Corporate Plan
2023 - 2027
Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil … #abplace2b

Page 2

1. WELCOME .................................................................3
2. OUR VISION...............................................................4
3 OUR PROFILE ...........................................................5
4 OUR PLACE ...............................................................6
5 OUR PRIORITIES ......................................................9
6 OUR PRINCIPLES ...................................................16
7 MEASURING OUR PROGRESS ..............................17
Contents
Corporate Plan | 2023 – 2027 2
Argyll And Bute Council #abplace2b

Page 3

This Corporate Plan outlines our vision and strategic direction for the coming years. 
It embodies our shared aspirations, guiding principles, the £7m Priorities Investment
Fund and the actions required to fulfil our vision of a prosperous, inclusive, and
sustainable Argyll and Bute.
The landscape in which we deliver our services remains dynamic and ever changing.
We will continue to transform how we work so that we can deliver the services our
communities need and the prosperity the future of Argyll and Bute depends upon. 
The considerable challenges we identified in our previous corporate plan remain
unchanged – declining funding for our services, economic dependence on the public
sector, and an ageing population.
Central to our corporate plan is partnership. We recognise that by working together 
with our partners, stakeholders, and local communities, we can achieve far more 
than we could ever accomplish in isolation. We value the input and expertise of our
diverse community, for it is through active engagement and dialogue that we can 
build a brighter future for Argyll and Bute.
The Corporate Plan is not inclusive of all Council activity and focusses on the priorities
for the Council for the next four years. Detail on how we will deliver these priorities and
measure progress are set out in the Annual Business Plan.
As we embark on this transformative journey together, it is crucial that we remain adaptable
and responsive to the evolving needs and challenges of our time. Our corporate plan
serves as a compass, guiding our decision-making processes and ensuring that our
efforts are aligned with our strategic objectives. We are committed to delivering high-
quality services, enhancing infrastructure, and nurturing a vibrant economy that creates
opportunities for all.
1. Welcome
Councillor Robin Currie
Leader of Argyll and Bute Council
Pippa Milne
Chief Executive
Corporate Plan | 2023 – 2027 3
Argyll And Bute Council #abplace2b

Page 4

We have a vision for a successful, vibrant Argyll and Bute with a growing population
and a thriving economy. A place where people want to come to live, to work and to
do business as a result of action to combat and reverse decline. We see the potential
for thriving local economies that support our rich mix of remote, rural and island
communities. Communities which also benefit from services that work – where we 
make the best use of all of our resources so that our core business as a council is 
as effective as possible.
We want Argyll and Bute’s communities to be on a level playing field with others 
around the country – that is why we will campaign for equity for our communities 
on issues like fair funding, coping with challenges like the cost of living, and securing
digital access and physical access to other opportunities. We will do our utmost to
ensure that local voices and needs are taken into account in national decision-making.
We recognise that the cost of living crisis will affect countless households in Argyll 
and Bute. We want to play a part in responding to that and mitigating the impact on 
our communities’ overall wellbeing and future success.
We see our council and our communities working together in playing our part and
making our contributions to wider priorities like climate change, economic growth, 
strong local governance and more – using our strong track record in partnership
working, at all levels, to secure the best possible outcomes.
Our Priorities for the Council Term 2022 to 2027 are shaped around delivering this 
vision for Argyll and Bute, our people, our success and our future.
Argyll and Bute Council, 24 November 2022
2. Our Vision
Corporate Plan | 2023 – 2027 4
Argyll And Bute Council #abplace2b

Page 5

3. Our Profile
Argyll and Bute Facts – Place
ARGYLL AND BUTE POPULATION
ESTIMATE BETWEEN 2018 AND 2043*
inhabited islands
in Argyll and Bute
Scotland is predicted
to rise by 2.5%
over the same period
of the population
Islands account for
17%
23
of the population
are classed as
living in remote
rural areas
43%
This was mainly
driven by a decline in
the 25-44 age group
Argyll and Bute
population predicted
to drop by 14.8%
14.8%
9%
of total Scottish
land area
There are
The largest
settlement is
Helensburgh with
a population of
13,320 people
Giving a population density of
approximately 12 people per
square kilometre which is the
third lowest in Scotland
86,130
POPULATION
2,668
Argyll and Bute covers over
square miles and is the
second largest local
authority by area in Scotland
2.5%
*National Records of Scotland
This is the third largest
decline in population by
a council area in Scotalnd
Corporate Plan | 2023 – 2027 5
Argyll And Bute Council #abplace2b

