Council Annual Report
2022 - 2023

Page 2

2 
Contents
Forewords ................................................................................................................................................................................................... 6
Leader of the Council ............................................................................................................................................................................. 6
Chief Executive ...................................................................................................................................................................................... 7
Financial Statement ............................................................................................................................................................................... 7
Cross-cutting Strategic Activities ................................................................................................................................................................. 8
Changing How We Work – Our Change Programme ........................................................................................................................... 8
Working Together To Alleviate Child Poverty...................................................................................................................................... 9
Rural Growth Deal ................................................................................................................................................................................ 10
Climate Change .................................................................................................................................................................................... 11
Best Value Improvement Action Plan 2020-2023 ............................................................................................................................... 12
Audit Recommendations ..................................................................................................................................................................... 12
Strategic Risk Register ........................................................................................................................................................................ 12
Operational Risk Register ................................................................................................................................................................... 13
Significant Challenges ......................................................................................................................................................................... 13
Complaints ............................................................................................................................................................................................ 17
Absence ................................................................................................................................................................................................ 17
Quality Conversations ......................................................................................................................................................................... 20
Our Performance ...................................................................................................................................................................................... 20
Our Corporate Outcomes .................................................................................................................................................................... 20
Performance Management Improvements ......................................................................................................................................... 21
Delivering On Our Outcomes - Corporate Outcome Indicators ....................................................................................................... 21
How We Compare Nationally – Local Government Benchmarking Framework (LGBF) ................................................................. 22
Delivering Our Outcomes - Key Successes by Corporate Outcome ......................................................................................................... 23

Page 3

3 
Corporate Outcome: People live active, healthier and independent lives ...................................................................................... 23
Supporting people to deal with their financial problems ....................................................................................................................................... 24
Helping People Into Work ................................................................................................................................................................................... 25
Corporate Outcome: People will live in safer and stronger communities ....................................................................................... 26
Keeping People Safe .......................................................................................................................................................................................... 27
A safer place to live, work and visit ..................................................................................................................................................................... 27
Supporting Our Community Councils .................................................................................................................................................................. 28
Community Organisations Received Capacity Building Support .......................................................................................................................... 28
Building Standards achieves maximum 6-year licence ........................................................................................................................................ 29
Short-term Lets ................................................................................................................................................................................................... 29
Welcoming Ukrainian Refugees .......................................................................................................................................................................... 29
Covid Recovery Strategy .................................................................................................................................................................................... 30
Providing Support for All Our Learners ................................................................................................................................................................ 32
Nurturing and Supporting our Young People ....................................................................................................................................................... 32
My Tribe Period Product Provision ...................................................................................................................................................................... 33
Award winning School Meals Service .................................................................................................................................................................. 34
Corporate Outcome: Education, skills and training will maximise opportunities for all ............................................................... 34
Increasing Attainment at the 1st Level ................................................................................................................................................................. 36
Digital Support for Schools and Learners ............................................................................................................................................................ 37
Supporting Learners to Realise Their Potential ................................................................................................................................................... 37
Leavers Positive Destinations ............................................................................................................................................................................. 37
Rural Growth Deal – Skills and Training Programmes for Local People .............................................................................................................. 37
Carbon Literate Organisation (CLO) Bronze Status ............................................................................................................................................ 38
Corporate Outcome: Our economy is diverse and thriving .............................................................................................................. 38
Economic Growth ................................................................................................................................................................................................ 41

Page 4

4 
Supporting the Economic Recovery and Our Communities ................................................................................................................................. 41
Business Start-Ups and Support – Two Case Studies ...................................................................................................................................... 43
Mitigating the Delays for Taxi Licencing .............................................................................................................................................................. 44
Generating Income for the Council ...................................................................................................................................................................... 44
Rural Growth Deal – Two Projects Growing Visitor Numbers .............................................................................................................................. 45
Rural Growth Deal – Mull Housing Pilot .............................................................................................................................................................. 46
Clyde Engineering and Innovation Cluster .......................................................................................................................................................... 46
West Coast Unmanned Aerial Vehicle (UAV) Logistics and Training Hub ........................................................................................................... 46
Corporate Outcome: We have an infrastructure that supports sustainable growth ...................................................................... 47
Flood Protection and Marine Works .................................................................................................................................................................... 48
Piers and Harbours ............................................................................................................................................................................................. 50
Land Based Developments ................................................................................................................................................................................. 52
Deliver the ICT and Digital Strategy Action Plan - Our aims ................................................................................................................................ 56
Microsoft365 (MS365) ......................................................................................................................................................................................... 56
ICT Partnership Working ..................................................................................................................................................................................... 56
New Ways of Working with ICT and Data............................................................................................................................................................ 57
Capital Investment and Central Repairs Delivered .............................................................................................................................................. 57
Helensburgh Waterfront Development ................................................................................................................................................................ 57
Our Workspace – Reducing Costs and Increasing Efficiencies ........................................................................................................................... 58
Carbon Emissions Relating to Council Activities ................................................................................................................................................. 58
Rural Growth Deal – Islay Low Carbon Project ................................................................................................................................................... 58
Corporate Outcome: Getting It Right .................................................................................................................................................. 59
Responding to our Customers on Time ............................................................................................................................................................... 61
Increasing the Use of our Website and Self-Service Tools .................................................................................................................................. 61
Improving Our Customer Service ........................................................................................................................................................................ 62

Page 5

5 
Supporting our Community Councils ................................................................................................................................................................... 63
Local Government Elections and Supporting New Elected Councillors ............................................................................................................... 63
Looking After our Financial Assets ...................................................................................................................................................................... 64
Retaining Our Skilled Workforce ......................................................................................................................................................................... 64
Consultations – We Asked, You Said, We Did .......................................................................................................................................... 64

Page 6

6 
Forewords 
Leader of the Council 
Scottish councils are living in interesting times, as the saying goes – and that has been the case for the past decade and more. Climate change;
well-documented financial challenges; the ongoing reverberation of the impact of Covid; living costs; adapting to evolving national priorities;
community aspirations and ambitions; these are just a few of the major shifts and challenges which Scottish local government has to contend with. 
I am not, though, going to say that Argyll and Bute is no different – because we are different. We do indeed have the same larger-scale issues to
face, but we must also do so in the context of our uniqueness – our mix of remote, rural and island communities, interspersed with some larger
towns, the likes of which few other public agencies have to deal with.
And, for Argyll and Bute, there are some characteristics which remain constant and which give us the ability to evolve, to innovate, to learn, to
improve, to respond, to take action, to prepare, even when so much of the local government landscape around us is shifting at pace. 
In this Annual Report for Argyll and Bute Council, 2022/23, you will find more about these hallmarks of Argyll and Bute Council’s approach, and how
they are helping us to make the most of new opportunities and deal with existing and emerging challenges. 
Our track record in efficient financial management has, yet again, allowed us to continue to invest in the key areas of council business which mean
the most to our communities and help us to secure success now and in the future. At the same time, we have been able to minimise the impact on
jobs and services. The sterling efforts of our dedicated, agile, committed workforce are key in all of this and none of it would be possible without
them. 
No council can resist change – but here in Argyll and Bute we are working hard to make change work for our communities who depend on our core
services. We rely on our proven strengths – like good partnership working and financial prudence – and we strive for improvement, making space to
learn and ensuring we stay flexible and innovative in such a rapidly changing national environment. 
This latest Annual Report highlights many of the success stories we have been able to tell over the last year, about why Argyll and Bute is such a
great place to live, to work, to do business, to be. It sets the scene for our continued growth and improvement in years to come – and building on
what we’ve achieved this year increases our determination, our drive, our ambitions for Argyll and Bute’s future success. 
Councillor Robin Currie
Leader, Argyll and Bute Council

Page 7

7 
Chief Executive
It is with pleasure that we present the Argyll and Bute Council Annual Report for the financial year 2022/23. This report provides overview of your
council's activities, achievements, and challenges over the past year. As we navigate through the evolving landscape of local government and strive
to meet the needs of our diverse and vibrant communities, this document offers transparency into our actions and progress toward the collective
goals we have set for the region.
The past year has been marked by unprecedented challenges, from the cost of living crisis to economic uncertainties, and through-out this it has
been a time of resilience, adaptation, and innovation for Argyll and Bute. 
In this report we provide examples of our progress against objectives and outcomes and these efforts would not have been possible without the
dedication of our council members, employees, and the active engagement of our community members.
As we move forward into the next year, we acknowledge that our work is ongoing. Challenges persist, and new opportunities continue to emerge.
Yet, with the same determination and collaborative spirit that has defined our council, we remain steadfast in our dedication to building a stronger,
more inclusive, and sustainable future for all who call Argyll and Bute home.
We invite you to explore this annual report and gain insights into our journey over the past year. Your feedback and support are crucial to our
success, and we look forward to continued engagement as we work together to create a brighter tomorrow for Argyll and Bute. 
Pippa Milne
Chief Executive, Argyll and Bute Council 
Financial Statement
In 2022/23 the budget gap was £2.221m, prior to any measures to balance the budget, rising to over £37m over a five year period, with decisions
made to bridge the 2022/23 gap, reduce future year pressures and protect vital services. 
Furthermore, when agreeing the 2022/23 budget, the Council committed investment in key Council priorities including: 
• £2.653m to undertake improvements and repairs to the Roads network
• £1m to help safeguard and support future funding for Argyll and Bute’s Learning Estate Investment Programme
• £0.500m investment in Climate Change Projects
• £0.500m for active travel through further improvements of footpaths and supporting safer routes to schools.
• £0.300m to deliver a programme of street lighting
• £0.165m investment in third party organisations who support our Communities

Page 8

8 
• £0.100m invested in a litter bin replacement programme
• £0.100m to support Staycation investment 
Over the course of 2022/23 the Council allocated over £4.3m to Council Tax accounts to support people through the cost of living crisis, awarded
nearly £18m of non-domestic rates reliefs to support local businesses, paid almost £660k in Scottish Welfare Fund grants to support vulnerable
people and over £800k of Discretionary Housing payments were distributed to households in need. During the year the Council also continued to
pay grants to cover food and fuel for people in poverty and successfully referred them for support to advice agencies resulting in maximised benefit
income and reduced fuel costs of over £2.5m by the end of the 2022/23. 
Cross-cutting Strategic Activities 
Changing How We Work – Our Change Programme
‘Connect for Success’ is our change programme that’s all about us working easily and effectively together, and by doing so - making it easier for us
to deliver what’s needed of us. Years of multi-million pound budget cuts have made it more and more difficult for councils to deliver services and
support their communities. We are developing new ways of working together that make it easier to get things done. In brief, it means that we share
knowledge, effort and resources to do the best job possible for and with our communities.
There are 7 principles to the Connect for Success Programme
1. One Council One Place Approach - working with other public sector agencies and our communities to get the most from our resources.
2. Purpose and Mission Focus – we have limited resources, we need to carefully match our decisions to the council’s overall vision.
3. Employee empowerment - our employees have great skills and experience, we’re making it easier to work effectively.
4. Data and evidence driven decision making - we will use data and customer feedback to do more of what works well and change what doesn’t.
5. Learning Council - we are improving how we work by learning and using lessons from previous experience.
6. Agile – to we have decision-making and related processes that make it easy to put effective change into action.
7. Maximise opportunities that technology offer - we use technology to enable, support and progress our work.

Page 9

9 
The following are some examples of Connect For Success in action:
➢ One Council One Place Approach - we have set up a Community Engagement Group that is setting out expectations for working with our
communities in designing services.
➢ Data and evidence driven decision making - we have set up a Data Group to produce customer insight from data across the council that we
can use to develop services. 
➢ Maximise opportunities that technology offer – we are implementing one system to replace three HR systems. 
We are also embarking on a series of self-assessments to identify priorities for redesigning services. Pilots of the process are currently underway.
These will be reviewed prior to a decision on formal adoption or any adaptations to the pilot process. 
Working Together To Alleviate Child Poverty 
Alleviating Child Poverty is one of the council’s top priorities. We have been looking at innovative ways to combine data from multiple sources, both
from within and outside the council. This enables us to better direct financial advice and guidance to households and communities to help them
apply for and receive the benefits, grants and allowances available to families.  We are engaged with the Improvement Service and in particular their
Rural and Island Child Poverty Support Group. During the course of 2022/23 our work with the Improvement Service focused on the following three
work-streams:
➢ Engaged with a research body called SAVVI (Scalable Approach to Vulnerability Via Interoperability). Following this engagement we lobbied
national agencies such as the Department of Work and Pensions (DWP) and Social Security Scotland (SSS) to allow us to re-use their data,
which in turn enabled us to support vulnerable families. 
➢ Developed a data model that enables us to identify the communities where the uptake of some benefits is lower than other communities. 
➢ Seek funding from external sources to explore the option of ‘buying’ commercial datasets. This will enable us to enhance what we can tell
from data about the needs of our communities.
We began working with the Improvement Service to incorporate the council’s Revenues & Benefits data into this modelling, and also to explore the
data in much more detail, such as school catchment level. This makes coordinating support easier and more accurate, rather than looking at data at
a higher level where unmet need can be missed. 
Progress is ongoing for each of these work-streams, which will further improve our activities to encourage uptake of benefits, grants and allowances.
Alongside this we are monitoring the impact of this work over time as we aim to see uptake in these targeted areas improve. 
This activity is a clear example of our ‘Connect for Success’ Change Programme, in which Principle 4 seeks to focus on enabling data and evidence
driven decision making.

