Appendix 5
EDUCATION
OPTIONS APPRAISAL
MINARD PRIMARY SCHOOL

Page 2

1.    INTRODUCTION
1.1  On 10th December 2019, Argyll and Bute Council approved the
continued mothballing on a temporary basis of Minard Primary School.
There have been no pupils attending the school since October 2018,
and as such, the school had been de facto mothballed since that time.
The Council agreed at that time that the mothballing of Minard Primary
School be continued on a temporary basis until December 2020, and
that the School premises be retained during this time on a care and
maintenance basis. The Council further agreed that in the intervening
period, Education Services would gather the necessary information,
identify all reasonable options in order to consider the future of Minard
Primary School in accordance with the preliminary requirements of the
Schools (Consultation) (Scotland) Act 2010. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=8513&V
er=4 
Further to this, on 8th December 2020, the Community Services
Committee agreed that Minard Primary School would continue to be
mothballed on a temporary basis until May 2021 and that the school
premises be retained during this time on a care and maintenance
basis. It was also agreed by the Community Services Committee that in
the intervening period, Education Services would undertake a pre
consultation meeting as part of the preliminary work and options
appraisal process when it was permissible under the Coronavirus
Regulations relating to public gatherings. The Education Service
intended to undertake the required preliminary consultation and an
options appraisal, for Minard Primary School in May 2021 but due to the
restrictions of the pandemic were unable to complete this work until the
last term. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=13970&V
er=4 
The statutory process for the closure of a rural school is laid out in the
Schools (Consultation) (Scotland) Act 2010 as amended by the
Children and Young People (Scotland) Act 2014. 
The Act, as amended, contains a presumption against closure of a
rural school and details specific requirements which the education
authority is required to follow if they are formulating a proposal to close
a rural school. This includes the introduction of a preliminary
consultation process.

Page 3

3 
In addition, the Community Empowerment (Scotland) Act 2015 sets out
a new right for community organisations to request the transfer of local
assets into local community ownership/management. Public bodies,
including councils, must consider such requests and respond to them
within a reasonable timescale. 
Minard Primary School has had zero pupils enrolled since October
2018.   
On 8th December 2020, Community Services Committee agreed that
the Education Service would undertake the preliminary requirements in
relation to considering a rural school closure and look at an options
appraisal for Minard Primary School. This review will enable the
Education Service to identify and consider the options put forward. 
The 2010 Act makes special arrangements in regard to rural schools
that is in effect a presumption against their closure.  There is a
requirement to have special regard to the rural schools factors prior to
formulating a proposal to close a rural school. In particular, it is
necessary to consider any reasonable alternatives before considering
closure. It is also necessary to consider the impact on the wider
community of a potential closure and the impact of any different travel
arrangements. These factors have been considered in this options
appraisal. 
2.  REASONS FOR THE PROPOSAL
2.1  An authority that is contemplating formulating a rural school closure
proposal must satisfy the preliminary requirements set out in section
12A of the 2010 Act before starting to prepare its proposal paper. In
particular, it must identify the underlying reasons why the future of the
School is being considered, which are as follows: 
1. Minard Primary School has been mothballed for four years. The
school roll was very low and not predicted to rise in the near future.
This continues to be the situation. 
2. Along with several other rural councils, Argyll and Bute is facing
increasing challenges in recruiting staff. In June 2022 there were
15.49 vacancies for both Head Teachers and Teachers. 
3. Whilst the School is mothballed, the building is deteriorating with
limited budgets for maintenance.

Page 4

4 
The Council is therefore considering the future of Minard Primary
School. The various options are explored within this paper. 
3.  BACKGROUND
Argyll and Bute is an area of outstanding natural beauty sitting within
an ancient landscape with a strong cultural identity. Today, the culture
of Argyll and Bute is reflected in its traditional industries of fishing,
farming and crofting, sports such as shinty and in its world class
musicians and artists as well as its modern commercial industries such
as wind turbine production and fish farming. Tourism also lies at the
centre of the economy. 
Argyll and Bute is geographically the second largest authority in
Scotland. Education is delivered in a range of settings including
schools, partnerships and youth services. 
3.1  Argyll and Bute Corporate Plan
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an
area of Scotland with outstanding places, people and potential for a
prosperous future for everyone. Our Council along with our Community
Planning Partners, is committed to ensuring that Argyll and Bute’s
Economic Success is built on a growing population. 
This strategic approach embraces the vision for our area, our
communities and our people as outlined in the Corporate Plan. Our key
service priorities support the delivery of our commitments in the plans,
helping to focus on local outcomes that will achieve meaningful
improvements for the area, our local communities and our citizens. 
Councils have a statutory responsibility in terms of the Local
Government in Scotland Act 2003 to achieve best value. Our
Community Services Asset Management Plan provides a review of the
property assets used to deliver services. It incorporates the School
Estate Management Plan which reflects the local implementation of
Building Better Schools: Investing in Scotland’s Future, the national
school estate strategy developed by the Scottish Government in
conjunction with local authorities. 
The aspirations, guiding principles and objectives contained within
Building Better Schools are reflected throughout Education and
Children’s Services Asset Management Plan (SAMP) for schools and
public buildings, both in the management of the existing assets and in
the design and construction of developments.

Page 5

5 
3.2  Our Children Their Future
Councils, as an Education Authority, have a statutory duty in terms of
the Education (Scotland) Act 1980 to make adequate and efficient
provision of school education across their entire area for the current
school population and future pattern of demand. This is reflected in Our
Children, Their Future: Education Vision and Strategy. 
3.3  Minard and the Local Area – the Minard Primary School Setting
Minard lies on the western shore of Loch Fyne, with beautiful views
and 4 miles southwest of Furnace. Minard Castle lies a mile to the
south. Minard is a linear village of just under 2 miles long, with loch
side bungalows, along the A83 road to the south is the school, church,
village hall and several older cottages. Minard was originally part of the
estate of Minard Castle before becoming an independent village. 
Minard is approximately 13.13 miles away from Lochgilphead and 20
minutes travel time. 
3.4  The School within the Community
Minard Primary School was previously very active within the
community. Pupils would often use the local area for outdoor learning,
including Crarae Gardens and also work with local businesses and
other cluster schools. The school has not been used by the local
community since it has been mothballed and there has been one
request locally to use the grounds recently. The request was made in
May 2022 by a representative of a local parent and baby/toddler group. 
3.5  Population
Argyll and Bute has an average population density of just 0.13 persons
per hectare. This coupled with the changing demographic profile of the
area presents one of our greatest challenges. The table below refers
directly to the Minard area showing the changing population from
census 2001 to census 2011: 
Table 1: Population Information
Minard Area Census Ref : Data from Scotland’s Census website
2001 2011
Total Resident
Population
70 Total Resident
Population
71
% under 16 15.71 % under 16 14.1
% 16 – 64 (pensionable
age)
57.14 % 16 – 64 (pensionable
age)
59.2
%  pensionable age 27.14 %  pensionable age and 26.8

Page 6

6 
and over over 
It is recognised that the census area and the catchment area Minard
Primary School differ slightly. 
3.6  Development and House Building
A new Local Development Plan (LDP2) is now available, which sets out
planning and development proposals for the next 10 years from 2020
and a vision for 20 years.  The Argyll and Bute Local Development
Plan provides the local planning framework for the Council area,
excluding the Loch Lomond and Trossachs National Park area. The
Plan is divided into the written statement and proposals maps. The
written statement provides the general policy context against which
planning applications for new development proposals should be
assessed. This is supported by the proposals maps which show the
range of development opportunities and constraints within the area, for
example:
 the key development areas i.e. the allocations for housing, industry
and business, community facilities and infrastructure;
 the potential areas for future development (Potential Development
Areas);
 areas requiring actions such as environmental improvement or
regeneration (Areas for Action); and
 environmental designations such as national Scenic Areas, Sites of
Specific Scientific Interest (SSSIs), Special Protection Areas and
Local Nature Conservation Sites.
Appendix 1 shows the LDP 2 for Minard. 
Appendix 2 shows the LDP 2 for Furnace.
Appendix 3 shows the LDP 2 for Lochgilphead areas
Appendix 4 provides the key for Local Development Plans. 
3.7  Minard Primary School
The school is situated in the village of Minard, on the shores of Loch
Fyne, in Mid-Argyll, on the A83 between Inveraray and Lochgilphead.
The school, which was purpose built to deliver education, in 1871, is of
traditional rural design. 
The Council's title to the building was obtained from Thomas Owen
Lloyd in favour of the School Board of the Parish of Glassary, dated 22
February and recorded GRS (Argyll) 19th March, both 1906.Legal
Services and Estates indicate there is a burden in the title from 1906 to
the effect that the subjects are to be used for educational purposes and
for no other purpose. However Conveyancing Team within Legal

