DOCUMENT PACK (Council 31 08 22) Bookmarked

West Dunbartonshire Council · 31 August 2022
Back to West Dunbartonshire Council — 31 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda
West Dunbartonshire Council
Date:  Wednesday, 31 August 2022
___________________________________________________________________
Time:  16:00
___________________________________________________________________
Format:      Hybrid meeting
___________________________________________________________________
Contact:   Christine McCaffary, Senior Democratic Services Officer
Email: christine.mccaffary@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of West Dunbartonshire Council as detailed above. 
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:- 
Provost Douglas McAllister Councillor Michelle McGinty
Councillor James Bollan  Councillor June McKay
Councillor Karen Conaghan  Councillor John Millar
Councillor Ian Dickson  Councillor Lawrence O’Neill
Councillor Diane Docherty  Councillor Lauren Oxley
Councillor Craig Edward  Councillor Chris Pollock
Councillor Gurpreet Singh Johal  Councillor Martin Rooney
Councillor Daniel Lennie Councillor Gordon Scanlan
Councillor David McBride Councillor Hazel Sorrell
Councillor Jonathan McColl Councillor Clare Steel
Councillor James McElhill  Councillor Sophie Traynor 
Chief Executive
Chief Officers 
Date of issue:  18 August 2022 
Audio Streaming 
Please note: the sound from this meeting may be recorded for live and subsequent
audio streaming via the Council’s internet site.  At the start of the meeting, the
Chair will confirm if all or part of the meeting is being audio streamed. 
Audio recordings of the meeting (including the attendance or contribution of any
party participating or making a contribution) will be published on the Council’s
website and the Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site. 
If you have any queries regarding this and, in particular, if you believe that use
and/or storage of any particular information would cause, or be likely to cause,
substantial damage or distress to any individual, please contact the Chief Officer –
Regulatory and Regeneration on 01389 737800. 
Page 2

Page 3

WEST DUNBARTONSHIRE COUNCIL 
WEDNESDAY, 31 AUGUST 2022 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on the agenda and the reasons for such declarations. 
4 RECORDING OF VOTES 
The Council is asked to agree that all votes taken during the meeting will be
done by roll call vote to ensure an accurate record. 
5 MINUTES OF PREVIOUS MEETING 13 - 25 
Submit for approval, as correct record, the Minutes of Meeting of West
Dunbartonshire Council held on 22 June 2022. 
6 OPEN FORUM 
The following Open Forum questions have been submitted:- 
(a)  Question from Susan Dick – Land at Milton 
I own the field at Milton you want for the so called relief road. 
I’m currently being offered cash for my field with no guarantee of a home for
my ponies living or dead and no place for my shed, field shelter, trailers or
memorial trees. 
There are many other solutions available such as:- 
1. You are only using half of my field for the road, you could leave me the
unused half. 
Page 3

Page 4

2. You could test properly Sheepfold and guarantee it to me once the road
through it is finished. 
3.  One particular area at Overtoun is in your ownership and control, not
leased to anyone and has been used for horses before so it’s entirely
suitable, you’ve offered me a lease before of a much further away but
unsuitable area so you’re not averse to leasing out your own land for
horses – the area I mention is not part of any current lease to anyone and
you’ve owned it since 1939.  It has sat empty this whole time except for
the 6 months or so that horses were kept there so this is a real possibility
for it all to end amicably and swiftly.  No lease needs be broken to allow
me to have it, it’s a win win for everyone.  It’s a solution I’d happily take
subject to some alterations being allowed - safer fencing etc … nothing
you wouldn’t allow to some other leaser such as a community garden or
similar.  My ponies stay there till Sheepfold is ready and if Sheepfold
never materialises then I stay on with a permanent lease such as you
have given to others nearby. 
So my question to you all is - why can’t a solution be reached such as the
ones I have mentioned? 
(b) Question from Graham Parton – Land owned by Susan Dick
I am the partner of Susan Dick and together we run the little pony therapy
style business which this Council actually books for events.
We are not stopping your development, we have mentioned already the
alternatives to your current course of action.  If some promises made had
been kept then we would not be in this situation that we are now in.
My question to yourselves is …
At a meeting last September 2021 some promised information has never
been received by our appointed land agent or ourselves, which would help us.
Could you explain to us why this information was never received despite
several chasers from my agents and indeed a further open forum question in
December 2021 in regards to it in which Susan was told to be patient with
you?
The missing information is as follows…
1. A list of Council owned land to be given to my agent who would look over it
and identify if any was suitable, this land would then be discussed with the
parties involved. 
Page 4

Page 5

2.  Three specific areas of land known to be in West Dunbartonshire
Council’s ownership at the start of this process were to be looked at and
then discussed between the agents and myself as to suitability. 
(c) Question from Jim Thomson – Sheepfold 
As you will be aware, Susan is Dick an invaluable asset to all ages throughout
the area and WDC has a responsibility to ensure that a replacement site to
her current field is both appropriate and safe for her ponies. 
What I would like to ask therefore is that you undertake a detailed test of
Sheepfold to ensure that it is indeed safe and, if further decontamination is
required, that this be undertaken accordingly so she knows she has a home
for her ponies. 
This is something she has requested to be done for five years now and as
WDC owns the land it is unclear why you have not yet done so.  So could you
please resolve this issue as soon as possible. 
7 GLASGOW CITY REGION CITY DEAL UPDATE 27 – 34   
Submit report by the Chief Executive noting the progress with the
implementation of the Glasgow City Region, City Deal and seeking approval
to accelerate the drawdown of increased design costs required for the delivery
of the Full Business Case for the Council’s Exxon Infrastructure Project. 
8 EXXON LAND ACQUISITIONS 35 - 48 
Submit report by the Chief Officer – Supply, Distribution and Property providing
an update on progress made in negotiations with landowners and seeking
approval for acquisitions as detailed in the report. 
9 VENTILATION IN LEARNING ESTABLISHMENTS 49 - 53 
Submit report by the Chief Officer – Supply, Distribution and Property providing
an update on indicative costs in relation to ventilation across our learning
estate. 
10 WEST BRIDGEND HALL 55 - 58 
Submit report by the Chief Officer – Supply, Distribution and Property providing
an update on progress with the West Bridgend Hall project following the motion
to Council on 22 June 2022. 
Page 5

Page 6

11 REQUEST FOR NOMINATION TO THE SCOTTISH JOINT  59 - 60 
COUNCIL FOR LOCAL GOVERNMENT EMPLOYEES (SJC) 
Submit report by the Manager – Democratic and Registration Services asking
Council to consider a request from COSLA for nominations to the Scottish
Joint Council for Local Government Employees (SJC). 
12 AUDIT COMMITTEE ANNUAL REPORT 2021/22  61 - 66 
Submit report by the Chief Officer – Resources providing an overview of the
Audit Committee’s activity during the financial year 2021/22. 
13 UNAUDITED 2021/22 ANNUAL ACCOUNTS 67 - 292 
Submit report by the Chief Officer – Resources providing a copy of the
unaudited 2021/22 Annual Accounts together with information as to the
2021/22 outturn as set out in the draft accounts. 
14 GENERAL SERVICES BUDGETARY CONTROL REPORT 293 - 363 
TO PERIOD 4 
Submit report by the Chief Officer – Resources providing an update on the
General Services revenue budget and the approved capital programme to 31
July 2022. 
15 HOUSING REVENUE ACCOUNT (HRA) BUDGETARY 365 - 384 
CONTROL REPORT TO PERIOD 4 
Submit report by the Chief Officer – Resources providing an update on the
financial performance to 31 July 2022 of the HRA revenue and capital
budgets. 
16 NOTICE OF MOTIONS 
(a) Motion by Councillor Sophie Traynor – Clydebank Asbestos Group   
Council acknowledges the fantastic contribution made by Clydebank Asbestos
Group in the fight for justice for victims and their families. 
Council recognises the decade of support, help and advice which the
organisation has provided to people with asbestos-related conditions and their
families. 
Page 6

Page 7

Council requests that Provost McAllister holds a civic reception to mark the
group’s 30th anniversary in October. 
(b) Motion by Councillor June McKay – Council and Partners’ Emergency
Response to Dalmuir Fire       
This Council notes the fantastic response to the recent fire at Frank Downie
House in Dalmuir, a former 32 bed Residential Care Service. 
This was a major fire and its close proximity to houses meant that Clydemuir
Primary School was opened as an evacuation centre for those asked to leave
their homes. 
Council staff were on site in minutes including the Neighbourhood Team, Care
at Home, Education, Facilities Management, Homelessness, and our
resilience staff. 
Staff remained on site until the early hours of the morning providing help and
reassurance to local residents. 
This Council thanks the emergency services and all of our employees for their
response, but for the swift actions of emergency services the fire could have
devastated the homes and lives of the residents whose properties are in close
proximity to the site. 
(c) Motion by Councillor Gurpreet Singh Johal – Standing up for
Responsible Tax Conduct 
West Dunbartonshire Council notes that: 
1. The pressure on organisations to pay the right amount of tax in the right
place at the right time has never been stronger. 
2. Polling from the Institute for Business Ethics finds that “corporate tax
avoidance” has, since 2013, been the clear number one concern of the
British public when it comes to business conduct. 
3. Almost two-thirds (63%) of the Scottish public agree that the Government
and local councils should consider a company’s ethics and how they pay
their tax as well as value for money and quality of service provided, when
undertaking procurement. 
4. Around 15% of public contracts in Scotland have been won by companies
with links to tax havens. 
Page 7

Page 8

5. It has been conservatively estimated that losses from multinational profit-
shifting (just one form of tax avoidance) could be costing the UK some
£17bn per annum in lost corporation tax revenues. 
6. The Fair Tax Mark offers a means for business to demonstrate good tax
conduct, and has been secured by wide range of businesses across the
UK, including FTSE-listed PLCs, co-operatives, social enterprises and
large private businesses.
This Council believes that: 
1. Paying tax is often presented as a burden, but it shouldn’t be. 
2. Tax enables us to provide services from education, health and social care,
to flood defence, roads, policing and defence. It also helps to counter
financial inequalities and rebalance distorted economies. 
3. As recipients of significant public funding, local authorities should take the
lead in the promotion of exemplary tax conduct; be that by ensuring
contractors are paying their proper share of tax, or by refusing to go along
with offshore tax dodging when buying land and property. 
4. Where substantive stakes are held in private enterprises, then influence
should be wielded to ensure that such businesses are exemplars of tax
transparency and tax avoidance is shunned - e.g., no use of marketed
schemes requiring disclosure under DOTAS regulations (Disclosure Of
Tax Avoidance Schemes) or arrangements that might fall foul of the
General Anti-Abuse Rule. 
5. More action is needed, however, as current law significantly restricts
councils’ ability to either penalise poor tax conduct or reward good tax
conduct, when buying goods or services. 
6. UK cities, counties and towns can and should stand up for responsible tax
conduct - doing what they can within existing frameworks and pledging to
do more given the opportunity, as active supporters of international tax
justice.
West Dunbartonshire Council resolves to: 
1. Approve the Councils for Fair Tax Declaration. 
2. Lead by example and demonstrate good practice in our tax conduct, right
across our activities. 
3. Ensure contractors implement IR35 robustly and pay a fair share of
employment taxes. 
4. Not use offshore vehicles for the purchase of land and property, especially
where this leads to reduced payments of stamp duty. 
Page 8

Page 9

5. Undertake due diligence to ensure that not-for-profit structures are not
being used inappropriately as an artificial device to reduce the payment of
tax and business rates.   
6. Demand clarity on the ultimate beneficial ownership of suppliers and their
consolidated profit & loss position.
7. Promote Fair Tax Mark certification to  any business in which we have a
significant stake and where corporation tax is due. 
8. Support Fair Tax Week events in the area, and celebrate the tax
contribution made by responsible businesses who say what they pay with
pride. 
9. Support calls for urgent reform of EU, UK and Scots law to enable local
authorities to better penalise poor tax conduct and reward good tax
conduct through their procurement policies. 
(d) Motion by Councillor Chris Pollock – Dumbarton Football Club 150th
Anniversary 
Council commemorates and celebrates the 150th anniversary of Dumbarton
Football Club. 
West Dunbartonshire Council recognises that Dumbarton FC is the fourth
oldest professional football club in Scotland. The club has won two top league
titles, four lower league triumphs, the Scottish Cup and numerous promotions. 
Council commends the clubs place within our community with successful
initiatives over the years such as the “More choices, more chances
programme” as well as more recent outreaches across the community. 
Council asks the Provost to host a civic reception honouring the club and
wishes Dumbarton Football Club every success for the next 150 years. 
(e) Motion by Councillor David McBride - West Dunbartonshire Council calls for
the Immediate Release and Return to the UK of Jagtar Singh Johal, on the
Basis of His Continued Arbitrary Detention in India  
This Council notes that:-  
• Jagtar Singh Johal is a British national arbitrarily detained in India since 2017,
facing the death penalty as a result of politically motivated charges based on
a confession extracted under torture. He is a Sikh activist from Dumbarton
who sought to draw attention to human rights abuses against India’s Sikh
population, including in a blog post calling for accountability for historic anti-
Sikh pogroms. 
Page 9

Page 10

• The UN Working Group on Arbitrary Detention has found that under
international law, Jagtar’s detention is clearly arbitrary. They found that
Jagtar’s detention lacks any legal basis and that his fair trial rights have been
gravely violated, with him remaining in detention “apparently with no
evidence”. The UN body called for him to be immediately released.  
• Prime Minister Boris Johnson has recognized that Jagtar is arbitrarily
detained. It is UK Government policy to call for the release of arbitrarily
detained UK nationals overseas, but the Government has yet to do so in
Jagtar’s case. 
• Jagtar is at serious risk of a death sentence. At least two of the charges
against Jagtar carry the death penalty as a maximum punishment. The risk of
Jagtar being sentenced to death is very high given the politicized nature of his
case and the current political climate. Earlier this year, an Indian court
sentenced 38 people to death in a single case.[2]  
Given the above this Council agrees to:-  
1. Call on the Foreign Secretary to advocate for the release of Jagtar Singh Johal
and his return to the UK; 
2. Request that the Council’s Chief Executive write to the Convention of Scottish
Local Authorities (COSLA) regarding Jagtar’s case; and
3. Request that copies of this motion be distributed to all councils in Scotland
asking them to consider supporting for their consideration. 
(f) Motion by Councillor Ian Dickson - £1,000 for Every Household  
Labour in West Dunbartonshire campaigned on a manifesto pledge to put
£1,000 in the pocket of every West Dunbartonshire resident, with Scottish
Labour Leader Anas Sarwar telling the BBC on April 7th, that Labour led
Councils would be focused on such "bold policies to protect household
budgets.” 
Council notes that having an overall majority gives Labour the mandate and
ability to implement their election pledges as they see fit. 
Council therefore calls on officers to work with the Administration to bring
forward proposals for the Council to play our part in putting the promised
£1,000 into every West Dunbartonshire citizen’s pocket. 
(g) Motion from Councillor Jonathan McColl – Levenhowe / Ballagan Burn
Flood Prevention 
Council thanks officers for working with local Lomond Ward members and
Levenhowe residents during the previous term around flood prevention in the
area.
Page 10

Page 11

Council notes that a budget allocation was made in the 2022/23 budget to
deliver flood prevention works on Ballagan Burn identified by officers and
communicated to local members and residents. 
Council asks officers to provide an update to the next IRED Committee on the
proposed works and at the same time to produce a summary briefing that can
be emailed to Levenhowe residents to bring them up to date. 
(h) Motion by Councillor Karen Conaghan – Suicide Rate in West
Dunbartonshire 
Council is concerned that in West Dunbartonshire deaths by suicide continue
on an upwards trend.  We are all too aware of the link between social
deprivation and mental ill health.  The global pandemic of the COVID 19 virus
and now the subsequent cost of living crisis have only added to the levels of
depression and anxiety felt by many in our communities.  We all have a part to
play in helping prevent suicides and therefore Council requests a report be
brought to the next Council meeting outlining what we already do in terms of
suicide prevention work and what more could be done. 
Page 11

Page 12

Page 12

Page 13

WEST DUNBARTONSHIRE COUNCIL
At a Hybrid Meeting of West Dunbartonshire Council held in the Civic Space, 16
Church Street, Dumbarton on Wednesday, 22 June 2022, at 10.06 a.m.
Present: Provost Douglas McAllister and Councillors Jim Bollan, Karen
Conaghan, Ian Dickson, Diane Docherty, Craig Edward,
Gurpreet Singh Johal, Daniel Lennie, David McBride, Jonathan
McColl, James McElhill, Michelle McGinty, June McKay,
Lawrence O’Neill, Chris Pollock, Martin Rooney, Gordon
Scanlan, Hazel Sorrell, Clare Steel and Sophie Traynor.
Attending: Joyce White, Chief Executive; Peter Hessett, Chief Officer –
Regulatory and Regeneration (Legal Officer); Laurence Slavin,
Chief Officer – Resources and Section 95 Officer; Angela
Wilson, Chief Officer – Supply, Distribution and Property;
Victoria Rogers, Chief Officer – People and Technology; Peter
Barry, Chief Officer – Housing and Employability; Amanda
Graham, Chief Officer – Citizen, Culture and Facilities; Laura
Mason, Chief Officer – Education; Gail Macfarlane, Chief Officer
– Shared Services Roads and Neighbourhood; Lesley James,
Head of Children's Health, Care and Justice; George Hawthorn,
Manager – Democratic and Registration Services and Christine
McCaffary, Senior Democratic Services Officer.
Also attending: Christopher Gardner and Sanya Ahmed, Audit Scotland.
Apologies: Apologies for absence were intimated on behalf of Councillors
John Millar and Lauren Oxley.
Provost Douglas McAllister in the Chair
STATEMENT BY CHAIR
The Provost advised that the meeting was being audio streamed and broadcast live
to the internet and would be available for playback.
URGENT ITEMS OF BUSINESS
The Provost advised that he had received requests for two emergency motions to be
considered; one from Councillor McGinty in respect of the cost of living crisis and a
Item 5
Page 13

Page 14

second from Councillor Bollan in connection with rent abatements for small, local
businesses in Alexandria.
Both Elected Members relayed the terms of their emergency motions to the Council,
and the Provost agreed that the motions would be considered before agenda Item 14
– Notice of Motions.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda at this point in the meeting.
RECORDING OF VOTES
The Council agreed that all votes taken during the meeting would be done by roll call
vote to ensure an accurate record.
MINUTES OF PREVIOUS MEETINGS
The Minutes of Meetings of West Dunbartonshire Council held on 18 May 2022
(Statutory Meeting) and 25 May 2022 (Special Meeting) were submitted and
approved as correct records.
OPEN FORUM
The Council noted that no open forum questions had been submitted by members of
the public.
GLASGOW CITY REGION CITY DEAL UPDATE
A report was submitted by the Chief Officer – Regulatory and Regeneration noting
the progress with the implementation of the Glasgow City Region, City Deal.
After discussion and having heard the Chief Officer provide an update on the
drawing down of additional costs for producing the Full Business Case, Councillor
Rooney seconded by Councillor McGinty moved that the Council agrees:-
(1) to note the progress of the Glasgow City Region;
(2) to note progress of the Council’s City Deal project for the Exxon site and
approve submission of a change request to the City Region Project
Management Office to delay the submission of the Full Business Case until
June 2023; and
Page 14

Page 15

(3) to note the Council’s support for a Green Freeport bid as detailed in
paragraphs 5.3 to 5.7 of the report. 
The motion was agreed. 
Councillor Bollan, having failed to find a seconder for a proposed amendment,
requested that his dissent be recorded in respect of this item. 
FINANCIAL UPDATE 
A report was submitted by the Chief Officer – Resources providing an update on the
financial challenges facing the Council, the estimated 2023/24 and 2024/25 revenue
budget gaps, available COVID funds, and the approach to be adopted to identify
saving options to enable the Council to deliver a balanced 2023/24 budget. 
Councillor Rooney, seconded by Councillor McGinty moved:- 
This Council notes that the Scottish Government is the main funder of West
Dunbartonshire Council.  Council notes that for financial year 2022/23 the
Scottish Government received a significant increase of 10.6%.  The Scottish
Government budget increased in both cash and real terms from £36.7 billion
to £41.8 billion.  Despite this increase the Scottish Government has continued
to underfund West Dunbartonshire Council. 
The Scottish Government is also looking to reduce funding to local
government by a further 7% over the following 4 years.  This is extremely
worrying for our Council and our communities. 
Council also notes that disappointingly, SNP raided the Council’s reserves to
balance the books and left the Council with a forecast budget gap of £13.8
million for next year.  This is a disastrous situation for our communities as we
have a perfect storm of rising inflation, funding cuts and a massive debt left by
the SNP. 
Council agrees to note the report and its implications and asks the Chief
Executive to explore ways to reduce the impact of the SNP failure to properly
fund West Dunbartonshire Council and the SNP failure to effectively manage
the Council budget. 
As an amendment, Councillor Conaghan seconded by Councillor McColl moved:- 
That Council agrees to note the recommendations contained in the report 
On a roll call vote being taken 8 Members voted for the amendment, namely
Councillors Conaghan, Dickson, Docherty, McColl, McElhill, Pollock, Scanlan and
Traynor and 11 Members voted for the motion, namely Provost McAllister and
Councillors Edward, Johal, Lennie, McBride, McGinty, McKay, O’Neill, Rooney,
Sorrell and Steel.  Councillor Bollan abstained from voting.  The motion was declared
carried.
Page 15

Page 16

COMMITTEE TIMETABLE - AUGUST 2022 TO JUNE 2023
A report was submitted by the Chief Officer – Regulatory and Regeneration seeking
approval of a committee timetable for the period August 2022 to June 2023.
Councillor Rooney, seconded by Councillor McGinty moved:-
Council notes the recommendations in the report to adopt the timetable of
meetings at the appendix to the report (and shown as an appendix to these
Minutes); that Council and policy meetings will be held in hybrid format in the
Civic Space, Council Offices, Church Street, Dumbarton; regulatory
committees, namely Planning and Licensing, will alternate between the
Council Offices, Dumbarton and Clydebank Town Hall; Appeals Committee
meetings continue to be held in the Council Offices, Dumbarton; and the
remaining committees will be held in the Council Chamber, Clydebank Town
Hall. 
Furthermore, the Council agrees to schedule a Special Cultural Committee
meeting for Wednesday 29th June at 10:00 in Church Street, Dumbarton.  In
addition a timetable for committee meetings for the subsequent four years is
brought to a future Council meeting. 
Council also agrees that the Chair of the Cost of Living Working Group shall
organises appropriate meetings in order to progress the West Dunbartonshire
Cost Of Living Plan. 
Councillor Conaghan asked if Councillor Rooney would accept the following as an
addendum to his motion:-
That meetings of the Audit Committee alternate between Clydebank and
Dumbarton and that all meetings of the Dumbarton Trust Committee be held
in Dumbarton.
Councillor Rooney confirmed his acceptance and the motion with addendum was
then agreed by the Council.
Councillor Bollan, having failed to find a seconder for a proposed amendment,
requested that his dissent be recorded in respect of this item.
TOWARDS 2030
A report was submitted by the Chief Executive setting out the progress of the Council
over the last decade and highlighting the key challenges moving towards 2030.
The Council agreed to note the contents of the report.
Page 16

Page 17

VALEDICTORY
JOYCE WHITE, CHIEF EXECUTIVE
Provost McAllister advised that this was the last meeting of West Dunbartonshire
Council that Joyce White, Chief Executive, would be attending as she was leaving
Council service on 24 June.  On behalf of all Elected Members, staff, residents and
community organisations in West Dunbartonshire he thanked Mrs White for her
outstanding service over the last 14 years and wished her well for the future.
Councillor Rooney concurred with the Provost’s sentiments, acknowledging Mrs
White’s strong, strategic leadership through many challenges and that she had been
a fantastic Chief Executive for West Dunbartonshire who had promoted continuous
change.
Councillor McColl acknowledged Mrs White’s professionalism and how he valued the
support she had given him over her 14 years at West Dunbartonshire Council.  He
referred to her commitment to the area and how her strategic leadership had
contributed to the performance of the Council going from strength to strength.  He
wished her well for the future.
Councillor Conaghan referred to the many personal qualities that Mrs White had
used to network with external bodies and how these connections had benefitted the
Council.  Councillor Conaghan extended her good wishes to Mrs White for the future.
Councillor McBride referred to his close working with Mrs White over the last 14
years, her good nature and welcoming attitude, and that she had always been a
Chief Executive who was accessible to Elected Members and staff.  He wished her
well in her retirement.
In response, Mrs White thanked everyone for their kind words, stating it had been a
great privilege and honour to serve in West Dunbartonshire.
LEVELLING UP FUNDING TRANSPORT BID PROPOSAL
A report was submitted by the Chief Officer – Roads and Neighbourhood (Shared
Services) seeking approval to submit a bid to the UK Levelling Up Fund (LUF) by the
Round 2 deadline of 6 July 2022.
After discussion and having heard the Chief Officer in answer to Members’
questions, the Council agreed:-
(1) to approve the proposed bid submission comprising the Clydebank
Transportation Hub and the Carless Access Road (Scottish Marine
Technology Park);
(2) to note that should the Carless Access Road not be able to proceed further
due to the assessment of the state aid position the Kilbowie Roundabout
project would be developed for submission; and
Page 17

Page 18

(3) to authorise the commencement of the procurement processes relating to the
projects included in the bid. 
WEST BRIDGEND HALL – MOTION FROM COUNCIL 9 MARCH 2022 
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing an update on the progress of the West Bridgend Hall project and indicative
costs. 
Councillor McBride moved:- 
The Council notes the report and the significant increase in costs since the
new Community Centre was first proposed. 
This Council reaffirms its supports for the Westbridgend Community Group
who have worked hard to get the group constituted and to develop their
business plan. 
The Council is fully committed to ensuring that the group secure a suitable
Community Centre for their area. 
Council notes that the ten year capital plan already includes a new
Westbridgend Community Centre. 
The Council needs to demonstrate best value when committing public funds
therefore, prior to progressing with the new built option, council officers are to
explore whether the Church Hall which is up for sale and which has
accessible access old meet the organisation’s needs. This could mean the
facility could be available much quicker and at significantly lower cost than the
new build option. 
This Council requests that officers bring a further report in August with
suitable options, highlighting any issues to allow the council to make its an
informed decision so that we demonstrate best value and can progress with
securing a suitable Community facility. 
In the meantime we will link with CVS who will be helping the Group with
applications for funding - for example the Big Lottery Fund; or funds which
may assist with fit out costs. 
We will be attending the Group AGM on 23 June.  Our intention would be to
have regular meetings, ensuring the most appropriate people attend including
CVS and various council officers - regeneration, assets and communities
teams - to assist with the above. 
The motion was agreed by the Council. 
Page 18

Page 19

VIOLENCE AND HARASSMENT CONVENTION – MOTION FROM COUNCIL 
9 FEBRUARY 2022 
A report was submitted by the Chief Officer – People and Technology providing a
summary of the work being undertaken in support of the Violence and Harassment
Convention, and addressing the specific points raised in the motion submitted to
Council on 9 February 2022. 
Councillor Rooney moved that Council agree to note the update. 
Councillor Conaghan asked Councillor Rooney if he would accept the following as an
addendum to his motion:- 
Council recognises the real problems West Dunbartonshire has with domestic
violence and therefore commits to no reduction in funding to Women's Aid and
Rape Crisis for the whole of this Council term. 
Councillor Rooney confirmed his acceptance, and the motion with addendum was
agreed by the Council. 
ADJOURNMENT 
The Provost adjourned the meeting for a short recess.  The meeting reconvened at
12.08 p.m. with all those listed in the sederunt present. 
EMERGENCY ITEM OF BUSINESS
COUNCILLOR McGINTY - COST OF LIVING CRISIS 
Councillor McGinty moved:- 
This Council notes the cost of living increased markedly over the past year
driven by the increase in the wholesale cost of oil and gas; the increase in
demand following the public health emergency, market failure in the energy
market and the impact of Brexit. 
Council also notes that the UK Government and Scottish Government took
measures to address the impact of the cost of living crisis, but there is still
more to be done. 
West Dunbartonshire Council had already agreed to set up a cross-party cost
of living working group to help local residents to cope with the impact of rising
prices. 
In order to fund local initiatives the council agrees to use available COVID
funds to release £600,000 to add to the £400,000 set aside at the budget in
March, creating a Cost of Living fund of £1m. 
Page 19

Page 20

In addition, the Council also agrees to earmark a further £1m of capital to
support council and community organisations with capital costs for cost of
living initiatives. 
A process will be developed to review applications for funding to be submitted
through the Cost of Living Working Group for consideration and then passed
to an appropriate committee or council for approval.
Given the urgency of getting some initiatives in place in advance of the
summer the Council agrees the following projects are funded from the cost of
living fund.
• £52,000 funding to provide a foodbank supplement of £1,000 per week
shared between West Dunbartonshire foodbanks
• £25,000 to Antonine Sports Centre to support sports and leisure
programme for local residents over the rest of the financial year.
• £22,000 free summer swim for school pupils initiative helping families with
additional costs.
• £12,500 for free all-inclusive family memberships from July to August for
families identified by Working4U.
• £8,350 to support the Recycling Room with rental costs for the next 12
months while they develop a bid to the lottery or other funders.
• £5,000 for free gym membership over the summer for 14 year to 18 year in
WDLT fitness suites.
• In addition there are a number of school based activities funded from within
existing education services resources.
As well as the above, the Council agrees to:
• Set up a an energy Household Energy Support Fund using £250,000 and
• To provide up to £50,000 for targeted community bulk uplifts, grass cutting
and litter picking to clean up our estates where families do not have the
funds to pay for these items.
Council officers are requested to work with Faifley Food Share to help them
submit a bid through the Cost of Living Working Group for capital funding for a
replacement van; and to support Awestruck Academy to submit bids to the Cost
of Living working Group to help develop the services they provide to the local
community. 
The Council notes that the cost of living package includes the £750,000 clothing
grant which was agreed in March. 
The Governance arrangements mean that a planned HSCP package which
includes a range of proposals to be considered by the Health & Social Care
Partnership are set out below:
• 4 x welfare rights staff to support an income maximisation campaign
£150,000
• Children's services staff x 4 £120,000
Page 20

Page 21

•  Participatory budget £300,000
•  Kinship carers and Foster carers £120,000
•  Carers support £850,000 
The above have been discussed with the Chief Officer but it is for the Integrated
Joint Board to approve these earmarked funds- to support the west
Dunbartonshire Cost of Living Plan. 
In addition to the above the Labour Administration plan to abolish the £1.5m of
non-residential care charges at the August HSCP. The aim is that the HSCP
covers the loss of income from HSCP un-earmarked reserves. 
The Council agreed the motion. 
EMERGENCY ITEM OF BUSINESS
COUNCILLOR BOLLAN - RENT ABATEMENT, SMALL BUSINESSES,
ALEXANDRIA 
Councillor Bollan, seconded by Councillor Dickson moved:- 
Council agrees to 100% rent abatement for the small, family businesses in
Main Street, Alexandria affected by the Masterplan works currently underway
for the remainder of the contract. 
As an amendment, Councillor McGinty seconded by Councillor Rooney moved:- 
This Council notes that many of the small businesses in Alexandria have been
adversely affected by the ongoing works taking place at Smollett Fountain and
need support.  We also acknowledge that they have struggled to survive the
effects of the pandemic and are now facing a cost of living crisis.  The normal
approach is that businesses need to provide proof of loss and the Council
must be aware of how much any action would cost. 
Given the urgency of the situation this Council instructs officers to meet with
the businesses over the next week and to come to a quickly arranged Cost of
Living Group meeting to put forward any proposals that will give them the
appropriate support that they need and this will be delegated to the Assets
Co-ordinator to implement following the recommendations from the Working
Group.  This will have to include measures such as rent relief and ensuring
that the shops are shown to be open for business and any other measures
that could help increase the footfall of these shops. 
ADJOURNMENT 
The Provost agreed to adjourn the meeting for a short period to allow the motion and
amendment to be considered by officers. 
The meeting reconvened at 1.29 p.m. with all those listed in the sederunt present.
Page 21

Page 22

The Legal Officer provided clarification on the Scheme of Delegation, and in view of
this and with the agreement of the mover, seconder and majority of those present
Councillor McGinty withdrew her amendment and moved an amended version as
follows, which was seconded by Councillor Rooney:- 
This Council recognises that many small businesses in Alexandria have been
adversely affected by the ongoing works taking place at the Smollett Fountain
and require support.  We also acknowledge that they have struggled to
survive the effects of the COVID pandemic and are now facing a cost of living
crisis.  The normal approach is that businesses need to provide proof of loss
and the Council must be aware of how much that action would cost and how it
will be funded. 
Given the urgency of this matter, this Council instructs officers to start meeting
with the businesses today to discuss any proposals to give them the
appropriate support they need.  This will include measures such as rent
abatements from today for the small locally owned businesses and any other
measures to show that these shops remain open for business and help them
to increase their footfall. 
On a roll call vote being taken 11 Members voted for the amendment, namely
Provost McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty,
McKay, O’Neill, Rooney, Sorrell and Steel and 9 voted for the motion, namely
Councillors Bollan, Conaghan, Dickson, Docherty, McColl, McElhill, Pollock, Scanlan
and Traynor.  The amendment was declared carried. 
NOTICE OF MOTIONS 
(a) Motion by Councillor Gordon Scanlan – West Dunbartonshire Leisure
Trust 
Councillor Scanlan, seconded by Councillor Pollock moved:- 
Council recognises the outstanding contribution of all staff and volunteers
from all arms of West Dunbartonshire Leisure including Sport Development
and active schools, many of whom have been dedicated to the delivery of
sport, physical activity and physical literacy for decades. Council appreciates
the lifelong benefits of this to residents of all ages within our community and
especially so for their contribution in areas of high deprivation, to children and
to those with additional support needs. 
Council finds the current restructure proposal which would result in staff
losses unacceptable, especially given the rise in the management budget for
leisure services. 
Council calls on the Leisure Trust to scrap the current restructure proposal. 
Council is conscious that the staff affected have now faced 2 such restructure
proposals in the space of 18 months, and understand that the handling of this
Page 22

Page 23

latest restructure idea has caused distress, and negatively impacted trust and
goodwill in senior management.
Council recommends that the Leisure Trust implement a moratorium on any
organisational restructure which would result in job losses for the next 3 years
giving the staff much needed security and the breathing space to continue
their great work. Such an act would go a long way to help repair strained
workplace relations.
As an amendment, Councillor Rooney seconded by Councillor Edward moved:-
That the Council notes the motion and takes no action at this time when
consultation is ongoing.
On a roll call vote being taken 11 Members voted for the amendment, namely
Provost McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty,
McKay, O’Neill, Rooney, Sorrell and Steel and 9 voted for the motion, namely
Councillors Bollan, Conaghan, Dickson, Docherty, McColl, McElhill, Pollock, Scanlan
and Traynor.  The amendment was declared carried.
(b) Motion by Councillor Jim Bollan – Warmth Centres
Councillor Bollan, seconded by Councillor Dickson moved:-
Council agrees that no Citizen should need to choose between heating or
eating.  Accordingly the Council agrees to explore the option of setting up , in
advance of the winter, at least three "warmth centres" across West
Dunbartonshire for people to attend through the day and evenings to ensure
no Citizen needs to choose between heating or eating with a report being
brought back to the next Council meeting providing options and costs. The
warmth centres could be located in church halls with the Council paying
heating costs or in community centres which are already staffed.  The report
can detail options.  The report can also outline how any costs can be paid for,
however a request should be made that reserves held by the HSCP be used
for this purpose. 
Further, the Council also agrees to state publicly, via the Council Leader, that
WDC will not agree to any forced energy disconnections of domestic premises
and will assist/advise any citizen facing a disconnection by any energy
supplier.
As an amendment, Councillor McGinty seconded by Councillor Rooney moved:-
This Council welcomes Jim’s proposals for Warmth Centres but we believe
this should be discussed by the Working Group, which will then bring forward
proposals to either Council or the appropriate committee.
On a roll call vote being taken 11 Members voted for the amendment, namely
Provost McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty,
Page 23

Page 24

McKay, O’Neill, Rooney, Sorrell and Steel and 9 voted for the motion, namely
Councillors Bollan, Conaghan, Dickson, Docherty, McColl, McElhill, Pollock, Scanlan
and Traynor.  The amendment was declared carried.
(c) Motion by Councillor Karen Conaghan – Democracy and Political
Balance
The Provost advised that the Council required to suspend Standing Order 20(a) to
allow consideration of this item of business.
On a vote being taken, 9 Members voted for the suspension of the Standing Order
and 11 against.  As two thirds of those present and voting were not in favour of the
suspension, the item of business was not considered.
(d) Motion by Councillor Daniel Lennie – Vandalism at Our Lady of Loretto
Primary School
Councillor Lennie moved:-
This Council is deeply disappointed to learn about yet another incident of
vandalism at Our Lady of Loretto Primary School in Dalmuir. 
It is noted that according to Police Scotland this is the latest of a series of
instances of vandalism at the school over recent months.
This Council is concerned about the security of the outdoor spaces at the
school and calls on the Council to consider measures to make the school
outdoor spaces more secure. 
Council also agrees that the damaged facilities and equipment should be
repaired and replaced as a matter of priority to ensure children can continue
to use outdoor play facilities when they return after the summer holidays. 
The costs of the repair works and any improvements to security are to funded
from existing council capital and revenue resources within Education.
The proposed improvements shall include the following:
• A new Multi-Use Games Area as already agreed £250,000
• Upgrade to CCTV £21, 485
• New fencing and gates £63,658
The Council agreed the motion.
Page 24

Page 25

(e) Motion by Depute Provost John Millar – Armed Forces Covenant
In Depute Provost Millar’s absence Councillor Rooney moved:-
West Dunbartonshire Council renews its commitment to the Armed Forces
Covenant, which is based on the premise that those who serve or have
served, and their families deserve respect, support and fair treatment. In
particular, it states that: 
“Those who serve in the Armed Forces, whether regular or Reserve, those
who have served in the past, and their families, should face no disadvantage
compared to other citizens in the provision of public and commercial services.
Special consideration is appropriate in some cases, especially for those who
have given most such as the injured and the bereaved.”
West Dunbartonshire Council is proud to be Armed Forces friendly and
recognises the enormous contribution and sacrifices that members of the
Armed Forces and their families make every day for the safety and security of
our country.
West Dunbartonshire values the service of all British Armed Forces
personnel, past and present, including those from Commonwealth Nations.
This Council requests the production of a report examining what more West
Dunbartonshire Council can do to support our serving and veteran community
across the full range of services we provide and strengthen partnerships with
the Armed Forces Community.
The Council agreed the motion.
The meeting closed at 2.27 p.m.
Page 25

Page 26

Page 26

Page 27

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Executive 
Council: 31 August 2022
Subject: Glasgow City Region City Deal - Update
1. Purpose
1.1 To note the progress with the implementation of the Glasgow City Region,
City Deal and seek approval to accelerate the drawdown of increased
design costs required for the delivery of the Full Business Case for the
Council’s Exxon Infrastructure Project.
2. Recommendations
2.1 It is recommended that Council:
i) notes the progress of the Glasgow City Region programme;
ii) notes progress on the Council’s City Deal project for the Exxon site and
approves submission of a Project Change Request to the City Region
Project Management Office for accelerated drawdown of £2.99M (subject
to minor price revisions) required to deliver the Full Business Case;
iii)agrees  to meet  the accelerated  drawdown from the agreed capital
budget contribution of £9.64M should the Project Change Request be
refused by the Project Management Office
iv) notes the revised target date for the submission of the Full Business Case
of June 2023
3. Background
3.1 The Glasgow City Region City Deal Infrastructure programme equates to
£1.13bn of investment during period 2015-2035. Projects are progressing
and have reached various stages from Strategic, Outline and Full Business
Case stages of approval.
3.2 Previous reports, listed in background papers, have identified progress of the
Council’s City Deal project at the Exxon site.
4. Main Issues
4.1 The Council is progressing the Exxon Project, which includes working with
Balfour Beatty via the Scape Framework as part of the pre-construction
agreement to allow the detailed design elements of the project to
commence and provide greater certainty regarding the budget position. It
Item 7
Page 27

Page 28

was reported to June Council that the cost of producing the Full Business
Case, which will be delayed until June 2023, had increased and it is
proposed that further funding be drawn down to meet the increased cost.
The figure reported to June Council has been superseded by a more
recent updated cost provided by the contractor. 
Glasgow City Region City Deal Update
4.2 The Glasgow City Region (GCR) Chief Executives’ Group met on 9 June
2022 and a GCR Cabinet meeting was held a week later. Agenda items
included a presentation of Green Freeports bid and Shared Prosperity Fund,
both addressed elsewhere on this report. The agendas for both meetings
also included the launch of the Clyde Peatlands project and the Home
Energy Retrofit project.
4.3 The most recent Chief Executive’s Group meeting was held on 11 August.
Items discussed included an update on Shared Prosperity Fund, a regional
approach to Electric Vehicle charging infrastructure, creation of a new Clyde
Climate Forest, and a proposal to establish an Anchor Network for
Community Wealth Building. An evaluation of North Lanarkshire Council’s
Outline Business Case for A8/M8 Corridor Access improvements was
submitted for consideration.
West Dunbartonshire Council City Deal Project
4.4 The pre-construction agreement with Balfour Beatty, who were appointed to
deliver the design and build contract for the Exxon Infrastructure project, is
progressing to the next stage and the agreement for the detailed design start
is imminent. In late July 2022 Balfour Beatty provided an updated feasibility
offer including design costs to the Council, which have been reviewed by the
Exxon Project Board.
4.5 The Exxon Project Board recommends to Council to progress with a design
cost that includes the transport infrastructure elements (eastern and western
junction improvements to A82, new eastern overbridge and spine road and
related flood mitigation measures), the commercial platform developments,
basic utility services under the spine road service corridor, riverside pathway, 
wider core path and landscape elements to  help address  the terms of the
conditions attached to the planning permission in principle and the approved
masterplan.  The transport infrastructure and platform design has a firmed up
cost, however the contractor is currently only able to provide high level
design cost for the utility, core path and landscape elements. Consequently
the overall design cost stated below might have to be revised. The contract
for the design package requires to be agreed as soon as possible, as it
impacts on the timescales for securing planning permission and possession
Network Rail line for the Western Underpass construction that will have
consequences for the overall programme
4.6 Notwithstanding minor revisions explained above, the estimated cost to reach
Final Business Case (FBC) is now £6.44m, compared to the previously
agreed FBC delivery cost of £3.45M.  The required additional accelerated
Page 28

Page 29

funds to carry out the design is therefore £2.99m. The Council will progress a
Project Change Request to City Deal Project Management Office (PMO) to
draw down the additional funding. If the PMO do not approve the request it is
proposed that the balance is taken from the approved WDC contribution to
the City Deal project, approved by Council on 22 February 2017 and at the
City Region Cabinet on 11 April 2017, and subsequently approved as a
refreshed Outline Business Case at Council on 28 November 2018.
The design package will provide certainty on total construction costs and
allow the Council to prioritise and take decisions on what can be constructed
in the future. 
4.7 It is not anticipated that City Deal will approve additional funding for the
components of the design package that relate to landscape and core path
development as these are outwith the original scope of the Outline Business
Case. Therefore these capital costs will need to be funded by the Council.
Landscaping and path development are planning conditions that the Council
is required to fulfil and we are currently exploring additional funding sources
to meet the construction costs of these components. Having a developed
design will demonstrate a greater degree of deliverability to potential funders.
4.8 The delays in completing the Final Business Case are related to covid
impacting on remediation timescales and a change in design scope to
include increased flood mitigation measures. The Final Business Case will be
brought before Council for consideration, prior to submitting it to City Deal.
4.9 A separate report on securing land from 3rd party land owners is brought
to Council for consideration.
Green Freeport Bid
4.10 Scotland’s Green Freeports are free economic zones (FEZ) that include rail,
sea or air. Organisations within the Green Freeport zone can benefit from tax
breaks and lower business tariffs, forming part of the UK Government’s
Levelling Up agenda and the Scottish Government’s Economic Strategy
2022. The joint government objectives for Green Freeports in Scotland are:
• To promote regeneration and high-quality job creation
• To promote decarbonisation and a just transition to a net zero economy
• To establish hubs for global trade and investment
• To foster an innovative environment.
4.11 The Glasgow City region bid is a partnership between the public sector (the 8
Local Authorities in the City Region) and the private sector. It is a trimodal bid
involving sea freight at Greenock Ocean Terminal, Glasgow Airport and
Mossend rail terminal.  The land included in the bid includes sites in
Inverclyde, Renfrewshire, Glasgow, North Lanarkshire and West
Dunbartonshire.  In West Dunbartonshire the sites included in the bid are
adjacent to Bowling Basin and Rothesay Dock in Clydebank, both owned by
Peel Ports. 
4.12    Five bid applications from regions across Scotland were submitted to the UK
and Scottish Governments for review on 20 June 2022, from which two
Page 29

Page 30

successful Regional Bids will be selected with each asked to develop a more
detailed business case. The outcome of the bidding process is expected to
be announced by late summer, currently anticipated to be 31 August. In
addition to the Clyde Green Freeport bid, 4 other bids have been submitted:
• Aberdeen City and Peterhead Green Freeport
• Opportunity Inverness and Cromarty Firth
• Firth of Forth Green Freeport
• Orkney Green Freeport
Shared Prosperity Fund
4.13 A report will be presented to the Housing and Communities Committee on
22 August to note the Council's proposed approach to the development of
Glasgow City Region Investment Plan for Shared Prosperity Fund.
4.14    The UK Shared Prosperity Fund (UKSPF) is the UK Government’s main
funding to replace European Union Structural Funds. The concept of the
UKSPF was first outlined in 2017, but very little substantive information was
made available until some ‘pre-launch guidance’ was published in February
2022. This was followed up by the publication of a full prospectus in April
2022 by the UK Government.
4.15 The prospectus for the fund outlines the overarching aims of building pride in
place and increasing life chances. The three year fund has three core
investment priorities that will guide the development of activities and how the
funds should be allocated. These are Communities and Place; Supporting
Local Business; and People and Skills. Lead authorities such as West
Dunbartonshire Council are strongly encouraged to collaborate with their
neighbouring authorities to develop regional investment plans. The Council
is working in partnership with Glasgow City Region partners. A Glasgow City
Region Head of Shared Prosperity Fund has been appointed and a working
group of the UKSPF Officer leads in each local authority has been
established and now meets on a regular basis to take the Regional
Investment Plan forward.
4.16 West Dunbartonshire share has been allocated by the UK Government in
proportion to the population and level of need. West Dunbartonshire has
been awarded a notional allocation up to £3,895,815. The Council’s
approach has been to develop interventions in all three investment priority
areas. A sequential approach has been established to identify the
appropriate mix of priorities that are consistent with the outputs and
outcomes set out by the UKSPF guidelines. This approach prioritises and
builds on existing commitments. This includes:
• Reviewing existing activity where continuity beyond European
Structural fund end dates is an issue and identify what can be
supported through UKSPF. For example the current employability
service is delivered with European Structural Funds that end in June
2023;
Page 30

Page 31

• Review existing plan priorities and consulting with stakeholders and
partners to identify eligible activity from those plan priorities that could
be delivered within the budget constraints.
• Proposed expenditure by heading is shown on the table below:
Priority £Total % of core Activity (Outcome indicator number)
Community and
Place
944,222 30% • Shopfront and Small Business
Improvement Grants (S1);
• Pride in Place – Supporting
Community Gardens  4 sites (S3);
• Improvement and upgrade of CCTV
Infrastructure (S4)
• Community Pantry Network (S9),
Community Consultation (S9),
Community based communication
(S9).
Business 500,000 16% Grant based initiatives for:
• Enhancing West Dunbartonshire’s
Tourism Events & Attractions (S14);
• Business Recovery & Growth (S15);
• Towards Net Zero (S15);
• Expert Help for Businesses (S20);
• Early Stage Growth (S25);
People and Skills 1,728,824 54% • Employment support for economically
inactive people (S31);
• Employability programmes & advice -
No One Left Behind agenda (S35);
• Competitive grant fund for specialist
employability support and local skills
needs (S36);
• Case managed support for young
people (S39);
• Programme management and admin.
Multiply 672,771 Ring
fenced by
UKSPF
Guidelines
• Courses designed to increase
confidence with numbers (S42);
• Courses aimed at encouraging
people to upskill to access
jobs/careers (S45);
• Additional relevant maths modules in
vocational courses (S46);
• Innovative programmes delivered
with employers (S47);
• Intensive& flexible courses targeted
at those without Level 5 maths (S48);
• Courses designed to help people use
numeracy to manage money (S49);
• Provision developed in partnership
with community organisations (S51).
Page 31

Page 32

Clyde Bridge
4.17 The City Deal funded Clyde Waterfront and Renfrew Riverside Project
consists of a new “opening bridge” in the location of Meadowside Street,
Renfrew linked to a new road network which links to Dock Street in the north
and the new Renfrew North Development Road, to the south. The Renfrew
North Development Road will run between Meadowside Street, and Argyll
Avenue Renfrew to link with Inchinnan Road.
4.18 The Contractor maintains a website with regular updates on the project. This
can be accessed at: www.graham.co.uk/clyde-waterfront
4.19 Since the last report the Contractor has continued to develop the detailed
designs for the project, based on the consented specimen design and
continued dialogue with key stakeholders and landowners. Previously agreed
accommodation works and boundary fencing is also being undertaken for
landowners within the project area. 
4.20 To maximise the opportunities for local businesses, all sub-contracts over
£10,000 are being advertised on the Public Contract Scotland website.
Currently the following notices are posted:
• Clyde Waterfront and Renfrew Riverside (CWRR) New Clyde Bridge
Provision of Deep Soil Mixing Works
• CWRR New Clyde Bridge Provision of Band Drain & CMC Works
• CWRR Provision of Earthworks Package
4.21 Next stages of works include submission of design drawings to West
Dunbartonshire Council officers for the road and drainage designs within the
West Dunbartonshire area and discussions with Planning Officers regarding
detailed design elements of the bridge. 
4.22 Newsletters are accessible by those who register for further updates after the
issue of the first newsletter to over 3,500 residents and businesses in the
local area. Posters advising the project website address were also delivered
to public buildings in the project area. A link to register for updates is
contained within the project webpage noted above.
5 People Implications
5.1 There are a number of senior officers involved in the Glasgow City
Region wider programme as identified at City Region Update paper at
Council on 26 August 2021.
6. Financial Implications
6.1 The expenditure for the City Deal project during 2021/22 was £444,415 as
at end of May 2022 the current expenditure for 2022/23 stands at
£79,614.  The total project Capital budget expenditure is currently
£2.760m.
Page 32

Page 33

6.2 The approved budget to date for the City Deal Exxon project is £3.45m,
however costs for development and delivery of the Full Business Case have
increased to £6.44m, therefore it is proposed that the additional cost is
drawn down from City Deal allocation as described above. The overall
Council approved project budget is £34.05m. This is continually monitored
and changes to this following the progression of a detailed design package
will be reported to Council.
7. Risk Analysis
7.1 There are a number of project risks associated with the development at
the ExxonMobil project site and these are contained within the risk
register of the refreshed Outline Business Case and updated by the
project board on a regular basis.
8. Equalities Impact Assessment
8.1 An Equalities Impact Assessment is not necessary for this report.
9. Consultation
9.1 Consultation with all key stakeholders is progressing as we continue
to work as part of the Glasgow City Region.
9.2 Legal Services, Finance and Procurement are regularly consulted
through their participation in the Exxon project board.
9.3 Wider communication is produced regarding progress of the Glasgow
City Region at its website http://www.glasgowcityregion.co.uk/
10 Strategic Assessment
10.1 At its meeting on 25 October 2017, the Council agreed that one of its
main strategic priorities for 2017 - 2022 is:
• A Strong local economy and improved employment opportunities
10.2 The proposals within this report are specifically designed to deliver on
this priority.
Peter Hessett
Chief Executive
Date: 17 August 2022
Person to Contact: Gillian McNamara
gillian.mcnamara@west-dunbarton.gov.uk
Appendix: None
Page 33

Page 34

Background Papers: UK Shared Prosperity Fund Report to Housing and
Communities Committee 22 August 2022
GCR Interim Performance Report- 18 Nov 2021 , GCR
Education Improvement Collaborative/West Partnership
Improvement Plan 2021/22, Glasgow City Region City
Deal – 29 Council updates since February 2016, March
2021 Elected Members briefing- Renfrew Bridge, July
2020 Members Bulletin.
ExxonMobil Commercial Agreement 24 June 2020.
Glasgow City Region City Deal - Exxon Site Outline
Business Cases 22 Feb 2017 and 28 Nov 2018
(Refreshed). 
Clyde Valley City Deal - Update and Strategic Business
Case- Council 24 June 2015. 
Clyde Valley City Deal Update- Council 25 Aug 2015 and
16 Dec 2015. 
Clyde Valley City Deal- Governance- Council 17 Dec
2014.  
Glasgow City Region City Deal- Council 13 August 2014.
“City Deal Initiative” Clyde Valley Investment Fund-
Council 30 April 2014 (Memorandum of Understanding).
Clyde Valley Community Planning Partnership – City Deal
Initiative – Council 28 August 2013.
Equalities Impact Assessment November 2018.
Environmental Impact Assessment -DC20/088 – Planning
Application – Documents.
Wards Affected: All
Page 34

Page 35

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer: Supply, Distribution and Property
Council: 31 August 2022
Subject: Exxon Land Acquisitions
1. Purpose
1.1 To note the progress made in negotiations with landowners and seek
approval for acquisitions as detailed in the report.
2. Recommendations
2.1       It is recommended that the Committee:
(i) Approve recommendations contained in 4.8, 4.13; 4.16; 4.18, 4.22,
4.25 and 4.27.
(ii) Authorise the Chief Officer, Supply, Property and Distribution to
conclude negotiations.
(iii) Authorise the Chief Officer, Regulatory and Regeneration to conclude
the transaction on such conditions as considered appropriate.
3. Background
3.1 Previous reports, listed in background papers on Report to Council 31
August 2022: Glasgow City Region City Deal - Update have identified
progress of the Council’s project at the Exxon site.
3.2 The Exxon site development project will entail delivery of road access and
the supporting infrastructure required to enable development of the site.
3.3 One of the fundamental infrastructure requirements is the construction of
road network accesses at the eastern and western extents of the site linked
by a spine road through the site, which will enable it to be accessed for
development.
3.4 The site requires substantial investment in site preparation prior to
development taking place including decontamination works prior to transfer
to West Dunbartonshire Council, creation of new roads infrastructure, flood,
environmental and drainage mitigation.
4. Main Issues
4.1 Extensive discussions have taken place with a number of landowners in
respect of acquisitions of land to facilitate the redevelopment of the former
Item 8
Page 35

Page 36

oil terminal.
4.2 West Dunbartonshire Council engaged District Valuer as agents to appraise
each site, provide valuations and thereafter negotiation with landowners on
agreed acquisition prices and other reasonable provisions to accommodate
concerns of the landowners and other reasonable provisions to
accommodate concerns of the landowners.
4.3 A plan detailing the various land acquisition sites can be found at
Appendices 1 (a) and 1 (b).
4.4 Past  Reports to Council have narrated the benefits of the project to the
West Dunbartonshire Community in terms of the improvement to transport
and the GVA which will arise from the project and the necessity to acquire
land in order to deliver the project. These reports are listed as background
papers to this report. 
4.5 It is the viewpoint of officers that they have done all that is reasonable over
a number of years to acquire the required land on a voluntary basis. 
4.6 Whilst the Council has been clear that it would pursue all avenues to
acquire on a voluntary basis, and that remains the fastest and most
favoured route, the option of compulsory acquisition remained on the table.
The project is now at a point that if compulsory purchase is required, a delay
in proceeding by that route represents a risk to the project.
Arnold Clark Automobiles Limited
4.7 Negotiations have taken place in respect of a voluntary arrangement with
Arnold Clark Automobiles Limited in respect of the area required for the
Exxon site development project at a value of Twenty Thousand Pounds
(£20,000) Sterling.
4.8 It is recommended that members agree to purchase of the area of ground
detailed in Appendix 2 from Arnold Clark Automobiles Limited for the sum
of Twenty Thousand Pounds (£20,000) Sterling.
4.9 During negotiations for the purchase of the land as part of the Exxon site 
development project we were approached by Arnold Clark Automobiles
Limited to purchase the area of ground  (Appendix 3) which they currently
lease from West Dunbartonshire Council for £20,000 per annum.
4.10 This area of ground is not required by West Dunbartonshire Council for any
operational requirement.
4.11 The disposal of the site to Arnold Clark Automobiles Limited will retain a
local business within West Dunbartonshire.
4.12 A valuation was instructed via the District Valuer who has subsequently
provided a valuation of Three Hundred and Sixty Five Thousand Pounds
(£365,000) Sterling.
Page 36

Page 37

4.13 It is recommended that members agree to dispose of the area of ground
detailed in Appendix 3 to Arnold Clark Automobiles Limited for the sum of
Three Hundred and Sixty Five Thousand Pounds (£365,000) Sterling.
4.14 This disposal will have no suspensive conditions and be able to conclude
within 4 weeks of any approval given by Council.
Charles Cleary
4.15 Negotiations have taken place in respect of a voluntary arrangement with
Charles Cleary in respect of the area require for the Exxon site
development project at a value of Sixty Five Thousand Pounds (£65,000)
Sterling.
4.16 It is recommended that members agree to purchase of the area of ground
detailed in Appendix 4 from Charles Cleary at a value of Sixty Five
Thousand Pounds (£65,000) Sterling.
Chivas Brothers Limited
4.17 Negotiations have taken place in respect of a voluntary arrangement with
Chivas Brothers Limited  in respect of the area require for the Exxon site
development project at a value of Twenty Thousand Pounds (£20,000)
Sterling.
4.18 It is recommended that members agree to purchase of the area of ground
detailed in Appendix 5 Chivas Brothers Limited at a value of Twenty
Thousand Pounds (£20,000) Sterling together with reasonable
accommodation works in respect of safety fencing for the area of land
being retained by Chivas Brothers Limited. 
Susan Jane Dick
4.19 Negotiations have taken place in respect of a voluntary arrangement with
Susan Jane Dick.
4.20 Susan Jane Dick has presented the Council with conditions regarding the
rehoming of her ponies on a temporary and permanent basis and on
assessment  officers are able to offer the following which it believes best
addresses the conditions:
o Purchase from Susan Jane Dick the area of ground detailed in
Appendix 6  at a value of Seventy Thousand Four Hundred Pounds
(£77,400) Sterling;
o Transfer of an area of ground up to 4 acres at the site currently
known as Sheepfold, on reinstatement after works, subject to Esso
Petroleum Company Limited’s approval and subject to ongoing
obligations as to use of land.  This will be at a value agreed per acre
as at today’s date to ensure no detriment to Susan Jane Dick when
purchasing at a later date.
o Granting of a grazing let at a site at Overtoun for a nominal sum of
£1 for a term to be defined.
o Transfer at nil value an area of ground near Littlemill for reburial of
Page 37

Page 38

horses.
4.21 In addition to the above terms the Council will agree to either carrying out
a new site investigation report for the area known as Sheepfold or
augmenting the report already received to include testing of not just the
soil, but also the vegetation and the water on site at the request of Susan
Jane Dick.
4.22 It is recommended that members agree subject to a voluntary agreement
with Susan Jane Dick the terms detailed in 4.20.  
Scottish Society for Prevention of Cruelty to Animals (SSPCA)
4.23 Negotiations have taken place in respect of a voluntary arrangement with
SSPCA in respect of the area require for the Exxon site development
project at a value of Eighteen Thousand Pounds (£18,000) Sterling.
4.24 Negotiations are ongoing in relation to area of ground to reduce the size of
the acquisition but these are not yet concluded at the time of writing the
report. 
4.25 It is recommended that members agree to purchase the area of ground or
part of the area of ground detailed in Appendix 7 to SSPCA following
conclusion of negotiations with the landowner at a value to be agreed with
the District Valuer.   
All Sites
4.26 All reasonable fees in respect of legal and land agents incurred as a result
of any of the transaction will be required to be paid by West Dunbartonshire
Council.
4.27 While all reasonable efforts have been made to enter into the above
voluntary arrangements, officers believe that the terms proposed represent
the most the Council can reasonably offer.  As timescales for the
commencement of construction are extremely tight, should acquisition not
be secured on binding terms within a very short period the project would
face considerable risk both in terms of price inflation and possession of the
railway to allow the works on the underbridge to commence.  Accordingly,
approval,  is sought to acquire any or all of the sites by Compulsory
Purchase Order under Part I of the First Schedule to the Acquisition of Land
(Authorisation Procedure) (Scotland) Act 1947  and either the Town &
Country Planning (Scotland) Act 1997 or the Roads (Scotland) Act 1984
should there be any delay in acquisition.  Delegated authority is sought for
the Manger of Legal Services to determine the appropriate approach and
formulate  any CPO for submission to Scottish Ministers for their approval
to the Council’s subsequent legal acquisition of the land.
5. People Implications
5.1 There are no people implications with this report.
6. Financial Implications
Page 38

Page 39

6.1 As detailed in 4.26 all reasonable fees in respect of legal and land agents
incurred as a result of any of the transaction will be paid by West
Dunbartonshire Council but the value of these fees will not be known until
transactions have completed.
6.2 As detailed in 4.22 and 4.25 and contained in recommendations 4.8, 4.16
and 4.18 cost in the region of £200,400 will be incurred subject to further
clarification.  This indicative budget cost is already accounted for in the
wider the Exxon site development project and no additional funds are being
sought in respect of this report.
6.3 By agreeing to the recommendation contained within 4.13, the Council will
benefit from a sizeable capital receipt of Three Hundred and Sixty Five
Thousand Pounds (£365,000) Sterling. 
6.4    There are no procurement implications arising from this report.
7. Risk Analysis
7.1 There are a number of project risks associated with the acquisition of land
and the impact on the wider Exxon project and these are monitored
regularly by the project board and any issues highlighted in the regular City
Deal updates to Council.
7.2 There is a risk that if the voluntary acquisition is delayed the project may
face delays and costs which may put the viability of the project in doubt.
This risk is mitigated by the request that compulsory purchase powers can
be delayed in the event of delay.
8. Equalities Impact Assessment
8.1 An Equalities Impact Assessment is not required for this report.
9. Strategic Environmental Assessment (SEA)
9.1 A Strategic Environmental Assessment is not required for the purposes of
this report
10. Consultation
10.1 Consultation was undertaken with landowners, external stakeholders and
various officers across a number of services including Resources and
Regulatory.
11. Strategic Assessment
11.1 The acquisition of the land contained within this report as part of the
wider Exxon project will contribute to the Council’s strategic priority for a
strong local economy and improved job opportunities
Page 39

Page 40

Angela Wilson 
Chief Officer, Supply, Distribution and Property
Date: 17 August 2022
Person to Contact: Michelle Lynn, Assets Co-ordinator
Email: michelle.lynn@west-dunbarton.gov.uk 
Appendix: Appendix 1(a) – Land Acquisition Plan
Appendix 1(b) – Land Acquisition Plan
Appendix 2 – Land Acquisition Plan (Arnold Clark
Automobiles Limited) 
Appendix 3 – Land Disposal Plan (Arnold Clark Automobiles
Limited)
Appendix 4 – Land Disposal Plan (Arnold Clark Automobiles
Limited)
Appendix 5 – Land Disposal Plan (Chivas Brothers Limited)
Appendix 6 – Land Disposal Plan (Susan Jane Dick)
Appendix 7 – Land Disposal Plan (SSPCA)
Background Papers:    UK Shared Prosperity Fund Report to Housing and
Communities Committee 22 August 2022
GCR Interim Performance Report- 18 Nov 2021 , GCR
Education Improvement Collaborative/West Partnership
Improvement Plan 2021/22, Glasgow City Region City
Deal – 29 Council updates since February 2016, March
2021 Elected Members briefing- Renfrew Bridge, July
2020 Members Bulletin.
ExxonMobil Commercial Agreement 24 June 2020.
Glasgow City Region City Deal - Exxon Site Outline
Business Cases 22 Feb 2017 and 28 Nov 2018
(Refreshed). 
Clyde Valley City Deal - Update and Strategic Business
Case- Council 24 June 2015. 
Clyde Valley City Deal Update- Council 25 Aug 2015 and
16 Dec 2015. 
Clyde Valley City Deal- Governance- Council 17 Dec
2014.  
Glasgow City Region City Deal- Council 13 August 2014.
“City Deal Initiative” Clyde Valley Investment Fund-
Council 30 April 2014 (Memorandum of Understanding).
Clyde Valley Community Planning Partnership – City Deal
Initiative – Council 28 August 2013.
Equalities Impact Assessment November 2018.
Environmental Impact Assessment -DC20/088 – Planning
Application – Documents.
Wards Affected: 3
Page 40

Page 41

18/12/1936 Anglo-American Oil Co. Ltd
DMB70002 Railway Paths
DMB84700 William G Thompson
10/05/1929 WDC
DMB19400 Alexander, Frances Barr
26/11/1964 British Railways Board
10/07/1933 Tsts George Js Fergusson-Buchanan
2/06/1853 Caledonian/Dunbartonshire Junction Railway
DMB26011 SRC
9/01/1952 Scottish Power
18/04/1967 Esso Petroleum Co Ltd
01/04/1955 Esso Petroleum Co Ltd
26/11/1936 Anglo-American Oil Co. Ltd and Messrs. Scott & Sons
18/12/1936 Anglo-American Oil Co. Ltd
29/09/1966 Esso petroleum Co Ltd
16/05/1919 Anglo-American Oil Co. Ltd
Page 41

Page 42

Page 42

Page 43

KEEPCLEAR KEEPCLEAR KEEPCLEAR
BUSSTOP
AREA: 463 Sq.M
PERIM: 137.168m
AREA: 306 Sq.M
PERIM: 148.918m
AREA: 7272 Sq.M
PERIM: 847.651m
Checked
Drawing Issue Status
Date of 1st Issue
Drawing Number
Designed
Revision
DrawnMark Revision ChkdDate
File Location: \\pba.int\gla\projects\30953 wdc exxon site access study\bim\cad\dwgs\wip\30953-stn-00-xx-dr-z-0006.dwg
UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this
drawing is believed to be correct, but no warranty to this is expressed or implied.  Other such plant or apparatus may also
be present but not shown.  The Contractor is therefore advised to undertake their own investigation where the presence
of any existing sewers, services, plant or apparatus may affect their operations.
SCALING NOTE:  Do not scale this drawing - any errors or omissions shall be reported to Stantec without delay.
© Crown copyright and database rights          . Unauthorised reproduction
infringes Crown copyright and may lead to prosecution or civil proceedings.
Ordnance Survey
user name: taylor, kris
Approved
Appd
Drawn
GLASGOW
Tel:  0141 352 2360
stantec.com/uk
Copyright reserved
The copyrights to all designs and drawings are the property of Stantec.
Reproduction or use for any purpose other than that
authorised by Stantec is forbidden.
EXXON SITE DEVELOPMENT PROJECT
LAND ACQUISITION PLAN FOR
ARNOLD CLARK
WEST
DUNBARTONSHIRE
COUNCIL
INFORMATION (S0)
00-XX-DR-Z-0006 P01
25.06.2020
1:1000
- GD
DMcL DMcD
100020790
2020
Client
A1 Scale
LEGEND
DENOTES LAND OWNED BY ARNOLD CLARK (DMB14332)
DENOTES LAND TAKE REQUIREMENT FOR CONSTRUCTION
DENOTES SITE BOUNDARY
242400 242500 242600 242700 242800
242400 242500 242600 242700 242800
674000
674100
674200
674300
674400
674000
674100
674200
674300
674400
Page 43

Page 44

LAND REGISTER
OF SCOTLAND
Officer’s ID / Date
N
ORDNANCE SURVEY
NATIONAL GRID REFERENCE
Survey Scale
C
DMB38818
70m
1/1250
NS4972SW NS4972SE NS47SE
30150
TITLE NUMBER
9/7/1997
Page 44

Page 45

KEEPCLEAR
AREA: 1636 Sq.M
PERIM: 226.167m
Checked
Drawing Issue Status
Date of 1st Issue
Drawing Number
Designed
Revision
DrawnMark Revision ChkdDate
File Location: \\pba.int\gla\projects\30953 wdc exxon site access study\bim\cad\dwgs\wip\30953-stn-00-xx-dr-z-0009.dwg
UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this
drawing is believed to be correct, but no warranty to this is expressed or implied.  Other such plant or apparatus may also
be present but not shown.  The Contractor is therefore advised to undertake their own investigation where the presence
of any existing sewers, services, plant or apparatus may affect their operations.
SCALING NOTE:  Do not scale this drawing - any errors or omissions shall be reported to Stantec without delay.
© Crown copyright and database rights          . Unauthorised reproduction
infringes Crown copyright and may lead to prosecution or civil proceedings.
Ordnance Survey
user name: taylor, kris
Approved
Appd
Drawn
GLASGOW
Tel:  0141 352 2360
stantec.com/uk
Copyright reserved
The copyrights to all designs and drawings are the property of Stantec.
Reproduction or use for any purpose other than that
authorised by Stantec is forbidden.
EXXON SITE DEVELOPMENT PROJECT
LAND ACQUISITION PLAN FOR
CHARLES CLEARY
WEST
DUNBARTONSHIRE
COUNCIL
INFORMATION (S0)
00-XX-DR-Z-0009 P01
25.06.2020
1:1000
- GD
DMcL DMcD
100020790
2020
Client
A3 Scale
LEGEND
DENOTES LAND OWNED BY CHARLES CLEARY
(11/04/1967)
DENOTES LAND TAKE REQUIREMENT FOR
CONSTRUCTION
DENOTES SITE BOUNDARY
242000 242100 242200
242000 242100 242200
674200
674300
674200
674300
Page 45

Page 46

KEEPCLEAR
KEEPCLEAR KEEPCLEAR KEEPCLEAR
AREA: 4292 Sq.M
PERIM: 562.198m
AREA: 868 Sq.M
PERIM: 233.617m
AREA: 968 Sq.M
PERIM: 272.821m
Checked
Drawing Issue Status
Date of 1st Issue
Drawing Number
Designed
Revision
DrawnMark Revision ChkdDate
File Location: \\pba.int\gla\projects\30953 wdc exxon site access study\bim\cad\dwgs\wip\30953-stn-00-xx-dr-z-0014.dwg
UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this
drawing is believed to be correct, but no warranty to this is expressed or implied.  Other such plant or apparatus may also
be present but not shown.  The Contractor is therefore advised to undertake their own investigation where the presence
of any existing sewers, services, plant or apparatus may affect their operations.
SCALING NOTE:  Do not scale this drawing - any errors or omissions shall be reported to Stantec without delay.
© Crown copyright and database rights          . Unauthorised reproduction
infringes Crown copyright and may lead to prosecution or civil proceedings.
Ordnance Survey
user name: taylor, kris
Approved
Appd
Drawn
GLASGOW
Tel:  0141 352 2360
stantec.com/uk
Copyright reserved
The copyrights to all designs and drawings are the property of Stantec.
Reproduction or use for any purpose other than that
authorised by Stantec is forbidden.
EXXON SITE DEVELOPMENT PROJECT
LAND ACQUISITION PLAN FOR
CHIVAS BROTHERS LIMITED
WEST
DUNBARTONSHIRE
COUNCIL
INFORMATION (S0)
00-XX-DR-Z-0014 P01
25.06.2020
1:1000
- GD
DMcL DMcD
100020790
2020
Client
A3 Scale
LEGEND
DENOTES LAND OWNED BY CHIVAS
BROTHERS LIMITED (DMB10946, DMB82940,
DMB38635)
DENOTES LAND TAKE REQUIREMENT FOR
CONSTRUCTION
DENOTES SITE BOUNDARY
242100 242200 242300
242100 242200 242300
674200
674300
674200
674300
Page 46

Page 47

KEEPCLEAR KEEPCLEAR KEEPCLEAR
BUSSTOP
AREA: 15651 Sq.M
PERIM: 612.942m
Checked
Drawing Issue Status
Date of 1st Issue
Drawing Number
Designed
Revision
DrawnMark Revision ChkdDate
File Location: \\pba.int\gla\projects\30953 wdc exxon site access study\bim\cad\dwgs\wip\30953-stn-00-xx-dr-z-0007.dwg
UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this
drawing is believed to be correct, but no warranty to this is expressed or implied.  Other such plant or apparatus may also
be present but not shown.  The Contractor is therefore advised to undertake their own investigation where the presence
of any existing sewers, services, plant or apparatus may affect their operations.
SCALING NOTE:  Do not scale this drawing - any errors or omissions shall be reported to Stantec without delay.
© Crown copyright and database rights          . Unauthorised reproduction
infringes Crown copyright and may lead to prosecution or civil proceedings.
Ordnance Survey
user name: taylor, kris
Approved
Appd
Drawn
GLASGOW
Tel:  0141 352 2360
stantec.com/uk
Copyright reserved
The copyrights to all designs and drawings are the property of Stantec.
Reproduction or use for any purpose other than that
authorised by Stantec is forbidden.
EXXON SITE DEVELOPMENT PROJECT
LAND ACQUISITION PLAN FOR
SUSAN JANE DICK
WEST
DUNBARTONSHIRE
COUNCIL
INFORMATION (S0)
00-XX-DR-Z-0007 P01
25.06.2020
1:1000
- GD
DMcL DMcD
100020790
2020
Client
A3 Scale
LEGEND
DENOTES LAND OWNED BY SUSAN JANE DICK
(DMB70815)
DENOTES LAND TAKE REQUIREMENT FOR
CONSTRUCTION
DENOTES SITE BOUNDARY
242300 242400 242500
242300 242400 242500
674100
674200
674300
674100
674200
674300
Page 47

Page 48

BUSSTOP
AREA: 748 Sq.M
PERIM: 228m
Checked
Drawing Issue Status
Date of 1st Issue
Drawing Number
Designed
Revision
DrawnMark Revision ChkdDate
File Location: \\gla-vfps-001\projects$\30953 wdc exxon site access study\bim\cad\dwgs\wip\30953-stn-00-xx-dr-z-0015.dwg
UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this
drawing is believed to be correct, but no warranty to this is expressed or implied.  Other such plant or apparatus may also
be present but not shown.  The Contractor is therefore advised to undertake their own investigation where the presence
of any existing sewers, services, plant or apparatus may affect their operations.
SCALING NOTE:  Do not scale this drawing - any errors or omissions shall be reported to Stantec without delay.
© Crown copyright and database rights          . Unauthorised reproduction
infringes Crown copyright and may lead to prosecution or civil proceedings.
Ordnance Survey
user name: stewart, craig
Approved
Appd
Drawn
GLASGOW
Tel:  0141 352 2360
stantec.com/uk
&RS\ULJKW UeVeUYeG
The copyrights to all designs and drawings are the property of Stantec.
Reproduction or use for any purpose other than that
authorised by Stantec is forbidden.
EXXON SITE DEVELOPMENT PROJECT
LAND ACQUISITION PLAN FOR
TRUSTEES FOR SSPCA
WEST
DUNBARTONSHIRE
COUNCIL
INFORMATION (S1)
00-XX-DR-Z-0015 P01
18.11.20
1:1000
- GD
DMcL DMcD
100020790
2020
Client
A1 Scale
242400 242500 242600 242700 242800
242400 242500 242600 242700 242800
674000
674100
674200
674300
674400
674000
674100
674200
674300
674400
LEGEND
DENOTES LAND OWNED BY TRUSTEES FOR SSPCA (DMB14027)
DENOTES LAND TAKE REQUIREMENT FOR CONSTRUCTION
DENOTES SITE BOUNDARY
Page 48

Page 49

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer: Supply, Distribution and Property
Council 31 August 2022 
Subject: Ventilation in Learning Establishments
1. Purpose
1.1 This report provides an update for members on indicative costs in relation to
ventilation across our learning estate.
2. Recommendations
2.1 It is recommended that Council:
2.1.1 notes the contents of the report and agrees no further action required
at present.
3. Background
3.1 At Council on 22 December 2021, Councillor Mooney moved the following
Motion:
Council agrees:-
(a) to note the types of ventilation systems across the Council’s learning
estate;
(b) to note the processes in place for monitoring levels of CO2 present in
learning and teaching spaces across the learning estate and with our
partner providers;
(c) to note that processes in place to escalate any area of concern and
steps taken to improve ventilation; and
(d) that a further report would come to Council with more detail on the
adequacy of ventilation systems in schools and the costs of improving
these.
3.2 The Motion was agreed by Council and a subsequent paper was submitted to
Council on 23 March 2022.
3.3 At Council on 23 March 2022
A report was submitted by the Chief Officer – Supply, Distribution and
Property providing an update on the approaches taken to ensure
adequate ventilation across our learning estate. After discussion and
Item 9
Page 49

Page 50

having heard the Chief Officer in further explanation and in answer to
Members’ questions, the Council agreed to note the contents of the report
and that a further report should be submitted to a future meeting of the
Council detailing the measures carried out to ensure adequate ventilation
of classrooms in winter, and the costs relating to these.
4 Main Issues
4.2 Following Council on 22 December 2021 officers were asked to provide
updated report detailing the adequacy of ventilation systems in schools and
any costs of improving the systems.  
4.3 Throughout the Council’s Learning Estate there is a variety of natural and
mechanical ventilation systems. This depends on when the building was
constructed and whether there has been any changes to the use of spaces
since construction and examples of this have been previously provided. 
4.4 Our newer constructed buildings have a mix of both mechanical and natural
ventilation throughout the building in teaching spaces, gym halls, kitchen and
toilet areas. 
4.5 Our older more traditional buildings are predominately natural ventilation with
window vents and mechanical ventilation is mostly confined to kitchen areas or
areas, which may have been refurbished since the original construction. 
Examples of where buildings may have been refurbished are as follows:-
o where an internal room not previously used as teaching space changes
to form a teaching space due to an increase in the school roll and
requires mechanical ventilation to be installed.
o refurbishment of toilets and a mechanical ventilation is installed as a
requirement for building standards purposes.
4.6 The Council were proactive in measuring the levels of CO2  prior to the
HSE guidance.  Towards the end of session 2020/21 the Council started a
process of measuring levels of CO2  present in teaching and learning
spaces across the learning estate.  This activity ran until November 2021
and gave base readings across all of our establishments.  
4.7 By December 2021 following Scottish Government funding CO2 monitoring
devices were installed in all our buildings across the learning estate to
cover learning and teaching spaces and other areas such as offices and
staff rooms.  In addition devices were distributed to partners providers.  
4.8 As previously advised to Council in December 2021 our baseline readings
showed that all of our learning and teaching spaces fell within an
acceptable range of 400 -1,000 ppm levels of CO2  concentration and
therefore indicating that the current ventilation within the learning estate
Page 50

Page 51

was more than adequate.
4.9 As previously advised a working group has been established and this
working group will continue to meet and monitor levels across the learning
estate ensuring comfortable learning and teaching conditions.  
4.10 All future new builds and refurbishments across the learning estate will
include ventilation systems if required in line with the current building
standards at the time of the build.
4.11 It is the conclusion following review of the learning estate that there are no
issues with the current ventilation within the learning estate and this is
demonstrated in the collected data to date.  
4.12 Following Council on 23 March 2022 where an indicative cost of
retrospectively installing mechanical ventilation a further detailed review
was carried out as requested by Council on each establishment across the
learning estate and can be found in Appendix 1.  This appendix details
indicative costs per establishment to retrospectively install mechanical
ventilation but the collected data does not support this as a requirement.
5 People Implications 
5.1 There are no people implications arising from this report.
6 Financial and Procurement Implications
6.1 Appendix 1 sets out the financial implications should Council decide to
retrospectively install mechanical ventilation in each establishment.
6.2 It should be noted that there is currently no budget allocation to fund any
future retrospective works. 
6.3 There are no Procurement implications because of this report.
7 Risk Analysis
7.1  Should Council not agree with the recommendations there are additional costs
of approximately £8.3m which would require capital funding to be allocated.  
7.2 Current ventilation systems within the school estate do not pose any significant
risk to staff and pupils.
8 Equalities Impact Assessment (EIA)
8.1 An equalities screening has been carried out for this report and there are no
equality issues identified.
Page 51

