ARGYLL and BUTE
STRATEGIC HOUSING INVESTMENT PLAN
2024/25 - 2028/29

Page 2

1 
CONTENTS 
SECTION PAGE      
INTRODUCTION 3
1. The Strategic Framework 5
2. Stakeholder Consultation 7
3. Prioritising the Programme 12
4. Delivering the Programme: Mitigating Risks and Resolving
Development Constraints
17
5. Resourcing the Programme and the Council’s Contribution 21
6. Empty Homes  25
7. Child Poverty and Fuel Poverty 27
8. Specialist Provision including Wheelchair Habitable Housing 29
9. Gypsy/Traveller Sites 32
10. Homelessness/ Rapid Rehousing Transition Plans 33
11. Buybacks, Second-Hand Acquisitions and Off-Shelf 34
12. Worker Accommodation  35
13. Update from the Previous Ship 36
14. The Revised Programme 38
15. Monitoring, Review and Impact Assessments 43     
CONCLUSION 44   
APPENDICES 
Appendix 1 Individual Open Market Purchases January 2022 45
Appendix 2 SHIP development across Argyll & Bute: Projects in core
programme 2024-2029
46

Page 3

2 
Argyll and Bute Council area  
Helensburgh
& Lomond 
Bute &
Cowal 
Mid-Argyll,
Kintyre & Islay
Oban, Lorn &
the Isles 
MULL
Tobermory
Oban
Campbeltown
Bowmore
Rothesay 
Helensburgh Lochgilphead 
COLL
TIREE 
COLONSAY
GIGHA
IONA
BUTE
ISLAY
JURA

Page 4

3 
INTRODUCTION 
The Strategic Housing Investment Plan (SHIP) is a key operational document
produced annually by the local authority which identifies priority housing projects to
support the delivery of local and national strategic housing targets, to increase the
supply of housing. 
The SHIP is directly informed by a number of strategic policy documents, primarily the
Local Housing Strategy (LHS) and its associated policies, which details the strategic
policy approach of the council and its partners to deliver housing services across the
area to meet identified needs. 
As per the Scottish Government guidance, the SHIP is the key document for
specifically identifying: 
1. Proposed strategic affordable housing projects which require Scottish Government
Affordable Housing Supply Programme funding support. 
2. Proposed affordable housing projects which are to be provided without Scottish
Government Affordable Housing Supply Programme funding support. 
The focus of the SHIP is affordable housing provision via new build, replacement,
rehabilitation, or re-modelling. “Affordable housing” in this context refers to
accommodation made available at a cost below full market value to meet an identified
need and includes: 
 Social rented housing. 
 Subsidised low-cost housing for sale (discounted, shared ownership or shared
equity);
 Low-cost housing without subsidy (entry level housing for sale); and
 Mid-market rental housing provided by social landlords.”
(Guidance on the Preparation of SHIP, Scottish Government, July 2016) 
This SHIP plan covers the five years from 2024/25 to 2029/29, and details how it will
deliver the LHS priorities and outcomes through a five-year strategic investment
programme. 
Argyll and Bute Council is committed to working closely with the Scottish Government,
local housing associations, community groups, and other key partners to increase the
effective supply of affordable homes across the area.  The SHIP plan reinforces the
council’s role as the strategic housing authority; informs Scottish Government housing
investment decisions; and the preparation of Strategic Local Programme Agreements
(SLPAs). 
Developed in consultation with key stakeholders this SHIP builds on the previous plan
published in 2022. The finalised SHIP was submitted to the Scottish Government in
October 2023 and approved by full Council in November 2023.

Page 5

4 
The SHIP narrative provides a context to the SHIP and includes the following: 
 A statement outlining the role the SHIP investment priorities plays in
delivering LHS outcomes.
 Details of stakeholder consultation undertaken in developing the SHIP;
 A summary of the project prioritisation framework;
 Prioritisation by house size;
 How the SHIP addresses duties placed on the council by the Islands
(Scotland) Act; and 
 The council’s investment priorities for housing in town centres
 A list of the risks and key issues constraining the delivery of the programme
and identifying the actions that are required to mitigate against these
constraints. 
 Using different construction methods to deliver SHIP projects.
 Resourcing the programme, including : 
 Details of how the council’s own resources, such as Council Tax on Second
and Empty Homes, support affordable housing delivery;
 Details of other funds that are supporting the delivery of affordable housing;
 Details of Developer Contributions that have been used to assist affordable
housing delivery; and 
 The role of the Housing Infrastructure Fund in delivering new affordable
housing;
 Details of any housing projects where funding has been or will be sought
from the Vacant and Derelict Land Investment Programme.
 A summary of the empty homes services and actions being taken by the
council to bring homes back into use.
 Aligning the SHIP programme with the requirement specified in the Argyll and
Bute’s Child Poverty Action Report.
 Details of specialist housing provision delivered over the SHIP period,
including wheelchair-accessible housing. 
 An outline of capital works undertaken on Gypsy/Traveller sites and whether
funding has been sought through the Gypsy/Traveller Accommodation Fund.
 Outlining how the strategic housing priorities are aligned with Rapid
Rehousing Transition Plan priorities.
 A statement on the council’s approach to buybacks, second-hand
acquisitions and off-the-shelf purchases. 
 Details of progress towards delivery of the affordable housing supply
programme across all tenures by completions; 
 Detail any specific requirements for key worker housing and the actions that
the Council or Registered Social Landlord (RSL) partners will take forward
over the period of the SHIP;
 A summary of the projects in this SHIP. Full details of these projects can be
seen in the Scottish Government’s electronic system HARP (Housing And
Regeneration Programme)
 Details of how the SHIP will be monitored and reviewed including how the
SHIP programme impacts upon:
 Equalities and Socio-Economic Impact Assessment 
 Child Rights and Wellbeing Impact Assessment
 Health Impact Assessment 
 Islands and Communities Impact Assessment 
 Strategic Environmental Assessment

Page 6

5 
1. STRATEGIC FRAMEWORK 
Argyll & Bute Outcome Improvement Plan (ABOIP) 
As the overarching strategic document for local partners, including the council, the
Argyll and Bute Outcome Improvement Plan 2013-2023 (ABOIP) provides the high-
level context for a wide range of strategies, plans and policies, including both the Local
Housing Strategy and the SHIP. The ABOIP sets out the Community Planning
Partnership’s (CPP) vision for achieving long term outcomes for communities in Argyll
and Bute.  The overall objective of the plan is: 
“Argyll and Bute’s economic success is built on a growing population” 
To achieve the overall objective six long-term outcomes were identified: - 
1. The economy is diverse and thriving.
2. We have infrastructure that supports sustainable growth.
3. Education, skills and training maximises opportunities for all.
4. Children and young people have the best possible start.
5. People live active, healthier and independent lives.
6. People live in safer and stronger communities 
While the housing sector has a role to play in achieving all of these outcomes, the
provision of affordable new build housing, particularly the delivery of the SHIP,
primarily focuses on Outcome 2. 
The council and its partners have been reviewing and consulting on the new ABOIP
for 2024-2034 and the new draft document is expected in December 2023. 
Community Engagement has identified ‘housing’ as a continued priority and future
SHIPs will align with the priorities of new Local Outcome Improvement Plan. 
Local Housing Strategy (LHS) 2022/23 - 2026/27 
The investment programme and priorities set out in the SHIP are consistent with the
vision, aims and objectives of the LHS; and that these build on the latest Housing
Need and Demand Assessment (HNDA). Our strategic priorities and outcomes
continue to be ratified and supported by partners and stakeholders via the Argyll and
Bute Strategic Housing Forum. In 2022 the council published its new LHS which
covers a five-year planning period from 2022/23 to 2026/27. The LHS sets out our
core vision and underpinning this vision are four high-level outcomes:

Page 7

6 
The SHIP plays a key role in promoting the overall LHS vision and delivering on LHS,
particularly Outcome 1.   The Council produced a new HNDA in 2021, which was
approved by the Scottish Government. The council’s LHS housing supply target of
providing 1075 affordable homes from 2022/23 to 2026/27 (215 homes per year) is
significantly higher than the baseline HNDA estimate to take account of local and
national strategic aspirations for repopulation, economic recovery, and overall growth
throughout the authority area. 
In summary, the SHIP aims to deliver sufficient suitable and affordable new homes
to attract and retain young people and families, to support a sustainable and
thriving business sector, and to meet the needs of the elderly/ageing population,
and those with particular needs. 
 Potentially, up to 10% of the five-year provision could be for alternative
tenures such as shared equity; and
 10% should comprise some form of “specialist provision” including 5% which
should be fully wheelchair habitable. 
Scottish Government Priorities and Convention of the Highlands and Islands
(COHI) 
One of the Scottish Government’s priorities is to ‘support a more balanced population
across Scotland.’ To achieve this aim, the Scottish Government has developed a
strategy called- ‘A Scotland for the future: Opportunities and Challenges of Scotland’s
Changing population’ to ensure all areas have a more balanced population “so all our
communities can flourish”. 
1. HOUSING SUPPLY AND
PLACE MAKING
2. HOUSE CONDITION,
ENERGY EFFICENCY AND
POVERTY
3. SPECIALIST PROVISION
AND INDEPENDENT LIVING
4. HOUSING OPTIONS,
INFORMATION AND
SUPPORT
“Everyone in Argyll & Bute has access to a
suitable, high-quality home which is affordable
and located within a vibrant, sustainable and
connected community”
 Housing supply target 2022/23 to 2026/2027 is 1,450 units across all
tenures (290 per annum). 
 Affordable housing supply target 2022/23 to 2026/27 is 1,075  (215 per
annum)

Page 8

7 
The Scottish Government’s National Islands Plan aims to address population decline
and ensures a healthy, balanced population profile. In particular, the National Islands
Plan commits to supporting the repopulation of rural and island communities. 
A Ministerial Working Group was established in June 2023 to oversee the
development of a ‘Rural Delivery Plan’ within this parliamentary term. The aim of the
Plan is “showing how all parts of the Scottish Government are delivering for rural
Scotland. As well as policies on agriculture, land reform, marine, and our Islands Plan,
this will cover areas such as transport, housing, social justice, repopulation, digital
connectivity and economic development.”   
Housing to 2040 aims to deliver the vision for everyone in Scotland, including island
communities, by understanding and identifying what positive measures need to be
taken forward to address, promote and ultimately reduce inequality in housing
outcomes across all housing tenures by 2040 and build strong sustainable
communities. 
The Convention of the Highlands and Islands (CoHI) group was established to
strengthen alignment between the Scottish Government and member organisations in
order to support sustainable economic growth and to enable the exchange of ideas on
strategic issues affecting the people of the Highlands and Islands. Argyll and Bute
Council is a member of CoHI group and is participating in the pilot projects. The
Council has identified the following areas as repopulation zones: 
 Rosneath Peninsula 
 Kintyre (Tarbert to Southend)
 Coll and Tiree 
 Bute 
Three Settlement Officer Posts were established across Argyll and Bute, Highland,
and Western Isles Council. The posts were initially joint funded by HIE/ relevant local
authority for 12 months. These positions have been extended for one year through
joint funding between the Scottish Government and Local Authority. 
The aims of the Argyll and Bute Settlement Support Officer include: 
 Providing guidance and support to people wanting to remain/ relocate.
 Gathering information on the barriers to population retention and growth. 
 Support the development of projects and initiatives to help address population
decline. 
2. STAKEHOLDER CONSULTATION 
As outlined in previous SHIPs, the preparation of this plan, as well as the planning
and delivery of individual projects, remains a continuous process. The SHIP reflects
a strong collaborative approach with Registered Social Landlords (RSLs, or housing
associations), the Scottish Government, communities, developers and other
stakeholders.

