to the Committee to allow
the consideration of updated statistical school and national information, scheduled to
be released by Insight (school data analysis tool) in September 2022 and February
2023. 
(Reference: Report by Executive Director with responsibility for Education dated 10
August 2022, submitted) 
Page 33

Page 34

14. KEY PERFORMANCE INDICATORS FQ4 2021/22 - EDUCATION SERVICE 
A paper presenting the Committee with the FQ4 2021/22 Key Performance Indicators
(KPIs) for the Education Service was considered. 
Decision 
The Committee reviewed and scrutinised the FQ4 2021/22 KPI Report as presented. 
(Reference: Report by Executive Director with responsibility for Education dated 25 April
2022, submitted) 
The Chair ruled, and the Committee agreed to vary the order of business and take
Agenda items 16, 17, 18 and 19 next. 
15. ARGYLL & BUTE LOCAL POLICING PLAN (2020-2023) - QUARTERLY
REPORTS (QTR4 - 2021/22 & QTR1 - 2022/23) 
Superintendent Derek Lang presented the Quarter 4 – 2021/22 and Quarter 1 – 2022/23
updates in relation to the Argyll and Bute Local Policing Plan 2020 – 2023 and responded
to a number of questions asked. 
Decision 
The Committee reviewed and noted the contents of the reports. 
(Reference: Reports for Quarter 4 2021/22 and Quarter 1 2022/23 by Divisional
Commander for Argyll and West Dunbartonshire Division, Police Scotland, submitted) 
Councillor Gemma Penfold and Margaret Anderson, Church Representative, left the
meeting during consideration of the foregoing item. 
16. SCOTTISH FIRE AND RESCUE SERVICE - ARGYLL & BUTE PERFORMANCE
REPORTS Q4 1 JANUARY - 31 MARCH 2022 & Q1 1 APRIL - 30 JUNE 2022 
Group Commander Fraser Grant presented reports highlighting Scottish Fire and Rescue
Service’s review of local performance within Argyll and Bute for Q4 2021-2022 and Q1
2022-2023, and responded to a number of questions asked. 
Decision 
The Committee reviewed and noted the contents of the reports and passed on their
congratulations to Volunteer Fire Fighter John Fraser of Coll, who had been awarded the
Queens Fire Service Medal earlier this year, and also to on call Fire Fighter Lorraine
Taylor who marked 32 years in the fire service at Tarbert. 
(Reference: Q4 2021-2022 and Q1 2022-2023 Reports by Local Senior Officer, Scottish
Fire and Rescue Service, submitted) 
17. ARGYLL & BUTE HSCP - PERFORMANCE REPORT MAY 2022 
Consideration was given to a report which provided an update on the impact of service
performance with regards to the Covid-19 Pandemic and the progress made with regard
Page 34

Page 35

to remobilising health and social care services in Argyll and Bute up to 31 March 2022,
which was presented to the Integration Joint Board (IJB) in May 2022. 
Decision 
The Committee considered and noted the IJB Health and Social Care Partnership report
presented to the IJB in May 2022. 
(Reference: Report by Head of Strategic Planning, Performance & Technology, Argyll &
Bute HSCP dated May 2022, submitted) 
18. LIVE ARGYLL 
(a) Monitoring and Performance Reporting - Update Report 
A report providing the Committee with an update on the performance and monitoring
arrangements between Live Argyll and the Council as set out in the various
agreements between the Council and the Trust was considered. 
Decision 
The Committee noted and considered the contents of the report. 
(Reference: Report by Executive Director with responsibility for Commercial
Services dated 9 August 2022, submitted) 
(b) Live Argyll Annual Report 2021/22 
Consideration was given to Live Argyll’s Annual Report for 2021/22. 
Decision 
The Committee reviewed and noted the contents of the report and passed on their
congratulations to Eleanor McKay who had been awarded a Members of the Order
of the British Empire (MBE) during lockdown for services to local studies. 
(Reference: Live Argyll Annual Report 2021/2022, submitted). 
19. SERVICE ANNUAL PERFORMANCE REVIEWS 2021/22 - EDUCATION
SERVICE 
The Council’s Performance and Improvement Framework (PIF) sets out the presentation
process for regular performance reporting. 
A paper presenting the Community Services Committee with the Service Annual
Performance Review and Scorecard 2021/22 for the Education Service was considered. 
Decision 
The Committee reviewed and approved the Service Annual Performance Review (Service
APR) and Scorecard 2021/22 as presented prior to publishing on the Council website. 
Page 35

Page 36

(Reference: Report by Executive Director with responsibility for Customer Support
Services dated 13 July 2022, submitted) 
20. COUNSELLING IN SCHOOLS 
A paper presenting an update on the delivery and impact of the first 18 months of the
Counselling in Schools service was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Education dated 18 July,
2022, submitted) 
21. CARE EXPERIENCED CHILDREN AND YOUNG PEOPLE 
A report providing an update on information about interventions being taken within
Education Services to ensure that Care Experienced Children and Young People achieve
the best possible educational outcomes, as agreed at the Community Services Committee
on 10 June 2021, was before the Committee for information. 
The report also detailed the expenditure against the grant allocated by Scottish
Government to Argyll and Bute Council for session 2021/22 from the Scottish Attainment
Challenge Care Experienced Children and Young People Fund. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Education dated 25
August 2022, submitted) 
22. SCOTTISH ATTAINMENT CHALLENGE 
A paper providing an update on the refreshed Scottish Attainment Challenge which is
supported by funding through the Attainment Scotland Fund, the aims of which are to
address the challenges of the poverty related attainment gap, was before the Committee
for information. 
The paper also included an overview of the 2022-23 Scottish Government Pupil Equity
Funding (PEF) allocations for Argyll and Bute schools eligible to receive PEF funding
(Appendix 1), the draft authority ‘core’ stretch aims (Appendix 2), and an overview of the
planned Strategic Equity Fund (SEF) spend. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Education dated 30 June
2022, submitted) 
Page 36

Page 37

23. OUR CHILDREN, THEIR NURTURING EDUCATION 
A report advising on the authority wide Our children, their nurturing education strategy that
brings together nurture, adverse childhood experiences and trauma-informed practice,
was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Education dated 18 July
2022, submitted) 
24. EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
A report providing details of all external establishment inspection reports received across
Argyll and Bute Education Service during the period January to June 2022 was before the
Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Education dated July
2022, submitted) 
25. PERIOD PRODUCTS: LAUNCH EVENT PLAN 
The Period Products (Free Provision) (Scotland) Act 2021 becomes law in August 2022,
and all local authorities must have a robust service in place by this time. 
A paper outlining how the Council is launching this service into a recognisable and
accessible scheme for all who need to use the service was before the Committee for
information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Commercial Services
dated 1 August 2022, submitted) 
26. GAELIC LANGUAGE PLAN PROGRESS REPORT 
A report providing an update on progress in delivering the actions in the approved Argyll
and Bute Council Gaelic Language Plan was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services dated 25 August 2022, submitted
Page 37

Page 38

27. COMMUNITY SERVICES COMMITTEE WORK PLAN 2022/2023 
The Community Services Committee work plan for 2022/2023 was before the Committee
for information. 
Decision 
The Committee noted the contents of the work plan. 
(Reference: Community Services Committee Work Plan 2022/2023, submitted) 
28. LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) UPDATE -
POTENTIAL BID FOR NEW MULL CAMPUS 
The Learning Estate Investment Programme (LEIP) is the Scottish Government’s flagship
programme for investment in education and is now into Phase 3.  It is the successor to the
‘Schools for the Future’ programme which the Council has delivered new builds or
substantial refurbishments across the education estate at Oban, Kirn, Dunoon,
Campbeltown, Lochgilphead etc.   
A report providing an update on a potential bid to the fund for a new Mull Campus was
considered. 
Decision 
The Committee noted and considered: 
1. the Scottish Government had recently confirmed the timescales for the next round of
Learning Estate Investment Programme (LEIP) ie inviting submissions by 31 October; 
2. that an Outline Business Case was being prepared for a potential submission to the
LEIP process for a new Campus on mull in line with the adopted Learning Estate
Strategy; 
3. that pre-engagement activity had been ongoing with Mull community about the
potential LEIP bid over recent weeks and there had been a number of workshops and
meetings in August 2022.  Further statutory consultation would take place if a bid was
made and successfully progressed to the next stage; 
4. the financial position and affordability of a LEIP bid as set out in attached Appendix B.
The appendix is publically exempt due to the commercially sensitive nature of financial
forecast information contained; and 
5. that a paper outlining the Council’s approach to LEIP, including feedback from the pre-
engagement with the community, would be presented to Council on 29 September.  If
a bid was progressed a submission would be required by 31 October 2022. 
(Reference: Report by Executive Director with responsibility for Commercial Services and
Education dated 25 August 2022, submitted) 
Page 38

Page 39

MINUTES of MEETING of ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE held ON A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE COUNCIL
CHAMBER, KILMORY, LOCHGILPHEAD 
on THURSDAY, 1 SEPTEMBER 2022 
Present: Councillor Robin Currie (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Garret Corner
Councillor Andrew Kain
Councillor Donald Kelly
Councillor Jim Lynch 
Councillor Ian MacQuire
Councillor Luna Martin
Councillor Ross Moreland
Councillor William Sinclair
Councillor Andrew Vennard
Councillor Peter Wallace 
Attending:  Kirsty Flanagan, Executive Director
Jim Smith, Head of Roads and Infrastructure Services
Fergus Murray, Head of Development and Economic Growth
Stuart McLean, Committee Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Mark Irvine and Tommy
MacPherson. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
The Minutes of the meeting of the Environment, Development and Infrastructure
Committee held on 2 June 2022 were approved as a correct record. 
4. SERVICE ANNUAL PERFORMANCE REVIEWS 2021/22: DEVELOPMENT AND
ECONOMIC GROWTH SERVICES & ROADS AND INFRASTRUCTURE
SERVICES 
The Committee gave consideration to a report presenting the Service Annual Performance
Reviews and Scorecard 2021/22 for the Development and Economic Growth, and Roads
and Infrastructure Services. 
Decision 
The Environment, Development and Infrastructure Committee approved the Service
Annual Performance Reviews (Service APRs) and Scorecards 2021/22 as presented prior
to publishing on the Council Website. 
(Reference:  Report by Executive Director with responsibility for Customer Support
Services dated 13 July 2022, submitted) 
Page 39 Agenda Item 4d

Page 40

5. WINTER SERVICE POLICY 2022-23 
The Committee gave consideration to a report presenting the Council’s Winter Service
Policy for approval.  The policy for 2022/23 remained similar to that of the policy for
2021/22. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. approved the 2022/23 Winter Maintenance Policy Document at Appendix 1 to the
submitted report;  
2. approved the Salt Use Reduction and Preservation of Stock Protocol at Appendix 2 to
the submitted report; 
3. noted the Advisory signing, routes unsuitable in severe conditions at Appendix 3 to the
submitted report; 
4. noted the Frontline Treatment Vehicle Fleet at Appendix 4 to the submitted report; 
5. noted the Salt Stocks monitoring and resilience record at Appendix 5 to the submitted
report; and  
6. noted the weather summary from 2021/22 at Appendix 6 to the submitted report. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
dated August 2022, submitted)   
6. FOOTWAYS RECONSTRUCTION PROGRAMME 2022-23 
The Committee gave consideration to a report providing a programme of Footway
Reconstruction Schemes for 2022/23.  The Council had awarded £500k at its Budget
Meeting in February 2022 and the budget had been allocated by proportion of the footway
inventory values in each geographical area, and was set out in each appendix to the
report. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. endorsed the programme of capital works for 2022/23; and 
2. agreed that details of each Area Committee programme would be forwarded on to the
respective Ward Members.   
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
dated August 2022, submitted) 
Page 40

Page 41

7. STREET LIGHTING CAPITAL IMPROVEMENTS/LED PROJECT AND
REPLACEMENT COLUMNS PROGRAMME 2022-23 
The Committee gave consideration to a report providing details of the proposed Street
Lighting Reconstruction Programme for 2022/23. The programme was based on an
allocation of £740,000, comprising of £440,000 of Capital allocation from this year and the
previous financial year, and an additional £300,000, awarded through the budget process,
to deal with defective columns and cabling. 
Decision 
The Environment, Development and Infrastructure Committee endorsed – 
1. the Street Lighting Capital Improvements Programme for 2022/23; and 
2. the LED and Replacement Column Programme for 2022/23. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
dated August 2022, submitted)   
8. TRANSFORMATIONAL PROJECTS & REGENERATION TEAM - LARGE SCALE
PROJECT UPDATE REPORT 
The Committee gave consideration to a report providing an update on the progress of the
large scale, externally funded, project work of the Transformational Projects and
Regeneration Team, highlighting key issues that could impact on the successful delivery
of the projects. 
Decision 
The Environment, Development and Infrastructure Committee noted the current progress
contained within the submitted report. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 31 July 2022, submitted) 
9. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - ALLOTMENTS
WAITING LIST REGISTER 
A report providing an update on the ongoing actions that were being undertaken in
response to duties placed on the Council under Part 9 of the Community Empowerment
(Scotland) Act 2015 was before the Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
submitted report. 
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support dated May 2022, submitted) 
Page 41

Page 42

10. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORKPLAN 
The Environment, Development and Infrastructure Committee Workplan was before the
Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
Workplan. 
(Reference:  Environment, Development and Infrastructure Committee Workplan dated
September 2022, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraph 6
of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
11. WASTE STRATEGY UPDATE 
The Committee gave consideration to a report providing an update on the work relating to
the Waste PPP contract and on the options appraisal work streams being taken forward. 
Decision 
The Environment, Development and Infrastructure Committee noted – 
1. the report and the approach being taken to determine the most appropriate option for
the Council regarding waste disposal; 
2. the good progress being made in relation to the options appraisal; and 
3. that a further report detailing the full appraisal and proposed next steps will come
forward to the December EDI committee, providing information on the preferred option
and outlining any capital and revenue cost implications. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
dated August 2022, submitted) 
Page 42

Page 43

ARGYLL AND BUTE COUNCIL  COUNCIL   
29th September 2022 
LEADER’S REPORT 
1. INTRODUCTION 
1.1 The Leader of the Council and Policy Lead Councillors routinely provide a
report outlining their strategic activities for consideration at each meeting of
Argyll and Bute Council, except for the annual budget meeting in February. 
1.2 This report provides an update on the activities of the council Leader, Cllr
Robin Currie, for the period 18th June to 15th September 2022. 
1.3 This report also includes an update in respect of the Leader’s Policy Lead
portfolio of Economy and Rural Growth. 
2. RECOMMENDATIONS 
2.1 Members are asked to consider the report.   
2.2 Members are asked to note that any reports, briefings or copy
correspondence referred to in the report can be requested as appropriate
through the Leadership Support Manager, although it should be noted that
some confidential reports provided by external organisations such as
COSLA may be restricted. 
3. LEADER ACTIVITY 18th JUNE 2022 TO 15TH SEPTEMBER 2022   
3.1  COSLA MEETINGS 
This period has required attendance at several COSLA Leaders and
Special Leaders meetings - many of the latter convened at short notice
and in response to the fast-moving and complex circumstances around
national local government pay negotiations. 
As is very often the case, the majority of matters are considered in private
session. I have noted below the topics considered and would remind
Page 43 Agenda Item 5

Page 44

members of the opportunity to make arrangements for access to any
confidential papers as highlighted at para. 2.2. 
Special Leaders, 4th July 
This meeting was called to deal with the following items of urgent
business:  
 National Care Service Bill
 Asylum Dispersal and Consultation Response 
Special Leaders, 5th August
The Depute Leader attended this session on my behalf. The following
items were considered: 
 Pay Claim
 Ukrainian Displaced Persons 
Special Leaders, 12th August
An additional Leaders meeting was required one week later, again to
consider the Local Government Pay Claim. 
Leaders, 26th August
This normal scheduled meeting of Leaders considered the following: 
 COSLA response to the National Care Service Bill Call for Views
 Learning Estate Investment Programme
 Local Government Finance
 Social Justice and Social Security Committee report on Low
Income and Debt
 Flood Risk Management Affordability Review
 National Strategy for Economic Transformation 
 Business Support Partnership Delivery Plan
 Climate Emergency
 Social Care Workforce
 Suicide Prevention
 Distribution 
Special Leaders, 27th August
The Pay Claim situation was escalating to the extent that an additional
Special Leaders meeting had to be called for Saturday 27th August at
extremely short notice. 
Special Leaders, 2nd September
The meeting of 26th August was not able to complete all business items
and an additional session had to be called to cover the latest Pay Claim
Page 44

Page 45

position as well as the COSLA response on the NCS bill, Ukraine, and an
additional item - Full Asylum Dispersal Plan for Scotland. 
3.2 Housing Matters: 
More new affordable homes for island communities 
On 21st July, I was delighted to carry out the official opening of Otter Brae
- a ten-home development in Craighouse, Isle of Jura, delivered in
partnership with West Highland Housing Association, the Council, Ardfin
Estate, the Scottish Government and contractors Macleod Construction. 
This development comprises eight 2-bed and two 3-bed homes. Jura
Community Council has worked closely with West Highland Housing
Association on a local lettings plan - the result being that people who live
and work, have the offer of work, or who have strong local connections on
the island, are able to access homes they need and that they can afford. 
Rhoda Grant MSP was also in attendance and this provided an
opportunity to catch up with her about a range of issues that affect island
life and the wider Argyll and Bute community, including the A83, ferry
capacity and other transport matters. 
Page 45

Page 46

ACHA engagement: 
On 25th July I had an introductory call with Michelle Mundie, who has
joined Argyll Community Housing Association as its new Chief Executive.
Michelle brings considerable experience in both the housing sector and
local government, including a spell at Glasgow City Council where she
had responsibility for the city’s Affordable Housing Supply Programme. I
look forward to working with Michelle going forward. 
Other housing matters: 
During the period covered by this report, I have attended regular meetings
and forums on housing including: 
Argyll and Bute Strategic Housing Forum, 21st June: 
As always, this forum - which brings together key stakeholders from
external partners as well as across council services - yielded useful and
constructive discussions. The following issues were considered: 
 Housing Service Performance Report 2021/22 (key highlights are
noted below)
 Scottish Government More Homes Division update
 Housing and Planning Update
 RSL Updates - Development Projects
 Community-led Housing Projects Update
 Housing and Economic Growth
 Energy Efficiency
 Wellbeing
 Care and Repair Update
 Veterans/Armed Forces Housing 
Key highlights of note from the Performance Report include: 
 143 affordable home completions through the Strategic Housing
Investment Programme in 2021/22
 235 active empty homes cases open - with 38 empty properties
brought back into use as affordable homes, over half of which had
been empty for between two and ten years. 
 1,196 households in the Home Energy Efficiency Programme
(HEEPS)
 £0.552m spend in Private Sector Housing Grants in 21/22 
Page 46

Page 47

3.3 Campbeltown Working Group with Minister for Business, Trade,
Tourism and Enterprise, 4th August: 
I joined officers and partners in attending the Campbeltown Working
Group’s most recent meeting, welcoming the attendance in person of Ivan
McKee MSP, Minister for Business, Trade, Tourism and Enterprise. 
The Minister had an opportunity to visit sites around Kintyre including
MACC, and he was clearly impressed with the potential that exists there
as well as the work already done. 
While it was helpful to hear about what has been done already, it is
equally important to consider what needs to happen next - and now. As an
example, connectivity was cited as one of the main challenges and
barriers to growth. We need an urgent response to issues like this - and a
response that consists of urgent action, given the scale of challenges like
this. I intend to continue following up on this with the Minister. 
We touched briefly at the meeting on the interventions made in Dundee
when the Michelin plant closed down, and arguably the extent of the
economic challenges that have beset Kintyre in recent years have the
same level of impact and require the same level of intervention and
support. 
I had an opportunity for a short private discussion with Mr McKee prior to
the meeting and it was good to hear that he had travelled to Campbeltown
by road, rather than flying in from Glasgow. This would have given him an
opportunity to see at first hand the practicalities of travelling to and from
Kintyre and throughout rural Argyll, illustrating perhaps some of the
challenges involved in service delivery in Argyll’s rural and island
communities. He would also, of course, have used the A83 at a busy
period and I hope that he takes the opportunity to relay his experiences to
ministerial colleagues at the Scottish Government while deliberations -
and work, and traffic lights - are ongoing in relation to the longstanding
landslide damage and establishing a permanent solution. 
3.4 Rothesay Pavilion Lobbying Group: 
We have had two meetings of the Rothesay Pavilion Lobbying Group in
the period covered by this report - including a visit to the Pavilion itself on
10th August - and a further meeting on 13th September. This provided an
opportunity for group members to see both the Pavilion’s current position
and hear about its potential from Rothesay Pavilion Charity
representatives, who were also in attendance. 
Page 47

Page 48

Officers have been liaising with the Charity on a fundraising plan and, as
part of that activity, I have written to Scottish ministers seeking a
discussion about the Pavilion, given its importance not only to Bute but in
terms of national architectural significance. 
My office is also liaising with Jenni Minto MSP’s team to arrange an initial
discussion about this matter. In the meantime, liaison with the Charity on
this crucial plan will continue and I will report back on any responses from
ministers. 
3.5 A83 Rest and Be Thankful 
Members will recall that in my last report I advised that I had written to
Jenny Gilruth MSP, Minister for Transport, in relation to the urgency for
action on a permanent solution at the rest. 
We subsequently heard that Ms Gilruth would be visiting Oban on 18th
August and would be available to meet with myself and officers. 
The Harbour Building in Oban, with its overview of the busy bay and
pontoon facility, was the ideal location for a meeting to focus largely on
transport-related issues. 
Page 48

Page 49

The Minister had asked to discuss the Bus Partnership Fund project and
we were able to provide her with an update on this. I also raised the
matter of ferry capacity particularly on our island routes. Ms Gilruth
indicated that the Project Neptune report was due to be published soon
and, indeed, at the time of writing it has now been made available online. I
will want to take time to carefully consider the report and it goes without
saying that, given the importance of reliable ferry services and adequate
capacity on these lifeline routes, we will continue to lobby on this as a
matter of priority. 
It was reassuring to hear the Minister say that resolving the Rest was a
key priority for her. Since that meeting of course we have had a further
announcement about a £25m investment in progressing design and
development work, with medium term proposals due by the end of the
year and a decision on the preferred long term route option by spring next
year. 
Page 49

Page 50

Elsewhere on this agenda is a motion which I hope will secure backing
across the chamber, given our historic unity on this matter of urgent
importance for Argyll and Bute and its future success. 
I had also noted in my last report that I was in contact with the RABT
Campaign Group about inviting them to a seminar for all councillors. Our
original date of 8th September was rescheduled to 22nd September and the
seminar will have taken place before the council meeting. 
3.6 HRH The Princess Royal - Visit to Loch Fyne, 6th September: 
I was delighted to be invited by Tarbert Harbour Authority for a visit from
Her Royal Highness The Princess Royal on 6th September. The Princess
was in the area to visit both sides of Loch Fyne. She had first visited the
Kyles of Bute, where she went to Tighnabruaich Sailing School and Kyles
Camans, who manufacture traditional shinty sticks. 
She then crossed the loch - by air - to visit the Harbour Authority and view
the new shoreside facilities it has put in place. 
Her final engagement in Tarbert was to visit the Argyll South Branch of the
Pony Club. 
It certainly seems to be the case that Her Royal Highness enjoys her visits
to Argyll and has a real affection for the area. As has happened before,
she spent a lot of time talking to local people and those involved with each
of the organisations that she visited, clearly very much to their delight. 
Photo by Kevin McGlynn 
Reviewing photos and memories of the day are of course particularly
poignant given the very sad events just a few days later, when Her
Majesty The Queen passed away. It is my intention to write a letter of
Page 50

Page 51

condolence to the Princess, expressing sadness and sympathy at the very
sad loss she experienced so soon after the visit. 
3.7 Economy and Rural Growth Policy Lead Update: 
Levelling Up Fund: Members have been provided with a range of
information on the Levelling Up Fund bids that officers have worked hard
on, and I was delighted to be informed that two bids were submitted in
August for consideration.  
 The Regeneration Bid up to £20m – Argyll and Bute Western
Seaboard Marine Gateways Initiative – Rothesay and Dunoon.  
 The Transport Bid up to £50m – Connected Argyll and Bute –
Whisky Islands; and North Lorn Economic Growth Zone. 
Further detail on each of the bid and the Levelling Up Fund can be found
in officer’s report to Council in June UK LEVELLING UP FUND UPDATE
AND BID SUBMISSION June22.pdf (argyll-bute.gov.uk) 
I feel the two submissions made are strong and stand a good chance of
success, but it must be noted that this is a competitive process and I look
forward to hearing the outcome of the UK Government’s decision.   
I am due to meet with Lord Offord, Parliamentary Under-Secretary of State
for Scotland, in the near future (our original meeting due on 13th
September was cancelled following the sad passing of Her Majesty Queen
Elizabeth II). I will be taking the opportunity to promote Argyll and Bute’s
bid at our rescheduled discussion. 
UK Shared Prosperity Fund (UKSPF): Argyll and Bute’s UK Shared
Prosperity Fund Investment Plan was put before members in August at
the Policy and Resources Committee.  The UKSPF is a successor to the
previous EU structural funds, it is viewed as a central pillar of the UK
Government’s Levelling Up agenda. The overarching aim of the UKSPF is
to build pride in place and increase life chances across the UK. The Plan
will be delivered over a period of three years, and officers have prepared
this plan in conjunction with colleagues and local partners/stakeholders,
as well as with endorsement and support from our MP.  Further
information on the Investment Plan can be found ARGYLL AND BUTE UK
SHARED PROSPERITY FUND INVESTMENT PLAN.pdf (argyll-
bute.gov.uk) 
Love Local Gift Card: The Argyll and Bute Love Local Gift Card formally
launched in October 2021 and there are currently 110 businesses registered
to accept the gift card as payment for goods and services throughout Argyll
and Bute, with more businesses in the process of registering to join the
scheme.  This is a great tool for Argyll and Bute and boosts spend and
Page 51

Page 52

support to local businesses.  I know Members will agree that we should
encourage more businesses to take up this great opportunity 
Argyll and Bute Scotland Loves Local Gift Card (argyll-bute.gov.uk) 
Rural Growth Deal: The Rural Growth Deal (RGD) Programme
Management Office (PMO) continue to work with the Scottish and UK
Governments and key stakeholders to progress the signing of the Full
Deal Agreement which represents the next key milestone of the RGD
process. We have the consultancy Stantec to support the preparation of
Treasury 5 business cases which are required by central government in
order to sign the Full Deal Agreement. It is anticipated that the majority
business cases will be submitted to government for initial feedback
towards the end of 2022 / early 2023 and a draft programme of works has
been prepared by Stantec. 
The RGD PMO are also in the process of drafting the various documents
which will form the Full Deal Agreement including an Implementation Plan,
Governance Plan, Communication Plan and Full Deal Agreement
document. The RGD PMO have also been supporting colleagues to
progress a number of grant funding bids in support of several projects
within the RGD programme including bids to the UK Government’s
Community Renewal and Levelling Up Funds and the Scottish
Governments Clyde Mission Fund. The Council will continue to work with
potential funding partners to identify synergies between the Rural Growth
Deal and other national funding programmes which is particularly
important given current inflationary budget pressures. 
Officers also continue to work with the National PMO network to identify
best practise with regard to the delivery of city region and growth deal
programmes including maximising the potential of deals to support
inclusive economic growth, act as a catalyst for business growth and
support the transition towards net zero. 
Heritage and Place Programme: It was agreed at the Policy and
Resources Committee on 16th June that an expression of interest (EOI) be
made to Historic Environment Scotland based on which of the two
suggested conservation towns, Tarbert and Tobermory, were considered
to best fit with the criteria and therefore hopefully stand the best
opportunity of success, bearing in mind that this will be a highly
competitive process.  Following assessment of both bids by officers, I am
delighted that Tarbert has been put forward under the Expression of
Interest for this funding.  Officers will continue to look at what funding
options are available to improve Council assets and assets throughout
Argyll and Bute.   
Page 52

Page 53

3.8 Gaelic Policy Lead Update: 
Highlights from the council’s Gaelic language activity include:
 Successful Argyll Gaelic Gathering 2022 held online with 55
participants.  Actions from the Gathering have been compiled and
have been shared with other stakeholders.
 Furan Gaelic Centre continues to support a wide range of Gaelic
activity, both face to face and online.  This includes working with
Alzheimer’s Scotland, Coraidh is Cabadaich air an Lèanag at
Dunollie House and Gaelic Bookbug sessions for children and their
families.  
 There has been a 50% increase in unique traffic to the council’s
Gaelic webpages over the period June 2021-June 2022 compared
with the previous two years.
 Comunn na Gàidhlig Officers continue to be active on Islay, Jura
and Mull engaging young people in Gaelic Medium Education with
in and out of school activities.
 The Royal National Mod will be taking place in Oban in 2024.  A
working group is being set up by Economic Development.
 Gaelic Culture Officer has been employed by CHARTS (Culture
Heritage and Arts, Argyll and the Isles) for 12 months with funding
from Bòrd na Gàidhlig.  
 A further round of Strategic Events and Festivals (SEF) funded via
the council in 2022/23 was offered to address challenges of fragility
and to acknowledge the period of recovery required for this sector.
Those that provided support to Gaelic culture for round 4.2 include:
Tiree Music Festival, Argyllshire Gathering and Tarbert Music
Festival.
 Gaelic Development Worker consulting with community around
Gaelic Community Hubs which was an action identified via the
Argyll Gaelic Gathering.  40 people have shown interest and two
workshops have created a collection of ideas and actions that
participants will look to take forward. 
4. CONCLUSION 
4.1 This report highlights the activities of the Leader of Argyll and Bute
Council for the period from 18th June to 15th September 2022.   
Councillor Robin Currie
Leader, Argyll and Bute Council 
15th September 2022
For further information or to access the Leader’s Report Pack please contact
Aileen McNicol, Leadership Support and Member Services Manager, telephone
01546 604014 or email aileen.mcnicol@argyll-bute.gov.uk
Page 53

Page 54

This page is intentionally left blank

Page 55

ARGYLL AND BUTE COUNCIL  COUNCIL   
29th September 2022 
POLICY LEADS REPORT 
1. INTRODUCTION 
1.1 This report provides members with an update on key areas of activity for
each Policy Lead Councillor. This aims to provide updates from all Policy
Leads as regularly as possible, so that all members are informed, up-to-
date and able to engage with current issues. 
1.2 Policy Leads were appointed by Council on 18th May 2022. This is the
first Policy Leads Report of the new Council term. 
2. RECOMMENDATIONS 
2.1 Members are asked to consider the report. 
3. POLICY LEAD FOR FINANCE AND COMMERCIAL SERVICES –
Councillor Gary Mulvaney   
3.1  Introduction: This report provides members with an update on my
activities as Depute Leader and Policy Lead for Finance and
Commercial Services during the period from May till September 2022 
3.2  Financial Services Team: Officers continue to work on the budget
outlook and this is formally reported to each Policy and Resources
Committee. The latest budget outlook reported to P&R advised that in
the mid-range scenario, the budget gap estimated over the five-year
period is £36.493m with a gap of £7.980m in 2023-24. Three factors
materially affect this – our grant from Scottish Government; inflation;
and pay award pressures. In terms of grant the working assumption is
a 1% reduction in SG funding, and that will be confirmed in December. 
Page 55 Agenda Item 6

Page 56

The current non-pay inflation estimated for 2023-24 amounts to
£4.291m and this compares to an estimate of £1.164m in August last
year.  The increased cost of inflation is putting significant pressure
onto the Council budget. 
In terms of the pay award, we budgeted for 2% for 22-23 like most
other councils. Recent negotiations between COSLA and the Scottish
Government have suggested a pay award averaging just over 5%,
once minimum and maximum uplifts and extra days’ holiday are
accounted for. The unfunded gap for councils’ is 1.5% and creates an
unfunded pressure of circa £2.5m for current and future years. Officers
will also change the pay award assumption for next year to 3.5%. This
will increase the budget gap in 2023-24 by over £4.75m. 
Officers have commenced work on the budget approach for 2023-24
with a detailed review of service provision and the high level approach
was discussed at a meeting earlier this month of the cross-party
Budget Working Group. 
3.3  Local Tax Collections: The Council Tax collection rate at the end of
August 2022 is 50.72%, 2.98% up on the same time last year.  The
increased collection is due to the £4.33 million cost of living award that
was allocated directly to Council Tax accounts at the start of the year
although it should be noted that on a month to month basis the level of
increased collections is reducing. 
There are challenges reported by sheriff officers in collection
performance post summons related to the cost of living crisis and as we
are passing over less debt to them this year to collect as debtors in
receipt of benefit increases. 
The Non-domestic rates (NDR) collection rate at the end of August 2022
is 62.21%, down 1.92% in comparison to the previous year.  This
variation is because of movements in the level of rates relief we have
been able to offer businesses between these years. 
3.4 Benefits Update:
Benefits Processing: As at 31st August 2022 processing speeds for
Housing Benefit show average processing times of 27.97 days for new
claims and 8.56 days for change in circumstances for the year from 1st
April. Performance is improving month to month, in August new claims
were processed on average every 24.6 days and changes 7.5 days,
despite being short on resources due to sickness and maternity leave. 
Page 56

Page 57

Scottish Welfare Fund (SWF) and Discretionary Housing Payments
(DHPs): Expenditure in SWF and DHP has increased in quarter 2 and
at this stage we are not projecting costs over the annual budget of
£458,827 for SWF or £961,000 for DHP. 
Flexible Food Fund: The Flexible Food Fund project has been extended
for a further year given the current crisis in relation to the cost of living
and the increase in energy costs. At the end of July the project has
delivered £1,746 million of additional income for 1310 families across
Argyll and Bute an average of £1,330 per household. Half of the
households being supported are single adults living alone, 30% are
single parents and 15% are families with children in the household. 
3.5 Commercial Services Update: 
Launch of My Tribe Initiative: free period products are now widely
available to everyone in Argyll and Bute, following the Scottish
Government’s Period Products (Free Provision) (Scotland) Act 2021
becoming law in August.  Commercial Services arranged two
successful launch events at Helensburgh Civic Centre on 24th August
and at Lochgilphead Joint Campus on 25th August.   
Helensburgh Leisure Centre:  the new £22M state of the art leisure
centre is now complete and was officially handed over by contractors
Heron Bros Ltd at start of August, on time, despite the global
construction challenges being faced, which is a fantastic achievement
by all involved.  The centre, which will be operated by Live Argyll,
opened its doors to the public on 3rd September and an official civic
opening will take place on 7th October 2022. 
Learning Estate Investment Programme (LEIP):  Commercial Services
are leading the preparation of a bid to the Scottish Government’s
highly competitive LEIP.  Mull has been identified as the priority area
across the whole school estate and a public pre engagement exercise
was run until 9th September to seek initial views from the island
community on a potential new campus.   
Food for Life Award:  Argyll and Bute Council’s schools catering
service has received The Soil Associations’ Bronze Food for Life
Served Here Award for the 10th year in a row. This year’s
accreditation also includes meal provision for the area’s early years
settings, meaning that even more young people are able to benefit
from healthy, sustainable school meals – 125 schools in total. The
award recognises food establishments that serve
fresh, environmentally sustainable and ethical food, make healthy
eating easy and champion local food producers. 
Page 57

Page 58

Rothesay Pavilion:  the latest meetings of the lobbying group took
place on 10th August, which included a site visit, and 13th September.
An action plan has been agreed to progress lobbying activity as a
matter of urgency.   
3.6.  Depute Leader: 
I have regular other meetings with the Leader, Policy Leads and the
Chief Executive in respect of council business and priorities. In addition I
have deputised for the Leader at COSLA and attended meeting and
development sessions of the HSCP. 
4. POLICY LEAD FOR EDUCATION – Councillor Yvonne McNeilly 
4.1 Introduction: 
This is my first report since being re-elected in May 2022 and I would
like to say how delighted I am to be returning as a Councillor for Argyll
and Bute and continuing the role of Policy Lead for Education.   
4.2  Education Change Programme – School Leadership Proposals:
Following one of the most ambitious consultation and engagement
exercises, which was undertaken by the Education Service from
November 201 to March 2022, a report on the outcomes and findings
of this process was tabled at the Community Services Committee on
25th August.  Moving forward, a number of key actions were agreed
including:- 
 That the consultation exercise provided valuable feedback from
teachers, pupils and communities;
 That the proposals as consulted on are not progressed;
 That the Education Service, working with Head Teachers, continue
to work across all aspects of the Service to deliver improvement, to
address the implications of national reform, to address the key
issues raised in the consultation and other local and national
challenges the Service is encountering, and will continue to
encounter;
 That the Education Service continues to address the variation in
performance within Argyll and Bute schools and work with Head
Teachers at a local, and with partners at regional level, to improve
outcomes for children and 5 young people. 
I would like to take this opportunity to thank all the officers involved for
their continued hard work and to everyone who took the time to
engage with the process and submit their views.  Moving forward I
hope that we can continue to work with our stakeholders in a positive
Page 58

Page 59

manner, for the benefit of all our children and young people in Argyll
and Bute. 
4.3  Exam Results 2022:
Initial exam results were released by the SQA on 9th August and I am
very proud to report that our young people have achieved impressive
results in what has been another challenging period for them, their
parents/carers and of course all the school staff.  This is this first time
in 3 years that our S4-S6 pupils have been presented for
examinations, with exams in 2020 and 2021 cancelled due to the
Covid-19 pandemic. 
Results show that National 5 attainment remains in line with 2019,
while Higher and Advanced Higher pass rates have increased by 6.3%
and 8% respectively compared to 2019 results. Argyll and Bute pupils’
performances in both Higher and Advanced Higher are above the
national average, while for National 4, a 100% pass rate across all our
schools continues, which is 14% above the national figure. 
Results will be updated by the SQA this month (September) following
the processing of any appeal requests submitted by schools or
candidates. 
Officers have held a number of training sessions with school leaders to
develop a knowledge and understanding of the attainment data for
their school, which has also been further scrutinised to help inform our
Local Authority Stretch Aims across a number of areas. 
4.4  Potential New School for Mull:
As part of phase 3 of the Scottish Government’s Learning Estate
Investment Programme (LEIP) the Council is in the process of
preparing a potential bid for funding for a new campus on Mull.  In line
with the adopted Learning Estate Strategy, Mull has been identified as
a strategic priority for the Council given it is assessed as “C - poor” in
terms of suitability. 
Pre engagement activity has been ongoing with the Mull community in
respect of the potential LEIP bid, with a number of workshops and
meetings held in August to raise awareness and obtain initial views
from key stakeholders. 
A paper is on today’s agenda in respect of the approach and if agreed,
steps will be taken to progress a formal bid for funding by 31st October
2022 deadline. 
Page 59

Page 60

4.5  Dunoon Grammar School - Celebrating Success:
World’s Best School: Dunoon Grammar School (DGS) are in the running
to become the World’s Best School through the T4 Education World’s
Best Schools Award for Community Collaboration. 
The Community Collaboration Prize recognises schools that have
collaborated and developed partnerships with their community to have
an integrated approach in helping each of their students striving for a
whole child approach based on equity and inclusivity. Dunoon has been
shortlisted for its wide range of local, national and international projects,
including: 
 A Covid-19 recovery programme that saw young people in the
school live streaming bingo and other games into care homes.
 Working with local members of the community to design a lasting
monument to those who lost their lives during the pandemic, and
identifying a suitable area to erect it.
 Running events in local primary schools when children could not
attend clubs out with the school during lockdown.
 Designing coded digital solutions to the climate crisis and presenting
them to world leaders at COP26 in Glasgow
 Visiting communities in Malawi, Costa Rico and Ghana to build
education and health facilities. 
I am extremely proud of the school and wish them the very best of luck! 
Gaelic Education Award: As if being one of the world’s top schools
wasn’t enough, DGS have also recently won the Gaelic Education
Award at this year’s Scottish Education Awards held in Glasgow on 8th
June 2022. 
The award recognises early learning and childcare settings and
schools that have developed a positive culture of continuous
improvement in relation to Gaelic Medium and Gaelic Learner
Education. 
4.6 Celebrating Success and Continuous Improvement:
DGS aren’t the only school celebrating success.  I am amazed, but not
surprised, that only a few months into the new school term there is
already an array of awards and achievements to be celebrated right
across our excellent Education Service.  I have detailed below some of
the highlights:- 
Developing Nurturing Cultures: A further ten schools in Argyll and Bute
have achieved accreditation for their achievements in developing
nurturing cultures in their school communities, taking the total to 18.  
Page 60

Page 61

The accreditation is part of the Council’s ‘Our Children, Their Nurturing
Education (OCTNE) Strategy’ and aims to ensure that children and
young people have the emotional support they need. 
The schools that have received bronze accreditation in this round are:
Ardrishaig Primary, Bowmore Primary, Campbeltown Grammar,
Colgrain Primary, Dunoon Primary, Garelochhead Primary, Hermitage
Academy, Rothesay Primary and Sandbank Primary. 
Port Charlotte Primary made an outstanding achievement and
received gold accreditation. 
The health and wellbeing of our children and young people is a key
priority for the Council and the work of the Educational Psychology
Service in supporting schools to implement these approaches has
been fantastic.  This success has been recognised by Education
Scotland who are using the programme as a case study for positive
practice in its national review. 
Gold for Children’s Rights: Ulva and Lochdonhead Primary Schools
have both recently received gold accreditation in UNICEF UK’s Rights
Respecting School Programme.  This is presented to schools that
show commitment to promoting and realising children’s rights and
encouraging adults, children and young people to respect the rights of
others in school.   
Current engagement across Argyll and Bute: 
 45 schools and nurseries in Argyll and Bute are already
engaged with the award
 Two of them are partner providers
 Ten are currently working towards Bronze: Rights
Committed
 23 are working towards Silver: Rights Aware
 Eight are working towards Gold: Rights Respecting
 And four have achieved Gold and are now classed as
Rights Respecting Schools. 
Silver Award for Port Ellen: Port Ellen Primary on Islay has received a
silver award in the Pearson National Teaching Awards for ‘Making a
Difference – Primary School of the Year’. 
The award celebrates excellence in education and recognises the life
changing impact that an inspirational teachers can have on the lives of
the young people they work with.
Page 61

Page 62

Port Ellen received recognition for its commitment to achieving
excellence for all, enabling pupils to flourish in an environment that
values every child, promotes high expectations and provides
opportunities for achievement.  The school has now been shortlisted to
win one of 16 Gold Awards up for grabs later in the year.  Good luck! 
Top Marks for Head Teachers: Three of our Primary Head Teachers
have received top marks following completion of Education Scotland’s
national ‘In Headship’ qualification. I would like to pass on my
congratulations to Linda MacBeath from Rhu, Karen Wheatley from St
Mun’s, and Pauline Walsh from Colgrain for their outstanding results. 
I must also recognise the achievements of five of our aspiring Head
Teachers, who have received the General Teaching Council for
Scotland’s Standard for Headship, following successful completion of
the ‘Into Headship’ qualification:- 
 Shona Guthrie – Lochgilphead Joint Campus
 Caroline Lamond – John Logie Baird on secondment to Early
Years Team
 Roseanne MacKay – Hermitage Academy on secondment to
Central Team
 Leonie McMurdo - Craignish
 Kate Petrie - Bunessan 
Small Isles Primary: Congratulations to Small Isles Primary on
securing their sixth Eco Schools Green Flag Award.  This
demonstrates a huge commitment from teachers and pupils and the
wider school community in delivering environmental benefits across a
range of topics including biodiversity, energy, healthy living, waste and
water. 
Participation Measures: New figures published by Skills Development
Scotland show that 93.9% of young people in Argyll and Bute are
currently in education, employment or training, putting the area in fifth
place out of all 32 Scottish local authorities. 
The Annual Participation Measure reports on the economic and
employment activity of 16-19 year olds in Scotland and is the source of
the Scottish Government’s National Performance indicator. 
This year’s figures show a 0.4% rise in Argyll and Bute compared with
2021 and a jump from 10th to 5th in the national table, illustrating the
commitment and hard work of our young people, their families and all
Page 62

Page 63

staff across the Education Service, in achieving positive destinations
for young people when they leave school. 
4.7  Early Years Team:
Early Years Team – Quality Mark: The Early Years Team have
received the General Teaching Council Scotland’s Quality Mark after
gaining an Excellence in Professional Learning Award from the
organisation. 
A huge well done to the team on receiving this accolade, which is in
recognition of the excellent work that is taking place across early years
establishments across the authority to support and promote
professional learning that has a significant impact on teachers,
classroom practices and our children and young people. 
Childminders: The team have been working closely with the Scottish
Childminding Association (SCMA) and Skills Development Scotland
(SDS) to increase our childminder numbers within specific rural areas,
to support parents to live and work across Argyll and Bute. We are
currently awaiting confirmation of the number of new childminders
enrolled with the Care Inspectorate (CI), however, early indicators
suggest Argyll and Bute have been one of the most successful Local
Authorities within the scheme in relation to numbers recruited. 
Income Generation Pilot: This month, the team are starting an income
generation pilot within Rothesay Joint Campus, using existing staffing
levels to offer paying spaces to parents of non-eligible two year olds,
with the aim of supporting working parents with childcare whilst
maximising use of staffing resource to generate income. We will
gather stakeholder views which will be used to determine whether an
extension of the pilot will be rolled out in the Campbeltown area, where
local intelligence suggests there is also a need for childcare provision
to support working parents and where our current staffing complement
could deliver this at no additional cost. 
4.8  National Writing Project:
Argyll and Bute Council have applied and been chosen as one of the
five authorities accepted to the first national wave of the Children and
Young People’s Improvement Collaborative National Writing Project.
We have five schools participating in the programme which will see
classroom practitioners, supported by school leadership, using a
developed writing bundle for First Level learners. The programme
supports practitioners to use a specific bundle of approaches to writing
and to gather data using the bundle to evidence improvement. 
Page 63

Page 64

4.9  Support for Parent Councils:
The Wellbeing, Rights and Relationships Manager has been working
closely with parent councils to improve support for those who are
involved.  We are supporting this role through CONNECT
membership. CONNECT provide a range of training and resources to
improve parental involvement and engagement.  We are also working
together to agree support information for parent council members, as
well as looking at how we promote the positive contributions parent
councils make to our school communities.  A draft document is
currently being consulted on.  CONNECT will be invited to our Parent
Advisory Group to update members on what they can offer. 
4.10  Summer Holiday Food and Childcare Programme:
As per last year, the Scottish Government rolled out a programme for
Summer Holiday Food and Childcare and tasked local authorities to
deliver a mix of holiday provision making best use of existing cross-
sectoral childcare and organised children’s activities services.  Local
authorities were asked to focus on areas with higher SIMD rating and
support access for the six priority groups highlighted in the Tackling
Child Poverty delivery Plan outlined below: 
85% of funding was intended to be targeted at children and young
people from the priority family groups:  
 Children from lone parent families
 Children from ethnic minority families
 Children from families with a disabled adult or child
 Children from families with a young mother (under 25)
 Children from families with a child under one year old
 Children from larger families (3+ children) 
The remaining 15% of the funding can be used flexibly to reach other
children who would benefit from access to free holiday childcare, food
and activities. 
In line with last year Education took the lead for the Summer Activity
programme for 2022.  Due to the success of last year’s programme
and the feedback from staff and parents, it was agreed that we would
target three weeks of the summer holidays and offer activities and
childcare within hubs across the authority. 
Hubs were established during the weeks of 4th July, 18th July and 1st
August in Campbeltown, Dunoon, Helensburgh, Islay, Lochgilphead,
Oban, Rothesay and Tobermory.  Dates and times varied in each
town. 
Page 64

Page 65

Organising the programme is a huge undertaking and Education had
great support from Customer Support Services who designed a
bespoke booking form which enabled parents to book activities and
gave Education staff the ability to run reports to support registration,
have an overview of booking figures, and supply numbers to catering
staff for lunch provision.  In addition, Commercial Services helped to
deliver 2,550 meals across the eight hubs. 
Support was also received from a wide range of partners and external
organisations who should be recognised for their contributions:- 
After School Clubs
 Tarbert After School Care
 Drumfork
 Escape 
 Fyne Families 
Outdoor Education
 Ardroy
 Scout Scotland
 Go Venture 
Third Sector
 Helensburgh & Lomond Carers
 MAYDS
 Achievement Bute
 Cowal Young Carers
 A&B Council Champs Group
 MacTaggart Community Cyber Café
 Mull & Iona Community Trust 
Others
 Oban Youth Café
 Wee Happy Health Club
 Hope to Oban
 Albatross Arts
 Rangers Football Club 
Feedback on the programme has been collated from staff, partners,
parents/carers and pupils and will be used to inform future
programmes.  Some of the feedback received is detailed below:- 
“It’s a lifeline for my family. I find the holidays really tough and this makes life so
much easier knowing they are happy and my life is easier throughout these
weeks it’s on thank you thank you thank you!!!!” 
“I loved everything.”  “I liked meeting new people.” 
“Providing opportunities for young children that they may not have had.” 
Page 65

Page 66

5. POLICY LEAD FOR ROADS AND TRANSPORT - Councillor Andrew Kain 
5.1  Introduction:
Since May I have been getting familiar with the Roads and Transport
brief and council officers. With Argyll and Bute covering such a large
and diverse area the Roads and Transport services confront
significant challenges in delivering. As well as roads, the service
covers ports and harbours, ferries and airports. There is 2,300 Km
roads (40% on Islands) of varying standards across the second largest
council, by area, in Scotland, and over 4,500km of coast line plus 23
inhabited islands. When these facts alone are considered it is clear
that delivering best value for Argyll and Bute’s communities can
present some significant challenges. 
5.2 Major projects: 
The following are in different stages of delivery and will contribute
hugely in improving the economies and welfare of the communities
they serve. 
Campbeltown flood defences: this is a significant project newly
underway which will greatly reduce the flood risk in the town while
improving the resilience to the changing climate. While there will be
some disruption during construction, all will be made good by the
contractor with significant benefits for the future. There is a useful
page on the Council website providing details about the works. In
summary this project has a value of over £15M with Scottish
Government Flood Prevention Scheme funding 80% and the Council
20%. 
Elected Members have received a presentation relating to the works
and have carried out a site visit to view the various elements of the
proposed works. On the same day a public pop up event was held
which was well attended. The three local councillors have had an
additional workshop session with officers to progress options for the
reinstatement of Burnside Square following the installation of an
underground water storage tank which will occupy much of the
footprint of the square. A public consultation exercise will be carried
out to seek the views of communities regarding the reinstatement
options. 
Flood Prevention Study Work: The Campbeltown scheme is the first
scheme that this council has received physical works funding for with
flood study and design works having been carried out over a number
of years. We are also currently undertaking flood study works under a
similar programme for Rothesay and Oban. These flood studies will be
Page 66

Page 67

used for bids for future flood prevention schemes as the availability of
external funding allows. 
Ardbeg Sea Wall Isle of Bute In December last year a significant storm
washed away the sea wall exposing utility services within the footway
and putting at risk the public road and private land beyond. Quick
temporary action was taken to provide a temporary wall to protect the
road and utility services. These reactive works were carried out under
emergency ‘powers’. Permanent works are currently being designed
and permissions sought as required with planned works. It is intended
that a permanent solution will commence construction in 2024.
However, it is worthy of note how vulnerable our infrastructure can be
particularly in adverse weather events. 
Ardbeg sea wall defences. 
Home to School Transport and Public Transport – the Council
transports some 3,000 school children between home, school and
back every working day, the logistics behind this operation is
significant. The majority of school transport is carried out by bus and
mini bus. There are also a number of children who travel by train
(mainly to Oban High School and Helensburgh Academy). Some of
these train journeys have been disrupted due to industrial action in the
rail sector. Service cancelations have been combatted by the
introduction of bus services. 
Page 67

Page 68

Roads Reconstruction Programme – The Council agreed a £8M
investment for this financial year’s roads reconstruction programme
and a further £958K has been secured following a competitive bid to
the external Strategic Timber Transport Fund. This coupled with some
£500k for footways and an additional £300k for street lighting will
deliver a significant programme of asset sustainability works across
the public road and footway network. 
Typical roads reconstruction works under way. 
Oban Harbour: This is a hugely significant programme that will greatly
benefit the economies of Oban, island communities and aquaculture
businesses across Argyll and Bute. The move to establish Oban as a
Municipal Harbour is close to being delivered and the Council has
engaged with over 1,000 stakeholders thus far. I have engaged with
members of OCDHA who are fully behind the development, indeed
their attention to detail benefits greatly the process. That said the
complexity and enormous number of moving parts make it impossible
to satisfy every view. However, the unifying objective remains to
deliver a ‘Harbour Revision Order’ to Transport Scotland by the end of
year for Ministers to formally consider the proposals to create a
Municipal Harbour Authority. We then move on to the next phase
where, with the help of OCDHA and other stakeholders, we can
ensure the effective management and success of Oban Municipal
Harbour. The Council is also looking at options for extending the North
pier to deliver greater capacity. 
Bridge and Structure Funding: Following a successful bid for external
government funding to upgrade a number of bridges and structures,
design work is underway for 15 bridges and structures which meet the
funding criteria and were part of a competitive bid which was
successful in securing over £5M of additional funding. Construction
work will be carried out over the years 2022 – 2025, allowing for
detailed design, consents and permissions to be completed. This
Page 68

Page 69

funding will see significant upgrades to key transport infrastructure
assets. 
Winter cover: The service has in place a winter service policy as
delivered in previous years with the objectives of ensuring the
provision of a standard treatment appropriate to the prevailing weather
conditions and; establishing patterns of working which will produce the
greatest benefit from the deployed resources, with the view to
reducing the level of risk and the extent of any delays to the public,
caused by adverse weather conditions. The service will be rolling out
its winter plans as normal over the coming period and will use both
roadside weather stations and a professional external forecast suppler
to determine daily treatments. 
Page 69

Page 70

Preparation/calibration of a typical winter vehicle roadside weather
station and typical forecast 
Ports and Ferries: The Council is responsible for a number of ferries
and ferry routes along with 34 piers and ports. The Council has
previously pursued transfer of its internal ferry operations to Transport
Scotland. 
On a national basis, Transport Scotland is currently reviewing how
services are delivered and looking at the best solution for delivery of
future services in line with Islands plan. The service will continue to
play its part in contributing to those vital transport links. 
Electric vehicles and EV Charging Points: the Council has significantly
increased the number of small vehicles which are either electric or
hybrid over the last two years and will continue to capitalise on grant
funding to add further EV charging points. 
Page 70

Page 71

Qualifying Factors: The current economic environment is not
something that will be consequence-free for Argyll and Bute and the
service. The inflationary pressures across the board will impact all
aspects and create significant cost increases. The cost of all materials
is rocketing! However, the service is doing what it can to mitigate the
effects through activities such as combining with other authorities to
improve purchasing power, route optimisation, and everything in its
power to maintain effectiveness with greatly reduced resources. 
Future: It is my intention to continue familiarisation with projects within
brief and further developing relations with officers as we jointly look to
develop policy and maximise resource delivery for the benefit of all
residents of Argyll and Bute. I am always happy to have further
discussions with colleagues who may have issues or suggestions
about mitigating pressures. We are anticipating policy changes form
Scottish Government on both urban 20 mph zones and footway
parking. Officers will bring papers to the relevant committees and/or
briefing notes in due course when more information is available. 
6. POLICY LEAD FOR CARE SERVICES – Councillor Amanda Hampsey
6.1 Introduction:
I was appointed to the role of Policy Lead for Care Services at the
Council meeting on 19th May. Since taking on the role, I have worked
closely to build relationships with the various heads of service and
care providers, to gain a broader insight into the provisions provided
within Argyll and Bute. Below is an overview to some of the activities in
which have taken place. 
Page 71

Page 72

6.2 Key Meetings:
On 4th July, I met with Fiona Davies, Chief Officer of the HSCP and
Professor Jason Leitch, National Clinical Director to make visits to
Oban, Lorn and The Isles Hospital, Eader Glinn Care Home, Lorn
Medical Centre and Healthy Options, Oban. Tribute was paid to the
staff for the exemplary continued commitment to patients. The
opportunity was also taken to discuss with each member of staff what
challenges they have faced, given the difficult circumstances in which
our health care workers have been under during the pandemic and
whilst our National Health Service has gently eased away from
restrictions. Feedback from staff was incredibly positive. 
On 19th August, I travelled to the Isle of Bute to meet with Fiona
Davies, Chief Officer of the HSCP and Humsa Yousaf MSP to attend
Bute General Hospital, Bute Medical Practice, Thomson Court Care
Home and The Lade Centre. Again, much appreciation was shown to
the staff for the excellent level of care provided and they were highly
commended for the unity and teamwork shown within partnerships. 
6.3 Mental Health and Inpatient Care:
Succoth Ward in Mid Argyll Hospital is currently operating 17 beds.
Occupancy has been running consistently at 95%.   
The team continues to be supported by bank and agency staff.
However, the ward continues to facilitate student nurse placements
and recruitment is ongoing. In responding to the challenges of
recruitment the team have recently been successful in their application
to the Scottish Terms and Conditions Committee to apply a
Recruitment and Retention Premium to their band 5 posts. It is hoped
that this will help stabilise the workforce by boosting recruitment efforts
and minimising staff turnover. 
The Mental Welfare Commission visited the ward in June of this year.
The report is in the process of being finalised and is likely to be
published by the Commission in the coming weeks. 
6.4 Community Mental Health Teams (CMHTs):
CMHTs continue to function in each of our four localities and have
close links with our inpatient service, General Practitioners, Addictions
Service and acute and community hospital services. The effective
function of these teams is crucial to support people to remain in the
community and to facilitate timely discharge from hospital. 
The new national Suicide Prevention Strategy is scheduled for
publication by the Scottish Government week beginning 26th
September 2022. The Argyll and Bute multi-agency Suicide Prevention
Page 72

Page 73

Group comprised a range of key stakeholders from across Argyll and
Bute. 
6.5 Primary Care Mental Health Service Team (PCMHT):
We have a single PCMHT that has practitioners based within and
supporting, each of the four locality areas. The function of this team is
to support a range of mental health conditions such as mild depression
and anxiety. 
We have recently commissioned Support in Mind Scotland to deliver
Distress Brief Interventions for the people of Argyll and Bute and our
initial focus has been on awareness raising and training our partner
agencies, i.e. SAS, Police Scotland, Scottish Fire and Rescue, Local
Authority and General Practitioners to be able to refer to this service. 
This work is in line with the national program details of which can be
accessed via the attached link. 
6.6 Perinatal Mental Health Service:
Our new Perinatal Mental Health Service is progressing well. The
service has an Advanced Nurse Practitioner (ANP) and an Infant
Therapist.   
The ANP, who is managed within Mental Health services, has
developed care pathways and supports a caseload across Argyll and
Bute. She has forged good links with the specialist Mother and Baby
unit in Glasgow.  This has contributed to improved clinical supervision
and communication between the teams and better outcomes for
patients and families.   
The Infant Therapist is governed under integrated children’s services.
She has undertaken a training needs analysis within children’s
services.   
We have two Nursery Nurses associated with the project and they
have undertaken some preparation work to deliver an
antenatal/postnatal group. They have undertaken training with Peep
and the Solihull Programme and are linking closely with
the Perinatal Team.  They also plan to visit the Mother and Baby Unit
at Leverndale to develop their knowledge and skills and learn from the
specialist work that goes on there.   
Patient and family engagement is a key strand of this work and a
number of initiatives have commenced in relation to this.  Practitioners
from Lets Grow Kids are taking forward collaborative approaches from
book bugs to attending soft play groups and developing surveys with
Page 73

Page 74

QR codes in an attempt to gather more anonymised feedback and to
engage the voice of those with lived experience. 
6.7 Learning Disabilities: 
Argyll and Bute’s integrated Learning Disability Services continue to
provide support to approximately 377 people with either a Learning
Disability or Autism via a range of services. 
Phase 1 of the redesign of day care services is now complete and we
are about to embark on phase 2 which focuses on our delivery
models. Phase 1 focused on the reorganisation of our staffing
structures and recruitment in relation to this has been very successful.   
Work is also ongoing to review and expand our local core and cluster
models in line with national policy (Coming Home Report). 
In February 2021 the Scottish Government allocated a £20 million
Community Living Change Fund to Integration Authorities via NHS
Boards to:
 Reduce the delayed discharges of people with complex needs.
 Repatriate those people inappropriately placed outside of
Scotland.
 Redesign the way services are provided for people with
complex needs. 
As part of the response to council on action taken the HSCP has utilised
the allocation of £300,701 in the following way. The two key intentions
are to use this money to:
 Employ a project manager on a fixed term contract for 18 months to
review the care and support needs and arrangements of the 33
individuals who have been placed out with Argyll and Bute and to
develop local pathways to support as many of these individuals as
possible to return home.  
 Support staff to undertake Positive Behaviour Support Qualifications and
become PBS Champions. 
Recruitment to the Project Manager post is underway. 
6.8      Neurodevelopmental Conditions: 
There is awareness of the lack of a robust infrastructure locally to provide
assessment, treatment and support for those with neurodevelopmental
conditions.  There is an emerging trend nationally within Boards and
Authorities to develop a Neurodevelopmental Pathway which is a
specialist service responsible for the assessment of neurodevelopmental
conditions such as Autism Spectrum Disorder (ASD) and Attention Deficit
Hyperactivity Disorder (ADHD). 
Page 74

Page 75

A business case is currently being to support the development of a
Neurodevelopmental Pathway for Argyll and Bute. Officers have
undertaken some horizon scanning to see what models and processes
that other areas have produced and this work will shape proposals going
forward.     
6.9        Clinical Care and Governance (C&CG):
A review of the C&CG framework is being finalised, in support of
partnership and integrated practice. The review is in its final stages and
has been co-produced with professional Leads, Heads of Service and
Clinical Care and Governance Committee members. The final Framework
is expected by the end of September. 
6.10        Care Homes: 
A submission was compiled for the Scottish Government on Care Home
sustainability and resilience given financial concerns around the sector.
Locally day to day issues are managed through the care home assurance
process. 
Strategically the Care Homes and Housing Programme Board (under
transformation) has completed an initial, independent architect’s review of
internal care homes and this needs to join with capacity planning and
business cases for the future. 
6.11  Right Care, Right Time (Unscheduled Care):
This is the main programme that reviews all unplanned care and in
effect is a system wide approach across hospitals, community, acute
that tries to avoid admission to hospital and support at home. The
Chief Officer now chairs the Programme Board across Highland. 
6.12  Adult Social Work: 
Work continues to support the sustainability of Adult Social Work
services reflecting national shortages of social workers. Work is
progressing to redesign with Social Work Team Leaders to give
assurance to the Chief Social Work Officer. 
6.13  Care At Home:
Work is also continuing to support the sustainability of Care at Home
services. This currently operates on a mixed economy of internal and
commissioned services. A strategic approach is being taken to
addressing this in the particular geography of Argyll and Bute. 
Page 75

Page 76

6.14  Response function and island approaches
The response function for uninjured falls was successfully remodelled
and funded for mainland areas. We are increasing focus for equity to
develop such responses within island communities. This links with
approaches with Coll and emerging discussions on Mull in terms of
health and social care needs. 
6.15  PLANNING, PERFORMANCE AND TECHNOLOGY
WEST OF SCOTLAND REGIONAL HEALTH AND SOCIAL CARE
DELIVERY PLAN - 2022/23
The service work plan updates were presented to the Board in August
noting the following areas of progress to regional service
implementation and development this year:
 Major Trauma centre - Phased implementation of model for
provision of hyper acute specialist rehabilitation.
 Vascular Services Programme - Deliver vascular centre at
University Hospital Hairmyres (UHH).
 Cancer Multi-Disciplinary Teams (MDT) - Roll out MDT FIT
Improvement Programme across all MDTs in the region, building
on learning from pilot.
 Ophthalmology Services overview report highlighting risks,
issues and potential solutions required. The report will have a
particular focus on glaucoma and diabetic retinopathy – March 23.
 Urology - Conclude the business case for robotic partial
nephrectomy to inform funding decision by WoS NHS Boards for
2023/24.
 Interventional Radiology - Conclude the development of the
Regional Interventional Radiology Service Model / Medical Model
Proposal. Determine the regional support for this proposal and the
implications for services/ Boards of the changes to provision –
December 22. 
6.16  Planning and Performance 
The service is supporting and leading a number of streams of work
including:
 Developing and implementing the new Integrated Performance
Management Framework for the IJB by March 2023.
 Service reviews including future service model for Isle of Coll,
Outpatient service redesign using the “Near Me” video conference
service and digital appointing and service redesign. Supporting the
Primary Care Mental Health Well-being plan, Highland Hospice
remote advise support to clinicians. Agreeing pathway and service
delivery redesign in ENT and Ophthalmology with NHSGG&C.
 Utilising SGHD waiting times initiative funding to boost service
capacity, redesign processes and services to reduce waiting times
in services as presented at the IJB in August 2022. 
Page 76

Page 77

 Preparing the production of the IJB annual performance report
2021/22 presentation to IJB November 2022.
 Progressing the implementation of the HSCP Commissioning and
Market Facilitation plan, report on partner co-production workshop
June 2022 – “Think Home First” changing the hospital journey.
 The HSCP has been successful in obtaining grant funding of
£465,000 to install up to 30 additional electric charge points to
support the transition of the NHS fleet to zero emissions by 2025. 
6.17 Technology:
A key aspect of integration of health and social care services is the
development of a person-centred approach and a single health and
care team. A single information system and ideally a shared record
has been identified by front line staff as key operational requirement to
achieve this from the inception of the HSCP.   
The HSCP Digital Modernisation Strategy and action plan captures
this aim and details how this will be achieved. The Strategy has now
been approved and included in the HSCP Strategic plan 2022-2025.
The following outlies the current status of some of the projects.
 Implementation of the ECLIPSE system replacing Carefirst for
social work and community nursing and community AHP health
services go live date from January 2023.
 Implementation of Orion Portal allowing primary care and hospital
systems to view ECLIPSE community health record from January
2023.
 Scanning of all general health medical records at LIH Oban, 80%
complete, commencing the scanning of such records in Mid Argyll
and Cowal Community Hospital from October 2022.
 Federation of Microsoft teams and 365 e-mail between Council and
NHS Highland to improve speed of communication via providing
calendar sharing (free/busy, video, voice and message) by October
2022. The HSCP with Argyll and Bute Council and NHS Highland
are participating/leading this national project rolled out to the rest of
Scotland before winter. 
The HSCP recent Digital Modernisation newsletter provides further
information on the projects and programmes in place. 
Page 77

Page 78

7. POLICY LEAD FOR PLANNING AND REGULATORY SERVICES –
Councillor Kieron Green 
7.1  Introduction:
This first report of my activities as Policy Lead for Planning and
Regulatory Services covers from the election in May until August
2022. I would like to thank officers for their introductory briefing
meetings in the numerous areas covered by this remit including
Development Management, Development Planning, Building
Standards, Regulatory Services and Biodiversity. 
The Planning, Protective Services and Licensing Committee has
continued to meet on a monthly basis, and the Licensing Board met in
June and August. Additionally a number of Local Review Bodies have
been convened, along with Community Council Conduct Review
Panels and Appeals Committees as required. I have also attended the
Clyde Regional Marine Planning Partnership which encompasses the
eastern coastline of Argyll and Bute. 
7.2  Development Management:
2,071 applications were submitted for 2021/22, higher than the pre-
pandemic figure of 1,984 in 2019/20. First Quarter 2022/23
submissions are at similar levels to that seen last year. 
Planning fee income received in the First Quarter 2022/23 was £76k
above that forecast, with further increases to come from monies yet to
be received for major developments and three Section 36/37
consultations. 
Planning Performance Framework 11, covering the period 2021/22
was submitted to the Scottish Government in advance of their deadline
of 7th September 2022, with the finalised report coming before
committee this month. 
7.3  Development Policy:
Reporters were appointed to conduct the examination of the Local
Development Plan 2 in May. Most site visits have now been completed
and the process is anticipated to be completed by December 2022. 
Officers continue to engage with partners around developments at
Dunbeg, and work is progressing on the Oban Strategic Development
Framework as resources permit. 
7.4  Building Standards:
Income levels are £94k above forecast including that received from
high value applications and through commercialisation. 98.7% of
Page 78

Page 79

Building Warrant applications are being responded to within 20 days
and 97.3% of Warrants and Amendments are being issued within six
days of satisfactory information being received. I am delighted that the
team has been reaccredited for the Customer Services Excellence
(CSE) award covering 23 criteria, up from 19 previously. 
At the Local Authority Building Standards Scotland (LABSS) Congress
on Friday 16th September, Argyll and Bute Council received the
Scottish Award for Outstanding Service and Commitment for
Customer Focus. This is excellent news and recognises the very high
standard and dedication shown by the team in delivering the Building
Standards service across Argyll and Bute. This achievement is very
well deserved and highlights that the team’s contributions are
recognised by peers at a national level. Congratulations and very well
done to the whole team. 
7.5  Regulatory Services:
Permanent signage advising of dangers of Blue-Green Algae has
been installed at the higher risk Lochs - Avich, Awe, Eck, Nell and
Lomond. Where blooms are reported in other lochs temporary notices
are posted. 
Avian Influenza has been closely monitored with the Council following
UK Government Department for Environment, Food and Rural Affairs
guidance in responding to this. Officers have contacted commercial
poultry businesses to discuss the situation and their arrangements and
contributed to the Scottish working group on this. 
Ukrainian resettlement program property checks for the UK and
Scottish Government Super-sponsor schemes ensure homes are
suitable and safe. To minimise the impact on individual services,
inspectors are being resourced from housing associations, and fire
and rescue, together with environmental health, housing and estates
staff. 
7.6  Staffing:
Efforts to recruit to vacant posts across a number of areas continue,
with recognition that until these are filled there will be an ongoing
impact on service performance. As a result there is a growing backlog
of planning applications with fewer being determined than are being
validated. 
7.7  Biodiversity:
New projects are commencing to restore peatland on Islay, following
previous work at Achnacree Moss near Connel. This is being funded
from Peatland Action and will also help address climate change.
Page 79

Page 80

Buglife B-Lines, which seeks to create a network of linked wildflower
rich areas across Scotland has been completed for now within Argyll
and Bute. Work by the Islay Natural History Trust covering Islay and
Jura has now been linked to this national project. 
There has been officer contribution to the consultation for the Scottish
Biodiversity Strategy and associated Delivery Plan. These are
establishing measures to have achieved by 2030 and 2045 in relation
to restoring native habitats, managing ecosystems, increasing health
and resilience of species, and providing carbon sequestration. 
8. POLICY LEAD FOR CLIMATE CHANGE AND ENVIRONMENT
SERVICES - Councillor Ross Moreland   
8.1 Introduction: Following the elections held in May and the formation of
the new Council, I have been appointed as the Policy Lead for Climate
Change and Environment Services, which covers a range of Council
Services.  These range from waste management and amenity services
to climate matters.   
I had my first meeting with officers to discuss my role as Policy Lead in
July, and continue to have monthly meetings where officers provide
wide-ranging updates on matters within my remit.   
8.2 Waste Management: 
 The Council moved to a three-weekly general waste collection and
two-weekly recycling service in 2016. This service delivery model was
implemented to contribute towards increased recycling and also to
make a financial saving. 
 Collections take place from 48,000 households – with 18 bins lifted
each minute of every working day. Overall, staff lift just short of three
million bins per year across 236 collection routes.
 3,386 commercial contracts are in place, and commercial collections
are offered for general waste, recycling and glass. A number of
commercial organisations offer commercial waste services in addition
to the Council.
 11 Civic Amenity and 98 Bring Sites are available across the council
area.
 Across Argyll and Bute there are three waste disposal models in place:
Islands Model; Mainland PPP Contract; and Helensburgh and Lomond
Model.  
 The Biodegradable Municipal Waste (BMW) landfill ban comes into
force from December 2025. To deal with this the Council have in place
a Waste Strategy and currently an Options Appraisal is being
produced which will contribute towards a recommended solution for
Page 80

Page 81

waste disposal.  A report will be presented to the Environment,
Development and Infrastructure Committee in December 2022,
detailing the full appraisal and proposed next steps.  Officers will also
be arranging an Elected Members seminar prior to the December
Committee, which I would encourage Members to attend.    
8.3  Grounds Maintenance:
 Grounds maintenance, including street cleansing operate to
predetermined schedules with some reactive work being carried out to
respond to issues such as fly tipping and removal of animal carcases
form the local road network.  
 Scheduled spring and summer works have been carried out across all
areas, grass cutting, weed killing etc.  The bedding of plants has
commenced where applicable. 
 Grounds staff are often deployed to cut roadside verges which is an
activity carried out in the main for road safety reasons.  
 The council is also the litter authority for the trunk road (otherwise
managed by Transport Scotland) under the Environmental Protection
Act.
 The Council has 31 play parks across the area.  The Scottish
Government have awarded around £150k for improvements, which
officers are reviewing in terms of implementing improvement works,
and working alongside colleagues in Procurement. A further report is
scheduled for the December ED&I Committee. 
8.4  Electric Vehicle Charging (EVC): 
 Good progress has been made with the Council’s EVC Strategy.
Charging has been in place for over a year now. In terms of public
use, this continues to increase. 
 The future installation/expansion plan – specific sites and high level
criteria – has been to public consultation.  The main headline from the
consultation is that 75% of those responding support the expansion
strategy.  
 The Scottish Government has published a draft vision for EVC
development which, among other things, includes a number of options
for local authorities to consider in their own expansion plans, from a
concession model to public private partnership to local authority-only
plans. Officers are currently analysing these different models and how
they would or could apply in Argyll and Bute.  A further report on EVC
will be presented to the Environment, Development and Infrastructure
Committee in December 2022. 
Page 81

Page 82

8.5  Climate Change: 
 Addressing Climate Change is a global issue that is hugely reliant on
partnership, collaboration and the actions of us all. No single
organisation can tackle it in isolation and as a Council we need to
show clear leadership and lead by example in all that we do. 
 Officers provided two comprehensive reports to August Policy and
Resources Committee on the Council’s Carbon Emissions and Climate
Investment, and the Decarbonisation Plan  Policy and Resources
Committee - Climate Change Update
 It is encouraging to see that there is a downward trend across the
Council in terms of our annual carbon emissions footprint.  The most
recent national statistics show we have reduced our footprint by a third
over the past six years, which is fantastic, but there is no room for
compliancy or de-acceleration.  Officers monitor this activity and all
departments across the Council, including us as Elected Members,
have a responsibility to play in monitoring and reducing our carbon
emissions.  
 The relative sources of emissions by activity have remained fairly
consistent for several years with processing municipal waste being
responsible for around half of the entire emissions. Whilst overall all
emission sources have reduced the proportions have remained
relatively consistent. Future projects like Biodegradable Municipal
Waste (BMW) Landfill Ban, switching to greener ways heat and power
buildings and fleet replacement with low emissions vehicles will
obviously have a significant impact on overall carbon footprint.
 The Council’s Decarbonisation Plan was adopted in 2021 to support
and align to the ‘green recovery’ from the pandemic and much
progress has been made to delivering climate commitments.  The De-
carbonisation Plan sets a three-year framework to continue our climate
journey and routemap to net zero.  
 As Policy Lead with responsibility for Climate Change, I will be joining
the Council’s Climate Change Board.  The Board is chaired by the
Head of Commercial Services, and has representations from services
across the Council, looking at how the Council will meet its obligations
by 2045.  
 Both Audit Scotland and our own Internal Audit team reviewed
activities and actions relating to climate chance in August 2022 and
there was a ‘high level of assurance’ identified in terms of compliance
with relevant statutory obligations and Acts.
 Officers are continuing to work with partners of the Community
Planning Partnership and other Public Bodies in terms of producing a
regional Adaptation Plan and scientific based net zero routemap.     
Page 82

Page 83

8.6  Campbeltown Site Visit on 31st August: 
Campbeltown Flood Prevention Scheme spans across the Policy Lead
areas for Roads and Transportation and Environment and Climate
Change. On 31st August the Policy Leads and local members met with
the delivery team consisting of council officers, contractor Dawson
WAM and consultant AECOM. 
The scheme has a total value of over £15M, 80% of which is funded
by Scottish Government and 20% by the Council.   
We will take forward a number of different pieces of work to address
the various causes of flooding in the town. The overall project is in five
parts (the order these will be taken forward is being finalised).   
9. POLICY LEAD FOR ISLANDS AND BUSINESS DEVELOPMENT-
Councillor Liz McCabe   
9.1 Introduction: 
This is my initial Policy Lead Report since being appointed to the role
of Policy Lead for Islands and Business Development. Since taking on
this role myself and Deputy Lead Councillor Graham Hardie, have met
with the Executive Director, together with the Head of Economic
Growth and Regeneration Projects Manager to discuss all key service
areas within my remit and to gain a further understanding of the
current priorities and challenges.  We meet every six weeks and they
are available should I require any information during that time. 
Page 83

Page 84

9.2  Islands: 
The Scottish Government (SG) has introduced the Islands (Scotland)
Act 2018 and the National Islands Plan (NIP), which identifies 13
strategic objectives for action. In addition, the National Islands Plan
Implementation Route Map 2020 – 2025 has also been developed,
These documents set out how the Scottish Government (SG), local
authorities and other public agencies will work together to improve
outcomes for our island communities. As a consequence the Council
has been required to provide additional officer resources to ensure
engagement and collaboration with the SG, specifically the Islands
team, to ensure that we maximise the opportunities for our islands
from the NIP and NIP Route map as well as from the associated SG
Islands budget that will be available until 2025. Officers sit on the SG
National Islands Plan Delivery Group and feed into and work with the
SG Islands team and across the council. 
One of the SG Islands budget streams is specifically available to
Scotland’s six local authorities with islands. Please see below Islands
Infrastructure fund 2021/22 which was provided directly to the local
authority based on population and road length. On 17th December
2021, the SG confirmed Argyll and Bute Council’s share of the funding
was £740,000. The grant had to be drawn down before the end of
March 2022. Grant contracts for ten community based projects were
issued to enable drawdown of funding and officers are now working
with them to draw down the individual grants. 
Islands Programme 2022/23 – This year, rather than a direct
allocation, the SG advised that it would be via a competitive process.
The four bids listed below were the strongest and were submitted, and
decisions on these are expected imminently. 
1. Island Airports Resilience and Sustainability project – Coll and
Colonsay - £300,000 IP grant request. This represents 100% of the
costs.
2.  Island Community Halls Digital Hubs – Islay, Iona, Tiree and Coll -
£100,000 IP grant request. This represents 100% of the costs. 
3.  Tobermory Seawall and Railings project - £250,000 IP grant
request. Total project costs is £450,000, remaining £200,000 being
requested from PBI and CE 2022/23 allocation
4.  Kerrera Road project - £357,577.32 IP grant request. Total project
cost £557,577.32, £200,000 match from previous CE award. Total
IP Grant request £1,007,577.32 
Following the announcement that Islay was to be one of six Carbon
Neutral Islands projects, officers are working with the Scottish
Page 84

Page 85

Government to understand what this means, what will be the next
steps and associated timelines as well as resources.  
9.3  CARS/THI Programmes:  
Rothesay THI:
THI work in Rothesay has been running for three years now and is due
to end in March 2023.  It has been a great success with many
properties benefiting.  At the moment work is ongoing on a large
building in Tower Street.   
Following on from Rothesay THI (2011-2016), Rothesay TH is the
largest of the four programmes, and is due to complete on 31st March
2023, by which date the combined investment made to the town centre
of Rothesay will be £7m. Rothesay TH is funded by National Lottery
Heritage Fund, Historic Environment Scotland, Argyll and Bute Council
(£300k), Highlands and Islands Enterprise, Smarter Choices Smarter
Places and LEADER. Work is ongoing to see the comprehensive
repair of the final priority building at 69-71 Victoria Street, which is
category C listed and in need of substantial repair. 
Dunoon CARS:
Dunoon CARS is a £2m programme, due to complete on 31st March
2023. Dunoon CARS is funded by HES and the council (£500k). Work
is out to tender for the final priority building at 106-110 Argyll Street
and hoping to start works on site in September 2022. 
Lochgilphead CARS:
Lochgilphead CARS is a £1.8m programme in its third year. It is
funded by HES, the council (£400k) and Private Sector Housing Grant
(£186k). Work is ongoing to commence the first priority building to site
whilst other projects are being developed 
Helensburgh CARS: 
Helensburgh CARS is a £2.4m programme in its second year. This
scheme is funded by HES, the council (£327k) and Private Sector
Housing Grant (£173k). Work is ongoing to progress priority buildings,
small repairs grants and shop front grants – two shop front grants
have been applied for – training events have also taken place with one
being planned for end September 2022. 
In addition to the towns above the council has also delivered CARS
Projects in Campbeltown and Inveraray.  An expression of interest has
been submitted to the New Heritage and Place Programme (which will
be replacing CARS) for Tarbert. 
Page 85

Page 86

CARS grants have helped to safeguard existing businesses, and new
businesses have opened as a consequence of the regeneration,
helping to create jobs within the community. Such investment has, and
continues to change the physical appearance of our key town centres
for the better, making them more attractive places in which to live,
work, learn and do business. 
9.4  CHARTS (Culture, Heritage and Arts Network for Argyll and Bute)
CHARTS have successfully recruited a part time Gaelic Culture
Heritage and Arts Officer to input into delivery of CHARTS projects.
CHARTS were also successful in their £40K application to the SG
Rural and Islands Futures Division to grow creative networks on island
communities by supporting youth opportunities and entrepreneurship.
Creative individuals and organisations will be encouraged to develop
new initiatives such as heritage trails and to develop innovative visitor
experiences. A series of opportunities will also offer learning
experiences for young people. The programme will include digital
events featuring experts that will encourage the pooling of resources
and knowledge. 
As part of the project, a new Islands Officer role will be created and is
now open for applications. This new post on the CHARTS staff team
will consult arts and heritage practitioners and voluntary groups to
promote and support development for island communities, with the
aim of increasing interest in the region's valued island culture. 
9.5  Film and Creative Industries: 
Creative industries play a strategic role in Argyll and Bute’s Economic
Strategy. The outcome is ‘to raise our profile as a centre for cultural
activity and create a vibrant and sustainable creative sector.’ This
includes the distribution of a strategic events and festivals budget
subject to available resources. Further to the last update the Policy
and Resources Committee approved seven applications from across
the area namely: Tiree Music Festival, Bute Noir, Argyllshire Gathering
Sea Change, Powering Women in Film, Oban Winter Festival, Tarbert
Music Festival and Helensburgh Festival of Lights. The Royal Mod
which takes place in Oban in 2025 is also funded through this grants
programme. 
The Development and Economic Growth service has been providing a
service to the screen industries since 1998 when the film service was
initially part of the Scottish Highlands and Islands Film Commission.
Core to the service is providing confidential advice and support as a
“one stop shop” to the industry through a single point of contact within
the Economic Development section. The “one stop shop” supports the
production’s needs in many ways including, liaising with other council
Page 86

Page 87

departments (for road closures, access to land/property including car
parks etc.), providing locations to film enquiries, land ownership
queries, local knowledge and connecting productions to local services
such as Gaelic speakers and community groups. July alone saw ten
enquiries and seven productions filming across the area. 
9.6  Business Gateway: 
COVID-19 Response: Two new business support schemes were
launched on 19th May 2022 using the Local Authority COVID
Economic Recovery funding, administered by the Business Gateway
team. 
The Small Business Development Grant 2022 provides grants to
existing businesses of up to £3,000 (75% of eligible costs). As of 9th
June 2022, five applications have been received - two were approved,
one rejected and two pending decision. 
The Business Start-up Grant 2022 provides grants to new start
businesses of up to £3,000 (paid in 3 instalments). As of 9th June, two
applications have been received: one was approved, one pending
decision. Officers are working with colleagues in Projects and
Regeneration to design an uplift to the above schemes, to provide
additional support in areas of greatest need. This will be piloted in
Campbeltown, Dunoon and Bute. 
Uptake of both new funds using the Local Authority COVID Economic
Recovery Fund money has been good following promotion in June. As
of 17th August, 50% of the Start-up grant allocation has been
committed (20 grants approved) and 29% of the Development grant
allocation (21 grants approved). At this rate, both funds will be fully
committed in advance of year-end. 
The pilot LACER Top-up is now live and a process agreed for referrals
to the Projects and Regeneration team for this, for clients with
premises in Campbeltown, Dunoon, Bute and mid Argyll. 
Business Gateway Local Growth Accelerator Programme (LGAP): The
Scottish Government approved a request to extend delivery of the
programme to March 2023, with the final claim due by September
2023. 
Key stats for Business Gateway’s first quarter: 
 162 enquiries handled
 145 Business Advisor meetings (by phone or email)
 124 existing businesses supported
Page 87

Page 88

 27 new start-ups supported
 18 one-hour specialist advice sessions delivered
 103 attendees from Argyll and Bute at national webinars
 Rolling 12-month customer satisfaction rates at 92% compared
to national level of 82% 
9.7 Employability Team Activity:
Fair Start Scotland:  (for 16 to 67-year-olds) - 13 additional starts have
signed up to Fair Start Scotland, bringing the total to 302 participants
since the service commenced (67 Helensburgh, 72 Campbeltown, 34
Rothesay, 49 Dunoon and 80 Oban). 
Argyll and Bute Employer Recruitment and Training Incentive
(ABERTI): (for 16 to 67 year olds) - Applications for this fund ceased at
31st March. A total of 37 participants and 28 employers were
supported. To date 29 participants have completed the 52-week
programme and this has funded a total of 91 people into work. 58 of
these job starts have occurred during the COVID-19 period. 
No One Left Behind - Employer Recruitment Incentives (ERIs) 25+
Years: Applications are now invited in respect of the ERIs of up to
£6,000 per person. This allows unemployed people aged 25 and over
the opportunity to move into permanent or a fixed term employment
contracts of up to 18 months or more. This funding has attracted two
employers who have recruited one employee each utilising this
funding. A further eight places remain. Our Employer Engagement
Worker continues to promote this funding. 
Given the success of the Young Person’s Guarantee pre-employability
support programme delivered by three of our Local Employability
Partners, we have extended this support to include 46 No One Left
Behind participants aged 25 and over.  Up to 30th June 2022 a total of
23 participants aged over-25 have been supported. Of these, one is in
employment and the rest continue to receive support. Partners have
encountered a lack of referrals in this age group. 
Parental Employability Support Fund (PESF) - Employer Recruitment
Incentives (ERIs) 25+ Years: Applications are now invited in respect of
the ERIs of up to £6,000 per person. This allows unemployed people
aged 25 and over the opportunity to move into permanent or a fixed
term employment contracts of up to 18 months or more. To date no
one has accessed this funding, the one place previously reserved did
not proceed as planned. All ten places remain available, our PESF
Engagement Workers continue to promote this funding to parents they
support. 
Page 88

Page 89

9.8  Digital: 
The £463m Digital Scotland Superfast Broadband (DSSB) programme
has connected over 950,600 premises to fibre broadband – over
110,000 premises more than originally anticipated. 95% of premises
across Scotland are now able to access fibre broadband – up from just
59% in 2014. 
Due to the rurality of Argyll and Bute and the dispersed population we
are the fourth lowest of Scotland’s 32 local authorities. It has always
been the Scottish Government’s aim to provide every premise in
Scotland with access to Superfast Broadband (SFB) so the Reaching
100% (R100) was developed and supported by a £600M commitment
to connect the final 5%. Scotland was split into three procurement lots
- South, Central and North. Most of Argyll and Bute is in the North Lot
with most of Helensburgh and Lomond in the Central Lot. 
Across Argyll and Bute there are 8,625 premises in the main contract
with a further 4,016 eligible for SBVS, however a number of the
premises not in scope may be connected as a result of “overspill” or
commercial deployment. All of these 8,625 premises are to get a Fibre
to the Premise (FTTP). This is true fibre broadband. Over the next few
years people will be migrated from a FTTC connection to an FTTP
connection as it becomes available. 
Current stats:
 93.7% Argyll and Bute premises connected to the fibre network
 85.2% can access speeds >30Mbps 
 0.8% are between 24 and 30 Mbps 
 2.6% are between 15 and 24 Mbps 
 1.9% are between 10 and 15Mbps 
 6.2% are between 2 and 10Mbps 
 3.4% are below 2Mbps 
 Full Fibre availability is currently at 4.2%             
10. CONCLUSION 
10.1 This report provides members with an update on each of the Policy
Lead portfolios. Policy Lead Councillors will be happy to discuss any
particular issues with colleagues as required. 
Argyll and Bute Council – Policy Lead Councillors Report – 21st September
2022 
For further information please contact Aileen McNicol, Leadership Support
and Member Services Manager, telephone 01546 604014 or email
aileen.mcnicol@argyll-bute.gov.uk
Page 89

Page 90

This page is intentionally left blank

Page 91

ARGYLL AND BUTE COUNCIL  COUNCIL   
29th September 2022 
POLITICAL MANAGEMENT ARRANGEMENTS 
1. INTRODUCTION 
1.1 Councillor John McAlpine, who represented Ward 2, Kintyre and the Islands,
very sadly passed away on Monday 18th July 2022. His passing results in a
number of vacant positions within the council, on its committees and various
external organisations to which Cllr McAlpine was appointed by the Council. 
1.2 Councillor Ross Moreland, who was appointed as the council’s
representative on KIMO (Kommuners International Kiljorganisation) has
indicated that he no longer intends to take up the appointment. 
1.3 Councillor Graham Hardie, who was nominated as one of the council’s two
representatives to the Loch Lomond and the Trossachs National Park
Authority Board, has advised that he is no longer able to take up this
appointment. 
1.4 The council is invited to consider what action it wishes to take in light of the
above vacancies. 
2. RECOMMENDATIONS 
2.1 The council is invited to consider what action it wishes to take in light of the
vacancies on council committees and external organisations arising from the
sad passing of Councillor John McAlpine. A full list of these appointments is
set out at paragraphs 3.1, 3.2 and 3.3. 
2.2 The Council is asked to appoint one representative to KIMO (Kommuners
International Kiljorganisation).   
2.3 The Council is asked to nominate one representative to the Loch Lomond and
the Trossachs National Park Authority Board, noting that final appointments
to this body are determined by Scottish ministers. 
Page 91 Agenda Item 7

