WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
Council: 19 June 2024
Subject: Financial Update
1. PURPOSE
1.1 To provide an update on the financial challenges facing the Council and the
estimated 2025/26 – 2029/30 revenue budget gaps.
1.2 This is the first financial update of 2024/25 since the 2024/25 budget was set
on 6 March 2024 and rolls forward previous estimates as well as updating
some assumptions. The assumptions will continue to be updated and refined
as the financial year progresses.
1.3 This update has been prepared using three different scenarios, best case,
worst case and mid-range. Relatively small variations in assumptions can lead
to fairly significant changes in the outcome. Throughout the report the primary
focus is on the mid-range, however, where appropriate reference is made to
best case and worst case assumptions.
2. RECOMMENDATIONS
2.1 Members are asked to:
a) Note the updated position regarding projections for the Council’s
estimated revenue budget gaps in 2025/26-2029/30, in particular the
updated mid-range 2025/26 budget gap of £9.235m as summarised at
paragraph 4.11.
b) Agree the 3 year strategy to replenish the Council’s reserves using the
additional £1.129m of recurring Revenue Support Grant funding, the
increased benefit associated with the reduction in the employers
Strathclyde Pension Fund contribution rate and the release of £0.860m
of earmarked funding to the general fund.
c) Note the preliminary discussions between the S95 Officers of
Inverclyde Council, Renfrewshire Council and West Dunbartonshire
Council in relation to a potential future delivery model for Internal Audit
and Fraud Services and agree these discussions should be further
progressed with a report being brought back to Council with options at
an appropriate time.
3. BACKGROUND
3.1 On 6 March 2024, the Council agreed a balanced 2024/25 revenue budget, a
revised capital budget and revenue estimates for 2025/26-2028/29.  That
ITEM 9

Page 2

budget report also highlighted estimated future year budget gaps based on a
range of assumptions including future Scottish Government funding, inflation
and future interest rates. The consequences of the decisions taken by Council
on 6 March to agree a balanced 2024/25 budget reduced the cumulative
estimated future budget gap in the best case, mid-range and worst case
scenarios as set out in Exhibit 1.
Exhibit 1 – Future Year Estimated Cumulative Budget Gaps
6 March 2024 Budget Post Budget Setting
Budget Gap 25/26
£000
26/27
£000
27/28
£000
28/29
£000
25/26
£000
26/27
£000
27/28
£000
28/29
£000
Best Case 9,691 15,136 20,617 31,854 4,398 9,793 15,274 26,511
Mid-Range 15,053 23,260 31,596 45,783 9,760 17,917 26,253 40,440
Worst Case 24,409 37,447 50,726 69,975 19,116 32,104 45,383 64,632
3.2 Appendix 1 provides further detail on how the mid-range estimated budget
gap was affected by the decisions made when setting the 2024/25 budget on
6 March 2024. 
4. MAIN ISSUES
4.1 Since the budget was agreed on 6 March 2024 I have revisited the key
assumptions and cost pressures detailed in the Council
Budget Paper. This is summarised in the paragraphs below.
4.2 Scottish Government Finance Settlement
In my report on 6 March 2024, I advised that my assumptions in relation to
future year Scottish Government funding were :
• Best Case - Flat Cash
• Mid-Range – Flat Cash
• Worst Case - 1.0% reduction.
After the 2024/25 budget was set additional consequentials of £62.7m (our
share being £1.129m) was made available by the Scottish Government to
support the freezing of Council Tax. This brought the Council’s overall
2024/25 funding reduction to around a 0.5% reduction. As such it may be
prudent to assume a 0.5% reduction in future years within the mid-range
scenario. The Scottish Government was due to publish its medium term
financial strategy in May 2024 however this has been delayed until June 2024
due to the change in Scotland’s First Minister. Once published this may
provide more insight as to future year estimates. Consequently I have not
changed my flat cash mid-range assumption at the current time however there
may be a need to revisit this prior to the next Financial Update report to
Council on 30 October 2024.  By means of illustration a 0.5% reduction in
funding would increase the budget gap by circa £1.2m. 
4.3 Changes to Base Budget
There have been two changes to the Council’s base budget since the 6 March