Page 9

8 
Key strategic partners include: 
 The Scottish Government: More Homes Scotland Division
 Argyll & Bute Council
 Argyll & Bute Health & Social Care Partnership
 Argyll Community Housing Association
 Fyne Homes Housing Association
 Dunbritton Housing Association
 West Highland Housing Association
 Link Group Ltd
 Bield Housing Association
 Trust Housing Association
 HMNB Clyde/ MOD 
 Loch Lomond & Trossachs National Park
 Rural Housing Scotland 
 Communities Housing Scotland
 Highlands & Islands Enterprise
 Veterans Housing Scotland
 Scottish Water
 Scottish and Southern Energy Networks
 Scottish Power Energy Networks
 Home Energy Scotland
 ALIenergy 
At local level, on a site-by-site basis, RSLs and Council officials continue to liaise
closely with private developers, local landowners, local community groups and
development trusts, and a range of other stakeholders to negotiate, facilitate, enable
and deliver viable projects within the context of the LHS and the framework of the
SHIP. Updates are also tabled at local Area Committee’s. Community representatives
and residents are routinely consulted regarding specific projects, sites and
settlements. 
The Argyll & Bute Strategic Housing Forum, comprising a wide range of key
partners, the Strategic Housing Forum constitutes the overarching Housing Market
Partnership with ultimate responsibility for overseeing the implementation and
monitoring of the LHS and the SHIP; and is chaired by the Council Leader. The
Strategic Housing Forum is also responsible for making appropriate recommendations
to Council Members and lobbying the Scottish Government regarding housing issues
in Argyll and Bute. The Terms of Reference for the Forum, as the formally constituted
local housing market partnership within Argyll and Bute, were reviewed and agreed in
September 2022 and is available on request.
The SHIP Officers Development Group - In addition to regular programming
meetings between the council, the Scottish Government and individual RSLs, a
dedicated SHIP Officers Group continues to bring partners together on a quarterly
basis to address and progress operational development matters which are then
reported to the overarching Strategic Housing Forum.

Page 10

9 
Community Housing Network Group- Argyll and Bute Council, as the strategic
housing authority, recognises the importance of community groups and their role in
delivering affordable housing. The Community Housing Network Group was
established to improve communication and partnership working. The group exists to
fulfil the following aims: 
 Provide a forum for community groups interested in developing affordable
housing to come together and discuss important aspects of their work to deliver
housing solutions in their communities;
 Provide guidance to the community groups on relevant areas of policy and
practice; 
 Facilitate external speakers on areas of subject expertise relevant to the group
members; and
 Encourage sharing complex issues between members, understanding that no
one organisation has all answers. 
Many of the community groups within the network have successfully attracted funding
from the Rural and Islands Housing Fund or the Scottish Land Fund to provide
affordable housing. More details are outlined in Section 5 and 14. 
Housing Delivery Group – As well as our effective strategic partnerships, to help
address the acute shortage of housing across all tenures, the Council have
established an internal working group which is focusing on:   
 Identifying existing, and new housing sites that can make potential strategic
contributions to all tenure housing supply;
 Identify key barriers/constraints to development and possible solutions to help
deliver these sites;
 Engage with key housing stakeholders to identify solutions and improve
collaboration;
 Identifying solutions to effectively tackle market failure in the supply of private
new build;
 Consider innovative approaches and direct intervention including radical
delivery models such as Council funded development and property purchase;
 Consider any policy measures that could be employed by the council or
government to address housing market failure. 
Rural Growth Deal (RGD) Housing Sub-group - The Rural Growth Deal housing
sub-group allows partners to contribute to the housing elements within the RGD. The
RGD housing proposals are to: 
 Construct housing for sale;
 Place rural burdens and planning conditions on homes financed by the RGD
to ensure they are used as principal homes for occupants; and
 Develop proposals relating to the delivery of worker accommodation.

Page 11

10 
Argyll and Bute Child Poverty Action Group - The Argyll and Bute Child Poverty
Action Group recognises that it is vital that the council, Health Board, the third sector
and communities work together to tackle child poverty. Housing is an essential
component in tackling child poverty; and the service has been represented in the group
since its inception. The SHIP programme will deliver housing investment, enabling
some families to be allocated affordable, energy-efficient homes. 
Health and Social Care Partners 
The Council continues to work closely with the Health & Social
Care Partnership (HSCP) at all levels. The HSCP’s current
three-year Joint Strategic Plan was launched in 2022,
incorporating a revised and updated Housing Contribution
Statement (HCS) which outlines the essential role that housing
plays in supporting and maintaining independent living and the
health and wellbeing of residents. The SHIP has a direct and
significant contribution to make to this outcome. 
“People in Argyll and Bute will live longer healthier
independent lives”    
To realise this vision, people need access to appropriate housing models, and support
from care staff to enable them to live at home or in a homely setting. The balance
between care in residential and community settings has shifted considerably over
recent years towards looking after people at home. The Strategic Plan estimates that
52.8% of those aged 65+ with long term care needs are looked after at home with
approx. 10+ hours of home care per week1. The provision of care at home can be
restricted by staff numbers and it has been identified that a lack of affordable housing
can be a barrier to attract and retain health and social care staff. The SHIP and Rural
Growth Deal will provide homes which could help attract health and social care staff
to the area. In addition, the delivery of suitable specialist provision via the SHIP
programme will be critical to enabling people with needs to live independently in their
own home. 
A dedicated Housing Occupational Therapist (OT) facilitates the close partnership
between the council, RSLs and the HSCP. This includes reviewing the circumstances
and requirements of households with particular needs, developing a better
understanding of the accommodation and support needs of wheelchair users, and
facilitating early interventions, particularly concerning adaptations and property
layouts and design.  The Housing OT and relevant HSCP Officers participate in the
SHIP Operational Group and the Strategic Housing Forum to identify specific new
build requirements and inform targets for wheelchair accommodation. 
The Council Housing Services also fund a dedicated Mental Health/Addictions
Housing Practitioner. This post is focused on supporting the delivery of the Rapid Re-
housing Transition Plan and supporting households; further enhancing the strategic
and operational links between housing, health and social care. 
1 Health and Social Care Joint Strategic Plan 2022-25

Page 12

11 
Community Engagement - The council has enhanced its approach to localised
housing need and demand assessment, building on a number of years’ experience
with community councils, development trusts, local study groups, green belt groups,
tenants and residents’ associations, and various other local bodies across mainland
Argyll and throughout the Islands. The Community Housing Assessment Tool (CHAT)
is a detailed resource for local communities and third-party support agencies to carry
out surveys, stakeholder engagement, and data analysis, with the support of council
staff, in order to assemble “high quality, fit for purpose” evidence base required to
secure public funding and help to deliver practical housing solutions[1]. 
HMNB Clyde / MOD engagement- As reported in previous SHIPs, the Strategic
Delivery and Development Framework (SDDF) is established between the Council and
HMNB Clyde to achieve maximum benefit for the base the wider community as a
consequence of the proposals for increasing the naval presence at Faslane. 
A key issue in relation to housing and potential requirements for the SHIP was the
implementation of the Future Accommodation Model (FAM), which the MOD piloted
from September 2019 to March 2023. The way people live, and work is changing, and
the FAM reflected this, giving more choice to more Service personnel and their families
over where, how, and with whom they live.   The FAM pilot has now ended and a
review of the evidence is underway which will take into account accommodation
measurements cut across a wide section of issues from accommodation type,
standard, location and preference, all of which will be measured against the existing
MOD housing stock nationwide. Whilst personal were not required to disclose the
location of accommodation during the FAM pilot, the anecdotal evidence received was
that service personnel were not necessarily looking or secured accommodation in the
Argyll and Bute area.  Early indicators from the Faslane pilot include:  
 Over 600 personnel benefited from the monthly FAM Core Payment which allowed
them to offset the cost of owning a home away from base while they lived in Single
Living Accommodation during the week;
 10 serving personnel applied to buy a home in the surrounding areas; and 
 Approx. 100 personnel applied to enter into the Private Rental Sector. Although
were made and approved, this does not mean that they will have found or moved
into a private rented property. 
We will monitor the outcomes of the FAM pilot review and incorporate any proposed
changes or alternative models into futures SHIP’s to ensure that there is sufficient and
suitable capacity within the local housing system to address any increased demand. 
The council carried out a dedicated in-house study of the particular needs of veterans
and serving military personnel to inform the HNDA in 2021 and LHS in 2022. This
involved engagement with local and national organisations such as Veterans Housing
Scotland and Poppy Scotland, among others. Veterans Housing Scotland are key
partners of Strategic Housing Forum. 
hnda_technical_paper_09_-_veterans_and_armed_services.pdf (argyll-bute.gov.uk) 
[1] The Argyll and Bute Community Housing Assessment Toolkit (CHAT) is available on demand from Council
Housing Services. See contact details on the final page of this Plan.

Page 13

12 
Wider Stakeholders, Local Business, and Economic Development - Increasingly,
given the overarching strategic aims, economic development and regeneration
partners are key associates in the SHIP and LHS process. Other stakeholders and
strategic partners are engaged on an ad hoc basis as appropriate. 
Housing Emergency - Wider Engagement - The Council declared a housing
emergency in June 2023 due to the shortage of housing to meet demand in the area.
This was driven by a complex range of issues including increasing house prices and
rents, reducing household incomes, rising construction costs, a decrease in new
homes being built, a shrinking private rented sector, increase in demand for worker
accommodation, and an ageing population. There is no single solution to these issues
and the Council will continue to work with a wide range of local partners to programme
a broad range of activities, in the short and long term, to target action where it is
needed most. 
A Housing Summit is being held in November 2023 which will bring together a range
of delivery partners, housing organisations, community stakeholders, and businesses
to debate, prioritise, and programme solutions to increase the supply of housing.
Ahead of the Housing Summit we have launched two surveys, one for local residents
and another for businesses to identify emerging issues and gain wider feedback and
ideas on how the housing emergency should be tackled. There will also be pre-
engagement workshops with stakeholders on key themes to identify barriers and to
help define potential delivery options and interventions. 
3. PRIORITISING THE PROGRAMME 
The SHIP has a clear and transparent framework for prioritising projects to be
delivered. Investment is targeted at Housing Market Area’s (HMA), communities and
settlements where the HNDA has identified the most acute housing pressures. These
priorities recognise the importance of investing in smaller, fragile rural communities as
well as larger urban areas. The areas have been identified through consideration of: 
 the relative and absolute pressure on the existing affordable housing; 
 the ability to meet the need in the wider housing market area;  
 deliverability (site ownership, infrastructure or planning constraints, etc.);
 the council’s strategic priorities e.g potential contribution to population growth and
economic growth. 
Given that localised “hotspots” or pressured areas may still be masked within the wider
geographic HMAs, a further refinement of the evaluation process is also required at
the localised settlement (or letting area) level to reflect the complex rural and island
geography of Argyll and Bute. Therefore, the council continues to employ the following
key indicators: -

Page 14

13 
TABLE 1: Key Indicators/Evidence Base 
Prioritisation by Housing Need – 
Dunbeg remains a key development priority for the Council, although the SHIP has
several other projects in the Oban and Lorn HMA. 
Strategically, Helensburgh & Lomond is also a high priority in terms of need and
potential growth opportunities. The Helensburgh Golf Club housing development is
a key site and other opportunities in the area are being explored.   
The LHS concluded that there is high levels of housing need and demand across the
local authority area particularly on the Islands. Small-scale developments could
significantly and positively impact the Atlantic Islands. 
Analysis suggests that all housing market areas in Argyll and Bute are experiencing
significant increases in housing need and demand. 
The 2021 Mid-year population estimates by the National Records for Scotland
identified Argyll and Bute as the 6th fastest growing local authority, with the
population growing by 0.9% from 2020-21, which exceeded the ambitious LHS
growth target of 0.5%. The Council continually monitors pressures in each of HMAs
and will modify investment priorities accordingly. 
Prioritisation by Tenure – The majority of the SHIP programme will deliver houses
for social rent; however, alternative affordable tenures such as shared equity, other
low-cost home ownership options or below-market rent will be considered on a site-
by-site basis in line with local market conditions and needs, and actively encouraged
where appropriate, subject to a robust business case being made.
Criteria Indicator/Evidence
Identified need  HNDA & local updates – total shortfall in affordable housing.
Pressure ratios  CHR - waiting list applicants per available let on annual basis.
Homeless
Pressure  
HL1 statistics - applicants & time to close cases; temporary
accommodation; % of RSL lets to homeless cases.
Social stock
levels
Proportion of existing RSL stock to total number of dwellings on
Council Tax Register.
Wider 
Strategic 
Fit
Synergies with LDPs; economic development plans or
regeneration initiatives; the local improvement plan; and the
primary objective of reversing population decline.
Specialist
Provision 
HNDA/CHR/Health & Social Work caseload – total shortfall for
special needs accommodation & evidence from waiting lists or
bespoke research.
Risk/
Deliverability
Satisfies key development criteria (site ownership; planning
consent; resourced; infrastructure constraints; contractor
capacity). Early liaison with planning remains critical.
Affordability (of
proposed rent)
Compared to Scottish Government benchmarks and other RSL
rents; as % of LHA; and as % of local household incomes.

