ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 JUNE 2024
EARMARKED RESERVES – 2023-24 YEAR-END 
1. EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide information on progress with balances already
earmarked within the General Fund and new balances earmarked at the end of 2023-
24 that qualify for automatic carry forward or have been previously agreed. It also
presents proposals to earmark two new areas of unspent budget which require
approval.   
1.2 The earmarked balance in the General Fund as at 31 March 2023 was £79.466m.  Of
this £27.286m has been spent during 2023-24 and £2.352m will be transferred back
to the General Fund.  The remainder is planned to be utilised in future years.   
1.3  There are two new unspent budget earmarking proposals totalling £3.200m with
business cases for approval.  These are noted in Appendix 2.1 and the associated
business case are in Appendices 2.1a and 2.1b. 
Department Description Appendix £000
Non Departmental Pay inflation contingency 2.1a 1,700 
Non Departmental Redundancy provision 2.1b 1,500 
Total     3,200 
1.4 There are further unspent budget carry forwards totalling £41.174m that have
previously been agreed by Council in relation to commitments to specific areas of
spend.  These include Service Concessions, allocations from the Loans Fund Review
to Capital Projects and a Treasury Gain to fund an agreed Management/Operational
Saving for 2024-25.   
1.5 There are new balances totalling £10.558m that qualify for automatic carry forward at
the end of 2023-24.  These include £3.535m of unspent grants; £2.575m relating to
the Strategic Housing Fund; £1.336m for the Piers and Harbours Investment Fund;
£1.212m of Scottish Government Initiatives, including 100 day promise and
expansion of free school meals; and £0.645m of carry forwards for the schools as
part of their Devolved Management of Resources (DMR).      
1.6 The new earmarked balance as at 31 March 2024 amounts to £107.443m.  The most
significant elements of this balance relate to Capital Projects £37.958m, Unspent
Budget £18.509m, Unspent Grant £15.786m, Strategic Housing Fund £8.765m and
Priorities Investment Fund £4.742m. 
1.7 There are historic earmarked reserves in relation to Social Work of £0.054m
contained within this report (£0.040m against Unspent Third Party Contributions and

Page 2

£0.014m against Scottish Government Initiatives).  For any new reserves, CIPFA
LASAAC Guidance dictates that any reserves relating to the HSCP should be held as
a creditor on the Balance Sheet as money owed to the HSCP from the Council.  It
should be noted that as at 31 March 2024, the balance being held on behalf of the
HSCP in this manner is £3.389m.

Page 3

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 27 JUNE 2024
EARMARKED RESERVES - 2023-24 YEAR-END 
2.  INTRODUCTION 
2.1 The purpose of this report is to provide information on progress with balances already
earmarked within the General Fund and new balances earmarked at the end of 2023-
24 that qualify for automatic carry forward or have been previously agreed. It also
presents a proposal to earmark two new areas of unspent budget which require
approval.   
3. RECOMMENDATIONS 
3.1 The Council is asked to: 
a) review and approve the revised Policy on Year End Flexibility included as
Appendix 1. 
b) approve the two new unspent budget earmarked reserve proposals totalling £3.2m
as supported by submitted business cases and note that there are a further 23
unspent budget earmarkings amounting to £41.174m that have been previously
approved, as outlined in Appendices 2.1 and 2.2.   
c) note the new balances of £10.558m at the end of 2023-24 that qualify for
automatic carry-forward as outlined in Appendix 3. 
d) note the previously approved earmarked reserves of £52.510m and the
justification for continuing to earmark these as outlined in Appendix 4. 
e) note that £0.140m of no longer required earmarked balances will be released back
into the General Fund.   
f) note that £2.212m of no longer required earmarked balances have been redirected
to the Capital Budget as per Council decision on 22 February 2024. 
g) note that £3.389m relating to Social Work reserves are recognised on the Balance
Sheet and is outwith the scope of this report.

Page 4

4. DETAIL 
4.1 Background 
4.1.1 The Council has previously agreed automatic earmarking of the General Fund in
respect of the following situations: 
• The balances in relation to the Strategic Housing Fund, CHORD and unspent
budget within the Devolved Management of Resources (DMR) Scheme of
Delegation for schools.
• Any unspent grants and unspent contributions from external bodies are
earmarked on the basis that the monies would have to be returned/repaid if
not used for the purpose intended. 
• Any unspent budget that relates to existing policy commitments arising from a
previous Council decision or is required to meet an existing legal commitment
is earmarked.
• Any unspent funding provided by the Scottish Government to implement new
legislation or government initiatives is earmarked. The funding carried forward
is used solely for its intended purpose to fund the implementation of new
government directions.
• Any savings generated from energy efficiency measures are carried forward in
an Energy Efficiency Fund for reinvestment to further reduce the Council’s
energy costs and carbon emission levels.
• The Piers and Harbours Investment Fund – for additional fees and charges
income generated from Piers and Harbours operation the funds will be used to
meet the costs of the prudential borrowing required to develop and maintain
the Council’s harbour assets and infrastructure.
• Hermitage Park - to meet the costs of the 10 year Management and
Maintenance Plan which is a condition of the Heritage Lottery Funding
investment into the Park.
• One Council Property – to invest in the Council’s property portfolio to ensure it
remains fit for purpose.
• Fleet Timing Delay – will be used where an order has been committed to be
spent from revenue budget but supplier issues prevent delivery within the
financial year.
• Electric Vehicle Charging – to allow earmarking of any surplus from chargers
to be used for the installation and maintenance of electric vehicle charging
points throughout Argyll. 
4.1.2  Outwith the situations noted above there will be no automatic carry forward of
unspent budget.  Earmarking of funds in relation to unspent budget and not covered
by the criteria above are reported to Members for approval and supported by a
business case. 
4.2 New Earmarked Reserves 
4.2.1 Appendix 2.1 provides detail of two new unspent budget proposals at the end of the
2023-24 financial year totalling £3.2m.  Members are asked to review these new
proposed earmarked reserves together with the business cases included at
Appendices 2.1a and 2.1b.

Page 5

4.2.2 Appendix 2.2 provides detail of the new unspent budget proposals that have
previously been agreed by Council in relation to commitments to specific areas of
spend.  The amounts agreed are as follows: 
• Service Concessions £36.038m – initial commitments from this fund were agreed
by Council on 23 February 2023 with further amendments made at Council on 22
February 2024.  Note £0.380m of the commitment was agreed to be transferred to
the Unallocated General Fund and has increased the revenue underspend for
2023-24 by £0.380m which will automatically go into the General Fund.  
• At the Council meeting on 27 February 2020, an allocation of £2.619m towards
the Funding Gap in the Capital Programme and £2.157m for Significant Strategic
Change Projects were agreed from the Loans Fund Review.  This amount is
being released to reserves to be utilised.  Some drawdowns have already taken
place in 2023-24. 
• As part of the 2024-25 budget setting, it was agreed by Council on 22 February
2024 that a saving of £0.294m be made from the Loans Fund (reference 202425
003) as a result of a discount received on the early repayment of loans.  This was
to be funded from an expected underspend from the 2023-24 outturn.
• The budget pack for Council on 22 February 2024 included provision for £0.839m
of Bellwin Costs being accounted for from the unallocated general fund.  As only
£0.641m was through by the end of 2023-24, an earmarking for the balance of
£0.198m has been created.
• Earmarking of £0.104m for investment income relating to the Asset Management
Fund.  When the Fund was set up, it was agreed that the income should be added
to it annually and this amount relates to the income for 2023-24.  This is already
committeed for a Commercial Investment Manager post and specialist consultant
technical resource as previously agreed by Executive Leadership Team (ELT).   
• On 23 February 2023, the Council agreed to the implementation of savings option
FIS2324-002 in relation to the Revenue and Benefits - Income Generation and
Business Process Review.   This included additional staff resource to undertake
the work.  Delays in recruitment have caused slippage in the allocated budget
resulting in an earmarking of £0.087m.  
• As agreed by Council on 22 February 24, a £0.057m underspend from the
Scotland Loves Local scheme to be allocated to support measures to help with
the cost of living. 
4.2.3  There are new earmarked balances for the 2023-34 financial year which qualify for
automatic carry forward in line with the conditions outlined in paragraphs 4.1.1.  The
new automatic carry forwards amount to £10.558m and are outlined in Appendix 3. 
These include £3.535m of unspent grants; £2.575m relating to the Strategic Housing
Fund; £1.336m for the Piers and Harbours Investment Fund; £1.212m of Scottish
Government Initiatives, including 100 day promise and expansion of free school
meals; and £0.645m of carry forwards for the schools as part of their Devolved
Management of Resources (DMR).   
4.3 Previously Approved Balances 
4.3.1 Appendix 4 outlines the previously agreed earmarked balances of £52.510m with a
note on the plans for use and, in some instances, further justification for why the
amounts remain earmarked.  A review of these has been undertaken by Financial
Services and is currently being scrutinised by ELT to ensure there are clear spending
plans in place and that the purpose of the earmarking is in line with Council priorities.
The outcome of this exercise will be reported to Members during 2024-25.

Page 6

4.3.3 The new earmarking agreed at the Council Budget Meeting on 22 February 2024 is
summarised below: 
• Capital Budget - £2.212m (this is the earmarking created from the release of
various reserves outlined at Section 4.4.2)
• Capital Contract Increases - £0.297m
• CHARTS (Culture, Heritage and Arts Assembly) - £0.075m 
• Mid Argyll Community Pool - £0.030m
• MacTaggart Leisure Islay - £0.030m
• Screen Machine - £0.028m
• International Eight Metre Association World Cup - £0.010m 
4.4 Balances released back to the General Fund 
4.4.1 The funds totalling £2.352m that will be un-earmarked are detailed in the paragraphs
that follow.  Note £2.212m is being redirected to the Capital Budget and £0.140m is
being released to the general fund. 
4.4.2 Due to pressure on the capital programme, Council agreed on 22 February 2024, that
the total of £2.212m released from the undernoted reserves should be directed to the
gap in the capital programme : 
- Rothesay Academy – Demolition and Waste Disposal - £0.880m
- One Council Property - £0.566m
- Contingent Liability – Capital Project - £0.439m
- Tackling Digital Exclusion - £0.178m
- Island Post - £0.050m
- Levelling up Fund Bids - £0.099m
4.4.3  £0.139m from Investment in Affordable Housing.  This earmarked reserve provides
cash backed reserves for the loans to registered social landlords and the revised
balance of £3.024m reflects the balance on those loans at 31 March 2024. 
4.5 General Fund Balance 
4.5.1 The General Fund balance at 31 March 2023 was £86.356m. Of this £79.466m was
approved by Council to be earmarked for specific purposes. The table at paragraph
4.6 summarises the movement in the earmarked balance to 31 March 2024. 
4.5.2 A total of £107.443m is earmarked to be carried forward into 2024-25.  The most
significant elements of this balance relate to Capital Projects £37.958m, Unspent
Budget £18.509m, Unspent Grant £15.786m, Strategic Housing Fund £8.765m and
Priorities Investment Fund £4.742m. 
4.5.3 The earmarked balances will be monitored throughout the financial year and reported
to the Policy and Resources Committee. 
4.6 Movement in Earmarked Balances