Page 52

9        Strategic Environmental Assessment (SEA)
A Strategic Environmental Assessment is not required for the purposes of
this report
10 Consultation
10.1 Consultation was undertaken with various officers across a number of
services including Resources, Education Services, Corporate Health &
Safety and Corporate Asset Management. 
11 Strategic Assessment
11.1 The provision of adequate ventilation in learning and teaching spaces
ensures healthy working and learning environments for our staff and
children, assisting us in delivering the strategic priority of efficient and
effective frontline services that improve the everyday lives of residents.
Angela Wilson 
Chief Officer, Supply, Distribution and Property
Date: 24 May 2022
Person to Contact: Michelle Lynn, Assets Co-ordinator
Email: michelle.lynn@west-dunbarton.gov.uk
Appendices: Appendix 1
Background Papers: Council – 22 December 2021.  Motion by Councillor
John Mooney.
Council – 22 December 2021.  Ventilation in Learning
Establishments.
Council – 23 March 2022.  Ventilation in Learning
Establishments.
Wards Affected: All wards
Page 52

Page 53

APPENDIX 1
GIA (sqm) Cost (based
on recent
new build)
Andrew B Cameron ELCC 278 £31,651
Auchnacraig ELCC 983 £111,883
Bonhill 4800 £437,184
Braehead 3435 £391,075
Brucehill ELCC 407 £46,301
Carleith 2312 £263,221
Choices 1443 £131,428
Christie Park 2393 £272,443
Clydebank ELCC 503 £57,287
Clydemuir 2346 £267,092
Dalreoch 2870 £326,750
Dalmonach ELCC 281 £32,035
Dalmuir ELCC 291 £33,116
Edinbarnet 3864 £439,916
Ferryfield ELCC 458 £52,103
Gartocharn 858 £97,683
Gartocharn ELC 167 £19,013
Gavinburn 2638 £300,336
Goldenhill 3600 £327,888
Kilbowie ELCC 338 £38,481
Kilbowie 1806 £164,490
Kilpatrick 3542 £322,605
Knoxland 2720 £309,672
Ladyton ELCC 2043 £232,575
Lennox (Faifley) ELCC 355 £40,468
Lennox 2311 £263,163
Levenvale 2357 £268,344
Linnvale 3224 £367,052
Our Holy Redeemer 1691 £192,520
Our Lady of Loretto 2355 £268,117
St. Joseph’s 2633 £299,767
St. Martin’s 1493 £169,978
St. Mary’s (Alexandria) 2578 £293,505
St. Mary’s (Duntocher) 2578 £234,804
St. Michael’s 1962 £178,699
St. Patrick’s 2375 £270,394
St. Ronan’s 2499 £284,511
St. Stephen’s 1658 £188,763
Whitecrook ELC 269 £30,626
Whitecrook 2129 £242,387
Establishment
£8,299,329
Page 53

Page 54

Page 54

Page 55

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer: Supply, Distribution and Property
Council: 31 August 2022
Subject: West Bridgend Hall
1. Purpose
1.1 To update Council on progress with West Bridgend Hall project following the
motion to Council on 22 June 2022.
2. Recommendations
2.1 It is recommended that Council:
2.1.1 note the contents of the report.
2.1.2 agrees that officers proceed to tender for a new build for West
Bridgend Hall whilst continuing to monitor all opportunities to either
negate or augment the Council funding already approved within the
ten-year capital plan.
3. Background
3.1 At Council on 22 June 2022 Council agreed the following motion:
The Council notes the report and the significant increase in costs since the
new Community Centre was first proposed. 
This Council reaffirms its supports for the Westbridgend Community Group
who have worked hard to get the group constituted and to develop their
business plan.  
The Council is fully committed to ensuring that the group secure a suitable
Community Centre for their area.
Council notes that the ten year capital plan already includes a new
Westbridgend Community Centre.  
The Council needs to demonstrate best value when committing public
funds therefore, prior to progressing with the new built option, council
officers are to explore whether the Church Hall which is up for sale and
which has accessible access old meet the organisation’s needs. This could
mean the facility could be available much quicker and at significantly lower
cost than the new build option. 
Item 10
Page 55

Page 56

This Council requests that officers bring a further report in August with
suitable options, highlighting any issues to allow the council to make it’s an
informed decision so that we demonstrate best value and can progress
with securing a suitable Community facility.
3.2 A decision was taken at Council on 22 February 2017 to fund the demolition of
West Bridgend Community Centre with a view that a Community Asset
Transfer application with a detailed business plan would be submitted by a
community group for future use.  Budget allocation at this time was £675k.
3.3 At the time of the budget setting in Feb 2017, the budget of £675k was based
on a previous new build hall.  The budget was assigned, it is believed, on
costs at that time based on a squaremetre basis but did not provide financially
for a number of actions – these are set out d in Appendix 1.  In addition, the
budget did not account for furniture, fixtures and equipment which will be
required to deliver the group’s ambitions within their business case. 
3.4 The allocation of budget included other projects  Dalmonach Community
Centre and 3 Sports Pavilions. Funding allocated to these projects appear to
have also been based on costs of previous projects delivered.
3.5 As time progressed it became apparent that the budget set at the time was
inadequate and this was reported via budgetary control reports.
3.6 Discussions with the group had been ongoing with the Strategic Lead for that
area since 2017.  An application was submitted by West Bridgend Community
Hall Development Association including a detailed business case on 4
February 2018.  The newly constituted group achieved charitable status in
July 2018.  The application contained a detailed business case to sustain a
suitable new build community facility to be built on the site of the former West
Bridgend Community Centre.
3.7 Key target groups for future use of the new build include children and families,
young people, people with disabilities, older people, people who have become
isolated through a variety of issues.  The group proposed to open the centre
as a community hub.  It is proposed that the community hub will include a
community café space, after school and evening clubs parent and toddler
groups, lunch clubs, arts and fitness clubs as well as bigger events such as
weddings, and family celebrations.  They envisage that this will bring a
positive impact on the lives of all residents in the area.  
4. Main Issues
4.1 In response to the June 2022 Council motion officers have made further
enquiries with Church of Scotland Estates section in relation to whether the
West Kirk, West Bridgend Dumbarton is available for sale following a review
of Church of Scotland services within Dumbarton area.  We have been
advised by Church of Scotland Estate section that no instructions to date have
Page 56

Page 57

been received to market any properties within the Dumbarton area, nor any
indications of a timeline of when this may be occurring.
4.2 In addition officers have been liaising with CVS and external funders
regarding opportunities for funding for the build or parts thereof but
unfortunately there are currently no funding streams available for these capital
works at present.
4.3 One potential funder it Regeneration Capital Grant Fund (RCGF) which is a
Scottish Government managed fund delivered in partnership with COSLA that
supports place-based regeneration projects.  The project currently does not
meet the RCGF delivery timescales for grant funding in 2023/24, however,
this will be reviewed in conjunction with the group for funding 2024/25 in
November 2022.
4.4  We will be working with the group and West Dunbartonshire CVS in relation to
potential funding from “the Big Lottery” and again, the group will be supported
by council officers with any application.  The outcome may not be known for
some time, potentially up to 12 months.  This may require advance transfer of
land to ensure match funding is confirmed.  
4.5 Given the lack of suitable alternative facility and any current funding
opportunities it is recommended that officers proceed to tender for the new
build whilst continuing to monitor all opportunities to either negate or augment
the council funding which has already been approved within the ten-year
capital plan.  This would include:
o Working with CVS and external funders for other opportunities which
may become available to access during the programme for the new
build;
o Monitoring other possible facilities, which may enable a facility to
become available sooner that will still be able to deliver the group’s
ambitions.
5. People Implications
5.1      There are no people implications arising from this report.
6. Financial and Procurement Implications
6.1 There are no further financial implications arising from this report in addition
to the detailed costings provided to Council on 22 June 2022. .
6.2 There are no procurement implications arising from this report.
7. Risk Analysis
7.1 There is a risk that should additional budget not become available the
aspirations set by Council in 2017 for a new build facility may not be met.
Page 57

Page 58

7.2 There is a risk that should the Trustees not extend their current term and new
Trustees not found then Westbridgend Community Hall Development
Association could cease to exist and the asset would then come back to the
Council ownership and the Council would incur additional revenue liabilities as
a result.
8. Equalities Impact Assessment (EIA)
8.1 An equalities screening has been carried out for this report and there are no
equality issues identified.
9. Strategic Environmental Assessment (SEA)
9.1 A Strategic Environmental Assessment is not required for the purposes of
this report.
10. Consultation
10.1 Consultation was undertaken with various officers across a number of
services including Resources, Education Services, Corporate Health &
Safety and Corporate Asset Management. 
11. Strategic Assessment
11.1 The provision of a new build hall will contributing to the Council’s
strategic priority for a strong local economy and improved job
opportunities and also assist us in delivering the strategic priority of
efficient and effective frontline services that improve the everyday lives of
residents.
Angela Wilson 
Chief Officer, Supply, Distribution and Property
Date: 17 August 2022
Person to Contact: Michelle Lynn, Assets Co-ordinator
Email: michelle.lynn@west-dunbarton.gov.uk
Appendices: None
Background Papers: Council – 9 March 2022.  General Services Budget
2022/23 and Council Tax Setting
Council – 22 June 2022.  West Bridgend Hall – Motion
from Council
Wards Affected: Ward 3
Page 58

Page 59

WEST DUNBARTONSHIRE COUNCIL
Report by Manager – Democratic and Registration Services
West Dunbartonshire Council: 31 August 2022
Subject: Request for Nomination to the Scottish Joint Council for Local
Government Employees
1. Purpose
1.1 To purpose of this report is to ask the Council to consider a request from
COSLA for nominations to the Scottish Joint Council for Local Government
Employees (SJC).
2. Recommendation
2.1 It is recommended that the Council agrees to nominate an elected member and
substitute elected member to the Scottish Joint Council for Local Government
Employees.
3. Background
3.1 A request has been received from COSLA inviting a nominee to sit on the
Scottish Joint Council for Local Government Employees.
4. Main Issues
4.1 The Scottish Joint Council is Scotland’s largest joint council in terms of both
employer representation and the number of employees covered.  The full joint
council is made up of:-
• 32 councillors and the COSLA Resources spokesperson; and
• 33 union representatives
4.2 The council is a decision making body that meets annually in November. 
However, in practice decisions about financial matters, and in particular pay, are
reserved for Council Leaders who provide negotiating remits.  
4.3 Each local government council has been asked to nominate one member plus
one substitute member to the SJC.  The SJC Constitution does not specify
anything particular about the councillors to be nominated and they need not be
the Council Leader or Depute Leader.  This Council’s Resources spokesperson
or its equivalent may be an appropriate nominee.  
Item 11
Page 59

Page 60

4.4 The SJC’s Constitution allows another councillor to substitute for the nominated
councillor should they be unable to attend any meeting.  The Council can
choose to nominate a substitute at this time or address this on an ad-hoc basis
should the need arise. 
5. People Implications
5.1 There are no personnel issues.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications.
7. Risk Analysis
7.1 Failure to nominate a councillor to the SJC may prevent West Dunbartonshire
Council being involved in the decision making process on matters that may
affect its employees.
8. Equalities Impact Assessment (EIA)
8.1 The Council’s representation on this body will have no adverse equality
impact.
9. Consultation
9.1 Officers in the legal and finance sections of the Council have been consulted
on the content of this report.
10. Strategic Assessment
10.1 The Council’s representation on the SJC will help contribute towards
achieving the Council’s strategic priorities.
George Hawthorn
Manager – Democratic and Registration Services
July 2022
Person to Contact: Christine McCaffary, Senior Democratic Services Officer,
Email: christine.mccaffary@west-dunbarton.gov.uk
Appendices: None
Background Papers: EIA screening
Wards Affected: All Wards
Page 60

Page 61

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
West Dunbartonshire Council: 31 August 2022
Subject:  Audit Committee Annual Report 2021-22
1. Purpose
1.1 The purpose of this report is to provide the Chair of the Audit
Committee’s (the Committee) annual overview of the Committee’s activity
during the financial year 2021/22. It sets out how the Committee has
fulfilled its remit and provides assurances to the Council.
2. Recommendations
2.1 It is recommended that members note the Annual Report on the Audit
Committee for 2021/22.
3. Background
3.1 This report was initially submitted to the Audit Committee on 15 June 2022
where it was agreed that the report should be referred to Council for
consideration.
3.2 A self-assessment was carried out on the Audit Committee as reported to
meeting on 12 December 2019.  This self-assessment was based on the
CIPFA publication “Audit Committees:  Practical Guidance for Local
Authorities and Police” (2018 Edition).  This included an action to introduce an
annual report on the Audit Committee to account for its performance and
explain its work.
3.3 The Audit Committee Annual Report for 2021/22 is intended to provide
assurance to West Dunbartonshire Council on the activity of the Audit
Committee.
4. Main Issues
4.1 The Audit Committee Annual Report for 2021/22 is appended with the main
issues identified being:
• The Audit Committee has met four times during the financial year with
every meeting being quorate;
• The Audit Committee sought assurance on the adequacy and
effectiveness of the Council’s systems of corporate governance and
internal control for efficient operations and for the highest standards of
probity and accountability.  This was achieved through reports received
Item 12
Page 61

Page 62

from internal audit, other Council functions and external audit with focus in
particular on internal control and governance;
• The Audit Committee has provided assurance to the Council as detailed in
the appendix.
5. People Implications
5.1 There are no personnel issues with this report.
6. Financial and Procurement Implications
6.1 There are neither financial nor procurement implications arising directly
from this report.
7. Risk Analysis
7.1 There is a risk that the Audit Committee does not comply with best practice
guidance in relation to demonstrating its effectiveness in providing a
foundation for sound corporate governance.  The annual report provides this
assurance to the Council on the activity of the Committee.
8. Equalities Impact Assessment (EIA)
8.1 There are no issues.
9. Consultation
9.1 This report has been subject to consultation with appropriate Strategic Leads.
In addition, services have been consulted in the update of action plans.
10. Strategic Assessment
10.1 This report relates to strong corporate governance.
....................................
Laurence Slavin
Chief Officer - Resources
Date: 4 August 2022
______________________________________________________________
Person to Contact: Andi Priestman Shared Service Manager – Audit & Fraud
Telephone (01389) 737436
E-mail: andi.priestman@west-dunbarton.gov.uk
Appendix: Annual Report on the Audit Committee 2021-22
Background Papers: Report to Audit Committee on 12 December 2018: Audit
Committee Self-Assessment and reporting on audit
assignments
Page 62

Page 63

Wards Affected: All Wards
Page 63

Page 64

Appendix 1
West Dunbartonshire Council
Audit Committee
2021/22 Annual Report from the Chair
Introduction
This annual report has been prepared to inform West Dunbartonshire Council of the
work carried out by the Council’s Audit Committee during the financial year 2021/22. 
Meetings
The Audit Committee met four times during 2021/22 comprising meetings on 16
June 2021, 15 September 2021, 17 November 2021 and 2 March 2022 to consider
reports relevant to the Audit cycle and other matters as deemed appropriate.  Pre-
Agenda meetings were also held ahead of Committee involving the Chair and
appropriate officers.  All four meetings were held remotely via Zoom and audio
recordings of meetings are available on the Council’s website.
The purpose and remit of Audit Committee as detailed in the Council’s Standing
Orders is to:
• Monitor, and make recommendations on the development of the Audit activity of
the Council.
• Scrutinise the monitoring and review activity of the thematic and regulatory
committees.
To fulfil this remit, the Audit Committee sought assurance on the adequacy and
effectiveness of the Council’s systems of governance, risk management and internal
control to ensure efficient operations and the highest standards of probity and
accountability.  This was achieved through reports received from Internal Audit, other
Council functions and External Audit with focus in particular on internal control and
governance.
At each meeting of the Audit Committee it considered significant findings from
Internal Audit reports together with monitoring the progress made by management in
completing agreed actions to improve the Council’s control environment.  It also
considered the annual audit plan and reports from Audit Scotland, the Council’s
External Auditors.  In addition, a number of national reports prepared by Audit
Scotland on behalf of the Accounts Commission were also considered.  
The Audit Committee also received reports on:
• Prudential Indicators and Treasury Management.
• Risk Management.
• National Fraud Initiative.
The minutes of Audit Committee meetings are first confirmed as a correct record at
the next Audit Committee before being remitted to Council for approval. 
Page 64

Page 65

Membership of the Audit Committee
In accordance with West Dunbartonshire Council’s Standing Orders membership of
the Audit Committee comprises eight Elected Members and two Lay Members with
Lay Members not being members of any political party.  The quorum of the Audit
Committee is three Elected Members.  
The Chair of the Audit Committee is from the Opposition (as is the Vice Chair).  The
committee has two Lay Members.  The Administration had a minority of members on
the Audit Committee.  One Lay Member, Christopher Todd, has tendered his
resignation from the Audit Committee and I wish to thank him for his service.  
Attendance by members of the Committee at Audit Committee meetings in 2021/22
was as follows:
Member Date of Meeting
16/06/21 15/09/21 17/11/21 2/03/22
Cllr John Mooney
(Chair)
Present Present Present Present
Cllr Jim Brown Present Present Present Present
Cllr Karen Conaghan Present Present Present Present
Cllr Daniel Lennie Apologies Present Present Present
Cllr Jonathan McColl Present Present Present Present
Cllr John Millar Apologies Present Present Apologies
Cllr Martin Rooney Present Present Present Present
Cllr Brian Walker  Apologies Absent Apologies Present
Lay Member Chris
Johnstone (from
12/12/18) 
Present Apologies Present Present
Lay Member
Christopher Todd
(from 16/09/20)
Apologies Present Present Present
Every meeting of the Audit Committee during 2021/22 was quorate.
Attendance by Officers
All meetings were attended by the Chief Executive, Chief Officer – Resources and
the Shared Service Manager - Audit & Fraud.
Other senior officers also attended meetings as appropriate for items on the Agenda
for which their presence was relevant. Representatives from the Council’s external
auditors - Audit Scotland - were present at every meeting.
Page 65

Page 66

Assurance Statement to the Council
The Audit Committee provides the following assurance to the Council:
• The Council has received the Minutes of the Audit Committee meetings
throughout the year.
• The Audit Committee has operated in accordance with its agreed terms of
reference, and accordingly with the audit committee principles in the CIPFA
Position Statement relating to its Audit functions.
• It did this through reports received from Internal Audit, External Audit, and
assurances from Management. It focussed on matters of governance, risk
management and internal control; giving advice to the Council on the value of the
audit process; on the integrity of financial reporting; and on governance
arrangements.
• For all audit reports, the Audit Committee considered whether it was satisfied that
an adequate management response was in place to ensure action would be
taken to manage risk and address concerns on governance, risk management
and internal control arrangements. The Committee acknowledges that all the
audit recommendations are input to Pentana, the Council’s performance
management system, and that there is a system in place of ongoing follow-up by
Internal Audit and reporting thereon.
• The Audit Committee has received and considered material to fulfil its scrutiny
role on treasury management activity.
• The Audit Committee reviewed the audited Annual Accounts for 2020/21
alongside External Audit’s report on their annual audit for 2020/21.
Conclusion 
Based on the reports received and reviewed by the Committee they are in
agreement with the Shared Service Manager – Audit & Fraud’s annual audit report
which confirms that reasonable assurance can be placed upon the adequacy and
effectiveness of the Council’s internal control system in 2021/22. I am satisfied that
active monitoring and follow up of recommendations is in place in respect of agreed
management action. 
Councillor Conaghan    
Chair of the Audit Committee
15 June 2022
Page 66

Page 67

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
Council: 31 August 2022
Subject: Unaudited 2021/22 Annual Accounts
1. PURPOSE
1.1 The purpose of this report is to provide Council with a copy of the unaudited
2021/22 Annual Accounts together with information as to the 2021/22 outturn
as set out in the draft accounts.
2. RECOMMENDATIONS
2.1 Members are asked to:
a) note the unaudited 2021/22 Annual Accounts
b) note the information provided in relation to the financial
performance of the Council’s services and capital plan for
2021/22
c) note the current position regarding the Council’s reserves;
d) note that a report on the audited accounts will be submitted to
either Council or Audit Committee by 31 October 2022 for
approval
e) if required to meet the timetable for submission, Council agrees to
delegate authority to the Audit Committee to formally approve the
audited accounts by 31 October 2022, prior to submission to the
Accounts Commission.
3. BACKGROUND
3.1 The annual accounts set out the financial statements of the Council and its
group for the year ended 31 March 2022. Its main purpose is to demonstrate
the stewardship of public funds entrusted to the Council. The requirements
governing the format and content of local authorities’ annual accounts are
contained in the Code of Practice on Local Authority Accounting in the
United Kingdom (the Code). The 2021/22 accounts have been prepared in
accordance with this Code.
3.2 There is a statutory requirement to prepare a set of accounts and submit
them to the Controller of Audit. The date set by the Scottish Government for
the submission of the unaudited annual accounts is 30 June each year.
4. MAIN ISSUES
4.1 The Council’s draft 2021/22 annual accounts, including the group accounts,
were submitted the Controller of Audit before the 30 June 2022 deadline and
our external auditors (Audit Scotland) have commenced their audit.
Item 13
Page 67

Page 68

4.2 The draft accounts show that the Council has been successful in managing
its 2021/22 expenditure within the budgets approved for the General Fund
with the Housing Revenue Account (HRA) reporting an in-year deficit which
is in line with the HRA financial plan to fund some capital from revenue to
reduce the cost of borrowing.
4.3 Since 2010/11, local authorities have been required to prepare financial
statements following International Financial Reporting Standards (IFRS).
Under the Local Authority Accounts (Scotland) Regulations 2014 there is a
requirement to include a management commentary in the accounts. The
contents of the annual accounts are summarised in the paragraphs that
follow.
4.4 Management Commentary: outlines the key messages regarding the
objectives and strategy of the Council and its financial performance for the
year. It also looks forward, outlining the future financial plans for the
organisation and the challenges and risks which are faced by the Council.
4.5 Statement of Responsibilities for the annual accounts: outlines the
Council’s responsibilities and also the responsibilities of the Council’s
Section 95 Officer.
4.6 Annual Governance Statement: this details the view on the adequacy of its
governance and internal control system. It is the Council’s view that the
systems for governance and internal control are operating effectively within
the Council during 2021/22 and that there are no significant weaknesses.
4.7 Remuneration Report: provides details of the remuneration policy,
remuneration and pension benefits of senior councillors and senior officers in
addition to detail on employee exit packages.
Comprehensive Income and Expenditure Statement (CIES):
4.8 This statement shows the accounting cost of providing services rather than
the amount to be funded from taxation. The Council is required to make
various statutory accounting adjustments to the net cost of services as
reported in the budgetary outturn in order to comply with the Code. These
accounting adjustments include depreciation, loans fund principal repayment
and accrued holiday leave not taken by 31 March 2022.
4.9 The Council ended the year with a surplus of £102.966m for 2021/22, this is
the accounting surplus based on the IFRS compliant accounts rather than
the movement in the General Fund Balance. The total Comprehensive
Income and Expenditure comprises of a deficit on the provision of services of
£41.992m, which is reduced by a surplus on the revaluation of Long Term
Assets of £4.917m and an actuarial gain on the pension fund assets/liability
of £140.041m.
4.10 The table below, sets out a reconciliation of the deficit on the provision of
services of £41.992m as noted in the Statement of Comprehensive Income
Page 68

Page 69

and Expenditure to the revenue budget outturn of £0.159m underspend.
4.11 Balance Sheet: The Balance Sheet shows that the net worth of the Council
has increased by £102.967m from £318.629m as at 31 March 2021 to
£421.596m as at 31 March 2022. The major changes are set out in the table
below.
Movement in Reserves Statement
4.12 This shows the movement on the different reserves held by the Council,
analysed into usable reserves (resource backed reserves which can be used
to fund expenditure) and unusable reserves (required purely for accounting
purposes and are not backed by resources).
4.13 The total Council reserves have increased from £318.629m at 31 March
2021 to £421.595m at 31 March 2022, an increase of £102.966m.
4.14 The balance of unusable reserves has increased by £108.125m from
£294.418m as at 31 March 2021 to £402.543m as at 31 March 2022. The
main reason for this increase is a material reduction in the pension scheme
Page 69

Page 70

liability from a liability of £163.315m in 2020/21 to a liability of £55.690m in
2021/22 (a decrease of £107.625m).  
4.15 In respect of the General Fund Balance movement, there has been a small
decrease of £0.008m from a balance of £15.028m to £15.020m.  Of that total
£11.525m is earmarked for specific purposes.  The Council has agreed to
hold a contingency balance equivalent to 2% net expenditure (excluding
requisitions) and this amounts to £3.123m. The remaining General Fund
balance (unearmarked balance) amounts to £0.372m.
4.16 Cash Flow Statement: The Cash Flow Statement shows the changes in
cash and cash equivalents of the Council during the financial year. The Cash
and Cash Equivalents decreased by £10.101m to £2.140m.
4.17 Notes to the Financial Statement: The notes section provides further
information and explanation on some of key figures included within the
Accounts. The notes conform to the guidance issued by CIPFA/LASAAC
within the Code of Practice on Local Authority Accounting.
4.18 Council Tax Income Account: This account shows the gross income raised
from council tax levied and deductions made under the Local Government
Finance Act 1992. The resultant net income is transferred to the CIES.
Council Tax rate for Band D was £1,293.55 for 2021/22 which was identical
to 2020/21 due to a council tax freeze agreed by Council as part of the
budget setting process. The income transferred to the general fund for
Council Tax in 2021/2221 was £38.207m. This compared to £36.765m in
2020/21.
4.19 Non Domestic Rate Income Account: This account is an agent’s
statement that reflects the statutory obligation for billing authorities to
maintain a separate Non Domestic Rate Account. Net Non Domestic Rate
Income to the Consolidated Income and expenditure Account amounted to
£81.408m for 2021/22. This compares to £55.963m in 2020/21, which was
artificially reduced due to the package of measures introduced by the
Scottish Government to support the Scottish businesses affected by the
COVID outbreak.
4.20 Housing Revenue Account
In relation to the HRA, the draft accounts show a balance of £2.734m as at
31 March 2022. Of this balance £1.794m is earmarked to assist in a number
of areas, including the regeneration of the Housing estate, as agreed by a
previous Council decision, leaving an un-earmarked balance of £0.940m,
which is in line with the prudential reserve target. 
4.21 Capital Programmes
Details of the capital programmes are shown in Appendix 4 (General Fund)
and Appendix 5 (HRA) and are summarised below. The appendices detail
the outturn of the projects within 2021/22 and provide further information on
the projects which have been identified as red status (i.e. those projects
Page 70

Page 71

which are likely to be significantly overspent and/or to have significant delays
in completion). A list of the main capital projects progressed during 2021/22
is provided on page 16 of the Annual Accounts. The year end position is
summarised as follows:
Budget Spend Variance Overspend Underspend Slippage
£,000 £,000 £,000 £,000 £,000 £,000
General Services 56,727 33,620 (23,107) 1,934 (83) (24,958)
HRA 48,328 30,600 (17,728) 3,701 (1,503) (19,926)
Total 105,055 64,220 (40,835) 5,635 (1,586) (44,884)
4.22 The main areas of slippage in the year were:
General Services
District Heating
Expansion
Network expansion to Golden Jubilee National
Hospital will commence pending positive
commercial discussions.  
Heritage
Capital Fund
COVID impacted on the timescale for delivery of a
number of projects including Clydebank Town Hall,
the Clydebank Museum, and the Dalmuir Library
and Gallery. Work is now underway to get these
projects progressed. 
Vehicle
Replacement
Delay due to the vehicle build time associated with
the specialist vehicles and the delivery lead time
from the date of supply order placement.
Schools Estate
Improvement
Plan
As a result of COVID Skills School was rephased
during 2021/22 and further costs are still expected
for Renton Campus.
HRA
New house
build
Due to a number of different complexities there
were delays to getting on site across each of the
new build sites.
Projects to
deliver housing
strategies (Buy
Backs)
These are subject to stringent criteria to ensure
accountability and value for money for tenants and
involves several key stakeholders which resulted
in time delays
Doors/Windows Installations are behind original planned targets
due to internal and external contractor resource
issues
Page 71

Page 72

Building
external
components
Resource issues has delayed the roof renewal
programme which continues into 2022/23.
Additional installations by support contractors is
underway to assist completions
4.23 Group Accounts: The Council is required to prepare Group Accounts in
addition to its own Annual Accounts. Group Accounts are prepared when a
Council has a material interest in other organisations. The purpose of the
accounts is to combine its financial information with other organisations
within its group. For 2021/22 the Council’s group consists of
(a) West Dunbartonshire Leisure Trust
(b) Dunbartonshire and Argyll and Bute Valuation Joint Board
(c) Strathclyde Partnership for Transport
(d) Strathclyde Concessionary Travel Joint Board
(e) Clydebank Property Company
(f) West Dunbartonshire Energy Company
(g) Health and Social Care Integrated Joint Board
(h) Dumbarton Common Good and Trust Funds.
4.24 The effect of combining these entities on the Group Balance Sheet is to
increase reserves and net assets by £48.600m creating an overall net asset
of £470.195m. 
4.25 Update on Transformational Projects
Following recent (but temporary) Scottish Government legislation, the
Council agreed as part of its budget for 2021/22 to use capital receipts to
fund some transformational spend. The budgeted spend approved by
Council was £0.526m, the actual spend as at 31 March 2022 was £0.383m.
Appendix 6 provides further details of these transformational projects and
the position regarding these as at 31 March 2022.
Next Steps
4.26 To enable the Council to meet its legislative requirements, Members require
to approve the audited Annual Accounts for signature no later than 31
October 2022. Therefore, depending on progress in auditing the accounts
the audited accounts will be presented to a future Council before 31 October
2022.
Charity Accounts
4.27 Appendix 7 provides Members with the accounts of the Trust Funds which
are administered by the Council. These Financial Statements are also
audited by our external auditors prior to submission to the Office of the
Scottish Charity Regulator (OSCR). The draft Financial Statements 2021/22
were presented to Audit Scotland on 28 April 2022. As noted at 4.24 above
these are also included within the Council’s Group position.
Page 72

Page 73

The main movements within the Trusts are noted below – interest gained
was received for all trusts, with one grant payment made (Dr AK Glen).
Opening
Balance
£
Receipts
£
Payments
£
Closing
Balance
£
Educational Trust Scheme 90,433 62 0 90,495
McAuley Prize for
Mathematics
21,884 14 0 21,898
Alexander Cameron
Bequest
117,776 2,492 0 120,268
Dr AK Glen 24,732 16 (19,800) 4,947
UIE Award 24,741 16 0 24,757
Cash and Bank 279,565 2,600 (19,800) 262,365
Educational Trust Scheme 218 0 0 218
Investments 218 0 0 218
Overall Total 279,783 2,600 (19,800) 262,583
The audited Trust Fund accounts will be approved by the Council, together
with the Council’s Financial Statements, but will be presented to the Trust
Committees separately.
4.28 Common Good
Appendix 8 provides Members with the accounts of the Dumbarton Common
Good which are administered by the Council, also audited by our external
auditors as part of the year end process. As noted at 4.24 above this is also
included within the Council’s Group position.
The main movements within the common good are noted below:
£
Opening Balance 520,642
Income 320,272
Expenditure (259,602)
Closing Balance 581,312
CONCLUSION
4.29 The Unaudited Annual Accounts have been prepared in accordance with
professional and statutory requirements. The General Fund Balance has
decreased by £0.008m, after taking into consideration the movement during
the year, the end of year outturn position and earmarkings. The net worth
per the balance sheet has increased by £122.814m to £468.184m. Overall
the financial position of the Council remains stable.
5. PEOPLE IMPLICATIONS
5.1 There are no people implications as a consequence of this report.
Page 73

Page 74

6. FINANCIAL AND PROCUREMENT IMPLICATIONS
6.1 There are no direct financial or procurement implications arising from this
report.
7. RISK ANALYSIS
7.1 No risk analysis was required
8. EQUALITIES IMPACT ASSESSMENT (EIA)
8.1 No equalities impact was required in relation to the preparation of this report.
9. CONSULTATION
9.1 The views of Legal Services have been requested on this report and have
advised there are neither any issues nor concerns with the report.
10. STRATEGIC ASSESSMENT
10.1 Sound financial practices are cornerstones of good governance and support
Council and officers to pursue the 5 strategic priorities of the Council’s
Strategic Plan.
Laurence Slavin
Chief Officer - Resources
Date:   31 August 2022
Person to Contact: Gillian McNeilly, Finance Manager, 16 Church Street, Dumbarton 
E-mail: gillian.mcneilly@west-dunbarton.gov.uk
Appendices
1. Draft Annual Accounts to 31 March 2022 for West Dunbartonshire
Council
2. General Services Budgetary Control Report to 31 March 2022 – Revenue
3. HRA Budgetary Control Report to 31 March 2022 – Revenue
4. General Services Budgetary Control Report to 31 March 2022 - Capital
5. HRA Budgetary Control Report to 31 March 2022 - Capital
6. Update on transformational spend 2021/22
7. Draft Annual Accounts to 31 March 2022 for Trust Funds
8. Draft Position to 31 March 2022 for Dumbarton Common Good
Background Papers
Budget Report to Council - 22 March 2021
Budget Report to Council - 9 March 2022
Local Government Finance Circular 4/2019 – capital receipts to fund
transformational projects
Page 74

Page 75

DRAFT ANNUAL ACCOUNTS
FOR THE YEAR ENDED
31 MARCH 2022
Page 75

Page 76

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
1
Table of Contents
Page Page
Management Commentary 2 Note 21 Impairment Losses 86
Note 22 87
Explanatory and Assurance Statements
Statement of Responsibilities 23 Note 23 Debtors 88
Annual Governance Statement 24 Note 24 Common Good Fund 88
Remuneration Report 31 Note 25 Trust Funds 89
Note 26 Cash and Cash Equivalents 90
Principal Financial Statements - Single Entity Note 27 Financial Instruments 91
Comprehensive Income and Expenditure Statement 39 Note 28 Creditors 97
Movement in Reserves Statement 40 Note 29 97
Balance Sheet 41
Cash Flow Statement 42 Note 30 Other Reserves 98
Note 31 Contingent Assets and Liabilities 101
Notes to Single Entity Note 32 Financial Guarantee 102
Note 1 Accounting Policies 43
Note 2 55 Supplementary Financial Statements
103
Note 3 56 Housing Revenue Account Income and 104
Expenditure Statement
Notes to the Housing Revenue Account Income and 105
Note 4 Accounting Standards that have been 58 Expenditure Statement
issued but have not yet been adopted Council Tax Account 106
Note 5 Material Items of Income and Expense 59 Non Domestic Rates Account 107
Note 6 60
Principal Financial Statements - Group
Note 7 Events After the Balance Sheet Date 64 Group Accounts 108
Note 8 Related Parties 64 Group Comprehensive Income and Expenditure 110
Note 9 Agency Services 68 Statement
Note 10 Grant Income 69 Group Movement in Reserves Statement 111
Note 11 Operating Leases 70 Group Balance Sheet 112
Note 12 Termination Benefits 71 Group Cashflow Statement 113
Note 13 Defined Benefit Pension Schemes 71
Note 14 External Audit Costs 76 Notes to Group
Note 15 Expenditure and Funding Analysis 76 Notes to the Group Accounts 114
Note 16 Property, Plant and Equipment 81
Note 17 Intangible Assets 84 Glossary
Note 18 Assets Held for Sale 84 Glossary of Terms 119
Note 19 Heritage Assets 85
Note 20 86Capital Expenditure and Capital
Financing
Private Finance Initiatives and Similar
Contracts
Assumptions Made About the Future and
Other Major Sources of Estimation
Uncertainty
General Fund & HRA Reserves and
Earmarked Balances
Movement on the Housing Revenue Account Statement
Critical Judgement in Applying
Accounting Policies
Adjustments between funding accounting
basis and funding basis under regulations
Page 76

Page 77

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
2
Management Commentary   
1. Introduction 
Welcome to the financial statements for West Dunbartonshire Council (the Council) and its group for
the year ended 31 March 2022. The statements have been compiled in accordance with the Code of
Practice on Local Authority Accounting in the United Kingdom (the Code). This Management
Commentary will demonstrate the stewardship of public funds entrusted to the Council and outlines
the key messages regarding the performance of the Council over the 2021/22 financial year as well
as providing an indication of risks and issues which may impact upon the Council in the future.   
2. Profile of West Dunbartonshire Council 
The Council is an average sized
Council at around 71 square miles and
has many strengths; including
significant sites of natural beauty and
heritage, good transport links and close
proximity to Glasgow and its airport.
The area has a rich past, shaped by its
world-famous shipyards along the
Clyde, and boasts many attractions
ranging from the iconic Dumbarton
Rock and the Titan Crane, to the
beauty of Loch Lomond. 
The Council is responsible for providing
a wide range of local authority services
(including education, housing,
environmental health, environmental
services, planning, economic
development, employment, highways
and transport) to residents within the
West Dunbartonshire area. 
The Council is led by 22 councillors,
elected every five years to represent
the residents within the area. Following
the Local Government elections in May
2017, the Council had a minority SNP
administration with Councillor Jonathan
McColl as its Leader. The Local
Government Elections in March 2022
returned a majority Labour
administration and Councillor Martin
Rooney was appointed as the new
Council Leader.
Page 77

Page 78

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
3
Management Commentary
During 2021/22 the senior management structure
consists of the Chief Executive, eight Chief Officers, with
the Integration Joint Board (referred to as Health and
Social Care Partnership (HSCP)) managed at a senior
level by a Chief Officer. In addition the Council retained
20% of the time of the former Strategic Director of
Regeneration, Environment and Growth who, since
October 2020 is seconded to the Glasgow City Region for
a two year period.
The Council also has:
 West Dunbartonshire Leisure Trust – an arms
length organisation which operates certain
services on the Council’s behalf
 a regeneration company called Clydebank
Property Company
 West Dunbartonshire Energy Company which is
an energy generation company 99.9% owned by
the Council.
In early 2022 Joyce White announced her intention to stand down as the Council’s Chief Executive and,
in June 2022, Peter Hessett was appointed as the Council’s new Chief Executive.  
3. The Strategic Plan, Vision and Priorities
Nationally, the Scottish Government sets out its joint priorities and local authorities, in conjunction with
community planning partners, agree a planned approach aligned to these through the Local Outcome
Improvement Plan (LOIP). The Council’s LOIP, covering the period from 2017 to 2027, feeds through
into our 2017-2022 Strategic Plan which sets out our commitment to improving outcomes in key areas
to deliver on our vision that: 
West Dunbartonshire Council will deliver high quality services, led by priorities identified by the
communities of West Dunbartonshire, in an open and transparent way
The Strategic Plan identifies the following five priorities aligned to the Council’s vision:
 A strong local economy and improved job opportunities.
 Supporting individuals, families and carers living independently and with dignity.
 Meaningful engagement with active, empowered and informed citizens who feel safe and
engaged.
 Open, accountable & accessible local government.
 Efficient and effective frontline services that improve the everyday lives of residents.
To support delivery of the Strategic Plan and the Council’s strategic objectives each Chief Officer has
developed Service Delivery Plans. These are refreshed annually and progress reported to relevant
committees every six months. The HSCP also has a Strategic Plan which is linked to the Council’s
and the LOIP.
4. Performance Reporting
The Council monitors and reports its performance against these priorities through the Strategic Plan
Scorecard (SPS); where planned performance targets are monitored through a suite of key
performance indicators. Performance is reported to Council and Committees for scrutiny and
identification of any required remedial action. The Council also publishes an annual Public
Performance Report which provides residents with a summary of progress being made.
Page 78

Page 79

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
4
Management Commentary 
In conjunction with this internal SPS, the Council (together with all Scottish local authorities)
measures a common set of performance indicators called the Local Government Benchmarking
Framework. Using the same indicators across all councils allows comparisons of performance,
identification of best practice and enables councils to learn from each other. Full details of the most up
to date performance information are available on the Council’s website at: www.west-
dunbarton.gov.uk/council/performance-and-spending/ 
Some of our achievements in 2021/22, in relation to our five strategic priorities, are highlighted below. 
Priority 1 - A strong local economy and improved job opportunities 
We continued our strong focus on town centre regeneration securing Levelling Up Funding to
transform Dumbarton with a state of the art new museum and library and redeveloping the Artizan
Centre. We also finalised 10-year investment plans for Alexandria and Clydebank focusing on
boosting local enterprise and community activity, celebrating the towns’ heritage and making it safe
and easy for citizens to move around.   
We progressed the £34.1million Glasgow
City Region City Deal project which will
provide up to 980 full-time jobs and a further
670 during construction. 
We also invested in the Scottish Marine
Technology Park at Carless, which is
expected to create 1,000 local jobs and
bring £65.6 million annually to the Glasgow
City Region economy. In addition, we
provided support to 200 new business start-
ups, took on 50 modern apprentices with a
further £1million investment planned over
the next four years and supported 90.99% of
school pupils to leave school to a positive
destination. 
Priority 2 - Supported individuals, families and carers living independently and with dignity.
Improving the lives of the people of West Dunbartonshire is at the heart of our work 
An increased £75 million investment in our housing
stock has provided 530 additional affordable,
sustainable, accessible and adaptable housing
options that meet the changing needs of our
population. Among those projects is the new 147
home development at Queens Quay which will be
supplied by affordable, environmentally sustainable
energy from the multi-award winning Energy Centre
and District Heating network. 
Tackling the root causes of poverty is at the forefront of the Council’s Working4U service, providing
advice to sustain or increase income through employment and benefit maximisation. We assisted
288 people to secure a Foundation Apprenticeship/Modern Apprenticeship and make progress in
the workplace. We also supported 420 people to secure employment and assisted residents to
secure an additional £7.2million of benefits, and manage £2.5m of debt. In addition, Working4U
supported 993 people to enter education and training and 457 people have subsequently secured a
full qualification that will allow them to pursue their life and career ambitions. 
Page 79

Page 80

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
5
Management Commentary 
Priority 3 - Meaningful engagement with active, empowered and informed citizens who feel
safe and engaged 
Our commitment to empowering citizens is
demonstrated in the implementation of our
Community Empowerment strategy and
action plan, which helps citizens to help
themselves and provides opportunities for
the Council to work in partnership with
citizens in local decision-making.   
A review of the scheme for establishment
of community councils was undertaken,
consulting with existing community
councils, the Community Council Forum, 
active community groups in areas with no community councils at present and citizens to update
and improve how they operate. To reduce the impact of antisocial behaviour we installed additional
CCTV cameras, increased the presence of our antisocial behaviour team and extended the hours
in which citizens can contact them for support. 
Priority  4 - Open, accountable and accessible local government 
The Council believes in equity
and accessibility for all residents.
During the pandemic, we
continued to hold Council
meetings online, giving citizens
the opportunity to ask questions,
raise concerns and listen to
proceedings. Many services were
updated to online to ensure
citizens could continue to access
services and receive support.  On
average, the Council answered
8,000 calls every month from
citizens. 
We are committed to ensuring everyone has the opportunity to have their say and in particular to
increase participation from under-represented groups.  Working4U worked with partners to provide
citizens with access to devices, free Wi-Fi and support to use them. The programme focused its
efforts on those most likely to face digital exclusion with priority given to older people who were in
the COVID shielded group, families who are facing disadvantage and disabled people. As part of a
four-year equality plan approved in May 2021, the Council has established the Stronger Voices
community group, which is helping the Council increase participation of under-represented groups. 
Priority 5 - Efficient and effective frontline services that improve the everyday lives of
residents 
The Council is committed to providing sustainable and attractive local communities which make
residents proud of the area they live in. We invested £3.6million in Lomond Bridge, Balloch. Works
included modified steelwork which was refurbished and painted; a replaced bridge deck, as well as
new lighting and parapet renewal. 
We recognise the importance a healthy diet plays in a child’s development and the health and
wellbeing of our young people is a priority. Free school meals are available for all pupils in Primary 
1 to Primary 5 in West Dunbartonshire, giving our children a freshly prepared, nutritionally balanced
meal every day. 
Page 80

Page 81

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
6
Management Commentary
We were one of the first councils in Scotland
to introduce 1140 hours of free early
learning and childcare ahead of schedule.
We provide 1140 hours of childcare to all
three and four-year-olds as well as eligible
two-year-olds. The Council recruited more
than 400 employees to support the
introduction, refurbished 15 existing centres,
introduced 10 new centres and built four
new Early Learning Centres.  
5. Council’s 2021/22 Budgets
Revenue
The Council approved the 2021/22 revenue budget on 22 March 2021 based on band D council tax at
£1,293.55. The budget was set at £231.919m (as detailed in the table below) to be funded by Scottish
Government Grant (£193.854m); council tax (£37.053m), with a net contribution from reserves for the
remainder (£1.012m).  
Service Area Budget (£m) % of Budget
Corporate Services 32.280 13.92%
Educational Services 103.682 44.71%
Infrastructure, Regeneration and Economic Development 12.034 5.19%
Housing and Communities 3.224 1.39%
Health & Social Care Partnership, including Criminal Justice 74.122 31.96%
Loan charges 6.523 2.81%
Other 0.054 0.02%
Total 231.919 100.00%
The budget was updated during the year for a number of variables, resulting in a final planned net
expenditure of £252.986m. The year-end revenue budgetary position is detailed on page 9 of this
commentary.
Capital
On 22 March 2021 the Council also approved the revised capital plan with a planned General
Services spend in 2021/22 of £18.835m and re-phased capital from the previous year of £29.223m
making a total of £48.058m. In-year additional projects increasing the planned spend by £8.622m to
£56.680m.  This investment is funded from a range of sources including: government grants and
council ongoing revenue. Major areas of investment are economic regeneration, schools
modernisation, roads and infrastructure and a range of other Council assets. The year end capital
budget position is further detailed on page 16.
Housing Revenue Account
On 3 March 2021 the Council approved the Housing Revenue Account budget and agreed an
increase in council house rents of 1.5% with planned capital investment for 2021/22 of £34.591m, and
re-phased capital from the previous year of £15.153m making a total of £49.744m. Further in-year
changes updated the planned spend for 2021/22 to £48.328m. The year-end revenue budgetary 
position is detailed on page 10 of this commentary, with the capital year end budgetary position
shown on page 16.
Page 81

Page 82

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
7
Management Commentary 
6. Overview of Core Financial Statements 
The Statement of Accounts contains the Financial Statements of the Council and its group for the
year ended 31 March 2022. The Council operates two main Funds: 
1. General Fund - expenditure and income associated with running council services (except the
provision of council houses).  Predominantly funded by Scottish Government grant and council tax. 
2.  Housing Revenue Account - expenditure and income associated with the provision of council
housing. Predominantly funded primarily through rental income from tenants. 
Two major categories of expenditure are included in the financial statements:    
1. Revenue expenditure - day to day running costs incurred to provide services. 
2. Capital expenditure - cost of buying, constructing and improving the assets which the Council uses
to provide services. 
Expenditure is recorded in a number of the main statements in these accounts with the purposes of
these main statements being as follows: 
 Comprehensive Income and Expenditure Statement (page 39) - shows the income and
expenditure for all council services.
 Movement in Reserves Statement (page 40) - shows how the Income and Expenditure Account
surplus or deficit for the year reconciles to the movement on the General Fund for the year. It also
highlights movement on all other reserves held on the Council’s Balance Sheet (including the
Housing Revenue Account).  Further information on each of the reserves held and how they may
be used is also detailed within notes 29 and 30 on pages 97 to 101.
 Housing Revenue Account (pages 103-105) - shows the income and expenditure for council
housing services for the year and also includes the Statement of Movement on the Housing
Revenue Account Balance.
 Capital expenditure (page 86, note 20) - details the capital expenditure and the sources of
finance used to fund the capital plan investment in 2021/22.
 Balance Sheet (page 41) - summarises the assets and liabilities of the Council. It is a statement of
the resources of the Council and the means by which they have been financed.  It is also a report
on the Council’s financial position at one particular point in time, a snapshot of its financial affairs
at the close of the year expressed in accounting terms.
 Cash Flow Statement (page 42) - shows the inflows and outflows of cash arising from
transactions with third parties on both day to day revenue transactions and on capital
activities.  Cash is defined for the purpose of the statement as cash-in-hand and deposits
repayable on demand less overdrafts repayable on demand.
 Notes to the Core Financial Statements (pages 43-102)  provide further information and
analysis of each statement, including the main accounting policies detailed on pages 43 to 55. 
7. 2021/22 Financial Performance 
Revenue: Outturn against Budget 
General Fund
This account covers the day to day operational income and expenditure for each service of the Council
and is reported in line with the Council’s committee structure. Income from council tax, non-domestic
rates, capital and revenue support grants was £260.765m with a net expenditure on services for the
year of £279.317m (shown on page 39 - Net Cost of Services). 
Page 82

Page 83

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
8
Management Commentary
Due to tight financial control over service spending, the Council was able to return an in-year surplus
from services of £0.159m against budget (2020/21 £0.585m surplus).  The main favourable variances
(particularly within Corporate Services and Education service areas) are due to specific management
action in areas such as control of vacancies and staff cover; general process and efficiency reviews;
and spending control, with a one-off adjustment for Council Tax income. Although, there is an element
of demand led favourable variances, these have been partially offset by cost pressures, particularly
within vacant building costs (such as former HSCP properties) and within the Infrastructure,
Regeneration and Economic Development service areas due mainly to commercial rental income and
the Housing Maintenance Trading Account outturn. During the Council’s annual budget process,
efficiencies are identified and agreed for action. These savings are monitored monthly as part of the
budgetary control process. For 2021/22 the savings monitored were valued at £3.212m, with the
target reduction to the budget being achieved in year. 
The Council's in-year collection of council tax increased from 94.18% in 2020/21 to 94.53% in
2021/22. It is positive that collection has improved given the continued impact that COVID had in
2021/22 on the ability of people to pay council tax.  The Council continued to allow eased payment
terms and follow up processes to assist residents impacted, provided key financial support and
assistance during the year and would expect payments to be caught-up in future years.
After taking account of the decrease in general earmarked balances since 31 March 2021 (£0.167m),
the net commitment to future budgets (£1.219m, included within the overall earmarked balance) and
the in-year budgetary position (£0.159m), the overall deficit for the year was £0.008m. 
This results in an accumulated surplus at 31 March 2022 of £15.020m (as shown on page 40),
compared to the previous year value of £15.028m). This includes an earmarked amount of £11.524m
leaving an unearmarked balance of £3.496m available for future use. Of the earmarked reserves
£6.648m is for COVID purposes leaving £4.876m of general earmarked reserves, of which £1.257m is
set aside for the Council’s Change Fund, £1.018m of Scottish Government funding for the Young
Person’s Guarantee and £1.219m is committed to the delivery of a balanced 2022/23 budget. 
This unearmarked balance compares with that of £3.337m as at 31 March 2021 and shows that the
unearmarked reserve position has increased by £0.159m during the year. The Council's Prudential
Reserves Policy is to retain a prudential reserve of 2% of net expenditure (excluding requisitions to
HSCP, Valuation Joint Board, SPT, etc.) in order to safeguard assets and services against financial
risk. The current target prudential reserves level for the General Fund is £3.123m and the position at
financial year end is higher than this by £0.373m (the main reason for this position is due to financial
performance in 2021/22). The General Fund’s budgetary performance for the year is summarised in
the following table. The table also highlights how the in-year surplus affects the overall reserves
balance held for future use.
Page 83

Page 84

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
9
Management Commentary 
The movement of £0.008m noted above reflects the in-year movement in the General Fund balance
(i.e. opening balance 1 April 2021 of £15.028m and the closing balance as at 31 March 2022 of
£15.020m) and is further detailed within the Movement in Reserves Statement on page 40. The
following table sets out a reconciliation of the surplus on the provision of services within the
Comprehensive Income and Expenditure Statement (page 39) of £41.922m to the revenue budgetary
outturn of £0.159m. 
Original
Budget
Revised
Budget
Spend
Against
Budget Variance
£000 £000 £000 £000 £000
Total General Services Reserves Held as at 31/3/21 (15,028)
Corporate Services 32,280           32,326 31,637 (689)
Educational Services 103,682          108,906 107,693 (1,213)
Infrastructure, Regeneration and Economic Development 12,034           11,837 14,671 2,834
Housing and Communities 3,224             5,111 5,005 (106)
Health & Social Care Partnership, including Criminal Justice 74,122           76,622 76,622 0
Loan charges 6,523             6,159 6,012 (147)
Other (including one-off covid spend) 54                  12,025 12,091 66
Total Expenditure (1) 231,919          252,986 253,731 745
Council Tax (37,053) (37,053) (37,957) (904)
Revenue Support Grant/ NDR (193,854) (214,905) (214,905) 0
Use of Reserves (1,012) (1,028) (1,028) 0
Total Income (2) (231,919) (252,986) (253,890) (904)
Net Budgetary Control Position (3) = (1) + (2) (159)
Net movement in Earmarked balances 167
Movement in Reserves from 1/04/21 to 31/03/22 8
Total General Services Reserves Held as at 31/3/22 (15,020)
Net decrease in the Movement in Reserves before transfer to Statutory Reserves 2,396
Transfer from statutory reserves (2,388)
8
£000 £000
Deficit on Provision of Services in the Comprehensive Income and Expenditure
Statement 41,992
Removal of statutory adjustments not included in budget outturn (note 6):
Reversal of entries included in the surplus/ deficit on the provision of services in relation to
capital expenditure (including depreciation and impairment) (25,009)
CFCR 13,247
Pension adjustment (32,116)
Statutory repayment of debt 9,303
Transfer to other statutory reserves 302
Net gain / (loss) on sale of non current assets (998) (35,271)
Deficit on Provision of Services in Note 15 - Expenditure and Funding Analysis 6,721
Adjust for movements to/from other statutory reserves
HRA reserve (4,325)
Other reserves (2,388) (6,713)
Movement in General Fund Balance 8
Movement in earmarked sums (167) (167)
Net General Fund  budgetary control position 2021/22 (159)
Page 84

Page 85

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
10 
Management Commentary 
Housing Revenue Account (HRA) 
By law the Council maintains a separate account for the running and management of its housing
stock and had 10,378 housing units at 31 March 2022 (10,153 31 March 2021). The movement in
year is follows: 
Opening house numbers 10,153
Disposals 0
Demolitions 0
Buy back 14
New builds 211
Closing house numbers 10,378 
After the impact of earmarked balances, the account shows a deficit for the year of £4.630m. In line
with the prudential reserves policy (2% of expenditure), the target reserves level for the HRA for
2021/22 is £0.940m. Taking account of the in-year deficit (£4.630m), which is in line with the HRA
financial plan to fund some capital from revenue to reduce the cost of borrowing, the brought forward
balance from the previous year £7.364m, the balance available to the HRA for future use is £2.734m,
(earmarked reserves of £1.794m and free reserves of £0.940m). The HRA’s budget performance for
the year is summarised in the following table. The table also highlights how the in-year deficit affects
the overall reserves balance held for future use. Further information is noted on pages 103 to 105. 
Budget
Spend
Against
Budget Variance 
£000 £000 £000 £000
Total HRA Reserves Held as at 31/3/21    (7,364)
Total Expenditure 46,168 50,588 4,420 
Total Income (46,168) (50,664) (4,496) 
Net Budgetary Control Position   (76) 
Net transfer from earmarked balances   4,706 
Movement in Reserves from 1/04/21 to
31/03/22    4,630
Total HRA Reserves Held as at 31/3/22    (2,734) 
The net deficit budgetary position on the HRA Statement noted above of £4.630m compares to the
surplus noted within the HRA Income and Expenditure Statement (page 104) as detailed below: 
£000 £000
(Surplus)/Deficit for the year on HRA Services (1,229)
HRA Movement in Reserves
Adjustments to the revenue resource (13,116)
Adjustments between Revenue and Capital Resources 18,670
Transfers (to)/from Other Statutory Reserves 305 5,859
Movement in the HRA Reserve 4,630
Adjustments for earmarked funds:
Use of earmarked sums (4,706)
Net HRA budgetary control position 2021/22 (76)
HRA reserve as at 1 April 2021 (7,364)
Use of earmarked sums 4,706
Transfer of surplus to reserves (76)
HRA reserve as at 31 March 2022 (2,734)
Page 85

Page 86

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
11 
Management Commentary 
Spend relating to the net budget position of £0.076m surplus is included within note 15 (Expenditure
and Funding Analysis) on pages 76 to 79. 
Reserves 
As at 31 March 2022, the usable reserves currently held by the Council are noted below, with further
information on the future use of such reserves detailed within notes 29 and 30 on pages 97 to 101. 
An analysis of the earmarked revenue balances is shown in the chart below 
Provisions
The Council currently has no provisions held on its Balance Sheet as at 31 March 2022. 
Cash Flow Statement
The Council’s cash flow statement shows a decrease of cash and cash equivalents of £10.101m
during 2021/22 (see page 42) mainly as a result of borrowing for capital spend on non-current assets. 
General
Services HRA Total
£000 £000 £000
Unearmarked Reserve 3,496 940 4,436
Earmarked Reserve 11,524 1,794 13,318
Total Revenue Reserve 15,020 2,734 17,754
Capital Receipts Reserve 30 0 30
Capital Grants Unapplied 42 0 42
Capital Reserve 759 0 759
Other Reserves 468 0 468
Total Usable Reserves 16,319 2,734 19,053
Prudential Target 3,123 940
0 1 2 3 4 5 6 7 8
COVID
Change Fund
2022/23 Budget Commitments
Young Person's Guarantee
Other Committed Spend (<£0.1m)
HR/Legal
Historic Abuse Cases
Social Welfare Fund
Earmarked Revenue Reserves (£ Millions)
Page 86

Page 87

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
12
Management Commentary
8. COVID (Financial)
The financial analysis provided above takes into account the impact of COVID. During 2021/22
officers continued to monitor the financial impact of COVID on the Council’s revenue positon and
reported on this through budget control reports taken to Committees and full Council. £4.488m of
general COVID funding was made available in 2021/22 which was added to the £1.973m which had
been carried forward from 2020/21. 
During 2021/22 the Council exercised the Loans Fund Principal Repayment Holiday and Use of
Capital Receipts financial flexibilities approved by the UK Government and Scottish Government to
help councils respond to the financial pressures faced by local authorities as a result of the COVID
pandemic.  
The Loans Fund Principal Repayment Holiday allows the Council to take a loans fund payment
holiday in 2021/22 or 2022/23 on the condition the amount not repaid in year would by fully paid over
a 20 year period. The in-year principal payment would have been £1.673m which the Council would
have paid using in-year capital receipts and this holiday released a balance of £1.311m of capital
receipts.  Exercising the Use of Capital Receipts financial flexibility means this £1.311m can be used
to fund COVID cost pressures.
Use of COVID funds is summarised in the table below (note this excludes COVID funding made
available to the Health & Social Care Partnership):
£000 £000
2020/21 COVID Funding Carried Forward 1,972
2021/22 COVID Funding 4,488
Capital Receipts Financial Flexibility 1,311
Total Available COVID Funding in 2021/22 7,771
2021/22 COVID Spend (4,469)
Total Estimated COVID Funding to Carry Forward into
2022/23
3,302
Estimated 2022/23 COVID Expenditure (2,058)
Estimated Available COVID Funding at 31/03/23 1,244
In February 2022 the Scottish Government announced an £80m Local Authority COVID Economic
Recovery (LACER) Fund. The Council’s share of this is £1.458m. The fund is to be provided via
General Revenue Grant and Scottish Government expectations are that it will be fully utilised during
2022/23.  The Scottish Government proposed the following principles of spend to guide how the fund
should be used by local authorities:
 Interventions that support local economic recovery and contribute to businesses being able to
move from surviving the period of trading restrictions towards recovery, growth, adaptation
and building resilience.
 Projects that can rebuild consumer confidence and stimulate demand and economic activity in
their specific contexts.
 To support the low-income households that are disproportionately impacted by the pandemic
and the current cost of living crisis, to become more economically active.
This funding has not been included in the general COVID funding table above as the proposed
principles means there are restrictions on use. The following expenditure was agreed at the Council
budget meeting on 9 March 2022.
Page 87

Page 88

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
13 
Management Commentary 
2022/23 Expenditure 
£000
Four year modern apprenticeship scheme (£250k per annum) 250
Cost of Living Crisis Fund 400
Double School Clothing Grant 774
COVID Compliance Officers 101
Total 1,525 
£1.458m of this will be funded by the LACER fund with the balance of £0.067m funded from general
COVID funding. 
9. COVID (Service Delivery) 
Throughout 2021/22 COVID continued to provide unprecedented challenges for delivery of Council
services which included managing the impact of changes to national restrictions, especially as a result
of rising infection rates due to the emergence of the Omicron variant. The Council’s Strategic
Resilience Group (SRG) and the Operational Resilience Group (ORG) continue to meet to discuss the
challenges the pandemic presented to the Council with regular updates reported to Council to ensure
elected members were fully updated on the impact across all services. This included: 
Service Impact and Action Taken
Education  Continued to respond and adapt to the regularly updated Scottish
Government ‘Reducing Risks in Schools Guidance’ issuing Education
Leaders with the relevant advice and support to maintain the necessary
protective measures for operational delivery of the service.
 Continued to work with colleagues in Environmental Health and Corporate
Health and Safety to ensure enhanced and rigorous COVID Safe Protocols
and COVID Risk Assessments in place. 
 Delivered the schools and ELC’s Asymptomatic Testing Programme to
support twice weekly lateral flow testing for staff and secondary school
pupils to minimise the spread of COVID.
 Significant operational challenges faced by the service through the numbers
of positive COVID cases among staff and children and young people. Staff
showed great commitment and effort to ensuring there has been minimal
disruption to the learning for children and young people.
 Created agile and flexible working plans to offset the impact of staff or
child/young person absence which provided continuous service across all
schools and ELC’s. This was supported by remote/blended learning.
 Continued to enhance the digital technologies inclusion provision to support
remote/blended learning.
 Re-established programme of transition experiences for children and young
people entering P1 or S1.
 Provided financial and food support to families requiring most support.
 Closely monitored CO2 levels across the learning estate.
 Provided free Summer 2021 Activity Programme. 
Citizen, Culture
and Facilities
 Providing enhanced cleaning in Council premises including schools and
nurseries.
 Processing £1m of Self-Isolation Support Grants.
 Recruited additional staff to ensure capacity to engage with citizens on
issues being experienced with housing repairs due to the impact of COVID. 
Page 88

Page 89

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
14
Management Commentary
Supply,
Distribution &
Property
 With restrictions in place during the pandemic, internal works such as
housing repairs could not be undertaken, except for emergencies.  This
resulted in a significant backlog or work.  Restrictions were lifted 26 April
and an action plan was put in place to address outstanding repairs and
improve performance where possible. However, continuous high levels of
COVID related absence, together with the national skills shortage in trades,
impacted on the ability of building services to deal with the backlog as well
as newly reported repairs.
 Monitored and reported progress regularly to the Chief Executive and
elected members.
 Maintained communication with tenants through appropriate forums
including tenant groups, housing news, social media, and text messaging.
People &
Technology
 All teams continued to deliver full service to support the organisation and
maintain essential service delivery during pandemic.
 Delivered a managed ‘Return to Office’ programme designed to deliver a
safe, gradual return with appropriate restrictions maintained to protect our
employees.
 Implemented enhanced ICT security measures to better support employees
and Members working in hybrid environment and to protect the organisation.
 Actively supported the recruitment and associated contracts and payment of
over 80 COVID recovery posts and over 50 Vaccination support team posts
Housing &
Employability
 Established a number of community based facilities to allow the
Communities Team to engage with the community.
 Increased focus on homelessness prevention working with landlords and
introducing a Tenant Support Fund.
 Maintained communication with tenants through appropriate forums
including tenant groups, housing news, social media, and text messaging.
 Over the course of the pandemic delivered 316 new homes.
 Working 4U established remote community hubs from which they delivered
one-to-one and group support services and established and managed a
crisis support service which has also informed future priorities
 Implemented revised working practices to deliver services across Housing
Operations during the pandemic in line with restrictions.
 Allocated over 900 houses despite pandemic restrictions.
 Neighbourhood team and caretaking service continued to operate in
communities during the pandemic
Regulatory &
Regeneration
 Visited and provided advice to businesses to ensure they are aware of
applicable health protection guidance and that they continue to operate in a
safe manner.
 Changed to deliver services remotely including registration of deaths.
 Delivered a range of sector specific Scottish Government COVID grants
across our business community.
Resources  Continued to update their estimates of the cost of COVID to ensure Scottish
Government funding was allocated appropriately.
 Supported local communities by processing COVID hardship payments and
free school meal payments.
 Adapted interventions to meet emerging needs including allocation of funds
to foodbank support, Scottish Welfare fund top ups and additional support
for people facing housing rent and council tax pressures.
Page 89

Page 90

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
15
Management Commentary
10. Balance Sheet
The Balance Sheet on page 41 summarises the Council’s assets and liabilities as at 31 March 2022
and explanatory notes are provided. The net worth of the Council has increased by £102.967m from
£318.629m as at 31 March 2021 to £421.596m as at 31 March 2022. The major changes are set out
in the table below. 
Main Balance Sheet Changes
Pension Assets and Liabilities
The Balance Sheet on page 41 shows an assessed pension fund liability of £55.690m, using a
snapshot valuation at 31 March 2022. Further information on this is provided in note 13 on pages 71
to 76. The valuation states that assets held at the valuation date were sufficient to cover 95% of
accrued liabilities (85.6% in 2020/21). The pension scheme liability has decreased by £107.925m as
advised by the appointed actuaries, and this is mainly as a result of the downwards movement in the
assumptions of the discount rate, partially offset by future pension, and salary increase assumptions.
The appointed actuaries remain of the view that the asset holdings of Strathclyde Pension Scheme
and the contributions from employees and employers together with planned recent increases in
employers’ contributions provide sufficient security and future income to meet future pension
liabilities.
Non-Current Assets
The Council owns a number of different types of assets, as listed in the Balance Sheet. These assets
are used for ongoing and future service delivery provided by the Council to its citizens. The remit for
the Council’s Strategic Asset Management Group is to ensure the most efficient use of these assets
in pursuit of the Council’s strategic priorities. The Group manages this through ongoing review of the
overarching Strategic Asset Management Plan, which is then supported by a number of individual
Asset Management Plans (including properties, infrastructure, vehicles and equipment, etc.). 
The Council requires to assess the value of assets held based on current market conditions. In the
current year particular assets have increased in value by £5.383m. At the same time, impairment and
downward revaluations have reduced the value of other assets held by the Council by £0.804m,
resulting in a net increase in value of £4.579m. These movements adjust either the revaluation
reserve in the Balance Sheet or are included within the Net Cost of Service within the Income and
Expenditure Statement, depending on the history of the asset.
31 March 2021 31 March 2022 Change
£000 £000 £000
Long Term Assets 1,113,415 1,148,987 35,572 Increase in Property Plant and
Equipment, in line with capital
expenditure
Current Assets 87,954 79,723 (8,231) Cash and Cash Equivalents held has
decreased, partially offset by an
increase in Debtors
Current Liabilities (340,449) (352,731) (12,282) Short-term Borrowing has increased (in
line with the Treasury Strategy and
capital spend), as has Creditors
Long Term Liabilities (542,291) (454,383) 87,908 Net Pension Liability has significantly
decreased, partially offset by an
increase in Long Term Borrowing  (in line
with the Treasury Strategy and capital
spend)
Total 318,629 421,596 102,967
Main Reason
Page 90

Page 91

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
16 
Management Commentary 
Borrowing
The Council’s Treasury Strategy for 2021/22 was agreed by the Council on 22 March 2021. The
Council raised new long term loans of £35.000m (2020/21 £10.000m) and short term loans of
£315.500m (2020/21 £260.250m) and repaid naturally maturing debt of £320.748m (2020/21
£235.115m). 
The total outstanding long term debt (excluding PPP debt) as at 31 March 2022 was £307.485m
(2020/21 £284.798m) including £132.588m (2020/21 £114.006m) for the Council’s housing
stock.  The total outstanding short term debt was £270.923m (2020/21 £263.861m), including
£116.822m (2020/21 £90.362m) for the housing stock. 
The interest and expenses rate charged by the Council’s loans fund was 1.94% (2.29% in 2020/21).
Due to the current interest rates, the Council has followed a strategy to maximise the benefit in short
term borrowing to fund capital expenditure. 
Capital Finance
The Council is able to regulate its own capital spending limits within the framework recommended by
the Chartered Institute of Public Finance and Accountancy and endorsed by the Scottish Government.
The necessary treasury indicators and safeguards have been approved by Council and have resulted
in increases to both the General Services and Housing capital programmes for 2021/22 and beyond. 
The Council’s Treasury Management Strategy and Capital Strategy are approved at Council as part of
the budget setting package. Details of the capital expenditure and financing are shown in note 20 on
page 86. Total gross capital expenditure amounted to £64.219m with the split between General
Services and HRA noted in the table below. 
During 2021/22, the Council had budgeted capital expenditure of £105.054m with an actual in year
spend of £64.219m. The unspent amount (£40.835m) includes overspends, underspends and
slippage. The total slippage on planned spend was £44.883m – 42.72% (2020/21 33.72%) of the
overall capital programme which is summarised in the following table: 
The main capital projects progressed during 2021/22 were: 
General Services HRA
New Renton Campus Void Housing Strategy Programme
Posties Park Hub Building external component renewals
Clydebank Charrette Statutory compliance works
Artizan Redevelopment Targeted EESSH compliance works
Exxon City Deal Heating Improvement works
Local Economic Development and
Regeneration
Affordable Housing Supply Programme 
Actual
Budget Spend Variance Overspend Underspend Slippage
£000 £000 £000 £000 £000 £000
Service
Corporate Services 5,672 2,309 (3,363) 26 (40) (3,349)
Education 9,567 6,127 (3,440) 156 0 (3,596)
Infrastructure, Regeneration and Development 36,243 19,835 (16,408) 1,013 (43) (17,378)
Housing and Communities 89 66 (23) 0 0 (23)
Miscellaneous Services 3,502 4,241 739 739 0 0
Health and Social Care Partnership 1,653 1,041 (612) 0 0 (612)
General Services 56,726 33,619 (23,107) 1,934 (83) (24,958)
HRA 48,328 30,600 (17,728) 3,700 (1,503) (19,925)
Total 105,054 64,219 (40,835) 5,634 (1,586) (44,883)
Page 91

Page 92

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
17 
Management Commentary 
The majority of the slippage has occurred within a small number of larger capital projects and is
mainly due to the timing of starting individual projects, for various reasons, not all within Council
control, and the delayed spend on these projects moved into capital budgets for 2022/23 onwards.
The most significant slippage was experienced against the following projects: 
General Services 
District Heating Expansion Network expansion to Golden Jubilee National
Hospital will commence pending positive
commercial discussions.  
Heritage Capital Fund COVID impacted on the timescale for delivery of a
number of projects including Clydebank Town Hall,
the Clydebank Museum, and the Dalmuir Library
and Gallery. Work is now underway to get these
projects progressed. 
Vehicle Replacement  Delay due to the vehicle build time associated with
the specialist vehicles and the delivery lead time
from the date of supply order placement.
Schools Estate Improvement Plan  As a result of COVID Skills School was rephased
during 2021/22 and further costs are still expected
for Renton Campus.
HRA 
New house build Due to a number of different complexities there
were delays to getting on site across each of the
new build sites.
Projects to deliver housing strategies
(Buy Backs)
These are subject to stringent criteria to ensure
accountability and value for money for tenants and
involves several key stakeholders which resulted in
time delays
Doors/Windows  Installations are behind original planned targets due
to internal and external contractor resource issues
Building external components Resource issues has delayed the roof renewal
programme which continues into 2022/23.
Additional installations by support contractors is
underway to assist completions 
Public Private Partnership (PPP) and other Long Term Liabilities
The Council entered into a PPP for the provision of three community learning centres and a primary
school providing the Council with replacement buildings for three secondary schools which were
handed over in 2009/10 with the primary school handed over during 2011/12. In accordance with
statutory accounting guidance, full detail is provided within note 22 on pages 87 to 88. 
On 31 March 2016, the Council entered into a 25 year ‘Design, Build, Finance and Maintain’ (DBFM)
arrangement with the Scottish Government via the Scottish Futures Trust, for the provision of a further
new secondary school. The school was handed over for use by the Council during 2017/18. 
11. Group Accounts 
Local authorities are required to prepare group accounts in addition to their own Financial Statements
where they have material interest in other organisations.  The group accounts on pages 108 to 117
consolidate the Council’s Financial Statements, the Common Good and Trust Funds and six other
entities (including three further subsidiaries – West Dunbartonshire Leisure Trust, Clydebank Property
Company and West Dunbartonshire Energy LLP). The effect of combining these entities on the Group
Balances Sheet is to increase reserves and net assets by £48.600m creating an overall net asset of
£470.195m. This includes the combined pension liability of these organisations similar to that of the 
Page 92

Page 93

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
18 
Management Commentary 
Council. As there is no reason to suggest the future funding to these organisations will not continue,
the accounts have been prepared on a going concern basis. 
12. The Financial Outlook, Key Risks and the Future 
In setting the 2022/23 budget on 9 March 2022, the Council faced a number of significant financial
pressures resulting from real term reductions in government funding, inflationary pressures, in
particular utilities, service demand increases and the ongoing impact of the national economic
position.   
The 9 March 2022 Council meeting also approved the updated General Fund capital plan, the
2022/23 HRA revenue budget and the updated five year HRA capital plan. The capital plans include
funding for a number of projects over the next three years and the revenue impact of these
investments will be built into future revenue plans.   
On the 31 May 2022 the Scottish Government published its Resource Spending Review in providing
insight into strategic priorities and highlighting the scale of ongoing challenges for councils and the
wider public sector. The Resource Spending Review is high level at this time and based on ‘Level 2’
funding positions over the next four years.  ‘Level 2’ does not provide councils with their specific
allocations which would provide for more detailed financial planning however it is sufficient to provide
an overview of Scottish Government intentions. 
Early analysis of these priorities continues to reflect the prominence previously given to Health &
Social Care and Social Security spending relative to councils.  Taken together these two priority areas
account for 90% of the increase in the day-to-day spending budget from 2022/23 to 2026/27.  Whilst
the Resource Spending Review states that Council funding will remain as ‘flat cash’ (at current
2022/23 levels) until 2025/26 with a further £100m added in 2026/27, the real term impact (taking into
account inflation) of this for the next four years is a continuing erosion of core funding for councils with
a 7% reduction between 2022/23 and 2026/27. 
Following the setting of the budget in March 2022, budget projections identified expected budget gaps
of £13.761m in 2023/24 rising cumulatively to £18.622m in 2024/25. At a Council meeting on 22 June
2022 a further Financial Update was presented which adjusted these gaps to reflect the Resource
Spending Review and other changes to budget assumptions.  This resulted in amended estimated
budget gaps of £14.309m in 2023/24 rising cumulatively to £19.849m in 2024/25. 
Management of Risk 
The main financial risks identified by the Council over the medium and long term include: 
 the unknown position on future funding levels particularly given the ongoing decline in council
population, whilst the Resource Spending Review suggests there will be a flat cash settlement
for the foreseeable this is not guaranteed and still represents real term reductions in local
government funding
 any future financial implications of COVID and funding support from Scottish Government
 the impact of the ongoing implementation of Universal Credit and the potential impact of
previously implemented austerity measures on the economic strength of the West
Dunbartonshire population and business base
 changing demands and needs for council services (particularly in relation to older people)
 continued rises in inflation and interest rates which impact on the cost of service delivery and
capital programmes
 increasing costs of capital construction due to global constraints in the supply chain. 
The Annual Governance Statement, shown on pages 24 to 30, details the arrangements the Council
has put in place for the proper governance of the Council’s affairs and for the management of risk. 
Page 93

Page 94

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
19 
Management Commentary 
This Statement explains the system of internal control in place and sets out improvement actions to
the governance framework identified from the Council’s ongoing review of these arrangements. 
Risks are identified with actions to minimise and/or mitigate those risks (where possible) through the
Council’s performance monitoring system (pentana), which is reported to Members on a regular basis. 
The Future 
In recognition of the scale of the current financial challenge the Council will continue to identify service
redesign and business transformation options and these will be reported to appropriate committees
during 2022/23. Significant cost reductions have been generated through planned actions in prior
years however more work is required to deliver a balanced budget in 2023/24 and future years. 
A number of major projects continue to be progressed as follows: 
 Glasgow City Region City Deal – the Council, together with a number of other Scottish local
authorities, is participating in the Glasgow Region City Deal which will see over £1.1 billion
invested in the area. The City Deal consists of a number of significant capital projects across the
area together with employability projects – in order to generate economic regeneration and
additional jobs. The project within the City Deal specific to the Council is an infrastructure project
at the Exxon site at Bowling to regenerate that site and to create a relief road along the A82 at
Milton. The project is progressing with the full business case scheduled to be produced by June
2023. 
 Green Freeport - A Green Freeport is a large zoned area within a defined boundary which
includes a rail, sea or airport. Operators and businesses in the zone can benefit from a package
of tax and other incentives through a combination of devolved and reserved levers.Green
Freeports are designed to boost innovation and inclusive growth within communities, while
supporting Fair Work First practices, creating new green jobs, upholding the highest
environmental protections and supporting economic transformation. A Green Freeport  bid has
been submitted by the Glasgow City Region Cabinet for a multi-site bid centred around Mossend,
Glasgow Airport  for four sites in the Clyde region under single ownership within Inverclyde, West
Dunbartonshire and Glasgow City.  From a West Dunbartonshire perspective this means that
land at Scotts Yard in Bowling and Rothesay Dock in Clydebank will be included in the bid. 
 Development of Queens Quay– The Council’s investment of £15.62m in Queens Quay over the
past five years has helped fund the infrastructure needed to prepare the site for redevelopment.
In collaboration with the development partners, good progress has been made on key
developments, including the completion of the District Heating Energy Centre, new Care home,
social housing development, a partnership between Council, Wheatley Group and Clydebank
Housing Association, and the new NHS Clydebank health centre. Housing development plots are
being marketed to fulfil the ambition of delivering 1,000 new homes on Queens Quay. The
ongoing redevelopment of this site will be transformational for all our communities in Clydebank
and create stronger links with the town centre and public transport. The District Heating Energy
Centre Energy won a European Heat Pump award during 2021 and was showcased globally
during COP26. 
 Levelling Up Fund – The Levelling Up Fund is a capital fund to address systemic weaknesses
in the economies of the UK’s towns and cities. The first round of the Levelling Up Fund was
announced at the 2020 Spending Review with an aim to support communities in realising this
vision. The Council were successful, as part of round 1, in securing funds for a project requiring
up to £20m with the Dumbarton Town Regeneration project. The second round of the Levelling
Up Fund has now been announced and the Council will be submitting a bid for a large scale
transportation project. 
Page 94