Page 10

10 
Rural Growth Deal
The Rural Growth Deal (RGD) will deliver £70m of investment across Argyll and Bute for projects that act as a driver for transformation and inclusive
economic growth.  Throughout 2022/23 we have been working to progress the outline business cases required for the signing of the Full Deal
Agreement.  To date 4 outline business cases have been submitted to Government with a further 7 nearing draft completion.  We plan to submit all
remaining business cases to Government in 2023 and we are working towards signing the Full Deal Agreement in this financial year.  Following the
deal signing we will enter year 1 of delivery. 
Specific outline business cases are mentioned at appropriate points throughout this report. 
The 4 outline business cases that have been submitted to government are:
➢ Kintyre Seasports 
➢ Marine industry training centre – UHI Argyll college are leading on this business case
➢ Clyde engineering and innovation centre 
➢ Oban UAV hub 
The 7 outline business cases that are nearing completion are:
➢ Rothesay pavilion
➢ Islay low carbon project
➢ Outline business case for housing on Islay
➢ Outline business case for housing on Mull
➢ Seaweed and shellfish innovation centre (SAMS)
➢ Machrihanish campus (linked with Stirling university)
➢ Rural skills accelerator programme (Outline business case contains 3 projects
The website also has a specific Question and Answer section which you can access from this link Rural Growth Deal - questions and answers |
Argyll and Bute Council (argyll-bute.gov.uk)
We also post regular project updates on the website which you can access from this link Rural Growth Deal | Argyll and Bute Council (argyll-
bute.gov.uk)

Page 11

11 
Climate Change
The Council has a statutory duty to report on its emissions and climate action via the annual Public Bodies Climate Change Duties (PBCCD) Report. 
Regular update reports are presented to the Council’s 6-weekly Climate Change Board which provides governance, oversight and discusses
progress and action.
The PBCCD Report for the year 2022/23 confirms that the Council’s total carbon emissions is 26,512 tonnes of carbon dioxide equivalent (tCO2e).
This represents a reduction of 1,705 tCO2e on total emissions for the previous year. Reductions are confirmed across Scopes 1, 2 and 3 emission
sources.
The following is an explanation of the Scopes 
➢ Scope 1 emission sources are direct emissions generated by an organisation itself. Examples include energy and fuel used in running
boilers, and burning fuel in non-EV fleet vehicles.
➢ Scope 2 emission sources are emissions that an organisation causes indirectly, and comes from where the energy it purchases and uses is
produced.
➢ Scope 3 emission sources includes emissions that are not produced by the organisation itself, but by those indirectly responsible up and
down its value chain. 
Projects delivered by the Council that have contributed to the reduction in emissions include:
➢ LED Streetlight Replacement programme 
➢ Solar PV and LED lighting installations at Council assets
➢ Installation of low carbon heating systems (e.g. air source heat pumps) 
Additionally, the Council’s Home Energy Efficiency Team provides grants to homeowners and private-rented tenants to improve home insulation.
This is via the Scottish Government’s Energy Efficient Scotland: Area Based Scheme.
The Council’s annual Public Bodies Climate Change Duties Reports for previous years are available to the public via the Sustainable Scotland
Network website https://sustainablescotlandnetwork.org/reports/argyll-and-bute-council

Page 12

12 
Best Value Improvement Action Plan 2020-2023
The Best Value Improvement Action Plan is now complete. Our Annual Audit Report from Audit Scotland in November 2022 concluded that the
Council has an appropriate and effective best value framework in place and continues to make good progress addressing the recommendations in
Best Value Assurance Report 2020. 
The Improvement Action Plan was broken down into 5 themes: 
Theme 1 - Develop the transformation agenda, supported by an affordable and achievable medium to longer term financial strategy.  
Theme 2 - Improve performance management reporting to provide a balanced picture of long term trends in performance against targets. 
Theme 3 - Increase the pace of transformational change to deliver the business outcomes. 
Theme 4 - Assess the extent to which regeneration and economic development initiatives are delivering the vision and corporate outcomes. 
Theme 5 - Work with communities and community groups to improve engagement. 
Delivery of the 5 themes was through 36 actions. Full detail of the actions can be found on the council website Best Value Improvement Action Plan
- Audit and Scrutiny Committee, 16/03/2023 
Audit Recommendations
An essential element of the work undertaken by Internal Audit is to monitor and assess whether recommendations relating to its findings, and that of
external audit, have been implemented by management of the Council. As part of the regular monitoring of progress, audit recommendations are
reported quarterly to the Strategic Management Team and actions to complete them are recorded and allocated to the responsible officers.
Supporting evidence is required from the responsible officer before being assessed by the auditor making the recommendation. 
Strategic Risk Register
The Strategic Risk Register (SRR) details significant challenges faced by the Council and the agreed approaches to manage them in the context of
risk mitigation. These challenges can be cross-cutting across all areas of the Council, although some are very specific to a service function and tend
to be long-term in nature. They each have specific interventions, subject to scrutiny at Strategic Committee Level and kept under formal review bi-
annually, although the SRR can be reviewed in the intervening period should matters need to be placed on the register by the Council’s Strategic
Management Team. A formal report is prepared on an annual basis by the Chief Executive on risk management and is reported to the Council’s
Audit and Scrutiny Committee. 
Currently the SRR has 14 risks in total. Four are red, seven are amber and the remaining three are green.

Page 13

13 
The four red risks relate to: 1) Population, External Infrastructure and Economic Decline, 2) Waste Management, 3) Cyber Security 4) Lack of
Housing Availability.
The seven amber risks relate to 1) Condition and suitability of Infrastructure & Asset Base, 2) Financial Sustainability, 3) Governance and
Leadership, 4) Engagement and Understanding the needs of the Community, 5) Health and Social Care Partnership, 6) Cost of Living Crisis and 7)
Impact of Climate Change.
The three green risks relate to 1) Service Delivery, 2) Civil Contingency and Business Continuity, 3) Welfare Reform.
Operational Risk Register
Separate from the Strategic Risk Register we monitor Operational Risks. These largely relate to a direct impact on service deliver. Our Operational
Risks are categorised into Red, Amber and Green. Key actions have been agreed to address all risks in the Operational Risk Register. 
All of our Red Operational Risks are summarised here with some mentioned in more detail in our Significant Challenges section of this report below. 
Executive Director Kirsty Flanagan has eleven red risks which relate to: 1) maintaining the road network for both condition and safety particularly
vulnerable coastal locations, 2) non-compliance for maintaining vehicles through legislation, 3) the lack of suitable candidates particularly for routine
road repairs and grass cutting on the islands where there is a lack of suitable accommodation, 4) the revaluation of buildings for non-domestic rates
by the assessor, 5) the impact of Covid on environmental health enforcement with limited budgets, 6) availability of suitable temporary
accommodation and housing support, 7) extreme localised weather causing loss of bridge, culvert, road or sea defence, 8) increased Winter
maintenance on our roads, 9) implications of the biodegradable municipal waste landfill ban, 10) aging bridges and retaining walls requiring
investment, and finally 11) the risk of cyber security breaches and attacks. 
Executive Director Douglas Hendry has six red risks which relate to: 1) unavailability of capital funding for the delivery of significant projects, 
2) increasing utility costs, 3) delivery failure of school kitchen supplies, 4) capital investment to keep buildings safe and operational, 5) capital
receipts targets not being met, and finally 6) not satisfying the compliance conditions of all external funding to the Council. 
Significant Challenges
As well as our Strategic and Operational Risk Registers, we face some day-to-day that can impact on service delivery. Here we summarise these
challenges. 
1. Staff Recruitment
Challenge - There is a national shortage of qualified professionals, specifically environmental health officers, building standards surveyors and
qualified planning professionals. We also experience difficulties in recruiting and retaining staff for posts in the catering, cleaning and some areas of

Page 14

14 
our Roads and Infrastructure Service. This places significant pressure on staff and reduces the capacity and resilience of teams. In turn the ability to
competently deliver services and our statutory duties is put under considerable strain.
Action - Various actions have been implemented to help mitigate these challenges. These include reprioritising workloads and redesigning how
services are delivered. Work is shared across a ‘virtual’ team rather than the traditional geographical teams. Staff structures have been reviewed
and realigned creating opportunities for upskilling and career pathways to build resilience. 
Importantly the combination of these actions should also support the moral and mental health of staff, as well as improve service delivery, customer
engagement and communication. 
2. Securing Contractors
Challenge - It is often difficult to secure contractors and consultants. There have been significant projects were only one tender was returned. This
resulted in the need to re-tender or delay the project. 
Action – Contractors are encouraged to apply to be admitted into the Council’s Dynamic Purchasing Scheme. This widens the pool of contractors
that are both willing and able to work in Argyll & Bute. Where possible we also use different delivery models with more emphasis on a mixed
economy solution. We also use a mix of in-house resources, Small Medium Enterprises and as well as national suppliers. 
3. Sickness Absence Due To Stress or Anxiety
Challenge - Sadly Stress and Anxiety consistently accounts for the highest proportion of days lost to sickness absence across the council. 
Action - We conducted a wellbeing survey, the results showed that 29% of employees who had been absent with stress or anxiety had not accessed
the structured Employees Assistance Programme that is available. We undertook a 3 month pilot with our partners who provide our Employees
Assistance Programme. Unfortunately this pilot was unsuccessful and was not rolled out further. We continue to remind staff of our Employee
Assistance Programme, and the ways they can access it so that they can make contact. Additionally, alternative ways to offer support are being
explored and outlined. 
4. Unplanned Demands
Challenge – We have experienced several unplanned demands. These demands increase the pressure on delivery of the statutory or committed
services, additional budgetary pressure and pressure on staff to deliver unplanned demands. The agility of our staff is the key to being able to deliver
these unplanned demands. 
Action - To help mitigate these additional pressures where possible we have revised our processes, systems and recruited additional staff.

Page 15

15 
5. Emergency Resilience and Planning
Challenge - We have a continuing duty to promote or enforce standards that preserve public health, public safety and protect the environment. The
remit is wide-ranging, from a suspected or confirmed outbreak of a communicable disease or an animal health incident such as avian influenza or
rabies. 
Action - To ensure we continue to protect the public, environment and promote public safety we are reviewing our emergency plans and
arrangements. This will ensure our level of preparedness for any emergency incident is suitable and robust. 
6. Electric Grid Limitations 
Challenge - Many areas within Argyll and Bute are off grid for gas, and the electrical grid has limitations in terms of capacity/constraints. These
issues continue to impact on the Council (and the wider community) in terms of resilience and being able to deliver renewable solutions, Electric
Vehicle charging, electrification of heat, etc. 
Action - We are lobbying the regulator to highlight the impact of these constraints. We also lobby the Electrical Network Operators, emphasising the
need for them to reinforce their infrastructure. 
7. Cost of Living Impacts
Challenge - The Cost of Living Crisis impacts on individuals, businesses and our ability to deliver services across all service areas. Price increases
and supply issues are continuing across all industry sectors. We have our ambitious 10 year Rural Growth Deal projects. The project budgets are
fixed for the 10 year programme period with limited capacity to build cost escalation contingency into the projects. Other significant pressures are the
cost of school catering and the impact on the building sector. 
Action - We continue to explore process improvements to identify efficiencies. We look at external funding to address any funding gaps and monitor
our contacts and supplies on an on-going basis, ensuring the supplies are appropriate. 
8. Managing Delivery of Large Scale Projects
Challenge - As well as financial resources for large projects, staff resources are required from various teams across the Council to deliver the
projects. 
Action - We are undergoing early engagement and where possible designing projects to limit ongoing staffing costs. Work has begun to identify the
staff resource requirements for the projects.

Page 16

16 
9. Improving How We Support All Our Pupils
Challenge - There has been a significant increase in school exclusions from previous years. This increase is primarily due to an increase in
dysregulated behaviour and is reflective of the national picture. 
Action - We have identified this as an area requiring further attention and will provide targeted support for specific schools where exclusion rates are
highest and continued universal guidance and support for all schools around alternatives to exclusion. There will be a sustained focus on Our
Children Their Nurturing Education (OCTNE), Season’s for Growth and Trauma Informed approaches all of which support staff to better understand
and respond to distressed and dysregulated pupils, with a focus on early intervention. 
10. Cyber Security
Challenge - The need for our ICT teams to be ever more vigilant and responsive has never been greater. 2022/23 saw another major rise in the
levels of risk associated with cyber-attacks. The war in Ukraine has been accompanied by increased levels of cyber-attacks emanating from Russia
and elsewhere. The public sector has repeatedly experienced significant cyber-attacks which disrupt services and has cost millions of pounds. This
has been a global phenomenon. 
Action - We have procured a new Security Operations Centre service. This will be implemented over the summer of 2023. This will provide a 24 hour
monitoring service for the Council’s network. We introduced new Cyber Awareness training from Mimecast and are actively promoting the training to
all networked staff. 
11. Improving Housing Solutions for Local People
Challenge - The housing system is increasingly complex and contains wide ranging effects on the society we live and work in. Across the UK, the
housing system is now in a position commonly recognised as being in a state of emergency. Within Argyll and Bute, these problems have had a
direct impact on property prices. There have been substantial increases in our area in recent years, private rental levels are rising at a substantial
rate, housing availability is decreasing despite our social rent build programme and local wages are not keeping up with inflation. 
Action - We have already identified improving housing solutions for local people as a priority. There is a need for the Local Housing Strategy (LHS) to
consider these recent issues in more detail and examine if they can be addressed by the Council, or our partners including the Scottish Government. The
LHS is updated annually, and it is proposed that this is the appropriate vehicle to do this. To support this, officers have set up an internal Housing Group
with relevant senior officers from across the Council’s Services participating.   
12. Changes to Managing Our Waste
Challenge - The Biodegradable Municipal Waste (BMW) ban is due for introduction in January 2026. This will affect the current waste collection and
disposal methods. Ferry capacity to service the requirements of the BMW ban and other emerging changes need to be planned and managed.

Page 17

17 
Other merging changes including Persistent Organic Pollutants (POPs), Circular Economy bill, carbon reduction initiatives, and market availability
particularly for Energy from Waste (EfW) feedstock. 
Action - Solutions identified through the Waste Strategy with ongoing discussions with Scottish Government and other appropriate bodies around
derogations and implications of the changes of various legislation and regulations will bring to the rural geography of Argyll and Bute. 
Complaints
In 2022/23 the number of stage 1 complaints fell to 467 from 499 in 21/22. Stage 2 complaints rose to 219 from 201 in 21/22.
Roads and Infrastructure Services continued to receive the majority of complaints in 2022/23 (stage 1 - 360) and (stage 2 - 122) 
Performance within timescale has fallen in 2022/23 to 79% for stage 1 against 82% in 21/22 and 59% for stage 2 against 70% in 21/22. The
Compliance and Regulatory team will continue to support services to try to improve this, through the provision of monthly reports which are sent to
Executive Directors/Heads of Service and Service Complaints representatives. 
All Council services follow the Scottish Public Services Ombudsman’s (SPSO) model complaint handling procedure (CHP). A requirement of this
model procedure is that the Council report to the SPSO on a standard set of statutory performance indicators, and prepare an annual report for
consideration by Members. You can view the Council’s Complaints Annual Report 2022/23 through this web link. Microsoft Word - Annual
Complaints Report 2022-23 V0.1 (argyll-bute.gov.uk) 
Absence
The number of working days lost to sickness in the UK hit a record high in 2022 according to data published by the Office of National Statistics.  The
number of working days lost because of sickness increased beyond pre pandemic levels.  The increase is a contrast from the low levels of absence
at the peak of the pandemic when many workers were furloughed, working from home and social distancing led to a drop in minor illness but it also
marks a reversal in the long term trend of declining sickness absence rates.
Absence data for 2022/23 saw increase for both Teachers and LGE. Teachers absence has increased by 0.60 of a day to 6.2 work days lost per
FTE.  LGE staff has increased by 0.90 work days lost per FTE to 14.3 days.