Page 7

7 
Services have investigated and in providing a copy of the title plan it
clearly shows that the area of ground in question was in fact within the
Council's school title and it was transferred to the Community Trust in
2006. 
The building itself comprises one classroom with dining area, corridor
with cloakroom, toilets and office. The school is well equipped with
disabled access and facilities. 
The school is co-educational and non-denominational and has a
catchment area extending from Crarae Gardens to Nursery Cottages in
Minard village. 
Appendix 5 shows the Minard Primary School Floor Plan. 
Minard Primary School is 13.13 miles from Lochgilphead Joint
Campus. Minard Primary is 3.83 miles from Furnace Primary. The area
is sparsely populated. All three schools are situated along the A83. 
The Scottish Government’s Rural School List 2017 classifies Minard
Primary School as ‘very remote rural’.  This is defined as an area with a
population of less than 3,000 people, and with a drive time of over 60
minutes to a settlement of 10,000 or more. Minard Primary is one of 6
primary schools that has children transferring to secondary education
at Lochgilphead High School. 
3.8  Furnace Primary School and Lochgilphead Joint Campus
Following the mothballing of Minard Primary School, children living
within the catchment area attended Furnace Primary School or
Lochgilphead Joint Campus. Furnace Primary School is a non-
denominational and co-educational school situated in the village of
Furnace off the main A83 road. Furnace Primary school is a small rural
school which occupies a central position in the village of Furnace. It
currently has a significantly falling roll, with 8 children expected to be
attending the school in August 2022. The school will have a shared
Head Teacher with Inveraray Primary from August 2022. 
Appendix 5 shows the Minard Primary Floor Plan 
Appendix 6 shows the Lochgilphead Joint Campus Floor Plan 
Appendix 7 shows the Furnace Primary Floor Plan 
Furnace and Lochgilphead Joint Campus buildings have facilities for
pupils, visitors and special access needs. The Scottish Government’s
Rural School List 2017 classifies Furnace Primary School as ‘very
remote rural’. Lochgilphead Joint Campus is the associated Secondary

Page 8

8 
School for Furnace and Minard Primary Schools and classified as
‘remote rural’. 
The Map below shows the adjoining catchment areas of Minard and
Furnace Primary Schools and Lochgilphead Joint Campus Catchment
Areas: 
© Crown copyright and database right 2022. All rights reserved.
Ordnance Survey Licence number 10002336 
3.9  Pupil Numbers
Pupil projections, and data for 2021-22 are based on the 2018 pupil
census, a return prepared annually for the Scottish Government. Past
pupil numbers are historic data from past pupil censuses. Pupil
projections for future P1 intakes are from NHS data taken from children
registered with GP practices in the area. This data is anonymised. 
Table 2 shows the historic and current pupil numbers for Minard,
Furnace and Lochgilphead Primary schools:

Page 9

9 
Table 2:  Minard PS  Furnace PS Lochgilphead PS  
Roll Roll Roll
Capacity 33 50 249
2011-2012 10 21 213
2012-2013 9 18 221
2013-2014 6 12 231
2014-2015 8 10 230
2015-2016 6 7 233
2016-2017 5 7 221
2017-2018 1 6 221
2018-19 3 13 227
2019-20 0 10 226
2020-21 0 12 207 
Table 3 shows projected rolls for Furnace and Lochgilphead Primary 
Schools and estimated numbers of pupils in the Minard Primary School
catchment area according to figures held by Argyll and Bute Council:    
Table 3:  Minard PS Furnace PS Lochgilphead PS  
Roll Roll Roll
Capacity 33 50 249
2022 -2023 6 7 192
2023 -2024 4 7 189
2024-2025 2 10 191 
* A prediction based on information available June 2022 
4.  COMMUNITY ENGAGEMENT 
4.1  Meetings
A Community ‘drop in’ Engagement session was held in Minard
Primary School, on 19th May 2022 from 9.30am-6pm.  This was to seek
the views of the community on the future of Minard Primary School.
Members of the community could ‘drop in’ throughout the day and give
their views to Education Officers and receive information on the Pre-
consultation process. This session was attended by 19 people. Notes
from this session with comments from the community can be found in
Appendix 8. There were also meetings in Furnace and Lochgilphead
Primary Schools to gather opinions from the young people from within
the catchment area for Minard School. The Education Officer leading
the Pre-consultation met with the children during May 2022 so that they

Page 10

10 
could contribute to the process and their views are reflected in the
paper. 
4.2  Content of Meetings 
Attendees at the meetings were given an overview of the information
that the Council would be using in this Options Appraisal, this included
previous pupil rolls, pupil projections, background information and
details of the pre-consultation process. 
The questions were as follows: 
Over the last three years, what has been the effect of mothballing
Minard School on you, your family and community? 
In your view what are the pros/cons of the following options:
 Continue with mothballing
 Re- open the school
 Close the school 
Attendees also noted questions regarding the future of the school, and
points of information that should be considered in the Options
Appraisal. 
4.3  Feedback 
There was a range of viewpoints on the future of Minard School:
 Community and Parents
The majority of the community acknowledged how the future
of the school needed to be considered now. Many
understood that in order to be a viable option for schooling,
there was an agreement that the low numbers of children did
not make the re-opening of the school realistic.  There was a
small percentage of people in support of continued
mothballing in order to retain the building in case of future
need. One family of children currently attending another
school locally were keen that the school should re-open;
while other families are satisfied with the current
arrangements of their children attending a bigger school. 
 Children/young people
A few of the children expressed their desire to attend Minard
Primary School however, the majority of children voiced they
loved being at another primary school but that closing the

Page 11

11 
Minard Primary School made sense to them, due to small
numbers of children involved. 
 Staff
Staff members were sad at the thought of the School being
closed but acknowledged that without a significant number of
pupils re-opening the school is not viable. 
General Comments:
“This was a vibrant school at the heart of the community. When my
children came here – there were 30 children here. Those children have
gone on to be very successful. They also have a community minded
approach to life. Children gain so much from the community that is
valuable. How can that be provided by a bigger community? When the
children were here, they would feel the support from the other
members of the community.” 
“There was such a pride in the school – with different activities,
including coffee mornings – the whole community supported the
children in many ways. 
When you have an education in a school like this, it stays with you.” 
“Not enough children in the locality for the school to be opened as an
educational establishment.” 
5.0  THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE
PROPOSAL AS CONSIDERED BY THE COMMUNITY
ENGAGEMENT
Minard Primary School has been mothballed for 3 years. The school
roll was very low and not predicted to rise significantly in the near
future. This continues to be the situation. There is concern about the
future of the school and a collective wish within the community for it to
re-open, but also an understanding that the numbers of young children
locally means that this may not be viable. 
Whilst the building is mothballed it continues to deteriorate. The
Community would like to see the building put to good use. Along with
several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. In June 2022 there were 15.49 fte
vacancies for both Head Teachers and Teachers. 
The Council is required to consider the future of Minard Primary
School. The following options are explored within this paper:

Page 12

12 
a) Re-open Minard Primary School.
b) Continued Mothballing of Minard Primary with the pupils zoned to
Furnace Primary School.
c) Close Minard Primary School and realign its catchment area to
Furnace and Lochgilphead Primary School.
6. OPTION A: RE-OPEN MINARD PRIMARY SCHOOL 
6.1  Community Feedback
Ten community members who attended the Pre-consultation meeting
were in favour of the school opening but felt it was linked to ensuring
there is affordable housing in the area to attract more families. After
school care was also a feature in meeting the needs of families and the
feasibility of the school re-opening. The previous success of the school
was recognised and there was some feeling that this should be
available for the next generation. There was recognition that the school
was at the heart of the community and the community have lost local
amenities and concern that the village will lose its vibrancy and
become less sustainable. There were also community members who
felt that the numbers of children on the roll were so low now and in the
future that a local village school was sadly no longer viable. 
“There needs to be sufficient numbers of children in the school so that
a child is not there on their own.” 
“If folk know if there is a school in the village area – it may attract more
people here – there were only ever good reports about the school and
former pupils should be able to access the school. The village needs
new life rather than the older demographic – we need to attract new
younger members of the community.” 
“There are not any children to make it viable at the moment.” 
“As a parent, I would send my child to Minard PS. The community want
the school to open but the question would be if other parents would
send their child to Minard. After school provision is an issue. A school
makes a community. Everything has already closed here. The sense of
isolation as a young family……I don’t see anyone in the community.” 
Why has this happened? I find this very upsetting to look at the school
like this – I know there are not a lot of children in the village but could
the school be used for adult purposes too?

