Page 1

Agenda 
West Dunbartonshire Council 
Date:  Wednesday, 29 March 2023
___________________________________________________________________ 
Time:  16:00
___________________________________________________________________ 
Format:      Hybrid meeting 
___________________________________________________________________ 
Contact:    Carol-Ann Burns, Senior Democratic Services Officer  
Email: carol-ann.burns@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of West Dunbartonshire Council as detailed above.   
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive 
Page 1

Page 2

Distribution:-
Provost Douglas McAllister Councillor Michelle McGinty
Councillor James Bollan  Councillor June McKay
Councillor Karen Conaghan  Councillor John Millar
Councillor Ian Dickson  Councillor Lawrence O’Neill
Councillor Diane Docherty  Councillor Lauren Oxley
Councillor Craig Edward  Councillor Chris Pollock
Councillor Gurpreet Singh Johal Councillor Martin Rooney
Councillor Daniel Lennie Councillor Gordon Scanlan
Councillor David McBride Councillor Hazel Sorrell
Councillor Jonathan McColl Councillor Clare Steel
Councillor James McElhill  Councillor Sophie Traynor
Chief Executive
Chief Officers
Date of issue:  16 March 2023
Audio Streaming
Audio recordings of the meeting (including the attendance or contribution of any
party participating or making a contribution) will be published on the Council’s
website and the Council’s host’s webcast/audio stream platform.
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site.
Page 2

Page 3

WEST DUNBARTONSHIRE COUNCIL
WEDNESDAY, 29 MARCH 2023
AGENDA
1 STATEMENT BY CHAIR – AUDIO STREAMING
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on the agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Council is asked to agree that all votes taken during the meeting will be
done by roll call vote to ensure an accurate record.
5 MINUTES OF PREVIOUS MEETINGS
Submit, for approval as correct records, the undernoted Minutes of Meetings
of West Dunbartonshire Council:-
(a) Ordinary meeting – 21 December 2022; and 11 – 27
(b) Budget meeting – 1 March 2023 29 – 64
6 MINUTES OF MEETING OF AUDIT COMMITTEE 65 – 68
Submit for information, and where necessary ratification, the Minutes of
Meeting of the Audit Committee held on 9 November 2022.
7 OPEN FORUM
The following Open Forum questions have been submitted:-
(a) Question from Jay Haston
To ask the leader of the Council, following the decision that was unanimously
taken by the Council at the August 26th 2021 meeting in respect of the WAVE
Trust, can the leader of the Council provide an update into what work has
subsequently been undertaken to progress this?
Page 3

Page 4

(b) Question from Susan Dick
I currently own land which will be bulldozed as part of the exxon development. 
I have one request in light of this Councils drive towards net zero and any 
climate change policies they may have. 
Within this field there is large and beautiful 200 year old tree. It is on a
prominent site within the field near the private road also belonging to myself
and which is a right of way, it is a healthy tree which grows straight with no
known issues or health concerns. 
There is also a large wildlife pond near the Arnold Clark end of the site. 
I don’t think either of them are in the path of the intended roads. 
When the site is cleared I ask that serious attempts are made to save this tree
and the pond from destruction. I ask this due to the tree’s great age and the
fact that a tree of this age and size will be an asset in carbon capturing,
something that should be important to us all. The pond will also be doing its
bit for wildlife in the area and carbon capture as well. 
It is not good enough to simply destroy such a valuable tree and replace it
with tiny saplings as is the norm.   
The hundreds of trees that will be lost on this site mean that the drive towards
net zero will be damaged extensively but the saving of this tree and pond
could help offset some of the damage done to the environment when this field
is destroyed. 
Could I have any kind of assurances that when decisions are being made the
saving of the tree and pond could be considered as essential. 
To be truthful after all that has gone on over my field it is the very least you
can do. 
8 CONTINGENCY ARRANGEMENTS (NUCLEAR INCIDENT)  – 69 – 75  
MOTION FROM COUNCIL 21 DECEMBER 2022     
Submit report by the Chief Officer – People and Technology providing an
update on the local resilience structures should there be a nuclear incident at
Faslane. 
9 GLASGOW CITY REGION CITY DEAL – UPDATE   77 – 81 
Submit report by the Chief Officer – Regulatory and Regeneration noting the
progress with the implementation of the Glasgow City Region City Deal. 
10/ 
Page 4

Page 5

10 NON-DOMESTIC RATES EMPTY PROPERTY RELIEF POLICY 83 – 94 
Submit report by the Chief Officer – Resources seeking approval of the
introduction of West Dunbartonshire Council’s locally agreed Non-Domestic
Rates (NDR) Empty Property Relief (EPR). 
11 SCALE OF CHARGES – CLYDEBANK TOWN HALL –  95 – 99 
MOTION FROM COUNCIL 31 AUGUST 2022 
Submit report by the Chief Officer – Citizen, Culture & Facilities requesting
consideration of a review of all hire costs associated with Clydebank Town
Hall events and what level of charitable discount or reduction is appropriate. 
12 TREASURY MANAGEMENT STRATEGY AND ANNUAL   101 – 133 
INVESTMENT STRATEGY         
Submit report by the Chief Officer – Resources seeking Council approval of
the proposed Treasury Management Strategy Statement and Annual
Investment Strategy and the indicators contained within. 
13 GENERAL SERVICES BUDGETARY CONTROL REPORT TO 135 – 212 
31 JANUARY 2023 (PERIOD 10) 
Submit report by the Chief Officer – Resources providing an update on the
General Services revenue budget and the approved capital programme to 31
January 2023. 
14 HOUSING REVENUE ACCOUNT BUDGETARY CONTROL  213 – 233 
REPORT TO 31 JANUARY 2023 (PERIOD 10)   
Submit report by Chief Officer – Resources providing an update on the
financial performance to 31 January 2023 (Period 10) of the HRA revenue
and capital budgets for 2022/23. 
15 NOTICE OF MOTIONS 
(a) Motion by Councillor Jim Bollan – Naloxone Intervention Kits
Council recognises the huge number of deaths due to opiate overdose in
Scotland.  West Dunbartonshire, at the end of 2022, had six such deaths
within the space of a month. 
People who overdose on opiates can be saved by Naloxone being
administered, which temporarily reverses the effects of opiate overdose to
allow medical intervention. 
Page 5

Page 6

Last year in Scotland 1,300 lives were saved by Naloxone.
Council agrees to locate a Naloxone Intervention Kit in all Council premises,
Offices, Libraries, Leisure Centres, Residential Units and other locations,
where it is felt they could be of emergency assistance. 
Free training for staff locally (45mins) is available, the Naloxone Kit and a free
supply of the Naloxone is available locally from the NHS for all
accredited/trained users. 
(b) Motion by Councillor Clare Steel – Scottish Water Inadequate 
Infrastructure and Local Flooding in Linnvale   
This Council is concerned about the annual flooding events which affect
Linnvale in Clydebank. 
The Council notes that an Open Forum Question from John Mooney was
considered at the December Council and that Councillor David McBride
responded on behalf of West Dunbartonshire Council. A copy of the question
and response is appended to this motion. 
The access to Linnvale is limited and the only way in and out of the area by
vehicle is through Livingston Street which is highly prone to localised
flooding.   As a result, when we have heavy rain, the road into Linnvale
becomes unusable and means that local residents, emergency services and
businesses are affected. 
As well as the temporary isolation this causes, there is an inherent risk of
flooding to homes which is a major concern for local residents. 
Council is concerned that although the flooding is captured in the Clyde &
Loch Lomond Local Flood Risk Management Plan, funding for the Scottish
works to bring its infrastructure up to an adequate standard has not yet been
identified.   
The Council has made commitment to support Tenants & residents with flood
preventions to their property.  Council has also committed to working with
Scottish Water to accelerate key areas that experience flooding due to
capacity issues in the Scottish water draining system. Funding has been
allocated by West Dunbartonshire Council to progress those studies. 
Given the above, the Council asks the Chief Executive to write to the
appropriate Cabinet Secretary highlighting the impact of the flooding on the
residents of Linnvale and calls on the Scottish Government and Scottish
Water to prioritise the replacement of the inadequate Scottish Water
infrastructure. 
Page 6

Page 7

Appendix 
Open Forum Question John Mooney:
The following Open Forum question has been submitted:- Question from John
Mooney – Flooding in Linnvale, Clydebank 
The Linnvale community is very concerned about the recurrent flooding of
their streets. It is disappointing and demoralising to read the recriminations
between the Council and Scottish Water about this in the local press. 
Can the Council provide an assurance today that it will do its utmost to work in
partnership with Scottish Water and the Linnvale community to sort this out for
good? 
Council Response by Councillor David McBride: 
The Clyde & Loch Lomond Local Flood Risk Management Plan sets out the
actions that West Dunbartonshire Council has agreed to take forward to
reduce the overall flood risk within the area. 
These actions have been discussed and agreed by the WDC, SEPA, Scottish
Water and all other responsible authorities & Public bodies involved in
reducing Flood Risk. 
West Dunbartonshire Council will be the Lead on the action for a Surface
Water Management Plan for the Clydebank Area, this is a cycle 3 action
under the Clyde & Loch Lomond Local Flood Risk Management Plan for West
Dunbartonshire Council & Scottish Water due to the ongoing actions. 
At this time there is no confirmation of when the funding will be made
available from the Scottish Government to fund this piece of work as the
flooding budget is currently oversubscribed. 
The flood study has identified a number of locations at high risk to the impact
of surface water and the need for a detailed Surface Water Management plan
to be developed to address current capacity issue of the existing drainage
system. 
Whilst the responsibility for surface water lies with the local authority, the
majority of drainage systems are owned and maintained by Scottish Water
and as such any plans need to be developed in conjunction with them. 
Although the Council will be looking at methods to best manage the Surface
Water within the area, there will still be a Flood Risk from the combined sewer
systems where the capacity is not sufficient. 
Page 7

Page 8

Scottish Water have confirmed that there is a capacity issue within the
existing systems at Linnvale which results in flooding experienced at street
level. 
A budget allocation of £500k was made in the 2022/23 budget to accelerate
flood prevention works. 
The 2nd Nov 2022 IRED Committee approved that £375k would be allocated
to accelerate feasibility studies for a number of priority locations that are
identified within the Surface Water Management Study. Linnvale has been
identified as a priority location. 
As part of this investment the Council will liaise with Scottish Water to
undertake a focused study to develop plans for water alleviation and system
upgrades to reduce the impact of surface water within the area. 
(c) Motion by Councillor Craig Edward – Additional Dwelling Supplement 
Tax Increase  
Council notes the Scottish Budget announced on the 15th of December 2022,
resulted in the Additional Dwelling Supplement (ADS) increased from 4% to
6% with immediate effect. This tax is payable on the total price of purchasing
additional residential properties in Scotland, when a property purchase price
exceeds £40,000. 
Local Authorities are still obliged to pay the ADS rate. To put this into context,
if the Housing Department purchased an ‘off the shelf’ buy back property on
the open market at £100,000, then the Housing Revenue Account (HRA)
would be paying an additional £2000 in ADS. 
Housing policy must not solely rely on building new homes, when it is possible
to purchase private housing to meet the needs of our citizens on the housing
waiting list. Each property purchased becomes council housing stock. 
This Council has ambitious plans to purchase more homes for council
ownership. Based on our 2023/24 projections, the HRA would be paying
£300,000 in ADS, which is £100,000 more than was the case prior to the
Scottish Government increasing this tax at the Scottish Budget
announcement. 
This will have a real impact on Council’s plans because if it did purchase a
home at £100,000 for example, the unjustness of the ADS tax will result in
either council tenants suffering with a £300,000 surcharge, or council
purchasing three less properties each year. 
This is not an acceptable situation for our tenants or for our citizens on
housing waiting lists. 
Council commends the hard work and diligence of our housing staff who have
already been lobbying strongly and repeatedly for this obstructive tax increase
Page 8

Page 9

to be reversed, to enable more homes to be purchased for council housing
use.
Council supports the work of our staff highlighting this tax injustice. Therefore,
the Convenor of Housing, Employability & Communities, and the Leader of
the Council, will make respective representations to the relevant Cabinet
Secretaries, and via COSLA. The representation will highlight the absurdity of
this situation, call for this tax increase to be reversed immediately, and
highlight the negative impact the ADS increase has on the Scottish
Government’s own priorities in terms of increasing supply and housing by
2040.
Council will also liaise directly with the WDTRO on raising these concerns and
report back to council on the outcome of the representations made, as above.
(d) Motion by Councillor Sophie Traynor – Growing Up Grieving
Council recognises the differing levels of bereavement services for children
and young people within schools across West Dunbartonshire.
The current support that is in place varies significantly across schools in the
area and is not holistic enough to fully support grieving children and young
people throughout their school careers. The motion is based on the National
Childhood Bereavement Project's “Growing Up Grieving” report which was
delivered by Includem which looks at this issue on a national level.
Council requests the Chief Education Officer to address the lack of
universality of bereavement support provided in schools across West
Dunbartonshire through a bereavement policy that takes at a whole school
approach to death, dying and bereavement to support all children and young
people who are experiencing grief.
(e) Motion by Councillor Craig Edward – Welcoming HM Coastguard to
Clydebank
Council warmly welcomes news that His Majesty’s Coastguard will soon be
creating a new Coastguard Rescue Team based in Clydebank.
Coastguard Rescue Teams (CRTs) are made up of fully trained volunteers
from all walks of life that will attend emergencies on the Clyde and can be
mobilised to support partner agencies inland with any qualifying incident.
This is fantastic news for all of West Dunbartonshire and beyond.  CRT’s
expertise ranging from persons in water incidents, flooding incidents, trapped
persons, concern for persons, missing persons, vessels in distress, and
helicopter operations to name but a few.
Council looks forward to working constructively with HM Coastguard.
Page 9

Page 10

(f) Motion by Councillor Craig Edward – Clyde Green Freeport Bid
Disappointment
Council is deeply disappointed that the Clyde Green Freeport bid has lost out
in the race to win freeport status.  This is a major investment opportunity
which has been awarded concentrating out-with the Clyde estuary, with the
Cromarty Firth and Firth of Forth benefitting from freeport status instead.
The special economic zone would have resulted in tens of thousands of new
jobs across the Clyde and beyond, benefiting citizens of West Dunbartonshire
with new opportunities.
This decision bypasses the beating heart of Scotland’s economy, and
importantly the communities at greatest need to benefit from the Levelling Up
agenda.
Both UK and Scottish Governments need to address the further disadvantage
this decision creates affecting the Glasgow City Region including West
Dunbartonshire, which has a proud and proven track record in delivering
projects with real economic, infrastructure, social, and regeneration outcomes.
The Leader of the Council will write to both governments outlining Council’s
disappointment, particularly as it has been revealed that this application
scored higher in the bid submission criteria than all but one of the other
bids.  The Leader will also request further opportunities for both governments
to work with Council and attract investment and job opportunities for West
Dunbartonshire.
Page 10

Page 11

WEST DUNBARTONSHIRE COUNCIL
At a Hybrid Meeting of West Dunbartonshire Council held in the Civic Space, 16
Church Street, Dumbarton on Wednesday, 21 December 2022 at 4.02 p.m.
Present: Provost Douglas McAllister and Councillors Jim Bollan, Karen
Conaghan, Ian Dickson, Craig Edward*, Gurpreet Singh Johal,
Daniel Lennie, David McBride, Jonathan McColl, James
McElhill, Michelle McGinty, June McKay, John Millar, Lawrence
O’Neill, Lauren Oxley, Chris Pollock, Martin Rooney, Gordon
Scanlan, Hazel Sorrell, Clare Steel and Sophie Traynor.
* arrived later in the meeting
Attending: Peter Hessett, Chief Executive; Alan Douglas, Chief Officer –
Regulatory and Regeneration (Legal Officer); Laurence Slavin,
Chief Officer – Resources and Section 95 Officer; Peter Barry,
Chief Officer – Housing and Employability; Beth Culshaw, Chief
Officer – West Dunbartonshire Health and Social Care
Partnership, Amanda Graham, Chief Officer – Citizen, Culture
and Facilities; Gail Macfarlane, Chief Officer – Roads and
Neighbourhood; Laura Mason, Chief Education Officer; Victoria
Rogers, Chief Officer – People and Technology; Angela Wilson,
Chief Officer – Supply, Distribution and Property; Michelle Lynn,
Assets Co-ordinator; George Hawthorn, Manager – Democratic
and Registration Services and Christine McCaffary, Senior
Democratic Services Officer.
Also Attending: Christopher Gardner, Senior Audit Manager, Audit Scotland.
Apologies: An apology for absence was intimated on behalf of Councillor
Diane Docherty.
Provost Douglas McAllister in the Chair
STATEMENT BY CHAIR
Provost McAllister advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback.
ITEM 5 (a)
Page 11

Page 12

MINUTE OF SILENCE
At the request of the Provost, the Council observed a minute’s silence as a mark of
respect following the recent passing of Richard Polanski, who was the last surviving
crew member of the Polish Navy warship, ORP Piorun, that while docked in
Clydebank during World War II had helped defend the town.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda at this point in the meeting.
RECORDING OF VOTES
The Council agreed that all votes taken during the meeting would be done by roll call
vote to ensure an accurate record.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of West Dunbartonshire Council held on 26 October 2022
were submitted and approved as a correct record.
MINUTES OF AUDIT COMMITTEE
The Minutes of Meeting of the Audit Committee held on 10 August 2022 were
submitted and approved as a correct record.
OPEN FORUM
The Provost advised that the undernoted Open Forum question had been received
from Mr John Mooney.  He then invited Mr Mooney to put his question to Council.
Question from John Mooney – Flooding in Linnvale, Clydebank
The Linnvale community is very concerned about the recurrent flooding of
their streets. It is disappointing and demoralising to read the recriminations
between the Council and Scottish Water about this in the local press. 
Can the Council provide an assurance today that it will do its utmost to work in
partnership with Scottish Water and the Linnvale community to sort this out for
good?
Page 12

Page 13

Councillor McBride provided the following response:-
The Clyde & Loch Lomond Local Flood Risk Management Plan sets out the
actions that West Dunbartonshire Council has agreed to take forward to
reduce the overall flood risk within the area.
These actions have been discussed and agreed by the WDC, SEPA, Scottish
Water and all other responsible authorities and public bodies involved in
reducing Flood Risk. 
West Dunbartonshire Council will be the lead on the action for a Surface
Water Management Plan for the Clydebank Area, this is a cycle 3 action
under the Clyde & Loch Lomond Local Flood Risk Management Plan for West
Dunbartonshire Council and Scottish Water due to the ongoing actions. 
At this time, there is no confirmation of when the funding will be made
available from the Scottish Government to fund this piece of work as the
flooding budget is currently oversubscribed.
The flood study has identified a number of locations at high risk to the impact
of surface water and the need for a detailed Surface Water Management plan
to be developed to address current capacity issue of the existing drainage
system.
Whilst the responsibility for surface water lies with the local authority, the
majority of drainage systems are owned and maintained by Scottish Water
and as such any plans need to be developed in conjunction with them.
Although the Council will be looking at methods to best manage the Surface
Water within the area, there will still be a Flood Risk from the combined sewer
systems where the capacity is not sufficient.
Scottish Water have confirmed that there is a capacity issue within the
existing systems at Linnvale which results in flooding experienced at street
level. 
A budget allocation of £500k was made in the 2022/23 budget to accelerate
flood prevention works.
The 2nd November 2022 IRED Committee approved that £375k would be
allocated to accelerate feasibility studies for a number of priority locations that
are identified within the Surface Water Management Study.  Linnvale has
been identified as a priority location.
As part of this investment the Council will liaise with Scottish Water to
undertake a focused study to develop plans for water alleviation and system
upgrades to reduce the impact of surface water within the area.
Page 13

Page 14

Mr Mooney asked the following supplementary question:-
Can residents in the area be provided with information on the process of gully
cleaning, e.g. timescales and the priority areas?
Councillor McBride advised that he would ask officers to issue this information in due
course.
GLASGOW CITY REGION CITY DEAL – UPDATE
A report was submitted by the Chief Officer – Regulatory and Regeneration noting
the progress with the implementation of the Glasgow City Region, City Deal.
Having heard the Chief Officer in answer to Members’ questions, the Council agreed
to note the progress of the Glasgow City Region programme.
REVIEW OF THE COUNCIL’S CAPITAL PROGRAMME
A report was submitted by the Chief Officer – Resources providing the Council with
the outcome of a review of the Council’s Capital Programme and presenting
recommendations to reduce the capital programme in light of concerns about
affordability.
Note:  Councillor Edward joined the meeting at this point.
Councillor McBride, seconded by Councillor O’Neill moved:-
This Council agrees the recommendations in the report subject to the
following changes:
 Supply Distribution & Property (SDP): New Sports Facility Dumbarton West
(Old OLSP): To retain this planned spend within the current capital
programme on the basis that it was a long term commitment to the local
community following the relocation of the Secondary School.
 Supply Distribution & Property (SDP): New Westbridgend Community Centre:
To ask officers to re-profile the spend and build programme over 2023/24 and
2024/25 to allow for a decision to be made on whether the group has been
successful in its bid for Regeneration Capital Grant Fund (RCGF) which will
not be known until September 2023.
As an amendment, Councillor Dickson seconded by Councillor Conaghan moved:-
Council agrees the recommendations at 2.1 of the report with the following
exceptions/caveats:
Page 14

Page 15

 P41, SDP New Sports Changing Facility Dumbarton West (Old OLSP)
o No decision is taken on this until user groups and the local
community are consulted. Feedback from this consultation can be
fed back to the budget meeting next year with a final decision taken
then.
 P41, New Westbridgend Community Centre
o This will remain in the capital plan until the outcome of the RCGF
bid is known. Council can make a decision on a way forward during
the 2024/25 budget process.
 P41, Changing Places Toilet Provision
o While removing the current provision from the capital plan, Council
commits to providing these facilities within the Dumbarton Concord
Centre and Alexandria Community Centre as part of the planned
refurbishments as suggested in the report.
 P42, Footways/Cycle Path Upgrades ¦ Footway Resurfacing (RAMP) ¦
P 43, Roads Improvements ¦ Pavement Improvements ¦ P46,
Infrastructure – Roads
o There will be no removal or reduction of these capital budgets,
which are a priority for our constituents and do not result in a
significant revenue saving in the context of the projected budget
gap; Council does not believe the 2023/24 cost saving benefit
(£98k) outweighs the detriment of making this cut.
 P45, A813 Road Improvement Phase 1
o Council agrees that this project should remain in the capital
programme for 2025/26. There is no revenue benefit to the
2023/24, 2024/25 or 2025/26 budgets according to the officer’s
report. This is however an important planned upgrade to a piece of
infrastructure needing investment.
 P45, Audio Visual Equipment
o Any proposals to reduce capital funding must not have an adverse
impact on teachers’ ability to provide a good learning experience
for our children and young people.
 P53, Children and Families Team (Dumbarton/Vale of Leven)
o Council agrees that funding WILL be available to deliver these
premises as promised by Council. We cannot and will not renege
on this commitment to our hard working Children and Families
Social Work team and the families they support.
On a roll call vote being taken 8 members voted for the amendment, namely
Councillors Conaghan, Dickson, McColl, McElhill, Oxley, Pollock, Scanlan and
Traynor, 11 members voted for the motion, namely Provost McAllister and
Councillors Johal, Lennie, McBride, McGinty, McKay, Millar, O’Neill, Rooney, Sorrell
and Steel.  Two members abstained from voting, namely Councillors Bollan and
Edward.  The motion was declared carried.
Page 15

Page 16

FINANCIAL UPDATE
A report was submitted by the Chief Officer – Resources providing an update on the
financial challenges facing the Council, the estimated 2023/24 – 2024/25 revenue
budget gaps and presenting the first tranche of saving options for Members
consideration to help the Council deliver a balanced 2023/24 budget.
The Chief Officer provided a further verbal update and officers were heard in answer
to Members questions.
Councillor Rooney, seconded by Councillor McGinty moved:-
Council thanks the Chief Officer of Resources for the detailed Financial
Update in the report and for the verbal update following the Scottish
Government setting out its budget proposals on 15th December.  
This is without doubt the greatest financial challenge in the history of West
Dunbartonshire Council. We have increasing cost pressures, limited funding
support from government and we were left with the additional financial burden
as a result of the previous administrations failure to tackle the financial risks.  
Council notes that the Scottish Government Block Grant increased by £3.9
Billion for 2022/23. However, the Scottish Government chose to give councils
a “flat cash” settlement which was a real terms cut of £100m. 
At the same time the Scottish Government indicated they would cut funding to
Councils by a further 7% over four years. (1.75% average cut per year).    
As a result of underfunding and cost pressures, the West Dunbartonshire
Council budget gap has grown to a massive £21m by December:
 We were left with a £13.8m Gap Council following the SNP Councils
budget in March.
 By the summer it reached £18.3m due to a range of cost pressures.
 By December the gap increased to £21m.
Unfortunately, as had been set out by the Chief Officer for Resources the
early indications are that the reality of the 2023/24 Scottish Government
budget is another “flat cash” settlement which, in a financial climate where
inflation exceeds 10%, is a real terms cut in funding which will affect services
and jobs. 
This is the Scottish Government forcing yet more austerity upon West
Dunbartonshire Council. 
Given the above, the Council agrees the following:
a) To reconfirm the October Council decision to the 72/28 split of residential
care costs as per 2.1 serial of the report and agree to transfer a
proportionate share of the 2022/23 budget.
Page 16

Page 17

b) To retain the full £4.748 million of Scottish Government funding provided
as a contribution to the 2022/23 pay award to focus on Council priorities. 
c) To note the estimated revenue budget gap from £14.309 million to
£21.142 million. 
d) To approve the activation of the Service Concessionary Financial
Flexibility to cover the life of the assets rather than the life of the contracts. 
e) To approve the earmarking of the one off benefit generated by the Service
Concessionary Financial Flexibility: 
 To establish a £15m voluntary redundancy / early retirement reserve.
 To establish a £6m smoothing fund to support a three year service
transformation programme. 
 To provide £1.75m to increase the Councils prudential target to 3% of
expenditure (net of requisitions).
 To fund the Councils projected 2022/23 overspend of £1.5m.
 To provide £4.39m of funding for the impact of the 2022/23 pay award
on 2022/23 and 2023/24. 
f) To approve £3.019m of the 2023/24, rising to £4.042m in 2024/25, saving
options outlined at Appendix 1 with the following adjustments/clarification:   
Adjustment/ Clarification 2023/24
£000
2024/25
£000
Proposed Savings
per Appendix 1 
3,193 4,238
RN02 – Reduced
Civic Waste
Amenity Site
Option supported is to retain two
sites but with reduced opening
hours and with a one day per
closure at each site which retains a
7 day service across the Council
area. This saves £63,000 in
2023/34 rising to £113,000 in 24/25
rather than £140,000 in 2023/24
and future years
(77) (27)
RR13 - Close
Clydebank
Registration Office
and provide
necessary services
from Dumbarton
Reject this option to remove
registration services from
Clydebank.  Removes saving of
£28,000 per annum
(28) (28)
EDU01 – Close out
of school care
services at
Linnvale and St
Eunan’s Primary
Schools
Reject this option.  Removes saving
of 25,000 in 2023/24 rising to
£38,000 in future years
(25) (38)
Page 17

Page 18

CCF07 – Review
funding for events
programmes 
It should be noted that although the
saving is agreed, the intention
remains to secure external funding
to support local events.
0 0
EDU08  - Reduce
School Transport
Provision
Reduce School Transport towards
statutory limits taking account of
safe routes to school and increasing
free bus pass update and work with
bus companies to increase
provision at busy times.
0 0
RES06 – Review of
the Capital
Programme
Adjust the revenue savings to be
generated by the review of the
capital programme to reflect the
decisions taken by Council in
relation to Agenda Item 9 to this
Council meeting.
(44) (103)
Approved Savings 3,019 4,042
g) To note the £899,000 of management adjustments at Appendix 2 which
will contribute towards a balanced budget and future projected budget
gaps.
h) To approve the rescheduling of the budget setting meeting from 8th
February to 1st March.
i) Approve the use of the one off benefit associated with the Service
Concessionary Financial Flexibility as a recovery plan to restore the
council’s reserves to be in line with or above the Councils prudential
target.
These actions will help generate funds to help towards reducing the council
budget gap. However, the bulk of the savings will be considered at a future
budget setting meeting on 1st March 2023. 
This Council has given a public commitment to assist local residents with the
Cost of Living Crisis. Therefore, Council agrees to earmark £1 million to provide
a further £250,000 of cost of living support each year for the next four years. 
This is to be funded from the Council’s general reserves including the transfer
of the balance of £0.99m from the Service Concessionary One Off benefit. 
As an amendment, Councillor Dickson seconded by Councillor Conaghan moved:-
Council agrees the recommendations at 2.1 of the report with the following
exceptions/caveats:
b) Council does not have enough information at this time to determine
whether it would be appropriate for a proportion of the £4.748m of
Scottish Government funding provided as a contribution to the 2022/23
pay award to be passed through to the Health and Social Care
Page 18

Page 19

Partnership (HSCP). Council is aware that the HSCP may be in a position
to fund this pressure from reserves, which may be a better option given
the extreme pressure on Council budgets. Officers should provide
narrative and options around this to allow members to make an informed
decision at the March 2023 budget meeting.
e) Council does not agree that it is appropriate to increase the prudential
reserve at a time when we must maximise spending on public services,
therefor the £1.75m referred to will transfer to the general reserve for
elected members to decide how best to make use of this money as part of
the March 2023 budget meeting.
f) Council does not agree any of the proposed saving options at this time
and instead agrees that as the last public consultation feedback has
expired, a new consultation be carried out during January & February on
all savings options, or as was done previously, on public priorities for
spending by service area, to allow elected members to deliver on the
needs and wishes of the citizens we were elected to serve.
i) Approve the use of the one off benefit associated with the Service
Concessionary Financial Flexibility as a recovery plan to restore the
Council’s reserves to be in line with, or above, the Council’s prudential
target of 2%.
On a roll call vote being taken 8 members voted for the amendment, namely
Councillors Conaghan, Dickson, McColl, McElhill, Oxley, Pollock, Scanlan and
Traynor and 12 Members voted for the motion, namely Provost McAllister and
Councillors Edward, Johal, Lennie, McBride, McGinty, McKay, Millar, O’Neill,
Rooney, Sorrell and Steel.  One member abstained from voting, namely Councillor
Bollan.  The motion was declared carried.
Councillor Bollan, having failed to find a seconder for a proposed second
amendment asked for his dissent to be recorded in respect of this item.
GENERAL SERVICES BUDGETARY CONTROL REPORT TO 31 OCTOBER 2022
(PERIOD 7)
A report was submitted by the Chief Officer – Resources providing an update on the
General Services revenue budget and the approved capital programme to 31
October 2022.
The Council agreed:-
(1) to note a current projected annual adverse variance on the revenue account
of £1.447m (0.56% of total budget); and
(2) to note that projected expenditure on the capital account was lower than the
2022/23 budget by £23.294m (34.18% of budget), made up of £22.073m
Page 19

Page 20

(32.39% of budget) of project re-profiling, and an in-year net underspend of
£1.221m (1.79% of budget). 
HOUSING REVENUE ACCOUNT (HRA) BUDGETARY CONTROL REPORT TO 31
OCTOBER 2022 (PERIOD 7) 
A report was submitted by the Chief Officer – Resources providing an update on the
financial performance to 31 October 2022 (Period 7) of the HRA revenue and capital
budgets for 2022/23. 
Having heard officers in answer to Members’ questions, the Council agreed:- 
(1) to note that the revenue analysis showed projected adverse variances of
£1.298m however this would be offset by reducing the contribution from
revenue to capital (CFCR) therefore netting to a revenue break even position;
and 
(2) to note that the net projected annual position in relation to the capital plan was
highlighting an in-year adverse variance of £26.444m (40.31%) which was
made up of re-profiling of £28.346m (43.21%) and overspend of £1.902m
(2.9%) as detailed in Appendix 4 to the report. 
AUDITED FINANCIAL STATEMENTS 2021/22 
A report was submitted by the Chief Officer – Resources providing Members with the
opportunity to scrutinise the Audited Annual Accounts 2021/22 for both the Council
and the Charities administered by the Council, following approval at the Audit
Committee on 9 November 2022. 
The Council agreed:- 
(1) to note the information provided within the Audited Annual Accounts
2021/2022 – covering the Council and the Charities administered by the
Council and as appended to the report; and 
(2) to note that the Statements were approved by the Audit Committee on 9
November 2022. 
ANNUAL AUDIT REPORT TO MEMBERS AND CONTROLLER OF AUDIT 2021/22 
A report was submitted by the Chief Officer – Resources providing Members with the
opportunity to consider the Annual Audit Report to Members and Controller of Audit
for the Council and the Trusts administered by the Council, following consideration
by the Audit Committee on 9 November 2022. 
Page 20

Page 21

The Council agreed:-
(1) to note the information provided within the letter to the Audit Committee in
relation to DR AK Glen and West Dunbartonshire Trust Fund - as appended
to the report;
(2) to note the Annual Audit Report to Members and Controller of Audit 2021/22
for the Council and the Charities administered by the Council - as appended
to the report; and
(3) to note that the Letter and the Annual Audit Report, together with the Financial
Statements were reported to the Audit Committee on 9 November 2022.
COMMITTEE TIMETABLE – AUGUST 2023 TO APRIL 2027
A report was submitted by the Chief Officer – Regulatory and Regeneration
proposing a timetable of Council and committee meetings for the period August 2023
to April 2027.
The Council agreed:-
(1) to approve the timetable of meetings for the period August 2023 to April 2027
shown as an appendix to the report;
(2) that meetings of the Council and the four policy committees (Corporate
Services, Educational Services, Housing and Communities and Infrastructure,
Regeneration and Economic Development) continue to be held in hybrid
format in the Civic Space, Council Offices, Church Street, Dumbarton;
(3) that meetings of regulatory committees, namely Planning and Licensing,
continue to alternate between the Council Offices, Church Street, Dumbarton
and Clydebank Town Hall;
(4) that Appeals Committee meetings continue to be held in the Council Offices,
Church Street, Dumbarton to ensure a sufficient number of rooms are
available for the parties involved;
(5) that meetings of the Audit Committee alternate between Dumbarton and
Clydebank; and
(6) that meetings of the remaining committees continue to be held in the Council
Chamber, Clydebank Town Hall.
EQUALITIES REVIEW OF TERMS AND CONDITIONS OF EMPLOYMENT
A report was submitted by the Chief Officer – People and Technology seeking
approval of proposed changes to terms and conditions of employment for local
government and craft employees to further eradicate inequalities and to authorise
Page 21

Page 22

the Chief Officer – People and Technology to engage with the Trade Unions for
consultation with a view to seeking agreement on their implementation.
Councillor Rooney, seconded by Councillor McGinty moved:-
That the Council agrees the following proposals:-
 Align the core terms and conditions of employment for local government
and all craft employees to further equality of offering.
 To replace current overtime enhanced rates, with a single overtime rate of
time plus a quarter for any hours in excess of 37 per week, payable to
grades 1 to 7.
 A review of contracts of employment across relevant service areas to
remove contractual overtime.
 Replace the additional 4 public holidays for those employed on Craft
Operative terms and conditions (i.e. last Friday and Monday in May, third
Monday in July and last Friday in September), with additional days
transferred to annual leave entitlement.
 Replace 2 public holidays for all employee groups, again transferring these
days to annual leave entitlement.
 Removal or replacement of alternating shift allowance.
 Replace facility for incremental progression after 6 months for eligible
employees, instead applying incremental progression annually on 1st April
in line with existing employees.
 Remove the historical, now closed discretionary Group Life Assurance
Scheme provision entirely.
 Introduce a provision whereby employees appointed to standalone
business critical roles of below grade 8 will be contractually required to give
a minimum of 8 weeks’ notice of their intention to terminate employment.
As an amendment, Councillor McColl seconded by Councillor Conaghan moved:-
During the previous 5 year term, the then SNP Administration consistently
opposed and rejected proposals brought forward by management to reduce
staff terms and conditions for the purpose of making budget savings.
Any proposals to change terms and conditions will go through an appropriate
consultation and negotiation process with the trades unions, BEFORE being
debated by Council transparently, with uncensored feedback from trades
unions provided as an appendix to any officer report.
On a roll call vote being taken, 9 Members voted for the amendment namely
Councillors Bollan, Conaghan, Dickson, McColl, McElhill, Oxley, Pollock, Scanlan
and Traynor and 12 Members voted for the motion, namely Provost McAllister and
Councillors Edward, Johal, Lennie, McBride, McGinty, McKay, Millar, O’Neill,
Rooney, Sorrell and Steel.  The motion was declared carried.
Page 22

Page 23

NOTICE OF MOTIONS 
(a) Motion by Councillor Jim Bollan - STUC Campaign “Scotland Demands
Better” 
Councillor Bollan moved:- 
Council agrees to support the STUC's campaign "Scotland Demands Better".
The key points of which are noted below, which sets out a programme to help
combat the effects of the Cost of Living Emergency. 
1. A real pay rise for all public service workers
2. A social security system that loosens the grip of poverty
3. Warm homes, through municipal energy companies
4. Sustained action to tackle rent costs
5. Share the wealth, through income, wealth and business taxes
6. Universal free school meals
7. Cheap, publicly controlled public transport
8. More support for childcare
9. Enforcement of Fair Work 
Council further agrees to circulate the motion to all other Scottish Councils
seeking their support for the motion. 
The motion was agreed by the Council. 
(b) Motion by Councillor Jim Bollan – Contingency Plans in the Event of
Nuclear Incident at Faslane 
Councillor Bollan moved:- 
Council will be aware of the recent reports of the serious fire on the Vanguard
Nuclear Submarine which was carrying Trident missiles, while it was in the
North Atlantic. 
The fire was tackled by the crew, then the submarine had to surface to expel
toxic fumes. The incident brings into sharp focus the absolute catastrophe that
could have unfolded had the submarine been lost in the North Atlantic. 
This dangerous incident will be of great concern to many local people given
the location of the incident and that the submarine is being taken back to
Faslane Base. Given the gravity of the situation Council asks the CEO to
bring a report to the next Council meeting detailing what contingency plans
the Council has in the event of a serious nuclear incident at Faslane, or the
surrounding waters, to support and protect the residents of West
Dunbartonshire. 
The motion was agreed by the Council. 
Page 23

Page 24

(c) Motion by Councillor Clare Steel – Kilbowie St Andrew’s Church,
Clydebank
Councillor Steel moved:-
This Council recognises the important part that Kilbowie St Andrew’s Church
has played in the history of Clydebank and that local residents have a strong
association with the church. 
This church has been a key focus of help and support over many decades
and a key element of the Council and the community of Clydebank for
commemorating the Clydebank Blitz.
The church building endured the Clydebank Blitz and contains important
artefacts such as the Blitz Chapel, a memorial stained glass window and a
book was created with the names of all those who lost their lives in the Blitz.
The church was also gifted a valuable triptych painting portraying images of
the Blitz created by renowned local artist Tom McKendrick.  In addition, it is
regarded as a Chapel of Remembrance and Reflection in Clydebank.
Given the above, this Council calls on the Clyde Presbytery to reconsider its
plans to close Kilbowie St Andrew’s Church and instead to retain the church
and preserve its historic story for the benefit of future generations.
The motion was agreed by the Council.
(d) Motion by Councillor Gurpreet Singh Johal – Prioritising Repairs Related
to Dampness and Mould
Councillor Johal moved:-
West Dunbartonshire Council notes the tragic death of two year old Awaab
Ishak who passed away in December 2020 in Rochdale, having suffered
prolonged exposure to mould as concluded by the coroner on Tuesday, 15
November 2022.
This avoidable death should be a wake-up call for all social housing providers
including West Dunbartonshire Council, and local, regional and national
Housing Associations. Council therefore asks the Chief Officer of Supply,
Distribution and  Property and Chief Officer, Housing and Communities to:
1. Review our approach to dampness in Council properties and how best to
prioritise associated repairs.
2. Introduce a process to ensure all dampness/mould repairs are checked
and signed off by Maintenance Co-ordinator before the case is closed.
This quality control check should ensure the action taken has fully
resolved the complaint.
Page 24

Page 25

3. Produce a briefing note setting out the outcome of the review to be sent to
all elected members for information.
Council further notes that we will take all appropriate actions to address any
concerns tenants may have. 
Our thoughts and prayers remain with the loved ones of Awaab Ishak
following this heart-breaking case.
The motion was agreed by the Council.
(e) Motion by Councillor Ian Dickson – People Make West Dunbartonshire
Councillor Dickson moved:-
Council recognises that we are fortunate within our communities to have a
wealth of volunteers who give of their time and talents to enrich the lives of
others.
Bryan Warren from Bonhill is one of many volunteers our area is blessed with.
Council applauds Captain Warren for his fundraising efforts over the years,
especially those for the Erskine charity. To date he has raised over £7000
from donations as he plays his bagpipes locally.
It is not only the Erskine charity that benefits from Bryan’s musical talent but
visitors to our local area who are welcomed by such a friendly and positive
ambassador for this area.
We commend Bryan for his good works and wish him good health and
happiness for the years ahead.
The motion was agreed by the Council.
Having heard Councillor Dickson further, the Provost advised that he would be
delighted to present Captain Warren with a gift from his Civic stock.
(f) Motion by Councillor James McElhill – The Stand, Our Holy Redeemer
Primary School
Councillor McElhill, seconded by Councillor Oxley moved:-
This Council recognises that a degree of powers delegated to officers of the
Council can be and is often conducive to the smooth day to day running of the
Council.
Page 25

Page 26

This Council further thanks officers for their continuing hard work and
dedication in this regard.
This Council does not believe, however, that, going forward, Council Officers
should have delegated authority to close long-standing and firmly established
public facilities without the agreement of this Council and without any
consultation with affected community groups.
It would appear that The Stand facility at Our Holy Redeemer Primary School
in Clydebank has recently been boarded up in preparation of demolition
despite a significant amount of money having been identified for its
refurbishment.
It is also the case that neither the school’s PTA nor the local Community
Council, or any other community group, have been informed of the decision to
demolish let alone being consulted on it.
With the above in mind, this Council agrees that a full report is brought to
Council concerning the status of “The Stand” at Our Holy Redeemer Primary
School and the likely impact of any required change to the scheme of
delegation around determination by officers that property is surplus to
requirements.
Council notes that this Motion is in the interests of openness, transparency,
accountability and local democracy.
As an amendment, Councillor Lennie seconded by Councillor McKay moved:-
Council notes that there was no community demand for use of the Stand for
the past four years. The last time it was used was for a sessional dance class
in 2018/19 and there was only a single request for a let after 6pm in 2019.
The building is a time limited facility and has been used by the school as an
ancillary building but is not required for the core activities of the school.
The building known as “The Stand” was previously located at St Andrew’s
High School, Clydebank in 2005 but with the plans for a new Secondary
School at St. Peter the Apostle, the Stand was moved to the Our Holy
Redeemers site in 2013/14, where it served the local community for many
years.
The Council carried out an assessment of the condition of the building with a
view to extending the life of the asset by the school and the wider community
if required.  Asset Management looked to commence work to the building in
the summer of 2022 but survey works could not be carried out until the
summer recess. 
The survey works identified serious rotting within the timber of the structure
and the estimated cost was around £500,000.  As a result Asset Management
and Corporate Health & Safety and Building Services assessed the building to
see if a reduced scope could allow the continued use of the building.
Page 26

Page 27

Corporate Health & Safety advised that on the basis of the physical inspection
of the interior of the building, that the use of the hall could be permitted but
that the rest of the building such as the kitchen, toilets etc., cannot be used
due to poor condition of timber frame and evidence of “soft” underfoot
conditions in a variety of areas indicating potential collapse of floors. 
This meant that the areas out with the hall would need to be cordoned off to
ensure there were no unauthorised entry to the other parts of the building and
if similar structural damage is found around the main hall then it would be
deemed not fit for use from a Health & Safety perspective. 
The findings were reviewed `by a special Learning Estate Project Board in
August 2022. In light of health & safety issues and the fact it was not
economically viable it was agreed that The Stand would be demolished. 
Given the above, the Council agrees that officers should continue with the
plans to demolish the building. 
On a roll call vote being taken 11 Members voted for the amendment, namely
Provost McAllister and Councillors Johal, Lennie, McBride, McGinty, McKay, Millar,
O’Neill, Rooney, Sorrell and Steel and 9 Members voted for the motion, namely
Councillors Bollan, Conaghan, Dickson, McColl, McElhill, Oxley, Pollock, Scanlan
and Traynor.  One Member abstained from voting, namely Councillor Edward.  The
amendment was declared carried.
VALEDICTORY
The Provost advised that this was the last meeting of West Dunbartonshire Council
that Christine McCaffary, Senior Democratic Services Officer, would be attending
before her retirement in January 2023, and thanked her for her outstanding service
to Elected Members and West Dunbartonshire Council.  The Council concurred.
COMPLIMENTS OF THE SEASON
Before closing the meeting, Provost McAllister wished everyone a very Merry
Christmas.
The meeting closed at 8.47 p.m.
Page 27