Page 18

18 
Working Days Lost per Full Time Employee - By staff category and financial quarter 
2020/21
FQ1
2020/21
FQ2
2020/21
FQ3
2020/21
FQ4
2021/22
FQ1
2021/22
FQ2
2021/22
FQ3
2021/22
FQ4
2022/23
FQ1
2022/23
FQ2
2022/23
FQ3
2022/23
FQ4
All Staff  2.75 3.21 4.46 3.97 4.48 4.05 5.09 5.19 5.36 4.88 5.35 6.52
Teacher  0.82 0.92 1.52 1.15 1.36 0.89 1.60 1.77 1.79 1.22 1.70 2.28
LGE Staff 
1.94 2.29 2.94 2.82 3.32 3.16 3.49 3.42 3.57 3.66 3.65 4.04 
Figure 1:  Teacher, LGE and All Staff absence trends across each quarter since 20/21

Page 19

19 
The top three reasons for absence in 2022/23 have been:
➢ Mental Health
➢ Infections
➢ Other musculoskeletal (e.g. broken/fractured bones, ligament damage, strains, pain) 
This is a different list from the year previous where Stomach/Liver/Kidney/Digestion issues and Medical Treatment featured in the top 3 as well as
Mental Health. Covid absences began to be recorded under normal sickness absence with effect from 1 July 2022 this along with no Covid
restrictions is likely to have accounted for infections moving into the top 3 reasons for absence.
The following is an analysis of the reasons for absence across the service conditions of APTC, Manual and Teachers for all work days lost:
➢ For APTC it was Mental Health absences accounting for 32% of work days lost
➢ For Manual Workers it was Mental Health absences accounting for 19% of work days lost
➢ For Teachers it was Infections accounting for 28% of work days lost. 
We have launched pilots for a number of activities in the area of Wellbeing including: 
➢ first day assistance for those that report absence due to mental health reasons
➢ online physiotherapy including webinars for desk based employees and body mapping workshops for manual staff
➢ a 12 week programme focusing on building sustainable healthy habits to support health
➢ wellbeing webinars on a range of topics 
Those activities that have focused on supporting employees in the workforce have been much more successful that those that focused support on
employees who had already reported absent.  Those that have been successful will be continued this year.  Argyll and Bute Council’s Wellbeing
Toolkit will be launched on 13 September 2023 available on our MyCouncilWorks giving employees and managers’ access to lots of health related
information, sources of support and access to relevant policies and procedures to support continued good health.
Going forward additional wellbeing focus will be on:
➢ developing focused and targeted corporate communications on wellbeing
➢ continued support for managers with ongoing absence cases and team based intervention tools
➢ improving mental wellbeing

Page 20

20 
Quality Conversations
Our approach to PRDs has changed. Our updated approach is based on measuring and improving outcomes from the conversations that managers
and employees have about performance, behaviours and career / development aspirations. Our approach is called Quality Conversations.
Quality conversations are at the heart of how we do our business. Having the skills and confidence to engage in quality conversations with our
colleagues, partners and communities is one of our key priorities. 
During 2022/23 we launched the roll out our new approach, following which we conducted the first survey.
Analysis told us that 53% of responders had received a Quality Conversation.
The key findings are:
➢ People are clear about what’s expected from them in their role.
➢ They know what skills and behaviours are required to achieve their objectives.
➢ They have the knowledge and skills to achieve their objectives.
➢ They know where to access help to meet their objectives.
These results will become our base survey and will be repeated and reported on annually.
Our Performance 
Our Corporate Outcomes
Our Corporate Plan sets out our mission to deliver on the vision shared with our Community Planning Partners - Making Argyll and Bute a place
people choose to Live, Learn, Work and do Business. For the Council this is delivered through the 6 Corporate Outcomes:
➢ People live active, healthier and independent lives
➢ People will live in safer and stronger communities
➢ Children and young people have the best possible start
➢ Education, skills and training maximise opportunities for all
➢ Our economy is diverse and thriving
➢ We have an infrastructure that supports sustainable growth
To enable us to deliver on our 6 Corporate Outcomes we have one supporting outcome ‘Getting it right’. Activities within this outcome underpin our
cross-cutting ways of working, efficiencies and behind-the-scenes service delivery.

Page 21

21 
Each Corporate Outcome is delivered through the Corporate Outcome Indicators. 
Performance Management Improvements
A project to review our performance management and reporting procedures has been undertaken with the first phase nearing completion. During
2022/23 several outputs of the Performance Management Project were implemented. One aim of the project is to support scrutiny of performance by
Elected Members and Senior Officers. As a result the following changes were made – we removed Business Outcomes and identified a suite of 47
high-level indicators that directly align to the Corporate Outcomes. 
These 47 indicators are known as the Corporate Outcome Indicators (COIs). Aligning the COIs to our Corporate Outcomes helps illustrate how we
are delivering on our Outcomes. The indicators are strategic and long-term in nature. They are reported annually after FQ4 to the Audit and Scrutiny
Committee and Full Council, and thereby presented within this report. 
We continue to report other indicators of importance on a quarterly basis at each of our Area Committees. The Quarterly Area Performance Reports
present a suite of indicators at a local, area level with complementary narrative, and where possible Council-wide performance is also presented
alongside these indicators. All previous Area Performance Reports can be viewed on the Council Website here. All previous Quarterly Area
Performance Reports can be viewed on the Council Website here (argyll-bute.gov.uk). 
Delivering On Our Outcomes - Corporate Outcome Indicators 
2022/23 is the first year that the 47 Corporate Outcome Indicators have been used. Due to the nature of the change it is not possible to draw a direct
comparison to previous years’ performance however, where possible historic data is used to help identify the overall trend and progress on
delivering our Corporate Outcomes. 
Where appropriate a Target is used to track Performance and progress is identified using a Red or Green status indicator to track performance. Not
all indicators have a Target, where this is the case the trend data is helpful for scrutiny. 
For the majority of indicators the data is collected and presented annually, or even quarterly if this is possible and appropriate. However, in some
cases the nature of the indicator means the collection of data results in a longer lag-time, or the data is collected biennially. 
The following table illustrates how we have delivered on each of our Corporate Outcomes. This is followed by the detailed performance and
supporting commentary for our Corporate Outcome Indicators.

Page 22

22 
Overall Performance Of All Our Corporate Outcome Indicators
Corporate Outcome Number Of
Indicators
Number On Track / Above
Target / No Target With
Improving Performance
Number Off Track /
Under Target / No
Data 
People live active, healthier and independent lives 6 4 2
People will live in safer and stronger communities 4 3 1
Children and young people have the best possible start 8 7 1
Education, skills and training maximise opportunities for all 7 6 1
Our economy is diverse and thriving 12 10 2
We have an infrastructure that supports sustainable growth 5 5 0
Getting It Right 5 4 1
TOTALS  47 39 8 
How We Compare Nationally – Local Government Benchmarking Framework (LGBF) 
We view benchmarking as a crucial tool to help us improve as well as using a variety of improvement tools. We attend and contribute to all the
national groups and networks as well as the Local Government Benchmarking Framework (LGBF) which all local authorities participate in.
All local authorities participate in the Local Government Benchmarking Framework (LGBF).The aim of the Framework is to present a range of
indicators that can be used to compare performance across all Scottish local authorities. There are many differences to take into account when
comparing our performance with other councils. To help make these comparisons more meaningful and share good practice we are part of a 'family
group' of eight other councils, with similar characteristics such as the type of area and levels of deprivation. More detail on the LGBF and ‘family
groups’ can be found by clicking on the above link, you will be taken straight to the LGBF where you can compare our performance. 
The 2022/23 data is due for release in December 2023. The latest full-year data that is available is for 2021/22. 
As well as participating in the LGBF we actively engage with other sector specific organisations. This allows us to share best practice and
benchmark our performance, both activities are valuable tools to help us identify improvements.

Page 23

23 
Delivering Our Outcomes - Key Successes by Corporate Outcome
Corporate Outcome: People live active, healthier and independent lives 
Number of Indicators: 6 
Number on Track: 4 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Maximise distribution of
Scottish Welfare Fund 95.30% 96.70% 85.90% 120.70% 144.00% G
The 2022/23 overspend has been covered by earmarked
reserve from 2021/2022. This has ensured that the Council
has been able to continue its support to its most vulnerable
citizens in the year through the provision of Crisis Grant and
Community Care Grant funds. 
Percentage of clients
satisfied that they are
better able to deal with
their financial problems
90.00% 100.00% 100.00% 100.00% 100.00% G
This voluntary survey is distributed with no obligation for a
client to complete or respond. All clients who expressed an
opinion agreed that they are better able to deal with their
financial problems following our support.
It is important to note that no negative comments or
responses were received.
Maximise distribution of
Discretionary Housing
Payment (DHP) fund
96.00% 101.60% 99.90% 98.20% 79.00% R
Actual expenditure at yearend was £807,000 meaning a
funding underspend by £172,000 in 2022/23.  Looking at the
detail we received less claims for bedroom tax Discretionary
Housing Payment and benefit cap Discretionary Housing
Payments than the Scottish Government had forecast. 
Percentage of care
services graded 'good'
(4) or better in Care
Inspectorate Inspections
(HWBOI NI17)
75.20% 85.00% 87.10% 80.00% 79.50% G
This indicator measures Adult Services rating only. The
HSCP report for this measure is updated in line with Health
And Care Experience Biannual schedule, however Care
Inspectorate gradings are updated more frequently.
Percentage of adults
receiving any care or
support who rated it as
excellent or good
75.30% 79.90% 78.30% 78.30% 68.60% R
Biennial Data Periods 2017/19; 2019/21; 2021/23 
There is no update to the data until Feb 2024 at the earliest.
It is worth noting that performance against this target will be
influenced and vary in line with the Biennial total number of

Page 24

24 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
respondents participating in this voluntary survey. As such
caution should be noted with regards to previous comparison
and trends.
Percentage carers who
feel supported to
continue in their caring
role
29.70% 35.00% 35.00% 38.00% 38.00% G
Biennial Data Periods 2017/18; 2019/20; 2021/22 
There is no update to the data until Feb 2024 at the earliest.
It is worth noting that performance against this target will be
influenced and vary in line with the Biennial total number of
respondents participating in this voluntary survey. As such
caution should be noted with regards to previous comparison
and trends. 
Supporting people to deal with their financial problems
Helping residents maximise their income through claiming additional benefits or paying grants to vulnerable people assists with independent living,
preventing homelessness and helps reduce the number of households and families living in all various types of poverty including extreme poverty. 
The following are some headline figures illustrating how we have distributed the payments and our performance - 
➢ A total of £659,812 in Scottish Welfare Fund grants were paid to support vulnerable people.
➢ A total of £804,839 of Discretionary Housing Payments was distributed to household in need.
➢ We paid out £133,625 in grants to cover food and fuel for people in poverty and successfully referred them for support to advice agencies. 
➢ During the year a total of 1,810 families have been supported to maximise benefit income and reduced fuel costs to the value of £2.527m.
➢ We allocated £4.3 million to Council tax accounts to support people with the cost of living crisis. 
➢ The average processing time for New Housing Benefit claims was 25.63 days and 5.60 days for changes in circumstances against targets of
21 days and 6 days respectively.
➢ We are delivering the Energy Bill Support Scheme and the Alternative Payment Fund on behalf of the UK government. The scheme started
in February 2023 and runs until the end of May 2023. 
➢ The results of our Welfare Rights customer satisfaction surveys show that 99% of respondents would recommend the service.
➢ In line with Scottish Government Policy the basic pay of carers and personal assistants who look after adults in our communities were
implemented twice during the year.