Page 92

3. DETAIL   
3.1 Council Roles   
Councillor John McAlpine was appointed to the following council roles at
the first meeting of the council on 19th May 2022: 
a) Policy Lead for Community Planning and Corporate Services
b) Depute Policy Lead for Economy and Rural Growth 
c) Chair of the Mid Argyll, Kintyre and the Islands Area Committee 
3.2 Committee Vacancies
As a result of Councillor McAlpine’s sad passing, there are now vacancies
on the following council committees: 
a) Policy and Resources Committee
b) Environment, Development and Infrastructure Committee
c) Argyll and Bute Harbour Board 
d) Employee Joint Consultative Committee
e) Local Negotiating Committee for Teachers 
3.3 Appointments to External Organisations
Councillor McAlpine had been appointed as a council representative to the
following external organisations: 
a) Live Argyll Board (external organisation)
b) West of Scotland European Forum (statutory body - main
representative) 
3.4 Area Committee Appointments
As one of the three councillors elected to represent Ward 2, Kintyre and
the Islands, Councillor McAlpine was appointed to Islay and Jura
Community Enterprise Ltd at the Mid Argyll, Kintyre and the Islands Area
Committee meeting on 8th June 2022. This note is provided for the
council’s information only, with no action required at this stage, as this
appointment is one of those made at Area Committee level, and is likely to
be picked up at the next appropriate Area Committee meeting following
the Ward 2 by-election on 29th September 2022. 
3.5  KIMO (Kommuners International Kiljorganisation) 
KIMO campaigns on marine pollution issues affecting coastal
communities, exchanging information on effective public pollution, clean-
up operations and sustainable development. It has 128 members from ten
European communities and lobbies national governments, the European
Commission and others to take effective actions on issues affecting
northern seas. 
Page 92

Page 93

KIMO in the UK is co-ordinated by Shetland Islands Council, which has
requested that member councils appoint one representative each for the
2022 to 2027 local government term. 
Councillor Ross Moreland, who was initially appointed at the meeting of
the Council on 30th June 2022, has indicated that he no longer intends to
take up the appointment and there is therefore an opportunity to make an
alternative appointment.   
3.6 Loch Lomond and the Trossachs National Park Authority Board 
The Council is entitled to nominate two members to the Loch Lomond and
the Trossachs National Park Authority Board, and at least one must be a
local member – either living in, or representing a ward within, the National
Park. Membership of the Board is a Scottish Government appointment
and any new appointments are subject to ministerial approval. 
Councillor Graham Hardie, who was nominated for one position at the
meeting of the Council on 19th May 2022, has advised that he is no longer
able to take up this appointment. 
The Council is invited to make an alternative nomination which will be
submitted to Scottish ministers for approval and, subsequently,
appointment to the Board. 
4. CONCLUSION 
4.1 This report outlines a number of vacancies both within the council and on
external organisations arising from the sad death of Councillor John
McAlpine. It also notes the request to make an appointment to KIMO
(Kommuners International Kiljorganisation) and the requirement to make a
new nomination for appointment to the Loch Lomond and the Trossachs
National Park Authority Board, with final appointment to that body subject
to ministerial approval. 
5. IMPLICATIONS 
5.1  Policy – Appointments to outside organisations are in keeping with the
Council’s commitment to working in partnership with other agencies to
benefit the people and communities of Argyll and Bute.   
5.2 Financial – The Council will incur costs arising from Elected Members’
participation in some meetings, except where the body has its own
allowances scheme. 
Page 93

Page 94

5.3 Legal – None 
5.4 HR – None 
5.5 Fairer Scotland Duty - None 
5.5.1 Equalities - protected characteristics – None 
5.5.2 Socio-Economic Duty - None 
5.5.3 Islands - None 
5.6 Climate Change - Participation in KIMO provides an opportunity for the
council to participate in a wider environmental discussion forum and share
ideas/good practice. 
5.7 Risk – None 
5.8 Customer Service – None 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support   
4th August 2022 
For further information please contact Aileen McNicol, Leadership Support and
Member Services Manager, on 01546 604014 or by email on
aileen.mcnicol@argyll-bute.gov.uk 
Page 94

Page 95

ARGYLL AND BUTE COUNCIL  COUNCIL
LEGAL AND REGULATORY SUPPORT 29 SEPTEMBER 2022 
COUNCIL CONSTITUTION REVIEW 
1.0 INTRODUCTION 
1.1  This report presents the annual review of the Council Constitution 
for Members consideration and agreement. 
2.0 RECOMMENDATIONS 
2.1 The Council is invited to agree to the adjustments to the Constitution
as set out in Appendix 1.
3.0 DETAIL 
3.1 The proposed changes to the constitution are driven generally by 
incorporating updates in respect of decisions previously agreed by 
Council since the last review, updated terminology and changes in
legislation and operation that require to be reflected in the constitution.
These proposed changes are set out in Appendix 1.
3.2 In addition to the annual review amendments to the Constitution will be 
considered in the event of any potential alterations to operational and 
procedural requirements.
4.0 CONCLUSION 
4.1 The proposed changes will address issues arising since the last 
revision in September 2021. 
4.2 Council is recommended to agree the adjustments to the Constitution 
as outlined in Appendix 1 to ensure the Constitution remains up-to- 
date and facilitates the operation of regulatory functions.
5.0 IMPLICATIONS
5.1 Policy – These revisions will keep the Constitution up to date.
5.2 Financial - None
5.3 Legal - None
5.4 HR - None
Page 95 Agenda Item 8

Page 96

5.5 Fairer Scotland Duty - None
5.5.1 Equalities – protected characteristics – The provisions have no adverse
impact in terms of equality issues and have the potential to enhance
accessibility in respect of remote participation proposals.
5.5.2 Socio-economic Duty - None
5.5.3 Islands - None
5.6 Risk - None
5.7 Customer Service - None 
Douglas Hendry - Executive Director with responsibility for Legal and
Regulatory Support
Policy Lead - 
1 September 2022 
For further information contact: David Logan, Head of Legal and Regulatory
Support, Kilmory, Lochgilphead Tel: 01546 604322 
APPENDICES
Appendix 1: Review of Constitution 2022 – Summary of Key Changes 
Page 96

Page 97

Review of Contract Standing Orders 2022 – Summary of Key Changes        Appendix 1                                                                                                        
Reference – Current Constitution Part
A
Reference – Current Constitution Part
B - Standing Orders for Meetings
Reference – Current Constitution Part
C - Scheme of Delegation
Reference – Current Constitution Part
D - Financial and Security Regulations
Reference – Current Constitution Part
E (1) Contract Standing Orders - page
& paragraph detail version October
2021 
Reference – Current Constitution Part
F - Ethical Framework 
Proposed amendment
Part C
Scheme of
Delegation
Page 64
2 .1.5 (4)
Area Committees 
Delete this paragraph to align with the powers of the
Council and the delegations to directors 
Part C
Scheme of
Delegation
Page 71 
Para 2.5.3 (a)
PPSL 
Amend this paragraph to enable the PPSL to determine
applications which have been subject to a pre-
determination hearing  for 
(1) a major development which would be a significant
departure from the development plan; or (2) a
National development
to align with alteration in legislation removing
requirement for these to be determined by Full Council. 
Part C
Scheme of
Delegation
Page 78
2.8.1 
Appeals committees 
Delete this paragraph to align with ACAS guidance to
allow for single appeal stage 
Part C
Scheme of
Delegation
Page 82 para 3.2.9 General delegations to Officers 
Delete this paragraph to align with the powers of the
Council and the delegations to directors 
EXECUTIVE DIRECTOR with Responsibility for Legal and
Regulatory Support and Commercial Services 
Delegations will be reviewed to update language to reflect
statutory updates and rearrange order as appropriate. 
Add at appropriate section
of delegations 
1. To approve Market Value disposals, acquisitions,
leases, sub-leases, assignations, licences,
variations, extensions, rent reviews and
agreements (including rent free periods) for
property both from and to the council.
2. To approve less than Market Value disposals,
acquisitions, leases, sub-leases, assignations,
licences, variations, extensions, rent reviews and
agreements (including rent free periods) where the
reduction is equated with works / contributions /
community benefit being made by the tenant; or
where the Market Value is restricted by conditions
within the agreement; and in any case in regard to
disposals, only in the case where the best
consideration that can be reasonably obtained is
Page 97

Page 98

These have already been
agreed by PPSL 
less than the threshold or marginal amounts as set
out in the Local Gov (Sc) Act 1973 and consequent
regulation.
3. To enter into wayleaves, servitudes and leases
with statutory bodies and other providers of utility
services who require rights over property for a
particular purpose.
4. To terminate leases sub-leases, licences and
agreements and take appropriate action to regain
or surrender possession of the property. To allow
the surrender of leases where a business intends
to expand into larger council premises or where a
business runs into trading difficulties. 
5. To maintain and update list of wheelchair
accessible vehicles  for licensed taxis and private
hire cars within the Council’s area for the purposed 
of section 165 of the Equality Act 2010 and to
consider and determine where medical evidence
has been produced applications for exemptions
from drivers’ duties under section 165 of the
Equality Act 2010 
6. in consultation with the Chair and Vice Chair of the
PPSL Committee, to immediately suspend a
licence in terms of paragraph 12(1) of Schedule 1
of the Civic Government (Scotland) Act 1982 if
they determine that the circumstances of the case
justify immediate suspension, on the grounds of
undue public nuisance or a threat to public order or
public safety. 
Part C
Scheme of
Delegation
Page 83
Add delegation where
appropriate
Chief Executive 
To make arrangements to fulfil the Council’s duties in
terms of the Counter Terrorism Act 2015 and to nominate
and appoint officers to any required role or function in
that regard. 
Part C
Scheme of
Delegation
Page 84
1
Remove reference to sections 40 and 223
Part C
Scheme of
Delegation
Page 84
3
Split into two separate paragraphs to read: 
To determine applications for  charitable collections
under  section 119 of the Civic Government (Scotland)
Act where no objections are received 
To determine applications for  public processions under 
section 63  of the Civic Government (Scotland) Act where
no objections are received 
Part C
Scheme of
Delegation
Page 84
4
Amend to read: 
To maintain a panel of representatives for appointment in
connection with the interests of any child in connection
with any proceedings before the Sheriff, in terms of the
Curator ad Litem and Reporting Officers
(Panels)(Scotland) Regulations, and to determine fees in
accordance with Council policies. 
Part C
Scheme of
Delegation
P85
5
Remove reference to section 19
Part C Page 85  Remove ‘s 1976 and’
Page 98

Page 99

Scheme of
Delegation
7
Part C
Scheme of
Delegation
Page 86
18
Remove
Part C
Scheme of
Delegation 
Page 87
29
Amend Paragraph to read: 
To undertake all building maintenance work within
approved expenditure either by directly employed staff
direct labour or by the use of maintenance contractors
subject to the provisions of the Contract Standing Orders. 
Part C
Scheme of
Delegation
Page 87
39 
Amend Preliminary, Extent and Application, Clause 1.1.4
to read: 
To carry out the functions of the Council as Education
Authority in relation to the provision of education for
children or young people with additional support needs in
terms of the Education (Additional Support for Learning)
Scotland Act 2004. 
Part C
Scheme of
Delegation
Page 88
47
Replace the Children (Performances) Regulations 1968
with the Children (Performances and Activities)
(Scotland) Regulations 2014 
Part C
Scheme of
Delegation 
Page 89
55
Insert ‘and  School Education (Amendment) (Scotland)
Act 2OO2’ after Scotland’s Schools Act 2000  
Part C
Scheme of
Delegation 
Page 90
67
Remove ‘Community Learning and Development’ 
Part C
Scheme of
Delegation
Page 91
(c) Insert ‘The Chief Officer of Health and Social Care is
authorised, in accordance with any policy approved
by the Council –‘ below CHIEF OFFICER –
HEALTH AND SOCIAL CARE 
Part C
Scheme of
Delegation
Page 91
1
Amend to read: 
To act as, or manage a suitably qualified officer as,
Chief Social Work Officer, in terms of Section 3 of
the Social Work (Scotland) Act 1968, for the
purposes of the Council’s functions under the:
(a) Social Work (Scotland) Act 1968; 
(b) The enactments in Section 5(1B) of the same
Act; 
(c) The Adults with Incapacity (Scotland) Act 2000;
and 
(d) Duties or powers bestowed upon a Chief Social
Work Officer under any other Act or regulation
enacted from time to time by the UK or Scottish
Parliament. 
Part C
Scheme of
Delegation
Page 91
1(i)
Immediately below amended paragraph 1, but before sub
paragraph (i) insert 
To designate the Chief Social Work Officer to act as
the proper Officer, in accordance with any policy
approved by the council: 
Page 99

Page 100

Amend subparagraph (i) to read: 
To promote social welfare by making available
advice, guidance and assistance under Section 12 of
the 1968 Act, on such a scale as may be appropriate
for its area. The delegation in terms of this Section
shall include authority:
(a) to make loans or grants to any person or
family;
(b) to give any other appropriate assistance,
including provision for the storage of property
in cases of emergency. 
Part C
Scheme of
Delegation
Page 91
1(ii)
Amend to read: 
To assist in the disposal of produce of work undertaken
by persons in need under Section 13 of the 1968 Act.
Part C
Scheme of
Delegation
Page 91
1(iii)
Amend to read: 
To provide care at home and laundry facilities for persons
in need, etc. under Section 14 of the 1968 Act. subject to
the recovery by the Executive Director on the appropriate
scale as may be determined by the Council; but subject
also to the Executive Director being empowered to abate
or waive care at home/home help charges to avoid
hardship according to the personal and financial
circumstances of the client.
Part C
Scheme of
Delegation
Page 91
1(iv)
Amend to read: 
To receive and keep in care in certain circumstances any
child in need under Section 17 and 25 of the 1995 Act.
Part C
Scheme of
Delegation
Page 92
1(v)
Amend to read: 
To make an application for a permanence order in
respect of a child under Section 80 of the Adoption and
Children (Scotland) Act 2007.
Part C
Scheme of
Delegation
Page 92
1(vi)
To ensure that, in reaching any decision relating to a child
in the care of the Council, consideration is given to
Section 17 of the 1995 Act.
Part C
Scheme of
Delegation
Page 92
1(vii)
Amend to read: 
To provide accommodation for a looked after/care
experienced child in certain circumstances, under
Section 25 of the 1995 Act.
Part C
Scheme of
Delegation
Page 92
1(viii)
Amend to read: 
To provide accommodation under Section 26 of the 1995
Act for a child looked after by the Council and to remove
any child from a residential establishment under Section
32.
Part C
Scheme of
Delegation
Page 92
1(ix)
Amend to read: 
To grant financial assistance to persons who meet the
criteria set out in Section 30 of the 1995 Act, to enable
them to meet expenses in connection with their
accommodation, maintenance, education or training, in
accordance with Section 30.
Part C
Scheme of
Delegation
Page 92
1(x)
Amend to read: 
To provide aftercare under Section 29 of the 1995 Act in
respect of any child who meets the criteria therein.
Page 100

Page 101

Part C
Scheme of
Delegation
Page 92
1(xi)
Amend to read: 
To make arrangements for the burial or cremation
of any person where the criteria under Section 87 of
the Burial and Cremation (Scotland) Act 2016 are
met, The Council may recover expenses incurred
under this section from the estate of the deceased. 
Part C
Scheme of
Delegation
Page 93
1(xii)
Amend to read:
To pay the expenses incurred in attending a funeral
where the criteria set out in Section 88 of the Burial
and Cremation (Scotland) Act 2016 are met. 
Part C
Scheme of
Delegation
Page 93
1(xiii)
Amend to read: 
To give effect to a compulsory supervision order made by
a Children’s Hearing for its area under Section 144 of the
Children’s Hearing (Scotland) Act 2011.
Part C
Scheme of
Delegation
Page 93
1(xiv)
Replace ‘supervision requirement’ with ‘compulsory
supervision order’
Part C
Scheme of
Delegation
Page 93
1(xv)
Amend to read: 
To seek review by a Children’s Hearing of a compulsory
supervision order, in certain circumstances, under Section
131 of the Children’s Hearings (Scotland) Act 2011. 
Part C
Scheme of
Delegation
Page 93
1(xvi)
Remove ‘in accordance with the policies of the council’
Part C
Scheme of
Delegation
Page 93
1(xvii)
Replace ‘furniture’ with ‘property’
Part C
Scheme of
Delegation
Page 93
1(xviii)
Insert ‘s. 32 of’ after ‘in terms of’
Part C
Scheme of
Delegation
Page 93
1(xix)
Replace ‘handicapped persons’ with ‘disabled persons’
and remove ‘and in accordance with the policies of the
Council’ 
Part C
Scheme of
Delegation
Page 93
1(xxi)
Remove ‘as Care Authority’
Part C
Scheme of
Delegation
Page 94
1(xxiv)
Remove ‘in accordance with Council policies’
Part C
Scheme of
Delegation
Page 94
1(xxvii)
Amend to read: 
To authorise the Chief Officer – Health and Social Care
to make direct payments in terms of the Social Care
(Self-directed Support)(Scotland) Act 2013 and any
further provisions made by the Scottish Ministers in terms
of s. 15 of that Act to an eligible supported person for the
purpose of enabling the person to arrange for the
provision of support by any person. 
Part C
Scheme of
Delegation
Page 94
2
Insert ‘, in accordance with any policy approved by the
Council’ before ‘in relation to the Council’s functions’ 
Part C
Scheme of
Delegation
Page 94
2(ii)
Replace with Criminal Procedure (Scotland) Act 1995  s.
42
Page 101

Page 102

Part C
Scheme of
Delegation
Page 94
2(vii)
Replace with Sections 51 and 217  of the Criminal
Procedure (Scotland) Act 1995 and s. 14 of the Criminal
Justice and Licensing (Scotland) Act 2010 
Part C
Scheme of
Delegation
Page 94
2(x)
Remove 
Page 96 Para L10 Executive Director with responsibility for Development
and Economic Growth 
Delegations will be reviewed to update language to
reflect statutory updates and rearrange order as
appropriate. 
Para L10 is modified to include an exception to the
requirement to PPSL determination where a Submission
under S75A relates to either:
(i) A planning obligation which has become
obsolete either by means of being related to an
expired and unimplemented planning
permission; or 
(ii) where the terms of planning the obligation can
be demonstrated to have been met in full and
where there is no longer term requirement (i.e.
road safety, site restoration, ongoing
management of land) for the burden on the
land being retained. 
Page 97 para L22 (a)11 
Delete the word “no” where it appears to correct
typographical error 
Part E
The
Constitution
Contract
Standing
Orders 
Page 177 prior to the
heading “ Preliminary”
insert new Section headed
“Definitions “
To add the following DEFINITIONS 
“Authorised Signatory” means an authorised signatory of
the Council in terms of the Contract Standing Orders as
more particularly described in the Authorised Signatories
for Contracts List 
“Category Manager” means the manager of a particular
category of contract for the categories Corporate &
Education; Construction & Environment and Care &
Housing ; 
“Contract Owner” means an officer from the Relevant
Service who is responsible for the management of the
Contract 
Call-Off Contract’ means the terms and conditions under
which specific purchases can be made under a
Framework Agreement and/or a DPS and/or an
arrangement established in terms of the light touch
regime 
‘DPS’ means a dynamic purchasing system as defined in
the European Procurement Regulations; 
‘Framework Agreement’ means an agreement which sets
out terms and conditions under which specific purchases
(Call-Off Contracts) can be made throughout the term of
the agreement 
‘Portal” means the national portal established and
maintained by Scottish Procurement for the purpose of
Page 102

Page 103

publicising: (i) the seeking of offers, and (ii) the award of
contracts, which may be found at
http://www.publiccontractsscotland.gov.uk. 
“Procurement Manual” means the Council’s procurement
manual which sets out the procurement processes,
templates and guidance which the Council requires to
utilise when carrying out a public procurement. 
‘Procurement Process’ means a procurement process
approved by the Council’s Procurement Board and/or set
out in the Procurement Manual in relation to the conduct
of a procurement exercise 
‘Procurement Regulations’ means the Public Contracts
(Scotland) Regulations 2015, the Procurement (Scotland)
Regulations 2016, the Procurement Reform ( Scotland )
Act 2014 or such other Regulations as may be in force
from time to time 
Regulated Procurement’ has the meaning defined in the
Reform Act and mmeans contracts of or over £50k in
value excluding VAT for goods and services and £ 2m for
works ( excluding  VAT  let by public sector 
‘Reform Act’ means the Procurement Reform (Scotland)
Act 2014 and any new legislation amending, substituting
or replacing that Act 
"Relevant Service" means the service department of the
Council with the particular operational requirement in any
individual case for supplies, services or works on behalf
of the Council (or for the disposal of surplus materials). 
“SGN” means Supplementary Guidance Note forming
part of the Procurement Manual 
“SPPNs” means Scottish Public Policy Notes issued by
the Scottish Government 
Part E 
The
Constitution 
Page 177 after the
heading PRELIMINARY at
para 1 add new Headings
“General “ and
“Compliance with “General
Principles” and “Scots
Law” and “Extent”  at
consecutive paragraphs
1.1.;1.2 , 1.3 and 1.4 
Amendment to add new headings added for ease of
reference and Preliminaries amended  to include the
extent of the application of the standing orders 
Part E
The
Constitution 
Page 177
At para 1.7 add new
heading “ Procurement
Manual “ 
Add new heading for  Procurement Manual for ease of
reference and paragraph revised  to include provision for
reference to Supplementary Guidance Notes ( SGNs )
which form part of the Procurement Manual 
Part E
The
Constitution 
Page 178 add new paras
1.8  headed Compliance
with Procurement Strategy 
And 1.9 ( and following
1.9.1 and 1.9.2 ) new para
headed Compliance with
Sustainable  Procurement
Duty 
Amendment to include reference to The Procurement
Strategy  &  reference to Sustainable Procurement Duty
and Fair Work Practices 
Page 103

Page 104

Part E
The
Constitution
Page 178 add new para
1.10 headed “ Internal
Arrangements “ 
Amendment to clarify compliance with standing orders,
scheme of delegation, procedures and financial
regulations 
Part E
The
Constitution
Page 178 at para 2.1  Amendment of Section headed Contract Register
expanded to reflect obligation to maintain and publish the
Contract Register
Part E
The
Constitution
Page 178 add new paras
3.1 and 3.2 “ Regulatory
Thresholds “ and “Local
Thresholds “ 
Amendment provides clarity on the relevant thresholds
for compliance with these standing orders and the
procurement regulations. 
Part E
The
Constitution 
Page 178 above  para 3.3
add new heading general
heading “Public Contracts”
and new para 3.6
standardised processes 
and new 3.7   headed
“Community Benefits” 
New headings for ease of reference and new para 3.6
cross refers to the guidance and templates supplemental
to the Procurement Manual and new para 3.7  to ensure
compliance with the Procurement Reform Act on
community benefits
Part E
The
Constitution 
Page 179   add new
headings at 4. “Contract
Management “ and sub
heading “ Form of
Contract” and new sub
heading and paragraph at
4.2 “Signing “ 
Amendment  to provide clarity on scheme of delegation
for authorised signatories
Part E
The
Constitution 
Page 179 new 4.3 headed
Contract Modification  and
new sections under the
same heading 4.4/
4.5/4.5.1
Amendment to make the Contract Standing Orders
consistent with the Procurement Regulations and
processes/templates for managing change during the life
of a contract; requirements to have a written variation
signed per the scheme of delegation and obligations to
include variations in Contract Register to record
variations/modifications 
Part E
The
Constitution
Page 179 new para 4.6
heading “Termination of
Contract “ and 4.7  
Amendment to make the Contract Standing Orders
consistent with the processes/templates for termination
of contracts to manage the risk of early termination and
provide an audit trail of decision making and recording in
the Contract Register 
Part E
The
Constitution 
Page 179 new para 4.8 “
Best Value “ 
Amendment to reflect obligations from the Local
Government Scotland Act 2003 and the Procurement
Reform Act
Part E
The
Constitution 
Page 179 new para 4.9 &
4.10 “Guidance Notes- 
SGNs and SPPNS”
Amendment to clarify that when entering a contract
officers must  have due regard to Scottish Government (
SG) Guidance   to include  any Guidance issued by the
Manager of PCCMT approved by Head of Legal and
Regulatory Support– the SG from time to time issue
policy notes which are in turn approved and issued via
the Procurement Board and this is to ensure our
processes reflect all current and relevant guidance and
national best practice 
Part E
The
Constitution 
Page 179 renumber
current para 4 as 5
headed add new heading
CONTRACT TERMS 
Amendment to add additional headings for ease of
reference 
Part E
The
Constitution 
Page 179 at para 5.4
Indemnities and Contract
Security 
Amendment to Indemnities clause  :clarifications added
and expanded sub para 5.4.5 to clarify levels and
types  of indemnity required for Council contracts  and to
clarify requirements for security on any contract can
include parent company guarantee or performance bond 
Page 104

Page 105

Part E
The
Constitution
Page 180 – Specification
and Standards has been
re-numbered from par 7.1-
7.3 and is no 5.5-5.7
See below ** Content remains the same
Part E
The
Constitution
At page 181 after new
“prevention of fraud” 
subheading section 5.8
add new heading
“Contract Payment and
Other Provisions “ at para
5.9 
Amendment to include a section which clarifies that The
Council’s agreed credit period is thirty (30) days.  And
that payment of valid undisputed invoices will be made
by the Council within thirty (30) days of the date of the
invoice issued on or after delivery of the Goods or
performance of the Service. The Contractors are to
include  a similar clause is included in any sub contract
or any sub-sub contract
Part E
The
Constitution
Formerly number 9 on
page 181 – Engagement
of Consultants is now re-
numbered as clause 6 –
appearing after equal
opportunity in employment
- equalities
See below ** Content remains the same
Part E
The
Constitution
Throughout Standing
Orders
Numbering of existing clauses changed where required
to correspond to proposed new clauses and headings  **
Part E 
The
Constitution 
Throughout the Contract
Standing Orders
Substitute the Standing Orders to these Standing Orders
Part F (3)
Ethical
Framework
Employee Code of
Conduct
The code of conduct has been revised to ensure that
they are fit for purpose or have been enhanced with
additional guidance or information where needed. This
will ensure that it is clearer to employees what is
expected of them and what behaviour may constitute a
breach. This will also ensure that when it comes to
considering whether behaviour has fallen short of the
Employee Code of Conduct during a grievance or
disciplinary investigation that the Council has reduced
the risk of any ambiguity regarding these issues. The
detail can be reviewed in the amended Employee Code
of Conduct included at Appendix 2 where revisals have
been highlighted.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 2 
Amendment to contents page to reflect the re-ordering
and addition of the sections.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 3
Addition of “The Council’s Code of Conduct is one of the
ways we put the Council’s values into practice.  It is built
around the recognition that everything we do in
connection with our work at the Council will be measured
against these standards of conduct.  Our commitment to
these high standards helps us to recruit and retain great
people and provide great public services” in 1.0.2
reordered to 1.2
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 3
Reorder of 1.0.2 “This Code sets out the minimum
standards of conduct that are expected of you as an
Argyll and Bute Council employee.  These standards are
the benchmark against which your behaviour will be
assessed in the event of a complaint being made” moved
to 1.4
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 3
Reordered 1.0.3 to be 1.3 and wording amended to read
“The code’s purpose is to provide clear and helpful
advice to employees on the standards of behaviour
expected of them to avoid any breach of the Code of
Conduct”.  Section 1.0.3  “The Code does not affect your
rights and responsibilities under the law” moved to 1.5. 
Addition of “It is important to use good judgement in
Page 105

Page 106

everything you do and to ask for help if you are ever
unsure about the right course of action.” In 1.5.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 3
Section 1.0.4 amended to read “There are a number of
Council wide and service level policies and procedures
which provide more detail on expected practice and
conduct.  Council Wide policies are referred to at the end
of this document” and moved to section 1.6.  Addition of
“The Code is intended to complement all of these
requirements and does not replace them” 
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 3
1.0.5 reordered to 1.8 
1.0.6 reordered to 1. 7 
1.0.7 reordered to 1.8
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 5
Section “The Local Government Ombudsman will use the
National Code as a benchmark of good practice where a
complaint of maladministration has been made” moved to
section 1.9 
Section “The Council also has a Scheme of Delegation to
Officials and Scheme of Proper Officer Appointments to
ensure that the business of the Council is conducted with
the law and proper standards, that money is safeguarded
and properly accounted for and is used in such a way as
to secure and demonstrate Best Value” is moved to
section 1.10
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 5
Addition of extract from Disciplinary Procedures and
Code of Practice outlining behaviours that may be
considered misconduct and gross misconduct (sections
3.2 – 3.4)
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 5
Section 3.2 - reordered to section 8 
Addition of Section 8.1 Employees, Workers and others
outlining standards of behaviour expected. 
Removal of Section 3.2.1.1 “You may have contact with
members of the public as users of services, clients or
citizens.  You should always be courteous and helpful. 
You should deal fairly, equitably and consistently with
each member of the public, and you must follow the
Council’s Equality and Diversity Policy” 
Addition of Section 8.3 Pupils, Students and Service
Users outlining the standards of behaviour expected. 
Addition of Section 8.4.3 under Elected Members “You
must not approach Councillors on employment matters
and Councillors via their own code should decline to
discuss such issues.  Employment maters should be
raised with either your line manager, Human Resources
or your Trade Union representative”
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 5
Section 3.3 – reordered to section 19 
Addition of sections 19.1 – 19.2.4 which outlines more
detail on employee responsibilities in relation to illegal
and prescription drugs.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 6 
Section 3.4 – reordered to section 5 
Addition of 5.1 “If you are charged or convicted of any
criminal offence you must inform your Executive Director
immediately” 
Page 106

Page 107

Addition of 5.4 “See also section – Recruitment & Other
employment matters for information on Criminal
Convictions and their impact on recruitment decisions”
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 6
Section 3.5 – reordered to section 11 
Addition of sections 11.1 – 11.3 as extracts from the Anti
Fraud Strategy. 
Removal of 3.5.1 “The Council can offer advice and
support to any employee who is experiencing difficult in
making payments or with general debt issues. 
Employees’ requiring support should contact their line
manager in the first instance.  The employee Assistance
Programme can also provide advice on debt” 
Section 3.5.3 moved to section 20
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 6
Section 3.6 – reordered to section 6 
Addition of bullet point under section 6.3 “Political
symbols, offensive images or messages/slogans must
not be worn or displayed”
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 7
Section 3.6.3 – reordered to section 8.5 
Section 3.7.2 & 3 moved to Section 4 
Removal of section 3.7.1 “As a Council employee you
must not allow any private interest to influence your
decisions at work and you must not use your position to
further your own interests or the interests of others who
do not have a right o benefit under the Council’s
policies.” 
Addition of Sections 8.5.1 – 8.5.6 Contractors Suppliers
Relationships. 
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 7
Section 3.7 – reordered to section 4 
Addition of 4.3 “You must ensure that where a direct or
indirect interest and/or conflict arises, you declare your
interest to your line manager and consider with your
manager whether you will withdraw from any subsequent
discussion on the issue in question” 
Addition of 4.4 “During the hours of service required my
your employment you must devote your whole time and
energies to your Council duties.  With regard to you
Council employment you are not permitted to receive any
financial payment of benefit not specified in your
contractual terms”
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 8
Section 3.8 – reordered to section 12 
Addition of section 12.3 “During the course of your work,
you are likely to have access to information that is
sensitive, private and confidential.  You must recognise
the importance of confidentiality.  Unless required by law;
you must not disclose information concerning any
member of staff, councillor, service user or customer’s
private affairs to any person not employed by the Council
and/or to any person not reasonably entitled to know. 
You must first obtain express consent from the individual
and/or their guardian and/or the relevant line manager
explaining your reasons for the disclosure.  It is a breach
Page 107

Page 108

of trust to use confidential information for personal
advantage or the advantage of anyone you know” 
Addition of Section 12.4 “You must not pass on any
confidential knowledge or information you may have
gained during your work with the Council” 
Addition of Section 12.9 “All confidential information and
equipment you hold due to your employment must be
returned to the Council before the end of your
employment, or if that employment ends without notice,
immediately after its end”/
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 9
Section 3.9 – reordered to section 16.5 
Addition of 16.5.2 “If your line manager agrees this is
appropriate written approval should be obtained and sent
to HR”. 
Addition of 16.5.3 “For Executive Managers/Directors
written permission must be sought form the Chief
Executive.  The Chief Executive must seek
advice/guidance from the Leader of the Council before
undertaking additional paid employment” 
Addition of 16.5.5 – 16.5. 8 details the arrangements for
sickness absence when working two posts and clarifies
that voluntary work does not apply.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 10
Section 3.10 – reordered to section 7 
Removed 3.10.2 “do not accept any gift, hospitality or
service from anyone which would, or might, place you
under obligation.” 
Removed 3.10.3 “you must follow these rules for
declaring offers of gifts or hospitality and follow the
current procedures for having any offers authorised by
seeking agreement of your Head of Service or Executive
Director.  Where you view the value of the offer to be
more than a token, consult with your line manager.” 
Removed 3.10.4 “All offers with an estimated value of
more than £25 should be registered whether accepted or
not which creates a record of the offer having been made
and what response was given”
3.10.7 moved to section 11.5 
Addition 7.2 – “If you are given a gift or offer of hospitality
or service which are unable to accept then you must
politely explain your requirement to adhere to the code” 
Addition 7.4 “You should not accept repeated hospitality
or frequent personal gifts from the same person or
organisation” 
Addition 7.5 “All cash or monetary gifts must be
respectfully refused, explaining your requirement to
adhere to this Code.,  If the individual insists then
alternatives may be suggested such as charitable
donations” 
Addition 7.6 “If you know or suspect that you may be a
beneficiary of a service user’s will, you must notify your
line manager and advice must be sought from
Governance and Law.  The same applies if you are
Page 108

Page 109

approached to be a witness or executor of a service
user’s will” 
Addition 7.8  “If through the course of your work you
require to arrange or host a hospitality event you must
follow these same principles and the event must be
proportionate to the circumstances and be mindful of
value for money principles” 
Addition 7.9 “When attending hospitality events you must
remember that you are there as an ambassador of the
Council and conduct yourself appropriately”
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 10
Section 3.11 – reordered to section 15 
Addition of sections 15.2 regarding use and safe keeping
of council equipment; 15.3 on use of council internet and
email services and 15.4 on use of personal mobile
phones during working time. 
Addition of section 15.8 advising that all council
resources must be returned at the end of employment.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 11
Section 3.12 - reordered to section 16.1 
Removed section 3.12.1 and replaced with “The Council
has a Guide to Recruitment and you are expected to
follow this policy (copies are available from Customer
Support Services and on the Hub.  All appointments must
be made on the basis of merit”.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 11
Section 3.13 – reordered to section 13
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 11
Section 3.14 – reordered to section 16.4 
Addition of section 16.4.3 “Whether or not your post is
politically restricted, you must follow every lawful
expressed policy of the Council and must not allow your
personal or political opinions to interfere with your work. 
You must not display political slogans in the course of
your work and must not distribute political
information/material using Council resources including
time”
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 12
Section 3.15 – reordered to section 9 
Section 3.15.1 moved to 12.6
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 13
Section 3.16 – reordered to section 10 
Addition of “you are also expected to treat others fairly
and reasonably” at 10.1 
Addition of “You are expected to forge and maintain
professional relationships with your colleagues,
managers, Councillors an service users based on mutual
respect” at 10.2
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 14
Section 3.17 – reordered to section 18
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 14
Section 3.18 – reordered to section 20 
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 15
Section 4 – reordered to section 23
Page 109

Page 110

Part F (3)
Ethical
Framework
Employee Code of
Conduct
Addition of Section 14 – Social Media outlining conduct
expected of employees using social media within/outwith
work taken from Social Media Policy.
Part F (3)
Ethical
Framework
Employee Code of
Conduct
Addition of Section 16.2 criminal Records “It is the
Council’s view that having a criminal record will not
necessarily debar an applicant from working with or on
behalf of the Council.  This will depend on the nature of
the position, together with the circumstances and
background of the offences”
Part F (3)
Ethical
Framework
Employee Code of
Conduct
Addition of Section 16.3 Professional Qualifications,
registrations and conduct which makes clear that if you
require to have a membership to a professional body
then you must keep that registration and ensure you
follow their code of practice in relation to any formal
reporting.
Part F (3)
Ethical
Framework
Employee Code of
Conduct
Addition of Section 17 Health, Safety and Welfare
outlining employee responsibilities in relation to health
and safety.
Part F (3)
Ethical
Framework
Employee Code of
Conduct
Addition of Section 20 Raising Concerns/Grievances
which outlines the process for doing so.
Part F (3)
Ethical
Framework
Employee Code of
Conduct
Addition of Section 22 Disciplinary Matters outlines the
process for raising or being subject of Disciplinary
Matters.
Part F (3)
Ethical
Framework
Employee Code of
Conduct Page 15
Amendments made to the names of the Procedures in
line with any that have been updated since last update. 
Page 110

Page 111

ARGYLL AND BUTE COUNCIL  COUNCIL   
29 SEPTEMBER 2022 
FREEDOM OF ARGYLL AND BUTE   
1. EXECUTIVE SUMMARY 
1.1 Donald MacMillan, BEM has represented the people and communities of
Argyll and Bute as a local independent councillor for almost 40 years. Often
cited as one of Scotland’s oldest and longest serving elected members, his
service as a councillor concluded in May 2022 at the age of 94. 
1.2 Mr MacMillan was first elected to represent his community in 1984, serving on
Strathclyde Regional Council and Argyll and Bute District Council prior to the
reorganisation of Scottish local government in 1996. He was elected to the
then-Lochgilphead ward of the new Argyll and Bute Council in 1995 in
readiness for the new unitary authority coming into effect, and continued to
represent the area through a variety of ward boundary changes until 2022. 
1.3 He received the British Empire Medal (BEM) in Her Majesty the Queen’s New
Year Honours in 2019, for his services to local government in Scotland. 
1.4 The Council has been asked to give consideration to awarding the Freedom
of Argyll and Bute to Donald MacMillan, BEM in recognition of his decades of
service to the community, through his role as a councillor and also his service
on other organisations. Council is invited to consider this request. 
Page 111 Agenda Item 9

Page 112

ARGYLL AND BUTE COUNCIL  COUNCIL   
29 SEPTEMBER 2022 
FREEDOM OF ARGYLL AND BUTE   
2. INTRODUCTION 
2.1 Donald MacMillan, BEM has represented the people and communities of
Argyll and Bute as a local independent councillor for almost 40 years. Often
cited as one of Scotland’s oldest and longest serving elected members, his
service as a councillor concluded in May 2022 at the age of 94. 
2.2 Mr MacMillan was first elected to represent his community in 1984, serving on
Strathclyde Regional Council and Argyll and Bute District Council prior to the
reorganisation of Scottish local government in 1996. He was elected to the
then-Lochgilphead ward of the new Argyll and Bute Council in 1995 in
readiness for the new unitary authority coming into effect and continued to
represent the area through a variety of ward boundary changes until 2022. 
2.3 In recognition of his decades of service, he received the British Empire Medal
(BEM) for services to local government in Scotland in HM The Queen’s New
Year Honours 2019. 
2.4 The Council has been asked to give consideration to awarding the Freedom
of Argyll and Bute to Donald MacMillan in recognition of his many years of
service to the community, through his role as a councillor and also his service
on other organisations. Council is invited to consider this request. 
3. RECOMMENDATIONS 
3.1 The Council is invited to consider the request to award the Freedom of Argyll
and Bute to Donald MacMillan, BEM in recognition of his many years of
service to Argyll and Bute as a local councillor and on other organisations
serving the community; and if agreed request the Executive Director with
responsibility for Legal and Regulatory Support make the necessary
arrangements. 
Page 112

Page 113

4. DETAIL   
4.1  The Local Government (Scotland) Act 1973 makes provision for local
authorities to award the freedom of the area to people who have given
particular service or brought distinction to the district. 
4.2 Donald MacMillan (or Donnie, as he is more commonly known to the people
of Mid Argyll where he lives) was first elected to represent his community in
1984, serving on Strathclyde Regional Council and Argyll and Bute District
Council prior to the reorganisation of Scottish local government in 1996. 
4.3 Since then he has represented his home town of Lochgilphead through
various ward boundary changes, including the expansion of the ward to
encompass the neighbouring communities of Ardrishaig, Inveraray, Furnace,
Minard, Crinan, Ardfern and a myriad of other settlements in between - all of
whom came to know and recognise the familiar face of ‘wee Donnie’ as he is
very affectionately known.   
4.4 Donnie has played a very active role at the council, sitting on a number of
committees over the years including Planning, Licensing and latterly
Community Services. His service to the council has included periods as
Depute Provost, Area Committee Vice-Chair and Depute Policy Lead among
other roles. He was also a committed member of the World War 1
Commemoration Steering Group, which convened prior to 2014 to plan and
prepare for the four-year centenary commemorations over the 2014 to 2018
period. 
4.5  He has also been active within many other organisations over the years,
appointed to a number of outside bodies to represent the council and its
communities. A particular area of interest for Donnie was his service on the
former Joint Police Boards at both regional and national level, prior to the
reform of Scottish policing, the creation of the single national force Police
Scotland and the consequent changes in its scrutiny and governance,
moving from joint boards to the Scottish Police Authority. Latterly Donnie
also served as a board member for Argyll Community Housing Association
- another role which was important to him and to which he was thoroughly
committed. 
4.6  While he enjoyed his work on these outside organisations and his
committee work, helping local people has always been the most important
factor for Donnie in terms of his role as a councillor. His focus has remained
on the local services that mattered to the people who lived and worked
alongside him and he has been a staunch champion for local health and
care services as well as those delivered by the local authority.     
Page 113

Page 114

4.7  Donnie is undoubtedly one of Lochgilphead’s most well-known faces and
the reason for this is linked inextricably to his priorities and approach as a
councillor - helping local people and doing so by working with them face to
face. Even just prior to the Covid-19 pandemic, Donnie could most often be
found in Lochgilphead and Ardrishaig town centres, making sure that he
was available and visible in the spaces that people use and ensuring that
he was able to speak to them and deal with any queries face to face.
Lochgilphead’s Colchester Square has very frequently been an open air
‘surgery’ venue for Donnie - informal and unscheduled but very much
valued by the local people who knew where and when they could find help
from Donnie if they needed it. 
4.8  As a much-loved and extremely popular local councillor for decades, it was
no surprise to the community, but a great surprise to him, that he was
awarded the British Empire Medal for services to local government in
Scotland in 2019, in Her Majesty the Queen’s New Year Honours List. He
received his medal with great pride in May that year, surrounded by family,
friends and colleagues from across Argyll and Bute.   
4.9  Donnie’s service as a local councillor concluded in May 2022 at the age of
94 and after nearly 40 years of service to the community. Donnie, though,
is still out and about in his home town nearly every day and remains rightly
proud of his time as one of Scotland’s oldest and longest serving local
councillors. 
4.10 One of his successors to the Mid Argyll ward, Councillor Jan Brown, has
made contact with the Leader of the Council and the Executive Director with
responsibility for Legal and Regulatory Support in relation to arrangements
for a formal request to Council to consider making the award of Freedom of
Argyll and Bute, on the basis that this is very richly deserved given the
extent of his commitment to serving his community. 
4.11 Section 206 of the Local Government (Scotland) Act 1973 makes provision
for councils to award the Freedom of the district by resolution passed by not
less than two-thirds of the voting members at a meeting of the Council which
specifies the proposal as an item of business. 
4.12 The Council keeps a roll containing the names of people admitted as
Freemen of Argyll and Bute in accordance with this section of the Act. The
last awards of Freedom of Argyll and Bute were made to former Provost
William Petrie in 2012, to Helensburgh tennis player Gordon Reid in 2016
and to former Lord-Lieutenant of Argyll and Bute, Patrick Stewart CVO
MBE, in 2022.   
Page 114

Page 115

5. CONCLUSION 
5.1 Donald MacMillan, BEM has given decades of service to communities in
Argyll and Bute as a local councillor. His dedication has been of a level to
warrant receipt of a national Honour from the Queen and he has dedicated
many years of his life to helping the people of the community who live and
work alongside him.   
5.2 Members of the Council are invited to consider the request to confer the
Freedom of Argyll and Bute on Donald MacMillan, BEM in recognition of his
years of service.   
6.0  IMPLICATIONS 
6.1  Policy; none.  
6.2  Financial; none. 
6.3  Legal; none. 
6.4  HR; none 
6.5  Fairer Scotland Duty: none 
6.5.1  Equalities - protected characteristics; none 
6.5.2  Socio-economic Duty; none 
6.5.3 Islands; none 
6.6  Risk; none 
6.7  Customer Service; none 
Executive Director with Responsibility for Legal and Regulatory Support –
Douglas Hendry 
3rd August 2022 
For further information please contact Aileen McNicol, Leadership Support and
Member Services Manager, on 01546 604014 or by email aileen.mcnicol@argyll-
bute.gov.uk 
Page 115

Page 116

This page is intentionally left blank

Page 117

ARGYLL AND BUTE COUNCIL          COUNCIL 
REFUGEE RESETTLEMENT           29 SEPTEMBER 2022 
UKRAINIAN REFUGEE RESETTLEMENT IN ARGYLL AND BUTE 
1.0 EXECUTIVE SUMMARY 
1.1 Argyll and Bute Council along with partner agencies and our communities are
working closely together to provide a warm welcome to those fleeing the war in
Ukraine.   
1.2 The Council supports both UK and Government sponsorship schemes and
Ukrainian Displaced People arriving in our authority are offered support to
rebuild their lives and recover from trauma.   
1.3 This report provides elected members with an update on the national position
and also provides an update on how the sponsorship schemes are operating
within Argyll and Bute and the support available locally to Ukrainian Displaced
Persons.   
1.4 The recommendations within the report are as follows, 
Elected members are invited to:
 Note the national position as set out in section 4 of this report and agree
that the Council should, through CoSLA and other representative bodies,
and on and individual basis if and when appropriate, make representations
for improvements to the Ukrainian sponsorship schemes; 
 Consider the current position in relation to Argyll and Bute as set out in
section 5 of this report. 
Page 117 Agenda Item 10

Page 118

ARGYLL AND BUTE COUNCIL          COUNCIL 
REFUGEE RESETTLEMENT           29 SEPTEMBER 2022 
UKRAINIAN REFUGEE RESETTLEMENT IN ARGYLL AND BUTE 
2.0 INTRODUCTION 
2.1 The war in Ukraine has resulted in a humanitarian crisis with over 12 million
Ukrainians having fled their homes. There are two sponsorship schemes
operating to welcome and support Ukrainian Displaced People to gain safety
and sanctuary and rebuild their lives in Scotland. 
2.2 The UK Government’s Homes for Ukraine scheme relies on individuals in the
UK acting as a sponsor and matching with people displaced from Ukraine. The
Ukrainian refugee matches with a sponsor before applying for a visa. This is
known as private matching and the majority of those arriving in Argyll and Bute
between May to July came through this scheme. 
2.3 The Scottish Government’s Super Sponsor scheme works within the UK
Government’s Ukraine sponsorship scheme and removes the need for
applicants to be matched prior to being given permission travel to the UK. By
acting as ‘Super Sponsor’, rather than waiting for the UK Government’s
matching process, Scotland could provide safety and sanctuary and welcome
significant numbers. In Argyll and Bute we saw an increase in numbers arriving
through this scheme in July, with it taking over as the predominant sponsorship
scheme during August and into September.   
2.4 Sponsors for both schemes are asked to provide accommodation for as long as
they are able, and for a minimum of 6 months. Eligibility extends to Ukrainian
nationals (or their immediate family) who were resident in Ukraine prior to 1
January 2022. Those arriving under both schemes are able to live and work in
the UK for up to three years, with full access to healthcare, benefits,
employment and education. 
Page 118

Page 119

2.5 This report provides elected members with an update on the challenges with the
sponsorship scheme and the national review underway led by Scottish
Government and CoSLA. This report also provides an update on how the
sponsorship schemes are operating within Argyll and Bute and the support
provided locally to Ukrainian Displaced Persons.   
3.0 RECOMMENDATIONS 
Elected members are invited to:
3.1 Note the national position as set out in section 4 of this report and agree that the
Council should, through CoSLA and other representative bodies, and on and
individual basis if and when appropriate, make representations for improvements
to the Ukrainian sponsorship schemes. 
3.2 Consider the current position in relation to Argyll and Bute as set out in section 5
of this report.   
4.0 DETAIL 
National picture 
4.1 The Super Sponsor scheme in Scotland is highly accessible and places no
requirement on Ukrainian Displaced People to seek out a private individual in
the UK willing to sponsor them. The Welsh Government paused its equivalent
Super Sponsor scheme on 10 June. By early July, Scotland had the highest
number of applications, visas issued and arrivals per head of population of any
of the four nations.   
4.2 With the rapidly increasing rates of arrivals and against a backdrop of continued
pressure on short-term accommodation, the Scottish Government announced a
pause to new applications to ensure those arriving could continue to access
suitable accommodation and support. This pause was for three months and did
not mean an immediate reduction in arrivals. During July and August we
experienced a significant increase in arrivals only slowing down when the
availability of flights, and other public transport became more difficult to come by.   
4.3 In light of this position and with a continued and increased reliance in short term
hotel accommodation on 4 August the Scottish Government commenced  a
rapid review of Scotland’s ‘Super Sponsor’ scheme with the aim of identifying
improvements to the scheme, including interventions able to reduce the duration
of stays in temporary accommodation. 
4.4 The hotel temporary accommodation situation was placing all local authorities
under significant pressure, particularly when combined with the other
requirements of the scheme such as carrying out background and property
checks for those expressing an interest in sponsoring, matching activity where a
Page 119

Page 120

suitable host is identified, plus ongoing resettlement and humanitarian work and
with increased host/public/media queries, etc. 
4.5 In Argyll and Bute there are further challenges due to our unique geography as
we had a large number of potential sponsors. We also have Ukrainian Displaced
People living with sponsors across the whole of the authority and are supporting
four temporary hotels.   
4.6 The rapid review is reaching its conclusion and the recommendations within the
report look to address the policy themes of accommodation, empowerment,
matching and housing. These policy recommendations will in turn be worked up,
in partnership with local authorities, into a suite of operational documents.   
4.7 However, there are concerns that the rapid review and its recommendations will
not address all of the issues with the Super Sponsor scheme. It is becoming
more evident that it is more challenging than originally anticipated to build a
sponsorship scheme on a foundation of mobilising community capacity. And by
the processes put in place without clear guidance, issues with the sharing of
data, lack of matching policy, increased reliance on use of hotels and without a
detailed understanding of the needs of the Ukrainian Displaced People arriving
in Scotland, this could be stifling the generosity that our communities have been
so keen to extend.   
4.8 The rapid review also places a heavy reliance on a private rental sector for
accommodation when the initial sponsorship is over or indeed as an alternative
to sponsorship. This availability of both private rented and social housing for
Ukrainian Displaced People has to be considered within the context of other
refugee programmes, dispersed asylum, increased homeless presentations
and, a cost of living crisis.   
4.9 It is also worth noting that, not unsurprisingly, there is a great diversity across
Ukrainian nationals arriving in Scotland through the Super Sponsor scheme and
a blanket approach to the implementation of the Super Sponsor scheme can be
disempowering for some and could miss the more complex needs of others.     
5.0 ARGYLL AND BUTE POSITION 
5.1 Within Argyll and Bute the council’s Resettlement Team continue to support
Ukrainian Displaced People and sponsors and will also ensure that local
knowledge and experience informs the development of guidance and any policy
changes at a national level.   
5.2 The humanitarian support in Argyll and Bute is coordinated by the multi-agency
Ukrainian Resettlement Group which meets fortnightly and includes council
services, partner agencies and the third sector. We have increased the size of
the Council’s Resettlement Team to provide advice and support to those living
with sponsors. To provide a wraparound support to those in temporary and
social housing and to provide welfare support for those in hotels. Interpreters
and translators have also been recruited to the team.   
Page 120

Page 121

5.3 The number of arrivals of Ukrainian Displaced People (UDP) to Argyll and Bute in
the past few months has increased.   
In sponsorship arrangements we have: 
111* UDPs with Homes for Ukraine visas where the sponsor and guest self-
match before arrival.   
64* UDPs with Super Sponsor visa where the UDP is matched with a sponsor or
is allocated social housing after a temporary stay in a hotel.    
In addition we have 57* UDPs with a Super Sponsor visa currently in temporary
hotel accommodation in Argyll and Bute where matching discussions are in
progress.   
5.4 The number of UDPs in sponsorship and temporary hotel accommodation
changes daily. As guests move out of the hotels when they are successfully
matched and are quickly replaced by new guests arriving into Scotland allocated
to temporary accommodation in the Argyll and Bute hotels. We also continue to
see a number of arrivals each week through the Homes for Ukraine scheme.  
5.5 Supporting UDPs in hotels allows the Resettlement Team to progress local
matching. We have had a total of 167* UDPs stay in the hotels since they
became operational and we have been successful in finding matches for 93*
persons who have moved out into sponsorship within Argyll and Bute or further
afield.  
5.6 Local matching is much more successful for Argyll and Bute than the national
matching service. This is because we have built a relationship of trust with the
UDPs and we know our area, our job market, our schools and our sponsors and
can make informed decisions on what would be a good and sustainable match
and what will not. The UDPs in the hotels, with a very small exception, are very
happy in Argyll and Bute but they are also clear that they do not want to stay
anywhere too remote.  
5.7 In addition to hotel accommodation and sponsors properties the Registered
Social Landlords have also made social housing available for the programme:
West Highland Housing Association  2 properties both now occupied
Fyne Homes 7 properties all now occupied
ACHA 5 properties being decorated,
carpeted and furnished 
5.8 We also provide ESOL (English for Speakers of Other Languages) classes and
interest and uptake is high so we are currently recruiting more ESOL tutors.   
* numbers accurate as on 21.09.2022 
Page 121

Page 122

5.9 At the beginning of August we launched our 3 months free bus pass scheme for
those who do not qualify for the national travel schemes for under 22s and over
60s. Our Argyll and Bute scheme has been put in place with the support of all of
the local transport providers. 
5.10 UDPs are very quickly securing employment and we have signed up our first
cohort of Ukrainians education professionals on our career pathway. This will
see them working in our schools initially in a support role to gain experience and
knowledge of our curriculum. We intend in time for this to lead GTCS recognition
or registration. The other benefit of this approach is this provides Ukrainian
speakers in schools with Ukrainian pupils. We have 50 pupils in 14 settings
across the authority.   
5.11 In August we held two very successful Welcome Fayres in Dunoon and Oban
where UDPs had the opportunity to engage with a wide range of council, partner
services and community organisations. The fayres also gave an opportunity to
meet with other Ukrainians living in their area and were very well attended. 
More fayres will be planned in the next few months.   
5.12 We offer additional support to our sponsors through a peer support group which
gives them the opportunity approximately once a month to meet the
resettlement team and one another and ask questions about the scheme. 
These online sessions have been well attended by sponsors at all stages of
their sponsorship journey. 
6.0 CONCLUSION 
6.1 There are challenges with supporting the Ukrainian sponsorship schemes in
Argyll and Bute and this report lays out these challenges. How sustainable the
Super Sponsor scheme is in the longer term is still to be determined and our
geography has certainly added to the challenges. However what is clear is that
our sponsors and our communities are supportive, welcoming and safe and
Argyll and Bute offers both a place to recover from the horror of war and to plan
for the future whatever that may be.   
6.2 The strength of partnership working in Argyll and Bute has also been integral to
the success of Ukrainian resettlement so far and the commitment of council
services, partner agencies and the third sector has made a real difference to the
lives of those coming here. 
7.0 IMPLICATIONS
7.1 Policy – No policy implications for Council. 
7.2 Financial - Funding is received from both the UK and Scottish Government’s
and the current budget is fully committed with a contingency in place to
Page 122

Page 123

deal with unexpected costs. We are awaiting the detailed funding
guidance from Scottish Government, a recommendation in the rapid
review. 
7.3  Legal – No implications. 
7.4  HR - A number of posts have been created on a temporary basis to support the
resettlement team and funded by government funding. 
7.5  Fairer Scotland Duty: - No implications 
7.5.1   Equalities - protected characteristics 
7.5.2   Socio-economic Duty 
7.5.3  Islands 
7.6 Climate Change – No implications 
7.7 Risk – No implications 
7.8  Customer Service – Council services have access to interpreters and
translators to ensure UDPs can access information and use local
services. 
Douglas Hendry 
Executive Director with responsibility for Refugee Resettlement 
Policy Lead – Cllr Robin Currie
08.09.2022                                                  
For further information contact: 
Morag Brown 
Business Improvement Manager / Resettlement Lead
Morag.brown@argyll-bute.gov.uk 
Page 123

Page 124

This page is intentionally left blank

Page 125

ARGYLL AND BUTE COUNCIL                  COUNCIL 
CUSTOMER SUPPORT SERVICES          29 SEPTEMBER 2022 
PILOT FOR REGISTRARS CONDUCTING FUNERAL SERVICES IN KINTYRE
AREA 2022 – FEES AND CHARGES 
1.0 EXECUTIVE SUMMARY
1.1. In Campbeltown and the surrounding area there is a lack of Church of Scotland
Ministers available to perform funerals and local undertakers have identified a
need for alternative celebrants to be available to perform funeral services.  The
Council has been approached by the local undertaker in Kintyre in regard to the
possibility of local Registrars conducting funeral services; using their experience
in completing death registrations and marriage ceremonies.  The Council
proposes a pilot scheme for a period of six months in the Kintyre area, where
Registrars will perform funeral services in co-operation with local undertakers,
with an interim report after three months to allow a decision as to whether the
service should be offered during the 2023/24 financial year.   
RECOMMENDATIONS 
It is recommended that the Council approves:- 
i. Registrars in Kintyre to establish a six month pilot scheme to perform
funeral services in co-operation with local undertakers, with an interim
report after three months to inform the budget process for 2023/24; and 
ii. The pilot fees and charges as set out within the report at section 4.3.   
Page 125 Agenda Item 11

Page 126

ARGYLL AND BUTE COUNCIL                  COUNCIL 
CUSTOMER SUPPORT SERVICES         29 SEPTEMBER 2022 
PILOT FOR REGISTRARS CONDUCTING FUNERAL SERVICES IN KINTYRE
AREA 2022 – FEES AND CHARGES 
2.0 INTRODUCTION
2.1. The purpose of this report is seek agreement from the Council to establish a six
months pilot scheme to undertake funeral services in the Kintyre area with local
undertakers.   
2.2. The Council have been approached by local undertakers in the Kintyre area in
regard to the possibility of local Registrars conducting funeral services.  There is
a lack of Church of Scotland Ministers available to perform funerals and local
undertakers have identified the need for alternative, suitably experienced
celebrants to be available to perform funeral services.   
3.0  RECOMMENDATIONS 
3.1    It is recommended that the Council approves:- 
i. Registrars in Kintyre to establish a six month pilot scheme to perform
funeral services in co-operation with local undertakers, with an interim
report after three months to inform the budget process for 2023/24; and 
ii. The pilot fees and charges as set out within the report at section 4.3.     
4.0 DETAIL
4.1  Officiating at funerals has not been a service that was offered by Argyll and
Bute Council registrars; although some other councils such as Edinburgh City
Council and East Ayrshire Council have offered it. Hitherto faith based celebrants
have fulfilled that role. However in South Kintyre the retirement and relocation of
ministers has meant that local undertakers have struggled to get celebrants for
funerals and asked the Campbeltown based registrars if they could help to fill the
gap; given their role in the registration of deaths and the celebration of
marriages/partnerships. The registrars in Campbeltown therefore propose a six
month pilot to establish exactly how the service could operate, the demand for
civil funeral ceremonies, scale of potential additional income and to inform future
innovation and partnership working. An interim report will be completed after three
months to inform budget related decision making, if the Service is to be offered in
Page 126

Page 127

the 2023/24 financial year. 
4.2  A memorandum of understanding will be put in place with the local undertakers to
ensure that they and their customers are aware of what the Council offer, what
will be charged and what the respective roles would be. 
4.3  The proposed fee for a Council Registrar conducting a funeral ceremony would
be £150 per ceremony, plus travel. The table below illustrated the charges of a
humanist celebrant to conduct a ceremony, and the charges of other Local
Authorities who also provide this service. The proposed Council’s fee is greater at
the weekend as it includes the remuneration for the registrar who will work on a
voluntary basis on a Saturday. The proposed fee is competitive with the humanist
alternative and reflects the actual costs of service delivery in a rural area.   
Fees and Charges 
Argyll and Bute Council 
Monday – Friday
£150 (plus travel) 
Argyll and Bute Council 
Saturday 
£250 (plus travel)
Humanist  £180 (plus travel) 
Edinburgh City Council  £90 (plus travel)
East Ayrshire  £100 (plus travel) 
4.4  The Council’s Registrars would provide the service during Monday to Friday. If a
Saturday was required, it would only be offered if a Registrar was available and
willing to fulfil the engagement. The proposed fee for a Saturday would be £250
with the remuneration for staff set at the current fee for a marriage/civil partnership
ceremony. A minimum of 3 days’ notice would apply for a registrar to conduct the
service. 
4.5 Indications from undertakers are that 90% of the funeral services would be Monday
to Friday and our Registrars would take on these ceremonies as part of their
weekly duties. The same 60p per mile currently charged for marriage ceremonies
in the fees schedule would be applied for any travel required to external venues.
Currently at weekends Registrars are paid a fixed allowance to officiate at marriage
ceremonies and each ceremony is allocated a notional three hours to complete
including the travelling time. If Registrars were to officiate at a funeral service at
weekends, then the same allowances would apply, leaving a minimum £150 in
Saturday income for the Council to cover core costs.  
4.6  Officers have been provided with death figures for Campbeltown District for the last
3 years, where the ceremonies were conducted by a Minister of Religion. The
figures also include the number of Humanist funerals. Naturally, only a proportion
of these would be done by Registrars.  However, if 30% were completed by
Registrars, it would bring in circa £6k a year. However the pilot will help establish
actual demand.
Page 127

Page 128

Year Total Funeral Ceremonies Humanist Funeral
2021 132 1
2020 113 0
2019 97 2
4.7 There is scope for the Council’s Registrars in Campbeltown to take on this service
in addition to marriage ceremonies as there is a relatively low number of marriages;
in 2021 there were 14 civil marriages and 2 civil partnerships in Campbeltown
District for the year.  Minimal training would be required as registrars are already
experienced in assisting the bereaved through their death registration activities and
in preparing for and undertaking ceremonies from their marriage related activities.
The pilot would help to inform the potential to extend the service to other areas.
4.8 A new process for the funeral service Pilot would require to be set up on our
Registration system; Oracle. All documentation relating to the funeral ceremony
where our Registrars have had to capture information about the deceased would
be stored on the Oracle CRM system. A privacy statement would tell customers
how the information that they provide will be used and protected. A Data Protection
Impact Assessment would require to be done to confirm how we would manage the
information that we have collected and also how long we will retain this for. All
current Health and Safety procedures currently in place for civil marriages and civil
partnerships would apply for civil funerals.
4.9  At the end of the six months pilot, officers will report back to the Executive
Leadership Team as to the potential for extending the service further. An interim
report will be submitted as part of the budget setting process in February 2023 to
allow matters such as fees to be considered for the 2023/24 financial year.    
5.0  CONCLUSION 
5.1 As there is a shortage of Church of Scotland Ministers and Celebrants in the
Kintyre area, this pilot will allow Council Registrars to provide a skill set to conduct
a much needed service to the public and is a source of fee income for the Council.
A 6 month pilot is proposed in the Campbeltown District (with an interim report by
February 2023).  Based on the 132 death figures for 2021 and some of these being
conducted at weekends, there is a potential income of over £6,000 per year.  If the
pilot is successful it could also be rolled out to the other areas within Argyll and
Bute where the reducing number of faith based officiants means there is a
requirement for civil officiants at funerals. 
6.0 IMPLICATIONS
6.1 Policy – depending on the outcome of the pilot, a policy would be put in place
for any permanent arrangements offered.  A local Memorandum of
Understanding will be put in place with local undertakers for the duration of the
pilot.   
Page 128

Page 129

6.2  Financial – the pilot will inform a possible new income stream for the Council.   
6.3  Legal – none known.   
6.4    HR – there are no changes to employee Conditions of Service.   
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – none known.  
6.5.2  Socio-economic Duty – none known.  
6.5.3  Islands – none known.   
6.6 Climate Change – none known.     
6.7  Risk – none known.   
6.8  Customer Service – the arrangements of this pilot will provide a new service to
meet a local need and is aligned to current registration services and skills.   
Executive Director with responsibility for Development and Infrastructure,
Kirsty Flanagan 
Policy Lead for Climate Change and Environment Services 
Cllr Ross Moreland 
For further information, please contact:- 
Jane Fowler – Head of Customer Support Services  
Robert Miller – Customer Engagement and Transformation Manager     
September 2022         
Page 129

Page 130

This page is intentionally left blank

Page 131

ARGYLL AND BUTE COUNCIL      COUNCIL
CUSTOMER SUPPORT SERVICES      29th SEPTEMBER 2022 
COST OF LIVING AND FUEL COST CRISIS BRIEFING 
1.0 INTRODUCTION 
1.1 This report presents members of the Council with a briefing on the Argyll and
Bute specific issues of the cost of living and fuel crisis which shows that 70% of
our households are at risk of fuel poverty or extreme fuel poverty. The briefing is
for members’ information and for use in any situation that may be appropriate
and useful in influencing policy decisions and conveying the particular impact
that the cost of living and fuel cost increased in Argyll and Bute. 
1.2 The briefing highlights the particular on-costs facing people who live in our remote
rural and island communities that exacerbate the current, unprecedented
increases in the cost of living, particularly fuel costs. 
2.0 RECOMMENDATIONS 
2.1 That Council agree the attached briefing for use in conveying the additional impact
that the cost of living/fuel cost crisis has on Argyll and Bute’s communities and
households.
2.2 That Council agree the four key asks of Government to alleviate the particular
impacts of the cost of living/fuel cost crisis faced by our communities. 
3.0 DETAIL 
3.1 Argyll and Bute has the second largest mainland area of Scotland, the highest
number of inhabited islands and the highest percentage of people living in Remote
Rural Areas of all mainland councils. 
3.2 We have the third lowest median pay rate (gross) of all Scottish Local Authorities
and were ranked most vulnerable to post Covid economic shock. The on-costs of
living in our communities range from 13% to 185% above costs in urban UK areas.
Because of this, and issues of heating fuel and housing types, nearly 70% of all
households in Argyll and Bute are at risk of fuel poverty or extreme fuel poverty. 
Page 131 Agenda Item 12

Page 132

3.3 The briefing note sets these statistics out and identifies 4 key asks of Government
to recognise these issues when they are implementing support and/or policy
change to alleviate this crisis. 
4.0 CONCLUSION
4.1 Argyll and Bute has a large number of structural geographic and socio-economic
issues that exacerbate the high risks to households from the cost of living and fuel
cost crisis. The attached briefing note provides a summary of key facts about this
that can be used to inform and influence decisions on policy and support on these
issues to help our communities. 
5.0 IMPLICATIONS
5.1 Policy: None 
5.2 Financial: None 
5.3  Legal: None 
5.4  HR: None 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics: None directly from this report 
5.5.2   Socio-economic Duty: This paper highlights the additional costs faced
by remote and rural communities in cost of living and fuel costs. 
5.5.3  Islands:  This paper highlights the additional costs faced by remote and
rural communities in cost of living and fuel costs.
5.6 Climate Change: None 
5.7 Risk: This paper highlights risks to households from the cost of living and fuel
cost crisis
5.8  Customer Service: None
Kirsty Flanagan
Executive Director with responsibility for Customer Support Services
Policy Lead 
September 2022                                                  
For further information contact: Jane Fowler, Head of Customer Support Services;
Jane Jarvie, Communications Manager
APPENDICES
Appendix 1 Cost of Living/Fuel Cost Briefing
Page 132

Page 133

OUR SITUATION IN BRIEF
This is a great part of the world to live, key to the economic success of Scotland and the UK more
widely. However average income is lower, costs are higher – nearly 70% of households are at risk 
of fuel poverty or extreme fuel poverty.
Argyll and Bute 
– cost of living crisis case for support
Actions
We call on the Government to:
Urgently provide information on funding for people who do not get their energy through typical
means: 50% of our households are non-gas compared to 14% of all Scottish properties.
Apply price caps to oil, LPG and solid fuel to ensure all households are given the support they
need to heat their homes.
Remove the variable standing charge rate that compounds the already higher costs for
households in remote and rural areas. This must be changed to a uniform charge.
Deliver equity in all support for the cost of living and fuel cost crisis by making sure that support
measures are pivoted to take account of the additional costs of remote, rural and island living.
Nearly 70% 
of households
in Argyll and Bute are
at risk of fuel poverty.
The price cap announcement
does not help Argyll and Bute 
– the cost of heating homes 
here is estimated to be more
than double the price cap 
figure for an average household.
To avoid fuel poverty an average all-electric
household would need an income of at least
£72,200 per annum, or to avoid extreme fuel
poverty £39,600; this compares to a median
household income of just under £33,000 
(and excludes impact of increased costs 
elsewhere such as food).
Food, clothing, travel – these cost between
13% and 185% + more
than in urban UK
however disposable income in Argyll and
Bute is 10% less than the UK average.
Supporting Argyll and Bute is supporting Scotland and the wider UK economy – we are a key location
for industries vital to the immediate and longer term economic success of the country (eg tourism, food
and drink, renewable energy)
Scotland and the UK need people to live and work here – people need support, equitable with the rest 
of the country, to live and work here.
EquityEquality VS
Food, clothing,
travel – these cost
between 13% and
185% + more than 
in urban UK
UK /
SCOTLAND ARGYLL & BUTE
FOOD
HOUSEHOLD
GOODS
CLOTHING
FUEL
TRAVEL 185%
70%
34%
22%
13%
Key points
Page 133

Page 134

BACKGROUND INFORMATION
Economy
The economic impact of rurality on spending power is recognised as considerable. A recent Scottish
Government Report: ‘The impact of Rurality and Remoteness on the cost of living’ highlights the additional
costs incurred by rural households in comparison to urban UK.
Argyll and Bute Council serves the second highest mainland area of Scotland’s councils, and the highest
number of inhabited islands – and we have the highest percentage of population living in Remote Rural Areas
of all mainland Local Authority Areas, at 43% (Scottish Government Urban Rural Classification).
In addition, Argyll and Bute has the third lowest median weekly pay rate (gross) of all Scottish Local Authority
Areas  (Source: Nomis, covering the period Jan-Dec 2021).
Argyll and Bute was ranked most vulnerable in the Vulnerability Index 2020 in terms of economic shock from
the covid pandemic.
The price cap / fuel poverty
The £2,500 figure is based on a ‘typical’ household on a dual-fuel (80% gas/20% electricity) deal with
‘median consumption’; it does not address costs of households using higher levels of energy and/or
households that are all-electric or dependent on other sources.
Non-gas households have been struggling with fuel poverty long term: in 2017, before COVID and cost
of living crisis, Citizens Advice said:
Households in rural areas are particularly likely to
use unmetered fuels for heating. Households without
mains gas are more likely to be in fuel poverty; 
in Scotland, 56% of off-gas households are in fuel
poverty, compared with 29% that use mains gas.”
Sources
Findings in this report come from a variety of sources with some correlated with estimations calculated by
council services.
Increased costs of food, clothing and travel in rural areas – ‘The Impact of Rurality and Remoteness 
on the cost of living’
Lower disposable income in Argyll and Bute: Office for National Statistics
Percentage of non-gas households: various sources indicate around 50% and above (Scottish House
Condition Survey /2011Census/ Department of Business, Energy and Industrial Strategy/Citizens Advice
Nearly 70% of households at risk of fuel poverty and incomes required to avoid fuel poverty:
We took figures from the most recent Scottish House Condition Survey (2019) showing Argyll and Bute
Council is in the top 3 local authority areas in Scotland with the highest percentage of fuel poverty 32% ,
looked at how prices have increased since then, and considered relevant information from a range of 
other sources – CACI Paycheck data/Ofgem price cap figures (2019 to October 2022)/Scottish House
Condition Survey analysis conducted by Energy Action Trust/Home Analytics. The figure we reached 
is in line with estimates from another source – the Energy Saving Trust which calculated their figures using
information in home energy certificates.
Page 134

Page 135

ARGYLL AND BUTE COUNCIL                  COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH                       29 SEPTEMBER 2022 
ARGYLL AND BUTE COUNCIL’S SHORT TERM LET LICENSING SCHEME 
1.0 EXECUTIVE SUMMARY
1.1 This report seeks approval of the arrangements for the Council’s Short-term
Let Licensing Scheme. The licensing scheme was brought in by the Scottish
Government under the Civic Government (Scotland) Act 1982 (Licensing of Short-
term Lets) Order 2022, with the aim to ensure short-term lets are safe,
address issues faced by neighbours, to facilitate local authorities knowing
and understanding what is happening in their area, and handling
complaints effectively. It also aims to balance the economic and tourism
benefits from short-term lets with the needs and concerns of local
communities across Argyll and Bute. This is therefore a statutory obligation
of the Council. 
1.2 To help inform the contents of this report, a formal public consultation was
carried out on initial draft proposals.  There was a very healthy and positive
response. The key outcomes gathered by the consultation have influenced
the final scheme and licensing policy proposed within this report. 
1.3 A new licensing system in now ready for Committee consideration, comment
and approval. This meets the new statutory duty to have a scheme in place
to receive and determine applications from new hosts as of the 1st October
2022.  It should be noted that no additional resources have been provided by
the Scottish Government to deliver the scheme. Recruitment is therefore
ongoing for new posts (permanent and fixed term) and a communication
strategy is in place to manage expectations until staff are in place. 
1.4 The licensing scheme will be self-financing from fee income. The Council
have assessed all relevant information and databases to identify the total
number of short-term accommodation premises in Argyll and Bute that fall
within this licensing scheme. The Council’s Non-Domestic Rates (NDR)
statistics indicate 2,650 properties although the actual numbers are likely
to be significantly greater. Unfortunately, despite taking advantage of a
number of different databases available to the Council, it is impossible to
provide an exact total. A cautious approach has however been taken in
setting fees and charges and resourcing for the licensing scheme, and
Page 135 Agenda Item 13

Page 136

income/expenditure levels will be closely continuously monitored. 
RECOMMENDATIONS: 
The Council is asked:- 
a) To note the considerable work undertaken to develop the new licensing
regime in a challenging timescale, and without any additional funding or
resourcing provided by the Scottish Government. 
b) To welcome the high level of responses to the public consultation, and
recognise that many of the issues raised have been incorporated into the
final licensing regime.
c) To approve the Short-term Let licensing regime, Licensing Policy,
additional conditions and fee and charges as set out in sections 5.4 and
5.6 
d) To note the initial focus on “New hosts” initially until additional staff
resources are in place.
e) To amend the Council’s Scheme of Delegation to delegate responsibility
for the Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets)
Order 2022 to the Executive Director with responsibility for Regulatory
Services, to enable the Council’s Environmental Health Service to authorise
officers to deliver the Short-term Let licensing regime. 
Page 136

Page 137

ARGYLL AND BUTE COUNCIL                  COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH                       29 SEPTEMBER 2022 
ARGYLL AND BUTE COUNCIL’S SHORT TERM LET LICENSING SCHEME 
2.0 INTRODUCTION
2.1 This report seeks approval of the arrangements for the Council’s Short-term
Let Licensing scheme. The licensing scheme was brought in by the Scottish
Government under the Civic Government (Scotland) Act 1982 (Licensing of Short-
term Lets) Order 2022, with the aim to ensure short-term lets are safe,
address issues faced by neighbours, to facilitate local authorities knowing
and understanding what is happening in their area, and handling
complaints effectively. It also aims to balance the economic and tourism
benefits from short-term lets with the needs and concerns of local
communities to ensure the people providing short-term lets are suitable. 
2.2 Local authorities must introduce a new mandatory licensing system for
short-term lets for 1st October 2022 to receive applications from existing and
new “hosts” and thereafter determine them.  The scheme will cover a wide
range of residential accommodation including, but not exclusively, self-
catering properties, B&B’s, guesthouses, glamping pods and yurts. 
2.3 Despite the challenging timescale, a licensing system has been developed for
Committee consideration and approval. This process has involved considerable
work by an Officer Steering Group, formal public consultation on draft proposals,
the development of an in-house digital information management system to make
and receive applications, a new licensing policy, and a fees and charges
structure. The outcomes from public consultation have influenced the final
licensing system. 
3 RECOMMENDATIONS
3.1  Council is asked to consider this report and the following recommendations:
a) To note the considerable work undertaken to develop the new licensing
regime in a challenging timescale, and without any additional funding or
resourcing from the Scottish Government. 
b) To welcome the high level of responses to the public consultation, and
recognise that many of the issues raised have been incorporated into the
final licensing regime.
c) To approve the Short-term Let licensing regime, Licensing Policy,
additional conditions and fee and charges as set out in sections 5.4 and
5.6
Page 137

Page 138

d) To note the initial focus on “New hosts” initially until resources in place.
e) To amend the Council’s Scheme of Delegation to delegate responsibility
for the Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets)
Order 2022 to the Executive Director with responsibility for Regulatory
Services, to enable the Council’s Environmental Health Service to authorise
officers to deliver the Short-term Let licensing regime. 
4 DETAIL
4.1 The licensing scheme was brought in by the Scottish Government under the
Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022, with
the aim to ensure short-term lets are safe, address issues faced by
neighbours, to facilitate local authorities knowing and understanding what is
happening in their area, and handling complaints effectively. It also aims to
balance the economic and tourism benefits from short-term lets with the needs
and concerns of local communities to ensure the people providing short-term
lets are suitable.
The Council is required to receive and determine applications of short-term lets
and issue appropriate licences and conditions. Integral to this will be supporting
applicants to ensure compliance and addressing any representations for
communities, neighbours or statutory consultees. The Scottish Government
expect local authorities to enforce these requirements and to target non-
compliance.  Licensing Officers will be employed to carry out proportionate
regulation. 
4.2 An Officer Steering Group has developed the new Short-term let licensing
regime to meet the Council’s statutory duty. This work has been challenging and
has involved a formal public consultation on draft proposals, the development of
an in-house digital information management system to make and receive
applications, a new licensing policy, and a fees and charging structure. Subject
to approval, the Council will be in a position to receive applications initially from
new hosts, until new posts have been recruited which is likely to be December
2022. The scheme is to be managed and delivered by the Council’s
Environmental Health Service as there are synergies with their existing work in
private landlord registration, houses in multiple occupation and caravan site
licensing.
4.3 The public consultation on the Council’s draft policy statement for short-term
let licensing ended on 5th August 2022. 552 responses were received, with a
significant majority of respondents agreeing with the Council’s proposals. The
recommendations arising from analysis of the consultation are detailed in
Appendix I, have been agreed by the Council’s Short-term Let Steering Group
and are built into the proposed scheme, namely:
i. The consultation supports including children under the age of 10 in
setting occupancy levels.
ii. The consultation supports the adoption of all of the proposed
additional conditions as set out in the draft policy statement with
minor modifications. 
iii. The consultation identifies that the Council should consider providing
temporary exemptions from the requirement to hold a licence. This is
an important flexibility for island communities and in relation to events
Page 138

Page 139

such as the Tarbert series and the Cowal Games. There requires to
be some protection for the security of tenure of private tenants.
iv. The consultation identifies a role for temporary licences to be
considered in limited circumstances, for example, to ensure that
short-term lets can continue as going concerns when being sold from
one operator to another.
v. Fees and charges were inevitably controversial and attracted much
comment. The setting of differential fees for home letting and home
sharing compared with secondary lets was nevertheless generally
supported, in line with Scottish Government guidance.
vi. The proposed fee structure was more controversial, with most
respondents dissatisfied that the actual fee levels could not be
included in the consultation. 
4.4  Licensing Policy. The licensing policy (Appendix II) details the key details of
the scheme for Council’s approval.  This provides the policy against which
applications will be considered and specifies arrangements for temporary
exemptions, temporary licences planning control areas, conditions and and a
range of other critical areas. 
4.5 Licensing processes.. The processes generally mirror the Council’s existing
civic government licensing processes, and are being adapted to meet the short-
term let licensing requirements. The draft policy was part of the recent public
consultation and amended to reflect public feedback. An in-house ICT system
is being developed to provide a “digital system” to receive and process
applications, including payment of fees, which will go live the next working day
after the 1 October 2022.
4.6 Additional Conditions. All licensed short-term lets will be required to comply
with a set of mandatory conditions that apply across all of Scotland. The
mandatory conditions are set out in the Order and Councils have a
discretionary power to impose additional conditions for short-term let
premises. Recognising some of the current issues relating to let
accommodation, draft additional conditions covering the areas of antisocial
behaviour, littering and waste disposal, noise control in flatted properties,
damage to properties, guest safety (hot tubs, swimming pools, barbeques
and other equipment) were consulted on. These have been amended in light
of consultation responses and legal advice has confirmed that they are not
“ultra-vires” and can be defended if challenged.  The proposed additional
conditions are detailed in Appendix 2. 
4.7 Temporary Licences. Whilst not initially intending to issue temporary licences,
consultation feedback identified that there would be instances where temporary
licences would be appropriate. The main area would be in the sale of a licensed
property, where grant of a temporary licence would allow the property to
continue to operate, as the licence is specific to the owner and not the short-
term property. The Council’s licensing regime includes temporary licences.
4.8 Temporary Exemptions. The Order provides temporary exemptions to the
requirement for a licence for a single continuous period not exceeding 6
weeks in any 12-month period. This could cover major events where
Page 139

Page 140

accommodation is provided in homes and other properties for a short period.
Initially, the Council’s draft scheme did not intend to provide for this
exemption, but following consultation, this has been incorporated into the
licensing policy 
4.9 Short-term Let Control Areas. The Order permits planning authorities to
establish Short-term Let Control Areas requiring a dwellings within the
designated areas used for secondary letting on a short-term basis within the
designated areas, to obtain planning approval for a “material change of use”.
This is not a ban on short-term lets but allows planning policies to assess the
use of a dwelling.  No Short Term Planning Control Areas will be in place at
inception of the Councils’ Short Term Let Licensing regime on the 1st
October. Careful consideration on the impact of the scheme on housing supply,
tenure and availability is be required and must be “data driven”. This work will
commence in 2023 by the Council and Loch Lomond and the Trossachs
National Park Authority, as relevant planning authorities.
4.10 There is currently no staff capacity within the existing licensing, or
environmental health teams, to take forward the short-term let licensing
regime and the determination of large volume of applications in the 21
months following the 1st October. This will require a permanent core team of
1 Team Lead, 1 Enforcement Officer and 1 Licensing Assistant with another
Licensing Assistant and Licensing Officer employed on a fixed term contract.
Additional Temporary Licensing Assistants will be required at busy times,
although recruitment of a Modern Apprentice will also assist the team and at
the same time offer a job opportunity for a young person.  These posts are
currently being advertised and it is hoped that the team will be in place early
December. Prior to recruitment, public expectations will be managed through
active communication with the short-term let sector and wider general public. 
5 Fees and charges
5.1 The Scottish Government did not provide any additional funding to local
authorities to develop and implement this new duty, and consequently the
scheme will need to be self-financing through short-term let licensing income.
Each local authority is required to set its own fees and charges having regard
to Scottish Government Guidance “Short Term Lets in Scotland Licensing
Scheme- Part 2 Supplementary Guidance for Licensing Authorities, Letting
Agencies and Platforms”. These fees must cover all expenditure associated
with delivering and enforcing the short-term let licensing regime.
5.2 The Council have assessed all relevant information and databases to identify
the total number of short-term accommodation premises in Argyll and Bute
which fall within this licensing scheme. The Council’s Non-Domestic Rates
(NDR) statistics indicate 2,650 properties although the actual numbers are
likely to be significantly greater. Unfortunately, despite taking advantage of a
number of different databases available to the Council, it is impossible to
provide an exact total. To project expenditure required to deliver the  licensing
scheme and develop a charging regime, a cautious approach has been
adopted, assuming 3,500 properties. The Council’s fees will be revised again
once all properties have been licensed and in advance of the next 3 year
Page 140

Page 141

licensing regime. Fees will be being increased, or decreased accordingly,
subject to income and expenditure levels. 
5.3 
5.4
The Scottish Government recommend that local authorities establish a fee
structure that takes account of the type of licence with lower fees set for
home sharing and home letting licences than for secondary letting licences;
and guest capacity in terms of the maximum number of guests. 
Following careful consideration and taking into account the views from the
consultation, the weighting and bandings were reduced in number and fee
ratios. The standard fee was based on the Council’s existing civic
government licence fees (£524; £452 and £271) as short term let licensing
mirror these processes. The mid range fee of £452 was adopted to minimise
the potential for over recovery of fees based on estimated properties
requiring a short-term let licence. Applying a weighting and banding structure
(see Appendix 2) consistent with Scottish Government guidance, the
following fees are therefore proposed to cover a three year license period for
each property: 
Guest capacity applied for
(including children under the
age of 10)
Home sharing or
home letting
licence
Secondary
letting licence
Up to 4 £226 £316
5 to 8 £316 £452
9 to 12 £497 £678
13 to 20 £633 £904
21 and over £814 £1130 
For comparison, the House in Multiple Occupation licence fee for premises
with 10 or more people is £1,101. The lowest fee of £226 under this model is
also less than the lowest standard band of other Civic Government license
fees of £275. An example of this is a license for a window cleaner.
5.5 Projected costs to deliver the licensing scheme are £1.32M (million), which
includes permanent, fixed term and temporary staffing over a three-year
period to March 2026, including start-up costs for 22/23. Projected fee
income is worst-case scenario (based on the 2,650 properties) is £1.03M
with mid-range (based on 3,500 properties) of £1.37M. 
5.6 The legislation permits the recovery of enforcement costs where an
intervention is required to properties arising from ongoing complaints or
whether there is a failure to comply with conditions relating to the premises.
The decision to charge will be based on the principles of proportionality in
accordance with Councils and Regulatory Services Enforcement Policy and
the Scottish Government’s Strategic Enforcement Code. This has been built
into the proposed additional charges outlined below. 
Additional charges 
Temporary Licence  50% of fee
Variation in Licence/change in circumstances £77
Page 141

Page 142

Certified copy of licence/duplicate licence £41
Temporary exemption application 50% of fee
Enforcement charge (Hourly rate)  £94.30 
6 CONCLUSIONS
6.1 The short term licensing scheme detailed in this report meets the mandatory
duty placed on the Council for short- term let accommodation. The Council
carried out a public consultation on the proposed scheme and made changes
to the initial proposals.  Concerns from the business community have been
expressed that fees are likely to be excessive and adversely impact on their
ability to continue trading. The fees put forward by this report are designed to
simply recover all costs incurred by the Council and in no way considered
excessive.  The fees proposed equate to £76 annually (licensing fees cover a
3 year period) for a small bed and breakfast with less than 4 guests; and £151
annually for a self-catering property for 6 guests.
6.2 This is only the first stage of the process as we need to recruit staff as
detailed in this report and then deliver the licensing scheme. The Planning
Authority for much of Argyll and Bute, together with the Loch Lomond and
the Trossachs National Parks Authority, require to consider the necessity for
any Short-term Let Planning Control Areas to be introduced. 
7 IMPLICATIONS
7.1 Policy Consistent with the Council’s Corporate Plan and new statutory
duty
7.2 Financial The licensing scheme is to be self-financing from income
levels. Estimates used to set fees and will be closely
monitored. Fees will be reviewed regularly and for the next
three year licensing period.
7.3 Legal Meets Councils new mandatory duty under Civic Government
(Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022,
7.4 HR New posts are being recruited funded by income.
7.5  Fairer Scotland
7.5.1 Equalities No adverse impact on protected characteristics and scheme
impacts on all providers 
7.5.2 Socio-
economic
Ensures that let accommodation is safe, applies consistent
standards across all sectors and protects communities
7.5.3 Islands Licensing scheme will be consistently applied across the whole
of Argyll and Bute.
7.6 Climate
change
Conditions support climate change and environment standards
7.7 Risk (1) Councils legal duty will be met on approval of the
scheme
(2) Inadequate resources are in place to deliver the full
scheme as of the 1 October, as the team is unlikely to
be recruited until early December. This situation will be
managed to ensure we can receive and determine
Page 142

Page 143

applications from “new hosts”
(3) Income does not fully cover expenditure or over-
recovery. This will be monitored
7.8 Customer
Service
Consistent with customer charter   
Kirsty Flanagan, Exec Director
Policy Lead: Councillor Kieron Green
For further information: Alan Morrison, Regulatory Services and Building Standards
Manager 
20 September 2022 
APPENDICES 
Appendix 1 – Report on the consultation for a short-term lets licensing policy –
August 2022 
Appendix 2 - Short-term Lets Licensing Draft Policy Statement
Appendix 3 - Post-consultation review of proposed fee structure for short-term lets 
Page 143

Page 144

This page is intentionally left blank

Page 145

Page 1 of 29 
Argyll and Bute Council 
Report on the consultation for a short-term
lets licensing policy – August 2022 
Contents
Contents .......................................................................................................................................... 1
Executive summary ................................................................................................................................. 2
Introduction ............................................................................................................................................. 3
Type of respondent ................................................................................................................................. 3
Draft licensing policy ............................................................................................................................... 4
Occupancy levels and children ................................................................................................................ 4
Additional conditions .............................................................................................................................. 5
Proposed additional conditions ........................................................................................................... 5
Antisocial behaviour (link to condition) .......................................................................................... 5
Noise control in flatted premises (link to condition) ....................................................................... 6
Littering and waste disposal (link to condition) .............................................................................. 8
Damage to property (link to condition) ........................................................................................... 9
Additional conditions for guest safety .......................................................................................... 10
Temporary exemptions ......................................................................................................................... 11
Proposal not to grant temporary exemptions ................................................................................... 11
Should additional conditions apply to temporary exemptions ......................................................... 13
Temporary licences ............................................................................................................................... 13
Should the Council introduce temporary licences ............................................................................ 13
If temporary licences are introduced, should additional local conditions apply............................... 14
Fees and charges ................................................................................................................................... 14
Different scales of fees for home sharing and home letting licences compared with secondary
letting licences ................................................................................................................................... 14
Other comments received in the course of the consultation ................................................................ 18
Appendix 1 – Summary of recommendations ....................................................................................... 21
Appendix 2 – Consultation questionnaire ............................................................................................. 22
Appendix 3 – Proposed additional conditions ....................................................................................... 25
Additional conditions based on Part 2 Guidance .............................................................................. 25
Additional Conditions for Guest Safety ............................................................................................. 26
Page 145

Page 146

Page 2 of 29 
Executive summary
The Council’s draft policy statement for short-term let licensing was put to public consultation
through the Council’s website for a period of three weeks ending on 5th August 2022. 552 responses
were received, with a significant majority of respondents agreeing with the Council’s proposals.
The recommendations arising from analysis of the consultation are summarised at Appendix 1. 
The consultation supports including children under the age of 10 in setting occupancy levels. 
The consultation supports the adoption of all of the proposed additional conditions as set out in the
draft policy statement with minor modifications. However, work is required to determine in what
form a condition should be worded to protect residents from impact noise in flatted premises.
The consultation identifies that the Council should consider providing temporary exemptions from
the requirement to hold a licence. This is an important flexibility for island communities and in
relation to events such as the Tarbert series and the Cowal Games. However, any temporary
exemptions policy should be drafted in such a way as to protect the security of tenure of private
tenants.
The consultation identifies a role for temporary licences to be considered in limited circumstances,
for example to ensure that short-term lets can continue as going concerns when being sold from one
operator to another.
Fees and charges are, inevitably, controversial and attracted much comment. The setting of
differential fees for home letting and home sharing compared with secondary lets was generally
approved, in line with Scottish Government guidance.
The proposed fee structure was more controversial, with most respondents dissatisfied that the
actual fees could not be included in the consultation. More work is required to refine the bandings
and the weightings to be used in setting fees. 
Other comments received in the course of the consultation are reviewed.
Page 146