Page 28

Page 28

Page 29

WEST DUNBARTONSHIRE COUNCIL
At a Hybrid Meeting of West Dunbartonshire Council held in the Civic Space, 16
Church Street, Dumbarton on Wednesday, 1 March 2023 at 4.00 p.m.
Present: Provost Douglas McAllister and Councillors Jim Bollan, Karen
Conaghan, Ian Dickson, Diane Docherty, Craig Edward,
Gurpreet Singh Johal, Daniel Lennie, David McBride, Jonathan
McColl, James McElhill, Michelle McGinty, June McKay, John
Millar, Lawrence O’Neill, Lauren Oxley, Chris Pollock, Martin
Rooney, Gordon Scanlan, Hazel Sorrell, Clare Steel and Sophie
Traynor.
Attending: Peter Hessett, Chief Executive; Alan Douglas, Chief Officer –
Regulatory and Regeneration (Legal Officer); Laurence Slavin,
Chief Officer – Resources and Section 95 Officer; Peter Barry,
Chief Officer – Housing and Employability; Beth Culshaw, Chief
Officer – West Dunbartonshire Health and Social Care
Partnership, Amanda Graham, Chief Officer – Citizen, Culture
and Facilities; Gail Macfarlane, Chief Officer – Roads and
Neighbourhood; Laura Mason, Chief Education Officer; Victoria
Rogers, Chief Officer – People and Technology; Angela Wilson,
Chief Officer – Supply, Distribution and Property; Michelle Lynn,
Assets Co-ordinator; George Hawthorn, Manager – Democratic
and Registration Services, Carol-Ann Burns, Senior Democratic
Services Officer; and Scott Kelly, Committee Officer.
Also Attending: Tom Reid, Audit Director, Mazars.
Provost Douglas McAllister in the Chair
STATEMENT BY CHAIR
Provost McAllister advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
ITEM 5 (b)
Page 29

Page 30

RECORDING OF VOTES 
The Council agreed that all votes taken during the meeting would be done by roll call
vote to ensure an accurate record. 
REQUEST FOR DEPUTATION – JOINT TRADES UNION 
The Provost advised that a late request had been received to hear a deputation from
GMB, Unite and Unison in relation to the item General Services Budget Setting
2023/24 and 2024/25 - 2027/28 Budget Estimates and Council Tax Setting. 
Having heard the Provost, the Council agreed to suspend Standing Orders 18 (b)
and (e) in order to allow the deputation of Trades Union Representative, three may
address Council for a total together of not more than ten minutes, and to allow the
deputation to remain for the duration of the meeting. 
The Provost invited the delegation, namely David Scott, Margaret Wood, David
Smith and Margo Davenport forward to join the meeting, and Mr Smith, Mr Scott and
Ms Wood were heard in relation to their concerns regarding potential budget cuts. 
The Provost thanked the Representatives for their contributions. 
GENERAL SERVICES BUDGET SETTING 2023/24 AND 2024/25 – 2027/28
BUDGET ESTIMATES AND COUNCIL TAX SETTING 
A report was submitted by the Chief Officer – Resources:- 
(a) summarising the key issues relating to the revenue budget estimates of
council tax for 2023/24 and providing the budget estimates for 2024/25 to
2027/28; 
(b) providing an update in relation to the capital budget; and 
(c) seeking approval to set the General Services revenue and capital budgets for
2023/24 through approval of options to close the 2023/24 budget gap. 
After discussion and having heard from the Chief Officer – Resources and relevant
Officers in further explanation and in answer to Members’ questions, Councillor
Rooney, seconded by Councillor McGinty, moved:- 
Council thanks the Chief Executive and the Chief Officer of Resources for the
detailed report at item 5 comprising a covering report and appendices with a
total of 353 pages. Council also thanks the Chief officer Resources for his
verbal update regarding Scottish Government announcements about funding
and on changes to cost pressures and saving options. This report shows the
level of work that has gone into the budget setting process this year. 
Page 30

Page 31

This is without doubt the greatest financial challenge in the history of West
Dunbartonshire Council. We have increasing cost pressures, limited funding
support from government and we were left with the additional financial burden
as a result of the previous administrations failure to tackle the financial risks.   
Council notes the hugely challenging financial position facing the council as a
result of sustained cuts to its revenue funding since 2007. In the context of
West Dunbartonshire this has cumulatively amounted to over £20 million of
recurring savings having to be made over the period and the exhaustion of the
Council’s reserves.
The Scottish Government’s claim that the local government funding increase
for 2023/24 was £570 million is misleading.  COSLA subsequently
demonstrated that the actual cash increase to core council funding was in fact
a much smaller £71 million equivalent to a significant real terms reduction in
funding.
Given the current extreme financial landscape, the ever increasing lack of
flexibility for councils due to Scottish Government interference, most notably
in respect of the recent announcements regarding teacher numbers, pupil
support staff and learning hours, is resulting in very limited choices in how
councils deliver services.  This will inevitably impact on the provision of vital
community services.
Council agrees that the Scottish Government in power since 2007 has
regrettably demonstrated disdain and contempt for local government in
Scotland and seems to have entirely given up on any pretence of partnership
working or recognition of councils’ legitimate authority to make decisions on
services they deliver on behalf of valued local communities.
Council agrees that quite apart from this disdain and contempt for local
government that the Scottish Government has specifically acted against the
interests of West Dunbartonshire by amending the law in respect of the
application of the Scottish Landfill Tax, effectively reversing a decision of the
Upper Tier Tribunal without any proper consideration of the impact on
Councils. As a result an extra £1.4M of savings has been necessitated by the
Scottish Government’s actions.
This continued ill-considered approach by the Scottish Government to
centralising decision making and imposition of restrictions poses a very
concerning threat to the continued ability of the council to maintain a range of
high-quality services to the public in West Dunbartonshire. Despite the
political and financial context, the Council is still legally required to set a
balanced budget. 
Given the above the Council agrees the following:-
(1) to note the updated position regarding projections for the revenue
budget in 2022/23 as identified at paragraph 4.1.1;
Page 31

Page 32

(2) to note the projected reserves position of the Council as at 31/03/2023
as identified at paragraph 4.1.5;
(3) the revision to the use of the Service Concessionary One-Off Benefit
as identified at paragraph 4.1.6;
(4) to note the projected outturn position for capital for 2022/23 as detailed
in Appendix 5 to the report including information in relation to the re-
profiling of a number of projects and resources into future years;
(5) to approve the savings options in Appendix 2 to the report Summarised
Saving Options and Management Adjustments), to be used to set the
General Services revenue budget for 2023/24 and assist with future
projected budget gaps and use of reserves, all subject to the
amendments appended in Appendix 1 to this motion (shown as
Appendix 1 to these Minutes);
(6) to note the management adjustments to be used to set the General
Services revenue budget for 2023/24 and assist with future projected
budget gaps including the additional £120k detailed by the Chief Officer
Resources;
(7) a 5% increase to the Council Tax rate which will result in a 2023/24
Band D Charge of £1,398.98;
(8) to approve the proposed updated capital plan from 2023/24 as detailed
in Appendix 6 to the report;
(9) that a report will be brought to a future meeting of the Corporate
Services Committee to agree the 2023/24 West Dunbartonshire Leisure
Trust management fee; and
(10) the details of consultation is at Appendix 2 (shown as Appendix 2 to the
Minutes) and the Administration’s, savings, growth items and other
measures to close the budget gap as appended at Appendix 3 to this
motion (shown as Appendix 3 to these Minutes).
Page 32

Page 33

SUMMARY OF BUDGET 2023/24
(£,000)
Budget Gap Before Any Measures to Balance Budget 21,799
Measures Agreed December 2022 -7,065
Updated Gap 14,734
Labour Administration Measures to Balance Budget
Saving Options (See Appendix 1 to this Motion) -6,288
Management Adjustments -1,352
5% Council Tax Increase -1,915
Use of Smoothing Fund (See Appendix 2 to this Motion) -3,000
Use of VERS Reserve (See Appendix 2 to this Motion) -2,249
Labour Growth Items (See Appendix 2 to this Motion) 320
Increase in Turnover Savings (See Appendix 2 to this Motion) -250
Surplus 0
At this point in the meeting Councillor Dickson requested an adjournment of the
meeting to allow consideration of the motion.  The Provost declined the request.
As an amendment, Councillor Dickson, seconded by Councillor Conaghan, moved:-
Council agrees to a Council Tax rise of 5%; this would mean a Band D
property would pay an extra £1.28 per week. This will result in a 2023/24
Band D charge of £1398.98.
Council agrees the management adjustments at the revised figures of
£1,352,000. 
Council notes that there has been no public consultation on either local
priorities nor on the specific savings options presented here today. 
This would be unacceptable at any time, but more so now when we face
having to make serious decisions on drastic cuts to public services, and
greatly reduced investment across West Dunbartonshire. 
Therefore, Council agrees that officers will immediately carry out a public
consultation to allow members to make informed decisions on the budget at a
future meeting, to be called by the Provost at a time and date that allows for
feedback from that consultation to be presented to members as part of the
published meeting papers. This will allow members to make informed
decisions fully understanding the views of our local communities.
There being a remaining gap of £11,467,000, to allow a balanced budget to
be fixed today Council agrees to draw this sum from the Service
Concessionary One off Benefit. At that further meeting having taken full
cognisance of feedback from our communities, any additional savings agreed
will be redirected to Council reserves to assist with future year spending
challenges.
Page 33

Page 34

On a roll call vote being taken 9 Members voted for the amendment, namely
Councillors Conaghan, Dickson, Docherty, McColl, McElhill, Oxley, Pollock, Scanlan
and Traynor, and 11 Members voted for the motion, namely Provost McAllister and
Councillors Johal, Lennie, McBride, McGinty, McKay, Millar, O’Neill, Rooney, Sorrell
and Steel.  Two Members abstained from voting the motion, namely Councillors
Bollan and Edward.  The motion was accordingly declared carried.
DUMBARTON COMMON GOOD BUDGET UPDATE 2023/24
A report was submitted by the Chief Officer – Resources providing an update on the
2022/23 Dumbarton Common Good budget and seeking approval for a revised
2023/24 budget and indicative budgets for 2024/25 and 2025/26.
The Council agreed:-
(1) to note the probable 2022/23 outturn as set out in Appendix 1 to the report;
(2) to approve the revised 2023/24 budget as set out in Appendix 1 to the report,
including the approval of additional budgets for the Pipe Band Championship
of £50,000, £10,000 for resources for Dumbarton Library and an increase in
grant of £13,706 for Alcoholics Anonymous;
(3) to note the indicative budgets to 2025/26 as set out in Appendix 1 to the
report; and
(4) to note the projected balances available for carry forward of £615,424 at 31
March 2023 and £584,446 at 31 March 2024 (based upon the revised draft
2023/24 budget).
CAPITAL STRATEGY 2023/24 TO 2031/32
A report was submitted by the Chief Officer – Resources providing the updated
capital strategy for the period 2023/24 to 2031/32.
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed to approve
West Dunbartonshire Council’s updated capital strategy for the period 2023/24 to
2031/32.
HOUSING REVENUE ACCOUNT (HRA) ESTIMATES AND RENT SETTING
2023/2024
A report was submitted by the Chief Officer – Housing and Employability:-
(a) seeking approval of the updated HRA capital programme;
(b) seeking approval of the HRA revenue budget for 2023/24; and
Page 34

Page 35

(c) seeking agreement of the level of weekly rent increase for 2023/24 which is
sufficient to fund the revenue budget for 2023/24 and the associated capital
investment programme. 
Councillor Johal, seconded by Councillor McGinty moved:- 
Council thanks the Chief Officer and all of his staff for their work in preparing
the report for consideration by elected members. 
Council also records its thanks to the Tenants Representatives and the
individuals who have taken part in the tenant consultation which informs the
decision today. 
The consultation included two options with 52.9% supporting a 4% increase in
rents; while 47.1% supported a 5% increase. 
The difference in the average weekly rent between the two options was £0.84
pence. 
However, the increase by 5% provided an additional £50m of capital
investment over the next five years in housing to address a number of
priorities (shown in Appendix 4 to these Minutes). 
Given the above, the Council agrees the recommendations in the report but
with an important difference and after consultation with the WDTRO to
increase weekly rent, pitch rent at the Gypsy Travellers site, and lock-up rents
by 5%, as detailed below:- 
This means a weekly average rent increase of £4.22 for tenants, of whom
72% are in receipt of Housing Benefit/Universal Credit. 
We are aware any increase can be hard on our tenants especially through the
current cost of living crisis, and to support our most disadvantaged tenants we
have set aside £565k of direct financial assistance to support them over the
course of the next financial year. 
The Administration has ambitions to develop our Housing Service to become
sector leading, meeting and exceeding the needs and expectations of our
tenants, now and into the future.  This requires greater investment in tenants’
priorities such as: 
• More new sustainable housing that is attractive, built to the highest
standards and net zero carbon
• More homes to suit the needs of larger families 
• More homes to address identified medical needs 
• Better homes where we respond proactively to damp and mould issues
• Better  homes that are energy efficient
• More homes to increase choice and opportunities for families   
Page 35

Page 36

In order to increase the housing supply and the quality of existing properties, the
Council agrees the following:
• Use £10m to increase the Council’s buy back programme over the next five
years to
purchase additional housing on the local housing market to address identified
need
• Use £40m to accelerate the following renewal and replacement programmes
over the next five years that our tenants have told us are most important to
them:-
o Energy efficiency measures including new heating systems
o Kitchen and Bathroom Renewals
o Window/Door Renewal Programmes
o Accelerate a programme to eliminate damp and mould problems from
our tenants homes
The Chief Officer and his management team is asked to develop the programme of
additional £50m of capital investment in full consultation and involvement of the
WDTRO and report back on progress at future Housing and Communities
Committees.  This programme will set out in detail the scale of additional
development and improvements across our housing stock.
As an amendment, Councillor Conaghan, seconded by Councillor Traynor, moved:-
That the Council agrees the recommendations stated in the report, namely:-
(1) to note the outcome of the tenant consultation process detailed in
Appendix 1 to the report;
(2) to note the projected break even revenue position for 2022/23;
(3) to note the progress made, per Appendix 2 to the report, in the HRA
capital programme for 2022/23;
(4) the updated five year capital programme of work set out in Appendix3
to this report inclusive of the Council’s new house building programme
and the overall resources to fund the programme
(5) the revenue budget for 2023/24 as detailed in Appendix 4 to the report;
(6) the 4% weekly rent increase for 2023/24 at an average £3.38 on a 52
week basis (£3.73 on a 47 week basis), equating to 4% to meet the
planned revenue HRA budget as detailed in Appendix 4 to the report;
(7) to increase rents at the Gypsy Travellers site by the 4%; increasing
pitch rent by £3.08 to £80.09 on a 52 week basis (£3.41 to £88.61 per
week on a 47 week basis);
Page 36

Page 37

(8) to increase the lock-up rents by 4%, increasing rent by £0.22 to £5.66
per week on a 52 week basis (£0.24 on a 47 week basis to £6.26);
(9) to note the increase in the prudential reserve target for 2023/24 (from
£0.940m to £0.984m); and
(10) the recommended use of the projected reserves as at 31 March
2023 for the purposes identified at 4.3.4 of the report.
On a roll call vote being taken 9 Members voted for the amendment, namely
Councillors Conaghan, Dickson, Docherty, McColl, McElhill, Oxley, Pollock, Scanlan
and Traynor, and 13 Members voted for the motion, namely Provost McAllister and
Councillors Bollan, Edward, Johal, Lennie, McBride, McGinty, McKay, Millar, O’Neill,
Rooney, Sorrell and Steel.  The motion was accordingly declared carried.
The meeting closed at 8.15 p.m.
Page 37

Page 38

Appendix 1
Ref: Saving Option Officer
Proposed
Saving
(£,000)
Labour
Group
Decision
Labour
Group
Saving
(£,000)
CCF01 Co-locate Dalmuir Library and Dalmuir Community Centre within
the existing Community Centre building
14 Accept 14
CCF02 Consider further options for co-location and closure - in
particular potential options for Balloch, Parkhall, Duntocher,
Faifley and Dalmuir 
277 Accept
Option 1
50
CCF03 Reduce West Dunbartonshire Leisure Trust's management fee 
by 10%
416 Accept 10%
Reduction
416
CCF06 Generate additional income through commercialisation
opportunities at Church Street, Bruce Street Baths and Aurora
House including letting available space to third parties.
77 Accept 77
CCF09 Reduce the number of days Clydebank Town Hall  is open from
either six to four or six to three.
40 Reject 0
CCF12 Replace face to face citizen service provision at Church Street
reception with phone access to contact centre
30 Reject 0
CCF13 Reduce community facility provision across West Dunbartonshire
to a level more consistent with neighbouring local authorities 
through a combination of closure and community asset transfers.
Reduction of 7.8 FTE in WDLT staff
257 Accept 257
CCF16 Remove two posts across the Communications, Culture and
Performance areas which would reduce resource available to
support services such as  Arts and Heritage; Communications,
Marketing and Events and Performance and Strategy.
80 Accept 80
CCF18 Reduce opening hours and/or days across the library network  95 Accept 95
CCF19 Review provision of library services within the school estate  to
consider part time or term time only provision
40 Accept
Option 2
20
CCF20 Reduce staff numbers in the Customer Contact Centre and
promote a digital first approach encouraging more residents to
self serve and submit enquiries via the Council website.
90 Accept 90
CCF21 Reduce funding provided to Shopmobility by up to 90% 43 Reject 0
CCF22 Reduce funding provided to Antonine Sports Centre by up to 90% 44 Reject 0
EDU03 Reduce the number of learning assistants in schools by 2.34 FTE
from the current establishment of  28 FTE. 
32 Accept 32
EDU07 Reduce the school clothing grant to the statutory level of £120
for primary school children and £150 for secondary school
children
839 Accept
Option 1
774
Page 38

Page 39

EDU09 Reduce  the provision of clerical support hours in primary schools  0 Accept 0
EDU11 Reduce the Education Maintenance Allowance payment from
£35 every two weeks to the statutory level of £30 every two
weeks.
47 Reject 0
EDU12 Remove breakfast club provision in all primary schools 142 Reject 0
EDU13 Remove the provision of free swimming lessons  for children in
primary 4 
14 Reject 0
EDU15 Reduce the budget for grounds maintenance and either reduce
frequency of grass cuts in educational premises or create areas
of biodiversity which would not require grass cutting
100 Accept 100
EDU16 Provide statutory education provision over a four day week with
a programme of activities provided on the 5th day in secondary
schools
1,338 Reject 0
EDU17 Review the role of  Senior Early Learning and Childcare Officers 
enabling the removal of six Early Learning and Childcare Officers
posts 
119 Accept 119
HE01 Reduce anti-social behaviour service by removing
backshift/weekend provision and limiting to phone provision
within normal office hours.
272 Accept
Option 3
127
HE02 Remove or reduce the Modern Apprenticeship Pathway Scheme 250 Accept
Option 1
50
HE04 Reduce the Communities Team by 50% or Restructure
Communities Team by bringing W4U Youth Learning Team and
wider Community Planning support into the Communities Team
447 Accept
Option 2
383
HE07 Reduce the Working 4U Service by up to 25% 1,145 Accept
Option 3
1,145
HE08 Reduce funding provided to West Dunbartonshire Citizen Advice
Bureau by up to 90%
314 Accept
Option 1
87
HE10 Reduce funding provided to Y-Sort-it by up to 90% 141 Accept
Option 1
39
HE11 Reduce the number of Tenant Liaison Officers from four to two 99 Accept 99
HE12 Mitchell Way Office Accommodation Rent 41.5 Accept 41.5
HE13 Reduce the level of  funding available to Community Councils 11 Accept 11
PT05 Reduce pay preservation period 0 Reject 0
PT06 Reduction in ICT Management 50 Accept 50
PT07 Reduction in ICT Support 82 Accept 82
RES01 Reduce the size of the Council's Audit & Fraud team by removing
1.8TE of vacancies rising to 2.8 in future years
75 Accept 75
Page 39

Page 40

RES03 Remove the provision of £15 per annum to each resident over
the age of 67 via the Elderly Welfare Grant
110 Reject 0
RES04 Remove voluntary grant funding provided to West
Dunbartonshire Community & Volunteering Services and reduce
funding provided to the Clydebank Asbestos Group by 25%
173 Accept
Tullochan
Trust
Alternative
Funding -
Reject the
rest
17
RES05 Remove the Provost Hospitality Fund  which is used for
hospitality for provost hosted events  and for commemorating
special events within the community 
37 Accept
Reduction of
£9,000
9
RES10 Reduce the size of the Council's Insurance Management team
from four officers to three. 
50 Accept 50
RES11 Reduce manual processing by automating the generation of
debtor and creditor invoices
25 Accept 25
RES21 Reduce the size of the Council's Automation team from three to
two in 2023/24 and by a further one in 2024/25
37.5 Accept 37.5
RES22 Reduce accountancy provision by removing one vacant post and
transferring 70% of a post to work charged to the HRA
73 Accept 73
RN01 Reduce or remove the provision of school crossing patrollers 95 Reject 0
RN04 Review the charging policy for the Care of Gardens scheme or
remove provision entirely
440 Accept
Option 2
211
RN06 Reduce or remove the provision of weekend litter collection at
key destinations such as parks and town centres
140 Accept
Option 1
47
RN08 Introduce charging for garden waste collection 64 Reject 0
RN09 Reduce provision of grass cutting, bin clearing, litter collection
and street sweeping
400 Accept
Option 1
460
RN10 Improve recycling rates through a review of the programme  of
residual waste collection
50 Accept 50
RN12 Reduce or remove provision of footway gritting 128 Reject 0
RN15 Transfer the provision of Christmas lights to community groups
or traders associations with assistance provided by the Council at
switch on events
25 Accept 25
RN16 Roads Review of Activities to Support Education 34 Reject 0
RN17 Environmental Trust Grant Reduction 87 Accept
Option 2
87
Page 40

Page 41

RR12 Reduce support provided to local businesses and organisations
including  a reduction in officers within the Council's economic
development team
169 Accept
Option 2
169
SDP01 Non regulated procurement under £2m to be carried out by
services and remove need for procurement monitoring activity
for contracts awarded under that threshold
110 Accept 110
SDP02 Non-Complex procurement  to be carried out by services and
remove need for procurement monitoring activity for those
contracts
148 Accept 148
SDP03 Review and improve purchase to pay administration procedures
reducing the need for Corporate Procurement Unit support and
allowing services to fully undertake purchase to pay  activities
99 Accept 99
SDP11 Reduce Consultancy Services and Capital Investment Team 212 Accept 212
SDP13 Reduce the resource in the Asset Management team from 22.14
FTE to 19.14 FTE removing three posts.   This generates a capital
budget saving rather than revenue.
0 Accept 0
SDP14 Review the use of Municipal Buildings to identify alternative uses
or commercial opportunities 
37 Accept 37
SDP15 Review possible early closure of Clydebank Town Centre Office
with employees based there relocated to alternative Council
accommodation
108 Accept 108
SDP16 Two week Christmas closedown bar delivery of essential services 6.5 Reject 0
Total 9,920 6,288
Page 41

Page 42

Appendix 2 Budget Consultation
2015: The last budget consultation public meeting was held in the Town Hall in 2015 under Labour with
participants using electronic voting to register their agreement or disagreement with each option. 
2016: No public consultation activity.
2017: No public consultation activity.
2018: The last standard budget consultation (consulting on each saving proposal) was in January 2018 when
there were questions asked on line seeking views on individual options. 
2019: The last priority based budget consultation was on-line in 2019 (primary education, secondary
education and roads were residents’ top three priority service areas). 
2020: No public consultation activity
2021: No public consultation activity
2022: Savings options were submitted by the SNP Council last year with no public consultation. 20220309 -
202223 Budget Setting - Appendix 2 - Saving Options.xlsx (west-dunbarton.gov.uk)
2022/23: Consultation took place on the Council’s strategic priorities for the 5 Year Strategic Plan. A
consultation was undertaken as part of the development of the strategic plan which went to chief officers
and elected members, our strategic partners including via schools, housing, community team and to
community groups, equality and diversity groups, and also promoted via social media, the website site,
intranet and a release issued to the local media and paper copies available from libraries and leisure centres
The Council engages with residents throughout the year. 16 separate consultations were undertaken to date
during 22/23 and this included statutory and non-statutory. In addition the Council gathers feedback from
residents via the Citizens Panel and monthly telephone satisfaction surveys of 100 residents. 
There is also service specific engagement such as via the housing service with tenants associations and
groups, from the communities team with community groups including as part of community budgeting and
community councils, and from education with parents/carers and pupils. 
The last budget consultation in 2019 was to ascertain resident’s priorities and as such the results remain
relevant for this and future years.  The priorities at that time of primary education, secondary education and
roads have been reflected and reinforced by more recent citizens panel survey and the consultation on the
2022-2017 Strategic Plan.
In relation to this year, all impacted groups were directly informed of the potential options on 16 February
and directed to the Council website to view these in detail alongside the Council report. This provided an
opportunity to raise questions or contact members in advance of the budget meeting.
Equality Impact Assessments have been undertaken and these prompt consideration of groups with
protected characteristics as well as detailing all engagement activity undertaken by services as part of the
preparation of the options.
The options are informed by data and developed by officers with a view to ensuring elected members have
the required details available to make an informed decision. 
Page 42

Page 43

West Dunbartonshire Council
Budget 2023-24
March 2023
BUDGET 2023/24
upporting communities to thrive during the
cost of living crisis is at the heart of the
Council’s 2023/24 budget. 
Following the success of £3million investment in
cost of living initiatives last year – including a
£2million Cost of Living Fund and £1million Cost
of Living Capital Fund – we are now strengthening
our offer to ensure residents and communities can
access the support they need. 
In the face of the biggest financial challenge in the
Council’s history and the cost of living crisis
impacting on ever increasing numbers of our
residents, we are focusing our investment to
protect the most vulnerable, provide support to
those who need it most and help our young people
to realise their potential. 
It means that families, young people, carers and
community groups will all receive additional
support as part of a package of measures
introduced in the council budget.  
The plans outlined below include a school meal
hardship fund for any family struggling with the
cost of living; additional funding to foodbanks
each month to support their operation and
increased demand; and enhanced Educational
Maintenance Allowance for pupils who stay in
school, including a top up for those who have
caring responsibilities.
We want to introduce these measures to protect
the vulnerable and shield our communities as
much as possible from the scale of the financial
challenge we are faced with as lack of fair funding
from the Scottish Government means we have no
choice but to progress with some of the proposed
savings options.
We have a legal obligation to balance the budget
and in order to reduce the number of savings
affecting services our residents rely on, we have
made the difficult decision to implement a Council
Tax increase, with the knowledge that the most
vulnerable will be protected from this through
support mechanisms in place.
SOCIO-ECONOMIC CONTEXT
West Dunbartonshire is one of Scotland's smallest
local authorities and accounts for 1.6% of the
Scottish population. It is also has some of the
highest concentrations of poverty in Scotland. Of
the lowest 20% of the Scottish Index of Multiple
Deprivation (SIMD), 40% of these fall within West
S
Appendix 3
Page 43

Page 44

West Dunbartonshire Council
Budget 2023-24
Dunbartonshire. Overall life expectancy is low in
comparison with Scotland as a whole.  
Female life expectancy is the third lowest in
Scotland behind Glasgow City and Inverclyde at
78.8 years; and male life expectancy is third lowest
behind Glasgow City and Dundee City at 74.1
years. The population mid-year estimates for 2020
was 88,340.  This is a decline of 590 people or 0.7%
on the previous year (88,930 in June 2019) and is
the third greatest percentage population decline
of all Scottish local authorities.  
The declining population in West Dunbartonshire
has been a consistent trend over the previous 10
years (a 2.7% decline from 2010-2020) and 20
years (a 6% decline from 2000-2020). This is in
contrast to Scotland as a whole. The greatest part
of the COSLA distribution formula is based on
population size, so areas with growing population
will get a rising share of the funding, while areas
like West Dunbartonshire with a reducing
population will see their share of funding reduced.
This is more pronounced when the Scottish
Government reduces the size of the available
funding.  
COST OF LIVING FUND 
In June 2022 the Council set up a £1,000,000
earmarked reserve to support cost of living
initiatives. The funding included the original
£400,000 cost of living fund plus an additional
£600,000. The spending committed during
2022/23 included:
● Creating an Energy Fund where households
could be referred to for a £200 grant to help
with fuel bills. £250,000.
● Introducing a Foodbank Supplement of £1,000
per week to be shared between West
Dunbartonshire foodbanks to help with the
purchase of food items to supplement
donations from the public and businesses.
£52,000. 
● Earmarked funding for a Community Clean-up
to target additional resources to improve local
neighbourhoods. (Spring 2023). £50,000.
● Increased funding to Antonine Sports Centre
to support sports and leisure programme for
local residents over the rest of the financial
year. £25,000.
● Free Swim, Gym, & Sports Camp for families
over three school holiday periods – Summer
holidays, October week; and Easter holidays.
£45,000.
● Introduced free all-inclusive family
memberships from July to August for families
identified by Working4U. £10,500.
● Supported the Recycling Room with rental
costs for the next 12 months while they
developed a bid to the lottery or other
funders. £8,350.
Page 44

Page 45

West Dunbartonshire Council
Budget 2023-24 
COST OF LIVING GROWTH 
In December, the Administration committed a
further £1,000,000 to the earmarked cost of living
fund. There was also an in year underspend of the
Cost of Living Fund this year of £558,000. This has
been added to the additional £1m announced in
December, giving a total fund of £1.558 million. 
The administration has decided to allocate
£1.326m in the fund as part of the Council budget
leaving a balance of £232,000 for future
allocation. The cost of living fund will be used to
provide funding for a range of cost of living
initiatives over the next three years. The details
are set out below:
● Cost of Living 1: Enhancement to the Schools
Summer Programme. £100,000 per year for
four years. £400,000.
● Cost of Living 2: Create a four year School
Meal Cost Hardship Fund to help families
struggling with the cost of living. £60,000 per
year. £240,000.
● Cost of Living 3: Additional Support for
Apprenticeships. £50,000 per year for four
years. £200,000.
● Cost of Living 4: Fund the successful spending
on Sport & Leisure for children during holiday
times for the next four years. £45,000 per
year. £180,000.
● Cost of Living 5: Additional investment to the
energy fund to cover winter 2023/24.
£125,000.
● Cost of Living 6: Transitional Funding Support
to Y-Sort-It over four years to give them time
to secure funding from external funders
without impacting on their current activities
and plans. £39,000 per year. £156,000.
● Cost of Living 7: Introduce a programme of
creative engagement and learning focused on
supporting people through recovery and
improving wellbeing. £5,000 per year for four
years. £20,000. 
● Cost of Living 8: One-off funding of £5,000 for
West Dunbartonshire Kinship Carers to
support their activities and additional set-up
costs as they move into their new centre, and
to mark National Kinship Carer week.  The WD
Kinship Carers are also encouraged to submit
a bid to the Cost of Living Capital Fund for
equipment for their new premises. 
COST OF LIVING £1M
CAPITAL FUND 
West Dunbartonshire Council agreed to make
available £1,000,000 of capital funds to help
community organisations with their cost of living
initiatives. The fund was launched on 31 October
and the intention was to phase the funding over
the next four years, allocating £250,000 each year
until 2025/26. There was significant demand and
£226,924 was awarded in year 1 (2022/23). This
leaves £773,076 to be distributed over years 2-4. 
The successful funding bids for 2022/23 are set
out below:  
Page 45

Page 46

West Dunbartonshire Council
Budget 2023-24
● Dumbarton Area Council on Alcohol received
£39,644 to pay for double glazing, central
heating, rewiring and flooring, reducing their
energy costs.
● BenView Resource Centre was awarded
£30,000 for a new energy efficient boiler
reducing costs to support their activities.
● Awestruck Academy was awarded £29,589 to
upgrade nursery, kitchen, IT suite and leisure
equipment to provide a variety of services to
the community in Clydebank.
● Lomond and Clyde Care & Repair was
awarded £22,000 to purchase a van to help
with the delivery of housing repair services to
private owners.
● Faifley Community Council was awarded
£20,000 to purchase a new van for collection
and delivery of food and other donations.
● West Dunbartonshire Community Foodshare
was awarded £19,413 for a replacement van
to support deliveries and collections of food
and other donations.
● Y Sort It was awarded £15,120 to help reduce
energy costs through the renewal of windows
in gym hall, stage and activity area.
● Tullochan was awarded £9,663 to purchase a
commercial range cooker and ventilation for
the Common Good Café.
● Daniel's Wish was awarded £9,143 for the
purchase of sensory equipment to help
children and young people with complex
needs.
● Dalmuir Church Drop in Pantry was awarded
£7,643 to purchase an industrial cooker,
dishwashers and IT equipment
● Clyde Shopmobility received £6,870 to help
with the purchase of computer equipment,
mobility scooters and mobility aids to support
their services for disabled people. 
● Our Warriors was awarded £5,000 to
purchase sensory equipment for their group.
● Clydebank Men's Shed received £4,100 for
replacement saws and ancillary equipment to
support their activities addressing isolation.
● Mini Messy Monsters were awarded £3,800
to purchase sensory equipment to support
their activities.
● Carers of West Dunbartonshire were
awarded £3,309 to purchase laptop, projector
and accessories to help the organisation
to provide support to unpaid carers.
● Isaro Community Initiative was awarded
£1,000 to help with fixtures and fittings for a
community drop in.
The Chair of the cost of living working group
organised a conference during 2022 and a second
cost of living conference is planned for 2023 to
share experiences and to highlight the remaining
Cost of Living Capital funding of £773,076 for the
next three years.  
BUDGET GROWTH (REVENUE)
The administration identified a number of priority
areas for growth in its revenue budget to support
families affected by the cost of living. Some
initiatives will be funded in the short term as a
one-off, others are scheduled to provide support
over three years while others will be recurring
spends. 
● Labour 1: Increase food subsidy to foodbanks
from £1,000 per week to £10,000 per month
for the next three years. £360,000. £120,000.
Page 46

Page 47

West Dunbartonshire Council
Budget 2023-24
● Labour 2: Increase the current Education
Maintenance Allowance from £35 to £40.
£47,000.
● Labour 3: Increase funding to Antonine Sports
Centre & SLA to support the Council’s sports
activities over the summer, October week and
Easter. £25,000.
● Labour 4: Revenue funding to hire an
additional gully motor to carry out targeted
gully cleans at flooding hot spots.  This will
fund 8 weeks in total and the proposal is to
split this into 2 sets of 4 weeks activities, 4
weeks Spring and 4 weeks Autumn to
proactively target the times when there are
either leaf fall or seasonal rainfall.  £25,000.
● Labour 5: Introduce a Young Carers EMA
supplement of additional £10 to support
young people with caring responsibilities.
£20,000.
● Labour 6: Create an earmarked Community
Wellbeing Fund to support community groups
with up to £2,000 for hall and facility hire.
£20,000.
● Labour 7: Reverse the Management
Adjustment for Nuclear Free Local Authorities.
£1,500.
● Labour 8: Business Support - Reduce
Environmental Health Charges by 50% for
businesses with Private Water Supplies. The
current charge is £486. The charges are based
on cost recovery but the Council has relatively
high costs. Six businesses are affected by the
reduction.  £1,458.
● Labour 9: Create an earmarked Community
Transfer Support Fund to help local groups
take over management and control of
community buildings and facilities no longer
part of operational requirement. £60,000.
BUDGET GROWTH - CAPITAL
The ten year capital plan was updated in
December to reprioritise planned works and to
contribute to revenue savings in the short term.
Further capital investment to benefit our
communities includes: 
● Labour 10: £50,000 capital to upgrade gullies
in Linnvale area, replace the gully pots and
carry out any repair or replacement works to
the gully connections.
● Labour 11: £20,000 river bank erosion repair
in the vicinity of Levenhowe to compliment
the vegetation cutback already committed.
● Labour 12: £150,000 on improvement to
Goldenhill Park including a new Multi-Use
Games Area (MUGA), environmental
improvements and replacement of the
historic flagpole for a permanent flag marking
the parks heritage surrounding the Roman
Fort and Antonine wall.
● Labour 13: The Council has a large waiting list
for allotments and agreed to progress with
allotments at Dillichip Park in Bonhill. In order
to properly address the identified need and to
recognise the social and environmental
benefits of allotments, the Council will spend
a further £270,000 to create additional
allotments on Dumbarton Common.
Page 47

Page 48

West Dunbartonshire Council
Budget 2023-24 
GROWTH ITEMS IN THE BASE
BUDGET
The Council’s base budget has grown from
£251.7m in 2022/23 to £258.9m in 2023/24.
However, the extra funding is for Scottish
Government priorities, it doesn’t provide enough
funding to support core services or fully fund local
government pay awards. The details of the
spending is as follows: 
● Base Budget Growth 1: Real Living Wage
(HSCP).  The council has received £1.686m to
deliver a £10.90 minimum pay settlement for
adult social workers in commissioned services.
● Base Budget Growth 2: Free Personal &
Nursing Care (HSCP) This additional funding of
£144,00 is an inflationary uplift for Free
Personal Nursing Care rates although this is
more than offset by the removal of non-
recurring care money of £336,000 provided in
2022/23.
● Base Budget Growth 3: Whole Family
Wellbeing - The Council has received £602,000
to help families overcome challenges and
reduce the number of children and young
people in care by 2030.
● Base Budget Growth 4: Local Energy Strategy
We have received a share of £75,000 for the
Local Energy Fund to help us with home
energy efficiency schemes.
● Base Budget Growth 5: Devolution of Empty
Property Relief: The Scottish Government has
devolved new powers to the Council to
provide for greater flexibility around setting
reliefs and have provided funding amounting
to £862,000 to fund this.
● Base Budget Growth 6: 2022/23 Pay Award
Following negotiations with the recognised
trades unions the pay award for 2022/23 was
agreed. This means an additional 5% for
Council staff. This created a cost pressure of
£5.640m in addition to the 2% assumption
already built into the Council’s budget. The
Scottish Government provided £4.748m
toward this additional pressure meaning the
Council needed to fund £892,000 of it.  The
uplift was paid to staff prior to Christmas and
has been built into the base budget. 
GENERAL CAPITAL
INVESTMENT
The Council will continue with its programme of
investment in the General Fund and has
committed tens of millions of pounds over the
next four years including:   
 Capital Investment 1: We will continue our
investment in the new £35.619m Faifley
Campus.
 Capital Investment 2: Investment in our Exxon
City Deal Project will accelerate over the next
four years and will see £30.065m with the aim
to complete the project in financial year
2026/27. 
 Capital Investment 3: The Councils successful
stage 1 bid to the UK Levelling-Up Fund will
mean that we will spend £19.634m in
2023/24. This project includes regeneration of
the Artizan Centre in Dumbarton, the upgrade
of Glencairn House, and road safety
improvements to better connect the town
centre with Dumbarton Central Station. 
Page 48

Page 49

West Dunbartonshire Council
Budget 2023-24
 Capital Investment 4: Between 2023/24 and
2026/27 the council will invest £14.508m in
Gruggies Burn Flood Prevention scheme.
 Capital Investment 5: The District Heating
Network in Clydebank will be expanded over
the next three years with £11.220m of
investment in infrastructure.
 Capital Investment 6: We are investing
£10.160m to improve roads over the next four
years.
 Capital Investment 7: The Council has
committed £7.667m towards the
development of a new depot.
 Capital Investment 8: The Council has a
regeneration fund of £4.848m to spend over
the next four years.
 Capital Investment 9: We have earmarked
£5.377m for vehicle replacement over the
next four years.
 Capital Investment 10: Between 2023/24 and
2026/27 we will invest £4.376m in
Regeneration & Economic Development.
 Capital Investment 11: £4.728m has been
earmarked for the schools estate
improvement plan to be spent between
2023/24 and 2024/25.
 Capital Investment 12: £3.082m is committed
for special needs aids and adaptations for
health & social care clients over the next four
years.
 Capital Investment 13: New Westbridgend
£2.262m in the capital plan for 2023/24-
24/25. It’s also hoped that we are successful
in our bid to the Capital Regeneration Fund to
support the full project costs.
 Capital Investment 14: This year we will also
spend £1.935m in a new waste transfer
station.
 Capital Investment 15: We are investing
£1.590m in Strathleven Place to create a new
heritage facility.
 Capital Investment 16: Over the next four
years we have committed £1.550m in flood
risk management across the council area.
 Capital Investment 17: The Council is
investing £1.317m in schools to support the
expansion of free school meals.
 Capital Investment 18: £340,000 will also be
spent on a new sports changing facility in
Dumbarton West as part of our commitment
to the local community.
SPORTS, PLAY &
COMMUNITY FACILITIES
The Council is already planning to develop two
new MUGA’s at Breval Crescent and Milton Park
which together is an investment of £250,000. In
addition, there will be a further investment of
£220,000 investment in resurfacing East End Park
3G pitch. We will also see the £1m Vale of Leven
Cemetery extension take place over this summer. 
The Administration is keen to continue its
investment in parks, play facilities, sports facilities
and other community facilities. Over the next four
years we plan to invest £1.4m in these facilities.
The fund will support improvements to 51 play
areas. A report to a future IRED will provide
detailed costings and proposals. This will ensure
Page 49

Page 50

West Dunbartonshire Council
Budget 2023-24 
that all of our play parks are accessible and
inclusive. 
Year 1 - Financial Year 2023/24 £460,407 
 Moss Teen Site £75,000
 Brown Street £4,370
 Bannachra Crescent (J) £2,370
 Bannachra Crescent (T) £4,347
 Braeside Dr Toddler £2,370
 Firth View £74,000
 Garshake Avenue £1,358.
 HighMains £39,689
 Kyle Terrace £60,172
 Overburn £1,000
 Westcliff £65,000
 Stuart Avenue £32,981
 Craigielea Road £55,112
 Melbourne Avenue £29,088
 Montreal House £13,550 
Year 2 - Financial Year 2024/25 £336,873 
 Pappert £70,000
 Dennystoun Forge £7,550
 Milton Park £19,730
 Lusset Park £70,000
 Braes Avenue £81,116
 Dalmuir Park £88,477 
Year 3 - Financial Year 2025/26 £480,566 
 Balloch Park Junior £20,131
 Balloch ParkToddler £19,950
 Moss Toddler Site £49,936
 Alexandria £58,115
 McColl Avenue £20,369
 Christie Park Junior £5,528
 Dalmonach £25,345 
 Ladyton £12,100
 Dillichip £11,336
 Braeside Dr Junior £15,860
 Dumbarton Common £8,200
 Dumbarton East £47,678
 Bowling £25,170 
 Thistleneuk £17,222
 Goldenhill Park £758
 Langfaulds Crescent £20,420
 Linnvale £12,396
 Kirkoswald Drive Teen £28,900
 Kirkoswald Drive Toddler/Junior £24,723
 Onslow Road £26,662
 Stark Avenue £3,070
 Whitecrook Park £36,697 
Year 4 - Financial Year 2026/27 £104,198 
 Ledrish Avenue £4,313
 Rosshead £58,717
 Christie Park Toddler £2,285
 Wylie Park £11,500
 The Cewsy £10,000
 East Thomson Street £4,000
 Vanguard Street £2,000 
 St Helena Crescent £11,383 
FLOOD PROTECTION
A budget allocation of £500k was made in the
2022/23 budget to accelerate flood prevention
works. The IRED Committee in November
approved £375k to be allocated to accelerate
feasibility studies for a number of priority
locations that are identified within the Surface
Water Management Study.  Linnvale has been
identified as a priority location.   
SEPA has advised that the Council can move
straight to the Surface Water Management Plan
for Clydebank therefore the Council can progress
quicker to recommended solutions and costings
than can be presented for consideration.  This will
be in liaison with Scottish Water to reduce the
Page 50

Page 51

West Dunbartonshire Council
Budget 2023-24 
impact of surface water within the area with water
storage and drainage system upgrades. 
In addition the Council has allocated £75k to
promote and install property protection to
residents within the risk areas of River Leven,
Levenhowe, Gruggies Burn and within the
Clydebank area.  The issuing of letters has
commenced to residents making them aware of
the scheme. 
£50k has been allocated to embankment
improvements and vegetation clearing within the
Gruggies Burn, River Leven and Levenhowe as well
as other urban watercourses within the
area.  Gruggies Burn detailed design is underway
with consultation being programmed to share the
design proposals. 
BUILDING RESILIENCE
The Administration has taken action to ensure
that we are better prepared for the future. We
built in resilience to the draft budget in December
to help with the 2022/23 budget and the 2023/24
budget: 
● We doubled our 2023/24 budget assumption
for pay awards from 2% to 4%.
● We created a £15m Voluntary
Severance/Early Retirement fund to fund
staffing reductions. 
● We created a £6m smoothing Fund to support
the changes.
● We cleared the projected 2022/23 £1.5m
overspend which resulted from cost
pressures.
● We increased provision for energy costs and
other cost pressures.
● We increased the Prudential Reserves by
£1.75m to protect the Council against
unforeseen cost pressures.
● The Council initiated recruitment restrictions
to reduce in year expenditure.
● We approved changes to accounting for debt
and generated a one-off benefit to the Council
of £29m.
● We reduced the £21m plus budget gap to
£14.6m in December. 
EARLY ACTION
In December the Council took early action to
reduce the budget gap to £14.6 million through
approving saving options. 
● The report also identified £899,000 of
management adjustments.
● The Labour Administration agreed to profiling
of the Council’s capital Programme saving
circa £300,000 in 2023/24 rising to circa
£480,000 by 2025/26. 
● The Administration also committed an
additional £1m of funding to the cost of living
crisis in West Dunbartonshire. 
● A further tranche of savings options were to
be developed for consideration at the Council
meeting on 1st March. 
STRATEGIC PLANNING
The Council agreed the strategic plan 2022/23 to
2026/27 in the knowledge that the Scottish
Government was unlikely to properly fund West
Dunbartonshire Council.  Post COVID-19 and in the
midst of the greatest cost of living crisis in living
memory we recognise our residents need services
and support more than ever and this was reflected
in our strategic plan.  We remain committed to the
Page 51

