Democracy Spraffa

756347 - Minard PS Proposal Paper FINAL, 25/05/2023 Pre-Agenda Briefing of the Community Services Committee

Argyll and Bute Council · 8 June 2023
Back to Community Services Committee — 8 June 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1
Argyll and Bute Council
Education
PROPOSAL DOCUMENT:  June 2023
Review of Education Provision
Minard Primary School
Appendix A

Page 2

2
Proposal for the closure of Minard Primary School 
SUMMARY PROPOSAL
It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. 
The catchment areas of Lochgilphead Primary School and Furnace Primary
School shall be extended to include the current catchment area of Minard
Primary School. 
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are; 
• Minard Primary School has been mothballed for over 4 years. The
school roll is zero and not predicted to rise significantly in the near future.
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are
8.59 fte primary vacancies for teachers in Argyll and Bute.
• Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance.  The annual cost of the mothballing of the
building is £10,382.
This document has been issued by Argyll and Bute Council in regard to a proposal
in terms of the Schools (Consultation) (Scotland) Act 2010 as amended.  This
document has been prepared by the Council’s Education Service with input from
other Council Services. 
DISTRIBUTION 
A copy of this document is available on the Argyll and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
A summary of this document will be provided to: 
• The Parent Councils of the affected schools
• The parents of the pupils at the affected schools
• Parents of children expected to attend an affected school within 2 years
of the date of publication of this Proposal Document

Page 3

3
• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools
• The teaching and ancillary staff at the affected schools
• The trade unions representatives of the above staff
• Argyll and Bute Councillors (Ward 3 Mid Argyll)
• Furnace Community Council
• West Loch Fyne Community Council
• Lochgilphead Community Council
• Relevant users of the affected schools
• The Constituency MSP
• List MSPs for the area
• The Constituency MP
• Chief Superintendent, Police Scotland
• Chief Executive, NHS Highland
• Chief Executive Strathclyde Partnership for Transport (SPT)
• Area Commander, Fire Scotland
• Education Scotland
A copy of this document is also available from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
• Lochgilphead Library, Manse Brae, Lochgilphead, PA31 8XQ
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
• Lochgilphead Joint Campus, Kilmory, Lochgilphead, PA31 8AA
• Furnace Primary Furnace, By Inveraray, Argyll PA32 8XU
• Minard Village Hall, Minard, By Inveraray, Argyll PA32 8YB

Page 4

4
This document is available in alternative formats or in translated form
for readers whose first language is not English.  
If you would like this document in another language or format, or if you
require the services of an interpreter, please apply to the Executive
Director, Argyll and Bute Council Headquarters, Kilmory, Lochgilphead,
Argyll, PA31 8RT.   
Jezeli chcieliby Pañstwo otrzymaO ten dokument w innym jzyku lub w
innym formacie albo jeeIi potrzebna jest pomoc Uumacza, to prosimy
o kontakt z nami.

Page 5

5   
1 Introduction 
1.1  On 10th December 2019, Argyll and Bute Council approved the
continued mothballing of Minard Primary School on a temporary basis
until December 2020, and that the School premises be retained during
this time on a care and maintenance basis. 
Minard Primary School – Mothballing Decision:
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=5
48&MId=8513&Ver=4 (Agenda Item 11) 
1.2  Further to this, on 8th December 2020, the Community Services
Committee agreed that Minard Primary School would continue to be
mothballed on a temporary basis until May 2021 and that the school
premises be retained during this time on a care and maintenance basis.
It was also agreed by the Community Services Committee that in the
intervening period, Education Services would undertake a pre
consultation meeting as part of the preliminary work and options
appraisal process when it was permissible under the Coronavirus
Regulations relating to public gatherings. The Education Service
intended to undertake the required preliminary consultation, and an
options appraisal, for Minard Primary School in May 2021 but due to
the restrictions of the pandemic were unable to complete this work until
the last term. The Community Services Committee received a report
presenting and outlining details of a potential formal consultation under
the Schools (Consultation) (Scotland) Act 2010 (as amended) and a
broad timeline of this process. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=1
3970&Ver=4  (Agenda Item 13b) 
Following the preliminary engagement exercise, the Education Service
prepared an Options Appraisal in respect of Minard Primary School,
which was considered by the Community Services Committee on 25th
August 2022. Members noted the outcome of the Options Appraisal
(which identified closure of the school as the most reasonable option in
the circumstances); and agreed that Officers now formulate a draft
closure proposal that would come back to the June 2023 meeting of the
Committee for approval by Members which would subsequently trigger
the formal consultation process under the Schools (Consultation)
(Scotland) Act 2010.

Page 6

6  
Agenda for Community Services Committee on Thursday, 25
August 2022, 10:00 am - Argyll and Bute Council (argyll-
bute.gov.uk) (Agenda Item 8) 
1.3  The statutory process for the closure of a rural school is laid out in the
Schools (Consultation) (Scotland) Act 2010 as amended by the
Children and Young People (Scotland) Act 2014. The Act, as amended,
introduced a presumption against closure of a rural school and details
specific requirements which the education authority is required to follow
if they are formulating a proposal to close a rural school. This includes
the introduction of certain preliminary requirements which must be
satisfied prior to the formulation of a proposal.      
1.4  In addition, the Community Empowerment (Scotland) Act 2015 sets out
a new right for community organisations to request the transfer of local
assets into local community ownership/management. This may be
something that the Community wish to consider as part of or as a
consequence of this process. Public bodies including Councils must
consider such requests and make a decision within six months of
receiving a valid request.    
1.5  Minard Primary School has had zero pupils enrolled since elected
members approved the mothballing. 
1.6  There is a requirement to have special regard to the rural schools
factors prior to formulating a proposal to close a rural school. In
particular it is necessary to consider any reasonable alternatives before
considering closure. It is also necessary to consider the impact on the
wider community of a potential closure and the impact of any different
travel arrangements. These factors have been considered in the
preliminary requirements which were undertaken prior to this proposal
being written. A full assessment of the preliminary requirements is set
out in the Options Appraisal, which is attached as Appendix 5. 
1.7  The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area
of Scotland with outstanding place, people and potential for a
prosperous future for everyone. Our Council, along with our Community
Planning Partners, is committed to ensuring that Argyll and Bute’s
economic success is built on a growing population. At the time of writing
new Council Priorities re Argyll and Bute’s Corporate Plan for 2022-2027
are still in the process of being finalised and considered. 
1.8  At the time of writing, our agreed Council Priorities are to ensure that:    
• The education we provide meets the needs of all our young
people and their families

Page 7

7  
• We make the most of our assets to build the local economy  
• We support individual and community wellbeing 
• We strengthen and empower our communities  
• We ensure there are homes for all, we tackle poverty and build
opportunity  
• We have greener and cleaner communities  
• We are an employer of choice  
• We manage our finances prudently 
1.9  The Council, as an Education Authority, has a statutory duty in terms
of the Education (Scotland) Act 1980 to make adequate and efficient
provision of school education across their entire area for the current
school population and future pattern of demand. This is reflected in
“Our Children, Their Future” which is the Education Vision and Strategy
for Argyll and Bute Council. 
2  Proposal 
2.1  It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024.  The catchment areas of
Lochgilphead Primary School and Furnace Primary School shall be
extended to include the current catchment area of Minard Primary
School as identified in 2.2 and illustrated in Appendix 3. 
2.2 It is proposed that children in the Minard catchment area would be
directed to Lochgilphead Joint Campus or Furnace Primary, depending
on where they live in the catchment area. The proposal is that children
living in the north section of catchment area from Achagoyle Bay to
Blackstone Bay attend Furnace Primary (with that section of Minard’s
catchment area being subsumed by Furnace Primary School) and
children in the south section of the catchment area from Achagoyle Bay
to Kilmichael Beg attend Lochgilphead Joint Campus (with that section
of Minard’s catchment area being subsumed by Lochgilphead Primary
School). A map illustrating the proposed new catchment areas within
Minard is attached in Appendix 3. 
Reasons for this proposal 
2.3     This is the best option to address the reasons for the proposal which are: 
• Minard Primary School has been mothballed for over 4 years.
The school roll is zero and not predicted to rise significantly in
the near future. 
• Along with several other rural councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing

Page 8

8
there are 8.59 fte primary vacancies for Head Teachers and
teachers in Argyll and Bute.  
• Whilst the school is mothballed, the building is deteriorating with
limited budget for maintenance.  The annual cost of the
mothballing of the building is £10,382.
Additional Considerations 
• The Council needs to allocate its resources in a way that
ensures the quality of all of its services;
• This proposal will bring educational benefits and assist in
ensuring that the Education budget is more sustainable into the
future. This proposal document contains an Educational
Benefits Statement;
• The costs per pupil in under-occupied schools are excessively
high;
• Schools in the Council area are expensive to maintain and
operate. Retaining unnecessary accommodation is a serious
drain on the resources of the Council and diverts spending from
areas that directly affect the educational attainment of pupils;
and
• There is no realistic possibility at present of the Council being
able to bring its whole school estate up to a satisfactory
condition.  The present condition is unsustainable and can only
be improved by reducing the extent of the estate.
3 Preliminary requirements  
3.1  The Council is required to consider the future of Minard Primary School,
as it has been mothballed for over 4 years. The Council have
considered the reasons for making this proposal, and have also
considered other viable alternatives, the likely effect on the community
and the likely effect of different travelling arrangements as a
consequence of this proposal.  Financial implications were also
considered. Some of these figures have been recalculated since the
Options Appraisal was produced.  
3.2  The Council considered how the implementation of this proposal would
impact on the education of the children affected. The Council also
considered the impact on the children who currently live in the

Page 9

9  
catchment area but attend other schools, as well as children who may
potentially live in the catchment area in the future.   
3.3 The place of the school in the community was also considered, in
terms of the impact this proposal would have on the sustainability of
the community itself. The school has not been used by the local
community since it has been mothballed. 
3.4  Impact on the environment was taken into account during the initial pre-
consultation process.  This included a consideration of the transport
implications if this proposal was to be implemented, as children would
have to travel by bus to attend Lochgilphead or Furnace Primary
Schools. 
3.5  Three options were presented to the local community by the Council
for consideration during the pre-consultation phase, as required by
section 12A of the 2010 Act.   
3.6  Of the three options which were considered by the community and the
Council; (c) is the favoured option by the Council, as it was considered
it most adequately addressed the reasons for the proposal. 
a) Re-open Minard Primary School, 
b) Continued Mothballing of Minard Primary with pupils zoned to
Lochgilphead Primary and Furnace Primary schools. 
c) Close Minard Primary School and realign its catchment area to
Lochgilphead Primary and Furnace Primary schools (The
Proposal). 
3.7 When considering the above options; the positive educational benefits
of Lochgilphead and Furnace Primary Schools alongside the factors of
projected low pupil numbers, the challenges in recruiting teaching staff
and the considerable expenditure needed to bring the building up to
standard at Minard Primary School, in addition the lack of local support
for reopening Minard Primary School, option (c) was considered the
most appropriate response to the underlying reasons behind
consideration of this proposal. 
3.8 Following from an initial Options Appraisal which was presented to the
Council’s Community Services Committee on 25th August 2022, it was
agreed that the preliminary requirements were satisfied enabling the
draft closure proposal to be formulated, with the option to close Minard
Primary School and realign its catchment area to Lochgilphead and
Furnace Primary Schools (in the manner described at Paragraph 2.2,
and Appendix 3, of this Paper) being identified as the most adequate
means of addressing the reasons for possible proposal.

Page 10

10  
3.9 During the preliminary engagement regarding the future options for
Minard Primary School there were a range of viewpoints gathered from
parents, young people and members of the community.   
3.10 The community reflected that Minard Primary School had been an
integral part of the community, and there were contrasting views on the
proposals for the future of Minard Primary School.   
3.11 Closing the school would have no impact on staff or pupil travel from the
current arrangement. There would be no alteration to the current
environmental impact.   
Alternatives to the Proposal 
3.12 The community engagement process prior to the drafting of this proposal
considered the views of members of the community and also considered
any other alternatives to the closure of Minard Primary School.  Full
details from the community engagement and the findings from the
preliminary requirements, including assessment of the reasonable
alternatives, are attached as Appendix 5.   
3.13 In conclusion, after the pre-consultation with the community, the Council
feels that the proposal to close Minard Primary School and realign its
catchment area to Lochgilphead and Furnace Primary Schools (as
described at Paragraph 2.2 & Appendix 3) is the most reasonable means
to address the underlying reasons for considering the future of Minard
Primary School. Further detail is provided in relation to educational
benefits, travel, environmental impact, community impact and financial
impact below. 
4 Assessment of the Proposal 
4.1  It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochgilphead and Furnace Primary Schools shall be extended to
include the current catchment area of Minard Primary School as
detailed at Paragraph 2.2 and Appendix 3. 
4.2  Minard Primary School has been mothballed for over 4 years. The
school condition will deteriorate with limited budgets for maintenance.
The school roll is currently zero and although there is a small increase
in pupils within the catchment area projected, this is not significant
enough to make the school viable again. The annual cost of the
mothballing of the building is £10,382.

Page 11

11  
4.3  Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are
8.59 fte primary vacancies for Head Teachers and teachers in Argyll
and Bute.    
4.4  The Council needs to allocate its resources in a way that ensures the
quality of all of its services. 
4.5  This proposal will bring educational benefits and assist in ensuring that
the Education budget is more sustainable into the future.    
4.6   The costs per pupil in under-occupied schools are excessively high. 
4.7  Schools in the Council area are expensive to maintain and operate. 
Retaining unnecessary accommodation is a serious drain on the
resources of the Council and diverts spending from areas that directly
affect the educational attainment of pupils. 
4.8  There is no realistic possibility at present of the Council being able to
bring its whole school estate up to a satisfactory condition. The present
condition is unsustainable and can only be improved by reducing the
extent of the estate.    
4.9  As part of the preliminary requirements in the drafting of this proposal,
the Council considered three options.  The favoured option by the
Council is (c), as it was considered it most adequately addressed the
reasons for the proposal. 
a) Re-open Minard Primary School; 
b) Continued Mothballing of Minard Primary with the pupils
zoned to Lochgilphead and Furnace Primary Schools; 
c) Close Minard Primary School and realign its catchment
area to Lochgilphead and Furnace Primary Schools (The
Proposal). 
4.10 Having considered these other alternatives the Council has made a
decision that these are not viable alternatives to the closure proposal,
and will proceed with the option to consult on the proposal to close
Minard Primary School and extend the catchment areas of
Lochgilphead and Furnace Primary Schools respectively (as detailed at
Paragraph 2.2, and Appendix 3) to include the current catchment area
for Minard Primary School. 
4.11 The Council has undertaken an appraisal on impact if this proposal was
to be implemented.    
4.12 This includes an assessment of:

Page 12

12
• The school roll and predicted school roll;
• Teacher numbers; and
• The condition of the building.
4.13 The Council has carefully considered and reviewed the steps it has
taken to address the underlying reasons for the proposal (as outlined
at Section 2.3, above), prior to formulating this Proposal Paper.
4.13.1 In relation to the decline in the school roll, and no material
increase being predicted in the forthcoming years, the
School was mothballed over four years ago as a result of
a change to the School’s circumstances – i.e. the school
roll falling to zero. The Education Authority therefore
decided to mothball the school as a temporary measure
– in order to monitor the situation and assess whether
there was any likelihood of the school roll increasing to
the extent that the School became viable again in the
near future. The mothballing was subject to review at
least annually and the Education Service undertook to
review the position should any further school age pupils
move into the catchment area and/or if they
demonstrated a sufficient level of demand for the School
to justify its re-opening. As mentioned above, the School
has been mothballed for over four years, and its roll is not
predicted to rise in the forthcoming years to a level which
would make the School suitable for re-opening. As there
has been no material change in circumstance evidenced,
and having kept the position under review via mothballing
for several years, the Education Service are of the view
that matters should now move forward in the form of a
statutory closure consultation in order to determine the
future of Minard Primary School. This approach aligns
with that suggested by the Statutory Guidance for the
2010 Act, and Paragraphs 63-65 in particular. Further
details in relation to the School roll are set out at Section
5 of this Proposal Paper
4.13.2 In relation to the underlying reason for this proposal in
regards to recruitment of teachers, the issues that have
been faced by the Education Service regarding the
recruitment of teachers to Minard Primary School are
detailed at Section 6 of this Proposal Paper. Since the
School’s mothballing, in order to address this particular
issue, and prior to formulating this proposal, the
Education Service have offered a number of posts across
the Authority area on a permanent basis to a locality,
rather than to a temporary school, as an attempt to