Page 25

25 
➢ We calculated and implemented contract rates for the Council’s early learning and childcare partners that enabled them to sustain their
services and pay their staff at least the Scottish Living Wage. 
Helping People Into Work
Argyll and Bute Council’s Employability Team and Third Sector delivery partners assist people into work. There are a number of programmes
available to our residents, which offer a tailored support package to suit individual needs and help participants progress towards education, training
or employment. 
There is a broad criteria for participants:
➢ Individuals between the ages of 16 and 67 years who are facing barriers in moving towards and into employment.
➢ Young people within 6 months of the school leaving date who require support to move towards and into work.
➢ Low income parents (including kinship carers) who require support to move towards, into or to increase their income in-work. 
➢ Employers looking to host a fully funded work placement or recruit someone utilising an employer recruitment incentive.
Using a holistic approach participants have access to accredited training, work placements paying the Real Living Wage, benefits, debt and fuel
poverty advice, assistance with job applications, CV creation, interviews skills and techniques. Specific items can also be purchased to remove
specific barriers, for example, a digital device to access online learning or a bicycle to help address poor transport links and allow travel to and from
work.
The following are some quotes from participants, explaining their views on the support offered and the outcome achieved.
➢ “I’m extremely grateful for the support provided by ABERTI, this gave my employer the incentive to appoint me as an adult apprentice
particularly given the additional costs associated due to my age” 
➢ “My family and I have received a lot of support since coming to Scotland. I received a bike and a laptop which has helped me work more
hours and I am able to study in my free time. I hope to start up my own business in the future. The continued support I receive from my PESF
worker is very much appreciated”
To find out more information please visit Helping people into work | Argyll and Bute Council (argyll-bute.gov.uk)

Page 26

26 
Corporate Outcome: People will live in safer and stronger communities 
Number of Indicators: 4 
Number on Track: 4   
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
The percentage of
groups who say their
effectiveness has
increased as a result of
capacity building by the
community development
team
75.00% 100.00% 100.00% 100.00% 90.00% G
The results are from an annual survey of customers and
community groups engaged with the Community Planning
and Community Development Team
The information provided
to our community
groups, individuals and
partners is easy to
understand
75.00% 93.00% 89.00% 96.00% 90.00% G
The results are from an annual survey of customers and
community groups engaged with the Community Planning
and Community Development Team
The total value of
compensation
settlements for vehicle
damage / driver injury as
a result of road / bridge
faults
No Target £4,307 £2,884 £2,807 £1,879 No
Target
The sums paid out have decreased year on year which may
be indicative of an improvement in road and bridge surfaces.
Percentage of adults
residents stating their
neighbourhood as a 'very
good' place to live (CSS
– survey owner)            
Awaiting Survey Launch

Page 27

27 
Keeping People Safe
The number of service requests received has increased by 60% post Covid pandemic, at a time when resources are limited. An exercise was
undertake to review the services response to specific service categories, and determine the most appropriate response. Given resourcing and our
legislative powers, and to identify some additional resource. These findings have been implemented.
Avian Influenza. The UK experienced its largest avian influenza outbreak in 2022 and the outbreak has continued into 2023 with outbreaks and
positive cases still being identified. Specific actions have been taken by Argyll and Bute Council to engage with commercial and domestic poultry
keepers to enhance their biosecurity arrangements and other controls, to provide advice to minimise contact with wild bird carcases which were
washed upon our coastlines, and review the Councils arrangements to respond to an avian influenza outbreak in our area.
Successful prosecution cases were prepared by the Councils Regulatory Services relating to a fatality in Loch Awe against a boat hire company,
who hired a boat from a local business (Health and Safety at Work etc. Act 1974) and for an offence against a farmer for unnecessary suffering of an
animal (Animal Health (Scotland) Act) 
The Councils internal audit team assessed the arrangements in place within the Environmental Health Service to carry out the Council’s
enforcement responsibilities under the Health and Safety at Work Act 1974.The audit opinion was “substantial”, whereby internal controls,
governance and the management of risk is sound. Three minor issues were identified and an action plan is in place to address these by the 30th
June 2022.
To ensure our residents live active and healthier lives requires us to monitor elements that can impact on overall health, work closely with our
Partners and when necessary take enforcement action. There has been in increase in Nitrogen Oxide levels as transportation has increased towards
pre-Covid levels. An air monitoring program that assesses the local air quality was completed. It concluded that local air quality in Argyll and Bute is
good and well below prescribed standards but well within national targets. 
A safer place to live, work and visit
Within the Community Safety Partnership Strategy we worked with key partners including Police Scotland, Scottish Fire and Rescue Service, HM
Coastguard, Health & Social Care Partnership (HSCP), Third Sector Interface (TSI) and local groups to bring together resources to ensure that
Argyll and Bute is a safer place to live, work and visit. 
Two examples of this is information received from Police Scotland for the group to consider appropriate safeguarding measures to support
individuals reduce their vulnerability to being drawn into terrorism and the Mentors in Violence Prevention (MVP) programme. MVP is a peer
mentoring programme that gives young people the chance to explore and challenge the attitudes, beliefs and cultural norms that underpin all forms
of gender-based violence in our society. We have a robust 3 year MVP development plan in place. This has helped to ensure strategic direction and
a focussed approach to implementation of the programme.

Page 28

28 
The programme has faced challenges within schools in terms of having the capacity to release staff for training.  We will continue to work to develop
the number of trainers, which will help provide schools with their own internal succession plan systems.  We will also look to increase the number of
partners trained so that other services can support the programme, reducing demand on teaching staff.
Supporting Our Community Councils
Online and in person training has been delivered to over 50 community councillors. Community Councils from across the area were introduced to the
National Standards for Community Engagement and a variety of online and offline tools. 
The training lead to open and rich conversations around current practices and difficulties when engaging underrepresented groups. Conversations
covered issues such as the barriers people may face when engaging with local democracy, and the range of traditional and digital methods that
could be used to gather a diverse and representative views. 
As with most training, there were secondary benefits to both the participants and trainers, the sessions also strengthened connections and best
shared practice between Community Councils and across the authority. 
The course evaluated well and subsequently a 15 minute summary of the training was created as a YouTube video and the link was circulated to
community councillors unable to make the training, you can access the training video from this link Community Engagement for Community Councils
in Argyll and Bute - YouTube 
Other training delivered during this year by the team included: 
➢ Risk Management for Community groups 
➢ How to write an environmental policy and an action plan for your organisation 
Community Organisations Received Capacity Building Support
The Lochside Champions are a group that represent people with autism who attend the Lochside Resource Centre in Lochgilphead. The group were
supported and attended the Mid-Argyll, Kintyre and the Islands Area Community Planning Group meeting. On behalf of the group they represent
they raised a number of issues at that meeting including: 
➢ That the homes are lovely but often situated too far out of town causing feelings of isolation at times. 
➢ More work opportunities would be welcome. 
➢ The lack of transport choices in the area is constraining, this made it very hard to do things on a whim or last minute for example.

Page 29

29 
At the meeting the group was introduced to a key partner, the Third Sector Interface, who subsequently visited and talked to them about supported
volunteering opportunities. Another partner, Fyne Homes, has subsequently visited the group to talk about housing and donated materials for their
garden area. The group were put in touch with the strategic transport team within the Council. Work is ongoing with the group to strengthen their
governance and ensure they can fundraise and lobby effectively. 
Building Standards achieves maximum 6-year licence
Building Standards exceeded all targets for the 5 key national performance targets for 2022/23, attained one of the best customer satisfaction rates
from the national Building Standards customer satisfaction survey run by the Scottish Government and achieved the maximum six year verification
licence from the Scottish Government, which allows us to vett and verify building warrants.  This brings benefits to the built environment and
supporting our economy. During the period 2022/23 our work in supporting the economy resulted in a total 1,377 building warrants processed.
During the year there was an increase in the number of dangerous buildings complaints with occasions for emergency action to ensure that public
safety was secured. 
Short-term Lets
The Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022 required the design and development of a new Short-term Let
Licensing scheme and policy. This is to ensure short-term lets are safe, address issues faced by neighbours, enable local authorities to know and
understand what is happening in their area, and to handle complaints effectively. It also aims to balance the economic and tourism benefits from
short-term lets with the needs and concerns of local communities across Argyll and Bute.
New operational arrangements to deliver the short-term let licensing regime were developed. This included the development of procedures,
communication and engagement with the sector, an on-line information management system coupled with an online application process. 
Welcoming Ukrainian Refugees
Ukrainian refugees have been welcomed to Argyll and Bute through the Scottish and UK Government’s sponsorship in response to the invasion of
Ukraine by Russia and the evacuation of the civilian population.  
The council’s resettlement team was scaled up and the multi-agency partnership established to coordinate support.  Over 300 Ukrainians have
chosen to resettle in Argyll and Bute and the Ukrainian population is dispersed across the whole authority.  Ukrainian pupils are supported in school,
with over 100 pupils attending 23 establishments.  Ukrainian adults are supported to learn English and to move into work.  A wide variety of activities
and events have been arranged with services across the council providing support including Housing, Regulatory Services, Business Gateway,
Employability, Welfare Rights, Revenue and Benefits, Community Development, Social Work, Public Health and Education.

Page 30

30 
Covid Recovery Strategy
To support the process of returning to normality in response to the Covid pandemic a Recovery Strategy was developed. This led to the publication
of the Argyll and Bute Recovery document; Restart, Recover and Renew. The document focuses on a range of areas, including economic and social
recovery, building back stronger communities, public health and infrastructure. 
It also recognises the importance of economic factors in driving our recovery. A thriving local economy will underpin renewal, providing opportunities
for local people although population decline will continue to be a major factor in our capacity for recovery and renewal. 
Corporate Outcome: Children and young people have the best possible start  
Number of Indicators: 8 
Number on Track: 7 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Provide quality meals
within cost margins to all
pupils
+/-5% -0.0345 -0.069 -0.04 -2.56% G
Catering continues to perform well, with the variance from
food costs within the +/-5% target across the area. We
continue to monitor areas/locations that fall outside of the
target variance
Increase the percentage
of our care experienced
young people that have
the recommended
additional tracking and
monitoring plans in place
100.00%   100.00% 100.00% 100.00% G
Virtual Head Teacher is now in post and continues to work
on updated approaches to the monitoring, tracking and
progress of this cohort. Targets for Attainment, Exclusion
and Attendance updated and agreed with the Corporate
Parenting Board.
Percentage of children
living in poverty (After
Housing Costs)
No Target 23.30% 18.90% 21.70%   No
Target
Latest Data is 2021/22. Data is taken from the Local
Government Benchmarking Framework (LGBF). Since
2018/19 the percentage of children living in poverty has
improved against all local authorities. Latest data indicates a
relative position of 11 out of all authorities (with lowest being
best). Although we are advised to view the annual figures in
the longer term, it does appear that Argyll and Bute’s broad

Page 31

31 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
array of tackling child poverty actions are having a positive
impact and it is important that they are maintained and built
upon.  
Our percentage rate for
attendance across all
Argyll and Bute schools
is comparable or better
than the Scottish
national average
(Biennial data)
92.00% 93.50% 93.30% 93.30% 90.55% R
This figure is taken from provisional Attendance, Absence
and Exclusions (AAE) census data and is embargoed. We
have used some basic reports from the AAE census but
have no way of checking that this is correct at this time. We
are waiting for data to be released for Director sign off and
that will be actual data. Biennial 2020/21 Data 
Support the increase in
the uptake of available
Grants, Allowance and
Entitlements
2,573 3,103 2,998 2,853 2,999 G
Education have worked with schools in relation to the take up
of EMA application and have issued individual
communications to eligible pupils.  Public notices and social
media posts have been issued to publicise other available
grants including free school meals and clothing grants
A counselling service is
available in all secondary
schools
100.00%   100.00% 100.00% 100.00% G
The new School Counselling Service delivered by The
Exchange (TCS) was launched in January 2023 and
provides 100% coverage of  services across all schools and
localities where required.  The new service offers a broader
range of delivery options than the previous service and is
currently managing demand very effectively.
The percentage of
children with no
concerns across all
domains at 27 to 30
month assessment 
82.10%  87.10% 85.50% 87.30%  No Data  G
This indicator is taken from the Local Government
Benchmarking Framework (LGBF), the latest data is for
2021/22. The Scotland wide performance for FY 2021/22 is
82.10%. Comparatively we are second highest in our Family
Group of 8 Local Authorities and one of two authorities
where performance has improved. Our performance against
the previous year has improved by 1.8% on the previous
year.
Within the HSCP Integrated Performance Management
Framework, the Child Health Measure being monitored on a
quarterly basis across Argyll and Bute HSCP is as follows:

Page 32

32 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Reduce the % of 27 - 30 month reviews conducted out with
the agreed time period, with a target of 90%.
95% of schools have a
suitability rating of A or B  95.00% 95.00% 95.00% 95.00% 95.00% G
All schools within Argyll and Bute currently have a condition
rating of A or B.  There are 2 schools which have a suitability
rating of C (North Bute and Tobermory). Education are
currently awaiting the outcome of a LEIP application to
support the building of a replacement school for Tobermory. 
Providing Support for All Our Learners
To ensure appropriate support is in place for all our learners, including those with the most complex needs, we have been working closely with the
CALM training organisation. This enables us to access training that helps staff understand more complex dysregulated behaviours and how to
reduce and prevent those behaviours over time. 
The training focusses on prevention and a reduction of restrictive responses. A section of the course examines best practice and trauma informed
positive behaviour support. Staff who have completed this have provided feedback regarding the positive impact that learning from the training is
already having on their practice. 
Alongside this focus on the specialised training we have updated our documentation and guidance for staff. In addition to this we have delivered staff
awareness raising sessions on the changes to this important guidance. 
Nurturing and Supporting our Young People
School staff are well equipped to adopt nurturing and trauma informed approaches to our most distressed young people. Our nurture teachers have
provided intensive, time-limited support through coaching and capacity building. This ensures that the young people who need this most are
supported. Qualitative feedback from staff in schools indicates the positive impact this work has on children, young people and staff wellbeing. 
In order to improve outcomes for children and young people a new Counselling in Schools Service was implemented. The new service is delivered
by ‘The Exchange’ (a school counselling service). Monitoring of the data and evidence gathered is showing very positive impact for children and
young people where they feel listened to and supported. 
Other notable activities are:

Page 33

33 
➢ Additional tracking and monitoring of attendance and attainment has led to targeted support and interventions for Care Experienced Children and
young people. As a result, close analysis of the data has shown positive outcomes from the targeted support including an increase in positive
destinations to 94%, which is above our target of 85%. 
➢ A sustained low number of exclusions for care experienced children and young people continues to remain below 5. Interventions to support this
sustained low number of exclusions includes individual work with children by Health and Wellbeing Liaison Officers, School based personalised
support, Education Psychology support, health discussions and wider partnership working. 
➢ Additional resources to support the nurturing environments provided in each Early Years setting including partner providers, which in turn
enables more flexibility in how they use their environment to support self-regulation for children. 
➢ Training sessions supported 143 practitioners engaging in dialogue around infant behaviour and how to apply nurture principles to their
understanding of this. An increased number of settings reported feeling empowered by their growing knowledge around nurture to better
understand and thus support dysregulated behaviour in children. 
➢ Bespoke training to support practitioners to increase their skill and confidence in delivering play and learning outdoors was delivered. This
resulted in a better understanding of how specific outdoor environments can deliver learning for children, engages and extends children’s
thinking and supports their connection to the natural environment. The participants all reported that they felt more confident to assess risk,
engage new skills and deliver learning outdoors. 
➢ The United Nations Convention on the Rights of the Child (UNCRC) is seeing increasing demands placed on schools in relation to youth voice.
There are ongoing challenges in bringing all council departments up to speed in relation to UNCRC, and we have been working to develop a
cross-council Youth Voice structure.  The UNCRC working group is meeting regularly to address this and using framework and guidance to
inform approach.  Continued engagement in the Rights Respecting Schools (RRS) programme is helping to raise community awareness of
RRS. 
My Tribe Period Product Provision
Argyll and Bute’s My Tribe brand has been identified as an exemplar of good practice across Scotland. The success has been recognised by the
Northern Alliance who have asked the Project Lead to support the roll out to other Local Authority areas.  As well as the provision of free period
products, support has been provided in schools and Period Product Champions have been trained. There has also been engagement with
community organisations and promotion of My Tribe via Social Media channels.

