ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 29 JUNE 2023
EARMARKED RESERVES – 2022-23 YEAR-END 
1. EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide information on progress with balances already
earmarked within the General Fund and new balances earmarked at the end of 2022-
23 that qualify for automatic carry forward or have been previously agreed. It also
presents proposals to earmark 9 new areas of unspent budget which require
approval.   
1.2 The earmarked balance in the General Fund as at 31 March 2022 was £88.990m.  Of
this £33.893m has been spent during 2022-23 and £1.124m will be transferred back
to the General Fund.  The remainder is planned to be utilised in future years. 
1.3  There are 9 new unspent budget earmarking proposals from services totalling
£4.610m with business cases for approval.  These are noted in Appendix 2.1 and the
associated business cases are in Appendices 2.1a to 2.1i. 
Department Description Appendix £000
Executive Director
Douglas Hendry
Five unspent budget proposals 2.1a to 2.1e 3,060
Executive Director
Kirsty Flanagan
Two unspent budget proposals 2.1f to 2.1g 95
Non Departmental Two unspent budget proposals 2.1h to 2.1i 1,455
Total     4,610 
1.4 There are a further four unspent budget carry forwards totalling £2.094m that have
previously been agreed:
• As part of the 2023-24 budget setting, it was agreed by Council on 23 February
2023 that a saving of £0.340m be made from Planning (reference MGT5).  This
was to be funded from an expected underspend from the 2022-23 outturn. 
• At the Council meeting on 27 February 2020, an allocation of £1.406m for the
Campbeltown Flood Prevention scheme was agreed from the Loans Fund
Review.  This amount is being released to reserves to be utilised in 2023-24. 
• As part of the 2023-24 budget setting, it was agreed by Council on 23 February
2023 that a saving of £0.685m be made from the Loans Fund (reference MGT3). 
This was to be funded from an earmarked reserve already in place of £0.385m
with a further £0.300m being added from the 2022-23 outturn. 
• Earmarking of £0.048m for investment income relating to the Asset Management
Fund.  When the Fund was set up, it was agreed that the income should be added
to it annually and this amount relates to the income for 2022-23.   
1.5 There are new balances totalling £11.708m that qualify for automatic carry forward at
the end of 2022-23.  These include £4.358m of unspent grants including £1.261m

Page 2

from Crown Estates; £2.231m relating to the Strategic Housing Fund; £1.178m of
Scottish Government Initiatives, including 100 day promise and expansion of free
school meals; £1.147m for the Piers and Harbours Investment Fund and £1.130m of
carry forwards for the schools as part of their Devolved Management of Resources
(DMR).    
1.6 The new earmarked balance as at 31 March 2023 amounts to £79.466m.  The most
significant elements of this balance relate to Capital Projects £16.059m, Unspent
Budget £13.566m,  Unspent Grant £13.179m, Strategic Housing Fund £7.247m and
COVID-19 £5.512m. 
1.7 There are historic earmarked reserves in relation to Social Work of £0.054m
contained within this report (£0.040m against Unspent Third Party Contributions and
£0.014m against Scottish Government Initiatives).  For any new reserves, CIPFA
LASAAC Guidance dictates that any reserves relating to the HSCP should be held as
a creditor on the Balance Sheet as money owed to the HSCP from the Council.  It
should be noted that as at 31 March 2023, the balance being held on behalf of the
HSCP in this manner is £5.006m.

Page 3

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 29 JUNE 2023
EARMARKED RESERVES - 2022-23 YEAR-END 
2.  INTRODUCTION 
2.1 The purpose of this report is to provide information on progress with balances already
earmarked within the General Fund and new balances earmarked at the end of 2022-
23 that qualify for automatic carry forward or have been previously agreed. It also
presents proposals to earmark 9 new areas of unspent budget which require
approval.   
3. RECOMMENDATIONS 
3.1 The Council is asked to: 
a) review and approve the revised Policy on Year End Flexibility included as
Appendix 1, including the approval of one new category for automatic carry forward
of unspent income for the installation and maintenance of Electric Vehicle Charging
points. 
b) approve the 9 new unspent budget earmarked reserve proposals totalling £4.610m
as supported by submitted business cases and note that there are a further 4
unspent budget earmarkings amounting to £2.094m that have been previously
approved, as outlined in Appendices 2.1 and 2.2.   
c) note the new balances of £11.708m at the end of 2022-23 that qualify for
automatic carry-forward as outlined in Appendix 3. 
d) note the previously approved earmarked reserves of £61.054m and the
justification for continuing to earmark these as outlined in Appendix 4. 
e) note that £1.124m of no longer required earmarked balances will be released back
into the General Fund. 
f) note that £5.006m relating to Social Work reserves is recognised on the Balance
Sheet and is outwith the scope of this report.

Page 4

4. DETAIL 
4.1 Background 
4.1.1 The Council has previously agreed automatic earmarking of the General Fund in
respect of the following situations: 
• The balances in relation to the Strategic Housing Fund, CHORD and unspent
budget within the Devolved Management of Resources (DMR) Scheme of
Delegation for schools.
• Any unspent grants and unspent contributions from external bodies are
earmarked on the basis that the monies would have to be returned/repaid if
not used for the purpose intended. 
• Any unspent budget that relates to existing policy commitments arising from a
previous Council decision or is required to meet an existing legal commitment
is earmarked.
• Any unspent funding provided by the Scottish Government to implement new
legislation or government initiatives is earmarked. The funding carried forward
is used solely for its intended purpose to fund the implementation of new
government directions.
• Any savings generated from energy efficiency measures are carried forward in
an Energy Efficiency Fund for reinvestment to further reduce the Council’s
energy costs and carbon emission levels.
• The Piers and Harbours Investment Fund – for additional fees and charges
income generated from Piers and Harbours operation the funds will be used to
meet the costs of the prudential borrowing required to develop and maintain
the Council’s harbour assets and infrastructure.
• Hermitage Park - to meet the costs of the 10 year Management and
Maintenance Plan which is a condition of the Heritage Lottery Funding
investment into the Park.
• One Council Property – to invest in the Council’s property portfolio to ensure it
remains fit for purpose.
• Fleet Timing Delay – will be used where an order has been committed to be
spent from revenue budget but supplier issues prevent delivery within the
financial year. 
4.1.2  One new automatic carry forward category, referred to as Electric Vehicle Charging is
proposed.  This will allow earmarking of any surplus from charges to be used for the
installation and maintenance of electric vehicle charging points throughout Argyll. A
revised earmarking policy, including the new category, is attached as Appendix 1 for
approval. 
4.1.3  Outwith the situations noted above there will be no automatic carry forward of
unspent budget.  Earmarking of funds in relation to unspent budget and not covered
by the criteria above are reported to Members for approval and supported by a
business case. 
4.2 New Earmarked Reserves 
4.2.1 Appendix 2.1 provides detail of the new unspent budget proposals from services at
the end of the 2022-23 financial year.  These total £4.610m.  Members are asked to

Page 5

review these new proposed earmarked balances together with the business cases
developed by services which are included as Appendices 2.1a to 2.1i.   
4.2.2 Appendix 2.2 provides detail of the new unspent budget proposals that have
previously been agreed by Council in relation to commitments to specific areas of
spend.  These include a planning saving to be funded from an in-year underspend,
the Capital Programme pressure ‘Campbeltown Flood Prevention’ to be funded from
the Loans Fund, a Loans Fund savings target to be funded from an in-year
underspend and the interest for this year on the Asset Management fund.  These
amount to £2.094m. 
4.2.3  There are new earmarked balances for the 2022-23 financial year which qualify for
automatic carry forward in line with the conditions outlined in paragraphs 4.1.1.  The
new automatic carry forwards amount to £11.708m and are outlined in Appendix 3. 
These include £4.358m of unspent grants including £1.261m from Crown Estates;
£2.231m relating to the Strategic Housing Fund; £1.178m of Scottish Government
Initiatives, including 100 day promise and expansion of free school meals; £1.147m
for the Piers and Harbours Investment Fund and £1.130m of carry forwards for the
schools as part of their Devolved Management of Resources (DMR).  Note that
COVID funding (amounting to £0.517m) is being carried forward under ‘Scottish
Government Initiatives’ but has been allocated its own category of COVID-19 to allow
easier reporting. 
4.3 Previously Approved Balances 
4.3.1 Appendix 4 outlines the previously agreed earmarked balances of £61.054m with a
note on the plans for use and, in some instances, further justification for why the
amounts remain earmarked.   These balances have been scrutinised by SMT to
ensure there are clear spending plans in place and that the purpose of the
earmarking is in line with Council priorities. 
4.3.3 The new earmarking agreed at the Council Budget Meeting on 25 February 2023 is
summarised below: 
• Roads Reconstruction 2023-24 - £3.797m
• Roads Reconstruction 2024-25 - £1.042m
• Footpath improvements - £0.750m
• Capital Plan Gap - £0.725m
• ICT computer replacement - £0.531m
• Engagement with Hub North - £0.100m
• CHARTS - £0.075m
• Mid Argyll Community Pool - £0.030m
• MacTaggart Leisure Islay - £0.030m 
4.4 Balances released back to the General Fund 
4.4.1 The funds totalling £1.124m that will be un-earmarked and released back into the
General Fund are detailed in the paragraphs that follow. 
4.4.2 The balance in the Investment in HubCo of £0.492 is being released to the general
fund as on further review, it is being dealt with as an investment through the Treasury
cash position.

Page 6

4.4.3  In 2020-21 and 2021-22, the Council received allocations for the administration of
Business Support Grants held within the COVID-19 earmarked reserves. The
balance remaining of £0.411m is no longer required for this purpose and is being
released to the General Fund.  
4.4.4 A £0.137m from Investment in Affordable Housing.  This earmarked reserve provides
cash backed reserves for the loans to registered social landlords and the revised
balance of £3.163m reflects the balance on those loans at 31 March 2023. 
4.4.5 The remaining balance of £0.044m on the COVID cost pressures is being released
as it was not required. 
4.4.6 Due to there being no planned expenditure, an earmarking for capital expenditure on
a leased property of £0.025m has been released back to the general fund. 
4.4.7 The last of the redundancy payments in relation to the Kintyre Recycling unspent
budget earmarking have been drawn down so remaining balance of £0.015m can be
released back to the general fund.
4.5 General Fund Balance 
4.5.1 The General Fund balance at 31 March 2022 was £96.081m. Of this £88.990m was
approved by Council to be earmarked for specific purposes. The table at paragraph
4.6 summarises the movement in the earmarked balance to 31 March 2023. 
4.5.2 A total of £79.466m is earmarked to be carried forward into 2023-24.  The most
significant elements of this balance relate to Capital Projects £16.059m, Unspent
Budget £13.566m,Unspent Grant £13.179m, Strategic Housing Fund £7.247m and
COVID-19 £5.512m. 
4.5.3 The earmarked balances will be monitored throughout the financial year and reported
to the Policy and Resources Committee.

Page 7

4.6 Movement in Earmarked Balances 
4.7 Health and Social Care Partnership 
4.7.1 There are historic earmarked reserves in relation to Social Work of £0.054m contained
within this report (£0.040m against Unspent Third Party Contributions and £0.014m
against Scottish Government Initiatives) and can be found in Appendix 4, references
146 and 147.  
Earmarking Category Balance
at 31
March
2022
£000
Transfers
Between
Categories
£000
New
Earmarking
from
2022-23
Outturn
£000
New
Earmarking
Agreed by
Council
during
2022-23
£000
Actual
Spend
2022-23
£000
Released
back to
General
Fund
£000
Balance
Carried
Forward to
2023-24
£000
Strategic Housing Fund 6,590 0 2,231 0 1,574 0 7,247
Investment in Affordable
Housing 3,300 0 0 0 0 137 3,163
Capital Projects 24,722 0 1,406 6,845 16,914 0 16,059
Lochgilphead and
Tarbert Regeneration 2,271 0 0 0 811 0 1,460
Support for Rural Growth
Deal 1,058 0 0 0 302 0 756
Asset Management
Investment 2,607 0 48 0 65 492 2,098
Piers and Harbours
Investment Fund 1,643 0 1,146 0 0 0 2,789
Scottish Government
Initiatives 3,141 0 1,178 0 1,485 0 2,834
CHORD 349 0 29 0 0 0 378
DMR Schools 1,982 0 1,129 0 1,717 0 1,394
Energy Efficiency Fund 218 0 0 0 0 0 218
Existing Legal
Commitments 475 16 0 0 15 0 476
Unspent Grant 12,834 18 4,358 0 4,031 0 13,179
Unspent Third Party
Contribution 166 0 99 0 0 0 265
Previous Council
Decision - Other 4,343 (124) 46 0 432 25 3,808
Redundancy Provision 1,732 0 0 0 154 0 1,578
Supporting
Organisational Change 1,588 0 0 0 162 0 1,426
One Council Property
Team 0 369 197 0 0 0 566
Fleet - Timing Delay 499 0 159 0 0 0 658
Hermitage Park 4 0 15 0 0 0 19
Electric Vehicle
Chargers 0 0 17 0 0 0 17
COVID-19 8,964 (15) 517 0 3,499 455 5,512
Unspent Budget 10,504 (264) 5,838 235 2,732 15 13,566
Totals 88,990 0 18,413 7,080 33,893 1,124 79,466

Page 8

4.7.2 For any new reserves, CIPFA LASAAC Guidance dictates that any reserves relating
to the HSCP should be held as a creditor on the Balance Sheet as money owed to the
HSCP from the Council.  It should be noted that the balance being held on behalf of
the HSCP in this manner is £5.006m.   
5. CONCLUSION 
5.1 A total of £1.124m of earmarked balances will be released back into the General
Fund. 
5.2 Services have submitted their new proposed unspent budget earmarked reserves
balances for the 2022-23 year-end for consideration by Members together with
business cases to support the requests, these proposals total £4.610m.  In addition
there is a further £2.094m unspent budget earmarking previously approved. 
5.3 There are a number of previously approved unspent budget earmarked reserves
balances where there are plans to spend in future years and these have been
scrutinised by SMT to confirm there is clear justification for these to continue to be
earmarked. 
5.4 There are new balances totalling £11.708m that qualify for automatic carry forward
for the Council at the end of 2022-23.   
6. IMPLICATIONS 
6.1  Policy  Outlines the new proposed unspent budget earmarking to be
carried forward as per the updated policy.  Also outlines the
new balances to be earmarked which qualify for automatic
carry forward
6.2 Financial  Outlines all earmarked balances held within the General Fund
6.3 Legal  None
6.4 HR  None
6.5 Fairer Scotland Duty  None
6.5.1 Equalities  None
6.5.2 Socio-Economic Duty  None
6.5.3
6.6
Islands Duty 
Climate Change
None
None
6.7 Risk  None
6.8 Customer Service  None 
Kirsty Flanagan
Executive Director/Section 95 Officer 
Councillor Gary Mulvaney – Policy Lead for Finance and Commercial Services
2 June 2023 
APPENDICES 
Appendix 1 – Policy on End of Year Flexibility
Appendix 2.1 – New Unspent Budget Proposals 2022-23 (New Business Cases)