Page 13

13 
6.2 Pupil Numbers
If the school were to reopen in August 2022, the maximum pupil
numbers from the catchment would be six. It has been stated that
without a viable number of pupils for the school, some parents would
not be considering placing their children at Minard Primary School if it
were to re-open. 
If the school were to re-open sustainability may not be viable due to the
fact that pupil numbers over the next four years are not predicted to
rise, indeed they would decline further and are well below the capacity
of the school building. 
Table 4: Pupil Numbers
Minard
Primary
2021/2022 2022/202
3
2023/2024 2024/2025 2025/2026
Approved
Capacity
33 33 33 33 33
Roll
Projection
6 6 4 2 1 
6.3 Financial Information
The total amount including employee; premises; supplies and services
and catering consideration to re-open the school is £137,511. 
The annual cost of mothballing Minard Primary School is £8,956. 
The cost to bring the educational building to an acceptable standard to
re-open the school is £36,500.  The cost to open the school house, if
required, to an acceptable standard would be £21,500. 
6.4  Assessment of Rural Factors 
The reasons why the future of Minard Primary School is being
considered are as stated at Section 2 of this Report. There is no
expectation for the pupil numbers at Minard Primary School to increase
significantly without development in affordable housing. Minard Primary
School is currently mothballed and at the time of writing, there are 7
current pupils in the Minard catchment area. To reopen the school
would not necessarily increase the pupil numbers.   
6.4.1  Community Impact
The reopening of the school would more easily allow the
school’s premises to be used by the community. It would also be
a possibility that the school pupils would invite the community to

Page 14

14 
specific events. The presence of a school and the
facilities/activities that may be offered could make the area a
more attractive place to live. Reopening the school may
therefore encourage families with school age children to move to
the community. This in turn may make the community more
sustainable. 
Many who attended the community engagement indicated the
need for the school premises to be used for a community
purpose in the future if it did not re-open. 
Respondents noted the negative impact of the school
mothballing on the community as:
 The continued deterioration of the building. 
 Schooling not being available within the village may be a
factor in not attracting and retaining young families to the
area.  
 A lack of focus for significant aspects of community life that
the school previously provided for all generations within the
community. 
If the school were to reopen as an educational establishment
there would be an economic impact with respect to the
considerable expenditure needed to bring the building up to
standard.  There would also be costs relating to staffing, and
ongoing maintenance.  The reopening of the school and the
potential relocation of families may have a positive effect on the
wider economy of the community. 
6.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Minard
Primary to Furnace Primary is 3.82 miles via the A83. Travel
time is approximately 7 minutes by car. The travel arrangements
have been in place for more than three years. 
The travel distance (sourced from Google maps) from Minard to
Lochgilphead Joint Campus is 13.13 miles via the A83. Travel
time is approximately 19 minutes by car. Travel is an accepted
aspect of living in the Minard community. 
If Minard Primary School was to reopen there could be a
positive impact on the health and wellbeing of pupils who are
able to walk or cycle to school. Staff would either travel to the
school by car, or if they live locally could walk or cycle. There
may be a positive environmental impact as the use of vehicles to

Page 15

15 
transport pupils may decrease. Conversely, there could be
increased car usage by staff which may mean these travel
arrangements have a negative environmental impact. The
respective positive and negative impact may therefore balance.   
6.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. There are no specific
educational benefits from reopening the school as all schools
implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
With respect to outdoor learning community spaces could be used
either in the school grounds or in the immediate neighbourhood if the
school were to reopen.  Outdoor learning is provided by all schools. 
There would be issues with respect to the current condition and
suitability of the school buildings and facilities which would negatively
impact learning and teaching.   
6.6  Summary 
Some community members, including some parents, are in favour of
re-opening the school. Others recognised that the school may not be
viable due to low pupil numbers. If the school reopened, pupil numbers
would be low and are currently projected to decline further. 
There are financial implications if the school is to be reopened.  The
total amount including employee; premises; supplies and services and
catering consideration to re-open the school is £137,511 with the cost
to bring the property to an acceptable standard to re-open the school is
£36,500.  The cost to open the school house, if required, to an
acceptable standard would be £21,500. 
If the School was to be reopened, the premises would be able to be
used by the community, in addition to its use as an educational facility.
The reopening of the School may encourage families with school age
children to move to the community, which may make the community
more sustainable.

Page 16

16 
The travel distance (sourced from Google maps) from Minard Primary
to Furnace Primary is 3.82 miles via the A83. Travel time is
approximately 7 minutes by car. The travel arrangements have been in
place for more than three years. 
The travel distance (sourced from Google maps) from Minard to
Lochgilphead Joint Campus is 13.13 miles via the A83. Travel time is
approximately 19 minutes by car. Travel is an accepted aspect of living
in the Minard community. If Minard Primary School was to reopen there
could be a positive impact on the health and wellbeing of pupils who
are able to walk or cycle to school. Staff would either travel to the
school by car, or if they live locally could walk or cycle. There may be a
positive environmental impact as the use of vehicles to transport pupils
may decrease. Conversely, there could be increased car usage by staff
which may mean these travel arrangements have a negative
environmental impact. The respective positive and negative impact
may therefore balance. 
There are no specific educational benefits from reopening the school
as all schools implement Curriculum for Excellence ensuring effective
learning and teaching which is matched to the needs of children. 
When considering projected low pupil numbers, the challenges in
recruiting teaching staff and the considerable expenditure needed to
bring the building up to standard, these need to be balanced against
some members of the community’s  opinion on whether the school
should re-open or not. For these reasons, this is not considered to be a
reasonable option. 
7.  OPTION B: CONTINUED MOTHBALLING OF MINARD PRIMARY
SCHOOL WITH PUPILS ZONED TO FURNACE PRIMARY
SCHOOLS 
The Statutory Guidance for the 2010 Act, in relation to mothballing,
states “the maximum length of its duration is likely to depend on the
location of the school and the desirability of maintaining capacity to re-
open a school there, but it is unlikely that it should exceed 3 years in
areas that are not very remote.” Minard Primary School has been
mothballed for 4 years. 
It should be noted that part of this time has been during a pandemic
and the Council had hoped to consider options for the school
previously, but this was curtailed due to restrictions.

Page 17

17 
7.1  Community Feedback
There are many ideas for the future of the building being taken forward
by the community as a hub for community life. Some members of the
community felt that the school should continue to be mothballed to see
if in the longer term more families would move into the area post-
COVID. There was a significant view at the community meeting that
mothballing the school over a long period is wasteful due to
deterioration of the property and should not be prolonged. It was hoped
that a decision about the future of the school, whatever it may be would
be taken in the near future. 
“Mothballing the school has had a huge impact on community
cohesion.” 
“Families have been forced into going elsewhere and now they don’t
know what they are missing.” 
“No focal point left for the village.” 
“Would encourage a decision to be made about the future of the
building and grounds sooner rather than later.” 
“Should we continue to mothball to see how post-pandemic living
impacts on choices open to parents? The increase in home working
could make the local school more viable?” 
“Could the school be used by the community in a more productive way
whilst mothballed?” 
7.2 Pupil Numbers
Pupil numbers are not projected to increase over the next 4 years, they
will be in decline, as per Table 4 above.   
7.3  Financial Information
The current annual cost (2021/22) to the Council of the mothballed
Minard Primary School is £8,956. This includes electricity, heating oil,
and ground maintenance but does not include building maintenance
and repair costs. Neither does it take account of the cost to bring the
property to an acceptable standard to re-open the school which is
£36,500.  Current annual transport cost of taking pupils to alternative
schools is £1,482. 
7.4  Assessment of Rural Factors