Page 52

West Dunbartonshire Council
Budget 2023-24
delivery of our key priorities – resilient and
thriving communities, a greener future, a strong
and flourishing economy and an inclusive and
adaptable Council. We will continue to commit all
of our effort and make the case for West
Dunbartonshire nationally to deliver for our
communities and our area and sustain our core
services.
INCOME & RESERVES
The main source of income to the Council comes
from the Scottish Government. West
Dunbartonshire Council will receive £216.755m
from the Scottish Government for 2023/24. In
December, the Council increased its sales, fees,
and charges to 10% to help with the increased
costs of service delivery. 
The Council’s other key source of income is from
Council Tax. In 2022/23 Council Tax raised
approximately £38.1m and it is expected that a
Council Tax increase of 5% will result in estimated
council tax income of £40.254m in 2023/24. 
The 5% increase generates £1.918m and would
increase a band D bill by £1.28 a week (for those
not receiving any CT discount). 
Of the 46,003 properties in West Dunbartonshire,
30,351 receive a council tax reduction or
exemption, with over 8,400 receiving a 100%
exemption/reduction, and 18,938 households in
receipt of a 25% discount (single household).
Some other households will qualify for support at
10% or lower. 
The distribution of properties by Council Tax band
are set out below:
 Band A Properties: 7,547
 Band B Properties: 16,957
 Band C Properties: 7,831
 Band D Properties: 6,189
 Band E Properties: 4,817
 Band F Properties: 1,753
 Band G Properties: 841
 Band H Properties: 66
ADDITIONAL MEASURES TO
BALANCE THE BUDGET
The administration has a legal requirement to set
a balanced budget. In essence as the Scottish
Government has not given us enough funding to
support existing services we have had to raise
revenue and reduce costs. Had we closed the
£21m budget gap with Council Tax alone it would
have meant a Council Tax increase of around 54%.
If we were to close the current £14.7m budget gap
using council tax alone, it would mean an increase
of 38%. Neither of these options are acceptable
especially in the grip of a cost of living crisis. 
Had we tried to close the budget gap by reducing
costs then even if we took the maximum of the
officers’ savings proposals we would still not been
able to balance the books. So on its own, this was
not a credible option either.  
If we were to attempt to close the budget gap
using our reserves, we could have balanced the
budget for a single year but would have increased
our budget gap for next year and been in an even
worse financial crisis than the one the Scottish
Government has out us in and this would have set
us up to fail next year. 
Section 70 of the Local Government Finance Act
1992 requires councils to impose a council tax that
meets expenses not otherwise met through other
Page 52

Page 53

West Dunbartonshire Council
Budget 2023-24
means. Effectively this means any deficit after
applying other funds must be met from Council
Tax. This would require a Council Tax increase in
excess of 38% to bridge the £14.7m budget gap
Council is being asked to consider to agree a
balanced 2023/24 budget. 
If Councillors’ were to decide not to set a balanced
budget in the forlorn hope of the Scottish
Government providing the additional £14.7m, this
would lead to a requirement for the Council’s S95
Officer to submit a report to the full Council for
consideration within 21 days. For that period the
Council would be prevented from entering into
any agreements incurring expenditure until the
full Council had considered the report. 
After considering the report the Council is
required to prepare a report which specifies the
action it proposes to take and the planned
timescales. Where appropriate action is not taken
Council’s external auditors would notify the
Controller of Audit to enable them to take
appropriate action. This may include making a
report to the Accounts Commission which may
lead to a hearing and ultimately could lead to
suspension or disqualification of members of the
Council.
Therefore, the only realistic option is a
combination of increasing revenue, reducing costs
and utilising some of the reserves that were
created in December by the Administration, using
the fiscal flexibilities to help us manage the
Council finances over the next four years. 
 Use of some of the earmarked £6m smoothing
Fund £3m.
 Use some of the earmarked £15m VERS
Reserve Fund:  £2.249m
 Increase Council Tax by 5% to generate
additional income: £1.915m
 Increase turnover target by another £250,000
PROTECTING JOBS
Assuming that the average council FTE job cost
£25,000 per year, every £1m of income would
save the equivalent of 40 FTE jobs or 80 part time
jobs.  The Council is using £5.249m of reserves to
help close the budget gap in 2023/24. This is the
equivalent of supporting around 210 full time jobs
or 420 part time jobs but for one year only.  West
Dunbartonshire currently offers up to 2 years pay
protection for employees impacted by
organisational change, job evaluation and/or
capability issues as part of the SWITCH and
Organisational Change Policy. This compares
favourably with the offerings of many
neighbouring authorities and the Labour
Administration are proud to continue to support
employees by maintaining protection at current
levels. If a no cuts budget was agreed this current
benefit would be at risk. 
BUDGET REALITY
COSLA Leaders submitted an evidence based claim
for at least £1 Billion for Local Government for
2023/24.Our share would have been 1.82% or
£18.2m. At stage 1 of the Budget the Scottish
Government removed £32.8m of baselined
funding for teachers pay without consultation
with COSLA but this was reinstated after COSLA
highlighted it. As part of our Save Our Services
campaign all 32 Council Leaders have written to
the Scottish Government calling for more funding
for Scottish Councils. In addition, all 32 Directors
of Finance wrote to the Scottish Government
raising their concerns about the underfunding of
Local Government. Despite the political and
professional representations, the Scottish
Page 53

Page 54

West Dunbartonshire Council
Budget 2023-24
Government did not increase the funding to
Councils at the final budget stage. 
POLITICAL & FINANCIAL
CONTEXT
We have lobbied for the fair funding West
Dunbartonshire deserves and needs. We have
made the case, highlighted the issues our
residents have to contend with living in an area of
multiple deprivation, the health statistics
including lower life expectancy, the social
challenges including domestic abuse rates, and
the highest number of young people in prison in
the country per head of population. The picture
for too many of our residents is stark, they need
and deserve support to overcome trauma, to
recover, to thrive. We need the Scottish
Government to respond to their crisis now rather
than putting money away for an aspirational
National Care Service which may never happen.
Our financial outlook has been exacerbated for a
variety of reasons but primarily:
 the Scottish Government not fully funding the
2022/23 pay awards
 increases in anticipated waste costs due to the
Scottish Government changing legislation
affecting the amount of landfill tax required to
be paid on waste disposed of in landfill sites
 the Scottish Government providing real terms
funding cuts which leaves the Council having
to absorb the impact of spiralling inflation
 on-going increases in utility costs and the
impact of increases in bank interest rates.
The Scottish Government had an increase of £5.1
billion to its Block Grant over the period 2021/22
to 2024/25 from £36.7 Billion to £41.8 Billion, as
a result of the UK Government Spending Review in
October 2021. This is in addition to £1.8 billion
received through Barnet consequentials in 2022
which included a share of £241m in 2023/24 and
for 2024/25 a share of £287m for local
government and education. This additional
funding was not passed on to local government to
support core services. Based on the COSLA Budget
Reality analysis the Local Government Settlement
announced on the 15 December 2022 equates to
a cash increase to local government of just £71m,
once all commitments are covered for 2023/24.
This is a real terms cut and will have a devastating
impact on our core services. We hoped that as the
Scottish Parliament went through its budget
process, additional funding would be made
available to West Dunbartonshire.  Without it, our
Council is faced with the dreadful prospect of
cutting core services, so despite its rhetoric the
Scottish Government is imposing a new wave of
austerity upon our residents and our communities. 
TEACHER NUMBERS &
FALLING SCHOOL ROLLS
West Dunbartonshire Council believes that the
best people to determine the numbers of teachers
required in our area are the professional officers
of the Council. Teacher numbers associated with
Scottish Attainment Challenge are set to fall over
time as we will have less money overall. Also, with
falling pupil rolls the numbers of teachers required
would fall further.  
The Scottish Government wants West
Dunbartonshire Council to maintain teacher
numbers at 950, despite cuts in funding, falling
roles and no inflation uplift for temporary
teachers recruited to support the recovery from
COVID. This would have the effect of reducing
other services. 
Page 54

Page 55

West Dunbartonshire Council
Budget 2023-24
The Scottish Government started reducing
Scottish Attainment funding by £298,018 in
2021/22 with a 15% cut in funding. In 2022/23
another 17% cut was applied reducing funding
again. For 2023/24 a further 21% reduction is
being applied reducing funding yet again. The
2024/25 reduction will be 26% and the 2025/26
another reduction in excess of 27% is planned by
the Scottish Government. Over the same time our
school rolls (excluding new house builds) are
projected to continue to fall:  
 2019/2020: 12,569
 2020/2021: 12,522
 2021/2022: 12,390
 2022/2023: 12,337
 2023/2024: 12,269
 2024/2025: 12,117
 2025/2026: 11,979
CHIEF OFFICER CITIZEN,
CULTURE AND FACILITIES
Citizen, Culture and Facilities incorporates a range
of services including libraries, arts and heritage,
communications, facilities management, the
Council’s contact centres and performance. In
order to retain library provision in Dalmuir, we
agree that the library will move to be located
within the nearby Community Centre.  This option
CCF01 means the community continues to have
access to the service with jobs retained while
saving £14,000. In addition, we agree that
potential options for co-location of libraries in
Balloch, Parkhall, Duntocher and Faifley can be
explored as detailed in CCF02, with an expected
saving of £50,000. Proposal CCF18 will save
£95,000 by reviewing opening hours and/or days
across the library network, informed by visitor
data which will identify peak usage times. In
addition, we agree to a review of school library
provision in CCF19, with all five mainstream
secondary school libraries operating and staffed
three days a week, with access to pupils for
activities on other days.  This protects the service
and jobs while making a contribution to the
council budget gap, saving £20,000.
In financial year 2022/23, the Council provided
West Dunbartonshire Leisure Trust (WDLT) with a
management fee of £4.16m. The Council is
providing an extra £321,000 to cover pay rises in
2022/23 and will also meet the impact of the
2023/24 pay award.  We agree savings proposal
CCF03 to reduce the management fee but the
uplift in staffing costs means that 2023/24
management fee will increase slightly to
£4.2million. WDLT has £1.4m in reserves and has
recently carried out a restructure. Due to
vacancies all staff have a post in the structure and
any staff displaced receive two years preservation
of their former salary. The transfer of community
facilities to voluntary organisation will also help
WDLT to reduce its costs. In addition, CCF13
proposes to review community facility provision
across West Dunbartonshire to a level more
consistent with neighbouring local authorities and
to address reduced usage post-pandemic.
Through a combination of community asset
transfers or, where no interest exists, closure of
the facility, would save the Council £257,000. 
In order to maximise Council income, proposal
CCF06 will explore commercialisation
opportunities at Church Street and Bruce Street
Baths, including potential to let available space to
third parties, generating £77,000. Another
proposal CCF16 removes two posts across the
Communications, Culture and Performance areas
which impacts resource available to support
Page 55

Page 56

West Dunbartonshire Council
Budget 2023-24
services such as Arts and Heritage;
Communications, Marketing and Events and
Performance and Strategy. This saves a further
£80,000 each year.  Lastly, proposal CCF20- will
review contact centre provision, with a small
reduction in staff numbers alongside the
promotion of a digital first approach encouraging
more residents to self-serve and submit enquiries
via the Council website, generating a saving of
£90,000. 
CHIEF OFFICER EDUCATIONAL
SERVICES
The Educational Services covers early learning
and childcare centres, primary schools, secondary
schools and ASN centres as well as other services. 
The School clerical budget is £1.461 million and
the proposal EDU09 will reduce the provision of
clerical support hours in primary schools saving
£120,000 from 2024/25 onwards. As well as this
savings proposal EDU03 will reduce the number of
learning assistants in schools by 2.34 FTE from the
current establishment of 28 FTE and making a
saving of £32,000. Savings proposal EDU17 was to
review the role of Senior Early Learning and
Childcare Officers enabling the removal of six Early
Learning and Childcare Officers posts and saving
£119,000. For savings proposal EDU15 reducing
the budget for grounds maintenance and either
reduce frequency of grass cuts in educational
premises or create areas of biodiversity which
would not require grass cutting and saves
£100,000. 
The previous administration provided one-year
funding to double the school clothing grant in
2022/23 using COVID funding but there was no
provision for future years. The proposal EDU07
option 1 will return the school clothing grant to
the previous payment of £150 per primary school
children and £150 for secondary school children.
Deciding not to fund this on a recurring basis saves
£774,000 from future budgets. In the current
financial crisis we are not in a position to increase
it in 2023/24 but we will look to increasing the
school clothing grant over time.
CHIEF OFFICER HOUSING,
COMMUNITIES, AND
EMPLOYABILITY
The Housing & Employability service includes
housing development, homelessness services,
housing operations and Working4U services. 
The Council’s Anti-Social Behaviour services has a
budget of £413,000 and 9 FTE staff. With HE01
option 3, we would retain the service and share its
cost with the Housing Revenue Account (HRA) on
a 66%/34% split. This saves £127,000 from the
council general fund costs. The Council has had a
very successful apprenticeship programme
providing training opportunities for local
residents. We want to retain as much of this
service as possible so are committed to investing
£200,000 per year as outlined in HE02 option 1,
which saves the council £50,000 this year. In order
to retain the Communities Team, we agree to
HE04 option 2, which will see a restructure of the
team, bringing W4U Youth Learning Team and
Community Planning support role into the
Communities Team to meet the needs of the
service. This will contribute £383,000 to help close
the budget gap.  The Working4U Service is
discretionary spend and we recognise it provides
Page 56

Page 57

West Dunbartonshire Council
Budget 2023-24
an invaluable service to local people. The service
employs 98 Full Time Equivalent (FTE) staff. The
HE07 proposal will retain 73.5 FTE staff members
to provide a range of financial, employability and
learning support, while reducing the cost of the
service by £1,145,000. Proposal HE08 will see the
Council continue to provide £261,853 to the West
Dunbartonshire Citizens Advice Bureau to support
their services within our communities. This saves
the council £87,000 WDCAB also receive £219,000
from Citizens Advice Scotland and has been
successful in applying for grants in the past from
other funders to support their activities. 
Y-Sort-it is the biggest youth organisation in West
Dunbartonshire. It receives £156,124 from the
Council which it uses to provide a range of services
across the council area. Y-Sort-It also has reserve
funds of £982,619. The proposal HE10 option 1
would reduce the funding by £39,031 and Y-Sort-
It would continue to receive a grant of £117,093
from the Council. Y-Sort It also currently receives
funding from the HSCP of £30,000 and will be
getting a further £189,000 on a recurring basis
from the HSCP for Young Carers.  Some other
savings include: HE11 Reduce the number of
Tenant Liaison Officers from four to two. Saving
£99,000, while HE12 Mitchell Way Office
Accommodation Rent £42,000. The Council
funding for community councils is considerably
higher than some other councils such as Glasgow
City Council. HE13 would reduce the level of
funding available to Community Councils by
£11,000.
CHIEF OFFICER PEOPLE &
TECHNOLOGY
People & Technology comprises Strategic People
& Change services, ICT, Transactional Services
Health, Safety & Risk and Organisational
Resilience. There are two savings proposals
approved: PT06 which will save £50,000 by
removing the ICT business partner, and PT07 will
save £82,000 by reducing ICT support by three
part time roles.
CHIEF OFFICER RESOURCES
The Resources Service is responsible for a wide
range of financial and administrative services,
including Financial Management and control,
Central Administrative support services, Revenues
and Benefits, and Internal Audit and Fraud. The
Administration has approved savings option
RES01 Reduce the size of the Council's Audit &
Fraud team by removing 1.8TE of vacancies rising
to 2.8 in future years. £75,000 rising to £131,000.
The Council also agrees RES04 to remove the
£17,297 grant to Tullochan Trust as this will be
replaced by the No One Left Behind funds
(employability Funds from the Scottish
Government). No impact on the Trust. RES05 will
reduce the Provost Hospitality Fund by 25%. This
is used for hospitality for Provost hosted events
and for commemorating special events within the
community. £9,000. RES10 reduces the size of the
Council's Insurance Management team from four
officers to three. £50,000.
The saving RES11 reduce manual processing by
automating the generation of debtor and creditor
invoices. £25,000. In addition, RES21 will reduce
the size of the Council's Automation team from
three to two in 2023/24 and by a further one in
2024/25. £37,500. Also, RES22 will reduce
accountancy provision by removing one vacant
Page 57

Page 58

West Dunbartonshire Council
Budget 2023-24
post and transferring 70% of a post to work
charged to the HRA. £73,000. 
CHIEF OFFICER ROADS &
NEIGHBOURHOODS
The Roads & Neighbourhood Service is made up of
roads operations, Greenspace, and fleet and
waste. In order to retain the service, we have
accepted RN04 Option 2, which will introduce a
universal charge of £100 for all households who
participate in the scheme. This equates to less
than £2 per week and generates a saving of
£211,000. While savings proposal RN06 option 1
will mean the provision of weekend litter
collection continues, with a staffing reduction of
1.6 FTE, saving £47,000. The non-recruitment of
seasonal staff under proposal RN09 on provision
of grass cutting, bin clearing, litter collection and
street sweeping, makes a saving of £400,000. In
addition, option RN10 will progress to improve
recycling rates through a review of the
programme of residual waste collection while
saving £50,000. Other agreed savings include
RN15, which will see the transfer of the provision
of Christmas lights to community groups or
traders associations with assistance provided by
the Council for any community switch on events,
saving £25,000, and RN17, a £87,000 reduction to
funding provided to the Environmental Trust.
CHIEF OFFICER REGULATORY
& REGENERATION
Regulatory & Regeneration comprises a wide
range of services including legal, licensing,
business support and projects to regenerate the
area. The Economic Development Team savings
proposal RR12 reduces support provided to local
businesses and organisations including a
reduction in officers within the Council's economic
development team. £169,000. 
CHIEF OFFICER SUPPLY
DISTRIBUTION & PROPERTY
Supply, Distribution and Property delivers wide
ranging services which help support the day to day
running of the Council, from asset management,
procurement and providing a positive workplace
for employees. The Administration will accept
SDP01 to allow non regulated procurement under
£2m to be carried out by services and remove
need for procurement monitoring activity for
contracts awarded under that threshold.
£110,000. Also SDP02 non-Complex procurement
can be carried out by services and remove need
for procurement monitoring activity for those
contracts. £148,000, while SDP03 will review and
improve purchase to pay administration
procedures reducing the need for Corporate
Procurement Unit support and allowing services
to fully undertake purchase to pay activities.
£99,000. The savings proposal SDP11 will reduce
Consultancy Services and Capital Investment
Team. £212,000, and SDP13 will reduce the
resource in the Asset Management team from
22.14 FTE to 18.94 FTE removing four posts of
which one is a vacancy. This generates a capital
budget saving rather than revenue. SDP14 reviews
the use of Municipal Buildings to identify
alternative uses or commercial opportunities.
Saving £37,000 and SDP15 review possible early
closure of Clydebank Town Centre Office with
employees based there relocated to alternative
Council accommodation. £108,000. 
Page 58

Page 59

West Dunbartonshire Council
Budget 2023-24 
SAVINGS PROPOSALS
REJECTED
The administration has rejected a number of
savings proposals including: 
 Rejected: Library Closures (co-location will
retain services and jobs)
 Rejected: Changes to Clydebank Town Hall
opening times
 Rejected: Deletion of front of house service
post at Church Street
 Rejected: Reduction of Shopmobility Funding
 Rejected: Reduction of funding to Antonine
Sports Centre 
 Rejected: Reduction of EMA to statutory level
 Rejected: Closure of breakfast clubs
 Rejected: Removal of P4 Swimming Lessons
 Rejected: School 4 day week
 Rejected: Removal of Elderly Welfare Grant
 Rejected: Reduction in pay preservation
 Rejected: Reduction in school crossing
patrollers
 Rejected: Garden waste collection charges 
 Rejected: Footway gritting
 Rejected: Review of activities to support
Education
 Rejected: Two Week Christmas closure 
HOUSEHOLD COST OF LIVING
INCREASES
There has been an enormous surge in costs,
including: 
• A 132% increase in gas prices; 
• A 65% increase in electricity prices; 
• A 38% increase in mortgage interest
payments; 
• A 17% increase in food prices; 
• A 10% rise in the price of buying a house and
• 11% rise in rent for a new rental property.
Consumer price inflation, UK - Office for National
Statistics 
2023/24 BALANCED BUDGET 
2023/24
£,000
Budget Gap Before Any
Measures to Balance Budget 21,799
Measures Agreed December
2022 -7,065
Updated Gap 14,734    
Labour Administration
Measures to Balance Budget  
Saving Options -6,288
Management Adjustments  -1,352
5% Council Tax Increase -1,915
Use of Smoothing Fund -3,000
Use of VERS Reserve -2,249
Labour Growth Items 320
Increase in turnover savings -250    
Surplus 0
Page 59

Page 60

West Dunbartonshire Council
Budget 2023-24
Page 60

Page 61

WEST DUNBARTONSHIRE COUNCIL    
HRA BUDGET & RENT SETTING
March 2023
A BUDGET FOR HOUSING
GROWTH
ith a housing stock of more than 10,000
in communities across West
Dunbartonshire, the Council is the area’s
largest social landlord.
In order to achieve good health and wellbeing, it is
recognised that good quality housing for all is
essential.
That is why over the past decade more than
£82million has been invested in the development
and acquisition of safe, secure, warm, energy
efficient and affordable new homes, as well as
upgrades and enhancements to existing stock.
The Council is committed to continuing this
progress with a range of initiatives which support
increased demand for homelessness support;
requests for larger homes; and the additional
needs of the area’s aging population.
We plan significant further investment to achieve
ambitious housing targets and ensure our
residents experience a thriving and prosperous
West Dunbartonshire.
A key element of Council plans includes continuing
to deliver value for money services for our
tenants. As well as a reactive repairs service, we
are continuing to roll out a range of improvements
and upgrades to homes in area. 
These works - including roof replacements,
upgraded windows and doors and improved
shower systems - are funded through the Housing
Revenue Account (HRA), which is generated by the
rent the Council receives from tenants. 
Each year, the Council asks tenants for their
opinion on how much rent they should pay.
Tenants are asked to vote on which level of
increase and investment they prefer, with the
outcome used to inform the final decision. 
The past three years have brought unprecedented
challenges, including inflation, soaring costs for
building materials and increased demand for
homelessness support.
That is why this year, in order to retain the current
service and capital investment programme, and
see housing growth across West Dunbartonshire,
a 5% rent increase is necessary.
This increase will include additional investment in
housing of £50million, which will ensure the
Council can drive forward a raft of improvements
to existing stock, provide additional homes to
meet demand, and ensure comprehensive
support is in place for any person who finds
themselves at risk of becoming homeless.
Each of these improvements will be of benefit to
tenants, as well as enhancing communities for the
good of West Dunbartonshire as a whole. 
W
Appendix 4
Page 61

Page 62

WEST DUNBARTONSHIRE COUNCIL    
HRA BUDGET & RENT SETTING
TENANT REPRESENTATIVES
The Council recognises the importance of tenants’
views and is grateful for the constructive
discussions with tenant representatives.  The
Council engages with Tenant Representatives
through the Involving You strategic approach.
Currently, the Council liaises with West
Dunbartonshire Tenants and Residents
Organisation (WDTRO), 12 independent Tenant
Resident Associations and an Interested Tenants
Register. In addition, feedback is received through
the Joint Rent Group, Sheltered Housing Forum,
Scrutiny Panel and Estate Walkabouts. Tenant
newsletter Housing News is distributed to all
Council properties every quarter. 
CONSULTATION
Ahead of rent-setting each year, the Council meets
with tenants’ representatives and launches a
consultation to seek views on proposals.  
This year, there were two options for tenants to
consider:
Option 1: This option would maintain the current
level of service. This would mean:
 4%  rent increase (average weekly rent
increase of £3.38)
 Maintaining all current services that tenants
receive including direct support budgets
 Improving performance around voids to
maximise tenant experience and HRA income
 Delivering Capital programme of housing
investment
 Retaining a Tenant Priority Budget of
£800,000 for tenants to direct spend to
improve buildings and wider environment
 Continuation of New Build housing
programme
Option 2: This option would maintain the current
level of service, with an additional £50m of
investment in housing over the next five years to
drive greater improvement. This would mean:
 5% rent increase (average weekly increase of
£4.22)
 Maintaining all current services that tenants
receive including direct support budgets
 Improving performance around voids to
maximise HRA income
 Delivering Capital programme of housing
investment
 Retaining a Tenant Priority Budget of
£800,000 for tenants to direct spend to
improve buildings and wider environment
 Continuation of New Build housing
programme
 Delivering an additional £50m of capital
investment in existing homes over the next 5
years based on tenant priorities – the
preferred programme/s that tenants could
choose from for this option were:
 Programme A – Energy Efficiency Measures
including new heating systems
 Programme B – Kitchen and Bathroom
Renewals
 Programme C – Window/Door Renewal
Programmes
 Programme D – Environmental Works
 Programme E - All Options Above
RENT SETTING
Page 62

Page 63

WEST DUNBARTONSHIRE COUNCIL      
HRA BUDGET & RENT SETTING 
The feedback received through the consultation
provides insight into tenant priorities and is a key
consideration when setting rent. 
It is accepted that the period of consultation
offered this year could have been extended to
increase participation and this will be taking into
consideration for next year’s planning.  
INVESTING £50 MILLION
MORE IN HOUSING 
An increased investment of £50 Million will
achieve:
 Additional new sustainable housing that is
attractive, built to the highest standards and
energy efficient
 More homes to suit the needs of larger
families 
 More homes to address identified medical
needs 
 Better quality homes
 A reactive service for responding to issues like
damp and mould 
 More homes to increase choice and
opportunities for families  
£10 million will be invested in the Council’s buy
back programme over the next five years to
purchase additional housing on the local housing
market to address identified need.
£40 million will be invested to accelerate the
renewal and replacement programmes over the
next five years including:
 Energy efficiency measures like new heating
systems
 Kitchen and Bathroom Renewals
 Window/Door Renewal Programmes
 Programme to eliminate damp and mould
from homes 
The additional investment will result in:
 An additional 100 new council homes (through
buyback scheme)
 Roll out of the Energy Efficiency Programme
making properties cheaper to heat and 
supporting tenants out of fuel poverty
 new heating systems to over 1000 homes per
annum
 Potential delivery of an additional 350 kitchen
replacements per year
 Potential delivery of an additional 280 bathrooms
replacements per year
 Potential delivery of an additional 260 window
and door replacements 
 Enhanced approach to damp and mould issues
 enhancements to the quality of multi storey flats
across West Dunbartonshire
Further consultation will be undertaken to ensure
the views of the WDTRO and the Tenants are
taken into account when investing the £50 million.
IMPROVEMENTS IN LAST SIX
MONTHS
Page 63

Page 64

WEST DUNBARTONSHIRE COUNCIL      
HRA BUDGET & RENT SETTING 
Over the last six months, a range of
improvements have been achieved. These
include:  
 14% Reduction in Voids
 Major Capital Programme Elements
Progressing 
 External Wall Insulation
 Roofs
 Heating
 Kitchens
 Bathrooms
 Adaptations
 Paths
 Queens Quay Completed.
HELP FOR STRUGGLING
FAMILIES
It is clear any increase of rent can be hard on
Tenants especially through the current cost of
living crisis. To support the most disadvantaged
tenants, a fund of £565,000 has been set aside for
direct financial assistance to support tenants over
the course of the next financial year. 
DAMPNESS & MOULD
An enhanced protocol for dealing with referrals
for dampness and mould is under development
and will be presented to the Housing and
Communities committee in May 2023. This will
include a focus on using new technology to detect
dampness and mould in properties and give
tenants more awareness and control over this
issue. Additional funding will allow the
programme to be accelerated. 
MEDICAL NEEDS AND
LARGER FAMILIES
The Council is committed to meeting housing
demand and both the Buy Back Scheme and New
Build Programmes are based on detailed Housing
needs analysis.  This ensures Council housing stock
is reflective of the needs of residents, including
single households, large family homes and homes
for people with a range disabilities or limiting
conditions. 
NEW HOUSING PROGRAMME
We have an ambitious programme to build or
enable development of 2500 new homes in the
next 10 years. As part of this target, over 700
Council homes will be delivered in the next 5
years.
The Council’s programme will be fully net zero as
well as continuing to offer a high standard of
space, materials and design that have been
evidenced in the programme over the last five
years.
Page 64

Page 65

AUDIT COMMITTEE
At a Meeting of the Audit Committee held in the Council Chambers, Clydebank
Town Hall, Clydebank on Wednesday, 9 November 2022 at 10.00 a.m.
Present: Councillors Karen Conaghan, Ian Dickson, Jonathan McColl,
James McElhill, Michelle McGinty, John Millar, Martin Rooney
and Hazel Sorrell and Lay Member Mr Christopher Johnstone.
Attending: Laurence Slavin, Chief Officer – Resources; Angela Wilson,
Chief Officer – Supply, Distribution and Property; Victoria
Rogers, Chief Officer – People and Technology; Julie Slavin,
Chief Finance Officer, HSCP*; Andi Priestman, Shared Service
Manager – Audit and Fraud; Gillian McNeilly, Finance Manager
and Ashley MacIntyre, Committee Officer.
*Arrived later in the meeting.
Also attending: Fiona Mitchell-Knight, Audit Director and Christopher Gardner,
Senior Audit Manager, Audit Scotland.
Councillor Karen Conaghan in the Chair
DECLARATIONS OF INTEREST
It was noted that there no declarations of interest in any of the items of business on
the agenda were made at this point.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Audit Committee held on 10 August 2022 were
submitted and approved as a correct record.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
ITEM 6
Page 65

Page 66

STRATEGIC RISKS 2022-2027 
A report was submitted by the Chief Officer – People and Technology setting out
proposed changes to the strategic risks for 2022-2027 following the Strategic Plan
developments. 
After discussion and having heard the Chief Officer – People and Technology and
relevant officers in further explanation of the report and in answer to Members’
questions, the Committee agreed the strategic risks as detailed in Appendix 1 to the
report. 
Note: Julie Slavin, Chief Finance Officer, HSCP joined the meeting during 
consideration of this item. 
TREASURY MANAGEMENT STRATEGY MID YEAR REPORT 2022/23 
A report was submitted by the Chief Officer – Resources providing an update on
treasury management to 31 August 2022. 
After discussion and having heard the Chief Officer – Resources and the Finance
Manager in further explanation of the report and in answer to Members’ questions,
the Committee agreed:- 
(1) to note the treasury management stewardship information within Appendix 1
to the report; 
(2) to note the 2022/23 revised estimates of treasury and prudential indicators as
detailed in Appendix 1 to the report (Tables A, B, C, D, E, F, H, L and N); and 
(3) to note that the report had been remitted to the Audit Committee from Council
to ensure further scrutiny took place. 
TREASURY MANAGEMENT ANNUAL REPORT 2021/22 
A report was submitted by the Chief Officer – Resources providing an update on
treasury management during 2021/22. 
After discussion and having heard the Finance Manager in further explanation of the
report and in answer to a Member’s questions, the Committee agreed:- 
(1)  to note the information provided within the Annual Report as detailed in 
Appendix 1 to the report; and 
(2)   to note that the report had been remitted to the Audit Committee from Council 
to ensure further scrutiny took place. 
Page 66

Page 67

VALEDICTORY
GILLIAN MCNEILLY, FINANCE MANAGER
Laurence Slavin, Chief Officer – Resources advised that this was the last meeting of
the Audit Committee that Gillian McNeilly, Finance Manager would be attending as
she was leaving Council service before the end of the year. 
On behalf of all Members of the Audit Committee, Councillor Karen Conaghan, Chair
thanked Ms. McNeilly for her years of dedication and wished her well for the future.
Councillor Martin Rooney concurred with Councillor Conaghan’s sentiments thanking
Ms. McNeilly for her hard work and valued support.
In response, Ms. McNeilly thanked everyone for their kind well wishes.
ANNUAL AUDIT REPORT TO MEMBERS AND CONTROLLER OF AUDIT 2021/22
A report was submitted by the Chief Officer – Resources providing the opportunity to
consider the Annual Audit Report to Members and Controller of Audit, for the
Council and the Trusts administered by the Council, prior to approving the Audited
Annual Accounts 2021/22 for both the Council and the Charities administered by
the Council.
After discussion and having heard the Chief Officer – Resources, Audit Director and
Senior Audit Manager, Audit Scotland in further explanation of the report and in
answer to Members’ questions, the Committee agreed:-
(1) to note the information provided within the letter to the Audit Committee in
relation to DR AK Glen and West Dunbartonshire Trust Fund as detailed in
Appendix 1 to the report;
(2) to note the Annual Audit Report to Members and Controller of Audit 2021/22
for the Council and the Charities administered by the Council as detailed in
Appendix 3 to the report; and
(3) to note that the Letter and the Annual Audit Report, together with the Financial
Statements will be reported to Council in December 2022.
AUDITED FINANCIAL STATEMENTS 2021/22
A report was submitted by the Chief Officer – Resources providing the opportunity to
scrutinise and approve the Audited Annual Accounts 2021/22 for both the Council
and the Charities administered by the Council.
After discussion and having heard the Chief Officer – Resources in further
explanation of the report, the Committee agreed:-
Page 67

Page 68

(1) to approve the information provided within the Audited Annual Accounts
2021/2021 – covering the Council and the Charities administered by the
Council as detailed in the appendices to the report; and
(2) to note that the Statements will also be reported to Council in December
2022.
DECLARATIONS OF INTEREST
During consideration of the foregoing item of business and a discussion regarding
overtime, Councillor Jonathan McColl made a declaration of interest noting that a
member of his family was currently a Home Carer within West Dunbartonshire.
INTERNAL AUDIT PLANS 2021/22 AND 2022/23 - PROGRESS TO SEPTEMBER
2022
A report was submitted by the Chief Officer – Resources advising of progress at 30
September 2022 against the Internal Audit Plans for 2021/22 and 2022/23.
After discussion and having heard the Shared Service Manager – Audit and Fraud
and relevant officers in further explanation of the report and in answer to Members’
questions, the Committee agreed to note the contents of the report.
NATIONAL FRAUD INITIATIVE EXERCISE 2020/21
A report was submitted by the Chief Officer – Resources advising of the Audit
Scotland Report “National Fraud Initiative 2020/21” published in August 2022 and
providing an overview of the key messages and recommendations raised in the
report and how these issues were being addressed by the Council.
After discussion and having heard the Shared Service Manager – Audit and Fraud
and Chief Officer – Resources in further explanation of the report and in answer to
Members’ questions, the Committee agreed:-
(1) to note the contents of the report; and
(2) that a further update report would be submitted to the February 2023
Audit Committee outlining the Council’s progress with the 2022-2023
exercise.
The meeting closed at 11:45 a.m.
Page 68

Page 69

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer People and Technology
Council: 29th March 2023
___________________________________________________________________
Subject: Motion Report - contingency arrangements (nuclear incident)
1. Purpose
1.1 To provide an update on the local resilience structures should there be a
nuclear incident at Faslane.
2. Recommendations
2.1 It is recommended that Council note:
• West Dunbartonshire Council’s response structures; and
• Specific Nuclear Incident Planning.
3. Background
3.1 At December Council, a motion from Councillor Bollan was agreed, the terms
of which are set out below:
“Council will be aware of the recent reports of the serious fire on the Vanguard
Nuclear Submarine, which was carrying Trident missiles, while it was in the
North Atlantic.
The fire was tackled by the crew, then the submarine had to surface to expel
toxic fumes.
The incident brings into sharp focus the absolute catastrophe that could have
unfolded had the submarine been lost in the North Atlantic.
This dangerous incident will be of great concern to many local people given the
location of the incident and that the submarine is being taken back to Faslane
Base.
Given the gravity of the situation Council asks the CEO to bring a report to the
next Council meeting detailing what contingency plans the Council has in the
event of a serious Nuclear incident at Faslane, or the surrounding waters, to
support & protect the residents of West Dunbartonshire."
3.2 As outlined above, the Royal Navy vanguard-class nuclear submarine, HMS
Victorious, aborted its’ mission after an on-board fire on Monday 7 November
2022. The vessel's crew responded by dousing the electrical fire. The ship’s
captain declared an emergency as the fire spread quickly forcing
the submarine to surface to expel the toxic fumes.  The vessel was then
commanded to return to base at HMNB Clyde in Faslane, Scotland.
ITEM 8

Page 70

4. Main Issues 
4.1 Response Structures
To ensure the safety and wellbeing of residents within West Dunbartonshire
and the surrounding area, there are well established emergency planning
forums and plans in place to mitigate incidents. 
4.2 The lead officer for resilience for West Dunbartonshire Council is the Chief
Officer People and Technology and this area of work is supported by an
established (since October 2016) shared civil contingencies service (CCS)
which provides a 6 FTE strong team of support officers, including out of hours
standby. The Council has a dedicated Civil Contingencies Officer responsible
for reviewing and updating the Council’s suite of Incident Response
Procedures and relevant plans that would be invoked should the Council be
required to respond to an incident in the local area. There are also trained
Council Incident Officers (CIO), typically senior officers, who would be
deployed to support emergency service partners on-scene, facilitate decision
making and resource co-ordination. 
4.3 In addition, the West of Scotland has six Local Resilience Partnerships
(LRPs), comprising of Category 1 and 2 responders. Category 1 and 2
responders are organisations defined in the Civil Contingencies Act 2004 as
having specific responsibilities enshrined in the legislation.
4.4  Each responder typically has an emergency planning officer (sometimes
called a civil protection officer, civil contingencies officer, or resilience officer)
who is responsible for ensuring their organisation is compliant with the Act
and works closely with other responders. 
4.5 Category 1 responders are known as core responders; they include:
• Local authorities;
• Integrated Joint Boards (from 17th March 2021); 
• Police forces, including the British Transport Police;
• Fire services;
• Ambulance services;
• HM Coastguard;
• NHS hospital trusts, NHS foundation
trusts (and Welsh equivalents), NHS England, Public Health
England, and Public Health Wales;
• Port health authorities; and
• The Environment Agency, the Scottish Environment Protection
Agency (SEPA), and Natural Resources Wales.
4.6 Category 2 responders are key co-operating responders acting in support of
the Category 1 responders. Category 2 responders are mostly utility
companies and transport organisations, such as:
• Electricity distributors and transmitters;
• Gas distributors;

Page 71

• Water and sewerage undertakers; and
• Telephone service providers (fixed and mobile). 
4.7 As highlighted above, the Council and IJB are Category one responders and
therefore legally required to prepare, respond to, and aid recovery from any
major disruption/incident within the local area. The LRP facilitates the
planning and preparation for localised incidents as well as major
emergencies. We work with partners to identify potential risks and produce
plans to prevent and/or mitigate local impacts. 
4.8 In addition, West Dunbartonshire Council have three emergency management
response structures (Appendix 1): 
Resilience Group – This group is a “peacetime” group that meets every
quarter to discuss local incidents, incident response plans/procedures and
emerging/concurrent risks. This group is comprised of service managers who
would typically be involved in incident response due to the nature of their
service. It is chaired by the Resilience Lead, Chief Officer People &
Technology and supported by the Civil Contingencies Officer. 
Strategic Resilience Group – This group, comprising of West
Dunbartonshire Council’s Chief Executive, Chief Officers, Health, and Social
Care Partnership (HSCP) Chief Officer and Heads of Service,
Communications Manager and Civil Contingencies Officer, typically stands up
during a major incident e.g., Covid. However, the group can be called to stand
up if there are specific risks that may have a major impact on the Council
and/or local area. This group drives the strategic priorities that the Council
need to deliver to support the response. This is also chaired by the Resilience
Lead, Chief Officer People & Technology and supported by the Civil
Contingencies Officer. 
Operational Resilience Group (ORG) – This group’s activities flow from the
SRG with tactical actions typically assigned to the Operational Resilience
Group (ORG). This group co-ordinates the Council’s operational response to
a major incident and escalates issues to SRG for consultation and
consideration. 
4.9 Specific Nuclear Incident Planning 
4.10 Locally, the Council have been involved in the consideration of Radiation
Monitoring Units (RMUs) used to determine levels of radioactive
contamination in or on people and any subsequent requirement for
decontamination. This work is being carried out across the West of Scotland
to support Public Health England (PHE) in determining suitable locations. 
4.11 The Council has strong relationships with Civil Contingencies teams across
the LRPs and particularly those in the West LRP and Argyll and Bute ensuring
a joined-up approach to incidents and/or risks that may encroach upon council
boundaries.  As background, as part of the Radiation Emergency

Page 72

Preparedness and Public Information Regulations (REPPIR 2019) and the
Control of Major Accidents Hazards Regulations (COMAH 2015) both Faslane
and Argyll and Bute Council are responsible for testing the on and off-site
emergency plan (typically every three years) to ensure both plans are fit for
purpose. Additionally, Faslane is mandated by REPPIR to carry out a Hazard
Evaluation & Consequence Analysis on a tri-annual basis. 
4.12 It is worth highlighting that, due to the scale of a nuclear attack/incident, this
would constitute a breach of National Security therefore there is a strong
likelihood that the Cabinet Office Briefing Room (CoBR) the UK’s Civil
Contingencies Committee would be convened to support the response
(Appendix 2). 
4.13 West Dunbartonshire Council has a strong and robust emergency planning
regime that is well tested. When incidents occur in the local areas, the
respective structures stand up to ensure the residents of West Dunbartonshire
are looked after and supported accordingly.  There is a strong level of
resilience awareness, planning and preparedness undertaken year on year,
now well embedded in the organisation’s culture. The resilience of the
organisation is strengthened by the relationships with local responders and
agencies which have proved invaluable when dealing with and responding to
incidents. 
4.14 Consequently, reassurance can be taken from the resilience structure within
West Dunbartonshire Council being equipped to manage and respond to a
nuclear incident and indeed any other incident that may pose a threat to West
Dunbartonshire Council. 
5. People Implications 
5.1 There are no people implications associated with this report, other than in
relation to the mitigation of nuclear risk.  
6. Financial and Procurement Implications 
6.1   There are no financial and/or procurement implications directly associated
with this report.  
7. Risk Analysis 
7.1 Failure to appropriately plan and prepare as defined by our responsibilities
under the CCA 2014 would result in the Council being non-compliant, subject
to sanctions and being unable to adequately respond to incidents and events. 
8. Equalities Impact Assessment (EIA) 
8.1 An equalities impact assessment was not required for this report.

Page 73

9. Consultation 
9.1 Argyll and Bute Council and Faslane Naval Base were consulted in the
preparation of this report. The Chief Officers Resources and Regulatory and
Regeneration were also consulted as per usual process. 
10. Strategic Assessment 
10.1 The following priorities are supported by the actions, planning and
preparedness detail in this report:
• Meaningful community engagement with active empowered and informed
citizens who feel safe and engaged.
• Open, accountable, and accessible local government. 
Name:   Victoria Rogers
Designation: Chief Officer People & Technology 
Date:   28th February 2023 
Person to Contact: Jen Watt, Civil Contingencies Officer  
Telephone: 07989 416 772  
Email: Jennifer.watt@renfrewshire.gov.uk 
Appendices: 1. Local Emergency Management Structure  
2. National to Local Resilience Structure 
Background Papers: N/A 
Wards Affected: No wards are affected.