Page 9

Appendix 2.1a – Business Case – Proposed Clearance and Demolition of Former
Rothesay Academy
Appendix 2.1b – Business Case – Capital Costs for Implementation of ASN Review
Appendix 2.1c – Business Case – Reduction in Teacher Staffing Spend – Strike
Action
Appendix 2.1d – Business Case – MCR Pathways Pilot for Secondary Schools
Appendix 2.1e – Business Case – Principal Teacher for Languages (Gaelic Focus)
Appendix 2.1f – Business Case – Microsoft 365 – Future Licensing
Appendix 2.1g – Business Case – Planning Income
Appendix 2.1h – Business Case – Digital Projects
Appendix 2.1i – Business Case – Contract Inflation Adjustments
Appendix 2.2 – New Unspent Budget Proposals 2022-23 (Previously Agreed)
Appendix 3 – New Automatic Carry Forward Earmarkings 2022-23
Appendix 4 – Previously Agreed Earmarked Balances 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 10

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
1.  INTRODUCTION 
1.1 The Local Authority Accounting Panel (LAAP) Bulletin 99 provides guidance to
local authorities on the establishment and maintenance of local authority
reserves and balances.   
1.2 When reviewing their medium term financial plans and preparing annual
budgets, local authorities should consider the establishment and maintenance
of reserves which can be held for three main purposes:
• A working balance to help cushion the impact of uneven cash flows and
avoid unnecessary temporary borrowing – this forms part of general
reserves;
• A contingency to cushion the impact of unexpected events or
emergencies – this also forms part of general reserves;
• A means of building up funds, often referred to as earmarked reserves,
to meet known or predicted requirements; earmarked reserves are
accounted for separately but remain legally part of the general fund. 
1.3 Given the tightening financial situation it is essential that the Council gives
proper scrutiny to any proposal to earmark balances or carry forward funds. In
particular the Council should seek to ensure funding that is carried forward is
directed to and supports Council priorities in terms of corporate and service
plans.     
1.4 This note outlines the policy adopted by the Council for the earmarking and
carry forward of surplus funds to future years. 
2. POLICY 
2.1 SMT agreed the twelve situations where earmarking of the general fund reserve
is permitted. 
2.2 SMT agreed the protocol for use of reserves. 
3. DETAIL 
3.1 The Council hold a general fund reserve.  It comprises the following elements:
• A contingency for any unforeseen events or emergencies.  The
contingency is reviewed each year as part of the budget process. 
• The Strategic Housing Fund.
• Balances held to support the following year’s budget.
• Earmarked funds as noted below.

Page 11

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
3.2 At the end of each financial year any surplus for the year is added to the general
fund reserve.  At this time the Council have the opportunity to consider
earmarking surplus funds. 
3.3 There are twelve situations where earmarking of the general fund reserve is
permitted. 
• Unspent grant.  On some occasions a grant is received in one financial
year and will not be spent/fully spent until the following financial year.  If
the grant is not spent on the purpose intended the Council would have
to return the unspent grant, therefore, the unspent grant is required to
be held in the general fund and earmarked for that purpose next year. 
• Unspent third party contribution.  The council may receive a contribution
from third parties towards a project/work stream but the project spans
more than one financial year.  As with grant payments the contribution
would have to be repaid if not spent on the purpose it was intended for. 
In this instance, the unspent contribution is required to be held in the
general fund and earmarked for that purpose next year. 
• Unspent budget within the Devolved Management of Resources (DMR)
Scheme of Delegation for schools.   This allows for the carry forward of
unspent budget within schools, partly to give flexibility over the school
year as opposed to the Council’s financial year.  Unspent budget is
required to be held in the general fund and earmarked for the school
next year.  This carry forward operates within the agreed scheme of
delegation for school budgets. 
• CHORD funding.  Any budget allocated to the CHORD programme will
be ring fenced and any unspent balance at the year-end will be carried
forward to support the overall CHORD programme. 
• Existing Legal Commitments. 
• Scottish Government Initiatives. The council may receive additional
funding from the Scottish Government to implement new Government
initiatives or legislation. Any unspent funding at year end will be held in
the general fund and earmarked for that purpose next year. 
• Energy Efficiency Fund. Any savings generated from energy efficiency
measures are to be pooled for reinvestment in additional projects which
further reduce the Council’s energy costs and carbon emission levels.

Page 12

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
• Piers and Harbours Investment Fund. Additional fees and charges
income generated from Piers and Harbours operations are to be pooled
and used to meet the costs of the prudential borrowing required to
develop and maintain the Council’s harbour assets and infrastructure. 
• Hermitage Park.  The Hermitage Park regeneration project has a
significant investment from the Heritage Lottery Fund (HLF) which has
a requirement to have a 10 year Management and Maintenance Plan. 
This will be partly funded by existing Council revenue budgets but should
also be supplemented by any additional income which can be generated
from park activities.  Part of the HLF conditions are that all income
generated by the park should be retained to support the Management
and Maintenance Plan and a result of this requirement, any unspent
income generated by the park is retained for future years requirements. 
• One Council Property Team.  The corporate approach to managing
property has been in place since 2018 and historically any surplus above
budget will have been absorbed by the Service and ultimately gone to
the general fund.  This ring-fenced fund for One Council Property will
enable investment in the Council’s property portfolio to ensure it remains
fit for purpose. 
• Fleet - Timing Delay.  In 2020-21 year, there was a particular problem
with orders not being delivered because of manufacturing issues due to
the COVID-19 pandemic. This earmarking allows the value of fleet
orders submitted but not delivered due to supplier issues to be
automatically earmarked to offset the invoice when the order is received. 
• Electric Vehicle Charging Surplus – the fee was set in order to create a
surplus in order to allow future investment in charging points.  A new
automatic earmarking category is proposed to allow future electronic
vehicle charging points to be installed and maintained. 
3.4 Outwith these twelve situations noted above there will be no automatic carry
forward of unspent budget.  Any surplus arising from unspent budget within
departments/services will be pooled and transferred into the general fund
reserve. 
4. PROTOCOL FOR USE OF RESERVES 
4.1 There are exceptional circumstances where a proposal to earmark unspent
budget may be considered.  There is no set timetable for this.   
• The Council’s level of general reserve contingency must be fully met.

Page 13

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
• The purpose for the earmarking must be linked to the objectives,
priorities and targets as set out in the Council’s Corporate Plan, Area
Plans and Service Plans. 
• There needs to be a business case that justifies the required
expenditure. 
• Consideration of the business case must take account of the future
budgetary and financial outlook in order not to place undue financial
pressure on the Council in the future. 
4.2 Any requests to earmark unspent budget based on the criteria above must be
submitted to the SMT in the first instance.  SMT would assess the proposal and
if it considers the proposal worthy of support would submit it to the Council with
a recommendation.  Proposals not supported by SMT will proceed no further. 
Kirsty Flanagan
Executive Director /Section 95 Officer
1 June 2023

Page 14

Appendix 2.1
With Business Cases
Ref Service Description New Earmarking Reason for Carry
Forward
Plans for Use Amount Planned
to be Spent in
2023/24
Amount Planned
to be Spent in
2024/25
Amount Planned
to be Spent from
2025/26 onwards
EXECUTIVE DIRECTOR (DOUGLAS HENDRY)
001
Commercial Services Rothesay Academy - Demolition and
Waste Disposal
895,000 Unspent Budget Since Rothesay Academy was vacated over 15 years ago no site clearance has taken
place and there are potential Health and Safety and insurance cover implications due to
deterioration of the building. £55,000 earmarking will allow clearance of remaining
materials and debris.
Also £840,000 to fund estimated future costs of demolition (subject to removal of listed
status) tobeadded toanexisting earmarking. Therearepotential Health and Safetyand
insurance cover implications due to deterioration of the building.
55,000 840,000 0
002
Education ASN Review 1,255,000 Unspent Budget To fund capital costs of ASN adaptations as part of ASN Review to increase equity of
provision across Argyll and Bute. This will be subject to a business case as part of the
wider ASN review.
0 1,255,000 0
003 Education Reduced Teacher Staffing Costs -
Strike Action
800,000 Unspent Budget To fund one off savings in 2024-25 from the underspend in staffing from strike action. 0 800,000 0
004
Education MCR Pathways Pilot 80,000 Unspent Budget Funding to support implementation of MCR Pathways mentoring programme within
three secondary schools for 2023-24 academic year. Funding will allow the employment
of a dedicated Co-ordinator within each setting to develop and implement the
programme which is designed to benefit care experienced and other disadvantaged
pupils through targeted mentoring support.
50,000 30,000 0
005
Education Gaelic Specific Grant 30,000 Unspent Budget Proposal to fund the continuation of the Principal Teacher Languages (Gaelic focus) post
forthe2023-24 academicyeartopromote anddevelop GaelicMedium Educationacross
Argyll and Bute. This earmarking refers to the Council contribution towards the Gaelic
grant for 22-23.
13,000 17,000 0
EXECUTIVE DIRECTOR (KIRSTY FLANGAN)
006 Customer Support Services Microsoft365 35,000 Unspent Budget To be added to existing earmarked reserves to meet increasing MS365 licensing costs
from 2023/24 onwards
0 0 35,000
007 Development & Economic Growth Planning Income 60,000 Unspent Budget To fund additional resources to support and develop the Council's planning service. 60,000 0 0
NON DEPARTMENTAL
008
Across Services Digital Projects 840,000 Unspent Budget To deliver a number of Digital Projects, specifically in Education, Legal and Regulatory
Support and Customer Support Services. The specific projects are: the ITrent Project,
School WiFi upgrades £0.200m, Replacement of Council Chambers online meeting
equipment £0.130m, a Digital Project Officer £0.060m, Resilient Website Project
£0.060m, Cashless Catering £0.030m and a Digital Engagement Services Developer
£0.028m.
605,000 235,000 0
009
Across Services Contract Inflation Adjustments 614,523 Unspent Budget To fund inflation pressures affecting three areas of contracted spend within the Council:
£350,000 for the NPDO and DBFM Schools Contract Unitary Charge, £255,000 for the
Waste PPP contract and £0.010m for the MAKI and Islay Pools Service Level Agreement.
614,523 0 0
4,609,523 1,397,523 3,177,000 35,000
NEW Unspent Budget Proposals - 2022-23 Year End
Spending profile

Page 15

Appendix 2.1a 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
EXECUTIVE DIRECTOR DOUGLAS HENDRY 29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
PROPOSED CLEARANCE AND DEMOLITION OF FORMER ROTHESAY ACADEMY
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that an additional £840,000 be earmarked from the revenue budget
underspend to fund the future demolition costs of the former Rothesay Academy
(subject to the listing being removed). It is important to note that this allocation in no
way prejudges the outcome of the process to remove the listing from the property but
only makes provision in the event that this outcome is achieved.  It is also proposed to
earmark £55,000 to fund the removal of materials from the former Rothesay Academy
site.   
2.2 
2.2.1 
2.2.2 
2.2.3 
2.2.4 
Business Case – Demolition Costs 
In the 2020-21 budget £250,000 was earmarked for the demolition of Lochgilphead
Primary School with any remaining funds to be used for early investigations into the
proposed demolition of Rothesay Academy (subject to the listing being removed). 
Lochgilphead Primary has now been demolished and additional budget is required to
move to stage 2 of the project. 
The former Rothesay Academy site was vacated over 15 years ago and has not been
used productively since then. The property has understandably deteriorated over this
period. 
Despite Estates marketing Rothesay Academy for sale over a number of years no
viable proposals have been received due to the costs of demolition / conversion. 
Rothesay Academy has become a source of concern for the Property team, local
Police and the council’s Insurers in terms of vandalism, anti-social behaviour,
maintenance costs and ongoing repairs to keep the property secure. There is also a
danger of youths gaining access and injuring themselves.