Page 34

34 
Award winning School Meals Service
We delivered over 1.2m School Meals and Early Years’ meals as well as winning the following awards -
➢ Health and Nutrition Award 2023 for our school meals drone delivery pilot
➢ Health and Nutrition Special Contribution Award 2023
➢ Cateys 2023 Public Sector Caterer Award
➢ ASSIST FM Community Focus Award 2023
Working closely with Education online payment and cashless catering was successfully rolled out to all our primary and secondary schools. This
allows online pre-ordering which enhances the service for our children and young people. It also gives parents and carers the ability to assist pupils
in ordering meals and view live fund balances for paying pupils. Importantly the system also assures the anonymity for our Free School Meal pupils.
The Catering Team won a Health and Nutrition Award for piloting the delivery of school meals via drone. The pilot was successful and will allow us to
investigate the provision of meals to our remote areas, reduce the climate impact of the service and maximise the use of technology. This pilot has
also been shortlisted for a COSLA Excellence Award 2023, with the awards ceremony taking place in September 2023.
The Council continues to offer fresh, healthy and sustainable school lunches, and holds the Soil Association Scotland’s ‘Bronze Food For Life
Served Here’ award. The award helps local authorities to source food from the local area for school meals so that children benefit from freshly
prepared, sustainable meals. The award is a widely respected and independently assessed. It is supported by the Scottish Government and
recognises Councils that serve food made from fresh ingredients, free from genetically modified ingredients and undesirable additives, using free-
range eggs and high-welfare meat. 
Taking into account feedback received from catering staff, education staff, parents and pupils, a new menu and a third meal option was implemented
for all Early Years, Primary and Secondary school pupils. The menu is compliant with the ‘Food for Life’ served here Bronze award and was
analysed in accordance with the Scottish Governments Food and Drink in Schools (Scotland) regulations 2020. The new menu is lower in sugar,
salt, red meat, processed red meat products and ensures all pupils have access to more fruits and vegetables. 
Corporate Outcome: Education, skills and training will maximise opportunities for all 
Number of Indicators: 7 
Number on Track: 6

Page 35

35 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Maintain the percentage
of all young people
leaving school achieving
a positive destination
into further education,
training or employment *
ACADEMIC YEAR
95.00%   94.00% 93.50% 95.20% G
The Annual Participation Measure (APM) for 2022/23 was
published at the end of August 2023 and reflects as
significant increase on last year's APM of 1.7%. This figure
exemplifies that the Stretch Aim set by the Education Service
of 95% has been overtaken.
Maintain the percentage
of successful
examination
presentations in levels 4
and 5 for Literacy and
Numeracy by our senior
phase pupils *
ACADEMIC YEAR
60.00%   100.00% 97.00%
SCQF 4
87.23%
SCQF 5
66.84% 
G
The data indicates that the levels of passes in Literacy and
Numeracy is being maintained year on year, with only a 1%
difference between 2022 and 2023 in both SCQF 4 and
SCQF 5 Literacy and Numeracy, measured as detailed
above.
Increase the uptake of
wider achievement
opportunities which
complement traditional
SQA awards and offer
alternative ways to
develop learning, life and
work skills
No Target    88.00% No
Target
Enhanced Wider Achievements Programmes across all
Secondary Schools continue to be under development and
are partially supported by UKSPF funding successfully
obtained by the Education Service. 
The percentage of
Modern Apprentices that
go on to a positive
destination after
completing the Argyll
and Bute Council
Modern Apprentice
Programme
95.00% 97.40% 100.00% 96.10% 96.20% G
The progress of Modern Apprentices onward to positive
destinations remains high.  We will be investigating
expanding the reach of the Modern Apprentice programme
through forthcoming workforce planning discussions.

Page 36

36 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
The percentage of
children that achieve
their appropriate
developmental
milestones by Primary 1
70.00%
Not
Collected
(Covid)
75.00% 64.00% 63.00% R
Moving forward, our Strategic Plan, Early Years 2023-24,
highlights collaboration with Education Scotland’s Curriculum
Innovation Team. This will facilitate ‘live’ service design
project across Early level, which will start from the adult
learners as they ask ‘why?’; scaffolding them to take a closer
look at the role of the educator within the cycle of learning,
teaching and assessment.’
The percentage pass
rate for the National 5
qualification is
comparable or better
than the Scottish
national average *
ACADEMIC YEAR
No Target 91.60% 87.50% 79.70% 77.39% No
Target
For session 2022-2023, the post-appeal National 5 pass rate
in Argyll and Bute at grades A-C is 77.39%.  The national
post-appeal data will not be made available until December
2023. 
Argyll and Bute’s pre-appeal pass rate for National 5 was
76.93%. The national pre-appeal A-C pass rate for National
5 is 78.80%. 
The percentage pass
rate for the National
Higher qualification is
comparable or better
than the Scottish
national average *
ACADEMIC YEAR
No Target 90.50% 90.20% 80.90% 77.35% No
Target
For session 2022-2023, the post-appeal Higher pass rate at
grades A-C is 77.35%.  The national post-appeal data will
not be made available until December. 
Argyll and Bute’s pre-appeal pass rate for Higher was
77.12%. The national pre-appeal A-C pass rate for Higher is
77.10%. 
Increasing Attainment at the 1st Level
Following analysis of literacy attainment data with a specific focus on children residing in quintile 1, eight schools were invited to participate and have
undertaken training in using a Quality Improvement approach to support writing attainment at 1st level. Training was originally offered by the Children
and Young People Improvement Collaborative (CYPIC) Improving Writing Programme and is now being delivered within the authority, supported by
allied health professionals and our Attainment Advisor. Data shows that attainment at 1st level within the first set of schools to undertake the training

Page 37

37 
has increased from an average of 56.2% in 2022 to an average of 72.8% based on Feb 23 predictions. Delivery of the programme to schools in
cohort 2 has now commenced, with cohort 3 due to commence in September 2023.  
Digital Support for Schools and Learners
Digital learning is supported through the deployment of additional devices which have been provided from the digital poverty initiative. This initiative
is funded by the Scottish Government. Our most remote schools now benefit from upgrades of bandwidth and all our Primary and Secondary
schools now have Skype for Business.
We undertook a successful pilot which uses technology to help reduce and remove literacy barriers for children with additional support needs. The
pilot increased engagement in education outcomes, improved wellbeing and raised attainment levels in literacy. Children involved in the pilot are
now using a range of assistive technology more confidently and independently. The technology we piloted is Enhancing Literacy Skills for those with
Additional Support Needs using Technology (ELSAT).
Supporting Learners to Realise Their Potential
We have broadened and improved the vocational educational provision in schools, and developed strong partnerships with employers and agencies
who can contribute to the development of young people’s skills and prospects. Our Developing Young Workforce Co-ordinators have instigated and
developed partnership agreements between schools and employers, resulting in an increased number and range of work placement opportunities for
young people. In the Senior Phase (S4-S6) we have continued to develop approaches to ensure personalisation and learning choices for all pupils.
Working in partnership with Argyll College we are supporting the development of an increased choice of pathways for S4-S6 pupils which allows
them to attain their chosen positive destinations in the adult world. Twenty networked college courses now feature in Senior Phase course choices
and are available virtually to all S4-S6 pupils. Work is ongoing to extend the Senior Phase curriculum offer to include further Foundation
Apprenticeships and HNCs delivered both in schools and via partnerships. 
Leavers Positive Destinations
For the first time, we were ahead of all of our comparators for Leavers’ Positive Destinations. This is a significant achievement and one which we
hope to sustain or build on. A total of 90% of our Care Experienced Young People progressed to a positive post-school destination in 2022/23. This
is above both the Northern Alliance authorities and national figures. 
Rural Growth Deal – Skills and Training Programmes for Local People
Over £14m of Rural Growth Deal (RGD) investment will directly support skills and training programmes for local people. This includes £7m of skills
interventions to be delivered via the Rural Skills Accelerator Programme with a focus on enhancing local STEM education (Science, Technology,
Engineering, and Mathematics) tied to economic opportunities, targeted business skills interventions and enhancements to UHI Argyll’s local estate.
UHI Argyll will also invest £7.8m via the RGD to create a marine industry training centre at Dunstaffnage which will provide the skills and training
opportunities locally required by key sectors in the blue economy.  This has key synergies with other RGD projects such as the SAMS Seaweed and

Page 38

38 
Shellfish Research & Development Centre which will enable growth in these nascent sectors alongside more established industries.  We will work
with Stirling University to expand the capacity of the Marine Environmental Research Laboratory at Marchrihanish with a focus on Research &
Development activities around fish health and environmental sustainability.  These interventions will grow opportunities for students to study locally. 
Carbon Literate Organisation (CLO) Bronze Status 
We recognise the importance of a leadership informed and knowledgeable of climate change and sustainability will improve decision making and our
ambition of becoming a net zero organisation by 2045. To support this we successfully completed a programme of Carbon Literacy Training and
obtained nationally recognised Carbon Literate Organisation (CLO) Bronze status.  The training offered to the Senior Leadership Team and
completed by over 65% of Elected Members provides detailed training around climate change decision making, evidence and science.   
Corporate Outcome: Our economy is diverse and thriving   
Number of Indicators: 12 
Number on Track: 10 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Maintain the percentage
of local suppliers that
benefit from the awards
of contracts via the
procurement portal
20.00% 27.90% 27.90% 13.50% 19.90% R
Due to the nature of the contracts awarded in 2022/23,
meant that our local supply base was unable to bid for them.
However, where the type of contracts that local suppliers are
bidding for and which contracts are subsequently awarded to
them is monitored, and 85.3% of local suppliers were
successful in winning bids
Increase the number of
community benefits that
are delivered through the
contracts we award
locally
No Target 2 22 55 73 No
Target
We have been working closely with our suppliers to deliver
additional social, economic and environmental value to our
society and 73 Community Benefits were achieved through
Contract Management, Contract Awards and the Request
List during the period from 1st April 2022 to 31st March
2023. For further detail, please visit:  https://www.argyll-
bute.gov.uk/business-and-licensing/selling-
council/procurement-useful-links-and-documents

Page 39

39 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Number of business and
industry planning
applications submitted
annually
No Target 25 21 19 23 No
Target
This measure details the number of applications submitted to
the Council for business and industry applications. The data
for 2022/23 indicates increased activity in this area from the
previous reporting period.
The percentage of
homeless applicants who
required temporary
accommodation this
period
No Target 44.00% 45.00% 40.00% 34.00% No
Target
The percentage reduction has to be considered in the
context of an increase of 29% in the number of households
presenting as homeless to the local authority in 2022/23
compared to 2021/22. The actual number of households
requiring temporary accommodation increased in 2022/23
but the pro- active housing advice and information provided
by the Area Teams has meant that effective prevention work
is carried out to ensure that as many households as possible
get a positive housing outcome and do not require temporary
accommodation. 
Number of affordable
social sector new builds
completed per annum
Actual 84 48 145 188 G
The Strategic Housing Investment Plan process is a
partnership between the Council, the Registered Social
Landlords and the Scottish Government ensuring that new
build affordable housing is delivered across the local
authority to meet need and demand.
The total number of
visitor trips to Argyll and
Bute (Jan-Dec, STEAM,
Million trips)
No Target 2.9M 0.8M 1.5M 2.5M No
Target
This data is taken from the Scottish Tourism Economic
Activity Monitor (STEAM) the number of visitor trips to Argyll
and Bute increased from 1.5m (Jan – Dec 2021) to 2.5m
(Jan- Dec 2022) – an increase of 67%.
The positive experience for visitors coming to Argyll and Bute
has been assisted by the actions delivered through the
Staycation agenda, which included employing a temporary
post to take forward specific actions on the ground, such as
successful completion of the Motor Caravan Overnight
Parking scheme.
The total visitor spend in
Argyll and Bute (Jan-
Dec, STEAM, Direct
visitor spend - £/M
No Target £364M £125M £262.5M £407.5M No
Target
This data is taken from the Scottish Tourism Economic
Activity Monitor (STEAM) the visitor spend across Argyll and
Bute increased from £262.5m (Jan – Dec 2021) to £407.5m
(Jan- Dec 2022) – an increase of 55%. The positive
experience for visitors coming to Argyll and Bute has been

Page 40

40 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
assisted by the actions delivered through the Staycation
agenda, which included employing a temporary post to take
forward specific actions on the ground, such as successful
completion of the Motor Caravan Overnight Parking scheme.
Gross Value Added
(GVA) per capita No Target 22,767 20,543 23,394 47,270 No
Target
The latest figure of £47,270 is taken from the Scottish Annual
Business Statistics, 2021 (excludes the finance sector and
part of agriculture and the public sector). This is a marked
increase on the previous figure of £23,394 (statistics are in
arrears and do not match financial years). There are
potentially a number of council services/interventions that
directly or indirectly contribute to this productivity measure,
plus external factors.  
Unemployment rate -
Claimant Count as a
%age of working age
population
No Target 2.70% 5.80% 4.00% 2.80% No
Target
The Claimant Count unemployment rate is updated on a
monthly basis (one month in arrears), This figure is the
unemployment rate for Argyll and Bute as a % of working
age population (16-64). The downward trend is positive.
Unemployment rate -
Claimant Count as a
%age of the population
(16-24)
No Target 2.80% 6.50% 4.30% 2.80% No
Target
The Claimant Count unemployment rate is updated on a
monthly basis (one month in arrears) for 16-64 year olds.
This unemployment rate for the % of population, 16-24 year
olds. The downward trend is positive.
The number of business
gateway start-ups per
10,000 of population
No Target 161 110 154.3 135.7 No
Target
It is hoped this figure will improve as Argyll and Bute
Business Gateway Team recently launched a start-up grant
funded by the UK Shared Prosperity Fund. 
Geographical
percentage coverage of
4/5G mobile phone
connectivity 
95.00% 76.00% 77.00% 79.00% 81.00% R
Each mobile network operator manages their own network
as they all use different spectrum frequencies. EE has the
greatest coverage as a result of the Government backed
Emergency Service Network (ESN) contract and a very
aggressive commercial approach. They have built in excess
of 90 masts across A&B over the last 5 years.
Over the next few years there will be significant
improvements as part of the UK Government supported £1B
Shared Rural Network (SRN) due to be completed by 2027.