Page 95

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
20 
Management Commentary  
 Shared Prosperity Fund – The UK Shared Prosperity Fund (SPF) is a part of the UK
government’s ‘Levelling Up’ agenda and was established, in part, to replace funds available
through the European Structural Funds. Lead authorities are encouraged to collaborate with their
neighbouring authorities to develop regional investment plans. West Dunbartonshire is working in
partnership with Glasgow City Region Partners. The UK Government has allocated funds to the
City Region with West Dunbartonshire share allocated by the UK Government in proportion to
the population and level of need. West Dunbartonshire has been allocated up to £3.9 million.
Local Authorities in the Glasgow City Region area have agreed to develop a regional approach to
managing the relationship with the UKSPF Team. The Regional Investment Plan has to be
finalised in August 2022 and is a pre-requisite for the release of UKSPF. While the commitment
to a regional approach and single Investment Plan has been agreed, the identification of UKSPF
priorities and therefore the targets for funding remains the preserve of each member local
authority. 
13. Other Information 
Asset Management
The Council has a significant investment embedded in assets, comprising offices, schools, vehicles,
houses, ICT infrastructure and equipment, etc. and it is important that these are managed in an
efficient and effective manner. The Council has an overarching Asset Management Strategy which
was refreshed in December 2016 along with the Property Asset Management Plan. Service specific
Asset Plans covering Open Spaces, Roads Structures, Housing and Vehicle, Fleet and Plant were all
approved at the relevant service committees during 2017. Whilst the next update was due at the end
of 2021 it was agreed this would be delayed by one year and brought back to Committee at the end of
2022 to ensure this was incorporated into the new Council Administration’s updated key strategic
priorities. In addition an updated Property and Land Disposal Strategy 2021-2026 has been approved
which seeks to maximize the benefit from Council assets which are surplus to requirement.   
Carbon Emissions and Energy Consumption 
The Council has met and exceeded its annual target set out in the Carbon Management Plan,
emitting a total of 23,635 tonnes of carbon dioxide from our operations in 2020/21.  This equates to a
3.1% reduction against the previous financial year, or a 28.3% total reduction overall against the
2012-13 baseline year.  The Council approved a new Climate change Strategy in November 2020
which has set a target to reduce WDC carbon emissions to ‘net zero’ by 2045 which will align with
Scottish Government targets. 
Equality and Diversity 
The Council is firmly committed to the principle of equality of opportunity. The Council recognises its
responsibility as a community leader, service provider and employer to encourage the fair treatment
of all individuals and to tackle social exclusion. The Council is also committed to eradicate all forms of
discrimination, direct or indirect and aims to eliminate discriminatory practices and promote measures
to combat its effects. 
Information on the Council’s Equality Outcomes and Mainstreaming Report 2021-2025 can be found
on the Council website at: 
https://www.west-dunbarton.gov.uk/council/strategies-plans-and-policies/council-wide-plans-and-
strategies/equality-diversity-and-fairness/mainstreaming-report-and-equality-outcomes/ 
Consultation and Communication with Workforce 
The Council has employee governance arrangements to ensure its employees are well informed,
involved in decisions, appropriately trained, treated fairly and consistently and provided with a safe
environment. The Council carries out regular employee engagement, and seeks the views of the
workforce through regular consultations with staff and trade unions. 
Page 95

Page 96

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
21 
Management Commentary 
14. Remuneration Report 
This report presents information on the remuneration of senior elected members and senior officers
within the Council (pages 31 to 38). 
Financial Performance Indicators
This commentary includes information on a set of financial performance indicators. These are aimed at
providing the reader with a summary of key information and are summarised in the following table: 
15. Where to find more information 
In This Publication - An explanation of the Financial Statements which follow and their purpose are
shown at the top of each page. The accounting policies and a glossary of terms can be found at the
end of this publication and these provide an explanation of the main guidelines and terms used. 
On Our Website - Further information about the Council can be obtained on the Council’s website
(West Dunbartonshire Council) or from Finance Services, 16 Church Street, Dumbarton, G82 1QL. 
2020/21
Outturn
2021/22
Target
2021/22
Outturn
Housing Performance
18.11% Percentage of current tenants owing more than 13
weeks rent, excluding those owing less than £250
Demonstrates the Council's effectiveness in
collecting local housing rents
n/a 18.94%
1,718 number of current tenants owing more than 13
weeks rent, excluding those owing less than £250
Demonstrates the Council's effectiveness in
collecting local housing rents
n/a 1,805
8.53% Current / former / total tenant arrears as a
percentage of net rent due in year
Demonstrates the Council's effectiveness in
collecting local housing rents
10.35% 9.11%
£3.621m Amount of current/ former/ total tenant rent arrears Demonstrates the Council's effectiveness in
collecting local housing rents
n/a £4.027m
100% Value of free reserves expressed as a percentage
of the prudential reserve target
Demonstrates how much free reserves the HRA
has, in comparison to the agreed minimum
100% 100%
2.00% Value of free reserves expressed as a percentage
of the net annual budget
Demonstrates the percentage of budget covered by
free reserves (2% minimum target)
2.00% 2.00%
(£0.040m) Movement in the free reserve balance Demonstrates variances contributing to the overall
free reserve position
n/a (£0.017m)
92.21% Revenue budget compared to actual outturn at year
end
Demonstrates actual spend as a percentage of the
planned budget (less than 100% indicates an
underspend)
n/a 99.99%
General Services Performance
£6.84 Cost of collecting council tax (per dwelling) Demonstrates the Council's effectiveness in
collecting local taxation
£5.00 £5.85
15.98% Council tax as a percentage of overall funding Demonstrates the amount of budget raised through
council tax
n/a 15.10%
94.18% In-year council tax collection rate Demonstrates the Council's effectiveness in
collecting local taxation
93.50% 94.53%
£35.624m Amount of income from council tax for the year that
was received
Demonstrates the Council's effectiveness in
collecting local taxation
n/a £36.485m
111% Value of free reserves expressed as a percentage
of the prudential reserve target
Demonstrates how much free reserves the GS has,
in comparison to the agreed minimum
100% 112%
2.19% Value of free reserves expressed as a percentage
of the net annual budget
Demonstrates the percentage of budget covered by
free reserves (2% minimun target)
2.00% 2.06%
£0.585m Movement in the free reserve balance Demonstrates variances contributing to the overall
free reserve position
n/a £0.159m
99.74% Revenue budget compared to actual outturn at year
end  - including top up of provisions
Demonstrates actual spend as a percentage of the
planned budget (less than 100% indicates an
underspend)
n/a 99.94%
Prudence And Affordability – Capital
4.07% Ratio of financing costs to net revenue stream
(excluding PPP) – General Services
Demonstrates how much of the General Fund
revenue budget is used to support previous capital
investment
3.63% 3.28%
23.59% Ratio of financing costs to net revenue stream –
HRA
Demonstrates how much of the HRA revenue
budget is used to support previous capital
investment
25.07% 23.55%
£646.190m Capital Financing Requirement The amount of planned capital expenditure not yet
funded
£698.886m £680.113m
£644.951m External Debt Levels (including PPP) The amount of external debt held by the Council.
Increases due to funding of the capital programme
£697.556m £670.893m
Page 96

Page 97

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
22 
Management Commentary 
16. Conclusion 
The financial results show the Council’s finances in a fairly healthy position and, considering the ongoing
significant financial pressures being faced by the Council, we have successfully managed our affairs
within the budget set and the financial objectives prescribed. This is a satisfactory outcome and reflects
well on both the efforts and professionalism of management, budget holders and on the council’s
financial management and monitoring procedures. However the Council faces a significant financial
challenge in 2023/24 and beyond due to reductions in funding, the impact of high levels of inflation and
uncertainty over the rate and funding of future local government pay awards. The Council’s Financial
Statements continue to be reported on a going concern basis. 
Acknowledgement
The production of the Annual Financial Statements is very much a team effort and we wish to record
our thanks to both Finance staff and to colleagues in all services whose efforts have contributed to the
completion of these Statements of Accounts. 
Councillor Martin Rooney  Peter Hessett    Laurence Slavin
Leader of the Council    Chief Executive   Chief Officer - Resources
Date: 30 June 2022   Date: 30 June 2022  Date: 30 June 2022 
Page 97

Page 98

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
23 
Statement of Responsibilities 
The Authority’s Responsibilities: 
The Authority is required:
 to make arrangements for the proper administration of its financial affairs and to secure that
one of its officers has the responsibility for the administration of those affairs (section 95 of
the Local Government (Scotland) Act 1973).  In this authority, that officer is the Chief Officer –
Resources;
 to manage its affairs to secure economic, efficient and effective use of resources and
safeguard its assets;
 to ensure the Annual Accounts are prepared in accordance with legislation (The Local
Authority Accounts (Scotland) Regulations 2014 and the Coronavirus (Scotland) Act 2020)
and so far as is compatible with legislation, in accordance with proper accounting practices
(Section 12 of the Local Government in Scotland Act 2003); and
 to approve the Annual Accounts for signature. 
I confirm that these Annual Accounts were authorised for issue on 30 June 2022. 
Signed on behalf of West Dunbartonshire Council 
Councillor Martin Rooney
Leader of the Council
Date: 30 June 2022 
The Chief Officer - Resources Responsibilities: 
The Chief Officer - Resources is responsible for the preparation of the Authority’s Annual Accounts in
accordance with proper practices as required by legislation and as set out in the CIPFA/LASAAC
Code of Practice on Local Authority Accounting in the United Kingdom (the Code). 
In preparing this Statement of Accounts, the Chief Officer - Resources has:
 selected suitable accounting policies and then applied them consistently;
 made judgements and estimates that were reasonable and prudent; 
 complied with legislation; and
 complied with the local authority Accounting Code (in so far as it is compatible with
legislation). 
The Chief Officer - Resources has also:
 kept adequate accounting records which were up to date; and
 taken reasonable steps for the prevention and detection of fraud and other irregularities. 
I certify that the Financial Statements give a true and fair view of the financial position of the local
authority (and its group) at the reporting date and the transactions of the local authority (and its group)
for the year ended 31 March 2022. 
Laurence Slavin
Chief Officer - Resources
Date: 30 June 2022  
Page 98

Page 99

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
24 
Annual Governance Statement 
The Annual Governance Statement explains the Council’s governance arrangements as it meets the
requirements of the “Code of Practice for Local Authority Accounting in the UK” (the Code) and
reports on the effectiveness of its system of internal control, including the reliance placed on the
governance frameworks of our partners. It is included within the Council’s Financial Statements to
assure stakeholders on how the Council directs and controls its functions and how it relates to
communities in order to enhance transparency and scrutiny of the Council’s activities. 
Scope of Responsibility
The Council is responsible for ensuring that its business is conducted in accordance with the law and
proper standards, and that public money is safeguarded and properly accounted for, and used
economically, efficiently and effectively. It also has a statutory duty to make arrangements to secure
best value under the Local Government in Scotland Act 2003. 
In discharging this overall responsibility, the Council's Elected Members and Corporate Management
Team (CMT) are responsible for putting in place proper arrangements for the governance of its affairs
and facilitating the effective exercise of its functions, which includes arrangements for the
management of risk. The Council has established an arms-length external organisation: West
Dunbartonshire Leisure Trust – to deliver leisure services more effectively on the Council’s behalf,
which reports regularly to Elected Members. From 1 July 2015 the West Dunbartonshire Health and
Social Care Partnership was established to continue the development of the integration of social care
and health services between the Council and NHS Greater Glasgow and Clyde. 
The Council has approved and adopted a Local Code of Corporate Governance (“the Local Code”),
which is consistent with the principles of the Chartered Institute of Public Finance and Accountancy
(CIPFA) and the Society of Local Authority Chief Executives (SOLACE) Framework: “Delivering Good
Governance in Local Government”. The Local Code evidences the Council's commitment to achieving
good governance and demonstrates how it complies with the governance standards recommended by
CIPFA. A copy of this Code is available from the Council website at: 
http://www.west-dunbarton.gov.uk/media/4312582/wdc-local-code.pdf 
This statement explains how the Council expects to comply with the Local Code and also meets the
Code of Practice on Local Authority Accounting in the UK, which details the requirements for the
Annual Governance Statement. 
The Purpose of the Governance Framework
The governance framework comprises: the systems and processes; and culture and values - by which
the Council is directed and controlled and through which it accounts to and engages with
communities. It enables the Council to monitor the achievement of the strategic objectives set out in
the Strategic Plan. It enables the Council to consider whether those objectives have led to the delivery
of appropriate and value for money services. 
The Council has put in place a system of internal control designed to manage risk to a reasonable
level. Internal controls cannot eliminate risk of failure to achieve policies, aims and objectives and can
therefore only provide reasonable and not absolute assurance of effectiveness. The system of internal
control is based on an ongoing process designed to identify and prioritise the risks to the achievement
of the Council's policies, aims and objectives, to evaluate the likelihood of those risks being realised
and the impact should they be realised, and to manage them efficiently, effectively and economically. 
The governance framework has been in place at the Council for the year ended 31 March 2022 and
up to the date of the approval of the Statement of Accounts. 
Page 99

Page 100

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
25 
Annual Governance Statement 
The Governance Framework
The main features of our governance arrangements are described in the Local Code but are
summarised below: 
 The overarching strategic vision and objectives of the Council are detailed in the Strategic Plan
2017/22, which sets out the key priorities of the Council and key outcomes the Council is
committed to delivering with its partners, as set out in the Local Outcome Improvement Plan;
 Services are able to demonstrate how their own activities link to the Council's vision and priorities
through their Delivery Plans. Performance management and monitoring of service delivery is
reported through service committees regularly. The CMT monitors performance information
regularly. The Council regularly publishes information about its performance;
 The West Dunbartonshire Community Alliance, which supports Community Planning West
Dunbartonshire, represents the views of community organisations, communities of interest and
geographical communities.  In addition the Council has an Engaging Communities Framework in
place which sets out our approach to engaging with citizens, community organisations and
stakeholders. Consultation on the future vision and activities of the partnership is undertaken in a
range of ways, including seeking the views of  the Alliance and through specific service
consultations and the Council actively engages with its partners through community planning
arrangements;
 The Council has adopted a Code of Conduct and associated employment policies for its
employees. Elected members adhere to the nationally prescribed Code of Conduct for Members
in a localised format. In addition, the Council has in place a protocol on member/ officer relations
and an inter-party protocol; 
 The Council operates within an established procedural framework which incorporates a Scheme
of Delegation, Standing Orders and Financial Regulations. These describe the roles and
responsibilities of Elected Members and officers and are subject to regular review. The Council
facilitates policy and decision making through the agreed committee structure;
 Responsibility for maintaining and operating an effective system of internal financial control rests
with the Council’s Chief Officer Resources as Section 95 Officer. The system of internal financial
control is based on a framework of regular management information, the Financial Regulations,
administrative procedures (including separation of duties), management and supervision, and a
system of delegation and accountability. Development and maintenance of the system is
undertaken by managers within the Council;
 The Council’s approach to risk management is set out in the Risk Management Framework. A
strategic risk register is in place and an update report on this is regularly submitted to the
Corporate Services Committee and Audit Committee. The approach is embedded within the
Council’s strategic planning and performance management framework with regular reporting of
risk management reported to service committees; and
 Comprehensive arrangements are in place to ensure Elected Members and officers are
supported by appropriate training and development.
 The Council has adopted a response that is appropriate for its fraud and corruption risks and
commits to maintain its vigilance to tackle fraud.
 The Council continues to assess and monitor ongoing compliance with the CIPFA Finance
Management Code. 
Review of Effectiveness
The Council has a responsibility to review, at least annually, the effectiveness of its governance
framework including the system of internal financial control. The review of effectiveness of the
framework is informed by the work of the CMT which has responsibility for the development,
implementation and maintenance of the governance environment, the Chief Internal Auditor’s annual
report; and reports from the external auditors and other review agencies and inspectorates. 
The Council’s current Code of Good Governance was approved at the Audit & Performance Review
Committee on 8 March 2017. An assessment of the Council’s compliance with the Code of Good 
Page 100

Page 101

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
26 
Annual Governance Statement 
Governance is supported by a process of self-assessment and assurance certification by Chief
Officers and the outcome of this assessment was reported to the Audit Committee on 15 June 2022. 
Each Chief Officer was presented with a self-assessment checklist to complete and return as
evidence of review of seven key areas of the Council’s governance framework and provided a
certificate of assurance for their service areas. 
The Audit Committee performs a scrutiny role in relation to the application of the Code of Good
Governance and regularly monitors the performance of the Council's Internal Audit service. 
In relation to the effectiveness of governance arrangements and systems of internal control for the
Council’s group entities, the Council places reliance upon the individual bodies’ management
assurances in relation to the soundness of their systems of internal control. 
The Internal Audit service operates in accordance with the Public Sector Internal Audit Standards
(PSIAS) 2017 and reports to the Audit Committee.  An annual programme of work is determined and
undertaken by Internal Audit, approved by the Audit Committee, based upon an established risk
based methodology. The Shared Service Manager – Audit & Fraud provides an independent opinion
on the adequacy and effectiveness of the Council’s System of Internal Financial Control. 
The Audit Committee performs a scrutiny role in relation to the application of PSIAS and regularly
monitors the performance of the Internal Audit service. The Council's Shared Service Manager – Audit
& Fraud (the Council’s Chief Internal Auditor) has responsibility for reviewing independently and
reporting to the Audit Committee annually, to provide assurance on the adequacy and effectiveness of
the code and the extent of compliance with it.   
It is our view that the Council has in place a sound system of internal financial control and that
appropriate mechanisms are in place to identify areas of weakness. This is corroborated by an annual
assurance statement prepared by the Shared Service Manager – Audit & Fraud stating that
reasonable assurance can be placed upon the adequacy and effectiveness of the Council's internal
control systems.  Due to the COVID-19 pandemic, some audits from 2021/22 could not be carried out
and have been rescheduled to take place in early 2022/23. However the overall audit plan is set
within the context of a multi-year approach to audit planning such that key risk areas are reviewed
over a 5 year cycle. 
The system of governance (including the system of internal control) can provide only reasonable and
not absolute assurance that the assets are safeguarded, the transactions are authorised and properly
recorded, that material errors or irregularities are either prevented or would be detected within a
timely period and that significant risks impacting on the achievement of the Council's objectives have
been mitigated. 
COVID 
The significant incident which began in late March 2020 and the Council’s responses as a Category 1
responder during the COVID pandemic continued to test how well the Council’s risk management,
governance and internal controls framework operated during 2021/22.  This was achieved using
amended governance arrangements, embracing new ways of decision-making, leadership and
implementation including virtual meetings and secure remote access to systems to allow
homeworking for Council employees as the Council moved forward through the recovery phase. 
All members of the Council’s Senior Leadership Team and key stakeholders participated in a variety
of Local Authority specific COVID /Business Continuity response groups supported by the Civil
Contingencies Service.  A comprehensive COVID Impact Risk Register was developed covering all
aspects of service delivery affected by the pandemic which was maintained throughout 2021/22.  
Page 101

Page 102

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
27 
Annual Governance Statement 
Governance Issues and Planned Actions
The following main issues and areas for improvement during 2021/22 have been identified through
the self-assessment exercise carried out by Chief Officers against key aspects of the Code of Good
Governance:
Improvement Area identified by 2021/22 Exercise Responsible Officer
Embedding Be the Best Conversations within all service
teams. 
Chief Officer, Citizen, Culture and
Facilities
Chief Officer, Supplies, Distribution
and Property
Work is required in some services to review and update
business continuity planning documentation.
Chief Officer, Housing and
Employability
Chief Officer, Resources
Business Classification Scheme will be rolled out to relevant
service areas.  
Chief Officer, People and Technology
Chief Officer, Resources
Chief Officer, Education, Learning and
Attainment
Due to ongoing COVID restrictions during 2021/22, some
services have been unable to access offices and therefore
physical access to hard copy files for destruction has not
been possible.  This will be resumed in line with easing of
restrictions.
Chief Officer, Regulatory and
Regeneration
Chief Officer, People and Technology
Appropriate and proportionate assurances will be sought
from key partners and suppliers in relation to business
continuity arrangements in place for managing key risks.
Chief Officer, Education, Learning and
Attainment
Chief Officer, People and Technology
Although improvement activity stimulated by external
inspection and internal improvement activity is monitored by
the HSCP Board and relevant Projects, it is recognised that
the HSCP would benefit from establishing arrangements to
ensure consistency in monitoring processes.
Chief Officer, HSCP
Staff training and development has been identified as an
area for improvement and resources have been identified
and agreed to ensure co-ordination of approach to training
and development across the HSCP.
Chief Officer, HSCP
An integrated workforce plan is being developed for the
HSCP for approval by the HSCP Board during 2022/23. 
Succession planning has been identified as an area for
improvement for the HSCP and work is ongoing in this
regard.
Chief Officer, HSCP
In relation to self-evaluation, work is ongoing to review
complaints and consider how all feedback can be captured
and used to inform service improvement across the HSCP.
Chief Officer, HSCP
Work is ongoing to implement the Council’s information
classification policy and procedure as part of the Microsoft
Office 365 project.
Data Protection/Information
Governance Officer
Review of Learning Disability Service to improve on ways of
working to ensure the service is fit for the future demands. 
Service Improvement lead aligned to service. Full review to
be picked up as part of renewal and recovery work.
Head of Mental Health, Addictions &
Learning Disabilities
A Project Overview document has been developed and
approved by the Integrated Housing Project Board in
relation to the IHMS. This document is being utilised to
manage all remaining Phase 2 implementation items.
Chief Officer, Housing and
Employability
At the appropriate time a post-incident review will be carried
out in relation to the COVID Pandemic highlighting any
lessons learned which will inform future emergency
response and recovery arrangements.
Chief Executive
Page 102

Page 103

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
28 
Annual Governance Statement 
The 2020/21 Annual Governance Statement highlighted a range of areas for improvement during
2021/22. The following table provides an update on progress with these with a number having been
completed or are areas which continue to have ongoing focus: 
Improvement Area identified by 2020/21 Exercise Status
Embedding Be the Best Conversations within all service
teams. 
Ongoing.  There is improvement to
be made to ensure all employees
have regular 121s
Following COVID work is required in some services to
review and update business continuity planning
documentation.
Ongoing
Business Classification Scheme will be rolled out to relevant
service areas.  
Ongoing.  This will be resumed in
line with easing of restrictions.
Due to COVID restrictions during 2020-21, some services
have been unable to access offices and therefore physical
access to hard copy files for destruction has not been
possible.  This will be resumed in line with easing of
restrictions.
Ongoing.  This will be resumed in
line with easing of restrictions
Improvement activity is ongoing within teams in order to
develop and maintain strong supervision practices.
Complete
Although the Health and Safety team undertake the co-
ordination role of Health and Safety Executive inspection
reports to ensure that action plans are put in place, there is
a need to ensure that there is regular review of action plan
progress which will be included on agendas for 121
meetings between Chief Executive and Chief Officers going
forward.
Complete
Work is ongoing to implement the Council’s information
classification policy and procedure as part of the Microsoft
Office 365 project.
Ongoing as part of the Microsoft
Office 365 rollout
Within the HSCP, work is ongoing with Healthcare
Improvement Scotland in respect of self-evaluation activity. 
Complete
Within the HSCP, continue to undertake targeted
interventions for areas with higher absence levels to support
line managers and ensure individual absences are being
managed in an appropriate manner to support return to
work.
Complete
Within the HSCP, governance processes developed for
tracking of audit action plans and ensuring action deadlines
are met will continue to be embedded.
Complete
Continue to develop plans in response to the ageing
population.  We continue to develop and review services in
response to the changing demographic.
Complete
Review of Learning Disability Service to improve on ways of
working to ensure the service is fit for the future demands. 
Service Improvement lead aligned to service. Full review to
be picked up as part of renewal and recovery work.
Ongoing
Improved case recording and assessment for children and
families who receive statutory social work services.  
Complete 
Page 103

Page 104

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
29 
Annual Governance Statement 
Improvement Area identified by 2020/21 Exercise Status
A Project Overview document has been developed and
approved by the Integrated Housing Project Board in
relation to the IHMS. This document is being utilised to
manage all remaining Phase 2 implementation items.
Ongoing
At the appropriate time a post-incident review will be
carried out in relation to the COVID-19 Pandemic
highlighting any lessons learned which will inform future
emergency response and recovery arrangements.
Ongoing 
Best Value Assurance Report
Audit Scotland reported a Best Value Assurance Report on West Dunbartonshire Council to the
Accounts Commission on 28 June 2018 which contained five recommendations, all of which are
complete.   
Health and Social Care Integration
The Council, as the funder of the Social Care services within the HSCP has an interest in the
governance arrangements within the HSCP. Internal Audit arrangements for the HSCP is provided
jointly by the Council’s Internal Audit service and the Health Board’s Internal Audit Service, with the
Council’s Internal Audit service providing audit arrangements for social care services and the general
oversight of the HSCP’s governance arrangements. 
The HSCP has arrangements in place to review its own ongoing compliance with the revised Code of
Governance. Due to the Council’s role as social care service provider Internal Audit’s process
outcomes on such services are reported to the Council’s Audit Committee as well as that of the
HSCP. The Chief Social Worker provides Council with an annual report on the performance of the
HSCP. 
The financial arrangements for the Council’s funding to the HSCP are aligned and budget processes
run parallel to ensure that appropriate budgets for the HSCP are aligned with Council policy and
budgeting approaches, particularly in relation to ensuring any efficiency targets for the HSCP funding
from the Council are planned for and appropriate efficiencies are approved by the HSCP. On an
ongoing basis Council continues to receive budgetary control information in relation to HSCP services
funded by the Council. 
Compliance with Best Practice
Statement on the role of the Chief Financial Officer in local government
The Council complies with the requirements of the CIPFA Statement on “The Role of the Chief
Financial Officer in Local Government 2010”. The Council’s Chief Financial Officer (Section 95
Officer) has overall responsibility for the Council’s financial arrangements, and is professionally
qualified and suitably experienced to lead the Council’s finance function and to direct finance staff. 
Statement on the role of the Head of Internal Audit in Public Service Organisations
The Council complies with the requirements of the CIPFA Statement on “The Role of the Head of
Internal Audit in Public Service Organisations 2019”. The Council’s Chief Internal Auditor has
responsibility for the Council’s Internal Audit function and is professionally qualified and suitably
experienced to lead and direct the Council’s Internal Audit staff. The Internal Audit service generally
operates in accordance with the CIPFA “Public Sector Internal Audit Standards 2017”. 
Page 104

Page 105

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
30 
Annual Governance Statement 
Assurance
Subject to the above, and on the basis of the assurances provided, we consider the governance and
internal control environment operating during 2021/22 provides reasonable and objective assurance
that any significant risks impacting on the achievement of our principle objectives will be identified and
actions taken to avoid or mitigate their impact. Systems are in place to continually review and improve
the governance and internal control environment with plans in place to address improvement areas. 
Martin Rooney   Peter Hessett   Laurence Slavin
Leader of the Council  Chief Executive  Chief Officer – Resources
Date: 30 June 2022  Date: 30 June 2022  Date: 30 June 2022 
Page 105

Page 106

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
31 
Remuneration Report
Introduction 
The council is required under statute to provide information on the remuneration of each senior elected
member and senior officer and any other officer not otherwise included whose remuneration is over
£0.150m per annum. All information disclosed in the tables 1-6 and section (b) of the Remuneration
Report is due to be audited by Audit Scotland. The other sections are reviewed by Audit Scotland to
ensure that they are consistent with the Financial Statements. 
a) Remuneration - Councillors 
The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004
(Remuneration) Amendment Regulations 2021 (SSI No. 2021/18). The Regulations provide for the
grading of Councillors for the purposes of remuneration arrangements, as the Leader of the Council,
the Civic Head (Provost), Senior Councillors and Councillors. The Leader of the Council and the
Provost cannot be the same person for the purposes of payment of remuneration. A Senior Councillor
is a Councillor who holds a significant position of responsibility in the Council’s political management
structure. The regulations stipulate that in addition to the Leader of the Council and the Provost, West
Dunbartonshire can appoint a maximum of ten Senior Councillors. The level of remuneration paid to
the Leader of the Council, Provost and Senior Councillors is detailed in Table 1. 
The salary that is to be paid to the Leader of the Council is set out in the Regulations. For 2021/22 the
salary for the Leader of West Dunbartonshire Council was £37,213. The Regulations also state that
the maximum yearly amount that may be paid to the Provost (£27,910) is 75% of the total yearly
amount payable to the Leader of the Council. 
The Regulations also state the remuneration that may be paid to Senior Councillors and the total
number of Senior Councillors the Council may have. The maximum yearly amount that may be paid to
a Senior Councillor (£27,910) is 75% of the total yearly amount payable to the Leader of the Council.
For 2021/22 the total yearly amount payable by the Council for remuneration of all of its Senior
Councillors shall not exceed £232,570. The Council is able to exercise local flexibility in the
determination of the precise number of Senior Councillors and their salary within these maximum
limits. Council policy is to pay Senior Councillors a salary of £23,257, per the decision at Council on
17 May 2017 for 2017/18 onwards. 
During 2021/22, the Council agreed the appointment of a Council Leader, Provost, Bailie and 8 Senior
Councillors and the remuneration due paid to the 8 Senior Councillors totalled £177,568 (£178,587 in
2020/21 for those Senior Councillors). The Regulations also permit the Council to pay contributions or
other payments as required to the Local Government Pension Scheme in respect of those Councillors
who elect to become Councillor members of the pension scheme.  The pension entitlements for the
year to 31 March 2022 are shown in Table 5 on page 36. 
The Scheme of Members Allowances which encompasses the salaries of all elected members
including the Leader, Provost, Bailie and Senior Councillors was agreed at a meeting of the full
Council on 17 May 2017. The report to Council and the Register of Members’ Expenses is available
online. 
Page 106

Page 107

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
32 
Remuneration Report 
Table 1: Remuneration of Senior Councillors 
Note: The term Senior Councillor means a Leader of the Council, the Civic Head or a Senior Councillor,
all as defined by regulation 2 of the Local Governance (Scotland) Act 2004 (Remuneration) Regulations
2007(3). 
Salaries, allowances and expenses in 2021/22 have only been included for Senior Councillors. 
Remuneration paid to all Councillors
The Council paid the following salaries, allowances and expenses to all Councillors (including the
Senior Councillors above) during the year: 
2020/21
Name Position Salary, Fees & 
Allowances
Taxable
Expenses
Non-cash
Expenses, 
Benefits-in
kind
Total
Remuneration
Total
Remuneration
£ £ £ £ £
Leader of Council 37,213 0 0 37,213 35,713
Convener of Recruitment &
Individual Performance
Management Committee
Convener of Sub Committee on
Scheme of Delegation
William Hendrie Provost 27,910 0 0 27,910 26,785
Depute Provost  
Depute Leader
Convener of Appeals Committee
Convener of Educational Services
Committee
Caroline McAllister Depute Leader (to 29/3/2021) 18,644 0 0 18,644 22,275
Denis Agnew Bailie 23,257 0 0 23,257 22,320
Convener of West Dunbartonshire
Health & Social Care  Partnership
(IJB)
Convener of Cultural Committee
Ian Dickson Convener of Corporate Services
Committee
23,254 0 0 23,254 22,338
Convener of Tendering Committee
Convener of Licensing Board
Diane Docherty Convener of Housing &
Communities Committee
23,254 0 0 23,254 22,338
Convener of Licensing Committee
Convener of Planning Committee
Iain Mclaren Convener of Infrastructure
Regeneration & Economic
Development Committee
23,254 0 0 23,254 22,338
Marie McNair Convener of West Dunbartonshire
Health & Social Care  Partnership
(IJB) (to 1 June 2021)
19,394 0 0 19,394 22,320
John Mooney Convener of Audit Committee 23,257 0 0 23,257 22,320
Year ended 31 March 2022
22,320
Jonathan McColl
Karen Conaghan 23,254 0 0 23,254 22,338
Jim Finn 23,257 0 0 23,257
2020/21 2021/22
£ £
459,853 Salaries 470,582
2,083 Expenses 4,020
461,936 Total 474,602
Page 107

Page 108

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
33 
Remuneration Report 
b)  Remuneration - Senior Employees and Senior Employees of Subsidiaries 
Note: The annual return of Councillors’ salaries and expenses for 2021/22 is available for any
member of the public to view at all Council libraries and public offices during normal working hours
and is also available on the Council website at  https://www.west-
dunbarton.gov.uk/council/councillors-and-committees/councillors-allowances/ 
The salary of senior employees is set by reference to national arrangements. The Scottish Joint
Negotiating Committee (SJNC) for Local Authority Services sets the salaries for the Chief Executives
of Scottish local authorities. Circular CO/151 sets the amount of salary for the Chief Officials of the
Council for the period 1 April 2021 to 31 March 2022. The post of Chief Officer Health and Social
Care Partnership is a joint post between the Council and NHS Greater Glasgow and Clyde. The post
of Chief Officer Roads & Neighbourhood is a joint post between the Council and Inverclyde Council. 
The only benefits received by employees are: salary; employer contributions to the pension fund; and
where applicable, payment for election duties.  There were no bonuses, compensation for loss of
office or other benefits paid to senior employees during the year. The remuneration details for senior
employees are noted in Table 2: 
Election payments for 2021/22 are for the Scottish Parliamentary Election held on the 6 May 2021.
There were no elections during 2020/21. 
Details of the post of Chief Officer-Health & Social Care Partnership are included in the remuneration
report of the Integration Joint Board. The Council funds 50% of this post and NHS Greater Glasgow
fund the remaining 50%. 
Details of the post of Chief Officer - Roads & Neighbourhood (shared post with Inverclyde Council)
are included in the remuneration report of Inverclyde Council. The Council funds 50% of this post
which was £60,897 (including employer on costs).
Name Position at 31/03/22
Salary, Fees &
Allowances
2021/22
Election
Duties     
2021/22
Total
Remuneration
2021/22
Total Remuneration
2020/21
£ £ £ £
Remuneration of Senior Employees
Joyce White Chief Executive 133,472 8,815 142,287 133,398
115,158
Jonathan Hinds Head of Children’s Healthcare & Criminal
Justice - Chief Social Work Officer (to 29
August 2021)
37,598 (FYE
88,165)
0 37,598 (FYE
88,165)
88,190
Lesley James Head of Children’s Healthcare & Criminal
Justice - Chief Social Work Officer (from 6
Dec 2021)
27,411 (FYE
88,322)
0 27,411 (FYE
88,322)
0
Laura Mason Chief Officer - Education, Learning &
Attainment
96,399 0 96,399 89,645
Stephen West Chief Officer - Resources - S95 Officer (to 3
Jan 2022)
73,912 (FYE
95,872)
0 73,912 (FYE
95,872)
93,588
Laurence Slavin Chief Officer - Resources - S95 Officer (from
3 Jan 2022)
22,357 (FYE
92,817)
0 22,357 (FYE
92,817)
0
Peter Hessett Chief Officer - Regulatory & Regeneration 96,804 5,498 102,302 91,062
Victoria Rogers Chief Officer - People & Technology 96,804 350 97,154 91,062
Angela Wilson Chief Officer - Supply, Distribution & Property 115,070 0 115,070 115,158
Peter Barry Chief Officer - Housing & Employability 96,804 0 96,804 91,062
Malcolm Bennie Chief Officer - Citizen, Culture & Facilities (to
2 Jan 2022)
71,292 (FYE
95,872)
140 71432 (FYE
96,012)
89,534
Amanda Graham Chief Officer - Citizen, Culture & Facilities
(from 5 Jan 2022)
74,340 (FYE
92,817)
380 74,720 (FYE
93,197)
0
Remuneration of Senior Employees of Subsidairies
John Anderson General Manager of West Dunbartonshire
Leisure
77,780 0 77,780 76,912
Richard Cairns Strategic Director of Regeneration,
Environment & Growth (seconded role from
1/10/2020)
115,070115,070 0
Page 108

Page 109

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
34 
Remuneration Report 
The amounts for post of Strategic Director of Regeneration, Environment & Growth relate to the
salary, fees and allowances and employer pension contributions paid by the Council. Glasgow City
Council fund 75% of the salary and pension contributions for the seconded role.
Notes
1. The term senior employee means any local authority employee:
 who has responsibility for the management of the local authority to the extent that the
person has the power to direct or control the major activities of the authority (including
activities involving the expenditure of money), during the year to which the Report
relates, whether solely or collectively with other persons;
 who holds a post that is politically restricted by reason of section 2(1) (a), (b) or (c) of
Local Government and Housing Act 1989 (4);  or
 whose annual remuneration, including any remuneration from a local authority subsidiary
body, is £150,000 or more. 
2. The figure for gross salary, fees and allowances shown for senior employees for the year
ended 31 March 2022 includes any amounts received for the roles performed for West
Dunbartonshire in the elections. There was one election during 2021/22 (Scottish
Parliamentary Election). There was no elections during 2020/21.
3. The Local Government (Discretionary Payments and Injury Benefits)(Scotland) Regulations
1998 make provision for authorities to make discretionary payments to local government
employees to pay compensation for premature retirement.  There were no discretionary
payments made to senior employees during the year. 
c) Remuneration of Employees receiving more than £50,000 
Council employees receiving more than £50,000 remuneration for the year were paid the
following amounts. In accordance with the disclosure requirement of the Regulations, the
information in the table shows the number of employees in bands of £5,000. This information
includes the senior employees who are subject to the fuller disclosure requirements in the tables
above. 
Table 3: Remuneration of Employees 
2021/22 2020/21
£50,000 -   £54,999 128 140
£55,000 -   £59,999 46 43
£60,000 -   £64,999 28 22
£65,000 -   £69,999 48 52
£70,000 -   £74,999 10 3
£80,000 -   £84,999 1 2
£85,000 -   £89,999 4 6
£90,000 -   £94,999 0 7
£95,000 -   £99,999 5 0
£100,000 - £104,999 1 0
£115,000 - £119,999 3 3
£130,000 - £134,999 0 1
£140,000 - £144,999 1 0
Total 275 279
Number of Employees
Page 109

Page 110

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
35 
Remuneration Report 
d) Pension Benefits
Pension benefits for Councillors and most local government employees are provided through the
Local Government Pension Scheme (LGPS).  Councillors’ pension benefits are based on career
average pay. The Councillor’s pay for each year or part year ending 31 March (other than the pay in
the final year commencing 1 April) is increased by the increase in the cost of living, as measured by
the appropriate index (or indices) between the end of that year and the last day of the month in which
their membership of the scheme ends. The total of the revalued pay is then divided by the period of
membership to calculate the career average pay. This is the value used to calculate the pension
benefits. The pension entitlements for the year to 31 March 2022 are shown in Table 5 on pages 36. 
The table details the pension entitlement and contributions made by the Council in respect of all
senior Councillors and senior officers of the Council who have opted to join the LGPS.   
For local government employees, the LGPS 2015 is a career average pension scheme. This means
that pension benefits from 01/04/2015 are based on pensionable pay with inflation added. Pension is
accrued at a rate of 1/49 of pensionable pay for each scheme year. Pension benefits can be accessed
from age 55 but are reduced prior to 60th birthday. Pension benefits accrued before 1 April 2015 are
protected and are based on final pay on retiring. 
Pension benefits for teachers are provided through Scottish Teachers Superannuation Scheme
(STSS).The STSS is a contributory scheme administered by the Scottish Public Pension Agency
(SPPA). From 1 April 2015 the scheme is a career average pension scheme. Pension benefits are
increased in line with inflation. Pension is accrued at 1/57 of pensionable earnings each year. Pension
benefits can be accessed earlier than the normal state pension age but will be reduced if taken earlier
than the normal pension age (state pension age).
From 1 April 2009, a five tier contribution system was introduced with contributions from scheme
members being based on how much pay falls into each tier. This is designed to give more equality
between the cost and benefits of scheme membership. Table 4 provides information on these tiered
contribution rates. 
Table 4: Contribution Rate 
Contribution
rate 2021/22
Contribution
rate 2020/21
The tiers and members contribution rates for 2021/22 whole time pay:
Local Government employees
On earnings up to and including £22,300 (£22,200) 5.50% 5.50%
On earnings above £22,300 (£22,200) and up to £27,300 (£27,100) 7.25% 7.25%
On earnings above £27,300 (£27,100) and up to £37,400 (£37,200) 8.50% 8.50%
On earnings above £37,400 (£37,200) and up to £49,900 (£49,600) 9.50% 9.50%
On earnings above £49,900 (£49,600) 12.00% 12.00%
The tiers and members contribution rates for 2021/22 actual pay:
Teachers
On earnings up to and including £ 28,309 (£28,168) 7.20% 7.20%
On earnings above £28,309 (£28,168)and up to £37,918 (£37,918) 8.70% 8.70%
On earnings above £ 38,801 (£37,918)  and up to £45,186 (£44,961) 9.70% 9.70%
On earnings above £45,186 (£44,961)  and up to £ 59,884 (£59,586) 10.40% 10.40%
On earnings above £ 59,844 (£59,586)  and up to £81,659 (£81,253) 11.50% 11.50%
On earnings above £81,659 (£81,253) 11.90% 11.90%
Page 110

Page 111

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
36 
Remuneration Report 
If a person works part-time their contribution rate is worked out on the whole-time pay rate for the job,
with actual contributions paid on actual pay earned. There is no automatic entitlement to a lump sum.
Members may opt to give up (commute) pension for lump sum up to the limit set by the Finance Act
2004. The accrual rate guarantees a pension based on 1/49th of pay from 1 April 2015. Prior to this
the accrual rate guarantees a pension based on 1/60th of final pensionable salary and years of
pensionable service. Prior to 2009 the accrual rate guaranteed a pension based on 1/80th and a lump
sum based on 3/80th of final pensionable salary and years of pensionable service. 
The value of the accrued benefits has been calculated on the basis of the age at which the person will
first become entitled to receive a pension on retirement without reduction on account of its payment at
that age; without exercising any option to commute pension entitlement into a lump sum; and without
any adjustment for the effects of future inflation. You can retire and receive your benefits in full from
your normal pension age. The normal pension age is 65 for any benefits built up before 1 April 2015.
For pension build up from 1 April 2015, the Normal Pension Age is not fixed at age 65 but, instead, is
the same as the State Pension Age (but with a minimum of age 65).
Table 5: Pension Benefits of Senior Councillors; Senior Employees and Senior Employees of
Subsidiaries 
Name Position at 31/03/22 For year to
31 March
2022
For year to
31 March
2021
As at 31
March
2022
As at 31
March
2021
£ £ £ £
Jonathan McColl Leader of Council 7,182 6,893 9,927 8,643
Convener of Sub Committee on Scheme of Delegation
Convener of Recruitment & Individual Performance Management
Committee
Denis Agnew Bailie 4,489 4,308 8,303 7,324
Convener of West Dunbartonshire Health & Social Care
Partnership (IJB)
Convener of Cultural Committee
John Mooney Convener of Audit Committee 4,489 4,308 4,445 3,867
Karen Conaghan Depute Provost 4,480 4,298 2,268 1,785
Depute leader 
Convener of Appeals Committee
Convener of Educational Services Committee
Ian Dickson Convener of Corporate Services Committee 4,480 4,298 2,268 1,785
Convener of Tendering Committee
Convener of Licensing Board
Diane Docherty Convener of Housing & Communities Committee 4,480 4,298 2,268 1,785
Convener of Licensing Committee 4,489 4,308 5,002 4,357
Convener of Planning Committee
Caroline McAllister Depute Leader (to 29/3/2021) 3,570 4,298 2,173 1,785
Iain McLaren Convener of Infrastructure Regeneration & Economic
Development Committee
4,480 4,298 2,268 1,785
Senior Employees
Joyce White Chief Executive 27,404 25,667 40,989 38,005
Richard Cairns Strategic Director of Regeneration, Environment & Growth
(seconded role from 1/10/2020)
24,037 22,157 72,805 70,397
Jonathan Hinds Head of Children’s Healthcare & Criminal Justice - Chief Social
Work Officer (to 29 Aug 2021)
6,853 16,970 60,925 60,163
Lesley James Head of Children’s Healthcare & Criminal Justice - Chief Social
Work Officer (from 6 Dec 2021)
5,431 0 592 0
Laura Mason Chief Officer - Education, Learning & Attainment 18,605 17,302 137,027 135,105
Stephen West Chief Officer - Resources - S95 Officer (to 3 Jan 2022) 14,065 18,009 131,249 127,902
Laurence Slavin Chief Officer - Resources - S95 Officer (from 3 Jan 2022) 4,466 0 473 0
Peter Hessett Chief Officer - Regulatory & Regeneration 18,646 17,535 98,687 94,312
Victoria Rogers Chief Officer - People & Technology 18,646 17,535 72,996 69,349
Angela Wilson Chief Officer-Supply,Distrubtion & Property 22,157 22,157 161,987 159,556
Peter Barry Chief Officer - Housing & Employability 18,646 17,535 60,535 57,241
Malcolm Bennie Chief Officer - Citizen, Culture & Facilities (to 2 Jan 2022) 13,751 17,263 18,992 17,502
Amanda Graham Chief Officer - Citizen, Culture & Facilities (from 5 Jan 2022) 14,357 0 10,103 0
Senior Employees of Subsidiaries
John Anderson General Manager of West Dunbartonshire Leisure 14,979 14,799 59,796 57,718
In-year pension
contributions
Accrued pension
benefits
Senior Councillors
Jim Finn
Page 111

Page 112

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
37
Remuneration Report
The pension figures shown relate to the benefits that the person has accrued as a consequence of
their total public sector service, and not just their current appointment. The pension entitlements for
the year to 31 March 2022 for Senior Councillors are shown in Table 5, together with the contribution
made by the Council to each Senior Councillor’s pension during the year. Senior councillors omitted
from the table above are not members of the Local Government Pension Scheme.
e) Exit Packages
There were no exit packages agreed during 2021/22.
f) Trade Union Facility Time
Facility time generates benefits for employees, managers and the wider community from effective
joint working between union representatives and employers.
Details of the facility time within West Dunbartonshire Council during the year to 31 March 2022 is
shown in Table 7 below. Further detail can be found at:
https://www.west-dunbarton.gov.uk/council/performance-and-spending/trade-union-facility-time-
reports/
Table 7
Banding
2021/22 2020/21 2021/22 2020/21
£ £
£0  -  £20,000 0 4 0 8,033
£20,001  - £40,000 0 2 0 57,403
£60,001 - £150,000 0 0 0 0
Total 0 6 0 383,381
Total cost
Number of
departures
Number of Employees FTE employee Number Number of Employees
FTE employee
Number
37 31 56 52
Percentage Number of Employees Percentage Number of
Employees
Less < 1% 27 Less < 1% 37
1-50% 9 1-50% 17
51%-99% 1 51%-99% 0
100% 0 100% 2
Percentage of Pay Bill Spent on Facility Time Percentage of Pay Bill Spent on facility
1.17% 22.00%
0.17% 0.06%
Paid TU Activities Paid TU Activities
£97,862 £97,973
Total pay bill Total pay bill
£58,699,980 £158,326,164
Education Function Employee All Other Function Employee
Percentage of Time Spent on Facility Percentage of Time Spent on Facility
Total cost of facility time Total cost of facility time
Page 112

Page 113

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
38 
Remuneration Report 
Martin Rooney        Peter Hessett
Leader of the Council       Chief Executive
Date: 30 June 2022       Date: 30 June 2022 
Page 113

Page 114

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
39
Comprehensive Income and Expenditure Statement
This statement shows the accounting cost in year, of providing services in accordance with relevant
International Financial Reporting Standards, rather than the amount to be funded from taxation.  The
Council raises taxation to cover expenditure in accordance with regulations; this may be different from
the accounting cost.  The taxation position is shown in the Movement in Reserves Statement.
Further detail on the expenditure and income within the Net Cost of Services below is available in
Note 15 on pages 76 to 80.
2020/21 2020/21 2020/21 2021/22 2021/22 2021/22
Gross Gross Net Gross Gross Net
Expenditure Income Expenditure Expenditure Income Expenditure
£000 £000 £000 Note £000 £000 £000
Service
67,986 (42,105) 25,881 Corporate Services 71,197 (38,346) 32,851
116,612 (17,593) 99,019 Educational Services 125,602 (15,424) 110,178
67,809 (17,814) 49,995 Infrastructure, Regeneration and Economic
Development
65,015 (16,032) 48,983
37,083 (32,922) 4,161 Housing and Communities 39,631 (31,853) 7,778
34,003 (43,354) (9,351) Housing Revenue Account 38,661 (44,675) (6,014)
8,597 (6,117) 2,480 Miscellaneous Services 7,021 (8,501) (1,480)
177,261 (101,678) 75,583 Health and Social Care Partnership 192,224 (107,720) 84,504
2,339 0 2,339 Requisitions 2,517 0 2,517
511,690 (261,583) 250,107 Net Cost of Service (1) 541,868 (262,551) 279,317
883 (Gain) / loss on Disposal of Fixed Assets 998
883 Other Operating Expenditure (2) 998
(36,765) Council Tax (38,207)
(55,963) 10 Non-Domestic Rates (81,408)
(153,086) 10 Revenue Support Grant (133,404)
(26,210) 10 Recognised Capital Income (Grants, Contributions & Donations) (7,746)
(272,024) Taxation and Non-specific Grant Income (3) (260,765)
(165) 27 Interest Earned (81)
19,180 27 External Interest Payable / Similar Charges 17,865
1,382 Impairment Loss - Debtors 1,101
0 27 (Gain)/Loss early settlement of borrowing 0
3,379 13 Pension Interest Cost/Expected Return on Pension Assets 3,557
23,776 Finance/Investment Income and Expenditure (4) 22,442
2,742 (Surplus)/Deficit on Provision of Services (5) = (1)+(2)+(3)+(4) 41,992
(49,393) (Surplus)/Deficit arising from revaluation of property, plant and equipment (4,917)
0 (Surplus)/Deficit on revaluation of available for sale assets 0
12,934 13 Actuarial (gains)/losses on pension fund assets and liabilities (140,041)
(36,459) Other Comprehensive (Income) and Expenditure (6) (144,958)
(33,717) Total Comprehensive (Income) and Expenditure (5) + (6) (102,966)
Page 114

Page 115

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
40 
Movement in Reserves Statement 
This statement shows the movement in the year on the different reserves held by the Council, analysed into ‘usable reserves’ (i.e. those that can be applied to
fund expenditure or reduce local taxation) and other reserves.  The surplus or (deficit) on the provision of services line in the Comprehensive Income and
Expenditure Statement (page 39) shows the true economic cost of providing the Council’s services. These are different from the statutory amounts required to be
charged to the General Fund balance and the Housing Revenue Account for council tax setting and dwelling rent setting purposes.  The net increase/decrease
before transfer to other statutory reserves line shows the statutory general fund balance and housing revenue account balance before any discretionary transfers
to or from earmarked reserves undertaken by the Council. 
General
Fund
balance
HRA
Balance
Capital
Receipts
Reserve
Capital
Grants and
Receipts
Unapplied
Account
Capital
Reserve
Capital
Fund
Other
Reserves
Total
Usable
Reserves
Unusable
Reserves
Total
Reserves
Note £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
2021/22
Opening Balance at 1 April 2021 (15,028) (7,364) 0 (42) (1,469) 0 (308) (24,211) (294,418) (318,629)
Movement in reserve 2021/22
Total Comprehensive Expenditure and Income 43,221 (1,229) 0 0 0 0 0 41,992 (144,958) (102,966)
Adjustments between accounting basis and funding basis under regulations 6 (40,825) 5,554 (30) (1,837) 0 (403) 0 (37,541) 37,541 0
Net (Increase)/Decrease before Transfers to Other Statutory Reserves 2,396 4,325 (30) (1,837) 0 (403) 0 4,451 (107,417) (102,966)
Transfers to/from other statutory reserves (2,388) 305 0 1,837 711 403 (160) 708 (708) 0
Closing Balance at 31 March 2022 (15,020) (2,734) (30) (42) (758) 0 (468) (19,052) (402,543) (421,595)
2020/21
Opening Balance at 1 April 2020 (9,395) (3,924) 0 (132) (2,169) 0 (214) (15,834) (269,078) (284,912)
Movement in reserve 2020/21
Total Comprehensive Expenditure and Income 11,039 (8,297) 0 0 0 0 0 2,742 (36,459) (33,717)
Adjustments between accounting basis and funding basis under regulations 6 (15,280) 4,504 0 (279) 0 (916) 0 (11,971) 11,971 0
Net (Increase)/Decrease before Transfers to Other Statutory Reserves (4,241) (3,793) 0 (279) 0 (916) 0 (9,229) (24,488) (33,717)
Transfers to/from other statutory reserves (1,392) 353 0 369 700 916 (94) 852 (852) 0
Closing Balance at 31 March 2021 (15,028) (7,364) 0 (42) (1,469) 0 (308) (24,211) (294,418) (318,629)
Usable Reserves
Page 115

Page 116

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
41 
Balance Sheet
The balance sheet shows the value, as at the balance sheet date, of the assets and liabilities
recognised by the Council. The net assets of the Council (assets less liabilities) are matched by the
reserves held by the Council. Reserves are reported in two categories:   
1. Usable reserves, i.e. those reserves that the Council may use to provide services, subject to the
need to maintain a prudent level of reserves and any statutory limitations on their use (for
example the capital receipts reserve that may only be used to fund capital expenditure or repay
debt); and
2. Unusable reserves, i.e. those that the Council is not able to use to provide services.  This category
of reserves includes reserves that hold unrealised gains and losses (for example the revaluation
reserve), where amounts would only become available to provide services if the assets are sold;
and reserves that hold timing differences shown in the MIRS line ‘adjustments between accounting
basis and funding basis under regulations’. 
The unaudited Financial Statements were authorised for issue on 30 June 2022. 
Laurence Slavin
Chief Officer - Resources
West Dunbartonshire Council
Date: 30 June 2022
2020/21 2021/22
£000 Note £000
1,111,227 16 Property, Plant and Equipment 1,146,365
271 17 Intangible Assets 631
22 Long Term Debtors 21
1,406 19 Heritage Assets 1,485
489 Long Term Investments 485
1,113,415 Long Term Assets 1,148,987
7,755 18 Asset Held for Sale 5,117
1,338 Inventories 1,279
66,620 23 Short Term Debtors 71,187
12,241 26 Cash and Cash Equivalents (net) 2,140
87,954 Current Assets 79,723
(53) Donated Inventories (76)
(72,858) 28 Short Term Creditors (78,362)
(263,861) 27 Short Term Borrowing (270,923)
(3,677) 22 PPP (3,370)
(340,449) Current Liabilities (352,731)
860,920 875,979
(284,798) 27 Long Term Borrowing (307,485)
(92,615) 22 PPP and Finance Lease Liabilities (89,115)
(163,615) 13 Net Pensions Liability (55,690)
(1,263) 10 Capital Grants Receipts in Advance (2,093)
(542,291) Long Term Liabilities (454,383)
318,629 Net Assets 421,596
Represented by:
24,211 MIR/30 Usable Reserves 19,053
294,418 MIR/31 Unusable Reserves 402,543
318,629 Total Reserves 421,596
Page 116

Page 117

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
42 
Cash Flow Statement 
The cash flow statement shows the changes in cash and cash equivalents of the Council during the
reporting period.  The statement shows how the Council generates and uses cash and cash
equivalents by classifying cash flows as operating, investing and financing activities.  The amount of
net cash flows arising from operating activities is a key indicator of the extent to which the operations
of the Council are funded by way of taxation and grant income or from the recipients of services
provided by the Council.  Investing activities represent the extent to which cash outflows have been
made for resources which are intended to contribute to the Council’s future service delivery.  Cash
flows arising from financing activities are useful in predicting claims on future cash flows by providers
of capital (i.e. borrowing) to the Council. 
2020/21 2021/22 2021/22
£000 £000 £000
Operating Activities
2,742 Net deficit on the provision of services 41,992
(39,121) Depreciation, amortisation and impairment (32,756)
(884) Net gain/loss on fixed assets (1,006)
(16,604) Movement in pension liabilities (32,116)
54 Movement in inventories (82)
21,536 Movement in debtors 6,915
(25,795) Movement in creditors and provisions (9,567)
351 Other non-cash movements 272
(60,463)
Adjustments to net deficit on the provision of services for non-cash
movements (68,340)
6 Financing movements 15
26,210 Investing movements 7,746
26,216
Adjustments for items included in the net surplus/deficit on the provision
of services that are investing and financing activities 7,761
(31,505) Net cash inflow from Operating Activities (18,587)
88,866 Purchase of property, plant and equipment and intangible assets 66,341
(1,284) Proceeds from sale of property, plant and equipment and intangible assets (2,262)
(6) Movement on long term investments (4)
(17,810) Other receipts from investing activities (10,037)
69,766 Net cash outflows from investing activities 54,038
(270,250) Cash receipts of short-term and long-term borrowing (350,501)
3,652 Repayment of PPP liabilities 3,808
235,115 Repayment of short-term and long-term borrowing 320,751
42 Debtors held for agency payments (888)
(2,023) Creditors held for agency payments 1,480
(33,464) Financing Activities (25,350)
4,797 10,101
17,038 Cash and cash equivalents at the beginning of the reporting period 12,241
12,241 Cash and cash equivalents at the end of the reporting period 2,140
4,797 Movement – (Increase)/ Decrease in Cash 10,101
Page 117

Page 118

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
43
Notes to the Financial Statements
Note 1 - Accounting Policies
1. General Principles
The Financial Statements summarises the Council’s transactions for the 2021/22 financial year and its
position at the year end of 31 March 2022. The Council is required to prepare an Annual Statement of
Accounts by the Local Authority Accounts (Scotland) Regulations 2014. Section 12 of the Local
Government in Scotland Act 2003 requires they be prepared in accordance with proper accounting
practices. These practices primarily comprise the Code of Practice on Local Authority Accounting in
the United Kingdom 2021/22 (“the code”) and the Service Reporting Code of Practice 2021/22,
supported by International Financial Reporting Standards (IFRS).
The accounting convention adopted in the Financial Statements is principally historic cost, modified
by the revaluation of certain categories of non-current assets and financial instruments. The
convention also adopts the assumption that the Council will continue as a going concern for the
foreseeable future.
2. Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when payment is made or received.
In particular:
 revenue from sale of goods is recognised when the Council transfers the significant risks and
rewards of ownership to the purchaser and when it is probable that the economic benefits
associated with the transaction will flow to the Council;
 revenue from the provision of services is recognised when the Council can measure reliably the
percentage of completion of the transaction and when it is probable that the economic benefits
associated with the transaction will flow to the Council;
 expenses in relation to services received are recorded as expenditure when the services are
received, rather than when payment is made;
 supplies are recorded as expenditure when they are consumed.  Where there is a gap between
the date supplies are received and their consumption their value is carried as inventories on the
Balance Sheet;
 interest payable on borrowings and receivable on investments is accounted for on the basis of
the effective interest rate for the relevant financial instrument, rather than on cash flows fixed or
determined by the contract;
 where income and expenditure have been recognised but cash has not been received or paid, a
debtor or creditor for the relevant amount is recorded in the Balance Sheet. Where there is
evidence that debts are unlikely to be settled, the balance of debtors is written down and charged
to revenue for the income that might not be collected; and
 Revenue from contracts with service recipients, whether for services or the provision of goods, is
recognised when (or as) the goods or services are transferred to the service recipient in
accordance with the performance obligations in the contract.
3. Changes in Accounting Policies, Estimates and Errors
Changes in accounting policies are only made when required by proper accounting practices or the
change provides more reliable or relevant information about the effect of transactions, events or
conditions on the Council’s financial position or performance. Where a change is made, it is applied
retrospectively by adjusting opening balances and comparative figures, as if the new policy has
always been applied.
Changes in accounting estimates are accounted for prospectively, i.e. in the current and future years
only.
Material errors discovered in prior period figures are corrected retrospectively by amending opening
balances and comparative figures.
Page 118

Page 119

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
44 
Notes to the Financial Statements 
4. Charges to Revenue for Property, Plant and Equipment 
Council Services are debited/ credited with the following amounts to record the cost of using or
holding fixed assets during the year: 
 depreciation, attributable to the assets used by the relevant service or trading account;
 revaluation and impairment losses, where there is no accumulated gain in the Revaluation
Reserve; 
 revaluation gains, where these reverse an impairment loss previously charged to the service or
trading account; and
 amortisation of intangible fixed assets. 
The Council is not required to raise council tax to cover depreciation, revaluation gains or losses or
impairment losses. However, it is required to make annual provision from revenue towards the
reduction in its overall borrowing requirement.  Depreciation, revaluation and impairment losses and
amortisations are replaced by the revenue provision in the General Fund by an adjustment within the
Capital Adjustment Account in the Movement in Reserves Statement for the difference between the
two. 
5. Intangible assets 
Internally generated assets are capitalised where it is demonstrable that the project is technically
feasible and is intended to be completed (with adequate resources being available) and the Council
will be able to generate future economic benefits or deliver service potential by being able to sell or
use the asset.  Expenditure is capitalised where it can be measured reliably as attributable to the
asset and restricted to that incurred during the development phase (research expenditure is not
capitalised). 
Expenditure on the development of websites is not capitalised if the website is solely or primarily
intended to promote or advertise the Council’s goods or services. 
Assets are measured originally at cost and only revalued where the fair value of the asset can be
determined by reference to an active market. 
Where an intangible asset has a finite useful life, the depreciable amount of the asset is charged over
its useful life to the relevant service line(s) in the Comprehensive Income and Expenditure Statement. 
An asset is tested for impairment whenever there is an indication that the asset might be impaired –
any losses recognised are posted to the relevant service line(s) in the Comprehensive Income and
Expenditure Statement.  Any gain or loss arising on the disposal or abandonment of an intangible
asset is recognised in the Surplus or Deficit on the Provision of Services when the asset is
derecognised. 
6. Property, Plant and Equipment 
Assets that have physical substance and are held for the supply of goods and services, either directly
or indirectly, and that are expected to be used during more than one financial year are classified as
Property, Plant and Equipment. 
Recognition 
Expenditure on the acquisition, creation or enhancement of property, plant and equipment is
capitalised on an accruals basis, provided that it is probable that the future economic benefits or
service potential associated with the item will flow to the Council and the cost of the asset can be
measured reliably.  Expenditure that maintains, but does not add to the asset’s potential to deliver
future economic benefits or service potential, is charged as an expense when it is incurred. 
Page 119

Page 120

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
45 
Notes to the Financial Statements 
Measurement 
Initially measured at cost, comprising of: 
 purchase price (the Council has no de minimis level set);
 any costs associated with bringing the asset to the location or condition necessary for it to be
capable of operating in the manner intended by management; and
 the initial estimate of costs for dismantling and removing the item and restoring the site on which
it is located to its original state. 
The Council does not capitalise borrowing costs incurred during construction of an asset. 
Where property, plant or equipment are acquired in exchange for a non monetary asset or assets, or a
combination of monetary and non monetary assets, the cost of the acquired item shall be measured at
fair value unless there is no economic substance to the exchange transaction, or the fair value of neither
the asset received nor the asset given up can be reliably measured.  The acquired item is measured at
fair value even if the Council cannot immediately derecognise the asset given up.  The acquired item is
measured at the carrying amount of the asset given up if it is not measured at fair value. 
Assets are then carried in the Balance Sheet using the following measurement bases: 
Asset Type Valuation Method
Infrastructure, community and assets
under construction assets
Historic Cost
Council dwellings Fair value - determined in accordance with
existing use value of social housing (EUV-SH) 
Other buildings Fair value.  Where there is no market based
evidence of fair value because of the specialised
nature of the asset and the asset is rarely sold,
depreciated replacement cost is used as an
estimate of fair value 
Plant and equipment and other non
property assets
Fair value.  Where assets in this class have either
short useful lives or low values (or both),
depreciated historical cost is considered to be a
proxy for fair value where the useful life is a
realistic reflection of the life of the asset and the
depreciation method provides a realistic reflection
of the consumption of the asset class 
Revaluation 
Assets included in the Balance Sheet at fair value are re-valued regularly to ensure their carrying
amount is not materially different from the fair value at the year end, as a minimum every five years. 
The programme of revaluation for 2021/22 and planned each of the following four years is as follows: 
2021/22 Offices / depots/ cemeteries/ crematorium lodges;
2022/23 All Council non-operational properties/ HRA housing stock; 
2023/24 Schools/school houses/ social work homes/adult training centres/
community education centres/early education centres; 
2024/25 Halls/ Public conveniences/ libraries/ outdoor centres/ golf course/
pavilions/ sports centres/ swimming pools/ travellers site/ car parks/ HRA
housing stock; and
2025/26 Any properties not previously re-valued / general re-appraisal / HRA
housing stock. 
Page 120

Page 121

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
46 
Notes to the Financial Statements
In addition to assets being revalued within the programme of revaluation assets will be revalued in
any given year if any of following three criteria is met:
 When the historic cost of the building is less than £2m but the combined value of the building
historic cost and any enhancement expenditure incurred since the last revaluation date
exceeds £2m then the asset will be revalued and (if new valuations exceeds £2m)
componentised if necessary; 
 Where the historic cost of the building exceeds £2m (and is therefore already componentised)
and where any enhancement expenditure incurred since the last revaluation date exceeds
25% of the historic cost of the building then the asset will be revalued; and
 Where the combined value of building historic cost and any enhancement expenditure
incurred since the last revaluation date spend is less than £2m but the value of the
enhancement expenditure exceeds 50% of building historic cost and in value is more than
£0.500m then the asset will be revalued.
Valuations in 2021/22 have been carried out by an external valuer. Valuations of land and buildings
are carried out in accordance with the methodologies and bases for estimation set out in the
professional standards of the Royal Institution of Chartered Surveyors.
Increases in valuations are matched by credits to the Revaluation Reserve to recognise unrealised
gains. 
Where decreases in value are identified, the revaluation loss is accounted by: 
 where a balance of revaluation gains for the asset is held in the Revaluation Reserve – the
carrying amount of the asset is written down against that balance (up to the total gain); or
 where no balance of revaluation gains for the asset is held in the Revaluation Reserve – the
carrying amount is written down against the relevant service line(s) in the Comprehensive
Income and Expenditure Statement. 
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007, the date of its
formal implementation. Gains arising before that date have been consolidated into the Capital
Adjustment Account. 
Impairment 
Where impairment losses are identified, they are accounted for in the same way as revaluation
decreases. 
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service
line(s) in the Comprehensive Income and Expenditure Statement, up to the amount of the original
loss, adjusted for depreciation that would have been charged if the loss had not been recognised. 
Disposals 
When it becomes apparent that the carrying amount of an asset will be recovered principally through
a sale transaction rather than through its continuing use, it is re-classed as either a surplus asset or
an Asset Held for Sale.  The asset is re-valued immediately before re-classification and then carried
at the lower of this amount and the fair value less sale costs.   
Assets to be scrapped are not re-classified as Assets Held for Sale. 
When an asset is disposed of or decommissioned, both the carrying amount in the Balance Sheet and
receipts from disposal are transferred to the Surplus and Deficit on the Provision of Services line in
the Comprehensive Income and Expenditure Statement as part of a gain or loss on sale.  Any
revaluation gains accumulated for the asset in the Revaluation reserve are transferred to the Capital
Adjustment Account. 
Page 121

Page 122

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
47 
Notes to the Financial Statements 
Amounts received for a disposal are categorised as capital receipts. The balance of receipts is
credited to either the Capital Receipts Reserve or the Capital Fund and can only be used for new
capital investment, set aside to reduce the Council’s underlying borrowing requirement, to fund the
principal element of loan charges or to fund premium charges. Receipts are appropriated to these
reserves from the General Fund balance in the Movement in Reserves Statement. 
The written-off value of disposals is not a charge against council tax. It is appropriated to the Capital
Adjustment Account from the General Fund balance in the Movement in Reserves Statement. 
Depreciation 
Depreciation is provided on all property, plant and equipment over their useful economic lives, with an
exception made for assets without a determinable finite useful life (i.e. non depreciating land and
certain community assets) and assets that are not yet available for use (i.e. assets under
construction). The useful lives of assets and depreciation method are as follows: 
Council Dwellings 10 – 80 years Straight line
Other buildings 15 – 80 years Straight line
Open spaces 10 – 120 years Straight line
Infrastructure 15 – 120 years Straight line
Vehicles, plant, equipment 5 – 20 years Straight line
Intangibles 5 – 10 years Straight line
Other 10 – 120 years Straight line
* Including components such as structure, mechanical and electrical, etc. 
Where an item of property, plant and equipment assets has major components whose cost is
significant in relation to the total cost of the item, the components are depreciated separately. 
Revaluation gains are also depreciated, with an amount equal to the difference between current
depreciation charged on assets and the depreciation that would be chargeable based upon historic
cost being transferred each year from the Revaluation Reserve to the Capital Adjustment Account. 
Tangible fixed assets and depreciation – Common Good Assets
All assets valued over £6,000 are capitalised and valued at market value. Depreciation is charged on
assets other than Investment assets on a straight line basis over their estimates life. The Fund only
holds investment assets. 
7. Assets Held for Sale 
These assets are measured at fair value, based on the amount at which the asset could be
exchanged between knowledgeable parties at arm’s length, less costs to sell at the initial
classification and at the end of each reporting date. Revaluation gains shall be recognised for any
initial or subsequent increase in fair value less costs to sell but not in excess of the cumulative
impairment loss or revaluation loss that have been recognised in the Surplus of Deficit on the
Provision of Services.  Impairment losses (or revaluation losses) will be recognised for any 
subsequent decrease to fair value less costs to sell following reclassification in the Surplus or Deficit
on the Provision of Service even where there is a balance on the assets Revaluation Reserve. 
8.  Heritage Assets 
Heritage assets are presented separately in the balance sheet from other property, plant and
equipment.  The assets are measured at historic cost or fair value.  Where the Council considers that
it is not practical to obtain a reliable valuation, the asset is not recognised on the Balance Sheet. 
Where assets are measured at fair value, valuations are made by any method that is appropriate: 
Page 122

Page 123

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
48 
Notes to the Financial Statements 
Type of Asset Valuation Method for Balance Sheet Purposes
Ship models/ Silver and
Commemorative wear 
The last formal valuations were by Bonhams, Sotheby’s
and Phillips. Further formal valuations will be
commissioned where it is considered that there could
potentially be a material change in value and where the
value of the asset is estimated to be in excess of £10,000
Works of art  The last formal valuations were by Bonhams, Sotheby’s
and Phillips. Where a lower and upper valuation has been
provided the mid valuation has been used 
Further formal valuations will be commissioned where it is
considered that there could potentially be a material
change in the value of the assets held
Civic Regalia The robes are not recognised on the balance sheet as they
are considered to have no significant value.  However the
chains are reported in the balance sheet at insurance
value.
Sewing Machine Collection These collections are not recognised on the balance sheet
as cost information is not readily available.  Nearly all the
items are believed to have an immaterial value.
Listed Buildings and Scheduled
Ancient Monuments
These assets are not recognised on the balance sheet as
it is considered that there is a lack of available,
comparable market values to establish a ‘fair value’.  
It is unlikely that the Council would procure such assets
but is more likely to refurbish or enhance existing
structures.  In this respect, the cost of those works will be
capitalised at cost. 
Purchased assets are initially recognised at cost and donations are recognised at valuation where
that value is estimated to be greater than the threshold of £10,000 as specified above. The carrying
amounts are reviewed where there is evidence of impairment e.g. where an item has suffered
physical deterioration or breakage or where doubts arise as to its authenticity.  Any impairment is
recognised and measured in accordance with the Council’s general policies on impairment. 
No depreciation shall be chargeable on any heritage asset, in view of the indeterminate life and
residual value. 
The proceeds from any disposal of heritage assets are accounted for in accordance with the council’s
general provisions relating to the disposal of property, plant and equipment.   
Work in progress is valued at cost plus an appropriate proportion of overheads, together with
attributable profits and allowances for foreseeable losses. 
10. Employee Benefits 
Benefits payable during employment 
Short term employee benefits (i.e. fall due within 12 months of the year-end), such as wages and
salaries, paid leave, paid sick leave, bonuses and non monetary benefits for current employees are
recognised as an expense in the year in which the employees render service to the Council. An
accrual is made against the services in the Surplus or Deficit on the Provision of Service for the costs
of holiday entitlement and other forms of leave earned by the employee but not taken before the year
end and which employees can carry forward into the next financial year. Any accrual made is required
under statute to be reversed out of the General Fund balance by a credit to the Statutory Mitigation
Account in the Movement in Reserves Statement. 
Page 123

Page 124

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
49
Notes to the Financial Statements
Termination Benefits
Termination benefits are amounts payable as a result of a decision made by the Council to terminate
an officer’s employment before the normal retirement date or an officer’s decision to accept a
voluntary termination package in exchange for those benefits.  Termination benefits do not provide
the Council with future economic benefits and consequently they are recognised on an accruals basis
immediately in the Surplus or Deficit on the Provision of Services line in the Comprehensive Income
and Expenditure Account when the Council is demonstrably committed to provision of the termination
benefits.
Where termination benefits involve the enhancement of pensions, they are treated as pension costs
for the purpose of the statutory transfer between the Pension Reserve and the General Fund of the
amount by which the pension costs calculated in accordance with the Code are different from the
contributions due under the pension scheme regulations.  In the Movement in Reserves Statement
appropriations are required to and from the Pension Reserve to remove notional debits and credits for
termination benefits related to pensions enhancements and replace them with the cost of the cash
paid, including any amounts due and not paid at the year end.
Post Employment Benefits
Employees of the Council are members of two separate defined pension schemes:
 the Teachers’ Pension Scheme, administered by the Scottish Pensions Agency; and
 the Local Government Pensions Scheme, administered by Glasgow City Council.
In relation to retirement benefits, statutory provisions require the General Fund to be charged with the
amount payable by the Council to the pension fund or directly to pensioners in the year, not the
amount calculated in accordance to the relevant accounting standards.  In the Movement in Reserves
Statement this means that there are appropriations to and from the Pension Reserve to remove any
notional debits and credits for retirement benefits and replace them with the cash paid or payable at
the year end, to the pension fund and pensioners.  The negative balance that arises on the Pension
Reserve measures the beneficial impact on the General Fund of being required to account for
retirement benefits on the basis of cash flows rather than as benefits earned by employees.
Discretionary Benefits
The Council has restricted powers to make discretionary awards of retirement benefits in the event of
early retirements. Any liabilities estimated to arise as a result of an award to any member of staff
(including teachers) arising from the use of these discretionary powers are accrued in the year of the
decision to make the award and accounted for using the same policies as are applied to the local
government pension scheme.
11. Events after the Reporting Period
Events after the reporting period are those events (both favourable and unfavourable) that occur
between the end of the reporting period and the date when the Financial Statements are authorised
for issue.  Two types have been identified:
 those that provide evidence of conditions that existed at the end of the reporting period – the
Financial Statements are adjusted to reflect this; and
 those that are indicative of conditions that arose after the reporting period – the Financial
Statements are not adjusted to reflect this.  However, if the event is material, a disclosure is made
within the notes of the nature and financial effect.
Page 124

Page 125

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
50
Notes to the Financial Statements
12. Exceptional Items
When items of income and expenditure are material, their nature and amount is disclosed separately,
either within the Comprehensive Income and Expenditure Statement or in the notes to the accounts,
depending on how significant the items are to the understanding of the Council’s financial
performance. 
13. Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when the Council becomes party to the
contractual provisions of a financial instrument and initially measured at fair value and carried at their
amortised cost. Annual charges to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement for interest payable are based upon the carrying
amount of the liability, multiplied by the effective rate of interest for the instrument. The effective
interest rate is the rate that exactly discounts estimated future cash payments over the life of the
instrument to the amount at which it was originally recognised.
For most of the borrowing that the Council has this means that the amount presented in the Balance
Sheet is the outstanding principal repayable (plus accrued interest).  Interest charged to the
Comprehensive Income and Expenditure Statement is the amount payable for the year according to
the loan agreement.
Gains and losses on the repurchase or early settlement of borrowing are credited or debited to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and
Expenditure Statement in the year of repurchase/settlement.  However, where repurchase has taken
place as part of a restructuring of the loan portfolio that involves the modification or exchange of
existing instruments, the premium or discount is respectively deducted from or added to the amortised
cost of the new or modified loan and the write-down to the Comprehensive Income and Expenditure
Statement is spread over the life of the loan by an adjustment to the effective interest rate.
Where premiums and discounts have been charged to the Comprehensive Income and Expenditure
Statement regulations allow the impact on the General Fund balance to be spread over future years. 
Premiums and discounts that were on the balance sheet as at 31 March 2007 are written off in
accordance with the schedules in place at that time, however premiums and discounts that are
incurred as a result of transactions that have taken place since 1 April 2007 are written off in
accordance with regulations as follows:
Modified Loans
 both old and new premiums and discounts are amortised over the life of the new loan using the
effective interest rate as noted above.
Unmodified Loans
 new premiums and discounts are written off over the life of the new loan (if fixed) or over a
maximum of 20 years (if variable or with an option to vary);
 old premiums are written off over a maximum of 20 years; and
 old discounts are written off over a maximum of 5 years.
Straight Repayment
 both old and new premiums and discounts are written off over a maximum of 5 years.
14. Financial Assets
Financial assets are classified using a principles based approach with the accounting treatment being
determined by both the particular characteristics of the individual instrument and the overarching
investment strategy under which the instrument has been acquired or originated.  Three classes of
financial asset have been identified:
Page 125

Page 126

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
51 
Notes to the Financial Statements 
 amortised cost;
 fair value through other comprehensive income; and
 fair value through profit or loss 
Amortised Cost
For assets carried at amortised cost interest is credited (using the effective interest rate) and
movements in impairment loss allowances are debited or credited to surplus or deficit on the provision
of services with no recognition of gains or losses in fair value until reclassification or derecognition of
the asset. 
Fair Value Through Other Comprehensive Income
For assets carried at fair value through other comprehensive income movements in amortised cost
are debited or credited to the surplus or deficit on the provision of services with movements in fair
value debited or credited to other comprehensive income and expenditure. 
Fair Value Through Profit or Loss
For assets carried at fair value through profit or loss all gains or losses are posted to surplus or deficit
on the provision of services as they arise. 
Financial assets are classified into two types: 
 loans and receivables – assets that have fixed or determinable payments but are not quoted in
an active market; and
 available-for-sale assets – assets that have a quoted market price and/or do not have fixed or
determinable payments 
Loans and Receivables 
Loans and receivables are recognised on the Balance Sheet when the Council becomes party to the
contractual provisions of a financial instrument and initially measured at fair value.   
They are then measured at their amortised cost.  Annual credits to the Financing and Investment
Income and Expenditure line in the Comprehensive Income and Expenditure Statement for interest
receivable are based on the carrying amount of the asset multiplied by the effective rate of interest for
the instrument. Where considered material movements in impairment loss allowances are also
debited or credited as appropriate. For most other the loans that the Council has made, this means
that the amount presented in the Balance Sheet is the outstanding principal receivable (plus accrued
interest) and interest credited to the Comprehensive Income and Expenditure Statement is the
amount receivable for the year in the loan agreement. 
Where soft loans are made and are material, a loss is recorded in the Comprehensive Income and
Expenditure Statement (debited to the appropriate service line) for the present value of the interest
that will be foregone over the life of the loan, resulting in a lower amortised cost than the outstanding
principal.  Interest is credited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement at a marginally higher effective rate of interest
than the rate receivable from the community groups, with the difference increasing the amortised cost
of the loan in the Balance Sheet.  Statutory provisions require that the impact of soft loans on the
General Fund balance is the interest receivable for the financial year – the reconciliation of amounts
debited or credited to the Comprehensive Income and Expenditure Statement to the net gain required
against the General Fund balance is managed by a transfer to or from the Financial Instruments
Adjustment Account in the Movement in Reserves Statement. 
Instruments Entered Into Since 1 April 2006 
Any financial guarantees the Council has committed to since 1 April 2006 have been recognised at
fair value and assessed for probability of the guarantee being called and the likely amount payable
under the guarantee. Any material provision for this has been recognised in the Financial Statements
to the extent that provisions might be required or a contingent liability note is needed. 
Page 126

Page 127

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
52 
Notes to the Financial Statements 
15. Fair Value Measurement 
The Council measures some on its non-financial assets and some of its financial instruments at fair
value at each reporting date. Fair value is the price that would be received to sell an asset or paid to
transfer a liability in an orderly transaction between market participants at the measurement date. 
The fair value measurement assumes that the transaction to sell the asset takes place either: 
 in the principal market for the asset or liability; or
 in the absence of a principal market, in the most advantageous market for the asset 
The Council measures the fair value of an asset or liability using the assumptions that market
participants would use when pricing the asset, assuming that market participants act in their economic
best interest. 
When measuring fair value of a non-financial asset, the Council takes into account a market
participant’s ability to generate economic benefit by using the asset in its highest and best use or by
selling it to another market participant that would use the asset in its highest and best use. 
The authority uses valuation techniques that are appropriate in the circumstances and for which
sufficient data is available, maximising the use of relevant observable inputs and minimising the use
of unobservable inputs. 
Inputs to the valuation techniques in respect of assets for which fair value is measured or disclosed in
the Council’s financial statements are categorised within the fair value hierarchy as follows: 
 Level 1 – quoted prices (unadjusted) in active markets for identical assets or liabilities that the
authority can access at the measurement date;
 Level 2 – inputs other than quoted prices included within Level 1 that are observable for the
asset or liability, either directly or indirectly; and
 Level 3 – unobservable inputs for the asset or liability. 
16. Government Grants and Contributions 
Government grants and other contributions are recognised as due by the Council when there is
reasonable assurance that:
 the Council will comply with the conditions attached to the payments, and
 the grants or contributions will be received. 
Amounts recognised as due to the Council are not credited to the Comprehensive Income and
Expenditure Account until conditions attached to the grant or contribution have been satisfied. 
Conditions are stipulations that specify that the future economic benefits or service potential
embodied in the asset acquired using the grant or contribution are required to be consumed by the
recipient as specified for future economic benefit or service potential must be returned to the
transferor. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried
in the Balance Sheet as creditors. When conditions are satisfied, the grant or contribution is credited
to the relevant service line (attributable revenue grants/contributions) or Taxation and Non Specific
Grant Income (non ringfenced revenue grants and all capital grants) in the Comprehensive Income
and Expenditure Statement. 
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are
reversed out of the General Fund balance in the Movement in Reserves Statement.  Where the grant
has not yet been used to finance capital expenditure, it is posted to the Capital Grants Unapplied
Account. Where it has been applied, it is posted to the Capital Adjustment Account.  Amounts in the
Capital Grants Unapplied Account are transferred to the Capital Adjustment Account once they have
been applied. 
Page 127

