Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
15 February 2024 
NOTICE OF MEETING 
A meeting of ARGYLL AND BUTE COUNCIL will be held ON A HYBRID BASIS IN THE
COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on
THURSDAY, 22 FEBRUARY 2024 at 10:30 AM, or at the conclusion of the Special meeting of
Argyll and Bute Council at 10.00am on the same date, whichever is the later, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 5 - 14)  
Argyll and Bute Council held on 23 November 2023 
4. MINUTES OF COMMITTEES 
(a) Environment, Development and Infrastructure Committee held on 30
November 2023 (Pages 15 - 20)
*  (b) Policy and Resources Committee held on 7 December 2023 (Pages 21 - 26)  
(c) Community Services Committee held on 14 December 2023 (Pages 27 - 32)
*  (d) Policy and Resources Committee held on 15 February 2024 (Pages 33 - 40) 
The above minutes are submitted to the Council for approval of any recommendations on the
items which the Committee does not have delegated powers. These items are marked with an *. 
5. BUDGETING PACK 2024/25 
Reports by Section 95 Officer 
Please note that the Budget Pack 2024-2025 relative to the consideration of the
foregoing matters has been published separately under a meeting entitled “Budget
Public Document Pack

Page 2

Pack”, please ensure that you have downloaded this to your iPad before coming to
the meeting. 
The budget pack will stand alone and will be published here separately from the
Policy and Resources Committee and Council agendas. This will enable the same
pack to be accessed at all meetings. 
Accessing the Budget Pack from your iPad –
To access this years’ Budgeting Pack 2024/25 Members should log into the
Modern.Gov App on their iPad and tap the cog symbol on the top right hand side of
the screen. In the next screen, tap the “Select Committees of Interest” option, scroll
down until you find the Budget Pack. Tap on this line and a tick should appear
opposite the Budget Pack to show that you have made your selection. Click “OK” at
the bottom right hand side of the screen. This should now appear on your list of
Committees. 
6. TREASURY MANAGEMENT STRATEGY AND ANNUAL INVESTMENT
STRATEGY (Pages 41 - 98)  
Report by Section 95 Officer 
7. ANNUAL ACCOUNTS 2022-23 UPDATE (Pages 99 - 102)  
Report by Section 95 Officer 
8. POLITICAL MANAGEMENT ARRANGEMENTS (Pages 103 - 112)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
9. APPOINTMENT OF INDEPENDENT AUDIT AND SCRUTINY CHAIRPERSON
(Pages 113 - 114)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
10. DEMOCRACY MATTERS 2 - CONSULTATION RESPONSE (Pages 115 - 134)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
11. PROPOSED LOCAL DEVELOPMENT PLAN 2 SCOTTISH GOVERNMENT
DIRECTION (Pages 135 - 142)  
Report by Executive Director with responsibility for Development and Economic
Growth 
12. HOUSING EMERGENCY WORKER ACCOMMODATION PROPOSALS 
(Pages 143 - 152)  
Report by Executive Director with responsibility for Development and Economic Growth 
REPORTS FOR NOTING 
13. COUNCIL ANNUAL REPORT 2022/2023 (Pages 153 - 228)  
Report by Chief Executive 
14. SCOTTISH GOVERNMENT CALL FOR NEW NATIONAL PARK NOMINATIONS
(Pages 229 - 238)  
Report by Executive Director with responsibility for Development and Economic
Growth

Page 3

Argyll and Bute Council 
Councillor John Armour Councillor Gordon Blair
Councillor Jan Brown Councillor Math Campbell-Sturgess
Councillor Garret Corner Councillor Maurice Corry (Chair)
Councillor Robin Currie Councillor Audrey Forrest
Councillor Kieron Green Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Willie Hume
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Jennifer Kelly 
Councillor Reeni Kennedy-Boyle Councillor Jim Lynch
Councillor Luna Martin Councillor Tommy MacPherson
Councillor Ian MacQuire Councillor Liz McCabe
Councillor Dougie McFadzean Councillor Julie McKenzie
Councillor Yvonne McNeilly Councillor Ross Moreland
Councillor Gary Mulvaney Councillor Iain Paterson
Councillor Gemma Penfold Councillor Dougie Philand
Councillor Alastair Redman Councillor William Sinclair
Councillor Peter Wallace Councillor Andrew Vennard 
Contact: Hazel MacInnes  Tel:01546 604269

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of ARGYLL AND BUTE COUNCIL held ON A HYBRID BASIS IN THE
COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 23 NOVEMBER 2023 
Present: Councillor Maurice Corry (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Math Campbell-Sturgess
Councillor Garret Corner
Councillor Robin Currie
Councillor Audrey Forrest
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Fiona Howard
Councillor Willie Hume
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Paul Donald Kennedy 
Councillor Reeni Kennedy-Boyle
Councillor Jim Lynch
Councillor Luna Martin
Councillor Tommy MacPherson
Councillor Ian MacQuire
Councillor Liz McCabe
Councillor Dougie McFadzean
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gemma Penfold
Councillor Dougie Philand
Councillor Alastair Redman
Councillor William Sinclair
Councillor Peter Wallace
Councillor Andrew Vennard
Councillor Jennifer Kelly 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Fiona Davies, Chief Officer, Health and Social Care Partnership
David Logan, Head of Legal and Regulatory Support
Fergus Murray, Head of Development and Economic Growth
Anne Blue, Head of Financial Services
Shona Barton, Governance Manager
Matt Mulderrig, Development Policy and Housing Manager
Fergus Walker, Revenues and Benefits Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were intimated on behalf of Councillors Julie McKenzie, Gary
Mulvaney and Iain Shonny Paterson.   
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated.   
3. MINUTES 
The Minute of the meeting of Argyll and Bute Council, held on 28 September 2023 was
approved as a correct record.   
Page 5 Agenda Item 3

Page 6

4. MINUTES OF COMMITTEES 
(a) Policy and Resources Committee held on 12 October 2023 
The Minute of the meeting of the Policy and Resources Committee, held on 12
October 2023 was noted. 
Arising from item 4 of this Minute (Financial Reports Monitoring Pack – 31 August
2023) the Council approved the revenue virements over £0.200m during July and
August. 
Arising from item 5 of this Minute (Budget Outlook 2024-25 to 2028-29) the Council
agreed that the budget for winter maintenance was right sized by utilising £0.326m
of the £1.4m contingency that was set aside for inflationary increases as part of the
2023-24 budget setting process. 
5. LEADER'S REPORT 
The Council gave consideration to a report providing an update on the activities of the
Council Leader, Councillor Robin Currie for the period 8 September to 10 November 2023. 
The report also included notes on activities relating to the Leader’s Policy Lead portfolio of
Strategic Development. 
The Leader noted the recent announcement by the Chancellor of the Exchequer in his
Autumn Statement that there would be £80 million of Levelling Up Funding allocated to 4
Local Authority Areas in Scotland.  He further advised that confirmation has now been
received that Argyll and Bute will be one of the areas to benefit from this funding
allocation.   
Decision 
The Council – 
1. noted the content of the report; and 
2. noted that any reports, briefings or copy correspondence referred to in the report could
be requested as appropriate through the Leadership Support Manager, noting that
some confidential reports provided by external organisations such as COSLA may be
restricted. 
(Reference:  Report by Leader of the Council, dated 10 November 2023, submitted) 
6. POLICY LEADS REPORT 
The Council gave consideration to a report providing an update on key areas of activity for
each Policy Lead Councillor for the period 28 September to 10 November 2023.  The
report aimed to provide updates from all Policy Leads to ensure that all members were
informed, up to date and able to engage with current issues. 
Decision 
The Council agreed to note the content of the report.   
Page 6

Page 7

(Reference:  Report by Policy Lead Councillors dated 10 November 2023, submitted) 
7. WARD 1 SOUTH KINTYRE  BY-ELECTION RESULT 
The Council gave consideration to a report advising of the results of the Ward 1 – South
Kintyre By-election held on 2 November 2023. 
Decision 
The Council noted the election of Jennifer Mary Kelly as Councillor in Ward 1 – South
Kintyre at the by-election held on 2 November 2023. 
(Reference:  Report by Returning Officer dated 3 November 2023, submitted) 
8. POLITICAL MANAGEMENT ARRANGEMENTS 
The Council gave consideration to a report which outlined a number of vacancies on
committees and other organisations and included an update on the Political Composition
of the Council following the By-election in Ward 1, South Kintyre, which took place on 2
November 2023.   
The Executive Director with responsibility for Legal and Regulatory Support noted that the
Political Composition of the Council included at Appendix 1 should reflect that Councillor
Dougie Philand was now the only member of Argyll First and as such the reference to him
being Leader of that Group should be removed. 
Motion 
The Council: 
1. Appoints Councillor Graham Hardie to the vacant position on the Environment,
Development and Infrastructure Committee. 
2. Appoints Councillor William Sinclair as one of the council’s representatives on the A83
Taskforce. 
3. Agrees that Councillor Fiona Howard will replace Councillor Ian MacQuire on the Argyll
and Bute Harbour Board. 
4. Notes that Councillor Jennifer Kelly will become a Trustee for the Campbeltown
Common Good Fund and the Kintyre Education Trust. 
5. Notes the updated Political Composition of the Council. 
Moved by Councillor Robin Currie, seconded by Councillor Yvonne McNeilly. 
Amendment 
The Council: 
1. Appoints Councillor Jennifer Kelly to the vacant position on the Environment,
Development and Infrastructure Committee.
Page 7

Page 8

2. Appoints Councillor John Armour as one of the council’s representatives on the A83
Taskforce. 
3. Agrees that Cllr Fiona Howard will replace Councillor Ian MacQuire on the Argyll and
Bute Harbour Board. 
4. Notes that Councillor Jennifer Kelly will become a Trustee for the Campbeltown
Common Good Fund and the Kintyre Education Trust. 
5. Notes the updated Political Composition of the Council. 
Moved by Councillor Jim Lynch, seconded by Councillor John Armour. 
As the meeting was being held on a hybrid basis, the vote required to be taken by calling
the Roll and Members voted as follows – 
Motion    Amendment   
Councillor Garret Corner  Councillor John Armour
Councillor Maurice Corry  Councillor Gordon Blair
Councillor Robin Currie  Councillor Jan Brown
Councillor Kieron Green  Councillor Math Campbell-Sturgess
Councillor Amanda Hampsey Councillor Audrey Forrest
Councillor Daniel Hampsey Councillor Fiona Howard
Councillor Graham Hardie  Councillor Willie Hume
Councillor Andrew Kain  Councillor Mark Irvine
Councillor Paul Donald Kennedy Councillor Jennifer Kelly
Councillor Liz McCabe  Councillor Reeni Kennedy-Boyle
Councillor Yvonne McNeilly Councillor Jim Lynch
Councillor Ross Moreland  Councillor Luna Martin
Councillor Gemma Penfold  Councillor Ian MacQuire
Councillor Alastair Redman Councillor Dougie McFadzean
Councillor William Sinclair  Councillor Dougie Philand
Councillor Andrew Vennard 
Councillor Peter Wallace 
No Vote 
Councillor Tommy McPherson   
Decision 
The Motion was carried by 17 votes to 15 and the Council resolved accordingly.   
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support, dated 6 November 2023, submitted) 
Page 8

Page 9

9. DRAFT PROGRAMME OF MEETINGS 2024-25 
The Council’s Standing Orders for meetings require the Council to approve a Programme
of Meetings for the Council and its Committees every year. The Council gave
consideration to a draft programme of meetings for the year 2024-25 based on the current
committee cycle. 
Decision 
The Council approved the draft Programme of Meetings for the year 2024-25. 
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support dated 15 November 2023, submitted) 
10. REVIEW OF POLLING DISTRICTS AND POLLING PLACES 2023/24 
Having noted that the Representation of the People Act 1983 and the Electoral
Registration and Administration Act 2013 requires Argyll and Bute Council to undertake a
review, between the dates of 2 October 2023 and 28 January 2025, of polling districts and
polling places within the Argyll and Bute area for the purposes of the UK Parliamentary,
Scottish Government and Local Government elections, the Council gave consideration to
a report which provided information on the work carried out to date in this regard. 
Decision 
The Council – 
1. noted that polling districts and polling places will continue to be reviewed on an on-
going basis by the Returning Officer to whom authority has already been delegated to
make alterations in response to changing circumstances; 
2. noted that under the provisions of the Electoral Registration and Administration Act
2013 a further formal review of polling districts and polling places will require to be
carried out by the end of January 2030 and on a 5 yearly basis thereafter; 
3. approved the Scheme of Polling Districts and Polling Places detailed in appendix 1 of
the report; and 
4. noted the representations received during the consultation period, as detailed in
appendix 2 of the report, together with the Returning Officer comments thereon.   
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support, dated November 2023, submitted) 
11. POLICY FOR EMPTY PROPERTY RELIEF FOR NON-DOMESTIC RATES 
Consideration was given to a report which provided an update on progress being made
with regard to a new Empty Property Relief Policy on Non-Domestic Rates.  It was noted
that the purpose of this is to incentivise the owners of empty business premises in Argyll
and Bute to do all that they can to bring the property back into use.   
Decision 
Page 9

Page 10

The Council – 
1. approved Option A, Empty Property Relief provisions as outlined in paragraph 3.19 of
the report; 
2. agreed the creation of an Empty Property Officer post for a period of 2 years as
outlined in paragraph 3.21 of the report; and 
3. agreed that the remaining Empty Property Relief funding is used towards a Business
Grant Scheme with officers to bring forward the detail to the Environment,
Development and Infrastructure Committee meeting in March 2024 for approval. 
(Reference:  Report by Executive Director with responsibility for Financial Services, dated
25 October 2023, submitted)   
12. CHARGING OF DOUBLE COUNCIL TAX ON SECOND HOMES 
The Council gave consideration to a report which outlined the Scottish Government
consultation on Council Tax charges for Second Homes and Long-Term Empty properties,
which ran from 17 April to 11 July 2023.  The report provided information on the review of
the consultation results and the proposed changes for consideration by Leaders and
Ministers.   
Decision 
The Council – 
1. agreed to implement the double charge, 100% Council Tax premium on second homes
from 1 April 2024 should the legislation granting those powers be passed; and 
2. agreed that £0.020m of one-off costs are funded from existing earmarkings within the
Service that are no longer required and recurring costs of £0.098m for staffing and
system maintenance associated with the implementation of this charge be funded from
the additional income recovered in excess of the £4m already built into the Budget
Outlook.   
(Reference:  Report by Executive Director with responsibility for Financial Services, dated
25 October 2023, submitted) 
13. ROYAL NATIONAL MOD - OBAN FUNDING REQUEST 
Having noted that the Royal National Mod (RNM) will take place from 11 – 19 October
2024 in Oban and the significant economic impact expected for Oban as a result, the
Council gave consideration to a report which outlined the requests for additional funding
from both Live Argyll and An Comunn Gaidhealach (An Commun). 
Decision 
The Council – 
1. agreed a financial resource of up to £25,000 to Live Argyll to provide staffing for the
use of the Corran Halls for the duration of the RNM to be funded from the unallocated
general fund; and 
Page 10

Page 11

2. agreed the additional funding request of up to a maximum of £20,000 to An Commun
to be funded from the unallocated general fund.   
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth, dated October 2023, submitted) 
14. STRATEGIC HOUSING INVESTMENT PLAN (SHIP) 2024/25 TO 2028/29 
Consideration was given to a report which provided details of the annual Strategic
Housing Investment Plan (SHIP) covering the period 2024/25 – 2028/29 and summarised
the proposals for the revised SHIP, in line with statutory requirements and the latest
guidance.   
Decision 
The Council approved the Strategic Housing Improvement Plan for 2024/25 – 2028/29,
and noted that this will be submitted to the Scottish Government as the Council’s
approved Strategic Housing Improvement Plan document.   
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth, dated November 2023, submitted) 
15. NOTICE OF MOTION UNDER STANDING ORDER 13 
The Council gave consideration to the following Notice of Motion under Standing Order 13
that had been submitted by Councillor Audrey Forrest, and seconded by Councillor
Dougie McFadzean – 
The UNCRC is an international treaty made up of 54 articles that aims to articulate the
‘civil, political, economic, social and cultural rights that all children everywhere are entitled
to’, as well as the steps that governments must take to secure these rights. 
The UK ratified the UNCRC in 1991, and legislation has been enacted by the Scottish
Parliament which will see these rights enshrined in Scots Law. 
The Council, as a body, who has responsibilities for children and young people should act
consistently with the UNCRC, and as a forward thinking body, reaffirms its aspiration and
responsibility to continue to try to ‘Get It Right For Every Child’ in all aspects of its
business. It acknowledges that it is not only in Education that Children’s Rights are
important but that all parts of the Council business can impact on our children and young
people and that they should be considered in all decision making processes. 
Therefore, Council agrees to add ‘The Rights of The Child’ as a field to be completed to
the Implications section at the end of all Council and Committee reports. 
Decision 
The Council agreed the terms of the Motion. 
(Reference:  Notice of Motion under Standing Order 13 by Councillor Audrey Forrest,
seconded by Councillor Dougie McFadzean, submitted) 
Page 11

Page 12

16. NOTICE OF MOTION UNDER STANDING ORDER 13 
The Council gave consideration to the following Notice of Motion under Standing Order 13
that had been submitted by Councillor Jim Lynch, and seconded by Councillor Robin
Currie – 
It is almost a decade since Scotland’s last appearance in golf’s prestigious Ryder Cup
tournament. This year, though, a young golfer from Oban gave the traditional home of golf
an opportunity to be part of it and to celebrate again as he played his part in Team’s
Europe’s Ryder Cup victory. 
Robert MacIntyre is undoubtedly one of golf’s most amazing young talents on an
international level and is certainly one of the finest players that Scotland has seen in many
years. At the age of 27, his list of sporting achievements is considerable and inspirational. 
Despite his amazing success, his commitment and attachment to his home town of Oban
remains as strong and enthusiastic as it was when he first started his golf career at
Glencruitten Golf Club, where he is still a member. 
He is a tremendous ambassador for Scotland and for Oban in particular, and the town is
especially – and rightly - proud of its famous sporting son. 
In recognition of his sporting success, and his commitment to his local community of
Oban, Council is asked to consider awarding the Freedom of Argyll and Bute to Robert
MacIntyre and, if so minded, to request that the Executive Director with responsibility for
Legal and Regulatory Support makes the necessary arrangements in this regard. 
Decision 
The Council agreed the terms of the Motion. 
(Reference:  Notice of Motion under Standing Order 13 by Councillor Jim Lynch,
seconded by Councillor Robin Currie, submitted) 
17. NOTICE OF MOTION UNDER STANDING ORDER 13 
The Council gave consideration to the following Notice of Motion under Standing Order 13
that had been submitted by Councillor Gordon Blair, and seconded by Councillor Mark
Irvine. 
Motion 
Argyll and Bute Council, already home to refugees from across the world, calls on the UK
Government to fully support a cease fire in Gaza and support the immediate
establishment of a humanitarian corridor for the displaced and the distribution of essential
supplies of food and life-saving medication.    
The people of Argyll and Bute will continue to support refugees in our communities in a
caring, peaceful, just and fair society. 
Page 12

Page 13

Amendment 
Argyll and Bute Council are dismayed to see the situation in the Middle East and call on
the International Community to continue to engage in constructive dialogue to reach a
solution to this fast moving situation as quickly as possible. 
Argyll and Bute Council continue to support refugees in our communities through the
Refugee Resettlement Programme and welcome the multi-agency partnership approach
to integration support across the authority to ensure they are enabled to fully participate in
community life. 
Moved by Councillor Andrew Kain, seconded by Councillor Yvonne McNeilly. 
As the meeting was being held on a hybrid basis, the vote required to be taken by calling
the Roll and Members voted as follows – 
Motion     Amendment 
Councillor John Armour   Councillor Garret Corner
Councillor Gordon Blair   Councillor Maurice Corry
Councillor Jan Brown   Councillor Robin Currie
Councillor Math Campbell-Sturgess  Councillor Kieron Green
Councillor Audrey Forrest   Councillor Amanda Hampsey
Councillor Fiona Howard   Councillor Daniel Hampsey
Councillor Willie Hume   Councillor Graham Hardie
Councillor Mark Irvine   Councillor Andrew Kain
Councillor Jennifer Kelly   Councillor Paul Donald Kennedy
Councillor Reeni Kennedy-Boyle  Councillor Liz McCabe
Councillor Jim Lynch   Councillor Yvonne McNeilly
Councillor Luna Martin   Councillor Ross Moreland
Councillor Ian MacQuire   Councillor Gemma Penfold
Councillor Dougie McFadzean  Councillor Alastair Redman
Councillor Dougie Philand   Councillor William Sinclair      
Councillor Andrew Vennard      
Councillor Peter Wallace 
No Vote 
Councillor Tommy McPherson 
Decision 
The Amendment was carried by 17 votes to 15 and the Council resolved accordingly.   
(Reference:  Notice of Motion under Standing Order 13 by Councillor Gordon Blair,
seconded by Councillor Mark Irvine, submitted) 
.
The Council resolved in terms of Section 50(A)(4) of the Local Government (Scotland) Act
1973 to exclude the press and public for the following item of business on the grounds that
it was likely to involve the disclosure of exempt information as defined in Paragraph 1 of
Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
.
Page 13

Page 14

18. COUNCIL CONSIDERATION OF ABSENCE 
The Council gave consideration to a report seeking approval of an ongoing absence from
Council business of an elected member for a period up to 29 June 2024. 
Decision 
The Council approved the absence from Council business of an elected member until 29
June 2024, or until their return to business, whichever is the earlier. 
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
support dated 6 October 2023, submitted) 
Page 14

Page 15

MINUTES of MEETING of ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY,
LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 30 NOVEMBER 2023 
Present: Councillor Robin Currie (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Garret Corner
Councillor Graham Hardie
Councillor Andrew Kain
Councillor Jim Lynch
Councillor Tommy MacPherson 
Councillor Ian MacQuire
Councillor Luna Martin
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor William Sinclair
Councillor Andrew Vennard
Councillor Peter Wallace 
Also Present: Councillor Paul Kennedy 
Attending: Kirsty Flanagan, Executive Director
Fergus Murray, Head of Development and Economic Growth
Jim Smith, Head of Roads and Infrastructure Services
Stuart McLean, Committee Manager
Matt Mulderrig, Development Policy and Housing Manager 
The Chair welcomed Councillor Graham Hardie to his first meeting of the Committee
following his appointment at the Council meeting on 23 November 2023. 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Mark Irvine. 
2. DECLARATIONS OF INTEREST 
In relation to item 6 of the agenda (Helensburgh Wooden Pier - Update) Councillor Ian
MacQuire noted a connection due to his membership on the Helensburgh Seafront
Development Trust (HSDT), he advised that as the Group was currently dissolving he
would remain in the meeting during the consideration of this item of Business. 
3. MINUTES 
The Minutes of the meeting of the Environment, Development and Infrastructure
Committee held on 31 August 2023 were approved as a correct record. 
4. LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER
ACTIONS 
The Committee gave consideration to a report providing an update on the progress of the
Settlement Project Support Officer actions that had been approved by the Committee at
their meeting on 31 August 2023. 
Page 15 Agenda Item 4a

Page 16

Decision 
The Environment, Development and Infrastructure Committee noted – 
1. the progress on the actions agreed by the Environment, Development and
Infrastructure Committee on 31 August 2023; and 
2. that a further update would be provided on the work of the Settlement Project Support
Officer at the next Environment, Development and Infrastructure Committee. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated November 2023, submitted) 
Councillor Luna Martin joined the meeting during the consideration of the following item of
Business. 
5. ARGYLL AND BUTE HOUSING EMERGENCY 
(a) Progress Report 
The Committee gave consideration to a report providing an update on progress
towards intentions agreed by the Committee in June 2023 in response to the
Housing Emergency in Argyll and Bute. 
Decision 
The Environment, Development and Infrastructure Committee noted the activity and
progress that was ongoing in pursuing the intentions agreed by the Committee in
June 2023 which sought to address the Housing Emergency. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated October 2023, submitted) 
(b) Project Officer Resource 
The Committee gave consideration to a report proposing the allocation of a Project
Officer to accelerate the progress of the interventions agreed by the Committee in
June 2023 to address the Housing Emergency in Argyll and Bute. 
Decision 
The Environment, Development and Infrastructure Committee agreed to recommend
to the Policy and Resources Committee that the Council recruit a Project Officer to
assist in accelerating the work to address the Housing Emergency, with funding for
the post being drawn from the Council’s Priorities Investment Fund. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated October 2023, submitted) 
Page 16

Page 17

6. HELENSBURGH WOODEN PIER - UPDATE 
The Committee gave consideration to a report providing an update following the decision
to remove Helensburgh Wooden Pier from the project options within the Rural Growth
Deal Tourism and Place Programme. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. accepted the Consultants findings, particularly that a berthing facility at Helensburgh
Pier could not be operated on a revenue neutral basis, particularly where long-term
capital replacement costs were accounted for, and that officers would no longer devote
resources to pursuing a Council funded berthing facility; and 
2. agreed that the Head of Development and Economic Growth would engage with
Helensburgh Community Council and any other appropriate community group(s) who
may express a wish to pursue options, including a potential asset transfer of
Helensburgh Wooden Pier. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated November 2023, submitted) 
Councillor Andrew Vennard joined the meeting during the consideration of the following
item of Business. 
7. WASTE UPDATE 
The Committee gave consideration to a report providing an update on a number of waste
related matters including meetings with the Scottish Environment Protection agency
(SEPA) on 4 October 2023, and with Scottish Government officials on 6 October 2023 in
respect of the Waste PPP contract. 
Decision 
The Environment, Development and Infrastructure Committee noted – 
1. the update regarding meetings held with SEPA on the Waste PPP contract; 
2. that officers would conclude conversations which were ongoing regarding the
derogation and would bring a further report to the next meeting of the Committee for a
decision on the way forward for the Council; 
3. the update regarding Persistent Organic Pollutants and noted the date of
implementation of compliance with SEPA mandatory guidance as 1 November 2023; 
4. the bid to the Recycling Infrastructure Fund and officers’ achievement in successfully
securing funding for improvements; 
5. the officer support offered by Zero Waste Scotland; and 
6. the detail provided in the report regarding the Circular Economy Bill. 
Page 17

Page 18

(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated November 2023, submitted) 
8. CEMETERY ASSET - ANNUAL REPORT 
The Committee gave consideration to a report providing an annual update on the current
Argyll and Bute “active” cemetery estate – number of lairs for sale and operational
timescales within the Cemetery Development programme. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
submitted report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated November 2023, submitted) 
9. PLAY PARK FUNDING - UPDATE REPORT NO 3 
The Scottish Government had allocated £938k for Play Park Funding to Argyll and Bute
Council for investment in play park equipment through to 2025/26.  The Committee gave
consideration to a report providing an update on the engagement process covering local
Elected Members, Community Councils, Education and disability forums. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. endorsed the Area Committee priorities for each play park in their area and the
allocation of funding as per paragraph 1.6 of the submitted report; 
2. noted the updates regarding the Tarbet Play park and the partnership approach to Port
Ellen play park in Islay; and 
3. noted the updated timelines. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated November 2023, submitted) 
10. OCTOBER 2023 WEATHER EVENT - UPDATE 
The Committee gave consideration to a report summarising the rain event that caused
significant travel disruption and damage during the weekend of 7 October 2023.  The
report also summarised the extent of works that had been carried out to repair the
damage and considered what the next steps should be in relation to investment to enable
climate change adaptations to be made. 
Decision 
The Environment, Development and Infrastructure noted the content of the submitted
report.
Page 18

Page 19

(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated November 2023, submitted) 
11. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORK PLAN 
The Environment, Development and Infrastructure Committee work plan was before the
Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
work plan. 
(Reference: Environment, Development and Infrastructure Committee work plan as at
November 2023, submitted) 
Page 19

Page 20

This page is intentionally left blank

Page 21

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER AND BY MICROSOFT TEAMS 
on THURSDAY, 7 DECEMBER 2023 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Fiona Howard
Councillor Willie Hume
Councillor Reeni Kennedy-Boyle 
Councillor Jim Lynch
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Dougie Philand
Councillor Alastair Redman 
Also Present: Councillor Maurice Corry 
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Anne Blue, Head of Financial Services
Fergus Murray, Head of Development and Economic Growth
Shona Barton, Governance Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest and Andrew Kain. 
2. DECLARATIONS OF INTEREST 
Councillor Dougie Philand declared a non-financial interest in item 8 of the agenda
(Conservation Area Regeneration Scheme (CARS) Projects: 2-4 and 6-10 Argyll Street,
Lochgilphead) due to him having relatives in the building industry and possible tenderers
for the works to be carried out in relation to this project.  He advised that he would leave
the room during the consideration of this item of business. 
3. MINUTES 
The Minutes of the meeting of the Policy and Resources Committee held on 12 October
2023 were approved as a correct record. 
* 4. FINANCIAL REPORTS MONITORING PACK - 31 OCTOBER 2023 
The Committee gave consideration to a report providing a summary of the financial
monitoring reports as at the end of October 2023. There were five detailed reports setting
out the position as at 31 October 2023 which included the Revenue Budget Monitoring
Report; Monitoring of Financial Risks; Capital Plan Monitoring Report; Treasury Monitoring
Report and Reserves and Balances. 
Decision 
The Policy and Resources Committee –
Page 21 Agenda Item 4b

Page 22

1. noted the revenue budget monitoring report as at 31 October 2023; 
2. noted the financial risks for 2023-24; 
3. noted the capital plan monitoring report as at 31 October 2023 and approved the
proposed changes to the capital plan outlined in Appendix 4 of that report; 
4. noted the treasury monitoring report as at 31 October 2023; 
5. noted the reserves and balances report as at 31 October 2023; and 
6. agreed to recommend to Council that the revenue virements over £0.200m during
September and October 2023 are approved. 
(Reference: Report by Section 95 Officer dated 3 November 2023, submitted) 
* 5. BUDGET OUTLOOK 2024-25 TO 2028-29 
The Committee gave consideration to a report providing an update to the budget outlook
covering the period 2024-25 to 2028-29, previously reported to the Policy and Resources
Committee on 12 October 2023. 
Decision 
The Policy and Resources Committee – 
1. noted the current estimated budget outlook position for the period 2024-25 to 2028-29; 
2. agreed to recommend to Council that the utilities budgets are right sized by utilising
£0.936m of the £1.4m contingency that was set aside for inflationary increases as part
of the 2023-24 budget setting process; 
3. agreed to recommend to Council that the shortfall in the teachers pay award funding is
met by utilising £0.080m of the £1.4m contingency that was set aside for inflationary
increases as part of the 2023-24 budget setting process; and 
4. noted that Argyll and Bute Council were selected as a Scottish Local Authority for a
Levelling Up Partnership (LUP) with the UK Government and will therefore receive up
to £20 million to address specific local challenges and opportunities. 
(Reference: Report by Section 95 Officer dated 7 November 2023, submitted) 
Councillor Amanda Hampsey left the meeting during the consideration of the following
item of Business. 
6. BUDGET UPDATE REPORT 
The Committee gave consideration to a report providing an update on the budget setting
process for 2024/25. 
Decision 
Page 22

Page 23

The Policy and Resources Committee – 
1. noted the budget update report; 
2. noted that the items outlined in the report would feature in the Budget Pack in
February 2024; and 
3. noted that options in relation to the funding of LEIP would be brought to a future
meeting of the Council. 
(Reference: Report by Section 95 Officer dated 10 November 2023, submitted) 
* 7. 2024/2025 ANNUAL REVIEW - PROCUREMENT STRATEGY 2022/25 AND
SUSTAINABLE PROCUREMENT POLICY 2022/25 
The Committee gave consideration to a report which sought approval of revisions to the
Procurement Strategy 2022/25 and Sustainable Procurement Policy 2022/25 following the
annual review of both documents. 
Decision 
The Policy and Resources Committee – 
1. noted the minor changes to the Procurement Strategy 2022/2025 and Sustainable
Procurement Policy 2022/2025; and 
2. approved the final revised Procurement Strategy 2022/25 and Sustainable
Procurement Policy 2022/25, to go on to the Full Council in February 2024. 
(Reference:  Report by Executive Director with responsibility for Legal and Regulatory
Support dated 7 November 2023, submitted) 
Councillor Dougie Philand, having declared an interest in the following item of Business,
left the meeting and took no part in the consideration of this item. 
8. CONSERVATION AREA REGENERATION SCHEME (CARS) PROJECTS - 2-4
AND 6-10 ARGYLL STREET, LOCHGILPHEAD 
The Committee gave consideration to a report outlining the funding gap that existed in the
final two priority buildings of the Lochgilphead Conservation Area Regeneration Scheme
(CARS).  The report requested the utilisation of an additional £137,271.46 grant funding
from the Private Sector Housing Grant (PSHG) budget to cover the funding gap and
facilitate these two key projects. 
Decision 
The Policy and Resources Committee approved the utilisation of Private Sector Housing
Grant (PSHG) to award an additional £137,271.46 grant to the 2-4 Argyll Street and 6-10
Argyll Street Lochgilphead CARS projects, thus providing essential gap funding to
facilitate the essential repair and conservation of these buildings. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated November 2023, submitted)
Page 23

Page 24

Councillor Dougie Philand re-joined the meeting at this point. 
9. NATURE RESTORATION FUND - SPEND OPTIONS 
The Committee gave consideration to a report recommending that the Council take
forward a number of deliverable projects utilising the Nature Restoration Fund allocated by
the Scottish Government. 
Decision 
The Policy and Resources Committee – 
1. noted the remaining allocation of Nature Restoration Funding; 
2. noted the suggestions received by Elected Members in Appendix 1 to the submitted
report; and 
3. agreed to the recommended projects as set out in Appendix 2 of the submitted report. 
(Reference:  Report by Executive Director with responsibility for Executive Director with
responsibility for Development and Economic Growth and Roads and Infrastructure
Services; and the Executive Director for Commercial Services dated December 2023,
submitted) 
10. SINGLE AUTHORITY MODEL UPDATE 
The Committee gave consideration to a report providing an update on the progress that
has been made in terms of exploring options for a Single Authority Model in Argyll and
Bute and the engagement that has taken place with the Scottish Government and other
key partners. 
Decision 
The Policy and Resources Committee – 
1. noted that the Scottish Government have formally advised the Council that Ministers
welcome their involvement in discussions on Single Authority Models; 
2. noted the ongoing engagement and collaboration with key partners to develop suitable
options, as set out at paragraphs 4.3 and 4.4 of the submitted report; and 
3. noted that a further report will be prepared for the Policy and Resources Committee
following the completion of work to articulate the benefits and key objectives
associated with each option. 
(Reference: Report by Chief Executive dated 16 November 2023, submitted) 
11. POLICY AND RESOURCES COMMITTEE WORKPLAN 
The Policy and Resources Committee Workplan was before the Committee for noting. 
Page 24

Page 25

Decision 
The Policy and Resources Committee noted the content of the Workplan as at December
2023. 
(Reference: Policy and Resources Committee Workplan dated December 2023,
submitted)
Page 25

Page 26

This page is intentionally left blank

Page 27

MINUTES of MEETING of COMMUNITY SERVICES COMMITTEE held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 14 DECEMBER 2023 
Present: Councillor Yvonne McNeilly (Chair) 
Councillor Gordon Blair
Councillor Math Campbell-
Sturgess
Councillor Garret Corner
Councillor Audrey Forrest
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie 
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Dougie McFadzean
Councillor Julie McKenzie
Councillor Gemma Penfold
Margaret Anderson
Lorna Stewart 
Attending: Douglas Hendry, Executive Director
Jennifer Crocket, Head of Education: Wellbeing, Inclusion and Achievement
Wendy Brownlie, Head of Education: Performance and Improvement
Ross McLaughlin, Head of Commercial Services
Stuart McLean, Committee Manager
Graeme McMillan, Transformation Programme Manager
Fiona Davies, Chief Officer, Argyll & Bute Health & Social Care Partnership
Kristin Gillies, Head of Head of Strategic Planning, Performance and
Technology, Argyll & Bute Health & Social Care Partnership
Alex Edmonstone, Commercial Operations Manager, Live Argyll
Chief Superintendent Lynn Ratcliff, Police Scotland
Inspector Lee Page, Police Scotland
Chief Inspector Alan Dickson, Police Scotland
Group Commander Gregg McKearney, Scottish Fire and Rescue Service 
The Chair ruled, and the Committee agreed, to vary the order of business and consider
Agenda Item 13 (ARGYLL & BUTE HEALTH & SOCIAL CARE PARTNERSHIP -
PERFORMANCE  REPORT - FQ1 2023/24) after Agenda Item 3 (MINUTE) in order to
facilitate the Officer attending another meeting. 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Andrew Kain, Iain Shonny Paterson
and Dougie Philand, and from Reverend Sandy MacPherson (Church Representative) and
Dan Semple (Teacher Representative). 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTE 
The Minute of the Community Services Committee held on 24 August 2023 was approved
as a correct record. 
Councillor Math Campbell-Sturgess joined the meeting at this point.
Page 27 Agenda Item 4c

Page 28

4. ARGYLL & BUTE HEALTH & SOCIAL CARE PARTNERSHIP - PERFORMANCE 
REPORT - FQ1 2023/24 
A report detailing performance for FQ1 (April – June) 2023/24 for Argyll & Bute Health &
Social Care Partnership was considered. 
Decision 
The Committee considered and noted the IJB HSCP – FQ1 Performance Report 2023/24
(April – June). 
(Reference: Report by Head of Strategic Planning, Performance and Technology, Argyll &
Bute HSCP dated 14 December 2023, submitted) 
Margaret Anderson (Church Representative) joined the meeting at this point. 
5. SCHOOLS CONSULTATION (SCOTLAND) ACT 2010 - KILCHRENAN PRIMARY
SCHOOL 
A report providing details of a draft proposal for Kilchrenan Primary School formulated in
accordance with the requirements of the Schools (Consultation) (Scotland) Act 2010, as
amended (the 2010 Act), was considered. 
Decision 
The Committee agreed to adopt the draft proposal, as set out in Appendix A, as a
“relevant proposal” that would now proceed to statutory consultation under the 2010 Act. 
(Reference: Report by Executive Director with responsibility for Education dated 4
December 2023, submitted) 
6. EDUCATION PERFORMANCE DATA ANALYSIS 2022-23 
A report providing an overview of key performance data and outcomes for all pupils across
Argyll and Bute’s ten secondary schools, including secondary attainment at Parklands
School in Helensburgh, for session 2022-2023, using local authority data on attainment,
as supplied by the Scottish Government’s Insight tool, was considered. 
Decision 
The Committee agreed to: 
1. consider the information contained in the report; 
2. commend the hard work and commitment of pupils and staff in securing these levels of
attainment and achievement, and recognise the crucial role in such success played by
parents and carers in partnership with our schools; 
3. note the SQA directive that as a consequence of the different assessment
arrangements in place each year over the period 2020-2023 as a result of Covid-19,
meaningful comparison between 2023 results and results in other years in this period,
specifically 2020 and 2021, was not possible; and
Page 28

Page 29

4. note that a further report would come to a future meeting of the Committee once final
Insight data for session 2022-2023 was made available in the February 2024 Insight
update. 
(Reference: Report by Executive Director with responsibility for Education dated 14
December 2023, submitted) 
7. ANNUAL PARTICIPATION MEASURE 2022-23 
A report providing Members with information on the most recent Annual Participation
Measure published in August 2023, covering the period April 2022 – March 2023, was
considered. 
Decision 
The Committee agreed to: 
1. note the publication of the 2022-2023 Annual Participation Measure; and 
2. recognise the strong and improving performance of Argyll and Bute as a Council area
in facilitating the participation of 16 – 19 year olds. 
(Reference: Report by Executive Director with responsibility for Education dated 14
December 2023, submitted) 
8. CARE EXPERIENCED CHILDREN AND YOUNG PEOPLE 
A report providing the Committee with an update on actions being taken within the
Education Service to support Care Experienced Children and Young People to achieve
the best possible educational outcomes was considered. 
The report also details the expenditure against the grant allocated by Scottish
Government to Argyll and Bute for session 2022/23 from the Scottish Attainment
Challenge Care Experienced Children and Young People Fund. 
Decision 
The Committee agreed: 
1. to continue to endorse the work undertaken by Argyll and Bute Education Services as
part of the Corporate Parenting Board to improve the educational attainment and life
chances of Care Experienced Children and Young People; 
2. to note that the spending plan for the grant allocated by Scottish Government to Argyll
and Bute for session 2022/23 from the Scottish Attainment Challenge Care
Experienced Children and Young People Fund had been produced and monitored by
the Education Lead for Care Experienced Children and Young People, in consultation
with key partners and specifically the Social Work Lead for Care Experience, the Chief
Education Officer and Chief Social Worker; 
Page 29

Page 30

3. the attainment funding for Care Experienced Children and Young People would
support the continued input from the Care Experienced Education Team (Virtual Head
Teacher and Health and Wellbeing Liaison Officers); and 
4. that the Chief Education Officer would continue to provide updates on the improved
outcomes for Care Experienced Children and Young People to the Corporate
Parenting Board/Community Services Committee. 
(Reference: Report by Executive Director with responsibility for Education dated 14
December 2023, submitted) 
9. COUNSELLING IN SCHOOLS 
A paper providing an update on the delivery and impact of the Counselling in Schools
service from January – September 2023 when the service has been provided by The
Therapeutic Counselling Service (The Exchange) was considered. 
Decision 
The Committee agreed: 
1. to note the change in provision of the Counselling in Schools Service to The
Therapeutic Counselling Service (The Exchange), the positive impact it has had on
children and young people’s wellbeing since its inception in January 2023, and support
the ongoing commitment to deliver this service within all schools; 
2. the continued need for support across the Health and Social Care Partnership and the
Education Service to further embed this service within current processes, ensure a
clear continuum of support and improve access for children and young people; 
3. to note that a successful approach required joint working between Education
establishments and the Counselling in Schools Service as partners in co-facilitation
including the use of school spaces for young people to access their counselling
sessions; and 
4. the need to consider how best to ensure impact from the Counselling in Schools
funding which had now been base lined in to the Council’s financial settlement. 
(Reference: Report by Executive Director with responsibility for Education dated 14
December 2023, submitted) 
10. FEASIBILITY STUDY - CAMPBELTOWN EDUCATION ESTATE 
At the Community Services Committee on 9 March 2023, it was agreed to request the
Executive Director with responsibility for Education to prepare an initial report outlining the
way forward and potential for a proposal in terms of the Schools (Consultation) (Scotland)
Act 2010 which would allow for an initial business case to be formulated with a view to
replacing the existing outdated Campbeltown primary schools of Dalintober and Castlehill,
and that the completed report be presented to a meeting of the Community Services
Committee. 
An update report outlining the steps taken to fulfil this request was considered. 
Page 30

Page 31

Decision 
The Committee agreed: 
1. to note the Campbeltown feasibility study that had been undertaken and acknowledge
that this could be retained for review at a later date should funding become available;
and 
2. that at this time, the Council’s Learning Estate Strategy has determined that Mull was
the number one priority and therefore must take precedence for any funding. 
(Reference: Report by Executive Director with responsibility for Commercial Services and
Education dated 14 December 2023, submitted) 
11. LIVE ARGYLL - MONITORING AND PERFORMANCE REPORT 
A report providing the Community Services Committee with an update on the performance
and monitoring arrangements between Live Argyll (LA) and the Council as set out in the
various agreements between the Council and the Trust, was considered. 
Decision 
The Committee agreed to consider and note the contents of this report together with the
Live Argyll Annual Report 2022/23 attached at Appendix 1. 
(Reference: Report by Executive Director with responsibility for Commercial Services
dated 23 November 2023 and Live Argyll Annual Report 2022/23, submitted) 
12. POLICE SCOTLAND - ARGYLL & BUTE PERFORMANCE SUMMARY REPORT
- REPORTING PERIOD: Q2 APRIL - SEPTEMBER 2023 
Chief Superintendent Lynn Ratcliff presented the Argyll & Bute Performance Summary
Report of Police Scotland’s Policing Priorities for 2023-2026 for the reporting period July -
September 2023 and responded to questions asked. 
Decision 
The Committee reviewed and noted the contents of the report. 
(Reference: Report for Quarter 2 2023/24 by Divisional Commander for Argyll and Bute
West Dunbartonshire Division, Police Scotland, submitted) 
13. SCOTTISH FIRE AND RESCUE SERVICE - ARGYLL & BUTE PERFORMANCE
REPORT Q2 - 1 JULY - 30 SEPTEMBER 2023 
With the aid of power point slides, Commander Gregg McKearney presented a report
highlighting Scottish fire and Rescue Service’s review of local performance within Argyll
and Bute for Q2 2023-2024 and responded to a number of questions asked. 
Decision 
The Committee reviewed and noted the contents of the report. 
Page 31

Page 32

(Reference: Q2 2023-2024 Report by Local Senior Officer, Scottish Fire and Rescue
Service, submitted) 
14. EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
A report providing details of all external establishment inspection reports received across
Argyll and Bute Education Service during the period May to October 2023 was before the
Committee for information. 
Decision 
The Committee noted:- 
1. the contents of this report; 
2. this quarterly report would be presented on an ongoing basis to the Community
Services Committee detailing all establishment inspections conducted and published
by Education Scotland within that period; and 
3. that Ward Members would receive copies of school inspection reports for schools
within their area as published by Education Scotland. 
(Reference: Report by Executive Director with responsibility for Education dated October
2023, submitted) 
15. COMMUNITY SERVICES COMMITTEE WORK PLAN 2023/2024 
The Community Services Committee work plan for 2023-2024 was before the Committee
for information. 
Decision 
The Committee noted the contents of the work plan. 
(Reference: Community Services Committee Work Plan 2023-2024, submitted)
Page 32

Page 33

MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held ON A HYBRID BASIS IN
THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 15 FEBRUARY 2024 
Present: Councillor Robin Currie (Chair) 
Councillor Gordon Blair
Councillor Audrey Forrest
Councillor Kieron Green
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Reeni Kennedy-Boyle 
Councillor Liz McCabe
Councillor Yvonne McNeilly
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Alastair Redman 
Also Present: Councillor Jan Brown
Councillor Graham Archibald Hardie
Councillor Jennifer Kelly 
Councillor Paul Kennedy
Councillor Tommy MacPherson
Councillor Peter Wallace
Attending: Pippa Milne, Chief Executive
Douglas Hendry, Executive Director
Kirsty Flanagan, Executive Director
Anne Blue, Head of Financial Services
Fergus Murray, Head of Development and Economic Growth
Ross McLaughlin, Head of Commercial Services
Jane Fowler, Head of Customer and Support Services
Shona Barton, Governance Manager
Carolyn Cairns, HR and OD Manager
Matt Mulderrig, Development Policy and Housing Manager
Lorna Byrne, Revenue and Benefits Assistant 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Amanda Hampsey, Willie Hume,
Jim Lynch and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
Councillor Ross Moreland advised in relation to item 8 of the agenda (Strategic Events
and Festivals Fund - Round 6 2024/2025) that he had been appointed to the group
“Dunoon Presents” by the Council who had involvement in the funding request for “Doon
the Water Revival Music Festival”.  Having taken note of the updated Standards
Commission Guidance in relation to declarations (issued on 7 December 2021) with
specific reference to section 5.4(c) he did not consider that he had a relevant connection
and as such would remain in the meeting. 
3. MINUTES 
The Minutes of the meeting of the Policy and Resources Committee held on 7 December
2023 were approved as a correct record. 
Page 33 Agenda Item 4d