Page 41

41 
Economic Growth 
The positive experience for visitors has been assisted by the actions delivered through the Staycation agenda, which included employing a
temporary post to take forward specific actions on the ground, such as successful completion of the Motorcaravan Overnight Parking scheme.
Details on the Staycation agenda can be found in this report Staycation Update Paper 
➢ With reference to the Scottish Tourism Economic Activity Monitor (STEAM) the number of visitor trips and visitor spend increased in Argyll
and Bute. 
➢ Visitor trips increased from 1.5m (Jan – Dec 2021) to 2.5m (Jan- Dec 2022). This is an increase of 67% 
➢ Visitor spend increased from £262.5m (Jan – Dec 2021) to £407.5m (Jan- Dec 2022). This is an increase of 55%. 
Supporting the Economic Recovery and Our Communities 
The Procurement, Commercial and Contract Management Team (PCCMT) provided a strong lead to ensure we continued the percentage of Council
spend that is under a contract or service level agreement, while also maintaining the percentage of all Small Medium Enterprises (SME) that win
council contracts. We also worked to improve the delivery of contract management on all high risk contracts. 
2022/23 Contracted Spend: 90.8%. 
2022/23 SME Wins: 87.6%
We effectively planned and coordinated the release of tenders to avoid overwhelming the market, in particular the local market, by issuing invitations
to tender where the regulations allowed. For 2022/23, we awarded 152 contracts and of these 123 were Quick Quotes (ITQ’s).
The percentage of total bids by and contracts awarded to local and SME suppliers is monitored monthly. However, not all requirements can be fulfilled
by the local supply market. To gain a better understanding of performance, the number of tenders bid for, and subsequently won, by local suppliers
is also monitored and detailed below.

Page 42

42 
2022/23 Data
Total No. of Tenders No. of tenders receiving
local bids No. won by local bidders  Percentage success rate of
local bids won to local bids
submitted
152 34 29 85.3% 
The level of local spend was monitored in 2022/23, and the overall percentage with our local suppliers was 37.3% - see detail below: 
Total Spend Local Spend Local Spend
Percentage
2022/23 – Spend
Distribution £163,144,959 £60,856,127 37.3% 
We recognise the importance of maximising the economic benefits from directing Council spend to local businesses in terms of benefiting the local
economy. Whilst it would not be acceptable to give preference to local businesses during any particular procurement, efforts are made to ensure that
local businesses are upskilled so as to have the greatest chance of being successful in winning Council and other public sector business.
We are committed to maximising community benefits from our procurement activities which in turn deliver wider benefits for communities when
contractors purchase the required goods, services and supplies for Argyll and Bute. We have been working closely with our suppliers to deliver
additional social, economic and environmental value to our society. A total of 73 community benefits were achieved in 2022/23 through robust
contract management.
We also simplified and streamlined our procurement processes, ensuring that documentation was as straightforward as possible. To support the
economic recovery and emerging priorities for Argyll and Bute we work closely with colleagues within Economic Development and other
collaborative stakeholders.
The Rural Growth Deal (RGD) will result in contracts totalling £70m to be delivered over 10 years.  As such, there is significant opportunity to use the
RGD investment to deliver enhanced community benefits.  We are working to ensure suppliers meet their obligations with regard to community
benefits.

Page 43

43 
Business Start-Ups and Support – Two Case Studies
The number of business gateway start-ups has dropped slightly over the financial year, but is it hoped this will improve during 2023/24 as the Argyll
and Bute Business Gateway Team recently launched a start-up grant funded by the UK Shared Prosperity Fund.
During 2022/23 we worked hard to ensure that the financial help available to businesses was correctly awarded and quickly paid out. In total we
awarded nearly £18 million of Non-Domestic Rates reliefs to support local businesses. 
The following are two case studies illustrating how Business Gateway has supported these businesses to grow.
Aosdàna 
Based on the Isle of Iona, Aosdàna designs and manufactures contemporary jewellery with a Celtic influence. 
Business owner, Mhairi Killin, founded Aosdàna in 2003. Having operated successfully for almost two decades, most of Aosdàna’s sales were
generated from its gallery on the island, where some of the jewellery ranges are also designed and made. However, like many other small
businesses, pandemic closures and subsequent travel restrictions meant the main source of income for Mhairi dwindled.
During this time, however, Mhairi, together with award-winning jewellery designer Maeve Gillies, won an Innovate UK award to develop a range of
jewellery based on the heritage of original Iona silversmiths, the Ritchies. 
Mhairi approached Business Gateway for support and guidance on how to reach a wider audience and generate global sales for the new range, the
Kist o’ Ritchies. She received 1:1 support from a dedicated business adviser, as well as advice on funding, a strategic review of her business, and
signposting to a wider network.
“Support from Business Gateway has been so beneficial. Not only has their assistance helped me re-evaluate my business strategy, but it has also
allowed me to invest in strong product photography for my website, which will help me greatly when launching into international markets later this
year. I can’t thank Business Gateway enough for their ongoing support.”
The Kist o’ Ritchies collection utilises the latest manufacturing technology to navigate the lack of metalworking skills on the island, preserving the key
historical designs from the 19th and 20th centuries. 
The modern jewellery range will launch in spring 2023 and is expected to attract international markets including the USA and Canada. 
Argyll Yacht Rigger
A Scottish yacht servicing business in Argyll & Bute is thriving after its owner received specialist start-up advice and grant funding from Business
Gateway.

Page 44

44 
Following redundancy during the Covid-19 pandemic, experienced rigger Ian Burton launched Argyll Yacht Rigger, in June 2020. The Tarbert-based
business provides a full range of services for pleasure and commercial yacht owners in the region, from complete re-rigs to installing new masthead
electronics and winter maintenance. 
Seeking to capitalise on this niche area of business, Ian approached Business Gateway in 2020 for advice on setting up his own business. As well
providing start up guidance, his local adviser facilitated specialist support which included employment advice and expert help on business growth
and resilience. This support was crucial as Ian looked to build the business during the pandemic. 
Business Gateway also signposted grant funding, helping Ian access financial support to expand.  This included support from the Local Growth
Accelerator Programme, funded by Argyll and Bute Council and the European Regional Development Fund (2014-20) Structural Funds Programme.
With a referral made from Business Gateway, Ian was also awarded funding from Highlands and Islands Enterprise. 
The grants enabled Ian to purchase higher-quality equipment, allowing him to deliver a wider range of services, increase capacity and cover a wider
regional area. The growth has resulted in Ian employing a second member of staff with plans to hire an additional full-time rigger this year. 
Ian said: “Starting your own business, especially in a rural area, can be daunting, however, the support of Business Gateway has been vital to a
successful launch in 2020. Working throughout the pandemic, I was determined to expand the business and it was with the funding that Business
Gateway helped me to secure that I was able to do this. I have now taken on my wife as my first employee to help with my bookkeeping, which has
been an important function for us to maximise earning hours.”
Mitigating the Delays for Taxi Licencing
As the licensing authority we must be satisfied that the health of individuals issued with a Taxi Licence to meets our expectations. In order to do this
we contact their Doctor on receipt of an application. We realised that customers were experiencing significant delays in receiving a response from
their Doctor. This in turn meant that customers could not receive their licenses timeously and therefore could not trade. This had inevitable negative
economic consequences, with the frustration experienced by our customers made clear to us, both verbally and in writing. 
We are committed to using all forms of customer interaction to help us identify possible service improvements and offer better choices. As a result of
the clear frustration described in the communication we undertook a period of consultation. We contacted all 389 private hire/taxi drivers and
operators in the area asking for their feedback on a proposed solution of engaging the services of an external agency to undertake the required
medical check.
This solution was endorsed by customers and has since been implemented, we have the required confidence to issue a taxi licence, customers do
not face delays in the processing of their applications and negative economic consequences are reduced. 
Generating Income for the Council  
We have generated over £560,000 by selling off surplus property assets and generated annual income of £31,750.  This is part of our strategy to
divest surplus property assets and generate income from our estate.

Page 45

45 
Notable sales include:
➢ The former Innellan Primary School 
➢ The conclusion of the Castle Toward sale
➢ The marketing of the Helensburgh Waterfront commercial site, which attracted 9 international, national and local bids for the site with a
significant local community engagement exercise undertaken. 
➢ Oban Airport marketing has generated 3 significant aviation related business interests for the business park. These will be identified with the
outline business case to be completed in 2023. 
We are developing a Strategic Outline Programme. This will cover potential opportunities for the Council to develop a number of its assets on a more
commercial basis and will be delivered over a number of years, with the immediate focus being a new Business Park at Kilmory, and commercial
developments at Helensburgh’s waterfront.
We secured ongoing commercial planning / building standards work from other local authorities. Not only is this important for us to provide a
balanced budget, but it also supports communities in these other Council areas.
Events and commercial catering continues to grow with the recent addition of a new commercial café this year -The Pier Point Café, Helensburgh
and Lomond Civic Centre in late 2022. Work is well underway to open another commercial café, the Corranbuie Café, Tarbert Holiday Park in July
2023. Event and commercial income is slowly recovering from the impact of the pandemic, with a number of large festivals and private weddings
having been hosted throughout the course of the year.
Rural Growth Deal – Two Projects Growing Visitor Numbers 
The RGD includes a tourism and place programme which will focus on 2 local projects aimed at growing visitor numbers in the region.  The Kintyre
Seasports project will regenerate Campbeltown Sailing Club to provide a facility which can grow marine based tourism activities in Kintyre.  This will
build on the successful programmes already being delivered by Kintyre Seasports which has 10% of the Campbeltown Grammar School role
enrolled.  This facility will also enable an uplift in local events such as community regattas and sailing competitions which will result in an estimated
700 more visitor trips to the local area per annum.
The RGD will also invest £9m in Rothesay Pavilion which will significantly reduce the funding gap on this project.  The Pavilion has the scale and
ambition to be transformational for Bute and will provide a key visitor attraction when complete. This will include a fully refurbished and equipped
main auditorium with sprung dancefloor and a capacity of up to 800 seated and 1200 standing; a new second venue with a capacity of 80-100; a
contemporary gallery space; shop and box office; café; two bars; meeting room; music and media education studio; and supported office space. In
addition, there will be outdoor seating and landscaped garden areas.  Programming during the high season will target visitors (short stay and day)
with festival-based and themed events and high-quality unique exhibitions. Examples will include vintage fairs, comedy weekends, beer and food
festivals, family shows, and dance holidays. These will link in with other tourism and cultural organisations on the island to ensure joined-up
experience-based and holiday focussed marketing with an emphasis on the cultural tourist.

Page 46

46 
Rural Growth Deal – Mull Housing Pilot 
As a result of successful funding applications the progress of the Rural Growth Deal Housing Pilot has been accelerated. We are now able to press
ahead with preparations for the delivery of much needed worker housing in Tobermory, Mull. This need was initially identified by research
undertaken by the Mull and Iona Community Housing Trust. Restrictions to economic growth as a direct result of the shortage of housing for workers
were identified.  The Housing Service is working with Mull and Iona Community Housing Trust (MICHT) to devise a housing type and tenure model
which will, if successful allow MICHT to operate as managers of a bespoke property leased to them by the Council.  
This will then provide accommodation for workers in the local economy, either for seasonal work, and or a landing pad type accommodation for
those who have arrived on the island to take up permanent positions.  This is a pilot project and has the potential to be rolled out further.  A site start
is currently planned for April 2024, subject to securing the necessary planning, building control and roads consents.
Clyde Engineering and Innovation Cluster  
The Clyde Engineering and Innovation Cluster (CEIC) project will be supported with up to £7m from the UK Government. The impetus for this project
comes from the expansion of HM Naval Base (HMNB) Clyde through the Maritime Change Programme (MCP). The MCP will consolidate the UK’s
submarine fleet and all its support services to HMNB Clyde. 
The Rural Growth Deal provides a unique opportunity to support this transformational programme of change and maximise the local economic
benefits. This project will deliver new, modern commercial business space. It will also represent Phase 1 of a potential business and engineering
cluster at Colgrain Business Park near Helensburgh. 
In developing the CEIC proposals we have been working closely with key partners including the MOD, Royal Navy, Scottish Enterprise and key
industrial partners currently delivering services at HMNB Clyde.
The Rural Growth Deal investment aims to:-
➢ Maximise the economic opportunity from the £1.3bn investment into HMNB Clyde. 
➢ Secure the economic opportunity for Helensburgh and Lomond and the wider Argyll and Bute area by addressing the current lack of available
commercial accommodation. 
➢ Providing modern, commercial accommodation will support the development of engineering and supply businesses. 
West Coast Unmanned Aerial Vehicle (UAV) Logistics and Training Hub  
This project will be supported with investment of up to £4m from the UK Government subject to the approval of a full business case.

Page 47

47 
This project will invest in new business park infrastructure at Oban Airport. Recent trials using drone’s to provide essential services to some of the
most fragile rural and island communities have been successful. The investment will enable it to become a leading innovative research and
development centre for UAV technologies.  
The centre will deliver Scotland’s first specialised drone training and research centre.  Providing enhanced Research & Development capabilities,
space for UAV pilot training, laboratories, and lecture suites. The UAV Hub will also provide state of the art hangars with maintenance facilities for
UAVs and general aviation aircraft.  Oban Airports’ position on the West Coast of Scotland will also provide enhanced capability to trial Beyond
Visual Line of Site (BVLOS) flights in controlled airspace. This will support the safe integration of UAV’s and general aviation traffic across the UK,
future-proofing our airspace for all users.
Corporate Outcome: We have an infrastructure that supports sustainable growth 
Number of Indicators: 5 
Number on Track: 5 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
The percentage of waste
that is recycled,
composted or recovered
45.00% 43.80% 49.30% 48.30% 52.00% G
There was an overall improvement in recycling performance
in 2022 which was mainly due to an increase in green
garden waste and wood waste tonnages sent by Renewi
from the PPP area for onward composting and recycling. 
There was also an improvement in recovery performance in
2022 mainly due to a trial carried out by Renewi in the PPP
area whereby Renewi sent circa 1,500 tonnes of general
mixed residual waste (mainly from their Dalinlongart waste
facility near Dunoon) to an Energy from Waste (EfW) plant in
the central belt
The number of tonnes of
waste sent to landfill
(Biodegradable) 
21,500 18,577 18,435 18,772 18,165 G 
The annual tonnage of biodegradable waste to landfill has
reduced from previous years calculation of tonnage. Based
upon the current annual tonnage, there is a significant
reduction of waste to landfill. The reduction is 3,335 tonnes
based upon the corporate level specified at 21,500 tonnes.