Page 3

2024 Budget report to Council. These are set out below.
4.4 Base Budget Adjustment 1 – Adult Social Care Pay Uplift in Commissioned
Services
The Scottish Government is providing £230m to fund the pay uplift to a
minimum rate of £12 per hour for workers providing direct adult social care in
the third and independent sectors. Our share of the £230m is £3.916m. This
funding is passed through to the Health & Social Care Partnership (HSCP).
The base budget adjustment is required to reflect the need to increase the
HSCP requisition by this amount however as the income is also received there
is no impact on the budget gap. 
4.5 Base Budget Adjustment 2 – Criminal Justice Funding
In previous years, the Council acknowledged receipt of criminal justice funding
from the Scottish Government, offset by a criminal justice requisition payment
passed through to the HSCP.  Since the funding is paid direct to HSCP, a
base budget adjustment is required to remove both this cost and income from
the General Services budget, this has no impact on the budget gap.  
4.6 Changes to Non-Pay Inflation
Inflation is included in future year budget estimates where it is considered
necessary to ensure budgets are adjusted to reflect expected increases in
costs. 
In prior years there has been an annual adjustment to the budget to reflect
income due from services outwith General Services (e.g. HRA, Capital etc) for
corporate support services provided to them. These charges tend to increase
annually due to the increase in costs associated with provider services, pay
awards, and other inflationary increases such as utilities, NDR, fuel etc). The
amount of the budget adjustment was built into historic versions of the
Council’s Financial Strategy however there was no clarity over how the
adjustments were calculated or uplifted. This adjustment has been removed
however it does not affect the budget gap until 2026/27  (and beyond) as the
amount in the base budget in 2025/26 was not projected to increase from the
2024/25 level. Going forwards these estimated adjustments will be replaced
with actual increases as and when they are identified.    
Cost Pressures
4.7 Generally services work on the basis of having to contain any cost pressures
within current resources, however, there are cost pressures which are
unavoidable and need to be factored into future budget processes. There has
been one new cost pressure identified since the 6 March 2024 Budget report
to Council.
4.8 Cost Pressure 1 – Additional Support Needs
In 2024/25 there has been a significant increase in numbers of primary school

Page 4

children with severe and complex needs who require support, in particular in
mainstream schools.  The Council is taking measures to enable three schools
to manage the needs of these children in a responsive manner consistent with
the presumption to mainstream guidance. This has a recurring revenue
implication of £0.252m for associated staff costs.
Employee Costs
4.9 The Scottish Joint Council (SJC) 2024/25 pay award has still to be agreed and
this may have an impact on the base budget if the pay award is greater than
the 3% assumption allowed for in the budget.  The Teachers pay award has
been agreed up to 31 July 2024 as part of a previous 28 month deal and any
increase beyond that date has still to be negotiated.
4.10 For 2025/26 and beyond I had previously assumed pay awards of 3% in all
three scenarios with an expectation that future projected reductions in inflation
would take pressure off pay awards and also to reflect what is affordable to
Local Government.  On 26 April 2024, in relation to the 2024/25 pay award,
COSLA Leaders agreed to mandate the relevant spokesperson to enter into
negotiations with the Trade Unions with an overall financial envelope for of up
to 3.2% including discussions around terms and conditions. 
On this basis I have changed my assumptions to:
Scenario Annual Increase from 2025/26 Onwards
Best Case 3.2%
Mid-Range 3.2%
Worst Case 4.0%
The increase from 3% to 3.2% increases the estimated 2025/26 budget gap
by £0.352m.
There remains a risk that the pay award could be higher and this will be
monitored and updated throughout the year if more information becomes
available. Every 1% over and above what is budgeted would add an additional
pressure of circa £1.76m
Revised Mid-Range Estimated Budget Gap
4.11 Exhibit 2a sets out the revised cumulative estimated budget gap in the mid-
range in between 2025/26 and 2029/30 and Exhibit 2b summarises the total
cumulative budget gaps in all three scenarios. Exhibit 2a illustrates that, in the
mid-range scenario the Council are faced with a budget gap of £9.235m in
2025/26 rising cumulatively to £50.953m in 2029/30.  Exhibit 2b shows that
the cumulative 5 year gap ranges from £46.681m in the best case scenario to
£74.096m in the worst case.
Exhibit 2a – Revised Mid-Range Estimated Budget Gaps (Cumulative)
Para
Ref
2025/26
£000
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000

