Democracy Spraffa

Item 19 Appendix 01

West Dunbartonshire Council · 20 December 2023
Back to West Dunbartonshire Council — 20 December 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Annual
Performance
Report
2022/2023
www.wdhscp.org.uk
APPENDIX 1

Page 2

Contents
Foreword                                                            
Summary                                                           
Introduction                                                           
Overview of the HSCP                                         
Aims of the Annual Performance Report         
Policy Context                                                   
National Performance Measurement               
Performance Against Strategic Priorities           
 
 
Priority 1: Early Intervention                           
 
 
Priority 2: Access 
 
 
Priority 3: Resilience   
 
 
Priority 4: Assets
 
 
Priority 5: Inequalities
Best Value and Financial Performance
Good Governance
Appendix 1: Core Integration Indicators
Appendix 2: Local Government Benchmarking Framework
Appendix 3: Ministerial Steering Group Performance
Appendix 4: Strategic Plan Key Performance Indicators
Appendix 5: Care Inspectorate Grades 2022/23
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2
3
8
8
10
10
15
19
20
32
41
44
48
60
65
67
68
69
71
74
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 1

Page 3

Foreword
Beth Culshaw
Chief Officer
Welcome to West Dunbartonshire Health and Social Care Partnership's (HSCP) 2022/23 Annual
Performance Report. The report summarises the progress made by the HSCP over the past year.
 
The last three years have been extremely challenging, but in many ways exceptionally rewarding,
with staff and communities going above and beyond to care for service users and each other during
one of the most challenging periods in recent history.   Public sector funding struggles to keep pace
with rising costs and our demographic pressures, meanwhile it is clear that the full impact of the
pandemic will take many years to reveal itself.
 
In the last year we continued to be humbled by the endeavours of our health and social care
workforce and are extremely grateful to our communities, especially those unpaid carers, who have
worked with us under difficult circumstances to respond to a variety of challenges.
 
This report is set in a context of additional demand on finite resources.   Existing core budgets are
already under significant pressure but the challenges we face present the opportunity to do things
differently – to make optimal use of the resources we have and create a health and care system that
more effectively utilises existing strength in our efforts to better meet the needs and promote the
health and wellbeing of our communities.
 
The Integration Joint Board continues to be ambitious for our communities and our key focus remains
the furtherance of integrated services by increasing access to community based health and social care
services, shifting the balance of care from hospital to more homely settings and supporting our most
vulnerable residents to lead healthy, happy and fulfilling lives.
 
This Annual Performance Report aims to detail the progress the Integration Joint Board has made in
realising the aims of integration whilst highlighting examples of good practice which have been
achieved within the current legislative framework.  We remain committed to continuing this
conversation with the Scottish Government to exemplify what can be achieved when the principles of
integration are fully embedded.
In closing I would like to extend my personal thanks and those of the Senior Management Team to
our staff who have worked tirelessly over the last year to provide vital services and support to the
people of West Dunbartonshire.
2
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023

Page 4

Summary
Purpose of Report
Key Achievements 2022/23
Priority 1: Early Intervention
This annual performance report outlines West Dunbartonshire Health and Social Care Partnership's
performance in relation to national and local priorities during the period 1st April 2022 to 31st
March 2023.  It will describe progress against the key strategic priorities outlined in our Strategic
Plan 2019-2022 and will seek to demonstrate our commitment to Best Value in the commissioning
and delivery of services.
During 2022/23 West Dunbartonshire Health and Social Care Partnership (HSCP) made significant
progress against the key strategic priorities outlined in our Strategic Plan 2019-2022: early
intervention; access; resilience; assets; and inequalities. 
MMR1 vaccinations for children aged 24 months above the Scotland figure of 93.9% at 94.4% and
immunisation rates higher than those for the Health Board and Scotland for all immunisations at
24 months and for 4 out of 5 immunisations for children aged 5 years.
Development work on a West Dunbartonshire Wellbeing website inspired and co-produced
through engagement with young people from West Dunbartonshire secondary schools.
Distress Brief Intervention training offered to over 175 frontline workers and online training 
completed by 90 local partners who can make referrals to the Distress Brief Intervention Service.
West Dunbartonshire invited to become the fifth national pilot site to offer Distress Brief
Intervention to 14 and 15 year-olds.
90 parents and carers of young people completed support and education sessions following a
diagnosis of a child or young person with neurodiverse issues such as autism.
Training courses completed by the Disability Sports Youth Group on Disability Sports Awareness,
Coaching Footballers with a Disability, Managing Finances, First Aid, and Child Protection.
77.5% of people aged 65 and over who have had 2 or more emergency admissions to hospital in
the last year have had an assessment of their needs.
Emergency admissions for people aged 18 and over below our local target of 9,180 at 8,625.
Rate of emergency admissions for people aged 65 and over of 268.1 per 1,000 population, below
our target of 271.
1,129 people have received support with their medication from our Homecare Pharmacy Team.
1,942 people were receiving a Community Alarm/Telecare service at March 2023.
95% take up of 27-30 month reviews for those children of eligible age: higher than the Scotland
or NHS Greater Glasgow and Clyde figures, and second highest take up across the 6 HSCPs within
Greater Glasgow and Clyde. 
Just under 94% of referrals to addiction services, including third sector partners, starting
treatment within the national target time of 3 weeks, exceeding the 90% standard.
19,817 people had an Electronic Key Information Summary (eKIS) in place to allow for sharing of
key information across the HSCP, hospital Acute Services and Primary Care.
Development of, and extensive consultation on, a new HSCP Strategic Plan for the period 2023-
2026 reflecting stakeholder priorities and identifying the challenges as well as the opportunities
to deliver our strategic outcomes.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 3

Page 5

99.1% of children and young people referred to Child and Adolescent Mental Health Services
starting treatment within 18 weeks of referral, above the national target of 90%.  The average
wait for treatment was 9 weeks.
58 people participated in a Resilience Hub online meeting themed on 'Developing your Trauma-
informed Practice' showcasing the range of free training resources available from the National
Trauma Training Programme as well as how some local teams within Education and Blairvadach
Children's House have put this into practice.
40 leaders attending the national Scottish Trauma-informed Leadership Training.
1,280 people in total have now seen the Resilience film with the latest viewers being foster
carers, kinship carers and adoptive parents in March 2023.
4,456 referrals to Adult and Older People Mental Health Services and 29,895 appointments
offered.
Recruitment completed for Wellbeing Nurses within all GP practices across West Dunbartonshire.
Successful recruitment to and roll out of a new Specialist Physical Health Nurse service based
within Community Mental Health Teams and a Mentalisation Based Therapy Nursing Service for
people with emotionally unstable personality disorders.  The latter has reduced the number of
admissions to both the Mental Health Crisis Team and Mental Health inpatient services. 
Development and introduction of an HSCP Adult Support and Protection Duty system and Area
Resource Group.
Mental Health Social Workers have ensured all clients have an established review date using
principles of self-directed support to ensure all care packages meet the eligibility criteria for adult
social care services. 
Staff and volunteers through the HSCP's Work Connect Employment service supported the Vale of
Leven Hospital to open their Dementia Friendly Garden for patients and their carers.
Priority 3: Resilience
Appointment of a Self-Directed Support (SDS) Lead in June 2022 to drive forward improvement
work. 
Update and release of an SDS ilearn module in October 2022.
Twice weekly SDS Clinics for one to one coaching around any aspect of SDS. 
10,386 hours of homecare delivered to 1,416 West Dunbartonshire residents as at March 2023 to
support them to live as independently as possible in their own homes.
71% of people on the Palliative Care Register supported to die at home or in a homely setting for
cancer deaths and 62% for those patients with a non-cancer death.
Introduction of a new Adult Carer Assessment and Support Plan, eligibility criteria for adult
carers and a new process for how newly identified adult carers can access different support. 
£50,000 allocated by the HSCP to Carers of West Dunbartonshire to be accessed by carers for
Short Breaks via Carers of West Dunbartonshire's Out of the Blue Service.
Collaborative work across the 6 HSCPs within Greater Glasgow and Clyde to develop and deliver
services to people with learning disabilities and very complex support needs.
827 Justice Social Work Reports completed, an increase of 4% on 2021/22.
84.2% of people with a Community Payback Order attending an induction session within 5
working days of sentence.
15 individuals supported by a new Bail Assessment and Supervision Service which commenced at
Dumbarton Sheriff Court in September 2022.
Diversion services provided to 37 people who had not been convicted of an offence, supporting
them not to become further entrenched in the justice system.
Close working between Justice and Housing Services to ensure short stay accommodation is
identified for individuals prior to release and support then provided to access a permanent
tenancy.
Enhancement of unpaid work service by ensuring that tasks are meaningful to communities and
provide learning opportunities for service users, including improving the environment and
supporting charitable and voluntary organisations.
Priority 2: Access
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 4

Page 6

Priority 5: Inequalities
88.7% of looked after children being looked after in the community helping them maintain
relationships and community links.
86.2% of children from a black or minority ethnic community who are looked after, are looked
after in the community.
The Promise Lead Officer recruited in May 2022.  Engagement sessions reached over 300 people.
Viewpoint relaunched in July 2022 with over 70 social workers attending training.
West Dunbartonshire Champions Board re-launched in collaboration with Y-Sort It and Who
Cares Scotland?
Free training provided by Each and Every Child to over 80 multi-agency staff offering support
around language and care experience to reduce stigma.
130 young people supported by the HSCP's Throughcare and Aftercare team during 2022/23.
New ways of supporting unaccompanied asylum seeking children developed including a housing
support model and working directly with the Home Office to ensure identified children who will
be travelling to Scotland as part of the National Transfer Scheme are fully supported with this
transition.
Leadership training for equality and inclusion and a session on the Fairer Scotland Duty from the
Improvement Service provided to the HSCP's extended management team.
Addiction Services piloted a project on same day medication assisted treatment in Clydebank. 
Changes made to the service via the pilot led to an 85% reduction in service access delays and a
65% increase in the number of people accessing treatment.
Additional funding provided to a third sector partner addiction service to support in the delivery
of a family support service.
Development of a Recovery Community and Lived and Living Experience Panel.
Whole System Approach to Rights-Based, REACH advocacy workshops delivered to over 300
individuals within statutory and non-statutory services as well as community members.
Recruitment of 2 dedicated advocacy workers for Addiction Services.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 5
Priority 4: Assets
Prescribing costs per patient lower than the NHS Greater Glasgow and Clyde figure of £187.73 at
£185.96.
Staff wellbeing webinars made available to all HSCP staff by West Dunbartonshire Council
including emotional resilience, communication and neurodiversity. 
The extension of Mental Health First Aiders who work alongside Wellbeing Advocates to signpost
employees to supports and provide important feedback from employees on wellbeing needs and
initiatives. 
Work  commenced in relation to the Equally Safe at Work programme to raise awareness and
understanding of gender-based violence. 
NHS Greater Glasgow and Clyde have made progress across the pillars within the Staff Health
Strategy and have continued to develop and implement the health and safety culture framework.
Conversion Rate of 83% in January - March 2023 for the proportion of children where the Child
Protection Case Conference decision is to add the child to the Child Protection Register.  This
Conversion Rate is a good indicator of the effectiveness of our processes and decision-making.  
The rate was 65% in the same period in 2022.
More effective collection of Inter-Agency Referral Discussion data identified through scrutiny of
the Child Protection Minimum Dataset and Police Scotland data now being shared with the HSCP.
Revised model of initial response or 'duty' service has been developed by Children's Services,
benchmarked against current service uptake of new referrals to the service.
Work undertaken with the Scottish Children’s Reporters Administration to support better
management of the high volume of report requests, specifically developing a triage process to
support decision making where a full report may no longer be required.

Page 7

Overview of the HSCP
West Dunbartonshire
Health and Social Care
Partnership formally
established 1st July 2015
2022/23 budget of
£228 million
Employing 2,298 health
and social care staff
across Adult, Children's
and Criminal Justice
services (1,842 FTE)
Delivering health and
social care services to
support the people of
West Dunbartonshire:
population 87,790
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 6

Page 8

Challenges and Areas for Improvement
West Dunbartonshire's overall population is in decline however the proportion of older people within
the authority is steadily increasing.  From 2018-based population estimates it is predicted that the
pensionable age and over population will increase by 15.2% by 2033 and the over 75 population will
increase by 34%.  People are living longer with more complex health needs and therefore may require
more input from health and social care services.
West Dunbartonshire is an area of high deprivation and the impact of the current cost of living crisis,
with significant hikes in fuel prices, inflation and the cost of providing services across all sectors and
businesses, is likely to be felt more acutely than in other less deprived areas.  In addition, while the
worst of the Covid-19 pandemic may now be behind us, our communities have had little time to
recover from its impact and the longer term impacts are still unfolding.
Specific challenges faced during 2022/23 were:
National challenges around delayed discharges from hospital were particularly significant in West
Dunbartonshire with delays reaching unprecedented levels. West Dunbartonshire has a dedicated
hospital discharge team, which comprises of 22.9 whole time equivalent posts with currently 2.5
whole time equivalent social worker vacant posts  Hospital dischange sits within Health and
Community Care which had a total budget of £53,857m in 2022/23 which equates tp 23% of the
HSCP's overall budget.
Emergency admissions and Accident and Emergency attendances continuing to rise towards pre-
pandemic levels.
An increasing average length of hospital stay.
Recruitment and retention across almost all frontline services and the impact that this has had on
waiting times and service delivery.
The annual funding model restricts our ability to plan and sustain services beyond the current
financial year, including services commissioned from the Third Sector. 
High numbers of Domestic Abuse offending within West Dunbartonshire.
Increasing number of referrals from the Crown Office and Prosecution Service.
Re-establishing the links developed by the Champions Board with care experienced young people,
the community and corporate parents.
Recovering from the long term impact on MSK Physiotherapy waiting times of the redeployment of
MSK staff to support Acute colleagues during the pandemic as well as recruitment issues and
absence levels.  At the end of March 2023 there were 6 vacant MSK Band 6 posts across Greater
Glasgow and Clyde and sickness absence rates between August 2022  and March 2023 were
constantly over the 4% target: ranging from 4.04% in September to a high of 7.84% in January 2023. 
The cost of this team is £7.394m which equates to 3.2% of the HSCP's overall budget.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 7

Page 9

The Scottish Government's Public Bodies (Joint Working) Act (Scotland) 2014 sets out the
arrangements for the integration of health and social care across Scotland.  In line with the Act, West
Dunbartonshire Health and Social Care Partnership (WDHSCP) was established on 1st July 2015. The
Integration Joint Board for West Dunbartonshire is known as the West Dunbartonshire Health and
Social Care Partnership Board and is responsible for the operational oversight of WDHSCP.
 
All Health and Social Care Partnerships are required to produce an annual report outlining their
performance in the previous financial year by the end of July each year and these reports should be
produced in line with the Public Bodies (Joint Working) (Content of Performance Reports) (Scotland)
Regulations 2014.
 
The Coronavirus Scotland Act (2020) allowed HSCPs to extend publication date beyond July and we
have published our report in September in 2020, 2021 and 2022.  The Scottish Government has
recently advised that the extension and provisions made in the Coronavirus Scotland Act (2020) have
now come to an end, meaning that the reporting deadline reverts to that defined in the Public Bodies
(Joint Working) (Scotland) Act 2014.  Therefore, reports for the period 2022-23 should be published
by the end of July 2023. 
 
Due to this earlier timescale, data completeness issues at NHS Board level will mean that some of
the statistics within this report will be for calendar year 2022 rather than the full picture for the
financial year 2022/23.  This is in line with Public Health Scotland guidance recommending the use
of specific reporting time periods within Annual Performance Reports for 2022/23.
Introduction
Overview of the HSCP
West Dunbartonshire HSCP was formally established on 1st July 2015 in line with the Scottish
Government's Public Bodies (Joint Working) Act (Scotland) 2014 which sets out the arrangements for
the integration of health and social care across the country.
The HSCP's vision is:
The HSCP is committed to:
Early Intervention
Access
Resilience
Assets
Inequalities
Children and young people reflected in Getting It Right for Every Child.
Continual transformation in the delivery of services for adults and older people as reflected within
our approach to integrated care.
The safety and protection of the most vulnerable people within our care and within our wider
communities.
Support people to exercise choice and control in the achievement of their personal outcomes.
Manage resources effectively, making best use of our integrated capacity.
Improving lives with the people of West Dunbartonshire
This vision will be implemented through the delivery of our key strategic priorities: 
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 8

Page 10

West Dunbartonshire HSCP hosts the Musculoskeletal (MSK) Physiotherapy Service for the NHS
Greater Glasgow and Clyde area.  Work is ongoing within the service to ensure the delivery of high
quality outcomes for patients whilst striving to meet national waiting time targets.
The HSCP also hosts a programme of diabetic retinal screening on behalf of NHS Greater Glasgow
and Clyde and leads the Community Planning Partnership's Alcohol and Drugs Partnership.
Children's Specialist
Health Services
Looked After
Children
Children with
Disabilities
Health Visiting
Service
Children & Families
Social Work
Family Nurse
Partnership
West Dunbartonshire has an estimated population of 87,790 people and the HSCP has a workforce
of approximately 2,298 which equates to 1,842 full time equivalent at March 2023.  A large
proportion of HSCP staff live within West Dunbartonshire providing services to people within their
own communities.
Services are delivered across the two localities within West Dunbartonshire: Dumbarton/Alexandria
and Clydebank.
During 2022/23 the HSCP had responsibility for a budget of £228 million. 
Community Addiction
Services
Community Older
People's Services
Adult Care
Services
Residential and Day
Care Services
Learning Disability
Services
Community Hospital
Discharge
Care at
Home Services
Community Mental
Health Services
Criminal Justice
Social Work
District
Nursing
Musculoskeletal
(MSK) Physiotherapy
Diabetic Retinal
Screening
Community Pharmacy
Service
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Adult and Older People's services across all disciplines within integrated community teams
Children and Young People's services across all disciplines and in partnership with Education
Services
Criminal Justice Social Work
Community Mental Health, Learning Disability and Addictions services within integrated
community teams and inpatient services
With a continued emphasis on joining up services and focusing on anticipatory and preventative care,
our approach to integration aims to improve care and support for people who use services, their
carers and their families.
The Health and Social Care Partnership has delegated responsibility to deliver:
9