Page 15

14 
Prioritisation by Size – The HNDA and the HOMEArgyll common housing register
identify that the most significant demand continues to be for one and two-bedroom
properties; hence, the SHIP will continue to promote the delivery of smaller
properties. As of April 2023, 59% of the active waiting list applicant’s required 1
bedroom accommodation, 25% require two bedrooms, while 11% required three
beds and 5% required four or more bedded properties. 
Although waiting list demand for larger properties is lower, the HNDA process
identified demand for larger, family-sized accommodation. “Bright Start, Bright
Future” by the Scottish Government identified larger families as one of the vulnerable
family types which are more likely to experience child poverty. The council is
committed to addressing child poverty, and hence the SHIP partners will consider
economically viable options, to deliver larger homes where there is a specific need,
including private acquisitions and off-the-shelf properties. (See section 11). 
Prioritisation by Particular Needs – Specialist housing provision is often required
for:
 those who have impairments such as cognitive, physical, sensory
developmental or a combination of impairments;
 older people with mobility or other health care needs;
 those with mental health conditions. 
To provide suitable accommodation for those with disabilities/ impairment and the
ageing population, the LHS specifies a target of 10% of new build should be purpose
designed as specialist provision to suit households with medium to high-level
particular needs. 
As far as possible, all general needs new builds are designed to the minimum
lifetime, Housing for Varying Needs Standards, to maximise the accessibility for
residents whose circumstances and needs will change over time. 
In addition, the extent and nature of the future ageing population, for instance, will
necessitate strategic investment in developing and delivering housing-based care,
support and aids, and adaptations. To this end, the council has developed a more
cohesive partnership with the Integrated Health & Social Care body to ensure that
the SHIP process is fully aligned with the health and social care integration agenda
and other relevant plans such as the “Keys to Life” strategy for persons with learning
disabilities, the Integrated Children’s Services Plan, the refreshed national housing
strategy for Older Persons published in August 2018, “Age, Home and Community:
the next phase”; and the Fairer Scotland for Disabled People strategy published by
the Scottish Government in 2016; among others. Further refinement of the
wheelchair housing targets in line with the Scottish Minister’s directive is set out in
Section 8 of this plan. 
The finer detail of the programme will be established through specification of suitable
type and size of accommodation for individual developments, taking into account the
needs of actual households on the waiting list, information gathered through local
housing need and demand assessments, and in consultation with HSCP co-
ordinated through the Housing OT.

Page 16

15 
Prioritising projects which align with the council’s overarching vision to grow
the population 
The Argyll and Bute Rural Growth deal aims to facilitate the delivery of a range of
housing tenures to provide market level housing for sale and also deliver
accommodation for workers.  The intension is to support business growth in the initial
pilot areas of Tobermory and Bowmore. The Islay and Mull SHIP projects will
complement the RGD housing proposals. 
Prioritising projects which improve town centres 
In addition, to supporting remote rural and island communities, the SHIP programme
also supports projects which improve town centres. This SHIP has the following town
centre projects on site: 
 Jeanie Deans, Helensburgh
 Eton Avenue, Dunoon 
SHIP projects should provide Rural and Island Proofing2 – the Council’s
Housing Service will continue to apply a policy of rural-proofing housing plans and
strategies to ensure the more remote and isolated areas, or those designated as
“fragile”, are not disadvantaged or adversely affected by investment and
development decisions. Critical to this aim is joint working with local planners to
support the development and sustainability of designated key rural settlements
across Argyll and Bute, as well as supporting the aims of the Loch Lomond &
Trossachs National Park. 
Key factors influencing the prioritisation of rural developments include: 
 the ratio of waiting list applicants to lets; 
 the ratio of social housing to second homes; 
 proportionate historic losses through Right to Buy; 
 the percentage of social housing to total dwelling stock; 
 the ratio of local earnings to average or lower quartile house prices and
private rents; 
 resilience of communities; and 
 population demographics. 
While existing, evidenced need remains the primary concern, consideration will also
be given to rural areas of potential economic development and/or population growth
in liaison with Economic Development colleagues and the local business sector. 
The rural/urban housing differential is acknowledged nationally in the structure of
the Scottish Government’s benchmark framework for grant funding, whereby Argyll
and Bute receives a rural uplift to address the additional costs involved in remote
rural and island development. The council previously commissioned dedicated                                                           
2 Rurality is defined in the Scottish Government Urban Rural Classification, see: 
http://www.gov.scot/Topics/Statistics/About/Methodology/UrbanRuralClassification. In addition, one
definition of fragility is outlined in the report: Review of Fragile Areas and Employment Action Areas in
the Highlands and Islands, HIE, November 2014.

Page 17

16 
studies of island housing markets, specifically for Mull and Islay3, which provided
evidence of the disproportionate uplift development costs for these areas and
highlighted specific issues and barriers to development in these contexts. The
Council continues to work with local communities to gather further evidence and
identify solutions. 
This SHIP has also been developed within the context of the Islands (Scotland) Act
2018, which introduced measures to support and help the unique needs of
Scotland’s islands now and in the future. The Act also seeks to help create the right
environment for sustainable growth and empowering communities. With around 23
inhabited islands in this local authority area (more than any other Scottish authority),
Argyll and Bute is committed to supporting and sustaining population and economic
growth in these communities and will always ensure to engage directly with the
islands when new policies and strategies are being developed that may impact on
them. 
The publication of the Scottish Government’s ‘Rural & Islands Action Plan
(R&IAP)’ in October 2023 acknowledges that in remote, rural and island areas,
small-scale actions can bring about significant impacts and a small number of
additional homes can make a generational difference, supporting the long-term
resilience of communities. The R&IAP sets out a range of actions in four key areas: 
1. Enable the delivery of more high-quality affordable homes;
2. Making best use of existing homes and support for home ownership; 
3. Supporting community-led development; 
4. Housing and local economies; 
The Council supports the key principles and the identified short, medium and long
term actions, many of which have already been taken into account in this SHIP. 
The SHIP aims to support the priorities of the island communities, and our
consultation reflects this commitment. In addition to the aforesaid island studies, we
ensure that our overarching HNDA process allows for a significant, representative
sample of local households on individual islands to participate and register their
housing needs and voice their general views on local housing. A formal Islands
Impact Assessment has been developed as part of the LHS process, and this
document also covers the SHIP. See Section 14 for details. 
To tackle the lack of sufficient housing in island communities the SHIP in the last 5
years (2018/19- 2022/23) has delivered 68 units on the islands, equating to 12% of
all units provided within Argyll and Bute. Of the seven SHIP projects completed
during 2022/23, two (10%) were located on the islands, and three (70%) were in
rural locations out with larger towns including Dunbeg. A further two projects (20%)
were located in the main towns of Helensburgh and Campbeltown. This reflects a
spread of new developments across the local authority area. The Council will
continue to explore opportunities to deliver more island and rural homes with our
partners and wider community groups. 
3 “Islay Strategic Housing Overview”, Community Housing Scotland (2019); “Isle of Mull Strategic Housing
Review”, Rural Housing Scotland (2019).

Page 18

17 
Future prioritisation process  
The implementation of National Planning Framework 4 (NPF4) requires councils to
support communities undertaking Local Place Plans. This will place greater
pressure on councils to address the needs identified by community plans. In the
future, the council will revise its prioritisation process to include a robust scoring
system to ensure transparency in the decision-making process.   
4. DELIVERING THE PROGRAMME: MITIGATING RISKS AND   
RESOLVING DEVELOPMENT CONSTRAINTS 
It is important to identify, assess and respond to any risks or potential constraints that
might impact the overall programme or individual projects; and that effective measures
are taken to mitigate these as far and as early as possible. The SHIP aims to assure
that, if funding is secured, any other constraints will be resolved by the time of the
estimated site start of the relevant project. The main risks or constraints that tend to
apply to the SHIP programme include: 
 Increased construction costs which are being impacted by supply chain issues,
unprecedented fuel costs and inflation.
 The constrained capacity of the local construction sector and tight labour
market.    
 Development and Infrastructure constraints.
 Effective land supply and legal procedural constraints.
 Planning issues. 
 Financial assumptions. 
Mitigating Constraints
The council and its partners are working continuously to minimise these risks and
mitigate constraints as far as possible 
a) Increased construction costs and a constrained labour market 
The constrained capacity of the local construction sector has a huge impact on
delivering new homes. Local contractors sometimes are forced to rely on
tradespeople from the central belt to fill in gaps in provisions. The on-going impacts
of Brexit and Covid 19 have reduced the number of people in the labour market.
AFFORDABILITY – as a basic rule of thumb, an affordable house price is reckoned
to be no more than 3.5 times the annual income of the household, and in terms of
renting a property, the affordable benchmark is often considered to be around 25%
of the household’s income. 
The volatile financial markets are having an impact on mortgage affordability. The
Financial Conduct Authority (FCA) classifies ‘higher risk’ lending as a loan-to-value
ratio over 90% and an income multiple greater than or equal to 3.5 for single income
purchasers, or 2.75 for joint income purchaser/s. (SG website, September, 2023)
Background and historic data - HNDA modelling mortgage impacts: guidance - gov.scot (www.gov.scot)

Page 19

18 
Therefore, employees are able to be more selective in the jobs they undertake. A
shortage of labour combined with the exorbitant fuel costs have placed additional
hurdles in the way of recruiting construction workers who are prepared to travel to
Argyll and Bute to undertake construction work. 
The Scottish Government issued revised benchmark costs in June 2023 to reflect
the increased construction costs. However, the cost of labour and materials appear
to have increased more sharply in remote rural and island communities. In addition,
RSLs and contractors continue to highlight concerns in balancing cost and quality
considerations, especially given the ongoing cost of securing private finance in a
high-interest financial environment. These factors will make delivering new homes
within the revised benchmark extremely challenging.   
To mitigate against higher construction costs and shortages of labour the Council
and its partners continue to explore innovative construction solutions, including
utilising technological solutions and modular construction methods if appropriate
for development. 
b) Rapidly changing economic landscape 
The HNDA published in 2021 included a range of scenarios such as: 
 the worst-case scenario of severe demographic and economic decline in the
short term; 
 less severe and stabilising scenarios; 
 to more optimistic growth scenarios; 
While the years following lockdown have resulted in increased population and
higher house prices in Argyll and Bute the economic landscape is extremely volatile
and uncertain. High energy costs, high inflation and higher interest rates have had
an adverse impact on the economy. This has resulted in further pressures on the
social rented sector. 
The prioritisation framework underpinning the SHIP must be flexible to address
emerging need and demand trends. 
c) Development Constraints (such as infrastructure issues: roads, utilities, ground
condition problems/ abnormal costs) - The core SHIP programme has always
aimed to focus on sites that are not subject to significant development constraints,
such as contaminated brownfield sites, designated greenbelt areas, or sites with
restricted infrastructure capacity in terms of access roads or water supply.
However, in certain instances within some highly pressured areas where a
substantial shortfall in affordable housing is evidenced or in areas of wider strategic
importance, it may be necessary to consider such sites in the absence of more
practicable or easily progressed sites. Apart from the site constraint, there may be
costs associated with carrying out remedial works, preliminary feasibility studies,
or mitigating the potential impact on areas of archaeological significance or historic
buildings, which further constrain on-site development. Mitigation may be aided by
ensuring site investigation is carried out at early stages and seeking to ensure land
values reflect any remediation costs. Regarding infrastructure constraints, such as

Page 20

19 
Scottish Water connections/ capacity/ access, early discussions with the Utility
companies are part of the SHIP process in order to address potential issues and
find solutions. Where possible, abnormal costs should be deducted from the land
purchase price, and unforeseen costs may be met from alternative sources such
as the council’s Strategic Housing Fund, developer contributions, or other funding
sources. 
The Housing Infrastructure Fund (HIF), in particular, has already proven to be a
significant factor in supporting housing development in this authority through grants
for sites which are of strategic importance and cannot proceed or have stalled due
to exceptional infrastructure works (out with the curtilage of the development); and
can help facilitate the unlocking of these sites for the delivery of housing. The
council successfully prioritised the further development of Dunbeg, for instance, as
a key site for delivery of housing utilising this fund and was awarded £2.1m in total,
in line with the eligibility criteria and guidance set out by the Scottish Government. 
d) Effective Land Supply – The RSLs and the Council are working actively in
partnership to identify landbank opportunities. A notable feature of a rural and
island authority such as Argyll and Bute is the dominance of large estates in terms
of land ownership in many areas exhibiting housing need. This can present
additional challenges in respect of accessing and assembling suitable sites for
development. Nevertheless, through collaborative efforts with planning colleagues,
the council and National Park are confident that a supply of land for affordable
housing continues to be sustained, as seen in the table below. 
The land supply figures in the table below are based on 2022 Housing Land Audit.
Work is on-going for the 2023 figures and these will be taken into account in the
next SHIP. 
TABLE 2: Land Supply within the Local Authority by Housing Administrative Area 2021-2026 
Source: Housing Land Audit 2022.