Page 13

13  
increase the likelihood of attracting a permanent post.
The Council has also entered into a strategic housing
agreement with social housing partners to support staff
with sourcing accommodation (which is a particular
pressure in remote areas of Argyll and Bute), as well as
offering relocation packages. Furthermore, the Education
Service continues to work with UHI Argyll to recruit more
local candidates for teacher training. Notwithstanding
these efforts, the recruitment of teaching staff within
Argyll and Bute remains a considerable challenge, hence
why it is still a main underlying reason for this closure
proposal. 
4.13.3 In relation to the underlying reason for this proposal
concerning the condition of the school premises, the
school property will continue to deteriorate whilst it
remains mothballed. As mentioned at Paragraph 4.13.1,
above, there is currently no evidence to suggest that the
School will become viable for re-opening in the near
future. Whilst the School remains mothballed, it costs the
Council £10,382 annually. Accordingly, the Education
Service are now seeking approval to proceed with a
statutory closure consultation which, if subsequently
implemented, will allow the Education Service to use any
savings generated to the benefit of the other occupied
schools and pupils within the Education Authority’s area.
It may also allow for any plans for other uses of the
School property to be progressed, as it will need to be
permanently discontinued as an educational
establishment in the first instance. Further information
about the condition of the School building and premises
can be found at Section 7 of this Proposal Paper. 
4.14 The Council has also undertaken an assessment of likely educational
benefits or effects which this proposal may have if implemented on:    
• The pupils of any affected school;   
• Any other users of the school’s facilities; 
• Any children who would (in the future but for
implementation) be likely to become pupils of the school;
and 
• The pupils of any other schools in the Council area. 
4.15 In addition, the Council has also considered how to minimise or avoid
any adverse educational effects that may arise from the
implementation of this proposal.

Page 14

14  
4.16 The Council has also taken special regard to the following factors if
this proposal was to be implemented, as Minard Primary School is
classified as a very remote rural school: 
 Likely effect on the local community to be assessed by
reference to: 
o The sustainability of the community; and 
o Availability of the school’s premises and other
facilities for use by the school community. 
 Likely effect caused by different travelling arrangements
by reference to the effect caused by such arrangements
on: 
o Environmental impact; and 
o The schools pupils and staff and other users of the
schools facilities. 
4.17  Finally, the Council has also considered the financial implications of
implementation of the proposal and information on this is set out later
in this document. 
5 School Roll 
5.1  The information in relation to the school roll as shown below is drawn
from the yearly pupil census, which takes place in September each
year. School rolls by their very nature may fluctuate slightly on an
ongoing basis due to changes in pupil numbers as a result of pupils
moving to and from the catchment area. 
The school roll of Minard Primary School has seen a steady decline
since 2012. 
Table 2: Minard PS Furnace PS Lochgilphead
PS 
Roll Roll Roll
Capacity 33 50 249
2011-2012 10 21 213
2012-2013 9 18 221
2013-2014 6 12 231
2014-2015 8 10 230
2015-2016 6 7 233
2016-2017 5 7 221
2017-2018 1 6 221

Page 15

15
2018-2019 3 13 227
2019-2020 0 10 226
2020-2021 0 12 207
2021-2022 0 9 212
2022-2023 0 3 210 
Predicted Roll*
Table 3: Minard PS Furnace PS Lochgilphead
PS
Roll Roll Roll
Capacity 33 50 249
2023-2024     0(1) 3 203
2024-2025 2 5 198
2025-2026 1 4 188
*based on calculations available at February 2023
(NB 2023-24   Primary 1 Minard catchment registration to attend
Inveraray Primary by Placing Request.)
5.2  In 2022-2023 there are 9 primary school aged children who live in the
Minard Primary School catchment area and who attend other schools.
One pupil attends Furnace Primary; three pupils attend Lochgilphead
Primary. The remaining five pupils attend Inveraray Primary (by way of
placing requests).
5.3  The school roll is not predicted to rise significantly in the future. The
area around Minard is a small settlement and is not identified for growth
in the Local Development Plan: https://www.argyll-bute.gov.uk/ldp.  
5.4  Within the Minard Primary School catchment there is one housing
allocation identified in both the Adopted Local Development Plan 2015
and in the emerging Proposed Local Development Plan 2. This is site H-
AL 12/19 (re-referenced to H3023 in LDP2). The allocation has a
remaining capacity of 13 units with an extant planning permission
(16/02279/PP). The Proposed Local Development Plan 2 is currently at
Examination with the Examination Report anticipated within the month (at
April 2023).  Allocation H3023 received objections relating to the capacity
of the Allocation and this is currently being considered by the Reporter.
There is a consent for a single dwelling outwith the Allocation but within
the Minard Primary School Catchment Area.

Page 16

16
6 Teacher numbers 
6.1  Teacher numbers been improving nationally 2016 - 2021.  In 2022 there
was a small reduction of 0.2% in the total number of teachers in
Scotland.  In Argyll and Bute there has been a 5% reduction in the fte
number of teachers from 2021 and 2022.  
6.2  As the school has been mothballed for over 4 years, the issue of
recruitment of staff has not improved.  At the time of writing this report
there are 8.59 fte primary vacancies for Head Teachers and teachers
in Argyll and Bute.  Despite a sustained effort to secure permanent
staff, there is no reason to think that staffing would not continue to be a
considerable challenge for Minard Primary School 
6.3  At the current time, if the proposal was to be accepted and implemented
following consultation, there would be no impact on staffing levels at
Lochgilphead and Furnace Primary Schools.  
7 Condition of the building
7.1  Outlined in the Options Appraisal (Appendix 5 – section 6.3) are the
full financial details in reference to costs for the re-opening the building
or continuing to retain the building as mothballed. 
7.2  As part of the consultation process the Council would be open to
exploring with the community options in regard to the future of the
school building. This might involve consideration of matters around the
possibility to transfer the building to a recognised community group
through the provisions of the Community Empowerment (Scotland) Act
2015 or some other agreed mechanism. Such a route may provide the
community with an opportunity to utilise the building as a driver for
community benefit and potential regeneration that could also enhance
the sustainability of the community.  
EDUCATIONAL BENEFITS STATEMENT – LOCHGILPHEAD PRIMARY
SCHOOL
8 Assessment of likely educational benefits on pupils
8.1  If this proposal is implemented, the Council believes that there will be
considerable educational benefits arising from this.  These centre
around:
• Learning and teaching;

Page 17

17  
• Meeting learners needs; 
• Broadening the range of opportunities; and 
• The environment for learning. 
8.2 This initial statement focusses on Lochgilphead Primary School,
which is one of the schools that pupils from the Minard Primary School
catchment area could potentially attend. 
8.3 The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. There are no specific
educational benefits from reopening Minard Primary School as all
schools implement Curriculum for Excellence ensuring effective
learning and teaching which is matched to the needs of children,
however the closure of the school and continued attendance of pupils
at other schools allows children to experience a curriculum which is
matched to their needs.    
8.4 Minard and Lochgilphead Primary Schools are remote rural schools.
Each school is set within a very remote rural area (Scottish Government
classification). Although there are currently 9 school aged children in
the Minard Primary School catchment area, children from Minard
Primary School area who previously attended Lochgilphead Primary
School continued to benefit from education in a locality familiar to them,
and still relatively close to home.   
8.5 The co-location of the Early Learning Centre (ELC) and the primary
classes at Lochgilphead Primary School enables a strong transition
process between the ELC and school. 
8.6 Lochgilphead Joint Campus offers a 3-18 education experience which
is seamless at transition points between ELC to Primary and Primary to
Secondary. Children, young people and their parents/ carers benefit
from familiar and established relationships with their peers and teaching
staff across the sectors. 
9 Learning and Teaching 
9.1  The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to help
every child and young person to develop knowledge, skills and
attributes for success in learning, life and work. In Lochgilphead
Primary School, children are encouraged to be eager and active
participants who are engaged, resilient and highly motivated during