Page 34

Councillor Gordon Blair joined the meeting during the consideration of the following item of
business. 
* 4. FINANCIAL REPORTS MONITORING PACK - 31 DECEMBER 2023 
The Committee gave consideration to a report providing a summary of the financial
monitoring reports as at the end of December 2023. There were five detailed reports
setting out the position as at 31 December 2023 which included the Revenue Budget
Monitoring Report; Monitoring of Financial Risks; Capital Plan Monitoring Report, Treasury
Monitoring Report and Reserves and Balances. 
Decision 
The Policy and Resources Committee – 
1. noted the revenue budget monitoring report as at 31 December 2023; 
2. noted the financial risks for 2023-24; 
3. noted the capital plan monitoring report as at 31 December 2023 and approved the
proposed changes to the capital plan outlined in Appendix 4 of that report; 
4. noted the treasury monitoring report as at 31 December 2023; 
5. noted the reserves and balances report as at 31 December 2023; and 
6. agreed to recommend to Council that the revenue virements over £0.200m during
November and December 2023 were approved. 
(Reference: Report by Section 95 Officer dated 12 January 2024, submitted) 
* 5. BUDGETING PACK 2024-2025 
The Committee gave consideration to the full package of papers included in the budgeting
packs in relation to the revenue and capital budgets for 2024-2025. 
Decision 
The Policy and Resources Committee agreed to refer consideration of the Budgeting Pack
2024-2025 to the Council meeting on 22 February 2024, without recommendation. 
(Reference: Budgeting Pack 2024-2025 dated 15 February 2024, submitted) 
* 6. TREASURY MANAGEMENT STRATEGY AND ANNUAL INVESTMENT
STRATEGY 
The Committee gave consideration to a report presenting the draft Treasury Management
Strategy and Annual Investment Strategy for approval.  The report also set out the policy
for the repayment of loans fund advances for 2024-25. 
Decision 
The Policy and Resources Committee agreed to refer to Council to - 
Page 34

Page 35

1. approve the proposed Treasury Management Strategy Statement and Annual
Investment Strategy and the indicators contained within. Note that the figures within
the Strategy will be updated to reflect the budget decisions agreed at Council; 
2. approve the continued use of the asset life method for the repayment of loan fund
advances using a 5.1% annuity interest rate, with the exception of spend to save
schemes where the funding/income profile method could be used; 
3. approve the proposed asset repayment periods as detailed within section 2.7 of the
Treasury Management Strategy Statement; and 
4. approve the ability to continue to use countries with a sovereign rating of AA- and
above, as recommended by the Council’s external treasury management advisors. 
(Reference: Report by Section 95 Officer dated 24 January 2024, submitted) 
* 7. SCOTTISH WELFARE FUND - FINANCIAL POSITION 
The Committee gave consideration to a report advising of the financial challenges faced
by local authorities in managing the Scottish Welfare Fund, with rising costs and demand
for support. 
Decision 
The Policy and Resources Committee – 
1. agreed the continuation of Financial Services' commitment to uphold the existing High
Priority status for Scottish Welfare Fund applications throughout the 2024/2025 period; 
2. agreed to refer the consideration of a cost pressure amounting to £250,000 to the
Council as part of the budget setting process to address the anticipated overspend; 
3. noted that officers were not recommending a move to High Most Compelling (HMC)
priority level due to the impact this will have on housing; and 
4. agreed to making representations to lobby the Scottish Government for more funding
to support the fund in future years or alternatively to amend the guidance to restrict
spend in future. 
(Reference: Report by Head of Financial Services dated 15 February 2024, submitted) 
The Chair ruled and the Committee agreed to adjourn for a comfort break from 12.00pm to
12.10pm. 
* 8. STRATEGIC EVENTS AND FESTIVALS FUND - ROUND 6 2024/2025 
The Committee gave consideration to a report providing an update on Round 6 of the
Council’s Strategic Events and Festivals Fund (SEF) for 2024/25.  The report provided
details of the applications submitted and recommendations regarding all applications put
forward to receive grant funding. The report also sought agreement to allocate funding of
£90,000 to allow a future round (Round 7) for 2025/26. 
Page 35

Page 36

Decision 
The Policy and Resources Committee – 
1. agreed to the award of eligible SEF Round 6 grants amounting to £114,700 as detailed in
Table 1 of the submitted report; 
2. agreed that any SEF Round 6 grant offer only be formally issued upon confirmation from
the individual event organisation that the event is formally confirmed as going ahead, any
match funding is in place and the event still meets the SEF Round 6 criteria; 
3. agreed to continue delegation of powers to the Executive Director with responsibility
for Development and Economic Growth to allow any subsequent amendment to
existing grant requests to be made brought about as a consequence of changes to the
event/event budget. Any amendment to a current grant request/offer would only be
considered if the amendment related to either the same level or a reduction in the
request and constitute up to 75% of legitimate and eligible expenditure.  Similarly if
there was a reduction in the final event costs that would result in delivery of a profit in
excess of £10,000 (all of which has to be reinvested) to the organisation and that this was
sustained over a 3 year period the final retention (10%) would not be paid on the third
year of the grant; 
4. agreed to recommend to the Council that as part of the budget in February 2024, that
they agree £90,000 base funding for Strategic Events and Festivals in order that the
application process can commence during 2025/26 (Round 7), and that this fund be
augmented by any underspend in Round 5 (23/24); 
5. agreed to recommend to Council that any underspend from SEF Round 6 is
earmarked and used to augment a future SEF round. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 22 December 2023, submitted) 
9. CROWN ESTATE 2023/24 ALLOCATION - UPDATE 
The Committee gave consideration to a report advising of the remaining £590,409 of the
Council’s £1,590,409 allocation of Crown Estate Funding for 2023/24 still to be allocated.
The report proposed that £130,662 was allocated from the £590,409 to top up the full
Bellwin threshold amount of £528,662, which would leave £459,747 still to be allocated. 
Decision 
The Policy and Resources Committee – 
1. noted the formal allocation of the £1million of Crown Estate funding for 2023/24 as
approved under delegated powers and as detailed in Table 1 of the submitted report; 
2. agreed to allocate a further £130,662 to make up the Bellwin threshold amount of
£528,662; 
3. agreed to allocate the remaining £459,747 as detailed in the submitted report at
paragraph 4.7 and Table 2; and 
Page 36

Page 37

4. agreed to a delegation of powers to the Executive Director with responsibility for
Development and Economic Growth to allow any subsequent amendment to approved
Crown Estate grant allocations to ensure that any risk relating to having to payback
any grant is minimised, noting that this could involve swapping Crown Estate
allocations with Place Based Investment Programme (PBIP) allocations of grants
against individual projects, but would not affect the projects identified but simply the
grant source. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 11 January 2024, submitted) 
10. OBAN AND HELENSBURGH STRATEGIC DEVELOPMENT FRAMEWORKS 
The Committee gave consideration to a report outlining in brief some of the work that
would be involved in producing Strategic Development Frameworks for Oban and
Helensburgh, and why resources were required to drive forward these tasks at pace. 
Decision 
The Policy and Resources Committee noted the content of the submitted report and
agreed to the resource request of £450,000 from the Council’s Priorities Budget to assist
in driving forward the Strategic Development Frameworks. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 17 January 2024, submitted) 
11. ARGYLL AND BUTE - MOBILE COVERAGE MAPPING 
The Committee gave consideration to a report which sought approval to utilise £25k from
the Digital Exclusion Fund to enter a partnership project with Scottish Futures Trust. 
Decision 
The Policy and Resources Committee approved the provision of £25k funding from the
Digital Exclusion Fund to enable the Council to match fund an equal contribution from our
partner, Scottish Futures Trust, to undertake a Mobile Phone Coverage Map exercise
covering Argyll and Bute. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 January 2024, submitted) 
12. PEOPLE STRATEGY AND STRATEGIC WORKFORCE PLANNING PRIORITIES
2024 - 2028 
The Committee gave consideration to a report presenting the People Strategy and
Strategic Workforce Planning Priorities for 2024 – 2028.  The documents had been
developed in consultation with management teams and reflected the principles of Connect
for Success. 
Decision 
The Policy and Resources Committee – 
Page 37

Page 38

1. approved the People Strategy 2024-2028; and 
2. noted the Strategic Workforce Planning Priorities for the period 2024-2028. 
(Reference: Report by Executive Director with responsibility for Customer and Support
Services dated 9 January 2024, submitted) 
13. CLIMATE CHANGE BOARD UPDATE AND DECARBONISATION TRACKER 
The Committee gave consideration to a report outlining overarching activities of the
Climate Change Board to the Council and providing an update of key contributors to the
Council’s climate actions. 
Decision 
The Policy and Resources Committee noted the updates contained at Section 5 of the
submitted report; and the full Decarbonisation Tracker update contained at Appendix A to
the submitted report. 
(Reference: Report by Executive Director with responsibility for Commercial Services
dated 15 January 2024, submitted) 
14. ARGYLL AND BUTE HOUSING EMERGENCY - PROJECT OFFICER
RESOURCE 
The Committee gave consideration to a recommendation from the meeting of the
Environment, Development and Infrastructure Committee held on 30 November 2023 in
respect of a proposal for the recruitment of a Project Officer to assist in the acceleration of
the work to address the Housing Emergency in Argyll and Bute. 
Decision 
The Policy and Resources Committee agreed – 
1. the recommendation from the Environment, Development and Infrastructure
Committee that the Council recruit a Project Officer to assist in accelerating the work to
address the Housing Emergency, with funding for the post being drawn from the
Council’s Priorities Investment Fund; and 
2. that the Project Officer post would be recruited on a fixed term contract for a period of
3 years. 
(Reference: Recommendation from Environment, Development and Infrastructure
Committee held on 30 November 2023; and report by Executive Director with
responsibility for Development and Economic Growth dated October 2023, submitted) 
15. POLICY AND RESOURCES COMMITTEE WORKPLAN 
The Policy and Resources Committee workplan was before the Committee for noting. 
Decision 
The Policy and Resources Committee noted the content of the work plan.
Page 38

Page 39

(Reference: Policy and Resources Committee workplan dated February 2024, submitted) 
Page 39

Page 40

This page is intentionally left blank

Page 41

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 22 FEBRUARY 2024
TREASURY MANAGEMENT STRATEGY STATEMENT AND ANNUAL INVESTMENT
STRATEGY 
1.  EXECUTIVE SUMMARY 
1.1 The Council has adopted the Chartered Institute of Public Finance and
Accountancy (CIPFA) Code of Practice on Treasury Management in Local
Authorities.  A requirement of the Code is for an annual Treasury Management
Strategy Statement and Investment Strategy to be approved by Council for the
forthcoming financial year. This report seeks Member’s approval of the proposed
Treasury Management Strategy Statement and Annual Investment Strategy. 
The report also sets out the policy for the repayment of loans fund advances for
2024-25.   
1.2 The draft Treasury Management Strategy Statement and Annual Investment
Strategy will be presented to the: 
• Policy and Resources Committee on 15 February 2024
• Council on 22 February 2024
• Audit and Scrutiny Committee on 14 March 2024
• If required, Council on 25 April 2024, following recommendations from the
Audit and Scrutiny Committee that need approval from Council. 
1.3 The Council uses Link Group as its external treasury management advisors. 
The Council recognises that there is value in employing external providers of
treasury management services in order to acquire access to specialist skills and
resources. The Council will ensure that the terms of their appointment and the
methods by which their value will be assessed are properly agreed and
documented, and subject to regular review. 
1.4 Section 2 of the attached document outlines the Council’s Capital Prudential and
Treasury Indicators which Members are asked to approve. 
1.5 In 2016 new regulations were enacted by the Scottish Parliament, the Local
Authority (Capital Finance and Accounting) (Scotland) Regulations 2016, under
which the Council is required to set out its policy for the statutory repayment of
loans fund advances prior to the start of the financial year as detailed in section
2.6 of the strategy. The policy on repayment of loans fund advances in respect of
capital expenditure by the Council is to ensure that the Council makes a prudent
provision each year to pay off an element of the accumulated loans fund
advances made in previous financial years.     
1.6  A review of the Council’s loan fund advance repayments was undertaken in
2019-20 with advice from our external treasury management advisors. The
review was undertaken to ensure the Council continues to make a prudent
provision each year for the repayment of loans fund advances. 
Page 41 Agenda Item 6

Page 42

1.7 
1.8
The review considered new loans fund advances and historic loans fund
advances to assess whether the repayment methodology was still the most
prudent option.  In doing so a revised policy on loans fund advance repayment
profiling was introduced as follows: 
For all new loans fund advances the policy for repayment is: 
o Asset life method – loans fund advances will be repaid with reference
to the life of an asset using a 5.1% annuity rate; 
o Funding / Income profile method – loans fund advances will be
repaid by reference to an associated income stream using a 5.1%
annuity rate. This would be utilised where the asset will generate
income which can be used to repay the debt or as a result of spend to
save schemes where again the savings can be used to repay the
loans fund advances. 
During 2023-24 a decision was taken to repay three of our loans early to take
advantage of a discount which was on offer. This has provided the Council with a
one-off gain of £0.294m which will be transferred to the General Fund and can
assist with budget pressures. 
1.9  Section 3 of the document outlines the current actual external debt against the
capital financing requirement highlighting any over or under borrowing. There is
information on the interest rates projections and the borrowing strategy.   
1.10 Section 4 of the document outlines the annual investment strategy.  The
Council’s investment priorities will be security first, liquidity second and then
return. It explains the creditworthiness policy and the use of Link Treasury
Services in this respect as well as the Country and Sector limits. 
1.11  There are a number of appendices in Section 5.  Some of this information has
been provided by the Council’s external treasury management advisors.   
2. RECOMMENDATIONS 
2.1 It is recommended that the Council: 
a) Approve the proposed Treasury Management Strategy Statement and
Annual Investment Strategy and the indicators contained within. Note that
the figures within the Strategy will be updated to reflect the budget
decisions agreed at Council. 
b) Approve the continued use of the asset life method for the repayment of
loan fund advances using a 5.1% annuity interest rate, with the exception
of spend to save schemes where the funding/income profile method could
be used. 
c) Approve the proposed asset repayment periods as detailed within section
2.7 of the Treasury Management Strategy Statement. 
d) Approve the ability to continue to use countries with a sovereign rating of
AA- and above, as recommended by the Council’s external treasury
management advisors.  
Page 42

Page 43

3. IMPLICATIONS
3.1 Policy – Sets the policy for borrowing and investment decisions.
3.2 Financial – An effective Treasury Management Strategy forms a significant part
of the Council’s financial arrangements and its financial well-being.
3.3 Legal - None.
3.4 HR - None.
3.5
3.5.1
3.5.2
3.5.3
Fairer Scotland Duty – None.
Equalities – None.
Socio-Economic Duty – None.
Islands Duty – None.
3.6 Climate Change – None.
3.7 Risk - This report does not require any specific risk issues to be addressed,
however members will be aware that the management of risk is an integral part
of the Council’s treasury management activities.
3.8 Customer Service - None.
3.9 The Rights of the Child (UNCRC) – None.
Kirsty Flanagan
Executive Director/Section 95 Officer
6 February 2024
Policy Lead for Finance and Commercial Services: Councillor Gary
Mulvaney
APPENDICES
Appendix 1 – Treasury Management Strategy Statement and Annual
Investment Strategy 2024-25
For further information please contact: Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk
Page 43

Page 44

1 
Treasury Management Strategy Statement
and Annual Investment Strategy 2024-2025 
Page 44

Page 45

2 
1 INDEX 
1 INTRODUCTION ............................................................................................................................ 3
1.1 Background ......................................................................................................................................................... 6
1.2 Treasury Management Reporting ...................................................................................................................... 6
1.3 Treasury Management Strategy for 2024/25 ..................................................................................................... 7
1.4 Training  ............................................................................................................................................................. 8
1.5 Treasury management consultants ................................................................................................................... 8
2 CAPITAL PRUDENTIAL AND TREASURY INDICATORS 2024/25 – 2026/27 ..................... 10
2.1 Capital Expenditure and Financing .................................................................................................................. 10
2.2 The Council’s Overall Borrowing Need (the Capital Financing Requirement) ............................................... 11
2.3 Liability Benchmark ........................................................................................................................................... 11
2.4 Core funds and expected investment balances .............................................................................................. 11
2.5 Limits to Borrowing Activity ............................................................................................................................... 12
2.6  Statutory repayment of loans fund advances ................................................................................................. 14
2.7  Asset Repayment Periods ............................................................................................................................... 14
3 TREASURY MANAGEMENT STRATEGY ............................................................................... 15
3.1 Current portfolio position ................................................................................................................................... 15
3.2 Prospects for interest rates ............................................................................................................................... 17
3.3 Investment and borrowing rates ....................................................................................................................... 19
3.4 Borrowing strategy ............................................................................................................................................ 19
3.5 Policy on borrowing in advance of need ..........................................................................................……….    19
3.6 Debt rescheduling ............................................................................................................................................. 20
3.7 New financial institutions as a source of borrowing and/or types of borrowing .............................................. 20
3.8 Approved sources of long and short term borrowing ...................................................................................... 20
4 ANNUAL INVESTMENT STRATEGY ........................................................................................ 21
4.1 Investment policy .............................................................................................................................................. 21
4.2 Creditworthiness policy ..................................................................................................................................... 22
4.3 Country and sector limits .................................................................................................................................. 22
4.4 Investment Strategy ………………………………………………………………………………………………22
4.5 Investment risk benchmarking ......................................................................................................................... 24
4.6 End of year Investment Report ........................................................................................................................ 24
4.7 Policy on environmental, social and governance (E.S.G.) .............................................................................. 24
5 APPENDICES .............................................................................................................................. 25
Appendix 1 – Capital Prudential and Treasury Indicators 2024/25 – 2026/27 ..................................................... 25
Appendix 2 – Detailed Current Portfolio Position ................................................................................................... 27
Appendix 3 – Economic Background Provided by Link Group, Link Treasury Services (at 07.11.23) ............... 29
Appendix 4 - Treasury Management Practice (TMP1) Permitted Investments .................................................... 33
Appendix 5 – Treasury Management Practice (TMP2) Credit and Counterparty Risk Management ................. 42
Appendix 6 – Creditworthiness policy .................................................................................................................... 48
Appendix 7 – Approved Countries for Investments (at 30.11.23) ......................................................................... 50
Appendix 8 – Treasury Management Scheme of Delegation ............................................................................... 51
Appendix 9 – The Treasury Management Role of the Section 95 Officer ............................................................ 52
Appendix 10 - Policy on environmental, social and governance (E.S.G)  ............................................................ 54 
Page 45

Page 46

3 
1 INTRODUCTION (Key Considerations)
2021 revised CIPFA Treasury Management Code and Prudential Code – changes which
will impact on future TMSS/AIS reports and the risk management framework
CIPFA published the revised Codes on 20th December 2021 and revisions have been included in the
reporting framework from the 2023/24 financial year. This Authority, therefore, has to have regard to these
Codes of Practice when it prepares the Treasury Management Strategy Statement and Annual
Investment Strategy, and also related reports during the financial year, which are taken to Full Council for
approval. 
The revised Treasury Management Code requires all investments and investment income to be
attributed to one of the following three purposes: - 
Treasury management
Arising from the organisation’s cash flows or treasury risk management activity, this type of
investment represents balances, which are only held until the cash is required for
use.  Treasury investments may also arise from other treasury risk management activity,
which seeks to prudently manage the risks, costs or income relating to existing or forecast
debt or treasury investments. 
Service delivery
Investments held primarily and directly for the delivery of public services including housing,
regeneration and local infrastructure.  Returns on this category of investment, which are
funded by borrowing are permitted only in cases where the income is “either related to the
financial viability of the project in question or otherwise incidental to the primary purpose”. 
Commercial return
Investments held primarily for financial return with no treasury management or direct service
provision purpose.  Risks on such investments should be proportionate to an authority’s
financial capacity – i.e., that ‘plausible losses’ could be absorbed in budgets or reserves
without unmanageable detriment to local services. An authority must not borrow to invest
primarily for financial return. 
The revised Treasury Management Code will require an authority to implement the following: - 
1. Adopt a new liability benchmark treasury indicator to support the financing risk
management of the capital financing requirement; this is to be shown in chart form for a
minimum of ten years, with material differences between the liability benchmark and actual
loans to be explained; 
2. Long-term treasury investments, (including pooled funds), are to be classed as
commercial investments unless justified by a cash flow business case; 
3. Pooled funds are to be included in the indicator for principal sums maturing in years beyond
the initial budget year; 
4. Amendment to the knowledge and skills register for officers and members involved in the
treasury management function - to be proportionate to the size and complexity of the
treasury management conducted by each authority; 
5. Reporting to members is to be done quarterly.  Specifically, the Chief Finance Officer
(CFO) is required to establish procedures to monitor and report performance against all
forward-looking prudential indicators at least quarterly. The CFO is expected to establish a
measurement and reporting process that highlights significant actual or forecast deviations
Page 46

Page 47

4 
from the approved indicators.  However, monitoring of prudential indicators, including
forecast debt and investments, is not required to be taken to Full Council and should be
reported as part of the Authority’s integrated revenue, capital and balance sheet monitoring; 
6. Environmental, social and governance (ESG) issues to be addressed within an authority’s
treasury management policies and practices (TMP1). 
The main requirements of the Prudential Code relating to service and commercial investments
are: - 
1. The risks associated with service and commercial investments should be
proportionate to their financial capacity – i.e. that plausible losses could be absorbed
in budgets or reserves without unmanageable detriment to local services; 
2. An authority must not borrow to invest for the primary purpose of commercial return; 
3. It is not prudent for local authorities to make any investment or spending decision that
will increase the CFR, and so may lead to new borrowing, unless directly and primarily
related to the functions of the authority, and where any commercial returns are either
related to the financial viability of the project in question or otherwise incidental to the
primary purpose; 
4. An annual review should be conducted to evaluate whether commercial investments
should be sold to release funds to finance new capital expenditure or refinance
maturing debt; 
5. A prudential indicator is required for the net income from commercial and service
investments as a proportion of the net revenue stream; 
6. Create new Investment Management Practices to manage risks associated with non-
treasury investments, (similar to the current Treasury Management Practices). 
An authority’s Annual Investment Strategy should include: - 
1. The authority’s approach to investments for service or commercial purposes (together
referred to as non-treasury investments), including defining the authority’s objectives,
risk appetite and risk management in respect of these investments, and processes
ensuring effective due diligence; 
2. An assessment of affordability, prudence and proportionality in respect of the
authority’s overall financial capacity (i.e. whether plausible losses could be absorbed
in budgets or reserves without unmanageable detriment to local services); 
3. Details of financial and other risks of undertaking investments for service or
commercial purposes and how these are managed; 
4. Limits on total investments for service purposes and for commercial purposes
respectively (consistent with any limits required by other statutory guidance on
investments); 
5. Requirements for independent and expert advice and scrutiny arrangements (while
business cases may provide some of this material, the information contained in them
will need to be periodically re-evaluated to inform the authority’s overall strategy); 
Page 47

Page 48

5 
6. State compliance with paragraph 51 of the Prudential Code in relation to investments
for commercial purposes, in particular the requirement that an authority must not
borrow to invest primarily for financial return; 
As this Treasury Management Strategy Statement and Annual Investment Strategy deals solely
with treasury management investments, the categories of service delivery and commercial
investments should be addressed as part of the Capital Strategy report. 
However, as investments in commercial property have implications for cash balances managed by
the treasury team, it will be for each authority to determine whether to add a high level summary of
the impact that commercial investments have, or may have, if it is planned to liquidate such
investments within the three year time horizon of this report, (or a longer time horizon if that is felt
appropriate).  
Page 48

Page 49

6 
1.1 Background
The Council is required to operate a balanced budget, which broadly means that cash raised during the year
will meet cash expenditure.  Part of the treasury management operation is to ensure that this cash flow is
adequately planned, with cash being available when it is needed.  Surplus monies are invested in low risk
counterparties or instruments commensurate with the Council’s low risk appetite, providing adequate liquidity
initially before considering investment return. 
The second main function of the treasury management service is the funding of the Council’s capital plans. 
These capital plans provide a guide to the borrowing need of the Council, essentially the longer term cash flow
planning to ensure that the Council can meet its capital spending obligations.  This management of longer term
cash may involve arranging long or short term loans, or using longer term cash flow surpluses.   On occasion,
when it is prudent and economic, any debt previously drawn may be restructured to meet Council risk or cost
objectives.  
The contribution the treasury management function makes to the authority is critical, as the balance of debt and
investment operations ensure liquidity or the ability to meet spending commitments as they fall due, either on
day-to-day revenue or for larger capital projects.  The treasury operations will see a balance of the interest costs
of debt and the investment income arising from cash deposits affecting the available budget.  Since cash
balances generally result from reserves and balances, it is paramount to ensure adequate security of the sums
invested, as a loss of principal will in effect result in a loss to the General Fund Balance. 
CIPFA defines treasury management as: 
“The management of the local authority’s borrowing, investments and cash flows, its banking, money market
and capital market transactions; the effective control of the risks associated with those activities; and the pursuit
of optimum performance consistent with those risks.” 
Whilst any commercial initiatives or loans to third parties will impact on the treasury function, these activities are
generally classed as non-treasury activities, (arising usually from capital expenditure), and are separate from
the day-to-day treasury management activities.
1.2 Treasury Management reporting
The Council is required to receive and approve, as a minimum, three main reports each year, which
incorporate a variety of policies, estimates and actuals. 
An Annual Treasury Management Strategy Statement (this report) – this is the first and most important
report which is submitted to full Council before the start of the financial year.  The Council approve this
Strategy in February, after which the Audit and Scrutiny Committee have an opportunity to make
comments and recommendations. If required the Strategy would then go back to Council in April to
approve any amendments recommended by the Audit and Scrutiny Committee.  The Strategy  covers:
• The capital plans (including prudential indicators);
• A policy for the statutory repayment of debt, (how residual capital expenditure is charged to
revenue over time);
• The Treasury Management Strategy (how the investments and borrowings are to be organised)
including treasury indicators; and 
• An Annual Investment strategy (the parameters on how investments are be to managed).   
A mid-year Treasury Management Review Report - this will update Members with the progress on the
capital position, amending prudential indicators as necesssary and whether any policies require revision.  
Monitoring reports are submitted to each Policy and Resources Committee. 
Page 49

Page 50

7 
An Annual Treasury Report – this provides details of a selection of actual prudential and treasury
indicators and actual treasury operations compared to the estimates within the strategy.  This report is
presented to Council after the end of each financial year. 
Capital Strategy
The CIPFA 2021 Prudential and Treasury Management Codes require all local authorities to prepare a
capital strategy report, which will provide the following: 
• a high-level overview of how capital expenditure, capital financing and treasury management activity
contribute to the provision of services
• an overview of how the associated risk is managed
• the implications for future financial sustainability. 
The aim of this capital strategy is to ensure that all elected members on the full council fully understand the
overall long-term policy objectives and resulting capital strategy requirements, governance procedures and risk
appetite.  Recently the capital strategy was updated and a new Capital Investment Strategy was approved by
Policy and Resources Committee in August 2023. 
Scrutiny
The above reports are required to be adequately scrutinised before being recommended to Full Council.
This role is undertaken by the Policy and Resources Committee. 
Quarterly reports – In addition to the three major reports detailed above, from 2023-24 quarterly reporting
(end of June/ end of December) is also required. However, these additional reports do not have to be
reported to Full Council/Board but do require to be adequately scrutinised.  This role is undertaken by the
Policy and Resources Committee.  (The reports, specifically, should comprise updated Treasury/Prudential
Indicators.) 
1.3 Treasury Management Strategy for 2024/25
The strategy for 2024/25 covers two main areas: 
Capital issues
• the capital expenditure plans and the associated prudential indicators.
• the policy for statutory repayment of loans fund advances 
Treasury management issues
• the current treasury position;
• treasury indicators which limit the treasury risk and activities of the Council;
• prospects for interest rates;
• the borrowing strategy;
• policy on borrowing in advance of need;
• debt rescheduling;
• the investment strategy;
• creditworthiness policy; and
• policy on use of external service providers. 
These elements cover the requirements of the Local Government in Scotland Act 2003, the CIPFA
Prudential Code, the CIPFA Treasury Management Code and Scottish Government loans fund
Page 50

Page 51

8 
repayment regulations and investment regulations, particularly Finance Circulars 5/2010 and
7/2016. 
1.4 Training
The CIPFA Code requires the responsible officer to ensure that Members with responsibility for treasury
management receive adequate training in treasury management.  This especially applies to Members
responsible for scrutiny (Audit and Scutiny Committee).
Furthermore, pages 47 and 48 of the Code state that they expect “all organisations to have a formal and
comprehensive knowledge and skills or training policy for the effective acquisition and retention of treasury
management knowledge and skills for those responsible for management, delivery, governance and decision
making.
The scale and nature of this will depend on the size and complexity of the organisation’s treasury management
needs.  Organisations should consider how to assess whether treasury management staff and board/ council
members have the required knowledge and skills to undertake their roles and whether they have been able to
maintain those skills and keep them up to date. 
As a minimum, authorities should carry out the following to monitor and review knowledge and skills: 
• Record attendance at training and ensure action is taken where poor attendance is
identified. 
• Prepare tailored learning plans for treasury management officers and board/council
members. 
• Require treasury management officers and board/council members to undertake self-
assessment against the required competencies (as set out in the schedule that may
be adopted by the organisation). 
• Have regular communication with officers and board/council members, encouraging
them to highlight training needs on an ongoing basis.” 
In further support of the revised training requirements, CIPFA’s Better Governance Forum and Treasury
Management Network have produced a ‘self-assessment by members responsible for the scrutiny of
treasury management’, which is available from the CIPFA website to download. 
The training needs of treasury management officers are periodically reviewed. 
A formal record of the training received by officers central to the Treasury function will be maintained. 
Similarly, a formal record of the treasury management/capital finance training received by members will
also be maintained. 
At the end of January 2023 a Treasury training session from Link Group was provided to all Elected
Members and relevant officers at a Members seminar. This was followed by two further training sessions
in June 2023, again provided by Link Group, to those Elected Members who sit on the Audit and Scrutiny
Committee. Members have been advised to notify Financial Services as/when they feel further training
sessions would be beneficial.
1.5 Treasury management consultants
The Council uses Link Group, Link Treasury Services Limited as its external treasury management consultants.
Page 51

Page 52

9 
The Council recognises that responsibility for treasury management decisions remains with the organisation at
all times and will ensure that undue reliance is not placed upon the services of our external service providers.
All decisions will be undertaken with regards to all available information, including, but not solely, our treasury
advisers.
It also recognises that there is value in employing external providers of treasury management services in order
to acquire access to specialist skills and resources. The Council will ensure that the terms of their appointment
and the methods by which their value will be assessed are properly agreed and documented, and subjected to
regular review. 
Page 52

Page 53

10 
2 CAPITAL PRUDENTIAL AND TREASURY INDICATORS 2024/25 –
2026/27 
The Council’s capital expenditure plans are the key driver of treasury management activity.  The output
of the capital expenditure plans are reflected in the prudential indicators, which are designed to assist
Members’ overview and confirm capital expenditure plans.
2.1 Capital Expenditure and Financing
This prudential indicator is a summary of the Council’s capital expenditure plans, both those agreed
previously, and those forming part of the 2024/25 budget setting. 
The table below summarises the capital expenditure plans as outlined within the proposed capital plan
2024-27.
Capital Expenditure 2022/23 2023/24 2024/25 2025/26 2026/27
£'000 Actual Estimate Estimate Estimate Estimate
Executive Director - Douglas Hendry
Education 5,873 6,037 5,006 3,521 1,988
Facility Services - Shared Offices 640 1,910 3,343 977 382
Major Projects/CHORD 5,236 8,989 2,461 105 0
Executive Director - Kirsty Flanagan
ICT 1,414 1,474 1,593 1,221 688
Roads and Infrastructure 18,650 24,731 46,640 44,028 21,602
Development and Economic Growth 3,124 3,424 2,653 0 0
Live Argyll 565 1,084 636 427 382
Health and Social Care Partnership 668 972 2,085 477 382
Total 36,170 48,621 64,417 50,756 25,424 
The table below summarises the above capital expenditure plans and how capital or revenue resources
are financing them.  Any shortfall of resources results in a funding borrowing need. (The financing need
excludes other long-term liabilities, such as PFI and leasing arrangements, which already include
borrowing instruments.) 
Capital Expenditure 2022/23 2023/24 2024/25 2025/26 2026/27
£'000 Actual Estimate Estimate Estimate Estimate
Total Capital Expenditure 36,170 48,621 64,417 50,756 25,424
Financed by:
Capital Receipts 568 1,424 1,689 1,037 0
Capital Grants 22,549 20,417 8,415 8,192 7,801
Capital Reserves 0 0 0 0 0
Revenue 2,938 22,845 11,043 1,020 0
Net Financing need for the year 10,115 3,935 43,270 40,507 17,623 
Page 53

Page 54

11 
2.2  The Council’s Overall Borrowing Need (the Capital Financing Requirement)
The second prudential indicator is the Council’s Capital Financing Requirement (CFR).  The CFR is simply
the total historic outstanding capital expenditure which has not yet been paid for from either revenue or
capital resources.  It is essentially a measure of the Council’s underlying borrowing need.
Any capital expenditure above, which has not immediately been paid for through a revenue or capital
resource, will increase the CFR.
The CFR does not increase indefinitely, as prudent annual repayments from revenue need to be made,
called the Loan Fund Principal Repayment, which reflects the useful life of capital assets financed by
borrowing.  This charge reduces the CFR each year.  From 1 April 2016, authorities may choose whether
to use scheduled debt amortisation, (loans pool charges), or another suitable method of calculation in
order to repay borrowing.  
The CFR includes any other long-term liabilities (e.g. PFI schemes, finance leases).  Whilst these increase
the CFR, and therefore the Council’s borrowing requirement, these types of scheme include a borrowing
facility and so the Council is not required to separately borrow for these schemes.  The Council currently
has £111.5m of such schemes within the CFR.
The CFR projections are noted in the following table. 
2022/23 2023/24 2024/25 2025/26 2026/27
£'000 Actual Estimate Estimate Estimate Estimate
Capital Financing Requirement
Opening CFR 307,100 291,782 320,025 351,103 378,802
Closing CFR 291,782 320,025 351,103 378,802 382,743
Movement in CFR (15,318) 28,243 31,078 27,699 3,941
Movement in CFR represented by
2022/23 2023/24 2024/25 2025/26 2026/27
£'000 Actual Estimate Estimate Estimate Estimate
Net financing need for the year (above) 10,115 3,935 43,270 40,507 17,623
Service Concession Adjustment 36,038
Less scheduled debt Amortisation 25,433 11,730 12,192 12,808 13,682
Movement in CFR (15,318) 28,243 31,078 27,699 3,941 
2.3 Liability Benchmark
The Authority is required to estimate and measure the Liability Benchmark (LB) for the forthcoming
financial year and the following two financial years, as a minimum. 
There are four components to the LB: -
1 Existing loan debt outstanding: the Authority’s existing loans that are still outstanding in
future years.  
Page 54

Page 55

12 
2 Loans CFR: this is calculated in accordance with the loans CFR definition in the Prudential
Code and projected into the future based on approved prudential borrowing and planned
Loans Fund advances/Loans Fund principal repayments. 
3 Net loans requirement: this will show the Authority’s gross loan debt less treasury
management investments at the last financial year-end, projected into the future and
based on its approved prudential borrowing, planned Loans Fund principal repayments
and any other major cash flows forecast. 
4 Liability benchmark (or gross loans requirement): this equals net loans requirement plus
short-term liquidity allowance. 
The graph below shows the four components for the Council:
£0
£50,000
£100,000
£150,000
£200,000
£250,000
£300,000
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Total Amount (£'000)
Liability Benchmark
PWLB Loans Market Loans (excl LOBO loans)
LOBO Loans Short Term inc LA Temporary Borrowing (<1 year)
Variable rate loans Existing Loan Debt Outstanding
Net Loans Requirement (forecast net loan debt) Loans CFR
Liability Benchmark (Gross Loans Requirement)
2.4 Core Funds and Expected Investment Balances 
The application of resources (capital receipts, reserves etc.) to either finance capital expenditure or
other budget decisions to support the revenue budget will have an ongoing impact on investments
unless resources are supplemented each year from new sources (asset sales etc.).  Detailed below are
estimates of the year-end balances for each resource and anticipated day-to-day cash flow balances. 
Year End Resources 2022/23 2023/24 2024/25 2025/26 2026/27
£'000 Actual Estimate Estimate Estimate Estimate
Expected Investments 66,315 32,992 25,000 25,000 25,000 
Page 55

Page 56

13 
2.5  Limits to Borrowing Activity
The operational boundary:  This is the limit beyond which external debt is not normally expected to
exceed.  In most cases, this would be a similar figure to the CFR, but may be lower or higher depending
on the levels of actual debt and the ability to fund under-borrowing by other cash resources. 
Operational Boundary 2022/23 2023/24 2024/25 2025/26 2026/27
£'m Actual Estimate Estimate Estimate Estimate
Debt 198 209 246 275 283
Other long term liabilities 107 112 106 106 101
Total 305 321 352 381 384 
The authorised limit for external debt.  This is a key prudential indicator and represents a control on
the maximum level of borrowing. This represents a legal limit beyond which external debt is prohibited,
and this limit needs to be set or revised by the full Council.  It reflects the level of external debt which,
while not desired, could be afforded in the short term, but is not sustainable in the longer term.  
a) The authorised limits for external debt for the current year and two subsequent years are the
legislative limits determined under Regulation 6(1) of the Local Authority (Capital Finance and
Accounting) (Scotland) Regulations 2016.
b) The Council is asked to approve the following authorised limit: 
Authorised Limit 2022/23 2023/24 2024/25 2025/26 2026/27
£'m Actual Estimate Estimate Estimate Estimate
Debt 203 214 251 280 288
Other long term liabilities 110 115 109 109 104
Total 313 329 360 389 392  
Page 56

Page 57

14 
2.6  Statutory repayment of loans fund advances
The Council is required to set out its policy for the statutory repayment of loans fund advances prior to the start
of the financial year. The repayment of loans fund advances ensures that the Council makes a prudent provision
each year to pay off an element of the accumulated loans fund advances made in previous financial years.  
A variety of options are provided to Councils so long as a prudent provision is made each year.  A review of the
Council’s loan fund advances was undertaken during 2019-20 to ensure the Council continues to make a
prudent provision each year for the repayment of loans fund advances.
For all new loans fund advances the policy for the repayment is:- 
1.      Asset life method – loans fund advances will be repaid with reference to the life of an asset using
a 5.1% annuity rate;  
2.      Funding / Income profile method – loans fund advances will be repaid by reference to an
associated income stream. 
The annuity rate applied to current loans fund repayments is based on historic interest rates over a 15 year
period ensuring that a prudent rate is used. The current rate is 2.52%, however it is still considered prudent to
use the average historic rate at this time. 
2.7 Asset Repayment Periods
Using the asset life method, the Council is required to ensure that the debt is repaid over a period that is
reasonably commensurate with that over which the capital expenditure provides benefits. 
The table below details the repayment period that applies for each asset type. 
Asset Type
Repayment
Period
(Years)
Land (including cemeteries) 100
Road Structures - Bridges, Retaining Walls, Sea Walls, Flood Defences 60
Piers and Harbours - Major Structural Work 60
Piers and Harbours - Medium Term Works e.g painting/cathodic protection 20
Piers and Harbours - Limited Lifespan Improvements 10
Roads and Footways 20
Street Lighting 30
Vehicles & Plant 7
IT Equipment 5
Major Regeneration Works (Public Realm etc) 60
New Builds including Schools 60
Buildings -  Electrical 40
Buildings -  Plant 20
Buildings - Roofing 35
Buildings - Windows & External Doors 20
Buildings - Structural 25
Page 57

Page 58

15 
3 TREASURY MANAGEMENT STRATEGY
The capital expenditure plans set out in Section 2 provide details of the service activity of the Council.  The
treasury management function ensures that the Council’s cash is organised in accordance with the the relevant
professional codes, so that sufficient cash is available to meet this service activity.  This will involve both the
organisation of the cash flow and, where capital plans require, the organisation of approporiate borrowing
facilities.  The strategy covers the relevant treasury / prudential indicators, the current and projected debt positions
and the Annual Investment Strategy.
3.1 Current portfolio position
The Council’s treasury portfolio position at 31 March 2023 and at 31 December 2023 are shown below for both
borrowing and investments. 
A more detailed analysis of the above table showing actual investments placed with individual counterparties
can be found in Appendix 2. 
Actual Actual Current Current
31.03.23 31.03.23 31.12.23 31.12.23
Treasury investments £000 %  £000 % 
Banks 31,976 41% 37,779 52%
Building Societies - rated 0 0% 0%
Local Authorities 35,000 45% 15,000 22%
Money Market Funds 6,850 9% 4,150 21%
Certificates of Deposit 0 0% 0%
Third Party Loans 3,655 5% 3,551 5%
Total Managed In-house 77,481 100% 60,480 100%
Bond Funds 0
Property Funds 0
Total Managed Externally 0% 0 0%
Total Treasury Investments 77,481 100% 60,480 100%
Treasury External Borrowing
PWLB 82,877 58% 103,877 95%
LOBOs 39,255 28% 0 0%
Market 10,000 7% 5,255 5%
Special 8 0% 5 0%
Temporary Borrowing 10,378 7% 222 0%
Local Bonds 18 0% 18 0%
Total External Borrowing 142,536 100% 109,377 100%
Total Treasury Investments (65,055) (40,845)
TREASURY PORTFOLIO
Page 58

Page 59

16 
The Council’s forward projections for borrowing, are  summarised below. The table shows the actual external
debt (the treasury management operations), against the underlying capital borrowing need (the Capital
Financing Requirement - CFR), highlighting any over or under borrowing. 
2022/23 2023/24 2024/25 2025/26 2026/27
£'000 Actual Estimate Estimate Estimate Estimate
External Debt
Debt as 1st April 177,934 142,536 162,534 190,835 209,152
Change in Debt (In Year) (35,398) 19,998 28,301 18,317 18,320
Other long-term liabilities (OLTL) at 1st
April 116,681 111,564 105,784 105,846 100,611
Change in OLTL (In Year) (5,117) (5,780) 62 (5,235) (5,844)
Actual gross debt at 31st March 254,100 268,318 296,681 309,763 322,239
The Capital Financing Requirement 291,782 320,025 351,103 378,802 382,743
Under / (Over) borrowing 37,682 51,707 54,422 69,039 60,504 
The figures in the above tables  include an allowance for the introduction of IFRS16 – Leasing which is being
introduced in the 2024/25 financial year, having been deferred in December 2021. The change requires local
authorities to account for leased assets previously treated as operating leases (off balance sheet) as finance
leases (on balance sheet), which increases capital expenditure and the gross debt required to finance them. 
Work is underway to identify and evaluate the operating leases affected and, in the meantime, the figures used
in the calculations above represent a high level estimate of the potential impact on the Council’s Capital Financing
Requirement.
The following graph shows the the CFR compared to the expected net debt in each of the years and the under /
(over) borrowed position, also shown is the Council’s authorised limit for debt and it’s operational boundary (see
paragraph 2.4 above.
254,100
268,318
296,681
309,763
322,239 313,000
329,000
360,000
389,000 392,000
291,782
320,025
351,103
378,802 382,743 
200,000
250,000
300,000
350,000
400,000
450,000
2022/23 2023/24 2024/25 2025/26 2026/27
External Debt Authorised Limit
Operational Boundary Capital Financing Requirement
Page 59

Page 60

17 
Within the prudential indicators there are a number of key indicators to ensure that the Council operates
its activities within well-defined limits.  One of these is that the Council needs to ensure that its gross debt
does not, except in the short term, exceed the total of the CFR in the preceding year plus the estimates of any
additional CFR for 2023/24 and the following two financial years.  This allows some flexibility for limited early
borrowing for future years, but ensures that borrowing is not taken for revenue or speculative purposes.      
The Section 95 Officer reports that the Council complied with this prudential indicator in the current year
and does not envisage difficulties for the future.  This view takes into account current commitments,
existing plans, and the proposals in this budget report.  
3.2 Prospects for interest rates
The Council has appointed Link Group as its treasury advisor and part of their service is to assist
the Council to formulate a view on interest rates. Link provided the following forecasts on 7th
November 2023.  These are forecasts for certainty rates, gilt yields plus 80 bps. 
Link Group Interest Rate View  07.11.23 
Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25 Sep-25 Dec-25 Mar-26 Jun-26 Sep-26 Dec-26
BANK RATE 5.25 5.25 5.25 5.00 4.50 4.00 3.50 3.25 3.00 3.00 3.00 3.00 3.00
3 month ave earnings 5.30 5.30 5.30 5.00 4.50 4.00 3.50 3.30 3.00 3.00 3.00 3.00 3.00
6 month ave earnings 5.60 5.50 5.40 5.10 4.60 4.10 3.60 3.40 3.10 3.10 3.10 3.10 3.10
12 month ave earnings 5.80 5.70 5.50 5.20 4.70 4.20 3.70 3.50 3.30 3.30 3.30 3.30 3.30
5 yr PWLB 5.00 4.90 4.80 4.70 4.40 4.20 4.00 3.80 3.70 3.60 3.50 3.50 3.50
10 yr PWLB 5.10 5.00 4.80 4.70 4.40 4.20 4.00 3.80 3.70 3.70 3.60 3.60 3.50
25 yr PWLB 5.50 5.30 5.10 4.90 4.70 4.50 4.30 4.20 4.10 4.10 4.00 4.00 4.00
50 yr PWLB 5.30 5.10 4.90 4.70 4.50 4.30 4.10 4.00 3.90 3.90 3.80 3.80 3.80 
Additional notes by Link Group on this forecast table: - 
Our central forecast for interest rates was previously updated on 25 September and
reflected a view that the MPC would be keen to further demonstrate its anti-inflation
credentials by keeping Bank Rate at 5.25% until at least H2 2024. We expect rate cuts to
start when both the CPI inflation and wage/employment data are supportive of such a move,
and that there is a likelihood of the overall economy enduring at least a mild recession over
the coming months, although most recent GDP releases have surprised with their on-going
robustness.
Naturally, timing on this matter will remain one of fine judgment: cut too soon, and
inflationary pressures may well build up further; cut too late and any downturn or recession
may be prolonged.
In the upcoming months, our forecasts will be guided not only by economic data releases
and clarifications from the MPC over its monetary policies and the Government over its fiscal
policies, but also international factors such as policy development in the US and Europe,
the provision of fresh support packages to support the faltering recovery in China as well as
the on-going conflict between Russia and Ukraine, and Gaza and Israel.
On the positive side, consumers are still anticipated to be sitting on some excess savings
left over from the pandemic, which could cushion some of the impact of the above
challenges and may be the reason why the economy is performing somewhat better at this
stage of the economic cycle than may have been expected. However, as noted previously,
most of those excess savings are held by more affluent households whereas lower income
families already spend nearly all their income on essentials such as food, energy and
rent/mortgage payments. 
Page 60