Page 48

48 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary 
Percentage of street
cleanliness 73.00% 79.00% 81.00% 79.00% 83.00% G
The level of street cleanliness throughout Argyll remains at a
very good standard on the areas which Keep Scotland
Beautiful have highlighted for inspection.  The national
standard has a pass rate of 67% however the service has set
its own target of 73% and remains well above this target.
The percentage of roads
in need of maintenance
as defined by the annual
survey
No Target 54.20% 52.50% NO DATA 49.70% No
Target
The covid-19 pandemic interrupted the 2019-20 and 2020-21
annual road condition assessment programmes which meant
island roads were unable to be surveyed. However this
year’s survey results show a marked improvement in overall
condition since the last normal survey from 54.4% to 49.8%.
The results also show, for the first time in the last 8 years of
reporting, that more than half our road network is within the
green or good condition band, which demonstrates the
success road maintenance teams have achieved across the
authority. 
Carbon emissions
relating to Council
activities (Council carbon
footprint) tCO2e =
tonnes of carbon dioxide
equivalent
Net Zero
tCO2 by
2045
28643 26619 28218 26,512  G
There has been a reduction of 1,705 tCO2e on total
emissions for the previous year.
Projects delivered by the Council that have contributed to the
reduction in emissions include:
• LED Streetlight Replacement programme 
• Solar pv and LED lighting installations at Council assets
• Installation of low carbon heating systems (e.g. air source
heat pumps) 
Flood Protection and Marine Works
We have progressed our assessments, watercourse clearance works, flood incident investigation and provision of flooding advice. A watercourse
inspector along with additional engineers have been recruited to assist the flooding team, these posts will help to deliver the council’s obligations in
terms of Flood Risk Mitigation.

Page 49

49 
Campbeltown Flood Protection Scheme
Construction of the Campbeltown Flood Protection Scheme started on site in
September 2022.  It is the first scheme to be promoted by Argyll and Bute
Council under the Flood Risk Management (Scotland) Act 2009. Budgeted to
cost £15.215M and funded 80% by Scottish Government and 20% by Argyll
and Bute Council.
There are a number of elements to this piece of work. Essentially, surface
water has been removed from the combined foul drainage system, this
reduces the amount of water that needs to be treated in the sewage
treatment works. This required the construction of a storage tank under
Burnside Square, small ponds on the “Meadows” and the construction of a
reservoir to the south of Snipefield Industrial Estate were also required. 
These ponds and the reservoir will remain dry for the majority of the time, and
will provide holding capacity during a storm event, where water will be held
and ultimately slowly discharged into the sea. 
Both the “Meadows” and the “Burnside” sections of the work are largely complete with final works planned for Sept/October 2023. Burnside Square
is open to the public, with car parking to be available shortly. Road resurfacing is ongoing along the streets where pipework installation has been
completed. Work on the “Millknowe” section (the flood storage reservoir) is ongoing. The Contractor has completed piling works and has
substantially completed the embankment and spillway structure. The “Dalaruan Street” section (for culvert upsizing) is the final phase to commence
which will also enable utility works to commence.

Page 50

50 
First photo shows the reservoir which will be dry the majority of the time, only holding water during a flood event.
Second photo shows the drilling rig used to insert the steel sheet piling which forms the walls of the reservoir. 
Third photo shows Burnside Square during the construction of the tank.
Additionally we have progressed to a cloud based Flood Risk Management System which enables flooding information to be held in a safe and
appropriate format.   
Piers and Harbours 
Marine Infrastructure and Ferry Services
The restructure of our larger harbour infrastructure and reviewed legislation have led to an additional number of Piers and Harbours. Argyll and Bute
Council is the Statutory Harbour Authority at 7 locations and a marine asset owner at a further 29 marine facilities located throughout the Council
area. All remedial actions required to close out audit findings have been completed, with the ongoing audit regime visiting Rothesay later this year. 
Ferry Services
All our ferry routes operated according to timetable with additional sailings put on to cope with increased demand. We are reviewing the previous
works and studies carried out around the ferry services we provide and the infrastructure they need now and for the future.
The replacement of the Jura ferry remains the priority and work is underway towards the installation of appropriate passenger access at Feolin on
Jura. We have undertaken a topography study at Feolin with a view to tendering a design build for the passenger only access for those periods

Page 51

51 
when the vehicular vessel is not available. This will make a very significant improvement to the connectivity issues when there is a breakdown on the
Eilean Dhiura and will likely be in the form of a gangway and pontoon near the existing slipway. 
Tobermory Wall and Rails
The council secured funding in the region of £450k to make improvements to the front rails at Tobermory Main Street and help alleviate some of the
flooding issues associated with Tobermory. A new higher wall was installed to which the upgraded rails were attached to, as well as a flood
barrier/gate and flat valves. As part of this project the council will also be making road
surfacing improvements to the area of car parking adjacent to the wall.
Design details were discussed with stakeholders to accommodate the wishes of the pier
users such as realigning the flood barrier to reduce impact to the pier stones. From this
design the council obtained a listed building consent and secured a local contractor through
the tendering process. The council has been physically supervising the site on a weekly basis
and continue to maintain contact with the affected stakeholders as such. This has enabled
revising construction sequences to address summer tourist season for directly affected
businesses. 
The majority of the works programme is targeted to be complete by December 2023 with the
flood barrier construction across Fisherman’s Pier to be completed in January/February 2024. 
Oban Harbour Revision Order
Informal discussion have been ongoing to finalise the Oban Harbour draft Harbour Revision Order (HRO). The draft HRO has undergone some
changes to the content order, formatting and points of specific interest e.g. definitions and references.
A final draft of our Harbour Revision Order for Oban was approved for submission to Transport Scotland by the Harbour Board. The formal part of
the process will now proceed, including public consultation.   
The Terms of Reference for the proposed Consultative Forums have been drawn up. These are based on the guidelines and recommendations of
the Port Marine Safety Code (PMSC). It is proposed to have two Consultative Forums. One will be a group consisting of the organisations with
financial and legal responsibility in the bay. The other will consist of the stakeholders and communities who rely on Oban Harbour. 
Recruitment has been completed to ensure a smooth first step is made in preparation for the new shift patterns once the HRO is in place.

Page 52

52 
Iona Slipway and Breakwater
The Breakwater planning application is progressing with a view to tender later this year. The contract is expected to be awarded summer 2024 with a
completion date of summer 2025. However, it should be noted that the present forecast of a 1 year construction period may be subject to the
contractors work scope and supply chains, particularly the rock armour. 
We have received a quote to complete the Slipway work started by the previous contractor. There are some issues to finalise which are being
addressed. Due to the nature of some issues we initially had no returns from known contractors, this can signify problems with completing the works. 
We are currently considering the issue and comments, views and thoughts from the pier users have been requested. 
Fionnphort
The work to progress key pieces of marine infrastructure to allow for full and unfettered access to and from Iona is ongoing. The Environmental
Impact Assessment is in process including the socioeconomic assessment. Work is ongoing to address the potential issues with CalMac Marine
regarding swept paths etc. Once Marine Scotland have approved the Environmental Impact Assessment we will continue with the licences, etc. with
a view to tender in the summer of 2024 approx.
Port Askaig
In April 2018, Scottish Ministers announced that Islay would be next in line for new vessels to replace the MV Hebridean Isles. As part of the New
Islay Vessels (NIV) Project, the Port is being assessed and upgraded to accommodate the larger capacity ferry with the first vessel expected to be
delivered by October 2024 and will enter service following sea trials and crew familiarisation. The second vessel will follow in early 2025. 
Land Based Developments 
Road Reconstruction
During this financial year we carried out a programme of road improvements. The Council invested nearly £10m with additional funding from the
Timber Transport Fund in the region of £1m. This allowed us to complete over 80 individual road reconstruction schemes which will improve the
overall road network, contributing to keeping Argyll and Bute open for business. As a result of this ongoing prudent investment and proportionate
and appropriate engineering choices, the overall road condition continues to improve, and we recorded the most improved road condition in over 15
years.

Page 53

53 
Road Condition Improvements
Continuing the trend of improvement / arresting the decline in our road network, Our Annual Status and Options Report sets out the benefits of
continued investment in our road network and highlights the critical risk of underinvestment. 
Although our network has seen a welcome improvement in recent years, we would need to spend in the region of £10-11million annually to maintain
a ‘standstill’ position, and significantly more to see continued improvements. Year on year budget consultations and public feedback has shown the
importance of roads to our communities – maintaining the required level of investment is likely to be challenging in future years given the predicted
decline in available capital funding. This brings with it significant engineering, economic, financial and reputational risks for the Council. 
We continue to deliver a range of different technical solutions that are designed to be proportionate for the use of the road and take into
consideration the island and rural geography of Argyll and Bute. 
Winter Maintenance
The council is responsible for carrying out winter maintenance, the removal of ice and snow, to its
2,300km of road. There is a network of roadside weather stations which together with specialist
forecasting surveys provide bespoke treatments across the council area utilising 32 separate routes. 
Key facts from this winter season: 
• 66 full fleet runs 
• 2,238 individual vehicle runs 
• Highest turned out route A819 Inveraray to Dalmally 
• Total distance travelled 105,902 miles 
• Salt used 12,535 tonnes 
• Total spend £2,661,350.04 
Bridge Maintenance and Renewal
We previously secured £5.5m funding through the Scottish Government Local Bridge Maintenance Fund. This was a hugely competitive fund
available to all Scottish local authorities. We received the second highest grant which allows us to replace / strengthen 9 existing bridges. To date
each bridge has been through an assessment and design process involving various stages including Ground Investigation (GI) where new bridges
are required. This GI work is being used to inform the detailed design, construction methods etc. Work will be ongoing into 2023/24 financial year

Page 54

54 
The bridges to be replaced and the work status are:
• A849-280 Pennyghael Bridge (Feasibility Report Completed) 
• A816-120 Oude Bridge (Public Consultation in October) 
• B844-010 Kilninver Bridge (Feasibility Report Completed)
• A846-270 Glenegedale (2) Bridge (Public Consultation in October) 
Bridges to be strengthened and the work status are:
• B842-150 Whitestone Bridge (Works to be tendered Autumn/Winter) 
• B842-010 Claonaig Bridge (Under Detailed Design)
• A815-230 Cothouse Bridge (Works to be tendered Autumn/Winter) 
• B839-050 Lochgoilhead Bridge (Under Detailed Design)
• B840-140 Ardchonnell Bridge (Tender Works Awarded) 
Additionally during 2022/23 we carried out a total of 23 major maintenance schemes along with a number of minor
maintenance works on road structures. 
Claoniag Landslip
This project has been progressed by a specialised geotechnical consultant. The detailed design is slightly complex as the hill is sliding / moving
down towards the stream and therefore complicating the solution. A tender package is in the process of being developed alongside continuous
consultation with the landowner, SEPA and Openreach. There are a number of complexities affecting this project including work consents, land
acquisition and challenging ground conditions. 
In the meantime the council continues to monitor the landslide.

Page 55

55 
Tobermory Cemetery Expansion
There was limited burial capacity in Mull. To resolve this an £820K extension to the existing Tobermory site was constructed. This has increased the
number of lairs by 192, with each lair being 3 deep. 
Protecting the Drinking Water Supply 
In line with The Water Supply (Water Fittings) (Scotland) Byelaws 2014, Scottish
Water require a number of piers under Argyll and Bute Council ownership to be
upgraded. This is to ensure private and local public water supplies are protected
from any backflow contamination and that harbours / terminals / pontoons etc. are
adequately protected. 
We are currently working on four sites - Oban, Campbeltown, West Loch near
Tarbert and Carradale that require upgrade works. A Contractor has been
appointed and work has commenced at three of the four sites. All four sites are expected to be completed late
in 2023.

Page 56

56 
Deliver the ICT and Digital Strategy Action Plan - Our aims   
➢ Our networks and systems are secure, accessible and current 
➢ ICT provides value, and enables and empowers both customers and staff to make tasks easier 
➢ Our people have the knowledge and capabilities to use ICT effectively 
We continue to network and engage with Scottish Local Government Digital Office, Society For Innovation Technology and Modernisation (SOCITM)
and Scottish Government Digital Team. This engagement helps ensure that we achieve best practice, share our ICT and digital experience and
expertise, and achieve the highest levels of value for money we can through active procurement and contract management. 
The 2021-24 ICT and Digital Strategy Action Plan has approximately 100 actions. The majority of actions are progressing satisfactorily and to target.
Along with highlights noted below from the 2021-24 ICT and Digital Strategy Action Plan we have managed to maintain the average time to resolve
ICT incidents. We have operated well within our service level targets with service levels at or above previous levels and our response times were as
good as previous years.   
Microsoft365 (MS365)
We led on the national project for MS365, working with the NHS and Digital Office to provide shared MS365 calendars, address books, distribution
lists, instant messaging and presence management across NHS and Council MS365 platforms. 
Within the Council, phases 2 and 3 of the M365 project are now being implemented. A Council-wide support network of Digital Champions has been
set up to encourage more efficient and effective use of M365 across the organisation along with the introduction of an extensive M365 training
programme. 
ICT Partnership Working
We continue to work closely with the NHS to improve efficiencies and removing work barriers. Council staff now have access to the NHS ICT
system. Now both Council and NHS staff within the Health and Social Care Partnership (HSCP) have access to systems in both organisations which
greatly improves efficiencies and customer service.
We are providing an opportunity for sharing public sector resources by addressing common challenges and working together to improve outcomes
for Argyll and Bute. We continue to develop and promote the use of our #abplace2b campaign. The campaign promotes the area as a great place to
live, work; and to attract the people, skills and investment the area needs. 
We have refreshed our abplace2b.scot website and developing the use of it by our partners, for example the HSCP is using it for its recruitment
campaign.