Page 18

18 
The reasons why the future of Minard Primary School is being
considered are as stated at Section 2 of this Report. There is no
expectation for the pupil numbers at Minard Primary School to increase
significantly. Minard Primary School is currently mothballed and
although there are currently no registered pupils, pupils would be
rezoned to another local school. To reopen the school would not
increase the pupil numbers. 
7.4.1  Community Impact
If pupils are to continue their education in other primary schools
whilst Minard Primary School remains mothballed there would
be no change to the current impact on the community. While
some families are satisfied with current arrangements, others
report to feeling isolation.  If the mothballing of Minard Primary
was to continue the building would deteriorate further and
eventually become unavailable. This could have a detrimental
effect on the sustainability of the Minard community. At present
the school grounds are available for community use.  The
community view the buildings and grounds as an opportunity to
develop as a community and there were multiple suggestions for
possible usage, as outlined in Appendix 8. This may make the
area a more attractive place to live. 
7.4.2  Travel Arrangements
There is no change to the travel arrangements that are currently
in place nor to the environmental impact from these.  The travel
distance (sourced from Google maps) from Minard Primary to
Furnace Primary is 3.82 miles via the A83. Travel time is
approximately 7 minutes by car. The travel arrangements have
been in place for more than three years. 
Some parents in the current catchment area have chosen to
have their children attend Lochgilphead Joint Campus as they
work within that community. The travel distance (sourced from
Google maps) from Minard Primary to Lochgilphead Joint
Campus is 13.13 miles via the A83. Travel time is approximately
19 minutes by car. Travel is an accepted aspect of living in the
Minard community. Continued mothballing of Minard Primary
School would have no effect on current staff travel. The small
number of children has minimal effect on staffing within the
receiving primary schools.

Page 19

19 
7.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. There are no specific
educational benefits from reopening the school as all schools
implement Curriculum for Excellence ensuring effective learning and
teaching which is matched to the needs of children. 
Minard, Furnace and Lochgilphead are remote rural schools. Minard
and Furnace Primary Schools are set within a very remote rural area,
Lochgilphead Primary is classified as a remote rural school (Scottish
Government classification October 2021). Children from Minard area,
attending Furnace and Lochgilphead Primary School are benefitting
from the rural broader environment, whilst not moving their learning to
a school that is completely different to their home environment. 
The co-location of the nursery and the primary classes at Lochgilphead
Primary enhances the transition process for the children moving from
Nursery into Primary one, through joint educational processes and
liaison between the two settings. Transition to secondary school is
enhanced through joint planning and educational experiences. 
7.6  Summary
The majority of people who attended the consultation were not in
favour of further continuing the mothballing of Minard Primary School.
A few people felt it would be beneficial to mothball for longer as there
was a possibility of attracting more young families to the village post-
COVID. There was a significant view at the community meetings that
mothballing the school over a long period was wasteful due to
deterioration of the property and potentially affected sustainability of
the community. Pupil numbers are not predicted to rise significantly in
terms of pre-school children living within the catchment area, indeed
they are in decline. Mothballing had no positive impact on the reasons
for the proposal. 
The current annual cost (2021/22) to the Council of the mothballed
Minard Primary School is £8,956. This includes electricity, heating oil,
and ground maintenance but does not include building maintenance
and repair costs. Neither does it take account of the cost to bring the
property to an acceptable standard to re-open the school which is
£36,500.  The current annual transport cost of taking pupils to
alternative schools is £1,482.

Page 20

20 
The travel distance (sourced from Google maps) from Minard Primary
to Furnace Primary is 3.82 miles via the A83. Travel time is
approximately seven minutes by car. The travel arrangements have
been in place for more than three years. Some parents in the current
catchment area have chosen to have their children attend
Lochgilphead Joint Campus as they work within that community. The
travel distance (sourced from Google maps) from Minard Primary to
Lochgilphead Joint Campus is 13.13 miles via the A83. Adverse
weather can be a factor, however this is the same for other local
schools and areas.  Should the school continue to be mothballed these
travel arrangements would continue. 
There are no specific educational benefits from continuing the
mothballing of Minard Primary school. 
On the basis that pupil numbers are declining and the building’s
mothballing is not of benefit to the community or the Council, continued
mothballing of Minard Primary School is not viewed as a reasonable
option. 
8.  OPTION C: CLOSE MINARD PRIMARY SCHOOL AND REALIGN
THE CATCHMENT AREA FOR FURNACE AND LOCHGILPHEAD
PRIMARY SCHOOLS TO INCLUDE THE CURRENT MINARD
CATCHMENT AREA 
9.1  Community Feedback
Some people who attended the Options Appraisal meeting were not in
favour of reopening Minard Primary as a school. They commented that
there were not enough children to support re-opening the School.
Additionally, with respect to low numbers in future school roll
projections, the sustainability of the School did not support re-opening
of the School. Comments in relation to the closure of Minard Primary
School:
There are positives and negatives around a small school and a big
school. Quality of leadership is a factor and lack of staff is also an
issue. 
You lose culture when you lose a small school. 
Many community members commented on the school premises and
potential for this to become a community asset:

Page 21

21 
‘The building to be used for a purpose to benefit the community for
example a community hub with a shop and café.’ 
‘The community has lost the shop, post office and now school, we feel
it is crucially important that this building is retained to build the
community.’ 
Community members discussed pursuing options for use of the
building as a community hub. 
9.2  Pupil Numbers
Table 5: Schools Occupancy: 
Minard
Primary
2022/2023 2023/24 2024/25
Approved
Capacity
33 33 33 
Projected
Roll 
6 4 2 
Occupancy 18% 12% 6% 
9.3  Financial Information
Transport costs taking pupils to alternative schools are £1,482. If
Minard Primary School were to be closed it would generate savings of
£8,956 - the current annual cost of mothballing (2021/22) to the
Council. This includes electricity, heating oil, ground maintenance,
building maintenance and repair costs. 
If parents choose to send their children to Lochgilphead Joint Campus,
there will be no increase in costs regarding transport as there is
capacity in the current system. 
9.4  Assessment of Rural Factors 
The reasons why the future of Minard Primary School is being
reviewed are as stated at Section 2 of this Report. There is no
expectation for the pupil numbers at Minard Primary School to
increase. Minard Primary School is currently mothballed and pupils are
rezoned to other schools. To reopen the school would not increase the
pupil numbers, however some members of the community feel that a
local school would attract families to the area.   
9.4.1  Community Impact
The community had differing opinions on the closure of the
school. Some would like the school to reopen, some reluctantly
accepted that numbers were so low the school may not be viable

Page 22

22 
in the long term. All agreed that they would want a decision
made and that it would be retained for community use, and not
be allowed to fall into a state of disrepair. Within Minard there is
a village hall. While it is accepted that school closure may have
an adverse effect on a community, a vibrant community hub
could be an asset to a community. This could potentially have a
very positive impact on sustainability of the community if this
option were to progress. If the Community wished to create a
community hub, they would require to find a mechanism to
acquire the property from the Council and deliver that aspiration.
The buildings forming the school premises are situated within
walking distance of the village. If the local plans for the building
progress, this would have a positive impact on the sustainability
of the village. Formal closure of the school would mean that
these plans could potentially be progressed by the community. 
9.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Minard
Primary to Furnace Primary is 3.82 miles via the A83. Travel
time is approximately seven minutes by car. The travel
arrangements have been in place for more than three years.
Travel is an accepted aspect of living in the Minard community.
However one family has expressed strongly that they are
finding the travel arrangements in place for Furnace very
difficult.   
Transport costs for pupils to Furnace Primary are £1,482. 
Other families in the Minard area have chosen to place their
children at Lochgilphead Joint Campus due to their own work
and family commitments and have made their own travel
arrangements. The travel distance (sourced from Google maps)
from Minard to Lochgilphead Joint campus is 13.13 miles via
A83. Travel time is approximately 19 minutes by car. This option
would have no effect on the current travel arrangements of staff.
There would be no additional travel costs for children attending
Lochgilphead Joint Campus as there is capacity in the current
system. 
The closure of Minard Primary School, in terms of travel would
have a neutral effect on the environment.   
9.5  Educational Benefits