Page 18

18  
their learning. Children know that their views are sought, valued and
acted upon.    
9.2  The learning environment encourages high level of achievement,
providing a wide range of opportunities for children to achieve their full
potential within the four contexts of learning. In Lochgilphead Primary
School children may be taught in classes composed of children from
one year group or in some cases a composite class covering two year
groups. Lochgilphead Joint Campus also encompasses a Learning
Centre to support specific needs. Children benefit from being part of a
social context in which they can build relationships with different groups
and individuals, develop social skills, meet challenges and exercise
responsibilities as members of a social group. They are able to interact
and socialise with groups of children, take part in team activities and
move with their peers seamlessly to secondary school within the
Lochgilphead Joint Campus.    
9.3  There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National Improvement
Framework priorities include raising attainment for all, and closing the
gap between the most and least disadvantaged children.    
9.4  The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community.    
9.5  At Lochgilphead Primary School, staff are challenged and supported
through a range of continuous professional development and review
opportunities gained by working and learning with a range of
colleagues. Lochgilphead Primary School is part of the Mid Argyll and
Kintyre Cluster, which means that staff can be supported across the
area, moderation and tracking of pupil progress is enabled and staff
work across stage appropriate groups. Colleagues within Lochgilphead
Primary School are able to support and challenge each other on a daily
basis. The whole staff are able to bring a range of talents and skills to
benefit outcomes for learners.    
9.6  Lochgilphead Primary School encourages nurturing and positivity. The
co-location of the nursery and the primary classes at Lochgilphead
Joint Campus enhance the transition process for children moving from
Nursery to Primary one, through joint educational processes and liaison
between the two settings.

Page 19

19
10 Meeting learners’ needs 
10.1  Through the Getting it Right for Every Child (GIRFEC), practice model,
meeting the needs of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the opportunity to
reach their potential. Careful tracking and monitoring procedures are in
place to evidence pupil progress. This includes professional dialogue
with teachers, learning discussions with children, classroom
observations, assessment and looking at pupil work.    
10.2  The school also has planned meetings and discussions with parents.
These discussions between home and school improve parental
engagement whilst focussing on next steps for learning. Where
appropriate, intervention is put in place, while working effectively with
other agencies and parents to ensure the needs of each child are met.
In the primary classes, the majority of children are achieving national
expectations in reading, writing, listening, talking and numeracy.  All of
the schools in Mid Argyll continue to develop within the PATHS
program supporting positive behaviours and relationship within the
school. 
10.3  The staff, parent body and partner groups also bring opportunities for
increased collaborative working. This applies both in terms of the wider
curriculum and within aspects of the curriculum that may be enhanced
by staff individual expertise e.g. PE, language, science, expressive arts
teaching.  
11 Broadening the Range of Opportunities 
11.1  Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities and
attributes which they need for their mental, emotional, social and
physical wellbeing both now and in the future. 
11.2  There is also a strong transition process between Lochgilphead
Primary School and Lochgilphead High School, due to the nature of the
through school 3-18 arrangements where young people benefit from
continuity in relationships and connections.
11.3  Children are provided with a variety of experiences to develop their
sense of responsibility, independence, confidence and enterprising
attitude.  
11.4  Across the school children are engaged with learning and contribute
well in lessons. A strong sense of community exists with pupils and staff

Page 20

20
co-operating, communicating and working collaboratively across the
sectors to create a vibrant centre of learning for all.
12 Environment for Learning 
12.1  Lochgilphead Primary School is a suitably-equipped and well
supported school, situated in the town of Lochgilphead. The entire 3-
18 campus, opened in 2007, is modern, well maintained and along with
the surrounding scenery provides attractive accommodation for
Lochgilphead Primary School within Lochgilphead Joint Campus. The
school has an all-weather pitch adjacent to the school, which is well
utilised. The building has facilities for pupils and visitors with special
access needs.  
12.2  The children maintain links with friends who live in their own village as
well as creating links with children from other rural communities. 
12.3  Any mitigating effects around the adverse weather and transport issues
are outweighed by the benefits of this proposal. There is no change to
the travel arrangements that are currently in place nor to the
environmental impact from these. The travel distance (sourced from
Google maps) from Minard Primary to Lochgilphead Primary is 13.13
miles via A83. Travel time is approximately 19 minutes by car.  The
travel arrangements have been in place for more than three years.
12.4  In summary, there are a range of educational benefits for pupils if this
proposal was to be implemented, as summarised in the paragraphs
above.  There are benefits for the development of social and emotional
skills, as well as the educational benefits resulting from access to a
more diverse curriculum. The learning environment in Lochgilphead
Primary School also offers children the opportunity to participate in a
wider range of active learning strategies.  
13 Assessment of likely educational benefits on other users of 
the school’s facilities
Implications for staff 
13.1  If this proposal is implemented, there will be no new implications for
teaching and ancillary staff in Lochgilphead Primary School. 
13.2  If this proposal is implemented, the Council does not envisage any
adverse effects from the proposal in respect of staffing.  Should issues
arise however, these will be mitigated through the Council Educational
Management Team support structure.

Page 21

21  
Early Learning Centre Users – Pre Five Children 
13.3  The co-location for the Early Learning Centre (ELC) and the primary
classes at Lochgilphead Primary School enables a strong transition
process between the ELC and the school and includes joint educational
processes and liaison between the two settings. 
14 Assessment of likely educational benefits on any children who would
(in the future but for implementation) be likely to become pupils of the
school. 
Existing and future pupils 
14.1  Children who may live in this catchment area in the future will benefit
from the broad range of educational opportunities which are presented
through this proposal, as detailed above. 
14.2  There would be positive educational benefits associated with this
proposal particularly in opportunities for increasing the range of the
curriculum and increasing the use of active pedagogies.   
14.3  The proposal could increase the roll of Lochgilphead Primary School
and would thus extend the peer group for all pupils, present and future. 
The larger school should be able to support a wider range of social and
extra-curricular activities.   
14.4  Pupils who would otherwise have attended Minard Primary School,
which consists of one classroom with dining area, corridor with
cloakroom, toilets and office, would benefit from access to modern
purpose built accommodation including dedicated sport facilities and
specialist areas.  Pupils would have access to access daily interaction
in a larger peer group and from improved educational arrangements as
described above.  Pupils in the combined school will have more shared
experiences and opportunity for friendships.  This will enhance their
confidence and make the transition to secondary school seamless
through the Joint Campus arrangements.  Larger year groups make the
provision of specialist services more viable and provide enhanced
opportunities for school trips. Lochgilphead Primary School meets all
the requirements of the Equality Act 2010.