Page 61

18 
PWLB RATES
• Gilt yield curve movements have broadened since our last Newsflash.  The short part
of the curve has not moved far but the longer-end continues to reflect inflation
concerns.  At the time of writing there is 60 basis points difference between the 5 and
50 year parts of the curve. 
The balance of risks to the UK economy: -
• The overall balance of risks to economic growth in the UK is to the downside. 
Downside risks to current forecasts for UK gilt yields and PWLB rates include: - 
• Labour and supply shortages prove more enduring and disruptive and depress economic
activity (accepting that in the near-term this is also an upside risk to inflation and, thus, could
keep gilt yields high for longer). 
• The Bank of England has increased Bank Rate too fast and too far over recent months,
and subsequently brings about a deeper and longer UK recession than we currently
anticipate. 
• UK / EU trade arrangements – if there was a major impact on trade flows and financial
services due to complications or lack of co-operation in sorting out significant remaining
issues. 
• Geopolitical risks, for example in Ukraine/Russia, the Middle East, China/Taiwan/US, Iran
and North Korea, which could lead to increasing safe-haven flows. 
Upside risks to current forecasts for UK gilt yields and PWLB rates: -
• Despite the recent tightening to 5.25%, the Bank of England proves too timid in its pace
and strength of increases in Bank Rate and, therefore, allows inflationary pressures to
remain elevated for a longer period within the UK economy, which then necessitates Bank
Rate staying higher for longer than we currently project. 
• The pound weakens because of a lack of confidence in the UK Government’s pre-election
fiscal policies, resulting in investors pricing in a risk premium for holding UK sovereign debt. 
• Longer-term US treasury yields rise strongly if inflation remains more stubborn there than
the market currently anticipates, consequently pulling gilt yields up higher.  (We saw some
movements of this type through October although generally reversed in the last week or
so.) 
• Projected gilt issuance, inclusive of natural maturities and QT, could be too much for
the markets to comfortably digest without higher yields compensating. 
LINK GROUP FORECASTS 
We now expect the MPC will keep Bank Rate at 5.25% for the remainder of 2023 and the first
half of 2024 to combat on-going inflationary and wage pressures. We do not think that the
MPC will increase Bank Rate above 5.25%, but it is possible.
Gilt yields and PWLB rates
The overall longer-run trend is for gilt yields and PWLB rates to fall back over the
timeline of our forecasts, as inflation starts to fall through the remainder of 2023
and into 2024.  
Page 61

Page 62

19 
3.3 Investment and borrowing rates
Gilt yields and PWLB rates were on a rising trend from April through to October but dropped back
significantly in November and December.
The 50-year PWLB Certainty Rate target for new long-term borrowing started 2023/24 at 3.50% (the lowest
forecast rate within a two-year time horizon), increasing to a peak of 4.00% in November.  With rates
elevated across the whole of the curve, it is advised to not borrow long-term unless the Authority wants
certainty of rate and judges the cost to be affordable. 
Borrowing for capital expenditure
Our long-term (beyond 10 years) forecast for Bank Rate has increased from 2.75% to 3% and reflects
Capital Economics’ research that suggests AI and general improvements in productivity will be supportive
of a higher neutral interest rate. As all PWLB certainty rates are currently significantly above this level,
borrowing strategies will need to be reviewed in that context. Overall, better value can generally be obtained
at the shorter end of the curve and short-dated fixed LA to LA monies should be considered. Temporary
borrowing rates will remain elevated for some time to come but may prove the best option whilst the market
continues to wait for inflation, and therein gilt yields, to drop back later in 2024.
While this authority will not be able to avoid borrowing to finance new capital expenditure, to replace
maturing debt and the rundown of reserves, there will be a cost of carry, (the difference between higher
borrowing costs and lower investment returns), to any new borrowing that causes a temporary increase in
cash balances.
3.4 Borrowing strategy 
The Council is currently maintaining an under-borrowed position.  This means that the capital borrowing
need, (the Capital Financing Requirement), has not been fully funded with loan debt as cash supporting
the Council’s reserves, balances and cash flow has been used as a temporary measure. This strategy is
prudent as medium and longer dated borrowing rates are expected to fall from their current levels once
prevailing inflation concerns are addressed by tighter near-term monetary policy.  That is, the Bank Rate
remains elevated through to the second half of 2024. 
Against this background and the risks within the economic forecast, caution will be adopted with the
2024/25 treasury operations. The Section 95 Officer will monitor interest rates in financial markets and
adopt a pragmatic approach to changing circumstances: 
• if it was felt that there was a significant risk of a sharp FALL in borrowing rates, then
borrowing will be postponed. 
• if it was felt that there was a significant risk of a much sharper RISE in borrowing rates than
that currently forecast, fixed rate funding will be drawn whilst interest rates are lower than
they are projected to be in the next few years.
Any decisions will be reported to the appropriate decision-making body at the next available opportunity.
3.5 Policy on borrowing in advance of need 
The Council will not borrow more than, or in advance of, its needs purely in order to profit from the investment
of the extra sum borrowed. Any decision to borrow in advance will be within forward approved Capital Financing
Requirement estimates, and will be considered carefully to ensure that value for money can be demonstrated
and that the Council can ensure the security of such funds. 
Risks associated with any borrowing in advance activity will be subject to prior appraisal and subsequent
reporting through the mid-year or annual reporting mechanism. 
Page 62

Page 63

20 
3.6 Debt rescheduling
Rescheduling of current borrowing in our debt portfolio may be considered whilst premature redemption
rates remain elevated but only if there is surplus cash available to facilitate any repayment, or rebalancing
of the portfolio to provide more certainty is considered appropriate. 
In 2023, there was a window of opportunity, due to the volatility of interest rates, to repay some  borrowing early
to take advantage of a discount on repayment. Rescheduling of remaining borrowing in our debt portfolio is not
currently planned for in 2024/25, however, the Council may consider rescheduling debt if an opportunity arises
and it is prudent to do so in terms of cash balances held and anticipated future interest rates.  If further
rescheduling takes place it will be reported to the appropriate Committee at the earliest meeting following its
action.
3.7 New financial institutions as a source of borrowing and / or types of borrowing
Currently the PWLB Certainty Rate is set at gilts + 80 basis points non-HRA borrowing and gilts + 40 basis
points for HRA until June 2025.  However, consideration may still need to be given to sourcing funding
from the following sources for the following reasons: 
• Local authorities (primarily shorter dated maturities out to 3 years or so – still cheaper than
the Certainty Rate).
• Financial institutions (primarily insurance companies and pension funds but also some banks,
out of forward dates where the objective is to avoid a “cost of carry” or to achieve refinancing
certainty over the next few years).
Our advisors will keep us informed as to the relative merits of each of these alternative funding sources. 
3.8  Approved Sources of Long and Short term Borrowing 
A list of approved sources of long and short term borrowing is shown below: 
On Balance Sheet  Fixed Variable
PWLB  √ √
Municipal bond agency  √ √
Local authorities  √ √
Banks  √ √
Pension funds  √ √
Insurance companies  √ √
UK Infrastructure Bank  √ √    
Market (long-term)  √ √
Market (temporary)  √ √
Market (LOBOs)  √ √
Stock issues  √ √    
Local temporary  √ √
Local Bonds  √ 
Local authority bills                                                                   √ √
Overdraft   √
Negotiable bonds  √ √    
Internal (capital receipts & revenue balances)  √ √
Commercial paper  √ 
Medium Term Notes  √ 
Finance leases  √ √
Page 63

Page 64

21 
4 ANNUAL INVESTMENT STRATEGY
4.1 Investment policy
The Council’s investment policy implements the requirements of the Local Government Investments (Scotland)
Regulations 2010, (and accompanying Finance Circular 5/2010), and the CIPFA Treasury Management in
Public Services Code of Practice and Cross Sectoral Guidance Notes 2021, (“the Code”) and CIPFA Treasury
Management Guidance Notes 2021.   
The above regulations and guidance place a high priority on the management of risk. The Council’s
investment priorities will be security first, liquidity second and  then return. This authority has adopted a
prudent approach to managing risk and defines its risk appetite by the following means:
1. Minimum acceptable credit criteria are applied in order to generate a list of highly creditworthy
counterparties.  This also enables diversification and thus avoidance of concentration risk. The key ratings
used to monitor counterparties are the short term and long-term ratings.  
2. Other information: ratings will not be the sole determinant of the quality of an institution; it is important to
continually assess and monitor the financial sector on both a micro and macro basis and in relation to the
economic and political environments in which institutions operate. The assessment will also take account
of information that reflects the opinion of the markets. To achieve this consideration the Council will
engage with its advisors to maintain a monitor on market pricing such as “credit default swaps” and
overlay that information on top of the credit ratings. 
3. Other information sources used will include the financial press, share price and other such information
pertaining to the financial sector in order to establish the most robust scrutiny process on the suitability of
potential investment counterparties.
4. This Authority has defined the list of types of investment instruments that the treasury management
team are authorised to use. There are two lists in Appendix 5 under the categories of ‘specified’ and ‘non-
specified’ investments. Lending limits, (amounts and maturity), for each counterparty will be set through
applying the matrix table in Appendix 7.
5. Transaction limits are set for each type of investment in Appendix 5.
6. This authority will set a limit for the amount of its investments which are invested for longer than 365
days, (see paragraph 4.4).
7. Investments will only be placed with counterparties from countries with a specified minimum sovereign
rating, (see paragraph 4.3).
8. All investments will be denominated in sterling.
9. As a result of the change in accounting standards for 2021/22 under IFRS 9, this authority will consider
the implications of investment instruments which could result in an adverse movement in the value of the
amount invested and resultant charges at the end of the year to the General Fund. 
However, this authority will also pursue value for money in treasury management and will monitor the yield
from investment income against appropriate benchmarks for investment performance, (see paragraph 4.4).
Regular monitoring of investment performance will be carried out during the year. 
Page 64

Page 65

22 
4.2 Creditworthiness policy 
The Council recognises the vital importance of credit-worthiness checks on the counterparties it uses for
investments. 
This Council applies the creditworthiness service provided by  Link Group.  This service employs a sophisticated
modelling approach utilising credit ratings from the three main credit rating agencies - Fitch, Moody’s and
Standard and Poor’s.  The credit ratings of counterparies are supplemented with the following further overlays:
• credit watches and credit outlooks from credit rating agencies;
• CDS spreads to give early warning of likely changes in credit ratings;
• sovereign ratings to select counterparties from only the most creditworthy countries.
Further explanation of the approach for creditworthiness used by Link Group is found in Appendix 7. 
UK banks – ring fencing
The largest UK banks, (those with more than £25bn of retail / Small and Medium-sized Enterprise (SME)
deposits), are required, by UK law, to separate core retail banking services from their investment and
international banking activities. This is known as “ring-fencing”. Whilst smaller banks with less than £25bn
in deposits are exempt, they can choose to opt in. 
Ring-fencing is a regulatory initiative created in response to the global financial crisis. It mandates the
separation of retail and SME deposits from investment banking, in order to improve the resilience and
resolvability of banks by changing their structure. In general, simpler, activities offered from within a ring-
fenced bank, (RFB), will be focused on lower risk, day-to-day core transactions, whilst more complex and
“riskier” activities are required to be housed in a separate entity, a non-ring-fenced bank, (NRFB). This is
intended to ensure that an entity’s core activities are not adversely affected by the acts or omissions of
other members of its group. 
While the structure of the banks included within this process may have changed, the fundamentals of
credit assessment have not. The Council will continue to assess the new-formed entities in the same way
that it does others and those with sufficiently high ratings, (and any other metrics considered) will be
considered for investment purposes.
4.3 Country and sector limits
The Council has determined that it will only use approved counterparties from the UK and from countries with
a minimum sovereign credit rating of AA- from Fitch. The list of countries that qualify using this credit criteria as
at the date of this report are shown in Appendix 8.  This list will be added to, or deducted from, by officers should
ratings change in accordance with this policy.
4.4 Investment strategy
In-house funds:  Investments will be made with reference to the core balance and cash flow requirements and
the outlook for short-term interest rates (i.e. rates for investments up to 24 months). Greater returns are usually
obtainable by investing for longer periods. While cash balances are required in order to manage the ups and
downs of cash flow, where cash sums can be identified that could be invested for longer periods, the value to
be obtained from longer term investments will be carefully assessed. 
• If it is thought that Bank Rate is likely to rise significantly within the time horizon being considered,
then consideration will be given to keeping most investments as being short term or variable. 
• Conversely, if it is thought that Bank Rate is likely to fall within that time period, consideration will be
given to locking in higher rates currently obtainable, for longer periods. 
Page 65

Page 66

23 
Investment returns expectations 
The current forecast shown in Appendix 3, includes a forecast for Bank Rate to stay at 5.25% until in Q2
2024 and then fall to 3.0% by Q3 2025-26. 
The suggested budgeted investment earnings rates for returns on investments placed for periods up to about
three months duration in each financial year are as follows.: 
Average earnings in each year 
2023/24 (remainder) 5.3%
2024/25 4.7%
2025/26 3.2%
2026/27 3.0%
2027/28 3.25%
Years 6 to 10 3.25%
Years 10+ 3.25% 
As there are so many variables at this time, caution must be exercised in respect of all interest rate
forecasts. 
Investment treasury indicator and limit
These limits are set with regard to the Council’s liquidity requirements and to reduce the need for early sale of
an investment, and are based on the availability of funds after each year-end.
The Council is asked to approve the treasury indicator and limit: 
2024/25 2025/26 2026/27
20 20 20
0 0 0Current investments as at 31-12-23 in excess of 1 year
maturing each year
Maximum permitted principal sums invested for longer
than 365 days
£m
Maximum principal sums invested for longer than 365 days
For its cash flow generated balances, the Council will seek to utilise its business reserve instant access and
notice accounts, money market funds and short-dated deposits (overnight to 100 days). 
Page 66

Page 67

24 
4.5 Investment risk benchmarking
This Council will use an investment benchmark to assess the investment performance of its investment portfolio
of SONIA (Sterling Overnight Interest Average).This benchmark will be used from 1st April 2022 and replaces 7
day LIBID.
4.6 End of year Investment Report
At the end of the financial year, the Council will report on its investment activity as part of its Annual Treasury
Report.
4.7 Policy on environmental, social and governance (E.S.G.)
The Council’s policy on environmental, social and governance (E.S.G) can be found in appendix 11. 
Page 67

Page 68

25 
5 APPENDICES
Appendix 1 – Capital Prudential and Treasury Indicators 2024/25 – 2026/27
1. Affordability Prudential Indicators
The previous sections cover the overall capital and control of borrowing prudential indicators, but within
this framework prudential indicators are required to assess the affordability of the capital investment plans.  
These provide an indication of the impact of the capital investment plans on the Council’s overall finances. 
The Council is asked to approve the following indicators:
Ratio of financing costs to net revenue stream
This indicator identifies the trend in the cost of capital (borrowing and other long term obligation costs net
of investment income) against the net revenue stream. 
2022/23 2023/24 2024/25 2025/26 2026/27
% Actual Estimate Estimate Estimate Estimate
Ratio 4.67% 4.54% 4.36% 4.44% 4.49%   
The estimates of financing costs include current commitments and the proposals in this budget report.
2. Maturity structure of borrowing 
The purpose of this indicator is to restrain the activity of the treasury function within certain
limits, thereby managing risk and reducing the impact of any adverse movement in interest
rates.  However, if this is set to be too restrictive it will impair the opportunities to reduce costs/
improve performance.  The indicator is “Maturity structure of borrowing”. These gross limits
are set to reduce the Council’s exposure to large fixed rate sums falling due for refinancing
and are required for upper and lower limits.  The Council is asked to approve the following
treasury indicator and limits. 
Lower Upper
Under 12 months 0% 30%
12 months to 2 years 0% 30%
2 years to 5 years 0% 30%
5 years to 10 years 0% 40%
10 years to 20 years 0% 100%
20 years to 30 years 0% 100%
30 years to 40 years 0% 100%
40 years to 50 years 0% 100%
50 years and above 0% 100%
Maturity structure of fixed interest rate borrowing 2024/25
The interest rate exposure in respect of the Council’s external debt will be monitored on an ongoing basis
by keeping the proportion of variable interest rate debt at an appropriate level given the total amount of
external debt and the interest rate environment within which the Council is operating. When interest rates
Page 68

Page 69

26 
are increasing the Council will look to move to fixed rate borrowing and if interest rates are likely to fall
then the level of variable rate borrowing will be increased to minimise future interest payments. 
2023/24 2024/25 2025/26 2026/27 2027/28
Upper Upper Upper Upper Upper
190% 190% 190% 190% 190%
60% 60% 60% 60% 60%
Interest rate exposure
Limits on fixed interest rates based on net debt
Limits on variable interest rates based on net debt 
Page 69

Page 70

27 
Appendix 2 – Detailed Current Portfolio Position
Actual Actual Current Current
31.03.23 31.03.23 31.12.23 31.12.23
Treasury investments £000 %  £000 % 
Banks Clydesdale Bank 1,976 3% 2,779 1%
Totonto Dominion Bank 5,000 7% 0 0%
First Abu Dhabi Bank 10,000 14% 15,000 23%
National Bank of Kuwait 7,500 10% 7,500 12%
Goldman Sachs 5,000 8%
Close Bros Bank 2,500 3% 2,500 4%
ANZ 5,000 7% 5,000 8%
31,976 43% 37,779 54%
Building Societies - unrated 0 0% 0 0%
Local Authorities Spelthorn BC 5,000 7% 0 0%
Thurrock Borough Council 10,000 14% 0 0%
Slough BC 10,000 14% 0 0%
Cambridgeshire CC 5,000 7% 5,000 8%
London Borough of Croydon 5,000 7% 10,000 15%
35,000 47% 15,000 23%
DMADF (H.M.Treasury) 0 0% 0 0%
Money Market FundsBNP 6,850 9% 0 0%
Federated 1,600 20%
Legal & General 2,550 3%
6,850 9% 4,150 22%
Certificates of Deposit 0 0% 0 0%
Total Treasury Investments 73,826 100% 56,929 100%
TREASURY PORTFOLIO
Page 70

Page 71

28 
Actual Actual Current Current
31.03.23 31.03.23 30.12.23 31.12.23
Treasury external borrowing £000 %  £000 % 
Local Authorities 0 0% 0 0%
PWLB 82,877 58% 103,877 95%
LOBOs Commerzbank Finance & Covered
Bonds S.A.
13,000 9% 0 0%
FMS Wertmanagement 5,255 4% 5,255 5%
Bayerische Landesbank 21,000 15% 0 0%
39,255 28% 5,255 5%
Market Barclays (formerly LOBO) 10,000 7% 0 0%
10,000 7% 0 0%
Special Prudential assurance co 8 0% 5 0%
8 0% 5 0%
Temporary Borrowing 10,378 7% 222 0%
Local Bonds 18 0% 18 0%
Total External Borrowing 142,536 100% 109,377 100%
Net Treasury Investments / (Borrowing) (68,710) (44,431) 
Page 71

Page 72

29 
Appendix 3 – Economic Background Provided by Link Group (at 04.04.24)
• The third quarter of 2023/24 saw: 
- A 0.3% m/m decline in real GDP in October, potentially partly due to
unseasonably wet weather, but also due to the ongoing drag from higher
interest rates.  Growth for the second quarter, ending 30th September, was
revised downwards to -0.1% and growth on an annual basis was also revised
downwards, to 0.3%; 
- A sharp fall in wage growth, with the headline 3myy rate declining from 8.0%
in September to 7.2% in October, although the ONS “experimental” rate of
unemployment has remained low at 4.2%;
- CPI inflation continuing on its downward trajectory, from 8.7% in April to 4.6%
in October, then again to 3.9% in November;
- Core CPI inflation decreasing from April and May’s 31 years’ high of 7.1% to
5.1% in November, the lowest rate since January 2022;
- The Bank of England holding rates at 5.25% in November and December;
- A steady fall in 10-year gilt yields as investors revised their interest rate
expectations lower.
• The revision of GDP data in Q2 to a 0.1% q/q fall may mean the mildest of mild
recessions has begun. Indeed, real GDP in October fell 0.3% m/m which does
suggest that the economy may stagnate again in Q3. The weakness in October
may partly be due to the unseasonably wet weather. That said, as the weakness
was broad based it may also be the case that the ongoing drag from higher interest
rates is more than offsetting any boost from the rise in real wages.
• However, the rise in the flash composite activity Purchasing Managers Index, from
50.7 in November to 51.7 in December, did increase the chances of the economy
avoiding a contraction in Q3. The improvement was entirely driven by the increase
in the services activity balance from 50.9 to 52.7. (Scores above 50 point to
expansion in the economy, although only tepid in this instance.)  The press release
noted that this was primarily driven by a revival in consumer demand in the
technological and financial services sectors. This chimes with the further
improvement in the GfK measure of consumer confidence in December, from -24
to -22. The services PMI is now consistent with non-retail services output growing
by 0.5% q/q in Q3, but this is in stark contrast to the manufacturing sector where
the output balance slumped from 49.2 to 45.9 and, at face value, the output
balance is consistent with a 1.5% q/q fall in manufacturing output in Q3.
• The 0.3% m/m fall in retail sales volumes in October means that after contracting
by 1.0% q/q (which was downwardly revised from -0.8% q/q) in Q2, retail activity
remained weak at the start of Q3. That suggests higher interest rates are taking a
bigger toll on real consumer spending. 
• Higher interest rates have filtered through the financial channels and weakened
the housing market but, overall, it remains surprisingly resilient with only marginal
falls showing year on year on the Halifax (-1%) and Nationwide (-1.8%) indices. 
However, the full weakness in real consumer spending and real business
investment has yet to come as currently it is estimated that around two thirds to a
Page 72

Page 73

30 
half of the impact of higher interest rates on household interest payments has yet
to be felt. 
• Overall, we expect real GDP growth to remain subdued throughout 2024 as the
drag from higher interest rates is protracted but a fading of the cost-of-living crisis
and interest rate cuts in the second half of 2024 will support a recovery in GDP
growth in 2025.
• The labour market remains tight by historical standards, but the sharp fall in wage
growth seen in October will reinforce the growing belief in markets that interest
rates will be cut mid-2024. Wage growth eased in October much faster than the
consensus expected. Total earnings fell by 1.6% m/m, which meant the headline
3myy rate eased from 8.0% in September to 7.2% in October. This news will be
welcomed by the Bank of England. Indeed, the timelier three-month annualised
rate of average earnings growth fell from +2.4% to -1.2%. Excluding bonuses, it
fell from 5.3% to 2.0%. Furthermore, one of the Bank’s key barometers of inflation
persistence, regular private sector pay growth, dropped from 7.9% 3myy to 7.3%,
which leaves it comfortably on track to fall to 7.2% by December, as predicted by
the Bank in November. 
• The fall in wage growth occurred despite labour demand being stronger in October
than expected. The three-month change in employment eased only a touch from
+52,000 in September to +50,000 in October. But resilient labour demand was
offset by a further 63,000 rise in the supply of workers in the three months to
October. That meant labour supply exceeded its pre-pandemic level for the first
time, and the unemployment rate remained at 4.2% in October. In the three
months to November, the number of job vacancies fell for the 17th month in a row,
from around 959,000 in October to around 949,000. That has reduced the vacancy
to unemployment ratio as demand for labour eases relative to supply, which may
support a further easing in wage growth in the coming months.
• CPI inflation fell from 6.7% in September to 4.6% in October, and then again to
3.9% in November. Both these falls were bigger than expected and there are clear
signs of easing in domestic inflationary pressures. The fall in core CPI inflation
from 5.7% to 5.1% in November was bigger than expected (consensus forecast
5.6%). That’s the lowest rate since January 2022. Some of the decline in core
inflation was due to the global influence of core goods inflation, which slowed from
4.3% to 3.3%. But some of it was due to services inflation falling from 6.6% to
6.3%. The Bank views the latter as a key barometer of the persistence of inflation
and it came in further below the Bank’s forecast of 6.9% in its November Monetary
Policy Report. This will give the Bank more confidence that services inflation is
now on a firmly downward path. 
• The Bank of England sprung no surprises with its December monetary policy
committee (MPC) meeting, leaving interest rates at 5.25% for the third time in a
row and pushing back against the prospect of near-term interest rate cuts. The
Bank continued to sound hawkish, with the MPC maintaining its tightening bias
saying that “further tightening in monetary policy would be required if there were
evidence of more persistent inflationary pressures”. And it stuck to the familiar
script, saying that policy will be “sufficiently restrictive for sufficiently long” and that
“monetary policy is likely to need to be restrictive for an extended period of time”.
Page 73

Page 74

31 
In other words, the message is that the MPC is not yet willing to endorse investors’
expectations that rates will be cut as soon as May 2024.
• Looking ahead, our colleagues at Capital Economics forecast that the recent
downward trends in CPI and core inflation will stall over the next few months before
starting to decline more decisively again in February. That explains why we think
the Bank of England won’t feel comfortable cutting interest rates until H2 2024. 
• The fall in UK market interest rate expectations in December has driven most of
the decline in 10-year gilt yields, which have fallen in line with 10-year US Treasury
and euro-zone yields. 10-year gilt yields have fallen from 4.68% in October 2023
to around 3.70% at the time of writing, with further declines likely if the falling
inflation story is maintained.
• Investors’ growing expectations that the Fed will cut interest rates soon has led to
an improvement in risk sentiment, which has boosted the pound and other risky
assets. In addition, the rise in the pound, from $1.21 in November to $1.27 now,
has also been supported by the recent relative decline in UK wholesale gas prices. 
• The further fall in 10-year real gilt yields in December has supported the recent
rise in the FTSE 100. That said, the index remains 5% below its record high in
February. This modest rise in equities appears to have been mostly driven by
strong performances in the industrials and rate-sensitive technology sectors. But
UK equities have continued to underperform US and euro-zone equities. The
FTSE 100 has risen by 2.2% in December, while the S&P 500 has risen by 3.8%.
This is partly due to lower energy prices, which have been a relatively bigger drag
on the FTSE 100, due to the index’s high concentration of energy companies. 
In the chart below, the rise in gilt yields across the curve in the first half of 2023/24,
and therein PWLB rates, is clear to see, prior to the end of year rally based on a mix
of supportive domestic and international factors. 
PWLB RATES 03.04.23 - 29.12.23 
3.00%
3.40%
3.80%
4.20%
4.60%
5.00%
5.40%
5.80%
6.20%
6.60%
7.00%
PWLB Rates 3.4.23 - 29.12.23
1 Year 5 Year 10 Year 25 Year 50 Year 50 year target %
Page 74

Page 75

32 
HIGH/LOW/AVERAGE PWLB RATES FOR 01.04.23 – 29.09.23 
The peak in medium to longer dated rates has generally arisen in August and September and
has been primarily driven by continuing high UK inflation, concerns that gilt issuance may be
too much for the market to absorb comfortably, and unfavourable movements in US Treasuries. 
The S&P 500 and FTSE 100 have struggled to make much ground through 2023. 
CENTRAL BANK CONCERNS 
Currently, the Fed has pushed up US rates to a range of 5.25% to 5.5%, whilst the MPC
followed by raising Bank Rate to 5.25%.  EZ rates have also increased to 4% with further
tightening a possibility. 
Ultimately, however, from a UK perspective it will not only be inflation data but also employment
data that will mostly impact the decision-making process, although any softening in the interest
rate outlook in the US may also have an effect (just as, conversely, greater tightening may
also). 
1 Year 5 Year 10 Year 25 Year 50 Year
Low 4.65% 4.14% 4.20% 4.58% 4.27%
Date 06/04/2023 06/04/2023 06/04/2023 06/04/2023 05/04/2023
High 6.36% 5.93% 5.51% 5.73% 5.45%
Date 06/07/2023 07/07/2023 22/08/2023 17/08/2023 28/09/2023
Average 5.62% 5.16% 5.01% 5.29% 5.00%
Spread 1.71% 1.79% 1.31% 1.15% 1.18%
Page 75

Page 76

33 
Appendix 4 - Treasury Management Practice (TMP1) Permitted Investments
This Council approves the following forms of investment instrument for use as permitted
investments as set out in table 1. 
Treasury risks
All the investment instruments in table 1 are subject to the following risks: - 
• Credit and counter-party risk: this is the risk of failure by a counterparty (bank or
building society) to meet its contractual obligations to the organisation particularly as a
result of the counterparty’s diminished creditworthiness, and the resulting detrimental
effect on the organisation’s capital or current (revenue) resources. There are no
counterparties where this risk is zero although AAA rated organisations have the
highest, relative, level of creditworthiness. 
• Liquidity risk: this is the risk that cash will not be available when needed.   Whilst it
could be said that all counterparties are subject to at least a very small level of liquidity
risk as credit risk can never be zero, in this document, liquidity risk has been treated as
whether or not instant access to cash can be obtained from each form of investment
instrument.  However, it has to be pointed out that while some forms of investment e.g.
gilts, CDs, corporate bonds can usually be sold immediately if the need arises, there
are two caveats: - 
a. Cash may not be available until a settlement date up to three days after the
sale  
b. There is an implied assumption that markets will not freeze up and so the
instrument in question will find a ready buyer.  
The column in table 1 headed as ‘market risk’ will show each investment instrument
as being instant access, sale T+3 = transaction date plus 3 business days before you
get cash, or term i.e. money is locked in until an agreed maturity date. 
• Market risk: this is the risk that, through adverse market fluctuations in the value of the
principal sums an organisation borrows and invests, its stated treasury management
policies and objectives are compromised, against which effects it has failed to protect
itself adequately.  However, some cash rich local authorities may positively want
exposure to market risk e.g. those investing in investment instruments with a view to
obtaining a long-term increase in value. 
• Interest rate risk: this is the risk that fluctuations in the levels of interest rates create
an unexpected or unbudgeted burden on the organisation’s finances, against which the
organisation has failed to protect itself adequately.  This authority has set limits for its
fixed and variable rate exposure in its Treasury Indicators in this report.  All types of
investment instrument have interest rate risk except for the following forms of
instrument which are at variable rate of interest (and the linkage for variations is also
shown). 
• Legal and regulatory risk: this is the risk that the organisation itself, or an organisation
with which it is dealing in its treasury management activities, fails to act in accordance
with its legal powers or regulatory requirements, and that the organisation suffers losses
accordingly.    
Page 76

Page 77

34 
Controls on treasury risks
• Credit and counter-party risk: this authority has set minimum credit criteria to determine which
counterparties and countries are of sufficiently high creditworthiness to be considered for
investment purposes.  See paragraphs 4.2 and 4.3. 
• Liquidity risk: this authority has a cash flow forecasting model to enable it to determine how
long investments can be made for and how much can be invested. 
• Market risk: this authority purchases Certificates of Deposit (CD’s), as they offer a higher rate
of return than depositing in the DMADF. They are usually held until maturity but in exceptional
circumstances, they can be quickly sold at the current market value, (which may vary from the
purchase cost), if the need arises for extra cash at short notice. Their value does not usually
vary much during their short life. 
• Interest rate risk: this authority manages this risk by having a view of the future course of
interest rates and then formulating a treasury management strategy accordingly which aims to
maximise investment earnings consistent with control of risk or alternatively, seeks to minimise
expenditure on interest costs on borrowing.  See paragraph 4.4. 
• Legal and regulatory risk: this authority will not undertake any form of investing until it has
ensured that it has all necessary powers and complied with all regulations.  
Unlimited investments
Regulation 24 states that an investment can be shown in table 1 as being ‘unlimited’ in terms of the
maximum amount or percentage of the total portfolio that can be put into that type of investment.  However,
it also requires that an explanation must be given for using that category.  
The authority has given the following types of investment an unlimited category: - 
• Debt Management Agency Deposit Facility.  This is considered to be the lowest risk form of
investment available to local authorities as it is operated by the Debt Management Office which
is part of H.M. Treasury i.e. the UK Government’s sovereign rating stands behind the DMADF. 
It is also a deposit account and avoids the complications of buying and holding Government
issued treasury bills or gilts. 
• High credit worthiness banks and building societies.  See paragraph 4.2 for an explanation
of this authority’s definition of high credit worthiness.  While an unlimited amount of the
investment portfolio may be put into banks and building societies with high credit worthiness,
the authority will ensure diversification of its portfolio ensuring that no more than £20m of the
total portfolio can be placed with UK banks and £15m in any single non UK bank institution or
group at any one time.
Page 77

Page 78

35 
Objectives of each type of investment instrument
Regulation 25 requires an explanation of the objectives of every type of investment instrument
which an authority approves as being ‘permitted’. 
Deposits
The following forms of ‘investments’ are actually more accurately called deposits as cash is
deposited in an account until an agreed maturity date or is held at call. 
• Debt Management Agency Deposit Facility.  This offers the lowest risk form of
investment available to local authorities as it is effectively an investment placed with the
Government.  It is also easy to use as it is a deposit account and avoids the
complications of buying and holding Government issued treasury bills or gilts.  As it is
low risk it also earns low rates of interest.  However, it is very useful for authorities
whose overriding priority is the avoidance of risk.  The longest period for a term deposit
with the DMADF is 6 months. 
• Term deposits with high credit worthiness banks and building societies.  See
paragraph 4.2 for an explanation of this authority’s definition of high credit worthiness. 
This is the most widely used form of investing used by local authorities.  It offers a much
higher rate of return than the DMADF (dependent on term). The authority will ensure
diversification of its portfolio of deposits ensuring that no more than £20m of the total
portfolio can be placed with any UK bank and £15m with any single non UK bank
institution or group.  In addition, longer-term deposits offer an opportunity to increase
investment returns by locking in high rates ahead of an expected fall in the level of
interest rates.  At other times, longer-term rates can offer good value when the markets
incorrectly assess the speed and timing of interest rate increases.  This form of investing
therefore, offers a lot of flexibility and higher earnings than the DMADF.  Where it is
restricted is that once a longer-term investment is made, that cash is locked in until the
maturity date. 
• Call accounts with high credit worthiness banks and building societies.  The
objectives are as for term deposits above but there is instant access to recalling cash
deposited.  This generally means accepting a lower rate of interest than that which
could be earned from the same institution by making a term deposit.  Some use of call
accounts is highly desirable to ensure that the authority has ready access to cash when
needed to pay bills. 
• Fixed term deposits with variable rate and variable maturities (structured
deposits).  This line encompasses ALL types of structured deposits.  There has been
considerable change in the types of structured deposits brought to the market over the
last few years, some of which are already no longer available.  In view of the fluidity of
this area, this is a generic title for all structured deposits so as to provide councils with
greater flexibility to adopt new instruments as and when they are brought to the market. 
However, this does mean that members ought to be informed as to what instruments
are presently under this generic title so that they are aware of the current situation, and
that they are informed and approve of intended changes in an appropriate manner.   
• Collateralised deposits.  These are deposits placed with a bank which offers collateral
backing based on specific assets. Examples seen in the past have included local
authority LOBOs, where such deposits are effectively lending to a local authority as that
is the ultimate security.  
Page 78

Page 79

36 
DEPOSITS WITH COUNTERPARTIES CURRENTLY IN RECEIPT OF GOVERNMENT
SUPPORT / OWNERSHIP
These banks offer another dimension of creditworthiness in terms of Government backing through
either partial or full direct  ownership.  The view of this authority is that such backing makes these
banks attractive institutions with whom to place deposits, and that will remain our view if the UK
sovereign rating were to be downgraded in the coming year. 
• Term deposits with high credit worthiness banks which are fully or semi
nationalised. As for term deposits in the previous section, but Government full, (or
substantial partial), ownership, implies that the Government stands behind this bank
and will be deeply committed to providing whatever support that may be required to
ensure the continuity of that bank.  This authority considers that this indicates a low and
acceptable level of residual risk.
• Fixed term deposits with variable rate and variable maturities (structured
deposits).  This line encompasses ALL types of structured deposits.  There has been
considerable change in the types of structured deposits brought to the market over the
last few years, some of which are already no longer available.  In view of the fluidity of
this area, this is a generic title for all structured deposits so as to provide councils with
greater flexibility to adopt new instruments as and when they are brought to the market. 
However, this does mean that members ought to be informed as to what instruments
are presently covered under this generic title so that they are aware of the current
situation, and that they are informed and approve of intended changes in an appropriate
manner. 
COLLECTIVE INVESTMENT SCHEMES STRUCTURED AS OPEN ENDED INVESTMENT
COMPANIES (OEICS)
• Government liquidity funds.  These are the same as money market funds (see
below) but only invest in government debt issuance with highly rated governments.  Due
to the higher quality of underlying investments, they offer a lower rate of return than
MMFs. However, their net return is typically on a par with the DMADF, but with instant
access.
• Money Market Funds (MMFs).  By definition, MMFs are AAA rated and are widely
diversified, using many forms of money market securities including types which this
Authority does not currently have the expertise or capabilities to hold directly.  However,
due to the high level of expertise of the fund managers and the huge amounts of money
invested in MMFs, and the fact that the weighted average maturity (WAM) cannot
exceed 60 days, MMFs offer a combination of high security, instant access to funds,
high diversification and good rates of return compared to equivalent instant access
facilities. They are particularly advantageous in falling interest rate environments as
their 60 day WAM means they have locked in investments earning higher rates of
interest than are currently available in the market.  MMFs also help an authority to
diversify its own portfolio as e.g., a £2m investment placed directly with HSBC is a 100%
risk exposure to HSBC whereas £2m invested in a MMF may end up with say £10,000
being invested with HSBC through the MMF.  For authorities particularly concerned
with risk exposure to banks, MMFs offer an effective way of minimising risk exposure
while still getting much better rates of return than available through the DMADF.  
a. Ultra short dated bond funds.  These funds are similar to MMFs, can still be AAA
rated but have Variable Net Asset Values (VNAV) as opposed to a traditional MMF
which has a Constant Net Asset Value (CNAV). They aim to achieve a higher yield and
to do this either take more credit risk or invest out for longer periods of time, which
Page 79

Page 80

37 
means they are more volatile. These funds can have WAM’s and Weighted Average
Life (WAL’s) of 90 – 365 days or even longer. Their primary objective is yield and capital
preservation is second. They therefore, are a higher risk than MMFs and
correspondingly have the potential to earn higher returns than MMFs. 
• Gilt funds.  These are funds which invest only in U.K. Government gilts.  They offer a
lower rate of return than bond funds but are highly rated both as a fund and through
investing only in highly rated government securities.  They offer a higher rate of return
than investing in the DMADF but they do have an exposure to movements in market
prices of assets held. 
• Bond funds.  These can invest in both government and corporate bonds.  This
therefore entails a higher level of risk exposure than gilt funds and the aim is to achieve
a higher rate of return than normally available from gilt funds by trading in non-
government bonds.  
SECURITIES ISSUED OR GUARANTEED BY GOVERNMENTS 
The following types of investments are where an authority directly purchases a particular
investment instrument, a security, i.e. it has a market price when purchased and that value can
change during the period the instrument is held until it matures or is sold.  The annual earnings
on a security is called a yield i.e. it is normally the interest paid by the issuer divided by the price
you paid to purchase the security unless a security is initially issued at a discount e.g. treasury
bills. 
• Treasury bills.  These are short-term bills, (up to 18 months but usually 9 months or
less), issued by the Government and so are backed by the sovereign rating of the UK. 
The yield is higher than the rate of interest paid by the DMADF and another advantage
compared to a time deposit in the DMADF is that they can be sold if there is a need for
access to cash at any point in time.  However, there is a spread between purchase and
sale prices so early sales could incur a net cost during the period of ownership. 
• Gilts.  These are longer-term debt issuance by the UK Government and are backed by
the sovereign rating of the UK. The yield is higher than the rate of interest paid by the
DMADF and another advantage compared to a time deposit in the DMADF is that they
can be sold if there is a need for access to cash at any point in time.  However, there is
a spread between purchase and sale prices so early sales may incur a net cost. Market
movements that occur between purchase and sale may also have an adverse impact
on proceeds. The advantage over Treasury bills is that they generally offer higher yields
the longer it is to maturity (for most periods) if the yield curve is positive. 
• Bond issuance issued by a financial institution which is explicitly guaranteed by
the UK Government e.g. National Rail.  This is similar to a gilt due to the explicit
Government guarantee. 
• Sovereign bond issues (other than the UK govt) denominated in Sterling.  As for
gilts but issued by other nations.  Use limited to issues of nations with at least the same
sovereign rating as for the UK. 
• Bonds issued by Multi Lateral Development Banks (MLDBs).  These are similar to
c. and e. above but are issued by MLDBs which are typically guaranteed by a group of
sovereign states e.g. European Bank for Reconstruction and Development. 
Page 80

Page 81

38 
SECURITIES ISSUED BY CORPORATE ORGANISATIONS 
The following types of investments are where an authority directly purchases a particular
investment instrument, a security, i.e. it has a market price when purchased and that value can
change during the period the instrument is held until it is sold.  The annual earnings on a security
is called a yield i.e. is the interest paid by the issuer divided by the price you paid to purchase the
security.  These are similar to the previous category but corporate organisations can have a wide
variety of credit worthiness so it is essential for local authorities to only select the organisations
with the highest levels of credit worthiness.  Corporate securities are generally a higher risk than
government debt issuance and so earn higher yields. 
a. Certificates of deposit (CDs).  These are shorter-term securities issued by deposit
taking institutions (mainly financial institutions). They are negotiable instruments, so can
be sold ahead of maturity and also purchased after they have been issued.  However,
that liquidity can come at a price, where the yield could be marginally less than placing
a deposit with the same bank as the issuing bank. 
b. Commercial paper.  This is similar to CDs but is issued by commercial
organisations or other entities.  Maturity periods are up to 365 days but commonly
90 days.   
c. Corporate bonds.  These are (long term) bonds (usually bearing a fixed rate of
interest) issued by a financial institution, company or other non-government issuer
in order to raise capital for the institution as an alternative to issuing shares or
borrowing from banks.  They are generally seen to be of a lower creditworthiness
than government issued debt and so usually offer higher rates of yield. 
d. Floating rate notes.  These are bonds on which the rate of interest is established
periodically with reference to short-term interest rates.  
OTHER
Property fund.  This is a collective investment fund specialising in property.  Rather than
owning a single property with all the risk exposure that means to one property in one location
rising or falling in value, maintenance costs, tenants actually paying their rent / lease etc, a
collective fund offers the advantage of diversified investment over a wide portfolio of different
properties.  This can be attractive for authorities who want exposure to the potential for the
property sector to rise in value.  However, timing is critical to entering or leaving this sector
at the optimum times of the property cycle of rising and falling values. Typically, the minimum
investment time horizon for considering such funds is at least 3-5 years.  
Page 81

Page 82

39 
Table 1: permitted investments in house 
This table is for use by the in house treasury management team.  
1.1  Deposits 
* Minimum Credit
Criteria / colour
banding 
Liquidity
risk
Market
risk
Max %  
of total
investments
Max. maturity
period
Debt Management Agency Deposit
Facility --  term no 100 6 months
Term deposits – local authorities   --  term  no 100 2 years
Call accounts – banks and building
societies 
Yellow
Purple
Blue
Orange
Red
Green
No Colour 
instant  no
100
Up to 5 yrs
Up to 2 yrs
Up to 1 yr
Up to 1 yr
Up to 6 mths
Up to 100 days
Not for use
Term deposits – banks and building
societies 
Yellow
Purple
Blue
Orange
Red
Green
No Colour 
term  no
100 
Up to 5 yrs
Up to 2 yrs
Up to 1 yr
Up to 1 yr
Up to 6 mths
Up to 100 days
Not for use
Fixed term deposits with variable
rate and variable maturities: -
Structured deposits. 
Green term no 50 2 years
Collateralised deposit  (see note 1) UK sovereign
rating  term  no 50 1 year 
Note 1. As collateralised deposits are backed by e.g. AAA rated local authority LOBOs, this
investment instrument is effectively a AAA rated investment 
1.2 Deposits with counterparties currently in receipt of government support / ownership 
* Minimum Credit
Criteria / colour
banding 
Liquidity
risk
Market
risk
Max %  of
total
investments
Max.
maturity
period
UK  part nationalised banks Blue  term  no 100 1 Year
Banks part nationalised by high
credit rated (sovereign rating)
countries – non UK
UK Sovereign Rating
or Blue  term  no 100 1 Year
Fixed term deposits with variable
rate and variable maturities: -
Structured deposits  
Green term yes 100 1 Year 
Page 82

Page 83

40 
1.3 Collective investment schemes structured as Open Ended Investment Companies
(OEICs) 
* Minimum Fund
Rating  Liquidity
risk
Market
risk
Max %  of
total
investments
Max.
maturity
period    
1a. Money Market Funds CNAV AAA  instant 
No
see note 1  100 1 Year    
1b. Money Market Funds LVNAV AAA  Instant  to
T+5 
No
see note 1  100 1 Year    
1c. Money Market Funds VNAV AAA  instant to
T+5 
No
see note 1  100 1 Year    
2. Ultra short dated bond funds
with a credit score of 1.25   AAA  T+1 to T+5  yes 100 1 Year     
3. Ultra short dated bond funds
with a credit score of 1.5   AAA  T+1 to T+5  yes 100 1 Year    
4. Bond Funds    AAA  T+2 or
longer 
yes 100 1 Year    
5. Gilt Funds UK sovereign rating
T+2 or
longer  yes 100 1 Year 
Note 1. The objective of MMFs is to maintain the net asset value but they hold assets which
can vary in value.  However, the credit rating agencies require the fluctuation in unit values
held by investors to vary by almost zero. 
1.4 Securities issued or guaranteed by governments 
* Minimum Credit
Criteria  Liquidity
risk
Market
risk 
Max % 
of total
investments
Max.
maturity
period
Treasury Bills UK sovereign rating  Sale T+1  yes 100 1 Year
UK Government Gilts UK sovereign rating   Sale T+1  yes 100 1 Year
Bond issuance issued by a financial
institution which is explicitly
guaranteed by  the UK Government 
e.g. National Rail
UK sovereign rating  Sale T+3  yes 100 1 Year
Sovereign bond issues (other than
the UK govt) AAA  Sale T+1  yes 80 1 Year
Bonds issued by multilateral
development banks  AAA  Sale T+1  yes 80 1 Year 
Page 83

Page 84

41 
1.5 Securities issued by corporate organisations 
* Minimum Credit
Criteria  Liquidity
risk
Market
risk 
Max % 
of total
investments
Max.
maturity
period
Certificates of deposit issued by
banks and building societies  Green  Sale T+0  yes 50 2 Years
Commercial paper other  Green  Sale T+0  yes 20 2 Years
Floating rate notes Green  Sale T+0  yes 20 2 Years
Corporate Bonds other  Green  Sale T+3  yes 20 2 Years 
Accounting treatment of investments.  The accounting treatment may differ from the
underlying cash transactions arising from investment decisions made by this Council. To ensure
that the Council is protected from any adverse revenue impact, which may arise from these
differences, we will review the accounting implications of new transactions before they are
undertaken. 
1.6 Other 
* Minimum Credit
Criteria / fund rating  Liquidity
risk
Market
risk 
Max % 
of total
investments
Max.
maturity
period 
Property funds  --  T+4  yes 100 5 Years 
Page 84

Page 85

42 
Appendix 5 – Treasury Management Practice (TMP2) Credit and Counterparty Risk Management 
The following table is for use by the Treasury team and is a list of current counterparties. However, the use of counterparties depends on credit
ratings and the Council may stop using certain counterparties and may stop using certain counterparties and/or decide to use alternative
counterparties within its permitted investments.  If for unavoidable short term operation reasons, limits are breached this will be communicated
to management immediately.  
The Monitoring of Investment Counterparties - The status of counterparties will be monitored regularly.  The Council receives credit rating and market
information from Link Group, including when ratings change, and counterparties are checked promptly.  On occasion ratings may be downgraded when
an investment has already been made.  The criteria used are such that a minor downgrading should not affect the full receipt of the principal and interest. 
Any counterparty failing to meet the criteria will be removed from the list immediately by the Section 95 Officer, and if required new counterparties which
meet the criteria will be added to the list. 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
Cash type instruments
a. Deposits with the Debt
Management Account
Facility (UK Government)
(Very low risk)
This is a deposit with the UK
Government and as such counterparty
and liquidity risk is very low, and there
is no risk to value.  Deposits can be
between overnight and 6 months.
Little mitigating controls required.  As this
is a UK Government investment the
monetary limit is unlimited to allow for a
safe haven for investments.
£unlimited,
maximum 6
months.
£unlimited,
maximum 6
months.
b. Deposits with other local
authorities or public
bodies (Very low risk)
These are considered quasi UK
Government debt and as such
counterparty risk is very low, and there
is no risk to value.  Liquidity may
present a problem as deposits can
only be broken with the agreement of
the counterparty, and penalties can
apply.
Little mitigating controls required for local
authority deposits, as this is a quasi UK
Government investment.
Non- local authority deposits will follow
the approved credit rating criteria.
£unlimited,
maximum 2
year.
Limit of
£10m per
local
Authority or
public body
£unlimited,
maximum 2
years.
Page 85