Page 74

Appendix 1 – Emergency Management Structure

Page 75

Appendix 2 – National to Local Structure

Page 76

Page 76

Page 77

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer (Regeneration and Regulatory)
Council: 29 March 2023
Subject: Glasgow City Region City Deal - Update
1. Purpose
1.1 To note the progress with the implementation of the Glasgow City Region
City Deal.
2. Recommendations
2.1 It is recommended that Council notes the progress of the Glasgow City
Region programme.
3. Background
3.1 The Glasgow City Region City Deal Infrastructure programme equates to
£1.13bn of investment during period 2015-2035. Projects are progressing
and have reached various stages from Strategic, Outline and Full Business
Case stages of approval.
3.2 Previous reports, listed in background papers, have reported on progress of
the Council’s City Deal project at the Exxon site.
4. Main Issues
4.1 The Council is progressing the Exxon Project, which includes working with
Balfour Beatty via the Scape Framework as part of the pre-construction
agreement to allow the detailed design elements of the project to commence
and provide greater certainty by June 2023 regarding the budget position. A
number of cost savings have already been identified in the early design
process. In October 2022 Council approved expenditure of £5.74M on design
and construction of the Western Underpass prior to approval of the Full
Business Case, anticipated to be in June 2023. The contract with Network
Rail for the design has now been concluded and regular progress meetings
are taking place. The Stage 2 2023/24 funding application to Scottish
Government for Vacant and Derelict Land Fund was unsuccessful, but
officers intend to resubmit for 2024/25, taking on board any feedback
received.
Glasgow City Region City Deal Update
4.2 The Glasgow City Region Chief Executives Group (CEG) met on 2 February
2023. Agenda items included Electric Vehicle Charging Interim Report; an
update on the Clyde Green Freeport bid; and a report on the proposed
Anchor Network. Regarding the Electric Vehicle Charging Strategy, this
ITEM 9
Page 77

Page 78

includes consideration of introducing tariffs, including potential overstay
charges to encourage fair and sensible use of charge points. The Anchor
Network is being established to share information across anchor
organisations in an effort to progress community wealth building principles
such as Living Wage, procurement and building the capacity of local
businesses.
4.3 CEG noted that the second Strategic Transport Review was published in
December which confirms that a Scottish Government strategic priority will be
Glasgow Metro. The Investment Plan is due to be published early this year,
and will set out funding, delivery mechanisms and timelines for phases of
Metro. The Glasgow Airport Link will be subsumed into Metro proposals. The
Metro team which include reps from Glasgow City Council, Transport
Scotland and Strathclyde Partnership for Transport have been liaising with
UK Infrastructure Bank on investment opportunities in Metro. 
4.4 The Quarterly Performance Report was also presented to CEG Under Key
Highlights, the agreement of a contract with Network Rail for the Western
Underpass on Exxon was noted. The Report also notes some positivity
around economic growth in the Region, albeit limited, in late 2022. There
were details of Gateway Review 2 in that the Department of Levelling Up
Housing and Communities have issued a new framework for evaluating
impact of the City Deal projects since the first Gateway Review five years
ago. Department of Levelling Up Housing and Communities have appointed
consultants SQW to assist. The majority of this work will be done by the City
Region programme management office, but completed projects will be
assessed for their impact. This only affects projects that will be complete by
October 2023.
4.5 Due to escalating construction costs having an impact on the ability to deliver
all the projects across the Region, the City Region programme management
office is working with Chief Executives on a project reprogramming exercise
with the objective of prioritising projects with the most economic impact. The
information will be analysed by the Programme Management Office and a
report will be presented to April Cabinet.
Green Freeport Bid
4.6 The Clyde Green Freeport Bid was unsuccessful, with Freeport status in
Scotland being awarded to Inverness and Cromarty Firth Green Freeport and
Forth Green Freeport by the Scottish and UK governments. 
Shared Prosperity Fund
4.7  A Local Investment Plan has been developed and approved by the UK
Government as part of a wider Glasgow City Region Investment Plan through
the UK Shared Prosperity Fund. The business support proposals within the
Investment Plan will be available from April 2023 to support business
recovery and include a Business Recovery & Growth fund, Early Stage
Growth grants, Towards Net Zero Grant, Enhancing Tourism Events &
Attractions Fund, Business Gateway Expert Help and Shopfront & Small
Business Improvement Grants.
Page 78

Page 79

Clyde Bridge
4.8 The Clyde Bridge Contractor maintains a website with regular updates on the
project. A viewer at the top of the website home page shows a video of
progress which is updated monthly. This can be accessed at:
www.graham.co.uk/clyde-waterfront
4.9  Since the last report the Contractor has made visible progress with works on
site and continued dialogue with key stakeholders and landowners.
Previously agreed accommodation works and boundary fencing along Dock
Street is now complete. Work on the diversion of the Yoker Burn culvert is
progressing with excavation for the new route established and work on
structures on-going. The Contractor is liaising with colleagues regarding the
detailed road design along Dock Street, prior to construction commencing in
this area. Work on the south Pier for the new bridge has commenced.
Fabrication of the bridge structure has commenced off-site.
4.10 The Construction Contract for the Clyde Bridge project requires that
subcontract and supplier opportunities over a value of £10,000 are advertised
through the Public Contracts Scotland Tender portal. This requirement
ensures that as the large-scale project is broken into smaller work parcels,
local companies and SME’s have the opportunity to bid for packages of work.
To date 19 works packages have been advertised, nine awarded, five of
which to companies within the City Region. Additionally, a commitment of a
minimum of 12 days will be spent by the Contractor undertaking supply chain
development, to encourage and coach, local organisations and SME’s how to
prepare to enable access to this and therefore other public sector work
opportunities. Thus far five sessions of training have been held. Also during
the period the Contractor undertook a training day with Working 4U
Dunbartonshire Training Academy staff and clients.   
4.11    Next stages of works include works on the North Pier and layby berth at
Rothesay Dock.
4.12    Newsletters are accessible by those who register for further updates after the
issue of the first newsletter to over 3,500 residents and businesses in the
local area. Posters advising the project website address were also delivered
to public buildings in the project area. A link to register for updates is
contained within the project webpage noted above.
5 People Implications
5.1 There are a number of senior officers involved in the Glasgow City
Region wider programme as identified at City Region Update paper at
Council on 26 August 2021.
Page 79

Page 80

6. Financial Implications
6.1 The approved budget to date for the City Deal Exxon project is £34.5M.
The expenditure during 2021/22 was £0.44M, and as at February 2023
the current expenditure for 2022/23 stands at £0.614M.
7. Risk Analysis
7.1 There are a number of project risks associated with the development at
the ExxonMobil project site and these are contained within the risk
register of the refreshed Outline Business Case and updated by the
project board on a regular basis.
8. Equalities Impact Assessment
8.1 An Equalities Impact Assessment is not necessary for this report as it an
update on a previously reported project.
9. Consultation
9.1 Consultation with all key stakeholders is progressing as we continue
to work as part of the Glasgow City Region.
9.2 Legal Services, Finance, Planning and Procurement are regularly
consulted through their participation in the Exxon project board.
9.3 Wider communication is produced regarding progress of the Glasgow
City Region at its website http://www.glasgowcityregion.co.uk/
10 Strategic Assessment
10.1 At its meeting on 26 October 2022, the Council agreed that one of its
main strategic priorities for the Strategic Plan 2022 - 2027 is:
• A Strong local economy and improved employment opportunities
10.2 The proposals within this report are specifically designed to deliver on
this priority.
Alan Douglas
Chief Officer: Regulation and Regeneration
Date: 6 December 2022
Person to Contact: Gillian McNamara
gillian.mcnamara@west-dunbarton.gov.uk
Appendix: None
Background Papers: UK Shared Prosperity Fund Report to Housing and
Page 80

Page 81

Communities Committee 22 August 2022
GCR Interim Performance Report- 18 Nov 2021 , GCR
Education Improvement Collaborative/West Partnership
Improvement Plan 2021/22, Glasgow City Region City
Deal – 29 Council updates since February 2016, March
2021 Elected Members briefing- Renfrew Bridge, July
2020 Members Bulletin.
ExxonMobil Commercial Agreement 24 June 2020.
Glasgow City Region City Deal - Exxon Site Outline
Business Cases 22 Feb 2017 and 28 Nov 2018
(Refreshed). 
Clyde Valley City Deal - Update and Strategic Business
Case- Council 24 June 2015. 
Clyde Valley City Deal Update- Council 25 Aug 2015 and
16 Dec 2015. 
Clyde Valley City Deal- Governance- Council 17 Dec
2014.  
Glasgow City Region City Deal- Council 13 August 2014.
“City Deal Initiative” Clyde Valley Investment Fund-
Council 30 April 2014 (Memorandum of Understanding).
Clyde Valley Community Planning Partnership – City Deal
Initiative – Council 28 August 2013.
Equalities Impact Assessment November 2018.
Environmental Impact Assessment -DC20/088 – Planning
Application – Documents.
Wards Affected: All
Page 81

Page 82

Page 82

Page 83

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
West Dunbartonshire Council: 29 March 2023
_________________________________________________________________
Subject: Non Domestic Rates Empty Property Relief Policy
1. Purpose
1.1 The purpose of this report is to seek approval of the introduction of West
Dunbartonshire Council’s (the Council) locally agreed Non-Domestic Rates
(NDR) Empty Property Relief (EPR).
2. Recommendations
2.1 Members are asked to:
a) Approve the new West Dunbartonshire Council Empty Property Relief
Policy.
b) Agree that a review of the new Empty Property Relief Policy is carried
out by 31 March 2024 and presented to the Corporate Services
Committee following consultation with internal and external
stakeholders.
3. Background
3.1  NDR is a national rate of non-domestic properties taxation and is
determined each year by the Scottish Parliament.  All local authorities
collect the rates and the monies collected are pooled into a national central
fund.
3.2 Current provisions are that EPR is a mandatory relief provided by the
following provisions and fully funded through the local government
settlement. These are:
• All unoccupied properties (non-industrial) receive 50% relief from non-
domestic rates for the first 3 months they are unoccupied, reducing to a
10% relief thereafter.
• Unoccupied industrial properties are eligible to receive 100% relief from
non-domestic rates for the first 6 months they are unoccupied, reducing to
a 10% discount thereafter.
• 100% relief may be awarded where a property is unoccupied, with no limit
of time, where the following criteria are met:
▪ a listed building
▪ a rateable value under £1,700
ITEM 10
Page 83

Page 84

▪ owned by a trustee for sequestration, liquidation or executors
▪ the owner is a company or partnership being wound up
▪ the owner is in administration (or subject to administration order)
▪ by law, the property cannot be occupied
▪ under a compulsory purchase order
▪ the property has no buildings 
4. Main Issues 
4.1 The Scottish Government in line with the Barclay Review, have devolved
EPR to local authorities from 1 April 2023 to award discretionary local
reliefs.  The view is that devolved EPR allows councils to set out their own
local arrangements to better align the use of the relief in meeting local aims,
strategic priorities. 
4.2 The Council must have an agreed policy to continue to consider and grant
EPR from 1 April 2023, failing which it cannot grant EPR relief from 1 April
2023 onwards to any business or business owner.   
4.3 Reviews of the use and support provided by the Council’s EPR scheme
cannot yet be meaningfully considered for West Dunbartonshire at the point
of introducing the Policy, hence it is not recommended to change the
current provisions as set out in paragraph 3.2 at this time.   
5. People Implications 
5.1 There are no people implications.  
6. Financial and Procurement Implications 
6.1 NDR Empty Property Relief provided by the Council will be funded as a
share of an agreed allocation from £105m grant funding provided by the
Scottish Government for the next three financial years.  There is no
inflationary increase in devolved monies between these years and no
indication at this juncture of considerations at the end of this three year
period. 
6.2  Local Government Revenue Funding will be adjusted to reflect the
devolution of EPR.  The provision awarded to the Council for the year
2023/24 will be announced by the Scottish Government. 
6.3 The Council Policy presented continues to administer the EPR scheme with
the same levels of relief as the current Scottish Government provisions,
using the above funding to reconcile the costs. 
6.4 Whilst there is flexibility to review the scheme and consider different levels
of relief, it is the recommended that such a review is undertaken following
the first year of the new EPR Policy being applied, in consultation with
Ratepayers, Business Support and Regeneration Services. 
Page 84

Page 85

6.5 It is recommended that a review of the new EPR Policy be carried out prior
to 31 March 2024 accompanied by a paper to the Corporate Services
Committee with conclusions from the review and recommendations going
forward.
6.6 For information, West Dunbartonshire Council awarded Empty Property
Relief as follows;
Empty Property Relief No of Accounts Relief Awarded
2020/2021 98 £482,246.71
2021/2022 169 £302,050.66
There are no Procurement implications.
7. Risk Analysis
7.1 The provision for West Dunbartonshire Council Empty Property Relief is
provided within the current forecast planning based on the current
legislative position. However ongoing forward a review of the continuation
of such Empty Property Relief and its categories will be considered via the
annual budget planning.
7.2 Exceptional economic events may cause unexpected impacts on the
number of unoccupied properties or where large properties with high
rateable values become unoccupied.
7.3  Where such a substantial impact on a Council area had a significant
bearing on the settlement agreed councils and COSLA would raise
discussion with the Scottish Government.
7.4 Revaluation is due on 1 April 2023 this is likely to impact the value of the
relief currently allocated to EPR.
8. Equalities Impact Assessment
8.1 No significant issues were identified in a screening for potential equality
impact of this measure.
9. Consultation
9.1 Consultation has taken place with Business Support and there are neither
any issues nor concerns with the proposal.
10. Strategic Assessment
10.1 NDR collection and the value of relief to be applied forms part of the
financial governance of the Council.  Sound financial practice and
budgetary control are imperative to assist with the governance of the
Council and support officers of the Council in achieving the five strategic
priorities. 
Page 85

Page 86

Laurence Slavin
Chief Officer - Resources
Date: 31/01/2023
Person to Contact:  Arun Menon, Business Support Manager, 
Church St, Dumbarton.
Email: arun.menon@west-dunbarton.gov.uk
Appendices: West Dunbartonshire Council Non Domestic Rates
Empty Property Relief Policy
NDR EPR Policy EIA
Background Papers: None
Wards Affected: All Council Wards.
Page 86

Page 87

1
Non Domestic Rates
Empty Property Relief
Policy
APPENDIX 1
Page 87

Page 88

2
Document Management - Version Control
Policy Title NDR – Empty Property Relief Policy
Version
Number & Date 1.0 April 2023
Summary of
Substantive
Changes (if
applicable)
New Policy 
Introduced SG devolved to Councils.
Summary of
Technical
Changes (if
applicable)
Lead Officer Arun Menon - Business Support Manager
Legislative
Reference
Local Government (Financial Provisions etc.)
(Scotland) Act 1962 Section 4(5)
Consultation &
Approval
Process
Committee Date
West Dunbartonshire
Council 29/03/2023
Page 88

Page 89

3
Contents
Section Title Page Number
1 Introduction/Background 4
2 Empty Property Relief 4
3 How to Apply for Empty Property
Relief
4
4 Right of Appeal 6
5 Fraudulent Applications 6
6 Policy Review 6
Page 89

Page 90

4 
1. Introduction/Background 
Non Domestic Rates (NDR) represent charges on the occupancy of lands and heritages in
the Valuation Roll.   NDR Charges are levied in terms of the Local Government (Scotland)
Act 1947 (as amended). 
NDR, often referred to as business rates, are levied on non-domestic properties, subject to
statutory exemptions and reliefs. The NDR framework for Scotland is devolved to the
Scottish Parliament and Scottish Government. 
This document sets out West Dunbartonshire Council’s (the Council) policy per Section 19 of
the Non-Domestic Rates (Scotland) Act 2020.  (Commencement No.3 and Commencement
No.2, Transitional and Saving Provisions) (Amendment) Regulations 2022. 
The cost of Empty Property Relief is funded by the Council based on the settlement and
distribution agreement methodology from Scottish Government. 
2.  Empty Property Relief 
Entitlement to Empty Property rates relief is determined by section 3A of the Local
Government (Financial Provisions etc.) (Scotland) Act 1962 (as inserted by the Community
Empowerment (Scotland) Act 2015) to offer discretionary local reliefs for empty properties. 
The appropriate level of relief that may be applied to any property and organisation meeting
the criteria as set out in the Council’s Empty Property Relief Policy is listed below: 
• All non industrial unoccupied properties are eligible receive 50% relief from non-domestic rates
for the first 3 months they are unoccupied, reducing to a 10% relief thereafter.
• Unoccupied industrial properties are eligible to receive 100% relief from non-domestic rates for
the first 6 months they are unoccupied, reducing to a 10% discount thereafter.
• 100% relief may be awarded where a property is unoccupied, with no limit of time, where the
following criteria are met:
- a listed building 
- a rateable value under £1,700
- owned by a trustee for sequestration, liquidation or executors
- the owner is a company or partnership being wound up
- the owner is in administration (or subject to administration order)
- by law, the property cannot be occupied
- under a compulsory purchase order
- the property has no buildings. 
3. How to Apply for Empty Property Rates Relief 
The Council will require a separate application for each rateable property.  All requests for
rates relief must be made on the relevant online application form and supported by the
appropriate documentation, as applicable, to be eligible for this relief; 
- Listed Building Status Confirmation
- Notice of sequestration, liquidation or executors
- Notice of winding up
- Notice of Administration or subject to administration order
- Notice of restricted occupation, surveyors reports
Page 90

Page 91

5
- Notice of compulsory purchase order
- Relevant maps, photographic evidence
- Removal evidence
Empty Property Relief is granted from the date the property is unoccupied and only
backdated to prior years in exceptional circumstances. Empty Property Relief will be
awarded for a maximum period of 1 year up to the 31 March of the current year and requires
annual applications thereafter.  
The Council will review all ratepayers in receipt of Empty Property Relief at a mid-year point,
normally October, in order for the Council to review and receive appropriate confirmation that
the organisation remains eligible for this relief. 
3.1 Part Occupation
Where the Council determines that part of a property is unoccupied for a short period,
namely six months, it may ask the Assessor to apportion the Rateable Value between the
occupied and unoccupied parts of the property.  
In that case, the Assessor must apportion accordingly and the following applies. The Rateable Value
for the whole property is taken for rating purposes to be the apportioned value of the occupied
portion plus a percentage of the apportioned value of the unoccupied portion. That percentage is:
• 0% for industrial property empty for up to 6 months
• 90% for industrial property empty for over 6 months
• 50% for non-industrial property empty for up to 3 months
• 90% for non-industrial property empty for over 3 months.
This does not entail the Valuation Roll itself being altered, but the apportioned figures supplied to
the Council by the Assessor on request.  Part-occupation is generally considered when a ratepayer
can clearly evidence that part of the property is unoccupied. The start date for Empty Property Relief
is the later of the date part occupation commenced or the start of the financial year in which the
Council’s request was made to the Assessor.  Note there is no provision to allow for prior years
applications.
The end date is the earliest of:
• the end of the part occupation;
• the end of the financial year in which the Council’s request was made to the Assessor; or
• a further apportionment being made; or
• the date property became fully unoccupied.
The Council may extend the duration into the following financial year.
Applications for Empty Property Relief are available online via the Council’s Business
Webpage.
Further assistance can be provided by contacting the Finance Service Centre via email:
rates@west-dunbarton.gov.uk or by telephoning 01389 737737.
Page 91

Page 92

6 
The Council retains the right to inspect all such properties that make declarations on which
Empty Property Relief is being applied. 
4.  Rights of Appeal 
Where an organisation has been refused Empty Property Rates Relief for any reason an
appeal may be heard by a panel from the Council’s Corporate Services Committee made up
of 3 members.   
To submit an appeal this must be made in writing to the Chief Officer of Resources providing
grounds of appeal and any relevant supporting evidence/documentation.   Appeals must be
made within 28 days of receipt of the Council’s final written decision. 
5. Fraudulent Application 
Any applications found to be made fraudulently will result in reliefs being cancelled and
reapportioning all relevant invoices and reissued for immediate payment.  Police Scotland
will be advised alongside all other relevant authorities/bodies. 
6. Policy Review 
A review of the Non Domestic Rates Empty Property Relief Policy will be undertaken in light
of any legislative changes, or other factors that impact the effectiveness of the policy.   
Related Policies 
West Dunbartonshire Council Corporate Debt Policy (Section 5.2)
Page 92

Page 93

APPENDIX 2
Page 93

Page 94

Page 94

Page 95

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Citizen, Culture, & Facilities
West Dunbartonshire Council – 29 March 2023
Subject: Scale of Charges – Clydebank Town Hall
1. Purpose
1.1 This responds to a motion to Council requesting that Officers prepare a
report to allow Elected Members to consider a review of all hire costs
associated with Clydebank Town Hall events and what level of
charitable discount or reduction is appropriate.
2. Recommendations
2.1 It is recommended that Elected Members:
• note the current scale of charges and discount scheme at Clydebank
Town Hall and in addition note the £20,000 fund created as part of the
23/24 budget to support community groups with the hire of Council
venues or facilities for one-off events
• delegate authority to officers to establish a process and criteria for
applications
• delegate authority to the Chief Officer - Citizen, Culture, & Facilities
and/or the Chief Officer – Resources to approve or reject applications to
the fund.
3. Background
3.1 The B-listed Clydebank Town Hall is the Council’s premier events
venue, providing bespoke space for a range of corporate, civic and
cultural events and also hosting museum and gallery space.
3.2 The Town Hall is currently open to the public and regularly staffed from
9am to 5pm Monday to Friday. Events space can be hired seven-days-
a-week until midnight, subject to licensing. The annual cost of operating
the building is circa £417,000 with income significantly impacted by
Covid and at year end anticipated to be around £80,000.
3.3 The service has undergone a restructure which has reduced overall
operating costs from £518,000 in 2020/21 to £417,000 in 2022/23.
Typically bookings for events are received around 12 months in
advance and bookings for wedding are received up to two years in
advance. The extended closure as a result of Covid, has impacted on
bookings for 2022/23 and 23/24 particularly for weddings. The building,
due to its age and size, is costly to run and in order to offset this, it is
ITEM 11
Page 95

Page 96

essential that all bookings are cost effective. 
3.4 Constituted community groups and charities are offered a 25%
discount on room bookings during normal operational hours, 9am to
5pm, Monday to Friday. Local amateur dramatic groups are among
those which benefit from this discount. Groups have also been
signposted to West Dunbartonshire Community and Volunteering
Services for support and have successfully applied for funding for
running costs in previous years. Lower cost room hire rates are
available at venues operated by West Dunbartonshire Leisure, and
free room bookings are on offer at several Council libraries. 
4. Main Issues 
4.1 A motion was passed at Council in September 2022 requesting that a
report be brought forward to enable Elected Members to consider a
review of all hire costs associated with Clydebank Town Hall events
and what level of charitable discount or reduction is appropriate. The
current schedule of charges is included as Appendix 1. 
4.2 As highlighted above, charities and constituted groups utilising the
Town Hall currently receive a 25% discount on room hire rates during
normal operational hours, and in addition some groups have
successfully applied for external funding to offset the costs of venue
hire. 
4.3 Since reopening in 2022/23, the focus has been on implementing the
staffing restructure and recruiting to vacant posts. With staffing in
place, the team is now set to resume implementation of the marketing
plan developed pre-Covid with a wedding show planned for March
2023. A number of bookings have been received for 2024 and the
focus is on restoring booking levels to pre-pandemic levels. 
4.4 The revised staffing model has reduced costs however operational
costs and in particular utility costs remain high. The new leaner
staffing structure ensures efficient delivery during normal operational
hours with the ability to supplement with additional staffing for events
including on evenings and weekends. The type and scale of the event
dictates the staffing numbers but typically for a show in the Grand
Hall with upwards of 200 people, the cost of staffing including
cleaning would be circa £73 an hour with £45 an hour for utilities. 
The current hourly rate for hire of the Grand Hall is £108 per hour and
from 1 April 2023 will be £119. It is difficult in the circumstances and
with the current financial climate to suggest a further discount for
community groups and charities without incurring costs to the
Council. 
4.5 Post pandemic the Council is committed to supporting health and    
wellbeing and it is recognised that a key factor in achieving this is
working with communities and community groups. 
4.6 As part of the 2023/24 budget, a £20,000 wellbeing fund was created
Page 96

Page 97

to support local community groups with the hire of venues and
facilities to stage one-off events in West Dunbartonshire. 
4.7 Officers would under delegated authority consider each application
against set criteria including that the fund would be open to community
groups resident in West Dunbartonshire and providing activities for the
benefit of communities in the area. Each group could apply for funding of
up to £2,000 each to offset costs relating to hall and facility hire for one-
off activities such as shows, festivals and events at Council venues
including Clydebank Town Hall. 
4.8 Groups would outline the details of the event and benefit provided
within the application and would also be required to submit the
quotation for the venue. Each group would be required to confirm
their organisation does not exist to make a profit and would be limited
to one grant per financial year. Applications meeting the criteria would
be granted until the fund was exhausted for that calendar year.
Grants meeting the criteria but submitted after the fund has been
exhausted could be considered in the following financial year.
4.9 Council is asked to delegate authority to the Chief Officer - Citizen,
Culture, & Facilities and/or the Chief Officer – Resources to make the
final decision on whether to approve an application. This will ensure
that applications can be reviewed, approved, or rejected and
payments made within a reasonable timeframe.
4.10 If the report and proposal is approved, officers would look to launch
the fund during April 2023 and this would be advertised through the
Council’s channels.
5. People Implications
5.1 There are no personnel implications from this report.
6. Financial Implications
6.1 The current charging structure ensures costs are met for the building
while also providing local charities and community groups with a discount
during periods when the building requires to be open to support Council
functions including elected member access and business. A £20,000
fund has been created for 23/24 as part of the budget set on 1 March.
Any decision to reduce charges or increase discounts at the Town Hall
would result in additional costs to the Council.
7. Risk Analysis
7.1 The Council has a duty to ensure best value. Failing to ensure a
cost effective charging structure would have a financial impact on
the Council.
8. Equalities Impact Assessment (EIA)
Page 97

Page 98

8.1 An EIA screening has been undertaken and no further action is required.
9. Consultation
9.1 Officers within legal, finance and communications have been
consulted in the development of this report.
10. Strategic Assessment
10.1 The report reflects the 2022 -27 Strategic Plan and in particular the
following Strategic Priorities:
• Our Communities - Resilient and Thriving
• Our Council - Inclusive and Adaptable
Amanda Graham
Chief Officer - CCF
3 March 2023
Person to Contact: Amanda Graham
Chief Officer - CCF 
Email: amanda.graham@west-dunbarton.gov.uk
Appendices: Appendix 1: Charging structure
Background Papers: N/A
Wards Affected: All Wards
Page 98

Page 99

Pricing & Packages
Until 1st April 2023
Corporate Room Hire – Hourly 
Charity 25%  Discount if booked Mon-Fri  9-5
Cost
Sunday Hire £45 additional per hour
Grand hall £108.00
Reception Hall  £85.00
Ceremony Room £65.00
Garden Gallery  £85.00
Clyde Room  £36.00
Changing Rooms £44.00
From 1st April 2023 -  31st March 2024
Corporate Room Hire – Hourly 
Charity 25%  Discount if booked Mon-Fri  9-5
Cost
Sunday Hire £45 additional per hour
Grand hall £118.00
Reception Hall  £93.00
Ceremony Room £70.00
Garden Gallery  £93.00
Clyde Room  £39.00
Changing Rooms £48.00
APPENDIX 1
Page 99

Page 100

Page 100

Page 101

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Council: 29 March 2023
___________________________________________________________________
Subject: Treasury Management Strategy and Annual Investment Strategy
1. Purpose
1.1  The purpose of this report is to seek Council approval of the proposed Treasury
Management Strategy Statement and Annual Investment Strategy and the
indicators contained within.
2. Recommendations
2.1 Council is requested to:
(a) Approve the proposed Treasury Management Strategy Statement and Annual
Investment Strategy and the indicators contained within
(b) Approve the continued use of the asset life method (using either annuity or
equal instalment) for the repayment of loan fund advances with the exception of
spend to save schemes where the funding/income profile method could be
used.
(c) Approve the ability to continue to use countries with a sovereign rating of AA-
and above.
(d) Note the report will be referred to Audit Committee for further scrutiny.
3. Background
3.1 The Council has adopted the Chartered Institute of Public Finance and
Accountancy (CIPFA) Code of Practice on Treasury Management in Local
Authorities. A requirement of the Code is for an annual Treasury Management
Strategy Statement and Investment Strategy to be approved by Council for
the forthcoming financial year. This report seeks Member’s approval of the
proposed Treasury Management Strategy Statement and Annual Investment
Strategy. The report also sets out the policy for the repayment of loans fund
advances for 2023/24.
3.2 The Council uses Link Treasury Services as its external treasury
management advisors. The Council recognises that there is value in
employing external providers of treasury management services in order to
acquire access to specialist skills and resources. The Council will ensure that
the terms of their appointment and the methods by which their value will be
assessed are properly agreed and documented, and subject to regular review.
ITEM 12
Page 101

Page 102

3.3 Appendix 1 and 2 of the attached document outlines the Council’s Capital
Prudential and Treasury Indicators which Members are asked to approve as
required by the Local Government (Scotland) Act 1973 (extended via the
Code on the Investments of Money by Scottish Local Authorities (issued on 1
April 2010) under section 40 of the Local Government in Scotland Act 2003.    
3.4 In 2016 new regulations were enacted by the Scottish Parliament, the Local
Authority (Capital Finance and Accounting) (Scotland) Regulations 2016,
under which the Council is required to set out its policy for the statutory
repayment of loans fund advances prior to the start of the financial year as
detailed in section 3 of Appendix 1. The policy on repayment of loans fund
advances in respect of capital expenditure by the Council is to ensure that the
Council makes a prudent provision each year to pay off an element of the
accumulated loans fund advances made in previous financial years. 
.
3.7 The CIPFA Treasury Management Code of Practice requires greater Member
scrutiny of the treasury polices, increased Member training and awareness and
greater frequency of information. One of the key clauses is that a responsible body
is required to ensure effective scrutiny of the treasury management strategy and
polices.  Within West Dunbartonshire Council the body identified to fulfil this role is
the Audit Committee. Therefore the proposed Treasury Management Strategy
Statement and Annual Investment Strategy and the indicators contained within
should be referred to the Audit Committee once approved by Council to ensure
further scrutiny takes place. 
4. Main Issues
4.1 The Local Government in Scotland Act 2003 requires Council to adopt the
CIPFA Prudential Code and to produce prudential indicators.   Appendix 6 of
this report details the Council’s expected year end indicators for 2023/24,
revises the indicators for 2024/25 to 2026/27 and projects the indicators to
2033/34, with those for the period 2026/27 to 2032/33 being indicative at this
time.
4.2 Within this overall prudential framework there is a clear impact on the
Council’s treasury management activity, either through borrowing or
investment activity.  As a consequence the treasury management strategy
(which includes details of both debt and investment) for 2023/24 to 2032/33 is
included in Appendix 6 (with the period 2026/27 to 2032/33 being indicative at
this time) to complement the prudential indicators relating to the treasury
activity.
4.3 Details of the risks, mitigating controls and limits associated with each of the
permitted investment categories are shown in Appendix 3.  Credit rating type
and definitions are attached as Appendix 4 and a list of approved sovereign
countries for investments are attached as Appendix 5. 
Changes to Financial Regulations - Leasing
Page 102

Page 103

4.4 The Treasury Management Strategy report to Council in March 2021 reported
a change to financial regulations regarding leasing. The change was
postponed and is now due to be implemented on 1 April 2024.
4.5 This change brings the assets and future liabilities for all leases onto the
Council’s Balance Sheet from 1 April 2024. The effect of this change will
increase the ‘level of debt’ identified by the Council; the Capital Financing
Requirement; Operational Boundary; and Authorised Limit, by the future
liability of the leased assets. Forecast and estimates of the ratio of financing
costs to Net Revenue Stream may also be affected in future years. This
change affects all councils, though this Council has a low number of leased
assets.
Capital Strategy
4.6 For information, in December 2017, CIPFA issued a revised Prudential Code.
As a result, from 2019/20, all local authorities were required to prepare a
Capital Strategy report, which is intended to provide the following: 
• a high-level overview of how capital expenditure, capital financing and treasury
management activity contribute to the provision of services
• an overview of how the associated risk is managed
• the implications for future financial sustainability.
4.6.1 The aim of the Capital Strategy report is to ensure that all elected members
fully understand the overall strategy, governance procedures and risk appetite
entailed by the Strategy.
4.6.2 The Capital Strategy for 2023/24 (reported to, and approved by, Council on 1
March 2023) includes capital expenditure, investments and liabilities and
treasury management in sufficient detail to allow all Members to understand
how stewardship, value for money, prudence, sustainability and affordability
will be secured.
5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications arising from this report.
7. Financial and Procurement Implications
7.1 The prudential indicators detailed in Appendix 6 show the Council’s likely and
indicative capital financing for the period 2023/24 to 2032/33 while the
treasury management indicators detailed in Appendix 6 show the likely
borrowing requirement for the same period.
Page 103

Page 104

7.2 Table E in Appendix 6 indicates that in each year the gross borrowing
requirement (which includes short term borrowing for cashflow purposes) is
below the capital financing requirement and does not exceed the total of the
CFR in the preceding year plus the estimates of any additional CFR for
2023/24 and following two financial years (Appendix 2 – section 2.1 and 2.2).
7.3 As a key indicator of prudence this illustrates that the Council only undertakes
long term borrowing for capital purposes and that over the last few years
investment balances have been utilised to fund capital expenditure due to the
concerns over the general economic environment and restricted counterparty
lists.
7.4 There are no procurement issues arising from this report.
8. Risk Analysis
8.1 There are three main risks associated with the formulation of prudential
indicators and the treasury management strategy as detailed in Appendix 1
and 2:
(a) Capital receipts which affect the capital financing and borrowing requirement
may not materialise and if this occurs then additional borrowing will be
required in order to fund the financing requirement;
(b) The risk of Counterparties default (i.e. loss of principal sum invested) must
also be taken into account; however the robust controls included within the
investment strategy (Appendix 2 – section 6) will assist in mitigating this risk;
and
(c) Capital inflation may increase capital expenditure levels, which in turn may
affect the capital financing and borrowing requirement leading to an increase
in borrowing, assuming no additional capital receipts are available.
9. Equalities Impact Assessment
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 Legal and Resources have been consulted in relation to this report and
appendices.
12. Strategic Assessment
Page 104

Page 105

12.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the 5 strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council.
Laurence Slavin
Chief Officer - Resources
Date:   29 March 2023
Person to Contact: Jackie Thomson Church Street, Dumbarton
Email: Jackie.NicholThomson@west-dunbarton.gov.uk
Appendices: 1 Prudential Indicators 2023/24 to 2032/33
2 Treasury Management Strategy 2023/24 to 
2032/33
3 West Dunbartonshire Council and Common Good
Funds Permitted Investments, Associated Controls
and Limits
4 Counterparty Rating Explanations
5 Approved Countries for Investment
6 Prudential and Treasury Indicators
Background Papers: 2023/24 Budget Report – Council 1 March 2023
Review of Capital Programme – Council 21 December
2022
Treasury Management Strategy – Council March 2022
Treasury Mid-year update – Council 26 October 2022
Wards Affected: All wards affected.
Page 105

Page 106

Appendix 1
Capital Prudential Indicators 2022/23 to 2032/33
1. Capital Expenditure and Financing
1.1 This prudential indicator is a summary of the Council’s capital expenditure plans, both those
agreed previously, and those forming part of the 2023/24 budget setting. The Council’s gross
capital expenditure plans are summarised in Table A within Appendix 6. This forms the first of
the prudential indicators.  Total expenditure is partially funded by resources such as capital
receipts, capital grants, etc.  Any remaining expenditure which cannot be immediately funded
from other resources will form a borrowing need.
1.2 A certain level of capital expenditure will be supported by the general capital grant provided by
the Scottish Government, and also specific capital grants from the Scottish and UK
Governments. Anything above this level will be funded from the Council’s own resources (e.g.
other grants, capital receipts, prudential borrowing).
1.3 There are two main limiting factors which may impact on the Council’s ability to undertake
unsupported capital expenditure:
• Whether the revenue resource is available to support the implications of capital
expenditure (borrowing costs and running costs).
• The Government may use a control to limit either the total of all councils’ plans nationally,
or in the event of an assessment by central government that local plans are unaffordable
at a specific council, it may implement a local control.  No such control has been
implemented since the inception of the prudential code, however, HM Treasury keep this
under review.
1.4 The summary of capital expenditure, as per the capital plan reported to Council on 1 March
2023 for both HRA and General Services, is shown in table A in Appendix 6.  The HRA capital
plan refresh extends to 2027/28 with the period from 2027/28 to 2032/33 extracted from the
HRA Business Plan for the purposes of Prudential Indicator calculations.
1.5 Under section 22 of Schedule 3 of the Local Government (Scotland) Act 1975 a local authority
may establish a capital fund to be used for “defraying any expenditure of the authority to which
capital is properly applicable, or in providing money for repayment of the principal of loans (but
not any payment of interest on loans)”.  Furthermore paragraph 24 of Finance Circular 7/2018
confirms that capital receipts may also be used to “fund the cost of premiums, either as they
are incurred, or as they are recharged back to the General Fund/ HRA” 
1.6 The capital plan update for General Services reported to Council assumes an element of
capital receipts is used to fund the principal element of loan charges and annual premium
costs between 2022/23 and 2025/26. This has been adjusted for within these indicators,
where appropriate.
2. The Council’s Borrowing Need (the Capital Financing Requirement)
2.1 The second prudential indicator is the Council’s Capital Financing Requirement (CFR).  The
CFR is simply the total outstanding capital expenditure which has not yet been paid for from
either revenue or capital resources.  It is a measure of the Council’s underlying borrowing
Page 106

Page 107

need.  The net capital financing need (as indicated in Table A in Appendix 6) impacts directly
on the CFR.  
2.2 Due to accounting requirements, the CFR currently includes any other long term liabilities (i.e.
PPP schemes, finance leases) brought onto the Balance Sheet.  Whilst this increases the
CFR, and therefore the Council’s borrowing requirement, these types of scheme include a
borrowing facility and so the Council is not required to separately borrow for these schemes. 
The Council currently has circa £100m for PPP schemes within the CFR. From 1 April 2024,
further accounting changes see operational leases (where the Council is lessee) also being
brought onto Balance Sheet, which will further increase CFR through other long term liabilities
(value to be confirmed, however an estimate has been included within the appendices).
2.3 The CFR projections for both General Services and HRA are shown in table B in Appendix 6
and show that the CFR for the HRA is projected to increase each year from 2022/23 to
2032/33 with the CFR for General Services being anticipated to increase each year until
2025/26, due to the levels of projected capital spend in comparison to income anticipated in
that year.
2.4 The expected impact of the capital expenditure decisions above on the Council’s debt and
investment position are shown in the treasury strategy (Appendix 2).
3. Statutory repayment of loans fund advances
3.1 The Council is required to set out its policy for the statutory repayment of loans fund advances
prior to the start of the financial year. The repayment of loans fund advances ensures the
Council makes a prudent provision each year to pay off an element of the accumulated loans
fund advances made in previous financial years.  
3.2 A variety of options are provided to councils so long as a prudent provision is made each year
as detailed below:
Option Method Detail
1 Statutory Loans fund advances will be repaid by the annuity
method.  The Council was permitted to use this option
for a transitional period only, of five years until 31 March
2021, at which time it was required to change its policy
to use alternative approaches based on depreciation,
asset life periods or a funding/income profile as detailed
below.
2 Depreciation Annual repayment of loans fund advances will follow
standard depreciation accounting procedures.
3 Asset Life Loans fund advances will be repaid with reference to the
life of an asset using either the equal instalment or
annuity method.
4 Funding/ Income
Profile
Loans fund advances will be repaid by reference to an
associated income stream
3.3 Council is recommended to approve the following policy for loans fund advances:
• For loans fund advances made before 1 April 2016, advances will be repaid by the annuity
method, by the appropriate write off period (based upon useful asset lives, following the
agreed Council policy).
Page 107

Page 108

• Recognising that the Council had forward capital expenditure plans and was already
committed to that plan and the revenue implications of that plan, the policy for loans fund
advances made from 1 April 2016 to 31 March 2021 was to mainly repay loans fund
advances by the annuity method (with a write off period based upon useful asset lives)
unless an alternative method is more appropriate.
• For loans fund advances made after 1 April 2021 (i.e. commencing 2021/22), the policy for
the repayment of loans advances is to apply the following options, selecting the most
suitable method for each individual advance.
o Asset life method – loans fund advances will be repaid with reference
to the life of an asset using either the equal instalment or annuity
method.  It is likely that the equal instalment method will be used.
o Funding / Income profile method – loans fund advances will be repaid
by reference to an associated income stream.
3.4 The annuity rate applied to the loans fund repayments is based on historic interest
rates and is currently 9%.
3.5 Table C in Appendix 6 details the loans fund repayment profile for 2022/23 onwards
based on the balance outstanding at 1 April 2022 and capital expenditure plans
2022/23 to 2032/33 as per Table A.  
4. Affordability Prudential Indicators
4.1 The previous sections cover the overall capital and control of borrowing, but within this
framework prudential indicators are required to assess the affordability of the capital
investment plans.   These indicate the impact of the capital investment plans on the overall
Council’s finances.  The Council is asked to approve the following indicators:
4.2 Actual and Estimates of the ratio of financing costs to net revenue stream.  This indicator is
detailed in Table D in Appendix 6, and identifies the trend in financing cost of capital (loan
charges and long term liability financing) against the net revenue stream (funding sources e.g.
Scottish Government revenue support grant, council tax and HRA rental income).  
The estimates of financing costs include current commitments and the impact of capital
expenditure as per Table A and this indicator shows the percentage of total council revenue
expenditure that is spent on repayment of loan charges and long term liability capital and
interest repayments. 
5. Financial reporting changes in relation to leases
5.1 From 1 April 2024 there is a significant change to the Accounting Code of Practice
which the Council follows for their Financial Statements, which will impact on debt
levels and prudential indicators in the future. This change is in relation to assets the
Council leases in.
5.2 Currently there are two types of leases which are treated differently through the
Financial Statements. From April 2024, all leases (where the Council is lessee and
with a few exceptions) will require to be accounted for on the Council Balance Sheet
as assets. For illustrative purposes, leases currently held by the Council (but not
owned and therefore not currently on the Council’s Balance Sheet) include leases for
properties (such as Aurora/ Clydebank Town Centre Office/ Bridge Street),
Page 108

Page 109

photocopiers, and vehicles. The treatment of these leases will become similar to the
current accounting reporting for PPP assets.
5.3 Accounting for these leases on the Balance Sheet will result in increases to assets and long
term liabilities, affecting a number of the prudential and treasury management indicators –
increasing: the ‘level of debt’ identified by the Council; the Capital Financing Requirement;
Operational Boundary; and Authorised Limit, by the value of the leases. Forecast and
estimates of the ratio of financing costs to Net Revenue Stream may also be affected. 
5.4 Currently an exercise is underway to identify all leases and values for both the assets and the
liabilities. No alterations to deal with bringing currently off-balance sheet leased assets onto
the balance sheet have been made within the report as it is currently not required. However,
this will be a requirement for closing of the accounts for 2024/25 and future updates to the
Treasury Strategy (including the mid-year). This will include Capital Financing Requirement,
External debt (Other long-term liabilities), authorised limit and operational boundary, to allow
for those leases which were previously off balance sheet, being brought onto the balance
sheet.
Page 109

Page 110

Appendix 2
Treasury Management Strategy 2023/24 – 2032/33
1. Background
1.1 The treasury management service is an important part of the overall financial management of
the Council’s affairs.  Whilst the prudential indicators in Appendix 1 consider the affordability
and impact of capital expenditure decisions, the treasury service covers the effective funding
of these decisions.  There are specific treasury prudential indicators included in this strategy
which need approval.
1.2 The Council’s treasury activities are strictly regulated by statutory requirements and a
professional code of practice (the CIPFA Code of Practice on Treasury Management).
1.3 As a requirement of the Code Council is required to adopt a Treasury Management Policy
Statement and four Treasury Management clauses.  These form part of the Council’s financial
regulations and the following documents were adopted on 5 March 2018:
• Treasury Management Policy Statement
• Treasury Management Clauses
• The Treasury Management Role of the Section 95 Officer
1.4 The policy requires an annual strategy to be reported to Council outlining the expected
treasury activity for the forthcoming three years, however in line with the longer capital
planning process treasury management indicators have been provided (where appropriate)
covering the period to 2032/33.  A key requirement of this report is to explain both the risks,
and the management of the risks, associated with the treasury service.  Further reports are
issued as follows:
• Mid-year monitoring report on actual activity during the year including revised indicators
where appropriate.
• Year-end report on actual activity for the previous year.
1.5 This strategy covers:
• The Council’s debt and investment projections
• Limits to the Council’s borrowing activity
• The economic climate and expected movement in interest rates
• The Council’s borrowing, debt and investment strategies
• Treasury performance indicators
• Specific limits on treasury activities
• Policy on ethical investments.
2. The Council’s debt and investment projections
2.1 The Council’s forecast treasury portfolio position at 31 March 2023 with forward projections
are summarised in Table E in Appendix 6 and shows the gross debt (the treasury
management operations), against the underlying capital borrowing need (the Capital
Financing Requirement - CFR), highlighting any under or over borrowing.  
2.2 Within the prudential indicators there are a number of key indicators to ensure the Council
operates its activities within well defined limits.  One of these is that the Council needs to
Page 110

Page 111

ensure that its gross debt does not, except in the short term, exceed the total of the CFR in the
preceding year plus the estimates of any additional CFR within the following two financial
years.  This allows some flexibility for limited early borrowing for future years, but ensures that
borrowing is not undertaken for revenue purposes.  This is illustrated by comparing the
estimated gross debt as at 31 March 2023 with the CFR as at 31 March 2026.
2.3 The Section 95 Officer (Chief Officer - Resources) reports that the Council has
complied with this prudential indicator, and no difficulties are envisaged for the current
or future years.  This view takes into account the capital plan refresh reports for General
Services and HRA.
3. Limits to Borrowing Activity
3.1 The Operational Boundary is detailed in Table F in Appendix 6 and is the limit beyond which
external debt is not normally expected to exceed.  In most cases, this would be a similar figure
to the CFR, but may be lower or higher depending on the levels of actual debt.  
3.2 The Authorised Limit for External Borrowing – This is a key prudential indicator and
represents a control on the maximum level of borrowing. This represents a legal limit beyond
which external debt is not allowed to exceed.  This needs to be set or revised by Members.  It
reflects the level of external debt which, while not desired, could be afforded in the short term,
but is not sustainable in the longer term.  This is the statutory limit (Affordable Capital
Expenditure Limit) determined under section 35(1) of the Local Government in Scotland Act
2003. The Government retains an option to control either the total of all councils’ plans, or
those of a specific council, although this power has not yet been exercised.  The Council is
asked to approve the authorised limit detailed in Table G in Appendix 6. 
3.3 Policy on borrowing in advance of need - This Council will not borrow more than or earlier
than required purely in order to profit from the investment return of the extra sums borrowed. 
Any decision to borrow in advance will be within forward approved Capital Financing
Requirement estimates, and will be considered carefully to ensure that value for money can
be demonstrated and that the Council can ensure the security of such funds. Risks associated
with any borrowing in advance activity will be subject to prior appraisal and subsequent
reporting through the mid-year or annual reporting mechanism.
4. UK, World and Scottish Economy Update (January 2023) – Extraction from Link
Treasury Advisor Reports and the Scottish Fiscal Commission Forecast.
4.1 UK
The contraction of GDP in the 3rd quarter of 2022 left it below its 4th quarter 2019 pre-
virus level and the UK lagging behind its major counterparties which have all risen
above pre-pandemic levels. Analysists expect the UK to be the only G7 economy that
is still smaller than before the pandemic by the end of 2024. Household indicators
show that households are increasingly feeling the effects of high inflation and high
interest rates. Inflation indicators suggest the weaker economy has yet to put a dent in
business price expectations
4.2    US
There is mounting evidence that inflation will continue to fall sharply in 2023. Although
the economy appears to have held up in the 4th quarter, most leading indicators
support analysists views that a recession is on its way, which will help to reduce
Page 111