Page 7

4.6.1 Within the Actual Spend 2023-24 against the Connect for Success Fund, there was a
drawdown of £0.493m which helped balance the revenue budget in relation to an
underfunding for the 2023-24 pay award.  The funding will come in 2024-25 year so
will be reinstated to the earmarked reserve once received.   
4.7 Health and Social Care Partnership 
4.7.1 There are historic earmarked reserves in relation to Social Work of £0.054m contained
within this report (£0.040m against Unspent Third Party Contributions and £0.014m
against Scottish Government Initiatives) and can be found in Appendix 4, references
157 and 158.    
Earmarking Category Balance
at 31
March
2023
£000
Transfers
Between
Categories
£000
New
Earmarking
from
2023-24
Outturn
£000
New
Earmarking
Agreed by
Council
during
2023-24
£000
Actual
Spend
2023-24
£000
Released
back to
General
Fund
£000
Balance
Carried
Forward to
2024-25
£000
Strategic Housing Fund 7,247 0 2,575 0 1,057 0 8,765
Investment in Affordable
Housing 3,163 0 0 0 0 139 3,024
Capital Projects 16,059 2,327 29,442 2,509 12,379 0 37,958
Lochgilphead and
Tarbert Regeneration 1,460 0 0 0 410 0 1,050
Support for Rural Growth
Deal 756 0 0 0 215 0 541
Asset Management
Investment 2,098 (2,070) 0 0 28 0 0
Piers and Harbours
Investment Fund 2,789 0 1,336 0 0 0 4,125
Scottish Government
Initiatives 2,834 0 1,219 0 1,274 0 2,779
CHORD 378 0 120 0 89 0 409
DMR Schools 1,394 0 645 0 1,300 0 739
Energy Efficiency Fund 218 0 20 0 0 0 238
Existing Legal
Commitments 476 (38) 0 0 0 438 0
Unspent Grant 13,179 5,293 3,528 0 5,937 277 15,786
Unspent Third Party
Contribution 265 0 233 0 44 0 454
Previous Council
Decision - Other 3,808 0 845 0 513 0 4,140
Redundancy Provision 1,578 0 1,500 0 115 0 2,963
Connect for Success
Fund 1,426 0 0 0 745 0 681
One Council Property
Team 566 0 0 0 0 566 0
Fleet - Timing Delay 658 0 0 0 174 0 484
Hermitage Park 19 0 37 0 0 0 56
Electric Vehicle
Chargers 17 0 0 0 17 0 0
Priorities Investment
Fund 0 0 4,742 0 0 0 4,742
COVID-19 5,512 (5,512) 0 0 0 0 0
Unspent Budget 13,566 0 8,690 173 2,989 931 18,509
Totals 79,466 0 54,932 2,682 27,286 2,351 107,443

Page 8

4.7.2 For any new reserves, CIPFA LASAAC Guidance dictates that any reserves relating
to the HSCP should be held as a creditor on the Balance Sheet as money owed to the
HSCP from the Council.  It should be noted that the balance being held on behalf of
the HSCP in this manner is £3.389m.   
5. CONCLUSION 
5.1 A total of £2.352m of earmarked balances will be released from current earmarkings
with £2.212m of this being re-earmarked for Capital Budget, leaving £0.140m being
released into the General Fund.   
5.2 Services have submitted their new proposed unspent budget earmarked reserves
balances for the 2023-24 year-end for consideration by Members together with
business cases to support the requests, these proposals total £3.2m.  In addition
there is a further £41.174m unspent budget earmarking previously approved. 
5.3 There are a number of previously approved unspent budget earmarked reserves
balances where there are plans to spend in future years. A review of these has been
undertaken by Financial Services and is currently being scrutinised by ELT to confirm
there is clear justification for these to continue to be earmarked. The outcome of this
exercise will be reported to Members during 2024-25. 
5.4 There are new balances totalling £10.558m that qualify for automatic carry forward
for the Council at the end of 2023-24.   
6. IMPLICATIONS 
6.1  Policy  Outlines the new proposed unspent budget earmarking to be
carried forward as per the updated policy.  Also outlines the
new balances to be earmarked which qualify for automatic
carry forward
6.2 Financial  Outlines all earmarked balances held within the General Fund
6.3 Legal  None
6.4 HR  None
6.5 Fairer Scotland Duty  None
6.5.1 Equalities  None
6.5.2 Socio-Economic Duty  None
6.5.3
6.6
Islands Duty 
Climate Change
None
None
6.7 Risk  None
6.8
6.9
Customer Service 
The Rights of the
child UNCRC
None
None 
Kirsty Flanagan
Executive Director/Section 95 Officer 
Councillor Ross Moreland– Policy Lead for Finance and Commercial Services
4 June 2024 
APPENDICES

Page 9

Appendix 1 – Policy on End of Year Flexibility
Appendix 2.1 – New Unspent Budget Proposals 2023-24 (New Business Cases)
Appendix 2.1a – Business Case – Pay Inflation Contingency
Appendix 2.1b – Business Case – Redundancy Costs
Appendix 2.2 – New Unspent Budget Proposals 2023-24 (Previously Agreed)
Appendix 3 – New Automatic Carry Forward Earmarkings 2023-24
Appendix 4 – Previously Agreed Earmarked Balances 
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 10

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
1.  INTRODUCTION 
1.1 The Local Authority Accounting Panel (LAAP) Bulletin 99 provides guidance to
local authorities on the establishment and maintenance of local authority
reserves and balances.   
1.2 When reviewing their medium term financial plans and preparing annual
budgets, local authorities should consider the establishment and maintenance
of reserves which can be held for three main purposes:
• A working balance to help cushion the impact of uneven cash flows and
avoid unnecessary temporary borrowing – this forms part of general
reserves;
• A contingency to cushion the impact of unexpected events or
emergencies – this also forms part of general reserves;
• A means of building up funds, often referred to as earmarked reserves,
to meet known or predicted requirements; earmarked reserves are
accounted for separately but remain legally part of the general fund. 
1.3 Given the tightening financial situation it is essential that the Council gives
proper scrutiny to any proposal to earmark balances or carry forward funds. In
particular the Council should seek to ensure funding that is carried forward is
directed to and supports Council priorities in terms of corporate and service
plans.     
1.4 This note outlines the policy adopted by the Council for the earmarking and
carry forward of surplus funds to future years. 
2. POLICY 
2.1 SMT agreed the twelve situations where earmarking of the general fund reserve
is permitted. 
2.2 SMT agreed the protocol for use of reserves. 
3. DETAIL 
3.1 The Council hold a general fund reserve.  It comprises the following elements:
• A contingency for any unforeseen events or emergencies.  The
contingency is reviewed each year as part of the budget process. 
• The Strategic Housing Fund.
• Balances held to support the following year’s budget.
• Earmarked funds as noted below.

Page 11

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
3.2 At the end of each financial year any surplus for the year is added to the general
fund reserve.  At this time the Council have the opportunity to consider
earmarking surplus funds. 
3.3 There are twelve situations where earmarking of the general fund reserve is
permitted. 
• Unspent grant.  On some occasions a grant is received in one financial
year and will not be spent/fully spent until the following financial year.  If
the grant is not spent on the purpose intended the Council would have
to return the unspent grant, therefore, the unspent grant is required to
be held in the general fund and earmarked for that purpose next year. 
• Unspent third party contribution.  The council may receive a contribution
from third parties towards a project/work stream but the project spans
more than one financial year.  As with grant payments the contribution
would have to be repaid if not spent on the purpose it was intended for. 
In this instance, the unspent contribution is required to be held in the
general fund and earmarked for that purpose next year. 
• Unspent budget within the Devolved Management of Resources (DMR)
Scheme of Delegation for schools.   This allows for the carry forward of
unspent budget within schools, partly to give flexibility over the school
year as opposed to the Council’s financial year.  Unspent budget is
required to be held in the general fund and earmarked for the school
next year.  This carry forward operates within the agreed scheme of
delegation for school budgets. 
• CHORD funding.  Any budget allocated to the CHORD programme will
be ring fenced and any unspent balance at the year-end will be carried
forward to support the overall CHORD programme. 
• Existing Legal Commitments. 
• Scottish Government Initiatives. The council may receive additional
funding from the Scottish Government to implement new Government
initiatives or legislation. Any unspent funding at year end will be held in
the general fund and earmarked for that purpose next year. 
• Energy Efficiency Fund. Any savings generated from energy efficiency
measures are to be pooled for reinvestment in additional projects which
further reduce the Council’s energy costs and carbon emission levels.

Page 12

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
• Piers and Harbours Investment Fund. Additional fees and charges
income generated from Piers and Harbours operations are to be pooled
and used to meet the costs of the prudential borrowing required to
develop and maintain the Council’s harbour assets and infrastructure. 
• Hermitage Park.  The Hermitage Park regeneration project has a
significant investment from the Heritage Lottery Fund (HLF) which has
a requirement to have a 10 year Management and Maintenance Plan. 
This will be partly funded by existing Council revenue budgets but should
also be supplemented by any additional income which can be generated
from park activities.  Part of the HLF conditions are that all income
generated by the park should be retained to support the Management
and Maintenance Plan and a result of this requirement, any unspent
income generated by the park is retained for future years requirements. 
• One Council Property Team.  The corporate approach to managing
property has been in place since 2018 and historically any surplus above
budget will have been absorbed by the Service and ultimately gone to
the general fund.  This ring-fenced fund for One Council Property will
enable investment in the Council’s property portfolio to ensure it remains
fit for purpose. 
• Fleet - Timing Delay.  In 2020-21 year, there was a particular problem
with orders not being delivered because of manufacturing issues due to
the COVID-19 pandemic. This earmarking allows the value of fleet
orders submitted but not delivered due to supplier issues to be
automatically earmarked to offset the invoice when the order is received. 
• Electric Vehicle Charging Surplus – the fee was set in order to create a
surplus in order to allow future investment in charging points.  A new
automatic earmarking category is proposed to allow future electronic
vehicle charging points to be installed and maintained. 
3.4 Outwith these twelve situations noted above there will be no automatic carry
forward of unspent budget.  Any surplus arising from unspent budget within
departments/services will be pooled and transferred into the general fund
reserve. 
4. PROTOCOL FOR USE OF RESERVES 
4.1 There are exceptional circumstances where a proposal to earmark unspent
budget may be considered.  There is no set timetable for this.   
• The Council’s level of general reserve contingency must be fully met.

