WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2022/23
SUMMARY
PERIOD END DATE 31 August 2022
Total Budget Spend to Date Projected Spend Annual
RAG Status
Net Variance
attributable to
covid*
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
Resources 5,355 3,836 5,403 48 1%  0 48
Regulatory and Regeneration 2,784 1,761 3,095 312 11%  0 312
People & Technology 7,024 3,491 6,965 (59) -1%  0 (59)
Citizens, Culture and Facilities 17,939 7,585 17,767 (172) -1%  (24) (148)
Education, Learning and Attainment 108,388 36,127 108,861 473 0%  203 270
Roads and Neighbourhood 14,601 11,495 15,072 471 3%  0 471
5,258 1,960 5,269 11 0%  10 1
Supply, Distribution and Property (2,730) (900) (2,822) (92) 3%  35 (127)
Miscellaneous Services 8,042 2,671 8,341 299 4%  140 159
Loan Charges 9,518 4,126 9,903 385 4%  0 385
Capital Receipts used to fund Loan Charges (2,884) (149) (2,884) 0 0%  0 0
Requisition (VJB) 765 319 765 0 0%  0 0
Requisition (SPT) 1,632 680 1,632 0 0%  0 0
Requisition (CJP) 1,693 705 1,693 0 0%  0 0
Requisition (HSCP) 81,690 34,038 81,690 0 0%  0 0
Non GAE Allocation (7,328) (3,053) (7,328) 0 0%  0 0
Vacancy Freeze 648 0 0 (648) -100%  0 (648)
Contingency Fund 0 0 0 0 0%  0 0
Total Expenditure 252,394 104,690 253,421 1,026 0%  365 661
Council Tax (38,126) (9,471) (38,126) 0 0%  0 0
Revenue Support Grant/ NDR (209,167) (96,088) (209,167) 0 0%  0 0
Covid Funding (specific and earmarked from 2021/22) (3,367) (1,122) (3,367) 0 0%  0 0
Required use of available unearmarked  covid funds 0 0 (365) (365) 0%  (365) 0
Capital Receipts used to fund Transformation (700) 0 (700) 0 0%  0 0
Use of Reserves (1,034) (431) (1,034) 0 0%  0 0
Total Resources (252,394) (107,112) (252,759) (365) 0%  (365) 0
Net Expenditure (0) (2,422) 661 661 0.26%  0 661
Department Summary Variance
Housing and Employability

Page 2

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
RESOURCES SUMMARY
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
105 144 105 0 0%  0 0
1,398 592 1,429 32 2%  0 32
(341) 1,034 (341) 0 0%  0 0
2,103 1,053 2,147 44 2%  0 44
303 110 312 9 3%  0 9
19 (14) (4) (23) -121%  0 (23)
(790) (113) (790) 0 0%  0 0
Central Administration Support 2,558 1,030 2,545 (13) -1%  0 (13)
5,355 3,836 5,403 48 1%  0 48Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Variance
Service Summary
Service / Subjective Summary
Finance Business Centre
Audit
Revenues & Benefits

Page 3

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
756 297 774 19 0  0 19
699 294 750 51 0  0 51
(117) (27) (99) 18 (0)  0 18
824 367 790 (34) (0)  0 (34)
377 226 629 252 1  0 252
Economic Development 245 604 251 7 0  0 7
2,784 1,761 3,095 312 0  0 312
Democratic and Registration Service
Legal Services
Licensing
Environmental Health
Planning
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary

Page 4

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
743 301 746 3 0%  0 3
1,283 517 1,283 0 0%  0 0
4,502 2,495 4,440 (62) -1%  0 (62)
497 177 496 (1) 0%  0 (1)
7,024 3,491 6,965 (59) -1%  0 (59)
Variance
Total Net Expenditure
Transactional Services
Change Support
Information Services
Human Resources (including risk)
Service / Subjective Summary
Service Summary

Page 5

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
333 107 325 (8) -2%  0 (8)
1,284 541 1,305 21 2%  3 19
357 80 315 (42) -12%  0 (42)
Clydebank Town Hall 458 49 458 (0) 0%  0 (0)
Office Accommodation 1,275 396 1,285 9 1%  0 9
Libraries 1,811 594 1,777 (35) -2%  (27) (8)
Arts and Heritage 371 134 346 (24) -7%  0 (24)
Catering Services 4,454 1,668 4,383 (71) -2%  0 (71)
Building Cleaning 1,703 882 1,661 (42) -2%  0 (42)
Building Cleaning PPP (331) (171) (331) (0) 0%  0 (0)
Facilities Assistants 2,100 801 2,119 19 1%  0 19
Facilities Management 396 126 397 0 0%  0 0
Leisure Management 3,638 2,298 3,639 1 0%  0 1
Events 89 80 89 0 0%  0 0
17,939 7,585 17,767 (172) -1%  (24) (148)
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy

Page 6

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Primary Schools 31,705 12,248 31,513 (192) -1%  0 (192)
Secondary Schools 30,996 12,895 31,151 155 1%  0 155
Specialist Educational Provision 16,767 5,523 17,196 429 3%  203 226
Psychological Services 571 179 571 0 0%  0 0
Sport Development / Active Schools 627 200 627 0 0%  0 0
Early Education 8,420 (3,230) 8,412 (8) 0%  0 (8)
PPP 15,420 7,011 15,474 54 0%  0 54
Creative Arts 620 286 620 0 0%  0 0
Curriculum for Excellence 202 31 202 0 0%  0 0
Central Admin 852 403 857 5 1%  0 5
Workforce CPD 349 109 349 0 0%  0 0
Performance & Improvement 453 146 453 0 0%  0 0
Education Development 1,407 326 1,436 29 2%  0 29
Raising Attainment - Primary 0 0 0 0 0%  0 0
Raising Attainment - Secondary 0 0 0 0 0%  0 0
Pupil Equity Fund (including LAC PEF) 0 0 0 0 0%  0 0
108,388 36,127 108,861 473 0%  203 270
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure

Page 7

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Transport, Fleet & Maintenance Services (592) 223 (519) 73 -12%  0 73
Roads Services 2,932 1,915 2,892 (40) -1%  0 (40)
Grounds Maintenance & Street Cleaning Client 7,503 3,126 7,503 0 0%  0 0
Outdoor Services 187 55 169 (17) -9%  0 (17)
Burial Grounds (193) (217) (223) (30) 16%  0 (30)
Crematorium (1,032) (302) (969) 63 -6%  0 63
Waste Services 8,036 3,598 8,311 275 3%  0 275
Depots 0 120 0 0 0%  0 0
Ground Maintenance & Street Cleaning Trading A/c (2,240) 2,978 (2,092) 148 -7%  0 148
14,601 11,495 15,072 472 3%  0 472
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure

Page 8

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net
Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
Working 4 U 3,326 1,250 3,324 (2) 0%  0 (2)
Communities 995 433 995 0 0%  0 0
Homeless Persons 436 140 447 11 3%  10 1
Private Sector housing 32 0 35 3 9%  0 3
Anti Social Behaviour 469 137 468 (1) 0%  0 (1)
5,258 1,960 5,269 11 0%  10 1
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary

Page 9

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
SUPPLY, DISTRIBUTION AND PROPERTY
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Housing Maintenance Trading A/c (1,400) (753) (1,419) (19) 1%  0 (19)
Housing Asset and Investment 81 12 31 (50) -62%  0 (50)
Corporate Assets and Capital Investment Programme (2,196) (692) (2,308) (112) 5%  35 (147)
482 303 479 (3) -1%  0 (3)
(266) (100) (206) 60 -23%  0 60
Private Sector Housing Grants 78 (69) 80 2 3%  0 2
Consultancy Services 491 400 521 29 6%  0 29
(2,730) (900) (2,822) (92) 3%  35 (127)
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Corporate Asset Maintenance
Procurement

Page 10

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
MISCELLANEOUS
PERIOD END DATE 31 August 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
5,675 1,705 5,997 322 6%  140 82
620 254 645 25 4%  0 0
510 213 510 0 0%  0 0
1,237 499 1,189 (48) -4%  0 (48)
8,042 2,671 8,341 299 4%  140 34
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
European Employability
Service Summary
Sundry Services
Members Allowances, etc

Page 11

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
Environmental Health 699 750 51 7% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Planning 377 629 252 67% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Information Services 4,502 4,440 (62) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The main reason for the adverse variance is that income is lower than
budgeted due to cancelled or delayed building projects. The expected
income shortfall has increased since P4 by a further £94k after a further
review. This variance has been reported in previous months but was
being offset in part by savings on staff costs caused by vacancies, the
staffing vacancy savings have been removed in P5.
People & Technology
This Service provides Building & Planning services
None required at this point.
This service area provides general ICT support to the Council and also
supports transformational change and modernisation of working practices
through technology
Underspend is projected.
Supplies and Services is favourable due to computer licence costs
projected to cost less than budgeted.
The 3 Groups within this service (Food and Business Group,
Environmental Pollution Group and Community Health Protection Group)
are responsible for all aspects of Environmental Health work.
No action can be taken at this time
Overspend is anticipated
Regulatory and Regeneration
The main reason for the adverse variance is a reduction in expected
income for pest control in particular.
Overspend is anticipated
No action required
31 August 2022
Budget Details
Variance Analysis
Variance

Page 12

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 August 2022
Budget Details
Variance Analysis
Variance
Catering Services 4,454 4,383 (71) -2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Primary Schools 31,705 31,513 (192) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area includes all Primary Schools.
The budget was set before the delay to free school meal expansion was
confirmed. As primaries 6 & 7 will now not be covered by universal free
school meal provision from August 2022 income from school meals will be
significantly above the budgeted target income (£160k)  The increase in
clothing grants (£10k) and reduction in school lets income (£22k) have
been offset by a favourable variance on employee costs (£65k).
Education , Learning and Attainment
Favourable variance anticipated
A review of the vacancies and overtime position going forward is
underway
Citizens, Culture and Facilities
Catering Services across WDC
Overall variance is favourable due to vacancies. Increased spend
negates some of the favourable variance due to a one off charge for the
early termination charges for contract for vending machines and a higher
level of overtime than predicted due to the vacancies.
Overspend is anticpated
None necessary

