Agenda 
West Dunbartonshire Council 
Date:  Wednesday, 27 March 2024
___________________________________________________________________ 
Time:  16:00
___________________________________________________________________ 
Format:      Hybrid meeting 
___________________________________________________________________ 
Contact:    Carol-Ann Burns, Senior Democratic Services Officer  
Email: carol-ann.burns@west-dunbarton.gov.uk   
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of West Dunbartonshire Council as detailed above.   
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive 
Page 1

Page 2

Distribution:- 
Provost Douglas McAllister Councillor June McKay
Councillor James Bollan  Councillor John Millar
Councillor Ian Dickson Councillor Karen Murray Conaghan
Councillor Diane Docherty Councillor Lawrence O’Neill
Councillor Craig Edward Councillor Lauren Oxley
Councillor Gurpreet Singh Johal Councillor Chris Pollock
Councillor Daniel Lennie Councillor Martin Rooney
Councillor David McBride Councillor Gordon Scanlan
Councillor Jonathan McColl Councillor Hazel Sorrell
Councillor James McElhill Councillor Clare Steel
Councillor Michelle McGinty Councillor Sophie Traynor   
Chief Executive
Chief Officers 
Date of issue:  14 March 2024 
Audio Streaming 
Audio recordings of the meeting (including the attendance or contribution of any
party participating or making a contribution) will be published on the Council’s
website and the Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including,
but not limited to, for the purpose of keeping historical records and making those
records available via the Council’s internet site. 
Page 2

Page 3

WEST DUNBARTONSHIRE COUNCIL 
WEDNESDAY, 27 MARCH 2024 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on the agenda and the reasons for such declarations. 
4 RECORDING OF VOTES 
The Council is asked to agree that all votes taken during the meeting will be
done by roll call vote to ensure an accurate record. 
5 MINUTES OF PREVIOUS MEETINGS 
Submit for approval, as correct records, the undernoted Minutes of Meetings of
West Dunbartonshire Council:- 
(a)  Ordinary meeting – 20 December 2023; and    9 – 30
(b)  Budget meeting – 6 March 2024     31 – 39 
6 MINUTES OF MEETING OF AUDIT COMMITTEE   41 – 43
Submit for information, and where necessary ratification, the Minutes of
Meeting of the Audit Committee held on 13 December 2023. 
7 OPEN FORUM
The Council is asked to note that no open forum questions have been
submitted by members of the public.        
8/ 
Page 3

Page 4

8 DC23/149/FUL: ERECTION OF 128 RESIDENTIAL   45 – 77 
HOMES, ASSOCIATED ROADS, INFRASTRUCTURE 
AND OPEN SPACE ON EXISTING BROWNFIELD SITE, 
RESIDENTIAL DEVELOPMENT SITE, ABBOTSFORD ROAD, 
CLYDEBANK BY MILLER HOMES. 
Submit report by the Chief Officer – Regeneration and Regulatory seeking
planning permission approval, subject to the conditions set out in the report. 
9 GLASGOW CITY REGION CITY DEAL – UPDATE   79 – 82 
Submit report by the Chief Officer – Regulatory and Regeneration advising of
the progress with the implementation of the Exxon Infrastructure Project, and
providing an update on Glasgow City Region City Deal Programme 
10 TREASURY MANAGEMENT STRATEGY AND ANNUAL  83 – 115
INVESTMENT STRATEGY 
Submit report by the Chief Officer – Resources seeking approval of the
proposed Treasury Management Strategy Statement and Annual Investment
Strategy. 
11 GENERAL SERVICES BUDGETARY CONTROL REPORT TO  117 – 171
31 JANUARY 2024 (PERIOD 10) 
Submit report by the Chief Officer – Resources providing an update on the
General Services revenue budget and the approved capital programme to 31
January 2024.   
12 HOUSING REVENUE ACCOUNT (HRA) BUDGETARY   173 – 192 
CONTROL REPORT TO 31 JANUARY 2024 (PERIOD 10)          
Submit report by the Chief Officer – Resources providing an update on the
financial performance to 31 January 2024 (Period 10) for the HRA revenue
budget and the HRA capital budget. 
13 REPRESENTATION ON OUTSIDE BODIES    197 – 202 
Submit report by the Chief Officer – Regeneration and Regulatory requesting
that consideration be given to making a nomination to the Blindcraft Trust. 
14/
Page 4

Page 5

14 CLYDEPLAN AND REGIONAL       203 – 213
SPATIAL STRATEGY GOVERNANCE ARRANGEMENTS 
Submit report by the Planning, Building Standards and Environmental Health
Manager seeking permission to formally withdraw from the Clydeplan Joint
Committee and agree to transfer the responsibility for the development of a
Regional Spatial Strategy to the Glasgow City Region Cabinet. 
15 NOTICE OF MOTIONS 
(a) Motion by Councillor Jim Bollan – Equal Pay Claims 
Council recognises the steps taken by West Dunbartonshire Council in the past
to settle equal pay claims, but that pay discrimination remains an ongoing issue
in local authorities across Scotland; believes that all Scottish local authorities
must learn the lessons of the past and that it is incumbent on all Councillors –
especially Council Leaders – to demonstrate and exercise political leadership in
ending pay discrimination and securing equal pay for equal value work.  
Council believes that West Dunbartonshire Council and West Dunbartonshire
Leisure Trust have an equal pay issue due to a disparity in the levels of pay
received by those in male-dominated roles i.e. craft roles, compared to those in
female-dominated roles; notes that these roles are carried out by workers –
predominantly women – in the heart of communities on the frontline of our
public services; and notes the invitation from GMB Scotland to the council’s
workforce to lodge equal pay claims.  
Council notes that West Dunbartonshire Council has carried out a job
evaluation for certain female-dominated roles, but believes the job evaluation
scheme may have increased the value of those roles in contradiction to the
precedent set by the Employment Tribunal against Fife Council1.  
Council believes that equal value work must result in equal pay and equal
terms and condition; that roles currently being underpaid must be brought up
with no detriment to those currently in receipt of higher pay; and notes the
consultative ballot carried out by GMB Scotland which demonstrated 100%
support for industrial action by craft workers if pay inequality is not addressed
by bringing everyone up.  
Council resolves to set an example for other local authorities in delivering equal
pay by working with trade unions to negotiate compensation for lost wages for
those workers who have been the victim of pay discrimination, and carrying out
a fair job evaluation which takes full account of the Employment Tribunal ruling
against Fife Council. 
1 https://www.gov.uk/employment-tribunal-decisions/mrs-y-allan-and-
others-v-fife-council-4102824-slash-2016-and-others
(b)/
Page 5

Page 6

(b) Motion by Councillor Jonathan McColl – Transfer / Lease of Community
Facilities 
Council notes that despite the best efforts of officers, timing and resource
issues have made the process for transferring/leasing Council facilities as a
result of budget decisions difficult. This has led to concerns being raised by
Councillors in recent Committee meetings.  
To assist Elected Members to better understand the differences in process and
consider how we could enable officers to better meet the needs of our
communities, Council asks that a report be brought to a future Council or IRED
Committee for the purpose of: 
• Outlining the current process being followed for leasing/community asset
transfer of Council owned facilities. 
• Proposing changes to the process to facilitate proper discussions with
current users of facilities prior to bringing reports to committee for
agreement. 
• Proposing any further changes that can make the process more
transparent and ensure officers are able to provide Councillors with all
the information we require to make informed decisions, including
proposed rent levels and any non-standard conditions of the
lease/transfer. 
It may be useful to have an Elected Members’ seminar on this topic in advance
of a report being brought to committee. 
(c) Motion by Councillor Jim Bollan – Unison Charter 
Council agrees to adopt, support and implement the Unison Charter as follows: 
“To qualify for the UNISON Violence At Work Charter mark, employers must
meet the following standards: 
1. The employer has a written violence and aggression at work policy, which is
available to all staff. The policy should also cover lone working. 
2. Responsibility for implementing these policies lies with a senior manager. 
3. Measures are taken to reduce staff working in isolated buildings, offices or
other work areas to a minimum. 
4. Staff are encouraged to report all violent incidents and they are told how to
do this. 
Page 6

Page 7

5. The employer collects and monitors data on violent incidents on a regular
and ongoing basis. 
6. Where they are in place, union safety reps are able to access this data and
are consulted on solutions to issues relating to violence in the workplace. 
7. Thorough risk assessments are conducted for staff placed in vulnerable
situations. 
8. The employer has support pathways in place for staff who are victims of
violence at work, so that they know where to turn for advice and support. 
9. Training to ensure staff are aware of the appropriate way to deal with
threatening situations. 
10. Where appropriate, independent counselling services are available to staff
who are the victims of violence at work” 
(d) Motion by Councillor Michelle McGinty – Immediate Resignation of
Convicted Criminal Councillor Craig Edward 
This Council calls on Councillor Craig Edward to resign from his position as an
Elected Member on West Dunbartonshire Council with immediate effect. 
Edward has demeaned the public office to which he was elected and abused
the trust placed in him by local residents. 
On 14th February 2024 Edward pled guilty at Dumbarton Sheriff Court to a
number of serious sexual offences. 
Prior to being elected in 2022 Edward was a community activist and served on
a variety of committees like housing associations, tenants associations, and a
mental health charity. 
Edward was also an active member in two political parties over recent years. 
It has become clear that Edward has duped our whole community in getting
them to place their trust in him. 
Council agrees that Edward is not fit to remain in his role as an Elected
Member and in the event that he fails to do the right thing and resign, this
Council calls on the Chief Executive to take all the necessary action required to
remove him from office. 
(e)/ 
Page 7

Page 8

(e) Motion by Councillor Karen Murray Conaghan – Equalities Act    
Council notes it’s responsibilities under the Equality Act, to make reasonable
adjustments to facilitate the participation of disabled people in the democratic
processes of Council.  
In the case of Council meetings, the interpretation of this duty falls to the
Provost.  
To ensure that there is no misinterpretation, Council agrees that Standing
Orders will be updated by the Monitoring Officer to include a provision as
follows:  
That the Provost be required to call a minimum of a 10-minute recess where,  
1. A motion to set the General Services budget in full or part is moved and,  
2. Any Elected Member has requested such a recess. 
Note: Members are asked to note that the suspension of Standing Order
20 (d) will be required in order to consider this motion, using the
procedure provided in Standing Order 28.
Page 8

Page 9

WEST DUNBARTONSHIRE COUNCIL
At a Hybrid Meeting of West Dunbartonshire Council held in the Civic Space, 16
Church Street, Dumbarton on Wednesday, 20 December 2023 at 4.08 p.m.
Present: Provost Douglas McAllister and Councillors Jim Bollan, Ian
Dickson, Diane Docherty, Craig Edward, Gurpreet Singh Johal,
Daniel Lennie, David McBride, Jonathan McColl, James
McElhill, Michelle McGinty, June McKay, John Millar, Karen
Murray Conaghan, Lawrence O’Neill, Lauren Oxley, Chris
Pollock, Martin Rooney, Gordon Scanlan, Hazel Sorrell, Clare
Steel and Sophie Traynor.
Attending: Peter Hessett, Chief Executive; Alan Douglas, Chief Officer –
Regulatory and Regeneration (Legal Officer); Laurence Slavin,
Chief Officer – Resources and Section 95 Officer; Peter Barry,
Chief Officer – Housing and Employability; Amanda Graham,
Chief Officer – Citizen, Culture and Facilities; Gail Macfarlane,
Chief Officer – Roads and Neighbourhood; Laura Mason, Chief
Officer – Education; Beth Culshaw, Chief Officer – Health &
Social Care Partnership; Lesley James, Head of Children’s
Health, Care and Justice Services; Michelle Lynn, Assets Co-
ordinator; Gillian McNamara, Economic Development Manager;
Allison McBride, Strategic People & Change Manager; George
Hawthorn, Manager of Democratic and Registration Services;
and Carol-Ann Burns, Senior Democratic Services Officer.
Also attending: Tom Reid, Audit Director, Mazars
Provost Douglas McAllister in the Chair
STATEMENT BY CHAIR
Provost McAllister advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
ITEM 5(a)
Page 9

Page 10

RECORDING OF VOTES
The Council agreed that all votes taken during the meeting would be done by roll call
vote to ensure an accurate record.
MINUTES OF PREVIOUS MEETINGS
The Minutes of Meetings of West Dunbartonshire Council held on 25 October 2023
(Ordinary, 8 November 2023 (Requisitioned), and 29 November 2023
(Requisitioned) were submitted and approved as correct records.
INVERCLYDE COUNCIL AND WEST DUNBARTONSHIRE COUNCIL SHARED
SERVICES JOINT COMMITTEE
(a) Report by Chief Officer – Regulatory and Regeneration
A report was submitted by the Chief Officer – Regulatory and Regeneration in
relation to the future of shared services arrangements between Inverclyde
Council and West Dunbartonshire Council and seeking endorsement of the
decision of the Shared Services Joint Committee taken on 23 November 2023
to wind up the joint committee and to pursue a different model of joint working.
Having heard the Chief Officer in answer to Members’ questions, the Council
agreed:-
(1) to endorse the decision of the Shared Services Committee held on 23
November 2023 to:-
(a) to approve the winding up of the Joint Committee;
(b) to note the continuation of shared Internal Audit services
between West Dunbartonshire and Inverclyde Councils in the
short to medium term, subject to a service level agreement; and
(c) to note that wider discussions would continue with neighbouring
Councils on possible options to create a more sustainable
delivery model for Internal Audit services over the longer term.
(b) Minutes of Meeting
The Minutes of Meeting of the Shared Services Joint Committee held on 23
November 2023 were submitted and all decisions contained therein were
approved.
Page 10

Page 11

OPEN FORUM 
The Provost advised that the undernoted Open Forum questions had been received
from Mr Drew McEoghainn, Mr David Smith, UNISON, and Ms Cara Thom and
invited each to put their question to Council. 
(a)  Question from Drew McEoghainn 
On WDC's recent cuts consultation, why wasn't there an option for people to
tick that they wanted a needs based budget? 
Councillor Lennie provided the following response:- 
The Council is committed to making West Dunbartonshire a better place to
live, work, learn and visit for all despite facing a significant and ongoing
financial challenge.
As part of the development of the Council’s Strategic Plan - a key document
which guides the Council’s direction over the 2022-2027 period - an extensive
Strategic Needs Assessment was undertaken to understand community need. 
The Strategic Needs Assessment, which is available publicly, was derived
from data and evidence on our communities and residents. It identified the
key priority areas for focus and formed the basis for the development of the
Strategic Plan’s aims and objectives. 
As the Budget Conversation questions were based around the key priority
needs as identified in the Strategic Plan, they too reflect the outcome of the
Strategic Needs Assessment. 
The online budget conversation asked residents to rate activities of services
based on their importance to the individual under headings which aligned with
the priority areas of Our Communities; Our Environment; Our Economy; and
Our Council. 
In addition, participants were also given an opportunity to submit further
feedback through the use of free text boxes throughout the questionnaire and
at the conclusion. 
On the Budget Conversation’s dedicated webpage and within the survey itself,
participants were provided with links to the Strategic Plan which detailed the
outcome of the Strategic Needs Assessment, and the Council’s key priorities
and commitments. 
A total of 771 people participated in the Budget Conversation over a six week
period, with 507 additional comments made in the free text boxes on the four
priorities. In the main, these comments focused on a desire for the Council to
cease making service cuts.
Page 11

Page 12

A total of 953 responses were received to questions about services that
should be protected and services where participants would target spending
reductions. 
To supplement the online consultation, five focus group sessions were held
with a range of representatives from local community organisations within
Dumbarton/Alexandria and Clydebank as well as with the West
Dunbartonshire Equality Forum and the Trade Unions. 
The Council has a statutory duty to set a balanced budget each year and with
a current expected budget gap of around £17m, the aim of the Budget
Conversation process was to identify what services are most important to
residents. 
This feedback, along with evidence of need, knowledge of services and
analysis of service performance will allow Elected Members and Chief Officers
to make informed decisions. 
Mr McEoghainn asked the following supplementary question:- 
• We have had over £35m of cuts and we expect a further £50m over the next 5
years.
• You have considered going to a four-day week in education, reducing
transport for our kids going to school. 
• You have asked the Chief Education Officer to find yet more cuts three years
after the same Director of Education said “education had been cut to the
bone”!
• You’ve closed community centres.
• Increased the charges for the care of garden scheme and changed its
eligibility criteria. 
• Reduced bin collections.
• Reduced the hours of our recycling centres.
• Cut advice services to our most vulnerable.
• This isn’t even mentioning the dangerous and ludicrous decision to move
Balloch library into a glorified cupboard in the premises of three schools. 
So with West Dunbartonshire being in the bottom 20 % of most deprived areas
over 48 data zones in accordance to Scottish indices of multiple deprivation when
will this labour administration tell the governments in Edinburgh and London that
the tory, SNP and soon to be Starmer’s austerity programme will not be inflicted
upon the people of West Dunbartonshire follow their “comrades” from the labour
party in Glasgow who stated “they will simply have no part in a budget process
which will wreak havoc on our city and damage those most in need” action
backed with gusto by their leader Anas Sarwar! 
My question is: when will this Labour administration say “enough is enough”? 
Councillor Lennie thanked Mr McEoghainn for his supplementary question and
advised a response would be provided in writing.
Page 12

Page 13

(b) Question from David Smith, UNISON
Should West Dunbartonshire elected councillors set a NO CUTS budget, what
would happen?
Councillor Lennie provided the following response:-
West Dunbartonshire Council, under the Local Government Finance Act 1992,
is required to set a balanced budget. In particular Section 70 of the Act
requires councils to impose a council tax that meets expenses not otherwise
met through other means.
For West Dunbartonshire Council to set a ‘no cuts’ budget would require them
to generate £287.6m of income, that being the total estimated 2024/25
expenditure budget if no reductions in service were agreed.
Based on the Council’s S95 Officer current estimate the Council will receive
£265.2m of funding in 2024/25 through a combination of Scottish government
funding and Council tax income.  That leaves a shortfall of £22.4m prior to any
measures to balance the budget that have already been agreed by Council in
December 2022 and March 2023.
These measures include application of the Service Concessionary Financial
Flexibility and saving options agreed in December 2022 and March 2023
which have a further financial effect in 2024/25.  
Once these are factored in the Council has an estimated budget gap of
£16.97m. This is before any decision is taken on the use of the financial
benefit generated by the reduction in the employer’s pension contribution
rates.
Therefore, to be compliant with the Local Government Finance Act 1992, if
the Council agrees a no cuts budget, they would need to generate £16.97m
through Council tax increases.  This would require a Council Tax increase of
42%.  The Scottish Government has announced a Scotland wide Council Tax
freeze which removes any scope for the Council to determine the required
council tax increase.
If the Council do not agree a balanced budget the Council’s S95 Officer is
required to notify the Chief Executive and consider consultation with the
Council’s external auditors.  There would then need to be a report submitted
by the S95 Officer to full Council for consideration within 21 days. In that time
period the Council is prevented from entering into any agreements incurring
expenditure until the full council has considered the report. 
After considering the report, the full council is required to prepare a report
which specifies what action it proposes to take in response and the planned
timescales.
Page 13

Page 14

Where a council does not take the appropriate action in response to the S95
officer’s report or such a report is not prepared, where external audit consider
it appropriate, they would advise Audit Scotland so that the Controller of Audit
can take the appropriate action. This may include the Controller of Audit
making a report to the Accounts Commission under section 102 of the Local
Government (Scotland) Act 1973 which may lead to a hearing and ultimately
could lead to suspension or disqualification of members of the Council.
Mr Smith asked the following supplementary question:-
You told us in previous forums and other meetings that the Scottish
Government administrators would come in and make the cuts if we set no
cuts budget, what evidence can you present to the Council tonight to
substantiate your view that Scottish Government administrators would come
in here and make the cuts and can you tell us where this has happened
before in Scotland?
Councillor Lennie thanked Mr Smith for his supplementary question and advised a
response would be provided in writing.
(c) Questions from Cara Thom
(i) Scottish Library and Information Council (SLIC) - have published
information on Data Poverty and Digital exclusion. They state that
reliance on digital increased exponentially during significant national
lockdowns and libraries are at the centre of the collaborative effort to
ensure no one is left behind in the new digital landscape as envisioned
in A Changing Nation: How Scotland will Thrive in a Digital World
(2021).
1 in 7 people across Scotland experience data poverty, rising to 1 in 4
in lower income households. 1 in 5 of those experiencing data poverty
depended on libraries for access pre-pandemic.
Public libraries will continue to offer vital access and ongoing digital
support that embrace both the challenges and the opportunities that
the digital world presents. Balloch Library was heralded as the best
equipped computer suite offering free Wi-Fi outside Glasgow following
the £100,000 investment made to the library in 2017.
My question is: - Please explain to the community why, in this area of
high deprivation, the Council has made the decision to increase Data
Poverty and Digital Exclusion by reducing the number of computers
available at Balloch Library, once heralded as the best equipped
Computer suite outside Glasgow, from 8 to 3?
Page 14

Page 15

Councillor Lennie provided the following response:-
In the current financial year, the Council faced a £21million budget gap and in
the coming year we anticipate a deficit of around £17million between the
money we need to run our services and the income we receive. 
We therefore have to consider ways of saving money while still delivering the
vital services our residents rely on.
The decision to co-locate the library into another building was taken as part of
the Council budget setting in March 2023 with the co-location preserving local
library provision for residents in Balloch, Haldane and surrounding areas and
protecting jobs.
We recognise and value the contribution of our libraries to our communities,
literacy and learning and in particular to digital learning and that is why we
have maintained local provision with eight branch libraries in West
Dunbartonshire in addition to our school and mobile library service.
The service collates data on computer usage and the PCs at Balloch Library
are on average used for just over 20% of their available time. We are
therefore confident that we can continue to meet demand with a reduced
number of PCs and will also supplement this by providing mobile devices for
public use.
(ii) At present, Balloch Library has a footprint of 270 square metres, but
the plans for Balloch School Campus show that the new library will be
roughly 50 square metres (not including toilets) formed from the head
teacher’s office, part of the nursery teachers' staffroom and the printer
room, all of which are necessary to the running of the school/nursery.
With a reduction of around 80%, this is a tiny amount of space, totally
inadequate for a library. We refer to your public service provision policy
and say that the council need to demonstrate that such a percentage
decrease is justifiable.
We believe that there will be a limit to the number of people who can
be in the new library space at the same time, which will affect critical
community services, like Bookbug, which is not just for a child's early
year's development, but social interaction for children and caregivers.
My question is:-Regarding Policy PS 1 - Public Service Provision
Section 11.4, do you have data on the number of library users and
when they attend?
Councillor Lennie provided the following response:-
The current Balloch library has a floor space of 192 m2 and the new co-
located library space is 55m2. The head teacher’s office, staff area and printer
room are being provided in other available space within the building which
Page 15

Page 16

does not affect any teaching space or occupancy of the building or impact on
any other provision within the building.
We are committed to the continued local provision of Bookbug and other
community activities.
Policy PS1 of the adopted West Dunbartonshire Local Plan seeks to protect
public utility, social and community facilities identified on the Proposal Map.
The policy requires in advance of the disposal of any Council building,
the disposal strategy would first explore options for alterative community use.
This justification would be required with any future development proposal for
the building, therefore Policy PS1 is not relevant in the context of the decision
to relocate the service. 
The adopted local plan (2010) is 13 years old and more weight is likely to be
given to the more up to date National Planning Framework 4 (2023) which
forms part of the development plan and proposed Local Development Plan
(2020 as modified) when assessing any future development proposals for the
building. 
I can confirm that in line with policy PS1 community use of the library building
will be explored when considering future disposal options
Ms Thom asked the following supplementary question:-
I agree that the policy doesn’t apply directly to Balloch Library, however, the
policy does state “Prior to the closure of any community facility” so this part
would apply, can you revisit the original question about numbers of library
users and when they attend.  (The section of the policy document I'm referring
to is detailed below).
11.4 Policy PS 1 - Public Service Provision - The Council will seek to protect
established public utility, social and community facilities as identified on the
Proposals Map. 
‘Prior to closure of any community facility, the Council will need to
demonstrate that the community facility is no longer needed’
Once no longer needed, the Local Plan should provide for reuse of surplus
community facilities. In considering any proposed change of use, the Council
will have regard to the character and amenity of the surrounding area, other
Local Plan policies and whether the loss of the facility would have a significant
adverse impact on the community.
Councillor Lennie thanked Ms Thom for her supplementary question and advised a
response would be provided in writing.
Page 16

Page 17

(iii) The letter from the Council in October told parents that all renovations
would be completed by the beginning of 2024. They were told the
library will open early that year.
We the community are very worried about the risk to both children and
library users. Our concerns include the following: Scottish Government
policy gives guidance on the purpose of Spare Capacity within a
School.
It is there NOT for the purpose of establishing a public facility like a
library within a school estate. It is there to ensure that a school has the
capacity to fulfil future rises in population, e.g., new housing like the
flats being built on the grounds of The Stables Restaurant.
The Chief Officer: Citizen, Culture and Facilities quoted Balloch
Primary school at the council meeting on the 8 November as operating
at 69% capacity. The current number of pupils in Balloch Primary is
301. This equates to an 81% capacity.
My question is: - Can you please investigate, and re-assess, the Chief
Officer: Citizen, Culture and Facilities' figure of 69% which we believe
is based on data from the previous school year and is now out-of-date.
Councillor Lennie provided the following response:-
Work has commenced on the site and, following engagement with education,
is being undertaken outwith school hours to minimise disruption to school
activities.
The works are being carried out in two phases, to the upper floor creating the
new head teacher’s office, meeting and storage space and to the lower floor
to develop the new library space. 
Parents/carers were advised the new library would open early in 2024 and It
is currently anticipated work will be completed in March 2024.
In relation to occupancy figures, all Local Authorities are required to report on
this annually to the Scottish Government.
The figures provided by the Chief Officer previously were the most recent
figures reported to Scottish Government and were on the basis of a school roll
of 298 which is calculated at a 69.626% occupation.
The current school roll is 301, an increase of 3 pupils from previous and this
equates to an occupation of 70.69%. 
School capacity measures how many pupils can be taught in a school based
on the number and size of teaching spaces available. As the new Balloch
Library will be located in an area that has never been considered or used as a
teaching space, it will have no impact on school capacity.
Page 17

Page 18

I have been further advised that when the school was built the roll capacity
was calculated taking into account any future development which may occur
in the catchment area 
Ms Thom asked the following supplementary question:- 
Can you please make public the risk assessments that were carried out in the
school campus to ensure the existing safety measures can apply whilst
incorporating a viable public library? 
Councillor Lennie thanked Ms Thom for her supplementary question and advised a
response would be provided in writing. 
CHIEF SOCIAL WORK OFFICER ANNUAL REPORT 
A report was submitted by the Head of Children’s Health, Care and Justice Services,
(Chief Social Work Officer) providing the Chief Social Work Officer (CSWO) Annual
Report for 2022-23 which provided information on the statutory work undertaken on
the Council’s behalf, including a summary of governance arrangements, service
delivery, resources and workforce. 
After discussion and having heard the Head of Children’s Health, Care and Justice
Services Chief Social Work Officer in further explanation and in answer to Members’
questions, the Council agreed to approve the content of the Chief Social Work
Officer Annual Report 2022-23 and approve its submission to the Office of the Chief
Social Work Advisor to the Scottish Government. 
REVIEW OF POLLING DISTRICTS AND POLLING PLACES 2023 
A report was submitted by the Chief Officer – Regulatory and Regeneration advising
of the response to the consultation on the review of polling districts and polling
places and seeking approval of the final polling scheme. 
After discussion and having heard the Manager of Democratic and Registration
Services in further explanation and in answer to Members’ questions, the Council
agreed:- 
(1) to adopt the scheme of polling districts and polling places as detailed in
Appendix 1 to the report; 
(2) to authorise the Returning Officer to identify suitable alternative polling places
in advance of any given election should that polling place no longer be
available to the Council, as outlined in Appendix 1 to the report; and 
(3) to authorise the Returning Officer to determine a suitable polling place for
those voters in the Glasgow City Council area, who will form part of the new
UK Parliamentary Constituency of West Dunbartonshire.
Page 18

Page 19

GLASGOW CITY REGION CITY DEAL UPDATE AND EXXON SITE PROJECT
A report was submitted by the Chief Officer – Regulatory and Regeneration seeking
approval for the construction agreements with Balfour Beatty Civil Engineering Ltd
and Network Rail for the Exxon site infrastructure project, and advising of the
progress being made on delivering the projects, and the implementation of the
Glasgow City Region programme.
After discussion and having heard the Chief Officer – Regulatory and Regeneration
in further explanation and in answer to Members’ questions, the Council agreed:-
(1) to delegate authority to the Chief Officer – Regulatory and Regeneration to
agree the construction agreements with Balfour Beatty Civil Engineering Ltd
and Network Rail and such ancillary agreements as may be required to
deliver the works, all in line with the approved budget;
(2) to note the progress made on site remediation made by ExxonMobil, and the
new target completion date of the end of February 2024;
(3) to note the progress made with Network Rail on possession of the site for
construction of the western underpass;
(4) to note that the outcome of the Council’s additional funding request to
Glasgow City Region was not yet known; and
(5) to note the progress of the Glasgow City Region programme.
FINANCIAL UPDATE
(a) Deputation – Cuts to Services
Having heard Provost McAllister, the Council noted that a request had been
received from UNISON and EIS to address the Council in relation to ‘Cuts to
Services’.
The Council agreed to hear the deputations and the Provost then invited the
delegation, namely David Smith, UNISON, and Jim Halfpenny, EIS, to come
forward and address the Council, and Mr Smith and Mr Halfpenny were heard
in relation to their concerns regarding cuts to services.
The Provost thanked the Representatives for their contributions.
(b) Report by Chief Officer – Resources
A report was submitted by the Chief Officer – Resources providing an update
on the financial challenges facing the Council, the estimated 2024/25 –
2028/29 revenue budget gaps and presenting the first tranche of saving
Page 19

Page 20

options for Members’ consideration to help the Council deliver a balanced
2024/25 budget.
After discussion and having heard the Chief Executive and the Chief Officer –
Resources in further explanation and in answer to Members’ questions, 
Councillor Rooney, seconded by Councillor McGinty, moved:-
Council thanks the Chief Officer for the Financial Update and for taking the
time to go through the report and for responding to questions and comments
from Elected Members. 
Council agrees the following:-
(1) to note the Council’s estimated 2024/25 revenue gap had decreased
from £17.274m down to £16.970m.
(2) to approve the smoothing of the financial benefit from the reduction in
the Councils employer contribution rate to the Strathclyde Pension
Fund over a four year period.
(3) to note the £973,000 of management adjustments which will contribute
to agreeing a balanced 2024/25 budget and assist with future projected
budget gaps.
(4) to approve the following savings proposals totalling £1.356 million.
• CCF01 – WDLT Management fee reduction of 20% (£940,000)
• EDU08 – Additional Management Time in Schools
(£304,000 saving year 1)
• EDU11 – Option 1 DMR Reduction of 10% (£80,000)
• RES07 – Option 2 Two Week Christmas Closedown (£7,000)
• RR03 – Option 1 Retain Hybrid Meetings (£20,500)
The combined savings from Political Savings of £1,351,500, Management
Adjustments of £973,000 means a total saving of £2,324,500 and, when you
factor in the £5.332m from the 4 year smoothing of the financial benefit from
the reduction in the Councils employer pension contribution rate this reduces
the forecast budget gap to £9.313m. 
The above is subject to confirmation of the Council’s final settlement from the
Scottish Government.
As an amendment, Councillor Dickson seconded by Councillor McColl, moved:-
Council notes the management adjustments and officers' reassurance that
there will be no compulsory redundancies and no impact on services as a
result of the Chief Executive's decision to make these budget adjustments.
Council further agrees that given the scale of the current financial challenge,
the savings options in the report will be considered in concert with all of the
Page 20

Page 21

savings options being presented to Council at the budget setting meeting in
March 2024.
On a roll call vote being taken, 9 Members voted for the amendment, namely
Dickson, Docherty, McColl, McElhill, Councillors Murray Conaghan, Oxley, Pollock,
Scanlan and Traynor, and 12 Members voted for the motion, namely Provost
McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty, McKay, Millar,
O’Neill, Rooney, Sorrell and Steel.  One Member abstained from voting, namely
Councillor Bollan. The motion was declared carried.
Councillor Bollan, having failed to find a seconder for a proposed second
amendment asked for his dissent to be recorded in respect of this item.
GENERAL SERVICES BUDGETARY CONTROL REPORT TO 31 OCTOBER 2023
(PERIOD 7)
A report was submitted by the Chief Officer – Resources providing an update on the
General Services revenue budget and the approved capital programme to 31
October 2023.
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:-
(1) to note a current projected annual adverse variance on the revenue account
of £2.785m (1.0% of total budget); and
(2) to note that projected expenditure on the capital account was lower than the
2023/24 budget by £36.365m (39.85% of budget), made up of £35.988m
(39.43% of budget) of project re-profiling, and an in-year underspend of
£0.377m (0.41% of budget).
HOUSING REVENUE ACCOUNT BUDGETARY CONTROL REPORT TO 31
OCTOBER 2023 (PERIOD 7)
A report was submitted by the Chief Officer – Resources providing members with an
update on the financial performance to 31 October 2023 (Period 7) of the HRA
revenue and capital budgets for 2023/24.
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:-
(1) to note the revenue analysis showed projected adverse variances of £3.371m.
However this would be offset by removing the £1.729m budgeted contribution
from revenue to capital (CFCR) and using £1.642m of the HRA reserves
resulting in a net revenue break even position; and
(2) to note the net projected annual position in relation to the capital plan was
highlighting an in-year adverse variance of £61.826m (49.5%) which was
Page 21

Page 22

made up of re-profiling of £66.481m (53.2%) and overspend of £4.656m
(0.4%) as appended to the report. 
LONG TERM FINANCIAL STRATEGY 
A report was submitted by the Chief Officer – Resources updating the Council’s long
term financial strategy which was last updated in October 2021. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed to endorse the
medium to long term financial strategy for the Council and approve the Council’s
reserves and balances policy detailed in Appendix 1 to the report. 
VARIATION IN ORDER OF BUSINESS 
After hearing Provost McAllister, the Council agreed to vary the order of 
business as hereinafter minuted. 
TREASURY MANAGEMENT ANNUAL REPORT 2022/23 
A report was submitted by the Chief Officer – Resources providing an update on
Treasury Management during 2022/23. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:- 
(1) to note the Treasury Management Annual Report which formed Appendix 1 to
the report; and 
(2) to note that the Treasury Management Annual Report had been presented to
the Audit Committee on 13 December 2023. 
TREASURY MANAGEMENT MID-YEAR REPORT 2023/24 
A report was submitted by the Chief Officer – Resources providing an update on
Treasury Management to 30 September 2023. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:- 
(1) to note the treasury management stewardship information within Appendix 1
to the report; 
(2) to approve the 2023/24 revised estimates of treasury and prudential indicators
as advised within Appendix 1 to the report (Tables A, B, C, D, E, F, H, L and
N); and
Page 22

Page 23

(3) to note that Appendix 1 to the report had been referred to the Audit
Committee for further scrutiny on 13 December 2023.
NON-DOMESTIC RATES EMPTY PROPERTY RELIEF POLICY
A report was submitted by the Chief Officer – Resources seeking approval of the
amended West Dunbartonshire Council Non-Domestic Rates Empty Property Relief
Policy.
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:-
(1) to approve the amended West Dunbartonshire Council Empty Property Relief
Policy; and
(2) that a review of the new Empty Property Relief Policy be carried out by 31
March 2025 and presented to the Council.
EXTERNAL AUDIT REPORT: ‘BEST VALUE THEMATIC WORK IN WEST
DUNBARTONSHIRE COUNCIL 2022/23’
A report was submitted by the Chief Executive advising of the outcome of the
External Auditor’s Best Value Thematic Review for 2022/23 and providing a
summary of the key points arising.
After discussion, and having heard the Audit Director, Mazars, in explanation of the
report, the Council agreed to note the contents of the report and the external audit
report which formed Appendix 1 to the report.
WEST DUNBARTONSHIRE HSCP ANNUAL PERFORMANCE REPORT 2022/23
A report was submitted by the Head of Strategy and Transformation, West
Dunbartonshire Health and Social Care Partnership (HSCP) providing an overview of
the HSCPs performance in planning and carrying out integrated functions, including
a complaints management overview for the year 2022/23.
After discussion, the Council agreed to note the West Dunbartonshire HSCP Annual
Performance Report 2022/23 and the Annual Complaints Report 2022/23.
COUNCIL TAX CHARGES FOR SECOND HOMES
A report was submitted by the Chief Officer – Resources seeking approval to apply a
100% increased charge on second homes from 1 April 2024.
After discussion and having heard the Chief Officer – Resources, in further
explanation and in answer to Members’ questions, the Council agreed:-
Page 23

Page 24

(1) to approve the increased 100% charge to second homes from 1 April 2024 as
per the Council Tax (Variation for Unoccupied Dwellings) (Scotland)
Amendment Regulations 2023;
(2) to note that a grace period had been introduced to protect new purchasers
from the 100% Council Tax levy for long-empty properties. This applies where
the property is undergoing repairs or renovations and the property had been
purchased by the person liable to pay the Council Tax less than 6 months ago
or such longer period as may be agreed by the local authority; and
(3) to approve the criteria that the property needs to have been purchased by the
person liable to pay the Council Tax less than 6 months ago is not extended
to a longer period.
NOTICE OF MOTION
(a) Motion by Councillor Sophie Traynor – Adoption Leave Policy
Councillor Traynor moved:-
Council recognises the importance of the role that adoptive parents play
within West Dunbartonshire. 
Very few of the children and young people being placed for adoption come
from uncomplicated backgrounds. Local authorities have a duty to provide
adequate support to adopters to ensure the best possible outcome for both
the parents and the young people involved. 
As a Council we should be leading the way on this and ensuring we are doing
everything possible to make this easier for them. 
Council notes that aspects of the current Adoption Leave Policy for
employees is not sufficient enough for prospective adopters. 
Therefore, Council requests that a report be brought forward to assess the
options we can take to make it easier for West Dunbartonshire Council
employees during the adoption process.
As an amendment, Councillor McGinty, seconded by Councillor Sorrell, moved:-
West Dunbartonshire Council’s policies, and our provisions are in line with
those offered across local government. 
The Council’s Adoption, Fostering and Surrogacy Policy was agreed and
implemented in August 2019. This was originally the Adoption Leave Policy
until the introduction of fostering and surrogacy guidance. 
The policy covers leave and pay entitlements, with the pay element linked to a
minimum 26 weeks’ continuous local government service. 
Page 24

Page 25

Employees can access up to 52 weeks’ leave, which comprises a mix of
ordinary and additional adoption leave (like the maternity leave
arrangements).
Employees are paid on the understanding that they will return to work for at
least 3 months. If not, the period must be repaid (like the maternity
arrangements). 
Notification should usually be within 7 days of the employee being notified of
their match, where possible. There are additional requirements where the
child is coming from overseas. 
There is provision for paid leave for pre-adoption meetings for the primary
adopter, with unpaid leave available for the partner. As with maternity, there is
provision for up to 10 keeping in touch (KIT) days at normal pay and without
ending the adoption leave period. 
Employees have the right to return to their job, in same capacity and in the
same place as held prior to commencement of adoption leave. Employees
may elect to return to work earlier than envisaged with relevant notice. 
Council agrees that a briefing note with links to the associated policy and
procedures should be issued to all elected members.
On a roll call vote being taken, 12 Members voted for the amendment namely
Provost McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty,
McKay, Millar, O’Neill, Rooney, Sorrell and Steel, and 10 Members voted for the
motion, namely Councillors Bollan, Dickson, Docherty, McColl, McElhill, Murray
Conaghan, Oxley, Pollock, Scanlan and Traynor.  The amendment was accordingly
declared carried.
(b) Motion by Councillor Ian Dickson – Substandard road A813 between
Lionsgate Roundabout and Strathleven Drive
Councillor Dickson moved:-
Council recognises that the A813, between Lionsgate Roundabout, and
Strathleven Drive in its current condition is second-rate. Despite regular
patching and resurfacing work, the gutter area of the road is often visibly
subsiding and crumbling. 
In parts, the pavement is barely a couple of feet wide, such that a wheelchair
user, a cyclist, or someone pushing a pram would find they hang out into the
40 mph A-road. 
This section of road is unlit, and in the shadow of mature trees, intensifying
the already severe risk to life should there be a collision between traffic on this
narrow road and a pedestrian or a cyclist. 
Page 25

Page 26

This pavement is the only realistic walking route to access OLSP High School
in Bellsmyre from Bonhill.
Council notes there were plans until recently to widen this dangerous stretch
of road and to optimally upgrade the current sliver of pavement to a full three
metre wide shared footway and cycle path. Given the current dangers posed
to vulnerable road users. 
Council asks that this project be put back into the capital plan as close to its
original delivery timescales as possible.  Costs associated with this should be
included in the budget report and capital plans that will be presented to
elected members at the 2024/25 budget setting meeting.
As an amendment, Councillor McBride, seconded by Councillor O’Neill, moved:-
Council notes that phase 1 of the A813 project involves the section between
Lionsgate Roundabout and Lomond Gate Roundabout. The remaining Phase
1 element includes the installation of a 3m wide footpath with associated
lighting. 
The Roads Service has undertaken the detailed design for this element and
final land acquisition is underway to facilitate the works. The construction is
due to commence on site in Spring 2024. The budget for Phase 1 is
£1.7million with spend to date £1.2million. 
Phase 2 is the section from Lionsgate Roundabout and will tie into the existing
footways at the boundary of Bonhill. This section is approximately 1km in
length. The works require land acquisition to construct a 3m wide footpath
with lighting alongside any retention and road geometry measures to
accommodate the new footway. 
The anticipated budget for Phase 2, originally to be delivered in 2025/26, was
£2.325 million however due to inflation in costs of materials this is likely to
increase. This will not be known until design complete. 
Council also notes that the current budget available to the Roads Service will
facilitate the detailed design of Phase 2 and this will shape a capital bid that
can be presented to Elected Members for consideration.  It is anticipated
design will be complete in December 2024. 
Given the above, the Council agrees to continue with Phase 1 works until
completion following commencement in Spring 2024. In addition, following the
completion of Phase 2 design works, the A813 project Phase 2 to be
assessed for inclusion in the Capital Programme for financial year 25/26
onwards. 
Furthermore, the Councils Road Service In addition, should explore external
funding opportunities such as Sustrans Funding and Cycling, Walking, Safer
Routes Funding.
Page 26

Page 27

On a roll call vote being taken, 12 Members voted for the amendment, namely
Provost McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty,
McKay, Millar, O’Neill, Rooney, Sorrell and Steel, and 10 Members voted for the
motion, namely Councillors Bollan, Dickson, Docherty, McColl, McElhill, Murray
Conaghan, Oxley, Pollock, Scanlan and Traynor.  The amendment was accordingly
declared carried.
(c) Motion by Councillor Ian Dickson – Mandatory 20 MPH speed limits near
schools
Councillor Dickson moved:-
Council notes that the safety of children and young people travelling to, from
and around our schools and early education centres is an issue that concerns
everyone.
West Dunbartonshire Council encourages active travel options, such as
cycling and walking, and so road safety in the vicinity of schools should be of
utmost importance.
With this in mind, and the well-understood link between vehicle speed and the
severity of injury and survivability, Council reaffirms its commitment to enact
mandatory 20mph speed limits at our education campuses, in line with
existing and emerging regulation and guidance, and with a particular focus on
new campus locations, such as those on Howatshaws Road in Bellsmyre.
Costs associated with this should be included in the budget report and capital
plans that will be presented to elected members at the 2024/25 budget setting
meeting, with associated works commencing as soon as possible in the
2024/25 financial year.
As an amendment, Councillor McBride, seconded by Councillor O’Neill, moved:-
Council agrees that the safety of pedestrians including children and young
people travelling to and from school is of paramount importance.
Council notes that over the years there has been a significant investment in
road safety in our communities and around our schools. 
The introduction of road safety arrangements at our schools can be a fairly
involved process which requires an assessment of the current arrangements,
the development of potential options, the analysis of the options, the road
geometry, speed surveys, and consultation with Police Scotland. 
This process helps to inform the different needs and the potential costs
including the introduction of hard measures such as speed cushions, humps
and chicanes to help to limit vehicle speed. 
In addition there would need to be appropriate consultation at a suitable
times, that allows residents, businesses and others an opportunity provide
comment or objections.  
Page 27

Page 28

It should be noted that the Traffic Regulation Order (TRO) process can take in
the region of 12/18 months depending on whether objections are received and
maintained. 
Given the above, this Council agrees that the Roads Service will undertake a
review of speed limits at all schools. This will cost in the region of £10k and
importantly will help to determine the capital investment budget required to
deliver the planned investment. 
Council also agrees that following the completion of the necessary works that
project costs are presented to elected members for consideration and for
inclusion in the Councils Capital Programme. 
On a roll call vote being taken, 12 Members voted for the amendment, namely
Provost McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty,
McKay, Millar, O’Neill, Rooney, Sorrell and Steel, and 10 Members voted for the
motion, namely Councillors Bollan, Dickson, Docherty, McColl, McElhill, Murray
Conaghan, Oxley, Pollock, Scanlan and Traynor.  The amendment was accordingly
declared carried. 
(d) Motion by Councillor Ian Dickson – Stopping the stink in the Vale of
Leven. 
Councillor Dickson moved:- 
Council notes that on 12th October 2022, the Planning Committee heard
application DC20/253 – A request to extend the time of the approved
landfilling operation by 15 years at Auchencarroch Landfill Site, in Jamestown,
Balloch.  The extension was only granted until June 30th 2024, not the 15
years originally requested by Barr Environmental.   
With annual hikes in landfill tax and long-standing Scottish Government zero
waste targets focused on waste reduction, re-use, enhanced recycling, and
recovering renewable energy from what remains, this Council should be
making progress towards a nearly zero-landfill option.  Councils across the
country were tasked with a commitment to send only 5% of waste to landfill by
2025.  Regretfully, this Council appears to be well away from meeting this
aspiration.   
With all of our residual waste being landfilled at Auchencarroch, as well as
that of neighbouring authorities, West Dunbartonshire Council urgently
requires alternative options to landfill.   
Given that it is currently only permitted to operate for just over 6 months,
Council urgently requests a report, detailing alternative options for disposing
of West Dunbartonshire’s residual waste.  Of particular interest are
opportunities for meeting the energy reclamation element of the waste cycle
for materials that cannot be reused or recycled, as we have nothing in place
at present.
Page 28

