Democracy Spraffa

Item 08 - West Dunbartonshire Council Annual Performance Report 2022_23

West Dunbartonshire Council · 25 October 2023
Back to West Dunbartonshire Council — 25 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Citizen, Culture, & Facilities 
West Dunbartonshire Council - 25 October 2023
Subject: West Dunbartonshire Council Annual Performance Report 2022/23
1. Purpose
The purpose of this report is to present the West Dunbartonshire
Council Annual Performance Report 2022/23 and supporting performance
information.
2. Recommendations
2.1 It is recommended Council notes the annual report and performance
information provided.
3. Background
3.1 This annual report fulfils a key Council requirement to report
performance publicly and is designed to ensure relevance and ease of
access for a wide audience.
3.2 Audit Scotland’s Direction and Guide sets out the Public Performance
Reporting (PPR) requirements for local authorities to be published by
March 2024 for the financial year ending 31 March 2023. Through these
PPR requirements, the Council should provide a suite of information on
how services are performing.  In addition to the annual report, the
Council publishes detailed year-end reports for each service area
through the strategic Delivery Plans, including performance indicators,
and a range of additional information which citizens may find useful.
3.3 The Annual Report is one element of a comprehensive approach to
PPR for the Council. In addition to this, reports and analysis will continue
to be prepared and published on key performance indicators from the
Strategic Plan and the Local Government Benchmarking Framework
(LGBF). PPR data will continue to be updated throughout the year to
ensure robust and timely reporting of data as it becomes available.
4. Main Issues
4.1 In line with our evolving approach to presenting accessible data, and
following on from previous reports, the Annual Report 2022/23
(attached as Appendix 1) encompasses a range of visual and
infographic-based data.  It is intended to offer a high-level overview of
achievements against each strategic priority in the previous year,
national performance within the LGBF, along with a range of
ITEM 8

Page 2

supporting strategic information on budgets, workforce and feedback.
LGBF data is continually reviewed and updated throughout the year by
the Improvement Service and therefore subject to change, data
reported is the most up to date available at time of reporting and is
accurate at time of reporting. In addition any modification to any data
within the full benchmarking suite may impact our comparative
performance.
4.2 The performance page of the Council website hosts a comprehensive
suite of PPR material in both infographic and narrative format. This 
enables anyone who wishes more information on areas highlighted in
the Annual eport to drill down to a more detailed level.
This model of reporting is in line with the Audit Scotland Direction and
also fits well with the Accounts Commission paper on the evaluation of
PPR, which recommends an overview-style report with supporting
detailed information.  
2022/23 Strategic Plan performance
4.3 A suite of 49 performance indicators was agreed when the Strategic
Plan 2022-2027 was developed and approved at Council in October
2022. These indicators are considered the most relevant for
evidencing the delivery of outcomes in relation to the key priority and
outcome areas as defined in the plan.
4.4 A more detailed performance report on Strategic Plan indicators is
attached as Appendix 2 to this paper.  All indicators are considered
by strategic services in the development of annual Delivery Plans,
and this informs the strategic assessment section of the plans and
also allows the identification of actions intended to improve
performance.  
4.5 The table below shows the total number of indicators reported
through the Strategic Plan and details the latest performance data for
the 2022/23 year.  
Indicator Status Performance Indicators
22/23
Total Indicators 49
Green 33 (67 %)
Amber 9 (19 %)
Red 7 (14 %)
4.6 As can be seen from the table above, based on the available data, 33
(67%) of Strategic Plan indicators have met or exceeded target, and
a further nine (19%) narrowly missed target.   
4.7 The seven (14%) indicators that significantly missed target in 2022/23,
are: 
• Number of attendances per 1,000 population for indoor sports and

