Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
22 September 2022 
SUPPLEMENTARY PACK 1 
ARGYLL AND BUTE COUNCIL - ON A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE
COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD on THURSDAY, 29 SEPTEMBER 2022 at
10:30 AM 
I enclose herewith an amended report and appendices for  item 20 (LEARNING ESTATE
INVESTMENT PROGRAMME (LEIP) - POTENTIAL BID FOR NEW MULL CAMPUS) which
should replace that previously issued with the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
AMENDED REPORT 
REPORTS WITH EXEMPT APPENDICES 
20. LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) - POTENTIAL BID FOR
NEW MULL CAMPUS 
(a) Report by Executive Director with responsibility for Commercial Services
and Education (Pages 3 - 12) 
(b) Appendix A (Pages 13 - 14) 
E1  (c) Appendix B (Pages 15 - 18) 
(d) Appendix C (Pages 19 - 22) 
E1  (e) Appendix D (Pages 23 - 32) 
The Council will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:-
Public Document Pack

Page 2

E1    Paragraph 8  The amount of any expenditure proposed to be incurred by the authority
under any particular contract for the acquisition of property or the supply of goods or
services.
Paragraph 9  Any terms proposed or to be proposed by or to the authority in the course of
negotiations for a contract for the acquisition or disposal of property or the supply of goods
or services. 
Argyll and Bute Council   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 3

ARGYLL AND BUTE COUNCIL                                         COUNCIL
EDUCATION/ 
COMMERCIAL SERVICES                                                           29 SEPTEMBER 2022 
LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) UPDATE
POTENTIAL BID FOR NEW MULL CAMPUS 
1.0 EXECUTIVE SUMMARY 
1.1 The Learning Estate Investment Programme (LEIP) is the Scottish
Government’s flagship programme for investment in education and is
now into Phase 3.  It is the successor to the ‘Schools for the Future’
programme which our Council has delivered new builds or substantial
refurbishments across our education estate at Oban, Kirn, Dunoon and
Campbeltown.  Our Council has not applied for previous phases of LEIP
and there has been encouragement for a Scotland wide engagement
with the programme. There is currently no assurance there would be a
subsequent phase of LEIP or prioritised funding for education in future
years of this parliament until 2026.   
1.2 The Scottish Government has recently clarified the timescales and
application process for LEIP Phase 3 and this report aims to update
Council where our team are with the development of a bid for this
nationally competitive fund and seek the appropriate financial and
political commitment to proceed with submission in October.  It also
seeks to update on engagement recently taken place with our education
staff, stakeholders and communities that will assist our bid and inform
the next steps of the application process should we progress to the next
stage following backing from the Scottish Government.  This pre-
engagement which is a non – statutory process has been valuable in
identifying early issues, communities to engage with at future
consultations and test methods of communication.   
1.3 The Council’s Learning Estate Strategy (adopted November 2021) has
identified the priorities in terms of education new build are focussed on
delivery of new campus opportunities on our islands of Mull and Islay
based on the assessed fabric condition and learning suitability.  Of these
two locations, Mull is our preferred bid for LEIP funding and top priority
based on a number of suitability criteria, most notability the current
suitability of our current estate in Tobermory.  Given that LEIP will only
fund up to 50% of construction costs with remainder having to be
resourced by Council or other sources it would be unaffordable to
Page 3 Agenda Item 20a

Page 4

progress with 2 bids at this current time.  Furthermore, given the
nationally competitive nature and likelihood of oversubscription to this
fund we are also looking to consolidate with a single unified bid for Mull
– rather than twin tracking multiple applications.   
1.4 Given the financial scale of the ask, which will be measured in several
tens of millions of pounds to the Council, and clear political commitment
it is essential there is a mandate by Council to progress with a bid of this
scale and significance.  To this extent, a clear direction is requested from
Council on where to make a LEIP bid submission by the deadline date
of 31st October 2022, or not.  The full application will continue to be
worked on up to submission date but a draft is contained at Appendix
D. 
Page 4