Page 147

Page 3 of 29 
343
Introduction
The Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 20221 establishes for
the first time a mandatory licensing scheme for short-term let accommodation across Scotland.
From 1st October, each licensing authority is required to be able to receive applications.
Licensing authorities must develop a policy on temporary exemption from the requirement to hold a
licence. They are also expected to develop policies on: licence duration and renewal, temporary
licences, additional conditions, and compliance and enforcement.
In accordance with Scottish Government guidance2, Argyll and Bute Council put a draft licensing
policy statement to public consultation through its website for three weeks, with the consultation
closing on 5th August. 552 responses were received. A copy of the consultation questionnaire is
reproduced at Appendix 2. 
This report reviews the responses to the consultation and makes recommendations for the revision
of the draft licensing policy.
In this report, comments from respondents are selected to show the full range of views on a topic,
are reproduced verbatim, and are formatted as follows: 
Type of respondent
Respondents were asked to indicate in what capacity they were answering the consultation
questionnaire. 
Other (please specify)   28 
Trade association (please specify)   2 
Community Council  6 
Short-term let neighbour    80     
Other member of the public    80     
Short-term let host/operator     
Short-term let guest   13   
Figure 1 Type of respondent 
1 https://www.legislation.gov.uk/sdsi/2022/9780111052396/contents
2  https://www.gov.scot/publications/short-term-lets/
 This needs to be a fair system and proportionate to the issue. Vast majority of holiday
lets are ran well with no issues.
Page 147

Page 148

Page 4 of 29 
343 (80%) of responses were from hosts and operators. 160 (28%) of responses were from the
neighbours of short-term lets and from other members of the public. Six community councils
responded, as did two trade associations: the Association of Scotland’s Self-Caterers, and Isle of Mull
Cottages, a letting agency. All comments have been given equal weighting in this report. 
Draft licensing policy
Respondents were asked whether they had read the draft policy. 95% indicated that they had.
Respondents were asked whether there were any other areas of the draft policy statement or the
proposed additional conditions that they wished to make comments on. 214 responses were made,
covering a wide range of topics. This question duplicated the final question about any other
comments and these responses will be included in the analysis of that section. 
Occupancy levels and children
It is a mandatory condition of a short-term let licence that hosts and operators ensure they do not
exceed the maximum number of guests for their premises. The Council may choose to specify on an
individual licence that guests may bring children under a specified age and these children would not
count towards the occupancy of the premises. Scottish Government guidance states that licensing
authorities may wish to set the age limit as ‘under 10 years’.
The Council had not taken a prior position on this question.
Respondents were asked whether children under the age of 10 should count towards the occupancy
of a premises. 71.3% of respondents considered that they should; 28.7% thought they should not.
Comments in favour of including children in occupancy limits included: 
Comments opposing the inclusion of children in occupancy limits included: 
 Existing insurance policies specifying occupancy and including all ages.
 Fire safety risk assessments do not differentiate occupancy on the basis of age.
 Additional noise from children in flatted premises.
 The sleeping accommodation provided should match the number of occupants.
 We have statutory rules for overcrowding for adults and children in social housing in Scotland.
 Very young children often sleep with their parents and don’t occupy sleeping
accommodation.
 I think as a host we should be able to allow extra children if we feel our homes are not overly
occupied.
 I think age 10 is too high and the age should be more like 3 or 4. I think 2 adults bringing a
baby that will be sleeping in a travel cot (which we can provide) in their bedroom should be
counted as 2 people.
Recommendation:
1. That children under the age of 10 should be included in the occupancy limits for a
premises.
Page 148

Page 149

Page 5 of 29 
Additional conditions
All short-term lets which are granted a licence will be required to comply with a set of mandatory
conditions which apply across all of Scotland. The mandatory conditions are set out in the Order.
The Council has a discretionary power to impose additional conditions for short-term let premises.
Proposed additional conditions
A number of additional conditions were proposed in the draft policy covering specific areas. These
are detailed at Appendix 3. 
Respondents were asked whether they agreed with the proposed additional conditions. The
responses received were as follows: 
Agree Disagree
Antisocial behaviour 487 (89%) 60 (11%)
Noise 474 (87%) 73 (13%)
Waste collection / disposal 453 (84%) 89 (16%)
Failure to maintain common areas 461 (86%) 74 (13%)
Guest safety (bicycles/boat safety/hot tubs/barbecue huts/outdoor
play equipment etc.) 448 (83%) 95 (17%)
Figure 2 Agreement with proposed additional conditions 
Respondents were 4:1 in favour of the proposed additional conditions.
Respondents were asked to provide comments if they disagreed with any of the above points.
Comments included:
Antisocial behaviour (link to condition)
The following comments represent the range of responses received. 
 Antisocial behaviour is NOT within the control of the owner, who is not present during the
guests' stay at the premises, and may live a great distance from the premises. Making the
owner responsible for the control of guests is unreasonable. Should the host 'vet' each guest
to ensure they are of an acceptable standard? Whose prejudices decide what is acceptable? I
don't see this as workable, and there are laws in place already to deal with antisocial
behaviour.
 For noise and antisocial behaviour I think it will be vital for the council to provide clear
advisory steps about what to actually do if guests are accused of this. If a host is not in the
premises or in the area they would value knowing the practical steps, endorsed by the council
and perhaps even the police, about how to proceed.
 I agree with them all. It is important that guests are not anti-social or noisy, whilst the their
safety should be paramount to the landlord.
 In principle I would agree with anti social behaviour and noise, though it may be difficult to
truly control behaviour of others.
 The additional conditions should specifically include the use hot tubs and decking as they
present a very real noise and antisocial behaviour issue for neighbours when used in
residential areas throughout the day and night. This is about the wellbeing of neighbours and
neighbourhoods as well as guest safety.
Page 149

Page 150

Page 6 of 29 
Commentary:
1. This condition is based upon the template additional condition set out in the Part 2
Supplementary Guidance for Licensing Authorities, Letting Agencies and Platforms3 issued by
the Scottish Government.
2.  One of the stated policy objectives set by the Scottish Government in introducing the
licensing of short-term lets is “to address issues faced by neighbours effectively”. The Part 1
Guidance for Hosts and Operators4 includes, at Section 6 “Staying compliant”, a definition of
antisocial behaviour and the measures a licence-holder might wish to take to minimise the
risk of antisocial behaviour from the use of the premises as a short-term let.
3. It should be noted that, in the opinion of the Scottish Government, taking reasonable steps
to minimise the risk of antisocial behaviour is the action of a person who is fit and proper to
provide short-term lets. 
Noise control in flatted premises (link to condition)
The following comments represent the range of responses received. 
3 https://www.gov.scot/publications/short-term-lets-scotland-licensing-scheme-part-2-supplementary-
guidance-licensing-authorities-letting-agencies-platforms-2/
4 https://www.gov.scot/publications/short-term-lets-scotland-licensing-scheme-part-1-guidance-hosts-
operators-2/
 Incidents of anti-social behaviour in self-catering premises are rare. Last year, the ASSC
submitted Freedom of Information requests to all thirty-two local authorities in Scotland and
the results of this show that there is a mismatch between perception and reality: the number
of ASB complaints against holiday lets in Scotland over the past five years is minimal.
 The language attached to the additional conditions by Argyll and Bute Council that the licence
holder must “ensure” that no disturbance or nuisance arises within or from the premises, or
indeed ensure vehicles belonging to guests are parked lawfully, is unreasonable. First, many
operators will not always be on site at their property. Second, while operators can reasonably
ask that their guests comply with the two aforementioned examples but they cannot compel
them to do so. In addition, we are very concerned at the cost implications for Argyll and Bute
Council to enforce this – will the Council have officers patrolling near self-catering units to
check that guest vehicles are parked in an appropriate fashion?
Recommendation:
2. That the additional condition on antisocial behaviour be included in the Council’s short-
term lets licensing scheme, subject to amendment to include specific reference to noise
from amplified music in gardens and external areas.
 Whilst carpets do in some instances provide better sound insulation then cheap laminate
flooring, wooden floors are far more effective at providing a sound proof layer. Our floors
cost over £6000, they have sound proof underlay, over-boarding in ply and solid wood
parquet blocks. The floor will last well over 100 years as is far more environmentally and
sustainable friendly than carpet. Design decisions such as this should be consulted via design
professionals and architects. Effectively you would be asking us to lower the standard of our
apartment both in terms of sound protection and cleanliness. The requirement should state
‘appropriate sound proofing’ and not state ‘carpet’ as a choice of material.
Page 150

Page 151

Page 7 of 29 
 Although I agree with the noise condition I think the requirement for properties above other
dwellings to have carpets does not take account of modern floor coverings such as luxury
vinyl tile which also reduce noise but are much easier to keep clean than carpets. From an
infection control point which is essential following the pandemic I believe options for other
floor coverings should be permitted.
 The flat immediately above our ground-floor flat has been let on a short-term basis.
When refurbishing the flat they removed all carpeting so that noise can be a significant
problem, especially when young children are running around late at night. The use of kitchen
and laundry equipment at night is also magnified.
 0700 departure is too late to connect with certain ferry sailings.
 I agree with added conditions but 23.00 hours is far too late to impose restrictions on garden
noise, 22.00 at latest.
 The additional conditions should specifically include the use hot tubs and decking as they
present a very real noise and antisocial behaviour issue for neighbours when used in
residential areas throughout the day and night. This is about the wellbeing of neighbours and
neighbourhoods as well as guest safety.
 The few flatted properties [on Mull] would find it difficult to prevent guests leaving before
7am, as many guests leave on early ferries to either return home or catch a connecting ferry
to a second island destination.
 We are living in a ground floor flat and suffer badly from noise (footfall and voice) from the
flat above who let it out on short term lets already. I hope that when these owners apply for a
licence, somebody will check that appropriate floor coverings are in place.
 Should not be permitted in flats where poor insulation is present. Noise is ever present and
occupancy is unpredictable. I personally experience a very poor quality of life when an
upstairs flat is occupied. The configuration of our building means that their kitchen is above
my bedroom. I get no sleep if they’re not sleeping.
Commentary:
Impact noise
1. Consultation responses make it clear that impact noise in flatted premises causes
considerable disturbance to residential occupiers beneath short-term lets.
2. The draft additional condition including a requirement for carpeting in flatted premises is
based upon a template condition in the Part 2 Guidance. The purpose of the condition is to
reduce “tapping” impact noise from people moving around on hard-surfaced floors, typically
floorboards or poorly-installed laminate flooring. This is a known cause of annoyance
between dwellings that have a party floor or ceiling.
3. The components of impact noise can be characterised as “thumping” and “tapping”.
Thumping noises are typically from heavy impacts such as dropping items or persons running
or jumping, as children in play might do. Tapping noises are generated typically by the
impact of hard objects on hard floors, such as stiletto heels on tiles or floorboards.
4. Although there are performance standards for impact noise specified in the Building
Standards Technical Handbook, Part 5.1, it is expensive and complex to carry out acoustic
testing in accordance with BS EN ISO 140-7: 1998 and BS EN ISO 717-2: 1997, the standards
for impact sound transmission. In addition, testing requires the co-operation of the
occupiers of the premises below the premises in question. Note that testing to these
Page 151

Page 152

Page 8 of 29 
standards requires the removal of carpets to assess the performance of the underlying floor
structures.
5. It is not generally practicable to achieve the performance standards set out in Part 5.1 of the
Technical Handbook by only treating the floor in one premises; the whole party floor/ceiling
structure requires to be constructed in accordance with the Part to achieve the necessary
performance.
6. Some short-term let premises will have been provided by conversion into flats of pre-
existing dwellinghouses or as new constructions. In these cases, compliance with the
standards in Part 5.1 will have been required in order to obtain a building warrant and
completion certificate. There is a case for accepting a completion certificate in respect of
these premises as an alternative to requiring carpeting in specified areas of the premises.
7. A suggested exception to the requirement to carpet floors in accordance with the template
additional condition is “any flatted property that can demonstrate that they have been built
to or been converted to Domestic Technical Standard 5.1, may be exempt the requirement
to carpet floors”.
8. The simple alternatives to excepting premises built to Domestic Technical Standard 5.1 are:
(a) don’t include the additional condition and deal with complaints or objections on their
own merit; or (b) include the condition and require carpets in all relevant cases.
Guest arrival and departure
9. The comments regarding early and late ferry travel are noted. The Council fully understands
the realities of island travel and will apply a reasonable interpretation of this condition in the
event of complaints being received. The Council does not consider that people leaving
premises before 0700 in order to catch an early ferry for their onward travel would be in
breach of this condition.
Antisocial noise from gardens
10. The comments on garden noise and noise from the use of hot tubs are noted. The Council
considers that these issues should be addressed by the host’s house rules for the prevention
of antisocial behaviour rather than a generally-applied additional condition. 
Littering and waste disposal (link to condition)
The following comments represent the range of responses received. 
Recommendations:
3. Give further consideration to the need for the impact noise condition and, should it be
considered necessary, whether an exception should be made for constructions which are
compliant with the Domestic Technical Standard 5.1.
4. Amend the antisocial behaviour condition to make specific reference to the avoidance of
disturbance from the playing of amplified music in gardens or external areas.
 Experience has shown varying standards by guests with regard to recycling. Our policy is to go
through waste material to ensure correct segregation of items
 Waste/recycling bin presentation for collection should not be a guest responsibility, it should
be managed by permanent owners/tenants in the building.
Page 152

Page 153

Page 9 of 29 
Commentary:
1. The draft additional condition is taken from the template condition in the Part 2 Guidance.
2. It is noted that waste from secondary letting premises should be treated as commercial
waste and have commercial waste contracts in place. Where commercial waste receptacles
are provided in common areas, guests will require to know which are the correct receptacles
for the premises they occupy.
3. The condition is worded to place an onus on a licence holder to provide advice and
information to guests. The condition does not require guests to put waste receptacles out
for collection, only that the licence holder shall make arrangements for that to happen; in
some cases, it may be appropriate to ask the guest to make sure the bins are presented for
collection. 
Damage to property (link to condition)
The following comments represent the range of responses received. 
Commentary:
1. This is a template condition taken from the Part 2 Guidance.
2. This condition does not prohibit keyboxes, nor other devices, and the sole owner of a
property requires nobody else’s permission to affix one.
 I agree with waste disposal and recycling notices but I find the guests sometime put
everything in the green bins which I then take out and put in the blue .
I don’t think it should be the guests onus to put the bins out , that’s the owners .
 The Council again state the licence holder shall “ensure” – while operators can advise guests
of refuse collection day, they cannot compel them to comply. On a more practical point, we
are dealing with individuals in the region for a holiday and who will not wish to spend a large
amount of time familiarising themselves with waste management and recycling issues.
Recommendation:
5. That the additional condition on littering and waste control be included in the Council’s
short-term lets licensing scheme.
 Prohibiting the use of keyboxes or other related devices would be an arbitrary approach.
First, it should be recognised that keyboxes are used for a variety of different purposes, not
just to facilitate entry to a short-term let – for example, they are readily utilised by carers. We
would presume that Argyll and Bute Council have no issue with keyboxes for this purpose but
why should it be any different for short-term lets? It is the same device affixed to a door used
to enable entry.
 Securing the agreement of all owners within a property will be near impossible to achieve.
Unanimity of agreement for any change to a property (e.g., repairs) is difficult to secure in
other contexts but would be especially so for keyboxes used by short-term let operators. We
therefore ask the following: will this become a general policy for all keyboxes within the local
authority area, or do Argyll and Bute Council intend to solely discriminate against their use by
short-term let operators?
 The flat immediately above our ground-floor flat has been let on a short-term basis.
the owners installed a key safe outside our secure block without permission.
Page 153

Page 154

Page 10 of 29 
3. No one person has the right to cause damage to public infrastructure or jointly-owned
property without the consent of the owner(s). 
Additional conditions for guest safety
Comments were received in relation to the various proposed additional conditions for guest safety
as set out below.
 A fit and proper person should be attending to these items as a matter of course, I think more
compliance is unnecessary
 Additional moveable facilities are beyond what this policy should be covering. All of this kind
of gear should be used at own risk and if there is an issue either parties’ insurance should be
the first port of call.
 Bicycles should be at the users own risk, as should boats...
 Guest safety is the concern of th guest and they would or should have insurance to cover thsi.
this should only apply if the equipment is provided by the host.
 I absolutely agree !
 I am sure I am out of step with would prefer that our own equipment/facilities can be
provided to guests at no additional cost, when done so explicitly at those guests own risk. Our
property is very remote and a requirement to inspect bikes between each guests, supervise
inflatable play equipment (why can't guests do this themselves?), etc. is especially
burdensome when we have to pay travel costs for someone to do it. The end result will be
that we do not allow guests to use such things, which is not what guests would want so it's
hard to see who this benefits.
 I believe the additional conditions are unnecessary as cabin owners such as myself are already
responsible and liable for health and safety issues within our properties, eg hot tubs.
 I somewhat disagree with the guest safety - boats, bbqs etc need to be safe. Some however is
user responsibility.
 It is the responsibility of the person renting to make sure they are safe
 These Sports items in Guest Safety are supplied with "at your own risk" on the site.
 None of these examples are a genuine problem in this area.
 This will be difficult to monitor regarding things like bikes but appropriate for hot tubs etc
 Very well thought out
Commentary:
1. All of the matters addressed in the additional conditions for guest safety represent topics
which have required enforcement intervention from the Environmental Health service in the
holiday let sector.
2. Anyone providing facilities for the use of other persons will be liable at common law if injury
results from their use if they have failed to exercise reasonable care to ensure the safety and
proper maintenance of those facilities.
3. Additionally, the operation of a holiday accommodation business is an undertaking for the
purposes of the Health and Safety at Work etc. Act 1974, with statutory duties imposed
upon the operator to conduct the undertaking in such a way as to ensure, so far as is
Recommendation:
6. That the additional condition on damage to property be included in the Council’s short-
term lets licensing scheme.
Page 154

Page 155

Page 11 of 29 
reasonably practicable, that he and other persons (not being his employees) who may be
affected thereby are not thereby exposed to risks to their health or safety.
4. A licence holder cannot contract out of their health and safety or common law duties using
unfair contract terms such as “use at your own risk”.
5. The mandatory conditions include requirements to evidence compliance with other
statutory duties such as gas safety.
6. Guests are entitled to assume that short-term let accommodation and the facilities provided
for them are safe. This is a policy aim of the licensing scheme.
7. Overall, 83% of respondents who indicated a preference supported the inclusion of
additional conditions for guest safety. 
Temporary exemptions
Proposal not to grant temporary exemptions
543 responses were received to this question.
425 respondents,78% of the total, agreed with the Council’s position not to grant temporary
exemptions. 118 respondents, 22% of the total, disagreed.
The following comments represent the range of responses received. 
Recommendation:
7. That all of the proposed additional conditions for guest safety should be included in the
Council’s short-term lets licensing scheme and applied to the premises which offer the
specific facilities to guests.
  Why should other short term let hosts be given special dispensation when they could be just
wanting to make some quick cash from a one off event and in the process not have to follow
the rules of safety etc that other hosts have to abide by..? I do not agree with this.
 What about music festivals on the islands, where there is a need for short term
accommodation with an influx of visitors for a few days. This attempt to 'maintain standards'
will kill local flexibility and initiative.
 We live on a small island and sometimes there is simply not enough accommodation for
visitors during major events. We rely heavily on tourists to support the local economy.
During these events, I think temporary exemptions would be valuable for the community.
However, 6 weeks could be reduced to 3 weeks as I'm sure that would be enough to cover
popular events on Mull.
 we live in a remote and rural area with limited accommodation - there will be events,
festivals, weddings, emergencies etc. in the community which generate extra temporary
accommodation requirements that cant be met if there is no facility for temporary
exemptions - need to keep the doors open and the economy functioning as well as
communities flourishing so havingsome leeway with a temp exemption is a necessity.
 There may be times when temporary extensions are vital for locally run events such as Tiree
Music Festival. In a region where lots of places don't have hotels the need to be able to offer
flexible accommodation for short periods is vital. Prices at the moment are THROUGH THE
ROOF - I know lots of people who want to visit Scotland at the moment who are put off by the
costs and not coming. That hurts us all.
Page 155

Page 156

Page 12 of 29 
 The Scottish Series is TARBERT’s sole nationally significant Tuscan sailing fixture. If you
proceed, you will prevent it continuing. QED
 The fees charges and the red tape that goes with it could be seen to be too great , that it
would discourage home owners in sharing their home. For short periods up to 6 weeks better
to advertise , what is expected of home owners for 'Home sharing'. There are not many
events in Argyll I can immediately think of, perhaps the Cowal games in Dunoon or any large
sporting event that may come into Argyll eg 'Tour of Britain'.
 We do not agree with the Council’s approach to not grant any temporary exemptions. This
approach is said to be because “the licensing regime is intended to ensure that premises are
safe to let, and exemptions may reduce standards”. For the Council to conclude at this stage
that a temporary exemption “may” reduce standards is entirely premature. In enacting the
2022 Order, the Scottish Government put in place the licensing scheme to ensure basic safety
standards are in place across all short-term lets operating in Scotland. In allowing for the
principle of temporary exemptions, the Scottish Government must have been satisfied that a
temporary exemption would not reduce basic safety standards (since, were it otherwise, the
Scottish Government would not have permitted local authorities to grant temporary
exemptions). In terms of paragraph 1A(3) of Schedule 1 to the 1982 Act, it will also be open
to the Council to attach conditions to any exemption granted, and which would permit the
Council to attach such conditions as it felt necessary in connection with safety matters.
We believe that the Council should enable temporary exemptions to cover major sporting
events, major international events, festivals and first-time operators trying out short-term
letting for the first time.
Short-term lets provide additional accommodation during important times of the year, e.g.
the summer festivals. Argyll and Bute Council need only look to a nearby local authority in
Glasgow to see how short-term lets allow a city to tackle capacity issues and host a major
event. 30,000 delegates, officials, and observers were expected at COP26 in the city; yet
Glasgow’s hotel capacity is only 15,000. To ease the supply of accommodation, Airbnb offered
first-time hosts a £100 bonus to welcome delegates.
 I think they should have to apply for a full licence for the correct fee instead of a temporary
licence for what will probably be a reduced fee. I also think this would give short-term let
owners the opportunity to rent out the property in quieter seasons to locals then evict the
renters from their home in order to set up a short-term let for the busier seasons which I
consider immoral.
Commentary
1. The responses from small island communities in particular highlight the role that local
people have in taking guests into their homes during significant local events, such as the Jura
Fell Race, the Tarbert Series or the Cowal Games, where the normal supply of
accommodation cannot meet the demands. Many of these events are of considerable
economic, social and cultural significance, not only to the individual islands or towns, but to
the wider Argyll and Bute economy.
2. Temporary exemptions would meet the need for one-off home-letting or home-sharing
arrangements, but could not meet the need for accommodation to be provided outwith a
single specified period of six weeks in any 12 month period. This is a feature of the law and is
not a matter for discretion on the part of the Council.
3. Temporary exemptions clearly have a role to play in supporting local events and local
economies, particularly on the islands. However, they have structural limitations.
Page 156

Page 157

Page 13 of 29 
4. There is a risk to the stability of the residential letting market if landlords are able to evict
tenants for the summer season simply to extract greater income from tourists and visitors.
This is widely considered to be an economic and social vice in Edinburgh with its summer
festivals and St Andrews with the annual golfing tournament. 
Should additional conditions apply to temporary exemptions
417 respondents, 82% of the total, considered that the additional local conditions should apply to
any temporary exemptions. 94 respondents, 18% of the total, considered that they should not. The
following comments represent the range of responses received. 
Temporary licences
Should the Council introduce temporary licences
329 respondents, 62% of the total, agreed that the Council should introduce temporary licences. 204
respondents, 38% of the total, disagreed.
Reasons why they should not be introduced included: 
Recommendations:
8. That the Council provides for temporary exemptions to be made available within Argyll
and Bute.
9. That a temporary exemptions policy statement be developed and published in
accordance with the Part 2 Guidance.
10. That any temporary exemptions policy shall protect private tenants from eviction,
disruption and abuse.
 Would be totally impractical - could use a small number of common sense provisions.
 You either have a licence or you don't. Short term exemptions will be difficult to manage, and
open to abuse.
 Yes if its possible to implement, but this might not be practical if the exemption is just for a
short amount of time
 Why wouldn’t you make them comply to the same standards etc
 Keep the licences as simple as possible.
 To ensure that premises are safe to let, standards are maintained and local residents are
protected from unregulated lettings.
 If there is an exemption then it makes no sense that any licence conditions should be applied.
 Those letting such premises for whatever reason or length are still benefitting by receiving an
income from their business therefore they should havecto comply at all times to the
regulations
 I don’t think additional local conditions should apply to either exemptions, a full licence or a
temporary one.
Recommendation:
11. That further consideration should be given to which, if any, additional local conditions are
applied to temporary exemptions.
 Why would anybody need a temporary licence
 Why is there a need for a temporary licence. Just wait until you get a licence
Page 157

Page 158

Page 14 of 29 
Commentary:
1. Many respondents conflated the issues with temporary exemptions with this question about
temporary licences.
2. A temporary licence cannot be used to circumvent the application process for a new host,
who cannot let the premises until their full licence has been granted.
3. It has been brought to the Council’s attention that the sale of letting property on an ongoing
concern basis requires a transitional arrangement to ensure the continuity of the business
and to protect guests’ previously-booked accommodation and travel arrangements. The law
provides that a licence is specific to a licence holder and a premises – it is not transferrable.
Therefore, there is a role for a purchaser to apply for and hold a temporary licence to ensure
the continuity of a letting business whilst the purchase of a property is completed and until a
full licence application can be determined.
If temporary licences are introduced, should additional local conditions apply
Respondents who answered this question were 80% in favour of applying the additional local
conditions to any temporary licence. 
Fees and charges
Different scales of fees for home sharing and home letting licences compared with
secondary letting licences
365 respondents, 67% of the total, agreed that there should be a lower fee for home sharing or
home letting licences compared with secondary letting licences. 176 respondents, 33% of the total,
disagreed.
The following comments represent the range of responses received. 
 Temporary licences would not be subject to full scrutiny as a full licence application would,
and properties may not meet the health and safety requirements that are expected of fully
licenced properties. Temporary licences may be used to test the viability of commercial
letting, potentially prematurely removing a property from permanent occupation.
 Temporary licences can provide a way for licensing authorities to allow new hosts and
operators to both trial the concept of short-term letting for up to six weeks as well as to start
taking guests whilst their licensing application is being considered. There is no risk to the
Council in proceeding in this manner for temporary licences given that hosts and operators
must still comply with all of the mandatory conditions.
Recommendation:
12. That the Council develop a temporary licences policy, setting out the specific circumstances
to be considered and the criteria to be applied to any temporary licence.
 You have not detailed what the fees are going to be, so I cannot give an objective answer to
say whether this banding is a fair reflection of the fees.
The UK Government's Code of Practice on Consultation states under Citerion 3: Clarity of
scope and impact Consultation documents should be clear about the consultation process,
what is being proposed, the scope to influence and the expected costs and benefits of the
proposals.
Page 158

Page 159

Page 15 of 29 
 While the weightings are in in the right direction, A&B Council should work to mitigate the
myriad negative impacts of the STL order through minimised/progressive fee structure (free
for home share applicants, much higher for commercial operators of multiple secondary lets)
and a ultra light handed approach to applications and compliance (approve most applications
automatically with rudimentary checking to minimise administration burden on the council –
there is no significant STL problem in A&B now so there is no problem to fix). The council
must publish its proposed fees as part of this consultation as other authorities have and
extend the consultation period accordingly
 Weighting is too lenient on secondary lets. I would suggest a secondary, short term let be
weighted at least 4x more than home sharing or letting due to the impact that secondary lets
have on availability of accommodation for people who wish to live and work on Mull
 Usually I let my chalet to groups of 4 people but, occasionally, a group of 5 wants to stay - this
is usually families with 3 children. To keep my costs reasonable I allow the 5th guest at a
nominal charge. If I’m going to pay extra for having 5 guests rather then than 4, I’m going to
have to pass this cost on to all my guest groups which will be unfair to the majority.
I think the second category should be 3 - 5 guests.
 You have to realise that guests love to get together under one roof in a lovely area and share
happy times and create happy memories. It seems to me that when considering holiday lets
the happiness they create for guests is not part of the consideration. If the fees are too high
then hosts will close down the property or certainly restrict the number of guests. please also
understand that although a property can cater for 6 many times there are two or four people
as guests. If you make the fees too high then I would just reduce my capacity to 4 and tbh
probably earn the same amount of money per week.
 There are too many bandings and they do not account for the typical family size of 2 adults
and 2 or 3 children (and multiples where families might holiday together). A simpler set
would be 1-2, 2-5, 5-10, >10.
Moving to more that 2x is excessive, and becomes a tax rather than an administration charge.
Fees – the licence fee should be proportionate to/capped against the average weekly letting
rent (as advertised) of the premises (to avoid unfairly penalising low cost locations).
 There appears to be a bit of a ramp here. I don’t accept that there is more work per head for
most applications. The aim of this exercise needs to be to improve standards for users and
promote better neighbourliness. As it stands it looks like something the council has been
forced to do and is determined to make money out of. Most, if not all of the checks required
can be addressed by the provision of documentation signed by competent people - which can
be checked by sample if required.
 The fees for home sharing in respect of two to four guest accommodation should be
materially lower than for other types of licence as this size of business already suffers
disproportionately from high running costs as a percentage of revenue. It is also unlikely that
small home sharing businesses will be a cause of the issues this legislation is aimed at
controlling.
 the differential between an average let of 3-4 people and 1-2 is too high - it is a reduction of
only 20% when the next uplift to 5-8 is 50% - puts increased pressure on very small business
in 1-2 market where there is not the same opportunity to recoup costs through a higher
rental income - additional costs are being incurred not just through licence fee but also
various testing certificates, and increased energy and cost of living prices. the 1-2 market is
often the pensioner market and this licensing regime is going to make the costs of holidays
much more expensive for a segment of the market on which Argyll is highly reliant.
Page 159

Page 160

Page 16 of 29 
 The band 5-8 covers 3 and 4 bedroom houses. 3 bed with 6 people is a totally different
impact on the community than 8 people in one house. There should be a band that covers 5 -
6 at maybe 1.25 times (Secondary let) and then 7-8. You are grouping this wrongly and tarring
a 3 bed with a capacity for 6 people in the same group as a large property with 8 people.
 Should be higher for secondary let license. Holiday let's should be small houses or part of a
house like an annex etc. Put high fees to stop people buying a 4 bed house and letting it out
to tourists.
 Someone with a property sleeping 4 on band 3-4 may have 4 adults plus two children under
10, if children are not counted it still takes the occupancy up to 6 are the children sleeping on
a sofa bed? Whereas someone on band 5-8 (but with a maximum occupancy of 6) may also
have 4 adults and two children. How will the council differentiate between the two bands if
children are not counted?
Properties sleeping 4-6 are the most suitable for families.Therefore I think the banding should
be 1 to 3, 4 to 6, 7 to 8 then 9 to 12 and so on for fairness.
 Should be based on SAA business rates which is number of usable beds. Max occupancy has
to be for usable beds in bedrooms. No sofa bed’s allowed
 Secondary letting is more of an issue when it comes to availability of housing. If you live in a
house that is your home and let a couple of bedrooms, you are not affecting the housing
situation in any way as you're already occupying the property. Secondary letting (a) makes far
more money so owners can afford a higher fee; (b) adversely affects availability and
affordability of housing in rural/island areas; (c) is far more likely to cause anti-social
behaviour as the owner isn't on the property (and is sometimes hundreds of miles away,
relying on an agency to do the paperwork). Therefore, secondary let licences should be
charged at a much higher rate.
 Noise and antisocial behaviour escalates steeply the larger the group. I would suggest the
starting point for a fee structure should be 1 with the tariff increasing geometrically for each
capacity grouping.
 No. I am a home-share with 3-4 guest capacity and there's no way I should be paying almost
the same as a second home or 'investment property' of the same size. 1-2ppl 0.5 and 3-4ppl
0.6 is fair.
 I can understand the logic of large properties - eg 20 plus - but i dont agree that say an 8 bed
property (4 bedrooms) will entail more work and enquiries than a 4 bed (2 room) property.
 home sharing/home letting should not be treated differently than secondary letting, the same
rules apply to each
 home sharing, home letting and secondary letting should all be weighted in the same way,
there should be no reduction for home letting and home sharing,
 Currently any B&B / Guest House which accommodates 6 or less people does not / cannot
apply to be treated under the business rate regime, therefore the banding should reflect this,
potentially 1 to 6 guest capacity should weighted 0.6 - 0.7 with capacity 6 - 8? weighted 1
with higher capacities weighted according to the proposed table
 - Secondary letting; I think the bands are too narrow and therefore adding to the costs of
running the scheme - I would advocate multiple of 6's.
Commentary:
1. This part of the consultation attracted the most comments. Many respondents expressed
concern that the actual level of fees were not indicated. Whilst this is regrettable, and the
Council recognises that this information is very important to the sector, the costs of
Page 160

Page 161

Page 17 of 29 
delivering the function were not available at the time of issuing the consultation and
therefore indicative fee levels could not be provided.
2. The principles of fee-setting are laid out in Section 3 of the Part 2 Guidance. These are:
 that fees are set on a cost-recovery basis considering the overall cost of delivering the
function;
 that local authorities’ areas vary considerably and that that the costs of delivering the
function, and therefore the fees determined, will vary from local authority to local
authority; and
 that local authorities review their fees from time-to-time to ensure that the revenue
from fees remains in line with the running costs of the licensing scheme.
3. The Scottish Government expects local authorities to seek to minimise costs through
economies of scale, integrated service delivery where possible, minimising visits to conduct
enquiries as part of the licensing process, and taking a proportionate approach to the use of
visits as part of the checking and verification process.
4. It is clear that the costs of travel to remote parts of the Council’s area and the islands is
greater than travel in smaller, mainland, authorities. The Part 2 Guidance permits local
authorities to determine a fee structure that would charge the costs of visits for routine
licensing purposes over and above the basic application fee. The Council does not propose
to do this because (a) this could lead to disputes about the necessity of visits and (b) would
disproportionately disadvantage hosts and operators on islands where the actual costs of
visiting a site could be considerably more than the cost of the licence, particularly when
travel delays would have to be costed and recovered. For these reasons, and to conform to
the Council’s policy of delivering the same standard of service to all parts of its area, the cost
of necessary visits to check and verify licence applications is intended to be recovered across
all licence applications as part of the cost of the function.
5. Some respondents raised the question of whether renewal fees could be nominal. At
present, the proposed fees for renewing a licence are the same as for a new application, on
the basis that the applicant requires to provide similar information as for a new licence and
the processing demands are equivalent. It is open to local authorities to consider a
subscription in place of the renewal fee, should they wish to do so. This is an option that will
be considered when fees are reviewed in three years’ time, ahead of the first renewal cycle.
Differential fees for home letting or home sharing compared with secondary letting
6. Note that The Scottish Government recommend that local authorities, at a minimum,
establish a licence fee structure that takes account of the following:
 the type of licence with lower fees set for home sharing and home letting licences than
for secondary letting licences; and
 guest capacity in terms of the maximum number of guests, as requested by the host or
operator on their application form. Note that some licences will be for premises
including significant numbers of unconventional accommodation, such as pods or lodges
on the same site where a caravan site licence is not otherwise required.
Page 161

Page 162

Page 18 of 29 
7. There was general agreement with this proposed approach, although concerns were raised
specifically about the bandings and the weightings to be applied to fees. These points are
discussed in more detail below.
The proposed fee structure
Bandings
8. The bandings proposed were based upon the Scottish Government’s example banded fee
structure set out in the Part 2 Guidance, with two bands merged.
9. It is clear from the consultation responses that:
a. The bands are too narrow, and
b. The “standard” secondary let premises should be regarded as a three-bedroom
property that can sleep 6 persons, including children under the age of 10 years.
Weightings
10. There was broad support from respondents for the weighted approach to setting fees,
although there was a wide range of opinion on the actual applied weighting values.
11. Respondents challenged the Council’s assertion in the draft policy statement that larger
secondary letting premises would necessarily attract more objections and representations,
or require more work to process their applications. The Council considers that larger
premises are more likely to require physical site inspections as part of the application
determination process compared with smaller, more conventional, premises and therefore
an increased fee is proportionate and appropriate.
12. The assessment of larger premises, accommodating more than, say, 12 persons will probably
bear comparison with the assessment of similar-sized houses in multiple occupation. 
Other comments received in the course of the consultation
Other comments received in the course of the consultation were focussed on the following areas:
1. That the licensing scheme was unnecessary.
Comment: This is a statutory scheme which the Council is required to implement in
accordance with the Order and the guidance issued by the Scottish Government.
2. That the financial circumstances of many short-term let business were fragile and that the
licensing scheme would drive some operators out of business.
Recommendations:
13. That home letting and home sharing licences should generally attract a lower application
fee than applications for secondary letting licences.
14. That the proposed bandings be reviewed to reduce them in number and to standardise
against a three-bedroom, six-person-accommodating premises.
15. That a further review of the weightings be conducted to prepare a final banding and
weighting model, based upon best evidence and reasonable assumptions.
Page 162

Page 163

Page 19 of 29 
Comment: These are policy matters which are the responsibility of the Scottish Government,
which introduced the licensing scheme in its present form after wide public consultation and
in consultation with the trade and other interested parties.
3. That very small premises should be exempt from the scheme.
Comment: The scope of the scheme is defined in stature and the Council is required to
implement it in full.
4. That home-share businesses, e.g. guest houses which pay non-domestic rates, should be
exempt from fees.
Comment: The guidance from the Scottish Government already advises that home share and
home letting businesses should be charged a lesser fee than secondary letting businesses.
Additionally, premises accommodating fewer persons are expected to be charged a lesser
fee than premises accommodating larger numbers of persons.
5. That the licensing scheme should be used to control the numbers of premises in use as
short-term lets in specific locations due the removal of houses from the private rental sector
and making housing less affordable for local people seeking to live and work in their home
communities.
On this point, one respondent commented: 
Commentary:
The licensing scheme per se cannot be used to control the numbers of short-term lets in any
particular locality. Excepting objections and representations, every application must be assessed on
two grounds only: whether the applicant is a fit and proper person to hold a licence, and whether
the applicant can meet the licensing conditions. The control of conversion of dwellinghouses to
short-term let use is a planning matter5. Either the Council or the Loch Lomond and The Trossachs
National Park may determine in the future to create one or more short-term let control areas under
planning legislation. This would require any new applicant to demonstrate that planning permission
had been obtained for the use as a short-term let before an application could be considered. At the
present moment, neither planning authority has determined to do so within the area of Argyll and
Bute Council. 
5 Planning Circular 1/2021: Establishing a Short-Term Let Control Area
 I … believe short-term lets are one of the main causes for Oban's housing crisis and they
have been allowed to take advantage and have it easy for too long when there are
families and local working professionals struggling to find suitable accommodation
because of people (some of whom don't even live in the area) who have bought
properties that should be accessible homes and converted them into business
opportunities for their own personal gain.
I haven't given a postcode because I don't have a home of my own due to the level of
short-term let properties there are - it really restricts the accessibility to housing in the
area, which I grew up in. While I was growing up, Oban was a community driven town and
it appears to have been consumed by tourism to the point that visitors to the area are
significantly prioritised more over the people who live here. There should be a fair
balance between tourism and community.
Page 163

Page 164

Page 20 of 29 
Other responses received in the course of the consultation raised technical issues in relation to the
application of the licensing scheme, or which type of licence would be required in particular
circumstances, the application to caravan sites and chalet parks, and the need for comprehensive
guidance to assist applicants in getting their application right first time.
Commentary:
All of these points are recognised and many are actually addressed in the Part 1 Guidance for hosts
and operators. The Council recognises that there are unconventional offers of short-term let
accommodation and there will be a facility for applicants to make enquiries of the Regulatory Service
Licensing team in advance of completing their application. Licensed caravan parks are exempt from
short-term let licensing in respect of the licensed caravan units. The Council considers that the great
majority of applicants will be able to identify which licence applies to their business. The Council is
committed to making the application process as straightforward as possible; both in the interests of
applicants and reducing the costs of dealing with invalid applications.
To conclude, in the words of one respondent:
 “(1) You can’t please everyone. (2) Try to keep it consistent and simple.” 
Page 164

Page 165

Page 21 of 29 
Appendix 1 – Summary of recommendations
1. That children under the age of 10 should be included in the occupancy limits for a premises.
2. That the additional condition on antisocial behaviour be included in the Council’s short-term
lets licensing scheme, subject to amendment to include specific reference to noise from
amplified music in gardens and external areas.
3. Give further consideration to the need for the impact noise condition and, should it be
considered necessary, whether an exception should be made for constructions which are
compliant with the Domestic Technical Standard 5.1.
4. Amend the antisocial behaviour condition to make specific reference to the avoidance of
disturbance from the playing of amplified music in gardens or external areas.
5. That the additional condition on littering and waste control be included in the Council’s
short-term lets licensing scheme.
6. That the additional condition on damage to property be included in the Council’s short-term
lets licensing scheme.
7. That all of the proposed additional conditions for guest safety should be included in the
Council’s short-term lets licensing scheme and applied to the premises which offer the
specific facilities to guests.
8. That the Council provides for temporary exemptions to be made available within Argyll and
Bute.
9. That a temporary exemptions policy statement be developed and published in accordance
with the Part 2 Guidance.
10. That any temporary exemptions policy shall protect private tenants from eviction, disruption
and abuse.
11. That further consideration should be given to which, if any, additional local conditions are
applied to temporary exemptions.
12. That the Council develop a temporary licences policy, setting out the specific circumstances
to be considered and the criteria to be applied to any temporary licence.
13. That home letting and home sharing licences should generally attract a lower application fee
than applications for secondary letting licences.
14. That the proposed bandings be reviewed to reduce them in number and to standardise
against a three-bedroom, six-person-accommodating premises.
15. That a further review of the weightings be conducted to prepare a final banding and
weighting model, based upon best evidence and reasonable assumptions.
Page 165

Page 166

Page 22 of 29 
Appendix 2 – Consultation questionnaire
Full name
Postcode
Email address
Which of the following apply to you?
o Short-term let host/operator
o Short-term let guest
o Short-term let neighbour
o Other member of the public
o Community Council
o Trade association (please specify)
o Other (please specify)
Draft Licensing Policy
Have you read the draft policy?
o Yes
o No
Are there any other areas of the Draft Policy statement or the proposed additional
conditions that you wish to make comments on?
o Yes
o No
Occupancy levels and children
It is a mandatory condition of a short-term let licence that hosts and operators ensure they
do not exceed the maximum number of guests for their premises. The Council may choose
to specify on an individual licence that guests may bring children under a specified age and
these children would not count towards the occupancy of the premises. Scottish
Government Guidance states that Licensing Authorities may wish to set the age limit as
‘under 10 years’.
Should children under the age of 10 count towards the occupancy of a premises?
o Yes
o No
Please state your reasons
Additional conditions
All short-term lets which are granted a licence will be required to comply with a set of
mandatory conditions which apply across all of Scotland. The Council has a discretionary
power to impose additional conditions for short-term let properties.
The Council has proposed a number of the additional conditions covering a number of
specific areas. These are attached in the Appendix to the consultation. Do you agree with
the proposed additional conditions?
Page 166

Page 167

Page 23 of 29 
Agree Disagree
Antisocial behaviour ○ ○
Noise ○ ○
Waste collection / disposal ○ ○
Failure to maintain common areas ○ ○
Guest safety (bicycles/boat safety/hot tubs/barbecue huts/outdoor
play equipment etc.)
○ ○
If you disagree with any of the above points please state your reasons.
Should other areas/issues be covered by additional controls?
o Yes
o No
Should any of the proposed additional conditions be applicable to certain types of short-
term licences (i.e. secondary letting, home letting or home sharing or certain types of
properties?
o Yes
o No
Please provide details and reasons.
Temporary exemptions
The Council has the option to grant temporary exemptions to the requirement to have a
licence for a period of up to 6 weeks which would need to be applied for. This could be to
allow a large influx of visitors over a short period for a particular event.
The Council is not proposing to consider applications for temporary exemptions because the
licensing regime is intended to ensure that premises are safe to let, and exemptions may
reduce standards.
Do you agree with the approach to not grant temporary exemptions?
o Yes
o No
If temporary exemptions to a licence are introduced, should the additional local conditions
apply?
o Yes
o No
Please provide reasons for your answer.
Temporary licences
The Council has the ability to grant temporary short-term let Licences for a period of up to 6
weeks, or longer if an application has been made for a full licence. Please note that in
applying for a temporary licence full compliance with mandatory conditions is necessary.
Do you think the Council should introduce temporary licences?
o Yes
o No
Page 167

Page 168

Page 24 of 29 
If temporary licences are introduced, should the additional local conditions apply?
o Yes
o No
Please provide reasons for your answer.
Fees and charges
Licensing authorities can take account of the size of premises, number of guests and type of
premises in setting a banding structure for its fees. The Council are considering the following
principles.
1. That there will be a lower fee for home sharing and home letting licenes (e.g. B&B etc.)
rather than secondary letting (holiday homes etc.). This reflects the position that the
owner lies within the properties for home lets or shares and has a greater degree of
control.
Do you agree with this position?
o Yes
o No
2. A fees structure based on the following bandings, increasing with the number of
occupants. The fee charged will be weighted according to the following factors, where
the unit fee is the cost of dealing with a non-controversial application for a 4-person
secondary let licence. Applications for premises with larger number of guests are likely
to require more enquiries, or attract more representations, or objections, which require
to be dealt with as part of the application. 
Guest capacity
(People)
Home sharing and home
letting licence
Secondary let licence
1 or 2 0.6 0.8
3 or 4 0.8 1.0
5 to 8 1.0 1.5
9 to 12 1.5 2.0
12 to 20 2.0 4.0
21+ 4.0 8.0
Do you agree with the bandings and weightings as presented in the table?
o Yes
o No
Please detail any other comments you have on the short-term let licensing regime.
Page 168

Page 169

Page 25 of 29 
Appendix 3 – Proposed additional conditions
Additional conditions based on Part 2 Guidance
Antisocial behaviour
1. The licence holder must take reasonable steps to manage the premises in such a way as to
seek to prevent and deal effectively with any antisocial behaviour by guests to anyone else
in the short-term let and in the locality of the short-term let.
2. The licence holder must take reasonable steps to:
 Ensure that no disturbance or nuisance arises within or from the premises, for
example by explaining the house rules to the guests;
 Deal effectively with any disturbance or nuisance arising within or from the
premises, as soon as reasonably practicable after the licence holder is made aware
of it; and
 Ensure that any vehicles belonging to guests are parked lawfully, for example
explaining where any designated parking spaces are to be found and highlighting
any local rules.
Privacy and security
1. The licence holder must manage the premises in such a way as to respect and protect the
privacy and security of neighbours.
2. The licence holder must ensure:
 Guests know and understand any particular rules applying to shared areas and
entrances;
 Guests understand that shared doors should be properly and securely closed after
use; and
 The provision of access codes or keys to guests cannot be used by guests to gain
access to shared areas after they have finally departed.
Noise control in flatted premises
1. Where the premises are a flat above another dwellinghouse, the licence holder must:
 Fit and maintain carpets (with appropriate underlay) to the floors of bedrooms,
living room and any hallway.
 Take reasonable steps to ensure that guests do not first arrive or finally depart from
the property between the hours of 2300 and 0700. The licence holder must advise
guests of this condition as part of their booking terms and conditions.
2. Note that “reasonable steps” allows for unavoidable circumstances, such as significantly-
delayed transport.
3. The licence holder must take reasonable step to ensure that guests do not play amplified
music within the garden or external areas after [23:00 hours] where it would impact
neighbouring residents.
Page 169

Page 170

Page 26 of 29 
Littering and waste disposal
1. The licence holder must provide adequate information on, and the facilities for, the storage,
recycling and disposal of waste.
2. The licence holder shall be responsible for advising residents of the refuse collection day and
for making arrangements for the presentation of bins for collection at the appropriate time
and day.
3 The licence holder must advice guests of:
 Their responsibilities;
 The use of the bins etc. provided for the premises; and
 The location of the nearest recycling area or recycling point.
4. The licence holder must:
 Clearly label bins as belonging to the premises;
 Ensure that guests manage their waste in compliance with (2), including when they
depart; and
 Maintain the bins storage area and the exterior of the premises in a clean and tidy
condition.
Damage to property
The licence holder shall not affix a key box, or any other device to facilitate guest entry to the
premises, to any public or jointly-owned private structure or infrastructure without the prior written
permission of the relevant authority or owner(s). The licence holder must be able to produce the
written permission to the licensing authority on demand.
Additional Conditions for Guest Safety
Legionella risk assessment – spa pools/hot tubs
1. Where a spa pool, including any electric hot tub or wood-fired hot tub, is provided for the
use of guests, the licence holder must install, maintain and operate it so it can be safely
operated and used by guests.
2. The licence holder shall ensure:
 That any such spa pool is installed and maintained in accordance with the guidance
in HSE publication HSG282 Control of legionella and other infectious agents in spa-
pool systems.
 That there is a risk assessment and written scheme of control for Legionella in
respect of any such spa pool.
 That the risk assessment and written scheme of control are lodged with any
application for a licence and are to the satisfaction of the licensing authority.
 That, prior to any spa pool being brought into use for the first time during the period
of the licence, at least 28 days’ notice shall be given to the licensing authority and
Page 170

Page 171

Page 27 of 29 
the risk assessment and written scheme of control shall be submitted at the time of
such notice.
3. The licence holder shall provide guests with information on the safe use of the spa pool in
accordance with the written scheme of control.
4. The licence holder shall not provide or install any inflatable hot tub for the use of guests
without the prior written approval of the licensing authority. Note that the licensing
authority will not give approval in respect of inflatable hot tubs not intended for commercial
use and which cannot conform to the requirements of HSG282.
Guest safety – swimming pools and ponds
1. Where a swimming pool or swimming pond is installed and provided for the use of guests,
the licence holder must take reasonable measures to ensure water quality and bather
safety.
2. The licence holder shall ensure:
 In the case of swimming pools, that a pool safety operating plan is prepared and
lodged with any application for a licence and is to the satisfaction of the licensing
authority. The licence holder shall have regard to the guidance in HSE publication
HSG179 Health and safety in swimming pools.
 In the case of swimming pools and swimming ponds, that a bather safety plan is
prepared and lodged with any application for a licence and is to the satisfaction of
the licensing authority. The bather safety plan shall include measures to minimise
the risk of bathers getting into difficulty, to facilitate the rescue of bathers in
difficulty and to call for the assistance of emergency services where necessary.
 That, prior to any swimming pool or pond being brought into use for the first time
during the period of the licence, at least 28 days’ notice shall be given to the
licensing authority and the pool safety operating plan and bather safety plan shall be
submitted at the time of such notice.
3. In this condition, “swimming pond” means an outdoor body of untreated water in natural
ground which has been excavated or modified to provide a facility for swimming. It does not
include natural watercourses, fresh-water lochs or coastal waters.
4. This condition does not apply to swimming pools which are staffed and operated with
continuous poolside supervision by trained lifeguards.
Risk of Carbon monoxide – barbecue huts
1. Where a barbecue hut is installed and provided for the use of guests, the licence holder
must take reasonable steps to ensure that the risk from Carbon monoxide is minimised.
2. The licence holder shall:
 Install, maintain and operate the barbecue hut only in accordance with the
manufacturer’s instructions.
 Install and maintain in proper working condition a Carbon monoxide monitor and
alarm within the barbecue hut.
Page 171

Page 172

Page 28 of 29 
 Provide guests with instructions on the safe use of the barbecue hut, the symptoms
of Carbon monoxide poisoning and the actions to be taken in an emergency.
 Not permit the use of the barbecue hut by persons under the age of 18 except in the
presence of a person over the age of 18.
 Not permit the use of a barbecue hut as sleeping accommodation.
Guest safety – provision and use of watercraft
1. Where any watercraft are provided for the use of guests, the licence holder must take
reasonable measures to ensure the suitability and safety of the watercraft and the safety of
persons using them.
2. The licence holder shall ensure:
 That any watercraft provided are suitable for the waters upon which they are
intended to be used.
 That any watercraft are operated and maintained in accordance with the
manufacturer’s instructions.
 That personal flotation devices are provided which are suitable for the use intended
and the user, and have regard to the categorisation of any inland waters or
standards issued by the Maritime and Coastguard Agency.
 That personal flotation devices are inspected and maintained in accordance with the
manufacturer’s instructions.
 That guests are provided with proportionate safety information about the use of
watercraft, including the intended areas of use, local hazards, adverse weather
conditions, actions to take in an emergency, and the means of contacting the
emergency services.
3. In this condition, “watercraft” means any boat, canoe, kayak, stand-up paddleboard, raft, or
similar vessel capable of carrying passengers or being ridden upon, and equipped with sails,
or an engine, or capable of being directed or steered using oars or paddles.
4. In complying with this condition, the licence holder shall have regard to advice and guidance
issued by authoritative bodies including, where appropriate, MCA, RoSPA and the Scottish
Canoe Association.
5. In the area of the Loch Lomond and The Trossachs National Park, the licence holder shall
comply with any relevant byelaws issued by the National Park Authority.
6. This condition does not apply to premises where the vessels provided are done so under the
terms of a current boat hire licence issued by the licensing authority and operated in
compliance with the conditions of such a licence.
Guest safety – provision of bicycles
1. Where bicycles are provided for the use of guests, the licence holder must take all
reasonable steps to ensure the safety of persons using them.
2. The licence holder shall ensure:
Page 172

Page 173

Page 29 of 29 
 That any bicycles provided are suitable for the use intended and for the user.
 That, where cycle helmets are provided, they are suitable for the use intended and
the user.
 That there is a programme of inspection and maintenance in place to ensure that
bicycles and cycle helmets are only made available to guests when they are in a safe
condition.
3. In complying with this condition, the licence holder shall have regard to the Cycle Hire
Guidelines of the Association of Cycle Traders.
Guest safety – outdoor play equipment
1. Where any outdoor play equipment is provided for the use of guests, the licence holder
must take all reasonable steps to ensure the safety of persons using the play equipment.
2. The licence holder shall ensure:
 That only equipment which is suitable for the use intended shall be installed and
provided for the use of guests.
 That play equipment is installed and maintained in accordance with the
manufacturer’s instructions.
 That play equipment is subject to an inspection and checking regime in accordance
with the manufacturer’s instructions.
 That rules are in place and communicated to guests to ensure the safe use of play
equipment and to prevent its abuse.
3. In complying with this condition, the licence holder shall have regard to the RoSPA Code of
good practice for play areas and the RoSPA guidance on the safe use of garden trampolines.
4. The provision for the use of guests of inflatable play equipment which is intended for
bouncing or climbing on is prohibited. This prohibition does not apply to inflatable play
equipment which, at all times when it is use, is directly supervised by the licence-holder or
their agent, or an employee of the licence-holder or their agent.
Page 173

Page 174

This page is intentionally left blank

Page 175

Short-term Lets Licensing
Final Draft - Policy Statement 
Page 175

Page 176

2 
Contents 
Foreword
1. Background
2. Timescales for applying
3. Definitions
4. Application and notification
5. Objections and representations
6. Determination of application
7. Right of appeal
8. Licence duration and renewal
9. Licence conditions
10. Temporary exemptions
11. Temporary licences
12. Compliance and enforcement
13. Variation of a licence
14. Suspension and revocation of a licence
15. Planning permission
16. Equality
17. Fees 
Appendix 1 – Contact details
Appendix 2 – Hearing procedure
Appendix 3 – Mandatory conditions
Appendix 4 – Additional conditions
Page 176

Page 177

3 
Foreword 
This policy statement is the first one published by the Argyll and Bute Council.
The purpose of the policy is to provide guidance for applicants, licence holders and
members of the public on the licensing system for short-term lets.
Consultation on the draft policy statement took place during the period from 18th July
2022 to 5th August 2022.
A report providing details of the comments received from consultees was considered
at the meeting of the Planning, Protective Services and Licensing Committee on 28
September 2022 and Council on the 29 September. A copy of the report is available
online at Meetings, agendas, and minutes - Argyll and Bute Council (argyll-bute.gov.uk)
This policy statement will be reviewed and revised when necessary.
Page 177

Page 178

4 
1. Background 
1.1. On 19th January 2022, The Civic Government (Scotland) Act 1982 (Licensing
of Short-term Lets) Order 2022 (“the Order”) was approved by the Scottish
Parliament. The Order came into force on 1st March 2022 and inserts new
legislative provisions into the Civic Government (Scotland) Act 1982 (“the Act”). 
1.2. The Order introduces a new mandatory licensing system for short-term lets
which local authorities are required to establish by 1st October 2022. 
1.3. Prior to the introduction of the legislation, there was no requirement to licence
short-term lets and, therefore, local authorities did not have the ability to
regulate these types of premises. 
1.4. The licensing scheme was brought in by the Scottish Government with the aim
to ensure short-term lets are safe, address issues faced by neighbours, to
facilitate local authorities in knowing and understanding what is happening in
their area, and handling complaints effectively. It also enables local authorities
to ensure the people providing short-term lets are suitable. The legislation aims
to make sure that the economic and tourism benefits from short-term lets are
balanced with the needs and concerns of local communities. 
2. Timescales for applying 
2.1. After 1st October 2022, new hosts and operators will need to have a licence.
This means that, if you were not using your premises to provide short-term lets
before 1st October 2022, you can advertise but not take bookings or receive
guests until you have obtained a licence. 
2.2. Existing hosts or operators (those using accommodation to provide short-term
lets before 1st October 2022) have until 1st April 2023 to apply for a licence.
During this period you can operate without a licence (by continuing to take
bookings and receive guests) unless your licence application has been
determined and refused. 
2.3. After 1st April 2023, existing hosts can only continue to operate if they have
submitted an application for a licence on or before 1st April 2023 that has not
yet been determined or been granted a short-term let licence.
Page 178

Page 179

5 
3. Definitions 
3.1. A short-term let is defined in the 2022 Order as the use of residential
accommodation provided by a host in the course of business to a guest, where
all the following criteria are met- 
(a) the guest does not use the accommodation as their only or principal
home,
(b) the short-term let is entered into for commercial consideration,
(c) the guest is not-
(i) an immediate family member of the host,
(ii) sharing the accommodation with the host for the principal purpose of
advancing the guest’s education as part of an arrangement made or
approved by a school, college, or further or higher educational
institution, or
(iii) an owner or part owner of the accommodation,
(d) the accommodation is not provided for the principal purpose of
facilitating the provision of work or services by the guest to the host or to
another member of the host’s household,
(e) the accommodation is not excluded accommodation,
(f) the short-term let does not constitute an excluded tenancy. 
Commercial consideration - this includes money and a benefit in kind (such as a
provision of a service or reciprocal use of accommodation).
Guest – this means a person who occupies accommodation under a short-term let
Host – this means a person who is the owner, tenant or person otherwise in control
over occupation and use of the accommodation
Immediate family member – a guest is deemed to be an immediate family
member of the host if they are-
(a) your partner (spouse, civil partner or someone you live with as if
you were married to them),
(b) you or your partner’s parent, grandparent, child, grandchild or
sibling,
(c) the partner of one of your parents, grandparents, children,
grandchildren or sibling.
Page 179

Page 180

6 
Excluded accommodation – this means accommodation which is, or is part of-
(a) an aparthotel,
(b) premises in respect of which a premises licence within the meaning of
section 17 of the Licensing (Scotland) Act 2005 has effect and where the
provision of accommodation is an activity listed in the operating plan as
defined in section 20(4) of the 2005 Act,
(c) a hotel which has planning permission granted for use as a hotel,
(d) a hostel,
(e) residential accommodation where personal care is provided to residents,
(f) a hospital or nursing home,
(g) a residential school, college or training centre,
(h) secure residential accommodation (including a prison, young offenders
institution, detention centre, secure training centre, custody centre, short-
term holding centre, secure hospital, secure local authority
accommodation, or accommodation used as military barracks),
(i) a refuge,
(j) student accommodation,
(k) accommodation which otherwise requires a licence for use for hire for
overnight stays,
(l) accommodation which is provided by the guest,
(m) accommodation which is capable, without modification, of transporting
guests to another location,
(n) a bothy, or
(o) accommodation owned by an employer and provided to an employee in
terms of a contract of employment or for the better performance of the
employee’s duties. 
3.2. Please note that if you have an HMO licence for your property, you would still
need a short-term let licence if it is also to be used for short-term lets. This is
the case whether or not you live at the premises covered by your HMO licence. 
3.3. Self-catering property in the grounds of a licensed hotel would be excluded. 
It is recommended that short-term let hosts  take their own independent legal
advice on whether or not their accommodation would require a short-term let
licence.  The Licensing Authority cannot provide legal advice on whether or not a
premises is excluded from requiring a short-term let licence.
Page 180

Page 181

7 
Excluded tenancy – an excluded tenancy means a tenancy which falls within any of
the following definitions:
(a) protected tenancy (within the meaning of section 1 of the Rent (Scotland)
Act 1984,
(b) an assured tenancy (within the meaning of section 12 of the Housing
(Scotland) 1988 Act),
(c) a short assured tenancy (within the meaning of section 32 of the Housing
(Scotland) Act 1988),
(d) a tenancy of a croft (within the meaning of section 3 the Crofters
(Scotland Act 1993),
(e) a tenancy of a holding situated outwith the crofting counties (within the
meaning of section 61 of the Crofters (Scotland Act 1993) to which any
provisions of the Small Landholders (Scotland) Acts 1886 to 1931(8))
applies,
(f) a Scottish secure tenancy (within the meaning of section 11 of the
Housing (Scotland) Act 2001),
(g) a short Scottish secure tenancy (within the meaning of section 34 of the
Housing (Scotland) Act 2001),
(h) a 1991 Act tenancy (within the meaning of section 1(4) of the Agricultural
Holdings (Scotland) Act 2003),
(i) a limited duration tenancy (within the meaning of section 93 of the
Agricultural Holdings (Scotland) Act 2003),
(j) a modern limited duration tenancy (within the meaning of section 5A of
Agricultural Holdings (Scotland) Act 2003),
(k) a short limited duration tenancy (within the meaning of section 4 of the
Agricultural Holdings (Scotland) Act 2003),
(l) a tenancy under a lease under which agricultural land is let for the
purpose of its being used only for grazing or mowing during some
specified period of the year (as described in section 3 of the Agricultural
Holdings (Scotland) Act 2003),
(m) a private residential tenancy (within the meaning of section 1 of the
Private Housing (Tenancies) (Scotland) Act 2016),
(n) a student residential tenancy. 
3.4. There are four types of licences for short-term let accommodation. Any licence
granted must be for either- 
(a) Secondary letting, 
(b) Home letting, 
Page 181

Page 182

8 
(c) Home sharing, or 
(d) Home letting and home sharing. 
3.5. The different types of licences are defined as follows- 
(a) Secondary letting – this means a short-term let involving the letting of property
where you do not normally live, 
(b) Home letting - this means using all or part of your home for short-term lets whilst
you are absent, 
(c) Home sharing – this means using all or part of your own home for short-term lets
whilst you are there. This includes guest houses or bed-and-breakfast
accommodation within the host’s principal residence. 
Page 182

Page 183

9 
3.6. A separate licence is required for each of your premises. However, a single
licence may be issued in respect of unconventional accommodation where
there is more than one separately bookable property on the site. 
3.7. Dwellinghouse means for these purposes, an independent dwelling (with its
own front door, kitchen and bathroom) such as a house, flat, cottage etc. 
3.8. You do not need a separate licence for short-term lets within the same
dwellinghouse. For example, if you are letting out two rooms in your home,
that would be covered by one licence. 
3.9. Unconventional accommodation – this means residential accommodation
that is not defined as a dwelling house and would include residential
accommodation such as glamping pods and yurts.
Page 183

Page 184

10 
4. Application and notification 
4.1. All applicants must complete an online short-term let licence application form.
The application should be submitted online and emailed to shorttermlets@argyll-
bute.gov.uk or, alternatively, posted to, Short-Term Lets Licensing, Regulatory
Services, Argyll and Bute Council, Kilmory, Lochgilphead, Argyll, PA31 8RT
details of which are available at Appendix 1. 
4.2. Applicants will require to  pay the application fee as part of the online application
process or if submitting a paper application form by making a payment to Argyll
and Bute Council by contacting Short-Term Lets on 01546 605519. 
4.3. Under the terms of the Act, all applicants who apply for a short-term let licence
must display a notice for a period of 21 days beginning with the date on which
the application was submitted to the licensing authority, at or near the property to
which the application relates, so that it can be conveniently read by the public. 
4.4. The notice shall state that an application has been made for a licence, the main
facts of the application, that objections and representations in relation to the
application may be made to the licensing authority and how to make objections
or representations. A template will be provided to the applicant once an
application is submitted. 
4.5. Applicants are required to certify compliance that they have displayed the site
notice as soon as possible after the 21 days has expired. A template will be
provided to the applicant once an application is submitted. 
4.6. A copy of the application shall be sent to Police Scotland and the Scottish Fire
and Rescue Service by the local authority. A copy will also be made available
to: 
 Argyll and Bute Council’s Planning Department
 Argyll and Bute Council’s Building Standards service
 Argyll and Bute Council’s Environmental Health service
 Loch Lomond and the Trossachs Parks Authority (where the property is within
the National Park) 
4.7. All personal data will be processed in line with the following privacy notices: 
https://www.argyll-bute.gov.uk/privacy/civic-government-licensing 
Page 184

Page 185

11 
5. Objections and representations 
5.1. The 1982 Act permits any member of the public to submit an objection or
representation in relation to an application for a short-term let licence. 
5.2. To enable Argyll and Bute Council, as licensing authority (“the Council”)
to entertain an objection or representation, it must be: 
(a) in writing (email is sufficient),
(b) specify the grounds of the objection or the nature of the
representation,
(c) specify the name and address of the person making it,
(d) be signed off by them or on their behalf,
(e) be received by the Council within 28 days from when the notice
of application is displayed. 
5.3. Anonymous objections or representations will not be considered. “Anonymous”
includes objections or representations where the person making the objection or
representation cannot be contacted using the contact information provided. 
5.4. Late objections or representations may be considered, entirely at the Council’s
discretion, if the Council is satisfied that there is sufficient reason as to why it
was not made in the time required. 
5.5. The objection should be relevant to the statutory grounds that can be taken
into consideration when refusing an application. These are set out in the 1982
Act- 
(a) the applicant or anyone else detailed in the application form is not a fit
and proper person to be the holder of a licence,
(b) the activity would be carried out by a person other than the applicant
who, if he had made the application himself, would have been refused,
(c) the premises is not suitable for the conduct of the activity, having regard
to-
(i) the location, character or condition of the premises,
(ii) the nature and extent of the proposed activity,
(iii) the kind of persons likely to be in the premises,
(iv) the possibility of undue public nuisance, public order;
or public safety,
(v) where there is other good reason 
5.6. It should detail clearly the reasons for the objection/representation and why the
applicant and/or the premises are not suitable. 
5.7. A copy of the objection or representation will be provided to the applicant and
will include your name and address. All personal data will be processed in line
with the following privacy notice: 
https://www.argyll-bute.gov.uk/privacy/civic-government-licensing
Page 185

Page 186

12 
6. Determination of application 
6.1. Everybody named on the application form will be subject to the fit and proper
test. Every application form will require consultation with Police Scotland who
will carry out background checks. 
6.2. Licensing authorities are responsible for determining whether you are a fit and
proper person to be the holder of a licence for short-term lets. Consideration
will be given to a wide range of information including relevant criminal
convictions, other relevant information provided by Police Scotland, any
previous disqualifications from being a private landlord, previous revocations
of a HMO licence and providing false or misleading information in your
application form. 
6.3. If there are no objections or adverse representations to a short-term let licence
application, the application will be determined under delegated powers by the
Executive Director with responsibility for Regulatory Services. 
6.4. If an objection or adverse representation is submitted in relation to the short-
term let licence application and, this cannot otherwise be resolved, the
application will be subject to a hearing at a meeting of the Council’s Planning,
Protective Services and Licensing Committee. 
6.5. The person submitting the objection or representation will be invited to attend
the meeting of the Planning, Protective Services and Licensing Committee and
speak to their objection/representation. You will be given at least 14 days’
notice of the hearing date. 
6.6. The applicant or their representative will also be invited to attend the meeting
and given the opportunity to state why the application should be granted. 
6.7. The Committee will be able to ask questions of both parties and, thereafter,
decide whether to grant or refuse the application. The grounds for refusing an
application are set out at paragraph 5.5. 
6.8. Applications will be heard in public unless required to be taken privately on the
grounds of disclosure of exempt information as defined in Paragraph 3 of Part
1 of Schedule 7A of the Local Government (Scotland) Act 1973 
6.9. A copy of the Council’s hearing procedure can be found at Appendix 2. 
6.10. Both the applicant and the person(s) making an objection/representation
can request a statement of reasons for the decision within 21 days of the date
of the decision. The statement of reasons will be provided within 10 days of
that request.
Page 186

Page 187

13 
6.11. If your application for a licence is refused, you cannot reapply for a
licence within 1 year of that decision, unless there has been a material change
in your circumstances since then. 
7. Right of appeal 
7.1. The applicant and the person(s) making an objection/representation have a
right of appeal to the Sheriff Court. 
7.2. However, they only have this right if they have taken every opportunity to state
their case to the Committee as has been made available. 
7.3. The Sheriff can uphold an appeal only if the sheriff considers that the licensing
authority erred in law, based their determination on any incorrect material fact,
acted contrary to natural justice or exercised their discretion in an
unreasonable manner. 
7.4. Any appeal must be lodged by way of a summary application with the relevant
Sheriff Clerk’s office within 28 days of the date of the decision appealed
against. 
7.5. Parties should seek their own independent legal advice in relation to an appeal. 
8. Licence duration and renewal 
8.1. The duration of the licence applies from the date on which the licence comes
into force. This will be specified on the licence together with the expiry date of
the licence. 
8.2. When an application is made to renew a licence timeously, the existing licence
will continue in effect until such time as a decision is made on the renewal
application. 
8.3. A licence shall have effect- 
 for a period of 3 years from the date when it comes into force; or
 for such shorter period as the licensing authority may decide at that time when
they grant; or
 for such longer period as the licensing authority may decide at the time when
they renew a short-term let licence
Page 187

Page 188

14 
8.4. The Scottish Government’s guidance for licensing authorities on short-term lets
has made it clear that licensing authorities are encouraged to renew licences
for a period of 3 years, unless they have good reasons to do otherwise. 
8.5. Whilst each application will be decided on its own merits, it is not anticipated
that licences will be renewed for a period of longer than 3 years. 
9. Licence conditions 
9.1. The Act sets out a number of mandatory licence conditions which apply to all
short-term let across Scotland. A list of these conditions can be found at
Appendix 3. 
9.2. In addition to the mandatory licence conditions which apply to all short-term
lets, licensing authorities may impose additional conditions. These enable the
licensing authority to respond to local challenges and concerns relative to
specific types of short-term letting. 
9.3. There are a number of additional conditions which will apply to all short-term
let properties. There also some specific additional conditions which may only
apply to certain types of short-term let properties or to properties following
investigation of concerns. A list of the additional licence conditions which may
apply to your short-term let licence can be found at Appendix 4. 
10. Temporary exemptions 
10.1 The Council may, on application made to it, grant temporary exemptions from
the requirement to hold a short-term let licence in relation to a specified
property or properties and during a specified period, which must not exceed 6
weeks in any 12 month period. 
10.2 Temporary exemption applications from the requirement to hold a short-term let
licence which, if granted would destabilise the security of tenure of private
tenants, resulting in eviction, will not be considered by the Council. 
10.3 The Council will aim to determine temporary exemption applications from the     
requirement to hold a short-term let licence within a two month period or less. 
10.4 The Council will only consider granting a temporary exemption from the   
requirement to hold a short-term let licence in specific circumstances due to
short-term let safety requirements and to minimise the impact on communities
and neighbours. For example:- 
 to accommodate a large influx of visitors over a short period to support
sports championship competitions and arts festivals, for example, the Mull
Rally or Tiree Music Festival. 
Page 188

Page 189

15 
10.5  A temporary exemption from the requirement to hold a short-term let licence   
does not affect the way planning rules apply. If any temporary changes to
planning rules have been made (for example to handle a major international
event), the Council will publicise these. 
10.6  The Council will also attach conditions to a temporary exemption from the
requirement to hold a short-term let licence. Conditions attached to a
temporary exemption will include all Mandatory Conditions and if deemed high
risk or deemed necessary, further additional conditions may be added. 
10.7   The Chief Constable and the Scottish Fire and Rescue Service will be
consulted in respect of applications for temporary exemptions from the
requirement to hold a short-term let licence. 
11. Temporary licences 
11.1 The Council may consider granting temporary licences in limited
circumstances.  For example:- 
 to ensure that short-term lets can continue as going concerns when being
sold from one operator to another. 
11.2 A temporary licence should be made online or where agreed, by way of paper
application.  Details for the application process are set out in Section 3. 
11.3  Temporary licences may be granted for a duration of up to 6 weeks. A
temporary licence cannot be renewed. However, if a host or operator applies for
a full licence during the period of a temporary licence, the temporary licence
duration will extend until their full licence application has been determined. 
11.4 A temporary licence number will be given, and conditions attached to the  
licence must be complied with. 
11.5 The Council must consult the Chief Constable and Scottish Fire and Rescue in
respect of an application for a temporary licence. 
12. Compliance and enforcement 
12.1. Unlicensed short-term lets 
12.1.1. It is a criminal offence to carry on an activity for which a licence is
required without having a licence and without reasonable excuse. 
12.1.2. The Scottish Government has set out the following timescales for
hosts and operators. Please note the rules are different depending on
whether you are a new host/operator or an existing host/operator- 
New hosts/operators
Page 189

Page 190

16 
 From 1st October 2022 you cannot accept bookings until you have
obtained a short-term let licence. 
 From 1st October 2022, you cannot operate while your short-term
let application is being determined. 
Existing hosts/operators
 Existing hosts/operators must apply for a short-term let licence by 1st
April 2023, at the latest. 
 If you have been trading on or before 30th September 2022, you may
continue to accept bookings after 1st October 2022 but only if you have
made a licence application by 1st April 2023. 
 You can continue to operate for the time it takes for your licence
application to be finally determined. 
 A provisional licence number will be provided once the application is
duly-made. 
 It will be an offence to offer short-term let accommodation after 1st
July 2024 unless you hold a licence.
Page 190

Page 191

17 
12.1.3. The Council will maintain a public register of short-term let licence
applications and licences granted. This will allow members of the public to
check the licensing status of a premises being used as a short-term let. 
12.1.4. Complaints about suspected unlicensed hosts/operators should
be directed to shorttermlets@argyll-bute.gov.uk 
12.2. Licensed short-term lets 
12.2.1. Hosts and operators must ensure that any advert or listing placed
on or after they are granted a licence, or a provisional licence number,
includes their licence number. 
12.2.2. Hosts and operators must ensure that they comply with all the
mandatory and any additional conditions on their licence. It is a criminal
offence to fail to comply with a licence condition if a licence holder has not
used all due diligence to prevent the offence. 
12.2.3. It is also a criminal offence for a licence holder, without
reasonable cause, to fail to notify the licensing authority of a material
change of circumstances. 
12.2.4. The Council may undertake premises site visits as part of the
application process and throughout the duration of the licence to ensure
compliance with licence conditions. 
12.3. Complaints about licensed short-term lets 
12.3.1. In the first instance, guests should raise any concerns about their
short-term let with their host/operator or letting agent/platform. If the issue
is sufficiently severe, then the Council may become involved. 
12.3.2. A complaint must be relevant to the matters that the Council can
take into consideration. Frivolous or vexatious complaints will not be
considered. 
12.3.3. The Council can consider matters relating to the suitability of the
licence holder, threats to public safety or public order or whether a
condition of the licence has been contravened. 
12.3.4. These issues would include a host/operator exceeding the
number of people staying at the premises, serious disturbance or antisocial
Page 191

Page 192

18 
behaviour or concerns about the maintenance and safety of the premises.
These complaints can be directed to shorttermlets@argyll-bute.gov.uk 
12.3.5. Please note that the Council cannot consider complaints in
relation to the quality of a guest’s stay or specific contractual matters
between the guest and the host/operator as this is outside the scope of the
licensing scheme. 
12.3.6. Complaints will aim to be acknowledged within 5 working days. A
full response advising you of the outcome may take some time if the
complaint requires further investigation. The complaint may also need to
be directed to other departments within the Council other services such as
Police Scotland or Scottish Fire and Rescue Service for input.
Complainants will be kept up to date with progress if there is a delay in a
full response being provided. 
12.3.7. Premises site visits may be undertaken by the Council as part of
an investigation into a complaint. 
12.4. Enforcement 
12.4.1. It is possible that some complaints may require enforcement
action from the Council. 
12.4.2. The Act provides for several options for enforcement action if
justified. This includes additional licence conditions being attached,
enforcement notices or variation, suspension or revocation of the licence
or in more serious circumstance pursuing a prosecution. 
12.4.3. The Council recognises the importance of having compliance
issues monitored in order to ensure licensed Short-term lets are complying
with licence standards and not causing an unnecessary nuisance to the
community, nearby residents or neighbours. As such it will carry out a risk-
based approach to enforcement, using a range of escalating informal
measures, prior to an Enforcement Notice being issued and subsequently
a complaint being made to the Committee in relation to the STL licence. 
12.4.4. An enforcement notice will set out the matters constituting a
breach or likely breach, the action required to rectify or prevent the breach
and the date by which the action must be taken. 
12.4.5. If the matter is not addressed satisfactorily by the licence holder,
the Council may then consider a variation, suspension or revocation of the
licence. 
12.4.6. You will not be charged a fee for a routine visit. However, you will 
be charged if a follow up visit is necessary because you have breached
one of your licence conditions..
Page 192

Page 193

19 
13. Variation of a licence 
13.1. A licensing authority may, at any time, whether or not upon an
application made to them by the holder of the licence, vary the terms on any
grounds they think fit. 
13.2. A variation application cannot, however, be used to substitute a new
holder of the licence for the existing one i.e. effectively to transfer a licence. 
14. Suspension or revocation of a licence 
14.1. A licensing authority may, whether upon a complaint made to them or
not, suspend or revoke a licence. 
14.2. A licensing authority may order the suspension or revocation of a
licence if in their opinion- 
 the holder of the licence is no longer a fit and proper person to hold the
licence
 the licence holder is managing the property on behalf of someone who
would have been refused the grant or renewal of the licence 
 the short-term let is causing or is likely to cause undue public nuisance or
a threat to public order or public safety; or 
 a condition of the licence has been contravened 
14.3. The period of suspension can be the unexpired portion of the duration
of the licence, or such shorter period as the licensing authority may fix. The
effect of the suspension shall be that the licence shall cease to have effect
during the period of suspension. 
Page 193

Page 194

20 
15. Planning permission 
15.1. The requirement for planning permission is a separate matter from
licencing of short-term lets.  Whether or not planning permission is required for
the use of a dwelling for short- term let purposes will firstly depend on whether
it is located within a Short-Term Letting Control Area. Outwith control areas,
the requirement for planning permission would be a matter for the planning
authority to determine on a case by case basis, depending on the nature and
circumstances of the property and the manner in which it is operated.  Hosts
and operators must comply with both planning and licensing law. 
15.2. The Council is the relevant planning authority for the Argyll and Bute
area located outwith the Loch Lomond and the Trossachs National Park. The
National Park Authority is the planning authority for the full extent of the the
Loch Lomond and the Trossachs National Park designation. 
Short-Term Letting Control Areas: 
15.3 There is a separate legislative process from licensing which allows the  
Council and the National Park Authorities, as planning authorities, to
establish short-term let control areas.  The purpose of control areas is to
help planning authorities manage high concentrations of secondary letting
(where it affects the availability of residential housing or the character of a
neighbourhood) and to restrict or prevent short-term lets in places or types of
buildings where it is not appropriate. 
15.4  Within a control area designated by a planning authority, use of a
property for short-term letting will always require express planning permission.
The host or operator must make an application for planning permission or
already have planning permission before they apply for a licence. 
15.5 There are currently no Control Areas within Argyll and Bute and the
Council and Loch Lomond and the Trossachs National Park does not
propose to designate any Short-Term Letting Control Areas at this time,
but will review this position in the course of 2023/24. 
15.6        Please note that planning authorities could designate control areas after a     
premises has already obtained a short-term let licence. Licence holders would  
be given a reasonable opportunity to comply with the mandatory condition by
submitting a planning application or application for a Certificate of Lawful Use or
Development (CLUD) as soon as possible after the control area is
designated. If a CLUD or planning permission is refused, this may result in the
licence being refused, varied or revoked as appropriate. 
Page 194

Page 195

21 
Outwith Control Areas: 
15.7 Outside of a control area, it is for the planning authority to consider
whether any change of use of a dwelling house is material and, therefore,
requires planning permission, although you may also require permission
where a premises has resulted in the subdivision of a residential plot where
it is an annex or garage that has been converted. This is determined on a
case by case basis and will depend very much on the nature of the dwelling
to be let, its relationship to neighbouring land uses, its servicing
arrangements, and the manner in which the property will be operated. 
15.8 Hosts and operators are, therefore, encouraged to engage with the
relevant planning authority prior to submitting a licence application to
confirm whether they require planning permission or a certificate of lawful
use of development. 
Detailed enquiries can be submitted for review and assessment through the
Council’s chargeable pre-application advice service: Pre-Application Guidance
(argyll-bute.gov.uk) 
Contact details for Loch Lomond and the Trossachs National Park planning
service:
Planning - #LetsDoNetZero -Loch Lomond & The Trossachs National Park
(lochlomond-trossachs.org) 
Page 195

Page 196

22 
16 Equality 
16.4 The Equality Act 2010 Act introduced a new public sector equality duty
which requires public authorities, including the Committee, to try and eliminate
discrimination, promote equality and good relations across a range of protected
characteristics. 
16.5 Prior to the Committee implementing this policy an equality impact
assessment was undertaken. This can be viewed using the following link [
Equality and Socio-Economic Impact Assessments (argyll-bute.gov.uk)
Page 196

Page 197

23 
17 Fees 
17.4 Licensing authorities are required to charge fees in respect of processing
and determining, the consideration of applications, the issue of duplicate
licences and other matters. They must ensure that the fees are sufficient to
cover their administrative expenses and are reviewed periodically. 
17.5 Licensing fees are non-refundable. Whether or not a licensing
application is granted, the Council incurs significant costs in processing the
application. 
17.6 The Council has considered the following criteria in the process of
determining the fees: 
 The size of the premises
 The number of rooms at the premises
 The number of guests who can reside at the premises
 The type of short-term let 
Application and renewal – full licence 
Guest capacity applied for
(including children under the age
of 10)
Home sharing or
home letting
licence
Secondary letting
licence
Up to 4 £226 £316
5 to 8 £316 £452
9 to 12 £497 £678
13 to 20 £633 £904
21 and over £814 £1130 
Other types of application Fee
Temporary licence application 50% of fee
Temporary exemption application] 50% of fee
Variation of licence / change in circumstances £77
Duplicate licence £41 
Enforcement costs Fee
Officer hourly cost in 15 minute intervals (Inspection of a premises
where concern is flagged at the application process by a consultee
£94.30/hour
**Where a fee is charged for such a visit, a report must be
provided to the host or operator within 28 days of the inspection,
unless otherwise agreed. Otherwise, the fee must be refunded to
the licence holder*** 
Page 197

Page 198

24 
18.4  The fee charged will weighted according to the following factors, where the unit
fee is the cost of dealing with a non-controversial application for a 4-person
secondary let licence. Applications for premises with larger numbers of guests are
likely to require more enquiries, or attract more representations, or objections,
which require to be dealt with as part of the application.
Guest capacity
(People)
Home sharing and
home letting licence
Secondary let
licence
Up to 4 0.5 0.7
5 to 8 0.7 1.0
9 to 12 1.1 1.5
13 to 20 1.4 2.0
21 and over  1.8 2.5
Page 198

Page 199

25 
Appendix 1 – Contact details 
Telephone – 01546 6605519  
Email – shorttermlets@argyll-bute.gov.uk
Postal Address – Short-Term Lets Licensing, Argyll and Bute Council, Kilmory,
Lochgilphead, Argyll, PA31 8RT 
Page 199

Page 200

26 
Appendix 2 – Hearing procedure 
DURING THE HEARING 
1. The Chair will introduce the Members and Officials present. If the
representations/objection(s) were submitted timeously and there are no spent
convictions to be considered, then proceed directly to number 4. 
2. If the representation/objection (from the Police or any other party) has been
received late the Committee must hear details as to why the
representation/objection was late and be satisfied that there is sufficient reason
why it was not made in the time required. If they agree that then the
representation/objection can be heard otherwise it should be disregarded. The
process to be followed should be that the objector is invited to provide reasons
as to why the submission was late. Members may ask any follow up questions
of the objector. The applicant must then be asked if they have any objections
to the late submission being accepted. The Committee must take all comments
into account when deciding whether to accept the late submission. 
3. If spent convictions are to be referred to then the guidance notes for spent
convictions should be followed for each conviction. The Committee should
resolve to go into private whilst considering spent convictions. 
4. The hearing procedure below should now be followed: 
a The Licensing Officer will present the report to the Committee
b The applicant or the party who has initiated the hearing will present their case
first
c The presenting party shall be entitled to provide information in support of their
application, representation or objection (as applicable).
d Any other interested party will have the opportunity to ask the presenting party
relevant questions.
e The Committee Members will have the opportunity to ask the presenting party
relevant questions.
f Any other interested parties will then present their case in turn and be entitled
to provide information in support of their application, representation or
objection (as applicable)
g Any other interested party will have the opportunity to ask the presenting party
relevant questions.
h The Committee Members will have the opportunity to ask the presenting party
relevant questions
Page 200

Page 201

27 
i The Chair will invite the applicant, or the party who has initiated the hearing,
to briefly summarise their points if they wish.
j The Chair will invite the other interested parties to briefly summarise their
points if they wish.
k The Chair will ask the applicant, or the party who has initiated the hearing,
and all parties making representations, that they are satisfied that they have
said all they wish to.
l At the sole discretion of the Members, the Committee may decide to retire to
consider the representations/objections in private.
m The Committee will invite the parties to return to the meeting and the Chair
will invite Members to take a decision. 
NOTE: If during private deliberations, the Committee receive advice on a legal
submission from the Clerk which is contrary to the view of the party making
the submission or the Committee believe additional information would be
relevant, then these points should be raised with the parties, in public, prior to
any decision being made. 
DECISION 
A determination of the case will be made at the conclusion of the hearing and all
parties will be notified of the decision in writing within 7 days of the hearing and
shall be advised of his/her right to seek written reasons and appeal to the Sheriff
Court. 
If the decision of the Committee is to suspend, refuse or refuse to suspend a
licence, a relevant person has a right to request within 28 days of the meeting, the
Committee’s reasons for arriving at their decision. Unless the circumstances of the
case justify immediate suspension, the suspension shall not take effect for 28 days
from the date of the decision. 
Appeals against the decision of the Committee must be lodged with the Sheriff
Clerk within 28 days of the date of the decision.
Page 201

Page 202

28 
Appendix 3 – Mandatory licence conditions 
Agents
1. Only those named as a holder of the licence can carry out the day to day
management of the short-term let of the premises.
Type of licence
2. The holder of the licence may only offer the type of short-term let for which the
licence has been granted.
Fire safety
3. The holder of the licence must ensure the premises has satisfactory equipment
installed for detecting, and for giving warning of—
(a) fire or suspected fire, and
(b) the presence of carbon monoxide in a concentration that is hazardous to health.
4. The holder of the licence must keep records showing that all upholstered
furnishings and mattresses within the parts of the premises which are for guest use,
or to which the guests are otherwise permitted to have access, comply with the
Furniture and Furnishings (Fire Safety) Regulations 1988.
Gas safety
5. Where the premises has a gas supply—
(a) the holder of the licence must arrange for an annual gas safety inspection of all
gas pipes, flues and appliances in the premises,
(b) if, after an annual inspection, any appliance does not meet the required safety
standard, the holder of the licence must not allow a short-term let of the premises
until the works necessary to bring the appliance to the required safety standard have
been carried out.
Electrical safety
6. Where there are electrical fittings or items within the parts of the premises which
are for guest use, or to which the guests are permitted to have access, the holder
of the licence must—
(a) ensure that any electrical fittings and items are in—
(i) a reasonable state of repair, and
(ii) proper and safe working order,
(b) arrange for an electrical safety inspection to be carried out by a competent person
at least every five years or more frequently if directed by the competent person,
(c) ensure that, following an electrical safety inspection, the competent person
produces an Electrical Installation Condition Report on any fixed installations,
(d) arrange for a competent person to—
Page 202

Page 203

29 
(i) produce a Portable Appliance Testing Report on moveable appliances to which a
guest has access, and
(ii) date label and sign all moveable appliances which have been inspected.
7. In determining who is competent, the holder of the licence must have regard to
guidance issued by the Scottish Ministers under section 19B(4) of the Housing
(Scotland) Act 2006(2).
Water safety: private water supplies
8. Where the premises are served by a private water supply, the licence holder
must comply with the requirements on the owners of private dwellings set out in the
Water Intended for Human Consumption (Private Supplies) (Scotland) Regulations
2017
Water safety: legionella
9. The holder of the licence must assess the risk from exposure to legionella within
the premises, whether or not the premises are served by a private water supply.
Safety & repair standards
10.(1) The holder of the licence must take all reasonable steps to ensure the
premises are safe for residential use.
(2) Where the premises are subject to the requirements of Chapter 4 of Part 1 of the
Housing (Scotland) Act 2006, the holder of the licence must ensure that the
premises meet the repairing standard.
Maximum Occupancy
11. The licence holder must ensure that the number of guests residing on the
premises does not exceed the number specified in the licence.
Information to be displayed
12. The holder of the licence must make the following information available within
the premises in a place where it is accessible to all guests—
(a) a certified copy of the licence and the licence conditions,
(b)fire, gas and electrical safety information,
(c) details of how to summon the assistance of emergency services,
(d) a copy of the gas safety report,
(e) a copy of the Electrical Installation Condition Report, and
(f) a copy of the Portable Appliance Testing Report.
Planning Permission
13. Where the premises is in a short-term let control area for the purposes of section
26B of the Town and Country Planning (Scotland) Act 1997 (“the 1997 Act”), the
holder of the licence must, where the use of the premises for a short-term let
requires planning permission under the 1997 Act, ensure that either—
(a) an application has been made for planning permission under the 1997 Act and
has not yet been determined, or
(b) planning permission under the 1997 Act is in force.
Page 203