Page 23

23 
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. There are no specific
educational benefits as all schools implement Curriculum for
Excellence ensuring effective learning and teaching which is matched
to the needs of children. 
It is proposed that children in the Minard catchment area would be
directed to Lochgilphead Joint Campus or Furnace Primary, depending
on where they live in the catchment area. The proposal is that children
living in the north section of catchment area from Achagoyle Bay to
Blackstone Bay attend Furnace Primary (with the section of Minard’s
catchment area being subsumed by Furnace Primary School) and
children in the south section of the catchment area from Achagoyle Bay
to Kilmichael Beg attend Lochgilphead Joint Campus (with that section
of Minard’s catchment area being subsumed by Lochgilphead Primary
School). 
Both Minard and Furnace are very remote rural schools. Lochgilphead
Joint Campus is a remote rural school. Each school is set within a
remote rural area (Scottish Government classification).   
Furnace Primary
Children from Minard area from Achagoyle Bay to Blackstone Bay who
would attend Furnace Primary School are benefitting from the rural
environment and the strengths that a small village primary can offer.
Good quality outdoor learning is currently provided at Furnace Primary. 
In Furnace Primary School children are taught in classes composed of
children from more than one year group. Children benefit from being
part of a strong social context in which they can build relationships with
different groups and individuals, develop social skills, meet challenges
and exercise responsibilities as members of a social group. They are
able to interact and socialise with groups of children of their own
gender, take part in team activities and move with their peers as an
established friendship group to secondary school at Lochgilphead Joint
Campus. 
Lochgilphead Joint Campus
Children from the Minard catchment area from Achagoyle Bay to
Kilmichael Beg who would attend Lochgilphead Joint Campus would
benefit from learning within a bigger context and community. Children

Page 24

24 
are taught in single year groups and there is a wide range of expertise
within a larger staff team. 
The school has strong community links and children learn in a variety
of contexts and groups including ability, co-operative and social. The
school provides a number of wider curricular activities and pupils
transition within the campus from Pre-5 to secondary education. 
9.6  Summary
People who attended the consultation had differing opinions in relation
to the closing of Minard Primary as a school, and realigning the
catchment area of Minard Primary School due to the remote nature of
the school’s location. Some wanted the school to open for their families
and become the heart of the community once again; others reluctantly
accepted that such low numbers did not make the school viable in the
future. The majority commented on the potential for the school
premises to be used as a community asset. 
The travel distance (sourced from Google maps) from Minard Primary
to Furnace Primary is 3.82 miles via the A83. Travel time is
approximately seven minutes by car. The travel arrangements have
been in place for over three years. Travel is an accepted aspect of
living in the Minard community. However one family has expressed
strongly that they are finding the travel arrangements in place for
Furnace very difficult. Other families in the Minard area have chosen to
place their children at Lochgilphead Joint Campus due to their own
work and family commitments and have made their own travel
arrangements. The travel distance (sourced from Google maps) from
Minard to Lochgilphead Joint campus is 13.13 miles via A83. Travel
time is approximately 19 minutes by car. 
This option would have no effect on the current travel arrangements of
staff. The closure of Minard Primary School, in terms of travel would
have a neutral effect on the environment.  Transport costs for pupils
are £1,482. Minard Primary School pupil numbers are not projected to
increase significantly. Furnace and Lochgilphead Joint Campus have
capacity to continue to accommodate the projected pupil numbers. 
In Furnace Primary and Lochgilphead Joint Campus children benefit
from a positive learning environments with learning and teaching which
is matched to the needs of the young people who attend each school.
In addition, there are opportunities for personal and social development
in these settings.

Page 25

25 
Taking all of the above into account, and considering how this option is
likely to successfully address the underlying reasons why the future of
Minard Primary School is being considered, this has been identified as
a reasonable option for further consideration.       
10.  OVERVIEW OF OPTIONS
Option Option Description Outcome
A Re-open Minard Primary School with the
existing catchment area
Not a reasonable option.
B Continued Mothballing of Minard Primary
School with the pupils zoned to Furnace 
Primary School.
Not a reasonable option.
C Close Minard Primary School and
realign the catchment area of Furnace
Primary School and  Lochgilphead Joint
Campus to include the current
catchment area for Minard Primary
School. 
A reasonable option. 
11.  DETAILED ANALYSIS OF REASONABLE OPTION: CLOSE
MINARD PRIMARY SCHOOL AND REALIGN THE CATCHMENT
AREA FOR FURNACE PRIMARY SCHOOL AND LOCHGILPHEAD
JOINT CAMPUS TO INCLUDE THE CURRENT MINARD
CATCHMENT AREA  
11.1 Pupil Projections 
Minard
Primary
2022/2023 2023/24 2024/25
Approved
Capacity
33 33 33 
Projected
Roll 
6 4 2 
Occupancy 18% 12% 6% 
11.2  Educational Benefits
This statement focusses on Furnace and Lochgilphead Primary
Schools, which are the schools the proposal is focused on in terms of
realigning the catchment area for Minard. Some pupils in the Minard

Page 26

26 
area have been attending Furnace Primary since it was mothballed.
Some pupils within the catchment area for Minard have always
attended Lochgilphead Primary School as placing requests, these
pupils have never attended Minard, even when it was open as the
placement suited family work commitments. 
11.2.1  Learning and Teaching at Furnace Primary
The curriculum includes a broad range of experiences
which are planned for children and young people through
their education, to help every child and young person to
develop knowledge, skills and attributes for success in
learning, life and work. 
In Furnace Primary School, children are encouraged to
be eager and active participants who are engaged,
resilient and motivated during their learning. Children
know that their views are sought, valued and acted upon.
The learning environment encourages high level of
achievement, providing a wide range of opportunities for
children to achieve their full potential within the four
contexts of learning. 
In Furnace Primary School, children may be taught in
classes composed of children from more than one year
group. Children benefit from being part of a social context
in which they can build relationships with different groups
and individuals, develop social skills, meet challenges
and exercise responsibilities as members of a social
group. 
There is a continual challenge for all schools to deliver a
school improvement agenda and deliver effectively the
principles and outcomes of curriculum for excellence. The
National Improvement Framework priorities include
raising attainment for all, and closing the gap between the
most and least disadvantaged children.   
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in
exercising the freedom and responsibility associated with
broader guidance. This means that schools are able to
design their curriculum to meet the specific needs of their
children and community. At Furnace Primary School, staff
are challenged and supported through a range of

Page 27

27 
continuous professional development and review
opportunities gained by working and learning with a range
of colleagues. These schools are also part of the Mid
Argyll Schools Cluster, supported together, moderation
and tracking of pupil progress is enabled and staff work
across stage appropriate groups. Colleagues within these
schools are able to support and challenge each other on
a daily basis. The whole staff teams are able to bring a
range of talents and skills to benefit outcomes for
learners. 
From August 2022, Furnace Primary will be part of a
shared headship with Inveraray Primary and it is
anticipated that staff and children will benefit from
working with other professionals and children from
another context. 
Furnace Primary School encourages nurturing and
positivity. One aspect of this work is a successful Buddy
System. Children from different stages work and learn
together. This vertical support is particularly evident in a
number of different planned activities when groups of
children are together in a social context. This system
develops and benefits both the ‘buddy’ and the ‘buddied’.
To implement this system there needs to be children
across a range of stages in the school. 
Furnace Primary School is a very remote rural school
(Scottish Government classification). Children from the
Minard area attending Furnace Primary would be
benefitting from the rural environment and the strengths
that a small village primary can offer. Good quality
outdoor learning is currently provided at Furnace Primary.   
11.2.2  Outcomes
Through the GIRFEC practice model, meeting the needs
of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the
opportunity to reach their potential.  Careful tracking and
monitoring procedures are in place to evidence pupil
progress. This includes professional dialogue with
teachers, learning discussions with children, classroom
observations, assessment and looking at pupil work.
Planning for Progress meetings are being further

Page 28

28 
strengthened. These discussions between home and
school improve parental engagement whilst focussing on
next steps for learning. Where appropriate, intervention is
put in place, while working effectively with other agencies
and parents to ensure the needs of each child are met. 
In the primary classes, standards of attainment have
been maintained over the last three years. Most children
are achieving national expectations in reading, writing,
listening, talking and numeracy. All of the schools in Mid
Argyll continue to develop within the PATHS program
supporting positive behaviours and relationship within the
school.  A larger staff, parent body and partner group by
nature increases the breadth of talent and interest that
may be available to share within a school setting. This
applies both in terms of the wider curriculum and within
aspects of the curriculum that may be enhanced by staff
individual expertise e.g. PE, language, science,
expressive arts teaching. 
11.2.3  Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned
experiences which help them develop the knowledge and
understanding, skills, capabilities and attributes which
they need for their mental, emotional, social and physical
wellbeing both now and in the future.   
11.2.4  Environment for Learning
Furnace Primary is a suitably-equipped and well
supported school, situated in the heart of the community.
The building is well maintained and provide a fit for
purpose accommodation for primary aged children.  The
school has access to outdoor areas that support pupil
learning and wellbeing.  The building has facilities for
pupils and visitors with special access needs. 
11.3  Assessment of Rural Factors – Furnace Primary
The reasons why the future of Minard Primary School is being
reviewed are stated at Section 2 of this report. There is currently no
expectation for the pupil numbers to increase at the School. Minard
Primary School is mothballed with no current pupils. Having considered
all the alternatives above, the option to close Minard Primary School
and realign the catchment area for Furnace Primary School and
Lochgilphead Primary School respectively to include the former Minard