Page 57

57 
We have also assisted Live Argyll with the ICT aspects of the new Helensburgh Waterfront Development (HWD). 
New Ways of Working with ICT and Data
As well as the day to day challenges of managing a high profile IT network we have implemented a raft of improvements to support working
efficiencies. These include a new self-service facility with our ICT Service Desk system and working with finance colleagues to introduce the new
Oracle Cloud financial management system 
We are currently developing and implementing a new Data Strategy. A key aim of this strategy is to evaluate, design and implement a new Data
Platform. Not only will the Data Platform enable us to measure and report on performance, importantly we will be able to combine data sets and
make better use of our data to help improve decision making at all management levels, thereby ensuring that evidence based decisions are made. 
Capital Investment and Central Repairs Delivered
We have successfully delivered a programme of capital investment totalling £7.5M. Included within the wide variety of investment projects were 50
projects relating to energy efficiency, reducing fossil fuel consumption and renewable energy generation.  This included solar panels, air source heat
pumps and new automated control systems in our buildings, mainly in our schools.   
As well as delivering the additional investment projects the emergency, planned and statutory maintenance programmes were successfully
delivered, resulting in improved customer satisfaction. Additionally a separate large-scale project reviewed the water, waste water and drainage
charges for the Council. The results of this project has delivered one-off refunds in the region of £500,000 and year-on-year savings of more than
£100,000 per annum. 
Helensburgh Waterfront Development
The new facility features a 25-metre main swimming pool and training pool, luxury health suite with steam room and sauna, a café and shop, fitness
studios and a gym with panoramic views of the Clyde.  The centre, operated by LiveArgyll, is fully accessible and includes a changing places facility,
a floating moveable floor in the training pool and poolside pods for anyone with mobility issues to access the pool independently.  
The completed leisure and public realm development was a ‘Placemaking’ finalist in the national Planning Awards 2023 and was shortlisted for ‘’Best
Construction Projects GB&I’ for the Construction Employers Federation (CEF).

Page 58

58 
Our Workspace – Reducing Costs and Increasing Efficiencies 
Our Modern Workspace project is progressing well. The project is reviewing how we use our workspace, reduce costs and increase efficiency. Four
Hub Buildings are now complete with two due for completion by the end of 2023. Ten under-utilised buildings have been repurposed or mothballed.
The entire project (excluding Lochgilphead) is being delivered through existing capital programme budgets and Scottish Government Place
Demonstrator Funding (£664K awarded to deliver Rothesay Project). 
The Project has delivered significant savings from rationalising shared offices through – 
➢ Non-Domestic Rates relief on the buildings that have been closed.
➢ A reduction in utility consumption. 
➢ A reduction in cleaning costs.
➢ A reduction in the number of printing devices required 
➢ A reduction in paper and the need to print as we adopt a more digital approach to Service Delivery.
➢ A Reduction in annual ICT network charges, such as ISDN lines and broadband charges.
➢ Reduced ongoing cost pressures for replacement of network equipment (Wi-Fi access points / server switches etc.), where possible network
equipment has been utilised in other locations. 
These savings and ease on cost pressures will continue to grow as the Our Modern Workplace project continues to deliver town by town 
Carbon Emissions Relating to Council Activities
In line with Government requirements, all Rural Growth Deal business cases require to include carbon management plans detailing how whole life
carbon emissions on projects will be managed throughout the lifecycle of these investments.  As such, all infrastructure delivered using Rural Growth
Deal funding will require to be designed to be as energy efficient as possible (with the fixed funds available). The  Rural Growth Deal - Programme
Management Office (PMO) also chair the National PMO Decarbonisation Sub Group which is a forum including all growth deal teams in Scotland
where best practise relating to decarbonisation and the journey towards net zero is shared This group includes policy leads from the Scottish
Government. 
Rural Growth Deal – Islay Low Carbon Project
As part of the RGD we are also developing a project for Islay with a focus on the journey towards net zero.  Due to grid constraints this has focused
on local, domestic retrofit however, there is an opportunity to work with the distilling industry to look at using £3m via the Rural Growth Deal to
undertake a larger scale project be levering private sector investment.  Bio-gas or waste heat are options being considered but this is in the early

Page 59

59 
stages and subject to commercial sensitivities.  The Rural Growth Deal will feed into the work being undertaken as part of the Scottish Governments
Carbon Neutral Islands programme as Islay is one of six Scottish Islands included.  This will require a whole systems approach focusing on grid,
renewable energy, transport, heat, land use etc. 
Corporate Outcome: Getting It Right       
Number of Indicators: 5 
Number on Track: 4 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
Increase the percentage
of all Self-Service and
automated contacts
72.00% 71.10% 71.10% 73.10% 75.00% G
The target was to achieve 72% of self service or automated
contact interactions through the Contact Centre and online
channels, and the actual final percentage was 75% (up from
73% in 2021/22), with total interactions increasing to 598K
(up from 563k in 2021/22) of which 450,440 were automated
or self-service and only 147,460 were mediated. Of the
mediated transactions, 67% were telephone calls, 14% face
to face through service points and 11% were emails
Sickness absence days
per employee (non-
teacher)
No Target 12.3 Days 10.0 Days 13.4  Days 14.3 Days No
Target
In 2022/23 LGE staff absence has increased by 0.90 work
days lost per FTE to 14.3 days.  The top three reasons for
sickness absence were 1.  Stress/Depression/Mental Health;
2.  Infections and 3.  Other Musculoskeletal Problems. From
1 July 2022 Covid absences began to be recorded under
normal sickness absence, along with no Covid restrictions it
is likely to have accounted for infections moving into the top
3 reasons for absence.  The increase in sickness absence to
beyond pre pandemic levels mirrors the national picture with
data from the Office of National Statistics which showed that
the number of working days lost hit a record high in the UK in
2022 (calendar year).
Sickness absence days
per Teacher No Target 7.7 Days 4.4  Days 5.6  Days 6.2 Days No
Target
In 2022/23 Teachers absence has increased by 0.60 of a
day to 6.2 work days lost per FTE.  The top three reasons for
sickness absence were 1.  Infections;

Page 60

60 
Corporate Outcome
Indicator Target Actual For
2019/20
Actual For
2020/21
Actual For
2021/22
Actual For
2022/23 Status Commentary
2.  Stress/Depression/Mental Health and
3.  Stomach/Liver/Kidney/Digestion.  From 1 July 2022 Covid
absences began to be recorded under normal sickness
absence, along with no Covid restrictions it is likely to have
accounted for infections moving into the top 3 reasons for
absence.  The increase in sickness absence to beyond pre
pandemic levels mirrors the national picture with data from
the Office of National Statistics which showed that the
number of working days lost hit a record high in the UK in
2022 (calendar year).
Level of employee
satisfaction TBC            Awaiting Survey Launch
Level of customer
satisfaction
92.5%
(Combined) 93.40% 95.60% 92.00% 97.60% G
The Customer Engagement Team closely monitors all
aspects of customer satisfaction across the various channels
and services used by customers and the 2022/23 outcomes
were very positive:
- The Customer Service Centre had 967 survey respondents
to its survey of telephone callers and averaged 96%
customer satisfaction
- The Registration Service had 333 respondents to its service
satisfaction survey with a 98.7% satisfaction rating
- There were 975 users of the Customer Service Points who
completed a survey and 95.8% of them were satisfied, with a
very small number of comments about walk in opening
hours. 
- The corporate website had an 86% overall satisfaction
rating with the transactional forms element being higher at
92% and the new marriage website at 96.4% of satisfied
visitors. 
Naturally all returns were analysed to determine if any
improvements were needed, but comments were
overwhelmingly positive and where staff were named the
feedback was passed on to them.

Page 61

61 
Responding to our Customers on Time
Where possible the Targets for Freedom of information requests, Subject Access Requests and Complaints Resolved at Stage 1 were met. All of
which have been impacted by Covid and high volumes of requests. 
Increasing the Use of our Website and Self-Service Tools 
The target to increase the percentage of all Self-Service or automated contacts through the Contact Centre and online channels was 70%. 
The actual percentage achieved was 75%, this is up from 73% in 2021/22. The total number of interactions increased to 598,000, up from 563,000 in
2021/22. 
Table showing the volume of all transactions by financial quarter during 2022/23 
Many of the automated and self-service interactions were driven by the high usage of the corporate website, which for the first time had over 4
million page views in a year and over 35,000 online forms were submitted. 
During the year the Web Team were very focused on the building of the new corporate website ready for launching in 2023/24. Even so, there was a
raft of new features and services that encouraged the continued shift to digital, including:
➢ The roll out of the online webchat bot ‘Abbot’ and Smart Assistant to all web pages which was used 5,733 times.
➢ The launch of the new Google smart speaker system, complementing the existing Alexa service. Together they have been activated by more
than 2,000 customers; largely to receive bin day related information and alerts.
➢ The creation of a range of online, interactive, cost of living support resources. These include the Scotland Loves Local Card, the Flexible
Food Fund and the preloved school uniform recycling initiative.

Page 62

62 
➢ The continued roll out of new School websites, so much so that at year-end 43 schools have live sites with a further 22 schools at various
stages of completion.
➢ Three new online processes in relation to Primary and High School pupil registration and the Summer Schools Activities Programme.
➢ A very significant set of online resources for the new Short Term Lets licensing laws with online application form and register of applications. 
We continued the focus on making the online resources as accessible as possible. The website averaged a score of 98 out of 100 on the
independent Silktide index. This index is the global accessibility league table of all public websites. To further support access to our online resources
by our customers that have visual and language related issues we invested in upgraded “Reachdeck”, which is supported browsing technology. 
Our voice automated services also continue to be very popular with 46,000 switchboard and payment transactions totalling £1.5M were made using
the service. 
Overall the shift from expensive mediated activities to low cost digital channels in 2022/23 resulted in £940,000 worth of efficiencies, continuing to
build on the efficiencies of the previous years: 
Table showing the volume of transactions that have shifted to digital and the total value of monetary saving by financial year 
Improving Our Customer Service
Being informed and involved about issues, services and opportunities affecting them plays an important part in customer satisfaction. Officers are
supported with developing the survey content and promoting surveys on different topics. 
The Customer Engagement Team closely monitors all aspects of customer satisfaction and the 2022/23 outcomes were very positive:
➢ The Customer Service Centre had 967 survey respondents to its survey of telephone callers and averaged 96% customer satisfaction.

Page 63

63 
➢ The Registration Service had 333 respondents to its service satisfaction survey with a 98.7% satisfaction rating.
➢ There were 975 users of the Customer Service Points who completed a survey and 95.8% of them were satisfied, with a very small number
of comments about walk in opening hours. 
➢ The corporate website had an 86% overall satisfaction rating with the transactional forms element scored 92% and the new marriage website
scored 96.4% satisfied visitors. 
All returns were analysed to determine if improvements could be made, but comments were overwhelmingly positive and where staff were named
the feedback was passed on to them.
We are continually working to improve our customer service. Both Building Standards and Legal and Regulatory Services not only achieved
reaccreditation but increased the number of Compliance Plus elements awarded. 
Other ways that we are improving our customer service experience is the digital “User forum” for Building Standards customers to highlight issues
with the service, changes to the Technical Standards, how this impacts on the customer and an opportunity to discuss their issues.
Supporting our Community Councils
We oversaw the successful delivery of Community Council Elections in October 2022.  A review of the Scheme for the Establishment of Community
Councils was also undertaken and agreed at the end of September 2022. A total of 54 of a possible 56 Community Councils are now formed and the
team attended all 54 inaugural meetings to formally set up the Community Councils. 
We continue to develop social media to help communities get the support they need, for council and communities to work together through
engagement exercises, and promoting council and area challenges and opportunities. Our combined corporate social media channels grew by 10%
last year. Our use of social media successfully signposted 80,000 people to the information they could access quickly and easily on the council’s
website. 
Local Government Elections and Supporting New Elected Councillors 
We delivered the Local Government Elections in May 2022 and the subsequent induction process for our 36 Elected Members.  These elections
resulted in a turnover of more than 50% of Members. This posed a significant challenge to ensure that all Members are prepared and able to carry
out their roles.  Along with delivering the Local Government Election in May a review of Political Management Arrangements was concluded in
advance of the new Council being elected. Post-election activities include relevant training for those appointed to the Regulatory Cohort, the Audit
and Scrutiny Committee and supporting the new Policy Leads into their roles.
The Elected Member case management system has been reviewed. This has resulted in a new, more self-service system being introduced called
“Member Zone”. The new system is more user friendly and enables our Elected Members to operate the system to manage their constituent queries.

Page 64

64 
Looking After our Financial Assets
➢ The Council’s Counter Fraud Team is in place in order to enhance the Council’s zero tolerance to fraud and protect the public purse. During
2022/23 the team rebilled £877k as a direct consequence of their work and have recovered £684k of that total to date. 
➢ We collected 96.72% of Council Tax exceeding the target of 96.00%. 
➢ Positive External Audit Annual Audit Report received and reported to Council in November 2022. 
➢ Financial monitoring packs and Budget Outlook were submitted to each Policy & Resources Committee. 
➢ The average investment rate for 2022/23 was 2.149% and the investments generated £2.178m of interest during the year.
➢ We processed 98.39% of invoices due within 30 days, exceeding the target of 95.5%. 
➢ The 2022/23 internal audit plan was fully completed and reported by the target date of the June Audit and Scrutiny Committee. The external
audit of the Housing Benefit subsidy claim of £16.792m was completed by the statutory deadline and an unqualified audit letter was received.
➢ The external audit of the Council’s Non-Domestic Rates Income (NDRI) Notified Return of £34.886m was completed by the statutory
deadline with an unqualified audit certificate being received. 
Retaining Our Skilled Workforce
The council is a large employer in Argyll and Bute and the majority of our workforce live in Argyll and Bute. Redundancies of council staff may
therefore affect the overall unemployment figures for our area. In 2022/23 80% of employees who were at risk of redundancy were successfully
redeployed by finding suitable alternative roles for them within the council. This helped us to keep people in employment, retained valued skills
within our workforce and saved the council £1.7million in severance costs.
Consultations – We Asked, You Said, We Did 
We want to ensure that proposed developments are what our citizens and communities want. To help us obtain your views we post our consultations
on our website. The following link will take you to the ‘closed’ consultations which relate to this reporting period. Consultation Results | Argyll and
Bute Council (argyll-bute.gov.uk)