Page 86

43 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
Deposits with other non-local authority
bodies will be restricted to the overall
credit rating criteria.
c. Money Market Funds
(MMFs) –
CNAV/LVNAV/VNAV(Low
to very low risk) 
Pooled cash investment vehicle which
provides very low counterparty,
liquidity and market risk.  These will
primarily be used as liquidity
instruments.
Funds will only be used where the MMFs
has a “AAA” rated status from either Fitch,
Moody’s or Standard and Poor’s.
£15m per
fund 
100% 
d. Ultra short dated bond
funds (low risk)
Pooled cash investment vehicle which
provides very low counterparty,
liquidity and market risk.  These will
primarily be used as liquidity
instruments.
Funds will only be used where the have a
“AAA” rated status from either Fitch,
Moody’s or Standard and Poor’s.
£15m per
fund
100% 
e. Call account deposit
accounts with financial
institutions (banks and
building societies) (Low
risk depending on
credit rating)
These tend to be low risk investments,
but will exhibit higher risks than
categories (a), (b) and (c) above. 
Whilst there is no risk to value with
these types of investments, liquidity is
high and investments can be returned
at short notice.  
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’sDay to
day investment dealing with this criteria
will be further strengthened by use of
additional market intelligence.
As shown in
the
counterparty
section
criteria
above.
As shown in
the
counterparty
section
criteria
above.
f. Term deposits with
financial institutions
(banks and building
societies) (Low to
medium risk depending
These tend to be low risk investments,
but will exhibit higher risks than
categories (a), (b) and (c) above. 
Whilst there is no risk to value with
these types of investments, liquidity is
low and term deposits can only be
The counterparty selection criteria approved
above restricts lending only to high quality
counterparties, measured primarily by credit
ratings from Fitch, Moody’s and Standard
and Poor’s.  Day to day investment dealing
with this criteria will be further strengthened
by use of additional market intelligence.
As shown in
the
counterparty
section
criteria
above.
As shown in
the
counterparty
section
criteria
above.
Page 86

Page 87

44 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
on period & credit
rating) 
broken with the agreement of the
counterparty, and penalties may apply.  
g. Government Gilts and
Treasury Bills (Very low
risk)
These are marketable securities
issued by the UK Government and as
such counterparty and liquidity risk is
very low, although there is potential
risk to value arising from an adverse
movement in interest rates (no loss if
these are held to maturity.  
Little counterparty mitigating controls are
required, as this is a UK Government
investment.   The potential for capital loss
will be reduced by limiting the maximum
monetary and time exposures.
£10m
maximum 1
year.
100%
maximum 1
year.
h. Certificates of deposits
with financial institutions
(Low risk)
These are short dated marketable
securities issued by financial
institutions and as such counterparty
risk is low, but will exhibit higher risks
than categories (a), (b) and (c) above. 
There is risk to value of capital loss
arising from selling ahead of maturity if
combined with an adverse movement
in interest rates (no loss if these are
held to maturity).  Liquidity risk will
normally be low.
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’s.  Day
to day investment dealing with this criteria
will be further strengthened by the use of
additional market intelligence.
£10m per
counterparty
maximum  
1 year.
20%
maximum 1
year.
i. Structured deposit
facilities with banks and
building societies
(escalating rates, de-
escalating rates etc.)
(Low to medium risk
These tend to be medium to low risk
investments, but will exhibit higher
risks than categories (a), (b) and (c)
above.  Whilst there is no risk to value
with these types of investments,
liquidity is very low and investments
can only be broken with the agreement
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’s.  Day
to day investment dealing with this criteria
As shown in
the
counterparty
section
criteria
above.
As shown in
the
counterparty
section
criteria
above.
Page 87

Page 88

45 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
depending on period &
credit rating)
of the counterparty (penalties may
apply).  
will be further strengthened by the use of
additional market intelligence.
j. Corporate bonds
(Medium to high risk
depending on period &
credit rating)
These are marketable securities
issued by financial and corporate
institutions. Counterparty risk will vary
and there is risk to value of capital loss
arising from selling ahead of maturity if
combined with an adverse movement
in interest rates.  Liquidity risk will be
low.  
The counterparty selection criteria
approved above restricts lending only to
high quality counterparties, measured
primarily by credit ratings from Fitch,
Moody’s and Standard and Poor’s.  . 
Corporate bonds will be restricted to
those meeting the base criteria.
Day to day investment dealing with this
criteria will be further strengthened by the
use of additional market intelligence.
£5m and
maximum   
1 year.
£20% and
maximum   
1 year.
Other types of investments
a. Investment properties These are non-service properties
which are being held pending disposal
or for a longer term rental income
stream.  These are highly illiquid
assets with high risk to value (the
potential for property prices to fall or
for rental voids).  
In larger investment portfolios some small
allocation of property based investment
may counterbalance/compliment the
wider cash portfolio.
Property holding will be re-valued
regularly and reported annually with gross
and net rental streams.
£10m 20%.
b. Loans to third parties,
including soft loans
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid.
Each third party loan requires Member
approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default.
£10m and
maximum  
5 years.
10% and
maximum 5
years.
Page 88

Page 89

46 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
c. Shareholdings in a local
authority company
These are service investments which
may exhibit market risk and are likely
to be highly illiquid.
Each equity investment in a local authority
company requires Member approval and
each application will be supported by the
service rational behind the investment
and the likelihood of loss.
50% 20%
d. Non-local authority
shareholdings
These are non-service investments
which may exhibit market risk, be only
considered for longer term investments
and will be likely to be liquid.
Any non-service equity investment will
require separate Member approval and
each application will be supported by the
service rational behind the investment
and the likelihood of loss.
5% 100%
e. Loans to third parties as
part of the Council’s
Empty Homes Strategy
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid. 
Each third party loan requires Section 95
Officer approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default. Each funding request will be
accompanied by financial projections and
be subject to an assessment of the
project and borrower.
£1.5m and a
maximum of
10 years.
N/A
f. Loans to third parties as
part of the Council’s SHF
Front Funding Facility
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid.
Each third party loan requires Section 95
Officer approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default. Each funding request will be
accompanied by financial projections and
be subject to an assessment of the
project and borrower.
£5m and a
maximum of
3 years.
N/A
Page 89

Page 90

47 
Type of Investment Treasury Risks Mitigating Controls Council
Limits
Common
Good
Limits
g. Loans to third parties as
part of the Council’s
Long Term Loan
Funding to RSL’s
These are service investments either
at market rates of interest or below
market rates (soft loans).  These types
of investments may exhibit credit risk
and are likely to be highly illiquid.
Each third party loan requires Section 95
Officer approval and each application is
supported by the service rational behind
the loan and the likelihood of partial or full
default. Each funding request will be
accompanied by financial projections and
be subject to an assessment of the
project and borrower.
£5m and a
maximum of
30 years.
N/A
h. Hub Co sub debt These are non-service investments
which may exhibit market risk, be only
considered for longer term investments
and will be likely to be highly illiquid.
Any non-service equity investment will
require separate Member approval and
each application will be supported by the
service rational behind the investment
and the likelihood of loss.
£10m N/A
i. Investment in a project
run by a Local Authority
or Local Authority Joint
Committee
These are investments which may
exhibit market risks and will only be
considered for medium to longer term
investments
Each investment requires approval by the
Section 95 Officer up to £250,000, and,
above this level, member approval.  Each
application will be supported by the
service rationale behind the investment
and the likelihood of loss.
£10m N/A
Page 90

Page 91

48 
Appendix 6 – Creditworthiness policy
Service and Information provided by Link Group
This Council applies the creditworthiness service provided by Link Treasury Services. This
service employs a sophisticated modelling approach utilising credit ratings from the three
main credit rating agencies - Fitch, Moody’s and Standard and Poor’s. The credit ratings of
counterparties are supplemented with the following overlays:
• Credit watches and credit outlooks from credit rating agencies
• Credit Default Swaps (CDS) spreads to give early warning of likely changes in credit
ratings
• Sovereign ratings to select counterparties from only the most creditworthy countries. 
This modelling approach combines credit rates, credit watches and credit outlooks in a
weighted scoring system which is then combined with an overlay of CDS spreads for which
the end product is a series of colour coded bands which indicate the relative creditworthiness
of counterparties.  These colour codes are used by the Council to determine the suggested
duration of investments.  
Based on the Link Group approach, the Council will therefore use counterparties within the
following durational bands:
Yellow 5 years*
Dark pink 5 years for Ultra short dated bond funds with a credit score
of 1.25
Light pink 5 years for Ultra short dated bond funds with a credit score
of 1.5
Purple 2 years
Blue 1 year (only applies to nationalised or semi nationalised UK
banks)
Orange 1 year
Red 6 months
Green 100 days
No colour Not to be used  
*The yellow colour category is for UK Government debt, or its equivalent, money
market funds and collateralised deposits where the collateral is UK Government debt.
The Link creditworthiness service uses a wider array of information other than just primary ratings.
Furthermore, by using a risk weighted scoring system, it does not give undue preponderance to
just one agency’s ratings. 
Typically, the minimum credit ratings criteria the Council use will be a short-term rating (Fitch or
equivalents) of F1 and a long-term rating of A-. There may be occasions when the counterparty
ratings from one rating agency are marginally lower than these ratings but may still be used.  In
these instances, consideration will be given to the whole range of ratings available, or other topical
market information, to support their use. 
All credit ratings will be monitored at least weekly. The Council is alerted to changes to ratings of
all three agencies through its use of the Link creditworthiness service. 
Page 91

Page 92

49 
• if a downgrade results in the counterparty / investment scheme no longer meeting
the Council’s minimum criteria, its further use as a new investment will be withdrawn
immediately.
• in addition to the use of credit ratings the Council will be advised of information in
movements in Credit Default Swap spreads against the iTraxx European Senior
Financials benchmark and other market data on a daily basis via its Passport
website, provided exclusively to it by Link. Extreme market movements may result
in downgrade of an institution or removal from the Council’s lending list.
Sole reliance will not be placed on the use of this external service.  In addition this Council
will also use market data and market information, information on government support for
banks and the credit ratings of that supporting government. 
No more than £20m can be invested with each UK bank and £15m each with any non UK
bank.  The Council will place overnight and call deposits with the Council’s bankers
irrespective of credit rating.  The Council’s Bankers currently have a credit rating which
allows deposits of up to £20m to be placed with them for up to 100 days.
Deposits can be placed with Local Authorities and other public sector bodies for a period up
to 2 years.
The Council can invest an unlimited amount of money with the Debt Management Agency
Deposit Facility (operated by the Debt Management Office which is part of HM Treasury). 
The longest period for a term deposit with the DMADF is 6 months.
Creditworthiness.
Significant levels of downgrades to Short and Long-Term credit ratings have not materialised
since the crisis in March 2020. In the main, where they did change, any alterations were
limited to Outlooks. However, more recently the UK sovereign debt rating has been placed
on Negative Outlook by the three major rating agencies in the wake of the Truss/Kwarteng
unfunded tax-cuts policy.  Although the Sunak/Hunt government has calmed markets, the
outcome of the rating agency reviews is unknown at present, but it is possible the UK
sovereign debt rating will be downgraded.  Accordingly, when setting minimum sovereign
debt ratings, this Authority will not set a minimum rating for the UK 
CDS prices
Although bank CDS prices, (these are market indicators of credit risk), spiked upwards during
the days of the Truss/Kwarteng government, they have returned to more average levels
since then. However, sentiment can easily shift, so it will remain important to undertake
continual monitoring of all aspects of risk and return in the current circumstances. Link
monitor CDS prices as part of their creditworthiness service to local authorities and the
Authority has access to this information via its Link-provided Passport portal.
Page 92

Page 93

50 
Appendix 7 – Approved Countries for Investments (31-12-23)
This list is based on those countries which have sovereign ratings of AA- or higher (we show the
lowest rating from Fitch, Moody’s and S&P) and also, (except - at the time of writing - for Hong
Kong, Norway and Luxembourg), have banks operating in sterling markets which have credit
ratings of green or above in the Link  credit worthiness service. 
AAA                     
• Australia
• Denmark
• Germany
• Netherlands 
• Norway
• Singapore
• Sweden
• Switzerland 
AA+
• Canada
• Finland
• U.S.A. 
AA
• Abu Dhabi (UAE) 
AA-
• Belgium
• France (downgraded by Fitch on 9th May 2023)
• Qatar  
• U.K. 
Page 93

Page 94

51 
Appendix 8 – Treasury Management Scheme of Delegation 
The Council
• Overall responsibility for Treasury Management Strategy.
• Adoption of Treasury Policy Statements.
• Receive an Annual Report and other reports on the Treasury Management Operation and
on the exercise of delegated treasury management powers.
The Policy and Resources Committee
• Responsibility for the overall investment of money under the control of the Council.
• Keeping under review the level of borrowing.
• Approval of Annual Strategy Statement.
• Receiving and reviewing reports on treasury management policies, practices and
activities.
• Approval of Treasury Policy Statements.
• Implementation and monitoring of Treasury Management Policies and Practices.
The Audit and Scrutiny Committee
• Review the overall internal and management control framework related to the treasury
function.
• Review internal and external audit reports related to treasury management.
• Review provision in the internal and external audit plans to ensure there is adequate audit
coverage of treasury management.
• Monitor progress with implementing recommendations in internal and external audit
reports.
• Reviewing the treasury management policy and procedures and making
recommendations to the responsible body. 
Page 94

Page 95

52 
Appendix 9 – The Treasury Management Role of the Section 95 Officer 
Section 95 Officer:
• Recommending clauses, treasury management policy/practices for approval, reviewing
the same regularly, and monitoring compliance.
• Submitting regular treasury management policy reports.
• Suubmitting budgets and budget variations.
• Receiving and reviewing management information reports.
• Reviewing the performance of the treasury management function.
• Ensuring the adequacy of treasury management resources and skills, and the effective
division of responsibilities within the treasury management function.
• Ensuring the adequacy of internal audit, and liaising with external audit.
• Recommending the appointment of external service providers.
• Reviewing and considering risk management in terms of treasury activities.
• preparation of a capital strategy to include capital expenditure, capital financing, non-financial
investments and treasury management, with a long term timeframe 
• ensuring that the capital strategy is prudent, sustainable, affordable and prudent in the long
term and provides value for money
• ensuring that due diligence has been carried out on all treasury and non-financial investments
and is in accordance with the risk appetite of the authority
• ensure that the authority has appropriate legal powers to undertake expenditure on non-
financial assets and their financing
• ensuring the proportionality of all investments so that the authority does not undertake a level
of investing which exposes the authority to an excessive level of risk compared to its financial
resources
• ensuring that an adequate governance process is in place for the approval, monitoring and
ongoing risk management of all non-financial investments and long term liabilities
• provision to members of a schedule of all non-treasury investments including material
investments in subsidiaries, joint ventures, loans and financial guarantees ensuring that
members are adequately informed and understand the risk exposures taken on by an authority
• ensuring that the authority has adequate expertise, either in house or externally provided, to
carry out the above
• creation of Treasury Management Practices which specifically deal with how non- treasury
investments will be carried out and managed, to include the following: -
o Risk management (TMP1 and schedules), including investment and risk
management criteria for any material non-treasury investment portfolios;  
o Performance measurement and management (TMP2 and schedules), including
methodology and criteria for assessing the performance and success of non-
treasury investments;         
o Decision making, governance and organisation (TMP5 and schedules), including
a statement of the governance requirements for decision making in relation to non-
treasury investments; and arrangements to ensure that appropriate professional
due diligence is carried out to support decision making;  
Page 95

Page 96

53 
o Reporting and management information (TMP6 and schedules), including where
and how often monitoring reports are taken;  
o Training and qualifications (TMP10 and schedules), including how the relevant
knowledge and skills in relation to non-treasury investments will be arranged. 
The nominated Elected Member (Policy Lead for Finance and Commercial Services)
• Acting as spokesperson for treasury management.
• Taking a lead for elected Members in overseeing the operation of the treasury function.
• Review the treasury management policy, strategy and reports.
• Support and challenge the development of treasury management.  
Page 96

Page 97

54 
Appendix 10 – Policy on environmental, social and governance (E.S.G.)
Environmental, social and governance (ESG) investment considerations are about understanding
the ESG risks that an entity is exposed to and evaluating how well it manages these risks. It is not
the same as Socially Responsible Investing, (typically where you apply negative screens), and
equally, it is not the same as Sustainable Investing, (investing in products / companies based on
expected sustainable and beneficial societal impact, alongside a financial return). 
The Council is supportive of the Principles for Responsible Investment (www.unpri.org) and will
seek to bring ESG (environmental, social and governance) factors into the decision-making
process for investments. Within this, the Council is also appreciative of the Statement on ESG in
Credit Risk and Ratings which commits signatories to incorporating ESG into credit ratings and
analysis in a systemic and transparent way. The Council uses ratings from Fitch, Moody’s and
Standard & Poor’s to support its assessment of suitable counterparties. Each of these rating
agencies is a signatory to the ESG in credit risk and ratings statement, which is as follows:  
“We, the undersigned, recognise that environmental, social and governance (ESG) factors
can affect borrowers’ cash flows and the likelihood that they will default on their debt
obligations. ESG factors are therefore important elements in assessing the
creditworthiness of borrowers. For corporates, concerns such as stranded assets linked to
climate change, labour relations challenges or lack of transparency around accounting
practices can cause unexpected losses, expenditure, inefficiencies, litigation, regulatory
pressure and reputational impacts.
At a sovereign level, risks related to, inter alia, natural resource management, public health
standards and corruption can all affect tax revenues, trade balance and foreign investment.
The same is true for local governments and special purpose vehicles issuing project bonds.
Such events can result in bond price volatility and increase the risk of defaults.
In order to more fully address major market and idiosyncratic risk in debt capital markets,
underwriters, credit rating agencies and investors should consider the potential financial
materiality of ESG factors in a strategic and systematic way. Transparency on which ESG
factors are considered, how these are integrated, and the extent to which they are deemed
material in credit assessments will enable better alignment of key stakeholders.
In doing this the stakeholders should recognise that credit ratings reflect exclusively an
assessment of an issuer’s creditworthiness. Credit rating agencies must be allowed to
maintain full independence in determining which criteria may be material to their ratings.
While issuer ESG analysis may be considered an important part of a credit rating, the two
assessments should not be confused or seen as interchangeable.
With this in mind, we share a common vision to enhance systematic and transparent
consideration of ESG factors in the assessment of creditworthiness.”
All the main agencies are now extoling how they incorporate ESG risks alongside more traditional
financial risk metrics when assessing counterparty ratings. As such, their incorporation is already
being done, to an extent, by the use of mainstream rating agencies such as Fitch, Moody’s and
Standard & Poor’s used by the Council. 
Our Treasury Advisors, who are The Link Group, are currently reviewing the market in terms of
providers of ESG metrics and are looking at ways in which this data can be used by the Council.
However, the Treasury Management Code notes that “This is a developing area, and it is not
implied that the organisation’s ESG policy will currently include ESG scoring or other real-time ESG
criteria at individual investment level”. 
The Council will continue to consider ESG factors however, it should be noted that this information
will still be secondary to the requirement for the Council to adhere to the Security, Liquidity and
Page 97

Page 98

55 
Yield requirements of the Treasury Code. Limiting the potential counterparty options could reduce
diversification and increase risk therefore there is an important balance to be had. 
Page 98

Page 99

ARGYLL AND BUTE COUNCIL                           COUNCIL                                                                            
FINANCIAL SERVICES                                           22 FEBRUARY 2024 
ANNUAL ACCOUNTS 2022-23 UPDATE 
1.0 INTRODUCTION 
1.1  The Council’s appointed external auditors for 2022-23 are Mazars. The previous
external auditors were Audit Scotland who had been in place since 2011-12. 
1.2 The audit of the accounts for 2023-24 has still to be completed by Mazars.  Officers
continue to express their dissatisfaction with this situation to both Mazars and to Audit
Scotland and this situation is similar in the two other Scottish Councils being audited
by Mazars.  The lateness of the audit is in no way a reflection on the quality of the
Council’s accounts.   
2. RECOMMENDATION 
2.1 Council to consider and note the contents of this report. 
3. DETAIL 
3.1 The Council had Audit Scotland as their external auditor from financial year 2011-12
through to 2021-22.  The Accounts Commission formally appoint auditors for Local
Authorities and Mazars were appointed last year to undertake our audit from financial
year 2022-23 for a period of five years. .     
3.2 The CIPFA Code of Practice on Local Authority Accounting in the United Kingdom
2022-23 states that a local authority should aim to approve the annual accounts for
signature by 30 September and to publish them by 30th October each year. 
3.3 The audit of the accounts for 2022-23 has still to be completed by Mazars.  Mazars
initially sited difficulties in recruitment as the cause of the delay and resourcing seems
to be an issue across the audit sector particularly public sector.  Audit work would
normally commence in July each year but this was delayed until late September/early
October.  The key audit partner from Mazars has also been absent during January and
at the time of writing it is unclear whether he will be back in February.   
3.4 A special Council meeting has now been in the diary twice, once for December and
again for the end of January, however, both have had to be cancelled.  If the audit
partner does not return to work in February, Mazars will look to assign the audit to
another senior officer within the firm.  It is expected that the substantive work on the
audit and the report will be completed by the end of February.   
Page 99 Agenda Item 7

Page 100

3.5. Throughout the audit there have only been minimal material issues raised by the
auditors with the exception of the treatment of pensions which have now been adjusted
to reflect the asset ceiling calculations as requested by Mazars (a situation affecting all
Local Authorities). The lateness of the audit is in no way a reflection on the quality of
the Council’s draft accounts.   
3.6 In addition to the audit of the Council’s main financial statements there have also been
delays with the following work undertaken by Mazars: 
 Audit of Trust Funds. These are due to be submitted to the charity regulator
OSCR by 31st December however Mazars did not start this audit until January.
An extension request was made to OSCR who agreed to extend until 31st
January however due to the audit partner being absent this deadline will also
not be met and a further extension request has been submitted to OSCR. 
 Audit of Housing Benefit Subsidy claim. This is due to be submitted to the DWP
by 31 January however Mazars did not start this work until mid January
therefore this deadline will not be met. 
 Non-Domestic Rates audit. This is required by the Scottish Government and
has not yet been started. Mazars have contacted the Scottish Government in
relation to this but have not yet had a response. 
3.7 I have advised both Mazars and Audit Scotland of our dissatisfaction with the audit
process this year. I have also been in close communication with another two Local
Authorities who are also being audited by Mazars and they are having the same issues. 
It is expected that after the Audit is complete that there will be a lessons learned debrief
to mitigate an issue like this arising again in the future.   
4. CONCLUSION 
4.1 This report provides Council with an update on the progress with the 2022-23 audit of
the financial statements.   
5. IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – Failure to comply with CIPFA Code of Practice on Local Authority
Accounting in the United Kingdom 2022-23.  Failure to adhere to deadlines from
OSCR, DWP and Scottish Government. 
5.3 Legal – Not expected to be any legal issues. 
5.4 HR – Staff working on the audit usually move from audit work to budget work, however,
since the audit had been delayed further pressure has been placed upon staff. 
5.5 Fairer Duty Scotland: 
5.5.1 Equalities – protected characteristics – None
Page 100

Page 101

5.5.2 Socio-economic Duty – None
5.5.3 Islands – None 
5.6 Climate Change – None 
5.7 Risk – Risk that Accounts are not signed-off before commencement of the 2023-24
accounts. 
5.8 Customer Service - None 
5.9  The Rights of the Child (UNCRC) - None 
Kirsty Flanagan
Executive Director/ Section 95 Officer
5 February 2024 
Policy Lead for Finance and Commercial Services: Councillor Gary Mulvaney                                                  
For further information contact: Anne Blue, Head of Financial Services 
anne.blue@argyll-bute.gov.uk 
Page 101

Page 102

This page is intentionally left blank

Page 103

ARGYLL AND BUTE COUNCIL                                                                             
COUNCIL 
LEGAL AND REGULATORY SUPPORT                                                                                                                       22nd February 2024 
POLITICAL MANAGEMENT ARRANGEMENTS     
1. INTRODUCTION 
1.1 This report invites the Council to give consideration to a vacancy that has
arisen on the Live Argyll Board; and to a request from Glasgow City
Council to appoint a Trustee to the Blindcraft Trust Fund. 
2. RECOMMENDATIONS 
2.1 The Council is asked to give consideration to:- 
1) the current vacancy for an Argyll and Bute Council representative on
the Live Argyll Board; and 
2) the request from Glasgow City Council to appoint a Trustee to the
Blindcraft Trust Fund. 
3. DETAIL   
3.1 Following the Scottish Local Government Elections in May 2022, Argyll
and Bute Council appointed three representatives to the Live Argyll Board. 
One of those representatives, Cllr Ian MacQuire, has advised of his
resignation from the Board with effect from 29th November 2023. The
Council is invited to consider the appointment of a new representative to fill
the resulting vacancy. 
3.2 The Council has received correspondence from Glasgow City Council in
regard to the Blindcraft Trust Fund.  They are inviting the Council to
appoint an ex-officio Council Trustee to the Trust Fund.  The time
commitment for this role is anticipated to be 2 meetings annually.  Further
Page 103 Agenda Item 8

Page 104

information on the appointment and the background to the Trust is
provided at Appendix 1.   
4. CONCLUSION 
4.1 This report asks Council to give consideration to a vacancy on the Live
Argyll Board and the request to appoint an ex officio Council Trustee to the
Blindcraft Trust Fund.   
5. IMPLICATIONS 
5.1 Policy – none      
5.2 Financial – None      
5.3 Legal – None 
5.4 HR – None 
5.5 Fairer Scotland Duty - None 
5.5.1 Equalities - protected characteristics – None 
5.5.2 Socio-Economic Duty - None    
5.5.3 Islands - None    
5.6 Climate Change - None   
5.7 Risk – None 
5.8 Customer Service – None 
5.9 Rights of the Child (UNCRC) - None  
Douglas Hendry 
Executive Director with responsibility for Legal and Regulatory Support   
19th January 2024  
Page 104

Page 105

For further information please contact Shona Barton on 01436 657605 or by email
on shona.barton@argyll-bute.gov.uk     
Appendix 1 – Letter and associated information in relation to Blindcraft Trust
Page 105

Page 106

This page is intentionally left blank

Page 107

Our Ref: PCEDO169/JMM/WS Your Ref:
Date: 12 January 2024
Director of Legal &
Administration
Main Millar
LLB (Hons), Dip LP
Chief Executive’s Office
Glasgow City Council
City Chambers
George Square
Glasgow G2 1 DU
DX GW572
Hand Deliveries to:
40 John Street
GlasgowGl IJL
/11
TO: THE CHIEF EXECUTIVES OF THE BLINDCRAFT TRUST FUND’S PARTICIPATING LOCAL
AUTHORITIES
Dear Sir/Madam
BLINDCRAFT TRUST FUND
I have been instructed to write to you by the Trustees of the Blindcraft Trust Fund to confirm if your local
authority would wish to nominate an ex officio Council Trustee to the Trust Fund.
I attach a paper detailing the background and history of the Blindcraft Trust Fund along with a copy of
the trust deed and copy deed of variation. Your Council is one of those participating local authorities in
terms of the trust deed.
It is anticipated that the time commitment from a Trustee would be two meetings per annum and the
appointment would run on an ex officio basis until the next local government elections.
Please let me know if you require any further information in order to consider this request.
Your sincerely
/éLdf S&744
Jennifer McMartin
Executive Legal Manager
Encs.
Please address correspondence to Wendy Shannon, Governance Project Support Manager, Corporate and Property
Law Section
Direct phone 0141 287 4645/ Mob: 07795 090213
Fax No: 0141 287 8010
E-mail: wendy.shannon@glasgow.gov.uk
www.glasgow.gov.uk
Glasgow - Supporting the Gaelic language Glaschu - a’ toirt talc dhan Ghàidhlig
Glasgow City Council is an equal opportunities employer
Page 107

Page 108

This page is intentionally left blank

Page 109

1 
Background and History of the Blindcraft Trust Fund 
1.  Background 
1.1 The Blindcraft Trust was established in order to carry out the testamentary
wishes of John Leitch by a private Act of Parliament in 1825 which established
an Asylum for the Blind in the City of Glasgow - Act George IV CAD44 (private). 
1.2 The Blind Persons Act 1920 imposed a duty on local authorities to make
arrangements for the promotion of the welfare of blind person’s resident within
their area, a responsibility which was carried out in combination with other
Councils.  Pursuant to this, a scheme was set up by the county councils of Argyll,
Ayr, Dumbarton, Lanark, Renfrew and Stirling and the town councils of the
Burghs of Airdrie, Ayr, Coatbridge, Dumbarton, Falkirk, Glasgow, Greenock,
Hamilton, Johnstone, Kilmarnock, Motherwell and Wishaw, Paisley, Port
Glasgow, Renfrew, Rothesay and Stirling to provide for the housing, education
and training of blind persons.  At a later date the County Council of Bute and the
Town Council of Dumfries also joined the Scheme.  Glasgow City Council
appears to have been the lead authority at that time. 
1.3 In order to facilitate the joint scheme a private Act of Parliament (The South West
of Scotland Blind Asylum Order Confirmation Act 1923) was passed transferring
the Royal Asylum for the Blind from its then managers to the Corporation of the
City of Glasgow which held the property on behalf of all the other Council’s in the
Scheme. 
1.4 The Blind Persons Act 1920 was eventually repealed and the Social Work
(Scotland) Act 1968 imposed a general welfare function on the Councils.  Since
then the Social Work responsibility which includes welfare of the blind, was
transferred to the Regional Councils in the Local Government (Scotland) Act
1973 and then to the unitary authorities in 1994. 
1.5 Since that time various legislation has imposed general welfare obligations on
Councils including welfare of the Blind although this is subject to financial
restraints. 
1.6 Glasgow City Council do not have details of how long the joint scheme ran or
when it was wound up nor do we have any details of how the funds were
administered between 1937 and 1973.  Post 1973 Strathclyde Regional Council
ran workshops for the blind through Social Work Department (known as
“Blindcraft”).  The workshop and the Blindcraft Trust’s funds were administered
by a management committee and it appears that monies were paid out of the
funds either to individuals in the workshops who were blind or visually impaired,
or to the workshop itself.
Page 109

Page 110

Blindcraft Trust – updated November 2023 
2
1.7 At local government re-organisation in 1994 the Management Committee was
discontinued.   
1.8 In 2012 Glasgow City Council applied to the Office of the Scottish Charities
Regulator (OSCR) to obtain charitable status to formalise the arrangements in
relation to the Funds. This application was made as part of a Council wide review
of Sundry Trusts and Funds held by the Council. A list of the historic funds, which
have been transferred into the Blindcraft Charitable Trust, and their original
purposes are attached as part of the Trustee Induction Pack. 
2.  The Blindcraft Trust purposes and participating authorities 
2.1  A copy of the original Blindcraft Trust deed and a summary of the Trust deed are
attached. 
2.2  The charitable purposes of the Blindcraft Trust are:- 
(a)  The prevention or relief of poverty, the advancement of education, the relief
of those in need by reason of age, ill health, disability, financial hardship or
other disadvantage. 
The specific Trust purposes of the Blindcraft Trust as outlined in the Trust Deed
are:- 
(1)  to advance the education of individuals of all ages who are blind or visually
impaired with particular support being given to children from birth to 19 years
of age who have a right to statutory education, declaring that no support
shall be given in respect of any matters for which a local authority has a
statutory duty; 
(2) to relieve poverty amongst individuals who are blind or visually impaired and
in particular unemployed person through the promotion and/or provision of
training and skills of all kinds and particularly such skills as will assist such
residents in obtaining paid employment within the mainstream working
environment, declaring that particular support will be given to the Blindcraft
Factory run by Glasgow City Council for those who are blind or visually
impaired;   
(3)  to promote, establish and/or support other projects and programmes of a
charitable nature for the benefit of individuals who are blind or visually
impaired, including the advancement of the education of the public in general
in relation to individuals who are blind or visually impaired, providing such
other projects are ancillary to the activities carried on by the Trust in pursuit
of the objects (1) and (2) above. 
2.3 The Trust was activated in 2012 as part of a review of the Council’s Sundry Trusts
and Funds carried out by the Council’s Legal and Financial Services
Departments. The Trust is a charitable Trust and therefore must comply with the
requirements of the Office of the Scottish Charities Regulator (OSCR) and Trust
legislation.  The Trustees in this case hold the funds in trust for the purposes set
out in the Trust Deed. 
Page 110

Page 111

Blindcraft Trust – updated November 2023 
3
2.4 The Council areas covered by the Blindcraft Trust are the following: Argyll & Bute
Council, West Dunbartonshire Council, South Lanarkshire Council, North
Lanarkshire Council, South Ayrshire Council, Glasgow City Council, Inverclyde
Council, East Ayrshire Council, Renfrewshire Council, Dumfries and Galloway
Council, Stirling Council and Falkirk Council. Each of these areas will have an
opportunity to nominate a councillor to service as an ex officio Trustee to the
Trust. 
2.5 When the Blindcraft Trust was activated, the Blindcraft Trustees agreed that
certain changes to the Trust deed should be made to comply with Trust
legislation and OSCR Guidance. These changes are included in the Deed of
Variation which is attached as part of the Trustee Induction Pack. 
3.  Financial Position of the Trust 
3.1  The provisional closing balance of the Blindcraft Trust Fund as at 13th October
2023 is £196,116. 
3.2 The Blindcraft funds are currently held as part of the Council’s Sundry Trusts and
Funds portfolio. The Council’s Sundry Trusts and Funds portfolio is managed by
Ruffer Limited Liability Partnership, an investment management firm, appointed
by the Council.  The investment objectives of the Fund is to preserve the capital
over rolling 12 month periods, and secondly to grow the portfolio at a higher rate
(after fees) than could reasonably be expected from depositing the cash in a UK
bank.  The Fund is invested in a variety of different asset classes, including fixed
interest stocks and equities (both UK and international), and an allocation of
other risk investments designed to improve the overall return, but never to the
extent of risking serious capital loss. 
3.3 The Council’s Financial Services department prepares the Blindcraft Annual
Accounts, which are approved by the Trustees at the Blindcraft Annual General
Meeting and thereafter sent to OSCR.   
4. Administration of the Blindcraft Trust 
The Blindcraft Trustees have agreed the following: 
4.1  Meeting frequency: Twice per annum. Meetings take place in spring and in
winter. 
4.2  Spending restrictions: There are no spending restrictions in the Trust Deed
however the Trustees have agreed to limit grant expenditure to a pre-determined
amount which is reviewed annually. 
4.3  Trust Meetings and Award Process: 
Trustees will approve the Trust accounts prepared by the Council’s Financial
Services Department and audit report prepared by external auditors. 
Trustees also agree the level of Trust expenditure for that particular financial year
and confirm the organisations they wish to invite to make an application to the
Trust. It is recommended that one of these organisations is RSBi in order to
comply with the terms of the Trust Deed. 
Page 111

Page 112

Blindcraft Trust – updated November 2023 
4
The Trustees may wish to give the organisations an idea of the type of projects
which the Trustees would like to consider. 
The Trustees receive an update from the Council’s Customer & Business
Services as to the status of the applications made in the previous year. 
A small number of suitable organisations previously invited by the Trustees put
forward suggested proposals to the Trustees which would fit in with the Trust
purposes. The Council’s Financial Services Departments (Corporate Finance
and CBS) will have carried out financial and governance checks on these
organisations and will report their findings to the Trustees. The Trustees then
give consideration as to whether to award a grant to the organisations, to what
value and over what period.   
The values of grants from the Trust are currently agreed by the Trustees as the
following: 
Large grant - over £50,000 
Medium grant - between £5000 and £50,000 
Small grant - up to £5,000 
If the Trustees wish to fund any of the proposals put forward by the organisation,
the Trustees will then authorise the Council’s Financial Services Department
(CBS) to put in place monitoring arrangements to monitor the use of the
donations. 
Page 112

Page 113

ARGYLL AND BUTE COUNCIL       COUNCIL
LEGAL AND REGULATORY SUPPORT        22 FEBRUARY 2024 
APPOINTMENT OF INDEPENDENT AUDIT AND SCRUTINY CHAIRPERSON 
1.0 INTRODUCTION 
1.1 This report outlines the process that has been undertaken in terms of the
appointment of an Independent Chairperson for the Audit and Scrutiny
Committee and seeks agreement of Council to appoint Ms Janice Wason Hall to
that position. 
1.0 RECOMMENDATIONS 
2.1 Council is asked to agree the appointment of Ms Janice Wason Hall to the post
of Independent Chairperson of the Audit and Scrutiny Committee for an initial
period of 2 years until 21 February 2026. 
2.0 DETAIL 
3.1 The Council agreed at the meeting held on 19 May 2022 that work would be
undertaken in terms of recruiting a new Chairperson for the Audit and Scrutiny
Committee following notification that Martin Caldwell, the current Chairperson,
had indicated his intention to step down from the post. 
3.2 A delegation was given to the Executive Leadership Team in consultation with the
Leader of the Council, the Depute Leader and the Leader of the largest opposition
group to take forward the recruitment process.
3.3 A recruitment exercise was undertaken initially via My Job Scotland which did not
result in any suitable candidates.  Following this another recruitment exercise was
undertaken which resulted in one candidate being identified.  Interview of the
candidate took place on Wednesday 31st October at the Council Headquarters,
Kilmory Castle.
Page 113 Agenda Item 9

Page 114

3.4 Ms Janice Wason Hall is a business owner on Mull and has significant experience
of working at a high level in the public sector.  The recruitment Panel were
unanimous in their view that Ms Hall was a suitable candidate and agreed to
recommend her appointment to Council for an initial period of 2 years.
3.5 Council should note that the current Chair, Martin Caldwell, has agreed to
undertake a mentoring role for Ms Hall and this will be taken forward over the
March and June meetings of the Committee. 
4.0 CONCLUSION
4.1 Following the decision of Council in May 2022, recruitment for a replacement
Chairperson for the Audit and Scrutiny Committee was undertaken.  Council is
asked to approve the appointment of Ms Janice Wason Hall as Chairperson of
the Audit and Scrutiny Committee for an initial period of 2 years. 
5.0 IMPLICATIONS
5.1 Policy – in line with the Council Constitution and continues the Independent
Chairperson role on the Committee.
5.2 Financial – there will be costs incurred in terms of provision of ICT equipment
and any relevant expenses.
5.3  Legal - none
5.4  HR – relevant policies will be applied.
5.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics - none 
6.5.2   Socio-economic Duty - none 
6.5.3  Islands - none
5.6 Climate Change – none 
5.7 Risk – deals with the risk of not having an Independent Chairperson
5.8  Customer Service - none
5.9 The Rights of the Child (UNCRC) - none
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support
Policy Lead Councillor Robin Currie
31 January 2024                                                 
For further information contact: 
Shona Barton, Governance Manager (01436) 657605
APPENDICES - none 
Page 114

Page 115

1 
ARGYLL AND BUTE COUNCIL  COUNCIL
EXECTIVE DIRECTOR WITH
RESPONSIBILITY FOR LEGAL AND
REGULATORY SUPPORT 
22ND FEBRUARY 2024 
DEMOCRACY MATTERS 2 – DRAFT CONSULTATION RESPONSE 
1.0 HEADLINES 
1.1 This report provides Members with a proposed response to the Democracy
Matters 2 (DM2) consultation, for their consideration and comment (attached at
appendix 1).     
2.0 RECOMMENDATIONS 
Members are asked to:- 
2.1 Consider the proposed DM2 consultation response; and 
2.2 Agree that the draft response is submitted to the Scottish Government by
the 28th February 2024 deadline. 
3.0 DETAIL 
3.1 The Local Governance Review was jointly launched in December 2017 by the
Scottish Government (SG) and COSLA, consisting of two strands:- 
1) Community level decision making and
2) Public service governance 
3.2 Strand 1 focused on communities and was entitled Democracy Matters.  A phase
1 consultation was held between May and December 2018, which invited views
from communities on their experiences of getting involved in local decision
making, whether they would like more control over some decisions/any service
areas, what local means to them, and what structures/processes could allow for
more power to be exercised by communities. Phase 1 attracted input from circa
4000 respondents. 
3.3 The Council undertook a programme of engagement to inform a response to the
consultation, which included 10 ‘Big Listen’ events across Argyll and Bute plus an
online webchat. The formal response to Phase 1 was approved by Council on 29th
November 2018 and can be accessed here. 
3.4 Phase 2 of the Democracy Matters conversation was launched by SG and
COSLA on 28th August 2023, with responses invited by 28th February 2024. 
Phase 2 is about asking communities to get together to consider a series of
scenarios and questions, based on the 6 key findings from phase 1, which are
Page 115 Agenda Item 10

Page 116

2 
summarised below:- 
1) Powers – respondents said they wanted to see a real shift in power in
favour of communities.  This should provide autonomy to make
improvements and reimagine how a range of public services work in their
area.
2) Representation - respondents said they value representative democracy
but also want to see a more diverse set of people in decision making roles.
3) Accountability and participation - respondents said that decision makers
must involve the community and be accountable to them for the difference
made with the total resource available.
4) Setting local boundaries and priorities - respondents said that setting
boundaries and setting priorities are interrelated and that communities
should be helped to decide these for themselves.
5) Standards, resources and relationships - respondents said that new
arrangements must be resourced, integrated with existing democratic
decision making structures, and take account of everyone’s needs.
6) Nurturing community capacities - respondents said communities should be
able to move at their own pace, and that they will need tailored support. 
3.5 The Council has promoted the consultation to Community Councils (CCs) and
other community groups, to support the focus on communities hosting local
conversations to assist in formulating their responses.  Information events, hosted
by the Improvement Service specifically for CCs, have also been promoted, as
well as details of the SG Democracy Matters Fund, which has been set up to
provide up to £300 expenses support to any organisation/group organising a local
event. 
3.6 A draft response has been prepared by the Council and is attached at appendix
1 for consideration.  To assist in the formulation of our response, a Members
Seminar was held on 29th November 2023 to brief Councillors on the consultation
and to invite feedback and comments on the proposals.  The key points arising
from this session have been incorporated into the response under the relevant
questions, including:- 
• Why re-invent the wheel? Importance of investing in the current important
democratic processes and structures which are deemed to be fit for
purpose from our perspective;
• No clear rationale or evidence to support the creation of a further tier of
governance, which has the potential to clutter the landscape and result in
further resource and financial pressures;
• The consultation proposals assume that all groups wish to be represented
and want to come together to participate in local decision making.
Experience in Argyll and Bute illustrates that current levels of engagement
and participation can vary considerably across different communities.  For
example a large number of CCs are formed by nominations as there are
not enough candidates to formally elect or, in some cases, are not able to
be formed at all due to a lack of participation.
• How do you define a community? There will be major differences across
across Scotland in terms of what this could mean and will depend on the
demographic of the area, with notable variances across urban/semi
rural/rural area.  In Argyll and Bute there is the possibility of identifying
Page 116

Page 117

3 
literally hundreds of communities.
• The proposals are not clear on whether local groups/volunteers will be
remunerated for their role in any new decision making body – clarity has
been sought on what is envisaged here. 
3.7 Members are asked to approve the draft response and agree that Officers submit
it to the Scottish Government by the 28th February 2024 deadline. 
4.0 CONCLUSION 
4.1 Phase 2 of the Democracy Matters conversation was launched in August 2023,
following on from the initial phase undertaken in 2018.  Details of the consultation
has been promoted to our communities via CCs and other local groups and
organisations.  The Council’s proposed response is attached at appendix 1 for
Members consideration. 
5.0 IMPLICATIONS 
5.1    Policy – none at present but potential for significant implications due to
emerging national reform  
5.2    Financial – none at present but potential for additional cost pressures,
depending on outcome of emerging reforms 
5.3    Legal – none at present but potential for new legislative requirements  
5.4    HR – none at present but potential requirement for additional resource
to support implementation 
5.5    Fairer Scotland Duty – none  
5.5.1 Equalities – Protected Characteristics - none 
5.5.2 Socio Economic Duty - none 
5.5.3 Islands - none 
5.6    Climate Change - none
5.7   Risk – failure to influence the national development of public sector
reform 
5.7    Customer Service – none
5.8    The Rights of the Child (UNCRC) - none 
6.0 APPENDICES 
6.1 Appendix 1 – draft DM2 response 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
23rd January 2024                                                  
Page 117

Page 118

This page is intentionally left blank

Page 119

OFFICIAL - SENSITIVE 
1
Democracy Matters 2 
Consultation Questions 
1. How could your community use these types of powers to achieve its
ambitions, now and into the future? 
It is the view of Argyll and Bute Council that the structures which are currently in place are
deemed fit for purpose in terms of meeting identified need and we do not support the
proposals set out within the consultation document.  The Council recognise value in
supporting and investing in the current arrangements and have significant concerns about
the level of additional resource that would be required to implement what is being
suggested here.  Our concerns are further compounded by the timing of these proposals,
which coincide with a number of other significant public sector reforms and
financial/resource constraints.  Please refer to Q16 which picks up on these points further. 
The powers are outlined as general, specific, direction of associated budgets, employment
and community collaboration. The consultation does not outline how it would build on
current facilitators such as community planning, community empowerment, Planning with
People and co-production through the national standards of engagement.   
The consultation is unclear on the framework of developing citizen participation in the
democratic process, the source and availability of resource and the development of a co-
productive relationship in service development outwith current structures, legislative
requirements and guidance. It is further unclear how this relates to stimulating the third
sector who have developed on the basis of local need, community councils, social
enterprise and community interest companies. 
It is also not clear how this aligns with or is intended to complement the Scottish
Government’s Scottish Approach to Service Design, which sets out a new model of
designing services with, as opposed to, for communities and service users. Expanding the
use of this as a public service design tool will have a positive impact on supporting better
decision making with rather than for communities.
Page 119

Page 120

OFFICIAL - SENSITIVE 
2
2. What other powers should be added, and are there some which should be
retained by existing decision-makers? 
The Council would like to reiterate its concerns about the proposals being consulted on
and, again, would promote a focus and investment in current structures that are operating
well.  For example, by continuing to develop approaches to Community Wealth Building
to support local inclusive economies by focusing on key areas such as:- fair employment;
progressive procurement; plural ownership of the economy; financial power; and use of
land and assets,  in conjunction with other models such as the Scottish Government’s
Scottish Approach to Service Design. 
The consultation document notes out of hours health care as an option for specific
powers.  Health and Social care services are delegated to IJBs which have structures within
the legislation and guidance governing their relationship with communities around
regulated services. Some further exploration in powers relating to regulated services that
don’t take into account professional advisory and available funding at a national level for
health service (NRAC). There is the potential to create greater health inequalities where
you may have a small and unrepresentative number of decision makers and a changing
demographic. For example co-production within current structures allows for the
development of on island out of hours health care involving as far as possible the whole
community and its representatives. The exercise also co-opts planning, transport
infrastructure, social care and clinical expertise which takes a long term whole system
approach and considers need across the lifespan and where other resource can be
capitalised with wider partners. Planning can in effect be undertaken and resource
directed with a shared approach to power, within regulation and with a future focus. 
Providing community groups with the power to employ staff presents significant
challenges where this is to be applied to a resource or service currently operated by the
Council. An example of this may be in recycling. Any transfer of resource from the Council
to a community group would include by necessity the transfer of staff under TUPE. This
would mean that the community group would have to be able to provide all of the
employer resources currently provided by the council – pension, employee assistance, sick
pay entitlement etc and at the same salary level. The economies of scale mean that the
Council is better placed to retain staff employment therefore this power should be
retained by the existing decision maker – ie the Council. 
Page 120