Page 11

Aims of the Annual Performance Report
The aim of this annual performance report is to provide an open and transparent account of the work
carried out across all service areas within the HSCP during 2022/23: improvements and challenges and
the direction of travel in our efforts to improve outcomes for residents of West Dunbartonshire.  The
report will also seek to demonstrate the HSCP's commitment to Best Value in the commissioning and
delivery of services.
This report will cover our performance between 1st April 2022 and 31st March 2023 and will describe
progress against the key strategic priorities outlined in our Strategic Plan 2019-2022. 
This will be our last report on the 2019-2022 plan as this year has seen the development of our new
Strategic Plan 2023-2026.   Our process of assessing and analysing the strategic needs of the people of
West Dunbartonshire and consulting with key stakeholders to develop our new plan is described later
in this report.
Policy Context
West Dunbartonshire HSCP's Strategic Plan 2019-2022 was developed in line with our five key
strategic priorities: early intervention, access, resilience, assets and inequalities.
These key strategic priorities reflect the Scottish Government's National Health and Wellbeing
Outcomes Framework which states that:
'Health and social care services should focus on the needs of the individual to promote their health
and wellbeing, and in particular, to enable people to live healthier lives in their community.  Key to
this is that people's experience of health and social care services and their impact is positive; that
they are able to shape the care and support that they receive, and that people using services,
whether health or social care, can expect a quality service regardless of where they live.'
The Health and Wellbeing Outcomes are embodied in the ethos of the Social Care (Self-Directed
Support) (Scotland) Act 2013 which aims to ensure that social care is controlled by the person to the
extent that they wish; is personalised to their own outcomes; and respects the person's right to
participate in society.
HSCP services are delivered to adults with critical or substantial needs in line with the HSCP’s
Eligibility Criteria for Adult Community Care Policy.  The eligibility criteria allows for discretion to be
applied in terms of providing adult social care for those people assessed as experiencing moderate
risk.
Self-Directed Support (SDS) is embedded in the HSCP’s assessment process across all adult and
children's services. The HSCP’s Integrated Resource Framework continues to support indicative
personal budgeting assessment, with the aim of this framework being to support fairness and
equality across all individuals assessed as eligible for local authority funded support.
The diagram overleaf depicts the links between our strategic priorities and the National Health and
Wellbeing Outcomes which focus on an individual's experience of health and social care and how
that care has impacted on their lives.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 10

Page 12

People who use health and social care services have positive
experiences of those services, and have their dignity
respected
People are able to look after and improve their own health
and wellbeing and live in good health for longer
Health and social care services are centred on helping
to maintain or improve the quality of life of
people who use those services
People who provide unpaid care are supported to look after
their own health and wellbeing, including reducing any
negative impact of their caring role on their own health and
wellbeing
People, including those with disabilities or long term
conditions or who are frail are able to live, as far as
reasonably practicable, independently and at home or in a
homely setting in their community
People using health and social care services are safe
from harm
Early
intervention
Access
Resilience
Assets
Resources are used effectively and efficiently in the
provision of health and social care services
Health and social care services contribute to reducing
health inequalities
People who work in health and social care services feel
engaged with the work they do and are supported to
continuously improve the information, support, care and
treatment they provide
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
National Health and Wellbeing Outcomes
Inequalities
11

Page 13

Public Protection
Public Protection provides a range of measures which can be used together to ‘protect our
people’.  This includes protection from harm for children and young people, vulnerable adults and
the effective and robust management of High Risk Offenders through our Multi-Agency Public
Protection Arrangements (MAPPA).  As such Public Protection is integral to the delivery of all adult
and children’s services within the HSCP.
The HSCP has a significant role within the Public Protection Chief Officers Group (PPCOG), with both
the Chief Officer and Chief Social Work Officer providing the necessary leadership, scrutiny and
accountability. This includes the management of high risk offenders and in assuring that each of the
services in place for child and adult protection are performing well and keeping the citizens of West
Dunbartonshire safe.
During 2022/2023 the focus for Adult Support and Protection (ASP) has been on progressing the
Joint Inspection of ASP Improvement Action Plan, the implementation of the ASP Learning Review
Guidance 2022, the National revised ASP Guidance Suite 2022 and the ASP National Minimum
Dataset 2023.
 
A number of positive improvement actions have taken place over the period which included an ASP
Development Event in February 2023.  The event was held on National ASP Awareness Day and
presentations provided by colleagues from Scottish Fire and Rescue, Police Scotland, Multi-Agency
Forum, NHS Public Protection Team, the HSCP and the Adult Protection Committee.  A workshop also
took place to look at practice and processes.
The event provided the opportunity for adult protection partners to come together and review local
improvement actions, developments and learn about each other’s roles in relation to adult
protection and protecting vulnerable adults from harm.  HSCP staff also had the opportunity to
reflect on the findings of an audit of the new ASP duty system: what is currently working well and
where things may be done differently or better.
 
Adult Protection Committee (APC) subgroups were introduced at the beginning of 2023 and provide
a framework to support West Dunbartonshire APC in driving forward key developments around:
policy and practice; data scrutiny; quality assurance and evaluation; learning and development; and
communication and engagement.  The subgroups also provide the opportunity to engage staff
working across partner agencies and a range of service areas, thus widening the network of those
involved in shaping the local and national adult protection agenda and key priorities.
 
A National Implementation Group and sub groups have been set up to support ASP partnerships
with the work around the new ASP Minimum Dataset and embed policy revisions into practice and
process.  Local representatives have been identified for each of the groups and it is anticipated this
work will be ongoing for approximately 18-24 months.
Following the 2021/ 22 Children’s Services Inspection for Children and Young People at Risk of
Harm, a children’s services improvement plan was developed focusing on key areas of feedback. This
included a focus on assessment and planning activity, engagement with children, young people and
their families, and staff training and development.  Inspection feedback informed a comprehensive
plan to develop and improve children’s social work services and wider children’s services partnership.
A number of areas of audit activity have been identified (initial referral discussions, re-registrations
on the child protection register and thresholds for referrals amongst others) and are in progress,
with staff training and development opportunities having been located primarily around the areas
for development highlighted by the inspection.
Other areas of development work remain ongoing, such as domestic abuse training, core child
protection training and specific training in respect of the process of assessment, SMART planning
and chronology building.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 12

Page 14

We have also been working with partners to fully implement the new National Guidance for Child
Protection 2021.  In this context, the Scottish Child Interviewing Model (SCIM) will be implemented
locally in May 2023 supported by the national SCIM team and local partners within Police Scotland,
Education and Health.  This work has been undertaken in partnership with Argyll and Bute Council,
and is in the early stages of implementation, overseen by a joint implementation group.  A hybrid
model is in place supporting the use of the SCIM methodology in some cases where children require
to be interviewed jointly by police and social work, while the previous model of Joint Investigative
Interviewing also remains in place.
West Dunbartonshire is part of North Strathclyde MAPPA arrangements, along with five other local
authority areas, supported by a dedicated MAPPA co-ordinator who provides professional advice and
guidance.  The MAPPA Unit team also support responsible authorities to fulfil their statutory duties
around information sharing and joint working to assess and manage the risk of individuals managed
within MAPPA.
The CSWO continued to attend the North Strategic Oversight Group and the Justice Service Manager
is a member of the Management Oversight Group, where both groups include responsible authorities
(Local Authorities, Police Scotland, Scottish Prison Service and Health).
The MAPPA Unit’s performance report noted 100% compliance, with key performance indicators for
cases managed at level 2 and 3 (multi-agency risk management) being reviewed no less than 12
weekly.  Furthermore, Justice Services were fully compliant with all national key performance
indicators, where all MAPPA meetings were held and notifications submitted to the MAPPA Unit
within fixed timescales: no exceptions were reported during 2022/23.
Access to Information
West Dunbartonshire Council and NHS Greater Glasgow and Clyde as public authorities have a legal
requirement to provide requested information in line with the Freedom of Information (Scotland)
Act 2002 and the UK General Data Protection Regulation (UK GDPR), tailored by the Data Protection
Act 2018.
The Freedom of Information (Scotland) Act 2002 (FOISA) came into force on 1 January 2005. Under
FOISA, a person who requests information from a Scottish public authority which holds it, is entitled
to be given this information by the authority subject to certain conditions and exemptions set out in
the Act.  This information should normally be provided within 20 working days of receiving the
request.  The HSCP's Integration Joint Board also has a responsibility to provide information under
FOISA in relation only to the functions of the Integration Joint Board.
Through television, newspapers and social media, people's right to request information
under FOISA, and the power national or locally aggregated information can have, has become
widely known.  Public authorities can refuse to provide information under very strict exemptions
contained within the Act and individuals have the right to request a review of these decisions by the
public authority.  If they are subsequently unhappy with the outcome of the review they can appeal
the response with the Scottish Information Commissioner.
There were 127 Freedom of Information requests relating to HSCP services received in 2022/23, an
increase of 3% on the previous year.  The legislation allows public bodies to seek clarification from a
requester where there is some uncertainty about the exact information that is being requested. 
During 2022/23 the HSCP requested clarification in relation to 5 Freedom of Information requests
where no response was received.
Of the remaining 122 requests, 68% were responded to within the timescale: a decrease on 88% in
2021/22 and the average response time was 25 days.  Most delays involved responses being
collated from a number of different sources across services.  The numbers below represent the main
service area covered in the request however many requests cover both service delivery and the
associated financial and staffing information.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 13

Page 15

Often information requests under FOISA relate to information which is already published either on
the HSCP, Council or Health Board website or on the websites of organisations the HSCP submits
data to, such as the Scottish Government or Public Health Scotland.  In that event we will signpost
an individual to the published information to maintain the consistency of information held in the
public domain.  
Under the Data Protection Act 2018 individuals have the right to access their own information held
by an organisation.  They can do this in the form of a Subject Access Request (SAR).  Organisations
have one month to provide the information and this can be extended by up to two months if the
request is complex or an individual has made a number of requests.
A SAR can also be made on behalf of another individual where the individual has provided their
permission. The information collated for a SAR response may contain reference to other individuals
or third parties. Where this third party is not an HSCP employee carrying out the functions of their
role and authorisation has not been provided to release their information, this information will be
removed or redacted from the response.
During 2022/23 the HSCP received 99 SARs: a 34% decrease on the previous year.  Responses were
issued within the initial or extended timescales for 91% of requests.  Many SAR responses
are lengthy and involve significant checking and redaction by HSCP staff.
The HSCP also provides information to the Scottish Government and Public Health Scotland.
Quarterly and annual returns on service volume and the demographics of people who use HSCP
services are submitted for all HSCP services: Older People, Adult, Children’s and Criminal Justice
services.  The Scottish Government and Public Health Scotland use this information for a number of
specific purposes such as: monitoring the implementation of national policies or legislation; to
inform funding and planning decisions; to predict the future needs of Scotland and local
populations; and to develop models of care and service delivery and inform policy makers.  Much of
this information is published at aggregate level on their websites and therefore available in the
public domain.
In line with Data Protection and UKGDPR the HSCP has a requirement to inform people of how their 
information will be used.  Privacy Notices relating to the various types of information we submit are
available on the HSCP website.  These outline how we hold, manage, process and submit an
individual’s information and an individual’s rights with regard to their own information.
The HSCP also provides information in the form of complaint responses.  Full details of how to make
a complaint can be found on the HSCP’s website and more detailed information on the HSCP’s
performance in relation to complaints handling can be found in our Annual Complaints Report
2022/23.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 14

Page 16

National Performance Measurement
Core Integration Indicators
The Scottish Government has developed a suite of 23 Core Integration Indicators to help HSCPs
monitor their performance against the National Health and Wellbeing Outcomes and allow for
comparison nationally and by partnership.  Of these indicators, 5 are not currently being reported
nationally.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 15
The chart overleaf shows West Dunbartonshire's position in comparison with the other 30 HSCPs in
Scotland.  The numbering on the chart denotes where West Dunbartonshire ranked in Scotland with
1 being best performing and 31 worst performing.   Appendix 1 provides the detail behind the
rankings and comparison with national figures.  West Dunbartonshire performed better than the
Scottish national figure in 10 of the 18 indicators.

Page 17

Core Integration indicators 1-9 are gathered from the Health and Care Experience Survey which is
carried out every 2 years.  The survey was carried out during 2021/22 and is not due to be carried
out again until 2023/24.
West Dunbartonshire had the 2nd highest proportion of respondents who agreed that the services
and support they receive help improve or maintain their quality of life: 85.7% compared with a
Scotland-wide figure of 78.1%.  Those who thought their health and social care services were well
co-ordinated moved from 10th to 3rd in Scotland and 87.9% of adults being supported at home said
they felt safe, also the 3rd highest in Scotland. 
The proportion of West Dunbartonshire residents supported at home who agreed that they were
being supported to live as independently as possible moved from the 11th lowest in Scotland in
2019/20 to the 6th highest in 2021/22. 
Premature mortality rates for 2022 will not be available until July 2023 and therefore not in time for
this report however in 2021 West Dunbartonshire had the 2nd highest premature mortality rate in
Scotland: the rate of deaths per 100,000 for people aged under 75 years.  Similarly the proportion of
Care Inspectorate Inspections graded at 4 (Good) or above during 2022/23 will not be available to
meet our report timescales however in 2021/22 West Dunbartonshire HSCP services performed 2nd
best in Scotland with 87.7% of inspections meeting this criteria. 
Due to data completeness issues at Health Board level we are having to compare provisional 2022
calendar year figures with 2021/22 financial year figures for some of our hospital-related indicators.
The former will be subject to update once the full financial year data is available and will therefore
differ in our 2023/24 Annual Performance Report from those reported here.
In 2022 we had the 9th highest emergency admission to hospital rate in Scotland and the 4th
highest bed day usage for emergency admissions.  These combine to reflect a longer average length
of hospital stay for West Dunbartonshire residents and the complex health needs of our population. 
Readmission rates by contrast were the 8th lowest in Scotland for West Dunbartonshire residents,
suggesting appropriate discharge at the right time to the right place.
Delayed hospital discharge continued to be a significant challenge for the HSCP and the rate of bed
days for people aged 75 and over whose discharge was delayed increased from the 7th highest in
Scotland in 2021/22 to 2nd highest in 2022/23. Falls rates in West Dunbartonshire improved slightly
from 19th to 16th highest while the proportion of the last 6 months of life spent at home or in a
community setting fell slightly from 89.4% in 2021/22 to 88% in 2022: falling from 20th in Scotland
to 27th.
Delivering support to people at home continues to be a strongly performing area for the HSCP.  In
2022 the percentage of adults with intensive needs being supported at home was the 5th highest in
Scotland at just over 71%: the Scotland figure was 63.5%. 
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 16

Page 18

Local Government Benchmarking Framework
The Local Government Benchmarking Framework (LGBF) is a benchmarking tool designed to allow
councils and the public to measure performance on a range of high level, comparable indicators that
cover all areas of local government activity.  The LGBF was developed by the Improvement Service
and the Society of Local Authority Chief Executives (SOLACE Scotland).  LGBF indicators cover
efficiency, output and outcomes for those who use council services.  The framework is designed to
focus questions on variation of costs and performance as a catalyst for improving services and more
effectively targeting resources.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 17
The chart below shows West Dunbartonshire's position in 2021/22 in comparison with the other 31
Local Authorities in Scotland for those indicators for which the HSCP has responsibility.  The
numbering in the chart denotes West Dunbartonshire's ranking from 1 best performing in Scotland to
32 worst performing.
Appendix 2 provides the detail behind these rankings as well as comparison with the national figure.
During 2019/20 new indicators were added to the existing LGBF suite which have been pulled
directly from the Core Integration Indicators.  To avoid duplication these are not included in this
section or in Appendix 2.

Page 19

Of the remaining 10 indicators, the HSCP performed better than the Scottish national figure in 5 of
the indicators during 2021/22.  West Dunbartonshire had the 3rd lowest weekly cost for children
looked after in a residential setting and the 4th lowest for children looked after in the community:
26% and 41% lower than the Scotland figure respectively.  Only 3% of child protection registrations
were re-registered within 18 months in West Dunbartonshire, which is the 9th lowest in Scotland.
The percentage of Looked After Children with more than 1 placement in 2021/22 (August – July) was
11.7%, which is lower than the Scotland figure of 15.9%.  The proportion of people aged 65 and over
receiving personal care at home was the 2nd highest in Scotland at 72.9%.
The HSCP's worst performing indicators were: expenditure on Direct Payments or Personalised
Budgets, as a proportion of overall Social Work spend, with the lowest figure in Scotland and the
percentage of children reaching their developmental milestones at 27-30 months of age which will
be considered further during this report.  In relation to Direct Payments and Personalised Budgets,
these are Options 1 and 2 of Self-Directed Support.  This indicator does not take account of
expenditure on services for people who select Option 3 under Self-Directed Support which means
they have made a choice to request that the local authority arrange and pay for services on their
behalf.
The weekly cost for residential care for older people has continued to be the 8th highest in Scotland
in 2021/22 with all local authorities seeing a significant increase in costs which may relate to the
pandemic.
Ministerial Steering Group
The Ministerial Steering Group (MSG) for Health and Community Care continues to closely monitor the
progress of HSCPs across Scotland in delivering reductions in: delays in hospital discharge; unnecessary
hospital admissions; attendances at accident and emergency (A&E); and shifting the balance of care
from hospital to community settings.  In light of the integration of health and social care services
significant improvements in ways of working and efficiencies are expected.
As in the previous two years no national targets for MSG were set for 2022/23.   Local targets were
agreed for 2020/21 on the basis of the potential impact of a number of workstreams, however the
pandemic made some of these workstreams difficult to implement or maintain and it was felt
reasonable to retain these targets for 2021/22 and then again in 2022/23 pending the review of all our
Key Performance Indicator targets for 2023/24 in line with our new Strategic Plan.  
Unfortunately, due to data completeness issues at Health Board level, we do not yet have full financial
year data for 2022/23 for all of our MSG indicators and have been advised by Public Health Scotland to
report 2022 calendar year figures for emergency admissions and unscheduled bed days and compare
these with previous financial year figures.
Only two of our MSG local targets were met in 2022.  Emergency admissions to hospital of West
Dunbartonshire residents aged 18 and over were 6% below target and 2.8% lower than in 2021/22.  
Similarly our rate of emergency admissions for those aged 65 and over is slightly below our target of
271 per 1,000 population at 268.6.  The number of unscheduled acute bed days used by people aged 18
and over exceeded our target by 22% and numbers were 9.5% higher than in 2021/22.  These numbers
combine to show us an increasing length of stay for those admitted to hospital on an
emergency/unscheduled basis: fewer admissions but higher numbers of bed days used.
The number of bed days used where people's discharge from hospital has been delayed was more than
twice our target of 5,839 in 2022/23, at 13,905.  This was also 36% higher than our 2021/22 figure. 
While there have been significant challenges nationally in relation to delayed discharge, West
Dunbartonshire has seen unprecedented levels of delays with bed days involving complex, adults with
incapacity cases making up more than our annual target for all delays.   Attendances at Accident and
Emergency Departments were almost 18% above target however were still 11% lower than the pre-
pandemic rates of 2019/20.
Charts detailing monthly trends for the MSG indicators over the previous 3 years can be found at
Appendix 3 and further details of our efforts in relation to hospital activity can be found in the
Unscheduled Care section later in this report.
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 18