Page 5

ARGYLL AND BUTE COUNCIL                                                COUNCIL
EDUCATION/ 
COMMERCIAL SERVICES   29 SEPTEMBER 2022 
LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) UPDATE
POTENTIAL BID FOR NEW MULL CAMPUS 
2.0 RECOMMENDATION 
That the Council: 
2.1.1  Note that the Scottish Government has confirmed the timescales for the
next round of the Learning Estate Investment Programme (LEIP) i.e.
inviting submissions by 31st October.   
2.1.2  Note a business case and application is being prepared for a submission
to the LEIP process for a new Campus on Mull in line with the adopted
Learning Estate Strategy; 
2.1.3  Note that pre-engagement activity has been ongoing with the Mull
community about the potential LEIP bid between August and 9th
September with over 200 representations or feedback received.  Further
statutory consultation will take place if a bid is made and successfully
progresses to the next stage; 
2.1.4 Note and consider the financial position and affordability of a LEIP bid as
set out in attached Appendix B.  This appendix is exempt from
publication due to the commercially sensitive and competitive bid nature
of financial forecast information contained.   
2.1.5 Agree to proceed with the submission of a LEIP bid by 31st October
based on the entirety of this report, our priorities specified in the Learning
Estate Strategy, financial context and advice from Section95 officer
(Appendix B), pre-engagement feedback (Appendix C) and on the
basis that if our bid is successful, financial provision as estimated in
Appendix B will require to be made from 2023/4 onwards.   
3.0 Background
3.1 The Scottish Government launched the Learning Estate Investment
Programme (LEIP) in 2019 and aims to deliver over £2bn of education
estate jointly funded by them and Local Government.  There have been 2
phases of LEIP already and 37 projects across the country are now
Page 5

Page 6

underway at various stages with some nearing completion of construction. 
The 3rd phase was launched following the Local Government elections in
May this year.  Argyll and Bute Council are in the minority as we have not
applied for any LEIP funding thus far and it is notable that only 1 Island
project (Barra) has been successful in obtaining funding from across the
country.  There is a keenness for a wide and equitable sharing of this
government fund and Scottish Futures Trust (SFT) have encouraged Argyll
and Bute’s (and others) participation in round 3 of LEIP.  We anticipate it
will be a very competitive process with oversubscription of applications due
to this being last round of government funding on offer plus financial
challenges of all Councils.  To this extent, there can be no guarantee that
if a bid from Argyll and Bute is submitted it would be successful.   
3.2 The funding model for LEIP differs from the ‘Schools for the Future
Programme’.  In summary, successful local authority applicants will benefit
from the Scottish Government providing revenue funding for the new
builds through an annual payment over 25 years on the basis that certain
criteria are met.  These criteria include ‘condition of the building’ (to be
maintained as Grade A or B for lifetime), ‘energy efficiency’, ‘digitally
enabled’ and ‘supportive of economic development’. Recently added
criteria also apply to things like embodied carbon, EV charging
infrastructure, outdoor learning and infection control.  The Scottish
Government is likely to meet around 50% of the build costs over the 25
year lifetime.   Costs for elements such as purchase of land, residential
/ hostel accommodation, operational or running / revenue costs and
design development fees are also excluded from the LEIP funding that
is provided so Council would need to meet these in full.   
4.0 Timescales for Phase 3 – Political, Financial & Community Commitment 
4.1 In December 2021 the Cabinet Secretary for Education and Skills outlined
to Parliament that LEIP Phase 3 would seek projects within 12 months. 
The following are the most up to date timescales for the programme:- 
• 1st July 2022 – LEIP Board wrote to CEO to invite
submissions;
• 11th August 2022 – Pre-engagement Community Meetings
Mull;
• 29th September 2022 – Argyll and Bute Full Council to
consider;
• 31st October September – Local Authority Submissions;
• December 2022 – LEIP Board announcement of successful
bids;
• December 2027 – New facilities to be opened 
A more detailed routemap can be seen at Appendix A. 
4.2 The Scottish Government have set out a number of detailed
requirements for submissions and are encouraging Councils in their
applications to cover: 
Page 6