Page 121

OFFICIAL - SENSITIVE 
3
3. When thinking about who might be part of new decision-making bodies, what
are the best ways to ensure they truly reflect their communities and enhance
equality? 
The Council are opposed to the notion of introducing new decision making bodies and there are a
number of factors that require to be considered in this regard including: 
• Consideration should be given to the structures that are already in place and how any future
structures would sit alongside those which are required and advised through guidance. 
Argyll and Bute Council has 36 elected members, representing constituents across 11 multi
member wards.  There are a wide range of efficient governance arrangements in place at
both a council, HSCP and wider community level to support the area, including:- 4
decentralised Area Committees with delegated authority to make decisions affecting local
communities; 4 Area Community Planning Groups – an unincorporated partnership of
agencies and organisations drawn from public/private/third sector, community
organisations and partnerships; 4 HSCP Locality Planning Groups – bringing together NHS
and Council staff, community members, carers, representatives from third and independent
sectors, and community based groups; 56 community councils; and a whole raft of other
community organisations and trusts.   Adding a further layer of governance presents a real
risk of cluttering the landscape and increasing the potential for local conflict and
polarisation.
• Potential difficulties around engagement from communities could be a barrier to ensuring
appropriate representation.  For example, in Argyll and Bute we currently have 54 out of a
possible 56 community councils established.  After an initial round of elections we had 39
CCs from 56 formed (38 uncontested and one contest). We had a further 15 formed after a
second electoral process (none contested); and one further CC formed after a third round
of elections.  Two community councils remain dormant as we were unable to get enough
of the community to come forward to be in a position to formally establish the community
councils for those areas. 
• The definition of community in terms of this question is key – does this mean a geographic
area (small or large) or does this mean something else?  There will be major differences
across Scotland in terms of what this could mean and will depend on the demographic of
the area, with notable differences across urban/semi-rural/rural areas. 
• Ensure that the current, and projected future, demographic make-up of the community is
understood.
• Ensure that representation on any new decision making body fully reflects the equalities
profile of the area, including those people who are harder to reach.
• Ensure that all those invited/appointed to represent have the skills (or are appropriately
supported), to have the skills to work collaboratively with others. Some under-represented
individuals do not want to participate as they feel disempowered as a single representative
and prefer to engage in the 'safety' of their particular characteristic (i.e. age, gender). This
requires support and skills of paid workers to support these challenges and enhance
equality.   
Page 121

Page 122

OFFICIAL - SENSITIVE 
4
4. Thinking about your own community, what groups would you like to see
represented through other selection methods, and what should these methods be? 
As per question 3 above. 
This question assumes that groups would want to be represented, however we know
from working with equalities groups that representatives can experience
disempowerment when they are the single representative voice in the room. It is more
important that rather than ‘select’ people, that there is a requirement to link with local
or national bodies that represent experiences of different equalities groups. 
There has to be a recognition of the demographic of a particular area and also that the
representation on any new body reflects the remit which has been set for that body. 
Once there is clarity on the remit and decision making powers then it will be clearer in
terms of who might wish to become involved.   
It is important that representatives are able to be a voice for all in the “community”
and not just for their specific group. In terms of mechanisms for selection, this would
need to be open and transparent and widely advertised.  There should be identification
of best practice used in previous recruitment exercises. 
All those selected to represent should be required to be accountable to the community
they represent, to demonstrate that they are representing all views and to be open
and available to feed back to the wider community and accountable for their decisions. 
Page 122

Page 123

OFFICIAL - SENSITIVE 
5
5. What would the role of local elected representatives be, and what would
incentivise other people to take on/be part of decision-making? 
Firstly, it is unclear from this question if this relates to Elected Councillors or includes
Community Councillors who could also be identified as local elected representatives.  The
Local Councillor, who is elected by the community and has a democratic mandate to
represent the views of their constituents, should be involved in any future decision-
making bodies. 
An obvious difference is that elected members are remunerated, whereas community
councillors are not.  In terms of possible incentives, is there a suggestion that
remuneration would be offered to any new local decision body? Clarity on this would be
helpful. 
As per previous views expressed in this consultation response, it is deemed important to
invest in the current structures, including our elected members.  Councillors are the
democratic elected representatives of the local areas and there is merit in strengthening
their role.  There is also perhaps an opportunity to enhance communities understanding
of the role of elected members and promote/encourage community members to put
themselves forward for election and invest in the current democracy. Councillor
remuneration is one area that is cited as a barrier to recruitment, and on this basis the
Scottish Government and COSLA have committed to undertaking an independent review
to ensure that moving forward the terms and conditions for councillors truly reflect their
responsibilities. 
It is not deemed feasible to consider giving more powers to other local decision making
bodies if local elected councils do not have parity of esteem with other elected bodies in
Scotland.   
Encouraging other people to take on or be part of the decision-making process may prove
to be difficult depending on the arrangements in place for the body.  If the new body has
a general remit without a focus or specific purpose, then it would be more difficult to
engage others in the process.  Taking for example the work around the formation of the
IJB, this has a clear remit and therefore those who applied to be part of this decision-
making body were aware of what the remit and purpose was. 
Page 123

Page 124

OFFICIAL - SENSITIVE 
6
6. What do you think are the best ways to ensure new decision-making bodies
are accountable to their community? 
Proposals are such that the new community decision-making bodies are suggested as being half
directly elected and half selected by different methods, and that they should be autonomous.  
Accountability for those elected, such as local councillors and community councillors, will be via their
individual Code of Conducts and in addition, there are fixed terms which give the community the
opportunity to voice any concerns they have about how they are represented at the ballot box.  Elected
members also have a range of support frameworks in place to enable them to fulfil their roles and
ensure good governance.  A similar set up would be required for any other local decision making body
put in place, including any inspection and audit requirements.  While it is seen as desirable to have a
more diverse set of decision makers than the range of diversity that might be returned though those
elected positions, as a minimum there must be a similar standard of enforceable principles to adhere
to that would apply to those selected by alternative methods.    
We would also make the point that elected roles are the most democratically accountable for the
reasons set out above.  Therefore, it may be preferable to undertake targeted campaigning to those
underrepresented groups, to encourage them to stand for election to a relevant community body. 
Clearly defined roles and responsibilities and terms of reference for each group will help with
attracting people to those positions.  That may be simpler where there is a group formed to respond
to a single issue, or a series of interrelated issues, less so if proposals are to form one representative
body for an indefinite period whose role might be to look at all community issues.   The consultation
is vague regarding the definition of “community.”  
Transparency of decision making will be crucial in terms of accountability. Public meetings in the truest
sense should be a requirement for community bodies so that the community have the right to actively
participate in discussions, or at very least attend a meeting to understand why certain decisions are
being progressed on their behalf.  However, public meetings cannot be the only method of
engagement as it should not be the case that those who are most vocal about an issue are perceived
to be the representative view to the detriment of what may be a silent majority.  
Whatever model might be introduced in terms of local decision making, the vessel tasked with this
must have a clearly defined procedures which set the purpose, parameters within which it will operate,
membership (including how members of the community body are selected) and they must have the
access to training and tools to allow them to actively demonstrate that they are listening and engaging
with the communities represented.   
The level of accountability is dependent on the level of ask.  For example, existing public bodies
operate within a statutory framework and when it comes to delivering services, there are a whole
range of regulations to comply with.  It is our view than any new community decision making body,
who is charged with taking on the delivery of a service in the same manner as another public body,
such as a local authority or NHS, should be subject to the same level of accountability.   It is difficult to
comprehend how a relatively loose/unincorporated community could be held to the same standards. 
Is there an acceptance of this by the Scottish Government?  It would be useful to understand the type
of democratic framework envisaged here. 
Page 124

Page 125

OFFICIAL - SENSITIVE 
7
7. Are community events a good way to involve local people in scrutinising
progress and setting future direction? 
We are of the view that community events are not the most effective means of providing
relevant scrutiny and setting future direction. This assumes that everyone identifies as a
'community' and has the capacity and capability to attend events. Events have limited
attendance and although there is always a feel good factor to events they do not meet
equalities or exclusion. Engagement through a range of means to ensure diversity of
thoughts and scrutiny and over a min of 3 months is needed to do this well. 
It is our view that a better approach would be to seek advice from audit bodies such as
Audit Scotland, Education Scotland, who are experienced in scrutinising spend of public
money on outcomes – including processes of organisations and their ability to engage. 
One of the challenges in setting future direction will be access to and willingness to be
informed by data that highlights needs. Public bodies are driven by legislation and by needs
assessments when designing services. Communities may be influenced more by desires
than needs unless the data and analysis showing need is made available. 
The decision making bodies will need to set goals and show their work towards these by
measuring progress. They will need to keep clear financial accounts and have this looked
over by an independent accountancy body. They will need to publish their accounts and
have AGMs so that people can ask questions. 
They will need to have ways that people in communities can contact them and routes for
people to make complaints. 
Page 125

Page 126

OFFICIAL - SENSITIVE 
8
8. What other mechanisms would help achieve high levels of community
participation in local decision-making processes? 
Investment in the understanding of democracy through formal and informal training
programmes, school subjects and better 'routes to become an elected member'
apprenticeship programmes to encourage this as a valued career path. Increasing the
knowledge, understanding and participation in the current system will enable better
participation in decision making.   
As mentioned in Q5 above, the independent review of Councillor Remuneration, which is
one area that is cited as a barrier to recruitment, may assist in ensuring that moving
forward the terms and conditions for councillors truly reflect their responsibilities, and
encourage others to consider this role in local decision making. 
It should be recognised as part of this consultation that many people do not have capacity
to participate in decision making due to time with work and caring responsibilities and
trust those who they locally elect to do so. There is also a need for investment in trusted
online platforms and apps to enable full, safe, inclusive digital engagement. The work
being carried out by Audit Scotland on Digital Exclusion and due for publication in 2024
will inform particular consideration of this. The answers to this question are best found by
asking - why do people not participate now? And building solutions through the answers
to this.
Page 126

Page 127

OFFICIAL - SENSITIVE 
9
9. What else should this process include to provide new community decision-
making bodies with a strong locally agreed mandate? 
Argyll and Bute Council are not in support of the proposals being consulted on, however
in terms of good practice  we would suggest that the following is included within any
locally agreed action plan should a decision be taken to implement:-
• Budget - overall and for individual outcomes / areas of work; 
• Vision and timescales; 
• Risk appetite and how much community is willing to lose by 'trying something'
new;
• Impacts the plans will have on - jobs, people, environment etc…
• Clear agreement on employment status and the implications of being an
employer. 
• Communities receiving public and third sector support to develop a multi-year
community action plan -  this is a laudable aspiration and new resources, including
multi year budgets, will be required to provide the desired level of support.
• Community action plans including a suite of powers to achieve their community
vision – we are of the view that guidance will be required on what these powers
are and how they can be accessed.  
• With regards to using a process similar to Community Right to Buy to test whether
people wanted to establish new decision making bodies, this will require the
establishment of ballots which will require extensive guidance and resource and
will need to be included as part of this endeavour. 
• Argyll and Bute Council are currently in the start-up stage of a new initiative to
develop area plans for all our areas reflecting investment opportunities and local
service prioritisation.  These will include natural and publicly recognised
boundaries and will be a participative process.  The plans will;
o Capture community vision and aspirations for each area.
o Reflect investment opportunities. 
o Identify local projects. 
o Whilst this process will not guarantee the provision of funding towards
projects agreed within the plan, it will be orientated towards maximising
external funding.
• The outcome of this process will be a locally agreed mandate.
• It would seem sensible for any new community decision making body to work
closely with the Council and other local partners in the development of local
action plans to ensure a joined up approach and to eradicate any duplication of
effort. 
Page 127

Page 128

OFFICIAL - SENSITIVE 
10 
10. Are there ways to ensure new bodies are still wanted – for example by making
them time-bound and subject to renewal ballots? 
11. How do you think community decision-making bodies should be resourced? 
Yes, it is our view that all new bodies should be time bound. For example, it could be
recommended that an upper limit of 5 years is applied for elected positions, in line with
current electoral cycles and the national standards/legislation for the delivery of an
elective process. 
It is also worth considering what the back up plan/safety net should be, in the event that
any new community decision body fails to deliver on their agreed mandate.
Adding in this additional tier of governance will be at a cost and this would need to be
adequately resourced.  Dependent on the remit of any new decision-making body and if
there are budgetary decisions to be taken then there could be implications in terms of
ensuring good governance and this, again, would incur extra costs. Making use of existing
structures could offer a way to offer options for more community based decision-making
but there would still be an additional resource implication, which would require to be
funded centrally by the Scottish Government. Over and above the direct funding
approach, another type of funding for any new community decision making body that
requires to be given consideration to is seed funding. 
Some good work has already been done in terms of the utilisation of participatory
budgeting models, which involves the community in decision making, has budgetary
powers and can in some cases be at little additional cost. 
However they are resourced, there will need to be 'extra' money from somewhere as it
will take an injection of funds to get them set up and in place. Why would they have light
touch regulation when the examples show that they may take on services that are heavily
regulated by public bodies? A supportive step in this for bodies such as councils would be
to have lighter regulation now so as to ease pressures on constant reporting and enable
more resource on service delivery. 
We would query how this can be applicable to a whole system approach as identified by
Argyll & Bute if the responsibility lands with local government to discharge – perception
will remain local government. Likely requirement to need skilled capacity to discharge
and address relevant governance. 
The consultation document notes local fund raising which does not take account of the
impact of the cost of living crisis and fuel poverty within a remote and rural area. This
may be more easily facilitated in a highly populated area but there is limited economic
potential where the financial challenge is already being felt.  
Page 128

Page 129

OFFICIAL - SENSITIVE 
11 
12. Are these the right set of standards to provide reassurance that new
community decision-making bodies will be effective and treat everyone with dignity
and respect? 
The most logical way forward would be for the members of any new community decision-
making bodies to be subject to the existing ethical standards framework – namely the
Ethical Standards in Public Life etc. (Scotland) Act 2000, and in particular, the Model Code
of Conduct for Members of Devolved Public Bodies. This would hold the members of any
new bodies to the same standards of conduct as are expected by councillors, and members
of other public bodies. It would also mean that any alleged breaches of the Code would be
subject to independent investigation by the Ethical Standards Commissioner, and
adjudication by the Standards Commission for Scotland (with the legal powers to impose
sanctions should a breach be established). 
It necessarily follows that members of any new community decision-making bodies should
be subject to the same standards of conduct of those operating in similar public bodies. 
Please refer to the points raised in Q6 in respect of accountability, which are also relevant
here.
Page 129

Page 130

OFFICIAL - SENSITIVE 
12 
13. How could a charter be designed to best ensure a positive relationship
between community decision-makers and their partners in national and local
government and the wider public sector? 
A Charter should set out the principles in which any new community decision making body
would operates, but a Constitution (including a Scheme of Delegation and/or Standing
Orders, where appropriate) may assist those bodies in carrying out their regular functions
and recognising the scope/extent of their powers. 
Such a Charter would have to clearly set out the limits of the decision-making powers that
a new community decision-making body shall have, and the matters that are retained by
existing partners, which the new body will require to collaborate with them in relation to.
Any links to existing legislation/frameworks should therefore be made clear within the
Charter. 
To have a positive relationship, each body needs to have an understanding of what is
expected of the other – in terms of both activity, outcome and behaviour. A process also
needs to be set out in the Charter which states regularity of meetings and
routes/mechanisms to resolve disputes - much like a service level agreement. However it
would not be the Charter itself that ensures behaviour and positively, this will be based
on the personalities and conduct of those involved. Therefore it would be very important
for all members of bodies subject to the Charter to also be signed up to/have completed
something like co-production training. This better enables a positive culture of working
together where all are equally informed, and have a baseline skill level, of behaviours and
ways of working. 
It may be that the new body requires support from professional services in the Council
(see Q2 above). A charter or service level agreement or contract could set out what
would be provided and what the resourcing terms of that agreement are. The level of
this support would be dependent on the aims, objectives and scale of the body’s
ambitions and activities. 
It should be noted that Argyll and Bute Council already have adequate measures in place
with community groups in respect of service delivery, for example via the use of Service
Level Agreements and it is unclear what value a charter would add.  This approach is
continually adopted to ensure that the voting public are clear on what is being delivered
by the local authority/others.  For example, during the COVID-19 pandemic, in an
environment when arrangements had to be progressed quickly, the Council were able to
formalise arrangements and ensure a positive working relationship with our
communities. 
Page 130

Page 131

OFFICIAL - SENSITIVE 
13 
14. What types of support might communities need to build capacity, and how
could this change the role of councils and public sector organisations? 
It would be helpful to understand the scrutiny/evidence that exists which has identified
the perceived gaps in ability to participate beyond current national guidance – is the
requirement ad hoc? Do urban areas fair differently from rural and island communities?
Do we need to tailor the approach/charter to acknowledge current activity? What are
the impacts on delegated services and the requirement for professional advisory for safe
services? 
Building on the narrative provided in response to Q3 and Q4, different communities will
require varying degrees of support and assistance in building capacity to enable any new
tier of governance to operate well, if at all.  As previously mentioned, some communities
are very active and engage effectively, however there are others with a distinct lack of
participation.  This could lead to issues of inequality across different communities within
Argyll and Bute – for example those communities that are better equipped will be able to
leverage advantage from any new tier of local democracy, more than those that are less
engaged/capable of doing so for whatever reasons (e.g. deprivation). 
In order to address such issues, there will need to be significant resources/ funding to put
in place capacity development support for any new community decision making bodies,
and to aid the process for creating them in the first place, with focus being placed on those
communities that may require additional assistance.  In line with the response to Q15
below, extra community development staff and co-production monies will be essential. 
The Council envisage a number of risks arising from the proposals as they stand, including:-
• Possibility that Councils will lose economies of scale and see other costs rise as a
result;
• Additionally, there is a real risk that the Councils ability to respond to emergency
situations would be adversely impacted.
• The proposals set out a role for Councils in terms of acting as mediators in
community disagreements.  Previous experience/cases of such disputes show that
they require a huge amount of time to resolve.  Councils are not suitably resourced
to take on such additional duties. 
Page 131

Page 132

OFFICIAL - SENSITIVE 
14 
15. Are there specific additional powers and resources which would help public
sector organisations to work effectively in partnership with new community decision-
making bodies? 
Rather than “powers” in addition to current structures, the focus could be on enablement
within the current legislation, guidance and structures and better use of key community
assets and plans supported by a place based approach. This may also be more economically
viable and sustainable.  Community resilience planning could play a wider role here for
remote and rural expanding physical resilience with ongoing community led capacity
building and maximisation of current channels of effective two way communication. 
Clarity about the different roles of the various bodies is an essential precursor to effective
partnership working. This should set out clearly what the roles of each of these bodies -
Local Government, Community Councils, Community Planning and the new bodies are.
This must make it clear who is responsible for delivering what and how the bodies are
expected to relate to and complement one another. This clarity will foster clear
understanding and mutual respect which will facilitate effective partnership working. 
If these proposals are to be adopted moving forward, there will be an additional
resource/budget pressure on local authorities to support any new community decision
making bodies in terms of training, navigating their new roles etc, therefore there is a need
for more community development resource to support this extra work.  In addition there
will be a requirement for additional co-production monies to support the new roles. 
The consultation documentation suggests that some of the principles of this piece of work
is to (a) simplify the current arrangements, a notion that we dispute and would argue that
the opposite is in fact true, and (b) to provide parity of approach across all public sector
bodies, including any new community decision making bodies.  If the latter is a vision then
this is to be welcomed.  However we would question what this means in terms of ensuring
bodies are suitably accountable and are reporting to an appropriate standard – for
example via inspections, audits and the wide range of other regulatory requirements that
local authorities and others are currently subject to.  Further information and clarity is
sought in this regard. 
Page 132

Page 133

OFFICIAL - SENSITIVE 
15 
16. Thank you for considering these questions. When sending us your views,
please also tell us about anything else you think is important for us to know at this
stage. 
Respondent Information Form 
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/ 
Please tell us who’s views you represent: 
My own 
My organisation’s 
My community conversation’s 
Full name or organisation’s name 
Phone number 
As mentioned throughout this consultation response, Argyll and Bute Council are opposed
to the proposals as set out.  They come at a time when there are a number of other
significant programmes of public sector reform being progressed, such as the other
strands of Local Governance Review (LGR) and the National Care Service (Scotland) Bill,
both of which involve a review and potential changes to the powers of existing decision
makers. With regard to the former it is understood that the COSLA position is that all
elements of the LGR should be pursued in parallel, however this would not appear to be
the case, with progress in other areas falling behind. 
We also have concerns about how financially viable the proposals are, at a time when local
authorities are having to make difficult budget cuts year on year.  It is our view that
implementation of the proposals would have further detrimental impacts on our budgets.   
Overall, it is very difficult to ascertain the benefits here, as there would appear to be a
potential for duplication of efforts/ double handling in terms of service delivery.  During
what is such a challenging time for local authorities and other public bodies it would seem
sensible to strengthen and continue building on those structures already in place. The
proposals have the risk of cluttering the landscape, increasing the likelihood of local
conflict/polarisation and impacting negatively on already depleted resources/finances. 
Argyll and Bute Council
01546 604325
If you’re an organisation who
held a community conversation,
please check the ‘my community
conversation’ box
Page 133

Page 134

OFFICIAL - SENSITIVE 
16 
Address 
Postcode 
Email Address 
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing 
preference: 
Publish response with name 
Publish response only (without name) 
Do not publish response
We will share your response internally with other Scottish Government policy teams
who may be addressing the issues you discuss. They may wish to contact you again
in the future, but we require your permission to do so. Are you content for Scottish
Government to contact you again in relation to this consultation exercise? 
Yes 
No 
Information for organisations:
The option 'Publish response only (without
name)’ is available for individual
respondents only. If this option is selected,
the organisation name will still be
published. 
If you choose the option 'Do not publish
response', your organisation name may still
be listed as having responded to the
consultation in, for example, the analysis
report. 
Kilmory Castle, Lochgilphead, Argyll
PA31 8RT
laura.blackwood@argyll-bute.gov.uk
Page 134

Page 135

ARGYLL AND BUTE COUNCIL                 COUNCIL
DEVELOPMENT AND ECONOMIC GROWTH     22 FEBRUARY 2024 
PROPOSED LOCAL DEVELOPMENT PLAN 2: SCOTTISH GOVERNMENT
DIRECTION 
1.0 EXECUTIVE SUMMARY 
1.1 Proposed Local Development Plan 2 (as modified) (PLDP2) was submitted to
the Scottish Ministers, as part of the Adoption process (as agreed by Council
on 28/09/23 – Item 14). The aim of this Report is to advise the Council that,
the Scottish Ministers have since issued a Direction (15th December 2023)
requiring further modifications to PLDP2. (See Appendix 1). Therefore, in
order to proceed with the adoption of Local Development Plan 2 the Council
requires to demonstrate compliance with this Direction.
1.2 The need for further modifications to PLDP2 has arisen from new regulations,
policies and targets. The modifications are considered necessary to:
• Ensure the LDP accurately reflects the current regulatory position in
respect of mitigating the effects of aquaculture development.
• Ensure the LDP takes account of the fact that National Planning
Framework 4 (NPF4) has been adopted and that this replaces National
Planning Framework 3 and Scottish Planning Policy.
• Ensure the LDP accurately reflects the Climate Change (Scotland) Act
2009 net zero target.
1.3 The modifications raise no substantive issues and are welcomed for bringing
the Local Development Plan 2 into better alignment with new national
regulations, policies and targets. 
RECOMMENDATIONS 
It is recommended that Council:
i. consider the further modifications proposed to PLDP2 by the Scottish
Ministers in their Direction, see Appendix 1;
ii. agree to the proposed modifications to PLDP2 and proceed to
adoption;
Page 135 Agenda Item 11

Page 136

iii. agree that officers notify Scottish Ministers that the modifications are
made and that LDP2 will be adopted on confirmation from Scottish
Ministers that they are satisfied the modifications are duly made. 
Page 136

Page 137

ARGYLL AND BUTE COUNCIL             COUNCIL
DEVELOPMENT AND ECONOMIC GROWTH     22 FEBRUARY 2024 
PROPOSED LOCAL DEVELOPMENT PLAN 2: SCOTTISH GOVERNMENT
DIRECTION 
2.0 INTRODUCTION 
2.1 Proposed Local Development Plan 2 (as modified) has now been considered
by the Scottish Ministers. This has resulted in the Scottish Ministers issuing a
Direction on the 15th December 2023. This Direction requires further
modifications to the plan before it can be adopted to take in to account new
policies, regulations and targets. (See Appendix 1) 
3.0 RECOMMENDATIONS
3.1 It is recommended that Council:
i. consider the further modifications proposed to PLDP2 by the Scottish
Ministers in their Direction, see Appendix 1;
ii. agree to the proposed modifications to PLDP2 and proceed to
adoption;
iii. agree that officers notify Scottish Ministers that the modifications are
made and that LDP2 will be adopted on confirmation from Scottish
Ministers that they are satisfied the modifications are duly made. 
4.0 DETAIL
4.1. The Proposed Local Development Plan 2 went through an independent
Examination into unresolved issues with Scottish Government appointed
Reporters in 2022/23. National Planning Framework 4 (NPF4) was published
during the course of this Examination and this now forms part of the Development
Plan for this area. The Examination was extended to allow the issues before the
Reporters to be reassessed for alignment with NPF4. The Examination Report
was received in June 2023. 
4.2. The Council accepted all the modifications proposed in the Examination Report.
Following this, the Proposed Local Development Plan 2 (as modified) (PLDP2)
was submitted to the Scottish Ministers, as part of the Adoption process
(Council Paper 28/09/23 – Item 14). The consideration by the Scottish Ministers
Page 137

Page 138

generally takes a 28 day period. However, this was extended by the Scottish
Ministers to allow for further consideration of PLDP2 and a Direction was then
issued on the 15th of December. This directs the Council to make further
modifications to PLDP2. (See Appendix 1) prior to Adoption. Therefore, in order
to proceed with the adoption of Local Development Plan 2 the Council requires
to demonstrate compliance with this Direction to the Scottish Ministers. 
4.3 The need for further modifications to PLDP2 has arisen from new regulations,
policies and targets. The modifications are considered necessary to:
• Ensure the LDP accurately reflects the current regulatory position in
respect of mitigating the effects of aquaculture development.
• Ensure the LDP takes account of the fact that National Planning
Framework 4 (NPF4) has been adopted and that this replaces National
Planning Framework 3 and Scottish Planning Policy.
• Ensure the LDP accurately reflects the Climate Change (Scotland) Act
2009 net zero target.
4.4 The modifications relate to: aquaculture in Policy 28 Supporting Sustainable
Aquatic and Coastal Development; emissions target being updated;
amendments to housing terminology to align with new national policy, including
Policy 65, Tables 2 and 6, and Proposal F; and, other minor amendments –
typographical and glossary. The changes are detailed in Appendix 1. 
4.5 The modifications proposed in the Direction raise no substantive issues and are
welcomed as they bring Local Development Plan 2 into better alignment with
new national regulations, policies and targets. Accepting the modifications
would allow the Council to Adopt Local Development Plan 2. 
5.0 CONCLUSION
5.1 Following approval by Full Council in September 2023, PLDP2, as modified by
the Reporters, was submitted to Scottish Ministers for approval prior to adoption. 
In December 2023, Scottish Ministers issued a direction to the Council, that it
must make further modification to PLDP2, as detailed in Appendix 1, prior to
adopting PLDP2.  These modifications are considered un-substantive and will
better align PLDP2 with NPF4.  The report recommends Council agree to these
further modifications so that PLDP2 can be adopted once Scottish Ministers have
acknowledged they have been made. 
6.0 IMPLICATIONS
6.1 Policy – Once Adopted, Local Development Plan 2 will be part of the
Development Plan for Argyll and Bute (excluding Loch Lomond and the
Trossachs National Park) alongside National Planning Framework 4. The
planning authority, in the determination of planning applications, shall have
regard to the provisions of the Development Plan, so far as material to the
application, and to any other material considerations. The Adopted Plan
contains the planning authority’s policies, proposals and allocations. 
Page 138

Page 139

6.2 Financial – None related to the Direction. However, the Adoption process has
costs which were dealt with in the 28/09/23 Council paper. 
6.3  Legal – The Adoption process is a statutory process. Once adopted the
planning authority is required to have regard to the provisions of the local
development plan as part of the Development Plan for the area, so far as
material to the application, and to any other material considerations, in the
determination of planning applications. 
6.4  HR – None.
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics - None related to this Direction. 
6.5.2   Socio-economic Duty – None related to this Direction. 
6.5.3  Islands – None related to this Direction.
6.6 Climate Change – Direction brings LDP2 into alignment with current emissions
target.
6.7 Risk – Failure to Adopt would result in i) lack of an up-to-date Plan which reflects
current Policy issues; ii) reduced alignment of Policy with National Planning
Framework 4 giving rise to uncertainty in the determination of applications; iii)
reduction in efficiency in the planning application process. Failure to follow the
statutory process correctly may open the Council to legal challenge. 
6.8  Customer Service – None. 
6.9  Rights of the Child (UNCRC) – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Policy Lead for Planning and Regulatory Support, Councillor Kieron Green                                                 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
fergus.murray@argyll-bute.gov.uk 
Matt Mulderrig, Development Policy and Housing Manager 
matt.mulderrig@argyll-bute.gov.uk 
Sybil Johnson, Senior Planning and Strategies Officer 
sybil.johnson@argyll-bute.gov.uk 
APPENDICES
Appendix 1: Scottish Government Direction
Page 139

Page 140

Appendix 1:  Scottish Government Direction 
Page 140

Page 141

Page 141

Page 142

This page is intentionally left blank

Page 143

ARGYLL AND BUTE COUNCIL  COUNCIL  
DEVELOPMENT AND 
ECONOMIC GROWTH   
22ND FEBRUARY 2024 
HOUSING EMERGENCY – WORKER ACCOMMODATION PROPOSALS 
1.0 EXECUTIVE SUMMARY 
1.1  The main purpose of this report is to provide information on worker
accommodation proposals in areas of Argyll and Bute to enable essential
services to be delivered to our communities and to request Strategic Housing
Fund grants to support these proposals. 
1.2  The report confirms the requirement for the Council to work with partners to
enable innovative housing solutions on Coll, Tiree, Mull and in the Lorn area.
1.3 It is recommended that Council:-
i. Approve a grant of £100,000 from the Strategic Housing Fund to enable 2
NHS properties on Coll to be brought back into use for HSCP staff delivering
health and social care services on the island.
ii. Approve a grant of £160,000 from the Strategic Housing Fund to enable a
Council owned property on Tiree to be brought back into use for HSCP staff
delivering health and social care services on the island.
iii. Approve a contingency of up to £250,000 from the Strategic Housing Fund
to enable the important first phase of delivering worker accommodation
properties at Tobermory on Mull.
iv. Approve a grant or loan of £200,000 from the Strategic Housing Fund to
enable the refurbishment of an ACHA owned 4 bedroom property in Lorn
and enable accommodation for HSCP staff and staff contracted by the
HSCP to deliver care to households in the community.
v. Delegate to the Executive Director with responsibility for Development and
Economic Growth, in consultation with the Executive Director with
responsibility for Legal and Regulatory Support, the terms and conditions
to be attached to any grant and / or loan agreement required as a
consequence of this report. 
Page 143 Agenda Item 12

Page 144

ARGYLL AND BUTE COUNCIL  COUNCIL  
DEVELOPMENT AND 
ECONOMIC GROWTH 
22nd FEBRUARY 2024 
HOUSING EMERGENCY – WORKER ACCOMMODATION PROPOSALS 
2.0 INTRODUCTION 
2.1 As the strategic housing authority for Argyll and Bute, the Council has a statutory
duty to assess the need and demand for housing in the area and to ensure that
any unmet need for housing is addressed through the Local Housing Strategy
(LHS) and the Strategic Housing Investment Plan (SHIP).  
2.2 The Council declared a housing emergency in June 2023. One of the main issues
identified was the lack of worker accommodation in Argyll and Bute. If the lack of
worker accommodation is not addressed there will be a serious impact on the
general economy but more specifically there will be a risk that essential health
and social care services will not be delivered in communities across the local
authority area. 
2.3 A housing summit took place in Oban on 27th November 2024. The 4 broad
themes of the summit focused on the delivery of more market homes, the delivery
of more affordable housing, the delivery of more workforce housing and how
partners make best use of existing housing. The proposals in this paper will help
to tackle the issue of delivering more workforce homes through a combination of
making best use of existing housing and also delivering more affordable housing. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Council:-
i. Approve a grant of £100,000 from the Strategic Housing Fund to enable 2
NHS properties on Coll to be brought back into use for HSCP staff delivering
health and social care services on the island.
ii. Approve a grant of £160,000 from the Strategic Housing Fund to enable a
Council owned property on Tiree to be brought back into use for HSCP staff
delivering health and social care services on the island.
iii. Approve a contingency of up to £250,000 from the Strategic Housing Fund
to enable the important first phase of delivering worker accommodation
properties at Tobermory on Mull.
iv. Approve a grant or loan of £200,000 from the Strategic Housing Fund to
enable the refurbishment of an ACHA owned 4 bedroom property in Lorn
Page 144

Page 145

and enable accommodation for HSCP staff and staff contracted by the
HSCP to deliver care to households in the community.
v. Delegate to the Executive Director with responsibility for Development and
Economic Growth, in consultation with the Executive Director with
responsibility for Legal and Regulatory Support, the terms and conditions
to be attached to any grant and / or loan agreement required as a
consequence of this report. 
4.0 DETAIL   
Background: The Housing Situation on Coll   
4.1 There are around 145 homes on the island, of which 25% are deemed ineffective
in terms of meeting local needs, i.e. 34 are second/holiday homes and a further 2
are empty/long term unoccupied. In addition there are a number of short term
holiday lets.  ACHA and Trust Housing Association currently provide 16 properties
for social rent; which amounts to only 11% of the total dwelling stock or 15% of
the occupied stock. This is well below national levels and indicates a potentially
imbalanced housing system with scope for further growth in the Registered Social
Landlord (RSL) sector. 
4.2 Affordability on the open market remains a significant issue for local residents.
The average achieved house price achieved on Coll is £185,000 which would
require a household income of £52,857 to be considered affordable. 62% of
residents on the island cannot afford to purchase on the open market; and
therefore require alternative affordable options such as social rent and shared
equity.  
4.3 Expressed demand for RSL housing is registered via the HOMEArgyll waiting list,
and currently there are 10 active applicants with Coll as first or second area of
preference. 7 of the 10 applicants have been awarded housing need points
(HOMEArgyll Waiting List, December 2023). Turnover of social rented property
has been low on the island resulting in a pressure ratio of 2 applicants to every
allocation rising to 4 applicants for every allocation of a 1 bedroom property. 
4.4 In March 2022 the HSCP in partnership with the Coll Collaborative Working Group
published a Health and Social Care Needs Assessment. This document clearly
outlines an expectation that there will continue to be a requirement for health
and social care on the island. Due to the nature of the provision of such services
in remote island location it is essential that the HSCP is able to provide
accommodation for key workers. 
Solution 
4.5 The Strategic Housing Fund grant will enable the HSCP to bring 2 NHS owned
properties back into use for HSCP staff or staff from other organisations
contracted by the HSCP to deliver health and social care services on the island.
The total cost of the project is £480 000. The HSCP will contribute £380 000 and
the Strategic Housing Fund will contribute £100,000 (21% of the total project cost).
Page 145

Page 146

The project will result in a 2 bedroom property being brought back into use and
also a 4 bedroom property being brought back into use – both for HSCP staff who
would require accommodation on the island to deliver essential health and social
care service.   
Background: The Housing Situation on Tiree  
4.6 There are around 560 homes on the island of Tiree, of which 36% are deemed
ineffective in terms of meeting local needs i.e. 167 are second/holiday homes and
a further 36 are empty/long term unoccupied. In addition there are a number of
short term holiday lets.  ACHA and West Highland Housing Association currently
provide 40 properties for social rent; which amounts to only 7% of the total
dwelling stock or 11% of the occupied stock. This is well below national levels and
indicates a potentially imbalanced housing system with scope for further growth
in the Registered Social Landlord (RSL) sector. 
4.7 Affordability on the open market remains a significant issue for local residents.
The average achieved house price on Tiree is £227,500 which would require a
household income of £65,000 to be considered affordable. In fact the average
house price is nearly 6 times the average household income. On that basis,
around 80% of local households could not afford to purchase on the open market;
and therefore require alternative affordable options such as social rent and shared
equity.  
4.8 Expressed demand for social rented housing is registered via the HOMEArgyll
waiting list, and there are 22 active applicants with Tiree as first or second area of
preference. 18 of the 22 applicants have been awarded housing need points
(HOMEArgyll waiting list December 2023). Turnover in the social rented stock has
been low to nil in recent years resulting in a pressure ratio of 9 applicants to every
allocation of social housing. 
4.9 The HSCP has set up an Islands Strategy Working Group to gather information
in health and social care on the islands and a Tiree medical practice analysis of
out of hours activity report was produced in August 2023. This revealed a high
level of calls and required responses by health and social care. There is a clear
requirement to provide accommodation for health and social care workers on the
island. In addition a recent housing needs report published in June 2023
concluded that Tiree in common with many rural areas in Scotland has a
significant shortage of affordable housing which is negatively impacting the
community’s and local businesses economic and social sustainability. 
Solution 
4.10 The Strategic Housing Fund grant will enable the HSCP to remodel an existing
property at the Tigh a Rudah Care Home on Tiree and create a worker
accommodation property which will make it more attractive for visiting health and
social care staff to work on the island. The re-modelling of the property will deliver
two ensuite bedrooms with a shared lounge/kitchen area. The Strategic Housing
Fund contribution of £160,000 will complement the capital contribution of £44,000
in relation to roof works already completed.
Page 146

Page 147

Background: The Housing Situation on Mull 
4.11 There are around 1870 homes on the island of Mull of which 16% are deemed
ineffective in terms of meeting local needs i.e. 200 are second/holiday homes and
a further 98 are empty/long term unoccupied (Council Tax Records December
2023). In addition there are a number of short term holiday lets.  ACHA, West
Highland Housing Association and Trust Housing Association currently provide
236 properties for social rent which amounts to only 13% of the total dwelling stock
or 15% of the occupied stock. This is well below national levels and indicates a
potentially imbalanced housing system with scope for further growth in the
Registered Social Landlord (RSL) sector. 
4.12 Affordability on the open market remains a significant issue for local residents.
The average achieved house price on Mull is £233,864 which would require a
household income of £66,818 to be considered affordable. As a result at least
76% of local households could not afford to purchase on the open market; and
therefore require alternative affordable options such as social rent and shared
equity. 
4.13 Expressed demand for social rented housing is registered via the HOMEArgyll
waiting list, and there are 112 active applicants with Mull as first or second area
of preference. 68 of the 112 applicants have been awarded housing need points
(HOMEArgyll waiting list December 2023). Turnover in the social rented stock has
been low in recent years resulting in a pressure ratio of 4 applicants to every
allocation of social housing. 
4.14 The Council has worked closely with Mull and Iona Community Trust to establish
the requirement for worker accommodation to support the general economy of the
island. MICT published a Mull and Iona Key Worker Housing study in 2022 which
demonstrated a clear requirement for worker housing after consultation with local
businesses. This was followed up by the publication of a Worker Accommodation
Economic Impact Assessment in March 2023 which concluded that a shortage of
accommodation on Mull and Iona has created a major constraint on the economy. 
Solution 
4.15 The Council has agreed as part of the Rural Growth Deal to deliver worker
accommodation on Mull. A Council owned site has been identified at Rockfield
Road, Tobermory and the intention is to deliver 4 properties for workers on the
island through the Rural Growth Deal as a first phase of developing the site. The
Council has secured £700k Island Infrastructure funding from the Scottish
Government (and an additional £100k from Crown Estate Funding and Place
Based Investment Fund) to assist with the design and infrastructure works for the
whole site which will ultimately deliver 12 properties for workers in a phased
manner.  A condition of this grant is that a contract for the first phase of
infrastructure work is agreed by 31st March 2024.  The tendering process is
currently under way.  There is a marginal risk, particularly in view of the recent
experience of high Island construction costs, that the tenders which are received
for the works are above the level of grant award.  In this instance unless that
Page 147

Page 148

potential gap cost can be covered, it would not be possible to award a contract
within the due date, and the grant funding could be lost.   To mitigate this risk it is
recommended that a contingency for this project of up to £250,000 from the
Strategic Housing Fund be agreed, to be used in the eventuality outlined above. 
Were this grant to be utilised, it is considered likely that it could be recovered from
the Rural Growth Deal funding at a later date.  The grant from the Strategic
Housing Fund is an important contingency to ensure continued progress in
delivery of this phased housing project which is vital to provide worker
accommodation and tackling the housing emergency. 
Background: The Housing Situation in Lorn 
4.16 There are around 9080 homes in the Lorn area of which 11% are deemed
ineffective in terms of meeting local needs i.e. 452 are second/holiday homes and
a further 506 are empty/long term unoccupied (Council Tax Records December
2023).   In addition there are a number of short term holiday lets.  ACHA, West
Highland Housing Association and LINK Housing Association currently provide
1709 properties for social rent which amounts to 19% of the total dwelling stock
or 21% of the occupied stock (RSL Annual Returns 2023). This is below national
levels and indicates a potentially imbalanced housing system with scope for
further growth in the Registered Social Landlord (RSL) sector. 
4.17 Affordability on the open market remains a significant issue for local residents.
The average achieved house price in Lorn is £186,410 which would require a
household income of £53,260 to be considered affordable. As a result at least
75% of local households could not afford to purchase on the open market; and
therefore require alternative affordable options such as social rent and shared
equity. 
4.18 Expressed demand for social rented housing is registered via the HOMEArgyll
waiting list, and there are 589 active applicants with Lorn as first or second area
of preference and have been awarded housing need points (HOMEArgyll Waiting
List December 2023). The demand for social rented stock in recent years has
resulted in a pressure ratio of 3 applicants to every allocation of social housing. 
4.19 The Council has recently appointed an Empty Homes Officer to focus on bringing
empty properties back into use for accommodation for HSCP workers. Initial work
with HSCP has identified a pressure in the Lorn area. A shortage of workers to
deliver health and social care in the community is putting the hospital under
pressure as patients cannot be discharged back to their homes due to a lack of
care provision. 
Solution 
4.20 The Empty Homes Officer has worked with Argyll Community Housing
Association (ACHA) to identify an empty 4 bedroom property in the Lorn area. The
grant or loan from the Strategic Housing Fund will enable this property to be
brought back into use as a Housing of Multiple Occupation for the exclusive use
of health and social care workers. There is an estimated £250,000 of work
Page 148

Page 149

required to bring the property up to standard including roof replacement and a
new heating system. The Strategic Housing Fund will contribute a grant or loan of
£200,000 to the project and ACHA will contribute the rest of the costs. 
Strategic Housing Fund 
4.21 The closing balance of the Strategic Housing Fund in 2023 was £10.1m as shown
in the table below which was reported to Council 29th June 2023. 
4.22 It can be seen from the table below that there is an estimated surplus in the
SHF over the next five years and Council could give consideration as to how
this could be used to support the housing emergency that has been declared
including the requests within this report which will make a valuable contribution
to tackling identified needs for worker accommodation in the short term. 
4.23 Officers are undertaking an assessment in regard to subsidy control issues and
this will be completed and issues addressed prior to issuing any third party grant
or loan approved by this paper.   
5.0 CONCLUSION 
5.1 The Council is asked to approve the recommendations set out in Section 3.1
based on the evidence supplied within this document with the purpose of enabling
the delivery of worker accommodation on Coll, Tiree, Mull and the Lorn area which
Page 149

Page 150

will enable the phased delivery of 20 worker accommodation properties. The
Strategic Housing Fund was created to allow for allocations in support of priority
projects emerging from the Local Housing Strategy and the requirement to
address the shortage of worker housing is not only identified within the Local
Housing Strategy but has emerged as a key priority in addressing the Housing
Emergency which was declared in Argyll and Bute in June 2023. 
6.0 IMPLICATIONS 
6.1 Policy - The proposal is consistent with current Council policy including the SHIP
which supports the Local Housing Strategy vision and outcomes which are
directly aligned with the overarching objectives of the Outcome Improvement
Plan, in particular Outcome 2 – we have infrastructure that supports sustainable
growth. The proposal does exceed the delegated Officer approval for the use of
the Strategic Housing Fund to enable the delivery of affordable housing which is
£12,000 per unit. 
The Council declared a Housing Emergency in June 2023 and 1 of the 4 main
areas of concern was the lack of accommodation for workers. The proposals in
this paper address this issue and enable the Council to work with partners to
deliver increased accommodation options both on the mainland and on the
islands in the short term. 
6.2 Financial - There are sufficient funds in the Strategic Housing Fund to support the
proposal as articulated in paras 4.21 & 4.22 and an assessment of Subsidy Control
is being undertaken. 
6.3 Legal - None.   
6.4 HR – Early engagement with NHS and Council HR colleagues indicate need and
demand for worker accommodation in the 4 areas of the local authority identified
in this report. Workforce planning with HSCP and within Council Services has
identified difficulties in recruitment directly due to lack of available and suitable
accommodation.   
6.5 Equalities (Fairer Scotland Duty) - The proposals are consistent with aims and
objectives set out in the local housing strategy, which is subject to an EqSEIA. 
6.5.1 Equalities – protected characteristics - There are targets set within the SHIP to
deliver housing which meet the needs of specialist groups 
6.5.2 Socio-economic Duty - The delivery of affordable housing across Argyll and Bute
facilitates socio-economic opportunities for all. 
6.5.3 Islands - The Housing Needs and Demand Assessment process takes full
account of housing need on the islands. This proposal will enable the delivery of
affordable housing in remote, fragile island communities within the local authority
area.                         
Page 150

Page 151

6.6 Risk - Risk assessment is an integral part of each affordable housing development.
The risk of not approving the Strategic Housing Fund request contained in the
report is that the 20 worker accommodation properties in Lorn and the Isles will not
be delivered. 
6.7 Climate Change: The improvement and refurbishment work carried out the
properties detailed in this report will improve energy efficiency with an ambition to
deliver the properties to the current Energy Efficiency Standards for Social
Housing. 
6.8 
6.9  
Customer Service - The proposals will deliver increased access to a range of
suitable, affordable housing options. 
Rights of the Child (UNCRC) – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Councillor Robin Currie, Policy Lead for Strategic Development 
February 2024 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth   
fergus.murray@argyll-bute.gov.uk 
Matt Mulderrig, Development Policy and Housing Manager 
matt.mulderrig@argyll-bute.gov.uk 
Douglas Whyte, Team Lead – Housing Strategy
douglas.whyte@argyll-bute.gov.uk 
Page 151