Page 112

inflationary pressures further. Forecasters still expect interest rates to be falling again
by late 2023.
4.3    EU
There has been further slight improvement for prospects in the EU in recent weeks.
Business surveys suggest that activity is no longer contracting sharply, headline
inflation appears to be passed its peak and wholesale gas prices have plunged.
However despite the economy growing the near term outlook is still poor, not least
because of the impact of the tighter monetary policy Core inflation rose in December
2022 and looks likely to stay well above 2% this year, perhaps to a peak of 3.5% as
priced by financial markets.
4.4    China
In China, it is three years since a cluster of cases of severe pneumonia started to draw
attention in Wuhan. Forecasters had analysed economic developments in China since
the outbreak a year ago, which suggested that China’s economy was not much smaller
than it would have been had the pre pandemic growth rate continued. But after a bad
year a gap has opened up. The official GDP figures for last quarter are likely to show
that the ecomony is about 7% smaller than it would have been had the previous
growth rate continued. Analysts suggest that industry has grown slightly faster over the
three years of the pandemic than it did in the three years before. However, the service
sectors has retreated, not relative to its pre pandemic growth trend, but in absolute
terms too.
4.5    Scotland Specific 
The near-term outlook for the Scottish economy has weakened significantly over the
course of the year. The rise in energy and traded goods prices being driven by the
conflict in Ukraine has been greater than expected earlier in the year, pushing up
inflation. Interest rates have risen to levels not seen since before the 2008-09 Global
Financial Crisis. All of this has intensified the costs for households and businesses.
Falling real incomes mean the coming years are going to be difficult for many
households, particularly those with lower incomes.
The underlying structure of the Scottish economy is undergoing profound shifts. The
pandemic has resulted in shifts in demand and changes in labour markets including
more people working from home, while some people are suffering from prolonged
health effects, in part due to delays in NHS treatment. 
Judgement is that Scotland has already entered a recession which will last six
quarters, however the precise magnitude and duration of the recession are uncertain. 
4.6    World Outlook
Global growth is projected to fall from an estimated 3.4 percent in 2022 to 2.9 percent
in 2023, then rise to 3.1 percent in 2024. The rise in central bank rates to fight inflation
and Russia’s war in Ukraine continue to weigh on economic activity. The rapid spread
of COVID-19 in China dampened growth in 2022, but the reopening has paved the
way for a faster-than-expected recovery. Global inflation is expected to fall from 8.8
Page 112

Page 113

percent in 2022 to 6.6 percent in 2023 and 4.3 percent in 2024, still above pre-
pandemic (2017–19) levels of about 3.5 percent.
The balance of risks remains tilted to the downside. On the upside, a stronger boost from
pent-up demand in numerous economies or a faster fall in inflation are plausible. On the
downside, severe health outcomes in China could hold back the recovery, Russia’s war
in Ukraine could escalate, and tighter global financing costs could worsen debt distress.
Financial markets could also suddenly reprice in response to adverse inflation news,
while further geopolitical fragmentation could hamper economic progress.
5. Prospect for Interest Rates
5.1 The Council has appointed Link Asset Services as its treasury advisor and part of their service
is to assist the Council to formulate a view on interest rates. Table H in Appendix 6 gives the
current Link Asset Services central view. 
6. Borrowing and Debt Strategy 2023/24 – 2032/33
6.1 Table E in Appendix 6 forecasts that the capital borrowing need (the Capital Financing
Requirement) will be almost fully funded with external borrowing which is a mixture of
short term and long term debt.
6.2 Against this background and the risk within the economic forecast, caution will be
adopted with the 2023/24 treasury operations.  The Section 95 Officer will monitor
interest rates in financial markets and adopt a pragmatic approach to changing
circumstances. 
6.3 If it was felt that there was a significant risk of fall in long and short term rates, e.g. due
to a marked increase of risks around recession or of risks of deflation, then long term
borrowing will be postponed, and potential rescheduling from fixed rate funding into
short term borrowing will be considered.
6.4 If it was felt that there was a significant risk of a much sharper rise in long and short
term rates than that currently forecast, perhaps arising from a greater than expected
increase in world economic activity or further increases in inflation risks, then the
portfolio position will be re-appraised with the likely action that fixed rate funding will be
drawn whilst interest rates were still relatively cheap. 
6.5 Any decisions will be reported to Members via the Members Bulletin at the next available
opportunity.
6.6 Approved sources of long and short term borrowing include:
Fixed Variable
PWLB X X
Local Authorities X X
Banks X X
Pension Funds X X
Insurance Companies X X
Market – long term X X
Market – short term X X
Market – LOBOs X X
Overdraft X X
Page 113

Page 114

Internal (capital receipts / revenue balances) X X
Finance Leases X X
7. Investment Strategy
7.1 The Council’s investment policy has regard to the Local Government Investment (Scotland)
Regulations (and accompanying finance circular).  Council has also adopted both the
Treasury Management Code of Practice and the Prudential Code and is required to adopt
revised editions.  The day to day investment policies and practices are contained in the
Council’s Treasury Management Practices, which reflect the requirements of these codes.
7.2 Key Objectives – Following the economic background above, the current investment climate
has one over-riding risk consideration - counterparty security risk.  As a result of these
underlying concerns, officers have implemented an operational investment strategy which
prioritises security first, liquidity second and then return. 
7.2.1 The Council has adopted a prudent approach to managing risk and defines its risk appetite by
the following means:
• Minimum acceptable credit criteria are applied in order to generate a list of highly
creditworthy counterparties. This also enables diversification and thus avoidance of
concentration risk. The key ratings used to monitor counterparties are the short term and
long-term ratings.
• Other information: ratings will not be the sole determinant of the quality of an institution; it is
important to continually assess and monitor the financial sector on both a micro and macro
basis and in relation to the economic and political environments in which institutions
operate. The assessment will also take account of information that reflects the opinion of the
markets. To achieve this consideration the Council will engage with its advisors to maintain
a monitor on market pricing such as “credit default swaps” and overlay that information on
top of the credit ratings.
• Other information sources used will include the financial press, share price and other such
information pertaining to the financial sector in order to establish the most robust scrutiny
process on the suitability of potential investment counterparties.
• The Council has defined the list of types of investment instruments that the treasury
management team are authorised to use.
• Transaction limits are set for each type of investment.
• All investments will be denominated in sterling.
7.2.2 The aim of the strategy is to generate a list of highly creditworthy counterparties which will
enable diversification, and thus avoidance of concentration, with the prime intention of
providing security of investment and minimisation of risk.
7.3 Investment Strategy – The process for investment strategy under the regulations covers a
wide range of Council investments and will be broadly managed in the following way:
• Short Term Cash – Cash relating to day to day cash flow will be maintained on a shorter
term basis in cash type products with consideration to  liquidity requirements.
Page 114

Page 115

• Longer Term Cash – Cash relating to reserves, provisions and balances on the balance
sheet may be held for longer periods of time in cash type products or in longer term bonds
or funds depending on:
▪ cash flow requirements
▪ the underlying expectation for interest rates
▪ the economic background of these investments may be held longer term.
• Service Type Investments – These will predominantly be policy driven and approved by
Members.  Shareholdings, development opportunities, loans to third parties, equity
instruments and investment properties held for rental returns will be regularly reviewed to
judge the investment performance.
• Non Service Type Investments – Investments such as Joint venture delivery companies
such as Hub West Scotland and investments in regeneration partnerships and development
opportunities.
7.4 Benchmarking and Monitoring Security, Liquidity and Yield in the Investment Service
A development for Member reporting is the consideration and approval of security, liquidity
and discreet benchmarks.  Yield benchmarks are currently widely used to assess investment
performance.  
7.4.1 These benchmarks are targets (not limits) and so may be breached from time to time,
depending on movements in interest rates and counterparty criteria.  The purpose of the
benchmark is that officers will monitor the current and trend position and amend the
operational strategy depending on any changes.  Any breach of the benchmarks will be
reported, with supporting reasons in the Mid-Year or Annual Report.
7.4.2 In the context of benchmarking, assessing security is a very subjective area to assess.
Security is currently evidenced by the application of minimum quality criteria to investment
counterparties, primarily through the use of credit ratings supplied by the three main credit
rating agencies (Fitch/ Moody’s and Standard and Poors).  Whilst this approach embodies
security considerations, benchmarking levels of risk is more problematic.  One method to
benchmark security risk is to assess the historic level of default against the minimum criteria
used in the Council’s investment strategy.  Table I in Appendix 6 shows average defaults for
differing periods of investment grade products for each Fitch/ Moody’s Standard and Poors
long term rating category.  
7.4.3 The Council’s minimum long term rating criteria is currently “A-”, meaning the average
expectation of default for a one year investment in a counterparty with a “A” long term rating
would be 0.05% of the total investment (e.g. for a £1m investment the average loss would be
£500).  This is only an average - any specific counterparty loss is likely to be higher - but
these figures do act as a proxy benchmark for risk across the portfolio. 
7.4.4 As required by the CIPFA Treasury Management Code of Practice The Council will “ensure
that it has adequate, though not excessive, cash resources, borrowing arrangements,
overdrafts or standby facilities to enable it at all times to have the level of funds available to it
which are necessary for the achievement of its business/service objectives”.  In respect to
liquidity as defined above the Council seeks to maintain:
• Bank overdraft - £1m
• Liquid short term deposits of at least £5m available on an overnight basis.
Page 115

Page 116

7.4.5 Local measures of yield investment benchmarks that will be used to assess returns are:
Benchmark Benchmark
Return
Average
Return
Compound 12 month SONIA* 1.04% 1.12%
Council’s Instant Access Account 1.09% 1.12%
* SONIA is Sterling Overnight Index Average and has replaced LIBOR & LIBID
7.5  Council Permitted Investments – The Investments Regulations (Code on the Investment of
Money by Scottish Local Authorities) requires Council approval of all the types of investment
to be used and set appropriate limits for the amount that can be held for each investment type.
These types of investment are termed permitted investments and any investments used which
have not been approved as a permitted investment will be considered ultra vires.
7.5.1 The permitted investments which may be used in the forthcoming year are noted below.
Details of the risks, mitigating controls and limits associated with each of these permitted
categories are shown in Appendix 3.
• Cash Type Instruments
▪ Deposits with the Debt Management Account Facility (UK Government)
▪ Deposits with other local authorities or public bodies
▪ Money Market Funds
▪ Call accounts, deposit accounts with financial institutions (banks and building
societies
▪ Term deposits with financial institutions (banks and building societies)
▪ UK Government Gilts and Treasury Bills
▪ Certificates of deposits will financial institutions (banks and building societies)
▪ Structured deposit facilities with banks and building societies (escalating
rates, de-escalating rates, etc).
• Other Investments
▪ Investment properties
▪ Loans to third parties, including soft loans
▪ Loans to a local authority company
▪ Shareholding in a local authority company
▪ Non-local authority shareholdings
▪ Joint venture delivery companies such as Hub West Scotland
▪ Regeneration partnerships and development opportunities
▪ District Heating Schemes
▪ Local Authority Mortgage Scheme (LAMS).
7.5.2 Permitted investments related to the Common Good are also shown in Appendix 3, and where
applicable the same counterparty selection criteria as noted in 6.6 below will be applied.
7.6 Investment Counterparty Selection Criteria
The primary principle governing the Council’s investment criteria is the security of its
investments, although the yield or return on the investment is also a key consideration.  After
this main principle the Council will ensure:
Page 116

Page 117

• It maintains a policy covering both the categories of investment types it will invest in,
criteria for choosing investment counterparties with adequate security, and monitoring their
security.
• It has sufficient liquidity in its investments.  For this purpose it will set out procedures for
determining the maximum periods for which funds may prudently be committed.  These
procedures also apply to the Council’s prudential indicators covering the maximum
principal sums invested.
7.6.1 The Section 95 Officer will maintain a counterparty list in compliance with the following criteria
and will revise the criteria and submit them to Council for approval as necessary.  This criteria
selects which counterparties the Council will choose from, rather than defining what its
investments are.  
7.6.2 Credit rating type and definitions are attached within Appendices 4 and 6.
7.6.3 Credit rating information is supplied by our treasury consultants on all active counterparties
that comply with the criteria below.  Any counterparty failing to meet the criteria would be
omitted from the counterparty (dealing) list.  Any rating changes, rating watches (notification of
a likely change), rating outlooks (notification of a possible longer term change) are provided to
officers almost immediately after they occur and this information is considered before dealing. 
For instance a negative rating watch applying to any counterparty at the minimum Council
criteria will be suspended from use, with all others being reviewed in light of market
conditions.
7.6.4 The criteria for providing a pool of high quality cash type investment counterparties is:
• Category 1 - Good Credit Quality – the Council will only use financial institutions
(including certificates of deposit and corporate bonds) which:
▪ Are UK banks; and/or
▪ Are non-UK and domiciled in a country which has a minimum Sovereign long
term rating of AA; The UK will be excluded from any Sovereign rating criteria.
▪ And have, as a minimum, the following Fitch, Moody’s and Standard and
Poors (S&P) credit ratings (where rated):
o Short Term – F1 (or equivalent from Fitch, Moody’s and S&P)
o Long Term – A- (or equivalent from Fitch, Moody’s and  S&P)
The difference between the ratings will be reflected in the money limits as noted
in Table K in Appendix 6.
• Category 2 – Part nationalised UK banks – Lloyds Bank Group and Royal Bank of
Scotland Group. These banks can be included if they continue to be part nationalised or
they meet the ratings in Category 1 above.
• Category 3 - The Council’s own banker for transactional purposes if the bank falls below
the above criteria specified in category 1, although in this case balances will be minimised
in both monetary size and time.
• Category 4 - Bank Subsidiary and Treasury Operations – the Council will use these
where the parent bank has the necessary ratings outlined in category 1.
Page 117

Page 118

• Category 5 - Building Societies – the Council will use all Societies which meet the
ratings for banks outlined in category 1.
• Category 6 - Money Market Funds – the Council will use either Constant Net Asset
Value (CNAV) or Low Volatility Net Asset Value (LVNAV) money market funds that are
AAA rated (by at least one of the 3 rating agencies)
• Category 7 - UK Government (including gilts, treasury bills and the Debt Management
Account Deposit Facility (DMADF/HM Treasury)
• Category 8 - Local Authorities, etc
7.6.5 Due to the uncertainty in the financial markets it is recommended that the Investment Strategy
is approved which will provide officers with the flexibility to deal with any unexpected
occurrences.  Officers can restrict the pool of available counterparties from these criteria to
safer instruments and institutions.
7.6.6 The time limits for institutions on the Council’s cash type counterparty list are as noted in
Table J in Appendix 6.
7.6.7 The Council’s bankers are currently Virgin Money (previously known as the Clydesdale Bank
Plc) which falls within Category 3.  It is recognised that the money limit of £5million may be
breached for purely operational purposes on a temporary overnight basis only.  The Chief
Officer - Resources will endeavour to avoid this scenario but this allows for circumstances that
are outwith the Council’s control where funds may be deposited unexpectedly or at short
notice into the Council’s accounts after the dealing deadline for the day has passed.  In such a
circumstance the funds will require to be kept on an overnight basis in the Council’s bank
account until appropriate arrangements can be made for investment.
7.6.8 Table J does not include a monetary limit for category 7 which are funds deposited with the
UK Government namely the DMADF.  This facility allows local authorities to deposit surplus
cash on flexible terms and receive a market related rate of interest.  Funds are held by the
Bank of England and the scheme carried the Government’s own sovereign credit rating
offering the highest available security and therefore no maximum monetary limit has been set.
7.6.9 Country and sector considerations - Due care will be taken to consider the country, group
and sector exposure of the Council’s investments.  In part the country selection will be chosen
by the credit rating of the Sovereign state in Banks 1 above and the list of approved countries
for investments are detailed in Appendix 5.  In addition:
• No more than 25% will be placed with any country outside of the UK at any time
• Limits in place above will apply to Group companies
• Sector limits will be monitored regularly for appropriateness.
7.6.10Use of additional information other than credit ratings – Additional requirements under
the Code of Practice now requires the Council to supplement credit rating information.  Whilst
the above criteria relies primarily on the application of credit ratings to provide a pool of
appropriate counterparties for officers to use, additional operational market information will be
applied before making any specific investment decision from the agreed pool of
counterparties.  This additional market information (for example Credit Default Swaps,
negative rating watches/outlooks) will be applied to compare the relative security of differing
investment counterparties.
Page 118

Page 119

7.6.11Economic Investment Considerations – Current forecasts on shorter-term interest rates,
on which investment decisions are based, show a potential for the current 0.75% Bank Rate to
continue to slowly increase.  The Council’s investment decisions are based on comparisons
between the rises priced into market rates against the Council’s and advisers own forecasts.   
7.6.12There is an operational difficulty arising from the current economic situation. There is
currently little value investing longer term unless credit quality is reduced.  Whilst some
selective options do provide additional yield uncertainty over counterparty creditworthiness
suggests shorter dated investments would provide better security.
7.6.13The criteria for choosing counterparties set out above provide a sound approach to
investment in “normal” market circumstances.  Whilst Members are asked to approve this
base criteria above, under the exceptional current market conditions the Section 95 Officer
(Chief Officer - Resources) may temporarily restrict further investment activity to those
counterparties considered of higher credit quality than the minimum criteria set out for
approval.  These restrictions will remain in place until the banking system returns to “normal”
conditions.  Similarly the time periods for investments will be restricted.
7.7 Sensitivity to Interest Rate Movements - Whilst most of the risks facing the treasury
management service are addressed elsewhere in this report (credit risk, liquidity risk, market
risk, maturity profile risk), the impact of interest rate risk is discussed but not quantified.  
Table K in Appendix 6 highlights the estimated impact of a 1% increase/decrease in all
interest rates to the estimated treasury management costs/income for next year.  That
element of the debt and investment portfolios which are of a longer term, fixed interest rate
nature will not be affected by interest rate changes.
7.8 Ethical Investments - This is the placing of funds and selecting investments in a
manner that reflects an authority’s ethical values. Generally, two sets of criteria are
drawn up – negative and positive values whereby investments are to be avoided or
encouraged. 
7.8.1 The following policy statement was approved on 25 October 2017:
7.8.2  The Council will not knowingly invest directly in organisations (including financial
institutions and money market funds) whose activities and practices pose a risk of
serious harm to individuals and/or groups, or whose activities are inconsistent with
the Council’s vision, values and priorities.  This could include avoiding direct
investment in organisations with material links to:
• Human rights abuse (e.g. child labour)
• Environmentally harmful activities (e.g. destruction of habitat)
• Socially harmful activities (e.g. gambling).
7.8.3  In order to give effect to its commitment to this policy the Chief Officer - Resources
contacted all investment counterparties on 9 January 2018 advising of our policy.
7.8.4  In accordance with the further commitments that were given in October 2017 it is
considered that this policy statement remains relevant and does not require to be
amended at this time.
8. Treasury Management Limits on Activity
Page 119

Page 120

8.1 There are four further treasury activity limits, which were previously prudential indicators.  The
purpose of these prudential indicators is to contain the activity of the treasury function within
certain limits, thereby managing risk and reducing the impact of an adverse movement in
interest rates.  However, if these are set to be too restrictive they will impair the opportunities
to reduce costs.   
• Upper limits on variable interest rate exposure – This indicator identifies a maximum limit
for variable interest rates based upon the debt position net of investments 
• Upper limits on fixed interest rate exposure – Similar to the previous indicator this covers a
maximum limit on fixed interest rates. 
• Maturity structures of borrowing – These limits are set to reduce the Council’s exposure to
large fixed rate sums falling due for refinancing, and are required for upper and lower
limits.   
• Total principal funds invested for greater than 364 & 365 days - These limits are set with
regard to the Council’s liquidity requirements and to reduce the need for early sale of an
investment, and are based on the availability of funds after each year-end. 
The proposed indicators are shown within Table L in Appendix 6. 
8.2 The upper limit applies to the maturity structure of fixed interest rate borrowing in Table M. 
The level has been set to take account of the way that local authorities have to record certain
market loans where the maturity date is deemed to be the next call date rather than the
eventual repayment date. 
9. Performance Indicators 
9.1 The Code of Practice on Treasury Management requires the Council to set performance
indicators to assess the adequacy of the treasury function over the year.  These are distinct
historic indicators, as opposed to the prudential indicators, which are predominantly forward
looking.  Examples of performance indicators often used for the treasury function are: 
• Debt – Borrowing - Average rate of borrowing for the year compared to average available
• Debt – Average rate movement year on year
• Investments – Internal returns above the 7 day SONIA rate. 
9.2 The results of these indicators will be reported in the Treasury Annual Report for 2022/23. 
10. Treasury Management Advisors   
10.1 The Council uses Link Asset Services as its treasury management advisors.  The company
provides a range of services which include: 
• Technical support on treasury matters, capital finance issues and the drafting of Member
reports
• Economic and interest rate analysis
• Debt services which includes advice on the timing of borrowing
• Debt rescheduling advice surrounding the existing portfolio
• Generic investment advice on interest rates, timing and investment instruments
• Credit ratings/market information service comprising the three main credit rating agencies. 
Page 120

Page 121

10.2 The current treasury advisor contract was awarded to Link Asset Services following a quick
quote exercise and commencing on 1 May 2021 until 30 April 2023, with an option to extend
for one year. This option was recently agreed with the contract now due to terminate on the
30th April 2024.
10.3 The Council recognises that responsibility for treasury management decisions remains with
the organisation at all times and will ensure that undue reliance is not place upon external
service providers.
10.4 The Council also recognises that there is value in employing external providers of treasury
management services in order to acquire access to specialist skills and resources.  The
Council will ensure that the terms of their appointment and the methods by which their value is
assessed are properly agreed and documented, and subjected to regular review.
10.5 Whilst the advisers provide support to the internal treasury function the final decision on
treasury matters remains with the Council.
11. The Monitoring of Investment Counterparties
11.1 The credit rating of counterparties will be monitored regularly.  The Council receives credit
rating information (changes, rating watches and rating outlooks) from Link Asset Services as
and when ratings change, and counterparties are checked promptly.  On occasion ratings may
be downgraded when an investment has already been made.  The criteria used are such that
a minor downgrading should not affect the full receipt of the principal and interest.  Any
counterparty failing to meet the criteria will be removed from the list immediately by the Chief
Officer - Resources and, if required, new counterparties which meet the criteria will be added
to the list. 
Page 121

Page 122

Appendix 3
West Dunbartonshire Council and Common Good Funds Permitted Investments,
Associated Controls and Limits
Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Cash Type Instruments
Deposits with
the Debt
Management
Account Facility
(UK
Government)
(Very low risk)
This is a deposit with the
UK Government and as
such counterparty and
liquidity risk is very low, and
there is no risk to value. 
Deposits can be between
overnight and 6 months.
Little mitigating controls
required.  As this is a UK
Government investment the
monetary limit is unlimited to
allow for a safe haven for
investments.
As shown in
Table J.
Deposits with
other local
authorities or
public bodies
(Very low risk)
These are considered quasi
UK Government debt and
as such counterparty risk is
very low, and there is no
risk to value.  Liquidity may
present a problem as
deposits can only be
broken with the agreement
of the counterparty, and
penalties can apply.
Deposits with other non-
local authority bodies will
be restricted to the overall
credit rating criteria.
Little mitigating controls
required for local authority
deposits, as this is a quasi UK
Government investment.
Non- local authority deposits
will follow the approved credit
rating criteria.
As shown in
Table J.
Money Market
Funds (MMFs)
(Very low risk)
Pooled cash investment
vehicle which provides very
low counterparty, liquidity
and market risk.  These will
primarily be used as
liquidity instruments.
Funds will only be used where
the MMFs has an “AAA” rated
status from either Fitch,
Moody’s or Standard and
Poor’s.
As shown in
Table J.
Call account
deposit
accounts with
financial
institutions
(banks and
building
societies) (Low
risk depending
on credit
rating)
These tend to be low risk
investments, but will exhibit
higher risks than the first
three categories above. 
Whilst there is no risk to
value with these types of
investments, liquidity is
high and investments can
be returned at short notice. 
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Page 122

Page 123

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Term deposits
with financial
institutions
(banks and
building
societies) (Low
to medium risk
depending on
period & credit
rating)
These tend to be low risk
investments, but will exhibit
higher risks than the first
three categories above. 
Whilst there is no risk to
value with these types of
investments, liquidity is low
and term deposits can only
be broken with the
agreement of the
counterparty, and penalties
may apply.  
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Government
Gilts and
Treasury Bills
(Very low risk)
These are marketable
securities issued by the UK
Government and as such
counterparty and liquidity
risk is very low, although
there is potential risk to
value arising from an
adverse movement in
interest rates (no loss if
these are held to maturity.  
Little counterparty mitigating
controls are required, as this is
a UK Government investment.  
The potential for capital loss will
be reduced by limiting the
maximum monetary and time
exposures.
As shown in
Table J.
Certificates of
deposits with
financial
institutions (Low
risk)
These are short dated
marketable securities
issued by financial
institutions and as such
counterparty risk is low, but
will exhibit higher risks than
the first three categories
above.  There is risk to
value of capital loss arising
from selling ahead of
maturity if combined with
an adverse movement in
interest rates.  Liquidity risk
will normally be low.
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Page 123

Page 124

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Structured
deposit facilities
with banks and
building
societies
(escalating / de-
escalating rates,
etc.) (Low to
medium risk
depending on
period & credit
rating)
These tend to be medium
to low risk investments, but
will exhibit higher risks than
the first three categories
above.  Whilst there is no
risk to value with these
types of investments,
liquidity is very low and
investments can only be
broken with the agreement
of the counterparty
(penalties may apply).  
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Corporate
Bonds (Medium
to high risk
depending on
period & credit
rating)
These are marketable
securities issued by
financial and corporate
institutions.  Counterparty
risk will vary and there is
risk to value of capital loss
arising from selling ahead
of maturity if combined with
an adverse movement in
interest rates.  Liquidity risk
will be low
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
Corporate bonds will be
restricted to those meeting the
base criteria.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Other Types of Investments
Investment
properties
These are properties that
are not used to facilitate
service delivery but are
held solely to earn rentals
or for capital appreciation
or both.  These are highly
illiquid assets with high risk
to value (the potential for
property prices to fall or for
rental voids).  
In larger investment portfolios
some small allocation of
property based investment may
counterbalance/compliment the
wider cash portfolio.
Property holding will be re-
valued regularly and reported
annually with gross and net
rental streams.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m. 
Page 124

Page 125

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Loans to third
parties, including
soft loans
These are service
investments either at
market rates of interest or
below market rates (soft
loans).  These types of
investments may exhibit
credit risk and are likely to
be highly illiquid.
Each third party loan requires
Member approval and each
application is supported by the
service rational behind the loan
and the likelihood of partial or
full default.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Loans to a local
authority
company
These are service
investments either at
market rates of interest or
below market rates (soft
loans).  These types of
investments may exhibit
credit risk and are likely to
be highly illiquid.
Each loan to a local authority
company requires Member
approval and each application
is supported by the service
rational behind the loan and the
likelihood of partial or full
default.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Shareholdings in
a local authority
company
These are service
investments which may
exhibit market risk and are
likely to be highly illiquid.
Each equity investment in a
local authority company
requires Member approval and
each application will be
supported by the service
rational behind the investment
and the likelihood of loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Non-local
authority
shareholdings
These are non-service
investments which may
exhibit market risk, be only
considered for longer term
investments, likely to be
liquid.
Any non-service equity
investment will require separate
Member approval and each
application will be supported by
rational behind the service the
investment and the likelihood of
loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Page 125

Page 126

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Joint venture
delivery
companies such
as hub West
Scotland
Public sector organisations
across a hub territory will
work in partnership with
each other, and a private
sector delivery partner, in a
joint venture delivery
company called hub West
Scotland.
.
Any investment in hub West
Scotland requires approval
from the Section 95 Officer
(Chief Officer - Resources) and
the Chief Executive in
consultation with the Leader of
the Council and the Leader of
the Opposition and each
application will be supported by
the service rational behind the
investment and the likelihood of
loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Regeneration
partnerships and
development
opportunities 
Investments undertaken
with the prime intention of
local area regeneration.
Any investment in a
regeneration partnership /
development opportunity
requires Member approval with
each application supported by
rational behind the investment
and the likelihood of loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Investment in
Projects
procured and
managed by
third parties e.g.
District Heating
Schemes
Investments undertaken to
assist in facilitating third
party projects where the
Council has an interest in
the successful outcome of
the project. Expectation of
a financial return for the
Council.
Any investment in such projects
requires Member approval and
each application will be
supported by a business case
for the investment and the
expectation of a financial
benefit to the Council.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Local Authority
Mortgage
Scheme (LAMS)
These are service
investments at market rates
of interest.  Under this
scheme the Council is
required to place funds for
a number of  years with the
bank which is participating
in this scheme
Any investment in the LAMS
requires Member approval and
each application will be
supported by the service
rational behind the investment
and the likelihood of loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Page 126

Page 127

Appendix 4
Type of Rating Rating Explanation
Fitch
-Short Term
F1+ Indicates exceptionally strong capacity for timely payment of
financial commitments
F1 Indicates strong capacity for timely payment of financial
commitments
Fitch
- Long Term
AA- Indicates very strong capacity for timely payment of financial
commitments and this capacity is not significantly vulnerable
to foreseeable events
A- Indicates strong capacity for timely payment of financial
commitments.  This capacity may, nevertheless, be more
vulnerable to changes in circumstances or in economic 
conditions than is the case for higher ratings
Moody’s
- Short Term
P-1 Banks based Prime-1 for deposits offer superior credit quality
and a very strong capacity for timely payment of short term 
deposit obligations
Moody’s
- Long Term
Aa Offer excellent credit quality, with susceptibility to long term
risks with a vulnerability to greater fluctuations within 
protective elements
A Offer excellent credit quality, but elements suggest a
Susceptibility to impairment over the long term
Standard & Poors
- Short Term
A-1 Indicates a strong capacity to meet institutions financial
commitments.  Within this category, certain obligors are designated
with a plus sign (+).  This indicates that the obligor’s capacity 
to meet its financial commitments is EXTREMELY STRONG
Standard & Poors
- Long Term
AA- Indicates strong capacity for timely payment of financial
commitments
A- Indicates strong capacity for timely payment of financial
commitments.  This capacity may, nevertheless, be more 
susceptible to the adverse effects of changes in circumstances
or in economic conditions than is the case for higher rated 
category
Page 127

Page 128

Appendix 5
West Dunbartonshire Council and Common Good Funds Permitted Investments,
Approved Countries for Investments
Based on lowest available rating
AAA  
• Australia
• Denmark
• Germany
• Luxembourg
• Netherlands
• Norway
• Singapore
• Sweden
• Switzerland
AA+
• Canada
• Finland
• U.S.A.
AA
• Abu Dhabi (UAE)
• France
AA-
• Belgium
• Hong Kong
• Qatar
• U.K.
Please note that this is the list will be updated as required on an ongoing basis
Page 128

Page 129

West Dunbartonshire Council Prudential and Treasury Indicators Appendix 6
General Services 31,168   79,916 68,004         28,206        14,619        11,666        11,056        11,006        10,800        10,799        10,799
Capital receipts 10 (0) 1 0 0 0 0 0 0 0 0
Capital grants 12,186 26,007 17,650 14,825 8,080 7,087 6,607 6,607 6,607 6,607 6,607
Revenue 73 0 0 0 0 0 0 0 0 0 0
Other funding 722 69 0 0 0 0 0 0 0 0 0
Net financing need for the year 18,177 53,840 50,354 13,381 6,539 4,579 4,449 4,399 4,193 4,192 4,192
HRA 37,831 66,277 52,627 42,374 39,311 22,336 21,487 21,917 22,355 21,854 21,854
Capital receipts 0 0 0 0 0 0 0 0 0 0 0
Capital grants 10,896 8,923 6,125 4,000 4,000 0 0 0 0 0 0
Revenue 5,386 840 443 2,792 2,793 200 155 454 1,044 2,253 2,253
Other funding 0 0 0 0 0 0 0 0 0 0 0
Net financing need for the year 21,549 56,514 46,059 35,582 32,518 22,136 21,332 21,463 21,311 19,601 19,601
General Services 31,168 79,916 68,004 28,206 14,619 11,666 11,056 11,006 10,800 10,799 10,799
HRA 37,831 66,277 52,627 42,374 39,311 22,336 21,487 21,917 22,355 21,854 21,854
Capital Expenditure 68,999 146,193 120,631 70,580 53,930 34,002 32,543 32,922 33,155 32,653 32,653
Capital receipts 10 (0) 1 0 0 0 0 0 0 0 0
Capital grants 23,082 34,930 23,775 18,825 12,080 7,087 6,607 6,607 6,607 6,607 6,607
Revenue 5,459 840 443 2,792 2,793 200 155 454 1,044 2,253 2,253
Other funding 722 69 0 0 0 0 0 0 0 0 0
Net financing need for the year 39,727 110,354 96,413 48,962 39,058 26,715 25,781 25,862 25,504 23,793 23,793
Capital Financing Requirement
CFR – General Services         400,842   448,441         491,864   497,667   495,992   492,506   489,394   486,504   481,693   476,402   470,797 
CFR – HRA         305,400   353,971         390,959   417,036   439,758   450,402   459,625   468,526   477,018   484,059   491,874 
Total CFR         706,242   802,412         882,823   914,703   935,751   942,909   949,018   955,030   958,711   960,461   962,671 
Movement in CFR 26,397   96,170 80,411         31,880        21,048          7,158          6,110          6,011          3,681          1,750          2,210
Movement in CFR represented by
Net financing need for the year (above) 39,727   110,354 96,413         48,962        39,058        26,715        25,781        25,862        25,504        23,793        23,793 
Loans Fund Review -                 - -                   - -                   - -                   - -                   - - 
Less scheduled debt amortisation and other financing
movements         (13,330)  (14,184)        (16,001)      (17,082)      (18,010)      (19,558)      (19,671)      (19,850)      (21,823)      (22,043)      (21,583)
Movement in CFR 26,397   96,170 80,411         31,880        21,048          7,158          6,110          6,011          3,681          1,750          2,210
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Forecast
2032/33
Financed by:
Table B - Capital Financing Requirement 
£000 Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Forecast
2032/33
Forecast
2032/33
Financed by:
General Services and HRA Combined
£000 Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2026/27
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32£000 Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Forecast
2032/33
Financed by:
Table A - Net Capital Financing Need
General Services and HRA Shown Separately
£000 Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Page 129

Page 130

West Dunbartonshire Council Prudential and Treasury Indicators Appendix 6
Table C - Internal Loan Fund Repayment Profile (excluding PPP repayments)
£000 £000 £000
Under 12 months 2,527 7,017 9,545
2 years to 5 years 22,121 36,314 58,436
6 years to 10 years 41,323 61,543 102,866
11 years to 15 years 49,846 57,689 107,535
16 years to 20 years 47,793 65,251 113,045
21 years to 25 years 42,074 69,823 111,897
26 years to 30 years 36,673 52,710 89,383
31 years to 35 years 36,261 34,069 70,330
36 years to 40 years 23,468 19,776 43,244
41 years to 45 years 12,729 6,670 19,399
46 years to 50 years 12,640 4,328 16,968
51 years to 55 years 17,482 6,656 24,139
56 years to 60 years 27,070 9,506 36,576
60  years plus 133,862 1,176 135,038
General Services (Exc PPP) 4.06% 4.09% 4.89% 5.14% 5.50% 5.60% 5.85% 5.96% 6.43% 6.57% 6.57%
General Services 8.43% 7.63% 8.92% 8.62% 9.01% 9.11% 9.37% 9.51% 3576.56% 3582.69% 3616.90%
HRA 3.19% 3.62% 8.26% 12.08% 14.95% 17.40% 19.86% 21.46% 22.63% 23.67% 25.24%
External Debt
Debt at 1 April 585,408 615,175 714,483 798,483 834,681 860,438 872,255 882,127 891,934 900,095 906,696
New Borrowing - CFR 29,767 99,308 84,000 36,198 25,757 11,816 9,873 9,806 8,161 6,601 7,198
Debt at 31 March 615,175 714,483 798,483 834,681 860,438 872,255 882,127 891,934 900,095 906,696 913,894
Long Term Liabilities at 1 April 92,485 89,115 85,977 82,388 78,070 73,361 68,702 64,939 61,144 56,664 51,813
Change in Long Term Liabilities (3,370) (3,138) (3,589) (4,318) (4,709) (4,659) (3,763) (3,795) (4,480) (4,851) (4,989)
Long Term Liabilities at 31 March 89,115 85,977 82,388 78,070 73,361 68,702 64,939 61,144 56,664 51,813 46,825
Gross Debt at 31 March         704,290   800,460         880,871   912,751   933,799   940,957   947,066   953,078   956,759   958,509   960,719 
Capital Financing Requirement         706,242   802,412         882,823   914,703   935,751   942,909   949,018   955,030   958,711   960,461   962,671 
Under / (Over) Borrowing 1,952         1,952 1,952 1,952          1,952          1,952          1,952          1,952          1,952          1,952          1,952
Forecast
2031/32
Forecast
2032/33
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Forecast
2032/33
Table E - Gross External Debt compared to the Underlying Need to Borrow (CFR)
£000 Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Table D - Ratio of Financing Costs to Net Revenue Stream
Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2028/29
General
Services HRA Total
Page 130

Page 131

West Dunbartonshire Council Prudential and Treasury Indicators Appendix 6
External Debt        676,693     785,931         878,332       918,149      946,482      959,480      970,340      981,127      990,104      997,365   1,005,284
Long Term Liability          98,026       94,575           90,627         85,877        80,697        75,572        71,433        67,259        62,331        56,995        51,507
Total        774,719     880,506         968,958    1,004,026   1,027,179   1,035,052   1,041,773   1,048,386   1,052,435   1,054,360   1,056,791
External Debt        738,210     857,380         958,180    1,001,617   1,032,526   1,046,705   1,058,553   1,070,320   1,080,114   1,088,035   1,096,673
Long Term Liability        106,938     103,172         108,865       103,684        98,033        92,443        87,927        83,373        77,997        72,176        66,190
Total        845,148     960,552      1,067,046    1,105,302   1,130,559   1,139,148   1,146,480   1,153,693   1,158,111   1,160,211   1,162,863
Bank Rate 4.25% 4.50% 4.50% 4.25% 4.00% 3.75% 3.25% 3.00% 2.75% 2.75% 2.50% 2.50% 2.50%
5yr PWLB Rate 4.00% 4.00% 3.90% 3.80% 3.70% 3.60% 3.50% 3.40% 3.30% 3.20% 3.10% 3.10% 3.10%
10yr PWLB Rate 4.20% 4.20% 4.10% 4.00% 3.90% 3.80% 3.60% 3.50% 3.50% 3.40% 3.30% 3.30% 3.20%
25yr PWLB Rate 4.60% 4.60% 4.40% 4.30% 4.20% 4.10% 3.90% 3.80% 3.70% 3.60% 3.50% 3.40% 3.40%
50yr PWLB Rate 4.30% 4.30% 4.20% 4.10% 3.90% 3.80% 3.60% 3.60% 3.40% 3.30% 3.20% 3.20% 3.10%
Long term rating 1 year 2 years 3 years 4 years 5 years
AAA 0.04% 0.09% 0.17% 0.25% 0.34%
AA 0.02% 0.04% 0.09% 0.16% 0.23%
A 0.05% 0.14% 0.25% 0.37% 0.52%
BBB 0.13% 0.36% 0.63% 0.96% 1.30%
BB 0.62% 1.77% 3.05% 4.32% 5.52%
B 2.73% 6.69% 10.34% 13.32% 15.71%
CCC 19.10% 27.28% 32.05% 35.55% 38.34%
Note - The AAA default risk is actually higher than the AA default risk due the number of AAA rated institutions left
Jun-25 Sep-25 Dec-25 Mar-26
Table I - Historic Risk of Default
Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-25
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Forecast
2032/33
Table H - Interest Rate Forecast
Link Asset Services Interest Rate View Mar-23 Jun-23 Sep-23
Table G - Authorised Limit
£000 Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2028/29
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Forecast
2032/33
Table F - Operational Boundary
£000 Forecast
2022/23
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Page 131

Page 132

West Dunbartonshire Council Prudential and Treasury Indicators Appendix 6
Investment Fitch
Category (or
equivalent)
Money
Limit
F1+ / AA- £10million
F1 / A- £5 million
2 F1/A- £10 million
(per group)
3 £5 million
4 £5 million
5 As in 1 above
£10million
and
£5million
Sector Limit £25 million
Fund Limit £5 million
7 No limit
Sector imit £25 million 
Fund Limit £5 million
£000 2021/22
Estimate 1% -1%
Variable Rate Debt Payments N/A N/A N/A
Variable Rate Investment income 75 150 (75)
Table K - Sensitivity to Interest Rate Movements
364 days
364 days
6 Very liquid no time limit
applies
6 months
8 364 days
Time Limit
1 364 days
364 days
Overnight
Table J -  Counterparty Limits
Page 132

Page 133

West Dunbartonshire Council Prudential and Treasury Indicators Appendix 6
Limits on fixed interest
rates
Limits on variable
interest rates
Lower                Upper Lower Upper Lower Upper
Under 12 months 0% 50% 0% 50% 0% 50%
12 months to 2 years 0% 50% 0% 50% 0% 50%
2 years to 5 years 0% 50% 0% 50% 0% 50%
5 years to 10 years 0% 50% 0% 50% 0% 50%
10 years to 20 years 0% 50% 0% 50% 0% 50%
20 years to 30 years 0% 50% 0% 50% 0% 50%
30 years to 40 years 0% 50% 0% 50% 0% 50%
40 years to 50 years 0% 100% 0% 100% 0% 100%
50 years to 60 years 0% 100% 0% 100% 0% 100%
60 years to 70 years 0% 100% 0% 100% 0% 100%
Principal sums invested
> 364 & 365 days £7m
Maturity Structure of fixed interest rate borrowing
£nil £7m £nil £7m £nil
100% 100% 100%
50% 50% 50%
Table L- Treasury Management Limits on Activity
2022/23 2023/24 2024/25
Upper Upper Upper
Page 133

Page 134

Page 134

Page 135

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 29 March 2023
___________________________________________________________________
Subject: General Services Budgetary Control Report to 31 January 2023
(Period 10)
1. Purpose
1.1 This report provides an update on the General Services revenue budget and
the approved capital programme to 31 January 2023.
2. Recommendations
2.1 Council is asked to:
i) note a current projected annual adverse variance on the revenue
account of £1.999m (0.78% of total budget); and
ii) note that projected expenditure on the capital account is lower than the
2022/23 budget by £35.309m (53.04% of budget), made up of
£30.488m (45.79% of budget) of project re-profiling, and an in-year net
underspend of £4.820m (7.24% of budget).
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council (the Council) on 9 March
2022, Members agreed the revenue estimates for 2022/2023. A total net
budget of £251.693m was approved for General Services, before use of
balances.
3.2 Since the budget was agreed, additional funding has been provided by the
Scottish Government and a further allocation of the Council’s existing general
COVID funds has resulted in a revised total net budget of £257.137m.
£m
Budget as set – Council 9 March 2022 251.693
S. Govt – Easter Provision Fund 0.101
Covid Reserves (Council June 2022) – Cost of Living Crisis 0.600
S.Govt – revenue/ alternative funding for pay award 4.743
257.137
3.3 The % pay award for non teaching Local Government employees has been
agreed and paid out.  Funding from Scottish Government has been confirmed
to fund part of the increase from budgeted to agreed payaward. The funding
due to be received has been included in section 3.2 above, with the additional
budget this allows, being transferred to Council services and included within
the Budgetary Control Reports.  
ITEM 13
Page 135