Page 7

a) Local investment priority(s) and their context within the ‘Place’
b) The proposed Vision, Strategic Outcomes and Objectives for
the project(s)
c) Alignment with Learning Estate Strategy 2019 Guiding
Principles
d) Ensuring political and financial commitments are in place for
the investment priority(s)
e) Demonstrating implementation of the terms and conditions of
the programme on Phase 1&2 projects (where applicable). 
4.3 The project team developing the bid are well progressed with the
proposition for LEIP 3 in the context of the above. 
5.0 Strategic Outline Case - Mull
5.1 In accordance with the Council’s adopted Learning Estate Strategy the
Council has prioritised cases for strategic change on Islay and Mull.  This
is based on current suitability and condition aspects of the current
infrastructure / estate but also noting the majority of mainland towns have
had new campus developed within the last 15 years and seeking to
address our islands on an equitable basis.  Previous Scottish Government
funding has been accessed to deliver new schools at Hermitage Academy,
Dunoon Grammar, Oban High, Oban Primary Campus, Campbeltown
Grammar, Rothesay Joint Campus, Lochgilphead Joint Campus, Dunoon
Primary (significant refurbishment) and Kirn Primary at a cost of around
£180m.   
5.2 Consistent with all local authorities our Schools are assessed in terms of
suitability (from an educational perspective) and condition (from a building
fabric perspective).  The current assessments highlight:- 
SCHOOL CONDITION
CRITERIA
SUITABILITY
CRITERIA
ALL Islay B B
ALL Mull
(excluding
Tobermory)
B B
Tobermory
Campus
B C 
Definition of Condition 
B = ‘Satisfactory’    Condition C = ‘Poor’ 
5.3 Given current Tobermory Campus is assessed to be ‘C - poor’ in terms of
suitability there is a requirement to improve the situation and that is
therefore our top priority. The lower grading of Tobermory is largely driven
Page 7

Page 8

by accessibility, restrictive drop off space, lack of social spaces and
restricted specialised classes.  Given that LEIP will only fund up to 50% of
construction costs of eligible spaces with the remainder having to be
resourced by Council or other sources it would be unaffordable to progress
with 2 bids at this current time.  Given the nationally competitive nature and
likelihood of oversubscription to this fund we are also looking to consolidate
with a single unified bid for Mull – rather than twin tracking multiple
applications.   
5.4 Analysis of the council expenditure on Mull also highlights a trend of
increasing reactive or maintenance spend and a sizable sum of
investment on degrading fabric at the high school over the past 5 years.
Items like water ingress in roofs + electrical upgrading is common source
of expenditure.  The condition of the building can be improved from further
investment, however the suitability is much more challenging to be
upgraded without wholesale remodelling.  Such year on year construction
can be detrimental on both pupils and learners over long period of time or
require decanting of operations for periods.  Other environmental (climate
change) standards or digital enhancements will also remain below the
minimum standard compared to a new build LEIP school.   
5.5 The services of Hub North (who assisted in development of some of our
previous school projects) and the Northern Alliance (an Education
focussed support network) have led to the development of a ‘Business
Case’ for Mull.    As this is a strategic or initial business case no specific
sites or models have been tested.  The bid, if progressed, would be an
application for funding to benefit the entire island of Mull.  More detailed
site selection and analysis of costs will require to be completed if we are
selected by the Scottish Government to proceed to the next stage of the
process.  It is the responsibility of the Council to meet all design
development, consultations, site assessment and land acquisition costs
up front.   
6.0 Financial Case & Affordability 
6.1 As we know from experience the construction of new public infrastructure
– particularly the education estate and on islands – comes with significant
financial commitment.  As a benchmark the new Oban High and
Campbeltown Grammar cost in excess of £36m and £26m, respectively. 
At this stage high level numbers and financial forecasts are being worked
on to allow for budget planning and decision making.  It will be necessary
to identify suitable ‘island weighting’ and construction sector inflation to
budgets given the nature of building on Mull. Budgetary figures will be
refined and crystallised if successful in progressing to the next stages of
LEIP process and during site selection but enough information is present
to provide an informed range of costings or financial outlay that will be
required.   
6.2 A refurbishment option was also considered and the cost was substantial. 
The consultant has advised that whilst this would improve the condition of
Page 8

