WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2023/24
SUMMARY
PERIOD END DATE 31 August 2023
Total Budget Spend to Date Projected Spend
Annual
RAG
Status
£000 £000 £000 £000 %
Resources 5,660 3,593 5,738 78 1.4% 
Regulatory and Regeneration 3,190 1,198 2,908 (282) -8.8% 
People & Technology 7,564 3,979 7,410 (154) -2.0% 
Citizens, Culture and Facilities 17,235 7,512 17,246 10 0.1% 
Education, Learning and Attainment 115,907 40,095 117,487 1,580 1.4% 
Roads and Neighbourhood 16,050 12,107 17,015 965 6.0% 
4,047 2,732 4,186 139 3.4% 
Supply, Distribution and Property (1,488) 415 (1,465) 23 -1.5% 
Miscellaneous Services 7,614 3,887 7,503 (111) -1.5% 
Loan Charges 13,976 3,494 13,976 0 0.0% 
Capital Receipts used to fund Loan Charges (2,884) (253) (2,884) 0 0.0% 
Requisition (VJB) 732 195 779 47 6.4% 
Requisition (SPT) 1,588 1,588 1,588 0 0.0% 
Requisition (CJP) 1,697 0 63 (1,634) -96.3% 
Requisition (HSCP) 84,671 21,168 84,671 0 0.0% 
Non GAE Allocation (7,328) (1,832) (7,328) 0 0.0% 
Total Expenditure 268,231 99,878 268,892 661 0.2% 
Council Tax (40,254) (16,773) (40,254) 0 0.0% 
Revenue Support Grant (126,501) (52,028) (124,867) 1,634 -1.3% 
Non Domestic Rates (93,396) (38,915) (93,396) 0 0.0% 
Use of Reserves (8,080) (3,367) (8,080) 0 0.0% 
Total Resources (268,231) (111,082) (266,597) 1,634 -0.6% 
Net Expenditure (0) (11,204) 2,295 2,295 0.9% 
Department Summary Variance
Housing and Employability
ITEM 11

Page 2

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
RESOURCES SUMMARY
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
78 142 68 (10) -12% 
1,292 594 1,339 47 4% 
(341) 731 (276) 65 -19% 
2,287 1,008 2,254 (33) -1% 
323 125 330 7 2% 
17 0 26 9 51% 
(798) (125) (823) (25) 3% 
Central Administration Support 2,803 1,118 2,820 17 1% 
5,660 3,593 5,738 78 1% 
Variance
Service Summary
Service / Subjective Summary
Finance Business Centre
Audit
Revenues & Benefits
Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances

Page 3

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status 
£000 £000 £000 £000 %
870            284 782                (88) (0) 
744            319 750                6 0 
(149) (49) (136) 13 (0) 
822            357 759                (63) (0) 
749            (40) 533                (216) (0) 
Economic Development 155            327 220                65 0 
3,190         1,198 2,908             (282) (0) 
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Democratic and Registration Service
Legal Services
Licensing
Environmental Health
Planning

Page 4

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
836 347 818 (18) -2% 
2,032 784 2,049 17 1% 
4,697 2,848 4,543 (154) -3% 
0 0 0 0 0% 
7,564 3,979 7,410 (154) -2% 
Variance
Total Net Expenditure
Transactional Services
Change Support
Information Services
Human Resources (including risk)
Service / Subjective Summary
Service Summary

Page 5

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
389 72 330 (58) -15% 
1,308 565 1,344 36 3% 
236 81 225 (11) -5% 
Clydebank Town Hall 345 14 327 (18) -5% 
Libraries 1,815 599 1,879 64 4% 
Arts and Heritage 326 119 319 (7) -2% 
Catering Services 4,670 1,844 4,750 80 2% 
Building Cleaning 1,895 738 1,721 (174) -9% 
Building Cleaning PPP (202) (110) (170) 32 -16% 
Facilities Assistants 2,347 855 2,344 (3) 0% 
Facilities Management 601 211 585 (16) -3% 
Leisure Management 3,459 2,572 3,515 57 2% 
Events 48 (47) 77 30 62% 
17,235 7,512 17,246 10 0% 
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy

Page 6

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
Primary Schools 33,900 13,074 33,849 (52) 0% 
Secondary Schools 32,978 13,960 33,347 369 1% 
Specialist Educational Provision 17,224 6,528 18,526 1,302 8% 
Psychological Services 606 250 582 (24) -4% 
Sport Development / Active Schools 627 (197) 627 0 0% 
Early Education 9,530 (2,893) 9,504 (26) 0% 
PPP 16,501 7,374 16,508 7 0% 
Creative Arts 654 285 638 (16) -2% 
Curriculum for Excellence 92 63 92 0 0% 
Central Admin 953 665 958 4 0% 
Workforce CPD 365 128 362 (3) -1% 
Performance & Improvement 453 169 460 7 2% 
Education Development 2,025 690 2,035 10 0% 
Raising Attainment - Primary 0 0 0 0 0% 
Raising Attainment - Secondary 0 0 0 0 0% 
Pupil Equity Fund (including LAC PEF) 0 0 0 0 0% 
115,907 40,095 117,487 1,580 1% 
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure

Page 7

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
Transport, Fleet & Maintenance Services (571) 787 (379) 192 -34% 
Roads Services 3,014 2,328 3,318 304 10% 
Grounds Maintenance & Street Cleaning Client 7,416 3,090 7,416 0 0% 
Outdoor Services 243 45 279 36 15% 
Burial Grounds (265) (241) (240) 25 -9% 
Crematorium (1,101) (315) (982) 119 -11% 
Waste Services 9,757 3,482 10,030 273 3% 
Depots (0) 0 0 0 0% 
Ground Maintenance & Street Cleaning Trading A/c (2,443) 2,929 (2,427) 16 -1% 
16,050 12,107 17,015 965 6% 
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure

Page 8

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
Working 4 U 2,238 1,134 2,205 (33) -1% 
Communities 917 570 917 0 0% 
Homeless Persons 482 904 681 199 41% 
Private Sector housing 18 8 18 0 0% 
Anti Social Behaviour 392 117 365 (27) -7% 
4,047 2,732 4,186 139 3% 
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary

Page 9

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
SUPPLY, DISTRIBUTION AND PROPERTY
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
Housing Maintenance Trading A/c (875) (625) (896) (21) 2% 
Housing Asset and Investment 50 0 0 (50) -100% 
Corporate Assets (2,361) 196 (2,352) 9 0% 
Capital Investment Programme (5) 114 2 7 -140% 
Office Accommodation 1,231 273 1,280 49 4% 
166 183 188 22 13% 
0 (128) 0 0 0% 
Private Sector Housing Grants 81 0 83 2 2% 
Consultancy Services 225 403 230 5 2% 
(1,488) 415 (1,465) 23 -2% 
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Corporate Asset Maintenance
Procurement

Page 10

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2023/24
MISCELLANEOUS
PERIOD END DATE 31 August 2023
Total
Budget
Spend to
Date
Projected
Spend
Annual
RAG Status
£000 £000 £000 £000 %
5,590 3,137 5,580 (10) 0% 
701 269 700 (1) 0% 
1,323 481 1,223 (100) -8% 
7,614 3,887 7,503 (111) -1% 
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
Service Summary
Sundry Services
Members Allowances, etc

Page 11

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
Rent Rebates & Allowances (341) (276) 65 -19% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Democratic and Registration Service 870 782 (88) -10% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Legal Services 822 759 (63) -8% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Adverse variance is anticipated
Some vacancies are being advertised, the projected outturn assumes these will
be filled later in the year.
This services provides legal advice to the Council
The main reason for the favourable variance is vacancies in the service and
additional income received. An unbudgeted legal expense is partially offsetting
the favourable outturn predicted however it is anticipated that this expenditure
will ultimately be covered from reserves.
Favourable variance is anticipated
None available at this time.
This services deals with the administration functions and Democratic Services
within the Authority
31 August 2023
Budget Details
Variance Analysis
Variance
Reduction in overpayment (OP) recoveries is due to DWP recovering some HB
OP’s against Universal Credit, subject to the OP reason. Previously the Council
would have received 40% subsidy in OP’s with the ability to recover 100% of the
OP, therefore a potential to receive up to 140% of the OP value.  This change
means we receive 100% subsidy of the OP therefore a reduction from the
potential 140% that could have been recovered.
Resources
Payment of Rent Rebates and other Allowances
The main reason for the variance is vacancies within the service
Regulatory and Regeneration
Favourable variance is anticipated
Some vacancies are being advertised, the projected outturn assumes these will
be filled later in the year.