Page 136

3.4 An agreement has recently been reached in relation to the Chief Officer pay
award, with a further agreement reached to remove the £60,000 cap for all
non-teaching Local Government employees.  Officers are currently working on
the cost implications of this in relation to 2022/23, therefore the figures in this
report do not reflect the updated position yet.
3.5 The teachers’ pay award has recently been agreed but not yet paid out.
Officers are currently reviewing the cost implication to the council and the
extent to which this will be funded by the Scottish Government.  Therefore, the
figures in this report do not reflect the updated position yet.
Reserves
3.4 The General Fund balance at 31 March 2022, based on the Councils audited
2021/22 annual accounts, can be analysed as follows:
Balance (£m)
Balance on General Fund as at 31 March 2021  15.020
Earmarked Balances (11.517)
Contingency allowance at 2% of net expenditure (3.123)
Unallocated Balance as at 31 March 2022   0.380
3.5 Due to the current financial challenges facing the Council, recruitment
restrictions have been implemented and the filling of vacancies is subject to
active review. For variances linked to this action (beyond the budgeted
turnover targets), in year savings through not filling vacancies, are now being
removed from services and held in a central code. This has resulted in a
number of favourable service variances being removed from services and
held centrally (currently £1.257m).  This has no impact on the overall
projected outturn of the Council, simply on how that outturn is reported. 
3.6 With vacancy savings being removed from service budgets and transferred to
a central budget, other projected overspends identified within services are
now more clearly reported. This demonstrates that, if the Council were to only
meet the budgeted turnover level of vacancies there would be a far more
significant overspend which highlights the extent to which the Council cannot
afford to operate with its current full establishment.
3.7 The effects of removing the vacancy savings from service budgets to a central
budget as at Period 10 are noted below:
Service with Vacancy
Transfers at Period 10
Variance in
BCR
(under)/over
£000
Vacancy
Savings Moved
to Central
Budget
(under)/over
£000
Variance if
vacancies
were not
removed
(under)/over
£000
Resources 109 (42) 67
Regulatory and Regeneration 231 (450) (219)
People and Technology (158) (187) (345)
Page 136

Page 137

Housing and Employability 84 (55) 5
Supply Distribution & Property 143 (185) (42)
Citizens, culture & Facilities (33) (338) (371)
Central Budget (1,257)
Capital
3.8 At its 9 March 2022 meeting the Council also agreed the updated General
Services Capital Plan for 2022/2023 to 2030/31.  The three years from
2022/23 to 2024/25 were approved in detail with the remaining years being
indicative at that stage. After adjusting for anticipated re-profiling from 2021/22
into 2022/23, the budget agreed for 2022/23 was £54.181m, as noted below.   
3.9 Since then, budget adjustments have taken place (through further 2021/22
capital re-profiling and additional external funding), revising the 2022/23
annual budget to £66.576m, as follows:
£m
Base Budget 2022/23 (before re-profiling) 33.471
Re-profiling from 2021/22 – March 2022 18.035
Increase capital budget from 9 March 2022 Council meeting:
Changing Places Toilets 0.050
Roads and Pavements 2.000
Flood Prevention 0.500
Street Sign Renewal 0.100
Children & Families Team TBC
Christmas Lighting TBC
Large Bins for High Traffic Areas 0.025
Pothole Rapid Repair Service TBC
Anticipated budget 2022/23 (Council – March 2022) 54.181
Additional re-profiling from 2021/22 – following year end 7.593
New Funding introduced to Period 10
CFCR (HSCP) 0.010
District Heating Consultancy 0.120
SG – Clyde Walking, Safer Streets 0.566
SG – Nature Restoration Fund 0.126
Place Based Investments 0.676
SPT – Kilbowie Road Bus Route 0.495
SPT – Congestion Reduction Measures 0.330
SPT – Balloch Station Park and Ride 0.050
SPT – Bus Infrastructure Improvements 0.200
Cost of Living Crisis (Council June 2022) 1.000
Acceleration of Schools Estate Improvement Plan 0.240
SG – Play park upgrade 0.079
SG – Free School Meal Expansion 0.495
National Acquisitions 0.011
SMPT Carless 0.200
Acceleration of budget – Clydebank Elderly Care 0.019
Page 137

Page 138

Session Initial Protocol (SIP) project Swan Trunking 0.030
Demolition 215 Main St, Alexandria 0.155
Revised budget – Period 10 66.576
4. Main Issues
Revenue
4.1 At the meeting of Council 21 December 2022, Members were advised of the
projected adverse year end variance (overspend) as at 31 October 2022
(Period 7) of £1.447m.  A further updated adverse position as at 31 December
2022 (Period 9) of £2.143m was provided to Council on 1 March 2023, as part
of the 2023/24 budget report.  Since then, the 2022/23 year end variance has
been updated as at 31 January 2023 (Period 10) as shown in Appendix 1 and
highlights a revised projected annual adverse variance of £1.999m (0.78% of
the total budget). The following table explains the relevant movements across
services from the figure reported at period 7 (£1.447m) to the current
projection as at period 10 (£1.999m):
£m £m
Adverse variance as at 31 October 2022 (Period 7) – Council
21 December 2022
1.447
Movements between Period 7 and Period 9:
Education Increase in Residential Care Costs (ref
paragraph 4.2).
1.419
Reduction in education expenditure primarily
due to a reduction in employee costs in
relation to industrial action (ref paragraph
4.3).
(0.482)
People &
Technology
(Mainly
Information
Services)
Reduction in expenditure relating mainly to
reduced employee costs and supplies &
service costs.  Also, includes additional
income from external recharges.
(0.122)
Supply,
Distribution &
Property
Improved overall net expenditure position
relating mainly to the income forecast within
Corporate Asset Maintenance now
anticipated to be back inline with budget.
(0.113)
All Other Services Movement across all services. (0.006)
Total Movements between Period 7 and Period 9 0.696
Adverse variance as at 31 December 2022 (Period 9) -
Council 1 March 2023
2.143
Movements between Period 9 and Period 10:
Education Reduction in education expenditure primarily
due to a reduction in employee costs in
relation to industrial action (ref paragraph
4.3).
(0.259)
Page 138

Page 139

Roads &
Neighbourhood
Services
Increase in the cost per tonne for waste
removal.
0.793
Additional income anticipated within Road
Services – Recharges to capital.
(0.251)
Citizens, Culture
& Facilities (CCF)
Additional cost of pay award to WDLT. 0.318
Reduction across services, mainly catering. (0.126)
Requisitions Reduction in requisition payments (22/23
charges paid out of 21/22 and budget set too
high).   
(0.213)
Unearmarked
Covid Funds
Reclassification of education expenditure to
be allocated against Covid Funds. 
(0.242)
All other Services Movement across all other services. (0.164)
Total Movements between Period 9 and Period 10 (0.144)
Revised adverse variance reported to 31 January 2023
(Period 10) 
1.999
Appendix 2 provides more detailed service reports by Chief Officer.
4.2 At its meeting held on 26 October 2022, Council agreed that the allocation of
Residential Care Costs should change from that of a 77.3% HSCP/22.7%
Education split to a 72%/28% split in 2022/23 and on a recurring basis. The
P10 Budgetary Control Report appendices have been updated to reflect this
decision and increases the adverse variance by £1.419m.  
4.3 However, this is partly offset by the reduction in staff costs due to industrial
action in relation to teacher’s pay, which has already taken place.  However,
these P10 figures do not include any further reduction in costs arising from the
two additional strike days (28th February and 1st March). This, when factored
into future budgetary control reports, will reduce the projected overspend by
approximately £0.400m to £1.599m.
4.4 It is worth highlighting that a letter from the Cabinet Secretary for Education
and Skills to the COSLA Spokesperson Children and Young People dated 13
December 2022 stated: 
“In view of the current financial position for 2022-23, I would also welcome a
discussion about how we might fund any additional costs in this financial year
related to teachers’ pay, that may arise from current SNCT negotiations,
including taking into account any pay bill savings that local government might
realise as a result of industrial action by teachers over pay”.
If, it transpires, that the Council needs to use all or some of the staff cost
reduction to fund any in year impact of teachers’ pay, then this will increase
the adverse variance. However, there has been no further correspondence
from the Scottish Government on this issue since the letter dated 13
December.
Page 139

Page 140

4.5 The current adverse variance as shown on appendix 1 is made up of:  
£m
COVID related variance    0.981
Less available COVID funding      (0.981)
Remaining COVID related variance 0.000
Non-COVID variance 1.999
Total variance 1.999
4.6 Information on projected annual variances in excess of £0.050m are
highlighted and noted within Appendix 3, with additional information on action
being taken to minimise or mitigate overspends where possible.
4.7 The pay award for 2022/23 has now been agreed, the current offer and
funding and anticipated spend is reported within the appendices – it is
anticipated that payaward increased the overspend by approximately
£0.900m. The teachers’ pay award has recently been agreed but not yet paid
out.  Officers are currently reviewing the cost implication to the council and the
extent to which this will be funded by the Scottish Government.  
4.8 Agreed management adjustments (Appendix 4) actioned within 2022/23 are
monitored with current indications showing that of the amount being monitored
of £0.276m, £0.251m is on target to be fully achieved.
4.9 A breakdown of the 2022/23 earmarked balances are shown within Appendix
5. This shows that, of the £11.517m brought forward into 2022/23, £7.060m
has already been spent with a further £3.466m projected to be spent by 31
March 2023.  This means that £0.991m is anticipated to be carried forward in
2023/24.
General COVID Reserve
4.10 As at 31 March 2022 the Council carried forward £3.445m for future general
COVID spend. Some of these available funds have been committed, with
£0.100m remaining for future budget pressures.
4.11 On 22 September 2022 UK Government announced that from 6 November
2022 the National Insurance levy (1.25%) which commenced from 1 April
2022 to subsidise Health and Social Care costs will be reversed. The budget
agreed by Members at Council on 9 March 2022 allocated this cost to COVID
monies.  The part year saving from the reversal of this cost has been
deducted from the committed COVID reserve, freeing this back into the
general COVID reserve as noted in the table below:
Committed     
£m 
Free 
£m
Total
£m
Covid balances as at 31 March 2022  2.164  1.281 3.445
Cost of Living Crisis (Council June 2022)  0.600 (0.600) 0
Funding of general Covid spend (P10
BCR) 
0.981 (0.981) 0
NI uplift part year saving (Nov – March)     (0.400)  0.400 0
Balance as at 31 January 2023  3.345  0.100 3.445
Page 140

Page 141

4.12 If the remaining £0.100m of free covid funds are not required by the year end
for any additional purposes, they will be applied against Education
expenditure due to increases in costs of residential care in the same manner
as the £0.242m noted in the table at paragraph 4.1.  This would reduce the
projected year end adverse variance by £0.100m.
Reserves
4.13 At the beginning of the financial year there was £0.380m of unallocated
General Fund Balance (over and above contingency). After taking into
consideration the forecast outturn position at 31 January 2023, the Council is
currently forecast to have £1.619m below the current Prudential Target,
including the effects of the assumed pay award for teachers which is still to be
agreed. However, per the financial regulations, the Council is required to put
in place a recovery action plan to bring reserves back to a level in line with or
above the Prudential target.  Details of the plan were presented to Council on
21 December 2022 as part of a Financial Update paper, where Council
agreed to use the Service Concessionary Financial Flexibility to fund the
Council’s 2022/23 projected overspend, which at that time was £1.5m but has
increased by £0.499m to £1.999m as stated in paragraph 4.1. Furthermore, at
the same meeting, Council agreed to increase the prudential target to 3% of
net expenditure from 2023/24 onwards. The projected levels of reserves held
by the end of 2022/23 are set out in the table below:
£m
Unearmarked Balance as at 31 March 22   3.503
Prudential Target as at 2% of net expenditure
(2022/23)
(3.123)
Unallocated balance (over and above Prudential
Target)
0.380
Current Forecast Outturn for 2022/23 as at 31
January 2023
(1.999)
Balance above/(below) Prudential Target prior to
recovery plan
(1.619)
Remedial action taken:
Allocation of Service Concessionary Financial
Flexibility to fund overspend agreed 21 December
2022
1.999
Projected Unearmarked reserves as at 31/03/23 0.380
Capital
4.14 The current progress on the capital plan is shown in Appendices 6 to 9.
4.15 The overall programme summary report at Appendix 6 shows that planned
2022/23 expenditure is lower than the 2022/23 budget by £35.309m (53.04%
Page 141

Page 142

of budget), made up of £30.488m (45.79% of budget) of project re-profiling,
and an in-year net underspend of £4.820m (7.24% of budget). 
4.16 Appendix 6 also provides an analysis of the overall programme at each alert
status and a summary budgetary control report including detailing the number
of projects and corresponding spend as a percentage of the overall
programme currently at red, amber or green alert status for project life and the
current year.  The current projections are based on best judgement as to how
these projects will continue in operation during the remainder of the year. 
4.17 Appendices 7 and 8 detail the financial analysis of projects at red and green
status respectively (currently no amber) and provide additional information on
action being taken to minimise or mitigate under or overspends where
possible. Appendix 9 provides an analysis of resources. 
4.18 From the analysis within the appendices it can be seen there are a number of
projects with identified re-profiling to date. Those with re-profiling valued at
greater than £0.500m, are listed as follows: 
Project Name
Period 9
Re-
profiling
(£m)
Period
10 Re-
profiling
(£m) 
Movement-
(£m)
Levelling Up Fund (6.835) (6.785) 0.050
District Heating Expansion (3.350) (3.720) (0.370)
Vehicle Replacement (2.217) (2.217) 0
Regeneration Fund (2.333) (2.333) 0
Schools Estate Improvement Plan             (1.940) (1.997) (0.057)
Strathleven House (1.590) (1.590) 0
West Bridgend CC (1.063) (1.063) 0
Vehicle Replacement Strategy (1.000) (1.000) 0
Depot Rationalisation (0.965) (0.965) 0
Regen/Local Econ. Development (0.876) (0.876) 0
Cost of Living Crisis (0.750) (0.750) 0
Clydebank on the Canal (0.657) (0.657) 0
ICT Modernisation (0.521) (0.536) (0.015)
Flood Risk Management 0 (1.257) (1.257)
River Leven Flood Prevention Scheme 0 (0.620) (0.620)
Gruggies Burn Flood Prevention 0 (1.524) (1.524) 
4.19 For comparison purposes, a summary of the monthly re-profiling position is
noted below: 
Page 142

Page 143

Period 9 Period 10 Movement
£m £m £m
Overall capital plan 66.391 66.576 0.185
Overall variance (28.292) (35.309) (7.017)
Re-Profiling (27.148) (30.488) (3.340)
Net over/ under (1.144) (4.820) (3.676)
% Re-Profiling 40.89% 45.79% 4.90%
4.20 The overall movement in re-profiling of £3.340m, shown in the table above, is
almost entirely caused by the need to reprofile £3.401m of various flood
prevention schemes as listed within the table at 4.18 above.
4.21 The overall increase in the net underspend of £3.676m relates mainly to the
decisions agreed by Council (21 December 2022) to reduce or remove
projects from the capital plan.
5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications.
7. Financial and Procurement Implications
7.1 The report notes the projected in-year financial position for both General
Services revenue and capital budgets.
8. Risk Analysis
8.1 The main risks are as follows:
(a) The present variances should be viewed in the knowledge that there are
a number of variable factors which could arise between now and 31
March which could affect the year end results for both the revenue and
capital budgets;
(b) As a consequence of current market conditions, capital receipts may
either not be received or they may be less than anticipated. The budget
assumption is that a significant sum of capital receipts achieved in
2022/23 will be used to fund transformational projects and the principal
and premium repayments within the loan charges budget. Any shortfall in
capital receipts below that budgeted will affect the revenue budget
position. This is being closely monitored and any issues will be reported
to Council;
Page 143

Page 144

(c) As a consequence of current market conditions, inflation is at an all-time
high and interest rates continue to rise. To forecast for the full year costs
budget assumptions have been required (particularly around energy and
interest costs). These assumptions continue to change regularly and
therefore it is likely that the projected year end budgetary position will
change from that reported;
(d) COVID related variances are based upon estimates regarding the likely
annual values and are subject to further review. The cost of COVID
currently projected is based upon a variety of assumptions including:
known available funding; financial flexibilities; ongoing service
restrictions and service demand. These assumptions continue to change
regularly and therefore it is highly likely that the projected year end
budgetary position will change from that reported;
(e) The current pay award for teachers from 1 April 2022 has yet to be
agreed. Any cost beyond the increase assumed in the budget will be
required to be funded.
9. Equalities Impact Assessment (EIA)
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 All services involved in delivering the revenue and capital budgets have been
consulted in the compilation of this report. 
12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council.
__________________
Laurence Slavin
Chief Officer – Resources
Date: 13 March 2023
__________________________________________________________________
Person to Contact: Janine Corr, Accountant
Council Offices, Church Street, Dumbarton
E-mail: janine.corr@west-dunbarton.gov.uk
Page 144

Page 145

Appendices: Appendix 1 - Revenue Budgetary Control 2022/23
– Corporate Summary;
Appendix 2 - Revenue Budgetary Control 2022/23
– Chief Officer Summaries;
Appendix 3 - Analysis of Revenue Variances over
£50,000;
Appendix 4 - Monitoring of Efficiencies
Appendix 5 - Monitoring of Earmarked Balances
Appendix 6 - Overall Capital Programme Summary;
Appendix 7 - Analysis of Projects at Red Status;
Appendix 8 - Analysis of Projects at Green Status;
Appendix 9 - Analysis of Capital Resources.
Background Papers:
• Ledger output – Period 10;
• General Services Revenue Estimates 2022/23
• Review of West Dunbartonshire Council’s Capital
Programme – Council 21 December 2022
• General Services Budget Setting 2023/24 and 2024/25 –
2027/28 Budget Estimates and Council Tax Setting –
Council 1 March 2023
• General Services Capital Plan Update - Council 9 March
2022.
Wards Affected   All Wards
Page 145

Page 146

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2022/23
SUMMARY
PERIOD END DATE 31 January 2023
Total Budget Spend to Date Projected Spend Annual
RAG Status
Net Variance
attributable to
covid*
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
Resources 5,582 8,777 5,691 109 2%  0 109
Regulatory and Regeneration 2,732 3,502 2,963 231 8%  0 231
People & Technology 7,134 5,993 6,976 (158) -2%  0 (158)
Citizens, Culture and Facilities 17,204 15,729 17,171 (33) 0%  91 (124)
Education, Learning and Attainment 110,329 87,426 111,612 1,284 1%  445 839
Roads and Neighbourhood 15,195 22,063 16,778 1,583 10%  0 1,583
5,418 4,984 5,502 84 2%  89 (5)
Supply, Distribution and Property (1,091) 1,659 (948) 143 -13%  47 96
Miscellaneous Services 8,292 6,153 8,504 212 3%  309 (97)
Loan Charges 9,518 8,761 10,513 995 10%  0 995
Capital Receipts used to fund Loan Charges (2,884) (711) (2,884) 0 0%  0 0
Requisition (VJB) 765 649 779 14 2%  0 14
Requisition (SPT) 1,632 1,171 1,405 (227) -14%  0 (227)
Requisition (CJP) 1,694 1,412 1,694 0 0%  0 0
Requisition (HSCP) 81,687 68,073 81,687 0 0%  0 0
Non GAE Allocation (7,328) (6,107) (7,328) 0 0%  0 0
Vacancy Freeze 1,257 0 0 (1,257) -100%  0 (1,257)
Contingency Fund 0 0 0 0 0%  0 0
Total Expenditure 257,137 229,532 260,116 2,980 1.16%  981 1,999
Council Tax (38,126) (28,673) (38,126) - 0%  0 0
Revenue Support Grant/ NDR (211,715) (193,755) (211,715) - 0%  0 0
Additional alternative funding for pay award (2,195) 0 (2,195) - 0%  0 0
Covid Funding (specific and earmarked from 2021/22) (3,367) (2,806) (3,367) - 0%  0 0
Required use of available unearmarked  covid funds 0 0 (981) (981) 0%  (981) 0
Capital Receipts used to fund Transformation (700) 0 (700) - 0%  0 0
Use of Reserves (1,034) (862) (1,034) - 0%  0 0
Total Resources (257,137) (226,096) (258,118) (981) 0%  (981) 0
Net Expenditure (0) 3,437 1,999 1,999 0.78%  0 1,999
Department Summary Variance
Housing and Employability
Page 146

Page 147

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
RESOURCES SUMMARY
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG
Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
112 289 99 (13) -12%  0 (13)
1,431 1,319 1,434 3 0%  0 3
(341) 2,978 (341) 0 0%  0 0
2,177 2,078 2,281 104 5%  0 104
309 242 316 7 2%  0 7
17 (14) 2 (15) -89%  0 (15)
(798) (234) (798) (0) 0%  0 (0)
Central Administration Support 2,675 2,119 2,698 23 1%  0 23
5,582 8,777 5,691 109 2%  0 109Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Variance
Service Summary
Service / Subjective Summary
Finance Business Centre
Audit
Revenues & Benefits
Page 147

Page 148

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
771 630 788 17 0  0 17
659 594 645 (14) (0)  0 (14)
(115) (140) 114- 1 (0)  0 1
766 737 759 (7) (0)  0 (7)
394 513 624 230 1  0 230
Economic Development 256 1,168 261 5 0  0 5
2,732         3,502 2,963 231 0  0 231
Democratic and Registration Service
Legal Services
Licensing
Environmental Health
Planning
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 148

Page 149

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
762 644 769 7 1%  0 7
1,297 990 1,280 (17) -1%  0 (17)
4,571 3,986 4,459 (112) -2%  0 (112)
503 373 468 (35) -7%  0 (35)
7,134 5,993 6,976 (158) -2%  0 (158)
Variance
Total Net Expenditure
Transactional Services
Change Support
Information Services
Human Resources (including risk)
Service / Subjective Summary
Service Summary
Page 149

Page 150

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG
Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
279 213 279 (0) 0%  0 (0)
1,357 1,172 1,439 82 6%  79 3
309 196 283 (27) -9%  0 (27)
Clydebank Town Hall 342 226 367 25 7%  23 2
Libraries 1,811 1,409 1,812 2 0%  (27) 29
Arts and Heritage 346 296 347 1 0%  0 1
Catering Services 4,793 3,954 4,334 (459) -10%  0 (459)
Building Cleaning 1,860 1,776 1,909 49 3%  17 33
Building Cleaning PPP (275) (269) (261) 14 -5%  0 14
Facilities Assistants 2,253 1,761 2,245 (8) 0%  0 (8)
Facilities Management 398 257 332 (66) -17%  0 (66)
Leisure Management 3,642 4,606 3,954 312 9%  0 312
Events 89 131 131 42 47%  0 42
17,204 15,729 17,171 (33) 0%  91 (124)
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy
Page 150

Page 151

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Primary Schools 31,914 25,300 31,025 (889) -3%  0 (889)
Secondary Schools 31,675 25,179 31,300 (374) -1%  0 (374)
Specialist Educational Provision 17,290 14,219 19,935 2,645 15%  445 2,200
Psychological Services 583 428 573 (10) -2%  0 (10)
Sport Development / Active Schools 627 550 627 0 0%  0 0
Early Education 8,864 4,055 8,837 (27) 0%  0 (27)
PPP 15,420 14,981 15,536 116 1%  0 116
Creative Arts 642 470 637 (5) -1%  0 (5)
Curriculum for Excellence 191 41 191 0 0%  0 0
Central Admin 854 802 852 (2) 0%  0 (2)
Workforce CPD 357 267 323 (34) -10%  0 (34)
Performance & Improvement 467 281 366 (101) -22%  0 (101)
Education Development 1,447 853 1,410 (36) -3%  0 (36)
Raising Attainment - Primary 0 0 0 0 0%  0 0
Raising Attainment - Secondary 0 0 0 0 0%  0 0
Pupil Equity Fund (including LAC PEF) 0 0 0 0 0%  0 0
110,329 87,426 111,612 1,284 1%  445 839
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure
Page 151

Page 152

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Transport, Fleet & Maintenance Services (518) 382 (388) 130 -25%  0 130
Roads Services 3,055 2,217 3,041 (14) 0%  0 (14)
Grounds Maintenance & Street Cleaning Client 7,503 6,253 7,503 0 0%  0 0
Outdoor Services 192 195 228 36 19%  0 36
Burial Grounds (193) (457) (179) 14 -7%  0 14
Crematorium (1,026) (752) (934) 92 -9%  0 92
Waste Services 8,165 7,366 9,332 1,167 14%  0 1,167
Depots 0 426 0 0 0%  0 0
Ground Maintenance & Street Cleaning Trading A/c (1,982) 6,433 (1,824) 158 -8%  0 158
15,195 22,063 16,778 1,583 10%  0 1,583
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure
Page 152

Page 153

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net
Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
Working 4 U 3,431 2,970 3,312 (119) -3%  0 (119)
Communities 1,010 824 1,011 1 0%  0 1
Homeless Persons 473 841 736 263 56%  89 174
Private Sector housing 32 0 36 4 13%  0 4
Anti Social Behaviour 472 349 407 (65) -14%  0 (65)
5,418 4,984 5,502 84 2%  89 (5)
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 153

Page 154

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
SUPPLY, DISTRIBUTION AND PROPERTY
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Housing Maintenance Trading A/c (933) (940) (940) (7) 1%  0 (7)
Housing Asset and Investment 46 27 35 (11) -24%  0 (11)
Corporate Assets and Capital Investment Programme (2,277) 82 (2,190) 87 -4%  37 50
Office Accommodation 1,268 1,244 1,351 83 7%  10 72
362 626 361 (1) 0%  0 (1)
(203) (46) (201) 2 -1%  0 2
Private Sector Housing Grants 79 (184) 81 2 3%  0 2
Consultancy Services 567 849 555 (12) -2%  0 (12)
(1,091) 1,659 (948) 143 -13%  47 95
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Corporate Asset Maintenance
Procurement
Page 154

Page 155

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
MISCELLANEOUS
PERIOD END DATE 31 January 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
5,881 4,325 6,170 289 5%  309 (20)
653 513 646 (7) -1%  0 13
510 425 510 0 0%  0 0
1,248 890 1,178 (70) -6%  0 (67)
8,292 6,153 8,504 212 3%  309 (74)
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
European Employability
Service Summary
Sundry Services
Members Allowances, etc
Page 155

Page 156

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
Revenues & Benefits 2,177 2,281 104 5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Planning 394 624 230 58% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Information Services 4,571 4,459 (112) -2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The main reason for the adverse variance is that income is lower than
budgeted due to cancelled or delayed building projects.
People & Technology
This Service provides Building & Planning services
None required at this point.
This service area provides general ICT support to the Council and also
supports transformational change and modernisation of working practices
through technology
Underspend is projected.
Supplies and Services is favourable due to computer licence costs
projected to cost less than budgeted. A favourable variance is also
anticipated for employee cost, printing lease costs, copy costs and
Internal income recharges.
Regulatory and Regeneration
Additional Covid-19 self-isolation grants are being paid by this service with
the cost being offset by additional funding. Vacancies are being covered
by overtime therefore targeted turnover savings not being fully achieved.
In addition a shortfall in funding for the expected pay inflation agreement
is also contributing to the overall adverse variance.
No action is possible at this time.
Overspend is anticipated
Overspend is anticipated
No action is possible at this time.
31 January 2023
Budget Details
Variance Analysis
Variance
The service provided by this area deal with benefits, council tax and debt
recovery.
Resources
Page 156

Page 157

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Catering Services 4,793 4,334 (459) -10% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Facilities Management 398 332 (66) -17% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Leisure Management 3,642 3,954 312 9% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Citizen Services 1,357 1,439 82 6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Additional fee for Pay Award from WDLT.
None required at present
Citizens, Culture and Facilities
Catering Services across WDC
A favourable variance is anticipated in relation to the delay to the free
school meal expansion.
Underspend likely
None required at present
Payment to West Dunbartonshire Leisure Trust for leisure services
This service includes one stop shops and the contact centre
Three call handlers were recruited on 18 month fixed-term contracts to
resolve the telephone issues in the Housing Repairs Contact Centre, the
funding for this is taken from the Scottish Government COVID-19 general
funding.
None required
Overspend is projected; the majority of which will be financed by COVID
funding.
Overspend is projected.
No action is possible at this time.
Vacancies not filled in order to fund pending restructure
Management and Team Leaders for Facilities Services such as Cleaning,
Catering and Facilities Assistants
A  favourable variance is likely.
Page 157

Page 158

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Primary Schools 31,914 31,025 (889) -3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Secondary Schools 31,675 31,300 (374) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area includes all Primary Schools.
The budget was set before the delay to free school meal expansion was
confirmed. As primaries 6 & 7 will now not be covered by universal free
school meal provision from August 2022 income from school meals will be
significantly above the budgeted target income (£225k).  This offsets the
reduction in school lets income (£15k) . There is also a favourable
variance (£665k) against employee costs as the budget was set higher
than expenditure would suggest and reduced expenditure from 3 days
strike action has been recognised
Income from sale of school meals is currently projected to be less than
budgeted (£177k) while income from lets is also lower than expected
(£104k). There is a favourable variance against employee costs caused in
part by reduced expenditure from 3 days strike action.
None necessary
Education , Learning and Attainment
Favourable variance anticipated
None necessary
Favourable variance anticipated
This service area includes all Secondary Schools.
Page 158

Page 159

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Specialist Educational Provision 17,290 19,935 2,645 15% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
PPP 15,420 15,536 116 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Performance & Improvement 467 366 (101) -22% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area covers all ASN Services.
The adverse variance within employee costs (£107k) is due to a
combination of turnover targets not being achieved , a greater than
expected pay award and greater staffing as part of our efforts to minimise
external placements , all reduced partly by reduced expenditure from 3
days strike action. Payments to Other Bodies adverse variance is primarily
due to Council's decision regarding the division of residential costs
between WDC and HSCP exacerbated by the ongoing high demands on
the Residential Placements Budget (£2.367m) - the number of residential
placements is 6% higher (about 2 placements)  than the average for
2021/22.  Day placements are also over budget (£199k) as placements
are on average about 6 greater than last year.
This service covers the monitoring of policies and improvement on
curriculum within Education.
The reason for the favourable variance is the number of vacancies
throughout the year
This service area includes Vale of Leven, Clydebank High and St Peter
the Apostle High Schools and St Eunan's Primary School. The costs
charged to this service are Property costs and the Unitary charge.
The requirement for Residential Placements is demand-led  and decisions
are taken jointly with HSCP following an assessment of the best option for
all concerned. However, the actual usage throughout the year will be
reviewed regularly to identify where there is scope to reduce the number
of placements.
There is an overspend because of the increased pressure over the year
on gas costs (£57k) ,contract cleaning costs (£41k) and possible
payments to BAM for banked hours/change notices (£16k).
None possible
An overspend is anticipated
none necessary
A favourable variance is anticipated
adverse variance anticipated
Page 159

Page 160

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Transport, Fleet & Maintenance
Services (518) (388) 129 -25% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Crematorium (1,026) (934) 92 -9% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Waste Services 8,165 9,332 1,168 14% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Surplus is less than target
none possible at present
Roads and Neighbourhood
This service provides crematorium services within the Council area
Employee costs are higher (£261k) as projected savings from waste route
optimisation ,which depend on operating from a single depot, are not yet
achievable and the impact of the higher pay award . Following a dispute
with the principal  waste removal contractor the agreed increased tonnage
cost has resulted in additional expenditure of £730k. Expenditure on bin
replacements is higher (£53k) , tyres (£46k), skip hire (£16k) ,  waste
transfer consultancy costs (£34k) and SEPA licence charges (£27k) are
greater than anticipated when the budgets were set. Fuel recharges are
also greater than budgeted (£147k). These have been partly offset by
increased income (£83k) and reduced payments to contractors (£94k).
The level of internal recharges is under review
Management will continue to monitor all budget heads with a view to
minimising the overspend
There is an adverse variance ,albeit continuing to decline, against fuel
costs (£111k), which will follow through to higher recharges to services.
Favourable variance from diesel recharges is less than the adverse
variance from higher prices as initial income target was too high. VTU
income remains adverse (£53k) due continuing restrictions on what MOTs
are undertaken.
An adverse variance is anticipated
Transport services across WDC
Gas costs are higher than budgeted (£52k) while income is projected to
be less than budgeted (£27k) . Following the pay award overtime will be
over budget (£12k).
Overspend anticipated
Waste Collection and Refuse disposal services
Page 160

Page 161

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Ground Maintenance & Street Cleaning
Trading A/c (1,982) (1,824) 158 -8% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Working 4 U 3,431 3,312 (119) -3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
None possible at this time
This is the provision of Working 4u service
None Required
Trading operation providing grounds maintenance and street cleaning
services
An adverse variance is anticipated
A year end underspend is anticipated
This variance is due to employee costs being lower due to additional
external funding being used to fund some existing posts .
Housing and Employability
Property costs are adverse due to increased gas/electricity costs (£19k)
and higher anticipated depot costs (£12k). Fuel (£69k) ,  vehicle
maintenance (£22k), tyres (£12k) and plant/seed/materials/tools costs
(£109k) have increased to a level not anticipated when the budget was
set. These have been partly offset by vacancies (£74k).
Page 161

Page 162

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Homeless Persons 473 736 263 56% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Anti Social Behaviour 472 407 (65) -14% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service seeks to prevent homelessness occurring across the
authority and improves access to support services
A year end overspend in anticipated
Most of this variance is due to inflationary pressures which are not
possible to mitigate for since the relevant budget lines are demand led.
The rent charged to DWP for homeless should reflect the cost of
providing the service so it would be expected that these increases would
result in a review of rent to increase in line with cost pressures.  However
due to the recently announced rent freeze this would not be possible until
end of March 2023 at the earliest .
Several issue are causing this overspend , the main issues are as follows
:- Employee costs is expected to overspend as a result of an employee
not being included in budget, and also overtime and agency costs
incurred. The property costs overspend of £204K is mainly due to higher
than budgeted increase in gas and electricity cost ; similarly price of
furniture and white goods have significantly increased causing an adverse
variance  and also increased rental costs of having additional homeless
accommodation to meet expected needs. There has also been difficulties
in having homeless units turned around and ready when required which
has resulted in a forecasted £88K spend on bed and breakfast.  £181K of
the overspend is offset by anticipated additional income based on current
occupancy levels.
None required
A year end underspend in Anti-Social Behaviour Service
A favourable variance is anticipated due to the increased recharge of ASB
posts to HRA following workload analysis.
This is the provision of the anti social behaviour service within the Council
area
Page 162

Page 163

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Office Accommodation 1,268 1,351 83 7% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Corporate Assets and Capital
Investment Programme (2,277) (2,190) 87 -4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Sundry Services 5,881 6,170 289 5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
None required
This service provides asset and estate management
An overall adverse variance is anticipated at this time
Supply, Distribution and Property
Income and expenditure will continue to be monitored throughout the
year.
This service provides the office buildings for the Council.
Rates for NHS24 Aurora House were removed from the 22/23 final budget
but these are included in the rental income so now included in the
projections. Utilities costs high due to price increases.
Overspend projected
Income and expenditure will continue to be monitored throughout the
year.
Miscellaneous
This service area budgets for non departmental specific costs such as
pensions costs, external grants and elderly welfare payments, external
audit fees and insurance costs. The service heading also holds a number
of general savings options which have still to be fully allocated.
The main reason for this variance relates to the general covid spend
which will be required to be funded from unearmarked covid funds.
Promotion of regeneration activities within West Dunbartonshire Council
Income is adverse due to delays in filling staff vacancies on posts that are
budgeted to be internally recharged. While these posts are vacant there is
no possibility of recharging these. This is being partially offset by a
favourable variance in staffing due to the same vacancies.
Page 163

Page 164

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Chief Executive and Chief Officers 1,248 1,178 (70) -6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Loan Charges 9,518 10,513 995 10% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Requisition (SPT) 1,632 1,405 (227) -14% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Vacancy Freeze 1,257 0 (1,257) -100% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This budget includes spend relating to the Senior Management Team of
the Council
Favourable outturn expected.
There are two variances occuring in this service. Employee costs are
showing a small favourable variance due to two short-term Chief Officer
vacancies. In addition there is a large favourable variance due to income
from an unbudgeted staff recharge for the first half of the year which has
now ended.
None required
A favourable variance is anticipated
The adverse variance is linked with forecast on the cost of short term
borrowing with increased interest rates.
Management will continue to monitor and maximise actions taken to
reduce any adverse variance, where possible.
Contribution towards Strathclyde Partnership for Transport
The 22/23 Concessionary Travel Costs having been paid out in 21/22
were not accrued, resulting in an underspend in the current financial year.
None required
Favourable outturn expected.
Other
This budget covers the servicing of the Council's external borrowing
An adverse variance is anticipated
This budget represents the removal of budgeted vacancies from service
departments.
The favourable variance reflects the non filling of vacancies due to the
implementation of recruitment restrictions.
None required
Page 164

Page 165

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 January 2023
Budget Details
Variance Analysis
Variance
Required use of available unearmarked 
covid funds 0 (981) (981) 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This represents the funding from Scottish Government specifically for
covid and additional spend identified outwith specific  Council Services
The variance is funding service related covid costs
Income and expenditure will continue to be monitored throughout the
year.
Any variance will be offset by covid adverse variances within services, or
carried forward for future years allocation against covid costs.
Page 165

Page 166

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2022/23 Appendix 4
Efficiency Detail Chief Officer Area Budgeted
Amount £
Projection of
Total Saved £
Projection of
Total Not Saved
£
Comment
Reduce costs of franking machines Amanda Graham 8,000 - 8,000 Action is underway and an element of this saving is
likely to be achieved by the year end, however not
guaranteed at this stage.
Review Rental Structure for Ashton View Supported
Accommodation Project
Peter Barry 21,000 21,000 -
Reduce costs of storing supply of rock salt Gail McFarlane 44,000 44,000 -
Reduce costs with use of pooled vehicles Gail McFarlane 60,000 60,000 -
Reduce Teacher costs Laura Mason 35,467 35,467 -
Increased income - Housing Maintenance Trading
Account (HMTA) / Corporate Asset Maintenance
(CAMS)
Angela Wilson 108,000 91,000 17,000 The CAMS income is lower than expected due to
reduced programme of work. This will continue to
be monitored and update if the situation changes
276,467 251,467 25,000
Page 166

Page 167

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
MONITORING OF EARMARKED BALANCES 2022/23
Carried forward
into 2022/23 
Spend YTD  Projection of
spend remainder
of year 
Expected to be
carried forward
into 2023/24 
£  £  £  £
Covid General
1 Covid General 3,445,000 3,345,443          99,557 -
Total Covid General - Earmarked 3,445,000 3,345,443 99,557 -
Covid Specific
5 WWF -     Homelessness Funding – from SG Winter Support Fund 55,000 55,000 -
6 Level 4 Welfare/Social Support - increase - from Leaders February 2021 48,000 30,000 18,000 -
7 Addressing Financial Hardship (was Scottish Welfare Fund, 2nd tranche
Top Up) - Financial Insecurity
25,000 25,000 -
8 Parental Employee Support Fund Boost 114,000 - 114,000 -
9 Winter Hardship Fund  food insecurity 125,000 - 125,000 -
10 Tenant Grant Fund ( Winter Hardship homeless) 54,000 54,000 -
11 Free School Meals for Easter 2022 90,500 90,500 -
12 Education Recovery (Additional Teachers) 789,000 657,500 131,500 -
13 Education recovery (ELT) 1,361,000 466,667 333,333 561,000
14 LIPP (Low Income pandemic payment) 80,870 - 80,870 -
15 Scottish Child Payment Bridging Payment per finance circular spring 22 421,867 - 421,867 -
16 Local self isolation assistance 182,000 - 182,000 -
17 General
General spending
17 Change fund  1,257,000 200,222 953,934.66 102,843
18 New apprenticeship fund (bgt 5/3/18) 54,489 21,000 33,489 -
19 CS - Jobs Growth 68,762 - 68,762 -
20 Promotion of voL hospital - committee decision 1,500 1,500 - -
21 Be the best unspent monies (Good Idea Fund) 4,743 - 4,743
22 Budget earmarked - SNP growth items 185,000 154,166.67        30,833 -
23 Barclay Review Implementation: SG Funding for standardised NDR
billing & publication relief recipients
13,112 - 1,975 11,137
24 Library Improvement Fund 12,500 - - 12,500
25 Heritage Centre Display Cases Alexandria Library 7,150 - 7,150 -
26 Building Cleaning 3,500 - 3,500 -
27 Creation of a Scottish Women’s Art Fund 10,000 - 10,000 -
28 W4B Business Awards 13,090 - - 13,090
29 Zero carbon (agreed growth one off 4/3/20 in sundry 20/21 & not used so
carried forward)
38,000 - - 38,000
30 Regulatory -  Econ Development- Business Awards 1,950 - - 1,950
31 Clydebank Blitz Commemoration 3,074 - 3,074 -
32 Community focused activity programme in Alexandria Library 6,000 - 6,000 -
33 Previous provision for equal pay - now earmarked for ongoing HR/Legal
commitments
209,957 98 98 209,761
34 ERO Expenditure - required to be c/f within WDC balance sheet, re VJB 38,750 - 38,750 -
35 Budget commitments 2022/23 (general reserves) 1,034,000 861,666.67        172,333 -
36 SWF  underspend in 21/22 129,217 - 129,217 -
37 DWP/SG monies for various projects 46,174 - 46,174 -
38 Covid (original business grants) 53,903 - 53,903 -
39 Removal of music charges 32,000 - 32,000 -
40 OD & Change Training Budget 70,465 - 70,465 -
41 Automation Team (VKY) 36,362 - - 36,362
42 RRTP underspnd 21/22 67,302 67,302 - -
43 Community empowerment steering group ongoing consultancy work 23,000 23,000 - -
44 Community Grants 60,000 - 60,000 -
45 Parental Employabilty Support Families- Boost (PESF Boost)(B0117) 80,634 8,271 72,363 -
46 Parental Employability Support Fund (PESF)(B0119) 60,650 60,650 - -
47 Underspend WDCVS grants 21/22 44,145 - 44,145 -
48 No one Left Behind 22,206 22,206 - -
49 Young Persons Guarantee 1,018,242 915,467 102,775 -
50 Additional Grafitti work 15,000 - 15,000 -
51 Events Income & spend-Comms & Marketing 4,085 - 4,085 -
TOTAL EARMARKED BALANCES 11,517,200 7,059,660          3,466,153 991,386
Page 167

Page 168

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
PERIOD END DATE
PERIOD 10
Spend to Date Spend to
Date
£000 £000
Red
33 27.7% 10,486 10.4% 33 27.7% 3,854 32.5%
Amber
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Green
86 72.3% 90,064 89.6% 86 72.3% 8,002 67.5%
119 100% 100,550 100% 119 100% 11,856 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Actual
Variance Re-profiling Over/ (Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
92,574 10,486 93,291 717 28,487 3,854 6,176 (22,311) (22,404) 93
0 0 0 0 0 0 0 0 0 0
180,347 90,064 174,538 (5,808) 38,089 8,002 25,091 (12,998) (8,084) (4,913)
272,921 100,550 267,829 (5,091) 66,576 11,856 31,267 (35,309) (30,488) (4,820)
(272,921) (100,550) (267,829) 5,091 (66,576) (11,856) (31,267) 35,309
0 0 0 (0) 0 0 0 0
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 January 2023
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of Projects
at RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at RAG
Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay
to completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Page 168

Page 169

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 9 0 0% 9 0 0%
Current Year Financials 3 0 0% 0 (3) -100%
Project Description
Project Manager Russell Hewton
Chief Officer Russell Hewton
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials 0 3 0% 3 3 0%
Current Year Financials 0 3 0% 3 3 0%
Project Description
Project Manager Russell Hewton
Chief Officer Russell Hewton
Project Lifecycle 31-Mar-23 31-Mar-23
3
Project Life Financials 40 5 12% 40 (0) 0%
Current Year Financials 35 0 0% 0 (35) -100%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 30-Sep-23 30-Sep-23
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Requisition ICT Equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget remains unspent and is likely to be carried forward into FY 2023/2024.
Mitigating Action
Valuation Joint Board - ICT Refresh FY 22/23
Replacement of laptops, monitors and other ICT equipment.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
Replacement of laptops and ICT equipment
None available at this time.
Anticipated Outcome
Requisition of ICT Equipment.
Enhancements to Cash Receipting System
Main Issues / Reason for Variance
Budget was rephased to 2022-2023 as this is a number of mini projects and the first part is the version upgrade which is actively
progressing, currently on phase 2. After this upgrade we can move onto other enhancements which are anticipated to finish in
September 2023. Budget has been reprofiled to FY 2023-2024.
Mitigating Action
None required at this time.
Anticipated Outcome
Enhancements to the cash receipting system including PCI compliant telephone payment system.
Main Issues / Reason for Variance
Replacement of laptops, monitors and other ICT equipment. No further spend anticipated.
To enhance the cash receipting system in the way payments are made and allocated to back
office by increasing the level of security that is required for online payments made by customers
Planned End Date Forecast End Date
Page 169