Page 13

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 August 2022
Budget Details
Variance Analysis
Variance
Secondary Schools 30,996 31,151 155 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Specialist Educational Provision 16,767 17,196 429 3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area covers all ASN Services.
The adverse variance within employee costs  (£75k) is due to a
combination of turnover targets not being achieved and greater staffing as
part of our efforts to minimise external placements. Payments to Other
Bodies adverse variance is due to the ongoing high demands on the
Residential Placements Budget (£426k) albeit this is partly offset by lower
payments to other external bodies (£107k). The Residential budget was
set on the basis of a 20:80 split between Education and HSCP. However,
as per the forthcoming report to Council in October, invoices have to be
split 28:72. This change represents a budget shortfall of £265k. In
addition, the number of residential placements is 7% higher than the
average for 202122. Income from other local authorities placing children
within WDC schools is expected to be less than budgeted (£43k). 
The requirement for Residential Placements is demand-led  and decisions
are taken jointly with HSCP following an assessment of the best option for
all concerned. However, the actual usage throughout the year will be
reviewed regularly to identify where there is scope to reduce the number
of placements.
Income from sale of school meals is currently projected to be less than
budgeted (£85k).  The remaining adverse variance is due primarily to a
small overspend on employee costs (£52k) and unbudgeted
monoblocking repairs at VoLA (£16k).
Management will continue to review the service and take action where
appropriate to minimise the overspend. School meals income depends on
higher uptake from August.
adverse variance anticipated
This service area includes all Secondary Schools.
Adverse variance anticipated

Page 14

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 August 2022
Budget Details
Variance Analysis
Variance
PPP 15,420 15,474 54 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Transport, Fleet & Maintenance
Services (592) (519) 73 -12% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Crematorium (1,032) (969) 63 -6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Surplus slightly less than target
Waste Collection and Refuse disposal services
The level of internal recharges is under review
none possible at present
There is a favourable variance (£46k) against employee costs due to a
number of vacancies. However this is more than offset by higher fuel
costs (£150k), which will follow through to higher recharges to services.
Favourable variance from diesel recharges is less than the adverse
variance from higher prices as initial income target was too high.
Overspend anticipated
Transport services across WDC
Gas costs are higher than budgeted (£15k) while income is projected to
be less than budgeted , particularly from plaques/books of remembrance
etc (£25k)
Roads and Neighbourhood
This service area includes Vale of Leven, Clydebank High and St Peter
the Apostle High Schools and St Eunan's Primary School. The costs
charged to this service are Property costs and the Unitary charge.
The adverse variance has arisen due to water rates and contract cleaning
costs being greater than when the budget was set due to the level of
inflation on particular lines.
Management will continue to review the service and take action where
appropriate to minimise the overspend.
adverse variance anticipated

Page 15

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 August 2022
Budget Details
Variance Analysis
Variance
Waste Services 8,036 8,311 275 3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Ground Maintenance & Street Cleaning
Trading A/c (2,240) (2,092) 148 -7% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Housing Asset and Investment 81 31 (50) -62% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Employee costs are showing a favourable variance due to vacant posts
within the service.
Employee cost underspend is partially offset by a reduction in the level of
income being recharged to the Housing Revenue Account.
None Required
Forecast underspend at year end
None possible at this time
An adverse variance is anticipated
This service manages capital investment across council and private
sector housing stock.
Supply, Distribution and Property
Overspend anticipated
Property costs are adverse due to increased gas/electricity costs (£15k).
Fuel (£50k) , tyres (£15k) and plant/seed costs (£29k) have increased to a
level not anticipated when the budget was set.
Trading operation providing grounds maintenance and street cleaning
services
Employee costs are higher (£168k) as projected savings from waste
route optimisation ,which depend on operating from a single depot, are
not yet achievable . Expenditure on bin replacements is higher (£71k) ,
skip hire (£7k) and electricity (£8k) are greater than anticipated when the
budget was set. These have been partly offset by reduced vehicle hires
(£34k).
none possible at present
Waste Collection and Refuse disposal services

Page 16

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 August 2022
Budget Details
Variance Analysis
Variance
Corporate Assets and Capital
Investment Programme (2,196) (2,308) (112) 5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Corporate Asset Maintenance (266) (206) 60 -23% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Sundry Services 5,675 5,997 322 6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service provides asset and estate management
Lower than budgeted income due to a reduced programme of CAMS
work delviered by subcontractor partners. This will be partly offset by
reduced subcontractor expenditure.
None - Although service will endeavour to reduce the adverse variance
where possible through service efficiency
This service manages and undertakes repairs and maintenance to public
buildings
Favourable variance anticipated at year end
Surplus to be less than target
The favourable variance is due mainly to increased rents anticipated from
the Artizan Centre which is partially offset by a reduction in income
anticipated from Clyde Regional Centre. There is also a favourable
variance in employee costs due to a current vacancy
An overall adverse variance is anticipated at this time
Income and expenditure will continue to be monitored throughout the
year.
Miscellaneous
This service area budgets for non departmental specific costs such as
pensions costs, external grants and elderly welfare payments, external
audit fees and insurance costs. The service heading also holds a number
of general savings options which have still to be fully allocated.
After removing the effects of the general covid budget (£140k) which will
be required to be funded from unearmarked covid funds, the main
adverse variances are linked with property costs for assets not yet sold
and the level of procurement savings achieved to date
Income and expenditure will continue to be monitored throughout the
year.

Page 17

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 August 2022
Budget Details
Variance Analysis
Variance
Loan Charges 9,518 9,903 385 4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Required use of available unearmarked 
covid funds 0 (365) (365) 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This represents the funding from Scottish Government specifically for
covid and additional spend identified outwith specific  Council Services
The variance is funding service related covid costs
Income and expenditure will continue to be monitored throughout the
year.
Any variance will be offset by covid adverse variances within services, or
carried forward for future years allocation against covid costs
The adverse variance is linked with forecast on the cost of short term
borrowing with increased interest rates
Management will continue to monitor and maximise actions taken to
reduce any adverse variance, where possible.
Other
This budget covers the servicing of the Council's external borrowing
A favourable variance is anticipated

Page 18

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2022/23 Appendix 4
Efficiency Detail Chief Officer Area budgeted
Amount £
Projection of
Total Saved £
Projection of
Total Not Saved
£
Comment
Reduce costs of franking machines Amanda Graham 8,000              -                       8,000                   Action is underway and an element of this saving is
likely to be achieved by the year end, however not
guaranteed at this stage.
Review Rental Structure for Ashton View Supported
Accommodation Project
Peter Barry 21,000            21,000                 -                      
Reduce costs of storing supply of rock salt Gail McFarlane 44,000            44,000                 -                      
Reduce costs with use of pooled vehicles Gail McFarlane 60,000            60,000                 -                      
Reduce Teacher costs Laura Mason 35,467            35,467                 -                      
Increased income - Housing Maintenance Trading
Account (HMTA) / Corporate Asset Maintenance
(CAMS)
Angela Wilson 108,000          91,000                 17,000                 The CAMS income is lower than expected due to
reduced programme of work. This will continue to
be monitored and update if the situation changes
276,467          251,467               25,000

Page 19

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
PERIOD END DATE
PERIOD 5
Spend to Date Spend to
Date
£000 £000
Red
28 23.9% 35,103 38.0% 28 23.9% 1,306 33.9%
Amber
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Green
89 76.1% 57,364 62.0% 89 76.1% 2,550 66.1%
117 100% 92,466 100% 117 100% 3,857 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Actual
Variance Slippage Over/ (Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
67,653 35,103 67,772 119 17,624 1,306 4,803 (12,821) (12,304) (517)
0 0 0 0 0 0 0 0 0 0
204,182 57,364 202,128 (2,054) 47,963 2,550 45,053 (2,910) (1,768) (1,142)
271,835 92,466 269,900 (1,935) 65,587 3,857 49,856 (15,731) (14,072) (1,659)
(271,835) (92,466) (269,900) 1,935 (65,587) (3,857) (49,856) 15,731
0 0 0 0 0 0 0 0
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 August 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of Projects
at RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at RAG
Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green

Page 20

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 9 0 0% 9 0 0%
Current Year Financials 3 0 0% 0 (3) -100%
Project Description
Project Manager David Thomson
Chief Officer David Thomson
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials 0 3 0% 3 3 0%
Current Year Financials 0 3 0% 3 3 0%
Project Description
Project Manager David Thomson
Chief Officer David Thomson
Project Lifecycle 31-Mar-23 31-Mar-23
3
Project Life Financials 33 0 0% 33 0 0%
Current Year Financials 33 0 0% 0 (33) -100%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Mitigating Action
Valuation Joint Board - ICT Refresh FY 22/23
Replacement of laptops, monitors and other ICT equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Replacement of laptops, monitors and other ICT equipment. No further spend anticipated.
Mitigating Action
None available at this time.
Anticipated Outcome
Replacement of laptops and ICT equipment
Legal Case Management System
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Requisition ICT Equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget remains unspent and is likely to be carried forward into FY 23/24.
None available at this time.
Anticipated Outcome
Requisition of ICT Equipment.
Legal Case Management System
Forecast End Date
Main Issues / Reason for Variance
Budget has been rephased from 2021/22.  The project could not proceed as originally planned as Officers are required to access the
office and hardware the system will run on and COVID-19 restrictions have prevented this.  The project will have to go back out to
tender following the upgrade to Microsoft 365.  The project will not be completed in this financial year. 
Mitigating Action
Legal to discuss impact of Microsoft 365 with ICT.
Anticipated Outcome
Project to be completed in 2023/24.
Planned End Date

Page 21

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment4
Project Life Financials 61 3 5% 61 (0) 0%
Current Year Financials 55 0 0% 5 (50) -91%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
5
Project Life Financials 342 237 69% 347 5 1%
Current Year Financials 110 0 0% 20 (90) -82%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24Forecast End Date
Mitigating Action
Opportunities to mitigate are limited at this stage. 
Anticipated Outcome
Complete in 2023/24.
Installation of Solar PV at Clydebank Leisure Centre
Installation of Solar PV at Clydebank Leisure Centre.
Planned End Date
Main Issues / Reason for Variance
Specification delayed due to other priority works. Expect full spend in 2023-2024.
Replace obsolete boilers (plant greater than 30 years old).
Replace obsolete boilers (plant greater than 30 years old).
Planned End Date
Forecast End Date
Main Issues / Reason for Variance
Order raised for chimney inspection. Project team established. Await appointment of M&E consultant being procured via quick quote
by project QS. Works will be carried out in 2023-2024. Expect only design fees and survey fees and retention for St Marys to be paid
this year.
Mitigating Action
None available at this time.
Anticipated Outcome
Retention for St Mary's Primary School and design fees this year. Insufficient budget available to carry out Hub works.