Page 6

The public sector is operating in a dynamic landscape which brings with it many
challenges. The operations of the Council so far have risen to the challenge of meeting
substantial savings and to date have made over £70million in recurring savings since
2010-2011. This equates to around 26% of the total budget and with each passing year
it becomes more difficult to identify savings. There is therefore a need to develop the
organisation to be in a position to continue to meet the financial, policy and societal
challenges ahead.   
Assuming public sector finance will continue to fall (in real terms and against a
background of high inflation and demands for increased pay) and demands for services
will increase, the Scottish and Local Governments are seeking to reform the public
sector to improve outcomes whilst reducing costs.
Cost of Living
The ongoing cost of living crisis in the UK is felt particularly hard in rural and remote
rural areas. Argyll and Bute has;   
The highest percentage of people living in remote rural areas of all mainland
councils.
The third lowest median pay rate of all Scottish Local Authorities
Ranked most vulnerable to post COVID economic shock.
The on-costs of living in our communities range from 13% to 185% above costs in urban
UK areas. Nearly 70% of all households in Argyll and Bute are at risk of fuel poverty or
extreme fuel poverty.
4. Our Place
EquityEquality VS
Food, clothing, travel –
these cost between 13%
and 185% + more than 
in urban UK
UK /
SCOTLAND ARGYLL & BUTE
FOOD
HOUSEHOLD
GOODS
CLOTHING
FUEL
TRAVEL 185%
70%
34%
22%
13%
Corporate Plan | 2023 – 2027 6
Argyll And Bute Council #abplace2b

Page 7

Tackling Poverty
The council’s Financial Inclusion and Advice Group brings together council services
and support agencies. To make it as easy as possible for people to get support when
they need it, the council provides a ‘one-stop-shop’ of information on our website at
www.argyll-bute.gov.uk/advice-services to provide key information and also help and
information on money saving initiatives such as cheaper deals for internet connection
and the availability of warm spaces provide by other organisations.
The Council’s leadership will continue to lobby the government on the factors that are
affecting our citizens and businesses.
Transform our Economy through a Just Transition
to Deliver Net Zero
We recognise climate change as one of the biggest threats to communities. Argyll 
and Bute Council has reduced its carbon emissions by 27% over the past 5 years and 
is investing £1.2m to save energy. We are committed to driving down further our own
carbon emissions, achieving net zero by 2045 and exceeding our target of a 75%
reduction by 2030, building on our good track record in relation to combatting climate
change, through the delivery of our Decarbonisation Plan.
However, we cannot do this alone and will work with the Argyll and Bute Community
Planning Partnership to develop a Climate Change Strategy for the region as a whole.
Nearly 70% 
of households
in Argyll and Bute are
at risk of fuel poverty.
To avoid fuel poverty an average all-
electric household would need an income
of at least £72,200 per annum, or to
avoid extreme fuel poverty £39,600; 
this compares to a median household
income of just under £33,000 
(and excludes impact of increased 
costs elsewhere such as food).
The price cap announcement
does not help Argyll and Bute 
– the cost of heating homes 
here is estimated to be more
than double the price cap 
figure for an average household.
Food, clothing, travel – these cost between
13% and 185% + more
than in urban UK
however disposable income in 
Argyll and Bute is 10% less 
than the UK average.
Corporate Plan | 2023 – 2027 7
Argyll And Bute Council #abplace2b

Page 8

Argyll and Bute Community Planning Partnership
The Community Planning Partnerships (CPP) brings together local public services 
with communities they serve, and provides a focus for partnership working that targets
specific local circumstances. Partners work together to improve local services and 
to ensure that they meet the needs of local people, especially those who need the 
services most.
The Argyll and Bute CPP has completed its community engagement on identifying 
the priorities for the next 10 years (2023 - 2033) and these are:
1. Housing
2. Transport
3. Community wealth building1
A plan on how the CPP will seek to address these priorities will emerge in due course.
Argyll and Bute Council will continue to be a leading partner in the partnership and
ensure that the priorities of the CPP and the Council are aligned.
1.  Community wealth building; based on the premise that traditional economic development practice and developer-led regeneration are
failing to address the economic challenges of our time, Community Wealth Building is a person centred approach to local economic
development which redirects wealth back into the local economy and places control and benefits into the hands of local people.
Corporate Plan | 2023 – 2027 8
Argyll And Bute Council #abplace2b