Page 128

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
53
Notes to the Financial Statements
17. Inventories
Inventories are held by a number of Council services, such as asset maintenance services, roads,
services, school technician services, hospitality services, etc., and include consumable stock and
work in progress, where appropriate.
Consumable stock is included in the Balance Sheet on a cost price basis, with inventory quantities
based on physical stock at the end of the year.
18. Leases
Leases are classified as finance leases where the terms transfer substantially all the risks and
rewards incidental to ownership from the lessor to the lessee. All other leases are classified as
operational. Where the lease covers both land and buildings, the elements are considered separately
for classification.
Council as Lessee
Finance Leases
Assets held under finance lease are recognised in the Balance Sheet at the start of the lease at its fair
value at the lease’s inception, or, if lower the present value of the minimum lease payments. The
asset recognised is matched by a liability for the obligation to pay. Initial direct costs are added to the
carrying amount of the asset. Premiums paid on entry into a lease are applied to writing down the
lease liability. Contingent rents are charged to revenue in the years they incur. Lease payments are
apportioned between:
 a charge for the acquisition of the interest in the asset – applied to write down the lease liability;
and
 a finance charge (debited to the Financing and Investment income and Expenditure line in
Comprehensive Income and Expenditure Statement).
Assets recognised under the finance lease are accounted for using the policies applied generally to
council owned assets, subject to depreciation being charged over the lease term if this is shorter than
the asset’s estimated useful life. 
Operating Leases
Rentals paid under operating leases are charged to the Comprehensive Income and Expenditure
Statement as an expense. Charges are made on a straight line basis over the life of the lease, even if
it does not match the pattern of payment.
Council as Lessor
Finance Leases
When the Council grants a finance lease over an asset, the asset is written out of the Balance Sheet
as a disposal.  At the start of the lease the carrying amount of the asset is written off to the Other
Operating Expenditure line in the Comprehensive Income and Expenditure Statement as part of the
gain/loss on disposal. A gain, representing the Council’s net investment in the lease is credited to the
same line in the Comprehensive Income and Expenditure Statement, matched by a lease asset in the
Balance Sheet. Lease rentals receivable are apportioned between:
 a receipt for the acquisition of the interest in the asset – applied to write down the lease asset
(together with any premiums received); and
 finance income (credited to the Financing and Investment income and Expenditure line in
Comprehensive Income and Expenditure Statement).
Page 128

Page 129

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
54 
Notes to the Financial Statements 
The gain credited to the Comprehensive Income and Expenditure Statement on disposal is not
permitted by statute to increase the General Fund balance and will be required to be treated as a
capital receipt.  Where a premium has been received, this is posted out of the General Fund Balance
to the Capital Receipts Reserve in the Movement in Reserves Statement.  Where the amounts due in
relation to the lease asset is to be settled by the payment of rentals in future financial years, this is
posted out of the General Fund Balance to the Deferred Capital Receipts Reserve in the Movement in
Reserves Statement.  When the future rentals are paid, the element of the charge for the acquisition 
of the interest in the asset is used to write down the lease asset.  At this point, the deferred capital
receipts are transferred to the Capital Receipts Reserve. 
The written off value of the disposals is not a charge against council tax, as the cost of fixed assets is
fully provided for under separate arrangements for capital financing.  Amounts are appropriated to the
Capital Adjustment Account from the General Fund balance in the Movement in Reserves Statement. 
Operating Leases 
Where the council grants an operating lease over an asset, the asset is retained in the Balance
Sheet. Rental income is credited to the Other Operating Expenditure line in the Comprehensive
Income and Expenditure Statement. Credits are made on a straight line basis over the life of the
lease, even if it doesn’t match the pattern of payment. 
19. Overhead and Support Services 
The costs of overheads and support services are charged to non General Fund services that benefit
from the supply in accordance with the costing principles of the CIPFA Service Reporting Code of
Practice 2021/22.  The total absorption costing principle is used – the full cost of overheads and
support services are shared between those users in proportion to the benefits received. General Fund
Services have not been charged for these support service costs, in line with the Council’s budgetary
reporting structure. 
20. Public Private Partnership (PPP) and Similar Contracts 
PPP and similar contracts are agreements to receive services, where the responsibility for making
available the property, plant and equipment needed to provide the services passes to the private
contractor. As the Council is deemed to control the services that are provided under the PPP scheme
and as ownership of the property, plant and equipment will pass to the council at the end of the
contract for no additional charge, the Council carries the asset on its Balance Sheet. 
21. Provisions 
Provisions are made where an event has taken place that gives the Council a legal obligation or
constructive obligation that probably requires settlement by a transfer of economic benefits or service
potential and a reliable estimate can be made of the amount of that obligation. 
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income
and Expenditure Statement in the year the Council becomes aware of the obligation and measured at
the best estimate at the Balance Sheet date, taking account of relevant risks and uncertainties. 
When payments are made they are charged to the provision carried in the Balance Sheet. Estimated
settlements are reviewed at the end of each financial year. Where it becomes less probable that a
transfer of economic benefits is required; the provision is reversed and credited back to the relevant
service. 
Page 129

Page 130

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
55 
Notes to the Financial Statements 
22. Impairment of Debt 
Any changes to the impairment value of debt is charged to the appropriate line in the Comprehensive
Income and Expenditure Statement. This includes impairment of outstanding Council Tax, Non
Domestic Rates, Rent and other sundry debt. To calculate the level of impairment required
consideration is given to the type of debt, the age of debt, arrangements for repayment by the debtor,
historic movement of the debt. 
23. Interest in Companies and Other Entities 
The council has material interests in companies and other entities that have the nature of associates/
subsidiaries and require it to prepare group accounts.  In the Council’s own single entity accounts, the
interests of two companies are recorded as an investment in the Balance Sheet, as the council has
shares and full ownership of the Clydebank Property Company (purchased during 2014/15) and has
an investment with Hub West Scotland (invested 2015/16). No other interests are recorded in the
council’s single entity accounts of any of other organisation. 
24. VAT 
VAT payable is included as an expense only to the extent that it is not recoverable from HM Revenue
and Customs. VAT receivable is excluded from income. 
25. Loans Advances Repayment 
In accordance with The Local Authority (Capital Finance and Accounting) (Scotland) Regulations
2016, the Council has recalculated the repayments of the loans fund advances to reflect the life of the
specific assets associated with the debt, using an annuity of 9%. 
Note 2 – Critical Judgement in Applying Accounting Policies 
The preparation of the consolidated financial statements requires management to make some
judgements and assumptions when applying the accounting policies that have the most significant
effect on carrying amounts in the financial statements. These judgements are usually about complex
transaction or involve uncertainty about future events. Where a critical judgement has been made,
this is referred to in the relevant note to the core financial statements; however a summary of those
with the most significant effect are detailed below: 
Public Private Partnership (PPP) and Design-Build-Finance-Maintain (DBFM) - The Council has
entered into a PPP contract for the provision of three secondary schools and one primary school. The
Council has also entered into a DBFM contract for one secondary school. The contracts include the
build of the schools as well as their maintenance and provision of related facilities over the period of
each contract.  After consideration of International Financial Reporting Interpretations Committee
IFRIC12 (Service Concession Arrangements), it has been concluded that these are service
concession arrangements and the Council controls the services provided under the scheme and
ownership of the schools will pass to the Council at the end of the contracts for no additional charge.  
The assets used to provide services at the schools are recognised on the Council’s Balance Sheet as
operational assets and as a finance lease liabilitiy. The value of these assets (£104m) is included
within the Property, Plant and Equipment (note 16) and the liability within note 22 - Private Finance
Initiatives and similar Contracts (£92m).
Public Sector Funding – There is a high degree of uncertainty about future levels of funding for local
government. The Council has a Longer Term Financial Strategy, updated and reported to Council
annually, which provides a list of current assumptions over a 10 year period regarding funding.
However, the Council has determined that this uncertainty is not yet sufficient to provide an indication
that the assets held might require to be impaired as a result of a need to close facilities and reduce
levels of service provision. 
Page 130

Page 131

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
56 
Notes to the Financial Statements 
Council Acting as Principal or Agent - When the Council receives funding it requires to consider
the degree of control it has over how this funding is to be utilised. If the Council has no discretion over
the utilisation of the funds it deems that it is acting as an agent and this funding is reported in the
Agency Services note and not reflected in the Council’s income and expenditure, but with any
amounts owed to/ from the Council held within its Balance Sheet. In 2021/22 funding was provided by
the Scottish Government through the Council to businesses and individuals affected by the COVID
pandemic. Any agency funding is noted within Note 9 (Agency Services), with further detail of COVID
related grants shown and cross referred in Note 10 (Grant Income). 
Provision or Contingent Liability - Where the Council faces a future liability and this can be
quantified with a reasonable degree of certainty, a provision for that liability is made. If the liability can
not be quantified, it will be disclosed as a Contingent Liability (Note 31). Most of these involve ongoing
or prospective legal action meaning the outcome and potential amounts involved can not be
determined with any level of accuracy. 
Note 3 – Assumptions Made About the Future and Other Major Sources of Estimation
Uncertainty 
The Financial Statements contain estimated figures that are based on assumptions about the future
or that are otherwise uncertain.  Estimates are made taking into account historical experience, current
trends and other relevant factors.  However, because balances cannot be determined with certainty,
actual results could be materially different from the assumptions and estimates.  The items in the
Council’s balance sheet as at 31 March 2022, for which there is a significant risk of material
adjustment in the forthcoming financial year are noted below. Examples are provided of each potential
uncertainty and the effect it would have within the Financial Statement are also noted. These
examples provide an understanding of the significance of a small change in the estimation
assumption: 
Estimation assumptions which impact within the next 12 months:
Item Uncertainty Potential effect 
Property
Plant and
Equipment –
valuation
The Council’s assets are valued on a
rolling programme over a maximum of 5
years. The valuation assumptions are
ascertained by the professional valuers
used by the Council.
The Council’s valuers considered
uncertainty regarding the valuation of
assets following COVID and have
concluded that the valuations are not
subject to ‘material valuation uncertainty’
due to the current economic climate as at
the valuation date. 
If the actual results differ from the
assumptions, the value of the assets could
be affected.
The value of the assets subject to
revaluation over the rolling programme is
£918.586m. 
During 2021/22 the assets that were
revalued are now held in the Balance Sheet
to a total value of £29.326m for General
Services and £425m for HRA
The impact for each 1% change in these
valuations would be £0.293m General
Services and £4.250m HRA within the
Balance Sheet, resulting in an increase or a
decrease to the Revaluation Reserve, or an
impairment charge, but with no effect on the
General Fund or the HRA reserves.
Any change would also impact on annual
depreciation charges.
Page 131

Page 132

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
57 
Notes to the Financial Statements
Item Uncertainty Potential effect 
Property
Plant and
Equipment
–
depreciation
/ useful lives
Assets are depreciated over useful lives
that are dependent on assumptions
about the level of repairs and
maintenance that will incur in relation to
those assets. The current economic
climate makes it uncertain that the
Council will be able to sustain its current
level of spending on maintenance,
bringing into doubt the useful lives
assigned to assets.
If the useful lives of assets were too high, it
is estimated that the annual depreciation
charge for buildings would increase by
£1.625m for every year that useful lives had
to be reduced, resulting in a further charge
to that value through the Comprehensive
Income and Expenditure Statement and the
value of the assets held in the Council’s
Balance Sheet would also be reduced by
the same value. Any change would not
affect the reserves position of the Council.
Arrears and
bad debts
As at 31 March 2022, the Council had a
balance of various debtors of £71.187m
with a sliding scale of bad debt provision
written against each type, depending on
the age of the debt. For example of the
council tax debt of £42.907m, the
Council holds £25.334m as a provision
for doubtful debts; of the debt held for
HRA rents of £4.027m, £2.444m is held
as a provision for doubtful debts.
If collection rates were to deteriorate, the
provision for bad debts would require to be
reviewed to consider the appropriate level
of provision. 
If a 10% increase was considered
appropriate, this would result in a further
£2.533m being required to be provided for
council tax provision and £0.244m for an
HRA rent provision. Any change in the
provision would affect the reserves position
of the Council.
However, based upon prior experience, in
year movements and with each type of debt
considered individually, the bad debt
provision is considered adequate.
Fair Value
Measureme
-nt 
When the fair value of financial assets
and financial liabilities cannot be
measured based on quoted prices in
active markets (i.e. Level 1 inputs), their
fair value is measured using valuation
techniques (e.g. quoted prices for similar
assets or liabilities in active markets or
the discounted cash flow (DCF) model).
Where possible, the inputs to these
valuation techniques are based on
observable data, but where this is not
possible judgement is required in
establishing fair values.  These
judgements typically include
considerations such as uncertainty and
risk.  Changes in the assumptions used
could affect the fair value of the
Council’s assets and liabilities.
Where Level 1 inputs are not available,
the Council utilises relevant experts to
identify the most appropriate valuation
techniques (for example for surplus
assets and non-current assets held for
sale, the Council’s estates valuer and for
financial instruments the Council’s
treasury advisors).
Information about the valuation
techniques and inputs used in
determining the fair value of the
Council’s assets and liabilities is
disclosed in notes 16, 18 and 27.
The Council uses the DCF model to
measure the fair value of financial
instruments.  Surplus assets and non-
current assets held for sale have been
based on the market value approach. 
Market conditions are such that similar
properties are marketed, purchased and
sold actively.
The significant observable inputs used
include current market conditions and
recent sales prices and other relevant
information for similar assets in the West
Dunbartonshire area together with evidence
across the wider West of Scotland for
surplus assets and non-current assets held
for sale and discount rates for financial
instruments.
Significant changes in any of these would
result in significantly lower or higher fair
value measurement for financial
instruments as detailed in note 27. 
Significant changes to the key inputs for
non-financial assets would have a
significant impact on the value of the
properties. However as the properties are
valued annually and form a small proportion
in relation to the value of the Council’s
overall portfolio the impact of any changes
would be limited.
Page 132

Page 133

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
58
Notes to the Financial Statements
Estimation assumptions which impact longer term:
Item Uncertainty Potential effect
Pension
liability
Estimation of the net liability to pay
pensions depends on a number of
complex judgements relating to the
discount rates used, the rate at which
salaries are projected to increase by,
changes to retirement ages, mortality
rates and expected returns on pension
assets held. This is further detailed
within Note 11 to the Financial
Statements. A firm of consulting
actuaries is engaged to provide the
Council with expert advice about the
assumptions applied.
The effect on the net liability can be
measured. For example, a decrease in the
discount rate of 0.1% would increase the
pension liability held on the Balance sheet
by 2% or £21.239m; and increase in the
pension rate by 0.1% would increase the
pension liability held on the Balance sheet
by 2% or £18.250m
However, the assumptions interact in
complex ways. During 2021/22 the
appointed actuaries advised that the net
liability had decreased year on year by
£107.925m as a result of estimates being
updated and an update to the assumptions.
The current liability held in the Council’s
balance sheet is £55.690m.
Note 4 – Accounting Standards that have been issued but have not yet been adopted
For 2021/22, the Code requires the disclosure of information relating to the expected impact of an
accounting change that will be required by a new standard that has been issued but not yet adopted.
This applies to the adoption of the following new or amended standards:
 Amendments to IAS16: Property, Plant, Equipment – proceeds before intended use;
 Annual improvements to IFRS Standards 2018 – 2020 (the annual IFRS improvement
programme) includes:
- Amendments:
o IFRS1: First time adoption, in relation to foreign operations of acquired subsidiaries
transitioning to IFRS;
o IAS41: Agriculture
- Clarifications:
o IAS37: Onerous contracts, in relation to clarifying the intention of the standard;
o IFRS16: Leases, removing a misleading example.
Overall, these new or amended standards are not expected to have a significant impact on the Annual
Accounts in future years.
IFRS16 Leases will require local authorities that are lessees to recognise these leases on their
Balance sheet as right-of-use assets along with the corresponding liabilities, except for low value and
short term leases. CIPFA/LASACC have deferred implementation of this until 1 April 2023.
Page 133

Page 134

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
59
Notes to the Financial Statements
Note 5 - Material Items of Income and Expense
Where items are not disclosed on the face of the Comprehensive Income and Expenditure Statement,
the Code requires a disclosure of the nature and amount of material items. Material items of
expenditure charged to services in the year are shown in the table below:
Item Nature £000
Housing Benefit received Benefit received to support customers on low incomes with
housing rent costs
35,248
Housing Benefit paid Benefit paid to support customers on low incomes with
housing rent costs
(34,111)
Supplementation Residential Accommodation for adults and children with
disabilities
22,660
Unitary Charge Payment Public Private Partnership agreement for the provision of 3
secondary schools and one primary school
12,154
Landfill Tax A tax paid on the disposal of waste. It is payable to Her
Majesty’s Revenue and Customs (HMRC)
3,461
Insurances Insurance premiums for all policies 2,773
Care Homes Cost of providing care home services by external providers 3,857
Integration Joint Board - West
Dunbartonshire Health and Social
Care Partnership
Payments to other bodies 3,744
Integration Joint Board - West
Dunbartonshire Health and Social
Care Partnership
Day Support 2,407
Integration Joint Board - West
Dunbartonshire Health and Social
Care Partnership
Payments to Clients 2,729
Integration Joint Board - West
Dunbartonshire Health and Social
Care Partnership
Payments to external fostering agencies 1,500
Integration Joint Board - West
Dunbartonshire Health and Social
Care Partnership
Payments to Voluntary Organisations 2,506
Page 134

Page 135

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
60 
Notes to the Financial Statements 
Note 6 – Adjustments between funding accounting basis and funding basis under regulations 
This note provides further breakdown of the adjustments summarised in the Movement in Reserves Statement on page 40.  It is identified under the headings
Usable and Unusable Reserves.  Further detail of the reserves identified under the classification of usable and unusable is given in notes 29 and 30 on pages
97 to 101. 
2021/22 
General
Fund
Balance
HRA
Balance
Capital
Receipts
Reserve
Capital
Grants and
Receipts
Unapplied
Account
Capital
Reserve Capital Fund
Other
Reserves
Total
Usable
Reserves
£000 £000 £000 £000 £000 £000 £000 £000
Usable Reserves
Adjustments to the Revenue Resources
Pension Costs (transferred to (or from) the Pensions Reserve) (30,947) (1,169) 0 0 0 0 0 (32,116)
Financial Instruments (transferred to the Financial Instruments Adjustment Account) 8 7 0 0 0 0 0 15
Holiday Pay (transferred to the Accumulated Absences Reserve) 252 35 0 0 0 0 0 287
Reversal of entries included in the Surplus or Deficit on the Provision or Services in relation to capital
expenditure (these items are charges to the Capital Adjustment Account)
(13,020) (11,989) 0 0 0 0 0 (25,009)
(43,707) (13,116) 0 0 0 0 0 (56,823)
Adjustments between Capital and Revenue Resources
Transfer of non-current asset sale gain/loss from revenue to the Capital Receipts Reserve (998) 0 998 0 0 0 0 0
Statutory provision for the repayment of debt (transfer to the Capital Adjustment Account) 3,808 5,495 0 0 0 0 0 9,303
Capital expenditure financed from revenue balances (transfer to the Capital Adjustment Account) 72 13,175 0 0 0 0 0 13,247
2,882 18,670 998 0 0 0 0 22,550
Adjustments to the Capital Resources
Disposal of non-current asset sale proceeds 0 0 (3,268) 0 0 0 0 (3,268)
Transfer from the Capital Receipts Reserve to the Capital Fund/ Capital Grants and Receipts
Unapplied Account
0 0 2,240 (1,837) 0 (403) 0 0
Application of capital grants to finance capital expenditure 0 0 0 0 0 0 0
0 0 (1,028) (1,837) 0 (403) 0 (3,268)
Total Adjustments (40,825) 5,554 (30) (1,837) 0 (403) 0 (37,541)
Page 135

Page 136

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
61 
Notes to the Financial Statements 
2021/22 
Capital 
Adjustment
Account
Revaluation
Reserve
Pension
Reserve
Employee
Statutory
Adjustment
Account FIAA
Total
Unusable
Reserves
£000 £000 £000 £000 £000 £000
Unusable Reserves
Adjustments to the Revenue Resources
Pension Costs (transferred to (or from) the Pensions Reserve) 0 0 32,116 0 0 32,116
Financial Instruments (transferred to the Financial Instruments Adjustment Account) 0 0 0 0 (15) (15)
Holiday Pay (transferred to the Accumulated Absences Reserve) 0 0 0 (287) 0 (287)
Reversal of entries included in the Surplus or Deficit on the Provision or Services in relation to capital
expenditure (these items are charges to the Capital Adjustment Account)
25,009 0 0 0 0 25,009
25,009 0 32,116 (287) (15) 56,823
Adjustments between Capital and Revenue Resources
Statutory provision for the repayment of debt (transfer to the Capital Adjustment Account) (9,303) 0 0 0 0 (9,303)
Capital expenditure financed from revenue balances (transfer to the Capital Adjustment Account) (13,247) 0 0 0 0 (13,247)
(22,550) 0 0 0 0 (22,550)
Adjustments to the Capital Resources
Disposal of non-current asset sale proceeds 3,268 0 0 0 0 3,268
Depreciation adjustment between Capital Adjustment Account and Revaluation Reserve (7,746) 7,746 0 0 0 0 
Write out Revaluation Reserve of Disposals (617) 617 0 0 0 0
Use of the Capital Receipts Reserve to finance capital expenditure 0 0 0 0 0 0
Application of capital grants to finance capital expenditure 0 0 0 0 0
(5,095) 8,363 0 0 0 3,268
Total Adjustments (2,636) 8,363 32,116 (287) (15) 37,541
Page 136

Page 137

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
62 
Notes to the Financial Statements 
2020/21 
General
Fund
Balance
HRA
Balance
Capital
Receipts
Reserve
Capital
Grants and
Receipts
Unapplied
Account
Capital
Reserve
Capital
Fund
Other
Reserves
Total
Usable
Reserves
£000 £000 £000 £000 £000 £000 £000 £000
Usable Reserves
Adjustments to the Revenue Resources
Pension Costs (transferred to (or from) the Pensions Reserve) (15,967) (637) 0 0 0 0 0 (16,604)
Financial Instruments (transferred to the Financial Instruments Adjustment Account) 3 3 0 0 0 0 0 6
Holiday Pay (transferred to the Accumulated Absences Reserve) (117) 2 0 0 0 0 0 (115)
Reversal of entries included in the Surplus or Deficit on the Provision or Services in relation to
capital expenditure (these items are charges to the Capital Adjustment Account)
(4,390) (8,520) 0 0 0 0 0 (12,910)
(20,471) (9,152) 0 0 0 0 0 (29,623)
Adjustments between Capital and Revenue Resources
Transfer of non-current asset sale gain/loss from revenue to the Capital Receipts Reserve (883) 0 883 0 0 0 0 0
Statutory provision for the repayment of debt (transfer to the Capital Adjustment Account) 5,800 5,019 0 0 0 0 0 10,819
Capital expenditure financed from revenue balances (transfer to the Capital Adjustment Account) 274 8,637 0 0 0 0 0 8,911
5,191 13,656 883 0 0 0 0 19,730
Adjustments to the Capital Resources
Disposal of non-current asset sale proceeds 0 0 (2,167) 0 0 0 0 (2,167)
Transfer from the Capital Receipts Reserve to the Capital Fund/ Capital Grants and Receipts
Unapplied Account
0 0 1,284 (368) 0 (916) 0 0
Application of capital grants to finance capital expenditure 0 0 0 89 0 0 0 89
0 0 (883) (279) 0 (916) 0 (2,078)
Total Adjustments (15,280) 4,504 0 (279) 0 (916) 0 (11,971)
Page 137

Page 138

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
63 
Notes to the Financial Statements 
2020/21   
Capital 
Adjustment
Account
Revaluation
Reserve
Pension
Reserve
Employee
Statutory
Adjustment
Account FIAA
Total
Unusable
Reserves
£000 £000 £000 £000 £000 £000
Unusable Reserves
Adjustments to the Revenue Resources
Pension Costs (transferred to (or from) the Pensions Reserve) 0 0 16,604 0 0 16,604
Financial Instruments (transferred to the Financial Instruments Adjustment Account) 0 0 0 0 (6) (6)
Holiday Pay (transferred to the Accumulated Absences Reserve) 0 0 0 115 0 115
Reversal of entries included in the Surplus or Deficit on the Provision or Services in relation to capital
expenditure (these items are charges to the Capital Adjustment Account)
12,910 0 0 0 0 12,910
12,910 0 16,604 115 (6) 29,623
Adjustments between Capital and Revenue Resources
Statutory provision for the repayment of debt (transfer to the Capital Adjustment Account) (10,819) 0 0 0 0 (10,819)
Capital expenditure financed from revenue balances (transfer to the Capital Adjustment Account) (8,911) 0 0 0 0 (8,911)
(19,730) 0 0 0 0 (19,730)
Adjustments to the Capital Resources
Disposal of non-current asset sale proceeds 2,167 0 0 0 0 2,167
Depreciation adjustment between Capital Adjustment Account and Revaluation Reserve (9,012) 9,012 0 0 0 0 
Write out Revaluation Reserve of Disposals (426) 426 0 0 0 0
Use of the Capital Receipts Reserve to finance capital expenditure 0 0 0 0 0 0
Application of capital grants to finance capital expenditure (89) 0 0 0 0 (89)
(7,360) 9,438 0 0 0 2,078
Total Adjustments (14,180) 9,438 16,604 115 (6) 11,971
Page 138

Page 139

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
64
Notes to the Financial Statements
Note 7 – Events After the Balance Sheet Date
The draft Financial Statements were authorised for issue by the Chief Officer - Resources on 30 June
2022. Events taking place after this date are not reflected in the financial statements or notes. Where
events taking place after this date provide information about conditions existing as at 31 March 2022,
the figures in the Financial Statements and notes have been adjusted in all material respects to reflect
the impact of this information. 
Note 8- Related Parties
The council is required to disclose material transactions with related parties – bodies or individuals that
have the potential to control or influence the Council or to be controlled or influenced by the
council.  Disclosure of these transactions allows readers to assess the extent to which the Council
might have been constrained in its ability to operate independently or might have secured the ability to
limit another party’s ability to bargain freely with the Council. 
Central & Scottish Government 
The Scottish Government has effective control over the general operations of the Council. It provides
the statutory framework within which the Council operates, provides the majority of its funding in the
form of grants and prescribes the terms of many transactions that the Council has with other parties
(e.g. council tax, housing benefits). The details of grants received and balances due in comparison to
previous year are as shown in Note 10 Grant Income. Related transactions with comparison to previous
years detailed below:
Elected Members
Members of the Council have direct control over the Council’s financial and operating policies.  The total
of members’ allowances paid in 2021/22 is shown in the remuneration statement on pages 31 to
38. The Council maintains a register of interests for Members and reviews this for transactions carried
out in the year with entities which Members have an interest.  In the year ended 31 March 2022, the
Council has not had any material transactions for any body in which Members have an interest. The
elected member’s register of interest can be found on the Council’s website page:
https://www.west-dunbarton.gov.uk/council/councillors-and-committees/councillors-allowances/
Subsidiaries
Subsidiaries are independent bodies over which the Council is considered to have control. The
following subsidiaries have been identified and are included in the group accounts pages 108-117.
West Dunbartonshire Leisure Trust
Established in April 2012, the Leisure Trust is a company limited by guarantee and has charitable
status. It is responsible for the Strategic and Operational Management of West Dunbartonshire
Council’s sports and leisure facilities. Community facilities, Sports development, Active Schools and
Events. 
2020/21  2021/22 
£000  £000 
209,049 Revenue Grants Received        214,812 
25,839 Capital Grants Received 5,272 
54,895 Other Grants Received 54,833       
2,489 Capital Grants Balance due at 31 March 2022 480
751 Other Grants Balance due at 31 March 2022 1,554
Page 139

Page 140

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
65
Notes to the Financial Statements
The Council has representation on the Board of Trustees, with three of the nine Trustees being Council
elected members. The related transactions with comparison to previous year are as detailed below: 
Clydebank Property Company
The company is owned by the Council which holds 100% of the issued share capital. The Council holds
an investment within its Balance Sheet and has full representation on the Board of Directors, with each
of the three Directors of the company being senior officers within the Council. The company paid a
dividend to the Council in 2021/22. Related transactions with comparison to previous year are as
detailed below:
Clydebank Municipal Bank
Clydebank Municipal Bank was established in 1921 to provide basic banking to residents of West
Dunbartonshire. The Council has full representation on the Board with the Chair and the Directors being
Elected Members of the Council, and both the Bank Manager and the Company Secretary to the Board
being council officers. Banking staff are employed by the Council.
West Dunbartonshire Energy LLP 
An Energy Services Company established in May 2021, and is a Limited Liability Partnership (LLP)
which relates to the running and expansion of a local District Heating Network. The service is delivered
within a partnership between the Council and Vital Energi (the Network Operator). The Council owns
99.9%, with Clydebank Property Company (a wholly owned subsidiary of the Council) owning 0.1%.
The Members of the partnership (LLP) are the Council and the Clydebank Property Company related
transactions are noted below: 
Associates
Associates are bodies which the Council has significant influence over, but do not meet criteria of
subsidiaries. The following associates have been identified in the financial year 2021/22 and are
included in the wider group accounts pages 108-117. 
2020/21  2021/22 
£000  £000
5,128 Contribution to Leisure Trust 5,706
(81) Income from Leisure Trust (71)
2020/21  2021/22 
£000  £000
273 CPC Investment held 273
(50) Dividend Received from CPC (50)
2020/21
£000 
2021/22
£000
51 Costs charged to the Bank 62       
1,306 Balance due from the Council 1,306
65 Balance due to the Council 84 
2020/21  2021/22 
£000  £000
0 Balance due to the Council              397
Page 140

Page 141

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
66
Notes to the Financial Statements
Strathclyde Passenger Transport (SPT)
SPT is the statutory body responsible for formulating the public transport policy on behalf of the 12 local
authorities in the West of Scotland. The Council make a contribution to SPT with comparison to
previous year figures as detailed below:
Strathclyde Concessionary Travel Scheme
Strathclyde Concessionary Travel Scheme Joint Board oversees the operation of the concessionary
fares scheme for public transport on behalf of the 12 local authorities in the West of Scotland. The
Council made a contribution with comparison to previous year figures as detailed below: 
West Dunbartonshire Health & Social Care Partnership 
The Council is also a partner in the West Dunbartonshire Health and Social Care Partnership
(HSCP).The HSCP was established in July 2015 as a partnership between the Council and NHS
Greater Glasgow & Clyde. It is responsible for planning and overseeing the delivery of a full range of
community health and social work/social care services, including those for older people, adults, children
and families. People in the Criminal Justice System and allied health professionals. The Council made a
contribution to the HSCP relating to the integrated and social care functions, with comparison to
previous year figure as detailed below:
Dunbartonshire and Argyll and Bute Valuation Joint Board (DABVJB)
DABVJB was formed in 1996 at local government re-organisation by an Act of Parliament. The Board
maintains the electoral, council tax and non-domestic rates registers for the three councils of West
Dunbartonshire, East Dunbartonshire and Argyll and Bute. The Board’s running costs are met by the
three authorities, with surpluses and deficits on the Board’s operations also shared between the
councils. The Council made a contribution to DABVJB with comparison to previous year figure as
detailed below:
Joint Ventures
The following Joint ventures in which the Council is a joint venture were identified. 
2020/21  2021/22 
£000  £000       
2,186 Contribution from Council 1,421 
2020/21  2021/22 
£000  £000
162 Contribution from Council              164 
2020/21
£000 
2021/22
£000 
70,873 Contribution from Council 74,925 
2020/21
£000 
2021/22
£000
714 Contribution from Council 736
Page 141

Page 142

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
67 
Notes to the Financial Statements 
Joint Boards 
The Joint Boards are independent public bodies formed by an Act of Parliament. All local government
functions that relate to these bodies have been delegated from the constituent councils that comprise
the area of each Board. The members of each Board are elected Councillors and are appointed by the
councils in proportions specified by legislation. 
As well as being included under the wider definition of “Associates”. The council is also a member of the
following joint boards of which the related transactions are detailed above under Associates. 
Strathclyde Passenger Transport 
Strathclyde Concessionary Travel
Dunbartonshire Argyll and Bute Valuation Joint Board
West Dunbartonshire Health & Social Care Partnership. 
Key Management 
Within the Council’s Management Team, the Chief Officer of the HSCP is employed by the Council.
Details of remuneration are included within the Council’s Remuneration Statement pages 31 to 38. 
Other Related Parties 
Voluntary Sector 
The following voluntary organisations received over £50,000 in grant funding from the Council during
2021/22: 
The Council has no shareholdings or investments in any of these organisations.  There were no
outstanding balances at the year end. 
Strathclyde Pension Fund 
The Council is an admitted body to the local government pension scheme and has made payments as
shown in Note 13 Defined Benefit Pension Schemes.  The related transaction with comparison to
previous year is shown below:   
2020/21  2021/22 
£000  £000          
355 West Dunbartonshire Citizens Advice Bureau              349          
106 Independent Resource Centre              216          
185 Y-Sort It Youth Information Project              156          
180 The Environment Trust              177          
159 Dumbarton Women's Aid              177          
165 Clydebank Women's Aid              187 
2020/21  2021/22 
£000  £000       
1,966 Balance owed by the Council at 31st March 2022           2,006
Page 142

Page 143

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
68 
Notes to the Financial Statements 
Senior Officers 
Senior Officers have control over the Councils financial and operating policies. The remuneration paid
to these individuals is as listed in the remuneration statement pages 31 to 38. Officers are required to
follow a Code of Conduct and are require to declare an interest if he or she believes that there may be a
perception that their decision making may be influenced in any way by a personal interest. Should this
situation arise, the senior officer does not take part in any discussion or decision in relation to that
interest. There are no significant related party transactions with senior officers of the Council. 
Note 9 – Agency Services 
Transactions whereby the Council provides a service on behalf of external organisations are noted
below. 
The Council also received a number of grants from the Scottish Government in 2021/22 related to
COVID, whereby the Council acted as an agent on behalf of the Government. These grants are listed
below and the effect of these have been removed from the Comprehensive Income and Expenditure
Statement. Where expenditure was less than income a creditor has been raised within the Council’s
Balance Sheet. 
Organisation Description
2021/22
Receipts
2021/22
Payment
(Debtor)/
Creditor at
31.03.22
£000 £000 £000
Scottish Water Water and sewerage
charges collected by Council
and paid over
0 14,604 225
Scottish
Government
Non Domestic Rates (76,850) 0 (2,599)
2020/21 2021/22
£000 £000
8,055 Strategic Framework 4,998
0 Scottish Child Bridging Payment Fund 1,748
0 Low Income Pandemic Payments 1,508
788 Taxi and Private Hire Support 1,305
0 COVID-19 Discretionary Business Grant 1,125
0 Self Isolation Fund 1,053
0 Social Care thank you payments 986
0 Hospitality Fund 978
0 Teacher payments 212
0 Route Map Extension Restrictions Fund 138
113 Self Isolation Grant Payments 0
14,634 COVID-19 Support for Businesses 0
174 Newly Self-Employed Hardship fund 0
243 Break Restrictions Fund 0
145 Contingency Fund 0
119 ELC Transitional Support Fund 0
277 Other (under £0.100m) 233
24,548   14,284   
Page 143

Page 144

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
69 
Notes to the Financial Statements 
Note 10 – Grant Income 
The Council credited the following grants and other contributions to Taxation and Non-specific Grant
Income within the Comprehensive Income and Expenditure Statement in 2021/22, including general
grant funding in relation to COVID received through redeterminations: 
The Council credited the following grants to Services within the Comprehensive Income and
Expenditure Statement in 2021/22, including service specific general grant funding in relation to COVID: 
31 March 2021 31 March 2022
£000 £000
209,049 Revenue Support Grant/ Non-Domestic Rates 214,812
0 Levelling Up Fund 1,992
1,190 Sustrans - Connecting Clydebank 972
4,439 New House Build 909
169 Cycling, Walking, Safer Streets 682
16,384 General Services Capital Grant 629
0 Housing Buy Backs 481
629 Exxon City Deal 444
137 Strathclyde Passenger Transport 344
0 Spaces for People 279
123 Levengrove 259
0 Place Based Investments 139
0 CO2 Monitors in Schools 122
0 District Heating 120
0 Nature Restoration Fund 102
2,083 Early Year Funding 0
552 Town Centre Fund 0
170 Transport Scotland - Electrical Charging Points 0
334 Grants under £0.100m 272
235,259 222,558
31 March 2021 31 March 2022
£000 £000
34,262 Housing Benefit Subsidy 34,111
9,932 NHS Resource Transfer 10,083
8,597 Early Learning 9,247
2,550 Pupil Equity Fund 2,917
2,057 Criminal Justice 2,229
848 Scottish Attainment Challenge Scotland Fund 979
1,196 Scottish Attainment 901
580 Business Gateway 580
111 Young Person's Guarantee 569
0 Vaccination Centres (COVID) 534
364 Private Sector Housing 446
370 Care Experienced Children and young People 413
324 Asylum Seekers 349
0 Mental Wellbeing 308
770 Education additional staff support ( COVID) 287
382 Education Maintenance Allowance 280
0 Parental Employability Support Fund 229
6,671 Social Care Funding 0
5,880 Social Care Funding (COVID) 0
632 Free School Meals and Community Food (COVID) 0
594 Winter Plan for Social Protection 0
400 Interim Care Funding 0
237 Funding to Administer Temp Restrictions 0
168 Discretionary Housing payment additional (COVID) 0
132 Worthy Causes - Free School Meals (COVID) 0
128 Scottish Government - ERO 0
100 No-one Left Behind 0
493 Grants under £0.100m 454
77,778 64,916
Page 144

Page 145

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
70 
Notes to the Financial Statements 
The Council has received a number of grants that have yet to be recognised as income as they have
conditions attached to them that will require the monies or property to be returned to the giver.  The
balances at the year end are as follows: 
In addition, some COVID grants received from the Scottish Government during 2021/22 which were
identified as agency transactions are detailed within Note 9. 
Note 11 – Operating Leases 
Council as Lessee 
The council occupies a number of properties by way of an operating lease. The future minimum lease
payment due under non-cancellable leases in future years are: 
The expenditure charged to the appropriate service lines in the Comprehensive Income and Expenditure
Statement during the year in relation to these leases was £0.769m (2020/21 £0.775m). 
The Council has acquired vehicles and equipment by entering into operating leases. The future
minimum lease payment due under non-cancellable leases in future years are: 
The expenditure charged to the appropriate service lines in the Comprehensive Income and Expenditure
Statement during the year in relation to these leases was £0.290m (2020/21 £0.380m). 
Council as Lessor
The Council leases out property under operating leases for the following purposes: 
31 March 2021 31 March 2022
£000 £000
0 Place Based Investment 641
0 Exxon City Deal 192
593 Town Centre Fund 142
0 Bonhill Gaps sites 128
0 Queen Quay District Heating 120
0 Pappert New Builds 119
0 Knowes Nature Reserve 102
331 Digital Inclusion 41
159 Early Years Funding 0
180 Grants under £0.100m 608
1,263 2,093
31 March 2021 31 March 2022
£000 £000
765 Not later than one year 731
2,363 Later than one year and not later than five years 2,019
2,036 Later than five years 2,036
5,164 4,786
31 March 2021 31 March 2022
£000 £000
273 Not later than one year 236
410 Later than one year and not later than five years 336
0 Later than five years 0
683 572
Page 145

Page 146

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
71
Notes to the Financial Statements
 For the provision of community services, such as sports facilities, tourism services and
community centres; and
 For economic development purposes to provide suitable affordable accommodation for local
businesses.
The future minimum lease payment due under non-cancellable leases in future years are:
The minimum lease payments receivable do not include rents that are contingent on events taking
place after the lease was entered into, such as adjustments following rent reviews.  In year, £1.431m
contingent rents were receivable by the Council (2020/21 £2.812m).
Finance Leases - The Council does not have any assets or liabilities under a finance lease, either as
Lessee or Lessor.
Note 12 – Termination Benefits
The Council did not terminate the contracts of a number of employees in year (2020/21 liabilities
incurred £0.065m). 
Note 13 – Defined Benefit Pension Schemes
As part of the terms and conditions of employment of its officers and other employees, the council offers
retirement benefits.  Although these benefits will not actually be payable until employees retire, the
Council has a commitment to make the payments that needs to be disclosed at the time that employees
earn their future entitlement.
The Council participates in the following pension schemes:
The Local Government Pension Scheme, which is a defined benefit statutory scheme, operated as
Strathclyde Pension Fund, and administered by Glasgow City Council in accordance with the Local
Government Pension Scheme (Scotland) Regulations 1998.  This is a funded scheme, meaning that the
Council and employees pay contributions into a fund, calculated at a level intended to balance the
pensions liabilities with investment assets.  The employer’s contribution rate is set by the Fund
actuaries following valuation.  The employer contribution rate for 2021/22 was 19.3%, and 2022/23 is
set at 19.3%.  In 2021/22, the Council paid an employer’s contribution of £19.851m (2020/21
£19.558m).
The Teachers’ Pension Scheme (Scottish Teachers’ Superannuation Scheme (STSS) which is a
defined benefit scheme administered by the Scottish Public Pension Agency.  The scheme is
technically a multi-employer defined benefit scheme but is unfunded and the Scottish Government 
used a notional fund as the basis for calculating  the employers’ contribution rate paid by local
authorities. Due to the type of scheme, the Council is not able to identify its share of the underlying
financial position and performance of the scheme with sufficient reliability for accounting purposes.  For
the purpose of this Statement of accounts, it is accounted for on the same basis as a defined
contribution scheme.
31 March 2021 31 March 2022
£000 £000
3,627 Not later than one year 3,583
11,442 Later than one year and not later than five years 11,249
134,633 Later than five years 127,729
149,702 142,561
Page 146

Page 147

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
72 
Notes to the Financial Statements 
The employer pays a set contribution rate of 23% which is effective from 1 September 2019, prior to this
it was 17.2%.  This is charged directly to the revenue account for the Education service.  The amount
paid over in respect of employer’s contribution was £10.291m (2020/21 £10.216m) in respect of
expenditure for teachers added years, £0.039m payments were made (2020/21 £0.040m). 
The scheme is unfunded and all contributions (payable by members or employers) are paid to the
Scottish Government, and the Scottish Government then meets the costs of all the benefits.  A specific
amount is held by the Scottish Government for this purpose.  As a proportion of the total contributions
into the Scottish Teachers Superannuation Scheme 2021/22, the Council’s own contribution equates to
1.57%. 
The Council is not liable to the scheme for any other entities obligations under the plan. 
1) Local Government Pension Scheme 
Councils are also required to disclose the capital cost of discretionary increases in pension payments
agreed by the Council.  In 2021/22 the capitalised costs that would have arisen from the early retiral of
the Council employees and from predecessor authorities were as follows: 
The Council fully complies with the International Accounting Standard (IAS 19) concerning the
disclosure of information on the pension. IAS 19 states that although the pension benefits will not be
paid until the employee retires, the Council has a commitment to make these payments and must
disclose the cost of this in its accounts at the time employees earn their full entitlement. 
The Council therefore recognises the cost of the pension commitment within the Comprehensive
Income and Expenditure Account when the employees earn their pension entitlement rather than when
the benefits are paid as pensions.  However, the cost to the taxpayer is calculated on the basis of
pension contributions paid in the year, the cost of retirement benefits under IAS19 is reversed out, to
ensure there is no impact on the overall cost to be funded by council tax and government grants. 
The following transactions have been made in the Comprehensive Income and Expenditure Account
and Movement in Reserves Statement during the year: 
£000
2021/2022 (4,888)
In earlier years 58,282
Total 53,394
Page 147

Page 148

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
73 
Notes to the Financial Statements 
The underlying assets and liabilities for retirement benefits attributable to the council as at 31 March are
as follows: 
1) Local Government Pension Scheme
The liabilities show the underlying commitments that the Council has in the long run to pay post-
employment (retirement) benefits.  The total liability of £55.690m has a substantial negative impact on
the net worth of the Council as recorded in the Balance Sheet, resulting in an overall balance of
£421.596m. However, the statutory arrangements for funding the deficit, means the financial position of
the Council remains healthy. 
The deficit on the local government scheme will be made good by increased contributions over the
remaining working life of employees (i.e. before payments fall due) as assessed by the scheme actuary.
Finance is only required to be raised to cover discretionary benefits when the pensions are actually paid. 
The fair value of plan assets have increased by £77.859m. This is due to asset returns being more
favourable than anticipated.   
The estimated liabilities have decreased by £30.106m, due to financial assumptions as at 31 March 2022
being more favourable than they were at 31 March 2021. 
2020/21 2021/22
£000 £000
Net cost of services
35,717 Current service cost 51,324
74 Past service cost 0
35,791 51,324
Financing and investment Income and Expenditure
3,379 Net interest expense 3,557
39,170 Total post employment benefit charged to the Surplus or Deficit on the
provision of Services
54,881
(181,163) Expected return on assets (55,488)
(30,778) Actuarial gains and losses arising from changes in demographic assumptions (7,291)
232,640 Actuarial gains and losses arising from changes in financial assumptions (78,984)
(7,765) Actuarial gains and losses arising from experience assumptions 1,722
52,104 Total post employment benefit charged to the comprehensive income and
expenditure statement
(85,160)
Movement in Reserves Statement
(39,170) Reversal of gross charges made to surplus or deficit for post employment
benefits
(54,881)
22,566 Actual amount charged against the General Fund balance in the year - employer
contributions payable to Scheme
22,765
(16,604) Reversal of gross charges made to surplus or deficit for post employment
benefits
(32,116)
2020/21 2021/22
£000 £000
974,343 Fair value of plan assets 1,052,202
(1,079,676) Present value of defined benefit obligations (1,054,498)
(105,333) Net assets in the Strathclyde Pension Fund (2,296)
Present Value of Unfunded Liabilities
(27,955) LGPS Unfunded (25,835)
(24,265) Teachers’ pensions (22,386)
(6,062) Pre Local Government Reorganisation (5,173)
(163,615) Net pension asset/(liability) (55,690)
Page 148

Page 149

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
74 
Notes to the Financial Statements 
2) Pension Assets and Liabilities 
Liabilities have been valued on an actuarial basis using the projected unit method which assesses the
future liabilities of the fund discounted to their present value. The liabilities have been assessed by
Hymans Robertson, an independent firm of actuaries, contracted by Glasgow City Council to provide all
IAS19 calculations on behalf of the councils within the Strathclyde Pension Fund. The funded obligation
is noted below: 
The movement during the year on the defined obligation is noted as: 
The movement during the year on the fair value of the employer’s assets is: 
%
Active Members 58.4%
Deferred Members 9.4%
Pensioner Members 28.3%
Pre-Local Government Re-organisation Members 3.9%
100%
2020/21 2021/22
£000 £000
928,731 Opening balance 1,137,958
35,717 Current service cost 51,324
21,675 Interest cost 23,072
6,075 Contributions by Members 6,137
(30,778) Actuarial gains/losses – change in demographic assumptions (7,291)
232,640 Actuarial gains/losses – change in financial assumptions (78,984)
(29,214) Actuarial gains/losses – other experience 1,722
74 Past service costs/(gains) 0
(3,008) Estimated unfunded benefits paid (2,914)
(23,954) Estimated benefits paid (23,172)
1,137,958 Closing Balance as at 31 March 1,107,852
2020/21 2021/22
£000 £000
794,654 Opening balance 974,343
181,163 Expected return on assets 55,488
(21,449) Actuarial gains/ losses - othe experience 0
18,296 Interest Income 19,515
6,075 Contributions by Members 6,137
19,558 Contributions by employer 19,851
3,008 Contributions in respect of unfunded benefits 2,914
(3,008) Estimated unfunded benefits paid (2,914)
(23,954) Estimated benefit paid (23,132)
974,343 Closing Balance as at 31 March 1,052,202
Page 149

Page 150

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
75 
Notes to the Financial Statements 
The Council’s share of the pension fund asset at 31 March 2022 comprised: 
Assets are now held at bid value. 
Asset and Liability Matching Strategy (ALM) 
The main fund of Strathclyde Pension Fund does not have an asset and liability matching strategy
(ALM) as this is used mainly by mature funds.  The Fund does match, to the extent possible, the types
of assets invested to the liabilities in the defined benefit obligation.  As is required by the pensions and
investment regulations, the suitability of various types of investment has been considered, as has the
need to diversify investments to reduce the risk of being invested into narrow a range.  The Fund
invests in equities, bonds, properties and in cash. 
The Fund has now taken account of the national change to the Local Government Pension Scheme in
Scotland such as the new career average revalued earning scheme (CARE) for future accruals. 
The actuarial valuation states that assets held on the valuation date were sufficient to cover 95%
(2020/21 85.6%) of accrued liabilities at that date. 
The principal actuarial assumptions used at the Balance Sheet date are as follows: 
Quoted
prices in
Active
Markets
Prices not
quoted in
Active
Market
Total Asset Category Quoted
prices in
Active
Markets
Prices not
quoted in
Active
Market
Total
£000 £000 £000 £000 £000 £000
227,564 1,048 228,612 Equity Securities 231,344 501 231,845
0 0 0 Debt Securities 0 0 0
0 174,272 174,272 Private Equity 0 205,983 205,983
0 78,943 78,943 Real Estate 0 88,736 88,736
9,170 466,813 475,983 Investment funds and unit trusts 5,837 493,028 498,865
176 0 176 Derivatives 0 0 0
15,697 660 16,357 Cash and Cash Equivalent 26,418 355 26,773
252,607 721,736 974,343 Totals 263,599 788,603 1,052,202
2021/222020/21
31/03/2021 31/03/2022
2.85% Pension increase rate 3.20%
3.55% Salary Increase rate 3.90%
2.00% Discount rate 2.70%
Mortality
Based on these assumptions, the average future life expectancies at the
age of 65 are:
19.8 Current pensioners – Men 19.6
22.6 Current pensioners - Women 24.4
21.2 Future pensioners – Men 21.0
24.7 Future pensioners - Women 24.5
Long term expected return on assets
Page 150

Page 151

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
76 
Notes to the Financial Statements 
The above excludes any net pension liability that the Council may have to contribute to in respect of the
Joint Boards of Partnership for Transport and Valuation.   These costs are shown within each Joint
Board’s Balance Sheet and the Council may be required to make an increased constituent contribution
in the years when the liability fails to be met. 
The principal risks to the Council of the scheme are the longevity assumptions, statutory changes to the
scheme, structural changes to the scheme (i.e. large-scale withdrawals from the scheme), changes to
inflation, bond yields and the performance of the equity investments held by the scheme.  These are
mitigated to a certain extent by the statutory requirements to charge to the General Fund and Housing
Revenue Account the amounts required by statute as described in the accounting policies note. 
Sensitivity Analysis 
In order to quantify the impact of a change in the financial assumptions used, the actuaries have
calculated and compared the value of the scheme liabilities as at 31 March 2022 on varying bases.  The
approach taken is consistent with that adopted to derive at the IAS19 figures provided.  To quantify the
uncertainty around life expectancy, the actuaries have calculated the difference in cost to the employer
of a one year increase in life expectancy.  For sensitivity purposes, this is assumed to be an increase in
the cost of benefits of around 3% to 5%.  In practice the actual cost of a one year increase in life
expectancy will depend on the structure of the revised assumption (i.e. if improvements to survival rates
predominately apply at younger or older ages). 
The figures have been derived based on the membership profile of the Employer as at the date of the
most recent actuarial valuation. 
The estimation of defined benefit obligation is sensitive to the actuarial assumptions .The sensitivity 
regarding the principal assumptions used to measure the schemes liabilities are set out below: 
The total contribution expected to be made to the Local Government pension scheme for 2022/23 is
£19.851m. 
Note 14 – External Audit Costs 
In 2021/22 the Council incurred £0.281m (2020/21 £0.277m) in respect of its external audit services on
behalf of the Council and £0.002m (2020/21 £0.002m) on behalf of the Trust Funds, undertaken in
accordance with the Code of Audit Practice. 
The appointed auditors, Audit Scotland, provided no other services to the Council in the year. 
Note 15 – Expenditure and Funding Analysis 
The analysis of income and expenditure on the face of the comprehensive income and expenditure
statement is that specified by the Service Reporting Code of Practice.  However decisions about resource
allocation are taken by the Council on the basis of reports that are prepared on a different basis from the
accounting polices used in the financial statements.  In particular: 
Approximate
monetary Amount
£000
Real Discount Rate (0.5% decrease ) 2% 21,239
1 year increase in the member life expectancy 4% 44,316
Salary Increase Rate (0.5% increase) 0% 2,807
Pension Increase Rate (0.5% increase) 2% 18,250
Approximate %
increase to
Employer Liability
Page 151

Page 152

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
77
Notes to the Financial Statements
 no charges are made in relation to capital expenditure (whereas depreciation, revaluation and
impairment losses in excess of the balance on the revaluation reserve and amortisations are charged
to services in the comprehensive income and expenditure statement); and
 the cost of retirement benefits is based on cash flows (payments of employer’s pensions
contributions) rather than current service cost of benefits accrued in the year.
The service expenditure noted as ‘net rechargeable to the General Fund and the HRA’ can also be
compared to the service spend noted in the Council’s revenue budget monitoring table in the Management
Commentary, except where there are items in the Comprehensive Income and Expenditure Statement
that are reported below the net cost of service line.
The council’s income and expenditure as noted on the comprehensive income and expenditure statement
analysis can also be given by nature of spend and is analysed as follows:
A further breakdown of fees, charges and other service income by segmental analysis is noted below:
2020/21 2021/22
£000 £000
Expenditure
214,249 Employee benefits expenses 237,304
253,323 Other service expenses 266,430
3,894 Support service recharges 3,962
39,268 Depreciation, amortisation, impairment 32,756
22,558 Interest payments 21,422
2,339 Precepts and levies 2,517
883 Loss on the disposal of assets 998
536,514 Total Expenditure 565,389
Income
(261,583) Fees, charges and other service income (262,551)
(165) Interest and investment income (81)
(92,728) Income from council tax and non-domestic rates (119,615)
(179,296) Government grants and contributions (141,150)
(533,772) Total Income (523,397)
2,742 (Surplus) / Deficit on the Provision of Services 41,992
2020/21 2021/22
£000 £000
(42,105) Corporate Services (38,346)
(17,593) Education (15,424)
(17,814) Infrastructure, Regeneration and Economic Development (16,032)
(32,922) Housing and Communities (31,853)
(43,354) Housing Revenue Account (44,675)
(6,117) Miscellaneous Services (8,501)
(101,678) Health and Social Care Partnership (107,720)
(261,583) Total Fees, Charges and other service income (262,551)
Page 152

Page 153

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
78 
Notes to the Financial Statements 
The income and expenditure of the Council’s principal committee reporting structure recorded in the budget reports for the year is as follows: 
Net Chargeable to the
General Fund and HRA
Balance
Adjustments between
Funding and Accounting
Basis
Net Expenditure in the
Comprehensive Income
and Expenditure
Statement
Net Chargeable to
the General Fund
and HRA Balance
Adjustments between
Funding and
Accounting Basis
Net Expenditure in
the Comprehensive
Income and
Expenditure
Statement
£000 £000 £000 £000 £000 £000
20,549 5,332 25,881 Corporate Services 25,095 7,756 32,851
90,513 8,506 99,019 Education 98,757 11,421 110,178
29,934 20,061 49,995 Infrastructure, Regeneration and Economic Development 33,659 15,324 48,983
2,062 2,099 4,161 Housing and Communities 3,660 4,118 7,778
(22,944) 13,593 (9,351) Housing Revenue Account (20,106) 14,092 (6,014)
5,179 (2,699) 2,480 Miscellaneous Services 690 (2,170) (1,480)
69,865 5,718 75,583 Health and Social Care Partnership 74,017 10,487 84,504
2,339 0 2,339 Requisitions 2,517 0 2,517
197,497 52,610 250,107 Net Cost of Services 218,289 61,028 279,317
0 883 883 (Gain)/Loss on disposal of Fixed Assets 0 998 998
(245,814) (26,210) (272,024) Taxation and Non-specific Grant Income (253,019) (7,746) (260,765)
40,283 (16,507) 23,776 Finance / Investment Income and Expenditure 41,451 (19,009) 22,442
(8,034) 10,776 2,742 (Surplus) or Deficit on Provision of Service 6,721 35,271 41,992
(13,319) MIR Opening General Fund and HRA Balance as at 1 April 2021 (22,392)
(4,241) MIR (Surplus) or Deficit on Provision of Service (General Fund) 2,396
(3,793) MIR (Surplus) or Deficit on Provision of Service (HRA) 4,325
(1,039) MIR Transfer to/from other statutory reserves (2,083)
(22,392) MIR
Closing General Fund and HRA Balance as at 31 March
2022 (17,754)
2021/222020/21
Page 153

Page 154

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
79 
Notes to the Financial Statements 
Both the Movement in Reserves (page 40) and note 6 (page 60) total the adjustments between funding accounting basis and funding basis under
regulations relating to the General Fund balance (£40.825m net deductions) and HRA balance (£5.554m net additions) and this matches the total
adjustments above of £35.271m. 
Adjustments
for Capital
Purposes
Net Change for
the Pension
Adjustment
Other
differences Total
Adjustments
for Capital
Purposes
Net Change
for the
Pension
Adjustment
Other
differences Total
£000 £000 £000 £000 £000 £000 £000 £000
2,853 2,479 0 5,332 Corporate Services 3,204 4,552 0 7,756
5,553 2,807 146 8,506 Education 5,640 5,738 43 11,421
17,088 2,973 0 20,061 Infrastructure, Regeneration and Economic
Development
9,549 5,775 0 15,324
14 2,085 0 2,099 Housing and Communities 13 4,105 0 4,118
12,959 637 (3) 13,593 Housing Revenue Account 12,958 1,169 (35) 14,092
2 (2,673) (28) (2,699) Miscellaneous Services 312 (2,187) (295) (2,170)
800 4,918 0 5,718 Health and Social Care Partnership 1,080 9,407 0 10,487
0 0 0 0 Requisitions 0 0 0 0
39,269 13,226 115 52,610 Net Cost of Services 32,756 28,559 (287) 61,028
883 0 0 883 Other Operating Expenditure 998 0 0 998
(26,210) 0 0 (26,210) Taxation and Non-specific Grant Income (7,746) 0 0 (7,746)
(19,879) 3,378 (6) (16,507) Finance / Investment Income and Expenditure (22,551) 3,557 (15) (19,009)
(5,937) 16,604 109 10,776 3,457 32,116 (302) 35,271
2020/21 2021/22
Page 154

Page 155

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
80
Notes to the Financial Statements
Adjustment for Capital Purposes
This column adds in depreciation, impairment and revaluation gains and losses in the
services line, and for:
 Other operating expenditure – adjusts for capital disposals with a transfer of income on
disposal of assets and the amounts written off for those assets;
 Financing and investment income and expenditure – the statutory charges for capital
financing and other revenue contributions are deducted from other income and expenditure
as these are not chargeable under generally accepted accounting practices; and
 Taxation and non-specific grant income and expenditure – capital grants are adjusted for
income not chargeable under generally accepted accounting practices. Revenue grants are
adjusted from those receivable in the year to those receivable without conditions or for which
conditions were satisfied throughout the year. The Taxation and Non Specific Grant Income
and Expenditure line is created with capital grants receivable in the year without conditions
or for which conditions were satisfied in the year.
Net Change for the Pension Adjustments
Net change for the removal of pension contributions and the addition of IAS19 Employee
Benefits pension related expenditure and income:
 For services, this represents the removal of the employers contributions made by the Council
as allowed by statute and the replacement with current service costs and past service costs;
and
 For financing and investment income and expenditure, the net interest on the defined benefit
liability is charged to the Comprehensive Income and Expenditure Statement.
Other Differences
Other differences between amounts debited or credited to the Comprehensive Income and
Expenditure Statement and amounts payable or receivable to be recognised under statute:
 For services an adjustment is made for the accrual of holiday pay and other similar
entitlements, this is required under generally accepted accounting principles but the impact on
the General Fund and the HRA is mitigated by statute which allows the impact to be reversed
out through the Movement in Reserves; and
 For Financing and investment income and expenditure, the ‘other differences’ column
recognises adjustments to the General Fund for the timing differences for premiums and
discounts.
Page 155

Page 156

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
81
Notes to the Financial Statements
Note 16 – Property, Plant and Equipment
1) Movements in 2021/22
Council
dwellings
Other Land &
buildings
Industrial
Units
Vehicles &
Plant Infrastructure Community
Surplus
Assets
Assets Under
Construction
Property Plant
& Equipment
£000 £000 £000 £000 £000 £000 £000 £000 £000
Cost/Valuation at 1 April 2021 591,116 404,959 45,002 30,903 118,339 8,463 6,336 99,822 1,304,940
Additions 28,080 9,129 0 3,056 10,016 575 0 12,730 63,586
Revaluations:
- To Revaluation Reserve 0 4,671 0 0 0 0 0 0 4,671
- To Net cost of Service 0 284 0 0 0 0 (183) 0 101
Disposals 0 (229) 0 0 0 0 0 0 (229)
Assets reclassified  to/from  Held for Sale 0 0 0 0 0 0 0 0 0
Adjustments - assets at nil NBV 0 (80) (772) (2,448) (772) 0 (139) 0 (4,211)
Adjustments - change in asset type 35,306 18,096 0 0 0 0 0 (53,502) (100)
As at 31 March 2022 654,502 436,830 44,230 31,511 127,583 9,038 6,014 59,050 1,368,758
Depreciation/Impairment at 1 April 2021 (86,648) (48,121) (1,673) (11,463) (43,636) (2,032) (140) 0 (193,713)
Depreciation charge (12,683) (9,667) (410) (3,884) (5,313) (422) (1) 0 (32,380)
Depreciation:
- To Revaluation Reserve 0 (360) 0 0 0 0 0 0 (360)
- To Net Cost of Service 0 0 0 0 0 0 0 0 0
Impairments:
- To Revaluation Reserve 0 0 0 0 0 0 0
- To Net Cost of Service 0 (151) 0 0 0 0 0 0 (151)
Adjustments - assets at nil NBV 0 80 772 2,448 772 0 139 0 4,211
Adjustments - change in asset type 0 0 0 0 0 0 0 0 0
As At 31 March 2022 (99,331) (58,219) (1,311) (12,899) (48,177) (2,454) (2) 0 (222,393)
Net Book Value at 31 March 2021 504,468 356,838 43,329 19,440 74,703 6,431 6,196 99,822 1,111,227
Net Book Value at 31 March 2022 555,171 378,611 42,919 18,612 79,406 6,584 6,012 59,050 1,146,365
Page 156

Page 157

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
82 
Notes to the Financial Statements 
2) Movements in 2020/21 
Council
dwellings
Other Land &
buildings
Industrial
Units
Vehicles &
Plant Infrastructure Community
Surplus
Assets
Assets Under
Construction
Property
Plant &
Equipment
£000 £000 £000 £000 £000 £000 £000 £000 £000
Cost/Valuation at 1 April 2020 505,069 380,219 45,034 26,712 123,206 5,475 9,594 104,814 1,200,123
Additions 19,466 7,218 15 4,658 11,239 1,646 135 46,886 91,263
Revaluations:
- To Revaluation Reserve 48,706 126 0 0 0 0 0 0 48,832
- To Net cost of Service 0 (5,243) 0 0 0 0 (1,510) 0 (6,753)
Disposals 0 0 (90) 0 0 0 (1,476) 0 (1,566)
Assets reclassified to/from Held for Sale 0 0 0 0 0 0 (357) 0 (357)
Adjustments - assets at nil NBV 0 (884) (7) (9,337) (16,374) 0 0 0 (26,602)
Adjustments - change in asset type 17,875 23,523 50 8,870 268 1,342 (50) (51,878) 0
As at 31 March 2021 591,116 404,959 45,002 30,903 118,339 8,463 6,336 99,822 1,304,940
Depreciation/Impairment at 1 April 2020 (73,974) (39,364) (1,269) (17,626) (54,658) (1,566) (140) 0 (188,597)
Depreciation charge (12,106) (9,613) (411) (3,174) (5,352) (466) 0 0 (31,122)
Depreciation:
- To Revaluation Reserve (568) (28) 0 0 0 0 0 0 (596)
- To Net Cost of Service 0 0 0 0 0 0 0 0 0
Impairments:
- To Revaluation Reserve 0 0 0 0 0 0 0 0 0
- To Net Cost of Service 0 0 0 0 0 0 0 0 0
Disposals 0 0 0 0 0 0 0 0 0
Adjustments - assets at nil NBV 0 884 7 9,337 16,374 0 0 0 26,602
Adjustments - change in asset type 0 0 0 0 0 0 0 0 0
As At 31 March 2021 (86,648) (48,121) (1,673) (11,463) (43,636) (2,032) (140) 0 (193,713)
Net Book Value at 31 March 2020 431,095 340,855 43,765 9,086 68,548 3,909 9,454 104,814 1,011,526
Net Book Value at 31 March 2021 504,468 356,838 43,329 19,440 74,703 6,431 6,196 99,822 1,111,227
Page 157

Page 158

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
83 
Notes to the Financial Statements 
3)   Capital Commitments 
As at 31 March 2022, the Council has commitments on capital contracts for the construction or
enhancement of property, plant and equipment for non housing and housing projects in 2021/22
budgeted to cost £8.335m (2020/21 £17.910m) and £1.477m (2020/21 £22.109m) respectively.  The
main commitments are: 
4) PPP and DBFM Assets Included in Property, Plant and Equipment 
5)   The Council measures its surplus assets at fair value at each reporting date (the Council does
not hold investment properties).  The fair value of surplus assets have been based on the
market value approach using current market conditions and recent sales prices and other
relevant information for similar assets in the West Dunbartonshire area together with evidence
across the wider West of Scotland.  Market conditions are such that similar properties are
marketed, purchased and sold actively and the level of observable inputs are sufficient,
leading to the properties being categorised at Level 2 in the fair value hierarchy.   
There were no transfers between Levels 1 and 2 during the year and there have been no
changes in the valuation techniques used during the year for surplus assets 
General Services £000
Local Economic Development & Regeneration - various projects 5,048
Posties Park 1,032
OLSP Changing Facility 341
Renton Campus (part of Schools Estate Improvement Plan) 254
Construction of Pitches St Mary's Primary School & Our Lady of Loretto 224
HRA £000
New Build Housing 767
External Wall Insulation 340
Structural Repairs Drumry 250
Restated
2020/21 2021/22
£000 £000
Cost or Valuation
114,219 At 1 April 2021 114,219
Revaluations
0 To Revaluation Reserve 0
0 Additions 0
114,219 At 31 March 2022 114,219
Accumulated Depreciation and Impairment
(5,052) At 1 April 2021 (7,578)
(2,526) Depreciation Charge (2,526)
Depreciation written out
0 To revaluation reserve 0
0 To NCS 0
(7,578) At 31 March 2022 (10,104)
109,167 Opening Net Book value 106,641
106,641 Closing Net Book value 104,115
Page 158

Page 159

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
84
Notes to the Financial Statements
Note 17 – Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the
Council as a result of past events (e.g. computer software and/or software licences) is capitalised
when it is expected that future economic or service benefits will flow from the asset to the Council.
The Council accounts for its software as intangible assets, to the extent that the software is not an
integral part of a particular IT system and accounted for as part of the hardware item of property, plant
and equipment.  The intangible assets include purchased licences. 
Where appropriate, the carrying amount of intangible assets is amortised on a straight line basis. The
amortisation of £0.040m charged to revenue in 2021/22 was charged to Information Services. The
charge to Information Services is then absorbed as an overhead across all the service headings in the
Net Cost of services. It is not possible to quantify exactly how much of the amortisation is attributable
to each service heading. 
The movement on intangible asset during the year was as follows:
Note 18 – Assets Held for Sale
Assets held for sale are those where the carrying amount will be recovered principally through a sale
transaction rather than through continued use.  Before an asset can be classified as held for sale, the
following conditions must be met:
 the asset must be available for immediate sale in its present condition;
 the sale must be highly probable and an active programme to locate a buyer and complete the
plan must have been initiated;
 the asset must be actively marketed for sale at a price that is reasonable in relation to its current
fair value; and
 the sale should be expected to qualify for recognition as a completed sale within one year of
the date of classification.
The Council measures its non-current assets held for sale at fair value at each reporting date.  The
fair value of non-current assets held for sale have been based on the market value approach using
current market conditions and recent sales prices and other relevant information for similar assets in
the West Dunbartonshire area together with evidence across the wider West of Scotland.  Market
conditions are such that similar properties are marketed, purchased and sold actively and the level of
observable inputs are sufficient, leading to the properties being categorised at Level 2 in the fair value
hierarchy.
There were no transfers between Levels 1 and 2 during the year and there have been no changes in
the valuation techniques used during the year for non-current assets held for sale.
2020/21 2021/22
£000 £000
Balance at 1 April 2021
546 Gross carrying amount 667
(371) Accumulated amortisation (396)
175 Net carrying amount at start of year 271
121 Acquisitions in year 400
(25) Amortisation for period (40)
96 Net carrying amount at 31 March 2022 631
Comprising:
667 Gross Carrying amounts 1,067
(396) Accumulated amortisation (436)
271 631
Page 159

Page 160

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
85 
Notes to the Financial Statements 
The movement on assets held for sale during the year was as follows: 
*All assets values listed are in respect of Property, Plant and Equipment 
Note 19 - Heritage Assets 
Heritage assets are both tangible and intangible assets with historic, artistic, scientific, technological,
geographical or environmental qualities, which are held and maintained primarily for their contribution
to knowledge and culture.The authority holds heritage assets of six main types: 
 Models of Ships;
 Works of Art;
 Silver and Commemorative Ware;
 Civic Regalia (Robes and Chains);
 Sewing Machine Collections;  and
 Listed Buildings and Scheduled Ancient Monuments. 
The valuation of these assets held on the balance sheet as detailed below: 
The models of ships, works of art, silver and commemorative ware, civic regalia and sewing machine
collections are the responsibility of the Libraries and Museums Service and accounts for
approximately 90% of the overall collection with the remaining 10% being recorded and accessioned
into the collection on a regular basis in line with museum accreditation.  These works are held at the
following locations: 
 Collections Store, Poplar Road
 Collections Store, Stanford Street; and
 Clydebank Town Hall. 
Models of Ships - include MV Rangitane, MV Essex and HMS Vanguard.   
Works of Art - there are 474 paintings within the works of art collection.   
Civic Regalia - predominately relates to the collection of provost robes and chains of office.  It would
be relatively rare for the authority to purchase, or dispose of, items of civic regalia. 
2020/21 2021/22
£000 £000
8,053 Balance at 1 April 2021 7,755
11 Acquisitions 0
312 Assets previously ommitted 339
Assets newly classified as held for sale:-
357 Property, Plant and Equipment 83
(1,078) Revaluation Losses (71)
702 Revaluation Gains 50
(602) Disposals (3,039)
0 Assets declassified as held for sale* 0
7,755 As at 31 March 2022 5,117
2020/21 2021/22
£000 £000
1,406 Balance at 1 April 2021 1,406
0 Additions/ Disposals / Newly Classified 79
1,406 Balance at 31 March 2022 1,485
Page 160

Page 161

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
86 
Notes to the Financial Statements 
Sewing Machine Collection - there are 813 sewing machines (of various models) included within the
sewing machine collection.   
Listed Buildings and Scheduled Ancient Monuments - the Council holds and maintains listed
buildings and ancient monuments of historic significance, many of which are tributes to the war dead.
As well as memorial structures and buildings, the Council maintains statues and fountains. 
Note 20 – Capital Expenditure and Capital Financing 
The total amount of capital expenditure incurred in the year is shown in the following table (including
the value of assets acquired under finance leases and PPP contracts), together with the resources
that have been used to finance it.  Where capital expenditure is to be financed in future years by
charges to revenue as assets are used by the Council, the expenditure results in an increase in the
capital financing requirement (CFR), a measure of the capital expenditure incurred historically by the
Council that has yet to be financed.  The CFR is analysed in the second part of this note. 
Note 21 – Impairment Losses 
Assets are assessed at the end of each financial year for evidence in impairment or a reduction in value.
Where indications exist and any possible differences are estimated to be material, the recoverable
amount on the asset is estimated and where this is less than the carrying amount of the asset, an
impairment loss is recognised for the shortfall. 
During 2021/22, the Council has recognised impairment losses of £0.221m (2020/21 £1.232m)
relating to non-value adding enhancement of various assets. These impairment losses have been
charged as appropriate within the Comprehensive Income and Expenditure Statement and the
Revaluation Reserve. 
31-Mar-21 31-Mar-22
£000 £000
600,739 Opening Capital Financing Requirement 646,190
Capital Investment
91,392 Property, Plant and Equipment 64,219
91,392 64,219
Less Sources of Finance
1,284 Receipts from Sale of Assets (2,270)
26,210 Government Grants and other Contributions 7,746
(1,284) Transfer to Capital Fund/ Capital Receipts Fund 2,270
8,911 Revenue Contributions 13,247
10,820 Loan Fund Principal Repayments 9,303
45,941 30,296
646,190 Closing Capital Financing Requirement 680,113
0 Increase in Underlying Need to Borrow (Supported) 0
45,451 Increase in Underlying Need to Borrow (Unsupported) 33,923
45,451 Movement in Capital Financing Requirement 33,923
Page 161

Page 162

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
87
Notes to the Financial Statements
Note 22 – Private Finance Initiatives and Similar Contracts
Schools PPP Scheme and Long Term Liability (Design, Build, Finance and Maintain (DBFM)
Scheme)
2021/22 was the thirteenth year of a thirty year public private partnership for provision of three
secondary schools and one primary school in Clydebank and Alexandria.  2021/22 was the fifth year
of a twenty-five year DBFM partnership for the provision of one secondary school in Dumbarton.
The Council has rights to use the schools for core educational purposes between agreed hours. The
contract specifies minimum standards for the services to be provided by the contractor, with
deductions from the fee payable being made if facilities are unavailable or performance is below the
minimum standards.   
The partnership agreement was for the design, build, finance and operation of the schools which
means that the contractor took on the obligation to construct the schools and maintain them in a
minimum acceptable condition and to procure and maintain the plant and equipment need to operate
the schools.  When the agreement ends, after thirty years, unrestricted use and operation of the
buildings will be handed back to the Council at nil cost.
The Termination rights are in line with the market norms reflected in the Scottish Standard Schools
Contract, as approved by the Scottish Government, prior to financial close.
Property, Plant and Equipment
The school buildings are recognised on the Council’s balance sheet within property, plant and
equipment balance.  Movements in their value over the year are detailed in the analysis of the
movement on the Property, Plant and Equipment balance in note 14.
Payments
The amounts payable to the PPP and DBFM operators each year is analysed into five elements:
 fair value of the services received during the year;
 finance cost – an interest charge on the outstanding Balance Sheet liability;
 contingent rent – increases in the amount to be paid for the property arising during contract;
 payment towards the liability – applied to write down the Balance Sheet liability towards the
PPP contractor; and
 lifecycle replacement costs – proportion of the amounts payable posted to the Balance Sheet
as a prepayment and then recognised as additions to property, plant and equipment when the
relevant work is carried out.
Payments remaining to be made under the PPP and DBFM contracts at 31 March 2022 (excluding
any estimation of inflation and availability/performance deductions) are as follows: 
Repayment of
Liability
Interest
Charges
Operating
Costs
Lifecycle
Replacement
Total Unitary
Payment
£000 £000 £000 £000 £000
Less than 1 year 3,370 6,657 3,207 1,332 14,566
2-5 years 15,754 24,083 14,291 5,708 59,836
6-10 years 21,548 23,143 21,410 12,443 78,544
11-15 years 29,911 14,088 25,950 13,001 82,950
16-20 years 20,751 3,194 14,444 7,851 46,240
21-25 years 1,151 36 241 0 1,428
PPP Contractual Liability
as at 31.03.22 92,485 71,201 79,543 40,335 283,564
Page 162

Page 163

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
88
Notes to the Financial Statements
Although the payments made to the contractor are described as unitary charge payments, they have
been calculated to compensate the contractor for the fair value of the services they provide, the
capital expenditure incurred and interest payable whilst the capital expenditure remains to be
reimbursed. The liability outstanding to be paid to the contractor for capital expenditure incurred is as
follows: 
Note 23 – Debtors 
* A further breakdown in relation to local taxation is noted below:
Note 24 - Common Good Fund
The Council administers the Dumbarton Common Good Fund Account. The Fund is applied for the
benefit of the people of Dumbarton. The figures below summarise the income and expenditure for the
year as well as the assets and liabilities as at 31 March 2022. The fund does not represent assets of
the Council and has not been included within the Balance Sheet on page 41.
2020/21 2021/22
£000 £000
99,942 Opening Balance 96,292
0 New Liabilities 0
(3,650) Repayments (3,807)
96,292 Closing Balance 92,485
2020/21 2020/21 2021/22 2021/22
£000 £000 £000 £000
Central government bodies
2,222 Grant Income 4,005
3,840 VAT Recoverable 4,717
4,588 10,650 Other Debtors 2,805 11,527
353 Other local authorities 448
9,364 NHS Bodies 13,867
0 Public Corporations and trading funds 8
Other Entities and individuals
16,430    Arrears of local taxation * 18,026
29,824 46,254 Other Debtors 27,311 45,337
66,620 71,187
Gross debtor
before
impairment Impairment
Net Debtor
after
impairment
Gross debtor
before
impairment Impairment
Net Debtor
after
impairment
£000 £000 £000 £000 £000 £000
5,336 1,673 3,663 Under 1 year 4,709 1,499 3,210
39,180 26,413 12,767 Over 1 year 42,138 27,322 14,816
44,516 28,086 16,430 Total 46,847 28,821 18,026
2020/21 2021/22
Page 163

Page 164

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
89 
Notes to the Financial Statements 
Income and Expenditure Account 
2020/21  2021/22
£000 Expenditure £000
82 Payments to Other Bodies 109
35 Bellsmyre Digital 36
50 Denny Tank 50
40 WD Citizen's Advice Bureau 40
25 General Expenditure 25
232  260 
Income 
(314) Rent – Sites and Offices (320)
(1) Other Income 0
(315)  (320)
(83) Net (surplus)/deficit for year (60)   
(83) In Year Usable Gain/ (Loss) (60)
0 In Year Un-usable Gain/ (Loss) 0
(83)  (60)   
(438) Balance brought forward (521)
(83) In Year Usable Gain (60)
(521) Balance carried forward (581) 
Balance Sheet as at 31 March 2022
2020/21  2021/22
£000 Fixed Assets £000
3,487 Investment properties 3,487 
Current Assets 
534 Investments – West Dunbartonshire Council 586
3 Debtors 3 
Current Liabilities 
(16) Creditors falling due within one year (8)
4,008 Total assets 4,068 
Funds 
3,487 Capital Adjustment Account 3,487
521 General Fund 581
4,008  4,068 
Note 25 – Trust Funds 
The Council acts as sole or custodian trustee for a number of trust funds, which may be used for
various purposes depending on the terms of the Trust.   In all cases, the funds do not represent
assets of the Council and they have not been included within the Balance Sheet on page 38. Under
the provisions of the “2005 Act” and the “Accounts Regulations” above, all registered charities in
Scotland are required to prepare financial statements which must be externally scrutinised. The trust
funds below are registered, under one registration, with the Office of the Scottish Charity Regulator.
Management has reviewed the current arrangements for the trust funds to ensure the current
arrangements reflect the needs of the Council and ensure that all obligations are met.  Responsibility
for the compliance with the new regulations was delegated to the Chief Officer - Resources. 
Page 164