Page 16

Appendix 2.1a 
2.2.5 
2.2.6 
The property is a listed building and therefore any proposals will be subject to
consultation with Historic Environment Scotland to remove or vary the listing to allow
the property, or part of, to be demolished. During 2021, Fyne Homes demolished the
upper part of the former Academy which they own, but was not listed. Both the
council and Fyne Homes are keen to see the overall site regenerated holistically
which the demolition of the lower academy building will facilitate. 
Initial assessment of the costs of demolition for Rothesay Academy, based on the
cost of demolishing the former Lochgilphead Primary School, are around £900k -
£1m.The identified sum of £840,000 will be required to meet these obligations
however there may also be opportunities to seek external funding to meet part of the
costs.  
2.3  Business Case – Disposal of Materials
2.3.1 The former Rothesay Academy was vacated over 15 years ago following the
development of the new campus. The property has significantly deteriorated in the
intervening period. 
2.3.2 The buildings were not cleared of school materials when the property was vacated
and as the property has deteriorated this has become a fire risk. This was also
highlighted by the council’s Insurers and therefore requires to be addressed. 
2.3.3 Contractors were instructed to provide a cost estimate for the removal of the
materials and the lowest quote received was in the region of £53,500. The identified
sum of £55,000 will be required to meet future obligations. 
2.4 
2.4.1
Expenditure Profile 
The sum of £895,000 will be spent from 2023-24 onwards subject to the removal of the
listing on the property. 
EXECUTIVE DIRECTOR DOUGLAS HENDRY
WITH RESPONSIBILITY FOR COMMERCIAL SERVICES

Page 17

Appendix 2.1b 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
EXECUTIVE DIRECTOR DOUGLAS HENDRY 29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE 
CAPITAL COSTS FOR IMPLEMENTATION OF ASN REVIEW 
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £1,255,000 be earmarked from the revenue budget underspend to
fund capital costs for adaptations required for the implementation of actions from the
ASN review 2023.  
2.2 
2.2.1 
2.2.2 
2.2.3 
Business Case 
The ASN review identified an inequality of provision of Learning Centre facilities
across the geographical areas within Argyll and Bute. 
In order to address this inequality of provision four Learning Centres should be
developed within local education establishments across Argyll and Bute. 
A secondary Learning Centre should be established in the Helensburgh and Lomond
area.  A primary Learning Centre should be established in the Kintyre area.  In
addition to this multi – sector Learning Centres should be established on the Isles of
Mull and Islay.  
2.3 
2.3.1
Expenditure Profile 
The sum of £1,255,000 will be spent from 2023-24 onwards on adaptations required
to establish four further Learning Centre provisions. 
EXECUTIVE DIRECTOR DOUGLAS HENDRY
WITH RESPONSIBILITY FOR EDUCATION

Page 18

Appendix 2.1c 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
REPORT BY EXECUTIVE DIRECTOR DOUGLAS HENDRY 29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
REDUCTION IN TEACHER STAFFING SPEND - STRIKE ACTION
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £800,000 be earmarked from the revenue budget underspend within
the Education Service in 2022-23 to fund one off budget savings in 2024-25.  
2.2 
2.2.1 
2.2.2 
2.2.3 
Business Case 
In 2022-23 there was a reduction in staffing costs due to industrial action which
impacted on the salary costs and related expenditure by the Education Service
resulting in an underspend of £800,000.   
We propose to earmark this underspend to use as a one-off saving within the 2024-
25 budget. 
This would allow the service to make a significant saving without impacting on the
quality of Education provision.  
2.3  Expenditure Profile 
The sum of £800,000 will be utilised in 2024-25. 
EXECUTIVE DIRECTOR DOUGLAS HENDRY
WITH RESPONSIBILITY FOR EDUCATION

Page 19

Appendix 2.1d 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
EXECUTIVE DIRECTOR DOUGLAS HENDRY 29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
MCR PATHWAYS PILOT FOR SECONDARY SCHOOLS
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £80,000 be earmarked from the revenue budget underspend to
support funding of the MCR Pathways Programme pilot in three secondary schools –
Oban High School, Dunoon Grammar School and Hermitage Academy.  
2.2 
2.2.1 
2.2.2 
2.2.3 
2.2.4 
Business Case 
MCR Pathways is a third-sector national mentoring programme currently operating in
19 Scottish local authorities. 
In introducing the mentoring programme in Argyll and Bute, MCR Pathways would
work in partnership with the council to employ volunteer mentors from the local
community to work closely with vulnerable pupils in S3-S6 at secondary school. 
The programme would principally target Care Experienced young people, as well as
other young people who experience obstacles or challenges in attaining and
achieving their potential.  Through regular work with a trained mentor, each young
person would be supported in building the confidence, life skills and contacts to
support them in achieving and attaining to their full potential in school, and in entering
a sustained positive destination post-school.  Across the country, data demonstrates
the extremely positive impact of MCR Pathways on the lives and prospects of those
young people engaging with the programme. 
The programme also provides taster sessions of the world of work and training for
mentees, and group support for identified pupils in S1 and S2, in preparation for
mentoring in S3 and beyond.

Page 20

Appendix 2.1d 
2.2.5 
2.2.6 
A key aspect of establishing the MCR Pathways programme in Argyll and Bute is the
recruitment of a Pathways Co-ordinator for each school.  The Pathways Co-ordinator
plays a key role in the recruitment of mentors for each school, is central to
appropriately matching mentors to individual pupils, organises and co-ordinates the
taster sessions for mentees and group sessions for S1-S2 pupils, and is a key
support for young people accessing the MCR Pathways programme. 
The annual cost to the local authority for each Pathways Co-ordinator, including on-
costs, is around £34,000.  Schools are being asked to contribute to the funding
through their Pupil Equity Funding.  The requested earmarked funds are intended to
supplement schools’ contributions in order to ensure the viability of the project.  
2.3 
2.3.1
Expenditure Profile 
The funds would be profiled across August – March 23-24 and April – June 24-25,
covering next academic session, to enable the recruitment of a Pathways Co-
ordinator for each of the above-mentioned schools.   
EXECUTIVE DIRECTOR DOUGLAS HENDRY
WITH RESPONSIBILITY FOR EDUCATION

Page 21

Appendix 2.1e 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
EXECUTIVE DIRECTOR DOUGLAS HENDRY 29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL RESERVE
PRINCIPAL TEACHER FOR LANGUAGES (GAELIC FOCUS)
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 
2.2 
2.2.1 
2.2.2 
2.2.3 
2.2.4 
It is proposed that £30,000 is earmarked from the revenue budget underspend in order
to support the extension of the Principal Teacher for Languages (Gaelic focus) post
to enable continuing support around Gaelic language. 
Business Case 
Working with the BGE Team, the Principal Teacher has already led extensive work
on 1+2 Languages. Her work has also included Gaelic support and we have
recognised this as an area where there continues to be a level of need. 
The Principal Teacher’s current contract ends in August 2023. There are a number of
pieces of work underway which will have to be paused if there is nobody fulfilling this
post. 
At present, the Principal Teacher is responsible for organising and delivering CLPL
opportunities for staff, working with the Education Officer to promote Gaelic usage
across the authority and works with colleagues to promote the expansion of Gaelic
across Argyll and Bute establishments. 
Retaining the current Principal Teacher in post would ensure that we continue to
promote the consistency, availability and status of Gaelic throughout the authority by
raising the profile of the language and ensuring that schools have the capacity to
deliver consistently high quality experiences for Gaelic Learners and pupils in Gaelic
Medium Education (GME).

Page 22

Appendix 2.1e 
2.3 
2.3.1 
2.3.2 
2.3.3 
2.3.4 
2.4 
2.4.1 
Proposed Plan 
The continuation of this post would enable the Principal Teacher, who has developed
significant skill and expertise in this area, to continue to support the promotion,
development and expansion of GME through working with establishments to promote
the high quality experiences on offer within our GME provision and to ensure that
GLE is consistently engaging, meaningful and interesting for pupils. They will play a
key role in ensuring continuous improvement of our existing GME and GLE provision
with the ultimate aim of increasing numbers of pupils. 
The Principal Teacher will continue to promote Gaelic usage across the authority
and build capacity across establishments to ensure that staff feel confident in
delivering high quality Gaelic language and culture activities. The Principal Teacher
will support schools to make connections within their community to promote Gaelic
language and access links across the wider community. 
The Principal Teacher will continue to promote Gaelic across the authority in order to
raise the profile of the language within our communities. They will support
establishments to ensure consistency and equity of experience for all. The Principal
Teacher will ensure that specific support is targeted towards schools in areas of higher
deprivation in order to ensure that barriers to learning about Gaelic language and
culture are removed 
The Principal Teacher will play a lead role in strengthening Gaelic skills across
Argyll and Bute. They will be responsible for raising awareness of Gaelic and Gaelic
opportunities in our communities for parents/carers and families. They will work with
other Council colleagues including the Gaelic Development Officer to ensure a
cohesive approach to Gaelic across our authority and to ensure that all opportunities
are highlighted and maximised. 
Expenditure Profile 
The funds would be profiled across August – March 23-24 and April – June 24-25,
covering next academic session, for the extension of the contract for the Principal
Teacher currently in post (0.8fte). 
EXECUTIVE DIRECTOR DOUGLAS HENDRY
WITH RESPONSIBILITY FOR EDUCATION

Page 23

Appendix 2.1f 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
REPORT BY EXECUTIVE DIRECTOR KIRSTY FLANAGAN 29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
MICROSOFT 365 – FUTURE LICENSING
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £35,000 be earmarked from the revenue budget underspend within
ICT in 2022-23 and added to existing earmarked reserves to meet increasing MS365
licensing costs from 2023-24 onwards.  
2.2 
2.2.1 
2.2.2
Business Case 
The ICT Service first reported the need to set aside funds to pay increased costs for
Microsoft licences in 2017/18. Since then, ICT have contributed to an earmarking
reserve each year as the council prepared to move from an on-premise “owned
outright” licence model to a subscription based model using MS365. 
The project to migrate to MS365 was originally scheduled to complete during the
2021/22 financial year, during which the council expected to pay the higher licensing
costs. Delays to the project in 2021/22 resulted in higher costs not being experienced
until 2022/23 onwards. This provided opportunities to add further to the earmarked
reserves in 2021/22 and retain that balance in 2022/23, extending the expenditure
profile to ensure the Microsoft cost pressure does not impact the council’s revenue
budget until 2026/27 – 2 years later than originally predicted.  
2.3 
2.3.1 
Expenditure Profile 
The sum of £35,000 will be spent from 2023-24 onwards. 
EXECUTIVE DIRECTOR KIRSTY FLANAGAN
WITH RESPONSIBILITY FOR CUSTOMER SUPPORT SERVICES

Page 24

Appendix 2.1g 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
REPORT BY EXECUTIVE DIRECTOR KIRSTY FLANAGAN 29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
PLANNING INCOME
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £60,000 be earmarked from the revenue budget underspend within
Planning Services in 2022-23 to fund resources to support the development and
workload of the service.  
2.2 
2.2.1 
Business Case 
Additional income has been received for Major Planning Applications during financial
year 2022-23 which have been surplus to requirements.  Additional income is
expected again in 2023-24.  Proposals have been drawn up to use this additional
planning application income to fund additional resources to support and develop the
service.  This £60k earmarking would fund additional costs for the Team Leaders,
Senior Planners and a new Technical Officer post.  
2.3 
2.3.1
Expenditure Profile 
The sum of £60,000 will be spent from 2023/24 onwards. 
EXECUTIVE DIRECTOR KIRSTY FLANGAN
WITH RESPONSIBILITY FOR DEVELOPMENT AND ECONOMIC GROWTH

Page 25

Appendix 2.1h 
ARGYLL AND BUTE COUNCIL COUNCIL
REPORT BY EXECUTIVE DIRECTORS DOUGLAS HENDRY
AND KIRSTY FLANAGAN
29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
DIGITAL PROJECTS
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1  It is proposed that £840,000 be earmarked from the revenue budget underspend to
deliver a number of Digital Projects, specifically in Commercial Services, Education,
Legal and Regulatory Support and Customer Support Services.   
2.2  Business Case 
Digital improvements are an essential route to ensuring that the Council continues to
improve service delivery in the face of ever increasing financial pressures. The ICT
and Digital Strategy sets out the Council’s Digital ambitions and aspirations, but not
all of these aspirations are funded. This Business Case identifies six specific Digital
Projects, which support delivery of our digital ambitions and are set out below. 
2.2.1 Improvements and Expansion of School WIFI coverage 
It is proposed that £200,000 be earmarked to fund improvements and the expansion
of school Wi-Fi coverage for learning and teaching areas.   
All classrooms and many common areas such as multipurpose games halls are fully
covered by Wi-Fi. However, ongoing feedback from some schools indicates that there
are other areas in schools where additional Wi-Fi coverage may be beneficial to the
learning experience.   
The earmarking will support an increased number of Wi-Fi access points, upgrades
to networking equipment and structured cabling, necessary to support an increased
number of wireless access points and improve the performance and reliability of the
network.   
Schools are required to cover the initial cost of any additional Wi-Fi access points at a
cost of £400 (each) to provide wireless internet access in areas where there is no
existing coverage, or to enable the flexible use of other areas of the school for learning

Page 26

Appendix 2.1h 
and teaching such as dining halls, games halls, schoolhouses and some outdoor
spaces. 
Expenditure Profile 
Market lead times for delivery of networking equipment have increased significantly
due to supply constraints and other current global market factors, and long
procurement lead times are expected. 
ICT Networks resource is committed to major projects for much of this calendar year.
Consequently, the sum of £200,000 will be spent from 2023/24 onwards and will roll
into 2024/2025. 
2.2.2 Cashless Catering 
It is proposed that £30,000 be earmarked to provide additional funding for the ongoing
Cashless Catering Online Payments in schools project. 
The project is introducing electronic payments for school meals and other items such
as uniforms and trips for both primary and secondary schools 
Due to issues that have arisen during the testing process for the secondary school
cashless catering system and interfaces with other systems, there has been some
slippage in implementation timescales. Costs are still being incurred for the existing
solution whilst the new solution is being rolled out on a school by school basis. 
The proposed earmarking will allow for the overlap of costs between new and existing
solutions and additional reports/testing as required until the system is fully
implemented.   
Expenditure Profile 
The sum of £30,000 will be spent during 2023-24. 
2.2.3 Council Chambers Equipment 
It is proposed that £130,000 be earmarked to fund the replacement of the Council
Chamber Online Meeting Equipment. 
The Council has fully adopted online and hybrid committee meetings as part of our
move to digital. This requires effective and efficient ICT equipment. We are entering
the final year of maintenance for the current Council Chamber Online Meeting
Equipment and there have been ongoing issues with reliability. A condition
assessment by the incumbent maintenance contractor has highlighted that the
current equipment is now at end of life and unsupportable due to obsolescence. 
Discussions with ICT have taken place and estimated replacement costs could be in
the region of £125,000 - £130,000. It is proposed that £130,000 be earmarked to meet

Page 27

Appendix 2.1h 
this cost as the equipment is vital to maintaining the ongoing availability of Hybrid
Meetings.   
Expenditure Profile 
The sum of £130,000 will be spent from 2023/24 onwards. 
2.2.4  iTrent Project 
It is proposed that £332,000 is earmarked to support the implementation of the new
iTrent HR and Payroll system. 
The Council will shortly commence work to implement the new iTrent HR and Payroll
System to replace ResourceLink which goes out of contract at the end of September
2024. 
This earmarking will ensure that sufficient backfill is in place to support the payroll
and HR teams to continue to deliver the essential business as usual activities
associated with recruiting, managing and paying employees in addition to supporting
the development, testing and implementation of the new software. It will also ensure
that sufficient resource is available to fund existing and new software contracts, the
licencing costs of which will overlap, and running concurrent payrolls until the new
system is fully tested and high assurance is in place that accurate and compliant
payroll processing is in place. 
The iTrent system is planned to go live by the end of June 2024 and additional
staffing resource is needed in the Payroll Team to undertake the implementation
work involved. This will involve: process redesign, system configuration and testing,
user training, parallel running of the old and new systems for 2 months to identify and
resolve any issues and 3 months of support after the go live date to support system
users across the Council. 
The payroll system is a critical line of business system which affects all of the Council’s
departments. Errors within the system directly and adversely impact staff and
members. It is therefore essential that the Payroll Team have the resources required
to ensure that the new system is configured correctly and robustly tested so that it is
fit for purpose when it goes live in 2024. 
Expenditure Profile 
The sum of £332,000 will be spent in 2023-24 and 2024-25 
2.2.5 Digital Project Officer HROD 
It is proposed that £60,000 be earmarked to fund a temporary Digital Project Officer in
HROD for 1 year to implement the improvements identified by the Digital Skills Survey,
Data Maturity Assessment and MS365 skills improvements. 
HROD aim to maximise opportunities that technology offers in the services that they
provide to employees and managers. To deliver this successfully, it will be essential