Page 13

APPENDIX 1 
FINANCIAL SERVICES
POLICY ON END OF YEAR FLEXIBILITY 
• The purpose for the earmarking must be linked to the objectives,
priorities and targets as set out in the Council’s Corporate Plan, Area
Plans and Service Plans. 
• There needs to be a business case that justifies the required
expenditure. 
• Consideration of the business case must take account of the future
budgetary and financial outlook in order not to place undue financial
pressure on the Council in the future. 
4.2 Any requests to earmark unspent budget based on the criteria above must be
submitted to the SMT in the first instance.  SMT would assess the proposal and
if it considers the proposal worthy of support would submit it to the Council with
a recommendation.  Proposals not supported by SMT will proceed no further. 
Kirsty Flanagan
Executive Director /Section 95 Officer
29 May 2024

Page 14

Appendix 2.1
With Business Cases
Ref Service Description New Earmarking Reason for Carry
Forward
Plans for Use Amount Planned
to be Spent in
2024/25
Amount Planned
to be Spent from
2025/26 onwards
Amount Planned
to be Spent from
2026/27 onwards
NON DEPARTMENTAL
001
Non Departmental Pay Inflation Contingency 1,700,000 Unspent Budget Negotiations for the 2024/25 pay award are ongoing but initial discussions suggest it
will be beyond the 3% increase currently built into the budget outlook. £1.7m equates
to approximately a 1% pay rise therefore providing a contingency at this level is prudent
1,700,000 0 0
002
Non Departmental Redundancy Costs 1,500,000 Unspent Budget Given the budget gap over the next 5 years and 61% of our costs being staff costs,
redundancy costs are likely to increase and there is a need to provide for possibillity of
covering those costs.
0 1,500,000 0
3,200,000 1,700,000 1,500,000 0
NEW Unspent Budget Proposals - 2023-24 Year End
Spending profile

Page 15

Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
REPORT BY EXECUTIVE DIRECTOR KIRSTY FLANAGAN  27 JUNE 2024
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
PAY CONTINGENCY 
1.  INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £1.7m be earmarked from the revenue budget underspend within
the Loans Fund in 2023-24 to create a 1% contingency for the pay award. 
2.2 
2.2.1 
2.2.2 
Business Case 
Negotiations for the 2024-25 pay award are ongoing but the initial offer has been
rejected by the Unions. 
A 3% pay award has been built into the budget outlook for 2024-25 (2% in future
years) and given how negotiations are progressing there is a high likelihood that this
will not be sufficient therefore it would be prudent to create a contingency of £1.7m
which equates to approximately a 1% pay rise.  
2.3  Expenditure Profile 
The sum of £1.7m will be spent during 2024-25. 
KIRSTY FLANAGAN 
S95 OFFICER/EXECUTIVE DIRECTOR

Page 16

Tick
One 
Box
For Information
Only
For Decision Only For Discussion 
x  
ARGYLL AND BUTE COUNCIL COUNCIL
REPORT BY EXECUTIVE DIRECTOR KIRSTY FLANAGAN  27 JUNE 2024
PROPOSAL TO EARMARK FUNDS FROM GENERAL FUND RESERVE
REDUNDANCY COSTS 
1.  INTRODUCTION 
1.1 The purpose of this report is to request support in earmarking unspent budget for a
specific purpose, in line with the Policy on End of Year Flexibility. 
2. DETAIL 
2.1 Initiative/Proposal 
2.1.1 It is proposed that £1.5m be earmarked from the revenue budget underspend within
the Loans Fund in 2023-24 to provide for possible redundancy costs.  
2.2 
2.2.1 
2.2.2 
Business Case 
The current reported budget gap in 2025-26 is £8.315m rising to £23.849m over the
next 5 years. As approximately 60% of our costs relate to staff it is likely that
redundancies will be unavoidable in order to bridge this gap therefore there is a need
to provide for associated redundancy costs. 
It would be prudent to earmark an additional £1.5m to provide for possible
redundancy costs.  
2.3  Expenditure Profile 
The sum of £1.5m will be spent from 2025/26 onwards. 
KIRSTY FLANAGAN 
EXECUTIVE DIRECTOR

Page 17

Appendix 2.2
Previously agreed
Ref Service Description New
Earmarking
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Amount
Planned to be
Spent from
2026/27
onwards
CHIEF EXECUTIVES UNIT
001 Community Planning Service Concessions - Priorities Investment Fund (Area Plans) 200,000 Unspent Budget
As agreed by Policy and Resources Committee on 23 October 23 - drawdown of
£200,000 from the Priorities Investment Fund to fund two temporary posts and
associated costs to produce meaningful area plans
100,000 100,000 0
EXECTIVE DIRECTOR (DOUGLAS HENDRY)
002 Commercial Services Commercial Investment Manager post and specialist consultant
technical resource (previously Asset Management Fund) 104,000 Unspent Budget
The Asset Management Fund has been redirected to Capital going forward but the
interest for 2023-24 is to be used towards a Commercial Investment Manager Post.  This
is because funding of £200k from the Asset Management Fund was agreed at ELT in June
22 for the post, along with specialist consultancy and technical resources  that will be
required to support early projects.  Note, the  £104k represents the balance of the £200k
commitment.
104,000 0 0
EXECTIVE DIRECTOR (KIRSTY FLANAGAN)
003 Development and Economic Growth Service Concessions - Priorities Investment Fund (Project Officer
for Housing Emergency) 200,000 Unspent Budget
As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£200,000 from the Priorities Investment Fund to fund a Project Officer to assist in
accelerating the work of the Housing Emergency.
70,000 130,000 0
004 Financial Services Revenue and Benefits BPR  - extra staff to implement savings
targets 86,955 Unspent Budget
On 23 February 2023, the Council agreed to the implementation of savings option
FIS2324-002 in relation to the Revenue and Benefits - Income Generation and Business
Process Review.   This included an extra 4 FTE of staff.  Delays in recruitment have
caused slippage in the allocated budget for these posts. 
86,955 0 0
005 Financial Services Scotland Loves Local 57,453 Unspent Budget
As agreed by Council 22 February 24, a £57,453 underspend from the Scotland Loves
Local scheme to be allocated to support measures to help with the costs of living by
funding member organisations of the Community Food Forum, ALI Energy, Argyll and
Bute Citizens Advice Bureau and Bute Advice Centre, with detailed proposals to be
agreed by the Executive Director with responsibility for Finance, in consultation with the
Leader, Depute Leader and Leader of the Largest Opposition Group. Details of the
agreed spend are to be reported to elected members.
57,453 0 0
006 Roads & Infrastructure Service Concessions - Biodegradable Municipal Waste (BMW) Ban 3,500,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Ensuring Argyll and Bute is able to
better address the challenges faced by a remote/rural/ island region in complying with
the forthcoming national BMW ban. 
0 3,500,000 0
007 Roads & Infrastructure Service Concessions - Priorities Investment Fund (Strategic
Development Framework) 450,000 Unspent Budget
As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of
£450,000 to procure consultancy support to assist in driving forward the Strategic
Development Frameworks.
225,000 225,000 0
008 Roads and Infrastructure Services Weather Incident costs not covered by Bellwin claim. 198,000 Unspent Budget
£839k was set aside at budget meeting in February 2024 as part of the unallocated
general fund balance workings to cover the weather incident costs not covered by the
Bellwin Claim.  As £641k was utilised during 23-24, the balance of £0.198m is being
earmarked for costs expected in 24-25.
198,000 0 0
NON DEPARTMENTAL
NEW Unspent Budget Proposals - 2023-24 Year End
Spending profile

Page 18

Ref Service Description New
Earmarking
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Amount
Planned to be
Spent from
2026/27
onwards
Spending profile
009 Non Departmental Service Concessions - Learning Estate Investment Strategy 8,000,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Signalling council’s commitment to
working in partnership to secure new schools for Argyll and Bute, through substantial
investment to support future-proofing of Argyll and Bute’s schools estate.
0 8,000,000 0
010 Non Departmental Service Concessions - Replace previous loans fund principal
repayment holiday 5,400,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit will
be used to replace exercising the principal repayment holiday that was previously agreed
by Council.
5,400,000 0 0
011 Non Departmental Service Concessions - Rothesay Pavilion 4,772,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Building on previous commitments to
securing a future for this building of international, national and local significance with
additional contribution to the overall funding target which requires collective action;
helping project to progress towards success with funding that supports completion of
certain work stages and securing wind/watertight status.
0 4,772,000 0
012 Non Departmental Service Concessions - Priorities Investment Fund 4,742,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Safeguarding future investment in
Priorities for Argyll and Bute by making long-term use of service concession gain to
establish dedicated fund to lever in, secure and support key strategic investments in this
year and future years.
0 4,742,000 0
013 Non Departmental Service Concessions - Roads Investment to Capital 3,546,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Augmenting overall allocation for roads
repair and maintenance programme with additional funds to bring up to £8m total
investment for 2024/25.
0 3,546,000 0
014 Non Departmental Funding Gap in Capital Programme 2,619,000 Unspent Budget Funding agreed as part of the Loans Fund Review towards the Funding Gap in Capital
Programme 2,619,000 0 0
015 Non Departmental Significant Strategic Change Projects 2,157,000 Unspent Budget Funding agreed as part of the Loans Fund Review for Significant Strategic Change
Projects 2,157,000 0 0
016 Non Departmental Service Concessions - Capital Projects Inflation Pressures 2,000,000 Unspent Budget
As agreed at Council meeting 23 February 2023 -Boosting resilience of Capital
Programme and providing added support as required for key capital/infrastructure
projects.
0 2,000,000 0
017 Non Departmental Service Concessions - Priorities Investment Fund (Capital
Programme) 1,028,000 Unspent Budget As agreed by Council on 22 February 2024- transfer of £1,028,000 from the Priorities
Investment Fund to the Capital plan 1,028,000 0
018 Non Departmental Service Concessions - New refuse collection vehicles 700,000 Unspent Budget As agreed at Council meeting 23 February 2023 - Enhancing waste and recycling uplift
arrangements through placing orders for new refuse vehicles. 700,000 0 0
019 Non Departmental Service Concessions - Climate Change 640,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Continuing our track record of investing
in climate change with funding to further enhance school estate climate change
measures, with allocations for primary and secondary schools across the area in
Campbeltown, Dunoon, Helensburgh, Lochgilphead, Oban and Rothesay.
0 640,000 0
020 Non Departmental Treasury Gain 294,000 Unspent Budget To fund one off operational saving 202425 003 as agreed by Council when setting
2024/25 budget in February 2024. 294,000 0 0