Page 9

5.  Our Priorities to
Support Delivery
Of Our Vision
People and Places – our core business as a council
Attaining and achieving at all stages
We will improve outcomes for our children and young people by:   
Improving educational attainment, achievement and outcomes for young people
within Argyll and Bute to Scotland’s upper-quartile.   
Educational Attainment and Wider Achievement – Developing the use of all 
the available data and intelligence on each of our educational establishments 
to focus on and drive improvement, achieving our stretch aims (goals to 
improve opportunities and outcomes for young people) as agreed with the
Scottish Government.   
Developing a broader curriculum offer to augment current opportunities with 
a range of wider achievement awards and accreditations. This will have a 
positive impact on leaver destinations through inclusive, skills-based programmes 
in each secondary school.   
Continuing to promote the teaching and use of Gaelic as set out in the council’s
emerging Gaelic Plan for 2023.
EDUCATION
Corporate Plan | 2023 – 2027 9
Argyll And Bute Council #abplace2b

Page 10

Learning Estate – now and in the future
We will ensure our schools are effective, sustainable learning environments by:
Progressing a bid to the Scottish Government to establish a new campus on Mull.   
Develop the next generation of capital investment plan and priorities for our
school estate.
We will continue to support children and young people with additional needs
Continuing to support all of our children and young people with additional
support needs across Argyll and Bute, within our schools and other service 
areas by:
Reducing the number of children and young people who have to travel outwith 
the area to access services by enhancing provision where gaps currently exist.     
Working to improve and secure equity of specialist provision across Argyll and
Bute by addressing gaps where they exist across the education estate.     
Maintaining the current staffing complement who support this work, in line with 
our nurture stretch aim agreed with Scottish Government.  
Corporate Plan | 2023 – 2027 10
Argyll And Bute Council #abplace2b

Page 11

Roads and pathways
We will support connections to, from and within Argyll and Bute by:   
Reviewing our approach to road repair prioritisation to make the most effective
use of resources in the context of budget pressures and to achieve the best
possible balance in terms of strategic, operational and member input.   
Creating a plan, by 2025, for further active travel routes across Argyll and Bute
and completing the Helensburgh-Dumbarton cycle path by 2027.   
Initiating plans for a 20mph speed limit by working in partnership, and in line with
national legislation, on the rollout and delivery of a 20mph limit where that will
work best for our communities.   
Completing a review of parking and traffic management/enforcement to reshape
arrangements that reflect community needs and ambitions.
Piers and Harbours
In recognition of the importance of marine connections to and from our island and
mainland communities, our role in maintaining these links will include:   
Upgrading the council’s harbour infrastructure to ensure it is capable of receiving
existing and planned new ferries (including at Craignure, Fionnphort/Ruahaich,
Port Askaig, Dunoon,  Kilcreggan and Campbeltown).   
Creating a new municipal harbour authority in Oban, ensuring that proposals are
submitted to Scottish ministers as soon as possible following consideration by the
Harbour Board in December 2022, and putting preparations in place to commence
operations upon approval by ministers.   
Seeking funding for the procurement of new council-operated vessels including
Islay/Jura, Luing and Easdale.   
Finalising the demand, economic impact and business case assessment for the
Helensburgh Pier strategy in 2023.
ROADS, AMENITIES 
AND INFRASTRUCTURE
Corporate Plan | 2023 – 2027 11
Argyll And Bute Council #abplace2b