Page 152

This page is intentionally left blank

Page 153

ARGYLL AND BUTE COUNCIL  COUNCIL 
CUSTOMER SUPPORT SERVICES  22 FEBRUARY 2024 
COUNCIL ANNUAL REPORT 2022/23 
1.0 HEADLINES 
This report presents to Council the Council Annual Report (CAR) 2022/23.   
2.0 RECOMMENDATIONS 
2.1 Council are asked to note the content of the CAR 2022/23 and the wide-ranging
examples of exceptional service delivery prior to publishing on the website. 
3.0 DETAIL 
3.1 The Performance Excellence Project commenced in September 2020. Two
outcomes of the project were the frequency of performance reporting and the number
of indicators reported at Strategic Committees. 
Historically a 6-Month Council Performance Report has been presented to the Audit
and Scrutiny Committee (ASC). This 6-Monthly report contained Council-wide
performance and has now been incorporated into the Council Annual Report. 
Additionally, Quarterly Performance Reports were presented to each of the Strategic
Committees. These Performance Reports presented the indicators within Service
Plans. These indicators also became known as our Key Performance Indicators. 
For 2022/23 the indicators within Service Plans were replaced with a suite of 47
Corporate Outcome Indictors (COIs), the majority of which are annual measures. As a
result Performance Reports containing indicators have not been presented to the
Strategic Committees during 2022/23. 
The CAR 2022/23 therefore pulls together the strategic elements contained in the 6-
Monthly reports and details the performance of our 47 Corporate Outcome Indicators. 
3.2 The CAR 2022/23 largely pulls information together from the Service Annual
Performance Reviews which illustrate, through case studies, some of the Success
and Challenges that Services faced during 2022/23. Within the CAR are many
examples of the exceptional efforts, the innovative solutions and seamless joined-up
working within the council, with our partners and with communities that occurred during
Page 153 Agenda Item 13

Page 154

this period. 
This year Consultations are not listed in the CAR 2022/23, however, a link is
provided in the report to take the reader to the specific section on the Council
website. 
3.3 The CAR 2022/23 is a key document for the Councils statutory Public Performance
Reporting (PPR) duties. As in previous years’ the CAR has been posted on the website
in pdf format. A short summary of the CAR will also be posted in a web page format.
This summary will contain a link to the main report and will comply with The Public
Sector Bodies Accessibility Regulations came into force in 2018. 
3.4 It should be noted that two Corporate Outcome Indicators presented in the report
have commentary or data missing. This is due to timing of the data release and is
anticipated that wherever possible this will be resolved prior to publication. 
3.5 The CAR is presented by Corporate Outcome in the following order – 
o Forewords
o Cross-cutting Strategic Activity including our Challenges
o Our Performance
o Our Successes – Examples of Service Delivery by Corporate Outcome  
3.6 The CAR 2022/23 contains 65 pages, the previous years’ CAR contained 43
pages. This in itself gives an indication of the continuing volume of case studies and
examples of outstanding achievements. 
4.0 CONCLUSION 
4.1 Council are asked to note the content of the CAR 2022/23 and the wide-ranging
examples of exceptional service delivery prior to publishing on the website. 
5.0 IMPLICATIONS 
5.1 Policy: The publication of this report is an activity within our 
Performance and Improvement Framework.
5.2 Financial:  None
5.3 Legal: Production and publication complies with our Statutory    
Public Performance Reporting Duties.
5.4 HR:  None
5.5 Fairer Scotland Duty – see below
5.5.1 Equalities:  This report provides a summary of corporate performance     
and any equalities impacts are available from the specific     
Services. Publication complies with The Public Sector     
Bodies Accessibility Regulations 2018. This report is 
available in alternative formats upon request.
Page 154

Page 155

5.5.2 Socio-economic: None
5.5.3 Islands Duty:  None
5.6 Climate Change: This report highlights examples of how the Council is 
committed to, and working towards net zero.   
5.7 Risk:   None
5.8 Customer Service: This report provides a balanced overview of the Council’s     
performance, challenges and risks for the reporting 
period as well as examples of cross-cutting improvement     
activities.
5.9 The Rights of the Child (UNCRC): This report highlights examples of how the     
Council is committed to, and working towards reducing     
child poverty and improving outcomes for every child.   
Robin Currie
Leader of the Council 
Pippa Milne
Chief Executive                                                  
For further information contact: 
Jane Fowler
Head of Customer and Support Services 
APPENDICES
Appendix 1: Council Annual Report 2022/23_Final
Appendix 2: Summary Council Annual Report 2022/23_Final 
Page 155

Page 156

This page is intentionally left blank

Page 157

1 
Council Annual Report
2022 - 2023 
Page 157

Page 158

2 
Contents
Forewords ................................................................................................................................................................................................... 6
Leader of the Council ............................................................................................................................................................................. 6
Chief Executive ...................................................................................................................................................................................... 7
Financial Statement ............................................................................................................................................................................... 7
Cross-cutting Strategic Activities ................................................................................................................................................................. 8
Changing How We Work – Our Change Programme ........................................................................................................................... 8
Working Together To Alleviate Child Poverty...................................................................................................................................... 9
Rural Growth Deal ................................................................................................................................................................................ 10
Climate Change .................................................................................................................................................................................... 11
Best Value Improvement Action Plan 2020-2023 ............................................................................................................................... 12
Audit Recommendations ..................................................................................................................................................................... 12
Strategic Risk Register ........................................................................................................................................................................ 12
Operational Risk Register ................................................................................................................................................................... 13
Significant Challenges ......................................................................................................................................................................... 13
Complaints ............................................................................................................................................................................................ 17
Absence ................................................................................................................................................................................................ 17
Quality Conversations ......................................................................................................................................................................... 20
Our Performance ...................................................................................................................................................................................... 20
Our Corporate Outcomes .................................................................................................................................................................... 20
Performance Management Improvements ......................................................................................................................................... 21
Delivering On Our Outcomes - Corporate Outcome Indicators ....................................................................................................... 21
How We Compare Nationally – Local Government Benchmarking Framework (LGBF) ................................................................. 22
Delivering Our Outcomes - Key Successes by Corporate Outcome ......................................................................................................... 23
Page 158

Page 159

3 
Corporate Outcome: People live active, healthier and independent lives ...................................................................................... 23
Supporting people to deal with their financial problems ....................................................................................................................................... 24
Helping People Into Work ................................................................................................................................................................................... 25
Corporate Outcome: People will live in safer and stronger communities ....................................................................................... 26
Keeping People Safe .......................................................................................................................................................................................... 27
A safer place to live, work and visit ..................................................................................................................................................................... 27
Supporting Our Community Councils .................................................................................................................................................................. 28
Community Organisations Received Capacity Building Support .......................................................................................................................... 28
Building Standards achieves maximum 6-year licence ........................................................................................................................................ 29
Short-term Lets ................................................................................................................................................................................................... 29
Welcoming Ukrainian Refugees .......................................................................................................................................................................... 29
Covid Recovery Strategy .................................................................................................................................................................................... 30
Providing Support for All Our Learners ................................................................................................................................................................ 32
Nurturing and Supporting our Young People ....................................................................................................................................................... 32
My Tribe Period Product Provision ...................................................................................................................................................................... 33
Award winning School Meals Service .................................................................................................................................................................. 34
Corporate Outcome: Education, skills and training will maximise opportunities for all ............................................................... 34
Increasing Attainment at the 1st Level ................................................................................................................................................................. 36
Digital Support for Schools and Learners ............................................................................................................................................................ 37
Supporting Learners to Realise Their Potential ................................................................................................................................................... 37
Leavers Positive Destinations ............................................................................................................................................................................. 37
Rural Growth Deal – Skills and Training Programmes for Local People .............................................................................................................. 37
Carbon Literate Organisation (CLO) Bronze Status ............................................................................................................................................ 38
Corporate Outcome: Our economy is diverse and thriving .............................................................................................................. 38
Economic Growth ................................................................................................................................................................................................ 41
Page 159

Page 160

4 
Supporting the Economic Recovery and Our Communities ................................................................................................................................. 41
Business Start-Ups and Support – Two Case Studies ...................................................................................................................................... 43
Mitigating the Delays for Taxi Licencing .............................................................................................................................................................. 44
Generating Income for the Council ...................................................................................................................................................................... 44
Rural Growth Deal – Two Projects Growing Visitor Numbers .............................................................................................................................. 45
Rural Growth Deal – Mull Housing Pilot .............................................................................................................................................................. 46
Clyde Engineering and Innovation Cluster .......................................................................................................................................................... 46
West Coast Unmanned Aerial Vehicle (UAV) Logistics and Training Hub ........................................................................................................... 46
Corporate Outcome: We have an infrastructure that supports sustainable growth ...................................................................... 47
Flood Protection and Marine Works .................................................................................................................................................................... 48
Piers and Harbours ............................................................................................................................................................................................. 50
Land Based Developments ................................................................................................................................................................................. 52
Deliver the ICT and Digital Strategy Action Plan - Our aims ................................................................................................................................ 56
Microsoft365 (MS365) ......................................................................................................................................................................................... 56
ICT Partnership Working ..................................................................................................................................................................................... 56
New Ways of Working with ICT and Data............................................................................................................................................................ 57
Capital Investment and Central Repairs Delivered .............................................................................................................................................. 57
Helensburgh Waterfront Development ................................................................................................................................................................ 57
Our Workspace – Reducing Costs and Increasing Efficiencies ........................................................................................................................... 58
Carbon Emissions Relating to Council Activities ................................................................................................................................................. 58
Rural Growth Deal – Islay Low Carbon Project ................................................................................................................................................... 58
Corporate Outcome: Getting It Right .................................................................................................................................................. 59
Responding to our Customers on Time ............................................................................................................................................................... 61
Increasing the Use of our Website and Self-Service Tools .................................................................................................................................. 61
Improving Our Customer Service ........................................................................................................................................................................ 62
Page 160

Page 161

5 
Supporting our Community Councils ................................................................................................................................................................... 63
Local Government Elections and Supporting New Elected Councillors ............................................................................................................... 63
Looking After our Financial Assets ...................................................................................................................................................................... 64
Retaining Our Skilled Workforce ......................................................................................................................................................................... 64
Consultations – We Asked, You Said, We Did .......................................................................................................................................... 64 
Page 161

Page 162

6 
Forewords 
Leader of the Council 
Scottish councils are living in interesting times, as the saying goes – and that has been the case for the past decade and more. Climate change;
well-documented financial challenges; the ongoing reverberation of the impact of Covid; living costs; adapting to evolving national priorities;
community aspirations and ambitions; these are just a few of the major shifts and challenges which Scottish local government has to contend with. 
I am not, though, going to say that Argyll and Bute is no different – because we are different. We do indeed have the same larger-scale issues to
face, but we must also do so in the context of our uniqueness – our mix of remote, rural and island communities, interspersed with some larger
towns, the likes of which few other public agencies have to deal with.
And, for Argyll and Bute, there are some characteristics which remain constant and which give us the ability to evolve, to innovate, to learn, to
improve, to respond, to take action, to prepare, even when so much of the local government landscape around us is shifting at pace. 
In this Annual Report for Argyll and Bute Council, 2022/23, you will find more about these hallmarks of Argyll and Bute Council’s approach, and how
they are helping us to make the most of new opportunities and deal with existing and emerging challenges. 
Our track record in efficient financial management has, yet again, allowed us to continue to invest in the key areas of council business which mean
the most to our communities and help us to secure success now and in the future. At the same time, we have been able to minimise the impact on
jobs and services. The sterling efforts of our dedicated, agile, committed workforce are key in all of this and none of it would be possible without
them. 
No council can resist change – but here in Argyll and Bute we are working hard to make change work for our communities who depend on our core
services. We rely on our proven strengths – like good partnership working and financial prudence – and we strive for improvement, making space to
learn and ensuring we stay flexible and innovative in such a rapidly changing national environment. 
This latest Annual Report highlights many of the success stories we have been able to tell over the last year, about why Argyll and Bute is such a
great place to live, to work, to do business, to be. It sets the scene for our continued growth and improvement in years to come – and building on
what we’ve achieved this year increases our determination, our drive, our ambitions for Argyll and Bute’s future success. 
Councillor Robin Currie
Leader, Argyll and Bute Council 
Page 162

Page 163

7 
Chief Executive
It is with pleasure that we present the Argyll and Bute Council Annual Report for the financial year 2022/23. This report provides overview of your
council's activities, achievements, and challenges over the past year. As we navigate through the evolving landscape of local government and strive
to meet the needs of our diverse and vibrant communities, this document offers transparency into our actions and progress toward the collective
goals we have set for the region.
The past year has been marked by unprecedented challenges, from the cost of living crisis to economic uncertainties, and through-out this it has
been a time of resilience, adaptation, and innovation for Argyll and Bute. 
In this report we provide examples of our progress against objectives and outcomes and these efforts would not have been possible without the
dedication of our council members, employees, and the active engagement of our community members.
As we move forward into the next year, we acknowledge that our work is ongoing. Challenges persist, and new opportunities continue to emerge.
Yet, with the same determination and collaborative spirit that has defined our council, we remain steadfast in our dedication to building a stronger,
more inclusive, and sustainable future for all who call Argyll and Bute home.
We invite you to explore this annual report and gain insights into our journey over the past year. Your feedback and support are crucial to our
success, and we look forward to continued engagement as we work together to create a brighter tomorrow for Argyll and Bute. 
Pippa Milne
Chief Executive, Argyll and Bute Council 
Financial Statement
In 2022/23 the budget gap was £2.221m, prior to any measures to balance the budget, rising to over £37m over a five year period, with decisions
made to bridge the 2022/23 gap, reduce future year pressures and protect vital services. 
Furthermore, when agreeing the 2022/23 budget, the Council committed investment in key Council priorities including: 
• £2.653m to undertake improvements and repairs to the Roads network
• £1m to help safeguard and support future funding for Argyll and Bute’s Learning Estate Investment Programme
• £0.500m investment in Climate Change Projects
• £0.500m for active travel through further improvements of footpaths and supporting safer routes to schools.
• £0.300m to deliver a programme of street lighting
• £0.165m investment in third party organisations who support our Communities 
Page 163

Page 164

8 
• £0.100m invested in a litter bin replacement programme
• £0.100m to support Staycation investment 
Over the course of 2022/23 the Council allocated over £4.3m to Council Tax accounts to support people through the cost of living crisis, awarded
nearly £18m of non-domestic rates reliefs to support local businesses, paid almost £660k in Scottish Welfare Fund grants to support vulnerable
people and over £800k of Discretionary Housing payments were distributed to households in need. During the year the Council also continued to
pay grants to cover food and fuel for people in poverty and successfully referred them for support to advice agencies resulting in maximised benefit
income and reduced fuel costs of over £2.5m by the end of the 2022/23. 
Cross-cutting Strategic Activities 
Changing How We Work – Our Change Programme
‘Connect for Success’ is our change programme that’s all about us working easily and effectively together, and by doing so - making it easier for us
to deliver what’s needed of us. Years of multi-million pound budget cuts have made it more and more difficult for councils to deliver services and
support their communities. We are developing new ways of working together that make it easier to get things done. In brief, it means that we share
knowledge, effort and resources to do the best job possible for and with our communities.
There are 7 principles to the Connect for Success Programme
1. One Council One Place Approach - working with other public sector agencies and our communities to get the most from our resources.
2. Purpose and Mission Focus – we have limited resources, we need to carefully match our decisions to the council’s overall vision.
3. Employee empowerment - our employees have great skills and experience, we’re making it easier to work effectively.
4. Data and evidence driven decision making - we will use data and customer feedback to do more of what works well and change what doesn’t.
5. Learning Council - we are improving how we work by learning and using lessons from previous experience.
6. Agile – to we have decision-making and related processes that make it easy to put effective change into action.
7. Maximise opportunities that technology offer - we use technology to enable, support and progress our work. 
Page 164

Page 165

9 
The following are some examples of Connect For Success in action:
➢ One Council One Place Approach - we have set up a Community Engagement Group that is setting out expectations for working with our
communities in designing services.
➢ Data and evidence driven decision making - we have set up a Data Group to produce customer insight from data across the council that we
can use to develop services. 
➢ Maximise opportunities that technology offer – we are implementing one system to replace three HR systems. 
We are also embarking on a series of self-assessments to identify priorities for redesigning services. Pilots of the process are currently underway.
These will be reviewed prior to a decision on formal adoption or any adaptations to the pilot process. 
Working Together To Alleviate Child Poverty 
Alleviating Child Poverty is one of the council’s top priorities. We have been looking at innovative ways to combine data from multiple sources, both
from within and outside the council. This enables us to better direct financial advice and guidance to households and communities to help them
apply for and receive the benefits, grants and allowances available to families.  We are engaged with the Improvement Service and in particular their
Rural and Island Child Poverty Support Group. During the course of 2022/23 our work with the Improvement Service focused on the following three
work-streams:
➢ Engaged with a research body called SAVVI (Scalable Approach to Vulnerability Via Interoperability). Following this engagement we lobbied
national agencies such as the Department of Work and Pensions (DWP) and Social Security Scotland (SSS) to allow us to re-use their data,
which in turn enabled us to support vulnerable families. 
➢ Developed a data model that enables us to identify the communities where the uptake of some benefits is lower than other communities. 
➢ Seek funding from external sources to explore the option of ‘buying’ commercial datasets. This will enable us to enhance what we can tell
from data about the needs of our communities.
We began working with the Improvement Service to incorporate the council’s Revenues & Benefits data into this modelling, and also to explore the
data in much more detail, such as school catchment level. This makes coordinating support easier and more accurate, rather than looking at data at
a higher level where unmet need can be missed. 
Progress is ongoing for each of these work-streams, which will further improve our activities to encourage uptake of benefits, grants and allowances.
Alongside this we are monitoring the impact of this work over time as we aim to see uptake in these targeted areas improve. 
This activity is a clear example of our ‘Connect for Success’ Change Programme, in which Principle 4 seeks to focus on enabling data and evidence
driven decision making.
Page 165

Page 166

10 
Rural Growth Deal
The Rural Growth Deal (RGD) will deliver £70m of investment across Argyll and Bute for projects that act as a driver for transformation and inclusive
economic growth.  Throughout 2022/23 we have been working to progress the outline business cases required for the signing of the Full Deal
Agreement.  To date 4 outline business cases have been submitted to Government with a further 7 nearing draft completion.  We plan to submit all
remaining business cases to Government in 2023 and we are working towards signing the Full Deal Agreement in this financial year.  Following the
deal signing we will enter year 1 of delivery. 
Specific outline business cases are mentioned at appropriate points throughout this report. 
The 4 outline business cases that have been submitted to government are:
➢ Kintyre Seasports 
➢ Marine industry training centre – UHI Argyll college are leading on this business case
➢ Clyde engineering and innovation centre 
➢ Oban UAV hub 
The 7 outline business cases that are nearing completion are:
➢ Rothesay pavilion
➢ Islay low carbon project
➢ Outline business case for housing on Islay
➢ Outline business case for housing on Mull
➢ Seaweed and shellfish innovation centre (SAMS)
➢ Machrihanish campus (linked with Stirling university)
➢ Rural skills accelerator programme (Outline business case contains 3 projects
The website also has a specific Question and Answer section which you can access from this link Rural Growth Deal - questions and answers |
Argyll and Bute Council (argyll-bute.gov.uk)
We also post regular project updates on the website which you can access from this link Rural Growth Deal | Argyll and Bute Council (argyll-
bute.gov.uk) 
Page 166

Page 167

11 
Climate Change
The Council has a statutory duty to report on its emissions and climate action via the annual Public Bodies Climate Change Duties (PBCCD) Report. 
Regular update reports are presented to the Council’s 6-weekly Climate Change Board which provides governance, oversight and discusses
progress and action.
The PBCCD Report for the year 2022/23 confirms that the Council’s total carbon emissions is 26,512 tonnes of carbon dioxide equivalent (tCO2e).
This represents a reduction of 1,705 tCO2e on total emissions for the previous year. Reductions are confirmed across Scopes 1, 2 and 3 emission
sources.
The following is an explanation of the Scopes 
➢ Scope 1 emission sources are direct emissions generated by an organisation itself. Examples include energy and fuel used in running
boilers, and burning fuel in non-EV fleet vehicles.
➢ Scope 2 emission sources are emissions that an organisation causes indirectly, and comes from where the energy it purchases and uses is
produced.
➢ Scope 3 emission sources includes emissions that are not produced by the organisation itself, but by those indirectly responsible up and
down its value chain. 
Projects delivered by the Council that have contributed to the reduction in emissions include:
➢ LED Streetlight Replacement programme 
➢ Solar PV and LED lighting installations at Council assets
➢ Installation of low carbon heating systems (e.g. air source heat pumps) 
Additionally, the Council’s Home Energy Efficiency Team provides grants to homeowners and private-rented tenants to improve home insulation.
This is via the Scottish Government’s Energy Efficient Scotland: Area Based Scheme.
The Council’s annual Public Bodies Climate Change Duties Reports for previous years are available to the public via the Sustainable Scotland
Network website https://sustainablescotlandnetwork.org/reports/argyll-and-bute-council 
Page 167

Page 168

12 
Best Value Improvement Action Plan 2020-2023
The Best Value Improvement Action Plan is now complete. Our Annual Audit Report from Audit Scotland in November 2022 concluded that the
Council has an appropriate and effective best value framework in place and continues to make good progress addressing the recommendations in
Best Value Assurance Report 2020. 
The Improvement Action Plan was broken down into 5 themes: 
Theme 1 - Develop the transformation agenda, supported by an affordable and achievable medium to longer term financial strategy.  
Theme 2 - Improve performance management reporting to provide a balanced picture of long term trends in performance against targets. 
Theme 3 - Increase the pace of transformational change to deliver the business outcomes. 
Theme 4 - Assess the extent to which regeneration and economic development initiatives are delivering the vision and corporate outcomes. 
Theme 5 - Work with communities and community groups to improve engagement. 
Delivery of the 5 themes was through 36 actions. Full detail of the actions can be found on the council website Best Value Improvement Action Plan
- Audit and Scrutiny Committee, 16/03/2023 
Audit Recommendations
An essential element of the work undertaken by Internal Audit is to monitor and assess whether recommendations relating to its findings, and that of
external audit, have been implemented by management of the Council. As part of the regular monitoring of progress, audit recommendations are
reported quarterly to the Strategic Management Team and actions to complete them are recorded and allocated to the responsible officers.
Supporting evidence is required from the responsible officer before being assessed by the auditor making the recommendation. 
Strategic Risk Register
The Strategic Risk Register (SRR) details significant challenges faced by the Council and the agreed approaches to manage them in the context of
risk mitigation. These challenges can be cross-cutting across all areas of the Council, although some are very specific to a service function and tend
to be long-term in nature. They each have specific interventions, subject to scrutiny at Strategic Committee Level and kept under formal review bi-
annually, although the SRR can be reviewed in the intervening period should matters need to be placed on the register by the Council’s Strategic
Management Team. A formal report is prepared on an annual basis by the Chief Executive on risk management and is reported to the Council’s
Audit and Scrutiny Committee. 
Currently the SRR has 14 risks in total. Four are red, seven are amber and the remaining three are green.  
Page 168

Page 169

13 
The four red risks relate to: 1) Population, External Infrastructure and Economic Decline, 2) Waste Management, 3) Cyber Security 4) Lack of
Housing Availability.
The seven amber risks relate to 1) Condition and suitability of Infrastructure & Asset Base, 2) Financial Sustainability, 3) Governance and
Leadership, 4) Engagement and Understanding the needs of the Community, 5) Health and Social Care Partnership, 6) Cost of Living Crisis and 7)
Impact of Climate Change.
The three green risks relate to 1) Service Delivery, 2) Civil Contingency and Business Continuity, 3) Welfare Reform.
Operational Risk Register
Separate from the Strategic Risk Register we monitor Operational Risks. These largely relate to a direct impact on service deliver. Our Operational
Risks are categorised into Red, Amber and Green. Key actions have been agreed to address all risks in the Operational Risk Register. 
All of our Red Operational Risks are summarised here with some mentioned in more detail in our Significant Challenges section of this report below. 
Executive Director Kirsty Flanagan has eleven red risks which relate to: 1) maintaining the road network for both condition and safety particularly
vulnerable coastal locations, 2) non-compliance for maintaining vehicles through legislation, 3) the lack of suitable candidates particularly for routine
road repairs and grass cutting on the islands where there is a lack of suitable accommodation, 4) the revaluation of buildings for non-domestic rates
by the assessor, 5) the impact of Covid on environmental health enforcement with limited budgets, 6) availability of suitable temporary
accommodation and housing support, 7) extreme localised weather causing loss of bridge, culvert, road or sea defence, 8) increased Winter
maintenance on our roads, 9) implications of the biodegradable municipal waste landfill ban, 10) aging bridges and retaining walls requiring
investment, and finally 11) the risk of cyber security breaches and attacks. 
Executive Director Douglas Hendry has six red risks which relate to: 1) unavailability of capital funding for the delivery of significant projects, 
2) increasing utility costs, 3) delivery failure of school kitchen supplies, 4) capital investment to keep buildings safe and operational, 5) capital
receipts targets not being met, and finally 6) not satisfying the compliance conditions of all external funding to the Council. 
Significant Challenges
As well as our Strategic and Operational Risk Registers, we face some day-to-day that can impact on service delivery. Here we summarise these
challenges. 
1. Staff Recruitment
Challenge - There is a national shortage of qualified professionals, specifically environmental health officers, building standards surveyors and
qualified planning professionals. We also experience difficulties in recruiting and retaining staff for posts in the catering, cleaning and some areas of
Page 169

Page 170

14 
our Roads and Infrastructure Service. This places significant pressure on staff and reduces the capacity and resilience of teams. In turn the ability to
competently deliver services and our statutory duties is put under considerable strain.
Action - Various actions have been implemented to help mitigate these challenges. These include reprioritising workloads and redesigning how
services are delivered. Work is shared across a ‘virtual’ team rather than the traditional geographical teams. Staff structures have been reviewed
and realigned creating opportunities for upskilling and career pathways to build resilience. 
Importantly the combination of these actions should also support the moral and mental health of staff, as well as improve service delivery, customer
engagement and communication. 
2. Securing Contractors
Challenge - It is often difficult to secure contractors and consultants. There have been significant projects were only one tender was returned. This
resulted in the need to re-tender or delay the project. 
Action – Contractors are encouraged to apply to be admitted into the Council’s Dynamic Purchasing Scheme. This widens the pool of contractors
that are both willing and able to work in Argyll & Bute. Where possible we also use different delivery models with more emphasis on a mixed
economy solution. We also use a mix of in-house resources, Small Medium Enterprises and as well as national suppliers. 
3. Sickness Absence Due To Stress or Anxiety
Challenge - Sadly Stress and Anxiety consistently accounts for the highest proportion of days lost to sickness absence across the council. 
Action - We conducted a wellbeing survey, the results showed that 29% of employees who had been absent with stress or anxiety had not accessed
the structured Employees Assistance Programme that is available. We undertook a 3 month pilot with our partners who provide our Employees
Assistance Programme. Unfortunately this pilot was unsuccessful and was not rolled out further. We continue to remind staff of our Employee
Assistance Programme, and the ways they can access it so that they can make contact. Additionally, alternative ways to offer support are being
explored and outlined. 
4. Unplanned Demands
Challenge – We have experienced several unplanned demands. These demands increase the pressure on delivery of the statutory or committed
services, additional budgetary pressure and pressure on staff to deliver unplanned demands. The agility of our staff is the key to being able to deliver
these unplanned demands. 
Action - To help mitigate these additional pressures where possible we have revised our processes, systems and recruited additional staff.
Page 170

Page 171

15 
5. Emergency Resilience and Planning
Challenge - We have a continuing duty to promote or enforce standards that preserve public health, public safety and protect the environment. The
remit is wide-ranging, from a suspected or confirmed outbreak of a communicable disease or an animal health incident such as avian influenza or
rabies. 
Action - To ensure we continue to protect the public, environment and promote public safety we are reviewing our emergency plans and
arrangements. This will ensure our level of preparedness for any emergency incident is suitable and robust. 
6. Electric Grid Limitations 
Challenge - Many areas within Argyll and Bute are off grid for gas, and the electrical grid has limitations in terms of capacity/constraints. These
issues continue to impact on the Council (and the wider community) in terms of resilience and being able to deliver renewable solutions, Electric
Vehicle charging, electrification of heat, etc. 
Action - We are lobbying the regulator to highlight the impact of these constraints. We also lobby the Electrical Network Operators, emphasising the
need for them to reinforce their infrastructure. 
7. Cost of Living Impacts
Challenge - The Cost of Living Crisis impacts on individuals, businesses and our ability to deliver services across all service areas. Price increases
and supply issues are continuing across all industry sectors. We have our ambitious 10 year Rural Growth Deal projects. The project budgets are
fixed for the 10 year programme period with limited capacity to build cost escalation contingency into the projects. Other significant pressures are the
cost of school catering and the impact on the building sector. 
Action - We continue to explore process improvements to identify efficiencies. We look at external funding to address any funding gaps and monitor
our contacts and supplies on an on-going basis, ensuring the supplies are appropriate. 
8. Managing Delivery of Large Scale Projects
Challenge - As well as financial resources for large projects, staff resources are required from various teams across the Council to deliver the
projects. 
Action - We are undergoing early engagement and where possible designing projects to limit ongoing staffing costs. Work has begun to identify the
staff resource requirements for the projects. 
Page 171

Page 172

16 
9. Improving How We Support All Our Pupils
Challenge - There has been a significant increase in school exclusions from previous years. This increase is primarily due to an increase in
dysregulated behaviour and is reflective of the national picture. 
Action - We have identified this as an area requiring further attention and will provide targeted support for specific schools where exclusion rates are
highest and continued universal guidance and support for all schools around alternatives to exclusion. There will be a sustained focus on Our
Children Their Nurturing Education (OCTNE), Season’s for Growth and Trauma Informed approaches all of which support staff to better understand
and respond to distressed and dysregulated pupils, with a focus on early intervention. 
10. Cyber Security
Challenge - The need for our ICT teams to be ever more vigilant and responsive has never been greater. 2022/23 saw another major rise in the
levels of risk associated with cyber-attacks. The war in Ukraine has been accompanied by increased levels of cyber-attacks emanating from Russia
and elsewhere. The public sector has repeatedly experienced significant cyber-attacks which disrupt services and has cost millions of pounds. This
has been a global phenomenon. 
Action - We have procured a new Security Operations Centre service. This will be implemented over the summer of 2023. This will provide a 24 hour
monitoring service for the Council’s network. We introduced new Cyber Awareness training from Mimecast and are actively promoting the training to
all networked staff. 
11. Improving Housing Solutions for Local People
Challenge - The housing system is increasingly complex and contains wide ranging effects on the society we live and work in. Across the UK, the
housing system is now in a position commonly recognised as being in a state of emergency. Within Argyll and Bute, these problems have had a
direct impact on property prices. There have been substantial increases in our area in recent years, private rental levels are rising at a substantial
rate, housing availability is decreasing despite our social rent build programme and local wages are not keeping up with inflation. 
Action - We have already identified improving housing solutions for local people as a priority. There is a need for the Local Housing Strategy (LHS) to
consider these recent issues in more detail and examine if they can be addressed by the Council, or our partners including the Scottish Government. The
LHS is updated annually, and it is proposed that this is the appropriate vehicle to do this. To support this, officers have set up an internal Housing Group
with relevant senior officers from across the Council’s Services participating.   
12. Changes to Managing Our Waste
Challenge - The Biodegradable Municipal Waste (BMW) ban is due for introduction in January 2026. This will affect the current waste collection and
disposal methods. Ferry capacity to service the requirements of the BMW ban and other emerging changes need to be planned and managed. 
Page 172

Page 173

17 
Other merging changes including Persistent Organic Pollutants (POPs), Circular Economy bill, carbon reduction initiatives, and market availability
particularly for Energy from Waste (EfW) feedstock. 
Action - Solutions identified through the Waste Strategy with ongoing discussions with Scottish Government and other appropriate bodies around
derogations and implications of the changes of various legislation and regulations will bring to the rural geography of Argyll and Bute. 
Complaints
In 2022/23 the number of stage 1 complaints fell to 467 from 499 in 21/22. Stage 2 complaints rose to 219 from 201 in 21/22.
Roads and Infrastructure Services continued to receive the majority of complaints in 2022/23 (stage 1 - 360) and (stage 2 - 122) 
Performance within timescale has fallen in 2022/23 to 79% for stage 1 against 82% in 21/22 and 59% for stage 2 against 70% in 21/22. The
Compliance and Regulatory team will continue to support services to try to improve this, through the provision of monthly reports which are sent to
Executive Directors/Heads of Service and Service Complaints representatives. 
All Council services follow the Scottish Public Services Ombudsman’s (SPSO) model complaint handling procedure (CHP). A requirement of this
model procedure is that the Council report to the SPSO on a standard set of statutory performance indicators, and prepare an annual report for
consideration by Members. You can view the Council’s Complaints Annual Report 2022/23 through this web link. Microsoft Word - Annual
Complaints Report 2022-23 V0.1 (argyll-bute.gov.uk) 
Absence
The number of working days lost to sickness in the UK hit a record high in 2022 according to data published by the Office of National Statistics.  The
number of working days lost because of sickness increased beyond pre pandemic levels.  The increase is a contrast from the low levels of absence
at the peak of the pandemic when many workers were furloughed, working from home and social distancing led to a drop in minor illness but it also
marks a reversal in the long term trend of declining sickness absence rates.
Absence data for 2022/23 saw increase for both Teachers and LGE. Teachers absence has increased by 0.60 of a day to 6.2 work days lost per
FTE.  LGE staff has increased by 0.90 work days lost per FTE to 14.3 days. 
Page 173

Page 174

18 
Working Days Lost per Full Time Employee - By staff category and financial quarter 
2020/21
FQ1
2020/21
FQ2
2020/21
FQ3
2020/21
FQ4
2021/22
FQ1
2021/22
FQ2
2021/22
FQ3
2021/22
FQ4
2022/23
FQ1
2022/23
FQ2
2022/23
FQ3
2022/23
FQ4
All Staff  2.75 3.21 4.46 3.97 4.48 4.05 5.09 5.19 5.36 4.88 5.35 6.52
Teacher  0.82 0.92 1.52 1.15 1.36 0.89 1.60 1.77 1.79 1.22 1.70 2.28
LGE Staff 
1.94 2.29 2.94 2.82 3.32 3.16 3.49 3.42 3.57 3.66 3.65 4.04 
Figure 1:  Teacher, LGE and All Staff absence trends across each quarter since 20/21
Page 174

Page 175

19 
The top three reasons for absence in 2022/23 have been:
➢ Mental Health
➢ Infections
➢ Other musculoskeletal (e.g. broken/fractured bones, ligament damage, strains, pain) 
This is a different list from the year previous where Stomach/Liver/Kidney/Digestion issues and Medical Treatment featured in the top 3 as well as
Mental Health. Covid absences began to be recorded under normal sickness absence with effect from 1 July 2022 this along with no Covid
restrictions is likely to have accounted for infections moving into the top 3 reasons for absence.
The following is an analysis of the reasons for absence across the service conditions of APTC, Manual and Teachers for all work days lost:
➢ For APTC it was Mental Health absences accounting for 32% of work days lost
➢ For Manual Workers it was Mental Health absences accounting for 19% of work days lost
➢ For Teachers it was Infections accounting for 28% of work days lost. 
We have launched pilots for a number of activities in the area of Wellbeing including: 
➢ first day assistance for those that report absence due to mental health reasons
➢ online physiotherapy including webinars for desk based employees and body mapping workshops for manual staff
➢ a 12 week programme focusing on building sustainable healthy habits to support health
➢ wellbeing webinars on a range of topics 
Those activities that have focused on supporting employees in the workforce have been much more successful that those that focused support on
employees who had already reported absent.  Those that have been successful will be continued this year.  Argyll and Bute Council’s Wellbeing
Toolkit will be launched on 13 September 2023 available on our MyCouncilWorks giving employees and managers’ access to lots of health related
information, sources of support and access to relevant policies and procedures to support continued good health.
Going forward additional wellbeing focus will be on:
➢ developing focused and targeted corporate communications on wellbeing
➢ continued support for managers with ongoing absence cases and team based intervention tools
➢ improving mental wellbeing 
Page 175

Page 176

20 
Quality Conversations
Our approach to PRDs has changed. Our updated approach is based on measuring and improving outcomes from the conversations that managers
and employees have about performance, behaviours and career / development aspirations. Our approach is called Quality Conversations.
Quality conversations are at the heart of how we do our business. Having the skills and confidence to engage in quality conversations with our
colleagues, partners and communities is one of our key priorities. 
During 2022/23 we launched the roll out our new approach, following which we conducted the first survey.
Analysis told us that 53% of responders had received a Quality Conversation.
The key findings are:
➢ People are clear about what’s expected from them in their role.
➢ They know what skills and behaviours are required to achieve their objectives.
➢ They have the knowledge and skills to achieve their objectives.
➢ They know where to access help to meet their objectives.
These results will become our base survey and will be repeated and reported on annually.
Our Performance 
Our Corporate Outcomes
Our Corporate Plan sets out our mission to deliver on the vision shared with our Community Planning Partners - Making Argyll and Bute a place
people choose to Live, Learn, Work and do Business. For the Council this is delivered through the 6 Corporate Outcomes:
➢ People live active, healthier and independent lives
➢ People will live in safer and stronger communities
➢ Children and young people have the best possible start
➢ Education, skills and training maximise opportunities for all
➢ Our economy is diverse and thriving
➢ We have an infrastructure that supports sustainable growth
To enable us to deliver on our 6 Corporate Outcomes we have one supporting outcome ‘Getting it right’. Activities within this outcome underpin our
cross-cutting ways of working, efficiencies and behind-the-scenes service delivery. 
Page 176

Page 177

21 
Each Corporate Outcome is delivered through the Corporate Outcome Indicators. 
Performance Management Improvements
A project to review our performance management and reporting procedures has been undertaken with the first phase nearing completion. During
2022/23 several outputs of the Performance Management Project were implemented. One aim of the project is to support scrutiny of performance by
Elected Members and Senior Officers. As a result the following changes were made – we removed Business Outcomes and identified a suite of 47
high-level indicators that directly align to the Corporate Outcomes. 
These 47 indicators are known as the Corporate Outcome Indicators (COIs). Aligning the COIs to our Corporate Outcomes helps illustrate how we
are delivering on our Outcomes. The indicators are strategic and long-term in nature. They are reported annually after FQ4 to the Audit and Scrutiny
Committee and Full Council, and thereby presented within this report. 
We continue to report other indicators of importance on a quarterly basis at each of our Area Committees. The Quarterly Area Performance Reports
present a suite of indicators at a local, area level with complementary narrative, and where possible Council-wide performance is also presented
alongside these indicators. All previous Area Performance Reports can be viewed on the Council Website here. All previous Quarterly Area
Performance Reports can be viewed on the Council Website here (argyll-bute.gov.uk). 
Delivering On Our Outcomes - Corporate Outcome Indicators 
2022/23 is the first year that the 47 Corporate Outcome Indicators have been used. Due to the nature of the change it is not possible to draw a direct
comparison to previous years’ performance however, where possible historic data is used to help identify the overall trend and progress on
delivering our Corporate Outcomes. 
Where appropriate a Target is used to track Performance and progress is identified using a Red or Green status indicator to track performance. Not
all indicators have a Target, where this is the case the trend data is helpful for scrutiny. 
For the majority of indicators the data is collected and presented annually, or even quarterly if this is possible and appropriate. However, in some
cases the nature of the indicator means the collection of data results in a longer lag-time, or the data is collected biennially. 
The following table illustrates how we have delivered on each of our Corporate Outcomes. This is followed by the detailed performance and
supporting commentary for our Corporate Outcome Indicators. 
Page 177

Page 178

22 
Overall Performance Of All Our Corporate Outcome Indicators
Corporate Outcome Number Of
Indicators
Number On Track / Above
Target / No Target With
Improving Performance
Number Off Track /
Under Target / No
Data 
People live active, healthier and independent lives 6 4 2
People will live in safer and stronger communities 4 3 1
Children and young people have the best possible start 8 7 1
Education, skills and training maximise opportunities for all 7 6 1
Our economy is diverse and thriving 12 10 2
We have an infrastructure that supports sustainable growth 5 5 0
Getting It Right 5 4 1
TOTALS  47 39 8 
How We Compare Nationally – Local Government Benchmarking Framework (LGBF) 
We view benchmarking as a crucial tool to help us improve as well as using a variety of improvement tools. We attend and contribute to all the
national groups and networks as well as the Local Government Benchmarking Framework (LGBF) which all local authorities participate in.
All local authorities participate in the Local Government Benchmarking Framework (LGBF).The aim of the Framework is to present a range of
indicators that can be used to compare performance across all Scottish local authorities. There are many differences to take into account when
comparing our performance with other councils. To help make these comparisons more meaningful and share good practice we are part of a 'family
group' of eight other councils, with similar characteristics such as the type of area and levels of deprivation. More detail on the LGBF and ‘family
groups’ can be found by clicking on the above link, you will be taken straight to the LGBF where you can compare our performance. 
The 2022/23 data is due for release in December 2023. The latest full-year data that is available is for 2021/22. 
As well as participating in the LGBF we actively engage with other sector specific organisations. This allows us to share best practice and
benchmark our performance, both activities are valuable tools to help us identify improvements.
Page 178

Page 179

23 
Delivering Our Outcomes - Key Successes by Corporate Outcome
Corporate Outcome: People live active, healthier and independent lives 
Number of Indicators: 6 
Number on Track: 4 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Maximise distribution of
Scottish Welfare Fund 95.30% 96.70% 85.90% 120.70% 144.00% G
The 2022/23 overspend has been covered by earmarked
reserve from 2021/2022. This has ensured that the Council
has been able to continue its support to its most vulnerable
citizens in the year through the provision of Crisis Grant and
Community Care Grant funds. 
Percentage of clients
satisfied that they are
better able to deal with
their financial problems
90.00% 100.00% 100.00% 100.00% 100.00% G
This voluntary survey is distributed with no obligation for a
client to complete or respond. All clients who expressed an
opinion agreed that they are better able to deal with their
financial problems following our support.
It is important to note that no negative comments or
responses were received.
Maximise distribution of
Discretionary Housing
Payment (DHP) fund
96.00% 101.60% 99.90% 98.20% 79.00% R
Actual expenditure at yearend was £807,000 meaning a
funding underspend by £172,000 in 2022/23.  Looking at the
detail we received less claims for bedroom tax Discretionary
Housing Payment and benefit cap Discretionary Housing
Payments than the Scottish Government had forecast. 
Percentage of care
services graded 'good'
(4) or better in Care
Inspectorate Inspections
(HWBOI NI17)
75.20% 85.00% 87.10% 80.00% 79.50% G
This indicator measures Adult Services rating only. The
HSCP report for this measure is updated in line with Health
And Care Experience Biannual schedule, however Care
Inspectorate gradings are updated more frequently.
Percentage of adults
receiving any care or
support who rated it as
excellent or good
75.30% 79.90% 78.30% 78.30% 68.60% R
Biennial Data Periods 2017/19; 2019/21; 2021/23 
There is no update to the data until Feb 2024 at the earliest.
It is worth noting that performance against this target will be
influenced and vary in line with the Biennial total number of
Page 179

Page 180

24 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
respondents participating in this voluntary survey. As such
caution should be noted with regards to previous comparison
and trends.
Percentage carers who
feel supported to
continue in their caring
role
29.70% 35.00% 35.00% 38.00% 38.00% G
Biennial Data Periods 2017/18; 2019/20; 2021/22 
There is no update to the data until Feb 2024 at the earliest.
It is worth noting that performance against this target will be
influenced and vary in line with the Biennial total number of
respondents participating in this voluntary survey. As such
caution should be noted with regards to previous comparison
and trends. 
Supporting people to deal with their financial problems
Helping residents maximise their income through claiming additional benefits or paying grants to vulnerable people assists with independent living,
preventing homelessness and helps reduce the number of households and families living in all various types of poverty including extreme poverty. 
The following are some headline figures illustrating how we have distributed the payments and our performance - 
➢ A total of £659,812 in Scottish Welfare Fund grants were paid to support vulnerable people.
➢ A total of £804,839 of Discretionary Housing Payments was distributed to household in need.
➢ We paid out £133,625 in grants to cover food and fuel for people in poverty and successfully referred them for support to advice agencies. 
➢ During the year a total of 1,810 families have been supported to maximise benefit income and reduced fuel costs to the value of £2.527m.
➢ We allocated £4.3 million to Council tax accounts to support people with the cost of living crisis. 
➢ The average processing time for New Housing Benefit claims was 25.63 days and 5.60 days for changes in circumstances against targets of
21 days and 6 days respectively.
➢ We are delivering the Energy Bill Support Scheme and the Alternative Payment Fund on behalf of the UK government. The scheme started
in February 2023 and runs until the end of May 2023. 
➢ The results of our Welfare Rights customer satisfaction surveys show that 99% of respondents would recommend the service.
➢ In line with Scottish Government Policy the basic pay of carers and personal assistants who look after adults in our communities were
implemented twice during the year.
Page 180

Page 181

25 
➢ We calculated and implemented contract rates for the Council’s early learning and childcare partners that enabled them to sustain their
services and pay their staff at least the Scottish Living Wage. 
Helping People Into Work
Argyll and Bute Council’s Employability Team and Third Sector delivery partners assist people into work. There are a number of programmes
available to our residents, which offer a tailored support package to suit individual needs and help participants progress towards education, training
or employment. 
There is a broad criteria for participants:
➢ Individuals between the ages of 16 and 67 years who are facing barriers in moving towards and into employment.
➢ Young people within 6 months of the school leaving date who require support to move towards and into work.
➢ Low income parents (including kinship carers) who require support to move towards, into or to increase their income in-work. 
➢ Employers looking to host a fully funded work placement or recruit someone utilising an employer recruitment incentive.
Using a holistic approach participants have access to accredited training, work placements paying the Real Living Wage, benefits, debt and fuel
poverty advice, assistance with job applications, CV creation, interviews skills and techniques. Specific items can also be purchased to remove
specific barriers, for example, a digital device to access online learning or a bicycle to help address poor transport links and allow travel to and from
work.
The following are some quotes from participants, explaining their views on the support offered and the outcome achieved.
➢ “I’m extremely grateful for the support provided by ABERTI, this gave my employer the incentive to appoint me as an adult apprentice
particularly given the additional costs associated due to my age” 
➢ “My family and I have received a lot of support since coming to Scotland. I received a bike and a laptop which has helped me work more
hours and I am able to study in my free time. I hope to start up my own business in the future. The continued support I receive from my PESF
worker is very much appreciated”
To find out more information please visit Helping people into work | Argyll and Bute Council (argyll-bute.gov.uk) 
Page 181

Page 182

26 
Corporate Outcome: People will live in safer and stronger communities 
Number of Indicators: 4 
Number on Track: 4   
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
The percentage of
groups who say their
effectiveness has
increased as a result of
capacity building by the
community development
team
75.00% 100.00% 100.00% 100.00% 90.00% G
The results are from an annual survey of customers and
community groups engaged with the Community Planning
and Community Development Team
The information provided
to our community
groups, individuals and
partners is easy to
understand
75.00% 93.00% 89.00% 96.00% 90.00% G
The results are from an annual survey of customers and
community groups engaged with the Community Planning
and Community Development Team
The total value of
compensation
settlements for vehicle
damage / driver injury as
a result of road / bridge
faults
No Target £4,307 £2,884 £2,807 £1,879 No
Target
The sums paid out have decreased year on year which may
be indicative of an improvement in road and bridge surfaces.
Percentage of adults
residents stating their
neighbourhood as a 'very
good' place to live (CSS
– survey owner)            
Awaiting Survey Launch 
Page 182