Page 19

Ref Service Description New
Earmarking
Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Amount
Planned to be
Spent from
2026/27
onwards
Spending profile
021 Non Departmental Service Concessions - New Jet Patcher Vehicle 250,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Complementing multi-million pound
capital investment in roads repair and maintenance with new jet patcher order to
support delivery of programme.
250,000 0 0
022 Non Departmental Service Concessions - New Road Marking Vehicle 230,000 Unspent Budget
As agreed at Council meeting 23 February 2023 - Completing suite of investments in new
fleet procurement, to support delivery of roads repair and maintenance programme,
with order for additional road marking vehicle.
0 230,000 0
41,174,408 12,261,408 28,913,000 0

Page 20

Appendix 3
Ref Service Description New Earmarking Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Amount
Planned to be
Spent from
2026/27
onwards
CHIEF EXECUTIVES UNIT
001 Community Planning Gaelic Development 7,736 Unspent Grant To fund Gaelic specific work and project work of the Community Planning Partnership
including the development of the new 10 year Outcome Improvement Plan 7,736
EXECTIVE DIRECTOR (DOUGLAS HENDRY)
002 Commercial Services Energy Efficiency Fund 20,000 Energy Efficiency Fund Additional funds from over recovery of Renewable Energy Income. The CEEF funding will
help fund further renewable energy projects. 20,000
003 Commercial Services Free Sanitary Provision Scheme 7,114 Unspent Grant
To fund the continued implementation of the scheme through increased provision of
reusable products, improved provision in rural communities by working in partnership
with Education and improving the storage of products in toilets so that they are more
readily available. A dedicated officer was appointed in November 2022 to develop the
scheme and increase provision across Argyll and Bute including a postage facility.
7,114
004 Education 100 Day Promise - Increase Teacher and
Pupil Support Assistant Numbers 732,164 Scottish Government
Initiatives
Scottish Government initiative to increase the number of teachers and support
assistants in schools. Required to fund teachers to end of academic year. 732,164
005 Education DSM - Devolved School Management
Scheme 644,837 DMR Schools To be spent in accordance with DSM regulations. 644,837
006 Education Early Learning and Childcare - 1140 Hours
(2023/24) 603,977 Unspent Grant
Continued provision of high quality early learning and childcare experiences to children
eligible for 1140 hours, in accordance with Funding Follows the Child and the associated
National Standard.
603,977
007 Education Expansion of Universal Free School Meals 395,985 Scottish Government
Initiatives
To support the continued phased implementation of Universal Free School Meals for
Primary children. 395,985
008 Education Pupil Equity Fund Carry Forward 303,820 Unspent Grant
To provide targeted support for children and young people affected by poverty to
achieve their full potential.  Funding is used over the academic year. 303,820
009 Education Strategic Equity Fund 94,712 Unspent Grant
Strategic Equity Funding must provide targeted support for children and young people
(and their families if appropriate) affected by poverty to achieve their full potential,
focusing on targeted improvement activity in literacy, numeracy and health and
wellbeing. The Strategic Equity Fund Spending Plan will enhance staffing, provide
teacher cover and support to schools not in receipt of PEF funding, to be spent by the
end of the 2024-25 academic year.
94,712
010 Education Scottish Milk and Healthy Snack Scheme
(SMHSS) 68,061 Unspent Grant
The Scottish Milk and Healthy Snack Scheme funds a daily portion of plain fresh cow’s
milk (or specified alternative) and a healthy snack (fruit or vegetables) for pre-school
children spending 2 hours or more in the care of a regulated day care provider and/or
childminders that has registered for the Scheme.  The unspent grant from 2023/24 will
contribute towards the cost of the scheme in 2024/25.
68,061
NEW Automatic Carry Forward Earmarkings - 2023-24 Year-end
Spending profile

Page 21

Ref Service Description New Earmarking Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Amount
Planned to be
Spent from
2026/27
onwards
Spending profile
011 Education EDU - Music Instructors 36,094 Scottish Government
Initiatives
Scottish Government Initiative to support music tuition. Unspent amount designated for
expansion of the service within the 2023-24 academic year. 36,094
012 Education Access to Counsellors in Schools 35,769 Scottish Government
Initiatives
Government initiative to support delivery of the access to school counselling service, in
line with the commitment set out in Programme for Government. The delivery of the
service will enable children and young people to be supported with issues affecting their
mental health and wellbeing.
35,769
013 Education Youth Music Initiative 34,348 Unspent Grant To fund YMI projects across the remainder of the academic year 2023/24. 34,348
014 Education Training of Support Staff in Schools 12,000 Scottish Government
Initiatives
To fund training of support staff in schools in light of the findings of the Behaviour in
Scottish Schools Research 2023 12,000
015 Education Planet Youth Funding 4,350 Unspent Grant Balance of 23-24 grant funding to be used for drama production within schools taking
place in September 2024. 4,350
016 Education EDU - Support Fund for Service Children 3,557 Unspent Grant
This grant is provided by the Armed Forces Covenant Trust and will be used to provide
continuing support and resources for Service Children within the Helensburgh and
Lomond Area in academic year 23-24.
3,557
017 Education Play on Pedals 1,584 Unspent Grant
Unspent Play On Pedals grant to allow the procurement of a fleet of cycles and helmets
to support delivery across up to 19 nurseries, as well as other equipment and
maintenance.
1,584
018 Education Food for Thought 1,203 Unspent Grant Ardrishaig Primary £800 and Gigha Primary & ELC £403 have orders pending and plans
for the remaining balance of the Food for Thought Grant.  Will be spent in 2024-25 1,203
019 Education Developing The Young Workforce 598 Unspent Grant The Developing the Young Workforce Grant claim had to be made in advance and at the
end of the financial year there was surplus of £598 which requires to be carried forward. 598
020 Education Transport for 'Smoke Free Me' Drama
Production 0 Unspent Third Party
Contribution
NHS funding contribution towards the cost of school transport for pupils attending the
Smoke Free Me drama production which was delivered across Argyll and Bute. 0
021 Legal & Regulatory Support Meridian BCMS (Business Continuity
Management System) 57,176 Previous Council
Decision - Other
Meridian BCMS (Business Continuity Management System)
For period covering: 19th February 2024 – 18th February 2027
Civil Contingencies System, this earmarking will be used over the next 6 years for
maintenance costs for Meridian BCMS
19,800 19,800 17,576
022 Legal & Regulatory Support LRS - Housing Services - Welfare Rights 43,760 Unspent Grant
Grant agreement between the Improvement Service and Argyll and Bute Council for
participation in the Welfare Advice and Health Partnerships- ‘Test and Learn’
Programme
43,760
EXECTIVE DIRECTOR (KIRSTY FLANAGAN)
023 Customer Support Services Bord na Gaidhlig 12,800 Unspent Grant
Grant funding from Bord na Gaidhlig. Ongoing spend ad hoc to deliver on commitments
in the Gaelic Language Plan. Grant income from GLAIF continues to be added to this
total and then paid out to projects.
0 0 12,800
024 Development & Economic Growth Coastal Communities Fund (Crown Estates) 838,000 Unspent Grant 2023-24 grant funding for Coastal Communities Fund (Crown Estates). 0 838,000 0

Page 22

Ref Service Description New Earmarking Reason for Carry
Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent from
2025/26
onwards
Amount
Planned to be
Spent from
2026/27
onwards
Spending profile
025 Development & Economic Growth Scottish Government Islands Programme 646,045 Unspent Grant 2023-24 grant funding for Scottish Govt Islands Programme. 646,045 0 0
026 Development & Economic Growth Place based investment programme 407,741 Unspent Grant 2023-24 grant funding for Place Based Investment Programme. 407,741 0 0
027 Development & Economic Growth UK Shared Prosperity Fund (UKSPF) 294,440 Unspent Grant 2023-24 grant funding for UK Shared Prosperity Fund (UKSPF). 294,440 0 0
028 Development & Economic Growth Short Term Lets 232,604 Unspent Third Party
Contribution
These monies are to fund the STL licensing scheme until the renewal period of 27/28 as
the majority for the licences will have renewal dates of 2027. There will also be ongoing
staffing costs, maintenance fees for ICT systems and ongoing fees associated with short-
term let licensing. Income from the scheme is intended to be directed to delivering the
licensing scheme
0 0 232,604
029 Development & Economic Growth Rothesay Pavilion 120,596 CHORD Build up a provision towards future Council commitment to provide up to £150,000 per
annum running costs for Rothesay Pavilion. 0 0 120,596
030 Development & Economic Growth Island Skills and Repopulation 8,953 Unspent Grant 2023-24 grant funding for Island Skills and Repopulation 8,953 0 0
031 Financial Services FIS - BEIS Energy Grants 27,590 Unspent Grant
Grant monies which would have to be repaid if not utilised for intended purpose,
Additional staff to cover pressures of administering double charge of council tax in 2nd
homes £28k
27,590
032 Roads and Infrastructure Services Piers and Harbours Investment Fund 1,335,720 Piers and Harbours
Investment Fund
Income from P&H to be used to pay of Prudential Borrowing costs for Harbour
Investment Programme. 1,335,720
033 Roads and Infrastructure Services Hermitage Park 37,445 Hermitage Park
The Hermitage Park regeneration project has a significant investment from the Heritage
Lottery Fund (HLF) which has a requirement to have a 10 year Management and
Maintenance Plan.  This will be partly funded by existing Council revenue budgets but
should also be supplemented by any additional income which can be generated from
park activities.  Part of the HLF conditions are that all income generated by the park
should be retained to support the Management and Maintenance Plan and a result of
this requirement, any unspent income generated by the park is retained for future years
requirements.
0 11,858 25,587
NON DEPARTMENTAL
034 Non Departmental Strategic Housing Fund 2,575,067 Strategic Housing Fund
Strategic Housing Fund. Council tax collected during 2023-24 from the second homes
discount on properties. Requires to be earmarked as part of the Strategic Housing Fund
balance.
2,575,067
035 Non Departmental Oban TIF 787,620 Previous Council
Decision - Other
Will be used to fund the TIF Programme office for a further 3 years as well as the
programme office for Rural Growth Deal beyond the funding that was agreed at Council
for this in February 2021.
787,620
036 Other Operating Income and
Expenditure
Educational Support to Ukrainian Children
and Young People 124,491 Unspent Grant This funding will be used to provide childcare and education support to Ukrainian
children and young people. 124,491
10,557,957 4,580,729 869,658 5,107,570