Page 29

29 
Primary School catchment area is considered the most reasonable
means to address the reasons identified at Section 2 of this report. 
11.3.1  Community Impact
The community offered differing views on the proposed
closure of the school. There was a suggestion that should
the school close, the building and adjoining grounds
could potentially be retained for community use. There
was a view from some community members that a local
school would attract new families to the area. Within
Minard there is a Village Hall which houses community
events. All people who attended the Options Appraisal
Meeting strongly stated the school building should be
retained for community use and not allowed to fall in to
further disrepair, as that would adversely impact on the
community’s access to the premises and the visual
impact of the village. It is accepted that a school closure
may have an adverse effect on a community, but a
vibrant community hub could be an asset to the
community. The school premises are situated within
walking distance of the village. Formal closure of the
school would mean that plans for the future of the
building could potentially be progressed by the
community. 
11.3.2  Travel Arrangements
The travel distance (sourced from Google maps) from
Minard Primary to Furnace Primary is 3.82 miles via the
A83. Travel time is approximately seven minutes by car.
The travel arrangements have been in place for more
than three years. This option will have no impact on staff
travel. Travel is an accepted aspect of living in the Minard
community. However one family has expressed strongly
that they are finding the travel arrangements in place for
Furnace very difficult.  Transport costs for pupils to
Furnace Primary are £1,482. 
The closure of Minard Primary School, in terms of travel
would have a neutral effect on the environment.   
11.4    Learning and Teaching at Lochgilphead Joint Campus
The curriculum includes a broad range of experiences
which are planned for children and young people through
their education, to help every child and young person to

Page 30

30 
develop knowledge, skills and attributes for success in
learning, life and work. 
In Lochgilphead Joint Campus, children are encouraged
to be eager and active participants who are engaged,
resilient and motivated during their learning. Children
know that their views are sought, valued and acted upon.
The learning environment encourages high level of
achievement, providing a wide range of opportunities for
children to achieve their full potential within the four
contexts of learning. 
Children are taught in single year groups and there is a
wide range of expertise within a larger staff team. The
school has strong community links and children learn in a
variety of contexts and groups including ability, co-
operative and social. The school provides a number of
wider curricular activities and pupils transition within the
campus from Pre-5 to secondary education. 
There is a continual challenge for all schools to deliver a
school improvement agenda and deliver effectively the
principles and outcomes of curriculum for excellence. The
National Improvement Framework priorities include
raising attainment for all, and closing the gap between the
most and least disadvantaged children.   
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in
exercising the freedom and responsibility associated with
broader guidance. This means that schools are able to
design their curriculum to meet the specific needs of their
children and community. At Lochgilphead Joint Campus,
staff are challenged and supported through a range of
continuous professional development and review
opportunities gained by working and learning with a range
of colleagues. These schools are also part of the Mid
Argyll Schools Cluster, supported together, moderation
and tracking of pupil progress is enabled and staff work
across stage appropriate groups. Colleagues within these
schools are able to support and challenge each other on
a daily basis. The whole staff teams are able to bring a
range of talents and skills to benefit outcomes for
learners.

Page 31

31 
Lochgilphead is a remote rural school (Scottish
Government classification). Lochgilphead Joint Campus
has a welcoming and inclusive ethos of celebrating pupil
achievement and prides itself in being big enough to offer
a breadth of experience for pupils but small enough to
strive to meet the needs of all pupils. 
The co-location of the nursery and the primary classes at
Lochgilphead Joint Campus enhance the transition
process for children moving from Nursery in to Primary
one, through joint educational processes and liaison
between the two settings. 
11.4.2  Outcomes
Through the GIRFEC practice model, meeting the needs
of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the
opportunity to reach their potential.  Careful tracking and
monitoring procedures are in place to evidence pupil
progress. This includes professional dialogue with
teachers, learning discussions with children, classroom
observations, assessment and looking at pupil work.
Planning for Progress meetings are being further
strengthened. These discussions between home and
school improve parental engagement whilst focussing on
next steps for learning. Where appropriate, intervention is
put in place, while working effectively with other agencies
and parents to ensure the needs of each child are met. 
In the primary classes, standards of attainment have
been maintained over the last three years. Most children
are achieving national expectations in reading, writing,
listening, talking and numeracy. All of the schools in Mid
Argyll continue to develop within the PATHS program
supporting positive behaviours and relationship within the
school.  A larger staff, parent body and partner group by
nature increases the breadth of talent and interest that
may be available to share within a school setting. This
applies both in terms of the wider curriculum and within
aspects of the curriculum that may be enhanced by staff
individual expertise e.g. PE, language, science,
expressive arts teaching.

Page 32

32 
11.4.3  Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned
experiences which help them develop the knowledge and
understanding, skills, capabilities and attributes which
they need for their mental, emotional, social and physical
wellbeing both now and in the future.   
11.4.4  Environment for Learning
Lochgilphead Joint Campus is a suitably-equipped and
well supported school, situated in the heart of the
community. The building is well maintained and provide a
fit for purpose accommodation for primary aged children. 
The school has access to outdoor areas that support
pupil learning and wellbeing.  The building has facilities
for pupils and visitors with special access needs. 
11.5  Assessment of Rural Factors – Lochgilphead 
The reasons why the future of Minard Primary School is being
reviewed are stated at Section 2 of this report. There is currently no
expectation for the pupil numbers to increase at the School. Minard
Primary School is mothballed with no current pupils. Having considered
all the alternatives above, the option to close Minard Primary School
and realign the catchment area for Lochgilphead to include a portion of
the current Minard Primary School catchment area is considered the
most reasonable means to address the reasons identified at Section 2
of this report. 
11.5.1  Community Impact
The community offered differing views on the proposed
closure of the school. There was a suggestion that should
the school close, the building and adjoining grounds
could potentially be retained for community use. There
was a view from some community members that a local
school would attract new families to the area. Within
Minard there is a Village Hall which houses community
events. All people who attended the Options Appraisal
Meeting strongly stated the school building should be
retained for community use and not allowed to fall in to
further disrepair, as that would adversely impact on the
community’s access to the premises and the visual
impact of the village. It is accepted that a school closure
may have an adverse effect on a community, but a
vibrant community hub could be an asset to the
community. The school premises are situated within

Page 33

33 
walking distance of the village. Formal closure of the
school would mean that plans for the future of the
building could potentially be progressed by the
community. 
11.5.2  Travel Arrangements
Some families in the Minard area have chosen to place
their children at Lochgilphead Joint Campus due to their
own work and family commitments and have made their
own travel arrangements, before Minard Primary was
mothballed. The travel distance (sourced from Google
maps) from Minard to Lochgilphead Joint campus is
13.13 miles via A83. Travel time is approximately 19
minutes by car. This option would have no effect on the
current travel arrangements of staff. There would be no
additional travel costs for children attending Lochgilphead
Joint Campus as there is capacity in the system. 
The closure of Minard Primary School, in terms of travel
would have a neutral effect on the environment.   
11.6  Financial Impact
The main elements included within a school budget are Teacher
employment costs (ie basic salary costs plus related employer’s
National Insurance and Superannuation contributions plus any relevant
individual allowances); Local Government employee costs and an
allocation for discretionary expenditure incurred by the school (i.e.
educational equipment, materials, staff travel, etc.).  Teacher staffing
budgets are calculated on an annual basis and within the Primary
sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific
number and age of the pupils in each school.  When a school ceases
to be operational the Teacher staffing budget is adjusted (at the
appropriate time), per entitlement information from Education HR, with
the staffing budget resulting in a nil value.  As a result of the authority’s
policy for no Teacher redundancies it is presumed that the staff are
deployed elsewhere within the authority and therefore their salary costs
still exist with an increase to the receiving school’s budget.  This is also
in line with the national priority of maintaining teacher numbers.  This
methodology also applies to the school’s discretionary budget which
again is formula based.  The budget of the receiving school, in terms of
any pupils being transferred, will have increased.  The figures outlined