Page 22

22  
EDUCATIONAL BENEFITS STATEMENT – FURNACE PRIMARY SCHOOL 
This second statement focusses on Furnace Primary School, 
which is one of the other schools that pupils from the Minard  Primary
School catchment area could potentially attend. 
Learning & Teaching 
15.1 The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. There are no specific
educational benefits from reopening Minard Primary School as all
schools implement Curriculum for Excellence ensuring effective
learning and teaching which is matched to the needs of children,
however the closure of the school and continued attendance of pupils
at other schools allows children to experience a curriculum which is
matched to their needs.    
15.2  Furnace Primary Schools is a remote rural school and set within a very
remote rural area (Scottish Government classification). Children from
Minard Primary School area, who previously attended Furnace Primary
School, continued to benefit from education in a locality familiar to them
and still relatively close to home. 
15.3 Furnace primary is presently staffed by a full time Principal Teacher
and class teacher (0.2FTE) which supports personalised learning in a
supportive environment. The school is also currently in a new and
changed shared headship arrangement with Inveraray Primary School. 
16 Learning and Teaching 
16.1 The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to help
every child and young person to develop knowledge, skills and
attributes for success in learning, life and work. In Furnace Primary
School, children experience good quality, personalised learning taught
in a single multi-composite class bringing with that the opportunity to
share learning experiences between the youngest and oldest pupils, as
well as within the immediate peer group.   Furnace Primary is part of a
shared Headship arrangement with Inveraray Primary School,
benefiting from close links with the larger school around educational
experience and planning tasks and activities that are matched to
children’s varying needs. The children at Furnace Primary are able to

Page 23

23
enhance their social skills and confidence by interacting with a wider
range of peers through opportunities to learn at Inveraray Primary
School in many  aspects of their learning including Science,
Physical Education and weekly outdoor learning.
16.2  The learning environment encourages high level of achievement,
providing a range of opportunities for children to achieve their full
potential within the four contexts of learning. In Furnace Primary School
children will be taught in a small class composed of children from more
than one year group. Children benefit from being part of a small social
context in which they can build relationships, develop social skills, meet
challenges and exercise responsibilities as members of a social group.
They are able to interact and connect with other children through
shared Headship arrangement with Inveraray Primary.  The
Headteacher is committed to making proactive connections between
the schools and the respective local communities.
16.3  There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National Improvement
Framework priorities include raising attainment for all, and closing the
gap between the most and least disadvantaged children.  
16.4  The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community.  
16.5  At Furnace Primary School, the small staffing complement are
challenged and supported through a range of continuous professional
development and review opportunities gained by working and learning
with colleagues at Inveraray Primary School. Furnace Primary School
is part of the Mid Argyll and Kintyre Cluster, which means that staff can
be further supported to collaborate, moderate and track pupil progress
and work with other colleagues to support children’s progress. 
16.6  Furnace Primary School encourages positivity and an inclusive ethos
through the individual support and attention delivered in a small school.
17 Meeting learners’ needs 
17.1  Through the Getting it Right for Every Child (GIRFEC), practice model,
meeting the needs of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the opportunity to
reach their potential. Careful tracking and monitoring procedures are in

Page 24

24
place to evidence pupil progress. This includes professional dialogue
with teachers, learning discussions with children, classroom and
assessment of pupil work.    
17.2  The school also has planned meetings and discussions with parents.
These discussions between home and school improve parental
engagement whilst focussing on next steps for learning. Where
appropriate, intervention is put in place, while working effectively with
other agencies and parents to ensure the needs of each child are met.
Children are achieving appropriate national expectations in reading,
writing, listening, talking and numeracy.
18 Broadening the Range of Opportunities 
18.1  Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities and
attributes which they need for their mental, emotional, social and
physical wellbeing both now and in the future. 
18.2  There is also a strong transition process between Furnace Primary
School and Lochgilphead High School, where staff link closely with
colleagues from Lochgilphead Joint Campus, to support smooth
transitions for children moving on to secondary school.
18.3  Children are provided with a variety of experiences to develop their
sense of responsibility, independence, confidence and enterprising
attitude.  Opportunities to learn at Inveraray Primary School in aspects
of their learning including Science, Physical Education and weekly
outdoor learning expand those experiences beyond Furnace Primary
School.
18.4  In Furnace Primary children are engaged with learning and contribute
well in lessons. A strong sense of community exists with pupils and staff
co-operating, communicating and working collaboratively to create a
calm, positive centre of learning.
19 Environment for Learning 
19.1  Furnace Primary School is a suitably-equipped and well supported
school, situated in the rural village of Furnace. The building is a small
traditional school, well maintained and along with the surrounding
forest areas and access to the beach excellent opportunities for
outdoor learning are available. The building has facilities for pupils and
visitors with special access needs.

Page 25

25
19.2  In Furnace Primary School the children maintain links with friends who
live in their own village as well as creating links with children from other
rural communities. 
19.3  Any mitigating effects around the adverse weather and transport issues
are outweighed by the benefits of this proposal. There is no change to
the travel arrangements that are currently in place nor to the
environmental impact from these. The travel distance (sourced from
Google maps) from Minard Primary to Furnace Primary is 3.82 miles
via the A83. Travel time is approximately 7 minutes by car. The travel
arrangements have been in place for more than three years.
19.4  In summary, there are a range of educational benefits for pupils if this
proposal was to be implemented, as summarised in the paragraphs
above. The learning environment in Furnace Primary School offers
children the opportunity to learn within a school with a strong sense of
community and personalised learning, whilst benefiting from
opportunities to expand those experiences with established links to
Inveraray Primary. 
20 Assessment of likely educational benefits on other users of 
the school’s facilities
Implications for staff 
20.1  If this proposal is implemented, there will be no new implications for
teaching and ancillary staff in Furnace Primary School. 
20.2  If this proposal is implemented, the Council does not envisage any
adverse effects from the proposal in respect of staffing.  Should issues
arise however, these will be mitigated through the Council Educational
Management Team support structure. 
21 Assessment of likely educational benefits on any children who would
(in the future but for implementation) be likely to become pupils of
the school. 
Existing and future pupils 
21.1  Children who may live in this catchment area in the future will benefit
from the range of educational opportunities which are presented
through this proposal, as detailed above. 
21.2  There would be positive educational benefits associated with this
proposal. The management arrangements of the school would be

Page 26

26
strengthened and there would be opportunities for increasing the range
of the curriculum and increasing the use of active pedagogies.   
21.3  The proposal could support the roll of Furnace Primary School and
would thus extend the peer group for all pupils, present and future.  The
larger school should be able to support a wider range of social and
extra-curricular activities.   
21.4  Pupils who would otherwise have attended Minard Primary School,
which consists of one classroom with dining area, corridor with
cloakroom, toilets and office, would benefit from a larger school building
of two classrooms plus Hall, kitchen facilities, toilets and associated
offices for Reception and Head Teacher. Pupils in the combined school
will have more shared experiences and opportunity for friendships
across the two rural villages. Developing connections with Inveraray
Primary support the Furnace rural school identity while benefiting from
the extended opportunity links with Inveraray Primary School. Furnace
Primary School meets all the requirements of the Equality Act 2010.  
22 Assessment of likely educational benefits on the pupils of any other
schools in the Council area 
22.1  The current mothballing of the school has had an indirect effect on other
pupils in Argyll and Bute.  The reduction in the running costs for the
school means that this is a saving to the Council, which is not taken
from elsewhere.  However, the annual costs of keeping the school
mothballed could feasibly be better allocated to the benefit of others.
22.2  There are no other significant impacts from this proposal on other pupils
in the authority or who attend other schools, in either a positive or a
negative way. 
Placing requests 
22.3  This proposal will not affect the right of parents to request that their
child attend a school of their choice rather than the designated school
in whose catchment area the family lives as provided by the Education
(Scotland) Act 1980. 
23 Consideration of how to minimise or avoid any adverse effects that
may arise from the implementation of this proposal 
23.1  The main adverse effect from this proposal would be the length of the
journey to school for children who live in the Minard Primary School
catchment area. However, the current arrangements (children from the

Page 27

27  
catchment area attending either Furnace Lochgilphead or Inveraray
Primary Schools) have been in place since Minard Primary School was
mothballed. Funded school transport would also continue to be
provided for pupils to the new catchment schools should this proposal
be implemented.   
24 Summary of educational benefits statement 
24.1  Educational benefits of this proposal, such as the ability for children to
participate in a broad range of experiences, the development of the
strategic leadership of the acting head teacher in taking forward
improvements in learning and teaching, and the ability to meet the
educational, social and emotional needs of the children are significant
benefits to this proposal. During the pre-consultation phase, these
benefits were explored in detail and details from the community
engagement and the findings from the preliminary requirements, to
include the alternative proposals and the authority’s assessment of
other likely effects of the proposal and the reasons for that assessment
are attached as Appendix 5.   
24.2  Whilst there are positive educational benefits, there is one negative
aspect identified which arises from the children attending Lochgilphead
or Furnace Primary Schools.  This negative aspect is principally around
the fact that children have to travel by either bus or car to school. 
However it is considered that the positive aspects of this proposal
outweigh the negative aspect of some travelling for children. 
25 Factors for rural school closures 
25.1  The Council has taken special regard to the following factors in relation
to this proposal as Minard Primary School is classified as a rural school. 
The likely effect on the local community if this proposal is
implemented    
25.2  The Council has made an assessment on the sustainability of the
community should this proposal be implemented and considers that this
may have a positive impact. 
25.3  The Scottish Government focuses on four key areas of importance to
rural communities;    
• a strong and diverse rural economy, harnessing traditional
strengths and with an appetite for change,