Page 21

20 
Occasionally, proposed projects are subject to complex or protracted negotiations
with private owners and their agents, which can impact on the timing and ultimately
on their deliverability. Therefore, effective liaison with the Scottish Government to
prioritise projects and progress site acquisitions to enable projects to be pulled
forward if required is essential. 
In addition, the impact of both the Council and National Park Affordable Housing
Policies continues to prove valuable; there is an obvious need to sustain practical
negotiations with landowners, Estates, private developers and others. Some RSL
partners have, however, raised concerns that in the current climate, the application
of the Council’s Affordable Housing Policy will make site development less
attractive, and sites are only likely to be developed where there is pressure to
secure a return in the short term. In the medium to long term, the private ownership
of many sites in Argyll and Bute means that the Affordable Housing Policy will
continue to have a definite role in securing a sufficient supply of affordable housing
through developer contributions. 
Partners continue to carefully consider the timing and possible phasing of
developments to make realistic assumptions on when affordable housing will
proceed. We aim to ensure that a sufficient supply of sites has been identified to
accommodate unforeseen project slippage and to ensure the spending of allocated
funding. 
In situations where projects cannot be taken forward due to land supply issues, the
council will consider a Compulsory Purchase Order (CPO) approach where there
are compelling benefits to the public interest. 
e) Planning issues - Early discussions will continue to be prioritised with planning
services (both Council & National Park) regarding road layouts/ car parking
requirements, flood risk assessments, school catchment areas, and other possible
issues. The provision of adequate footpaths adjacent to new developments, for
instance, has been a particularly prominent issue in a number of recent SHIP
projects. All of the development sites included in the SHIP programme should be
effective given that they will, in most cases, require to be already allocated for
housing development in the relevant local development plans. Many of the sites
identified in the SHIP are of relatively small capacity. The costs associated with
progressing smaller sites in the more remote rural areas are likely to be higher if
developed as standalone projects. However, it is envisaged that where SHIP sites
form part of a larger allocation identified in the LDP/ LDP2, through partnership
working with private developers on adjacent sites, the risk of such sites not being
developed on cost grounds will be reduced. 
RSLs in Argyll and Bute have recently made significant progress in delivering
alternative tenures such as shared equity units. The future provision for tenures
other than social rent will require detailed business plans and must reflect a robust
and credible assessment of local needs before approval. The Council intends to
evaluate the impact of these projects to inform the future programme. The Council
is keen to encourage and support alternative, intermediate tenures when
appropriate, to enhance the housing mix and to increase the range of potential
housing options.

Page 22

21 
5. RESOURCING THE PROGRAMME & THE COUNCIL’S  
CONTRIBUTION 
The three primary funding sources for the SHIP remain as follows: 
a) Scottish Government Grant (the Affordable Housing Supply Programme –
AHSP)
b) Council grant or long-term loan (the Argyll & Bute Strategic Housing Fund – SHF;
which may be supplemented from Council central reserves)
c) Registered Social Landlord (RSL) Private Finance Borrowing     
The majority of developments will require a complex package of funding from at least
all of these sources (additional investment from other sources may also be required –
some of these are outlined below). 
a) Scottish Government Resource Planning Assumptions (RPAs)
In July 2021, the Scottish Government confirmed local authorities’ RPAs up to 2025/26
however the current SHIP runs until 2028/29. The Scottish Government have not yet
agreed the RPA for years three (2026/27), four (2027/28) and five (2028/29) of the SHIP
programme. To address this the council has agreed to an assumed RPA for these later
years however it is important to note that the figures for 2026/27 to 2028/2029 are not a
formal definitive allocation. 
TABLE 3:  RESOURCE PLANNING ASSUMPTIONS (RPA) 2023- 2028 (£m)
Argyll & Bute 2024/25 2025/26 2026/27 2027/28 2028/29     Total
Minimum RPA £18.328 £18.632 £18.632* £18.632* £18.632* £92.856m     
Source: Scottish Government Letter to Councils – AHSP RPA 2021-26, July 2021 
The actual AHSP spend in 2022/23 was lower than the original RPA for that year. The
council will continue encouraging RSLs/developers to maximise funding opportunities
and utilise the available RPA as much as possible. This might include increasing off-the-
shelf / buy-back acquisitions, land banking in areas of identified need or designated
future economic growth spots. 
b) The Council’s Contribution – The Strategic Housing Fund (SHF) 
Resourcing the SHIP programme also requires a significant contribution from the
council’s Strategic Housing Fund (SHF). This fund is primarily based on the revenue
raised from reduced tax discounts on empty and second homes. Where local authorities
have used discretionary powers and reduced the empty and second homes tax
discounts, the additional revenue must be used to support affordable housing delivery
in their areas. In addition, since 2013, local authorities have had the flexibility to remove
the discount and apply a levy of up to 100% on long-term empty properties. These
revenues are not ring-fenced, although their use to bring long-term empty properties
back into use, or to support affordable housing provision, is encouraged by the Scottish
Government.

Page 23

22 
The SHF in Argyll and Bute is used for the following eligible expenditure:
 Expenditure incurred in relation to assets formally held on the Housing Revenue
Account;
 Expenditure relating to the acquisition of sites for the landbank;
 Expenditure related to the delivery of the Empty Homes Initiative;
 Payments to enhance infrastructure where this is restricting the development of
affordable housing;
 Payments to registered social landlords (RSLs) to partially fund proposed projects
to deliver homes in accordance with the local housing strategy. Since April 2016,
the council has provided grant funding of £12k per unit to supplement the Scottish
Government grant;
 Following the council’s annual policy review of the Strategic Housing Fund in
2018, grant funding of £12k per unit is available to community organisations, who
have been awarded Scottish Government support from the Rural or Island
Housing funds, to deliver affordable homes. Awards greater than £12K may be
awarded in certain instances to ensure the deliverability of projects with particular
challenges however this will be decided on a case by case basis.   
The balance of this fund as of 31st March 2023 was £10.183m, of which £1.474m was
already committed, with £8.709m available to help fund the SHIP programme. It is
anticipated that the SHF will continue to accrue annual revenue in the order of £2m over
the SHIP planning period. 
TABLE 4: Argyll & Bute Council Strategic Housing Fund, balance as of March 2023
Income
2022/23
Expenditure
2022/23
Balance   March
2023
Committed
Spend
Available to
support SHIP
£2.231m £1.574m £10.183m £1.474m £8.709m 
An indicative minimum estimate of circa £14.9 m would be required to support the core
projects outlined in this SHIP (£12k x 1241 units), 
In addition, the council has also used its financial reserves on occasion to advance
long-term loans to support RSL projects, and this commitment is subject to ongoing
review. 
c) RSL’s Private Finance Borrowing
Banks and other lenders in the private sector also remain vitally important partners in
the delivery of affordable housing. RSLs are required to demonstrate that sufficient
borrowing capacity or reserves exist to ensure the delivery of the proposed
development programme. The impact of rising interest rates on RSLs’ ability to borrow
will have to be kept under review. 
Housing Infrastructure Fund (HIF)
The Housing Infrastructure Fund supports housing development through grants and
loans, with priority given to sites of strategic importance that cannot proceed or have
stalled due to infrastructure requirements. Grant is available to local authorities and
RSLs for works which are out with the curtilage of the affordable housing site and/or
of scale and will open up larger sites for housing development. Loans are available for
viable non-public sector-led sites to support infrastructure delivery.

Page 24

23 
The council’s main priority for HIF funding remains focussed on the Lorn HMA but the
Council also continues to explore opportunities across the local authority area. As
reported in previous SHIPs, the Scottish Government awarded a Housing
Infrastructure Fund grant amounting to £2,129,247 for upgrade works to Kirk Road to
enable the development of 300 new affordable homes. 
The council and RSL partners will continue to propose potential projects within the
SHIP that could benefit from HIF investment. Details of current projects are in the table
below. 
TABLE 5: SHIP Projects with potential HIF requirements, as of August 2023
Project RSL Total Units Estimated HIF Requirement
Glencruitten, Oban LINK 100 (tbc) £0.72m
Hospital Field, Oban LINK 50 £2.0m
Dunbeg Phases 4-6 LINK 150 £2.5m
Bowmore (Phase 4) ACHA 17 £0.75m 
Rural and Islands Housing Funds (R&IHF)
The Scottish Government administers a £25 million Rural Housing Fund and a £5
million Islands Housing Fund. Both funds are aimed at increasing the supply of
affordable housing of all tenures in rural Scotland and to contribute to the national
affordable homes targets.  The Scottish Government have confirmed that these funds
will continue beyond 2021. 
During 2021/22 a private developer in Argyll and Bute accessed support from the
R&IHF to renovate and bring an empty building back into use as affordable housing
on the Island of Mull in conjunction with Mull and Iona Community Development Trust
(MICT). This was the first example of a local private developer using the R&IHF to
increase the supply of housing in the area. 
The Scottish Land Fund 
The Scottish Land Fund is funded by the Scottish Government and delivered in
partnership with the National Lottery Community Fund and Highlands and Islands
Enterprise. The SLF supports rural and urban communities with grants of up to £1
million to help communities become more resilient through ownership of land and
buildings, as well as practical support to develop projects. 
The Scottish Land Fund (SLF) continues to provide support to housing projects in
Argyll and Bute. With a recent award made to: 
 Tayvallich Initiative Ltd - The group are looking to purchase land and will use
the site to deliver affordable housing for rent, along with a number of
environmental initiatives. 
Key Worker £25m Fund - 2023/2028
The announcement of the new £25m fund to help local authorities and registered
social landlords to make best use of underused or empty properties by making them
available as affordable homes for key workers and others in need in rural communities
is welcomed in Argyll and Bute.