Page 20

Performance against Strategic Priorities
This section of our report will describe our performance against our 5 strategic priorities during
2022/23 with specific regard to the areas outlined below.  Performance against our Strategic Plan
indicators can be found at Appendix 4.
Priority 1: Early Intervention
Children and Young People's Mental Health
Unscheduled Care
Child Development 
Development of HSCP Strategic Plan 2023-2026
Priority 2: Access
Self-Directed Support
Supporting Carers
Learning Disability Services
Justice Social Work Services
Priority 3: Resilience
Adversity, Trauma and Resilience
Adult and Older People Mental Health Services
Priority 4: Assets
MSK Physiotherapy
HSCP Staff Health and Wellbeing
Child Protection
Priority 5: Inequalities
Keeping The Promise
Equality Mainstreaming Activity
Medication Assisted Treatment Standards
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023 19

Page 21

20Annual Performance Report 2022/2023
The HSCP is working towards a whole system approach to child and adolescent mental health
and wellbeing, spanning ages 5 to 24 years and up to 26 years if the young person is care
experienced.
The whole system approach is defined by Public Health Scotland as an ‘ongoing and flexible
approach by a broad range of stakeholders to identify and understand current and emerging
public health issues, whereby working together, we can deliver sustainable change and better
lives for the people of Scotland’.  This approach is a collaborative model across stakeholder
organisations: sharing intelligence and expertise and creating opportunities to focus on early
intervention and prevention.
To support this work the University of Glasgow was commissioned by the HSCP to undertake a
comprehensive review and analysis of children and young people’s community mental health
and wellbeing services and supports in West Dunbartonshire: exploring current practice and
identifying good practice and areas for development.
Engagement was undertaken in three phases to understand the needs of young people and
their families on how to support their mental health and emotional wellbeing at a community
level.
The review’s final report published in June 2022 sets out key recommendations and six areas
for consideration to inform future strategic planning for community mental health and
wellbeing services for children and young people.
Phase one: stakeholders and practitioners’ attitudes and experiences of collaboration
Phase two: parents’ and guardians’ attitudes and experiences of help-seeking on behalf of
their children
Phase three: children and young people’s experiences of information and support seeking in
terms of mental health and wellbeing
West Dunbartonshire Health and Social Care Partnership
Priority 1: Early Intervention
Children and Young People's Mental Health

Page 22

21Annual Performance Report 2022/2023
In response to one of the Review's findings that a future area for development should be to
'Increase the visibility of services operating at community level', work was commissioned to
design, build and manage a Wellbeing website.  The site will inform local children, young
people, their families, and professionals who work with them, and direct them to support and
services that will support their mental and emotional wellbeing. 
West Dunbartonshire Wellbeing website was inspired and co-produced through engagement
with young people from West Dunbartonshire secondary schools.  Y Sort it and West
Dunbartonshire Youth Council, Social Work, the Whole Family Wellbeing Fund Group and
Violence Against Women and Girls Partnership also contributed to the content.  The Working
Group will continue to collaborate with youth organisations to review content and support the
promotion of the resource. The web resource will be available from June 2023.
West Dunbartonshire Distress Brief Intervention (DBI) Associate Programme is a service for
young people experiencing emotional distress with the aim of 'ask once get help fast'.  The
service is for young people aged 16 years to 24 years (26 years for care experienced young
people) to specifically support those who are experiencing ‘emotional distress’ and not
requiring clinical interventions. 
The multi-agency DBI Associate Programme Delivery Group was established in September
2021 and leads on the implementation of the new DBI Associate Programme.  Membership of
the delivery group includes the National DBI Programme Manager, DBI Service Manager, Police
Scotland, Scottish Fire and Rescue, with representation from West Dunbartonshire Mental
Health Services, Primary Care, Health Improvement, Education, Learning and Attainment,
Specialist Children’s Service, and Looked After and Accommodated Children.  The delivery
group is co-chaired by West Dunbartonshire Council/HSCP and Scottish Association for Mental
Health (SAMH).
SAMH has been commissioned as the third sector partner providing the person-centred
support for each referral.  To support referrals into the programme key frontline services are
identified by the delivery group to undertake a one-hour online Learnpro module on the DBI
process and providing a compassionate response to distress.  During 2022/23 training was
offered to over 175 frontline workers.   Online training has also been completed by 90 local
partners who can make referrals to the service. 
An incremental approach has been taken since March 2022 to implement the service with all
primary care sites active as of June 2022 and all five secondary education sites active as of
November 2022.   In December 2022, West Dunbartonshire was invited to become the fifth
national pilot site to offer DBI to 14 and 15 year-olds.  This pathway commenced on 30th
January 2023 in two schools, with the remaining three secondary schools beginning in
February 2023.  The DBI delivery group continues to use learning from the national
programme and other associate programme areas and to explore additional referral pathways
for younger children e.g. Primary Care.
There were 55 referrals to the service during 2022/23.  Support is provided within 24 hours of
referral and for up to 14 days thereafter.  Reasons for children and young people accessing the
service in 2022/23 included: anxiety/low mood; education/attendance; health issues;
bereavement; relationships with friends/home life; rape/sexual assault; self harm or suicidal
ideation; sleep; financial/home/overcrowding.  Data analysis support is provided by Public
Health Scotland. 
West Dunbartonshire Health and Social Care Partnership

Page 23

22Annual Performance Report 2022/2023
Young person B was referred to the DBI Service with a Distress Level of 8 via the Education
referral pathway.  The young person was presenting with anxiety and panic attacks and a
possible diagnosis of Autism Spectrum Disorder and had worked with various other health
care providers. 
Over the course of the intervention the young person and DBI practitioner had four face to
face meetings (B's preferred method of communication) over a period of two weeks,
followed by a fifth face to face meeting with a parent and the referrer from Education. 
Each meeting lasted approximately one hour and was followed up with an email to the
young person.  This email would summarise what was talked through, some of the
solutions discussed and links to further resources for information and support.  B could
then amend or correct anything that the practitioner may have misunderstood or not
captured correctly.  If B chose, they could then share the contents of this email with their
parents.  Lastly a final summary was emailed to the education establishment, parent and
young person for conclusion and next steps agreed. 
The service communicated with B via email and text outwith these face to face meetings. 
This was all done following a discussion with B who consented to this and felt it would be
supportive in communicating their thoughts/needs and views. 
Supports provided by the DBI service included:
Support provided to advocate young person’s view/feelings
Support to attend meetings and have voice heard
Resources and information provided to school/family to enable them to support the
young person more effectively
West Dunbartonshire Health and Social Care Partnership
By the end of the intervention B's Distress Level had reduced from 8 to 4.  Several weeks
later the DBI practitioner bumped into B who advised they were feeling much better, more
positive and felt DBI had helped to assist them to communicate their opinions and choices.
Feedback from West Dunbartonshire Council Education colleague:
“In the short time we have been referring to the DBI service, the experience we have had as
a school and the support for our young people has been excellent. The communication with
the DBI team has been very good and our young people have all received contact within 24
hours of the referral being submitted. The approach that the DBI Practitioner has taken
with our young people has allowed them to access support in a caring and nurturing
environment and they have all appreciated her input into their care plan. I look forward to
continuing to work with the service and see how it develops and grows as a form of
support.”
Summary of Distress Brief Intervention
The University of Glasgow Review highlighted training opportunities for parents as an area
for development.  During 2022/2023 a total of 90 parents and carers of young people
completed support and education sessions following a diagnosis of a child or young person
with neurodiverse issues such as autism.  All sessions were delivered by a neurodiverse
trainer.  Feedback was received via evaluation forms completed by some parents immediately
post attendance and via telephone survey carried out three weeks after the sessions.

Page 24

23Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Parent and carers who completed the sessions reported:
significant increase in knowledge and understanding of diagnosis.
provision of skills to help support child’s communication needs, distressed and anxious
behaviours, and sensory issues. 
speaking to other parents in similar situations helpful, alleviated feelings of isolation. 
The Disability Sports Youth Group programme continues to support young people with
additional support needs and empower the young people to be part of their local community
within a sport and physical activity environment.  The aims of the programme are that:
By increasing participation and engagement with young disabled people the Group aims to
enhance their skills for life and learning and reduce social anxiety by improving confidence
and overall wellbeing. 
Members have attended several training courses that were adapted for their needs. These
courses included Disability Sports Awareness, Coaching Footballers with a Disability,
Managing Finances, First Aid, and Child Protection. These courses, along with the
development activity delivered within the weekly sessions, have enhanced the skills and the
confidence of the young people. The next step for members of the group is to identify
volunteering opportunities with partner organisations. For some, this will involve supporting
the delivery of sport and physical activity sessions and/or volunteering at sports festivals and
events in the local community. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The Disability Sports Youth Group puts young people at the heart of the sessions, enabling
them to make decisions and influence activity and progress. They are encouraged to help
deliver some activity to their peer groups, engage in discussion and help to make their own
and group decisions.
Each young person to gain a minimum of one sporting governing body qualification.
Two young people with additional support needs will gain a volunteering position in West
Dunbartonshire Leisure Trust to support the delivery of weekly football, athletics and
gymnastics sessions.
The group will volunteer at a minimum of four community sports events to support the
delivery of local physical activity events.
“I was very impressed with the trainer; she was
outstanding at facilitating the sessions.  I feel parents
would find this training very useful prior to diagnosis. 
I feel if I had known what I know now I would have been
better equipped to support my daughter.”  Mum

Page 25

Unscheduled Care
Unscheduled care refers to any unplanned contact with health services including urgent care and
acute hospital emergency care.  It can be in the form of attendance at Accident and Emergency
departments (A&E), hospital Assessment Units, unplanned or emergency admission to hospital and
delays in discharge from hospital when a person has been deemed medically fit for discharge. 
Increased demand on acute hospitals and the impact of an ageing population has resulted in a
drive to tackle unscheduled care by developing more early intervention initiatives to prevent
unnecessary hospital admissions and to provide more health services within the community.
During 2020/21 the HSCP worked with NHS Greater Glasgow and Clyde (NHS GGC) and the 5 other
HSCPs within the Health Board area to develop an Unscheduled Care Joint Commissioning
Plan focused on adapting service models in response to an increasingly older population and
changes in how and when people choose to access services: aiming to meet patients’ needs in
different ways, ensuring services are  integrated and that people understand more clearly how to
use them.
Unscheduled care continued to return to pre-pandemic levels during 2022/23.  Calendar year 2022
saw emergency admissions increase for 5 of the 6 HSCPs in Greater Glasgow and Clyde on the
2020/21 figure, with West Dunbartonshire having the 2nd largest increase at 2.8%.  Unscheduled
bed days in 2022 and attendances at A&E in 2022/23 increased for all 6 HSCPs on the 2020/21
figures.  West Dunbartonshire had the 3rd highest increase in unscheduled bed days at just over
20% and the 2nd highest increase in A&E attendances.  When considered as a rate per 100,000
population, West Dunbartonshire had the highest rate for emergency admissions 18+ and the 2nd
highest rate for unscheduled bed days 18+ and A&E attendances 18+. 
After being fairly steady from April 2017 to early 2020, the average length of hospital stay has been
increasing in each partnership in Greater Glasgow and Clyde since the start of the pandemic in
March 2020.  West Dunbartonshire has seen the average length of stay for those aged 18+ increase
from just over 7 days in April 2019 to a peak of almost 11 days in April and October 2022.
The concern is that this increase in average length of stay is reflecting a trend in people being more
ill on admission to hospital due to the impact of pandemic lockdowns or later access to services or
diagnosis. 
The most formidable challenge in relation to unscheduled care continued to be the volume and
length of delayed discharges from hospital in 2022/23.  Admission to hospital is often necessary and
effective and timely discharge from hospital to the most appropriate setting is vital to improve
outcomes for individuals and to avoid readmission.  A delayed discharge is where a person has been
deemed medically fit for discharge back home or to a care home but the discharge is unable to take
place.
24
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023

Page 26

This may be due to lack of services within the community, the availability of an appropriate care
home placement, or the person's lack of capacity to make a decision about their future care needs.
The latter may entail a guardianship application under Adults with Incapacity (AWI) legislation to
allow the decision to be made on the person's behalf: a process which can be lengthy and complex
particularly where family members have differing views on the best care setting for their loved one.
Since the HSCP's inception in 2015, West Dunbartonshire had seen an improving trend in the
number of bed days lost to delayed discharges with a slight increase in 2019/20.  However the
number of delays and associated bed days has increased significantly during 2020 to March 2023.
There has been extensive monitoring and scrutiny of delayed discharges within the HSCP and with
both the Health Board and West Dunbartonshire Council.  We are not alone in experiencing
significant increases and this is a national issue.  Processes have been reviewed within West
Dunbartonshire and long delays analysed to identify common themes however when looked at as a
rate per 100,000 population we continue to have the highest delayed discharge bed day rate in
Greater Glasgow and Clyde.
A whole system review of the multifactorial issues that can impact on delays was completed and the
resultant quality improvement action planning was implemented across a wide range of themes.
Examples include daily scrutiny of each person fit for discharge but delayed in hospital by the Head
of Service to target required actions to facilitate a discharge, and improved pathways of care within
and across Health and Social Care teams in the HSCP.
Other examples include a review of the appropriate application of Adults with Incapacity legislation
to reduce delays that relate to this, and collaboration with colleagues in the Vale of Leven hospital
to complete a 'deep dive' of delays across three wards to review the patient journey to identify
missed opportunities with resultant bed days lost.  Given the ongoing challenge in relation to
delayed discharges, the quality improvement process will remain in progress with the aim of
achieving a sustained downward trend in the number of delays.
Our Hospital Discharge Team continue to support people to be discharged home without a delay
and proactively identify people for early assessment to make the discharge process as efficient and
timely as possible once a person is deemed medically fit for discharge.  They have continued to have
an active presence in hospital wards throughout the pandemic, covering the Royal Alexandra
Hospital in Paisley and the Vale of Leven Hospital as well as the Glasgow hospitals.  A review of the
early identification process to prioritise those at risk of becoming a delay is underway, with direct
links to the national 'Discharge without Delay' priority areas.
The chart overleaf illustrates the volume of work undertaken by the team and demonstrates that the
majority of people delayed are not static.  Over the last year significant progress has been made in
discharging those with the longest delays and most delays are relatively short.
25
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023

Page 27

There were 353 new delayed discharges in 2022/23: a 27% increase on 2021/22.  This will include
people who are deemed medically fit who then become unwell and are deemed not fit for discharge.
Many of these people may then become a new delay again once they recover.
Preventing avoidable or unnecessary admissions to hospital is also key to how we tackle the volume
of unscheduled care and ensuing delays.
26
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Case Study: Urgent and Unscheduled Care
The  Scottish Ambulance Service (SAS) attended Mr Y and followed the SAS/Focused
Intervention Team (FIT) referral pathway to prevent an admission to hospital.  Mr Y was
demonstrating clinical symptoms of respiratory distress with low oxygen levels, a high
respiratory rate and struggling to perform any activities of daily living.
Mr Y expressed to paramedics a strong desire not to be taken to hospital.  Paramedics provided
all treatments that they could, nebulisers and inhalers, which led to some improvement.  SAS
then made onward referral to FIT, who are guaranteed to attend within 2 hours.
 
FIT attended and monitored Mr Y as his condition required, ensuring that further prescribed
therapies were administered which continued to improve his condition. The COPD Nurse within
FIT prescribed exacerbation rescue medication to reduce the risk of future exacerbations and
reduce the risk of requiring SAS or admission to hospital in the future. 
The nurse recognised Mr Y's strong wish not to be taken to hospital due to worsening
symptoms of respiratory illness and discussed an Anticipatory Care Plan (ACP).  This plan was
subsequently completed on clinical portal and included a ceiling of care to narrate how low
oxygen saturations could be allowed to go with continued treatment at home, and also Mr Y's
preferred place of death.
Following a learning review a range of improvement activities were initiated across Health and
Community Care in 2022/23.  One of these was the development of a 2 weekly multidisciplinary
meeting with representatives from District Nursing, Care at Home and senior Social Work staff from
Older Adult Services as a platform in which to discuss service users that staff have concerns about.
The aim of this forum is to allow early identification of changing health and care needs, ensuring a
co-ordinated and person-centred response and prompt referral to any other services which may not
yet have been considered.  Having been in place since October 2022 this is now being embedded in
practice, and opportunities to use this meeting for wider person-centred care discussions, for
example by including carer support workers and representation from the Self-Directed Support team
are also being considered.