Page 22

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment6
Project Life Financials 290 63 22% 290 0 0%
Current Year Financials 216 0 0% 50 (166) -77%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
7
Project Life Financials 80 19 24% 80 0 0%
Current Year Financials 61 1 1% 30 (31) -51%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
8
Project Life Financials 344 86 25% 344 0 0%
Current Year Financials 258 0 0% 15 (243) -94%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Project delivered within budget.
Mitigating Action
None available at this time
Anticipated Outcome
Zero Carbon Fund.
Main Issues / Reason for Variance
Further orders have been raised and await invoices. Total expenditure this financial year estimated to be £0.030m with the rest of the
funding to be carried forward into next financial year.
Mitigating Action
None available at this time
Anticipated Outcome
Anticipate some spend this year and the remainder to be rephased into 2023/24.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Initial survey works have commenced at HUB CEC. It has been agreed that OLSP will be the next BAM operated school that we will
install solar PV. Await proposals and costings. Works will cross into next financial year.
Energy Projects quick wins
Leisure Energy projects - air handling units, upgrade lighting, circulating pumps, and draught proofing
Anticipated Outcome
Main Issues / Reason for Variance
Existing controls have been found to be obsolete and not compatible with a new AHU controls. Additional timelines and work involved.
Design team established and project specification being compiled.
Mitigating Action
All works to be complete in one tender package.
Planned End Date Forecast End Date
All works to be completed next financial year 2023/24.
Measures to be installed at both Meadow Centre & Vale of Leven Swimming Pool; new pool hall
Air Handling Units, upgrade lighting, circulating pumps Vale of Leven Swimming Pool, internal and
external lighting and draught proofing.
Spend to Save projects.
Planned End Date Forecast End Date
Zero Carbon Fund

Page 23

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment9
Project Life Financials 160 0 0% 160 0 0%
Current Year Financials 152 0 0% 80 (72) -47%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
10
Project Life Financials 750 0 0% 0 (750) -100%
Current Year Financials 750 0 0% 0 (750) -100%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Dec-22 30-Jun-23Planned End Date Forecast End Date
Main Issues / Reason for Variance
Due to factors outwith the Council's control, progress couldn’t be made on a timeline that would be acceptable to funders and as a
result Scottish Government will withdraw the grant offer.
Mitigating Action
None available at this time.
Anticipated Outcome
Viresco Studios and Arts Centre
Viresco Studios and Arts Centre in Alexandria, aimed to encourage wider participation in the arts,
creative enterprises and cultural activity in West Dunbartonshire.
Repurposing and restoration of B listed former St Andrew's church in Alexandria for community arts uses.
Upgrade obsolete heating controls (BEMS) across Council estate
Upgrade obsolete heating controls (BEMS) across Council estate.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Tender documentation currently being prepared. Work scheduled between October 2022 and March 2023 but suspect it will carry
forward into the new financial year due to necessary disruption to heating in the buildings.
Mitigating Action
None available at this time.
Anticipated Outcome
Delivery of project within budget.

Page 24

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment11
Project Life Financials 747 0 0% 747 0 0%
Current Year Financials 747 0 0% 90 (657) -88%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Dec-22 30-Jun-23
12
Project Life Financials 22,100 1,821 8% 22,100 (0) 0%
Current Year Financials 7,465 53 1% 2,262 (5,203) -70%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-25 31-Mar-25
13
Project Life Financials 382 388 102% 388 6 2%
Current Year Financials 0 6 0% 6 6 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-21
Main Issues / Reason for Variance
Kier is appointed to design and deliver the Activities Centre at Clydebank Town Centre. Design of the project is underway and a
commencement date for construction has been confirmed as April 2023. The budget will slip into 2023-2024 however some spend on
design development expected in the current financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
New sports changing facility completed.
New Sports Changing Facility at Duntocher
New Sports Changing Facility at Duntocher
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project completed over budget due to ground conditions on site.  Final costs now charged.
Connecting Dumbarton and Glencairn House are progressing per the agreed programme. A future programme for the Artizan Centre
based on the Redevelopment Options consultancy will be reported to IRED, after which proposed in year spend may be adjusted.
Costs will continue to be monitored by the LUF Project Board. Update due to IRED September 2022.
Mitigating Action
None available at this time.
Anticipated Outcome
Mitigating Action
None available at this time.
Anticipated Outcome
New community-run activities centre in Clydebank Town Centre.
LUF
Year one LUF spend includes acquisition cost of Artizan Centre, and design development for
Glencairn House and Connecting Dumbarton
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Clydebank Can On The Canal
New activities centre in Clydebank Town Centre.
Redevelopment of the Dumbarton Town Centre
Planned End Date Forecast End Date

Page 25

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
14
Project Life Financials 750 765 102% 765 15 2%
Current Year Financials 86 101 118% 101 15 18%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
15
Project Life Financials 2,375 87 4% 2,375 (0) 0%
Current Year Financials 1,090 3 0% 28 (1,063) -97%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-24
Mitigating Action
None available at this time.
Anticipated Outcome
New build community facility.
New Westbridgend Community Centre
New Westbridgend Community Centre
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Various delays due to Covid and other utility issues. Planning was previously delayed but now resolved. Building warrant applications
submitted with a view to tender being issued December 2022. Anticipated to be onsite by April 2023.
Main Issues / Reason for Variance
Project now complete.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered on budget.
Holm Park & Yoker Athletic FC
Develop a new 3G pitch to act as a home venue for Clydebank FC with extensive community
Planned End Date Forecast End Date

Page 26

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment16
Project Life Financials 400 47 12% 400 0 0%
Current Year Financials 357 3 1% 100 (257) -72%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Oct-23 31-Oct-23
17
Project Life Financials 2,646 3,402 129% 3,402 756 29%
Current Year Financials 910 1,036 114% 1,036 126 14%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
Posties Park Sports Hub - New sports hub to include gym & running track
Creation of a sports hub at Posties/Marinecraft to include a new changing pavilion/Gym, new all-
weather 6 lane running track, conversion of blaze sports pitch to grass, new fencing, upgrade of
existing floodlights and additional car parking.  This combines the budget approved by the Council
in February 2015 for Community Sports Facilities at Posties Park, draw down of budget from the
generic sports facilities budget line.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project start was delayed due to planning issues and COVID-19 restrictions. Work commenced January 2021 with a proposed
completion date of March 2022 which has been extended to October 2022 due to design changes required by Planning. There is still a
significant amount of work to be undertaken to complete the project and the cost of this work has been affected by Covid, Brexit and
supply chain issues. A forecast is uncertain at this time pending discussions and negotiations with the contractor however additional
budget will be required to complete this project.
Mitigating Action
None required at this time.
Anticipated Outcome
New all weather running track and gymnasium.
Anticipated Outcome
Two new allotment sites with 80 plots and community growing space.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Two sites are being developed at Dillichip Loan Bonhill and Overburn Dumbarton. These sites will provide eighty traditional allotment
plots together with community food growing facilities. It is anticipated that project works will commence in February 2023 with a
completion date of October 2023.
Mitigating Action
None available at this time.
Allotment Development
To develop an allotment site.

Page 27

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment18
Project Life Financials 817 263 32% 817 (0) 0%
Current Year Financials 553 0 0% 150 (403) -73%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 30-Sep-22
19
Project Life Financials 217 3 1% 217 0 0%
Current Year Financials 214 0 0% 0 (214) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
20
Project Life Financials 400 358 90% 400 0 0%
Current Year Financials 42 0 0% 0 (42) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Main Issues / Reason for Variance
Road construction works completed in previous years. Remaining funds are insufficient to complete footpath construction. Works on
hold until such time as additional funds can be secured.
Mitigating Action
None available at this time.
Anticipated Outcome
To complete remaining civil works required.
Main Issues / Reason for Variance
Project is now being developed for tendering, with project commencing February 2023 and completion expected by 31 October 2023. 
It is anticipated that £0.150m will be spent this financial year mainly on consultant costs and enabling works.
Mitigating Action
None available at this time.
Anticipated Outcome
Extension to existing cemetery providing a sustainable burial environment.
Vale of Leven Cemetery Extension
Extension of existing cemetery in Vale of Leven.
Planned End Date Forecast End Date
Anticipated Outcome
To improve journey times and reliability of bus services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Officers working with external partners to identify projects to support funding. Investigation on going however unlikely works will be
able to progress this financial year.
Mitigating Action
None required at this time.
Bus Rapid Deployment Fund
Funding has been awarded from Sustrans to assist with social distancing measures required as a
result of the COVID-19 pandemic.
Auld Street Clydebank - Bond
Completion of roadworks associated with Auld Street housing development. Creation of a footpath
to Golden Jubilee Hospital.
Planned End Date Forecast End Date

Page 28

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment21
Project Life Financials 500 11 2% 500 0 0%
Current Year Financials 220 0 0% 0 (220) -100%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
22
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 0 (1,000) -100%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
23
Project Life Financials 2,817 0 0% 2,817 0 0%
Current Year Financials 2,817 0 0% 600 (2,217) -79%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Vehicle Replacement
Replacement of vehicles which have reached end of programmed lifespan (7 year heavy vehicles,
10 year light vehicles).
Mandatory 20mph Residential communities
Mandatory 20mph Residential communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project to be delivered within budget.
Mitigating Action
None available at this time.
Anticipated Outcome
Awaiting Scottish Government recommendations.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Larger vehicles will be delayed due to supply chain issues. Delivery timescales anticipated at 18 months.
Mitigating Action
None available.
Anticipated Outcome
Anticipated Outcome
Vehicle Replacement Strategy
Replacement of refuse collection vehicles.
Replacement of refuse collection vehicles.
Replacement of fleet within budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Vehicles are being ordered for delivery in this financial year but larger vehicles will be delayed into financial year 2023/2024.
Mitigating Action
None Required.