Page 5

Budget Gap  6 March 3.1 9,760 17,917 26,253 40,440 48,666
Additional Funding 4.2 (1,129) (1,129) (1,129) (1,129) (1,129)
Adult Social Care Pay
Uplift Funding
4.4 (3,916) (3,916) (3,916) (3,916) (3,916)
Adult Social Care Pay
Uplift Expenditure
4.4 3,916 3,916 3,916 3,916 3,916
Criminal Justice
Reducing Funding
4.5 1,697 1,697 1,697 1,697 1,697
Criminal Justice
Reducing Expenditure
4.5 (1,697) (1,697) (1,697) (1,697) (1,697)
Internal income
budget adjustment
4.6 0 76 442 808 1,174
ASN Cost Pressure 4.8 252 252 252 252 252
Increase in pay award
assumption
4.10 352 726 1,123 1,544 1,990
Revised Estimated
Budget Gap
9,235 17,842 26,941 41,915 50,953
Exhibit 2b – Estimated Budget Gaps (Cumulative) – Scenario Analysis
Budget Gap 2025/26
£000
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
Best Case 8,473 16,202 24,424 33,189 46,681
Mid-Range 9,235 17,842 26,941 41,915 50,953
Worst Case 13,787 26,909 40,607 54,940 74,096
2025/26 Budget Process
4.12 Given the scale of the financial challenge facing the Council in 2025/26 and
future years, it is important that immediate progress is made to identify saving
options with momentum on this maintained between now and setting the
budget in March 2024. The Senior Leadership Team held a budget session on
21 May 2024 to commence this process and will continue to meet periodically
to develop saving options which will be presented to members for their
consideration at an appropriate time.
Other Issues
Rebuilding Reserves
4.13 When setting a balanced 2024/25 revenue  budget on 6 March 2024 the
Council agreed the use of £3.077 million of temporary reserves and that a
report will be brought to Council in June to provide:
• an update on the £62.7m of additional funding to be distributed to local
government
• options to replenish the Council’s reserves.
4.14 Share of £62.7m
Since the 6 March 2024 budget meeting the Council’s share of the £62.7m

Page 6

has been confirmed as £1.129m (as per paragraph 4.1).
4.15 Revised Strathclyde Pension Fund Benefit
On 20 December 2023 a report to Council presented the financial benefit to
the Council as a consequence of the Strathclyde Pension Fund (SPF) Board
reducing employer pension contribution rate  in the years 2024/25 and
2025/26 (to 6.5%) and revert to a prudent estimate of a sustainable long-term
rate in 2026/27 of 17.5%.  This generated an estimated saving to the Council
of £21.327m over the three year period  which Council agreed to smooth over
a four year period thus generating £5.332m in savings in the years 2024/25 –
2027/28.
4.16 The December 2024 report stated that these figures were based on the staff
establishment in 2023/24 and still need to be uplifted to reflect the estimated
2024/25 salary calculations.  Furthermore they need to be uplifted to reflect a
revised assumption that pay awards will be 3.2% per annum from 2025/26
onwards (refer to paragraph 4.10)
4.17 These two factors have been built into a financial model and Exhibit 3
summarises the revised benefit
4.18 Exhibit 3 – Revised benefit from reduction in employer pension contributions
2024/25
£000
2025/26
£000
2026/27
£000
Total
December Council Report 9,963 9,963 1,401 21,327
Additional Benefit 1,051 1,381 240 2,672
Revised Benefit 11,014 11,344 1,641 23,999
4.19 In summary this increases the total benefit from the £21.327m reported in
December to £23.999m (a total increase over the three years of £2.672m).
This three year benefit should be used to rebuild the Council reserves. 
4.20 Release of Matched ESF Funding to General Fund
The last two European Structural Fund (ESF) Programme ran from 2007-2013
and then from 2015-2023. Each year the Council committed match funding to
the programme. Throughout the life of the programmes the Council faced
challenges and operated in effect at risk; due to the suspension of the
programme by the European Commission and uncertainty around cost model/
claiming process with the Scottish Government.  ESF funding was regarded
as the funder of last resort so the Council carried unspent matched funding
forward to mitigate against the risk of any shortfall between funding provided
and expenditure. 
4.21 ESF funding has come to an end and in May 2023 the Council submitted a
final notification of change to Scottish Government reducing the operational
cost and match funding of our final ESF operations. This has been accepted
by the Scottish Government. The Council finance team have now competed
the final reconciliations of associated income and expenditure and we are now
able to release the match funding that was being carried forward. In total