Page 23

Previously Agreed Earmarked Balances Appendix 4
Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
Completed projects during 2023/24 1,771,000 1,771,000 0 Capital Projects 0 0 0
Completed projects during 2023/24 51,371 51,371 0 Unspent Grant 0 0 0
Completed projects during 2023/24 1,129,677 1,129,677 0 DMR Schools 0 0 0
Completed projects during 2023/24 16,560 16,560 0 Electric Vehicle
Charging Surplus
0 0 0
Completed projects during 2023/24 91,461 91,461 0 Previous Council
Decision
0 0 0
Completed projects during 2023/24 1,495,000 1,495,000 0 Previous Council
Decision - Other
0 0 0
Completed projects during 2023/24 1,028,668 1,028,668 0 Scottish
Government
Initiatives
0 0 0
Completed projects during 2023/24 1,464,802 1,464,802 0 Unspent Budget 0 0 0
Completed projects during 2023/24 900,181 900,181 0 Unspent Grant 0 0 0
CHIEF EXECUTIVE'S UNIT
001
Community Planning NHS Highland and other CPP Partners
Contribution Towards the CPP
Running and Project Costs
113,368 30,000 83,368 Unspent Third
Party Contribution
Will be deployed as required in the day-to-day running of the Community Planning
Partnership's operations.
83,368 0 0
002 Community Planning Community Planning - temp post to
support communities
55,000 0 55,000 Unspent Grant Post relating to the supporting communities fund, will be used in 2024-25 55,000 0 0
003
Community Planning Covid impacts – support to
communities’
49,147 21,221 27,926 Unspent Grant Funding provided in relation to the Local Self-Isolation Assistance Service.  The Community
Planning and Development Team will work with community groups to support their
community response and resiliency to Test and Protect and the longer term impacts of COVID-
19 on local community organisations.
27,926 0 0
004
Community Planning Gaelic Development 19,754 0 19,754 Unspent Grant To fund Gaelic specific work and project work of the Community Planning Partnership
including the development of the new 10 year Outcome Improvement Plan. 
19,754 0 0
005
Community Planning Recovered unspent third sector grant
funding.
10,846 7,909 2,937 Previous Council
Decision - Other
To be distributed through the Supporting Communities Fund for communities based projects
across Argyll and Bute.
2,937 0 0
006
Community Planning Communities and Partnership Team 8,855 0 8,855 Unspent Budget The funds have originated from externally sourced income due to an employee being
seconded to the Scottish Community Development Centre (SCDC).  The funds will be used to
support the team in relation to meeting its priorities of Building Back Better (Communities),
Climate Change and the review of the Argyll and Bute Outcome Improvement Plan.
8,855 0 0
EXECUTIVE DIRECTOR DOUGLAS HENDRY
007
Across Services / Commercial Services Information Management (Estates
Survey Work)
12,697 0 12,697 Unspent Budget To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of change as
outlined in the BV Review.  The planned initiatives include: Estates Survey work £122k,
Digitalisation of Title Deeds £92k, document management and workflow system for Planning,
Building Standards and Environmental Health £77k and a balance of funding to explore
information management solutions in a strategic and coherent way £209k. This balance
relates to Estates Survey Work. Having a procured supplier to provide floor plans at short
notice is required to be able to react quickly to requests. If this isn't available Estates would
need to go through the procurement process again which would delay any projects by several
months. There isn’t a detailed plan to use this resource it is more about being able to react
quickly and not delay projects.
12,697 0 0
008
Across Services / Education Digital Projects (Supply Staff Booking
System)
25,100 9,900 15,200 Unspent Budget To deliver a number of Digital Service Transformation Projects with a commitment of £0.035m
towards a Supply Staff Booking system.  Phase 1 of the project is nearing completion.
9,900 5,300 0
Spending profile

Page 24

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
009
Commercial Services Rothesay Academy - Demolition and
Waste Disposal
953,875 73,655 880,220 0 Unspent Budget Since Rothesay Academy was vacated over 15 years ago no site clearance has taken place and
there are potential Health and Safety and insurance cover implications due to deterioration of
the building. £55,000 earmarking has allowed clearance of remaining materials and debris.
Also £840,000 to fund estimated future costs of demolition (subject to removal of listed
status) to be added to an existing earmarking . There are potential Health and Safety and
insurance cover implications due to deterioration of the building.
Balance of earmarking being released towards Capital Budget pressures.
0 0 0
010
Commercial Services Rothesay Pavilion Charity 750,000 0 750,000 Previous Council
Decision
Agreed at Council meeting February 2020, £750k additional revenue support subject to
conditions which seek to minimise the risk to the Council as far as is reasonably practicable
including requirement for adequate business and financial management and regular reporting
by RPC.  This funding is to support Rothesay Pavilion Charity in the first 2 years of the building
being operational.
0 750,000 0
011
Commercial Services One Council Property 565,971 0 565,971 0 One Council
Property Team
It was agreed in 2020/21 to retain revenue generated from commercial activity in One Council
Property for future investment across the Council’s property portfolio to ensure it remains fit
for purpose.
0 0 0
012
Commercial Services Climate Change Programme 500,000 50,000 450,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the Council committed to additional
investments with £0.500m for Climate Change, building on previous £1.1m investments,
including projects within Argyll and Bute’s schools.  Expenditure in 23/24, draw down in 24/25.
450,000 0 0
013
Commercial Services Contingent Liability - Capital Project 438,691 0 438,691 0 Existing Legal
Commitments
There is a contingent liability in respect of Helensburgh capital projects with future costs
expected for fees relative to court proceedings and remedial works required to be carried out,
the extent of which are still unknown.
0 0 0
014
Commercial Services Rothesay Pavilion Essential repairs 306,400 0 306,400 Previous Council
Decision
Essential repairs to deal with potential health and safety risks and to avoid further
deterioration.  Budget provision was approved by the Policy and Resources Committee on 21
August 2014.  
0 306,400 0
015
Commercial Services Energy Efficiency Fund 218,351 0 218,351 Energy Efficiency
Fund
The Central Energy Efficiency Fund (CEEF) was launched by SG in 2004 to support the delivery
of energy efficiency and renewable energy measures.  The original  allocation of funding was
£286k and part of the stipulation of the funding was that any savings from energy efficiencies
were reinvested into the fund in energy efficiency measures.  The terms and conditions
attached to the fund expired on 31 March 2016, however there is an expectation that local
authorities will maintain a revolving energy efficiency fund to support future carbon reducing
projects. Projects expected to commence in 24-25 are Drainage Adaptations, Water Efficiency
Works within PCs and Schools and Remote Energy Monitoring Systems.
218,351 0 0
016
Commercial Services Estates - NDR Revaluation Appeals 84,688 24,750 59,938 Unspent Budget
The Council agreed to make provision to meet the cost of appealing Non Domestic Rates
(NDR) revaluations which were imposed from April 2017. The remaining funds were carried
forward to the 2023/24 revaluation cycle however a recent change in position by the Scottish
Government may restrict the appeals which can be made. This is still under discussion and
Gerald Eve Surveyors have been appointed as specialist advisers on this matter, who are
progressing 2023-26 appeals. In the event that appeals are limited there may be an
opportunity to utilise Gerald Eve for more general valuation advice subject to Procurement
approval.
29,969 29,969 0
017
Commercial Services Site Investigation Works 21,013 0 21,013 Unspent Budget For Site Investigation works in relation to Tweeddale Street Car Park and Oban Airport
Business Park, exploring commercial opportunities to develop the sites and raise revenue
income for Argyll and Bute Council. HUB North were instructed to procure contractors to
undertake the site investigations these are now complete. The remainder of the budget is
intended to be utilised for other site investigation and pre-development works to further
develop commercial opportunities across the council area.
21,013 0 0
018
Commercial Services Mid Argyll Community Pool 0 0 30,000 30,000 Unspent Budget At the Council Budget meeting on 22 February 2024, the Council committed to a one-off
investment of £0.030m to Mid Argyll Community Pool in response to an external funding
request.
30,000 0 0
019
Commercial Services MacTaggart Leisure Islay 0 0 30,000 30,000 Unspent Budget At the Council Budget meeting on 22 February 2024, the Council committed to a one-off
investment of £0.030m to MacTaggart Leisure, Islay in response to an external funding
request.
30,000 0 0
020
Education EDU - Early Learning & Childcare -
1140 Hours Expansion
5,531,378 1,396,358 4,135,020 Unspent Grant The funds will be utilised to improve and expand the Argyll and Bute Early Years Delivery Plan
for 1140 hours which will increase access to affordable Early Learning and Childcare across the
Council area. There is a detailed plan of spend which has been shared with S95 officer and
Head of Finance.  The Scottish Government were happy for us to move ahead with plan
instead of losing funding.  For 2024-25 the ring fencing has been removed, however the
wording of the letter states funds must still be used for Early Years.
1,769,739 2,365,281 0