Page 29

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment24
Project Life Financials 199 236 119% 236 37 19%
Current Year Financials 9 47 494% 47 37 394%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Oct-22 31-Oct-22
25
Project Life Financials 924 0 0% 924 0 0%
Current Year Financials 154 0 0% 40 (114) -74%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
Free School Meals
Provision of Capital Funding from Scottish Government to implement free school meal initiative.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project is complete other than snagging works which can only be completed when school is closed however project end date is still on
target. Additional budget required in relation to electrical phasing which was unknown at the time of project inception.
Anticipated Outcome
Project delivered within amended timescales.
None available at this time.
Mitigating Action
None available at this time
Community Alarm upgrade
To upgrade Community Alarm
Planned End Date
Anticipated Outcome
Forecast End Date
Main Issues / Reason for Variance
Work is ongoing with HR colleagues in order to appoint a project manager to this post and it is anticipated that spend will progress in
the final half of the financial year.
Community Alarm Upgrade

Page 30

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment26
Project Life Financials 1,400 0 0% 1,400 0 0%
Current Year Financials 280 0 0% 40 (240) -86%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
27
Project Life Financials 27,531 27,266 99% 27,531 0 0%
Current Year Financials 42 55 130% 55 13 30%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-22 31-Mar-22
28
Project Life Financials 379 42 11% 425 46 12%
Current Year Financials 0 0 0% 46 46 0%
Project Description
Project Manager Arun Menon
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-30 31-Mar-30
Project complete with a slight overspend due to additional works required in relation to roof vents which required to be installed.
Main Issues / Reason for Variance
The replacement of CareFirst has been delayed because of challenges in respect of the recruitment of a Digital Business Lead to take
forward the project. Work is ongoing with HR colleagues in order to consider how the recruitment challenge may be addressed.
Mitigating Action
Main Issues / Reason for Variance
Mitigating Action
The statement of final account has been signed and financial risk exposure should be reduced through efforts to dispose of the
existing properties at the earliest opportunity.
Anticipated Outcome
Dumbarton Care Home opened 2017.  Clydebank Care Home was certified complete on 9 November 2020.
Replace Elderly Care Homes and Day Care Centres
Design and construction of replacement elderly care homes and day care centres in Dumbarton
and Clydebank areas.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Work continues on developments resulting in some spend in the current year.
Mitigating Action
None required.
Anticipated Outcome
Development of Workforce Management System.
Development of Workforce Management System
Project to develop the Workforce Management System.
Planned End Date Forecast End Date
None available at this time
Anticipated Outcome
Replacement of Care First
Replacement of Care First
Replacement of Care First
Planned End Date Forecast End Date

Page 31

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials 50 43 86% 51 1 1%
Current Year Financials 7 0 0% 8 1 10%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
3
Project Life Financials 40 5 12% 40 (0) 0%
Current Year Financials 35 0 0% 35 0 0%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 30-Sep-23 30-Sep-23
Main Issues / Reason for Variance
The various claim forms and departmental reports have been reviewed and updated and the relevant online request forms were submitted to the
Digital Sub-Group to be converted to Online Achieve Forms.  The various claim forms and departmental reports have now been converted to
Online Achieve Forms and are in the process of being tested. Once complete, the supplier will take matters forward with their design team. An
anticipated timeline for completion of the project, taking into account the various stages i.e. development, testing, going live etc. will be drawn up
in conjunction with the supplier at that time.  Budget spend anticipated in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Upgraded version with PCI compliant telephone payment system.
Electronic Insurance System
Acquisition of a claims/incident management system supported by an electronic document management
system.
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
Payment Card Industry Data Security Standard (PCIDSS)
Module would ensure that WDC were compliant with the current requirements of PCIDSS for card payments
without the need for numerous costly workarounds
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget was rephased to 2022-23 as version upgrade of the Council's cash receipting system is required beforehand and is currently underway.
Anticipated Outcome
Upgraded Electronic Insurance System.
Enhancements to Cash Receipting System
Main Issues / Reason for Variance
Budget was rephased to 2022-2023 as this is a number of mini projects and the first part is the version upgrade which is actively progressing.
After this upgrade we can move onto other enhancements which are anticipated to finish in September 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Enhancements to the cash receipting system including PCI compliant telephone payment system.
To enhance the cash receipting system in the way payments are made and allocated to back office by
increasing the level of security that is required for online payments made by customers
Planned End Date Forecast End Date
Planned End Date Forecast End Date

Page 32

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
4
Project Life Financials 60 5 8% 60 0 0%
Current Year Financials 25 0 0% 25 0 0%
Project Description
Project Manager Adrian Gray
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 31-Oct-22
5
Project Life Financials 5 0 0% 5 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Jackie Nicol Thomson
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
6
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 1,000 0 0%
Project Description
Project Manager Gillian McNeilly
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
Main Issues / Reason for Variance
Delays in completion of required data cleansing prior to the upgrade have caused the start of the upgrade to be deemed too close to the financial
year end to risk disruption to preparation of the draft final accounts. The upgrade will be delayed until October 2022.
Cost of Living
To support Council and community organisations with capital costs for cost of living initiatives.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Working Group currently developing proposals for initiative.
Mitigating Action
None required
Anticipated Outcome
Initialive will assist with cost of living crisis
IFRS 16 Database
This is a system which will ensure that WDC has the correct level of information and adheres to correct
reporting of IFRS16 - Leasing. 
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The purchase of software to allow new accounting treatment of leases to be appropriately reported is on track. Full spend anticipated FY
2022/2023.
Mitigating Action
None required
Anticipated Outcome
Purchase of software for accounting for leases.
Mitigating Action
None possible at this time.
Anticipated Outcome
Development of Agresso system later than originally anticipated but within original budget.
Agresso development
The purpose of this project is to carry out an upgrade of the Agresso Finance System which was last
upgraded in 2015. The requirement to upgrade is to maintain a level of support available from Unit 4 who
have advised that support for older versions of the system is being reduced.
Planned End Date Forecast End Date

Page 33

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
7
Project Life Financials 53 13 25% 53 0 0%
Current Year Financials 33 0 0% 33 0 0%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
8
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 10 0 0% 10 0 0%
Project Description
Project Manager Pamela Clifford
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
9
Project Life Financials 83 0 0% 83 0 0%
Current Year Financials 83 0 0% 83 0 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Physical works being carried out by 31/3/23.
Anticipated Outcome
Preservation of Historic Site.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment Scotland) Rediscovering the Antonine Wall
project will be paid by the end of the financial year.
Mitigating Action
None Required.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works are integrated with the new Baths refurbishment. Await design proposals from Vital for approval. Works to be complete by 31 March 2023
to compliment the district heating installation.
Mitigating Action
None available at this time.
Replace existing main hall Air Handling unit at Clydebank Town Hall
Replace existing main hall Air Handling unit at Clydebank Town Hall.
Re -imagine Antonine Wall  
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment
Scotland) Rediscovering the Antonine Wall project which is also funded by the Heritage Lottery Fund.
Trainee solicitor in place. Budget will be fully spent.
Mitigating Action
None required at this time.
Anticipated Outcome
Solicitor support for Capital Projects, with full budget spend anticipated.
Solicitor Project Support for Capital Projects
Solicitor costs to directly support capital projects
Planned End Date Forecast End Date
Main Issues / Reason for Variance

Page 34

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
10
Project Life Financials 20 13 66% 20 0 0%
Current Year Financials 7 0 0% 7 0 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
11
Project Life Financials 85 55 64% 85 (0) 0%
Current Year Financials 30 0 0% 27 (3) -10%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
12
Project Life Financials 16 14 85% 16 0 0%
Current Year Financials 2 0 0% 2 (0) 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Water Meter Downsize.
Anticipated Outcome
Delivery of project within budget.
Mitigating Action
None required.
Anticipated Outcome
Anticipate some spend this year and the remainder to be rephased into 2023/24.
Automatic Meter Readers - Water
Automatic Meter Readers.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Water meter works to be carried out in the last quarter of the year. Previous works with electricity meter supplier did not meet expectations. Await
resolutions before issuing further orders.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project integrated with Water AMR project. All works to be carried out in the last quarter of the year when the existing AMR contract requires
renewal. Expect full spend.
Mitigating Action
None required
Water Meter Downsize
Mitigating Action
None required.
Anticipated Outcome
Delivery of project with full budget spend.
Replace failed heating controls/valves & recommission
Replace failed heating controls/valves & recommission.
Planned End Date Actual End Date
Main Issues / Reason for Variance
Further works ordered. Expect full spend by 31 March 2023.