Page 29

As an amendment, Councillor McBride, seconded by Councillor Sorrell, moved:-
West Dunbartonshire Council notes that the Landfill Site at Auchencarroch is
owned and managed by Barr Environmental Limited.  At present, Waste Service
has contracts for:
(i) Residual Waste, this contract terminates on 31 December 2023 and an
interim solution is in place for residual waste from 1 January to facilitate
a longer term solution to be put in place.
(ii) Bulky Waste disposal with BEL however, this contracts also terminates
on 31 December 2023 - At present a tender exercise is concluding for
Bulky Waste
In addition, the Council has recently received an application from Barr
Environmental Limited to extend the time of landfilling operations at
Auchencarroch until 30th June 2026 and until 30th June 2028 for restoration with
an updated site restoration plan. The application will be presented to a future
Planning Committee in 2024 for consideration.
Council notes that the under the previous SNP Administration, the Council
recycling reduced and we failed to meet national targets. In fact, recycling rates
decreased from 49% in 2016/17; to 37% in 2021/22. The percentage has
increased slightly to 38% for 2022/23 and we anticipate a continued increase in
recycling performance. 
The Labour Administration has set a course to improve our management of
waste. In August 2023, the Council adopted a new 5 year Waste Strategy, which
sets out a clear route map, to support our transition to net zero.  
The strategy aims include:
• To increase access to recycling services,
• To increase the range of materials collected for recycling; and
• To monitor and maximise participation in waste prevention, reuse and
recycling through behavioural change.
The new 5 year Waste Strategy Action Plan includes a delivery programme of
actions and key milestones:
• To implement a new collection regime which prioritises recycling waste
collection, (2 weeks recycling 1 week residual);
• To construct a Resource, Reuse and Recycle Centre (Waste Transfer Station)
in Dumbarton);
• To develop a Communications and Engagement Strategy; and
Page 29

Page 30

• To procure a long term waste disposal solution for residual waste.
This Council thanks the Chief Officer and her staff for all the work undertaken to
identify a long term solution for the management of residual waste to ensure the
Council is compliant with the December 2025 landfill ban.
The Chief Officer, is requested to bring forward a report to a future IRED meeting
at the earliest opportunity.
On a roll call vote being taken, 12 Members voted for the amendment, namely
Provost McAllister and Councillors Edward, Johal, Lennie, McBride, McGinty,
McKay, Millar, O’Neill, Rooney, Sorrell and Steel, and 10 Members voted for the
motion, namely Councillors Bollan, Dickson, Docherty, McColl, McElhill, Murray
Conaghan, Oxley, Pollock, Scanlan and Traynor.  The amendment was accordingly
declared carried.
COMPLIMENTS OF THE SEASON
Before closing the meeting, Provost McAllister wished everyone a very Merry
Christmas.
The meeting closed at 7.40 p.m.
Page 30

Page 31

WEST DUNBARTONSHIRE COUNCIL
At a Hybrid Meeting of West Dunbartonshire Council held in the Civic Space, 16
Church Street, Dumbarton on Wednesday, 6 March 2024 at 4.06 p.m.
Present: Provost Douglas McAllister and Councillors Jim Bollan, Ian
Dickson, Diane Docherty, Gurpreet Singh Johal, Daniel Lennie,
David McBride, Jonathan McColl, Michelle McGinty, June
McKay, John Millar, Karen Murray Conaghan, Lawrence O’Neill,
Lauren Oxley, Chris Pollock, Martin Rooney, Gordon Scanlan,
Hazel Sorrell, Clare Steel and Sophie Traynor.
Attending: Peter Hessett, Chief Executive; Alan Douglas, Chief Officer –
Regulatory and Regeneration (Legal Officer); Laurence Slavin,
Chief Officer – Resources, and Section 95 Officer; Peter Barry,
Chief Officer – Housing and Employability; Amanda Graham,
Chief Officer – Citizen, Culture and Facilities; Gail Macfarlane,
Chief Officer – Roads and Neighbourhood; Laura Mason, Chief
Officer – Education; Beth Culshaw, Chief Officer – Health &
Social Care Partnership; Victoria Rogers – Chief Officer, People
and Technology; Michelle Lynn, Assets Co-ordinator; Alan
Stewart, Housing Asset and Investment Manager; John Kerr,
Housing Development and Homeless Manager; Carol Alderson,
Finance Manager; Michael McDougall, Manager of Legal
Services; George Hawthorn, Manager of Democratic and
Registration Services; and Carol-Ann Burns, Senior Democratic
Services Officer.
Apologies: Apologies for absence were intimated on behalf of Councillors
Craig Edward and James McEhill.
Provost Douglas McAllister in the Chair
STATEMENT BY CHAIR
Provost McAllister advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback.
REQUEST FOR DEPUTATION – JOINT TRADES UNION
The Provost advised that a late request had been received to hear a deputation from
GMB, Unite, Unison and EiS in relation to the item ‘General Services Budget Setting
2025/26 and 2028/29 - 2027/28 Budget Estimates’.
ITEM 5(b)
Page 31

Page 32

Having heard the Provost, the Council agreed to suspend Standing Orders 18 (b)
and (e) in order to allow the deputation which, the Provost advised, would be taken
immediately prior to the aforementioned item of business.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
RECORDING OF VOTES
The Council agreed that all votes taken during the meeting would be done by roll call
vote to ensure an accurate record.
OPEN FORUM
The Provost advised that an Open Forum question had been received from Ms Amy
Unitt.  It was noted that Ms. Unitt was not in attendance to address Council.  Having
heard the Legal Officer Council agreed that a written response would be provided to
Ms. Unitt.
DEPUTATION – JOINT TRADES UNION
The Provost invited the delegation, namely Mr Mick Dolan (EiS), Mr Norman King
(Unite the Union), Mr David Scott (GMB), and David Smith (UNISON) forward to join
the meeting, and each was heard in relation to their concerns regarding potential
budget cuts.
The Provost thanked the Representatives for their contributions and invited them to
remain in the meeting for its duration.
GENERAL SERVICES BUDGET SETTING 2024/25 AND 2025/26 TO 2028/29
BUDGET ESTIMATES
A report was submitted by the Chief Officer – Resources:-
(a) summarisng the key issues relating to the revenue budget estimates and
setting of Council Tax for 2024/25 and providing budget estimates for 2025/26
to 2028/29;
(b) advising of the mid-range estimates, with the best case and worst case
estimates summarised in paragraph 4.14.1 of the report; and
Page 32

Page 33

(c) seeking approval to set the General Services Revenue and Capital Budgets
for 2024/25 through approval of options to close the 2024/25 revenue budget
gap.
It was noted that a revised version of Reducing the Occupational Health Budget -
saving option PT10, page 67 of the papers had been circulated to Members
immediately prior to the meeting.
After discussion and having heard the Chief Officer – Resources, in further
explanation and in answer to Members’ questions. 
Councillor Rooney moved:-
Council thanks the Chief Executive and the Chief Officer of Resources for the
detailed report at item 6 comprising a comprehensive covering report and
appendices. Council also thanks the Chief Officer of Resources for the verbal
update following any changes to the budget gap and the report. This report
shows the level of work that has gone into the budget setting process this
year. 
This is the most challenging financial period in the Council’s history and with
the cost of living crisis impacting on ever increasing numbers of our residents,
we are acutely aware of the need to protect services and jobs for local people.
The funding gap may be lower than this time last year but rapidly reducing
budgets every year mean the options available to us to continue to provide
services in the same way are becoming more and more limited. 
The pressures this Council is facing are a direct result of sustained cuts to its
revenue funding since 2007. This has cumulatively amounted to over
£30million of recurring savings having to be made in our area over the period,
as well as the near exhaustion of the Council’s reserves.
The Scottish Government’s claim that a Council Tax freeze helps the least
well off is simply not credible. In addition, its claim that the Council Tax freeze
is fully funded is false. 
This extreme financial landscape, coupled with the ever increasing lack of
flexibility for councils due to Scottish Government interference in democratic
decision making, results in very limited choices in how councils deliver
services.  This will inevitably impact on the provision of vital community
services.
Council regrettably agrees that the Scottish Government in power since 2007
has demonstrated contempt for local government in Scotland. It seems to
have entirely given up on any pretence of partnership working or recognition
of councils’ legitimate authority to make decisions on services they deliver on
behalf of valued local communities. Their stated commitment to the Verity
House Agreement has no credibility and emphasises their disdain for local
democracy and the communities that councillors are elected to represent.  
Page 33

Page 34

Council agrees that the Scottish Government has specifically acted against
the interests of West Dunbartonshire by amending the floor mechanism in the
distribution which results in a less well-off Council like West Dunbartonshire
losing out. As a result of the actions of the Scottish Government, West
Dunbartonshire Council has required to identify an extra £1.7m of savings.
This continued ill-considered approach by the Scottish Government to
centralise decision making and impose spending restrictions poses a very real
threat to the continued ability of the Council to maintain the range of high-
quality services our communities need. Despite this unhelpful political and
financial context, the Council is still legally required to set a balanced budget. 
Given the above the Council agrees:
(1) to retain the full amount of Scottish Government funding for pay to help
protect local services. As at 31st March 2024, the HSCP will have
£2.454m of un-earmarked reserves; and £15.451m of earmarked
reserves. In addition, it will benefit over the next three years from a
reduction in employers contribution to SPF and can use these to
support their budget.
(2) to note the management adjustments set out in Appendix 3 to the
report will be used to set the General Services revenue budget for
2024/25 and assist with future projected budget gaps.
(3) that the Council Tax will be frozen for financial year 2024/25. This
means that the Band D Council Tax rate will remain at £1,398.98.
(4) the proposed updated capital plan as set out in Appendix 5 to the report
from 2024/25.
(5) to approve the 2024/25 West Dunbartonshire Leisure Trust
management Fee of £3,658,373.
(6) to note the Council had already committed £5.332m of reserves at the
December Council.
(7) the additional use of reserves to help balance the 2024/25 budget as
follows:
a. Permanent use of reserves of £934,000.
b. Temporary use of reserves £3.077 million.
(8) a report will be brought to Council in June to provide an update on the
£62.7m of additional funding to be distributed to local government and
for options to replenish the Council’s reserves.
Page 34

Page 35

(9) the Administration’s savings, growth items and other measures to close
the budget gap as appended to this motion (shown as Appendix 1 to
these Minutes).
(10) to note that option RN06 relating to Bowling Club savings will not be
taken for 2024/25, but agree Council Officers will work with the bowling
clubs to assess how best to support their long term future as some
clubs have very few members and significant running costs.
(11) EDU05: The introduction of the Early Start Clubs, costs will be reduced
from those proposed to a charge of £2 per session for pupils not
entitled to free school meals and to abolish the charge for those pupils
who are entitled to free school meals.  The Education Service will
consult with service users on fee rates including any possible variation
for siblings.
(12) EDU09: The proposal was to close St Eunan’s and Linnvale Out of
School Care services due to low usage. However, feedback suggests
that parents really value the service and would be willing to pay more to
retain it. Therefore, the fees will increase by £3 per session from April
2024. Thereafter for 2025/26 the fees will increase to cover the cost of
the service.
(13) the underfunding of Local Government is unlikely to change over the
next three years and all community organisations, whether impacted by
savings or not, should be are aware of the Council’s expected financial
challenges. It would be prudent for them to proactively explore
alternative funding sources to help ensure their future sustainability.
(14) to note the Council has established four new funds designed to support
communities and help those community organisations affected by
changes to their funding. These include:
a. A £250,000 Community Success Revenue Fund;
b. A £100,000 Youth Success Revenue Fund;
c. A £150,000 Community Success Capital Fund; and
d. A £250,000 Community Sports Success Capital Fund
(15) in terms of the additional increase to sales, fees and charges, this will
apply to all services with the exception of School Meals which will have
the 4% applied that was agreed at Council in December.
At this point in the meeting Councillor Dickson, McColl, Scanlan and Docherty each
requested an adjournment of the meeting to allow consideration of the motion.  The
Provost declined the request.
As an amendment, Councillor Dickson moved:-
Council agrees the recommendations at 2.1 of the report, subject to the
following provisions. 
Page 35

Page 36

Council agrees to freeze Council Tax and accept the Scottish Government’s
£2.219m of funding to do so. This funding, which has been baselined for
future years and is recurring in terms of our budget gap projections, offsets a
potential Council Tax rise of more than 5%; this Council Tax freeze is fully
funded this year and going forward into future years. 
Council notes the £8.366m budget gap and agrees the £1.719m growth items
alongside political decisions to balance the budget appended to this motion
(shown as Appendix 2 to these Minutes).
Westminster policies designed to benefit London and the Southeast of
England continue to damage the wider economy, and it is our citizens who are
suffering. 
As a Council we have a moral obligation to do everything we can to protect
public services and make things easier for people in the face of the cost of
living, or more accurately the cost of the union crisis. 
To that end, this SNP budget includes no cuts to services and no
redundancies. 
The SNP budget also provides £403k for an in-year community investment
fund. The purpose of this fund is twofold. 
Firstly, it provides free reserves for the Council to spend on activities that will
benefit our communities. Councillors and Officers bring proposals to Council
and Committee through motions or reports throughout the year, and this
funding will be available to assist in delivering these policy proposals. 
Secondly, it will allow the Council to slow down the current rush to transfer or
lease community facilities and enable a more open and transparent process
to be developed. 
To this end, Council asks that a report be brought to a future Council or IRED
Committee for the purpose of: 
• Outlining the current process being followed for leasing/community
asset transfer.
• Proposing changes to the process to facilitate proper discussions with
current users of facilities prior to bringing reports to committee for
agreement.
• Proposing any further changes that can make the process more
transparent and provide Councillors with the information we require to
make informed decisions.
In agreeing this 2024/25 budget, Council notes that we are reducing the
projected 2025/26 budget gap by £3.961m and the 2026/27 budget gap by
£4.011m. 
Page 36

Page 37

At this point in the meeting, Councillor Rooney’s motion was seconded by Councillor
McGinty and Councillor Dickson’s amendment was seconded by Councillor Scanlan.
On a roll call vote being taken 8 Members voted for the amendment, namely
Councillors Dickson, Docherty, McColl, Murray Conaghan, Oxley, Pollock, Scanlan
and Traynor, and 11 Members voted for the motion, namely Provost McAllister and
Councillors Johal, Lennie, McBride, McGinty, McKay, Millar, O’Neill, Rooney, Sorrell
and Steel.  The motion was accordingly declared carried. One Member abstained
from voting, namely Councillor Bollan. The motion was declared carried.
Councillor Bollan, having failed to find a seconder for a proposed second
amendment asked for his dissent to be recorded in respect of this item.
CAPITAL STRATEGY 2024/25 TO 2032/33
A report was submitted by the Chief Officer – Resources providing an updated
Capital Strategy for the period 2024/25 to 2032/33 and seeking its approval.
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed to approve
West Dunbartonshire Council’s updated capital strategy for the period 2024/25 to
2032/33.
Note: Councillor McKay left the meeting at this point.
HOUSING REVENUE ACCOUNT (HRA) CAPITAL INVESTMENT PROGRAMME,
REVENUE BUDGET, AND RENT LEVELS FOR 2024/25
A report was submitted by Chief Officer – Housing and Employability:-
(a) seeking approval of the proposed HRA Capital Investment Programme and
the HRA Revenue Budget for 2024/25; and
(b) seeking agreement of the level of weekly rent increase for 2024/25.
After discussion and having heard the Chief Officer – Housing and Employability in
further explanation and in answer to Members’ questions, Council agreed. 
(1) to note the progress made in the HRA capital programme for 2023/24
as detailed in Appendix 1 to the report;
(2) to approve the HRA Capital Investment Plan 2024/25 – 2028/29 as
detailed in Appendix 2 to the report;
(3) to approve the HRA revenue budget for 2024/25 as detailed in
Appendices 3 and 4 to the report;
Page 37

Page 38

(4) to approve a 6.7% weekly house rent increase for 2024/25 at an
average £5.94 on a 52-week basis (£6.58 on a 47-week basis)
inclusive of homes used as emergency homeless temporary
accommodation; 
(5) to a approve a 6.7% weekly Gypsy Travellers site rent increase,
increasing pitch rent by £5.37 to £85.46 on a 52-week basis (£5.94 to
£94.55 per week on a 47-week basis); 
(6) to approve a 6.7% lock up rent increase, increasing rent by £0.38 to
£6.04 per week on a 52-week basis (£0.42 on a 47-week basis to
£6.68); 
(7) to note the outcome of the tenant consultation process as detailed in
Appendix 5 to the report ; 
(8) to note the increase in the prudential reserve target for 2024/25 (from
£0.984m to £1.064m); 
(9) to note that the HRA continues to face considerable cost pressures and
that the latest forecast is for HRA to draw reserves of £2.140m to
balance the 2023/24 revenue budget with closing reserves forecast at
circa £0.500m; and 
(10) to note that work will continue in 2023/24 and 2024/25 to identify and
deliver further general efficiencies across all areas of the housing
budget that will allow reserves to be replenished and maintained in line
with the prudential target (as detailed in Appendix 3 to these Minutes). 
DUMBARTON COMMON GOOD BUDGET UPDATE 2024/25 
A report were submitted by the Chief Officer – Resources:- 
(a) providing an update on the 2023/24 Dumbarton Common Good budget; and 
(b) seeking approval for a revised 2024/25 budget and indicative budgets for
2025/26 and 2026/27. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:- 
(1) to note the Dumbarton Common Good 2023/24 outturn is currently
projected to be a deficit of £126,791; 
(2) to approve the indicative 2024/25 budget of £455,949 expenditure
against projected income of £322,446 representing a budgeted deficit
of £133,503; 
Page 38

Page 39

(3) to approve the inclusion of a budget of £53,465 in 2023/24 reducing to
£31,494 in 2024/25 to fund ongoing security costs at 7 Overburn Ave;
(4) to note the indicative budgets to 2026/27 as set out in Appendix 1;
(5) to note the projected balances available for carry forward of £498,105
at 31 March 2024 and £364,602 at 31 March 2025 (based upon the
revised draft 2024/25 budget); and
(6) to note that a comprehensive review of the recurring annual grant
awards will be carried out during 2024/25.
The meeting closed at 8.03 p.m.
Page 39

Page 40

Page 40

Page 41

AUDIT COMMITTEE
At a Meeting of the Audit Committee held in the Civic Space, 16 Church Street,
Dumbarton, on Wednesday, 13 December 2023 at 2.00 p.m.
Present: Councillors Ian Dickson, Jonathan McColl and Martin Rooney.
Attending: Peter Hessett, Chief Executive; Laurence Slavin, Chief Officer –
Resources; Amanda Graham, Chief Officer – Citizen, Culture
and Facilities; Julie Slavin, Chief Finance Officer - Health and
Social Care Partnership (HSCP); Andi Priestman, Shared
Service Manager – Audit and Fraud; Stephen Daly, Citizen and
Digital Manager and Lynn Straker, Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Councillors
Karen Murray Conaghan1, James McElhill, Michelle McGinty,
John Millar and Hazel Sorrell, and Lay Member Mr Christopher
Johnstone.
Councillor Jonathan McColl in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
MINUTES OF PREVIOUS MEETINGS
The Minutes of Meetings of the Audit Committee held on 3 May 2023 and 9 August
2023 were submitted and approved as a correct record.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
INTERNAL AUDIT PLAN 2023/24 – PROGRESS TO 15 NOVEMBER 2023
1 As corrected by the Audit Committee at its meeting on 21 February 2024.
ITEM 6
Page 41

Page 42

A report was submitted by Chief Officer – Resources advising of progress at 15
November 2023 against the Internal Audit Plan for 2023/24, of recently issued
Internal Audit reports and action plans and the status of implementation progress in
relation to action plans from previously issued Internal Audit reports.
After discussion and having heard the Shared Service Manager – Audit and Fraud in
further explanation and in answer to Members’ questions, the Committee agreed to
note the contents of the report.
TREASURY MANAGEMENT ANNUAL REPORT 2022/2023
A report was submitted by Chief Officer – Resources advising of the operation of the
treasury function and its activities for 2022/23 and requesting that the report is
remitted to full Council for approval.
After discussion and having heard the Chief Officer - Resources in further
explanation and in answer to Members’ questions, the Committee agreed:-
(1) to note the contents of the annual report on treasury Management for
2022/23; and
(2) to remit the report to the Full Council for approval.
TREASURY MANAGEMENT MID-YEAR REPORT 2023/24
A report was submitted by Chief Officer – Resources advising of the operation of the
treasury function and its activities to 30 September 2023 and requesting that the
report is remitted to full Council for approval.
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Committee agreed:-
(1) to note the treasury management stewardship information within the
appended report;
(2) to note the 2023/24 revised estimates of treasury and prudential indicators as
advised within the appended report (Tables A, B, C, D, E, F, H, L and N); and
(3) to remit the report to the Full Council for approval.
SCOTTISH PUBLIC SERVICES OMBUDSMAN COMPLAINTS REPORT 2022/23
A report was submitted by Chief Officer – Citizen, Culture and Facilities presenting
the Scottish Public Services Ombudsman (SPSO) report on complaints handling by
West Dunbartonshire Council for the year 1 April 2022 – 31 March 2023.
Page 42

Page 43

After discussion and having heard the Citizen and Digital Manager in further
explanation and in answer to Members’ questions, the Committee agreed to note the
contents of the report and the ongoing commitment at a service and strategic level to
monitor complaints and ensure compliance with Scottish Public Services
Ombudsman (SPSO) timelines.
The meeting closed at 2.18 p.m.
Page 43

Page 44

Page 44

Page 45

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Council: 27th March 2024
_____________________________________________________________
DC23/149/FUL: Erection of 128 residential homes, associated roads,
infrastructure and open space on existing brownfield site,
Residential Development Site, Abbotsford Road, Clydebank
by Miller Homes.
1. REASON FOR REPORT
1.1 This report relates to a planning application for a national development and as
the application site sits within the Clyde Mission area as set out in National
Planning Framework 4. There is a statutory requirement for applications of
this nature to be determined by the full Council.
2 RECOMMENDATION
2.1 That the Council approve planning permission subject to the conditions set
out in Section 9 of Appendix 1 report and the additional condition detailed in
Section 4.5 of this report.
3 BACKGROUND
3.1 Planning permission is sought for the construction of one hundred and twenty
eight houses and associated works.   The planning application is a national
development as set out in the Schedule to the Town and Country Planning
(Hierarchy of Developments) (Scotland) Regulations 2009 as the application
site sits within the Clyde Mission area as set out in National Planning
Framework 4. Under the terms of Section 38A of the Town and Country
Planning (Scotland) Act 1997 (as amended), such applications require a pre-
determination hearing, and other legislation requires that such applications be
determined by the full Council.  In accordance with the Council’s procedures,
a pre-determination hearing took place at the Planning Committee on 17th
January 2024.
4 MAIN ISSUES
4.1  A copy of the report presented to the Planning Committee is provided in
Appendix 1.  Sections 6 and 7 of that report set out the planning policies and
other material considerations relevant to the application. The report concludes
that the site is within the defined town centre and whilst not an allocated site
for housing, National Planning Framework 4 encourages vitality and viability
of town centres through town centre living. Subject to the appropriate use of
conditions, the proposed development is acceptable.
ITEM 8
Page 45

Page 46

The layout and design of the development has been developed to ensure that
it integrates with the existing form as well as creating a high quality
development which enhances the local area whilst also taking into
consideration the constraints of the site. The development will provide much
needed housing in a central town centre location with good connections to the
surrounding area and wider green network. 
4.2 The proposal will result in a high quality residential development. It is
acknowledged that whilst contrary to specific aspects of the Development
Plan in respect of the retail development opportunity allocation in the adopted
Local Plan, the aspirations for the site have evolved since this Plan was
prepared. The Clydebank Town Centre Development Framework 2021
identifies the need for residential development within the town centre with the
Playdrome site itself is shown as a residential site within the Priority Phase 1.
The proposed development will deliver this priority. The proposal is not an
allocated residential development opportunity in the Local Development Plan
and thus does not fully accord with the requirements of Policy 16 of NPF4.
However, considering NPF4 as a whole, the proposal is considered to be in
accordance with the spatial aims most notably in respect of Clyde Mission,
redeveloping brownfield sites, contributing to town centre living and 20 minute
neighbourhoods. 
4.3      The proposed redevelopment of this prominent brownfield site within the town 
centre site with one hundred and twenty eight new dwellings in a mix of two,
three and four bedroom homes is welcomed. The proposal will result in a high
quality and permeable development creating positive relationships with
adjacent streets and spaces. The proposed development will also bring
residents into the town centre, supporting the economy of the town centre and
adjacent community uses. 
4.4 At the pre-determination hearing Ms Marie McNair MSP and Ms Fiona 
McInnes the Chief Executive of the Clydebank Co-operative Society
addressed the Committee.  The issues raised at the hearing reflected the
matters covered in Section 5 of the Planning Committee report. A further
email letter from the Clydebank Co-operative Society was circulated to the
Planning Committee members regarding access arrangements during
construction to existing car parks and properties via Abbotsford Road.
Concern by Marie McNair MSP was raised about the loss of parking, breach
of planning policies and the availability of alternative sites. The Clydebank Co-
operative Society whilst welcoming new homes, highlighted the insufficient
parking for new residents that many of their customers relied on the carpark,
potential overspill of long stay parking into their car park and the development
could impact on the viability of the shopping centre. The Applicant, Miller
Homes Ltd, also addressed the Committee and indicated that the site was
deemed to be an acceptable location for a housing site and indicated that they
had worked with adjacent uses such as the Church, Credit Union, Salvation
Army to give additional parking spaces and maintain access during
construction. 
Page 46

Page 47

4.5      The Planning Committee members  heard from  the Planning and Building
Standards and Environmental Health Manager and the Chief Officer – Roads
and Neighbourhoods regarding the available capacity of parking within the
vicinity of the shopping centre and proximity of sustainable and active travel
infrastructure. After discussion  the Planning Committee recommended that
the application be referred to the full Council for determination, expressing the
provisional view that the application should be approved with the conditions
indicated within Section 9 of the Planning Committee Report (Appendix 1) 
and the additional condition  - “That at all times, during the construction of the
development, vehicular and pedestrian access shall remain available via
Abbotsford Road, or any other equivalent access road, to all existing
properties which were, at the time of granting planning permission, accessed
via Abbotsford Road.”
5. People Implications
5.1 There are no personnel issues.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications.
7. Risk Analysis
7.1 No risks have been identified.
8. Equalities Impact Assessment (EIA)
8.1 There is no equalities impact.
9. Environmental Sustainability
9.1 A Strategic Environmental Assessment is not required.
10. Consultation
10.1 Publicity and consultation have been carried out in line with the requirements
of the planning regulations. Three representations have been received and
these are summarised in Section 5 of the Planning Committee report
(Appendix 1).
11. Strategic Assessment
11.1    The proposed development complies with the strategic priorities of the 
Council in particular:
• Our Communities Resilient and Thriving
• Our Environment A Greener Future
• Our Economy Strong and Flourishing
Page 47

Page 48

Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 27th March 2024
___________________________________________________________________ 
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager 
Pamela.Clifford@west-dunbarton.gov.uk                                             
07774428221 
Appendices: Appendix 1 - Planning Committee Report: 17th January
2024 - DC123/203   
Background Papers: None 
Wards Affected:           Ward 6 (Clydebank Waterfront) 
Page 48

Page 49

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 17th January 2024
DC23/149/FUL: Erection of 128 residential homes, associated roads,
infrastructure and open space on existing brownfield site,
Residential Development Site, Abbotsford Road, Clydebank
by Miller Homes.
1. REASON FOR REPORT
1.1 The planning application is a national development as set out in the Schedule
to the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009 as the application site sits within the Clyde Mission area as
set out in National Planning Framework 4. Under the terms of the approved
Scheme of Delegation, it therefore requires to be considered by the Planning
Committee before being determined by the Council. 
2. RECOMMENDATION
2.1 That the Planning Committee hears the applicant and those who have made
representations and refers the application to full Council for determination with
a preliminary recommendation, based on the information considered to date,
that it be approved, subject to the conditions in Section 9 below. 
3. DEVELOPMENT DETAILS
3.1 The application site is located within the town centre of Clydebank, on the site
of the former Playdrome Leisure Centre and car park, and extends to
approximately 3.56 hectares in size. The site’s northern boundary adjoins the
Forth and Clyde Canal which is a scheduled monument. To the east is Argyll
Road and to the south is Chalmers Street with the elevated Helensburgh to
Glasgow railway line beyond. To the west of the site is Abbotsford Road and
the rear of commercial units associated with Alexander Street. The surrounding
uses are predominantly community and retail based, with residential properties
located opposite of Argyll Road. 
3.2 The Playdrome Leisure Centre closed in 2017 and following the opening of a
new Leisure Centre on Queens Quay. Works to demolish the building and clear
the site were completed in early 2022. The majority of the application site now
lays vacant with a mix of hardstanding, hardcore areas that are starting to green
following demolition as well as existing amenity planting throughout the site as
well as around the boundary. The application site also incorporates Abbotsford
Road which remains open together with a car park located to the west of
Abbotsford Road. These spaces are currently used by visitors to facilities
nearby including the Clyde Shopping Centre. 
APPENDIX 1
Page 49

Page 50

The turning area adjacent to the existing Clydebank Waterfront Parish Church
which is accessed via Abbotsford Road is also included in the development site.
3.3 Planning permission is sought for the construction of one hundred and twenty
eight houses and associated works. The development comprises of a range of
dwelling sizes including fourteen, two bedroomed properties, one hundred and
thirteen three bedroom properties and one, four bedroom property. These are
mixed across the site between semi-detached and terraced properties. There
are eight different house types across the mostly flat site which would be a mix
of two and three storey in height. External materials are proposed to comprise
of grey concrete roof tiles, facing bricks together with dark grey uPVC windows
and doors. Each property will feature adjacent parking either within street bays
or parking courts as well as private garden areas. Rear gardens will be defined
by 1800mm high timber slatted fences as well as 800mm timber dividing fue
fences. Boundary fences will also include localised sections of acoustic fencing
to a maximum height of 3 metres. The terraced blocks which spans Chalmers
Street and Argyll Road incorporated a feature corner property in order to allow
the terrace to curve around the corner. These properties will be outward facing
from the site. Along Abbotsford Road, and more briefly along Chalmers Road,
the configuration of the three storey townhouses creates a saw tooth style
arrangement due to the gable facing front elevation. The remainder of the
houses predominately have their principle elevation to the internal roads and
paths of the site. Other design features such a canopies, solar panels and
Juliette balconies are proposed on various house types. 
3.4 There is one existing vehicular access point on Chalmers Street from which it
is proposed to maintain and extend site access from. The access from
Chalmers Street, onto Abbotsford Road also serves an existing car park as well
as access to the rear of commercial properties and this access is retained as
part of the development as is access to the Church. As noted above, each
house is proposed to have its own dedicated parking space meaning one
hundred and twenty eight spaces are provided with an additional twenty two
visitor parking spaces located throughout the development. Three electric
vehicle charging points are proposed to be located within these visitor parking
spaces. Twenty eight further spaces are proposed to be created to serve the
existing properties including the adjacent Credit Union, Salvation Army and
Church of Scotland – Waterfront Parish Church buildings. Internally to the site,
four new roads are to be created as well as an internal car park. There are a
network of new footpaths proposed throughout the site with six pedestrian links
to the wider surrounding area. 
3.5 The proposal features open and amenity green space. This is principally
comprised of a large area of open space which incorporates play provision to
the north of the site and an area of open space within a linear park running
along the western boundary of the site, totalling an area in excess of 6700sqm.
Additionally, the eastern and western boundaries of the site have green strips
between the housing and the boundary which allows for much of the existing
boundary treatment to be retained. Small pockets of green space are also
proposed throughout the internal layout of the site. 
Page 50

Page 51

3.6 In support of the application, the applicant has submitted a range of supporting
documentation and information including a Supporting Statement, NPF4
Assessment, Response to Clyde Mission, Pre-application Consultation Report,
Design and Access Statement, Transport Statement, Travel Plan, Tree Report,
Ecological Constraints Survey, Energy Statement, Statement of Community
Benefit, Noise Impact Assessment, Factoring and Management Proposal and
3rd Party Access Statement.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have no objection to the proposal
in respect of roads and parking, other than the proposed temporary construction
access. No objections on flooding matters.
4.2 West Dunbartonshire Council Environmental Health Service have no objections
subject to conditions relating to an updated report on contaminated land, further
associated contaminated land conditions, an updated Noise Impact
Assessment, construction noise, hours of work, piling, dust control, air quality,
lighting and waste.
4.3 West Dunbartonshire Council Biodiversity Officer has no objections to the
proposed development.
4.4 West Dunbartonshire Council Dept. Of Education and Cultural Services have
no objections to the proposed development based on the capacity and current
roll numbers for high schools and primary schools within the area. 
4.5 Historic Environment Scotland have no objections to the proposed development
but note the need for Scheduled Monument Consent in relation to works located
within the scheduled area of the Forth and Clyde Canal. 
4.6 Glasgow Airport no objections but note that the use of a crane will require
consultation with the airport. 
4.7 Scottish Canals have no objections to the proposed development.
4.8 The Coal Authority have no objections to the proposed development further to
the submitted letter confirming that the thick coal seam outcrop is not expected
to bisect this site, specifically owing to a fault.
4.9 Scottish Water, Scottish Power, Scottish Environmental Protection Agency
(SEPA), Strathclyde Partnership for Transport (SPT) and West of Scotland
Archaeology Service have no objections to the proposed development. 
5. REPRESENTATIONS
5.1 Three representations have been received in connection with the proposed
development which includes objection submitted on behalf of Marie McNair
MSP, the Clydebank Co-operative Society and one member of the public.
Page 51

Page 52

The full details are contained within the planning file and are available for public
viewing. However, the points raised can be summarised as follows:
• The proposal will have a significant negative impact to the local area.
• This application will virtually erode the car parking spaces that remain.
• The proposed development fails to meet the West Dunbartonshire Council
parking standards.
• There will be a loss of 192 spaces including 5 accessible spaces which
service local shops and businesses at the Clydebank Shopping Centre.
• Local businesses which will be impacted are against this proposal as are
those who use this car park and visit Clydebank Shopping Centre for social
activities and essential shopping.
• There will be more limited entry for those who depend on travelling by car
to Clydebank Shopping Centre where business and employment are
already being hit by online and city traders.
• An approval would have an adverse impact on the economic welfare, not
only to Clydebank Shopping Centre, but to the community of Clydebank.
• The removal of the car parking will seriously undermine active travel, as this
facility is used by the public who commute from Clydebank train station for
work and leisure.
5.2 The matters raised above are considered and addressed in Sections 6 and 7
below.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy Framework 4
6.1 Eighteen National Developments have been identified within NPF4. These are
significant developments of national importance that will help deliver the spatial
strategy. NPF4 highlights that National Development status does not grant
planning permission and all relevant consents are required. Clyde Mission is a
national development focused on the Clyde and an area up to 500 metres from
the river edge. One of the aims is to repurpose and reinvigorate brownfield land
and support local living. The site lies partly within the Clyde Mission area and
the proposed development will revitalise a vacant brownfield site within the town
centre and Clyde Mission area. 
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises. Policy 2 also relates to the climate in the form
of climate mitigation and adaptation and states development proposals will be
sited and designed to minimise lifecycle greenhouse gas emissions as far as
possible and development proposals will be sited and designed to adapt to
current and future risks from climate change.
6.3 Policy 3 requires development proposals to contribute to the enhancement of
biodiversity. The policy goes on to set out the requirement for proposals for
national and major development to demonstrate that it will conserve, restore
and enhance biodiversity. 
Page 52

Page 53

Policy 7 addresses the historic environment and supports development
affecting scheduled monuments where direct impacts on the scheduled
monument are avoided, and significant adverse impacts on the integrity of the
setting of a scheduled monument are avoided. 
6.4 As the site has been previously developed, Policy 9 addressing brownfield,
vacant and derelict land applies. Development proposals that will result in the
sustainable reuse of brownfield land including vacant and derelict land and
buildings, whether permanent or temporary, will be supported.
6.5 Policy 13 supports proposals to improve, enhance or provide active travel
infrastructure, public transport infrastructure or multi-modal hubs. This includes
proposals for electric vehicle charging infrastructure. 
6.6 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale as per Policy 14.
Policy 15 relates to local living and 20 minute neighbourhoods. Development
proposal will contribute to local living including, where relevant, 20 minute
neighbourhoods. Consideration will be given to existing settlement pattern, and
the level and quality of interconnectivity of the proposed development with the
surrounding area, including local access to affordable and accessible housing
options, ability to age in place and housing diversity.
6.7 Policy 16 relates to quality homes. Part (b) requires development proposals that
include 50 or more homes to be accompanied by a statement of Community
benefit. Part (c) supports proposals for new homes that improve choice, this
includes a range of size of homes. Part (f) states that development proposals
for new homes on land not allocated for housing in the Local Development Plan
will only be supported in limited circumstances where: the proposal is supported
by an agreed timescale for build-out; the proposal is otherwise consistent with
the plan spatial strategy and other relevant policies including local living and 20
minute neighbourhoods; and either delivery of sites is happening earlier than
identified in the deliverable housing land pipeline, the proposal is consistent
with policy on rural homes, is for smaller scale opportunities within an existing
development or the proposal is for the delivery of less than 50 affordable homes
as part of a local authority supported affordable housing plan.
6.8 Green infrastructure is considered through Policy 20. Proposals incorporating
new or enhanced blue and/or green infrastructure will be supported. Where
appropriate, this will be an integral element of the design that responds to local
circumstances
6.9 Policy 21 relates to play, recreation and sport and requires development
proposals that are likely to be occupied or used by children and young people
to be incorporate well designed, good quality provision for play at an appropriate
scale. New streets should be inclusive and enable children and young people
to play in the neighbourhood. New play provision will as far incorporate a range
of requirements including being accessible. 
Page 53

Page 54

6.10  Policy 22 - Flood risk and water management states that proposals will not
increase the risk of surface water flooding to others, or itself be at risk; manage
all rain and surface water through sustainable urban drainage systems (SUDS),
and seek to minimise the area of impermeable surface. Policy 23 does not
support proposals which are likely to raise unacceptable noise issues. The
agent of change principle applies to noise sensitive development. Policy 24
supports proposals that incorporate appropriate, universal, and future-proofed
digital infrastructure.
6.11 Policy 27 - City, town, local and commercial centres part (e) relates to town
centre living. Development proposals for residential development within
city/town centres will be supported, including new build residential
development.
6.12 The proposed development lies partly within the Clyde Mission area where the
redevelopment of underused brownfield sites is supported. Following a policy
assessment, it is concluded that the detail of the proposal is supported by NPF4
and is assessed fully in Section 7 below. 
West Dunbartonshire Adopted Local Plan 2010 
6.13  Policy UR1 encourages the redevelopment and re-use of underused, vacant
and/or derelict land and buildings for appropriate uses such as housing. Policy
RD1 give preference to residential development on brownfield sites within the
urban area rather than on greenfield land. 
6.14 Policy H4 sets out standards expected of residential development, requiring
high quality design in the range of house types and sizes and in terms of form,
layout and materials. Policy H5 safeguards and where possible enhances the
character and amenity of existing residential area. Policy GD1 seeks to ensure
that all new development is of a high quality of design and respects the
character and amenity of the area. 
6.15 The site is listed in Schedule RET4 – Retail Development Opportunities.
RET4(2) is identified as being an opportunity for the erection of a Class 1
superstore of 8000sqm. These opportunity sites will be supported by the
Council for retail development subject to conformity with the provisions of Policy
RET 2 and other Local Plan policies. 
6.16 Policy RET5 seeks to improve the environment of the town centre of Clydebank
in partnership with other agencies. Applications for non-retail uses within the
designated town centres, will be favourably considered where they contribute
to the vitality and viability of the town centre and do not conflict with other Local
Plan policies. 
6.17  Policy BE 5 relates to Scheduled Ancient Monuments and other Archaeological
Sites. As the Forth and Clyde Canal is scheduled monument this policy applies.
Policy R4 – Forth and Clyde Canal also applies. Part A of this policy states
there will be a general presumption against development which is not
compatible with the objective of protecting and improving the recreational and
navigational amenity of the canal. 
Page 54

Page 55

Part C encourages recreational and sporting activities adjacent to the canal.
Part D relates to footpaths on the offside and Part F seeks to orientate
development towards and integrate with the canal. Policy BE2 seeks to ensure
that the setting of any listed building is not adversely affected. 
6.18 Policy R2 specifies the open space provision required for all developments.
Assessment of open space requirements has been undertaken against the
more updated “The Green Network and Green Infrastructure Guidance -
November 2022 as set out in Section 7 below. 
6.19  Policy T1 and T4 requires sites to be integrated with sustainable travel. Policy
E1 relates to the Council’s biodiversity duty and Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable
tree planting. Policies F1 and F2 aim to ensure that new development is not at
risk from, and does not increase the risk of flooding, and has suitable SUDS
drainage infrastructure. Policy DC7 supports the inclusion of on-site micro-
renewable technologies. 
6.20  As the site is identified within the adopted Local Plan as a retail development
opportunity, the proposed residential development is contrary to the Plan.
Following a full assessment of the application proposal, it is considered that the
material considerations are such that a departure from the adopted Local Plan
can be justified. This assessment is set out fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration.
7.2 The Clydebank Town Centre Development Strategy supports a range of
development including: 
• Maintaining the Clyde Shopping Centre as an attractive retail core while
allowing a greater mix of uses throughout the Town Centre;
• Developing a stronger evening economy, leisure opportunities and greater
residential development within and around the Town Centre;
• Transforming the area around the Forth and Clyde Canal as a focal point
and multi-functional area for recreation which connects people again with
the Canal; and
• Development of the former Playdrome site.
Page 55

Page 56

7.3 Clydebank Policy 3 encourages a mix of uses on the Playdrome site that deliver
high quality place-making and design standards. Development proposals
should align with the site briefs and Clydebank Can Guidance. On the
Playdrome site, development proposals for retail units that integrate with and
provide a strong frontage and relationship with the Canal, in accordance with
Policies WD1 and FCC1, will be supported.
7.4 Clydebank Proposal 1, Co-operative Building relates to proposal for the Co-
operative Building but also its setting and character for proposals in the
surrounding area due to its Category B listing. 
7.5 Policy CP1 seeks to ensure that housing is of a high quality, adaptable and is
designed to be suitable for a mix of occupants. It indicates that all new
development will be expected to contribute towards creating successful places
by having regard to the six qualities of a successful place (distinctive,
adaptable, resource efficient, easy to get to/move around, safe and pleasant,
and welcoming). Policy CP2 requires the integration and consideration of green
infrastructure from the outset of the design process through to its maintenance
and stewardship of the resource.
7.6 Policy H4 relates to residential amenity. The policy states that the Council will
protect, preserve and enhance the residential character and amenity of existing
residential areas at all times.
7.7 Other Town Centre areas (non-core town centre) are covered in Policy SC3.
Proposals for non-retail uses, including housing will be supported in these areas
where the development encourages visits to the Town Centre and are
appropriate to the Town Centre’s role and function. 
7.8 As the proposal area is within the scheduled area for the Forth and Clyde Canal,
applies. Policy BE1 states that where development would adversely affect a
scheduled monument or the integrity of the setting of a scheduled monument,
permission will only be granted where there are exceptional circumstances.
Policy FCC1 also relates to the canal and seeks to enhance this green network
asset. Development that would have an adverse impact on the canal or its
setting will not be permitted.
7.9 Policies GI2 and GI4 relate to green infrastructure. Policy GI2 requires new
development to meet with the open space standards set out within the policy.
Where a development has difficulty providing these standards on site, or where
a relaxation of the standards can be justified, developers will require to accord
with Policy GI4 and provide a contribution towards the types of projects outlined
within the policy and detailed in the Green Network and Green Infrastructure
Planning Guidance. GI4 sets out the requirements for Developer Contributions.
Policy CP2 requires the integration and consideration of green infrastructure
from the outset of the design process through to its maintenance and
stewardship of the resource.
Page 56

Page 57

7.10 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree, water
environment and flooding policies of the adopted Local Plan. Policy ENV8
requires developments to address air quality, lighting and noise as part of the
planning process, whilst policy ENV9 requires all potentially contaminated sites
to be remediated where necessary to ensure that the site is suitable for the
intended use.
7.11 Policy CON1 requires that significant travel generating uses are designed to
encourage sustainable transport. CON3 encourages improvements to core
paths, natural routes and access and Policy CON4 sets out a need for all
developments to install sufficient broadband provisions.
7.12 RE4 encourages micro-generation within or associated with individual
properties and Policy RE5 relates to low and zero carbon buildings and states
that new buildings should conform to the sustainability standards. 
7.13 It is considered that the development proposal being assessed complies with
the relevant policies and development strategy as addressed below.
Creating Places Guidance and Green Network and Green Infrastructure
Guidance
7.14 The Creating Places Guidance – November 2022 seeks to achieve high quality
development with a design led approach based on a thorough appraisal of the
site and an analysis of its context, and sets out that this is expected for all
development proposals. The proposal has been informed by a comprehensive
pre-application process as encourage by the Guidance. This has resulted in a
development proposal that achieves a high quality design that responds to the
local context and accords with the approach set out in the Creating Places
Guidance. 
7.15 The Green Network and Green Infrastructure Guidance - November 2022
seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space
created. This will include a focus on biodiversity enhancement. The on-site
provision follows the above Guidance in respect of residential development
proposals. The open space also integrates with the wider green network
adjacent inclusive of pathway connections and accords with the above
Guidance.
Clydebank Town Centre Development Framework 2021
7.16 This document provides a framework for Clydebank town centre to deliver the
social and cultural ambitions of the community. The document identifies that
what is needed now, amongst other things, is residential development within
the town centre. The Playdrome site itself is shown as a residential site within
the Priority Phase 1 within this document. Also identified within the vision for
Clydebank Town Centre is the reconnection of the new “centre” with the canal,
the river and transport infrastructure to create a new public “heart” for the town.
One of the key concepts of this is a new linear park connecting the town centre
to Queens Quay and the Forth & Clyde Canal which is brought forward as part
of this application. 
Page 57