Page 28

27
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
The District Nursing Service across Greater Glasgow and Clyde has a suite of Key Performance
Indicators, with data pulled from the DN record keeping system.  In terms of performance, in March
2023 all three areas - catheter acquired infections, tissue viability and food, fluid and nutrition -
were above 90% and had been consistently across the year. 
The national nursing Combined Care Assurance Audit Tool (CCAAT)  is a comprehensive audit tool
that investigates a range of activities, inclusive of record keeping and direct supervision of staff, and
is repeated 6 monthly when at green. The West Dunbartonshire DN team have been scoring green
(80-90%) over the last year. 
Among the HSCP's equality outcomes is that all adults supported by DN teams have their
religious/beliefs considered by the service in relation to their ongoing care.  All patients are asked
about their religion and beliefs as it is embedded within the patient assessment.  As the assessment
is patient-centred, if the patient indicates religion/belief it is included in their Anticipatory Care
Plans and Palliative Care plans.
Additionally, DNs have a vast amount of knowledge and understanding on how cultural factors may
shape people’s healthcare needs which is demonstrated in the service's assessments and care plans
when appropriate. 
Reflective Case Study: Integrated Care
Mrs X was a lady at end of life and living at home, however her family did not feel able to care
for her to die at home.  The District Nursing (DN) Service was involved in her care but she
experienced an unexpected rapid decline and the family wished an admission to hospital. 
Initially the DN team offered a range of community-based supports to allow Mrs X to remain at
home and referred to Care at Home and Duty Social Work.
Duty SW staff made contact with Mrs X's family and there was discussion about the most
appropriate 'next steps'.  As a hospital admission was not indicated, the preferred option would
be to admit Mrs X to a local care home as an emergency admission and allow her to die with
dignity and her family at her side. 
The challenge was that the process to arrange an emergency admission can take up to 48 hours
and this situation was time critical.  Mrs X died peacefully two days later at home, with support
from care at home and the DN service.  Although the family were grateful for the support they
received, they were also disappointed that there was no opportunity for an admission to
hospital nor to a local care home. 
The Senior Nurse held a reflective learning session with key staff to review this case and
consider improvements that could be made to allow a more responsive outcome and to identify
gaps in service availability to inform decision making. 
This session was productive and staff were able to share their decision making and views in a
safe environment.  Outcomes from the meeting involved enhancing pathways of
communication across District Nursing and Social Work staff, with support from Local Authority
residential care homes. 
The 'admission avoidance' bed that was in place in the old Frank Downie Care Home will be
reinstated as a trial in Queens Quay Care Home.  The DN service will continue to ensure that
Anticipatory Care Plans are completed timeously when people are admitted to caseloads for
palliative care.  The service will also manage expectations with families as there may not
always be an alternative place of care available when end of life approaches and sometimes a
death at home will need to be managed with full support from the DNs and Care at Home. 
In addition Social Work staff are implementing the new Area Resource Group process inclusive
of the emergency admission pathway which removes the need for a full My Life Assessment 
however a face to face visit is required and should be prioritised in end of life situations.  This
should allow a prompt response to facilitate an admission to a care home.

Page 29

Child Development
The HSCP is committed to improving outcomes and supporting the wellbeing of our children and
young people, aiming to give every child the best possible start in life.  Early years have a profound
impact on an individual's future experience of health and wellbeing. 
The Universal Health Visiting Pathway defines and enhances Health Visitors' responsive way of
working with parents and their children.  The Health Visiting service focuses on relationship building
with the family; ensuring that families' needs are appropriately assessed and responded to in a
person-centred and supportive way. 
The Universal Health Visiting Pathway is offered to all families.   It offers 11 home visits in total, 8 of
which will be in the first year of life followed by 3 developmental child health reviews at 13-15
months, 27-30 months and 4-5 years.  These reviews are carried out to assess whether each child is
meeting all of their developmental milestones such as speech, language and communication,
hearing, vision, personal/social, behavioural/emotional, fine motor and gross motor skills.  Latest
available statistics for reviews carried out at 27-30 months of age are for 2021/22 which are also
reported through the Local Government Benchmarking Framework. 
Take up of 27-30 month reviews for those children of eligible age was 95% in West Dunbartonshire
in 2021/22: higher than the Scotland or NHS Greater Glasgow and Clyde figures, which were 89.4%
and 92.3% respectively.  This was also the second highest proportion across the 6 HSCPs within
Greater Glasgow and Clyde behind East Dunbartonshire. 
The proportion of children reviewed in West Dunbartonshire where there were no developmental
concerns identified through the review however was the lowest in Scotland in 2021/22 at 73.95%
compared with a Scotland figure of 82.14%.  Looking at West Dunbartonshire's performance and
ranking since reporting began in 2013, these have been in decline since 2017/18 where we ranked
14th worst in Scotland at 82%.
28
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Such a rise in developmental concerns among the very youngest in our community is deeply
worrying.  While studies are already looking at the impact of the pandemic on child development,
health inequalities and deprivation have a significant part to play and will also have increased the
pandemic's impact on those most vulnerable.
Health inequalities are unfair and avoidable differences in health across the population, and
between different groups within society due to the conditions we are born into, live and grow in and
have a long term impact on our opportunities for good health and wellbeing.  Health inequalities at
such a young age, 27-30 months old, will have far-reaching consequences.

Page 30

29
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
West Dunbartonshire has the 4th highest proportion of datazone areas in the most deprived 20% of
Scotland compared to other councils.  The Scottish Index of Multiple Deprivation identifies 5
quintiles ranging from SIMD1 most deprived to SIMD5 least deprived.  Within West Dunbartonshire
66% of the population live in areas categorised as SIMD1 and SIMD2: 40% within SIMD1.  By
contrast, just 6% of the population live in SIMD5 areas.  Deprivation impacts upon life expectancy,
healthy life expectancy and health inequalities.
When we look at the local authority areas with the lowest  and highest proportion of children with
no developmental concerns against the most and least deprived council areas in Scotland, the
overlap is stark.
As we can see above, 8 of the 10 local authorities with the lowest proportion of 27-30 month old
children with no developmental concerns are also among the 10 most deprived local authorities in
Scotland.  Of the 10 local authorities with the highest proportion of children with no developmental
concerns, 6 are among the 10 least deprived local authorities in Scotland.
West Dunbartonshire's population further illustrates this link.  The difference between the most and
least deprived, SIMD1 and SIMD5 is significant and increasing.  Indeed in 2013/14 SIMD2-5 were all
fairly similar in relation to no developmental concerns but the variation in performance among the
more deprived areas has widened over subsequent years.

Page 31

30
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
During 2022/23 work has been ongoing to improve the processing, assessment and monitoring of
pregnancies, in particular for the most vulnerable women. To begin this process, a Standard
Operating Procedure (SOP) has been refreshed and agreed and communication with partner
agencies improved.  The aim of this SOP is to ensure that West Dunbartonshire Children and
Families team identify a named Health Visitor for all woman going through the Special Needs in
Pregnancy process with a pregnancy which is thought to be a vulnerable pregnancy.  Impact 
measures are being planned to evidence effectiveness of service delivery.  
There is also recognition of a need to improve communication processes between Adult Addiction
services and Children's Nursing services particularly in relation to the sharing of parental
assessments of care.  By sharing assessments and resulting actions it is hoped that a holistic
assessment of parental capacity will be developed which will improve service delivery to some of
our most vulnerable children.  To support improved effectiveness of service delivery a Standard
Operating Procedure has been developed and agreed and it is hoped that in the near future the data
collected will enable further interrogation of the impact of this information sharing.
Sharing of information to promote safety of children and young people and build a scaffolding of
support around them, is a common theme running through a number of Scottish Government
documents.  Getting it Right for Every Child promotes lawful, fair and proportionate information
sharing, complying with relevant legal requirements, The Promise, National Guidance for Child
Protection in Scotland and the United Nations Convention on the Rights of the Child all contribute
to a continuum of preventative and protective work.
The Parental Capacity, Strengths and Support Assessment aligns to these guiding principles and
supports a greater understanding of trauma, disability or other complex issues which may inhibit,
limit or otherwise impact on the ability of an adult caregiver to provide safe, nurturing care to  
children and young people.
 
The assessment tool therefore provides a structure within which adult services practitioners will
review areas of strength or potential vulnerability in respect of the provision of care to children and
young people by adult caregivers seeking support, in the context of a relationship which addresses
need, facilitates support, identifies vulnerability and acknowledges strengths.
The Health Visiting Pathway is key in attempting to tackle these health inequalities.  Health Visitors
work with families to support uptake of immunisations and encourage breast feeding.  Early
2022/23 statistics show some improvement in breastfeeding rates with West Dunbartonshire.
The HSCP's UNICEF UK Baby Friendly Gold Award was revalidated in September 2022.  The award
promotes safe, effective person-centred care to support parents with up-to-date evidence-based
practice regarding infant feeding, relationships and brain development.  There is continuing work to
ensure standards are maintained and support to families is provided at Gold standard.
Childhood immunisation rates in West Dunbartonshire continue to be high.  West Dunbartonshire is
higher than both NHS Greater Glasgow and Clyde and the Scotland figure for all immunisations at
24 months of age and for 4 out of 5 of immunisations at 5 years of age.

Page 32

Development of HSCP Strategic Plan 2023-2026
The HSCP is required to publish its Strategic Plan every three years unless prevented to do so by
extenuating circumstances.  Along with numerous other HSCPs, West Dunbartonshire HSCP Board
agreed to postpone the publication of its Strategic Plan by one year due to the impact of the COVID-
19 pandemic.  In addition to responding to and beginning to recover from the pandemic, this time
allowed the HSCP to consult widely on its Strategic Plan for the 2023-2026 period which, having
been supported by various governance infrastructure, was approved by the HSCP Board in March
2023. 
 
In the development of the plan the HSCP undertook three rounds of consultation.  The first round
involved sharing our Strategic Needs Assessment with over 60 stakeholders via numerous
workshops.  Among other things, the Strategic Needs Assessment provided local demographic data,
morbidity and mortality rates, burden of disease data and various other incidence and prevalence
statistics. 
31
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Stakeholders, including the HSCP Strategic Planning Group,
were invited to combine this with their own expertise and
experiences while taking cognisance of the achievements of
the previous Strategic Plan, and suggest what the HSCP
priorities ought to be for the forthcoming plan.  This helped
develop a plan that combined continuity with change,
building and drawing upon previous success while
identifying the challenges ahead.  Suggestions from this
round of consultation were used to shape a first draft of
the Strategic Plan. 
This draft was then consulted on via various methods including online surveys, face to face and
online interviews, and focus groups with staff, service users, patient groups, carers, third sector
representatives, communities of interest and communities of geography.  This round of consultation
included asking, “What matters to you about health and social care services in West
Dunbartonshire?” ensuring the Strategic Plan would be anchored to stakeholder priorities.  Analysis
of these engagement opportunities directly shaped the subsequent draft of the Strategic Plan. 
Finally, the HSCP engaged with a similar range of stakeholders on a proposed final draft of the
Strategic Plan and continued to engage with feedback to refine further the final draft. 
 
As a consequence of extensive engagement, effective use of data, identifying where the HSCP is
performing well and where it requires to improve, the HSCP is confident its Strategic Plan for the
period 2023-2026 has been developed collaboratively, reflects stakeholder priorities and identifies
the challenges as well as the opportunities to deliver our new strategic outcomes in the areas of
Healthy, Equal, Safe and Thriving, and Caring Communities. 
Healthy Equal
Safe &
Thriving
Caring
Communities

Page 33

Self-Directed Support
Priority 2: Access
The Social Care (Self-Directed Support) (Scotland) Act 2013 requires public bodies to give people
more say in decisions about local services and more involvement in designing and delivering them.
SDS embodies the principles of participation, dignity, involvement, informed choice and
collaboration and that social care should be provided in a way that gives individuals and their
carers choice and control over their own lives, respecting and promoting human rights.
32
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Self-Directed Support
Option 1: You choose to receive a direct payment to purchase
support yourself. You will have access to advice and support
from the HSCP
Option 2: The HSCP give you the option to choose your own
support while it holds the money and arranges the chosen
support on your behalf
Option 3: You choose to have the HSCP select the appropriate
support and arrange it for you
Option 4: A mix of options 1, 2 and 3 for specific aspects of
your support
Following the approval of the HSCP’s newly developed Self-Directed Support Policy in March 2022,
during 2022/23 the HSCP have continued to build on the significant work undertaken to deliver and
maintain a consistent approach to Self-Directed Support (SDS).
The HSCP appointed an SDS Lead in June 2022 to drive forward our improvement work.  Since
coming into post the SDS lead has focused on two main areas:
An SDS ilearn module was updated and released in October 2022 and is available via the iLearn site
for staff who require an overview of SDS or to refresh their knowledge of this. The SDS Team have
also been delivering two hour overviews of SDS focusing on the values and principles that underpin
this legislation and how we approach this through our My Life Assessment in West Dunbartonshire.
The SDS Lead has created an SDS Training Matrix that is due for launch and will allow staff to
access a calendar of training on all areas of SDS including SDS and Carers, SDS and Technology
Enabled Care and Person Centred Support Planning.
Development of training and support for practitioners to help build confidence and knowledge
around SDS legislation and how to embed a person centred approach into practice.
Development of stronger links with community assets that support work around early
intervention, prevention and self management for service users and their carers and open up
choice and control around meeting assessed outcomes.

Page 34

Staff can access an SDS Clinic for one to one coaching around any aspect of SDS.  These clinics run
twice a week, one at each end of the authority, and have been well attended. Staff are attending for
support with more challenging cases or to build their confidence and knowledge of SDS legislation
and how to embed these values and principles into practice. SDS officers take a “critical friend”
approach to engaging with staff.
Four staff members are currently completing Train the Trainer with Helen Sanderson Associates to
allow Just Enough Support training to be rolled out across the HSCP and to the wider community
from September 2023. This training empowers practitioners and service users to coproduce person
centred support plans that proactively explore alternatives to paid support, promoting meaningful
outcomes that encourage service users to take more control of their care and support.
In September 2022 the Scottish Government published an updated SDS Framework of Standards that
gives all local authorities an overarching structure for further implementation of the SDS approach
and principles.  New SDS national guidance was released in November 2022 and work is ongoing to
ensure this fits with our local SDS guidance.  A new national improvement plan for SDS is due for
release imminently and on release the HSCP will align the local SDS improvement plan to this
document.
33
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Partnership Working With The Community
An SDS Circle and a Provider Network have both been established to build stronger working
partnerships and strengthen communication with the HSCP.
SDS Circle works with key community partners such as Shopmobility, Carers of West
Dunbartonshire and the Big Disability Group and operates every eight weeks.  It is an open forum
to share projects and updates from each organisation so we can all work together more
cohesively.
The SDS Circle aims to support further development of community assets across West
Dunbartonshire that will offer more choice and support to SDS budget holders as well as
creating a support network for those who do not meet eligibility criteria for formal support from
the HSCP.
The Provider Network is open to all service providers on our framework and is focusing on
building stronger communications with our providers, helping build understanding around
person centred approach to support planning and gaining a better awareness of where we have
challenges with service delivery.

Page 35

Supporting Carers
The HSCP recognises the invaluable contribution made by unpaid carers within our community,
particularly during the pandemic. In the 2011 UK Census 9,637 people in West Dunbartonshire
identified as carers and 18.2% of these carers were aged 65 and over.
The Carers (Scotland) Act came into force on 1st April 2018 and is designed to promote, defend and
extend the rights of all carers, both adult and young carers. It aims to better support all carers with
their own health and wellbeing and help make caring roles more sustainable.
December 2022 saw the publication of Scotland's National Carer Strategy which 'seeks to ensure
that unpaid carers can provide the best possible care, supported by a system that recognises and
values their contribution, allowing them to lead a full life in addition to their caring role'.  The
strategy also highlighted that while caring can be a positive and rewarding experience and can
have a positive impact on wellbeing, caring can also be associated with poor psychological
wellbeing and physical health.  Significantly, those in the most demanding care situations,
providing higher levels of care over an extended period, tend to experience the most negative
impact on their health and wellbeing.
The HSCP is committed to ensuring carers are supported wherever necessary to reduce any impact
caring may be having and, when working with carers to support a cared for person, carers will be
considered equal partners.  To this end, in April 2022 the HSCP Board introduced a number of
changes to how carers in West Dunbartonshire can be supported.  These changes included a new
Adult Carer Assessment and Support Plan, eligibility criteria for adult carers and a new process for
how newly identified adult carers can access different support. 
Eligibility criteria is about ensuring equitable access to the right services, at the right time and for
the length of time required and ensures staff from all agencies are clear on which services and
organisations are best placed to support carers, proportionate to the level of impact caring may be
having. 
The new process means Carers of West Dunbartonshire effectively become the front door to all
carer support in the area.  All carers will be offered an Adult Carer Assessment and Support Plan by
Carers of West Dunbartonshire who will then look to provide support via universal and community
based services and, where caring is having a considerable or critical impact upon the carer, they
will be referred to and supported by the HSCP.  This means those needs which can be met by
universal services can be accessed while referral to the HSCP is underway.  Those carers referred to
the HSCP and assessed as appropriate will be able to access Self-Directed Support in their own
right.  Early indications suggest that the new approach is benefiting all stakeholders.
Another significant piece of work during 2022/23 was the proposed pilot of streamlining access to
SDS Option 1 (Direct Payments) for carers to specifically access Short Breaks.  The HSCP Board
approved the allocation of £266,000 for this pilot in May 2022 however, a number of issues
including infrastructure support prevented this pilot from being implemented as intended.  While
the HSCP has not yet been in a position to deploy the pilot, the need amongst carers for Short
Breaks has not dissipated.  In order to try and meet at least some of that demand, £50,000 of the
allocation for the pilot was allocated to Carers of West Dunbartonshire to be accessed by carers for
Short Breaks via their Out of the Blue Service.
34
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023

Page 36

35
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Carer A is 64 years old and cares for her husband who has dementia.  She has been caring for
several years following his diagnosis and during that time has found her caring responsibilities
have increased and her role as her husband’s carer has become more demanding.
Carers of West Dunbartonshire prepared an Adult Carer Assessment and Support Plan with Carer
A which highlighted that her caring role was having a considerable impact on her emotional
well-being, life balance and living environment.  This was primarily due to her being unable to
leave her husband at home alone.
During the assessment process, she reported that she was becoming increasingly isolated and
felt disconnected from friends and family and was regularly missing out on social opportunities. 
As the impact of caring on Carer A was assessed as Considerable in one or more life areas, it
meant that she met the threshold for appropriate HSCP support.
A referral was made to West Dunbartonshire HSCP for Carer A to be assessed for a carer’s budget
which would allow her to have a break and life alongside caring.  In addition to this Carer A was
able to access universal support from Carers of West Dunbartonshire. This was provided through
the organisation’s Out of the Blue service.
Out of the Blue is a service which helps carers have a life alongside caring by offering support in
the form of replacement care.  It gives carers who are unable to leave the person that they care
for the opportunity to attend social events, take part in hobbies and ensure they are managing
their own health needs by being able to attend medical appointments.
Carer A was provided with 2 hours of replacement care per week which she used to attend her
exercise class.  This helped her stay physically fit and meant she could see friends again which
has had a positive impact on her mental well-being.
As a result of the referral to West Dunbartonshire HSCP, Carer A was provided with an allocation
of respite nights as well as 6 hours per week of replacement care at home.  This now enables her
to sustain her caring role as she gets regular breaks which she uses to look after her own health.
Case Study: Support to Carer
What is Carers of West Dunbartonshire Valued Carer Card?
Unpaid carers are at the heart of what we do, and in a post-pandemic world, we wanted to
find a way to support both carers and our wider community alike. The Valued Carer Card is a key
part of our Carer Aware Communities work which aims to raise awareness and support for
unpaid carers within West Dunbartonshire, while also helping to sustain community spirit and
show support for our local, independent businesses.
 