Page 35

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
13
Project Life Financials 50 0 0% 50 0 0%
Current Year Financials 50 0 0% 50 0 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
14
Project Life Financials 2,188 66 3% 1,651 (538) -25%
Current Year Financials 1,651 66 4% 1,250 (401) -24%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-24
15
Project Life Financials 9,782 4,948 51% 9,797 15 0%
Current Year Financials 2,223 50 2% 2,075 (148) -7%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Progress towards delivery of planned projects from Economic Development Strategy and Charrette Action Plans albeit later than originally
anticipated.
Lighting upgrades to LED in schools and Corporate buildings
Upgrade lighting in schools and corporate buildings.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The remaining Regeneration Fund projects are Dumbarton Waterfront Path; the contribution towards the costs of Glencairn House; Connecting
Dumbarton; and the Scottish Marine Technology Park at the former Carless site. As Levelling Up Fund is programmed to be spent before
Regeneration Fund for Glencairn House and Connecting Dumbarton, it is not anticipated that any Regeneration Fund will be spent on these
projects during this financial year and will be carried forward. Spend against The £2.0m Clyde Mission funding for SMTP will continue during the
financial year 2022/2023 before an agreement is reached on the £2.0m of Regeneration Fund investment. Dumbarton Waterfront Path will be
developed according to landowner timescales, and only some spend is anticipated this year.
Mitigating Action
Programme management approach to delivery.
Mitigating Action
None available at this time.
Anticipated Outcome
Improved town centres and strategic sites across West Dunbartonshire.
Regeneration Fund
Funding to implement major regeneration projects linked to community charrettes. 
Regeneration/Local Economic Development
Budget to facilitate the delivery of Regeneration throughout West Dunbartonshire, aligned to the Economic
Strategy. External funding will be sought to maximise opportunities for redevelopment of these sites.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
LED budget is invested across our town centres and strategic sites and is used to develop and implement projects as well as providing match
funding to lever in external funding. During 2022/2023 the key projects to be developed and delivered include a contribution towards Smollett
Fountain public realm, enabling works at Mitchell Way subject to the timescale of the developer, development costs associated with Dumbarton
Waterfront, the Arc of Attraction Strategy and in Clydebank implementation of the Development Framework and delivery of the Activities Centre.
Many regeneration projects are subject to factors outwith Council control and close monitoring of the programming is required. A contingency is
included for increasing costs and new funding opportunities.
Initial works planned to be done at Knoxland and Gavinburn Primary schools during the October school holiday.
Mitigating Action
None available at this time.
Anticipated Outcome
Works complete 2022/23

Page 36

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
16
Project Life Financials 1,166 1,023 88% 1,166 0 0%
Current Year Financials 143 0 0% 143 0 0%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
17
Project Life Financials 1,456 139 10% 1,456 0 0%
Current Year Financials 1,317 0 0% 1,112 (205) -16%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
18
Project Life Financials 125 68 55% 125 0 0%
Current Year Financials 69 12 17% 69 0 0%
Project Description
Project Manager Gillian McNamara
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 30-Jun-23
Levelling Up
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and
transformational regeneration.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This capacity funding was awarded by UK Government to assist with development of LUF bids. WDC has been awarded a grant from LUF
Round 1 and the capacity funding will be used in part to produce Artizan Centre redevelopment options. The balance will be used for
Roads/Transportation to develop a major transportation bid for LUF2.
Mitigating Action
None available at this time.
Anticipated Outcome
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and transformational regeneration.
Town Centre Fund
Scottish Government funding to help improve local town centres.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The remaining Town Centre Fund will be spent on the Smollett Fountain public realm works which will be completed by the end of the financial
year.
Mitigating Action
None available at this time.
Anticipated Outcome
Regenerated Town Centres.
Mitigating Action
Programme involves  expenditure over a number of projects led by different services. Regular reporting between services will help early
identification of risk.
Anticipated Outcome
Place-based improvements that advance Scottish Government's priorities of 20 minute neighbourhoods and carbon zero.
Place Based Investment Programme
Scottish Government Funding to establish a Place-Based Investment Programme to ensure that all place
based investments are shaped by the needs and aspirations of local communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The budget includes a £0.641m contribution to Titan Boulevard at Queens Quay and £0.441m towards implementation of Alexandria Masterplan
projects.

Page 37

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
19
Project Life Financials 11,220 0 0% 11,220 0 0%
Current Year Financials 3,720 0 0% 3,720 0 0%
Project Description
Project Manager Patricia Rowley/ Craig Jardine
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
20
Project Life Financials 34,050 2,774 8% 34,049 (1) 0%
Current Year Financials 986 94 10% 986 (0) 0%
Project Description
Project Manager Patricia Rowley/ Craig Jardine
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-27 31-Mar-27
Mitigating Action
None required.
Anticipated Outcome
Delivery of the project on time and within the increased budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Regular updates are provided at every Council meeting and monthly Project Board meetings and to City Deal.  The main issues contained within
the new Council's approved Outline Business Case are still valid, which include Exxon's remediation strategy, land transfer arrangements and
issues relating to adjoining owners.  WDC Consultants are monitoring the remediation process to ensure compliance with specification, also
Esso are independently monitoring the remediation works.  Final Business Case submission is November 2022. Through the Scape framework
we are working closely with Balfour Beatty to achieve a formal pre construction agreement to allow the detailed design works to commence and
the full construction programme to be developed. Agreements in principle are progressing with third party land owners.
Main Issues / Reason for Variance
Network expansion to GJNH (Golden Jubilee National Hospital) will commence pending approval to proceed by the GJNH Board. 
Mitigating Action
None available at this time.
Anticipated Outcome
Project will be delivered on budget.
District Heating Network Expansion
District Heating Network Expansion.
Planned End Date Forecast End Date
Exxon City Deal
As part of the City Deal project the WDC Exxon site at Bowling regeneration with alternative A82 route
included.

Page 38

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
21
Project Life Financials 15 4 24% 15 0 0%
Current Year Financials 11 0 0% 11 0 0%
Project Description
Project Manager Stephen Daly
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
22
Project Life Financials 421 232 55% 421 (0) 0%
Current Year Financials 91 3 3% 91 (0) 0%
Project Description
Project Manager David Main
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
23
Project Life Financials 3,987 1,185 30% 4,000 13 0%
Current Year Financials 1,662 (2) 0% 1,662 0 0%
Project Description
Project Manager Sarah Christie/Michelle Lynn
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
Heritage Capital Fund
Heritage Capital Fund.
Main Issues / Reason for Variance
Work is underway to progress furniture replacement at Dumbarton, Duntocher and Parkhall libraries during 2022/2023.  Budget of £0.1m has
been rephased to  next financial year for Dalmuir library as work is currently scheduled for 2023/2024.
Mitigating Action
None required.
Anticipated Outcome
Project carried forward to align with Asset Management programme.
Anticipated Outcome
Project to be delivered on budget and within revised timescale.
Planned End Date Forecast End Date
None available at this time.
Anticipated Outcome
Review of service requirements & telephony functionality will inform works to improve citizen experience.
Transformation of Infrastructure Libraries and Museums
To improve performance and efficiency of Council's Libraries and Cultural Services.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Improvements to Contact Centre telephony were completed as scheduled during 2021/2022.  Further works have been scoped and agreed for
improvement to Housing telephony, benefiting both residents and the Council.  A review of the out of hours service is currently being undertaken
including work to upgrade telephony.  Any works will also incur professional fees for necessary scripting works.  We are also exploring call
recording technology across all the Contact Centre telephony.  It is anticipated these projects will be completed during the financial year
2022/2023.
Mitigating Action
None required.
Telephone System Upgrade
To improve Housing Repairs telephone platform for incoming calls, providing improved Management
Information.
Main Issues / Reason for Variance
The original projected spend has been affected by internal and external delays due to the Covid 19 recovery, a reduction in the scope of the
Clydebank Town Hall project, a change in the delivery date for the Clydebank Museum at Clydebank Library during the contract award stage,
while the new Dalmuir Library and Gallery had to be rescheduled for approval in August 2021. Officers are now making progress to get projects
back on track, projects will still be delivered in full, and a review of optimism bias will be undertaken in the projections for 2022/23.
Mitigating Action

Page 39

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
24
Project Life Financials 1,700 43 3% 1,590 (110) -6%
Current Year Financials 1,590 43 3% 1,590 0 0%
Project Description
Project Manager Michelle Lynn/ Sarah Christie
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
25
Project Life Financials 40 0 0% 40 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Manager John Anderson
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-22 31-Mar-23
26
Project Life Financials 8,535 169 2% 8,535 (0) 0%
Current Year Financials 1,715 51 3% 1,715 0 0%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-25 31-Mar-25
Main Issues / Reason for Variance
Design Team have been appointed to develop feasibility options for the DRP Project, currently in stage 1 of this phase reviewing service
requirements.  The conclusion of the feasibility report will provide input for the options appraisal exercise.  The intention would be to bring a
business case to a future IRED Committee.
Mitigating Action
None available at this time.
Anticipated Outcome
Project business case will be brought back to project board, IRED and Council.
Depot Rationalisation
Depot Rationalisation.
Planned End Date Forecast End Date
Mitigating Action
None required
Anticipated Outcome
New floor fitted in Alexandria Community Sports Hall.
Alexandria Community Centre Sports Hall re-flooring
Alexandria Community Centre Sports Hall re-flooring
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The Alexandria Community Centre Sports Hall continues to be utilised as COVID-19 vaccine centre during 2022/23 and the work will be
postponed until the last quarter of the financial year.
Main Issues / Reason for Variance
Project in design phase and planning application submitted August 2022.
Mitigating Action
None available at this time.
Anticipated Outcome
Re-development of Glencairn House in Dumbarton High Street to a purpose built library and museum, within budget albeit later than originally
anticipated.
Glencairn House
Re-development of Glencairn House in Dumbarton High St to a purpose built library and museum.
Planned End Date Forecast End Date

Page 40

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
27
Project Life Financials 1,912 353 18% 1,912 0 0%
Current Year Financials 1,912 353 18% 1,912 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-23 31-Mar-23
28
Project Life Financials 350 9 3% 350 0 0%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-24 31-Mar-24
29
Project Life Financials 150 16 11% 150 0 0%
Current Year Financials 134 0 0% 134 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-23
Anticipated Outcome
To deliver new sports changing facility.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project had been delayed due to a number of COVID-19 related issues and utilities issues.  Unit is now in production but delay to site due to the
utility disconnection and demolition works. Demolition works complete and waiting for a date for installation.
Mitigating Action
None available at this time.
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
Main Issues / Reason for Variance
The budget for this project has been rephased to FY 2023/2024.
Mitigating Action
None available at this time.
Anticipated Outcome
To deliver new sports changing facility.
Anticipated Outcome
Full budget spend anticipated.
New Sports Changing Facility Dumbarton West (Old OLSP site) 
New Sports Changing Facility Dumbarton West (Old OLSP site) 
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing.
Mitigating Action
None available at this time.
Building Upgrades and H&S - lifecycle & reactive building upgrades
Lifecycle and reactive building upgrades.