Page 165

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
90
Notes to the Financial Statements
Receipts and Payments Account
Statement of Balances as at 31 March 2022
The Trust Funds hold no liabilities.
Note 26 – Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty
on notice of not more than 24 hours. 
Cash equivalents are investments that mature in three months or less from date of acquisition and
that are readily convertible to known cash amounts, with insignificant risk of change of value. The
investments comprise solely of short term lending of surplus funds to a limited number of pre-
approved UK banks and other local authorities. All deposits are held in sterling. The carrying amount
is the outstanding principal receivable. Bank balances are included in the Balance Sheet at the
closing balance in the Council’s ledger and include cheques payable not yet cashed.
*A further breakdown of the bank account is noted below:
(Surplus)/ (Surplus)/
Receipts Payments Deficit Receipts Payments Deficit
£000 £000 £000 £000 £000 £000
0 0 0 Dunbartonshire Educational Trust Scheme 1962 0 0 0
Endowments amalgamated to form trust
0 0 0 McAuley Prize for Mathematics 0 0 0
Provide prizes for those studying maths & computing
(2) 0 (2) Alexander Cameron Bequest (2) 0 (2)
To encourage and support one-off community activities in Clydebank
0 0 0 Dr A K Glen Fund 0 19 19
Provide outings for Pensioners resident in Dumbarton
0 0 0 UIE Award 0 0 0
For students studying apprenticeships or training in industry
(2) 0 (2) Total (2) 19 17
2020/21 2021/22
Balance as at
1/4/21
(Surplus)/deficit
for year
Balance as at
31/3/22
£000 £000 £000
Bank and Cash
Dunbartonshire Educational Trust Scheme 1962 (90) 0 (90)
McAuley Prize for Mathematics (22) 0 (22)
Alexander Cameron Bequest (118) (2) (120)
Dr A K Glen Fund (24) 19 (5)
UIE Award (25) 0 (25)
Total (279) 17 (262)
31-Mar-21 Movement 31-Mar-22
£000 £000 £000
Net Bank Current Account* (5,234) (4,068) (9,302)
Short term deposits with UK banks 17,475 (6,033) 11,442
Net Cash and Cash equivalents 12,241 (10,101) 2,140
31-Mar-21 31-Mar-22
£000 £000
1,289 Bank Current Accounts in balance 805
(6,523) Bank Current Accounts in overdraft (10,107)
(5,234) Net Bank Current Account* (9,302)
Page 165

Page 166

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
91 
Notes to the Financial Statements 
Note 27 – Financial Instruments 
1) Types of Financial Instrument
Accounting regulations require the “financial instruments” (investment, lending and borrowing of the
Council) shown on the Balance Sheet to be further analysed into various defined categories.   The
investments, lending and borrowing disclosed in the Balance Sheet are made up of the following
categories of “financial instruments”: 
The Council does not have any of the following types of investments or borrowings:
 available for sale financial assets;
 unquoted equity investments at cost;
 financial assets at fair value through profit and loss; or
 financial liabilities at fair value through profit and loss. 
The Council has considered the Code requirements for accounting for financial instruments and the
following events have not taken place in 2021/22:
 reclassification of financial assets carrying value between fair value and amortised cost;
 transfer of financial assets where part or all of the financial assets does not qualify for de-
recognition;
 pledging of financial assets as collateral or liabilities or contingent liabilities, as a result no
carrying or fair value exists;
 recording of impairment losses in a separate account which would require a reconciliation of
changes during the year;
 default on any loans payable during 2021/22;
 breaches of long term loan agreements resulting in the liability being classed as current; or
 offsetting of financial assets and liabilities where a legally enforceable right exists and intent to
settle is on net basis. 
The Council has considered the Code requirements for accounting for financial instruments and the
following disclosures are consistent with the Code:
 current liabilities are recognised as such even if refinanced post balance sheet or original term
greater than twelve months; and
 if the Council has the discretion (contractually) and expects to roll forward current liabilities for
over twelve months, then the obligation can be treated as long term. 
2) Fair Value of Assets and Liabilities carried at Amortised Cost 
Financial assets (represented by lending and receivables) and financial liabilities (represented by
borrowings) and are carried in the Balance Sheet at amortised cost. Fair values have been calculated
with reference to the following: 
31-Mar-21 31-Mar-22 31-Mar-21 31-Mar-22
£000 £000 £000 £000
Debtors
Loans and receivables 22 21 68,955 65,401
Borrowing
Financial liabilities at amortised cost 284,842 307,485 270,383 281,030
Other long term liabilities
PPP and finance leases 92,615 89,115 3,677 3,370
Creditors
Financial liabilities at contract amount 0 0 72,858 78,362
Long-term Current
Page 166

Page 167

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
92 
Notes to the Financial Statements 
Financial Liabilities
 PWLB Loans (Level 2) - For loans from the PWLB, premature repayment rates from the
PWLB in force on 31 March 2022 have been applied to provide the fair value under PWLB
debt redemption procedures. As the Debt Management Office provides a transparent
approach allowing the exit cost to be calculated without undertaking a repayment or transfer it
is appropriate to disclose the exit price. As an alternative, we have assessed the cost of
taking a new loan at PWLB new loan rates applicable to existing loans on Balance Sheet date
(which could be viewed as a proxy for transfer value).
 Non-PWLB loans (Level 2) - For non-PWLB loans payable, the fair value of market loans are
calculated using estimated interest rates of 1.50% which is the average discount rate applied
to market loans for calculation of premature repayment.  The fair value of local council loans
are calculated using estimated interest rates of 0.70% which is the average discount rate
applied to local council loans for calculation of premature repayment.  Discount rates have
been applied to provide the fair value under PWLB debt redemption procedures.
 PFI/Finance leases (Level 3) – These are not the liability of the Council as the debt is held by
the PFI/lease provider.  Fair value have been calculated at level 3 on a simple proxy
basis.  The same NPV methodology has been applied as for PWLB and non-PWLB debt.
Financial Assets
 Fixed or variable short term deposits of less than a year (including MMF's) – Where an
instrument has a maturity of less than 12 months or is a trade or other receivable the fair
value is taken to be the carrying amount or the billed amount.
Policy Type Assets
 Long term debtors – Level 2.
Creditors
 The fair value of trade and other receivables is taken to be the invoiced or billed amount.
Transfers between Levels of the Fair Value Hierarchy
 There were no transfers between input levels 1 and 2 or transfers in or out of level 3 during
the year.
Changes in the Valuation Technique
 There has been no change in the valuation technique used during the year for the financial
instruments: 
The fair value is equal to the carrying amount because all loans and receivables are either short term
or at a fixed interest rate or a variable rate linked to base rate without significant transaction costs. 
The Council does not hold any equity investments in an unquoted market and, therefore, this type of
investment is excluded from the above table. 
Carrying
Amount Fair Value Carrying
Amount Fair Value
£000 £000 Debtors £000 £000
68,977 68,977 Loans and Receivables 65,422 65,422
31-Mar-21 31-Mar-22
Carrying
Amount
Fair Value Carrying
Amount
Fair Value
£000 £000 £000 £000
Borrowing
555,225 736,964 Financial liabilities 588,515 648,513
Other Long Term Liabilities
96,292 153,981 PPP and Finance Lease Liabilities 92,485 136,477
Creditors
72,858 72,858 Financial liabilities at contract amount 78,362 78,362
31-Mar-21 31-Mar-22
Page 167

Page 168

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
93 
Notes to the Financial Statements 
The fair value is higher than the carrying amount because the Council’s portfolio of loans includes a
number of fixed rate loans where the interest rate payable is higher than the rates available for similar
loans at the balance sheet date.   The commitment to pay interest above current market rates
increases the amount that the Council would have to pay if the lender requested or agreed to early
repayment of the loans.  
A further breakdown of types of borrowing held by the Council as at 31 March 2022 is noted below: 
3) Gains and Losses on Financial Instruments 
The gains and losses recognised in the Comprehensive Income and Expenditure Account in relation to
financial instruments are made up as follows: 
* Interest/Expense has been calculated on an EIR basis where appropriate for market instruments. 
There has been no gain/loss on either of the following classes of financial instruments, as the Council
does not own them: 
      available for sale financial assets; and
 financial assets or liabilities at a fair value through profit and loss.
4) Nature and Extent of Risks arising from Financial Instruments 
The Council’s management of treasury risks actively works to minimise the Council’s exposure to the
unpredictability of financial markets and implementing restrictions to minimise these risks.  The
procedures for risk management are set out through a legal framework in the Local Government
(Scotland) Act 2003 and the associated regulations.  During 2021/22 these required the Council to
comply with the CIPFA Prudential Code, the CIPFA Treasury Management in the Public Services 
Principal
outstanding
Accrued
interest / EIR
adjustment
Carrying
amount
Principal
outstanding
Accrued
interest / EIR
adjustment
Carrying
amount
31-Mar-21 31-Mar-21 31-Mar-22 31-Mar-22
£000 £000 £000 £000 £000 £000
485 1,119 1,604 PWLB 11,091 1,289 12,380
0 754 754 Mortgage loans 0 761 761
260,000 322 260,322 Local Authority 257,000 135 257,135
1,181 0 1,181 Other 631 16 647
261,666 2,195 263,861 Short Term Loans 268,722 2,201 270,923
204,365 0 204,365 PWLB 226,268 0 226,268
77,600 1,652 79,252 Mortgage loans 77,600 1,637 79,237
0 0 0 Local Authority 0 0 0
1,181 0 1,181 Other 1,980 0 1,980
283,146 1,652 284,798 Long Term Loans 305,848 1,637 307,485
Financial
Assets: Loans &
receivables
Financial
Liabilities:
amortised cost
Total
Financial
Assets: Loans &
receivables
Financial
Liabilities:
amortised cost
Total
£000 £000 £000 £000 £000 £000
Interest (investment) 165 0 165 81 0 81
Interest payable and similar
charges
Interest/expense* 0 (19,180) (19,180) 0 (17,865) (17,865)
(Gain)/Loss on de-recognition 0 6 6 15 15
Net (Gain)/loss in year 0 (19,174) (19,174) 0 (17,850) (17,850)
31-Mar-21 31-Mar-22
Page 168

Page 169

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
94
Notes to the Financial Statements
Code of Practice and the Local Government Investments (Scotland) Regulations 2010. Overall these
procedures require the Council to manage risk in the following ways:
(i) by formally adopting the requirements of the Code of Practice;
(ii) by the adoption of a Treasury Policy Statement and treasury management clauses within its
financial regulations/standing orders;
(iii) by approving annually in advance prudential and treasury indicators for the following three years
in limiting:
 The Council’s overall borrowing;
 Its maximum and minimum exposures to fixed and variable rates;
 Its maximum and minimum exposures regarding the maturity structure of debt; and
 Its maximum annual exposure to investments maturing beyond a year.
(iv) by approving an investment strategy for the forthcoming year setting out its criteria for both
investing and selecting investment.
These are required to be reported and approved prior to the start of the year to which they relate.  
These items are reported with the annual treasury management strategy which outlines the detailed
approach to managing risk in relation to the Council’s financial instrument exposure.   Actual
performance is reported to Members to assess the effectiveness of controls established.
The 2021/22 annual Treasury Management Strategy which incorporates the prudential indicators was
approved by Council on 22 March 2021 amd updated through the mid-year Strategy by Council on 22
December 2021 and is available on the Council website.   The key issues within the strategy were:
 the authorised limit for 2021/22 was set by Council at that meeting at £855.288m and updated
during the year to £829.832m.  This is the maximum limit of external borrowing;
 the operational boundary was expected to be £774.848m when reported to Council at that
meeting and updated during the year to £760.680m.  This is the expected level of debt during the
year;
 the maximum amounts of fixed and variable interest rate exposure were set at 100% and 50%
based on the Council’s net debt; and
 the maximum exposures to the maturity structure of debt is detailed with refinancing and maturity
risk.
The Council has fully adopted all required CIPFA Codes and statutory regulation currently in force,
and maintains written principles for overall risk management, as well as written policies and
procedures covering specific areas such as credit risk, liquidity risk, refinancing/maturity risk and
market risk.
Credit Risk
Credit risk arises from the short-term lending of surplus funds to banks, building societies and other
local authorities as well as credit exposures to the Council’s customers.  It is the policy of the Council
to place deposits only with a limited number of pre approved UK banks and building societies whose
credit rating is independently assessed as sufficiently secure by the Council’s treasury advisers and to
restrict lending to a prudent maximum amount for each institution.
The Council’s maximum exposure to credit risk in relation to investments in banks and building
societies of £11.442m cannot be assessed on a general basis as the risk of any institution failing to
make interest payments or repay principle sums is specific to each individual institution, however,
recent experience has shown that the institutions invested in at the year end are unlikely to default on
their commitments.  A risk of irrecoverability applies to all of the Council’s deposits but there was no
evidence at 31 March 2022 that this was likely to happen.
The following analysis summarises the Council’s maximum exposure to credit risk on other financial
assets, based on past experience and current market conditions. 
Page 169

Page 170

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
95
Notes to the Financial Statements
The Council does not hold any of the following in relation to financial assets:
 collateral as security in case of default of investment; or
 financial assets that would otherwise be past due or impaired but have been renegotiated.
The council does not generally allow credit for customers, however currently £11.652m is past its due
date for payment. The past due amount can be analysed by age as follows: 
In general, provisions are made in accordance with Code Guidance, whereby a judgement is made
regarding the probability of collection for each category of debt. This judgement is based upon the
past experience of collecting each category of debt to calculate the appropriate percentage of each
debt that may not be eventually recovered. Due consideration has been taken to current position
caused by COVID, however this continues to be monitored. It should be noted that due to the
limitations on the available age analysis of rent arrears, the bad debt provision of this debt is based on
the total value of the debt by tenant, and not by age past due.
No financial assets have been individually determined to be impaired and no collateral is held on past
due or impaired financial assets, therefore the Council has not obtained financial or non financial
assets during the financial year by taking possession of any collateral or calling on other credit
enhancements.
Liquidity risk
The Council manages its liquidity position through the risk management procedures noted above (i.e.
the setting and approval of prudential indicators and the approval of the treasury and investment
strategy reports), as well as through a comprehensive cash flow forecast management system, as
required by the CIPFA Code of Practice.   This seeks to ensure that cash is available when it is
needed.
The Council has ready access to borrowing from the Money Markets to cover any day to day cash
flow need if required.   The Council is required to provide a balanced budget through the Local
Government Finance Act 1992, which ensures that sufficient funds are raised to cover annual
expenditure. On review, at this time there has been little effect on the availability of borrowings due to
COVID. There is, therefore, no significant risk that the Council will be unable to raise finance to meet
its commitments under financial instruments.
Amount at 31.03.22
Historical experience of non-
payment adjusted for market
conditions at 31.03.22
Estimated maximum
exposure to default and
uncollectibility
£000 % £000
Customers and other income 54,980 11.98 1,804
Total
£000
Less than three months 2,032
Three to six months 277
Six months to one year 1,287
More than one year 8,056
11,652
Page 170

Page 171

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
96 
Notes to the Financial Statements 
Refinancing and Maturity Risk 
The Council maintains a significant debt portfolio and whilst the cash flow procedures above are
considered against the refinancing risk procedures, longer term risk to the council relates to managing
the exposure to replacing financial instruments as they mature.   This risk relates to the maturing of
longer term financial liabilities. 
The approved treasury indicator limits for the maturity structure of debt are the key parameters used
to address this risk and the central treasury team address the operational risks within the approved
parameters.  This includes:
 monitoring the maturity profile of financial liabilities and amending the profile as appropriate
through either new borrowing or the rescheduling of the existing debt;  and
 monitoring the maturity profile of investments to ensure that sufficient liquidity is available for the
Council’s day to day cash flow needs. 
The Council has safeguards in place to ensure that a significant proportion of its borrowing does not
mature for repayment at any one time in the future to reduce the financial impact of re-borrowing at a
time of unfavourable interest rates.   No more than 50% of borrowings are due to mature within any
financial year or within any rolling five-year period. 
The maturity analysis of financial liabilities is as follows: 
Market risk
Changes in market interest rates influence the interest payable on borrowings and on interest
receivable on surplus funds invested. For example, a rise in interest rates would mean an increase in
the interest charges on borrowing at variable rates and an increased cost to the taxpayer.   An
increase in interest rates would also mean an increase in the income received on lending at variable
rates and a reduction in cost for the taxpayer. 
Changes in market rates also affect the notional “fair value” of lending and borrowing.   For example,
a rise in interest rates would reduce the fair value of both lending and borrowing at fixed rates. 
Changes in the fair value of lending and borrowing do not impact upon the taxpayer and are confined
to prescribed presentational aspects in the Accounts. 
The Council has a variety of strategies for managing the uncertainty of future interest rates and the
financial impact on the Council:
 it is the policy of the Council to limit its exposure to variable rate borrowing to a maximum of 50%
of what it borrows;
 during periods of falling rates and where it is economically advantageous to do so, the Council
will consider the repayment and restructuring of fixed interest rate debt;
 the Council takes advice from its specialist treasury advisers and actively monitors changes in
interest rates to inform decisions on the lending of surplus funds, new borrowings and
restructurings of existing borrowings; and
 any potential for a financial impact on the Council is also significantly limited by the Scottish
Government’s grant distribution mechanism that automatically adjusts for changes in interest
rates in the government grant support the Council receives for “loan charges”. 
The interest rate profile of the Council’s borrowing is as follows: 
Creditors PPP Borrowing Total
£000 £000 £000 £000
Less than one year 78,362 3,370 281,030 362,762
Between one and two years 0 3,138 56 3,194
Between two and five years 0 12,616 30,407 43,023
More than five years 0 73,361 277,022 350,383
78,362 92,485 588,515 759,362
Page 171

Page 172

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
97
Notes to the Financial Statements
To illustrate the impact of changes in interest rates upon the Council, the following table shows the
financial effect if rates had been 1% higher at 31 March 2022, with all other variables held constant:
The impact of a 1% fall in interest rates would be as above but with the changes being reversed.
Foreign Exchange Risk
The Council does not lend or borrow in foreign currencies and has no exposure to gains or losses
arising from movements in exchange rates.
Note 28 – Creditors 
Note 29 – General Fund and HRA – Reserves and Earmarked Balances
The Council holds reserves on the Balance Sheet in respect of General Fund and HRA brought
forward surpluses:
(1) The General Fund balance stands at £15.020m on 31 March 2022, of which £11.524m is
earmarked for ringfenced purposes, leaving an unearmarked balance of £3.496m (prudential
target £3.123m).
The main earmarked income held for future specific purposes:
£000 %
Fixed Interest Debt 578,408 98.3       
Variable Interest Debt 10,107 1.7        
588,515
£000
Impact on tax payers and rent payers
Increase on interest payable on variable debt borrowings 1
Increase in interest receivable on variable rate investments (81)
Increase in government grant receivable for ‘loan charges’ (41)
Impact on Income and Expenditure Account (121)
Share of overall impact due credited to the HRA (33)
Other accounting presentational changes
Decrease in fair value of fixed rate investments: 0
Decrease in fair value of fixed rate debt borrowings (disclosure
confined to notes to the core financial statements) (74,167)
2020/21 2021/22
£000 £000
13,050 Central government bodies 12,201
25,492 Other local authorities 23,882
920 NHS Bodies 205
0 Public Corporations and trading funds 0
33,396 Other Entities and individuals 42,074
72,858 78,362
Page 172

Page 173

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
98 
Notes to the Financial Statements 
*the earmarked COVID related funding is detailed below: 
(2) The HRA balance is currently £2.734m as at 31 March 2022, of which £1.794m is earmarked for
ring fenced purposes, leaving an unearmarked balance of £0.940m. 
The earmarked balance held for future specific purposes is:- 
Note 30 – Other Reserves 
Reserves are created by appropriating amounts from the General Fund balance in the Movement in
Reserves Statement. When expenditure is financed from a reserve, it is charged to the appropriate
service to score against the Surplus or Deficit on the Provision of Services in the Comprehensive
Income and Expenditure Statement.  The reserve is then appropriated back into the General Fund
balance in the Movement in Reserve Statement so that there is no net effect on council tax. 
Certain reserves are kept to manage the accounting processes for non-current assets, financial
instruments and retirement benefits and that do not represent usable resources for the Council. 
Usable reserves 
Usable reserves are those that the Council is able to apply to fund expenditure or reduce taxation and
comprise of both capital and revenue reserves.  Movement in the revenue reserves during the year
are outlined in the Movement in Reserves Statement, however, a summary is shown below: 
£000
Covid related funding* 6,648        
Change Fund 1,257        
2022/23 budget commitment 1,034        
2020/21 Budget growth items 185           
Young person guarantee 1,018        
Set aside for historic abuse cases 150           
HR/ Legal commitments 210           
Social Welfare Fund 129           
Other Committed Spend (< £0.100m) 893           
11,524      
£000
General COVID Funding
Unspent general COVID funding 3,302
Service Specific COVID Funding
Financial Insecurity 25
Welfare / social support 48
Tenant Grant Fund 54
Winter Support Fund 55
Low Income Pandemic Payment 81
Free School Meal (Easter 2022) 90
Parental Employee Support Fund 114
Winter Hardhsip Fund 125
Local Self Isolation Assistance 182
Scottish Child Payment Bridging Payment 422
Education Recovery 2,150
6,648
£000
Service Improvements 994
Welfare Reform Resilience Reserve 800
1,794
Page 173

Page 174

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
99 
Notes to the Financial Statements 
General Fund Revenue Reserve
The General Fund is held for services provided by the Council through Revenue Support Grant
funded through the Scottish Government and council tax. It excludes the Housing Revenue Account.
This reserve holds funds not yet spent. 
Housing Revenue Account Revenue Reserve
The Council is required by the Local Government and Housing Act (Scotland) 1987 to keep a Housing
Revenue Account (HRA) which records all revenue expenditure and income relating to the provision
of council dwellings and related services. This reserve holds funds not yet spent. 
Capital Receipts Reserves
Capital receipts from asset sales are retained within this Reserve and used to fund planned capital
expenditure. 
Capital Grant and Reserves Unapplied Reserve
Grants and other contributions given to the Council are retained within this Reserve until all conditions
agreed by the grant provider are satisfied. This Reserve is also used to fund transformational projects
from capital receipts. 
Capital Items Replacement Fund (Other)
This reserve holds funds which are retained and used for the renewal or repair of school non-current
assets. 
Capital Reserve
This reserve holds funds which are retained for the funding of the Public Private Partnership (PPP)
unitary charge for schools regeneration on a specific annual phased amount (also known as the
Schools Regeneration Sinking Fund). 
Unusable reserves 
Unusable reserves are those that the Council is not able to utilise to provide services and comprise
of:- 
Capital Adjustment Account
The capital adjustment account absorbs the timing difference arising from the different arrangements
for accounting for the consumption of non current assets and for financing the acquisition,
construction or enhancement of those assets under statutory provisions.  The account is debited with 
31-Mar-21 31-Mar-22
£000 £000
15,028 General Services 15,020
7,364 Housing Revenue Account 2,734
0 Capital Receipts Reserve 30
42 Capital Grants and Receipts Unapplied 42
1,469 Capital Reserve 759
308 Other Reserves 468
24,211 Total Usable Reserves 19,053
31-Mar-21 31-Mar-22
£000 £000
281,297 Capital Adjustment Account 283,933
193,287 Revaluation Reserve 189,840
(163,615) Pension Reserve (55,690)
(4,388) Employee Statutory Adjustment Account (4,100)
(12,163) Financial Instruments Adjustment Account (11,440)
294,418 Total Unusable Reserves 402,543
Page 174

Page 175

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
100 
Notes to the Financial Statements 
the cost of acquisition, construction or enhancement as depreciation, impairment losses and
amortisations are charged to the comprehensive income and expenditure statement (with reconciling
postings to the revaluation reserve to convert fair value figures to a historical cost basis).  The
account is credited with the amounts set aside by the Council as finance for the costs of acquisition,
construction and enhancement. 
The account contains revaluation gains accumulated on property, plant and equipment before 1 April
2007, the date that the revaluation reserve was created to hold such gains. The movement in reserve
statement provides detail of the source of all the transactions posted to the account. 
Revaluation Reserve 
The revaluation reserve contains the gains made by the Council arising from increases in the value of
its property, plant and equipment (and intangible assets).  The balance is reduced when assets with
accumulated gains are: 
 re valued downwards or impaired and the gains are lost;
 used in the provision of services and the gains are consumed through depreciation; or
 disposed of and the gains are realised. 
The reserve contains only revaluation gains accumulated since 1 April 2007, the date that the reserve
was created.  Accumulated gains arising before that date are consolidated into the balance on the
capital adjustment account. 
Pension Reserve 
The pension reserve absorbs the timing differences arising from the different arrangements for
accounting for post employment benefits and for funding benefits in accordance with statutory
provisions.  The Council accounts for post employment benefits in the comprehensive income and
expenditure as the benefits are earned by employees accruing years of service, updating the liabilities
recognised to reflect inflation, changing assumptions and investment returns on any resources set
aside to meet the costs.  However statutory arrangements requires benefits earned to be financed as
the Council makes employer’s contributions to pension funds or eventually pays any pension for
which it is directly responsible. 
2020/2021 2021/2022
£000 £000
267,117 Opening Balance 281,297
(31,146) Depreciation (32,418)
(7,974) Impairment (337)
9,012 Increase in Depreciation Caused by Revaluation 7,746
426 Write off Revaluation Reserve Balance re Disposals 617
(2,167) Disposal of Fixed Assets (3,268)
26,299 Government Grants Applied 7,746
8,911 Capital Financed by Current Revenue 13,247
10,819 Long Term Debt Payment 9,303
281,297 Closing Balance 283,933
2020/2021 2021/2022
£000 £000
153,331 Opening Balance 193,287
63,012 Unrealised Gains on Revaluation of Assets 5,381
(13,618) Impairments and Losses on Revaluation of Assets (465)
(426) Write off Revaluation Reserve Balance re Disposals (617)
(9,012) Depreciation due to Revaluation of Assets (7,746)
193,287 Closing Balance 189,840
Page 175

Page 176

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
101
Notes to the Financial Statements
The debit balance on the pensions reserve therefore shows a substantial shortfall in the benefits
earned by past and current employees and the resources the Council has set aside to meet them. 
The statutory arrangements will ensure that funding will have been set aside by the time the benefits
come to be paid.
Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on
the general fund balance from accruing for compensated absences earned but not taken in the year,
e.g. annual leave entitlement carried forward at 31 March.  Statutory arrangements require that the
impact on the general fund balance is neutralised by transfers to or from this account.
Financial Instruments Adjustment Account
The financial instruments adjustment account absorbs the timing difference arising from the different
arrangements for accounting for income and expenses relating to certain financial instruments and for
bearing losses or benefiting from gains per statutory provisions. The Council uses the account to
manage premiums paid on the early redemption of loans.  Premiums are debited to the
comprehensive income and expenditure statement when they are incurred, but reversed out of the
general fund balance to the account in the movement in reserves statement. Over time, the expense
is posted back to the general fund balance in accordance with statutory arrangements for spreading
the burden on council tax. In the Council’s case, this period is the unexpired term that was
outstanding on the loans when they were redeemed. As a result, the balance on the account as at 31
March 2022 will be charged to the General Fund over the next thirty-six years.
2020/2021 2021/2022
£000 £000
(13,020) Opening Balance (12,163)
851 Annual Write off of Premiums and Discounts 708
0 New Premiums and Discounts 0
6 Annual EIR Adjustment to Stepped Interest Instruments 15
(12,163) Closing Balance (11,440)
Note 31 – Contingent Assets and Contingent Liabilities
A contingent asset arises where an event has taken place that gives the Council a possible asset
whose existent will only be confirmed by the occurrence or otherwise of uncertain future events not
wholly within the control of the Council. Contingent assets are not recognised in the Balance Sheet
but disclosed in a note to the accounts where it is probable that there will be an inflow of economic
benefits.
2020/2021 2021/2022
£000 £000
(134,077) Opening Balance (163,615)
(12,934) Actuarial (Loss)/Gain 140,041
22,566 Employer Contributions 22,765
(39,170) Reversal of IAS19 Entries (54,881)
(163,615) Closing Balance (55,690)
2020/2021 2021/2022
£000 £000
(4,273) Opening Balance (4,388)
(115) Staff Accrual Movement 288
(4,388) Closing Balance (4,100)
Page 176

Page 177

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
102 
Notes to the Financial Statements 
A contingent liability arises where an event has taken place that gives the Council a possible
obligation whose existence will only be confirmed by the occurrence or otherwise of uncertain future
events, not wholly within the control of the Council. Contingent liabilities also arise in circumstances
where a provision would otherwise be made but either it is not probable that an outflow of resources
will be required or the amount of the obligation cannot be measured reliably. Contingent liabilities are
not recognised in the Balance Sheet but are disclosed as a note to the accounts, unless the possibility
of an outflow of resources embodying economic benefits or service potential is remote. 
The Council has a residual contingent liability relating to those workers who have yet to settle their
pay protection claims. 
The Council has a potential contingent liability relating to paid holiday entitlement, with approximately
400 live cases. Following an EU ruling UK employers are bound by employment law in relation to the
definition of paid holiday entitlement. Case law has clarified that all pay elements intrinsically linked to
the performance of a contract of employment should be included in the calculation of holiday pay,
including payments made for additional working. The Council adjusted the method of calculation in
August 2014 (backdated in line with the leave year to April) and has included on-going costs within
the long term financial strategy. The legal position remains subject to challenge however, given the
action taken, any potential claim by employees for any retrospective payments is likely to be minimal.
As a result, whilst recognising there may be such a requirement, it is not possible to quantify such. 
The Limitation (Childhood Abuse) (Scotland) Act 2017 Section 1 removes the limitation period for
actions of damages in respect of personal injuries resulting from childhood abuse. At this stage the
extent of any potential liability is unknown. 
The Council provided West Dunbartonshire Leisure Trust with a letter of comfort to confirm the
Council’s commitment to the ongoing financial sustainability of the Trust, on a joint planning approach
in relation to future service provision through the recovery and beyond. At this stage the extent or
likelihood of any potential liability is unknown. 
A legal ruling in relation to the Goodwin equal treatment case in the Teachers’ Pension Scheme may
have an impact across other public service pension schemes. Scheme rules are to be amended to
ensure the pension entitlement of male survivors within opposite-sex marriages and civil partnerships
are treated in the same way as survivors of same-sex marriages and civil partnerships. The
consequences may impact on future pension contributions rates but initial indications suggest that
any impact would be immaterial. 
The Council is not aware of any other contingent assets or liabilities which may be outstanding. 
Note 32 – Financial Guarantee 
In terms of West Dunbartonshire Leisure Trust’s admission to the Strathclyde Pension Scheme, the
Council has guaranteed to accept liability for any unfunded pension costs should they cease to exist,
withdraw from the Scheme or become unable to meet any unfunded liability. The Council has not
quantified the possible liability. 
The Clydebank Municipal Bank is a company limited by shares with the Council funding any annual
losses incurred.   
Page 177

Page 178

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
103 
Movement on the Housing Revenue Account Statement 
This statement shows the movement in the year on the Housing Revenue Account reserve.  The
surplus or (deficit) on the housing revenue account income and expenditure statement is reconciled to
the surplus or deficit for the year on the housing revenue account balance, calculated in accordance
with the Housing (Scotland) Act 1987. 
2020/21 2021/22 2021/22
£000 £000 £000
(3,924) Balance on the Housing Revenue Account at the End of the Previous Year (1) (7,364)
(8,297) Total Comprehensive Income and Expenditure (2) (1,229)
(637) Pension Scheme Adjustments (1,169)
3 Financial Instruments Adjustment 7
3 Holiday Pay Adjustment 35
(8,521)
Reversal of entries included in the Surplus/Deficit on the Provision of Services in
relation to capital expenditure (11,989)
(9,152) Adjustments to the revenue resource (3) (13,116)
0 Net gain or loss on sale of non-current assets 0
5,019 Statutory Repayment of Debt (Loans Fund Advances) 5,495
8,637 CFCR 13,175
13,656 Adjustments between Revenue and Capital Resources (4) 18,670
4,504 Total Statutory Adjustments (5)=(3)+(4) 5,554
353 Transfers (to)/from Other Statutory Reserves (6) 305
(3,440) (Increase)/Decrease in Year (7)=(2)+(5)+(6) 4,630
(7,364)
Balance on the Housing Revenue Account at the end of the Current Year
(8)=(1)+(7) (2,734)
Page 178

Page 179

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
104 
Housing Revenue Account Income and Expenditure Statement 
The HRA income and expenditure statement shows the economic cost in the year of providing
housing services in accordance with generally accepted accounting practices rather than the amount
to be funded from rents and government grants. The Council charges rents to cover expenditure in
accordance with regulations; this may be different from the accounting cost.  The increase or
decrease in the year, on the basis of which rents are raised, is shown in the Movement on the HRA
Statement. 
2020/21 2021/22 2021/22
£000 £000 £000
Income
(41,544) Dwelling Rents (net of voids) (42,850)
(253) Other Rents (251)
(1,556) Other Income (1,574)
(43,353) (44,675)
Expenditure
8,860 Repairs and Maintenance 12,750
11,750 Supervision and Management 12,680
12,959 Depreciation and Impairment 12,958
433 Other Expenditure 273
34,002 38,661
(9,351)
Net Cost of Service as Included in the Council Comprehensive Income and
Expenditure Statement (6,014)
HRA Share of the Operating Income and Expenditure Included in the
Comprehensive Income and Expenditure Statement
(4,439) Recognised Capital Income (Grants, Contributions and Donations) (969)
0 Gain or Loss on the Sale of HRA Non Current Assets 0
4,953 Interest Payable and Similar Charges 4,717
611 Impairment Loss - Debtors 1,048
(71) HRA Interest and Investment Income (11)
1,054 4,785
(8,297) (Surplus)/Deficit for the year on HRA Services (1,229)
Page 179

Page 180

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
105 
Notes to the Housing Revenue Account Income and Expenditure Statement 
Note 1 - The number and types of dwellings in the Council’s stock
The Council was responsible for managing 10,378 dwellings during 2021/22 (10,153 in 2020/21). The
following shows an analysis of these dwellings by type. 
Note 2 – Dwelling Rents
The £44.223m noted in the Income and Expenditure Statement is the total rental income less voids
chargeable for the year of £1.373m (2020/21 £0.895m).  It excludes irrecoverables and bad debts.
Average rents were £82.88 per week in 2021/22 (£81.50 per week in 2020/21). 
Note 3 –Other Rents
This is the total income received from travelling person site rentals, lock-ups and shops less voids
chargeable for the year, but excludes irrecoverables and bad debts.  Lost rents from lock-ups in
2021/22 were £0.072m (£0.068m in 2020/21). 
Note 4 - Rent arrears
As at 31 March 2022, total rent arrears amounted to £4.027m (2020/21 £3.621m as at 31 March
2021). This is 9.11% of the total value of rents due at 31 March 2022. It should be noted that the total
arrears do not all relate to 2021/22 and the year on year movement in value of arrears is an increase
of £0.406m. 
Note 5 - Provision for Bad Debts
In the financial year 2021/22, the rental bad debt provision has been increased by £0.216m (£0.453m
decrease 2020/21). The provision to cover loss of rental income stands at £2.444m as at 31 March
2022 – equivalent of 62.36% (61.55% 2020/21) of the total value of rents due at that date. 
2020/21 2021/22
Number at
31.03.21
Average
weekly rent
Number at
31.03.22
Average
weekly rent
£ £
Type of Dwelling
2,640 78.05 Two-apartment 2,728 79.47
4,585 80.39 Three-apartment 4,676 81.71
2,583 85.49 Four-apartment 2,616 86.89
330 92.53 Five-apartment 338 94.25
10 106.71 Six-apartment 14 109.23
1 85.69 Seven-apartment 2 86.98
2 94.08 Eight-apartment 2 95.49
2 94.08 Nine-apartment 2 95.49
10,153 Total 10,378
Page 180

Page 181

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
106 
Council Tax Account 
Council Taxpayers: £38.207m (2020/21 £36.765m) 
The Council Tax Income Account (Scotland) shows the gross income raised from council tax levied
and deductions made under Statute.  2021/22 represents the ninth year of operation of the Council
Tax Reduction Scheme in Scotland.  The Council Tax Reduction Scheme represents a discount
introduced across Scotland following the abolition of Council Tax Benefits as part of the UK
government’s welfare reform programme. The resultant total net income within the Council Tax
Account is transferred to the Comprehensive Income and Expenditure Statement. 
The calculation of the council tax base 
The nature and actual amount of each charge fixed   
Discounts, Reliefs and Exemptions
A council tax bill is reduced by 25% where a property has only one occupant or 50% where the property
is empty.  For council tax purposes certain students are not regarded as occupants.  Certain properties
may also qualify for relief if the property has been adapted for a disabled person. Properties undergoing
major renovation or held pending demolition may be awarded exemption from council tax. 
*Council Tax Benefit has been replaced by Revenue Support Grant received from the Scottish Government.  The result of
which has been to reduce the Council Tax Income due by use of a Council Tax Discount Mechanism.
2020/21 2021/22
£000 £000
53,813 Gross council tax 54,277
Less:
(8,884) Council Tax Reduction Scheme Discount* (8,674)
(6,660) Other discounts and reductions (6,745)
(718) Provision for bad and doubtful debts (559)
(786) Adjustments for prior years (92)
36,765 Transfer to General Fund 38,207
Band
No of
Dwellings
No of
Exemptions
Disabled
Relief
Discounts
25%
Discounts
50%
CTRS
Discount
Total
Dwellings
Ratio to
Band D
Band D
Equivalent
A(Disabled) 0 0 21 8 0 11 29 200/360 16
Band A 7,537 389 41 4,338 150 3,996 8,521 240/360 5,680
Band B 16,911 614 (12) 7,950 201 6,174 18,217 280/360 14,169
Band C 7,682 216 0 3,014 37 1,958 7,987 320/360 7,100
Band D 6,108 122 19 2,008 26 736 5,965 360/360 5,965
Band E 4,793 51 (46) 1,096 18 253 4,571 473/360 6,006
Band F 1,755 13 (14) 251 6 24 1,694 585/360 2,753
Band G 840 7 (7) 110 5 3 810 705/360 1,587
Band H 66 0 (2) 5 8 61 882/360 148
43,424
(432)
42,992
Provision for bad debt
Council Tax Base
2020/21 2021/22
Gross Charges £ per year £ per year
Dwellings fall within a valuation band between ‘A’ to
‘H’ which is determined by the Assessor. The council 862.37     Band A 862.37    
tax charge is calculated using the council tax base 1,006.09  Band B 1,006.09 
i.e. band D equivalents. This charge is then decreased/ 1,149.82  Band C 1,149.82 
increased dependent on the band.  The band D charge 1,293.55  Band D 1,293.55 
for 2021/22 was £1,293.55. 1,699.58  Band E 1,699.58 
2,102.02  Band F 2,102.02 
2,533.20  Band G 2,533.20 
3,169.20  Band H 3,169.20 
Page 181

Page 182

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
107
Non Domestic Rates Account
Non-Domestic Rates Income £81.408m (2020/21 £55.963m)
The Non Domestic Rate Account (Scotland) is an agent’s statement that reflects the statutory
obligation for billing authorities to maintain a separate Non Domestic Rates account.  The statement
shows the gross income from the rates and deductions made under Statute.  The net income is paid
to the Scottish Government as a contribution to the national non-domestic rate pool.
Non-Domestic Rates are pooled for Scotland as a whole and redistributed to authorities on a basis
which reflects population.  The Council received £81.408m (2020/21 £55.963m) from the national
pool.  The Council’s allocation from the pool now reflects the Council’s duty to collect Scottish Gas
utilities on behalf of all Scottish councils and this equates to £56.554m in year (£56.515m 2020/21).
The Council’s Revenue Support Grant has been adjusted to compensate for this change.  In 2012/13
the Scottish Government introduced Business Rates Incentivisation Scheme (BRIS), to incentivise
councils to grow their potential business rates tax base and as a result increase rates income, a
proportion of which is to be retained by councils. Following a review of the original BRIS by a joint
Scottish Government/COSLA Review Group the original scheme was suspended and a revised
scheme was introduced in 2014/15. The amount of revised BRIS local targets will be linked only to the
buoyancy element of the total estimated NDRI for any one year. This ensures that each council will
have the ability to influence their own local tax base. Indications suggest the Council should not
receive any additional income for the year 2021/22. 
The amount deemed to be collected locally was £76.850m (2020/21 £72.684m). Due to COVID there
were more reliefs awarded to businesses, thereby reducing the amount collectable.  The sum actually
collected locally and contributed to the pool was £77.258m (2020/21 £70.647m), made up as follows:
The non-domestic rates pool operates on a cash accounting basis and as such the non-domestic rate
income account within the Council is calculated on a similar basis.
2020/21 2021/22
£000 £000
95,490 Gross rates levied 94,019
Less:
(20,223) Reliefs and other deductions (14,830)
(955) Provision for bad and doubtful debts (940)
74,312 Net non-domestic rate income 78,249
(3,706) Adjustments for prior years (1,801)
96 Adjustments for prior years - bad debt 810
70,702 Total Non Domestic Rate Income (before retention) 77,258
(55) Non Domestic Rate Income Retained by the Council (BRIS) 0
70,647 Contribution to National Non Domestic Rate Pool 77,258
55,963 Distribution from National Non Domestic Rate Pool 81,408
14,684 Net contribution to/(from) National Non Domestic Rate Pool (4,150)
55,963
Net Non Domestic Rate Income to Comprehensive Income &
Expenditure Statement 81,408
An explanation of the nature and amount of each rate
fixed
£
184,544,712
(736,797)
183,807,915
743,050
1,500,925
181,563,940 Basic Property Rate for 21/22 - £0.49
Intermediate Property Rate - £0.503
Higher Property Rate - £0.516
The national non-domestic rate poundage set by the First
Minister for Scotland for 2021/22 was:
The amount paid for non-domestic rates is determined by the
rateable value placed on the property by the Assessor
multiplied by the rate per £ announced each year by the
government.
Page 182

Page 183

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
108
Group Accounts
Introduction
The Code of Practice on Local Council Accounting in the United Kingdom (the Code) requires local
authorities to consider their interests in all types of entities. This includes other local authorities or
similar bodies defined in section 106 of the Local Government (Scotland) Act 1973, including statutory
bodies such as Valuation and Concessionary Travel Joint Boards. Authorities are required to prepare
a full set of group accounts in addition to their own council’s accounts where they have a material
interest in such entities. TheCouncil has accounted for its interests in each associate and joint venture
using the equity method of accounting.
Combining Entities
The Group Accounts consolidate the results of the Council with seven other entities:
 Dunbartonshire and Argyll & Bute Valuation Joint Board (VJB);
 West Dunbartonshire Health and Social Care Partnership (HSCP);
 Strathclyde Partnership for Transport (SPT);
 Strathclyde Concessionary Travel Joint Board (SCT);
 West Dunbartonshire Leisure Trust (WDLT);
 Clydebank Property Company (CPC); and
 West Dunbartonshire Energy Limited Liability Partnership (WDE LLP).
In addition to these entities, the Dumbarton Common Good and Sundry Trust Funds have also been
consolidated.
The accounting period for all entities is 31 March 2022.
The Council would class an entity as an associate if they have significant influence over the financial
and operating policies of the entity. The Council would class an entity as a subsidiary if they have
control of the entity. The Council would class an entity as a joint venture where it has contractually
agreed to share control with another party, such as significant decisions require unanimous consent
and the joint ventures have rights to the net assets of the arrangement.
Under accounting standards, the Council includes the results of three of these organisations as
‘associates’ because it has a significant influence over their financial and operating policies (namely
VJB, SPT and SCT). The Council has no shares in, nor ownership of any of these organisations
which are entirely independent of the Council.
The Joint Boards are independent public bodies formed by an Act of Parliament. All local government
functions that relate to these bodies have been delegated from the constituent councils that comprise
the area of each Board. The members of each Board are elected Councillors and are appointed by
the councils in proportions specified by legislation.
The WDLT, CPC, WDE LLP and the Common Good and Trust Funds have been included as
subsidiaries. 
HSCP has been included as a joint venture.
Basis of Combination and Going Concern
The combination has been accounted for on an acquisition basis using the equity method – that is,
the Council’s share of the net assets and liabilities of each entity is incorporated and adjusted each
year by the Council’s share of the entities’ results (recognised in the Group Income and Expenditure
Account), and its share of other gains and losses.
For one of the seven entities, the Council has a share in a net asset. The negative balances on WDE
LLP due to first year losses.
Page 183

Page 184

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
109
Group Accounts
The effects of inclusion of these entities and the Common Good and Trust Funds on the Group
Balance Sheet is to increase reserves and Net Assets by £48.600m – representing the Council’s
share of net assets in these entities.
The Code requires councils to prepare financial statements on a going concern basis.  A transfer
within public services does not negate the presumption that these bodies are still a going concern.
Thus all entities consider it appropriate that their Financial Statements should follow the ‘going
concern’ basis of accounting. Statutory arrangements with the constituent local authorities for the
deficit of the Valuation Joint Board means that the financial position of the Board is assured. 
Whilst the Balance Sheet of some entities show negative total assets, this relates primarily to defined
benefit scheme pension liabilities in these entities.  The financial statements of all individual group
entities have been prepared on a going concern basis and, as such, the group accounts have also
been prepared on this basis.
Page 184

Page 185

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
110 
Group Accounts 
Group Comprehensive Income and Expenditure Statement 
This statement shows the accounting cost in year, of providing services in accordance with relevant
International Financial Reporting Standards, rather than the amount to be funded from taxation.  The
council raises taxation to cover expenditure in accordance with regulations; this may be different from
the accounting cost.  The taxation position is shown in the Movement in Reserves Statement. 
Restated Restated Restated
2020/21 2020/21 2020/21 2021/22 2021/22 2021/22
Gross Gross Net Gross Gross Net
Expenditure Income Expenditure Expenditure Income Expenditure
£000 £000 £000 £000 £000 £000
Service
67,474 (42,014) 25,460 Corporate Services 71,094 (38,250) 32,844
116,417 (17,591) 98,826 Educational Services 125,228 (15,424) 109,804
63,443 (17,620) 45,823 Infrastructure, Regeneration and Economic
Development
60,331 (15,742) 44,589
37,070 (32,922) 4,148 Housing and Communities 39,614 (31,853) 7,761
34,003 (43,354) (9,351) Housing Revenue Account 38,661 (44,675) (6,014)
8,611 (6,117) 2,494 Miscellaneous Services 7,035 (8,501) (1,466)
177,250 (101,678) 75,572 Health and Social Care Partnership 192,216 (107,720) 84,496
2,339 0 2,339 Requisitions 2,517 0 2,517
4,743 (1,269) 3,474 Subsidiaries 7,763 (2,991) 4,772
511,350 (262,565) 248,785 Net Cost of Service (1) 544,459 (265,156) 279,303
883 (Gain) / loss on Disposal of Fixed Assets 998
883 Other Operating Expenditure (2) 998
(36,765) Council Tax (38,207)
(55,963) Non-Domestic Rates (81,408)
(153,086) Revenue Support Grant (133,404)
(26,210) Recognised Capital Income (Grants, Contributions & Donations) (7,746)
(272,024) Taxation and Non-specific Grant Income (3) (260,765)
(115) Interest Earned (31)
19,177 External Interest Payable / Similar Charges 17,868
1,383 Impairment Loss - Debtors 1,101
3,393 Pension Interest Cost/Expected Return on Pension Assets 3,635
23,838 Finance/Investment Income and Expenditure (4) 22,573
1,482 (Surplus)/Deficit on Provision of Services 42,109
(5) = (1)+(2)+(3)+(4)
(7,207) Share of other Comprehensive Income and Expenditure
of Associates and Joint Ventures
(6,614)
(49,793) (Surplus)/Deficit arising from revaluation of property, plant and equipment (4,932)
0 (Surplus)/Deficit on revaluation of available for sale assets 0
15,220 Actuarial (gains)/losses on pension fund assets and liabilities (145,788)
(41,780) Other Comprehensive (Income) and Expenditure (6) (157,334)
(40,298) Total Comprehensive (Income) and Expenditure (5)+(6) (115,225)
Page 185

Page 186

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
111 
Group Accounts 
Group Movement in Reserves Statement 
This statement shows the movement in the year on the different reserves held by the group, analysed into ‘usable reserves’ (i.e. those that can be applied to
fund expenditure or reduce local taxation) and other reserves.  The surplus or (deficit) on the provision of services line shows the true economic cost of
providing the group’s services, more details of which are shown in the Comprehensive Income and Expenditure Statement.  These are different from the
statutory amounts required to be charged to the General Fund balance and the Housing Revenue Account for council tax setting and dwelling rent setting
purposes.  The net increase/decrease before transfer to earmarked reserves line shows the statutory general fund balance and housing revenue account
balance before any discretionary transfers to or from earmarked reserves undertaken by the Council. 
*The transfer of statutory reserves is in relation to dividends paid to the Council by Clydebank Property Company.
WDC Usable
Reserves
Group
Usable
Reserves
Total Usable
Reserves
WDC
Unusable
Reserves
Group
Unusable
Reserves
Total
Unusable
Reserves
Total
Reserves
£000 £000 £000 £000 £000 £000 £000
2021/22
Opening Balance at 1 April 2021 (24,211) (22,542) (46,753) (294,418) (14,064) (308,482) (355,235)
Restatement due to % share in 2020/21 0 99 99 0 166 166 265
Restatement Opening Balance 1 April 2021 (24,211) (22,443) (46,654) (294,418) (13,898) (308,316) (354,970)
Movement in reserve 2021/22
(Surplus) or deficit on provision of services 42,042 67 42,109 (144,958) (5,435) (150,393) (108,284)
Other Comprehensive Expenditure and Income (37,541) (6,693) (44,234) 37,541 (248) 37,293 (6,941)
Net Increase/(Decrease) before Transfers to Other Statutory Reserves 4,501 (6,626) (2,125) (107,417) (5,683) (113,100) (115,225)
Transfers to/from other statutory reserves * 658 46 704 (708) 4 (704) 0
Closing Balance at 31 March 2021 (19,052) (29,023) (48,075) (402,543) (19,577) (422,120) (470,195)
2020/21 (Restated)
Opening Balance at 1 April 2020 (15,834) (13,986) (29,820) (269,078) (16,039) (285,117) (314,937)
Movement in reserve 2020/21
(Surplus) or deficit on provision of services 2,792 (1,310) 1,482 (36,459) 9,709 (26,750) (25,268)
Other Comprehensive Expenditure and Income (11,971) (7,221) (19,192) 11,971 (7,809) 4,162 (15,030)
Net Increase/(Decrease) before Transfers to Other Statutory Reserves (9,179) (8,531) (17,710) (24,488) 1,900 (22,588) (40,298)
Transfers to/from other statutory reserves * 802 (25) 777 (852) 75 (777) 0
Closing Balance at 31 March 2021 (24,211) (22,542) (46,753) (294,418) (14,064) (308,482) (355,235)
Usable Reserves Unusable Reserves
Page 186

Page 187

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022 
112 
Group Accounts 
Group Balance Sheet 
The balance sheet shows the value, as at the balance sheet date, of the assets and liabilities
recognised by the group. The net assets (assets less liabilities) are matched by the reserves held.
Reserves are reported in two categories (page 41 provides a further explanation). 
The unaudited Financial Statements were authorised for issue on 30 June 2022 
Laurence Slavin
Chief Officer - Resources
West Dunbartonshire Council 
30 June 2022
Restated
2020/21 2021/22
£000 £000
1,115,834 Property, Plant and Equipment 1,150,922
282 Intangible Assets 637
28,860 Investment in associates 37,189
22 Long Term Debtors 21
3,703 Long term Investments 3,699
1,406 Heritage Assets 1,485
1,150,107 Total Long Term Assets 1,193,953
7,755 Asset Held for Sale 5,117
1,355 Inventories 1,311
66,490 Short Term Debtors 70,230
15,735 Cash and Cash Equivalents 5,987
91,335 Current Assets 82,645
(3,677) PPP & Finance Lease Liabilities (3,370)
(53) Donated Inventories (76)
(73,107) Short Term Creditors (78,367)
(263,105) Short Term Borrowing (269,917)
(339,942) Current Liabilities (351,730)
901,500 Total Assets less Current Liabilities 924,868
(288) Liabilities in Associates 0
(284,798) Long Term Borrowing (307,485)
(92,615) PPP & Finance Lease Liabilities (89,115)
(459) Provision for liability (463)
(166,842) Net Pensions Liability (55,517)
(1,263) Capital Grants Receipts in Advance (conditions) (2,093)
(546,265) Long Term Liabilities (454,673)
355,235 Total Assets Less Liabilities 470,195
Represented by:
46,753 Usable Reserves 48,075
308,482 Unusable Reserves 422,120
355,235 Total Reserves 470,195
Page 187

Page 188

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
113
Group Accounts
Group Cashflow Statement
The cash flow statement shows the changes in cash and cash equivalents of the group during the
reporting period.  The statement shows how the group generates and uses cash and cash equivalents
by classifying cash flows as operating, investing and financing activities.  The amount of net cash
flows arising from operating activities is a key indicator of the extent to which the operations of the
authority are funded by way of taxation and grant income or from the recipients of services provided
by the authority.  Investing activities represent the extent to which cash outflows have been made for
resources which are intended to contribute to the Council’s future service delivery.  Cash flows arising
from financing activities are useful in predicting claims on future cash flows by providers of capital (i.e.
borrowing) to the group.
The incorporation of the associates and subsidiaries within the group cash flow statement is
immaterial, therefore, no cash flow statement is noted within the Group Accounts.  
The Council’s cashflow is noted on page 42.
Page 188

Page 189

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022 
114 
Group Accounts 
Notes to the Group Accounts 
Note 1 - Details of combining entities 
The notes required for the Financial Statements of the Council are disclosed separately in the
preceding pages. For Strathclyde Partnership for Transport and Concessionary Travel Scheme,
although the Council holds less than 20% voting rights, it has a significant influence on the bodies.
The organisations have voting allocations over 11 other local councils, with no one council holding
majority shares, which ensures that all 12 councils can influence decisions. The following notes
provide material additional amounts and details in relation to the other combining entities. 
Associates and Joint Ventures 
Strathclyde Partnership for Transport is the statutory body responsible for formulating the public
transport policy on behalf of the 12 local authorities in the West of Scotland.  In 2021/22, the Council
contributed £2.188m (2020/21 £2.186m restated) or 3.97% of the Board’s estimated running costs
and its share of the year end net asset of £19.187m (2020/21 £17.817m) is included in the Group
Balance Sheet. Copies of its accounts may be obtained from the Treasurer to the Strathclyde
Partnership for Transport, 131 St Vincent Street, Glasgow G2 5JF. 
Strathclyde Concessionary Travel Scheme Joint Board oversees the operation of the
concessionary fares scheme for public transport on behalf of the 12 local authorities in the West of
Scotland. The costs of the scheme are funded through requisitions from the 12 councils and by the
Scottish Executive via a ‘section 70’ grant. In 2021/22, the Council contributed £0.328m (2020/21
£0.162m), 4.03% of the Board’s estimated running costs and its share of the year end net asset of
£0.185m (2020/21 £0.139m) is included in the Group Balance Sheet. Copies of its accounts may be
obtained from the Treasurer to the Strathclyde Partnership for Transport, 131 St Vincent Street,
Glasgow G2 5JF. 
Dunbartonshire and Argyll and Bute Valuation Joint Board was formed in 1996 at local
government re-organisation by an Act of Parliament. The Board maintains the electoral, council tax
and non-domestic rates registers for the three councils of West Dunbartonshire, East Dunbartonshire
and Argyll and Bute. The Board’s running costs are met by the three authorities, with surpluses and
deficits on the Board’s operations also shared between the councils. In 2021/22, the Council
contributed £0.738m (2020/21 £0.714m) or 25.93% of the Board’s estimated running costs and its
share of the year end net asset of £0.537m (2020/21 £0.288m net liability) is included in the Group
Balance Sheet. Copies of its accounts may be obtained from the Treasurer to the Valuation Joint
Board, 16 Church Street, Dumbarton G82 1QL. 
The West Dunbartonshire Health & Social Care Partnership - the Public Bodies (Joint Working)
Act (Scotland) 2014 sets out the arrangements for the integration of health and social care across the
country. The Scottish Government-approved the Integration Scheme for West Dunbartonshire which
details the ‘body corporate’ arrangement by which NHS Greater Glasgow & Clyde Health Board and
the Council agreed to formally delegate health and social care services for adults and children
(including criminal justice, social work services) to a third body, which is described in the Act as an
Integration Joint Board. The Integration Joint Board for West Dunbartonshire is known as the West
Dunbartonshire Health & Social Care Partnership Board (HSCP Board) and started operations on 1
July 2015. The Board’s running costs are met by the two bodies mentioned above, with surpluses and
deficits on the Boards operations also shared between them. In 2021/22, the Council contributed
£74.925m (2020/21 £70.873m) towards estimated running costs and its share of the year end net
asset of £17.280m (2020/21 £10.904m) is included in the Group Balance Sheet. Copies of its
accounts may be obtained from the Chief Financial Officer to the Integration Joint Board, 16 Church
Street, Dumbarton G82 1QL.  
Page 189

Page 190

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
115
Group Accounts
The Council’s share of its associates and joint ventures are as follows:
Subsidiaries
West Dunbartonshire Leisure Trust was formed in December 2011 and started trading on 5 April
2012. The  Trust is  a charitable  company  registered  in Scotland and provides leisure facilities 
within  the  West  Dunbartonshire  area  to  the  general  public  and  operates sports centres,  leisure
centres, swimming pools,  halls and community education centres owned by the Council.   The Trust
is paid a management fee by the Council for the provision of these services.   The Trust’s net asset at
31 March 2022 was £3.464m (2020/21 £0.036m net asset) and its surplus for the year was £0.099m
(2020/21 £1.034m). The accounts of the Trust are published separately and can be obtained from the
Manager, Leisure Trust Headquarters, Alexandria CE Centre, Alexandria, G83 0NU which is also the
company’s principal place of business.
Clydebank Property Company was part of a group organisation previously known as Clydebank
Rebuilt which was a pathfinder urban regeneration organisation, limited by guarantee and included a
commercial letting company (industrial units) and a registered charity (the Titan Trust). On 11 August
2014, following the transfer of the Titan Crane to the Property Company, the Council bought the
commercial letting company with a view to continuing its regeneration objective. The Company’s net
asset at 31 March 2022 was £3.904m (2020/21 £3.861m) and its surplus for the year before payment
of a dividend was £0.097m (2020/21 £0.699m). The accounts of the Company are published
separately and can be obtained from the Company’s Headquarters, Titan Enterprise, 1 Aurora
Avenue, Queen’s Quay, Clydebank G81 1BF which is also the Company’s principal place of business.
West Dunbartonshire Energy Limited Liability Partnership is a company established in April 2022
and was Scotland’s first large-scale water source heat pump district heating scheme. The ESCo is a
Limited Liability Partnership (LLP) structure and is 99.9% controlled by WDC, with 0.1% being owned
by Clydebank Property Company. Following its first year of inception, the Company has a net liability
at 31 March 2022 of £0.397m funded as working capital advance from the Council. Its deficit for the
year was £0.209m. The accounts of the Company are published separately and can be obtained from
the Company’s Headquarters, 16 Church Street, Dumbarton G82 1QE.
Dumbarton Common Good is held in Trust by the Council. Although the council does not contribute
to this fund financially, it has been included within the Council’s Group through materiality by nature.
Net usable income in 2021/22 was £0.060m (2020/21 £0.083m net usable spend).
Strathclyde
Partnership for
Transport
Strathclyde
Concessionary
Travel Scheme
Joint Board
Dunbartonshires and
Argyll and Bute
Valuation Joint
Board
West
Dunbartonshire
Health & Social
Care Total
£000 £000 £000 £000 £000
2021/22
Surplus/ (Deficit) on  
Operating Activities 285 (46) (63) 6,377 6,553
Non Current Assets 12,767 0 296 0 13,063
Current Assets 7,192 207 258 17,364 25,021
Non Current Liabilities 0 0 0 0 0
Current Liabilities (772) (22) (17) (84) (895)
Restated
2020/21
Surplus/ (Deficit) on 
Operating Activities 350 (110) (60) 6,872 7,052
Non Current Assets 11,438 0 166 0 11,604
Current Assets 7,283 147 233 10,904 18,567
Non Current Liabilities 0 0 (629) 0 (629)
Current Liabilities (904) (8) (58) 0 (970)
Page 190

Page 191

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022 
116 
Group Accounts 
Trust Funds are held in Trust by the Council. Although the Council does not contribute to these funds
financially, they have been included within the Council’s Group through materiality by nature. The net
increase in funds of £0.017m (2020/21 £0.002m) for the Trust Funds. For the purposes of the Group
Accounts, two Trust Funds managed by the Council (Dunbartonshire Educational Trust and McAulay
Prize for Mathematics Trust) have been included pro rata to the Council’s share. Copies of the accounts
may be obtained from West Dunbartonshire Council, 16 Church Street, Dumbarton G82 1QL. 
The Council’s subsidiaries year end results are as follows: 
Note 2 – Non-Material Interest in Other Entities 
The Council has an interest in a number of other organisations. The Council’s share of their net
assets or liabilities is not material to the fair understanding of the financial position and transactions of
the Council. Accordingly, the Group Accounts do not include these organisations. Under Accounting
Regulations, the Council is required to disclose the business nature of each organisation. 
Scotland Excel is a joint committee established through Section 57 of the Local Government
(Scotland) Act 1973.   The main purpose of the committee includes co-ordination of collaborative
buying initiatives, representation of interests in public sector contracts, and the development and
operation of a centre of procurement expertise for Local Government in Scotland. 
Clydebank Municipal Bank is a company limited by shares set up based upon the Companies Act
1908 and 1913. It acts as banker for a number of private individuals/organisations. The Council
provides services to the bank and funds any annual losses incurred.  The bank’s year end is 5 April. 
The principal business of the Municipal Bank is to accept deposits from private account holders and to
invest funds with the Council.  The chairman and directors of the bank are Elected Members of the
Council.  As per the bank’s unaudited financial statements at 31 March 2022, 2,475 accounts were
held with the bank (2020/21 2,474), with a total amount on deposit of £1.658m (2020/21 £1.733m),
with £1.306m being invested with the Council (2020/21 £1.306m).  Interest paid by the Council to the
bank in the year was £0.034m (2020/21 £0.034m). 
Hub West of Scotland is a public private Joint Venture development organisation established in
2012.  They work with the public sector partners to plan, design, build, and fund and maintain
buildings in the most efficient and effective manner delivering better value for money and ultimately
improving public services.  Hub West of Scotland comprises: Hub West Territory Participants, Scottish
Futures Trust and The Wellspring Partnership. 
West
Dunbartonshire
Leisure Trust
Clydebank Property
Company WD Energy LLP Common Good Trust Funds Total
£000 £000 £000 £000 £000 £000
2021/22
Surplus/ (Deficit) on   Operating
Activities 99 63 (209) 60 (17) (4)
Non Current Assets 360 4,376 0 3,487 0 8,223
Current Assets 4,970 391 123 589 184 6,257
Non Current Liabilities 0 (736) (329) 0 0 (1,065)
Current Liabilities (1,866) (127) (3) (8) 0 (2,004)
2020/21
Surplus/ (Deficit) on   Operating
Activities 1,034 194 0 83 2 1,313
Non Current Assets 245 4,373 0 3,487 0 8,105
Current Assets 4,908 415 0 537 201 6,061
Non Current Liabilities (3,227) (732) 0 0 0 (3,959)
Current Liabilities (1,962) (195) 0 (16) 0 (2,173)
Page 191

Page 192

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022 
117 
Group Accounts 
Business Loans Scotland Ltd was formed in March 2017 with 27 Scottish local authorities full
members, including the Council, and the remaining five Scottish local authorities becoming associate
members. In this respect, each member local council provides a level of loan finance for companies in
their area under Phase 1, augmented in Phase 2 by Scottish Growth Scheme and European Regional
Development Funding (ERDF). 
Note 3 – Financial Impact of Consolidation 
The effect  of  inclusion  of  the  entities  on  the  Group Balance Sheet is  to increase reserves and  net
assets by £48.600m (2020/21 £36.606m net asset) respectively representing the Council’s share of the
realisable surpluses/deficits in these organisations. This leaves the group account with an overall net
asset of £470.195m (2020/21 £355.235m). 
Note 4 – Analysis of Material Amounts in Income and Expenditure Account 
The following table provides an analysis of the council’s share of the material amounts as a result of
the inclusion of the associates and subsidiaries. 
Contribution to Group Income and Expenditure Reserve: 
Note 5 - Group Accounting Policies: Disclosure of differences with main Statement of
Accounting Policies 
The financial statements in the Group Accounts are prepared in accordance with the accounting
policies set out in Note 1 on pages 43 to 56 with additions and exceptions noted below: 
Group Income and Expenditure Account 
Proceeds from disposal of fixed assets – profits and losses from the disposal of fixed assets are
credited or debited to the Group Income and Expenditure Account within the net cost of services. The
proceeds are then appropriated out after net operating expenditure. For those proceeds associated
with the disposal of the Council’s assets, appropriation is to the Group Reserves.  For those proceeds
associated with the disposal of associates’ assets, appropriation is to the Group Income and
Expenditure Reserve. 
Group Balance Sheet 
Inventories – valuation methods vary slightly across the Group. The Council uses cost price basis.
The difference in valuation methods does not have a material impact on the results of the group given
the levels of stock held within the organisations; and 
Restated
2020/21 2021/22
£000 £000
17,817 Partnership for Transport 19,187
139 Concessionary Travel Board 185
(288) Valuation Joint Board 537
10,904 West Dunbartonshire Health & Social Care 17,280
(36) West Dunbartonshire Leisure Trust 3,464
3,861 Clydebank Property Company 3,904
0 WD Energy LLP (209)
4,008 Common Good 4,068
201 Trust Funds 184
36,606 Total 48,600
Page 192

Page 193

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022 
118 
Group Accounts 
Pensions – West Dunbartonshire Leisure Trust complies with the Financial Reporting Standard
FRS102 concerning the disclosure of information on pensions. There is no difference in the Profit and
Loss Account by using this method in comparison with IAS19 (which is used by other group entities)
therefore there is no impact on the results of the group.
Page 193

Page 194

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022 
119 
Glossary of Terms 
While much of the terminology used in this report is self explanatory, the following additional
definitions and interpretation of the terms used are provided for assistance.  The Glossary of Terms
does not comprise part of the audited financial statements. 
1.  Employee benefit expenses 
This includes salaries, wages, overtime, bonus, enhancements, pensions, employer’s
national insurance, travelling and subsistence expenses and other staff allowances.
2.  Other service expenses  
This includes:
 property costs (e.g. rent, rates, insurance, repairs and maintenance, upkeep of grounds,
heating and lighting); 
 supplies and services (e.g food, materials, books, uniforms and protective clothing,
purchase/ maintenance of equipment); 
 transport costs (e.g. fuel, repairs and maintenance, tyres, licences, insurance and
procurement of transport for school children); 
 administration costs (e.g. printing and stationery, advertising, postages, telephone costs);
 Payments to Other Bodies (e.g. grants and payments to individuals, organisations and
agencies providing services complementing or supplementing the Council’s work.
3.  Specific Government Grants  
This includes grants received from Central Government in respect of a specific purpose or
service, usually calculated as a predetermined percentage of the expenditure actually
incurred e.g. National Priority Action Fund, Benefits Administration.
4.  General Income  
This includes the charges to persons and bodies for the direct use of council services.
5.  Capital Expenditure  
This is expenditure incurred in creating, acquiring or improving assets where the
expenditure is normally financed by borrowing over a period of years, finance leases, or
utilising the income from the sale of existing assets.
6. Capital Financed from Current Revenue  
This is expenditure incurred in creating, acquiring or improving assets where that
expenditure is charged directly to the revenue account.
7.  Deferred Asset  
The deferred asset represents the net value of the premium paid/discounts received by the
Council on the early repayment of external long term loans.
8.  Useable Capital Receipts Reserve  
The Useable Capital Receipts Reserve represents the capital receipts available to finance
capital expenditure in future years, after setting aside the statutory amounts for the
repayment of external loans.
9.  Pension Interest Cost  
The expected increase during the period in the present value of the scheme liabilities
because the benefits are one year closer to settlement
10. Expected Return of Pension Assets  
The average rate of return expected over the remaining life of the related obligation on the
actual assets held.
11. CIPFA  
Chartered Institute of Public Finance and Accountancy
12. LASAAC  
Local Council (Scotland) Accounts Advisory Committee
13. Budget  
The original revenue budget as set by Members at an appropriate Council meeting.
14. Intangible Assets 
Expenditure on assets such as software licences that do not have physical substance but
are identifiable and controlled by the Council.
15. Revaluation Reserve 
This fund is a store of gains on the revaluations of fixed assets.   It is a reserve held for
technical accounting purposes and is not available for distribution. 
Page 194

Page 195

West Dunbartonshire Council
Draft Statement of Accounts for the Year Ended 31 March 2022
120
Glossary of Terms
16. Capital Adjustment Account (CAA)
This fund is a store of capital resources set aside to meet past expenditure.  It is an account
held for technical accounting purposes and is not available for distribution.
17. Financial Instrument Adjustment Account (FIAA)
This account is used to balance for differences in statutory requirements and proper
accounting practices for borrowing and lending.  It is an account held for technical
accounting purposes and is not available for distribution.
18. Associate Body
An entity other than a subsidiary or a joint venture in which the Council has an interest and
over who’s operating and financial policies the Council is able to exercise significant
influence.
19. Entity
A body that is delivering a service or carrying on a business.  It should have a separate
legal personality and is legally obliged to prepare its own financial statements.
20. Statutory Additions
Additional charges levied for late payment of council tax and non domestic rates.
21. Capital Items Replacement Fund
Reserve earmarked for specific purposes within Education
22. Available for Sale Reserve
Assets that have a quoted market price and/or do not have fixed or determinable payments.
23. Current Service Costs (Pension)
This relates to the real cost of benefit entitlement earned by employees.
24. Past Service Costs/Gains (Pension)
This relates to posts/gains from years prior to the current year and arise from decisions
made in year.   This relates to the capitalised cost of early retirals on efficiency grounds.
25. Curtailments (Pension)
Used to reduce the number of expected years of future service for employees.   In year this
relates to the capitalised cost of early retirals on efficiency grounds.
26. Interest Cost (Pensions)
The amount needed to unwind the discount applied in calculating current service cost.
27. Expected Return on Assets (Pensions)
A measure of the return on the investment assets held by the scheme for the year.
28. Public Private Partnership (PPP)/Public Finance Initiative (PFI)
A contract between the Council and a private organisation for the provision of new
Educational buildings maintenance and related facilities.
29. Available for Sale Assets
These assets are in relation to Financial Instruments and include:
 Equity investments; and
 Other investments traded in an active market.
30. Heritage Assets
An asset with historical, artistic, scientific, technological, geophysical or environmental
qualities which is held for its contribution to knowledge and culture.
31. PPE
Property, Plant and Equipment.
Page 195

Page 196

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
SUMMARY
PERIOD END DATE 31 March 2022
Total Budget Actual Spend Annual
RAG Status
Net Variance
attributable to
covid*
Underlying
Variance
excluding
covid
£000 £000 £000 % £000 £000
Resources 5,448 5,623 175 3%  (46) 221
Regulatory and Regeneration 2,998 2,907 (92) -3%  245 (337)
People & Technology 6,570 6,418 (153) -2%  (5) (148)
Citizens, Culture and Facilities 16,883 16,582 (301) -2%  (44) (257)
Education, Learning and Attainment 108,906 108,777 (129) 0%  1,084 (1,213)
Roads and Neighbourhood 13,543 15,105 1,562 12%  1,046 516
6,353 6,428 75 1%  135 (60)
Supply, Distribution and Property (2,521) 437 2,958 -117%  853 2,105
Miscellaneous Services 10,478 11,026 548 5%  483 65
Loan Charges - net of capital receipts and loans fund holiday 6,159 6,012 (147) -2%  0 (147)
Requisition (VJB) 750 750 0 0%  0 0
Requisition (SPT) 1,632 1,632 0 0%  0 0
Requisition (CJP) 1,694 1,694 0 0%  0 0
Requisition (HSCP) 74,926 74,926 0 0%  0 0
Non GAE Allocation (7,293) (7,293) 0 0%  0 0
Net Covid position 6,460 2,709 (3,751) -58%  (3,751) 0
Total Expenditure 252,987 253,732 745 0%  0 745
Council Tax (37,053) (37,957) (904) 2%  0 (904)
Revenue Support Grant/ NDR (208,445) (208,445) 0 0%  0 0
Covid Funding (in year and earmarked from 2020/21)* (6,460) (6,460) 0 0%  0 0
Use of Reserves (1,028) (1,028) 0 0%  0 0
Total Resources (252,986) (253,890) (904) 0%  0 (904)
Net Expenditure 0 (159) (159) -0.06%  0 (159)
Department Summary Variance
Housing and Employability
Page 196

Page 197

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
RESOURCES SUMMARY
PERIOD END DATE 31 March 2022
Total
Budget
Actual
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 % £000 £000
123 59 (64) -52%  (1) (64)
1,361 1,361 (0) 0%  (1) 1
(341) 35 376 -110%  0 376
2,360 2,401 41 2%  (2) 43
298 283 (15) -5%  (7) (8)
19 (16) (35) -182%  (35) (0)
(790) (828) (38) 5%  0 (38)
Central Administration Support 2,417 2,328 (89) -4%  (1) (88)
5,448 5,623 175 3%  (46) 221
Variance
Service Summary
Service / Subjective Summary
Finance Business Centre
Audit
Revenues & Benefits
Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Page 197

Page 198

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 March 2022
Total
Budget Actual Spend Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 % £000 £000
742 751 9 0  22 (13)
675 566 (109) (0)  47 (156)
72 (7) (79) (1)  (0) (79)
967 839 (128) (0)  2 (130)
452 592 140 0  179 (39)
Economic Development 91 166 75 1  (5) 80
2,998 2,907 (92) (0)  245 (337)
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Democratic and Registration Service
Legal Services
Licensing
Environmental Health
Planning
Page 198

Page 199

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 March 2022
Total
Budget
Actual
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 % £000 £000
696 689 (7) -1%  (0) (7)
1,299 1,277 (22) -2%  (2) (20)
4,266 4,142 (124) -3%  (2) (122)
310 310 0 0%  (1) 1
6,570 6,418 (153) -2%  (5) (148)
Variance
Total Net Expenditure
Transactional Services
Change Support
Information Services
Human Resources (including risk)
Service / Subjective Summary
Service Summary
Page 199

Page 200

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 March 2022
Total
Budget
Actual
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 % £000 £000
345 340 (4) -1%  0 (4)
1,254 1,264 10 1%  (18) 28
296 259 (36) -12%  0 (36)
Clydebank Town Hall 324 282 (43) -13%  5 (48)
Office Accommodation 1,481 1,362 (120) -8%  (53) (67)
Libraries 1,747 1,674 (72) -4%  28 (100)
Arts and Heritage 383 271 (112) -29%  (19) (93)
Catering Services 3,936 3,958 22 1%  0 22
Building Cleaning 1,649 1,695 46 3%  0 46
Building Cleaning PPP (313) (291) 22 -7%  0 22
Facilities Assistants 2,003 1,976 (26) -1%  13 (39)
Facilities Management 358 334 (24) -7%  0 (24)
Leisure Management 3,411 3,450 39 1%  0 39
Events 9 6 (3) -30%  0 (3)
16,883 16,582 (301) -2%  (44) (257)
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy
Page 200

Page 201

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 March 2022
Total
Budget
Actual
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 % £000 £000
Primary Schools 30,892 30,565 (327) -1%  0 (327)
Secondary Schools 29,783 29,627 (156) -1%  287 (443)
Specialist Educational Provision 17,544 18,165 621 4%  787 (166)
Psychological Services 523 468 (55) -11%  0 (55)
Sport Development / Active Schools 629 631 2 0%  0 2
Early Education 8,957 8,966 9 0%  0 9
PPP 14,657 14,738 81 1%  0 81
Creative Arts 630 624 (6) -1%  10 (16)
Curriculum for Excellence 202 201 (1) 0%  0 (1)
Central Admin 2,879 2,827 (52) -2%  0 (52)
Workforce CPD 338 303 (35) -10%  0 (35)
Performance & Improvement 451 420 (31) -7%  0 (31)
Education Development 1,421 1,242 (179) -13%  0 (179)
Raising Attainment - Primary 0 0 0 0%  0 0
Raising Attainment - Secondary 0 0 0 0%  0 0
Pupil Equity Fund (including LAC PEF) 0 0 0 0%  0 0
108,906 108,777 (129) 0%  1,084 (1,213)
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure
Page 201

Page 202

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 March 2022
Total
Budget
Actual
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 % £000 £000
Transport, Fleet & Maintenance Services (563) (413) 150 -27%  56 94
Roads Services 2,791 2,658 (133) -5%  82 (215)
Grounds Maintenance & Street Cleaning Client 7,360 7,360 0 0%  0 0
Outdoor Services 181 176 (5) -3%  0 (5)
Burial Grounds (127) (220) (92) 72%  0 (92)
Crematorium (984) (949) 36 -4%  0 36
Waste Services 7,341 8,434 1,093 15%  835 258
Depots 0 0 0 0%  0 0
Ground Maintenance & Street Cleaning Trading A/c (2,455) (1,942) 513 -21%  73 440
13,543 15,105 1,562 12%  1,046 516
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure
Page 202

Page 203

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 March 2022
Total
Budget
Actual
Spend
Annual
RAG Status
Net
Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 % £000 £000
Working 4 U 4,166 4,123 (43) -1%  0 (43)
Communities 1,110 1,117 7 1%  0 7
Homeless Persons 584 682 98 17%  135 (37)
Private Sector housing 39 42 3 8%  0 3
Anti Social Behaviour 454 464 10 2%  0 10
6,353 6,428 75 1%  135 (60)
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 203

Page 204

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
SUPPLY, DISTRIBUTION AND PROPERTY
PERIOD END DATE 31 March 2022
Total
Budget Actual Spend Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 % £000 £000
Housing Maintenance Trading A/c (1,400) (568) 832 -59%  784 48
Housing Asset and Investment 80 0 (80) -100%  0 (80)
Corporate Assets and Capital Investment Programme (2,285) 89 2,374 -104%  69 2,305
517 429 (88) -17%  0 (88)
(266) (197) 69 -26%  0 69
Private Sector Housing Grants 78 65 (13) -17%  0 (13)
Consultancy Services 755 619 (136) -18%  0 (136)
(2,521) 437 2,958 -117%  853 2,105
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Corporate Asset Maintenance
Procurement
Page 204

Page 205

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
MISCELLANEOUS
PERIOD END DATE 31 March 2022
Total
Budget
Actual
Spend
Annual
RAG Status
Net Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 % £000 £000
8,160 8,720 560 7%  509 51
612 595 (17) -3%  (14) (3)
510 510 0 0%  0 0
1,196 1,201 5 0%  (12) 17
10,478 11,026 548 5%  483 65
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
European Employability
Service Summary
Sundry Services
Members Allowances, etc
Page 205

Page 206

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
Audit 123 59 (64) -52% 
Service Description
Main Issues / Reason for Variance
Central Administration Support 2,417 2,328 (89) -4% 
Service Description
Main Issues / Reason for Variance
Rent Rebates & Allowances (341) 35 376 -110% 
Service Description
Main Issues / Reason for Variance
Environmental Health 675 566 (109) -16% 
Service Description
Main Issues / Reason for Variance
Licensing 72 (7) (79) -110% 
Service Description
Main Issues / Reason for Variance
Legal Services 967 839 (128) -13% 
Service Description
Main Issues / Reason for Variance
31 March 2022
The main reason for the variance is an increase in income.
The Groups within this service (Food and Business Group, Environmental
Pollution Group and Community Health Protection Group) are responsible
for all aspects of Environmental Health work.
This services provides legal advice to the Council
The main reason for the favourable variance is  vacancies and additional
income received.
Budget Details Variance Analysis
Internal audit of council services.
Variance
The main reason for the favourable variance is vacancies and a delay to
filling them.
An increase in discretionary housing payments is causing an adverse
variance in Payments to Other Bodies, this is being partially offset by
additional funding
Resources
This services deals with administration functions within the Authority
The main reason for the favourable variance is  vacancies
This service administers Rent Rebates and other allowances.
Regulatory and Regeneration
The main reason for the favourable variance is reduced employee costs
due to vacancies however this is partially offset by a reduction in
expected income due to Covid 19.
This service provides all licensing on behalf of the Council
Page 206