Page 170

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment4
Project Life Financials 60 6 10% 60 0 0%
Current Year Financials 25 1 6% 3 (22) -88%
Project Description
Project Manager Adrian Gray
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 28-Feb-23
5
Project Life Financials 33 0 0% 33 0 0%
Current Year Financials 33 0 0% 0 (33) -100%
Project Description
Project Manager Alan Douglas
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
6
Project Life Financials 61 3 5% 61 (0) 0%
Current Year Financials 55 0 0% 5 (50) -91%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
Mitigating Action
None possible at this time.
Anticipated Outcome
Development of Agresso system later than originally anticipated but within original budget.
Legal Case Management System
Forecast End Date
Main Issues / Reason for Variance
Budget has been rephased from 2021/22.  The project could not proceed as originally planned as Officers are required to access the
office and hardware the system will run on and COVID-19 restrictions have prevented this.  The project will have to go back out to
tender following the upgrade to Microsoft 365.  The project will not be completed in this financial year. 
Mitigating Action
Legal to discuss impact of Microsoft 365 with ICT.
Agresso development
Planned End Date Forecast End Date
Project to be completed in 2023/24.
Planned End Date
The purpose of this project is to carry out an upgrade of the Agresso Finance System which was
last upgraded in 2015. The requirement to upgrade is to maintain a level of support available from
Unit 4 who have advised that support for older versions of the system is being reduced.
Main Issues / Reason for Variance
Continued issues with server space have hampered progress on data clean-up. ICT working on a solution which will allow some
progress prior to financial year-end however upgrade work will need to be paused while Finance are working on20 22-2023 final
accounts. The project will recommence in summer and need to be carried over to 2023-24 financial year.
Legal Case Management System
Mitigating Action
Opportunities to mitigate are limited at this stage.
Anticipated Outcome
Complete in 2023/24.
Installation of Solar PV at Clydebank Leisure Centre
Installation of Solar PV at Clydebank Leisure Centre.
Planned End Date
Anticipated Outcome
Main Issues / Reason for Variance
Specification delayed due to other priority works. Expect full spend in 2023-2024.
Forecast End Date
Page 170

Page 171

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
7
Project Life Financials 83 0 0% 83 0 0%
Current Year Financials 83 0 0% 5 (78) -94%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
8
Project Life Financials 290 63 22% 290 0 0%
Current Year Financials 216 0 0% 2 (214) -99%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
9
Project Life Financials 16 14 85% 14 (2) -15%
Current Year Financials 2 0 0% 0 (2) -100%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23Planned End Date Forecast End Date
Main Issues / Reason for Variance
All meters complient for water loggers. Budget not required.
Mitigating Action
None required
Water Meter Downsize
Water Meter Downsize.
Anticipated Outcome
Delivery of project within budget.
Anticipated Outcome
Main Issues / Reason for Variance
Existing controls have been found to be obsolete and not compatible with a new AHU controls. Additional timelines and work involved.
Design team established and project specification and tender being compiled. Work will be carried out in 2023/2024.
Mitigating Action
All works to be complete in one tender package.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works are integrated with the new Baths refurbishment. Received and approved initial design proposals from Vital. Waiting on final
design and costings. Works to be complete by 31 March 2023 to compliment the district heating installation.
Mitigating Action
None available at this time.
Replace existing main hall Air Handling unit at Clydebank Town Hall
Replace existing main hall Air Handling unit at Clydebank Town Hall.
Anticipated Outcome
Physical works being carried out by 31/3/23.
Leisure Energy projects - air handling units, upgrade lighting, circulating pumps, and draught proofing
All works to be completed next financial year 2023/24.
Measures to be installed at both Meadow Centre & Vale of Leven Swimming Pool; new pool hall
Air Handling Units, upgrade lighting, circulating pumps Vale of Leven Swimming Pool, internal and
external lighting and draught proofing.
Page 171

Page 172

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
10
Project Life Financials 2,188 462 21% 1,651 (538) -25%
Current Year Financials 1,651 462 28% 775 (876) -53%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-24
11
Project Life Financials 750 0 0% 0 (750) -100%
Current Year Financials 750 0 0% 0 (750) -100%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Dec-22 30-Jun-23
None available at this time.
Anticipated Outcome
Improved town centres and strategic sites across West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Due to factors outwith the Council's control, progress couldn’t be made on a timeline that would be acceptable to funders and as a
result Scottish Government will withdraw the grant offer.
Mitigating Action
None available at this time.
Anticipated Outcome
Viresco Studios and Arts Centre
Viresco Studios and Arts Centre in Alexandria, aimed to encourage wider participation in the arts,
creative enterprises and cultural activity in West Dunbartonshire.
Project will not go ahead.
Regeneration/Local Economic Development
Budget to facilitate the delivery of Regeneration throughout West Dunbartonshire, aligned to the
Economic Strategy. External funding will be sought to maximise opportunities for redevelopment
of these sites.
Forecast End Date
Main Issues / Reason for Variance
LED budget is invested across our town centres and strategic sites and is used to develop and implement projects as well as providing
match funding to lever in external funding. During 2022/2023 the key projects to be developed and delivered include a contribution
towards Smollett Fountain public realm,  development costs associated with Dumbarton Waterfront, the Arc of Attraction Strategy and
in Clydebank implementation of the Development Framework Activity Centre in Clydebank will be delivered in 2023/2024. Many
regeneration projects are subject to factors outwith Council control and close monitoring of the programming is required. Enabling
works at Mitchell Way  have been delayed as they are subject to the timescale of the developer. A contingency is included for
increasing costs and new funding opportunities.
Mitigating Action
Planned End Date
Page 172

Page 173

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment12
Project Life Financials 747 40 5% 747 0 0%
Current Year Financials 747 40 5% 90 (657) -88%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Dec-22 30-Jun-23
13
Project Life Financials 22,213 2,065 9% 22,100 (113) -1%
Current Year Financials 7,465 297 4% 680 (6,785) -91%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-25 31-Mar-25
14
Project Life Financials 11,220 0 0% 11,220 0 0%
Current Year Financials 3,720 0 0% 0 (3,720) -100%
Project Description
Project Manager Craig Jardine
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
Main Issues / Reason for Variance
Kier is appointed to design and deliver the Activities Centre at Clydebank Town Centre. Design of the project is underway and a
commencement date for construction has been confirmed as April 2023. The budget will slip into 2023-2024 however some spend on
design development expected in the current financial year.
There were delays to Connecting Dumbarton (due to procurement issues) and Glencairn House (design development issues) resulting
in reduced projected spend for 2022/2023. A future programme for the Artizan Centre based on the Development Strategy report was
reported to IRED in September 2022. Costs will continue to be monitored by the LUF Project Board.
Mitigating Action
None available at this time.
Anticipated Outcome
Main Issues / Reason for Variance
Network expansion to GJNH (Golden Jubilee National Hospital) will commence pending approval to proceed by the GJNH Board.
Budget to be reprofiled to next financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
New community-run activities centre in Clydebank Town Centre.
Project will be delivered on budget.
District Heating Network Expansion
District Heating Network Expansion.
Planned End Date Forecast End Date
LUF
Year one LUF spend includes acquisition cost of Artizan Centre, and design development for
Glencairn House and Connecting Dumbarton
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Clydebank Can On The Canal
New activities centre in Clydebank Town Centre.
Anticipated Outcome
Mitigating Action
None available at this time.
Redevelopment of the Dumbarton Town Centre
Planned End Date Forecast End Date
Page 173

Page 174

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
15
Project Life Financials 1,590 0 0% 1,590 0 0%
Current Year Financials 1,590 0 0% 0 (1,590) -100%
Project Description
Project Manager Michelle Lynn/ Sarah Christie
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
16
Project Life Financials 8,535 299 4% 8,535 (0) 0%
Current Year Financials 1,715 180 10% 750 (965) -56%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-25 31-Mar-25
17
Project Life Financials 382 388 102% 388 6 2%
Current Year Financials 0 6 0% 6 6 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-21
Mitigating Action
None available at this time.
Anticipated Outcome
New sports changing facility completed.
New Sports Changing Facility at Duntocher
New Sports Changing Facility at Duntocher
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project completed over budget due to ground conditions on site.  Final costs now charged.
Project business case will be brought back to project board, IRED and Council.
Depot Rationalisation
Depot Rationalisation.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Design Team have been appointed to develop feasibility options for the DRP Project, currently in stage 1 of this phase reviewing
service requirements.  The conclusion of the feasibility report will provide input for the options appraisal exercise.  The intention would
be to bring a business case to a future IRED Committee in 2023.
Mitigating Action
None available at this time.
Anticipated Outcome
Main Issues / Reason for Variance
This project is linked to Glencairn House and Depot Rationalisation and will free up the current museum store and office space in
Poplar Road. Opportunities exist to attract external funding. Detailed design work will not commence until Spring 2023.
Mitigating Action
None available at this time.
Anticipated Outcome
Re-development of Strathleven Place
Strathleven Place
Re-development of Strathleven.
Planned End Date Forecast End Date
Page 174

Page 175

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
18
Project Life Financials 2,375 87 4% 2,375 (0) 0%
Current Year Financials 1,090 3 0% 28 (1,063) -97%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-24
19
Project Life Financials 78 0 0% 0 (78) -100%
Current Year Financials 78 0 0% 0 (78) -100%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-23 31-Mar-23
20
Project Life Financials 45 0 0% 0 (45) -100%
Current Year Financials 45 0 0% 0 (45) -100%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-23 31-Mar-23
Main Issues / Reason for Variance
This budget is no longer required.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within budget.
Anticipated Outcome
Project delivered within budget.
Elevated Platforms (Building Services)
Elevated Platforms (Building Services).
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget is no longer required.
Mitigating Action
None available at this time.
Mitigating Action
None available at this time.
Anticipated Outcome
New build community facility.
Purchase of 3 Welfare Units
The purchase of 3 Welfare Units as a spend-to-save proposal.
New Westbridgend Community Centre
New Westbridgend Community Centre
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Various delays due to Covid and other utility issues. Planning was previously delayed but now resolved. Building warrant applications
submitted and tender to be issued. Anticipated to be onsite by April 2023.
Page 175

Page 176

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
21
Project Life Financials 400 47 12% 222 (178) -44%
Current Year Financials 357 3 1% 100 (257) -72%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Oct-23 31-Oct-23
22
Project Life Financials 2,712 4,075 150% 4,266 1,555 57%
Current Year Financials 910 1,708 188% 1,900 990 109%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
Posties Park Sports Hub - New sports hub to include gym & running track
Creation of a sports hub at Posties/Marinecraft to include a new changing pavilion/Gym, new all-
weather 6 lane running track, conversion of blaze sports pitch to grass, new fencing, upgrade of
existing floodlights and additional car parking.  This combines the budget approved by the Council
in February 2015 for Community Sports Facilities at Posties Park, draw down of budget from the
generic sports facilities budget line.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project start was delayed due to planning issues and COVID-19 restrictions. Work commenced January 2021 with a proposed
completion date of March 2022 which has been extended to May 2023 due to design changes required by Planning. There is still a
significant amount of work to be undertaken to complete the project and the cost of this work has been affected by Covid, Brexit and
supply chain issues. Additional budget will be required to complete this project.
Mitigating Action
None required at this time.
Anticipated Outcome
New all weather running track and gymnasium.
Anticipated Outcome
Two new allotment sites with 80 plots and community growing space.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Two sites are being developed at Dillichip Loan Bonhill and Overburn Dumbarton. These sites will provide eighty traditional allotment
plots together with community food growing facilities. It is anticipated that project works will commence in June 2023 with a completion
date of October 2023. This project has successfully attracted £0.1 from Scottish Government Vacant and Derelict Land Fund. As
agreed at Council on 22 December 2022 the budget has been reduced by £178k.
Mitigating Action
None available at this time.
Allotment Development
To develop an allotment site.
Page 176

Page 177

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment23
Project Life Financials 817 286 35% 817 (0) 0%
Current Year Financials 553 23 4% 150 (403) -73%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
24
Project Life Financials 217 3 1% 217 0 0%
Current Year Financials 214 0 0% 0 (214) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
25
Project Life Financials 400 358 90% 400 0 0%
Current Year Financials 42 0 0% 0 (42) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Main Issues / Reason for Variance
Main Issues / Reason for Variance
Project is now being developed for tendering, with project commencing May 2023 and completion expected by 31 March 2024.  It is
anticipated that £0.150m will be spent this financial year mainly on consultant costs and enabling works.
Mitigating Action
None available at this time.
Anticipated Outcome
Extension to existing cemetery providing a sustainable burial environment.
Vale of Leven Cemetery Extension
Extension of existing cemetery in Vale of Leven.
Planned End Date Forecast End Date
Anticipated Outcome
To improve journey times and reliability of bus services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Officers working with external partners to identify projects to support funding. Investigation on going however unlikely works will be
able to progress this financial year.
Mitigating Action
None required at this time.
Bus Rapid Deployment Fund
Funding has been awarded from Sustrans to assist with social distancing measures required as a
result of the COVID-19 pandemic.
Auld Street Clydebank - Bond
Completion of roadworks associated with Auld Street housing development. Creation of a footpath
to Golden Jubilee Hospital.
Planned End Date Forecast End Date
To complete remaining civil works required.
Road construction works completed in previous years. Remaining funds are insufficient to complete footpath construction. Works on
hold until such time as additional funds can be secured.
Mitigating Action
None available at this time.
Anticipated Outcome
Page 177

Page 178

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment26
Project Life Financials 12 17 134% 17 4 34%
Current Year Financials 12 17 134% 17 4 34%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
27
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 0 (1,000) -100%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
Main Issues / Reason for Variance
Budget will be used for any service work carried out by Scottish Power before or after column replacement works.
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Street lighting and associated electrical infrastructure
WDC is responsible for the maintenance of 18,000 street lighting columns and associated
illuminated signs and bollards.  This budget is required for this infrastructure.
Planned End Date Forecast End Date
Vehicle Replacement Strategy
Replacement of refuse collection vehicles.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Larger vehicles will be delayed due to supply chain issues. Delivery timescales anticipated at 18 months.
Mitigating Action
None available.
Anticipated Outcome
Replacement of refuse collection vehicles.
Page 178

Page 179

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment28
Project Life Financials 2,817 460 16% 2,817 0 0%
Current Year Financials 2,817 460 16% 600 (2,217) -79%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
29
Project Life Financials 1,980 0 0% 1,980 0 0%
Current Year Financials 180 0 0% 45 (135) -75%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Vehicle Replacement
Replacement of vehicles which have reached end of programmed lifespan (7 year heavy vehicles,
10 year light vehicles).
Anticipated Outcome
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Vehicles are being ordered for delivery in this financial year but larger vehicles will be delayed into financial year 2023/2024.
Mitigating Action
None Required.
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within budget.
Waste Transfer Station
The design, development and construction of a recycling and bulk waste transfer facility that will
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultant project nearing completion and spend will be made thereafter.
Replacement of fleet within budget.
Page 179

Page 180

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment30
Project Life Financials 29,450 659 2% 29,450 (0) 0%
Current Year Financials 2,797 563 20% 800 (1,997) -71%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-26 31-Mar-26
31
Project Life Financials 750 638 85% 750 0 0%
Current Year Financials 113 1 1% 0 (113) -100%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
Schools Estate Improvement Plan - next Phase - Faifley Campus
Improvement of Schools Estate.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The next phase of the Schools Estate Improvement Plan involves the development of a new Campus provision in the Faifley area.
WDC has been successful in securing funding from the Scottish Government Learning Estate Improvement Programme. SFT
confirmed the indicative funding allocation for this project at £18.416m on the 4 May 2021, this will be received as a revenue stream
over the 25 years of the Scottish Government financial support (subject to the Council adhering to the funding criteria). Site Options
Appraisal has taken place and Members approved the recommendation to proceed with the new Faifley Campus on the St Joseph's
site at Education Committee on 9th June 2021.  The design team and main contractor have been appointed and the next phase will
see the design development for the new Campus taking place. The statutory consultation process was launched in September 2021
and a report was brought back to the Educational Services committee in March 2022 concluding the process. RIBA Stage 2 Design
development slightly behind programme but this will not have an impact on the overall Phase 1 completion date for the project.
Mitigating Action
None available at this time.
Forecast End Date
Main Issues / Reason for Variance
A new contractor has been appointed and looking at the programme of works.
Mitigating Action
None available at this time.
Delivery of the project will be on time.
Anticipated Outcome
Anticipated Outcome
Project delivered on budget.
Planned End Date
Choices Programme - to assist young people who require additional support
Bringing together Central Support Services which will include relocation of Choices Programme.
Page 180

Page 181

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment32
Project Life Financials 924 0 0% 924 0 0%
Current Year Financials 154 0 0% 40 (114) -74%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
33
Project Life Financials 379 42 11% 425 46 12%
Current Year Financials 0 0 0% 46 46 0%
Project Description
Project Manager Arun Menon
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-30 31-Mar-30
Mitigating Action
None available at this time
Main Issues / Reason for Variance
Work continues on developments resulting in some spend in the current year.
Mitigating Action
None required.
Anticipated Outcome
Development of Workforce Management System.
Development of Workforce Management System
Project to develop the Workforce Management System.
Planned End Date Forecast End Date
Community Alarm upgrade
To upgrade Community Alarm
Planned End Date
Anticipated Outcome
Forecast End Date
Main Issues / Reason for Variance
Work is ongoing with HR colleagues in order to appoint a project manager to this post and it is anticipated that spend will progress in
the final half of the financial year.
Community Alarm Upgrade
Page 181

Page 182

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 30 10 33% 20 (10) -33%
Current Year Financials 30 10 33% 16 (14) -47%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-24 31-Mar-24
2
Project Life Financials 50 43 86% 51 1 1%
Current Year Financials 7 0 0% 8 1 10%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
3
Project Life Financials 5 0 0% 5 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Jackie Nicol Thomson
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
IFRS 16 Database
This is a system which will ensure that WDC has the correct level of information and adheres to correct
reporting of IFRS16 - Leasing. 
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The purchase of software to allow new accounting treatment of leases to be appropriately reported is on track. Full spend anticipated FY
2022/2023.
Mitigating Action
None required
Anticipated Outcome
Purchase of software for accounting for leases.
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
Payment Card Industry Data Security Standard (PCIDSS)
Module would ensure that WDC were compliant with the current requirements of PCIDSS for card payments
without the need for numerous costly workarounds
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget was rephased to 2022-2023 as version upgrade of the Council's cash receipting system is required beforehand and is currently
underway. The Module for this has been secured and anticipated timescales for Go Live is May 2023. Initial project meeting has taken place and
system installed in test, work in progress to test and sign off by May 2023. As agreed at Council on 21 December 2023 this budget has been
Anticipated Outcome
Upgraded Electronic Insurance System.
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Upgraded version with PCI compliant telephone payment system.
Electronic Insurance System
Acquisition of a claims/incident management system supported by an electronic document management
system.
Main Issues / Reason for Variance
The various claim forms and departmental reports have been reviewed and updated and the relevant online request forms were submitted to the
Digital Sub-Group to be converted to Online Achieve Forms.  The various claim forms and departmental reports have now been converted to
Online Achieve Forms and are in the process of being tested. Once complete, the supplier will take matters forward with their design team. An
anticipated timeline for completion of the project, taking into account the various stages i.e. development, testing, going live etc. will be drawn up
in conjunction with the supplier at that time.  Budget spend anticipated in 2022/23.
Mitigating Action
None required at this time.
Page 182

Page 183

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
4
Project Life Financials 1,000 141 14% 1,000 0 0%
Current Year Financials 1,000 141 14% 250 (750) -75%
Project Description
Project Manager Gillian McNeilly
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
5
Project Life Financials 53 13 25% 53 0 0%
Current Year Financials 33 0 0% 33 0 0%
Project Description
Project Manager Alan Douglas
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
6
Project Life Financials 30 10 33% 30 0 0%
Current Year Financials 10 10 100% 10 0 0%
Project Description
Project Manager Pamela Clifford
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Preservation of Historic Site.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment Scotland) Rediscovering the Antonine Wall
project.
Mitigating Action
None Required.
Re -imagine Antonine Wall 
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment
Scotland) Rediscovering the Antonine Wall project which is also funded by the Heritage Lottery Fund.
Trainee solicitor in place. Budget will be fully spent.
Mitigating Action
None required at this time.
Anticipated Outcome
Solicitor support for Capital Projects, with full budget spend anticipated.
Cost of Living
To support Council and community organisations with capital costs for cost of living initiatives.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Working Group currently developing proposals for initiative. The budget will be spread equally over four years and £0.75m has been rephased.
Mitigating Action
None required
Anticipated Outcome
Initialive will assist with cost of living crisis
Main Issues / Reason for Variance
Solicitor Project Support for Capital Projects
Solicitor costs to directly support capital projects
Planned End Date Forecast End Date
Page 183

Page 184

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
7
Project Life Financials 155 0 0% 155 0 0%
Current Year Financials 155 0 0% 155 0 0%
Project Description
Project Manager Pamela Clifford
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
8
Project Life Financials 342 238 69% 347 5 1%
Current Year Financials 110 1 1% 1 (109) -99%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
9
Project Life Financials 20 14 69% 20 0 0%
Current Year Financials 7 1 9% 7 0 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required.
Anticipated Outcome
Delivery of project with full budget spend.
Replace failed heating controls/valves & recommission
Replace failed heating controls/valves & recommission.
Planned End Date Actual End Date
Main Issues / Reason for Variance
Further works ordered. Expect full spend by 31 March 2023.
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress beyond committed expenditure.
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Replace obsolete boilers (plant greater than 30 years old).
Replace obsolete boilers (plant greater than 30 years old).
Planned End Date Forecast End Date
Demolition 215 Main Street Alexandria
Demolition of 215 Main Street Alexandria.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Emergency works carried out to former St Andrews Church resulting in complete demoliton to remove a dangerous structure. Budget was agreed
by special powers.
Mitigating Action
None Required.
Anticipated Outcome
Demolition of unsafe building
Page 184

Page 185

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
10
Project Life Financials 80 21 27% 50 (30) -37%
Current Year Financials 61 3 4% 10 (51) -84%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
11
Project Life Financials 85 55 64% 55 (30) -36%
Current Year Financials 30 0 0% 0 (30) -100%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Automatic Meter Readers - Water
Automatic Meter Readers.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress beyond committed expenditure.
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022 once committed projects have been completed.
Energy Projects quick wins
Spend to Save projects.
Planned End Date Forecast End Date
Page 185

Page 186

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
12
Project Life Financials 344 86 25% 101 (243) -71%
Current Year Financials 258 0 0% 15 (243) -94%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
13
Project Life Financials 160 0 0% 28 (132) -83%
Current Year Financials 152 0 0% 20 (132) -87%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
14
Project Life Financials 50 9 18% 9 (41) -82%
Current Year Financials 50 9 18% 9 (41) -82%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Main Issues / Reason for Variance
Forecast End Date
Lighting upgrades to LED in schools and Corporate buildings
Upgrade lighting in schools and corporate buildings.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Upgrade obsolete heating controls (BEMS) across Council estate
Upgrade obsolete heating controls (BEMS) across Council estate.
Planned End Date
Zero Carbon Fund
Zero Carbon Fund.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
None required.
Page 186

Page 187

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
15
Project Life Financials 9,982 4,987 50% 9,997 15 0%
Current Year Financials 2,423 89 4% 90 (2,333) -96%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
16
Project Life Financials 1,166 1,166 100% 1,166 0 0%
Current Year Financials 143 143 100% 143 0 0%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
17
Project Life Financials 1,456 780 54% 1,456 0 0%
Current Year Financials 1,317 641 49% 991 (326) -25%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Progress towards delivery of planned projects from Economic Development Strategy and Charrette Action Plans albeit later than originally
anticipated.
Town Centre Fund
Scottish Government funding to help improve local town centres.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The remaining Town Centre Fund will be spent on the Smollett Fountain public realm works which will be completed by the end of the financial
year.
Mitigating Action
None available at this time.
Anticipated Outcome
Regenerated Town Centres.
Mitigating Action
Programme involves  expenditure over a number of projects led by different services. Regular reporting between services will help early
identification of risk.
Anticipated Outcome
Place-based improvements that advance Scottish Government's priorities of 20 minute neighbourhoods and carbon zero.
Place Based Investment Programme
Scottish Government Funding to establish a Place-Based Investment Programme to ensure that all place
based investments are shaped by the needs and aspirations of local communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The budget includes a £0.641m contribution to Titan Boulevard at Queens Quay and £0.676m towards implementation of Alexandria Masterplan
projects.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The remaining Regeneration Fund projects are Dumbarton Waterfront Path; the contribution towards the costs of Glencairn House; Connecting
Dumbarton; and the Scottish Marine Technology Park at the former Carless site. As Levelling Up Fund is programmed to be spent before
Regeneration Fund for Glencairn House and Connecting Dumbarton, it is not anticipated that any Regeneration Fund will be spent on these
projects during this financial year and will be carried forward. Spend against The £2.0m Clyde Mission funding for SMTP will continue during the
financial year 2022/2023 before an agreement is reached on the £2.0m of Regeneration Fund investment. Dumbarton Waterfront Path will be
developed according to landowner timescales, and there is no spend anticipated in 22/23.
Mitigating Action
Programme management approach to delivery.
Regeneration Fund
Funding to implement major regeneration projects linked to community charrettes. 
Page 187

Page 188

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
18
Project Life Financials 125 99 79% 125 0 0%
Current Year Financials 69 42 62% 69 0 0%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 30-Jun-23
19
Project Life Financials 34,050 2,908 9% 34,049 (1) 0%
Current Year Financials 986 228 23% 1,304 318 32%
Project Description
Project Manager Patricia Rowley/ Craig Jardine
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-27 31-Mar-27
20
Project Life Financials 15 4 24% 4 (11) -76%
Current Year Financials 11 0 0% 0 (11) -100%
Project Description
Project Manager Stephen Daly
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
None required.
Mitigating Action
None required.
Anticipated Outcome
Delivery of the project on time and within the increased budget.
Telephone System Upgrade
To improve Housing Repairs telephone platform for incoming calls, providing improved Management
Information.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Regular updates are provided at every Council meeting and monthly Project Board meetings and to City Deal.  The main issues contained within
the new Council's approved Outline Business Case are still valid, which include Exxon's remediation strategy, land transfer arrangements and
issues relating to adjoining owners.  WDC Consultants are monitoring the remediation process to ensure compliance with specification, also
Esso are independently monitoring the remediation works.  Final Business Case submission is June 2023. Through the Scape framework we are
working closely with Balfour Beatty to achieve a formal pre construction agreement to allow the detailed design works to commence and the full
construction programme to be developed. Agreements in principle are progressing with third party land owners.
Levelling Up
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and
transformational regeneration.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This capacity funding was awarded by UK Government to assist with development of LUF bids. WDC has been awarded a grant from LUF
Round 1 and the capacity funding will be used in part to produce Artizan Centre redevelopment options. The balance will be used for
Roads/Transportation to develop a major transportation bid for LUF2.
Mitigating Action
None available at this time.
Anticipated Outcome
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and transformational regeneration.
Exxon City Deal
As part of the City Deal project the WDC Exxon site at Bowling regeneration with alternative A82 route
included.
Page 188

Page 189

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
21
Project Life Financials 421 300 71% 421 (0) 0%
Current Year Financials 91 71 77% 71 (21) -22%
Project Description
Project Manager David Main
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
22
Project Life Financials 3,998 1,353 34% 4,010 13 0%
Current Year Financials 1,673 166 10% 1,672 (1) 0%
Project Description
Project Manager Sarah Christie/Michelle Lynn
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
23
Project Life Financials 40 0 0% 0 (40) -100%
Current Year Financials 40 0 0% 0 (40) -100%
Project Description
Project Manager John Anderson
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Alexandria Community Centre Sports Hall re-flooring
Alexandria Community Centre Sports Hall re-flooring
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Heritage Capital Fund
Heritage Capital Fund.
Main Issues / Reason for Variance
Work is underway to progress furniture replacement at Dumbarton, Duntocher and Parkhall libraries during 2022/2023.  Budget has been
rephased to next financial year for Dalmuir library as work is currently scheduled for 2023/2024.
Mitigating Action
None required.
Anticipated Outcome
Project carried forward to align with Asset Management programme.
Anticipated Outcome
Project to be delivered on budget and within revised timescale.
Planned End Date Forecast End Date
None available at this time.
Transformation of Infrastructure Libraries and Museums
To improve performance and efficiency of Council's Libraries and Cultural Services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The original projected spend has been affected by internal and external delays due to the Covid 19 recovery, a reduction in the scope of the
Clydebank Town Hall project, a change in the delivery date for the Clydebank Museum at Clydebank Library during the contract award stage,
while the new Dalmuir Library and Gallery had to be rescheduled for approval in August 2021. Officers are now making progress to get projects
back on track, projects will still be delivered in full, and a review of optimism bias will be undertaken in the projections for 2022/23. As agreed at
Council on 21 December 2022 the budget has been reducd and the project will not ncontinue beyond 2022/23.
Mitigating Action
Page 189

Page 190

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
24
Project Life Financials 1,912 1,984 104% 1,912 0 0%
Current Year Financials 1,912 1,984 104% 1,984 73 4%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-23 31-Mar-23
25
Project Life Financials 350 9 3% 350 0 0%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-24 31-Mar-24
26
Project Life Financials 150 16 11% 150 0 0%
Current Year Financials 134 0 0% 134 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-23
Anticipated Outcome
To deliver new sports changing facility.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project had been delayed due to a number of COVID-19 related issues and utilities issues.  Unit is now in production but delay to site due to the
utility disconnection and demolition works. Demolition works complete and waiting for a date for installation.
Mitigating Action
None available at this time.
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
Main Issues / Reason for Variance
The budget for this project has been rephased to FY 2023/2024.
Mitigating Action
None available at this time.
Anticipated Outcome
To deliver new sports changing facility.
Anticipated Outcome
Full budget spend anticipated.
New Sports Changing Facility Dumbarton West (Old OLSP site) 
New Sports Changing Facility Dumbarton West (Old OLSP site) 
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing.
Mitigating Action
None available at this time.
Building Upgrades and H&S - lifecycle & reactive building upgrades
Lifecycle and reactive building upgrades.
Page 190

Page 191

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
27
Project Life Financials 750 750 100% 750 0 0%
Current Year Financials 86 86 100% 86 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
28
Project Life Financials 150 0 0% 0 (150) -100%
Current Year Financials 150 0 0% 0 (150) -100%
Project Description
Project Manager Michelle Lynn
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-25 31-Mar-25
29
Project Life Financials 912 832 91% 912 0 0%
Current Year Financials 80 35 44% 80 0 0%
Project Description
Project Manager Elaine Troup
Chief Officer Peter Barry
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required at this time.
Anticipated Outcome
Full spend is anticipated on this year's budget.
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve coordinated
service delivery in response to community need. This is complimented by community capacity building,
empowering WD citizens to do more for their own communities (leading to less reliance on council).  Also
included is the implementation of participatory budgeting to support and build capacity in communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application process is planned for later in this financial year.
Changing Places Toilet Provision
Changing places toilet provision in various public buildings.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Main Issues / Reason for Variance
Project now complete.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered on budget.
Holm Park & Yoker Athletic FC
Develop a new 3G pitch to act as a home venue for Clydebank FC with extensive community access.
Planned End Date Forecast End Date
Page 191

Page 192

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
30
Project Life Financials 100 27 27% 87 (13) -13%
Current Year Financials 17 4 25% 4 (13) -75%
Project Description
Project Manager Graham Watters
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
31
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 50 0 0% 50 0 0%
Project Description
Project Manager John Kerr
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
32
Project Life Financials 405 37 9% 405 0 0%
Current Year Financials 405 37 9% 405 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required at this time.
Anticipated Outcome
Better access with parks, cemeteries and open spaces.
Public non-adopted paths and roads
Upgrades to drainage and lighting to enhance the lifespan of paths and roads within  facilities in public parks,
cemeteries and civic spaces.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects are currently being developed to deliver better access in our parks, cemeteries and open spaces. Full budget spend anticipated in
2022/2023.
Main Issues / Reason for Variance
The Council is currently trying to secure new funding to provide new accommodation within the Dennystoun Forge site. This may require some
redesign of the existing site and has resulted in proposed works to provide additional play and security measures being held until future design
proposals are confirmed.
Mitigating Action
Officers carried out some proactive consultative work to establish the tenant priorities this will allow the work programme to be developed
timeously.
Anticipated Outcome
It is expected the works programme  will be completed during 2022/2023.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Dennystoun Forge Site Improvements
Dennystoun Forge Site Improvements
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
None required.
Integrated Housing Management System
Development of IHMS system.
Page 192

Page 193

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
33
Project Life Financials 1,726 1,724 100% 1,726 0 0%
Current Year Financials 13 11 83% 13 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
34
Project Life Financials 50 37 73% 50 (0) 0%
Current Year Financials 13 0 0% 13 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
35
Project Life Financials 220 214 97% 220 0 0%
Current Year Financials 7 0 0% 7 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 03-Apr-21 31-Mar-22
Anticipated Outcome
Improvements to the environment of West Dunbartonshire.
Kilmaronock Cemetery Extension
Extension of existing cemetery at Kilmaronock. 
Planned End Date Actual End Date
Anticipated Outcome
Sustainable burial environment for local residents.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Mitigating Action
None required at this time.
Environmental Improvement Fund
This fund has been created to deliver environmental improvement projects for communities throughout West
Dunbartonshire.
Planned End Date Forecast End Date
This budget will be used to develop an area of the existing Cemetery for additional burials.  Project scope has now been developed and will be
tendered under the minor civils framework.  Budget spend anticipated in 2022/2023.
Mitigating Action
None required at this time.
Anticipated Outcome
New all weather tennis courts.
Project works complete.  Retentions to be paid in 2022/2023.
Mitigating Action
None required at this time.
Main Issues / Reason for Variance
Sports Facilities Upgrades - Argyll Park - Construction of 3 All Weather Tennis Courts
Project is part of wider investment in sporting facilities and is dependent on match funding from Sports
Scotland. Agreement in principle to wider WDC strategic priorities.
Main Issues / Reason for Variance
Remaining budget rephased from 2021/2022 to progress with tree planting in 2022/2023 in line with the Councils Climate Change and
Biodiversity action plans.  Full budget spend anticipated.
Page 193

Page 194

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
36
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
37
Project Life Financials 1,444 59 4% 1,444 (0) 0%
Current Year Financials 201 0 0% 201 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
38
Project Life Financials 210 0 0% 210 0 0%
Current Year Financials 10 0 0% 10 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 30-Nov-23 30-Nov-23
Development of play areas to improve accessibility and inclusiveness of play areas throughout West Dunbartonshire. Projects are being
developed for implementation over the next five years.
Mitigating Action
None required at this time.
Anticipated Outcome
Renewal of play parks
East End Park Resurfacing
Resurfacing of 3G pitch at East End Park.
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Play Parks Grant Funding
Renew and replace play park equipment
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultant and design team fees for resurfacing of 3G pitch at East End Park.
Mitigating Action
None required.
Anticipated Outcome
Resurfacing of 3G pitch at East End Park.
Balloch Mountain Bike Track
Develop a mountain bike skills trail at Balloch Castle Country Park.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Design fees to develop Mountain bike skills trail in Balloch country park. Application will be submitted to Sport Scotland for match funding. Project
to commence April 2023 and works to be complete by November 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Mountain bike track
Page 194

Page 195

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
39
Project Life Financials 25 19 75% 25 0 0%
Current Year Financials 25 19 75% 25 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
40
Project Life Financials 228 55 24% 228 0 0%
Current Year Financials 228 55 24% 228 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
41
Project Life Financials 740 350 47% 350 (390) -53%
Current Year Financials 390 0 0% 0 (390) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Jul-22 31-Jul-22
Nature Restoration Fund
Spaces for People
Mitigating Action
None required at this time.
Planned End Date
Anticipated Outcome
To provide people of West Dunbartonshire additional space to help adhere to social distancing guidelines.
Supply and install extra large litter bins as a pilot project within hotspot problem areas. Project has commenced and completion is anticipated by
March 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Nature resource for Faifley Community
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Large bins provided for high traffic areas
Nature resource for Faifley Community
Large bins for high traffic areas (pilot)
Supply and install extra large litter bins as a pilot project within hotspot problem areas.
Planned End Date Forecast End Date
Funding has been awarded from Sustrans to assist with social distancing measures required as a result of
the COVID-19 pandemic.
Funding received from Nature Restoration Fund to build nature resource for Faifley community has been completed and additional funding has
been received and projects are currently being developed and to be delivered by March 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Main Issues / Reason for Variance
Forecast End Date
Main Issues / Reason for Variance
The programme is now complete and there will be no further expenditure.
Page 195

Page 196

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
42
Project Life Financials 683 6 1% 572 (110) -16%
Current Year Financials 683 6 1% 400 (283) -41%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
43
Project Life Financials 203 0 0% 107 (96) -47%
Current Year Financials 107 0 0% 0 (107) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
44
Project Life Financials 200 0 0% 5 (195) -97%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget to be used for retention payment from last years surfacing of Dumbarton East footways.
Mitigating Action
None required at this time.
Forecast End Date
Main Issues / Reason for Variance
Projects and locations still to be decided.
Main Issues / Reason for Variance
To develop projects including Balloch Cycle Way (Pier Road to Mollanbowie/Boturich Road), and other projects principally around National Cycle
Network 7 including Angus Street/Bonhill Bridge and Atlus Street/Cart Street, Clydebank and pedestrian dropped kerbs.
Mitigating Action
None required at this time.
Anticipated Outcome
To improve connectivity and enhanced Cycling routes within West Dunbartonshire.
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Mitigating Action
None required at this time.
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Additional Pavement Improvements
Extra funding to accelerate pavement maintenance and improvements across West Dunbartonshire.
Footways/Cycle Path Upgrades
Renewal and/or enhancement of failed footpaths/cycle paths through West Dunbartonshire.
Planned End Date
Cycling, Walking and Safer Streets
Introduction of enhanced walking routes and traffic calming schemes to introduce safer streets within West
Dunbartonshire.
Planned End Date Forecast End Date
Page 196

Page 197

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
45
Project Life Financials 60 55 91% 60 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
46
Project Life Financials 314 215 68% 314 (0) 0%
Current Year Financials 100 0 0% 100 (0) 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
47
Project Life Financials 1,257 0 0% 1,257 0 0%
Current Year Financials 1,257 0 0% 0 (1,257) -100%
Project Description
Project Manager Raymond Walsh/ Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Turnberry Homes - traffic calming/ management at Turnberry housing development off Castle Road
Mitigating Action
Funding has been received from Turnberry Homes and will be used to introduce traffic calming and traffic
management measures to mitigate the impact of additional traffic accessing the housing development off
Castle Road, Dumbarton.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultation completed 2021/2022 and speed humps will be installed prior to 31 March 2023.
None required at this time.
Anticipated Outcome
Traffic calming to be installed in Dumbarton East.
Electrical Charging Points - Rapid Charge
Funding has been awarded from Transport Scotland for the Installation of electrical charging points
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Main Issues / Reason for Variance
A detailed design for Gruggies Burn will be undertaken by the end of the financial year.
Mitigating Action
None required at this time.
Anticipated Outcome
Project should be complete within budget.
Anticipated Outcome
To provide Electric Vehicle Charging points within West Dunbartonshire.
Flood Risk Management
Enhancement of drainage infrastructure to ensure compliance with Flood Risk Management Act 2009.
Planned End Date Forecast End Date
Charging points to be installed at Moss O' Balloch park by the end of this financial year.
Mitigating Action
None required at this time.
Page 197

Page 198

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
48
Project Life Financials 500 0 0% 500 0 0%
Current Year Financials 500 0 0% 500 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
49
Project Life Financials 149 37 25% 149 0 0%
Current Year Financials 149 37 25% 110 (39) -26%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
50
Project Life Financials 800 181 23% 800 0 0%
Current Year Financials 620 0 0% 0 (620) -100%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
Infrastructure - Flooding
Essential renewal of failed drainage assets to minimise flood risk within West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Small value projects to tackle flooding events in various areas.
Main Issues / Reason for Variance
Plans are under consideration by officers and will be submitted to Elected Members for approval.
Mitigating Action
None required at this time.
Anticipated Outcome
Projects should be complete within budget.
Flood Prevention
Various flood prevention projects.
Forecast End Date
Anticipated Outcome
Project should be completed within budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date
Awaiting outcome of Scottish Government & SEPA deliberations.
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Intention is to complete works within budget.
River Leven Flood Prevention Scheme
River Leven Flood Prevention Scheme.
Page 198

Page 199

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
51
Project Life Financials 1,627 64 4% 1,075 (552) -34%
Current Year Financials 1,627 64 4% 1,075 (552) -34%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
52
Project Life Financials 500 11 2% 280 (220) -44%
Current Year Financials 220 0 0% 0 (220) -100%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
53
Project Life Financials 3,444 288 8% 3,444 0 0%
Current Year Financials 3,444 288 8% 3,444 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23Planned End Date Forecast End Date
Main Issues / Reason for Variance
Roads Operations are progressing an extensive surfacing program and have a number of schemes to be completed by the end of the financial
year.
Mitigating Action
None required at this time.
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Infrastructure - Roads
Infrastructure - Roads.
Mandatory 20mph Residential communities
Main Issues / Reason for Variance
Anticipated Outcome
Intention is to complete various surfacing works by the end of March 2023.
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements & Park and Rides
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements.
Mandatory 20mph Residential communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Work will be undertaken during this financial year for A8014 Kilbowie Road, Balloch Station Park and Ride and Bus Infrastructure Improvements.
A814 Congestion measures contractor arrived on site mid-August. Works are progressing well and completion expected by the end of February
2023. The budget for Balloch Station will be used for consultancy works and planning application fees.
Mitigating Action
None required at this time.
Anticipated Outcome
Improve accessibility to Public Transport and improve journey time reliability.
Planned End Date Forecast End Date
Page 199

Page 200

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
54
Project Life Financials 97 35 36% 97 (0) 0%
Current Year Financials 55 0 0% 0 (55) -100%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
55
Project Life Financials 15,053 429 3% 15,053 (0) 0%
Current Year Financials 1,524 8 1% 0 (1,524) -100%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
56
Project Life Financials 2,325 1,007 43% 2,325 0 0%
Current Year Financials 693 0 0% 693 (0) 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
57
Project Life Financials 2,325 0 0% 2,325 0 0%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
Main Issues / Reason for Variance
These works are not due to commence until Phase 1 has been completed.
Main Issues / Reason for Variance
Plans have been developed for carriageway widening and footway and cycleway construction between Strathleven and Lions Gate.  There are
ongoing discussions with Aggreko and other land owners in regards to access and land acquisition with construction commencing during
2022/2023.
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
Anticipated Outcome
Project should be completed within budget.
A813 Road Improvement Phase 1
A813 Road Improvement Phase 1.
Planned End Date Forecast End Date
None available at this time.
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Gruggies Burn Flood Prevention
Commission of Gruggies Flood Prevention Scheme.
Depot Improvement Works
Improvement of WDC Roads Depot.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget will be utilised for depot rationalisation works during the financial year.
A813 Road Improvement Phase 2
A813 Road Improvement Phase 2.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget to be used for a detailed design for Gruggies Burn.
Mitigating Action
Page 200

Page 201

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
58
Project Life Financials 4,300 4,029 94% 4,300 (0) 0%
Current Year Financials 498 227 46% 498 (0) 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
59
Project Life Financials 3,930 3,846 98% 3,846 (84) -2%
Current Year Financials 84 0 0% 0 (84) -100%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-May-21
60
Project Life Financials 1,039 651 63% 1,039 (0) 0%
Current Year Financials 117 8 7% 0 (117) -100%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
To upgrade bridges within West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works substantially complete. Additional works as a compensation event started on Wallace street in July 2022.
Mitigating Action
Works to Renton footbridge are now complete and work will commence on the other bridges.
Mitigating Action
None available at this time.
Anticipated Outcome
Mitigating Action
None required.
Anticipated Outcome
To provide an improved Lomond Bridge.
Protective overcoating to 4 over bridges River Leven
To overcoat 4 bridges over River Leven.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Anticipated Outcome
Project should be completed within budget enhancing the A814 through Clydebank.
A811 Lomond Bridge
Clydebank Charrette, A814
Clydebank Charrette, A814
Upgrade of Lomond Bridge.
Planned End Date Actual End Date
None required at this time.
Main Issues / Reason for Variance
Works to Lomond Bridge were completed May 2021. No further costs expected.
Page 201

Page 202

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
61
Project Life Financials 80 0 0% 80 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
62
Project Life Financials 350 0 0% 0 (350) -100%
Current Year Financials 350 0 0% 0 (350) -100%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
63
Project Life Financials 300 153 51% 300 0 0%
Current Year Financials 300 153 51% 300 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
To purchase equipment.
Traffic Signal Upgrades
Upgrade Traffic Signals
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Forecast End Date
Main Issues / Reason for Variance
New Plant to be purchased
Roads Plant
Mitigating Action
None required.
Anticipated Outcome
Purchase of Roads plant and equipment.
Planned End Date
These will be included in LUF2 and we await Scottish Government decision on application.
Mitigating Action
None required.
Anticipated Outcome
To upgrade traffic signals.
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Footway Resurfacing (RAMP)
Footway resurfacing
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Page 202

Page 203

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
64
Project Life Financials 1,000 0 0% 0 (1,000) -100%
Current Year Financials 1,000 0 0% 0 (1,000) -100%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
65
Project Life Financials 100 0 0% 0 (100) -100%
Current Year Financials 100 0 0% 0 (100) -100%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
66
Project Life Financials 1,000 0 0% 0 (1,000) -100%
Current Year Financials 1,000 0 0% 0 (1,000) -100%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
Project will be removed as agreed at Council on 21st December 2022.
Pavement improvements
Various pavement improvement projects.
None required.
Anticipated Outcome
Various road improvement projects
Planned End Date Forecast End Date
None required.
Anticipated Outcome
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
Project will be removed as agreed at Council on 21st December 2022.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
Street sign renewal
Renewal of street signs
Roads improvements
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Mitigating Action
None required.
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
Page 203