Page 28

Appendix 2.1h 
to develop and implement an action plan that takes forward the findings from the
Digital Skills Survey, Data Maturity Assessment and maximise the impact of the
MS365 implementation to Council business through the AB365 programme. The
temporary Project Officer will develop and deliver an action plan to improve these
agreed outcomes. 
Expenditure Profile 
The sum of £60,000 will be spent over 2023-24 and 2024-25. 
2.2.6 Resilient Website Project 
It is proposed that £60,000 be earmarked to fund a resilient website project to move to
a cloud based website platform. 
Our current website is based on our own Council IT servers. This means that there is
no automatic way to manage any failure and in the event of an ‘on premise’ cyber-
attack (an attack on our in-house servers) that takes the website down, we would not
be able to continue with any payments or other interactions with customers. These
digital transactions amount to in excess of £1m per annum and provide an important
and convenient service for customers as well as being highly efficient. We would
have to revert to manual payments. 
We would be able to use the MyCouncilWorks or Invest in Argyll websites, but only
for posting information as these are cloud based sites and therefore resilient. 
A cloud based website would provide us with a secure, resilient way to ensure that all
of our digital, web based customer activities and payments could be protected from a
cyber-attack to our systems. 
The Resilient Website Project was highlighted as an area for action during a
cybersecurity review following the cyber security exercise on business continuity in
2022. 
This project will facilitate a move to a cloud based, managed website platform with
dual centre failover. 
Expenditure Profile 
The sum of £60,000 will be spent in 2023-24 and 2024-25. 
2.2.7 Digital Engagement Service Developer 
It is proposed that £28,000 be earmarked to part fund a Digital Engagement Services
Developer. 
The Customer Engagement Team has invested in software called CREATE/RPA
which enables robotic processes to be built and applied to council business activities.
To use this software, which has significant capacity to improve processing times and
efficiencies, we need to have staff with the skills to programme it.

Page 29

Appendix 2.1h 
At the moment the software is being underused as it has more capacity than we have
employees to programme it. This means that we are unable to progress with all of the
service requests that we have received and our lack of capacity is limiting digital
improvements. 
A Digital Engagement Services Developer post working in the Digital Service Team
would increase our capacity to work through the Use Case List for the new
CREATE/RPA system. 
Part of the post can be funded through a current vacancy.  The post will be temporary
for 18 months. 
Expenditure Profile 
The sum of £28,000 will be spent in 2023-24 and 2024/25. 
3 Summary 
Service Description New Earmarking
Education School WiFi Upgrades 200,000 
Education Cashless Catering 30,000
Legal and Regulatory
Support 
Replacement of Council
Chambers Online Meeting
Equipment
130,000 
Customer Support
Services
iTrent Project 332,000 
Customer Support
Services
Digital Project Officer 60,000 
Customer Support
Services
Resilient Website Project  60,000 
Customer Support
Services
Digital Engagement Services
Developer 
28,000 
840,000 
DOUGLAS HENDRY AND KIRSTY FLANAGAN
EXECUTIVE DIRECTORS

Page 30

Appendix 2.1i 
Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
REPORT BY EXECUTIVE DIRECTORS DOUGLAS HENDRY
AND KIRSTY FLANAGAN
29 JUNE 2023
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
CONTRACT INFLATION ADJUSTMENTS
1. INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £614,523 be earmarked from the revenue budget underspend in
2022-23 to fund inflation cost pressures affecting three areas of contracted spend in
the Council.  
2.2 
2.2.1 
2.2.2 
2.2.3 
Business Case 
In setting the annual budget, an allowance for non-pay inflation is included based on
estimates of the inflation rates which affect the costs of the Council’s external
contracts. In setting the 2023/24 budget for the three contracts below, the inflation
estimates included in the budget were lower than inflation turned out to be in
February 2023, which is the inflation reporting month used to set the inflation uplift for
the following financial year and which is not available until after the Council sets its
budget. 
To align the budgets with the impact of the difference between the inflation estimates
and the actual inflation rate, budget adjustments totalling £614,523 are proposed for
the three contracts detailed below. 
NPDO & DBFM Schools Contract Unitary Charge 
The non-pay inflation element utilised for the 2023-24 budget was based on an
anticipated RPI inflation increase of 8.18%. The actual RPI year on year inflation at
February 2023 was 13.8% which has resulted in a shortfall of £480,215. It is
proposed that £350,000 be earmarked to meet the shortfall with the balance being
met from one-off efficiency monies.

Page 31

Appendix 2.1i 
2.2.4 
2.2.5 
2.2.6
Waste PPP Contract 
The non-pay inflation element utilised for the 2023/24 budget was based on an
anticipated RPIX inflation increase of 7.09%. The actual RPIX year on year inflation
at February 2023 was 10.98% which has resulted in a shortfall of £255,000. It is
proposed that £255,000 be earmarked to meet the shortfall. 
MAKI and Islay Pools Service Level Agreement 
The non-pay inflation element utilised for the 2023-24 budget for the Leisure SLA for
MAKI/Islay Pools was based on an anticipated RPI inflation increase of 8.18%. The
actual RPI year on year inflation at February 2023 was 13.8% which has resulted in a
shortfall of £9,523. It is proposed that £9,523 be earmarked to meet the shortfall. 
Adjustments have been included in the draft budget for 2024/25 to align the base
budget with the actual inflation rate increases detailed above and measures have
been put in place to improve the accuracy of the inflation estimates for February
2024.  
2.3 
2.3.1
Expenditure Profile 
The sum of £614,523 will be spent during 2023/24. 
DOUGLAS HENDRY AND KIRSTY FLANAGAN
EXECUTIVE DIRECTORS

Page 32

Appendix 2.2
Previously agreed
Ref Service Description New
Earmarking
£
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
EXECUTIVE DIRECTOR KIRSTY FLANAGAN
001 Development & Economic Growth Planning Income 340,000 Unspent Budget To fund one off operational saving MGT5 agreed for the 2023/24 budget 340,000 0 0
NON DEPARTMENTAL
002 Non Departmental Campbeltown Flood Prevention 1,406,000 Unspent Budget Funding agreed as part of the Loans Fund Review for Campbeltown Flood Prevention.  1,406,000 0 0
003 Non Departmental Loans Fund 300,000 Unspent Budget To fund one off operational saving MGT3 agreed for the 2023/24 budget 300,000 0 0
004 Non Departmental Asset Management Fund 48,173 Unspent Budget
Investment income relating to the Asset Management Fund. When the Fund was set up,
it was agreed that the income should be added to it annually. The amount being
earmarked relates to income from 2021-22
0 0 48,173
2,094,173 2,046,000 0 48,173
NEW Unspent Budget Proposals - 2022-23 Year End
Spending profile

Page 33

Appendix 3.1
Ref Service Description New
Earmarking £
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
CHIEF EXECUTIVES UNIT
001 Community Planning NHS Highland Contribution Towards the CPP Running Costs 42,770 Unspent Third Party
Contribution
Will be deployed as required in the day-to-day running of the Community Planning
Partnership's operations. 42,770 0 0
002 Community Planning Gaelic Development 11,519 Unspent Grant To fund Gaelic specific work and project work of the Community Planning Partnership
including the development of the new 10 year Outcome Improvement Plan 11,519 0 0
003 Community Planning Recovered unspent third sector grant funding. 10,846 Previous Council
Decision
To be distributed through the Supporting Communities Fund for communities based
projects across Argyll and Bute. 10,846 0 0
004 Community Planning Covid impacts – support to communities’ 5,100 COVID-19 Funding provided in relation to the Local Self-Isolation Assistance Service. 5,100 0 0
EXECTIVE DIRECTOR (DOUGLAS HENDRY)
005 Commercial One Council Property 197,338 One Council Property
Team
It was agreed in 2020/21 to retain revenue generated from commercial activity in One
Council Property for future investment across the Council’s property portfolio to ensure
it remains fit for purpose.
197,338 0 0
006 Education DSM - Devolved School Management Scheme 1,129,677 DMR Schools To be spent in accordance with DSM regulations. 1,129,677 0 0
007 Education 100 Day Promise - Increase Teacher and Pupil Support Assistant
Numbers 713,292 Scottish Government
Initiatives
Scottish Government initiative to increase the number of teachers and support assistants
in schools. 713,292 0 0
008 Education Pupil Equity Fund Carry Forward 565,097 Unspent Grant
To provide targeted support for children and young people affected by poverty to
achieve their full potential.  Funding is used over the academic year. 565,097 0 0
009 Education Expansion of Universal Free School Meals 451,208 Scottish Government
Initiatives
To support the continued phased implementation of Universal Free School Meals for
Primary children. 451,208 0 0
010 Education Early Learning and Childcare - 1140 Hours (2022/23) 471,340 Unspent Grant
Continued provision of high quality early learning and childcare experiences to children
eligible for 1140 hours, in accordance with Funding Follows the Child and the associated
National Standard.
471,340 0 0
011 Education Scottish Milk and Healthy Snack Scheme (SMHSS) 43,470 Unspent Grant
The Scottish Milk and Healthy Snack Scheme funds a daily portion of plain fresh cow’s
milk (or specified alternative) and a healthy snack (fruit or vegetables) for pre-school
children spending 2 hours or more in the care of a regulated day care provider and/or
childminders that has registered for the Scheme.  The unspent grant from 2022/23 will
contribute towards the cost of the scheme in 2023/24.
43,470 0 0
012 Education Youth Music Initiative 39,618 Unspent Grant To fund YMI projects across the remainder of the academic year 2022/23. 39,618 0 0
013 Education Strategic Equity Fund 29,255 Unspent Grant
Strategic Equity Funding must provide targeted support for children and young people
(and their families if appropriate) affected by poverty to achieve their full potential,
focusing on targeted improvement activity in literacy, numeracy and health and
wellbeing. The Strategic Equity Fund Spending Plan will enhance staffing, provide
teacher cover and support to schools not in receipt of PEF funding, to be spent by the
end of the 2022-23 academic year.
29,255 0 0
014 Education EDU - Music Instructors 13,354 Scottish Government
Initiatives
Scottish Government Initiative to support music tuitution. Unspent amount designated
for expansion of the service 2022-23 academic year. 13,354 0 0
015 Education EDU - CAST Projects Budget 11,956 Unspent Grant Unspent grant from Creative Learning Networks Fund to support creative arts projects
across the remainder of the academic year 2022-23. 11,956 0 0
016 Education Play on Pedals 9,953 Unspent Grant
Unspent Play On Pedals grant to allow the procurement of a fleet of cycles and helmets
to support delivery across up to 19 nurseries, as well as other equipment and
maintenance.
9,953 0 0
NEW Automatic Carry Forward Earmarkings - 2022-23 Year-end
Spending profile

Page 34

Ref Service Description New
Earmarking £
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Spending profile
017 Education
EDU - Armed Forces Covenant Fund - Colgrain Primary School
2,020 Unspent Grant
Unspent grant to be spent on further resources as part of spending plan. Grant awarded
for connecting families at Colgrain hub. Due to delays in getting resources ordered and
being out of stock, the grant has been extended to the end of May 2023.
2,020 0 0
018 Education Transport for 'Smoke Free Me' Drama Production 2,000 Unspent Third Party
Contribution
NHS funding contribution towards the cost of school transport for pupils attending the
Smoke Free Me drama production which was delivered across Argyll and Bute. 2,000 0 0
019 Education EDU - Support Fund for Service Children 165 Unspent Grant Unspent Grant from Naval Children's Charity to go towards providing art and craft
materials for groups across Helensburgh and Lomond. 165 0 0
020 Education
EDU - Armed Forces Covenant Fund - Rhu Primary School
47 Unspent Grant Unspent grant to be spent on further resources as part of agreed spending plan. Grant
awarded for Community Café, art teacher, hire of church hall and resources. 47 0 0
EXECTIVE DIRECTOR (KIRSTY FLANAGAN)
021 Development & Economic Growth Coastal Communities Fund (Crown Estates) 1,261,200 Unspent grant 2022-23 grant funding for Coastal Communities Fund (Crown Estates). 1,261,200 0 0
022 Development & Economic Growth UK Shared Prosperity Fund (UKSPF) 559,291 Unspent grant 2022-23 grant funding for UK Shared Prosperity Fund (UKSPF). 559,291 0 0
023 Development & Economic Growth Place Based Investment Programme 299,000 Unspent grant 2022-23 grant funding for Place Based Investment Programme. 299,000 0 0
024 Development & Economic Growth Islands Infrastructure Fund 265,258 Unspent grant 2022-23 grant funding for Islands Infrastructure Fund. 265,258 0 0
025 Development & Economic Growth Scottish Govt Islands Programme 100,000 Unspent grant 2022-23 grant funding for Scottish Govt Islands Programme. 100,000 0 0
026 Development & Economic Growth LHEES (Local Heat & Energy Strategy) 75,000 Unspent Grant Scottish Government grant to deliver Local Heat & Energy Strategy which will fund
consultany costs required to iplement the scheme going forward. 75,000 0 0
027 Development & Economic Growth Rapid Rehousing 65,335 Unspent grant
Implementing the Rapid re-Housing Plan. This will include, but not exclusively, Rent
arrears prevention fund; Decoration project; Flexible Emergency Fund; Mental Health
/Addictions Practitioner; Housing First / RRTP training.
65,335 0 0
028 Development & Economic Growth UK Community Renewal Fund 59,812 Unspent grant 2022-23 grant funding for UK Community Renewal Fund. 59,812 0 0
029 Development & Economic Growth Shelter Scotland Housing Funding 54,000 Unspent third party
contribution
Year 1 contribution from Shelter Scotland to fund 50% of a 2 year temporary Empty
Homes Officer.  Post is not yet recruited to but should be in place during 23-24 and 50%
of the costs will be drawndwon from this earmarked reserve when required.
40,500 13,500 0
030 Development & Economic Growth Rothesay Pavilion 28,267 CHORD funding Build up a provision towards future Council commitment to provide additional financial
support up to £150,000 per annum towards Rothesay Pavilion running costs. 0 0 28,267
031 Financial Services Housing Benefits Private 91,089 COVID-19
Specific funding allocation for Housng Benefit including DHP. Funds will be used to
continue to support vulnerable people initially financially affected by the COVID-19
outbreak but now facing the cost of living crisis to sustain their tenancies.  T
91,089 0 0