Page 25

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
021
Education ASN Review 1,255,000 0 1,255,000 Unspent Budget To fund capital costs of ASN adaptations as part of ASN Review to increase equity of provision
across Argyll and Bute.  This will be subject to a business case as part of the wider ASN review.
Update: Business case now approved and working group set up with quotes for works being
carried out Jan 2024.
1,255,000 0 0
022
Education Provision for Learning Estate
Investment Programme
1,000,000 0 1,000,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the Council committed to additional
investments - £1m to help safeguard and support future learning for Argyll and Bute's
Learning Estate Investment programme. Update: The LEIP funding bid was approved by SG
late 2023. Council approval granted at 25th April 2024 meeting to commence business case,
undertake engagement exercises and site selection process.
1,000,000 0 0
023
Education Expansion of Universal Free School
Meals
876,208 43,530 832,678 Scottish
Government
Initiatives
To support the continued phased implementation of Universal Free School Meals for Primary
children.
0 832,678 0
024 Education Reduced Teacher Staffing Costs -
Strike Action
800,000 0 800,000 Unspent Budget To fund one off savings in 2024-25 from the underspend in staffing from strike action. 800,000 0 0
025
Education Logistics Funding - Safe Opening of
Schools
699,036 199,036 500,000 Unspent Grant Scottish Government funding to ensure the safe opening and operation of schools. Includes
transport, PPE, cleaning, ventilation and expansion of estate. It is likely that any unused
balances would have to be returned to the Scottish Government. Window replacement
programme in schools with windows that do not open, this will improve ventilation.  £500k to
fund one off savings 2024-25.
500,000 0 0
026 Education Pupil Equity Fund Carry Forward 565,097 558,701 6,396 Unspent Grant To provide targeted support for children and young people affected by poverty to achieve
their full potential.  Funding is used over the academic year.
6,396 0 0
027
Education Additional Support Needs - Additional
Support for Learning Project
510,142 202,274 307,868 Scottish
Government
Initiatives
Government initiative to support the provision of support staff in schools as part of 'Support
for Additional Support for Learning Implementation'. The funding will be used to supplement
the ASN Assistants budget 24-25 by funding additional support need hours required due to a
lack of local specialist provision in some areas, as well as for vital training for visual and
hearing impairment specialists which a significant number of Argyll and Bute's children
require.
307,868 0 0
028
Education Additional Teaching/Support in
Schools/Digital Devices/Family Home
Learning Support Fund - £45m Grant
421,198 70,024 351,174 Unspent Grant Continuation of funding for additional staffing, teachers, support staff, additional devices for
pupils and additional family/home learning programmes.
42,552 308,622 0
029
Education Access to Counsellors in Schools 339,482 0 339,482 Scottish
Government
Initiatives
Government initiative to support delivery of the access to school counselling service, in line
with the commitment set out in Programme for Government. The delivery of the service will
enable children and young people to be supported with issues affecting their mental health
and wellbeing. The service is currently seeking the views of head teachers around the need for
increased counselling for under 10s.  Service is also engaged in multi-agency discussions
around the development of a single point of access and the School Counselling monies will
help support the development of this in collaboration with HSCP.
339,482 0 0
030
Education 21-22 Unspent Budget within DSM
Earmarkings
264,037 170,743 93,294 DMR Schools Additional unspent budget earmarkings included within 21-22 DSM balance. Remaining
balance will fund ASN adaptations and Lead Teacher/Virtual Head Teacher post.
93,294 0 0
031
Education (2023 Digital Projects) School WiFi
Upgrades
200,000 33,076 166,924 Unspent Budget To extend WiFi coverage within school settings through the purchase of additional hardware
such as access points, switches and other networking hardware. This will result in more
flexible learning spaces and support the growing number of devices within schools. Project
now underway and if budget not fully utilised it is hoped that the balance could be diverted to
assist with Capital costs of Education Network Paper.
166,924 0 0
032
Education Education to Support Young People 191,042 136,225 54,817 Unspent Grant As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.600m. 
Agreed to fund a package of measures to boost the wellbeing and build back the resilience of
young people, in particular those most vulnerable, following the Covid-19 pandemic, including
counselling and increased provision of childcare for children under three. Remaining balance
is funding a teaching post, an outreach worker and training to support schools in 24-25. 
54,817 0 0
033
Education Education Transformation Fund 146,579 1,942 144,637 Unspent Budget At the Council meeting on 27 February 2020, it was agreed to input £400k into Education
Digital Learning.  The additional funds have been spent in 20/21, 21/22 and 22/23 as part of
the ongoing transformation work in the Education service, focussing on digital and virtual
learning technology and the development of learning clusters. 
0 144,637 0
034
Education MCR Pathways Pilot 80,000 0 80,000 Unspent Budget Funding to support implementation of MCR Pathways mentoring programme within three
secondary schools for 2023-24 academic year. Funding will allow the employment of a
dedicated Co-ordinator within each setting to develop and implement the programme which
is designed to benefit care experienced and other disadvantaged pupils through targeted
mentoring support.
80,000 0 0

Page 26

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
035
Education Scottish Government Initiatives:
Developing the Young Workforce
GIRFEC
Languages 1+2
37,478 0 37,478 Scottish
Government
Initiatives
Developing the Young Workforce: Developing an Argyll and Bute foundational apprenticeship
scheme, developing support for vulnerable young people to access training, developing key
group knowledge of the local labour market in relation to post-school opportunities and
delivering a prevocational programme for unemployed young people.  Grant received from
the Scottish Government for this purpose.  GIRFEC: This grant funding is for the specific
purpose of supporting Argyll and Bute’s contribution to implementing GIRFEC and the Children
and Young Person (Scotland) Act to ensure compliance with legislation.  Activity in Argyll and
Bute will include developing specific resources, staff training and development, protocols and
procedures in line with the GIRFEC practice model and national guidelines.  Languages 1+2:
Grant provided for implementing  the Scottish Government's 1+2 languages policy for Primary
schools.  The Scottish Government have confirmed that any unspent funding can be put into
reserves for spend later. 
0 37,478 0
036
Education Scottish Attainment Challenge - Care
Experienced CYP Funding
34,541 20,660 13,881 Unspent Grant To provide targeted support for care experienced children and young people to achieve their
full potential. The balance funds a Virtual Head Teacher and Health and Wellbeing Family
Support Workers. Earmarked funding is allowing the Virtual HT to create impact both within
Education but also to drive forward work around The Promise across partners and other
services.
13,881 0 0
037
Education Gaelic Specific Grant / Languages 1+2 30,000 0 30,000 Unspent Budget Gaellic Specific Grant £30k - This earmarking refers to the Council contribution towards the
Gaelic grant for 22-23 and will fund the costs of Gaelic Language Principal Teacher in 24-25
academic year.
30,000 0 0
038 Education (2023 Digital Projects) Cashless
Catering
30,000 0 30,000 Unspent Budget To support the ongoing implementation of the new cashless catering system during the
testing and roll out phase.
10,000 20,000 0
039
Education Languages 1 + 2 28,056 0 28,056 Scottish
Government
Initiatives
Languages 1+2: Grant provided for implementing  the Scottish Government's 1+2 languages
policy for Primary schools.  The Scottish Government have confirmed that any unspent
funding can be put into reserves for spend later and will fund the costs of Gaelic Language
Principal Teacher in 24-25 academic year.
0 28,056 0
040
Education Schools ADP Grant 19,000 0 19,000 Unspent Grant Providing social and emotional support to pupils who are affected by drugs and alcohol. 
Funding previously provided by NHS for ADP work - we now have agreement from them to
use the funding towards the Planet Youth project which will be opened up to secondary
schools in 2024-25.
19,000 0 0
041
Education Bord Na Gaidhlig -
Parental/Community Gaelic Upskilling
Project
12,720 0 12,720 Unspent Third
Party Contribution
This funding was used for Gaelic Classes and Support being delivered in the academic year
21/22. An issue with invoicing at the supplier end has delayed the payment for this project and
discussions are ongoing between the service and the supplier to resolve. A new invoice has
been requested by the end of 23/24. If there is an underspend, the balance of grant will be
returned or utilised for something else if permitted.
12,720 0 0
042
Education Skype for Business for Education /
Digital Projects (Skype for Business)
10,000 0 10,000 Unspent Budget To fund the initial capital costs for the implementation of Skype for Business for Education. 
This will bring the Education service in line with other council departments and will improve
staff collaboration and modernise school telephony to deliver the  service more efficiently and
cost effectively.
0 10,000 0
043
Education Transport for 'Smoke Free Me' Drama
Production
2,000 1,395 605 Unspent Third
Party Contribution
NHS funding contribution towards the cost of school transport for pupils attending the Smoke
Free Me drama production which was delivered across Argyll and Bute. Balance to be put
towards Sept 2024 production.
605 0 0
044 Education Education Learning Estate Condition
Surveys
1,815 0 1,815 Unspent Budget To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for prioritised
School Buildings.
1,815 0 0
045 Education COVID 19 - CO2 Monitors 97 0 97 0 Unspent Grant To continue the work of providing CO2 monitoring in schools and  day care settings to mitigate
against the risks of airborne transmission of COVID-19.
0 0 0
046
Legal and Regulatory Support Education Purchasing Officers 210,000 0 210,000 Unspent Budget The earmarked funds will be used to fund an education purchasing team within the
Procurement Service for two years.  The team will embed good procurement practice, train
headteachers on current procurement process requirements, develop spend plans that
evidence best value.
168,000 42,000 0
047
Legal and Regulatory Support Welfare Rights Support 131,634 64,906 66,728 Unspent Grant As agreed at the Council Meeting on 25 February 2021 - an allocation of £0.172m.  As part of
our focus on Improving Opportunities for People and Communities, agrees to provide
additional resources to proactively support people experiencing poverty and hardship, by
investing in two additional Welfare Rights support staff for two years.
66,728 0 0
048
Legal and Regulatory Support (2023 Digital Projects) Replacement
of Council Chambers Online Meeting
Equipment
130,000 79,929 50,071 Unspent Budget Current online meeting system  is less than resilient and has failed on a number of occasions,
leading to issues at strategic committees. A condition assessment by the incumbent
maintenance contractor has highlighted that the current equipment is now at end of life and
unsupportable due to the  obsolescence of the system. Discussions with ICT have taken place
to identify a simpler more robust solution to be procured.
NUWAY system and maintenance, system installed, ongoing maintenance contract to 2030
5,353 44,718 0

Page 27

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
049
Legal and Regulatory Support CCTV Maintenance 99,570 4,239 95,331 Unspent Grant Maintenance of CCTV systems.  Funds transferred from external bodies (Police Scotland) to
maintain systems for future years Council Decision of 20 Sept 2007.  Merged with funds from
Community Safety Partnership to be used for Community Safety Partnership purposes.
47,500 47,831 0
050
Legal and Regulatory Support Information Management
(Digitalisation of Title Deeds)
92,000 0 92,000 Unspent Budget To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of change as
outlined in the BV Review.  The planned initiatives include: Estates Survey work £122k,
Digitalisation of Title Deeds £92k (delay on spending due to COVID-19), document
management and workflow system for Planning, Building Standards and Environmental Health
£77k and a balance of funding to explore information management solutions in a strategic and
coherent way £209k
92,000 0 0
051
Legal and Regulatory Support Councillor IT Equipment 44,557 0 44,557 Unspent Budget There is currently no budget for the provision and renewal of IT equipment for members. The
earmarking identifies a resource to utilise spend for that purpose to ensure that members
have continued support in maintaining and replacing vital IT equipment.
22,000 22,557 0
052
Legal and Regulatory Support Digital Projects: Hybrid Council
meetings
43,302 0 43,302 Unspent Budget The funding will be used to maintain the ICT equipment used to support the provision of on-
line and hybrid Council meetings.  Will be used to fund Public-I licence over 3 years - for
livestreaming Council meetings.
11,639 31,663 0
053 Legal and Regulatory Support Debt Counselling & Welfare Rights 21,452 0 21,452 Unspent Budget To meet the cost of a Debt Counselling and Welfare Rights Management System. 5,265 16,187 0
054
Non Departmental / Legal and
Regulatory Services
Community Resilience Fund 76,447 4,448 71,999 Previous Council
Decision
Fund established in 2012/13 to be spent over more than one year. Fund reduced at the
Council meeting on 11 February 2016.  Used to cover the costs of emergency phone lines and
a contract with Aggreko for generators if required in an Emergency Planning/Civil
contingencies incident.  These costs amount to approximately £5k per year.
5,000 66,999 0
EXECUTIVE DIRECTOR KIRSTY FLANAGAN
055 Across Services / Customer Support
Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 0 0 63,455 Unspent Budget To complete one of a number of Digital Service Transformation projects with a commitment of
£0.064m to increase Schools Bandwidth. 
63,455 0 0
056
Across Services / Customer Support
Services
Digital Projects (Replacement
Learning Management System)
11,470 0 11,470 Unspent Budget To deliver a number of Digital Service Transformation Projects with an original commitment of
£0.030m towards a replacement Learning Management System £0.030m.  This money will be
used to pay for consultancy for an interface between itrent and totara. Profiled for 24/25
based on decision to do a phased implementation of itrent.
11,470 0 0
057
Across Services / Development and
Economic Growth
Information Management (Document
Management and Workflow for
Planning, Building Standards and
Environmental Health)
21,177 0 21,177 Unspent Budget Hoping to implement the replacement for IDOX in March 2024 but there have been severe
issues/delays with the new programme
21,177 0 0
058
Customer Support Services Microsoft Licensing Costs 912,888 112,373 800,515 Previous Council
Decision - Other
To meet  licensing and set-up costs for the Microsoft 365 rollout.  The spend is profiled and
reported to MS365 board each month. Currently projecting £50k 23/24, 189k 24/25, 193k
25/26 and 367k in 26/27 but all subject to change if licence upgrades are required for Power BI
or Teams Telephony.
189,000 611,515 0
059
Customer Support Services ICT computer replacement 531,000 0 531,000 Previous Council
Decision
At the Council Budget meeting on 23 February 2023, the Council committed to supporting the
council's digital resilience and overall efficiency with investment in ICT assets.  £88k will be
drawn down in 24-25 for expenditure incurred in 23-24, £323k drawn down in 25-26 for
expenditure planned in 24-25 with the balance of £120k drawn down in 26-27.
88,000 443,000 0
060
Customer Support Services (2023 Digital Projects) iTrent Project 332,000 11,445 320,555 Unspent Budget Combination of parallel running of the new iTrent system alongside the legacy systems for up
to 18 months whilst iTrent is implemented and additional staffing resource to implement
iTrent in late June 2024 and support staff for the first 3 months of operation through summer
2024. Total includes £73k from Financial services for funding additional staffing resource to
implement the payroll components of the iTrent HR and Payroll System by the end of June
2024 and support staff for the first 3 months of operation during summer 2024.
320,555 0 0
061
Customer Support Services Skills Development Scotland 150,936 0 150,936 Unspent Grant We receive the money from Skills Development Scotland (SDS) to enable us to deliver
Foundation and Modern Apprenticeship programmes.  The money covers the salaries of the
two Tutors we employ and also any materials we require to deliver the programmes.  Update: 
This is being spent on contract overlaps around the move from Resourcelink, Crown, Iken to
ITrent.  Spend reprofiled for 2024/25 following delays in itrent project.
100,936 50,000 0
062
Customer Support Services Security Operations Centre
Subscription
113,594 42,406 71,188 Unspent Budget There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost
pressure being added to the ICT revenue budget to cover the costs from 2025-26 onwards. 
71,188 0 0