Page 207

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2022
Budget Details Variance Analysis
Variance
Planning 452 592 140 31% 
Service Description
Main Issues / Reason for Variance
Economic Development 91 166 75 83% 
Service Description
Main Issues / Reason for Variance
Information Services 4,266 4,142 (124) -3% 
Service Description
Main Issues / Reason for Variance
Office Accommodation 1,481 1,362 (120) -8% 
Service Description
Main Issues / Reason for Variance
Arts and Heritage 383 271 (112) -29% 
Service Description
Main Issues / Reason for Variance
This service area provides general ICT support to the Council and also
supports transformational change and modernisation of working practices
through technology
There are three variances within this budget. Supplies and Services is
adverse due to increased Communications Maintenance costs and
increased computer licence costs. This is offset by a favourable income
position and favourable staffing costs due to vacancies.
The main reason for the adverse variance is that income is lower than
budgeted due to cancelled or delayed building projects, due to Covid 19.
Two further variances are occuring with Employee costs favourable due to
staff vacancies and Payments to Other Bodies adverse due a legal case
which was not budgeted.
People & Technology
This Service provides Building & Planning services
Electricity is lower than budget as buildings are not yet open to capacity;
both postages and  the window cleaning contract costs are lower than
budgeted
Provision of Shared Office Accommodation
Citizens, Culture and Facilities
Promotion of regeneration activities within West Dunbartonshire Council
Staffing is adverse due to turnover not being fully achieved, Payments to
Other bodies favourable due to reduced projected outturn for Scheme
Allocation costs and Supplies and Services is adverse due to a projected
shortfall in targeted energy efficiency savings.
The service provides civic accommodation and facilities within Clydebank
The main reason for the variance is that the absence of events has
delayed the need to have certain posts filled and this has offset some of
the income loss.
Page 207

Page 208

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2022
Budget Details Variance Analysis
Variance
Libraries 1,747 1,674 (72) -4% 
Service Description
Main Issues / Reason for Variance
Primary Schools 30,892 30,565 (327) -1% 
Service Description
Main Issues / Reason for Variance
Secondary Schools 29,783 29,627 (156) -1% 
Service Description
Main Issues / Reason for Variance
Specialist Educational Provision 17,544 18,165 621 4% 
Service Description
Main Issues / Reason for Variance
Psychological Services 523 468 (55) -11% 
Service Description
Main Issues / Reason for Variance
This service includes the provision of Library, Culture and Museums within
West Dunbartonshire
The variance is mainly due to reduced costs resulting from the libraries
are not operating to full capacity. In addition, two libraries are closed for
refurbishment.
This service provides Psychological Support to pupils within West
Dunbartonshire.
This service area includes all Secondary Schools.
This service area covers all ASN Services.
The adverse variance is made up of £787k which is covid specific, leaving
£166k favourable as non-covid related. The  variance  within employee
costs is attributable to expenditure offset by Scottish Government grant
income for additional support staff or the pay award element covering the
period January to March 2021. The principal reason for the overall
variance in ASN was the increase in demand for residential placements -
the number of placements up 18% on the previous year.
Covid/recovery funds covered some property costs as well as PPE and
sickness cover . Together with lower exam fees these more than offset
the higher cost of pupil transport.
Education , Learning and Attainment
The favourable variance arose because of a number of retirials during the
year
This service area includes all Primary Schools.
Covid/recovery funds covered some property costs as well as PPE and
sickness cover . Scottish Government funding for additional teachers
assisted with minimising cover costs.
Page 208

Page 209

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2022
Budget Details Variance Analysis
Variance
PPP 14,657 14,738 81 1% 
Service Description
Main Issues / Reason for Variance
Central Admin 2,879 2,827 (52) -2% 
Service Description
Main Issues / Reason for Variance
Education Development 1,421 1,242 (179) -13% 
Service Description
Main Issues / Reason for Variance
Roads Services 2,791 2,658 (133) -5% 
Service Description
Main Issues / Reason for Variance
Transport, Fleet & Maintenance
Services (563) (413) 150 -27% 
Service Description
Main Issues / Reason for Variance
Costs for certain utilities  (principally gas, electricity and rates) , cleaning
and grounds maintenance increased during the year above the level
anticipated when the budgets were set.
Although costs for plant hire and private contractors were greater than
anticipated this was more than offset by increased income
This service relates to Roads design, structures, street lighting, road
safety and school crossing patrols
Roads and Neighbourhood
This service area includes Vale of Leven, Clydebank High and St Peter
the Apostle High Schools and St Eunan's Primary School. The costs
charged to this service are Property costs and the Unitary charge.
The adverse variance is made up of £56k which is covid-related leaving a
variance of £94k which is non-covid related. This arose because certain
internal recharges were lower than expected (eg tyres, fuel)
The reasons for the favourable variance are reduced expenditure on
texting following a review of usage and lower than expected expenditure
to FM for replacements of school kitchen equipment.
Transport services across WDC
This service includes spend in areas such as technician service, language
programmes and senior phase programme.
This service area covers Education Directorate
Employee costs were favourable due to retirals/reduced hours within the
technician service and a variance arose because of lower costs for
vocational transport and lower payments to third parties.
Page 209

Page 210

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2022
Budget Details Variance Analysis
Variance
Burial Grounds (127) (220) (92) 72% 
Service Description
Main Issues / Reason for Variance
Waste Services 7,341 8,434 1,093 15% 
Service Description
Main Issues / Reason for Variance
Ground Maintenance & Street Cleaning
Trading A/c (2,455) (1,942) 513 -21% 
Service Description
Main Issues / Reason for Variance
Homeless Persons 584 682 98 17% 
Service Description
Main Issues / Reason for Variance
Waste Collection and Refuse disposal services
The adverse variance of £1,093k is made up of £835k which is Covid
specific, leaving £258k as non-Covid-related. Employee costs are higher
as projected savings from waste route optimisation ,which depend on
operating from a single depot, have not materialised. In addition, a greater
than budgeted pay award added another £50k to employee costs. Other
Property costs were £53k over budget following essential works at the
recycling centre. Overall commercial income was lower than anticipated.
This service provides burial services within the Council area
Housing and Employability
The adverse variance of £513k is made up of £73k which is Covid-
specific, leaving £440k as non-Covid related. The remaining variance due
to the net pay award within this service being greater than 2% budgeted.
Repairs to existing equipment and purchases of new equipment proved
greater than expected. Income  adhoc works were significantly less than
budgeted
Trading operation providing grounds maintenance and street cleaning
services
The variance is due to income from internments/lairs exceeding budget.
This service seeks to prevent homelessness occurring across the
authority and improves access to support services
Increased number of homeless units were taken on to meet demand
during COVID . The housing benefit (HB) income is slightly less than the
amount required to cover the cost of the additional units
Page 210

Page 211

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2022
Budget Details Variance Analysis
Variance
Housing Maintenance Trading A/c (1,400) (568) 832 -59% 
Service Description
Main Issues / Reason for Variance
Corporate Asset Maintenance (266) (197) 69 -26% 
Service Description
Main Issues / Reason for Variance
Corporate Assets and Capital
Investment Programme (2,285) 89 2,374 -104% 
Service Description
Main Issues / Reason for Variance
Procurement 517 429 (88) -17% 
Service Description
Main Issues / Reason for Variance
Housing Asset and Investment 80 0 (80) -100% 
Service Description
Main Issues / Reason for Variance
The adverse variance is mainly COVID impact that has increased
absence  reduced resource availability, reduced the amount of work
undertaken by the in-house workforce, and increased transport costs to
provide a safe working environment.
The variance is mainly due to the re-negotiation of past rental income due
for the Clydebank Shopping Centre.
This service delivers maintenance and investment services to the
council's housing stock.
This service manages and undertakes repairs and maintenance to public
buildings
Employee costs reported a favourable variance due to vacant posts within
the service and this is partially offset by a reduction in the level of income
being recharged to the Housing Revenue Account.
Supply, Distribution and Property
This service manages and undertakes asset investment for HRA
dwellings
This service provides a purchasing & procurement service for the Council
Main reason for favourable variance is due to vacancies, this is being
partially offset by an anticipated reduction in budgeted income.
The main variance reflects a lower than anticipated throughput of major
capital programmes managed and delivered by the CAMS service.
This service provides asset and estate management
Page 211

Page 212

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2021/22
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2022
Budget Details Variance Analysis
Variance
Consultancy Services 755 619 (136) -18% 
Service Description
Main Issues / Reason for Variance
Sundry Services 8,160 8,720 560 7% 
Service Description
Main Issues / Reason for Variance
Loan Charges - net of capital receipts
and loans fund holiday 6,159 6,012 (147) -2% 
Service Description
Main Issues / Reason for Variance
Council Tax (37,053) (37,957) (904) 2% 
Service Description
Main Issues / Reason for Variance
Net Covid position 6,460 2,709 (3,751) -58% 
Service Description
Main Issues / Reason for Variance
This favourable variance is mainly due to the  interest rates for borrowing
throughout most of 2020/21
This details amounts of income anticipated to be collected from residents
in the form of Council tax
Level of Council Tax charges are anticipated to be higher than budgeted
due to the level of income anticipated following reliefs; the debt write off
through sequistration, etc being less than anticipated and a reduction in
creditors carried forward from 2020/21
Other
This budget covers the servicing of the Council's external borrowing
Miscellaneous
This service area budgets for non departmental specific costs such as
pensions costs, external grants and elderly welfare payments, external
audit fees and insurance costs. The service heading also holds a number
of general savings options which have still to be fully allocated.
Of this variance £483k has been identified as due to covid. The remaining
variance is mainly due to insurance costs anticipated (due to the level of
excesses anticipated) and anticipated property costs of vacant buildings
(HSCP properties).
This service provides the architectural support to WDC
Main reason for favourable variance is due to vacancies
This represents the funding from Scottish Government specifically for
covid and additional spend identified outwith specific  Council Services
The favourable variance is funding service related covid costs, with the
remaining funds carried forward as an earmarked balance
Page 212

Page 213

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2021/2022
PERIOD END DATE
Subjective Summary
Total Budget
2021/22     
£000
Spend to
Date
2021/22 
£000
Actual
Spend
£000
Annual RAG
Status
Employee Costs 6,272 6,068 6,068 (204) -3% 
Property Costs 1,917 1,800 1,800 (117) -6% 
Transport Costs 110 121 121 11 0% 
Supplies, Services And Admin 394 358 358 (36) -9% 
Support Services 2,677 2,485 2,485 (192) -7% 
Other Expenditure 510 715 715 205 40% 
Repairs & Maintenance 12,860 12,581 12,581 (279) -2% 
Bad Debt Provision 1,060 1,131 1,131 71 7% 
Void Loss (Council Tax/Lost Rents) 648 1,635 1,635 987 152% 
Loan Charges 11,878 10,520 10,520 (1,358) -11% 
CFCR 7,821 13,175 13,175 5,354 68% 
Total Expenditure 46,147 50,589 50,589 4,442 10% 
House Rents 44,419 44,223 44,223 196 0% 
Lockup Rents 208 206 206 2 1% 
Factoring/Insurance Charges 1,235 1,268 1,268 (33) -3% 
Other rents 114 117 117 (3) -3% 
Interest on Revenue Balance 71 7 7 64 90% 
Transfer from Reserves 0 4,706 4,706 (4,706) 0% 
Miscellaneous income 100 137 137 (37) -37% 
Total Income 46,147 50,664 50,664 (4,517) -10% 
Net Expenditure 0 (75) (75) (75) 
Forecast Variance 2021/22      
£000               %
31 March 2022
Page 213

Page 214

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2021/2022
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2022
PERIOD 12
Budget Actual
Spend RAG Status
EMPLOYEE COSTS 6,272 6,068 (204) -3% 
Main Issues
Budget Actual
Spend RAG Status
£000 £000 £000 %
PROPERTY COSTS 1,917 1,800 (117) -6% 
Main Issues
Budget Actual
Spend RAG Status
SUPPORT SERVICES 2,677 2,485 (192) -7% 
Main Issues
OTHER EXPENDITURE 510 715 205 40% 
Main Issues
Budget Actual
Spend RAG Status
£000 £000 £000 %
REPAIRS & MAINTENANCE 12,860 12,581 (279) -2% 
Main Issues
Variance Narrative
This budget covers central support recharges to the HRA
Variance Narrative
forecast
Variance
Budget Details
Subjective Analysis
The year end recharge for the use of central support services was lower than anticipated
resulting in a favourable variance.
Variance Analysis
The main reason for this overspend relates to an increase in rent abatement payments in
21/22 with higher costs than anticipated at time of budget setting. 
Service Description
This budget covers all repair and maintenance expenditure to houses and lockups
Budget Details
Subjective Analysis
Variance Analysis
forecast
Variance
Subjective Description
Subjective Description
This budget covers electricity, gas, rates, rents, cleaning  and insurance costs.
Variance Narrative
The main reasons for this underspend relates to the recharge for the cost of property
insurance will be more in line with last year's actual than assumed within budget.  Other
costs also have come in below budget including electricity, gas and contract cleaning.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
The underspend is attributable to a few factors.  Maintenance service contracts have been
obtained at a lower cost than budgeted.  General repairs have been less than budgeted
since the focus has been on dealing with larger jobs which fall under capital budgets rather
than revenue.  It has also not been possible to identify many suitable projects to utilise the
WDTRO budget therefore this budget remains unspent in 21/22.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Subjective Description
This budget covers all employees charged directly to the HRA including caretakers.
Variance Narrative
The main reason for the the favourable varaince is due to recharges to HRA revenue being
lower than anticpated at time of budget setting.
Subjective Description
This budget covers rent abatements, membership fees and tenancy sustainment
Variance Narrative
Page 214

Page 215

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2021/2022
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2022
PERIOD 12
Budget Actual
Spend RAG Status
£000 £000 £000 %
BAD DEBT PROVISION 1,060 1,131 71 7% 
Main Issues
Budget Actual
Spend RAG Status
£000 £000 £000 %
VOID LOSS 648 1,635 987 152% 
Main Issues
Budget Actual
Spend RAG Status
£000 £000 £000 %
LOAN CHARGES 11,878 10,520 (1,358) -11% 
Main Issues
Budget Actual
Spend RAG Status
£000 £000 £000 %
CFCR 7,821 13,175 5,354 68% 
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Subjective Analysis forecast
Variance
Service Description
Loan Charges is made up of repayments of principle sums, and the payments of interest and expenses
Variance Narrative
The main reason for this varaince is the due to the principal repayment being lower than
anticipated at time of budget setting.
Service Description
CFCR is made up of the cost of capital funded from current reserves (CFCR)
Variance Narrative
Variance Narrative
The main reason for this adverse variance relates to the number of void properties being
higher than budgeted.  Despite restrictions being lifted and best efforts to relet properties
towards the end of 20/21, the recovery to normal numbers was not possible.  Therefore,
void numbers are starting higher in 21/22 than assumed within the budget. This is reflected
in a higher cost for void rent loss and void council tax against budget.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Service Description
This budget covers the rents lost on void houses and lockups and the cost of council tax on void properties.
Budget Details Variance Analysis
Service Description
This budget allows for the provision for bad and doubtful debts to be maintained at an appropriate level
Variance Narrative
The Bad Debt Provision required for 21/22 was more than estimated at time of budget
setting, resulting in an adverse variance.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Page 215

Page 216

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2021/2022
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2022
PERIOD 12
Main Issues
Budget Actual
Spend RAG Status
£000 £000 £000 %
INTEREST ON REVENUE BALANCES 71 7 64 90% 
Main Issues
Budget Actual
Spend RAG Status
£000 £000 £000 %
TRANSFER FROM RESERVES 0 4,706 (4,706) 0% 
Main Issues
Service Description
Interest received based upon the balances contained within the revenue account.
Variance Narrative
Budget set too high.  Balances vary year on year, thus making it more difficult to accurately
budget.
The main reason for the adverse varaince is due to higher than expected and an additonal
CFCR from reserves being required in 21/22.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Service Description
Amount transferred from reserves.
Variance Narrative
This favourable variance is due to transfer from reserves, consisting of additonal CFCR
and relase of covid funds in relation to repairs.
Page 216

Page 217

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
PERIOD END DATE
PERIOD 12
Spend to Date Spend to
Date
£000 £000
Red
93 76.2% 174,447 81.9% 93 76.2% 25,301 75.3%
Amber
0 0.0% 0 0.0% 0 0.0% 235 0.7%
Green
29 23.8% 38,551 18.1% 29 23.8% 8,084 24.0%
122 100% 212,998 100% 122 100% 33,620 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Actual
Variance Slippage Over/ (Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
303,599 174,447 305,545 1,945 47,099 25,301 25,301 (21,797) (23,732) 1,935
0 0 0 0 227 235 235 8 0 8
26,934 38,551 42,691 15,757 9,401 8,084 8,084 (1,317) (1,226) (91)
330,534 212,998 348,236 17,702 56,727 33,620 33,620 (23,107) (24,958) 1,851
(330,534) (212,998) (348,236) (17,702) (56,727) (33,620) (33,620) 23,107
0 0 0 0 0 0 0 0
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 March 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of Projects
at RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at RAG
Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Page 217

Page 218

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
Project Life Financials 3 0 0% 3 0 0%
Current Year Financials 3 0 0% 0 (3) -100%
Project Description
Project Manager David Thomson
Chief Officer David Thomson
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 30 0 0% 0 (30) -100%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 50 43 86% 50 0 0%
Current Year Financials 7 0 0% 0 (7) -100%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-22
Requisition ICT Equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project has been delayed due to resources being directed to more prioritised work.  This has affected the forecast end date and works
therefore are rescheduled to 2022/23.  It is hoped that the budget can be utilised with final budget spend forecast in 2022/23.
Mitigating Action
None available at this time.
Anticipated Outcome
Requisition re ICT Equipment.
Anticipated Outcome
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Payment Card Industry Data Security Standard (PCIDSS)
Module would ensure that WDC were compliant with the current requirements of PCIDSS for card
payments without the need for numerous costly workarounds
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The various claim forms and departmental reports have been reviewed and updated and the relevant online request forms were submitted
to the Digital Sub-Group to be converted to Online Achieve Forms.  The various claim forms and departmental reports have now been
converted to Online Achieve Forms and are in the process of being tested. Once complete, the supplier will take matters forward with their
design team. An anticipated timeline for completion of the project, taking into account the various stages i.e. development, testing, going
live etc. will be drawn up in conjunction with the supplier at that time.  Budget spend anticipated in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Upgraded version with PCI compliant telephone payment system.
Electronic Insurance System
Acquisition of a claims/incident management system supported by an electronic document
Budget rephased to 2022-23 as version upgrade of the Council's cash receipting system is required beforehand and is currently underway.
Page 218

Page 219

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 40 5 12% 40 0 0%
Current Year Financials 40 5 12% 5 (35) -88%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 30-Sep-23 30-Sep-23
Project Life Financials 30 5 16% 30 0 0%
Current Year Financials 30 4 15% 4 (25) -85%
Project Description
Project Manager Adrian Gray
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 31-Jul-22
Main Issues / Reason for Variance
Delays in completion of required data cleansing prior to the upgrade have caused the start of the upgrade to be deemed too close to the
financial year end to risk disruption to preparation of the draft final accounts. The upgrade will be delayed until the Summer when the draft
accounts have been completed.
Main Issues / Reason for Variance
Budget rephased to 2022-23 as this is a number of mini projects and the first part is the version upgrade which is actively progressing. After
this upgrade we can move onto other enhancements which are anticipated to finish in September 2023.
Mitigating Action
None possible at this time.
Anticipated Outcome
Development of Agresso system later than originally anticipated but within original budget.
Agresso development
The purpose of this project is to carry out an upgrade of the Agresso Finance System which was last
upgraded in 2015. The requirement to upgrade is to maintain a level of support available from Unit 4
who have advised that support for older versions of the system is being reduced.
Planned End Date Forecast End Date
None required at this time.
Anticipated Outcome
Enhancements to the cash receipting system including PCI compliant telephone payment system.
Upgraded Electronic Insurance System.
Mitigating Action
To enhance the cash receipting system in the way payments are made and allocated to back office
by increasing the level of security that is required for online payments made by customers
Planned End Date Forecast End Date
Enhancements to Cash Receipting System
Page 219

Page 220

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 33 0 0% 33 0 0%
Current Year Financials 33 0 0% 0 (33) -100%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 135 144 107% 144 9 7%
Current Year Financials 119 128 107% 128 9 7%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Oct-21
Project Life Financials 61 3 5% 61 0 0%
Current Year Financials 59 1 1% 1 (58) -99%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-23
Legal Case Management System
Legal Case Management System
Anticipated Outcome
Project to be completed in 2022/23 assuming return to office and with the support of ICT.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget has been rephased from 2020/21.  The project could not proceed as originally planned as Officers are required to access the office
and hardware the system will run on and COVID-19 restrictions have prevented this.  The project will have to go back out to tender
following the upgrade to Microsoft 365.  The project will not be rephased into fincial year 2022/23. 
Mitigating Action
Legal to discuss impact of Microsoft 365 with ICT.
Installation of Solar PV at Clydebank Leisure Centre
Installation of Solar PV at Clydebank Leisure Centre.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Contract strategy to be approved and tenders to be submitted with contract award prior to end of March 2022. Underspend required in
2022/23.
Main Issues / Reason for Variance
Works complete. Awaiting demonstration and handover following snagging issues.
Mitigating Action
Work completed
Anticipated Outcome
Work completed
Solar Panel Installation
Installation of Solar Panels on Council buildings.
Planned End Date Forecast End Date
Mitigating Action
Opportunities to mitigate are limited at this stage.  Officers aim to pass to procurement and tender this financial year.  Aim for works in April
/May 2022.  It is not advisable to undertake roofing works over winter period.
Anticipated Outcome
Complete in 2022/23.
Page 220

Page 221

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 85 0 0% 85 0 0%
Current Year Financials 83 0 0% 0 (83) -100%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 235 237 101% 243 8 3%
Current Year Financials 227 235 103% 235 8 3%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Oct-22
Project Life Financials 290 63 22% 290 0 0%
Current Year Financials 207 0 0% 0 (207) -100%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 28-Feb-23
Anticipated Outcome
Design to be completed in 2021/22 with physical works being carried out in 2022/23.
Replace obsolete boilers (plant greater than 30 years old)
Replace obsolete boilers (plant greater than 30 years old).
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Agreed revised proposals and awaiting new design and costings.
Mitigating Action
None available at this time.
Replace existing main hall Air Handling unit at Clydebank Town Hall
Replace existing main hall Air Handling unit at Clydebank Town Hall.
Leisure Energy projects - air handling units, upgrade lighting, circulating pumps, and draught proofing
Measures to be installed at both Meadow Centre & Vale of Leven Swimming Pool; new pool hall Air
Handling Units, upgrade lighting, circulating pumps Vale of Leven Swimming Pool, internal and
external lighting and draught proofing.
Main Issues / Reason for Variance
All works complete. Retention to be paid FY 22/23. Insufficient funding available for Hub boiler replacement.
Mitigating Action
None available at this time.
Anticipated Outcome
Full spend minus the retention is expected this year. The Hub boiler replacement is suspended until next year. Note insufficient budget
available to carry out Hub works.
Anticipated Outcome
All works to be completed next financial year 2022/23.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Initial contact made with consultancy services. Expect works to commence next financial year.
Mitigating Action
All works to be complete in one tender package.
Page 221

Page 222

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 80 19 23% 80 0 0%
Current Year Financials 77 15 20% 15 (61) -80%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 344 86 25% 344 0 0%
Current Year Financials 344 86 25% 86 (258) -75%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 187 208 111% 208 21 11%
Current Year Financials 72 92 129% 92 21 29%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Aug-21
Main Issues / Reason for Variance
Further orders have been raised and await invoice. Total expenditure this financial year estimated to be £0.015m with the rest of the 
funding to be carried forward into next financial year.
Mitigating Action
None available at this time
Anticipated Outcome
Anticipate some spend this year and the remainder to be rephased into 2022/23.
Energy Projects quick wins
Spend to Save projects.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Development and agreement of projects currently being carried out and one boiler replacement completed FY 21/22. Work planned to be
undertaken next financial year.
Mitigating Action
None available at this time
Zero Carbon Fund
Zero Carbon Fund.
Main Issues / Reason for Variance
Project complete except for minor snagging.
Mitigating Action
None Required.
Anticipated Outcome
Works complete in 2021/22-full spend.
Anticipated Outcome
Project delivered within budget but likely to be later than anticipated.
Oil to Gas Conversion
Oil to Gas Conversion in council buildings.
Planned End Date Forecast End Date
Page 222

Page 223

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 182 248 136% 248 65 36%
Current Year Financials 0 57 0% 57 57 #DIV/0!
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-21 31-Mar-22
Project Life Financials 160 0 0% 160 0 0%
Current Year Financials 80 0 0% 0 (80) -100%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Upgrade obsolete heating controls (BEMS) across Council estate
Upgrade obsolete heating controls (BEMS) across Council estate.
Planned End Date Forecast End Date
Lighting upgrades to LED in schools and Corporate buildings
Lighting upgrades to LED in schools and Corporate buildings
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget was fully utilised in 2020/21.
Mitigating Action
Liaising with Building Services and RPOs for permission to proceed.
Anticipated Outcome
Delivery of project.
Main Issues / Reason for Variance
Completion of tender documentation and strategy end of March 2022. With works commencing April 2022.
Mitigating Action
None available at this time.
Anticipated Outcome
Works complete in 2022/23.
Page 223

Page 224

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 1,188 538 45% 1,188 0 0%
Current Year Financials 1,188 538 45% 538 (651) -55%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 9,797 4,898 50% 9,797 0 0%
Current Year Financials 1,314 346 26% 346 (967) -74%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Progress towards delivery of planned projects from Economic Development Strategy and Charrette Action Plans albeit later than originally
anticipated.
The agreed contribution of £0.475m towards the commercial units has been transferred to the project lead Service, Housing. The marine
technology park at Carless (SMTP) £2m grant has been approved, an agreement is being finalised and the anticipated expenditure is on
track. Design development of Glencairn House underway but spend this financial year was drawn from LUF first, and the Regeneration
Fund contribution of £1M will be carried forward.  Further updates will be provided as the project progresses. Waterfront Path spend will
slip as discussions with landowners continue.
Mitigating Action
Programme management approach to delivery.
Mitigating Action
None available at this time.
Anticipated Outcome
Improved town centres and strategic sites across West Dunbartonshire.
Regeneration Fund
Funding to implement major regeneration projects linked to community charrettes.
Regeneration/Local Economic Development
Budget to facilitate the delivery of Regeneration throughout West Dunbartonshire, aligned to the
Economic Strategy. External funding will be sought to maximise opportunities for redevelopment of
these sites.
Planned End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Forecast End Date
Main Issues / Reason for Variance
Estimated spend in 2021/22 was less than was anticipated for the projects across West Dunbartonshire Town Centres and strategic sites.
Much of this was outwith the Council's control, including for example the development timeline for the Mitchell Way developer, delays to
external funding timescales for Dumbarton  projects, and inter-dependencies with other projects. Forecast has been reduced in relation to
further slippage of LED funding towards Smollett Fountain public realm works as we await confirmation of the programme from the
contractor. £0.650m be carried forward as projects slip into next financial year.
Page 224

Page 225

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 1,166 1,023 88% 1,166 0 0%
Current Year Financials 593 450 76% 450 (143) -24%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 780 139 18% 780 0 0%
Current Year Financials 780 139 18% 139 (641) -82%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Town Centre Fund
Scottish Government funding to help improve local town centres.
Planned End Date Forecast End Date
Mitigating Action
Programme involves  expenditure over a number of projects led by different services. Regular reporting between services will help early
identification of risk.
Anticipated Outcome
Place-based improvements that advance Scottish Government's priorities of 20 min neighbourhoods and carbon zero.
Main Issues / Reason for Variance
Projects in Dumbarton and Clydebank now complete with remaining Town Centre Fund budget to be spent on delivery of the Alexandria
projects.  One of the Alexandria Main Street building works has been completed, the remainder will slip into next year.
Mitigating Action
None available at this time.
Anticipated Outcome
Regenerated Town Centres.
Place Based Investment Programme
Scottish Government Funding to establish a Place-Based Investment Programme to ensure that all
place based investments are shaped by the needs and aspirations of local communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
IRED Committee has approved three projects  Titan Boulevard, Bruce Street public realm and a contribution to the Town Centre projects
the latter proposed spend of £0.061m will slip into next financial year. Titan Boulevard is being delivered by Wheatley Group and we are
advised that it will not be completed until Summer 2022, therefore a further £0.58M will require to be carried forward to 22/23. Roads
Service-led Bruce St project spend anticipated to complete by financial year end.
Page 225

Page 226

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 750 0 0% 750 0 0%
Current Year Financials 750 0 0% 0 (750) -100%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 30-Sep-23
Project Life Financials 747 0 0% 747 0 0%
Current Year Financials 747 0 0% 0 (747) -100%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Dec-22 30-Jun-23
Mitigating Action
Building has been surveyed to get certainty on degree of work required. The funder, Scottish Government, is being updated with progress.
Anticipated Outcome
Viresco Studios and Arts Centre
Viresco Studios and Arts Centre in Alexandria, aimed to encourage wider participation in the arts,
creative enterprises and cultural activity in West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Due to factors outwith the Council's control, progress couldn’t be made on a timeline that would be acceptable to funders and as a result
Scottish Government will withdraw the grant offer. Viresco Studios SCIO currently considering future options with a view to resubmitting an
application.
Repurposing and restoration of B listed former St Andrew's church in Alexandria for community arts uses.
Clydebank Can On The Canal
New activities centre in Clydebank Town Centre.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
New community-run activities centre in Clydebank Town Centre.
Main Issues / Reason for Variance
Kier construction to be appointed with delivery of the Activities Centre by 31 December 2022.
Page 226

Page 227

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 125 56 45% 125 0 0%
Current Year Financials 125 56 45% 56 (69) -55%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 30-Jun-23
Project Life Financials 21,458 21,628 101% 21,628 170 1%
Current Year Financials 0 170 0% 170 170 0%
Project Description
Project Manager Craig Jardine
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-21 31-Mar-21
Queens Quay District Heating Network
Queens Quay District Heating Network.
Forecast End Date
Main Issues / Reason for Variance
Levelling up
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and
transformational regeneration.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This capacity funding was awarded by UK Government to assist with development of LUF bids. WDC will be awarded LUF and the
capacity funding will be used in part to produce Artizan Centre redevelopment options. There is scope for Roads/Transportation to use
some capacity funding to develop a major transportation bid.
Mitigating Action
None available at this time.
Anticipated Outcome
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and transformational regeneration.
Mitigating Action
None required
Anticipated Outcome
Project will be delivered over original budget.
Planned End Date
The energy centre shell is complete and has been handed over to WDC.  The internal fit out is complete with heat now being supplied to
Clydebank Care Home, Aurora House, Titan Enterprise Centre and Clydebank Leisure Centre.  The additional costs resulting in the
reported overspend are associated with extensions to the scope of the project.  Rebate from Energetics of £0.182m has been received
and is being processed. Spend figures are reduced on account of invoice paid by the Wheatley Group for their connection charges to the
district heating network and internal cost transfer to cover media installation and floor painting at the energy centre. 
Page 227

Page 228

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 11,000 0 0% 11,000 0 0%
Current Year Financials 3,600 0 0% 0 (3,600) 0%
Project Description
Project Manager Craig Jardine
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Project Life Financials 34,050 2,681 8% 34,050 0 0%
Current Year Financials 611 444 73% 444 (166) -27%
Project Description
Project Manager Patricia Rowley/ Craig Jardine
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-27 31-Mar-27
Exxon City Deal
As part of the City Deal project the WDC Exxon site at Bowling regeneration with alternative A82
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Regular updates are provided at every Council meeting, with City Deal papers presented at each meeting. The main issues contained
within the new Council's approved Outline Business Case are still valid, which include Exxon's remediation strategy, land transfer
arrangements and issues relating to adjoining owners. Exxon's commercial deal was approved by WDC on the 24th June 2020 with land
transfer agreed and missives concluded.  The planning permission in principle (PPIP) application has been approved by WDC planning
department. Exxon has agreed with SEPA and WDC-Environmental Health their remediation strategy. Technical reviews are being carried
out between WDC consultant Stantec and Exxon consultants WSP to assess the ongoing remediation strategy and site activity and WDC
and Exxon are now working together on their respective construction programmes, to ensure the two phases of works can go ahead
unimpeded by the other. Exxon are independently progressing their remediation works which are ongoing. The planning permission 
conditions are being attended to by consultants Stantec with the condition attached to Dunglass Castle has been progressed with the
condition survey nearing completion taking in the castle, house and Henry bell Obelisk. A verbal presentation was made to the board
members at the September meeting.
Final Business Case submission date changed from November 2021 to November 2022 and was submitted to the Chief Executive's Group
on 29th September 2021 with no issues raised. It was included in the interim performance report presented to cabinet on 5th October
2021. A briefing document has been produced and agreed with our chosen contractor Balfour Beatty. Through the Scape framework we
are moving towards a formal pre construction agreement to allow the detailed design works to commence and the full construction
programme to be developed. Agreements in principle are being drawn up with the majority of 3rd party land owners which will provide a
greater degree of certainty as we move towards reaching an agreement with Balfour Beatty. Due to some consultancy work not awarded
the remaining budget will be carried forward into 22/23.  
Main Issues / Reason for Variance
Network expansion to GJNH (Golden Jubilee National Hospital) will commence pending approval to proceed by the GJNH Board.  The
budget of £3.6m will be rephased into 2022/23 on account of the continuing discussions and expected future confirmation by the GJNH
board approving the connection proposal to the Queens Quay District Heating Network.
Mitigating Action
None available at this time.
Anticipated Outcome
Project will be delivered on budget.
District Heating Network Expansion
District Heating Network Expansion.
Planned End Date Forecast End Date
Mitigating Action
None required.
Anticipated Outcome
Delivery of the project on time and within the increased budget.
Page 228

Page 229

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 15 4 24% 15 0 0%
Current Year Financials 15 4 24% 4 (11) -76%
Project Description
Project Manager Stephen Daly
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 421 230 55% 421 0 0%
Current Year Financials 278 86 31% 86 (191) -69%
Project Description
Project Manager David Main
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
Chief Officer requested carry forward following completion schedule updates for Alexandria and Dalmuir Libraries improvement works.  An
allocation of funds for furniture at Alexandria Library will now be carried into 22/23, and for Dalmuir Library into 23/24. Furniture
replacement for Dumbarton, Duntocher, Faifley and Parkhall Libraries is anticipated to still complete in 21/22.
Mitigating Action
Carry forward of funds to 22/23 and 23/24.
Anticipated Outcome
Project carried forward to align with Asset Management programme.
To improve Housing Repairs telephone platform for incoming calls, providing improved Management
Anticipated Outcome
Review of service requirements & telephony functionality will inform works to improve citizen experience.
To improve performance and efficiency of Council's Libraries and Cultural Services.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project was rephased from 2020/21 into 2021/22.  Works were scoped with ICT in previous year but delayed due to COVID-19 lockdown
and prioritising of support for critical services by both ICT and Citizen Services.  Project progressed in 2021/22 with contractor appointed to
carry out initial script upgrades which commenced June 2021.  The project will continue into FY 22/23 with the budget being carried
forward.
Mitigating Action
None required.
Transformation of Infrastructure Libraries and Museums
Main Issues / Reason for Variance
Telephone System Upgrade
Page 229

Page 230

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 4,014 1,187 30% 4,014 0 0%
Current Year Financials 2,550 875 34% 875 (1,676) -66%
Project Description
Project Manager Sarah Christie/Michelle Lynn
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 500 523 105% 523 23 5%
Current Year Financials 0 23 0% 23 23 0%
Project Description
Project Manager Michelle Lynn
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-21 30-Nov-20
Heritage Capital Fund
Heritage Capital Fund.
Anticipated Outcome
Project to be delivered on budget and within revised timescale.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The original projected spend has been affected by internal and external delays due to the Covid 19 recovery, a reduction in the scope of
the Clydebank Town Hall project, a change in the delivery date for the Clydebank Museum at Clydebank Library during the contract award
stage, while the new Dalmuir Library and Gallery had to be rescheduled for approval in August 2021. Officers are now making progress to
get projects back on track, projects will still be delivered in full, and a review of optimism bias will be undertaken in the projections for
2022/23.
Mitigating Action
None available at this time.
Upgrade of Clydebank Library
Refurbishment of the existing Clydebank Library to deliver a fit for purpose modern library designed
around the needs of the customer. This will protect a historic landmark and the original Carnegie
library whilst offering the potential to build upon the development of a ‘cultural quarter’ focused around
Clydebank Town Hall.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Charge for ICT work carried out at Clydebank Library which had been delayed due to Covid.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered.
Page 230

Page 231

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 5,050 113 2% 5,053 3 0%
Current Year Financials 110 113 103% 113 3 3%
Project Description
Project Manager Michelle Lynn/ Sarah Christie
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
Project Life Financials 40 0 0% 40 0 0%
Current Year Financials 40 0 0% 0 (40) -100%
Project Description
Project Manager John Anderson
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-22 31-Mar-23
Main Issues / Reason for Variance
The Business Case for the Glencairn House project was outlined in a report to the IRED committee on 21 August 2019. The report sought
and received approval to proceed with the project.  Architects have been appointed and the initial development stage has now been
completed. Planning submission has been targeted for Spring 2022 with a practical completion date of December 2023 and financial
completion by December 2024 due to retentions. Levelling Up Funding has been confirmed and will be reported separately under a
different budget line.
Mitigating Action
None available at this time.
Anticipated Outcome
Re-development of Glencairn House in Dumbarton High Street to a purpose built library and museum, within budget albeit later than
originally anticipated.
Glencairn House
Re-development of Glencairn House in Dumbarton High St to a purpose built library and museum.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
New floor fitted in Alexandria Community Sports Hall.
Alexandria Community Centre Sports Hall re-flooring
Alexandria Community Centre Sports Hall re-flooring
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This project was rephased from 2020/21 as The Alexandria Community Centre Sports Hall was being utilised as COVID-19 vaccine centre
so works were unable to be carried out in 2020/21.  The centre continued to be used as a vaccine centre and the work has been be
postponed until next financial year.
Page 231

Page 232

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 22,051 22,068 100% 22,068 17 0%
Current Year Financials 0 17 0% 17 17 0%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-20 31-Mar-20
Project Life Financials 8,535 119 1% 8,535 0 0%
Current Year Financials 160 0 0% 0 (160) -100%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-25 31-Mar-25
Project Life Financials 1,603 2,262 141% 1,603 0 0%
Current Year Financials 1,603 2,262 141% 2,262 659 41%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-22
None available at this time.
Office Rationalisation
Delivery of office rationalisation programme.
Mitigating Action
Planned End Date Forecast End Date
Main Issues / Reason for Variance
New Dumbarton Office has been opened to staff from 21 May 2018. Final Retention for demolition of Garshake works was due to be paid
in 2020/21 however retention has now been paid in April 2021.  Forecast overspend is due to unforeseen additional charges. 
Main Issues / Reason for Variance
Given potential implications around operational service requirements for Greenspace, Transport, Roads and Waste,  Officers have not
been in a position to complete the Depot Rationalisation Business Case at this point.  A review of the scope of the project is currently
underway and development of a brief is required to go out to market and this will not be in place prior to the end of this financial year.  The
intention would be to bring a business case to IRED Committee Summer/Autumn 2022.  Re-phase £0.160m to financial year 2022/23. 
Mitigating Action
None available at this time.
Anticipated Outcome
Project business case will be brought back to project board and Council.
Anticipated Outcome
Project delivered at a higher cost than budgeted.
Depot Rationalisation
Depot Rationalisation.
Planned End Date Forecast End Date
Anticipated Outcome
Full budget spent pluse acceleration from FY 22/23
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing and a request for FY 22/23 budget acceleration was agreed due to a number of health and safety requirements.
Mitigating Action
None available at this time.
Building Upgrades and H&S - lifecycle & reactive building upgrades
Lifecycle and reactive building upgrades.
Page 232

Page 233

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 350 9 3% 350 0 0%
Current Year Financials 341 1 0% 1 (341) -100%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 344 382 111% 382 38 11%
Current Year Financials 0 38 0% 38 38 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-21
Project Life Financials 150 16 11% 150 0 0%
Current Year Financials 134 1 1% 1 (134) -99%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-23
New Sports Changing Facility Dumbarton West (Old OLSP site) 
New Sports Changing Facility Dumbarton West (Old OLSP site) 
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
New sports changing facility completed.
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
New Sports Changing Facility at Duntocher
New Sports Changing Facility at Duntocher
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project completed over budget due to ground conditions on site.  Final costs now charged and project reporting an overspend of £0.038m.
Main Issues / Reason for Variance
Planning permission has been submitted.  New build will be in conjunction with developers site and awaiting confirmation of a start date.
Project cannot commence until planning application has been approved and delays on application and granting has been in relation to
discussions with the adjacent developer and consultation with roads in relation to onsite parking and impact on adjacent site.  Following
granting of planning permission a timeline will be issued and a further update provided.  Therefore the budget will be rephased to 2022/23.
Mitigating Action
None available at this time.
Anticipated Outcome
To deliver new sports changing facility.
Anticipated Outcome
To deliver new sports changing facility.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project had been delayed due to a number of COVID-19 related issues and utilities issues.  Unit is now in production but delay to site due
to the utility disconnection and demolition works.  Project to be rephased to 2022/23.
Mitigating Action
None available at this time.
Page 233

Page 234

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Page 234

Page 235

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 750 664 89% 750 0 0%
Current Year Financials 86 1 1% 1 (86) -99%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 675 85 13% 675 0 0%
Current Year Financials 610 20 3% 20 (590) -97%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-24
Main Issues / Reason for Variance
Planning was granted December 2020 and fabrication of metal work to be completed by March 2022. Previous delays were due to a
number of COVID-19 level 4+ restrictions contractors unable to be onsite and complete works. Ground works on site March 2022 and
expect the work to be completed during FY 22/23.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered on budget.
Holm Park & Yoker Athletic FC
Develop a new 3G pitch to act as a home venue for Clydebank FC with extensive community access.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
New build community facility.
New Westbridgend Community Centre
New Westbridgend Community Centre
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planning Permission received and currently working on internal room layouts to confirm overall budget required to complete project. 
Previous delays, include application for planning permission which Officers elongated due to requirement to go to design panel, and delays
in additional information being able to be provided to Planning due to site visits not being able to be carried out because of COVID-19
restrictions.  Currently room layouts are being discussed with the group, this will then allow a review of costs to minimise the additional
budget required to complete the project.  The original budget allocation did not take into account ground condition costs and any
implications required following discussions with planning – until this process is complete Officers will not be able to request additional
budget.  At this time it is estimated that only £0.025m of the budget will be required this year with £0.585m required to be rephased to
2022/23.  Balance of budget was presented to Council on 9th March 2022 and approved however Officers have been asked to prepare a
report on the project to a future meeting of the Council.
Page 235

Page 236

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 78 0 0% 78 0 0%
Current Year Financials 78 0 0% 0 (78) -100%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 45 0 0% 45 0 0%
Current Year Financials 45 0 0% 0 (45) -100%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 912 832 91% 915 3 0%
Current Year Financials 41 51 124% 51 10 24%
Project Description
Project Manager Elaine Troup
Chief Officer Peter Barry
Project Lifecycle 31-Mar-23 31-Mar-23
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Changing demand means it has not been possible to purchase equipment to date. Further analysis is being carried out of future demand to
allow an informed decision to ensure the correct equipment is identified.  
Mitigating Action
None available at this time.
Purchase of 3 Welfare Units
At Council meeting on 30th August 2017 it was agreed to purchase 3 Welfare Units as a spend-to-
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve
coordinated service delivery in response to community need. This is complimented by community
capacity building, empowering WD citizens to do more for their own communities (leading to less
reliance on council).  Also included is the implementation of participatory budgeting to support and
build capacity in communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The project remains on schedule with a number of larger value grants expected to be drawn down over the winter months.
Main Issues / Reason for Variance
It is anticipated that spend will be achieved in Financial year 2022/2023.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within budget.
Anticipated Outcome
Project delivered within budget.
Elevated Platforms (Building Services)
Elevated Platforms (Building Services).
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Full spend on this year's budget.
Page 236

Page 237

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Page 237

Page 238

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 225 0 0% 225 0 0%
Current Year Financials 25 0 0% 0 (25) -100%
Project Description
Project Manager John Kerr
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
Project Life Financials 489 534 109% 489 0 0%
Current Year Financials 489 534 109% 534 45 9%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 400 44 11% 400 0 0%
Current Year Financials 370 13 4% 13 (357) -96%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Dec-22
Dennystoun Forge Site Improvements
Dennystoun Forge Site Improvements
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Better access with parks, cemeteries and open spaces.
Allotment Development
To develop an allotment site.
Public non-adopted paths and roads
Upgrades to drainage and lighting to enhance the lifespan of paths and roads within  facilities in public
parks, cemeteries and civic spaces.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects are currently being developed to deliver better access in our parks, cemeteries and open spaces. Full budget spent in 2021/22.
Main Issues / Reason for Variance
Project was initially stalled due to COVID-19 restrictions, however as these are easing Officers have now carried out a consultative
exercise and initiated a site inspection to develop the work programme. No work has started yet.
Mitigating Action
Officers carried out some proactive consultative work to establish the tenant priorities this will allow the work programme to be developed
Anticipated Outcome
It is expected the works programme for 2022/23 be delivered within Quarter 1.
Anticipated Outcome
3 new allotment sites with 150 plots.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
A Site investigation report has identified that Townend Road can only be developed with raised beds. The project will now be developed on
this basis and officers will work to the available budget. Sites at Dillichip Loan and Dumbarton Common are also being considered for
development as food growing sites. Site investigation work and some ground clearance work to be carried out in FY 21/22 and the project
will be completed in FY 22/23.
Mitigating Action
None available at this time.
Page 238

Page 239

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 472 406 86% 472 0 0%
Current Year Financials 66 0 0% 0 (66) -100%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 1,726 1,713 99% 1,726 0 0%
Current Year Financials 23 10 43% 10 (13) -57%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 50 37 73% 50 0 0%
Current Year Financials 50 37 73% 37 (13) -27%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Main Issues / Reason for Variance
Spend on this budget is dependant on community sports groups developing and delivering projects. COVID-19 has resulted in this process
being delayed and spend has not been achieved in 2021/22.
Mitigating Action
Work with groups to support project development.
Anticipated Outcome
New community sports facilities.
Community Sports Fund
Match funding of up to 75% for local sports clubs to develop business cases to improve facilities.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget will be used to develop an area of the existing Cemetery for additional burials.  Project scope has now been developed and will
be tendered under the minor civils framework.  Some budget spend anticipated in 2021/22 with remaining budget rephased into 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Improvements to the environment of West Dunbartonshire.
Kilmaronock Cemetery Extension
Extension of existing cemetery at Kilmaronock. 
Environmental Improvement Fund
This fund has been created to deliver environmental improvement projects for communities
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Remaining budget rephased from 2020/21 to progress with tree planting in 2021/22 in line with the Councils Climate Change and
Biodiversity action plans.
Anticipated Outcome
Sustainable burial environment for local residents.
Page 239

Page 240

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 4,148 4,233 102% 4,233 85 2%
Current Year Financials 102 187 183% 187 85 83%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 1,802 2,366 131% 2,366 564 31%
Current Year Financials 1,401 1,966 140% 1,966 564 40%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
Posties Park Sports Hub - New sports hub to include Gym & running track
Creation of a sports hub at Posties/Marinecraft to include a new changing pavilion/Gym, new all-
weather 6 lane running track, conversion of blaze sports pitch to grass, new fencing, upgrade of
existing floodlights and additional car parking.  This combines the budget approved by the Council in
February 2015 for Community Sports Facilities at Posties Park, draw down of budget from the
generic sports facilities budget line. No match funding from Sport Scotland was received.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project start was delayed due to planning issues and COVID-19 restrictions. Work commenced January 2021 with a proposed completion
date of March 2022 which has been extended to August 2022 due to design changes required by Planning.
Main Issues / Reason for Variance
Project has been extended due to COVID-19.  Overspend anticipated.
Mitigating Action
None required at this time.
Anticipated Outcome
Restoration of Levengrove Park.
Levengrove Park - Restoration & Regeneration
Restoration and Regeneration of Levengrove Park.
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
New all weather running track and gymnasium.
Page 240

Page 241

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 817 263 32% 817 0 0%
Current Year Financials 652 99 15% 99 (553) -85%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 30-Sep-22
Project Life Financials 642 682 106% 682 39 6%
Current Year Financials 0 40 0% 40 40 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-20 31-Dec-19
Project Life Financials 106 84 79% 106 0 0%
Current Year Financials 106 84 79% 84 (22) -21%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Mitigating Action
None required at this time.
Anticipated Outcome
Renewal of Play park
Vale of Leven Cemetery Extension
Extension of existing cemetery in Vale of Leven.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Legal issues with purchase of land have now been resolved. Project is now being developed for tendering, with project completion
expected 30 September 2022.  It is anticipated that expenditure this financial year will be mainly on consultant costs.
Mitigating Action
None available at this time.
Anticipated Outcome
Extension to existing cemetery providing a sustainable burial environment.
Play Parks
Renew and replace play park equipment
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Funding received for renewal of play parks. Fire damage costs to be recovered from reserves.
Mitigating Action
None required at this time.
Anticipated Outcome
Renewal of play parks
New Play & Recreation at Radnor Park, including MUGA  & Inler Park
New Play & Recreation at Radnor Park, including MUGA.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Final Payment has now been made.
Page 241

Page 242

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 102 0 0% 102 0 0%
Current Year Financials 102 0 0% 0 (102) -100%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 740 350 47% 740 0 0%
Current Year Financials 648 258 40% 258 (390) -60%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Jul-21 31-Jul-21
Project Life Financials 217 3 1% 217 0 0%
Current Year Financials 214 0 0% 0 (214) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required at this time.
Anticipated Outcome
To provide people of West Dunbartonshire additional space to help adhere to social distancing guidelines.
Bus Rapid Deployment Fund
Funding has been awarded from Sustrans to assist with social distancing measures required as a
Spaces for People
Funding has been awarded from Sustrans to assist with social distancing measures required as a
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The project was introduced through funding from Scottish Government in 2020/21, in response to the COVID-19 pandemic.  The funding
was provided for widening of footpaths to abide by social distancing guidelines.  The works were not able to be completed in 2020/21 and
permission was granted to carry the grant forward into 2021/22 on the condition it was used by 31 July 2021.  The works at Smollet
Fountain are now complete and the works at Crosslet Road are now complete, however due to time constraints it is anticipated Officers will
only be able to use £0.268m of this budget with the remainder being an underspend.
Anticipated Outcome
To improve journey times and reliability of bus services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Officers working with external partners to identify projects to support funding. Investigation on going however unlikely works will be able to
progress until new financial year.
Mitigating Action
None required at this time.
Knowes Nature Reserve
Nature resource for Faifley Community
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Funding received from Nature Restoration Fund to build nature resource for Faifley community. Project due to commence 1st April 2022.
Mitigating Action
None required at this time.
Anticipated Outcome
Nature resource for Faifley Community
Page 242

Page 243

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 400 358 90% 400 0 0%
Current Year Financials 42 0 0% 0 (42) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 264 215 81% 264 0 0%
Current Year Financials 95 45 47% 45 (50) -53%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 963 57 6% 963 0 0%
Current Year Financials 963 57 6% 57 (907) -94%
Project Description
Project Manager Raymond Walsh/ Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Main Issues / Reason for Variance
Road construction works completed in previous years. Remaining funds insufficient to complete footpath construction. Works on hold until
such time as additional funds can be secured.
Mitigating Action
None available at this time.
Anticipated Outcome
To complete remaining civil works required.
Auld Street Clydebank - Bond
Completion of roadworks associated with Auld Street housing development.
Planned End Date Forecast End Date
Anticipated Outcome
To provide Electric Vehicle Charging points within West Dunbartonshire.
Flood Risk Management
Enhancement of drainage infrastructure to ensure compliance with Flood Risk Management Act
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Installation of Electric Vehicle Charging point are complete and awaiting electrical connections and commissioning with the original
£0.050m. A charging point will be installed at Moss O' Balloch car park with the additional £0.044m.
Mitigating Action
None required at this time.
Electrical Charging Points - Rapid Charge
Funding has been awarded from Transport Scotland for the Installation of electrical charging points
Main Issues / Reason for Variance
Several projects including Gruggies Burn being developed & issue of contract for design is imminent. Spend should accelerate quickly once
design contract is issued. Costs for this financial year will include consultation/design and ground investigations. Underspend to be
rephased into 2022/23.
Mitigating Action
None required at this time.
Anticipated Outcome
Projects should be complete within budget.
Page 243

Page 244

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 93 43 47% 93 0 0%
Current Year Financials 93 43 47% 43 (49) -53%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 800 181 23% 800 0 0%
Current Year Financials 343 23 7% 23 (320) -93%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 910 358 39% 910 0 0%
Current Year Financials 910 358 39% 358 (552) -61%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Mitigating Action
None required at this time.
Anticipated Outcome
Intention is to complete works within budget.
River Leven Flood Prevention Scheme
River Leven Flood Prevention Scheme.
Infrastructure - Flooding
Essential renewal of failed drainage assets to minimise flood risk within West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects being developed with full budget spend anticipated in 2022/23.
Main Issues / Reason for Variance
Officers will continue Bus Infrastructure Improvement works and continue the ongoing programme including bus borders and bus shelters. 
A814 Congestion Measures works will involve installation of Scoot and TLP (traffic management technology to optimise journey time). 
Kilbowie Rd A8014 - site investigation works & traffic surveys on the existing geometry of Kilbowie Road with respect to the railway bridge
have taken place and plans are under discussion.  Strathleven Active Travel Network - provision of a footway between Strathleven Place,
Dumbarton and A814 works are completed. Additional funding of £0.030m was received from SPT to cover additional costs this financial
year.
Mitigating Action
None required at this time.
Anticipated Outcome
Project should be completed within budget.
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements & Park and Rides
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Awaiting outcome of Scottish Government & SEPA deliberations, however officers are hopeful full budget spend can be incurred.
Mitigating Action
None required at this time.
Page 244

Page 245

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 500 11 2% 500 0 0%
Current Year Financials 120 0 0% 0 (120) -100%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Project Life Financials 86 173 202% 86 0 0%
Current Year Financials 86 173 202% 173 88 102%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 90 35 38% 90 0 0%
Current Year Financials 90 35 38% 35 (55) -62%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
Anticipated Outcome
Improve accessibility to Public Transport and improve journey time reliability.
Mitigating Action
None available at this time.
Anticipated Outcome
Project to be delivered within budget.
Mandatory 20mph Residential communities
Mandatory 20mph Residential communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Awaiting Scottish Government recommendations.
Depot Improvement Works
Improvement of WDC Roads Depot.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
New budget in 2021/22 to improve Elm Road Roads Depot.  New equipment has been purchased and balance of budget to be carried
forward into 2022/23 to be utilised for depot rationalisation works
Main Issues / Reason for Variance
Overspend due to essential works identified by investigations.
Mitigating Action
None available at this time.
Anticipated Outcome
Completion of works.
Street lighting and associated electrical infrastructure
WDC is responsible for the maintenance of 18,000 street lighting columns and associated illuminated
signs and bollards.  This budget is required for this infrastructure.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Page 245

Page 246

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 14,730 421 3% 14,730 0 0%
Current Year Financials 572 48 8% 48 (524) -92%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Project Life Financials 2,325 1,007 43% 2,325 0 0%
Current Year Financials 708 15 2% 15 (693) -98%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
Project Life Financials 4,300 3,802 88% 4,300 0 0%
Current Year Financials 2,285 1,788 78% 1,788 (498) -22%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
Project should be completed within budget.
A813 Road Improvement Phase 1
A813 Road Improvement Phase 1.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Report received June 2021 outlining proposed options. Underspend requires to be slipped into 2022/23 to progress options.
Mitigating Action
None available at this time.
Gruggies Burn Flood Prevention
Commission of Gruggies Flood Prevention Scheme.
Clydebank Charrette, A814
Clydebank Charrette, A814
Main Issues / Reason for Variance
Plans have been developed for carriageway widening & footway/cycleway construction between Strathleven and Lions Gate.  Due to
ongoing discussions with Aggreko and other land owners in regards to access & land acquisition there will only be consultancy and design
costs in this financial year with construction commencing in the new financial year.
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
Anticipated Outcome
Project should be completed within budget by spring 2022 enhancing the A814 through Clydebank.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing well and project should be completed by spring 2022.
Mitigating Action
None required at this time.
Page 246

Page 247

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 4,152 3,846 93% 4,152 0 0%
Current Year Financials 723 417 58% 417 (306) -42%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-May-21
Project Life Financials 1,030 643 62% 1,030 0 0%
Current Year Financials 442 595 135% 595 153 35%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
Project Life Financials 3,042 1,442 47% 3,042 0 0%
Current Year Financials 3,042 1,442 47% 1,442 (1,600) -53%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Main Issues / Reason for Variance
Works to Lomond Bridge were completed May 2021.
Mitigating Action
None required.
Anticipated Outcome
To provide an improved Lomond Bridge.
A811 Lomond Bridge
Upgrade of Lomond Bridge.
Planned End Date Actual End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Vehicles are being ordered for delivery in this financial year, however some delay is anticipated resulting in funds slipping into FY 2022/23.
Mitigating Action
None Required.
Mitigating Action
None available at this time.
Anticipated Outcome
To upgrade bridges within West Dunbartonshire.
Vehicle Replacement
Replacement of vehicles which have reached end of programmed lifespan (7 year heavy vehicles, 10
year light vehicles).
Protective overcoating to 4 over bridges River Leven
To overcoat 4 bridges over River Leven.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works to Renton footbridge are now complete. Additional works were required in regard to bridge stair bearings & support work flanges
and has resulted in approximately £0.142m overspend.
Anticipated Outcome
Replacement of fleet within budget.
Page 247

Page 248

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 400 0 0% 400 0 0%
Current Year Financials 400 0 0% 0 (400) -100%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 1,980 0 0% 1,980 0 0%
Current Year Financials 60 0 0% 0 (60) -100%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Project Life Financials 160 0 0% 160 0 0%
Current Year Financials 80 0 0% 0 (80) -100%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
Waste Transfer Station
The design, development and construction of a recycling and bulk waste transfer facility that will
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project group set up and working on development plans. Consultants hired. Budget will be spent in 2022/23.
Main Issues / Reason for Variance
Only two gritters will be purchased this financial year with the rest to follow in 2022/23. Additional work being undertaken to the gritters
before they are delivered.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within  budget.
Purchase of gritters
Purchase of gritters.
Planned End Date Forecast End Date
Anticipated Outcome
Project delivered within  budget.
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within budget.
Replacement of compactors at Dalmoak civic amenity site
The purchase of 2 compactors for the Council civic amenity site at Dalmoak.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Compactors procurement concluded. Delivery expected in Spring 2022.
Mitigating Action
None Required.
Page 248

Page 249

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 23,758 23,761 100% 23,761 3 0%
Current Year Financials 0 4 0% 4 4 0%
Project Description
Project Manager Craig Jardine
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project Life Financials 1,150 1,124 98% 1,150 0 0%
Current Year Financials 49 23 47% 23 (26) -53%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 30-Apr-22
Project Life Financials 1,110 188 17% 1,110 0 0%
Current Year Financials 443 61 14% 61 (381) -86%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-29 31-Mar-29
Mitigating Action
None required
Although there is slippage caused mainly by the academic year starting several months after the financial year the project is still on track to
be completed by the planned end date.
Mitigating Action
None available at this time.
Anticipated Outcome
Purchase of AV Equipment for Education.
AV Equipment - Education
Purchase of AV Equipment for Education.
Planned End Date Forecast End Date
Dalmonach CE Centre
Clydebank Leisure Centre
Construction of new sports centre.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Final water charges and legal costs in relation to the building of the sports centre.
Anticipated Outcome
Construction of new sports centre
Main Issues / Reason for Variance
To create new community facilities with additional space for early years provisions.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete and final account to be agreed.
Mitigating Action
None required.
Anticipated Outcome
To create new community facilities with additional space for early years provisions.
Page 249

Page 250

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 10,950 11,067 101% 11,067 117 1%
Current Year Financials 0 117 0% 117 117 0%
Project Description
Project Manager Lesley Woolfries/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-21 09-Aug-17
Project Life Financials 20,000 14,817 74% 20,000 0 0%
Current Year Financials 6,200 4,180 67% 4,180 (2,020) -33%
Project Description
Project Manager Lesley Woolfries/ Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
None available at this time.
Anticipated Outcome
Schools Estate Improvement Plan
Improvement of Schools Estate.
With regards the St Mary's Alexandria Refurbishment works, the MUGA is anticipated to commence August/September.  The dining and
kitchen extension will not be able to commence until these works are complete and due to the disruptive nature of the works and will not
commence until Summer 2022.  This has resulted in an estimated spend at St Mary's of £0.004m in 2021/22 against a budget of £0.214m
resulting in rephasing of £0.210m to 2022/23. 
With regards to Additional ASN Provision (Secondary Phase) and Skills School (Senior Phase) these are being rephased to next financial
year as awaiting site selection and the programme of works. 
Finally the installation of artificial grass at Balloch Campus is complete accounting for £0.008m of the current year spend.   In summary,
£4.179 has been spent of the current year total budget in 2021/22 with estimated £2.020m required to be rephased to 2022/23.
Kilpatrick School - New Build
Design and build of construction of  Additional Support Needs School.
Planned End Date
Anticipated Outcome
Project delivered within budget and to the revised programme, following COVID-19.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The £20m project life budget is broken down as follows,  £15.1m New Build Renton Campus; £0.881m St Mary's Alexandria; £0.300m
Additional ASN Provision (Secondary Phase); £2.5m Skills School (Senior Phase); £0.008m Balloch Campus, Lomond Base (artificial
grass) with the remaining budget of £1.211m unallocated at this time.  The current year budget is allocated, £4.609 New Build Renton
Campus; £0.214m St Mary's Alexandria; £0.300m Additional ASN Provision (Secondary Phase); £1.069m Skills School (Senior Phase);
£0.008m Balloch Campus, Lomond Base (artificial grass). 
Mitigating Action
With regards to the new Renton Campus, Officers are working to plan the migration from existing premises to work with programmed
October 2021 Phase 1 completion where the new building and immediate playground and some parking provision is delivered. Overall
project with Phase 2 & final phase 3 due to complete in July 2022.  Ongoing dialogue with the  main contractor and client to mitigate risks
to Phase 1 handover date.
Project complete albeit over budget.
Actual End Date
Main Issues / Reason for Variance
The Final Account has been agreed with final payment now paid.  Project was physically complete August 2017 with retentions now fully
paid, Making Good Defects Certificate issued.
Mitigating Action
Page 250

Page 251

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 28,860 95 0% 28,860 0 0%
Current Year Financials 318 54 17% 54 (265) -83%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-26 31-Mar-26
Project Life Financials 750 637 85% 750 0 0%
Current Year Financials 113 (1) 0% (1) (113) -100%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 31-Mar-22
Main Issues / Reason for Variance
The next phase of the Schools Estate Improvement Plan involves the development of a new Campus provision in the Faifley area.  Officers
have been tasked with providing a funding submission to the Scottish Government Learning Estate Improvement Programme.  The bid
submission was  made in October  2020 and WDC has been successful in securing funding, SFT confirmed the indicative funding
allocation for this project at £18.416m on the 4 May 2021, this will be received as a revenue stream over the 25 years of the Scottish
Government financial support (subject to the Council adhering to the funding criteria). Site Options Appraisal has taken place and Members
approved the  recommendation to proceed with the new Faifley Campus on the  St Joseph's site at Education Committee 9th June
2021. The next phase will see the appointment of design team and main contractor to proceed with Design Development for the new
Campus. As a result of programme changes concept design will now commence end of March 2022, this will not impact on the overall
completion of the project. The statutory consultation process was launched in September 2021 and a report will be brought back to the
Educational Services committee in 2022. 
Mitigating Action
None available at this time.
Anticipated Outcome
Delivery of the project will be on time.
Schools Estate Improvement Plan - next Phase - Faifley Campus
Improvement of Schools Estate.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The remaining budget is to be used for replacement windows, however the cost of these is currently unknown due to supplier issues
caused by Brexit and the work can only be carried out in a school recess period.
Mitigating Action
None available at this time.
Choices Programme - to assist young people who require additional support
Bringing together Central Support Services which will include relocation of Choices Programme.
Anticipated Outcome
Project delivered on budget.
Page 251

Page 252

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 5,508 5,505 100% 5,509 1 0%
Current Year Financials 4 1 27% 1 (3) -73%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 30-Apr-21
Project Life Financials 0 40 0% 40 40 0%
Current Year Financials 0 40 0% 40 40 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Oct-21 31-Oct-21
Project Life Financials 1,113 884 79% 1,113 0 0%
Current Year Financials 1,113 884 79% 884 (229) -21%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-22 31-Mar-22
Schools Estate Refurbishment Plan
Completion of condition surveys has been carried out to identify works required to bring various
schools from Condition C to Condition B.
Planned End Date Forecast End Date
None required.
Anticipated Outcome
Noise reduction
Balloch Campus
To erect noise barrier
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Acoustic survey was carried out following a number of complaints by neighbours and MSP. This survey indicated that additional fencing
was required and this work has now been completed.
Mitigating Action
Planned End Date
Main Issues / Reason for Variance
Forecast End Date
Lower provision of aids and adaptations to HSCP clients than anticipated due to Covid which will be caught up next financial year.
Mitigating Action
None available at this time
Anticipated Outcome
Provision of adaptations and equipment to HSCP clients as anticipated.
Aids & Adaptations - Special Needs Adaptations & Equipment
Reactive budget to provide adaptations and equipment for HSCP clients.
Main Issues / Reason for Variance
Project Complete awaiting final recharges in relation to playground works.
Mitigating Action
None required.
Anticipated Outcome
Project delivered on time and within budget
Page 252

Page 253

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 63 0 0% 63 0 0%
Current Year Financials 63 0 0% 0 (63) -100%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 27,531 27,211 99% 27,531 0 0%
Current Year Financials 477 158 33% 158 (319) -67%
Project Description
Project Manager Lesley Woolfries/ Craig Jardine
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-22 31-Mar-22
Mitigating Action
The statement of final account has been signed and financial risk exposure should be reduced through efforts to dispose of the existing
properties at the earliest opportunity.
Anticipated Outcome
Dumbarton Care Home opened 2017.  Clydebank Care Home was certified complete on 9 November 2020 and projected to deliver on
budget.
Replace Elderly Care Homes and Day Care Centres
Design and construction of replacement elderly care homes and day care centres in Dumbarton and
Clydebank areas.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Clydebank Care Home (Queens Quay House) completion was certified 9 November 2020.  The Statement of Final Account has been
agreed with the Principal Contractor at a figure less than the cost plan and as such officers have adjusted the project outturn to report the
project will be delivered on budget.  The residents from the two existing Clydebank Care Homes moved into Queens Quay House on 14
and 15 December 2020.  Officers in HSCP and Asset Management are progressing the disposal strategy for Mount Pleasant, Frank
Downie and Queen Mary Day Centre.  The remaining budget this year will now be slipped into 22/23 and paid out when all remaining
defects have been addressed. 
None available at this time
Anticipated Outcome
Renovation of Unit 11 Levenside Business Court
Criminal Justice Adaptations
Renovation of Unit 11 Levenside Business Court.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Contact has been made with procurement and colleagues are preparing tender documentation. The project will slip into 2022/23.
Mitigating Action
Page 253

Page 254

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 903 407 45% 903 0 0%
Current Year Financials 903 407 45% 407 (497) -55%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-22 31-Mar-23
Project Life Financials 60 43 72% 60 0 0%
Current Year Financials 53 36 68% 36 (17) -32%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-22 31-Mar-22
Internet of Things Asset Tracking
Asset Tracking.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project continues to progress but recent delay advised due to supply chain for some of the hardware components.
Anticipated Outcome
Half of the budget spent with some of the HSCP allocation for the wider system review project for case management being rephased.
Supply chain delays may impact delivery of existing committed budget.
Planned End Date Forecast End Date
Carry remaining budget to FY 22-23.
Anticipated Outcome
Main Issues / Reason for Variance
Device orders for mobile phones, laptops and PC's have £0.150m spent and further £0.136m committed to date. Chromebook supply and
device models now confirmed by Procurement Scotland so back log of orders will now start to be raised but supplier continues to advise of
delivery delays. HSCP £0.413m allocation is expected to be rephased to 22/23 for the wider system review project for case management.
Mitigating Action
Continue to escalate and meet framework suppliers to confirm delivery lead times.
Investigate other procurement routes as well as adjust the project scope to replace where stock allows.
ICT Modernisation
This budget is to facilitate ICT infrastructure and modernise working practices.
Mitigating Action
Project complete. Delayed but on budget.
Page 254

Page 255

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 1,120 425 38% 1,120 0 0%
Current Year Financials 1,120 425 38% 425 (695) -62%
Project Description
Project Manager Brian Miller/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Jul-22 31-Jul-22
Project Life Financials 250 177 71% 250 0 0%
Current Year Financials 169 147 87% 147 (23) -13%
Project Description
Project Manager Dorota Piotrowicz/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 30-Jun-22 30-Jun-22
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget is committed and suppliers actively working on the project. Project scope changes have been costed and additional budget has
been added to the capital plan refresh for consideration.   Some aspects of the project have been reduced.  Full budget spend anticipated
but will be delayed due to resource changes.
Mitigating Action
Carry underspne into 2022/23.
Anticipated Outcome
Budget spent but potentially delayed.
Anticipated Outcome
Continue to anticipate the majority of budget being committed but not spent.
365 Implementation
Project services to delivery Microsoft 365 Implementation including 3rd party supplier, training,
technical consultancy etc.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Switch replacement (£0.514m) order raised and deliveries started.  Awaiting invoice from supplier regarding goods delivered to date. SAN
replacement (£0.330m) tender published in February therefore this budget will carry to 2022-2023.  Project scope change being
considered linked to 365 cloud back up requirements. As with the switch replacement, global supply shortages means this aspect of the
budget will slip into next financial year. Bandwidth improvement projects continue on time and within budget.
Mitigating Action
Monitor supply chain. Continue tendering processes. Seek to carry budget in 22/23 as supply chain issues continue
ICT Security & DR
The project is for the enhancement of security systems, server replacement and the update of
corporate applications to ensure compliance with 15/16 PSN requirements,  to enhance the disaster
recovery capabilities of WDC.
Page 255

Page 256

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Project Life Financials 270 2 1% 270 0 0%
Current Year Financials 58 0 0% 0 (58) -100%
Project Description
Project Manager James Gallacher/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-29 31-Mar-29
Project Life Financials 3,502 4,241 121% 4,241 739 21%
Current Year Financials 3,502 4,241 121% 4,241 739 21%
Project Description
Project Manager N/A
Chief Officer N/A
Project Lifecycle 31-Mar-22 31-Mar-22
Mitigating Action
None required.
Anticipated Outcome
Direct project support costs allocated as appropriate.
Direct Project Support
Business support cost such as reallocation of architects and project support at year end.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Salary Capitalisation in 2021/22.
Mitigating Action
None rquired
Anticipated Outcome
Education software refreshed as required.
Education Software Licensing Refresh
End of Life Software Upgrades for Education.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
To date no Education-specific software has been identified during the annual network security penetration test. Budget to be carried to
2022-23
Page 256

Page 257

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 40 0 0% 0 (40) -100%
Current Year Financials 40 0 0% 0 (40) -100%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 31-Mar-22
2
Project Life Financials 53 13 25% 53 0 0%
Current Year Financials 20 13 66% 13 (7) -34%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
3
Project Life Financials 10 10 99% 10 (0) -1%
Current Year Financials 2 2 96% 2 (0) -4%
Project Description
Project Manager Tony Cairns/ Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 30-Jun-21
Main Issues / Reason for Variance
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Main Issues / Reason for Variance
A review of the requirements needed has confirmed that we do not need any capital monies to ensure compliance in this area.
Mitigating Action
None required at this time.
Anticipated Outcome
WDC compliance with HMRC Making Tax Digital.
Making Tax Digital
Making Tax Digital.
Planned End Date Forecast End Date
Solicitor Project Support for Capital Projects
Solicitor costs to directly support capital projects
Planned End Date Forecast End Date
Mitigating Action
None Required.
Anticipated Outcome
To protect WDC's most vulnerable residents from phone calls from which they may fall victim of hard selling techniques, scams and other frauds.
Trading Standards Scam Prevention
Call blocking devices to be fitted to the phones of WDC's most vulnerable residents which will block unknown
numbers from connecting and limiting incoming calls to only known and trusted numbers, for vulnerable
consumers who may be susceptible to hard selling techniques, scams and other frauds.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Final balance of budget rephased from 2020/21 into 2021/22 as project could not complete in 2020/21 due to COVID-19 restrictions.  Project now
complete,
Trainee solicitor has now started and costs of £13117 have been incurred leaving a carryforward of £6883.
Mitigating Action
None required at this time.
Anticipated Outcome
Solicitor support for Capital Projects, with full budget spend.
Page 257

Page 258

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
4
Project Life Financials 10 10 100% 10 0 0%
Current Year Financials 10 10 100% 10 0 0%
Project Description
Project Manager Pamela Clifford
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-22
5
Project Life Financials 20 13 66% 20 0 0%
Current Year Financials 19 13 65% 13 (7) -35%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-23
6
Project Life Financials 55 55 99% 55 (0) -1%
Current Year Financials 33 33 99% 33 (0) -1%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-22
Antonine Wall Heritage Lottery Fund
Antonine Wall Heritage Lottery Fund.
Anticipated Outcome
Preservation of Historic Site.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete.
Mitigating Action
None Required.
Replace failed heating controls/valves & recommission
Replace failed heating controls/valves & recommission.
Planned End Date Actual End Date
Main Issues / Reason for Variance
Further works being identified and with balance being carried forward and utiitsed in FY 22/23.
Mitigating Action
None required.
Anticipated Outcome
Delivery of project in FY 22/23.
Mitigating Action
None required.
Anticipated Outcome
All works completed 2021/22.
Automatic Meter Readers
Automatic Meter Readers.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Work Completed.
Page 258

Page 259

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
7
Project Life Financials 45 28 63% 28 (17) -37%
Current Year Financials 18 2 10% 2 (17) -90%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-22
8
Project Life Financials 16 14 85% 16 0 0%
Current Year Financials 10 7 75% 7 (2) -25%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-May-22
9
Project Life Financials 1,867 1,768 95% 1,867 0 0%
Current Year Financials 1,867 1,768 95% 1,768 (99) -5%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-22 31-Mar-22
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Order raised and expect £0.007m spend. The work is now 80% complete.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Replacement of Urinals
Water Meter Downsize
Water Meter Downsize.
Urinal Controls
Urinal Controls.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The bulk of the work was provided free of charge from a Grant Efficiency Fund available to public bodies.
Anticipated Outcome
Delivery of project within budget.
LUF
Year one LUF spend includes acquisition cost of Artizan Centre, and design development for Glencairn House
and Connecting Dumbarton
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects are progressing and the acquisition of the Artizan Centre has been completed.
Mitigating Action
None available at this time.
Anticipated Outcome
Redevelopment of the Dumbarton Town Centre
Page 259

Page 260

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
10
Project Life Financials 0 15,737 0% 15,737 15,737 0%
Current Year Financials 0 (8) 0% (8) (8) 0%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-21 31-Mar-21
11
Project Life Financials 3,341 3,341 100% 3,341 0 0%
Current Year Financials 9 9 100% 9 0 0%
Project Description
Project Manager Michelle Lynn/Amanda Graham
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-May-21
12
Project Life Financials 3,865 3,857 100% 3,857 (8) 0%
Current Year Financials 8 0 0% 0 (8) -100%
Project Description
Project Manager Lesley Woolfries/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 26-Oct-18
The Queens Quay infrastructure works are now complete. The next stage of the wider Regeneration of the site will require private housing developers
to secure land and build the planned 1,000 new homes across the site. Balance is the recovery of legal fees from NHS during FY 21/22.
Mitigating Action
None available at this time.
Anticipated Outcome
Regeneration works of Clydebank Waterfront at Queens Quay.
Forecast End Date
Main Issues / Reason for Variance
Queens Quay - Regeneration
Queens Quay regeneration.
Planned End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Project will be delivered within budget.
Civic Heart Works - Refurbishment of Clydebank Town Hall
Refurbishment of Clydebank Town Hall.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works complete.
Clydebank Community Sports Hub
Creation of a community and sport hub.
Planned End Date Actual End Date
Main Issues / Reason for Variance
The facility has been operational since October 2018.  Following the termination of the construction contract in the post completion phase,  officers
have completed defect rectification to the allotment area and completed outstanding work to the natural grass pitch.  Due to the excessive quotes
received to rectify the defects, the decision was taken to no longer pursue rectification as this presents too great a financial risk to WDC.  Final
professional fees have now been paid.  The £0.008m budget allocation for financial year 2021/22 was not required.
Mitigating Action
Statement of Final Account shall be agreed to bring project expenditure to a conclusion.
Anticipated Outcome
New facility has been operational since October 2018. 
Page 260

Page 261

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
13
Project Life Financials 110 23 20% 110 0 0%
Current Year Financials 23 15 67% 15 (7) -33%
Project Description
Project Manager Graham Watters
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
14
Project Life Financials 220 214 97% 220 0 0%
Current Year Financials 20 13 67% 13 (7) -33%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 03-Apr-21 03-Apr-21
15
Project Life Financials 692 682 98% 682 (11) -2%
Current Year Financials 692 682 98% 682 (11) -2%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
Development of IHMS system.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Development of system progressing with underspend in year to be rephased into 2022/23
Mitigating Action
None required at this time.
Integrated Housing Management System
Development of IHMS system.
Sports Facilities Upgrades - Argyll Park - Construction of 3 All Weather Tennis Courts
Project is part of wider investment in sporting facilities and is dependent on match funding from Sports Scotland.
Agreement in principle to wider WDC strategic priorities.
Anticipated Outcome
New all weather tennis courts.
Cycling, Walking and Safer Streets
Introduction of enhanced walking routes and traffic calming schemes to introduce safer streets within West
Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project completed
Mitigating Action
None required at this time.
Anticipated Outcome
To improve connectivity and enhanced Cycling routes within West Dunbartonshire.
Planned End Date Actual End Date
Main Issues / Reason for Variance
Project works complete.
Mitigating Action
None required at this time.
Page 261

Page 262

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
16
Project Life Financials 103 96 93% 199 96 93%
Current Year Financials 103 96 93% 96 (7) -7%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
17
Project Life Financials 200 195 97% 200 0 0%
Current Year Financials 200 195 97% 195 (5) -3%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
18
Project Life Financials 60 55 91% 60 0 0%
Current Year Financials 7 2 23% 2 (5) -77%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Mitigating Action
None required at this time.
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Additional Pavement Improvements
Extra funding to accelerate pavement maintenance and improvements across West Dunbartonshire.
Footways/Cycle Path Upgrades
Renewal and/or enhancement of failed footpaths/cycle paths through West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Various link pathways to be improved utilising this budget.  Underspend to be rephased into 2022/23
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works to Footways in Dumbarton East commenced  early July 2021 and are now complete & invoiced. Full budget spend.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Traffic calming to be installed in Dumbarton East.
Turnberry Homes - traffic calming/ management at Turnberry housing development off Castle Road
Funding has been received from Turnberry Homes and will be used to introduce traffic calming and traffic
management measures to mitigate the impact of additional traffic accessing the housing development off Castle
Road, Dumbarton.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultation completed just before Christmas and speed humps will be installed during FY 22/23.
Page 262