Page 25

24 
The Council will aim to maximise all funding opportunities and work with partners to
identify projects that could deliver worker housing to sustain our communities and
support economic growth. 
Rural Growth Deal 
The housing element of the Rural Growth Deal is £3m. Two projects are being taken
forward, the project in Bowmore, Isle of Islay will focus on housing for sale for principal
occupation, and the one in Tobermory, Isle of Mull will provide accommodation for
workers. 
Islands Programme Funding 
The Council were successful in securing £700k from the Islands Programme funding
to enable the delivery of the infrastructure to support the development of worker
housing in Tobermory, Isle of Mull. 
Developer Contributions
Argyll and Bute falls within the purview of two planning authorities: while the council
covers most of the mainland and islands, Loch Lomond & Trossachs National Park is
the planning authority for parts of Cowal and Lomond. Both authorities have set out
formal Affordable Housing Policies in their respective Local Development Plans.
These policies outline mechanisms and options to secure developer contributions
where there is a demonstrated need for affordable housing.   
The Argyll and Bute Local Development Plan 2 includes a policy on the provision of
housing to meet local needs including affordable housing.  This expects all new
housing developments of 8 or more units to deliver a minimum of 25% of the total
number of units on site as affordable housing. Given the revised and reinforced
strategic vision of growth and repopulation for the whole of Argyll and Bute and the
Council’s declared housing emergency, a technical note on the delivery of affordable
housing (including housing for key workers) to accompany LDP 2 will be prepared in
2024. 
Developer contributions can be delivered by a variety of means, including social rented
housing, mid-market rented housing, payment of commuted sums and also the
building of houses/apartments designed to meet the needs of first-time buyers
(provided these are available at affordable levels as defined by the council’s HNDA
and with reference to the relevant local housing market).   
The sequential mechanisms for securing Affordable Housing via the policy are applied
in the following order: 
 on-site provision; 
 off-site provision; 
 commuted payment; 
 discounted low-cost sale; 
 affordability by design without subsidy. 
To date, no commuted sums have been received, and the preferred approach has
been to engage with an RSL to deliver the affordable quota on site.

Page 26

25 
The LLTNP policy follows a similar approach, with a requirement for 25%, 33% or 50%
affordable provision on sites of 4 or more units depending on the location. Sites of up
to 3 units in accessible rural areas may also have a policy requirement under certain
circumstances. A formal policy for calculating commuted sums within the LLTNP has
been established.  There has been one recent commuted sum within the LLTNP for
an application approved in 2020 which was in relation to the erection of a new dwelling
house incorporating conversion of former kennel building. The policy required
development within the site to provide for 100% affordable housing, the project costs
for the development had been provided and it was recognised that works involved in
converting the existing building would mean that that resultant dwelling would not be
affordable.  Whilst this was a departure from the approved Housing Policy 2, due to
the particular circumstances, and the benefits of restoring the traditional building, it
was considered that the payment of a commuted sum towards affordable housing
would be acceptable which was accepted by the applicant and secured through a
Section 75 Agreement.   
The delivery of unsubsidised affordable housing for purchase via the Affordable
Housing Policy, but without Scottish Government funding, will normally target a
different client group and requires close working between Housing Services and
Planning colleagues to ensure these models are in fact affordable in accordance with
the LHS and SHIP priorities. 
Other Initiatives
The council will also continue to explore and, where appropriate, promote non-AHSP
financing models such as Build-to-Rent, Low-cost Initiative for First Time Buyers
(LIFT), and Open Market Shared Equity (OMSE), which may fall out with the remit of
the SHIP. 
6. EMPTY HOMES 
Supporting empty homeowners to take action to bring properties back into use remains
a priority for the council as this will help to maximise the use of existing resources to
meet housing need; contribute to number of the council’s wider strategic objectives;
and provide cross-service benefits both within the council and with external partners.
The council has an Empty Homes Officer who can support owners with a range of
practical options to help them make informed choices about the best outcome for them
and their property. 
During 2022/23 the Empty Homes Officer assisted in bringing 41 empty homes back
into use which was 37% above target. Over the last 3 years, the council’s approach
has enabled owners to bring 108 vacant properties back into use against a baseline
target of 30 per year. The length of time that properties had remained empty prior to
being brought back into use varies, the average is between 1-5 years, with the longest
empty for 15 years.

Page 27

26 
TABLE 6: Length of time a property had been empty 2022/23
Length of time property had been empty 2022/23 No of Empty Homes
less than a year 5
between 1-2 years 13
between 2-5 years 13
between 5-10 years 9
longer than 10 years 1
Total 41
Over the last five years, according to the Council Tax Register, the number of long-
term empty properties has reduced by 14%, whilst the number of second/holiday
homes and the total dwelling stock has remained relatively static with slight variations
in the overall numbers. 
TABLE 7: Estimated Ineffective Stock Argyll and Bute 2017-2022
Council Tax Register 2019 2020 2021 2022 2023
All properties 48,906 48,285 48,166 48,570 48,971
2nd /holiday homes 2,939 2,881 2,689 2,821 2,874
Long-term empty including
those subject to levy
1,479 1,363 1,230 1,135 1,263
No of long term empty subject
to double charge (200% levy)
586 644 644 640 795
Long-term empty homes as %
of total
3.02% 2.82% 2.55% 2.33% 2.58%
Empty + 2nd /holiday homes
as % of total 
9.03% 8.79% 8.14% 8.14% 8.45%
Source: Council Tax Register 
Empty Homes Officer – Key Worker HSCP / Shelter Project 
The Councils empty homes service was expanded in 2022/23 with an innovative new
project.  Following a successful funding bid to Shelter Scotland and A&B Health and
Social Care Partnership (HSCP), a new Empty Homes Officer post has been created
in 2022/23 who will specifically work with partners to bring empty homes back into use
for HSCP staff.  The post will be managed within Councils Housing Service team and
build on the work of existing Empty Homes Officer post. This post will help to address
the acute shortage of housing which is hindering recruitment of key health and social
care staff, and to support local service delivery.   
Compulsory Purchase Orders (CPOs)
The use of Compulsory Purchase Orders legislative powers allow councils to acquire
empty homes under certain circumstances and subject to specific conditions. The
Scottish Government refreshed the guidance in 2018, which has refined the legal
process and made it less complex and time-consuming for local authorities to submit
an application to Ministers for consideration. Whilst the CPO has historically been
considered a last resort and has not been standard practice, it is the council’s view
that these powers do have a strategic role to play and could be used more effectively
where there are no other practical solutions to address the issues of the most
problematic buildings in the area. This has been reinforced by feedback to the LHS
early engagement consultation: when local residents and community groups were
asked to rank the top housing challenges currently facing Argyll & Bute, 38% of

Page 28

27 
respondents highlighted the impact of empty properties and second/holiday homes,
making it the third highest issue among the local population. 
CPO powers were successfully utilised in 2019, to acquire an empty property that had
no legal owner. The council then facilitated back-to-back sale to enable the property
to be brought back into use. Without legal intervention the property would have
remained empty indefinitely having a detrimental and financial impact on the other
owners in the tenement. 
A CPO policy and process will be incorporated into our revised Scheme of Assistance
as an action for the LHS, targeting resources to the most difficult cases where there
are no alternative options to bring them back into use. 
7. CHILD POVERTY AND FUEL POVERTY   
In line with the Child Poverty (Scotland) Act 2017, the council, together with the Health
Board, produces on an annual basis the Argyll & Bute Local Child Poverty Action
Report (LCPAR). This report sets out progress against the four statutory, income-
based targets, to be achieved by 2030. These targets are: 
 Less than 10% of children are in relative poverty 
 Less than 5% of children are in absolute poverty 
 Less than 5% of children are in combined low income and material deprivation 
 Less than 5% of children are in persistent poverty 
The Scottish Government’s Delivery Plan for tackling child poverty ‘Bright Start, Bright
Futures’ places the tackling of child poverty at the heart of the Affordable Housing Supply
Programme. Bright Start Bright Futures states: “Housing has a vital role to play in tackling
child poverty; it forms not only the foundation for family life – as a safe place for children
to grow and learn, and for families to come together – but it also one of the most
significant costs which families must continue to meet on an ongoing basis. If families
lose their home, the effects can be devastating – and cause lasting damage to children’s
lives.” 
Research suggests that living in temporary or insecure housing negatively impacts
children’s development and education, locking them into a cycle of poverty. Therefore
it is vitally important to provide homeless families with children permanent
accommodation. The council and its partners have substantially reduced the number
of homeless families with children in temporary housing. Table 8 shows that both the
number of households and the numbers of children in temporary accommodation
increased last year.

Page 29

28 
TABLE 8: Number of homeless households and the number of children in
temporary accommodation as at 31st March 2023
HOMELESS STATISTICS
2019/20 to 2022/23 2019 2020 2021 2022 2023
Change 
2022 to
2023 
Number
Change 
2022 to
2023 
%
Households with children or a
pregnant woman in temporary 
accommodation 
30 25 30 25 30 5 20%
Number of children
in temporary accommodation  65 55 60 45 60 15 33%
Source: Scottish Government, “Homelessness in Scotland: 2022-23”, October 2023 
The numbers of homeless children or children threatened with homelessness within
Argyll and Bute increased between 2021/22 to 2022/23. The Cost of Living Crisis could
have an impact of figures as wages are not keeping track with inflation resulting in
families paying exorbitant amounts for food and energy. This, coupled with higher
interest rates, will mean, for some, higher mortgage payments or private landlords
passing on increased mortgage costs to their tenants. The consequences of energy,
food, accommodation as well as many other products all costing substantially more
will mean many families will be unable to finance the necessities and for some this
may result in them becoming homeless. Therefore, having an adequate supply of
affordable housing is more important than ever.   
Table 9: Number of children associated with applications assessed as
homeless or threatened with homelessness
Local
Authority
2018-
19
2019-
20
2020-
21
2021-
22
2022-
23
Change Change 
21-22 to
22-23
21-22 to
22-22 
Number % 
Argyll &
Bute 164 153 161 166 183 17 10% 
Source: Scottish Government, “Homelessness in Scotland: 2022-23”, October 2023 
In 2022/23, the HOMEArgyll RSLs rehoused 305 households who had at least one
household member under16 years of age. This equated to 528 children housed in
2022/23 which was 38% of the total lets that year. 
Although housing 528 children last year was a considerable achievement, as of
September 2023, there were 970 applicants over a third (33%) of the waiting list, with
a household members under 16 waiting to be housed. This equates to 1,821 children
currently on the housing waiting list. Some of these households (130) have been
awarded the maximum 200 points and are deemed to be in extreme housing need and
hence will be a priority for rehousing. However, not all families with children will receive
priority assistance for rehousing, with 224 applicants with children not being awarded
any housing points under the allocations policy.

Page 30

29 
The Child Rights and Wellbeing Impact Assessment (see section 14) undertaken as
part of the LHS process highlighted the negative impact on educational attainment of
children living in overcrowded accommodation. As of September 2023, 448
households with children under 16 years of age are overcrowded. Bright Starts Bright
Futures identified families with more than three children are one of the six family types
at greatest risk of poverty. There were 144 applicants with children equating to 4% of
HOMEArgyll waiting list who required a larger family home (4 or more bedrooms). The
SHIP housing planning process will place additional focus on housing those with a
need for a particular size of property in a specific location. This approach will ensure
that larger family homes are delivered where they are required. This may including
RSLs purchasing appropriate ‘off the shelf’ properties’ (see section 11). 
TABLE 10: Minimum number of bedrooms required by families on the
HomeArgyll waiting list 
HOMEARGYLL WAITING
LIST SEPTEMBER 2023  1 bed  2 bed 3bed 4 bed 5 +
bed TOTAL
Number of Applicants                                   
(with members under 16) 2 493 331 105 39 970
as % of total 0.21% 50.82% 34.12% 10.82% 4.02% 100.0%
Source: HOMEArgyll waiting list September 2023 
In most households housing and energy costs are the largest financial outgoing. The
SHIP not only provides access to affordable homes for families living on low incomes
but it also provides energy efficient homes. In the current economic climate, energy
costs are unprecedentedly high, making it more important than ever to reduce the
amount of energy needed to keep a home warm. Therefore, the council will ensure
that 100% of the SHIP programme will meet the green standards. 
Promoting energy efficiency and tackling fuel poverty remain strategic priorities for the
LHS and key commitments for the council; and maximising opportunities for
sustainability in development remains a key principle underpinning the SHIP. As with
all public bodies, this council is also required to meet its statutory duties arising from
the Climate Change (Scotland) Act 2009, and the LHS and SHIP have been developed
to ensure that the provision of new affordable housing complies with the Act; and that
all housing activities and outputs should contribute to the overarching net zero targets
and principles.  The Council are also developing a Local Heat Energy Efficiency
Strategy (LHEES) and Delivery Plan, which will set out strategic aims and priorities for
achieving net zero across the Argyll and Bute area. 
8. SPECIALIST PROVISION INCLUDING WHEELCHAIR 
ACCESSIBLE HOUSING 
The SHIP aims to address the housing needs of all the communities we serve and
continues to reflect a positive approach to equalities issues in line with the policies of
the council and its partners, and the principles of diversity and inclusion in accordance
with the Equality Act 2010. The HNDA (2021) provides robust evidence of
accommodation and support needs across the range of protected equalities
characteristics, and these have been translated into the SHIP priorities. The joint Argyll