Page 3

leisure facilities; 
• Percentage of total household waste that is recycled;
• Tonnage of biodegradable municipal waste landfilled;
• Percentage of Council houses that are energy efficient ;
• Percentage of residents satisfied with roads maintenance;
• Percentage of employee attendance improvement rate (teachers &
local govt.); and
• Percentage of Stage 1 complaints responded to within 5 working
days. 
Resident Satisfaction & Feedback Performance 
4.8  IBP Strategy and Research undertakes a monthly telephone survey of
resident satisfaction on behalf of the Council.  The survey is intended to
capture a representative reflection of how residents view the Council in
general and to gauge their satisfaction with a range of services. The
sample covers the G60 (10%), G81 (42%), G82 (22%) and G83 (26%)
postcode areas.  To ensure a respondent profile similar to the population,
interviews are carried out during the day and at evenings and weekends.
During 22/23, 1200 interviews were carried out per month in a pattern
broadly proportionate to the population profile of the area.   
4.8 Resident satisfaction is a key measure of how we are performing, and
within the Strategic Plan six indicators support this measure, perception
of the Council is also measured by five key indicators. The following
indicators represent, with the exception of roads maintenance, relatively
high levels of satisfaction.  A more detailed performance report on the full
suite of Telephone Survey satisfaction responses is attached as
Appendix 3 to this paper. 
Strategic Plan Indicators
Indicator 22/23 Status 22/23
Score
2021/22
Score
Change
% of residents satisfied
with street cleaning
Met target 72% 72% No
Change
% of residents satisfied
with Council services
overall
Narrowly
missed target
87% 88% -1%
% of residents satisfied
with parks and open
spaces
Narrowly
missed target
84% 87% -3%
% of citizens satisfied with
the Council website
Met target 85% 89% -4%
% of residents satisfied
with roads maintenance
Significantly
missed target
29% 38% -9%
Strategic Plan Indicators and Sentiment Statements

Page 4

Indicator 22/23 Status 22/23
Score
2021/22
Score
Change
% of residents who feel
the Council communicates
well with them
Narrowly
missed target
71% 74% -3%
Sentiment Statements
Indicator 22/23 Status 22/23
Score
2021/22
Score
Change
West Dunbartonshire
Council services are value
for money
Data only PI 66% 64% +2%
% of residents satisfied
with the way West
Dunbartonshire Council
runs services
Data only PI 79% 80% -1%
West Dunbartonshire
Council takes account of
residents' views
Data only PI 63% 65% -2%
I would speak highly of
West Dunbartonshire
Council
Data only PI 71% 75% -4% 
4.9 In addition to the Telephone Survey, an annual Citizen’s Panel was
completed in spring 2023 and received 282 responses, 25% more
than the previous year. Following the priorities of the Strategic Plan
2022-27, residents were asked to provide feedback on a range of
topics. Information from the Citizen’s Panel is used to assist with
strategic planning. A full report is available at Appendix 4. 
LGBF 2021/22 performance (latest data available) 
4.10 All 32 Scottish local authorities participate in the Local Government
Benchmarking Framework (LGBF). The Framework brings together a
range of performance indicators encompassing information on a wide
range of key services including education, housing, social work and
leisure as well as service costs and citizen satisfaction results. The use of
a consistent suite of indicators across all local authorities allows for
comparison of performance, meaning Councils can identify best practice,
learn from each other and improve what we do. 
4.11  Significant differences between local authorities in terms of population,
geography, social and economic factors and the needs and priorities of
local communities contribute to variations in performance. All of these
factors require to be taken into account when comparing performance
with other local authorities. 
4.12  There are 105 LGBF indicators in the suite overall.  An assessment has
been made of relative performance both against previous years and also
in relation to ranking against other Local Authorities in terms of family
groups and the Scottish average. A full report of all indicators can be