Anyone who is registered with Carers of West Dunbartonshire will receive a Valued Carer Card.
Since the initiative was launched in July 2022, over 2,000 cards have been distributed. The card
acts as a form of identification, while also unlocking discounts, promotions and unique services
provided by local businesses. Businesses and organisations supporting the Valued Carer work
have the opportunity to complete Carer Awareness Training which highlights to them who
unpaid carers are, the challenges faced by unpaid carers, and what we, as a community, can do
to support those looking after a loved one.
Valued Carer businesses throughout the local area are being included all the time and can
identify themselves by displaying the “We Value Carers” window sticker and being included in
our Valued Carer Directory, where more information about the business and the support they
offer can be seen.
Most recently, we have been delighted that West Dunbartonshire HSCP has shown its support to
Carer Aware Communities by encouraging any services procured by it to take part in Carer
Awareness training. For carer and business enquiries about Valued Carer, please contact Jenni
McNab, CWD Marketing and Engagement Officer on 07535469592 or email jenni@carerswd.org

Page 37

36
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Scotland must provide the best possible services for people with a learning disability to enable them
to lead high quality lives within their family and/or their community where they experience
personalised support consistent with a Human Rights Based approach.  A priority within the national
strategy the Keys to Life is that all adults with learning disabilities, including those with complex
needs, experience meaningful and fulfilled lives.  This includes where individuals live, as well as the
services they receive.  The Scottish Government's vision for people with learning disabilities and
complex needs is that everyone is supported to lead full, healthy, productive and independent lives
in their communities, with access to a range of options and life choices.
The Coming Home Report, published in November 2018, identified that some people with learning
disabilities and complex needs were living far from home or within NHS hospitals and that there
was an urgent need to address this issue.  The Scottish Government commissioned a two-year
project to look specifically at the support provided to people with learning disabilities who have
complex needs.  The focus of the project was to identify the number of people involved and also to
suggest support solutions for individuals with learning disabilities who have complex needs: either
those placed out-of-area or those currently delayed in hospital-based assessment and treatment
units.
To support HSCPs to find alternatives to out-of-area placements and to eradicate delayed discharge
for people with learning disabilities the Scottish Government allocated a £20 million Community
Living Change Fund to HSCPs via NHS Boards in February 2021 to:
 
NHS Greater Glasgow and Clyde, through its Learning Disability Board-wide Governance structure
has set up a Programme Board to support HSCPs.  In West Dunbartonshire a review of learning
disability services, in line with organisational change policies, is being planned.  Developing and
maintaining good, sustainable accommodation and support services is crucial to meeting the
aspirations of the report and the needs of those identified.  Achieving this requires coordinated effort
and alignment of resources locally to create the capacity to achieve progress against the strategic
objectives of the Community Living Change Fund.
One of NHS Greater Glasgow and Clyde's sub-groups ‘Future Landscapes’ is working with third sector
and housing colleagues to recommend new sustainable models of support ensuring a co-production
approach in terms of how services should be designed and developed.  In addition to directly
impacting people with learning disabilities, this work will also impact on services and how these are
planned and commissioned.  It will support better local long-term planning to meet the housing and
support needs of individuals with complex needs including the formation of specialist
multidisciplinary teams that are focused on providing the necessary services and support in the
community to prevent admission to hospital as well as the proactive development of appropriate
housing. 
Sharing of best practice and a culture that promotes open and frank discussion about the ongoing
challenges, such as the role of a Registered Social Landlord,  compared to the role of a specialist
care provider, is vital. It is hoped that in collaborating across the 6 HSCP areas comprising Greater
Glasgow and Clyde, greater momentum will be achieved in developing and delivering services to
people with learning disabilities and very complex support needs to ensure improved outcomes for
those individuals and their families.
The Learning Disability Team within West Dunbartonshire comprises a considerable integrated
workforce of both NHS and Council staff within statutory, registered, supported employability,
transition and respite services.  The team includes social work,  psychiatry, psychology, nursing,
occupational therapy, physiotherapy, speech and language therapy as well as dietetics. 
The Covid-19 pandemic has continued to have an impact on people with a learning disability and
their access to services during 2022/23 with a higher number of deaths than any other group within
the wider population as highlighted by University of Glasgow studies.  There are 404 people with a
learning disability in West Dunbartonshire who are known to, or receiving, HSCP services and a
further 24 people living outwith West Dunbartonshire whose support is funded by the HSCP.
Reduce the delayed discharges of people with complex needs
Repatriate those people inappropriately placed outside of Scotland
Redesign the way services are provided for people with complex needs
Learning Disability Services

Page 38

37
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
The HSCP's registered Housing Support Service (HSS) provides supported living to people with a
learning disability to live as independent a life as possible.  HSS work with those supported in a
person-centred way to develop personalised, outcome-focused support plans.  This includes support
with the following areas of everyday life: personal care, developing independent living skills,
maintaining important relationships, remaining healthy and accessing healthcare services.  HSS also
offer support in being able to take an active role in local community life, identifying and accessing
leisure opportunities and with all aspects relating to maintaining tenancies and being a good
neighbour.
Outcomes for those supported are varied and personal, however include improving feelings of
security, increasing inclusion, reducing social isolation, reducing risk and vulnerability and improving
health and wellbeing.  Staffing across all sites remains a challenge and, as the needs and complexity
of those being supported changes, the way in which the service is being delivered will require to be
reviewed in line with HSCP policies to ensure it is meeting the needs of those highlighted in the
Coming Home Implementation Report.
Dumbarton Centre is a registered service providing day support for adults with learning disabilities
with more complex support needs, be it physical or behavioural.  Currently the centre provides
support to 33 individuals over the course of a week.  This involves an increased number of one-to-
one and two-to-one supports than pre-Covid.  The centre provides a range of activities within the
building as well as some community-based opportunities.  In addition Rebound Therapy has been
arranged through physiotherapy and clinics run on a Wednesday and Friday afternoon including for
service users who previously accessed this therapy when attending the centre.
The complex needs of some of the individuals identified through Transitions who require a building
based service, has required a review and refresh of specialist training provided to staff.  NHS Greater
Glasgow and Clyde supports a Positive Behavioural Support (PBS) postgraduate course for those
working with complex, challenging behaviour.  One member of staff has already completed and
another is currently undertaking the course.  In conjunction with psychology, this will ensure that
those individuals with challenging behaviour will have detailed PBS plans in place, in addition to
any Promoting Positive Behaviours interventions required, prior to commencing a placement at
Dumbarton Centre to mitigate risk as much as possible.  Work will be ongoing to upskill staff to work
with individuals who will require a building-based service in the future.
Community Connections is a dual registered service providing community-based support for adults
with learning disabilities who do not require the resources available within a building-based service.
It currently supports 37 clients with a variety of specialist needs between the hours of 7am and 9pm
to suit the support required and can provide home support if this is identified by the referrer. 
Similar to Dumbarton Centre it provides support to achieve the Keys to Life outcomes within the
Scottish Learning Disability Strategy.  The service accesses various community-based services and
groups according to the outcomes identified in each personalised support plan and delivers both
one-to-one and group support according to assessed need. 
Work Connect is a non-registered specialist supported employability service that work with adults
with learning disabilities, mental ill health, addictions and autism.  The service supports individuals,
if appropriate, and in line with eligibility criteria, to access mental health, addiction or learning
disability services and also welfare and debt advice, if required, to overcome challenges in accessing
supported employment or volunteering opportunities.  The expectation is that participation will lead
to an increase in the skills and confidence of those accessing any of the programmes offered by the
service, such as horticulture or catering, leading to increased opportunities for training, volunteering
and entry to employment including in-work support. It works in partnership with a number of
agencies to access different funding streams and is keen to develop a Hub model to provide a range
of supports to those transitioning to adult services.
Carers accessing the Respite/Short Breaks service require help and support to maintain their caring
role.  Practical, emotional and physical support is required by many carers in addition to respect,
dignity and compassion.  Historically the majority of carers have preferred the cared for person to
access residential respite/short breaks for weekends or a week to enable the carer to go on holiday
or have a break themselves.  Work is currently underway to explore a range of options to develop
how respite and short breaks are offered in the future.  A short break is classified as any form of
support that enables the carer to have a break from their caring role and can take the form of a
menu of options such as: short breaks/holidays; overnight residential respite; support within the
home or community for the cared for person; payment for activities; urgent/unplanned respite or
accommodation to provide replacement care.  Being able to offer this service leads to improved

Page 39

38
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
outcomes for carers such as: time to pursue personal interests leading to a balance with caring
responsibilities resulting in improved health and well-being; greater independence and self-
confidence; greater ability to sustain the  caring role and improved relationships with the person
being cared for and their wider network of support.
 
West Dunbartonshire HSCP is fortunate to have a very well respected building-based respite service
run by a third sector provider.  Post-Covid, having been granted a variation to its Registration by the
Care Inspectorate, the service now offers two emergency placement beds as well as four respite
beds.  This is a vital service, in line with the Coming Home Implementation Report, to better support
the vulnerability of community-based placements to prevent placement breakdown or hospital
admission.  Learning Disability Services currently have 95 carers who have been assessed as
requiring respite/short breaks. Throughout the pandemic, the Learning Disability Respite/Short
Break Service continued to provide essential supports and services to carers, families and those in
need as did Dumbarton Centre.
 
West Dunbartonshire Learning Disability services continue to work hard to promote and support the
rights of people with a Learning Disability.  A more fully staffed health team has seen a reduction in
waiting times and a more timely service.  There has been substantial work done to review processes
creating much safer and more robust processes in relation to patient care and clinical governance.
Successful implementation of anti-psychotic monitoring clinics has identified some unmet health
needs and directed carers to other services, which may not have happened otherwise.
Learning Disability nursing staff have maintained additional responsibilities in relation to the Covid-
19 vaccination programme including directly vaccinating those individuals supported by Learning
Disability Services who were unable to attend public vaccination centres.  The recruitment of two
Health Support Workers has provided capacity for clinical activity to support the work of the Coming
Home Implementation Report and the increased complexity of Transitions.
There is ongoing work with Children and Families to review Transitions to adult services to ensure
we are applying the HSCP's eligibility criteria and providing a statutory service to those with critical
or substantial need.
The Learning Disability Team does a huge amount to support student education both at
undergraduate and postgraduate level across a wide range of professions.  This takes time and
energy to ensure the placements are meaningful and positive and the team should be congratulated
on its ongoing commitment to this in addition to caseload pressure. One of our health team has
been selected to pursue a doctorate in an area of research specific to learning disability and we are
delighted our service users may benefit from this work in the years to come.
This year we again took time to listen.  By understanding what is important to our staff and service
users we can build more supportive, effective relationships, which will hopefully lead to improved
quality and effectiveness of care and outcomes for people with learning disabilities. The service
recognises the passion and commitment of staff to work alongside service users and their families to
support individuals to meet their outcomes and supports staff to be the best they can be in
continuing to develop their own knowledge, skills and abilities to create a workforce, and specialist
teams, fit for the future that can meet the complexity of demand with a finite set of resources.
There is much to be positive about, in spite of ongoing challenges around recruitment and retention
of staff, particularly within third sector partners, the resource required to deliver organisational
consultation and change and the reporting requirements linked to Dynamic Support Registers and
complex Adult Support and Protection work.  Communication and a readiness to embrace change are
key ingredients for success and the HSCP is committed to working in partnership with all
stakeholders to ensure real and meaningful engagement with people with a learning disability and
their families to enable them to lead high quality lives within their family and/or their community
where they experience personalised support, enabling greater independence, choice and control and
the ability to have a healthy life and be an active citizen, consistent with a human rights based
approach.

Page 40

39
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Justice Services have continued to provide support, interventions and monitoring to those subject to
statutory orders and licences.  There are clear governance structures around the Justice Service
internally via the HSCP Board, the Public Protection Chief Officers Group and West Dunbartonshire
Community Planning Partnership's  Safe Delivery and Improvement Group.  We continue to meet with
our link inspector from the Care Inspectorate and provide quarterly and annual unit returns to the
Justice Division of the Scottish Government.
During 2022-23 Justice Social Work Services experienced some notable increases in demand
compared to the previous year.  We continue to evaluate and improve our service to individuals,
responding to national strategies including the Presumption against short sentences.  The
operational management team has been extended from funds from Scottish Government.  As an
integral part of the service, this will strengthen oversight of best practice and accountability to the
senior management team.
Performance in meeting targets for Social Work Reports, Community Payback Orders and Unpaid
Work Orders timescales have continued to be challenging during the year.  There were 827 Social
Work Reports completed in 2022/23, an increase of 4% on 2021/22.
Justice Social Work Services
Community Payback Orders increased by almost 15% on the previous year and those with unpaid
work requirements increased by just over 16%.  Collaborative work with the Council’s Greenspace
project and colleagues from the Knowetop Alternatives project contribute to the local authority’s
green space initiatives.  Third sector partners the Wise Group provide additional support
opportunities and the Red Chair Project ensures service users are not disadvantaged in terms of
digital poverty.
 
Having secured a new workspace for the unpaid work team, employability services attend there to
enable delivery of a wider range of supports and learning. The service has returned to pre-pandemic
levels of service delivery, with additional Covid monies from Scottish Government securing extra
staff to facilitate this.
 
Staff continue to provide specialist Justice monitoring and supervision to those on community orders
or licences, utilising their skills in risk assessment and individualised intervention programmes to
enable service users to address the cause and effect of their offending behaviours on themselves,
families and communities.
The new Bail Assessment and Supervision Service commenced at Dumbarton Sheriff Court in
September 2022.  To date, the service has supported 15 individuals remain in their local community,
reducing the negative impact of remand on the individual and their families.  In addition the
provision of services to individuals prior to their release from custody and into the community
continues to support successful reintegration into the service users’ local communities.

Page 41

40
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
During 2022-23, Diversion services were provided to 37 people who had not been convicted of an
offence, supporting them not to become further entrenched in the justice system. Individuals were
supported to address the underlying cause of their behaviours such as addiction support, mental
health alongside difficulties with emotional wellbeing, housing, income maximisation and
employability.
The Drug Treatment Testing Orders service continued to be provided by an integrated care team
hosted by West Dunbartonshire and working across West Dunbartonshire and Argyll and Bute to
support individuals whose offending is primarily due to their established addiction issues,
encouraging recovery, reduced offending behaviour and promoting stability.
A number of improvement actions were completed during 2022/23 including:
 
 
Challenges have included:
Our strengths include:
 
New staff being trained and existing staff annually updated on the suite of assessment tools used
within Justice Social Work.
Staff training being completed in Trauma Informed Practice.
Throughcare Assessment for Release on Licence –West Dunbartonshire staff having being trained
in the first delivery of this tool.
Ongoing negotiations with the National Caledonian Team to bring Caledonian Domestic Abuse
group work to West Dunbartonshire.
Additional Government funding has enabled the service, to provide additional capacity alongside
further support in the additional provision of services to our local courts including bail
supervision and structured deferred sentences as an alternate disposal.
The annual funding model restricts our ability to plan and sustain services beyond the current
financial year, including services commissioned from the Third Sector.  This means we are only
able to enter into short-term contractual arrangements, which creates difficulties in both the
recruitment and retention of suitably qualified staff. Justice Services do not have the ability to
reduce demand on our statutory services therefore a robust funding model is essential.
High numbers of Domestic Abuse offending within the local authority: staff are listed to attend
national training on the Caledonian system.
Referrals from the Crown Office and Prosecution Service (COPFS) have significantly increased. In
line with national policy of early intervention, the service has seen an increase in those subject to
diversion in sustained attempts to reduce the number of individuals going through the criminal
justice system.  We continue to have regular meetings with the COPFS service through the local
community justice forum.  
Horizon scanning to anticipate the impact on Justice Social Work from the Children’s Care and
Justice (Scotland) Act, alongside the forthcoming Bail and Release Act, currently passing through
parliamentary approval.
Strong partnership working evident in the planning of support for individuals being released from
prison.  Our Justice and Housing Services are working closely together to ensure short stay
accommodation is identified for individuals prior to release and support then provided to access a
permanent tenancy.
 
Positive working relationships with Police Scotland colleagues in the management and support to
those assessed as posing a high risk of re-offending.
During 2022/23 we have enhanced our unpaid work service by ensuring that tasks are meaningful
to communities and provide learning opportunities for service users, including improving the
environment and supporting charitable and voluntary organisations.