Page 31

30 
and Bute Health, Care & Housing Needs Assessment, completed in 2018, provided
supporting evidence of the requirements for wheelchair accommodation, supported
housing, and other forms of specialist provision. In 2019/20, the council undertook
further specific studies on the need and demand for specialist provision for wheelchair
users, gypsy/travellers, military personnel and veterans, and persons who are autistic
or have learning disabilities. The findings have informed the 2021 HNDA and the
revised LHS which was published in 2022. An equalities impact assessment (eqseia)
was undertaken during the development of the LHS, and this will inform the SHIP. 
All SHIP projects, seeking public subsidy from the Council or Scottish Government,
are required to meet basic design and building standards (of the Housing for Varying
Needs Standard as a minimum) and should incorporate adequate provision to meet
any additional identified particular needs. Prioritisation of projects will give due weight
to those which incorporate elements of design or additional specifications for specialist
forms of housing where the local profile of need and demand indicates such a
requirement. The committed and planned programme include provision for elderly and
disabled residents and through the close partnership working with Health & Social
Work, including Occupational Therapists, the SHIP will continue to ensure the strategic
aims of the LHS in this respect are carried forward. 
In particular, the dedicated Housing OT post to co-ordinate and promote these needs
through the SHIP group, was made permanent in 2021, funded in full by the council
Housing Services but working very closely with RSLs and the HSCP. In practice, this
commitment to equalities principles will ensure: 
 building all new affordable housing to HfVN Standards;
 implementing design solutions which help to meet the needs of disabled and
infirm households;
 assessing and seeking to resolve the needs and aspirations of households with
community care needs in partnership;
 developing communities with a good mix of households;
 allocating housing via HOME Argyll and national RSL partners who have strong
commitments to equal opportunities; and
 providing affordable housing in rural areas which enables young and old people
to remain within their communities. 
Housing for Varying Needs (HfVNs) is a Design Guide published in two volumes (Parts
1 and 2). While not mandatory, the standards outlined in the guide have been used as
the basis for standards for housing developments seeking grant funding support. The
standards are intended to ensure that the housing is accessible, adaptable for different
needs and over its lifetime represents good value for money. They are based on the
principle that the design of a property should not hinder a person’s ability to live as
independently as possible and should recognise the needs of people as they age,
become less able or whose mobility, dexterity, cognitive function, hearing or sight is
impaired.   
The idea of designing all housing to accommodate the needs of less able people is
known as “barrier free” design and this is reflected in the core guidance of the design
guide; but the guide also recognises that barrier free design in itself is not a substitute

Page 32

31 
for homes designed specifically for people with particular needs so it identifies
additional features that should be included to address these needs. 
Analysis of the HOMEArgyll Common Housing Register in September 2023 suggests
that over 21% of applicants could benefit from some form of specialist provision such
as amenity, sheltered, or wheelchair housing (this will include an element of double
counting as applicants can select more than one type of housing). Three percent (106)
applicants requested wheelchair accessible accommodation; although 72 of these
applicants also selected some other form of accommodation, including general needs/
mainstream housing. Only 27 applicants only selected wheelchair housing. 
Applicants requesting wheelchair provision required homes with the following number
of bedrooms:
 58 (55%) of wheelchair applicants required a 1 bedrooms
 30 (28%) of wheelchair applicants required 2 bedrooms 
 15 (14%) of wheelchair applicants required 3 bedrooms 
  3 (3%) of wheelchair applicants required 4+ bedrooms 
The Health, Care & Housing Needs Assessment (2018) identified the following key
points:- 
 Over 1,300 people in Argyll and Bute have wheelchairs on issue
 Around 350 wheelchairs are issued each year to people in Argyll & Bute
 The majority of wheelchairs issued are manual chairs
 55% of people with wheelchairs are aged 75+
 Up to 280 people a year may be new wheelchair users
 There could be 240 additional people needing wheelchairs by 2027
 The most common reason for a wheelchair is cerebrovascular disease
(stroke) but the main reasons for wheelchair vary by age with Cerebral palsy
being the most common reason in people under 25. 
Correlating the data sources may suggest that a majority of wheelchair users are
satisfactorily housed or do not aspire to social rented properties. However, some
wheelchair users who could benefit from specialist provision in the social rented sector
may not apply due to lack of awareness or misperceptions regarding the suitability and
availability of stock. This was identified as a key area for further research and analysis,
and in 2019/20 an in-house study completed jointly by the council’s strategy team and
the Housing OT.   A key finding of this study, collated with national research, is that
wheelchair users and those who might benefit from wheelchair accommodation are
not a homogenous group and a variety of housing solutions are required.         
Solutions such as aids and adaptations or support services will have a crucial role to
play, nevertheless, the SHIP will continue to require a target of 10% of the new build
programme to provide some form of specialist provision (to include retirement housing,
amenity housing, and other specially adapted properties); and within that, half (i.e. 5%
of the total new builds) should be built to the fully wheelchair habitable standard as
defined in the relevant Section of the current HfVN standards guidance. In 2022/23
there were a total of 36 affordable homes designed for particular needs delivered
within the SHIP programme, amounting to 19% of the year’s total, which exceeds the
annual target of 10% overall (5% wheelchair and 5% other models of specialist

Page 33

32 
provision, excluding adaptations to existing stock). The new build units included 14
wheelchair accessible homes (7.45% of total) and 16 adapted/amenity/older person
units (11.7%). 
As far as possible, the wheelchair housing targets will also be encouraged within the
private sector, across all tenures, on all developments where this would be
appropriate. The SHIP Officers Group and the Strategic Housing Forum approved this
policy with immediate effect in 2020. RSL partners also continue to explore with the
HSCP requirements for extra care provision and possible new housing models for
people being housed in the community which is in accordance with the HSCP
aspiration to enable those with additional needs to live as independently as possible.
The council will strive to incorporate housing models which promote independent living
within the SHIP programme as it rolls forward. 
9. GYPSY/TRAVELLER SITES 
Argyll and Bute Council continues to support the Scottish Government’s commitment
to improve the lives of our Gypsy/Traveller communities; and to prioritise joint working
with ACHA (who own and manage the two official, operational, Travelling Person sites
in Argyll and Bute) and other stakeholders to drive forward positive improvements for
this client group. 
The council continues to allocate ACHA an annual grant from the Strategic Housing
Fund as a contribution towards the operation and maintenance of the two remaining
Travelling Persons Sites at Bayview near Oban, and Duncholgan near Lochgilphead.
A Minute of Agreement set up at the point of stock transfer in 2006 set the sum at £30k
plus annual indexation. In 2018, the sum payable was reduced to reflect the withdrawal
of the Torlochan site near Dunoon, which was deemed to be surplus to requirements
due to the lack of demand. Recent council investment in the official sites is
summarised below: 
TABLE 11: ACHA Gypsy/Traveller Sites – Annual Council Funding  
Year 2018/19 2019/20 2020/21 2021/22 2022/23 5 year Total
Grant £31,001 £28,939 £29,338 £31,639 £35,881 £156,798 
As part of the comprehensive refresh of the Housing Need and Demand Assessment
for Argyll and Bute, the council carried out a dedicated study to assess the
accommodation and support needs of Gypsy/ Travellers in the area. This included an
assessment of any “bricks and mortar” mainstream accommodation that may be
required. The study has involved extensive primary engagement with
Gypsy/Travellers and their representatives; and this work has informed the
development of the latest LHS for Argyll and Bute. 
Gypsy/Traveller Working Group 
In 2019 the Scottish Government and the Convention of Scottish Local Authorities
(COSLA) launched the ‘Improving the Lives of Scotland’s Gypsy/Travellers’ strategy.
One of the key aims of the strategy is for the Gypsy/Travellers community to ‘have a
seat at the table, are listened to, and have a say in the decisions that affect their lives’.

Page 34

33 
The Housing Service established a Gypsy/Traveller Working Group (GTWG) in 2022
as the forum which aims to make this happen in Argyll and Bute. The Terms of
Reference of the GTWG include: 
 Understanding the accommodation needs and preferences of Gypsy/Travellers to
inform future provision
 Work with Gypsy/Traveller communities to raise awareness of rights and
entitlements 
 Ensure that our public services are responsive to Gypsy/Travellers needs and
preferences
 Provide leadership to tackle racism and discrimination
 Strengthen community development and engagement
 Work with Gypsy/Travellers to improve their involvement in national and local
decision making 
The GTWG has been instrumental in improving partnership working, co-ordinating
action, and facilitating engagement with the community.   
Gypsy/Traveller Site Upgrades
ACHA secured £108k from the Scottish Government’s Capital Fund for Improving
Gypsy/Traveller Sites. This was invested during 2021/22 and works completed in
2022/23 to make interim improvements to both official sites at Bayview (near Oban)
and Duncholgan (near Lochgilphead). 
To develop longer term plans for the future of both the sites in Argyll, ACHA engaged
consultants to work with the community over the last year. A number of consultation
sessions have been held and plans on the future of the sites are being developed in
conjunction with the community to ensure that these meet their housing needs.  The
main round of Capital Funding to enable Gypsy/Traveller site improvements across
Scotland, was oversubscribed and we are awaiting an update from COSLA/Scottish
Government to identify if the Capital Fund will be extended to enable long-term
proposals to be taken forward in the near future. 
10. HOMELESSNESS/ RAPID REHOUSING TRANSITION PLANS & 
RAPID REHOUSING TRANSITION PLANS 
Scottish Ministers have made an ongoing commitment to end homelessness in
Scotland and consequently set up a national Homelessness and Rough Sleeping
Action Group (HARSAG) to bring forward recommendations to address this. A key
proposal was that each local authority should develop a Rapid Rehousing Transition
Plan (RRTP) by December 2018, covering a 5-year period, or longer if required, to
enable the implementation of this new approach. The RRTP maximises prevention
and sets out the council’s approach to minimise the time a household remains
homeless and to ensure that they can access appropriate suitable accommodation as
soon as possible. 
Local Rapid Rehousing Transition Plans should be reflected in the LHS and also be
fully integrated into Health & Social Care Partnership strategic plans. The Argyll and

Page 35

34 
Bute RRTP has consequently been included in the current Housing Contribution
Statement to ensure it forms part of the planning framework. This SHIP’s strategic
housing priorities are aligned and consistent with the proposed RRTP priorities and
outcomes. A crucial objective is to facilitate and deliver more affordable housing via
the SHIP. 
Argyll and Bute Council continues to liaise with RSL partners and other key
stakeholders to develop and implement the RRTP; and will aim to ensure that
homelessness remains a critical factor in the SHIP process. This includes
homelessness as one criterion for assessing need, prioritising projects, and awarding
grants from the Strategic Housing Fund. SHIP projects are expected to contribute
directly or indirectly to alleviating homelessness across Argyll and Bute. The
performance of developing landlords in respect of the proportion of allocations to
homeless households and time taken to rehouse these clients will continue to be
material considerations in SHIP programming decisions and resource allocation
moving forward. 
RRTP funding was made available for a 5 year period which comes to an end in March
2024. The main Argyll and Bute projects which continued to be funded in 2022/23
include: 
1. Mental Health / Addictions Housing Practitioner – There have been over 81
referrals for support. The post was vacant for period of time in 2022/23. 
2. Housing First – Four new Housing First cases were supported. All seven
Housing First tenancies are being sustained although progress in creating new
tenancies has been slower than originally planned. The Housing First Delivery
Group are committed to continue creating Housing First permanent tenancies
across Argyll and Bute.
3. Rent Arrears Prevention Project – Working with RSL partners, 95 households
in rent arrears were prevented from becoming homeless. 
4. Flexible Emergency Fund – 211 households have received assistance to
prevent them becoming homeless. 
5. Psychologically Informed Environments (PIE) Decoration Project – 104
households have been assisted through the project to set up their permanent
tenancy.   
11. BUYBACKS, SECOND-HAND ACQUISITIONS AND OFF SHELF 
Argyll and Bute Council agreed a statement (Annex 1) with the Scottish Government
in 2022 which would provide a streamlined approach for acquiring second-hand stock
where the acquisition and work costs do not exceed £75k of ASHP grant. 
This approach will help increase the supply of affordable housing especially for priority
property types and sizes in areas of high demand (particularly where stock has
historically been depleted through Right to Buy). The AHSP funding will help enable
the purchase of existing properties for people with particular needs, or to meet specific
demands.