Page 204

30 
Listings
14.(1) The holder of the licence must ensure that any listing or advert (whether
electronic or otherwise) for the short-term let of the premises includes—
(a) the licence number, and
(b) a valid Energy Performance Certificate rating if an Energy Performance
Certificate is required for the premises, in accordance with the Energy Performance
of Buildings (Scotland) Regulations 2008
(2) The holder of the licence must ensure that any listing or advert (whether
electronic or otherwise) for the short-term let of the premises is consistent with the
terms of the short-term let licence.
Insurance
15. The holder of the licence must ensure that there is in place for the premises—
(a) valid buildings insurance for the duration of the licence, and
(b) valid public liability insurance for the duration of each short-term let agreement.
Payment of fees
16. The holder of the licence must pay any fees due to the licensing authority in
respect of the licence on demand.
False or misleading information
17. The holder of the licence must not provide any false or misleading information
to the licensing authority.
Interpretation
18. In this schedule—
“Electrical Installation Condition Report” means a report containing the following
information—
(a) the date on which the inspection was carried out,
(b) the address of the premises inspected,
(c) the name, address and relevant qualifications of the person who carried out the
inspection,
(d) a description, and the location, of each installation, fixture, fitting and appliance
inspected,
(e) any defect identified,
(f) any action taken to remedy a defect,
“Energy Performance Certificate” means a certificate which complies with regulation
6 of the Energy Performance of Buildings (Scotland) Regulations 2008,
“gas safety report” means a report containing the following information—
(a) the date on which the appliance or flue was checked,
(b) the address of the premises at which the appliance or flue is installed,
(c) a description of and the location of each appliance or flue checked,
Page 204

Page 205

31 
(d) any safety defect identified,
(e) any remedial action taken,
(f) confirmation that the check undertaken complies with the requirements of an
examination of—
(i) the effectiveness of any flue,
(ii) the supply of combustion air,
(iii) subject to head (iv), its operating pressure or heat input or, where necessary,
both,
(iv) if it is not reasonably practicable to examine its operating pressure or heat input
(or, where necessary, both), its combustion performance,
(v) its operation so as to ensure its safe functioning,
(g) the name and signature of the individual carrying out the check, and
(h) the registration number with which that individual, or that individual’s employer, is
registered with a body approved by the Health and Safety Executive for the purposes
of regulation 3(3) of the Gas Safety (Installation and Use) Regulations 1998,
Page 205

Page 206

32 
Appendix 4 – Additional licence conditions 
Short-term Lets: Proposed Additional Conditions
Introduction
Argyll and Bute Council consider that additional conditions should be applied to
short-term let licences in its area. These derive from (a) the Part 2 Guidance for
licensing authorities and (b) issues relating to guest safety which the Council has
identified in its area and for which it considers additional licence conditions are
necessary and appropriate.
The “Part 2” additional conditions, are based closely upon the examples provided
by the Scottish Government. These conditions would be generally-applicable to all
licences, although some, for instance those relating to impact noise are not
necessary for detached premises with no party structures.
The guest safety conditions are intended for specific premises where certain
facilities and amenities are provided for the use of guests (this would require a
declaration on the application form). Alternatively, the conditions could be
generally-applied with a conditional clause; the draft guest safety conditions are in
the latter form. 
Additional conditions based on Part 2 Guidance 
Antisocial behaviour
1. The licence holder must take reasonable steps to manage the premises in
such a way as to seek to prevent and deal effectively with any antisocial
behaviour by guests to anyone else in the short-term let and in the locality
of the short-term let.
2. The licence holder must take reasonable steps to:
 Ensure that no disturbance or nuisance arises within or from the
premises, for example by explaining the house rules to the guests;
 Deal effectively with any disturbance or nuisance arising within or from
the premises, as soon as reasonably practicable after the licence holder
is made aware of it; and
 Ensure that any vehicles belonging to guests are parked lawfully, for
example explaining where any designated parking spaces are to be
found and highlighting any local rules.
3. The licence holder must take reasonable step to ensure that guests do not
play amplified music within the garden or external areas where or at times it
would impact neighbouring residents. 
Page 206

Page 207

33 
Privacy and security
1. The licence holder must manage the premises in such a way as to respect
and protect the privacy and security of neighbours.
2. The licence holder must ensure:
 Guests know and understand any particular rules applying to shared
areas and entrances;
 Guests understand that shared doors should be properly and securely
closed after use; and
 The provision of access codes or keys to guests cannot be used by
guests to gain access to shared areas after they have finally departed.
Noise control in flatted premises
1. Where the premises are a flat above another dwellinghouse, the licence
holder must:
 Fit and maintain carpets (with appropriate underlay) to the floors of
bedrooms, living room and any hallway.
 Take reasonable steps to ensure that guests do not first arrive or finally
depart from the property between the hours of 2300 and 0700. The
licence holder must advise guests of this condition as part of their
booking terms and conditions.
2. The licensing authority may, at its own discretion, exempt any flatted
premises from the requirement to carpet floors where the licence holder
can demonstrate that they have been built to or been converted to
Domestic Technical Standard 5.1.
3. Note that “reasonable steps” allows for unavoidable circumstances, such
as significantly-delayed transport.
Littering and waste disposal
1. The licence holder must provide adequate information on, and the facilities
for, the storage, recycling and disposal of waste.
2. The licence holder shall be responsible for advising residents of the refuse
collection day and for making arrangements for the presentation of bins for
collection at the appropriate time and day.
3 The licence holder must advice guests of:
 Their responsibilities;
 The use of the bins etc. provided for the premises; and
 The location of the nearest recycling area or recycling point.
4. The licence holder must:
 Clearly label bins as belonging to the premises;
 Ensure that guests manage their waste in compliance with (2), including
when they depart; and
Page 207

Page 208

34 
 Maintain the bins storage area and the exterior of the premises in a
clean and tidy condition.
Damage to property
The licence holder shall not affix a key box, or any other device to facilitate guest
entry to the premises, to any public or jointly-owned private structure or
infrastructure without the prior written permission of the relevant authority or
owner(s). The licence holder must be able to produce the written permission to the
licensing authority on demand. 
Additional Conditions for Guest Safety 
Legionella risk assessment – spa pools/hot tubs
1. Where a spa pool, including any electric hot tub or wood-fired hot tub, is
provided for the use of guests, the licence holder must install, maintain and
operate it so it can be safely operated and used by guests. 
2. The licence holder shall ensure, so far as is reasonably practicable:
 That any such spa pool is installed and maintained in accordance with
the guidance in HSE publication HSG282 Control of legionella and other
infectious agents in spa-pool systems.
 That there is a risk assessment and written scheme of control for
Legionella in respect of any such spa pool.
 That the risk assessment and written scheme of control are lodged with
any application for a licence and are to the satisfaction of the licensing
authority.
 That, prior to any spa pool being brought into use for the first time
during the period of the licence, at least 28 days’ notice shall be given to
the licensing authority and the risk assessment and written scheme of
control shall be submitted at the time of such notice.
3. The licence holder shall provide guests with information on the safe use of
the spa pool in accordance with the written scheme of control.
4. The licence holder shall not provide or install any inflatable hot tub for the
use of guests without the prior written approval of the licensing authority.
Note that the licensing authority will not give approval in respect of
inflatable hot tubs not intended for commercial use and which cannot
conform to the requirements of HSG282.
Guest safety – swimming pools and ponds
1. Where a swimming pool or swimming pond is installed and provided for the
use of guests, the licence holder must take reasonable measures to ensure
water quality and bather safety.
2. The licence holder shall ensure:
Page 208

Page 209

35 
 In the case of swimming pools, and swimming ponds, that a pool safety
operating plan is prepared and lodged with any application for a licence
and is to the satisfaction of the licensing authority. The licence holder
shall have regard to the guidance in HSE publication HSG179 Health
and safety in swimming pools.
 In the case of swimming pools and swimming ponds, that a bather
safety plan is prepared and lodged with any application for a licence
and is to the satisfaction of the licensing authority. The bather safety
plan shall include measures to minimise the risk of bathers getting into
difficulty, to facilitate the rescue of bathers in difficulty and to call for the
assistance of emergency services where necessary.
 That, prior to any swimming pool or pond being brought into use for the
first time during the period of the licence, at least 28 days’ notice shall
be given to the licensing authority and the pool safety operating plan
and bather safety plan shall be submitted at the time of such notice.
3. In this condition, “swimming pond” means an outdoor body of untreated
water in natural ground which has been excavated or modified to provide a
facility for swimming. It does not include natural watercourses, fresh-water
lochs or coastal waters.
4. This condition does not apply to swimming pools which are staffed and
operated with continuous poolside supervision by trained lifeguards.
Risk of Carbon monoxide – barbecue huts
1. Where a barbecue hut is installed and provided for the use of guests, the
licence holder must take reasonable steps to ensure that the risk from
Carbon monoxide is minimised.
2. The licence holder shall, so far as is reasonably practicable:
 Install, maintain and operate the barbecue hut only in accordance with
the manufacturer’s instructions.
 Install and maintain in proper working condition a Carbon monoxide
monitor and alarm within the barbecue hut.
 Provide guests with instructions on the safe use of the barbecue hut,
the symptoms of Carbon monoxide poisoning and the actions to be
taken in an emergency.
 Not permit the use of the barbecue hut by persons under the age of 18
except in the presence of a person over the age of 18.
 Not permit the use of a barbecue hut as sleeping accommodation.
3. For the purposes of this condition, a barbecue hut is a purpose-built,
structure including a fixed hearth, and fixed ventilation supplying both fresh
air to the hearth and extracting the products of combustion from the occupied
space. 
Page 209

Page 210

36 
Guest safety – provision and use of watercraft
1. Where any watercraft are provided for the use of guests, the licence holder
must take reasonable measures to ensure the suitability and safety of the
watercraft and the safety of persons using them.
2. The licence holder shall ensure:
 That any watercraft provided are suitable for the waters upon which
they are intended to be used.
 That any watercraft are operated and maintained in accordance with the
manufacturer’s instructions.
 That personal flotation devices are provided which are suitable for the
use intended and the user, and have regard to the categorisation of any
inland waters or standards issued by the Maritime and Coastguard
Agency.
 That personal flotation devices are inspected and maintained in
accordance with the manufacturer’s instructions.
 That guests are provided with proportionate safety information about the
use of watercraft, including the intended areas of use, local hazards,
adverse weather conditions, actions to take in an emergency, and the
means of contacting the emergency services.
3. In this condition, “watercraft” means any boat, canoe, kayak, stand-up
paddleboard, raft, or similar vessel capable of carrying passengers or being
ridden upon, and equipped with sails, or an engine, or capable of being
directed or steered using oars or paddles.
4. In complying with this condition, the licence holder shall have regard to
advice and guidance issued by authoritative bodies including, where
appropriate, MCA, RoSPA and the Scottish Canoe Association.
5. In the area of the Loch Lomond and The Trossachs National Park, the
licence holder shall comply with any relevant byelaws issued by the
National Park Authority.
6. This condition does not apply to premises where the vessels provided are
done so under the terms of a current boat hire licence issued by the
licensing authority and operated in compliance with the conditions of such a
licence.
Guest safety – provision of bicycles
1. Where bicycles are provided for the use of guests, the licence holder must
take all reasonable steps to ensure the safety of persons using them.
2. The licence holder shall ensure:
 That any bicycles provided are suitable for the use intended and for the
user.
 That, where cycle helmets are provided, they are suitable for the use
intended and the user.
Page 210

Page 211

37 
 That there is a programme of inspection and maintenance in place to
ensure that bicycles and cycle helmets are only made available to
guests when they are in a safe condition.
3. In complying with this condition, the licence holder shall have regard to the
Cycle Hire Guidelines of the Association of Cycle Traders.
Guest safety – outdoor play equipment
1. Where any outdoor play equipment is provided for the use of guests, the
licence holder must take all reasonable steps to ensure the safety of
persons using the play equipment.
2. The licence holder shall ensure:
 That only equipment which is suitable for the use intended shall be
installed and provided for the use of guests.
 That play equipment is installed and maintained in accordance with the
manufacturer’s instructions.
 That play equipment is subject to an inspection and checking regime in
accordance with the manufacturer’s instructions.
 That rules are in place and communicated to guests to ensure the safe
use of play equipment and to prevent its abuse.
3. In complying with this condition, the licence holder shall have regard to the
RoSPA Code of good practice for play areas and the RoSPA guidance on
the safe use of garden trampolines.
4. The provision for the use of guests of inflatable play equipment which is
intended for bouncing or climbing on is prohibited. This prohibition does not
apply to inflatable play equipment which, at all times when it is use, is
directly supervised by the licence-holder or their agent, or an employee of
the licence-holder or their agent. 
Page 211

Page 212

This page is intentionally left blank

Page 213

Appendix 3:   Post-consultation review of proposed fee structure for short-term lets 
This paper considers the banding and weighting of application fees for short-term let
licences in the light of the public consultation of the Council’s draft licensing policy.
The Scottish Government recommend that local authorities, at a minimum, establish a
licence fee structure that takes account of the following:
 the type of licence with lower fees set for home sharing and home letting
licences than for secondary letting licences; and
 guest capacity in terms of the maximum number of guests, as requested by the
host or operator on their application form. Note that some licences will be for
premises including significant numbers of unconventional accommodation, such
as pods or lodges on the same site where a caravan site licence is not otherwise
required.
The Council originally proposed to take account of these factors by applying weightings to a
unit cost, derived from that for processing a routine 4-guest secondary letting application, as
follows:
Table 1: Original bands and weightings
Guest capacity applied
for
Home sharing or
home letting licence
Secondary letting
licence
1 or 2 0.6 0.8
3 or 4 0.8 1.0
5 to 8 1.0 1.5
9 to 12 1.5 2.0
12 to 20 2.0 4.0
20+ 4.0 8.0
Following the public consultation, a review of responses concluded:
1. There was general agreement with this proposed approach, although concerns were
raised specifically about the bandings and the weightings to be applied to fees.
2. The bandings proposed were based upon the Scottish Government’s example
banded fee structure set out in the Part 2 Guidance, with two bands merged.
a. It was clear from the consultation responses that:
b. The bands are too narrow, and
3. The “standard” secondary let premises should be regarded as a three-bedroom
property that can sleep 6 persons, including children under the age of 10 years.
4. There was broad support from respondents for the weighted approach to setting
fees, although there was a wide range of opinion on the actual applied weighting
values.
5. Respondents challenged the Council’s assertion in the draft policy statement that
larger secondary letting premises would necessarily attract more objections and
representations, or require more work to process their applications. The Council
considers that larger premises are more likely to require physical site inspections as
part of the application determination process compared with smaller, more
conventional, premises and therefore an increased fee is proportionate and
appropriate.
6. The assessment of larger premises, accommodating more than, say, 12 persons will
probably bear comparison with the assessment of similar-sized houses in multiple
occupation. 
Page 213

Page 214

Having regard to these comments, the proposed revised bands and weightings are as
follows, noting that children under the age of 10 are to be included in the occupancy
capacity: 
Table 2: Revised bands and weightings
Guest capacity applied for
(including children under the age
of 10)
Home sharing or
home letting
licence
Secondary letting
licence
Up to 4 0.5 0.7
5 to 8 0.7 1.0
9 to 12 1.1 1.5
13 to 20 1.4 2.0
21 and over 1.8 2.5
The bands are simplified and the 5 to 8 band now represents a three-bedroom house
accommodating, for example, eight adults and children, subject to sufficient space and
sleeping accommodation.
The weightings for secondary let licences increase roughly proportionately with the number
of guests, rather than exponentially as in the original proposal. The maximum weighting is
therefore significantly reduced from 8.0 to 2.5 for the highest secondary letting band.
The discount for home sharing or home letting licences is 30% compared with an equivalent
secondary letting licence. Similarly, secondary letting licences for small premises
accommodating four or fewer guests are discounted by 30%. Weightings are rounded to two
significant figures.
The 21 and over band will include holiday villages with cottages or lodges in the same
curtilage and which do not hold a caravan site licence. It is expected that there will be very
few, if any, home sharing or home letting premises in the highest two bands. 
Level of fees
The level of fees has yet to be determined, It is worth comparing the licence fees charged for
other Civic Government licences by Argyll and Bute Council. These fall into three bands:
1. £524:
a. Second hand motor dealer
b. Metal dealer
c. Market operator
d. Public entertainment
e. Late hours catering
2. £452:
a. Taxi car
b. Private hire car
c. Second hand dealer
3. £275:
a. Boat hire
b. Street trader
c. Window cleaner
It is reasonable to expect the enquiries required for a short-term let licensing application to
be comparable with a public entertainment licence. There is a case for the fees for short-
term lets to align with other Civic Government licence fees charged by the Council. Applying
a standard fee of £524 (which is more appropriate given the complexity of STL applications)
is likely to result in over recovery of income, and therefore the mid range fee of £452 will be
used as the standard short-term let fee. Applying this to the bands and weightings, the
following fee structure arises (fees rounded to the nearest whole pound): 
Page 214

Page 215

Table 3: Proposed fees based on a standard fee of £452
Guest capacity applied for
(including children under the age
of 10)
Home sharing or
home letting
licence
Secondary letting
licence
Up to 4 £226 £316
5 to 8 £316 £452
9 to 12 £497 £678
13 to 20 £633 £904
21 and over £814 £1130
For comparison, the fee for an HMO licence for premises with 10 or more people is £1,101.
The lowest fee of £226 under this model compares with the lowest standard band of other
Civic Government licence fees of £275, such as for a window cleaner. 
Page 215

Page 216

This page is intentionally left blank

Page 217

1.0 EXECUTIVE SUMMARY 
1.1 This report details the proposed annual Strategic Housing Investment Plan which
will cover the period 2023/24 - 2027/28. The document is required to be submitted
to the Scottish Government by October 2022. This paper summarises the
proposals for the revised SHIP, in line with statutory requirements and the latest
guidance. 
In July 2021 The Scottish Government allocated Resource Planning
Assumptions (RPAs) to local authorities for the five years to the end of March
2026. The Scottish Government have confirmed that the figures for 2027 and
2028 can be based on the allocations from previous years although they are not
formal definitive allocations: 
Year 2023/24 2024/25 2025/26 2026/27 2027/28 Total
RPA £18.264m £18.328m £18.632m £18.632m £18.632m £92.488m 
1.2 In 2021/22, the SHIP delivered 143 new affordable homes. This SHIP identifies
potential for around 247 units to be completed in 2022/23 and over 750 additional
homes to be completed or approved in subsequent years. 
1.3 As well as addressing unmet local need and contributing to national targets, the
proposed programme will generate additional investment in the local economy,
supporting additional jobs including new apprenticeships in the construction
sector and associated labour market; it will stimulate community regeneration and
sustainability; it will help to attract and retain residents and employees for local
businesses; it will encourage movement within, and more effective operation of,
the local housing system; it will also contribute to improving general health and
well-being; and more pragmatically the new homes will also generate additional
Council tax revenue. 
RECOMMENDATIONS   
It is recommended that the Council:  
a) Approve the SHIP proposals summarised in this report, which will then be
submitted to the Scottish Government in October 2022. 
ARGYLL AND BUTE COUNCIL  COUNCIL
DEVELOPMENT AND 
ECONOMIC GROWTH 
29 SEPTEMBER 2022 
STRATEGIC HOUSING INVESTMENT PLAN (SHIP) 2023/24 - 2027/28 
Page 217 Agenda Item 14

Page 218

ARGYLL AND BUTE COUNCIL                                                              COUNCIL 
DEVELOPMENT AND ECONOMIC 
GROWTH                29 SEPTEMBER 2022 
STRATEGIC HOUSING INVESTMENT PLAN (SHIP) 2023/24 - 2027/28 
2.0 INTRODUCTION 
2.1 This paper seeks council approval of the revised Strategic Housing Investment
Plan (SHIP) 2023/24 – 2027/28 which will then be submitted to the Scottish
Government in October 2022. The core purpose of the SHIP is to set out strategic
investment priorities for affordable housing over a five year period to achieve the
outcomes set out in the Local Housing Strategy. 
2.2 The SHIP remains a continuous, iterative process: individual projects are subject
to a variety of factors which can lead to slippage or revision; and the overall
programme requires constant monitoring.   Formal updates are now required on
an annual basis. 
2.3 The revised SHIP has potential for delivery of around 247 units this year, and over
750 new affordable homes in subsequent years. 
3.0      RECOMMENDATIONS 
3.1  It is recommended that the Council: 
a) Approve the SHIP proposals summarised in this report which will then be
submitted to the Scottish Government in October 2022. 
4.0 DETAIL 
4.1 From 2017, the Scottish Government and COSLA/Association of Local
Authority Chief Housing Officers (ALACHO) agreed that SHIPs would revert to
being submitted on an annual basis. In June 2022 revised guidance was issued
to assist local authorities prepare their SHIPs, which require to be submitted to
the Scottish Government by October 2022, and will cover the period 2023/24–
2027/28. 
4.2 The Local Housing Strategy (LHS) sets out the strategic policy approach of the
council and its partners to delivering high quality housing and related services
across all tenures to meet identified need in the area. SHIPs are directly
informed by the LHS and its policies and are developed in consultation with key
stakeholders. Therefore, the SHIP is operational in nature and not considered
as a policy document. 
Page 218

Page 219

4.3 The core purpose of the SHIP remains to set out strategic investment priorities
for affordable housing over a five year period to achieve the outcomes
contained in the LHS. The plan reinforces the council as the strategic housing
authority; the importance of the outcomes and targets set out in the LHS; and
informs Scottish Government investment decisions. 
4.4 The SHIP should therefore:- 
 Set out investment priorities for affordable housing; 
 Demonstrate how these will be delivered; 
 Identify the resources required to deliver these priorities; and 
 Enable the involvement of key partners.   
The SHIP should contain a succinct narrative in PDF form, submitted as a
supporting document to the SHIP in the Housing and Regeneration
Programme (HARP) system, which explains the context to the SHIP including: 
 A statement on alignment with the LHS demonstrating that priorities
identified in the SHIP are consistent with what the local authority
outlined in its LHS (and any subsequent updates) and how the SHIP
priorities will contribute to delivery of LHS Outcomes;  
 A summary of the methodology used to prioritise projects; 
 Details of how the local authority has responded to and resolved
development constraints on projects prior to the site start date; 
 Details on how the local authority’s own resources and other funding
are supporting the delivery of affordable housing in its area;  
 Details of progress towards the delivery of its Affordable Housing
Supply Programme across all tenures by completions;  
 Details of affordable housing projects for Gypsy/Travellers;  
 Details of Housing Infrastructure Fund projects where these are linked
to affordable housing delivery;  
 Details of local plans to support the delivery of wheelchair accessible
housing within its area;   
 A statement that strategic housing priorities are aligned and are
consistent with Rapid Rehousing Transition Plan priorities;   
 Details of affordable housing projects that are aligned with the local
authority’s Child Poverty Action Report;   
 Details that duties under the Islands (Scotland) Act have been followed
by the local authority if appropriate;  
 Details of any empty homes services and actions to bring homes back
into use;  
 Details of how Council Tax on Second and Empty Homes has been
used to assist affordable housing;   
 Details of how Developer Contributions have been used to assist
affordable housing; and   
 The type and level of consultation undertaken with RSLs, communities,
developers and other stakeholders in developing the SHIP and how
this has helped with the development of strategic investment priorities.   
Page 219

Page 220

4.5  Key Aspects of the SHIP Guidance Issued in June 2022 
Building on previous guidance, the Scottish Government’s most recent
guidance includes an enhanced emphasis on ensuring that the SHIP is
aligned with the local Child Poverty Action report. The delivery of affordable
housing is key to efforts to alleviate poverty in general. 
The guidance also requires details on how the SHIP supports and enables the
local authority to deliver duties required under the Islands Act. 
The guidance continues to include an enhanced emphasis on the delivery of
wheelchair accessible housing in support of action 62 of the Fairer Scotland
for Disabled People Action Plan. 
The latest guidance also emphasises and includes specific linkages between
the SHIP process and the duty on local authorities to produce Rapid Rehousing
Transition Plans, essentially ensuring that the delivery of the SHIP will have
direct impact on homelessness in the local authority area. 
4.6 Resource Planning Assumptions (RPAs). 
In July 2021 The Scottish Government allocated Resource Planning
Assumptions (RPAs) to local authorities for the five years to the end of March
2026. The Scottish Government have confirmed that the figures for 2027 and
2028 can be based on the allocations from previous years although they are not
formal definitive allocations: 
Year 2023/24 2024/25 2025/26 2026/27 2027/28 Total
RPA £18.264m £18.328m £18.632m £18.632m £18.632m £92.488m 
It should be noted that this is potential investment for Argyll and Bute, dependent
on actual need and deliverability of suitable projects. While obviously very
welcome, this level of funding will also present real challenges for the Council and
its partners. This would be subject to sufficient complementary funding being
available from the Council and RSLs themselves to support the programme; and
the capacity of the constrained local construction industry to gear up to such an
enhanced level of productivity. 
4.7 Additional funding is required to complement the Scottish Government
investment, and in Argyll and Bute this includes a significant contribution from the
Council’s Strategic Housing Fund (SHF) as well as Housing Association
investment drawn from private sector borrowing. The council’s SHF is primarily
based on the revenue raised from reduced tax discounts on holiday and second
homes. The SHIP sets out plans to fully utilise the SHF over 5 years to support
the affordable housing development programme, including empty homes grants
and loans. The projected income to the SHF over the next 3 years is
approximately £2m per annum. An indicative estimate of around £2.29m would
be required to support in full the Scottish Government investment outlined in the
Page 220

Page 221

2023/24 RPA above based on the Scottish Government’s updated baseline
benchmark of £95 500 per unit. 
4.8 Consultation and Collaboration 
The preparation of the SHIP is intended to be viewed as a corporate activity
with close working relationships fostered across housing, planning, economic
development and other internal services. It is also crucial that the SHIP process
is based on collaboration between the Council, RSLs, communities,
developers, the Scottish Government and other stakeholders such as the
Health and Social Care Partnership; and that the SHIP document should
provide a detailed narrative about how consultation and collaboration has been
undertaken with all stakeholders. In Argyll and Bute, while the Council remains
the strategic authority with overall responsibility for the plan, local RSLs and
developers are engaged formally and informally throughout the process, and
do lead on delivering most of the individual projects. Regular review meetings
are held with SHIP officers from the Council, RSLs, and the Scottish
Government, and all proposals and decisions are considered by the
overarching, multi-agency Strategic Housing Forum. Updates are also being
tabled at local area community planning groups; and at the level of specific
projects, sites and settlements, a range of community representatives and
individual residents are routinely engaged and consulted. In recent years, a
number of local community councils and development trusts have pro-actively
engaged in the SHIP process, undertaking localised Housing Need and
Demand Assessments (HNDAs), with Council support, to feed into the process
and contributing to discussions on the project proposals. Additional
engagement has been promoted across the local business sector and a
network of employers and other interested parties has been established for
future consultation. 
4.9 A primary focus for the new SHIP has been engagement with the Health and
Social Care Partnership (HSCP) to ensure adequate specialist provision is
included in the new build programme. The HSCP’s new 3 year strategic plan
was launched in 2022 and incorporates a Housing Contribution Statement
(HCS) outlining the essential role housing plays in supporting and maintaining
independence, health and well-being of residents. The new LHS consolidates
the partnership working with the HSCP and sets out a high level outcome which
is: 
“To enable people with particular needs to live independently in their
own homes and to remain in their communities” 
The post of dedicated Housing Occupational Therapist which was established
in October 2018 to co-ordinate and promote these needs through the SHIP
group, was made permanent in 2021. 
4.10 Housing Infrastructure Fund (HIF) 
The Scottish Government introduced a Housing Infrastructure Fund in 2016 to
support housing development through dedicated loans and grants. The HIF will
Page 221

Page 222

prioritise sites which are of strategic importance and cannot proceed or have
stalled due to exceptional infrastructure works. The Council secured a £2.1
million HIF grant to address the costs of upgrade works at Kirk Road/Lorn Road. 
This work is now complete and has enabled delivery of the ongoing 300 unit
affordable housing development at Dunbeg, which remains a high strategic
priority for the council and its partners. The SHIP annual update contains
proposals for 3 further HIF projects in Argyll. 
4.11 Other Affordable Housing Provided Without AHSP Assistance 
SHIPs should contain details of all proposed affordable housing projects within
the local authority area including those which will be provided without AHSP
support. This could include off the shelf purchases, buybacks of ex-council/RSL
stock, projects where councils have exclusively used their own resources,
pension funds or other sources of funding, including Scottish Government non-
AHSP funds to develop housing. 
The Council will continue to explore these and all other appropriate options to
increase the supply of affordable housing. The Council agreed an Open Market
Purchase Statement with the Scottish Government in January 2022. 
SHF has contributed to 1 Rural and Islands Housing Fund projects in Argyll
during 2022 – the refurbishment of 6 properties for affordable rent on Ulva
through the North West Mull Community Woodland Company (NWMCWC). In
addition a Community Housing Network Group has been established by the
Council to support community groups to take forward housing projects which
meet identified need. 
The potential impact of the proposed Rural Growth Deal (RGD) for Argyll and
Bute will be significant, and the SHIP and the housing sector in general can
contribute to this strategic agenda. 
4.12 Current Progress: Outputs 2021/2022 
Table 1 details the affordable housing delivered by the SHIP in 2021/22. 
TABLE 1:  SHIP New Build Homes by HMA & Project, 2021/22
Housing Market
Area
Projects Completions % of total
Cowal Cairndow (FYNE HOMES) 6 4%
Lorn Kirk Road (Dunbeg) (WHHA) 4 3%
Dunbeg Phase 3 (LINK) 115 80%
Helensburgh and
Lomond
Garelochhead (ACHA) 10
7%
Islay, Jura and
Colonsay
Imeraval Phase 3 (WHHA) 8
6%
TOTAL 143 100% 
Page 222

Page 223

4.13 The Revised SHIP Programme 
The current year, 2022/23, is covered by a Strategic Local Programme
Agreement while the new SHIP is intended to commence from 2023/24. The
following tables summarise all proposals at the time of writing, including those
projects which were completed in the first quarters of this year and for which
funding has already been drawn down. It should be noted that the status of
many future projects, particularly in the later years, remains provisional and
purely indicative at this stage; some may not proceed within the timescale.
However there is also scope for additional proposals to be brought forward or
included in earlier years. 
TABLE  2: SHIP Projects Completions/Anticipated Completions in 2022/23
Project address Developer Units Anticipated
Completion Date
Inveraray Phase 2 ACHA 10 Completed June
2022
Tarbert  ACHA 4 Nov 2022
Millknowe Campbeltown ACHA 2 Nov 2022
Tom-A-Mhoid Road Dunoon FYNE HOMES 1 March 2023
Dunbeg Phase 3 (remaining
units) LINK 185 March 2023
Sawmillfield Helensburgh WHEATLEY GROUP 36 March 2023
Jura  WHHA 10
Completed July
2022
Argyll & Bute 2022/23 Total Completions (est.) 248 March 2023 
TABLE 3: SHIP Core Programme - Potential Completions by March 2028
Project address Developer Units Anticipated
Completion1
Bowmore Phase 4 ACHA 18 Year 1 (23/24)
Eton Avenue Dunoon  ACHA 4 Year 1 (23/24)
North Connel - Phase 2 ACHA 2 Year 2 (24/25)
Tighcargaman Port Ellen   ACHA 20 Year 2 (24/25)
Dalintober  ACHA 25 Year 2 (24/25)
Coll  ACHA  10 Year 2 (24/25)
Tarbert ACHA 15 Year 2 (24/25)
Tarbert ACHA 15 Year 3 (25/26)
Keills  ACHA 4 Year 4 (26/27)
Jeanie Deans Helensburgh DUNBRITTON HA 12 Year 1(23/24)
Helensburgh Golf Club DUNBRITTON HA 62 Year 1 (23/24)
18th Tee, Helensburgh DUNBRITTON HA 16 Year 1 (23/24)
Cardross DUNBRITTON HA 37 Year 3 (25/26)
Succoth Phase 2, Arrochar DUNBRITTON HA 12 Year 4 (26/27)
Lochgilphead Riverside Drive
Baddens FYNE HOMES 6 Year 1 (23/24)
Inveraray Phase 1 FYNE HOMES 16 Year 1 (23/24)
Ballochgoy Rothesay FYNE HOMES 10 Year 1 (23/24)
Page 223

Page 224

Rothesay Academy Phase 1 FYNE HOMES 30 Year 2 (24/25)
Inveraray Phase 2 FYNE HOMES 10 Year 2 (24/25)
Rothesay Academy Phase 2 FYNE HOMES  20 Year 4 (24/25)
Cairndow Phase 2 FYNE HOMES 4 Year 5 (27/28)
Tighnabruaich Phase 2 FYNE HOMES 10 Year 5 (27/28)
Dunbeg Phase 4 LINK 90 Year 2 (24/25)
Rosneath LINK 49 Year 3 (25/26)
Hospital Field site Oban LINK 50 Year 3 (25/26)
Lonan Drive Oban  LINK 44 Year 3 (25/26)
Glencruitten LINK 100 Year 4 (26/27)
Dunbeg Phase 5 LINK 75 Year 4 (26/27)
Dunbeg Phase 6 LINK 75 Year 5 (27/28)
Port Charlotte Phase 1 WHHA 14 Year 1 (23/24)
Imeraval Phase 4 Islay WHHA 20 Year 1 (23/24)
Tobermory Phase 3  WHHA 12 Year 2 (24/25)
Port Appin Phase 1 WHHA 6 Year 2 (24/25)
Craignure  WHHA 22 Year 2 (24/25)
Colonsay WHHA 5 Year 2 (24/25)
Salen WHHA 8 Year 3 (25/26)
Port Appin Phase 2 WHHA 24 Year 5 (27/28)
Bunessan Phase 2 WHHA 4 Year 5 (27/28) 
Argyll and Bute Total  956 2023-2028 
1 NB. Timescales are indicative and subject to change; and will be monitored on a
regular basis. Some projects could also revise their final number of units. 
4.14 Alternative sites are also being considered either to replace or enhance some
of the sites listed in above tables. The Council also continues to provide support
for communities considering the use of the Government’s Rural and Island
Housing Funds and other resources to deliver affordable housing out with the
core AHSP development programme. The table below provides details of these
projects. 
TABLE 4 : Community Housing Projects
HMA PROJECT/COMMU
NITY
UNITS
Mull & Iona Ulva (Refurb) 6
Mull & Iona Glengorm (Refurb) 5
Islay, Jura &
Colonsay
Port Askaig, Islay 2
Islay, Jura &
Colonsay
Scalasaig, Colonsay
Phase  1
12 units in total made up of
3 Self build plots, 
3 Private Rented units (Mowi) 
6 affordable housing units of which 4 are social
rent and 2 are shared equity 
Argyll and Bute Total 25 
Page 224

Page 225

4.15 Impact Assessments 
In preparing the SHIP, as in all aspects of housing policy and planning, the
Council has taken account of the housing needs of all the communities we
serve, and continues to address equalities issues and adhere to principles of
diversity and inclusion. In addition to the robust baseline evidence of specialist
accommodation and support needs across the range of equalities client groups
contained in the HNDA, the Council is proactively pursuing engagement with
the Health and Social Care Partnership to inform the SHIP programme. An
overarching equality impact assessment will be completed for the LHS and this
will inform our assessment of the impact of the SHIP, and how the strategic
aims are embodied in the housing priorities of the programme. Housing
Services will also consider requirements for Health Inequalities Impact
Assessments, Child Rights and Wellbeing Impact Assessments or other
potential policy implications. However, as the responsible authority for the
purposes of the relevant 2005 Act, the Council has determined that a Strategic
Environmental Assessment (SEA) is not required for the LHS or SHIP. 
5.0 CONCLUSION 
5.1 The Scottish Government will review the SHIP in line with the process agreed
jointly with COSLA. Their appraisal will therefore take account of the following: 
the extent to which the SHIP delivers LHS Outcomes; the extent to which it is
feasible to deliver; the local authority’s contribution to the delivery of the
programme, both in terms of its facilitation role and in terms of maximisation of
resources; evidence that the Council is supporting the efficient delivery of the
SHIP; evidence of stakeholders’ involvement in developing the SHIP and in the
implementation of proposals; and the extent to which it takes account of equality
issues. In March 2021, the Scottish Government provided positive feedback on
the previous SHIP, submitted last year, and their comments have also continued
to inform this latest version of the SHIP moving forward. 
5.2 It is recognised that an adequate supply of suitable housing is becoming an
increasing pressure within Argyll and Bute. The Council is fully committed to, and
actively exploring, all opportunities to enable housing delivery which meets the
identified need and demand across the local authority area. 
6.0 IMPLICATIONS   
6.1  Policy - Proposals are consistent with current Council policy, including the
revised policy in respect of the use of Strategic Housing Fund monies. The
SHIP supports the Local Housing Strategy vision and outcomes which are
directly aligned with the overarching objectives of the Outcome Improvement
Plan, in particular Outcome 2 – we have infrastructure that supports
sustainable growth. 
Page 225

Page 226

6.2  Financial - The proposals are based on the Resource Planning Assumptions
provided by the Scottish Government; the Strategic Housing Fund and RSL
private finance. There will be an ongoing requirement to retain and target SHF
resources to support the proposed programme. 
6.3  Legal - The submission of the SHIP will meet our statutory duties, and following
its approval, Strategic Local Programme Agreements will be concluded
between the Council and Scottish Government. 
6.4  HR – None.   
6.5   Fairer Scotland Duty - The proposals are consistent with aims and objectives
set out in the local housing strategy, which is subject to an EQIA.   
6.5.1  Equalities Protected characteristics - There are targets set within the SHIP to
deliver housing which meet the needs of specialist groups.   
6.5.2  Socio-economic Duty – The delivery of affordable housing across Argyll and
Bute facilitates socio-economic opportunities for all. The SHIP links with the
Child Poverty Strategy. 
6.5.3  Islands – The Housing Needs and Demand Assessment process takes full
account of housing need on the islands. New build developments on the islands
are included in each of the SHIP tables. 
6.6  Climate Change – All new build properties delivered through the SHIP are built
to a Greener Standard. 
6.7  Risks – Risk assessment is an integral part of each development and will be
considered as the programme moves forward. The SHIP is required to show
how risk will be managed. Failure to deliver a robust SHIP could result in loss
of substantial government investment for the local authority area. Alternatively,
however, failure to forward plan judiciously and to programme development in
line with identified needs could result in over supply; generating imbalances in
the local housing market, and creating risks for RSLs and the management of
their existing stock, with consequent adverse effects on local neighbourhoods
and communities. 
6.8  Customer Service - The proposals will deliver increased access to a range of
suitable, affordable housing options. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Councillor Robin Currie, Policy Lead for Economy and Rural Growth   
September 2022 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth   
Fergus.Murray@argyll-bute.gov.uk 
Page 226

Page 227

Douglas Whyte, Team Lead – Housing Strategy
Douglas.Whyte@argyll-bute.gov.uk 
Appendix 1 – Argyll and Bute Strategic Housing Investment Plan 2023/24 – 2027/28 
APPENDIX 1 – ARGYLL AND BUTE STRATEGIC HOUSING INVESTMENT PLAN
2023/24 – 2027/28 
Page 227

Page 228

ARGYLL and BUTE
STRATEGIC HOUSING INVESTMENT PLAN
2023/24 - 2027/28 
Page 228

Page 229

CONTENTS 
SECTION PAGE      
INTRODUCTION 
1) The Strategic Framework 
2) Stakeholder Consultation 
3) Prioritising the Programme 
4) Delivering the Programme: Mitigating Risks and Resolving
Development Constraints 
5) Resourcing the Programme and the Council’s Contribution 
6) Empty Homes 
7) Child Poverty and Fuel Poverty 
8) Specialist Provision including Wheelchair Habitable Housing 
9) Gypsy/Traveller Sites 
10) Homelessness/ Rapid Rehousing Transition Plans 
11) Buybacks, Second-Hand Acquisitions and Off-Shelf 
12) Update from the Previous Ship 
13) The Revised Programme 
14) Monitoring and Review and Impact Assessments 
CONCLUSION 
Appendices 
Page 229

Page 230

Helensburgh
& Lomond 
Bute &
Cowal 
Mid-Argyll,
Kintyre & Islay
Oban, Lorn &
the Isles 
MULL
Tobermory
Oban
Campbeltown
Bowmore
Rothesay 
Helensburgh Lochgilphead 
COLL
TIREE 
COLONSAY
GIGHA
IONA
BUTE
ISLAY
JURA 
The focus of the Strategic Housing Investment Plan (SHIP) is affordable housing
provision via new build, replacement, rehabilitation or re-modelling. 
“Affordable housing” in this context refers to accommodation made available
at a cost below full market value to meet an identified need and includes: 
 Social rented housing. 
 Subsidised low-cost housing for sale (discounted, shared ownership or
shared equity);
 Low-cost housing without subsidy (entry level housing for sale); and
 Mid-market rental housing provided by social landlords.” 
Guidance on the Preparation of Strategic Housing Investment Plans,   
Scottish Government, July 2016 
AFFORDABILITY – as a basic rule of thumb, an affordable house price is reckoned to
be no more than 3.5 times the annual income of the household; and in terms of renting a
property, the affordable benchmark is often considered to be around 25% of the
household’s income.
Page 230

Page 231

Argyll and Bute Council remains committed to working closely with the Scottish
Government, local housing associations, and other key partners to increase the
effective supply of affordable homes across the local authority area so that
everyone can access a good quality affordable home that meets their needs. 
The Strategic Housing Investment Plan (SHIP) is a key local authority
document which identifies priority housing projects to support the delivery of
local and national strategic housing targets, as well as helping to increase the
supply of housing across other tenures as appropriate. 
The Local Housing Strategy (LHS) sets out the strategic policy approach of the
council and its partners to deliver high-quality services across all tenures and
meet identified needs in the area. The strategy and its associated policies
directly inform the SHIP.   
This plan is an operational document, setting out how it will deliver the LHS
priorities and outcomes through a five-year strategic investment programme. It
reinforces the council’s role as the strategic housing authority; and informs
Scottish Government housing investment decisions. It also underpins the
preparation of Strategic Local Programme Agreements (SLPAs). 
Specifically, the SHIP is the key document for identifying: 
 proposed strategic housing projects which require funding from the
Scottish Government’s Affordable Housing Supply Programme;
 proposed affordable housing projects which can be provided without
Scottish Government funding support; and
 projects across all tenures requiring grant and loan funding from the
Scottish Government’s Housing Infrastructure Fund. 
This SHIP builds on the previous SHIP published in 2021 and has been
developed in consultation with key stakeholders. The outline draft plan was also
approved by the SHIP Officers’ Group and the Strategic Housing Forum in
2022, and the finalised SHIP was approved on **** 2022 by the full council for
submission to the Scottish Government.    
INTRODUCTION     
This SHIP covers the five years from 2023/24 to 2027/28.
Page 231

Page 232

The SHIP narrative provides a context to the SHIP and includes the following: 
 A statement outlining the role the SHIP investment priorities plays in
delivering LHS outcomes.
 Details of stakeholder consultation undertaken in developing the SHIP.
 A summary of the project prioritisation framework, including:
 Prioritisation by unit size;
 Prioritisation by how the project addresses duties placed on the council by
the Islands (Scotland) Act; and 
 The council’s investment priorities for housing in town centres
 A list of the risks and key issues constraining the delivery of the programme
and identifying the actions that are required to mitigate against these
constraints. For example, using different construction methods to deliver
SHIP projects.
 Resourcing the programme, including : 
 Details of how the council’s own resources, such as Council Tax on
Second and Empty Homes, support affordable housing delivery;
 Details of other funds that are supporting the delivery of affordable
housing;
 Details of Developer Contributions that have been used to assist
affordable housing delivery; and 
 The role of the Housing Infrastructure Fund in delivering new
affordable housing.
 A summary of the empty homes services and actions being taken by the
council to bring homes back into use.
 Aligning the SHIP programme with the requirement specified in the Argyll
and Bute’s Child Poverty Action Report.
 Details of specialist housing provision delivered over the SHIP period,
including wheelchair-accessible housing. 
 An outline of capital works undertaken on Gypsy/Traveller sites and if the
Gypsy/Traveller Accommodation Fund may fund future works.
 Outlining how the strategic housing priorities are aligned with Rapid
Rehousing Transition Plan priorities.
 A statement on the council’s approach to buybacks, second-hand
acquisitions and off-the-shelf purchases. 
 A review of the previous SHIP (published in 2021)
 A summary of the projects in this SHIP. Full details of these projects can be
seen in the Scottish Government’s electronic system HARP (Housing And
Regeneration Programme)
 Details of how the SHIP will be monitored and reviewed including how the
SHIP programme impacts upon:
 Equalities and Socio-Economic Impact Assessment 
 Child Rights and Wellbeing Impact Assessment
 Health Impact Assessment 
 Islands and Communities Impact Assessment 
 Strategic Environmental Assessment 
Page 232

Page 233

 Argyll & Bute Outcome Improvement Plan (ABOIP) 
Six long-term outcomes underpin this objective: - 
While the housing sector has a role to play in achieving all of these outcomes, the
provision of affordable new build housing, particularly the delivery of the SHIP,
primarily focuses on Outcome 2 (infrastructure supporting sustainable growth). 
1) THE STRATEGIC FRAMEWORK 
The Argyll and Bute Outcome Improvement Plan 2013-
2023 sets out the Community Planning Partnership’s
(CPP) vision for achieving long term outcomes for
communities in Argyll and Bute. As the overarching
strategic document for local partners, including the council,
it provides the high-level context for a wide range of
strategies, plans and policies, including both the Local
Housing Strategy and the SHIP. 
The council and its partners are soon to commence their
review of the current Outcome Improvement Plan and aim
to publish the refreshed document in 2023. Future SHIPs
will align with the new Local Outcome Improvement Plan. 
The overall objective of the plan for the 10 years to 2023 is – 
Argyll and Bute’s economic success is built on a growing population.
In Argyll and Bute:
1. The economy is diverse and thriving.
2. We have infrastructure that supports sustainable growth.
3. Education, skills and training maximises opportunities for all.
4. Children and young people have the best possible start.
5. People live active, healthier and independent lives.
6. People live in safer and stronger communities 
Page 233

Page 234

 Local Housing Strategy (LHS) 2022/23-2026/27 
Underpinning this vision are four high-level outcomes: 
The SHIP continues to play a key role in promoting the overall LHS vision and
delivering on LHS, particularly outcome 1 (Supply and Place Making).   The
council developed a new HNDA in 2021, which the Scottish Government
subsequently approved. The council’s LHS housing supply target of providing
1075 affordable homes from 2022/23 to 2026.27 (215 homes per year) which is 
significantly higher than the baseline HNDA estimate to take account of local and
national strategic aspirations for repopulation, economic recovery, and overall
growth throughout the authority area. 
 Housing supply target 2022/23 to 2026/2027 is 1,450 units across
all tenures (290 per annum). 
 Affordable housing supply target 2022/23 to 2026/27 is 1,075  (215
per annum) 
“Everyone in Argyll & Bute has access to a suitable, high-
quality home which is affordable and located within a
vibrant, sustainable and connected community.” 
1) Housing Supply and Place Making
2) House Condition, Energy Efficiency and Poverty
3) Specialist Provision and Independent Living
4) Housing Options, Information and Support
The Council continues to ensure that the investment
programme and priorities set out in the SHIP are
consistent with the vision, aims and objectives of the
LHS; and that these build on the latest Housing Need
and Demand Assessment (HNDA). Existing strategic
priorities and outcomes continue to be ratified and
supported by partners and stakeholders via the Argyll
and Bute Strategic Housing Forum. Earlier in 2022
the council published it’s new LHS which covers a
five-year planning period from 2022/23 to 2026/27.
The LHS sets out an updated core vision: 
In summary, the SHIP will aim to deliver sufficient suitable and
affordable new homes to attract and retain young people and families,
to support a sustainable and thriving business sector, and to meet the
needs of the elderly/ageing population, and those with particular
needs.
 Potentially, up to 10% of the five-year provision could be for
alternative tenures such as shared equity; and
 10% should comprise some form of “specialist provision”
including 5% which should be fully wheelchair habitable. 
Page 234

Page 235

Scottish Government Priorities and COHI.
One of the Scottish Government’s priorities is to ‘support a more balanced
population across Scotland.’ To achieve this aim, the Scottish Government has
developed a strategy called- ‘A Scotland for the future: Opportunities and
Challenges of Scotland’s Changing population’ to ensure all areas have a more
balanced population “so all our communities can flourish”. 
The Scottish Government’s National Islands Plan aims to address population decline
and ensures a healthy, balanced population profile. In particular, the National Islands
Plan commits to supporting the repopulation of rural and island communities. 
Housing to 2040 aims to deliver the vision for everyone in Scotland, including island
communities, by understanding and identifying what positive measures need to be
taken forward to address, promote and ultimately reduce inequality in housing
outcomes across all housing tenures by 2040 and build strong sustainable
communities. 
The Convention of the Highlands and Islands (CoHI) aims to address the Scottish
Government’s priorities outlined above by establishing a population working group
which recommended that pilot projects were established to tackle depopulation. The
council is a member of CoHI and is participating in the pilot projects. The council has
identified the following areas as repopulation zones: 
•          Rosneath Peninsula 
•          Kintyre (Tarbert to Southend)
•          Tiree and Coll 
•          Bute 
A settlement officer has been employed on a one-year contract to examine the
availability and quality of housing across Argyll and Bute and factors such as cost,
land supply, and infrastructure barriers. The findings from this project will inform
housing investment decisions and future SHIPs. 
As outlined in previous SHIPs, the preparation of this plan, as well as the planning
and delivery of individual projects, remains a continuous, iterative corporate activity.
Since 2019, close working relationships have been further enhanced and streamlined
as the council’s service restructuring brought Housing and Planning Services together
with Economic Development and Regeneration in a single department of
Development and Infrastructure under one Head of Service. In addition, the internal
joint working will include ad hoc involvement of other departments such as Roads,
Property Development/ Estates when appropriate. The SHIP process reflects a strong
collaborative approach with Registered Social Landlords (RSLs, or housing
associations), the Scottish Government, communities, developers and other
stakeholders. 
2) STAKEHOLDER CONSULTATION
Page 235

Page 236

Key partners include: 
 The Scottish Government: More Homes Scotland Division
 Argyll & Bute Council
 Argyll & Bute Health & Social Care Partnership
 Argyll Community Housing Association
 Fyne Homes Housing Association
 Dunbritton Housing Association
 West Highland Housing Association
 Link Group Ltd
 Wheatley Group
 Loretto Housing Association 
 Bield Housing Association
 Trust Housing Association
 HMNB Clyde/ MOD 
 Loch Lomond & Trossachs National Park
 Rural Housing Scotland 
 Communities Housing Scotland.
 Highlands & Islands Enterprise
 Veterans Housing Scotland
 Scottish Water
 Home Energy Scotland
 ALIenergy 
At the very local level, on a site-by-site basis, RSLs and Council officials continue to
liaise closely with private developers, local landowners, local community groups and
development trusts, and a range of other stakeholders to negotiate, facilitate, enable
and deliver viable projects within the context of the LHS and the framework of the
SHIP. Updates are also being tabled at local area community planning groups.
Community representatives and residents are routinely consulted regarding specific
projects, sites and settlements. 
The Argyll & Bute Strategic Housing Forum, comprising a wide range of key
partners from the Community Planning Partnership, constitutes the overarching
Housing Market Partnership with ultimate responsibility for overseeing the
implementation and monitoring of the LHS and the SHIP; and is chaired by the Council
Leader. The Strategic Housing Forum is also responsible for making appropriate
recommendations to Council Members and lobbying the Scottish Government
regarding housing issues in Argyll and Bute. The Terms of Reference for the Forum,
as the formally constituted local housing market partnership within Argyll and Bute,
were reviewed and agreed upon in September 2020 and are available on request to
the council.
The SHIP Officers Development Group - In addition to regular programming
meetings between the council, the Scottish Government and individual RSLs, a
dedicated SHIP Officers Group continues to bring practitioners from all these parties
together on a quarterly basis to address and progress operational development
matters which are then reported to the overarching Strategic Housing Forum. In
2018/19, a secondary SHIP Partners Group was convened involving other partners
Page 236

Page 237

such as infrastructure services (Roads and Amenities) and agencies such as Scottish
Water to consider specific project-based issues. This proved successful in addressing
specific constraints and has now been incorporated, as appropriate, within the SHIP
Officers Group and the Strategic Housing Forum.
Community Housing Network Group- Argyll and Bute Council, as the strategic
housing authority, recognises the importance of community groups and their role in
delivering affordable housing. The Community Housing Network Group (CHNG) was
established to improve communication and partnership working. The group exists to
fulfil the following aims: 
 Provide a forum for community groups interested in developing affordable
housing to come together and discuss important aspects of their work to
deliver housing solutions in their communities;
 Provide guidance to the community groups on relevant areas of policy and
practice; 
 Facilitate external speakers on areas of subject expertise relevant to the
group members; and
 Encourage sharing complex issues between members, understanding that no
one organisation has all answers.
Various community groups within the network have successfully attracted funding
from the Rural and Islands Housing Fund or the Scottish Land Fund to provide
affordable housing. More details are outlined in Section 5. 
Rural Growth Deal (RGD) Housing Sub-group- The Rural Growth Deal housing
sub-group aims to provide affordable housing for workers to enable businesses to be
sustainable or grow. The proposal is to 
 construct housing for sale at an affordable price;
 place rural burdens and planning conditions on homes financed by the Rural
Growth Deal to ensure they are used as principal housing for residents and
workers; and
 develop proposals relating to portable worker accommodation and support
employers to furnish properties for staff. 
Argyll and Bute Child Poverty Action Group- The Argyll and Bute Child Poverty
Action Group recognises that it is vital that the council, Health Board, the third sector
and communities work together to tackle child poverty. Housing is an essential
component in tackling child poverty; hence, the service has been represented in the
group since its inception. However, in 2021/22, the Housing Policy and Strategy Team
joined the group to ensure that housing investment and key policies prioritised tackling
child poverty. The SHIP will deliver housing investment, enabling some families to be
allocated affordable, energy-efficient homes. 
Page 237

Page 238

Health and Social Care Partners 
To realise this vision, people need access to appropriate housing models and care
staff to enable them to live at home or in a homely setting. The balance between care
in residential and community settings has already shifted considerably towards looking
after people at home. This is evidenced by 53% of those aged 65+ who require 10+
hours of home care per week being looked after at home1. However, expanding care
at home is restricted by staff numbers and the Health Board claims that a lack of
affordable housing is a barrier to enabling it to attract health and social care staff. The
SHIP and Rural Growth Deal will provide affordable homes which could attract health
and social care staff to the area. In addition, the delivery of suitable specialist provision
via the SHIP programme will be critical to enabling people with needs to live
independently in their own home. 
A dedicated Housing Occupational Therapist (OT) post was created to take this
agenda forward and cement the close partnership between the council, RSLs and the
HSCP. This includes reviewing the circumstances and requirements of families with
particular needs, developing a better understanding of the accommodation and
support needs of wheelchair users, and facilitating early interventions, particularly
concerning adaptations and property layouts and design. One innovative outcome of
this joint work was delivering a cross-sectoral training programme for partners. This
will also help inform the SHIP process and promote greater engagement across the
board. 
The Housing OT and relevant HSCP officers will continue participating in the SHIP
Operational Group and the Strategic Housing Forum. In 2021, the council approved
the recommendation that this post should become permanent, funded by Housing
Services. The Housing OT and the LHS strategy team worked together to conduct
research and consultation with wheelchair users across Argyll and Bute. This research
helped identify specific new build targets for wheelchair accommodation, which have
been incorporated into this plan and take immediate effect in respect of the SHIP                                                                 
1 Health and Social Care Joint Strategic Plan 2022-25
As a priority, the Council continues to foster
closer engagement with the Health & Social
Care Partnership (HSCP) at all levels (from
senior management group to locality planning
groups). The HSCP’s current three-year
Strategic Plan was launched in 2022,
incorporating a revised and updated Housing
Contribution Statement (HCS) which outlines
the essential role that housing plays in
supporting and maintaining independent
living and the health and wellbeing of
residents. The SHIP has a direct and
significant contribution to make to this
outcome.
“People in Argyll and Bute will live longer healthier
independent lives”
Page 238

Page 239

programme. In 2021, Council Housing Services appointed a dedicated Mental
Health/Addictions Housing Practitioner focused on supporting the delivery of the
Rapid Re-housing Transition Plan, further enhancing the strategic and operational
links between housing, health and social care. 
Wider Stakeholders, Local Business, and Economic Development - Other
stakeholders and strategic partners will be engaged on an ad hoc basis as
appropriate. Increasingly, given the overarching strategic imperatives, economic
development and regeneration partners are also emerging as key associates in the
SHIP and LHS process. This has led, for instance, to an ad hoc working group
(facilitated by Housing, Economic Development and HIE) co-ordinating dedicated
events in August 2018 and September 2019, for local employers and representatives
of the business sector to engage with housing providers and explore innovative
delivery mechanisms and opportunities such as the Rural Growth Deal. The events
also provided networking opportunities for local community representatives as well as
RSLs (which of course constitute local, community-based and focused organisations
and charitable associations in their own right). In total, over 50 organisations,
agencies, services and individuals attended the events, and the intention is to retain
this network as one thematic interest group for future consultation and engagement
when developing the next Local Housing Strategy. This consultation exercise informed
the Rural Growth Deal. The council commissioned research in Mull, and this further
engaged the business sector. 
Community Engagement - In addition to the above, the council has recently
reviewed and updated its approach to localised housing need and demand
assessment, building on a number of years’ experience with community councils,
development trusts, local study groups, green belt groups, tenants and residents’
associations, and various other local bodies across mainland Argyll and throughout
the islands. The result is a detailed resource for local communities and third-party
support agencies to carry out surveys, stakeholder engagement, and data analysis,
with the support of council staff, in order to assemble the crucial, “high quality, fit for
purpose” evidence base required to secure public funding and help to deliver practical
housing solutions[1]. The council has engaged with local representatives on Mull, and
community councils in North Lorn, for instance, to implement the new toolkit; and this
is now available. 
HMNB Clyde / MOD engagement-As reported in previous SHIPs, the Strategic
Delivery and Development Framework (SDDF) was established between the Council
and HMNB Clyde to achieve maximum benefit for the base the wider community as a
consequence of the proposals for increasing the naval presence at Faslane. This
dedicated working group continues to explore the potential accommodation needs
arising from the development of the naval base as the Royal Navy’s UK Submarine
Centre of Specialisation and the consequent economic impact this is likely to have in
the local area. The SHIP is therefore required to take full account of the associated
emerging accommodation needs in the Helensburgh and Lomond area. To this end,
a comprehensive housing market study of the area was completed in 2018, which
involved further extensive consultation and stakeholder engagement. Additionally, the
council is conducting a wider economic study in partnership with the MOD.                                                                 
[1] The Argyll and Bute Community Housing Assessment Toolkit (CHAT) is available on demand from Council
Housing Services. See contact details on the final page of this Plan.
Page 239

Page 240

A key issue in relation to housing and potential requirements for the SHIP is the
implementation of the Future Accommodation Model (FAM), which the MOD is piloting.
The 2015 Strategic Defence and Security Review (SDSR) committed the Ministry of
Defence to make a new accommodation offer to help more service personnel live in
private accommodation and meet their aspirations for home ownership. The way
people live, and work is changing, and the FAM reflects this, giving more choice to
more Service personnel and their families over where, how and with whom they
live.  The pilot is a chance for the MOD to test the policy and how it is delivered before
deciding whether to roll it out across the UK. If this is confirmed, the majority of bases
will gradually transition to the FAM over the next decade or two. The FAM pilot was
launched in September 2019 for the Faslane site, and this will have a direct impact on
the Helensburgh & Lomond housing market area and beyond. Ensuring sufficient and
suitable capacity within the local housing system to address the anticipated increased
demand will be a priority for the SHIP over the next 5 – 10 years. 
In addition, the council has carried out a dedicated in-house study of the particular
needs of veterans and serving military personnel more widely, i.e., beyond those
based at or leaving Faslane; the results informed the new HNDA in 2021 and LHS in
2022. This has involved engagement with local and national organisations such as
Veterans Housing Scotland and Poppy Scotland, among others.
hnda_technical_paper_09_-_veterans_and_armed_services.pdf (argyll-bute.gov.uk) 
The SHIP has a clear and transparent framework for prioritising projects to be
delivered. Investment is targeted at Housing Market Area’s (HMA), communities and
settlements where communities experience the greatest affordable housing
pressures. These priorities recognise the importance of investing in smaller, fragile
rural communities as well as larger urban areas. The communities have been
identified by consideration of: 
 the relative and absolute pressure on the existing affordable housing; 
 the ability to meet the need in the wider housing market area;  
 recent investment patterns;   
 deliverability (site ownership, infrastructure or planning constraints, etc.);
 the potential contribution to population and economic growth. 
3) PRIORITISING THE PROGRAMME 
Page 240

Page 241

Given that localised “hotspots” or pressured areas may still be masked within the wider
geographic HMAs, a further refinement of the evaluation process is also required at
the localised settlement (or letting area) level to reflect the complex rural and island
geography of Argyll and Bute. Therefore, the council continues to employ the following
key indicators: - 
Prioritisation by Housing Need – 
Dunbeg remains the immediate development priority for the council, although the
SHIP has several other projects in and around Oban. 
Strategically, Helensburgh & Lomond is also a high priority in terms of need and
potential growth opportunities. Critically, the impact of the increased MOD presence
at the Faslane naval base and the consequential impact from families and
dependents, as well as enhanced supply-chain requirements servicing the base, will
inevitably result in additional accommodation pressures within this catchment area. 
The LHS concluded that Mid Argyll could benefit from further developments, albeit
this continues to be closely monitored to avoid creating imbalances in the existing
system. Cowal is currently most at risk of severe depopulation. However, it could be
regenerated with judicious development, operating in tandem with improvements in
employment opportunities and transport infrastructure. There are particular needs in
this HMA for a few larger families who require specialist provision. 
Small-scale developments could also significantly and positively impact the Atlantic
Islands, which is also the case throughout the rural mainland. Bute and Kintyre
appear to be relatively well balanced in terms of current supply and demand (with
annual RSL lets sufficient to address waiting list demand and ongoing evidence of
Criteria Indicator/Evidence
Identified need  HNDA & local updates – total shortfall in affordable housing.
Pressure ratios  CHR - waiting list applicants per available let on annual basis.
Homeless
Pressure  
HL1 statistics - applicants & time to close cases; temporary
accommodation; % of RSL lets to homeless cases.
Social stock
levels
Proportion of existing RSL stock to total number of dwellings on
Council Tax Register.
Wider 
Strategic 
Fit
Synergies with LDPs; economic development plans or
regeneration initiatives; the local improvement plan; and the
primary objective of reversing population decline.
Specialist
Provision 
HNDA/CHR/Health & Social Work caseload – total shortfall for
special needs accommodation & evidence from waiting lists or
bespoke research.
Risk/
Deliverability
Satisfies key development criteria (site ownership; planning
consent; resourced; infrastructure constraints; contractor
capacity). Early liaison with planning remains critical.
Affordability (of
proposed rent)
Compared to Scottish Govt. benchmarks and other RSL rents;
as % of LHA; and as % of local household incomes.
Page 241

Page 242

long-term voids in these areas, despite recent strategic stock rationalisation
programmes). Nevertheless, emerging analysis suggests these local housing
markets have also been experiencing significant shifts in demand, and potential
needs may be evolving and growing, particularly as a consequence of the Covid
pandemic. 
The recently published Mid-year population estimates by the National Records for
Scotland identified Argyll and Bute as the 6th fastest growing local authority, with the
population growing by 0.9% from 2020-21, exceeding the ambitious LHS growth
target of 0.5%. This increase in population will further fuel housing demand in the
HMAs which have seen the greatest population growth. However, future housing
demand may be damped by the predicted recession in 2023; in such turbulent times,
the council will continue to monitor need and demand in HMAs and modify
investment priorities accordingly. 
Prioritisation by Tenure – The majority of the SHIP programme should be for social
rent; however, alternative affordable tenures such as shared equity, other low-cost
home ownership options or below-market rent will be considered on a site-by-site
basis in line with local market conditions and needs, and actively encouraged where
appropriate, subject to a robust business case being made. 
Prioritisation by Size – The HNDA and the HOMEArgyll common housing register
identify that the most significant demand is for one and two-bedroom properties;
hence, the SHIP will continue to promote the delivery of smaller properties. The
number of applicants waiting for a one or two-bedroom property rose by 10% from
2021. As of July 2022, 83% of the active waiting list applicants required 1- or 2-
bedroom accommodation, while 12% required three beds and 5% required four or
more bedded properties. The number of applicants wanting a four-plus bedroom
property fell from 15% in 2021 to only 5% in 2022. 
Although waiting list demand for larger properties has fallen, the HNDA process
identified demand for larger, family-sized accommodation. “Bright Start, Bright
Future” by the Scottish Government identified larger families as one of the vulnerable
family types which are more likely to experience child poverty. The council is
committed to addressing child poverty, and hence the SHIP partners will consider
economically viable options, to deliver larger homes where there is a specific need,
including private acquisitions and off-the-shelf properties. (See section 11). 
Prioritisation by Particular Needs – Specialist housing provision is often required
for:
 those who have impairments such as cognitive, physical, sensory
developmental or a combination of impairments. 
 older people with mobility or other health care needs
 those with mental health conditions. 
To provide suitable accommodation for those with disabilities/ impairment and the
ageing population, the LHS specifies a target of 10% of new build should be
purpose designed as specialist provision to suit households with medium to high-
level particular needs. 
Page 242

Page 243

As far as possible, all general needs new builds are designed to the minimum
lifetime, Housing for Varying Needs Standards, to maximise the accessibility for
residents whose circumstances and needs will change over time.
In addition, the extent and nature of the future ageing population, for instance, will
necessitate strategic investment in developing and delivering housing-based care,
support and aids, and adaptations. To this end, the council has developed a more
cohesive partnership with the Integrated Health & Social Care body to ensure that
the SHIP process is fully aligned with the health and social care integration agenda
and other relevant plans such as the “Keys to Life” strategy for persons with learning
disabilities, the Integrated Children’s Services Plan, the refreshed national housing
strategy for Older Persons published in August 2018, “Age, Home and Community:
the next phase”; and the Fairer Scotland for Disabled People strategy published by
the Scottish Government in 2016; among others. Further refinement of the
wheelchair housing targets in line with the Scottish Minister’s directive is set out in
Section 8 of this plan. 
The finer detail of the programme will be arrived at through specification of suitable
type and size of accommodation for individual developments, taking into account the
needs of actual households on the waiting list and, where appropriate and as far as
possible, in consultation with local community stakeholders. 
Prioritising projects which align with the council’s overarching vision to grow
the population 
The Argyll and Bute Rural Growth deal aims to facilitate the delivery of a range of
housing tenures to accommodate local workers and support business growth in the
initial pilot areas of Tobermory and Bowmore. The Islay and Mull SHIP projects will
complement the RGD housing proposals. 
Prioritising projects which improve town centres 
In addition, to supporting remote rural and island communities, the SHIP programme
also supports projects which improve town centres. Historically RSLs in previous
SHIPs have delivered new build affordable housing in:
 Albany Street- Oban (6 units completed in 2019), 
 St Cuthberts, Dunoon (17 units completed in 2017), 
 The Rothesay CourtHouse- Rothesay (25 units for Shared Equity – last property
sold in 2022).
This SHIP has the following town centre projects 
 Jeanie Deans Helensburgh
 Eton Avenue Dunoon
SHIP projects should provide Rural and Island Proofing2 – the Council’s
Housing Service will continue to apply a policy of rural-proofing housing plans and
strategies to ensure the more remote and isolated areas, or those designated as
“fragile”, are not disadvantaged or adversely affected by investment and                                                                 
2 Rurality is defined in the Scottish Government Urban Rural Classification, see: 
http://www.gov.scot/Topics/Statistics/About/Methodology/UrbanRuralClassification. In addition, one
definition of fragility is outlined in the report: Review of Fragile Areas and Employment Action Areas in
the Highlands and Islands, HIE, November 2014. 
Page 243

Page 244

development decisions. Critical to this aim is joint working with local planners to
support the development and sustainability of designated key rural settlements
across Argyll and Bute, as well as supporting the aims of the Loch Lomond &
Trossachs National Park. 
Key factors influencing the prioritisation of rural developments include: 
 the ratio of waiting list applicants to lets; 
 the ratio of social housing to second homes; 
 proportionate historic losses through Right to Buy; 
 the percentage of social housing to total dwelling stock; and 
 the ratio of local earnings to average or lower quartile house prices and
private rents. 
While existing, evidenced need remains the primary concern, consideration will also
be given to rural areas of potential economic development and/or population growth
in liaison with Economic Development colleagues and the local business sector. 
The rural/urban housing differential is acknowledged nationally in the structure of
the Scottish Government’s benchmark framework for grant funding, whereby Argyll
and Bute receives a rural uplift to address the additional costs involved in remote
rural and island development. The council previously commissioned dedicated
studies of island housing markets, specifically for Mull and Islay3, which provided
evidence of the disproportionate uplift development costs for these areas and
highlighted specific issues and barriers to development in these contexts. 
This SHIP has also been developed within the context of the Islands (Scotland) Act
2018, which introduced measures to support and help the unique needs of
Scotland’s islands now and in the future. The Act also seeks to help create the right
environment for sustainable growth and empowering communities. With around 23
inhabited islands in this local authority area (more than any other Scottish authority),
Argyll and Bute is committed to supporting and sustaining population and economic
growth in these communities and will always ensure to engage directly with the
islands when new policies and strategies are being developed that may impact on
them. The SHIP aims to support the priorities of the island communities, and our
consultation reflects this commitment. In addition to the aforesaid island studies, we
ensure that our overarching HNDA process allows for a significant, representative
sample of local households on individual islands to participate and register their
housing needs and voice their general views on local housing. A formal Islands
Impact Assessment has been developed as part of the LHS process, and this
document also covers the SHIP. See Section 14 for details. 
Consultation with Argyll and Bute’s island communities found that only 20% of Argyll
islanders believe there is sufficient affordable housing available locally, and only
22% agree that there is a variety of housing types, sizes and tenure to meet local
people’s needs. 92% of Argyll islanders believe there is insufficient housing to meet
local demand. In addition, high levels of fuel poverty are recorded on the islands,
and very high rates of ineffective stock (mainly second/holiday homes). The rapid
expansion of short-term-lets in recent years has also contributed to the high rates                                                                 
3 “Islay Strategic Housing Overview”, Community Housing Scotland (2019); “Isle of Mull Strategic Housing
Review”, Rural Housing Scotland (2019).
Page 244

Page 245

of ineffective stock. This is demonstrated by the council identifying 4000 properties
in 2022 in the entire council area that fall into the short-term lets definition4. The
number of ineffective properties may reduce with the introductions of the Scottish
Governments short-term-let regulations which requires properties being used in this
way to have a short term let license. The council is also contemplating if it will
establish short-term-let zones in areas with particular pressures. Properties used
for short term lets in identified zones will require Planning Permission in addition to
the short-term-let license. The council will continue to monitor the levels of
ineffective stock in tourist hotspots such as islands. 
To tackle the lack of sufficient affordable housing in island communities the SHIP in
the last 5 years (2017- 2022) has delivered 70 units on the islands, equating to 15%
of all units provided within Argyll and Bute. The islands received SHIP investment
of over £16.25 million to deliver these new homes. Of the 12 SHIP projects on-site
or completed during 2021/22, three (25%) were located on the islands, and four
(33%) were in rural locations out with larger towns. A further three projects (25%)
were located in the main towns of Helensburgh, Dunoon and Campbeltown, while
two projects (17%) were in Dunbeg. This reflects a suitably spread of new
developments across the local authority area. 
Future prioritisation process  
The implementation of National Planning Framework 4 (NPF4) requires councils to
support communities undertaking Local Place Plans. This will place greater
pressure on councils to address the needs identified by community plans. In the
future, the council will revise its prioritisation process to include a robust scoring
system to ensure transparency in the decision-making process.                                                                     
4 2820 of the identified Short-Term Lets are known through Council Tax and NDR 1180 additional properties
are estimates.
Page 245

Page 246

It is important to identify, assess and respond to any risks or potential constraints that
might impact the overall programme or individual projects; and that effective measures
are taken to mitigate these as far and as early as possible. The SHIP aims to assure
that, if funding is secured, any other constraints will be resolved by the time of the
estimated site start of the relevant project. The main risks or constraints that tend to
apply to the SHIP programme include: 
 Increased construction costs which are being impacted by supply chain issues,
unprecedented fuel costs and inflation.
 The constrained capacity of the local construction sector and tight labour
market.    
 Development and Infrastructure constraints.
 Effective land supply and legal procedural constraints.
 Planning issues. 
 Financial assumptions. 
Mitigating Constraints
The council and its partners are working continuously to minimise these risks and
mitigate constraints as far as possible 
a) Increased construction costs and a tight labour market 
The Helensburgh area benefits from wider competition from out with the local
authority boundaries however, this is not the case for the remainder of Argyll and
Bute which is more reliant on the local construction sector. The constrained
capacity of the local construction sector has a huge impact on delivering new
homes. Local contractors rely on tradespeople the central belt to fill in gaps in
provisions. Brexit and Covid 19 have reduced the number of people in the labour
market. Therefore, employees are able to be more selective in the jobs they
undertake. A shortage of labour combined with the exorbitant fuel costs have
placed additional hurdles in the way of recruiting construction workers who are
prepared to travel to Argyll and Bute to undertake construction work. 
The Scottish Government issued revised benchmark costs in October 2021 to
reflect the increased construction costs. However, the cost of labour and materials
appear to have increased more sharply in remote rural and island communities. In
addition, RSLs and contractors continue to highlight concerns in balancing cost
and quality considerations, especially given the ongoing cost of securing private
finance in a high-interest financial environment. These factors will make delivering
new homes within the revised benchmark extremely challenging.   
To mitigate against higher construction costs and shortages of labour the council
and its partner have explored innovative construction solutions. For example, in
Dunbeg, the main contractor MacLeod’s had the experience of developing floor
and roof panels and larger prefabricated wall panels in off-site factories. For
Dunbeg, MacLeod’s installed temporary factories to effectively allow off-site
4) DELIVERING THE PROGRAMME: MITIGATING RISKS AND
RESOLVING DEVELOPMENT CONTSRAINTS
Page 246

Page 247

manufacturing to take place close to the development site. This allowed for ‘just-
in-time production of floors, roofs and other key components speeding up the
project and ensuring greater quality control and consistency. Other benefits were
having buildings made wind and watertight extremely quickly, reducing waste, and
reducing costs by going to and from sites. 
In addition, the council part funded four modular homes built by the Wee House
Company in Ulva Ferry. Each house is made of between four and six modules,
depending on the size of the finished home, and 90% of construction was
completed under factory conditions, meaning site preparations could be completed
in tandem. It only took a matter of weeks from the modules being delivered to
residents moving into the properties. 
The council and its partners will continue exploring and utilising technological
solutions and modular construction methods if appropriate for the development. 
b) Rapidly changing economic landscape
The HNDA published in 2021 included a range of scenarios such as: 
 the worst-case scenario of severe demographic and economic decline in the
short term; 
 less severe and stabilising scenarios; 
 to more optimistic growth scenarios; 
While the years following lockdown have resulted in increased population and
higher house prices in Argyll and Bute the economic landscape is extremely
volatile and uncertain. High energy costs, high inflation and higher interest rates
could result in economic decline, and financial constraints leading to widespread
unemployment and hardship with resultant loss of homes or tenancies. In this
scenario, there would be a requirement for the safety net of affordable social
rented properties to increase. However, on the other hand, if the behavioural shift
in terms of more home-working and in-migration to remoter, rural and island
havens continues, then that would also entail a requirement for increased
affordable housing supply.   
What certain is the prioritisation framework underpinning the SHIP will need to
respond to these changes. 
c) Development Constraints (such as infrastructure issues: roads, utilities, ground
condition problems/ abnormal costs) - The core SHIP programme has always
Page 247

Page 248

aimed to focus on sites that are not subject to significant development constraints,
such as contaminated brownfield sites, designated greenbelt areas, or sites with
restricted infrastructure capacity in terms of access roads or water supply.
However, in certain instances within some highly pressured areas where a
substantial shortfall in affordable housing is evidenced or in areas of wider strategic
importance, it may be necessary to consider such sites in the absence of more
practicable or easily progressed sites. Apart from the site constraint, there may be
costs associated with carrying out remedial works, preliminary feasibility studies,
or mitigating the potential impact on areas of archaeological significance or historic
buildings, which further constrain on-site development. Mitigation may be aided by
ensuring site investigation is carried out at early stages and seeking to ensure land
values reflect any remediation costs. Regarding infrastructure constraints, such as
Scottish Water connections/ capacity/ access, early discussions with the Utility
companies will be initiated to address potential issues and achieve possible
synergies in investment programmes. Where possible, abnormal costs should be
deducted from the land purchase price, and unforeseen costs may be met from
alternative sources such as the council’s Strategic Housing Fund, developer
contributions, or other funding sources. 
The Housing Infrastructure Fund (HIF), in particular, has already proven to be a
significant factor in supporting housing development in this authority through grants
for sites which are of strategic importance and cannot proceed or have stalled due
to exceptional infrastructure works (out with the curtilage of the development); and
can help facilitate the unlocking of these sites for the delivery of housing. The
council successfully prioritised the further development of Dunbeg, for instance, as
a key site for delivery of housing utilising this fund and was awarded £2.1m in total,
in line with the eligibility criteria and guidance set out by the Scottish Government. 
d) Effective Land Supply - The RSL land bank and available council-owned sites
have now been depleted, and it may be that in the future land assembly will prove
a significant challenge. A notable feature of a rural and island authority such as
Argyll and Bute is the dominance of large estates in terms of land ownership in
many areas exhibiting housing need. This can present additional challenges in
respect of accessing and assembling suitable sites for development. Nevertheless,
through collaborative efforts with planning colleagues, the council and National
Park are confident that a “generous” supply of land for affordable housing
continues to be sustained, as seen in the table below. 
Page 248

Page 249

TABLE 1: Land Supply within the Local Authority by Housing Administrative Area 2021-2026 
Source: Housing Land Audit 2022. 
Occasionally, proposed projects are subject to complex or protracted negotiations
with private owners and their agents, which can impact on the timing and ultimately
on their deliverability. Therefore, effective liaison with the Scottish Government to
prioritise projects and progress site acquisitions to enable projects to be pulled
forward if required is essential. 
In addition, the impact of both the Council and National Park Affordable Housing
Policies continues to prove valuable; there is an obvious need to sustain practical
negotiations with landowners, Estates, private developers and others. Some RSL
partners have, however, raised concerns that in the current climate, the application
of the Council’s Affordable Housing Policy will make site development less
attractive, and sites are only likely to be developed where there is pressure to
secure a return in the short term. In the medium to long term, the private ownership
of many sites in Argyll and Bute means that the Affordable Housing Policy will
continue to have a definite role in securing a sufficient supply of affordable housing
through developer contributions. Strategic engagement with local communities and
agencies such as Highlands & Islands Enterprise to assess the potential use of
Strategic Land Fund, where appropriate. 
Partners continue to carefully consider the timing and possible phasing of
developments to make realistic assumptions on when affordable housing will
proceed. We aim to ensure that a sufficient supply of sites has been identified to
accommodate unforeseen project slippage and to ensure the spending of allocated
funding. 
In situations where projects cannot be taken forward due to land supply issues, the
council will consider a Compulsory Purchase Order (CPO) approach where there
are compelling benefits to the public interest.
Page 249

Page 250

e) Planning issues - Early discussions will continue to be prioritised with planning
services (both Council & National Park) regarding road layouts/ car parking
requirements, flood risk assessments, school catchment areas, and other possible
issues. The provision of adequate footpaths adjacent to new developments, for
instance, has been a particularly prominent issue in a number of recent SHIP
projects. All of the development sites included in the SHIP programme should be
effective given that they will, in most cases, require to be already allocated for
housing development in the relevant local development plans. Many of the sites
identified in the SHIP are of relatively small capacity. The costs associated with
progressing smaller sites in the more remote rural areas are likely to be higher if
developed as standalone projects. However, it is envisaged that where SHIP sites
form part of a larger allocation identified in the LDP/ LDP2, through partnership
working with private developers on adjacent sites, the risk of such sites not being
developed on cost grounds will be reduced. 
RSLs in Argyll and Bute have recently made significant progress in delivering
alternative tenures such as shared equity units. The future provision for tenures
other than social rent will require detailed business plans and must reflect a robust
and credible assessment of local needs before approval. The council intends to
evaluate the impact of these projects to inform the future programme. The council
is keen to encourage and support alternative, intermediate tenures when
appropriate, to enhance the housing mix and to increase the range of potential
housing options. 
The three primary funding sources for the SHIP remain as follows: 
a) Scottish Government Grant (the Affordable Housing Supply Programme –
AHSP)
b) Council grant or long-term loan (the Argyll & Bute Strategic Housing Fund – SHF;
which may be supplemented from Council central reserves)
c) Registered Social Landlord (RSL) Private Finance Borrowing     
The majority of developments will require a complex package of funding from at least
all of these sources (additional investment from other sources may also be required –
some of these are outlined below). 
a) Scottish Government Resource Planning Assumptions (RPAs)
In July 2021, the Scottish Government confirmed local authorities’ RPAs up to 2025/26
however the current SHIP runs until 2027/28. The Scottish Government have not yet
agreed the RPA for years four (2026/27) and five (2027/28) of the SHIP programme. To
address this the council has agreed to an assumed RPA for these later years however it
is important to note that the figures for 2026/27 and 2027/2028 are not a formal definitive
allocation. 
5) RESOURCING THE PROGRAMME & THE COUNCIL’S
CONTRIBUTION 
Page 250

Page 251

TABLE 2:  RESOURCE PLANNING ASSUMPTIONS (RPA) 2023- 2028 (£m)
Argyll & Bute 2023/24 2024/25 2025/26 2026/27 2027/28     Total
Minimum RPA £18.264 £18.328 £18.632 £18.632*5 18.632*5 £92.488                 
Source: Scottish Government Letter to Councils – AHSP RPA 2021-26,
July 2021 
The actual AHSP spend in 2021/22 was lower than the original RPA for that year, due in
part to the impact of Covid 19 on the delivery of the programme and the difficulties of
obtaining labour and materials, however spend for the previous year exceeded the
nominal RPA, and over a five year planning period we would expect spend to balance
out. The council will continue encouraging RSLs/developers to maximise funding
opportunities and utilise the available RPA as much as possible. This might include
increasing off-the-shelf / buy-back acquisitions, land banking in areas of identified need
or designated future economic growth spots. 
b) The Council’s Contribution – The Strategic Housing Fund (SHF) 
Resourcing the SHIP programme also requires a significant contribution from the
council’s Strategic Housing Fund (SHF). This fund is primarily based on the revenue
raised from reduced tax discounts on empty and second homes. Where local authorities
have used discretionary powers and reduced the empty and second homes tax
discounts, the additional revenue must be used to support affordable housing delivery
in their areas. In addition, since 2013, local authorities have had the flexibility to remove
the discount and apply a levy of up to 100% on long-term empty properties. These
revenues are not ring-fenced, although their use to bring long-term empty properties
back into use, or to support affordable housing provision, is encouraged by the Scottish
Government. 
Since 2007, the SHF in Argyll and Bute has been used for the following eligible
expenditure:
 Expenditure incurred in relation to assets formally held on the Housing Revenue
Account;
 Expenditure relating to the acquisition of sites for the landbank;
 Expenditure related to the delivery of the Empty Homes Initiative;
 Payments to enhance infrastructure where this is restricting the development of
affordable housing;
 Payments to registered social landlords (RSLs) to partially fund proposed projects
to deliver homes in accordance with the local housing strategy. Since April 2016,
the council has provided grant funding of £12k per unit to supplement the Scottish
Government grant;
 Following the council’s annual policy review of the Strategic Housing Fund in
2018, a potential grant payment of £12k per unit and in some cases more than
this is able to be awarded to community bodies, which have been awarded
Scottish Government support from the Rural or Island Housing funds, to deliver
affordable homes. Awards greater than £12K may be awarded in certain
instances to ensure the deliverability of projects with particular challenges
however this will be decided on a case by case basis 
5 * These figures are based on previous years’ allocation, and they are not formal definitive allocations. 
Page 251

Page 252

In 2021/22 the income generated for the Strategic Housing Fund amounted to £2.143m
and total expenditure that year was £2.672m on the following projects: 
£48,000  – Kirk Rd, Dunbeg
£1,827,197  – Dunbeg Phase 3
£120,000  – Craighouse, Isle of Jura
£72,000  – North West Mull Community Woodland Co 
The balance of this fund as of 31st March 2022 was £9.470m, of which £1.173m was
already committed, and £8.297m was available to fund the SHIP programme.
It is anticipated that the SHF will continue to accrue annual revenue in the order of £2m
over the SHIP planning period. 
TABLE 3: Argyll & Bute Council Strategic Housing Fund, balance as of March 2022
Income
2021/22
Expenditure
2021/22
Balance   March
2022
Committed
Spend
Available to
support SHIP
£2.142m £2.672m £9.470m £1.173m £8.297m 
An indicative minimum estimate of circa £12.4 m would be required to support the core
projects outlined in this SHIP (£12k x 1036 units), 
In addition, the council has also used its financial reserves on occasion to advance
long-term loans to support RSL projects, and this commitment is subject to ongoing
review. 
The council reviewed the Strategic Housing Fund policy in 2018/19. A further
comprehensive audit was carried out in 2019/20 to ensure that this resource continues
to complement Scottish Government priorities for Housing Beyond 2021. 
The findings from the internal audit reported in 2021and are as follows:
 the SHF is being spent appropriately in compliance with legislation and national
guidance and is having a positive impact on the delivery of housing across Argyll
and Bute. 
 the council is achieving value for money from the SHF with a strong partnership
working in a place with RSLs and the Scottish Government. 
 there is benefit in extending the SHF to community groups; however, this requires
proper due diligence to safeguard against the enhanced risk of projects not being
delivered. 
The above demonstrates that the appraisal of the process and policies underpinning the
SHF was positive. 
c) RSL’s Private Finance Borrowing
Banks and other lenders in the private sector also remain vitally important partners in
the delivery of affordable housing. RSLs are required to demonstrate that sufficient
borrowing capacity or reserves exist to ensure the delivery of the proposed
development programme. Following a period of restrictive lending, with greater
scrutiny of projects, higher lending rates and the requirement for additional security
from existing stock, which often resulted in RSLs being forced to use their own
reserves rather than borrow under such conditions; last year RSLs were reporting
positive improvements in their potential to access private finance, and at a national
Page 252

Page 253

level the sector continues to explore innovative funding models. The impact of rising
interest rates on RSLs’ ability to borrow will have to be kept under review. 
Figure 1 depicts SHIP investment for completed projects. It is important to note that
Dunbeg is not included in the figures as the project is not completed; however, 115
units were completed as of 31st March 2022. Proportionately this would equate to £24
million of investment. 
Private finance was used to support the following completed SHIP projects in 2021/22:
 Kirk Road Dunbeg £80,681
 Cairndow £364,500
 Garelochhead £649,714
 Imereval Phase 3 £270,000
Private finance equated to £1.36 million or 31% of the total investment for these
projects. 
The revenue from the New Supply Shared Equity (NSSE) schemes provided additional
investment to support the SHIP programme. Total investment from all sources for all
SHIP projects completed in 2021/22 amounted to £4.338m. An additional £24 million
of investment was allocated to Dunbeg equating to £28.338 million of investment in
2021/22 
FIGURE 1: Completed SHIP projects 2021/22 by funding source                                           
Source: Council/RSL Records 2021/22
Housing Infrastructure Fund (HIF)
The Housing Infrastructure Fund supports housing development through grants and
loans, with priority given to sites of strategic importance that cannot proceed or have
stalled due to infrastructure requirements. Grant is available to local authorities and
RSLs for works which are out with the curtilage of the affordable housing site and/or
of scale and will open up larger sites for housing development. Loans are available for
viable non-public sector-led sites to support infrastructure delivery. 
The council’s main priority for HIF funding is the Dunbeg development in the Lorn
HMA. As reported in previous SHIPs, the Scottish Government awarded a Housing
Infrastructure Fund grant amounting to £2,129,247 for upgrade works to Kirk Road to
enable the development of 300 new affordable homes to commence. This remains a
significant priority for the council, Link and West Highland Housing Association are
working in partnership to deliver the project. While the infrastructure issues have
been addressed, the impact of Covid-19 in 2020/21 and 2021/22 meant that the
£2,468,000
£336,000
£1,360,000
£174,000
Scottish Government AHSP Council SHF RSL/Developer Other
Page 253

Page 254

completion of all 300 units has been delayed and consequently, the final units may
not be fully delivered until 2023.                         
While the Scottish Government has confirmed that the HIF will be extended post-
2021, there is no guarantee that Argyll and Bute will receive further awards from this
source; nevertheless, the council and RSL partners will continue to propose potential
projects within the SHIP that could benefit from HIF investment. In August 2022, we
will have 3 HIF projects in Argyll at an estimated cost of £ 5 million. These could
include the following: - 
TABLE 4: SHIP Projects with potential HIF requirements, as of August 2022
Project RSL Total Units Estimated HIF Requirement
Glencruitten, Oban LINK 100 (tbc) £0.72m
Hospital Field, Oban LINK 50 £2.0m
Dunbeg Phases 4-6 LINK 150 £2.5m 
Rural and Islands Housing Funds (R&IHF)
The Scottish Government established a £25 million Rural Housing Fund and a £5
million Islands Housing Fund, which ran to 2021. Both funds aimed to increase the
supply of affordable housing of all tenures in rural Scotland and contribute to the
national affordable homes targets. 
In 2020, Mull & Iona Community Trust was awarded £777,855 from the Rural
Housing Fund. The project was completed in 2021 and provided four new homes in
Ulva Ferry on Mull. 
In 2021 three communities in Argyll and Bute received funding from the Rural/
Islands Housing Fund. 
 North West Mull Community Woodland gained approval for six homes on the
Isle of Ulva
 The Glengorm Farming Partnership obtained approval for five homes in
Tobermory
 The Colonsay Community Development Company secured funding to provide
six homes in Scalasaig on the Isle of Colonsay. 
The Scottish Land Fund 
The Scottish Land Fund (SLF) provided support to housing projects in:
 Colonsay Community Development Company, with a grant award of £390k to
meet site acquisition costs for a mixed-tenure affordable housing project on the
island. Additional funding contributions have been secured from the Council’s
Strategic Housing Fund and Highlands & Islands Enterprise.
 Ulva community-acquired ownership of the island with an award of £2m, and
the community obtained approval in 2021 from the Islands Housing Fund to
finance six homes on Ulva.
 Pennyghael, which entailed carrying out extensive renovations to an existing
property. The council also contributed financially to this project which was
completed in 2021. 
Page 254