Page 7

£860,195 can be returned to the general fund.
Rebuilding Reserves Summary
4.22 Exhibit 4 summarises how the Council can rebuild its reserves over a three
year period. This illustrates that, in total the Council reserves can be
replenished by £4.661m over the three year period.  This exceeds the
£3.077m of ‘temporary’ reserves used to balance the 2024/25 budget by
£1.584m however it is recommended that the full £4.661m is committed to
rebuilding the reserves as we are currently anticipating an adverse variance in
2024/25 which will need to be funded from reserves.
4.23 Exhibit 4 – Strategy to Rebuild Reserves
Para 2024/25
£000
2025/26
£000
2026/27
£000
Total
Share of £62.7m 4.14 1,129 0 0 1,129
Increased Pension Benefit 4.18 1,051 1,381 240 2,672
Release of Matched Funding 4.21 860 0 0 860
Total 3,040 1,381 240 4,661
Internal Audit And Fraud Service Provision
4.24 On 23 November 2023 the now discontinued West Dunbartonshire Council
(WDC) / Inverclyde Council (IC) Shared Services Committee agreed to note
the continuation of shared Internal Audit and Fraud Services between WDC
and IC in the short to medium term and note that wider discussions will
continue with neighbouring councils on possible options to create a more
sustainable delivery model for Internal Audit and Fraud Services over the
longer term.
4.25 Since November informal discussions have been held with the Section 95
Officers of IC, WDC and Renfrewshire Council (RC) to explore possible
options and review a range of existing models across the other Scottish local
authorities.
4.26 Specifically in relation to their Internal Audit and Fraud Service all three
councils have concerns regarding recruiting and retaining staff and ensuring
sufficient resilience over service delivery. This has been evidenced recently by
a period of absence for the WDC/IC Shared Service Manager for Audit &
Fraud and the Chief Internal Auditor for RC is retiring imminently. 
4.27 It should be noted that no decisions have been made yet with preliminary
discussions focused on considering options with the opportunity to provide:
• improved resilience
• better career progression and staff development
• increased satisfaction and retention of key skills
• knowledge sharing to provide better outcomes for the three councils.
4.28 Before any options can be more formally explored, consideration will need to

