Democracy Spraffa

Item 08 - Review of Integration Scheme

West Dunbartonshire Council · 19 June 2024
Back to West Dunbartonshire Council — 19 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by:  Beth Culshaw, Chief Officer West Dunbartonshire Health and
Social Care Partnership (HSCP)
Council Meeting of 19 June 2024
Subject: Review of Integration Scheme
1. Purpose
1.1 The purpose of this report is to seek West Dunbartonshire Council
approval for the Integration Scheme between West Dunbartonshire
Council and NHS Greater Glasgow and Clyde.
2. Recommendations
It is recommended that West Dunbartonshire Council:
2.1 Approve the Integration Scheme between West Dunbartonshire Council
and NHS Greater Glasgow and Clyde (Appendix I)
3. Background
3.1 Integration Schemes (based on a model integration scheme developed by
the Scottish Government) were published by all Integration Joint Boards
within the NHS Greater Glasgow and Clyde Health Board area as part of
the implementation of the Integration Joint Boards (known locally as the
HSCP Partnership Board). The Schemes set out the key arrangements for
how Health and Social Care Integration is to be planned, delivered and
monitored within their local area.
3.2 Integration Schemes are required by statute to be reviewed within a
“relevant period” of five years from initial publication. The Schemes for
Integration Joint Boards across the NHS Greater Glasgow and Clyde
Health Board area received parliamentary approval at different times and
are therefore subject to different review schedules. In order to ensure
consistency, where possible, across the six Integration Joint Boards and to
reduce duplication of effort, in 2019 it was agreed to carry out simultaneous
reviews to enable revised Schemes to be approved at the same time.
3.3 West Dunbartonshire Integration Scheme was the first to go live and at that
time was reaching the end of its relevant period in June 2020.
3.4 On the 26 February 2020, West Dunbartonshire Council considered a
report from the Chief Officer, West Dunbartonshire Health and Social Care
Partnership on this matter and agreed to note the content of the report and
to approve the draft revised Integration Scheme for consultation.
3.5 On the 25 February 2020, Greater Glasgow and Clyde Health Board
considered a similar paper.  The extract of the minute of that meetings
ITEM 8

Page 2

shows that “due to time constraints, Prof Brown proposed that this item
also be deferred to the Board Seminar Session, which would take place in
March [2020], to ensure sufficient time for consideration and approval.
Members were content to accept this approach.”
3.6 Given the timing of this initial phase of work Members will be unsurprised to
learn that due to the global pandemic the NHS Board Seminar Session
referenced in paragraph 3.5 did not go ahead and this work fell into
abeyance as dealing with Covid-19 became the focus of collective
endeavors.  
3.7 This afforded officers a period of further review and reflection and in 2022
the work was reinvigorated with a pan Glasgow HSCP working group re-
established to consider the content of the Integration Scheme.  This group
have considered how all six Integration Schemes can be more effectively
aligned in terms of language and format with the aim of developing revised
Integration Schemes for approval by all six local authorities, the Health
Board and ultimately the Cabinet Secretary.
3.8 On the 25 October 2023 West Dunbartonshire Council considered a report
submitted by the Chief Officer, Health and Social Care Partnership
providing an update on work ongoing to review the Integration Scheme
between West Dunbartonshire Council and NHS Greater Glasgow and
Clyde, and presenting a draft revised Integration Scheme for comment and
approval to go out for consultation.   West Dunbartonshire Council agreed
to instruct officers to consult prescribed consultees in line with the Public
Bodies (Joint Working) (Scotland) Act 2014.
3.9 The Greater Glasgow and Clyde Heath Board Finance, Planning and
Performance Committee considered a similar paper on 3 October 2023
and granted their approval to start consultation on the Integration
Schemes.   
3.10 As a result of the two aforementioned approvals a period of formal
consultation was launched from the 1 December 2023 to the 31 January
2024.  Only one response was received, this was from West
Dunbartonshire Council and can be found at Appendix II of this report.
4. Main Issues
4.1 A review of the Integration Schemes has taken place both locally and by
the pan Glasgow working group and has identified a series of required
edits.
4.2 This group also considered areas that are consistent across all pan
Glasgow Integration Schemes and present for consideration updates and
standardisation of content to achieve a higher level of consistency across
Integration Schemes and to reflect the position within Integration Joint
Boards for each area of the Integration Scheme that may have changed
since Integration Schemes were originally published.  
4.3 The core content and structure of the draft revised Integration Scheme