Page 28

28  
• thriving rural communities where everyone can enjoy a decent
quality of life, where the young are not forced to leave their
communities to get on and where the vulnerable are no longer
excluded, 
• strong, community focused public services that are accessible,
of the highest possible quality and with the greatest possible
choice, 
• a rural Scotland whose natural and cultural heritage flourishes
in all its diversity 
25.4 In rural communities, the challenges and opportunities are largely
defined by the local area and can often best be met by a bottom-up,
community-led response. Strong community leadership is vital to
articulating local priorities and driving forward change and growth.    
25.5 There is the potential if this proposal is implemented to capitalise on the
existing will and drive in this community, with opportunities for local
leaders to enable them to organise, motivate and inspire their
neighbours. A portion of the school grounds were previously acquired
by the Minard Community Trust for purposes in furtherance of the
community. In terms of the remainder of the School property, the
Council would be willing to engage with any community bodies coming
forward with an interest or proposals in relation to the same. 
25.6 Research1 has shown that when communities feel empowered, there
is: 
• greater participation in local democracy; 
• increased confidence and skills among local people; 
• more people volunteering in their communities; and 
• greater satisfaction with quality of life in the neighbourhood. 
25.7 Within Minard there is Minard Village Hall which is used for community
events. Almost all people who attended the preliminary consultation
strongly preferred that the school building should be retained for
community use and not allowed to fall in to further disrepair.    
25.8 Indeed, the school closure may help to empower the local community
should the community thereafter wish to explore the possibility of an
asset transfer process for the building.  This could have a positive
impact on community sustainability. A portion of the school grounds
were previously acquired by the Minard Community Trust for purposes                                            
1 https://www.gov.scot/policies/community-empowerment/

Page 29

29
in furtherance of the community. In terms of the remainder of the School
property, the Council would be willing to engage with any community
bodies coming forward with an interest or proposals in relation to the
same.  
On the availability of the school’s premises and its other facilities
for use by the community 
25.9  During the pre-consultation phase, there were differing views on the
closure of the school with the suggestion that the building and adjoining
grounds could potentially be retained for community use. Recently, the
Council has entered into a short term licence with an individual who is
using the School’s office space in connection with their academic
studies. Within Minard there is Minard Village Hall which is used for
community events. Most people who attended the pre-consultation
meeting felt that the school building should be retained for community
use and not allowed to fall in to further disrepair, as that would
adversely impact on the aesthetic of the community. 
25.10 It is accepted that a school closure may have an adverse effect on a
community, but a community hub could be an asset to the community.
This could have a positive impact on the sustainability of the community
and in particular the availability of the school’s premises and other
facilities for use by the community. Formal closure of the school would
mean that any developing plans for the future of the building could
potentially be progressed.   
The likely effect caused by any different travelling arrangements  
25.11 The travel distance from Minard Primary to Lochgilphead Primary is
13.13 miles via A83. Travel time is approximately nineteen minutes by
car. Minard Primary to Furnace Primary is 3.82 miles via the A83.
Travel time is approximately seven minutes by car. The travel
arrangements have been in place for more than three years. Travel is
an accepted aspect of living in the Minard community 
25.12  Implementation of the proposal would have no effect on the current
travel arrangements of staff and pupils. The closure of Minard Primary
School, in terms of current travel arrangements would have a neutral
effect on the environment. There would be no additional travel costs for
children attending Lochgilphead 3-18 Campus as there is capacity in the
current system.  
25.13 It is anticipated that the effect on the travel arrangements of staff and
other users of the facility would not differ materially from that of the
pupils accessing the school.

Page 30

30
Environmental impact 
25.14 Currently three children travel to Lochgilphead Primary School from the
Minard Primary School Catchment area. One pupil travels to Furnace
primary.  Therefore, this option would have a neutral environmental
impact on the current position and would have no impact on the current
travel arrangements for staff and pupils.  
25.15 If this proposal was to be implemented there would be little or no impact
on the natural environment. 
26 Financial Impact 
26.1  The full breakdown of the financial analysis is detailed in Appendix 4.
Some of this information has been recalculated since the Options
Appraisal was prepared. In particular the annual cost of mothballing the
school has been recalculated from £8,956 to £10,382. This information
gives details on the estimated cost if Minard Primary School was still to
be an occupied and operational establishment.  However, as Minard
Primary School is currently mothballed, the cost for the mothballing is
estimated at £10,382 per year. Should the school be reopened,
occupied and operational, the running costs per year are estimated at
£157,105.
26.2  Column 2 of Table 1 at Appendix 4 shows the projected annual running
costs of Minard whilst Column 3 shows the additional impact on
Furnace Primary as the receiving school at the time of mothballing.  The
annual recurring savings (or costs) are shown in Column 4. 
26.3  The main elements included within a school budget are teacher
employment costs (i.e. basic salary costs plus related employer’s
National Insurance and Superannuation contributions plus any relevant
individual allowances); Local Government employee costs and an
allocation for discretionary expenditure incurred by the school (i.e.
educational equipment, materials, staff travel, etc.). Teacher staffing
budgets are calculated on an annual basis and within the primary sector
are determined, taking cognisance of the SNCT class size maxima, by
the number of classes required to provide for the specific number and
age of the pupils in each school. When a school ceases to be
operational the teacher staffing budget is adjusted (at the appropriate
time), per entitlement information from Education HR, with the staffing
budget resulting in a nil value.  
26.4  In line with the national priority of maintaining teacher numbers, the
Education Service operates on the basis that supernumerary teachers
are redeployed and therefore their salary costs still exist with an

Page 31

31
increase to the receiving school’s budget. Some of the costs noted in
column 3 of Table 1 will not directly impact on the receiving schools but
they will be a cost to the Authority as a whole, for example school
transport, and the costs of maintaining the teachers previously
employed in Minard Primary School. 
26.5  There are currently no annual transport costs for pupils to attend
Lochgilphead Primary School. Transport costs per year to attend
Minard Primary School, if it were to be reopened, are estimated at
£1482 per year. Transport costs per year to attend Furnace Primary
School would be £1,482 although use of the service bus would incur no
additional transport costs.    
26.6 Table 2 contains the notional 30 year lifecycle costs that would 
arise based on the GIA of the various schools irrespective of the 
number of pupils accommodated. Lifecycle costs are representative of
the cost needed to keep the building in a good state of repair. The cost
over the next thirty years therefore to maintain Minard Primary School
£238,140 and for Furnace Primary School this is £530,955.
26.7  Table 3 contains the annual running costs during mothballing of Minard
Primary School and these are estimated at £10,382 per year. This
includes non-domestic rates, utility costs, insurances, etc. If the school
was to be formally closed, this would allow further consideration to be
given to the future of the School premises and any transfer in ownership
of the same.
27 Equality and Socio Economic Impact 
27.1 The Council as a public authority has a duty under the Equality Act
2010, the Public Sector Equality Duty 2011, the Fairer Scotland Duty
(Part one of the Equality Act) and the Islands (Scotland) Act (2018) to
have due regard to their provisions when making strategic financial
decisions. This is done through assessing the potential impact of the
decision on equality through Equality and Socio-Economic Impact
Assessments (EQSEIAs). 
27.2 The Council will undertake the process of assessment during the
consultation process in respect of this proposal to ensure that due
regard is given to such matters in the decision making process. A
finalised EQSEIA will be produced alongside the Consultation Report.