Page 263

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
19
Project Life Financials 3,899 3,635 93% 3,899 0 0%
Current Year Financials 3,899 3,635 93% 3,635 (264) -7%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
20
Project Life Financials 2,325 0 0% 2,325 0 0%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
21
Project Life Financials 7 7 100% 7 0 0%
Current Year Financials 7 7 100% 7 0 0%
Project Description
Project Manager Catherine Toner
Chief Officer Gail MacFarlane
Project Lifecycle 01-Mar-22 31-Mar-22
Sustrans
Purchase of cycle racks within schools
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Income from Sustrans 21/22 for the purchase and installation of cycle racks and shelters at various WDC schools.
Mitigating Action
None required.
Infrastructure - Roads
Infrastructure - Roads.
Anticipated Outcome
Completion of various resurfacing works.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Roads Operations and external contractors have almost completed the extensive surfacing programme of schemes. Undepsnd to be carried forward
into 2022/23.
Mitigating Action
None required at this time.
A813 Road Improvement Phase 2
A813 Road Improvement Phase 2.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
These works are not due to commence until Phase 1 has been completed.
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
Anticipated Outcome
Installation of cycle racks and shelters at various WDC schools.
Page 263

Page 264

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
22
Project Life Financials 376 335 89% 376 0 0%
Current Year Financials 331 291 88% 291 (41) -12%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 31-Mar-22
23
Project Life Financials 122 122 100% 122 (0) 0%
Current Year Financials 122 122 100% 122 (0) 0%
Project Description
Project Manager Andrew Brown
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 31-Mar-22
24
Project Life Financials 199 190 95% 199 0 0%
Current Year Financials 100 90 90% 90 (9) -10%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Oct-22 31-Oct-22
Co2 Monitors in Schools
Digital Inclusion
Increase the ratio of chrome book devices for most disadvantaged children and families and support for families
with remote access.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Additional devices have been ordered to increase the ratio of devices to pupils as part of a commitment towards a 1:1 device ratio. Underspend on
budget to be repahsed into 2022/23.
Mitigating Action
None required at this time.
Anticipated Outcome
Increase the Chromebook ratio for most disadvantaged children.
Co2 Monitors in Schools
To provide all education establishments with CO2 monitors to record the levels of CO2 in learning and teaching
spaces, in order to adjust ventilation/heating appropriately. Progress with this is reported to Scottish
Government
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project completed
Mitigating Action
None required at this time.
Anticipated Outcome
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered on budget within amended timescales.
Free School Meals
Provision of Capital Funding from Scottish Government to implement free school meal initiative.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project is complete other than snagging works which can only be completed when school is closed however project end date is still on target.
Page 264

Page 265

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
25
Project Life Financials 8,717 7,953 91% 8,717 0 0%
Current Year Financials 1,936 1,172 61% 1,172 (764) -39%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 31-Mar-22
26
Project Life Financials 12 12 100% 12 0 0%
Current Year Financials 12 12 100% 12 0 0%
Project Description
Project Manager George Hawthorn
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-22 29-Sep-21
27
Project Life Financials 47 47 0% 47 0 0%
Current Year Financials 47 47 0% 47 0 0%
Project Description
Project Manager Brian Miller/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-25 31-Mar-25
SIP Swan Trunking
This project is to replace legacy Analogue Telephony infastructure with new Digital Telephony infrastructure due
to the phasing out of the Legacy infrastructue by 2025
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This project to replace legacy Analogue Telephony infastructure with new Digital Telephony infrastructure has just started and will continue until 2025.
Mitigating Action
Carry underspne into 2022/23.
Anticipated Outcome
Budget spent but potentially delayed.
Fund Blended Meetings
Money to Fund Blended Meetings
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The system has been tested and accordingly the Council meeting on 29 September as conducted as a hybrid meeting.
Mitigating Action
None required
Anticipated Outcome
System now in place.
Mitigating Action
None required at this time.
Anticipated Outcome
The project will be completed to deliver the requirements of the Early Years expansion plans.
Early Years Early Learning and Childcare Funding
Early learning and childcare funding awarded to West Dunbartonshire Council to facilitate the expansion in
entitlement to funded ELCC to 1140 hours from August 2020.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing and some budget is unallocated at present and will be rephased to 2022/23.
Page 265

Page 266

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 12
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
28
Project Life Financials 100 100 100% 100 (0) 0%
Current Year Financials 50 50 99% 50 (0) -1%
Project Description
Project Manager Alison McBride
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-22 30-Sep-21
29
Project Life Financials 423 42 10% 423 (0) 0%
Current Year Financials 42 42 100% 42 (0) 0%
Project Description
Project Manager Arun Menon
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-30 31-Mar-30
Main Issues / Reason for Variance
Full current year budget has been spent.
Mitigating Action
None required.
Anticipated Outcome
Development of Workforce Management System.
Anticipated Outcome
Full project rollout.
Development of Workforce Management System
Project to develop the Workforce Management System.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Final payment has now been made and project is complete.
Mitigating Action
None required.
IoT Employee Resilience Support
Employee Resilience Online Support Tool.
Page 266

Page 267

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 12
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (141) (99) 70% (141) 0 0%
Current Year Financials (1,215) (937) 77% (937) 278 -23%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
2
Project Life Financials (70,396) (28,682) 41% (70,396) 0 0%
Current Year Financials (843) (581) 69% (581) 262 -31%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
3
Project Life Financials (40,468) (6,157) 15% (41,006) (538) 1%
Current Year Financials (6,382) (1,265) 20% (1,265) 5,117 -80%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
4
Project Life Financials (16,085) (7,862) 49% (15,757) 328 -2%
Current Year Financials (7,406) (3,994) 54% (3,994) 3,412 -46%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
31 March 2022
Budget Details
Project Life Financials
Application of resources is dependent on capital project progressing in year as planned.
Spend to Date Forecast Variance
Resources Carried Forward
These are resources that have been received in previous years relating to Turnberry Homes, Early Years, Town
Centre Fund Grant, Digital Inclusion, Clydebank Can on the Canal, Internet of Things Asset Tracking and Auld
Street Bond.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Application of resources held on balance sheet as at 31 March 2021 as appropriate.
General Services Capital Grant
This is a general grant received from the Scottish Government in relation to General Services capital spend
Application of resources is dependent on capital project progressing in year as planned.
Main Issues / Reason for Variance
General services capital grant is anticipated to be received as forecast.
Mitigating Action
None required at this time
Anticipated Outcome
General services capital grant is anticipated to be received as forecast.
Ring Fenced Government Grant Funding
This is ring fenced grant funding which is primarily anticipated to be received from the Scottish Government and
relates to Cycling, Walking, Safer Streets, Regeneration Placed Based Investment Programme, Early Years,
Gruggies Burn Flood works, Early Years funding, City Deal and Town Centre Fund.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
None required.
Mitigating Action
Mitigating actions are detailed within the appropriate status updates.
Anticipated Outcome
Application of resources as appropriate.
Match Funding / Other Grants and Contributions
Match Funding / Other Grants and Contributions
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application of resources is dependent on capital project progressing in year as planned.
Mitigating Action
Anticipated Outcome
Match funding received.
Page 267

Page 268

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 12
Budget Forecast Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Forecast Variance
Resources Carried Forward5
Project Life Financials (39,439) (258) 1% (40,631) (1,192) 3%
Current Year Financials (14,010) (2,270) 16% (2,270) 11,740 -84%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
6
Project Life Financials (163,979) (169,940) 104% (180,305) (16,326) 10%
Current Year Financials (26,844) (24,501) 91% (24,501) 2,344 -9%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
7
Project Life Financials (25) 0 0% 0 25 0%
Current Year Financials (25) (72) 0% (72) (47) 0%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
Capital receipts received.
Capital Receipts
These are capital receipts that are anticipated from sales of land and buildings both as part of the normal disposal
programme and also as part of the business case investment in office rationalisation, new school building and new
care home development
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Receipts budgets are based on assumptions in relation to the sale of various sites. Not all sales will be realised this financial year. The main ones
being OLSP, St James retail park, Dalreoch Care Home. Queen's Quay, Levenbank Terrace, Heather Avenue, Crosslet House. As agreed at
Council receipts received are used firstly to pay for principle and premiums.
Mitigating Action
While market conditions are out with officers control all potential receipts will be explored.
Anticipated Outcome
This is capital spend which is funded by revenue budgets
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved for the purposes of
funding capital expenditure
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery therefore mitigating action is detailed in the red and amber analysis.
Mitigating Action
None available at this time.
Anticipated Outcome
While prudential borrowing requirement is likely to be less than budgeted in the current financial year this is anticipated to catch up over the
programme life.
CFCR
Anticipated Outcome
CFCR applied to relevant capital project.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renovation of Unit 11 Levenside Business Court
Mitigating Action
None required at this time.
Page 268

Page 269

APPENDIX 5
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 12
Spend to Date Spend to Date
£000 £000
Red
14 51.9% 25,784 68.0% 14 51.9% 18,484 60.4%
Amber
6 22.2% 3,599 9.5% 6 22.2% 3,599 11.8%
Green
7 25.9% 8,517                     22.5% 7 25.9% 8,517                27.8%
27 100% 37,900 100% 27 100% 30,600 100%
Budget Spend to
Date Forecast Spend Forecast
Variance Budget Spend to Date Actual Spend Actual
Variance Slippage Over/ (Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
195,734 25,784 198,912 3,178 35,611 18,484 18,484 (17,127) (19,379) 2,252
9,861 3,599 10,177 316 3,467 3,599 3,599 132 (79) 211
38,305 8,517 38,004 (301) 9,250 8,517 8,517 (733) (467) (266)
243,900 37,900 247,093 3,193 48,328 30,600 30,600 (17,728) (19,926) 2,198
243,900 37,900 247,093 (3,193) 48,328 30,600 30,600 17,728
0 0 0 0 0 0 0 0
Projects are on target both in relation to overall budget and the
forecast stages in the project life cycle and no issues are
anticipated at this time
31 March 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
% Projects at
RAG Status
% Project
Spend at
Number of
Projects at
% Projects at
RAG Status
% Project
Spend at RAG
Red
Projects are forecast to be overspent and/or experience material
delay to completion
Amber
Projects are either at risk of being overspent and/or delay in
completion (although this is unquantifiable at present) or the project
has any issues that require to be reported at this time
Green
Project Status Analysis
Project Life Financials Current Year Financials
Red
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in
completion (although this is unquantifiable at present) or the project
has any issues that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the
forecast stages in the project life cycle and no issues are
anticipated at this time
TOTAL EXPENDITURE
Page 269

Page 270

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 135,877 14,689 11% 136,187 310 0%
Current Year Financials 20,281 7,389 36% 7,389 (12,892) -64%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
2
Project Life Financials 10,539 1,357 13% 10,539 0 0%
Current Year Financials 3,831 1,357 35% 1,357 (2,474) -65%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Doors/window component renewals
Doors/Windows Component Renewals
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Installs are behind original planned targets, however the combined internal and external contractor resources are showing an
upturn in completions and an overall improving position.  Officers will continue to monitor and support this position to maintain
improvements.  Full budget spend was not possible in 21/22, rephasing of £2.474m required to be carried to 22/23 for
continuation of works.
Mitigating Action
Progress on this will continue to be monitored closely into 22/23.
Slippage is required to be carried forward into 22/23.
Anticipated Outcome
Affordable Housing Supply Programme
Affordable Housing Supply Programme 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
The current year variance of £12.892m is made up of  £8.503m slippage on existing sites, predominantly Clydebank East, 
£4.443m slippage on future new builds, and there is a net overspend of £0.054m.  The overspend is made up of an
underspend on anticpated support costs of £0.619m, an overspend on Dumbarton Harbour Ph3 of £0.616m and overspend of
£0.030m on Second Ave development.  Site specific updates will be provided in the first report of 22/23.
All projects have now been reprofiled and in the case of Clydebank East it is now anticipate a site start late 2022.
Anticipated Outcome
Delivery of Programme will be achieved.
Mitigating Action
Page 270

Page 271

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
3
Project Life Financials 3,429 505 15% 3,429 0 0%
Current Year Financials 746 505 68% 505 (241) -32%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
4
Project Life Financials 192 0 0% 192 0 0%
Current Year Financials 192 0 0% 0 (192) -100%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-23
Glasgow Airport has committed to develop and implement a Noise Insulation Policy to mitigate noise for residents most
affected by aviation noise.  To develop this the Council has committed to working jointly with the Airport to procure a leading
expert in the field to manage the trial on behalf of our collective organisations and ultimately develop a phased programme of
works in parallel with existing window replacement and insulation programmes to mitigate the noise experienced by tenants
within a specified area.  However the planned activity was put on hold during 2021 due to the COVID pandemic and the
inability to access properties and also the lack of aircraft flying to facilitate a meaningful trial. In that time, the airport
requirement to roll out a permanent insulation scheme has taken precedence for Glasgow Airport Authorities. The full scheme
should have launched in early 2022 and we await further information as to the reason for such a delay, WDC are considering
how reallocation of the earmarked budget could be best utilised towards noise improvement.  It is possible that funds could be
used to supplement the Airport contribution where additional improvements are possible but in excess of the allocated airport
financial contribution.  This will be reviewed and recommendations made once in receipt of the airport scheme outline.
Mitigating Action
There is regular dialogue between the Council and Glasgow Airport, and there is the basis of an agreed delivery plan which
was ready to be implemented prior to the pausing of the project.  This can be re-established immediately by both parties,
however it has to be recognised the nature of works will not complete until 22/23, however both parties still remain committed
to its delivery.
Anticipated Outcome
Slippage is required to be carried forward into 22/23.
Airport Noise Insulation Scheme
Noise Insulation Project
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Anticipated Outcome
Slippage is required to be carried forward into 22/23.
Defective structures/component renewals
Defective structures
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Programme continues albeit there are challenges with vacating tenants in next block to commence, impacted by COVID and
suitable decant locations.  Housing officers working to resolve this.  Overall programme behind where wanted to be at this
stage.  Budget underspent in current year, with balance required to be carried to 22/23 to complete works.
Mitigating Action
Officers will work to maximise on opportunities to catch up on programme.
Page 271

Page 272

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
5
Project Life Financials 4,972 1,316 26% 5,341 369 7%
Current Year Financials 948 1,316 139% 1,316 368 39%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
6
Project Life Financials 170 67 39% 170 0 0%
Current Year Financials 170 67 39% 67 (103) -61%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-23
Budget is for end of contract retention payment, with remaining budget to be slipped into 22/23 to meet any residual costs.  In-
year final retention payment was less than anticipated, remaining balance to be slipped into 22/23 for budget to meet costs to
resolve a legacy roofing issue.
Mitigating Action
None available at this time.
Anticipated Outcome
Underspend to be slipped into 22/23 to fund a legacy roofing issue.
Improvement works (Risk St)
Risk Street Over clad
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This project overspent in 21/22 due to a high demand on necessary essential works.  There has been a larger number of
renewals and referrals in 21/22 than anticipated at time of budget setting, resulting in an overspend on the current year budget.
Mitigating Action
This budget is for essential work and is demand led so difficult to mitigate.
Anticipated Outcome
Overspend in 21/22.
Heating improvement works
Carry out works to renew inefficient boilers/full systems as identified from the stock condition
survey and renewal of obsolete/damaged boilers.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Page 272

Page 273

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
7
Project Life Financials 5,400 1,036 19% 6,069 669 12%
Current Year Financials 1,706 1,036 61% 1,036 (670) -39%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
8
Project Life Financials 16,430 2,105 13% 16,430 0 0%
Current Year Financials 4,088 2,105 51% 2,105 (1,983) -49%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
9
Project Life Financials 2,540 710 28% 2,675 135 5%
Current Year Financials 575 710 123% 710 135 23%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Budget is overspent, installation progress has improved overall and programme has been pushing to increase completion
Mitigating Action
None available at this time, pushing to reduce waiting list and increase completions.
Anticipated Outcome
Project to complete as planned over budget
Special needs adaptations
Adaptations to Housing for Special Needs 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Building external component renewals, roofs/chimneys/flashings/fascias/gutters/svp
Building external component renewals
Anticipated Outcome
Remaining budget will be required to be slipped into 22/23.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Roof renewal programme continues.  Monthly tracking is behind cumulative targets however additional installs by support
contractor is underway and this should help with completions.  Recent completions incorporating those by support contractor
are showing an improving position however it is was not possible for full budget catch up in 21/22 and remaining budget is
required to be rephased to 22/23.
Mitigating Action
Progress on this will continue to be monitored closely as works continue into 22/23.
Main Issues / Reason for Variance
The main objective of the Buy Back Scheme is to bring former council properties that were sold through the RTB scheme,
back into council use.  These properties must assist the council with reducing housing need on the waiting list and where
appropriate assist with external capital works. For these reasons, any purchase is subject to stringent criteria to ensure
accountability and value for money for existing tenants.  With several key stakeholders involved, this has meant full budget
spend has not been possible in 21/22, with remaining budget required to be carried forward to 22/23.  
Anticipated Outcome
Budget did not fully spend in 21/22 as there were a number of mitigating factors including the prioritisation of staff resource on
new build activities.  Officers will ensure  maximisation of spend to meet project priorities and increased activity in 22/23.
Buy Backs
This is a budget to undertake specific projects that will deliver housing policies/strategies,
example: Ex local authority and mortgage to rent buy-back scheme
Planned End Date Forecast End Date
Mitigating Action
Officers will continue efforts to maximise buy-backs, in an effort to increase delivery of the scheme and positively impact and
minimise slippage.
Page 273

Page 274

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
10
Project Life Financials 1,319 (7) -1% 1,319 0 0%
Current Year Financials 446 (7) -2% (7) (453) -102%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
11
Project Life Financials 17 0 0% 17 0 0%
Current Year Financials 17 0 0% 0 (17) -100%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
12
Project Life Financials 8,645 3,689 43% 10,233 1,588 18%
Current Year Financials 2,101 3,689 176% 3,689 1,588 76%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Void house strategy programme
Spend on Void Properties to bring them up to letting standard
Mitigating Action
None available at this time as this is a demand led programme.
Planned End Date Forecast End Date
Project to overspend due to higher demand.
Anticipated Outcome
Main Issues / Reason for Variance
The high number of voids has led to a higher than expected demand for this budget, resulting in an overspend in 21/22.  Void
Mitigating Action
None available at this time. Officer will continue to progress this project to completion.
Anticipated Outcome
Project to carry into 22-23 for completion and meet spend targets.
Community Safety Projects
Community Safety Projects
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project has experienced some delays whilst managing owner occupiers and other works requiring completion to allow project
to commence, budget is required to be carried into 22/23 for completion.
It is anticipated that the accelerated proposals will result in this budget achieving all targets, but will continue to monitor market
conditions.
Mitigating Action
Officers are actively reprofiling works based on priority assessment within the wider Housing Asset Management Strategy, this
Anticipated Outcome
Better Homes Priority Budget
Priority projects as prioritised by the Better Homes Group
Planned End Date Forecast End Date
Main Issues / Reason for Variance
While pandemic restrictions stalled some proposed initiatives throughout 20/21, it was anticipated that this would be less
impacted throughout 21/22, however Officers have experienced a number of issues in relation to supply and materials that
have curtailed progress particularly on new workstream.  Nevertheless, a number of priority initiatives, supported by the Better
Homes Project Board,  are already being investigated and are envisaged to have a positive impact on the current council
housing stock and budget is required to be slipped to 22/23 to carry out these works.
Page 274

Page 275

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
13
Project Life Financials 1,104 317 29% 1,211 107 10%
Current Year Financials 210 317 151% 317 107 51%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
14
Project Life Financials 5,100 0 0% 5,100 0 0%
Current Year Financials 300 0 0% 0 (300) -100%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Progress on this programme will be closely monitored on a regular basis through the Better Homes Project Board.
Anticipated Outcome
MSF Fire Risk Assessment Works
High Rise Fire Safety Measures
Planned End Date Forecast End Date
Project to complete over budget..
Asbestos management works
None required at this time.
Main Issues / Reason for Variance
An update report on this project was on the agenda for 27th October 2021 Council.  This advised that the expected spend on
replacing Spandrel panels will no longer be required but instead a variety of issues affecting Multi Stories will be reviewed and
incorporated into the 2022 High Rise strategy.  This resulted in approval to vire the underspend of £0.900m to the statutory/
regulatory compliance works project to offset the overspend related to the smoke detector installation programme.  The
reamining 21/22 budget of £0.300m is required to be carried forward to 22/23 £0.300m for MSF Fire Risk Assessment Works.
Mitigating Action
None available at this time.
Anticipated Outcome
This budget is to fund work associated with the management of current asbestos legislation
Planned End Date Forecast End Date
Mitigating Action
Main Issues / Reason for Variance
Budget overpsend in current year due to higher than expected demand.
Page 275

Page 276

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT AMBER STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 1,583 1,241 78% 1,792 209 13%
Current Year Financials 1,136 1,241 109% 1,241 105 9%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
2
Project Life Financials 304 93 31% 304 0 0%
Current Year Financials 125 93 74% 93 (32) -26%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
3
Project Life Financials 379 52 14% 279 (100) -26%
Current Year Financials 200 52 26% 52 (148) -74%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Budget underspent due to owner involvement slowing down authorisation of work. Ongoing challenges with owner agreements
has impacted the ability to progress installations.
Mitigating Action
On going dialogue with owners will continue in attempts to reach agreements to progress more installations.
Anticipated Outcome
Underspend in 21/22.
Main Issues / Reason for Variance
External stores/garages/bin stores/drainage component renewals
This budget is to focus on external stores/garages/bin stores etc. component renewals as
identified and recommended from the housing stock condition survey.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Spending has been later than planned due to protracted owner involvement slowing down authorisation of work, remaining
budget to be slipped to 22/23.
Secure entry component renewals
This budget is to focus on secure door entry component renewals as identified and
recommended from the housing stock condition survey and appropriate council officer
referrals.
Planned End Date Forecast End Date
Mitigating Action
On going dialogue with owners will continue in order to get this work approved.
Anticipated Outcome
Underspend to be slipped into 22/23.
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Statutory/regulatory compliance works (lifts/electrical/legionnella/fire etc)
This budget will be used to upgrade / replace components / installations in order to comply
with the relevant standards / legislation / health and safety in relation to housing stock.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The works in relation to the smoke detector installation programme has been continuing in connection with gas heating annual
servicing.  An issue regarding the level of budget available was identified in that installation costs have been higher than
anticipated at time of budget setting.  In response to this budget issue, a virement was carried out to increase the budget of the
statutory/ regulatory compliance works project by £0.900m, which has reduced the overspend in 21/22.
Mitigating Action
These works are necessary and virement was required to mitigate overspend on budget.
Anticipated Outcome
Project to complete over budget as works are necessary and a legislative requirement.
Page 276

Page 277

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT AMBER STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
4
Project Life Financials 2,480 764 31% 2,553 73 3%
Current Year Financials 691 764 111% 764 73 11%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
5
Project Life Financials 26 29 112% 29 3 12%
Current Year Financials 26 29 112% 29 3 12%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
6
Project Life Financials 5,089 1,420 28% 5,220 131 3%
Current Year Financials 1,289 1,420 110% 1,420 131 10%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Environmental renewal works, paths/fences/walls/parking area's
Environmental renewal works, paths/fences/walls/parking areas
Main Issues / Reason for Variance
Demand for budget higher than expected as works progress resulting in a small overspend in 21/22.
Anticipated Outcome
Overspend incurred.
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
None required at this time.
QL Development
This budget relates to the costs associated with the development of the Integrated Housing
Anticipated Outcome
Project to complete as planned.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Some minor acclerated spend to support the Repairs and Maintenance functionality of the system.
Mitigating Action
Budget is overspent, resultant capitalised spend was more than anticipated and higher demand.
Mitigating Action
None available at this time.
Anticipated Outcome
Project to complete over budget.
Forecast End Date
Capitalised minor works
This is a budget to undertake specific minor ad hoc capital projects that arise on demand
Planned End Date
Main Issues / Reason for Variance
Page 277

Page 278

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 91 81 89% 91 0 0%
Current Year Financials 91 81 89% 81 (10) -11%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
2
Project Life Financials 100 0 0% 0 (100) -100%
Current Year Financials 100 0 0% 0 (100) -100%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
3
Project Life Financials 20,504 4,736 23% 20,504 0 0%
Current Year Financials 5,076 4,736 93% 4,736 (340) -7%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Main Issues / Reason for Variance
No mitigation required at this time.
Main Issues / Reason for Variance
All spend in this area this year will be heating so will be met from heating improvement budget.
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
Anticipated Outcome
Project complete within budget.
Gypsy Travellers Site
Gypsy/ Traveller Site improvements
Planned End Date Forecast End Date
This budget is made up of Scottish Government grant which requires to be legally committed to improvement works on existing
Gypsy Travellers sites by the end of March 2022.  Initially the funding should have been committed a year earlier but as a
result of the pandemic the timeline has been extended across Scotland.  A condition of the grant requires that spend mirrors
tenant priorities, and as such we have had a number of consultative engagements with the existing community to assess
priorities. Works are now complete and upon allocation of support costs, project completed on budget.
Mitigating Action
Mitigating Action
None required at this time.
Anticipated Outcome
Main Issues / Reason for Variance
Underspend which will partially offset overspend in heating improvement budget.
Targeted EESSH compliance works
This budget enables the council's continued commitment to achieving the Government's
standards in relation to energy efficiency.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
Project to complete as planned and maximise spend.
Targeted SHQS compliance works
This budget is to focus on work required to maintain the SHQS compliance with WDC housing
stock.
Planned End Date Forecast End Date
EWI programme continues to progress and work to continue into 22/23 to complete. Caution should remain with regards to
emerging COVID issues and the effect that may have on labour and materials supply chain. Remaining budget to carry over
into 22/23 for completion.
Page 278

Page 279

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN STATUS
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
4
Project Life Financials 4,003 1,309 33% 3,992 (11) 0%
Current Year Financials 1,320 1,309 99% 1,309 (11) -1%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
5
Project Life Financials 331 0 0% 224 (107) -32%
Current Year Financials 108 0 0% 0 (108) -100%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
6
Project Life Financials 500 19 4% 500 0 0%
Current Year Financials 100 19 19% 19 (81) -81%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
7
Project Life Financials 12,776 2,372 19% 12,693 (83) -1%
Current Year Financials 2,455 2,372 97% 2,372 (83) -3%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Mitigating Action
None required at this time.
Anticipated Outcome
Project to complete as planned and meet spend targets.
This is a contingent budget for unforeseen matters which may arise during the year.
Anticipated Outcome
Underspend which will partially offset overspend in heating improvement budget.
Budget to spend as required.
Contingencies
Salaries/central support/offices
Modern facilities and services
Anticipated Outcome
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Officers continue to monitor output and maximise performance and spend, however a small carry forward to 22/23 is required.
Main Issues / Reason for Variance
Little demand for this budget in 21/22, however required to be carried forward should the need arise in 22/23 to utilise budget.
Energy improvements/energy efficiency works
Energy improvements/ efficiency works (e.g. loft insulation, pipe/tank insulation, draught
exclusion)
Planned End Date Forecast End Date
Mitigating Action
New Kitchens, Bathrooms and Showers
Additional back-up contracts in place to assist in delivery.
Anticipated Outcome
Planned End Date Forecast End Date
Main Issues / Reason for Variance
All spend in this area this year will contribute to increased efficiency heating so was met from heating improvement budget.
Project to complete as planned and meet spend targets.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Underspend on salaries reacharged to HRA Capital in 21/22.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Allocation of costs from other WDC services who support the HRA capital programme
Page 279

Page 280

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 12
Budget Forecast/ Actual
Spend
£000 £000 % £000 £000 %
1
Project Life Financials (39,600) (1,562) 4% (40,623) (1,023) 3%
Current Year Financials (5,000) (909) 18% (909) 4,091 -82%
Project Description
Project Lifecycle
31 March 2022
Budget Details
Project Life Financials
Spend to Date Variance
None required at this time.
Anticipated Outcome
The project life overall variance will be favourable by £1.023m due to additional Scottish Government Grant Income.
Grant to facilitate the building of new build housing 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Overall, there is a favourable project life variance of £1.023m which relates to additional grant income successfully negotiated
by Officers in relation to the increased grant per unit at Aitkenbar, Haldane and Dumbarton Harbour and the additional grant
generated from the buyback scheme.  Current year adverse variance of £4.091m relates to new builds which are not expected
to progress until next financial year.
Mitigating Action
NEW BUILD GRANT
Page 280

Page 281

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
TRANSFORMATIONAL PROJECTS TO BE FUNDED/ PART FUNDED FROM CAPITAL RECEIPTS - 2021/22
Original per
Council
March 2021 
Reported to
Council 9
March 2022 
Revised
following
year end
Name and detail of project Details of expected costs Estimated cost
to implement in
2021/22 in
2021/22 budget 
TOTAL
projected cost
in 2021/22 as at
p10 BCR 
TOTAL cost in
2021/22
Details of expected savings   Value of expected savings 
£  £  £  £
Digital Transformation within the Council -
implementation of the Council’s Digital Strategy that
maximises the potential of digital technologies to
improve outcomes and services for all our citizens
and employees, whilst seeking to reduce our costs.
The end benefits expected include: Digital by
default approach for all council services; Alignment
of Council services with leading mobile
technologies and the benefit therein giving due
consideration to end users; Maximise digital
transactions via self-service and reduced need for
Face-to-Face and Phone interventions where
possible; Digital services designed with end users
in mind through regular engagements during
design and delivery phases; Improved ICT
foundations to inform Investment Programmes;
Costs for the project include staffing costs for a team of four digital
transformation officers, some external payments for training of
various staff throughout the council and allocation of service staffing
directly involved in the digital transformation of the Council.
199,444 259,357 201,977 The project is an enabler for continued identification of
efficiencies through a number of strands, including Lean Six
Sigma (LSS) projects. With the embedding of the LSS within the
organisation and a number of employee LSS champions, further
projects continue to be identified and progressed, which will
identify further savings. Examples of such projects which have
been completed to date include: review of invoice processing;
review of file sharing between the some Council teams and
external parties; review of start up grant claim processes; review
of ICT delivery model in educational establishments; review of
Senior Phase Partnership Provider Course Selection (Schools).
Other strands being taken forward as part of the overall
digitalisation project include: Zoom Council/ Committee
meetings; Digital Skills training for staff; MS teams and M365;
automation.
The project commenced during 2019/20 and in 2020/21
continued to review and implement change to service
provision and commenced the Fit for Future approach to
significant service reviews aimed at implementing change
in processes and procedures with the aim of maximising
the digital approach to information gathering and
processing. Savings targets not set, but as Fit for Future
reviews are finalised efficiencies will be identified and
contribute to future cost reductions within the Council. The
fact that the project is an enabler indirect savings require
to be identified, as well as those saving which are directly
attributable to each sub-project. Efficiencies generated will
be report at future financial year-end and through
budgetary control reporting
Further strands of Digital Transformation - ie
automation within the Council
Costs for the project include staffing costs for the automation
projects and some external payments for IT and software. 
100,000 197,088 181,330 The project is an enabler for continued identification of
efficiencies through automating a range of existing processes. A
first phase is currently underway and a pipeline of future
processes has been developed and will also link with the
outcomes from the Fit for Future reviews
The list of projects commenced during 2020/21 and
continued into 2021/22 . As the projects are at an early
stage, the saving targets for the overall spend haven't yet
been fully explored and identified, but will develop as each
project strand develops. The fact that the project is an
enabler, indirect savings will be achieved, as well as those
savings which are directly attributable to each sub-project.
The savings will be reported as part of the year end
process and future budgetary control reporting.
Restructures within the Council -  to allow
services to complete non-teacher non-frontline
staffing restructures with a view to reducing costs
without reducing services to the public.
Costs include voluntary early retirements/ voluntary redundancies. It
is noted that discretionary costs for early retirement added years
cannot be funded by capital receipts and are excluded. Although
these costs are one off, there are continuous costs for different
restructures.
227,000 70,000 -   Future ongoing staffing savings following removal of non
teaching posts within the organisation. The restructures which
have been costed within 2021/22 include restructures within
various services and annual savings are assumed within future
budgets.
Ongoing savings annually through reduced staffing will be
identified through staffing restructures and reported at the
year end. Those staff identified for voluntary early
retirement and voluntary redundancies will be through
Cost Benefit Analysis
Total to be set against capital receipts in 2021/22 526,444 526,445 383,308
Page 281

Page 282

DR A K GLEN & WEST
DUNBARTONSHIRE TRUST
FUNDS
DRAFT ANNUAL REPORT AND FINANCIAL
STATEMENTS FOR THE YEAR ENDED 31 MARCH 2022
Page 282

Page 283

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022
2 | P a g e
Contents
Pages
Contents 2
Trustees’ Annual Report 2 – 6
Statement of Receipts and Payments 7
Statement of Balances 8
Note to the Accounts 9 – 10
Page 283

Page 284

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022
3 | P a g e
Trustees’ Annual Report
Introduction
The Trustees present the annual report together with the Financial Statements for the year ended
31 March 2022.
Administration Information
West Dunbartonshire Council (the Council) is sole Trustee for all Trust Funds with the exception
of Dunbartonshire Educational Trust Scheme 1962 and McAuley Prize for Mathematics.  The
table below identifies the Trustees for 2021/22. 
Trust Funds Charity Number Trustees Local Authority Contact Address
Dr A K Glen SC018701 Councillor Karen Conaghan
Councillor David McBride
Councillor Ian McLaren
Councillor Brian Walker
SC025070 Provost William Hendrie
Councillor John Mooney
Councillor Jim Brown
Councillor Marie McNair
Councillor Diane Docherty
Councillor Jim Finn
Councillor Daniel Lennie
Councillor Douglas McAllister
Councillor Lawrence O’Neill
UIE Award SC025070 Councillor Jim Brown
Councillor Ian Dickson
Councillor Diane Docherty
Councillor Jim Finn
Councillor Daniel Lennie
Councillor Caroline McAllister
Councillor David McBride
Councillor Jonathon McColl
Councillor Iain McLaren
Councillor John Mooney
Councillor Martin Rooney
Dunbartonshire
Education Trust
Scheme 1962
SC025070 Councillor Karen Conaghan West Dunbartonshire
Council
McAuley Prize for
Mathematics
SC025070 Councillor John Mooney West Dunbartonshire
Council
Bailie Denis Agnew West Dunbartonshire
Council
Councillor Graham Archibald Hardie Argyll & Bute Council
Councillor John Jamieson East Dunbartonshire
Council
Councillor Gillian Fannan North Lanarkshire
Council
Councillor Thomas Johnston North Lanarkshire
Council
West Dunbartonshire
Council, Council
Offices, Church Street,
Dumbarton, G82 1QL
West Dunbartonshire
Council
West Dunbartonshire
Council, Council
Offices, Church Street,
Dumbarton, G82 1QL
Alexander Cameron
Bequest
West Dunbartonshire
Council
West Dunbartonshire
Council, Council
Offices, Church Street,
Dumbarton, G82 1QL
West Dunbartonshire
Council
West Dunbartonshire
Council, Council
Offices, Church Street,
Dumbarton, G82 1QL
Page 284

Page 285

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022
4 | P a g e
Objectives and 2021/22 Activity
All trusts are advertised on the Council’s website and details have been passed to West
Dunbartonshire Community and Volunteering Service (WDCVS) to publicise them.  However, due
to the COVID pandemic, a number of voluntary groups who would normally consider applying for
grants were not active. Consequently, other than the DR A K Glen and the Alexander Cameron
Bequest, no Trusts met during 2021/22.
The objectives and activities of each of the Trusts are detailed below:
Charity
Number
Trust Fund Objective 2021/22 Activity
SC018701 Dr A K Glen Fund The benefit of the people of
Dumbarton, to assist and relieve
those in need by reason of age.
Only one grant application
was received in year.
Following consideration it was
concluded the application met
the Fund objectives and a
£19,800 award was made.
SC025070 Alexander
Cameron
Bequest
The benefit of the people of
Clydebank to assist those in
need by reason of age, ill health,
disability, financial hardship or
other disadvantage.
No awards were made, with
the Trust meeting only once to
agree a Strategy on
investments.
SC025070 UIE Award For students studying
apprenticeships or training in
industry.
No awards but work to review
and modernise the Trust’s
governance arrangements to
encourage funding
applications in the future has
been progressed
SC025070 Dunbartonshire
Educational Trust
Scheme 1962
Awards educational prizes and
bursaries.
No awards for either. 
Trustees continue to seek
clarification as to amendments
to the governance
arrangements. As these
Trusts are governed by
statute, discussions are
ongoing between the Council
(as Administrator) and
Scottish Ministers and Office
of the Scottish Charity
Regulator (OSCR) regarding
these arrangements
SC025070 McAuley Prize for
Mathematics
Provides prizes for those
studying maths and computing
Structure and Governance
Dr A K Glen and West Dunbartonshire Trust Funds are OSCR registered. The governance
arrangements are under the control of the Council which appoints trustees as required. Currently,
trustees are elected members of the Council with the exception of the Dunbartonshire Education
Trust Scheme 1962 and McAuley Prize for Mathematics. The trustees of these two are elected
Page 285

Page 286

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022 
5 | P a g e
members from West Dunbartonshire Council, Argyll & Bute Council, East Dunbartonshire Council
and North Lanarkshire Council. 
Following a review of the governance documents, it was agreed at Council on 31 August 2016 that
the Trust Funds noted below would be delegated to sub-committees as follows: 
Trust Delegation
Alexander Cameron Bequest Alexander Cameron Committee 
Dr A K Glen Fund Dumbarton Trust Sub-Committee 
The trustees have overall responsibility for ensuring there are appropriate systems of control,
financial and otherwise.  They are also responsible for keeping proper accounting records which
disclose, with reasonable accuracy, the financial position of the Trusts and enable them to ensure  
Financial Statements comply with Charities Accounts (Scotland) Regulations 2006. They are also
responsible for safeguarding the assets of the charity and are therefore responsible for taking
reasonable steps to prevent and detect fraud and other irregularities and also provide reasonable
assurances that: 
 The trusts are operating efficiently and effectively.
 Assets are safeguarded against unauthorised use and disposition.
 Proper records are maintained and financial information used by the charities is reliable.
 The trusts comply with relevant laws and regulations. 
The systems of internal controls are designed to provide reasonable, but not absolute, assurance
against material misstatement or loss. The systems of internal control follow those of the Council 
and, as such, much of this is delegated to the Council’s Chief Officer - Resources.  The Council
continually seeks to improve the effectiveness of its systems of internal control so that any
irregularities are either prevented or quickly detected. The systems of internal control are based on
a framework of regular management information, financial regulations, financial and administrative
procedures (including segregation of duties), management supervision and a system of delegation
and accountability. 
The Financial Statements and Trustees Report are prepared by the Council’s Finance Service. 
The appointed external auditors are Audit Scotland. The Council has agreed to meet the cost of
this audit and not pass this on to the Trusts. This is to provide additional financial support to the
Trusts, ensuring that core funds are not eroded, and objectives can continue to be achieved. 
The Trustees only meet as and when required during the year and will ensure that the required
accounting arrangements are adhered to.   
Management of Funds and Investment Policy 
Decisions regarding the management of the Trusts are made by the Trustees. Trustees rely on the
expertise of Council staff to manage the investments to ensure the maximum return at the least
risk to the Trusts. In this way, the income stream for the future benefit of the Trusts is protected. 
Funds available are invested each year with interest earned. Investments are made both internally
and externally, with the majority invested in the Council’s Loans Fund and externally managed by
the Council.
Page 286

Page 287

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022 
6 | P a g e
Performance (Investments) 
Income for Dr A K Glen & West Dunbartonshire Trusts comes from investment returns. All Trusts
(with the exception of those investments noted below) received income on their reserves held
based upon the average interest rate used for internal investments within the Council’s loans fund
was 0.063%. 
Following a Trustee decision in 2019/20, Alexander Cameron had an element of their funds in a
fixed interest agreement (2.52%). Trustees met and agreed in February 2022 to continue this
investment for a further fixed term of 2 years (the revised interest rate was 2.04%) and the overall
impact of this was £2,492 of interest gained during 2021/22. 
Dunbartonshire Educational Trust Scheme 1962 continues to receive income from external
investments i.e. 3% Clydeport and 4% Clydeport Consolidated Stock.  These investments are
managed by the Council and achieved investment income of £5 in 2021/22 (£5 in 2020/21). 
Financial Review 
The total balance on the Trusts as at 31 March 2022 (including stocks) is £262,584.   
On 8 July 2016 Clydeport Operations Ltd delisted 3% and 4% stocks from the London Stock
Exchange. These are stocks held by Dumbarton Educational Trust. Until further information is
available it has been assumed that the balance of this stock has remained the same as the
previous year (£218). 
The Trusts held cash and bank balances at 31 March 2022 of £262,366. Reserves are held by the
Council on behalf of the Trusts and revenue income, generated from investment interest that has
not been disbursed at 31 March every year, is invested in line with the investment policy outlined
above. 
Declaration 
The financial statements above were authorised for issue on behalf of the Trustees on 28 April
2022 by: 
Councillor Jonathan McColl
West Dunbartonshire Council
28 April 2022
Page 287

Page 288

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022
7 | P a g e
Statement of Receipts and Payments Account
Receipts
2020/21
Payments
2020/21
(Surplus) /Deficit
2020/21
Receipts
2021/22
Payments
2021/22
(Surplus) /Deficit
2021/22
£ £ £ £ £ £
(232) 0 (232) Dunbartonshire Educational Trust Scheme 1962 (62) 0 (62)
(55) 0 (55) McAuley Prize for Mathematics (14) 0 (14)
(2,138) 0 (2,138) Alexander Cameron Bequest (2,492) 0 (2,492)
(62) 0 (62) Dr AK Glen (16) 19,800 19,784
(62) 0 (62) UIE Award (16) 0 (16)
(2,549) 0 (2,549) Total (2,600) 19,800 17,200
Page 288

Page 289

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022 
8 | P a g e
Statement of Balances as at 31 March 2022 
Opening Balance   
2020/21
(Surplus)
/Deficit   
2020/21
Closing
Balance   
2020/21 Note Cash and Bank
Opening
Balance   
2021/22
(Surplus)
/Deficit   
2021/22
Closing
Balance   
2021/22
£ £ £ £ £ £
(90,201) (232) (90,433) Dunbartonshire Educational Trust
Scheme 1962
(90,433) (62) (90,495)
(21,829) (55) (21,884) McAuley Prize for Mathematics (21,884) (14) (21,898)
(115,638) (2,138) (117,776) Alexander Cameron Bequest (117,776) (2,492) (120,268)
(24,670) (62) (24,732) Dr AK Glen (24,732) 19,784 (4,948)
(24,679) (62) (24,741) UIE Award (24,741) (16) (24,757)
(277,017) (2,549) (279,566) Total Cash and Bank (279,566) 17,200 (262,366)
Investment
(218) 0 (218) 5 Dunbartonshire Educational Trust
Scheme 1962
(218) 0 (218)
(218) 0 (218) Total Investment (218) 0 (218)
(277,235) (2,549) (279,784) Overall Total (279,784) 17,200 (262,584) 
All funds are unrestricted which means they may be used for any purpose relevant to the Trust
Fund. 
The audited Financial Statements were issued on x June 2022. 
Signed on behalf of the Trustees by:- 
Councillor Jonathan McColl
West Dunbartonshire Council
X June 2022 
Page 289

Page 290

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022 
9 | P a g e
Notes to the Financial Statements 
Note 1 - Basis of Accounting 
The Financial Statements have been prepared on a receipts and payments basis and in
accordance with the Charities & Trustee Investment (Scotland) Act 2005 and the Charities
Accounts (Scotland) Regulations 2006.   
Note 2 – Trustee Remuneration, Expenses and Related Party Transactions 
 No remuneration or expenses were paid to the Trustees or any connected persons during the
2021/22.
 The Trusts received interest of £2,595 from the Council at 31 March 2022, and all transactions
incoming and outgoing are made via the Council’s bank accounts.
 The Council has not charged the Trusts any fees for legal, financial or administrative services
provided during the year. 
Note 3 – Grants 
Due to the COVID pandemic, only one grant was awarded in 2021/22. 
Note 4 – Cash and Bank Balances 
During the year the Trust’s balances were held by the Council, which manages the administration
of the funds on behalf of the Trustees. No costs were incurred by the Trusts for this administration.
The Council also acts as the banker for the Trusts and, as detailed above, all transactions
incoming and outgoing are made via the Council’s accounts. The balances are repayable on
demand. Interest is paid on balances. 
Note 5 – Investment 
Dunbartonshire Educational Trust - The investment valuation of £218 (shown in the table below) is
the market value as at 31 March 2016, as valued by the Council. Notification was received that the
stocks were delisted in July 2016. There has been no further update on this and therefore the
assumption is that the market price remains the same.   
Purchase
Price as
at 31
March
2021
Market
Price as
at 31
March
2021    Investment
Purchase
Price as at
31 March
2022
Market
Price as at
31 March
2022   
£ £ £ £
(289) (199) 4% Clydeport authority (289) (199)
(35) (19) 3% Clydeport Authority (35) (19)
(324) (218) Total (324) (218) 
Page 290

Page 291

Dr A K Glen and West Dunbartonshire Trust Funds
Draft Financial Statements for the year ended 31 March 2022
10 | P a g e
Alexander Cameron – Following a decision on 23 February 2022, £20,000 was invested on a short
term variable basis, with the remainder invested on a longer term fixed interest rate basis with the
Council for two years at 2.04%. 
Note 6 – Audit Fee
The audit fee for the year of £2,100 (£2,100 2020/21) was absorbed by the Council.
Page 291

Page 292

DUMBARTON COMMON GOOD FUND APPENDIX 8
Statement of Income & Expenditure to 31 March 2022
20/21 21/22 21/22
Final Outturn Budget Final Outturn
Description £ £ £
Alcoholics Anonymous - Grant for Property 9,699 8,000 5,805
Alternatives 5,000 5,000 5,000
Bellsmyre Digital Project 35,602 35,601 35,602
Bellsmyre Schools Out 3,500 6,000 8,500
Bellysyre Development Trust 36,000 36,000 36,000
Christmas Lights 15,000 15,000 15,000
Dumbarton Senior Citizens 10,000 10,000 10,000
Dumbarton Fireworks - 9,050 -
Town Centre Management - Capital - 168,771 26,224
Rockvale Rebound - Rent 2,600 2,630 2,630
Scottish Maritime Museum 50,000 50,000 50,000
Small Grants - 7,000 -
West Dunbartonshire Citizen's Advice Bureau 40,000 40,000 40,000
Central Admin Allocation 14,000 14,000 14,000
Estates Dept - Management Fee 10,840 10,840 10,840
Total Expenditure 232,234 417,892        259,602
Interest on Revenue Balance / Investments (1,161) (1,100) (360)
Misc  Income
Rental Income (313,621) (310,000) (319,912)
Total Income (314,782) (311,100)       (320,272)
Net Expenditure (82,548) 106,792        (60,671)
Balance b/fwd (438,094) (493,027) (520,642)
Balance c/fwd (520,642) (386,235)       (581,312)
Page 292

Page 293

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 31 August 2022
___________________________________________________________________
Subject: General Services Budgetary Control Report to 31 July 2022
(Period 4)
1. Purpose
1.1 This report provides an update on the General Services revenue budget and
the approved capital programme to 31 July 2022.
2. Recommendations
2.1 Council is asked to:
i) note a current projected annual adverse variance on the revenue
account of £0.318m (0.13% of total budget);
ii) note that projected expenditure on the capital account is lower than the
2022/23 budget by £14.140m (21.56% of budget), made up of
£12.260m (18.69% of budget) of project slippage, and an in-year net
underspend of £1.880m;
iii) agree the virement as requested at 4.13 (appendix 9); and
iv) agree the acceleration as requested at 4.14 (appendix 10).
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council (the Council) on 9 March
2022, Members agreed the revenue estimates for 2022/2023. A total net
budget of £231.919m was approved for General Services, before use of
balances.
3.2 Since the budget was agreed, additional funding has been provided by the
Scottish Government (SG) and a further allocation of covid funds results in a
revised total net budget of £252.394m is now being monitored:
£m
Budget as set – Council 9 March 2022 251.693
SG – Easter Provision Fund 0.101
Covid Reserves (Council June 2022) – Cost of Living Crisis 0.600
252.394
Reserves
3.3 The General Fund balance at 31 March 2022 can be analysed as follows:
Item 14
Page 293

Page 294

Balance at
31/3/22 (£m)
Balance on General Fund as at 31 March 2021 15.028
Change to General Fund balance at end of
2021/22
(0.008)
Earmarked Balances (11.524)
Contingency allowance at 2% of net expenditure (3.123)
Unallocated Balance as at 31 March 2022 (draft) 0.373
Capital
3.4 At its 9 March 2022 meeting the Council also agreed the updated General
Services Capital Plan for 2022/2023 to 2030/31.  The three years from
2022/23 to 2024/25 were approved in detail with the remaining years being
indicative at that stage. After adjusting for anticipated slippage from 2021/22
into 2022/23, the budget agreed for 2022/23 was £48.058m.   
3.5 Since then, budget adjustments have taken place (through further 2021/22
capital slippage and additional external funding), revising the 2022/23 annual
budget to £65.587m, as follows:
£m
Base Budget 2022/23 (before slippage) 33.471
Slippage from 2021/22 – March 2022 18.035
Increase capital budget from 9 March 2022 Council meeting:
Changing Places Toilets 0.050
Roads and Pavements 2.000
Flood Prevention 0.500
Street Sign Renewal 0.100
Children & Families Team TBC
Christmas Lighting TBC
Large Bins for High Traffic Areas 0.025
Pothole Rapid Repair Service TBC
Anticipated budget 2022/23 (Council – March 2022) 54.181
Additional slippage from 2021/22 – following year end 7.593
New Funding introduced to Period 4
CFCR (HSCP) 0.010
District Heating Consultancy 0.120
SG – Clyde Walking, Safer Streets 0.566
SG – Nature Restoration Fund 0.126
Place Based Investments 0.676
SPT – Kilbowie Road Bus Route 0.495
SPT – Congestion Reduction Measures 0.330
SPT – Balloch Station Park and Ride 0.050
SPT – Bus Infrastructure Improvements 0.200
Cost of Living Crisis (Council June 2022) 1.000
Acceleration of Schools Estate Improvement Plan (assumed) 0.240
Revised budget – Period 4 65.587
Page 294

Page 295

4. Main Issues
Revenue
4.1 The summary report at Appendix 1 highlights a projected annual adverse
variance (overspend) of £0.318m (0.13% of the total budget). Appendix 2
provides more detailed service reports by Chief Officer.
4.2 This adverse variance is made up of:
£m
COVID related variance 0.176
Less available COVID funding (0.176)
Remaining COVID related variance 0.000
Non-COVID variance 0.318
Total variance 0.318
4.3 Information on projected annual variances in excess of £0.050m are
highlighted and noted within Appendix 3, with additional information on action
being taken to minimise or mitigate overspends where possible.
4.4 Agreed management adjustments (Appendix 4) actioned within 2022/23 are
monitored with current indications showing that the amount being monitored is
£0.276m with £0.251m on target to be fully achieved.
Covid reserves held 
4.5 As at 31 March 2022 the Council carried forward £3.302m for future general
covid spend. Some of these available funds have been committed, with
£0.468m remaining for future budget pressures.
Earmarked
£m
Free
£m
Total
£m
Covid balances as at 31 March 2022 2.058 1.244 3.302
Cost of Living Crisis (Council June 2022) 0.600 (0.600) 0
Funding of general covid spend (P4 BCR) 0.176 (0.176) 0
Balance as at 31 July 2022 2.834 0.468 3.302
Reserves
4.6 The Council’s General Fund contingency is set at 2% of net expenditure for
2022/23 and amounts to £3.123m. At the beginning of 2022/23 (as per
paragraph 3.3) there was £0.373m of unallocated General Fund Balance
(over and above contingency). After taking into consideration the impact on
the General Fund of the decisions agreed by Council in June 2022 and the
forecast outturn position at 31 July 2022, the Council is currently forecast to
have a £0.055m surplus over contingency as at 31/03/2023.
Page 295

Page 296

Detail Balance at
31/3/22
£m
Unallocated Balance as at 31 March
2022
This is the balance that is
unallocated over and above
the 2% contingency, which
amounts to £3.123m
0.373
Impact on the  General Fund of the
2022/23 Budget decisions  on free
reserves
£0.600m allocated to cost of
living from covid funds – nil net
effect on free reserves
0
Current Forecast Outturn for
2022/23 as at 31 July 2022
(0.318)
Projected Unallocated Balance as
at 31 March 2023
0.055
Capital
4.7 The current progress on the capital plan is shown in Appendices 5 to 9. 
4.8 The overall programme summary report at Appendix 5 shows that planned
2022/23 expenditure is lower than the 2022/23 budget by £14.140m (21.56%
of budget), made up of £12.260m (18.69% of budget) of project slippage, and
an in-year net underspend of £1.880m.  
4.9 Appendix 5 also provides an analysis of the overall programme at each alert
status and a summary budgetary control report including detailing the number
of projects and corresponding spend as a percentage of the overall
programme currently at red, amber or green alert status for project life and the
current year.  The current projections are based on best judgement as to how
these projects will continue in operation during the remainder of the year.
4.10 Appendices 6 and 7 detail the financial analysis of projects at red and green
status respectively (no amber projects currently) and provide additional
information on action being taken to minimise or mitigate under or overspends
where possible. Appendix 8 provides an analysis of resources.
4.11 From the analysis within the appendices it can be seen there are a number of
projects with identified slippage to date. Those with slippage valued at greater
than £0.500m, are listed as follows:
Project Name
Period 4
Slippage (£m)
Levelling Up Fund (4.614)
Vehicle Replacement (2.217)
West Bridgend CC (1.063)
Vehicle Replacement Strategy (1.000)
Viresco Studios and Arts Centre (750)
Page 296

Page 297

4.12 For comparison purposes, a summary of the monthly slippage position is
noted below:
Period 4
£m £m
Overall capital plan 65.587
Slippage (12.260)
Net over/ under (1.880)
Overall variance (14.140)
% slippage 18.69%
4.13 Appendix 9 provides details of a virement request of £0.066m between two
projects, with the reason for the request noted.
4.14 Appendix 10 provides details of a request for an acceleration of a budget
approved for 2023/24 being brought forward into 2022/23, with the reason for
the request noted.
5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications.
7. Financial and Procurement Implications
7.1 The report notes the projected in-year financial position for both General
Services revenue and capital budgets.
8. Risk Analysis
8.1 The main risks are as follows:
(a) The present variances should be viewed in the knowledge that there are
a number of variable factors which could arise between now and 31
March which could affect the year end results for both the revenue and
capital budgets – particularly in light of ongoing COVID issues;
(b) As a consequence of current market conditions, capital receipts may
either not be received or they may be less than anticipated. The budget
assumption is that a significant sum of capital receipts achieved in
2022/23 will be used to fund transformational projects and the principal
and premium repayments within the loan charges budget. Any shortfall in
capital receipts below that budgeted will affect the revenue budget
Page 297

Page 298

position. This is being closely monitored and any issues will be reported
to Council; 
(c) As a consequence of current market conditions, inflation is at an all-time
high and interest rate continue to rise. To forecast for the full year costs
budget assumptions have been required (particularly around energy and
interest costs). These assumptions continue to change regularly and
therefore it is likely that the projected year end budgetary position will
change from that reported;
(d) COVID related variances are based upon estimates regarding the likely
annual values and are subject to further review. The cost of COVID
currently projected is based upon a variety of assumptions including:
known available funding; financial flexibilities; ongoing service
restrictions and service demand. These assumptions continue to change
regularly and therefore it is highly likely that the projected year end
budgetary position will change from that reported.
9. Equalities Impact Assessment (EIA)
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 All services involved in delivering the revenue and capital budgets have been
consulted in the compilation of this report. 
12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council.
__________________
Laurence Slavin
Chief Officer – Resources
Date: 18 August 2022
__________________________________________________________________
Person to Contact: Gillian McNeilly, Finance Manager
Council Offices, Church Street, Dumbarton
E-mail: gillian.mcneilly@west-dunbarton.gov.uk
Appendices: Appendix 1 - Revenue Budgetary Control 2021/22
– Corporate Summary;
Page 298

Page 299

Appendix 2 - Revenue Budgetary Control 2021/22
– Chief Officer Summaries;
Appendix 3 - Analysis of Revenue Variances over
£50,000;
Appendix 4 - Monitoring of Efficiencies and Management
Adjustments 2022/23
Appendix 5 - Overall Capital Programme Summary;
Appendix 6 - Analysis of Projects at Red Status;
Appendix 7 - Analysis of Projects at Green Status;
Appendix 8 - Analysis of Capital Resources;
Appendix 9 -  Analysis of virement;
Appendix 10 - Analysis of acceleration request.
Background Papers: General Services Revenue Estimates 2022/23
General Services Capital Plan Update - Council 9 March
2022.
Wards Affected   All Wards
Page 299

Page 300

Page 300

Page 301

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2022/23
SUMMARY
PERIOD END DATE 31 July 2022
Total Budget Spend to Date Projected Spend
Annual
RAG
Status
Net Variance
attributable to
covid*
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
Resources 5,522 3,378 5,545 23 0%  0 23
Regulatory and Regeneration 3,141 1,455 2,991 (150) -5%  0 (150)
People & Technology 7,142 3,036 6,937 (205) -3%  0 (205)
Citizens, Culture and Facilities 17,940 6,363 17,930 (10) 0%  3 (13)
Education, Learning and Attainment 108,286 36,710 108,331 45 0%  0 45
Roads and Neighbourhood 14,602 8,194 15,050 448 3%  0 448
5,315 1,751 5,290 (25) 0%  0 (25)
Supply, Distribution and Property (2,730) (327) (2,821) (91) 3%  69 (160)
Miscellaneous Services 8,082 1,899 8,156 74 1%  103 (29)
Loan Charges 9,518 3,301 9,903 385 4%  0 385
Capital Receipts used to fund Loan Charges (2,884) (149) (2,884) 0 0%  0 0
Requisition (VJB) 765 255 765 0 0%  0 0
Requisition (SPT) 1,632 544 1,632 0 0%  0 0
Requisition (CJP) 1,694 565 1,694 0 0%  0 0
Requisition (HSCP) 81,698 27,233 81,698 0 0%  0 0
Non GAE Allocation (7,328) (2,443) (7,328) 0 0%  0 0
Contingency Fund 0 0 0 0 0%  0 0
Total Expenditure 252,394 91,765 252,888 494 0%  176 318
Council Tax (38,126) (9,471) (38,126) 0 0%  0 0
Revenue Support Grant/ NDR (209,167) (96,088) (209,167) 0 0%  0 0
Covid Funding (specific and earmarked from 2021/22) (3,367) (1,122) (3,367) 0 0%  0 0
Required use of available unearmarked  covid funds 0 0 (176) (176) 0%  (176) 0
Capital Receipts used to fund Transformation (700) 0 (700) 0 0%  0 0
Use of Reserves (1,034) (345) (1,034) 0 0%  0 0
Total Resources (252,394) (107,026) (252,570) (176) 0%  (176) 0
Net Expenditure (0) (15,261) 318 318 0.13%  0 318
Department Summary Variance
Housing and Employability
Page 301

Page 302

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
RESOURCES SUMMARY
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
132 116 107 (25) -19%  0 (25)
1,398 499 1,431 34 2%  0 34
(341) 950 (341) 0 0%  0 0
2,168 989 2,217 49 2%  0 49
303 88 312 9 3%  0 9
19 (13) 10 (9) -48%  0 (9)
(790) (92) (790) 0 0%  0 0
Central Administration Support 2,633 842 2,599 (34) -1%  0 (34)
5,522 3,378 5,545 23 0%  0 23
Variance
Service Summary
Service / Subjective Summary
Finance Business Centre
Audit
Revenues & Benefits
Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Page 302

Page 303

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
788 241 769 (19) (0)  0 (19)
790 223 751 (39) (0)  0 (39)
(97) (10) (120) (23) 0  0 (23)
933 294 806 (127) (0)  0 (127)
482 190 534 52 0  0 52
Economic Development 245 518 251 7 0  0 7
3,141 1,455 2,991 (150) (0)  0 (150)
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Democratic and Registration Service
Legal Services
Licensing
Environmental Health
Planning
Page 303

Page 304

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
719 243 733 14 2%  0 14
1,327 369 1,289 (38) -3%  0 (38)
4,529 2,281 4,418 (111) -2%  0 (111)
567 143 497 (70) -12%  0 (70)
7,142 3,036 6,937 (205) -3%  0 (205)
Variance
Total Net Expenditure
Transactional Services
Change Support
Information Services
Human Resources (including risk)
Service / Subjective Summary
Service Summary
Page 304

Page 305

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
333 83 333 (0) 0%  0 (0)
1,285 426 1,283 (2) 0%  3 (5)
357 82 336 (21) -6%  0 (21)
Clydebank Town Hall 458 22 464 5 1%  0 5
Office Accommodation 1,275 243 1,278 3 0%  0 3
Libraries 1,811 498 1,814 3 0%  0 3
Arts and Heritage 371 93 350 (21) -6%  0 (21)
Catering Services 4,454 1,307 4,527 73 2%  0 73
Building Cleaning 1,703 769 1,637 (66) -4%  0 (66)
Building Cleaning PPP (331) (135) (331) 0 0%  0 0
Facilities Assistants 2,100 662 2,116 16 1%  0 16
Facilities Management 396 103 396 (0) 0%  0 (0)
Leisure Management 3,638 2,121 3,639 1 0%  0 1
Events 89 88 89 0 0%  0 0
17,940 6,363 17,930 (10) 0%  3 (13)
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy
Page 305

Page 306

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Primary Schools 31,800 9,969 31,604 (195) -1%  0 (195)
Secondary Schools 30,984 10,596 31,097 113 0%  0 113
Specialist Educational Provision 16,611 4,611 16,651 40 0%  0 40
Psychological Services 571 203 571 0 0%  0 0
Sport Development / Active Schools 627 209 627 0 0%  0 0
Early Education 8,415 4,324 8,409 (6) 0%  0 (6)
PPP 15,395 5,612 15,452 57 0%  0 57
Creative Arts 620 222 621 0 0%  0 0
Curriculum for Excellence 202 23 202 0 0%  0 0
Central Admin 852 487 855 3 0%  0 3
Workforce CPD 349 87 349 0 0%  0 0
Performance & Improvement 453 120 453 0 0%  0 0
Education Development 1,407 247 1,440 33 2%  0 33
Raising Attainment - Primary 0 0 0 0 0%  0 0
Raising Attainment - Secondary 0 0 0 0 0%  0 0
Pupil Equity Fund (including LAC PEF) 0 0 0 0 0%  0 0
108,286 36,710 108,331 45 0%  0 45
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure
Page 306

Page 307

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Transport, Fleet & Maintenance Services (592) 51 (499) 93 -16%  0 93
Roads Services 2,932 1,306 2,940 8 0%  0 8
Grounds Maintenance & Street Cleaning Client 7,503 2,501 7,503 0 0%  0 0
Outdoor Services 187 55 169 (17) -9%  0 (17)
Burial Grounds (193) (158) (219) (26) 13%  0 (26)
Crematorium (1,031) (240) (988) 43 -4%  0 43
Waste Services 8,036 2,224 8,275 239 3%  0 239
Depots 0 87 0 0 0%  0 0
Ground Maintenance & Street Cleaning Trading A/c (2,240) 2,367 (2,131) 108 -5%  0 108
14,602 8,194 15,050 448 3%  0 448
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure
Page 307

Page 308

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net
Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
Working 4 U 3,327 938 3,328 1 0%  0 1
Communities 1,051 266 1,019 (32) -3%  0 (32)
Homeless Persons 436 437 440 4 1%  0 4
Private Sector housing 32 0 35 3 9%  0 3
Anti Social Behaviour 469 110 468 (1) 0%  0 (1)
5,315 1,751 5,290 (25) 0%  0 (25)
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 308

Page 309

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
SUPPLY, DISTRIBUTION AND PROPERTY
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable to
covid
Underlying
Variance
excluding covid
£000 £000 £000 £000 % £000 £000
Housing Maintenance Trading A/c (1,401) (483) (1,414) (13) 1%  0 (13)
Housing Asset and Investment 81 11 31 (50) -62%  0 (50)
Corporate Assets and Capital Investment Programme (2,196) (344) (2,319) (123) 6%  69 (192)
482 244 479 (3) -1%  0 (3)
(266) (15) (206) 60 -23%  0 60
Private Sector Housing Grants 79 (58) 80 1 1%  0 1
Consultancy Services 491 318 528 37 7%  0 37
(2,730) (327) (2,821) (91) 3%  69 (160)
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Corporate Asset Maintenance
Procurement
Page 309

Page 310

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2022/23
MISCELLANEOUS
PERIOD END DATE 31 July 2022
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
Net Variance
attributable
to covid
Underlying
Variance
excluding
covid
£000 £000 £000 £000 % £000 £000
5,715 1,133 5,860 145 3%  103 46
620 202 620 0 0%  0 0
510 170 510 0 0%  0 0
1,237 394 1,166 (71) -6%  0 (71)
8,082 1,899 8,156 74 1%  103 (25)
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
European Employability
Service Summary
Sundry Services
Members Allowances, etc
Page 310

Page 311

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
Legal Services 933 806 (127) -14% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Planning 482 534 52 11% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Information Services 4,529 4,418 (111) -2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Change Support 567 497 (70) -12% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Overspend is anticipated
No action can be taken at this time
31 July 2022
Budget Details
Variance Analysis
Variance
Underspend is anticipated
This services provides legal advice to the Council
The main reason for the favourable variance is  vacancies and additional
income received.
No action can be taken at this time
Regulatory and Regeneration
None required at this point.
This service area provides general ICT support to the Council and also
supports transformational change and modernisation of working practices
through technology
Underspend is projected.
There are two variances within this budget. Supplies and Services is
favourable due to computer licence costs projected to cost less than
budgeted. Favourable staffing costs due to vacancies are also
contributing to the overall favourable position.
The main reason for the adverse variance is that income is lower than
budgeted due to cancelled or delayed building projects and Employee
costs are favourable due to staff vacancies.
People & Technology
This Service provides Building & Planning services
This Service enables transformational change and development, it also
has the Central Training Budget for the Council.
An underspend is anticipated
Employee costs are favourable due to vacancies.
None required
Page 311

Page 312

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 July 2022
Budget Details
Variance Analysis
Variance
Catering Services 4,454 4,527 73 2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Building Cleaning 1,703 1,637 (66) -4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Primary Schools 31,800 31,604 (195) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
None necessary
The reason for the favourable variance is the number of ongoing
vacancies
A review of the overtime position going forward is underway
This service provides cleaning services across all council buildings
Citizens, Culture and Facilities
Catering Services across WDC
Main reason for the variance are a one off charge for the early termination
charges for contract for vending machines and a higher level of overtime
than predicted
None required at present
Overspend is anticpated
Underspend likely
Education , Learning and Attainment
The favourable variance on employee costs may decline as vacancies are
filled. There is the potential for the upward pressure on utility costs to
increase although the additional income from FSM should offset the
consequences of these pressures.
This service area includes all Primary Schools.
The budget was set before the delay to free school meal expansion was
confirmed. As primaries 6 & 7 will now not be covered by universal free
school meal provision income from school meals will be significantly
above the budgeted target income (£170k)  The increase clothing grants
(£10k) has been offset by a favourable variance on employee costs
(£25k) and property costs (£22k)
Page 312

Page 313

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 July 2022
Budget Details
Variance Analysis
Variance
Secondary Schools 30,984 31,097 113 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
PPP 15,395 15,452 57 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Transport, Fleet & Maintenance
Services (592) (499) 93 -16% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The adverse variance has arisen due to water rates and contract cleaning
costs being greater than when the budget was set due to the level of
inflation on particular lines.
Management will continue to review the service and take action where
appropriate to minimise the overspend.
adverse variance anticipated
small adverse variance anticipated
Roads and Neighbourhood
This service area includes all Secondary Schools.
This service area includes Vale of Leven, Clydebank High and St Peter
the Apostle High Schools and St Eunan's Primary School. The costs
charged to this service are Property costs and the Unitary charge.
Income from sale of school meals is currently projected to be less than
budgeted (£85k) due to a fall in demand.  The remaining adverse
variance is due primarily to a small overspend on employee costs (25k)
Management will continue to review the service and take action where
appropriate to minimise the overspend. School meals income depends on
higher uptake from August.
The level of internal recharges is under review
There is a favourable variance (£46k) against employee costs due to a
number of vacancies. However this is more than offset by higher fuel
costs (£150k), which will follow through to higher recharges to services.
Favourable variance from diesel recharges is less than the adverse
variance from higher prices as initial income target was too high.
Transport services across WDC
Surplus slightly less than target
Page 313

Page 314

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 July 2022
Budget Details
Variance Analysis
Variance
Waste Services 8,036 8,275 239 3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Ground Maintenance & Street Cleaning
Trading A/c (2,240) (2,131) 108 -5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Housing Asset and Investment 81 31 (50) -62% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Waste Collection and Refuse disposal services
none possible at present
Employee costs are higher (£168k) as projected savings from waste
route optimisation ,which depend on operating from a single depot, are
not yet achievable . Expenditure on bin replacements is higher (£71k) ,
skip hire (£7k) and electricity (£8k) are greater than anticipated when the
budget was set. These have been partly offset by reduced vehicle hires
(£34k).
Overspend anticipated
Property costs are adverse due to increased gas/electricity costs (£15k).
Fuel (£50k) , tyres (£15k) and plant/seed costs (£29k) have increased to a
level not anticipated when the budget was set.
Trading operation providing grounds maintenance and street cleaning
services
An adverse variance is anticipated
This service manages capital investment across council and private
sector housing stock.
Supply, Distribution and Property
This variance is mainly due to employee costs from vacant posts within
the service. This is partially offset by a reduction in the level of income
being recharged to the Housing Revenue Account.
None Required
Underspend forecast at year end
None possible at this time
Page 314

Page 315

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 July 2022
Budget Details
Variance Analysis
Variance
Corporate Assets and Capital
Investment Programme (2,196) (2,319) (123) 6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Corporate Asset Maintenance (266) (206) 60 -23% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Sundry Services 5,715 5,860 145 3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome An overall adverse variance is anticipated at this time
Income and expenditure will continue to be monitored throughout the
year.
Miscellaneous
This service area budgets for non departmental specific costs such as
pensions costs, external grants and elderly welfare payments, external
audit fees and insurance costs. The service heading also holds a number
of general savings options which have still to be fully allocated.
After removing the effects of the general covid budget (£103k) which will
be required to be funded from unearmarked covid funds, the main
adverse variance is the level of procurement savings achieved to date
Income and expenditure will continue to be monitored throughout the
year.
The main areas of variances include an over recovery of income of £35k
within the estates management service and also a favourable variance on
employee costs of due to vacancies.
Favourable variance anticipated at year end
Surplus to be less than target 
Lower than budgeted income due to a reduced programme of CAMS
work delivered by subcontractor partners
None - Although service will endeavour to reduce the adverse variance
where possible through service efficiency
This service manages and undertakes repairs and maintenance to public
buildings
This service provides asset and estate management
Page 315

Page 316

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected
Spend RAG Status
£000 £000 £000 %
31 July 2022
Budget Details
Variance Analysis
Variance
Chief Executive and Chief Officers 1,237 1,166 (71) -6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Loan Charges 9,518 9,903 385 4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Required use of available unearmarked 
covid funds 0 (176) (176) 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The adverse variance is linked with forecast on the cost of short term
borrowing with increased interest rates
Management will continue to monitor and maximise actions taken to
reduce any adverse variance, where possible.
Other
This budget covers the servicing of the Council's external borrowing
An adverse variance is anticipated
Favourable outturn expected.
This budget includes spend relating to the Senior Management Team of
the Council
Any variance will be offset by covid adverse variances within services, or
carried forward for future years allocation against covid costs
The main variance is due to a Chief Officer vacancy .
None required
This represents the funding from Scottish Government specifically for
covid and additional spend identified outwith specific  Council Services
The variance is funding service related covid costs
Income and expenditure will continue to be monitored throughout the
year.
Page 316

Page 317

WEST DUNBARTONSHIRE COUNCIL
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2022/23 Appendix 4
Efficiency Detail Chief Officer Area budgeted
Amount £
Projection of
Total Saved £
Projection of
Total Not Saved
£
Comment
Reduce costs of franking machines Amanda Graham 8,000 - 8,000 Action is underway and an element of this saving is
likely to be achieved by the year end, however not
guaranteed at this stage.
Review Rental Structure for Ashton View Supported
Accommodation Project
Peter Barry 21,000 21,000 -
Reduce costs of storing supply of rock salt Gail McFarlane 44,000 44,000 -
Reduce costs with use of pooled vehicles Gail McFarlane 60,000 60,000 -
Reduce Teacher costs Laura Mason 35,467 35,467 -
Increased income - Housing Maintenance Trading
Account (HMTA) / Corporate Asset Maintenance
(CAMS)
Angela Wilson 108,000 91,000 17,000 The CAMS income is lower than expected due to
reduced programme of work. This will continue to
be monitored and update if the situation changes
276,467 251,467 25,000
Page 317

Page 318

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
PERIOD END DATE
PERIOD 4
Spend to Date Spend to
Date
£000 £000
Red
25 21.2% 33,964 36.9% 25 21.2% 895 30.4%
Amber
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Green
93 78.8% 58,000 63.1% 93 78.8% 2,053 69.6%
118 100% 91,964 100% 118 100% 2,949 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Actual
Variance Slippage Over/ (Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
65,866 33,964 65,697 (169) 16,510 895 5,000 (11,510) (10,772) (738)
0 0 0 0 0 0 0 0 0 0
205,657 58,000 203,603 (2,054) 49,077 2,053 46,447 (2,630) (1,488) (1,142)
271,523 91,964 269,300 (2,222) 65,587 2,949 51,447 (14,140) (12,260) (1,880)
(271,523) (91,964) (269,300) 2,222 (65,587) (2,949) (51,447) 14,140
0 0 0 0 0 0 0 0
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 July 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of Projects
at RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at RAG
Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Page 318

Page 319

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 9 0 0% 9 0 0%
Current Year Financials 3 0 0% 0 (3) -100%
Project Description
Project Manager David Thomson
Chief Officer David Thomson
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials 0 3 0% 3 3 0%
Current Year Financials 0 3 0% 3 3 0%
Project Description
Project Manager David Thomson
Chief Officer David Thomson
Project Lifecycle 31-Mar-23 31-Mar-23
3
Project Life Financials 33 0 0% 33 0 0%
Current Year Financials 33 0 0% 0 (33) -100%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Legal Case Management System
Legal Case Management System
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
Requisition ICT Equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget remains unspent and is likely to be carried forward into FY 23/24.
Mitigating Action
Valuation Joint Board - ICT Refresh FY 22/23
Replacement of laptops, monitors and other ICT equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Replacement of laptops, monitors and other ICT equipment. No further spend anticipated.
Mitigating Action
None available at this time.
Anticipated Outcome
Replacement of laptops and ICT equipment
None available at this time.
Anticipated Outcome
Requisition of ICT Equipment.
Forecast End Date
Main Issues / Reason for Variance
Budget has been rephased from 2021/22.  The project could not proceed as originally planned as Officers are required to access the
office and hardware the system will run on and COVID-19 restrictions have prevented this.  The project will have to go back out to
tender following the upgrade to Microsoft 365.  The project will not be completed in this financial year. 
Mitigating Action
Legal to discuss impact of Microsoft 365 with ICT.
Anticipated Outcome
Project to be completed in 2023/24.
Planned End Date
Page 319

Page 320

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment4
Project Life Financials 61 3 5% 64 3 5%
Current Year Financials 55 0 0% 58 3 5%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
5
Project Life Financials 342 237 69% 347 5 1%
Current Year Financials 110 0 0% 20 (90) -82%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
6
Project Life Financials 80 19 24% 80 0 0%
Current Year Financials 61 1 1% 30 (31) -51%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Main Issues / Reason for Variance
Further orders have been raised and await invoices. Total expenditure this financial year estimated to be £0.030m with the rest of the
funding to be carried forward into next financial year.
Mitigating Action
None available at this time
Anticipated Outcome
Anticipate some spend this year and the remainder to be rephased into 2023/24.
Forecast End Date
Mitigating Action
Opportunities to mitigate are limited at this stage.
Anticipated Outcome
Complete in 2022/23.
Energy Projects quick wins
Spend to Save projects.
Planned End Date Forecast End Date
Installation of Solar PV at Clydebank Leisure Centre
Installation of Solar PV at Clydebank Leisure Centre.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Await chimney inspection report and appointment of consultant for HUB CEC. Due to complications in installing heat pump anticipate
only design fees spend this year and release of the retention for works at St Marys Primary School, Alexandria.
Mitigating Action
None available at this time.
Anticipated Outcome
Retention for St Mary's Primary School and design fees this year. Insufficient budget available to carry out Hub works.
Main Issues / Reason for Variance
Technical scope delayed due to prioritising controls upgrade. Aim to pass tender document to Procurement by the end of August
2022.
Replace obsolete boilers (plant greater than 30 years old).
Replace obsolete boilers (plant greater than 30 years old).
Planned End Date
Page 320

Page 321

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment7
Project Life Financials 344 86 25% 344 0 0%
Current Year Financials 258 0 0% 15 (243) -94%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
8
Project Life Financials 160 0 0% 160 0 0%
Current Year Financials 152 0 0% 80 (72) -47%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
9
Project Life Financials 750 0 0% 0 (750) -100%
Current Year Financials 750 0 0% 0 (750) -100%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Dec-22 30-Jun-23
Upgrade obsolete heating controls (BEMS) across Council estate
Upgrade obsolete heating controls (BEMS) across Council estate.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Tender documentation currently being prepared. Work scheduled between October 2022 and March 2023 but suspect it will carry
forward into the new financial year due to necessary disruption to heating in the buildings.
Mitigating Action
None available at this time.
Anticipated Outcome
Delivery of project within budget.
Anticipated Outcome
Project delivered within budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works initiated to install a heat pump to complement HUB CEC boiler. Liaising with BAM FM and Asset Management to decide which
site to install solar PV following successful installation at St Peters. Works will cross into next financial year.
Mitigating Action
None available at this time
Zero Carbon Fund
Zero Carbon Fund.
Viresco Studios and Arts Centre
Viresco Studios and Arts Centre in Alexandria, aimed to encourage wider participation in the arts,
creative enterprises and cultural activity in West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Due to factors outwith the Council's control, progress couldn’t be made on a timeline that would be acceptable to funders and as a
result Scottish Government will withdraw the grant offer.
Mitigating Action
None available at this time.
Anticipated Outcome
Repurposing and restoration of B listed former St Andrew's church in Alexandria for community arts uses.
Page 321

Page 322

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
10
Project Life Financials 22,100 1,807 8% 22,100 (0) 0%
Current Year Financials 7,465 39 1% 2,851 (4,614) -62%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
11
Project Life Financials 382 388 102% 388 6 2%
Current Year Financials 0 6 0% 6 6 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-21
12
Project Life Financials 2,375 87 4% 2,375 (0) 0%
Current Year Financials 1,090 3 0% 28 (1,063) -97%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-24
Mitigating Action
None available at this time.
Anticipated Outcome
New build community facility.
New Westbridgend Community Centre
New Westbridgend Community Centre
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Various delays due to Covid and other utility issues. Planning was previously delayed but now resolved. Building warrant applications
will be submitted August 2022 with a view to tender being issued December 2022. Anticipated to be onsite by April 2023.
Mitigating Action
None available at this time.
Anticipated Outcome
New sports changing facility completed.
New Sports Changing Facility at Duntocher
New Sports Changing Facility at Duntocher
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project completed over budget due to ground conditions on site.  Final costs now charged.
LUF
Year one LUF spend includes acquisition cost of Artizan Centre, and design development for
Glencairn House and Connecting Dumbarton
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Connecting Dumbarton and Glencairn House are progressing per the agreed programme. A future programme for the Artizan Centre
based on the Redevelopment Options consultancy will be reported to IRED, after which proposed in year spend may be adjusted.
Costs will continue to be monitored by the LUF Project Board. Update due to IRED September 2022
Mitigating Action
None available at this time.
Anticipated Outcome
Redevelopment of the Dumbarton Town Centre
Page 322