Page 9

the building (from a building fabric perspective) it would not address the
suitability of the building from an educational perspective and therefore the
suitability criteria would remain as C=Poor.  For these reasons this option
has not been progressed any further. 
6.3     Information relating to finance is contained within Appendix B for elected
Member consideration.  Some of the financial information is sensitive due
to commercial and competitive nature of the bid at this stage and is
therefore publicly restricted.   
6.4 At the levels of investment that are being considered there is no denying
this will be one of the biggest public sector infrastructure projects on the
island in many years and has potential for regeneration and economic
stimulus. Jobs created during construction period and longer term
attraction of a modern campus with modern facilities can act as a catalyst
for change.  Depending on site selected it can also have secondary
benefits – as we have seen in Helensburgh where the new Hermitage
Academy has now had a supermarket, business park and new housing
development expanded on 3 sides of it since its construction.  Site
selection will have a key impact on overall affordability and financial context
as things like ground conditions, land ownership, availability of labour and
decant (if required) will all need to be considered.   
7.0 Engagement 
7.1 For such a significant transformational investment to succeed it is essential
to understand and engage with our communities.  There is no statutory or
Government requirement to consult with our communities prior to a LEIP
Submission being made in October.  However, submitting evidence that
we have commenced some form of awareness raising and engagement
with our communities is likely to strengthen our submission in this
competitive process. If successful in our application a formal and statutory
period of community consultation would follow as outlined at Appendix A.     
7.2 The team have undertaken a pre-engagement exercise with stakeholders
on Mull and a number of workshops have been held on 11th August and 7th
September.  Social media campaign and 1:1 discussions with Community
Groups also took place.  The engagement and message has been at a
high level with the purpose of the pre-engagement being primarily to allow
stakeholders to confirm if they have ambition for a new campus based on
Mull.  The process has also been really useful as in dialogue with the
community we have been finding additional ways of communicating and
ensuring that all messages reach all groups of interested community
members. Should we be successful in the funding submission, this will all
be extremely useful to shape the engagement programme for the Statutory
Consultation.  Some of the messaging has been about the background to
LEIP Process, headlines from the business case, photos / videos of
schools Council has developed in past, next steps and timescales.   
7.3 The Stakeholders have included:
Page 9

Page 10

• Ward Councillors
• HT & School Staff
• Parent Councils
• Pupils
• Community Councils
• Wider Public 
7.4 A summary of the feedback obtained thus far is contained at Appendix
C.  With main headlines being
• Overwhelming support for a new campus on Mull to serve island +
Iona;
• Varying views on location of new campus – central island VS
Tobermory;
• Importance of widespread engagement with all parts / groups of
Community;
• Interest from some in Hostel accommodation that could address
long travel issues (we should note however that this has been
relatively low and early indications are that the addition of a new
hostel would not qualify for LEIP funding and the potential costs
would be substantial);
• Range, scope and importance of community facilities integrated;
• Staffing and curriculum assurance and attainment; 
7.5 Unanimous support for a new campus has been expressed thus far but
feedback on location was overwhelmingly of most interest to
participants.  To be clear, the bid will be for a campus on Mull, with
location and site specific’s to be considered and engaged on if we do
progress to next stages in 2023 onwards.  There are varying degrees of
interest for hosting the new site in or around Tobermory (the existing
town for the campus) but also in a more central island location.  There
are a range of complex positions on both.  Whilst this is not a matter to
be considered now or before LEIP bid is submitted in October it is
essential that Members are aware there is a divergence of views within
the Community on where the campus should be located and there is
potential for disappointment or conflicting views that require to be
considered alongside management of expectations. 
8.0 Summary and Next Steps
8.1 The Council is invited to instruct officers to continue with preparation and
submission of LEIP Bid by 31st October 2022 based on the information
contained herein.  This decision needs to be considered in the context of
the educational priorities contained within our Learning Estate Strategy,
learning benefits, regeneration, condition / suitability of the current
building, community and overall affordability.   
8.2 All LEIP applications will be considered by a Scottish Government
appointed panel with final decision resting with Ministers.  The Panel is
Page 10