Page 34

34 
below take account of the fact that the staffing and discretionary
budgets have been adjusted to nil. 
The annual running costs during mothballing of Minard Primary School
are a total of £8,956. 
Annual savings generated through closing Minard Primary School
would be £8,956. 
The costs/savings outlined above assumes all revenue expenditure
would cease. This includes non-domestic rates, utility costs,
insurances, etc.  If the school was to be formally closed, this would
allow the council to take steps towards selling the school to a third
party or local community. 
11.5  Environmental Impact
Currently pupils travel to Furnace Primary and Lochgilphead Joint
Campus. However this option would have a neutral environmental
impact on the current position and would have no impact on the current
travel arrangements for staff and pupils. Families travelling to
Lochgilphead Joint Campus do so for work and family commitments,
and would continue to do so, even if Furnace Primary were to re-open.
Travel is an accepted aspect of rural life. 
12.  CONCLUSION
Three alternative options have been reviewed in considering the future
of Minard Primary School.  For each option, information was collated
and consideration was given to:
 Community feedback;
 Pupil numbers; 
 Financial Information;
 Assessment of rural factors, including community impact, economic
impact and travel arrangements, and
 Educational Benefits.
An authority that is contemplating a rural school closure proposal must
satisfy the preliminary requirements set out in Section 12A of the 2010
Act before formulating a proposal. 
After consideration of the preliminary requirements, as set out in the
Act, and the options, and having regard to the specific reasons
identified at Section 2 of this report, closing Minard Primary School and
realigning the catchment area to Furnace Primary School and
Lochgilphead Joint Campus is the most reasonable option for
consideration.

Page 35

35 
It is recommended that the Community Services Committee:
a. Note the outcome of this consideration of the preliminary
requirements; and,
b. Agree that officers now formulate a draft proposal that will come
back to the June 2023 meeting of the Committee for approval by
members which would subsequently trigger the formal
consultation process under the Schools (Consultation)
(Scotland) Act 2010. 
Appendix 1 Local Develop Plan for Minard 
H3023
198000
198000
199000
199000
6
9
6
0
0
0
6
9
6
0
0
0
6
9
7
0
0
0
6
9
7
0
0
0
6
9
8
0
0
0
6
9
8
0
0
0
© Crown copyright and database rights 2019.  Ordnance Survey Licence number 100023368 0 100 200 300 400 500 metres
1:12,500 Scale at A4 - 
Argyll and Bute Proposed Local Development Plan 2
Map Number 117 
Minard and Crarae Point

Page 36

36 
Appendix 2 Local Development Plan for Furnace 
°
M30
02
2010
00
2010
00
2020
00
2020
00
2030
00
2030
00
70
00
00
70
00
00
© Crown copyright and database
rights 2019.  Ordnance Survey Licence number
100023368 0 10
0
20
0
30
0
40
0 metr
es 1:10,0
00
Scale at
A4 - 
Argyll and Bute Proposed Local
Development Plan 2  
Furnace and Sandhole

Page 37

37 
°
P300
8
P301
6
P300
9
H300
6
H300
2 H300
5
H303
0
H301
4
A301
5
18600
0
18600
0
18700
0
18700
0
6
8
8
0
0
0
6
8
8
0
0
0
6
8
9
0
0
0
6
8
9
0
0
0
© Crown copyright and database
rights 2019.  Ordnance Survey Licence number
100023368 0 10
0
20
0
30
0
40
0 metre
s 1:10,0
00
Scale at
A4 - 
Argyll and Bute Proposed LDP2 
Lochgilphead North
Appendix 3 Local Development Plans for Lochgilphead

Page 38

38

Page 39

39 
Appendix 4 Key for Local Development Plans

Page 40

40 
Appendix 5 Minard Primary Floor Plan

Page 41

41 
Appendix 6 Lochgilphead Joint Campus Floor Plan

Page 42

42

Page 43

43 
Appendix 7 Furnace Floor Plan

Page 44

44 
Appendix 8 Notes from Community Consultation Day 
Minard Community Consultation     26TH May 2022
19 people attended through the day
Some have also responded by email. 
General responses 
Wrap around care featured….
I feel there are limited efforts to keep Minard PS open. Argyll and Bute have
not committed to the wrap around care that would make it viable. There used
to be after school care in Furnace that was also used by Minard families.
When it closed, it also had an impact on Minard.
The council have made a conscious choice not to support wrap around care
to help to close schools.
When the school was open, we had an after school club. Would parents take
ownership of this? Help with before and after school care? It might suit
parents better who are now working from home. 
Wrap around care is important for a school in this location and context. 
The school was at the heart of the community
It’s more than just a school.
This was a vibrant school at the heart of the community. When my children
came here – there were 30 children here. Those children have gone on to be
very successful. They also have a community minded approach to life.
Children gain so much from the community that is valuable. How can that be
provided by a bigger community? When the children were here, they would
feel the support from the other members of the community.
This was the hub for the community.
There was a great feeling around the school. 
As a former parent, we would never have moved here without the school
being open. The shop, the post office, church – the school is so important –
without a school the village is dead. This was a marvellous school, the village
was buzzing. The school was the life of the village/community – it was vibrant
– with Easter celebrations, Christmas and the local community would offer
support.
I have been part of the community for 40 years and my children attended the
school and hold very responsible positions with the Scottish Government and
Strathclyde University. I was involved in the school, I find it so sad as it was
the centre of the community. 
There was such a pride in the school – with different activities, including
coffee mornings – the whole community supported the children in many ways. 
When you have an education in a school like this, it stays with you. 
General comments 
I can’t say either way without more information.
This affects the long term future of communities that are between Inveraray
and Lochgilphead.

Page 45

45 
If you are transported to another town to go to school, you lose your
connection with your home community.
ABC needs to take care because of how previous proposed closures were
managed. This needs compassion. 
Children end up not having freedom to play with friends without being
transported. For children from low income families, this impacts more. The
cost of living is real.
Having the school closed has impacted on the connections or lack of that
young families have. Covid activities in the community illustrated this as
activities for kids was organised by older families. 
The community used to be based around so much many of the school
activities.
The use of the building and grounds would need to be for the community,
should the school close.
Concern that if the school were to close, it would end up as an Airbnb or anti-
social neighbours.
The actions of the council are out of line with what they are saying about
retaining schools therefore there is a lack of trust. 
We need to look at all the facts and we don’t have these. Maybe we need an
independent mediator to help facilitate discussion.
x2 Would encourage a decision to be made about the future of the building
and grounds sooner rather than later. 
Social belonging is important but is it to be expected from education? 
This is a reflection of how life is now in a rural area – you need to commute
out of the village for work and services. 
I don’t feel I have enough information around the health and wellbeing impact
on pupils. 
Empty houses for holiday lets – the community could be gone and this is a
ghost town. 
This affects the local church too.
Within the locality, it is holiday homes around here. Are there 10 affordable
houses meant to be built? 
I am torn between the personal and the professional outlook – if my wee one
was to come here – socially - what would I want?
What we need are more children within the area.
Families who have already settled will stay in other schools as they will be
established. We would need more children to have enough in a co-hort. 
We need the community to thrive and numbers to go up for the school to be
viable. The social side – could the school provide this? 
All it takes is for some local families to move into the area. 
The Community Council held a meeting regarding the school previously – 4
adults turned up.
Amenities have reduced considerably in the village – what is there for young
families? Recently young families have stepped up and kept it alive but sadly
the writing is on the wall.
House prices in the area are so high – ACA? Indeed, across Argyll.
Housing is an issue in the area. 
This could become a ‘ghost village’, with second houses.