Page 12

Waste and recycling services
We will reduce our carbon emissions by:   
Delivering a solution that enables the council to divert its biodegradable waste
from landfill, within 2026, while seeking a short term derogation to allow the PPP
contract to expire.   
Encouraging households to increase use of recycling services to reach at least the
Scottish average (with service exploring options to stretch targets where possible
Housing
Argyll and Bute has a good track record in delivering affordable homes but to
support our drive to grow the population, we need to do more. We will seek to 
increase availability of all types of housing, including affordable homes, by:   
Supporting the provision of over 1,000 affordable homes by 2027 (247 in
2022/23 plus at least 750 additional homes over the life of the Strategic Housing
Investment Plan).   
Exploring additional options to increase the availability of all tenures of housing –
mid market rents, shared equity, affordable by design and other developments – 
in the area.   
Considering the implementation of short term lets control zones to open up more
housing availability. 
Continuing to support households to improve energy efficiency and tackle rising
living costs through annual investment through and implementation of the Home
Energy Efficiency Programme in Argyll and Bute.   
Developing the opportunity for the council to become a Rural Housing Body –
where it would be more directly involved in the delivery of housing or land 
for housing.
Communities
We will build up and strengthen our communities as attractive, vibrant places 
to live, work and do business by:   
Creating area-based plans for all our communities, reflecting investment
opportunities and local service prioritisation.   
Seeking ways of securing more community wealth building opportunities 
across Argyll and Bute and supporting communities to gain maximum benefit 
from developments in their area.   
Seeking to maximise scope for community involvement and participation,
including exploring the role that community transfers can play.  
Corporate Plan | 2023 – 2027 12
Argyll And Bute Council #abplace2b

Page 13

Potential and Growth – turning opportunities into reality
We believe Argyll and Bute has tremendous potential and many opportunities. 
To turn those into reality, we need to make assets work now while we plan for 
and invest in the future. We will do this by:
Economic Development – investing in the future    
Achieving sign-off of the Rural Growth Deal business and cases and begin
delivering priority projects like The Marine Industry Training Centre, UAV Drone
Hub and Seaweed Academy.   
Securing Levelling Up funding for projects, including Argyll and Bute Western
Seaboard Marine Gateways Initiative, targeting the Royal Hotel in Rothesay
and Dunoon’s historic pier; and Connected Argyll and Bute – Whisky Islands; 
and Lorn Economic Growth Zone which targets a package of transport
infrastructure improvements.   
Completing site development of Helensburgh Waterfront project securing 
long-term economic benefit and provision of a public skateboard facility   
Delivering the £15m Campbeltown Flood Prevention Scheme.   
Completing the Ardrishaig Public Realm Project.   
Driving forward additional strategic economic development projects including
progression of the Dunbeg housing, commercial and infrastructure projects 
and the North Lorn Economic Growth Zone through the Lorn Arc TIF scheme.   
Delivering and completing more Conservation Area Regeneration Scheme
(CARS) Projects – in Dunoon, Lochgilphead, Tarbert and Helensburgh.   
Maximising community economic and employment opportunities from the
Islay Scotwind offshore wind project.   
Preparing an options appraisal for implementation of a transient visitor levy.
Commercial Services – making assets work now
Increasing commercial development of business and retail space, including the
Kilmory Industrial Park, and identifying other opportunities wherever possible.   
Exploring additional commercial opportunities at Oban Airport.   
Delivering the Modern Workspace Project, rationalising the council estate 
and facilitating hybrid working solutions.   
Leading the development and creation of Craigendoran Business Park as 
a business, engineering and innovation hub.
Corporate Plan | 2023 – 2027 13
Argyll And Bute Council #abplace2b

Page 14

Exploring opportunities for sharing services where possible – both to help 
grow our income through providing our expertise, and enhancing service 
delivery in communities where we need to source options from elsewhere.   
Driving down further our own carbon emissions, achieving net zero by 2045 
and exceeding our target of a 75% reduction by 2030, building on our good 
track record in relation to combatting climate change, through the delivery 
of our Decarbonisation Plan   
Securing Carbon Literate Organisation status by the end of 2023, including
completion of the rollout of carbon literacy training to all councillors.
Partnership and Action - everyone has a part to play 
in Argyll and Bute’s success
In our Priorities for the Council Term 2022 to 2027, we have set out our areas for
action to deliver our vision for Argyll and Bute. There are elements of that vision
which require action from other agencies at all levels – from our communities
right up to national government. We will commit to working in partnership
wherever we need to as well as calling on others, with responsibility, to take the
action that is required to safeguard Argyll and Bute’s success. This will include:   
Continuing to build up our strong track record in partnership working and seeking
new ways of working with communities, other organisations, and the third and
private sectors.   
Continuing to work in partnership with further education and higher education
providers in Argyll and Bute to ensure young people have access to high quality
innovative educational opportunities that support local employers and the Argyll
economy.   
Lobbying for support for the higher-than-average energy costs faced by Argyll and
Bute communities.   
Pressing the case for retaining delivery of care services locally, where community
knowledge, relationships and experience are best placed to identify and meet
local needs and local accountability.   
Calling for funding support to tackle challenges in local social care delivery –
including recruitment, retention and development of care staff in communities –
rather than centralisation of services.   
Continuing to call for planning, construction and opening of the replacement route
at the Rest and Be Thankful within the life of the this Scottish Parliament
Corporate Plan | 2023 – 2027 14
Argyll And Bute Council #abplace2b