Page 255

Rural Growth Deal 
The RGD equates to £50m of investment. Two projects are being taken forward, one
in Bowmore on Islay and one in Tobermory on the Isle of Mull. These projects will
provide housing for key workers. 
Developer Contributions
Argyll and Bute falls within the purview of two planning authorities: while the council
covers most of the mainland and islands, Loch Lomond & Trossachs National Park is
the planning authority for parts of Cowal and Lomond. Both authorities have set out
formal Affordable Housing Policies in their respective Local Development Plans.
These policies outline mechanisms and options to secure developer contributions
where there is a demonstrated need for affordable housing.   
The council’s current policy was adopted in supplementary guidance to the LDP in
March 2016. It required that out with specified housing allocations and Potential
Development Areas (PDAs), new private developments proposing eight or more
homes should deliver a minimum of 25% affordable housing units. Given the revised
and reinforced strategic vision of growth and repopulation for the whole of Argyll and
Bute, it is likely that the affordable housing policy will be applied presumptively across
all HMAs. 
Developer contributions can be delivered by a variety of means, including social rented
housing, mid-market rented housing, payment of commuted sums and also the
building of houses/apartments designed to meet the needs of first-time buyers
(provided these are available at affordable levels as defined by the council’s HNDA
and with reference to the relevant local housing market).   
The sequential mechanisms for securing Affordable Housing via the policy are applied
in the following order: 
 on-site provision; 
 off-site provision; 
 commuted payment; 
 discounted low-cost sale; 
 affordability by design without subsidy.
To date, no commuted sums have been received, and the preferred approach has
been to engage with an RSL to deliver the affordable quota on site. 
The National Park policy follows a similar approach, with a requirement for 25%, 33%
or 50% affordable provision on sites of 4 or more units depending on the location. Sites
of up to 3 units in accessible rural areas may also have a policy requirement under
certain circumstances. A formal policy for calculating commuted sums has been
established but again, little or no payments have been received. 
The delivery of unsubsidised affordable housing for purchase via the Affordable
Housing Policy, but without Scottish Government funding, will normally target a
different client group and requires close working between Housing Services and
Planning colleagues to ensure these models are in fact affordable in accordance with
the LHS and SHIP priorities. 
Page 255

Page 256

Other Initiatives
The council will also continue to explore and, where appropriate, promote non-AHSP
financing models such as Build-to-Rent, Low-cost Initiative for First Time Buyers
(LIFT), and Open Market Shared Equity (OMSE), which may fall out with the remit of
the SHIP. 
Supporting empty homeowners to take action to bring properties back into use remains
a priority for the council as this will help to maximise the use of existing resources to
meet housing need; contribute to number of the council’s wider strategic objectives;
and provide cross-service benefits both within the council and with external partners.
The council funds an Empty Homes Officer post and the officer can support owners
with a range of practical options to assist them make informed choices about the best
outcome for them and their property. 
During 2021/22 the Empty Homes Officers assisted in bringing 38 empty homes back
into use which was 27% above target. Over the last 5 years, the council’s approach
has enabled owners to bring a total of 217 vacant properties back into use against a
baseline target of 125. 
The length of time that properties had remained empty prior to being brought back into
use varies, the average is between 2-5 years, with the longest empty from 2003. 
TABLE 5: Length of time a property had been empty before being brought back into use in
2021/22
Duration as Empty No of Empty Homes
less than a year 7
between 1-2 years 8
between 2-5 years 14
between 5-10 years 8
longer than 10 years 1
Total 38 
Over the last five years, according to the Council Tax Register,  the number of long-
term empty properties has increased by 5% while the number of second/holiday
homes declined by almost 10%, and the total dwelling stock increased overall by 2.6%. 
6) Empty Homes 
Page 256

Page 257

TABLE 6: Estimated Ineffective Stock Argyll and Bute 2017-2022 
Council Tax Register  2018 2019 2020 2021 2022 % change 2018-
2022
All properties 48,014 48,906 48,285 48,166 48,570 1%
2nd /holiday homes 2,998 2,939 2,881 2,689 2,821 -6%
Long-term empty 1,218 1,479 1,363 1,230 1,135 -7%
No of long term empty
subject to double charge
(200% levy)
762 586 644 644 640 -16%
Long-term empty homes
as % of total
2.54% 3.02% 2.82% 2.55% 2.33% 
Empty + 2nd /holiday
homes as % of total 
8.78% 9.03% 8.79% 8.14% 8.14% 
Source: Council Tax Register 
Compulsory Purchase Orders (CPOs)
The use of Compulsory Purchase Orders legislative powers allow councils to acquire
empty homes under certain circumstances and subject to specific conditions. The
Scottish Government refreshed the guidance in 2018, which has refined the legal
process and made it less complex and time-consuming for local authorities to submit
an application to Ministers for consideration. Whilst the CPO has historically been
considered a last resort and has not been standard practice, it is the council’s view
that these powers do have a strategic role to play and could be used more effectively
where there are no other practical solutions to address the issues of the most
problematic buildings in the area. This has been reinforced by feedback to the LHS
early engagement consultation: when local residents and community groups were
asked to rank the top housing challenges currently facing Argyll & Bute, 38% of
respondents highlighted the impact of empty properties and second/holiday homes,
making it the third highest issue among the local population. CPO powers were
successfully utilised in 2019, to acquire an empty property that had no legal owner.
The council then facilitated back-to-back sale to enable the property to be brought
back into use. Without legal intervention the property would have remained empty
indefinitely having a detrimental and financial impact on the other owners in the
tenement. A CPO policy and process will be incorporated into our empty homes policy
as an action for this LHS, targeting resources to the most difficult cases where there
are no alternative options to bring them back into use. 
In line with the Child Poverty (Scotland) Act 2017, the council, together with the
Health Board, produces on an annual basis the Argyll & Bute Local Child Poverty
Action Report (LCPAR). This report sets out progress against the four statutory,
income-based targets, to be achieved by 2030. These targets are:
 Less than 10% of children are in relative poverty 
 Less than 5% of children are in absolute poverty 
 Less than 5% of children are in combined low income and material deprivation 
 Less than 5% of children are in persistent poverty 
7) CHILD POVERTY AND FUEL POVERTY  
Page 257

Page 258

The Scottish Government’s Delivery Plan for tackling child poverty ‘Bright Start, Bright
Futures’ places the tackling of child poverty at the heart of the Affordable Housing
Supply Programme. Bright Start Bright Futures states: “Housing has a vital role to play
in tackling child poverty; it forms not only the foundation for family life – as a safe place
for children to grow and learn, and for families to come together – but it also one of the
most significant costs which families must continue to meet on an ongoing basis. If
families lose their home, the effects can be devastating – and cause lasting damage to
children’s lives.” In the future the SHIP and LHS monitoring arrangements will more
robustly collate and analyse data on outputs in relation to impacts for children and
families 
Research suggests that living in temporary or insecure housing negatively impacts
children’s development and education, locking them into a cycle of poverty.
Therefore it is vitally important to provide homeless families with children permanent
accommodation. The council and its partners have substantially reduced the number
of homeless families with children in temporary housing. Table 7 shows that both the
number of households and the numbers of children in temporary accommodation fell
last year, and both measures are substantially lower last year than in 2018. 
Page 258

Page 259

TABLE 7: Number of homeless households and the number of children in
temporary accommodation
HOMELESS STATISTICS
21/22 2018 2019 2020 2021 2022
Change 
2021 to
2022 
Number
Change 
2021 to
2022 
%
Households with children or a
pregnant woman in temporary 
accommodation  35 30 25 30 25 -5 -17%
Number of children
in temporary accommodation  85 65 55 60 45 -15 -25%
Source: “Homelessness in Scotland: 2021-22” August 2022 
Although the numbers of homeless children or children threatened with
homelessness within Argyll and Bute increased slightly between 2020/21 to 2021/22,
the general trend has reduced from 267 children in 2017/18 to 166 in 2021/22.
However, the Cost of Living Crisis could reverse this trend as wages are not keeping
track with inflation resulting in families paying exorbitant amounts for food and
energy. This, coupled with higher interest rates, will mean, for some, higher
mortgage payments or private landlords passing on increased mortgage costs to
their tenants. The consequences of energy, food, accommodation as well as many
other products all costing substantially more will mean many families will be unable
to finance the necessities and for some this may result in them becoming homeless.
Therefore, having an adequate supply of affordable housing is more important than
ever.   
TABLE 8: Number of children associated with applications assessed as homeless or 
threatened with homelessness
Local
Authority
2017-
18
2018-
19
2019-
20
2020-
21
2021-
22
Change Change    
20-21 to
21-22
20-21 to
21-22    
Number %    
Argyll & Bute 267 164 153 161 166 5 3%    
Source: “Homelessness in Scotland: 2021-22” August 2022 
In 2021/22, the HOMEArgyll RSLs rehoused 289 households who had at least one
household member under16 years of age. This equated to 467 children housed in
2021/22 which was 39% of the total lets that year. Although housing 467 children last
year was a considerable achievement, as of August 2022, there were 945 applicants
around a third (30%) of the waiting list, with a household members under 16 waiting
to be housed. This equates to 1,807 children currently on the housing waiting list.
Some of these households (121) have been awarded the maximum 200 points and
are deemed to be in extreme housing need and hence will be a priority for rehousing.
However, not all families with children will receive priority assistance for rehousing,
with 201 applicants with children not being awarded any housing points under the
allocations policy. 
The Child Rights and Wellbeing Impact Assessment (see section 14) undertaken as
part of the LHS process highlighted the negative impact on educational attainment of
Page 259

Page 260

children living in overcrowded accommodation. As of August 2022, 459 households
with children under 16  years of age are overcrowded. Bright Starts Bright Futures
identified families with more than three children are one of the six family types at
greatest risk of poverty. There were 139 applicants with children equating to 14.7%
of HomeArgyll waiting list who required a larger family home (4 or more bedrooms).
The SHIP housing planning process will place additional focus on housing those with
a need for a particular size of property in a specific location. This approach will
ensure that larger family homes are delivered where they are required. This may
including RSLs purchasing appropriate ‘off the shelf’ properties’ (see section 11). 
TABLE 9: Minimum number of bedrooms required by families on the
HomeArgyll waiting list 2022
HOMEARGYLL WAITING
LIST AUG. 2022
1
bed*6  2
beds 3beds
4
beds
5 +
beds TOTAL
Number of Applicants                                   
(with members under 16) 2 477 327 99 40 945
as % of total 0.2% 50.5% 34.6% 10.5% 4.2% 100.0%
Source: HomeArgyll waiting list August 2022. 
There is a need for the SHIP programme to prioritise delivering family housing as the
average time for families with children to be housed is 92 weeks (compared to 100
weeks for households without children). 
In most families housing and energy costs are the largest financial outgoing. The SHIP
not only provides access to affordable homes for families living on low incomes but it
also provides energy efficient homes. In the current economic climate, energy costs
are unprecedentedly high, making it more important than ever to reduce the amount
of energy needed to keep a home warm. Therefore, the council will ensure that 100%
of the SHIP programme will meet the green standards. 
Promoting energy efficiency and tackling fuel poverty remain strategic priorities for
the LHS and key commitments for the council; and maximising opportunities for
sustainability in development remains a key principle underpinning the SHIP. As with
all public bodies, this council is also required to meet its statutory duties arising from
the Climate Change (Scotland) Act 2009, and the LHS and SHIP have been
developed to ensure that the provision of new affordable housing complies with the
Act; and that all housing activities and outputs should contribute to the overarching
net zero targets and principles. One example of a project which embraced the net
zero ambitions was the Passivhaus scheme completed in 2021/22 in Garelochhead. 
6 * These figures are based on minimum bedroom sizes required.
Page 260

Page 261

The SHIP aims to address the housing needs of all the communities we serve and
continues to reflect a positive approach to equalities issues in line with the policies of
the council and its partners, and the principles of diversity and inclusion in accordance
with the Equality Act 2010. The HNDA (2021) provides robust evidence of
accommodation and support needs across the range of protected equalities
characteristics, and these have been translated into the SHIP priorities. The joint Argyll
and Bute Health, Care & Housing Needs Assessment, completed in 2018, provided
supporting evidence of the requirements for wheelchair accommodation, supported
housing, and other forms of specialist provision. In 2019/20, the council undertook
further specific studies on the need and demand for specialist provision for wheelchair
users, gypsy/travellers, military personnel and veterans, and persons who are autistic
or have learning disabilities. The findings have informed the 2021 HNDA and the
revised LHS which was published in 2022. 
An equalities impact assessment (eqseia) was undertaken during the development of
the LHS, and this will inform the SHIP. 
All SHIP projects, seeking public subsidy from the Council or Scottish Government,
are required to meet basic design and building standards (of the Housing for Varying
Needs Standard as a minimum) and should incorporate adequate provision to meet
any additional identified particular needs. Prioritisation of projects will give due weight
to those which incorporate elements of design or additional specifications for specialist
forms of housing where the local profile of need and demand indicates such a
requirement. The committed and planned programme include provision for elderly and
disabled residents and through the close partnership working with Health & Social
Work, including Occupational Therapists, the SHIP will continue to ensure the strategic
aims of the LHS in this respect are carried forward. 
In particular, the post of dedicated Housing OT which was established in October 2018
to co-ordinate and promote these needs through the SHIP group, was made
permanent in 2021, funded in full by the council Housing Services but working very
closely with RSLs and the HSCP. In practice, this commitment to equalities principles
will ensure: 
 building all new affordable housing to HfVN Standards;
 implementing design solutions which help to meet the needs of disabled and
infirm households;
 assessing and seeking to resolve the needs and aspirations of households with
community care needs in partnership;
 developing communities with a good mix of households;
 allocating housing via HOME Argyll and national RSL partners who have strong
commitments to equal opportunities; and
 providing affordable housing in rural areas which enables young and old people
to remain within their communities. 
Housing for Varying Needs (HfVNs) is a Design Guide published in two volumes (Parts
1 and 2). While not mandatory, the standards outlined in the guide have been used as
the basis for standards for housing developments seeking grant funding support. The
standards are intended to ensure that the housing is accessible, adaptable for different
8) SPECIALIST PROVISION INCLUDING WHEELCHAIR HABITABLE
HOUSING
Page 261

Page 262

needs and over its lifetime represents good value for money. They are based on the
principle that the design of a property should not hinder a person’s ability to live as
independently as possible and should recognise the needs of people as they age,
become less able or whose mobility, dexterity, cognitive function, hearing or sight is
impaired.   
The idea of designing all housing to accommodate the needs of less able people is
known as “barrier free” design and this is reflected in the core guidance of the design
guide; but the guide also recognises that barrier free design in itself is not a substitute
for homes designed specifically for people with particular needs so it identifies
additional features that should be included to address these needs. 
Analysis of the HOMEArgyll Common Housing Register in 2022 suggests that around
4% of applicants could benefit from some form of specialist provision. Three percent
(93) applicants requested wheelchair accessible accommodation; although 55 of
these applicants also select some other form of accommodation, including general
needs/ mainstream housing. Only 38 applicants only selected wheelchair housing. 
Applicants requesting wheelchair provision required homes with the following number
of bedrooms:
 48 (52%) of wheelchair applicants required a 1 bedrooms
 26 (28%) of wheelchair applicants required 2 bedrooms 
 11 (12%) of wheelchair applicants required 3 bedrooms 
 8 (9%) of wheelchair applicants required 4+ bedrooms 
The Health, Care & Housing Needs Assessment (2018) identified the following key
points:- 
Correlating the data sources may suggest that a majority of wheelchair users are
satisfactorily housed or do not aspire to social rented properties. However, some
wheelchair users who could benefit from suitable, specialist provision in the social
rented sector may not apply due to lack of awareness or misperceptions regarding the
suitability and availability of stock. This was identified as a key area for further research
and analysis, and in 2019/20 an in-house study completed jointly by the council’s
strategy team and the Housing OT.   A key finding of this study, collated with national
research, is that wheelchair users and those who might benefit from wheelchair
accommodation are not a homogenous group. Hence, a variety of housing solutions
are required.                                                                                       
Solutions such as aids and adaptations or support services will have a crucial role to
play, nevertheless, the SHIP will continue to require a target of 10% of the new build
programme to provide some form of specialist provision (to include retirement
 Around 350 wheelchairs are issued each year to people in Argyll & Bute
 The majority of wheelchairs issued are manual chairs
 Over 1,300 people in Argyll and Bute have wheelchairs on issue
 55% of people with wheelchairs are aged 75+
 Up to 280 people a year may be new wheelchair users
 There could be 240 additional people needing wheelchairs by 2027
 The most common reason for a wheelchair is cerebrovascular disease (stroke) but the
main reasons for wheelchair vary by age with Cerebral palsy being the most common
reason in people under 25.
Page 262

Page 263

housing, amenity housing, and other specially adapted properties); and within that,
half (i.e. 5% of the total new builds) should be built to the fully wheelchair habitable
standard as defined in the relevant Section of the current HfVN standards guidance.
In 2021/22 there were a total of 22 affordable homes designed for particular needs
delivered within the SHIP programme, amounting to 15% of the year’s total, which
exceeds the annual target of 10% overall (5% wheelchair and 5% other models of
specialist provision, excluding adaptations to existing stock). The new build units
included 13 wheelchair accessible homes (9% of total) and 9 amenity/older person
units (6%). This is an enormous achievement and a vast improvement on provision
in the previous two years where 8 units were delivered (7 in one year and 1 in the
following year). 
As far as possible, the wheelchair housing targets will also be encouraged within the
private sector, across all tenures, on all developments where this would be
appropriate. The SHIP Officers Group and the Strategic Housing Forum approved
this policy with immediate effect in 2020. RSL partners also continue to explore with
the HSCP requirements for extra care provision and possible new housing models
for people being housed in the community which is in accordance with the HSCP
aspiration to enable those with additional needs to live as independently as possible.
The council will strive to incorporate housing models which promote independent
living within the SHIP programme as it rolls forward. 
Argyll and Bute Council continues to support the Scottish Government’s 
commitment to improve the lives of our Gypsy/Traveller communities; and to
prioritise joint working with ACHA (who own and manage the two official, operational,
Travelling Person sites in Argyll and Bute) and other stakeholders to drive forward
positive improvements for this client group. 
The council continues to allocate ACHA an annual grant from the Strategic Housing
Fund as a contribution towards the operation and maintenance of the two remaining
Travelling Persons Sites at Bayview near Oban, and Duncholgan near Lochgilphead.
A Minute of Agreement set up at the point of stock transfer in 2006 set the sum at
£30k plus annual indexation. In 2018, the sum payable was reduced to reflect the
withdrawal of the Torlochan site near Dunoon, which was deemed to be surplus to
requirements due to the lack of demand. Recent council investment in the official
sites is summarised below: 
TABLE 10: ACHA Gypsy/Traveller Sites – Annual Council Funding  
Year 2017/18 2018/19 2019/20 2020/21 2021/2022 5 year Total
Grant £41,228 £31,001 £28,939 £29,338 £31,639 £162,145 
As part of the comprehensive refresh of the Housing Need and Demand Assessment
for Argyll and Bute, the council carried out a dedicated study to assess the
accommodation and support needs of Gypsy/ Travellers in the area. This included
an assessment of any “bricks and mortar” mainstream accommodation that may be
required. The study has involved extensive primary engagement with
9) GYPSY/TRAVELLER SITES
Page 263

Page 264

Gypsy/Travellers and their representatives; and this work has informed the
development of the latest LHS for Argyll and Bute. 
ACHA secured £108k from the Scottish Government’s Capital Fund for Improving
Gypsy/Traveller Sites. This was invested during 2021/22 to make interim
improvements to both official sites at Bayview (near Oban) and Duncholgan (near
Lochgilphead). ACHA are hoping to secure further funding to improve
Gypsy/Traveller sites. 
Scottish Ministers have made an ongoing commitment to end homelessness in
Scotland and consequently set up a national Homelessness and Rough Sleeping
Action Group (HARSAG) to bring forward recommendations to address this. A key
proposal was that each local authority should develop a Rapid Rehousing Transition
Plan (RRTP) by December 2018, covering a 5-year period, or longer if required, to
enable the implementation of this new approach. The RRTP maximises prevention
and sets out the council’s approach to minimise the time a household remains
homeless and to ensure that they can access appropriate suitable accommodation
as soon as possible. 
Local Rapid Rehousing Transition Plans should be reflected in the LHS and also be
fully integrated into Health & Social Care Partnership strategic plans. The Argyll and
Bute RRTP has consequently been included in the current Housing Contribution
Statement to ensure it forms part of the planning framework. This SHIP’s strategic
housing priorities are aligned and consistent with the proposed RRTP priorities and
outcomes. A crucial objective is to facilitate and deliver more affordable housing via
the SHIP.
In the report “Scotland’s transition to rapid rehousing”, produced by the Indigo Group
on behalf of the Scottish Government’s HARSAG in June 2018, two specific
recommendations were made in relation to the SHIP: 
 Rapid Rehousing Transition Plans could be seen as an integral part of the
SHIPs, and should be annually reviewed as part of the SHIP process 
 The Scottish Government and Scottish Housing Regulator should improve
data collection from local authorities or housing associations on completions
and lettings relative to housing need. 
With this in mind, Argyll and Bute Council continues to liaise with RSL partners and
other key stakeholders to develop and implement the RRTP; and will aim to ensure
that homelessness remains a critical factor in the SHIP process. This includes
homelessness as one criterion for assessing need, prioritising projects, and
awarding grants from the Strategic Housing Fund. SHIP projects are expected to
contribute directly or indirectly to alleviating homelessness across Argyll and Bute
(for example, as a result of direct allocations or via consequential lets to existing
properties freed up on transfer of occupants to new build properties). The
performance of developing landlords in respect of the proportion of allocations to
homeless households and time taken to rehouse these clients will continue to be
10) HOMELESSNESS/ RAPID REHOUSING TRANSITION PLANS 
& RAPID REHOUSING TRANSITION PLANS 
Page 264

Page 265

material considerations in SHIP programming decisions and resource allocation
moving forward. 
During 2021/22 Rapid Rehousing Funding of £241,496 was utilised to progress the
transition of Rapid Rehousing and Housing First in Argyll and Bute. The RRTP
budget allocation for 2022/23 is £111,570, which is significantly less than the
previous year. 
In 2022 Argyll and Bute Council agreed a statement (Annex 1) with the Scottish
Government which would provide a streamlined approach for any acquisition for
secondhand stock where the work costs do not exceed £75,000 of ASHP grant. 
This approach could increase the supply of affordable housing especially for priority
property types and sizes in areas of high demand (particularly where stock has
historically been depleted through Right to Buy). The Millknowe project in the previous
SHIP is an example of a buy-back property converted into a dementia friendly home.
This SHIP could use AHSP funding to purchase existing properties for people with
particular needs or for large families. Whether this approach should be used will be
assessed on a case-by-case basis. 
RSLs are currently considering the viability of private acquisitions in areas of the local
authority where there is identified need and demand. 
Off-the-shelf purchases- 
While it is expected that the majority of homes will be delivered through the SHIP
occasionally, the most appropriate approach to meeting particular needs may be best
satisfied by an ‘off the shelf’ purchase from developers. These will be considered on
a case-by-case basis. 
SHIP 2017/18 to 2022/23: 
Building on the 305 units completed between 2017/18 and 2019/20, there were a
further 143 units completed in 2021/22; bringing the five-year cumulative total to 448
affordable home. The equates to 81% of the Housing Supply Target outlined in the
previous LHS considerably higher numbers would have been completed by Covid
lockdowns shut down sites even when site were allowed to reopen there were
considerable restrictions on workforce numbers allowed on site resulting in slippage.
However, given the extremely challenging conditions of 2020/21 and 2022/23,
resulting from the pandemic and the resultant supply chain issues this is very positive
outcome. 
11) BUYBACKS, SECOND-HAND ACQUISITIONS AND OFF SHELF 
12) UPDATE FROM THE PREVIOUS SHIP 
Over the last five years 448 affordable homes have been created in Argyll and Bute.
Page 265

Page 266

TABLE 11:  SHIP New Build Homes by HMA & Project, 2021/22
Housing Market Area Projects Completions % of
total
Cowal Cairndow (Fyne Homes) 6 4%
Lorn Kirk Road (Dunbeg) (WHHA) 4 3%
Dunbeg phase 3 (Link) 115 80%
Helensburgh and Lomond Garelochhead (ACHA) 10 7%
Islay, Jura and Colonsay Imereval Phase 3 (WHHA) 8 6%
TOTAL 143 100% 
Four of the local RSLs contributed to the total programme. ACHA delivered 10 of the
new builds; Fyne Homes provided 6; West Highland completed 4; and Link completed
115 (This is partial completion of 300 units for Dunbeg Phase 3, with the remaining
units to be completed by 2023). In terms of tenure, 2 units (1.4%) were for shared
equity. 
The current year, 2022/23, is covered by the Strategic Local Programme Agreement
(SLPA) between the council, the Scottish Government, and the developing RSLs, and
the previous SHIP (approved in 2021); while this new SHIP will commence from
2023/24. The programme is subject to ongoing change as either barriers to progress
or windfall opportunities arise. Consequently, the following tables simply summarise
all proposals at the time of writing (August 2022), including those projects which were
expected to complete in 2022/23 and for which funding has already been drawn down.
It should be noted that the status of many future projects, particularly in the later years,
remains provisional and purely indicative at this stage; some may not proceed, or
complete, within the timescale. However there is also scope for additional proposals
to be brought forward or included in the programme. 
Further details of the programme and individual projects are outlined in the electronic
reports recorded on the Scottish Government’s Housing and Regeneration
Programme (HARP) system. 
TABLE 12: SHIP Projects Completions/Anticipated Completions in 2022/23
Project address Developer Units
Anticipated
Completion
Date
Inveraray Phase 2 ACHA 10 Completed
June 2022
Tarbert Phase 2 ACHA 4 Nov 2022
Millknowe Campbeltown ACHA 2 September
2022
Tom-A-Mhoid Road  Dunoon FYNE HOMES 1 March 2023
Dunbeg Phase 3 (remaining units) LINK 185 March 2023
Sawmillfields Helensburgh Wheatley Group 36 March 2023
Jura (Craighouse) WHHA 10
Completed
July 2022
Argyll & Bute 2022/23 Total Completions (est.) 248 March 2023
13) THE REVISED PROGRAMME 
Page 266

Page 267

If this programme is successfully delivered in full within the planning period (plus
completions in 2022/23), it could provide over 1,204 new affordable homes across
Argyll and Bute by March 2028. Projects islands account for 17% of houses to be
developed by the SHIP the rural mainland accounts for 18% of the programme; while
51% of units are in the key strategic settlements of Oban and Dunbeg; 10% in
Helensburgh; with 3% in the other main towns of Dunoon, Campbeltown and
Lochgilphead. 
There is an expectation that the majority of these units will be built to allow for future
adaptation to meet changing needs over time; and in addition approximately 10% (i.e.
120 units, if the above programme is delivered in full) should be purpose-designed to
medium or high dependency standards with potentially 60 of those units (5% of the
total) being fully wheelchair accessible.                                                                                                                                               
However, the council is currently in ongoing discussions with the HSCP to review and
explore potential housing models to meet the HSCP objective for enabling
independent living. 
In addition to this core programme, a number of other potential proposals are being
developed for further consideration in later years of the SHIP, subject to robust
assessments of need and demand, site assembly or acquisition, and available funding.
Some of these projects therefore remain notional at this stage or are subject to
development constraints that require to be addressed/ mitigated before they can
proceed. These projects are also dependent on clarification of local need or potential
demand to support growth and recovery agendas; and will be considered in future
updates of the SHIP. 
The council will also continue to actively explore other sites and projects out with the
core SHIP funding programme, as outlined in previous sections of this plan, where
these are consistent with LDP policy/housing land provisions and align with high
quality fit-for-purpose assessments of local housing need and demand. 
Page 267

Page 268

TABLE 13: SHIP Core Programme - Potential Completions by March 2028
Project address Developer Units Anticipated
Completion1
Bowmore Phase 4 ACHA 18 Year 1 (23/24)
Eton Avenue Dunoon  ACHA 4 Year 1 (23/24)
North Connel - Phase 2 ACHA 2 Year 2 (24/25)
Tighcargaman Port Ellen   ACHA 20 Year 2 (24/25)
Dalintober  ACHA 25 Year 2 (24/25)
Tarbert  ACHA 15 Year 2 (24/25)
Tarbert ACHA  15 Year 3 (25/26)
Coll  ACHA  10 Year 2 (24/25)
Keils  ACHA 4 Year 4 (25/26)
Jeanie Deans Helensburgh DUNBRITTON HA 12 Year 1(23/24)
Helensburgh Golf Club DUNBRITTON HA 62 Year 1 (23/24)
18th Tee, Helensburgh DUNBRITTON HA 16 Year 1 (23/24)
Cardross DUNBRITTON HA 37 Year 3 (25/26)
Succoth Phase 2, Arrochar DUNBRITTON HA 12 Year 4 (26/27)
Lochgilphead Riverside Drive Baddens FYNE HOMES 6 Year 1 (23/24)
Inveraray Phase 1 FYNE HOMES 16 Year 1 (23/24)
Ballochgoy Rothesay FYNE HOMES 10 Year 1 (23/24)
Rothesay Academy Phase 1 FYNE HOMES 30 Year 2 (24/25)
Inveraray Phase 2 FYNE HOMES 10 Year 2 (24/25)
Rothesay Academy Phase 2 FYNE HOMES  20 Year 4 (26/27)
Cairndow Phase 2 FYNE HOMES 4 Year 5 (27/28)
Tighnabruaich Phase 2 FYNE HOMES 10 Year 5 (27/28)
Dunbeg Phase 4 LINK 90 Year 2 (24/25)
Rosneath LINK 49 Year 3 (25/26)
Hospital Field site Oban LINK 50 Year 3 (25/26)
Lonan Drive Oban  LINK 44 Year 3 (25/26)
Glencruitten Oban LINK 100 Year 4 (26/27)
Dunbeg Phase 5 LINK 75 Year 4 (26/27)
Dunbeg Phase 6 LINK 75 Year 5 (27/28)
Port Charlotte Phase 1 WHHA 14 Year 1 (23/24)
Imeraval Phase 4 Islay WHHA 20 Year 1 (23/24)
Tobermory Phase 3  WHHA 12 Year 2 (24/25)
Port Appin Phase 1 WHHA 6 Year 2 (24/25)
Craignure  WHHA 22 Year 2 (24/25)
Colonsay WHHA 5 Year 2 (24/25)
Salen WHHA 8 Year 3 (25/26)
Port Appin Phase 2 WHHA 24 Year 5 (27/28)
Bunessan Phase 2 WHHA 4 Year 5 (27/28) 
Argyll and Bute Total  956 2023-2028 
1 NB. Timescales are indicative and subject to change; and will be monitored regularly.
Some projects could also revise their final number of units. 
Page 268

Page 269

RSLs have also identified future opportunities, which they will flesh over the next year
or so. These projects could be included in the later years of the SHIP. For example,
ACHA is exploring options on Mull such as Dervaig; and 4 units on Ulva. WHHA  is
keen to develop another stage of development in Imeraval in Islay and a project in
Oban town centre. WHHA are also keen to develop in, Lochawe and/or Dalmally if
demand is generated from the Cruchan Power Station expansion programme. Fyne
Homes would like to develop 20 units in both Dunoon and Lochgilphead. 
Finally, a number of community-led projects or private developments with associated
affordable requirements but no RSL attached, may be delivered out with the core SHIP
programme but will be significant adjuncts to this process and should deliver major
synergies with the SHIP. Several projects are already progressing, and two have been
completed. While small in scale these community-based projects deliver substantial
impacts at the local level, and help to ensure the viability and sustainability of fragile
communities. The following table summarises the current programme for rural and
island projects out with the core SHIP programme. 
TABLE 14: FUNDED COMMUNITY-LED HOUSING PROJECTS NOT COMPLETED
HMA PROJECT/COMMUNI
TY
UNITS
Mull & Iona Ulva (Refurb) 6
Mull & Iona Glengorm (Refurb) 5
Islay, Jura &
Colonsay
Port Askaig, Islay 2
Islay, Jura &
Colonsay
Scalasaig, Colonsay
Phase  1
12 units in total made up of
3 Self build plots, 
3 Private Rented units (Mowi) 
6 affordable housing units of which 4 are social rent
and 2 are shared equity 
The SHIP will continue to be appraised on an annual basis by the Scottish Government
and affordable housing outcomes are monitored regularly by the Council’s Housing
Management Team; local authority Members via the corporate Pyramid performance
management system; the overarching Community Planning Partnership via the ABOIP
framework; and partners on the Strategic Housing Forum; as well as the boards and
committees of the individual SHIP partners. In addition, as appropriate, wider stakeholder
involvement will be sought via consultation with local communities, private developers
and relevant particular interest groups. All pertinent feedback will help to inform the
ongoing development and regular revisions of the SHIP.               
The council has also been exploring potential mechanisms for establishing a wider
evaluation framework to capture the broader social return on investment and economic
impacts of the SHIP programme, as well as the basic cost effectiveness and value for
money of specific projects. Working with RSL partners, the council is keen to
implement a formal evaluation procedure which will capture evidence on the wide
range of strategic benefits that the SHIP actually delivers, beyond monitoring the basic
number of completions. 
14) MONITORING& REVIEW AND IMPACT ASSESSMENTS
Page 269

Page 270

In 2021/22, the council undertook a number of impact assessments during the LHS
process. The SHIP is an investment plan which sits underneath the LHS and sets out
how the LHS objectives can be delivered. Therefore, these impact assessments also
inform the SHIP. The impact assessments can be found on the council’s website.
 Equality and Socio-Economic Impact Assessment lhs_eqseia_sept_2021.pdf
(argyll-bute.gov.uk)
 Child Rights and Wellbeing Impact Assessment
childrens_rights_and_wellbeing_impact_acccessment_stage_abc_lhs_jan_202
2.pdf (argyll-bute.gov.uk)
 Health Impact Assessment APPENDIX 4: Template for scoping workshop
reports (argyll-bute.gov.uk)
 Islands and Communities Impact Assessment
lhs_island_communities_impact_assessment.pdf (argyll-bute.gov.uk)  
In future, the council will monitor and assess the impact of the SHIP and the LHS in
terms of the aforementioned impact assessments and in line with the principles of the
Fairer Scotland Duty. Any relevant findings from such assessments will be reflected in
the SHIP and future updates of the LHS and other associated plans, policies and
strategies. 
Strategic Environmental Assessment (SEA)
As the “Responsible Authority” under the terms of the Environmental (Scotland) Act
2005, the council has previously determined that the LHS (and by association it’s
ancillary component, the SHIP) does not require a full SEA.
sea_pre_screening_report_october_2021.pdf (argyll-bute.gov.uk)
The primary document in relation to land use planning is the Local Development
Plan which is subject to a full SEA and which will ultimately cover all housing projects
set out in the SHIP. 
Page 270

Page 271

The Argyll and Bute Strategic Housing Investment Plan for 2023/24 to 2027/28 sets out
an ambitious but realistic programme for the delivery of 956 new affordable homes; of
which the majority would be built to lifetime standards, allowing for future adaptation to
meet changing needs over time; and around 10% will be purpose-designed for specialist
needs, with half of those i.e., 5% of the total being fully wheelchair accessible. The
programme reflects a strong commitment to Argyll and Bute’s economic growth agenda
and will directly support the sustainability of fragile rural and island communities. 
The earlier years of the SHIP align with the LHS housing supply targets, published in
2022, of 215 new affordable homes per year; the later years are slightly below the target.
Several additional potential projects have also been suggested but are not as yet fleshed
out. These projects are likely to be considerations in later years, although if needs are
identified during the annual review of the programme, then these projects could be
brought forward.  In addition, new opportunities will emerge in time these combined with
the projects to be fleshed will raise the number of units in the later years of the SHIP to
align with the 5 year LHS target of 1075 affordable units. The council and its partners are
committed to maximising available resources where possible and will continue actively
to explore opportunities for growth in the programme.
The LHS targets take account of the council’s ambitious strategic objectives as well as
the potential increased demand for social housing arising from the consequences of the
coronavirus pandemic and the current economic crisis; the increased presence at the
MOD base in Helensburgh & Lomond; the anticipated impacts of the Rural Growth Deal
and other local and national resources and strategic imperatives for repopulation,
recovery and growth; and therefore the scale of the proposed programme is likely to be
more in line with actual requirements as well as our aspirational goals for Argyll and Bute. 
This SHIP clearly and directly aligns with the LHS and Argyll and Bute Outcome
Improvement Plan (ABOIP) outcomes; sets out a core programme which is feasible to
deliver; highlights the contribution of the council, developers and other partners;
evidences the support and facilitation role of the local authority; outlines the extensive
stakeholder engagement underpinning the planning and delivery of the programme; and
explicitly reflects the central importance of equality issues for all partners. 
CONCLUSION
Page 271

Page 272

Appendix 1 Individual Open Market Purchases Statement January 2022 
Scottish Government affordable housing supply guidance states:-
“It is expected that the majority of homes delivered through the Programme will be
new build units that are delivered either directly by grant applicants or through ‘off
the shelf’ purchases from developers. However, where it can be demonstrated
that the use of grant to acquire ‘second hand’ stock that is for sale on the open
market is the most appropriate method of meeting housing need in a particular
area, subsidy may be available to fund this, subject to agreement between the
Council and the Scottish Government. Funding may also be made available to
remodel/ rehabilitate existing properties where this is considered a strategic priority”.
Argyll and Bute Council will consider a limited number of individual, second hand
open market purchases if the following criteria are met: 
 There is a need for the size and type of housing in the town/settlement, (this
will be determined by the current housing need and demand assessment) 
 Land availability and infrastructure issues are a barrier to delivering the
affordable housing target in the area through new build development
 The purchase will not result in homelessness
 The purchase price must reflect the condition of the property. 
Second hand open market purchases will be prioritised as follows: 
1. Where the purchase will assist the RSL to meet general housing need as   
identified in the HNDA and agreed with Argyll and Bute Council.
2. Where the purchase will assist the RSL to meet particular housing need as agreed
with Argyll and Bute Council.
3. Where the purchase will bring an empty property back into occupation
4. Priority will be given to acquiring properties that are in good/reasonable condition.
Each property will require a valuation and condition survey completed by the District
Valuer or other RICS Chartered Surveyor. Vendors must pay their own costs. 
Applicants should note the following:-
 Grant requested must be the minimum level of grant required to deliver the
project.
 Grant requested should exclude costs for any works normally funded by the
Association’s capital maintenance/cyclical programme.
 Streamlined submissions for acquisition only, the maximum Scottish
Government grant will be up to £50,000 or 50% of the acquisition value,
whichever is the lower.
 Streamlined submissions for acquisition and works, grant will be up to
£75,000 maximum for each property. This will encompass the purchase price
and any works required to the property.
 Where grant required for acquisition and works cost is higher than £75,000 a
full value for money appraisal will be required and acquisitions should not be
completed before confirmation of Scottish Government and Council
agreement on the level of costs. 
Page 272

Page 273

APPENDIX 2: SHIP DEVELOPMENTS ACROSS ARGYLL & BUTE:
Projects in the Core Programme 2023-2028 
Projects approved in the 2022-2027 SHIP. These are
due to be completed in years 2-5 of that SHIP i.e. 2023-
2027 
New projects 
Page 273

Page 274

THIS DOCUMENT IS
AVAILABLE ON THE COUNCIL WEBSITE AT: 
Local Housing Strategy and Housing Need and Demand Assessment   
This document can also be made available in other formats on request. 
Contact:
LHS Team
Argyll & Bute Council
Dolphin Hall
Manse Avenue
Dunoon
Argyll & Bute Council PA23 8DQ 
Telephone: 
01369 708 679 
01631 700 058 
Email: Hristina.tarpanova@argyll-bute.gov.uk 
Page 274

Page 275

ARGYLL AND BUTE COUNCIL                                     COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH     29 SEPTEMBER 2022
HOUSING ANNUAL ASSURANCE STATEMENT 2022 
1.0 INTRODUCTION
1.1 Council Homeless Services are subject to scrutiny and inspection by the Scottish
Housing Regulator (SHR). The Council must demonstrate that it is meeting the
statutory requirements contained in the Scottish Social Housing Charter. Argyll
and Bute Council is no longer a social landlord but retains statutory duties to
provide services to households who are homeless or threatened with
homelessness. The Council submits an Annual Return on the Charter (ARC). In
2019 the SHR introduced a requirement for all local authorities to submit an
Annual Assurance Statement which will be published on the SHR website. This
report details the proposed Statement for 2022.   
2.0 RECOMMENDATIONS
2.1 It is recommended that the Council approve the Annual Assurance Statement
contained in Appendix 1 of this report.  
3.0 DETAIL
3.1 The SHR produced a document entitled Regulation of Social Housing in Scotland
in February 2019. The regulatory requirements are set out in Section 3 of the
document and even though Argyll and Bute Council is no longer a social landlord,
there are requirements for the Council to ensuring that statutory duties are met in
relation to preventing and alleviating homelessness.  
3.2 The SHR issued an Engagement Plan to Argyll and Bute Council Housing
Services in March 2019. This plan was not updated in 2020 and 2021 due to the
COVID 19 pandemic. In 2022 the SHR wrote to the Council to state that they
would be engaging in general terms about the delivery of homeless services. As
a result there continues to be 4 areas in which the SHR can engage with the
Council in relation to homelessness services:-
 How people access the service; 
Page 275 Agenda Item 15

Page 276

 The assessment of homeless applications; 
 Access to and quality of temporary accommodation; and 
 Outcomes for people who are homeless.  
The SHR are proposing to engage with Argyll and Bute Council in relation to Argyll
and Bute’s assessment of homeless applications and the outcomes for people
who are homeless. The elements within these categories are detailed in the
Annual Assurance Statement (Appendix 1) and the progress made in these
areas of work. 
3.3 In addition to the 4 areas of engagement, an update on the impact of COVID 19
on the homeless service has been included in the 2022 Annual Assurance
Statement.
3.4 Members are kept informed of the Council’s performance in relation to statutory 
and regulatory requirements in relation to housing in various ways:-
 Through the Corporate Pyramid Reporting System; 
 Through quarterly Housing Performance Reports submitted to
Committee; 
 Through the quarterly reporting produced for the Strategic Housing
Forum; 
 Through the Annual Updates on the Local Housing Strategy; and 
 Through an Annual Housing Activity report submitted to the 4 Area
Committees
3.5 The Council has produced an Equalities and Human Rights statement in
relation to homelessness. This includes a commitment to analyse data relevant
to assessing the impact on services across all groups. 
4.0 CONCLUSION
4.1 The Development and Economic Growth Service’s Housing Team will continue
to improve services to households who are homeless or threatened with
homelessness. The Housing Team will continue to engage with the SHR to report
on progress on the housing and homeless services provided in Argyll and Bute. 
5.0 IMPLICATIONS
5.1 Policy – None.  
5.2 Financial – Sufficient budget is required to deliver statutory services.  
5.3  Legal – None.
5.4  HR – None.
5.5  Fairer Scotland Duty: 
Page 276

Page 277

5.5.1   Equalities - protected characteristics – access to services across the local
authority area provided.  
5.5.2   Socio-economic Duty – addressing and preventing homelessness enables
households to address other issues such as income maximisation and
exploring employment opportunities.  
5.5.3 Islands – homeless advice and prevention services are provided on the
islands.  
5.6 Climate Change – None.   
5.7  Risk – the Council will be subject to censure from the SHR and Scottish
Government if statutory duties are not fulfilled.   
5.8  Customer Service – Area teams provided the service across the local
authority.   
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Councillor Robin Currie, Policy Lead for Economy and Rural Growth                                                  
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Douglas Whyte, Team Lead – Housing Strategy 
Douglas.Whyte@argyll-bute.gov.uk 
APPENDICES
Appendix 1 Housing Annual Assurance Statement 2022 
Page 277

Page 278

APPENDIX 1 – HOUSING ANNUAL ASSURANCE STATEMENT 2022 
Argyll and Bute Council       
Housing Annual Assurance Statement 2022
Legislative Compliance
We can confirm that Argyll and Bute Council achieves all the standards and
outcomes for people who are homeless and others who use our services:-
 All relevant regulatory requirements set out in Chapter 3 of the Regulatory
Framework
 All relevant standards and outcomes in the Scottish Housing Social Charter
 All relevant legislative duties 
Argyll and Bute Council can confirm that there were no breaches of the Unsuitable
Accommodation Order in 2021/22.
Argyll and Bute Council can confirm that there were no health and safety breaches in
2021/22 in relation to homelessness resulting in intervention by the Health and
Safety Executive.
In 2021 the Council fulfilled its commitment from the previous Assurance Statement
to produce an Equalities and Human Rights Statement with specific reference to
Homelessness. This states that the Council will “Ensure that all households
approaching the Council for housing advice including making homeless applications
are treated fairly with dignity and respect. 
Housing Services staff will work to understand the individual needs of service users
and deliver services that recognise and meet these needs. Housing Services will
assure the Scottish Housing Regulator that Housing Services comply with statutory
obligations.   
In addition, the Argyll & Bute Local Housing Strategy 2022-2027 was launched in
April 2022.  This incorporates a comprehensive equalities statement and is
underpinned by a suite of impact assessments which encompass Homelessness
amongst other related housing services and functions. As well as a full Equalities
and Socio-Economic Impact Assessment, the Council has carried out impact
Page 278

Page 279

assessments for the LHS in respect of Human Rights, Children’s Rights and
Wellbeing, Island and Rural Communities, as well as a Health Impact Assessment. 
All materials are available on the council website at: Local Housing Strategy and
Housing Need and Demand Assessment (argyll-bute.gov.uk). 
The LHS also includes a key action point to implement a detailed equalities data
monitoring and reporting framework which will be reported annually to Housing
Management Team, Area Committees and full Council, the Strategic Housing forum
partnership and to the Scottish Government. 
In 2019 The Scottish Housing Regulator notified Argyll and Bute Council that they
would be engaging with the Council over 2 areas of work based on the Scottish
Government national statistics for 2017/18 and the Annual Returns of the Charter :-
 Argyll and Bute’s assessment of homeless applications
 Outcomes for people who are homeless 
The tables below provide an update on the areas of engagement previously notified
by the Regulator in 2019. 
Argyll and Bute’s Assessment of Homeless Applications 
No. Area of Engagement Progress Made
1. The percentage of
households assessed as
not homeless nor
threatened with
homelessness is above the
Scottish average
Argyll and Bute figures – 4% of cases
at the end of 2021/22 compared to 5% of
cases at the end of 2020/21 compared to
5% of cases at the end of 2019/20. 
Scottish Average for 2021/22 – 3%
2. The percentage of
households assessed as
intentionally homeless is
the same as the Scottish
average
Argyll and Bute figures – less than 1%
at the end of 2021/22 compared to 1% of
cases at the end of 2020/21 compared to
7% of cases at the end of 2019/20 
Scottish Average for 2021/22 – 1%
3. The percentage of
households withdrawing
their homeless application
before decision is the
Argyll and Bute figures – 5% of cases
at the end of 2021/22 compared to 5% of
cases at the end of 2020/21 compared to
3% of cases at the end of 2019/20 
Page 279

Page 280

same as the Scottish
average
Scottish Average for 2021/22 – 5% 
Outcomes for People who are Homeless
No. Area of Engagement Progress Made
1. The percentage of people
in Argyll and Bute
assessed as
unintentionally homeless
which it provided with a
Scottish Secure Tenancy
is above the Scottish
average
Argyll and Bute Figure for 2021/22 – 87%
2020/21 – 81%
2019/20 – 67%
Scottish Figure for 2020/21 – 76%
86% of all unintentionally homeless cases
secured settled accommodation in 2020/21
compared to 80% across Scotland 
2. There are a relatively high
number of people waiting
for more than one year for
an outcome
Argyll and Bute Council continues to work
with partners to implement a Rapid
Rehousing Transition Plan (RRTP) which
will address this situation. The RRTP Annual
Update was approved by Council and
submitted to the Scottish Government in
June 2022. 
The Regulator contacted the Council in March 2022 to state that there will be
engagement about the Council’s services for people who are homeless. The
Regulator will assess the risks to people who are threatened with or experiencing
homelessness by engaging with the Council during 2022/23.
The Impact of COVID 19 on the Homeless Service in Argyll and Bute
As reported in the Annual Assurance Statement 2021 the Council continued to
provide a service to households in need of accommodation during the COVID 19
pandemic. Regular contact continues to be maintained with households and housing
support services continue to provide support to households to ensure that they are
able to sustain their accommodation. 
As a Stock Transfer authority the Council continues to work effectively with the
Registered Social Landlords to secure permanent housing for statutory homeless
households. 
Page 280

Page 281

I can confirm that the Council has sufficient assurance and scrutiny processes in
place to support this statement.
Signed 
Kirsty Flanagan
Executive Director   
Signed 
Councillor Robin Currie
Leader of Argyll and Bute Council / 
Policy Lead for Economy and Rural Growth 
Page 281

Page 282

This page is intentionally left blank

Page 283

ARGYLL AND BUTE COUNCIL                                                                                 COUNCIL 
ROADS AND INFRASTRUCTURE SERVICES                              29 SEPTEMBER 2022 
HELENSBURGH WATERFRONT DEVELOPMENT – CAR PARKING 
1.0 INTRODUCTION 
1.1 The development of Helensburgh Waterfront has been a long term project designed to
provide a new and high quality leisure development, repurposing a car park and associated
assets, improve coastal defences and provide commercial opportunities for retail
development. The development as a concept was identified in the masterplan for the wider
site which was subsequently agreed at the Council meeting on 22nd November 2012. 
1.2 Construction of the leisure centre is now complete and the facility open. Discussions
relating to the operation of the car park, the charging regime and associated parking
management have been ongoing for some time. Originally it had been proposed that the
car park would be fully charging using the standard hourly rate for off street car parks. In
July this year Commercial Services, as part of the emerging management plan for the
leisure complex and following representations from Live Argyll, sought a proposal for all of
the Pier Head car park to be free for the first 2 hours with charging thereafter. This proposal
has been made to help to ensure that the leisure development operates to intended
capacity, provides an incentive for individuals to use the facility and encourages users,
who need to travel by car, to park near to the leisure facility rather than occupying on street
parking spaces nearby. The parking proposal also supports recent advice received relating
to the retail element of the development. 
1.3 Local Members have been briefed via a Business Day Meeting on the proposals for making
the car park free for 2 hours and are broadly supportive of this.  To introduce a free parking
period would be a change in Policy requiring agreement by Council. The projected
difference in parking income being some £24,000 less than the income received prior to
the development commencing. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Council:
(i) Agrees that the Helensburgh Waterfront car park be amended to provide free
parking for the first 2 hours and charged thereafter and;  
(ii) Agrees that officers progress a Traffic Regulation Order covering the new car
park with the flexibility to enable free parking for the first 2 hours with any
representations received during the TRO process being reported back to the
Helensburgh and Lomond Area Committee. 
3.0    BACKGROUND
3.1 The development of Helensburgh Waterfront is a key project for the council. As the
Page 283 Agenda Item 16

Page 284

construction of the new Leisure Centre has concluded, the site of the old pool, once
demolished, will be available for development. This development proposal aligns with the
masterplan for the wider site which was agreed at the council meeting on 22nd November
2012. As part of the agreed proposal this area of the site is proposed to be developed for
retail use of around 2,700sqm. 
3.2  As part of the first phase of development at the waterfront, a car park extending to 265
spaces has been constructed as shown on the plan attached as Appendix 1. It was initially
intended that this car park will be operated as a pay for car park by the Council with
income being included as part of the Council’s overall revenue budget. The car park forms
an important parking asset within Helensburgh. The wider parking strategy for
Helensburgh and the whole of Argyll and Bute is subject to an ongoing parking review
exercise which will be presented to Members once concluded. 
3.3 The new layout and car park replaces the original larger Pier Head car park which
provided a mix of free car parking of approximately 320 spaces and had an additional 236
chargeable spaces. It had originally been proposed that any loss of spaces resulting from
the Waterfront Development would be from the free parking area at the far end of the car
park and that the new car park would be chargeable to replace the previous car park
facility and to maintain the budgeted income. The car park serves the wider town centre
and not just the new Waterfront Development. In regards to traffic management, the use
of on and off street parking places needs to be considered holistically to help to ensure
that there is a reasonable turnover of parking spaces available to support local business
by providing parking opportunities. 
3.4 There have been ongoing discussions relating to the operation of the car park, the charging
regime and associated management for some time. Originally it had been proposed that the
car park would be fully charging using the standard hourly rate for off street car parks. In
July this year Commercial Services, sought a proposal for the new car park to be free for
the first 2 hours and charging thereafter. The rationale for this is to help to ensure that the
leisure development operates well, provides an incentive for users and encourages users
of the facility to park near to the leisure facility rather than occupying on street parking
spaces nearby. 
3.5 The current fees and charges policy for 2022-23 and the Council’s Parking Policy does
not enable any change to charges within the Waterfront car park. Any proposed change
would therefore need to be agreed by Council as a policy change. 
3.6 Consideration will also have to be given to enforcement and management of the 2 hour
free charging period as staff would need to be there more frequently to ensure the car
park was being used correctly and not abused, which could ultimately have a detrimental
effect on the traffic management of the development and town centre areas, as vehicles
staying there for long periods would displace other vehicles into the town centre due to a
lack of turnover of spaces. This will require additional patrols and place extra demand on
a small enforcement team covering other areas including tourist hot spots such as Luss,
Duck Bay and Arrochar. This was previously highlighted as part of the response to the
planning application in August 2018. It may be necessary to increase the amount of
warden coverage to accommodate any additional demand. 
3.7 The 2 hours free parking would require the driver/occupant of the vehicle to obtain a ticket
which would confirm the date and time of arrival. The first 2 hours would be free with any
additional parking incurring the standard parking charge. Additional topping up could be
Page 284

Page 285

carried out remotely using the Council’s parking App or a ticket purchased for the duration
of the intended stay when this would exceed 2 hours. 
3.8 The new Leisure Centre will be operated by the Leisure Trust who have raised the
following concerns if the car park is operated as a standard chargeable parking area: 
3.8.1 Memberships: The Leisure Trust require to increase use and membership of the
facility to cover operational costs. The Leisure Trust have advised that standard parking
charges will result in an estimated reduction in income from memberships equating to
£30,000 to £100,000 per year depending on the level of parking charges. 
3.8.2 Staff: The Leisure Trust have requested that staff are provided with access to
free employee car parking as this is the case across most Leisure Trust facilities (such
as halls, community centres and some leisure facilities). 
3.9 The other significant use proposed for the Waterfront Site is a commercial development
of predominantly retail use on the site of the old swimming pool. As part of the early site
assessments specialist retail advisors Avison Young have confirmed that food retailers in
particular will not be interested in the retail site unless they have a minimum of 2 hours
free parking for customers. 
3.10 Possible Options for managing the car park include the following: 
3.10.1    Restricted free period – 2 hours free: A compromise position, and one which
aligns with the recent request from Commercial Services in response to requests from
Live Argyll and commercial retail advisors is that a period of 2 hours offered free with
charges applying thereafter. This supports both the Leisure Centre members and the
retail development while still managing the car park, avoiding anti-social issues and all
day parking. However this would result in a substantial drop in income to the Council from
parking revenues estimated at £24,000 pa, this would require a corresponding reduction
in the budgeted parking income to avoid a deficit. This may be balanced by increased
income for the Leisure Trust from memberships (estimated at £30,000 per year minimum)
and income from the retail development. Roads and Infrastructure have also advised that
this type of parking would be more difficult and time consuming to enforce and would
require a review of the current warden service to ensure adequate enforcement. To
facilitate this a TRO amendment process will be required and only when this is successful
would the Council be able to waive charges for the first 2 hours. Appendix 2 details the
TRO process. 
3.10.2 Standard parking charges: This would generate the most income from parking
(estimated at a minimum of £30,000pa at the Pier Head but could be substantially more)
and would see the remaining paid for car parks continue much the same. However, based
on the representation from Live Argyll would result in a consequent loss of income from
the Leisure Centre (estimated at a minimum of £30,000 per year). It should be noted here
that the current budget income for the Council is based on this figure and any change to
the parking charges needs to be agreed as part of the Council’s budgeted income.   
3.10.3 Free car parking – This may be a popular choice for the local community
however, this would remove the income historically generated from parking and make the
remaining pay car parks less attractive. The loss in income is estimated to be around
£50,000 to £60,000 pa across all the charging Helensburgh car parks. This could also
lead to a situation where neither the Leisure Centre nor the retail units benefitted, as the
Page 285

Page 286

spaces could be taken by commuters, workers and other all day parking. This would then
lead to traffic management issues in and around the town centre of Helensburgh as local
residents and visitors search for a parking space. 
3.11 In budgetary terms it is considered that the balance between gaining parking income for
the Council  and losing Leisure Trust income may well suggest that standard parking
charges doesn’t generate a significant overall financial benefit. 
3.12 However in operational terms, deciding not to operate standard parking charges could
have other impacts such as: 
 Pressure from other towns / Members across Argyll for similar
arrangements which could lead to a wider impact on parking management
and income.
 Increased resources from council enforcement staff with increasingly limited
financial returns.
 Providing free parking encourages car use which is at odds with the
council’s climate change targets. However this could be countered by the
argument that parking charges may cause users to drive further to
Dumbarton or other centres with free parking. 
3.13 Similarly free car parking isn’t a recommended option as this will lead to spaces being
blocked by all day users / businesses, vehicles being abandoned and a disruption to the
overall parking strategy. 
3.14 Therefore the option which is considered to offer the best compromise is a managed car
park with a restricted free period. This isn’t without some compromise, particularly for the
Council with a loss of budgeted income of over £24k from its annual budget and increased
demand on limited parking management resource. 
4.0 CONCLUSION 
4.1 The waterfront retail site is of strategic importance to the council and to Helensburgh
and therefore the operation of the communal car park requires to be carefully
considered. 
4.2 To ensure that the new leisure facility is a success and that the retail site can be
marketed the option of a restricted free period of 2 hours parking is considered to offer
the best compromise. 
4.3 The impact of the above proposal would reduce potential parking income for the Council
by approximately £24k per annum. This would need to be taken into account with a
corresponding reduction to parking income required to be recognised in budgeted
income levels along with the increased resources required to manage the operation of
the car park. 
5.0  IMPLICATIONS
5.1 Policy – the proposal for 2 hours free parking require Council approval due to the
predicted reduction in parking income.
Page 286

Page 287

5.2 Financial – Budgeted council income from parking in the Helensburgh area will be
reduced by these proposals and this pressure will be built into the budget outlook from
2023-24 onwards. 
5.3 Legal - The terms and conditions of any management arrangements to follow are
intended to be delegated to the Executive Director of Customer Services.
5.4 HR – Additional demands on parking warden/enforcement resource. 
5.5 Fairer Scotland Duty 
5.5.1 Equalities – Protected characteristics – None Known
5.5.2   Socio economic Duty – None Known
5.5.3 Islands – None Known
5.6 Climate change – Any large development project will have sustainability issues to
address. However this development is designed to deliver local services to reduce the
need for residents to travel to other destinations which will be a positive impact.
Offering free car parking periods can be seen as contradictory to this but is balanced
by reducing travel to other further away destinations. There are a number of cycle
parking racks available at the leisure development and it would be desirable if users of
the facility would transition their mode of travel to active travel choice rather than
relying on car travel. There are also a number of e-vehicle charging points on the car
park which will be reserved specifically for e-vehicle use.
5.7 Risk – If the car parking is not managed correctly there is a risk that the new leisure
and retail facilities will not deliver the anticipated outcomes. There is also a risk that
the overall parking arrangements in Helensburgh will be distorted if the parking
arrangements are not holistically addressed.
5.8 Customer Service – None.
Kirsty Flanagan, Executive Director with responsibility for Roads and Infrastructure
Services 
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services
Councillor Andrew Kain – Policy Lead, Roads and Transport 
24th August 2022 
APPENDICES 
Appendix 1 – Layout Plan 
Appendix 2 – TRO Process 
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Jim.Smith@argyll-bute.gov.uk 01436 657 620
Hugh O’Neill, Network & Standards Manager
Hugh.O’neill@argyll-bute.gov.uk 01546 604 084
Page 287

Page 288

APPENDIX 1 – LAYOUT PLAN 
Page 288

Page 289

TRO Process 
1. Pre non-statutory discussions with local groups to develop proposals.
2. Seek agreement from Helensburgh & Lomond Area Committee to begin
statutory TRO process.
3. Stage 1 Consultation – defined by Regulations.  Seeks comments only at this
stage.
4. Stage 2 Consultation – defined by Regulations but note that the Traffic
Authority should consult with all those “affected” by the proposals.  This allows
Officers to include other “non-statutory” bodies which may be affected by the
proposed TRO.  Seeks comments only at this stage.
5. Stage 3 Consultation – public consultation exercise.  At this stage any person,
body or organisation may submit an objection.  Officers then respond to
objections, however, if an objection is not formally (in writing) withdrawn then
it must be considered extant.
6. If no objections are received the Order can be made.
7. If objections are submitted and not withdrawn a report will be taken to the
Area Committee for consideration.  The following options are available to the
Committee:
a. To abandon the Order;
b. To amend the Order;
c. To hold Discretionary Hearing;
d. To make the Order as published.
8. Notwithstanding the above, if an objection is submitted in regards to certain
key restrictions (for example “no loading”) then the Committee has the
following options:
a. To remove the restriction from the Order;
b. To abandon the Order
c. To refer the Order to an Independent Reporter for a Hearing (different
from a “Discretionary Hearing”).  The Reporter submits
recommendations back to the Area Committee at the conclusion of the
process for consideration.
9. At the end of the processes detailed in points 7 & 8 above, assuming the
Members determine that the Order should be made, the Order is then Signed
and Sealed by Legal & Regulatory Support.
10. There is then a 6 week “pause” to allow for procedural challenge to be made.
11. Assuming no such challenge is made, the Order is implemented. 
Page 289

Page 290

This page is intentionally left blank

Page 291

ARGYLL AND BUTE COUNCIL      
Argyll & Bute Health and Social Care Partnership       
Child Poverty Plan Annual Review 2021-22 
1.0 EXECUTIVE SUMMARY 
The Argyll and Bute Child Poverty Action Plan Review 2021-2022 is the third review
of the Child Poverty Action Plan first published in 2019.  It is a requirement under the
2017 Child Poverty (Scotland) Act that local authorities and health boards jointly
produce and publish an annual review of their plan, setting out work being undertaken
to tackle child poverty in their region.  This action is required up until 2030 and includes
key target years of 2023 and 2030 for particular levels of progress to be achieved. 
The Argyll and Bute Child Poverty Action Group, led by Fiona Davies (Chief Officer;
Argyll & Bute Health and Social Care Partnership) have produced this year’s review
to reflect the work of its members and others working to tackle child poverty across
the region.  It reflects a strong children’s rights approach and the vision shared vision
that:
We want an Argyll and Bute where no-one lives in poverty. Everyone should be able
to achieve their potential and feel healthy, happy and valued. We want to be a place
where everyone understands that tackling poverty is a shared responsibility. We
believe that if we act locally, and in partnership, we can make a difference.  
A child friendly SWAY version of the plan has been created for engaging with children
and young people.  It is hoped that this will be developed into a One Page Plan, graphic
version that will also be of real value in working with children and also adults who might
prefer this presentation to reading a long report.  
Current Child Friendly SWAY
https://sway.office.com/od2HbGlr940R2j3u?ref=Link 
Page 291 Agenda Item 17

Page 292

ARGYLL AND BUTE COUNCIL     
Argyll & Bute Health and Social Care Partnership         
Child Poverty Plan Annual Review 2021-22 
2.0 INTRODUCTION 
2.1  In 2017 the Child Poverty (Scotland) Act came into force as an attempt to put
in place measures that would reduce the concerning increase in child poverty, both on
a national and local level. The Act introduced a new requirement for local authorities
and each relevant Health Board to jointly prepare a Local Child Poverty Action Report
and to review it on an annual basis until 2030. The Scottish Government publishes a
national child poverty report, “Every Child Every Chance” which sets out the national
measures taken to address the issue and this too is reviewed annually. In 2022 a
second delivery plan was published” Best Start, Bright Futures: Tackling Child Poverty
Delivery Plan 2022-202”.
Of particular relevance to the duties under the Child Poverty (Scotland) Act are Parts
1 and 3 of the Children and Young People (Scotland) Act 2014. Part 1 requires public
authorities to publish, as soon as practicable after the end of each 3 year period, a
report of what steps it has taken in that period to secure better or further effect within
its areas of responsibility of the UNCRC requirements. Of particular relevance to the
issue of child poverty are the following articles: 
 Article 3 (best interests of the child) 
 Article 6 (life, survival and development) 
 Article 12 (respect for the views of the child) 
 Article 26 (social security) 
 Article 27 (adequate standard of living) 
The Child Poverty Action Plan and the Children’s Rights Report are closely linked and
should in turn be linked to key Council and Health Board strategies and plans, for
example the Children and Young People’s Service Plan 2020 – 2023. It should be
noted that child poverty and children’s rights are issues not limited to Children’s
Page 292

Page 293

Services or the HSCP but are a wider responsibility that Council departments and
partners need to be cited on. 
The Plans also link to the Fairer Scotland Duty. This is an overarching strategic duty
on public bodies. It has interactions with the Equality Act 2010 and Scotland Act 2016;
and came into force on 1 April 2018. The Duty requires that: “An authority to which this
section applies must, when making decisions of a strategic nature about how to
exercise its functions, have due regard to the desirability of exercising them in a way
that is designed to reduce the inequalities of outcome which result from socio-
economic disadvantage.” In ensuring that this obligation is met, Equality and Socio-
Economic Impact Assessments (EQSEIA’s) must be carried out when new plans and
strategies are being developed. Children’s rights obligations call for a similar process
to be carried out and Child Rights and Wellbeing Impact Assessments (CRWIA’s) to
be completed. Work is currently taking place in Argyll and Bute to integrate these two
assessment documents into one process. 
The 2017 Act set four targets relating to ending child poverty, which the Scottish
Government committed to trying to achieve by 2030. The targets for children living in
households in Scotland are that: 
 less than 10% of children live in relative poverty (relative poverty is less than 60% of
average household income for the year taking account of the size and composition of
the household);
 less than 5% of children live in absolute poverty (absolute poverty is less than 60%
of average household income for the financial year beginning 1 April 2010); 
 less than 5% of children live in combined low income and material deprivation (low
income is defined as less than 70% of average household income for the year, material
deprivation is when families are unable to afford three or more items out of a list of
basic necessities); 
 less than 5% of children live in persistent poverty (persistent poverty is where a child
has lived in relative poverty for three out of the last four years). These are all measured
after housing costs are deducted. 
The Act also sets out interim targets which are to be met in the financial year beginning
1 April 2023.  These are all measured after housing costs are deducted.
 Less than 18% of children are in relative poverty 
 Less than 14% of children are in absolute poverty 
 Less than 8% of children are in combined low income and material deprivation 
 Less than 8% of children are in persistent poverty. 
3.0 RECOMMENDATIONS 
3.1 The council is asked to consider and note the work undertaken and potential
impact faced by the cost of living increase.   
Page 293

Page 294

4.0 DETAIL 
4.1  In 2019 the Argyll and Bute Child Poverty Action Group, a multiagency body
was set up to oversee the implementation of the local Child Poverty Plan, review it
annually and find ways to best use existing resources and develop new initiatives.
Following approval and publication there is an obligation for it to be submitted to
Scottish Government. 
Local Child Poverty Figures
On the 12th of July 2022 the End Child Poverty coalition published the latest local child
poverty figures.  Their research, covering the period to 2020/21, provides the best
available estimates of child poverty at local authority level (below 60% median income
after housing costs).  Figures for Argyll and Bute are as follows: 
2020-2021 - 18.8%; a reduction of 1.8% from the 2014-2015 figure of 20/7%  
The current review introduces the challenges the year has brought in terms of food
shortages, a cost of living crisis and the war in Ukraine.  
It also notes progress as working with The Poverty Alliance, One Parent Families
Scotland and The Child Poverty Alliance we put together a broad range of training
events for our multi-agency staff group and others.  Also noted is our commitment to
#Keeping The Promise and our continued development of a trauma informed
workforce.  
Adding to this is our commitment to train staff in Dyadic Developmental
Psychotherapy.  Other positives noted include client gain of £10,165,000 from our
advice services, engagement in schools, Hermitage Academy becoming the first high
school in Argyll and Bute to receive gold accreditation in UNICEF UK’s Rights
Respecting School programme and the success of the Flexible Food Fund.          
It notes that nationally there has been the publication of the Scottish Government’s
second Tackling Child Poverty Delivery Plan, “Best Start, Bright Futures 2022-2026”. 
We state that we approve that it say the 2030 targets require us to work differently –
placing an ever greater focus on families and the places they live.  We make the point
that rural, remote and island living can have additional challenges and costs that need
to be considered.  The high and immediate risks to people in Argyll and Bute due to
fuel poverty are emphasized as are the mental and physical health costs of poverty.       
Reasons for this Child Poverty Review
It is noted that the 2017 the Child Poverty (Scotland) Act introduced a new requirement
for local authorities and each relevant Health Board to jointly prepare a Local Child
Poverty Action Report and to review it on an annual basis until 2030.
Pupil Voice on Childhood Poverty
The report includes a reflection from a variety of school age young people giving their
views and feelings of pupils, these were collected by schools in engagement
exercises.  
Children’s Rights
Page 294

Page 295

The report notes that Children’s rights are fundamental to all work tackling child
poverty and should be reflected in the principles and objectives of all services that
support children.  This means not only direct services such as education, health and
social care but also our political, social and economic infrastructures. When we look
at a Strategic Children and Young People’s Service Plan from a Health and Social
Care Partnerships (HSCP) we expect to see needs and children’s rights identified and
considered.  Local Authorities also need to show that is happening, for example, when
a road is planned, street lighting changed or a Commissioning Strategy developed.  
The Promise
A key consideration when looking at our work on tackling child poverty in Argyll and
Bute must be keeping The Promise.   The Promise, launched by the Scottish
Government in Autumn 2020 originates in the findings of The Care Review and makes
a commitment to care experienced infants, children, young people, adults and families,
that  every child grows up loved, safe and respected, able to realise their full potential. 
It demands a multi-agency approach to support shifts in policy, practice and culture
across Scotland and make the difference that is required.  In Argyll and Bute a strong,
multi-agency commitment has been made to delivering on The Promise and that work
has continued, despite the considerable barriers raised by the Covid-19 pandemic, EU
exit and the current cost of living crisis.
Our Challenge
This area notes the particular challenges faced by Argyll and Bute, with regards to
areas such as fuel poverty, the economy, infrastructure and demographics.  It includes
statistical data.  Under sustainability it notes work being carried out in connection with
the UK Community Renewal Fund, Island Community Hall Connectivity Project and
Rural Growth Deal.  Also noted here is work on school clothing banks, free period
products and the Food Forum.
Training
One of our commitments for the year 2021 – 2022 was to deliver training, related to
understanding and tackling child poverty, for a wide range of staff groups across Argyll
and Bute.  This was made possible by monies from the Flexible Fund which enabled
us to commission the Poverty Alliance, Child Poverty Action Group and One Parent
Scotland to work with us.  A number of training packages were developed and
delivered on multiple occasions. The nature and impact of this training is noted.   
Key Areas of the Plan:
This section notes key areas of work undertaken in relation to child poverty; they are
recorded under the 3 Drivers of Poverty, helping families in other ways and planned
future work.   
A. Increasing Income from Employment and Earnings
Employability; The Scottish Government’s Islands Programme (IP); Skills
Development Scotland; Learning HUBS; Council Apprenticeships; Education; Early
Years; UHI Argyll and University of the Highlands and Islands.
B. Increasing Income through Benefits
Flexible Food Fund; Client Gain through Advice Activity.
C. Cost of Living
Page 295

Page 296

Housing; Fuel Poverty; Social Security Scotland; Free School Meals and holiday
Provision; Argyll and Bute Community Food Forum; Good Food Nation and Food
Strategy; Bute Advice Service; Free Period Products; School Clothing Banks; The
GRAB Trust (Group for Recycling in Argyll and Bute); ReStyle Argyll; LORI; Kintyre
Recycling; Re-Jig.
D. Helping Families in Other Ways
Infant and Perinatal Mental Health Services; Youth Work Education Recovery
Learning Programme; What are Carers Centres and MAYDS doing to support Young
Carers in Argyll & Bute?; Transforming Responses to Violence against Women and
Girls; Free School Meals Delivered by Drones; Universal Pathway Quality
Improvement Collaborative Financial Inclusion Practicum (UPQIC); Flexible Fund.
E. Other Planned Work 
Rural Growth Deal; Local Authority Covid Economic Recovery Fund 
(LACER); Child Poverty Group. 
5.0 CONCLUSION
5.1 This review fulfils the obligation, from The Child Poverty (Scotland) Act 2017,
for local authorities and health boards to deliver jointly an annual review of their Child
Poverty Action Plan.  Links with other local authority reporting duties on tackling child
poverty include: Fairer Scotland Duty, Islands (Scotland) Act 2018; Children and
Young People (Scotland) Act 2014; Education Act 2016; Community Empowerment
(Scotland) Act 2015.
This Child Poverty Action Plan links to: the Local Outcome Improvement Plan,
Children and Young People’s Services Plan and the Children’s Rights Plan. 
Overarching this, children’s rights and tackling child poverty should be a consideration
in every Council plan and strategy.    
5.2 The current Child Poverty Action Plan Review 2020 – 2021 sets out the current
situation in terms of child poverty in Argyll and Bute and makes particular reference to
areas such as children’s rights, sustainability and the challenges facing our island
communities. The plan sets out work that has been happening to address child poverty
in Argyll and Bute and some Page 5 4 plans for actions going forward. This will be led
by Fiona Davies and the CPAG group; training, engagement and data analysis are
key issues for the coming year. 
6.0 IMPLICATIONS
6.1 Policy  - none
6.2 Financial  - The report notes a forecast financial impact on families and
well being and may risk a subsequent financial impact on organisations as the
wider  and longer term impacts of poverty are felt.
6.3  Legal  - none
Page 296

Page 297

6.4  HR - none 
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics An EQSEIA and a CRWIA have
been carried out in relation to this Child Poverty Action Plan Review.  No
negative impacts were noted and positive impacts seen in terms of the work
noted in this review.   
6.5.2   Socio-economic Duty 
6.5.3  Islands - Fuel poverty by ward is provided in appendix 2. 
6.6 Climate Change - none 
6.7 Risk – The reviewed plan shows a range of planned work to address child
poverty; it is noted that the latest child poverty figures for Argyll and Bute show a
reduction of 1.8% to 18.9% (below 60% median income after housing costs).  However
recent events such as the impacts of EU Exit, the war in Ukraine and the cost of living
crisis have placed more families into financial crisis and made it less likely that the
Scottish Government’s child poverty reduction targets for 2023 and 2030 will be met.      
6.8  Customer Service - none 
Fiona Davies
Executive Director with responsibility for Argyll & Bute HSCP
Policy Lead Councillor Amanda Hampsey
30 August 2022                                                  
For further information contact: Mandy Sheridan 
mandy.sheridan@argyll-bute.gov.uk 
APPENDICES
Appendix 1 Child Poverty Annual Review 2021-22
Appendix 2 Fuel Poverty by ward March 2022.   
Page 297

Page 298

This page is intentionally left blank

Page 299

1 
Argyll & Bute Child Poverty Action Plan Review 2021-2022  
Argyll and Bute 
Child Poverty
Action Plan
Review
2021-22
August 2022
Page 299

Page 300

2 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Contents
Foreword ................................................................................................................................................................................ 3
Introduction ........................................................................................................................................................................... 5
Our Vision......................................................................................................................................................................... 6
Latest Child Poverty Figures .................................................................................................................................. 6
Reasons for this Child Poverty Review ............................................................................................................ 7
Children’s Rights.........................................................................................................................................................10
The Promise ..................................................................................................................................................................12
Our Challenge ..............................................................................................................................................................14
Population and Employment ................................................................................................................................15
Greener Development and Sustainability ......................................................................................................17
Training ............................................................................................................................................................................18
Key Areas of the Plan: ..................................................................................................................................................21
A. Increasing Income from Employment and Earnings ..........................................................................21
B. Increasing Income through Benefits...........................................................................................................38
C. Cost of Living..........................................................................................................................................................41
D. Helping Families in Other Ways ...................................................................................................................60
E. Other Planned Work ...........................................................................................................................................67 
Page 300

Page 301

3 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Foreword 
Welcome to the third annual review of Argyll and Bute’s Child Poverty Action Plan.  It
has been a year that has brought fresh challenges for us all with food shortages, a
cost of living crisis and the war in Ukraine creating concern for us all.  Not surprisingly
some of our children and young people are experiencing anxiety and our Teachers,
Educational Psychologists and School Counsellors are working with parents to support
them.   
Despite these challenges we remain committed to ending child poverty because we
recognise just how important that goal is to creating a just society and, as Nelson
Mandela said: A winner is a dreamer who never gives up. 
We are happy to be able to report that we have had some important wins this year. 
We recognised that training our staff to understand poverty and to be able to better
work with and support those experiencing it, was important.  Working with The Poverty
Alliance, One Parent Families Scotland and The Child Poverty Alliance we put
together a broad range of training events for our multi-agency staff group and others. 
Some 220 professionals and our elected members received poverty awareness
training and we were impressed by the insights that participants shared with us.  Other
courses ran on topics such as Single Parent Poverty Awareness; Benefit Basics in
Scotland; Payments for Children in Scotland and Supporting Low-Income families. 
Other wins come with our commitment to #KeepingThePromise and our continued
development of a trauma informed workforce.  Adding to this is our commitment to
train staff in Dyadic Developmental Psychotherapy and over 50 staff have completed
DDP level 1 training and our first cohort have commenced DDP level 2 training.  This
will support our commitment to dealing not only with the drivers of poverty but also the
impacts of it and other traumas.   
The axiom, “knowledge is power” is relevant when it comes to tackling child poverty
and this year our advice services have worked tirelessly to get people the information
they need to claim their rights and benefits.  This has resulted in the client gain of
£10,165,000, a remarkable win for our families.  This work has been supported by
Money Counts training and the wide circulation of the Food Aid Network (IFAN) Argyll
and Bute Worrying about Money? Leaflet. 
Knowledge also plays a key part in our engagement with our children and young
people and a child friendly version of this report will be shared.  Engagement is
happening in schools, some young people have become Poverty Champions and a
few attended the Poverty Awareness Training.  Awareness of children’s rights go hand
in hand with tackling child poverty and this year saw Hermitage Academy in
Helensburgh become the first secondary school in Argyll and Bute to receive gold
accreditation in UNICEF UK’s Rights Respecting School programme.   
From free school meals and addressing holiday hunger, to setting up school clothing
banks.  From the success of our Flexible Food Fund, to the amazing work of ALIenergy
in helping people dealing with fuel poverty.  From employability actions, to the rural
growth deal and successful bids to the UK Community Renewal Fund.  We would like
Page 301

Page 302

4 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
to take this opportunity to thank everyone involved for their hard work and commitment
and to recommend this report to you.   
Fiona Davies
Chief Officer Argyll & Bute
Health and Social Care
Partnership, Chair,
Strategic Children’s
Group 
Pippa Milne
Chief Executive Officer
Argyll & Bute Council 
Pam Dudek
Chief Executive Officer
NHS Highland 
Page 302

Page 303

5 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Introduction 
Welcome to the third review of the Argyll and Bute’s Child Poverty Action Plan, 2021-
2022.  Although this year has brought challenges we have continued to move forward
with our objective to work to reduce child poverty and its impacts across Argyll and
Bute.  The year has been marked for us by the delivery of a large number of training
events for staff, relating to tackling and understanding poverty.  Our Flexible Food
Fund has continued to benefit families and there has been positive progress in areas
such as employability, free school meals and holiday hunger, housing, client gain
figures and engagement.  Our multi-agency Child Poverty Action Group remains
committed to tackling child poverty and the impact that it has on young lives.  This year
the group has acquired the services of a Project Assistant to support this work.     
Nationally there has been the publication of the Scottish Government’s second
Tackling Child Poverty Delivery Plan, “Best Start, Bright Futures 2022-2026” This
makes a commitment to supporting families through all the challenges raised by the
cost of living crisis, war in Europe and other events. Importantly it also states that: 
The 2030 targets require us to work differently – placing an ever greater focus on
families and the places they live. Through phased approaches to change, working in
a small number of localities, we can identify the barriers to progress and the keys to
removing these for families and partners.       
In Argyll and Bute we welcome this approach as it recognises the challenges for
families living in remote, rural and island places and acknowledges that solutions to
child poverty must take into account the geography and key demographics of different
areas.  A young person living in a family on benefits on an island, attending school on
the mainland and living in a School Hostel, has a very different experience to a young
person living in a city in the central belt.  Factors such as transport, supply issues in
food chains and the need to travel to access some activities and medical appointments
become key and will influence how far benefits will stretch and what money must be
spent on.   
The bottom line is that it is expensive to live in remote, rural and island places.  
As part of this we recognise that fuel poverty is a significant issue in Argyll and Bute
but is not equally distributed throughout the region. For example Bute has 41-50% of
its population in fuel poverty whereas Cowal has less than 20%. Fuel poverty hot spots
are in the islands, Kintyre, Oban and Lorn. Our area has one of the highest fuel poverty
rates in Europe with some areas paying more for gas delivery due to their remote
status. Many areas have no access to mains gas so have no alternative to using more
expensive alternatives. The impact on families can be severe, as Lynda Mitchell,
Manager of ALIenergy says: 
“The perceived image of fuel poverty is often an elderly person sitting with a blanket
by the fire, but advisors have found that many clients are much younger, often families
with children. As people switch their heating down or off to save money, fuel poverty
manifests in a range of different behaviours, including seeking warmth in public places
where it’s free – for example, taking the free bus for a round trip because it's warm, or
lingering in pubs, cafes, libraries, and other public places, to avoid being at home
(particularly challenging during the pandemic). Other problems include not being able
Page 303

Page 304

6 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
to cook hot meals; not being able to wash or do laundry frequently enough for
adequate personal hygiene; staying in bed for prolonged periods, living in one room,
and being embarrassed to invite friends or neighbours into the home, leading to issues
of loneliness, social isolation and reclusive behaviours.” 
Poverty matters because there is increasing evidence to show that there are
connections between poverty and issues such as: higher infant mortality rates, poor
physical and mental health, family stress levels and breakdown, children becoming
care experienced, poor educational, employment and social outcomes and drug and
alcohol use.  Domestic abuse can be impacted on by the stresses and financial
hardships of poverty and this can lead to the break-up of families.  Poverty can make
people feel socially excluded, invisible and unsupported; all factors that can contribute
to poor mental health and suicide.  It must be asked what the cost economically to the
country is of all of these factors and their impact on both services and the productivity
of our workforce?  If these impacts could be improved or eliminated by simply putting
more money into people’s pockets through improving benefits and providing a living
wage, would the cost in fact be less?  Whatever the answer to that question is, we
remain committed to making what difference we can and our vision remains: 
Our Vision 
We want an Argyll and Bute where no-one lives in poverty. Everyone should be able
to achieve their potential and feel healthy, happy and valued. We want to be a place
where everyone understands that tackling poverty is a shared responsibility. We
believe that if we act locally, and in partnership, we can make a difference. 
Latest Child Poverty Figures 
On the 12th of July 2022 the End Child Poverty coalition published the latest local child
poverty figures.  Their research, covering the period to 2020/21, provides the best
available estimates of child poverty at local authority level (below 60% median income
after housing costs).  Figures for Argyll and Bute are as follows: 
Date Number of
Children in
Poverty
Percentage of
Children in Poverty
Percentage
Point Change
2014 - 2015 2808 20.7% 
2020 - 2021 2325 18.9% -1.8% 
This positive change reflects the Scottish Government investment in the new Scottish
child payment, other Social Security payments and a range of other measures.  It also
reflects the impact of a range of local measures taken to tackle child poverty and its
impacts, which are noted in this report. 
Such positive changes, seen in 26 of Scotland’s 32 local authority areas, demonstrate
that taking action can make a difference.  Scotland has the lowest rate of child poverty
amongst countries of the UK at 21%, followed by England at 29% and Wales at 34%.   
Page 304

Page 305

7 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Reasons for this Child Poverty Review 
In 2017 the Child Poverty (Scotland) Act came into force as an attempt to put in place
measures that would reduce the concerning increase in child poverty, both on a
national and local level. To evidence the need for such action the Scottish Government
commissioned research which found that by 2030/31, if no action was taken, it was
estimated that 38% of children would be in relative poverty, 32% of children would be
in absolute poverty, 17% of children would be in combined low income and material
deprivation and 16% of children would be in persistent poverty. 
The 2017 Act set four targets relating to ending child poverty, which the Scottish
Government committed to trying to achieve by 2023 and 2030; these are all measured
after housing costs are deducted.  The targets for 2023 are: 
• Less than 18% of children are in relative poverty;
• Less than 14% of children are in absolute poverty;
• Less than 8% of children are in combined low income and material deprivation;
• Less than 8% of children are in persistent poverty.      
Targets for 2030 are: 
• less than 10% of children live in relative poverty (relative poverty is less than 60%
of average household income for the year taking account of the size and
composition of the household);
• less than 5% of children live in absolute poverty (absolute poverty is less than 60%
of average household income for the financial year beginning 1 April 2010);
• less than 5% of children live in combined low income and material deprivation (low
income is defined as less than 70% of average household income for the year,
material deprivation is when families are unable to afford three or more items out
of a list of basic necessities);
• less than 5% of children live in persistent poverty (persistent poverty is where a
child has lived in relative poverty for three out of the last four years). 
With the cost of living crisis set to deepen and the World Bank suggesting that it might
continue for several years, it must be acknowledged that it will be very difficult to meet
the interim and final targets set by the Scottish Government with regards to tackling
child poverty.  However recent child poverty figures suggest that it is not impossible.  
As the Nuffield Foundation noted: 
Inequalities are not inevitable, and some policies and interventions have led to
improvements in young children’s health. The Scottish national infant feeding strategy
has led to increased rates of breastfeeding. Sure Start led to major health benefits for
children from poorer neighbourhoods. National oral health programmes in Scotland
and Wales have accelerated rates of improvement in children’s oral health. The
success of these interventions demonstrates that improvements in young children’s
health are possible with sustained policy effort. 
The Nuffield Foundation; Carey Oppenheim, Richard Batcheler, Dr Dougal
Hargreaves, Jordan Rehill, Dr Rakhee Shah
Page 305

Page 306

8 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
This review is also where we in Argyll and Bute show what actions we are taking to
tackle child poverty and how well we work together to achieve our vision of no children
living in households affected by poverty and depravation.  We believe it is important
to understand that tackling child poverty is more than just reaching targets because: 
Poverty is not only experienced materially and socially, but also emotionally. Financial
stress, not having an adequate income or work, reverberates through family life…..
Poverty influences child outcomes indirectly where lack of income and economic
pressure can lead to psychological distress, lack of control and choice, and the
experience of stigma, all of which can in turn affect relationships within the family both
between parents and parenting practices. 
Changing Patterns of Poverty in Early Childhood; Nuffield Foundation; Sept 2021 
Pupil Voice on Childhood Poverty 
It can be difficult to talk to younger children about child poverty and to get them to
share how they feel about the World about them. Some of our Schools have tried to
achieve that in a non-threatening and engaging manner.  These results give us insight
into their World, a place where some of them will be experiencing the impacts of child
poverty.   
Group 1 (8 – 12 years-old) 
What makes you happy My friends
Pets
Food
Family
Nintendo Switch with my mum
Throwing snow balls
Edinburgh Zoo
Sun
Young carers
School erm 50 50 (school program)
What do you see around you Houses
Cars
Other people
Snacks 
What do you hear around
you
Friends
People talking
Shouting
Cars 
What do you talk about Music
Friends
Not much 
Page 306

Page 307

9 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
What do you worry about Dad might lose his job
Might need to move and leave friends
What do you enjoy doing Arts and crafts
Skating
Going to the beach
making jewellery
bowling
painting
making puppets
clay art
holidays
friends
play parks
adventures
climbing trees
going for walks
What do you hope to gain Get a dog
Move to New Zealand
I want to be an interior designer
I want to go to Art school in Edinburgh
I want to be a make-up artist
I don’t know 
Group 5 – (11years-old) 
What do you enjoy doing? Maths
Swimming
Singing
Painting
Dancing
Telling jokes
Football
Spending time with family
What do you see around
you?
children in same situation as me
friends
the sun
British flag (hall was decorated for Jubilee)
What do you hear around
you?
birds
voices
noises
echo's
What do you worry about? spiders
deforestation
phobia of holes
something bad happening
my mum and dad
What makes you happy? my mum
family
football
friends
Page 307

Page 308

10 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
life
What do you hope to gain? get better at football
get a job when I'm older
become a dinosaur expert
become a nurse 
Group discussion (5 – 11 year-olds) 
How does Child Poverty
impact me?
it doesn't as I am warm and loved and that's all I
need
I feel bad for others and donate to foodbanks
What does Child Poverty
look like for you?
My Mum works really hard because I think she
worries about money
What would Child Poverty
feel like?
sad, cold, jealous of others, stressed, lonely,
hungry, embarrassed, heartbroken, upset, angry 
Children’s Rights 
The UN Convention on the Rights of the Child (UNCRC) is one of the core international
human rights treaties and is a universally agreed set of minimum child rights standards
which is the most widely ratified of all the international conventions.  Importantly the
UNCRC introduces the concept of a child’s ‘evolving capacities’ (Article 5), which
states that direction and guidance provided by parents or others with responsibility for
the child must take into account the capacities of the child to exercise rights on their
own behalf. It includes four general principles that are not only rights in themselves
but underpin every other right in the Convention: 
 For rights to be applied without discrimination (Article 2) 6 
 For the best interests of the child to be a primary consideration (Article 3) 
 The right to life, survival and development (Article 6) 
 The right to express a view and have that view given due weight (Article 12) 
The UNCRC provides children with a series of individual rights, such as the right to
education, health, name, nationality, play and an adequate standard of living.
Additional rights have been included for particular groups, including disabled children,
children who have been exploited or mistreated, refugee and migrant children, children
in custody and children in care. Children’s rights are inextricably linked with the rights
of parents and carers, whose important role in children’s lives is recognised
throughout. 
Children’s rights are fundamental to all work tackling child poverty and should be
reflected in the principles and objectives of all services that support children.  This
means not only direct services such as education, health and social care but also our
political, social and economic infrastructures.  When we look at a Strategic Children
and Young People’s Service Plan from A Health and Social Care Partnerships (HSCP)
we expect to see needs and children’s rights identified and considered.  Local
Authorities also need to show that is happening, for example, when a road is planned,
street lighting changed or a Commissioning Strategy developed.  
Page 308