Page 46

46 
Such a shame about the building – not easy. 
Understand what families are doing at the moment - it is convenient for them
to have their children attend other schools. 
It would be perfect to open the school again but realistically we know it is hard
– but there is a danger this will become a retirement village. 
The recent Transformation plans from the education department – gives me
concerns for the future. 
We need to make the area attractive for families in the future. 
Affordable housing in the area is an issue. What is affordable for families?
Employment is also an issue. 
We know staffing is an issue – but can we look at accommodation for
members of staff to attract them to the area? 
When travelling to another school, the LA should provide a school bus, rather
than a public bus. 
There are young families in the village – children are the lifeblood, we have
children and grandchildren locally. 
I understand parents wanting to go elsewhere to education their children – is it
linked with after school care? 
There are retired people here and the age demographic is older. 
The local economy 
Not having a school impacts on the local economy.
No school resulted in no shop.
When we lost the shop, it was hard. 
Toddler group
There is a toddler group starting to encourage family participation in the area.
This is split between Furnace and Minard. 
There is a Parent and Toddler group (13 max) attending, with 6-8 regular
attenders – we work between Minard and Furnace and the parents like this. 
There have been incidents with the alarm going off.
The building itself
The Community Trust was a tenant in the front room of the school house. It is
still a tenant but ‘stuff’ moved out. CT on space at front. 
Would like to see it used for a purpose for young people regardless. The
building needs investment. 
What affect has the mothballing had on you, your family, the
community? 
Mothballing the school has had a huge impact on community cohesion.
Families have been forced into going elsewhere and now they don’t know
what they are missing. 
No focal point left for the village.
I feel really sad about it – my kids did really well out of the school. 
Mothballing has forced community conversations around how the school
could be better used. 
I think it should continue to be mothballed as we don’t know what people’s
lifestyles are going to be in the next 5 years, into the post-pandemic world.
The school connected (and was at the centre of) the community. It gave us a
focus.

Page 47

47 
It’s not being an asset to the community at the moment. 
Need to accept that families are now looking to seek wider friendships for their
family. 
This was a vibrant school that was part of our community. 
The school delivered a high quality education.
The children gained great democratic community skills. 
Views on continuing with the mothballing 
How will continuing to mothball the school increase numbers? 
Should we continue to mothball to see how post-pandemic living impacts on
choices open to parents? The increase in home working could make the local
school more viable?
Could the school be used by the community in a more productive way whilst
mothballed? 
Views on re-opening the school with existing catchment
There needs to be sufficient numbers of children in the school so that a child
is not there on their own.
Children in small schools learn so well from each other. 
It would be interesting to know post pandemic the projected numbers for
pupils.
It would be great to involve the community through events that used to be led
from the school. 
The environmental impact and cost of living should be considered. 
There are very young children in the area, coming up. 
Unless you know there is potential to send a child to a local school, you are
not going to use it.
There are not any children to make it viable at the moment. 
I know that in order for it to be viable we need more children. I would like the
school to open with larger catchment area but there needs to be a demand. It
is hard for families to juggle – wrap around care could be an issue. 
Why has this happened? I find this very upsetting to look at the school like this
– I know there are not a lot of children in the village but could the school be
used for adult purposes too? 
Children would benefit from walking locally to school rather than going in the
car. 
We have more young children already in our area that have recently arrived
who could benefit from local education in the village. 
If folk know if there is a school in the village area – it may attract more people
here – there were only ever good reports about the school and former pupils
should be able to access the school. The village needs new life rather than
the older demographic – we need to attract new younger members of the
community. 
The school offers a fantastic context for learning about nature – children need
to be learning outdoors – it’s not just about learning in the classroom. 
The facilities and resources are already here to open – this could save
money.

Page 48

48 
Views on closing the school
You lose culture when you lose a small school.
Concern that this will have further impact on the local community and the
economy.
It is difficult to motivate pupils in small groups. 
Not enough children in the locality for the school to be opened as an
educational establishment. 
The school logbook show how much quality work was done in the school –
but numbers need to be healthy – numbers below 9 means it is hard to
motivate children.
We have no need for a school. 
There are positives and negatives around a small school and a big school.
Quality of leadership is a factor and lack of staff is also an issue. 
Re-open the school but widen the catchment area
It would be competing with Furnace PS.
X2 You would need wrap around care. 
The toddler group has shown that there may be a demand for the school
through this group.
When the school was here, there was placing requests from outwith the area. 
There doesn’t appear to be the same commitment/flexibility within
communities to support one another with wrap around care. 
Parents need to want to support their own local schools. 
It’s harder to get a community feel in a large school. 
We are a young family and we work from home – it would be so convenient
for us to have the school open. 
We have a two year old and this is a strong community – there is no
park/social space for children to meet/socialise (other than the school) – the
school would be a great hub for them. I like the idea of small classes
compared to larger classes – get more 1 to 1 focus on pupils. The ‘friend base
in one place ie the school helps in the transition to High School. 
As a young parent, I am unsure about transporting young children to another
school. Our travel and work commitments are an issue if the school does not
re-open.
Social and belonging skills can be fostered. 
With my experience in Pupil Support, I would reflect that a small school can
offer a great deal for pupils with ASN. The distance between Lochgilphead
and Inveraray us considerable for young children. Pupils thrive in small
schools – there are some children who can’t cope in bigger schools. With the
nurture agenda – it’s what small schools provide. Some pupils have
transferred to here – they could not cope elsewhere and they flourished. My
heart says open the school and widen the catchment area, but my head
knows it is unsustainable. The school grounds are fantastic for learning. 
This is a fantastic resource. 
Children need to come first – this should be used as education as its sole
purpose. Need to bring in as a village young children and families, without
them we will lose buses, shops, businesses.

Page 49

49 
Mum’s need to be at the gate – it is about supporting them as much as
supporting the children. 
I feel this is such a waste of a beautiful building. Why keep Furnace open and
close here? Why not open here and close Furnace if their numbers are going
down? 
To open the school would bring more life to the village and encourage young
families into the area. 
Future use of the building/grounds
X5  Could it be used as an outdoorcentre,
Leisure/hostel/cycling/sailing/kayaks/archery etc locals and visitors could
access?
X 3 Could this be a Pre-5 centre? Nursery? 
Could this be used for Forest schools?
Could this be a 1 to 1 support place for children with learning disabilities? 
Could the school be used as a creative space/possible art hub?
Or a drop in medical centre – appointments for those who have mobility or
transport issues?
A health retreat? 
Fetes could be held.
Could be used as a bookable office or meeting space? 
Could the school house be let out to help finance the use of the school for the
above mentioned? 
Post COVID – would this be used differently as a building?
The building needs life but perhaps in a different purpose?
A hub to support those with addiction problems? 
Would parents re-consider school placements if this was on their doorstep/in
their immediate community? 
Uncertainty around the building and the grounds. Would the building and
ground revert back to the community? 
Issues with access. Concern over scale or any development. Does
infrastructure support this? Parking, etc? 
Could development create a population with more children without a school to
deliver the education service? 
Could the grounds be used for a community garden? 
Could the school be a community hub for adult education or educational
purposes? The last two years have been tough – it has had a lot of impact on
the mental health of everyone. 
The community would benefit from it being used on a commercial basis.
Use as a hub/café/current community use? 
X2 Needs to be used to its full potential/strengths
Community would benefit from use as a business or linked to education. 
So sad to see this – the building needs investing in. 
The school would make an amazing conversion into a home.
I believe there could possibly be 19 children attending the school in the future.
This would support a network for young families.
What happens for families living locally who do not have a car?

Page 50

50 
The longer the building is left, it is going to be open to vandalism and
squatters. The building has a heritage that we cannot lose. 
What is it going to turn into? The Lloyd family had gifted to Argyll and Bute.
Would like the community to pull together to consider buying the building. 
Questions raised 
What are the financial implications? 
What infrastructure is being put in place to support/encourage young families
into the area?
What is the overall plan for the future proofing of the area to join up housing
etc? 
Is it the responsibility for education to provide that sense of belonging? 
Is there an argument for the school to be used while mothballed? 
What are the plans for the building? 
Information provided
Local residents also provided Education representatives with information
about the ownership of the building and also thoughts on the accuracy of
numbers of children in the area. 
H3023 198000 198000 199000 199000 696000 696000 697000 697000 698000 698000 © Crown
copyright and
database
rights 2019. 
Ordnance
Survey
Licence
number
100023368
0 100 200 300 400 500 metres 1:12,500 Scale at A4
-          
Argyll
and Bute
Proposed
Local
Developme
nt Plan 2
Map
Number
117 
Minard
and
Crarae
Point
H3023 198000 198000 199000 199000 696000 696000 697000 697000 698000 698000 © Crown
copyright and
database
rights 2019. 
Ordnance
Survey
Licence
number
100023368
0 100 200 300 400 500 metres 1:12,500 Scale at A4
-          
Argyll
and Bute
Proposed
Local
Developme
nt Plan 2
Map
Number
117 
Minard
and
Crarae
Point °
M3002 201000 201000 202000 202000 203000 203000 700000 700000 © Crown
copyright
and
database
rights 2019. 
Ordnance
Survey
Licence
number
100023368
0 100 200 300 400 metres 1:10,000 Scale at A4
-  Argyll
and
Bute
Propose
d Local
Develop
ment
Plan 2
Map
Numb
er 93