Page 36

35 
Buy-backs
To help address the challenges in the housing market, the Council have created a
scheme to promote the option for ‘buy back’ of properties to increase the supply of
social housing stock. In June 2023, in conjunction with our RSL partners / SHIP Group
we agreed for a statement to go on the Council’s website to promote the Buy Back
Initiative in Argyll and Bute. There are restrictions on the types of properties that can
be purchased and it must not lead to current occupant being left with no alternative
housing options.  A property will be considered if it meets the following criteria. 
 There is demand for the type and size of property in that area;
 The combined cost of buying the property and bringing it up to letting
standards would represent value for money;
 Properties, where a tenant would have to leave the property to enable a
sale, cannot be considered;
 Priority will be given to purchasing properties which would enable an RSL to
take complete, or majority, ownership of blocks of flats making communal
repairs much easier to complete. 
Whilst the Council are monitoring the enquiries received, the details are passed
directly to the appropriate RSLs for consideration and follow up with the owner if they
have an interest in acquiring.  If a suitable property is identified, the Scottish
Government will be approached directly for any units that RSLs are interested in
acquiring to discuss potential benchmark subsidy level for acquisition. 
During the first three months since the statement was released (end June to
September 2023), there have been 26 enquiries received.  7 of these have been
general enquiries and 19 with specific properties offered for sale including a mix of
residential and commercial.  The range of enquiries has varied from one bedroom flats
to large detached properties. Our RSL partners are currently considering a number of
these enquiries. 
Off-the-shelf purchases 
While it is expected that the majority of homes will be delivered through the SHIP
occasionally, the most appropriate approach to meeting particular needs may be best
satisfied by an ‘off the shelf’ purchase from developers. These will be considered on
a case-by-case basis. 
Other opportunities 
In addition to the buy-back initiative, to help to maintain viable, sustainable
communities, the Council are exploring the possibility of buying properties on the open
market for resale with title burdens which require primary occupancy. 
12. WORKER ACCOMMODATION 
The remote geography of Argyll and Bute means that many communities are isolated
and require a degree of self-provision in terms of local services. At a local level,
employment opportunities are often interlinked and contribute to the general cohesion
of the community, for example a fish farm may rely on local transport providers, but in
turn be relied upon by local hospitality and food providers. Such is the fragility of these

Page 37

36 
situations that a reduced capacity caused by a lack of staff anywhere in this chain can
impact on the wider range of services and sustainability of communities. 
The definition of key workers can vary and if often determined by individual local
authorities based on local priorities. To reflect the fact that housing workers of all types
can affect the local economy, and especially in light of the evidence given by the
pandemic of how important all workers are, it is proposed in Argyll and Bute to use the
term ‘worker housing’ to capture the important role all workers have in sustaining
communities and the economy in the widest possible context. 
Worker housing has been identified as a key issue and increasing the supply of
housing options to retain and grow Argyll & Bute's working age population is being
prioritised. The lack of housing is frequently cited by employers as one of the main
difficulties in attracting and retaining staff, and it is important to address this within the
LHS and SHIP. 
As referred to in Section 2, Argyll and Bute Council have declared a housing
emergency and have been undertaking wider engagement with local households and
employers. To help inform how the workforce housing shortages should be tackled,
we have issued a survey to local businesses to understand how a lack of housing is
affecting employee recruitment, retention, and business growth; and to obtain
feedback on what local employers think needs to happen to increase housing options
and choice for working age households across the area.  The survey findings will help
inform future priority areas and tenure types to increase the supply of worker housing.   
The Council are continually exploring opportunities to increase supply of worker
accommodation to support businesses and the local economy.  There are already
some specific projects being taken forward, including a new Empty Homes Officer post
in conjunction with Shelter and Health and Social Care Partnership to bring properties
back into use for HSCP staff; using a Council owned property for the provision of
worker accommodation on Isle of Mull in partnership with Mull and Iona Community
Trust; and proposals for the development of worker housing in Mull via Rural Growth
Deal. We are working within the Council and with our RSL and community group
partners to identify suitable projects to utilise the £25m Scottish Government funding,
including potential of repurposing of two office spaces in Oban. 
13. UPDATE FROM THE PREVIOUS SHIP 
SHIP 2017/18 to 2022/23: 
Building on the 448 units completed between 2017/18 and 2021/22, there were a
further 180 units completed in 2022/23; bringing the five-year cumulative total to 628
affordable homes. 
The 180 completions during 2022/23 are below our ambitious annual affordable
housing target of 215.  Given the extremely challenging conditions over the last few
years, resulting from the pandemic and the resultant supply chain issues this is still a
very positive outcome.  This equates to 87% of the annual affordable Housing Supply
Target outlined in the LHS.

Page 38

37 
TABLE 12: LHS 2022-2027 Housing Supply Targets (HST) 
During 2022/23 five of the local RSLs contributed to the total programme. Loretto
developed 36 new affordable units; ACHA delivered 15 new homes; West Highland
completed 18 new builds; and Link completed 119 units in Dunbeg Phase 3, with the
remaining units to be completed during 2023. 
In terms of tenure, 162 units (86%) were for social rent and 26 (14%) were new supply
shared equity (NSSE).   Whilst the majority on units were for general needs housing
(152), there were 20 amenity units and 16 wheelchair/specialist units delivered.   
TABLE 13:  SHIP Completions 2022/23 
Argyll & Bute 2022/23 - 2026/27  2027/28 - 2031/32 2022/23 - 2031/32 
Annual Target          Total Annual Target          Total 10 Year total
Total HST 290 1,450 33 165 1,615
Affordable
Housing
215 1,075 13 65 1,140
Private Market
Housing
75 375 20 100 475
Project
Housing
Market Area
(HMA)
Developer Tenure Type of
provision
Number
units
Sawmill Field,
Helensburgh  H&L LORETTO Social rent 32 x General     
4 x Amenity 36
Jura Islay, Jura &
Colonsay WHHA Social rent 8 x Amenity,      
2 x General 10
Millknowe,
Campbeltown Kintyre ACHA Social rent 1 x wheelchair 1
Dunbeg 
Phase 3 Lorn LINK/
WHHA
Social rent 
x 95 &
NSSE x 24
102 x General          
11 x Wheelchair 
6 x Amenity 
119
Oakhill,
Tarbert Mid-Argyll ACHA Social rent 4 x General 4
Inveraray Mid-Argyll ACHA Social rent
6 x General,      
2 x wheelchair     
2 x specialist 
10
TOTAL 180

Page 39

38 
Map of completed units via SHIP 2022/23 
14.  THE REVISED PROGRAMME 
The current year, 2023/24, is covered by the Strategic Local Programme Agreement
(SLPA) between the council, the Scottish Government, and the developing RSLs, and
the previous SHIP (approved in 2022); while this new SHIP will commence from
2024/25. The programme is subject to ongoing change as either barriers to progress
or windfall opportunities arise. Consequently, the following tables simply summarise
all proposals at the time of writing, including those projects which are expected to
complete in 2023/24 and for which funding has already been drawn down. It should
be noted that the status of many future projects, particularly in the later years, remains
provisional and purely indicative at this stage; some may not proceed, or complete,
within the timescale. However there is also scope for additional proposals to be
brought forward or included in the programme. 
Further details of the programme and individual projects are outlined in the electronic
reports recorded on the Scottish Government’s Housing and Regeneration
Programme (HARP) system.

Page 40

39 
TABLE 14: SHIP Projects Completions/Anticipated Completions in 2023/24
Project address Developer Units
Anticipated
Completion
Date
Eton Avenue, Dunoon ACHA 4 October 2023
Dunbeg Phase 3 (remaining units) LINK 66 TBC 
Imeraval Phase 4 Islay WHHA 20 March 2024
Port Appin Phase 1 WHHA 6 March 2024
Buyback Acquisitions  ACHA 8 March 2024
Buyback Acquisitions FH 2 March 2024
Argyll & Bute 2023/24 Total Completions (est.) 106 March 2024 
If this programme is successfully delivered in full within the planning period (plus
completions in 2023/24), it could provide over 1,395 new affordable homes across
Argyll and Bute by March 2029. Projects on islands account for 22% of properties to
be developed by the SHIP, the rural mainland accounts for 17% of the programme;
while 36% of units are in the key strategic settlements of Oban and Dunbeg; 7% in
Helensburgh; with 16% in the other main towns of Dunoon, Campbeltown and
Lochgilphead. 
There is an expectation that the majority of these units will be built to allow for future
adaptation to meet changing needs over time; and in addition approximately 10% (i.e.
128 units, if the above programme is delivered in full) should be purpose-designed to
medium or high dependency standards with potentially 64 of those units (5% of the
total) being fully wheelchair accessible.                                              
In addition to this core programme, a number of other potential proposals are being
developed for further consideration in later years of the SHIP, subject to robust
assessments of need and demand, site assembly or acquisition, and available funding.
Some of these projects therefore remain notional at this stage or are subject to
development constraints that require to be addressed/ mitigated before they can
proceed. These projects are also dependent on clarification of local need or potential
demand to support growth and recovery agendas; and will be considered in future
updates of the SHIP. 
The council will also continue to actively explore other sites and projects out with the
core SHIP funding programme, as outlined in previous sections of this plan, where
these are consistent with LDP policy/housing land provisions and align with high
quality fit-for-purpose assessments of local housing need and demand.

Page 41

40 
TABLE 15: SHIP Core Programme - Potential Completions by March 2029
Project Address Developer
Total
Units
Anticipated
Completion
Bowmore Phase 4 ACHA 17 Year 1 (24/25)
Dalintober, Campbeltown ACHA 20 Year 1 (24/25)
Acquistions ACHA 5 Year 1 (24/25)
Tighcargaman, Port Ellen ACHA 50 Year 2 (25/26)
East Clyde Street, Helensburgh  ACHA 14 Year 2 (25/26)
Coll ACHA 10 Year 2 (25/26)
Acquistions ACHA 10 Year 2 (25/26)
Glenmachrie, Islay ACHA 10 Year 3 (26/27)
Tarbert Phase 1  ACHA 15 Year 3 (26/27)
Kilcreggan  ACHA 10 Year 3 (26/27)
Tayvallich ACHA 10 Year 3 (26/27)
Dunoon Phase 1  ACHA 35 Year 3 (26/27)
Keils, ISLAY ACHA 4 Year 4 (27/28)
Tarbert Phase 2  ACHA 15 Year 4 (27/28)
Tiree ACHA 10 Year 4 (27/28)
Dunoon Phase 2  ACHA 35 Year 4 (27/28)
Dunoon Phase 3  ACHA 30 Year 5 (28/29)
Dunoon Phase 4   ACHA 20 Year 5 (28/29)
Jeanie Deans, Helensburgh DUNBRITTON HA 12 Year 1 (24/25)
18th Tee, Helensburgh Golf Club DUNBRITTON HA 16 Year 2 (25/26)
Cardross DUNBRITTON HA 35 Year 3 (26/27)
Helensburgh Golf Club DUNBRITTON HA 62 Year 5 (28/29)
Succoth Phase 2, Arrochar DUNBRITTON HA 12 Year 5 (28/29)
Riverside Drive, Lochgilphead
(Baddens) FYNE HOMES  6 Year 1 (24/25)
Ballochgoy FYNE HOMES 8 Year 1 (24/25)
Rothesay - acquisition  FYNE HOMES  8 Year 1 (24/25)
Inveraray Phase 1 FYNE HOMES  16 Year 2 (25/26)
Rothesay Academy FYNE HOMES 50 Year 4 (27/28)
Lochgilphead Phase 6 FYNE HOMES 80 Year 4 (27/28)
Inveraray Phase 2 FYNE HOMES 10 Year 4 (27/28)
Rothesay Academy Phase 2 FYNE HOMES 30 Year 5 (28/29)
Tighnabruaich Phase 2 FYNE HOMES  10 Year 5 (28/29)
Rosneath LINK GROUP 49 Year 2 (25/26)
Hospital Field, Oban LINK GROUP 50 Year 3 (26/27)
Dunbeg Phase 4 LINK GROUP 129 Year 3 (26/27)
Glencruitten LINK GROUP 100 Year 3 (26/27)
Dunbeg Phase 5 LINK GROUP 97 Year 4 (27/28)
Dunbeg Phase 6 LINK GROUP 123 Year 5 (28/29)
Colonsay WHHA 5 Year 1 (24/25)
Port Charlotte Phase 1 WHHA 16 Year 2 (25/26)
Imeraval Phase 5 WHHA 20 Year 2 (25/26)
Tobermory Shillinghill Phase 3 WHHA 10 Year 2 (25/26)
Dalmally WHHA 16 Year 2 (25/26)
Salen WHHA 8 Year 4 (27/28)