Page 32

32  
28 Consultation arrangements   
28.1 Prior to formulating a rural school closure proposal under the Schools
(Consultation) (Scotland) Act 2010 (the 2010 Act), as amended, the
Education Authority must satisfy the preliminary requirements set out in
Section 12A of the 2010 Act. The  Authority has previously identified its
reasons for formulating a possible proposal, considered whether there
were any reasonable alternatives to the possible proposal as a response 
to those reasons, and assessed each of the options in 
accordance with Section 12A(2)(c) of the 2010 Act. After considering a
paper addressing these preliminary requirements, the Education
Authority decided on 25th August 2022 that, having specific regard to the
reasons for formulating a prospective closure proposal, the option to
close Minard Primary School and redraw its catchment areas to
Lochgilphead and Furnace Primary Schools is the most appropriate
response to the specific reasons for the potential proposal. 
28.2  This document was considered by the Council as Education Authority
on 8th June 2023 when it was agreed that it should be adopted as a
relevant proposal and issued as a basis for consultation.  No decision
will be taken by the Council on the proposal contained in this paper until
after the end of the consultation period. The Council will then receive a
report on the consultation and will reach a view on the proposal. 
28.3  A summary of this document will be issued free of charge to all of the
consultees listed on page 2 of this document and it will also be
published on the Council’s website:      
https://www.argyll-bute.gov.uk/school-consultations-and-
proposals     
28.4  As part of a consultation process, the Education Authority must publish
the proposal paper, advertise it and notify Education Scotland and all
of the relevant consultees as prescribed by Schedule 2 of the 2010 Act,
inviting them to make representations on the proposal. The
consultation period will be from 15th June 2023 until the close of
business on 13th September 2023 which lasts for a minimum of 6 weeks
and includes at least 30 school days. 
28.5    A public meeting will be held at Minard Primary School on 29th August
2023 at 7.00pm. Anyone wishing to attend the meeting and participate
is welcome to do so. The meeting will be convened by the Education
Authority and the Education Authority will present reasons for bringing
forward the proposal. There will be an opportunity for questions to be
asked and comments to be made. A note will be taken so that
comments can later be summarised and considered. However, the
Education Authority will also consider written comments which should

Page 33

33  
be sent to Education Services, School Consultations, Argyll & Bute
Council, Argyll House, Dunoon, Argyll, PA23 8AJ and should be
received no later than 5.00pm on 13th September 2023. 
28.6  Written representations may be made on the proposal and the
alternatives to the proposal. Written representations may also suggest
other alternatives to the proposal. 
28.7  Following the close of the consultation, the Education Authority will
provide Education Scotland with copies of the written representations
submitted, a summary of the oral representations made at the public
meeting and any other relevant documentation. This will allow
Education Scotland to prepare a report on the proposal within a period
of 3 weeks. 
28.8  After receiving Education Scotland’s report, the Education Authority will
then prepare and publish a Consultation Report in accordance with
Sections 9, 10 and 13 of the 2010 Act. The Education Authority will
thereafter make its final decision on whether to implement the proposal.
The decision will be published a minimum of 3 weeks after publication
of the Consultation Report. If the Education Authority makes a closure
decision, it shall notify the Scottish Ministers within 6 working days of
that decision and publish the fact that the Scottish Ministers have been
notified, and that representations can be made to them. The Education
Authority would also be required to publish a notice on its website of
the decision to implement the proposal and why it has been satisfied
that closure is the most appropriate response to the reasons for
formulating the proposal.  
28.9  The Scottish Ministers will have a maximum of 8 weeks to call in any
closure decision made by the Education Authority in certain
circumstances. This 8 week timeframe would consist of an initial 3
weeks from the date of decision, during which representations can be
made to the ministers, and a further 5 weeks for the Scottish Ministers
to decide whether to issue a call in notice. During this period the
Education Authority will not proceed to implement any closure decision. 
28.10 If the Scottish Ministers call in a closure proposal, it is referred to the
Convener of the School Closure Review Panels. The Convener must
constitute a School Closure Review Panel within 7 days for
determination. The Education Authority may not implement a closure
decision in whole or in part until the Panel has made its determination.
It will usually issue a decision within 8 weeks of the Panel being
constituted. 
28.11 If the School Closure Review Panel refuses to consent to the closure
decision, or following publication of the Consultation Report the

Page 34

34
Education Authority decides not to implement the closure proposal, the
Education Authority cannot publish a further closure proposal in relation
to the school for 5 years, unless there is a significant change in the
school’s circumstances. 
29 Conclusion  
29.1  It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochgilphead and Furnace Primary Schools shall be extended to
include the current catchment area of Minard Primary School as
identified in Paragraph 2.2 and Appendix 3. 
29.2  It has been assessed that the proposal is the most appropriate means
of addressing the underlying reasons for formulating it, which are: 
• Minard Primary School has been mothballed for over four years.
The school condition will deteriorate with limited budgets for
maintenance. The school roll is currently zero and although
there is a small increase in pupils within the catchment area
projected, this is not significant enough to make the school
viable again. The annual cost of the mothballing of the building
is £10,382;
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing
there are 8.59 fte primary vacancies for Head Teachers and
teachers in Argyll and Bute; and
• The Council needs to allocate its resources in a way that
ensures the quality of all of its services.
Other Considerations
• This proposal will bring educational benefits to all present and
future users of the affected schools and assist in ensuring that
the Education budget is more sustainable into the future;
• The costs per pupil in under-occupied schools are excessively
high;
• Schools in the Council area are expensive to maintain and
operate;

Page 35

35
• Retaining unnecessary accommodation is a serious drain on the
resources of the Council and diverts spending from areas that
directly affect the educational attainment of pupils;
• There is no realistic possibility at present of the Council being
able to bring its whole school estate up to a satisfactory
condition. The present condition is unsustainable and can only
be improved by reducing the extent of the estate.
DOUGLAS HENDRY
Executive Director with responsibility for Education  
Wendy Brownlie
Head of Education: Performance and Improvement 
Councillor Yvonne McNeilly        
Policy Lead for Education  
For further information contact:  
Annette Trevelyan
Education Officer 
annette.trevelyan2@argyll-bute.gov.uk 
16th May 2023 
APPENDICES 
Appendix 1 - Consultation Letter 
Appendix 2 - Response form 
Appendix 3 - Maps 
Appendix 4 - Financial template 
Appendix 5 - Options Appraisal

Page 36

36
Kilmory,  
Lochgilphead,
Argyll,
PA318RT              
Telephone: 01546 605522 
Our Ref:  
E-mail:
annette.trevelyan2@argyll-
bute.gov.uk
Council Website: 
www.argyll-bute.gov.uk  
Minard Primary School
Dear Consultee, 
Review of Education Provision Notice and Summary of Proposal for
closing Minard Primary School Schools Consultation (Scotland) Act 2010
Background 
Argyll and Bute Council, through its Education Service, aims to realise
ambition, excellence and equity for all.   
The Council is consulting on a proposal to close Minard Primary School. This
notice provides a summary of a proposal that you may have an interest in or
are required to be notified of, giving you key information about the proposal. 
Argyll and Bute Council
Comhairle Earra Ghàidheal agus Bhòid 
Execut ive Director:  Douglas Hendry 
APPENDIX 1

Page 37

37
The Council is conducting a public consultation process. This will commence
on 15th June 2023 and will conclude on 13th September 2023. This is the
period within which you will be able to make written representations to the
Council in respect of the proposal.  If you wish your view to be taken account
of in the consultation exercise you must submit your written representation
within this period. This notice and summary provides further information on
where a full copy of the proposal may be obtained or referenced and also
advises on how you can make written representations to the Council. 
The Council will hold a meeting where officers will be able to provide
information on the proposal.  The details of the public meeting are contained
in this notice and summary. 
It is important that everyone we are consulting tells us what they think of the
proposal. Please read this notice and summary and then consider the
contents of the proposal document. You can then tell us what you think of the
proposal by making written representation and/or by attending the public
meeting. This notice and summary tell you how to do that. 
The Proposal
It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. The catchment areas of both
Lochgilphead and Furnace Primary Schools shall be extended to include the
current catchment area of Minard Primary School. The proposal is that
children living in the north section of catchment area from Achagoyle Bay to
Blackstone Bay attend Furnace Primary (with that section of Minard’s
catchment area being subsumed by Furnace Primary School) and children in
the south section of the catchment area from Achagoyle Bay to Kilmichael Beg
attend Lochgilphead Joint Campus (with that section of Minard’s catchment
area being subsumed by Lochgilphead Primary School).
Reasons for this proposal 
This is considered to be the best option to address the reasons for the
proposals which are; 
• Minard Primary School has been mothballed for over four years.
The school condition will deteriorate with limited budgets for
maintenance. The school roll is zero and is not predicted to rise in
the near future.
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there