Page 58

Whilst the Framework sets out a development mix of flatted blocks together
with family housing, the proposal being considered does not include flats nor
does it incorporate some ground floor active uses to key edges and corners of
the site as identified in the Framework as a potential approach, overall, the
development is supported by the Framework. 
Principle of Development
7.17 The site is a brownfield site within the town centre of Clydebank. It is not
specifically identified in either the adopted Local Plan (LP) or the proposed
Local Development Plan 2 (LDP2) as a residential development opportunity.
Whilst not identified as a residential development opportunity, the sustainable
re-use of brownfield land is supported through Policy 9 of NPF4. Policy 16
requires development proposals for 50 or more homes to be supported by a
Statement of Community Benefit and this has been provided by the applicant.
The Statement demonstrates that the proposal meets local housing
requirements, enhances local infrastructure and improves the residential
amenity of the surrounding area and brings residential development back into
the town centre. Policy 16 also supports development proposals for new homes
on land not allocated for housing where they are supported by an agreed
timescale for build-out, that the proposal is otherwise consistent with the plan
spatial strategy and other relevant policies including local living and 20 minute
neighbourhoods. However Policy 16 also requires housing on allocated sites to
either be delivery of sites earlier than identified in the plan, consistent with policy
on rural homes, for smaller scale opportunities, or for less than 50 affordable
homes as part of a local authority supported affordable housing plan. This
proposal does not fit into any of these categories however it should be
acknowledged that the aspirations for the site have changed since both the
adopted Local Plan and proposed Local Development Plan 2 were written.
West Dunbartonshire Council’s 2021 Clydebank Town Centre Development
Framework identifies the former Playdrome site as a site primarily for residential
development and is supported by Policy 15 encouraging local living. 
7.18 The site now also sits within the Clyde Mission Area. The Clyde Mission is
focused on the River Clyde and the riverside from South Lanarkshire in the east
to Inverclyde and Argyll and Bute in the west and focusing on an area up to
around 500 metres from the river edge. Clyde Mission is an ambitious
redevelopment programme being taken forward. It is a collective, cross-sector
effort and partnership working will help bring forward assets and sites that are
ready for redevelopment to sustain a range of uses. Mixed use, including
residential and redevelopment of brownfield land is within the designation and
classes of development contributing to Clyde Mission. In further assessing the
application proposal, it is also noted that this site was first taken to market by
this Council in 2009. Given the location of the site within the town centre, the
primary focus was to regenerate the site for commercial/retail uses. However,
due to a shift in market trends, the site is no longer attractive for such uses.
Having attempted to dispose of the site for nine years for commercial uses, it is
clear that the site being brought forward for residential uses is the only, current
viable development option which also meets the ambitions of Clydebank
Development Framework and NPF4. 
Page 58

Page 59

7.19 The proposal to redevelop underused and vacant land is also supported by
Policy UR1 of the Local Plan together with Policy RD1 which sets out a
preference for residential development on brownfield sites. Policy H2 of
proposed LDP2 supports new housing development on sites in Schedules 2
and 3, this Policy does not preclude the development of other sites where
appropriate. 
7.20  Policy 27 of NPF4 further supports the development of housing on this site. The
site is identified as being part of the Town Centre in the adopted Local Plan.
Part (e) of Policy 27 supports development proposals for residential
development within town centres including new build residential development.
Within the LDP2, Policy SC3 supports housing where the development
encourages visits to the town centre and are appropriate to the Town Centre’s
role and function. The role and function of town centres in general has changed
in recent times with a reduction in the floorspace required. A housing
development retains people within the town centre, extending its hours of use
and increasing its role and vibrancy. The Clydebank Town Centre Development
strategy further supports the position of bringing residential development into
the town centre by encouraging allowing greater mix of uses throughout the
town centre and also identifies the Playdrome site as a site for development.
Policy 15 of NPF4 supports development proposals that will contribute to local
living including, where relevant, 20 minute neighbourhoods. The provision of
new residential properties within an accessible town centre area inclusive of
nearby transport links contributes to local living in accordance with the policy.
7.21 Overall, the application site is identified as a retail development opportunity
within the adopted Local Plan and not specifically as a residential development
opportunity within proposed Local Development Plan 2. Whilst the development
does not meet the criteria of Policy 16 of NPF4 more weight should be attached
to other NPF4 policies regarding local living, town centre living and the use of
brownfield sites. Therefore, the principle of the development of housing on this
brownfield site, situated within the town centre of Clydebank and within the
Clyde Mission area can be supported. A departure from the development plan
can therefore be justified in this instance for the reasons outlined above.
Site Layout, Design and Appearance
7.22 New residential layouts require to be well designed, take cognisance of the
setting into which they are introduced and provide a high quality environment
of well-designed buildings in a setting of gardens and open space whilst
recognising the impact on existing neighbouring properties. The site is located
within the defined town centre, however, residential areas lie to the east and to
the south beyond the railway. To the south, on Whitecrook Street (which has
its rear gardens bounding Argyll Road) there are three storey terraced tenement
flats and to the south are a mix of two storey, terraced houses as well as four
storey blocks of flats although these are blocked from view by the railway line.
The proposed development follows the overall theme and pattern of
development by emulating the terraced pattern in the locality whilst providing a
wider range of housing types in the housing sizes. It is considered that the
density of development is compatible with the character and amenity of the
wider adjacent residential area and appropriate for a town centre location. 
Page 59

Page 60

7.23 It is recognised that the layout requires to be designed to respond to the
constraints of the site, including surrounding roads, commercial properties and
the adjacent canal which is a scheduled monument. A large sewer is also
located under the northern part of the site fronting the canal. There is one
existing vehicular access point which will remain as is with a main loop road
extending from this through the new development with further streets spurring
off. Pedestrian links are, however, strengthened with multiple pedestrian links
to and from the site from Argyll Road as well as a pathway connecting the canal
tow path, through the open space and into the site. Whilst the sewer precludes
the development of buildings fronting the canal, the development takes the
opportunity to locate an area of open space and landscaping next to the canal
tow path providing an attractive Canal frontage with pedestrian links to the
development and Argyle Road ensuring this area is active. This approach, also
reduces any impact upon the Canal as a scheduled monument. Separation is
gained between the residential and commercial properties by the inclusion of a
linear park. This also provides a green linkage and pedestrian route through
what was once a very impenetrable site linking the Canal and Church to the
railway station before connecting to Titan Boulevard via Hume Street. The
creation of a linear park is a key aspect of the Clydebank Town Centre
Development Framework. 
7.24 Considering design, the proposed buildings are two and three storeys in height
with a variety of different house types which will assist in creating visual interest
within the development. The proposed houses will be of a modern design and
it is considered that this approach will enhance and contribute positively to the
aesthetic of the area. The houses will also feature solar panels incorporated
into the roof covers. Whilst the Clydebank Town Centre Development
Framework sets out a development mix of flatted blocks together with family
housing, the proposal being considered does not include flats. However, the
use of three storey buildings to reinforce the edges of the development and
maximise density on this town centre site responds to the overall approach set
out in the Development Framework. It is therefore considered that the proposed
layout has responded to, and made the most of the site and its surrounding
environments and what is proposed successfully integrates into the wider area.
The built ratio of each plot accords with the requirements of the Council’s
Creating Places Guidance (2022) and this ensures a suitable level of garden
ground and associated private amenity space is provided for new residents. 
7.25 Turning to the proposed materials, the new houses will be finished externally in
facing brick and a concrete tile roof. The facing brick details submitted by the
applicant comprise of two clay bricks, one in a red tone and one in a buff tone
with an industrial appearance. The use of clay bricks provides a high quality
visual appearance and this material is a positive addition to the wider
development. The use of such a material is in accordance with the established
approach taken on other sites where the use of high quality materials has been
proposed to ensure the best possible development. The use of appropriate
conditions will ensure the acceptable bricks are used as well an appropriate
mortar colour. 
Page 60

Page 61

The development has been subject of extensive pre application discussions
with the Placemaking Co-ordinator and Planning Officers to ensure it provides
a high quality development in terms of layout, design and materials which
responds to the town centre location. 
7.26 In further considering the appearance of the new development, it is
acknowledged that street furniture can have an adverse visual impact and dilute
the quality of the appearance of the development if not carefully considered. It
is therefore appropriate to attach a condition requiring full details of the siting
and position of items such as telecommunications cabinets and grit bins. 
7.27 Overall, it is considered that the proposal will create a well-designed and
integrated development which will address the six qualities of successful places
by having a distinctive identity, forming safe streets, having quality green
infrastructure, using high quality materials and being sustainable, all complying
with policies GD1, DS1 and CP1 of the adopted and proposed Plans alongside
the Residential Development Design Guidance. 
Impact on the Forth and Clyde Canal
7.28 The site lies adjacent to the Forth and Clyde Canal which is a scheduled
monument. The length of the monument is approximately 3 miles (5 km) and
runs from the western edge of Old Kilpatrick (on the west) to a point 600m west
of the bascule bridge at Linnvale (on the east). The monument includes the
entire length in water together with the banks on either side together with the
tow path running along the side. It is a superlative example of Georgian civil
engineering. It was the first of Scotland's great inland waterways to be
constructed (between 1768 and 1790). Policy 7 of NPF4 relates to scheduled
monuments and supports development that where direct impacts on scheduled
monuments are avoided and significant adverse impacts on the integrity of the
setting are avoided. The Canal has much activity surrounding it and this
residential development will only enhance this activity. Policy FCC1 of proposed
LPD2 and Policy R4 of the Local Plan relate to the Forth and Clyde Canal itself.
These policies seek to enhance the green network asset and also encourage
recreational activities adjacent to the canal. The play park element of the
proposal is adjacent to the Canal which is supported by these policies. Scottish
Canals in their consultation response noted that vibro-piling is proposed and
that this would require further details. Also details of any public realm lighting in
areas adjacent to the Canal are requested as well as litter bins. The
requirement for Third Party Works approval is also noted and that access to the
Canal should be maintained at all time. It is considered that these points can
be addressed by condition. Historic Environment Scotland have no objections
to the proposal but note the requirement for Scheduled Monument Consent.
West of Scotland Archaeology Service have noted that no archaeological
issues arise and no conditions are required. 
Residential Amenity
7.29 In assessing the amenity of both existing residents within the town centre the
site has been cleared of development in the recent past although what was
there previously was not a residential development. 
Page 61

Page 62

Whilst the new development will introduce new houses in proximity to existing
residential properties where it was previously a leisure centre, the scale and
massing of the previous building was significant and the new houses will likely
have a lesser impact. It is acknowledged that the new buildings will, however,
extend across a larger area of the site than the leisure centre. The row of
tenement flats which has their rear gardens facing onto Argyll Road is three
storeys in height, with the majority of the proposed development being two
storey in height with some three storey properties. It is further considered that
there is no adverse impact on daylight or sunlight to the nearest houses will
occur due to the separation distances proposed. Window to window
relationships within the development itself are also acceptable. The inclusion of
a play park within the vicinity will be a positive addition to residential amenity as
will the addition of further pedestrian links through the site. The development
will undoubtedly bring additional activity to the area, the occupation of new
dwellings is not expected to cause any noise or activity beyond that typically
found in a town centre area. 
7.30 Whilst it is accepted that any construction site will produce an element of short
term noise and disruption, the Council’s Environmental Health Service highlight
the requirement that the construction of the development is undertaken in a way
that ensures that adjacent residential amenity is not adversely affected. A range
of conditions are recommended and it is considered appropriate to attach these.
These include restricting construction working hours to 8am to 6pm Monday to
Friday and 8am to 1pm on Saturdays. Conditions relating to piling and dust
control are also recommended. 
7.31 In further assessing the amenity of the residents of the new houses proposed
there are a number surrounding noise sources due to the sites central location
within the existing settlement of Clydebank. In order to address the impact
created from the surrounding noise sources, including the adjacent Argyll Road,
acoustic fences are proposed for some properties. In a limited number of
properties these acoustic fences reach a height of 3 metres. The majority of
acoustic fences proposed are 2.5 metres in height. In support of the application,
a Noise Impact Assessment (NIA) was submitted. The Council’s Environmental
Health Service has commented that the NIA makes assumptions throughout
the document. As such conditions will be required relating to
validation/verification of the mitigation measures proposed. This would consist
of a report being submitted detailing the various specifications of acoustic
glazing, ventilation, and construction elements being installed in each of the
properties in line with the colour coded drawings that form part of the NIA. Whilst
further details are required, it is overall concluded that there are no significant
concerns regarding noise that would make the development unacceptable. As
such conditions are recommended in relation to an updated NIA to be
submitted. 
Page 62

Page 63

Traffic, parking and road safety
7.32 The applicant has submitted a Transport Statement in support of the proposal.
Whilst, the Transport Statement notes that one hundred and twenty seven
houses are proposed and that all are terraced, the proposal as submitted is for
one hundred and twenty eight houses in a mix of terraced and semi-detached.
These minor variations do not impact on the ability to assess the proposal. 
7.33 The development site incorporates an existing area of public parking located to
the west of Abbotsford Road. This area comprises some one hundred and
ninety two spaces, including five accessible spaces, used presently by visitors
to neighbouring facilities. These parking spaces currently serve a number of
uses, including overspill from the adjacent shopping centre, in particular the Co-
op building, the Credit Union building immediately adjacent and the Waterfront
Church to the north. A degree of staff parking for the shops and businesses is
also likely. It is also possible that a certain amount of park-and-ride activity may
take place in this area. Parking surveys were carried out by the applicant on a
number of days at a variety of times in order to assess the level of parking within
the area. It was concluded there is more than sufficient free parking available
in neighbouring commercial parking area to accommodate the diversion of
existing parking on the development site, should it be displaced by the
proposed residential development.
7.34 In terms of parking within the residential development proposed, one hundred
and twenty eight private vehicle spaces are provided, on-street for the one
hundred and twenty eight properties. In addition there are twenty two general
visitor bays including nine disabled bays. Twenty eight further spaces are
proposed to be created to serve the existing properties including the adjacent
Credit Union building. Three electric vehicle charging points are proposed to be
located within visitor parking spaces. 
7.35 In assessing traffic generated by the new development, it is important to
acknowledge that any trip generation must be offset against the former
development use of the site. The Transport Statement states that it would be
the case that traffic was generated by the previous Leisure Centre use during
the weekday morning and evening commuting peak hours when a residential
development would also be expected to generate its peak travel activity. Thus
the figures would in practice be higher than any net new travel on the local
transport network as a result of the proposed residential development. This is
considered within the Transport Statement as being readily capable of being
accommodated by the existing transport network in and around the site. Given
that the predicted residential development trip generation would, in practice, be
reduced due to the effect of the previous leisure centre trips being removed
from the local road network, it is considered that the traffic and travel impact of
the proposed residential development would be accommodated on the local
travel networks. 
Page 63

Page 64

7.36 The Council’s Roads Service has considered the application proposal and has
no objections in regard to the site access being served by the existing access
from Abbotsford Road as road widths and geometry are all acceptable. Parking
levels provided are concluded to be below the prescribed parking standards
however due to the close proximity to local transport provision and good active
travel links are considered to be acceptable. It is however noted that the
application details suggests the creation of a temporary access from Argyll
Road for the construction phase of the development. The Roads Service would
refuse this request unless evidence is provided to show that safe access/egress
cannot be maintained from Abbotsford Road. As such it is recommended that
any granting of permission attach a condition relating to the submission of a site
management scheme for construction traffic. 
7.37 Concerns regarding the removal of parking, the impact that the removal of
parking will have on the surrounding area and the proposals perceived failure
to meet the West Dunbartonshire Council parking standards are raised in the
objections submitted. The Council’s Roads Service note that the parking
standards adopted by the Council follow the guidance provided in the National
Roads Development Guidelines. Whilst the Guidelines do provide some
expected parking provision levels, they also highlight that these can be adapted
to suit proposed developments which are located in central locations. In main
urban areas where a development is serviced by good active travel and public
transport links with access to healthcare, education, food shopping and
employment these parking levels can be reduced. The former Playdrome site
is centrally located within Clydebank with short walking distances to Chalmers
Street Bus services and Clydebank Train Station. Chalmers Street and the
surrounding area is serviced by 22 different bus services providing access
across Clydebank, into Glasgow and east to Dumbarton. The site is also located
adjacent to the NCN7 route providing an off road cycling route to both
Dumbarton and Glasgow, as well as access onto other parts of the road
network. West College Scotland is located in close proximity to the site as is
Whitecrook and Cunnard Primary School providing access to education.
Additionally Clydebank Shopping Centre, Clydebank Health Centre and the
Golden Jubilee Hospital are also within a short walk or transport ride of the
development site, all of which provides the opportunity to reduce the parking
provision which would be normally required in a more residential suburban
environment. 
7.38  In regards to the reduced parking provision for those wishing to use the
shopping centre and local transport whilst the proposal will remove 192 public
parking spaces there is existing capacity within the public car park on
Coldstream Road to accommodate required parking levels. Parking survey
evidence provided in the Transport Statement, albeit only surveyed over two
week day periods and one Saturday period, highlights that the existing parking
within Coldstream Road is underutilised and has the capacity to cope with the
additional demands. 
Page 64

Page 65

7.39 In support of the application the applicant has submitted an Access Statement
which addresses vehicular and pedestrian access arrangement that have a
direct effect on the existing operators/users/businesses who solely make use
of Abbotsford Road. The statement covers the measures that have been agreed
with each of the existing users to ensure that their access is preserved both
during the construction period and beyond. The Salvation Army, The Dalmuir
Credit Union, the Clydebank Shopping Centre, The Clydebank Co-Operative
and the Church of Scotland – Waterfront Parish Church are all outlined within
the statement as having had access rights created as well as additional parking
spaces in some cases. 
7.40  As such it is considered that the removal of existing parking in order to make
way for the new residential development will not have a significant adverse
impact as there are alternative vehicle parking areas within the vicinity as well
as good public transport links and the Council’s Roads Service offer no
objection to the proposal on this basis. The addition of one hundred and twenty
eight homes into the town centre will increase footfall and vitality which in turn
will have a positive impact to the local area and an economical boost to local
businesses and other community uses. 
Sustainable Transport
7.41  The site is located within the heart of Clydebank. The further point in the north
of the site is approximately 315m from the bus stops on Chalmers Street. These
existing stops, at the time of the Transport Statement, served 22 different bus
services. In addition, the entrance to Clydebank Railway Station, also on
Chalmers Street, is approximately 360m from the furthest point in the north of
the site. The development site benefits from a wide range of pedestrian
facilities, including traffic signal controlled crossing of Argyll Road to the east
and Chalmers Street to the south. Cycling is catered for in the form of National
Cycling Route 7 which runs east – west along the Forth and Clyde Canal,
turning south from the Canal adjacent to Argyll Road and continues east into
Glasgow and west to Dumbarton and beyond. To the east of Argyll Road, Route
7 becomes Route 754 and follows the Canal east with connections to other
routes to Glasgow City Centre before continuing east towards Edinburgh. It is
therefore concluded that the combination of a regular train service, high
frequency bus services, dedicated off road cycle routes and a well-established
pedestrian network ensure that the site is highly accessible in terms of access
to sustainable transport. The site is also located within the heart of the town
centre with a wide range of facilities within walking distance. In addition, the
applicant has provided a travel information pack which encourages reduced
dependency on the private car by highlighting the location of local amenities,
public transport services and active travel routes to be provided to the residents
of the new houses. It is recommended that the provision of this travel plan is
conditioned. 
Page 65

Page 66

Trees, landscaping and open space
7.42 A variety of trees exist within the site. These are in the form of boundary planting
and amenity planting within what was the car park of the leisure center. They
are not protected by a Tree Protection Order and formed part of the soft
landscaping scheme for the leisure centre that previously occupied the site. It
is accepted that trees internal to the site are required to be removed in order to
accommodate the new development. It is not considered that they are
significant specimens and new tree planting is provided (one hundred and six
new trees proposed) as part of the new development. The existing tree planting
around the boundary of the site will be retained as part of the new development.
7.43 The landscaping strategy includes a variety of plants, flowers and trees to
encourage wildlife and biodiversity to the site. In terms of hard landscaping
areas, variety is also proposed with a mix of materials. New tree planting is also
proposed throughout the development. The Council’s Biodiversity Officer offers
no objection to the approach to the proposed landscaping. The overall
approach to planting is considered appropriate and the implementation and
maintenance can be addressed by condition. 
7.44 In respect of open space within the proposed development, this is principally
comprised of a large area of open space which includes play equipment to the
north of the site and a linear park to the west of the site. There is also green
space between the houses and the boundary of the site as well as pockets of
green space throughout the development. In terms of the requirements of Policy
GI2 of proposed Local Development Plan 2 together with the Our Green
Network guidance, the required greenspace for the number of bedrooms
provided within the overall development of this site is 9363sqm. The
greenspace for this site provided exceeds this required number and therefore
the level of green space provided by the development is acceptable. 
7.45 As noted, there is a proposed play park to be included within the green space
at the north of the site, between the housing development and the Forth and
Clyde Canal. The inclusion of a play park is in accordance with the aims of
Policy 21 of NPF4 which requires development proposal that are likely to be
occupied or used by children to incorporate well designed, good quality
provision for play at an appropriate scale. However, no details of the play
equipment which is to be installed has been provided. A condition requiring this
detail to be provided would ensure that the range of requirements of Policy 21,
including inclusivity are met. 
7.46 Overall, there is no unacceptable impact on existing open space and the quality
and range of open spaces will all contribute to the overall success of the
transformation of this vacant site. 
Flooding and drainage
7.47 Parts of the site are identified as having a medium flood risk for surface water.
The Council’s Roads Service noted that the development of the site would
address the existing surface water flood risk. SEPA have no objections to the
proposal. 
Page 66

Page 67

In terms of drainage, SuDS is incorporated into the development to address
surface water, with attenuation proposed within an area to the south west of the
site. Whilst details of the overall approach is provided, this is not supported by
detailed calculations to allow it to be concluded that the design capacity is
appropriate. Overland flow pathways are also not provided and it cannot be
concluded that any run-off in extreme events will not impact on either the
existing or proposed residential properties. However, there is no suggestion
that a suitable system cannot be provided and final details can therefore be
addressed by condition. 
Ecology
7.48 There are no environmental designations covering any part of the site however
the Inner Clyde which is designated as an area of SPA, SSSI, Ramsar and
RSPB reserve is found approximately 0.5km south of the site. The Ecological
Constraints Survey does however conclude that due to the distance from the
site there will be no impacts upon the Inner Clyde designations. The survey
report does not highlight any protected species of concern. Whilst the area may
provide suitable habitat for foraging otter and water vole, no field signs of either
were found. A pre-construction survey for otters is however recommended as
part of the survey report. Due to the high mobility of wildlife and to re-establish
the ecological baseline, if the proposed works are not commenced within 12
months of the report it is recommended that the project ecologist should be
contacted to determine the requirement for repeat ecological surveys. This
should also be conditioned. The report also highlights the timing of the works
to take account of nesting bird season and this is recommended to be
conditioned for any granting of permission. Further recommendations are
contained within the preliminary ecological appraisal including Tool Box Talks
for contractors, tree and vegetation removal to be avoided outwith the bird
nesting season, pollution prevention measures in relation to the canal, removal
of non-native species, avoidance of injury, obstruction and disturbance of
mammal species, sensitive lighting designs to avoid affecting foraging or
commuting bats, and biodiversity enhancement measures. This will be
addressed by condition. The Council’s Biodiversity Officer also offers no
concerns in respect of the proposal in respect of ecological impact or the
findings of the ecological appraisal.
Other Technical Matters 
7.49 A ground investigation report has been submitted in support of the proposal
however the Council’s Environmental Health Service have noted that the site
investigation is incomplete. As such contaminated land conditions should be
added to any granting of planning permission. Other recommended conditions
from Environmental Health relate to air quality and lighting. Scottish Water offer
no objection noting current capacity within the existing network. 
7.50 The site includes within it, Core Path 119 which is the tow path which runs
alongside the canal. Whilst no works are being done which would involve the
Core Path being diverted, a condition is recommended to ensure that the Core
Path is not obstructed during construction.
Page 67

Page 68

7.51 The Council’s Education and Cultural Services offered no objections. Figures
provided show three hundred and eighty nine spaces currently available within
the two high schools within the catchment area for the site. Five hundred and
eighty seven spaces are also currently available within the three primary
schools for the area as well as a possible further three hundred and forty eight
spaces within one other primary school which could possibly lie within the
catchment area of the site dependant on the postcode it is allocated. 
Pre-application Consultation
7.52 The proposal constitutes “national” development under the Town and Country
Planning Hierarchy of Developments (Scotland) Regulations 2009, and
therefore statutory pre-application consultation is required prior to the
submission of the planning application. The applicant submitted the Proposal
of Application Notice (reference PAN22/002) in February of 2022. At this time
the Covid emergency legislation was still in place. Two public meetings were
held, one virtually on the 4th of April 2022 and one in person at Waterfront Parish
Church on 3rd of May 2022. The applicant also created a micro-webpage in
order to raise awareness of the proposal. Approximately 25 people attended
the face to face event. During the pre-application consultation process the main
points raised by interested parties related to parking provision and its loss,
access to and from the development, access rights and the developments
integration with surrounding businesses and organisations. 
Place and Design Panel
7.53 The design proposal was reviewed by the Council’s Place and Design Panel in
July 2022. The general design principles that underpin the scheme including a
legible street pattern, back to back gardens and clear pedestrian routes were
welcomed by the Panel. Whilst the proposal does move away from the specific
layout and typology within the development framework, the layout, the Panel
considered that it arguably delivers a more permeable development which
helps to promote pedestrian movement through the town centre. The provision
of outward facing areas of landscape, play and public realm were welcomed as
was the introduction of townhouses. Their location at key edges of the site was
acknowledged, and suggested that further detail sections may support the
continued refinement of their placement. The panel welcomed the applicants
desire to introduce different roof types, especially those seen on the
townhouses, where the introduction of a saw tooth profile helped to break up
the massing of the development as a whole. The discussion focussed on more
detailed elements of the proposal that should be refined further in its
development. The comments of the panel were taken into account in concluding
the final design.
Elected Members Briefing
7.54 Following the Place and Design Panel, an Elected Members Briefing was held
on 9th August 2022. This briefing provided Members with details of the proposed
residential development on the site and the main issues that would require to
be addressed in the planning application submission. 
Page 68

Page 69

Members were afforded the opportunity to highlight any issues which they
considered the forthcoming application submission required to consider or
address and this included housing mix, emergency access, linkages to adjacent
facilities, access to the public open space and factoring arrangements, parking
provision, EV charging and managing construction traffic. 
8. CONCLUSION
8.1 The site is within the defined town centre and whilst not an allocated site for
housing National Planning Framework 4 encourages vitality and viability of town
centres through town centre living. Subject to the appropriate use of conditions,
the proposed development is acceptable. The layout and design of the
development has been developed to ensure that it integrates with the existing
form as well as creating a high quality development which enhances the local
area whilst also taking into consideration the constraints of the site. The
development will provide much needed housing in a central town centre
location with good connections to the surrounding area and wider green
network. 
8.2 The proposal will result in a high quality residential development. It is
acknowledged that whilst contrary to specific aspects of the Development Plan
in respect of the retail development opportunity allocation in the adopted Local
Plan, the aspirations for the site have evolved since this Plan was prepared.
The Clydebank Town Centre Development Framework 2021 identifies the need
for residential development within the town centre with the Playdrome site itself
is shown as a residential site within the Priority Phase 1. The proposed
development will deliver this priority. The proposal is not an allocated residential
development opportunity in the Local Development Plan and thus does not fully
accord with the requirements of Policy 16 of NPF4. However, considering NPF4
as a whole, the proposal is considered to be in accordance with the spatial aims
most notably in respect of Clyde Mission, redeveloping brownfield sites,
contributing to town centre living and 20 minute neighbourhoods. 
8.3 The proposed redevelopment of this prominent brownfield site within the town
centre site with one hundred and twenty eight new dwellings in a mix of two,
three and four bedroom homes is welcomed. The proposal will result in a high
quality and permeable development creating positive relationships with
adjacent streets and spaces. The proposed development will also bring
residents into the town centre, supporting the economy of the town centre and
adjacent community uses. 
9. CONDITIONS
1. Prior to the commencement of development on site, exact details, specifications
and samples of all proposed external materials to be used within the development
site shall be submitted to and approved in writing by the Planning Authority. For
the avoidance of doubt, all facing bricks to be used shall be good quality clay bricks.
Thereafter, unless otherwise first agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved material
details and palette.
Page 69

Page 70

2. Further to Condition 1 above, prior to the approved brickwork associated with any
house being constructed on site, a sample panel of the brickwork shall be
constructed on site in order for it and the associated mortar to be reviewed,
inspected and approved in writing by the Planning Authority. Thereafter, unless
otherwise first agreed in writing with the Planning Authority, the development shall
be completed in strict accordance with the approved brick details. 
3. Prior to the commencement of development on site, full details of the
timescale/phasing for the build-out of the development shall be submitted to and
approved in writing by the Planning Authority. Works shall then proceed as
approved unless an alternative timescale is first agreed in writing by the Planning
Authority. 
4. Prior to the commencement of development on site, full details of all hard surfaces
shall be submitted for the further written approval of the Planning Authority. The
development shall thereafter be proceed in accordance with the approved details. 
5. Prior to commencement of development on site, a 'Play Equipment Strategy' for
the site shall be submitted to and approved in writing by the Planning Authority.
This shall include (but not be limited to) the following: 
• Details and specifications of forms of play equipment and structures to be
provided within the site. 
• Provide full details regarding the maintenance arrangements for all play
equipment and associated features within the site. 
• Provide timescales for implementation of the play equipment. 
Thereafter, the approved play equipment strategy and all associated features
and specifications shall be installed within the development in accordance with
the strategy unless otherwise first agreed in writing by the Planning Authority
and maintained in accordance with the approved details for the lifetime of the
development. 
6. Notwithstanding the approved plans, all recommendations within the Ecological
Constraints Survey dated 23th August 2022 shall be followed. This shall include all
required further survey work identified as being required for otters. Further survey
work undertaken shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of development on site and implemented as
approved. 
7. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of development on site, the recommendations in paragraph 4.2.12
of the  Ecological Constraints Survey dated 23th August 2022, in respect of re-
establishing the ecological baseline shall be followed and the approach to this
submitted to and approved in writing by the Planning Authority. 
Page 70

Page 71

8. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of development on site, a further submission which demonstrates
an understanding on how the proposal enhances biodiversity beyond the current
baseline including any adjustments to the approved landscaping proposals
together with the implementation details on site shall be submitted to and approved
in writing by the Planning Authority. All measures shall then be implemented as
approved. 
9. Prior to commencement of development on site, a full planting schedule shall be
submitted for the further written approval of the Planning Authority. Thereafter, the
approved hard and soft landscaping and all associated approved planting details
shall be implemented within a timescale to be agreed with the Planning Authority
prior to the commencement of works on site. 
10. Any trees, shrubs or areas of grass which die, are removed, damaged or become
diseased within five years of completion of the landscaping shall be replaced within
the following year with others of a similar size and species. 
11. Prior to commencement of development on site, a site management scheme for
construction traffic, shall be submitted to, and approved in writing by the Planning
Authority and thereafter shall be implemented in accordance with the approved
scheme. For the avoidance of doubt, construction access shall only be taken via
Abbotsford Road and at no time will any vehicular access be taken to or from Argyll
Road, unless otherwise agreed in writing with the Planning Authority. 
12. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course. 
13. That within 4 weeks of the last of the houses hereby permitted being completed,
all roads and footways within the application site shall be completed to a final
wearing course. 
14. Prior to the occupation of any house, the on-street parking provision associated to
that house shall be completed and be available for use by residents of the
associated house. The on-street parking provision shall then remain unobstructed
and available for use by residents of the associated house at all times thereafter. 
15. The additional parking provided on Abbotsford Road, as identified on drawing
ARC/SITE001 Rev Q – Site Layout shall be constructed and made available for
use prior to the removal of the existing parking area. 
16. That prior to the commencement of development on site, full details of the
proposed drainage regime inclusive of calculations and overland flow details shall
be submitted to and approved in writing by the Planning Authority. The drainage
regime shall then be implemented and maintained thereafter. For the avoidance of
doubt, the drainage regime shall be implemented commensurately with the
construction of the houses it serves. 
17. That all surface water shall be intercepted within the site both during construction
and on completion of the development and full details of measures to ensure that
Page 71

Page 72

surface water run-off is contained within the site shall be submitted to and approved
in writing by the Planning Authority prior to the commencement of development on
site. The measures shall be implemented and maintained as approved. 
18. The approved car charging points/units/ducting and associated infrastructure shall
be installed in accordance with the approved details in a timescale agreed by the
Planning Authority and maintained at all times thereafter. 
19. Prior to the occupation of the first house within the site, the developer shall install
the necessary infrastructure to enable the full development and all associated
properties to be connected to the existing fibre optic network, where available in
West Dunbartonshire, and in accordance with the relevant telecommunications
provider’s standards. 
20. Prior to the commencement of development on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets as well as lighting and bins
adjacent to the canal, shall be submitted to and approved in writing by the Planning
Authority and within a timescale agreed with the Planning Authority. 
21. The Residential Travel Plan as approved as part of this application shall be
provided on occupation of each dwelling to new residents. 
22. No development (other than investigative works) shall commence on site until such
time as a revised report on the nature and extent of any contamination of the site
has been submitted to and approved in writing by the Planning Authority. The
report shall be prepared by a suitably qualified person and shall include the
following: 
a) A detailed site investigation identifying the extent, scale and nature of
contamination on the site (irrespective of whether this contamination originates
on the site) 
b) An assessment of the potential risks (where applicable) to: 
• human health 
• property (existing and proposed), including buildings, crops, livestock, pets,
woodland and service lines and pipes 
• groundwater and surface waters 
• ecological systems 
• archaeological sites and ancient monuments 
c) An appraisal of remedial options, including a detailed remediation strategy
based on the preferred option. 
23. No development (other than works) shall commence on site until such time as a
detailed remediation scheme for the site has been submitted to and approved in
writing by the Planning Authority. The scheme shall be prepared by a suitably
qualified person and shall detail the measures necessary to bring the site to a
condition suitable for the intended use by removing unacceptable risks to human
health, buildings and other property, and the natural and historical environment.
Page 72

Page 73

The scheme shall include details of all works to be undertaken, the remediation
objectives and criteria, a timetable of works and/or details of the phasing of works
relative to the rest of the development, and site management procedures. The
scheme shall ensure that upon completion of the remediation works the site will
not qualify as contaminated land under Environmental Protection Act 1990 Part IIA
in relation to the intended use of the land after remediation.
24. The approved remediation scheme shall be carried out in accordance with its terms
prior to the commencement of development other than that required to carry out
remediation, unless otherwise agreed in writing by the Planning Authority. The
Planning Authority shall be notified in writing of the intended commencement of
remediation works not less than 14 days before these works commence on site.
Upon completion of the remediation works and prior to the site being occupied, a
verification report which demonstrates the effectiveness of the completed
remediation works shall be submitted to and approved in writing by the Planning
Authority.
25. The presence of any previously unencountered contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease. At this stage,
if requested by the Planning Authority, an appropriate investigation and risk
assessment shall be undertaken and a remediation scheme shall be submitted to
and approved by the Planning Authority prior to the recommencement of site
works. The approved details shall be implemented as approved.
26. If the remediation plan requires it then a monitoring and maintenance scheme
(including the monitoring of the long-term effectiveness of the proposed
remediation) shall be submitted to and approved by the Planning Authority. Any
actions/measures ongoing shall be implemented within an agreed timescale with
the Planning Authority. Following completion of the actions/measures identified in
the approved remediation scheme a further report which demonstrates the
effectiveness of the monitoring and maintenance measures shall be submitted to
and approved by the Planning Authority.
27. If there is a requirement to either re-use site won material or to import material then
the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition to
this and in accordance with BS3882:2015 and BS8601:2013, material to be used
in the top 300mm shall also be free from metals, plastic, wood, glass, tarmac, paper
and odours.
On completion of the works and at a time and/or phasing agreed by the Planning
Authority, the developer shall submit a validation report containing details of the
source of the material and associated test results to demonstrate its suitability for
use.
28. Prior to commencement of development on site, an updated noise assessment
shall be submitted to, and approved in writing by the Planning Authority, to
determine the impact of noise on the proposed development. The noise impact
Page 73

Page 74

assessment and any recommendations in respect of mitigation measures shall be
implemented as agreed prior to the development being brought into use and where
appropriate shall be retained in accordance with approved details. The noise
assessment shall include an assessment of aircraft noise taking into account the
structure of the roof design as a possible pathway for noise transmission.
29. Prior to occupation of any house, the applicant shall have a third party independent
verifier submit a verification report which shall provide verification of the installed
noise mitigation measures demonstrating that the projections as detailed within the
approved noise impact assessment are reliable and meet with the relevant
conditions.
30. Prior to the commencement of development on site, a noise control method
statement for the construction period shall be submitted to and approved in writing
by the Planning Authority. This statement shall identify likely sources of noise
(including specific noisy operations and items of plant/machinery), the anticipated
duration of any particularly noisy phases of the construction works, and details of
the proposed means of limiting the impact of these noise-sensitive properties. The
construction works shall thereafter be carried out in accordance with the approved
method statement unless otherwise approved in writing by the Planning Authority.
31. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following
hours unless otherwise first agreed  in writing by the Planning Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
32. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or after
1800, unless otherwise first agreed in writing by the Planning Authority.
33. No piling works shall be carried out until a method statement has been submitted
to and approved in writing by the Planning Authority. This statement shall include
an assessment of the impact of the piling on surrounding properties, taking into
account the guidance contained in BS 6472: 1984 ‘Evaluation of Human Response
to Vibration in Buildings’. It shall detail any procedures which are proposed to
minimise the impact of noise and vibration on the occupants of surrounding
properties. This statement shall be prepared by a suitably qualified person, and the
piling works shall thereafter be carried out in accordance with the approved method
statement.
34. Prior to the commencement of development on site a scheme for the control and
mitigation of dust shall be submitted to and approved in writing by the Planning
Authority. The scheme shall identify likely sources of dust arising from the
development or its construction, and shall identify measures to prevent or limit the
occurrence and impact of such dust. The approved scheme shall thereafter be
implemented fully prior to any of the identified dust generating activities
Page 74

Page 75

commencing on site and shall be maintained thereafter, unless otherwise first
agreed by the Planning Authority. 
35. Prior to the commencement of development on site, an air quality impact
assessment shall be submitted to and approved by the Planning Authority. The
report should use a method based on the principles set out in the Environmental
Protection UK document Development Control: Planning for Air Quality (2010
Update), Scottish Government publication “Local Air Quality Management
Technical Guidance LAQM.TG(09)”, and “Delivering Cleaner Air for Scotland -
Guidance from Environmental Protection Scotland and the Royal Town Planning
Institute Scotland, January 2017”. The recommendations of the assessment shall
be implemented prior to the development commencing on site or within a timescale
agreed by the Planning Authority. 
36.  Prior to the commencement of development on site, details (including specific
luminaire and lamp type; beam control; wattage; the use of reflectors; baffles;
louvers; cowling; lux contours/distribution diagrams and columns types/colours) of
the lights /floodlights have been submitted to and approved in writing by the
Planning Authority. The floodlights shall then be implemented in accordance with
the approved details and shall be maintained in this condition. Any subsequent
changes to their position or specification shall be subject to the prior written
approval of the Planning Authority. 
The applicant should also take cognisance of the nearby commercial premises and
any associated floodlights. The potential for obtrusive light affecting the properties
must be assessed and appropriate mitigation measures put in place to negate any
nuisance from any lights on the commercial premises. 
37.  Prior to the commencement of development on site, details for the storage and the
collection of waste arising from the development shall be submitted to and
approved in writing by the Planning Authority. The agreed details shall be in place
prior the occupation of the first house within the site and thereafter maintained for
the lifetime of the development. 
38. That at all times, during the construction of the development, vehicular and
pedestrian access shall remain available via Abbotsford Road, or any other
equivalent access road, to all existing properties which were, at the time of granting
planning permission, accessed via Abbotsford Road. 
Page 75

Page 76

Pamela Clifford 
Planning, Building Standards and Environmental Health Manager
Date: 17th January 2024 
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager
Pamela.Clifford@west-dunbarton.gov.uk
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Consultation responses
3. Representations
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended
7. Creating Places Guidance (2022)
8. Green Network and Green Infrastructure
Guidance (2022)
9. Clydebank Town Centre Development Framework
2021
Wards affected: Ward 6 (Clydebank Waterfront)
Page 76

Page 77

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 05/03/2024.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:2,500@A405/03/2024
DC23/149/FUL - Location PlanWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
Page 77

Page 78

Page 78

Page 79

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer (Regeneration and Regulatory)
Council: 27 March 2024
Subject: Glasgow City Region City Deal - Update
1. Purpose
1.1 To note the progress with the implementation of the Exxon Infrastructure
Project, and to provide an update on Glasgow City Region City Deal
Programme.
2. Recommendations
2.1 It is recommended that Council notes:
i) The progress of the Glasgow City Region programme
ii) The update on the Exxon Infrastructure Project
3. Background
3.1 The Glasgow City Region City Deal Infrastructure programme equates to
£1.13bn of investment during period 2015-2035. Projects are progressing
and have reached various stages from Strategic, Outline and Full Business
Case stages of approval.
4. Main Issues
4.1 This report provides information on City Region progress, and includes an
update on the Exxon site infrastructure project development.
Exxon Infrastructure Project
4.2 At its meeting in December 2023, Council noted progress made with the
Exxon Infrastructure Project and approved delegated authority to agree the
construction agreements required to deliver the project, subject to the
approval of Planning and the conclusion of land transfers. Planning
permission was granted in January 2024.
4.3 The main construction contract will be signed when all required land
acquisitions and temporary access agreements are concluded. Land
acquisitions are being progressed in line with the terms agreed with
landowners and are anticipated to be complete by the end of March 2024.
4.4 The Esso remediation work is delayed due to newly discovered heavy
contamination pockets on site at close proximity to the water edge. The latest
prediction to complete the work on site is end of April which will be followed
by a 4-6 weeks decommissioning phase. Parallel to this activity the
remediation report approval will be concluded. The estimated earliest land
ITEM 9
Page 79

Page 80

transfer of the formal Esso site is mid-June 2024. 
4.5 The UK Government have recently confirmed to the  Glasgow Region City
Deal Programme Management Office that 50% of the £128m funding that was
to be released as a result of transferring the responsibility of delivery of
Glasgow Airport Rail Link from City Deal to Clyde Metro should be spent on
one new regional project. Prior to this announcement City Region Member
Authorities had anticipated that 100% of the reprogrammed monies would be
available to Member Authorities to meet the increased costs of their City Deal
Infrastructure projects, including Exxon. Consequently, only half of the
anticipated additional funding for the Exxon project will be now available. Each
Member Authority’s share of the funding will be confirmed later in 2024 in
tandem with the selection of the new regional project (refer to paragraph 4.9
for further information). Commencement of works at Exxon will not prejudice
the Council’s claim for additional funding. 
4.6 Decisions on Stage 2 Vacant and Derelict Land funding applications have
been delayed by Scottish Government in order to take stock of the impact of
recent reductions in their capital budget. The Council had submitted a £2m
application for greenspace and access improvements on the Exxon site and
was expected to hear the outcome in January of this year. 
City Region Update 
4.7 The last Glasgow City Region Cabinet Meeting was held on 13 February
2024.  Agenda items included: 
• proposed new Regional Spatial Planning Arrangements
• further information on the City Deal Reprogramming Exercise (referred to
in paragraph 4.5)
• an update on the City Region Investment Zone
• an update on Regional Electric Vehicle Charging. 
4.8 The report on Regional Spatial Planning outlined the proposed process for
agreeing the Regional Spatial Strategy which National Planning Framework 4
(NPF4)  has introduced, and which will replace Clydeplan. The report makes
the case for the Regional Spatial Strategy incorporating the various recent
economic ventures and initiatives, such as Investment Zone. 
4.9 Cabinet heard the process for Member Authorities to submit a proposal for
one new £64m project, or 2-3 smaller projects across Member Authorities
that would fulfil the expectations of UK Government and comply with the City
Deal’s own Assurance Framework. A call for bids with a 12 week turnaround
has been sent to Member Authorities to produce a Strategic Business Case
for eligible projects. Projects must have a regional impact and meet the
objectives of the Regional Economic Strategy. Member Authorities will be
responsible for delivery and managing risk. Programme Management Office
will revert to UK and Scottish Government for further advice if there are no
suitable bids identified following bid submission and assessment. At that
stage a regional programme might be considered but there is no guarantee
this will be acceptable to either or both governments. 
Page 80

Page 81

4.10 Stage 2 bids for the Investment Zone are to be submitted by the end of
March. It’s been confirmed that the funding available, and the timescale for
expenditure, of Investment Zone benefits has doubled to £160m, over 10
years.  The Stage 2 bids are expected to be led by business and/or
universities. The Regeneration and Business Support teams are currently
supporting one bid, and following a call to business via social media, have
responded to other enquiries.   
4.11 The Clyde Bridge contractor maintains a website with regular updates on the
project. A viewer at the top of the website home page shows a video of
progress which is updated monthly. This can be accessed at:
www.graham.co.uk/clyde-waterfront 
5 People Implications 
5.1 There are a number of senior officers involved in the Glasgow City
Region wider programme as identified at City Region Update paper at
Council on 26 August 2021. 
6. Financial Implications 
6.1  Spend this financial year to date on the Exxon project is £2,546,742.  
Overall spend is £6,483,747 
7. Risk Analysis 
7.1 There are a number of project risks associated with the development at
the Exxon project site and these are contained within the project risk
register and updated by the Project Board on a regular basis. The Project
Board is made up of senior officers from all key services. 
8. Equalities Impact Assessment 
8.1 Not relevant for this report 
9. Consultation 
9.1 Consultation with all key stakeholders is progressing as we continue
to work as part of the Glasgow City Region.
10 Strategic Assessment 
10.1 At its meeting on 26 October 2022, the Council agreed that one of its
main strategic priorities for the Strategic Plan 2022 - 2027 is ‘A Strong
local economy and improved employment opportunities’ 
10.2 The proposals within this report are specifically designed to deliver on
this priority. 
Page 81