Page 42

41Annual Performance Report 2022/2023
The West Dunbartonshire Adversity, Trauma and
Resilience Programme aims to prevent childhood
adversity and trauma and to mitigate the effects across
an individual's life course where it has already occurred.
A key component is to develop a trauma-informed West
Dunbartonshire through supporting workforce
development across public and third sector organisations.
West Dunbartonshire Health and Social Care Partnership
Priority 3: Resilience
Adversity, Trauma and Resilience
This is in line with the National Trauma Training Programme and West Dunbartonshire
Council's commitment to support the Wave Trust's 70/30 campaign to reduce child abuse,
neglect and other adverse childhood experiences (ACEs) by at least 70% by the year 2030
which the Council reconfirmed its original 2021 commitment to in 2023.
Locally the programme seeks to cover the five drivers of change of trauma-informed systems:
This will be done through Trauma Training plans, including Resilience Film viewings, to
support the development of a trauma-informed workforce supported by the Resilience Hub
which is a community of practice with over 500 members.
The Resilience Hub held one online meeting in 2022/23 themed on 'Developing your Trauma-
informed Practice' and 58 people participated.  It showcased the range of free training
resources available from the National Trauma Training Programme as well as how some local
teams within Education and Blairvadach Children's House have put this into practice.
Joint work with the NHS Greater Glasgow and Clyde Transforming Psychological Trauma
Implementation Coordinator included focused leadership work with leaders working in
Children's Health, Care and Justice, with 40 leaders attending the national Scottish Trauma-
informed Leadership Training.
A training needs analysis was carried out for the Children's Health, Care and Justice workforce,
exploring awareness and attitudes to psychological trauma and trauma-informed
practice based on the National Trauma Training Programme Workforce Survey 2021, to allow a
learning and development plan to be developed.  Staff working in the Older Adults' Mental
Health team also completed the Opening Doors Session on trauma-informed practice.
Leadership and management
Experts by experience
Data and information
Workforce knowledge and skills
Workforce wellbeing

Page 43

42Annual Performance Report 2022/2023
All staff working in the HSCP's Children's Houses have accessed training in the Dyadic
Developmental Psychotherapy (DDP) approach.  This approach encourages working with young
people, their families and/or other key people involved in their care.  It raises awareness of
trauma and its impact on young people’s development and how this might affect their
behaviour, and supports staff to interact and talk with young people with this informed
approach.  It highlights use of a PACE approach in interactions i.e. to be:
To support this over a hundred staff across WDC Education, including Educational Psychology,
and HSCP Children's Social Work have accessed a Level 1 DDP learning opportunity.  Managers
have also accessed training in how to bring these approaches to supervision.
The Resilience documentary film about Adverse Childhood Experiences continues to be an
additional popular resource to increase ACEs awareness.  One online viewing was held in
2022/23 as part of West Dunbartonshire World Kindness Day activities with 58 people
attending.  Knowledge and understanding of ACEs increased from 2.84 to 3.84 out of 5 across
the audience after viewing the film and taking part in a discussion.
Playful - to allow us to attune and match young people’s mood and emotions
Appreciative - of the young person’s point of view and what they are telling us about how
they feel
Curious - to wonder why a young person feels the way they do, or wonder what their
behaviour is really telling us
Empathetic - to really try to understand how young people are feeling
West Dunbartonshire Health and Social Care Partnership
“I'm a student social worker and I have learned about trauma, ACEs and health at
uni. Since starting placement, I have been trying to apply the knowledge I have
but it has been difficult at times to transfer it to practice. I found the film really
helpful for bridging that gap between theory and practice.”
Two face to face viewings of the Resilience film were held in 2022/23.  One viewing was held
in partnership with the co-ordinated Community Response Network set up by West
Dunbartonshire Clydesider, a community media social enterprise, with a view  to build capacity
and understanding of trauma with a range of third sector organisations and building on the
message in the film that:
'If you can get the brain science into the hands of the general
population, they will invent very wise actions.'
To continue to build connections with The Promise, a focused viewing for foster carers, kinship
carers and adoptive parents was held in March 2023. Feedback was positive for both viewings
with requests for more viewings across West Dunbartonshire.  This brings the total number
who have seen the Resilience film to approximately 1,280.
Work has been undertaken during 2022/23 to refine a local evaluation framework based on the
draft Improvement Service Creating Trauma Informed Change: What, Why and How, A Quality
Improvement Framework for Trauma-Informed Organisations, Systems and Workforces in
Scotland to develop the understanding of the impact of this work and this will continue in
2023/24.

Page 44

43Annual Performance Report 2022/2023
Adult and Older People Mental Health Services received 4,456 referrals and offered 29,895
appointments in 2022/23, providing health and social care to a range of people with varying
mental health needs.  Referrals have increased by 9% within Adult Mental Health  and 8.8% in
Older People Mental Health Services.  There is a noted increase in referrals for people with a
provisional diagnosis of Attention Deficit and Hyperactivity Disorder (ADHD).  This is in line
with the NHS Greater Glasgow and Clyde experience of a 700% increase in referrals for ADHD
since 2019.
 
During 2022/23 there have been a number of service developments across Mental Health
Services which continue to offer contact using a variety of different methods including use of
NHS Attend Anywhere digital video platform which was implemented locally as a response to
the Covid pandemic. 
 
We have completed the recruitment of Wellbeing Nurses within all GP practices across West
Dunbartonshire which allows direct contact with a mental health nurse without the need for a
GP assessment.  Wellbeing Nurses continue to work alongside Community Link Workers to
deliver brief interventions to people with mental health and wellbeing needs.
 
We successfully recruited and rolled out a Specialist Physical Health Nurse service expanding
this year to all Adult and Older People Community Mental Health Teams.  This means that
anyone who does not have an annual review for physical health care within primary care
services, and is prescribed anti-psychotic medication, has the opportunity to have a range of
tests, advice and treatment changes.
We have also fully recruited to and rolled out a Mentalisation Based Therapy Nursing Service
for people with emotionally unstable personality disorders.  These additional staff support our
Adult Community Mental Health Teams to deliver enhanced pathways of care.  This has
reduced the number of admissions to both our Mental Health Crisis Team and our inpatient
services. 
 
The Mental Health Social Work Service has supported the development and introduction of the
wider HSCP Adult Support and Protection duty system and Area Resource Group and we are
increasing the number of practice assessors and student link workers through additional
training.  Social workers have ensured that all clients have an established review date using
principles of self-directed support to ensure all care packages meet the eligibility criteria for
adult social care services. 
 
Mental Health Services have also supported the Vale of Leven Hospital to open their Dementia
Garden on the hospital site.  We contributed staff and volunteers through our Work Connect
Employment service to establish this outdoor space for patients, and their carers, of the HSCP
Dementia and Functional Wards.
Local Mental Health Inpatient Services have introduced new ways of supporting people with
dementia.  This includes stress and distress models of care, psychological formulation of
distressed patients,  cognitive stimulation therapy and Occupational Therapy Allsorts activity
programme.  Occupational Therapy within the Older People's Mental Health Team have also
introduced a new service where the Occupational Therapists now assess the ability of people
with dementia to be able to safely drive motor vehicles.
 
Consultant Psychologists have developed a training plan for all adult mental health care staff
in West Dunbartonshire that will see a pathway for all new nursing staff that ensures an
ongoing training programme in the latest evidenced-based psychological therapies.  This
includes the establishment of Trauma Focused, Safety and Stabilisation Training for all staff. 
 
West Dunbartonshire Health and Social Care Partnership
Adult and Older People Mental Health Services

Page 45

44Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
MSK Physiotherapy
Musculoskeletal (MSK) conditions continue to have a major impact on people's lives. It is one of the
leading causes of time off work and more years are lived with an MSK disability than any other
condition.  The MSK Physiotherapy Service continues to provide a person-centred approach where
each person is individually assessed and their bespoke care is focused on symptom management,
movement, exercise and supported self-management.  As we help patients to recover and return to
normal activities, we also encourage them to take up more active and healthy lifestyles.  In addition
we focus on health improvement and support patients who have wider health needs, for example 
who require support on issues such as alcohol, smoking, weight management or stress management,
by signposting them to appropriate services.
Despite the challenges of remobilisation post pandemic, the service had a year of success with
regards to delivering 6 priority objectives. The service priority objectives were:
There has been a huge focus on service performance during 2022/23, in particular with a priority
project to reduce both routine waiting times and the number of patients waiting for a routine
appointment, both of which increased over 2021/22 due to redeployment of staff to support the
pandemic effort. The data for 2022/23 shows a downward trend in both maximum routine waiting
times and the number of patients waiting for a routine appointment in 2022/23. 
Waiting times
Recruitment and retention of staff
Staff wellbeing
Introduction of Electronic Patient Records/Active Clinical Notes.
Streamlining MSK pathways of care and shared decision making for patients with Osteoarthritis of
hip/knee
Training, education and staff development towards best patient care
The data for 2022/23 across the board-wide Greater Glasgow and Clyde service shows a downward
trend in both maximum routine waiting times and the number of patients waiting for a routine
appointment in 2022/23.  Between April 2022 and March 2023 the maximum wait for a routine
appointment halved, reducing from 24 weeks to 12 weeks while average waiting times reduced from
76 to 44 days.  Average waiting times decreased despite increasing referrals and numbers of people
waiting for a routine appointment reduced from 17,151 in April 2022 to 13,540 at the end of March
2023.
Priority 4: Assets

Page 46

45Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
HSCP Staff Health and Wellbeing
Maintaining a positive workplace culture that promotes and supports the health and wellbeing of
our workforce is a priority for the HSCP.  We recognise that along with embracing new styles of
working and tackling the challenges of digital technology, mental health and wellbeing issues have
the biggest impact on our workforce.  We put people at the centre of everything we do and work to a
common set of values which guide the work we do, the decisions we take and the way we treat each
other.  Our vision and values are firmly rooted to provide good, strong and reliable health and social
care to our users at the point of need.  These values represent how we do things and the expected
behaviours of people working within the HSCP.  We seek to continually embed these, ensuring that
we have a culture that drives high quality and well led services HSCP-wide.
 
A healthy, well-supported workforce is better placed to provide the very best care for our service
users.  Programmes of work across West Dunbartonshire Council and NHS Greater Glasgow and Clyde
have sought to improve and promote staff health and wellbeing while aiming to reduce sickness
absence.  Developing a range of resources to enhance the supports in place for our workforce and
receiving feedback from staff about how they feel about their work, both as an individual and as part
of a team, is crucial to developing a healthy organisational culture. The iMatter staff engagement
tool is well established as the primary source of feedback from our workforce in relation to their
experience of working within the HSCP.
 
A large proportion of HSCP staff deliver frontline services to vulnerable people while those working
remotely may have seen the lines blur between family life and work life and the stresses this can
entail.  Physical and mental health and wellbeing are interrelated which the HSCP ensures is our
focus.  West Dunbartonshire Council ran a number of wellbeing webinars during 2022/23 which were
available to all HSCP staff. These covered a number of topics including emotional resilience,
communication and neurodiversity.  In addition was the extension of Mental Health First Aiders who
work alongside Wellbeing advocates to signpost employees to supports and provide important
feedback from employees on wellbeing needs and initiatives.  Work has also commenced in relation
to the Equally Safe at Work programme to raise awareness and understanding of gender-based
violence.  Together with a number of online resources, NHS Greater Glasgow and Clyde have made
progress across the pillars within the Staff Health Strategy and have continued to develop and
implement the health and safety culture framework.
 
The National Wellbeing Hub and National Wellbeing Helpline are national initiatives which have
been heavily promoted to HSCP staff.  The helpline offers callers a compassionate and empathetic
listening service based on the principles of psychological first aid, as well as advice, signposting and
onward referral to local services if required. Coaching for Wellbeing has also been highlighted to
staff.  This is a service designed to support staff with any of the issues they may be facing during
these challenging times.  Staff are offered 2 hours of individual online coaching which includes
support in building resilience and helping individuals to take action to improve their wellbeing.
Where appropriate, staff can also explore how to lead and support others who may be struggling.
Trades Union colleagues have been helpful in promoting these services to their members and
suggesting ideas and initiatives to consider.
 
Our workforce are our greatest asset.  We take great pride in celebrating the achievements of our
staff throughout the year, culminating in the annual awards across West Dunbartonshire Council and
NHS Greater Glasgow and Clyde.  A huge effort has been made to ensure staff have the right skills,
knowledge, training and flexibility to be deployed in the right place at the right time.  We continued
to review our workforce during 2022/23 to ensure that we both recruit and retain staff across all job
families to support delivery of the HSCP strategic ambition.  We support access to opportunity for all
through our recruitment and selection processes, modern apprenticeships and internships.  We
support our workforce to progress in their careers and everyone has access to a wide range of
training and development opportunities which are available throughout the HSCP and we try to
effectively utilise individual skill sets in the most effective way.  We recognise that fulfilment is a key
part in ensuring that we have a happy and engaged workforce and encourage creativity and
innovation in our workforce and Trades Union colleagues.
 
Mutual respect is an important aspect of our relationships with our workforce and Trades Union
colleagues.  This is supported through established policies and procedures.  We strive to ensure that
our workforce feel valued in ways other than through pay or position.  Engagement with employees
at all levels in the organisation and with our Trades Union colleagues is a priority.

Page 47

46Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Child Protection
The HSCP began reporting the Child Protection Minimum Dataset to the Child Protection Committee
from April 2021. The Minimum Dataset was created by the Centre for Excellence for Children’s Care
and Protection (CELCIS) in partnership with Scotland’s Child Protection Committees, Scottish
Government, the Care Inspectorate and Scottish Children’s Reporter Administration.  It is a set
collection of agreed measurements, criteria, or categories required to create a robust understanding
of information about a service.  With historic data as far back as April 2016 where available, the
Dataset allows the CPC and its scrutiny group to explore trends, highlight anomalies and improve
services, processes and the quality of case recording.
There were 51 children on the CP Register at the end of March 2023 compared with 54 at the same
point in 2022.  There were 73 children newly registered and 75 children removed from the register
during 2022/23. The previous year saw 92 new registrations and 80 de-registrations.
The Minimum Dataset monitors the proportion of children where the decision is taken to add the
child to the CP register after an Initial or Pre-Birth Case Conference.  This is known as the Conversion
Rate and monitors the effectiveness of our processes and decision-making.   As can be seen in the
the chart below, when the line representing the number of children subject to a case conference is
close to that of the number of children registered the Conversion Rate is higher.  The Conversion
Rate in January - March 2023 was 83% compared with 65% in the same period 2022.
The Dataset also monitors the age groups of those children being newly registered.  This works out
at very low numbers which could potentially be identifiable, however the trend has been that more
than half of all newly registered children in 2019/20 were less than 5 years old and this has
decreased over time with those aged 5-10 years making up a similar proportion of new registrations
as under 5s in 2022/23.

Page 48

47Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Reasons for a child being placed on the CP register, known as concerns are also monitored and there
may be multiple concerns recorded for each registration.  In 2022/23 domestic abuse was the
highest  noted concern and was recorded in 59% of all new registrations.  This is higher than the
53% in 2020/21 which was thought to be related to Covid lockdowns.  The second highest concern
recorded in 2022/23 was non-engaging family followed by parental mental health problems and
neglect.  The chart below shows the trends for these 2022/23 highest concerns.  *Percentages for
2018/19 and 2019/20 relate to the academic year (August to July) rather than financial year.
The Child Protection process is also monitored through the Dataset in respect of meeting key
timescales and the proportion of parental attendance at case conferences.  Some of this has
identified potential gaps or delays in recording which can be monitored and improved through CPC
scrutiny.  More effective collection of Inter-Agency Referral Discussion data has already been
identified through scrutiny of the dataset and Police Scotland data is now being shared with the
HSCP.
More widely, Children's Services continued to support a high volume of children and families in
2022/23 with 1 child in 15 in West Dunbartonshire on Social Work caseloads as at March 2023.  The
service has been working to address the high number of overall referrals from partners to the current
“duty” or initial response service, and a revised model of initial response has been developed,
benchmarked against the current service uptake of new referrals to the service.  This will include a
more specific response to non-child protection referrals from partners, using the Getting It Right For
Every Child (GIRFEC) National Practice Model standards and expectations.
In addition, the service has been working with colleagues in the Scottish Children’s Reporters
administration to support better management of the high volume of report requests, specifically
developing a triage process to support decision making where a full report may no longer be
required.  This is in line with the proportionality of response, where matters have been addressed
and families do not require an ongoing multi-agency support plan.  The development of a  GIRFEC
compliant and more child focused assessment and planning format (My Assessment / My Plan) has
been implemented, alongside implementation of the Viewpoint tool for gathering the views of
children and young people. This will remain in an implementation year supporting evaluation and
quality assurance of the model across the partnership.
The service has been operating, post-Covid, in a context of increased demand and complexity as
communities both recover from Covid and are impacted by the cost of living crisis.  At present the
service is also operating in a context within which recruitment and retention of staff is increasingly
challenging.  Agency staff, where available, are being deployed across the service however this is not
an effective long term strategy.   A longer term recruitment strategy which will be attractive to newly
qualified social workers while also recruiting and retaining more experienced staff is being
developed.  As this crisis mirrors the national position, it is inevitable that the service will require to
become more competitive in this area.  This has been noted as a significant area of risk in respect of
the service capacity to meet its statutory functions at present.  Similarly, external providers are
increasingly struggling to recruit and retain social care staff.   As such we are working to reduce the
reliance on external providers by developing better local family support opportunities across the
partnership, and increasing the uptake of Self-Directed Support within, at present, the disability
service where the lack of respite and other support services has been particularly challenging.