Page 35

Ref Service Description New
Earmarking £
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Spending profile
032 Financial Services Benefit Admin Grant 80,469 Unspent Grant
Grant monies which would have to be repaid if not utilised for intended purpose. 
Benefit Administration activities in the build up to the migration of Housing Benefit to
Universal Credit.  These monies are committed to cover ongoing Benefit Administration
activities in 22/23, 23/24 and 24/25 when it is now expected that the full migration of
working age Housing Benefit caseload to Universal Credit will be complete.  Monies will
be used to implement the recommended changes from the recent Revs and Bens BPR
(£50,000), build resilience including staff overtime, outsourcing of Housing Benefit
processing during the transition and cover casual staff for the Universal Credit migration
(£20,500). Monies also set aside for additional works to the value of £40,000 with the
software suppliers around enhancing the Revs and Bens system, automating processes
and transitioning customers to use digital gateways to contact the service.
80,469 0 0
033 Financial Services Cost of Living Payments - Admin funding 72,550 Unspent Grant
Administration funding associated with Scottish Government schemes to issue monies to
Low income Households for the Cost of Living Payments.To provide additional staffing to
help with the backlog and and to support any further Scottish Government funding
initiatives during 23/24 and 24/25
72,550 0 0
033 Financial Services Self Isolated Support Grant 2,933 COVID-19 Unspent admin funding for processing Self isolation Support Grants. 2,933 0 0
034 Roads & Infrastructure Services Piers and Harbours 1,146,500 Piers and Harbours
Investment Fund
Funding generated through increased harbour fees and charges in order to generate
funds to meet the costs of the prudential borrowing required to develop and maintain
the Council's harbour assets and infrastructure. Under the Harbours Act 1964, section
42, as a statutory harbour undertaker, the Council must prepare an annual statement of
accounts relating to the harbour activities and any associated activities for each harbour
for which it is the statutory harbour authority. This requirement cannot be satisfied by
the preparation of a statement of accounts which relates to other Council activities in
addition to harbour activities.  In essence, any surplus in the Piers and Harbours budget
must be reinvested in the marine asset and reflected in accounts.
0 0 1,146,500
035 Roads & Infrastructure Services Fleet - Vehicle Replacement 158,661 Fleet - Timing Delay Timing delay in fleet replacement causing one-off saving which will be used to purchase
additional Fleet as required 158,661 0 0
036 Roads & Infrastructure Services Hermitage Park 14,611 Hermitage Park
The Hermitage Park regeneration project has a significant investment from the Heritage
Lottery Fund (HLF) which has a requirement to have a 10 year Management and
Maintenance Plan.  This will be partly funded by existing Council revenue budgets but
should also be supplemented by any additional income which can be generated from
park activities.  Part of the HLF conditions are that all income generated by the park
should be retained to support the Management and Maintenance Plan and a result of
this requirement, any unspent income generated by the park is retained for future years
requirements.
14,611 0 0
037 Roads & Infrastructure Services Electric Vehicle Chargers 16,560 Electric Vehicle
Charging Surplus To fund future installation and maintenance of electric vehicle charging points. 0 16,560 0
NON DEPARTMENTAL
038 Non Departmental Strategic Housing Fund 2,230,584 Strategic Housing Fund
Strategic Housing Fund. Council tax collected during 2022-23 from the second homes
discount on properties. Requires to be earmarked as part of the Strategic Housing Fund
balance.
0 0 2,230,584
039 Non Departmental Oban TIF (Tax Incremental Financing - Excess NDR) 623,395 Previous Council
Decision
This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure
projects.  This fund will be used in the future as TIF projects are delivered. 0 0 623,395
040 Other Operating Income and
Expenditure Educational Support to Ukrainian Children and Young People 335,671 Unspent Grant Balance of grant received in 2022-23 for provision of childcare and education support to
Ukrainian children and young people. 335,671 0 0

Page 36

Ref Service Description New
Earmarking £
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Spending profile
041 Other Operating Income and
Expenditure COVID Funding 418,337 COVID-19 Net balance on COVID cost centres at year end 2022/23 with proposals on use to be
developed. 0 0 418,337
11,708,548 7,231,405 30,060 4,447,083

Page 37

Previously Agreed Earmarked Balances Appendix 4
Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Completed projects during 2022/23 18,595 18,595 0 0 0 Unspent Budget 0 0 0
Completed projects during 2022/23 4,404,625 4,404,625 0 0 0 Previous Council
Decision
Completed projects during 2022/23 1,873,000 1,873,000 0 Capital Projects 0 0 0
Completed projects during 2022/23 1,397,751 1,397,751 0 0 0 COVID-19 0 0 0
Completed projects during 2022/23 2,425,478 2,425,478 0 0 0 Previous Council
Decision
0 0 0
Completed projects during 2022/23 962,278 962,278 0 0 0 Scottish
Government
Initiatives
0 0 0
Completed projects during 2022/23 1,400,685 1,400,685 0 0 0 Unspent Grant 0 0 0
CHIEF EXECUTIVE'S UNIT
001
Community Planning NHS Highland and other CPP Partners
Contribution Towards the CPP
Running and Project Costs
70,598 0 70,598 Unspent Third
Party Contribution
Will be deployed as required in the day-to-day running of the
Community Planning Partnership's operations.
70,598 0 0
002
Community Planning Community Planning - temp post to
support communities
55,000 0 55,000 COVID-19 As agreed at Policy & Resources committee on 9 December
2021, allocation of £0.055m to a post to support the economic
and social recovery together with the building back stronger
themes.
55,000 0 0
003
Community Planning Covid impacts – support to
communities’
44,047 0 44,047 COVID-19 Funding provided in relation to the Local Self-Isolation
Assistance Service.  The Community Planning and
Development Team will work with community groups to
support their community response and resiliency to Test and
Protect and the longer term impacts of COVID-19 on local
community organisations.
44,047 0 0
004
Community Planning Communities and Partnership Team 8,855 0 8,855 Unspent Budget The funds have originated from externally sourced income due
to an employee being seconded to the Scottish Community
Development Centre (SCDC).  The funds will be used to support
the team in relation to meeting its priorities of Building Back
Better (Communities), Climate Change and the review of the
Argyll and Bute Outcome Improvement Plan.
8,855 0 0
005
Community Planning Gaelic Development 8,235 0 8,235 Unspent Budget To fund Gaelic specific work and project work of the
Community Planning Partnership including the development of
the new 10 year Outcome Improvement Plan
8,235 0 0
EXECUTIVE DIRECTOR (DOUGLAS HENDRY)
006
Commercial Services Rothesay Pavilion Charity 750,000 0 750,000 Previous Council
Decision
Agreed at Council meeting February 2020, £750k additional
revenue support subject to conditions which seek to minimise
the risk to the Council as far as is reasonably practicable
including requirement for adequate business and financial
management and regular reporting by RPC.
0 750,000 0
Spending profile

Page 38

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
007
Commercial Services Climate Change Programme 500,000 0 500,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the
Council committed to additional investments with £0.500m for
Climate Change, building on previous £1.1m investments,
including projects within Argyll and Bute’s schools. 
Expenditure in 22/23, draw down in 23/24.
500,000 0 0
008
Commercial Services Contingent Liability - Capital Project 453,346 14,655 438,691 Existing Legal
Commitments
There is a contingent liability in respect of Helensburgh capital
projects with future costs expected for fees relative to court
proceedings and remedial works required to be carried out,
the extent of which are still unknown.
438,691 0 0
009
Commercial Services One Council Property 368,633 0 368,633 Previous Council
Decision - Other
It was agreed in 2020/21 to retain revenue generated from
commercial activity in One Council Property for future
investment across the Council’s property portfolio to ensure it
remains fit for purpose.
368,633 0 0
010
Commercial Services Rothesay Pavilion Essential repairs 306,400 0 306,400 Previous Council
Decision
Essential repairs to deal with potential health and safety risks
and to avoid further deterioration.  Budget provision was
approved by the Policy and Resources Committee on 21
August 2014. 
0 306,400 0
011
Commercial Services Energy Efficiency Fund 218,351 0 218,351 Energy Efficiency
Fund
The Central Energy Efficiency Fund (CEEF) was launched by the
Scottish Government in 2004 to support the delivery of energy
efficiency and renewable energy measures to reduce carbon
emissions in the Scottish Public Sector.  The original Council
allocation of funding was £286k and there were terms and
conditions attached to the funding which included formally
reporting to the SG on energy efficient measures implemented
from the fund.  Part of the stipulation of the funding was that
any savings from energy efficiencies were reinvested into the
fund in order that there was a revolving fund to continually
reinvest in energy efficiency measures.  The terms and
conditions attached to the fund expired on 31 March 2016,
however there is an expectation that local authorities will
maintain a revolving energy efficiency fund to support future
carbon reducing projects.  Maintaining this fund also assists
the Council to make progress towards reducing carbon
emissions and therefore not only to secure savings in energy
costs but also in the cost of Carbon Reduction Scheme
Allowances.
218,351 0 0
012
Commercial Services Estates - NDR Revaluation Appeals 84,688 0 84,688 Unspent Budget
The Council agreed to make provision to meet the cost of
appealing Non Domestic Rates (NDR) revaluations which were
imposed from April 2017. The remaining funds were carried
forward to the 2023/24 revaluation cycle however a recent
change in position by the Scottish Government may restrict
the appeals which can be made. This is still under discussion
and Gerald Eve Surveyors have been appointed as specialist
advisers on this matter. In the event that appeals are limited
there may be an opportunity to utilise Gerald Eve for more
general valuation advice subject to Procurement approval.
84,688 0 0

Page 39

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
013
Commercial Services Demolition of former Lochgilphead
Primary and Rothesay Secondary
School
320,000 261,125 58,875 Unspent Budget To fund the demolition of the former Lochgilphead Primary
School and former Rothesay Academy (subject to the removal
of the listing). Lochgilphead Primary complete and remainder
of funds to be used to commence Rothesay Project.
58,875 0 0
014
Commercial Services Free Sanitary Provision Scheme 75,090 23,958 51,132 Scottish
Government
Initiatives
To fund the continued implementation of the scheme through
increased provision of reusable products, improved provision
in rural communities by working in partnership with Education
and improving the storage of products in toilets so that they
are more readily available. A dedicated officer was appointed
in November 2022 to develop the scheme and increase
provision across Argyll and Bute including a postage facility.
51,132 0 0
015
Commercial Services Mid Argyll Community Pool 30,000 30,000 Previous Council
Decision
At the Council Budget meeting on 23 February 2023, the
Council committed to a one-off investment of £0.030m to Mid
Argyll Community Pool in response to an external funding
request
30,000 0 0
016
Commercial Services MacTaggart Leisure Islay 30,000 30,000 Previous Council
Decision
At the Council Budget meeting on 23 February 2023, the
Council committed to a one-off investment of £0.030m to
MacTaggart Leisure, Islay in response to an external funding
request
30,000 0 0
017 Commercial Services Site Investigation Works 21,013 0 21,013 Unspent Budget For Site Investigation works in relation to Tweeddale Street Car
Park and Oban Airport Business Park, exploring commercial
21,013 0 0
018 Commercial Services Free School Meals Funding 12,650 0 12,650 Scottish
Government
Scottish Government funding for the provision of Free School
Meals or meal alternative e.g direct cash payment or food
12,650 0 0
019 Education EDU - Early Learning & Childcare -
1140 Hours Expansion
7,431,942 1,900,564 5,531,378 Unspent Grant The funds will be utilised to improve and expand the Argyll and
Bute Early Years Delivery Plan for 1140 hours which will
5,531,378 0 0
020 Education Provision for Learning Estate
Investment Programme
1,000,000 0 1,000,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the
Council committed to additional investments - £1m to help
1,000,000 0 0
021 Education Logistics Funding - Safe Opening of
Schools
940,605 241,569 699,036 COVID-19 Scottish Government funding to ensure the safe opening and
operation of schools. Includes transport, PPE, cleaning,
699,036 0 0
022 Education Additional Support Needs - Additional
Support for Learning Project
544,169 34,027 510,142 Scottish
Government
Government initiative to support the provision of support staff
in schools as part of 'Support for Additional Support for
510,142 0 0
023 Education Expansion of Universal Free School
Meals
468,626 43,626 425,000 Scottish
Government
To support the continued phased implementation of Universal
Free School Meals for Primary children.
425,000 0 0
024 Education Additional Teaching/Support in
Schools/Digital Devices/Family Home
488,310 67,112 421,198 COVID-19 Continuation of funding for additional staffing, teachers,
support staff, additional devices for pupils and additional
421,198 0 0
025 Education Access to Counsellors in Schools 364,699 25,217 339,482 Scottish
Government
Government initiative to support delivery of the access to
school counselling service, in line with the commitment set out
339,482 0 0
026 Education DMR Scheme of Delegation for
Schools
1,981,510 1,717,473 264,037 DMR Schools To be spent in accordance with DSM regulations. 264,037 0 0
027 Education Education to Support Young People 321,816 130,774 191,042 COVID-19 As agreed at the Council Meeting on 25 February 2021 with an
original allocation of £0.600m.  Agreed to fund a package of
122,331 68,711 0
028 Education Education Transformation Fund 187,526 40,947 146,579 Unspent Budget At the Council meeting on 27 February 2020, it was agreed to
input £400k into Education Digital Learning.  The additional
146,579 0 0
029 Education 100 Day Promise - Increase Teacher
and Pupil Support Assistant Numbers
374,095 259,574 114,521 Scottish
Government
Scottish Government initiative to increase the number of
teachers and support assistants in schools.
114,521 0 0
030 Education Community Mental Health and
Wellbeing support to Children and
210,285 101,804 108,481 Scottish
Government
Scottish Government/COSLA Initiative to support the work
under the Children and Young People's Mental Health and
108,481 0 0
031 Education Recruitment of Additional Teachers
and Support Staff in Schools
136,715 85,344 51,371 COVID-19 Fund additional teachers and support staff. 51,371 0 0
032 Education Scottish Government Initiatives:
Developing the Young Workforce
37,478 0 37,478 Scottish
Government
Developing the Young Workforce: Developing an Argyll and
Bute foundational apprenticeship scheme, developing support
37,478 0 0
033 Education Scottish Attainment Challenge - Care
Experienced CYP Funding
55,544 21,003 34,541 Unspent Grant To provide targeted support for care experienced children and
young people to achieve their full potential.
34,541 0 0
034 Education ERASMUS French and Spanish
Training for Practitioners
41,614 7,691 33,923 Unspent Grant Due to COVID-19 and with restrictions on teachers going
abroad to Spain and France for Teacher language training, this
33,923 0 0
035 Education Languages 1 + 2 28,056 0 28,056 Scottish
Government
Languages 1+2: Grant provided for implementing  the Scottish
Government's 1+2 languages policy for Primary schools.  The
28,056 0 0
036 Education Digital Projects (Supply Staff Booking
System)
35,000 9,900 25,100 Unspent Budget To deliver a number of Digital ServiceTransformation Projects
with a commitment of £0.035m towards a Supply Staff Booking
9,900 15,200 0