Page 82

Alan Douglas
Chief Officer: Regulation and Regeneration
Date: 13 March 2024
Person to Contact: Gillian McNamara
gillian.mcnamara@west-dunbarton.gov.uk
Appendix: None
Background Papers: UK Shared Prosperity Fund Report to Housing and
Communities Committee 22 August 2022  
Glasgow City Region City Deal- Council 13 August 2014.
“City Deal Initiative” Clyde Valley Investment Fund-
Council 30 April 2014 (Memorandum of Understanding).
Clyde Valley Community Planning Partnership – City Deal
Initiative – Council 28 August 2013.
Wards Affected: All
Page 82

Page 83

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Council: 27 March 2024
___________________________________________________________________
Subject: Treasury Management Strategy and Annual Investment Strategy
1. Purpose
1.1  The purpose of this report is to seek Council approval of the proposed Treasury
Management Strategy Statement and Annual Investment Strategy and the
indicators contained within.
2. Recommendations
2.1 Council is requested to:
(a) Approve the proposed Treasury Management Strategy Statement and Annual
Investment Strategy and the indicators contained within
(b) Approve the continued use of the asset life method (using either annuity or
equal instalment) for the repayment of loan fund advances with the exception of
spend to save schemes where the funding/income profile method could be
used.
(c) Approve the ability to continue to use countries with a sovereign rating of AA-
and above.
(d) Note the report will be referred to Audit Committee for further scrutiny.
3. Background
3.1 The Council has adopted the Chartered Institute of Public Finance and
Accountancy (CIPFA) Code of Practice on Treasury Management in Local
Authorities. A requirement of the Code is for an annual Treasury Management
Strategy Statement and Investment Strategy to be approved by Council for
the forthcoming financial year. This report seeks Member’s approval of the
proposed Treasury Management Strategy Statement and Annual Investment
Strategy. The report also sets out the policy for the repayment of loans fund
advances for 2024/25.
3.2 The Council uses Link Treasury Services as its external treasury
management advisors. The Council recognises that there is value in
employing external providers of treasury management services in order to
acquire access to specialist skills and resources. The Council will ensure that
the terms of their appointment and the methods by which their value will be
assessed are properly agreed and documented, and subject to regular review.
ITEM 10
Page 83

Page 84

3.3 Appendix 1 and 2 of the attached document outline the Council’s Capital
Prudential and Treasury Indicators which Members are asked to approve as
required by the Local Government (Scotland) Act 1973 (extended via the
Code on the Investments of Money by Scottish Local Authorities (issued on 1
April 2010) under section 40 of the Local Government in Scotland Act 2003.     
3.4 In 2016 new regulations were enacted by the Scottish Parliament, the Local
Authority (Capital Finance and Accounting) (Scotland) Regulations 2016,
under which the Council is required to set out its policy for the statutory
repayment of loans fund advances prior to the start of the financial year as
detailed in section 3 of Appendix 1. The policy on repayment of loans fund
advances in respect of capital expenditure by the Council is to ensure that the
Council makes a prudent provision each year to pay off an element of the
accumulated loans fund advances made in previous financial years. 
.
3.7 The CIPFA Treasury Management Code of Practice requires greater Member
scrutiny of the treasury polices, increased Member training and awareness and
greater frequency of information. One of the key clauses is that a responsible body
is required to ensure effective scrutiny of the treasury management strategy and
polices.  Within West Dunbartonshire Council the body identified to fulfil this role is
the Audit Committee. Therefore the proposed Treasury Management Strategy
Statement and Annual Investment Strategy and the indicators contained within
should be referred to the Audit Committee once approved by Council to ensure
further scrutiny takes place. 
4. Main Issues 
4.1 The Local Government in Scotland Act 2003 requires Council to adopt the
CIPFA Prudential Code and to produce prudential indicators.   Appendix 6 of
this report details the Council’s expected year end indicators for 2024/25,
revises the indicators for 2025/26 to 2027/28 and projects the indicators to
2032/33, with those for the period 2027/28 to 2032/33 being indicative at this
time. 
4.2 Within this overall prudential framework there is a clear impact on the
Council’s treasury management activity, either through borrowing or
investment activity.  As a consequence the treasury management strategy
(which includes details of both debt and investment) for 2024/25 to 2032/33 is
included in Appendix 6 (with the period 2027/28 to 2032/33 being indicative at
this time) to complement the prudential indicators relating to the treasury
activity. 
4.3 Details of the risks, mitigating controls and limits associated with each of the
permitted investment categories are shown in Appendix 3.  Credit rating type
and definitions are attached as Appendix 4 and a list of approved sovereign
countries for investments are attached as Appendix 5. 
Page 84

Page 85

Changes to Financial Regulations – Leasing
4.4 The Treasury Management Strategy report to Council in March 2021 reported
a change to financial regulations regarding leasing. The change was
postponed and is now due to be implemented on 1 April 2024.
4.5 This change brings the assets and future liabilities for all leases onto the
Council’s Balance Sheet from 1 April 2024, which will bring leased assets onto
the balance sheet for the closing of the 2024/25 accounts. The effect of this
change will increase the ‘level of debt’ identified by the Council; the Capital
Financing Requirement; Operational Boundary; and Authorised Limit, by the
future liability of the leased assets. Forecast and estimates of the ratio of
financing costs to Net Revenue Stream may also be affected in future years.
This change affects all councils, though this Council has a low number of
leased assets.
Capital Strategy
4.6 For information, in December 2017, CIPFA issued a revised Prudential Code.
As a result, from 2019/20, all local authorities were required to prepare a
Capital Strategy report, and a revision to the Prudential Code 2021 confirmed
that Local Authorities must produce an Annual Capital Strategy which is
intended to provide the following: 
• a high-level overview of how capital expenditure, capital financing and treasury
management activity contribute to the provision of services
• an overview of how the associated risk is managed
• the implications for future financial sustainability.
4.6.1 The aim of the Capital Strategy report is to ensure that all elected members
fully understand the overall strategy, governance procedures and risk appetite
entailed by the Strategy.
4.6.2 The Capital Strategy for 2024/25 (reported to, and approved by, Council on 6
March 2024) includes capital expenditure, investments and liabilities and
treasury management in sufficient detail to allow all Members to understand
how stewardship, value for money, prudence, sustainability and affordability
will be secured.
5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications arising from this report.
Page 85

Page 86

7. Financial and Procurement Implications 
7.1 The prudential indicators detailed in Appendix 6 show the Council’s likely and
indicative capital financing for the period 2024/25 to 2032/33 while the
treasury management indicators detailed in Appendix 6 show the likely
borrowing requirement for the same period.   
7.2 Table E in Appendix 6 indicates that in each year the gross borrowing
requirement (which includes short term borrowing for cashflow purposes) is
below the capital financing requirement and does not exceed the total of the
CFR in the preceding year plus the estimates of any additional CFR for
2024/25 and following two financial years (Appendix 2 – section 2.1 and 2.2).   
7.3 As a key indicator of prudence this illustrates that the Council only undertakes
long term borrowing for capital purposes and that over the last few years
investment balances have been utilised to fund capital expenditure due to the
concerns over the general economic environment and restricted counterparty
lists. 
7.4 There are no procurement issues arising from this report. 
8. Risk Analysis 
8.1 There are three main risks associated with the formulation of prudential
indicators and the treasury management strategy as detailed in Appendix 1
and 2: 
(a) Capital receipts which affect the capital financing and borrowing requirement
may not materialise and if this occurs then additional borrowing will be
required in order to fund the financing requirement; 
(b) The risk of Counterparties default (i.e. loss of principal sum invested) must
also be taken into account; however the robust controls included within the
investment strategy (Appendix 2 – section 6) will assist in mitigating this risk;
and 
(c) Capital inflation may increase capital expenditure levels, which in turn may
affect the capital financing and borrowing requirement leading to an increase
in borrowing, assuming no additional capital receipts are available.   
(d) Interest rates have increased significantly over the past 18 months and are
subject to further uncertainty.  It was highlighted to Council on the 6th March
that the approved Capital plan was affordable in 2024/25 assuming a
balanced revenue budget was agreed it does create significant pressures on
the revenue budget due to the cost of borrowing as a result of high interest
rates. There is a risk that if interest rates remain higher for longer than
currently forecast.  This will have revenue implications for future years and
these will require to be planned for in the normal manner through long-term
financial strategies and budget planning processes.  This may require the
capital programme to be subject to further review in future years if it is
Page 86

Page 87

deemed to be placing an excessive pressure on the revenue budget and the
sustainability of the Housing Revenue Account (HRA). 
9. Equalities Impact Assessment
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 Legal and Resources have been consulted in relation to this report and
appendices.
12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the 5 strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council.
Laurence Slavin
Chief Officer - Resources
Date:   27 March 2024
Person to Contact: Karen Shannon Church Street, Dumbarton
Email: Karen.Shannon@west-dunbarton.gov.uk
Appendices: 1 Prudential Indicators 2024/25 to 2032/33
2 Treasury Management Strategy 2024/25 to 
2032/33
3 West Dunbartonshire Council and Common Good
Funds Permitted Investments, Associated Controls
and Limits
4 Counterparty Rating Explanations
5 Approved Countries for Investment
6 Prudential and Treasury Indicators
Background Papers: 2024/25 Budget Report – Council 6 March 2024
Treasury Management Strategy – Council 29 March 2023
Treasury Mid-year update – Council 20 December 2023
Wards Affected: All wards affected.
Page 87

Page 88

Appendix 1 
Capital Prudential Indicators 2023/24 to 2032/33 
1. Capital Expenditure and Financing 
1.1 This prudential indicator is a summary of the Council’s capital expenditure plans, both those
agreed previously, and those forming part of the 2024/25 budget setting. The Council’s gross
capital expenditure plans are summarised in Table A within Appendix 6. This forms the first of
the prudential indicators.  Total expenditure is partially funded by resources such as capital
receipts, capital grants, etc.  Any remaining expenditure which cannot be immediately funded
from other resources will form a borrowing need. 
1.2 A certain level of capital expenditure will be supported by the general capital grant provided by
the Scottish Government, and also specific capital grants from the Scottish and UK
Governments. Anything above this level will be funded from the Council’s own resources (e.g.
other grants, capital receipts, prudential borrowing). 
1.3 There are two main limiting factors which may impact on the Council’s ability to undertake
unsupported capital expenditure: 
• Whether the revenue resource is available to support the implications of capital
expenditure (borrowing costs and running costs). 
• The Government may use a control to limit either the total of all councils’ plans nationally,
or in the event of an assessment by central government that local plans are unaffordable
at a specific council, it may implement a local control.  No such control has been
implemented since the inception of the prudential code, however, HM Treasury keep this
under review. 
1.4 The summary of capital expenditure, as per the capital plan reported to Council on 6 March
2024 for both HRA and General Services, is shown in table A in Appendix 6.  The HRA capital
plan refresh extends to 2028/29 with the period from 2028/29 to 2032/33 extracted from the
HRA Business Plan for the purposes of Prudential Indicator calculations. 
1.5 Under section 22 of Schedule 3 of the Local Government (Scotland) Act 1975 a local authority
may establish a capital fund to be used for “defraying any expenditure of the authority to which
capital is properly applicable, or in providing money for repayment of the principal of loans (but
not any payment of interest on loans)”.  Furthermore paragraph 24 of Finance Circular 7/2018
confirms that capital receipts may also be used to “fund the cost of premiums, either as they
are incurred, or as they are recharged back to the General Fund/ HRA” 
1.6 The capital plan update for General Services reported to Council assumes an element of
capital receipts is used to fund the principal element of loan charges and annual premium
costs between 2023/24 and 2026/27. This has been adjusted for within these indicators,
where appropriate. 
2. The Council’s Borrowing Need (the Capital Financing Requirement) 
2.1 The second prudential indicator is the Council’s Capital Financing Requirement (CFR).  The
CFR is simply the total outstanding capital expenditure which has not yet been paid for from
either revenue or capital resources.  It is a measure of the Council’s underlying borrowing
Page 88

Page 89

need.  The net capital financing need (as indicated in Table A in Appendix 6) impacts directly
on the CFR.  
2.2 Due to accounting requirements, the CFR currently includes any other long-term liabilities (i.e.
PPP schemes, PPI schemes, finance leases) brought onto the Balance Sheet.  Whilst this
increases the CFR, and therefore the Council’s borrowing requirement, these types of scheme
include a borrowing facility and so the Council is not required to separately borrow for these
schemes.  The Council currently has circa £90m for PPP schemes and leases within the CFR.
From 1 April 2024, further accounting changes see operational leases (where the Council is
lessee) also being brought onto Balance Sheet, which will further increase CFR through other
long-term liabilities (value to be confirmed, however an estimate has been included within the
appendices).
2.3 The CFR projections for both General Services and HRA are shown in table B in Appendix 6
and show that the CFR for the HRA and the CFR for General Services is projected to increase
each year from 2022/23 to 2032/33 
2.4 The expected impact of the capital expenditure decisions above on the Council’s debt and
investment position are shown in the treasury strategy (Appendix 2). 
3. Statutory repayment of loans fund advances
3.1 The Council is required to set out its policy for the statutory repayment of loans fund advances
prior to the start of the financial year. The repayment of loans fund advances ensures the
Council makes a prudent provision each year to pay off an element of the accumulated loans
fund advances made in previous financial years.  
3.2 A variety of options are provided to councils so long as a prudent provision is made each year
as detailed below:
Option Method Detail
1 Statutory Loans fund advances will be repaid by the annuity
method.  The Council was permitted to use this option
for a transitional period only, of five years until 31 March
2021, at which time it was required to change its policy
to use alternative approaches based on depreciation,
asset life periods or a funding/income profile as detailed
below.
2 Depreciation Annual repayment of loans fund advances will follow
standard depreciation accounting procedures.
3 Asset Life Loans fund advances will be repaid with reference to the
life of an asset using either the equal instalment or
annuity method.
4 Funding/ Income
Profile
Loans fund advances will be repaid by reference to an
associated income stream
3.3 Council is recommended to approve the following policy for loans fund advances:
• For loans fund advances made before 1 April 2016, advances will be repaid by the annuity
method, by the appropriate write off period (based upon useful asset lives, following the
agreed Council policy).
Page 89

Page 90

• Recognising that the Council had forward capital expenditure plans and was already
committed to that plan and the revenue implications of that plan, the policy for loans fund
advances made from 1 April 2016 to 31 March 2021 was to mainly repay loans fund
advances by the annuity method (with a write off period based upon useful asset lives)
unless an alternative method is more appropriate.   
• For loans fund advances made after 1 April 2021 (i.e. commencing 2021/22), the policy for
the repayment of loans advances is to apply the following options, selecting the most
suitable method for each individual advance. 
o Asset life method – loans fund advances will be repaid with reference
to the life of an asset using either the equal instalment or annuity
method.  It is likely that the equal instalment method will be used.  
o Funding / Income profile method – loans fund advances will be repaid
by reference to an associated income stream. 
3.4 The annuity rate applied to the loans fund repayments is based on historic interest
rates and is currently 9%. 
3.5 Table C in Appendix 6 details the loans fund repayment profile for 2023/24 onwards
based on the balance outstanding at 1 April 2023 and capital expenditure plans
2023/24 to 2032/33 as per Table A.    
4. Affordability Prudential Indicators 
4.1 The previous sections cover the overall capital and control of borrowing, but within this
framework prudential indicators are required to assess the affordability of the capital
investment plans.   These indicate the impact of the capital investment plans on the overall
Council’s finances.  The Council is asked to approve the following indicators: 
4.2 Actual and Estimates of the ratio of financing costs to net revenue stream.  This indicator is
detailed in Table D in Appendix 6, and identifies the trend in financing cost of capital (loan
charges and long-term liability financing) against the net revenue stream (funding sources e.g.
Scottish Government revenue support grant, council tax and HRA rental income).   
The estimates of financing costs include current commitments and the impact of capital
expenditure as per Table A and this indicator shows the percentage of total council revenue
expenditure that is spent on repayment of loan charges and long-term liability capital and
interest repayments. 
5. Financial reporting changes in relation to leases 
5.1 From 1 April 2024 there is a significant change to the Accounting Code of Practice
which the Council follows for their Financial Statements, which will impact on debt
levels and prudential indicators in the future. This change is in relation to assets the
Council leases in. 
5.2 Currently there are two types of leases which are treated differently through the
Financial Statements. From April 2024, all leases (where the Council is lessee and
with a few exceptions) will require to be accounted for on the Council Balance Sheet
as assets. For illustrative purposes, leases currently held by the Council (but not
owned and therefore not currently on the Council’s Balance Sheet) include leases for
properties (such as Aurora/ Clydebank Town Centre Office/ Bridge Street),
Page 90

Page 91

photocopiers, and vehicles. The treatment of these leases will become similar to the
current accounting reporting for PPP assets.
5.3 Accounting for these leases on the Balance Sheet will result in increases to assets and long-
term liabilities, affecting a number of the prudential and treasury management indicators –
increasing: the ‘level of debt’ identified by the Council; the Capital Financing Requirement;
Operational Boundary; and Authorised Limit, by the value of the leases. Forecast and
estimates of the ratio of financing costs to Net Revenue Stream may also be affected. 
5.4 We have carried out an exercise is underway to identify all leases and values for both the
assets and the liabilities. When leases are brought on balance sheet in 2024/25 this has
resulted in an increase in the CFR of £2.159m.   
Page 91

Page 92

Appendix 2 
Treasury Management Strategy 2023/24 – 2032/33 
1. Background 
1.1 The treasury management service is an important part of the overall financial management of
the Council’s affairs.  Whilst the prudential indicators in Appendix 1 consider the affordability
and impact of capital expenditure decisions, the treasury service covers the effective funding
of these decisions.  There are specific treasury prudential indicators included in this strategy
which need approval. 
1.2 The Council’s treasury activities are strictly regulated by statutory requirements and a
professional code of practice (the CIPFA Code of Practice on Treasury Management). 
1.3 As a requirement of the Code Council is required to adopt a Treasury Management Policy
Statement and four Treasury Management clauses.  These form part of the Council’s financial
regulations and the following documents were adopted on 5 March 2018: 
• Treasury Management Policy Statement
• Treasury Management Clauses
• The Treasury Management Role of the Section 95 Officer 
1.4 The policy requires an annual strategy to be reported to Council outlining the expected
treasury activity for the forthcoming three years, however in line with the longer capital
planning process treasury management indicators have been provided (where appropriate)
covering the period to 2032/33.  A key requirement of this report is to explain both the risks,
and the management of the risks, associated with the treasury service.  Further reports are
issued as follows: 
• Mid-year monitoring report on actual activity during the year including revised indicators
where appropriate.
• Year-end report on actual activity for the previous year.
• Updates as part of the capital BCR. 
1.5 This strategy covers: 
• The Council’s debt and investment projections
• Limits to the Council’s borrowing activity
• The economic climate and expected movement in interest rates
• The Council’s borrowing, debt and investment strategies
• Treasury performance indicators
• Specific limits on treasury activities
• Policy on ethical investments. 
2. The Council’s debt and investment projections 
2.1 The Council’s forecast treasury portfolio position at 31 March 2024 with forward projections
are summarised in Table E in Appendix 6 and shows the gross debt (the treasury
management operations), against the underlying capital borrowing need (the Capital
Financing Requirement - CFR), highlighting any under or over borrowing.   
Page 92

Page 93

2.2 Within the prudential indicators there are a number of key indicators to ensure the Council
operates its activities within well defined limits.  One of these is that the Council needs to
ensure that its gross debt does not, except in the short term, exceed the total of the CFR in the
preceding year plus the estimates of any additional CFR within the following two financial
years.  This allows some flexibility for limited early borrowing for future years, but ensures that
borrowing is not undertaken for revenue purposes.  This is illustrated by comparing the
estimated gross debt as at 31 March 2024 with the CFR as at 31 March 2027. 
2.3 The Section 95 Officer (Chief Officer - Resources) reports that the Council has
complied with this prudential indicator, and no difficulties are envisaged for the current
or future years.  This view takes into account the capital plan refresh reports for General
Services and HRA. 
3. Limits to Borrowing Activity 
3.1 The Operational Boundary is detailed in Table F in Appendix 6 and is the limit beyond which
external debt is not normally expected to exceed.  In most cases, this would be a similar figure
to the CFR, but may be lower or higher depending on the levels of actual debt.   
3.2 The Authorised Limit for External Borrowing – This is a key prudential indicator and
represents a control on the maximum level of borrowing. This represents a legal limit beyond
which external debt is not allowed to exceed.  This needs to be set or revised by Members.  It
reflects the level of external debt which, while not desired, could be afforded in the short term,
but is not sustainable in the longer term.  This is the statutory limit (Affordable Capital
Expenditure Limit) determined under section 35(1) of the Local Government in Scotland Act
2003. The Government retains an option to control either the total of all councils’ plans, or
those of a specific council, although this power has not yet been exercised.  The Council is
asked to approve the authorised limit detailed in Table G in Appendix 6. 
3.3 Policy on borrowing in advance of need - This Council will not borrow more than or earlier
than required purely in order to profit from the investment return of the extra sums borrowed. 
Any decision to borrow in advance will be within forward approved Capital Financing
Requirement estimates, and will be considered carefully to ensure that value for money can
be demonstrated and that the Council can ensure the security of such funds. Risks associated
with any borrowing in advance activity will be subject to prior appraisal and subsequent
reporting through the mid-year or annual reporting mechanism. 
4. UK, World and Scottish Economy Update – Extraction from Link Treasury Advisor
Reports (January 2024) and the Scottish Fiscal Commission Forecast (December 2023). 
4.1 UK 
The run of softer than expected news on CPI Inflation and wage growth means
analysts now expect the Bank of England to cut interest rates sooner than before.
Forecasters expect rates will be cut from 5.25% in June and will fall to 3.00% in
2025. 
The recent fall in mortgage rates means total household payments may not rise by as
much as analysts thought. The economic recovery may start earlier and be a bit
stronger. 
Unemployment rates stayed at 4.2% in November, the further fall in the job vacancy
rate is consistent with wage growth slowing from 6.6% in October to 3.5% by the
middle of this year.
Page 93

Page 94

The bigger than expected fall in CPI inflation to 3.9% in November means that the
UK is no longer a big international inflation outlier. 
4.2    US 
PCE (Personal Consumption Expenditure) inflation is expected to return to 2% by
middle of 2024 and analysts expect rates to fall between 3.00% and 3.25% in early
2025. The lagged impact of previous monetary policy tightening will continue to feed
through the next few quarters, but forecasters do expect the economy to avoid a
recession and rate cuts should fuel a pick up in GDP growth. 
4.3    EU 
The Eurozone will remain in or close to recession in the first half of 2024 as the effects
of higher interest rates continue to weigh on household consumption and investment.
Headline inflation has already dropped sharply and will be close to the ECB’s
(European Central Bank)2% target for most of 2024. 
4.4    China 
China’s economy has regained some strength recently and analysts expect this to
continue throughout 2024, on the back of support from fiscal policy and a further pick
up in household spending. Property construction is likely to continue to decline along
with exports and the recovery will lack momentum. 
4.5    Japan 
The recent sharp fall in Japan’s ratio of public debt to GDP reflects one off factors that   
will not be sustained. Whilst the influence of rising bond yields on the trajectory of the
public finances will largely be offset by higher inflation and nominal GDP growth, the
Government will need to reduce its primary budget deficit sharply to prevent the public
debt ratio from creeping higher again. Analysts now believe that inflation will ultimately
reach 2% on a sustained basis, forcing the Bank of Japan to lift its policy rate to 2% as
well. This in turn suggests that bond yields will rise further too. 
6       Scotland Specific 
The outlook for the Scottish economy and for living standards (as measured by real
disposable income per person) is largely unchanged from our December 2022 and
May 2023 forecasts, with a slightly less negative picture for 2023-24 compared to a
year ago. For 2023-24, back in May, we forecast Gross Domestic Product (GDP) to
remain stable rather than fall into the shallow recession we had predicted in December
2022, and this coincided with less of a fall in living standards. Since May, reflecting
stronger nominal earnings growth than anticipated, we have further revised up our
forecast of real disposable income per person although we still expect a small fall this
year. The drop in living standards between 2021-22 and 2023-24, of 2.7 per cent, is
still the largest reduction since Scottish records began in 1998. Living standards will
take until 2026-27 to return to their level. 
Page 94

Page 95

For 2024-25, we forecast slow and fragile growth in GDP and real disposable income
per person, as the recent rises in interest rates continue to weigh on household
incomes and the economy, with inflation also likely to stay higher for longer than we
assumed previously. 
We forecast living standards to remain broadly flat in 2024-25 as inflation will largely
offset growth in nominal household disposable income. Higher interest rates will
continue to reduce disposable income over the next year.6 In part, this is because the
widespread use of fixed-rate mortgages means that the recent rises in interest rates
are passing through to mortgage costs with a longer lag than in the past. 
The forecast for inflation is higher and more persistent than last December. We do
not expect the Bank of England’s target of 2 per cent to be met until the second
quarter of 2025, after which the outlook is relatively stable. 
Due to strong earnings growth, we have revised up our forecast of real disposable
income per person. Despite this, the drop between 2021-22 and 2023-24 is the
largest reduction in living standards since Scottish records began in 1998.
5. Prospect for Interest Rates
5.1 The Council has appointed Link Asset Services as its treasury advisor and part of their service
is to assist the Council to formulate a view on interest rates. Table H in Appendix 6 gives the
current Link Asset Services central view. 
6. Borrowing and Debt Strategy 2024/25 – 2032/33
6.1 Table E in Appendix 6 forecasts that the capital borrowing need (the Capital Financing
Requirement) will be almost fully funded with external borrowing which is a mixture of
short term and long term debt.
6.2 Against this background and the risk within the economic forecast, caution will be
adopted with the 2024/25 treasury operations.  The Section 95 Officer will monitor
interest rates in financial markets and adopt a pragmatic approach to changing
circumstances. 
6.3 If it was felt that there was a significant risk of fall in long and short term rates, e.g. due
to a marked increase of risks around recession or of risks of deflation, then long term
borrowing will be postponed, and potential rescheduling from fixed rate funding into
short term borrowing will be considered.
6.4 If it was felt that there was a significant risk of a much sharper rise in long and short
term rates than that currently forecast, perhaps arising from a greater than expected
increase in world economic activity or further increases in inflation risks, then the
portfolio position will be re-appraised with the likely action that fixed rate funding will be
drawn whilst interest rates were still relatively cheap. 
6.5 Any decisions will be reported to Members via the Members Bulletin at the next available
opportunity.
6.6 Approved sources of long and short term borrowing include:
Page 95

Page 96

Fixed Variable
PWLB X X
Local Authorities X X
Banks X X
Pension Funds X X
Insurance Companies X X
Market – long term X X
Market – short term X X
Market – LOBOs X X
Overdraft X X
Internal (capital receipts / revenue balances) X X
Finance Leases X X 
7. Investment Strategy 
7.1 The Council’s investment policy has regard to the Local Government Investment (Scotland)
Regulations (and accompanying finance circular).  Council has also adopted both the
Treasury Management Code of Practice and the Prudential Code and is required to adopt
revised editions.  The day to day investment policies and practices are contained in the
Council’s Treasury Management Practices, which reflect the requirements of these codes.   
7.2 Key Objectives – Following the economic background above, the current investment climate
has one over-riding risk consideration - counterparty security risk.  As a result of these
underlying concerns, officers have implemented an operational investment strategy which
prioritises security first, liquidity second and then return. 
7.2.1 The Council has adopted a prudent approach to managing risk and defines its risk appetite by
the following means: 
• Minimum acceptable credit criteria are applied in order to generate a list of highly
creditworthy counterparties. This also enables diversification and thus avoidance of
concentration risk. The key ratings used to monitor counterparties are the short term and
long-term ratings. 
• Other information: ratings will not be the sole determinant of the quality of an institution; it is
important to continually assess and monitor the financial sector on both a micro and macro
basis and in relation to the economic and political environments in which institutions
operate. The assessment will also take account of information that reflects the opinion of the
markets. To achieve this consideration the Council will engage with its advisors to maintain
a monitor on market pricing such as “credit default swaps” and overlay that information on
top of the credit ratings. 
• Other information sources used will include the financial press, share price and other such
information pertaining to the financial sector in order to establish the most robust scrutiny
process on the suitability of potential investment counterparties. 
• The Council has defined the list of types of investment instruments that the treasury
management team are authorised to use. 
• Transaction limits are set for each type of investment. 
• All investments will be denominated in sterling. 
Page 96

Page 97

7.2.2 The aim of the strategy is to generate a list of highly creditworthy counterparties which will
enable diversification, and thus avoidance of concentration, with the prime intention of
providing security of investment and minimisation of risk.
7.3 Investment Strategy – The process for investment strategy under the regulations covers a
wide range of Council investments and will be broadly managed in the following way:
• Short Term Cash – Cash relating to day to day cash flow will be maintained on a shorter
term basis in cash type products with consideration to  liquidity requirements.
• Longer Term Cash – Cash relating to reserves, provisions and balances on the balance
sheet may be held for longer periods of time in cash type products or in longer term bonds
or funds depending on:
▪ cash flow requirements
▪ the underlying expectation for interest rates
▪ the economic background of these investments may be held longer term.
• Service Type Investments – These will predominantly be policy driven and approved by
Members.  Shareholdings, development opportunities, loans to third parties, equity
instruments and investment properties held for rental returns will be regularly reviewed to
judge the investment performance.
• Non Service Type Investments – Investments such as Joint venture delivery companies
such as Hub West Scotland and investments in regeneration partnerships and development
opportunities.
7.4 Benchmarking and Monitoring Security, Liquidity and Yield in the Investment Service
A development for Member reporting is the consideration and approval of security, liquidity
and discreet benchmarks.  Yield benchmarks are currently widely used to assess investment
performance.  
7.4.1 These benchmarks are targets (not limits) and so may be breached from time to time,
depending on movements in interest rates and counterparty criteria.  The purpose of the
benchmark is that officers will monitor the current and trend position and amend the
operational strategy depending on any changes.  Any breach of the benchmarks will be
reported, with supporting reasons in the Mid-Year or Annual Report.
7.4.2 In the context of benchmarking, assessing security is a very subjective area to assess.
Security is currently evidenced by the application of minimum quality criteria to investment
counterparties, primarily through the use of credit ratings supplied by the three main credit
rating agencies (Fitch/ Moody’s and Standard and Poors).  Whilst this approach embodies
security considerations, benchmarking levels of risk is more problematic.  One method to
benchmark security risk is to assess the historic level of default against the minimum criteria
used in the Council’s investment strategy.  Table I in Appendix 6 shows average defaults for
differing periods of investment grade products for each Fitch/ Moody’s Standard and Poors
long term rating category.  
7.4.3 The Council’s minimum long term rating criteria is currently “A-”, meaning the average
expectation of default for a one year investment in a counterparty with a “A” long term rating
would be 0.05% of the total investment (e.g. for a £1m investment the average loss would be
Page 97

Page 98

£500).  This is only an average - any specific counterparty loss is likely to be higher - but
these figures do act as a proxy benchmark for risk across the portfolio. 
7.4.4 As required by the CIPFA Treasury Management Code of Practice The Council will “ensure
that it has adequate, though not excessive, cash resources, borrowing arrangements,
overdrafts or standby facilities to enable it at all times to have the level of funds available to it
which are necessary for the achievement of its business/service objectives”.  In respect to
liquidity as defined above the Council seeks to maintain: 
• Bank overdraft - £1m
• Liquid short term deposits of at least £5m available on an overnight basis. 
7.4.5 Local measures of yield investment benchmarks that will be used to assess returns are: 
Benchmark Benchmark
Return 
Average
Return
Compound 12 month SONIA* 4.71% 4.92%
Council’s Instant Access Account 5.15% 4.92%
* SONIA is Sterling Overnight Index Average and has replaced LIBOR & LIBID 
7.5  Council Permitted Investments – The Investments Regulations (Code on the Investment of
Money by Scottish Local Authorities) requires Council approval of all the types of investment
to be used and set appropriate limits for the amount that can be held for each investment type. 
These types of investment are termed permitted investments and any investments used which
have not been approved as a permitted investment will be considered ultra vires. 
7.5.1 The permitted investments which may be used in the forthcoming year are noted below. 
Details of the risks, mitigating controls and limits associated with each of these permitted
categories are shown in Appendix 3. 
• Cash Type Instruments 
▪ Deposits with the Debt Management Account Facility (UK Government)
▪ Deposits with other local authorities or public bodies
▪ Money Market Funds
▪ Call accounts, deposit accounts with financial institutions (banks and building
societies
▪ Term deposits with financial institutions (banks and building societies)
▪ UK Government Gilts and Treasury Bills
▪ Certificates of deposits will financial institutions (banks and building societies)
▪ Structured deposit facilities with banks and building societies (escalating
rates, de-escalating rates, etc). 
• Other Investments 
▪ Investment properties
▪ Loans to third parties, including soft loans
▪ Loans to a local authority company
▪ Shareholding in a local authority company
▪ Non-local authority shareholdings
▪ Joint venture delivery companies such as Hub West Scotland
▪ Regeneration partnerships and development opportunities 
▪ District Heating Schemes
Page 98

Page 99

▪ Local Authority Mortgage Scheme (LAMS). 
7.5.2 Permitted investments related to the Common Good are also shown in Appendix 3, and where
applicable the same counterparty selection criteria as noted in 6.6 below will be applied. 
7.6 Investment Counterparty Selection Criteria 
The primary principle governing the Council’s investment criteria is the security of its
investments, although the yield or return on the investment is also a key consideration.  After
this main principle the Council will ensure: 
• It maintains a policy covering both the categories of investment types it will invest in,
criteria for choosing investment counterparties with adequate security, and monitoring their
security. 
• It has sufficient liquidity in its investments.  For this purpose it will set out procedures for
determining the maximum periods for which funds may prudently be committed.  These
procedures also apply to the Council’s prudential indicators covering the maximum
principal sums invested.   
7.6.1 The Section 95 Officer will maintain a counterparty list in compliance with the following criteria
and will revise the criteria and submit them to Council for approval as necessary.  This criteria
selects which counterparties the Council will choose from, rather than defining what its
investments are.   
7.6.2 Credit rating type and definitions are attached within Appendices 4 and 6. 
7.6.3 Credit rating information is supplied by our treasury consultants on all active counterparties
that comply with the criteria below.  Any counterparty failing to meet the criteria would be
omitted from the counterparty (dealing) list.  Any rating changes, rating watches (notification of
a likely change), rating outlooks (notification of a possible longer term change) are provided to
officers almost immediately after they occur and this information is considered before dealing. 
For instance a negative rating watch applying to any counterparty at the minimum Council
criteria will be suspended from use, with all others being reviewed in light of market
conditions. 
7.6.4 The criteria for providing a pool of high quality cash type investment counterparties is: 
• Category 1 - Good Credit Quality – the Council will only use financial institutions
(including certificates of deposit and corporate bonds) which: 
▪ Are UK banks; and/or
▪ Are non-UK and domiciled in a country which has a minimum Sovereign long
term rating of AA; The UK will be excluded from any Sovereign rating criteria.
▪ And have, as a minimum, the following Fitch, Moody’s and Standard and
Poors (S&P) credit ratings (where rated):
o Short Term – F1 (or equivalent from Fitch, Moody’s and S&P) 
o Long Term – A- (or equivalent from Fitch, Moody’s and  S&P) 
The difference between the ratings will be reflected in the money limits as noted
in Table K in Appendix 6. 
Page 99

Page 100

• Category 2 – Part nationalised UK banks –Royal Bank of Scotland Group. These banks
can be included if they continue to be part nationalised or they meet the ratings in
Category 1 above. 
• Category 3 - The Council’s own banker for transactional purposes if the bank falls below
the above criteria specified in category 1, although in this case balances will be minimised
in both monetary size and time. 
• Category 4 - Bank Subsidiary and Treasury Operations – the Council will use these
where the parent bank has the necessary ratings outlined in category 1. 
• Category 5 - Building Societies – the Council will use all Societies which meet the
ratings for banks outlined in category 1. 
• Category 6 - Money Market Funds – the Council will use either Constant Net Asset
Value (CNAV) or Low Volatility Net Asset Value (LVNAV) money market funds that are
AAA rated (by at least one of the 3 rating agencies) 
• Category 7 - UK Government (including gilts, treasury bills and the Debt Management
Account Deposit Facility (DMADF/HM Treasury) 
• Category 8 - Local Authorities, etc 
7.6.5 Due to the uncertainty in the financial markets it is recommended that the Investment Strategy
is approved which will provide officers with the flexibility to deal with any unexpected
occurrences.  Officers can restrict the pool of available counterparties from these criteria to
safer instruments and institutions. 
7.6.6 The time limits for institutions on the Council’s cash type counterparty list are as noted in
Table J in Appendix 6. 
7.6.7 The Council’s bankers are currently Virgin Money (previously known as the Clydesdale Bank
Plc) which falls within Category 3.  It is recognised that the money limit of £5million may be
breached for purely operational purposes on a temporary overnight basis only.  The Chief
Officer - Resources will endeavour to avoid this scenario but this allows for circumstances that
are outwith the Council’s control where funds may be deposited unexpectedly or at short
notice into the Council’s accounts after the dealing deadline for the day has passed.  In such a
circumstance the funds will require to be kept on an overnight basis in the Council’s bank
account until appropriate arrangements can be made for investment. 
7.6.8 Table J does not include a monetary limit for category 7 which are funds deposited with the
UK Government namely the DMADF.  This facility allows local authorities to deposit surplus
cash on flexible terms and receive a market related rate of interest.  Funds are held by the
Bank of England and the scheme carried the Government’s own sovereign credit rating
offering the highest available security and therefore no maximum monetary limit has been set. 
7.6.9 Country and sector considerations - Due care will be taken to consider the country, group
and sector exposure of the Council’s investments.  In part the country selection will be chosen
by the credit rating of the Sovereign state in Banks 1 above and the list of approved countries
for investments are detailed in Appendix 5.  In addition: 
• No more than 25% will be placed with any country outside of the UK at any time
• Limits in place above will apply to Group companies
Page 100

Page 101

• Sector limits will be monitored regularly for appropriateness.
7.6.10 Use of additional information other than credit ratings – Additional requirements under
the Code of Practice now requires the Council to supplement credit rating information.  Whilst
the above criteria relies primarily on the application of credit ratings to provide a pool of
appropriate counterparties for officers to use, additional operational market information will be
applied before making any specific investment decision from the agreed pool of
counterparties.  This additional market information (for example Credit Default Swaps,
negative rating watches/outlooks) will be applied to compare the relative security of differing
investment counterparties.
7.6.11 Economic Investment Considerations – Current forecasts on shorter-term interest rates,
on which investment decisions are based, show a potential for the current 5.25% Bank Rate to
continue to slowly decrease.  The Council’s investment decisions are based on comparisons
between the rises priced into market rates against the Council’s and advisers own forecasts.   
7.6.12 There is an operational difficulty arising from the current economic situation. There is
currently little value investing longer term unless credit quality is reduced.  Whilst some
selective options do provide additional yield uncertainty over counterparty creditworthiness
suggests shorter dated investments would provide better security.
7.6.13 The criteria for choosing counterparties set out above provide a sound approach to
investment in “normal” market circumstances.  Whilst Members are asked to approve this
base criteria above, under the exceptional current market conditions the Section 95 Officer
(Chief Officer - Resources) may temporarily restrict further investment activity to those
counterparties considered of higher credit quality than the minimum criteria set out for
approval.  These restrictions will remain in place until the banking system returns to “normal”
conditions.  Similarly the time periods for investments will be restricted.
7.7 Sensitivity to Interest Rate Movements - Whilst most of the risks facing the treasury
management service are addressed elsewhere in this report (credit risk, liquidity risk, market
risk, maturity profile risk), the impact of interest rate risk is discussed but not quantified.  
Table K in Appendix 6 highlights the estimated impact of a 1% increase/decrease in all
interest rates to the estimated treasury management costs/income for next year.  That
element of the debt and investment portfolios which are of a longer term, fixed interest rate
nature will not be affected by interest rate changes.
7.8 Ethical Investments - This is the placing of funds and selecting investments in a
manner that reflects an authority’s ethical values. Generally, two sets of criteria are
drawn up – negative and positive values whereby investments are to be avoided or
encouraged. 
7.8.1 The following policy statement was approved on 25 October 2017:
7.8.2  The Council will not knowingly invest directly in organisations (including financial
institutions and money market funds) whose activities and practices pose a risk of
serious harm to individuals and/or groups, or whose activities are inconsistent with
the Council’s vision, values and priorities.  This could include avoiding direct
investment in organisations with material links to:
• Human rights abuse (e.g. child labour)
• Environmentally harmful activities (e.g. destruction of habitat)
• Socially harmful activities (e.g. gambling).
Page 101

Page 102

7.8.3  In order to give effect to its commitment to this policy the Chief Officer - Resources
contacted all investment counterparties on 9 January 2018 advising of our policy.
7.8.4  In accordance with the further commitments that were given in October 2017 it is
considered that this policy statement remains relevant and does not require to be
amended at this time.
8. Treasury Management Limits on Activity
8.1 There are four further treasury activity limits, which were previously prudential indicators.  The
purpose of these prudential indicators is to contain the activity of the treasury function within
certain limits, thereby managing risk and reducing the impact of an adverse movement in
interest rates.  However, if these are set to be too restrictive they will impair the opportunities
to reduce costs.  
• Upper limits on variable interest rate exposure – This indicator identifies a maximum limit
for variable interest rates based upon the debt position net of investments
• Upper limits on fixed interest rate exposure – Similar to the previous indicator this covers a
maximum limit on fixed interest rates.
• Maturity structures of borrowing – These limits are set to reduce the Council’s exposure to
large fixed rate sums falling due for refinancing, and are required for upper and lower
limits.
• Total principal funds invested for greater than 364 & 365 days - These limits are set with
regard to the Council’s liquidity requirements and to reduce the need for early sale of an
investment, and are based on the availability of funds after each year-end.
The proposed indicators are shown within Table L in Appendix 6.
9. Performance Indicators
9.1 The Code of Practice on Treasury Management requires the Council to set performance
indicators to assess the adequacy of the treasury function over the year.  These are distinct
historic indicators, as opposed to the prudential indicators, which are predominantly forward
looking.  Examples of performance indicators often used for the treasury function are:
• Debt – Borrowing - Average rate of borrowing for the year compared to average available
• Debt – Average rate movement year on year
• Investments – Internal returns above the 7 day SONIA rate.
9.2 The results of these indicators will be reported in the Treasury Annual Report for 2023/24.
10. Treasury Management Advisors
10.1 The Council uses Link Asset Services as its treasury management advisors.  The company
provides a range of services which include:
• Technical support on treasury matters, capital finance issues and the drafting of Member
reports
Page 102

Page 103

• Economic and interest rate analysis
• Debt services which includes advice on the timing of borrowing
• Debt rescheduling advice surrounding the existing portfolio
• Generic investment advice on interest rates, timing and investment instruments
• Credit ratings/market information service comprising the three main credit rating agencies. 
10.2 The current treasury advisor contract was awarded to Link Asset Services following a quick
quote exercise and commencing on 1 May 2021 until 30 April 2023, with an option to extend
for one year. This option was recently agreed with the contract now due to terminate on the
30th April 2024. Officers are actively reviewing the treasury advisor contract and are reviewing
options to secure best value for the Council. 
10.3 The Council recognises that responsibility for treasury management decisions remains with
the organisation at all times and will ensure that undue reliance is not place upon external
service providers. 
10.4 The Council also recognises that there is value in employing external providers of treasury
management services in order to acquire access to specialist skills and resources.  The
Council will ensure that the terms of their appointment and the methods by which their value is
assessed are properly agreed and documented, and subjected to regular review. 
10.5 Whilst the advisers provide support to the internal treasury function the final decision on
treasury matters remains with the Council.   
11. The Monitoring of Investment Counterparties 
11.1 The credit rating of counterparties will be monitored regularly.  The Council receives credit
rating information (changes, rating watches and rating outlooks) from Link Asset Services as
and when ratings change, and counterparties are checked promptly.  On occasion ratings may
be downgraded when an investment has already been made.  The criteria used are such that
a minor downgrading should not affect the full receipt of the principal and interest.  Any
counterparty failing to meet the criteria will be removed from the list immediately by the Chief
Officer - Resources and, if required, new counterparties which meet the criteria will be added
to the list. 
Page 103

Page 104

Appendix 3
West Dunbartonshire Council and Common Good Funds Permitted Investments,
Associated Controls and Limits
Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Cash Type Instruments
Deposits with
the Debt
Management
Account Facility
(UK
Government)
(Very low risk)
This is a deposit with the
UK Government and as
such counterparty and
liquidity risk is very low, and
there is no risk to value. 
Deposits can be between
overnight and 6 months.
Little mitigating controls
required.  As this is a UK
Government investment the
monetary limit is unlimited to
allow for a safe haven for
investments.
As shown in
Table J.
Deposits with
other local
authorities or
public bodies
(Very low risk)
These are considered quasi
UK Government debt and
as such counterparty risk is
very low, and there is no
risk to value.  Liquidity may
present a problem as
deposits can only be
broken with the agreement
of the counterparty, and
penalties can apply.
Deposits with other non-
local authority bodies will
be restricted to the overall
credit rating criteria.
Little mitigating controls
required for local authority
deposits, as this is a quasi UK
Government investment.
Non- local authority deposits
will follow the approved credit
rating criteria.
As shown in
Table J.
Money Market
Funds (MMFs)
(Very low risk)
Pooled cash investment
vehicle which provides very
low counterparty, liquidity
and market risk.  These will
primarily be used as
liquidity instruments.
Funds will only be used where
the MMFs has an “AAA” rated
status from either Fitch,
Moody’s or Standard and
Poor’s.
As shown in
Table J.
Call account
deposit
accounts with
financial
institutions
(banks and
building
societies) (Low
risk depending
on credit
rating)
These tend to be low risk
investments, but will exhibit
higher risks than the first
three categories above. 
Whilst there is no risk to
value with these types of
investments, liquidity is
high and investments can
be returned at short notice. 
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Page 104