Page 49

48
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
Keeping The Promise
Scotland's promise to care experienced children and young people is that they will grow up
loved, safe, and respected, able to realise their full potential. The Promise was developed from
the findings of the Independent Care Review which took place 2017-2022.  At the point of
concluding, the Care Review had listened to over 5,500 experiences. Over half of the voices were
children and young people with experience of the ‘care system’, adults who had lived in care, and
lots of different types of families. The remaining voices came from the paid and unpaid
workforce. It was their stories that guided the Care Review and it is their experiences that have
shaped everything the Care Review has concluded.
Children and young people who become looked after are among the most disadvantaged
children in society and in general experience poorer outcomes than their peers. Reasons for
becoming looked after vary for each child but in every case children will have been through
difficult or traumatic life experiences which can result in poor emotional and physical health,
distress, a lack of stability and often a lack of social and educational development.
The Promise will be built on the following foundations which "must be at the heart of a
reorganisation of how Scotland thinks, plans and prioritises for children and their families":
In May 2022 the HSCP appointed a The Promise Lead Officer with the remit of raising awareness
of The Promise and leading on the implementation of The Promise within West Dunbartonshire.
A Keeping the Promise sub-group was also created which reports to West Dunbartonshire
Community Planning Partnership’s Nurtured Delivery and Improvement Group. This sub-group
has multi-agency representation and met for the first time in July 2022 for a half-day
development session. The role of this group will be to support and drive forward the
recommendations of The Promise. 
Short working life groups were established from the Keeping the Promise group to look at
specific issues in more detail and enlisted membership from relevant parties. The three initial
working groups are for Continuing Care, Brothers and Sisters and Language. They report
progress to the Keeping the Promise Group, and take action to progress these priority areas.
Voice - Children must be listened to and meaningfully and appropriately involved in decision-
making about their care, with all those involved properly listening and responding to what
children want and need. There must be a compassionate, caring, decision-making culture
focussed on children and those they trust. 
Family - Where children are safe in their families and feel loved they must stay – and families
must be given support together to nurture that love and overcome the difficulties which get
in the way. 
Care - Where living with their family is not possible, children must stay with their brothers
and sisters where safe to do so and belong to a loving home, staying there for as long as
needed. 
People - The children that Scotland cares for must be actively supported to develop
relationships with people in the workforce and wider community, who in turn must be
supported to listen and be compassionate in their decision-making and care. 
Scaffolding - Children, families and the workforce must be supported by a system that is
there when it is needed. The scaffolding of help, support and accountability must be ready
and responsive when it is required.
Priority 5: Inequalities

Page 50

49
West Dunbartonshire Health and Social Care Partnership
Annual Performance Report 2022/2023
During 2022/23 there have been some key developments to ensure the voices of children and
young people are listened to and involved in decision-making. 
Viewpoint, a software tool that is used to support children and young people share their views,
has been re-introduced within West Dunbartonshire, relaunched in July 2022. Over 70 social
workers attended training provided by Viewpoint and it is available to be used with children and
young people over 5 years old in West Dunbartonshire. This supports the United Nations
Convention on the Rights of the Child, ensuring children and young people are meaningfully
and appropriately involved in decision making, and have the opportunity to have their voice
heard on decisions affecting them.
The data gathered can help ensure children and young people have their views included in care
planning and can also be aggregated to provide information on what matters to children and
young people across West Dunbartonshire and support service planning and delivery. Further
training is planned for May 2023, which will focus on supporting Senior Social Workers and the
new Independent Reviewing Co-ordinators promote and support the use of Viewpoint.
A development to Viewpoint has also just been launched with our foster carers, where we will
use the app to support the collection of life story material; ensuring our children and young
people have a coherent narrative around their childhoods now and in the future. We will be
asking our foster carers to take at least one photo per week, along with a story to accompany
the photo, to upload on the child’s app as well as being attached to the child’s file. We will also
be asking foster carers to write a letter to the child prior to every six monthly review meeting
talking about their time together, which again will be uploaded onto the app and into the child’s
file.
Children’s Activity Bags have also begun to be used within our Children and Families Teams to
help gather infant, children and young people’s views. These are backpacks filled with activities
and toys to engage infants, children and young people during time together. The goal is to
support relationship building and create a supportive context whereby children and young
people feel able to share their views and feelings.
A “Communicating with infants, children and young people” development day is planned for
later in 2023 with our Children and Families teams which will promote and develop skills, tools
and learning for supporting children, as well as thinking about how to make sure these views
are reflected in case recordings, reports, care plans and meetings.
At the end of March 2023 there were 478 looked after children in West Dunbartonshire: an
increase of 26 or 5.8%.  Of these children, 88.7% were looked after in the community rather
than a residential setting helping them to maintain links and relationships within their
community which may lead to better outcomes.  This was slightly below our local target of 90%.
In line with our equalities monitoring, we also monitor the proportion of looked after children
from Black and Minority Ethnic (BAME) communities who are looked after in the community. 
Numbers of BAME children who are looked after have been very low therefore small changes in
numbers mean percentages fluctuate more significantly. 
However numbers have risen slightly as at March 2023 and as can be seen in the chart overleaf
this shows the proportion looked after in the community, 86.2%, to be more in line with all
looked after in the community.  Looked at overall, 6.1% of looked after children are from  BAME
communities compared with 3.7% in March 2022.  Part of the reason for this is West
Dunbartonshire's commitment to the National Transfer Scheme for Unaccompanied Asylum
Seeking Children as well as supporting those unaccompanied asylum seeking children who
arrive spontaneously in the local authority area.

Page 51

50Annual Performance Report 2022/2023
West Dunbartonshire Champions Board has been re-launched during 2022/23 in collaboration with
Y-Sort It and Who Cares Scotland? and is crucial to how The Promise is implemented.  The voice of
our care experienced children and young people must be central to how we move forward, while
also ensuring there is a solid feedback loop to those with power to make changes. The priority for
the Champions Board is to re-engage with young people, and some of their many Corporate Parents,
after the sustained impact of the pandemic since 2020.
The Champions Board realise the importance of working closely alongside The Promise Lead Officer,
and look forward to having the voices of care experienced young people being heard, listened to,
and actioned upon.  They are also in the process of setting up a group for parents and carers who
would like to influence how services develop.
Care experienced young people have been involved in recruiting new Children’s Hearings Panel
members by sitting on Interview panels, alongside existing Panel members.  While this took place
online during 2021/2022, the 2022/2023 recruitment campaign has been face-to-face.  The
Champions Board was also successful in obtaining funding to create a campaign about stigma
around mental health and have started work on a video.
Engagement sessions around The Promise took place from May 2022 – January 2023, reaching over
300 people.  The Lead Officer attended team meetings to provide input on The Promise and support
discussions with teams: how The Promise relates to their role, and what they feel are priorities
within West Dunbartonshire in implementing The Promise.  These sessions have been delivered
within Education, Social Work, Health, the Third Sector, Elected Members and Foster Carers.  Further
sessions are planned later in 2023, including reaching communities and creating a sustainable way
of keeping people up to date with developments.
The Promise Scotland is an organisation set up to support change and to support Scotland to keep
its promise to care experienced children and families.  Their first phase Plan 21-24 outlines
Scotland’s route map, providing key priorities and areas of focus under which organisations will work
to achieve the required change up to 2024.  Family Support is a priority within the Plan for which
there is national investment from the Scottish Government to re-design our services locally.  A sub-
group on Whole Family Support has been created with work underway in developing our Family
Support. Informed by self-evaluation and review, we have identified that our key areas for
improvement and development are: involvement and participation; communication and access; the
GIRFEC refresh; revision of parenting supports; piloting single points of access; developing
professional learning; and embedding self-evaluation processes.
The experience and views of our families is at the heart of this work, ensuring we reach out to as
many children, young people, parents and carers as possible.   A wide scale survey of parents/carers
and children and young people was carried out in December 2022 with over 2,000 responses. 
Further focus groups are being held with families who have direct experience of accessing support
services to deepen understanding.
West Dunbartonshire Health and Social Care Partnership

Page 52

51Annual Performance Report 2022/2023
Each and Every Child have provided free training to over 80 multi-agency staff within West
Dunbartonshire and offer support around language and how we can reframe the narrative around
care experience to reduce stigma.  Who Cares Scotland? will provide training on Corporate Parenting
and the responsibilities attached.
Four Independent Reviewing Officers have been recruited and take up their posts in May 2023. They
will conduct all reviews for looked after and accommodated children within West Dunbartonshire.
This will bring increased accountability, consistency and independence to these reviews and support
with improving the experience of children and families in making meetings more accessible and
child friendly.
The HSCP's Throughcare and Aftercare team have continued to support large numbers of care-
experienced young people: 130 during 2022/23.  In the face of an increasingly difficult financial
situation the team have made best use of all available resources and been creative in ways young
people can be supported with their daily living.  Education is an important route for young people
and the service continues to support a number of young people at college or university.  Those in
full-time education and in their own council tenancy receive free rent from West Dunbartonshire
Council to support them with their education: an excellent example of Corporate Parents in action.
As part of our Care Leavers Housing Protocol over 35 care leavers have been housed appropriately
through the protocol since 2018.  The statistics show that over 87% of those young people currently
remain in those tenancies: a significant achievement, highlighting that priority access to housing at
the right point in a young person's life can make a tangible difference to the success of the tenancy.
The Promise and the introduction of Continuing Care only serve to strengthen the ethos of
Throughcare, that young people in stable placements should remain there as long as possible.  The
older a young person is when they leave care, the more mature and prepared they will be to cope
with life beyond care and the practicalities of day-to-day living along with the support of services
such as Throughcare and Aftercare.
West Dunbartonshire Health and Social Care Partnership
Service Development: Unaccompanied Asylum Seeking Children
In August 2022 HSCP Children’s Services set out to work differently with unaccompanied asylum
seeking children who were presenting to us both spontaneously and through the National
Transfer Scheme (NTS).   Prior to this our main approach was to place young people in our
Children’s Houses and/or supported carer placements. This was resulting in reduced capacity
within supported placements, the Children’s Houses and our ability to meet new emergencies.  
As an alternative, local houses were identified as a housing support model, known as The
Project, and a specific staff group was created to provide bespoke supports for young people
arriving in West Dunbartonshire. We now have three properties housing six young people and are
examining ways of creating further capacity that will enhance this provision. This includes links
with Housing and with Action for Children.
In conjunction with this initiative, West Dunbartonshire Council was the first organisation to be
involved in the direct transport of children being placed in our care through the NTS. We have
been working directly with the Home Office to ensure identified children who plan to travel to
Scotland from Kent are fully supported with this transition. This has included staff from The
Project travelling to Kent equipped with information for the young people about their stay in
West Dunbartonshire including area profiles, networking information about travel from our
location, for example to Glasgow and Edinburgh, and details on how they will be supported by
The Project staff as they progress their application to remain in the UK. All of this information is
shared and discussed with the young people in their own language through interpreting services.
This practice has been celebrated at a local and national level. In most circumstances children
are travelling to host councils via paid taxis: a position that West Dunbartonshire Council found
to be poor practice. Since commencing our new approach and journeying down to Kent at least
three other council areas are now following our lead.  This model has made significant difference
to the young people experiencing this care and as a by-product has resulted in considerable
savings and freeing up capacity in our Children’s Houses.

Page 53

52Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The WDHSCP Board is responsible for the strategic planning and reporting of a range of health and
social care services delegated to it by NHS Greater Glasgow and Clyde Health Board and West
Dunbartonshire Council.
The Equality Act 2010 (the Act) harmonises and replaces previous equalities legislation and includes
a public sector equality duty which replace separate duties in relation to race, disability, and gender
equality.   The HSCP remains committed to integrating our obligations in respect of the equalities’
duties into our approach to strategic planning, performance management and into the day-to-day
operational activities of the organisation.
Section 149 of the Equality Act 2010 (the public sector equality duty) referred to as the General
Equality Duty ensures public authorities and those carrying out a public function consider how they
can positively contribute to a more equal society through advancing equality and good relations in
their day-to-day business, to:
In June 2022, West Dunbartonshire HSCP Board approved the biennial equality mainstreaming report
for 2020-2022 for publication which is available at:
http://www.wdhscp.org.uk/media/2541/equalities-mainstreaming-report-2022.pdf
The HSCP Board also agreed at that time to refresh the current equalities outcomes as part of the
development of the new Strategic Plan 2023-26 and to strengthen and integrate reporting on
outcomes and mainstreaming activity directly in this Annual Performance Report.  This approach
covers reporting requirements for the specific duties under the Equality Act 2010 (Specific Duties)
(Scotland) Regulations 2012 as well as the general duties under the Equality Act 2010 of:
This annual reporting seeks to strengthen the approach to evidencing equality mainstreaming and
as such examples of mainstreaming equality are also highlighted in other parts of this performance
report.
As employment responsibilities in relation to Equality remain with the partner organisations, the
HSCP continue to link in with the Equality, Diversity and Inclusion Workforce Programme in NHS
Greater Glasgow and Clyde and the Equality and Employment monitoring for West Dunbartonshire
Council and connect these with the HSCP Workforce Plan. 
Take effective action on equality
Make the right decisions, first time around 
Develop better policies and practices, based on evidence 
Be more transparent, accessible, and accountable 
Deliver improved outcomes for all
Eliminating unlawful discrimination, harassment and victimisation and other conduct prohibited
by the Act.
Advancing equality of opportunity between people who share a protected characteristic and
those who do not.
Fostering good relations between people who share a protected characteristic and those who do
not.
Equalities Mainstreaming Activity

Page 54

53Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Equality Impact Assessments (EIAs) are a collaborative process where new policies or service
developments are considered and evaluated to identify where they may impact or disadvantage
certain groups of people within our communities due to either protected characteristics or social or
economic factors.
The HSCP continues to carry out EIAs on emerging programmes of work and EIAs completed in
2022/23 included:
Work continues to take place to support staff undertaking EIAs in order that the content and
practice continues to improve and develop over time. 
In line with the national guidance in the development of Strategic Commissioning Plans (2015), the
HSCP's Strategic Planning Group commissioned an updated Strategic Needs Assessment to support
the development of the next Strategic Plan 2023-26 and which continues to be used by the HSCP as
a resource to influence service development.  Importantly, this assessment has an extended
population section view including the most current projected population statistics and data on the
range of protected characteristics. 
Information on poverty and employability is also included in the Strategic Needs Assessment to
support implementation of the Fairer Scotland Duty which was enacted by the Scottish Government
in 2018.  This Duty places a legal responsibility on the HSCP to actively pay due regard to how to
reduce inequalities of outcome caused by socioeconomic disadvantage when making strategic
decisions. 
Mental health and wellbeing in the Primary Care Plan
West Dunbartonshire Distress Brief intervention Associate Programme
Substance Use Prevention Strategy Delivery Plan
Health and Social Care Assisted Transport Policy
West Dunbartonshire HSCP Strategic Plan 2023-26

Page 55

54Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Along with consideration of the Strategic Needs Assessment, workshop sessions were carried out as
part of the consultation for the new Strategic Plan.  Outputs of these sessions included identifying
the need to more effectively target inequalities in health outcomes and to better understand and
respond to women’s health needs.  A broad ranging consultation included communication with the
assortment of third sector community groups associated with West Dunbartonshire Equalities Forum
as well as the range of third sector organisations registered with West Dunbartonshire CVS, our third
sector interface, with the result that the theme of addressing Equality has become one of the four
strategic outcomes of the forthcoming Strategic Plan.
During 2022/23 the HSCP Equalities Group continued to refine their Improvement Action Plan and
hosted a face-to-face development session attended by 26 participants comprising of existing
members of the HSCP Equalities Group, officers from NHS Greater Glasgow and Clyde and West
Dunbartonshire Council who work with equalities alongside a number of colleagues who had
responded to an open invitation to all HSCP staff.
The development day was held to continue to:
Key themes from the day are captured below.
Understand the current position of equalities, work and existing good practice across a wider
audience.
Understand what was needed to refresh the Improvement Plan, contribute to the development of
the HSCP Strategic Plan 2023-2026 and to develop new equality outcomes by 2024.
Increase the opportunities for HSCP staff and wider colleagues/agencies to be involved and
engaged in this work.

Page 56

55Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The outputs and new actions from the development session have been added to the Equalities
Improvement Plan under the existing themes of leadership, training, awareness raising,
data/access, communication and best practice.
Some examples of work carried out in 2022/23 across the five themes include:
The HSCP invested in leadership training for equality and inclusion with 36
members of the extended management team having completed a full day session
on the Thobani 6 C leadership model for Equality and Inclusion which provides
an audit tool around six interlinked themes of Coherence, Consciousness,
Commitment, Courage, Connectedness and Co-production enabling them to lead
and integrate equalities within their service and service plans.  This work will be
further developed in 2023/24.
The HSCP continued to promote the range of equality, diversity and inclusion
training available from both WDC and NHSGGC.  In addition, the extended
management team development programme in 2022/23 included a session on
the Fairer Scotland Duty from the Improvement Service, given the refreshed
guidance from the Scottish Government, to help understand more clearly the
tools and resources available on the Duty from agencies such as the
Improvement Service.
The HSCP continued to link in with national equality campaigns participating in
visible flag raising event such as LGBT+ History Month and International Women's
Day.  Awareness of the impact of digital exclusion continues particularly for care
experienced young people. The HSCP Throughcare and Aftercare team have been
providing devices and phones to young people, and more recently have secured
three Connecting Scotland Grant awards to provide devices and Wi-Fi access to
care experienced young people.
Work on the Improvement Service co-ordinated Shaping Places for Wellbeing
Programme continues with proactive and preventative policy development work
including a local Place and Wellbeing Assessment being carried out on the
Implementation of Clydebank Town Centre Development Framework.  The HSCP
continued to work on the 2-year pilot Welfare Advice and Health Partnerships
with the GP practices involved using a combination of approaches to support
access to welfare rights advice and with strong links being created between the
Alliance Community Links Workers and the welfare rights workers to share
learning and provision of support.
Work included updating the webpages on WDHSCP's Equality and Diversity
section and highlighting equality events.
This includes work with Brain Health Scotland to establish an inequalities
focused dementia prevention risk stratification programme based on the FINGER
(Finnish Geriatric Intervention Study to Prevent Cognitive Impairment and
Disability) approach and is delivered through a multi-agency approach.  There is
also ongoing Work with the Royal National Institute for the Deaf to localise their
national healthy hearing campaign resources and materials.  Work continues to
address cost of living issues with the HSCP being active members of the WDC's
cost of living group, health visitors continuing to routinely ask about money
worries and refer on to WDC Working 4U for support as well as pathways being
redesigned to ensure financial inclusion checks are being made for people
accessing social care support.
Leadership
Training
Awareness
Raising
Data/Access
Communication
Best Practice

Page 57

56Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The Scottish Government's Medication Assisted Treatment (MAT) standards define what is needed for
the consistent delivery of safe and accessible drug treatment and support in Scotland.  The standards
apply to all services and organisations responsible for the delivery of care in a recovery orientated
system. The purpose of the standards is to: improve access and retention in MAT; enable people to
make an informed choice about care; include family members or nominated person(s) wherever
appropriate; and to strengthen accountability and leadership so that the necessary governance and
resource is in place to implement the standards effectively.
There were 28 drug misuse deaths registered in West Dunbartonshire in 2021, which is the most
recent available published data.  This was a decrease of 1 on 2020 and of 4 on 2019 although these
3 years had the highest number of deaths by far going back to 2010.
 
Medication Assisted Treatment Standards
When considered as a rate per 100,000 population, West Dunbartonshire has seen significantly
higher death rates than Scotland since 2019 and been only slightly lower than NHS Greater Glasgow
and Clyde since 2020.  In 2021 West Dunbartonshire had the 4th highest rate of drug misuse deaths
in Scotland. 
In addition, West Dunbartonshire was ranked the 7th highest area for drug-related hospital
admissions in 2021 with a rate of 318.51 per 100,000 compared to the Scottish National average of
228.26 per 100,000.