Page 3

remains consistent with the current Integration Scheme, and therefore
retains its close alignment with the model Integration Scheme approved by
the Scottish Government and the requirements laid out within the Public
Bodies Joint Working Integration Scheme Scotland Regulations 2014. 
4.4 Key areas of the Scheme that required review and revision to the text
included the sections on Finance, Risk Management, Complaints and
Information and Data Handling to reflect legislative changes and actual
operational delivery. 
4.5 The key substantive change proposed is in relation to Section 3 (Local
Governance Arrangements) where it is proposed that the term of the
Chair/Vice Chair of the Integration Joint Board is reduced from three years
to two years. This brings the term in West Dunbartonshire into line with that
of the other Integration Joint Boards in the Greater Glasgow area.  
4.6 Content in relation to Section 12 of the Integration Scheme (Finance) was
reviewed by the HSCP Chief Finance Officers Group, who developed
revised text and presented this to the pan Glasgow working group with the
recommendation that this be adopted by all Integration Joint Boards within
the Greater Glasgow area with some minor local variations.
4.7 The section on Local Operational Delivery Arrangements has been
revised in how the arrangements for Hosted Services are described.
Previous iterations of all Schemes contained an annex that listed the
services subject to hosting arrangements and which HSCP area was
responsible for those services across the Board territory. This has now
been removed not only to futureproof the Schemes from any
subsequent changes but to emphasise that the Scottish Government
approves the Schemes but not specific hosting arrangements which are
agreed locally. The Schemes instead now simply describe how hosting
arrangements are to be implemented.
4.8 The pan Glasgow group has been in regular contact with the Scottish
Government on processes and timescales to obtain Cabinet Secretary
approval for revised Schemes. Advice and guidance was also sought on
any areas within Schemes that the Scottish Government has knowledge of
from their experience nationally which generally required improvement. 
4.9 The draft revised Integration Scheme was shared with colleagues in West
Dunbartonshire Council Legal Services to gain a legal perspective on
whether the Integration Scheme meets the statutory requirements
surrounding review and development of Integration Schemes laid out in the
Act.  Appendix II details the feedback received from West Dunbartonshire
Council during the formal period of statutory consultation, the required
amendment can be found in the Integration Scheme (Appendix I)
paragraph 9.5.
4.10 It is anticipated that NHS Greater Glasgow and Clyde will consider all six
Integration Schemes for approval on the 25 June 2024.  If approved by
both West Dunbartonshire Council and NHS Greater Glasgow and Clyde

Page 4

the Scheme will be presented to the Integration Joint Board for noting and
subsequently submitted to the Cabinet Secretary for Ministerial approval.   
5. Options Appraisal
5.1 An options appraisal is not required in respect of the recommendations
within this report.
6. People Implications
There are no people implications in respect of the recommendations within
this report.
7. Financial and Procurement Implications
7.1 There are no financial and procurement implications in respect of the
recommendations within this report.
8. Risk Analysis
8.1 There is no direct link with West Dunbartonshire Councils Strategic Risk
Register.   Should West Dunbartonshire Council not approve the
recommendations in this report the operational risk is minimal as an
approved Integration Scheme remains in place.  However, there is a
reputational risk should this work not progress in line with Scottish
Government requirements.
9. Equalities Impact Assessment (EIA)
9.1 An Equalities Impact Assessment is not required as the recommendations
within this report do not directly impact on those with protected
characteristics.   (EQIA screening reference 1063).
10. Environmental Sustainability
10.1 A Strategic Environmental Assessment (SEA) is not required in respect
of the recommendations within this report.
11. Consultation
11.1 Relevant Council Officers have been consulted in the preparation of this
covering report and their comments incorporated appropriately.  
12. Strategic Assessment
12.1 The delivery of West Dunbartonshire Councils Strategic Plan 2022 – 2027
is dependent on a wide range of services with good governance an
enduring theme throughout the plan.
12.2 Consideration and ultimately approval of the Integration Scheme ensures: 
that resources are directed in accordance with agreed policy and
according to priorities; that there is clear and inclusive decision making,

Page 5

and provides clarity in respect of the accountability for the use of those
resources and functions delegated to the Integration Joint Board.
Beth Culshaw 
Chief Officer West Dunbartonshire Health and Social Care Partnership
23 May 2024
Person to Contact: Beth Culshaw 
Chief Officer West Dunbartonshire Health and Social
Care Partnership 
Email:   beth.culshaw@ggc.scot.nhs.uk
Appendices: Appendix I:  Revised Integration Scheme
Appendix II:  Consultation Response West
Dunbartonshire Council
Wards Affected: All Wards

Page 6

No embedded text on this page.