Page 309

11 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Argyll and Bute is committed to achieving that and to completing Equality and Socio-
Economic Impact Assessments when considering new work, policies and strategies.
This document incorporates the principles of Child Rights and Wellbeing Impact
Assessments.      
In 2020 Argyll and Bute completed its first Children’s Rights Report, setting out our
commitment to embedding the UNCRC into policy and practice and demonstrating
how children’s rights are respected across our services.  Since that time we have set
up a multi-agency Children’s Rights Group to forward that and ensure partnership
working. The work of this group has included the development of an e-learning module
for staff on Child Poverty and Children’s Rights.   
Link to Argyll and Bute’s Children’s Rights Report: 
https://www.argyll-
bute.gov.uk/sites/default/files/childrens_rights_report_2020_final.pdf 
Another success in terms of children’s rights work in Argyll and Bute has been the roll
out of the Rights Respecting Programme across schools.  UNICEF UK works with
schools across the country to embed children’s rights in a schools’ ethos, raise
awareness of the United Nations Convention on the Rights of the Child (UNCRC) and
to increase understanding of children's rights. 
Hermitage Academy in Helensburgh has become the first secondary school in Argyll
and Bute to receive gold accreditation in UNICEF UK’s Rights Respecting School
programme.  Hermitage Academy is the second school in Argyll and Bute to receive
gold accreditation – the first being Hermitage Primary in 2020.
Link to Argyll and Bute’s Children’s Rights Report: 
https://www.argyll-
bute.gov.uk/sites/default/files/childrens_rights_report_2020_final.pdf 
Link to Links to Argyll and Bute’s Child Poverty Action Report 2019
https://www.argyll-bute.gov.uk/sites/default/files/child_poverty_action_plan_0.pdf 
Scot Gov.: The UN Convention on the Rights of the Child: a guide for children and
young people
The UN Convention on the Rights of the Child: a guide for children and young people
- gov.scot (www.gov.scot) 
Page 309

Page 310

12 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
The Promise 
A key consideration when looking at our work on tackling child poverty in Argyll and
Bute must be keeping The Promise.   The Promise, launched by the Scottish
Government in Autumn 2020 originates in the findings of The Care Review and makes
a commitment to care experienced infants, children, young people, adults and families,
that  every child grows up loved, safe and respected, able to realise their full potential. 
It demands a multi-agency approach to support shifts in policy, practice and culture
across Scotland and make the difference that is required.  In Argyll and Bute a strong,
multi-agency commitment has been made to delivering on The Promise and that work
has continued, despite the considerable barriers raised by the Covid-19 pandemic, EU
exit and the current cost of living crisis.   
The Scottish Government is committed to Plan 21-24, this states that:
Every child that is ‘in care’ in Scotland will have access to intensive support that
ensures their educational and health needs are fully met. 
Local Authorities and Health Boards will take active responsibility towards care
experienced children and young people, whatever their setting of care, so they have
what they need to thrive. 
There are clear links between The Promise and tackling child poverty at a local and a
national level.   It states that there must be a significant, ongoing and persistent
commitment to ending poverty and mitigating its impacts for Scotland’s children,
families and communities.  With both areas of work support for families within a whole
family approach is emphasised, as is the need for organisations and communities to
accept that creating real and sustainable change is everyone’s responsibility.  Also
shared is the recognition of the impact of disadvantaged and stressful living conditions
and how they can interact to cause outcomes where poverty can lead to children
becoming care experienced and families requiring wraparound support. 
In all of this the importance of children’s voices being heard is central and must be
made a part of decision making and a process of listening to their needs and
aspirations.  Argyll and Bute HSCP makes this a central tenant of all their work and is
committed to the recognition of the importance of Article 12 which states: 
Parties shall assure to the child who is capable of forming his or her own views the
right to express those views freely in all matters affecting the child, the views of the
child being given due weight in accordance with the age and maturity of the child. For
this purpose, the child shall in particular be provided the opportunity to be heard in any
judicial and administrative proceedings affecting the child, either directly, or through a
representative or an appropriate body, in a manner consistent with the procedural
rules of national law 
The United Nations Convention on the Rights of the Child; UN
20/11/89. 
Page 310

Page 311

13 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Argyll and Bute Council and the HSCP have made a commitment to tackling child
poverty through delivering on The Promise and is working to ensure that this is
reflected throughout its strategies policies and plans.  It is recognised that the
geography and the remote and rural nature of many small communities creates
significant challenges in ensuring equality of services but there is a commitment to
ensuring that happens. It is also recognised that this is a journey and that there will be
more to accomplish along the way but some of the key developments over the last two
years have included: 
Argyll and Bute has been a national Pilot area for the delivery of trauma training and,
to date, in excess of 95% of education and residential care workforce have undertaken
Trauma Training, either on line self-learning or delivered training. This training is
across the whole workforce, including those responsible for the care and support of
care experienced children and care leavers. 
The Bute and Cowal test site is exploring a model for intensive whole family support
for children on the edge of care, in particular where parental substance misuse or poor
mental health are key factors. 
Over 50 staff have completed DDP (Dyadic Developmental Psychotherapy) level 1
training and our first cohort have commenced DDP level 2 training. 
“Together Apart” assessment training has been implemented for social workers
supporting brothers and sisters and permanence planning guidance has been revised
to ensure greater weight is given to maintaining relationships. 
Restraints or “safe holds” have not been used in any of the three children’s residential
houses for over 5 years. Staff have been trained in therapeutic crisis intervention which
has contributed to no longer using these interventions. 
Who Cares? Scotland provides a widely understood relationship based advocacy
service for all care experienced children. 
Parents affected by poor mental health or with learning difficulties have good access
to independent advocacy through Lomond and Argyll Advocacy Services.
There are plans to review advocacy services for parents with care experienced
children. 
All foster carers have been offered trauma informed PACE training. 
A Principal Teacher for Care Experienced Children and Young People has been
appointed to lead on improving educational outcomes to oversee their education. 
There has been an appointment of Health and Wellbeing Liaison officers in each local
area to provide intensive support for care experienced children and their families. 
The implementation of a Care Experienced CAMHS service has been commenced.
A Health Manager with specific responsibility for care experienced children has been
appointed. 
Page 311

Page 312

14 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
50% of schools have signed up for the Rights Respecting Schools Approach and are
following the framework for awards and 26% of schools are involved in Argyll and
Bute’s Local Authority Nurture Strategy programme. 
There is a long established multi agency approach to early and effective intervention
with young people to avoid criminalisation and target effective early help. 
All care experienced young people leaving care are entitled to maximum points and
prioritised for allocation, housing and social work plan together to ensure that housing
options are consistent with a young person’s identified needs. 
Our Challenge 
There is currently a higher percentage of children in low income families in Argyll and
Bute than the Scottish national average.  It is difficult to assess why this is the case
but the difference in wage levels between Argyll and Bute and the Scottish average
coupled with the higher costs of remote, rural and island living will be factors.  It is also
likely that the effects of the pandemic on our key employment areas, exacerbated by
EU exit and the war in Ukraine, are important.  The current cost of living crisis is being
particularly felt in Argyll and Bute due to the high cost of fuel.  The Council, ALIenergy
and other organisations are employing a range of measure to combat fuel poverty and
improve the condition of existing housing stock.             
Children in Low Income Families     
Argyll and Bute                       Scotland
2017 - 2018                                 17.3%                                18.6%
2018 - 2019                                 16.7%                                16.5%
2019 - 2020                                 17.2%                                16.8%
Households on Universal Credit - November 2021 
Page 312

Page 313

15 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Total paid from Scottish Welfare Fund (Crisis Grants & Community Care Grants
combined): 
2018 - 2019                       £443,243
2019 - 2020                       £435,112
2020 - 2021                       £641,017 
Numbers in Receipt of Council Tax Reduction
Council Tax Reduction Caseload 01/04/2021              6,531
Council Tax Reduction Caseload 2/03/2022                6,930 
Population and Employment 
Argyll and Bute is a geographically large and diverse area and is the second largest
local authority in Scotland at 690, 899 hectares. It is also the third most sparsely
populated area with only 13 people per square kilometre or 0.13 per hectare compared
to the Scottish average of 0.70 (Mid-Year 2017 Population Estimates. It covers almost
9% of the total Scottish land area (Census 2011). The area’s population of 85,870 live
within an area stretching from Helensburgh and Dunoon along the Clyde, Loch
Lomond to the East, the Mull of Kintyre to the south, Atlantic Islands to the west, and
the Sound of Mull and Appin to the north. Nearly half of Argyll and Bute’s population
(48.4%) live in areas classified by the Scottish Government as ‘rural’ while 17% live
on islands. 80% of Argyll and Bute’s population live within 1km of the coast. Argyll and
Bute has 23 inhabited islands (Census 2011), more than any other local authority in
Scotland. 
The spread of population brings challenges in terms of infrastructure, services and
providing employment.  There is an aging population and this causes difficulties in
terms of creating, attracting and retaining both employment and employees.  Further
the nature of the tourist industry (a major employer) means that it is difficult to source
housing for people already in the area and those wanting to come and work.  Providing
good transport links and the right employability skills and qualifications are key to both
meeting that need, encouraging new employers to the area and supporting existing
ones.     
Population 
Total population (2020)                            
Scotland 
Argyll and Bute                                   
Male 2,665,200 42,700                                            
Female 2,800,800 42,700                                            
Totals 5,466,000 85,400                                           
Page 313

Page 314

16 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Population aged 16-64 (2020)                                                               
AB Numbers          AB %               Scotland %
All People Aged 16-64                         50,500                    59.1             63.9
Males Aged 16-64                                25,900                    60.6               64.5
Females Aged 16-64                            24,600                    57.6                 63.3 
The nature and level of income through employment is a key driver of poverty.  In
Argyll and Bute we have a very limited industrial base and our main employing areas
are: tourism and the service sector.  The percentage of people employed in low income
sectors in Argyll and Bute has changed little in the last 5 years, from 32% in 2017 to
32.5% in 2020 (Annual Population Survey).  Over 87% of employee jobs in the area
are provided within the service sector, public administration, education, health, forestry
and fisheries, food and defence. 
Employment and unemployment (Jul 2020-Jun 2021) 
AB Number                      AB %             Scotland %
Economically Active                    39,700                             77.6                       75.9    
In Employment                            39,000                             76.2                       72.2
Employees                                   31,400                             63.1                       64.3
Self Employed                               7,500                              13.1                        7.6
Unemployed                                  1,500                                3.7                        4.7           
Whilst a higher percentage of people in Argyll and Bute are employed or self-employed
than the Scottish average, wages are lower and it is more common for people to have
more than one job, work part-time or be on zero hours contracts.   
There is a lower percentage of workless households in Argyll and Bute than the
Scottish average, 14.7% compared to 18.1% (Dec-Jan2020).   
Lower wages, combined with the gender pay gap in Argyll and Bute, make it more
difficult for women and single parent families led by a woman, financially.   
Average Earnings by place of residence (2020) 
AB (Pounds)                      Scotland (Pounds)
Gross Weekly Pay                                                              
Full-Time Workers                          553.6     595
Male Full-Time Workers                 606.7                                626.3
Female Full-Time Workers             477.1                                  562.5 
Hourly Pay - Excluding Overtime
Full-Time Workers                         14.64                                    15.63
Male Full-Time Workers                15.60                                        15.87
Female Full-Time Workers            13.54                                         15.31 
Page 314

Page 315

17 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Median Weekly Earnings (Residence-Based, Full-time) 
2018  £483.4    
2019  £528.4  
2020  £555.6  
2021  £562.7 
Gender Pay Gap in Argyll and Bute 
Argyll and Bute - Ranked 12 in table of local authorities
Men earn 13.6% more than women. 
Greener Development and Sustainability 
We are committed to creating green jobs and businesses within a low carbon economy
and giving young people the skills they need to become involved in this work.
Examples of this include successful projects put forward to the UK Community
Renewal Fund by Argyll and Bute, including the West Coast UAV Innovation Logistics
and Training Hub, and Curriculum Development for STEM Hub Projects.  
Also, being considered under the Scottish Government’s Islands Programme (IP); is
the Island Community Hall Connectivity Project – which would enhance digital
connectivity to allow access to superfast broadband. Community Halls and Centres
would operate a new hybrid-meeting model and act as community digital hubs. 
Another example, being developed as part of the Rural Growth Deal, is creating a Low
Carbon Economy.  This includes exploring  options for the decarbonisation of Islay
using a ‘whole systems’ approach that will consider power, heat and transport as well
as placing the needs of the individual and business consumer at its centre to ensure
that future energy systems are sustainable and support inclusive economic growth. 
In addition there are other areas of work, such as providing free period products,
developing school clothing banks and the Food Forum that offer an opportunity for
poverty actions and sustainability to be more closely aligned in a way that helps to
tackle stigma while enabling dignity and choice for those in need.         
Page 315

Page 316

18 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Training 
One of our commitments for the year 2021 – 2022 was to deliver training, related to
understanding and tackling child poverty, for a wide range of staff groups across Argyll
and Bute, including HSCP, Education and the Third Sector and Housing.  This was
made possible by monies from the Flexible Fund which enabled us to commission the
Poverty Alliance, Child Poverty Action Group and One Parent Scotland to work with
us.  A number of training packages were developed and delivered on multiple
occasions over a three month period.  It was also agreed that Poverty Awareness
Training would be delivered to Councillors following the May elections .Take up was
good across the board and it is hoped that we will be able to repeat some of this
training in 2023.     
Courses had different target groups and the intention was to have both practical and
consciousness raising outcomes.  For example the course Single Parent Poverty
Awareness was  aimed at all sector workers with an interest in understanding the
specific issues, misconceptions and barriers single parents face and why single
parents are uniquely placed in the poverty statistics. Also for managers who employ
single parents and may want to know more about potential barriers to work faced by
single parents and how they may single parent proof their practices.   
Poverty Awareness Training was delivered in partnership with Argyll and Bute
Council by a consortium formed of the Poverty Alliance (PA), One Parent Families
Scotland (OPFS) the Child Poverty Action Group in Scotland (CPAG) to a total of 220
professionals, over 20 occasions, was rated valuable or very valuable by all 81
participants who completed evaluations and was most commonly described as
‘informative’.   
Not only was it perceived as very valuable / valuable by most participants but it enabled
us to see what a large number of staff identified as priorities for address poverty in
Argyle and Bute summarised as: 
• Investment in employment opportunities, transport, 
• Transport and access to public transport 
• Access to health care services 
• Access to childcare 
• Access to further education and support to young people 
• Access to affordable good quality housing   
Page 316

Page 317

19 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
One of the most positive things to come out of the training was the powerful messages
that staff took form it to carry forward into their professional and personal lives,
hopefully improving services for those experiencing poverty and deprivation. It was
noted that whilst a local member of the Scottish Youth Parliament attended as did two
local young Poverty Champions, it would have been better if more young people could
have attended.  It was also noted that most participants were female and the course
could have been more balanced on gender.     
Page 317

Page 318

20 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Other Courses:
There were also a number of courses for those who worked directly with families and
needed to know how best to help them in areas such as Social Security and other
benefits; how to make sure that people are claiming their full entitlement.  These
courses were well subscribed and received positive feedback; they included: 
• Benefit Basics in Scotland
• Payments for Children in Scotland
• Supporting Low-income Families
• Scottish Social Security – an Introduction 
COURSE DATE
Single Parent Poverty Awareness  January to March 2022
Benefit basics in Scotland 12 – 13 January 2022
Payments for children in Scotland 18 January 2022 
22 March 2022
Supporting low-income families 25 January 2022 
18 / 23 February 2022 
2 / 14 / 30 March 2022
Scottish social security – an
introduction
9 March 2022 
24 March 2022 
Poverty Awareness Training  January to March 2022 
In addition to the commissioned training events there has been the delivery of Money
Counts Training.  The Money Counts Level 1 awareness session was co-developed
by the Highland Money Counts Partnership including the Trussell Trust, NHS
Highland, Highland Council and Social Security Scotland, in partnership with the
Independent Food Aid Network and Nourish Scotland.  It is has been adapted for Argyll
and Bute and is currently delivered by Heather McAdam from NHS Highland and Mags
Todd from A&B Council. 
The sessions aimed to:
• Increase understanding of poverty and its impact;
• Increase confidence to ask about money worries;
• Increase knowledge of support services for money matters. 
The sessions also raised awareness of the Independent Food Aid Network (IFAN)
Argyll and Bute Worrying about money? Leaflet and encouraged participants to use
this when discussing money issues with clients. These sessions are still taking place.  
Considerable efforts have been made by a raft of organisations and departments to
ensure that every household in Argyll and Bute receives the IFAN Leaflet and this has
included sending it out with Council Tax bills and making it available via Council and
other media sites, Community Groups, Living Well Networks and Food Banks.   
Page 318

Page 319

21 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Key Areas of the Plan: 
A. Increasing Income from Employment and Earnings
1. Employability 
Delivery of the Parental Employability Support Fund (PESF) continues within the
broader context of the No One Left Behind policy direction. https://www.argyll-
bute.gov.uk/forms/contact-employability-team
Eligible participants must have the right to live and work in the UK and are: 
• Lone Parents who are unemployed or experiencing in work poverty 
Page 319

Page 320

22 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
• Parents with a disability or families who are unemployed or experiencing in work
poverty and have a disabled child 
• Parents who are unemployed or experiencing in work poverty and have 3 or
more children
• Parents from a minority ethnic background who are unemployed or
experiencing in work poverty 
• Parents who are unemployed or experiencing in work poverty and have a
youngest child
• Parents who are aged <25 who are unemployed or experiencing in work poverty 
The main objectives/expected outcomes are to support the delivery of the Scottish
Government’s Parental Employability Support Fund (PESF) to deliver a flexible and
17 user-based model of employability support for the parental groups identified in
Every Child, Every Chance: tackling child poverty delivery plan 2018-2022, through
appropriate support focusing on intensive key worker support. 
With effect from May 2022 the PESF Employer Recruitment Incentive (ERI)
programme is also offered by Argyll and Bute Council.  ERIs play an important role in
supporting those with the greatest barriers to employment, to enable them to obtain
and remain in sustainable employment. 
The ERI is available to use as a contribution to the additional costs of recruiting and
sustaining eligible participants in employment. The ERI can be utilised in several ways
such as for additional supervisory costs, training, initial travel to work costs, specialist
in work support, or wages. 
Up to £6,000 per participant is available, this allows employers to offer unemployed
parents the opportunity to move into permanent or a fixed term employment contracts
of up to 18 months or more. 
Fair Start Scotland (FSS) is currently being delivered by Argyll and Bute Council’s
Employability Team on behalf of People Plus. 
https://www.argyll-bute.gov.uk/forms/contact-employability-team 
To be eligible participants must be:
• Living in Scotland and eligible to work in the United Kingdom; 
• over 18 and out of work; or 
• 16 or 17 and are either disabled or in receipt of Employment and Support
Allowance or Universal Credit 
This service is targeted at those who wish to receive individually tailored support to
find and remain in employment or self-employment. 
The Young Person’s Guarantee also offers Employer Recruitment Incentives
(ERIs) of up to £6,000 per participant.  This allows unemployed young parents aged
16 to 24 years the opportunity to move into permanent or a fixed term employment
contracts of up to 18 months or more. 
https://www.argyll-bute.gov.uk/helping-people-work
Page 320

Page 321

23 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Young people (including graduates) entitled to receive support through the YPG
Employer Recruitment Incentive (ERI) are those who: 
• Have the right to live and work in the UK
• Are currently resident in Argyll and Bute
• Are unemployed (or on a paid work experience programme such as Kickstart
and Community Jobs Scotland) 
and meet one or more of the following criteria: 
• Disabled and/or deaf person (includes those experiencing mental health issues
and those who have an impairment or long-term health condition) 
• Care experienced young people 
• Primary Carer 
• Person with a conviction (including Criminal Protective Orders) 
• No or limited work experience 
• Early leavers from the armed forces, veterans, and ex-forces personnel
• Long-term unemployed (6 months or over) who are not on Community Work
Placements 
• Person who has failed their ESA Work Capability Assessment 
• People from Ethnic Minority backgrounds and racial groups, with a targeted
approach informed by local population data.
• Gypsy/travelling community 
• Partner of current or ex-Armed Forces personnel 
• Person requiring support with language, literacy, or numeracy, including those
for whom English is an additional language 
• Lone parent 
• Low skilled
• A young person who was receiving additional support for learning in school
• Refugee or other granted leave to stay in the UK 
• Homeless person (including temporary or unstable accommodation)
• Person affected by substance misuse. 
The No One Left Behind also offers Employer Recruitment Incentives (ERIs) of
up to £6,000 per participant.  This allows unemployed participants aged 25 to 67 years
the opportunity to move into permanent or a fixed term employment contracts of up
to 18 months or more. 
https://www.argyll-bute.gov.uk/helping-people-work 
Participants entitled to receive support through the NOLB Employer Recruitment
Incentive (ERI) must: 
• Have the right to live and work in the UK
• Be aged between 25 and 67 years up to 67 years (Pensionable age) and
experiencing barriers to employment;
• Reside in Argyll and Bute
• Be unemployed and not participating in the Scottish Government’s Fair Start
Scotland programme. 
Page 321

Page 322

24 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Successes and Challenges 
Parental Employability Support Fund (PESF)
To date 47 parents across the 6 target group have signed up to receive support from
our two PESF Engagement Workers, of these parents: 
32 (68%) were unemployed and 11 (32%) low income employed on commencing
support.
9 of the 32 unemployed have now ceased support. All 9 are in a positive destination,
8 in employment (89%) and 1 has moved into full time education (11%).
2 of the 11 employed have now ceased support, 2 (100%) of these parents have
experienced an increase in their household income. 
Case Study – Employed Parent on Low Income 
Who – tell us about
the participant  A is a 30 year old mother of three children. She was a
self-referral to PESF and had become aware of our
service via one of Argyll and Bute Council’s Facebook
posts.  She was working part time as a Carer and hoped
to increase her household income. 
Barriers Identified A’s main barrier was the lack of affordable childcare for
her youngest child which was preventing her from taking
on any additional hours. During the completion of her
Initial Needs Assessment she expressed an interest in
starting up her own cleaning business.  She thought that
this would be a way for her to take on additional hours
whilst working around her children/childcare at the same
time.  
Impact – how has the
participant changed
or moved forward
that would not have
been the case
without the support
(training /learning
participation
progress made
including soft skills
and any milestones /
outcomes achieved). 
Her PESF Keyworker discussed various options and a
referral was put into the Business Gateway on her
behalf. 
Through the support of PESF and Business Gateway A
has now set up her own small cleaning business which
is going from strength to strength. She is taking on new
clients on a regular basis and due to her self-
employment she is able to work around her children thus
avoiding any further childcare costs. 
Her 3 year old has secured a place within one of our local
nursery settings. This will then enable her to take on
further additional hours.   
Her new business has made a significant difference to
her household income, which will increase further when
her youngest child starts nursery.
Page 322

Page 323

25 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Quote from
participant – their
views on the support
offered and outcome
achieved? 
“I am very grateful for the help and support I’ve received
from my PESF Key Worker.  Starting up my own
business was something I had thought about for a long
time but I didn’t know where to begin.  She was really
good at giving me all the information I needed and
referring me onto the Business Gateway team.  I am
thrilled to bits to say that I now run my own business, I
don’t have to pay any additional childcare costs and my
income has increased.  Thank you!” 
Case Study 2 – Unemployed Parent 
Who – tell us about
the participant 
B is a 32 year old single parent of 4 children.   She is
currently unemployed and was referred to the Parental
Employability Support Fund by the DWP.
Barriers Identified B’s main barrier to work is the lack of affordable childcare
in her local area. A secondary barrier was the fact that
she had only completed primary school education and
had left school with no qualifications.
In her Initial Needs Assessment she expressed an
interest in starting up her own nail technician business
as this was something that she really enjoyed doing as a
hobby for friends and family.  She thought that this would
be a way for her to find employment but work around her
children and childcare at the same time.
Impact – how has the
participant changed
or moved forward
that would not have
been the case
without the support
(training /learning
participation
progress made
including soft skills
and any milestones /
outcomes achieved). 
Her Engagement Worker discussed various options
however B was initially unsure about starting any type of
college course to help achieve her goals.  With the
support of her Engagement Worker she agreed to sign
up for an online nail technician diploma course where
she could work at her own pace and own time. 
When B started her online course it became apparent
that she would need training resources and materials to
help her to complete it.  PESF was able to purchase
these for her. 
To date B has passed every module and is really
enjoying the course.  She has also approached
hairdressers in her local area with a view to one of them
allowing her to rent out space to set up her own nail bar
in the near future.
Page 323

Page 324

26 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Quote from
participant – their
views on the support
offered and outcome
achieved? 
“The help and support that I have received from PESF
is fantastic.  After leaving school at 12 years old I never
dreamed that I would be able to complete any type of
further education course. The PESF workers have also
been amazing at helping me to purchase the materials
and resources that I needed to complete my course. 
Without their help I could never have afforded to
purchase these things.  I am getting a lot more help and
support than I expected, thank you” 
One major challenge has been recruiting staff to deliver PESF.  A lack of suitable
applicants resulted in non-appointment to the full time PESF Engagement Worker
advertised. 
Fair Start Scotland (FSS) 
Fair Start Scotland has gone very well in the last year.  Due to the pandemic delivery
has continued remotely resulting in increased engagement by the participants. 
Feedback received highlights this is a preferred delivery method for all current
participants.  Referrals from island communities have also increased.   
Over the last 12 months 77 new participants commenced individually tailored provision
FSS.  Keyworkers supported these participants as well as existing caseloads and
successfully moved a total of 39 into employment across a number of sectors. In work
support is offered to allow continuation of support whilst in employment. 
As this is a voluntary service the challenge continues to be competition from other
provision such as JETS, Kickstart, NOLB, PESF and the YPG.  Parents in particular
are opting for PESF, in the last year only one parent joined the FSS service. 
The Young Person’s Guarantee (YPG) 
The YPG has been well received in particular the 26 week waged opportunities
available January to September 2021. 
A total of 62 young people (15 island based) commenced subsided employment with
46 employers (8 island based). These opportunities exceeded the target of 60 by 2. 
Of the 62 young people, to date 48 (77.41%) have moved into a positive destination;
37 (59.67%) remaining in employment with the same employer, 9 (14.52%) moved to
work with another employer and 2 (3.22%) moved into further education. 
YPG Pre-employment Support delivered by Third Sector partner organisations,
supported 74 formal learning agreements for young people by the end of March 2022. 
The target was originally 60. 
YPG volunteering opportunities delivered by Third Sector partner organisations
supported 30 young people by the end of March 2022.  Of these 3 have left early or
Page 324

Page 325

27 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
completed; 2 (66%) have moved into employment and 1 has disengaged (33%).  The
remaining 27 young people are doing well and receiving support from a mentor based
on individual need. 
Modern Apprenticeships delivered by Argyll and Bute Council’s ‘Growing Our Own’
Team saw 4 young people commence employment. One young person has completed
his qualification and secured employment with another department, the remaining 3
are on track to complete.  Training providers are continuing to work well with the
apprentices. 
Kickstart 
Argyll and Bute Council is a Gateway Organisation for the UK Government’s Kickstart
Scheme for 25 employers and 50 placements further to approval from the DWP on
18th February 2021. It is hoped that the Young Person’s Guarantee will be used to
augment the support provided through the UK Government’s Kickstart Scheme by a
further six months. 
Update: Argyll and Bute Council acted as a Gateway Organisation for 32 employers
offering 66 work placements. Despite DWP’s best efforts just 38 work placements
were filled and the remaining places were either withdrawn due to lack of suitable
applicants or the employer decided not to proceed in the scheme. 
Partnership Action for Continuing Employment (PACE) 
Monies received to fund a Single Point of Contact and Engagement Worker for
employers and individuals across Argyll and Bute were not fully utilised due to a lack
of interest in the posts advertised. This is thought to be due to the short nature of the
contracts. Fortunately the tsunami of unemployment predicted due to the pandemic
did not materialise resulting in minimal PACE activity.  Following re-advertisement one
post was filled, 50% funded by PACE 50% No One Left Behind up until end March
2022.   
Plans Ahead 
To recruit an additional full time PESF Engagement Worker to allow additional
marketing of the service and increased engagement with parent target groups. 
To continue marketing of FSS service to encourage parents to sign up to receive
support should this be identified as the best option to suit individual needs. 
Phase 2 YPG continues with 90 Employer Recruitment Incentive places by end of
March 2023. To date 39 of these have been filled to include 10 Kickstart extensions.
Interest is increasing from employers who are keen to take advantage of the funding
on offer to recruit a young person. 
YPG Pre-employment Support for 2022-23 (partner delivery) has a target of 54
individuals, where 60% enter a positive destination. 
Page 325

Page 326

28 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Pre-employment Support, NOLB (aged 25+) (partner delivery) has a target of 42
individuals, where 60% enter a positive destination. 
Long Term Unemployment Intermediate Labour Market Support (aged 25+) focuses
on the delivery of a caseload of 28 (partner delivery), where 70% enter sustainable
employment by March 2023. 
ABEP improvement Action Plan completed and residual actions now incorporated into
the ABEP Delivery Plan, 2022-25 (working document) and submitted to the Scottish
Government. 
UK Shared Prosperity Funding Investment Plan, 2022-25 to be prepared by 1st August
2022. In-house employability provision to be incorporated under the people & skills
investment priority, as team reliant of external funding. 
Based on the No One Left Behind policy direction, focus has been given to
strengthening Local Employability Partnerships to take forward the No One Left
Behind Phase 2 Delivery Plan. The preparation of a Local Delivery and Improvement
Plan, and the COVID-19 response based on the principles which underpin the
approach contained within the partnership agreement with the Scottish Government. 
Updates on previous review content 
On the 3rd November 2021 it was announced that eight of the 11 Argyll and Bute bids
to the UK Community Renewal Fund (UKCRF) had been successful, and a three
month extension has been granted for project delivery from end of March 2022 to the
end of June 2022. This is a fantastic result for the area, with an overall award of circa
£2m. 
The successful projects, listed below, will contribute to the economic and social
recovery of Argyll and Bute, plus many will provide significant input to the outline and
full business cases for Rural Growth Deal proposals. 
UK Community Renewal Fund – Successful Projects for Argyll and Bute
Project Name Project Value
The Seaweed Academy £399,721
MACC Hydrogen Futures Viability Study £181,170
Optimising Carbon Sequestration for Community Wealth Building £260,000
The Dunoon Project Stage Two £352,600
West Coast UAV Innovation Logistics and Training Hub £170,000
Curriculum Development for STEM Hub Projects £100,000
Driving Economic Growth Through a Bounce Back Curriculum £269,856
Recovery and Regeneration of Tarbert £257,250
Total Project Value £1,990,597 
Work on key strands of economic activity continue, including Rural Growth Deal,
Levelling-Up and delivery of Community Renewal Fund projects by a range of public
and private sector stakeholders (as noted in Table 1 above). 
Page 326

Page 327

29 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
In particular, Argyll and Bute Council has received £1.449m from the Scottish
Government funding to deliver COVID Economic Recovery Fund. A number of
interventions have been approved to support local economic recovery and cost of
living impacts on low-income households. This includes a Small Business
Development Grant and a New Enterprise Support Grant, both offering financial
support of up to £3,000 with associated eligibility criteria. It is anticipated that this
funding support will be open to applicants in May 2022, with applications to the Small
Business Development Grant open until 31st January 2023 and those to the New
Enterprise Support Grant open until 31st August 2022, or sooner once funds are fully
committed. An additional Sector Support Grant will also be launched in due course.
All three grants will be administered by the Business Gateway team, Economic
Growth. 
Argyll and Bute Council’s Employability Team has a number of sources of support
available to help people into work - whether for young people looking to go into a job
or further education, employers looking to set up job placements, or supporting the
long-term unemployed to access skills, training and jobs.   
https://www.argyll-bute.gov.uk/forms/contact-employability-team
https://www.argyll-bute.gov.uk/helping-people-work 
The Scottish Government’s Islands Programme (IP): 
New proposals, which would see major investment in a host of ambitious projects
across Argyll and Bute’s island communities, are in development.
Councillors approved a range of options for possible inclusion in a funding bid to the
Scottish Government’s Islands Programme (IP). 
The initiative is a five-year, £30 million investment to help the delivery of the National
Islands Plan (NIP). It supports projects that encourage population growth, deliver on
Scottish Government net-zero ambitions and support a green economic recovery from
the impact of the pandemic. 
The 2022/23 programme will see £4 million allocated across the six island local
authorities via a competitive application process with a maximum of five applications
per local authority. 
The projects under consideration include: 
Coll / Colonsay - enhancing airport infrastructure at Colonsay and Coll airports
including; CCTV, creation of a small fire-training rig on both islands, improved
accessibility and new white lining machinery and runway surface cleaning equipment.
Mull - progressing phase two of Tobermory public realm work and flood resilience.
Bute – a multi-use Places to Play games area next to Rothesay swimming pool and a
play park adjacent to Winter Gardens/Visitor centre. 
Kerrera – the final phase of the new Kerrera North South Road. 
Islay – improvements to School Street, Bowmore, public toilets at Distillery House and
a new footway to improve safety at the narrow section of the road. 
Jura - improved infrastructure for Jura Ferry including a permanent alternative access
solution for small passenger only vessel when the Eilean Dhiura is off service. 
Page 327

Page 328

30 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Bute - provision of new business units for lease to aid recovery and growth. 
Port Ellen – enhanced access to Port Ellen ferry terminal to include improved
footways from the ferry to the village, a wider road and new bus bay close to the
island’s war memorial. 
Islay - new car parking next to Bowmore pier. 
Ulva - purchase of a larger ferry suitable for carrying pickups or trailers, loose freight
and livestock.
Island community hall - connectivity project – this additional option would enhance
digital connectivity to allow access to superfast broadband. Community halls/centres
would operate a new hybrid-meeting model and act as community digital hubs. 
Under the scheme, local authorities can submit up five applications each and must
apply via a bidding process. Applications close 10 June 2022.   
Fergus Murray, Head of Development and Economic Growth said: 
As our island communities continue the process of recovery from the pandemic, a
successful application to the Islands Programme would be a major boost to residents,
businesses and visitors. 
As many of the projects are at varying stages of development; the challenge will be
the competitive nature of the bid process, the short timeframe for both the submission
of the bid and securing the funding within the timeframe. We expect a second round
of the Islands Programme in 2023. 
Skills Development Scotland / Argyll and Bute 
School Service Offer - Our careers advisers work in partnership with every state
secondary school in Argyll and Bute, delivering career guidance to enable young
people from S1-S6 to develop their Career Management Skills via a range of group
work and 1-1 coaching conversations. We work closely with our partners within the
school to identify young person who are considered to be most at risk of not making a
positive progression from school, helping those young people to develop their career
management skills and move onto education, employment or training when they leave
school. 
From 1 June to 31 December 2021, we delivered 2,317 Career Information, Advice
and Guidance engagements for 1,475 school pupils through a mix of group and one-
to-one sessions. 
For more information, please click on the following link. What We Do - Scotland’s
Career Service   
School Leaver Cohort 20/21 - 801 young people left school during the 20/21 school
cohort and our team worked hard over the summer months to follow up whose had left
to ensure support was offered. The 2021 Annual Participation Measure showed that
of the 3,168 16-19 year olds in Argyll & Bute 93.5% were in education, employment or
training and personal development. 
Page 328

Page 329

31 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Post School Service Next Steps – Our service supports young people aged 16 – 18
(extended to 26 for care experienced young people) who are unemployed, helping
them to build up their career management skills and move on to and sustain a range
of options as appropriate: Training programmes, employability support, education and
employment.  From 1 April to 31 December 2021, we delivered 312 Career
Information, Advice and Guidance engagements for 190 post-school customers
through a mix of group and one-to-one sessions. 
Post school service: adults & PACE - Working in partnership with a range of partners
to support local hubs helping unemployed adults to develop their career management
and employability skills and move into employment. In Argyll & Bute our advisers have
worked closely with the employability partnership (DWP & CLD) to deliver support via
our local Youth Hub format. 
PACE: Partnership Action for Continuing Employment (PACE) is the Scottish
Government’s initiative dedicated to responding to redundancy situations. Through
providing skills development and employability support, PACE aims to minimise the
time individuals affected by redundancy are out of work. PACE brings together 24
organisations, together with the Scottish Government to provide free and impartial
advice, guidance and support for individuals affected by redundancy.  
PACE support is available to all individuals affected by redundancy. 
Advisers have extensive experience of dealing with redundancy situations and can:
Help with CV, job search, applications, and interviews, advise on benefits, staff may
be entitled to provide information on learning and training opportunities.  
PACE support is delivered using a variety of delivery methods including Face to face,
PACE Helpline, through webinars and enhanced online resources.
PACE Support in Argyll and Bute for the operational year April 2021 – March 2022
seen 5 employer and 47 individuals receiving PACE Information. 
Visit www.redundancyscotland.co.uk for more information or call 0800 917 8000 to
speak to an adviser. 
My World of Work- Our website provides trustworthy, expert information and advice
and it’s free to access for people at any stage in their career. The site is designed to
support people of all ages and stages, with activities and tools to help them identify
the opportunities open to them. Our school, post school and PACE career coaches
have been supporting Argyll and Bute customers by sign posting them to My World of
Work for opportunities and developing their career management skills. Parents and
schools have been using this service to support pupils with their career journey. Find
out more at www.myworldofwork.co.uk 
Care Experienced: Our advisers continue to work in close partnership with the Argyll
and Bute Council Throughcare/After Care and Social Work teams to work with young
people who are care experienced and to ensure our support is delivered at the right
time and with the relevant support from other key workers supporting the young
person. 
Page 329

Page 330

32 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Summary of Learning HUBS  
The Learning HUBS are being set up in 6 different locations across Argyll with Oban,
Campbeltown, Lochgilphead and Rothesay currently in operation with Helensburgh
and Dunoon coming on board by late summer.  The HUBS are for Adult Learners from
age of 16+ (who have left school). 
Adult Learning (Community Learning Services) set up and oversee them and have
been working in Partnership with other Services to look at how they can collectively
provide a holistic and safe space for those members of the community who are wanting
to access learning and increase their skills development.   
Partners who are regularly or weekly involved alongside the Community Learning
worker/s are SDS (Skills Development Scotland) and DWP Job Centre plus (JCP). 
Which brings added value and additional support.   
As the HUBS evolve other Partners will be invited to participate through session slots
to raise awareness of their services or to give guidance and support. Within their
communities.  (This will be different to each local area).   For example 
Housing, HCSP, Argyll College
Learner can access the HUBS for support in: Life Skills for Work and Personal
Development
Basic Digital skills
Employability support 
Accredited Learning Opportunities
Study Skills 
Information and sign posting to services and other organisations
Basic financial capability including budgeting
Learners new to social media and Internet (how to use it to keep in touch with
family/friends), online shopping, Banking, paying bills etc. 
Numbers of learners attending the HUBS are slowly increasing as Adult Learners start
to return to “life after lockdown” 
Attendance:  weekly average numbers mixture of regular attenders and Drop In/
attenders (may only attend once or twice) January 2022 – June 2022 (present) 
Learning HUBS Number of participants 
Lochgilphead  13
Oban 3
Rothesay 6
Campbeltown 8
Helensburgh 0
Dunoon 0
Area wide  total across all areas
combined  
On average 30 people per week
numbers slowly growing 
Page 330

Page 331

33 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Council Apprenticeships 
Since April 2021, we have employed 7 new modern apprentices. 4 of which were
funded as part of the Young Persons Guarantee which was supported by the
Employability Team. This brings the total number of apprentices employed to 69.
During this period, 6 apprentices have successfully completed their apprenticeship.
Out of those 6, 4 have gone onto secure posts with Argyll and Bute Council. Overall,
we still have a high rate of apprentices going onto secure employment with Argyll and
Bute Council on completion with 75% off all apprentices completed securing a job with
the council. As our apprenticeship vacancies are offered based on workforce need
determined through our workforce planning process we are hopeful this rate will
remain high. 
We have reviewed the tools we have in place to support apprentices and mentors to
ensure apprentices continue to get a positive experience despite our hybrid working
environment.  We have also continued to offer our foundation apprenticeship in social
services children and young people across schools within Argyll and Bute. They gain
a qualification which is equivalent to a Higher and at the same time get to experience
a work placement which provides them with key experience, skills and knowledge.
This is not only a brilliant addition to a school leavers CV, but it allows Argyll and Bute
Council to grow a quality Early Years workforce for the future.  Argyll and Bute Council
continues to works closely with schools to facilitate work placements for young people
where possible and has established links with DYW Argyll to offer opportunities for
young people in the local area where it is possible to do so. Over the past few months,
we have begun to relook at our materials to support work placements and promote the
council as an employer to provide awareness to young people of the opportunities
which are available to them within Argyll and Bute. 
Education 2021-2022 
Following a period of remote learning and prioritising the re-introduction of P1-3 pupils
in schools, primary pupils returned to school full time from the 15th March 2021.  From
the 15th March, all secondary pupils received a combination of face to face teaching
alongside remote learning.  Secondary schools worked closely with their local
communities and council to decide how to safely balance in school learning based on
their local context.  Senior phase students (S4-S6) who were taking national
qualification were given priority for face to face lessons in school. 
After the Spring Break 2021, all pupils returned to full time in-school learning, with
mitigating measures in place to support the health and safety of the school community
and minimise disruption to educational continuity.  Schools have managed changes to
guidance throughout the academic year.  Argyll and Bute’s schools have been
consistently and effectively responsive to the directives of the Scottish Government.
All education establishments continued to have contingency plans in place for any
return to remote learning and effective communication with parents/carers from both
schools and the Education Authority has been a priority.  This has allowed schools to
respond quickly to changing demands that Covid absences placed on our school
communities. 
Page 331

Page 332

34 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
The Education Authority clearly recognises the risks which periods of school closure
have posed for learners’ progress. It has been working closely with schools to ensure
that all aspects of educational provision balance children’s welfare, health and
wellbeing needs with the requirement to ensure that any gaps in learning caused by
school closure are addressed. The Health and Wellbeing of our whole school
community, Nurture, Literacy and Numeracy recovery and Outdoor learning have been
key priorities in supporting the return to school. 
Assessing learners’ progress in literacy, numeracy and other curricular areas, in order
that the next steps in learning can be identified, has remained a priority. The role of
PT Recovery and Renewal – Literacy and Numeracy was created in October 2021.
Since then, we have used authority data to establish contacts within a number of
schools where pupils were at risk of falling behind.  The PT Recovery and Renewal
has worked with head teachers within these schools to consider how best to target
interventions and, where appropriate, offered training in delivering interventions to
ASN and teaching staff. This is central to closing the attainment gap. Parents / carers
have been supported through the development of a website outlining simple ways in
which they can support their child’s learning at home. Bespoke training in a range of
literacy and numeracy resources has been delivered to staff.  Individual school support
has been provided as well as a range of CLPL opportunities for staff across the
authority, focussing particularly on developmentally appropriate pedagogical
approaches that offer support and challenge for pupils at their stage of development,
rather than their chronological age. Many CLPL opportunities focus in particular on
writing as this is an area where pupils have struggled over lockdown.  
Digital technology has continued to be used to engage pupils and parents with online
platforms such as Google Classroom, Microsoft Teams and SeeSaw.  Schools have
continued to respond to pupil needs and family circumstance, where possible,
providing materials during periods of isolation.  Recognising the importance of family
involvement and engagement in improving outcomes for children and young people,
the local authority invested in technology to ensure that Parents’ Evenings could
continue via online appointment sessions. 
A PT of Nurture was appointed to support the delivery of Trauma training and the
development of Trauma Informed schools as part of our “Our Children Their Nurturing
Education”.  This work has been implemented to date through 2 cohorts (in March
2021 and November 21) of training and has engaged 29 schools to date.  From this,
5 schools have achieved bronze accreditation (Nurture Committed), 2 have achieved
silver (Nurture Aware).  A third cohort of training will focus on early years
establishments.  Our Children Their Nurturing Education (OCTNE) and the work of our
schools is included as the first case study in Education Scotland’s published report
Health and Wellbeing: a thematic review, sharing the effective interventions delivered
in Argyll and Bute.  The mental health and wellbeing of pupils has been further
supported by the introduction of counselling service within schools has also helped
support the health and wellbeing of young people.   
Outdoor learning has been key approach to re-connecting pupils to their school
community, providing a healthy learning environment, looking after physical wellbeing,
re-establishing positive relationships and managing the change from learning at home
to learning in school.  The education services have been working closely with local
Page 332

Page 333

35 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
outdoor education providers since March 2021 to support children and young people
throughout the authority recover from the impact of the Covid-19 pandemic.  Originally,
the providers worked with the secondary sector whose young people were learning
from home and in some cases not engaging with school. These young people were
offered a chance to carry out activities that were out with their normal comfort zone.
Activities included: team building, fire building skills, orienteering, map reading and
archery.  Following the summer holidays, the programme was extended to include
every school across Argyll & Bute, including those very remote, rural schools.
Feedback on the programme has been positive from all involved, including parents,
teaching staff and – most importantly – the young people themselves. Active Schools
provided further targeted support for young people who struggled with the transition
back to school, using sport and teamwork to raise self-esteem and help pupils re-
establish a sense of belonging. 
Primary Schools have also capitalised on outdoor learning opportunities.  The success
of this work was evidenced within Thematic Inspection evidence by Education
Scotland that examined outdoor learning approaches.  Argyll and Bute features in the
report as a result of these thematic inspections. 
A Maximising Attendance working group has examined attendance issues within
schools since the return to school in August 21.  A Principal Teacher for Maximising
Attendance (temporary) was appointed (April 22) to work with schools and families to
address barriers to attendance in order to improve outcomes for children/young people
and their families.   
A summer programme of events delivered to young people across Argyll & Bute
Council who were adversely affected by the impact of the Covid-19 pandemic.  The
programme was funded by Scottish Government and was run by Argyll & Bute Council
in partnership with other organisations. The funding was for the delivery of activities,
childcare and food for children aged 5-14 years old from low income families. We
engaged with around 1,600 young people each week of the 3 week
programme.  There were 3,000 eligible. 
Planning is underway for the Summer Activities again this year.  There have been
some changes to the eligibility criteria.   We will continue to target families as we did
last year, although the priorities laid out this year are as follows: 
• Children from lone parent families 
• Children from ethnic minority families 
• Children from families with a disabled adult or child 
• Children from families with a young mother (under 25) 
• Children from families with a child under 1 year old Children from larger
families (3+ children) 
Based on the criteria, the number expected to be eligible is in the region of 4,000.
20 Education staff signed up for the Poverty Awareness Training delivered by the
Poverty Alliance through Argyll and Bute Council.  There was representation from all
across the education service at this training including Early Years, Education
Management, Head Teacher, class teachers and Family Liaison Workers.  Pupils from
a secondary school Pupil Equity Group were also invited to attend this training.  In
Page 333

Page 334

36 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Partnership with the Child Poverty Action Group, a follow up professional learning
session was delivered to discuss approaches to capturing parent and youth voice on
child poverty.  Work was highlighted that had been undertaking in schools with regards
to the cost of the school day.  This session resulted in some small group work and
targeted individual work to capture the views of those with lived poverty experience. 
This will feed into individual school Pupil Equity Fund Plans and School Improvement
Plans.  Strong parental and pupil voice views express that the school clothing
recycling/exchange programmes are welcomed.  A parental survey undertaken in
March 22 showed that 62% of parents/carers agreed or strongly agreed that the cost
of the school day was affordable.  Those strongly disagreeing equated to 6.5% of
respondents with the remaining neither agreeing nor disagreeing. 
Survey evidence from 2 of our large secondary schools demonstrated that there are a
lot of activities to do within Argyll & Bute, however 14% identified a lack of transport
as a barrier to accessing activities.  35% of young people identified that they rely on
parents/carers to transport them to activities because they are living in a countryside
location; this is 19% higher than the Scottish comparison.  4% of pupils cannot
participate in activities outside of school due to finance, this is 1% below the Scottish
comparison figure.   
On 10th January, under 22’s have been eligible for free bus travel in Scotland.  Schools
have supported the promotion of this entitlement. 
Early Years 
Following a period of remote learning and prioritising the reopening of all ELC settings
and childminders, children returned full time from the 15th March 2021.  
Mitigating measures are in place to support the health and safety of the nursery
community and minimise disruption to their education and its continuity.  The settings
in Argyll and Bute have been consistently and effectively responsive to the directives
of the Scottish Government and adhered to guidance from the Care Inspectorate. All
settings continued to have contingency plans in place for any return to remote learning
and effective communication with parents/carers from settings and the Authority’s
Early Years Team have been a priority.  The Early Years Team has supported settings
continuously over the last year when there have been high rates of absence due to
Covid-19, to ensure that the settings remained open for children to access their
education. 
Our Cluster Leads, in particular, have planned for and carried out targeted work for
children living in lower bands of SIMD. Our Family Support workers have been liaising
with Health Visitors to support families to address health and well-being concerns,
parental advice and supporting children returning to ELCs after a period of closure. 
The support officers have worked closely with settings to track and assess learners’
progress in literacy, numeracy and other curricular areas, in order that the next steps
in learning can be identified. Significant CLPL opportunities have been offered to staff
to focus on Covid recovery to support all children. These training sessions have been
very well received with a high percentage of staff accessing these and implementing
advice into their own settings. 
Page 334

Page 335

37 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
A PT of Nurture was appointed to support the delivery of Trauma training and the
development of Trauma Informed schools as part of our “Our Children Their Nurturing
Education”.  There is to be a new cohort of training which will focus on early year’s
establishments.   
Outdoor learning has been a key outcome on the Early Years annual plan and delivery
of training has continued to take place throughout all areas. Our target of a minimum
50 percent of time being outdoors has been met and exceeded in 98 percent of all
settings. This is providing a healthy learning environment, looking after physical
wellbeing, re-establishing positive relationships and managing the change from
learning at home to learning in ELC.  Our Cluster Leads will continue to extend their
training into the next academic year. 
UHI Argyll and University of the Highlands and Islands 
The academic year 2021/2022 has continued to be heavily impacted by Covid-19 with
very little direct face to face teaching being possible.  Courses with heavily practical
elements were prioritised for access to college premises but theory classes were all
delivered remotely using the college virtual learning environment and Webex
platforms.  This meant that the college had to ensure that all students had access to
suitable IT equipment for this.  More than 80 laptops were loaned out to students for
the duration of their course, most of these were laptops purchased by the college using
Scottish Digital Poverty fund and the college’s own resources for this.  Unfortunately
cheaper Chromebooks and tablets are not compatible with the different technologies
used to deliver quality remote learning so the provision of reasonable spec laptops
was essential.  Connectivity issues were difficult to manage at times as the local
infrastructure meant that dongles were often not effective either in areas where there
was poor internet.  Although most of the learning was carried out remotely teaching
was still based around timetabled classes so that students could still link in and get an
element of classroom experience. 
Support staff continued to support students to access relevant funding – Bursary,
EMA, Student Loan etc. and provided a lot of one to one help with this.  Scottish
Government provided Covid-19 support funds via SAAS and Scottish Funding Council
to allow students and families to get more support where Covid-19 had caused
additional hardship.  At least 30 students were helped from these funds.  Since March
2022 there has been a noticeable increase in students applying to the Hardship funds
for support with cost of living increases.  The rise in fuel price has been cited by
students as the most common cause of further hardship.  This situation looks likely to
continue in the next academic session. 
The College Counselling service has been more heavily used during 2021/ 22 than
the previous year with 42 students benefitting from this service.  This rise in numbers
was not unexpected and the college Counsellor was able to cover this with only a
slight increase to waiting times (these still remained at two weeks or less).  Students
also are encouraged to access Wellbeing Resources managed through Togetherall
and Spectrum Life – two online services subscribed to by UHI. 
Other college support services continue to be delivered through a mix of online and
face to face.  Learning Support has often been extremely effective for students when
Page 335

Page 336

38 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
delivered via Webex or other platforms, finding it more convenient to arrange support
times, have quick “drop in” meetings etc.   
Information that would normally be promoted to students via posters within the learning
centres is passed out by email / social media campaigns from time to time, co-
ordinated with visits to the online classrooms to give more information.  Examples of
these would be reminding students of the availability of period products via Hey Girls,
where to find information and support for gender based violence etc. 
Over the last year all our centres have front line staff that have undergone Gender
Based Violence awareness training and Scottish Mental Health First Aid training. 
B. Increasing Income through Benefits
Flexible Food Fund 
Launched on 11 January 2021 the Argyll and Bute Flexible Food Fund (FFF) uses
funds provided by the Scottish Government to support people with financial
insecurities to pay for food and fuel during these tough times. The fund provides a
payment made to householders if they prove that they do not have the minimum
income in their bank accounts to cover the costs of food and/or fuel for a month.
Householders or claimants are then incentivised to engage with the advice agencies,
Bute Advice Centre and ALIenergy, by securing a second monthly payment if there is
evidence that they have taken advantage of these professional services to help them
learn how to manage their financial situation in the medium to long term. Failure to
engage with the service means that no further grant funded support is made to the
claimant. 
Householders or claimants are encouraged to make claims to the Flexible Food Fund
online using an electronic form on the Council website however an alternative gateway
is available through the Argyll and Bute Community Food Forum which involves all of
the foodbanks in the area.  This means that people regularly presenting at foodbanks
for food packages are also getting referred to the FFF project where their needs for
immediate support is assessed as is their overall circumstances. They are given the
support they need to enable them to live on the resources that they are entitled to
receive. Over 95% of householders or claims submitting a claim are engaging with the
advice services. 
• Advice services provide the following support:
• Money advice, money management and budgeting skills;
• Income or benefit maximisation;
• Debt advice;
• Fuel poverty advice including;
• Access to fuel vouchers;
• Debt relief;
• Warm home discounts;
• Home heating, efficiency measures, switching, support with appliances and the
home heat fund. 
At the end of April 2022, after just under 16 months there has been 1,007 families
supported and the combined total client gain is £1.325 million meaning that the
Page 336

Page 337

39 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
average client gain per household is £1,315. In addition the team are managing a debt
portfolio of £174,000 across all claimants where they continue to negotiate with
creditors to reduce the arrears of individuals and families receiving support. 
The project has received acclaim as being highly commended at the Institute of
Revenues Rating and Valuation (IRRV) for Excellence in Innovation. Between August
2021 and November 2021 a team of staff from the project travelled across Argyll and
Bute promoting the project and networking with other key frontline staff in many of our
most rural communities in order to provide additional support to those struggling the
most.  Bute Advice Centre (BAC) collaborated with IFAN and representatives from the
Argyll & Bute Community Food Forum to create a leaflet that highlighted advice
providers across the region.  A section specifically highlights the Flexible Food Fund. 
These leaflets were distributed widely.  Around 7000 have been provided to clients
and support services through the roadshow.   
The case studies below show the impact that this project is having in supporting
people in Argyll and Bute. 
Case Study 1 Family 
A single parent in Helensburgh was able to secure a new job having been unemployed
for some time.  With young children to provide for she was very concerned about her
finances and coming off Income Support after such a long time.  The client was
reassured and given support to claim UC.  She was also advised of the need to claim
separately for her council tax relief.  She was surprised as she had always believed
she claimed them together.  Her adviser explained that the same system was not in
operation under UC.  This prevented council tax arrears accruing.  The client was
surprised at how much better off she was in work.  She has yet to organise her
childcare but when this happens her adviser will support her to access financial help. 
The FFF project has brought relief to a young mum who was worried about this big
change in her life and the initial financial challenges. 
Case Study 2
Client L is a woman who is currently unemployed and has been throughout Covid
times since she is so extremely allergic to latex that she will have an extreme reaction
if, for example, she is on public transport and another passenger at the other end of
the bus/train carriage is wearing latex gloves. Her rented flat is centrally heated by old
electric storage heaters. She has found these to be very expensive and ineffective so
Page 337

Page 338

40 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
she has them turned off and relies on her coal fire to heat the whole flat. She lives in
fuel poverty i.e. she spends more than 10% of her benefit payments on electricity and
struggles to afford food. She was, indeed, referred to Alienergy by the Bute Advice
Centre who have helped her access the Flexible Food Fund run by the Argyll and Bute
Council which awards food vouchers to those in need, i.e. a more anonymous version
of a food bank.  Initially when Alienergy contacted her, L assumed that we were cold-
calling electricity suppliers and was brusque and dismissive and hung up prematurely.
Alienergy persisted and were able to gain her confidence. L told Alienergy that she ate
meals at friends’ houses whenever she was invited on days when she had no money
but she was afraid of the shame of asking them, ever, for a meal or telling them how
poor she had become.   
When L found she had no money at all, she correctly contacted her electricity supplier
and told them and they froze her debt repayments until she had a bit more. Alienergy
are registered with the Fuel Bank of Scotland and thus were able to apply to the Fuel
Bank Heat Fund for a fully funded 50kg load of coal to help her through the winter. The
Heat Fund organised delivery with of her normal smokeless coal preference with her
normal local supplier and paid for it including the delivery charge which occurred within
a few days. Alienergy also successfully applied for 3 x fuel vouchers worth £49 each
to top up her electricity prepayment meter with credit to keep her from having to self-
disconnect and live without power in her home in the depths of winter. Alienergy helped
decipher somewhat confusing mail that L had received from her electricity supplier,
give her general advice on her tariff type and changing to a competitive supplier
options and advice on how to reduce her consumption with a few adjustments to her
behaviour.  New efficient appliances can help with reducing electricity consumption
and Alienergy ascertained that of L’s white-goods, her fridge-freezer was old, second
hand and faulty to the point of being dangerous to health. With L’s consent and
cooperation, Alienergy made a successful application to Glasspool Trust who provided
the funds for L to procure a new fridge/freezer and get it delivered and installed.   
L is very glad that Alienergy persisted in trying to contact her and said in an email: “Oh
gosh thank you so much you're so helpful.   
Client Gain through Advice Activity: 
Once again Advice Services across Argyll and Bute have managed to make a
considerable difference in the lives of people who are struggling.  The table below
shows the client gain from 1 April 2021 to 31 March 2022 for the citizens of Argyll and
Bute as £10,165,000. 
Organisation
2021/2022            
(£)
Bute Advice Centre 1,866,000
Argyll and Bute Council Welfare
Rights 2,729,000
ACHA Welfare Rights 4,192,000
Argyll and Bute Citizens Advice
Bureau 1,068,000
ALIenergy 310,000
TOTAL 10,165,000
Page 338

Page 339

41 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
A book entitled “Do You Have Money Worries” has been produced and circulated
widely; it contains a wealth of information on how to maximise income and deal with a
host of issues and challenges created by the cost of living crisis.   
C. Cost of Living 
Housing 
Affordable Housing 
Often, a family's most significant monthly expense is their rent/mortgage; providing
more affordable homes will alleviate a critical driver that pushes families into poverty. 
The first objective of the Local Housing Strategy is to provide an adequate supply of
affordable homes. In 2021/22 there were 289 households with children under 16
rehoused via HOMEArgyll, out of a total of 733 RSL allocations, amounting to 39% of
the total RSL allocations that year. In total this equates to 467 children rehoused in a
permanent secure and affordable home. 
There are 636 families with children under 16 on the HOMEArgyll waiting list as of
September 2022, out of a total active waiting list of 2,477 (26%). This amounts to 1,180
children in total in housing need. 
The housing strategy also aims to provide families with access to housing that is the
right size to meet their needs. Research shows that children who live in overcrowded
housing find it challenging to find a place to do homework and study, negatively
impacting their life chances and keeps them trapped in a cycle of poverty. In
September 2022  only 8% of families on the HOMEArgyll housing waiting list required
a three-bedroom property and less than 3% required 4 or more bedrooms. 
Housing condition 
Tackling housing in poor condition will improve children and young people's standard
of living. Research suggests a relationship between poor housing and lower
educational attainment, and if this is so, then the life chances of children and young
people are affected. Hence, it affects the standard of living for children and young
people at this time and reduces their standard of living as adults and or parents. The
Council supports discretionary repair and improvement work as well as mandatory
disabled adaptations to private sector properties via the Private Sector Housing
Grant  while housing associations carry out planned cyclical maintenance and
improvement works on their stock and deliver necessary adaptations with investment
from the Scottish Government, all of which can benefit local residents and property
owners including those with young children to improve health and well-being and
tackle poverty. 
Page 339

Page 340

42 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Link between housing age and fuel poverty 
The age of a property has a significant impact on whether the household will be in fuel
poverty. Fuel poor households and those in extreme fuel poverty are more likely to live
in homes constructed pre-war rather than post war, as can be seen by the table below. 
Table 1: Age and type of housing of those in fuel poverty 2017-2019 (data is correct
at time of publication) 
Link between housing type and fuel poverty  
Table 1 shows that households in fuel poverty are also more likely to live in a flat (40%)
compared to those who live in a house (29%). This is also the case nationally.
Conversely, in Argyll and Bute those in extreme fuel poverty are more likely to live in
a house. 
Link between housing location and fuel poverty 
Fuel poverty is not equally distributed throughout Argyll and Bute but rather more
marked in some housing market areas. For example Figure 1 shows that Bute has 41-
50% of the population in fuel poverty whereas Cowal has less than 20% in fuel poverty.
Fuel poverty hot spots are in the islands, Kintyre and Oban and its hinterland. We will
work in partnership to address fuel poverty and prioritise fuel poverty hot spot areas. 
Page 340

Page 341

43 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Figure 1: Fuel Poverty in Argyll and Bute (data correct at time of publication)  
Energy Efficiency and Affordable warmth 
The Government has recently raised the Energy Price Cap, which has resulted in a
sharp rise in energy costs adding hundreds and, in some cases, over a thousand
pounds to a household's energy bill. These cost increases will push many families into
poverty. Housing Services are working with partners to ensure that households reduce
energy consumption to alleviate the spiralling costs of energy in their homes. The LHS
outlines a series of actions to reduce energy consumption, such as:   
Houses developed through the Strategic Housing Investment Plan (SHIP) will be
energy-efficient new build homes. One of the Council and Scottish Government
prioritisation criteria for awarding SHIP funding is that these affordable new build
homes should be designed and built to Greener Standards. In this authority,
Registered Social Landlords (RSL) pioneered the development of the innovative
Passivhaus model of housing at Innellan in Cowal. Another RSL has utilised SHIP
funding to finance a new Passivhaus scheme in Garelochhead. These schemes
require the home to have a 75% reduction in space heating requirements than a
standard new build home. Several other energy efficiency measures and initiatives are
being developed and piloted within SHIP new builds, such as district heating systems.
There is a presumption that all future new builds delivered by the SHIP partnership will
achieve these standards. However, new build homes only account for a small portion
of housing stock. 
Minimising all families' energy consumption will require existing homes to be retrofitted
with measures to improve the fabric of the building and increase energy efficiency.
Page 341

Page 342

44 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Consequently, the building will require less energy to reach a comfortable
temperature. Reducing the heating demand in homes will contribute to lower heating
bills and hence help to alleviate child poverty. The Local Housing Strategy outlines the
tools and programmes to improve Argyll and Bute's energy efficiency. These are as
follows; 
The council has advocated taking a "fabric first approach", which ensures that the
building's fabric is improved before insulation measures are installed. The insulation
programme is financed by Home Energy Efficiency Programme Scotland: Area Based
Scheme (HEEPS: ABS) and managed by the council. This scheme offers residents in
Council tax bands A-C properties energy efficiency measures. The scheme is also
open to properties in higher council tax bands, which were extremely energy
inefficient. HEEPS: ABSs has invested almost £7.25m of energy efficiency measures
in the local housing stock. Since 2017, 1,147 households have received insulation
measures through the HEEPs ABS programme. Insulation measures make homes
warmer while reducing energy bills. 
RSLs have implemented the Energy Efficiency Standards for Social Housing (EESSH)
in most properties. In 2021 88% of properties were EESSH compliant. EESSH set out
the minimum energy efficiency rating that social landlords were expected to achieve
across their housing stock by 2020. Not all social housing stock can be made
compliant with EESSH due to the building fabric, location, or mixed-tenure issues
resulting in some exemptions or abeyances. The new EESSH2 proposals include
further energy efficiency targets for social rented homes and incorporate a set of
energy efficiency standards for Private Rented Sector (PRS) homes and owner-
occupied homes. 
Since 2020, Argyll and Bute Council has supported ACHA with their Warm Homes
Project. £1million is funding external wall insulation to private homes in mixed tenure
blocks. This supports ACHA's broader programme where they are installing over 1,000
air source heat pumps across Argyll and Bute. ACHA has also secured Scottish
Government Social Housing Decarbonisation Funding to pilot a demonstrator project. 
Installing renewable energy solutions is another lever that can reduce energy
consumption. The council is currently working with HIE, Scottish Government and the
local community on Islay to explore feasible options and scenarios that would assist
in delivering local energy networks on the island to overcome grid capacity challenges.
Additionally, there is a proposed Heat Network project in Iona, and both projects would
aim to reduce energy costs and take some of the burdens from family finances.
Registered Social Landlords are installing heat pumps to reduce the amount of energy
used by households to heat their homes. 
Energy efficiency measures are essential to keep homes warm with minimal energy
usage, reducing most energy bills and reducing families' financial burden. However,
when households move from gas heating systems to electrical heating systems used
by heat pumps, this can increase bills due to 1KWh of electricity being more expensive
than 1 kWh of gas. To avoid this effect will require action at the Governmental level to
reduce the price of electricity relative to gas which could be achieved by axing the
"Green Levy" on electricity. Improving energy efficiency and providing affordable
Page 342

Page 343

45 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
homes will address some of families' most significant expenses and the drivers of child
poverty. 
Housing vulnerable families who are more likely to be in poverty 
The Local Housing Strategy recognises that children and families in particular
situations are more likely to experience poverty, and hence the LHS outlines a series
of actions to address disadvantage and alleviate poverty, such as:
Preventing families and young people from becoming homeless. The housing options
service assists families and individual young people aged 16-18 to identify the type of
home they need and can afford, which reduces the number of failed tenancies, thus
ensuring more tenants can remain in their homes. This preventative work reduces
incidences of homelessness which contributes to reducing child poverty. 
There was a significant decline in the number of homeless children in Argyll and Bute
over the last five years from 319 in 2017/18 to 175 in 2021/22. In 2021/22, 374
homeless cases were closed, of which 119 involved households with dependent
children (amounting to 196 children in total) and 87 of these households received a
positive outcome. 
ALIenergy
Fuel Poverty 
The current crisis of fuel poverty and cost of living is worse in the rural north west of
Scotland than anywhere else in the UK. There are reasons why fuel poverty levels are
particularly high: there is typically a dispersed population and poor infrastructure; we
have elderly demographics, low incomes, poorly insulated housing and bad weather;
the pandemic hit people hard, because there is normally a heavy reliance on tourism;
and crucially, there is a lack of mains gas, so people are forced to use more expensive
heating options. Electric heating is typically 3-4 times as expensive as gas heating,
but many households across Argyll and Bute have no choice but to use it. 
Regional statistics for fuel poverty in Scotland from the Scottish House Condition
Survey show that in 2019, before Covid-19, fuel poverty already affected about one in
three households in Argyll and Bute, and one in five were in extreme fuel poverty.
Recently, revised Scottish Government figures show that fuel poverty is now estimated
to be 43% higher than in 2019. This means that in the Argyll & Bute and Highland
regions, fuel poverty is likely to be approaching 50% and extreme fuel poverty,
probably almost 30% of all households – and further significant price increases seem
likely yet to come. Enhanced media coverage has heightened awareness of the
appalling and widespread nature of the challenge facing rural Scotland: many more
households are now finding themselves in an increasingly desperate situation, many
are self-rationing to the extent that they are seriously risking their health and wellbeing
– and/or becoming deeply indebted to their energy suppliers in order to keep warm.
Argyll, Lomond and the Islands Energy Agency (ALIenergy) has been working to
alleviate fuel poverty in Argyll and Bute for over 20 years. 
Page 343

Page 344

46 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
ALIenergy’s advisors offer in-depth advice and support, typically involving several
sessions working with the client, and sometimes also with their support worker or
carer, or other referral partners, over a period of several weeks/months. This involves
a dual approach, first to identify and access any available immediate and urgently
required financial assistance to pay bills or clear debts, or to provide emergency
prepayment meter vouchers, fuel deliveries, or any essential electrical appliances that
are missing or broken – and then to support ongoing resilience through a range of
advice topics including using home heating and appliances more efficiently; helping to
understand energy bills and meter readings; discussing options for suppliers, tariffs
and meter types; setting up online accounts; addressing damp and condensation
issues; and helping to access the Scottish Government funded heating replacements
and insulation schemes through Home Energy Scotland. ALIenergy also provides a
range of advice leaflets and also small useful ‘cosy kit’ household items to help people
to keep warm, such as blankets, socks and hot water bottles. 
Beneficiaries are typically vulnerable or disadvantaged for reasons such as low
income, poor health, disability, unemployment, single parent households and the
elderly. However, recent price rises have been so severe that many households that
would not normally be described as particularly vulnerable or disadvantaged, are now
finding themselves struggling for the first time, unable to afford to heat their homes
adequately, and having to choose between eating and heating. Fuel poverty is
associated with multiple deprivations: poor health, loneliness and isolation, poor
educational outcomes, low employability and debt, and ultimately, shockingly, loss of
life through excess winter deaths. 
ALIenergy takes direct client enquiries and also works closely with a range of other
organisations including Home Energy Scotland, food banks, housing associations,
advice agencies, health and social care professionals and other charities, all of which
commonly encounter clients in fuel poverty and refer clients. This is an extremely
effective method to engage with otherwise hard-to-reach client groups, who might not
otherwise come forward. 
ALIenergy had 1237 clients registering in the year Apr21 – Mar22 with a significant
increase over the winter months as prices went up and the weather became colder. 
Page 344

Page 345

47 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Immediate financial gains measured by ALIenergy in 2021-22 
ALIenergy is a registered referral partner with Fuel Bank Foundation. Through the Fuel
Bank Foundation, prepayment meter vouchers and bulk heating fuel deliveries can be
accessed. In the period April 21 – March 22, 773 prepayment meter vouchers were
accessed to a total value of £33,108, supporting 950 adults and 597 children in Argyll
and Bute, whose households were close to or already using the emergency credit
facility on their electric and/or gas meter, or had already self-disconnected. 36 bulk
heating fuel deliveries (oil, coal, firewood) were also secured worth around £9,000 in
total, direct to households who could not afford heating fuel deliveries. 
ALIenergy is a registered referral partner for the Scottish Government Home Heating
Support Fund – this scheme provides financial relief for energy debt and ongoing costs
to energy consumers who are experiencing significant financial hardship regardless of
the fuel or payment method used. This year’s scheme opened in January 22 and by
31/3/22 we secured 54 awards totalling £47,390in debt write off and contributions to
ongoing costs. 
ALIenergy is a registered partner of the Glasspool Trust, allowing access to funding
for free white goods (cookers, washing machines, fridges, freezers) for low income
households where an essential electrical appliance is missing, faulty, or very old and
energy inefficient. 67 free appliances were successfully applied for from the Glasspool
charity in the year March 21 – April 22, worth £20,808 in total, to households where
essential appliances were broken, missing, or very old and energy inefficient. 
Since October 21, ALIenergy has been able to access some financial assistance for
clients from Argyll and Bute Council’s Flexible Fund, and awards have been made to
71 households in Argyll and Bute to the end of March, totalling £18,988, towards
energy debt relief and ongoing costs. 
Page 345

Page 346

48 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Social Security Scotland 
The Scottish Government’s 2nd Tackling Child Poverty Delivery Plan (Best Start, Bright
Futures), backed up by up to £113m extra investment this year, sets out bold action
to drive progress on the national mission to tackle child poverty. 
The actions set out are projected to drive child poverty in Scotland to the lowest levels
in 30 years, with current projections suggesting 60,000 fewer children could live in
relative poverty by 2023 compared to 2017 (to 17%, from 24%). 
This includes lifting an estimated 50,000 children out of relative poverty in 2023
through the Scottish Child Payment. 
By the end of 2022, the Scottish Government’s package of five family benefits for low
income families, administered by Social Security Scotland, will be worth up to a
maximum of over £10,000 by the time a family’s first child turns 6 – and £9,700 for
second and subsequent children. 
Social Security Scotland is responsible for administering a number of benefits that
have been devolved to Scotland. 
Currently, Social Security Scotland administers twelve benefits, seven of which are
brand new. The benefits include: 
Carer’s Allowance Supplement – an extra payment of £245.70 paid twice a year for
people in Scotland who get Carer's Allowance on a particular date. 
Best Start Grant - is a package of three payments that will give extra money to families
on certain benefits or tax credits during the early years of a child’s life.
Best Start Grant - Pregnancy and Baby Payment –one off payment of up to £642.35
from 24 weeks in pregnancy up until a baby turns 6 months for families who get certain
benefits. This goes up to 1 if you've taken over looking after a child, such as if you've
adopted. You get £642.35 for your first child or £321 for any subsequent child.
Best Start Grant - Early Learning Payment – one off payment of £267.65 when a child
is between two and three years and six months. People can still apply if your child is
not taking up a place at nursery
Best Start Grant - School Age Payment – one off payment of £267.65 for eligible
families around the time a child normally starts Primary 1. People can still apply if they
are deferring school entry.
Best Start Foods - a prepaid card for families to help buy food for children under 3 or
during pregnancy.  It replaced the UK Government’s Healthy Start Vouchers in
Scotland. 
Funeral Support Payment - a payment available to people in Scotland, who are on
certain benefits or tax credits, and need support to meet the costs of a funeral. 
Young Carer Grant - a yearly payment of £326.65 for young carers aged 16 to 18 who
live in Scotland and care for people for an average of 16 hours a week or more.
Job Start Payment -  a one off payment of £267.65 for 16 to 24 year olds, or £428.25
if the main carer of any children, who have been out of work and on certain benefits
for six months or more to help with the costs of starting a job.
Child Winter Heating Assistance –a payment of £214.10 to help disabled children
and young people and their families with increased heating costs over winter. 
Scottish Child Payment – a benefit unique to Scotland of £80 every four weeks to
Page 346

Page 347

49 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
eligible families and carers to help towards the costs of looking after each child under
6. There are no limits on the number of eligible children supported by the Scottish
Child Payment.
Child Disability Payment - provides support for the extra costs that a disabled
child might have, whether mental or physical disabilities.  People can apply for Child
Disability Payment for a disabled child under 16 however Social Security Scotland
will pay Child Disability Payment until the child is 18.
Adult Disability Payment – is extra money to help people who have a disability or
long-term health condition that affects your everyday life.  This benefit is currently
live in 3 pilot areas in Scotland and will be available in Argyll and Bute from 29th
August 2022. 
Coming up 
Subject to parliamentary approval, Scottish Child Payment will extend to under 16 year
olds and rise by a further £5 to £25 per week, per child, later in 2022. By that point
around 430,000 children living in low income households could be eligible – a fourfold
increase on the 104,000 children we are already helping. 
At this point the Best Start Early Learning Payment and Best Start School Age
Payment will be paid automatically to parents and carers receiving Scottish Child
Payment when their child becomes eligible. 
Social Security Scotland is working in close partnership with organisations across
Argyll and Bute to maximise the take-up of these benefits, including:   
FIAG (financial inclusion and Advice Group);
Child Poverty Action Group;
All our Children Group; 
Carers Centres;
Early Years including nurseries;
Schools; 
Midwives and Health Visitors;
Child Health and CAMHS;
Skills Development Scotland;
Employability;
Living Well Networks;
Welfare Rights staff;
Housing Associations;
Home Energy organisations;
Health and Social Care Partnership;Health Improvement staff. 
Page 347

Page 348

50 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
Free School Meals and Holiday Provision 
Since the last Action Plan Update, free school meals support for entitled pupils has
remained a key way of tackling the cost of living challenges for families with children: 
All children in receipt of 1140 hours of childcare in early years' settings receive a free
school meal, along with free milk and a healthy snack. 
Page 348

Page 349

51 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Work continues to implement the extension of universal free school meals to all
Primary school pupils, with all pupils in P1 – P5 now entitled to a free school meal. 
In preparation for forthcoming roll out of free breakfasts, a survey is being undertaken
to map the current breakfast provision across all schools in Argyll and Bute. 
National work has been undertaken between ASSIST FM and SPIRU to better
understand the decisions made by and opinions of secondary school pupils at
lunchtime. A survey was undertaken which over 15,000 pupils in Scotland responded
to, and four Secondary Schools in Argyll and Bute received bespoke, school-specific
reports on the views of their pupils, so that decisions can be made around provision
based on pupil feedback.   
Cash payments in lieu of free school meals for those in receipt on the basis of need
have and will continue throughout all future holiday periods, funded by Scottish
Government. In Argyll and Bute, the payment made is the equivalent of £3 per pupil
per day, paid by BACS transfer. 
Pupil feedback continues to be the basis for the development of school lunch menus,
and they continue to meet the revised Food and Drink in Schools standards which
came into effect in April 2021. 
Free school meal uptake remains higher than the Scottish average, though it has been
affected by changes to services due to schools utilising their dining halls and other
spaces differently during the pandemic. Most schools are now returning their lunch
service to pre-pandemic provision. 
In line with Scottish Government funding requirements, a programme of holiday food
and activities took place during summer 2021, and plans are developing for provision
during summer 2022. 
The Council’s Catering Service continues to hold its Soil Association Food for Life
Served Here Award at Bronze level, demonstrating its commitment to providing locally
produced, sustainable, ethical and locally prepared food, serving food that’s good for
pupil’s health, for the environment and for the local economy. 
Food cost inflation as a result of EU Exit, the pandemic and the war in Ukraine continue
to put significant pressure on both public sector food provision and on household
finances. 
Argyll and Bute Community Food Forum 
The Argyll and Bute Community Food Forum continues to operate
as a mutual support service for food banks across Argyll and Bute. 
Bute Advice Service provides the coordination role, bringing the
forum together as a collective of independent organisations.  The
Council supports the initiative which is a network through which
existing independent food-banks, food waste and community food
initiatives can share experience, advice and ideas. Their work is
closely linked to the Council’s Cost of Living and financial inclusion work, and officers
Page 349

Page 350

52 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
meet with representatives of the Community Food Forum on a regular basis, providing
support as required. 
Argyll and Bute Council are represented on the Scottish Government’s Working Group
tasked with developing ways of ending the need for Food Banks in Scotland. 
Foodbank Information
Kintyre
Foodbank
Kintyre Food Bank opens Tuesdays and Fridays from 10.30 -
11.30 or till all clients have been dealt with.  We gave out 271
parcels of about 4 carrier bags. depending on the number of
people in the families, sometimes considerably more, during 21st
April -22 March
We had 54 families.  We are noticing a huge increase in the
number of clients over the last 2-3 months.
The main problems families had was that the benefits they
received was not enough to cover food, heat, school uniforms,
clothes, shoes etc.
The food given by the council during holidays did help but quite
often it was not appropriate.  The main issues facing the food bank
last year was the constant need to fund raise, volunteer numbers
went down as people were either shielding or recovering from
Covid-19.  It is very distressing for us to witness the anxiety clients
feel that benefits don’t cover their needs. 
Bute Oasis Food bank is open 10-4 each day.  Numbers have doubled in the
last few months from on average 80 households per month to now
160 households.  75% are families; the remaining 25% are single
individuals, equally shared across the sexes.  The rise in food
prices is having a knock on effect on the cost of providing the
service.  Before price increases the average food spend for the
food bank was £1350, this has now risen to £1850 per month. 
Despite the challenges, the foodbank is able to support rising
numbers and provided over 100 households Xmas hampers and
the Easter event provided families a fun day out with face painting,
painting and decorating boiled eggs, sack races and hundreds of
chocolate eggs being given out.
Hope Kitchen Hope Kitchen support the Mull and Iona food bank, therefore stats
include both foodbanks.  In the period April 2021-Mar 22 1271 food
parcels were given out supporting on average 105 household each
month.  In April of last year 102 families were supported compared
to 155 in March of this year, indicating a rise in the number of
households struggling.  Where the reasons for using the service is
usually recorded as low benefits or low income, a rising number of
recipients are giving unexpected bills as their reason for using the
service due to the increase in fuel bills.  On average around 300
Xmas hampers are provided to families to support them at this
pinch point. A concern is the dropping number of contributions as
households have less to share with the community as they face
their own rising food and fuel bills.
Page 350

Page 351

53 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Tarbert Pantry Food hampers are given to an average of 50 families each week. 
Supplies are also given to the Multiple Sclerosis support service. 
Should anyone be in need support can be offered that day. As the
cost of living bites deeper many households are struggling to
manage on their restricted budgets and need support. 
Helensburgh &
Rosneath
Food Bank
Helensburgh & Lomond food bank serves those living within the
Helensburgh and Lomond Council Area boundary. We are an
independent community Foodbank run entirely by unpaid
volunteers and the majority of food distributed is donated by the
local community. We operate on a drop-in no referral necessary
basis. We are located at the Helensburgh Community Hub where
we have a donation drop off point and storage area. 
We are open for clients on a Monday from 10.00am until 12.00 and
Thursday from 3pm until 8pm.  We provide an outreach Foodbank
at the Howie Pavilion Rosneath on a Wednesday from 1pm until
3pm. 
During the period 1st April 2021 to 31st March 2022 we issued
2427 bags of food. Each bag provides a nutritionally balanced diet
for an individual or family for 1 week. We provide fresh fruit,
vegetables, cheese, eggs and bread as well as a selection of non-
perishable food items. The estimated cost of each bag £37.98p.
We also include a toiletry such as soap or toothpaste as well as a
toilet roll in each bag. 
Many of those who attend are single householders we do not
collect specific data on the number of families attending. During
the reporting period we supported 2940 adults and 823 children. A
total of 3763 were supported by the food bags provided. 
The primary problem facing families is low income making it
impossible to cope with food inflation, debt and high home heating
and energy costs. The loss of the £20 Universal Credit uplift in
October was particularly difficult for many. Since this was
withdrawn we have seen an increase in demand which is on-going.
We are seeing a marked increase in requests for help with home
energy costs. Many are at risk of self-disconnection as they have
no money to top up their prepayment key/cards. This trend is likely
to increase in the autumn. 
The main issue facing food banks is sustainability given the
increase in demand and likelihood of this upward trend in demand
continuing.
We compared the number of Bags Issued in the month March
2019 (pre-Covid-19) 170 bags with the number Issued in March
2022 it had increased to 260. An increase of 52.9%.  A 6%
increase in the cost of food and the high cost of home energy will
drive even more children into poverty. We are also seeing a drop
in donations as those who donate to the Foodbank are also seeing
an increase in their own living costs. We are having to purchase
Page 351

Page 352

54 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
additional food weekly to provide a well-balanced bag of food for
all who request help. In common with Foodbanks across the
country this additional demand is stretching the resources and
good will of those who donate, manage and volunteer at
foodbanks. 
We are grateful for the financial support for clients made available
via the Argyll & Bute Flexible Food Fund. Being able to signpost
clients to Bute Advice for a Benefits Review and Alienergy for help
with home energy is very helpful.  We also see the positive benefit
of providing cash first options for people via FFF and the school
holiday lunch payments. These initiatives afford families the dignity
of choosing and buying their own food ensuring it meets their
personal and cultural preferences. Previously we had to provide
additional food for children during the school holidays since the
introduction of the school holiday payment this has not been
necessary. 
Moving On
Mid-Argyll
Before April 2022 an average of 2/3 families would be supported
each week, since then this has increased to some weeks there are
8 households.  As the cost of living increases a rise in client need
is anticipated. Client can call directly or be referred in to the project
for support.
Solar Tiree
Foodbank
Food bank Opening Days and Times: by appointment, but visit on
Sunday afternoons 
Allocations of Food from April 21-Mar22: frozen food surplus from
the Coop and around £3000 in Coop vouchers 
No of families supported 8  
Primary problems facing families with children: Currently travel off
the island 
Has the lunch support from A & B Council over the holidays had
an impact on families (if you are aware): Yes, it was very helpful 
Main issues facing the foodbank in the last year: making contact
with potential clients and fundraising 
Dunoon
foodbank
Food bank Opening Days and Times
Thursday 4.30-6pm, Friday 10-12noon, Other times by
arrangement. 
Allocations of Food from April 21-Mar22
2500 food parcels; 1800 take away meals. 
No of families supported - 230 different clients. 
Primary problems facing families with children; School holidays,
meals and endless snacks. 
Has the lunch support from A & B Council over the holidays had
an impact on families (if you are aware); It has helped 
Main issues facing the foodbank in the last year; Food supplies
Page 352

Page 353

55 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
with supermarket shortages and restrictions on buying.  Higher
expectations - meals for 5 rather than 3 days; Premises restrictions 
Jeans Bothy
Helensburgh
A community hub project awarded “Community Project of the Year
2021” focussing on mental health and well-being offering a vast
array of support and interests including mindfulness sessions,
beach cleans, gardening, art classes etc., all in a bid to support
recipients.  As a part of that food parcels can also be issued.
Islay Food
Bank
Food bank Opening Days and Times - n/a We deliver in response
to email/texts/calls.  
Allocations of Food from April 21-Mar22 - 32 households received
parcels (most of them multiple occasions); 64 individuals including
10 children.  No of families supported -1 (5 parcels delivered over
the year).   
Primary problems facing families with children - separated father
struggling when he has his two boys staying; reduction in Universal
Credit stated as tipping point.  
Has the lunch support from A & B Council over the holidays had
an impact on families (if you are aware) - not known  
Main issues facing the foodbank in the last year - getting people to
use it; we know the need is there, but in a small community people
are reluctant to admit need. 
Good Food Nation and Food Strategy 
The Good Food Nation (Scotland) Bill is currently at stage two in the Parliamentary
process, and work has been underway over the past 12 months to ensure that the Bill
is designed to create a more sustainable food system for everyone in Scotland. Key
strands of the Bill are expected to deliver or support: 
A requirement for all Local Authorities and Health Boards to produce Local Food
Action Plans
National and Local Governments and Health Boards will need to write and consult on
plans every 5 years
Food insecurity is recognised, with a right to food either enshrined in this legislation or
clearly linked to other legislation to ensure that food produced in Scotland is
sustainable
A number of targets and designated functions should be identified 
Public Sector food is clearly identified as a driver for systemic change, and over the
past year, officers have been actively involved in discussions around the Bill and its
implementation, with the Council’s Executive Leadership Team up to date on the
current progress. Officers have given evidence and shaped the recommendations of
the Scottish Parliament’s Rural Affairs, Islands and Natural Environment Committee,
thus ensuring that the needs of rural communities are considered. Officers have also
Page 353

Page 354

56 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
presented at the Scottish Parliament’s Cross Party Group on Food about the impact
that the Bill will have on Local authorities and Health Boards, and attended the Day of
Action for the Good Food Nation Bill. 
It is expected that this Bill will become law during the course of 2022.  
In addition to this, the Scottish Government undertook consultation in December 2021
on the benefit of each Local Authority having a Local Food Strategy, which would cover
issues such as growing food locally, and local food procurement. Officers from Argyll
and Bute Council have been assisting in the development of this work, and have
responded to the consultation. 
With both of these legal requirements expected in the coming year, since January
2022 Commercial Services, Economic Development and Highlands and Islands
Enterprise have been working with a local consultant to develop the first ever Argyll
and Bute Food and Drink Strategy, with food insecurity, community wealth building
and public sector food being key components of that paper. This Strategy will be
published shortly. 
Bute Advice Service 
Bute Advice Centre staff and committee have been working extremely hard for
communities across Argyll and Bute in the last year.  Throughout the COVID pandemic
staff have worked from home, offering a comprehensive telephone service with
regards to Welfare Rights.  Staff have also supported clients who have been facing
financial difficulties with debt.  Staff remain motivated to deliver our mission statement
with the intention of “relieving poverty and distress”. 
Page 354

Page 355

57 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Argyll Community Housing Association Welfare Rights Service 
Bute Advice Centre is very proud to be responsible for the welfare rights arm of ACHA
in the Bute & Cowal region which supports tenants to maintain their tenancies through
welfare rights provision.  ACHA was able to tap into fuel vouchers for tenants through
the Housing Association Charitable Trust.  In the last financial year (Apr 21-Mar 22)
the client gain across all 4 ACHA regions was £4million+.  BAC staff work very closely
with local ACHA teams to target particular vulnerable groups who may need support,
e.g. supporting those of pensionable age to access pension credits.  Each week BAC
staff meet with area staff from Lomond, Oban & Lorne and the Isles, and Mid Argyll &
Kintyre, where updates on welfare reform issues are discussed and face-book posts
are created to keep tenants up to date with changes. 
Syrian Refugee Project 
Bute Advice Centre staff have worked closely over the last 6 years with families who
have come from Syria to make a new life on Bute.  For some families it was a place to
set down roots and make a home, for others it was a safe stepping stone to move on
with their lives to other places.  Staff are responsible for delivering all welfare rights
and money advice services to the families, with scheduled appointments every month. 
As families arrive an intense support package is offered, reducing as they settle in and
no longer need the same level of help. 
Advice Book 
In May 2022 a small book with advice and information around welfare rights, money
advice and energy advice was distributed across the region to support those struggling
on tight budgets.  Priority was given to those using foodbanks. 
Free Period Products 
In November 2021, Argyll and Bute Council appointed a Project Lead – Period
Products to ensure that the consultation, launch, roll out and compliance required by
the Period Products (Free Provision) (Scotland) Act 2021 was achieved. Argyll and
Page 355

Page 356

58 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Bute is the first Local Authority area to specifically recruit a post to support this work.
During the early part of 2021, the post holder undertook considerable consultation to
develop a Statement on Exercise of Functions, a brand identity and a provision and
launch plan, with consultation being done with both young people and adults across
communities. 
Work is underway to ensure that the new statutory duty will be achieved by 15th August
2022, with a timeline as follows: 
Products remain available in a range of public buildings as identified on the Pick Up
My Period App, as well as continuing to be available online: 
Page 356

Page 357

59 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
https://www.argyll-bute.gov.uk/sanitaryprovision
It is interesting to note that over the past 12 months, more reusable products have
been provided to people in Argyll and Bute than disposable products, which is in line
with the original sustainability aspirations of the project. 
School Clothing Banks  
We have great engagement between schools and community groups in Campbeltown
where the Council is working with the schools, Kintyre Recycling Limited Shopper Aide
to implement a school clothing bank to cover 6 primary schools and a secondary
school in South Kintyre. 
There has been positive engagement in both Dunoon and Rothesay and it is
anticipated that Sustainable Use School Clothing Banks will be setup by June 2022 in
all of these areas. 
The GRAB Trust (Group for Recycling in Argyll and Bute) 
The GRAB Trust are offering free ‘sew your own’ period pad workshops. These are to
be held monthly across Argyll to support and enable communities to take control of
their own cycle by providing information and practical skills to sew their own reusable
period pad, using refurbished sewing machines. There will also be opportunities at
each workshop to learn more about reusable period products and how they can benefit
their health, the environment and finances. 
ReStyle Argyll 
ReStyle Argyll is a collaboration of four partners to bring quality re-used furniture to all
areas of Argyll & Bute.  They offer a collection service for donated household furniture
and white goods. ReStyle Argyll have a Zero Waste ethos, items that need major
repairs or refurbishment will be sent to a ReUse & RePair Hub.  ReStyle Bute, 100
Montague Street, Rothesay, Isle of Bute 
The objectives of this social enterprise are to:
• Improve environmental sustainability
• Support training, skills development and relieve unemployment
• Fyne Futures operate a number of activities including:
• Recycling (kerbside and bring site collections, processing and onward sale to
market)
• Car Club (providing affordable and sustainable access to vehicles for individual
and corporate members)
• Bute Produce (affordable fruit and vegetables, training in horticulture and
heritage varieties)
• Restyle (collection of unwanted furniture and sale of affordable reuse furniture,
with local delivery) 
LORI, Oban, Moleigh Recycling Site, Ariogan, Oban, Argyll 
Page 357