Page 38

38
are 8.59 fte primary vacancies for Head Teachers and teachers in
Argyll and Bute.  
• Whilst the school is mothballed, the building is deteriorating with
limited budgets for maintenance.
The Council’s education strategy Our Children Their Future 
Together we will realise ambition, excellence and equality for all. 
• Raise educational attainment and achievement for all,
• Use performance information to secure improvement for
children and young people,
• Ensure children have the best start in life and are ready to
succeed,
• Equip young people to secure and sustain positive destinations
and achieve success in life,
• Ensure high quality partnership working and community
engagement,
• Strengthen leadership at all levels.
Alternatives to the Proposal 
The following alternatives to the proposal were considered at the preliminary
pre-consultation stage of this process;   
a) Re-open Minard Primary School,
b) Continued Mothballing of Minard Primary with the pupils zoned
to Lochgilphead and Furnace Primary Schools,
c) Close Minard Primary School and realign its catchment area to
Lochgilphead and Furnace Primary Schools (the Proposal).
Written representations may be made on those alternatives as well as on the
proposal. 
Written representations on the proposal may suggest other alternatives to the
proposal. 
What will we do? 
We will consult with people by: 
 Providing a notice of the consultation and a summary of the proposal
to the relevant consultees this is that notice and summary

Page 39

39  
 Placing an advert in the local press 
 Putting information on our website https://www.argyll-
bute.gov.uk/schoolconsultations-and-proposals 
 Holding a public meeting to explain the proposal 
 Ask parents, carers, children, young people, teachers, support staff
and others to tell us what they think of the proposals. 
What to do now? 
 Please read the full proposal document 
 Please attend the Public Meeting which will be held on 29th August
2023 at 7.00pm in Minard Primary School.  
 Let us know what you think by: 
Letter to:  Education Services 
School Consultations     
Argyll & Bute Council 
Argyll House 
Alexandra Parade 
Dunoon       
PA23 8AJ 
Returning the attached response sheet by post or by; 
Email to:  argyllhousereception@argyll-bute.gov.uk                     
What next? 
Whilst the Council is engaging in a consultation process in relation to this
proposal that does not mean that the proposal will go ahead. It does mean
that the Council is engaging in a consultation process to seek your views on
the proposal. 
All the points raised during the consultation will be carefully considered and
Elected Members will then decide if the plan should go ahead. 
If the suggestion goes ahead, any children from Minard Primary School
catchment area would be educated at Lochgilphead Primary School or
Furnace Primary School. 
Please note that this summary document is for convenience only.  Full details
of the consultation can be obtained from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ

Page 40

40
• Lochgilphead Library, Lochgilphead Community Centre, Manse Brae,
Lochgilphead, PA31 8XQ
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD
• Lochgilphead Primary School, Manse Brae, Lochgilphead, Argyll PA31
8SY
• Furnace Primary School,  Furnace, By Inveraray, Argyll PA32 8XU
• Minard Village Hall, Minard, By Inveraray, Argyll PA32 8YB
• It is also available electronically via our website:
https://www.argyll-bute.gov.uk/school-consultations-and-proposals  
Yours faithfully, 
DOUGLAS HENDRY 
Executive Director with responsibility for Education

Page 41

41
APPENDIX 2 
Argyll and Bute Council Education
RESPONSE FORM 
I wish my response to be considered as confidential with access
restricted to Elected Members and Council Officers of Argyll and Bute
Council. 
Proposal
It is proposed that: 
Education provision at Minard Primary School be discontinued with effect
from 31st May 2024. The catchment areas of Lochgilphead and Furnace
Primary Schools shall be extended to include the current catchment area of
Minard Primary School – to the extent that the north section of Minard’s
catchment area (from Achagoyle Bay to Blackstone Bay) will be subsumed
by Furnace Primary School; and the south section of Minard’s catchment
area (from Achagoyle Bay to Kilmichael Beg) is subsumed by Lochgilphead
Primary School.
This part of the form must be completed for a valid response:
Name: (please print)  Address: 
Post Code: 
I agree/do not agree (delete which does not apply) that my response can be
made publicly available 
Signature:  Date: 
YOUR INTEREST: (please tick) 
Parent    
Child /  
Young
Person 
Staff         Other  * 
Elected Member / MSP / MP    Member of Community
Council 
*Other: (please specify)

Page 42

42  
Please state your views on the proposal (continue overleaf if necessary)

Page 43

43  
APPENDIX 3 - MAPS 
MAP OF CURRENT PRIMARY SCHOOL CATCHMENT AREAS 
MAP OF PROPOSED MINARD CATCHMENT SUBSUMED TO FURNACE
AND LOCHGILPHEAD PRIMARY SCHOOLS

Page 44

44
APPENDIX 4 – FINANCIAL TEMPLATE 
Table 1
Column 1
Column
2
Column
3
Column
4
Current revenue costs for school proposed for
closure
Name of School
Minard Primary
Costs
for full
financial
year
(project
ed
annual
costs)
Addition
al
financial
impact
on
receivin
g school
Furnace
Primary
Annual
recurri
ng
savings
(column
2 minus
column
3)
School costs
Employee costs - note 1
teaching staff 106,384 111,704 -5,320
support staff 20,131 0 20,131
teaching staff training (CPD etc) 0
support staff training 0
Supply costs - note 2 3,129 0 3,129
Building costs:
property insurance 651 0 651
non domestic rates 1,648 0 1,648
water & sewerage charges 291 0 291
energy costs 8,474 0 8,474
cleaning (contract or inhouse) 278 0 278
building repair & maintenance 3,245 0 3,245
grounds maintenance 842 0 842
facilities management costs - note 6 122 0 122
revenue costs arising from capital 0
other - refuse collection; telephones 1,459 0 1,459
School operational costs:
learning materials 2,757 44 2,713
catering (contract or inhouse) 6,211 170 6,041
SQA costs 0 0 0
other school operational costs (e.g.
licences) 0 0 0
0
Transport costs: note 3
home to school  0 0 0

Page 45

45
other pupil transport costs 1,482 2,964 -1,482
staff travel  0 0
SCHOOL COSTS SUB-TOTAL 157,105 114,882 42,223
Income:
Sale of meals -105 -70 -35
Lets 0 0 0
External care provider 0 0 0
Other   0
SCHOOL INCOME SUB-TOTAL -105 -70 -35
TOTAL COSTS MINUS INCOME FOR
SCHOOL 157,000 114,812 42,188
UNIT COST PER PUPIL PER YEAR 52,333 38,271 14,063
2 This figure is based on current financial costs if transport was
necessary to be provided. 
Table 2 
Capital costs
School
proposed
for
closure
Minard
Primary
Receiving
school
Furnace
Primary
Capital Life Cycle cost - note 7 238,140 530,955
Third party contributions to capital costs 0 0
Table 3 
Annual Property costs incurred (moth-balling) until disposal
property insurance 651
non domestic rates  1,648
water & sewerage charges 291
energy costs 2,542
cleaning (contract or inhouse) 0
security costs 0
building repair & maintenance 0
grounds maintenance 842
facilities management costs 3,302

Page 46

46
Other - Routinely check drainage (gutters, downpipes);
cleaning equipment; phone lines 1,106
TOTAL ANNUAL COST UNTIL DISPOSAL 10,382
Table 4 
Non-recurring revenue costs
Securing building 7,150
TOTAL NON-RECURRING REVENUE COSTS 7,150
Table 5 
Impact on GAE 
0
GAE IMPACT 0