Page 11

programmed to write back to all applicants in December 2022 with
outcome.  Feedback will be reported back to full Council in early 2023.   
9.0  Implications 
9.1  Policy –  The Council’s Learning Estate Strategy 2021 sets out that the
ambition is to provide a property school estate that is of category A or B
in terms of suitability and condition plus a number of other 
modern standards.  Seeking to access LEIP funding to deliver new 
build estate on our priority location, Mull, supports that ambition. 
9.2    Financial  - Accessing LEIP is a significant financial commitment to the
Council as the entire design development, associated cost like land 
acquisition (if required) and construction costs will be required to be 
met in full by the Council.  The SG would then provide up to 50% of 
eligible capital costs back over 25 year annual payment if criteria is 
met.  There is risk in this model should criteria not be met and also 
in terms of risk of construction in current climate so specific financial 
and affordability advice from Section 95 Officer has been provided.   
9.3      Legal –  Accessing LEIP is a significant contractual and legal
commitment to the Council  which will be duly considered if move to next
stage.   
9.4      HR –  None at this stage.  Considered at future stages if progress.   
9.5      Fairer Scotland Duty
9.5.1 Equalities –  None at this stage.  Considered at future stages if                  
progress.  
9.5.2 Socio-economic Duty – The level of investment in a new Campus   
will be substantial and Scottish Government have set requirements 
to deliver socio economic benefits if progressed.
9.5.3 Islands – Positive implications given top priority in this competitive            
process has been identified as Mull.   
9.6   Climate Change – Scottish Government have set requirements to key    
climate change criteria and benefits if progressed 
9.7  Risk –  Risks exists both in terms of financial and reputational.  If progress  
to next project stages a risk register will be developed.   
9.8  Customer Service – Pre-engagement has commenced and will be              
ongoing throughout process as progress.   
Page 11

Page 12

Douglas Hendry – Executive Director with responsibility for Commercial
Services and Education. 
Yvonne McNeilly – Policy Lead for Education 
For further information contact: 
Ross McLaughlin, Head of Commercial Services        
Ross.mclaughlin@argyll-bute.gov.uk 
Appendices 
Appendix A – Routemap
Appendix B - Financial & Budget Position (PUBLICALLY RESTRICTED) 
Appendix C - Pre-Engagement Feedback
Appendix D – Draft Submission – working draft for 31st October (PUBLICALLY
RESTRICTED)
Page 12

Page 13

Mull
Learning
Estate
Complete Complete
Update Bus Case
Prepare initial site layouts and
develop initial project costs
Complete
A&BC Internal Review
Initial consultation with A&BC Directorate and Finance
Jun-22
Initiate SFT Contact
Pre-application contact with
officers and education team
Jun to
Aug-22
Pre-Engagement
Dec-22
Jan-23
to Dec-
23
Strategic Services
Development of Intelligent Brief
RIBA Stage 1 & 2
Jan-23
to Dec-
23
Consultation Engagement Level Two
School & Community
Jan-24
to Apr-
24
Hub Stage 1
May-
24
A&BC Gateway
Governance review period
May-24
to Mar-
25
Apr to
May-
25
Contract Close
Governance Gateway
Jun-25
Mobilisation
Jul-25
Possible Decant
Aug-25 to Jul-27
Construction
Dec-
27
Draft Business Case
Initial draft document setting
out base case
Operational Live
Business Case to
Delivery
Engagement Level One
Initial consultation with A&BC members,
schools and communities
SFT/SG
Approval
Conditional approval of business case and LEIP3 funding
RIBA Stage 3
Hub Stage 2
Complete design and
Market Testing
Sep to
Oct-22
Jan-23
to Apr-
24
LEIP3 Submission
Revise business case documents to
take account of finalised LEIP3
requirements from SFT/SG
Statutory Consultation
Duration will depend on necessary
scope of options
Where we
are now
Page 13
Agenda Item
20b