Page 358

60 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Lorn and Oban Reuse Initiative (LORI) opened to the public in 2009, now part of The
GRAB Trust, whose aims are to: 
• Divert and reuse furniture and other household objects before they reach the
waste stream.
• Provide volunteer job and training opportunities for the long-term unemployed
and community service offenders.
• Provide low cost furniture to the homeless to furnish their new property at 50%
discount on normal prices. 
Kintyre Recycling, 67 Glebe Street, Campbeltown, Argyll 
Kintyre Recycling Limited provides recycling services to the Kintyre peninsula. By
operating as a social enterprise, Kintyre Recycling provides employment to people
with special/social needs and learning disabilities.
Kintyre Recycling has two main objectives:
• To provide employment to persons with special needs and learning difficulties.
• To provide waste management services and access recycling facilities to a
disadvantaged area in Argyll + Bute by operating as a social firm. 
Re-Jig, Unit 11, Whin Park, Bridgend, Isle of Islay 
The core objectives of the company are:
• to reduce landfill on Islay and Jura,
• to protect the natural environment,
• to reuse as much resource as possible
• to create long term employment in the local community. 
ReStyle Argyll supports development in skills for volunteers, work-based trainees and
seeks to create sustainable employment. 
D. Helping Families in Other Ways 
Infant and Perinatal Mental Health Services  
The infant and perinatal mental health service has been developing since late 2021.
We now have a Perinatal Mental Health Nurse and Parenting and infant Mental Health
therapist in post, supported by "champions " in  Health and 3rd sector, who are
assisting in raising awareness and doing training across the HSCP. See below from
most recent progress report 
"PNMH & IMH will work together around families and community. Perinatal Mental
Health (PNMH) nurse led team will accept referrals directly from primary care,
maternity and health visiting professionals, as well as other mental health services
including Community mental health and Crisis teams. Relationships and support will
be developed with the north of Scotland PNMH leadership resource. The service will
continue to work with colleagues in the Levendale MBU and regional support once in
place. 
Page 358

Page 359

61 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
The service is built on the foundations of Children and Families in Argyll and Bute
which brings together the core universal services of Maternity and Health visiting
around the child .GIRFEC is well embedded in the family pathway and services are
integrated around the family in their community. All women have a primary midwife
and continuity of carer is above 75%. There are close links with the CMHT and social
work with local support from addictions in localities. Primary mental health teams are
linked to services and electronic CBT and text base service are promoted
(silvercloud). 
Face to face and virtual parenting groups exist and one to one care is provide with
TEC available to support. There are two nurturing and parenting support workers
currently being developed into roles to support early intervention. Regular clinical
supervision is undertaken across the HSCP using teams. A strength based approach
to care starts with the wellbeing tool in the antenatal period within the wider GIRFEC
family pathway. 
The Service objectives are to develop: 
• Capacity to assess and case manage women with new or pre-existing
moderate to severe mental illness occurring in the perinatal period; 
• Pre-conception assessment service; 
• Assessment and facilitation of mother-infant relationship in context of maternal
mental illness liaison to maternity services. 
Maternity Teams have attended "Money Counts" training run by A&B Council to
develop a broader understanding of services available and how to refer and access.
Maternity Services have remained an essential service throughout the pandemic so
this has ensured support, advocacy and continuity for our families in A&B. 
Youth Work Education Recovery Learning Programme 
The Community Learning Service is listening to Young People and their concerns
around returning to school/education during COVID-19 and the impact this was having
on their health and well-being. We successfully accessed funding from the Youthwork
Education Recovery fund to provide activities that enabled us to address some of
these issues and to support young people to return to or remain engaged in their
education and learning provision. 
Youth workers have been able to provide youth work and outdoor learning in 8 of the
10 high schools in Argyll. 1 other high school had the outdoor learning element of the
project, this was due to Covid restrictions on travelling to Island communities. This
funding provided the opportunity for coordinated youth work support across Argyll. The
support was targeted and worked with those young people schools had most concerns
about due to the impact of Covid. At least 90%of the young people participating weren’t
known to the Youth workers and this has led to increased youth work support for them
as well as supportive relationships with new peer groups. The Youthwork partnership
with Hebridean Pursuits gave 99 young people the opportunity to use outdoor learning
as a way to explore their Health and Wellbeing as well as build on current or news
skills. Most young people will have accessed outdoor learning previously, however
Page 359

Page 360

62 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
rarely, with youth work support, this has enabled transferring of skills and learning
across context’s including school and family life. Different outdoor learning
experiences offered opportunities for personal and learning skills development in
areas such as communication, problem solving, and information technology, working
with others and thinking skills. 
Key outcomes 
• 99 young people participated in the programme.
• Awards/accredited qualifications gained included 45 SQA Health and
Wellbeing, 23 Dynamic Youth Awards and 14 Hi5 awards.
• Key stakeholders have identified increased confidence and skills in
participants. They have seen improved health and wellbeing and an awareness
of and ability to seek support where required. 
• Evidence of increased attendance at school, positive engagement with learning
and with peers in school and at home. 
• Increased attainment through recognition of wider learning and achievement.
• Outcome star was used to monitor learner’s journeys in key areas, the figures
below show percentage of learners who reported progress: 
47% - making a difference 
46% - Hopes and Dreams 
80% -Wellbeing 
53% - Education 
40% choices and behaviour 
47% in 3+ outcome areas
93% in 2+ outcome areas 
100% 1+outcome areas 2.9 average number of areas showing progress 
82.8% achieved accredited qualification 
Youth Voice/Participation 
Youth Participation continues to be a priority for the Community Learning service.
Article 12 of the UNCRC states it is a right that children, as embodied in the Lundy
model, have the space to express their views; their voice is enabled; they have an
audience for their views; and their views will have influence. We have a number of
initiatives we will be supporting this year including. 
Scottish Youth Parliament 
We are supporting our 3 newly elected Members of the Scottish Youth Parliament to
represent Argyll and Bute’s young people at the Scottish Youth Parliament and on
local strategic forums including the Community Planning Partnership. The MSYP will
be conducting an Argyll wide roadshow to engage/consult with young people to identify
their priorities and to represent these views locally and nationally. 
Youth Action Groups (YAG) 
Page 360

Page 361

63 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
After a youth led consultation we are relaunching/rebranding the youth forums to
become Youth Action Groups. We are supporting the development of 6 YAG across
Argyll. 
There are three key aims for these groups: 
1. To deliver an informal youth work activity that will support recruitment,
engagement and relationship building. 
2. To develop youth participation through a programme of personal development
and capacity building opportunities for young people. 
3. To provide social and recreational activities 
YAG should be a safe space where young people have fun, build relationships and
explore issues relevant to them and their communities. They will provide a focal point
for the delivery of locality based personal development and capacity building
opportunities for young people. They will consult with young people on their interests,
needs and how they want to respond to those needs. 
To support young people to engage and participate meaningfully we will be running a
training programme twice this year for 120 young people. They will attend a training
weekend at Ardroy Outdoor Centre where the local Members of the Scottish Youth
parliament along with Youth workers will provide Youth Participation Training. 
Northern Alliance/Argyll and Bute’s Children Committee 
We are supporting young people to lead and participate in the Regional Improvement
Collaborative Youth Advisory Group and Argyll and Bute Children’s Youth Advisory
Panel. MSYP are involved in both of these forums and continue to influence their
priorities for supporting young people in Argyll and Bute and across the 8 Local
Authorities in the Northern Alliance. 
What are Carers Centres and MAYDS doing to support Young Carers in Argyll &
Bute? 
Just over 500 young carers are currently being supported by Carers Centres in Cowal
& Bute, Helensburgh & Lomond and North Argyll, whilst Mid Argyll Youth Development
Service (MAYDS) offers educational and recreational services to young people in Mid
Argyll. 
Young Carers services provide support to unpaid young carers and their families from
the age of 5 (with the exception of North Argyll who support young carers from 8
years). 
Carers Centres & MAYDS are contracted by Argyll & Bute HSCP to undertake Young
Carers Statements under the Carers (Scotland) Act 2016 on behalf of Argyll & Bute
HSCP. This helps to identify how Young Carers feel about their caring roles, what
young carers are doing in their caring roles and what support they need.
Carers Centres and MAYDS apply for charitable funding through organisations such
as; The BIG Lottery, Comic Relief, Children in Need, Robertson Trust, Shared Care
Scotland and the Army Covenant to provide a break from caring and support for young
Page 361

Page 362

64 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
carers. In addition Carers Centres and MAYDS take opportunities to maximise their
funding through charitable and community grants providing young carers with therapy
and counselling, vouchers for activities, assistance and help towards food and fuel
costs and other items. 
Each Carers Centre and MAYDS are slightly different but may provide the following
supports and services: 
Young Carers Statements  Emergency Planning Advocacy
Therapy/Counselling  After School Groups School Drop ins
Homework Clubs   Signposting/Referrals Saturday Activities
Holiday Activities   Trips    Residentials 
One to one support   Training & Information 
During the Covid-19 Pandemic, Carers Centres and MAYDS provided Young Carers
and their families with help in accessing food and prescriptions, Young Carers and
their siblings were delivered activity packs, provided with laptops, iPads and tablets to
maintain contact with peers, supports and access education. 
A number of Young Carers and families were given supermarket vouchers, electricity
top up and help towards living costs. This period meant Carers Centres and MAYDS
adapted to providing Young Carers with a break from caring in a different way, moving
from school support, physical groups and activities. Support was provided by
telephone, online group sessions and one to one’s, and doorstep visits. 
Activity packs, games, equipment (indoor and outdoor) and a range of items – were
sourced to provide Young Carers with an alternative break from caring. As lockdown
restrictions eased, Young Carers where identified, were provided with therapy and
counselling responding to individual need. 
As a result of funding sourced by the Carers Centres and MAYDS during the
Pandemic, a number of Young Carers and their families were provided with various
items, for example; TV’s, Games Consoles, Cookers, Sewing Machines, Garden
Sheds, as well as, shopping vouchers and assistance with fuel costs. Centres are
aware of families that are continuing to struggle and are helping to meet this need
alongside signposting to appropriate partners. 
Transforming Responses to Violence against Women and Girls 
In September 2021 the Argyll and Bute Violence Against Women and Girls Partnership
gained £68,857 from the Developing Equally Safe Fund for a Project aimed at
transforming the responses to violence against women and girls.  This will run over a
two year period and take the form of a number of training and service development
events that will improve services to women, and other victims, of domestic abuse. 
Staff skills and confidence will be improved through the delivery of training such as
Routine Enquiry, Working with Men and Domestic Abuse Awareness Raising.  In
addition a research project will be carried out to capture the views and ideas of lived
experience women and of staff.   
Page 362

Page 363

65 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
A major part of this project will be the start of a roll out of the Safe and Together Model
across Argyll and Bute.  The aim of this is to improve practice and create better
outcomes for children and families exposed to domestic violence.  Key principles of
the model are:   
1.Keeping safe and together with the non-offending parent (safety / healing from
trauma / stability and nurturance).
2. Partnering with non-offending parent as de-fault position (efficient / effective / child
centred).
3. Intervening with perpetrator to reduce risk and harm to the child (engagement /
accountability / courts).
For more information go to https://safeandtogetherinstitute.com
It is hoped that these changes in services will help to keep children out of care and
with the non-offending partner.  These changes marry up well with the whole family
approach of The Promise and offer supports that will benefit children and families. 
Free School Meals Delivered by Drones  
Pupils in remote parts of Argyll and Bute could soon have their school meals delivered
by drone.  In a UK first, Argyll and Bute Council is teaming up with leading drone
specialists Skyports to trial the use of Unmanned Aerial Vehicles (UAVs) in delivering
school meals.  Flying from Oban Airport, the trial involves delivering meals freshly
prepared in Park Primary School in Oban to Lochnell Primary, which is 1.5km away. 
Argyll and Bute is Scotland’s second largest local authority with 23 inhabited islands,
the most of any UK authority. While the majority of schools have kitchens on site
preparing meals, the provision of school meals to some rural and remote schools
currently relies on traditional methods of transport including vans, taxis and ferries,
which can be affected weather conditions. 
The use of drones would help the council to deliver meals to all remote and island
schools reducing current delivery times and costs, and help contingency planning in
emergencies. The drones also offer an alternative carbon free mode of transport, as
they are fully electric.  The trials are part of plans for the council to create an
Unmanned Aerial Vehicle (UAV) Innovations logistics Hub at Oban Airport. The council
received £170,000 of UK Government Community Renewal funding to create a
detailed planning application with full design and costings in order to bid to the UK
Levelling Up Fund.  New funding will enable the construction of the hub by March
2025.   
Universal Pathway Quality Improvement Collaborative Financial Inclusion Practicum
(UPQIC) 
Background -  In our last review we informed that In October 2019, teams, consisting
of money advisors and Health Visitors from across Scotland came together to work
with Improvement Advisors from the ‘Children and Young People Improvement
Collaborative’. The aim was to implement or improve the processes already in place
in relation to financial inclusion discussions between Health Visitors and families as
part of the Universal Health Visiting Pathway, referring them for financial advice where
required. The project originally commenced in October 2019 and was due to finish in
Page 363

Page 364

66 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
2020 however, due to the Covid-19 pandemic, the project was put on hold until
January 2021, when work was able to re start. The team from Argyll and Bute consists
of 2 Health Visitors from Bute and Cowal, and Bute Advice Service. They have
developed a referral pathway between the services, where Health Visitors refer
families directly to Bute Advice for further advice and support. 
Project Aim: ‘By September 2021, Health Visitors in Argyll and Bute (Bute & Cowal),
will have a financial discussion with parents at 80% of contacts on the Health Visiting
Pathway, and where a need is identified 100% will receive the requested money
advice and benefit support’.  From January – May 2021 in conjunction with Bute Advice
Centre the Health Visitors in Bute developed a financial referral pathway which allows
them to directly refer families with ‘money worries’ into the local money advice service
(Bute Advice). This has provided a single point of contact for families to a money
advice service.  Client financial gain has been significant having been supported
through access to The Flexible Food fund and ALIenergy. 
It was hoped that by 2022 the Financial Referral Pathway and the learning from this
project would have been implemented in other areas in Argyll and Bute.  However due
to staff shortages and other issues this has not proven possible.  It is hoped that
development of the Financial Referral Pathway will be taken forward once these issues
have been resolved.   
Flexible Fund - Support for Vulnerable People affected by tier 4 lockdown 
In June 2021 the Council agreed to support a total of 20 projects using funding
provided by the Scottish Government to support vulnerable people affected by tier 4
lockdown in relation to Covid. 
During the year the projects have delivered; 
• Poverty Awareness Training delivered by the Poverty Alliance to 220 staff
across the Council and its community planning partners. Participants described
the course as informative, thought provoking, eye-opening and enlightening
(See section on Training in this report).  A full report on outcomes will be
delivered to the Council’s Leadership Team and plans to take actions related
to the feedback will be made from there. 
• School Clothing Banks (SCB), proposal is to have a sustainable use school
clothing bank available across Argyll and Bute by December 2022. Plans are
moving quickly in Campbeltown, Rothesay and Dunoon at present and SCB will
be established in advance of the new school term in August 2022. 
• School Clothing Grant Top-Up of £75 per eligible pupil was paid out in January
2021. A total of £128,000 was issued to 1,711 children to help provide them
with money for clothing over the winter period. 
• Grant funding of £10,000 was provided to Women’s Aid and Rape Crisis
support agencies given the increases in customer contact through the
pandemic.
• Funding of £20,000 was provided to support young carers groups throughout
the pandemic. 
Page 364

Page 365

67 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
• Computer hardware and Wi-Fi networking works of £10,000 were undertaken
in facilities where people with physical and learning disabilities and suffering
from mental health issues where seeking support.
• Grant funding of £30,000 was provided to village halls and wide community
groups and organisations that were supporting vulnerable people throughout
the pandemic
• Vulnerable adults and victims of telephone fraud were given call screening kits
and support from Police Scotland to ensure that they were safe and protected
in the future from scammers. The value of this support was £10,000.
• Funds of £40,000 were awarded for support groups of vulnerable people
affected by addiction and substance misuse. 
• Care experienced young people were supported with £39,750 used to grant
gym and leisure memberships to help improve physical and mental health and
driving lessons and provisional licences to improve inclusion and employability. 
• Support for groups and classes in community venues and visits to people at
home if they could not manage to get to the gym for those who have reduced
confidence and ability to socially engage for various functional and
psychosocial reasons. This includes the use of Physiotherapy at a total cost of
£65,000.
• Grants of £85,000 were made to meet the increasing cost of energy and
mitigate fuel poverty with £50,000 of this for those suffering from Cancer and
other serious conditions. 
E. Other Planned Work 
Rural Growth Deal 
The Rural Growth Deal (RGD) will deliver £50 million of investment from the Scottish
and UK Governments with Argyll and Bute Council and key stakeholders seeking to
contribute at least £20m of additional match funding in order to accelerate inclusive
economic growth for the region.  The next key milestone for the RGD will be signing
the full deal agreement at which stage funding will start to be drawn down and projects
delivered.  Given the focus on inclusive economic growth, projects will also require
integrated impact assessments to be undertaken as part of the approvals process.  An
Equalities Steering Group has been established for the RGD and the RGD Programme
Management Office are also represented on the Council’s Equalities Forum. 
The RGD proposals are designed to deliver success across Argyll, based on three key
drivers: 
Connecting: our high value business sectors with national and international business
markets; our local economic successes with national strategic priorities 
Attracting: additional skills, training and learning opportunities; new residents, visitors
and businesses 
Growing: doing more of what works; making more of our natural and built resources
Page 365

Page 366

68 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
The deal will also be a key part of the Covid-19 recovery plan for the region by
providing critical infrastructure and financial support which will accelerate the recovery
of local sectors.
The RGD includes the following 8 key investment themes:- 
Tourism – Creating a World Class Visitor Destination - proposal is to open up
access to Argyll’s coasts and waters to develop Argyll as a West of Scotland “must
visit” location for the maritime leisure market;
Creating a Low Carbon Economy – Explore options for the decarbonisation of Islay
using a ‘whole systems’ approach that will consider power, heat and transport as well
as placing the needs of the individual and business consumer at its centre to ensure
that future energy systems are sustainable and support inclusive economic growth; 
Rural Skills Accelerator Programme -Inclusive Growth lies at the heart of City
Region and Growth Deals and this Deal will drive future inclusive economic growth
and tackle inequality with a strong focus on community wealth building, STEM skills,
rural enterprise and the delivery of local education services. The Rural Skills
Accelerator Programme is a vehicle that will provide the 21st century infrastructure
and delivery mechanisms needed for skills, training, education and enterprise to
facilitate collaborative growth in the rural economy. ; 
Housing to Attract Economic Growth - The housing element of the Rural Growth
Deal proposes to provide affordable housing of the right type and in the right place to
support growing business sectors; 
Clyde Engineering and Innovation Cluster - Through the Rural Growth Deal Argyll
and Bute Council is seeking to maximise the local and national benefits of the Ministry
of Defence £1.3bn Maritime Change Programme.  The focus is on providing bespoke
commercial and businesses accommodation proximate to the base as well as
enhanced innovation and skills infrastructure; 
West Coast UAV Logistics & Training Hub - This intervention involves working in
partnership with industry leading research institutions to create an innovative research
and development centre for unmanned aerial vehicle (UAV) technologies on the west
coast of Scotland. This will create the West Coast of Scotland’s first dedicated drone
training centre with indoor facilities specialising in developmental, test and operational
facility for UAV technologies.  This facility could enhance the provision of services to
local island communities following on from successful pilots working with NHS
Highland and the Royal Mail.  Another potential use being considered is delivery of
school meals to remote and island schools; 
Argyll - Digital Connectivity – This project aims to digitally future proof all RGD
investments focusing on the provision of gigabit capable broadband and enhanced
mobile connectivity in rural areas; 
Marine Aquaculture Programme – This is a programme of projects aimed at making
Argyll and Bute the leading region for innovation in marine aquaculture in Scotland,
UK and globally, by underpinning sustainable, inclusive business growth through
investment in world-class marine science and technology. 
Page 366

Page 367

69 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Given that the RGD is not yet in the delivery stages, the impact on child poverty will
have been limited to date however, there are projects that could have positive impacts
moving forward.   
A key focus of the Creating a Low Carbon Economy project is helping to reduce high
levels of rural fuel poverty.  This is likely to include improved energy efficiency
measures in local housing stock to try and reduce energy consumption / costs.  The
RGD funding will also seek to provide additionally to existing energy efficiency
schemes to maximise the funding available.
The RGD housing project is focused on providing affordable housing with a mix of
tenures required to support local people and workers in some of our most rural
communities.  Housing will also be constructed to be as efficient as possible to reduce
energy costs and we aim to ensure that potential sites are located close to local
amenities to reduce the requirement for travel.   
Digital inclusion is a key driver behind our RGD digital project. We will look to enhance
digital connectivity across the region and facilities such as the STEM hubs may also
include community spaces which will be fully digitally connected.  We are investigating
the potential to utilise fibre and 5G connectivity to provide immersive, interactive
learning environments for local school children.  We will also try and maximise
community benefits from any digital investment via the RGD. 
The Rural Skills Accelerator Programme includes a focus on providing enhanced
STEM education for local school children which will be delivered via a series of
physical STEM hubs and associated outreach activity to ensure all local schools can
benefit from this.   
A key focus of the wider RGD programme will also be growing local skills, training and
job opportunities in growth sectors such as the blue economy, defence and
tourism.  We will invest in key infrastructure such as a new Marine Industry Training
Facility at Dunstaffnage, commercial and innovation space serving the expansion of
HMNB Clyde, enhancing UHI Argyll College’s estate in Dunoon and a series of STEM
Hubs across the region.  We will also be undertaking a series of marine tourism and
place based regeneration projects that should enhance infrastructure in a number of
our key coastal towns and villages.  This will include measures to improve civic pride
by providing enhanced community spaces, new active travel links and associated
employment opportunities (e.g. linked to growth in tourism, construction, apprentices
etc.) 
Local Authority Covid-19 Economic Recovery Fund (LACER)
In April 2022 the Council approved a range of options to support local economic
recovery and cost of living impacts on low-income households.
The following suite of options were agreed and are being implemented this financial
year 2022/2023. 
Issue Scotland Loves Local Cards to Households in Receipt of Council Tax
Reduction (CTR).
Cards of a value of £120 will be issued to around 6,500 CTR recipients in June 2022 
Page 367

Page 368

70 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
Support for the Gypsy Traveller Population with Food and Fuel Costs
Funding of £10,000 has been provided to Minority Ethnic Carers of People Project
(MECOPP) to engage with Gypsy Travellers to review the cost of living challenges
faced by the group given factors such as their remote rural location and the facilities
available to the for their everyday living.  Costs for engagement activities and food and
fuel vouchers will be met by the fund. 
Working with the third sector to provide additional fuel poverty advice and support
the increased demand due to the cost of living crisis. 
A total of £130,000 to support the increased demand for advice services and to top up
funding for fuel vouchers to give to those most in need of support with energy bills.
This covers the provision of £40,000 each to Argyll Lomond and the Islands Energy
Advice group, Bute Advice Centre and Argyll and Bute Citizens Advice Bureau to
support them with the increased demand due to the cost of living crisis. In addition the
provision of an additional £10,000 to the Fuel Bank Foundation to cover the cost of
fuel vouchers for vulnerable people. 
New Enterprise Support Grant 
£120,000 fund to help new businesses start up and become established. Monies to
assist up to 40 new businesses start up and become established in our area. 
Small Business Development Grant
£200,000 allocated to help existing micro and small business improve their resilience
or growth assisting them to:
• implement green initiatives e.g. change packaging;
• implement digital development e.g. improve their website;
• implement marketing improvements e.g. advertising and trade fairs;
• improve efficiency and innovation e.g. capital equipment. 
Argyll and Bute Shop Local Card
£40,000 funding to continue the card scheme for another two years and also increase
marketing and uptake. This is money on cards that can only be spent in Argyll and
Bute thus boosting our local economies. 
Sector Specific Support Grant for Businesses
£150,000 to implement projects that contribute to the sector as well as benefitting
businesses e.g.
• Tourism and hospitality – support businesses with a project that improves visitor
experience and facilities. Cafes that improve their seating and outdoor facilities.
• Food and drink, new product development grant to support testing, packaging
and labelling to target new markets. 
• Retail. Support retailers moving into an empty shop.
• Regional support for additional specialist advice and tailored grants to support
businesses in hard hit areas with higher than average unemployment.
• Support the increased demand due to the cost of living crisis. 
Child Poverty Group:
In the coming year the Argyll and Bute Child Poverty Group will:
• Deliver more training to staff, young people and other stakeholder groups;
Page 368

Page 369

71 
Argyll & Bute Child Poverty Action Plan Review 2021-2022
• Form a Communications and Engagement Group and further develop these
areas of work;
• Use child poverty and related data to identify people and places where support
requires to be focused;
• Link to the work that will be happening both locally and nationally, to embed the
UNCRC and children’s rights into law, good practice and public awareness. 
Page 369

Page 370

72 
Argyll & Bute Child Poverty Action Plan Review 2021-2022 
This report was produced by
the Argyll & Bute Strategic
Children’s Group.
For more information contact:
mandy.sheridan@argyll-bute.gov.uk 
Page 370

Page 371

Fuel Poverty Rates and Extreme Fuel Poverty rates March 2022 Cowal and Bute 
Dunoon 
Isle of Bute 
Cowal   
Source: Home Analytics 3.7.2  March 2022. 
Key 
No 
Yes 
Page 371

Page 372

Fuel Poverty Rates and Extreme Fuel Poverty rates March 2022 Helensburgh and Lomond   
Helensburgh Central 
Helenburgh and Lomond 
North Lomond 
Source: Home Analytics 3.7.2  March 2022. 
Key 
No 
Yes 
Page 372

Page 373

Fuel Poverty Rates and Extreme Fuel Poverty rates March 2022 Mid Argyll Kintyre and
Islay 
Kintyre and the Isle 
South Kintyre 
Mid Argyll 
Source: Home Analytics 3.7.2  March 2022. 
Key 
No 
Yes 
Page 373

Page 374

Fuel Poverty Rates and Extreme Fuel Poverty rates March 2022 Oban Lorn and Isles 
Oban North and Lorn 
Oban South and Isles 
Source: Home Analytics 3.7.2  March 2022. 
Key 
No 
Yes 
Page 374

Page 375

ARGYLL AND BUTE COUNCIL                  COUNCIL 
DEVELOPMENT AND INFRASTRUCTURE        29 SEPTEMBER 2022 
EXECUTIVE ACTIONS – NATIONAL POWERBOAT CHAMPIONSHIPS, DUNOON 
1.0 EXECUTIVE SUMMARY
1.1 The Council’s Constitution gives specific delegations to the Chief Executive and
Executive Directors in accordance with Section 3 Part C paragraph 3.2.5. This
provides the Chief Executive and Executive Directors of Service the power in an
emergency situation to take such measures as may be required to enable the
Council to respond to an emergency situation, subject to advising as appropriate
(a) the Leader, (b) the relevant Policy Lead, and where the emergency is likely
to affect significantly a particular part of the Council’s area (c) the Chair of the
relevant Area Committee and (d) Ward Councillors, reporting to the Council as
soon as possible thereafter, on any items of expenditure for which approval
would normally be necessary. This provides a basis for any urgent decisions
which require to be made in response to an emerging situation. 
1.2 This report advises the Council of a situation in recent weeks where such
measures have required to be invoked subject to appropriate consultation. 
Page 375 Agenda Item 18

Page 376

ARGYLL AND BUTE COUNCIL                  COUNCIL 
DEVELOPMENT AND INFRASTRUCTURE        29 SEPTEMBER 2022 
EXECUTIVE ACTIONS – NATIONAL POWERBOAT CHAMPIONSHIPS, DUNOON 
2.0 INTRODUCTION
2.1. The purpose of this report is to highlight the use of emergency powers by the
Executive Director of Development and Infrastructure Services, to facilitate the use
of the Coal Pier Car Park in Dunoon from 9th to 11th September 2022.   
2.2. Having regard to the Constitution and, as there was insufficient time for a report
to be taken to the Council for approval, the Executive Director of Development
and Infrastructure Services consulted with the Council Leader, the Policy Lead,
the Chair of the relevant Area Committee and Ward Members to seek their views
and agreement on whether the fees for the use of the car park should be waived
for the specified period of time to enable the National Powerboat Championships
to go ahead.   
3.0  RECOMMENDATIONS 
3.1 It is recommended that the Council notes the decision made by the Executive
Director regarding the Fees and Charges in relation to the event, and having due
regard to the Council’s Constitution in terms of the use of emergency powers.   
4.0 DETAIL
4.1  The National Powerboat Championships normally hold their annual event at the
Holy Loch, however are unable to do so this year due to another event taking
place. 
4.2  Argyll and Bute Fees and Charges places a duty on the Council to charge for
the use of any car parking bays.  The use of the Coal Pier Car Park in Dunoon
would incur a cost of £9 per bay, per day, totalling over £900 for the period of
time the Group sought to use the car park for.  It should be noted that the
charging policy for this car park is 0900 hours to 1800 hours, Friday to
Saturday, with Sunday free.    
4.3  An urgent decision was necessary with regards to the level of charging, taking
into account the potential loss of income for the specified period of time.  To
provide support for the event and promote a wider economic benefit to the town
Page 376

Page 377

of Dunoon, it was considered reasonable to waive the charge on this occasion.    
5.0 CONCLUSION
5.1 In accordance with the arrangements outlined in Section 3 Part C paragraph
3.2.5 of the Council’s Constitution, the Council is invited to note the
circumstances and decision with regards to the exercise of emergency
provisions for waiver of arrangements of Fees and Charges for the National
Powerboat Championships at Dunoon.  This decision was subject to
appropriate Elected Member consultation as outlined within this report. 
6.0 IMPLICATIONS
6.1 Policy – emergency/urgency provisions put in place in accordance with
arrangements within the Council’s Constitution.   
6.2  Financial – associated costs are absorbed within existing departmental
budgets.   
6.3  Legal – application of the powers delegated to officers within the Council’s
Constitution.   
6.4    HR – none known.   
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – It is not anticipated that any of the
recommendations in this report will have a potential negative impact on any
particular group or discriminate on the basis of age, disability, gender, race,
sexual orientation, pregnancy and maternity or religion and belief. 
6.5.2  Socio-economic Duty – none known.  
6.5.3  Islands – none known.   
6.6 Climate Change – none known.     
6.7  Risk – none known.   
6.8  Customer Service – the arrangements put in place by the Council supports
customer service for those attending the event.   
Executive Director with responsibility for Development and Infrastructure,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
August 2022 
For further information, please contact:- 
Jim Smith, Head of Roads and Infrastructure Services Jim.Smith@argyll-bute.gov.uk 
Hugh O’Neill, Network and Standards Manager Hugh.ONeill@argyll-bute.gov.uk            
Page 377

Page 378

This page is intentionally left blank

Page 379

ARGYLL AND BUTE COUNCIL                                          COUNCIL 
EDUCATION/ 
COMMERCIAL SERVICES                                                           29 SEPTEMBER 2022 
LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) UPDATE
POTENTIAL BID FOR NEW MULL CAMPUS 
1.0 EXECUTIVE SUMMARY 
1.1 The Learning Estate Investment Programme (LEIP) is the Scottish Government’s
flagship programme for investment in education and is now into Phase 3.  It is
the successor to the ‘Schools for the Future’ programme which our Council has
delivered new builds or substantial refurbishments across our education estate
at Oban, Kirn, Dunoon and Campbeltown.  Our Council has not applied for
previous phases of LEIP and there has been encouragement for a Scotland wide
engagement with the programme. There is currently no assurance there would
be a subsequent phase of LEIP or prioritised funding for education in future years
of this parliament until 2026.   
1.2 The Scottish Government has recently clarified the timescales and application
process for LEIP Phase 3 and this report aims to update Council where our team
are with the development of a bid for this nationally competitive fund and seek
the appropriate financial and political commitment to proceed with submission in
October.  It also seeks to update on engagement recently taken place with our
education staff, stakeholders and communities that will assist our bid and inform
the next steps of the application process should we progress to the next stage
following backing from the Scottish Government.  This pre-engagement which is
a non – statutory process has been valuable in identifying early issues,
communities to engage with at future consultations and test methods of
communication.   
1.3 The Council’s Learning Estate Strategy (adopted November 2021) has identified
the priorities in terms of education new build are focussed on delivery of new
campus opportunities on our islands of Mull and Islay based on the assessed
fabric condition and learning suitability.  Of these two locations, Mull is our
preferred bid for LEIP funding and top priority based on a number of suitability
criteria, most notability the current suitability of our current estate in Tobermory. 
Given that LEIP will only fund up to 50% of construction costs with remainder
having to be resourced by Council or other sources it would be unaffordable to
progress with 2 bids at this current time.  Furthermore, given the nationally
competitive nature and likelihood of oversubscription to this fund we are also
looking to consolidate with a single unified bid for Mull – rather than twin tracking
multiple applications.   
1.4 Given the financial scale of the ask, which will be measured in several tens of
millions of pounds to the Council, and clear political commitment it is essential
Page 379 Agenda Item 20a

Page 380

there is a mandate by Council to progress with a bid of this scale and significance. 
To this extent, a clear direction is requested from Council on where to make a
LEIP bid submission by the deadline date of 31st October 2022, or not.  The full
application will continue to be worked on up to submission date but a draft is
contained at Appendix D. 
ARGYLL AND BUTE COUNCIL                                               COUNCIL 
EDUCATION/ 
COMMERCIAL SERVICES   29 SEPTEMBER 2022 
LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) UPDATE
POTENTIAL BID FOR NEW MULL CAMPUS 
Page 380

Page 381

2.0 RECOMMENDATION 
That the Council: 
2.1.1  Note that the Scottish Government has confirmed the timescales for the next
round of the Learning Estate Investment Programme (LEIP) i.e. inviting
submissions by 31st October.   
2.1.2  Note a business case and application is being prepared for a submission to the
LEIP process for a new Campus on Mull in line with the adopted Learning Estate
Strategy; 
2.1.3  Note that pre-engagement activity has been ongoing with the Mull community
about the potential LEIP bid between August and 9th September with over 200
representations or feedback received.  Further statutory consultation will take
place if a bid is made and successfully progresses to the next stage; 
2.1.4 Note and consider the financial position and affordability of a LEIP bid as set out
in attached Appendix B.  This appendix is exempt from publication due to the
commercially sensitive and competitive bid nature of financial forecast
information contained.   
2.1.5 Agree to proceed with the submission of a LEIP bid by 31st October based on the
entirety of this report, our priorities specified in the Learning Estate Strategy,
financial context and advice from Section95 officer (Appendix B), pre-
engagement feedback (Appendix C) and on the basis that if our bid is successful,
financial provision as estimated in Appendix B will require to be made from
2023/4 onwards.   
3.0 Background
3.1 The Scottish Government launched the Learning Estate Investment Programme
(LEIP) in 2019 and aims to deliver over £2bn of education estate jointly funded by
them and Local Government.  There have been 2 phases of LEIP already and 37
projects across the country are now underway at various stages with some nearing
completion of construction.  The 3rd phase was launched following the Local
Government elections in May this year.  Argyll and Bute Council are in the minority
as we have not applied for any LEIP funding thus far and it is notable that only 1
Island project (Barra) has been successful in obtaining funding from across the
country.  There is a keenness for a wide and equitable sharing of this government
fund and Scottish Futures Trust (SFT) have encouraged Argyll and Bute’s (and
others) participation in round 3 of LEIP.  We anticipate it will be a very competitive
process with oversubscription of applications due to this being last round of
government funding on offer plus financial challenges of all Councils.  To this extent,
there can be no guarantee that if a bid from Argyll and Bute is submitted it would be
successful.   
3.2 The funding model for LEIP differs from the ‘Schools for the Future Programme’.  In
summary, successful local authority applicants will benefit from the Scottish
Government providing revenue funding for the new builds through an annual
payment over 25 years on the basis that certain criteria are met.  These criteria
include ‘condition of the building’ (to be maintained as Grade A or B for lifetime),
Page 381

Page 382

‘energy efficiency’, ‘digitally enabled’ and ‘supportive of economic development’.
Recently added criteria also apply to things like embodied carbon, EV charging
infrastructure, outdoor learning and infection control.  The Scottish Government
is likely to meet around 50% of the build costs over the 25 year lifetime.   Costs
for elements such as purchase of land, residential / hostel accommodation,
operational or running / revenue costs and design development fees are also
excluded from the LEIP funding that is provided so Council would need to meet
these in full.   
4.0 Timescales for Phase 3 – Political, Financial & Community Commitment 
4.1 In December 2021 the Cabinet Secretary for Education and Skills outlined to
Parliament that LEIP Phase 3 would seek projects within 12 months.  The following
are the most up to date timescales for the programme:- 
 1st July 2022 – LEIP Board wrote to CEO to invite submissions;
 11th August 2022 – Pre-engagement Community Meetings Mull;
 29th September 2022 – Argyll and Bute Full Council to consider;
 31st October September – Local Authority Submissions;
 December 2022 – LEIP Board announcement of successful bids;
 December 2027 – New facilities to be opened 
A more detailed routemap can be seen at Appendix A. 
4.2 The Scottish Government have set out a number of detailed requirements for
submissions and are encouraging Councils in their applications to cover: 
a) Local investment priority(s) and their context within the ‘Place’
b) The proposed Vision, Strategic Outcomes and Objectives for the
project(s)
c) Alignment with Learning Estate Strategy 2019 Guiding Principles
d) Ensuring political and financial commitments are in place for the
investment priority(s)
e) Demonstrating implementation of the terms and conditions of the
programme on Phase 1&2 projects (where applicable). 
4.3 The project team developing the bid are well progressed with the proposition for
LEIP 3 in the context of the above. 
5.0 Strategic Outline Case - Mull
5.1 In accordance with the Council’s adopted Learning Estate Strategy the Council has
prioritised cases for strategic change on Islay and Mull.  This is based on current
suitability and condition aspects of the current infrastructure / estate but also noting
the majority of mainland towns have had new campus developed within the last 15
years and seeking to address our islands on an equitable basis.  Previous Scottish
Government funding has been accessed to deliver new schools at Hermitage
Academy, Dunoon Grammar, Oban High, Oban Primary Campus, Campbeltown
Grammar, Rothesay Joint Campus, Lochgilphead Joint Campus, Dunoon Primary
(significant refurbishment) and Kirn Primary at a cost of around £180m.   
Page 382

Page 383

5.2 Consistent with all local authorities our Schools are assessed in terms of suitability
(from an educational perspective) and condition (from a building fabric perspective). 
The current assessments highlight:- 
SCHOOL CONDITION CRITERIA SUITABILITY CRITERIA
ALL Islay B B
ALL Mull (excluding
Tobermory)
B B
Tobermory
Campus
B C 
Definition of Condition 
B = ‘Satisfactory’    Condition C = ‘Poor’ 
5.3 Given current Tobermory Campus is assessed to be ‘C - poor’ in terms of suitability
there is a requirement to improve the situation and that is therefore our top priority.
The lower grading of Tobermory is largely driven by accessibility, restrictive drop off
space, lack of social spaces and restricted specialised classes.  Given that LEIP
will only fund up to 50% of construction costs of eligible spaces with the remainder
having to be resourced by Council or other sources it would be unaffordable to
progress with 2 bids at this current time.  Given the nationally competitive nature
and likelihood of oversubscription to this fund we are also looking to consolidate
with a single unified bid for Mull – rather than twin tracking multiple applications.   
5.4 Analysis of the council expenditure on Mull also highlights a trend of increasing
reactive or maintenance spend and a sizable sum of investment on degrading
fabric at the high school over the past 5 years. Items like water ingress in roofs +
electrical upgrading is common source of expenditure.  The condition of the building
can be improved from further investment, however the suitability is much more
challenging to be upgraded without wholesale remodelling.  Such year on year
construction can be detrimental on both pupils and learners over long period of time
or require decanting of operations for periods.  Other environmental (climate
change) standards or digital enhancements will also remain below the minimum
standard compared to a new build LEIP school.   
5.5 The services of Hub North (who assisted in development of some of our previous
school projects) and the Northern Alliance (an Education focussed support network)
have led to the development of a ‘Business Case’ for Mull.    As this is a strategic
or initial business case no specific sites or models have been tested.  The bid, if
progressed, would be an application for funding to benefit the entire island of Mull. 
More detailed site selection and analysis of costs will require to be completed if
we are selected by the Scottish Government to proceed to the next stage of the
process.  It is the responsibility of the Council to meet all design development,
consultations, site assessment and land acquisition costs up front.   
6.0 Financial Case & Affordability 
6.1 As we know from experience the construction of new public infrastructure –
particularly the education estate and on islands – comes with significant financial
commitment.  As a benchmark the new Oban High and Campbeltown Grammar
cost in excess of £36m and £26m, respectively.  At this stage high level numbers
and financial forecasts are being worked on to allow for budget planning and
Page 383

Page 384

decision making.  It will be necessary to identify suitable ‘island weighting’ and
construction sector inflation to budgets given the nature of building on Mull.
Budgetary figures will be refined and crystallised if successful in progressing to the
next stages of LEIP process and during site selection but enough information is
present to provide an informed range of costings or financial outlay that will be
required.   
6.2 Information relating to finance is contained within Appendix B for elected Member
consideration.  Some of the financial information is sensitive due to commercial and
competitive nature of the bid at this stage and is therefore publicly restricted.   
6.3 At the levels of investment that are being considered there is no denying this will be
one of the biggest public sector infrastructure projects on the island in many years
and has potential for regeneration and economic stimulus. Jobs created during
construction period and longer term attraction of a modern campus with modern
facilities can act as a catalyst for change.  Depending on site selected it can also
have secondary benefits – as we have seen in Helensburgh where the new
Hermitage Academy has now had a supermarket, business park and new housing
development expanded on 3 sides of it since its construction.  Site selection will
have a key impact on overall affordability and financial context as things like ground
conditions, land ownership, availability of labour and decant (if required) will all need
to be considered.   
7.0 Engagement 
7.1 For such a significant transformational investment to succeed it is essential to
understand and engage with our communities.  There is no statutory or Government
requirement to consult with our communities prior to a LEIP Submission being made
in October.  However, submitting evidence that we have commenced some form of
awareness raising and engagement with our communities is likely to strengthen our
submission in this competitive process. If successful in our application a formal and
statutory period of community consultation would follow as outlined at Appendix A.     
7.2 The team have undertaken a pre-engagement exercise with stakeholders on Mull
and a number of workshops have been held on 11th August and 7th September. 
Social media campaign and 1:1 discussions with Community Groups also took
place.  The engagement and message has been at a high level with the purpose of
the pre-engagement being primarily to allow stakeholders to confirm if they have
ambition for a new campus based on Mull.  The process has also been really useful
as in dialogue with the community we have been finding additional ways of
communicating and ensuring that all messages reach all groups of interested
community members. Should we be successful in the funding submission, this will
all be extremely useful to shape the engagement programme for the Statutory
Consultation.  Some of the messaging has been about the background to LEIP
Process, headlines from the business case, photos / videos of schools Council has
developed in past, next steps and timescales.   
7.3 The Stakeholders have included: 
 Ward Councillors
 HT & School Staff
 Parent Councils
 Pupils
 Community Councils
Page 384

Page 385

 Wider Public 
7.4 A summary of the feedback obtained thus far is contained at Appendix C.  With
main headlines being
 Overwhelming support for a new campus on Mull to serve island + Iona;
 Varying views on location of new campus – central island VS Tobermory;
 Importance of widespread engagement with all parts / groups of Community;
 Interest from some in Hostel accommodation that could address long travel
issues (we should note however that this has been relatively low and early
indications are that the addition of a new hostel would not qualify for LEIP
funding and the potential costs would be substantial);
 Range, scope and importance of community facilities integrated;
 Staffing and curriculum assurance and attainment; 
7.5 Unanimous support for a new campus has been expressed thus far but feedback
on location was overwhelmingly of most interest to participants.  To be clear, the
bid will be for a campus on Mull, with location and site specific’s to be considered
and engaged on if we do progress to next stages in 2023 onwards.  There are
varying degrees of interest for hosting the new site in or around Tobermory (the
existing town for the campus) but also in a more central island location.  There
are a range of complex positions on both.  Whilst this is not a matter to be
considered now or before LEIP bid is submitted in October it is essential that
Members are aware there is a divergence of views within the Community on
where the campus should be located and there is potential for disappointment or
conflicting views that require to be considered alongside management of
expectations. 
8.0 Summary and Next Steps
8.1 The Council is invited to instruct officers to continue with preparation and
submission of LEIP Bid by 31st October 2022 based on the information contained
herein.  This decision needs to be considered in the context of the educational
priorities contained within our Learning Estate Strategy, learning benefits,
regeneration, condition / suitability of the current building, community and overall
affordability.   
8.2 All LEIP applications will be considered by a Scottish Government appointed
panel with final decision resting with Ministers.  The Panel is programmed to write
back to all applicants in December 2022 with outcome.  Feedback will be reported
back to full Council in early 2023.   
9.0  Implications 
9.1  Policy –  The Council’s Learning Estate Strategy 2021 sets out that the 
ambition is to provide a property school estate that is of category A   
or B in terms of suitability and condition plus a number of other   
modern standards.  Seeking to access LEIP funding to deliver new   
build estate on our priority location, Mull, supports that ambition. 
Page 385

Page 386

9.2      Financial  -  Accessing LEIP is a significant financial commitment to the Council   
as the entire design development, associated cost like land 
acquisition (if required) and construction costs will be required to be   
met in full by the Council.  The SG would then provide up to 50% of   
eligible capital costs back over 25 year annual payment if criteria is   
met.  There is risk in this model should criteria not be met and also   
in terms of risk of construction in current climate so specific financial   
and affordability advice from Section 95 Officer has been provided.   
9.3      Legal –  Accessing LEIP is a significant contractual and legal commitment to   
the Council  which will be duly considered if move to next stage.   
9.4      HR –   None at this stage.  Considered at future stages if progress.   
9.5      Fairer Scotland Duty               
9.5.1 Equalities –  None at this stage.  Considered at future stages if progress.                 
9.5.2 Socio-economic Duty – The level of investment in a new Campus will be 
substantial and Scottish Government have set requirements to    
deliver socio economic benefits if progressed.               
9.5.3 Islands –  Positive implications given top priority in this competitive process    
has been identified as Mull.   
9.6 Climate Change – Scottish Government have set requirements to key climate change    
criteria and benefits if progressed 
9.7 Risk –   Risks exists both in terms of financial and reputational.  If progress    
to next project stages a risk register will be developed.   
9.8 Customer Service – Pre-engagement has commenced and will be ongoing 
throughout process as progress.   
Douglas Hendry – Executive Director with responsibility for Commercial
Services and Education. 
Yvonne McNeilly – Policy Lead for Education 
For further information contact: 
Ross McLaughlin, Head of Commercial Services              
Ross.mclaughlin@argyll-bute.gov.uk 
Appendices 
Appendix A - Routemap
Appendix B - Financial & Budget Position (PUBLICALLY RESTRICTED) 
Appendix C - Pre-Engagement Feedback
Appendix D – Draft Submission – working draft for 31st October (PUBLICALLY
RESTRICTED) 
Page 386

Page 387

Appendix A – Routemap 
Page 387
Agenda Item
20b

Page 388

This page is intentionally left blank

Page 389

Document is Restricted
Page 389 Agenda Item 20cNOT FOR PUBLICATION by virtue of paragraph(s) 8, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 390

This page is intentionally left blank

Page 391

Appendix C – Pre-Engagement Feedback 
A series of pre-engagement sessions were held in Tobermory High School on Thursday
11 August and in Bunessan Primary School on Wednesday 7 September, both of which
were well received. 
There were sessions for school staff; parent / community Councils; Parents and public.
Each of the sessions had a presentation from Wendy Brownlie, Head of Education and
Ross McLaughlin / Shirley Johnstone, Commercial Services providing information
around why Mull was considered the councils priority, and the LEIP funding and Learning
Estate Strategy. 
There were information boards which provided examples of completed projects within
Argyll and Bute and nationally to demonstrate the sort of learning environment that can
and has been achieved. 
There was an opportunity for attendees to speak to the team made up of education and
commercial services officers (also supported by colleagues from the Northern Alliance at
the meetings held on 11 August), with all attendees being encouraged to leave feedback
and comments. 
Pupil engagement sessions were held during the weeks of 15th and 22nd  August 2022
and further feedback on the comments and views expressed by pupils were gathered
from all sessions. 
Summary of the attendees and responses   
0
20
40
60
80
27 18 23
3
62
Pre-engagement session attendance
Bunessan
Community
Parents & Carers
PC & Community Council
Chairs
School Staff
Page 393 Agenda Item 20d

Page 392

Response to the Exit Poll question 
The exit poll question at each session in both Tobermory and Bunessan and at each
of the school sessions with pupils was “Do you want us to progress with the Learning
Estate Investment Programme funding application for a new campus on Mull?” 
At all of the sessions for teachers, parents, public (primarily attended by adults) there
was a unanimous “Yes” with no one responding with “No”. 
The pupil sessions was slightly different.  The chart below shows the total number of
responses received through all of the face to face sessions and the support received
by email: 
Following the pre-engagement sessions, all of the information provided on the day is
was made available on the council’s website at www.argyll-
bute.gov.uk/consultations/mull-campus with a dedicated email address for anyone to
provide a comment / view.  Through communications on the council’s social media
and through the schools and community councils there had been several reminders
and encouragements to leave a comment before 9th September.  Please see below a
summary of the topics that were raised: 
Unanimous support for a new campus has been expressed thus far but feedback on
location was overwhelmingly of most interest to participants.  To be clear, the bid will
13 4
57
45
16
112
131
1
35 21
0
Details of the Categories of Issues Raised
Accessibility
Buildings
Community
Curriculum
Hostel
In Favour
Location
Nursery/Pre5
Outdoor Facilities
295
46
39
Total
Sum of Yes
Sum of No
Sum of Not Sure
Page 394

Page 393

be for a campus on Mull, with location and site specific’s to be considered and
engaged on if we do progress to next stages in 2023 onwards.  There are varying
degrees of interest for hosting the new site in or around Tobermory (the existing town
for the campus) but also in a more central island location.  There are quite a range and
complex positions on both.  Whilst this is not a matter to be considered now or before
LEIP bid is submitted in October it is essential that Members are aware there is a
divergence of views within the Community on where the campus should be located
and there is potential for disappointment or conflicting views that require to be
considered alongside management of expectation.
Page 395

Page 394

This page is intentionally left blank

Page 395

Document is Restricted
Page 397 Agenda Item 20eNOT FOR PUBLICATION by virtue of paragraph(s) 8, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 396

This page is intentionally left blank

Page 397

ARGYLL AND BUTE COUNCIL  COUNCIL
DEVELOPMENT AND 
ECONOMIC GROWTH 
29th September 2022 
BID4OBAN - APPROVAL OF BALLOT SUBMISSION AND BUSINESS PLAN -
THIRD BALLOT 
1.0 EXECUTIVE SUMMARY 
1.1 At the Council meeting on 30th June 2022 Elected Members considered a report
which asked members to endorse the Oban Business Improvement District
(BID) ballot submission and to note the Draft Business Proposal Term Three, in
support of the ballot. Due to internal issues at BID4Oban, the ballot was not able
to go ahead on the planned date of Thursday 6th October 2022. The final ballot
submission documentation and the business proposal has now been received. 
1.2 The purpose of this report is to ask Members to approve the Oban Business
Improvement District (BID4Oban) ballot submission and to approve the
Business Proposal, Term Three, in support of the ballot.  The ballot is due to
take place on Thursday 8th December 2022 (the ballot day).  This will be a postal
ballot and votes must be received by 5pm on the ballot day to be considered
valid and included in the count. 
1.3 The principle aim of the BID is to deliver projects and events to improve the
trading environment for businesses, their customers and visitors. The business
proposal informs levy payers on specific contributions required and outlines the
objectives, benefits and outcomes of a BID over a 5-year period. The business
proposal also sets out how levy contributions will be used and details the
assumed return from this investment. 
1.4 If approved, the ballot will take place over 42 days, from Thursday 27th October
to Thursday 8th December (‘the ballot day’) in 2022. If successful the levy could
potentially raise £168,362 a year to be spent on Oban, and over 5 years this
could be in excess of £841,810.  BID4Oban have therefore proposed how
these levy payments could be invested to further grow the economy of Oban,
based on the success of the previous two terms of the BID4Oban delivery. 
1.5 Through the provision of information and advice, Officers from Development and
Economic Growth, Legal and Governance, Customer Services and Strategic
Finance have supported BID4Oban in their development of this BID ballot
submission. The BID4Oban Business Proposal, Term Three, is attached at
Appendix One.  The business proposal represents the Oban Business
Community’s proposals for the most effective utilisation of the BID’s levy, to
support the continued development of Oban.   
Page 407 Agenda Item 21a

Page 398

RECOMMENDATIONS 
That the Council agrees:-   
a. To approve the ballot request, to approve the Oban BID Business Proposal
and agree to instruct the Returning Officer to conduct a ballot over 42 days in
2022 from Thursday 27th October to Thursday 8th December (‘the ballot
day’). 
b. To authorise the Executive Director with the responsibility for Development
and Economic Growth to cast the votes on behalf of the Council in favour of
the BID. 
c. To approve that the Council will charge £7,956 (incl VAT) per annum, to
BID4Oban for administering the levy charge to businesses in Oban, with
charges thereafter increased annually. The first increase will apply on 31st
October 2023 and annually thereafter for the subsequent term of the BID. 
d. To approve that, if BID4Oban are successful in the ballot, the Council will
pay an estimated £6,120 per annum in levy contributions for Council
properties in Oban. 
e. To note that if the BID group are successful in the ballot, two representatives
from the Council would be requested to sit on the BID4Oban Board, one
Elected Member and one Officer. 
Page 408

Page 399

ARGYLL AND BUTE COUNCIL  COUNCIL
DEVELOPMENT AND 
ECONOMIC GROWTH 
29th September 2022 
BID4OBAN - APPROVAL OF BALLOT SUBMISSION AND BUSINESS PLAN -
THIRD BALLOT 
2.0 INTRODUCTION 
2.1 At the Council meeting on 30th June 2022 Elected Members considered a report
which asked members to endorse the Oban Business Improvement District
(BID) ballot submission and to note the Draft Business Proposal Term Three, in
support of the ballot. Due to internal issues at BID4Oban, the ballot was not able
to go ahead on the planned date of Thursday 6th October 2022. The final ballot
submission documentation and the business proposal has now been received. 
2.2 The purpose of this report is to ask Members to approve the Oban Business
Improvement District (BID4Oban) ballot submission and to approve the
Business Proposal, Term Three, in support of the ballot.  The proposed ballot is
due to take place on Thursday 8th December 2022 (the ballot day).  This will be
a postal ballot and votes must be received by 5pm on the ballot day to be
considered valid and included in the count. 
2.3 The BID4Oban (BID) has successfully completed its second BID term with a
number of key objectives delivered for the benefit of the town of Oban over
the past ten years. The Business Proposal, Term Three again sets out the
governance, objectives, levy payments and benefits for business owners in
Oban.  In line with this, if the ballot is successful, the Council will be required to
pay an estimated annual levy charge of £6,120 over five years for Council
properties in Oban. 
3.0 RECOMMENDATIONS 
3.1 That the Council agrees:-   
a. To approve the ballot request, to approve the Oban BID Business Proposal
and agree to instruct the Returning Officer to conduct a ballot over 42 days in
2022 from Thursday 27th October to Thursday 8th December (‘the ballot
day’). 
b. To authorise the Executive Director with the responsibility for Development
and Economic Growth to cast the votes on behalf of the Council in favour of
the BID. 
Page 409

Page 400

c. To agree that the Council will charge £7,956 (incl VAT) per annum, to
BID4Oban for administering the levy charge to businesses in Oban, with
charges thereafter increased annually. The first increase will apply on 31st
October 2023 and annually thereafter for the subsequent term of the BID. 
d. To agree that, if BID4Oban are successful in the ballot, the Council will pay
an estimated £6,120 per annum in levy contributions for Council properties in
Oban. 
e. To note that if the BID group are successful in the ballot, two representatives
from the Council would be requested to sit on the BID4Oban Board, one
Elected Member and one Officer. 
4.0 DETAIL 
BID4Oban Business Plan 
4.1 The BID4Oban (BID) has successfully completed its second BID term with a
number of key objectives delivered for the benefit of the town of Oban. The
business proposal informs the Council and other levy payers with regard to
the merits of continuing the BID initiative, which has been in operation for the
last ten years. 
4.2 The principle aim of the BID is to deliver projects and events that will improve
the trading environment of the BID area to benefit businesses operating in the
town of Oban, their customers and the many visitors to the town.  The
Business Proposal, (appendix 1) sets out the main objectives, benefits and
outcomes of the BID board to be delivered over the next five years of
operation.  It informs the council and other levy payers on the level of their
contribution, how this will be collected, and what the levy payers will see in
return for their investment. The likely income and expenditure is included in
the Plan as well as management and governance mechanisms. A process of
consultation with levy payers has been undertaken by the BID.   
4.3 The benefits of the levy are that it could potentially raise £168,362 a year to
be spent in Oban, and over 5 years this could be in excess of £841,810.  This
would allow local businesses to spend money on their priorities that will work
alongside future council and key partner activity.    
BID4Oban Process 
4.4 The ballot submission sets out the BID ballot process. It is proposed that the
ballot will open for 42 days in 2022 from Thursday 27th October to Thursday 8th
December (‘the ballot day’), with the ballot papers being counted on Friday 9th
December 2022 and the results published within one week of this date. This
will be facilitated by Argyll and Bute Council. 
4.5 For the BID to be successful the ballot has to demonstrate a minimum 25%
turnout and of those that vote, over 50% by number and 50% by combined
Page 410

Page 401

rateable value must vote in favour of the bid. 
4.6 If successful, the third term of the BID will commence again on 19th December
2022 and will run for a period of five years until the 31st October 2027.  
Council Commitment and Finances 
4.7 The Council has committed both local Elected Member and local officer time
to the BID over the past ten years.  If the BID ballot were successful,
BID4Oban would again request two representatives from the Council to sit on
the BID Board, one Elected Member and one officer. 
4.8 If the ballot is successful then Argyll and Bute, as a levy payer, will be
required to pay levy on its properties in Oban.  This estimated contribution is
£6,120 per annum. 
4.9 If the ballot is successful the Council will charge BID4Oban £7,956 (incl VAT)
per annum, for administering the levy charge to businesses in Oban, with
charges thereafter increased annually.  The Operating Agreement states that
“The Council’s charge for the provision of the Services on an annual basis will
be £6,500 (excluding VAT) (the “Council Annual Charge”), representing its
reasonable administrative costs in providing the Services (to be identified and
agreed between the Council and the BID Company) yearly, and having effect
on the 31 October of each year for which a BID is in place. Charges will be
increased annually by CPI based on the increase over the last 12 months. 
Following receipt by the BID Company of a valid VAT invoice, the first
payment will be due together with VAT within 4 weeks of receipt, or later by
agreement.”  The Council’s charging price noted above is based on October
2022 and will be updated by CPI annually.      
5.0 CONCLUSION 
5.1  BID4Oban has been highly successful over the last ten years of operation with a
significant number of initiatives and projects carried out that are in addition to
statutory and non-statutory council services.  The BID4Oban Board, following
consultation with levy payers, has decided to ballot for a third term of five years
and have prepared a business proposal (attached as an Appendix to this report)
that identifies their objectives for the next five years.  If successful this process
will allow the work of the BID to continue in relation to the improvement and
promotion of Oban, adding to the work undertaken by the council and a range of
other partners drawn from across the sectors. This report recommends that the
Council approve the ballot request, and approve the BID4Oban Business
Proposal, Term Three, attached as Appendix 1 and associated financial
requirements. 
6.0 IMPLICATIONS 
6.1  Policy – Supports the delivery of the Local Outcome Improvement Plan and
Page 411

Page 402

the Council’s Economic Strategy and Economic Recovery Plan. 
6.2  Financial - The estimated Council levy payment will be £6,120 per annum for
a period of 5 years as a budget pressure from the general unallocated fund.
The Council will charge £7,956 (incl VAT) per annum to the BID4Oban for the
collection and administration of the levy, with charges increasing on an annual
basis. 
6.3  Legal - Facilitation of ballot. 
6.4  HR - Council officers are supporting the Oban BID. Two Council
representatives, one Elected Member and one Officer will be requested to
attend BID4Oban Board meetings. 
6.5  Fairer Scotland Duty  
6.5.1  Equalities –protected characteristics – None. 
6.5.2  Socio-economic Duty - The BID aims to reduce inequalities of outcome
caused by socio-economic disadvantage in Oban and represents the
collective responsibility to grow the Oban economy. 
6.5.3  Islands - This BID will encompass the whole of Oban. 
6.6  Climate Change - The business plan will take environmental impact into
consideration in the delivery of projects. 
6.7  Risk – The ballot may be unsuccessful. 
6.8  Customer Service – None.   
Executive Director with the responsibility for Development & Economic Growth
– Kirsty Flanagan 
Policy Lead for Economy and Rural Growth – Councillor Robin Currie 
September 2022                                                  
For further information contact:
Fergus Murray, Head of Development and Economic Growth
Fergus.Murray@argyll-bute.gov.uk 
Page 412

Page 403

Document is Restricted
Page 413 Agenda Item 21bNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 404

This page is intentionally left blank

Page 405

Appendix 2 
29/8/2022.     Details of Consultation Process 
Consultation of the BID4Oban renewal ballot is ongoing. This will continue between now and the
publishing of the full business plan which is expected to be published in draft by 31/08/2022 with a
full version being sent to those eligible to receive ballot papers and therefore vote on the proposal
by 27/10/2022. 
Initial conversations have taken place with 59 local businesses (appendix 1) who are fully
supportive of what we have achieved and what we plan to do in a third term. 
As an active BID we are in regular contact with all our levy payers via direct face to face contacts,
direct emails, social media and MailChimp emails to all levy payers. 
At our AGM of 20th April 2022, there was resounding support for the BID to continue as a result of
COVID recovery and the work undertaken by the BID company. 
We have engaged the services of a media company Innes and Campbell who are actively
producing a communications strategy as soon as the draft Business Plan is produced. This will
highlight all our achievements over the last ten years and our exciting proposals for our third term. 
As series of roadshows/meetings will be undertaken for the 42 days between sending out of ballot
papers and the ballot date. 
Given that Oban is a highly seasonal town, the majority of consultations and communication of
proposals will be one to one, face to face. We are working with AITC (Argyll and the Isles Tourism
Cooperative) to highlight the benefits of the BID Company. 
We have a close working relationship with our Area Committee of Councillors, MP and MSP’s.
They are fully supportive of our BID for a third term. 
Our work with our local newspaper, Oban Times is testimony to some of our successes and we
feature weekly with support for business and events etc.
All consultations have been logged and are available for scrutiny in the following Appendices:
2.1 Oban BID Renewal Ballot Survey.
2.2 Mailchimp Campaign Results for 122 emails to Levy payers.
2.3 Oban BID Re-Ballot, 21 July 2022. Details of Email posted.
2.4 Oban BID Re-Ballot - Consultation Reminder Rockfield Centre
2.5 BID4Oban Re-ballot Survey - Urgent Survey Request
2.6 Oban Times BID4Oban 20 page review pullout 
2.7 Oban Times  News from BID4Oban - The Oban Times13 April 2022
2.8 Oban Times  BID4Oban News - The Oban Times 16-06-2022
2.9 Oban Times  BID4OBan-Ballot-ToExtendObanBIDfor5yearsAPPROVED-07-07-2022
2.10 Oban Times BID4Oban ballot update - The Oban Times 13-07-2022 
Page 415 Agenda Item 21c

Page 406

2.11 Oban Times  Have your say at BID4Oban consultation meetings - 01-08-2022
2.12 Google Analytics Oban.org.uk 1 Nov 2017 to 30 Aug 2022 – 8.9 million pageviews
2.13 Facebook Statistics August 2022.
2.14  Next Steps Document. 
Andrew Spence
BID4Oban Chief Executive.
Page 416

Page 407

Appendix 3
BID 4 OBAN Renewal ballot Business Plan 
Foreword by Antony Cave BID Chair 
I am delighted to present this renewal proposal, which outlines your priorities and gives a taste of how
we can continue to improve and make Oban even better by working together. 
A BID is where businesses, within a defined geographical area, vote to invest collectively in local
improvements over and above those provided by statutory authorities. It is a partnership arrangement
where the local business community and the statutory authorities work together on projects that will
benefit the local economy and local businesses. 
Continued support BID4Oban provides a great opportunity to work together and make the changes
we all want. The cost to our businesses is low and through BID4Oban we can maintain access to
external assistance and funding not available to individual businesses. 
All the proposed improvements were ideas initially from you, which came out in our surveys and
consultations. Every business in the area has had the opportunity to let us know what their priorities
are. 
By getting involved in BID4Oban, we can keep working together to increase footfall, stimulate
investment and enhance the reputation of our town. The purpose of the BID4Oban is to support our
businesses and our community, increase trade, improve our business environment, and make Oban
an altogether better place to live, work and of course play. 
You can find more information on our website www.bid40ban.co.uk , or for more general or national
information refer to ImprovementDistricts.scot 
A notice of ballot will be sent to all eligible persons (those eligible to vote in the ballot) on or before
27/10/2022 along with ballot papers. Those eligible to vote will have 6 weeks to cast their vote before
the ballot closes at 5pm on 08/12/2022 Ballot papers received after this date and time will be null and
void and not be counted. 
I have been involved in business in Oban for several years and know a lot of the businesspeople in the
area. I would ask you all to vote YES so that we can work together to continue to make Oban the
thriving prosperous business community we have become accustomed to. 
Being a part of the business community in Oban for many years and having seen the
benefits of the BID, I would ask you all to vote YES so that we can continue working together
for the benefit of the town and our local community. 
Chair – Antony Cave 
Page 417

Page 408

Craigard Décor
Craigard Road, Oban 
“Business” or variations of the word “business” are used throughout this document. The word
“business” in this context refers to property owners or tenants and occupiers of properties who are
liable to pay the non-domestic rate (NDR), whether they pay business rates or not. This includes all
properties listed on the Scottish Assessors Association Portal (website) with a non-domestic rateable
value, many of whom may be a charitable organisation, public sector organization, social enterprise
or community group who may not consider themselves to be a business
Aims and Objectives of BID 4 Oban 
Our Aim
The principal aim of the BID is to deliver projects and services that will improve the
trading environment of the BID area to benefit businesses, their customers and
visitors. 
Our Objectives
● To improve the economic opportunities for the businesses in the town
● To increase footfall, both local and visitor
● To make the BID “cost neutral” for each business 
● To address the issues of individual sectors
● To improve businesses’ relationships with each other, the local authority and
the community
● To market the town to a local, regional, national and international audience
in conjunction with AITC
● To give businesses a strong, unified voice
● To support local voluntary groups whose aims align with the BID
● To work closely with the local Tourist Association to increase awareness of
the town outside the local area 
What exactly is a BID?
A business improvement district (BID) is about businesses working together and investing
collectively in local improvements in addition to those delivered by the statutory
authorities, over an agreed period (normally 5 years). Stronger together than working alone.
A business improvement district is usually a partnership arrangement through which the
local business community and the statutory authorities take forward projects to benefit the
local businesses and grow the local economy.
Page 418

Page 409

A BID is not a substitute for central or local government expenditure, but an additional
investment to strengthen the local economy.
BIDs are developed, managed and paid for by the private sector using a compulsory Levy,
which the businesses within the proposed BID area must vote in favour of before the BID
can be established. The ballot for the Oban BID will be open for 42 days from the 27th
October to the 8th December 2022, the ballot day.
Each business liable to contribute to the BID will be able to vote on whether or not the BID
goes ahead.
History of the BID movement
BIDs started in Canada over 40 years ago in a small town called Bloor West Village, near
Toronto.  Businesses struggled to cope with competition from a new out-of-town shopping
centre, which resulted in many business insolvencies, empty shops and a neglected-looking
town centre. Businesses got together and devised a plan to revitalise the town and
successfully lobbied for legislation for all businesses in the proposed BID area to pay a Levy.
The investment Levy was used to make physical improvements to the town centre and to
promote the town. The success of the Bloor West Village BID paved the way for future BIDs.
Today there are over 1700 successful BIDs worldwide.
An additional measure of BID’s success is in the renewal process. Most BIDs run for five
years and approximately 99% of businesses vote in favour of continuing the BID when they
come up for renewal. In Scotland, all of the BIDs that have been to renewal ballot have
successfully demonstrated that businesses value the projects and services delivered by the
BIDs. BIDs can support regeneration, grow local economies, create local employment and
create a cleaner, safer trading environment. A key element to their success is the local
businesses taking ownership and responsibility for their trading environment; identifying
the necessary projects to resolve common problems and issues and overseeing its
implementation, whilst also contributing to the future direction of the town and its
development. There are currently 35 fully operational BIDs in Scotland with a further 30 in
development. 
Why should BID4Oban Continue?
If we do nothing, then nothing will be done! 
Oban has experienced significant changes over recent years, not least the challenges posed
by Covid which along with cutbacks in local authority budgets, the increased traffic in the
town due to RET, and the increased pressure that it is putting on the town’s limited parking
provision. In the last 10 years, BID4Oban has worked tirelessly on behalf of the businesses in
the town and the broader local community to mitigate these challenges. 
Traffic management and access issues are a problem for a lot of businesses. The continuing
Page 419

Page 410

rise of energy costs and the new rateable values are putting more pressure on businesses
and Oban requires a coordinated response from all businesses to address these problems. 
The retail sector, in particular, has suffered with the growth of online shopping; however,
we are fortunate that having a strong tourist trade has helped to mitigate some of this
impact with a vibrant, clean and attractive town which continues to lead and support events
and activities that encourage visitors and locals alike. To keep tourists and shoppers coming
to Oban, we have to encourage visitors to come in the quieter months in increasing
numbers and so extend the season.  In addition, we have to work with and occasionally
lobby the local authority to ensure that local strategies do not negatively impact trade. 
After consultations with businesses from a range of sectors, it became clear there was
commonality in the problems they faced. There is a continued desire to see Oban prosper
and a real appetite to embrace a new way forward and to change and make improvements. 
There are lots of voluntary groups in the town, with no shortage of community spirit and a
‘can do’ attitude. These groups can suffer from a lack of funds and dedicated resources
which is where BID4Oban can help local groups to achieve more with extra resources and
funding which provides the cohesion that helps all types of local groups to deliver better
results both for their groups and the benefit of the wider community. 
There is a desire from a range of sectors to see improvement in the town’s marketing
activity. The BID will continue to work directly with AITC (Argyll & the Isles Tourism Co-
operative), under a memorandum of understanding, with a defined budget to deliver key
projects. BID4Oban will also work with local environmental groups. This will help to improve
the overall appearance of the town for the benefit of locals and visitors alike. We will
improve the biodiversity of the town and assist the local authority to adopt greener
environmental strategies that will be sustainable due to overall savings made. 
BID4Oban provides a unique opportunity for local businesses across all sectors to work
together, invest collectively and undertake projects which contribute positively to improving
the economic viability of the town and securing investment in the town. 
History of BID4Oban
The concept of a BID in Oban was first discussed in 2008. A steering group was set up by
like-minded businesses that dedicated staff time and agreed that increased investment was
required for the town to maintain its competitiveness and increase the number of visitors
coming to the area.  After work by the original steering group in 2012 was done, a ballot was
held and BID4Oban came into being. BID4Oban has operated for 10 years as a not-for-profit
limited company with a dedicated and independent board of directors. The support of the
Scottish Government and Argyll and Bute Council has been integral to the success of this
project.
Page 420

Page 411

How does Oban benefit from BID4Oban? 
All businesses in the town have the opportunity to benefit from the projects and services
that the BID4Oban delivers. Some such services are:
● Support for existing groups and organisations
● An improved customer perception of accessibility
● Improved customer knowledge of goods and services
● Increased marketing to local, regional, national and global customers
● Access to funding to reduce property improvement costs
● Cost reduction through professional negotiation on utility bills
● Cost reduction through collective investment and joint promotion
● An increased number of visitors
● A local voice for business opinions included in local policy and developments
● Better trained staff to improve customer service
● Increased networking opportunities
● Improved signage
● Increased use of technology to solve local problems BID4Oban WIFI
● Projects to increase shop diversity and lower vacant unit rates
● Information seminars to help with the problems that particularly affect SMEs
● Collective training programmes, reducing staff travel time and delivering savings
Key highlights BID4Oban 2017-2022 
● 51 Events supported financially at a cost of £92,460
● Numerous events supported by in kind support & Advice 
Some of our Achievements and Projects
● 550 Businesses pay the levy
● Income £200K PA
● 200 Business improvement grants awarded
● Oban Live – Four-year project generating £1.4M PA
● In kind support Oban Live £20K
● Town diary of events & Oban What’s On maintained and populated
● Annual Events List populated and circulated annually
● Over 90,000 recorded interactions with Town Ambassadors
● Town Map produced and circulated to visitors and businesses
● Love Oban Brand and voucher sales in excess of £100K 
● Christmas lights and trees investment
Page 421

Page 412

● Port of Oban Cruise Group developed
● Support for Small Cruise Ships using pontoons
● Welcome provided for over 150 cruise ships arriving in Oban
● 12 Accredited Yellow Badge Tour Guides providing over 200 walking tours
● 3600 Hanging baskets produced and installed over ten years
● Fireworks Displays 5th November, Hogmanay, generating substantial economic
impact.
● Storm Puppet Event October 2021 created £20 000 of direct benefit to businesses
across the town.
● Green Machine Cleaning Partnership with A&B
● First point of contact for businesses and A&B if required
● BID4Oban Town Markets Introduced
● Motorfest an annual event
● North Pier Pontoons direct partnership with A&B
● Oban Tour Guides – Cruise Ship Business – We now deal directly with visiting cruise
ships and offer walking tours of the town.
● Almost every railing and bollard in the town was painted!
● Full Town Wi-Fi
● 8.9 million pageviews on Oban.org.uk from over 987,000 users.
● AITC partnership - £30K funding in the first term of BID
● AITC Funding £50,000 in the second term of BID
● Introduction of Oban International Shanty Festival
● Proposed introduction of Oban Food Festival in 2023 
*A&B Argyll and Bute Council
Other Projects and Impacts
● Oban as University Town – Involvement in this initiative to bring united thinking to
education within Oban.
● Greater promotion & use of Love Oban Vouchers
● BID office used by businesses and partners, hot desking business hub
● Oban Winter Festival – £1.2M PA x 9 years 
● Oban Live - £1.4M PA x 4 Years (due back 2023)
● OLTA/AITC Funding & Marketing -£10M PA
● Port of Oban Cruise Group £1.2 PA (Estimate)
● Oban Pontoons £3M PA (Estimate)
● BID4Oban Services £0.5M PA
● BID4Oban Town Improvements £1M PA
● A BID should be inclusive of all parties. Council, Tourism, Business, Community
Groups.
● A BID can leverage substantial additional funding from the Scottish Government,
Scotland’s Towns Partnership 
Page 422

Page 413

COVID 19 Response
● Took a lead within the business community from the start
● Conduit between A&B and Business Community 
● Grant Support
● Business advice through A&B resilience forum 
● Pan Argyll business forum through HIE 
● Provided COVID signage and support to every business
● Shop Local, Stay Local, Support Local Campaign 
● New BID4Oban website 
● Revitalised  www.oban.org.uk to benefit tourism and services across Oban 
● Support provided through Oban CBT Clinic funded by Scotland’s Towns Partnership
Page 423

Page 414

BID4Oban Area and Map
Airds Crescent
Albany Street
Albert Lane
Albert Road
Alexandra Road
Angus Terrace
Aray Gardens
Ardconnel Road
Ardconnel Terrace
Argyll Square
Argyll Street
Balvicar Road
Bayview Road
Ben Cruachan View
Benvoullin Gardens
Benvoullin Road
Breadalbane Lane
Breadalbane Street
Burnside Place
Campbell Crescent
Campbell Street
Castle Road
Coe Gardens
Colonsay Terrace
Combie Street
Corelli Court
Corran Brae
Corran Esplanade
Craigard Road
Craighouse Avenue
Crannaig-a-Mhinister
Crannog Lane
Creag An Airm
Creag Bhan Village, No's 1-28
Creag Bhan Village, No's 29-60
Creran Gardens
Croft Avenue
Croft Road
Cruachan Crescent
Dalintart Drive
Dalriach Park Terrace
Dalriach Road
Davaar Gardens
Deanery Brae
Drimvargie Road
Drummore Road (part)
Duncraggan Road
Dunuaran Road
Etive Gardens
Feochan Gardens
Fladda Road
Gallanach Road
Ganavan Road
Page 424

Page 415

George Street
Gibraltar Street
Glencruitten Court
Glencruitten Drive
Glencruitten Rise
Glencruitten Road
Glengallan Drive
Glengallan Road
Glenmore Road
Glenshellach Business
Park, Footpath
Glenshellach Business
Park, Roads
Glenshellach Industrial
Estate Road
Glenshellach Road
Glenshellach Terrace
Grianach Gardens
Haggarts Brae (Footpath)
Hazeldean Crescent
High Street
Hill Street
Hynish Crescent
Hyskeir Gardens
Iona Drive
Islay Road
Jacob's Ladder
John Street
Jura Road
Kerrera Terrace
Knipoch Place
Laggan Road
Laurel Crescent
Laurel Road
Lawe Road
Lismore Crescent
Lochavullin Drive
Lochavullin Road
Lochside Street
Lonan Drive
Longsdale Crescent
Longsdale Road
Longsdale Terrace
Lorn Avenue
Lunga Road
Lynn Court
Lynn Gardens
Lynn Road
Market Street
McCaig Road
McCall Terrace
Mill Lane, Lochavullin
Miller Road
Millpark Avenue
Millpark Place
Millpark Road
Morvern Hill
Mossfield Avenue
Mossfield Drive
Mull Terrace
Nant Drive
Nelson Road
North Pier
Nursery Lane
Orchy Gardens
Park Hotel Lane
Polvinister Gardens
Polvinister Road
Pulpit Drive
Pulpit Road
Pulpit Rock
Quarry Road
Rhuvaal Road
Rockfield Road
Rowan Road
Scalpay Terrace
Scarba Terrace
School Brae
Shore Street
Shuna Terrace
Sinclair Drive
Skerryvore Gardens
Soroba Hill Road
Soroba Lane
Soroba Road
Stafford Street
Star Brae
Station Road and Queen's
Park Place
Stevenson Street
Taylor's Brae
The Greens, Glencruitten
Tower View
Tweeddale Street
Ulva Road
Ure Gardens
Villa Road
William Street 
Information on Levies 
Who will pay the levy and how much will it cost?
A BID Levy is an equitable and fair way of funding additional projects and services
that the local authority is not required to provide. Improving your trading
environment could be made possible through a successful BID generating some
£168,362 per annum for business improvements.
• Levy payments will be made by those liable to pay non-domestic rates
Page 425

Page 416

with a rateable valuation of £3,000 or above and will be made by the
occupiers (as the eligible persons) only, except for vacant premises when
the property owner will be liable for the Levy payment.
• The Improvement Levy is not linked to what businesses actually pay in
rates but is based on the rateable value of the property. 
The following table shows the modest cost that your business would have to pay and
is based on the SSA Valuation Roll rateable valuation of your property on the ballot
date. 
RV Range Annual Levy Per Business Cost Per Business
£3,000 – £8,399 £150.00 £2.90
£8,400 – £13,399 £250.00 £4.23
£13,400 – £39,999 £380.00 £7.30
£40,000 – £65,999 £530.00 £10.20
£66,000 – £99,999 £890.00 £17.12
£100,000 – £179,999 £1030.00 £19.80
£180,000 – £499,000 £2300.00 £44.23
£500,000+ £5000.00 £96.15 
The table has been developed based on calculating the average median value for all
rateable properties in the area, which is £9,900. We believe that £250 per year is a
reasonable and affordable Levy charge for the ‘average’ business but have
acknowledged that very low rateable values should pay less. Broad ‘uplifts’ for
bandings above this level have then been set to reflect the size of the business and
have allowed for all multiple retailers to be included as Levy payers. 
Levy payment
A BID levy is an equitable and fair way of funding additional projects and services, which the local
authority and other statutory bodies are not required to provide.  There are approximately 550*
commercial properties in the BID area which will generate a BID investment levy income of
approximately £168,362 per annum and an estimated total levy income of £841,810 over 5 years.
It has been agreed by the BID Board the levy structure will remain the same banded system based on
the rateable value (RV) of the property on the day of the ballot 08/12/2022 and throughout the 5-year
term of the BID and: -
Page 426

Page 417

 The BID levy will be paid by the occupier (the eligible person liable to pay the non-
domestic rate), however, the property owner will be liable to pay the levy where a
property is vacant on the day the levy invoice is issued and for all the period thereafter
when the property is vacant. 
 It has been agreed by the BID Board, the levy will be calculated on the Rateable Value of
the properties in the BID area on the day of the ballot and will not change during the 5-
year term unless there is a property rates revaluation in which case the levy will be re-
calculated and based on adjusted property rateable values. 
 All eligible occupiers (of eligible properties) i.e., the eligible person liable to pay the non-
domestic rate that are listed on the Local Assessors Valuation Roll on the ballot date will
be liable to pay the levy. 
 The levy payments are not linked to what businesses pay in rates but are based on the
rateable value of the property. 
 The levy must be paid either in one payment within 28 days from the date of the levy
invoice or in 10 instalments by arrangement with the billing body. The Levy must be paid
in one payment for accounts of £150 per annum. 
 If there is a change, in occupier to a property, until a new occupier is found, the property
owner will be responsible for paying the levy.   
 If there is a change or several changes in the occupier of the property within the BID area,
no rebate of under £150 will be given to any outgoing occupier since this would be
uneconomic to administer. The property owner will then be responsible for paying the
Levy until a new occupier is found. 
 Any new commercial development, subdivision of existing properties or merging of
properties or new business with a non-domestic rateable valuation coming into the area
during the 5-year term of the business improvement district will be liable for the BID
Improvement Levy. 
 If a property is vacant on the date the levy is issued and for any subsequent vacant periods,
the property owner will be liable for the full levy amount, which must be paid within 28
days. 
 Self-catering holiday accommodation which is not the sole or main residence of any
person and which is available (or intended to be available) for letting on a commercial
basis, with profit in mind, for short periods totalling more than 140 days in the financial
year remain liable for non-domestic rates for the whole year and will be included. 
Page 427

Page 418

 The levy will apply to properties with a rateable value of £3000 and above. Levy bandings
will be applied with a maximum banding at £500,000 and above. 
 The BID levy will not be index-link to the Retail Price Index (RPI) - Consumer Price Index
(CPI) to take account of inflation, so that those liable to pay the levy can budget
accordingly for the full five-year term. 
 Council and government agencies will also pay the Levy. 
Levy Collection
Argyll and Bute Council will be appointed to issue businesses in the BID area with a
separate Levy invoice under the heading Business Improvement District Levy. All
income collected under the ‘BID Levy’ will be kept in a separate BID Revenue Account
and passed to the BID Company to be used only for BID projects and services. The
BID Levy cannot be used as an additional source of revenue for the Council.
Any non-payment of the BID Investment Levy will be pursued, and statutory powers
will be enforced to ensure fairness to those businesses that have paid the Levy 
Exclusions
The BID Board decided to exclude premises that have a rateable value of less than £3000.  These
premises can pay a voluntary levy and become an “associate member” should they wish, by contacting
the BID4Oban team.
The BID Board decided that there is no benefit from being part of the BID to the following categories
of property and therefore are exempt from paying the levy Ad-spaces, Nursing Homes, Non-Retail
Charity, Places of Worship, Health Care Centre, the Community Employment Trust and the Girl Guide
Association.  
Enforcement
In the event of any non-payment of the BID improvement levy, it will be strongly pursued by Argyll
and Bute Council (as the billing body) using the recovery powers available to the Council to ensure
complete fairness to all the businesses that have paid. Argyll and Bute Council will be entitled to charge
an additional fee to the levy amount to meet any additional costs incurred in the recovery of the levy. 
BID4Oban adds value 
A Service Level Agreement is a baseline of information which details what the
Council, the Police and Transport Scotland (which is responsible for the A85
trunk road running through the town) currently deliver. It also gives an
assurance to the Levy payers that the current statutory level of service to the
BID area will not be reduced after a successful ballot.
Page 428

Page 419

Services already provided by Argyll and Bute Council:
• Street Furniture: benches, finger posts (directional signage), bins,
bollards
• Planting and Grounds maintenance: seasonal planting, maintenance of
grassed areas and ground maintenance plots
• Waste removal: charged trade waste collection and disposal service
• Street Lighting: installation, management and maintenance
• Road and pavements maintenance: including repairs and winter road
and footpath maintenance
• Car Parks: Council operated off-street car parking
• Public toilets
• Piers maintenance: maintenance of North Pier, Oban Times slip and
Port Beag. 
Services already provided by Transport Scotland. ALL
relating to trunk road:
• street lighting on trunk road
• road and pavements maintenance on trunk road
• winter maintenance of trunk road
• grass cutting and weed control at the side of trunk road
• gully cleaning to ensure free flow of stormwater. 
Services already provided by Police Scotland:
• provision of dedicated town centre officers at peak times, to address
particular issues or to cover specific events
• increasing town centre foot patrols over the busy festive period to
ensure that crimes in Oban are prevented
• working closely with licensed premises to ensure that the town centre
is a safe place to be at night. 
The number of officers on duty at any time, varies dependent on recognised
demands and initiatives but targeted action will always be taken to impact on
the policing priorities identified by the community, including the BID, to
ensure that officers are in the right place at the right time. 
Page 429

Page 420

Management of the BID 
Following a successful yes vote, the management and operation of the BID will continue under the
existing company structure and name, BID4Oban Ltd company number 435469, which will operate
from 09/12/2022.     
The Company will continue to be managed by its Board of Directors operating in an open and
transparent way and answerable to the businesses in the area. The Directors are committed
to the highest standards of management, governance, and accountability; recognizing good
governance helps deliver the strategic objects of the company. 
There will be a detailed set of protocols (the Operating Agreement) which will cover, as well as other
items, the billing, collection, and transfer of the levy to the Company. 
The Board of Directors may consist of up to twelve directors, of which there are currently 6 in office.
An active campaign will be launched during and after the successful ballot to recruit additional
directors to the Board. Every eligible person that pays the levy will have the opportunity to nominate
themselves or someone else from within the BID area to be elected to the Company Board but limited
to one eligible person from each eligible property. 
Nominations of directors, representatives, or advisors from outside the BID, who do not pay the levy
and who may or may not represent those making voluntary or other financial contributions toward
the BID, will be strictly at the discretion of the Board of Directors.   
The Company will continue to be run by the businesses for the businesses. This Board will be
responsible for all decisions relating to staff, contracts, the delivery of the approved business plan and
other activities generated by the BID.
The Board will be representative of the businesses and stakeholders in the area. The Chair, Vice Chair
and Finance Director will be elected from the directors of the Board. The Board will include two
representatives from Argyll and Bute Council. Other non-voting members or local groups may be co-
opted onto the Board at the Board’s discretion. 
The BID Company Board will have the authority to adapt or alter the projects and services from year
to year to reflect any change in economic circumstances or any new opportunities that may arise. This
will be in the best interests of the levy payers and without recourse to an alteration ballot.
Additionally, the BID Company Board reserve the right to consider creating a charitable arm of the
company to enable it to secure additional funding, which can only be sourced with charitable status. 
Pre-Ballot
The BID Proposer must submit, at least 98 days in advance of the ballot date, the BID Proposals to the
Local Authority, the Scottish Ministers and the billing body along with a letter detailing their intention
to put the BID Proposals to ballot. The local authority has then, 28 days in which to veto or not veto
the BID Proposals.
A ‘Notice of Ballot’ will be issued at least 42 days before the day of ballot. 
Page 430

Page 421

The BID Proposer will make available a copy of the BID Proposal to any person, who is eligible to vote
on the BID Proposals, who requests a copy.  
Ballot process
 Ballot papers will be posted to the eligible person responsible for casting a vote within
their business at least 42 days before the day ballot. In the case of national companies,
the responsibility for voting may lie with head office. 
 Prior to or on the date the ballot papers are issued the BID Proposer will provide to all
those eligible to vote in the ballot, with a copy of the BID Business Plan. 
 The BID ballot is a confidential postal ballot conducted by Argyll and Bute Council on
behalf of BID4Oban BID and in accordance with Scottish BID legislation. 
 Where an eligible property is vacant the voting papers will be sent to the property owner. 
 In BID4Oban case, voting papers will be issued no later than 27/10/2022. 
 The last date for all ballot papers to be returned is 5pm on 08/12/2022.  Papers received
after this date and time will be deemed null and void and not be counted. 
 Voting papers are easy to complete, simply place a cross on either “yes” or “no” to the
question “are you in favour of a BID?” The ballot paper must then be signed by the person
eligible to vote and returned in the pre-paid envelope. 
 For the ballot to be successful there must be a minimum turnout of 25% (the headcount) by
number of eligible persons and by combined rateable value; and of those who turnout, the
majority must vote in favour by number and rateable value. 
 All eligible persons (i.e., those persons liable to pay non-domestic rates) will have one vote
or where a person is liable for non-domestic rates for more than one property, that
individual shall be eligible to cast more than one vote however they will be required to
pay the levy for each of the properties that they occupy. 
 The ballot papers will be counted on 08/12/2022 and the results announced by the Argyll
and Bute Council within one week. 
 Following a successful ballot, the BID will commence on 09/12/2022 and will run for a
period of five years until the 08/12/2027
Page 431