Page 40

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
037 Education Schools ADP Grant 19,000 0 19,000 Unspent Grant Providing social and emotional support to pupils who are
affected by drugs and alcohol.
19,000 0 0
038 Education GIRFEC 49,310 34,072 15,238 Scottish
Government
To support Argyll and Bute’s contribution to implementing
GIRFEC and the Children and Young Person (Scotland) Act to
15,238 0 0
039 Education Bord Na Gaidhlig -
Parental/Community Gaelic
12,720 0 12,720 Unspent Third
Party Contribution
This funding was used for Gaelic Classes and Support being
delivered in the academic year 21/22. An issue with invoicing
12,720 0 0
040 Education Skype for Business for Education /
Digital Projects (Skype for Business)
10,000 0 10,000 Unspent Budget To fund the initial capital costs for the implementation of
Skype for Business for Education.  This will bring the Education
10,000 0 0
041 Education Ministry of Defence Grant - support
for military children
2,607 0 2,607 Unspent Grant Providing social and emotional support to pupils who are
affected by deployment who may have gaps in their Education
2,607 0 0
042 Education Education Learning Estate Condition
Surveys
77,440 75,625 1,815 Unspent Budget To fund the delivery of School Core Facts (SCF) compliant
Condition Surveys for prioritised School Buildings.
1,815 0 0
043 Education Food for Thought 577 442 135 Unspent Grant Lochgoilhead Primary have orders pending and plans for the
remaining balance of the Food for Thought Grant.  This spend
135 0 0
044 Education COVID 19 - CO2 Monitors 4,346 4,249 97 Unspent Grant To continue the work of providing CO2 monitoring in schools
and  day care settings to mitigate against the risks of airborne
97 0 0
045 Education Adult Services - c/f Health and
Wellbeing funding
385 0 385 0 Unspent Third
Party Contribution
English for Speakers of Other Languages (ESOL) funding and
HandWB tutor costs.
0 0 0
046 Legal and Regulatory Services Education Purchasing Officers 210,000 0 210,000 Unspent Budget The earmarked funds will be used to fund an education
purchasing team within the Procurement Service for two
105,000 105,000 0
047 Legal and Regulatory Services Welfare Rights Support 172,000 40,366 131,634 COVID-19 As agreed at the Council Meeting on 25 February 2021 - an
allocation of £0.172m.  As part of our focus on Improving
80,184 51,450 0
048 Legal and Regulatory Services CCTV Maintenance 62,101 69 62,032 Unspent Grant Maintenance of CCTV systems.  Funds transferred from
external bodies (Police Scotland) to maintain systems for
15,000 47,032 0
049 Legal and Regulatory Services Councillor IT Equipment 65,000 20,443 44,557 Unspent Budget There is currently no budget for the provision and renewal of
IT equipment for members. the earmarking identifies a
29,557 15,000 0
050 Legal and Regulatory Services Digital Projects: Hybrid Council
meetings
55,000 11,698 43,302 Unspent Budget The funding will be used to maintain the ICT equipment used
to support the provision of on-line and hybrid Council
43,302 0 0
051 Legal and Regulatory Services Community Safety Partnership 37,538 0 37,538 Existing Legal
Commitments
Community Safety Partnership funding received to be used for
Community Safety Partnership purposes. These monies will be
37,538 0 0
052 Legal and Regulatory Services Debt Counselling & Welfare Rights 27,025 5,573 21,452 Unspent Budget To meet the cost of a Debt Counselling and Welfare Rights
Management System.
5,965 15,487 0
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN)
053
Customer Support Services Microsoft Licensing Costs 877,888 0 877,888 Previous Council
Decision - Other
To meet  licensing and set-up costs for the Microsoft 365
rollout
451,856 426,032 0
054
Customer Support Services ICT computer replacement 531,000 531,000 Previous Council
Decision
At the Council Budget meeting on 23 February 2023, the
Council committed to supporting the council's digital resilience
and overall efficiency with investment in ICT assets.
531,000 0 0
055
Customer Support Services Skills Development Scotland 150,936 0 150,936 Unspent Grant We receive the money from Skills Development Scotland (SDS)
to enable us to deliver Foundation and Modern Apprenticeship
programmes.  The money covers the salaries of the two Tutors
we employ and also any materials we require to deliver the
150,936 0 0
056
Customer Support Services Security Operations Centre
Subscription/ Digital Projects
180,000 66,406 113,594 Unspent Budget There is a requirement to pay for a 3-year subscription at
£60,000 per annum with a cost pressure being added to the
ICT revenue budget to cover the costs from 2025-26 onwards. 
53,594 60,000 0
057
Customer Support Services Growing our Own and Modern
Apprentices
109,150 0 109,150 Unspent Budget Funding earmarked to support trainee development and
modern apprenticeship opportunities based on priority
workforce risk areas. These areas have been identified and
proposals developed. £95,790 to be spent in 23/24 and
£13,360 to be spent in 24/25 to fund a graduate trainee and 3
apprentices to deliver trainee development and modern
apprenticeship opportunities
95,790 13,360 0

Page 41

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
058
Customer Support Services Self Isolated Support / Self Isolated
Support Grant (HR)
115,000 49,750 65,250 COVID-19 These were monies that were provided by Scotgov to fund
additional overtime and resources for Shielding/Caring for
People and Test and Protect activities.
The funds are being used for a number of Customer Service
and Business efficiency related projects including a system and
consultancy of RPA (robotic process automation) and
application development.  A full corporate website upgrade
and renewal using specialist web resources and the Digital
Reception Project.
65,250 0 0
059
Customer Support Services Digital Projects (Increase in Schools
Bandwidth)
63,455 0 63,455 Unspent Budget To complete one of a number of Digital Service Transformation
projects with a commitment of £0.064m to increase Schools
Bandwidth. 
63,455 0 0
060
Customer Support Services Implementation of Gaelic Language
Plan
30,000 0 30,000 Previous Council
Decision
Agreed at Council Meeting February 2021.  Provision of
funding for delivery and implementation of the council’s Gaelic
Language Plan in recognition of the contribution that Gaelic
makes to economic growth and to the tourism sector, and to
enable delivery of key activities within the plan which
currently receive no revenue funding.
30,000 0 0
061
Customer Support Services Business Development Training 27,601 0 27,601 Unspent Budget This budget is funding ongoing leadership development,
coaching, action learning sets and commissioned training
including Priority Management.
27,601 0 0
062
Customer Support Services Learning and Development 36,508 17,072 19,436 Unspent Budget In order to maximise the opportunities and efficiencies of
digital learning, this funding will be used to support the
extension of digital learning in order to deliver the Digital
Learning Strategy, which was approved in FQ4 20/21.
19,436 0 0
063 Customer Support Services Establishing HR Service Centre 30,000 16,176 13,824 Unspent Budget To facilitate the implementation of technical efficiency
improvements and new processes
13,824 0 0
064
Customer Support Services Bord na Gaidhlig 17,330 3,734 13,596 Unspent Grant Grant funding from Bord na Gaidhlig. Ongoing spend ad hoc to
deliver on commitments in the Gaelic Language Plan. Grant
income from GLAIF continues to be added to this total and
then paid out to projects.
0 13,596 0
065
Customer Support Services Digital Projects (Replacement
Learning Management System)
11,470 0 11,470 Unspent Budget To deliver a number of Digital Service Transformation Projects
with an original commitment of £0.030m towards a
replacement Learning Management System £0.030m.
11,470 0 0
066
Development and Economic Growth Crown Estates / Coastal Communities
Fund
1,634,604 0 1,634,604 Unspent Grant 2021/22 Crown Estate Funding (Coastal Communities Fund) of
£1.635m.  Projects approved at 17 February 2022 P&R
Committee totalling £1.191M, further report required to
allocate remaining £444k.  £772k has been spent on capital
projects which will be drawn down in 23-24.  The remainder is
allocated to projects that are not yet underway and progress
will be monitored closely on the plan for this expenditure.
771,665 862,939 0
067
Development and Economic Growth Coastal Communities (Capital) 680,000 191,000 489,000 Unspent Grant 2020/21 Crown Estate Funding (Coastal Communities Fund)
totalling £1.504m. Expenditure/allocation to projects delayed
due to covid, now allocated as per report to P&R on 18 Feb
2021. £680k relates to works within the current capital
programme. Projects include Dunoon STEM Hub 100k, Dunoon
Cycle Bothy 249k,  Ardrishaig North Project 50k and Arrochar
car park £90k.   All projects underway during 22/23 and should
be drawn down in 23/24.
240,000 249,000 0

Page 42

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
068
Development and Economic Growth Coastal Communities 618,803 200,000 418,803 Unspent Grant 2020/21 Crown Estate Funding (Coastal Communities Fund)
with original balance of £1.504m. Expenditure/allocation to
projects delayed due to covid, now allocated as per report to
P&R on 18 Feb 2021. £680k relates to works within the current
capital programme, moved to line Coastal Communities
(Capital).   Remaining balance for Campbeltown Community
Action Plan (£50k), Helensburgh Clyde Street (£350k), Bute
Community Land Bike Transfer Station (£10k) Modular Hub
Lochgilphead (£5k) and Tarbert Public Realm (£4k) to be spent
in 23-24.
418,803 0 0
069
Development and Economic Growth Oban TIF (Tax Incremental Financing) 457,444 72,251 385,193 Previous Council
Decision
Will be used to fund the TIF Programme office for a further 3
years as well as the programme office for Rural Growth Deal
beyond the funding that was agreed at Council for this in
February 2021.
116,000 269,193 0
070
Development and Economic Growth Rothesay Pavilion - Revenue
contribution
349,440 0 349,440 CHORD Build up a provision towards future Council commitment to
provide additional financial support up to £150,000 per annum
towards Rothesay Pavilion running costs.
150,000 199,440 0
071
Development and Economic Growth Helensburgh CARS 327,000 0 327,000 Previous Council
Decision - Other
Conservation Area Regeneration Scheme for Helensburgh. 
Grants awarded to upgrade conservation areas in Helensburgh
such as shop fronts, town centre accommodation and other
priority buildings.  Business Case not yet approved.
163,500 163,500 0
072
Development and Economic Growth Staycation and Marketing Argyll and
Bute
692,013 302,021 389,992 COVID-19 As agreed at the Council Meeting on 25 February 2021 with an
original allocation of £0.800m.   This will include provision of
additional waste disposal facilities and other facilities that will
be informed by the Motorhome and Informal Camping Survey.
As agreed at Council on 24 February 2022, Staycation
investment £0.100m.  Augments the 2021/22 £0.5m staycation
initiative with an additional investment of £100k, including
support for community groups and partners in the provision of
facilities which can support increasing staycation visitor
numbers during the 2022/23 and 2023/24 seasons.
389,992 0 0
073
Development and Economic Growth Oban TIF (Tax Incremental Financing -
Excess NDR)
252,256 0 252,256 Previous Council
Decision
This is the surplus NDR after paying all Loans Charges in
respect of TIF infrastructure projects.  This fund will be used in
the future as TIF projects are delivered.
0 252,256 0
074
Development and Economic Growth Tackling Digital Exclusion Top-Up
Fund
250,000 32,400 217,600 COVID-19 As agreed at the Council Meeting on 25 February 2021. 
Establishes the Tackling Digital Exclusion Top Up Fund to
support communities and in some cases individuals that are
missing out on national programmes due to logistics and
economies of scale.  While vouchers are available from the UK
and Scottish Governments in some cases these do not cover
the full cost of infrastructure builds.  Expenditure should be
incurred during 23-24 to draw down against.
217,600 0 0
075
Development and Economic Growth Lochgilphead CARS 200,000 0 200,000 Previous Council
Decision - Other
Conservation Area Regeneration Scheme for Lochgilphead 
Grants awarded to upgrade conservation areas in
Lochgilphead such as shop fronts, town centre
accommodation and other priority buildings.
100,000 100,000 0
076
Development and Economic Growth Town Centre Fund 129,956 0 129,956 Unspent Grant This represents the revenue funded projects within the Town
centre  fund which have yet to be paid out plus the overall
contingency amount which was built into the overall scheme.
129,956 0 0