Page 14

This page is intentionally left blank

Page 15

Document is Restricted
Page 15 Agenda Item 20cNOT FOR PUBLICATION by virtue of paragraph(s) 8, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 16

This page is intentionally left blank

Page 17

Appendix C – Pre-Engagement Feedback 
A series of pre-engagement sessions were held in Tobermory High School on Thursday
11 August and in Bunessan Primary School on Wednesday 7 September, both of which
were well received. 
There were sessions for school staff; parent / community Councils; Parents and public.
Each of the sessions had a presentation from Wendy Brownlie, Head of Education and
Ross McLaughlin / Shirley Johnstone, Commercial Services providing information
around why Mull was considered the councils priority, and the LEIP funding and Learning
Estate Strategy. 
There were information boards which provided examples of completed projects within
Argyll and Bute and nationally to demonstrate the sort of learning environment that can
and has been achieved. 
There was an opportunity for attendees to speak to the team made up of education and
commercial services officers (also supported by colleagues from the Northern Alliance at
the meetings held on 11 August), with all attendees being encouraged to leave feedback
and comments. 
Pupil engagement sessions were held during the weeks of 15th and 22nd  August 2022
and further feedback on the comments and views expressed by pupils were gathered
from all sessions. 
Summary of the attendees and responses   
0
20
40
60
80
27 18 23
3
62
Pre-engagement session attendance
Bunessan
Community
Parents & Carers
PC & Community Council
Chairs
School Staff
Page 19 Agenda Item 20d

Page 18

Response to the Exit Poll question 
The exit poll question at each session in both Tobermory and Bunessan and at each
of the school sessions with pupils was “Do you want us to progress with the Learning
Estate Investment Programme funding application for a new campus on Mull?” 
At all of the sessions for teachers, parents, public (primarily attended by adults) there
was a unanimous “Yes” with no one responding with “No”. 
The pupil sessions was slightly different.  The chart below shows the total number of
responses received through all of the face to face sessions and the support received
by email: 
Following the pre-engagement sessions, all of the information provided on the day is
was made available on the council’s website at www.argyll-
bute.gov.uk/consultations/mull-campus with a dedicated email address for anyone to
provide a comment / view.  Through communications on the council’s social media
and through the schools and community councils there had been several reminders
and encouragements to leave a comment before 9th September.  Please see below a
summary of the topics that were raised: 
Unanimous support for a new campus has been expressed thus far but feedback on
location was overwhelmingly of most interest to participants.  To be clear, the bid will
13 4
57
45
16
112
131
1
35 21
0
Details of the Categories of Issues Raised
Accessibility
Buildings
Community
Curriculum
Hostel
In Favour
Location
Nursery/Pre5
Outdoor Facilities
295
46
39
Total
Sum of Yes
Sum of No
Sum of Not Sure
Page 20

Page 19

be for a campus on Mull, with location and site specific’s to be considered and
engaged on if we do progress to next stages in 2023 onwards.  There are varying
degrees of interest for hosting the new site in or around Tobermory (the existing town
for the campus) but also in a more central island location.  There are quite a range and
complex positions on both.  Whilst this is not a matter to be considered now or before
LEIP bid is submitted in October it is essential that Members are aware there is a
divergence of views within the Community on where the campus should be located
and there is potential for disappointment or conflicting views that require to be
considered alongside management of expectation.
Page 21

Page 20

This page is intentionally left blank

Page 21

Document is Restricted
Page 23 Agenda Item 20eNOT FOR PUBLICATION by virtue of paragraph(s) 8, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 22

This page is intentionally left blank