Page 183

27 
Keeping People Safe
The number of service requests received has increased by 60% post Covid pandemic, at a time when resources are limited. An exercise was
undertake to review the services response to specific service categories, and determine the most appropriate response. Given resourcing and our
legislative powers, and to identify some additional resource. These findings have been implemented.
Avian Influenza. The UK experienced its largest avian influenza outbreak in 2022 and the outbreak has continued into 2023 with outbreaks and
positive cases still being identified. Specific actions have been taken by Argyll and Bute Council to engage with commercial and domestic poultry
keepers to enhance their biosecurity arrangements and other controls, to provide advice to minimise contact with wild bird carcases which were
washed upon our coastlines, and review the Councils arrangements to respond to an avian influenza outbreak in our area.
Successful prosecution cases were prepared by the Councils Regulatory Services relating to a fatality in Loch Awe against a boat hire company,
who hired a boat from a local business (Health and Safety at Work etc. Act 1974) and for an offence against a farmer for unnecessary suffering of an
animal (Animal Health (Scotland) Act) 
The Councils internal audit team assessed the arrangements in place within the Environmental Health Service to carry out the Council’s
enforcement responsibilities under the Health and Safety at Work Act 1974.The audit opinion was “substantial”, whereby internal controls,
governance and the management of risk is sound. Three minor issues were identified and an action plan is in place to address these by the 30th
June 2022.
To ensure our residents live active and healthier lives requires us to monitor elements that can impact on overall health, work closely with our
Partners and when necessary take enforcement action. There has been in increase in Nitrogen Oxide levels as transportation has increased towards
pre-Covid levels. An air monitoring program that assesses the local air quality was completed. It concluded that local air quality in Argyll and Bute is
good and well below prescribed standards but well within national targets. 
A safer place to live, work and visit
Within the Community Safety Partnership Strategy we worked with key partners including Police Scotland, Scottish Fire and Rescue Service, HM
Coastguard, Health & Social Care Partnership (HSCP), Third Sector Interface (TSI) and local groups to bring together resources to ensure that
Argyll and Bute is a safer place to live, work and visit. 
Two examples of this is information received from Police Scotland for the group to consider appropriate safeguarding measures to support
individuals reduce their vulnerability to being drawn into terrorism and the Mentors in Violence Prevention (MVP) programme. MVP is a peer
mentoring programme that gives young people the chance to explore and challenge the attitudes, beliefs and cultural norms that underpin all forms
of gender-based violence in our society. We have a robust 3 year MVP development plan in place. This has helped to ensure strategic direction and
a focussed approach to implementation of the programme.
Page 183

Page 184

28 
The programme has faced challenges within schools in terms of having the capacity to release staff for training.  We will continue to work to develop
the number of trainers, which will help provide schools with their own internal succession plan systems.  We will also look to increase the number of
partners trained so that other services can support the programme, reducing demand on teaching staff.
Supporting Our Community Councils
Online and in person training has been delivered to over 50 community councillors. Community Councils from across the area were introduced to the
National Standards for Community Engagement and a variety of online and offline tools. 
The training lead to open and rich conversations around current practices and difficulties when engaging underrepresented groups. Conversations
covered issues such as the barriers people may face when engaging with local democracy, and the range of traditional and digital methods that
could be used to gather a diverse and representative views. 
As with most training, there were secondary benefits to both the participants and trainers, the sessions also strengthened connections and best
shared practice between Community Councils and across the authority. 
The course evaluated well and subsequently a 15 minute summary of the training was created as a YouTube video and the link was circulated to
community councillors unable to make the training, you can access the training video from this link Community Engagement for Community Councils
in Argyll and Bute - YouTube 
Other training delivered during this year by the team included: 
➢ Risk Management for Community groups 
➢ How to write an environmental policy and an action plan for your organisation 
Community Organisations Received Capacity Building Support
The Lochside Champions are a group that represent people with autism who attend the Lochside Resource Centre in Lochgilphead. The group were
supported and attended the Mid-Argyll, Kintyre and the Islands Area Community Planning Group meeting. On behalf of the group they represent
they raised a number of issues at that meeting including: 
➢ That the homes are lovely but often situated too far out of town causing feelings of isolation at times. 
➢ More work opportunities would be welcome. 
➢ The lack of transport choices in the area is constraining, this made it very hard to do things on a whim or last minute for example. 
Page 184

Page 185

29 
At the meeting the group was introduced to a key partner, the Third Sector Interface, who subsequently visited and talked to them about supported
volunteering opportunities. Another partner, Fyne Homes, has subsequently visited the group to talk about housing and donated materials for their
garden area. The group were put in touch with the strategic transport team within the Council. Work is ongoing with the group to strengthen their
governance and ensure they can fundraise and lobby effectively. 
Building Standards achieves maximum 6-year licence
Building Standards exceeded all targets for the 5 key national performance targets for 2022/23, attained one of the best customer satisfaction rates
from the national Building Standards customer satisfaction survey run by the Scottish Government and achieved the maximum six year verification
licence from the Scottish Government, which allows us to vett and verify building warrants.  This brings benefits to the built environment and
supporting our economy. During the period 2022/23 our work in supporting the economy resulted in a total 1,377 building warrants processed.
During the year there was an increase in the number of dangerous buildings complaints with occasions for emergency action to ensure that public
safety was secured. 
Short-term Lets
The Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022 required the design and development of a new Short-term Let
Licensing scheme and policy. This is to ensure short-term lets are safe, address issues faced by neighbours, enable local authorities to know and
understand what is happening in their area, and to handle complaints effectively. It also aims to balance the economic and tourism benefits from
short-term lets with the needs and concerns of local communities across Argyll and Bute.
New operational arrangements to deliver the short-term let licensing regime were developed. This included the development of procedures,
communication and engagement with the sector, an on-line information management system coupled with an online application process. 
Welcoming Ukrainian Refugees
Ukrainian refugees have been welcomed to Argyll and Bute through the Scottish and UK Government’s sponsorship in response to the invasion of
Ukraine by Russia and the evacuation of the civilian population.  
The council’s resettlement team was scaled up and the multi-agency partnership established to coordinate support.  Over 300 Ukrainians have
chosen to resettle in Argyll and Bute and the Ukrainian population is dispersed across the whole authority.  Ukrainian pupils are supported in school,
with over 100 pupils attending 23 establishments.  Ukrainian adults are supported to learn English and to move into work.  A wide variety of activities
and events have been arranged with services across the council providing support including Housing, Regulatory Services, Business Gateway,
Employability, Welfare Rights, Revenue and Benefits, Community Development, Social Work, Public Health and Education. 
Page 185

Page 186

30 
Covid Recovery Strategy
To support the process of returning to normality in response to the Covid pandemic a Recovery Strategy was developed. This led to the publication
of the Argyll and Bute Recovery document; Restart, Recover and Renew. The document focuses on a range of areas, including economic and social
recovery, building back stronger communities, public health and infrastructure. 
It also recognises the importance of economic factors in driving our recovery. A thriving local economy will underpin renewal, providing opportunities
for local people although population decline will continue to be a major factor in our capacity for recovery and renewal. 
Corporate Outcome: Children and young people have the best possible start  
Number of Indicators: 8 
Number on Track: 7 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Provide quality meals
within cost margins to all
pupils
+/-5% -0.0345 -0.069 -0.04 -2.56% G
Catering continues to perform well, with the variance from
food costs within the +/-5% target across the area. We
continue to monitor areas/locations that fall outside of the
target variance
Increase the percentage
of our care experienced
young people that have
the recommended
additional tracking and
monitoring plans in place
100.00%   100.00% 100.00% 100.00% G
Virtual Head Teacher is now in post and continues to work
on updated approaches to the monitoring, tracking and
progress of this cohort. Targets for Attainment, Exclusion
and Attendance updated and agreed with the Corporate
Parenting Board.
Percentage of children
living in poverty (After
Housing Costs)
No Target 23.30% 18.90% 21.70%   No
Target
Latest Data is 2021/22. Data is taken from the Local
Government Benchmarking Framework (LGBF). Since
2018/19 the percentage of children living in poverty has
improved against all local authorities. Latest data indicates a
relative position of 11 out of all authorities (with lowest being
best). Although we are advised to view the annual figures in
the longer term, it does appear that Argyll and Bute’s broad
Page 186

Page 187

31 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
array of tackling child poverty actions are having a positive
impact and it is important that they are maintained and built
upon.  
Our percentage rate for
attendance across all
Argyll and Bute schools
is comparable or better
than the Scottish
national average
(Biennial data)
92.00% 93.50% 93.30% 93.30% 90.55% R
This figure is taken from provisional Attendance, Absence
and Exclusions (AAE) census data and is embargoed. We
have used some basic reports from the AAE census but
have no way of checking that this is correct at this time. We
are waiting for data to be released for Director sign off and
that will be actual data. Biennial 2020/21 Data 
Support the increase in
the uptake of available
Grants, Allowance and
Entitlements
2,573 3,103 2,998 2,853 2,999 G
Education have worked with schools in relation to the take up
of EMA application and have issued individual
communications to eligible pupils.  Public notices and social
media posts have been issued to publicise other available
grants including free school meals and clothing grants
A counselling service is
available in all secondary
schools
100.00%   100.00% 100.00% 100.00% G
The new School Counselling Service delivered by The
Exchange (TCS) was launched in January 2023 and
provides 100% coverage of  services across all schools and
localities where required.  The new service offers a broader
range of delivery options than the previous service and is
currently managing demand very effectively.
The percentage of
children with no
concerns across all
domains at 27 to 30
month assessment 
82.10%  87.10% 85.50% 87.30%  No Data  G
This indicator is taken from the Local Government
Benchmarking Framework (LGBF), the latest data is for
2021/22. The Scotland wide performance for FY 2021/22 is
82.10%. Comparatively we are second highest in our Family
Group of 8 Local Authorities and one of two authorities
where performance has improved. Our performance against
the previous year has improved by 1.8% on the previous
year.
Within the HSCP Integrated Performance Management
Framework, the Child Health Measure being monitored on a
quarterly basis across Argyll and Bute HSCP is as follows:  
Page 187

Page 188

32 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Reduce the % of 27 - 30 month reviews conducted out with
the agreed time period, with a target of 90%.
95% of schools have a
suitability rating of A or B  95.00% 95.00% 95.00% 95.00% 95.00% G
All schools within Argyll and Bute currently have a condition
rating of A or B.  There are 2 schools which have a suitability
rating of C (North Bute and Tobermory). Education are
currently awaiting the outcome of a LEIP application to
support the building of a replacement school for Tobermory. 
Providing Support for All Our Learners
To ensure appropriate support is in place for all our learners, including those with the most complex needs, we have been working closely with the
CALM training organisation. This enables us to access training that helps staff understand more complex dysregulated behaviours and how to
reduce and prevent those behaviours over time. 
The training focusses on prevention and a reduction of restrictive responses. A section of the course examines best practice and trauma informed
positive behaviour support. Staff who have completed this have provided feedback regarding the positive impact that learning from the training is
already having on their practice. 
Alongside this focus on the specialised training we have updated our documentation and guidance for staff. In addition to this we have delivered staff
awareness raising sessions on the changes to this important guidance. 
Nurturing and Supporting our Young People
School staff are well equipped to adopt nurturing and trauma informed approaches to our most distressed young people. Our nurture teachers have
provided intensive, time-limited support through coaching and capacity building. This ensures that the young people who need this most are
supported. Qualitative feedback from staff in schools indicates the positive impact this work has on children, young people and staff wellbeing. 
In order to improve outcomes for children and young people a new Counselling in Schools Service was implemented. The new service is delivered
by ‘The Exchange’ (a school counselling service). Monitoring of the data and evidence gathered is showing very positive impact for children and
young people where they feel listened to and supported. 
Other notable activities are:
Page 188

Page 189

33 
➢ Additional tracking and monitoring of attendance and attainment has led to targeted support and interventions for Care Experienced Children and
young people. As a result, close analysis of the data has shown positive outcomes from the targeted support including an increase in positive
destinations to 94%, which is above our target of 85%. 
➢ A sustained low number of exclusions for care experienced children and young people continues to remain below 5. Interventions to support this
sustained low number of exclusions includes individual work with children by Health and Wellbeing Liaison Officers, School based personalised
support, Education Psychology support, health discussions and wider partnership working. 
➢ Additional resources to support the nurturing environments provided in each Early Years setting including partner providers, which in turn
enables more flexibility in how they use their environment to support self-regulation for children. 
➢ Training sessions supported 143 practitioners engaging in dialogue around infant behaviour and how to apply nurture principles to their
understanding of this. An increased number of settings reported feeling empowered by their growing knowledge around nurture to better
understand and thus support dysregulated behaviour in children. 
➢ Bespoke training to support practitioners to increase their skill and confidence in delivering play and learning outdoors was delivered. This
resulted in a better understanding of how specific outdoor environments can deliver learning for children, engages and extends children’s
thinking and supports their connection to the natural environment. The participants all reported that they felt more confident to assess risk,
engage new skills and deliver learning outdoors. 
➢ The United Nations Convention on the Rights of the Child (UNCRC) is seeing increasing demands placed on schools in relation to youth voice.
There are ongoing challenges in bringing all council departments up to speed in relation to UNCRC, and we have been working to develop a
cross-council Youth Voice structure.  The UNCRC working group is meeting regularly to address this and using framework and guidance to
inform approach.  Continued engagement in the Rights Respecting Schools (RRS) programme is helping to raise community awareness of
RRS. 
My Tribe Period Product Provision
Argyll and Bute’s My Tribe brand has been identified as an exemplar of good practice across Scotland. The success has been recognised by the
Northern Alliance who have asked the Project Lead to support the roll out to other Local Authority areas.  As well as the provision of free period
products, support has been provided in schools and Period Product Champions have been trained. There has also been engagement with
community organisations and promotion of My Tribe via Social Media channels.
Page 189

Page 190

34 
Award winning School Meals Service
We delivered over 1.2m School Meals and Early Years’ meals as well as winning the following awards -
➢ Health and Nutrition Award 2023 for our school meals drone delivery pilot
➢ Health and Nutrition Special Contribution Award 2023
➢ Cateys 2023 Public Sector Caterer Award
➢ ASSIST FM Community Focus Award 2023
Working closely with Education online payment and cashless catering was successfully rolled out to all our primary and secondary schools. This
allows online pre-ordering which enhances the service for our children and young people. It also gives parents and carers the ability to assist pupils
in ordering meals and view live fund balances for paying pupils. Importantly the system also assures the anonymity for our Free School Meal pupils.
The Catering Team won a Health and Nutrition Award for piloting the delivery of school meals via drone. The pilot was successful and will allow us to
investigate the provision of meals to our remote areas, reduce the climate impact of the service and maximise the use of technology. This pilot has
also been shortlisted for a COSLA Excellence Award 2023, with the awards ceremony taking place in September 2023.
The Council continues to offer fresh, healthy and sustainable school lunches, and holds the Soil Association Scotland’s ‘Bronze Food For Life
Served Here’ award. The award helps local authorities to source food from the local area for school meals so that children benefit from freshly
prepared, sustainable meals. The award is a widely respected and independently assessed. It is supported by the Scottish Government and
recognises Councils that serve food made from fresh ingredients, free from genetically modified ingredients and undesirable additives, using free-
range eggs and high-welfare meat. 
Taking into account feedback received from catering staff, education staff, parents and pupils, a new menu and a third meal option was implemented
for all Early Years, Primary and Secondary school pupils. The menu is compliant with the ‘Food for Life’ served here Bronze award and was
analysed in accordance with the Scottish Governments Food and Drink in Schools (Scotland) regulations 2020. The new menu is lower in sugar,
salt, red meat, processed red meat products and ensures all pupils have access to more fruits and vegetables. 
Corporate Outcome: Education, skills and training will maximise opportunities for all 
Number of Indicators: 7 
Number on Track: 6
Page 190

Page 191

35 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Maintain the percentage
of all young people
leaving school achieving
a positive destination
into further education,
training or employment *
ACADEMIC YEAR
95.00%   94.00% 93.50% 95.20% G
The Annual Participation Measure (APM) for 2022/23 was
published at the end of August 2023 and reflects as
significant increase on last year's APM of 1.7%. This figure
exemplifies that the Stretch Aim set by the Education Service
of 95% has been overtaken.
Maintain the percentage
of successful
examination
presentations in levels 4
and 5 for Literacy and
Numeracy by our senior
phase pupils *
ACADEMIC YEAR
60.00%   100.00% 97.00%
SCQF 4
87.23%
SCQF 5
66.84% 
G
The data indicates that the levels of passes in Literacy and
Numeracy is being maintained year on year, with only a 1%
difference between 2022 and 2023 in both SCQF 4 and
SCQF 5 Literacy and Numeracy, measured as detailed
above.
Increase the uptake of
wider achievement
opportunities which
complement traditional
SQA awards and offer
alternative ways to
develop learning, life and
work skills
No Target    88.00% No
Target
Enhanced Wider Achievements Programmes across all
Secondary Schools continue to be under development and
are partially supported by UKSPF funding successfully
obtained by the Education Service. 
The percentage of
Modern Apprentices that
go on to a positive
destination after
completing the Argyll
and Bute Council
Modern Apprentice
Programme
95.00% 97.40% 100.00% 96.10% 96.20% G
The progress of Modern Apprentices onward to positive
destinations remains high.  We will be investigating
expanding the reach of the Modern Apprentice programme
through forthcoming workforce planning discussions.
Page 191

Page 192

36 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
The percentage of
children that achieve
their appropriate
developmental
milestones by Primary 1
70.00%
Not
Collected
(Covid)
75.00% 64.00% 63.00% R
Moving forward, our Strategic Plan, Early Years 2023-24,
highlights collaboration with Education Scotland’s Curriculum
Innovation Team. This will facilitate ‘live’ service design
project across Early level, which will start from the adult
learners as they ask ‘why?’; scaffolding them to take a closer
look at the role of the educator within the cycle of learning,
teaching and assessment.’
The percentage pass
rate for the National 5
qualification is
comparable or better
than the Scottish
national average *
ACADEMIC YEAR
No Target 91.60% 87.50% 79.70% 77.39% No
Target
For session 2022-2023, the post-appeal National 5 pass rate
in Argyll and Bute at grades A-C is 77.39%.  The national
post-appeal data will not be made available until December
2023. 
Argyll and Bute’s pre-appeal pass rate for National 5 was
76.93%. The national pre-appeal A-C pass rate for National
5 is 78.80%. 
The percentage pass
rate for the National
Higher qualification is
comparable or better
than the Scottish
national average *
ACADEMIC YEAR
No Target 90.50% 90.20% 80.90% 77.35% No
Target
For session 2022-2023, the post-appeal Higher pass rate at
grades A-C is 77.35%.  The national post-appeal data will
not be made available until December. 
Argyll and Bute’s pre-appeal pass rate for Higher was
77.12%. The national pre-appeal A-C pass rate for Higher is
77.10%. 
Increasing Attainment at the 1st Level
Following analysis of literacy attainment data with a specific focus on children residing in quintile 1, eight schools were invited to participate and have
undertaken training in using a Quality Improvement approach to support writing attainment at 1st level. Training was originally offered by the Children
and Young People Improvement Collaborative (CYPIC) Improving Writing Programme and is now being delivered within the authority, supported by
allied health professionals and our Attainment Advisor. Data shows that attainment at 1st level within the first set of schools to undertake the training
Page 192

Page 193

37 
has increased from an average of 56.2% in 2022 to an average of 72.8% based on Feb 23 predictions. Delivery of the programme to schools in
cohort 2 has now commenced, with cohort 3 due to commence in September 2023.  
Digital Support for Schools and Learners
Digital learning is supported through the deployment of additional devices which have been provided from the digital poverty initiative. This initiative
is funded by the Scottish Government. Our most remote schools now benefit from upgrades of bandwidth and all our Primary and Secondary
schools now have Skype for Business.
We undertook a successful pilot which uses technology to help reduce and remove literacy barriers for children with additional support needs. The
pilot increased engagement in education outcomes, improved wellbeing and raised attainment levels in literacy. Children involved in the pilot are
now using a range of assistive technology more confidently and independently. The technology we piloted is Enhancing Literacy Skills for those with
Additional Support Needs using Technology (ELSAT).
Supporting Learners to Realise Their Potential
We have broadened and improved the vocational educational provision in schools, and developed strong partnerships with employers and agencies
who can contribute to the development of young people’s skills and prospects. Our Developing Young Workforce Co-ordinators have instigated and
developed partnership agreements between schools and employers, resulting in an increased number and range of work placement opportunities for
young people. In the Senior Phase (S4-S6) we have continued to develop approaches to ensure personalisation and learning choices for all pupils.
Working in partnership with Argyll College we are supporting the development of an increased choice of pathways for S4-S6 pupils which allows
them to attain their chosen positive destinations in the adult world. Twenty networked college courses now feature in Senior Phase course choices
and are available virtually to all S4-S6 pupils. Work is ongoing to extend the Senior Phase curriculum offer to include further Foundation
Apprenticeships and HNCs delivered both in schools and via partnerships. 
Leavers Positive Destinations
For the first time, we were ahead of all of our comparators for Leavers’ Positive Destinations. This is a significant achievement and one which we
hope to sustain or build on. A total of 90% of our Care Experienced Young People progressed to a positive post-school destination in 2022/23. This
is above both the Northern Alliance authorities and national figures. 
Rural Growth Deal – Skills and Training Programmes for Local People
Over £14m of Rural Growth Deal (RGD) investment will directly support skills and training programmes for local people. This includes £7m of skills
interventions to be delivered via the Rural Skills Accelerator Programme with a focus on enhancing local STEM education (Science, Technology,
Engineering, and Mathematics) tied to economic opportunities, targeted business skills interventions and enhancements to UHI Argyll’s local estate.
UHI Argyll will also invest £7.8m via the RGD to create a marine industry training centre at Dunstaffnage which will provide the skills and training
opportunities locally required by key sectors in the blue economy.  This has key synergies with other RGD projects such as the SAMS Seaweed and
Page 193

Page 194

38 
Shellfish Research & Development Centre which will enable growth in these nascent sectors alongside more established industries.  We will work
with Stirling University to expand the capacity of the Marine Environmental Research Laboratory at Marchrihanish with a focus on Research &
Development activities around fish health and environmental sustainability.  These interventions will grow opportunities for students to study locally. 
Carbon Literate Organisation (CLO) Bronze Status 
We recognise the importance of a leadership informed and knowledgeable of climate change and sustainability will improve decision making and our
ambition of becoming a net zero organisation by 2045. To support this we successfully completed a programme of Carbon Literacy Training and
obtained nationally recognised Carbon Literate Organisation (CLO) Bronze status.  The training offered to the Senior Leadership Team and
completed by over 65% of Elected Members provides detailed training around climate change decision making, evidence and science.   
Corporate Outcome: Our economy is diverse and thriving   
Number of Indicators: 12 
Number on Track: 10 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Maintain the percentage
of local suppliers that
benefit from the awards
of contracts via the
procurement portal
20.00% 27.90% 27.90% 13.50% 19.90% R
Due to the nature of the contracts awarded in 2022/23,
meant that our local supply base was unable to bid for them.
However, where the type of contracts that local suppliers are
bidding for and which contracts are subsequently awarded to
them is monitored, and 85.3% of local suppliers were
successful in winning bids
Increase the number of
community benefits that
are delivered through the
contracts we award
locally
No Target 2 22 55 73 No
Target
We have been working closely with our suppliers to deliver
additional social, economic and environmental value to our
society and 73 Community Benefits were achieved through
Contract Management, Contract Awards and the Request
List during the period from 1st April 2022 to 31st March
2023. For further detail, please visit:  https://www.argyll-
bute.gov.uk/business-and-licensing/selling-
council/procurement-useful-links-and-documents 
Page 194

Page 195

39 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Number of business and
industry planning
applications submitted
annually
No Target 25 21 19 23 No
Target
This measure details the number of applications submitted to
the Council for business and industry applications. The data
for 2022/23 indicates increased activity in this area from the
previous reporting period.
The percentage of
homeless applicants who
required temporary
accommodation this
period
No Target 44.00% 45.00% 40.00% 34.00% No
Target
The percentage reduction has to be considered in the
context of an increase of 29% in the number of households
presenting as homeless to the local authority in 2022/23
compared to 2021/22. The actual number of households
requiring temporary accommodation increased in 2022/23
but the pro- active housing advice and information provided
by the Area Teams has meant that effective prevention work
is carried out to ensure that as many households as possible
get a positive housing outcome and do not require temporary
accommodation. 
Number of affordable
social sector new builds
completed per annum
Actual 84 48 145 188 G
The Strategic Housing Investment Plan process is a
partnership between the Council, the Registered Social
Landlords and the Scottish Government ensuring that new
build affordable housing is delivered across the local
authority to meet need and demand.
The total number of
visitor trips to Argyll and
Bute (Jan-Dec, STEAM,
Million trips)
No Target 2.9M 0.8M 1.5M 2.5M No
Target
This data is taken from the Scottish Tourism Economic
Activity Monitor (STEAM) the number of visitor trips to Argyll
and Bute increased from 1.5m (Jan – Dec 2021) to 2.5m
(Jan- Dec 2022) – an increase of 67%.
The positive experience for visitors coming to Argyll and Bute
has been assisted by the actions delivered through the
Staycation agenda, which included employing a temporary
post to take forward specific actions on the ground, such as
successful completion of the Motor Caravan Overnight
Parking scheme.
The total visitor spend in
Argyll and Bute (Jan-
Dec, STEAM, Direct
visitor spend - £/M
No Target £364M £125M £262.5M £407.5M No
Target
This data is taken from the Scottish Tourism Economic
Activity Monitor (STEAM) the visitor spend across Argyll and
Bute increased from £262.5m (Jan – Dec 2021) to £407.5m
(Jan- Dec 2022) – an increase of 55%. The positive
experience for visitors coming to Argyll and Bute has been
Page 195

Page 196

40 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
assisted by the actions delivered through the Staycation
agenda, which included employing a temporary post to take
forward specific actions on the ground, such as successful
completion of the Motor Caravan Overnight Parking scheme.
Gross Value Added
(GVA) per capita No Target 22,767 20,543 23,394 47,270 No
Target
The latest figure of £47,270 is taken from the Scottish Annual
Business Statistics, 2021 (excludes the finance sector and
part of agriculture and the public sector). This is a marked
increase on the previous figure of £23,394 (statistics are in
arrears and do not match financial years). There are
potentially a number of council services/interventions that
directly or indirectly contribute to this productivity measure,
plus external factors.  
Unemployment rate -
Claimant Count as a
%age of working age
population
No Target 2.70% 5.80% 4.00% 2.80% No
Target
The Claimant Count unemployment rate is updated on a
monthly basis (one month in arrears), This figure is the
unemployment rate for Argyll and Bute as a % of working
age population (16-64). The downward trend is positive.
Unemployment rate -
Claimant Count as a
%age of the population
(16-24)
No Target 2.80% 6.50% 4.30% 2.80% No
Target
The Claimant Count unemployment rate is updated on a
monthly basis (one month in arrears) for 16-64 year olds.
This unemployment rate for the % of population, 16-24 year
olds. The downward trend is positive.
The number of business
gateway start-ups per
10,000 of population
No Target 161 110 154.3 135.7 No
Target
It is hoped this figure will improve as Argyll and Bute
Business Gateway Team recently launched a start-up grant
funded by the UK Shared Prosperity Fund. 
Geographical
percentage coverage of
4/5G mobile phone
connectivity 
95.00% 76.00% 77.00% 79.00% 81.00% R
Each mobile network operator manages their own network
as they all use different spectrum frequencies. EE has the
greatest coverage as a result of the Government backed
Emergency Service Network (ESN) contract and a very
aggressive commercial approach. They have built in excess
of 90 masts across A&B over the last 5 years.
Over the next few years there will be significant
improvements as part of the UK Government supported £1B
Shared Rural Network (SRN) due to be completed by 2027. 
Page 196

Page 197

41 
Economic Growth 
The positive experience for visitors has been assisted by the actions delivered through the Staycation agenda, which included employing a
temporary post to take forward specific actions on the ground, such as successful completion of the Motorcaravan Overnight Parking scheme.
Details on the Staycation agenda can be found in this report Staycation Update Paper 
➢ With reference to the Scottish Tourism Economic Activity Monitor (STEAM) the number of visitor trips and visitor spend increased in Argyll
and Bute. 
➢ Visitor trips increased from 1.5m (Jan – Dec 2021) to 2.5m (Jan- Dec 2022). This is an increase of 67% 
➢ Visitor spend increased from £262.5m (Jan – Dec 2021) to £407.5m (Jan- Dec 2022). This is an increase of 55%. 
Supporting the Economic Recovery and Our Communities 
The Procurement, Commercial and Contract Management Team (PCCMT) provided a strong lead to ensure we continued the percentage of Council
spend that is under a contract or service level agreement, while also maintaining the percentage of all Small Medium Enterprises (SME) that win
council contracts. We also worked to improve the delivery of contract management on all high risk contracts. 
2022/23 Contracted Spend: 90.8%. 
2022/23 SME Wins: 87.6%
We effectively planned and coordinated the release of tenders to avoid overwhelming the market, in particular the local market, by issuing invitations
to tender where the regulations allowed. For 2022/23, we awarded 152 contracts and of these 123 were Quick Quotes (ITQ’s).
The percentage of total bids by and contracts awarded to local and SME suppliers is monitored monthly. However, not all requirements can be fulfilled
by the local supply market. To gain a better understanding of performance, the number of tenders bid for, and subsequently won, by local suppliers
is also monitored and detailed below. 
Page 197

Page 198

42 
2022/23 Data
Total No. of Tenders No. of tenders receiving
local bids No. won by local bidders  Percentage success rate of
local bids won to local bids
submitted
152 34 29 85.3% 
The level of local spend was monitored in 2022/23, and the overall percentage with our local suppliers was 37.3% - see detail below: 
Total Spend Local Spend Local Spend
Percentage
2022/23 – Spend
Distribution £163,144,959 £60,856,127 37.3% 
We recognise the importance of maximising the economic benefits from directing Council spend to local businesses in terms of benefiting the local
economy. Whilst it would not be acceptable to give preference to local businesses during any particular procurement, efforts are made to ensure that
local businesses are upskilled so as to have the greatest chance of being successful in winning Council and other public sector business.
We are committed to maximising community benefits from our procurement activities which in turn deliver wider benefits for communities when
contractors purchase the required goods, services and supplies for Argyll and Bute. We have been working closely with our suppliers to deliver
additional social, economic and environmental value to our society. A total of 73 community benefits were achieved in 2022/23 through robust
contract management.
We also simplified and streamlined our procurement processes, ensuring that documentation was as straightforward as possible. To support the
economic recovery and emerging priorities for Argyll and Bute we work closely with colleagues within Economic Development and other
collaborative stakeholders.
The Rural Growth Deal (RGD) will result in contracts totalling £70m to be delivered over 10 years.  As such, there is significant opportunity to use the
RGD investment to deliver enhanced community benefits.  We are working to ensure suppliers meet their obligations with regard to community
benefits.  
Page 198

Page 199

43 
Business Start-Ups and Support – Two Case Studies
The number of business gateway start-ups has dropped slightly over the financial year, but is it hoped this will improve during 2023/24 as the Argyll
and Bute Business Gateway Team recently launched a start-up grant funded by the UK Shared Prosperity Fund.
During 2022/23 we worked hard to ensure that the financial help available to businesses was correctly awarded and quickly paid out. In total we
awarded nearly £18 million of Non-Domestic Rates reliefs to support local businesses. 
The following are two case studies illustrating how Business Gateway has supported these businesses to grow.
Aosdàna 
Based on the Isle of Iona, Aosdàna designs and manufactures contemporary jewellery with a Celtic influence. 
Business owner, Mhairi Killin, founded Aosdàna in 2003. Having operated successfully for almost two decades, most of Aosdàna’s sales were
generated from its gallery on the island, where some of the jewellery ranges are also designed and made. However, like many other small
businesses, pandemic closures and subsequent travel restrictions meant the main source of income for Mhairi dwindled.
During this time, however, Mhairi, together with award-winning jewellery designer Maeve Gillies, won an Innovate UK award to develop a range of
jewellery based on the heritage of original Iona silversmiths, the Ritchies. 
Mhairi approached Business Gateway for support and guidance on how to reach a wider audience and generate global sales for the new range, the
Kist o’ Ritchies. She received 1:1 support from a dedicated business adviser, as well as advice on funding, a strategic review of her business, and
signposting to a wider network.
“Support from Business Gateway has been so beneficial. Not only has their assistance helped me re-evaluate my business strategy, but it has also
allowed me to invest in strong product photography for my website, which will help me greatly when launching into international markets later this
year. I can’t thank Business Gateway enough for their ongoing support.”
The Kist o’ Ritchies collection utilises the latest manufacturing technology to navigate the lack of metalworking skills on the island, preserving the key
historical designs from the 19th and 20th centuries. 
The modern jewellery range will launch in spring 2023 and is expected to attract international markets including the USA and Canada. 
Argyll Yacht Rigger
A Scottish yacht servicing business in Argyll & Bute is thriving after its owner received specialist start-up advice and grant funding from Business
Gateway.
Page 199

Page 200

44 
Following redundancy during the Covid-19 pandemic, experienced rigger Ian Burton launched Argyll Yacht Rigger, in June 2020. The Tarbert-based
business provides a full range of services for pleasure and commercial yacht owners in the region, from complete re-rigs to installing new masthead
electronics and winter maintenance. 
Seeking to capitalise on this niche area of business, Ian approached Business Gateway in 2020 for advice on setting up his own business. As well
providing start up guidance, his local adviser facilitated specialist support which included employment advice and expert help on business growth
and resilience. This support was crucial as Ian looked to build the business during the pandemic. 
Business Gateway also signposted grant funding, helping Ian access financial support to expand.  This included support from the Local Growth
Accelerator Programme, funded by Argyll and Bute Council and the European Regional Development Fund (2014-20) Structural Funds Programme.
With a referral made from Business Gateway, Ian was also awarded funding from Highlands and Islands Enterprise. 
The grants enabled Ian to purchase higher-quality equipment, allowing him to deliver a wider range of services, increase capacity and cover a wider
regional area. The growth has resulted in Ian employing a second member of staff with plans to hire an additional full-time rigger this year. 
Ian said: “Starting your own business, especially in a rural area, can be daunting, however, the support of Business Gateway has been vital to a
successful launch in 2020. Working throughout the pandemic, I was determined to expand the business and it was with the funding that Business
Gateway helped me to secure that I was able to do this. I have now taken on my wife as my first employee to help with my bookkeeping, which has
been an important function for us to maximise earning hours.”
Mitigating the Delays for Taxi Licencing
As the licensing authority we must be satisfied that the health of individuals issued with a Taxi Licence to meets our expectations. In order to do this
we contact their Doctor on receipt of an application. We realised that customers were experiencing significant delays in receiving a response from
their Doctor. This in turn meant that customers could not receive their licenses timeously and therefore could not trade. This had inevitable negative
economic consequences, with the frustration experienced by our customers made clear to us, both verbally and in writing. 
We are committed to using all forms of customer interaction to help us identify possible service improvements and offer better choices. As a result of
the clear frustration described in the communication we undertook a period of consultation. We contacted all 389 private hire/taxi drivers and
operators in the area asking for their feedback on a proposed solution of engaging the services of an external agency to undertake the required
medical check.
This solution was endorsed by customers and has since been implemented, we have the required confidence to issue a taxi licence, customers do
not face delays in the processing of their applications and negative economic consequences are reduced. 
Generating Income for the Council  
We have generated over £560,000 by selling off surplus property assets and generated annual income of £31,750.  This is part of our strategy to
divest surplus property assets and generate income from our estate. 
Page 200

Page 201

45 
Notable sales include:
➢ The former Innellan Primary School 
➢ The conclusion of the Castle Toward sale
➢ The marketing of the Helensburgh Waterfront commercial site, which attracted 9 international, national and local bids for the site with a
significant local community engagement exercise undertaken. 
➢ Oban Airport marketing has generated 3 significant aviation related business interests for the business park. These will be identified with the
outline business case to be completed in 2023. 
We are developing a Strategic Outline Programme. This will cover potential opportunities for the Council to develop a number of its assets on a more
commercial basis and will be delivered over a number of years, with the immediate focus being a new Business Park at Kilmory, and commercial
developments at Helensburgh’s waterfront.
We secured ongoing commercial planning / building standards work from other local authorities. Not only is this important for us to provide a
balanced budget, but it also supports communities in these other Council areas.
Events and commercial catering continues to grow with the recent addition of a new commercial café this year -The Pier Point Café, Helensburgh
and Lomond Civic Centre in late 2022. Work is well underway to open another commercial café, the Corranbuie Café, Tarbert Holiday Park in July
2023. Event and commercial income is slowly recovering from the impact of the pandemic, with a number of large festivals and private weddings
having been hosted throughout the course of the year.
Rural Growth Deal – Two Projects Growing Visitor Numbers 
The RGD includes a tourism and place programme which will focus on 2 local projects aimed at growing visitor numbers in the region.  The Kintyre
Seasports project will regenerate Campbeltown Sailing Club to provide a facility which can grow marine based tourism activities in Kintyre.  This will
build on the successful programmes already being delivered by Kintyre Seasports which has 10% of the Campbeltown Grammar School role
enrolled.  This facility will also enable an uplift in local events such as community regattas and sailing competitions which will result in an estimated
700 more visitor trips to the local area per annum.
The RGD will also invest £9m in Rothesay Pavilion which will significantly reduce the funding gap on this project.  The Pavilion has the scale and
ambition to be transformational for Bute and will provide a key visitor attraction when complete. This will include a fully refurbished and equipped
main auditorium with sprung dancefloor and a capacity of up to 800 seated and 1200 standing; a new second venue with a capacity of 80-100; a
contemporary gallery space; shop and box office; café; two bars; meeting room; music and media education studio; and supported office space. In
addition, there will be outdoor seating and landscaped garden areas.  Programming during the high season will target visitors (short stay and day)
with festival-based and themed events and high-quality unique exhibitions. Examples will include vintage fairs, comedy weekends, beer and food
festivals, family shows, and dance holidays. These will link in with other tourism and cultural organisations on the island to ensure joined-up
experience-based and holiday focussed marketing with an emphasis on the cultural tourist.
Page 201

Page 202

46 
Rural Growth Deal – Mull Housing Pilot 
As a result of successful funding applications the progress of the Rural Growth Deal Housing Pilot has been accelerated. We are now able to press
ahead with preparations for the delivery of much needed worker housing in Tobermory, Mull. This need was initially identified by research
undertaken by the Mull and Iona Community Housing Trust. Restrictions to economic growth as a direct result of the shortage of housing for workers
were identified.  The Housing Service is working with Mull and Iona Community Housing Trust (MICHT) to devise a housing type and tenure model
which will, if successful allow MICHT to operate as managers of a bespoke property leased to them by the Council.  
This will then provide accommodation for workers in the local economy, either for seasonal work, and or a landing pad type accommodation for
those who have arrived on the island to take up permanent positions.  This is a pilot project and has the potential to be rolled out further.  A site start
is currently planned for April 2024, subject to securing the necessary planning, building control and roads consents.
Clyde Engineering and Innovation Cluster  
The Clyde Engineering and Innovation Cluster (CEIC) project will be supported with up to £7m from the UK Government. The impetus for this project
comes from the expansion of HM Naval Base (HMNB) Clyde through the Maritime Change Programme (MCP). The MCP will consolidate the UK’s
submarine fleet and all its support services to HMNB Clyde. 
The Rural Growth Deal provides a unique opportunity to support this transformational programme of change and maximise the local economic
benefits. This project will deliver new, modern commercial business space. It will also represent Phase 1 of a potential business and engineering
cluster at Colgrain Business Park near Helensburgh. 
In developing the CEIC proposals we have been working closely with key partners including the MOD, Royal Navy, Scottish Enterprise and key
industrial partners currently delivering services at HMNB Clyde.
The Rural Growth Deal investment aims to:-
➢ Maximise the economic opportunity from the £1.3bn investment into HMNB Clyde. 
➢ Secure the economic opportunity for Helensburgh and Lomond and the wider Argyll and Bute area by addressing the current lack of available
commercial accommodation. 
➢ Providing modern, commercial accommodation will support the development of engineering and supply businesses. 
West Coast Unmanned Aerial Vehicle (UAV) Logistics and Training Hub  
This project will be supported with investment of up to £4m from the UK Government subject to the approval of a full business case.
Page 202

Page 203

47 
This project will invest in new business park infrastructure at Oban Airport. Recent trials using drone’s to provide essential services to some of the
most fragile rural and island communities have been successful. The investment will enable it to become a leading innovative research and
development centre for UAV technologies.  
The centre will deliver Scotland’s first specialised drone training and research centre.  Providing enhanced Research & Development capabilities,
space for UAV pilot training, laboratories, and lecture suites. The UAV Hub will also provide state of the art hangars with maintenance facilities for
UAVs and general aviation aircraft.  Oban Airports’ position on the West Coast of Scotland will also provide enhanced capability to trial Beyond
Visual Line of Site (BVLOS) flights in controlled airspace. This will support the safe integration of UAV’s and general aviation traffic across the UK,
future-proofing our airspace for all users.
Corporate Outcome: We have an infrastructure that supports sustainable growth 
Number of Indicators: 5 
Number on Track: 5 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
The percentage of waste
that is recycled,
composted or recovered
45.00% 43.80% 49.30% 48.30% 52.00% G
There was an overall improvement in recycling performance
in 2022 which was mainly due to an increase in green
garden waste and wood waste tonnages sent by Renewi
from the PPP area for onward composting and recycling. 
There was also an improvement in recovery performance in
2022 mainly due to a trial carried out by Renewi in the PPP
area whereby Renewi sent circa 1,500 tonnes of general
mixed residual waste (mainly from their Dalinlongart waste
facility near Dunoon) to an Energy from Waste (EfW) plant in
the central belt
The number of tonnes of
waste sent to landfill
(Biodegradable) 
21,500 18,577 18,435 18,772 18,165 G 
The annual tonnage of biodegradable waste to landfill has
reduced from previous years calculation of tonnage. Based
upon the current annual tonnage, there is a significant
reduction of waste to landfill. The reduction is 3,335 tonnes
based upon the corporate level specified at 21,500 tonnes.  
Page 203

Page 204

48 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary 
Percentage of street
cleanliness 73.00% 79.00% 81.00% 79.00% 83.00% G
The level of street cleanliness throughout Argyll remains at a
very good standard on the areas which Keep Scotland
Beautiful have highlighted for inspection.  The national
standard has a pass rate of 67% however the service has set
its own target of 73% and remains well above this target.
The percentage of roads
in need of maintenance
as defined by the annual
survey
No Target 54.20% 52.50% NO DATA 49.70% No
Target
The covid-19 pandemic interrupted the 2019-20 and 2020-21
annual road condition assessment programmes which meant
island roads were unable to be surveyed. However this
year’s survey results show a marked improvement in overall
condition since the last normal survey from 54.4% to 49.8%.
The results also show, for the first time in the last 8 years of
reporting, that more than half our road network is within the
green or good condition band, which demonstrates the
success road maintenance teams have achieved across the
authority. 
Carbon emissions
relating to Council
activities (Council carbon
footprint) tCO2e =
tonnes of carbon dioxide
equivalent
Net Zero
tCO2 by
2045
28643 26619 28218 26,512  G
There has been a reduction of 1,705 tCO2e on total
emissions for the previous year.
Projects delivered by the Council that have contributed to the
reduction in emissions include:
• LED Streetlight Replacement programme 
• Solar pv and LED lighting installations at Council assets
• Installation of low carbon heating systems (e.g. air source
heat pumps) 
Flood Protection and Marine Works
We have progressed our assessments, watercourse clearance works, flood incident investigation and provision of flooding advice. A watercourse
inspector along with additional engineers have been recruited to assist the flooding team, these posts will help to deliver the council’s obligations in
terms of Flood Risk Mitigation.
Page 204

Page 205

49 
Campbeltown Flood Protection Scheme
Construction of the Campbeltown Flood Protection Scheme started on site in
September 2022.  It is the first scheme to be promoted by Argyll and Bute
Council under the Flood Risk Management (Scotland) Act 2009. Budgeted to
cost £15.215M and funded 80% by Scottish Government and 20% by Argyll
and Bute Council.
There are a number of elements to this piece of work. Essentially, surface
water has been removed from the combined foul drainage system, this
reduces the amount of water that needs to be treated in the sewage
treatment works. This required the construction of a storage tank under
Burnside Square, small ponds on the “Meadows” and the construction of a
reservoir to the south of Snipefield Industrial Estate were also required. 
These ponds and the reservoir will remain dry for the majority of the time, and
will provide holding capacity during a storm event, where water will be held
and ultimately slowly discharged into the sea. 
Both the “Meadows” and the “Burnside” sections of the work are largely complete with final works planned for Sept/October 2023. Burnside Square
is open to the public, with car parking to be available shortly. Road resurfacing is ongoing along the streets where pipework installation has been
completed. Work on the “Millknowe” section (the flood storage reservoir) is ongoing. The Contractor has completed piling works and has
substantially completed the embankment and spillway structure. The “Dalaruan Street” section (for culvert upsizing) is the final phase to commence
which will also enable utility works to commence. 
Page 205

Page 206

50 
First photo shows the reservoir which will be dry the majority of the time, only holding water during a flood event.
Second photo shows the drilling rig used to insert the steel sheet piling which forms the walls of the reservoir. 
Third photo shows Burnside Square during the construction of the tank.
Additionally we have progressed to a cloud based Flood Risk Management System which enables flooding information to be held in a safe and
appropriate format.   
Piers and Harbours 
Marine Infrastructure and Ferry Services
The restructure of our larger harbour infrastructure and reviewed legislation have led to an additional number of Piers and Harbours. Argyll and Bute
Council is the Statutory Harbour Authority at 7 locations and a marine asset owner at a further 29 marine facilities located throughout the Council
area. All remedial actions required to close out audit findings have been completed, with the ongoing audit regime visiting Rothesay later this year. 
Ferry Services
All our ferry routes operated according to timetable with additional sailings put on to cope with increased demand. We are reviewing the previous
works and studies carried out around the ferry services we provide and the infrastructure they need now and for the future.
The replacement of the Jura ferry remains the priority and work is underway towards the installation of appropriate passenger access at Feolin on
Jura. We have undertaken a topography study at Feolin with a view to tendering a design build for the passenger only access for those periods
Page 206