Page 105

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Term deposits
with financial
institutions
(banks and
building
societies) (Low
to medium risk
depending on
period & credit
rating)
These tend to be low risk
investments, but will exhibit
higher risks than the first
three categories above. 
Whilst there is no risk to
value with these types of
investments, liquidity is low
and term deposits can only
be broken with the
agreement of the
counterparty, and penalties
may apply.  
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Government
Gilts and
Treasury Bills
(Very low risk)
These are marketable
securities issued by the UK
Government and as such
counterparty and liquidity
risk is very low, although
there is potential risk to
value arising from an
adverse movement in
interest rates (no loss if
these are held to maturity.  
Little counterparty mitigating
controls are required, as this is
a UK Government investment.  
The potential for capital loss will
be reduced by limiting the
maximum monetary and time
exposures.
As shown in
Table J.
Certificates of
deposits with
financial
institutions (Low
risk)
These are short dated
marketable securities
issued by financial
institutions and as such
counterparty risk is low, but
will exhibit higher risks than
the first three categories
above.  There is risk to
value of capital loss arising
from selling ahead of
maturity if combined with
an adverse movement in
interest rates.  Liquidity risk
will normally be low.
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Page 105

Page 106

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Structured
deposit facilities
with banks and
building
societies
(escalating / de-
escalating rates,
etc.) (Low to
medium risk
depending on
period & credit
rating)
These tend to be medium
to low risk investments, but
will exhibit higher risks than
the first three categories
above.  Whilst there is no
risk to value with these
types of investments,
liquidity is very low and
investments can only be
broken with the agreement
of the counterparty
(penalties may apply).  
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J. 
Corporate
Bonds (Medium
to high risk
depending on
period & credit
rating)
These are marketable
securities issued by
financial and corporate
institutions.  Counterparty
risk will vary and there is
risk to value of capital loss
arising from selling ahead
of maturity if combined with
an adverse movement in
interest rates.  Liquidity risk
will be low
The counterparty selection
criteria approved above
restricts lending only to high
quality counterparties,
measured primarily by credit
ratings from Fitch, Moody’s and
Standard and Poors.  
Corporate bonds will be
restricted to those meeting the
base criteria.  
On day to day investment
dealing with this criteria will be
further strengthened by the use
of additional market
intelligence.
As shown in
Table J.
Other Types of Investments
Investment
properties
These are properties that
are not used to facilitate
service delivery but are
held solely to earn rentals
or for capital appreciation
or both.  These are highly
illiquid assets with high risk
to value (the potential for
property prices to fall or for
rental voids).  
In larger investment portfolios
some small allocation of
property based investment may
counterbalance/compliment the
wider cash portfolio.
Property holding will be re-
valued regularly and reported
annually with gross and net
rental streams. 
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m. 
Page 106

Page 107

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Loans to third
parties, including
soft loans
These are service
investments either at
market rates of interest or
below market rates (soft
loans).  These types of
investments may exhibit
credit risk and are likely to
be highly illiquid.
Each third party loan requires
Member approval and each
application is supported by the
service rational behind the loan
and the likelihood of partial or
full default.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Loans to a local
authority
company
These are service
investments either at
market rates of interest or
below market rates (soft
loans).  These types of
investments may exhibit
credit risk and are likely to
be highly illiquid.
Each loan to a local authority
company requires Member
approval and each application
is supported by the service
rational behind the loan and the
likelihood of partial or full
default.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Shareholdings in
a local authority
company
These are service
investments which may
exhibit market risk and are
likely to be highly illiquid.
Each equity investment in a
local authority company
requires Member approval and
each application will be
supported by the service
rational behind the investment
and the likelihood of loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Non-local
authority
shareholdings
These are non-service
investments which may
exhibit market risk, be only
considered for longer term
investments, likely to be
liquid.
Any non-service equity
investment will require separate
Member approval and each
application will be supported by
rational behind the service the
investment and the likelihood of
loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Page 107

Page 108

Type of
Investment
Treasury Risks Mitigating Controls Council and
Common
Good Limits
Joint venture
delivery
companies such
as hub West
Scotland
Public sector organisations
across a hub territory will
work in partnership with
each other, and a private
sector delivery partner, in a
joint venture delivery
company called hub West
Scotland.
.
Any investment in hub West
Scotland requires approval
from the Section 95 Officer
(Chief Officer - Resources) and
the Chief Executive in
consultation with the Leader of
the Council and the Leader of
the Opposition and each
application will be supported by
the service rational behind the
investment and the likelihood of
loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Regeneration
partnerships and
development
opportunities 
Investments undertaken
with the prime intention of
local area regeneration.
Any investment in a
regeneration partnership /
development opportunity
requires Member approval with
each application supported by
rational behind the investment
and the likelihood of loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Investment in
Projects
procured and
managed by
third parties e.g.
District Heating
Schemes
Investments undertaken to
assist in facilitating third
party projects where the
Council has an interest in
the successful outcome of
the project. Expectation of
a financial return for the
Council.
Any investment in such projects
requires Member approval and
each application will be
supported by a business case
for the investment and the
expectation of a financial
benefit to the Council.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Local Authority
Mortgage
Scheme (LAMS)
These are service
investments at market rates
of interest.  Under this
scheme the Council is
required to place funds for
a number of  years with the
bank which is participating
in this scheme
Any investment in the LAMS
requires Member approval and
each application will be
supported by the service
rational behind the investment
and the likelihood of loss.
The Section 95
Officer will
determine
monetary and
time limits
managing risk
accordingly, to
the maximum
total as noted
in Table L of
£7m.
Page 108

Page 109

Appendix 4 
Type of Rating Rating Explanation
Fitch 
-Short Term
F1+ Indicates exceptionally strong capacity for timely payment of
financial commitments
F1 Indicates strong capacity for timely payment of financial
commitments
Fitch
- Long Term
AA- Indicates very strong capacity for timely payment of financial
commitments and this capacity is not significantly vulnerable 
to foreseeable events
A- Indicates strong capacity for timely payment of financial
commitments.  This capacity may, nevertheless, be more 
vulnerable to changes in circumstances or in economic 
conditions than is the case for higher ratings
Moody’s
- Short Term
P-1 Banks based Prime-1 for deposits offer superior credit quality 
and a very strong capacity for timely payment of short term 
deposit obligations
Moody’s
- Long Term
Aa Offer excellent credit quality, with susceptibility to long term 
risks with a vulnerability to greater fluctuations within 
protective elements
A Offer excellent credit quality, but elements suggest a 
Susceptibility to impairment over the long term
Standard & Poors
- Short Term
A-1 Indicates a strong capacity to meet institutions financial
commitments.  Within this category, certain obligors are designated
with a plus sign (+).  This indicates that the obligor’s capacity 
to meet its financial commitments is EXTREMELY STRONG
Standard & Poors
- Long Term
AA- Indicates strong capacity for timely payment of financial
commitments
A- Indicates strong capacity for timely payment of financial
commitments.  This capacity may, nevertheless, be more 
susceptible to the adverse effects of changes in circumstances
or in economic conditions than is the case for higher rated 
category 
Page 109

Page 110

Appendix 5
West Dunbartonshire Council and Common Good Funds Permitted Investments,
Approved Countries for Investments
Based on lowest available rating
AAA  
• Australia
• Denmark
• Germany
• Netherlands
• Norway
• Singapore
• Sweden
• Switzerland
AA+
• Canada
• Finland
• U.S.A.
AA
• Abu Dhabi (UAE)
AA-
• Belgium
• France
• Qatar
• U.K.
Please note that this is the list will be updated as required on an ongoing basis
Page 110

Page 111

West Dunbartonshire Council Prudential and Treasury Indicators
General Services 32,799 76,757         59,808        27,507        14,416        11,089        11,041        10,781        10,838        10,738
Capital receipts (0) 0 0 0 0 0 0 0 0 0
Capital grants 19,492 28,081 20,038 8,477 6,722 6,722 6,722 6,722 6,722 6,722
Revenue 250 250 0 0 0 0 0 0 0 0
Other funding 0 0 0 0 0 0 0 0 0 0
Net financing need for the year 13,057 48,426 39,770 19,030 7,694 4,367 4,319 4,059 4,116 4,016
HRA 55,680 73,385 77,676 55,760 47,898 33,450 21,917 22,355 21,854 21,854
Capital receipts 0 0 0 0 0 0 0 0 0 0
Capital grants 9,885 13,004 8,941 4,573 4,010 3,074 0 0 0 0
Revenue 0 0 0 0 0 0 0 0 0 0
Other funding 0 0 0 0 0 0 0 0 0 0
Net financing need for the year 45,795 60,381 68,735 51,187 43,888 30,376 21,917 22,355 21,854 21,854
General Services 32,799 76,757 59,808 27,507 14,416 11,089 11,041 10,781 10,838 10,738
HRA 55,680 73,385 77,676 55,760 47,898 33,450 21,917 22,355 21,854 21,854
Capital Expenditure 88,479 150,142 137,484 83,267 62,314 44,539 32,958 33,136 32,692 32,592
Capital receipts (0) 0 0 0 0 0 0 0 0 0
Capital grants 29,377 41,085 28,979 13,050 10,732 9,796 6,722 6,722 6,722 6,722
Revenue 250 250 0 0 0 0 0 0 0 0
Other funding 0 0 0 0 0 0 0 0 0 0
Net financing need for the year 58,852 108,807 108,505 70,217 51,582 34,743 26,236 26,414 25,970 25,870
Capital Financing Requirement
CFR – General Services         396,061         445,645   492,739   517,478   534,331   542,753   546,909   551,141   555,136   559,064 
CFR – HRA         396,061         445,645   492,739   517,478   534,331   542,753   546,909   551,141   555,136   559,064 
Total CFR         792,123         891,290   985,477   1,034,956   1,068,662   1,085,506   1,093,818   1,102,282   1,110,272   1,118,128 
Movement in CFR 49,745 99,168         94,187        49,479        33,705        16,844          8,312          8,464          7,990          7,857
Movement in CFR represented by
Net financing need for the year (above) 58,852         108,807   108,505        70,217        51,582        34,743        26,236        26,414        25,970        25,870 
Loans Fund Review -                     - -                   - -                   - -                   - -                   - 
Less scheduled debt amortisation and other financing
movements (9,107) (9,639)      (14,318)      (20,738)      (17,877)      (17,899)      (17,923)      (17,950)      (17,980)      (18,013)
Movement in CFR 49,745 99,168         94,187        49,479        33,705        16,844          8,312          8,464          7,990          7,857
Forecast
2032/33
Forecast
2032/33
Forecast
2032/33
Forecast
2032/33
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Financed by:
Table B - Capital Financing Requirement 
£000 Forecast
2023/24
General Services and HRA Combined
£000 Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2031/32
Financed by:
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Table A - Net Capital Financing Need
General Services and HRA Shown Separately
£000 Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2031/32£000
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Financed by:
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2023/24
APPENDIX 6
Page 111

Page 112

West Dunbartonshire Council Prudential and Treasury Indicators
Table C - Internal Loan Fund Repayment Profile (excluding PPP repayments)
£M £M £M
Under 12 months 4.023 6.836 10.859
2 years to 5 years 16.888 27.080 43.968
6 years to 10 years 23.520 38.567 62.087
11 years to 15 years 27.967 30.964 58.931
16 years to 20 years 25.956 38.527 64.483
21 years to 25 years 18.217 42.462 60.679
26 years to 30 years 12.574 25.349 37.923
31 years to 35 years 9.941 5.304 15.245
36 years to 40 years 11.526 3.250 14.776
41 years to 45 years 12.257 3.378 15.635
46 years to 50 years 14.057 4.785 18.842
51 years to 55 years 18.900 7.114 26.014
56 years to 60 years 24.414 8.395 32.809
60  years plus 134.080 22.244 156.324
Total 354.320 264.255 618.575
General Services (Exc PPP) 10.64% 12.21% 11.83% 11.07% 8.10% 2.80% 2.63% 2.99% 3.08% 3.21%
General Services 15.19% 16.69% 16.22% 15.32% 12.20% 6.74% 6.46% 6.67% 6.58% 6.50%
HRA 38.22% 42.68% 41.12% 38.57% 46.79% 14.68% 14.47% 14.00% 12.70% 11.25%
External Debt
Debt at 1 April 620,831 670,883 768,637 863,570 913,764 948,204 965,806 974,899 984,171 992,999
New Borrowing - CFR 50,052 97,754 94,933 50,195 34,440 17,601 9,094 9,272 8,828 8,728
Debt at 31 March 670,883 768,637 863,570 913,764 948,204 965,806 974,899 984,171 992,999 1,001,727
Long Term Liabilities at 1 April 90,122 89,815 91,229 90,482 89,767 89,032 88,275 87,494 86,686 85,847
Change in Long Term Liabilities (307) 1,414 (746) (716) (735) (757) (782) (808) (838) (871)
Long Term Liabilities at 31 March 89,815 91,229 90,482 89,767 89,032 88,275 87,494 86,686 85,847 84,976
Gross Debt at 31 March         760,698         859,865   954,052   1,003,531   1,037,237   1,054,081   1,062,393   1,070,857   1,078,847   1,086,703 
Capital Financing Requirement         792,123         891,290   985,477   1,034,956   1,068,662   1,085,506   1,093,818   1,102,282   1,110,272   1,118,128 
Under / (Over) Borrowing 31,425 31,425         31,425        31,425        31,425        31,425        31,425        31,425        31,425        31,425
Forecast
2032/33
Forecast
2032/33
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Table E - Gross External Debt compared to the Underlying Need to Borrow (CFR)
£000 Forecast
2023/24
Forecast
2024/25
Forecast
2031/32
Forecast
2025/26
Forecast
2026/27
Forecast
2031/32
HRA Total
Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Table D - Ratio of Financing Costs to Net Revenue Stream
General
Services
Page 112

Page 113

West Dunbartonshire Council Prudential and Treasury Indicators
External Debt        737,971         845,500   949,927   1,005,141   1,043,025   1,062,386   1,072,389   1,082,589   1,092,299   1,101,900
Long Term Liability 98,797         100,352         99,531        98,744        97,936        97,103        96,243        95,354        94,432        93,474
Total        836,768         945,852   1,049,457   1,103,884   1,140,960   1,159,489   1,168,632   1,177,943   1,186,731   1,195,374
External Debt        805,059         922,364   1,036,284   1,096,517   1,137,845   1,158,967   1,169,879   1,181,006   1,191,599   1,202,073
Long Term Liability        107,778         109,475   108,579   107,720   106,839   105,930   104,993   104,023   103,017   101,971
Total        912,837   1,031,839   1,144,863   1,204,237   1,244,684   1,264,897   1,274,872   1,285,028   1,294,616   1,304,044
Bank Rate 5.25% 5.25% 4.75% 4.25% 3.75% 3.25% 3.00% 3.00% 3.00% 3.00% 3.00%
5yr PWLB Rate 4.50% 4.40% 4.30% 4.20% 4.10% 4.00% 3.80% 3.70% 3.60% 3.60% 3.50%
10yr PWLB Rate 4.70% 4.50% 4.40% 4.30% 4.20% 4.10% 4.00% 3.90% 3.80% 3.70% 3.70%
25yr PWLB Rate 5.20% 5.10% 4.90% 4.80% 6.40% 4.40% 4.30% 4.20% 4.20% 4.10% 4.10%
50yr PWLB Rate 5.00% 4.90% 4.70% 4.60% 4.40% 4.20% 4.10% 4.00% 4.00% 3.90% 3.90%
Long term rating 1 year 2 years 3 years 4 years 5 years
AAA 0.04% 0.09% 0.16% 0.25% 0.34%
AA 0.02% 0.04% 0.09% 0.16% 0.22%
A 0.05% 0.13% 0.24% 0.36% 0.50%
BBB 0.14% 0.38% 0.65% 0.97% 1.29%
BB 0.64% 1.85% 3.21% 4.50% 5.73%
B 2.73% 6.63% 10.29% 13.41% 15.82%
CCC 18.60% 26.52% 31.84% 34.95% 37.84%
Note - The AAA default risk is actually higher than the AA default risk due the number of AAA rated institutions left
Forecast
2031/32
Forecast
2025/26
Forecast
2026/27
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Mar-26
Table H - Interest Rate Forecast
Table G - Authorised Limit
£000 Forecast
2023/24
Forecast
2024/25
Sep-26Jun-26
Table I - Historic Risk of Default
Sep-24 Dec-24 Mar-25 Jun-25 Sep-25 Dec-25Link Asset Services Interest Rate View Mar-24 Jun-24
Forecast
2032/33
Forecast
2032/33
Forecast
2027/28
Forecast
2028/29
Forecast
2029/30
Forecast
2030/31
Forecast
2031/32
Table F - Operational Boundary
£000 Forecast
2023/24
Forecast
2024/25
Forecast
2025/26
Forecast
2026/27
Page 113

Page 114

West Dunbartonshire Council Prudential and Treasury Indicators
Investment Fitch
Category (or
equivalent) Money Limit
F1+ / AA- £10million
F1 / A- £5 million
2 F1/A- £10 million
(per group)
3 £5 million
4 £5 million
5 As in 1 above £10million
and £5million
Sector Limit £25 million
Fund Limit £5 million
7 No limit
Sector Limit £25 million 
Fund Limit £5 million
£000 1% -1%
Variable Rate Debt Payments N/A N/A N/A
Variable Rate Investment income 53,000 530 -530
364 days
Very liquid no time limit
applies
6 months
364 days
Table K - Sensitivity to Interest Rate Movements
1
6
8
Table J -  Counterparty Limits
Time Limit
364 days
364 days
Overnight
364 days
Page 114

Page 115

West Dunbartonshire Council Prudential and Treasury Indicators
2023/24
Upper
Limits on fixed interest
rates
Limits on variable
interest rates
Lower  Upper Lower Upper Lower Upper
Under 12 months 0% 50% 0% 50% 0% 50%
12 months to 2 years 0% 50% 0% 50% 0% 50%
2 years to 5 years 0% 50% 0% 50% 0% 50%
5 years to 10 years 0% 50% 0% 50% 0% 50%
10 years to 20 years 0% 50% 0% 50% 0% 50%
20 years to 30 years 0% 50% 0% 50% 0% 50%
30 years to 40 years 0% 50% 0% 50% 0% 50%
40 years to 50 years 0% 100% 0% 100% 0% 100%
50 years to 60 years 0% 100% 0% 100% 0% 100%
60 years to 70 years 0% 100% 0% 100% 0% 100%
Principal sums invested
> 364 & 365 days
Maturity Structure of fixed interest rate borrowing
£7m£nil
Table L- Treasury Management Limits on Activity
£nil £7m £nil £7m
100% 100% 100%
50% 50% 50%
2024/25 2025/26
Upper Upper
Page 115

Page 116

Page 116

Page 117

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 27 March 2024
___________________________________________________________________
Subject: General Services Budgetary Control Report to 31 January 2024
(Period 10)
1. Purpose
1.1 This report provides an update on the General Services revenue budget and
the approved capital programme to 31 January 2024.
2. Recommendations
2.1 Council is asked to:
i) note a current projected annual adverse variance on the revenue
account of £0.433m (0.2% of total budget); and
ii) note that projected expenditure on the capital account is lower than the
2023/24 budget by £59.397m (64.42% of budget), made up of
£59.786m (64.84% of budget) of project re-profiling, and an in-year
overspend of £0.388m (0.42% of budget).
3. Background
Revenue
3.1 At the meeting of West Dunbartonshire Council (the Council) on 1 March
2023, Members agreed the revenue estimates for 2023/2024. A total net
budget of £265.160m was approved for General Services.
3.2 Since the budget was agreed, additional funding has been provided by the
Scottish Government of £7.675m; revising the total net budget to £271.229m
as shown in the table below:
Service £m £m
Agreed 2023/24 Revenue Budget 1 March 2023 265.160
Additional Funding:
No One Left Behind Housing & Employability 0.189
Child Poverty Housing & Employability 0.078
Teacher’s Pay Award Education 2.724
Summer 23 Programme Education 0.080
Local Govt Pay Award (Para 4.8) All 4.589
Training for Support Staff Education 0.015
Total Additional Funding 7.675
Additional Revenue Support Grant (Para 4.9) (1.606)
Revised 2023/24 Revenue Budget as at Period 10 271.229
ITEM 11
Page 117

Page 118

Capital
3.3 At its 1 March 2023 meeting, the Council also agreed the updated General
Services Capital Plan for 2023/2024 to 2031/32.  The three years from
2023/24 to 2025/26 were approved in detail with the remaining years being
indicative at that stage. After adjusting for anticipated re-profiling from 2022/23
into 2023/24, the budget agreed for 2023/24 was £79.916m, as noted below.   
3.4 Since then, budget adjustments have taken place through
• further 2022/23 capital re-profiling
• additional external funding
• additional income received in 2022/23 which should have been carried
forward into 2023/24 per grant conditions
This results in a revised 2023/24 capital budget of £92.199m, as follows:
£m
Agreed 2023/24 Capital Budget (Council – March 2023) 79.916
Additional re-profiling from 2022/23 – following year end 9.206
Additional income received in 2022/23 0.125
New Funding 
Nature Restoration Fund 0.257
Cycling, Walking and Safer Streets 0.561
Strathclyde Partnership for Transport 0.650
Road Safety  0.134
School Upgrades 0.200
Play Parks 0.157
Community Bus 0.008
Building Upgrades – New Weather Pitches & Outdoor Classroom 0.360
East End Resurfacing 0.175
Dalmonach Steps Upgrade 0.200
Pappert 2G Pitch 0.250
Revised 2023/24 Capital Budget as at Period 10 92.199
4. Main Issues
Revenue
4.1 The summary report at Appendix 1 highlights a projected annual adverse
variance (overspend) of £0.433m (0.2% of the total budget). This is an
improved position of £2.352m from the £2.785m adverse position reported at
period 7.  This is primarily due to:
• additional revenue support grant of £1.606m as detailed in the table above
and at paragraph 4.9;
• an in-depth review of the Roads and Neighbourhood services budget
which identified opportunities to improve the projected year end outturn by
£0.700m as reported to the IRED Committee on 7 February 2024.
Page 118

Page 119

Appendix 2 provides more detailed service reports by Chief Officer.
4.2 Information on projected annual variances in excess of £0.050m are
highlighted and noted within Appendix 3, with additional information on action
being taken to minimise or mitigate overspends where possible.
4.3 A list of agreed management adjustments totalling £11.809m is shown within
Appendix 4.  Current indications show, £11.157m is on target to be achieved. 
However, Appendix 4 also shows that it is anticipated that £0.651m will not be
achieved and will be funded by the smoothing fund for 2023/24 only, with the
expectation that the full saving will be achieved in future years.
4.4 A breakdown of the 2023/24 earmarked balances are shown within Appendix
5 and is summarised as follows:
£m
Earmarked balances brought forward from 2022/23 24.590
Adjustment to revenue reserve in relation to cost of living
initiatives, transferred from capital reserve
0.225
Revised Earmarked balances brought forward from
2022/23 
24.815
Anticipated forecast spend 2023/24 (11.963)
Amounts due to be released in 2023/24 (1.820)
Balance anticipated to be c/fwd into 2024/25 11.032
4.5 Due to the current financial challenges facing the Council, recruitment
restrictions have been implemented and the filling of vacancies is subject to
active review. For variances linked to this action (beyond the budgeted
turnover targets), in year savings through not filling vacancies, are now being
removed from services and held in a central code. This has resulted in a
number of favourable service variances being removed from services and
held centrally (currently £0.990m).  This has no impact on the overall
projected outturn of the Council, simply on how that outturn is reported. 
4.6 With vacancy savings being removed from service budgets and transferred to
a central budget, other projected overspends identified within services are
now more clearly reported. This demonstrates that, if the Council were to only
meet the budgeted turnover level of vacancies, there would be a far more
significant overspend which highlights the extent to which the Council cannot
afford to operate with its current full establishment.
4.7 The effects of removing the vacancy savings from service budgets to a central
budget as at Period 10 are noted below:
Service with Vacancy
Transfers at Period 10
Variance in
BCR
(under)/over
£000
Vacancy
Savings Moved
to Central
Budget
(under)/over
£000
Variance if
vacancies were
not removed
(under)/over
£000
Resources 478 63 415
Page 119

Page 120

Regulatory and
Regeneration
(612) 244 (856)
People and Technology (283) 115 (398)
Citizens, Culture & Facilities (67) 406 (473)
Roads and Neighbourhood 1,074 79 995
Miscellaneous 329 83 246
Central Budget 990
4.8 The 2023/24 budget has been increased to reflect the £4.589m of funding
made available by the Scottish Government for the 2023/24 pay award which
was based on the total local government workforce. Council have the
autonomy to allocate funding based on local needs and priorities.  Therefore,
as reported to Council as part of the financial update paper on 20 December
2023, the budgetary control report assumes 100% of the funding will be
retained by the Council pending a Council decision to be taken on 6 March
2024, when the Council agrees the 2024/25 budget.
4.9 The staff of the Health and Social Care Partnership (HSCP) make up 35% of
the overall Council staff costs (excluding Teachers) which represents £1.606m
as a proportion of the £4.589m of funding. If, on 6 March 2024, Council decide
to pass through all or some of this additional Revenue Support Grant funding
to the HSCP, the amount passed through will increase the need to use
Council reserves to offset any in-year variance.   
Capital
4.10 The current progress on the capital plan is shown in Appendices 6 to 9.
4.11 The overall programme summary report at Appendix 6 shows that planned
2023/24 expenditure is lower than the 2023/24 budget by £59.397m (64.42%
of budget), made up of £59.786m (64.84% of budget) of project re-profiling,
and an in-year overspend of £0.388m (0.42% of budget).
4.12 Appendix 6 also provides an analysis of the overall programme at each alert
status and a summary budgetary control report including detailing the number
of projects and corresponding spend as a percentage of the overall
programme currently at red, amber or green alert status for project life and the
current year.  The current projections are based on best judgement as to how
these projects will continue in operation during the remainder of the year.
4.13 Appendices 7 and 8 detail the financial analysis of projects at red and green
status respectively (currently no amber) and provide additional information on
action being taken to minimise or mitigate under or overspends where
possible. Appendix 9 provides an analysis of resources.
4.14 From the analysis within the appendices it can be seen there are a number of
projects with identified re-profiling to date. Those with re-profiling valued at
greater than £0.500m, are listed as follows:
Page 120

Page 121

Project Name
Period 7
Re-profiling
(£m)
Period 10
Re-profiling
(£m)
Movement
(£m)
Strathleven Place 1.540 1.540 0
New West Bridgend
Community Centre 0.990 1.053 0.063
Regeneration/Local Economic
Development 1.911 2.422 0.511
Regeneration Fund 3.824 3.824 0
Clydebank Can on the Canal 0.707 0.707 0
LUF 0 14.871 14.871
District Heating Network
Expansion 6.959 7.109 0.150
Heritage Fund 0.558 0 0
River Leven Flood Prevention
Scheme  0.620 0.620 0
Gruggies Burn 0.930 0.930 0
Vehicle Replacement Strategy 0.500 0.900 0.400
Vehicle Replacement 0 2.859 2.859
Waste Transfer Station 1.780 1.780 0
Exxon City Deal 7.845 7.845 0
Depot Rationalisation 1.938 2.138 0.200
Schools Estate Improvement
Plan 0.985 3.700 2.715
Schools Estate Improvement
Plan - next Phase - Faifley
Campus 0 1.916 1.916
HSCP ICT Upgrade of systems 0.534 0.534 0
4.15 For comparison purposes, a summary of the change in re-profiling since the
last budgetary control report presented to Council is noted below:
Period 7 Period 10 Movement
£m £m £m
Overall capital plan 91.266 92.199 0.933
Overall variance (36.365) (59.397) (23.033)
Re-Profiling (35.988) (59.786) (23.798)
Net over/ under (0.377) 0.388 0.765
% Re-Profiling 39.43% 64.84% 25.41%
Page 121

Page 122

5. Option Appraisal
5.1 No option appraisal was required for this report.
6. People Implications
6.1 There are no people implications.
7. Financial and Procurement Implications
7.1 The report notes the projected in-year financial position for both General
Services revenue and capital budgets.
8. Risk Analysis
8.1 The main risks are as follows:
(a) The present variances should be viewed in the knowledge that there are
a number of variable factors which could arise between now and 31
March which could affect the year end results for both the revenue and
capital budgets;
(b) As a consequence of current market conditions, capital receipts may
either not be received or they may be less than anticipated. The budget
assumption is that all capital receipts achieved in 2023/24 will be used to
the principal and premium repayments within the loan charges budget.
Any shortfall in capital receipts below that budgeted will affect the
revenue budget position. This is being closely monitored and any issues
will be reported to Council;
(c) As a consequence of current market conditions, inflation is at an all-time
high and interest rates continue to rise. To forecast for the full year costs
budget assumptions have been required (particularly around energy and
interest costs). These assumptions continue to change regularly and
therefore it is likely that the projected year end budgetary position will
change from that reported.
9. Equalities Impact Assessment (EIA)
9.1 No equalities impact assessment was required in relation to this report.
10. Environmental Sustainability
10.1 No assessment of environmental sustainability was required in relation to this
report.
11. Consultation
11.1 All services involved in delivering the revenue and capital budgets have been
consulted in the compilation of this report. 
Page 122

Page 123

12. Strategic Assessment
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council. 
_________________
Laurence Slavin
Chief Officer – Resources
Date: 7 March 2024
__________________________________________________________________
Person to Contact: Janine Corr, Accountant
Council Offices, Church Street, Dumbarton
E-mail: janine.corr@west-dunbarton.gov.uk
Appendices: Appendix 1 - Revenue Budgetary Control 2023/24
– Corporate Summary;
Appendix 2 - Revenue Budgetary Control 2023/24
– Chief Officer Summaries;
Appendix 3 - Analysis of Revenue Variances over
£50,000;
Appendix 4 - Monitoring of Efficiencies
Appendix 5 - Monitoring of Earmarked Balances
Appendix 6 - Overall Capital Programme Summary;
Appendix 7-  Analysis of Projects at Red Status;
Appendix 8 - Analysis of Projects at Green Status;
Appendix 9 -  Analysis of Capital Resources.
Background Papers:
• Ledger output – Period 10;
• General Services Revenue Estimates 2023/24
• General Services Capital Plan Update - Council 1 March
2023.
Wards Affected   All Wards
Page 123

Page 124

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2023/24
SUMMARY
PERIOD END DATE 31 January 2024
Total Budget Spend to Date Projected Spend Annual RAG
Status
£000 £000 £000 £000 %
Resources 1,801 9,677 2,279 478 26.5% 
Regulatory and Regeneration 3,243 3,582 2,631 (612) -18.9% 
People & Technology 10,485 9,181 10,202 (283) -2.7% 
Citizens, Culture and Facilities 14,819 13,535 14,751 (67) -0.5% 
Education, Learning and Attainment 120,349 100,839 123,588 3,240 2.7% 
Roads and Neighbourhood 16,656 24,990 17,730 1,074 6.4% 
2,873 4,557 2,964 91 3.2% 
Miscellaneous Services 7,562 6,997 7,875 313 4.1% 
Vacancy Freeze 990 0 0 (990) -100.0% 
Loan Charges 13,976 11,647 13,976 0 0.0% 
Capital Receipts used to fund Loan Charges (2,884) (2,403) (2,884) 0 0.0% 
Requisition (VJB) 732 584 779 47 6.4% 
Requisition (SPT) 1,588 1,588 1,588 0 0.0% 
Requisition (CJP) 1,697 0 63 (1,634) -96.3% 
Requisition (HSCP) 84,671 70,559 84,671 0 0.0% 
Non GAE Allocation (7,328) (6,107) (7,328) 0 0.0% 
Total Expenditure 271,229 249,225 272,886 1,657 0.6% 
Council Tax (40,254) (33,545) (40,254) 0 0.0% 
Revenue Support Grant (131,105) (104,056) (131,086) 19 0.0% 
Non Domestic Rates (93,396) (77,830) (93,396) 0 0.0% 
Use of Reserves (6,474) (6,733) (7,717) (1,243) 19.2% 
Total Resources (271,229) (222,164) (272,453) (1,224) 0.5% 
Net Expenditure (0) 27,061 433 433 0.2% 
Department Summary Variance
Housing and Employability
Page 124

Page 125

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
RESOURCES SUMMARY
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
90 45 77 (13) -14% 
1,329 1,262 1,404 75 6% 
(341) 3,710 (226) 115 -34% 
2,300 2,185 2,282 (18) -1% 
333 275 341 8 2% 
17 0 37 20 115% 
(798) (246) (823) (25) 3% 
Office Accommodation 1,231 1,213 1,293 62 5% 
Corporate Assets (2,361) 1,284 (2,092) 269 -11% 
0 (50) (14) (14) 0% 
1,801 9,677 2,279 478 27% Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Corporate Asset Maintenance
Variance
Service Summary
Service / Subjective Summary
Finance Business Centre
Audit
Revenues & Benefits
Page 125

Page 126

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status 
£000 £000 £000 £000 %
802 671 775 (27) (0) 
767 701 769 2 0 
(143) (199) (220) (77) 1 
759 758 747 (12) (0) 
715 143 231 (484) (1) 
169 542 134 (35) (0) 
Economic Development 174 966 195 21 0 
3,243         3,582 2,631 (612) (0) 
Democratic and Registration Service
Legal Services
Licensing
Environmental Health
Planning
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Procurement
Page 126

Page 127

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
836 757 833 (3) 0% 
2,074 1,711 2,041 (33) -2% 
4,682 4,263 4,452 (230) -5% 
Central Administration Support 2,894 2,450 2,876 (18) -1% 
10,485 9,181 10,202 (283) -3% 
Variance
Total Net Expenditure
Transactional Services
Information Services
Strategic People and Change
Service / Subjective Summary
Service Summary
Page 127

Page 128

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
267 178 221 (47) -17% 
1,367 1,312 1,371 4 0% 
244 181 226 (18) -7% 
Clydebank Town Hall 345 184 284 (61) -18% 
Libraries 1,865 1,495 1,863 (2) 0% 
Arts and Heritage 311 259 307 (4) -1% 
Catering Services 4,786 4,821 4,813 27 1% 
Building Cleaning 1,854 1,722 1,809 (45) -2% 
Building Cleaning PPP (187) (121) (156) 31 -16% 
Facilities Assistants 2,394 2,015 2,411 17 1% 
Facilities Management 578 500 595 18 3% 
Communities 947 932 953 6 1% 
Events 48 55 55 7 15% 
14,819 13,535 14,751 (67) 0% 
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy
Page 128

Page 129

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
Primary Schools 33,553 27,257 33,235 (319) -1% 
Secondary Schools 33,392 27,704 33,387 (5) 0% 
Specialist Educational Provision 17,600 15,177 20,982 3,383 19% 
Psychological Services 621 464 585 (36) -6% 
Sport Development / Active Schools 627 (209) 627 0 0% 
Early Education 9,759 5,556 9,748 (11) 0% 
PPP 16,501 16,608 16,545 44 0% 
Creative Arts 658 501 655 (3) 0% 
Curriculum for Excellence 92 72 92 0 0% 
Central Admin 955 876 953 (2) 0% 
Workforce CPD 368 268 368 (0) 0% 
Performance & Improvement 457 429 479 22 5% 
Education Development 2,065 1,629 2,052 (13) -1% 
Raising Attainment - Primary 0 0 0 0 0% 
Leisure Management 3,701 4,507 3,880 180 5% 
Raising Attainment - Secondary 0 0 0 0 0% 
Pupil Equity Fund (including LAC PEF) 0 0 0 0 0% 
120,349 100,839 123,588 3,240 3% 
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure
Page 129

Page 130

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
Transport, Fleet & Maintenance Services (540) 437 (260) 280 -52% 
Roads Services 3,107 3,423 3,377 270 9% 
Grounds Maintenance & Street Cleaning Client 7,416 6,180 7,196 (220) -3% 
Outdoor Services 197 214 284 87 44% 
Burial Grounds (265) (481) (216) 49 -18% 
Crematorium (1,096) (677) (964) 132 -12% 
Waste Services 9,868 8,562 10,278 410 4% 
Depots (1) 0 0 1 -116% 
Capital Investment Programme (5) 300 2 7 -140% 
Consultancy Services 225 548 265 40 18% 
Ground Maintenance & Street Cleaning Trading A/c (2,250) 6,483 (2,233) 17 -1% 
16,656 24,990 17,730 1,072 6% 
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure
Page 130

Page 131

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
Working 4 U 2,328 2,676 2,231 (97) -4% 
Homeless Persons 552 1,805 904 352 64% 
Private Sector housing 18 15 18 0 0% 
Private Sector Housing Grants 83 0 84 1 1% 
Housing Maintenance Trading A/c (550) (125) (567) (17) 3% 
Housing Asset and Investment 50 0 0 (50) -100% 
Anti Social Behaviour 392 185 294 (98) -25% 
2,873 4,557 2,964 91 3% 
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 131

Page 132

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
MISCELLANEOUS
PERIOD END DATE 31 January 2024
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
5,599 5,379 5,962 363 6% 
701 565 673 (28) -4% 
1,262 1,053 1,240 (22) -2% 
7,562 6,997 7,875 313 4% 
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
Service Summary
Sundry Services
Members Allowances, etc
Page 132

Page 133

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
Finance 1,329 1,404 75 6% 
.
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Rent Rebates & Allowances (341) (226) 115 -34% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Office Accommodation 1,231 1,293 62 5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Corporate Assets (2,361) (2,092) 269 -11% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
None available. Officers will continue to monitor and review budgets
This service provides asset and estate management
Savings options have not been realised in respect of re letting of proposed sites,
which has therefore left the Council liable.
The unachieved amount of saving (£0.427m) will be funded from the smoothing
fund for 2023/24.  It is anticipated that the full saving will be achieved in future
years.
After use of the smoothing fund, a favourable variance is anticipated.
This service provides the office buildings for the Council.
The overspend is mainly due to higher rates and energy costs than anticipated
when the budget was set.
Overspend anticipated
Payment of Rent Rebates and other Allowances
31 January 2024
Budget Details
Adverse variance is anticipated
The service provided by this area deals with Accountancy, Capital, Treasury,
Reconciliations, Cash Office and Municipal Bank
Variance Analysis
Variance
Reduction in overpayment (OP) recoveries is due to DWP recovering some HB
OP’s against Universal Credit, subject to the OP reason. Previously the Council
would have received 40% subsidy in OP’s with the ability to recover 100% of the
OP, therefore a potential to receive up to 140% of the OP value.  This change
means we receive 100% subsidy of the OP therefore a reduction from the
potential 140% that could have been recovered.
Main reason for adverse variance is full turnover savings are not being achieved.
Resources
None available at this time.
Adverse variance is anticipated
None available at this time.
Page 133

Page 134

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Licensing (143) (220) (77) 54% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Planning 715 231 (484) -68% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Information Services 4,682 4,452 (230) -5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
There are two main favourable varainces  income is higher than budgeted. The
additional income predicted is an in-year benefit only as a result of one-off
additional fees. Staffing is favourable due to vacancies
People & Technology
This Service provides Building & Planning services
None required
This service area provides general ICT support to the Council and also supports
transformational change and modernisation of working practices through
technology
Favourable variance overall is anticipated
There are three main reasons for the favourable variance. Staffing is favourable
due to vacancies. Additional telephone costs are being offset by recharge
income to recover these from other services. In addition centralised printing and
leasing costs for copiers are anticipated to overspend during the year.
Regulatory and Regeneration
This service provides all licensing on behalf of the Council
None required
A favourable variance is anticipated.
No action is possible at this time.
The main reason for the variance is an increase in expected income.
Favourable variance is anticipated
Page 134

Page 135

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Primary Schools 33,553 33,235 (319) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome An underspend is anticipated.
Expenditure (particularly utility prices) and income (particularly income from
school meals in the new academic year) will be closely monitored.
Education , Learning and Attainment
This service area includes all Primary Schools.
The principal adverse variances are an increase in the caseload for clothing
grants (£66k) and an overspend against employee costs (£245k) , mainly APT&C
following the increase in turnover targets . Other property costs are greater than
expected (£36k) principally due to fencing requirements at Our Lady of Loretto.
SPT bus contract costs are also anticipated to be higher (£36k) than when the
budget was set. Offsetting this is a favourable variance against school meals
income following an alteration in the timetable for the expansion of free school
meals to primaries 6 and 7 (£220k) albeit income from lets is adverse (£19k).
Utility prices have been particularly volatile over the past 18 months. Electricity
and gas budgets were increased by about 11% for 2023/24 . However, actual
prices for electricity have increased by up to 70% while gas prices have fallen by
22%. The overall impact has been favourable with an aggregate favourable
variance of £497k.
Page 135

Page 136

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Specialist Educational Provision 17,600 20,982 3,383 19% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area covers all ASN Services.
Expenditure and income  will be closely monitored.
An overspend is anticipated.
The principal adverse variances are an overspend on APT&C employee costs
(£291k) following the increase in turnover targets and the knock-on effects of last
year's higher pay increase . Transport costs will be significantly over-budget due
to difficulties sourcing sufficient taxis with a subsequent need to replace them
with buses (£299k). The number of pupils on day placements is now 2 per month
greater than last year's and the average increase in daily rates from providers is
28% .Day placement costs are therefore significantly higher (£780k) while
residential placements (£2.051m) are 33% greater at a time when residential
placement costs have also increased considerably. There is an  adverse
variance against the budget for placements with other local authorities (£67k)
and projected income from other local authority placements within West
Dunbartonshire is also adverse (£96k). Property costs (£13k)  are favourable
because of backdated rates relief offsetting higher electricity costs. Income to
assist with Ukrainian pupils (£176k) has been received and will offset additional
employee costs.
Page 136

Page 137

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Leisure Management 3,701 3,880 180 5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Roads Services 3,107 3,377 271 9% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Transport, Fleet & Maintenance
Services (540) (260) 279 -52% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome Overspend anticipated at present.
An adverse variance is anticipated.
Transport services across WDC
Roads and Neighbourhood
Management will continue to monitor all budget heads with a view to minimising
the overspend.
This service relates to Roads operations, design, structures, street lighting, road
safety and school crossing patrols
Expenditure and income  will continue to be monitored.
The cost of specialist repairs and materials/parts has increased to levels not
reflected in current budgets and overtime remains over budget. VTU income
remains adverse (£55k) due to continuing restrictions on what MOTs are
undertaken.There has been a reduction in
Adverse variance is anticipated.
The management fee to WDLT has been higher because of delays in the
reduction in community facilities provision. In addition budgeted contribution from
Education towards overall management fee overstated.The unachieved saving
will be considered for funding from the smoothing fund for 2023/24
Payment to West Dunbartonshire Leisure Trust for leisure services
None at the moment.
There is a small overspend on employee costs (£21k) with increasing pressure
on overtime budgets. Plant hire costs have increased during the year to a level
not foreseen when the budget was set (£280k) . Similarly, street lighting costs
have increased during the year to a level not anticipated when the budget was
set due to unique inflationary pressures (£276k). Miscellaneous property costs
are also (£15k) greater than anticipated (the largest being the depot cost
allocation including a higher electricity element and non-domestic rates charges).
Payments to contractors/materials (£310k) are anticipated to be higher than
anticipated when the budget was set. As a result of higher operating costs
income, including capital recharges, are anticipated to be greater than budgeted
(£632k)
Page 137

Page 138

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Outdoor Services 197 284 87 44% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Crematorium (1,096) (964) 132 -12% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Waste Services 9,868 10,278 410 4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Employee costs are higher due to higher turnover targets and higher overtime
than reflected in the budget (£258k) . Transport costs, principally hires, are
greater than anticipated when the budgets were set because of delays in
acquiring new vehicles (£336k).Supplies and Services lowere due changes to
collection methods.
Income and expenditure will continue to be monitored throughout the year.
This service provides crematorium services within the Council area
The increased income target is unlikely to be met
Income from fees and charges is unlikely to be as budgeted (£70k). Other costs -
principally electricity - are higher than when the budget was set.
Although there are savings on gas costs income from cremations is less than
budgeted .
Income will be monitored to establish whether there has been a downtown in
demand.
Income and expenditure will continue to be monitored throughout the year.
Overspend anticipated.
This service covers the outdoor sporting facilities provided by WDC and public
conveniences
Waste Collection and Refuse disposal services
Overspend anticipated
Page 138

Page 139

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Grounds Maintenance & Street
Cleaning Client 7,416 7,196 (220) -3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Working 4 U 2,328 2,231 (97) -4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Homeless Persons 552 904 352 64% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Anti Social Behaviour 392 294 (98) -25% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
A year end underspend is anticipated
The adverse variance is due to the inflationary effect on costs of white goods and
furniture together with requirement to retain bed and breakfast places due to
demand / delay in having WDC properties available,
None required
A year end underspend in Anti-Social Behaviour Service
Favourable variance due to vacant post plus reduced recharges from HRA.
This service seeks to prevent homelessness occurring across the authority and
improves access to support services
A year end overspend is anticipated
It is expected that the need for bed and breakfast contingency will cease later in
year as more WDC properties become ready for occupancy
None Required
This service provides the delivery of grounds maintenance and street cleaning
The main reason for this favourable variance relates to costs being funded by
Developer Contributions.
This is the provision of Working 4u service
None Required
A year end underspend is anticipated
This is the provision of the anti social behaviour service within the Council area
Housing and Employability
The favourable variance reflects an in-year reduction in payments to other
bodies.
Page 139

Page 140

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Housing Asset and Investment 50 0 (50) -100% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Employee costs are showing a favourable variance due to vacant posts within
the service.  Employee cost underspend is offset by a reduction in the level of
income being recharged to the Housing Revenue Account.
None Required
A year end underspend is anticipated
This service manages capital investment across council and private sector
housing stock.
Page 140

Page 141

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Sundry Services 5,599 5,962 363 6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Vacancy Freeze 990 0 (990) -100% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Income and expenditure will continue to be monitored throughout the year.
An overall adverse variance is anticipated at this time
Miscellaneous
This service area budgets for non departmental specific costs such as pensions
costs, external grants and elderly welfare payments, external audit fees and
insurance costs. The service heading also holds a number of general savings
options which have still to be fully allocated eg procurement targets.
One of the main reasons for this variance relates to anticipated increased cost of
insurance (£0.300m).  The Council's insurance policies have recently been
renewed and the revised policies have increased excesses with an increased
requirement of "self-insurance". The remaining variance is the result of the
procurement savings target not being fully achieved.
Other
This budget represents the removal of budgeted vacancies from service
departments.
A favourable variance is anticipated
The favourable variance reflects the non filling of vacancies due to the
implementation of recruitment restrictions.
None required.
Page 141