Page 42

41 
Lochawe Phase 1 WHHA 16 Year 4 (27/28)
Baliscate, Tobermory WHHA 12 Year 5 (28/29)
Port Appin Phase 2/3 WHHA 24 Year 5 (28/29)
Bunessan Phase 2 WHHA 4 Year 5 (28/29)
Port Charlotte Phase 2 WHHA 17 Year 5 (28/29)
Craignure  WHHA 24 Year 5 (28/29)
Argyll and Bute Total 1395 2024-2029 
1 NB. Timescales are indicative and subject to change; and will be monitored regularly.
Some projects could also revise their final number of units. 
RSLs have also identified future opportunities, which they will continue to develop.
These projects could be included in the later years of the SHIP. For example, ACHA
is exploring options for sites in Helensburgh, Dunoon, Kilcreggan, Tiree and on Mull
such as Dervaig, and Ulva, as well as further development sites on Islay. WHHA are
considering sites in Oban town centre, and options for Kilchrenan, as well as Lochawe
Phase 2 which will be in future SHIP. Dunbritton are keen to deliver more units in the
Helensburgh area and exploring site opportunities.  LINK Group continue to work
closely with WHHA and are scoping options for development sites in Oban. In addition,
the Council are working with Trust Housing Association to deliver improvements to
their existing stock in Strachur which will meet identified need and demand in the area. 
Finally, a number of community-led projects or private developments with associated
affordable requirements, may be delivered out with the core SHIP programme and
should deliver major synergies with the SHIP. Several community projects are
progressing, and while small in scale these community-based projects deliver
substantial impacts at the local level, and help to ensure the viability and sustainability
of fragile communities. The following table summarises the work being undertaken by
our Community Housing Network partners on rural and island projects out with the
core SHIP programme.

Page 43

42 
TABLE 16: PROPOSED/POTENTIAL COMMUNITY-LED HOUSING PROJECTS 
ARGYLL AND BUTE - COMMUNITY LED HOUSING PROJECTS
COMMUNITY
GROUP
PROJECT
AREA NOTES ON PROJECT STAGE TOTAL UNITS 
(if relevant)
Colonsay
community
Development
Scalasaig, Isle
of Colonsay
Houses complete bar commissioning,
external works stalled
9 units + 3 self
build plots
Luing
Community Isle of Luing
Finalising Housing Needs
Assessment. Detailed housing
proposals prepared and to be
submitted in Local Place Plan
12
Mull and Iona
Community
Trust
Worker
Accommodation
Report commissioned to determine
scale of housing issue n/a
Worker
Accommodation
Tobermory
Supporting A & B Council in the
provision of worker accommodation in
Tobermory
12
Glengorm
affordable
housing
MICT supporting the Glengorm estate
with their allocations policy for their
affordable housing
5
South West
Mull and Iona
Development
Ardmeanach
View Bunessan
Working with WHHA demonstrating
Feasibility 6
Bunessan
Village
Exploring feasibility of site, funding for
site purchase 5 or 6
Tiree
Community
Development 
Tiree SLF Stage 1 approved, awaiting RIHF 12
Isle of Gigha
Heritage Trust Ardminish  Expected completion: July 2024 5
North West
Mull  Isle of Ulva Post Construction Management  
Tayvallich
Initiative
Gifted Property,
Tayvallich 
About to advertise and allocate this 2
bed property 1
Farmhouse,
Tayvallich
About to take ownership of this 4 bed
property which is currently tenanted  1
Archie's Land,
Tayvallich 
Housing needs assessment
completed. In discussions with
housing agencies regarding different
models. Further feasibility works
required and to engage with planning 
10 
15. MONITORING, REVIEW AND IMPACT ASSESSMENTS 
The SHIP will continue to be appraised on an annual basis by the Scottish Government
and affordable housing outcomes are monitored regularly by the Council’s Housing
Management Team; local authority Members via the corporate Pyramid performance
management system; the overarching Community Planning Partnership via the ABOIP

Page 44

43 
framework; and partners on the Strategic Housing Forum; as well as the boards and
committees of the individual SHIP partners. In addition, as appropriate, wider stakeholder
involvement will be sought via consultation with local communities, private developers
and relevant particular interest groups. All pertinent feedback will help to inform the
ongoing development and regular revisions of the SHIP.                  
The council has also been exploring potential mechanisms for establishing a wider
evaluation framework to capture the broader social return on investment and economic
impacts of the SHIP programme, as well as the basic cost effectiveness and value for
money of specific projects. Working with RSL partners, the council is keen to implement
a formal evaluation procedure which will capture evidence on the wide range of strategic
benefits that the SHIP actually delivers, beyond monitoring the basic number of
completions. 
In 2021/22, the council undertook a number of impact assessments during the LHS
process. The SHIP is an investment plan which sits underneath the LHS and sets out
how the LHS objectives can be delivered. Therefore, these impact assessments also
inform the SHIP. The impact assessments can be found on the council’s website. 
 Equality and Socio-Economic Impact Assessment lhs_eqseia_sept_2021.pdf
(argyll-bute.gov.uk)
 Child Rights and Wellbeing Impact Assessment
childrens_rights_and_wellbeing_impact_acccessment_stage_abc_lhs_jan_202
2.pdf (argyll-bute.gov.uk)
 Health Impact Assessment APPENDIX 4: Template for scoping workshop
reports (argyll-bute.gov.uk)
 Islands and Communities Impact Assessment
lhs_island_communities_impact_assessment.pdf (argyll-bute.gov.uk)   
In future, the council will monitor and assess the impact of the SHIP and the LHS in
terms of the aforementioned impact assessments and in line with the principles of the
Fairer Scotland Duty. Any relevant findings from such assessments will be reflected in
the SHIP and future updates of the LHS and other associated plans, policies and
strategies. 
Strategic Environmental Assessment (SEA)
As the “Responsible Authority” under the terms of the Environmental (Scotland) Act
2005, the council has previously determined that the LHS (and by association it’s
ancillary component, the SHIP) does not require a full SEA.
sea_pre_screening_report_october_2021.pdf (argyll-bute.gov.uk) 
The primary document in relation to land use planning is the Local Development Plan
which is subject to a full SEA and which will ultimately cover all housing projects set
out in the SHIP.

Page 45

44 
CONCLUSION 
The Argyll and Bute Strategic Housing Investment Plan for 2024/25 to 2028/298 sets out
an ambitious but realistic programme for the delivery of 1,395 new affordable homes; of
which the majority would be built to lifetime standards, allowing for future adaptation to
meet changing needs over time; and around 10% will be purpose-designed for specialist
needs, with half of those i.e., 5% of the total being fully wheelchair accessible. The
programme reflects a strong commitment to Argyll and Bute’s economic growth agenda
and will directly support the sustainability of fragile rural and island communities. 
The earlier years of the SHIP align with the LHS housing supply targets, published in
2022, of 215 new affordable homes per year; the later years are slightly below the target.
Several additional potential projects have also been suggested and are at an early stage
of development. These projects are likely to be considerations in later years, although if
needs are identified during the annual review of the programme, then these projects
could be brought forward.  In addition, the Council and partners continue to seek new
opportunities which could raise the number of units in the later years of the SHIP to align
with the 5 year LHS target of 1075 affordable units. 
The LHS targets take account of the council’s ambitious strategic objectives as well as
the potential increased demand for social housing arising from the current economic
crisis and other worldwide events; the anticipated impacts of the Rural Growth Deal and
other local and national resources and strategic imperatives for repopulation, recovery
and growth; and therefore the scale of the proposed programme is likely to be more in
line with actual requirements as well as our aspirational goals for Argyll and Bute. 
This SHIP clearly and directly aligns with the LHS and Argyll and Bute Outcome
Improvement Plan (ABOIP) outcomes; sets out a core programme which is feasible to
deliver; highlights the contribution of the council, developers and other partners;
evidences the support and facilitation role of the local authority; outlines the extensive
stakeholder engagement underpinning the planning and delivery of the programme; and
explicitly reflects the central importance of equality issues for all partners.

Page 46

45 
Appendix 1 - Individual Open Market Purchases Statement January 2022 
Scottish Government affordable housing supply guidance states:-
“It is expected that the majority of homes delivered through the Programme will be
new build units that are delivered either directly by grant applicants or through ‘off the
shelf’ purchases from developers. However, where it can be demonstrated that the
use of grant to acquire ‘second hand’ stock that is for sale on the open market
is the most appropriate method of meeting housing need in a particular area,
subsidy may be available to fund this, subject to agreement between the Council
and the Scottish Government. Funding may also be made available to remodel/
rehabilitate existing properties where this is considered a strategic priority”. 
Argyll and Bute Council will consider a limited number of individual, second hand
open market purchases if the following criteria are met: 
 There is a need for the size and type of housing in the town/settlement, (this
will be determined by the current housing need and demand assessment) 
 Land availability and infrastructure issues are a barrier to delivering the
affordable housing target in the area through new build development
 The purchase will not result in homelessness
 The purchase price must reflect the condition of the property. 
Second hand open market purchases will be prioritised as follows: 
1. Where the purchase will assist the RSL to meet general housing need as   
identified in the HNDA and agreed with Argyll and Bute Council.
2. Where the purchase will assist the RSL to meet particular housing need as agreed
with Argyll and Bute Council.
3. Where the purchase will bring an empty property back into occupation
4. Priority will be given to acquiring properties that are in good/reasonable condition. 
Each property will require a valuation and condition survey completed by the District
Valuer or other RICS Chartered Surveyor. Vendors must pay their own costs. 
Applicants should note the following:-
 Grant requested must be the minimum level of grant required to deliver the
project.
 Grant requested should exclude costs for any works normally funded by the
Association’s capital maintenance/cyclical programme.
 Streamlined submissions for acquisition only, the maximum Scottish
Government grant will be up to £50,000 or 50% of the acquisition value,
whichever is the lower.
 Streamlined submissions for acquisition and works, grant will be up to
£75,000 maximum for each property. This will encompass the purchase price
and any works required to the property.
 Where grant required for acquisition and works cost is higher than £75,000 a
full value for money appraisal will be required and acquisitions should not be
completed before confirmation of Scottish Government and Council
agreement on the level of costs.

Page 47

46 
APPENDIX 2 - SHIP DEVELOPMENTS ACROSS ARGYLL & BUTE: 
Projects in the Core Programme 2024-2029

Page 48

47 
THIS DOCUMENT IS
AVAILABLE ON THE COUNCIL WEBSITE AT: 
Local Housing Strategy and Housing Need and Demand Assessment   
This document can also be made available in other formats on request. 
Contact:
LHS Team
Argyll & Bute Council
Argyll House, Alexandra Parade 
Dunoon PA23 8AJ 
Telephone: 
01546 604785
01369 708672
Email: localhousingstrategy@argyll-bute.gov.uk