Page 207

51 
when the vehicular vessel is not available. This will make a very significant improvement to the connectivity issues when there is a breakdown on the
Eilean Dhiura and will likely be in the form of a gangway and pontoon near the existing slipway. 
Tobermory Wall and Rails
The council secured funding in the region of £450k to make improvements to the front rails at Tobermory Main Street and help alleviate some of the
flooding issues associated with Tobermory. A new higher wall was installed to which the upgraded rails were attached to, as well as a flood
barrier/gate and flat valves. As part of this project the council will also be making road
surfacing improvements to the area of car parking adjacent to the wall.
Design details were discussed with stakeholders to accommodate the wishes of the pier
users such as realigning the flood barrier to reduce impact to the pier stones. From this
design the council obtained a listed building consent and secured a local contractor through
the tendering process. The council has been physically supervising the site on a weekly basis
and continue to maintain contact with the affected stakeholders as such. This has enabled
revising construction sequences to address summer tourist season for directly affected
businesses. 
The majority of the works programme is targeted to be complete by December 2023 with the
flood barrier construction across Fisherman’s Pier to be completed in January/February 2024. 
Oban Harbour Revision Order
Informal discussion have been ongoing to finalise the Oban Harbour draft Harbour Revision Order (HRO). The draft HRO has undergone some
changes to the content order, formatting and points of specific interest e.g. definitions and references.
A final draft of our Harbour Revision Order for Oban was approved for submission to Transport Scotland by the Harbour Board. The formal part of
the process will now proceed, including public consultation.   
The Terms of Reference for the proposed Consultative Forums have been drawn up. These are based on the guidelines and recommendations of
the Port Marine Safety Code (PMSC). It is proposed to have two Consultative Forums. One will be a group consisting of the organisations with
financial and legal responsibility in the bay. The other will consist of the stakeholders and communities who rely on Oban Harbour. 
Recruitment has been completed to ensure a smooth first step is made in preparation for the new shift patterns once the HRO is in place. 
Page 207

Page 208

52 
Iona Slipway and Breakwater
The Breakwater planning application is progressing with a view to tender later this year. The contract is expected to be awarded summer 2024 with a
completion date of summer 2025. However, it should be noted that the present forecast of a 1 year construction period may be subject to the
contractors work scope and supply chains, particularly the rock armour. 
We have received a quote to complete the Slipway work started by the previous contractor. There are some issues to finalise which are being
addressed. Due to the nature of some issues we initially had no returns from known contractors, this can signify problems with completing the works. 
We are currently considering the issue and comments, views and thoughts from the pier users have been requested. 
Fionnphort
The work to progress key pieces of marine infrastructure to allow for full and unfettered access to and from Iona is ongoing. The Environmental
Impact Assessment is in process including the socioeconomic assessment. Work is ongoing to address the potential issues with CalMac Marine
regarding swept paths etc. Once Marine Scotland have approved the Environmental Impact Assessment we will continue with the licences, etc. with
a view to tender in the summer of 2024 approx.
Port Askaig
In April 2018, Scottish Ministers announced that Islay would be next in line for new vessels to replace the MV Hebridean Isles. As part of the New
Islay Vessels (NIV) Project, the Port is being assessed and upgraded to accommodate the larger capacity ferry with the first vessel expected to be
delivered by October 2024 and will enter service following sea trials and crew familiarisation. The second vessel will follow in early 2025. 
Land Based Developments 
Road Reconstruction
During this financial year we carried out a programme of road improvements. The Council invested nearly £10m with additional funding from the
Timber Transport Fund in the region of £1m. This allowed us to complete over 80 individual road reconstruction schemes which will improve the
overall road network, contributing to keeping Argyll and Bute open for business. As a result of this ongoing prudent investment and proportionate
and appropriate engineering choices, the overall road condition continues to improve, and we recorded the most improved road condition in over 15
years. 
Page 208

Page 209

53 
Road Condition Improvements
Continuing the trend of improvement / arresting the decline in our road network, Our Annual Status and Options Report sets out the benefits of
continued investment in our road network and highlights the critical risk of underinvestment. 
Although our network has seen a welcome improvement in recent years, we would need to spend in the region of £10-11million annually to maintain
a ‘standstill’ position, and significantly more to see continued improvements. Year on year budget consultations and public feedback has shown the
importance of roads to our communities – maintaining the required level of investment is likely to be challenging in future years given the predicted
decline in available capital funding. This brings with it significant engineering, economic, financial and reputational risks for the Council. 
We continue to deliver a range of different technical solutions that are designed to be proportionate for the use of the road and take into
consideration the island and rural geography of Argyll and Bute. 
Winter Maintenance
The council is responsible for carrying out winter maintenance, the removal of ice and snow, to its
2,300km of road. There is a network of roadside weather stations which together with specialist
forecasting surveys provide bespoke treatments across the council area utilising 32 separate routes. 
Key facts from this winter season: 
• 66 full fleet runs 
• 2,238 individual vehicle runs 
• Highest turned out route A819 Inveraray to Dalmally 
• Total distance travelled 105,902 miles 
• Salt used 12,535 tonnes 
• Total spend £2,661,350.04 
Bridge Maintenance and Renewal
We previously secured £5.5m funding through the Scottish Government Local Bridge Maintenance Fund. This was a hugely competitive fund
available to all Scottish local authorities. We received the second highest grant which allows us to replace / strengthen 9 existing bridges. To date
each bridge has been through an assessment and design process involving various stages including Ground Investigation (GI) where new bridges
are required. This GI work is being used to inform the detailed design, construction methods etc. Work will be ongoing into 2023/24 financial year
Page 209

Page 210

54 
The bridges to be replaced and the work status are:
• A849-280 Pennyghael Bridge (Feasibility Report Completed) 
• A816-120 Oude Bridge (Public Consultation in October) 
• B844-010 Kilninver Bridge (Feasibility Report Completed)
• A846-270 Glenegedale (2) Bridge (Public Consultation in October) 
Bridges to be strengthened and the work status are:
• B842-150 Whitestone Bridge (Works to be tendered Autumn/Winter) 
• B842-010 Claonaig Bridge (Under Detailed Design)
• A815-230 Cothouse Bridge (Works to be tendered Autumn/Winter) 
• B839-050 Lochgoilhead Bridge (Under Detailed Design)
• B840-140 Ardchonnell Bridge (Tender Works Awarded) 
Additionally during 2022/23 we carried out a total of 23 major maintenance schemes along with a number of minor
maintenance works on road structures. 
Claoniag Landslip
This project has been progressed by a specialised geotechnical consultant. The detailed design is slightly complex as the hill is sliding / moving
down towards the stream and therefore complicating the solution. A tender package is in the process of being developed alongside continuous
consultation with the landowner, SEPA and Openreach. There are a number of complexities affecting this project including work consents, land
acquisition and challenging ground conditions. 
In the meantime the council continues to monitor the landslide. 
Page 210

Page 211

55 
Tobermory Cemetery Expansion
There was limited burial capacity in Mull. To resolve this an £820K extension to the existing Tobermory site was constructed. This has increased the
number of lairs by 192, with each lair being 3 deep. 
Protecting the Drinking Water Supply 
In line with The Water Supply (Water Fittings) (Scotland) Byelaws 2014, Scottish
Water require a number of piers under Argyll and Bute Council ownership to be
upgraded. This is to ensure private and local public water supplies are protected
from any backflow contamination and that harbours / terminals / pontoons etc. are
adequately protected. 
We are currently working on four sites - Oban, Campbeltown, West Loch near
Tarbert and Carradale that require upgrade works. A Contractor has been
appointed and work has commenced at three of the four sites. All four sites are expected to be completed late
in 2023. 
Page 211

Page 212

56 
Deliver the ICT and Digital Strategy Action Plan - Our aims   
➢ Our networks and systems are secure, accessible and current 
➢ ICT provides value, and enables and empowers both customers and staff to make tasks easier 
➢ Our people have the knowledge and capabilities to use ICT effectively 
We continue to network and engage with Scottish Local Government Digital Office, Society For Innovation Technology and Modernisation (SOCITM)
and Scottish Government Digital Team. This engagement helps ensure that we achieve best practice, share our ICT and digital experience and
expertise, and achieve the highest levels of value for money we can through active procurement and contract management. 
The 2021-24 ICT and Digital Strategy Action Plan has approximately 100 actions. The majority of actions are progressing satisfactorily and to target.
Along with highlights noted below from the 2021-24 ICT and Digital Strategy Action Plan we have managed to maintain the average time to resolve
ICT incidents. We have operated well within our service level targets with service levels at or above previous levels and our response times were as
good as previous years.   
Microsoft365 (MS365)
We led on the national project for MS365, working with the NHS and Digital Office to provide shared MS365 calendars, address books, distribution
lists, instant messaging and presence management across NHS and Council MS365 platforms. 
Within the Council, phases 2 and 3 of the M365 project are now being implemented. A Council-wide support network of Digital Champions has been
set up to encourage more efficient and effective use of M365 across the organisation along with the introduction of an extensive M365 training
programme. 
ICT Partnership Working
We continue to work closely with the NHS to improve efficiencies and removing work barriers. Council staff now have access to the NHS ICT
system. Now both Council and NHS staff within the Health and Social Care Partnership (HSCP) have access to systems in both organisations which
greatly improves efficiencies and customer service.
We are providing an opportunity for sharing public sector resources by addressing common challenges and working together to improve outcomes
for Argyll and Bute. We continue to develop and promote the use of our #abplace2b campaign. The campaign promotes the area as a great place to
live, work; and to attract the people, skills and investment the area needs. 
We have refreshed our abplace2b.scot website and developing the use of it by our partners, for example the HSCP is using it for its recruitment
campaign. 
Page 212

Page 213

57 
We have also assisted Live Argyll with the ICT aspects of the new Helensburgh Waterfront Development (HWD). 
New Ways of Working with ICT and Data
As well as the day to day challenges of managing a high profile IT network we have implemented a raft of improvements to support working
efficiencies. These include a new self-service facility with our ICT Service Desk system and working with finance colleagues to introduce the new
Oracle Cloud financial management system 
We are currently developing and implementing a new Data Strategy. A key aim of this strategy is to evaluate, design and implement a new Data
Platform. Not only will the Data Platform enable us to measure and report on performance, importantly we will be able to combine data sets and
make better use of our data to help improve decision making at all management levels, thereby ensuring that evidence based decisions are made. 
Capital Investment and Central Repairs Delivered
We have successfully delivered a programme of capital investment totalling £7.5M. Included within the wide variety of investment projects were 50
projects relating to energy efficiency, reducing fossil fuel consumption and renewable energy generation.  This included solar panels, air source heat
pumps and new automated control systems in our buildings, mainly in our schools.   
As well as delivering the additional investment projects the emergency, planned and statutory maintenance programmes were successfully
delivered, resulting in improved customer satisfaction. Additionally a separate large-scale project reviewed the water, waste water and drainage
charges for the Council. The results of this project has delivered one-off refunds in the region of £500,000 and year-on-year savings of more than
£100,000 per annum. 
Helensburgh Waterfront Development
The new facility features a 25-metre main swimming pool and training pool, luxury health suite with steam room and sauna, a café and shop, fitness
studios and a gym with panoramic views of the Clyde.  The centre, operated by LiveArgyll, is fully accessible and includes a changing places facility,
a floating moveable floor in the training pool and poolside pods for anyone with mobility issues to access the pool independently.  
The completed leisure and public realm development was a ‘Placemaking’ finalist in the national Planning Awards 2023 and was shortlisted for ‘’Best
Construction Projects GB&I’ for the Construction Employers Federation (CEF).  
Page 213

Page 214

58 
Our Workspace – Reducing Costs and Increasing Efficiencies 
Our Modern Workspace project is progressing well. The project is reviewing how we use our workspace, reduce costs and increase efficiency. Four
Hub Buildings are now complete with two due for completion by the end of 2023. Ten under-utilised buildings have been repurposed or mothballed.
The entire project (excluding Lochgilphead) is being delivered through existing capital programme budgets and Scottish Government Place
Demonstrator Funding (£664K awarded to deliver Rothesay Project). 
The Project has delivered significant savings from rationalising shared offices through – 
➢ Non-Domestic Rates relief on the buildings that have been closed.
➢ A reduction in utility consumption. 
➢ A reduction in cleaning costs.
➢ A reduction in the number of printing devices required 
➢ A reduction in paper and the need to print as we adopt a more digital approach to Service Delivery.
➢ A Reduction in annual ICT network charges, such as ISDN lines and broadband charges.
➢ Reduced ongoing cost pressures for replacement of network equipment (Wi-Fi access points / server switches etc.), where possible network
equipment has been utilised in other locations. 
These savings and ease on cost pressures will continue to grow as the Our Modern Workplace project continues to deliver town by town 
Carbon Emissions Relating to Council Activities
In line with Government requirements, all Rural Growth Deal business cases require to include carbon management plans detailing how whole life
carbon emissions on projects will be managed throughout the lifecycle of these investments.  As such, all infrastructure delivered using Rural Growth
Deal funding will require to be designed to be as energy efficient as possible (with the fixed funds available). The  Rural Growth Deal - Programme
Management Office (PMO) also chair the National PMO Decarbonisation Sub Group which is a forum including all growth deal teams in Scotland
where best practise relating to decarbonisation and the journey towards net zero is shared This group includes policy leads from the Scottish
Government. 
Rural Growth Deal – Islay Low Carbon Project
As part of the RGD we are also developing a project for Islay with a focus on the journey towards net zero.  Due to grid constraints this has focused
on local, domestic retrofit however, there is an opportunity to work with the distilling industry to look at using £3m via the Rural Growth Deal to
undertake a larger scale project be levering private sector investment.  Bio-gas or waste heat are options being considered but this is in the early
Page 214

Page 215

59 
stages and subject to commercial sensitivities.  The Rural Growth Deal will feed into the work being undertaken as part of the Scottish Governments
Carbon Neutral Islands programme as Islay is one of six Scottish Islands included.  This will require a whole systems approach focusing on grid,
renewable energy, transport, heat, land use etc. 
Corporate Outcome: Getting It Right       
Number of Indicators: 5 
Number on Track: 4 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Increase the percentage
of all Self-Service and
automated contacts
72.00% 71.10% 71.10% 73.10% 75.00% G
The target was to achieve 72% of self service or automated
contact interactions through the Contact Centre and online
channels, and the actual final percentage was 75% (up from
73% in 2021/22), with total interactions increasing to 598K
(up from 563k in 2021/22) of which 450,440 were automated
or self-service and only 147,460 were mediated. Of the
mediated transactions, 67% were telephone calls, 14% face
to face through service points and 11% were emails
Sickness absence days
per employee (non-
teacher)
No Target 12.3 Days 10.0 Days 13.4  Days 14.3 Days No
Target
In 2022/23 LGE staff absence has increased by 0.90 work
days lost per FTE to 14.3 days.  The top three reasons for
sickness absence were 1.  Stress/Depression/Mental Health;
2.  Infections and 3.  Other Musculoskeletal Problems. From
1 July 2022 Covid absences began to be recorded under
normal sickness absence, along with no Covid restrictions it
is likely to have accounted for infections moving into the top
3 reasons for absence.  The increase in sickness absence to
beyond pre pandemic levels mirrors the national picture with
data from the Office of National Statistics which showed that
the number of working days lost hit a record high in the UK in
2022 (calendar year).
Sickness absence days
per Teacher No Target 7.7 Days 4.4  Days 5.6  Days 6.2 Days No
Target
In 2022/23 Teachers absence has increased by 0.60 of a
day to 6.2 work days lost per FTE.  The top three reasons for
sickness absence were 1.  Infections;
Page 215

Page 216

60 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
2.  Stress/Depression/Mental Health and
3.  Stomach/Liver/Kidney/Digestion.  From 1 July 2022 Covid
absences began to be recorded under normal sickness
absence, along with no Covid restrictions it is likely to have
accounted for infections moving into the top 3 reasons for
absence.  The increase in sickness absence to beyond pre
pandemic levels mirrors the national picture with data from
the Office of National Statistics which showed that the
number of working days lost hit a record high in the UK in
2022 (calendar year).
Level of employee
satisfaction TBC            Awaiting Survey Launch
Level of customer
satisfaction
92.5%
(Combined) 93.40% 95.60% 92.00% 97.60% G
The Customer Engagement Team closely monitors all
aspects of customer satisfaction across the various channels
and services used by customers and the 2022/23 outcomes
were very positive:
- The Customer Service Centre had 967 survey respondents
to its survey of telephone callers and averaged 96%
customer satisfaction
- The Registration Service had 333 respondents to its service
satisfaction survey with a 98.7% satisfaction rating
- There were 975 users of the Customer Service Points who
completed a survey and 95.8% of them were satisfied, with a
very small number of comments about walk in opening
hours. 
- The corporate website had an 86% overall satisfaction
rating with the transactional forms element being higher at
92% and the new marriage website at 96.4% of satisfied
visitors. 
Naturally all returns were analysed to determine if any
improvements were needed, but comments were
overwhelmingly positive and where staff were named the
feedback was passed on to them. 
Page 216

Page 217

61 
Responding to our Customers on Time
Where possible the Targets for Freedom of information requests, Subject Access Requests and Complaints Resolved at Stage 1 were met. All of
which have been impacted by Covid and high volumes of requests. 
Increasing the Use of our Website and Self-Service Tools 
The target to increase the percentage of all Self-Service or automated contacts through the Contact Centre and online channels was 70%. 
The actual percentage achieved was 75%, this is up from 73% in 2021/22. The total number of interactions increased to 598,000, up from 563,000 in
2021/22. 
Table showing the volume of all transactions by financial quarter during 2022/23 
Many of the automated and self-service interactions were driven by the high usage of the corporate website, which for the first time had over 4
million page views in a year and over 35,000 online forms were submitted. 
During the year the Web Team were very focused on the building of the new corporate website ready for launching in 2023/24. Even so, there was a
raft of new features and services that encouraged the continued shift to digital, including:
➢ The roll out of the online webchat bot ‘Abbot’ and Smart Assistant to all web pages which was used 5,733 times.
➢ The launch of the new Google smart speaker system, complementing the existing Alexa service. Together they have been activated by more
than 2,000 customers; largely to receive bin day related information and alerts.
➢ The creation of a range of online, interactive, cost of living support resources. These include the Scotland Loves Local Card, the Flexible
Food Fund and the preloved school uniform recycling initiative.
Page 217

Page 218

62 
➢ The continued roll out of new School websites, so much so that at year-end 43 schools have live sites with a further 22 schools at various
stages of completion.
➢ Three new online processes in relation to Primary and High School pupil registration and the Summer Schools Activities Programme.
➢ A very significant set of online resources for the new Short Term Lets licensing laws with online application form and register of applications. 
We continued the focus on making the online resources as accessible as possible. The website averaged a score of 98 out of 100 on the
independent Silktide index. This index is the global accessibility league table of all public websites. To further support access to our online resources
by our customers that have visual and language related issues we invested in upgraded “Reachdeck”, which is supported browsing technology. 
Our voice automated services also continue to be very popular with 46,000 switchboard and payment transactions totalling £1.5M were made using
the service. 
Overall the shift from expensive mediated activities to low cost digital channels in 2022/23 resulted in £940,000 worth of efficiencies, continuing to
build on the efficiencies of the previous years: 
Table showing the volume of transactions that have shifted to digital and the total value of monetary saving by financial year 
Improving Our Customer Service
Being informed and involved about issues, services and opportunities affecting them plays an important part in customer satisfaction. Officers are
supported with developing the survey content and promoting surveys on different topics. 
The Customer Engagement Team closely monitors all aspects of customer satisfaction and the 2022/23 outcomes were very positive:
➢ The Customer Service Centre had 967 survey respondents to its survey of telephone callers and averaged 96% customer satisfaction.
Page 218

Page 219

63 
➢ The Registration Service had 333 respondents to its service satisfaction survey with a 98.7% satisfaction rating.
➢ There were 975 users of the Customer Service Points who completed a survey and 95.8% of them were satisfied, with a very small number
of comments about walk in opening hours. 
➢ The corporate website had an 86% overall satisfaction rating with the transactional forms element scored 92% and the new marriage website
scored 96.4% satisfied visitors. 
All returns were analysed to determine if improvements could be made, but comments were overwhelmingly positive and where staff were named
the feedback was passed on to them.
We are continually working to improve our customer service. Both Building Standards and Legal and Regulatory Services not only achieved
reaccreditation but increased the number of Compliance Plus elements awarded. 
Other ways that we are improving our customer service experience is the digital “User forum” for Building Standards customers to highlight issues
with the service, changes to the Technical Standards, how this impacts on the customer and an opportunity to discuss their issues.
Supporting our Community Councils
We oversaw the successful delivery of Community Council Elections in October 2022.  A review of the Scheme for the Establishment of Community
Councils was also undertaken and agreed at the end of September 2022. A total of 54 of a possible 56 Community Councils are now formed and the
team attended all 54 inaugural meetings to formally set up the Community Councils. 
We continue to develop social media to help communities get the support they need, for council and communities to work together through
engagement exercises, and promoting council and area challenges and opportunities. Our combined corporate social media channels grew by 10%
last year. Our use of social media successfully signposted 80,000 people to the information they could access quickly and easily on the council’s
website. 
Local Government Elections and Supporting New Elected Councillors 
We delivered the Local Government Elections in May 2022 and the subsequent induction process for our 36 Elected Members.  These elections
resulted in a turnover of more than 50% of Members. This posed a significant challenge to ensure that all Members are prepared and able to carry
out their roles.  Along with delivering the Local Government Election in May a review of Political Management Arrangements was concluded in
advance of the new Council being elected. Post-election activities include relevant training for those appointed to the Regulatory Cohort, the Audit
and Scrutiny Committee and supporting the new Policy Leads into their roles.
The Elected Member case management system has been reviewed. This has resulted in a new, more self-service system being introduced called
“Member Zone”. The new system is more user friendly and enables our Elected Members to operate the system to manage their constituent queries. 
Page 219

Page 220

64 
Looking After our Financial Assets
➢ The Council’s Counter Fraud Team is in place in order to enhance the Council’s zero tolerance to fraud and protect the public purse. During
2022/23 the team rebilled £877k as a direct consequence of their work and have recovered £684k of that total to date. 
➢ We collected 96.72% of Council Tax exceeding the target of 96.00%. 
➢ Positive External Audit Annual Audit Report received and reported to Council in November 2022. 
➢ Financial monitoring packs and Budget Outlook were submitted to each Policy & Resources Committee. 
➢ The average investment rate for 2022/23 was 2.149% and the investments generated £2.178m of interest during the year.
➢ We processed 98.39% of invoices due within 30 days, exceeding the target of 95.5%. 
➢ The 2022/23 internal audit plan was fully completed and reported by the target date of the June Audit and Scrutiny Committee. The external
audit of the Housing Benefit subsidy claim of £16.792m was completed by the statutory deadline and an unqualified audit letter was received.
➢ The external audit of the Council’s Non-Domestic Rates Income (NDRI) Notified Return of £34.886m was completed by the statutory
deadline with an unqualified audit certificate being received. 
Retaining Our Skilled Workforce
The council is a large employer in Argyll and Bute and the majority of our workforce live in Argyll and Bute. Redundancies of council staff may
therefore affect the overall unemployment figures for our area. In 2022/23 80% of employees who were at risk of redundancy were successfully
redeployed by finding suitable alternative roles for them within the council. This helped us to keep people in employment, retained valued skills
within our workforce and saved the council £1.7million in severance costs.
Consultations – We Asked, You Said, We Did 
We want to ensure that proposed developments are what our citizens and communities want. To help us obtain your views we post our consultations
on our website. The following link will take you to the ‘closed’ consultations which relate to this reporting period. Consultation Results | Argyll and
Bute Council (argyll-bute.gov.uk)
Page 220

Page 221

Appendix 2 – Summary of Draft Council Annual Report 2022/23
1
COUNCIL ANNUAL REPORT 2022/23 (SUMMARY) 
TO VIEW THE FULL 64 PAGE REPORT PLEASE CLICK HERE 
FOREWORDS
Councillor Robin Currie, Leader, Argyll and Bute Council 
Scottish councils are living in interesting times, as the saying goes – and that has been the case for the past decade and more. Climate
change; well-documented financial challenges; the ongoing reverberation of the impact of Covid; living costs; adapting to evolving national
priorities; community aspirations and ambitions; these are just a few of the major shifts and challenges which Scottish local government has to
contend with. 
I am not, though, going to say that Argyll and Bute is no different – because we are different. We do indeed have the same larger-scale issues
to face, but we must also do so in the context of our uniqueness – our mix of remote, rural and island communities, interspersed with some
larger towns, the likes of which few other public agencies have to deal with.
And, for Argyll and Bute, there are some characteristics which remain constant and which give us the ability to evolve, to innovate, to learn, to
improve, to respond, to take action, to prepare, even when so much of the local government landscape around us is shifting at pace. 
In this Annual Report for Argyll and Bute Council, 2022/23, you will find more about these hallmarks of Argyll and Bute Council’s approach, and
how they are helping us to make the most of new opportunities and deal with existing and emerging challenges. 
Our track record in efficient financial management has, yet again, allowed us to continue to invest in the key areas of council business which
mean the most to our communities and help us to secure success now and in the future. At the same time, we have been able to minimise the
impact on jobs and services. The sterling efforts of our dedicated, agile, committed workforce are key in all of this and none of it would be
possible without them. 
No council can resist change – but here in Argyll and Bute we are working hard to make change work for our communities who depend on our
core services. We rely on our proven strengths – like good partnership working and financial prudence – and we strive for improvement, making
space to learn and ensuring we stay flexible and innovative in such a rapidly changing national environment. 
This latest Annual Report highlights many of the success stories we have been able to tell over the last year, about why Argyll and Bute is such
a great place to live, to work, to do business, to be. It sets the scene for our continued growth and improvement in years to come – and building
on what we’ve achieved this year increases our determination, our drive, our ambitions for Argyll and Bute’s future success. 
Page 221

Page 222

Appendix 2 – Summary of Draft Council Annual Report 2022/23
2
Pippa Milne, Chief Executive, Argyll and Bute Council 
It is with pleasure that we present the Argyll and Bute Council Annual Report for the financial year 2022/23. This report provides overview of
your council's activities, achievements, and challenges over the past year. As we navigate through the evolving landscape of local government
and strive to meet the needs of our diverse and vibrant communities, this document offers transparency into our actions and progress toward
the collective goals we have set for the region.
The past year has been marked by unprecedented challenges, from the cost of living crisis to economic uncertainties, and through-out this it
has been a time of resilience, adaptation, and innovation for Argyll and Bute. 
In this report we provide examples of our achievements and these efforts would not have been possible without the dedication of our council
members, employees, and the active engagement of our community members.
As we move forward into the next year, we acknowledge that our work is ongoing. Challenges persist, and new opportunities continue to
emerge. Yet, with the same determination and collaborative spirit that has defined our council, we remain steadfast in our dedication to building
a stronger, more inclusive, and sustainable future for all who call Argyll and Bute home.
We invite you to explore this annual report and gain insights into our journey over the past year. Your feedback and support are crucial to our
success, and we look forward to continued engagement as we work together to create a brighter tomorrow for Argyll and Bute. 
Financial Statement 
In 2022/23 the budget gap was £2.221m, prior to any measures to balance the budget, rising to over £37m over a five year period, with
decisions made to bridge the 2022/23 gap, reduce future year pressures and protect vital services. 
Furthermore, when agreeing the 2022/23 budget, the Council committed investment in key Council priorities including: 
• £2.653m to undertake improvements and repairs to the Roads network
• £1m to help safeguard and support future funding for Argyll and Bute’s Learning Estate Investment Programme
• £0.500m investment in Climate Change Projects
• £0.500m for active travel through further improvements of footpaths and supporting safer routes to schools.
• £0.300m to deliver a programme of street lighting
• £0.165m investment in third party organisations who support our Communities 
• £0.100m invested in a litter bin replacement programme
• £0.100m to support Staycation investment
Page 222

Page 223

Appendix 2 – Summary of Draft Council Annual Report 2022/23
3
Over the course of 2022/23 the Council allocated over £4.3m to Council Tax accounts to support people through the cost of living crisis,
awarded nearly £18m of non-domestic rates reliefs to support local businesses, paid almost £660k in Scottish Welfare Fund grants to support
vulnerable people and over £800k of Discretionary Housing payments were distributed to households in need. During the year the Council
also continued to pay grants to cover food and fuel for people in poverty and successfully referred them for support to advice agencies
resulting in maximised benefit income and reduced fuel costs of over £2.5m by the end of the 2022/23. 
Our Performance 
2022/23 is the first year that the 47 Corporate Outcome Indicators have been used. Due to the nature of the change it is not possible to draw a
direct comparison to previous years’ performance however, where possible historic data is used to help identify the overall trend and progress
on delivering our Corporate Outcomes. 
Where appropriate a Target is used to track Performance and progress is identified using a Red or Green status indicator to track performance.
Not all indicators have a Target, where this is the case the trend data is helpful for scrutiny. 
For the majority of indicators the data is collected and presented annually, or even quarterly if this is possible and appropriate. However, in
some cases the nature of the indicator means the collection of data results in a longer lag-time, or the data is collected biennially. 
The following table illustrates how we have delivered on each of our Corporate Outcomes. This is followed by the detailed performance and
supporting commentary for our Corporate Outcome Indicators. 
Page 223

Page 224

Appendix 2 – Summary of Draft Council Annual Report 2022/23
4
Corporate Outcome Number Of
Indicators
Number On Track / Above
Target / No Target With
Improving Performance
Number Off Track /
Under Target / No
Data 
People live active, healthier and independent lives 6 4 2
People will live in safer and stronger communities 4 3 1
Children and young people have the best possible start 8 7 1
Education, skills and training maximise opportunities for all 7 6 1
Our economy is diverse and thriving 12 10 2
We have an infrastructure that supports sustainable growth 5 5 0
Getting It Right 5 4 1
TOTALS  47 39 8 
DELIVERING OUR OUTCOMES 
Corporate Outcome – People Live Active, Healthier and Independent Lives
1. A total of £659,812 in Scottish Welfare Fund grants were paid to support vulnerable people.
2. A total of £804,839 of Discretionary Housing Payments was distributed to household in need.
3. During the year a total of 1,810 families have been supported to maximise benefit income and reduced fuel costs to the value of £2.527m.
4. We allocated £4.3 million to Council tax accounts to support people with the cost of living crisis.
5. We calculated and implemented contract rates for the Council’s early learning and childcare partners that enabled them to sustain their services and
pay their staff at least the Scottish Living Wage. 
6. Argyll and Bute Council’s Employability Team and Third Sector delivery partners assist people into work. 
Page 224

Page 225

Appendix 2 – Summary of Draft Council Annual Report 2022/23
5
Corporate Outcome - People Will Live In Safer and Stronger Communities
1. Online and in person training has been delivered to over 50 community councillors.
2. Building Standards exceeded all targets for the 5 key national performance targets for 2022/23
3. New operational arrangements to deliver the short-term let licensing regime were developed.
4. Over 300 Ukrainian refugees have been welcomed to Argyll and Bute through the Scottish and UK Government’s sponsorship 
Corporate Outcome – Children and Young People Have the Best Possible Start
1. In order to improve outcomes for children and young people a new Counselling in Schools Service was implemented. 
2. A sustained low number of exclusions for care experienced children and young people continues to remain below 5.
3. Bespoke training to support practitioners to increase their skill and confidence in delivering play and learning outdoors was delivered.
4. Argyll and Bute’s free period provision ‘My Tribe’ brand has been identified as an exemplar of good practice across Scotland.
5. We won the Health and Nutrition Award 2023 for our school meals drone delivery pilot. 
Corporate Outcome - Education, Skills and Training Maximise Opportunities for All
1. Eight schools have undertaken training and participated in using a Quality Improvement approach to support writing attainment at 1st level. 
2. Digital learning is supported through the deployment of additional devices which have been provided from the digital poverty initiative. 
3. Twenty networked college courses now feature in Senior Phase course choices and are available virtually to all S4-S6 pupils.
4. We were ahead of all of our comparators for Leavers’ Positive Destinations. A total of 90% of our Care Experienced Young People progressed to a
positive post-school destination.
5. Over £14m of Rural Growth Deal (RGD) investment will directly support skills and training programmes for local people. 
Corporate Outcome - Our Economy Is Diverse and Thriving
1. The positive experience for visitors has been assisted by the actions delivered through the Staycation agenda.
2. A total of 73 community benefits were achieved in 2022/23 through robust contract management.
3. We have generated over £560,000 by selling off surplus property assets.
4. We secured ongoing commercial planning / building standards work from other local authorities. 
Page 225

Page 226

Appendix 2 – Summary of Draft Council Annual Report 2022/23
6
Corporate Outcome - We Have An Infrastructure That Supports Sustainable Growth
1. We have progressed our assessments, watercourse clearance works, flood incident investigation and provision of flooding advice.
2. Construction of the Campbeltown Flood Protection Scheme started on site in September 2022.  
3. All our ferry routes operated according to timetable with additional sailings put on to cope with increased demand.
4. During this financial year we completed over 80 individual road reconstruction schemes.
5. A total distance of 105,902 miles was travelled during our Winter Maintenance Programme.
6. We led on the national project for MS365, working with the NHS and Digital Office.
7. The completed Helensburgh Waterfront Development was a ‘Placemaking’ finalist in the national Planning Awards 2023 and shortlisted for ‘’Best
Construction Projects GB&I’ for the Construction Employers Federation. 
Corporate Outcome - Getting it right
1. The shift from expensive mediated activities to low cost digital channels in 2022/23 resulted in £940,000 worth of efficiencies.
2. Our combined corporate social media channels grew by 10% last year.
3. Our use of social media successfully signposted 80,000 people to the information they could access quickly and easily on the council’s website.
4. We collected 96.72% of Council Tax exceeding the target of 96.00%. 
5. We processed 98.39% of invoices due within 30 days, exceeding the target of 95.5%.
SIGNIFICANT CHALLENGES DURING 2022/23 
1. There is a national shortage of qualified professionals. We also experience difficulties in recruiting and retaining staff in the catering, cleaning and
some areas of our Roads and Infrastructure Service.
2. The need for staff agility to being able to deliver unplanned demands.
3. Electrical grid limitations in terms of capacity/constraints continue to impact in terms of resilience and being able to deliver renewable solutions.
4. We need to ensure we are prepared to respond to a suspected or confirmed public health incident.
5. The Cost of Living Crisis impacts on our ability to deliver services across all service areas.
6. Large financial projects require staff resources from various teams across the Council. This puts pressure on our already stretched staff resources with
no additional funding for additional posts.
7. The major rise in the levels of risk associated with cyber-attacks means the need for our ICT teams to be ever more vigilant and responsive has never
been greater.
8. The Biodegradable Municipal Waste (BMW) ban is due for introduction in January 2026. This will affect the current waste collection and disposal
methods. 
Page 226

Page 227

Appendix 2 – Summary of Draft Council Annual Report 2022/23
7
CONSULTATION AND ENGAGEMENT - WE ASKED, YOU SAID, WE DID…. 
To help with improvements we conducted a number of consultations and surveys. Here you can view the surveys undertaken. Consultation Results |
Argyll and Bute Council (argyll-bute.gov.uk) 
Page 227

Page 228

This page is intentionally left blank

Page 229

ARGYLL AND BUTE COUNCIL                       COUNCIL
DEVELOPMENT AND ECONOMIC GROWTH          22 FEBRUARY 2024 
SCOTTISH GOVERNMENT CALL FOR NEW NATIONAL PARK NOMINATIONS 
1.0 EXECUTIVE SUMMARY 
1.1 The Scottish Government has announced its intention to designate a new
National Park(s) during 2026. Early stages of the process for selecting new
National Park(s) involved development of the assessment criteria and informal
expressions of interest and this occurred during 2023.   
1.2 During the spring of 2023, Policy Leads ELT were appraised of the process. 
Following that a Briefing Report was considered by PPSL on the 24th May 2023  
( May 2023 PPSL Brief ) which explained the forthcoming process and the likely
issues which might need to be considered if a National Park was to be proposed
by a local community group (see Appendix 2). The report outlined that, if a local
group made formal proposals for a National Park within Argyll and Bute, the
Council would need to consider if it wished to support that proposal or not. The
report highlighted that it would be useful to raise awareness of the Scottish
Government process by publicising the opportunity for communities to develop
and pursue their own proposals.  This was carried out by issuing a press release
at the time.
1.3 The formal nomination process was opened by the Scottish Government on
October 12th 2023 and runs until the 29th February 2024.  Until January 2024, no
Councillor nor community group had provided details of any proposed National
Park within Argyll and Bute.  Officers were aware of interest in the Loch Awe area
and requested details for consideration.  On the 20th January 2024, officers
received details of a proposal for a National Park around Loch Awe.  A website to
support this has been created www.lochawenationalpark.scot.  At this late stage
it is not possible for the Council to take a considered view of the implications of
the proposal and whether the Council wishes to support it or not.  Notwithstanding
this, the Council will be consulted by Scottish Government as part of the
assessment process and will get opportunity to express its views at that stage. 
RECOMMENDATIONS 
It is recommended that Council:
Page 229 Agenda Item 14

Page 230

i. notes the information in the Report; and
ii. notes that should a National Park within Argyll and Bute be proposed as part
of the nominations process, the Council will get opportunity to express its
views on such a proposal as part of the assessment process.    
Page 230

Page 231

ARGYLL AND BUTE COUNCIL                       COUNCIL
DEVELOPMENT AND ECONOMIC GROWTH          22 FEBRUARY 2024 
SCOTTISH GOVERNMENT CALL FOR NEW NATIONAL PARK NOMINATIONS 
2.0 INTRODUCTION 
2.1. The Scottish Government wishes to establish at least one new National Park by
2026.  This paper provides an update of the process to date, notes that to date
no Councillor or Community Group has proposed a National Park within Argyll
and Bute, and outlines the forthcoming assessment process for any potential
National Park nominations, and that the Council will be consulted as part of that
process. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Council:
i. notes the information in the Report; and
ii. notes that should a National Park within Argyll and Bute be proposed as part
of the nominations process, the Council will get opportunity to express its
views on such a proposal as part of the assessment process.  
4.0 DETAIL 
Context
4.1 The Scottish Government has announced its intention to designate a new
National Park(s) during 2026. A new overarching purpose for Parks of “leading
nature recovery and a just transition to net zero” has also been proposed. The
2000 Act allows for the possible designation of land-based National Parks and
coastal and marine National Parks. 
4.2 The first two National Parks designated in Scotland were Loch Lomond and the
Trossachs National Park in 2002 and the Cairngorms National Park in 2003. The
aims of these parks are to:
• conserve and enhance the natural and cultural heritage of the area;
• promote the sustainable use of the natural resources of the area; 
Page 231

Page 232

• promote understanding and enjoyment (including enjoyment in the form of
recreation) of the special qualities of the area; and 
• promote the sustainable social and economic development of the area’s
communities.
It is important to note that the aims for the original parks are wider than just the
natural environment, also covering cultural heritage and sustainable economic
development. 
4.3 The Scottish Government may introduce differences between the approach to
existing and new National Parks. For example, it has already stated that new
National Parks will be treated differently to the existing Parks in respect of National
Planning Framework 4 (NPF4) policy for onshore wind. To ensure any new
National Park addresses the climate emergency and supports progressive
development, the Scottish Government propose to develop new bespoke
planning policy on onshore wind to be applied in new National Parks. 
Process
4.4 Early stages of the process for selecting new National Park(s) involved
development of the assessment criteria and informal expressions of interest and
this occurred during 2023.  There is a commitment to an open, transparent and
bottom-up nomination process for selecting new National Park areas and it is
proposed that the nominations will be assessed through a non-statutory
evaluation framework.  The stages and timing of the process are set out in
Appendix 1. 
4.5 During the spring of 2023, Policy Leads ELT were appraised of the process. 
Following that a Briefing Report was considered by PPSL on the 24th May 2023 (  
May 2023 PPSL Brief ) which explained the forthcoming process and the likely
issues which might need to be considered if a National Park was to be proposed
by a local community group (see Appendix 2). The report outlined that, if a local
group made formal proposals for a National Park within Argyll and Bute, the
Council would need to consider if it wished to support that proposal or not. The
report highlighted that it would be useful to raise awareness of the Scottish
Government process by publicising the opportunity for communities to develop
and pursue their own proposals.  This was carried out by issuing a press release
at the time. 
4.6 The formal nomination process was opened by the Scottish Government on
October 12th 2023 and runs until the 29th February 2024. Information on how to
nominate a location and the subsequent appraisal process has been made
available on the Scottish Government website. 
Known interest within Argyll and Bute 
4.7 It is noted that no councillor, has approached Development Policy regarding a
potential area for nomination within Argyll and Bute following on from the PPSL
paper raising awareness of the issue and further publicity. Therefore no early
consideration has been given to potential areas.
Page 232

Page 233

4.8 Until January 2024, no Councillor nor Community group proposed a National
Park within Argyll and Bute.  Officers were aware of interest in the Loch Awe
area, and had requested details of any proposal.  On the 20th January 2024
Council officers received details of  a community group’s proposal for a
National Park around Loch Awe.  A website to support this has been created
www.lochawenationalpark.scot.  It is assumed that a formal submission to
Scottish Government will be made by the group.  At this late stage and before
the end of the nominations period on 29th February 2024, it is not possible for
the Council to take a considered view of the implications of the proposal and
whether the Council wishes to support it or not.  Notwithstanding this, the
Council will be consulted by Scottish Government as part of the assessment
process and will get opportunity to express its views at that stage. 
4.9 Officers are aware of groups outside Argyll and Bute that have expressed interest
and these include: Galloway, Scottish Borders, Tay Forest, Lochaber, Eilean a’
Cheo (Skye and Raasay), Affric to Alladale, Glen Affric, The Lammermuirs and
Largo Bay. Officers are not aware if formal nominations to Scottish Government
have been made by any of these groups to date. 
Next Stage of Nominations Process 
4.10 An appraisal framework (website) will be used to help assess nominations and to
inform the decision of Scottish Ministers on which area(s) will be progressed to
designation. The broad selection criteria that will be used to help assess
nominations for new National Parks are:
• outstanding national importance
• size, character and coherence
• meeting the special needs of the area
• strategic contribution
• visitor management and tourism
• local support 
4.11 Another factor that will be considered is the compatibility of the proposed area
with the application of regulatory frameworks surrounding existing and planned
projects and activities for the area. This will help assess the impact of National
Park designation on existing and proposed projects in that area, as the regulatory
framework may change following designation which could then lead to issues with
the delivery of projects. 
4.12 The nomination and appraisal process timeline is set out in Appendix 1. Any 
proposal received with Scottish Government by the 29th February, will be sent to
every local authority that has an area or part of an area within which the proposal
relates. This will be undertaken as part of an investigation in to each proposal
carried out by a DPEA Reporter. Local authorities that have a new proposed
National Park in their area require to be consulted as part of the investigation as
well as local communities. A recommendation will be provided by the Reporter to
Scottish Ministers regarding the area which it is proposed should be designated
as a National Park, the desirability of designating the area in question as a
Page 233

Page 234

National Park, the functions which it is proposed the National Park authority for
the Park should exercise (including planning), the likely annual costs and capital
expenses of the authority in exercising its functions and any other relevant
matters. The reporter's report will then be published and laid before Parliament
upon completion. Scottish Ministers may decide to make a "designation order"
following the process. This will include sending a copy of the draft designation
order to every local authority within the proposed area, laying the proposed draft
order before parliament, publicising the draft order and holding a further phase of
consultation on the draft order. 
4.13 It is worth noting that any proposal that receives insufficient local support will not
be taken forward. 
4.14 If following the closure of the nominations period a community group has
nominated an area of Argyll and Bute as a proposed National Park, then the
Council will be notified as part of the formal assessment process.  Officers will
report to Council at that stage with an assessment of the proposal so that the
Council can consider if it wishes to support the proposal or not, and any other
views it wishes to express. 
5.0 CONCLUSION
5.1 The Scottish Government process for creating a new National Park is underway,
and the nominations period is currently live until 29th February.  If after the closure
of the nominations period, any proposal for a National Park has been made within
Argyll and Bute, the Council will be notified of such.  At that stage, officers will
report to Council with an assessment of the proposal so that Council can express
its views on the matter. 
6.0 IMPLICATIONS
6.1 Policy – None as a result of this paper, which raises awareness of the National
Park nomination process. However, the designation of a new National Park in
the Argyll and Bute Council Area would have policy implications. 
6.2 Financial – None as a result of this paper. The designation of a National Park
would have financial implications.  At this stage these cannot be estimated. 
6.3  Legal – None as a result of this paper. The designation of a new National Park
in the Argyll and Bute Council area would have legal implications. 
6.4  HR - None
6.5  Fairer Scotland Duty: The Scottish Government are seeking nominations for a
new National Park from within local communities and it is for local groups and
organisations, which could include a Local Authority, to submit a nomination
for their area. National Parks can bring significant benefits and opportunities
to an area, but it is for those nominating locations to explore whether these
may outweigh any potential disadvantages. 
Page 234

Page 235

6.5.1   Equalities - protected characteristics – Should be considered as part of
the nominations process. 
6.5.2   Socio-economic Duty – Should be considered as part of the
nominations process. 
6.5.3  Islands - Should be considered, where relevant, as part of the
nominations process.
6.6 Climate Change – The important role of National Parks may play in tackling
the climate and biodiversity crisis is noted. 
6.7 Risk –The full implications of a the selection of a new National Park within the
Argyll and Bute Council area are currently uncertain and would require detailed
discussions between the Council and Scottish Government should such an
area be selected. 
6.8  Customer Service – The Council should support data requests, as appropriate,
in relation to the Scottish Government National Park nominations process.
6.9  Rights of the Child (UNCRC) – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Policy Lead for Planning and Regulatory Support, Councillor Kieron Green
10th January 2024                                                
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
fergus.murray@argyll-bute.gov.uk 
Matt Mulderrig, Development Policy and Housing Manager 
matt.mulderrig@argyll-bute.gov.uk 
Sybil Johnson, Senior Planning and Strategies Officer 
sybil.johnson@argyll-bute.gov.uk 
APPENDICES
Appendix 1 National Park Designation Timetable
Appendix 2: Summary of main points relating to National Park designation raised
during the Proposed Local Development Plan 2 Main Issues Report consultation 2017  
Page 235

Page 236

Appendix 1 National Park Designation Timetable 
New National Park(s) Indicative timeline
Milestone Timescale (indicative)
Public Consultation – (The Future of
National parks in Scotland)
Late Spring 2022 – completed
Public Consultation –  Approach and
Criteria of National Parks in Scotland
Autumn 2022 – Winter 2022/3 –
completed
Development of Evaluation Framework
and any legislative changes required
(including public consultation)
Winter 2022 – Summer 2023
Nominations and Assessment of
proposals for New National Park(s)
October 2023 – February 2024 
Deadline for nominations 29th February 2024
Appraisal of nominations Spring 2024
Decision and announcement by Scottish
Ministers of area(s) to be progressed as
'National Park proposal(s)
Summer 2024
Reporter investigation Summer 2024 Onwards
Designation process – Subject to
Parliamentary approval
Following investigation 
Page 236

Page 237

Appendix 2 Summary of main points relating to National Park designation raised
during the Proposed Local Development Plan 2 Main Issues Report
consultation 2017 
• Control and governance 
o Island circumstances
o Scale and nature of management required
o Planning powers – different models
• Other designations
o Regional Parks
o Marine Protected Areas or other nature designations
o Role of other agencies e.g. Argyll and the Isles Strategic Tourism
Partnership
• Need for further information to make an informed decision. 
o Explore the potential/aspirations with key stakeholders and
communities.
o Understanding of the special qualities and needs of the area
o Impacts on repopulation and tourism
o Outcomes in current National Parks
• Economy
o Potential for economic growth, including tourism
o Potential impacts on existing economic activities; in particular
distilleries, fishing, energy, farming, forestry, aquaculture and
manufacturing industries
o Fit with growth agenda e.g. Tobermory - Oban - Dalmally growth
corridor
• Renewables
o Impact on renewable industries
• Environmental issues have been raised:- 
o Environmental protections are already in place/additional safeguards
o Argyll and Bute has internationally important marine and land
environments
o Impact of increased tourism on natural assets
• Social 
o Population impacts
o Job impacts – growth some areas, restrictions others
o Potential impact on affordable housing
o Benefits of environmental management for local communities
o Need for strong local backing
• Finance
o Additional costs
o Additional funding
o Additional pressures on infrastructure