Page 142

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 January 2024
Budget Details
Variance Analysis
Variance
Requisition (CJP) 1,697 63 (1,634) -96% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Use of Reserves (6,474) (7,717) (1,243) 19% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This cost represents the payment made to HSCP in relation to the Criminal
Justice Partnership
Historically the budget has been set to include the Criminal Justice ringfenced
expenditure (£1.634m) and the (CPP) Community Justice Transitional Funding
(£0.063m). However, the ringfenced expenditure is directly incurred by HSCP;
with the associated ringfenced Scottish Government funding being paid direct to
the HSCP and as such has been removed from the projected council spend and
the projected council income.  Overall, this is a nil effect to the Council's
budgetary control outturn. The forecast outturn remaining, represents the
payment due to HSCP with regards the CPP element (£0.063m) which the
council receives as part of the RSG and is due to be paid over to the HSCP.
None Required
Overall, nil impact on outturn position.
This budget represents the use of General Fund Reserves.
The budgeted amount of reserves reflects the amount that was required to
balance the budget at the beginning of the financial year.  Since then, additional
amounts have been identified for use, from within the earmarked balances,
including the use of the smoothing fund, to fund the cost of those savings options
which will not be achieved fully in year as identified in Appendix 4.
None Required
A favourable variance is anticipated
Requisition (Criminal Justice Partnership)
Resources
Page 142

Page 143

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2023/24
Efficiency Detail Ref Chief Officer Budgeted Amount £ 
Projection of Total
Saved £ 
Projection of Total Not
Saved £ Comment
1
Reduce West Dunbartonshire Leisure Trust's management fee  by
10% CCF03 A  Graham 416,000 416,000 -
2 Clydebank Town Hall CCF04 A  Graham 130,000 130,000 -
3 Review Events Programme CCF07 A  Graham 32,000 32,000 -
4 Facilities Management Restructure CCF08 A  Graham 64,000 64,000 -
5 Community Planning Provision CCF10 A  Graham 22,000 22,000 -
6 Citizen, Culture and Facilities General Efficiencies CCF11 A  Graham 40,000 40,000 -
7
Contribution from the Dumbarton Common Good Fund to support
the purchase of library resources CCF14 A  Graham 10,000 10,000 -
8
Remove two posts across the Communications, Culture and
Performance areas CCF16 A  Graham 80,000 80,000 -
9 Allocate cost of Repair Contact Centre to HRA CCF17 A  Graham 120,000 120,000 -
10 Reduce opening hours and/or days across the library network CCF18 A  Graham 95,000 95,000 -
11
Review provision of library services within the school estate  to
consider part time or term time only provision CCF19 A  Graham 20,000 20,000 -
12
Reduce staff numbers in the  Customer Contact Centre and
promote a digital first approach encouraging more residents to
self serve and submit enquiries via the Council website. CCF20 A Graham 90,000 90,000 -
13 Income from Animal Feed Inspections RR01 A Douglas 14,000 14,000 -
14 Remove additional EHO posts Budget RR02 A Douglas 105,000 105,000 -
15
Remove a vacant section head post within Regularity and
Regeneration Services RR05 A Douglas 70,000 70,000 -
16 Removal Of Residual Budget  for Trainee RR06 A Douglas 8,000 8,000 -
17 Revert Trading Standards Officer Post to Authorised Officer RR07 A Douglas 13,000 13,000 -
18 Charging for Pre application advice RR09 A Douglas 10,000 10,000 -
19 Value of Works for Building Warrants  RR10 A Douglas 5,000 5,000 -
20 Remove One Enforcement Officer Post RR11 A Douglas 26,000 26,000 -
21
Reduce support provided to local businesses and organisations
including  a reduction in officers within the Council's economic
development team RR12 A Douglas 169,000 169,000 -
22 End affiliations to some external organisations RR14 A Douglas 3,000 3,000 -
23 Remove a vacant Trading Standards Authorised Officer post RR14 A Douglas 42,000 42,000 -
24
Non regulated procurement under £2m to be carried out by
services and remove need for procurement monitoring activity for
contracts awarded under that threshold SDP01 A Douglas 110,000 110,000 -
STATUS: COMPLETE
Page 143

Page 144

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2023/24
Efficiency Detail Ref Chief Officer Budgeted Amount £ 
Projection of Total
Saved £ 
Projection of Total Not
Saved £ Comment
25
Non-Complex procurement  to be carried out by services and
remove need for procurement monitoring activity for those
contracts SDP02 A Douglas 148,000 148,000 -
26
Review and improve purchase to pay administration procedures
reducing the need for Corporate Procurement Unit support and
allowing services to fully undertake purchase to pay  activities SDP03 A Douglas 99,000 99,000 -
27 Historical Lease Review SDP06 L Slavin 55,000 55,000 -
28 Consultancy Services Reduction SDP08 G Macfarlane 82,000 82,000 -
29 Reduce Consultancy Services and Capital Investment Team SDP11 G Macfarlane 212,000 212,000 -
30 Structural Patching RN07 G Macfarlane 150,000 150,000 -
31 Environmental Trust Grant Reduction RN17 G Macfarlane 87,000 87,000 -
32
Fund the Outreach Support Service for children and families
through the Family Wellbeing Fund. EDU04 L Mason 212,000 212,000 -
33 Education Performance Budget EDU10 L Mason 25,000 25,000 -
34 Instrumental Technician EDU14 L Mason 37,000 37,000 -
35 Labour increase in turnover target LAB ITEM L Slavin 250,000 250,000 -
36
Reduce the size of the Council's Audit & Fraud team by removing
1.8TE of vacancies rising to 2.8 in future years RES01 L Slavin 75,000 75,000 -
37 Clydebank Property Company RES02 L Slavin 30,000 30,000 -
38
Remove voluntary grant funding provided to West Dunbartonshire
Community & Volunteering Services and reduce funding provided
to the Clydebank Asbestos Group by 25% RES04 L Slavin 17,000 17,000 -
39 Reduce Reconciliation Team RES07 L Slavin 75,000 75,000 -
40 Close Municipal Bank RES08 L Slavin 40,000 21,764 18,236
Additional one off costs incurred in the closure of the bank.  The
unachieved amount of saving will be funded from the Smoothing
Fund for 2023/24.  However, it is anticipated that the full saving will
be achieved in future years.
41
Increase the  Council’s annual turnover savings target from
£2.698m to £3.410m RES09 L Slavin 712,000 712,000 -
42
Reduce the size of the Council's Insurance Management team
from four officers to three. RES10 L Slavin 50,000 50,000 -
43
Reduce manual processing by automating the generation of
debtor and creditor invoices RES11 L Slavin 25,000 25,000 -
44 Central Admin Support Printing RES12 L Slavin 12,500 12,500 -
45 Education Lets RES13 L Slavin 12,500 12,500 -
46 100% Electronic Payments RES14 L Slavin 2,000 2,000 -
47 Remove TeamMate RES15 L Slavin 8,000 8,000 -
48 Remove discretionary element of long term empty properties  RES17 L Slavin 52,000 52,000 -
49 Sales, Fees and Charges 10% Increase RES19 L Slavin 394,000 394,000 -
Page 144

Page 145

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2023/24
Efficiency Detail Ref Chief Officer Budgeted Amount £ 
Projection of Total
Saved £ 
Projection of Total Not
Saved £ Comment
50
Reduce the size of the Council's Automation team from three to
two in 2023/24 and by a further one in 2024/25 RES21 L Slavin 37,500                         37,500                      -                                    
51 Right size the Building Insurance Income budget RES23 L Slavin 80,000                         80,000                      -                                    
52
Right size the Strathclyde Passenger Transport and Valuation Joint
Board Budgets RES24 L Slavin 77,000                         77,000                      -                                    
53
Remove the Provost Hospitality Fund  which is used for hospitality
for provost hosted events  and for commemorating special events
within the community RES05 L Slavin 9,000                            9,000                         -                                    
54 Review of Capital Programme  RES06 L Slavin                         295,000 295,000                    -                                    
55
Reduce anti-social behaviour service by removing
backshift/weekend provision and limiting to phone provision
within normal office hours. HE01 P Barry 127,000                       127,000                    -                                    
56 Remove or reduce the Modern Apprenticeship Pathway Scheme HE02 P Barry 50,000                         50,000                      -                                    
57 Ashton View Rent HE03 P Barry                          10,000 10,000                      -                                    
58 Community Budgeting HE05 P Barry                            6,000 6,000                         -                                    
59 Driving Lessons HE06 P Barry                          48,000 48,000                      -                                    
60 Reduce the Working 4U Service by up to 25% HE07 P Barry 1,145,000                    1,145,000                 -                                    
61
Reduce funding provided to West Dunbartonshire Citizen Advice
Bureau by up to 90% HE08 P Barry 87,000                         87,000                      -                                    
62 WFU - Withdraw Flexible Options HE09 P Barry                          39,000 39,000                      -                                    
63 Reduce funding provided to Y-Sort-it by up to 90% HE10 P Barry 39,000                         39,000                      -                                    
64 Reduce the number of Tenant Liaison Officers from four to two HE11 P Barry 99,000                         99,000                      -                                    
65 Mitchell Way Office Accommodation Rent HE12 P Barry 42,000                         42,000                      -                                    
66 Reduce the level of  funding available to Community Councils HE13 P Barry 11,000                         11,000                      -                                    
67 Reduction in Colour Printing PT03 V Rogers                          12,000 12,000                      -                                    
68 Remove surplus budget in People & Change team PT04 V Rogers 29,000                         29,000                      -                                    
69 Reduction in ICT Management PT06 V Rogers 50,000                         50,000                      -                                    
70 Reduction in ICT Support PT07 V Rogers 82,000                         82,000                      -                                    
70                    6,930,500                   6,912,264                                18,236 TOTAL COMPLETE
Page 145

Page 146

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2023/24
Efficiency Detail Ref Chief Officer Budgeted Amount £ 
Projection of Total
Saved £ 
Projection of Total Not
Saved £ Comment
1
Co-locate Dalmuir Library and Dalmuir Community Centre within
the existing Community Centre building CCF01 A  Graham 14,000                         14,000                      -                                    
2
Consider further options for co-location and closure - in particular
potential options for Balloch, Parkhall, Duntocher, Faifley and
Dalmuir CCF02 A  Graham 50,000                         50,000                      -                                    
3 Income Generation through Commercialisation CCF05 A  Graham                          44,000 44,000                      -                                    
4
Generate additional income through commercialisation
opportunities at Church Street, Bruce Street Baths and Aurora
House including letting available space to third parties. CCF06 A  Graham 77,000                         77,000                      -                                    
5
Reduce community facility provision across West Dunbartonshire
to a level more consistent with neighbouring local authorities 
through a combination of closure and community asset transfers.
Reduction of 7.8 FTE in WDLT staff CCF13 A  Graham 257,000                       257,000                    -                                    
6 Office/ Depot Rationalisation SDP05 L Slavin                        380,000 98,344                      281,656                           
New tenants for 3 properties not achieved.  Minimum running costs
currently being charged.  Balance not achieved relates to forgone
rental income.  23/24 shortfall to be funded from the smoothing
fund and asset management continue to market sites with a view to
achieving the full saving in 24/25.
7 Commercialisation of Assets (Pavilions/Cafés) SDP07 L Slavin                          41,000 41,000                      -                                    
8 External Consultancy Income SDP09 G Macfarlane                          50,000 50,000                      -                                    
9
Review the use of Municipal Buildings to identify alternative uses
or commercial opportunities SDP14 L Slavin 37,000                         -                             37,000                             
Discussions have been ongoing with prospective tenants but not yet
realised.
10
Review possible early closure of Clydebank Town Centre Office
with employees based there relocated to alternative Council
accommodation SDP15 L Slavin 108,000                       -                             108,000                           
Minimum running costs currently being charged.  Balance not
achieved relates to forgone rental income.  23/24 shortfall to be
funded from the smoothing fund and asset management continue to
market site with a view to achieving the full saving in 24/25.
11 Civic Waste Amenity Sites RN02 G Macfarlane                          63,000 63,000                      -                                    
12 Residual Waste Optimisation RN03 G Macfarlane                        138,000 138,000                    -                                    
13
Review the charging policy for the Care of Gardens scheme or
remove provision entirely RN04 G Macfarlane 211,000                       211,000                    -                                    
14 Parking Enforcement RN05 G Macfarlane                        100,000 100,000                    -                                    
15
Reduce or remove the provision of weekend litter collection at key
destinations such as parks and town centres RN06 G Macfarlane 47,000                         47,000                      -                                    
16
Reduce provision of grass cutting, bin clearing, litter collection and
street sweeping RN09 G Macfarlane 460,000                       460,000                    -                                    
17
Improve recycling rates through a review of the programme  of
residual waste collection RN10 G Macfarlane 50,000                         50,000                      -                                    
STATUS: IN PROGRESS
Page 146

Page 147

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2023/24
Efficiency Detail Ref Chief Officer Budgeted Amount £ 
Projection of Total
Saved £ 
Projection of Total Not
Saved £ Comment
18 Electric Vehicle Charging RN13 G Macfarlane 91,000 91,000 -
19
Transfer the provision of Christmas lights to community groups or
traders associations with assistance provided by the Council at
switch on events RN15 G Macfarlane 25,000 25,000 -
20 Remove Additional Deprivation Allowance EDU02 L Mason 654,000 654,000 -
21
Reduce the number of learning assistants in schools by 2.34 FTE
from the current establishment of  28 FTE. EDU03 L Mason 32,000 32,000 -
22 Reduce General School Budgets EDU05 L Mason 200,000 200,000 -
23 Curriculum Development EDU06 L Mason 100,000 100,000 -
24
Reduce the school clothing grant to the statutory level of £120 for
primary school children and £150 for secondary school children EDU07 L Mason 774,000 774,000 -
25
Reduce the provision of School Travel to the national statutory
limits EDU08 L Mason 200,000 185,000 15,000 Per Education Committee July 2023
26
Reduce the budget for grounds maintenance and either reduce
frequency of grass cuts in educational premises or create areas of
biodiversity which would not require grass cutting EDU15 L Mason 100,000 100,000 -
27
Review the role of  Senior Early Learning and Childcare Officers 
enabling the removal of six Early Learning and Childcare Officers
posts EDU17 L Mason 119,000 119,000 -
28
Reduce accountancy provision by removing one vacant post and
transferring 70% of a post to work charged to the HRA RES22 L Slavin 73,000 73,000 -
29
Reduce the Communities Team by 50% or Restructure
Communities Team by bringing W4U Youth Learning Team and
wider Community Planning support into the Communities Team HE04 P Barry 383,000 191,500 191,500
The unachieved amount of saving will be funded from the
Smoothing Fund for 2023/24.  However, it is anticipated that the full
saving will be achieved in future years.
29 TOTAL IN PROGRESS 4,878,000 4,244,844 633,156
99 11,808,500 11,157,108 651,392 TOTAL EFFICIENCIES/MANAGEMENT ADJUSTMENTS
Page 147

Page 148

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
MONITORING OF EARMARKED BALANCES 2023/24 BY DEPARTMENT
DEPARTMENT  Revised
2023/24
Budget 
Actual Spend as
at Period 10
2023/24 
Projected
Spend 2023/24 
Expected
released in
2023/24 
Expected to be
carried forward
into 2024/25 
£  £  £  £  £
RESOURCES
1 Barclay Review Implementation: SG Funding for standardised NDR
billing & publication relief recipients
12,637 -   1,450 11,187  
2 DHP income 49,687 49,687 49,687 -  
3 Social Welfare Fund carry forward from 22/23 94,608 94,608 -
REGULATORY & REGENERATION
4 W4B Business Awards 13,090 13,090 13,090 -
5 Zero carbon (carried forward from  20/21) 38,000 38,000
6 Regulatory -  Econ Development- Business Awards 1,950 1,950 1,950 -
7 Previous provision for equal pay/holiday pay 209,859 209,859
8 Regulatory -  Econ Development- Business Awards 6,000 3,580 3,580 -   2,420
9 Regulatory - Underspend in 'design panel' budget for IDOX upgrade 12,000 9,575 12,000 -   -
PEOPLE & TECHNOLOGY
10 OD & Change Training Budget 64,935 63,893 64,935 -
11 Automation Team (VKY) 30,284 4,000 4,000 26,284
CITIZENS, CULTURE & FACILITIES
12 Library Improvement Fund 12,500 12,500 -
13 Community focused activity programme in Alexandria Library 6,000 6,000 -
14 Events Income & spend-Comms & Marketing 1,000 1,000 -
15 Arts & Heritage - re-installation of artworks in Clydebank Town Hall 6,305 6,305 6,305 -
EDUCATION
16 Education recovery (ELT) 210,325 210,325 210,325           -
17 Holiday Hunger 100,000 100,000 100,000           -
18 Probationers 474,000 94,800 474,000           -
19 Whole Family Wellbeing Funding 328,697 214,422 328,697           -
20 Ending Core curriculum charges 129,000 25,800 129,000           -
21 Removal of music instruction fees 47,000 9,400 47,000 -
HOUSING & EMPLOYABILITY
22 Parental Employee Support Fund Boost 114,000 - 114,000           - -
23 Modern Apprentice 22/23 underspend 250,000 160,508 250,000           -
24 Communities - comm empowerment budget 15,000 - - 15,000 -
25 Housing green growth retermination 26,000 - - 26,000
Page 148

Page 149

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
MONITORING OF EARMARKED BALANCES 2023/24 BY DEPARTMENT
DEPARTMENT  Revised
2023/24
Budget 
Actual Spend as
at Period 10
2023/24 
Projected
Spend 2023/24 
Expected
released in
2023/24 
Expected to be
carried forward
into 2024/25 
£  £  £  £  £
MISCELLANEOUS SERVICES
26 Be the best unspent monies (Good Idea Fund) 4,743 4,743 -
27 ERO Expenditure - required to be c/f within WDC balance sheet, re
VJB
26,145 26,145 -
CHANGE FUND
28 Direct debit functionality 2,000 - - 2,000 -
29 SIP Telephony project 118,000 118,000           - -
30 50% Grade 5 Post recharge from People & Technology (Final Year) 18,769 - 18,769 - -
COST OF LIVING
31 22/23 Cost of Living b/fwd -Committed          1,664,121 217,974 380,221           - 1,283,900          
32 22/23 Cost of Living b/fwd - UnCommitted 174,599 - - - 174,599
OTHER
33 Voluntary Redundancy & Early Retirement Reserve (fund from one
off service concessionary benefit)
8,962,000 - 2,000,000        - 6,962,000          
34 Smoothing Fund for 2 year Service Transformation Programme 
(fund from one off service concessionary benefit)
3,000,000 702,931 702,931           - 2,297,069          
35 Budget funding reserve (funded from smoothing Fund)         4,598,000 - 4,598,000        - -
36 Scottish Government Pay Award Funding Provided as Capital funds
in 22/23 & 23/24  (fund from one off service concessionary benefit)
2,195,000 - 2,195,000        - -
37 Prudential Target (Future Years)         1,798,595 - 1,798,595         -
TOTAL 24,814,849      1,888,240 11,963,193     1,820,338         11,031,318       
Page 149

Page 150

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
GENERAL SERVICES CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
PERIOD END DATE
PERIOD 10
Spend to Date Spend to
Date
£000 £000
Red
61 67.0% 76,769 90.0% 61 67.0% 11,833          74.1%
Amber
0 0.0% 0 0.0% 0 0.0% 0 0.0%
Green
30 33.0% 8,544 10.0% 30 33.0% 4,131 25.9%
91 100% 85,313 100% 91 100% 15,964 100%
Budget Spend to
Date
Forecast
Spend
Forecast
Variance Budget Spend to
Date
Forecast
Spend
Actual
Variance Re-profiling Over/ (Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
219,918 76,769          221,407 1,489 83,311 11,833 23,915 (59,397) (59,786) 388
0 0 0 0 0 0 0 0 0 0
13,445 8,544 13,187 (258) 8,887 4,131 8,888 0 0 0
233,363 85,313 234,594 1,231 92,199 15,964 32,803 (59,397) (59,786) 388
(233,363) (85,313) (234,594) (1,231) (92,199) (15,964) (32,803) 59,397
0 (0) 0 (0) (0) 0 0 (0)
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 January 2024
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of Projects
at RAG Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Number of
Projects at RAG
Status
% Projects at
RAG Status
% Project
Spend at
RAG Status
Red
Projects are forecast to be overspent and/or experience material delay
to completion
Amber
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are either at risk of being overspent and/or delay in completion
(although this is unquantifiable at present) or the project has any issues
that require to be reported at this time
Green
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Amber
Page 150

Page 151

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 50 43 86% 50 0 0%
Current Year Financials 7 0 0% 0 (7) -100%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-24
2
Project Life Financials 30 5 16% 30 0 0%
Current Year Financials 25 0 0% 0 (25) -100%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 30-Sep-23 30-Nov-23
3
Project Life Financials 30 65 218% 65 35 117%
Current Year Financials 23 21 92% 58 35 157%
Project Description
Project Manager Adrian Gray
Chief Officer Laurence Slavin
Project Lifecycle 30-Apr-24 30-Apr-24
4 IFRS 16 Database
Project Life Financials 5 0 0% 5 0 0%
Current Year Financials 5 0 0% 0 (5) -100%
Project Description
Project Manager Jackie Nicol Thomson
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-23 31-Mar-24
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Mitigating Action
None required at this time.
Anticipated Outcome
Upgraded Electronic Insurance System.
Enhancements to Cash Receipting System
To enhance the cash receipting system in the way payments are made and allocated to back office by increasing the level
of security that is required for online payments made by customers
Electronic Insurance System
Acquisition of a claims/incident management system supported by an electronic document management system.
Planned End Date Forecast End Date
Main Issues / Reason for Variance 
Budget has been reprofiled to Financial Year 2024-2025.
Anticipated Outcome
Enhancements to the cash receipting system including PCI compliant telephone payment system.
Agresso development
The purpose of this project is to carry out an upgrade of the Agresso Finance System which was last upgraded in 2015. The
requirement to upgrade is to maintain a level of support available from Unit 4 who have advised that support for older
versions of the system is being reduced.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Budget has been reprofiled to Financial Year 2024-2025. Version 2 of the upgrade was completed Jan 2023.  Call Secure Module went Live in October 2023.
Mitigating Action
None required at this time.
This is a system which will ensure that WDC has the correct level of information and adheres to correct reporting of IFRS16 -
Leasing. 
Planned End Date Forecast End Date
Main Issues / Reason for Variance
IFRS16 has been postponed and is due for implementation this financial year. It is anticipated that full spend will be incurred by 31 March 2024.
Main Issues / Reason for Variance
Work to significantly reduce the database size to facilitate a system upgrade has now been completed. Upgrade work can now commence, ICT currently building required
servers in preparation for new version to be installed, configured and tested.
Mitigating Action
None required
Anticipated Outcome
Anticipate completion of upgrade during 23-24 financial year.
Mitigating Action
None available at this time.
Anticipated Outcome
Completion of project by 31 March 2024
Page 151

Page 152

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System5
Project Life Financials 1,590 50 3% 1,590 0 0%
Current Year Financials 1,590 0 0% 50 (1,540) -97%
Project Description
Project Manager Michelle Lynn
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-24 31-Mar-25
6
Project Life Financials 1,150 1,150 100% 1,150 (0) 0%
Current Year Financials 5 2 33% 5 0 0%
Project Description
Project Manager Michelle Lynn
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 30-Apr-23
7
Project Life Financials 2,980 2,949 99% 2,980 0 0%
Current Year Financials 2,980 1,260 42% 2,970 (9) 0%
Project Description
Project Manager Michelle Lynn
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-24 31-Mar-24
8
Project Life Financials 349 9 3% 349 0 0%
Current Year Financials 340 0 0% 0 (340) -100%
Project Description
Project Manager Michelle Lynn
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-24 31-Mar-25
Main Issues / Reason for Variance
This project is linked to Glencairn House and Depot Rationalisation and will free up the current museum store and office space in Poplar Road. Opportunities exist to
attract external funding. Detailed design work ongoing for Glencairn House.
Mitigating Action
None available at this time
Project delivered on budget with required specifications
Strathleven Place
Re-development of Strathleven.
Planned End Date Forecast End Date
Mitigating Action
None required.
Anticipated Outcome
To create new community facilities with additional space for early years provisions.
Building Upgrades and H&S - lifecycle & reactive building upgrades
Lifecycle and reactive building upgrades.
Dalmonach CE Centre
To create new community facilities with additional space for early years provisions.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete and final account to be agreed.
Anticipated Outcome
Projects delivered to required specifications
New Sports Changing Facility Dumbarton West (Old OLSP site) 
New Sports Changing Facility Dumbarton West (Old OLSP site) 
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing
Mitigating Action
None required at this time
Main Issues / Reason for Variance
No confirmation of start date can be confirmed until works commence on the wider housing site.
Mitigating Action
None available at this time
Anticipated Outcome
To deliver new sports changing facility.
Page 152

Page 153

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System9
Project Life Financials 150 296 197% 296 146 97%
Current Year Financials 134 227 170% 280 146 109%
Project Description
Project Manager Michelle Lynn
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-21 31-Mar-24
10
Project Life Financials 2,375 122 5% 2,375 0 0%
Current Year Financials 1,085 18 2% 31 (1,053) -97%
Project Description
Project Manager Michelle Lynn
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-22 31-Mar-25
11
Project Life Financials 33 33 100% 33 0 0%
Current Year Financials 33 0 0% 33 0 0%
Project Description
Project Manager Alan Douglas
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
12
Project Life Financials 155 145 93% 155 0 0%
Current Year Financials 10 0 0% 0 (10) -100%
Project Description
Project Manager Pamela Clifford
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
New Sports Changing Facility at Lusset Glen in Old Kilpatrick
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project had been delayed due to a number of COVID-19 related issues and utilities issues. Unit is now in production but delay to site due to the utility disconnection and
demolition works. Demolition works complete and waiting for a date for installation due to be complete by 31st March 2024.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Various delays due to Covid and other utility issues. Planning was previously delayed but now resolved. Building warrant applications submitted and tender to be issued. 
Anticipate going to tender at end February with a site start in spring 2024. Also awaiting confirmation of RCGF funding.
Mitigating Action
None available at this time
Mitigating Action
None available at this time
Anticipated Outcome
To deliver new sports changing facility.
New Westbridgend Community Centre
New Westbridgend Community Centre
Main Issues / Reason for Variance
Budget has been rephased from 2022/23. Project was originally delayed due to COVID19 restrictions and a decision was made to resume project once Microsoft 365 was
implemented. It is anticipated that the project will complete by 31 March 2024.
Mitigating Action
None available at this time.
Anticipated Outcome
Project will be delivered on budget
Anticipated Outcome
To deliver new community centre.
Legal Case Management System
Legal Case Management System
Planned End Date Forecast End Date
Demolition 215 Main Street Alexandria
Demolition of 215 Main Street Alexandria.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This outstanding money is being sought through the recharging order and through debtors.
Mitigating Action
No action required at this time in the hands of Legal
Anticipated Outcome
Continue to pursue repayment
Page 153

Page 154

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System13
Project Life Financials 61 61 100% 61 (0) 0%
Current Year Financials 58 1 1% 58 0 0%
Project Description
Project Manager Rachel Moir
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-25
14
Project Life Financials 87 85 97% 87 0 0%
Current Year Financials 79 85 107% 85 5 7%
Project Description
Project Manager Rachel Moir
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-24
15
Project Life Financials 20 20 100% 20 0 0%
Current Year Financials 7 1 19% 7 0 0%
Project Description
Project Manager Rachel Moir
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-24
16
Project Life Financials 290 64 22% 290 0 0%
Current Year Financials 227 1 0% 1 (226) -100%
Project Description
Project Manager Rachel Moir
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-24
17
Project Life Financials 16,154 1,105 7% 16,154 0 0%
Current Year Financials 2,933 224 8% 511 (2,422) -83%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-25
Installation of Solar PV at Clydebank Leisure Centre
Installation of Solar PV at Clydebank Leisure Centre.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Tender works delayed due to Energy Officer being off sick. Work underway and will be undertaken in 24/25.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works are currently being undertaken to upgrade controls in Clydebank Town Hall.
Mitigating Action
None Required.
Mitigating Action
None required
Anticipated Outcome
Works to be undertaken in 24/25
Replace existing main hall Air Handling unit at Clydebank Town Hall
Replace existing main hall Air Handling unit at Clydebank Town Hall.
Main Issues / Reason for Variance
Expected completion in 24/25
Mitigating Action
None required.
Anticipated Outcome
Delivery of project with full budget spend.
Anticipated Outcome
Replace existing main hall Air Handling unit at Clydebank Town Hall.
Replace failed heating controls/valves & recommission
Replace failed heating controls/valves & recommission.
Planned End Date Forecast End Date
Mitigating Action
Energy team to remain involved for update and communicate any potential additional costs.
Anticipated Outcome
Delivery of project with full budget spend.
Leisure Energy projects - air handling units, upgrade lighting, circulating pumps, and draught proofing
Measures to be installed at both Meadow Centre & Vale of Leven Swimming Pool; new pool hall Air Handling Units, upgrade
lighting, circulating pumps Vale of Leven Swimming Pool, internal and external lighting and draught proofing.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works have been delayed due to flooding issues. Tender process due to be undertaken shortly; however, due to additional issues identified, the current budget may
require review.
Regeneration/Local Economic Development
Budget to facilitate the delivery of Regeneration throughout West Dunbartonshire, aligned to the Economic Strategy.
External funding will be sought to maximise opportunities for redevelopment of these sites.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
LED budget is invested across our town centres and strategic sites and is used to develop and implement projects as well as providing match funding to lever in external
funding. During 2023/2024 the key projects to be developed and delivered include a Alexandria Town Centre Masterplan projects (Smollet Fountain, Green heritage
Corridors), and in Clydebank implementation of the Development Framework. Many regeneration projects are subject to factors outwith Council control and close
monitoring of the programming is required. Enabling works at Mitchell Way  have been delayed as they are subject to the timescale of the developer. Activity Centre in
Clydebank is delayed and now planned to be delivered in 2024/2025. A contingency is included for increasing costs and new funding opportunities.
Mitigating Action
none required
Anticipated Outcome
projects delivered on time and on budget
Page 154

Page 155

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System18
Project Life Financials 5,064 4,898 97% 5,064 0 0%
Current Year Financials 4,098 0 0% 274 (3,824) -93%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-25
19
Project Life Financials 2,869 1,617 56% 2,869 0 0%
Current Year Financials 1,147 0 0% 837 (310) -27%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 31-Mar-24
20
Project Life Financials 747 40 5% 747 0 0%
Current Year Financials 707 0 0% 0 (707) -100%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Dec-22 30-Jun-24
21
Project Life Financials 320 159 50% 320 0 0%
Current Year Financials 221 60 27% 60 (161) -73%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-23 30-Jun-24
22
Project Life Financials 22,100 7,229 33% 22,100 0 0%
Current Year Financials 19,984 3,257 16% 5,113 (14,871) -74%
Project Description
Project Manager Gillian McNamara
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-25 31-Mar-25
Funding to implement major regeneration projects linked to community charrettes. 
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Progress being made by Malin Group with expenditure of Clyde Mission funding at the Scottish Marine Technology Park. Remaining projects are multi-year.
Regeneration Fund
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Projects continue to be progressed. 23/24 allocation will be distributed as capital grants.
Mitigating Action
None required at this time
Mitigating Action
Anticipated Outcome
Projects delivered on time and on budget
Place Based Investment Programme
Scottish Government Funding to establish a Place-Based Investment Programme to ensure that all place based
investments are shaped by the needs and aspirations of local communities.
Main Issues / Reason for Variance
Kier is appointed to design and deliver the Activities Centre at Clydebank Town Centre. Design of the project is underway and a commencement date for construction will
be later in 2024.
Mitigating Action
None available at this time
Anticipated Outcome
Projects delivered on budget
Anticipated Outcome
Projects delivered on budget
Clydebank Can On The Canal
New activities centre in Clydebank Town Centre.
Planned End Date Forecast End Date
Mitigating Action
None available at this time
Anticipated Outcome
Projects delivered on budget
LUF
Year one LUF spend includes acquisition cost of Artizan Centre, and design development for Glencairn House and
Connecting Dumbarton
Levelling Up Capacity
Successful LUF applications that meet UK Government's over-riding objective of Levelling Up and transformational
regeneration.
Planned End Date Forecast End Date
Main Issues / Reason for Variance 
This capacity funding is used to fund consultancy work associated with current and future LUF projects development.
Anticipated Outcome
Projects delivered on budget
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Artizan Masterplan approved by IRED in Nov 2023, deigns progressing as planned but some delay to early enabling works (demolition) and commencement of the
delivery phase (Glencairn House).
Mitigating Action
None available at this time
Page 155

Page 156

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System23
Project Life Financials 11,064 100 1% 11,064 0 0%
Current Year Financials 7,209 3 0% 100 (7,109) -99%
Project Description
Project Manager Patricia Rowley/ Craig Jardine
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
24
Project Life Financials 2,749 2,373 86% 2,749 0 0%
Current Year Financials 814 420 52% 425 (389) -48%
Project Description
Project Manager Michelle Lynn
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-23 30-Sep-24
25
Project Life Financials 449 319 71% 449 0 0%
Current Year Financials 446 13 3% 260 (186) -42%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 30-Sep-24
26
Project Life Financials 58 45 77% 58 0 0%
Current Year Financials 13 0 0% 13 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-24
27
Project Life Financials 250 14 6% 250 0 0%
Current Year Financials 250 0 0% 0 (250) -100%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-25
District Heating Network Expansion
District Heating Network Expansion.
Planned End Date Forecast End Date
Main Issues / Reason for Variance  
Network expansion to GJNH (Golden Jubilee National Hospital) will commence pending approval to proceed by the GJNH Board including agreeing tariff rates .  Unable
to confirm exact programme until approval has been given.
Mitigating Action
Network expansion to Golden Jubilee is discussed at every District Heating Project Board
Anticipated Outcome
Project to be delivered on programme and within budget once it has been fully set.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Administration budget commitment.  All projects progressing.
Mitigating Action
Unallocated budget to be taken per Council savings option 
Heritage Capital Fund
Heritage Capital Fund.
Anticipated Outcome
Budget to be taken per Council savings option 
Allotment Development
To develop an allotment site.
Anticipated Outcome
Additional allotments delivered within budget
Kilmaronock Cemetery Expansion
Expansion of existing cemetery at Kilmaronock. 
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works Progressing
Mitigating Action
None required at this time.
Cemetery Extension, North Dalnotter
Cemetery Extension, North Dalnotter
Planned End Date Forecast End Date
Main Issues / Reason for Variance
North Dalnotter will now be delivered in financial year 24/25
Main Issues / Reason for Variance
Project Underway
Mitigating Action
None available at this time
Anticipated Outcome
Sustainable burial environment for local residents.
Mitigating Action
None required at this time.
Anticipated Outcome
Sustainable burial environment for local residents.
Page 156

Page 157

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System28
Project Life Financials 3,576 5,305 148% 5,305 1,729 48%
Current Year Financials 864 1,223 142% 1,260 396 46%
Project Description
Project Manager Craig Jardine
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-24
29
Project Life Financials 817 817 100% 817 (0) 0%
Current Year Financials 529 401 76% 529 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-25
30
Project Life Financials 395 0 0% 395 0 0%
Current Year Financials 385 0 0% 0 (385) -100%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-25
31
Project Life Financials 739 90 12% 739 0 0%
Current Year Financials 380 32 8% 32 (349) -92%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-28 31-Mar-28
32
Project Life Financials 600 10 2% 600 0 0%
Current Year Financials 200 0 0% 10 (190) -95%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 30-Nov-23 31-Mar-25
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Scottish Water connection now complete.  Programme to completion being finalised by Contractor, anticipated completion date is now 15 March 24.
Mitigating Action
None available at this time
Posties Park Sports Hub - New sports hub to include gym & running track
Creation of a sports hub at Posties/Marinecraft to include a new changing pavilion/Gym, new all-weather 6 lane running
track, conversion of blaze sports pitch to grass, new fencing, upgrade of existing floodlights and additional car parking.  This
combines the budget approved by the Council in February 2015 for Community Sports Facilities at Posties Park, draw down
of budget from the generic sports facilities budget line.
Anticipated Outcome
New sports Hub delivered
Mitigating Action
None available at this time.
Anticipated Outcome
Extension to existing cemetery providing a sustainable burial environment.
East End Park Resurfacing
Resurfacing of 3G pitch at East End Park.
Vale of Leven Cemetery Extension
Extension of existing cemetery in Vale of Leven.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project will be completed Summer 2024
Anticipated Outcome
Resurfacing of 3G pitch at East End Park.
Play Parks Grant Funding
Renew and replace play park equipment
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
External funding confirmed and design commencing.
Mitigating Action
None required.
Balloch Mountain Bike Track
Develop a mountain bike skills trail at Balloch Castle Country Park.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Design undertaken this financial year.
Main Issues / Reason for Variance
Tender documentation complete, commencement programmed February 24.
Mitigating Action
None required at this time.
Anticipated Outcome
Renewal of play parks
Mitigating Action
None required at this time.
Anticipated Outcome
Develop a mountain bike skills trail at Balloch Castle Country Park.
Page 157

Page 158

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System33
Project Life Financials 217 3 1% 3 (214) -99%
Current Year Financials 214 0 0% 0 (214) -100%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
34
Project Life Financials 561 0 0% 561 0 0%
Current Year Financials 561 204 36% 361 (200) -36%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
35
Project Life Financials 400 400 100% 400 0 0%
Current Year Financials 42 0 0% 42 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
36
Project Life Financials 315 315 100% 315 0 0%
Current Year Financials 56 0 0% 56 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-24
37
Project Life Financials 500 32 6% 500 0 0%
Current Year Financials 500 32 6% 350 (150) -30%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Mitigating Action
None available at this time.
Anticipated Outcome
To improve journey times and reliability of bus services.
Cycling, Walking and Safer Streets
Introduction of enhanced walking routes and traffic calming schemes to introduce safer streets within West Dunbartonshire.
Bus Rapid Deployment Fund
Funding has been awarded from Sustrans to assist with social distancing measures required as a result of the COVID-19
pandemic.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Funding no longer available
Anticipated Outcome
To improve connectivity and enhanced Cycling routes within West Dunbartonshire.
Auld Street Clydebank - Bond
Footpath still to be done after xmas spend.  Part funded by Golden jubie £20k.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works for a footway/cycleway improvement at Bellsmyre Avenue are now complete. Dropped kerbs at various locations are underway. Proposed further works to
cycleways due to commence late 2023.
Mitigating Action
None required at this time.
Main Issues / Reason for Variance
Works instructed for link path to be combined with Golden Jubilee Active travel contributions
Mitigating Action
None available at this time.
Anticipated Outcome
To complete remaining civil works required.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Balloch Park 50kw EVC to be upgraded.
Mitigating Action
None required at this time.
Electrical Charging Points - Rapid Charge
Funding has been awarded from Transport Scotland for the Installation of electrical charging points
Anticipated Outcome
To provide Electric Vehicle Charging points within West Dunbartonshire.
Mitigating Action
None required at this time.
Anticipated Outcome
Projects should be complete within budget.
Flood Prevention
Various flood prevention projects.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Limited uptake om property level protection
Page 158

Page 159

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System38
Project Life Financials 800 181 23% 800 0 0%
Current Year Financials 620 0 0% 0 (620) -100%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-26
39
Project Life Financials 2,277 1,247 55% 2,277 0 0%
Current Year Financials 650 80 12% 450 (200) -31%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
40
Project Life Financials 97 97 100% 97 (0) 0%
Current Year Financials 29 29 99% 29 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
41
Project Life Financials 15,053 1,054 7% 15,053 0 0%
Current Year Financials 1,530 0 0% 600 (930) -61%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-27
42
Project Life Financials 1,700 1,207 71% 1,700 0 0%
Current Year Financials 693 0 0% 200 (493) -71%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-26 31-Mar-27
River Leven Flood Prevention Scheme
River Leven Flood Prevention Scheme.
Anticipated Outcome
Project should be completed within budget.
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements & Park and Rides
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure improvements.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Awaiting outcome of Scottish Government & SEPA consideration of submitted study .
Mitigating Action
None required at this time.
Main Issues / Reason for Variance
For Bus Infrastructure a program of works Is being developed. For A8014 Kilbowie Rd works are being planned awaiting further feedback from Utilities, For A814
Congestion measures further development & expansion of vehicle detection systems and for Balloch P & R Consultants are appointed, agreement in principal with
Network Rail & further investigatory works are planned.
Mitigating Action
None required at this time.
Anticipated Outcome
Improve accessibility to Public Transport and improve journey time reliability.
Main Issues / Reason for Variance
Detailed design underway. Design will be completed 24/25
Mitigating Action
None available at this time.
Anticipated Outcome
Intention is to complete works within budget.
Depot Improvement Works
Improvement of WDC Roads Depot.
Planned End Date Forecast End Date
Mitigating Action
None available at this time.
Anticipated Outcome
Project should be completed within budget.
A813 Road Improvement Phase 1
A813 Road Improvement Phase 1.
Gruggies Burn Flood Prevention
Commission of Gruggies Flood Prevention Scheme.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Detailed design underway. Design will be completed 24/25
Anticipated Outcome
To provide an improved A813.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Initial works commencing March 23 with majority of works to be delivered 24/25
Mitigating Action
None required at this time.
Page 159

Page 160

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System43
Project Life Financials 134 65 49% 134 0 0%
Current Year Financials 134 0 0% 65 (69) -51%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
44
Project Life Financials 4,300 4,211 98% 4,300 0 0%
Current Year Financials 138 5 4% 50 (88) -64%
Project Description
Project Manager Sharron Worthington
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-22 31-Mar-24
45
Project Life Financials 1,400 500 36% 1,400 0 0%
Current Year Financials 1,400 0 0% 500 (900) -64%
Project Description
Project Manager Craig Jardine
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
46
Project Life Financials 3,314 455 14% 3,314 0 0%
Current Year Financials 3,314 455 14% 455 (2,859) -86%
Project Description
Project Manager Craig Jardine
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 30-May-24
47
Project Life Financials 1,980 200 10% 1,980 0 0%
Current Year Financials 1,980 0 0% 200 (1,780) -90%
Project Description
Project Manager Gail MacFarlane
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Dec-25
Roads Safety
Roads Safety
Planned End Date Forecast End Date
Clydebank Charrette, A814
Clydebank Charrette, A814
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works complete and on maintenance period - retention payment due prior to March 2024.
Main Issues / Reason for Variance
New funding which will be allocated to appropriate projects.
Mitigating Action
None required at this time.
Anticipated Outcome
Projects will be delivered on time.
Mitigating Action
None available at this time.
Anticipated Outcome
Project will enhance the A814 through Clydebank.
Vehicle Replacement Strategy
Replacement of refuse collection vehicles.
Anticipated Outcome
Replacement of refuse collection vehicles.
Vehicle Replacement
Replacement of vehicles which have reached end of programmed lifespan (7 year heavy vehicles, 10 year light vehicles).
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Bin lorries ordered and build slot allocated this financial year.
Mitigating Action
None available.
Waste Transfer Station
The design, development and construction of a recycling and bulk waste transfer facility that will ensure all recycling
material can be sorted and disposed off appropriately to ensure compliance with landfill ban in 2025.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Detailed design ongoing
Main Issues / Reason for Variance
Vehicles have been ordered including bin lorries, sweepers and tractors.  Expected delivery of bin lorries between April and July 2024.
Mitigating Action
None Required.
Anticipated Outcome
Replacement of fleet within budget.
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within budget.
Page 160

Page 161

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System48
Project Life Financials 33,491 7,946 24% 33,491 0 0%
Current Year Financials 11,845 1,917 16% 4,000 (7,845) -66%
Project Description
Project Manager Patricia Rowley
Chief Officer Gail McFarlane
Project Lifecycle 31-Mar-27 31-Mar-27
49
Project Life Financials 8,535 445 5% 8,535 0 0%
Current Year Financials 2,238 94 4% 100 (2,138) -96%
Project Description
Project Manager Craig Jardine
Chief Officer Gail McFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
50
Project Life Financials 250 20 8% 250 0 0%
Current Year Financials 250 0 0% 20 (230) -92%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
51
Project Life Financials 868 301 35% 868 0 0%
Current Year Financials 397 18 5% 40 (357) -90%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-29 31-Mar-29
52
Project Life Financials 376 355 94% 376 0 0%
Current Year Financials 41 0 0% 20 (21) -51%
Project Description
Project Manager David Jones/ Julie McGrogan
Chief Officer Laura Mason
Project Lifecycle 31-Mar-23 31-Mar-24
Exxon City Deal
As part of the City Deal project the WDC Exxon site at Bowling regeneration with alternative A82 route included.
Planned End Date Forecast End Date
Main Issues / Reason for Variance 
Regular updates are provided at every Council meeting and monthly Project Board meetings and to City Deal.  The main issues contained within the new Council's
approved Outline Business Case are still valid, which include Exxon's remediation strategy, land transfer arrangements and issues relating to adjoining owners.  WDC
Consultants are monitoring the remediation process to ensure compliance with specification, also Esso are independently monitoring the remediation works.  Final
Business Case submission was June 2023. Through the Scape framework we are working closely with Balfour Beatty to achieve a formal pre construction agreement to
allow the detailed design works to commence and the full construction programme to be developed. Agreements in principle are progressing with third party land owners.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Committee approval given to upgrade and improve depots.  Project delivery will be phased, work underway to determine phasing of spend and scope.  Garage facilities
will be treated as a priority
Mitigating Action
None available at this time
Mitigating Action
None Required
Anticipated Outcome
Delivery of the project on time and within the increased budget
Depot Rationalisation
Depot Rationalisation.
Anticipated Outcome
Deliver project outcomes within agreed budget
Mitigating Action
None Required.
Anticipated Outcome
Resurfacing of blaze pitch to 3G all weather surface
AV Equipment - Education
Purchase of AV Equipment for Education.
Pappert 2G pitch
Resurfacing of blaze pitch to 3G all weather surface
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Expecting work to commence in financial year 2024/25.
Anticipated Outcome
Purchase of AV Equipment for Education.
Digital Inclusion
Increase the ratio of chrome book devices for most disadvantaged children and families and support for families with remote
access.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Progressing as expected. Spend is not linear AV boards replaced as a when they fail.
Mitigating Action
None required at this time.
Main Issues / Reason for Variance
Delay in identifying appropriate cohort for project delivery. Current challenge is finding a suitable and available location.
Mitigating Action
None required at this time.
Anticipated Outcome
Increase the Chromebook ratio for most disadvantaged children.
Page 161