Page 41

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
30
Project Life Financials 150 0 0% 150 0 0%
Current Year Financials 150 0 0% 150 0 0%
Project Description
Project Manager Michelle Lynn
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-25 31-Mar-25
31
Project Life Financials 78 0 0% 78 0 0%
Current Year Financials 78 0 0% 78 0 0%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
32
Project Life Financials 45 0 0% 45 0 0%
Current Year Financials 45 0 0% 45 0 0%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
Main Issues / Reason for Variance
It is anticipated that spend will be achieved by the end of the financial year 2022/2023.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within budget.
Anticipated Outcome
Project delivered within budget.
Elevated Platforms (Building Services)
Elevated Platforms (Building Services).
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Welfare Units will be purchased by the end of the financial year.
Mitigating Action
None available at this time.
Purchase of 3 Welfare Units
At Council meeting on 30th August 2017 it was agreed to purchase 3 Welfare Units as a spend-to-save
proposal.
Changing Places Toilet Provision
Changing places toilet provision in four public buildings - Balloch bus stance toilets, Concord Community
Centre, Dalmuir Community Centre and Clydebank East Community Centre.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Plans have been prepared and projects will be progressed by the end of the financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within budget.

Page 42

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
33
Project Life Financials 912 849 93% 912 0 0%
Current Year Financials 80 17 21% 80 0 0%
Project Description
Project Manager Elaine Troup
Chief Officer Peter Barry
Project Lifecycle 31-Mar-23 31-Mar-23
34
Project Life Financials 100 23 23% 100 (0) 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Manager Graham Watters
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
35
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 50 0 0% 50 0 0%
Project Description
Project Manager John Kerr
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
Main Issues / Reason for Variance
Project was initially stalled due to COVID-19 restrictions, however as these are easing Officers have now carried out a consultative exercise and
initiated a site inspection to develop the work programme for 2022/2023.
Mitigating Action
Officers carried out some proactive consultative work to establish the tenant priorities this will allow the work programme to be developed
timeously.
Anticipated Outcome
It is expected the works programme  will be completed during 2022/2023.
Anticipated Outcome
Development of IHMS system.
Dennystoun Forge Site Improvements
Dennystoun Forge Site Improvements
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Development of system progressing, with full budget spend anticipated to be incurred in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Full spend is anticipated on this year's budget.
Integrated Housing Management System
Development of IHMS system.
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve coordinated
service delivery in response to community need. This is complimented by community capacity building,
empowering WD citizens to do more for their own communities (leading to less reliance on council).  Also
included is the implementation of participatory budgeting to support and build capacity in communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application process is planned for later in this financial year.

Page 43

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
36
Project Life Financials 405 7 2% 405 0 0%
Current Year Financials 405 7 2% 405 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
37
Project Life Financials 1,726 1,718 100% 1,726 0 0%
Current Year Financials 13 5 38% 13 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
38
Project Life Financials 50 37 73% 50 (0) 0%
Current Year Financials 13 0 0% 13 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Sustainable burial environment for local residents.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget will be used to develop an area of the existing Cemetery for additional burials.  Project scope has now been developed and will be
tendered under the minor civils framework.  Budget spend anticipated in 2022/2023.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Improvements to the environment of West Dunbartonshire.
Kilmaronock Cemetery Extension
Extension of existing cemetery at Kilmaronock. 
Environmental Improvement Fund
This fund has been created to deliver environmental improvement projects for communities throughout West
Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Remaining budget rephased from 2021/2022 to progress with tree planting in 2022/2023 in line with the Councils Climate Change and
Biodiversity action plans.  Full budget spend anticipated.
Mitigating Action
None required at this time.
Anticipated Outcome
Better access with parks, cemeteries and open spaces.
Public non-adopted paths and roads
Upgrades to drainage and lighting to enhance the lifespan of paths and roads within  facilities in public parks,
cemeteries and civic spaces.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects are currently being developed to deliver better access in our parks, cemeteries and open spaces. Full budget spend anticipated in
2022/2023.

Page 44

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
39
Project Life Financials 220 214 97% 220 0 0%
Current Year Financials 7 0 0% 7 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 03-Apr-21 31-Mar-22
40
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
41
Project Life Financials 1,365 59 4% 1,365 (0) 0%
Current Year Financials 122 0 0% 122 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Resurfacing of 3G pitch at East End Park.
Project works complete.  Retentions to be paid in 2022/2023.
Mitigating Action
None required at this time.
Development of play areas to improve accessibility and inclusiveness of play areas throughout West Dunbartonshire. Projects are being
developed for implementation over the next five years.
Mitigating Action
None required at this time.
Anticipated Outcome
Renewal of play parks
East End Park Resurfacing
Resurfacing of 3G pitch at East End Park.
Anticipated Outcome
New all weather tennis courts.
Play Parks Grant Funding
Renew and replace play park equipment
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Main Issues / Reason for Variance
Planned End Date Actual End Date
Sports Facilities Upgrades - Argyll Park - Construction of 3 All Weather Tennis Courts
Project is part of wider investment in sporting facilities and is dependent on match funding from Sports
Scotland. Agreement in principle to wider WDC strategic priorities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultant and design team fees for resurfacing of 3G pitch at East End Park.
Mitigating Action
None required.
Anticipated Outcome

Page 45

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
42
Project Life Financials 210 0 0% 210 0 0%
Current Year Financials 10 0 0% 10 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 30-Nov-23 30-Nov-23
43
Project Life Financials 25 0 0% 25 0 0%
Current Year Financials 25 0 0% 25 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
44
Project Life Financials 228 0 0% 228 0 0%
Current Year Financials 228 0 0% 228 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Nature Restoration Fund
Nature resource for Faifley Community
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Nature resource for Faifley Community
Large bins for high traffic areas (pilot)
Supply and install extra large litter bins as a pilot project within hotspot problem areas.
Planned End Date Forecast End Date
Funding received from Nature Restoration Fund to build nature resource for Faifley community has been completed and additional funding has
been received and projects are currently being developed and to be delivered by March 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Balloch Mountain Bike Track
Develop a mountain bike skills trail at Balloch Castle Country Park.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Design fees to develop Mountain bike skills trail in Balloch country park. Application will be submitted to Sport Scotland for match funding. Project
to commence April 2023 and works to be complete by November 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Mountain bike track
Main Issues / Reason for Variance
Supply and install extra large litter bins as a pilot project within hotspot problem areas. Project will commence when the order is received and
completion is anticipated by March 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Large bins provided for high traffic areas

Page 46

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
45
Project Life Financials 740 350 47% 350 (390) -53%
Current Year Financials 390 0 0% 0 (390) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Jul-22 31-Jul-22
46
Project Life Financials 683 6 1% 566 (117) -17%
Current Year Financials 683 6 1% 566 (117) -17%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
47
Project Life Financials 203 0 0% 107 (96) -47%
Current Year Financials 107 0 0% 107 (0) 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23Forecast End Date
Main Issues / Reason for Variance
Projects and locations still to be decided.
Main Issues / Reason for Variance
To develop projects including Balloch Park Phase 2, and other projects principally around National Cycle Network 7 and further pedestrian
dropped kerbs.
Mitigating Action
None required at this time.
Anticipated Outcome
To improve connectivity and enhanced Cycling routes within West Dunbartonshire.
Spaces for People
Funding has been awarded from Sustrans to assist with social distancing measures required as a result of
the COVID-19 pandemic.
Planned End Date
Mitigating Action
None required at this time.
Anticipated Outcome
To provide people of West Dunbartonshire additional space to help adhere to social distancing guidelines.
Forecast End Date
Main Issues / Reason for Variance
The programme is now complete and there will be no further expenditure.
Mitigating Action
None required at this time.
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Footways/Cycle Path Upgrades
Renewal and/or enhancement of failed footpaths/cycle paths through West Dunbartonshire.
Planned End Date
Cycling, Walking and Safer Streets
Introduction of enhanced walking routes and traffic calming schemes to introduce safer streets within West
Dunbartonshire.
Planned End Date Forecast End Date

Page 47

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
48
Project Life Financials 200 0 0% 5 (195) -97%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
49
Project Life Financials 60 55 91% 60 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
50
Project Life Financials 314 215 68% 314 (0) 0%
Current Year Financials 100 0 0% 100 (0) 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Funding has been received from Turnberry Homes and will be used to introduce traffic calming and traffic
management measures to mitigate the impact of additional traffic accessing the housing development off
Castle Road, Dumbarton.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultation completed 2021/2022 and speed humps will be installed prior to 31 March 2023.
Anticipated Outcome
To provide Electric Vehicle Charging points within West Dunbartonshire.
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget to be used for retention payment from last years surfacing of Dumbarton East footways.
Mitigating Action
None required at this time.
Additional Pavement Improvements
Extra funding to accelerate pavement maintenance and improvements across West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Charging points to be installed at Moss O' Balloch park by the end of this financial year.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Traffic calming to be installed in Dumbarton East.
Electrical Charging Points - Rapid Charge
Funding has been awarded from Transport Scotland for the Installation of electrical charging points
Turnberry Homes - traffic calming/ management at Turnberry housing development off Castle Road

Page 48

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
51
Project Life Financials 1,257 0 0% 1,257 0 0%
Current Year Financials 1,257 0 0% 1,257 0 0%
Project Description
Project Manager Raymond Walsh/ Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
52
Project Life Financials 500 0 0% 500 0 0%
Current Year Financials 500 0 0% 500 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
53
Project Life Financials 149 19 13% 149 0 0%
Current Year Financials 149 19 13% 149 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Intention is to complete works within budget.
Infrastructure - Flooding
Essential renewal of failed drainage assets to minimise flood risk within West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Small value projects to tackle flooding events in various areas.
Main Issues / Reason for Variance
A detailed design for Gruggies Burn will be undertaken by the end of the financial year.
Mitigating Action
None required at this time.
Anticipated Outcome
Project should be complete within budget.
Flood Risk Management
Enhancement of drainage infrastructure to ensure compliance with Flood Risk Management Act 2009.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Plans are under consideration by officers.
Mitigating Action
None required at this time.
Anticipated Outcome
Projects should be complete within budget.
Flood Prevention
Various flood prevention projects.
Planned End Date

Page 49

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
54
Project Life Financials 800 181 23% 800 0 0%
Current Year Financials 620 0 0% 620 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
55
Project Life Financials 1,627 5 0% 1,075 (552) -34%
Current Year Financials 1,627 5 0% 1,075 (552) -34%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
56
Project Life Financials 3,444 21 1% 3,444 0 0%
Current Year Financials 3,444 21 1% 3,444 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Intention is to complete various surfacing works by the end of March 2023.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Roads Operations are progressing an extensive surfacing program and have a number of schemes to be completed by the end of the financial
year.
Mitigating Action
None required at this time.
Infrastructure - Roads
Infrastructure - Roads.
Main Issues / Reason for Variance
Work will be undertaken during this financial year for A8014 Kilbowie Road, Balloch Station Park & Ride and Bus Infrastructure Improvements.
A814 Congestion measures contractor arrived on site mid-August. Works are progressing well and completion expected by the end of December
2022 . All of these projects will be undertaken by Roads Services.
Mitigating Action
None required at this time.
Anticipated Outcome
Improve accessibility to Public Transport and improve journey time reliability.
Anticipated Outcome
Project should be completed within budget.
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements & Park and Rides
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Awaiting outcome of Scottish Government & SEPA deliberations, however officers are hopeful full budget spend can be incurred by the end of
the financial year.
Mitigating Action
None required at this time.
River Leven Flood Prevention Scheme
River Leven Flood Prevention Scheme.