Page 43

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
077
Development and Economic Growth LACER Funding (Sector Support
Grant)
150,000 54,602 95,398 COVID-19 Local Authority COVID Economic Recovery Fund grant.  This
will provide funding, either part of the small  business
development grant or standalone, to help micros and small
business to implement projects that contribute to the sector
as well as benefitting the business, for example: Tourism and
hospitality, food and drink or retail.  With option to provide
additional business support to hard hit areas including Bute
and Kintyre where unemployment remains higher than
average - support via specialist advice, locally tailored grants
to meet local priorities and targeted marketing activity. To be
split £115,000 Business support via Business Gateway and
£35,000 for Shop fronts
95,398 0 0
078
Development and Economic Growth Strategic Events & Festivals 115,764 35,100 80,664 Unspent Budget At the Council meeting on 25 February 21, a decision was
taken to agree £90k funding for Events and Festivals for 22/23,
in order that the application process can commence during
21/22 and that this agreed figure be augmented by any
underspend remaining from the 20/21 financial year.  At 24
February 22, decision made to agree £90k for 23/24, in order
that the application process can commence during 22/23 and
that this agreed figure be augmented by any underspend
remaining from the 21/22 financial year.  Applications have
been received and payments will be made in 2023-2024.
80,664 0 0
079
Development and Economic Growth Economic Development - temp post
to support economic recovery
55,000 0 55,000 COVID-19 As agreed at Policy & Resources committee on 9 December
2021, allocation of £0.055m to a post to support the economic
and social recovery together with the building back stronger
themes.  To be used to fund Settlement Project Support
Officer during 23-24.
55,000 0 0
080
Development and Economic Growth Island Post 50,461 0 50,461 Unspent Budget To fund a temporary post at LGE11 to assist with the National
Islands Plan Implementation Route Map 2020-2025.
50,461 0 0
081
Development and Economic Growth EH Covid Posts 41,145 3,370 37,775 COVID-19 Funding initially for 2 posts for 2 years.  Posts were intially
recruited to with one leaving and the other going on maternity
leave resutling in delays in expenditure.  One employee is now
back from maternity leave and earmarked reserve will be
drawn down to cover their costs in 23-24.
37,775 0 0
082
Development and Economic Growth Digital Boost 34,894 1,054 33,840 Unspent Grant To provide funding for Digital Boost program.  Initially was to
be used to help fund the programme in 21/22 but additional
income was received by the service so there will be some
slippage into 2023/24
33,840 0 0
083
Development and Economic Growth LACER Funding (New Enterprise
Support Grant)
120,000 88,841 31,159 COVID-19 Local Authority COVID Economic Recovery Fund grant.  This
funding would provide £3,000 grants to help new businesses
start up and establish.  Fund fully committed, there was a
delay in getting all payments made and remainder will be
made in 23-24.
31,159 0 0
084
Development and Economic Growth LACER Funding (Shop Local) 40,000 13,207 26,793 COVID-19 Local Authority COVID Economic Recovery Fund grant.  This
funding would provide funding to continue the Shop Local
scheme into 2022/23 and 2023/24, buying additional cards and
allow the cards to gather momentum and support local
businesses.
26,793 0 0
085
Development and Economic Growth LACER Funding (Small Business
Development Grant)
200,000 175,012 24,988 COVID-19 Local Authority COVID Economic Recovery Fund grant.  This
funding will provide funding of between £500 and £5,000 to
help existing micro and small businesses to improve their
resilience or growth via projects to implement green
initiatives, implement digital development, implement
marketing improvements and improve efficiency/innovation. 
Fully committed with final payments due in 2023-2024.
24,988 0 0

Page 44

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
086
Development and Economic Growth Gypsy Traveller Grant / LACER
Funding (Gypsy Travellers)
76,140 43,314 32,826 Unspent Grant Local Authority COVID Economic Recovery Fund grant.  This
funding would pay for MECOPP (Minority Ethnic Carers of
People Project) to engage with the Gypsy Travellers
community on the important subject of the cost of living
increases, fuel poverty and the impact of factors such as their
remote rural locations and the facilities available to them for
everyday living  have on their livelihoods.  Claim for 22/23
awaited from ACHA, earmarking will be drawn down once
received and paid.
32,826 0 0
087
Development and Economic Growth Royal National Mod 40,000 20,000 20,000 Unspent Budget One off funding allocation for the Royal National Mod agreed
as part of the budget setting process for 2019/20. Grant
contract issued. Proposed payment of £20k per annum starting
2020/21  (2023/24 final payment of £20k)
20,000 0 0
088
Development and Economic Growth Kilmartin Museum 76,207 56,208 19,999 Previous Council
Decision - Other
Upgrade of Kilmartin Museum, works carried out by Museum
with grants awarded upon completion milestones.  Budget
allocated to capital originally but was moved out of capital and
into earmarked reserves at 2020/21 budget meeting.  £20k
retention due to be paid out in 23/24.
19,999 0 0
089
Development and Economic Growth Proposed Local Development Plan 2 87,910 68,000 19,910 Previous Council
Decision - Other
During 19/20, a cost pressure of £68,000 was allocated to deal
with the costs associated with the production of Local
Development Plan 2.  Due to delays this work has only
commenced at beginning of 2022/23 where expenditure will
be fully utilised.  Remaining funds will be drawndown in 23/24
for consultancy costs
19,910 0 0
090
Development and Economic Growth UK Levelling Up Fund 125,000 105,535 19,465 Unspent Grant Development funding to help prepare UK Levelling Up Fund
bids for 2 projects proposed by the Council, received from
Scottish Government.   Remaining funds will be drawn down in
23/24 for Consultant costs.
19,465 0 0
091
Development and Economic Growth Place Based Investment Programme 123,087 109,812 13,275 Unspent Grant Projects approved at 12 August 2021 P&R Committee totalling
£821k, Remaining funds committed and will be spent during
23/24.
13,275 0 0
092 Development and Economic Growth Shop Local Campaign 1,992 1,403 589 Unspent Grant Grant received to support a Shop Local campaign.  589 0 0
093
Financial Services Housing Benefits Private 231,027 592 230,435 COVID-19 Specific funding allocation for Housing Benefit including DHP.
Funds will be used to continue to support vulnerable people
initially financially affected by the COVID-19 outbreak but now
facing the cost of living crisis to sustain their tenancies.  This
earmarking will help offset potential overspends in the DHP/
Scottish Welfare Fund budget going forward.
230,435 0 0

Page 45

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
094
Financial Services Flexible Food Fund 510,573 316,417 194,156 COVID-19 Financial Insecurity funding from Scottish Government routed
into the Argyll and Bute Flexible Food and Fuel Fund (ABFFFF)
is aimed at tackling financial insecurity for adults and families
across Argyll and Bute.  Working in partnership with the
Community Food Forum, Bute Advice Centre and ALIenergy,
households with low incomes and no access to cash savings
can apply for immediate financial support.  The Fund helps
support daily living expenses.   In the period from 10 January
2021 to 30 November 2022  client gain in extra benefits
income for families was £2.25 million with 1,550 families had
been supported. The project has been extended to 31 March
2025 with funding coming from the UK Shared Prosperity Fund
and this earmarking to support it. It is proposed that
underspends from the Flexible Funding for Supporting People
at tier 4 COVID will be used to support this project over the
next two years to cover a funding gap of £50,000. The Scottish
Government have provided this funding and have endorsed
this award winning project promoting it as part of the solution
to end the need for foodbanks nationally.
108,000 86,156 0
095
Financial Services Benefit Admin Grant 130,454 40,044 90,410 Unspent Grant Grant monies which would have to be repaid if not utilised for
intended purpose.  Benefit Administration activities in the
build up to the migration of Housing Benefit to Universal
Credit.  These monies are committed to cover ongoing Benefit
Administration activities in 22/23, 23/24 and 24/25 when it is
now expected that the full migration of working age Housing
Benefit caseload to Universal Credit will be complete.  Monies
will be used to implement the recommended changes from
the recent Revs and Bens BPR (£50,000), build resilience
including staff overtime, outsourcing of Housing Benefit
processing during the transition and cover casual staff for the
Universal Credit migration (£20,500). Monies also set aside for
additional works to the value of £40,000 with the software
suppliers around enhancing the Revs and Bens system,
automating processes and transitioning customers to use
digital gateways to contact the service.
90,410 0 0
096
Financial Services Flexible Funding for Supporting
People while at Tier 4 COVID
167,983 91,626 76,357 COVID-19 Funding from SG to strengthen local authority responses to
meet emerging needs and support people in their
communities struggling with the restrictions and guidance at
all protection levels re COVID, particularly those at risk through
health and social inequalities. This support could cover the
same types of support.  In June 2021 the Council agreed to
support 20 projects led by a range of Council officers, officers
from the HSCP and members of the third sector to deliver wide
ranging support across our region.  A report will be presented
to members in due course.
76,357 0 0
097
Financial Services Pandemic Support Payments (CTR -
Admin)
51,968 0 51,968 Unspent Grant Administration funding associated with Scottish Government
schemes to issue monies to CTR recipients. Provide additional
staffing to support the recovery from backlog of Council Tax
administration caused by Pandemic Support Payment process,
further administration duties related to LACER fund and also to
support any further Scottish Government funding initiatives
that occur during 22/23 and 23/24.
51,968 0 0

Page 46

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
098
Financial Services Financial Systems 114,000 80,252 33,748 Unspent Budget To fund the completion of the implementation of the Oracle
Fusion Financial Management System, a software update for
cash receipting to ensure card payments can still be taken and
the procurement and implementation of a new system to
manage the requirements of the IFRS16 Leases accounting
standard.
33,748 0 0
099
Financial Services Accounting and Budgeting Team
Resilience
95,000 64,336 30,664 Unspent Budget To fund the implementation of a new staffing structure in
2022/23 as agreed at ELT on 12 April 2022 which has been
implemented.  The residual funding is being used to meet the
costs of ongoing professional accountancy  training over the
period 2022/23 to 2026/27
16,664 14,000 0
100
Financial Services CIPFA 32,530 8,490 24,040 Unspent Budget CIPFA Training - To fund the professional training costs for staff
undertaking the CIPFA professional accountancy qualification.
6,000 18,040 0
101
Financial Services Self Isolated Support Grant 16,000 13,617 2,383 COVID-19 Unspent admin funding for processing Self isolation Support
Grants.  Scheme now closed, balance of funding should be
used to support vulnerable customers affected by the Cost of
Living Crisis with Crisis Grants
2,383 0 0
102
Roads & Infrastructure Roads Reconstruction Programme 2,653,000 1,286,000 4,839,000 6,206,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the
Council committed to additional investments.  For Roads
Reconstruction, continuing a multi-million investment
programme over the life of this Council by providing additional
funding (£2.653 with £0.887m from COVID and £1.766m from
unallocated general fund at 31/03/22) to maintain and
improve Argyll and Bute’s rural, remote, island and urban
roads network, to guarantee an overall Roads Reconstruction
Budget of £8m for 2022/23.  Capital expenditure incurred in
2022/23 with draw down in 23/24. At the Council Budget
meeting on 23 February 2023, the Council committed to
augmenting overall allocation for the roads repair and
maintenance programme with additional funds to bring up to
£8m total investment for 2023/24 and 2024/25.
5,164,000 1,042,000 0
103
Roads & Infrastructure Piers and Harbours 1,642,811 0 1,642,811 Piers and
Harbours
Investment Fund
Funding generated through increased harbour fees and
charges in order to generate funds to meet the costs of the
prudential borrowing required to develop and maintain the
Council's harbour assets and infrastructure. Under the
Harbours Act 1964, section 42, as a statutory harbour
undertaker, the Council must prepare an annual statement of
accounts relating to the harbour activities and any associated
activities for each harbour for which it is the statutory harbour
authority. This requirement cannot be satisfied by the
preparation of a statement of accounts which relates to other
Council activities in addition to harbour activities.  In essence,
any surplus in the Piers and Harbours budget must be
reinvested in the marine asset and reflected in accounts.
0 1,642,811 0
104
Roads & Infrastructure Waste Variation Monies 1,492,997 0 1,492,997 Unspent Budget This will be used to fund/part-fund various waste
infrastructure projects that will support the council’s
compliance with the 2025 ban on the Landfill of Biodegradable
Municipal Waste, including the development of landfill cell
construction works at Gartbreck.  £640k for Capital works on
Gartbreck completed in 2022/23, reserve will be drawn down
for this in 2023/24.
1,066,000 426,997 0

Page 47

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
105
Roads & Infrastructure Footpath improvements 750,000 750,000 Previous Council
Decision
At the Council Budget meeting on 23 February 2023, the
Council committed to providing additional funding for footpath
improvements across Argyll and Bute.
750,000 0 0
106
Roads & Infrastructure Active Travel 500,000 0 500,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the
Council committed to additional investments.  For Active
Travel £0.500m for further improvements for footpaths and
pavements and supporting safer routes to schools across Argyll
and Bute. Requests that officers bring forward a report setting
out scheme proposals to the Environment, Development and
Infrastructure Committee.
370,000 130,000 0
107
Roads & Infrastructure Vehicle Replacement 499,260 0 499,260 Fleet - Timing
Delay
Timing delay in fleet replacement causing one-off saving.  
Vehicles purchased and received in 22/23, draw down to
capital will be processed in 23/24.
499,260 0 0
108
Roads & Infrastructure 3G pitches / Tarbert Sports Pitches 427,286 52,264 375,022 Unspent Budget In November 2018, the Council agreed to a maintenance
funding package to be progressed for a number of 3G pitches
including Tarbert. This funding will provide an estimated 6.5
years’ worth of ongoing maintenance up to 2025-26. 
87,736 287,286 0
109
Roads & Infrastructure Street Lighting 300,000 0 300,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the
Council committed to additional investments. For Street
Lighting, £0.300m to deliver a programme of street lighting
column replacement and improvement across Argyll and Bute,
prioritised based on condition, with funding for at least 260
lighting columns.  Expenditure in 22/23, draw down in 23/24.
300,000 0 0
110
Roads & Infrastructure Waste Strategy 363,000 118,443 244,557 Unspent Budget To fund/part-fund various waste projects that will support the
council's compliance with the 2025 ban on the Landfill of
Biodegradable Municipal Waste. 
128,999 115,558 0
111
Roads & Infrastructure Waste Management 256,753 27,251 229,502 Unspent Budget Will be used towards long term waste management
strategy/model, including but not limited to scoping work for
the creating of a waste transfer station at Helensburgh.
135,000 94,502 0
112
Roads & Infrastructure Green Transport Initiatives 400,000 260,000 140,000 Unspent Budget At the Council meeting on 27 February 2020, it was agreed to
input £400k in Green transport, investment in footway and
cycle path maintenance supporting the healthy wellbeing and
green agenda.  Spend has been delayed due to COVID and this
will be taken forward in 23/24. £260k Footways Reconstruction
programme now spent and will be drawn down against capital
programme during 23/24. £140k Ardrishaig North Project will
be spent in 22/23 and drawn down in 23/24.
140,000 0 0
113
Roads & Infrastructure Climate Change 500,000 418,116 81,884 Unspent Budget At the Council meeting on 27 February 2020, it was agreed to
input £500k budget to mitigate the impacts of weather related
damage and climate change with specific emphasis on gully
cleaning and drainage improvements.  Spend has been delayed
due to COVID and the intention is to spend the funds on 2
Gully Motors plus staff over next 2 years. Vehicles have been
received and budget will be drawn down to cover their cost.
The remaining budget will be used towards running the
vehicles.
81,884 0 0
114
Roads & Infrastructure Parking Grant 50,013 0 50,013 Unspent Grant Grant from Scottish Transport for the assessment of footway
parking required under the Transport (Scotland) Act 2019. 
Assessment criteria from the Scottish Gov which will take
approx 12 months to complete throughout 23/24.
50,013 0 0