Page 162

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System53
Project Life Financials 20,621 16,090 78% 20,621 0 0%
Current Year Financials 4,222 489 12% 522 (3,700) -88%
Project Description
Project Manager Michelle Lynn/ Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
54
Project Life Financials 34,204 2,384 7% 34,204 0 0%
Current Year Financials 3,495 891 26% 1,579 (1,916) -55%
Project Description
Project Manager Craig Jardine
Chief Officer Laura Mason
Project Lifecycle 31-Mar-26 31-Jul-27
55
Project Life Financials 694 762 110% 694 0 0%
Current Year Financials 122 190 156% 190 68 56%
Project Description
Project Manager Michelle Lynn
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
56
Project Life Financials 8,628 8,723 101% 8,628 0 0%
Current Year Financials 287 110 38% 214 (72) -25%
Project Description
Project Manager Michelle Lynn
Chief Officer Laura Mason
Project Lifecycle 31-Mar-24 31-Mar-24
57
Project Life Financials 845 10 1% 845 0 0%
Current Year Financials 845 10 1% 766 (79) -9%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-24 31-Mar-24
Schools Estate Improvement Plan
Improvement of Schools Estate.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing in line with programme.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
The next phase of the Schools Estate Improvement Plan involves the development of a new Campus provision in the Faifley area. WDC has been successful in securing
funding from the Scottish Government Learning Estate Improvement Programme. SFT confirmed the indicative funding allocation for this project at £18.416m on the 4
May 2021, this will be received as a revenue stream over the 25 years of the Scottish Government financial support (subject to the Council adhering to the funding
criteria). Site Options Appraisal has taken place and Members approved the recommendation to proceed with the new Faifley Campus on the St Joseph's site at
Education Committee on 9th June 2021.  Work is progressing well to reach Financial Close by 19 February.  Planning permission has been agreed and Stage 1 Building
Warrant approved. 
Mitigating Action
None required at this time
Mitigating Action
None at this time
Anticipated Outcome
Project delivered within budget and to required specification
Schools Estate Improvement Plan - next Phase - Faifley Campus
Improvement of Schools Estate.
Main Issues / Reason for Variance
Provision of Capital Funding from Scottish Government to implement free school meal initiative.
Mitigating Action
None available at this time.
Anticipated Outcome
Project delivered within amended timescales.
Anticipated Outcome
Delivery of the project within budget and on time.
Free School Meals
Provision of Capital Funding from Scottish Government to implement free school meal initiative.
Planned End Date Forecast End Date
Mitigating Action
None at this time
Anticipated Outcome
The project will be completed to deliver the requirements of the Early Years expansion plans.
Aids & Adaptations - Special Needs Adaptations & Equipment
Reactive budget to provide adaptations and equipment for HSCP clients.
Early Years Early Learning and Childcare Funding
Early learning and childcare funding awarded to West Dunbartonshire Council to facilitate the expansion in entitlement to
funded ELCC to 1140 hours from August 2020.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing in 2023/24.
Anticipated Outcome
Provision of adaptations and equipment to HSCP clients as anticipated.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
There is likely to be a small underspend in the current year due to the implementation of the new system, however this will require to be carried forward to 2024/25 in light
of anticipated equip cost increases and as activity levels increase back to normal levels.
Mitigating Action
None available at this time
Page 162

Page 163

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Electronic Insurance System58
Project Life Financials 584 50 9% 584 0 0%
Current Year Financials 584 47 8% 50 (534) -91%
Project Description
Project Manager Alastair Handley
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-24 31-Mar-24
59
Project Life Financials 388 50 13% 388 0 0%
Current Year Financials 308 12 4% 50 (258) -84%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-24 31-Mar-24
60
Project Life Financials 19 3 14% 3 (16) -84%
Current Year Financials 19 3 14% 3 (17) -86%
Project Description
Project Manager Julie Slavin
Chief Officer Beth Culshaw
Project Lifecycle 31-Mar-24 31-Mar-24
61
Project Life Financials 60 50 83% 50 (10) -17%
Current Year Financials 10 0 0% 0 (10) -100%
Project Description
Project Manager James Gallacher
Chief Officer Victoria Rogers
Project Lifecycle 31-Oct-22 31-Mar-24
HSCP ICT Upgrade of systems
Review/replace the current case management systems.
Planned End Date Forecast End Date
Community Alarm upgrade
To upgrade Community Alarm
Planned End Date Forecast End Date
Main Issues / Reason for Variance
While there has been some movement on the project to date, progress is slow.  Procuring equipment that is fully compatible with the platform is the priority to enable
WDHSCP to best support the digital rollout, however delays from Scotland Excel has required an alternative procurement solution to be identified for a smaller scale
initial purchase.  The contract for the Digital ARC has been awarded and a test unit and access to the demo platform has been received with a plan to on-board
partnerships to the live platform in Spring 2024, while the process to formalise arrangements with East Dunbartonshire Council for the ARC cover for the calls is ongoing
with the cost for the call handling service still to be confirmed.
Main Issues / Reason for Variance
A HSCP Digital Strategy 2024-2027 is in development. The strategy will have an internal focus, identifying areas where the HSCP would need to progress to support
digital transformation and improve the digital maturity of the partnership. The strategy will focus on areas where structures are in place to support change, where focus
will be required and setting the stage for opportunities to move forward. As well as digital technologies, the strategy will focus on staff skills and digital inclusion within our
communities, and support digital change projects over the duration of the strategy. A draft version of the strategy is out for comment, and has been submitted to the
Senior Management Team, with a view to a final version being submitted to HSCP Board for approval on 25th June.  It is unlikely that the budget will be fully spent by
March 2024, however the budget will be required to be carried forward to next financial year to progress planned works
Mitigating Action
None available at this time as project spend will be dependent upon the digital strategy being approved by the HSCP Board
Anticipated Outcome
Upgrade and enhance digital systems within HSCP
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works Complete
Mitigating Action
None available at this time
Mitigating Action
Officers will continue to progress the project as quickly as possible but is complex and dependent on 3rd parties and equipment being compliant with the platform
Anticipated Outcome
Community Alarm Upgrade
Criminal Justice Adaptations
Renovation of Unit 11 Levenside Business Court.
Anticipated Outcome
Renovation of Unit 11 Levenside Business Court
Mitigating Action
None available at this time.
Anticipated Outcome
projects delivered on time.
Internet of Things Asset Tracking
Asset Tracking.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project Complete
Page 163

Page 164

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
1
Project Life Financials 24 6 23% 24 0 0%
Current Year Financials 2 2 119% 2 0 19%
Project Description
Project Manager Russell Hewton
Chief Officer Russell Hewton
Project Lifecycle 31-Mar-23 31-Mar-24
2
Project Life Financials 20 10 50% 20 0 0%
Current Year Financials 10 0 0% 10 (0) -1%
Project Description
Project Manager Karen Shannon
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-24 31-Mar-24
3
Project Life Financials 1,000 500 50% 1,000 0 0%
Current Year Financials 250 180 72% 250 0 0%
Project Description
Project Manager Adrian Gray
Chief Officer Laurence Slavin
Project Lifecycle 31-Mar-26 31-Mar-26
4
Project Life Financials 53 48 90% 53 0 0%
Current Year Financials 7 0 0% 7 0 0%
Project Description
Project Manager Alan Douglas
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
5
Project Life Financials 30 20 67% 30 0 0%
Current Year Financials 10 1 10% 10 0 0%
Project Description
Project Manager Pamela Clifford
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Anticipate full budget spend.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This goes into the overall Antonine Project budget - 5 Councils and Historic Environment Scotland - Expected spent by March 2024
Mitigating Action
No action required
Mitigating Action
None required at this time.
Anticipated Outcome
Solicitor support for Capital Projects, with full budget spend anticipated.
Re -imagine Antonine Wall  
Council's capital contribution towards the multi-partner (five local authorities and Historic Environment Scotland)
Rediscovering the Antonine Wall project which is also funded by the Heritage Lottery Fund.
Solicitor Project Support for Capital Projects
Solicitor costs to directly support capital projects
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Trainee solicitor in place. Budget will be fully spent.
Anticipated Outcome
Project will be delivered on time and on budget
Planned End Date Forecast End Date
Main Issues / Reason for Variance
No variances currently anticipated.
Mitigating Action
None required at this time.
Cost of Living
To support Council and community organisations with capital costs for cost of living initiatives.
Main Issues / Reason for Variance
The module is live
Mitigating Action
None required at this time.
Anticipated Outcome
Upgraded version with PCI compliant telephone payment system.
Payment Card Industry Data Security Standard (PCIDSS)
Module would ensure that WDC were compliant with the current requirements of PCIDSS for card payments without the
need for numerous costly workarounds
Planned End Date Forecast End Date
Requisition ICT Equipment.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Replacement of laptops, monitors and other ICT equipment. No further spend anticipated.
Mitigating Action
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment
None available at this time.
Anticipated Outcome
Requisition of ICT Equipment.
Page 164

Page 165

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment6
Project Life Financials 450 193 43% 193 (258) -57%
Current Year Financials 0 0 0% 0 0 0%
Project Description
Project Manager Rachel Moir
Chief Officer Alan Douglas
Project Lifecycle 31-Mar-24 31-Mar-24
7
Project Life Financials 421 421 100% 421 (0) 0%
Current Year Financials 116 0 0% 116 0 0%
Project Description
Project Manager David Main
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-25
8
Project Life Financials 912 912 100% 912 0 0%
Current Year Financials 6 0 0% 6 0 0%
Project Description
Project Manager Elaine Troup
Chief Officer Amanda Graham
Project Lifecycle 31-Mar-24 31-Mar-24
9
Project Life Financials 478 21 4% 478 0 0%
Current Year Financials 478 21 4% 478 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
10
Project Life Financials 221 221 100% 221 0 0%
Current Year Financials 8 7 87% 8 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 03-Apr-21 31-Mar-24
Main Issues / Reason for Variance
Project works complete.  Retentions to be paid.
Mitigating Action
None required at this time.
Anticipated Outcome
New all weather tennis courts.
Sports Facilities Upgrades - Argyll Park - Construction of 3 All Weather Tennis Courts
Project is part of wider investment in sporting facilities and is dependent on match funding from Sports Scotland. Agreement
in principle to wider WDC strategic priorities.
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Better access with parks, cemeteries and open spaces.
Public non-adopted paths and roads
Upgrades to drainage and lighting to enhance the lifespan of paths and roads within  facilities in public parks, cemeteries
and civic spaces.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Full budget committed
Main Issues / Reason for Variance
The budget will continue to support and contribute to building capacity in communities.
Mitigating Action
Project complete
Anticipated Outcome
Project complete
Invest in "Your Community Initiative"
Capital budget to support the roll out of Your Community,  an initiative designed to achieve coordinated service delivery in
response to community need. This is complimented by community capacity building, empowering WD citizens to do more
for their own communities (leading to less reliance on council).  Also included is the implementation of participatory
budgeting to support and build capacity in communities.
Planned End Date Forecast End Date
Mitigating Action
None required.
Anticipated Outcome
Projects delivered on budget
Transformation of Infrastructure Libraries and Museums
To improve performance and efficiency of Council's Libraries and Cultural Services.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Library colocations of Dalmuir and Balloch being fitted out by Asset Management.  Awaiting outcome for Duntocher and Parkhall libraries.  Remaining Libraries capital to
be spent in 24/25 once colocation plans completed.
Anticipated Outcome
Credit note received and project closed
Planned End Date Forecast End Date
Main Issues / Reason for Variance
This project has been completed. However a credit is outstanding and should be received this financial year.
Mitigating Action
Officers will continue to peruse the credit note
Zero Carbon
Zero Carbon
Page 165

Page 166

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment11
Project Life Financials 25 25 100% 25 0 0%
Current Year Financials 6 0 0% 6 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-24
12
Project Life Financials 485 485 100% 485 0 0%
Current Year Financials 430 430 100% 430 (0) 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
13
Project Life Financials 60 60 100% 60 0 0%
Current Year Financials 5 0 0% 5 0 0%
Project Description
Project Manager Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
14
Project Life Financials 237 201 84% 237 0 0%
Current Year Financials 237 201 84% 237 0 0%
Project Description
Project Manager Raymond Walsh/ Derek Barr
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
15
Project Life Financials 2,195 2,195 100% 2,195 (0) 0%
Current Year Financials 2,195 1,416 64% 2,195 (0) 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
Mitigating Action
None required at this time.
Anticipated Outcome
Intention is to complete various surfacing works by the end of March 2024.
Infrastructure - Roads
Infrastructure - Roads.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Roads Operations have completed an extensive surfacing program additional locations to be addressed in March measurement claims received have been processed. A
programme of structural patching is ongoing.
Main Issues / Reason for Variance
Ongoing works will be completed by 31/3/24.
Mitigating Action
None required at this time.
Anticipated Outcome
Project should be complete within budget.
Flood Risk Management
Enhancement of drainage infrastructure to ensure compliance with Flood Risk Management Act 2009.
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Traffic calming to be installed in Dumbarton East.
Turnberry Homes - traffic calming/ management at Turnberry housing development off Castle Road
Funding has been received from Turnberry Homes and will be used to introduce traffic calming and traffic management
measures to mitigate the impact of additional traffic accessing the housing development off Castle Road, Dumbarton.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Speed Humps to be installed March 2024
Main Issues / Reason for Variance
Projects identified with a number commenced.
Mitigating Action
None required at this time.
Anticipated Outcome
completion of project on time and on budget
Anticipated Outcome
Large bins provided for high traffic areas
Nature Restoration Fund
Nature resource for Faifley Community
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project complete.
Mitigating Action
None required at this time.
Large bins for high traffic areas (pilot)
Supply and install extra large litter bins as a pilot project within hotspot problem areas.
Page 166

Page 167

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment16
Project Life Financials 84 7 8% 84 0 0%
Current Year Financials 84 7 8% 84 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
17
Project Life Financials 80 80 100% 80 0 0%
Current Year Financials 75 9 12% 75 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
18
Project Life Financials 300 300 100% 300 0 0%
Current Year Financials 26 0 0% 26 0 0%
Project Description
Project Manager Raymond Walsh
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
19
Project Life Financials 1,000 1,000 100% 1,000 0 0%
Current Year Financials 878 616 70% 878 0 0%
Project Description
Project Manager Hugh Campbell
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-25 31-Mar-25
20
Project Life Financials 179 80 45% 179 0 0%
Current Year Financials 9 0 0% 9 (0) -4%
Project Description
Project Manager Gail MacFarlane
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-24
Main Issues / Reason for Variance
Complete
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within  budget.
Replacement of compactors at Dalmoak civic amenity site
The purchase of 2 compactors for the Council civic amenity site at Dalmoak.
Planned End Date Forecast End Date
Mitigating Action
None required.
Anticipated Outcome
Improvement to pavements.
Pavement improvements
Various pavement improvement projects.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Footway resurfacing works completed final invoices to be received & processed by 31/3/24
Main Issues / Reason for Variance
Upgrade of obsolete equipment will be completed by 31/3/24.
Mitigating Action
None required.
Anticipated Outcome
To upgrade traffic signals.
Anticipated Outcome
To purchase equipment.
Traffic Signal Upgrades
Upgrade Traffic Signals
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
New plant has been purchased.
Mitigating Action
None required.
Roads Plant
Purchase of Roads plant and equipment.
Anticipated Outcome
Intention is to complete works within budget.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Ongoing lighting works to be completed by 31/3/24.
Mitigating Action
None available at this time.
Street lighting and associated electrical infrastructure
WDC is responsible for the maintenance of 18,000 street lighting columns and associated illuminated signs and bollards. 
This budget is required for this infrastructure.
Page 167

Page 168

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment21
Project Life Financials 89 44 49% 89 0 0%
Current Year Financials 44 33 76% 44 0 0%
Project Description
Project Manager Gail MacFarlane
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-23 31-Mar-24
22
Project Life Financials 20 0 0% 20 0 0%
Current Year Financials 20 0 0% 20 0 0%
Project Description
Project Manager Gail MacFarlane
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
23
Project Life Financials 150 150 100% 150 0 0%
Current Year Financials 150 0 0% 150 0 0%
Project Description
Project Manager Gail MacFarlane
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-25
24
Project Life Financials 59 59 100% 59 0 0%
Current Year Financials 59 43 74% 50 (9) -15%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 31-Mar-24 31-Mar-24
25
Project Life Financials 200 200 100% 200 0 0%
Current Year Financials 200 150 75% 200 0 0%
Project Description
Project Manager Ian Bain
Chief Officer Gail MacFarlane
Project Lifecycle 30-Nov-23 30-Nov-23
Mitigating Action
None at this time
Anticipated Outcome
Steps at Dalmonach are more accessible.
Dalmonach Steps upgrade
Upgrading steps at Dalmonach to make them more accesible
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works progressing.
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within  budget.
Whitecrook Tennis Court Up-grade
Whitecrook Tennis Court Up-grade
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project Complete
Main Issues / Reason for Variance
MUGA due for commencement in February and environmental improvements complete
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within  budget.
Anticipated Outcome
Project delivered within  budget.
Park Improvements and Multi Games Area - Goldenhill Park
Park Improvements and Multi Games Area - Goldenhill Park
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Works complete awaiting final invoice
Mitigating Action
None Required.
Mitigating Action
None Required.
Anticipated Outcome
Project delivered within  budget.
River bank erosion repair - Levenhowe
River bank erosion repair in the Levenhowe area
ELECTRIC VEHICLE INFRASTRUCTURE
Electric Vehicle Infrastructure
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Project in progress.
Page 168

Page 169

WEST DUNBARTONSHIRE COUNCIL APPENDIX 8
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
PERIOD END DATE
PERIOD 10
Budget Forecast
Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Variance
Valuation Joint Board - Requisition of ICT Equipment26
Project Life Financials 892 290 32% 892 0 0%
Current Year Financials 892 290 32% 892 0 0%
Project Description
Project Manager James Gallacher
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-24 31-Mar-24
27
Project Life Financials 873 296 34% 873 0 0%
Current Year Financials 873 296 34% 873 0 0%
Project Description
Project Manager James Gallacher
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-24 31-Mar-24
28
Project Life Financials 983 503 51% 983 0 0%
Current Year Financials 185 53 29% 185 0 0%
Project Description
Project Manager James Gallacher
Chief Officer Victoria Rogers
Project Lifecycle 30-Sep-23 30-Sep-23
29
Project Life Financials 337 88 26% 337 0 0%
Current Year Financials 46 0 0% 46 0 0%
Project Description
Project Manager Arun Menon
Chief Officer Victoria Rogers
Project Lifecycle 31-Mar-30 31-Mar-30
30
Project Life Financials 1,586 130 8% 1,586 0 0%
Current Year Financials 1,586 130 8% 1,586 0 0%
Project Description
Project Manager N/A
Chief Officer N/A
Project Lifecycle 31-Mar-24 31-Mar-24
Anticipated Outcome
Direct project support costs allocated as appropriate.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Salary Capitalisation in 2023/2024.
Mitigating Action
None required.
Mitigating Action
none required
Anticipated Outcome
Work continues on developments resulting in some spend in the current year.
Direct Project Support
Business support cost such as reallocation of architects and project support at year end.
Development of Workforce Management System
Project to develop the Workforce Management System.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Work continues on developments resulting in some spend in the current year.
Main Issues / Reason for Variance
Delay to Sharepoint implementation project. External resourcing requirements less than expected and small underspend being carried to next year.
Mitigating Action
none required
Anticipated Outcome
projects delivered on time and on budget
Anticipated Outcome
projects delivered on time and on budget
365 Implementation
Project services to delivery Microsoft 365 Implementation including 3rd party supplier, training, technical consultancy etc.
Planned End Date Forecast End Date
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Various projects in progress and orders raised for Cyber Security technology, Citrix replacement devices, SAN storage, server hardware, system security remediation and
upgrades,  Anticipate full budget spend subject to delivery timescales.
Mitigating Action
none required
ICT Security & DR
The project is for the enhancement of security systems, server replacement and the update of corporate applications to
ensure compliance with 15/16 PSN requirements, to enhance the disaster recovery capabilities of WDC.
Main Issues / Reason for Variance
Device replacement project in progress and orders raised totally £480k awaiting delivery.
Mitigating Action
none required
Anticipated Outcome
projects delivered on time and on budget
ICT Modernisation
This budget is to facilitate ICT infrastructure and modernise working practices.
Planned End Date Forecast End Date
Page 169

Page 170

WEST DUNBARTONSHIRE COUNCIL APPENDIX 9
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (2,907) (257) 9% (2,907) (0) 0%
Current Year Financials (2,070) 0 0% (257) 1,813 -88%
Project Description
Project Lifecycle 31-Mar-24 31-Mar-24
2
Project Life Financials (92,560) (41,875) 45% (93,795) (1,236) 1%
Current Year Financials (7,453) (12,495) 168% (7,453) 0 0%
Project Description
Project Lifecycle 31-Mar-30 31-Mar-30
3
Project Life Financials (38,805) (4,179) 11% (41,085) (2,280) 6%
Current Year Financials (16,027) (6,349) 40% 326 16,353 -102%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
4
Project Life Financials (7,793) (5,179) 66% (7,793) 0 0%
Current Year Financials (3,517) (239) 7% (2,409) 1,108 -31%
Project Description
Project Lifecycle 31-Mar-24 31-Mar-24
31 January 2024
Budget Details
Project Life Financials
Application of resources is dependent on capital project progressing in year as planned.
Spend to Date Forecast Variance
Resources Carried Forward
These are resources that have been received in previous years relating to Turnberry Homes, Town Centre Fund
Grant, Digital Inclusion, Clydebank Can on the Canal, Internet of Things Asset Tracking, Renew Playparks,
Knowes Nature Reserve, Flood Prevention, District Heating Electric Vehicle Infrastructure and Auld Street Bond.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Planned End Date Forecast End Date
Mitigating Action
None required at this time.
Anticipated Outcome
Application of resources held on balance sheet as at 31 March 2023 as appropriate.
General Services Capital Grant
This is a general grant received from the Scottish Government in relation to General Services capital spend
Application of resources is dependent on capital project progressing in year as planned.
Main Issues / Reason for Variance
General services capital grant is anticipated to be received as forecast.
Mitigating Action
None required at this time
Anticipated Outcome
General services capital grant is anticipated to be received as forecast.
Ring Fenced Government Grant Funding
This is ring fenced grant funding which is primarily anticipated to be received from the Scottish Government and
relates to Cycling, Walking, Safer Streets, Regeneration Placed Based Investment Programme, Early Years,
Gruggies Burn Flood works, Early Years funding, City Deal and Town Centre Fund.
Planned End Date Forecast End Date
Main Issues / Reason for Variance
None required.
Mitigating Action
Mitigating actions are detailed within the appropriate status updates.
Anticipated Outcome
Application of resources as appropriate.
Match Funding / Other Grants and Contributions
Match Funding / Other Grants and Contributions
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Application of resources is dependent on capital project progressing in year as planned.
Mitigating Action
Anticipated Outcome
Match funding received.
Page 170

Page 171

WEST DUNBARTONSHIRE COUNCIL APPENDIX 9
GENERAL SERVICES CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
PERIOD END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details
Project Life Financials
Spend to Date Forecast Variance
Resources Carried Forward
5
Project Life Financials (91,299) (38,764) 42% (94,398) (3,099) 3%
Current Year Financials (63,135) 3,119 -5% (23,010) 40,124 -64%
Project Description
Project Lifecycle 31-Mar-26 31-Mar-26
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved for the purposes of
funding capital expenditure
Planned End Date Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery therefore mitigating action is detailed in the red and amber analysis.
Mitigating Action
None available at this time.
Anticipated Outcome
While prudential borrowing requirement is likely to be less than budgeted in the current financial year this is anticipated to catch up over the
programme life.
Page 171

Page 172

Page 172

Page 173

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Resources
Council - 27 March 2024
___________________________________________________________________
Subject: Housing Revenue Account (HRA) Budgetary Control Report
to 31 January 2024 (Period 10)
1. Purpose
1.1 The purpose of the report is to provide members with an update on the
financial performance to 31 January 2024 (Period 10) for the HRA revenue
budget and the HRA capital budget.
2. Recommendations
2.1 Members are asked to:
i) note the HRA revenue account is forecasting an adverse variance of
£3.863m. The adverse variance will be offset by removing the £1.729m
budgeted contribution from revenue to capital (CFCR) and using
£2.134m of the HRA reserves.
ii) note that the use of HRA reserves to address the projected adverse
variance will lead to a closing HRA reserves balance of £0.500m which
is below the prudential target.
iii) note that work will continue to identify efficiencies across all areas of the
housing budget to allow HRA reserves to replenished and maintained in
line with the prudential target, while ensuring that services are still
delivered and that there is not a corresponding reduction in service
provision.
iv) note the HRA capital budget is forecasting an in-year underspend of
£69.166m which comprises £4.912m for projects that will be re-profiled
into 2024/25 and projects with a net underspend of £64.253m this year,
as detailed in Appendix 4.
3. Background
Revenue
3.1 The council approved a £49.643m HRA revenue budget for 2023.24 on the 1st
of March 2023
ITEM 12
Page 173

Page 174

Capital
3.2 The council approved the updated HRA capital plan for 2023/24 on the 1st of
March 2023. The capital plan has been augmented by the re-profiling of
underspends and budget with a revised HRA capital monitoring budget for
2023/24 of £124.846m.
4. Main Issues
Revenue
4.1 The budgetary position for HRA revenue account is provided in Appendix 1
with information on projected variances valued at more than £0.050m being
provided as Appendix 2.
4.2 Previous reports to Council have highlighted the significant HRA cost
pressures in 2023/24. The HRA has seen a significant impact on its finances
because of range of external factors beyond its control, including the rising
cost of local authority borrowing, demand led pressures across the repairs
and void service, high inflation, and uncertainty and volatility surrounding
energy costs, particularly the spiralling cost of electricity. 
4.3 Previous Budgetary Control Reports have highlighted to members the severe
pressure across HRA loan charge and HRA repair and void budgets.
Members will be aware that local authority borrowing costs have increased
considerably over the past 12-18 months leading to much higher interest
payments on new borrowing and debt refinancing. The forecast is for higher
interest rates to lead to HRA debt interest payments being £2.912m more than
budget this year. HRA repair and void expenditure has been adversely
impacted by a combination of an increased volume of jobs raised as the
service has addressed COVID backlogs across the repair and void service
and by current economic conditions, where labour, materials and sub-
contractor costs have all increased significantly. The revenue impact on HRA
repair and void budgets this year is forecast at £2.675m. Furthermore, the
backlog of voids and repairs has led to a sharp increase in rent abatement
payments to tenants to compensate for disruption and inconvenience, the
forecast is for abatement payments to be £0.316m more than budget this
year. These acute cost pressures should ease as interest rates and inflation
falls and the repairs service catches up with backlogs.
4.4 The current economic operating environment is also placing financial stress
on the HRA in terms of increasing utility and insurance costs. Electricity costs
for landlord supplies have increased by more than 60% in 2023/24 leading to
an in-year cost pressure of £0.248m. Insurance premiums are also affected by
inflation as well as risk and it is forecast that higher insurance premiums will
lead to an in-year cost pressure of £0.130m.
Page 174

Page 175

4.5 Whist officers have taken steps in year to mitigate cost pressures through the
active management of repair and CFCR budgets, based on the information
available at this time, it is projected that the HRA will have a deficit of £3.863m
this financial year. The deficit will be offset by removing the £1.729m
budgeted contribution from revenue to capital (CFCR) and using £2.134m of
HRA reserves.
4.6 The current forecast is for a closing HRA reserves balance of circa £0.500m
on 31 March 2024. In terms of adequacy of reserves, the forecast closing
HRA reserves balance is insufficient to deal with future financial shocks to the
HRA budget. As a result of these externally driven financial challenges,
officers will continue to focus on reducing service delivery cost across the
housing budget to replenish and maintain reserves in line with the prudential
target, while ensuring that services are still delivered and that there is not a
corresponding reduction in service provision.   
Capital
4.7 The HRA capital summary position is shown in Appendix 3. Information on
projects that are highlighted as being within the red category is provided in
Appendix 4 and Appendix 5 provides information on the projects at Green. A
summary of anticipated resources is shown in Appendix 6. The analysis
shows that there is currently a projected in-year underspend of £69.166m
(55.4%) as detailed below. 
2023/24
Forecast
£m
2023/24
Budget
(£m
Variance
£m
Other Capital Expenditure 4.528 4.240 0.288
Major Component Replacement 17.902 21.813 (-3.911)
Void Capital 6.735 3.000 3.735
Contingencies 0.000 0.100 (-0.100)
Structural & Environmental 2.162 3.420 (-1.258)
Support Costs 2.629 2.629 -
Buy Back Programme 4.500 4.435 0.065
Affordable Supply Programme 17.224 85.209 (-67.985)
Total 55.680 124.846 (-69.166) 
4.8 The main cost pressures / overspends are across the budgets to deal with
large and complex repair and void works and environmental works. The
demand for and cost of these works has been incredibly high this year,
mirroring the pressure being experienced in the corresponding revenue
budgets. The capital budget has had to fund many high-cost complex works
this year as the service addressed void and repair backlogs. Void numbers
and repair backlogs have reduced significantly and going forward the capital
spend is expected to reduce considerably. 
Page 175

Page 176

4.9 From the analysis within the appendices the main projects that are expected
to require re- profiling into 2024/25 are:
Project Name Re-profiling 
£m
EESH compliance work 1.746
Environmental Sensors 1.500
Multi-Storey Flat Strategy 1.200
Better Homes Priority Budget 0.375
Housing CCTV Installation Programme 0.250
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report.
7. Risk Analysis
7.1 The main financial risks to the ongoing financial position relate to the
identification of unforeseen cost between now and the end of the financial
year. This can affect all service areas.
8. Equalities Impact Assessment (EIA)
8.1 The report is for noting and therefore there is no Equalities Impact Assessment
for this report.
9. Consultation
9.1 Housing management and Legal services have advised there are neither any
issues nor concern with the report.
10. Strategic Assessment
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.
Laurence Slavin
Chief Officer – Resources
Date: 22 February 2024
___________________________________________________________________
Page 176

Page 177

Person to Contact: Jim McCarron - Business Unit Finance Partner
16 Church Street, Dumbarton, G82 1QL,
e-mail james.mccarron@west-dunbarton.gov.uk
Appendices: Appendix 1 - Budgetary Position (Revenue)
Appendix 2 - Variance analysis (Revenue) 
Appendix 3 - Budgetary Position (Capital)
Appendix 4 - Variance analysis Red (Capital)
Appendix 5 - Variance analysis Green Projects (Capital)
Appendix 6 - Resources (Capital)
Appendix 7 - Analysis of Affordable Housing Supply 
Programme (Capital)
Background Papers: None
Wards Affected: All
Page 177

Page 178

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2023/24
PERIOD END DATE
Subjective Summary
Total Budget
2023/24            
£000
Spend to Date
2023/24 
£000
Forecast
2023/24
£000
Annual
RAG
Status
Employee Costs 7,669 5,479 7,986 317 4% 
Property Costs 2,377 1,721 2,608 231 10% 
Transport Costs 142 95 142 0 0% 
Supplies, Services And Admin 389 262 398 9 2% 
Support Services 2,720 2,234 2,681 (39) -1% 
Other Expenditure 534 676 806 272 51% 
Repairs & Maintenance 16,257 11,662 16,068 (189) -1% 
Bad Debt Provision 1,089 87 959 (130) -12% 
Void Loss (Council Tax/Lost Rents) 1,261 1,284 1,500 239 19% 
Loan Charges 15,476 15,691 18,829 3,353 22% 
CFCR 1,729 0 0 (1,729) -100% 
Total Expenditure 49,643 39,191 51,977 2,334 5% 
House Rents (47,728) (39,276) (47,750) (22) 0% 
Lockup Rents (217) (168) (202) 15 -7% 
Factoring/Insurance Charges (1,434) (1,498) (1,494) (60) 4% 
Other rents (117) (87) (120) (3) 3% 
Interest on Revenue Balance (30) (122) (146) (116) 387% 
Miscellaneous income (117) (42) (131) (14) 12% 
Transfer from / to Reserves 0 0 (2,134) (2,134) 0% 
Total Income (49,643) (41,194) (51,977) (2,334) 5% 
Net Expenditure 0 (2,002) 0 0 
31 January 2024
Forecast Variance 2023/24        
£000               %
Page 178

Page 179

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 January 2024
PERIOD 10
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Employee Costs 7,669 7,986 317 4% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Property Costs 2,377 2,608 231 10% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Other Expenditure 534 676 272 51% 
Main Issues
Mitigating Action
Anticipated Outcome
This budget covers rent abatements, payments to the Womens Aid service, legal expenses and other sundry costs.
Variance Narrative
The overspend is due to higher rent abatement payments this year due to
challenges in Building Services addressing the backlog of voids and repairs
alongside complex meter related issues preventing tenants being able to
return to their homes. The abatement overspend is partly offset by
underspends in legal and banking costs.
Work is underway with Housing Operations and Building Service to review
existing processes and enhance staff guidance, alongside improved
monitoring reports to reduce the abatement spend going forward.  Help to
move and support workers continuing to support work to resolve meter
related issues.
A year end overspend.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Subjective Description
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Subjective Description
Subjective Analysis forecast
Variance
Subjective Description
This budget covers electricity, gas, rates, rents, cleaning  and insurance costs.
Variance Narrative
This budget covers all employees charged directly to the HRA including caretakers.
Variance Narrative
The employee cost overspend reflects the impact of the 2023/24 local
government pay award that was greater than the budgeted pay increase.
Managers continue to consider ways to keep staffing costs down including
considering each vacancy as it arises and the  need / urgency to fill.
A year end overspend.
Budget Details Variance Analysis
Property costs overspend mainly due to increased electricity costs advised
through the electricity national framework agreement after the budget was
set. In addition, insurance costs are forecast to be exceed budget reflecting
the high rate of inflation and cost pressures across the insurance market.
A year end overspend.
Managers are reviewing electricity usage to identify action that can be taken
to reduce energy consumption and cost.
Page 179

Page 180

HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 January 2024
PERIOD 10
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Repairs & Maintenance 16,257 16,068 (189) -1% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Bad Debt Provision 1,089 959 (130) -12% 
Main Issues
Mitigating Action No mitigating action is required.
Anticipated Outcome
Variance Narrative
A higher volume of repair orders, partly due to the clearance of a COVID
related  backlog, and inflationary pressures with  pay and construction
materials has driven up both in-house repairs team ( Building Services)  and
external contractor costs. These costs pressures have led to overspends on
responsive repair and void repair budgets. These overspends have been
offset by an underspend against the electrical installation inspection reports (
EICR) budget where some of the planned programme has slipped into the
next financial year, an underspend against the WDTRO budget and by
additional rechargeable repair income.
Tight controls are in place to minimise external contractor spend across
repair and void work categories. Building Services continues to implement its
improvement programme with its  focus on the smart use of technology to
improve logistics and support  productivity improvement and a continued
focus on improved attendance and improved productivity to reduce cost.
A year end underspend.
Budget Details Variance Analysis
The bad debt provision is forecast to  less than estimate. This is  based on
the current year provision being at a similar level to 2022/23.
A year end underspend.
Subjective Analysis forecast
Variance
Service Description
This budget allows for the provision for bad and doubtful debts to be maintained at an appropriate level
Variance Narrative
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Service Description
This budget covers all repair and maintenance expenditure to houses and lockups
Page 180

Page 181

HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 January 2024
PERIOD 10
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Void Loss (Council Tax/Lost Rents) 1,261 1,500 239 19% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Loan Charges 15,476 18,829 3,353 22% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
CFCR 1,729 0 (1,729) -100% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
A year end overspend.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Service Description
This budget covers the rents lost on void houses and lockups and the cost of council tax on void properties.
Variance Narrative
The adverse variance relates to void numbers being higher than expected at
time of budget setting.  The increased void numbers have an adverse impact
on void rent loss and void house council tax payments. Void turnaround times
were longer than anticipated as result of the high number of voids at the start
of the financial year. We also continue to experience challenges with utility
companies  resolving debt on meters and meter reconnections which
adversely impacts on the length of time properties are void. There is an
improving trend with voids, with void numbers reducing considerably during
the year.
A void working group continues to meet to identify and address issues and
senior Housing Operations  and Building services staff continue to work well
in partnership to improve the speed and throughput of void house repairs.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Service Description
Service Description
Loan Charges is made up of the repayments of principal sums and the payment of interest and expenses
Variance Narrative
The adverse variance is the due to loan interest payments being higher than
anticipated at time of budget setting. Local authority borrowing costs have
increased considerably over the last 12 - 18 months and this has driven up
our debt financing costs.
The Council continues to actively manage its external / internal borrowing to
ensure that borrowing costs are minimised.
A year end overspend.
This budget covers the contribution from revenue to capital
Variance Narrative
The cost pressures across the HRA revenue budget means that there is no
scope to make a revenue contribution to capital spend in 2023/24.
None available
A year end underspend.
Page 181

Page 182

HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 January 2024
PERIOD 10
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Factoring/Insurance Charges (1,434) (1,494) (60) 4% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Interest on Revenue Balance (30) (146) (116) 387% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget Forecast
Spend
RAG
Status
£000 £000 £000 %
Transfer from / to Reserves 0 (2,134) (2,134) 0% 
Main Issues
Mitigating Action
Anticipated Outcome
Service Description
Interest receivable on HRA balances
Variance Narrative
The favourable variance issue to the recent increase in interest rates. This
will  result in higher interest earned on cash balances.
A year end income over-recovery.
Service Description
Income received from insurance and factoring
Variance Narrative
The increased income reflects a 10% increase in fees in 2023/24 in line with
the council's sales fees charges increase approved in March 2023. The
budget only assumed a 4% increase
None required
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
A year end income over-recovery.
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Transfer of year end under/overspend to HRA reserves.
Variance Narrative
The recent sharp increase in local government borrowing costs and the 
inflationary pressures across budgets mean that it is now necessary to
drawdown £2.134m from HRA reserves to deliver a break even position.  The
current reserve balance is £2.634M. The drawdown will  reduce HRA
reserves to circa £0.500M at March 24 which is below the 2023/24 prudential 
target of £0.984M.
Management will look to identify and deliver general efficiencies across all
areas of the housing budget in the remainder of financial year 23/24 and in
financial year 24/25 to allow reserves to be replenished in line with the
prudential target.
Reduction in HRA reserves at 31 March 2024
Budget Details Variance Analysis
Subjective Analysis forecast
Variance
Service Description
Page 182

Page 183

APPENDIX 3
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
OVERALL PROGRAMME SUMMARY
MONTH END DATE
PERIOD 10
Spend to
Date Spend to Date
£000 £000
Red
22 71.0% 29,153 66.9% 22 71.0% 29,153 66.9%
Green
9 29.0% 14,420 33.1% 9 29.0% 14,420 33.1%
31 100% 43,573 100% 31 100% 43,573 100%
Budget Spend to
Date
Forecast
Spend Forecast Variance Budget Spend to Date Forecast
Spend
Forecast
Variance Reprofiled Over/
(Under)
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
262,722 29,153 201,020 (61,702) 102,743 29,153 36,404 (66,339) (5,185) (61,154)
104,007 14,420 100,583 (3,423) 22,103 14,420 19,276 (2,827) 272 (3,099)
366,729 43,573 301,603 (65,125) 124,846 43,573 55,680 (69,166) (4,912) (64,253)
366,729 43,573 301,603 65,125 124,846 43,573 55,680 69,166
0 0 0 0 0 0 0 0
TOTAL RESOURCES
NET EXPENDITURE
Projects are forecast to be overspent and/or significant delay to
completion
Green
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
TOTAL EXPENDITURE
Project Status Analysis
Project Life Financials Current Year Financials
Red
Projects are on target both in relation to overall budget and the forecast
stages in the project life cycle and no issues are anticipated at this time
31 January 2024
Project Status Analysis
Project Life Status Analysis Current Year Project Status Analysis
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project Spend at
RAG Status
Number of
Projects at
RAG Status
% Projects at
RAG Status
% Project
Spend at RAG
Status
Red
Projects are forecast to be overspent and/or experience material delay
to completion
Green
Page 183

Page 184

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 2,814 2,509 89% 5,489 2,675 95%
Current Year Financials 525 2,509 478% 3,200 2,675 510%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
2
Project Life Financials 1,493 56 4% 1,493 0 0%
Current Year Financials 529 56 11% 154 (375) -71%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
3
Project Life Financials 10,000 0 0% 10,000 0 0%
Current Year Financials 2,000 0 0% 500 (1,500) -75%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
4
Project Life Financials 750 0 0% 750 0 0%
Current Year Financials 250 0 0% 0 (250) -100%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-25
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
Capitalised minor works
This is a budget to undertake specific minor ad hoc capital projects that arise on demand throughout the
financial year. 
Planned End Date  Forecast End Date
Better Homes Priority Budget
Priority projects as prioritised by the Better Homes Group 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
A number of priority initiatives, supported by the Better Homes Project Board,  are being investigated and are envisaged to have a positive
impact on the current council housing stock and budget.  Due to time taken to progress projects, it is likely there will be some reprofiling to
24/25.
Main Issues / Reason for Variance
Budget is expected to overspend due to costs and demand for budget being higher than anticipated at time of budget setting.
Mitigating Action
Officers in discussion to identify possible mitigation
Anticipated Outcome
Project to complete over budget
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Environmental Sensors Programme 
Environmental sensors programme, funded by enhanced housing investment programme. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Project introduced as part of the enhanced capital programme, with aim to install an environmental sensor in every Council owned property. 
Installation of sensors has commenced, albeit later than originally anticipated.  Remaining current year budget to be rephased to 24/25 for
continuation of project.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Housing CCTV Installation Programme
CCTV Installation Programme, funded by enhanced housing investment programme 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works to progress as part of enhanced capital programme for 23/24 and to be led by Council CCTV team.  Due to survey and planning
time, works are commencing later than anticipated, with unspent budget required to be rephased to 24/25 for project progression.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Page 184

Page 185

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 203 0 0% 103 (100) -49%
Current Year Financials 116 0 0% 16 (100) -86%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
6
Project Life Financials 209 0 0% 174 (34) -16%
Current Year Financials 71 0 1% 37 (34) -48%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
7
Project Life Financials 17 0 0% 17 0 0%
Current Year Financials 17 0 0% 0 (17) -100%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
8
Project Life Financials 36 36 99% 36 (0) -1%
Current Year Financials 36 36 99% 36 (0) -1%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Planned End Date  Forecast End Date
Main Issues / Reason for Variance 
Development of QL system to carry on through 24/25.  Salaries of staff directly involved with development of system to be coded to direct
project support.
Mitigating Action
None required
QL Development
This budget relates to the costs associated with the development of the Integrated Housing Management
System
Main Issues / Reason for Variance
Programme being progressed with work budget required to be rephased to 24/25.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Full budget spend
Gypsy Travellers Site
Gypsy/ Traveller Site improvements 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Redployable CCTV Cameras
Purchase of 5 redeployable CCTV cameras for Housing use
Community Safety Projects
Community Safety Projects 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Budget required to be rephased to 24/25
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works for this project complete in April 23/24.
Mitigating Action
None required
Page 185

Page 186

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
9
Project Life Financials 96 0 0% 96 0 0%
Current Year Financials 96 0 0% 0 (96) -100%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
10
Project Life Financials 32,986 3,748 11% 32,986 0 0%
Current Year Financials 6,146 3,748 61% 4,400 (1,746) -28%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
11
Project Life Financials 242 77 32% 277 35 14%
Current Year Financials 45 77 170% 80 35 77%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Airport Noise
Noise Insulation Project 
Planned End Date  Forecast End Date
Targeted SHQS /EESSH compliance works
This budget is to focus on work required to maintain the SHQS compliance and energy efficiency  with
WDC housing stock.   
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works progressing well, however some rephasing may be required to 24/25.
Main Issues / Reason for Variance
West Dunbartonshire Council are no longer eligible for match funding from Glasgow Airport Association, following assessment of properties
within West Dunbartonshire.  West Dunbartonshire is not deemed to have any commercial or residential properties that fall within the scope
of the scheme to be eligible for match funding, and budget therefore has been reduced from £0.192m to £0.096m.  The remaining budget
will be used to develop a programme of works following engagement with an aircraft noise consultant, who will work with Officers to make
adaptations to previously identified properties.  The budget will be reprofiled as required.
Mitigating Action
None required
Anticipated Outcome
Full budget spend in future year
Mitigating Action
None available at this time
Anticipated Outcome
Full budget spend over project life
External stores/garages/bin stores/drainage component renewals
This budget is to focus on external stores/garages/bin stores etc. component renewals as identified and
recommended from the housing stock condition survey.
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Demand for budget higher than anticipated at time of budget setting, with overspend expected to occur in 23/24.
Mitigating Action
None required
Page 186

Page 187

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
12
Project Life Financials 242 12 5% 219 (23) -10%
Current Year Financials 45 12 28% 22 (23) -51%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
13
Project Life Financials 606 39 6% 543 (63) -10%
Current Year Financials 113 39 35% 50 (63) -56%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
14
Project Life Financials 9,872 1,701 17% 10,232 360 4%
Current Year Financials 1,840 1,701 92% 2,200 360 20%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
15
Project Life Financials 303 3 1% 257 (47) -15%
Current Year Financials 57 3 6% 10 (47) -82%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Secure entry component renewals
This budget is to focus on secure door entry component renewals as identified and recommended from
the housing stock condition survey and appropriate council officer referrals. 
Planned End Date  Forecast End Date
Statutory/regulatory compliance works (lifts/electrical/legionnella/fire etc)
This budget will be used to upgrade / replace components / installations in order to comply with the
relevant standards / legislation / health and safety in relation to housing stock. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
23/24 demand for budget less than anticipated at time of budget setting.  Current year underspend to be carried forward to future years.
Main Issues / Reason for Variance
This programme always presents challenges with owner liaison and reaching agreements to install door entry where none exists, this
contributes directly to achieving SHQS compliance for this element.  Any underspend in current year will be carried forward to future years.
Mitigating Action
Officers continue to liaise with owners to encourage agreement for install.
Anticipated Outcome
It is likely that this will not to meet full spend in the current year despite best efforts but officers will endeavour to gain owners agreement.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Demand has exceeded expectations.  Due to the nature of this project (ensuring heating and hot water availbility) there is no option for a
conscious reduction of installs.
Mitigating Action
Whilst demand is leading spend, officers will work to minimise any budget overspend.
Mitigating Action
None required
Anticipated Outcome
Works complete as required
Heating improvement works
Carry out works to renew inefficient boilers/full systems as identified from the stock condition survey and
renewal of obsolete/damaged boilers. 
Main Issues / Reason for Variance
23/24 demand for budget less than anticipated at time of budget setting.  Current year underspend to be carried forward to future years.
Mitigating Action
None required
Anticipated Outcome
Works complete as required
Anticipated Outcome
Full budget spend, likely overspend.
Energy improvements/energy efficiency works
Energy improvements/ efficiency works (e.g. loft insulation, pipe/tank insulation, draught exclusion) 
Planned End Date  Forecast End Date
Page 187