Page 5

found at Appendix 5.   
4.13 The 105 indicators can be classified in three thematic areas; Cost;
Satisfaction and Performance. Overall 64% are showing improvement
against the previous year (up from 50%).  The table below demonstrates
the comparative performance position for West Dunbartonshire in the
year of publication broken down by thematic area. 
Improved on
previous year
Better than
Scottish
average
Better than
Family group
average
Cost 33%  (7) 43% (9) 52% (11)
Satisfaction 64%  (8) 100% (11) 100% (10)
Performance 64% (47) 45% (36) 47% (39) 
4.14  When looking at performance over the three key areas, as in the table
above, we see that Cost indicators are showing less improvement than
the other areas. This is particularly significant in service areas such as
Environmental, Education and Adult and Social Care Services.   
The table below compares the relative rankings (indicative) for West
Dunbartonshire in the last five years of publication.   
1st quartile 2nd quartile 3rd quartile 4th quartile
2017/18 25% (17) 25% (17) 27% (19) 23% (16)
2018/19 33% (26) 24% (19) 17% (14) 26% (21)
2019/20 26% (21) 30% (24) 18% (14) 26% (21)
2020/21 28% (21) 21% (16) 22% (17) 29% (22)
2021/22 28% (30) 30% (31) 16% (17) 26% (27) 
4.15  When looking at performance over the previous five years, as in the table
above, we see that the top two quartiles performance has, in the main,
been improving year on year. 
4.16  The LGBF National Annual Overview Report (see Appendix 6) for this
data also highlights the important fact that Councils were operating in a
challenging context in 2021/22 as a result of the ongoing impact of Covid,
soaring inflation, reduced revenue funding and the cost of living crisis. It
also records that funding for Councils is not increasing at a sufficient
pace to keep up with demands. This is exacerbated increasing costs,
including the impact of living wage and pay settlements; additional
impacts on demand from increasing levels of poverty; and higher public
expectations. 
4.17 Councils have also faced increasing national policy and legislative
demands. According to the Improvement Service, whilst total revenue
funding for Councils increased in real terms by 5.3% in 2021/22
(excluding non-recurring Covid funding), the proportion of funding which
is ring-fenced and directed or provided with the expectation it will be
spent on specific services has grown from 18.2% to 23.0%. This has
resulted in a 1.2% real-terms reduction in revenue funding available to

Page 6

Councils in 2021/22 to pursue local priorities. Despite these significant
and ongoing funding pressures, the long-term trends in the LGBF reveal
that Local Government has continued to do well in sustaining
performance – and this is reflected in West Dunbartonshire. 
4.18  To ensure a sustained focus on improvement activity, the Performance &
Strategy team will continue to provide comprehensive support to Chief
Officers and services. In addition to the assistance provided to each Chief
Officer to support delivery planning and routine performance, the team is
also providing a range of business intelligence reports to inform
improvements.  This includes the routine quarterly report on the
telephone survey results, Citizens Panel analysis and further specific
tailored reports as required/requested. 
5. People Implications 
5.1 There are no personnel implications from this report. 
6. Financial Implications 
6.1 There are no financial implications from this report. 
7. Risk Analysis 
7.1 The content of this report forms a core element of the Council’s
public performance reporting (PPR) for 2022/23. Failure to gather
and report on delivery in this way may result in the Council not
fulfilling its PPR commitments as set out in Audit Scotland’s Guide. 
8. Equalities Impact Assessment (EIA) 
8.1 This report is for noting and does not recommend any changes to policy
or procedure at the Council. As such an EIA screening was not required. 
9. Consultation 
9.1 Consideration of the report at internal meetings forms the basis of
consultation on development of the Annual Report.  Content of the
annual report has been drawn from previously prepared reports from
Chief Officers. 
10. Strategic Assessment 
10.1 The Annual Report and supporting indicator reports directly link to the
Council’s 2022-27 Strategic Plan and the progression of all the
Strategic Priorities and Outcomes. 
Amanda Graham
28 September 2023

Page 7

Person to Contact: Nicola Docherty 
Performance & Strategy Team Leader 
Email: Nicola.Docherty@west-dunbarton.gov.uk 
Appendices: Appendix 1: West Dunbartonshire Council Annual
Report 2022/23 
Appendix 2: Strategic Performance Indicators
Scorecard 2022/23 
Appendix 3: WDC reputational tracker 2023-23 
Appendix 4: WDC Citizens Panel 2022-23 
Appendix 5: LGBF performance indicators
scorecard 2021/22 (latest data) 
Appendix 6: LGBF Annual National Overview
Report 2021/22 
Background Papers: WDC Strategic Plan 2022-27   
Wards Affected: All Wards