Page 50

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
57
Project Life Financials 12 8 61% 12 0 0%
Current Year Financials 12 8 61% 12 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
58
Project Life Financials 97 35 36% 97 (0) 0%
Current Year Financials 55 0 0% 55 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
59
Project Life Financials 15,053 421 3% 15,053 (0) 0%
Current Year Financials 1,524 0 0% 1,524 0 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Project should be completed within budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget to be used for a detailed design for Gruggies Burn.
Mitigating Action
None available at this time.
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Gruggies Burn Flood Prevention
Commission of Gruggies Flood Prevention Scheme.
Depot Improvement Works
Improvement of WDC Roads Depot.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget will be utilised for depot rationalisation works during the financial year.
Main Issues / Reason for Variance
Budget will be used for any service work carried out by Scottish Power before or after column replacement works.
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Street lighting and associated electrical infrastructure
WDC is responsible for the maintenance of 18,000 street lighting columns and associated illuminated signs
and bollards.  This budget is required for this infrastructure.
Planned End Date Forecast End Date

Page 51

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
60
Project Life Financials 2,325 1,007 43% 2,325 0 0%
Current Year Financials 693 0 0% 693 (0) 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
61
Project Life Financials 2,325 0 0% 2,325 0 0%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
62
Project Life Financials 4,300 3,829 89% 4,300 (0) 0%
Current Year Financials 498 27 5% 498 (0) 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
Project should be completed within budget enhancing the A814 through Clydebank.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works substantially complete. Additional works as a compensation event started on Wallace street in July 2022.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
Clydebank Charrette, A814
Clydebank Charrette, A814
A813 Road Improvement Phase 2
A813 Road Improvement Phase 2.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
These works are not due to commence until Phase 1 has been completed.
Main Issues / Reason for Variance
Plans have been developed for carriageway widening and footway and cycleway construction between Strathleven and Lions Gate.  There are
ongoing discussions with Aggreko and other land owners in regards to access and land acquisition with construction commencing during
2022/2023.
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
A813 Road Improvement Phase 1
A813 Road Improvement Phase 1.
Planned End Date Forecast End Date

Page 52

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
63
Project Life Financials 3,930 3,846 98% 3,846 (84) -2%
Current Year Financials 84 0 0% 0 (84) -100%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-May-21
64
Project Life Financials 1,039 651 63% 1,039 (0) 0%
Current Year Financials 117 8 7% 117 (0) 0%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
65
Project Life Financials 80 0 0% 80 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
Purchase of Roads plant and equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
New Plant to be purchased
Mitigating Action
None required.
Anticipated Outcome
To purchase equipment.
Main Issues / Reason for Variance
Works to Lomond Bridge were completed May 2021. No further costs expected.
Mitigating Action
None required.
Anticipated Outcome
To provide an improved Lomond Bridge.
Protective overcoating to 4 over bridges River Leven
To overcoat 4 bridges over River Leven.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works to Renton footbridge are now complete and work will commence on the other bridges.
Mitigating Action
None available at this time.
Anticipated Outcome
To upgrade bridges within West Dunbartonshire.
Roads Plant
A811 Lomond Bridge
Upgrade of Lomond Bridge.
Planned End Date Actual End Date

Page 53

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
66
Project Life Financials 350 0 0% 350 0 0%
Current Year Financials 350 0 0% 350 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
67
Project Life Financials 300 0 0% 300 0 0%
Current Year Financials 300 0 0% 300 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
68
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 1,000 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
Traffic Signal Upgrades
Upgrade Traffic Signals
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
To upgrade traffic signals.
Roads improvements
Mitigating Action
None required.
Anticipated Outcome
Resurface footways.
Footway Resurfacing (RAMP)
Footway resurfacing
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Various road improvement projects
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
Improvements to roads

Page 54

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
69
Project Life Financials 100 0 0% 100 0 0%
Current Year Financials 100 0 0% 100 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
70
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 1,000 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
71
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Street sign renewal
Renewal of street signs
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
Renewal of street signage.
Pavement improvements
Various pavement improvement projects.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
Improvement to pavements.
Water Safety
To develop Water Safety Policy & enhance water safety equipment in WDC
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Expenditure on water safety equipment will be made as required throughout the year.
Mitigating Action
None required
Anticipated Outcome
Water safety equipment as required.

Page 55

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
72
Project Life Financials 400 0 0% 400 0 0%
Current Year Financials 400 0 0% 400 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
73
Project Life Financials 1,980 0 0% 1,980 0 0%
Current Year Financials 180 0 0% 45 (135) -75%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
74
Project Life Financials 160 71 44% 160 0 0%
Current Year Financials 80 71 88% 80 0 0%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
75
Project Life Financials 1,110 199 18% 1,110 (0) 0%
Current Year Financials 441 11 3% 441 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-29 31-Mar-29
Main Issues / Reason for Variance
Delivery delayed by the supplier. Full budget spend expected before the end of the financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within  budget.
Purchase of gritters
Purchase of gritters.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultant project nearing completion and spend will be made thereafter.
Main Issues / Reason for Variance
Although there is slippage caused mainly by the academic year starting several months after the financial year the project is still on track to be
completed by the planned end date.
Mitigating Action
None available at this time.
Anticipated Outcome
Forecast End Date
Anticipated Outcome
Project delivered within  budget.
AV Equipment - Education
Purchase of AV Equipment for Education.
Planned End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Compactors have now been delivered.
Mitigating Action
None Required.
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within budget.
Replacement of compactors at Dalmoak civic amenity site
The purchase of 2 compactors for the Council civic amenity site at Dalmoak.
Waste Transfer Station
The design, development and construction of a recycling and bulk waste transfer facility that will ensure all
recycling material can be sorted and disposed off appropriately to ensure compliance with landfill ban in
2025.
Purchase of AV Equipment for Education.

Page 56

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
76
Project Life Financials 376 335 89% 376 (0) 0%
Current Year Financials 41 0 0% 41 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
77
Project Life Financials 20,241 15,280 75% 20,241 0 0%
Current Year Financials 1,005 464 46% 1,005 0 0%
Project Description
Project Manager Sharon Jump/ Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Project delivered within budget and to the revised programme, following COVID-19.
Digital Inclusion
Increase the ratio of chrome book devices for most disadvantaged children and families and support for
families with remote access.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Additional devices have been ordered to increase the ratio of devices to pupils as part of a commitment towards a 1:1 device ratio. The project is
on track to be fully spent in 2022/2023.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renton Campus: The overall construction is programmed to complete by 25 July 2022. (Previously April 2022 but re-programmed due to 13
week COVID-19 site closure).  Phase 1 of the project was handed over on Monday 18 October 2021, with pupils returning to the new school
campus on Wednesday 20 October 2021.  Phase 2 on schedule to be handed over 25th July 2022. There is an acceleration of spend due to part
retention being paid 22/23.   St Mary's:   anticipated commencement of MUGA is September 2022 which means new build kitchen will slip to June
2023.  Pitch onsite hopefully September and dining hall will be July 23 as cannot be onsite at the same time as pitch works.   Additional ASN
Provision: temporary accommodation for Choices will be in place September and plans for rebuild extension ongoing. Additional scoping in
respect of vacant space at Choices and former Riverside ELC ongoing.  Skills School: scoping ongoing.  Balloch Campus, Lomond Base,
artificial grass installation is complete.
Mitigating Action
None required
Mitigating Action
None required at this time.
Anticipated Outcome
Increase the Chromebook ratio for most disadvantaged children.
Schools Estate Improvement Plan
Improvement of Schools Estate.

Page 57

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
78
Project Life Financials 29,450 95 0% 29,450 (0) 0%
Current Year Financials 2,797 0 0% 2,797 0 0%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-26 31-Mar-26
79
Project Life Financials 750 637 85% 750 0 0%
Current Year Financials 113 0 0% 113 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
80
Project Life Financials 5,508 5,505 100% 5,508 (0) 0%
Current Year Financials 3 0 0% 3 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 30-Apr-21
Main Issues / Reason for Variance
Project complete and await final charges.
Mitigating Action
None required.
Anticipated Outcome
Project delivered on time and within budget
Anticipated Outcome
Project delivered on budget.
Schools Estate Refurbishment Plan
Completion of condition surveys has been carried out to identify works required to bring various schools from
Condition C to Condition B.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
A new contractor has been appointed and looking at the programme of works.
Mitigating Action
None available at this time.
Choices Programme - to assist young people who require additional support
Main Issues / Reason for Variance
The next phase of the Schools Estate Improvement Plan involves the development of a new Campus provision in the Faifley area. WDC has
been successful in securing funding from the Scottish Government Learning Estate Improvement Programme. SFT confirmed the indicative
funding allocation for this project at £18.416m on the 4 May 2021, this will be received as a revenue stream over the 25 years of the Scottish
Government financial support (subject to the Council adhering to the funding criteria). Site Options Appraisal has taken place and Members
approved the recommendation to proceed with the new Faifley Campus on the St Joseph's site at Education Committee on 9th June 2021.  The
design team and main contractor have been appointed and the next phase will see the design development for the new Campus taking place.
The statutory consultation process was launched in September 2021 and a report was brought back to the Educational Services committee in
March 2022 concluding the process.
Mitigating Action
None available at this time.
Anticipated Outcome
Delivery of the project will be on time.
Schools Estate Improvement Plan - next Phase - Faifley Campus
Improvement of Schools Estate.
Planned End Date Forecast End Date
Bringing together Central Support Services which will include relocation of Choices Programme.