Page 204

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
67
Project Life Financials 30 0 0% 0 (30) -100%
Current Year Financials 30 0 0% 0 (30) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
68
Project Life Financials 400 0 0% 400 0 0%
Current Year Financials 400 0 0% 400 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
69
Project Life Financials 160 71 44% 160 0 0%
Current Year Financials 80 71 88% 80 0 0%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
70
Project Life Financials 1,110 244 22% 1,110 (0) 0%
Current Year Financials 441 56 13% 441 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-29 31-Mar-29
Forecast End Date
Water Safety
Mitigating Action
None required.
To develop Water Safety Policy & enhance water safety equipment in WDC
Planned End Date
Anticipated Outcome
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Compactors have now been delivered.
Mitigating Action
None Required.
Replacement of compactors at Dalmoak civic amenity site
The purchase of 2 compactors for the Council civic amenity site at Dalmoak.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Anticipated Outcome
Purchase of gritters
Purchase of gritters.
Project will be removed as agreed at Council on 21st December 2022.
Main Issues / Reason for Variance
Delivery delayed by the supplier. Full budget spend expected before the end of the financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within  budget.
AV Equipment - Education
Purchase of AV Equipment for Education.
Planned End Date
Although there is re-profiling of budget caused mainly by the academic year starting several months after the financial year the project is still on
track to be completed by the planned end date.
Mitigating Action
None available at this time.
Anticipated Outcome
Forecast End Date
Project delivered within  budget.
Purchase of AV Equipment for Education.
Page 204

Page 205

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
71
Project Life Financials 376 335 89% 376 (0) 0%
Current Year Financials 41 0 0% 41 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
72
Project Life Financials 20,241 15,280 75% 20,241 0 0%
Current Year Financials 1,005 464 46% 1,005 0 0%
Project Description
Project Manager Sharon Jump/ Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
73
Project Life Financials 694 472 68% 694 0 0%
Current Year Financials 504 283 56% 504 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
Free School Meals
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within amended timescales.
Provision of Capital Funding from Scottish Government to implement free school meal initiative.
Planned End Date
Anticipated Outcome
Project delivered within budget and to the revised programme, following COVID-19.
Forecast End Date
None required
Mitigating Action
None required at this time.
Anticipated Outcome
Increase the Chromebook ratio for most disadvantaged children.
Main Issues / Reason for Variance
Project is complete other than snagging works which can only be completed when school is closed however project end date is still on target.
Additional budget required in relation to electrical phasing which was unknown at the time of project inception.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renton Campus: The overall construction is programmed to complete by 25 July 2022. (Previously April 2022 but re-programmed due to 13
week COVID-19 site closure).  Phase 1 of the project was handed over on Monday 18 October 2021, with pupils returning to the new school
campus on Wednesday 20 October 2021.  Phase 2 on schedule to be handed over 25th July 2022. There is an acceleration of spend due to part
retention being paid 2022/2023.   St Mary's:  anticipated commencement of MUGA is September 2022 which means new build kitchen will slip to
June 2023.  Pitch onsite September and dining hall will be July 2023 as cannot be onsite at the same time as pitch works.   Additional ASN
Provision: temporary accommodation for Choices will be in place by September and plans for rebuild extension ongoing. Additional scoping in
respect of vacant space at Choices and former Riverside ELC ongoing.  Skills School: scoping ongoing.  Balloch Campus, Lomond Base,
artificial grass installation is complete.
Mitigating Action
Digital Inclusion
Increase the ratio of chrome book devices for most disadvantaged children and families and support for
families with remote access.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Additional devices have been ordered to increase the ratio of devices to pupils as part of a commitment towards a 1:1 device ratio. The project is
on track to be fully spent in 2022/2023.
Schools Estate Improvement Plan
Improvement of Schools Estate.
Page 205

Page 206

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
74
Project Life Financials 5,508 5,508 100% 5,508 (0) 0%
Current Year Financials 3 3 98% 3 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 30-Apr-22
75
Project Life Financials 8,748 8,490 97% 8,822 74 1%
Current Year Financials 795 464 58% 795 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
76
Project Life Financials 1,150 1,145 100% 1,150 (0) 0%
Current Year Financials 26 20 79% 26 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 30-Apr-22
Mitigating Action
None required.
Anticipated Outcome
Project delivered on time and within budget
Schools Estate Refurbishment Plan
Completion of condition surveys has been carried out to identify works required to bring various schools from
Condition C to Condition B.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete and final account to be agreed.
Mitigating Action
None required.
Mitigating Action
None required at this time.
Anticipated Outcome
Dalmonach CE Centre
To create new community facilities with additional space for early years provisions.
Early Years Early Learning and Childcare Funding
Early learning and childcare funding awarded to West Dunbartonshire Council to facilitate the expansion in
entitlement to funded ELCC to 1140 hours from August 2020.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing and budget spend anticipated in 2022/2023.
Anticipated Outcome
To create new community facilities with additional space for early years provisions.
The project will be completed to deliver the requirements of the Early Years expansion plans.
Main Issues / Reason for Variance
Project complete and await final charges.
Page 206

Page 207

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
77
Project Life Financials 1,053 616 59% 1,053 0 0%
Current Year Financials 1,053 616 59% 969 (84) -8%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
78
Project Life Financials 1,400 0 0% 1,120 (280) -20%
Current Year Financials 280 0 0% 0 (280) -100%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
79
Project Life Financials 73 53 73% 73 0 0%
Current Year Financials 73 53 73% 73 0 0%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
Planned End Date Forecast End Date
None available at this time
Anticipated Outcome
Renovation of Unit 11 Levenside Business Court
Main Issues / Reason for Variance
Mitigating Action
None available at this time
Anticipated Outcome
Project will be removed as agreed at Council on 21st December 2022.
The construction of an office and storage refit with a mezzanine floor within an existing workshop unit which will include associated finishes
works and electrical installations. The multi-purpose new office space will accommodate two members of staff with an office base and allow
space to set up a training facility indoors. Project expected to be completed by 31 March 2023.
Replacement of Care First
Replacement of Care First
Main Issues / Reason for Variance
As agreed at Council on 21st Decemember 2022 this project will no longer progress and therefore no further spend will occur.
Criminal Justice Adaptations
Renovation of Unit 11 Levenside Business Court.
Planned End Date Forecast End Date
None available at this time
Anticipated Outcome
Provision of adaptations and equipment to HSCP clients as anticipated.
Aids & Adaptations - Special Needs Adaptations & Equipment
Reactive budget to provide adaptations and equipment for HSCP clients.
Planned End Date Forecast End Date
Provision of aids and adaptations to clients as required.
Mitigating Action
Main Issues / Reason for Variance
Page 207

Page 208

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
80
Project Life Financials 27,531 27,272 99% 27,531 0 0%
Current Year Financials 61 61 100% 61 0 0%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-22 31-Mar-22
81
Project Life Financials 1,422 676 48% 1,422 0 0%
Current Year Financials 1,422 676 48% 886 (536) -38%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
82
Project Life Financials 60 50 83% 60 0 0%
Current Year Financials 17 7 40% 17 0 0%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Oct-22 31-Oct-22
Internet of Things Asset Tracking
Asset Tracking.
Mitigating Action
None available at this time.
Anticipated Outcome
Technical aspect of the project is complete and WDC assisting with user testing. Delayed but on budget.
Anticipated Outcome
Most of the capital allocated to HSCP (approx £500k) will be used to review/replace the current case management systems and will be rephased
in line with the project plan. Supply chain delays may continue to impact delivery and spend.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete with a slight overspend due to additional works required in relation to roof vents which required to be installed. Acceleration of
budget has been requested in relation to an overspend in the current year.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Mobile phone replacements continue but many are on hold due to dependency on ITune module of Microsoft 365.  Assessing the next volume of
Chromebook replacements and continuing to liaise with Education.
Mitigating Action
Continue to escalate and meet framework suppliers to confirm delivery lead times.
Investigate other procurement routes as well as adjust the project scope to replace where stock allows.
Mitigating Action
The statement of final account has been signed and financial risk exposure should be reduced through efforts to dispose of the existing
properties at the earliest opportunity.
Anticipated Outcome
Dumbarton Care Home opened 2017.  Clydebank Care Home was certified complete on 9 November 2020.
ICT Modernisation
This budget is to facilitate ICT infrastructure and modernise working practices.
Replace Elderly Care Homes and Day Care Centres
Design and construction of replacement elderly care homes and day care centres in Dumbarton and
Clydebank areas.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Technical aspect of the project is complete and WDC are assisting with user testing. Delayed but on budget. This is funded by Scottish
Government budget.
Page 208

Page 209

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
83
Project Life Financials 1,297 532 41% 1,297 0 0%
Current Year Financials 1,297 532 41% 950 (347) -27%
Project Description
Project Manager Brian Miller/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
84
Project Life Financials 450 256 57% 450 0 0%
Current Year Financials 173 78 45% 120 (53) -31%
Project Description
Project Manager Dorota Piotrowicz/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 30-Sep-23 30-Sep-23
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Storage Area Network (SAN) installation ongoing. Server replacement at procurement stage. Wi-Fi access equipment scoping for end of life
items and estimated potential £0.300m spend to replace up to 900 - 1000 wireless access points.  Planning procurement for secondary storage
(data domains) underway and estimated £0.150m spend. Indications are that global supply chain issues will impact Wi-Fi and storage lead times.
Mitigating Action
Monitor supply chain issues. Continue tendering processes and implementation stages for each project.
Majority of budget spent but delayed.
Project services to delivery Microsoft 365 Implementation including 3rd party supplier, training, technical
consultancy etc.
Planned End Date Forecast End Date
Anticipated Outcome
Anticipated Outcome
Anticipate two thirds of the budget being spent this financial year due to supply chain issues. Additionally, some works are planned for the last
quarter of the year for Public Sector Network (PSN) annual compliance submission.
365 Implementation
Main Issues / Reason for Variance
Project spend relates to internal and external resources to implement new systems, processes and user training skills. Mailbox migration aspect
of the project now being resumed as cloud backup solution is in place. Implementation of device management functionality in 365 is live for
corporate devices but full rollout is linked to mailbox migrations. Information governance work stream in progress. Project resourcing issues
continue due to competing demands and competitive environment for recruitment.
Mitigating Action
Continue to monitor the various work streams to accelerate aspects of the project where possible if suppliers can provide resource. Continue to
assess where a) internal skills have developed, b) external resource is needed for introducing new functionality in the future to inform future
bidding cycles and c) temporary recruitment/secondment is required.
ICT Security & DR
The project is for the enhancement of security systems, server replacement and the update of corporate
applications to ensure compliance with 15/16 PSN requirements, to enhance the disaster recovery
capabilities of WDC.
Page 209

Page 210

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details
Project Life Financials
Spend to Date Variance
85
Project Life Financials 77 77 100% 77 0 0%
Current Year Financials 30 30 100% 30 (0) 0%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-25 31-Mar-25
86
Project Life Financials 3,502 101 3% 3,502 0 0%
Current Year Financials 3,502 101 3% 3,502 0 0%
Project Description
Project Manager N/A
Chief Officer N/A
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required.
Anticipated Outcome
Direct project support costs allocated as appropriate.
Direct Project Support
Business support cost such as reallocation of architects and project support at year end.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Salary Capitalisation in 2022/2023.
None required.
Anticipated Outcome
Completion of project by 2025
Session Initial Protocol (SIP) project Swan Trunking
This project is to replace legacy Analogue Telephony infastructure with new Digital Telephony infrastructure
due to the phasing out of the Legacy infrastructue by 2025
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This project to replace legacy Analogue Telephony infastructure with new Digital Telephony infrastructure has just started and will continue until
2025.
Mitigating Action
Page 210

Page 211

WEST DUNBARTONSHIRE COUNCIL APPENDIX 9
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (141) (99) 70% (419) (278) 197%
Current Year Financials (790) 0 0% (790) 0 0%
Project Description
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials (75,127) (33,462) 45% (76,371) (1,244) 2%
Current Year Financials (5,574) (4,605) 83% (5,574) 0 0%
Project Description
Project Lifecycle 31-Mar-30 31-Mar-30
3
Project Life Financials (35,184) (4,831) 14% (35,184) 0 0%
Current Year Financials (959) (252) 26% (959) 0 0%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
4
Project Life Financials (12,001) (6,835) 57% (14,501) (2,500) 21%
Current Year Financials (5,038) (3,096) 61% (4,416) 622 -12%
Project Description
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Match funding received.
None required.
Mitigating Action
Mitigating actions are detailed within the appropriate status updates.
Anticipated Outcome
Application of resources as appropriate.
Match Funding / Other Grants and Contributions
Match Funding / Other Grants and Contributions
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application of resources is dependent on capital project progressing in year as planned.
Mitigating Action
Application of resources is dependent on capital project progressing in year as planned.
Main Issues / Reason for Variance
General services capital grant is anticipated to be received as forecast.
Mitigating Action
None required at this time
Anticipated Outcome
General services capital grant is anticipated to be received as forecast.
Ring Fenced Government Grant Funding
This is ring fenced grant funding which is primarily anticipated to be received from the Scottish Government and
relates to Cycling, Walking, Safer Streets, Regeneration Placed Based Investment Programme, Early Years,
Gruggies Burn Flood works, Early Years funding, City Deal and Town Centre Fund.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Application of resources held on balance sheet as at 31 March 2022 as appropriate.
General Services Capital Grant
This is a general grant received from the Scottish Government in relation to General Services capital spend
Application of resources is dependent on capital project progressing in year as planned.
Spend to Date Forecast Variance
Resources Carried Forward
These are resources that have been received in previous years relating to Turnberry Homes, Town Centre Fund
Grant, Digital Inclusion, Clydebank Can on the Canal, Internet of Things Asset Tracking and Auld Street Bond.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
31 January 2023
Budget Details
Project Life Financials
Page 211

Page 212

WEST DUNBARTONSHIRE COUNCIL APPENDIX 9
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
Spend to Date Forecast Variance
Resources Carried Forward
31 January 2023
Budget Details
Project Life Financials
5
Project Life Financials (25,429) (77) 0% (26,506) (1,077) 4%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
6
Project Life Financials (124,889) (55,245) 44% (114,745) 10,144 -8%
Current Year Financials (54,112) (3,903) 7% (19,425) 34,687 -64%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
7
Project Life Financials (150) 0 0% (103) 47 0%
Current Year Financials (103) 0 0% (103) 0 0%
Project Description
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
CFCR applied to relevant capital project.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renovation of Unit 11 Levenside Business Court
Mitigating Action
None required at this time.
This is capital spend which is funded by revenue budgets
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved for the purposes of
funding capital expenditure
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery therefore mitigating action is detailed in the red and amber analysis.
Mitigating Action
None available at this time.
Anticipated Outcome
While prudential borrowing requirement is likely to be less than budgeted in the current financial year this is anticipated to catch up over the
programme life.
CFCR
Capital receipts received.
Capital Receipts
These are capital receipts that are anticipated from sales of land and buildings both as part of the normal disposal
programme and also as part of the business case investment in office rationalisation, new school building and new
care home development
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Receipts budgets are based on assumptions in relation to the sale of various sites. Not all sales will be realised this financial year. The main ones
being OLSP, St James retail park, Dalreoch Care Home. Queen's Quay, Levenbank Terrace, Heather Avenue, Crosslet House. As agreed at
Council receipts received are used firstly to pay for principle and premiums.
Mitigating Action
While market conditions are out with officers control all potential receipts will be explored.
Anticipated Outcome
Page 212

Page 213

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Council: 29 March 2023
___________________________________________________________________
Subject: Housing Revenue Account Budgetary Control Report
to 31 January 2023 (Period 10)
1. Purpose
1.1 The purpose of the report is to provide members with an update on the
financial performance to 31 January 2023 (Period 10) of the HRA revenue
and capital budgets for 2022/23.
2. Recommendations
2.1 Members are asked to:
i) note the revenue analysis shows projected adverse variances of
£2.253m however this will be offset by reducing the contribution from
revenue to capital (CFCR) therefore netting to a revenue break even
position ; and
ii) note the net projected annual position in relation to the capital plan is
highlighting an in-year adverse variance of £27.242m (41.53%) which is
made up of re-profiling of £31.671m (48.28%) and overspend of
£4.429m (6.75%) as detailed in Appendix 4.
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2022/23 and a total budget of £47.018m.
Capital
3.2 At the meeting of Council on 9 March 2022, Members also agreed the
updated Capital Plan for 2022/23 which has been augmented by re-profiling
and from 2021/22 and budget adjustment to produce a total planned spend for
2021/22 of £65.604m.
4. Main Issues
Revenue
4.1  The budgetary position for HRA Revenue is provided in Appendix 1 with
information on projected variances valued at more than £0.050m being
provided as Appendix 2.This shows a net break even position which is made
ITEM 14
Page 213

Page 214

up of projected adverse variances of £2.253m, offset by reducing the
contribution from revenue to capital (CFCR) by the same amount therefore
netting to a revenue break even position.
Due to the spend reprofiling shown below in Capital (4.3), the CFCR which is
budgeted in HRA revenue can be reduced without any concerns around the
ability to fund the Capital spend in 2022/23.
Capital 
4.2 The HRA capital summary position is shown in Appendix 3. Information on
projects that are highlighted as being within the Red category is provided in
Appendix 4 and Appendix 5 provides information on the projects at Green. A
summary of anticipated resources is shown in Appendix 6. The analysis
shows that there is currently a projected in-year adverse variance of
£27.242m. 
4.3 From the analysis within the appendices it can be seen that the projects with
forecast material slippage, as listed as follows:
Project Name Slippage (£m)
Doors/window component renewals 1.500
Roof Coverings 2.255
Affordable Housing Supply Programme 27.673
Reasons for slippage are explained in Appendix 4.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year.  This can
affect all service areas.
Page 214

Page 215

8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of both Housing management and Legal services have been
requested on this report and both have advised there are neither any issues
nor concerns with the proposal.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer – Resources
Date: 22 February 2023
___________________________________________________________________
Person to Contact: Janice Rainey - Business Unit Finance Partner (HEED),
16 Church Street, Dumbarton, G82 1QL,     
telephone: 01389 737704, e-mail janice.rainey@west-
dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue) 
Appendix 3 - Budgetary Position (Capital)
Appendix 4 - Variance analysis Red Projects (Capital)
Appendix 5 - Variance analysis Green Projects (Capital)
Appendix 6 - Resources (Capital)
Appendix 7 - Analysis of Affordable Housing Supply 
Programme (Capital)
Background Papers: None
Wards Affected: All
Page 215

Page 216

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2022/23
PERIOD END DATE
Subjective Summary
Total Budget
2022/23 
£000
Spend to
Date
2022/23 
£000
Forecast
Spend
£000
Annual RAG
Status
Employee Costs 6,690 5,363 6,899 209 3% 
Property Costs 2,030 1,412 1,967 (63) -3% 
Transport Costs 112 92 140 28 0% 
Supplies, Services And Admin 395 186 328 (67) -17% 
Support Services 2,724 1,742 2,613 (111) -4% 
Other Expenditure 532 695 788 256 48% 
Repairs & Maintenance 12,942 11,133 13,867 925 7% 
Bad Debt Provision 1,060 803 963 (97) -9% 
Void Loss (Council Tax/Lost Rents) 857 1,804 2,172 1,315 153% 
Loan Charges 12,175 9,232 12,309 134 1% 
CFCR 7,501 3,936 5,248 (2,253) -30% 
Total Expenditure 47,018 36,397 47,294 276 1% 
House Rents 45,215 36,296 45,402 (187) 0% 
Lockup Rents 210 161 207 3 1% 
Factoring/Insurance Charges 1,316 1,085 1,302 14 1% 
Other rents 115 85 116 (1) -1% 
Interest on Revenue Balance 55 25 30 25 45% 
Transfer from Reserves 0 0 100 (100) 0% 
Miscellaneous income 107 46 137 (30) -28% 
Total Income 47,018 37,698 47,294 (276) -1% 
Net Expenditure 0 (1,301) (0) (0) 
Forecast Variance 2022/23
£000               %
31 January 2023
Page 216

Page 217

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 January 2023
PERIOD 10
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
EMPLOYEE COSTS 6,690 6,899 209 3% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
PROPERTY COSTS 2,030 1,967 (63) -3% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
SUPPLIES, SERVICES AND ADMIN 395 328 (67) -17% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers all employees charged directly to the HRA including caretakers.
Variance Narrative
This adverse variance is mainly due to the agreed pay award being higher than the 2%
budgeted . Also £60K of this adverse variance relates to the increased pay awarded to
caretakers  following  job evaluation panel on 7 April.  This £60K is offset by a transfer from
HRA service improvement reserve which is shown in the income section .
A year end overspend is anticipated
It is not possible to mitigate against an agreed pay award however managers will continue
to review any possible reductions in costs where possible to try and partially offset some of
this
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers electricity, gas, rates, rents, cleaning  and insurance costs.
Variance Narrative
A favourable variance is expected due to the revised probable calculations for utilities,
based on 21/22 actual outturn plus required inflation rates.
A year end underspend is anticipated
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers computer supplies & equipment, telephones, printing, postages and tenant participation costs.
Variance Narrative
A favourable variance is forecast due to the expectation that the ICT computer software
recharge for 22/23 will be similar to the 21/22 recharge, which was lower than 22/23 budget,
resulting in a projected favourable variance.  Tenant Participation costs are also expected
to be under budget based on the trend of the spend year to date.
A year end underspend is anticipated
Page 217

Page 218

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 January 2023
PERIOD 10
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
SUPPORT SERVICES 2,724 2,613 (111) -4% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
REPAIRS & MAINTENANCE 12,942 13,867 925 7% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
BAD DEBT PROVISION 1,060 963 (97) -9% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Budget Details Variance Analysis
A favourable variance is expected with the assumption that the 2022/23 forecast outturn for
support services is expected  to be in line with the 2021/22 outturn adjusted for pay uplifts
etc. This charge is calculated each year end based on HRA's percentage usage of the total
cost of WDC support services. The 2022/23 HRA budget was set before this 2021/22
outturn was known so was based on 2020/21 charge which was higher.
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Budget Details Variance Analysis
Subjective Analysis forecast Variance
This budget covers central support recharges to the HRA
Subjective Analysis forecast Variance
The adverse  variance within Repairs & Maintenance is due to additional work being carried
out to catch up with both jobbing  repairs and void repairs. Additional capacity to do this has
been achieved through use of sub contractors as well as continuing with HMTA work so in
effect more than a typical year worth of work is expected to be completed in 2022/23,
therefore the cost will be higher than usual.
Variance Narrative
Variance Narrative
This budget covers all repair and maintenance expenditure to houses and lockups
Subjective Description
A year end underspend is anticipated
A year end overspend is anticipated
A year end underspend is anticipated
In order to get back  to pre - COVID levels of voids and repairs , it is considered necessary
to pursue this increased activity for 2022/23 albeit at a financial cost . It should be noted
that in previous years, costs were lower than budgeted due to lower activity in lockdown /
COVID restrictions .
Variance Narrative
The Bad Debt Provision expected to be required for 2022/23 is less than estimated at time
of budget setting, resulting in a favourable variance. This assumes that the provision
required in 2022/23  will be similar to the 2021/22 provision.
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Service Description
This budget allows for the provision for bad and doubtful debts to be maintained at an appropriate level
Page 218

Page 219

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 January 2023
PERIOD 10
VOID LOSS 857 2,172 1,315 153% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
LOAN CHARGES 12,175 12,309 134 1% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
CFCR 7,501 5,248 (2,253) -30% 
Main Issues
Mitigating Action
Anticipated Outcome
Variance Narrative
The main reason for the projected adverse variance relates to the number of void properties
being higher than expected at time of budget setting. The budget was set on the
assumption that backlogs following COVID delays  in getting voids turned around would be
resolved early in year however the  numbers continue to be high .
A void working group has been reviewing the issues and have been implementing actions
and working with Housing Maintenance managers to improve the situation and it is
expected that the void figures will start to decrease significantly over the next few months.
This budget covers the rents lost on void houses and lockups and the cost of council tax on void properties.
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
A year end underspend is anticipated
Service Description
This budget covers the contribution from revenue to Capital
Variance Narrative
In order to offset the cost pressures on the revenue HRA in 2022/23 , it will be necessary to
reduce the contribution to Capital to allow the HRA account to break even. Due to a large
part of the planned Capital spend on new builds being reprofiled into 2023/24 this reduced
contribution will not create any issues for the remaining Capital programs being delivered in
2022/23.
None available
Budget Details Variance Analysis
A year end overspend is anticipated
Variance Narrative
The main reason for this varaince is the due to interest payments being higher than
anticipated at time of budget setting.
None available
A year end oversend is anticipated
Subjective Analysis forecast Variance
Service Description
Loan Charges is made up of repayments of principle sums, and the payments of interest and expenses
Page 219

Page 220

APPENDIX 3
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 10
Spend to
Date Spend to Date
£000 £000
Red
12 44.4% 14,107 64.2% 12 44.4% 14,107 64.1%
Amber
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Green
15 55.6% 7,875            35.8% 15 55.6% 7,912                35.9%
27 100% 21,982 100% 27 100% 22,019 100%
Budget Spend to
Date
Forecast
Spend Forecast Variance Budget Spend to Date Forecast
Spend
Forecast
Variance Reprofiled Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
166,246 14,107 170,855 4,609 53,876 14,107 26,815 (27,062) (31,671) 4,609
0 0 0 0 0 0 0 0 0 0
49,874 7,875 49,694 (181) 11,727 7,912 11,547 (181) 0 (181)
216,120 21,982 220,549 4,429 65,604 22,019 38,361 (27,242) (31,671) 4,429
216,120 21,982 220,549 (4,429) 65,604 22,019 38,361 27,242
0 0 0 0 0 0 0 0
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 January 2023
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at RAG
Status
Red
Projects are forecast to be overspent and/or experience material delay
to completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Page 220

Page 221

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,266 703 31% 2,635 369 16%
Current Year Financials 431 703 163% 800 369 86%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 271 6 2% 271 0 0%
Current Year Financials 185 6 3% 94 (91) -49%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials 192 0 0% 192 0 0%
Current Year Financials 192 0 0% 0 (192) -100%
Project Description
Project Lifecycle 31-Mar-23 31-Mar-24
Main Issues / Reason for Variance
The GAA have still to publish their Noise Insulation Scheme which was scheduled for Autumn 2022, the scheme would detail
funding arrangements for those properties both commercial and residential that fall within the scope of the scheme.  The delay to
the publication has negated the opportunity to commence this project in 22/23.  Officers are pressing the GAA for an update in
terms of their timescales, however at this time it is anticipated that the project will be reprofilied to 23/24.
Mitigating Action
Officers liasing with GAA
Anticipated Outcome
Budget to be rephased to 23/24
Airport Noise
Noise Insulation Project 
Planned End Date  Forecast End Date
Anticipated Outcome
Element of budget required to be rephased to 23/24.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Development of QL system continues through 2022/23.  It was anticipated that two fixed term posts would be appointed to support
the ongoing development, however these posts have not yet been filled and this element of the budget will be required to be
reprofilled to 23/24.
Mitigating Action
None available at this time.
QL Development
This budget relates to the costs associated with the development of the Integrated Housing
Management System
None available at this time.
Anticipated Outcome
Project to complete over budget.
Capitalised minor works
This is a budget to undertake specific minor ad hoc capital projects that arise on demand 
Planned End Date  Forecast End Date
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
Main Issues / Reason for Variance
Budget overspend is anticipated due to costs and demand for budget being higher than anticipated at time of budget setting.
Mitigating Action
Page 221

Page 222

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
4
Project Life Financials 17,607 1,875 11% 17,607 0 0%
Current Year Financials 4,955 1,875 38% 2,700 (2,255) -46%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
5
Project Life Financials 10,963 931 8% 10,963 0 0%
Current Year Financials 2,500 931 37% 1,000 (1,500) -60%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
6
Project Life Financials 566 141 25% 658 92 16%
Current Year Financials 108 141 131% 200 92 86%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
Projected to exceed budget, this is necessary work to meet demand and comply with legislation.
Mitigating Action
None available.
Anticipated Outcome
Budget to overspend.
Statutory/regulatory compliance works (lifts/electrical/legionnella/fire etc)
This budget will be used to upgrade / replace components / installations in order to comply with
the relevant standards / legislation / health and safety in relation to housing stock. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Officers working to meet revised targets.  Additional external support has been programmed in from August onwards to assist with
window installs, feedback from officers have highlighted challenges with resource levels from back-up contractor. Internal
resources are being maximised to increase installs where possible. This will be monitored closely, however approximately £1.5m
will need to reprofiled into 23/24.
Mitigating Action
Building Services actively redeploying internal resurces to assist with installs and working with external support to maximise
contribution.
Anticipated Outcome
Anticipated to meet reduced forecast spend balance to be re-phased into future years.
Anticipated Outcome
Full budget will not be spent and balance to carry into 23-24
Doors/window component renewals
Doors/Windows Component Renewals 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Currently behind monthly targets, unlikely to meet full spend and targets. Current tiled roof progress is behind cumulative monthly
targets but overall output is anticipated to increase with the new metal and flat roof framework contract coming on board
contributing to a wider range of roof types being completed.
Mitigating Action
Officer and contracts team working to maximise progress where possible to increase completions and spend.
Roof Coverings
Building external component renewals, roofs/chimneys/flashings/fascias/gutters/svp
Page 222

Page 223

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
7
Project Life Financials 5,092 2,352 46% 6,723 1,631 32%
Current Year Financials 969 2,352 243% 2,600 1,631 168%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
8
Project Life Financials 5,293 1,444 27% 5,887 594 11%
Current Year Financials 1,036 1,444 139% 1,630 594 57%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
9
Project Life Financials 8,384 3,455 41% 10,234 1,850 22%
Current Year Financials 2,000 3,455 173% 3,850 1,850 93%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
10
Project Life Financials 3,637 481 13% 3,637 0 0%
Current Year Financials 887 481 54% 600 (287) -32%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Mitigating Action
Contracts team working to maximise progress and outturn where able to.
Anticipated Outcome
Full spend unlikely to met and balance to carry forward to 23-24
Defective structures/component renewals
Defective structures 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Slightly behind schedule and anticipated to be under full spend target. Balance to be reprofiled to 23/24.
Anticipated Outcome
Void properties to be brought up to lettable standard, budget to overspend.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Void works to continue into 22/23 to bring void properties up to a lettable standard.  The high number of voids has led to a higher
than expected demand for this budget, resulting in a projected overspend in 22/23. 
Mitigating Action
None available at this time
Void house strategy programme
Spend on Void Properties to bring them up to letting standard
Main Issues / Reason for Variance
Budget overspend is anticipated due to costs and demand for budget being higher than anticipated at time of budget setting.
Mitigating Action
None available at this time.
Anticipated Outcome
Project to complete over budget.
Modern facilities and services
New Kitchens, Bathrooms and Showers 
Planned End Date  Forecast End Date
Mitigating Action
None available since essential spend.
Anticipated Outcome
Budget to overspend.
Heating improvement works
Carry out works to renew inefficient boilers/full systems as identified from the stock condition
survey and renewal of obsolete/damaged boilers. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
An overspend is anticipated on this budget, as experienced in recent years as demand has exceeded expectations. Current
progress continues this trend. Due to the nature of this project (ensuring heating and hot water availability) there is no option for a
conscious reduction of installs.
Page 223

Page 224

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
11
Project Life Financials 5,092 1,278 25% 5,491 399 8%
Current Year Financials 969 1,278 132% 1,368 399 41%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
12
Project Life Financials 106,883 1,440 1% 106,556 (326) 0%
Current Year Financials 39,645 1,440 4% 11,972 (27,673) -70%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Sites to be reprofiled £m
Aitkenbar Primary School (374)
Clydebank East (13,754)
Queens Quay Site B (629)
Queens Quay Site C (878)
Pappert (4,481)
Bank Street (575)
Willow Park Phase  1 (1,989)
Mount Pleasant (2,420)
Future New build sites (2,246)
TOTAL OF ALL PROJECTS (27,346)
Aitkenbar - Fully complete. Project spend now requires to be reprofiled. Retention figure of £0.374m budgeted to be paid out in
2022/23 will now be reprofiled to be paid in 2023/24 to allow time to finalise account.
Main Issues / Reason for Variance
Progress will continue to be monitored as the year progresses.  The £27.673 variance is made up of £0.326m underspend and a
reprofiling of £27.346m into 2023/24 onwards . Summary of reprofiled sites together with site specific updates as follows:-
Clydebank East - 88 units to be completed on the site. Works commenced on this development on 23rd January 2023, the revised
costs were reported to the Housing and Communities Committee in November 2022 and the initial programme will see the
remedial works and external drainage programme, a construction site start is programmed for May 2023.  The total programme
for the works will now be 116 weeks. The development at Clydebank East will see the completion of a major housing led
regeneration of a key priority area identified in the Local Housing Strategy and will be the Council’s first fully zero carbon housing
development and marks a significant milestone in our transition to net zero approved at the August 2022 meeting of the Housing
and Communities Committee.
Queens Quay Site B - 29 units now completed on the site. Project spend now requires to be reprofiled. Retention figure of
£0.629m budgeted to be paid out in 2022/23 will now be reprofiled to be paid in 2023/24 to allow time to finalise account.
Queens Quay Site C  – 20 units to be completed on site. 20 units to be completed on site. Project spend now requires to be
reprofiled. The budget provision is to acquire additional land within Queens Quay to enhance the Site C proposals, the
discussions with CRL/Rydens have been protracted but we intend to make an offer shortly subject to a revised  DV valuation
being received. This will be reprofiled into 2023/24 (£1.878m).
Affordable Supply Programme
Affordable Housing Supply Programme 
Planned End Date  Forecast End Date
Anticipated Outcome
Full budget spend, with overspend anticipated.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
An overspend is anticipated in 22-23 due to level of demand and a number of larger projects than anticipated together with
material costs being higher than expected at time of budget setting.
Mitigating Action
None available at this time.
Environmental renewal works, paths/fences/walls/parking area's
Environmental renewal works, paths/fences/walls/parking areas
Page 224

Page 225

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
TOTAL OF ALL PROJECTS
Project Life Financials 166,246 14,107 8% 170,855 4,609 3%
Current Year Financials 53,876 14,107 26% 26,815 (27,062) -50%
Future New Build gap sites  – Project spend now requires to be reprofiled. Ongoing work to acquire private and Council owned
sites to finalise wider strategy . Expected that there will be  spend of £0.500m this during 2022/23 so £2.246m will be reprofiled
into 2023/24.
Anticipated Outcome
Project will still complete and will meet revised spend profiles .
Bank Street - 20 units to be completed on the site. Project spend needs reprofiled due to wider strategic reasons and potential
reprovisioning of sheltered accommodation which will require consultative exercise . Revised estimated start date July 2023,
estimated completion January 2025.  Project is currently at feasibility stage.  Likely outturn for 22/23 for the Bank Street site is
expected to be circa. £0.420m with £0.575m therefore required to be reprofiled to 23/24.
Willox Park Phase1 - 17 units to be completed on site. Project spend now requires to be reprofiled.  Pre planning discussions
were more involved than anticipated and required some re designing which has resulted in delay to estimated start date from
January 2023 to June 2023 with estimated completion May 2024.  Demolition complete, and site investigation under way.  Officers
ready to submit to for full planning.  Tender application expected to go out April 2023.  At this stage spend in the current year is
expected to be £0.400m against budget of £2.390m resulting in reprofiling rquirement of £1.989m.
Mount Pleasant - 25 units to be completed on site. Project spend now requires to be reprofiled. Unanticipated longer time frame
for demolition (9 months) has delayed this project by 6 months, now estimating a March 2023 site start, although demolitions are
planned for next month. £0.100m expected costs in 22/23, resulting in reprofiling requirement of £2.420m to 23/24.
Bonhill Gap Site - 32 units to be completed on site.  Estimated start date July 2023 and estimated completion September 2024. 
The project is currently  at design stage with spend of £0.420m expected in 22/23.  No reprofilng required.
Mitigating Action
Staff will work closely with all stakeholders to try and ensure timely resolutions of issues as they arise.
Pappert - 27 units to be completed on site . Projects spend now requires to be reprofiled.  The anticipated site start of October
2022 was not be realised due to a number of factors that have caused the project to miss a number of milestones, notably a
longer than anticipated procurement process and the subsequent delay in developing a contract/tender preparation forced us to
miss a pricing window from the contractor, we now have a new cost price and this project was recently in receipt of an additional
£1.25m form the Scottish Government Vacant and Derelict Land Fund which willl be received in 2023/24 and 2024/25.  It is
expected £0.500m will be paid out in 2022/23 with the remaining £4.481m to be reprofiled into 2023/24 and an anticipated site
start in autumn 2023.
Page 225

Page 226

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,487 430 17% 2,487 0 0%
Current Year Financials 474 430 91% 474 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 1,557 318 20% 1,557 0 0%
Current Year Financials 664 355 54% 664 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials 170 0 0% 170 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
4
Project Life Financials 17 0 0% 17 0 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Community Safety Projects
Community Safety Projects 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Gypsy Travellers Site
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Better Homes Priority Budget
Priority projects as prioritised by the Better Homes Group 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
A number of priority initiatives, supported by the Better Homes Project Board,  are being investigated and are envisaged to have a
positive impact on the current council housing stock and budget, with works expected to progress in 22/23.
Adaptations to Housing for Special Needs 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets. Possibility of overspend due to price increases and demand levels rising.
Mitigating Action
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
Special needs adaptations
None available at this time
Anticipated Outcome
Full budget spend, possibility of overspend.
Page 226

Page 227

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 36 0 0% 36 0 0%
Current Year Financials 36 0 0% 36 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
6
Project Life Financials 19,841 3,863 19% 19,841 0 0%
Current Year Financials 4,455 3,863 87% 4,455 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
7
Project Life Financials 257 32 13% 257 0 0%
Current Year Financials 75 32 43% 75 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Mitigating Action
None required
Anticipated Outcome
Full budget spend
External stores/garages/bin stores/drainage component renewals
This budget is to focus on external stores/garages/bin stores etc. component renewals as
identified and recommended from the housing stock condition survey. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Targeted SHQS /EESSH compliance works
This budget is to focus on work required to maintain the SHQS compliance and energy
efficiency  with WDC housing stock.   
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets. Current progress is slightly behind cumulative monthly targets, work is
progressing and numbers improving.
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
5 redeployable cameras to be purchased as planned.  No issues anticipated.
Mitigating Action
None required
Redployable CCTV Cameras
Purchase of 5 redeployable CCTV cameras for Housing use
Page 227

Page 228

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
8
Project Life Financials 273 76 28% 273 0 0%
Current Year Financials 91 76 83% 91 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
9
Project Life Financials 280 0 0% 280 0 0%
Current Year Financials 54 0 0% 54 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
10
Project Life Financials 103 0 0% 103 0 0%
Current Year Financials 103 0 0% 103 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
11
Project Life Financials 581 0 0% 400 (181) -31%
Current Year Financials 181 0 0% 0 (181) -100%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
No Issues, contingent budget for unplanned spend
Mitigating Action
none at this time
Anticipated Outcome
Spend as required
Contingencies
This is a contingent budget for unforeseen matters which may arise during the year. 
Planned End Date  Forecast End Date
Mitigating Action
None available at this time
Anticipated Outcome
Full budget spend potential for budget to re-phase into 23-24
Improvement works (Risk St)
Risk Street Over clad 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets. Intruction for roof works has been issued and following necessary survey
and surface tests physical works will be scheduled, should this not be fully completed by year end budget to re-phase into 23-24
for completion.
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Energy improvements/energy efficiency works
Energy improvements/ efficiency works (e.g. loft insulation, pipe/tank insulation, draught
exclusion)
Anticipated Outcome
Anticipated not to meet full spend despite best efforts.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
This programme always presents challenges with owner liaison and reaching agreements to install door entry where none exists,
this contributes directly to achieving SHQS compliance for this element and reducing abeyances. The budget reflects the demand
and number of installs required but it is acknowledged that full uptake is unlikely.
Mitigating Action
Officers continue to liaise with owners to encourage agreement for install.
Secure entry component renewals
This budget is to focus on secure door entry component renewals as identified and
recommended from the housing stock condition survey and appropriate council officer referrals.
Page 228

Page 229

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
12
Project Life Financials 1,135 126 11% 1,135 0 0%
Current Year Financials 215 126 58% 215 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
13
Project Life Financials 2,378 0 0% 2,378 0 0%
Current Year Financials 800 0 0% 800 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
14
Project Life Financials 7,729 1,153 15% 7,729 0 0%
Current Year Financials 2,019 1,153 57% 2,019 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
15
Project Life Financials 13,031 1,878 14% 13,031 0 0%
Current Year Financials 2,504 1,878 75% 2,504 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
No Issues, budget for salaries and support
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Salaries/central support/offices
Allocation of costs from other WDC services who support the HRA capital programme 
Planned End Date  Forecast End Date
Anticipated Outcome
Budget spend anticipated, should criteria be met.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
The main objective of the Buy Back Scheme is to bring former council properties that were sold through the RTB scheme, back
into council use.  These properties must assist the council with reducing housing need on the waiting list and where appropriate
assist with external capital works.  For these reasons, any purchase is subject to stringent criteria to ensure accountability and
value for money for existing tenants.  Spend in 22/23 will therefore be dependent on these factors.  So far this year, 15 homes
have been purchased, with the target to deliver an additional 20 homes each year through the buyback scheme.
Mitigating Action
None required.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Buy Backs
This is a budget to undertake specific projects that will deliver housing policies/strategies,
example: Ex local authority and mortgage to rent buy-back scheme
Multi Story Flats  ( including Fire Risk Assessment Works)
High Rise Fire Safety Measures 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet spend and revised targets.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Asbestos management works
This budget is to fund work associated with the management of current asbestos legislation and
the Council's asbestos policy within housing stock. 
Planned End Date  Forecast End Date
Page 229

Page 230

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
TOTAL OF ALL PROJECTS
Project Life Financials 49,874 7,875 16% 49,694 (181) 0%
Current Year Financials 11,727 7,912 67% 11,547 (181) -2%
Page 230

Page 231

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (48,826) (4) 0% (48,826) 0 0%
Current Year Financials (30,006) 0 0% (10,480) 19,526 -65%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials (42,531) 0 0% (38,702) 3,829 -9%
Current Year Financials (9,215) 0 0% (5,386) 3,829 -42%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials (124,667) (21,658) 17% (124,667) 0 0%
Current Year Financials (26,286) (21,658) 82% (22,078) 4,208 -16%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Prudential borrowing is impacted by programme delivery therefore due to reprofiling, the requirement in 2022/23 will be less.
Mitigating Action
None available at this time.
Anticipated Outcome
While prudential borrowing requirement is likely to be less than budgeted in the current financial year this is anticipated to catch
up over the programme life.
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved
for the purposes of funding capital expenditure
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Income from Revenue reduced to offset adverse varainces in HRA revenue
Mitigating Action
None required
Anticipated Outcome
Reduced CFCR
CFCR
This is capital spend which is funded by revenue budgets
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Main Issues / Reason for Variance
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
New Build Grant 
Grant to facilitate new build housing 
Planned End Date  Forecast End Date
Due to spend being later than anticiapted , receipt of grant will also be later than budgeted.
Mitigating Action
Income budget wil be reprofiled to match reprofiled spend
Anticipated Outcome
Income will be received in 2023/24
Page 231

Page 232

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2023
Budget Details Project Life Financials
Spend to Date Variance
New Build Grant 4
Project Life Financials (96) (357) 372% (513) (417) 434%
Current Year Financials (96) (357) 372% (417) (321) 334%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL RESOURCES
Project Life Financials (216,120) (22,019) 10% (212,708) 3,412 -2%
Current Year Financials (65,604) (22,015) 34% (38,361) 27,242 -42%
£0.096m estimated income from Glasgow Airport Authority is now not expected to be received in 22/23 as works have not
progressed.  Works and therefore income now expected 23/24.  £0.416m Scottish Governmant Grant income estimated in
relation to buy backs.
Mitigating Action
None available
Anticipated Outcome
Income will be received when due
Other Capital Income
Other Income to capital
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Page 232

Page 233

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
HRA CAPITAL PROGRAMME
ANALYSIS OF AFFORDABLE HOUSING SUPPLY PROGRAMME
MONTH END DATE
PERIOD 10
Budget Spend to Date Forecast Spend
£000 £000 £000 £000 %
RAG
Status
St Andrews School 636 129 290 346-   -54% 
Haldane Primary School 148 149 167 20 13% 
Aitkenbar Primary School 652 278 652 - 0% 
Clydebank East 26,474 58 26,474 - 0% 
Creveul Court 58 59 58 - 0% 
Queens Quay Site B 1,259 404 1,259 - 0% 
Queens Quay Site C 6,198 1 6,198 - 0% 
Pappert 7,332 3 7,332 - 0% 
Lilac Avenue 2,676 - 2,676 - 0% 
Bank Street 4,674 - 4,674 - 0% 
Clydebank Health Centre 6,930 6 6,930 - 0% 
Willox Park Phase1 3,817 54 3,817 - 0% 
Willox Park Phase2 6,300 - 6,300 - 0% 
Mount Pleasant 4,200 94 4,200 - 0% 
Silverton 2,100 - 2,100 - 0% 
Fees, Staffing Costs, contingency 4,005 31 4,005 - 0% 
Gap sites
Bonhill Gap Site 420 174 420 - 0% 
Future New build sites 16,824 - 16,824 - 0% 
Total Expenditure 94,703 1,440 94,376 (326) 
31 January 2023
Site
Project Life Financials
Variance
Page 233