Page 28

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
063
Customer Support Services Growing our Own and Modern
Apprentices
109,150 0 109,150 Unspent Budget Funding earmarked to support trainee development and modern apprenticeship opportunities
based on priority workforce risk areas.  A Trainee Regulatory Services post has been proposed
by the manager who was unable to secure a suitable candidate for the original advert. The
spend would be spread over 24/25 and 25/26 once a suitable candidate is in post
44,000 65,150 0
064
Customer Support Services Self Isolated Support / Self Isolated
Support Grant (HR)
65,250 49,750 15,500 Unspent Grant The funds are being used for a number of Customer Service and Business efficiency related
projects including a system and consultancy of RPA (robotic process automation) and
application development.  A full corporate website upgrade and renewal using specialist web
resources and the Digital Reception Project.  Specific commitments from the balance are:  
£3,600 PO issued for additional consultancy with Netcall on Oban Airport Payments project
and £11,900 will be spent on procurement of Digital Registration Platform with contract award
due FQ1, 24-25.
15,500 0 0
065
Customer Support Services (2023 Digital Projects) Digital Project
Officer
60,000 25,879 34,121 Unspent Budget Employ a temporary Digital Project Officer as part of OD changes - additional member of staff
required to action changes, unable to recruit so existing staff increasing hours.
34,121 0 0
066
Customer Support Services (2023 Digital Projects) Resilient
Website Project
60,000 0 60,000 Unspent Budget Cybersecurity action to move to a cloud based website platform that would improve resilience
and enable service continuity in the event of a cyber attack.  Procurement in progress for
resilient website solution and Scotgov Cloud Services Project providing input. Contract Award
expected by end 2023. Procurement in progress for resilient website solution.   Contract
Award expected FQ1 2024-5 and full £60k spend in that year. Payment milestones in CARR will
be 25% on Contract Award, 25% on Cloud Site Provisioning, 25% on Site migration and 25% on
full go live cutover.
60,000 0 0
067
Customer Support Services Implementation of Gaelic Language
Plan
30,000 0 30,000 Previous Council
Decision
Agreed at Council Meeting February 2021.  Provision of funding for delivery and
implementation of the council’s Gaelic Language Plan in recognition of the contribution that
Gaelic makes to economic growth and to the tourism sector, and to enable delivery of key
activities within the plan which currently receive no revenue funding.  In discussion with Bord
na Gaidhlig about a 3-year Gaelic Plan funding programme as opposed to individual grant
applications for specific projects. This earmarking would be used to provide match funding for
that 3 year programme of projects.
10,000 20,000 0
068
Customer Support Services (2023 Digital Projects) Digital
Engagement Services Developer
28,000 12,323 15,677 Unspent Budget To fund 50% of a new temporary LGE10 post.  The post is a Digital Engagement Services
Developer that will be provide capacity to deliver service efficiencies through the use of the 
new CREATE/RPA software.  The other 50% of the post can be funded from a current vacancy. 
15,677 0 0
069
Customer Support Services Business Development Training 27,601 576 27,025 Unspent Budget £27k budget from original Business Development Training earmarking remaining at 31/03/24. 
This budget is funding ongoing leadership development, coaching, action learning sets and
commissioned training including Priority Management.
10,000 17,025 0
070
Customer Support Services Learning and Development 19,436 0 19,436 Unspent Budget In order to maximise the opportunities and efficiencies of digital learning, this funding will be
used to support the extension of digital learning in order to deliver the Digital Learning
Strategy, which was approved in FQ4 20/21. This money is to support the additional digital
learning capacity required to build online elements of AB365 and other key digital learning as
we increase our digital learning offering linked to the digital skills survey and review of
corporate training. Delays in recruitment meant this has been reprofiled for spend in 24/25
10,000 9,436 0
071
Customer Support Services Establishing HR Service Centre 13,824 0 13,824 Unspent Budget To facilitate the implementation of technical efficiency improvements and new processes. 
This money will be used to support phase two of the itrent project.  Spend reprofiled for
2024/25 following delays in itrent project.
13,824 0 0
072
Customer Support Services Bord na Gaidhlig 13,596 675 12,921 Unspent Grant Grant funding from Bord na Gaidhlig. Ongoing spend ad hoc to deliver on commitments in the
Gaelic Language Plan. Grant income from GLAIF continues to be added to this total and then
paid out to projects.
1,000 11,921 0
073
Development & Economic Growth Crown Estates 1,261,200 280,651 980,549 Unspent grant 2022-23 grant funding for Coastal Communities Fund (Crown Estates).  Balance remaining at
23-24 year end £980,549.  Projects ongoing with anticipated spend in 24-25 - Rockfield Centre
(£60k), Campbeltown War Memorial (£17k) and Bowmore Hall (£53k).  The remaining projects
are underway with no confirmed spend - Jura Passenger Ferry (£100k), Pier Feasibility Studies
(£100k), Airport Resilience (£100k), Cemetery Maintenance (£300k), Kilmartin Car Park (£50k)
and Electric Charging Points (£200k - work ongoing with contractor on this project, spend
anticipated for 24-25). 
430,549 550,000 0
074 Development & Economic Growth UK Shared Prosperity Fund (UKSPF) 559,291 0 559,291 Unspent grant 2022-23 grant funding for UK Shared Prosperity Fund (UKSPF).  Funding can be spent up to
end of March 2025
559,291 0 0
075 Development & Economic Growth Islands Infrastructure Fund 265,258 209,647 55,611 Unspent grant 2022-23 grant funding for Islands Infrastructure Fund. To be spent in 23-24 with some slippage
in 24/25
55,611 0 0
076 Development & Economic Growth Scottish Govt Islands Programme 100,000 98,945 1,055 Unspent grant 2022-23 grant funding for Scottish Govt Islands Programme.mostly spent in 23/24,remaining
£1055 to be spent on travel in 24/25
0 1,055 0