Page 58

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
81
Project Life Financials 8,748 7,954 91% 8,748 (0) 0%
Current Year Financials 795 1 0% 795 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
82
Project Life Financials 1,150 1,136 99% 1,150 (0) 0%
Current Year Financials 26 12 45% 26 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 30-Apr-22
83
Project Life Financials 1,053 417 40% 1,053 0 0%
Current Year Financials 1,053 417 40% 969 (84) -8%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
The project will be completed to deliver the requirements of the Early Years expansion plans.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete and final account to be agreed.
Mitigating Action
None required.
Mitigating Action
None required at this time.
Anticipated Outcome
Dalmonach CE Centre
To create new community facilities with additional space for early years provisions.
Early Years Early Learning and Childcare Funding
Early learning and childcare funding awarded to West Dunbartonshire Council to facilitate the expansion in
entitlement to funded ELCC to 1140 hours from August 2020.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing and budget spend anticipated in 2022/23.
Main Issues / Reason for Variance
Provision of aids and adaptations to clients as required.
Mitigating Action
None available at this time
Anticipated Outcome
Provision of adaptations and equipment to HSCP clients as anticipated.
Anticipated Outcome
To create new community facilities with additional space for early years provisions.
Aids & Adaptations - Special Needs Adaptations & Equipment
Reactive budget to provide adaptations and equipment for HSCP clients.
Planned End Date Forecast End Date

Page 59

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
84
Project Life Financials 73 50 68% 73 0 0%
Current Year Financials 73 50 68% 73 0 0%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
85
Project Life Financials 1,422 422 30% 1,422 0 0%
Current Year Financials 1,422 422 30% 950 (472) -33%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
86
Project Life Financials 60 50 83% 60 0 0%
Current Year Financials 17 7 40% 17 0 0%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Oct-22 31-Oct-22
Criminal Justice Adaptations
Renovation of Unit 11 Levenside Business Court.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
Technical aspect of the project is complete and WDC assisting with user testing. Delayed but on budget.
Internet of Things Asset Tracking
Asset Tracking.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Technical aspect of the project is complete and WDC are assisting with user testing. Delayed but on budget.
Mitigating Action
Anticipated Outcome
Most of capital allocated to HSCP will be used to review/replace the current case management systems and will be rephased in line with the
project plan. Supply chain delays may continue to impact delivery and spend.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Some replacement Chrome book orders have been received by schools. Uplift and disposal of old devices being scheduled. Planning for MOB
replacements to be issued to users but dependency on In Tune module of 365. Gathering inventory information for next batch of replacements.
Mitigating Action
Continue to escalate and meet framework suppliers to confirm delivery lead times.
Investigate other procurement routes as well as adjust the project scope to replace where stock allows.
ICT Modernisation
This budget is to facilitate ICT infrastructure and modernise working practices.
None available at this time
Anticipated Outcome
Renovation of Unit 11 Levenside Business Court
Main Issues / Reason for Variance
The construction of an office and storage refit with a mezzanine floor within an existing workshop unit which will include associated finishes
works and electrical installations. The multi-purpose new office space will accommodate two members of staff with an office base and allow
space to set up a training facility indoors. Project expected to be completed by 31 March 2023.

Page 60

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 5
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 August 2022
Budget Details
Project Life Financials
Spend to Date Variance
87
Project Life Financials 1,297 241 19% 1,297 0 0%
Current Year Financials 1,297 241 19% 1,000 (297) -23%
Project Description
Project Manager Brian Miller/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
88
Project Life Financials 450 189 42% 450 0 0%
Current Year Financials 173 11 7% 150 (23) -13%
Project Description
Project Manager Dorota Piotrowicz/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 30-Sep-23 30-Sep-23
89
Project Life Financials 3,502 53 2% 3,502 0 0%
Current Year Financials 3,502 53 2% 3,502 0 0%
Project Description
Project Manager N/A
Chief Officer N/A
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
Majority of budget spent but delayed.
None required.
Anticipated Outcome
Direct project support costs allocated as appropriate.
Direct Project Support
Business support cost such as reallocation of architects and project support at year end.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Salary Capitalisation in 2022/23.
ICT Security & DR
The project is for the enhancement of security systems, server replacement and the update of corporate
applications to ensure compliance with 15/16 PSN requirements, to enhance the disaster recovery
capabilities of WDC.
Main Issues / Reason for Variance
Project spend relates to internal and external resources to implement new systems, processes and user training skills. Mailbox migration aspect
of the project delayed until cloud backup is implemented (procurement of backup in progress and target implementation is October 2022
following tendering committee approval). Implementation of device management functionality in 365 is on target to go live in September 2022.
Information governance work stream baseline review is complete and implementation of action plan is at planning stage. Recruitment of
resources to train end users and carry out mail migrations has started.
Mitigating Action
Continue to monitor the various work streams to accelerate aspects of the project where possible if suppliers can provide resource. Continue to
assess where a) internal skills have developed, b) external resource is needed for introducing new functionality in the future to inform future
bidding cycles and c) temporary recruitment/secondment is required.
Anticipated Outcome
Anticipated Outcome
Anticipate the majority of budget being spent this financial year but some works are planned for the last quarter of the year for Public Sector
Network (PSN) annual compliance submission.
365 Implementation
Project services to delivery Microsoft 365 Implementation including 3rd party supplier, training, technical
consultancy etc.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Storage Area Network (SAN) delivered and installation planning underway. Switch replacement in schools completed during the summer break. 
Switch replacement for Church Street at planning stage as required down time. Server replacement at scoping stage.
Mitigating Action
Monitor supply chain issues. Continue tendering processes and implementation stages for each project.

Page 61

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (141) (99) 70% (419) (278) 197%
Current Year Financials (278) 0 0% (278) 0 0%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
2
Project Life Financials (75,127) (31,382) 42% (76,371) (1,244) 2%
Current Year Financials (5,574) (2,525) 45% (5,574) 0 0%
Project Description
Project Lifecycle 31-Mar-30 31-Mar-30
3
Project Life Financials (35,184) (4,705) 13% (35,184) 0 0%
Current Year Financials (959) (126) 13% (959) 0 0%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
4
Project Life Financials (11,216) (4,938) 44% (11,216) 0 0%
Current Year Financials (1,753) (1,199) 68% (1,753) 0 0%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
Match funding received.
None required.
Mitigating Action
Mitigating actions are detailed within the appropriate status updates.
Anticipated Outcome
Application of resources as appropriate.
Match Funding / Other Grants and Contributions
Match Funding / Other Grants and Contributions
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application of resources is dependent on capital project progressing in year as planned.
Mitigating Action
Application of resources is dependent on capital project progressing in year as planned.
Main Issues / Reason for Variance
General services capital grant is anticipated to be received as forecast.
Mitigating Action
None required at this time
Anticipated Outcome
General services capital grant is anticipated to be received as forecast.
Ring Fenced Government Grant Funding
This is ring fenced grant funding which is primarily anticipated to be received from the Scottish Government and
relates to Cycling, Walking, Safer Streets, Regeneration Placed Based Investment Programme, Early Years,
Gruggies Burn Flood works, Early Years funding, City Deal and Town Centre Fund.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Application of resources held on balance sheet as at 31 March 2022 as appropriate.
General Services Capital Grant
This is a general grant received from the Scottish Government in relation to General Services capital spend
Application of resources is dependent on capital project progressing in year as planned.
Spend to Date Forecast Variance
Resources Carried Forward
These are resources that have been received in previous years relating to Turnberry Homes, Town Centre Fund
Grant, Digital Inclusion, Clydebank Can on the Canal, Internet of Things Asset Tracking and Auld Street Bond.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
31 August 2022
Budget Details
Project Life Financials

Page 62

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 5
Budget Forecast Spend
£000 £000 % £000 £000 %
Spend to Date Forecast Variance
Resources Carried Forward
31 August 2022
Budget Details
Project Life Financials
5
Project Life Financials (25,429) (77) 0% (26,506) (1,077) 4%
Current Year Financials 0 0 #DIV/0! 0 0 #DIV/0!
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
6
Project Life Financials (124,728) (51,265) 41% (120,194) 4,534 -4%
Current Year Financials (57,013) (7) 0% (41,282) 15,731 -28%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
7
Project Life Financials (10) 0 0% (10) 0 0%
Current Year Financials (10) 0 0% (10) 0 0%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
CFCR applied to relevant capital project.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renovation of Unit 11 Levenside Business Court
Mitigating Action
None required at this time.
This is capital spend which is funded by revenue budgets
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved for the purposes of
funding capital expenditure
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery therefore mitigating action is detailed in the red and amber analysis.
Mitigating Action
None available at this time.
Anticipated Outcome
While prudential borrowing requirement is likely to be less than budgeted in the current financial year this is anticipated to catch up over the
programme life.
CFCR
Capital receipts received.
Capital Receipts
These are capital receipts that are anticipated from sales of land and buildings both as part of the normal disposal
programme and also as part of the business case investment in office rationalisation, new school building and
new care home development
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Receipts budgets are based on assumptions in relation to the sale of various sites. Not all sales will be realised this financial year. The main
ones being OLSP, St James retail park, Dalreoch Care Home. Queen's Quay, Levenbank Terrace, Heather Avenue, Crosslet House. As agreed
at Council receipts received are used firstly to pay for principle and premiums.
Mitigating Action
While market conditions are out with officers control all potential receipts will be explored.
Anticipated Outcome