Page 12

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 August 2023
Budget Details
Variance Analysis
Variance
Planning 749 533 (216) -29% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Economic Development 155 220 65 42% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Information Services 4,697 4,543 (154) -3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Communications & Marketing 389 330 (58) -15% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
A favourable variance is anticipated.
No action is possible at this time.
The main reason for the favourable variance is vacancies in the service and
income is higher than budgeted. The additional income predicted is an in-year
benefit only as a result of one-off additional fees.
None at this moment
This service area provides general ICT support to the Council and also supports
transformational change and modernisation of working practices through
technology
Favourable variance overall is anticipated
Main reason for the favourable variance is vacancies within the service.
Additional telephone costs are being offset by recharge income to recover these
from other services. In addition centralised printing and leasing costs for copiers
are anticipated to overspend during the year.
This Service provides Building & Planning services
This service provides communication and marketing for the Council.
Employee costs are favourable due to vacancies.
None at the moment.
Favourable variance overall is anticipated.
People & Technology
Promotion of regeneration activities within West Dunbartonshire Council
Income is adverse due to delays in filling staff vacancies on posts that are
budgeted to be internally recharged. While these posts are vacant there is no
possibility of recharging these. This is being partially offset by a favourable
variance in staffing due to the same vacancies.
Income and expenditure will continue to be monitored throughout the year.
An overspend is anticipated
Citizens, Culture and Facilities

Page 13

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 August 2023
Budget Details
Variance Analysis
Variance
Libraries 1,815 1,879 64 4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Building Cleaning 1,895 1,721 (174) -9% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Catering Services 4,670 4,750 80 2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Leisure Management 3,459 3,515 57 2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
An adverse variance is anticipated
Overspend is anticipated
None at the moment.
Variance due to budgeted turnover not being projected as being met.
Spend to be monitored.
Overspend is projected.
None at the moment.
Adverse variance is anticipated.
This service includes the provision of Library, Culture and Museums within West
Dunbartonshire
Payment to West Dunbartonshire Leisure Trust for leisure services
The management fee to WDLT has been higher because of delays in the
reduction in community facilities provision
Employee costs are favourable due to vacancies.
No action is possible at this time.
This service provides cleaning services across all council buildings
Catering Services across WDC
Although employee costs are lower due to a number of vacancies this is more
than offset by higher food costs

Page 14

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 August 2023
Budget Details
Variance Analysis
Variance
Primary Schools 33,900 33,849 (52) 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Secondary Schools 32,978 33,347 369 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area includes all Secondary Schools.
A small underspend is anticipated.
Expenditure (particularly utility prices) and income (particularly income from
school meals in the new academic year) will be closely monitored.
An overspend is anticipated.
Education , Learning and Attainment
This service area includes all Primary Schools.
The principal adverse variances are an increase in the caseload for clothing
grants (£122k) ,an overspend against APT&C employee costs (£213k) following
the increase in turnover targets and an overspend on teacher costs (£105k)
following the pay award agreed after the budget was set. SPT bus contract costs
are also anticipated to be higher (£36k) than when the budget was set. Offsetting
this is a favourable variance against school meals income following an alteration
in the expansion of free school meals to primaries 6 and 7 (£155k) albeit income
from lets is adverse (£19k). Utility prices have been particularly volatile over the
past 18 months. Electricity and gas budgets were increased by about 11% for
2023/24 . However, actual prices for electricity have increased by up to 70%
while gas prices have fallen by 22%. The overall impact has been favourable -
while electricity has an adverse variance of £51k while gas has a favourable
variance of £440k.
The principal adverse variances are an overspend on APT&C employee costs
(£100k) following the increase in turnover targets and an overspend on teacher
costs (£105k) following the pay award agreed after the budget was set. Income
from lets (£111k) and from school meals (£175k) are likely to be less than
anticipated when the budget was set.Utility prices have been particularly volatile
over the past 18 months. Electricity and gas budgets were increased by about
11% for 2023/24 . However, actual prices for electricity have increased by up to
70% while gas prices have fallen by 22%. The overall impact has been
favourable - while electricity has an adverse variance of £35k while gas has a
favourable variance of £149k.
Expenditure and income  will be closely monitored.

Page 15

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 August 2023
Budget Details
Variance Analysis
Variance
Specialist Educational Provision 17,224 18,526 1,302 8% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Roads Services 3,014 3,318 304 10% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Employee costs are higher due to the knock-on effect of the higher pay award ,
higher turnover targets and higher overtime than reflected in the budget (£68k)
Plant hire costs have increased during the year to a level not foreseen when the
budget was set (£287k) . Similarly, electricity and street lighting costs have
increased during the year to a level not anticipated when the budget was set due
to inflationary levels (£294k). Miscellaneous property costs are also £16k greater
than anticipated (the largest being the depot cost allocation including a higher
electricity element) .Payments to contractors/materials (£276k) are anticipated to
be higher than anticipated when the budget was set. As a result of higher
operating costs income, including capital recharges, is anticipated to be greater
than budgeted (£673k)
Expenditure and income  will be closely monitored.
An overspend is anticipated.
This service relates to Roads operations, design, structures, street lighting, road
safety and school crossing patrols
This service area covers all ASN Services.
The principal adverse variances are an overspend on employee costs, principally
APT&C, (£169k) following the increase in turnover targets . Transport costs will
be significantly over-budget due to difficulties sourcing sufficient taxis with a
subsequent need to replace them with buses (£265k). Day placements are
currently on a par with last year but average day placement costs are
significantly higher (£250k) while residential placements (£676k) are 3% greater
at a time when residential placement costs have increased considerably. There
is an  adverse variance against the budget for placements with other local
authorities (£47k) and projected income from other local authority placements in
WDC is also adverse (£76k). Income to assist with Ukrainian pupils (£176k) has
been received and will offset additional employee costs.
An adverse variance is anticipated.
Roads and Neighbourhood
Management will continue to monitor all budget heads with a view to minimising
the overspend.