Page 422

Ballot Timetable
27th October 2022. Ballot papers and business plan posted to all voters.                                 
42 Days for voters to return their voting papers.
8th December 2022.  At 5pm the Ballot Closes.
9th December 2022. Ballot papers counted and result announced.
Consultation process 
The BID consultation was undertaken with a broad cross-section of businesses in the
form of one-to-one interviews, a series of open meetings and several electronic
communications.
The initial BID consultation focussed on in-person meetings at The Rockfield Centre,
consisting of 5 open sessions across the week which were publicised through email,
Facebook and The Oban Times. 
Consultation was also made in the form of a survey which was sent to all businesses on our
Levy Payer database via email, as well as follow-up visits and phone calls to encourage them
to take part. Of the 60 responses received, 59 answered the question below, resulting in
83.1% stating that they would vote in favour of the BID returning until 2027. 
The survey also returned 9 names of levy payers expressing an interest in becoming a
director of BID4Oban which was very encouraging, and these people will be contacted
directly. 
The overall aim of the consultation was to assess opinions on ways to enhance and
improve the BID area and give more incentive to visit and invest in the town centre.
The results of these surveys and consultations have been combined and form the
basis of the Business Plan and BID Proposal.
Businesses have received emails, telephone calls, newsletters, newspaper articles,
one-to-one visits throughout the BID term and the consultation process to keep
them informed of progress. The website www.bid4oban.co.uk has been kept fully
Page 432

Page 423

updated with information throughout the development of the BID.
The Board of Directors considered the response from the one-to-one consultations,
surveys and public meetings as sufficient to decide on the projects and services
proposed in the business plan. 
Overall, the most important areas a BID could improve on were recognised as: 
1. Access and traffic management
2. Marketing and promotion
3. Clean and attractive
4. Business support
5. Training initiatives 
6. Lobbying and a Business Voice
7.          More green initiatives around the town 
From the surveys, it was determined that levy payers wanted: 
A well promoted and vibrant town
Help for businesses to become more sustainable  
To attract more visitors and see increased spending 
A raised profile for the town by closer working with Wild About Argyll 
Help to resolve parking issues addressed within the BID area
To create a cleaner, greener and more attractive town centre
To extend the season with more events in the quieter months
A more diverse High Street to attract customers
Improved business support and advice
To promote the town as a business centre as well as a tourist destination 
BID4Oban Objectives 
Objective 1: Events Lets Shout About Oban 
Project Cost from Levy Timing Measurement Benefit to Levy
Payer
Winter Festival
Reindeer
Parade
£25,000 2022-2027 Attendance
4000 per-
annum
Attracts people to
the town during
shoulder months.
Page 433

Page 424

Fireworks
(5/11)
£15,750 2022-2027 Attendance
4000
Increased Footfall
before, during and
after the event.
Fireworks
Hogmanay 
£14,750 2022-2027 Not measured Spectacular display
that attracts many
visitors at the end of
the festive season.
Oban
International
Shanty Festival
£17,000 2022-2027 Ticket sales,
amount of
visitors to the
town
Anticipated increase
in visitors who in
turn spend across
local businesses
Oban Live £30,000 2022-2027 Tickets sold Generates in excess
of £1.8M to Oban
economy
Motorfest &
Clan Stunt Show
£7,500 2022-2027 Amount of
vehicles
exhibiting
Increased town
centre footfall on
shoulder weekend.
Oban Sportive £8,000 2022-2027 Amount of
entrants
In excess of 170
entrants, the vast
majority spending
two nights on local
accommodation
New Events
Fund
£32,000 2022-2027 Number of new
events created
Encourage improved
footfall. 
Objective 2: Environment 
Project Cost from Levy Timing Measurement Benefit to
Levy Payer
Floral
Enhancements 
£35,000 2022-2027 Number of
displays across
town
Whole town
solution and
improved
ambiance
Business
Improvement
Grants
£40,000 2022-2027 Amount of
grants awarded
Properties
improved, cost
to levy payer
Page 434

Page 425

reduced and
improved
ambiance
Festive and
Town
Decorative
Lights
£35,000 2022-2027 Increased and
improved
amount of
festive and
decorative lights
Improved
ambiance
encouraging
locals and
visitors to enjoy
town
Environmental
Improvement
Fund
£10,000 2022-2027 Number of
awards made
Improves
greener agenda 
Objective 3: Marketing Locally   
Project Cost from Levy Timing Measurement Benefit to
Levy Payer
Town Centre
Ambassadors
£67,500 2022-2027 Number of visitor
interactions
Enhanced
Visitor
Experience.
Love Oban
Voucher
Scheme
£7,000 2022-2027 Number of
vouchers sold
Encourages
users to shop
locally.
Scotland Loves
Local Card
£5,000 2022-2027 Amount of
businesses
accepting cards
Ensures local
businesses
benefit from
council run
voucher
scheme.
Advertising and
promotion
£15,500 2022-2027 Improved
marketing of BID
Events
Improves
footfall to levy
payers 
Objective 4: Working Together 
Project Cost from Levy Timing Measurement Benefit to
Levy Payer
Page 435

Page 426

AITC (Argyll &
Isles Tourism
Cooperative)
£50,000 2022-2027 Increased visitors
to town along
with high level
marketing.
Increases
footfall
Town WIFI £15,000 2022-2027 Amount of
connections
Directs users to
Love Oban Site
and businesses
Love Oban
Website
(Oban.org.uk)
£24,720 2022-2027 Maintain
number 1 Google
placement
Provides
information to
visitors
regarding town
business,
attractions,
events and
activities. 
BID4Oban Budget and Expenditure 
BID Budget Income 
Income Year 1 Year 2 Year 3 Year 4 Year 5 Total
Income
from BID
Levy
£168,362 £168,362 £168,362 £168,362 £168,362 £841,810
Argyll and
Bute
Council
Income
£20,000 £20,000 £20,000 £20,000 £20,000 £100,000
Income
Total
£188,362 £188,362 £188,362 £188,362 £188,362 £941,810 
BID Budget Expenditure 
Expenditure Year 1 Year 2 Year 3 Year 4 Year 5 Total
Events £30,000 £30,000 £30,000 £30,000 £30,000 £150,000
Page 436

Page 427

Environment £24,000 £24,000 £24,000 £24,000 £24,000 £120,000
Marketing
Locally
£19,000 £19,000 £19,000 £19,000 £19,000 £95,000
Working
Together
£17,944 £17,944 £17,944 £17,944 £17,944 £89,720
Running Costs £69,000 £69,000 £69,000 £69,000 £69,000 £345,000
Contingency £8,418 £8,418 £8,418 £8,418 £8,418 £42,090
Total £168,362 £168,362 £168,362 £168,362 £168,362 £841,810 
Current Board of Directors 
Tony Cave 
John Forbes
Fergus Murray
Ian Clunie 
Gregor MacKinnon 
Contacts
Andrew Spence, BID Chief Executive 
T: 01631 569915
E: andrew.spence@bid4oban.co.uk  
43 Stevenson Street, Oban, PA34 5NA 
Page 437

Page 428

This page is intentionally left blank

Page 429

Appendix 4 – Oban Bid Levy Payers 
Document too large to include with agenda pack and is available on request from
Committee Services.
Page 439

Page 430

This page is intentionally left blank

Page 431

BID4OBAN LTD, 43 Stevenson Street, Oban, Argyll PA34 5NA. 
Tel. 01631 569915. www.bid4oban.co.uk. Email: andrew.spence@bid4oban.co.uk
Chief Executive - Andrew Spence, Chairman – Antony Cave   Company no. SC435469   VAT NO: 152327236 
Pippa Milne
Chief Executive
Argyll and Bute Council
Kilmory
Lochgilphead
PA31 8RT 
1st September 2022 
Dear Pippa 
Planning etc. (Scotland) Act 2006
Business Improvement Districts (Scotland) Regulations 2007 
BID4Oban Ltd Business Improvement District - Formal Submission of BID Proposals to the Local
Authority and the Scottish Government 
We refer to the above legislation, which requires the BID Proposer to notify you in writing that we wish to put
the BID4Oban Ltd BID Proposals to a ballot. 
This letter is our formal request for Argyll and Bute Council, to instruct the ballot holder to put the BID
Proposals to a ballot on the 8th December 2022. 
Will you kindly acknowledge receipt of this letter. 
Yours sincerely, 
Yours sincerely, 
Andrew Spence
Chief Executive 
CC:
Karl Blomer – Scottish Government
Phil Prentice – Chief Executive Scotlands Towns Partnership 
Bill Harvey -Scotlands Towns Partnership 
Page 441

Page 432

BID4OBAN LTD, 43 Stevenson Street, Oban, Argyll PA34 5NA. 
Tel. 01631 569915. www.bid4oban.co.uk. Email: andrew.spence@bid4oban.co.uk
Chief Executive - Andrew Spence, Chairman – Antony Cave   Company no. SC435469   VAT NO: 152327236 
Page 442

Page 433

Argyll and Bute Council 
Baseline Service Agreement 14th June 2022 
Service Area: - 
Activity Area  Pier and harbour maintenance
Statutory/Non-statutory
Service
Non Statutory
Description/Specification Provision and maintenance of pier, pontoons, slipway and
harbour facilities. In addition to a general duty of care,
legislation provides the basis for powers and duties relating to
these activities, including work to Harbour and Docks Act
1847, Harbour Bylaws and Anti-Terrorist legislation
concerning Marine Port Security.
Contact Scott Reid  – Marine Operations Manager  01546 604696
Scott.reid@argyll-bute.gov.uk 
Existing Activity Works managed and carried out by Argyll & Bute Council staff
Operational Times Core hours 9am – 5pm Monday – Friday but with significant
variances to suit peaks of activity e.g. at weekends and during
summer months.
Staffing and Equipment
Levels
Harbourmaster and office, equipped with range of
communications equipment.
Oil spill response equipment.
The council has a responsibility to ensure piers within its
ownership are maintained in a serviceable condition.  In Oban
these are the North Pier including the transit berthing facility,
Oban Times Slip, and Port Beag. 
The harbourmaster is responsible for coordinating vessels
which are berthing at the council’s piers and collection of
harbour and gangway dues.  Provision of freshwater.
Waste management facilities are provided for vessels using
council piers and slips.
Key Performance
Indicators
N/A 
Legislation/Policy N/A
Existing Value of
Contract/Service
N/A 
Boundary Area SHA area round North Pier
Non-compliance
Procedure
N/A 
Additional Information or
Notes
None 
Page 443

Page 434

Service Area: - 
Activity Area  Trading Standards & Advice Services
Statutory/Non-
statutory
Service
Statutory and Non Statutory
Enforcement functions are (mainly) statutory, consumer advice functions
are (mainly) non-statutory
Description/Spe
cification
The Council either (in its role as a Local Weights & Measures Authority
or directly) has a duty to enforce consumer protection legislation. Trading
Standards Officers enforce this legislation. Trading Standards also carry
out (non-statutory) scam prevention & consumer education work.
Advice Services provide Debt Counselling & Welfare Rights advice to
consumers.
Contact Lee Roberts lee.roberts@argyll-bute.gov.uk 01546604779
Existing Activity • Programmed metrology, product safety, age-related sales & fair
trading inspections and revisits to businesses within the area.
• Programmed visits to relevant Animal Feed premises on behalf
of and under a contract with Food Standards Scotland
• Investigation of criminal complaints relating to Trading Standards
legislation
• Monitoring of civil law complaints against local traders for
Enterprise Act purposes
• Licensing & Certification of petrol sites. Inspection of Licensed &
Certificated premises
• A program of “test purchases” to ensure compliance with TS
legislation 
• Scam prevention work
• Protection of vulnerable consumers through supplying & fitting
callblockers
• Provision of money advice and debt counselling to consumers
• Assisting consumers to obtain Debt Arrangement Schemes,
Bankruptcies etc
• Provision of Welfare Rights advice
• Representation of clients at appeals & tribunals
Operational
Times
Core 9am – 5pm Monday – Friday. 
Staffing and
Equipment
Levels
3 staff are physically based in Oban. Overall provision in OLI includes:
Debt Counselling 0.25 FTE
Trading Standards 0.75 FTE
Welfare Rights 1.0 FTE
Key
Performance
Indicators
LRS102_01 Advice and assistance from Welfare Rights is provided to
Clients to ensure they maximise their income.
ENV5 ‐ Cost  of trading standards and  environmental  health per 1,000
population
ENV5a - Cost  of trading standards per 1,000 population 
There are also Welfare Rights targets set out in the Local Housing
Strategy:
Page 444

Page 435

• LHS Outcome 2 – To regenerate communities by improving the
quality, condition and energy efficiency of housing and by
tackling fuel and child poverty. 
Key target: Income maximisation – Minimum of £10m generated
via Welfare Rights activity by 2027
• LHS Outcome 3 – to enable people with particular needs to live
independently in their own homes and to remain in their
communities                                                                                 
Key target - Continuing to work with Care & Repair and other
partner agencies to deliver effective services across Argyll & Bute
that support independent living;
Legislation/Polic
y
Relevant legislation as listed on Trading Standards authorisations.
Council policies re providing consumer education, welfare rights advice
& debt counselling advice. 
Existing Value
of
Contract/Service
N/A
Boundary Area All activity within or adjacent to BID area 
Non-compliance
Procedure
N/A 
Additional
Information or
Notes
N/A 
Service Area: - 
Activity Area  Roads, pavements and carpark maintenance (including
winter maintenance)  Car Park maintenance carried out by
Operations but instructed by Network and Standards –
Hugh O’ Neill
Statutory/Non-statutory
Service
Statutory
Description/Specification Maintenance of roads, pavements and carparks.  In addition to
a general duty of care, legislation provides the basis for powers
and duties relating to Road Maintenance.  Primarily the Roads
(Scotland) Act 1984 and The New Roads and Streetworks Act
1991.
Scheduled maintenance activities include:  drainage works,
patching, pavement maintenance, signage, gritting and winter
maintenance.
Major resurfacing works are also scheduled when capital
budget is made available.   
Page 445

Page 436

Inspection
Roads – annual survey by contractor (WDM), followed by more
detailed inspection where potential defect development has
been identified.  Also inspection for safety defects at intervals
laid down in maintenance plan.
Culverts and manholes – inspect and clean annually
Gullys – inspect and clean 3x in two years
Fences/barriers/railings  – inspected every two years
Contact Tom Murphy – Operations Manager 0141 658908 
Tom.murphy@argyll-bute.gov.uk 
Hugh O’Neill – Network and Standards Manager 01546
604084 (Car Parks)
Hugh.o’neill@argyll-bute.gov.uk 
Existing Activity Works managed and carried out by Argyll & Bute Council staff,
with specialist contractors brought in when necessary. 
Operational Times Core  8am – 4pm Monday – Friday
Winter maintenance times (winter gritting) may be outside
these hours in accordance with the weather pattern.
Staffing and Equipment
Levels
A road’s maintenance team is based in Oban but carries out
further work beyond the perimeter of the BID area.  
Within the bid area there are 36.4km of adopted roads 
Full time equivalent staff = 4 (dependant on variances in annual
capital works such as major road resurfacing) A variety of
vehicles are available to be deployed depending on type of
works being undertaken.
The trunk road network is maintained by Transport Scotland  In
Oban this is the A85, George Street, Esplanade, Airds Place
and Stafford Street (west of George Street)
10 Pay & Display car parks are provided and managed within
the BID area, with plans to convert 2 more to Pay and Display.
(Now converted).
Car Park locations:
Ganavan  P&D
Corran 1 Seasonal P&D
Corran 2 P&D
Longsdale coach park P&D
Longsdale car park FREE currently, but plan to convert to P&D
(Now converted).
Esplanade P&D
North Pier P&D
Albany Street P&D
Market Street P&D
Lochavuillin car park FREE currently, but plan to convert to P&D
(Now converted).
Lochavuillin coach/lorry park – P&D
Tweedale Street – P&D
Key Performance
Indicators
Key Performance Indicators collated and reported.
Quality inspections carried out by supervisory staff and
rectification action taken where necessary.
Page 446

Page 437

Category 1 defects should be made safe within 24 hours of
identification.  Others will be inspected and dealt with as
resources permit.
Legislation/Policy  Duty under the Roads (Scotland) Act 1984: a local roads
authority shall manage and maintain all such roads in their
area.
Existing Value of
Contract/Service
£83,000* (including winter gritting operations) 
Boundary Area All roads, pavements and carparks within the BID area, with
the exception of those managed by Transport Scotland 
Non-compliance
Procedure
N/A
Additional Information or
Notes
* Cost shown is an approximate value based on revenue budget
allocation for service provision in the Lorn area.
Capital expenditure in the BID area is determined in
accordance with the council’s service asset management plan
and will vary from year to year, being additional to the revenue
figure if such works are scheduled. 
Service Area: - 
Activity Area  Street lighting maintenance
Statutory/Non-statutory
Service
Statutory
Description/Specification Provision and maintenance of street lighting and associated
electrical control boxes. 
Contact Tom Murphy – Operations Manager 01436 658908
Tom.murphy@argyll-bute.gov.uk 
Existing Activity Works managed and carried out by Argyll & Bute Council staff
Operational Times 8am – 4pm Monday - Friday
Staffing and Equipment
Levels
Electrical maintenance is carried out by staff shared with other
areas.  There is no permanent presence in the town. 
Within the bid area there are 1844 electrical units (including
traffic control, street lamps and junction boxes) maintained. 
Typically, duties are reactive and include a variety of electrical
and lighting repairs, along with programmed maintenance
works.
Inspection - Lighting columns are inspected a minimum of every
four years.  
Page 447

Page 438

Full time equivalent staff =0.5 equipped with specialist lighting
platform. 
Lighting along the trunk road network is maintained by
Transport Scotland  In Oban this is the A85, Dunollie Road,
George Street, Esplanade, Airds Place and Stafford Street
(west of George Street)
Key Performance
Indicators
Key Performance Indicators collated and reported.
Quality inspections carried out by supervisory staff and
rectification action taken where necessary
Response time for defects is within 5 working days and this is
currently being achieved at a level of 71%
Legislation/Policy  Under Section 35 of the Roads (Scotland) Act 1984, Argyll and
Bute Council has a duty to “provide and maintain lighting for
roads which are maintained by them and which in their
opinion ought to be lit”
Existing Value of
Contract/Service
£10,000* 
Boundary Area Lighting to all roads, pavements and carparks within the BID
area, with the exception of those managed by Transport
Scotland.
Non-compliance
Procedure
N/A
Additional Information or
Notes
* Cost shown is an approximate value based on revenue budget
allocation for service provision in the Lorn area.
Capital expenditure in the BID area is determined in
accordance with the council’s service asset management plan
and will vary from year to year, being additional to the revenue
figure if such works are scheduled. 
Service Area: - 
Activity Area  Street Cleansing and Litter Bin Emptying 
Statutory/Non-statutory
Service
Statutory
Description/Specification Litter control around the BID area in compliance with EPA
requirements.  To clean all routes to the required standard (A
Standard) of cleanliness, being free of litter and refuse at the
end of each sweep. Attention to dog fouling, flyposting, graffiti,
and fly tipping as required.  Education and Enforcement
actions.
Contact Paul Martin – Assistant Operations Manager 01546 604619
Paul.martin@argyll-bute.gov.uk 
Existing Activity Works managed and carried out by Argyll & Bute Council staff,
seven days a week.
Operational Times Street Cleansing 
Page 448

Page 439

Mon to Thurs 07:00 - 1500, Friday 07:00 – 14:30 
2 x manual barrow sweepers
Wednesday – Saturday 07:00 – 15:00, Sunday 07:00 – 14:30
1 x manual barrow sweeper  
Friday – Monday 07:00 – 15:00, Tuesday 07:00 – 14:30
1 x manual barrow sweeper  
Litter bin emptying (42 throughout the BID area)
Summer – once per day, more frequently as required or
directed by supervisor.
Winter – 3 times per week, more frequently as required or
directed by supervisor
Staffing and Equipment
Levels
Full time equivalent staff allocated to BID area = 4 
Key Performance
Indicators
LEAMS (Local Environmental Audit and Management System)
Street cleansing monitoring assessments twice per year by
external monitors. (Local Authority and Keep Scotland
Beautiful)
LEAMS cleanliness inspections monthly by in-house staff. 
LEAMS values  are consistently in the mid-70s over the last
year, comparable with the national standard of 74 (2010/11)
Legislation/Policy  Section 89 Environmental Protection Act 1990
Existing Value of
Contract/Service
£132,000 
Boundary Area All roads within the BID area
Non-compliance
Procedure
Sites which fail to meet required standards are attended to
within 24hrs
Additional Information or
Notes
Main litter sources are smoking, drinks, fast food and
confectionary related.
* Cost shown is an approximate value based on revenue budget
allocation for service provision in the Lorn area.
Capital expenditure in the BID area is determined in
accordance with the council’s service asset management plan
and will vary from year to year, being additional to the revenue
figure if such works are scheduled. 
Service Area: - 
Activity Area  Commercial Waste Collections*
Statutory/Non-statutory
Service
Statutory
Description/Specification Collection and disposal of commercial waste, including
recyclables (paper/card/can/plastic/glass, in line with individual
commercial waste contracts.
Contact Paul Martin – Assistant Operations Manager 01546 604619
Page 449

Page 440

Paul.martin@argyll-bute.gov.uk 
Existing Activity Works managed and carried out by Argyll & Bute Council staff,
five days a week.
Collection and disposal of commercial waste from 373 business
premises, including commercial recycling
(paper/cardboard/cans/plastic) collection in line with individual
contract agreements.
Servicing of commercial glass bins is carried out by Greenlight
on the council’s behalf.
Operational Times Core 7am – 4pm Monday – Friday.  Special services as
required.
Staffing and Equipment
Levels
3 operatives, 1 refuse vehicle 3 days per week 6.5 hours per
day (Monday, Wednesday, Friday), 1 paper collection vehicle
1hour per day 5 days per week, 1 multilift/skip vehicle for
special uplift as requested.
Full time equivalent staff on commercial waste collection in
BID area =  1.8
Key Performance
Indicators
Collation of missed bin reports 
Legislation/Policy  Waste Scotland Regulations
Existing Value of
Contract/Service
£747,000 
Boundary Area All contracted premises within the BID area
Non-compliance
Procedure
N/A 
Additional Information or
Notes
*domestic waste collection is additional to this service but has
been requested not to be included within this documentation.
Contract value shown is the total charged to customers. 
Service Area: - 
Activity Area  Horticultural and Grounds Maintenance Works
Statutory/Non-statutory
Service
Non Statutory
Description/Specification The council carries out planting of seasonal bedding,
maintenance of shrub beds, grass cutting, hedge trimming,
hard surface management (sweeping of paths etc.), tree
maintenance and maintenance of sports pitches.  
Contact Paul Martin – Assistant Operations Manager 01546 604619
Paul.martin@argyll-bute.gov.uk
Page 450

Page 441

Existing Activity Works managed and carried out by Argyll & Bute Council staff,
five days a week. 
This includes work to raised planters, and at various open
spaces around the BID area, such as McCaigs Tower, Corran
Parks, Pulpit Hill and Ganavan.
Maintenance of 42 public benches is also carried out by this
unit.
Design and implementation of bedding schemes
Weed spraying, litter control, leaf clearance.
Grass cutting frequencies are site specific ranging from weekly
(on sports pitches) to eight weekly on lower profile sites.
Floral bedding displays are overhauled and replaced twice per
year, including those in mobile planters, of which there are
some 23 around the town.
Operational Times Core 8am – 4pm Monday – Friday.  Additional hours as
required for special events.
Staffing and Equipment
Levels
1 gardener, 1 horticultural mechanic, 1 grounds maintenance
staff 
General horticultural hand tools, spraying equipment and
lawnmowers
Specialist sports turf maintenance equipment is held at
Mossfield for use on sports pitches throughout the area.
There are no operational cemeteries within the BID  area
Full time equivalent staff allocated to BID area = 3
Key Performance
Indicators
Adherence to grass cutting frequencies.  Quality inspections
carried out by supervisory staff and rectification action taken
where necessary.
Legislation/Policy  In line with health and Safety at work procedures
Existing Value of
Contract/Service
£215,000 
Boundary Area All activity within BID area
Non-compliance
Procedure
N/A 
Additional Information or
Notes
Cost shown is revenue recharge rate. 
Capital expenditure in the BID area is determined in
accordance with the council’s service asset management plan
and will vary from year to year, being additional to the revenue
figure if such works are scheduled. 
Service Area: - 
Activity Area  Economic Development
Statutory/Non-statutory
Service
Non Statutory
Page 451

Page 442

Description/Specification The council carries out a range of economic development
activities ranging from Business Gateway, the promotion of
economic growth including tourism and food and drink
industries, improving skills for work and the development of
area regeneration activities such as the Lorn Arc and public
realm works such as Gibraltar Street and Place making
activities. The service also seeks to promote Argyll, including
Oban as a place to do business, invest in, learn, to live in and
visit.  Much of this activity is considered non statutory and is
dependent on securing external funding to undertake capital
funding to provide
Contact Fergus Murray Head of Service Development and Economic
Growth – 01546 604293
Fergus.murray@argyll-bute.gov.uk 
Existing Activity Gibralter Street public realm project, additional place making
activity including shopfront grants, signage, staycation facilities,
environmental improvements. Assistance with the running of
events and marketing and promotional activity for the town.  The
taking forward of Oban as A University town in partnership with
HIE, UHI and Argyll College. The expansion of the European
Marine Science Park in partnership with HIE, the development
of the Dunbeg Corridor and development of the Airport
Business Park. 
Operational Times Core 9am – 5pm Monday – Friday.  Additional hours as
required for special events 
Staffing and Equipment
Levels
1 Business Gateway Officer covers Oban and Lorn; Other
staff as appropriate.
Key Performance
Indicators
Number of jobs created and businesses supported; Rise in
GVA of main industries including tourism, marine sciences
and food and drink.
Legislation/Policy  N/A
Existing Value of
Contract/Service
N/A 
Boundary Area All activity within BID area 
Non-compliance
Procedure
Subject to regular internal audit 
Additional Information or
Notes
Capital expenditure in the BID area is determined in
accordance with the council’s service asset management plan
and the availability of external funding which will vary from
year to year. 
Page 452

Page 443

Service Area: - 
Activity Area  Strategic Transportation
Statutory/Non-statutory
Service
Non Statutory
Description/Specification The council carries out a range of transport activities in the
Oban and Lorn area including subsidising bus transport
services, improving active travel routes and improving the
integration to transport services within Oban Town Centre.
The council also owns and manages Oban Airport that
operates flights to a number of Argyll Islands including Coll,
Tiree, Colonsay and Islay.
Contact Fergus Murray Head of Service Development and Economic
Growth Transportation – 01546604293
Fergus.murray@argyll-bute.gov.uk 
Existing Activity Completion of active travel routes, examining the use of green
hydrogen, bus priority corridors and improvements to
pavements. 
Operational Times N/A 
Staffing and Equipment
Levels
1 Business Gateway Officer covers Oban and Lorn; Other
economic development staff and strategic transportation staff
as appropriate. 
Key Performance
Indicators
Number of jobs created and businesses supported; Rise in GVA
of main industries including tourism, marine sciences and food
and drink. Number of passengers using Oban Airport. Number
of passengers and vehicles using council Cal Mac services
operating from Oban Harbour. 
Legislation/Policy  Scottish Government/Transport Scotland
Existing Value of
Contract/Service
N/A 
Boundary Area All activity within or adjacent to BID area 
Non-compliance
Procedure
Audited and regulated by Civil Aviation Authority
Additional Information or
Notes
Capital expenditure in the BID area is determined in
accordance with the council’s service asset management plan
and the availability of external funding which will vary from
year to year.
Page 453

Page 444

Service Area: - 
Activity Area  Planning, Housing and Regulatory Services
Statutory/Non-statutory
Service
Statutory
Description/Specification The council carries out a range services that are designed to
facilitate the delivery of development through the granting of
planning consent, building warrants and the regulation of
business activities through its regulatory services teams, in
addition to a range of public health protection activities
(communicable disease, local air quality, monitoring of drinking
water supplies etc.)
Contact Fergus Murray Head of Service Development and Economic
Growth – 01546604293
Fergus.murray@argyll-bute.gov.uk 
Existing Activity Development Management: Handling and determination of
planning and listed building applications, processing of pre
application planning enquiries, and planning enforcement. 
Building Standards: Vetting of building warrants and
assessment of works for completion certificates, responding to
dangerous buildings and recharging costs associated with this
work. 
The regulatory services teams are responsible for 
• Programmed food hygiene and health and safety
interventions and revisits;
• Approval of food businesses;
• Environmental, food monitoring; 
• Investigation of communicable diseases, food
poisoning, and Infectious disease outbreak control;
• Public health and health protection activities;
• Provision of food and export certificates;
• Regulation of private water supplies;
• Health and Safety at work enforcement 
• Registration of private landlords and regulating
standards in houses in multiple occupation and caravan
sites;
• Provision of animal health and welfare regulation;
• Monitoring of air quality;
• Liquor licensing standards compliance and compliance. 
Page 454

Page 445

Operational Times Core 9am – 5pm Monday – Friday. 
Staffing and Equipment
Levels
Development Management: 
6 Staff Members based in Oban – Principal contact: 
Tim Williams, Area Team Leader DM – OLI – 01631 567820 
Housing Services:
1 Research and Development Officer, 1 Area Housing Officer,
1 Housing Advice Assistant, 1 Empty Homes Officer, 1
Housing Improvement Assistant – Development, Housing
Research Assistant
Key Contact Allan Brandie 01369 708679 
Building Standards:
4 professional team members based in Oban – Principal
contact:
Hugh Houston, Team Leader 01631 567958 
Regulatory Services
12 staff, including administration based in Oban
Iain Mackinnon, EH Manager (West): 01631567922
Key Performance
Indicators
Development Management KPIs:
1. DEG110_03 – The time it takes to determine ‘local’
planning applications is no longer than 10% above the
National Average – Target 11 weeks
2.  PR23_06 Achieve and above National Average level of
application approval rates – Target 95% 
Building Standards KPIs
1. Percentage of requests for a building warrants
responded within 20 days - Target 80%
2. Average time to respond to a request for completion
certificate – Target 3 days
3. Percentage of building warrants determined within six
working days - Target 90%
4. Percentage of completion certificates issued/accepted
or determined within three working days – Target 80%
5. Percentage of applicants providing feedback who were
either satisfied or very satisfied with our service  - Target
90% 
Regulatory Services key PIs
1. PR01_01-Protecting health through the delivery of the
formally approved JHPP  - Target 90%
2. PR12_02-Respond to public health incidents which
have an impact on public health within 20 working days-
Target 85%
3. Undertake an enforcement intervention programme to
high risk premises in respect of environmental health,
Page 455

Page 446

animal health and welfare and licensing standards –
Target 95%
4. An enforcement intervention is performed in a
consistent and fair manner with businesses supported
throughout – Target 80% 
Legislation/Policy  Regulatory Services enforce in excess statutes including the
Councils’ statutory duties as a food authority under the Food
Safety Act 1990, an enforcing authority under the Health and
safety at Work etc. Act 1974, as a competent authority under
the Public Health (Scotland) Act 2008 and the Animal Health
(Scotland) Act 1984.
Building Standards enforce the Building (Scotland) Act 2003
and associated regulations.
Town and Country Planning (Scotland) Act 1997, Planning
(Scotland) Act 2019
Existing Value of
Contract/Service
N/A 
Boundary Area All activity within or adjacent to BID area 
Non-compliance
Procedure
The enforcement of a breach of planning control will be
investigated and progressed in the manner set out in the
Council’s Planning Enforcement & Monitoring Charter (March
2022).
Additional Information or
Notes
N/A 
Page 456

Page 447

BID4OBAN LTD, 43 Stevenson Street, Oban, Argyll PA34 5NA. 
Tel. 01631 569915. www.bid4oban.co.uk. Email: andrew.spence@bid4oban.co.uk
Chief Executive - Andrew Spence, Chairman – Antony Cave   Company no. SC435469   VAT NO: 152327236 
Pippa Milne
Chief Executive
Argyll and Bute Council
Kilmory
Lochgilphead
PA31 8RT 
15th June 2022 
Dear Pippa 
Board Agreement
BID4Oban Ltd        
I confirm, as a member of the BID4Oban Ltd BID Board agree, that the decisions on the following elements
of the BID Proposals were taken with my full knowledge and support: -
Agreement was made at the Board Meeting of BID4Oban Ltd on 14th June 2022
• The BID Area
• The BID Levy
• Exemptions to paying the BID Levy
• BID Levy Caps and Thresholds
• Content of the BID Proposals
• Content of the Business Plan (To be submitted) 
Name     Signature              Date
Tony Cave           14/6/2022
John Forbes           14/6/2022 
Fergus Murray           14/6/2022
Ian Clunie           14/6/2022
Gregor MacKinnon          14/6/2022 
Yours sincerely, 
Andrew Spence
Chief Executive 
CC:
Karl Blomer – Scottish Government
Phil Prentice – Chief Executive Scotlands Towns Partnership 
Bill Harvey -Scotlands Towns Partnership 
Page 457

Page 448

BID4OBAN LTD, 43 Stevenson Street, Oban, Argyll PA34 5NA. 
Tel. 01631 569915. www.bid4oban.co.uk. Email: andrew.spence@bid4oban.co.uk
Chief Executive - Andrew Spence, Chairman – Antony Cave   Company no. SC435469   VAT NO: 152327236 
Page 458

Page 449

Appendix 7.1
Tony IAnson
From: antonycave@aol.com
Sent: 12 September 2022 11:34
To: andrew.spence@bid4oban.co.uk; clunieian@gmail.com; Fergus.Murray@argyll-bute.gov.uk; 
jim.lynch@argyll-bute.gov.uk; johng.forbes@btinternet.com
Cc: Tony IAnson; kay@bid4oban.co.uk
Subject: Re: Agreement to hold a ballot
Andy 
Just to confirm that I am in agreement to hold the ballot. 
Regards 
Antony Cave 
-----Original Message----- 
From: andrew.spence@bid4oban.co.uk 
To: 'Murray, Fergus' <F>; Craigard Decor <antonycave@aol.com>; 'John Forbes' <>; 'Ian Clunie' 
<clunieian@gmail.com>; Lynch, Jim <> 
CC: Tony IAnson <tony@stirling.co.uk>; kay@bid4oban.co.uk 
Sent: Mon, 12 Sep 2022 9:35 
Subject: Agreement to hold a ballot 
Good morning 
Please see the attached document regarding BID4Oban Directors agreement to hold a ballot. It is of
the utmost importance that you reply to this email TODAY copying in ALL people in this email with
your agreement. Feel free to scan and sign or confirm via email. Either way we need a reply. 
Kindest regards 
Andy 
Andrew Spence
Chief Executive
BID4Oban Ltd
Company No. 435469
Tel: 01631 569915
Mob: 0782 5013304
www.bid4oban.co.uk
www.oban.org.uk
Page 459

Page 450

This page is intentionally left blank

Page 451

Appendix 7.2
Tony IAnson
From: Lynch, Jim <Jim.Lynch@argyll-bute.gov.uk>
Sent: 12 September 2022 11:17
To: andrew.spence@bid4oban.co.uk
Cc: Murray, Fergus; Craigard Decor; John Forbes; Ian Clunie; Tony IAnson; kay@bid4oban.co.uk
Subject: Re: Agreement to hold a ballot
Attachments: APP 7 Board Agreement to.pdf
Andy,  
Yes I agree.
Regards
Jim Lynch   
SNP Councillor
Ward 4 Oban South and the Isles
On 12 Sep 2022, at 09:36, andrew.spence@bid4oban.co.uk wrote:
Good morning   
Please see the attached document regarding BID4Oban Directors agreement to hold a ballot. It is of
the utmost importance that you reply to this email TODAY copying in ALL people in this email with
your agreement. Feel free to scan and sign or confirm via email. Either way we need a reply.
Kindest regards
Andy
Andrew Spence
Chief Executive
BID4Oban Ltd
Company No. 435469
Tel: 01631 569915
Mob: 0782 5013304
www.bid4oban.co.uk
www.oban.org.uk  
Page 461

Page 452

This page is intentionally left blank

Page 453

Appendix 7.3
Tony IAnson
From: ian clunie <clunieian@gmail.com>
Sent: 12 September 2022 10:19
To: andrew.spence@bid4oban.co.uk; Craigard Decor; John Forbes; Lynch, Jim; Murray, Fergus
Cc: Tony IAnson; kay@bid4oban.co.uk
Subject: RE: Agreement to hold a ballot [OFFICIAL]
Good morning,
I confirm I’m in agreement
Kind regards  
Ian  
On Sep 12, 2022, 09:58 +0100, Murray, Fergus <Fergus.Murray@argyll‐bute.gov.uk>, wrote:
Classification: OFFICIAL
I agree.  Regards Fergus
From: andrew.spence@bid4oban.co.uk <andrew.spence@bid4oban.co.uk>
Sent: 12 September 2022 09:36
To: Murray, Fergus <Fergus.Murray@argyll‐bute.gov.uk>; Craigard Decor <antonycave@aol.com>;
'John Forbes'
<johng.forbes@btinternet.com>; 'Ian Clunie' <clunieian@gmail.com>; Lynch, Jim <Jim.Lynch@argyll‐
bute.gov.uk>
Cc: Tony IAnson <tony@stirling.co.uk>; kay@bid4oban.co.uk
Subject: Agreement to hold a ballot
Importance: High   
Good morning
Please see the attached document regarding BID4Oban Directors agreement to hold a ballot. It is of
the utmost importance that you reply to this email TODAY copying in ALL people in this email with
your agreement. Feel free to scan and sign or confirm via email. Either way we need a reply.
Kindest regards
Andy
Andrew Spence
Chief Executive
BID4Oban Ltd
Page 463

Page 454

Appendix 7.3
Company No. 435469
Tel: 01631 569915
Mob: 0782 5013304
www.bid4oban.co.uk
www.oban.org.uk     
Page 464

Page 455

Appendix 7.4
Tony IAnson
From: Murray, Fergus <Fergus.Murray@argyll-bute.gov.uk>
Sent: 12 September 2022 09:58
To: andrew.spence@bid4oban.co.uk; Craigard Decor; 'John Forbes'; 'Ian Clunie'; Lynch, Jim
Cc: Tony IAnson; kay@bid4oban.co.uk
Subject: RE: Agreement to hold a ballot [OFFICIAL]
Classification: OFFICIAL
I agree.  Regards Fergus
From: andrew.spence@bid4oban.co.uk <andrew.spence@bid4oban.co.uk>  
Sent: 12 September 2022 09:36
To: Murray, Fergus <Fergus.Murray@argyll‐bute.gov.uk>; Craigard Decor <antonycave@aol.com>;
'John Forbes'<johng.forbes@btinternet.com>; 'Ian Clunie' <clunieian@gmail.com>; Lynch, Jim
<Jim.Lynch@argyll‐bute.gov.uk>
Cc: Tony IAnson <tony@stirling.co.uk>; kay@bid4oban.co.uk
Subject: Agreement to hold a ballot
Importance: High
Good morning
Please see the attached document regarding BID4Oban Directors agreement to hold a ballot. It is of
the utmost importance that you reply to this email TODAY copying in ALL people in this email with
your agreement. Feel free to scan and sign or confirm via email. Either way we need a reply.
Kindest regards
Andy
Andrew Spence
Chief Executive
BID4Oban Ltd
Company No. 435469
Tel: 01631 569915
Mob: 0782 5013304
www.bid4oban.co.uk
www.oban.org.uk
Page 465

Page 456

This page is intentionally left blank

Page 457

BID4OBAN LTD, 43 Stevenson Street, Oban, Argyll PA34 5NA. 
Tel. 01631 569915. www.bid4oban.co.uk. Email: andrew.spence@bid4oban.co.uk
Chief Executive - Andrew Spence, Chairman – Antony Cave   Company no. SC435469   VAT NO: 152327236 
Pippa Milne
Chief Executive
Argyll and Bute Council
Kilmory
Lochgilphead
PA31 8RT 
15th June 2022 
Dear Pippa 
Planning etc. (Scotland) Act 2006
Business Improvement Districts (Scotland) Regulations 2007 
BID4Oban Ltd Business Improvement District – Cost of Renewal Ballot
I refer to the above-mentioned subject and to my letters dated 3/5/2022 and 14/6/2022 in which I formally
notified you of our intention to request Argyll and Bute Council put the BID4Oban Business Improvement
District Proposals to a renewal ballot. 
I can confirm the BID4Oban has set aside sufficient funds to meet the cost of the ballot.
I would be grateful if you would kindly acknowledge receipt of this letter. 
Yours sincerely, 
Andrew Spence
Chief Executive 
CC:
Karl Blomer – Scottish Government
Phil Prentice – Chief Executive Scotlands Towns Partnership 
Bill Harvey -Scotlands Towns Partnership 
Page 467

Page 458

This page is intentionally left blank

Page 459

Document is Restricted
Page 469 Agenda Item 21dNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 460

This page is intentionally left blank

Page 461

Operating Agreement 
October 2017
between 
Argyll and Bute Council 
and 
BID 4 Oban Limited 
Page 471 Agenda Item 21e

Page 462

Index 
1. Definitions          3
2. Statutory Authorities         6
3. Commencement         6
4. Obligations of the Council        7
5. Baseline Services and Complimentary Services     7
6. The BID Revenue Account        7
7. Debits from the BID Revenue Account      8
8. Collection and Remittance of the BID Levy      8
9. Procedures available to the Council for enforcing payment of the BID Levy 10
10. Enforcement Mechanisms for non-collection of the BID Levy by the Council 10
11. Accounting Procedures and Monitoring      11
12. Termination          12
13. Confidentiality          14
14. Notices          14
15. Exercise of the Council’s Powers       15
16. Arbitration          15
17. Best Endeavours         15
18. Governing Law         17 
Schedule 
1. The BID Levy Rules         16
2 The Baseline Services        20
3. The Complimentary Services        
4. Breakdown of Council’s Annual BID Levy collection and administration charge 32
5. Map of the BID Area         33 
Page 472

Page 463

Operating Agreement 
Between: 
1. Argyll and Bute Council  (the “Council”) a local authority consisted by the Local
Government (Scotland) Act 1994 having its principal place of business at Kilmory,
Lochgiliphead, Argyll; and
2. BID 4 Oban Limited (the “BID Company”) incorporated as a company limited by
guarantee in Scotland with company number SC 435469 and having its registered
office at 15 Lochside Street, Oban, PA34 4HP. 
Recitals 
(A) The Council and the BID Company are in favour of establishing the BID (as
hereinafter defined) and the Council has confirmed that it will not exercise its veto in
connection with the BID or the BID Arrangements (as hereinafter defined).
(B) The Council (or its nominee) is the billing body for the purposes of the BID
Legislation and is responsible for the administration, collection and recovery of the
BID Levy (as hereinafter defined).
(C) The Council is responsible for administering the BID Revenue Account (as
hereinafter defined) which shall be used towards the operation and funding of the
BID Arrangements of the BID in the BID Area (as hereinafter defined).
(D) The BID Company is responsible for the management, administration and operation
of the BID and for using the BID Levy for the purposes of achieving the objectives
and aspirations set out in the BID Arrangements (as hereinafter defined and in the
BID Company Business Plan).
(E) Both parties wish to confirm the arrangements by which the BID Levy shall be
collected together with general arrangements as to the relationship to be
established between the Council and the BID Company for the duration of the BID 
(F) The purpose of this Agreement is to:  
1. establish the procedure for the setting, collection and remittance of the BID
Levy (see Part 4  of the Schedule to this Agreement); 
2. confirm the basis upon which the Council will be responsible for collecting the
BID Levy (see Part 1 of the Schedule to this Agreement); 
3. set out the enforcement mechanisms available to the Council for collection of
the BID Levy; 
4. set out the procedures for accounting and transference of the BID Levy; 
5. provide for the monitoring and review of the collection of the BID Levy; 
6. confirm the manner in which the Council’s expenses incurred (if any) in
collecting the BID Levy shall be paid; and 
7. confirm the basis on which the BID Arrangements are to be delivered by the
BID Company on behalf of the Council. 
Page 473

Page 464

It is hereby agreed as follows: 
1 Definitions 
1.1 “Annual Report“ means a report to be prepared by the Council which details the
following:-
1. the total amount of BID Levy collected during the relevant Financial Year;
2. the total amount of interest earned on any part of the BID Levy whilst held in
the BID Revenue Account;
3. details of the success rate for the collection of the BID Levy;
4. the Council’s proposals (if any) to help improve its efficiency in the collection
and enforcement of the BID Levy;
5. details of those BID Levy Payers who have paid the BID Levy and those who
have not paid the BID Levy; and
6. the Council’s proposals for bad or doubtful debts; 
“Appeal Notice” means a notice to be served by the BID Company in accordance
with Clause 10.2;
“Bad or Doubtful Debts” shall have the same meaning as further described in
Part 2 of schedule 3 of the Regulations;
“Ballot Holder” means the person appointed by the Council under regulation 7 of
the Regulations;
“Ballot Result Date” means the date (not later than seven days from the counting
of the ballot papers) upon which a successful ballot result has been declared by
the Ballot Holder in favour of putting in place the BID Arrangements;
“Baseline Services” means those services which are provided by the Council
within the BID Area which the Council is required to provide as part of its statutory
function as a local authority as set out at Part 3 of the schedule;
“BID” means the Business Improvement District which operates within the BID
Area and which is managed and operated by the BID Company;
“BID Area” means the precise geographical area which is to be managed and
operated by the BID Company and as detailed in the BID Proposal, shown in the
map at Part 5 of the Schedule;
“BID Arrangements” means those arrangements to be put in place pursuant to the
Regulations for the operation of the BID;
“BID Ballot” means a ballot under section 38(1) of the Planning etc. (Scotland) Act
2006;
“BID Company’s Report” means a report for each Financial Year to be prepared
by the BID Company which details the following:-
Page 474

Page 465

1. the total income and expenditure of the BID Levy; 
2. other income and expenditure of the BID Company not being the BID Levy;
3. a statement of actual and pending deficits; and
4. the various projects and services upon which the BID Levy has been
expended by the BID Company;
“BID Levy” means the charge to be levied and collected within the BID area
pursuant to the Regulations;
“BID Company’s Termination Notice” means a notice to be served by the BID
Company on the Council pursuant to Clause 12.9;
“BID Legislation“ means Planning etc (Scotland) Act 2006 and associated
Regulations as defined in the Business Improvement Districts (Scotland)
Regulations 2007;
“BID Levy Payer(s)” means those liable to pay non-domestic rates in the BID or
responsible for paying the BID Levy;
“BID Levy Basis and Rules” means the rules set out at Part 1 of the Schedule
which sets out how the BID Levy will be calculated, details of Exempt or
Discounted Properties and other requirements related to the BID Levy (as may be
amended by a successful alteration ballot);
“BID Revenue Account” means the account (within the Council’s general ledger)
to be set up in accordance with paragraph 16 of the Regulations and operated in
accordance with schedule 3 of the Regulations;
“BID Term” means the period not exceeding 5 years from 31 October 2017 or the
date on which the BID Arrangements (the Operational Date of the BID Co) come
into force. 
“Chargeable Period” means the 12 month period commencing from the start of
the BID Term, and on the anniversary of the start of the BID Term for the following
4 years;
“Complimentary Services” means those services which are provided by the
Council within the BID Area which are additional services to the Baseline Services,
as set out at Part 3 of the Schedule;
“Council Funding” means any funding, grants or monies due to be provided by
the Council to the BID Company for the purposes of operating the BID;
“Council’s Termination Notice” means the notice to be served by the Council on
the BID Company pursuant to Clause 12.2;
“Contributors” means the BID Levy Payers or other contributors making voluntary
contributions to the BID Company;
“Demand Notice” shall have the same meaning ascribed to it as further set out in
the schedule to the Order;
Page 475

Page 466

“Electronic Communication” means a communication transmitted (whether from
one person to another, from one device to another or from a person to a device or
vice versa):
1. by means of a telecommunication system (within the meaning of the
Telecommunications Act 1984); or
2. by other means but while in electronic form;
“Enforcement Expenses” means the costs which are reasonably and properly
incurred by the Council in issuing a Reminder Notice, obtaining a Summary
Warrant and associated administrative expenses which may be incurred in
recovering unpaid BID Levy; 
“Enforcement Notice” means a notice to be served on the Council as specified in
Clause 10;
“Exempt or Discounted Properties” means the class or classes of properties as
identified in the BID Levy Rules which shall either be exempt from any requirement
to pay the BID Levy or are permitted a discount on the BID Levy;
“External Funding” means any funding, grants or monies due to be provided to
the BID Company by the Scottish Government, the European Commission or any
other body other than the Council for the purposes of operating the BID;
“Failure Notice” means a notice served by the BID Company on the Council which
sets out those aspects of the agreed Statutory or Prevailing Standard which are not
being adhered to, requesting that the Council secures immediate compliance with
the Statutory or Prevailing Standard;
“Financial Year” means the financial year for the BID Company which runs from 1
April to 31 March;
“Monitoring Group” means the group to be set up to monitor the collection and
enforcement of the BID Levy (as referred to in Clause 11); 
“Operational Date” means the date upon which the BID Arrangements come into
force;
“Order” means The Planning etc. (Scotland) Act 2006 (Business Improvement
Districts Levy) Order 2007;
“Public Meeting” means the meeting to be held of all BID Levy Payers pursuant to
the Public Meeting Notice;
“Public Meeting Notice” means a notice to be served pursuant to Clause 12.2 or
12.9 by either the Council or the BID Company which provides the following:
1. confirmation that either party is considering terminating the BID;
2. details of the venue where the public meeting will be held; and
3. confirmation that all BID Levy Payers who attend will be permitted to make
representations;
Page 476

Page 467

“Regulations” means the Business Improvement Districts (Scotland) Regulations
2007 and such amendments made by The Scottish Ministers pursuant to Part 9 of
the Planning etc. (Scotland) Act 2006 (as may be in force from time to time);
“Reminder Notice” means the notice to be served pursuant to Clause 9.1;
“Schedule“ means the Schedule annexed and executed as relative hereto; 
“Services” means the administration and management of the BID Revenue
Account; and
“Statutory or Prevailing Standard” means the standard as it may be from time to
time to which the Council should be providing the Baseline Services and the
Complimentary Services as local authority for the BID Area;
“Summary Warrant” means an order obtained from the Sheriff Court having
jurisdiction over the BID Area in accordance with the provisions of paragraph 9 of
the schedule to the Order.
1.2    For the avoidance of doubt where any part of this Agreement is incompatible with
the Regulations or any other regulations which The Scottish Ministers may from
time to time issue pursuant to Part 9 of the Planning etc. (Scotland) Act 2006 then
such part shall be struck out and the balance of this Agreement shall remain.
1.3 The headings appearing in this Agreement are for ease of reference only and shall
not affect the construction of this Agreement.
1.4 Where reference is made to a Clause, Part, or Recital such reference (unless the
context requires otherwise) is a reference to a Clause, part, plan, or recital
attached to this Agreement.
1.5 References to the Council include any successors to its functions as local
authority. 
1.6 References to statutes, bye laws, regulations, orders or delegated legislation shall
include any such instrument re-enacting or made pursuant to the same power.
2  Statutory Authorities 
This Agreement is made in contemplation of the arrangements envisaged by Part 9
of the Planning etc. (Scotland) Act 2006, the Regulations and all other enabling
powers. 
3 Commencement 
3.1 This Agreement is conditional upon the Council approving the proposals and
business plan of the BID Company and written confirmation being provided by the
Council to the BID Company of that approval and shall not take effect until the Ballot
Result Date.
3.2 In the period prior to the Ballot Result Date, the Council will procure that the Ballot
Holder provides the BID Company with all information as the BID Company may
reasonably request in relation to the BID Ballot.
Page 477

Page 468

3.3 In the event that the BID Arrangements are not voted in favour by the BID Levy
Payers on the Ballot Result Date then this Agreement shall terminate and cease to
be of any further effect between the parties.
3.4 This Agreement will continue in full force and effect in the event of the BID Levy
Payers voting in favour of the BID Arrangements.
3.5 If, at the end of the BID Term a renewal ballot is held and is successful then the
terms of this Agreement shall continue to be of effect for a new BID Term. 
4 Obligations of the Council 
4.1 Immediately upon the declaration by the Ballot Holder on the Ballot Result Date the
Council shall:-
4.1.1 calculate the BID Levy due from each BID Levy Payer in accordance with the
BID Levy Rules;
4.1.2 confirm in writing to the BID Company the BID Levy payable annually or in 10
instalments per year by each BID Levy Payer;
4.1.3 provide the Baseline Services, which may not be varied in any way or
withdrawn without reasonable cause and only with the consent of the BID
Company;
4.1.4 provide the Complimentary Services, which may not be varied or withdrawn
without first consulting with the BID Company; and
4.1.5 perform all obligations placed upon it under this Agreement and in
accordance with the Regulations.
5. Baseline Services and Complimentary Services 
5.1 The Council shall provide the Baseline Services and Complimentary Services
within the BID Area at its own cost and to the Statutory or Prevailing
Standard.  
5.2 In the event that any of the Statutory Baseline Services falls below the
Statutory Standard, the BID Company shall be entitled to serve a Failure
Notice on the Council.
5.3  Upon receipt of a Failure Notice, the Council shall ensure that the relevant
Statutory Baseline Services are brought back to the Statutory Standard.
5.4 The Statutory Standard may be reviewed from time to time by the Council and
the BID Company, in consultation with each other.  In the event that the
Council and the BID Company cannot agree on the standard to be set, they
shall refer the matter to Arbitration under Clause 16. 
6. The BID Revenue Account 
6.1 The Council must in accordance with section 37(1) of the Planning etc.
(Scotland) Act 2006 keep an account to be called the BID Revenue Account
Page 478

Page 469

and keep the BID Revenue Account in accordance with schedule 3 of the
Regulations.
6.2 Within 10 days from the Ballot Result Date the Council shall set up a BID
Revenue Account within its general ledger and provide written confirmation to
the BID Company once this has been carried out.
6.3 Within 10 days from the Ballot Result Date the BID Company shall provide
the Council with details of its own bank account into which the BID Levy shall
be transferred electronically from the BID Revenue Account on production of
an invoice by the BID Company in accordance with Clause 8.9.
6.4 Where the BID Company receives Council Funding and / or External Funding,
the full sum of that Council Funding and / or External Funding (as
appropriate) shall be credited directly to the BID Revenue Account with no
sums deducted by the Council in accordance with Clause 7 below.
6.5 Any commitment by the Council to provide Council Funding to the BID
Company for any period exceeding the term of the Council as presently
constituted up to the BID Term shall bind any succeeding Council to continue
to provide the Council Funding.
7. Debits from the BID Revenue Account 
7.1 The Council undertakes at all times to adhere to the provisions of Part 2 of
schedule 3 of the Regulations.
7.2 The Council’s charge for the provision of the Services on an annual basis will
be £6500 (excluding VAT) (the “Council Annual Charge”) representing its
reasonable administrative costs in providing the Services (to be identified and
agreed between the Council and the BID Company) yearly and having effect
on the 31 October of each year for which a BID is in place. Charges will be
increased annually by CPI based on the increase over the last 12 months
from the base in July 2017.  The first increase will apply on 31 October 2018,
and annually thereafter. Following receipt by the BID Company of a valid VAT
invoice, the first payment will be due together with VAT within 4 weeks of
receipt, or later by agreement. 
7.3 A breakdown of the Council Annual Charge is annexed at Part 4 of the
Schedule.
7.4 The Council shall not debit any sums from the BID Revenue Account without
first notifying the BID Company of its intention to do so.
7.5. The Council shall be obliged to recover the Enforcement Expenses from the
liable BID Levy Payer, in accordance with Clause 9.
7.6 The Council shall not be entitled to recover Enforcement Expenses from the
BID Company.   
7.7 The Council shall not write off Bad or Doubtful Debts without the BID
Company’s prior consent. 
8. Collection and Remittance of the BID Levy 
Page 479

Page 470

8.1 The BID Levy will be paid into the BID Revenue Account in accordance with
schedule 3 of the Regulations.
8.2 Within 14 (fourteen) days of the Ballot Result Date the Council shall confirm in
writing to the BID Company:-
8.2.1 the means by which the BID Levy Payer shall be billed for the BID
Levy; and 
8.2.2 the date when the BID Levy shall first be collected 
8.3 Pursuant to Clause 8.1.2 the Council shall serve the Demand Notices on
each BID Levy Payer and thereafter shall continue to calculate the BID Levy
and serve the Demand Notices throughout the BID Term.
8.4 The Council shall maintain a list which identifies payment and/or non payment
of the BID Levy and shall make this available to the BID Company upon its
reasonable request which shall at all times be carried out in accordance with
the relevant Data Protection legislation.
8.5 The Council shall liaise with the BID Company in carrying out monthly reviews
of each property within the BID Area and in the event of any change in the
occupier of each property or the merger or division of a property (or provision
of an additional property) shall:
8.5.1 serve an updated list of BID Levy Payers upon the BID Company; and
8.5.2 serve a Demand Notice (or alter any existing Demand Notice if
appropriate) on the relevant BID Levy Payer.
8.6 The Council shall use all reasonable endeavours to collect the BID Levy on
the date specified (pursuant to Clause 8.1.2 above) and thereafter on an
annual basis and in accordance with the Order.
8.7 The Council shall use all reasonable endeavours to take all reasonable steps
for collecting the BID Levy which are consistent with its usual procedures for
the collection of non-domestic rates.  In the event that the Council departs
from its usual procedures and decides not to collect an amount of BID Levy,
the Council shall consult with the BID Company as to whether or not that
amount of BID Levy is recoverable.  If the Council and the BID Company fail
to reach an agreement, then the BID Company may serve an Enforcement
Notice upon the Council under Clause 10 of this Agreement failing which the
parties shall refer the matter to Arbitration in accordance with Clause 16 of
this Agreement.
8.8 The Council shall inform the BID Company of the amount of BID levy monies
collected every month.
8.9 The BID Levy, as collected by the Council, is within the control of the Council
and is ring fenced for the specific purposes of the BID.
8.9.1 The BID Company is the sub contractor engaged by the Council to
deliver the BID objectives.
Page 480

Page 471

8.9.2 The BID Company is making taxable supplies to the Council, and in
the normal way must charge VAT to the Council.
8.9.3 This VAT will be charged via an invoice that the BID Company will
issue to the Council for payment of the BID Levy income (i.e. BID Levy
Income plus VAT).
8.9.4 The Council can recover the VAT, subject to the normal rules.
8.9.5 The BID Company can then recover any VAT that it incurs in
delivering the BID projects and services subject to the normal rules.
8.9.6 The BID Company shall raise an invoice, plus VAT to the Council
every month or less frequently should the BID Company and Council
so decide.  This invoice shall be based on the information outlined in
Clause 8.8, for the total amount of BID Levy monies collected, minus
the total of BID Levy monies previously invoiced for in the relevant
Financial Year and upon receipt of such invoice or invoices, the
Council will be obliged to transmit such monies as are due to the BID
Company in terms of the invoices, to the BID Company from the BID
Revenue Account within a maximum period of 30 (thirty) days.
Notes
The majority if not all of the income received by the BID Company from the Council will be
taxable. But there may be certain circumstances where exempt supplies are made. Where
such supplies are made any VAT incurred by the BID Company will be irrecoverable. 
9 Procedures available to the Council for enforcing payment of the BID Levy 
9.1 In the event that the BID Levy is not paid within 28 (twenty eight) days from the date
that it becomes payable then the Council shall serve a Reminder Notice on such
relevant BID Levy Payer which shall:-
9.1.1 identify the sum payable;
9.1.2 provide a further 7 (seven) days for payment to be made; and
9.1.3 confirm that the Council will make an application for a Summary Warrant to
recover the unpaid sum.
9.2 If after a further 7 (seven) days from the payment date stated in the Reminder Notice
the outstanding sum of the BID Levy has not been paid, the Council shall make an
application for a Summary Warrant to recover the outstanding sum of the BID Levy.
10 Enforcement Mechanisms for non-collection of the BID Levy by the Council 
10.1 In the event that the Council is not enforcing payment of the BID Levy pursuant to
Clause 9 above the BID Company shall serve the Enforcement Notice on the Council
requesting that:-
10.1.1 the Council serves a Reminder Notice; or
10.1.2 the Council obtains a Summary Warrant pursuant to Clause 9.2 above;
Page 481

Page 472

within 14 (fourteen) days of receipt of such Enforcement Notice and the Council shall
thereafter provide written confirmation of the action taken to the recover the unpaid
BID Levy.
10.2 If after being served an Enforcement Notice the Council fails to take the requested
action within the specified time frame then the BID Company shall serve an Appeal
Notice to the Chief Executive of the Council.  Such notice shall:-
10.2.1 detail the sum which remains unpaid;
10.2.2 confirm that the Council has failed to use the enforcement mechanisms
available to it under this Agreement to recover the sum; and
10.2.3 request a meeting take place between the Chief Executive, relevant officers
of the Council and BID Company to achieve a solution and/or agree a
strategy to recover the outstanding sum, such meeting to take place in any
event no later that 28 (twenty eight) days from service of the Appeal Notice.
10.3 In the event that the Council fails to take any of the steps requested by the BID
Company pursuant to Clauses 10.1 and 10.2 (above) the Council shall (within 28
days of receipt of written notice from the BID Company which specifies the amount of
BID Levy outstanding) pay the specified sum into the BID Revenue Account and
provide written confirmation to the BID Company that this has been done.
11        Accounting Procedures and Monitoring 
11.1 Within 2 months from the Operational Date the Council and BID Company shall form
the Monitoring Group.
11.2 Every  month for the duration of BID Term the Council shall provide the BID
Company with a breakdown of:-
11.2.1 the amount of BID Levy for each individual BID Levy Payer; 
11.2.2 the BID Levy collected in relation to each BID Levy Payer;
11.2.3 details (together with the outstanding unpaid sum) of those BID Levy Payers
who have not paid the BID Levy during those 2 month;
11.2.4 details of the Reminder Notices issued throughout that period; and
11.2.5 details of any Summary Warrants obtained or applied for by the Council. 
11.3 Every 6 months (for the BID Term) the BID Company shall provide the Council with
the following details:
11.3.1 the total amount of income received from the Contributors (excluding the BID
Levy); and
11.3.2 the total expenditure during that 6 month period.
11.4 The Monitoring Group shall meet not less than  twice in any one Financial Year and
on all other occasions further meetings of the Monitoring Group shall be arranged by
the service of written notice by either party on the other, such notice to be provided
no less than 28 (twenty eight) days prior to the date of the proposed meeting (or
Page 482

Page 473

lesser if otherwise agreed or in cases of emergency) and provided further that such
meetings can be dispensed with altogether upon the written agreement of both the
Council and the BID Company.
11.5 At each meeting the Monitoring Group shall:
11.5.1 review the effectiveness of the collection and enforcement of the BID Levy;
and
11.5.2 if required, review and assess the information provided by the Council and the
BID Company pursuant to Clauses 11.2 and 11.3 above and make any
recommendations for implementation as may be agreed (and which are
permitted by the Regulations and the terms of this Agreement). 
11.6 Within 1 (one) month from the date of the Annual General Meeting the BID Company
shall provide the BID Company’s Report to the Council.
12        Termination 
12.1 The Council undertakes at all times to adhere to the provisions of paragraph 19 of
the Regulations.
12.2 The Council shall not be permitted to terminate the BID Arrangements because:
12.2.1 in its opinion there are insufficient finances available to the BID Company to
meet its liabilities for the chargeable period for the purposes of the BID
Arrangements; or
12.2.2 the Council is unable, as a result of any circumstances beyond its control, to
provide the works or services which are secured as part of the BID
Arrangements;
unless and until it first serves the Public Meeting Notice on the BID Levy Payers
and the Council’s Termination Notice on the BID Company (which shall be required
to contain the reasons for termination) and within 14 (fourteen) days from the date
of service of such notice both parties shall arrange to meet where the purpose of
such meeting shall be to discuss and/or agree all or any of the following set out in
Clause 12.3 or 12.4 (whichever is applicable). 
12.3 Where the Council’s Termination Notice relates to Clause 12.2.1 both parties shall
agree and/or discuss or review the following matters:
12.3.1 the Council is concerned that the BID Company has insufficient finances to
meet its liabilities for that period and details of such concerns should be made
available to the BID Company;
12.3.2 alternative means by which the insufficiency of the funds can be remedied;
and / or
12.3.3 an appropriate time frame to resolve matters; 
12.4 Where the BID Company’s Termination Notice relates to Clause 12.2.2 both parties
shall agree and/or discuss or review the following matters:
Page 483

Page 474

12.4.1 the services or works which it is no longer able to provide together with
confirmation and details as to why such works or services cannot be
provided;
12.4.2 a review by both parties as to whether such works or services are of material
importance to the BID so that termination of the BID Arrangements is the only
option;
12.4.3 alternative means of procuring the said services or works by third parties or
increased financial funding from the BID Company;
12.4.4 alternative replacement services or works which will be acceptable to the BID
Company; and / or
12.4.5 an appropriate time frame to resolve matters.
12.5 Notwithstanding Clauses 12.1, 12.2, 12.3 and 12.4 above, the Council shall procure
that a Public Meeting is held prior to the termination of the BID Arrangements.
12.6 In the event that the parties cannot reach agreement in relation to any of the matters
referred to in Clauses 12.3 and 12.4 and subject to consideration of representations
made by any BID Levy Payer at the Public Meeting the Council shall be permitted to
terminate the BID Arrangements provided that notice by the Council to terminate the
BID Arrangements shall be provided to the BID Company no less than 28 days prior
to termination taking place.
12.7 Upon termination of the BID Arrangements the Council shall review whether there is
a credit in the BID Revenue Account and in the event that there are sufficient funds in
the BID Revenue Account amounting to a refund of at least £10 for each BID Levy
Payer (having already deducted a reasonable sum for the cost of the administration
of such refund) to:
12.7.1 calculate the amount to be refunded to each BID Levy Payer;
12.7.2 ensure that the amount to be refunded is calculated by reference to the
amount payable by each BID Levy Payer for the last chargeable period; and
12.7.3 make arrangements for the amount calculated to be credited against any
outstanding liabilities of each BID Levy Payer or, where there are no such
liabilities, refunded to the BID Levy Payer.
12.8 Upon termination of the BID Arrangements the Council shall as soon as reasonably
practicable notify the BID Levy Payers of such termination in accordance with
paragraph 19(6) of the Regulations together with confirmation as to whether any part
of the BID Levy is to be repaid to the BID Levy Payers in accordance with Clause
12.7.
12.9 The BID Company shall not be permitted to terminate the BID Arrangements where:
12.9.1 the works or services under the BID Arrangements are no longer required;  
or
12.9.2 the BID Company is unable, as a result of any circumstances beyond its
control to provide works and services which are necessary for the BID
Arrangements to continue;
Page 484

Page 475

unless and until it first serves the Public Meeting Notice on the BID Levy Payers and
the BID Company’s Termination Notice on the Council and thereafter carried out a
proper consultation with all relevant representatives of the BID Area as considered
appropriate by the Council. 
12.10 Upon termination of the BID Arrangements the BID Company shall notify the Council
of such termination in accordance with paragraph 19(5) of the Regulations and the
Council shall notify the BID Levy Payers pursuant to paragraph 19(6) of the
Regulations, together with confirmation as to whether any part of the BID Levy is to
be repaid to the BID Levy Payers in accordance with Clause 12.7.
13 Confidentiality 
Both the Council and the BID Company agree to keep confidential and not to divulge
to any person without the prior written consent of the other party all information
(written or oral) concerning the business affairs of the other nor any information
which has been exchanged about the BID Levy Payers or the Contributors or about
other third parties which it shall have obtained or received as a result of operating the
BID.  This obligation shall survive the termination or lapse of the BID Arrangements. 
14 Notices 
14.1 Any notice or other written communication to be served or given to or upon any party
to this Agreement to the other shall be in writing and shall be sent to the registered
office or principal place of business of the parties or such substitute address in
Scotland as may from time to time have been notified by that party.
14.2 A notice may be served by:
14.2.1 delivery to the Head of Customer and Support Services at the Council’s
principal office at Kintyre House, Snipefield Industrial Estate, Campbeltown
PA28 6SY or such other address as intimated in writing to the BID Company;
14.2.2 delivery to the Company Secretary at the BID Company’s registered office; 
14.2.3 registered or recorded delivery post; or
14.2.4 Electronic Communication (provided that it is in legible form and is capable of
being used for subsequent reference).
14.3 Any notice served shall be deemed to have been validly served or given at the time
when in the ordinary course of business it would have been received.
15  Exercise of the Council’s Powers 
Nothing contained in this Agreement or implied in it shall prejudice or affect the
rights, discretions, powers, duties and obligations of the Council under all statutes,
bye-laws, statutory instruments, orders and regulations in the exercise of its functions
as a local authority. 
16   Arbitration 
16.1 Any dispute or difference between the parties in relation to this Agreement shall be
determined by an independent expert.  
Page 485

Page 476

16.2 Such an independent expert shall be agreed between the parties or in default of
agreement within five days of a request to agree appointed on the application of
either party by the President or other appropriate appointing Officer for the time being
of, the Law Society of Scotland in each case being a person under 60 but of not less
than 10 years standing and with recent relevant experience of the matter in dispute.
16.3 The decision of the independent expert shall be final and binding on the parties and
the costs of the independent expert shall be borne as he may determine or otherwise
shall be borne between the parties in equal shares.
17  Best Endeavours 
The Council and the BID Company each confirm that it is their intention to use their
best endeavours to promote the best interests of the BID and to consult fully on all
matter materially affecting the development of the BID.  The Council and the BID
Company shall act in good faith towards each other in order to promote the success
of the BID.
18  Governing Law 
18.1 This agreement and any disputes or claims arising out of or in connection with its
subject matter are governed by and construed in accordance with the law of
Scotland.
18.2 The parties irrevocably agree that the courts of Scotland have exclusive jurisdiction
to settle any dispute or claim that arises out of or in connection with this agreement. 
In witness whereof these presents on this and preceding 14 pages together with the
Schedule (in five parts) annexed as relative hereto are executed as follows:
Subscribed for and on behalf of Council 
at 
on 
by 
before 
Witness 
Full Name 
Address   
Occupation 
Subscribed for and on behalf of BID 4 Oban
Limited 
at 
on 
by 
before 
Witness
Page 486

Page 477

Full Name 
Address   
Occupation 
Page 487

Page 478

This is the Schedule (in five parts) referred to in the foregoing Operating Agreement
between Argyll and Bute Council and BID4Oban
The Schedule
The BID Levy Basis and Rules
Part 1
Introduction 
Part 1 of the Schedule of the Agreement lays down the BID levy basis and rules for the
proposed Oban BID levy to be applied to all businesses above a set threshold within the
defined footprint of the BID Area.
Rateable Value (Non-Domestic Rates)
The rateable value of all business property within the BID Area is set by the Dunbartonshire
and Argyll & Bute Valuation Joint Board upon which the Council levy their charges to
businesses. 
The non domestic rateable values are re-valued approximately every 5 years.  The last
valuation took place with effect from 1 April 2017.  The next re-valuation is due to take place
with effect from 1 April 2022.   
BID Levy Threshold
The Oban BID levy threshold will be £3,000, whereby all businesses with a rateable value of
£3,000 or greater amount will be required to pay the levy. This figure has been arrived as
following analysis of the rateable value of all businesses within the defined footprint of the
BID area on the basis of the following factors: 
i) Identification of the rateable value applied to each business; 
ii) Balanced selection of those businesses above a given threshold to produce a
cost effective outcome for a given BID levy revenue base on the basis of
manageability. 
Applicable BID Levy Rate 
The levy will be calculated with reference to the rateable value of each property within the
BID area.  Each rateable value will fall within a banding as follows: 
Page 488

Page 479

RV range
Total levy per
business 
£3,000 - £8,399 150
£8,400 - £13,399 250
£13,400 -£39,999 380
£40,000 - £65,999k 530
£66,000 - £99,999 890
£100,000 - £179,999 1030
£180,000+ - £499,999 2300
£500,000 and above 5000    
The banding of each property will be determined by their rateable value on the date of the
ballot. 
New Properties and Tenancies 
The BID Levy charge will become payable by new properties and tenancies entering the
Valuation Roll at their date of occupation.  For these properties and tenancies, the BID Levy
charge normally applicable for the complete financial year will be pro-rated for the part of the
year. 
Charitable Organisations and not-for-profit organisations
Charitable organisations will be exempt from payment of the levy, except where they are
charitable retailers or accommodation providers. 
The following organisations and bodies will also be exempt from payment: 
• All places of worship 
• All not-for-profit clubs and organisations
• ATM machines and billboards 
• Schools, Pre-5 day nurseries and library
• Social care, housing association & health care premises
• Emergency services: Police, Fire station, Lifeboat
Page 489

Page 480

Empty Properties 
Under the Non Domestic Ratings system the liability for empty properties reverts to the
property owners in all cases where the lease has terminated. 
In the event a property becomes vacant the BID levy will be charged to property owners for
the proportion of time the property remains vacant in any one financial year. 
Levy Charges 
The BID levy will be payable on receipt of the separate BID Levy Invoice which will be issued
by the Council on behalf of the Oban BID in compliance with the requirements of this
Agreement. 
Term of BID 
The term of the BID Company will not be greater than 5 years from the date of the
announcement of the BID ballot result. 
Prior to the expiry of the term of the BID a re-ballot will take place. 
Non Domestic Rates Re-Valuation 
The rateable value of a business property may be revalued by the Dunbartonshire and Argyll
& Bute Valuation Joint Board during the BID Term. However, the BID Levy will continue to
be based on the rateable value at the date of the ballot irrespective of any such revaluations.
The only changes that will be reflected will in respect of splits, mergers and re-organisations
where the original rateable value may be apportioned differently over a number of properties.
The BID Levy will be updated to reflect these changes only. 
Application of VAT to BID Levy Invoices 
The BID Levy charge will NOT be subject to VAT. 
Inflationary Increases to BID Levy Charge 
The BID company will decide whether or not to index-link the levy payment (using CPI) to
take account of inflation. 
Page 490

Page 481

Part 2                The Baseline Services
Service Area 
Activity Area Street Cleansing and Litter Bin Emptying 
Description/
Specification
Litter control around the BID area in compliance with EPA requirements. 
To clean all routes to the required standard (A Standard) of cleanliness,
being free of litter and refuse at the end of each sweep. Attention to dog
fouling, flyposting, graffiti, and flytipping as required.  Education and
Enforcement actions.
Contact Stuart McCracken – Amenity Services Performance Manager  01631
569160
Existing Activity Works managed and carried out by Argyll & Bute Council staff, seven
days a week
Operational Times Street Cleansing 
Mon to Thurs 07:00 - 1500, Friday 07:00 – 14:30 
1 x manual barrow sweeper
Wednesday – Saturday 07:00 – 15:00, Sunday 07:00 – 14:30
1 x manual barrow sweeper  
Friday – Monday 07:00 – 15:00, Tuesday 07:00 – 14:30
1 x manual barrow sweeper  
Litter bin emptying (42 throughout the BID area)
Summer – once per day, more frequently as required or directed by
supervisor.
Winter – 3 times per week, more frequently as required or directed by
supervisor
Staffing and
Equipment Levels
Full time equivalent staff allocated to BID area = 4.6
Key Performance
Indicators
LEAMS (Local Environmental Audit and Management System) Street
cleansing monitoring assessments twice per year by external monitors.
(Local Authority and Keep Scotland Beautiful)
LEAMS cleanliness inspections monthly by in-house staff.  LEAMS
values  are consistently in the mid 70s over the last year, comparable
with the national standard of 74 (2010/11).KSB national standard is 67,
Amenity Services have set a standard level of 73 with a view to
performing at the highest possible standard.
Existing Value of
Contract/Service
£183,819*
Boundary Area All roads within the BID area
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure
Sites which fail to meet required standards are attended to within 24hrs 
Additional
Information or Notes
Main litter sources are smoking, drinks, fast food and confectionary
related.
* cost shown is an approximate value based on revenue budget
allocation for service provision in the Lorn area.
Page 491

Page 482

Capital expenditure in the BID area is determined in accordance with the
council’s service asset management plan and will vary from year to year,
being additional to the revenue figure if such works are scheduled.
Service Area 
Activity Area Commercial Waste Collections*
Description/
Specification
Collection and disposal of commercial waste, including recyclables
(paper/card/glass, in line with individual commercial waste contracts
Contact Stuart McCracken - Amenity Performance Manager  01631 569160
Existing Activity Works managed and carried out by Argyll & Bute Council staff, five days
a week.
Collection and disposal of commercial waste from 373 business
premises, including commercial recycling (paper/cardboard) collection in
line with individual contract agreements.
Servicing of commercial glass bins is carried out by Greenlight on the
council’s behalf.
Operational Times Core  7am – 4pm Monday – Friday.  Special services as required.
Staffing and
Equipment Levels
3 operatives, 1 refuse vehicle, 1 paper collection vehicle, 10tonne mini
RCV for difficult access areas, 1 multilift/skip vehicle.  (resource shared
with domestic collection) 
Full time equivalent staff on commercial waste collection in BID area = 
1.8
Key Performance
Indicators
Collation of missed bin reports
Existing Value of
Contract/Service
£231,282.23
Boundary Area All contracted premises within the BID area
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
*domestic waste collection is additional to this service but has been
requested not to be included within this documentation.
Contract value shown is the total charged to customers. 
Page 492

Page 483

Service Area 
Activity Area Horticultural and Grounds Maintenance Works
Description/
Specification
The council carries out planting of seasonal bedding, maintenance of
shrub beds, grass cutting, hedge trimming, hard surface management
(sweeping of paths etc), tree maintenance  and maintenance of sports
pitches.  
Contact Stuart McCracken - Amenity Performance Area Streetscene Manager 
01631 569160
Existing Activity Works managed and carried out by Argyll & Bute Council staff, five days
a week. 
This includes work to raised brick planters, and at various open spaces
around the BID area, such as McCaigs Tower, Corran Parks, Pulpit Hill
and Ganavan.
Maintenance of 61 public benches is also carried out by this unit.
Design and implementation of bedding schemes
Weedspraying, litter control, leaf clearance.
Grasscutting frequencies are site specific ranging from weekly (on sports
pitches) to eight weekly on lower profile sites.
Floral bedding displays are overhauled and replaced twice per year,
including those in mobile planters, of which there are some 26 around
the town
Operational Times Core 8am – 4pm Monday – Friday.  Additional hours as required for
special events.
Staffing and
Equipment Levels
1 gardener, 1 horticultural mechanic, two grounds maintenance staff 
General horticultural hand tools, spraying equipment and lawnmowers
Specialist sports turf maintenance equipment is held at Mossfield for use
on sports pitches throughout the area.
There are no operational cemeteries within the BID  area
Full time equivalent staff allocated to BID area = 3
Key Performance
Indicators
Adherence to grass cutting frequencies.  Quality inspections carried out
by supervisory staff and rectification action taken where necessary
Existing Value of
Contract/Service
£176, 932
Boundary Area All activity within BID area
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
Cost shown is revenue recharge rate. 
Capital expenditure in the BID area is determined in accordance with the
council’s service asset management plan and will vary from year to year,
being additional to the revenue figure if such works are scheduled. 
Page 493

Page 484

Service Area 
Activity Area Roads, pavements and carpark maintenance (including winter
maintenance)
Description/
Specification
Maintenance of roads, pavements and carparks.  In addition to a general
duty of care, legislation provides the basis for powers and duties relating
to Road Maintenance.  Primarily the Roads (Scotland) Act 1984 and The
New Roads and Streetworks Act 1991.
Scheduled maintenance activities include:  drainage works, patching,
pavement maintenance, signage, gritting and winter maintenance.
Major resurfacing works are also scheduled when capital budget is made
available.   
Inspection
Roads – annual survey by contractor (WDM), followed by more detailed
inspection where potential defect development has been identified.  Also
inspection for safety defects at intervals laid down in maintenance plan.
Culverts and manholes – inspect and clean annually
Gullys – inspect and clean 3x in two years
Fences/barriers/railings  – inspected every two years
Contact Callum Robertson – Roads Performance Manager  01631 569197
Lyndis Davidson – Network & Standards Manager 01546 604 396
Existing Activity Works managed and carried out by Argyll & Bute Council staff, with
specialist contractors brought in when necessary.
Operational Times Core  8am – 4pm Monday – Friday
Winter maintenance times (winter gritting) may be outside these hours in
accordance with weather pattern. 
Staffing and
Equipment Levels
A roads maintenance team is based in Oban but carries out much work
beyond the perimeter of the BID area.  
Within the bid area there are 36.4km of adopted roads 
Full time equivalent staff = 4  (dependant on variances in annual capital
works such as major road resurfacing)  A variety of vehicles are available
to be deployed depending on type of works being undertaken.
The trunk road network is maintained by Scotland TranServ  In Oban this
is the A85, George Street, Esplanade, Airds Place and Stafford Street
(west of George Street)
10 Pay & Display car parks are provided and managed within the BID
area.  Lochavullin car park remains free to use.
Car Park locations:
Ganavan  P&D
Corran 1 Seasonal P&D
Corran 2 P&D
Longsdale coach park P&D
Longsdale car park FREE ( subject to an order to introduce charges)
Esplanade P&D
North Pier P&D
Albany Street P&D
Market Street P&D
Lochavuillin car park FREE (subject to an order to introduce charges)
Lochavuillin coach/lorry park – P&D
Tweedale Street – P&D
Page 494

Page 485

Key Performance
Indicators
Key Performance Indicators collated and reported.
Quality inspections carried out by supervisory staff and rectification
action taken where necessary.
Category 1 defects should be made safe within 24 hours of identification. 
Others will be inspected and dealt with as resources permit.
Existing Value of
Contract/Service
£83,000* (including winter gritting operations)
Boundary Area All roads, pavements and carparks within the BID area, with the
exception of those managed by Scotland Transerv
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
* cost shown is an approximate value based on revenue budget
allocation for service provision in the Lorn area.
Capital expenditure in the BID area is determined in accordance with the
council’s service asset management plan and will vary from year to year,
being additional to the revenue figure if such works are scheduled. 
Page 495

Page 486

Service Area 
Activity Area Street lighting maintenance
Description/
Specification
Provision and maintenance of street lighting and associated electrical
control boxes. 
Contact Lyndis Davidson – Network and Standards Manager  01546 604396 
Existing Activity Works managed and carried out by Argyll & Bute Council staff
Operational Times 8am – 4pm Monday - Friday
Staffing and
Equipment Levels
Electrical maintenance is carried out by staff shared with other areas. 
There is no permanent presence in the town. 
Within the bid area there are 1844 electrical units (including traffic
control, street lamps and junction boxes) maintained. 
Typically, duties are reactive and include a variety of electrical and
lighting repairs, along with programmed maintenance works.
Inspection - Lighting columns are inspected a minimum of every four
years.  
Full time equivalent staff =0.5  equipped with specialist lighting platform. 
Lighting along the trunk road network is maintained by BEAR Scotland. 
In Oban this is the A85, Dunollie Road, George Street, Esplanade, Airds
Place and Stafford Street (west of George Street).
Key Performance
Indicators
Key Performance Indicators collated and reported.
Quality inspections carried out by supervisory staff and rectification
action taken where necessary
Response time for defects is within 5 working days and this is currently
being achieved at a level of 96% 
Existing Value of
Contract/Service
£10,000*~
Boundary Area Lighting to all roads, pavements and carparks within the BID area, with
the exception of those managed by BEAR Scotland.
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
* cost shown is an approximate value based on revenue budget
allocation for service provision in the Lorn area.
Capital expenditure in the BID area is determined in accordance with the
council’s service asset management plan and will vary from year to year,
being additional to the revenue figure if such works are scheduled. 
Page 496

Page 487

Service Area 
Activity Area Pier and harbour maintenance
Description/
Specification
Provision and maintenance of pier, slipway and harbour facilities
In addition to a general duty of care, legislation provides the basis for
powers and duties relating to these activities, including work to Harbour
and Docks Act 1847, Harbour Bylaws and Anti Terrorist legislation
concerning Marine Port Security.
Contact Stewart Clark  – Marine Operations Manager  01546 604893
Vicki McKenzie - Harbourmaster  01631 562892
Existing Activity Works managed and carried out by Argyll & Bute Council staff
Operational Times Core hours 9am – 5pm Monday – Friday but with significant variances to
suit peaks of activity eg at weekends and during summer months.
Staffing and
Equipment Levels
Harbourmaster and office, equipped with range of communications
equipment.
Oil spill response equipment.
The council has a responsibility to ensure piers within its ownership are
maintained in a serviceable condition.  In Oban these are the North Pier,
Oban Times Slip, and Port Beag. 
The harbourmaster is responsible for coordinating vessels which are
berthing at the council’s piers and collection of harbour and gangway
dues.  Provision of freshwater.
Waste management facilities are provided for vessels using council piers
and slips.
Key Performance
Indicators
Weekly checks of asset safety for Lifebelts and casings, navigation
lights, fenders, coping, bollards, ladders, walls, steps and slips.
Existing Value of
Contract/Service
£80,192.12
Boundary Area All activity within BID area
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
* cost shown is actual revenue expenditure for the BID area.
Capital expenditure in the BID area is determined in accordance with the
council’s service asset management plan and will vary from year to year,
being additional to the revenue figure if such works are scheduled. 
Page 497

Page 488

Part 3
Complimentary Services 
Service Area 
Activity Area Public conveniences
Description/
Specification
Provision, cleaning and maintenance of one public convenience in the
BID area.
Contact Stuart McCracken - Amenity Performance Manager  01631 569160
Existing Activity Works managed and carried out by Argyll & Bute Council staff
North Pier facility is staffed and cleaned throughout each day, but staff
are not in fulltime attendance. 
Operational Times North Pier open 8am – 9pm (Summer, April – October inclusive), 8am –
6pm Winter (November – February inclusive) 
Staffing and
Equipment Levels
Public convenience provision is not a statutory function of the council,
services are provided as approved by elected members.
Full time equivalent staff = 2 (1x 28hours contract; 1x 26 hours contract)
No specialist equipment
Key Performance
Indicators
Cleanliness inspections are carried out along with annual building
assessment surveys.
Existing Value of
Contract/Service
£51,500* 
Boundary Area Within the BID area 
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
Provision of public conveniences is discretionary ie not a statutory
function
* cost shown is an approximate value based on budget allocation for
service provision in the Lorn area.  
Capital expenditure in the BID area is determined in accordance with the
council’s service asset management plan and will vary from year to year,
being additional to the revenue figure if such works are scheduled.
Consideration is being given to opening Ganavan during the winter
months in future. 
Page 498

Page 489

Service Area 
Activity Area Road signage and street furniture
Description/
Specification
Maintenance of road signs, direction finger posts and benches.
Signage inspected and cleaned annually. 
Benches subject to annual collection, maintenance and redistribution. 
Contact Stuart McCracken - Amenity Performance Manager  01631 569160
Existing Activity Works managed and carried out by Argyll & Bute Council staff
Operational Times Core  8am – 4pm Monday – Friday. Service provided as required.
Staffing and
Equipment Levels
Full time equivalent staff allocated to BID area = 0.1
Key Performance
Indicators
n/a
Existing Value of
Contract/Service
£2,000*
Boundary Area All activity within BID area
Proposed BID
Additional Activity 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
Locations of benches and finger posts noted separately as requested.
* cost shown is an approximate value based on revenue budget
allocation for service provision in the Lorn area.
Capital expenditure in the BID area is determined in accordance with the
council’s service asset management plan and will vary from year to year,
being additional to the revenue figure if such works are scheduled. 
Page 499

Page 490

Service Area 
Activity Area Festive Lighting  until no later than 2018/19
Description/
Specification
Erection of festive lighting along main shopping streets and dressing of 3
festive trees.
Contact Lyndis Davidson, Network and Standards Manager 01546 604396 
Existing Activity Works managed and carried out by Argyll & Bute Council staff
Operational Times As required
Staffing and
Equipment Levels
Ad hoc staff allocation as necessary for erection and dismantling only. 
Lighting units are supplied and maintained by others.
Key Performance
Indicators
n/a
Existing Value of
Contract/Service
2011 cost was £16,000 
Boundary Area Main shopping streets within BID area
Proposed BID
Additional Activity
The council is in separate discussions with BID in relation to community
led delivery from 2018/19 onwards 
Cost of  BID
Additional Activity 
Non Compliance
Procedure 
Additional
Information or Notes
Provision of festive lighting is discretionary i.e. not a statutory function,
and the funding covers 2017/18 and 2018/19 only. 
Page 500

Page 491

Part 4 
Breakdown of Council’s Annual BID Levy collection and administration charge 
Staff time for annual billing, monthly remittances, issue of reminders
and finals, issue of adhoc bills for tenancy & other changes, raising of
summary warrants, dealing with ratepayer queries. 
£4650
Outlays: printing, stationery, postage and summary warrant fees £1850
Total  £6500 
Page 501

Page 492

Notwithstanding the requirements as laid down in the foregoing Agreement, Part 4 of the
Schedule – BID Levy Detailed Operating Procedures, represents the detailed operating
procedures and responsibilities associated with the management of the BID Levy Invoices,
BID Levy Payments, BID Revenue Account, Transfer Payments and Bad Debt provisions. 
BID Levy Invoices 
1. BID Levy Invoices shall be issued by the Council on behalf of the BID Company;
2. The layout and content of the BID Levy Invoices shall follow a similar format to that of the
non- domestic rates format but use BID logo;
3. Applicable Terms & Conditions shall be included at the rear of the BID Levy Invoice and
in principle shall be similar to those applicable to the payment of non domestic rates;
4. Bank account details for payment of the BID levy by each eligible business shall be
included on the BID Levy Invoice and shall be the same as that for the payment of the
non domestic rates the Council. 
BID Levy Payments 
1. Payments shall be made on an annual basis, at the start of the BID term, and on the
anniversary of the start of the BID Term for the following 4 years,  pursuant to Clause 8.6
of this Agreement as a single payment or in 10 monthly instalments where the levy
invoice is more than £150;
2. Levy payers shall have the option to pay the Direct Debit, online into the nominated bank
account as described above or by cheque;
3. BID Levy Invoices shall be issued for new properties, amended properties, including
split, merged and re-organised properties on a pro-rated basis for the remainder of the
financial year. 
BID Revenue Account 
1. Levy payments shall be paid by the BID Levy Payers into the Council’s General Revenue
Account and held in this account on a temporary basis until such time as the funds can
be transferred to a separate BID Revenue Account;
2. The BID Revenue Account shall be operated in accordance with schedule 3 of the
Regulations; 
Remittances of the BID Levy to the BID Company
Page 502

Page 493

1. Remittances from the Council’s BID Revenue Account shall be made expeditiously to the
BID Company’s bank account, but no later than 30 days from the date of the BID invoice
raised by the BID company and generally in pursuance with Clause 8 of this Agreement; 
Bad Debtors and Recovery of Bad Debts 
1. Bad debtors shall be identifiable by review of the list of those eligible businesses that
have NOT paid the BID levy (ie. By exception only). In consequence it shall be the
responsibility of the Council to identify any bad debtors;
2. Notwithstanding the obligations on the Council pursuant to Clause 9 of this Agreement 
the BID Company shall offer every assistance to the Council to persuade BID levy
payers to make payment of the BID levy;
3. Bad debts recovered by the Council shall be paid into the Council’s General Revenue
Account for subsequent transfer to the BID Revenue Account. 
Part 5: MAP OF BID AREA 
Page 503

Page 494

Page 504

Page 495

Document is Restricted
Page 505 Agenda Item 22NOT FOR PUBLICATION by virtue of paragraph(s) 6, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 496

This page is intentionally left blank