Page 15

Working in partnership with the Rothesay Pavilion Charity Trust to lobby for
funding to complete the refurbishment of the Pavilion.   
Seeking additional funding support to address the unprecedented severe weather
damage to the sea defences supporting Bute’s main island roadway at Ardbeg.   
Working with the Community Planning Partnership to develop a Climate Change
Strategy for the region as a whole.   
Adding our voice to those of our local government colleagues across Scotland
to call on national government for fair funding settlements which enable councils
to deliver the services that matter to communities, and reinforcing the need for
recognition of the vital contribution that local government makes to national
priorities and Scotland’s overall success. 
Corporate Plan | 2023 – 2027 15
Argyll And Bute Council #abplace2b

Page 16

It has been widely recognised that driving change was particularly challenging during 
the period that the public sector was responding to the pandemic. Having returned 
to business as usual, the council needs to adapt the way it operates to meet the 
complex challenges our communities face and changes anticipated in the public sector.
The Council has agreed its vision and priorities and below are the principles by which
officers of the Council will seek to deliver the agreed priorities.
6. Our Principles
1. We are one council, 
one place
working across professional and service
boundaries, collaboratively for the greater good of
the population they serve. Reducing silo working
and increasing joint activity across organisations
and with partners to improve outcomes.
clearly prioritising politically agreed
objectives to achieve the greatest
possible impact with limited
resources, with shared ownership 
of efforts to achieve common goals.
2. We focus on our purpose 
and mission
a consistent approach to
external and self-evaluation
to realise continuous
improvement.
6. We are agile
and adapt to
change
7. We maximise
opportunities that
technology offers
5. We are a learning
council
targeting resources to where
they are most needed and
evaluating the effectiveness
of what we do.
3. Our employees
are empowered
4. We take decisions
informed by data
delegating decisions against
agreed objectives to speed up
decision making and problem
solving, harnessing employees
skills and increasing staff
satisfaction.
Corporate Plan | 2023 – 2027 16
Argyll And Bute Council #abplace2b

Page 17

The Corporate Plan is the overarching plan for the duration of the Council and the detail on how the Council will deliver these priorities
will be illustrated and measured against the Annual Business Plan.
Outcome Indicators; the Council will publish separately an annual report on how it is progressing its outcome indicators.
National Performance Framework; the table below illustrates how the Council priorities are aligned with the NPF.
7.  Measuring our Progress
NATIONAL
PERFORMANCE
FRAMEWORK
Human Rights International Environment Health Fair Work Education
Children Economy Culture Poverty Communities
COUNCIL
PRIORITIES
Equity of specialist
provision in education
estate across Argyll
and Bute.
Recognition of the
vital contribution that
local government
makes to Scotland’s
success.
Work with the
Community Planning
Partnership to
develop a climate
change strategy 
for the region as 
a whole.
Press the case for
retaining delivery of
care services locally.
Ensure young 
people have
access to high
quality innovative
educational
opportunities
that support local
employers and the
Argyll economy.
We will ensure our
schools are effective,
sustainable learning
environments.
We will improve
outcomes for our
children.
We plan for and
invest in the future.
Continue to promote
the teaching and use
of Gaelic.
Lobby for support for
higher than average
energy costs.
We will build up and strengthen our
communities as attractive, vibrant 
places to live, work and do business.
Corporate Plan | 2023 – 2027 17
Argyll And Bute Council #abplace2b

Page 18