Page 58

57Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The drug-related situation in Scotland is complex and challenging, with an estimated 55,800 to
58,000 people having problematic drug use, and the number of drugs-related deaths being the
highest in Europe, with 1,339 deaths in 2020.  Poverty and deprivation are identified as key drivers,
with those from the most deprived areas being 18 times more likely to die from drugs-related deaths
than those from the least deprived areas. 
The changing landscape of drugs in Scotland includes an increase in polydrug use (use of more than
one drug in combination) and new synthetic psychoactives, as well as an aging population of
problem drug users with more complex needs.  The Scottish Government has published policies,
including 'Rights, Respect and Recovery' and the Alcohol Framework, with a commitment to reducing
drug and alcohol use, harms, and deaths.
The MAT Standards were developed by the Drugs Death Taskforce who brought together voices from
a wide range of stakeholders including those with lived experience.  The standards aim to drive
improvement within those services and reduce harm from drug use. 
Medication Assisted Treatment (MAT) Standards
1. All people accessing services have the option to start MAT from the same
day of presentation.
2. All people are supported to make an informed choice on what
medication to use for MAT, and the appropriate dose.
3. All people at high risk of drug-related harm are proactively identified
and offered support to commence or continue MAT.
4. All people are offered evidence-based harm reduction at the point of
MAT delivery.
5. All people will receive support to remain in treatment for as long as
requested.
6. The system that provides MAT is psychologically informed (tier 1);
routinely delivers evidence-based low intensity psychosocial interventions
(tier 2); and supports individuals to grow social networks.
7. All people have the option of MAT shared with Primary Care.
8. All people have access to independent advocacy and support for housing,
welfare and income needs.
9. All people with co-occurring drug use and mental health difficulties can
receive mental health care at the point of MAT delivery.
10. All people receive trauma informed care.
West Dunbartonshire Alcohol and Drugs Partnership (ADP) has a MAT Standards Implementation
Group consisting of all adult services operating across the ADP.  The group is responsible for
implementation of the MAT Standards and is chaired by the local clinical lead for the MAT Standards.
The implementation group feeds into the ADP governance structure.  A detailed project plan and risk
register has been developed to support local implementation of the MAT Standards.
An NHS Greater Glasgow and Clyde Implementation Steering Group has been established to ensure a
co-ordinated approach to implementation, and to oversee development of an Implementation Plan
to include strategic Greater Glasgow and Clyde actions needed to implement the 10 standards, a
financial framework, and progress monitoring requirements.

Page 59

58Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Public Health Scotland has been assessing all ADPs in Scotland in how well they are meeting each of
the MAT Standards.  As part of this process, West Dunbartonshire ADP had to submit both numerical
and experiential data to Public Health Scotland during 2022/23.
The experiential data was based on interviews conducted with people who use treatment services,
service providers (staff) and family members/nominated persons.  Red Amber Green Blue (RAGB)
scores for each of the 10 MAT Standards are expected to be delivered by the end of May 2023 to
West Dunbartonshire to denote Public Health Scotland's evaluation of progress made. 
 
Key actions/service improvements have been carried out to implement the MAT Standards within
West Dunbartonshire ADP services including:
• Change in service delivery to achieve implementation of MAT Standards 1 to 5.  This was achieved
after working in collaboration with Public Health Scotland via a test of change pilot.
Same Day Access to Medication Assisted Treatment
West Dunbartonshire has one of the highest levels of deprivation in Scotland.   Around 700
people affected by substance use are supported here.  In June 2022, West Dunbartonshire
Addiction Service piloted a project on same day medication assisted treatment in Clydebank.
The core project team focused on four key improvement areas: 
 
Some of the new ways of working developed during the COVID-19 pandemic were
maintained such as our open door policy and telephone and self-referrals.  We also
introduced the following changes:
 
Changes made to the service resulted in an 85% reduction in service access delays and a
65% increase in the number of people accessing treatment.  Retention in treatment has also
improved along with positive feedback on treatment choice and availability.
In terms of learning, the team appreciated the value of pathway mapping in the design
phase of the project.  The development of a low-threshold assessment checklist also
supported team members to assess opiate dependence levels.  This gave them more
confidence in the early stages.  The presence of senior clinicians supported team members to
adjust to new ways of working.  Challenges for the service have been around balancing the
needs and expectations of people accessing the service with safe clinical practice.  Raising
awareness of what to expect and why on the treatment journey is often critical to the
success of interventions.
Other factors contributing to the success of the pilot were:
Moving forward, Addiction Services are currently seeking Home Office licences to upscale
Buvidal provision,  a medication assisted treatment, and continue to collaborate with local
GPs to develop pathways between services.
Better patient engagement
Improved service access and choice
Reduced "did not attend" rates (DNAs)
Enhanced service experience
A same day prescribing protocol
Access to virtual patient referrals
Flexible transport provision, where required
Promotional materials developed in conjunction with people with lived and living
experience 
Close collaboration with GP services to enable treatment access and choice
Clinical leadership to support teams to adapt to new ways of working
Ongoing engagement with people accessing services to enhance therapeutic relationships
Deploying current team members in creative ways while offering support and guidance

Page 60

59Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
• Commissioning of a Non-Fatal Overdose service.  This team provides an Out of Hours 7 day 12 hour
service provided by a third sector partner.
• Commissioning of a Harm Reduction Mobile Unit.  This team provides an Out of Hours provision in
the areas where drug related deaths and harms are occurring and is provided by specialist trained
Harm Reduction Nurses.
• Additional funding secured locally for the recruitment of: two Advanced Nurse Practitioners, one to
support wider physical health needs of individuals accessing Addiction Services and another to
support the interface between Mental Health and Addictions Services (MAT Standard 9); and a
Cognitive Behavioural Therapist to support the delivery of MAT Standards 6 and 10.
• Additional funding provided to a third sector partner to support in the delivery of a family support
service.
• Development of Recovery Community and Lived and Living Experience Panel.
• Whole System Approach to Rights-Based, REACH advocacy workshops delivered to over 300
individuals within statutory and non-statutory services as well as people of the community.
• Recruitment of 2 dedicated advocacy workers for Addiction Services.
• West Dunbartonshire is one of 5 pilot sites for Planet Youth (formerly Icelandic Prevention Model).  
the Scottish Government, via the Drugs Death Taskforce, recently announced £1.5m funding to
support the programme over the next 2 years.  The local allocation has yet to be decided.
 
What do Recovery-Oriented Systems of Care mean to you?
Thoughts of HSCP and third sector staff, partner organisations and people with
lived experience across West Dunbartonshire Alcohol and Drugs Partnership

Page 61

60Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Best Value and Financial Performance
The nine National Health and Wellbeing Outcomes are set out earlier within this report.  This
chapter aims to demonstrate the effective and efficient use of our financial resources as required by
National Health and Wellbeing Outcome 9 as it aligns to one of our five key strategic priorities, as
illustrated below. 
 
The HSCP Board has a duty of Best Value, by making arrangements to secure continuous
improvements in performance, while maintaining an appropriate balance between the quality and
cost of health and social care services.  The HSCP Board is supported by the Chief Financial Officer
(CFO) who has the responsibility for the administration of the partnership’s financial affairs (s95 of
the Local Government (Scotland) Act 1973). The CFO and the finance team provide advice, guidance
and manage the totality of the financial resource across the partnership, promoting financial
sustainability as well as working closely with a wide range of stakeholders including the Council,
Health Board, neighbouring Health and Social Care Partnerships and the Scottish Government.
The financial reporting responsibilities of the CFO include preparing financial statements and
performance reports. Financial performance is an integral element of the HSCP Board’s overall
performance management framework, with regular reporting and scrutiny of financial performance
at meetings of both the HSCP Board and its Audit and Performance Committee.
 
The Annual Report and Accounts for the period 1 April 2022 to 31 March 2023 provides a detailed
financial overview of the year and the levels of funding from all our partners.  Some of the key
tables and messages are extracted below including the final outturn position and the movement in
reserves.
 
The HSCP Board approved the 2022/23 revenue budget on 21 March 2022 of £185.117m (excluding
Set Aside) to deliver on all delegated health and social care services. This opening budget position
was subject to many changes through the course of the financial year as further funding streams
are received, in the main from the Scottish Government to support a range of policy commitments. 
As well as the core budget there is a further allocation of a “Set Aside Budget” which is made
available by the Health Board to the HSCP Board, in respect of “those functions delegated by the
Health Board, which are carried out within a hospital setting”.  The proposed set aside budget at the
1 April 2022 was £33.620m, however this too is subject to change in line with actual activity and
demand for these services by our West Dunbartonshire population.
 
While there were budget gaps identified, the HSCP Board accepted recommendations to balance
the budget by the application of new funding streams, a number of operational adjustments and
the application of reserves. All financial performance reports presented throughout the year to the
HSCP Board are available on the HSCP website: http://www.wdhscp.org.uk/
 
 
 
The final 2022/23 budget available for delivering directly managed services was £185.541m
(excluding Set Aside).  The total net cost of providing these services was £193.926m, resulting in a
reported deficit of £8.385m (subject to audit).  This is detailed in the table below along with
comparative data for the last four financial years of the West Dunbartonshire HSCP Board.
 
Budget Performance 2022/23

Page 62

61Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The total cost of delivering all health and social care services amounted to £240.802 against
funding contributions £232.417m, including notional spend and funding agreed for Set Aside of
£41.323m, spend and funding managed by West Dunbartonshire Council for Assisted Garden
Maintenance and Aids and Adaptations of £0.562m and net spend and funding of Services hosted
by other IJB’s with Greater Glasgow and Clyde of £4.991m. This therefore leaves the HSCP Board
with an overall deficit on the provision of services of £8.385m.
 
The main challenges and cost pressures incurred by the HSCP during 2022/23 were related to
unfunded pay settlements within social care, employee related issues (such as staff turnover levels,
recruitment challenges and subsequent increased use of agency staff), the legacy impact of the
COVID-19 pandemic on service demand, global inflation affecting pay negotiations, prescribing
levels and the cost of providing care packages and the cost of living crisis. 
 
This deficit was partially funded by a drawdown from earmarked reserves of £8.107m leaving a net
deficit of £0.278m.  Reserves are classified as either:
 
The HSCP Board have an approved Reserves Policy which sets out the legal basis for holding
reserves and the process of applying those reserves.  It is recognised reserves are a key element in
demonstrating financial stability in the medium to long term.  Therefore the current policy strives
to hold 2% of total budget in unearmarked reserves, for 2022/23 this was approximately £3.9m.
 
The diagram below provides a high level representation on the type of reserves held to be utilised
in the delivery of our strategic priorities and national policy commitments.
 
 
 
Earmarked Reserves – separately identified for a specific project or ring fenced funding stream
e.g. Primary Care Improvement Fund, Mental Health Action 15 and Alcohol and Drug Partnership,
Covid Recovery and Service Redesign and Transformation; or
Unearmarked Reserves – this is held as a contingency fund to assist with any unforeseen events
or to smooth out the financial position of current year finances if approved savings programmes
do not deliver as anticipated.
Budget Performance 2022/23 (plus previous years 2018/19 to 2021/22

Page 63

62Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The movement in earmarked reserves is an overall decrease of £8.107m, bringing the closing
balance to £21.874m. There were a number of drawdowns and additions amounting to £16.706m
and £8.599m respectively.
The movement in unearmarked, general reserves is an overall decrease of £0.278m, bringing the
closing balance to £4.301m which is slightly in excess of the 2% target as set out in the Reserves
Policy.
 
The HSCP continued to detail its response to the COVID-19 pandemic within the Local Mobilisation
Plan (LMP) and associated costs through the financial tracker returns to the Scottish Government. 
The final submission for 2022/23 was submitted in May and detailed full year costs for the HSCP of
£2.863m as detailed below.  After deduction of the costs incurred for 2022/23 and holding onto a
small reserve for Carers PPE, the HSCP returned £6.348m of funds to the Scottish Government.
 
High Level Analysis of 2022/23 Earmarked and Unearmarked Reserves
2022/23 Covid-19 Spend against Funding

Page 64

63Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Achieving financial sustainability in the short, medium and longer-term is one of the HSCP Board’s
main strategic risks. The requirement to both remain within budget in any given financial year and
identify savings and efficiencies in the medium to long-term places significant risk on the HSCP
Board’s ability to set a balanced budget and continue to deliver high quality services. Although
underpinned by legislation, this risk may impact on the ability of the HSCP Board to ensure that the
Best Value principles of economy, efficiency and effectiveness continue to be a top priority of the
Board.
 
Throughout 2022/23 West Dunbartonshire HSCP Board continued to strive to deliver on its
strategic priorities as well as responding to and adapting services as the impacts of the COVID-19
pandemic continued to impact on the daily lives of the people of West Dunbartonshire.
 
We have demonstrated our commitment to strong financial governance through our performance
reporting and this annual report.  The ability to hold reserves and add to them in 2022/23, supports
our short and medium-term position as we face the challenges 2023/24 in delivering the strategic
outcomes contained within our new 2023 - 2026 Strategic Plan – Improving Lives Together, shaped
by our Strategic Needs Assessment.
The first Medium Term Financial Plan (MTFP) was refreshed as part of the 2022/23 Revenue Budget
exercise and approved by the Board on the 21 March 2022 and covers the period 2022/23 to
2026/27.  The plan will be updated again as part of the 2024/25 budget setting exercise.
 
The HSCP Board revenue budget for 2023/24 to deliver our strategic priorities is £223.869m,
including £34.292m relating to set aside and £0.479m relating to budget managed by West
Dunbartonshire Council for Assisted Garden Maintenance and Aids and Adaptations. The budget
identified a potential funding gap of £6.539m which will be addressed through an application of
earmarked reserves (£2.209m) and a range of savings options (£1.400m) and management actions
(£3.221m) and leaves a small amount of flexibility to support any delays in achievements of savings
options.
 
In 2023/24 we will closely monitor progress on the delivery of its approved savings programmes,
through robust budget monitoring processes, the Senior Management Team and the Project
Management Office (PMO).  We will respond to these challenges by continuing to build on the
strong governance frameworks already in place and continue to engage and collaborate with our
stakeholders, manage and mitigate risk and invest in our workforce and communities.
 
The ongoing reaction to and recovery from the pandemic adds a further layer of risk to our financial
stability going forward. The indicative budget gaps for 2023/24 to 2025/26 are detailed below and
illustrate the scale of the risk.  These will be subject to change as the full impact of the 2023/24
pay settlements for local government employed staff is revealed as well as other inflationary and
service demand pressures arising from the current cost of living crisis.
 
Medium Term Financial Outlook
Indicative Budget Gaps for 2023/24 to 2025/26

Page 65

64Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The medium term financial plan sets out the broad key themes on how we will work towards
minimising future pressures and remain financially sustainable.  These are:
 
 
The HSCP Board is clear that it needs to be as financially well placed as possible to plan for and
deliver services in a challenging financial climate, whilst maintaining enough flexibility to adapt
and invest where needed to redesign and remodel service delivery moving forward depending on
the funding available in future years. 
 
Through 2023/24 the Financial Performance Reports will continue to reflect all quantifiable
variations against the approved budget as well as anticipating and reporting on any material
changes or risks.
 
We await the publication of the Scottish Government’s refreshed Medium Term Health and Social
Care Financial Framework to provide some realistic working assumptions for 2023/24 and beyond.
 
Better ways of working – integrating and streamlining teams including the benefits of
information technology to deliver services more efficiently will release financial savings and
protect front line services;
 
Community Empowerment - support the vision for resilient communities with active, empowered
and informed citizens who feel safe and engaged to be a main contributor to service change
across health and social care;
Prioritise our services – local engagement and partnership working are key strengths of the
HSCP.  We must think and do things differently and find new solutions to providing support to
those who need it;
 
Equity and Consistency of approach – robust application of Eligibility Criteria for new packages
of care and review of current packages using the My Life Assessment tool; and
 
Service redesign and transformation – build on the work already underway redesigning support
to people to remain or return to their own homes or a homely setting for as long as possible. 
This will be across all care groups including older people, learning, physical and mental
disabilities and children and families, in partnership with Housing services, third sector and local
providers.

Page 66

Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
As stated above, the HSCP Board is responsible for ensuring that its business is conducted in
accordance with the law and proper standards, and that public money is safeguarded and properly
accounted for, and used economically, efficiently and effectively, i.e. demonstrate Best Value.
 
The HSCP Board is the key decision making body, comprising of six voting members, with one from
each partner organisation assuming the role of Chair and Vice Chair.  West Dunbartonshire Council
nominates three elected members and NHSGGC Health Board nominates three non-executive
members.  There are also a number of non-voting professional and stakeholder members on the
HSCP Board. Stakeholder members currently include third sector, Carer and staff-side
representatives; professional members include the Chief Officer and Chief Financial Officer.
 
The HSCP Board is scheduled to meet six times per year and all agendas and meeting papers are
available on the HSCP Board website.
While regular financial and performance reporting provides evidence of this, to fully meet this
responsibility the HSCP Board continues to have in place robust arrangements for the governance
of its affairs and the effectiveness of its functions, including the identification, prioritisation and the
management of risk. It has an established Audit and Performance Committee to support the Board
in its responsibilities for issues of risk, control and governance and associated assurance through a
process of constructive challenge and promoting a culture of continuous improvement in
performance.
In discharging this responsibility the Chief Officer has put in place arrangements for governance
which includes a system of internal control. The system is intended to manage risk to a reasonable
level and to support the delivery of the HSCP Board’s policies, aims and objectives.
The Chief Internal Auditor reports directly to the HSCP Board’s Audit and Performance Committee
on all audit matters, with the right of access to the Chief Officer, Chief Financial Officer and Chair of
the Audit and Performance Committee on any matter.
 
The business of the HSCP Board is managed through a structure of strategic and financial
management core leadership groups that ensure strong integrated working.  A summary of this is
illustrated below.
 
Good Governance
65

Page 67

66Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
The 2022/23 Internal Audit Annual Report for the HSCP Board identifies no significant control
issues and recognised: 
 
“The longevity of the Covid-19 pandemic and its extension from 2020/21 into 2021/22 meant that
the effect on the residents, partners and workforce remained an area of concern in 2022/23.
 
The COVID-19 pandemic has created additional demands for services whilst dealing with backlogs
which have accumulated alongside which there are rising costs and reduced funding available.
Continued transformation activity is crucial to ensure the Health & Social Care Partnership Board
can continue to deliver services and positive outcomes for the people of West Dunbartonshire.”
 
Overall the Chief Internal Auditor’s evaluation of the control environment concluded that
reasonable assurance could be placed upon the adequacy and effectiveness of systems of
governance, risk management and internal control in the year to 31 March 2023 within the Council
and the Health Board from which the Health and Social Care Partnership Board requires to receive
assurances and within the Health and Social Care Partnership Board itself.
 
 
Governance 2022/23

Page 68

67Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Appendix 1: Core Integration Indicators

Page 69

68Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Appendix 2: Local Government Benchmarking Framework

Page 70

69Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Appendix 3: Ministerial Steering Group Performance

Page 71

70Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership

Page 72

71Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Appendix 4: HSCP Strategic Plan Key Performance Indicators
* Calendar Year data

Page 73

Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
72

Page 74

73Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership

Page 75

73Annual Performance Report 2022/2023
West Dunbartonshire Health and Social Care Partnership
Appendix 5: Care Inspectorate Gradings 2022/23