Page 16

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 August 2023
Budget Details
Variance Analysis
Variance
Transport, Fleet & Maintenance
Services (571) (379) 192 -34% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Crematorium (1,101) (982) 119 -11% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Waste Services 9,757 10,030 273 3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Homeless Persons 482 681 199 41% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Overspend anticipated
Housing and Employability
Waste Collection and Refuse disposal services
Employee costs are higher due to the knock-on effect of the higher pay award ,
higher turnover targets and higher overtime than reflected in the budget (£58k) .
Transport costs, principally hires, are greater than anticipated when the budgets
were set because of delays in acquiring new vehicles (£206k).
Expenditure and income  will continue to be monitored.
Income and expenditure will continue to be monitored throughout the year.
The cost of specialist repairs and materials/parts has increased to level not
reflected in current budgets.VTU income remains adverse (£52k) due continuing
restrictions on what MOTs are undertaken.
The increased income target is unlikely to be met
Transport services across WDC
Although there are savings on gas costs income from cremations is less than
budgeted with income less than the corresponding period last year
Overspend anticipated at present.
Waste removal/tonnage costs in particular will be closely monitored.
This service provides crematorium services within the Council area
This service seeks to prevent homelessness occurring across the authority and
improves access to support services
A year end overspend is anticipated
It is expected that the need for bed and breakfast contingency will cease later in
year as more WDC properties become ready for occupancy
The adverse variance is due to the inflationary effect on costs of white goods and
furniture together with requirement to retain bed and breakfast places due to
demand / delay in having WDC properties available,

Page 17

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 August 2023
Budget Details
Variance Analysis
Variance
Housing Asset and Investment 50 0 (50) -100% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Chief Executive and Chief Officers 1,323 1,223 (100) -8% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Miscellaneous
Favourable outturn expected.
There are two variances occuring in this service. Employee costs are showing a
small favourable variance due to two short-term Chief Officer vacancies. In
addition there is a large favourable variance due to income from an unbudgeted
staff recharge for the first half of the year which has now ended.
None required
This service manages capital investment across council and private sector
housing stock.
Supply, Distribution and Property
Employee costs are showing a favourable variance due to vacant posts within
the service.  Employee cost underspend is offset by a reduction in the level of
income being recharged to the Housing Revenue Account.
None Required
Slight underspend at year end
This budget includes spend relating to the Senior Management Team of the
Council

Page 18

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
YEAR END DATE
Total Budget Projected Spend RAG Status
£000 £000 £000 %
31 August 2023
Budget Details
Variance Analysis
Variance
Requisition (CJP) 1,697 63 (1,634) -96% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Revenue Support Grant (126,501) (124,867) 1,634 -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Requisition (Criminal Justice Partnership)
Resources
Other
This cost represents the payment made to HSCP in relation to the Criminal
Justice Partnership
Historically the buget has been set to include the Criminal Justice ringfenced
expenditure (£1.634m) and the (CPP) Community Justice Transitional Funding
(£0.063m). However, the ringfenced expenditure is directly incurred by HSCP;
with the associated ringfenced Scottish Government funding being paid direct to
the HSCP and as such has been removed from the projected council spend and
the projected council income.  Overall, this is a nil effect to the Council's
budgetary control outturn. The forecast outturn remaining, represents the
payment due to HSCP with regards the CPP element (£0.063m) which the
council receives as part of the RSG and is due to be paid over to the HSCP.
None Required
Overall, nil impact on outturn position.
This income represents the funding received from the Scottish Government
known as the "Revenue Support Grant".
Historically the budget has been set to include the income for the Criminal
Justice Partnership.  This element of income has been removed from the
forecast outturn, as has the associated expenditure as reflected within the CJP
requsition payment. Overall, there is a nil impact on the Council's outturn
position.
None Required
Overall, nil impact on outturn position.