Page 188

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
16
Project Life Financials 103 0 0% 0 (103) -100%
Current Year Financials 103 0 0% 0 (103) -100%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
17
Project Life Financials 13,900 5,636 41% 17,635 3,735 27%
Current Year Financials 3,000 5,636 188% 6,735 3,735 125%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
18
Project Life Financials 5,454 1,141 21% 5,454 0 0%
Current Year Financials 1,017 1,141 112% 1,540 523 51%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
19
Project Life Financials 1,212 59 5% 1,086 (126) -10%
Current Year Financials 226 59 26% 100 (126) -56%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Improvement works (Risk St)
Risk Street Over clad
Anticipated Outcome
Full budget spend
Void house strategy programme
Spend on Void Properties to bring them up to letting standard 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Budget required to be rephased to 24/25
Mitigating Action
None required
Main Issues / Reason for Variance
Void works to continue into 23/24 to bring void properties up to a lettable standard.  Based on current projections using updated anticipated
numbers it looks likely that the budget will be insufficient , resulting in a projected overspend in 23/24. 
Mitigating Action
This is a significant priority and we continue to make positive progress against internal plan and targets to reduce the number of void
houses.  We expect this to continue to reduce.
Anticipated Outcome
The cost of bringing void properties up to lettable standard will result in a overspend.
Main Issues / Reason for Variance
Work progressing well and ahead of spend targets, at this pace likely to exceed budget to meet tenant demand. Officers currenty working to
manage workload and prioritise to minimise overspend.
Mitigating Action
Officers currenty working to manage workload and prioritise to minimise overspend.
Anticipated Outcome
Full budget spend, likley to overspend.
Environmental renewal works, paths/fences/walls/parking area's
Environmental renewal works, paths/fences/walls/parking areas 
Planned End Date  Forecast End Date
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Asbestos management works
This budget is to fund work associated with the management of current asbestos legislation and the 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Budget to rephased to 24/25 for continuation of works.
Page 188

Page 189

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
20
Project Life Financials 5,050 33 1% 5,050 0 0%
Current Year Financials 1,300 33 3% 100 (1,200) -92%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Multi Story Flats  ( including Fire Risk Assessment Works)
High Rise Fire Safety Measures
Anticipated Outcome
Full budget spend
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works taking longer to progress than anticipated.  Budget required to be rephased to 24/25.
Mitigating Action
None required
Page 189

Page 190

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
21
Project Life Financials 177,132 14,013 8% 109,020 (68,112) -38%
Current Year Financials 85,209 14,013 16% 17,122 (68,087) -80%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Variance to
23/24 Budget
Site/ Spend £000  Overspend   Underspend  Reprofiling
Haldane Primary School 77 77
Clydebank East (14,340) (14,340)
Queens Quay Site B (410) (410)
Queens Quay Site C (9,422) (9,422)
Pappert (9,993) (9,993)
Bank Street (3,575) (3,575)
Clydebank Health Centre (4,701) (4,701)
Willox Park Phase1 (5,409) (5,409)
Mount Pleasant (8,527) (8,527)
Silverton (2,563) (2,563)
Gap sites (5,794) (5,794)
Fees, Staffing Costs,
contingency (3,429) (3,429)
TOTAL OF ALL PROJECTS (68,087) 77 0 (68,164)
Variance Category 
Forecast End Date
Main Issues / Reason for Variance
The £68.087m variance is made up of £0.077m overspend, and reprofiling of £68.164m into 2024/25 onwards . Summary of reprofiled sites
together with site specific updates as follows:-
Affordable Supply Programme
Affordable Housing Supply Programme 
Planned End Date
Page 190

Page 191

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
HRA CAPITAL PROGRAMME
ANALYSIS OF RED PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
22
Project Life Financials 0 88 #DIV/0! 102 102 #DIV/0!
Current Year Financials 0 88 #DIV/0! 102 102 #DIV/0!
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
TOTAL OF RED PROJECTS
Project Life Financials 262,722 29,153 11% 201,020 (61,702) -23%
Current Year Financials 102,743 29,153 28% 36,404 (66,339) -65%
Haldane - Site complete, retention paid in 2023/24
Clydebank Health Centre - Demolitions planned for 2023/24, Design and Build development and contractors will be procured also  this year,
however physical site start will not be achieved until 2024/25.
Mount Pleasant -19 units to be completed on site by March 2025.  Demolition now complete and contractor award appointment made in
September.  £0.250m estimated to be spent this financial year with remaining current year budget to be reprofiled to 2024/25 for site start in
March 2024.
Bonhill Gap Site - Spend reprofiled from 2023/24 to 2024/25 as design team procurement was delayed.  Projected spend in 2023/24 will be
design and statutory fees.
Mitigating Action
Staff will work closely with all stakeholders to try and ensure timely resolutions of issues as they arise.
Anticipated Outcome
Project will still complete and will meet revised spend profiles .
Clydebank East - 88 units to be completed by March 2025.  Project delivery reprofiled due to extensive groundworks. Project on site and
programme adhering to amended delivery plan.
Queens Quay Site B - 29 units completed on site in 2022/23.  Project completed, retention figure included and associated costs in terms
with road construction.
Queens Quay Site C - 20 units to be completed on site, however no further progress due to land owner issue.  At the time it is assumed
approximately £2m will be spent on land purchase, but this will be reviewed in early 2024, with the remaining current year budget to be
reprofiled to 2024/25.
Pappert - 26 units to be completed on site by April 2025.  Planning delay negated anticipated spend profile for 2023/24, however Planning
approval received 20 September 2023 and site start in early 2024 planned.
Bank Street - 22 units to be completed on site.  Spend reprofiled from 2023/24 to 2024/25 as design team procurement was delayed. 
Projected spend in 2023/24 will be design and statutory fees.
Willox Park Phase1 - 17 units to be completed on site.   Spend reprofiled from 2023/24 to 2024/25 as design team procurement was
delayed.  Projected spend in 2023/24 will be design and statutory fees.
Demoliton related costs incurred as required
Demolitions
Costs associated with demolition of surplus stock 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Costs associated with demolition of old lock ups and stock surplus to requirements
Mitigating Action
None required
Anticipated Outcome
Page 191

Page 192

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials 3,216 478 15% 3,201 (15) 0%
Current Year Financials 600 478 80% 585 (15) -3%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
2
Project Life Financials 19,286 2,769 14% 16,757 (2,529) -13%
Current Year Financials 5,679 2,769 49% 3,150 (2,529) -45%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
3
Project Life Financials 17,937 3,574 20% 17,937 0 0%
Current Year Financials 4,547 3,574 79% 4,580 33 1%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
4
Project Life Financials 6,400 0 0% 6,400 0 0%
Current Year Financials 0 0 #DIV/0! 0 0 #DIV/0!
Project Description
Project Lifecycle 31-Mar-27 31-Mar-27
Main Issues / Reason for Variance
Works expected to commence next financial year, therefore no Issues to report at this time.  Project anticipated to meet full spend
and targets.
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Anticipated Outcome
Full budget spend
District Heating 
District Heating Connection to the Dalmuir and Littleholm multi storey flats 
Planned End Date  Forecast End Date 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Project is progressing well in 23/24, with 23/24 costs expected to be near current year budget.
Mitigating Action
None required at this time
Mitigating Action
None required
Anticipated Outcome
Scheduled works to complete under current year budget.
Doors/window component renewals
Doors/Windows Component Renewals
Roof Coverings
Building external component renewals, roofs/chimneys/flashings/fascias/gutters/svp 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works expected to meet revised timescales which will be less than current year budget and therefore project will report an in year
underspend.
None required
Anticipated Outcome
Full budget spend
Adaptations to Housing for Special Needs 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works progressing, small amount of reprofiling to 24/25 is possible.
Mitigating Action
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
Special needs adaptations
Page 192

Page 193

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
5
Project Life Financials 17,775 2,621 15% 17,950 175 1%
Current Year Financials 3,235 2,621 81% 3,410 175 5%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
6
Project Life Financials 500 0 0% (100) (600) -120%
Current Year Financials 100 0 0% 0 (100) -100%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
7
Project Life Financials 3,835 307 8% 3,380 (455) -12%
Current Year Financials 877 307 35% 422 (455) -52%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
8
Project Life Financials 21,073 2,479 12% 21,073 0 0%
Current Year Financials 4,435 2,479 56% 4,500 65 1%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
Anticipated Outcome
Budget spend anticipated, should criteria be met.
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
The main objective of the Buy Back Scheme is to bring former council properties that were sold through the RTB scheme, back
into council use.  These properties must assist the council with reducing housing need on the waiting list and where appropriate
assist with external capital works.  From 23/24, over 5 years, the buy back back scheme is benefiting from an additional £2m
investment each year, included in this revised budget, totaling £10m over 5 years, to futher reduce the waiting list.  The progress
will be monitored and reported as the financial year progresses.
Mitigating Action
None required.
Buy Backs
This is a budget to undertake specific projects that will deliver housing policies/strategies,
example: Ex local authority and mortgage to rent buy-back scheme
Mitigating Action
None required
Anticipated Outcome
Scheduled works to complete under current year budget.
Defective structures/component renewals
Defective structures 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Works expected to meet revised timescales which will be less than current year budget and therefore project will report an in year
underspend.
Main Issues / Reason for Variance
Contingent budget held for unplanned spend.
Mitigating Action
None required
Anticipated Outcome
Spend as required
Contingencies
This is a contingent budget for unforeseen matters which may arise during the year. 
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Pace of installations are ahead of targets as increased budget was anticipated. Officers will work to manage outturn to revised
budget and targets with likelihood of exceeding budget as demand and cost is higher than projected.
Mitigating Action
Officers will work to minimise any overspend whilst being mindful of tenant demand.
Anticipated Outcome
Full budget spend, possibility of overspend.
Modern facilities and services
New Kitchens, Bathrooms and Showers 
Planned End Date  Forecast End Date
Page 193

Page 194

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
HRA CAPITAL PROGRAMME
ANALYSIS OF GREEN PROJECTS
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
9
Project Life Financials 13,984 2,191 16% 13,984 0 0%
Current Year Financials 2,629 2,191 83% 2,629 (0) 0%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
TOTAL OF RED PROJECTS
Project Life Financials 104,007 14,420 14% 100,583 (3,424) -3%
Current Year Financials 22,103 14,420 65% 19,276 (2,827) -13%
Main Issues / Reason for Variance
No Issues, budget for salaries and support
Mitigating Action
None required
Anticipated Outcome
Full budget spend
Salaries/central support/offices
Allocation of costs from other WDC services who support the HRA capital programme 
Planned End Date  Forecast End Date
Page 194

Page 195

APPENDIX 6
WEST DUNBARTONSHIRE COUNCIL
HRA CAPITAL PROGRAMME
ANALYSIS OF RESOURCES
MONTH END DATE
PERIOD 10
Budget Forecast Spend
£000 £000 % £000 £000 %
1
Project Life Financials (46,875) (585) 1% (46,875) 0 0%
Current Year Financials (28,055) (585) 2% (6,885) 21,170 -75%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
2
Project Life Financials (8,646) (432) 5% (6,917) 1,729 -20%
Current Year Financials (1,729) (432) 25% 0 1,729 -100%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
3
Project Life Financials (311,208) (35,678) 11% (261,940) 49,268 -16%
Current Year Financials (95,062) (35,678) 38% (45,795) 49,267 -52%
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
4
Project Life Financials 0 (19) #DIV/0! (3,000) (3,000) #DIV/0!
Current Year Financials 0 (19) #DIV/0! (3,000) (3,000) #DIV/0!
Project Description
Project Lifecycle 31-Mar-28 31-Mar-28
TOTAL RESOURCES
Project Life Financials (366,729) (36,713) 10% (318,732) 47,997 -13%
Current Year Financials (124,846) (36,713) 29% (55,680) 69,166 -55%
Mitigating Action
None available
Anticipated Outcome
Income will be received when due
Other Capital Income
Other Income to capital
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Grant from Scottish Government in relation to properties bought back into Council stock.
Prudential borrowing incurred as required
None required
Anticipated Outcome
Income to Capital if possible
Prudential Borrowing
Prudential borrowing is long term borrowing from financial institutions that has been approved
for the purposes of funding capital expenditure
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Prudential borrowing is impacted by programme delivery.
Mitigating Action
None available at this time.
Anticipated Outcome
Mitigating Action
Income due to be received in line with spend incurred.
Mitigating Action
None required
Anticipated Outcome
Income due to be received
CFCR
This is capital spend which is funded by revenue budgets
Planned End Date  Forecast End Date
Main Issues / Reason for Variance
Contribution to Capital from Revenue in 23/24 expected to be minimal in 23/24 due to cost pressures in revenue.
Main Issues / Reason for Variance
31 January 2024
Budget Details Project Life Financials
Spend to Date Variance
New Build Grant
Grant to facilitate the building of new build housing 
Planned End Date  Forecast End Date
Page 195

Page 196

WEST DUNBARTONSHIRE COUNCIL APPENDIX 7
HRA CAPITAL PROGRAMME
ANALYSIS OF AFFORDABLE HOUSING SUPPLY PROGRAMME
MONTH END DATE
PERIOD 10
Budget Spend to Date Forecast Spend
£000 £000 £000 £000 %
RAG
Status
Haldane Primary School -                                                                             77                            77                                  77                            #DIV/0! 
Aitkenbar Primary School -                                                                             -                          -                                -                          #DIV/0! 
Clydebank East 37,992                                                                      12,370                    23,652                          14,340-                    -38% 
Creveul Court -                                                                             -                          -                                -                          #DIV/0! 
Dumbarton Harbour Ph 3  -                                                                             -                          -                                -                          #DIV/0! 
Queens Quay Site B 660                                                                            102                         250                               410-                         -62% 
Queens Quay Site C 25,175                                                                      3                              15,753                          9,422-                      -37% 
Pappert 13,276                                                                      212                         3,283                            9,993-                      -75% 
Bank Street 5,751                                                                         8                              2,176                            3,575-                      -62% 
Clydebank Health Centre 11,016                                                                      669                         6,315                            4,701-                      -43% 
Willox Park Phase1 6,185                                                                         113                         776                               5,409-                      -87% 
Willox Park Phase2 7,500                                                                         -                          7,500                            -                          0% 
Mount Pleasant 8,717                                                                         190                         190                               8,527-                      -98% 
Silverton 2,590                                                                         28                            27                                  2,563-                      -99% 
0 -                                                                             -                          -                                -                          #DIV/0! 
Gap sites
Gap sites budget remaining 9,182                                                                         -                          9,182                            -                          0% 
Bonhill Gap Site - all Bonhill Sites 245                                                                            0                              245                               -                          0% 
Bonhill Gap Site - Old Bonhill/ Campbell Street -                                                                             10                            -                                -                          
Bonhill Gap Site - O'Hare -                                                                             8                              -                                -                          0% 
Bonhill Gap Site - Braehead -                                                                             8                              -                                -                          #DIV/0! 
Clydebank Gap Sites ( prev Lilac Avenue) - unallocated 13,622                                                                      -                          13,622                          -                          0% 
Clydebank Gap Sites ( prev Lilac Avenue) - 7-9 Gilmour Avenue 50                                                                              39                            50                                  -                          0% 
Clydebank Gap Sites ( prev Lilac Avenue) - Queen Mary Avenue 50                                                                              14                            50                                  -                          0% 
Future New build sites 27,000                                                                      -                          27,000                          -                          0% 
28 Bridge Street Alexandria 23                                                                              162                         23                                  -                          0% 
Fees, Staffing Costs, contingency 8,097                                                                         -                          8,097                            -                          0% 
Total Expenditure 177,132 14,013 118,268 (58,863) 
31 January 2024
Site
Project Life Financials
Variance
Page 196

Page 197

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory & Regeneration
West Dunbartonshire Council – 27 March 2024
___________________________________________________________________
Subject: Representation on Outside Bodies
1. Purpose
1.1 The Council is asked to consider making a nomination to the Blindcraft Trust.
2. Recommendations
2.1 The Council is asked to nominate an elected member to the Blindcraft Trust.
3. Background
3.1 A request has been received from Glasgow City Council seeking the
nomination of an elected member to serve on the BlindCraft Trust which was
established in order to carry out the testamentary wishes of John Leitch by a
private Act of Parliament in 1825 which established an Asylum for the Blind in
the City of Glasgow - Act George IV CAD44 (private).
4. Main Issues
4.1 The Blind Persons Act 1920 imposed a duty on local authorities to make
arrangements for the promotion of the welfare of blind person’s resident within
their area, a responsibility which was carried out in combination with other
Councils.
4.2 In 2012 Glasgow City Council applied to the Office of the Scottish Charities
Regulator (OSCR) to obtain charitable status to formalise the arrangements in
relation to the funds and therefore must comply with the requirements of the
Office of the Scottish Charities Regulator (OSCR) and Trust legislation.  The
Trustees in this case hold the funds in trust for the purposes set out in the Trust
Deed.  A paper detailing the background and history of the Blindcraft Trust is
appended to the report.
4.3 The Council areas covered by the Blindcraft Trust are the following: Argyll &
Bute Council, West Dunbartonshire Council, South Lanarkshire Council, North
Lanarkshire Council, South Ayrshire Council, Glasgow City Council, Inverclyde
Council, East Ayrshire Council, Renfrewshire Council, Dumfries and Galloway
Council, Stirling Council and Falkirk Council.  Each of these areas have an
opportunity to nominate a Councillor to service as an ex officio Trustee to the
Trust.  The Trust meet twice per annum and meetings take place in spring and
in winter.  The Council is therefore invited to nominate an elected member to
serve on the Blindcraft Trust.
ITEM 13
Page 197

Page 198

5. People Implications 
5.1 There are no personnel issues.  
6. Financial and Procurement Implications 
6.1 The elected member nominated to serve on this outside body will be entitled 
to claim reasonable expenses incurred when attending meetings. 
7. Risk Analysis 
7.1 There are no risks associated with the recommendations of this report. 
However, failure to nominate a member to attend the Trust may result in
reputational damage to the Council. 
8. Equalities Impact Assessment (EIA) 
8.1 Screening complete – EIA not required. 
9. Consultation 
9.1 Officers in the Legal and Finance sections of the Council have been consulted
on the content of this report. 
10. Strategic Assessment 
10.1 The Council’s representation on the BlindCraft Trust will help contribute
towards achieving the Council’s strategic priority: 
• Inclusive and Adaptable. 
Alan Douglas
Chief Officer – Regulatory and Regeneration
Date: 29 January 2024 
Person to Contact:  Carol Ann Burns                        
Senior Democratic Services Officer 
Email: carol-ann.burns@west-dunbartonshire.gov.uk 
Appendices: Appendix 1 - Background and history of the Blindcraft Trust. 
Background Papers: Equalities Impact Assessment (EIA) 
Wards Affected: None. 
Page 198

Page 199

APPENDIX 1
1
Background and History of the Blindcraft Trust Fund
1. Background
1.1 The Blindcraft Trust was established in order to carry out the testamentary
wishes of John Leitch by a private Act of Parliament in 1825 which established
an Asylum for the Blind in the City of Glasgow - Act George IV CAD44 (private).
1.2 The Blind Persons Act 1920 imposed a duty on local authorities to make
arrangements for the promotion of the welfare of blind person’s resident within
their area, a responsibility which was carried out in combination with other
Councils.  Pursuant to this, a scheme was set up by the county councils of Argyll,
Ayr, Dumbarton, Lanark, Renfrew and Stirling and the town councils of the
Burghs of Airdrie, Ayr, Coatbridge, Dumbarton, Falkirk, Glasgow, Greenock,
Hamilton, Johnstone, Kilmarnock, Motherwell and Wishaw, Paisley, Port
Glasgow, Renfrew, Rothesay and Stirling to provide for the housing, education
and training of blind persons.  At a later date the County Council of Bute and the
Town Council of Dumfries also joined the Scheme.  Glasgow City Council
appears to have been the lead authority at that time. 
1.3 In order to facilitate the joint scheme a private Act of Parliament (The South West
of Scotland Blind Asylum Order Confirmation Act 1923) was passed transferring
the Royal Asylum for the Blind from its then managers to the Corporation of the
City of Glasgow which held the property on behalf of all the other Council’s in the
Scheme.
1.4 The Blind Persons Act 1920 was eventually repealed and the Social Work
(Scotland) Act 1968 imposed a general welfare function on the Councils.  Since
then the Social Work responsibility which includes welfare of the blind, was
transferred to the Regional Councils in the Local Government (Scotland) Act
1973 and then to the unitary authorities in 1994. 
1.5 Since that time various legislation has imposed general welfare obligations on
Councils including welfare of the Blind although this is subject to financial
restraints. 
1.6 Glasgow City Council do not have details of how long the joint scheme ran or
when it was wound up nor do we have any details of how the funds were
administered between 1937 and 1973.  Post 1973 Strathclyde Regional Council
ran workshops for the blind through Social Work Department (known as
“Blindcraft”).  The workshop and the Blindcraft Trust’s funds were administered
by a management committee and it appears that monies were paid out of the
funds either to individuals in the workshops who were blind or visually impaired,
or to the workshop itself.
Page 199

Page 200

Blindcraft Trust – updated November 2023 
2
1.7 At local government re-organisation in 1994 the Management Committee was
discontinued.   
1.8 In 2012 Glasgow City Council applied to the Office of the Scottish Charities
Regulator (OSCR) to obtain charitable status to formalise the arrangements in
relation to the Funds. This application was made as part of a Council wide review
of Sundry Trusts and Funds held by the Council. A list of the historic funds, which
have been transferred into the Blindcraft Charitable Trust, and their original
purposes are attached as part of the Trustee Induction Pack. 
2.  The Blindcraft Trust purposes and participating authorities 
2.1  A copy of the original Blindcraft Trust deed and a summary of the Trust deed are
attached. 
2.2  The charitable purposes of the Blindcraft Trust are:- 
(a)  The prevention or relief of poverty, the advancement of education, the relief
of those in need by reason of age, ill health, disability, financial hardship or
other disadvantage. 
The specific Trust purposes of the Blindcraft Trust as outlined in the Trust Deed
are:- 
(1)  to advance the education of individuals of all ages who are blind or visually
impaired with particular support being given to children from birth to 19 years
of age who have a right to statutory education, declaring that no support
shall be given in respect of any matters for which a local authority has a
statutory duty; 
(2) to relieve poverty amongst individuals who are blind or visually impaired and
in particular unemployed person through the promotion and/or provision of
training and skills of all kinds and particularly such skills as will assist such
residents in obtaining paid employment within the mainstream working
environment, declaring that particular support will be given to the Blindcraft
Factory run by Glasgow City Council for those who are blind or visually
impaired;   
(3)  to promote, establish and/or support other projects and programmes of a
charitable nature for the benefit of individuals who are blind or visually
impaired, including the advancement of the education of the public in general
in relation to individuals who are blind or visually impaired, providing such
other projects are ancillary to the activities carried on by the Trust in pursuit
of the objects (1) and (2) above. 
2.3 The Trust was activated in 2012 as part of a review of the Council’s Sundry Trusts
and Funds carried out by the Council’s Legal and Financial Services
Departments. The Trust is a charitable Trust and therefore must comply with the
requirements of the Office of the Scottish Charities Regulator (OSCR) and Trust
legislation.  The Trustees in this case hold the funds in trust for the purposes set
out in the Trust Deed. 
Page 200

Page 201

Blindcraft Trust – updated November 2023 
3
2.4 The Council areas covered by the Blindcraft Trust are the following: Argyll & Bute
Council, West Dunbartonshire Council, South Lanarkshire Council, North
Lanarkshire Council, South Ayrshire Council, Glasgow City Council, Inverclyde
Council, East Ayrshire Council, Renfrewshire Council, Dumfries and Galloway
Council, Stirling Council and Falkirk Council. Each of these areas will have an
opportunity to nominate a councillor to service as an ex officio Trustee to the
Trust. 
2.5 When the Blindcraft Trust was activated, the Blindcraft Trustees agreed that
certain changes to the Trust deed should be made to comply with Trust
legislation and OSCR Guidance. These changes are included in the Deed of
Variation which is attached as part of the Trustee Induction Pack. 
3.  Financial Position of the Trust 
3.1  The provisional closing balance of the Blindcraft Trust Fund as at 13th October
2023 is £196,116. 
3.2 The Blindcraft funds are currently held as part of the Council’s Sundry Trusts and
Funds portfolio. The Council’s Sundry Trusts and Funds portfolio is managed by
Ruffer Limited Liability Partnership, an investment management firm, appointed
by the Council.  The investment objectives of the Fund is to preserve the capital
over rolling 12 month periods, and secondly to grow the portfolio at a higher rate
(after fees) than could reasonably be expected from depositing the cash in a UK
bank.  The Fund is invested in a variety of different asset classes, including fixed
interest stocks and equities (both UK and international), and an allocation of
other risk investments designed to improve the overall return, but never to the
extent of risking serious capital loss. 
3.3 The Council’s Financial Services department prepares the Blindcraft Annual
Accounts, which are approved by the Trustees at the Blindcraft Annual General
Meeting and thereafter sent to OSCR.   
4. Administration of the Blindcraft Trust 
The Blindcraft Trustees have agreed the following: 
4.1  Meeting frequency: Twice per annum. Meetings take place in spring and in
winter. 
4.2  Spending restrictions: There are no spending restrictions in the Trust Deed
however the Trustees have agreed to limit grant expenditure to a pre-determined
amount which is reviewed annually. 
4.3  Trust Meetings and Award Process: 
Trustees will approve the Trust accounts prepared by the Council’s Financial
Services Department and audit report prepared by external auditors. 
Trustees also agree the level of Trust expenditure for that particular financial year
and confirm the organisations they wish to invite to make an application to the
Trust. It is recommended that one of these organisations is RSBi in order to
comply with the terms of the Trust Deed. 
Page 201

Page 202

Blindcraft Trust – updated November 2023 
4
The Trustees may wish to give the organisations an idea of the type of projects
which the Trustees would like to consider. 
The Trustees receive an update from the Council’s Customer & Business
Services as to the status of the applications made in the previous year. 
A small number of suitable organisations previously invited by the Trustees put
forward suggested proposals to the Trustees which would fit in with the Trust
purposes. The Council’s Financial Services Departments (Corporate Finance
and CBS) will have carried out financial and governance checks on these
organisations and will report their findings to the Trustees. The Trustees then
give consideration as to whether to award a grant to the organisations, to what
value and over what period.   
The values of grants from the Trust are currently agreed by the Trustees as the
following: 
Large grant - over £50,000 
Medium grant - between £5000 and £50,000 
Small grant - up to £5,000 
If the Trustees wish to fund any of the proposals put forward by the organisation,
the Trustees will then authorise the Council’s Financial Services Department
(CBS) to put in place monitoring arrangements to monitor the use of the
donations. 
Page 202

Page 203

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Council: 27th March 2024
_____________________________________________________________
Subject: Clydeplan and Regional Spatial Strategy Governance Arrangements
1. REASON FOR REPORT
1.1 The purpose of this report is to seek permission to formally withdraw from the
Clydeplan Joint Committee and agree to transfer the responsibility for the
development of a Regional Spatial Strategy to the Glasgow City Region
Cabinet.
2. RECOMMENDATION
It is recommended that the Council agree:
• To note the recommendation of the Clydeplan Joint Committee to
transfer responsibility for the development of a Regional Spatial
Strategy to the Glasgow City Region Cabinet;
• To note Glasgow City Region Cabinet’s approval of the establishment
of a new Regional Spatial Planning Sub-Committee to oversee the
development of a Regional Spatial Strategy;
• To note that approval of participation in any future Regional Spatial
Strategy will be a future decision for West Dunbartonshire Council;
• To formally withdraw from the Clydeplan Joint Committee and transfer
requisition funding to Glasgow City Council as lead authority for the
Glasgow City Region;
• To the participation in the Regional Spatial Planning Sub-Committee
• To confirm elected members, Councillor Lawrence O’Neill and
Councillor Gurpreet Singh Johal, and their respective successors as
Convenor and Vice Convenor of the Council’s Planning Committee,
as representatives on the new Regional Spatial Planning Sub-
Committee; and
• Request an update be brought to Planning Committee on progress of
the Regional Spatial Strategy within 12 months of the date of this
report.
3. BACKGROUND
3.1    The Planning Act (Scotland) 2019 removed the need to produce a Strategic
Development Plan and the adoption of National Planning Framework 4 on 13
February 2023 was the trigger for all strategic development plans and
associated supplementary guidance issued in connection with them to cease
to have effect. 
ITEM 14
Page 203

Page 204

Strategic Planning matters are now set out in National Planning Framework 4.
The Planning Act (Scotland) 2019 has introduced the concept of Regional
Spatial Strategies to provide a spatial representation of the key regional land
use issues requiring to be addressed across a region identifying strategic
development needs and priorities. Although non-statutory in nature (they do
not form part of the development plan and will not have a status in planning
decisions) they must be taken account of when a new Local Development
Plan is being prepared.
3.2    Since 1996 the eight Glasgow City Region local planning authorities have
worked together to develop a series of regional spatial plans, the most recent
being the Clydeplan Strategic Development Plan (“SDP”), which was
approved by Scottish Ministers in July 2017. It set out a Vision and Spatial
Development Strategy until 2036, indicating where new development should
be located and a policy framework that helps deliver sustainable economic
growth through the creation of high quality development which seeks to
reduce inequalities and enhances the quality of life in Glasgow City Region.
The Strategic Development Plan also set the strategy and policy context for
the individual local authority Local Development Plans. This is no longer
extant since the introduction of NPF4, and has been replaced by the
requirement to prepare a Regional Spatial Strategy. 
4. MAIN ISSUES
Governance
4.1    Clydeplan has been governed by a Strategic Development Planning Authority
Joint Committee for the purpose of representing them in carrying out the
functions conferred upon them under Sections 4 to 14 of the Town and
Country Planning (Scotland) Act 1997 (as amended by the Planning
(Scotland) Act 2019.  This Council has agreed the necessary resolution for
giving effect to this Agreement and currently this Council has two appointed
elected member representatives on the Clydeplan Joint Committee.  Planning
officers participate in the Clydeplan Steering Group and various sub-groups.
Renfrewshire Council is the host authority for the eight Local Authorities and it
provides Financial, Governance and HR functions for the Joint Committee on
behalf of the Member Authorities.
4.2   The Clydeplan Joint Committee has previously agreed that work should be   
undertaken to explore the future governance arrangements for the
performance of the functions undertaken by the Joint Committee particularly in
relation to the new duty on local authorities in relation to strategic planning as
part of the Planning (Scotland) Act 2019, to prepare a Regional Spatial
Strategy. Unlike the current Strategic Development Plan, the Regional Spatial
Strategy will not form part of the statutory Development Plan, which will now
comprise the National Planning Framework and the Local Development Plan.
Given these changes it was acknowledged that the role and remit for which
the Glasgow and Clyde Valley Strategic Development Planning Authority Joint
Committee was originally established will significantly change and therefore
the future role of the Committee required to be reviewed. 
Page 204

Page 205

4.3 The Joint Committee agreed to recommend this approach at its meeting on
24th January 2024, as did the Glasgow City Region Cabinet on 12th February
2024 to its members that the functions transfer to the Glasgow City Region,
with Glasgow City Region Cabinet overseeing the development of the
Regional Spatial Strategy. At the meeting on 12th February 2024, the Cabinet
agreed to establish a Regional Spatial Planning Sub-Committee to discharge
this function, subject to approval by the eight Local Authorities through their
own local democratic structures. Appendix 1 contains the report presented to
Glasgow City Region Cabinet.  Permission is now sought from West
Dunbartonshire Council to formally withdraw from the Clydeplan Joint
Committee and agree to transfer this responsibility to the Glasgow City
Region Cabinet. 
Proposed future approach
4.4    The report contained in Appendix 1 sets out the proposed approach to future
collaboration, based on three fundamental principles:
• A collaborative approach to regional spatial planning with all members
being equal;
• Integration with wider regional activity to maximise impact; and,
fundamentally;
• The need for local democratic accountability with no local authority
being bound by any decision they cannot support.
To achieve this, the new Sub-Committee will not have decision making
powers, but will oversee the development of a Regional Spatial Strategy for
the City Region. This will then be presented to the eight Local Authorities for
consideration, with Cabinet simply noting the approved document, once it has
been agreed by the eight Local Authorities. This ensures that approval sits
with local democratic structures whilst collaboration is facilitated through
regional ones. Under the new arrangements, West Dunbartonshire Council
will remain accountable and responsible for all planning decisions within the
area.  
5. People Implications
5.1 There are no personnel issues for this Council.
6. Financial and Procurement Implications
6.1 This Council currently pays a requisition of £68,375 to support staff and
associated costs with the operation of Clydeplan.  For 2023/24 there was a
reduction of the contribution by £15,000 and £25,000 for 2024/25. It is
proposed that this funding is transferred to Glasgow City Council as lead
authority for the Glasgow City Region to support staff and associated costs.
Page 205

Page 206

This will be managed through regional structures with the Finance Strategy
Group consisting of the 8 Finance Directors overseeing the budget and
reporting to the 8 Chief Executives. The final budget for the new Regional
Planning Sub Group will be approved by Cabinet on an annual basis. 
6.2   Appropriate due diligence will be carried out by Glasgow City Council and
Renfrewshire Council to ensure the transfer of assets. Any reserves will be
returned to the 8 constituent authorities following conclusion of the process.
7. Risk Analysis
7.1  It is clear that a sustainable future arrangement needs to be found which
satisfies the desire for democratically accountable governance, generates
efficiencies, develops a mutually agreed Regional Spatial Strategy and
delivers on the new programmes devolved to regional level. Without regional
planning there are key risks that local planning authorities will not co-operate
on cross boundary issues or plan for growth on a regional basis, all to the
detriment of individual Local Authorities and to the Glasgow City Region.
8. Equalities Impact Assessment (EIA)
8.1 The proposal has been screened and as it is not relevant to any of the areas
in term of EIA assessment, therefore no EIA is required.
9. Environmental Sustainability
9.1 A Strategic Environmental Assessment is not required.
10. Consultation
10.1 The Glasgow and Clyde Valley Strategic Development Planning Authority
Joint Committee agreed to recommend this approach at its meeting on 24th
January 2024, as did Glasgow City Region Cabinet on 12th February 2024 to
its members that the functions transfer to the Glasgow City Region, with
Glasgow City Region Cabinet overseeing the development of the Regional
Spatial Strategy. The eight Local Authorities have been involved in
discussions regarding the governance arrangements for Clydeplan and future
governance arrangements for the Regional Spatial Strategy.    
11. Strategic Assessment
11.1    The proposed development complies with the strategic priorities of the 
Council in particular:
• Our Communities Resilient and Thriving
• Our Economy Strong and Flourishing
Page 206

Page 207

Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 27th March 2024
___________________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager, 
Pamela.Clifford@west-dunbarton.gov.uk  
Tel no: 07774428221
Appendices: Appendix 1 - Glasgow City Region – City Deal Cabinet –
Regional Spatial Planning Arrangements 12th February
2024
Background Papers: Equalities Impact Assessment Screening
Wards Affected:   All Wards
Page 207

Page 208

OFFICIAL
OFFICIAL
Glasgow City Region – City Deal
Cabinet 
Report by Director of Regional Economic Growth
Contact: Kevin Rush (0141 287 4613) 
Regional Spatial Planning Arrangements
Purpose of Report:
The purpose of this paper is to propose a revised governance structure for the oversight of
the development of a Regional Spatial Strategy (RSS) for the Glasgow City Region (GCR)
following the recommendation of the Clydeplan Joint Committee in June 2023 to transfer
responsibility to the GCR Cabinet.
Recommendations:
Cabinet is asked to:
- Note the report;
- Agree to the establishment of a new Planning Sub-Committee with approval of a
Regional Spatial Strategy resting with the individual Member Authorities; and
- Agree this approach through their own democratic structures at the earliest opportunity.
Item
APPENDIX 1
Page 208

Page 209

OFFICIAL 
OFFICIAL
Introduction
1. The purpose of this paper is to propose a revised governance structure for the oversight of
the development of a Regional Spatial Strategy (RSS) for the Glasgow City Region (GCR)
following the recommendation of the Clydeplan Joint Committee in June 2023 to transfer
responsibility to the GCR Cabinet. 
2. The proposal requires endorsement from the GCR Cabinet and the 8 constituent Member
Authorities prior to implementation.
Background and the growth of City Regions 
3. Increasingly the role of city regions, through the establishment of City Deals and Regional
Economic Partnerships, are emerging as the key mechanism for the delivery on a number of
important agendas including: economic development, City Deals, climate change,
environmental improvement and strategic planning. 
4. In this context the new duty to prepare a Regional Spatial Strategy is key in planning for the
future development of the Glasgow City Region. 
5. Since 1996 the eight Glasgow City Region local authorities have worked together to develop
a series of regional spatial plans, the most recent being the Clydeplan Strategic
Development Plan (“SDP”), which was approved by Scottish Ministers in July 2017. 
6. The previous SDP set out a Vision and Spatial Development Strategy from now until 2036,
suggesting where new development should be located and a policy framework that helps
deliver sustainable economic growth through the creation of high quality development which
seeks to reduce inequalities and enhances the quality of life in Glasgow City Region. The
SDP also set the strategy and policy context for the individual local authority Local
Development Plans. 
7. This is no longer extant since the introduction of NPF4, and has been replaced by the
requirement to prepare an RSS. 
8. Since 2022, the City Region has seen a very significant increase in responsibility and budget
devolved to it from both UK and Scottish Governments. This includes a number of
programmes which have clear spatial planning elements to them. New programmes now
managed through the GCR PMO and overseen by Cabinet include:
Date of Award Programme Amount   
February 2022 Innovation Accelerator £33m
August 2022 UK Shared Prosperity Fund £74m
June 2023 Clyde Mission £26.5m
June 2023 Investment Zone £160m
November 2023 5G Innovation Region £3.2m 
9. Given this, a new Head of Place has been appointed to oversee the spatial planning
elements of the GCR Programme, including Clyde Mission, the development of a Clyde
Masterplan and the Investment Zone. Ross Nimmo, currently Head of Planning and
Development at Glasgow Airport, will take up this post on 4th March 2024. 
Page 209

Page 210

OFFICIAL 
OFFICIAL
10. There are clear synergies between this exciting new body of work and the development of a
Regional Spatial Strategy, and the opportunity to merge teams and governance could
generate significant opportunities and efficiencies for the Region. 
Governance Review 
11. The Clydeplan Joint Committee has previously agreed that work should be undertaken to
explore the future governance arrangements for the performance of the functions undertaken
by the Joint Committee particularly in relation to the new duty on local authorities in relation
to strategic planning as part of the Planning (Scotland) Act 2019, namely to prepare a
Regional Spatial Strategy. 
12. Unlike the current Strategic Development Plan the Regional Spatial Strategy will not form
part of the statutory Development Plan which will now comprise the National Planning
Framework and the Local Development Plan. 
13. Given these changes it was acknowledged that the role and remit for which the Glasgow and
Clyde Valley Strategic Development Planning Authority Joint Committee was originally
established will significantly change and therefore the future role of the Committee required
to be reviewed. 
14. Following the vote at its June 2023 meeting on a report on future arrangements, the Joint
Committee agreed to recommend the following option:
(a) That the contents of the report be noted;
(b) That the cessation of strategic development plans be noted; and
(c) That the preferred option for considering regional spatial strategy planning issues
going forward be that existing Clydeplan staff resource be reviewed in light of the
new requirements for RSS preparation. Staff would be consulted on a possible TUPE
transfer to Glasgow City Council. If transferred, the team would be integrated into the
existing city region structures (overseen by the Regional Director) who would take
responsibility for preparing an RSS and reporting this through to the GCR Cabinet
for approval. This would move the duty to prepare an RSS directly into the city region
governance structures.   
15. It should be noted that the individual Member Authorities need to take their own decisions
on how they wish to proceed with the development of Regional Spatial Strategies and the
Joint Committee’s recommendation. 
16. Since the June 2023 recommendation, two Councils have expressed views on the future
arrangements: 
- In September 2023, Renfrewshire Council approved the following motion:
“This Council notes the decision of the GCVSDPA (Clydeplan) Joint
Committee to recommend passing responsibility for the new Regional Spatial
Strategy to the Glasgow City Region Cabinet, however this Council considers
it premature to do so at this juncture as no guidance has been issued to date
as to the development of the RSS or the governance agreed between the
constituent authorities. 
The staff of the GCVSDPA (who are Renfrewshire Council employees) are
greatly valued for their skills and knowledge in this rapidly changing planning
Page 210

Page 211

OFFICIAL 
OFFICIAL
environment and should be fully supported and involved in any proposed
changes. 
The Joint Committee has successfully operated as a directly accountable
governance structure to all 8 local authorities regarding regional planning.
This council believes that the same principle should apply regarding the
development of the new Regional Spatial Strategies (RSS). For it to be equally
successful it must be founded in democratically accountable governance
structures which encourages neighbouring authorities to collaborate and
agree on any strategies that may have an influence on their own local planning
policies. 
Council therefore agrees that the Joint Committee should continue until
alternative suitable democratically accountable governance structures are
identified, agreed and approved by all constituent authorities for its
replacement with responsibility for delivering the new Regional Spatial
Strategy” 
- In December 2023, North Lanarkshire Council voted to formally withdraw from the existing
Joint Committee and will serve its two year notice from 31st March 2024. 
17. It is therefore clear that a sustainable future arrangement needs to be found which satisfies
the desire for democratically accountable governance, generates efficiencies, develops a
mutually agreed Regional Spatial Strategy and delivers on the new programmes devolved to
regional level.
Proposed way forward 
18. Recognising that consensus will always be sought, the proposal is based on three
fundamental principles: 
- A collaborative approach to regional spatial planning with all members being equal;
- Integration with wider regional activity to maximise impact; and, fundamentally
- The need for local democratic accountability with no local authority being bound by any
decision they cannot support
Ensuring local democratic accountability for the new Regional Spatial Strategy 
19. To secure local democratic accountability for the new Regional Spatial Strategy it is
proposed that a Glasgow City Region Spatial Planning Committee is established as a sub-
committee of the Glasgow City Region Cabinet, which is a Joint Committee established
under the Local Government (Scotland) Act 1973. Membership will consist of Planning
Conveners or equivalent from each of the local authorities. The Chair will be decided by its
membership. This Committee will oversee the development of a Regional Spatial Strategy for
the Glasgow City Region for approval by the 8 Member Authorities. The Directors /Heads of
Service with responsibility for Planning of each council will attend meetings in support of
members. 
20. This is the model used for the Education Collaborative which has been in operation since
2017. 
Page 211

Page 212

OFFICIAL 
OFFICIAL
21. The Spatial Planning Committee would not have decision making powers and would only
make recommendations on the Regional Spatial Strategy for consideration by the 8 Member
Authorities to ensure local democratic accountability. 
22. Ideally, all 8 Member Authorities would participate in an agreed Regional Spatial Strategy,
but this would be a matter for each Council to decide and it is within the gift of any of the
members to choose not to support the final strategy. 
23. The Cabinet would receive and note the Regional Spatial Strategy but only after approval by
all participating Member Authorities through their local democratic structures. This is similar
to the approach undertaken for recent regional initiatives such as the Shared Prosperity Fund
Investment Plan and no RSS could be presented to Cabinet without prior approval from its
constituent members. 
24. All efforts will be managed to agree consensus amongst the 8 members but a Regional
Spatial Strategy is not a statutory document and therefore, no local authority could be bound
to adopt an RSS without approval through their own democratic structures. The individual
authorities retain the right not to support or be bound by anything contained within the RSS. 
25. This approach was discussed at the Clydeplan Joint Committee meeting on 22nd January
2024 and there was widespread support for the approach, subject to necessary approvals
being sought. 
Process for agreeing new RSS  
Staffing 
26. The Spatial Planning Committee would replace the existing Clydeplan Joint Committee and it
is anticipated that staff and budgets would transfer into the existing City Region structures,
ensuring a more streamlined approach to audit, finance etc. with no requirement for separate
arrangements. Following appropriate consultation, the current Clydeplan and Green Network
Partnership team would transfer to Glasgow City Council under TUPE regulations (Transfer
of Undertakings (Protection of Employment) Regulations 2006) and be based within the City
Region PMO section where appropriate management arrangements will be put in place and
resilience and support will be available. The new Head of Place would oversee the transfer
and be responsible for developing the Regional Spatial Strategy for consideration by
members. 
27. If this approach was agreed, a paper would need to be taken through all 8 Member
Authorities agreeing to the windup of Clydeplan, the establishment of a new Spatial Planning
Committee and formalising the requirement for the agreement of all members before an RSS
could be presented to Cabinet. 
Draft RSS considered by Spatial
Planning Committee and
recommended for approval
Consideration by Member
Authorities
Approval by all Participating
Authorities Noting by GCR Cabinet
Page 212

Page 213

OFFICIAL 
OFFICIAL
28. This process would run over the next few months subject to all authorities reaching
agreement and due trade union/staff consultation. It is likely that revised governance
arrangements may take longer to embed but staffing transfers could progress more quickly. 
Budget 
29. The transfer of responsibility and staff to the GCR PMO is likely to generate efficiencies for
the Member Authorities, with no requirement for separate office accommodation or IT costs.
In addition, the GCR PMO has been effective in generating external funding from both
Scottish and UK Governments in recent years for spatial planning related activity, including
Clyde Mission and Investment Zone, and it is expected that this will reduce the burden on
Member Authorities in future years.
Recommendation 
30. Cabinet is asked to: 
- Note the report;
- Agree to the establishment of a new Planning Sub-Committee with approval of a Regional
Spatial Strategy resting with the individual Member Authorities; and
- Agree this approach through their own democratic structures at the earliest opportunity. 
Page 213