Page 48

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
115
Roads & Infrastructure Mercury Abatement - Crematorium 42,819 0 42,819 Unspent Third
Party Contribution
Phase 3 of the Cardross Crematorium works includes raised
flooring for DDA compliance together with upgrades to fire
doors. Works estimate circa £73k. The works include new fire
exit doors to meet compliance and the raising of the floor level
in the arch opposite the main entrance, the works include
ensuring the book of remembrance is readily accessible. Work
commenced 2020/21 and property have advised remaining
work will be completed in 2022/23.  Phase 1 and 2 complete,
Phase 3 to commence during 23/24.
42,819 0 0
116
Roads & Infrastructure Amenity Services introduction of
management information system
28,099 0 28,099 Unspent Budget Delay with introduction of amenity time recording system due
to increased costs.  Discussions ongoing to find alternative
cheaper solution.  The software/system being introduced by
HR/Payroll during 2023-24 offers a time-recording facility. 
Although not included in the current HR/Payroll spec, once the
new system is up and running, the proposal would be to
investigate the time-recording system to see if viable for
amenity time recording purposes.
28,099 0 0
117
Roads & Infrastructure Bin Replacement Programme 100,000 82,185 17,815 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the
Council committed to additional investments - £0.100m in
Argyll and Bute’s litter bin replacement programme and
infrastructure, providing almost 200 new/better bins across
the area where required due to condition/need and with a
focus on town centres and prominent locations, to support
cleaner communities.  Requests that officers explore options
for use of new and innovative litter disposal solutions for
future consideration.  The bulk of the spend was incurred
during 2022-23 with the remaining balance to be spend early
in 2023-24.
17,815 0 0
118
Roads & Infrastructure Hermitage Park Pavilion 4,327 0 4,327 Hermitage Park The Hermitage Park regeneration project has a significant
investment from the Heritage Lottery Fund (HLF) which has a
requirement to have a 10 year Management and Maintenance
Plan.  This will be partly funded by existing Council revenue
budgets but should also be supplemented by any additional
income which can be generated from park activities.  Part of
the HLF conditions are that all income generated by the park
should be retained to support the Management and
Maintenance Plan and a result of this requirement, any
unspent income generated by the park is retained for future
years requirements.
4,327 0 0
119
Roads & Infrastructure Kintyre Recycling Redundancy Costs 36,000 21,511 14,489 0 Unspent Budget To fund redundancy costs associated with Kintyre Recycling.
Remaining balance not required released back to the general
fund.
0 0 0
NON DEPARTMENTAL
120
Non Departmental Strategic Housing Fund 6,591,173 1,574,261 5,016,912 Strategic Housing
Fund
Accumulation of Council tax collected from the second homes
discount on properties is earmarked as part of the Strategic
Housing Fund balance.
2,727,410 2,289,502 0
121
Non Departmental Further Capital pressures per budget
pack February 22
3,900,000 0 3,900,000 Capital Projects As agreed at Council on 24 February 2022, a provision for
Capital contract increases £3.900m. £1.133m currently
allocated to Campbeltown Flood Scheme with expenditure in
22/23 and draw down in 23/24.
1,133,000 2,767,000 0
122
Non Departmental Investment in Affordable Housing 3,300,000 0 137,000 3,163,000 Investment in
Affordable
Housing
Agreed at Council Meeting 11 February 2016.  This balance
reduces as the Loans to RSL balances are reducing.
0 3,163,000 0

Page 49

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
123
Non Departmental Asset Management Fund 2,115,394 65,478 2,049,916 Asset
Management
Investment
Agreed at Council Meeting 11 February 2016.  This fund has
been set up to allow the Council to invest monies where
relevant to generate a return that will be reinvested within
Argyll and Bute.  There are potential investment opportunities
in Colgrain, Kilmory and Oban Airport being explored
2,049,916 0 0
124
Non Departmental Redundancy Provision 1,731,826 153,800 1,578,026 Unspent Budget One-off re-profiling gain as a result of the loans fund review to
fund known liabilities/cost pressures as agreed at budget
setting meeting in February 2020. Future redundancies
provision.
500,000 500,000 578,026
125
Non Departmental Recovery and Renewal Fund 1,547,000 0 1,547,000 COVID-19 As agreed at Council on 24 February 2022, Recovery and
Renewal Fund £1.547m.  This is provision for future recovery,
regeneration and renewal, as well as any future pressures
which may arise following the Covid-19 pandemic through a
dedicated Recovery and Renewal Fund.  Commitments have
been made against this fund as follows: Levelling up bid costs
£0.150m, Scotland Loves Local overspend £0.037m and
Rothesay Pavillion £1.360m.
1,547,000 0 0
126
Non Departmental Allocated to Capital Plan 6,019,775 5,249,775 725,000 1,495,000 Previous Council
Decision - Other
Allocated to capital plan.  £8.240m agreed 22 February 2018
and a further £2.408m agreed as a budgeted surplus from the
2018-19 budget. 
Further £3m agreed by the Council at the budget meeting in
February 2021 from unallocated general fund. 
Further £2.975m transfer to Capital agreed as part of the
21/22 Revenue Budget agreed February 2021. 
Further £0.725m allocated February 2023 from the unallocated
general fund. 
Future draw downs as per planned capital expenditure over 23-
24 and 24-25.
592,000 903,000 0
127
Non Departmental Regeneration and Economic
sustainability in Lochgilphead and
Tarbert.
2,270,579 811,000 1,459,579 Lochgilphead and
Tarbert
Regeneration
Agreed at Council Meeting 11 February 2016. Lochgliphead
Front Green Project (Capital) has now commenced with
drawdown expected to be £811k in 22/23 for expenditure
incurred in 21/22 and remainder in 23/24 for expenditure in
22/23 for Lochgilphead Front Green and Ardrishaig North. 
£289k unallocated.
1,141,000 318,579 0
128
Non Departmental Supporting Organisational Change 1,587,950 161,876 1,426,074 Unspent Budget One-off re-profiling gain as a result of the loans fund review to
fund known liabilities/cost pressures as agreed at budget
setting meeting in February 2020 - Provision to support
organisational change (£0.500m)
It is proposed to supplement the existing 'Supporting
Organisational Change' reserve first established in February
2020 with a further £1.2m to enable the Council to deliver
longer term, more fundamental, service redesign which will
require funding to support the identification and delivery of 
solutions that take account of future requirements and
community engagement and deliver longer term revenue and
benefits to the Council
200,000 1,226,074 0
129
Non Departmental Capital Cost Pressures 2,000,000 718,000 1,282,000 Capital Projects As agreed at the Council Meeting on 25 February 2021. 
Allocation of COVID funding to Capital Cost Pressures.  
Remaining budget to be drawn down in 23-24 for expenditure
incurred in 22-23.
1,282,000 0 0
130 Non Departmental Underwriting development of
Rothesay Pavilion
1,000,000 0 1,000,000 Unspent Budget Funding to meet additional costs identified as necessary for
the refurbishment of Rothesay Pavilion.
0 1,000,000 0

Page 50

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
131
Non Departmental Inward investment Fund 783,015 118,350 664,665 Inward Investment
Fund
Agreed at Council Meeting 11 February 2016.  This fund has
been set up to generate economic and population growth
within Argyll and Bute. The aim is to encourage business and
people to set up and live in Argyll and Bute. The remainder of
this fund will be directed towards projects which support the
Rural Growth Deal.
391,508 273,157 0
132
Non Departmental Provision for Capital Contract
Increases
2,646,000 2,157,000 489,000 Capital Projects As agreed at the Council Meeting on 25 February 2021. 
Allocation of COVID funding to Capital Cost Increases £2.5m
with the amended value of £2.646m agreed at P&R on 14
October 2021.  Remainder of expenditure planned for 22/23
and will be drawn down in 23/24.
489,000 0 0
133
Non Departmental Loans Fund 385,279 0 385,279 Unspent Budget At the Council Budget meeting on 24 February 2022, Saving
FS01, a Loans Fund Management/Operational saving for 22/23
budget of £0.500m was agreed with at least £0.200m to come
from underspends in 21/22.  The underspend position for
21/22 is £0.385m and this earmarking is being released as a
saving to help bridge the 2023/24 budget gap.
385,279 0 0
134
Non Departmental Information Management 372,032 36,314 335,718 Unspent Budget To support a number of initiatives in respect of improving the
Council's information management in line with the
transformation agenda and increasing the pace of change as
outlined in the BV Review.  The remaining balances within the 
planned initiatives are as follows: Estates Survey work £13k,
Digitalisation of Title Deeds £92k, document management and
workflow system for Planning, Building Standards and
Environmental Health £57k and a balance of funding to explore
information management solutions in a strategic and coherent
way £210k
0 0 335,718
135
Non Departmental Capital pressure 257,000 0 257,000 COVID-19 Pressure identified on the 20/21 COSLA COVID costs
spreadsheets - requires to be earmarked to be drawn down
when required against the Capital Plan
257,000 0 0
136
Non Departmental Levelling up Fund bids per P&R
February 22
150,000 0 150,000 COVID-19 As agreed at Policy & Resources committee on 17 February
2022, an allocation of  up to £0.150m to support Levelling Up
Fund bids
150,000 0 0
137
Non Departmental Spend to Save Route Optimisation
Software
100,000 0 100,000 Unspent Budget One-off re-profiling gain as a result of the loans fund review to
fund known liabilities/cost pressures as agreed at budget
setting meeting in February 2020 -  Spend to save route
optimisation (£0.100m) which will be spent over  2023/24.
100,000 0 0
138
Non Departmental Engagement with Hub North re
provision of services for olders adults
and vulnerable people across Argyll
and Bute
0 0 0 100,000 100,000 Previous Council
Decision
At the Council budget meeting February 23, an allocation of
£0.1m from the Unallocated General Fund balance for the
Health and Social Care Partnership to engage, in partnership
with the Council, with Hub North to develop a strategic
business case in relation to the provision of services for older
adults and other vulnerable people across Argyll and Bute.
100,000 0 0
139
Non Departmental Rural Growth Deal Programme Office 273,919 182,458 91,461 Previous Council
Decision
Agreed at Council meeting February 2021.  Following the
signing of the Heads of Terms Agreement for Argyll and Bute’s
Rural Growth Deal in February 2021 and, to secure maximum
potential from this £70m investment in the region, invests
additional funding to drive forward the progression of Argyll
and Bute’s Deal and to support the Deal’s associated
programme, business case development and project
management.
This earmarking includes £151,733 that was sitting under Rural
Resettlement fund as at 31 March 22 but was merged into this
line going forward
91,461 0 0

Page 51

Ref Service Description Amount
Earmarked at
31 March 2022
Actual Spend 
2022/23
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2022/23
Closing
Balance at 31
March 2023
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2023/24
Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
140
Non Departmental CHARTS 75,000 70,000 75,000 80,000 Previous Council
Decision
As agreed at Council on 24 February 2022, investment in
CHARTS £0.075m.  To support the organisation in delivering
targeted support, in communities, to the culture, arts and
heritage sector as part of its plans to contribute to overall
economic recovery.
At the Council Budget meeting on 23 February 2023, the
Council committed to £0.075m one-off investment in CHARTS
in response to an external funding request
80,000 0 0
141
Non Departmental Community Resilience Fund 76,447 0 76,447 Previous Council
Decision
Fund established in 2012/13 to be spent over more than one
year. Fund reduced at the Council meeting on 11 February
2016
0 76,447 0
142
Non Departmental COVID Cost Pressures Beyond
2021/22
370,000 326,000 44,000 0 COVID-19 As agreed at the Council Meeting on 25 February 2021 (£2.5m) 
with the value reduced to £0.370m based on more up to date
projections at year end 2021/22.  Allocation of COVID funding
to projected 22/23 Revenue Cost Pressures with the remaining
balance being released to the general fund.
0 0 0
143
Non Departmental Investment in HubCo 491,791 0 491,791 0 Asset
Management
Investment
It was agreed at the Council meeting February 2016 that the
investment in HubCo be supported. The earmarking has been
updated to show the actual investment costs. 
During 2022-23, it was agreed that this can be returned to the
General Fund as on further review it is being dealt with as an
investment through the Treasury cash position.
0 0 0
144
Non Departmental Unallocated Admin Support Grant 411,285 0 411,285 0 COVID-19 Funding to support the delivery of the Business Grants to local
businesses, partially used during 20/21 and 21/22. The unused
balance has been returned to the General Fund in 2022/23.
0 0 0
145
Non Departmental Oban Library Leased Property 25,069 0 25,069 0 Previous Council
Decision - Other
Capital expenditure on a Leased Property - no planned
expenditure in 2022/23 or subsequent years therefore can be
returned to the general fund.
0 0 0
146
Adult Services See Hear Funding 13,658 0 13,658 Scottish
Government
Initiatives
Funding has been received specifically from the Scottish
Government to support activity around implementation of the
See Hear recommendations and the identified priorities of
individual Sensory Partnerships. No plans for spend in current
financial year, funds will be used in the next two years in
accordance with the See Hear plan and Argyll and Bute's BSL
Local plan.
13,658 0 0
147
Children and Families Criminal Justice Transformation
Funding
39,890 0 39,890 Unspent Third
Party Contribution
Additional funding from SG to fund redesign work within
Criminal Justice. Funds to be pooled with equivalent additional
funding received by our CJ Partnership Partners to fund a
transformation and development project across the three
partner areas.
39,890 0 0
88,990,793 33,893,036 1,124,019 7,080,000 61,053,738 0 0 39,782,289 20,357,705 913,744
SOCIAL WORK