Page 8

be given to issues such as (but not limited to):
• responsibilities, liabilities, and costs
• ensuring sufficient capacity to deliver internal audit across multiple
councils including associated bodies such as IJBs, Valuation Joint
Boards and other small bodies
• alignment of roles, salaries, grades and role descriptions
• any TUPE implications (if applicable).
4.29 In order to develop any options beyond preliminary discussions there is a
need to engage with the existing Internal Audit and Fraud teams, and
colleagues in Human Resources.  Any discussions of this nature can create
uncertainty for staff and members are therefore asked to consider whether
they wish the three S95 Officers to progress these discussions and bring back
a paper setting out options at an appropriate time. 
4.30 Teacher Numbers
As part of the 2023/24 Finance Settlement the Scottish Government withheld
£45.5m on the condition that councils maintained teacher numbers at the 2022
census level. The December 2023 census showed a reduction in teacher
numbers of 160 collectively across all Local Authorities.  For West
Dunbartonshire Council the teacher number dropped by 12 teachers.
Ultimately, the Scottish Government released the withheld £45.5m to all
councils, regardless of whether they maintained teacher numbers. 
For 2024/25 the Scottish Government has removed £145.5m from the General
Revenue Grant with this instead issued as a specific grant, conditional on
maintaining teacher numbers at the level set out in each Council’s grant letter.
For West Dunbartonshire Council the specific grant is £2.6m and there is an
expectation the Council will maintain 938 teachers (this being the figure
returned in the 2023 census) which is 8 teachers more than in the Council’s
base budget. 
To maintain a figure of 938 teachers would result in a cost pressure of
£0.480m. 
This situation applies to all Scottish councils. Discussions are continuing
between COSLA and the Scottish Government with an agreed approach to the
discussions and correspondence. At this stage the additional cost has not been
added to the budget gap but there remains a risk that if teacher numbers are
not maintained then some or all of the specific grant could be withheld. 
4.31 Health and Social Care Partnership Requisition
The Council, at the budget meeting on 6 March 2024, agreed an HSCP
requisition of £85.029m (subsequently increased to £88.945m to reflect the
adjustment detailed at paragraph 4.4). There is a working assumption that the
future allocation to the HSCP is on the basis of ‘flat cash’ plus the appropriate
share of the Health & Social Care funding commitments made by the Scottish
Government. However this is only an assumption and the HSCP requisition

Page 9

will be a matter for Council to consider as part of the budget process.
4.32 Council Tax 
The estimated budget gap makes no assumption over future Council Tax
increases as setting Council Tax is subject to a political decision when
agreeing the budget in March 2025. However, by means of illustration, a 5%
increase would generate approximately £2.0m in revenue.
4.33 Fees and Charges
In 2024/25 an increase of 10% was applied to fees and charges. The current
assumption built into the estimated future budget gaps is an annual increase
of 4% in all three scenarios (best case, mid-range and worst case). Every 1%
increase beyond 4% would generate an estimated £0.320m in revenue.
5. PEOPLE IMPLICATIONS
5.1 None directly from this report but there is a strong link between HR and
budgets.
6. FINANCIAL AND PROCUREMENT IMPLICATIONS
6.1 Sets out the estimated revenue budget gaps in 2025/26 to 2029/30. There are
no direct procurement implications arising from this report.
7. RISK ANALYSIS
7.1 None directly from this report but any proposals to address the estimated
budget gap will need to consider risk.
8. EQUALITIES IMPACT ASSESSMENT (EIA)
8.1 None directly from this report but any proposals to address the estimated
budget gap will need to consider equality issues.
9. CONSULTATION
9.1 The views of all Chief Officers have been requested on this report and
feedback incorporated herein.
10. STRATEGIC ASSESSMENT
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the strategic
priorities of the Council’s Strategic Plan.
10.2 The General Services revenue budget contributes to all categories by
providing funding in specific areas to help the Council achieve and develop
these priorities.

Page 10

Laurence Slavin
Chief Officer - Resources
Date:   22 May 2024
Person to Contact: Laurence Slavin, Chief Officer - Resources
E-mail: laurence.slavin@west-dunbarton.gov.uk
Appendices
Appendix 1 – Impact of 2024/25 budget decisions on estimated future budget
gaps
Background Papers
Finance Update to Council – 20 December 2023
Budget Report to Council - 6 March 2024
Appendix 1 – Impact of 2024/25 budget decisions on estimated future
budget gaps
2025/26 2026/27 2027/28 2028/29
6 March Budget Report Mid-Range
Budget Gap
15,053 23,260 31,596 45,783
6 March 2024 Council Decisions
Management Adjustments (1,122) (1,172) (1,172) (1,172)
Saving Options (3,679) (3,679) (3,679) (3,679)
Increase in Fees & Charges (492) (492) (492) (492)
Updated Mid-Range Budget Gap 9,760 17,917 26,253 40,440