Page 323

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment13
Project Life Financials 400 47 12% 400 0 0%
Current Year Financials 357 3 1% 100 (257) -72%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Oct-23 31-Oct-23
14
Project Life Financials 2,646 3,118 118% 3,210 565 21%
Current Year Financials 844 752 89% 844 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
Posties Park Sports Hub - New sports hub to include gym & running track
Creation of a sports hub at Posties/Marinecraft to include a new changing pavilion/Gym, new all-
weather 6 lane running track, conversion of blaze sports pitch to grass, new fencing, upgrade of
existing floodlights and additional car parking.  This combines the budget approved by the Council
in February 2015 for Community Sports Facilities at Posties Park, draw down of budget from the
generic sports facilities budget line.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project start was delayed due to planning issues and COVID-19 restrictions. Work commenced January 2021 with a proposed
completion date of March 2022 which has been extended to October 2022 due to design changes required by Planning. There is still a
significant amount of work to be undertaken to complete the project and the cost of this work has been affected by Brexit and supply
chain issues. A forecast is uncertain at this time pending discussions and negotiations with the contractor.
Mitigating Action
None required at this time.
Anticipated Outcome
New all weather running track and gymnasium.
Anticipated Outcome
Two new allotment sites with 80 plots and community growing space.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Two sites are being developed at Dillichip Loan Bonhill and Overburn Dumbarton. These sites will provide eighty traditional allotment
plots together with community food growing facilities. It is anticipated that project works will commence in February 2023 with a
completion date of October 2023.
Mitigating Action
None available at this time.
Allotment Development
To develop an allotment site.
Page 323

Page 324

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment15
Project Life Financials 817 263 32% 817 (0) 0%
Current Year Financials 553 0 0% 150 (403) -73%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 30-Sep-22
16
Project Life Financials 217 3 1% 217 0 0%
Current Year Financials 214 0 0% 0 (214) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
17
Project Life Financials 400 358 90% 400 0 0%
Current Year Financials 42 0 0% 0 (42) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Main Issues / Reason for Variance
Road construction works completed in previous years. Remaining funds are insufficient to complete footpath construction. Works on
hold until such time as additional funds can be secured.
Mitigating Action
None available at this time.
Anticipated Outcome
To complete remaining civil works required.
Main Issues / Reason for Variance
Project is now being developed for tendering, with project commencing February 2023 and completion expected by 31 October 2023.
It is anticipated that £0.150m will be spent this financial year mainly on consultant costs and enabling works.
Mitigating Action
None available at this time.
Anticipated Outcome
Extension to existing cemetery providing a sustainable burial environment.
Vale of Leven Cemetery Extension
Extension of existing cemetery in Vale of Leven.
Planned End Date Forecast End Date
Anticipated Outcome
To improve journey times and reliability of bus services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Officers working with external partners to identify projects to support funding. Investigation on going however unlikely works will be
able to progress this financial year.
Mitigating Action
None required at this time.
Bus Rapid Deployment Fund
Funding has been awarded from Sustrans to assist with social distancing measures required as a
result of the COVID-19 pandemic.
Auld Street Clydebank - Bond
Completion of roadworks associated with Auld Street housing development. Creation of a footpath
to Golden Jubilee Hospital.
Planned End Date Forecast End Date
Page 324

Page 325

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment18
Project Life Financials 500 11 2% 500 0 0%
Current Year Financials 220 0 0% 0 (220) -100%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
19
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 0 (1,000) -100%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
20
Project Life Financials 2,817 0 0% 2,817 0 0%
Current Year Financials 2,817 0 0% 600 (2,217) -79%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Vehicle Replacement
Replacement of vehicles which have reached end of programmed lifespan (7 year heavy vehicles,
10 year light vehicles).
Project to be delivered within budget.
Awaiting Scottish Government recommendations.
Mitigating Action
None available at this time.
Anticipated Outcome
Mandatory 20mph Residential communities
Mandatory 20mph Residential communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Replacement of fleet within budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Vehicles are being ordered for delivery in this financial year but larger vehicles will be delayed into financial year 2023/2024.
Mitigating Action
None Required.
Replacement of refuse collection vehicles.
Anticipated Outcome
Vehicle Replacement Strategy
Replacement of refuse collection vehicles.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Larger vehicles will be delayed due to supply chain issues. Delivery timescales anticipated at 18 months.
Mitigating Action
None available.
Anticipated Outcome
Page 325

Page 326

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment21
Project Life Financials 199 223 112% 199 0 0%
Current Year Financials 9 34 354% 34 25 258%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Oct-22 31-Oct-22
22
Project Life Financials 924 0 0% 924 0 0%
Current Year Financials 154 0 0% 40 (114) -74%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
23
Project Life Financials 1,400 0 0% 1,400 0 0%
Current Year Financials 280 0 0% 40 (240) -86%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None available at this time.
Anticipated Outcome
Community Alarm Upgrade
Replacement of Care First
Replacement of Care First
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The replacement of CareFirst has been delayed because of challenges in respect of the recruitment of a Digital Business Lead to take
forward the project. Work is ongoing with HR colleagues in order to consider how the recruitment challenge may be addressed.
Mitigating Action
None available at this time
Anticipated Outcome
Replacement of Care First
Anticipated Outcome
Project delivered within amended timescales.
Free School Meals
Provision of Capital Funding from Scottish Government to implement free school meal initiative.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project is complete other than snagging works which can only be completed when school is closed however project end date is still on
target. Additional budget required in relation to electrical phasing which was unknown at the time of project inception.
Mitigating Action
None available at this time
Community Alarm upgrade
To upgrade Community Alarm
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Work is ongoing with HR colleagues in order to appoint a project manager to this post and it is anticipated that spend will progress in
the final half of the financial year.
Page 326

Page 327

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT RED ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment24
Project Life Financials 27,531 27,266 99% 27,531 0 0%
Current Year Financials 42 55 130% 55 13 30%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-22 31-Mar-22
25
Project Life Financials 379 42 11% 379 (0) 0%
Current Year Financials 0 0 0% 46 46 0%
Project Description
Project Manager Arun Menon
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-30 31-Mar-30
Project complete with a slight overspend due to additional works required in relation to roof vents which required to be installed.
Main Issues / Reason for Variance
Mitigating Action
The statement of final account has been signed and financial risk exposure should be reduced through efforts to dispose of the
existing properties at the earliest opportunity.
Anticipated Outcome
Dumbarton Care Home opened 2017.  Clydebank Care Home was certified complete on 9 November 2020.
Replace Elderly Care Homes and Day Care Centres
Design and construction of replacement elderly care homes and day care centres in Dumbarton
and Clydebank areas.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Work continues on developments resulting in some spend in the current year
Mitigating Action
None required.
Anticipated Outcome
Development of Workforce Management System.
Development of Workforce Management System
Project to develop the Workforce Management System.
Planned End Date Forecast End Date
Page 327

Page 328

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
2
Project Life Financials 50 43 86% 51 1 1%
Current Year Financials 7 0 0% 8 1 10%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
3
Project Life Financials 40 5 12% 40 (0) 0%
Current Year Financials 35 0 0% 35 0 0%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 30-Sep-23 30-Sep-23
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Payment Card Industry Data Security Standard (PCIDSS)
Module would ensure that WDC were compliant with the current requirements of PCIDSS for card payments
without the need for numerous costly workarounds
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget was rephased to 2022-23 as version upgrade of the Council's cash receipting system is required beforehand and is currently underway.
Anticipated Outcome
Upgraded Electronic Insurance System.
Enhancements to Cash Receipting System
Main Issues / Reason for Variance
Budget rephased to 2022-23 as this is a number of mini projects and the first part is the version upgrade which is actively progressing. After this
upgrade we can move onto other enhancements which are anticipated to finish in September 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Enhancements to the cash receipting system including PCI compliant telephone payment system.
To enhance the cash receipting system in the way payments are made and allocated to back office by
increasing the level of security that is required for online payments made by customers
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The various claim forms and departmental reports have been reviewed and updated and the relevant online request forms were submitted to the
Digital Sub-Group to be converted to Online Achieve Forms.  The various claim forms and departmental reports have now been converted to
Online Achieve Forms and are in the process of being tested. Once complete, the supplier will take matters forward with their design team. An
anticipated timeline for completion of the project, taking into account the various stages i.e. development, testing, going live etc. will be drawn up
in conjunction with the supplier at that time.  Budget spend anticipated in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Upgraded version with PCI compliant telephone payment system.
Electronic Insurance System
Acquisition of a claims/incident management system supported by an electronic document management
system.
Page 328

Page 329

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
4
Project Life Financials 60 5 8% 60 0 0%
Current Year Financials 25 0 0% 25 0 0%
Project Description
Project Manager Adrian Gray
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 31-Oct-22
5
Project Life Financials 5 0 0% 5 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Jackie Nicol Thomson
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
6
Project Life Financials 53 13 25% 53 0 0%
Current Year Financials 33 0 0% 33 0 0%
Project Description
Project Manager Alan Douglas
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Trainee solicitor in place. Budget will be fully spent.
Mitigating Action
None required at this time.
Anticipated Outcome
Solicitor support for Capital Projects, with full budget spend anticipated.
Planned End Date Forecast End Date
Anticipated Outcome
Development of Agresso system later than originally anticipated but within original budget.
Agresso development
The purpose of this project is to carry out an upgrade of the Agresso Finance System which was last
upgraded in 2015. The requirement to upgrade is to maintain a level of support available from Unit 4 who
have advised that support for older versions of the system is being reduced.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Delays in completion of required data cleansing prior to the upgrade have caused the start of the upgrade to be deemed too close to the financial
year end to risk disruption to preparation of the draft final accounts. The upgrade will be delayed until October 2022.
IFRS 16 Database
This is a system which will ensure that WDC has the correct level of information and adheres to correct
reporting of IFRS16 - Leasing. 
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The purchase of software to allow new accounting treatment of leases to be appropriately reported is on track. Full spend anticipated FY
2022/2023.
Mitigating Action
None required
Anticipated Outcome
Purchase of software for accounting for leases.
Main Issues / Reason for Variance
Mitigating Action
None possible at this time.
Solicitor Project Support for Capital Projects
Solicitor costs to directly support capital projects
Page 329

Page 330

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
7
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 10 0 0% 10 0 0%
Project Description
Project Manager Pamela Clifford
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
8
Project Life Financials 83 0 0% 83 0 0%
Current Year Financials 83 0 0% 83 0 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
9
Project Life Financials 20 13 66% 20 0 0%
Current Year Financials 7 0 0% 7 0 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Replace existing main hall Air Handling unit at Clydebank Town Hall.
Mitigating Action
None required.
Anticipated Outcome
Delivery of project with full budget spend.
Replace failed heating controls/valves & recommission
Replace failed heating controls/valves & recommission.
Planned End Date Actual End Date
Main Issues / Reason for Variance
Further works ordered. Expect full spend by 31 March 2023.
Re -imagine Antonine Wall 
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment
Scotland) Rediscovering the Antonine Wall project which is also funded by the Heritage Lottery Fund.
Anticipated Outcome
Physical works being carried out by 31/3/23.
Anticipated Outcome
Preservation of Historic Site.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment Scotland) Rediscovering the Antonine Wall
project will be paid by the end of the financial year.
Mitigating Action
None Required.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works are integrated with the new Baths refurbishment. Await design proposals from Vital for approval. Works to be complete by 31 March 2023
to compliment the district heating installation.
Mitigating Action
None available at this time.
Replace existing main hall Air Handling unit at Clydebank Town Hall
Page 330

Page 331

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
10
Project Life Financials 290 63 22% 290 0 0%
Current Year Financials 216 0 0% 205 (11) -5%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
11
Project Life Financials 85 55 64% 85 (0) 0%
Current Year Financials 30 0 0% 27 (3) -10%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
12
Project Life Financials 16 14 85% 16 0 0%
Current Year Financials 2 0 0% 2 (0) 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
Water Meter Downsize.
Anticipated Outcome
Delivery of project within budget.
Mitigating Action
None required.
Anticipated Outcome
All works to be completed 2022/23.
Automatic Meter Readers - Water
Automatic Meter Readers.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Water meter works to be carried out in the last quarter of the year. Previous works with electricity meter supplier did not meet expectations. Await
resolutions before issuing further orders.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project integrated with Water AMR project. All works to be carried out in the last quarter of the year. Expect full spend.
Mitigating Action
None required
Water Meter Downsize
Anticipated Outcome
All works to be completed next financial year 2023/24.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works to be passed to Consultancy Services and meeting has been arranged. Consultancy Services compiling all elements of the tender
together. Added to procurement pipeline. Finalisation of controls upgrade for centre should be completed by the end of August 2022.
Mitigating Action
All works to be complete in one tender package.
Leisure Energy projects - air handling units, upgrade lighting, circulating pumps, and draught proofing
Measures to be installed at both Meadow Centre & Vale of Leven Swimming Pool; new pool hall Air Handling
Units, upgrade lighting, circulating pumps Vale of Leven Swimming Pool, internal and external lighting and
draught proofing.
Page 331

Page 332

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
13
Project Life Financials 50 0 0% 50 0 0%
Current Year Financials 50 0 0% 50 0 0%
Project Description
Project Manager Steven Milne/ John McKenna
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
14
Project Life Financials 2,188 66 3% 1,651 (538) -25%
Current Year Financials 1,651 66 4% 1,450 (201) -12%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-24
15
Project Life Financials 9,782 4,935 50% 9,797 15 0%
Current Year Financials 2,223 37 2% 2,075 (148) -7%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Progress towards delivery of planned projects from Economic Development Strategy and Charrette Action Plans albeit later than originally
anticipated.
Lighting upgrades to LED in schools and Corporate buildings
Upgrade lighting in schools and corporate buildings.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The remaining Regeneration Fund projects are Dumbarton Waterfront Path; the contribution towards the costs of Glencairn House; Connecting
Dumbarton; and the Scottish Marine Technology Park at the former Carless site. As Levelling Up Fund is programmed to be spent before
Regeneration Fund for Glencairn House and Connecting Dumbarton, it is not anticipated that any Regeneration Fund will be spent on these
projects during this financial year and will be carried forward. Spend against The £2.0m Clyde Mission funding for SMTP will continue during the
financial year 2022/2023 before an agreement is reached on the £2.0m of Regeneration Fund investment. Dumbarton Waterfront Path will be
developed according to landowner timescales, and only some spend is anticipated this year.
Mitigating Action
Programme management approach to delivery.
Mitigating Action
None available at this time.
Anticipated Outcome
Improved town centres and strategic sites across West Dunbartonshire.
Regeneration Fund
Funding to implement major regeneration projects linked to community charrettes. 
Regeneration/Local Economic Development
Budget to facilitate the delivery of Regeneration throughout West Dunbartonshire, aligned to the Economic
Strategy. External funding will be sought to maximise opportunities for redevelopment of these sites.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
LED budget is invested across our town centres and strategic sites and is used to develop and implement projects as well as providing match
funding to lever in external funding. During 2022/2023 the key projects to be developed and delivered include a contribution towards Smollett
Fountain public realm, enabling works at Mitchell Way subject to the timescale of the developer, development costs associated with Dumbarton
Waterfront, the Arc of Attraction Strategy and in Clydebank implementation of the Development Framework and delivery of the Activities Centre.
Many regeneration projects are subject to factors outwith Council control and close monitoring of the programming is required. A contingency is
included for increasing costs and new funding opportunities.
Access to schools has been restricted. Surveys to be initiated this month. Expect full spend by 31 March 2023.
Mitigating Action
None available at this time.
Anticipated Outcome
Works complete 2022/23
Page 332

Page 333

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
16
Project Life Financials 1,166 1,023 88% 1,166 0 0%
Current Year Financials 143 0 0% 143 0 0%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
17
Project Life Financials 1,456 139 10% 1,456 0 0%
Current Year Financials 1,317 0 0% 1,112 (205) -16%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 31-Mar-23
18
Project Life Financials 747 0 0% 747 0 0%
Current Year Financials 747 0 0% 747 0 0%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Dec-22 30-Jun-23
Kier is appointed to design and deliver the Activities Centre at Clydebank Town Centre. Design of the project is underway and a commencement
date for construction is to be confirmed however this will be later than anticipated due to some administrative delays.
Mitigating Action
None available at this time.
Anticipated Outcome
New community-run activities centre in Clydebank Town Centre.
Main Issues / Reason for Variance
New activities centre in Clydebank Town Centre.
Planned End Date Forecast End Date
Town Centre Fund
Scottish Government funding to help improve local town centres.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The remaining Town Centre Fund will be spent on the Smollett Fountain public realm works which will be completed by the end of the financial
year.
Mitigating Action
None available at this time.
Anticipated Outcome
Regenerated Town Centres.
Clydebank Can On The Canal
Mitigating Action
Programme involves  expenditure over a number of projects led by different services. Regular reporting between services will help early
identification of risk.
Anticipated Outcome
Place-based improvements that advance Scottish Government's priorities of 20 min neighbourhoods and carbon zero.
Place Based Investment Programme
Scottish Government Funding to establish a Place-Based Investment Programme to ensure that all place
based investments are shaped by the needs and aspirations of local communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The budget includes a £0.641m contribution to Titan Boulevard at Queens Quay and £0.441m towards implementation of Alexandria Masterplan
projects.
Page 333

Page 334

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
19
Project Life Financials 125 56 45% 125 0 0%
Current Year Financials 69 0 0% 69 0 0%
Project Description
Project Manager Gillian McNamara/ Michael McGuinness
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-23 30-Jun-23
20
Project Life Financials 11,220 0 0% 11,220 0 0%
Current Year Financials 3,720 0 0% 3,720 0 0%
Project Description
Project Manager Patricia Rowley/ Craig Jardine
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-24 31-Mar-24
Main Issues / Reason for Variance
Network expansion to GJNH (Golden Jubilee National Hospital) will commence pending approval to proceed by the GJNH Board. 
Mitigating Action
None available at this time.
Anticipated Outcome
Project will be delivered on budget.
District Heating Network Expansion
District Heating Network Expansion.
Planned End Date Forecast End Date
Levelling Up
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and
transformational regeneration.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This capacity funding was awarded by UK Government to assist with development of LUF bids. WDC has been awarded a grant from LUF
Round 1 and the capacity funding will be used in part to produce Artizan Centre redevelopment options. The balance will be used for
Roads/Transportation to develop a major transportation bid for LUF2.
Mitigating Action
None available at this time.
Anticipated Outcome
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and transformational regeneration.
Page 334

Page 335

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
21
Project Life Financials 34,050 2,760 8% 34,049 (1) 0%
Current Year Financials 986 80 8% 986 (0) 0%
Project Description
Project Manager Patricia Rowley/ Craig Jardine
Chief Officer Peter Hessett
Project Lifecycle 31-Mar-27 31-Mar-27
22
Project Life Financials 15 4 24% 15 0 0%
Current Year Financials 11 0 0% 11 0 0%
Project Description
Project Manager Stephen Daly
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Review of service requirements & telephony functionality will inform works to improve citizen experience.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Improvements to Contact Centre telephony were completed as scheduled during 2021/2022.  Further works have been scoped and agreed for
improvement to Housing telephony, benefiting both residents and the Council.  A review of the out of hours service is currently being undertaken
including work to upgrade telephony.  Any works will also incur professional fees for necessary scripting works.  We are also exploring call
recording technology across all the Contact Centre telephony.  It is anticipated these projects will be completed during the financial year
2022/2023.
Mitigating Action
None required.
Mitigating Action
None required.
Anticipated Outcome
Delivery of the project on time and within the increased budget.
Telephone System Upgrade
To improve Housing Repairs telephone platform for incoming calls, providing improved Management
Information.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Regular updates are provided at every Council meeting and monthly Project Board meetings and to City Deal.  The main issues contained within
the new Council's approved Outline Business Case are still valid, which include Exxon's remediation strategy, land transfer arrangements and
issues relating to adjoining owners.  WDC Consultants are monitoring the remediation process to ensure compliance with specification, also
Esso are independently monitoring the remediation works.  Final Business Case submission is November 2022. Through the Scape framework
we are working closely with Balfour Beatty to achieve a formal pre construction agreement to allow the detailed design works to commence and
the full construction programme to be developed. Agreements in principle are progressing with third party land owners.
Exxon City Deal
As part of the City Deal project the WDC Exxon site at Bowling regeneration with alternative A82 route
included.
Page 335

Page 336

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
23
Project Life Financials 421 232 55% 421 (0) 0%
Current Year Financials 91 3 3% 91 (0) 0%
Project Description
Project Manager David Main
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
24
Project Life Financials 3,987 1,179 30% 4,000 13 0%
Current Year Financials 1,662 (8) 0% 1,662 0 0%
Project Description
Project Manager Sarah Christie/Michelle Lynn
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 31-Mar-23
25
Project Life Financials 1,700 34 2% 1,590 (110) -6%
Current Year Financials 1,590 34 2% 1,590 0 0%
Project Description
Project Manager Michelle Lynn/ Sarah Christie
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
Heritage Capital Fund
Heritage Capital Fund.
Main Issues / Reason for Variance
Work is underway to progress furniture replacement at Dumbarton, Duntocher and Parkhall libraries during 2022/2023.  Budget of £0.1m has
been rephased to  next financial year for Dalmuir library as work is currently scheduled for 2023/2024.
Mitigating Action
None required.
Anticipated Outcome
Project carried forward to align with Asset Management programme.
Main Issues / Reason for Variance
Project in design phase and planning application will be submitted August 2022.
Mitigating Action
None available at this time.
Anticipated Outcome
Re-development of Glencairn House in Dumbarton High Street to a purpose built library and museum, within budget albeit later than originally
anticipated.
Anticipated Outcome
Project to be delivered on budget and within revised timescale.
Glencairn House
Re-development of Glencairn House in Dumbarton High St to a purpose built library and museum.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
None available at this time.
Transformation of Infrastructure Libraries and Museums
To improve performance and efficiency of Council's Libraries and Cultural Services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The original projected spend has been affected by internal and external delays due to the Covid 19 recovery, a reduction in the scope of the
Clydebank Town Hall project, a change in the delivery date for the Clydebank Museum at Clydebank Library during the contract award stage,
while the new Dalmuir Library and Gallery had to be rescheduled for approval in August 2021. Officers are now making progress to get projects
back on track, projects will still be delivered in full, and a review of optimism bias will be undertaken in the projections for 2022/23.
Mitigating Action
Page 336

Page 337

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
26
Project Life Financials 40 0 0% 40 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Manager John Anderson
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-22 31-Mar-23
27
Project Life Financials 8,535 161 2% 8,535 (0) 0%
Current Year Financials 1,715 42 2% 1,715 0 0%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-25 31-Mar-25
28
Project Life Financials 1,912 296 15% 1,912 0 0%
Current Year Financials 1,912 296 15% 1,912 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-23 31-Mar-23
Main Issues / Reason for Variance
Design Team have been appointed to develop feasibility options for the DRP Project, currently in stage 1 of this phase reviewing service
requirements.  The conclusion of the feasibility report will provide input for the options appraisal exercise.  The intention would be to bring a
business case to a future IRED Committee.
Mitigating Action
None available at this time.
Anticipated Outcome
Project business case will be brought back to project board and Council.
Depot Rationalisation
Depot Rationalisation.
Planned End Date Forecast End Date
Anticipated Outcome
Full budget spend anticipated.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing.
Mitigating Action
None available at this time.
Building Upgrades and H&S - lifecycle & reactive building upgrades
Lifecycle and reactive building upgrades.
Mitigating Action
None required
Anticipated Outcome
New floor fitted in Alexandria Community Sports Hall.
Alexandria Community Centre Sports Hall re-flooring
Alexandria Community Centre Sports Hall re-flooring
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The Alexandria Community Centre Sports Hall continues to be utilised as COVID-19 vaccine centre during 2022/23 and the work will be
postponed until the last quarter of the financial year.
Page 337

Page 338

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
29
Project Life Financials 350 9 3% 350 0 0%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-24 31-Mar-24
30
Project Life Financials 150 16 11% 150 0 0%
Current Year Financials 134 0 0% 134 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-21 31-Mar-23
31
Project Life Financials 750 664 89% 750 0 0%
Current Year Financials 86 0 0% 86 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
Main Issues / Reason for Variance
Project now complete awaiting invoices.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered on budget.
Anticipated Outcome
To deliver new sports changing facility.
Holm Park & Yoker Athletic FC
Develop a new 3G pitch to act as a home venue for Clydebank FC with extensive community access.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project had been delayed due to a number of COVID-19 related issues and utilities issues.  Unit is now in production but delay to site due to the
utility disconnection and demolition works. Demolition works complete and waiting for a date for installation.
Mitigating Action
None available at this time.
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
Main Issues / Reason for Variance
The budget for this project has been rephased to FY 2023/2024.
Mitigating Action
None available at this time.
Anticipated Outcome
To deliver new sports changing facility.
New Sports Changing Facility Dumbarton West (Old OLSP site) 
New Sports Changing Facility Dumbarton West (Old OLSP site) 
Planned End Date Forecast End Date
Page 338

Page 339

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
32
Project Life Financials 150 0 0% 150 0 0%
Current Year Financials 150 0 0% 150 0 0%
Project Description
Project Manager Michelle Lynn
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-25 31-Mar-25
33
Project Life Financials 78 0 0% 78 0 0%
Current Year Financials 78 0 0% 78 0 0%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
34
Project Life Financials 45 0 0% 45 0 0%
Current Year Financials 45 0 0% 45 0 0%
Project Description
Project Manager Martin Feeney
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 31-Mar-23
Main Issues / Reason for Variance
It is anticipated that spend will be achieved by the end of the financial year 2022/2023.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within budget.
Anticipated Outcome
Project delivered within budget.
Elevated Platforms (Building Services)
Elevated Platforms (Building Services).
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Welfare Units will be purchased by the end of the financial year.
Mitigating Action
None available at this time.
Purchase of 3 Welfare Units
At Council meeting on 30th August 2017 it was agreed to purchase 3 Welfare Units as a spend-to-save
proposal.
Changing Places Toilet Provision
Changing places toilet provision in four public buildings - Balloch bus stance toilets, Concord Community
Centre, Dalmuir Community Centre and Clydebank East Community Centre.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Plans have been prepared and projects will be progressed by the end of the financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within budget.
Page 339

Page 340

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
35
Project Life Financials 912 849 93% 912 0 0%
Current Year Financials 80 17 21% 80 0 0%
Project Description
Project Manager Elaine Troup
Chief Officer Peter Barry
Project Lifecycle 31-Mar-23 31-Mar-23
36
Project Life Financials 100 23 23% 100 (0) 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Manager Graham Watters
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
37
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 50 0 0% 50 0 0%
Project Description
Project Manager John Kerr
Chief Officer Peter Barry
Project Lifecycle 31-Mar-30 31-Mar-30
Main Issues / Reason for Variance
Project was initially stalled due to COVID-19 restrictions, however as these are easing Officers have now carried out a consultative exercise and
initiated a site inspection to develop the work programme for 2022/2023.
Mitigating Action
Officers carried out some proactive consultative work to establish the tenant priorities this will allow the work programme to be developed
timeously.
Anticipated Outcome
It is expected the works programme  will be completed during 2022/2023.
Anticipated Outcome
Development of IHMS system.
Dennystoun Forge Site Improvements
Dennystoun Forge Site Improvements
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Development of system progressing, with full budget spend anticipated to be incurred in 2022/23.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Full spend is anticipated on this year's budget.
Integrated Housing Management System
Development of IHMS system.
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve coordinated
service delivery in response to community need. This is complimented by community capacity building,
empowering WD citizens to do more for their own communities (leading to less reliance on council).  Also
included is the implementation of participatory budgeting to support and build capacity in communities.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application process is planned for later in this financial year.
Page 340

Page 341

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
38
Project Life Financials 405 7 2% 405 0 0%
Current Year Financials 405 7 2% 405 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
39
Project Life Financials 472 406 86% 472 0 0%
Current Year Financials 66 0 0% 66 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
40
Project Life Financials 1,726 1,718 100% 1,726 0 0%
Current Year Financials 13 5 38% 13 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Mitigating Action
None required at this time.
Anticipated Outcome
Improvements to the environment of West Dunbartonshire.
Environmental Improvement Fund
This fund has been created to deliver environmental improvement projects for communities throughout West
Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Remaining budget rephased from 2021/2022 to progress with tree planting in 2022/2023 in line with the Councils Climate Change and
Biodiversity action plans.  Full budget spend anticipated.
Main Issues / Reason for Variance
This fund has now closed. Funding to be vired to Posties Park project.
Mitigating Action
None required
Anticipated Outcome
Budget to be vired to Posties Park Project.
Community Sports Fund
Match funding of up to 75% for local sports clubs to develop business cases to improve facilities.
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Better access with parks, cemeteries and open spaces.
Public non-adopted paths and roads
Upgrades to drainage and lighting to enhance the lifespan of paths and roads within  facilities in public parks,
cemeteries and civic spaces.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects are currently being developed to deliver better access in our parks, cemeteries and open spaces. Full budget spend anticipated in
2022/2023.
Page 341

Page 342

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
41
Project Life Financials 50 37 73% 50 (0) 0%
Current Year Financials 13 0 0% 13 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
42
Project Life Financials 220 214 97% 220 0 0%
Current Year Financials 7 0 0% 7 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 03-Apr-21 31-Mar-22
43
Project Life Financials 200 0 0% 200 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
44
Project Life Financials 581 59 10% 581 (0) 0%
Current Year Financials 122 0 0% 122 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Project works complete.  Retentions to be paid in 2022/2023.
Mitigating Action
None required at this time.
Development of play areas to improve accessibility and inclusiveness of play areas throughout West Dunbartonshire.
Mitigating Action
None required at this time.
Anticipated Outcome
Renewal of play parks
East End Park Resurfacing
Resurfacing of 3G pitch at East End Park.
Anticipated Outcome
New all weather tennis courts.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Main Issues / Reason for Variance
Consultant and design team fees for resurfacing of 3G pitch at East End Park.
Mitigating Action
Resurfacing of 3G pitch at East End Park.
Play Parks Grant Funding
Renew and replace play park equipment
None required at this time.
Kilmaronock Cemetery Extension
Extension of existing cemetery at Kilmaronock. 
Main Issues / Reason for Variance
Planned End Date Actual End Date
Sports Facilities Upgrades - Argyll Park - Construction of 3 All Weather Tennis Courts
Project is part of wider investment in sporting facilities and is dependent on match funding from Sports
Scotland. Agreement in principle to wider WDC strategic priorities.
Anticipated Outcome
Planned End Date Forecast End Date
Sustainable burial environment for local residents.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget will be used to develop an area of the existing Cemetery for additional burials.  Project scope has now been developed and will be
tendered under the minor civils framework.  Budget spend anticipated in 2022/2023.
Mitigating Action
None required.
Anticipated Outcome
Page 342

Page 343

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
45
Project Life Financials 210 0 0% 210 0 0%
Current Year Financials 10 0 0% 10 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 30-Nov-23 30-Nov-23
46
Project Life Financials 25 0 0% 25 0 0%
Current Year Financials 25 0 0% 25 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
47
Project Life Financials 228 0 0% 228 0 0%
Current Year Financials 228 0 0% 228 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Nature resource for Faifley Community
Large bins for high traffic areas (pilot)
Supply and install extra large litter bins as a pilot project within hotspot problem areas.
Planned End Date Forecast End Date
Funding received from Nature Restoration Fund to build nature resource for Faifley community. Project due to commence 1st April 2022 and
completion anticipated by November 2022.
Mitigating Action
None required at this time.
Anticipated Outcome
Balloch Mountain Bike Track
Develop a mountain bike skills trail at Balloch Castle Country Park.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Design fees to develop Mountain bike skills trail in Balloch country park. Project to commence April 2023 and works to be complete by November
2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Mountain bike track
Main Issues / Reason for Variance
Supply and install extra large litter bins as a pilot project within hotspot problem areas. Project commences August 2022 and completion is
anticipated by March 2023.
Mitigating Action
None required at this time.
Anticipated Outcome
Nature resource for Faifley Community
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Large bins provided for high traffic areas
Knowes Nature Reserve
Page 343

Page 344

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
48
Project Life Financials 740 350 47% 350 (390) -53%
Current Year Financials 390 0 0% 0 (390) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Jul-22 31-Jul-22
49
Project Life Financials 683 0 0% 566 (117) -17%
Current Year Financials 683 0 0% 566 (117) -17%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
50
Project Life Financials 203 0 0% 107 (96) -47%
Current Year Financials 107 0 0% 107 (0) 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23Forecast End Date
Main Issues / Reason for Variance
Projects and locations still to be decided.
Main Issues / Reason for Variance
To develop projects including Balloch Park Phase 2, and other projects principally around National Cycle Network 7 and further pedestrian
dropped kerbs.
Mitigating Action
None required at this time.
Anticipated Outcome
To improve connectivity and enhanced Cycling routes within West Dunbartonshire.
Spaces for People
Funding has been awarded from Sustrans to assist with social distancing measures required as a result of
the COVID-19 pandemic.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The programme is now complete and there will be no further expenditure.
Mitigating Action
None required at this time.
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Footways/Cycle Path Upgrades
Renewal and/or enhancement of failed footpaths/cycle paths through West Dunbartonshire.
Planned End Date
Cycling, Walking and Safer Streets
Introduction of enhanced walking routes and traffic calming schemes to introduce safer streets within West
Dunbartonshire.
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
To provide people of West Dunbartonshire additional space to help adhere to social distancing guidelines.
Page 344

Page 345

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
51
Project Life Financials 200 0 0% 5 (195) -97%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
52
Project Life Financials 60 55 91% 60 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
53
Project Life Financials 314 215 68% 314 (0) 0%
Current Year Financials 100 0 0% 100 (0) 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Funding has been received from Turnberry Homes and will be used to introduce traffic calming and traffic
management measures to mitigate the impact of additional traffic accessing the housing development off
Castle Road, Dumbarton.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultation completed 2021/2022 and speed humps will be installed prior to 31 March 2023.
Anticipated Outcome
To provide Electric Vehicle Charging points within West Dunbartonshire.
Anticipated Outcome
To improve Footways in West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget to be used for retention payment from last years surfacing of Dumbarton East footways.
Mitigating Action
None required at this time.
Additional Pavement Improvements
Extra funding to accelerate pavement maintenance and improvements across West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Charging points to be installed at Moss O' Balloch park by the end of this financial year.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
Traffic calming to be installed in Dumbarton East.
Electrical Charging Points - Rapid Charge
Funding has been awarded from Transport Scotland for the Installation of electrical charging points
Turnberry Homes - traffic calming/ management at Turnberry housing development off Castle Road
Page 345

Page 346

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
54
Project Life Financials 1,257 0 0% 1,257 0 0%
Current Year Financials 1,257 0 0% 1,257 0 0%
Project Description
Project Manager Raymond Walsh/ Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
55
Project Life Financials 500 0 0% 500 0 0%
Current Year Financials 500 0 0% 500 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
56
Project Life Financials 149 0 0% 149 0 0%
Current Year Financials 149 0 0% 149 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Intention is to complete works within budget.
Infrastructure - Flooding
Essential renewal of failed drainage assets to minimise flood risk within West Dunbartonshire.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Small value projects to tackle flooding events in various areas.
Main Issues / Reason for Variance
A detailed design for Gruggies Burn will be undertaken by the end of the financial year.
Mitigating Action
None required at this time.
Anticipated Outcome
Project should be complete within budget.
Flood Risk Management
Enhancement of drainage infrastructure to ensure compliance with Flood Risk Management Act 2009.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Plans are under consideration by officers.
Mitigating Action
None required at this time.
Anticipated Outcome
Projects should be complete within budget.
Flood Prevention
Various flood prevention projects.
Planned End Date
Page 346

Page 347

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
57
Project Life Financials 800 181 23% 800 0 0%
Current Year Financials 620 0 0% 620 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
58
Project Life Financials 1,627 5 0% 1,075 (552) -34%
Current Year Financials 1,627 5 0% 1,075 (552) -34%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
59
Project Life Financials 3,444 10 0% 3,444 0 0%
Current Year Financials 3,444 10 0% 3,444 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Intention is to complete various surfacing works by the end of March 2023.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Roads Operations are progressing an extensive surfacing program and have a number of schemes to be completed by the end of the financial
year.
Mitigating Action
None required at this time.
Infrastructure - Roads
Infrastructure - Roads.
Main Issues / Reason for Variance
Work will be undertaken during this financial year for A8014 Kilbowie Rd, A814 Congestion Measures, Balloch Station Park & Ride and Bus
Infrastructure Improvements. All of these projects will be undertaken by Roads Services.
Mitigating Action
None required at this time.
Anticipated Outcome
Improve accessibility to Public Transport and improve journey time reliability.
Anticipated Outcome
Project should be completed within budget.
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements & Park and Rides
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Awaiting outcome of Scottish Government & SEPA deliberations, however officers are hopeful full budget spend can be incurred by the end of
the financial year.
Mitigating Action
None required at this time.
River Leven Flood Prevention Scheme
River Leven Flood Prevention Scheme.
Page 347

Page 348

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
60
Project Life Financials 12 8 61% 12 0 0%
Current Year Financials 12 8 61% 12 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
61
Project Life Financials 97 35 36% 97 (0) 0%
Current Year Financials 55 0 0% 55 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
62
Project Life Financials 15,053 421 3% 15,053 (0) 0%
Current Year Financials 1,524 0 0% 1,524 0 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Project should be completed within budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget to be used for a detailed design for Gruggies Burn.
Mitigating Action
None available at this time.
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Gruggies Burn Flood Prevention
Commission of Gruggies Flood Prevention Scheme.
Depot Improvement Works
Improvement of WDC Roads Depot.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This budget will be utilised for depot rationalisation works during the financial year.
Main Issues / Reason for Variance
Budget will be used for any service work carried out by Scottish Power before or after column replacement works.
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Street lighting and associated electrical infrastructure
WDC is responsible for the maintenance of 18,000 street lighting columns and associated illuminated signs
and bollards.  This budget is required for this infrastructure.
Planned End Date Forecast End Date
Page 348

Page 349

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
63
Project Life Financials 2,325 1,007 43% 2,325 0 0%
Current Year Financials 693 0 0% 693 (0) 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
64
Project Life Financials 2,325 0 0% 2,325 0 0%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-26
65
Project Life Financials 4,300 3,829 89% 4,300 (0) 0%
Current Year Financials 498 27 5% 498 (0) 0%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
Project should be completed within budget enhancing the A814 through Clydebank.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works substantially complete. Additional works as a compensation event started on Wallace street in July 2022.
Mitigating Action
None required at this time.
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
Clydebank Charrette, A814
Clydebank Charrette, A814
A813 Road Improvement Phase 2
A813 Road Improvement Phase 2.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
These works are not due to commence until Phase 1 has been completed.
Main Issues / Reason for Variance
Plans have been developed for carriageway widening and footway and cycleway construction between Strathleven and Lions Gate.  There are
ongoing discussions with Aggreko and other land owners in regards to access and land acquisition with construction commencing during
2022/2023.
Mitigating Action
None required at this time.
Anticipated Outcome
To provide an improved A813.
A813 Road Improvement Phase 1
A813 Road Improvement Phase 1.
Planned End Date Forecast End Date
Page 349

Page 350

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
66
Project Life Financials 3,930 3,846 98% 3,846 (84) -2%
Current Year Financials 84 0 0% 0 (84) -100%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-May-21
67
Project Life Financials 1,039 650 63% 1,039 (0) 0%
Current Year Financials 117 6 5% 117 (0) 0%
Project Description
Project Manager Cameron Muir
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
68
Project Life Financials 80 0 0% 80 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
Purchase of Roads plant and equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
New Plant to be purchased
Mitigating Action
None required.
Anticipated Outcome
To purchase equipment.
Main Issues / Reason for Variance
Works to Lomond Bridge were completed May 2021. No further costs expected.
Mitigating Action
None required.
Anticipated Outcome
To provide an improved Lomond Bridge.
Protective overcoating to 4 over bridges River Leven
To overcoat 4 bridges over River Leven.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works to Renton footbridge are now complete and work will commence on the other bridges.
Mitigating Action
None available at this time.
Anticipated Outcome
To upgrade bridges within West Dunbartonshire.
Roads Plant
A811 Lomond Bridge
Upgrade of Lomond Bridge.
Planned End Date Actual End Date
Page 350

Page 351

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
69
Project Life Financials 350 0 0% 350 0 0%
Current Year Financials 350 0 0% 350 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
70
Project Life Financials 300 0 0% 300 0 0%
Current Year Financials 300 0 0% 300 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
71
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 1,000 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
Traffic Signal Upgrades
Upgrade Traffic Signals
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
To upgrade traffic signals.
Roads improvements
Mitigating Action
None required.
Anticipated Outcome
Resurface footways.
Footway Resurfacing (RAMP)
Footway resurfacing
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Various road improvement projects
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
Improvements to roads
Page 351

Page 352

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
72
Project Life Financials 100 0 0% 100 0 0%
Current Year Financials 100 0 0% 100 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
73
Project Life Financials 1,000 0 0% 1,000 0 0%
Current Year Financials 1,000 0 0% 1,000 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
74
Project Life Financials 30 0 0% 30 0 0%
Current Year Financials 30 0 0% 30 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
Street sign renewal
Renewal of street signs
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
Renewal of street signage.
Pavement improvements
Various pavement improvement projects.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects and locations to be decided.
Mitigating Action
None required.
Anticipated Outcome
Improvement to pavements.
Water Safety
To develop Water Safety Policy & enhance water safety equipment in WDC
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Expenditure on water safety equipment will be made as required throughout the year.
Mitigating Action
None required
Anticipated Outcome
Water safety equipment as required.
Page 352

Page 353

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
75
Project Life Financials 400 0 0% 400 0 0%
Current Year Financials 400 0 0% 400 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-23
76
Project Life Financials 1,980 0 0% 1,980 0 0%
Current Year Financials 180 0 0% 45 (135) -75%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
77
Project Life Financials 160 71 44% 160 0 0%
Current Year Financials 80 71 88% 71 (9) -12%
Project Description
Project Manager Kenny Lang
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-23
78
Project Life Financials 1,110 198 18% 1,110 (0) 0%
Current Year Financials 441 9 2% 441 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-29 31-Mar-29Forecast End Date
Main Issues / Reason for Variance
Delivery expected by September 2022 and full budget spend expected before the end of the financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within  budget.
Purchase of gritters
Purchase of gritters.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Consultant project nearing completion and spend will be made thereafter.
Main Issues / Reason for Variance
Although there is slippage caused mainly by the academic year starting several months after the financial year the project is still on track to be
completed by the planned end date.
Mitigating Action
None available at this time.
Anticipated Outcome
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Compactors have now been delivered.
Mitigating Action
None Required.
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within budget.
Replacement of compactors at Dalmoak civic amenity site
The purchase of 2 compactors for the Council civic amenity site at Dalmoak.
Waste Transfer Station
The design, development and construction of a recycling and bulk waste transfer facility that will ensure all
recycling material can be sorted and disposed off appropriately to ensure compliance with landfill ban in
2025.
Purchase of AV Equipment for Education.
Anticipated Outcome
Project delivered within  budget.
AV Equipment - Education
Purchase of AV Equipment for Education.
Planned End Date
Page 353

Page 354

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
79
Project Life Financials 376 335 89% 376 (0) 0%
Current Year Financials 41 0 0% 41 0 0%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
80
Project Life Financials 20,241 15,083 75% 20,241 0 0%
Current Year Financials 1,005 266 26% 1,005 0 0%
Project Description
Project Manager Sharon Jump/ Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renton Campus: The overall construction was completed as programmed (Previously April 2022 but re-programmed due to 13 week COVID-19
site closure).  Phase 1 of the project was handed over on Monday 18 October 2021, with pupils returning to the new school campus on
Wednesday 20 October 2021. There is an acceleration of spend on this project due to part retention being paid 2022/2023. St Mary's Alexandria
Refurbishment Works (condition survey works, MUGA, Dining & Kitchen extension) anticipated commencement of MUGA is September 2022
which means new build kitchen will slip to June 2023.   Additional ASN Provision – Secondary Phase - Temporary accommodation for Choices
will be in place September and plans for rebuild extension ongoing. Additional scoping in respect of vacant space at Choices and former
Riverside ELC is ongoing.
Mitigating Action
None required
Mitigating Action
None required at this time.
Anticipated Outcome
Increase the Chromebook ratio for most disadvantaged children.
Schools Estate Improvement Plan
Improvement of Schools Estate.
Anticipated Outcome
Project delivered within budget and to the revised programme, following COVID-19.
Digital Inclusion
Increase the ratio of chrome book devices for most disadvantaged children and families and support for
families with remote access.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Additional devices have been ordered to increase the ratio of devices to pupils as part of a commitment towards a 1:1 device ratio. The project is
on track to be fully spent in 2022/2023.
Page 354

Page 355

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
81
Project Life Financials 29,450 95 0% 29,450 (0) 0%
Current Year Financials 2,797 0 0% 2,797 0 0%
Project Description
Project Manager Sharon Jump/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-26 31-Mar-26
82
Project Life Financials 750 637 85% 750 0 0%
Current Year Financials 113 0 0% 113 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
83
Project Life Financials 5,508 5,505 100% 5,508 (0) 0%
Current Year Financials 3 0 0% 3 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-22 30-Apr-21
Forecast End Date
Main Issues / Reason for Variance
A new contractor will be appointed in August 2022 and the programme will be reviewed at that time.
Main Issues / Reason for Variance
Project complete and await final charges.
Mitigating Action
None required.
Anticipated Outcome
Mitigating Action
None available at this time.
Planned End Date Forecast End Date
Planned End Date
Project delivered on time and within budget
Anticipated Outcome
Project delivered on budget.
Schools Estate Refurbishment Plan
Completion of condition surveys has been carried out to identify works required to bring various schools from
Condition C to Condition B.
Improvement of Schools Estate.
Planned End Date Forecast End Date
Choices Programme - to assist young people who require additional support
Bringing together Central Support Services which will include relocation of Choices Programme.
Main Issues / Reason for Variance
The next phase of the Schools Estate Improvement Plan involves the development of a new Campus provision in the Faifley area. WDC has
been successful in securing funding from the Scottish Government Learning Estate Improvement Programme. SFT confirmed the indicative
funding allocation for this project at £18.416m on the 4 May 2021, this will be received as a revenue stream over the 25 years of the Scottish
Government financial support (subject to the Council adhering to the funding criteria). Site Options Appraisal has taken place and Members
approved the recommendation to proceed with the new Faifley Campus on the St Joseph's site at Education Committee on 9th June 2021.  The
design team and main contractor have been appointed and the next phase will see the design development for the new Campus taking place.
The statutory consultation process was launched in September 2021 and a report was brought back to the Educational Services committee in
March 2022 concluding the process.
Mitigating Action
None available at this time.
Anticipated Outcome
Delivery of the project will be on time.
Schools Estate Improvement Plan - next Phase - Faifley Campus
Page 355

Page 356

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
84
Project Life Financials 8,748 7,954 91% 8,748 (0) 0%
Current Year Financials 795 1 0% 795 (0) 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-23
85
Project Life Financials 1,150 1,136 99% 1,150 (0) 0%
Current Year Financials 26 12 45% 26 0 0%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Angela Wilson
Project Lifecycle 31-Mar-22 30-Apr-22
86
Project Life Financials 1,053 302 29% 1,053 0 0%
Current Year Financials 1,053 302 29% 969 (84) -8%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
The project will be completed to deliver the requirements of the Early Years expansion plans.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete and final account to be agreed.
Mitigating Action
None required.
Mitigating Action
None required at this time.
Anticipated Outcome
Dalmonach CE Centre
To create new community facilities with additional space for early years provisions.
Early Years Early Learning and Childcare Funding
Early learning and childcare funding awarded to West Dunbartonshire Council to facilitate the expansion in
entitlement to funded ELCC to 1140 hours from August 2020.
Planned End Date
Main Issues / Reason for Variance
Works progressing and budget spend anticipated in 2022/23.
Forecast End Date
Main Issues / Reason for Variance
Provision of aids and adaptations to clients as required.
Mitigating Action
None available at this time
Anticipated Outcome
Provision of adaptations and equipment to HSCP clients as anticipated.
Anticipated Outcome
To create new community facilities with additional space for early years provisions.
Aids & Adaptations - Special Needs Adaptations & Equipment
Reactive budget to provide adaptations and equipment for HSCP clients.
Planned End Date Forecast End Date
Page 356

Page 357

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
87
Project Life Financials 73 50 68% 73 0 0%
Current Year Financials 73 50 68% 73 0 0%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-23 31-Mar-23
88
Project Life Financials 1,422 412 29% 1,422 0 0%
Current Year Financials 1,422 412 29% 950 (472) -33%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
89
Project Life Financials 60 50 83% 60 0 0%
Current Year Financials 17 7 40% 17 0 0%
Project Description
Project Manager Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Oct-22 31-Oct-22Planned End Date Forecast End Date
Main Issues / Reason for Variance
Technical aspect of the project is complete and WDC are assisting with user testing. Delayed but on budget.
Forecast End Date
None available at this time.
Anticipated Outcome
Technical aspect of the project is complete and WDC assisting with user testing. Delayed but on budget.
Internet of Things Asset Tracking
Asset Tracking.
Criminal Justice Adaptations
The construction of an office and storage refit with a mezzanine floor within an existing workshop unit which will include associated finishes
works and electrical installations. The multi-purpose new office space will accommodate two members of staff with an office base and allow
space to set up a training facility indoors. Project expected to be completed by 31 March 2023.
Mitigating Action
Anticipated Outcome
Most of capital allocated to HSCP will be used to review/replace the current case management systems and will be rephased in line with the
project plan. Supply chain delays may continue to impact delivery and spend.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
All PC replacements for high schools have been replaced during the summer break. Orders for replacement Chrome books have been raised.
Supplier lead times for laptops and Chrome books have improved but exceed pre-Covid delivery times.
Mitigating Action
Continue to escalate and meet framework suppliers to confirm delivery lead times.
Investigate other procurement routes as well as adjust the project scope to replace where stock allows.
ICT Modernisation
This budget is to facilitate ICT infrastructure and modernise working practices.
Mitigating Action
Renovation of Unit 11 Levenside Business Court.
Planned End Date
None available at this time
Anticipated Outcome
Renovation of Unit 11 Levenside Business Court
Main Issues / Reason for Variance
Page 357

Page 358

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
90
Project Life Financials 1,297 237 18% 1,297 0 0%
Current Year Financials 1,297 237 18% 1,100 (197) -15%
Project Description
Project Manager Brian Miller/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-23 31-Mar-23
91
Project Life Financials 450 189 42% 450 0 0%
Current Year Financials 173 11 7% 150 (23) -13%
Project Description
Project Manager Dorota Piotrowicz/ Patricia Kerr
Chief Officer Victoria Rogers
Project Lifecycle 30-Sep-23 30-Sep-23
92
Project Life Financials 3,502 42 1% 3,502 0 0%
Current Year Financials 3,502 42 1% 3,502 0 0%
Project Description
Project Manager N/A
Chief Officer N/A
Project Lifecycle 31-Mar-23 31-Mar-23
Project Life Financials 1,000 0 0% 1,000 0 0%
Cost of Living
Main Issues / Reason for Variance
Project spend relates to internal and external resources to implement new systems, processes and user training skills.  Mailbox migration aspect
of the project delayed until cloud backup is implemented (procurement of backup has started and target implementation is September/October
2022).  Implementation of device management functionality in 365 is on target to go live in September 2022. Information governance work stream
baseline review is complete and action plan is drafted for review.  Recruitment of a resource to train end users has started.
Mitigating Action
Continue to monitor the various work streams to accelerate aspects of the project where possible if suppliers can provide resource. Continue to
assess where a) internal skills have developed, b) external resource is needed for introducing new functionality in the future to inform future
bidding cycles and c) temporary recruitment/secondment is required.
Anticipated Outcome
Anticipated Outcome
Anticipate the majority of budget being spent this financial year but some works are planned for the last quarter of the year for Public Sector
Network (PSN) annual compliance submission.
365 Implementation
ICT Security & DR
The project is for the enhancement of security systems, server replacement and the update of corporate
applications to ensure compliance with 15/16 PSN requirements, to enhance the disaster recovery
capabilities of WDC.
Majority of budget spent but delayed.
None required.
Anticipated Outcome
Direct project support costs allocated as appropriate.
Direct Project Support
Business support cost such as reallocation of architects and project support at year end.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
n/a
Mitigating Action
Project services to delivery Microsoft 365 Implementation including 3rd party supplier, training, technical
consultancy etc.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Storage Area Network (SAN) delivered and installation planning underway.  Switch replacement in schools completed during the summer break. 
Server replacement at scoping stage.
Mitigating Action
Monitor supply chain issues. Continue tendering processes and implementation stages for each project.
Page 358

Page 359

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF PROJECTS AT GREEN ALERT STATUS
PERIOD END DATE
PERIOD 4
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Current Year Financials 1,000 0 0% 1,000 0 0%
Project Description
Project Manager N/A
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-23
To support Council and community organisations with capital costs for cost of living initiatives
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Working Group currently developing proposals for initiative
Mitigating Action
None required.
Anticipated Outcome
Initialive will assist with cost of living crisis
Page 359

Page 360

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (141) (99) 70% (419) (278) 197%
Current Year Financials (278) 0 0% (278) 0 0%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
2
Project Life Financials (75,127) (30,877) 41% (76,371) (1,244) 2%
Current Year Financials (5,574) (2,020) 36% (5,574) 0 0%
Project Description
Project Lifecycle 31-Mar-30 31-Mar-30
3
Project Life Financials (35,184) (4,705) 13% (35,184) 0 0%
Current Year Financials (959) (126) 13% (959) 0 0%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
4
Project Life Financials (10,432) (4,584) 44% (10,432) 0 0%
Current Year Financials (1,753) (845) 48% (1,753) 0 0%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
Match funding received.
None required.
Mitigating Action
Mitigating actions are detailed within the appropriate status updates.
Anticipated Outcome
Application of resources as appropriate.
Match Funding / Other Grants and Contributions
Match Funding / Other Grants and Contributions
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application of resources is dependent on capital project progressing in year as planned.
Mitigating Action
Application of resources is dependent on capital project progressing in year as planned.
Main Issues / Reason for Variance
General services capital grant is anticipated to be received as forecast.
Mitigating Action
None required at this time
Anticipated Outcome
General services capital grant is anticipated to be received as forecast.
Ring Fenced Government Grant Funding
This is ring fenced grant funding which is primarily anticipated to be received from the Scottish Government and
relates to Cycling, Walking, Safer Streets, Regeneration Placed Based Investment Programme, Early Years,
Gruggies Burn Flood works, Early Years funding, City Deal and Town Centre Fund.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Application of resources held on balance sheet as at 31 March 2022 as appropriate.
General Services Capital Grant
This is a general grant received from the Scottish Government in relation to General Services capital spend
Application of resources is dependent on capital project progressing in year as planned.
Spend to Date Forecast Variance
Resources Carried Forward
These are resources that have been received in previous years relating to Turnberry Homes, Town Centre Fund
Grant, Digital Inclusion, Clydebank Can on the Canal, Internet of Things Asset Tracking and Auld Street Bond.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
31 July 2022
Budget Details
Project Life Financials
Page 360

Page 361

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
Spend to Date Forecast Variance
Resources Carried Forward
31 July 2022
Budget Details
Project Life Financials
5
Project Life Financials (25,429) (77) 0% (26,506) (1,077) 4%
Current Year Financials 0 0 #DIV/0! 0 0 #DIV/0!
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
6
Project Life Financials (125,200) (51,621) 41% (120,378) 4,822 -4%
Current Year Financials (57,013) 43 0% (42,873) 14,140 -25%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
7
Project Life Financials (10) 0 0% (10) 0 0%
Current Year Financials (10) 0 0% (10) 0 0%
Project Description
Project Lifecycle 31-Mar-22 31-Mar-22
Anticipated Outcome
CFCR applied to relevant capital project.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Renovation of Unit 11 Levenside Business Court
Mitigating Action
None required at this time.
This is capital spend which is funded by revenue budgets
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved for the purposes of
funding capital expenditure
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery therefore mitigating action is detailed in the red and amber analysis.
Mitigating Action
None available at this time.
Anticipated Outcome
While prudential borrowing requirement is likely to be less than budgeted in the current financial year this is anticipated to catch up over the
programme life.
CFCR
Capital receipts received.
Capital Receipts
These are capital receipts that are anticipated from sales of land and buildings both as part of the normal disposal
programme and also as part of the business case investment in office rationalisation, new school building and
new care home development
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Receipts budgets are based on assumptions in relation to the sale of various sites. Not all sales will be realised this financial year. The main
ones being OLSP, St James retail park, Dalreoch Care Home. Queen's Quay, Levenbank Terrace, Heather Avenue, Crosslet House. As agreed
at Council receipts received are used firstly to pay for principle and premiums.
Mitigating Action
While market conditions are out with officers control all potential receipts will be explored.
Anticipated Outcome
Page 361

Page 362

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME APPENDIX 9
BUDGET VIREMENT
PERIOD END DATE
4
PERIOD
Project Name
Original
Budget    
£000    
Virement
Requested    
£000
Total Project
Budget   
£000
Committee Reason for Virement
Community Sports Fund 66 (66) 0 IRED Fund now closed and budget being
moved to Posties Park Sports Hub.
Posties Park Sports Hub  844 66 910 IRED New sports hub to include gym &
running track.
31 July 2022
Page 362

Page 363

WEST DUNBARTONSHIRE COUNCIL
GENERAL SERVICES CAPITAL PROGRAMME APPENDIX 10
BUDGET ACCELERATION
PERIOD END DATE
PERIOD 4
Project Name
Original
Budget
£000
Acceleration
from 2023/24
£000
Revised
Budget
£000
Spend to
Date
£000
Forecast
22/23
£000
Main Issues
Schools Estate
Improvement Plan 2,020 241 2,261          265 2,261    
A request for budget acceleration from
2023/24 has been made for Renton
Primary School due to a part retention
payment which is due this financial year.
31 July 2022
Page 363

Page 364

Page 364

Page 365

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Council : 31th August 2022
___________________________________________________________________
Subject: Housing Revenue Account Budgetary Control Report
to 31 July 2022 (Period 4)
1. Purpose
1.1 The purpose of the report is to provide members with an update on the
financial performance to 31 July 2022 (Period 4) of the HRA revenue and
capital budgets for 2022/23.
2. Recommendations
2.1 Members are asked to:
i) note the revenue analysis shows a projected annual favourable variance
of £0.008m; and
ii) note the net projected annual position in relation to the capital plan is
highlighting an in-year adverse variance of £0.319m ( 0.43%) as detailed
in Appendix 4.
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council on 9 March 2022, Members
agreed the revenue estimates for 2022/23 and a total budget of £47.018m.
Capital
3.2 At the meeting of Council on 9 March 2022, Members also agreed the
updated Capital Plan for 2022/23 which has been augmented by slippage
from 2021/22 to produce a total planned spend for 2021/22 of £65.567m.
4. Main Issues
Revenue
4.1  The budgetary position for HRA Revenue is provided in Appendix 1 with
information on projected variances valued at more than £0.050m being
provided as Appendix 2, and shows a projected favourable variance of
£0.008m.
Item 15
Page 365

Page 366

Capital 
4.2 The HRA capital summary position is shown in Appendix 3.  Information on
projects that are highlighted as being within the Amber category is provided in
Appendix 4 and Appendix 5 provides information on the projects at Green.  A
summary of anticipated resources is shown in Appendix 6. The analysis
shows that there is currently a projected in-year adverse variance of £0.319m.
4.3 From the analysis within the appendices it can be seen that there are no
projects reporting slippage at this stage.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to unforeseen
cost being identified between now and the end of the financial year.  This can
affect all service areas.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report.
9. Consultation
9.1 The views of both Housing management and Legal services have been
requested on this report and both have advised there are neither any issues
nor concerns with the proposal.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Page 366

Page 367

Laurence Slavin
Chief Officer – Resources
Date: 15 August 2022
___________________________________________________________________
Person to Contact: Janice Rainey - Business Unit Finance Partner (HEED),
16 Church Street, Dumbarton, G82 1QL,     
telephone: 01389 737704, e-mail janice.rainey@west-
dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue) 
Appendix 3 - Budgetary Position (Capital)
Appendix 4 - Variance analysis Amber Projects (Capital)
Appendix 5 - Variance analysis Green Projects (Capital)
Appendix 6 - Resources (Capital)
Appendix 7 - Analysis of Affordable Housing Supply 
Programme (Capital)
Background Papers: None
Wards Affected: All
Page 367

Page 368

Page 368

Page 369

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2022/23
PERIOD END DATE
Subjective Summary
Total Budget
2022/23 
£000
Spend to
Date
2022/23 
£000
Forecast
Spend
£000
Annual RAG
Status
Employee Costs 6,690 1,936 6,832 142 2% 
Property Costs 2,030 504 2,000 (30) -1% 
Transport Costs 112 42 133 21 0% 
Supplies, Services And Admin 395 72 382 (13) -3% 
Support Services 2,724 845 2,536 (188) -7% 
Other Expenditure 532 346 580 48 9% 
Repairs & Maintenance 12,942 820 12,432 (510) -4% 
Bad Debt Provision 1,060 302 923 (137) -13% 
Void Loss (Council Tax/Lost Rents) 857 630 1,549 692 81% 
Loan Charges 19,676 6,559 19,676 0 0% 
Total Expenditure 47,018 12,056 47,043 25 0% 
House Rents 45,215 12,756 45,215 0 0% 
Lockup Rents 210 57 207 3 1% 
Factoring/Insurance Charges 1,316 436 1,307 9 1% 
Other rents 115 27 116 (1) -1% 
Interest on Revenue Balance 55 3 10 45 82% 
Income from Reserves 0 0 60 (60) 0% 
Miscellaneous income 107 41 136 (29) -27% 
Total Income 47,018 13,320 47,051 (33) 0% 
Net Expenditure 0 (1,264) (8) (8) 
Forecast Variance 2022/23
£000               %
31 July 2022
Page 369

Page 370

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 July 2022
PERIOD 4
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
EMPLOYEE COSTS 6,690 6,832 142 2% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
SUPPORT SERVICES 2,724 2,536 (188) -7% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
The need for additional staffing is regularly reviewed and will be reduced when service
requirements allow.
This budget covers all employees charged directly to the HRA including caretakers.
Variance Narrative
£60K of this adverse variance relates to the increased pay awarded to caretakers  following
job evaluation panel on 7 April.  This is offset by a transfer from HRA service improvement
reserve which is shown in the income section . The remaining variance is due to additional
temp posts being added to assist with backlogs/ staff absences. 
A favourable variance is expected with the assumption that the 2022/23 forecast outturn for
support services is expected  to be in line with the 2021/22 outturn adjusted for pay uplifts
etc. This charge is calculated each year end based on HRA's percentage usage of the total
cost of WDC support services. The 2022/23 HRA budget was set before this 2021/22
outturn was known so was based on 2020/21 charge which was higher.
Budget Details Variance Analysis
Subjective Analysis forecast Variance
A year end overspend is anticipated
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Subjective Description
This budget covers central support recharges to the HRA
Variance Narrative
Subjective Description
A year end underspend is anticipated
Page 370

Page 371

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 July 2022
PERIOD 4
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
REPAIRS & MAINTENANCE 12,942 12,432 (510) -4% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
BAD DEBT PROVISION 1,060 923 (137) -13% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Service Description
Budget Details Variance Analysis
Subjective Analysis forecast Variance
The favourable variance within Repairs & Maintenance is due to a couple of factors.  The
first being other maintenance relating to Gas Maintenance, Lift Maintenance etc. is expected
to be lower than anticipated at time of budget setting when comparing to previous years
trends.  The second factor, similarly when looking at previous years trends we can expect
the recoveries from owners to be higher than anticipated at time of budget setting.  These
combined results in the projected favourable variance in 2022/23.
Variance Narrative
This budget covers all repair and maintenance expenditure to houses and lockups
A year end underspend is anticipated
A year end underspend is anticipated
Variance Narrative
The Bad Debt Provision expected to be required for 2022/23 is less than estimated at time
of budget setting, resulting in a favourable variance. This assumes that the provision
required in 22/23  will be similar to the 21/22 provision.
Budget Details Variance Analysis
Subjective Analysis forecast Variance
Service Description
This budget allows for the provision for bad and doubtful debts to be maintained at an appropriate level
Page 371

Page 372

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2022/23
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 July 2022
PERIOD 4
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
VOID LOSS 857 1,549 692 81% 
Main Issues
Mitigating Action
Anticipated Outcome
A void working group has been reviewing the issues and have been implementing actions
and working with Housing Maintenance managers to improve the situation and it is expected
that the void figures will start to decrease significantly over the next few month
Subjective Analysis forecast Variance
Service Description
This budget covers the rents lost on void houses and lockups and the cost of council tax on void properties.
A year end overspend is anticipated
Variance Narrative
The main reason for the projected adverse variance relates to the number of void properties
being higher than expected at time of budget setting. The budget was set on the assumption
that backlogs following COVID delays  in getting voids turned around would be resolved
early in year however the  numbers continue to be high .
Budget Details Variance Analysis
Page 372

Page 373

APPENDIX 3
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 4
Spend to
Date Spend to Date
£000 £000
Red
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Amber
2 7.7% 1,679 31.9% 2 7.7% 1,668 31.7%
Green
24 92.3% 3,577 68.1% 24 92.3% 3,587 68.3%
26 100% 5,256 100% 26 100% 5,256 100%
Budget Spend to
Date
Forecast
Spend Forecast Variance Budget Spend to Date Forecast
Spend
Forecast
Variance Slippage Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
0 0 0 0 0 0 0 0 0 0
115,267 1,679 115,767 500 41,645 1,668 42,145 500 0 500
100,816 3,577 100,636 (181) 23,922 3,587 23,742 (181) 0 (181)
216,084 5,256 216,403 319 65,567 5,256 65,887 319 0 319
216,084 5,256 216,403 (319) 65,567 5,256 65,887 (319)
0 0 0 0 0 0 0 0
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Projects are either at risk of being overspent and/or delay in
completion (although this is unquantifiable at present) or the project
has any issues that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the
forecast stages in the project life cycle and no issues are anticipated
at this time
TOTAL EXPENDITURE
The in-year adverse variance reflects the 20/21 Scottish Government grant in relation to future developments which cannot be drawndown prior to spend (£0.850m). This is offset by £0.511m additional Scottish Government Grant income which is generated off of the Buy Back Scheme and can be used to support the Affordable Housing Supply Programme. Overall, there is a favourable project life variance of £0.702m which relates to an additional £1.308m grant income as successfully negotiated by Officers in relation to the increased grant per unit at Aitkenbar and Haldane and the additional grant generated from the buyback scheme within the current year and previous financial years. However, this is offset by an under recovery in grant of £0.606m which reflects changes to the actual number of units compared to budget at individual sites and the change in funding composition at St Andrews whereby the grant was originally budgeted higher based on a partnership with another registered social landlord. However, disc
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the
forecast stages in the project life cycle and no issues are anticipated
at this time
31 July 2022
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at RAG
Status
Red
Projects are forecast to be overspent and/or experience material
delay to completion
Amber
Projects are either at risk of being overspent and/or delay in
completion (although this is unquantifiable at present) or the project
has any issues that require to be reported at this time
Green
Page 373

Page 374

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF AMBER PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 8,384 660 8% 8,884 500 6%
Current Year Financials 2,000 660 33% 2,500 500 25%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 106,883 1,019 1% 106,883 0 0%
Current Year Financials 39,645 1,008 3% 39,645 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL OF AMBER
PROJECTS
Project Life Financials 115,267 1,679 1% 115,767 500 0%
Current Year Financials 41,645 1,668 4% 42,145 500 1%
31 July 2022
Budget Details
Project Life Financials
Spend to Date Variance
Void house strategy programme
Spend on Void Properties to bring them up to letting standard 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Void works to continue into 22/23 to bring void properties up to a lettable standard.  The high number of voids has led to a
higher than expected demand for this budget, resulting in a projected overspend in 22/23. 
Mitigating Action
None available at this time
Anticipated Outcome
Void properties to be brought up to lettable standard
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Progress will continue to be monitored as the year progresses.  The project has been moved into amber due to issues around
the Clydebank East site. Following additional and more detailed site investigations it now appears likely that there will be
significant additional costs to deliver the ground remediation strategy.  These additional costs place the development at risk due
to affordability issues.  It is expected full information to make an assessment will be available in early September and  an update
will be given to the Housing and Communities Committee when this has been achieved . Site specific updates as follows:-
Clydebank East - 88 units to be completed on the site.  Estimated Start Date October 2022 and estimated completion October
2024.  Full planning received and Officers are working through the planning conditions site with start date anticipated October
2022, subject to costs which will be received August 2022.
Queens Quay Site B - 29 units to completed on the site with site completion expected August 2022.  Rental income forecast
from end of September 2022.
Affordable Supply Programme
Affordable Housing Supply Programme
Bonhill Gap Site - 32 units to be completed on site.  Estimated start date April 2023 and estimated completion October 2024.
The project is currently at design stage.
Mitigating Action
None required at this time
Anticipated Outcome
Project to complete and meet revised spend targets
Queens Quay Site C - 20 units to be completed on site.  Estimated start date March 2023 and estimated completion March
2024.
Pappert - 27 units to be completed on site.  Estimated completion early  2023.  Officers currently working on the design and
build contract.
Bank Street - 20 units to be completed on the site.  Estimated start date July 2023, estimated completion July 2024.  Project is
currently at feasibility stage.
Clydebank Health Centre - Units on site to be confirmed.  Acquisition to be agreed with NHS on agreement of purchase cost.
Willox Park Phase1 - 17 units to be completed on site.  Estimated start date March 2023 and estimated completion March.
17/18 units demolition complete, and site investigation under way.  Officers ready to submit to for full planning.
Mount Pleasant - 25 units to be completed on site.  Estimated start date March 2023 with estimated completion March 2024.
Demolition of current site to go to the August 2022 tendering committee.
Page 374

Page 375

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,487 0 0% 2,487 0 0%
Current Year Financials 474 0 0% 474 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
2
Project Life Financials 2,266 0 0% 2,266 0 0%
Current Year Financials 431 0 0% 431 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
3
Project Life Financials 1,557 0 0% 1,557 0 0%
Current Year Financials 664 0 0% 664 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
4
Project Life Financials 271 0 0% 271 0 0%
Current Year Financials 185 0 0% 185 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No issues. Development of QL system to carry on through 22/23.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
QL Development
This budget relates to the costs associated with the development of the Integrated Housing
Management System
Better Homes Priority Budget
Priority projects as prioritised by the Better Homes Group 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
A number of priority initiatives, supported by the Better Homes Project Board,  are being investigated and are envisaged to have
a positive impact on the current council housing stock and budget, with works expected to progress in 22/23.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
None required
Anticipated Outcome
Full budget spend
Capitalised minor works
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date 
Adaptations to Housing for Special Needs 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
Special needs adaptations
Page 375

Page 376

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 170 0 0% 170 0 0%
Current Year Financials 40 0 0% 40 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
6
Project Life Financials 17 0 0% 17 0 0%
Current Year Financials 17 0 0% 17 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
7
Project Life Financials 192 0 0% 192 0 0%
Current Year Financials 192 0 0% 192 0 0%
Project Description
Project Lifecycle 31-Mar-23 31-Mar-23
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Awaiting receipt of the airport scheme outline from Glasgow Airport before works can planned.  Project expected to make
progression in 22/23.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Airport Noise
Noise Insulation Project
Community Safety Projects
Community Safety Projects 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Gypsy Travellers Site
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date
Page 376

Page 377

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
8
Project Life Financials 19,841 0 0% 19,841 0 0%
Current Year Financials 4,455 0 0% 4,455 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
9
Project Life Financials 17,607 1,654 9% 17,607 0 0%
Current Year Financials 4,955 1,654 33% 4,955 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
10
Project Life Financials 10,963 109 1% 10,963 0 0%
Current Year Financials 2,500 109 4% 2,500 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
11
Project Life Financials 257 0 0% 257 0 0%
Current Year Financials 75 0 0% 75 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Full budget spend
External stores/garages/bin stores/drainage component renewals
This budget is to focus on external stores/garages/bin stores etc. component renewals as
identified and recommended from the housing stock condition survey. 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Project is anticipated to meet revised targets.  Additional external support will be available from August to assist with window
installs.
Mitigating Action
None required at this time
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Doors/window component renewals
Doors/Windows Component Renewals
Roof Coverings
Building external component renewals, roofs/chimneys/flashings/fascias/gutters/svp 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Currently behind monthly targets, however tentatively anticipated to meet full spend and targets. Current tiled roof progress is
behind cumulative monthly targets but overall output is anticipated to increase with the new metal and flat roof framework
contract coming on board contributing to a wider range of roof types being completed.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets. Current progress is slightly behind cumulative monthly targets, work is
progressing and additional resources will be coming on board shortly with new framework contractor.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Targeted SHQS /EESSH compliance works
This budget is to focus on work required to maintain the SHQS compliance and energy
efficiency  with WDC housing stock. 
Planned End Date  Forecast End Date
Page 377

Page 378

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
12
Project Life Financials 273 35 13% 273 0 0%
Current Year Financials 91 35 39% 91 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
13
Project Life Financials 566 65 11% 566 0 0%
Current Year Financials 108 65 60% 108 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
14
Project Life Financials 5,092 295 6% 5,092 0 0%
Current Year Financials 969 295 30% 969 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
Anticipated to meet full spend and targets and possibly overspend. This budget has overspent in recent years as demand has
exceeded expectations. Current progress continues this trend however an industry wide shortage in microchips is likely to hinder
availability of boilers and in turn will impact on spend. Due to the nature of this project (ensuring heating and hot water
availability) there is no option for a conscious reduction of installs.
Mitigating Action
None available
Anticipated Outcome
Full budget spend, possible overspend.
Anticipated Outcome
Full budget spend
Heating improvement works
Carry out works to renew inefficient boilers/full systems as identified from the stock condition
survey and renewal of obsolete/damaged boilers. 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Mitigating Action
Officers continue to liaise with owners to encourage agreement for install.
Anticipated Outcome
Anticipated not to meet full spend despite best efforts.
Statutory/regulatory compliance works (lifts/electrical/legionnella/fire etc)
This budget will be used to upgrade / replace components / installations in order to comply with
the relevant standards / legislation / health and safety in relation to housing stock.
Secure entry component renewals
This budget is to focus on secure door entry component renewals as identified and
recommended from the housing stock condition survey and appropriate council officer referrals. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
This programme always presents challenges with owner liaison and reaching agreements to install door entry where none exists,
this contributes directly to achieving SHQS compliance for this element and reducing abeyances. The budget reflects the demand
and number of installs required but it is acknowledged that full uptake is unlikely.
Page 378

Page 379

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
15
Project Life Financials 280 0 0% 280 0 0%
Current Year Financials 54 0 0% 54 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
16
Project Life Financials 5,293 73 1% 5,293 0 0%
Current Year Financials 1,036 73 7% 1,036 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
17
Project Life Financials 103 0 0% 103 0 0%
Current Year Financials 103 0 0% 103 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Full budget spend
Improvement works (Risk St)
Risk Street Over clad 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Modern facilities and services
New Kitchens, Bathrooms and Showers
Energy improvements/energy efficiency works
Energy improvements/ efficiency works (e.g. loft insulation, pipe/tank insulation, draught
exclusion) 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Page 379

Page 380

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
18
Project Life Financials 581 0 0% 400 (181) -31%
Current Year Financials 181 0 0% 0 (181) -100%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
19
Project Life Financials 3,637 35 1% 3,637 0 0%
Current Year Financials 887 35 4% 887 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
20
Project Life Financials 5,092 295 6% 5,092 0 0%
Current Year Financials 969 295 30% 969 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
21
Project Life Financials 1,135 9 1% 1,135 0 0%
Current Year Financials 215 9 4% 215 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Asbestos management works
This budget is to fund work associated with the management of current asbestos legislation and
Environmental renewal works, paths/fences/walls/parking area's
Environmental renewal works, paths/fences/walls/parking areas 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Main Issues / Reason for Variance
No Issues, anticipated to meet full spend and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Spend as required
Defective structures/component renewals
Defective structures 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
No Issues, contingent budget for unplanned spend
Mitigating Action
none at this time
Contingencies
This is a contingent budget for unforeseen matters which may arise during the year.
Page 380

Page 381

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
22
Project Life Financials 2,378 0 0% 2,378 0 0%
Current Year Financials 800 0 0% 800 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
23
Project Life Financials 7,729 172 2% 7,729 0 0%
Current Year Financials 2,019 172 9% 2,019 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Mitigating Action
None required.
Anticipated Outcome
Budget spend anticipated, should criteria be met.
Buy Backs
This is a budget to undertake specific projects that will deliver housing policies/strategies,
example: Ex local authority and mortgage to rent buy-back scheme 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
The main objective of the Buy Back Scheme is to bring former council properties that were sold through the RTB scheme, back
into council use.  These properties must assist the council with reducing housing need on the waiting list and where appropriate
assist with external capital works.  For these reasons, any purchase is subject to stringent criteria to ensure accountability and
value for money for existing tenants.  Spend in 22/23 will therefore be dependent on these factors.  So far this year , 2 homes
have been purchased, with 3 under offer and  the targeted is to deliver an additional 20 homes each year through the buyback
scheme
Main Issues / Reason for Variance
No Issues, anticipated to meet spend and revised targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Multi Story Flats  ( including Fire Risk Assessment Works)
High Rise Fire Safety Measures 
Planned End Date  Forecast End Date
Page 381

Page 382

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
24
Project Life Financials 13,031 835 6% 13,031 0 0%
Current Year Financials 2,504 835 33% 2,504 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL OF GREEN
PROJECTS
Project Life Financials 100,816 3,577 4% 100,636 (181) 0%
Current Year Financials 23,922 3,587 15% 23,742 (181) -1%
Main Issues / Reason for Variance
No Issues, budget for salaries and support
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Salaries/central support/offices
Allocation of costs from other WDC services who support the HRA capital programme 
Planned End Date  Forecast End Date
Page 382

Page 383

APPENDIX 6
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 4
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (48,826) 0 0% (48,826) 0 0%
Current Year Financials (30,006) 0 0% (30,006) 0 0%
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
TOTAL RESOURCES
Project Life Financials 48,826 0 0% 48,826 0 0%
Current Year Financials 30,006 0 0% 30,006 0 0%
Main Issues / Reason for Variance
31 July 2022
Budget Details Project Life Financials
Spend to Date Variance
NEW BUILD GRANT
Grant to facilitate the building of new build housing 
Planned End Date  Forecast End Date
No issues, income due to be received with no problems anticipated
Mitigating Action
None required
Anticipated Outcome
Income due to be received
Page 383

Page 384

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
HRA CAPITAL PROGRAMME
ANALYSIS OF AFFORDABLE HOUSING SUPPLY PROGRAMME
MONTH END DATE
PERIOD 4
Budget Spend to Date Forecast Spend
£000 £000 £000 £000 %
RAG
Status
St Andrews School 636 34 636 - 0% 
Haldane Primary School 148 0 148 - 0% 
Aitkenbar Primary School 652 - 652 - 0% 
Clydebank East 26,474 - 26,474 - 0% 
Creveul Court 58 59 58 - 0% 
Queens Quay Site B 1,259 858 1,259 - 0% 
Queens Quay Site C 6,198 1 6,198 - 0% 
Pappert 7,332 2 7,332 - 0% 
Lilac Avenue 2,676 - 2,676 - 0% 
Bank Street 4,674 - 4,674 - 0% 
Clydebank Health Centre 6,930 3 6,930 - 0% 
Willox Park Phase1 3,817 34 3,817 - 0% 
Willox Park Phase2 6,300 - 6,300 - 0% 
Mount Pleasant 4,200 11 4,200 - 0% 
Silverton 2,100 - 2,100 - 0% 
Fees, Staffing Costs, contingency 4,005 14 4,005 - 0% 
Gap sites 12,600 - 12,600 - 0% 
Bonhill Gap Site - 2 - - 0% 
Future New build sites 16,824 - 16,824 - 0% 
Total Expenditure 106,883 1,019 106,883 0 
31 July 2022
Site
Project Life Financials
Variance
Page 384