Page 29

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
077
Development & Economic Growth LHEES (Local Heat & Energy Strategy) 75,000 0 75,000 Unspent Grant This is used to finance the delivery of the Local Heat and Energy Strategy, involving resourcing
a full time member of staff and use of external consultants.  This is fulfilling a statutory
requirement for the Council.  Production of the LHEES will be instrumental in achieving
funding for the decarbonisation of heat and energy use in Argyll and Bute’s Buildings.
50,000 25,000 0
078
Development & Economic Growth Planning Income 60,000 0 60,000 Unspent Budget To fund additional resources to support and develop the Council's planning service.  Whilst
recruitment issues within Argyll and Bute were largely been resolved during 2022/23, the
requirement for the operation of the DM Service with reduced staffing levels over an
extended period of time, coupled with the increasing demand for development post-Covid,
and uncertainty caused by the introduction of National Planning Framework 4 has given rise to
a substantial backlog of case work and has had a significant adverse impact on processing
times for planning applications.
Plans to utilise this on additional staff costs in 24-25 in order to reduce the backlog.
60,000 0 0
079
Development & Economic Growth Shelter Scotland Housing Funding 54,000 12,348 41,652 Unspent third
party contribution
Contribution from Shelter Scotland to fund 50% of a 2 year temporary Empty Homes Officer. 
Post holder now in place with remainder of costs to be incurred and earmarking drawn down
in 24/25.
41,652 0 0
080
Development and Economic Growth Crown Estates / Coastal Communities
Fund
1,634,604 777,665 856,939 Unspent Grant 2021/22 Crown Estate Funding (Coastal Communities Fund) of £1.635m.  Projects approved at
17 February 2022 P&R Committee totalling £1.191M, further report required to allocate
remaining £444k.  £778k has be drawn down.
The remaining projects are underway with no confirmed spend - Tarbert Public Realm (£196k -
contract in place, spend during 24-25), Kilmory Industrial Estate (£150k - no indication of when
will be needed), Rothesay Kiddies Corner (£44k, no indication of when will be drawn down at
present), Jura Community Gigsbit Programme (£50k, no indication of when will be spent),
Dunoon Cycle Bothy (£145k, work ongoing to progress this project, hopefully will be spent 24-
25),  Dunoon STEM hub (£150k, work ongoing to progress this project, hopefully will be spent
24-25), Glenmorag Caravan Site (£100k, works are starting with spend expected during 24-25),
£22k contingency.
856,939 0 0
081
Development and Economic Growth Coastal Communities (Capital) 489,000 149,781 339,219 Unspent Grant 2020/21 Crown Estate Funding (Coastal Communities Fund) totalling £1.504m.
Expenditure/allocation to projects delayed due to covid, now allocated as per report to P&R
on 18 Feb 2021. Projects include Dunoon STEM Hub 100k, Dunoon Cycle Bothy 249k, 
Ardrishaig North Project 50k and Arrochar car park £90k.  
249,219 90,000 0
082
Development and Economic Growth Coastal Communities 418,803 0 418,803 Unspent Grant 2020/21 Crown Estate Funding (Coastal Communities Fund) with original balance of £1.504m.
Expenditure/allocation to projects delayed due to covid, now allocated as per report to P&R
on 18 Feb 2021. £680k relates to works within the current capital programme, moved to line
Coastal Communities (Capital).   Remaining balance for Campbeltown Community Action Plan
(£50k), Helensburgh Clyde Street (£350k), Bute Community Land Bike Transfer Station (£10k)
Modular Hub Lochgilphead (£5k) and Tarbert Public Realm (£4k) to be spent in 24-25.
418,803 0 0
083
Development and Economic Growth Staycation and Marketing Argyll and
Bute
389,992 172,606 217,386 Unspent Grant As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m.  
This will include provision of additional waste disposal facilities and other facilities that will be
informed by the Motorhome and Informal Camping Survey.
As agreed at Council on 24 February 2022, Staycation investment £0.100m.  Augments the
2021/22 £0.5m staycation initiative with an additional investment of £100k, including support
for community groups and partners in the provision of facilities which can support increasing
staycation visitor numbers during the tourist periods. A further £155k committed for 24-25
across Clipper Race (£30k), Road Signs (£50k) and Marketing (£75k). 
155,000 62,386 0
084
Development and Economic Growth Oban TIF (Tax Incremental Financing) 385,193 171,035 214,158 Previous Council
Decision
Will be used to fund the TIF Programme office for a further 3 years as well as the programme
office for Rural Growth Deal beyond the funding that was agreed at Council for this in
February 2021.
214,158 0 0
085
Development and Economic Growth Rothesay Pavilion - Revenue
contribution
377,707 89,099 288,608 CHORD Build up a provision towards future Council commitment to provide additional financial
support up to £150,000 per annum towards Rothesay Pavilion running costs.
0 288,608 0
086
Development and Economic Growth Helensburgh CARS 327,000 196,514 130,486 Previous Council
Decision - Other
Conservation Area Regeneration Scheme for Helensburgh.  Grants awarded to upgrade
conservation areas in Helensburgh such as shop fronts, town centre accommodation and
other priority buildings. 
65,243 65,243 0
087 Development and Economic Growth Place Based Investment Programme 312,275 203,112 109,163 Unspent Grant Projects approved at 12 August 2021 P&R Committee totalling £821k, Remaining funds
committed and will be spent during  24/25.
109,163 0 0

Page 30

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
088
Development and Economic Growth Tackling Digital Exclusion Top-Up
Fund
217,600 0 177,600 40,000 Unspent Grant As agreed at the Council Meeting on 25 February 2021  to support communities and in some
cases individuals that are missing out on national programmes due to logistics and economies
of scale.  
Earmarking was originally £217,600 but £177,600 has been released back to the general fund. 
The  balance is committed  for Mobile Mapping (£25k) with expenditure expected during 24-
25 and the current Kerrera project (£15k) in 25-26.
25,000 15,000 0
089
Development and Economic Growth Lochgilphead CARS 200,000 0 200,000 Previous Council
Decision - Other
Conservation Area Regeneration Scheme for Lochgilphead  Grants awarded to upgrade
conservation areas in Lochgilphead such as shop fronts, town centre accommodation and
other priority buildings. No drawdown required in 23/24 .These are multi year projects with
spend generally increasing towards the end of the project life. Spend committed for 2024-25
and beyond. Project runs until March 2026
100,000 100,000 0
090
Development and Economic Growth LACER Funding (Sector Support Grant) 95,398 76,488 18,910 Unspent Grant Local Authority COVID Economic Recovery Fund grant.  This will provide funding, either part of
the small  business development grant or standalone, to help micros and small business to
implement projects that contribute to the sector as well as benefitting the business, for
example: Tourism and hospitality, food and drink or retail.  With option to provide additional
business support to hard hit areas including Bute and Kintyre where unemployment remains
higher than average - support via specialist advice, locally tailored grants to meet local
priorities and targeted marketing activity. to be split £115,000 for Shop fronts and £35,000 
Business support via Business Gateway. As at 31/03/2024 Shop fronts have £7760 remaining
and Bus support £11,150. The Bus support element along with ER refs 122 & 124 (totalling
36130) are to be spent on Digital Reviews as agreed at P&R committee on 09.05.2024. We
expect to commit all the spend in this FY 24-25, but as suppliers are paid for work only after it
has been completed, some of the costs may not actually be defrayed until Q1 25-26
18,910 0 0
091
Development and Economic Growth Strategic Events & Festivals 80,664 39,404 41,260 Unspent Budget At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for
Events and Festivals for 22/23, in order that the application process can commence during
21/22 and that this agreed figure be augmented by any underspend remaining from the 20/21
financial year.  At 24 February 22, decision made to agree £90k for 23/24, in order that the
application process can commence during 22/23 and that this agreed figure be augmented by
any underspend remaining from the 21/22 financial year.  Applications have been received
and payments will be made in 23-24. Final balance (£41,260) to be spent in 24/25
41,260 0 0
092
Development and Economic Growth Economic Development - temp post
to support economic recovery
55,000 19,105 35,895 Unspent Grant As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a
post to support the economic and social recovery together with the building back stronger
themes.  To be used to fund Settlement Project Support Officer during 23-24.  Post holder
resigned Dec 23.  Discussions on going on whether to fill the post to Sept 24.
35,895 0 0
093 Development and Economic Growth Island Post 50,461 0 50,461 0 Unspent Budget To fund a temporary post at LGE11 to assist with the National Islands Plan Implementation
Route Map 2020-2025.
0 0 0
094
Development and Economic Growth EH Covid Posts 37,775 20,078 17,697 Unspent Grant Funding initially for 2 posts for 2 years.  Posts were initially recruited to with one leaving and
the other going on maternity leave resulting in delays in expenditure.  One employee is now
back from maternity leave and earmarked reserve have drawn down to cover their costs in 23-
24 (20,078)
These monies are being used to fund additional costs related to the review and assessment of
site investigation reports and support the Senior Clerical post which is currently advertised. It
could support consultants given that there are 8 vacancies across the team
17,697 0 0
095
Development and Economic Growth Digital Boost 33,840 0 33,840 Unspent Grant To provide funding for Digital Boost program.  Initially was to be used to help fund the
programme in 21/22 but additional income was received by the service. Spend planned as 6k
on digital surgeries and £9k on digital events and workshops. The remaining £18, 840 will be
used to fund c25 digital reviews ,  All funds will be committed by end of 24/25 but as suppliers
are paid for work only after it has been completed, some of the costs may not actually be
defrayed until Q1 25-26. 
33,840 0 0
096
Development and Economic Growth Gypsy Traveller Grant/LACER Funding
(Gypsy Travellers)
32,826 0 32,826 Unspent Grant Local Authority COVID Economic Recovery Fund grant.  This funding would pay for MECOPP
(Minority Ethnic Carers of People Project) to engage with the Gypsy Travellers community on
the important subject of the cost of living increases, fuel poverty and the impact of factors
such as their remote rural locations and the facilities available to them for everyday living 
have on their livelihoods. This was originally LACER and additional funding routed through SG
for Gypsy Traveller sites received on behalf of ACHA (the sites have been transferred to
ACHA). This therefore isn't all a Council budget. The ACHA element of funding was for site
improvements - hence the planned roadway improvements
32,826 0 0

Page 31

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
097
Development and Economic Growth LACER Funding (New Enterprise
Support Grant)
31,159 18,830 12,329 Unspent Grant Local Authority COVID Economic Recovery Fund grant.  This funding would provide £3,000
grants to help new businesses start up and establish. 
This along with ER 115 & 124  (totalling 36130) are to be spent on Digital Reviews as agreed at
P&R committee on 09.05.2024 We expect to commit all the spend in this FY 24-25, but as
suppliers are paid for work only after it has been completed, some of the costs may not
actually be defrayed until Q1 25-26
12,329 0 0
098
Development and Economic Growth LACER Funding (Shop Local) 26,793 12,123 14,670 Unspent Grant Local Authority COVID Economic Recovery Fund grant.  This funding would provide funding to
continue the Shop Local scheme into 2023/24 and 2024/25, buying additional cards and allow
the cards to gather momentum and support local businesses.
14,670 0 0
099
Development and Economic Growth LACER Funding (Small Business
Development Grant)
24,988 12,337 12,651 Unspent Grant Local Authority COVID Economic Recovery Fund grant.  This funding will provide funding of
between £500 and £5,000 to help existing micro and small businesses to improve their
resilience or growth via projects to implement green initiatives, implement digital
development, implement marketing improvements and improve efficiency/innovation. 
This along with ER 115 & 122  (totalling 36130) are to be spent on Digital Reviews as agreed at
P&R committee on 09.05.2024 We expect to commit all the spend in this FY 24-25, but as
suppliers are paid for work only after it has been completed, some of the costs may not
actually be defrayed until Q1 25-26
12,651 0 0
100
Development and Economic Growth Kilmartin Museum 19,999 0 19,999 Previous Council
Decision - Other
Upgrade of Kilmartin Museum, works carried out by Museum with grants awarded upon
completion milestones.  Budget allocated to capital originally but was moved out of capital
and into earmarked reserves at 2020/21 budget meeting.  £20k retention due to be paid out in
23/24, however ongoing legal negotiations between Kilmartin & the contractors may mean we
are not able to pay this retention payment in 23/24
19,999 0 0
101
Development and Economic Growth Proposed Local Development Plan 2 19,910 0 19,910 Previous Council
Decision - Other
During 19/20, a cost pressure of £68,000 was allocated to deal with the costs associated with
the production of Local Development Plan 2.  The work carried out has taken longer than
planned and a draft report has only been received in Mid-march 24.  It will take some time to
review and agree a finalised report and as a result funds identified for this work will need to
be carried forward into 24/25 but will be drawn down very early in the year.
19,910 0 0
102
Development and Economic Growth UK Levelling Up Fund 19,465 0 19,465 0 Unspent Grant Development funding to help prepare UK Levelling Up Fund bids for 2 projects proposed by
the Council, received from Scottish Government.   Remaining funds will be drawn down in
23/24 for Consultant costs/ admin costs
0 0 0
103
Development and Economic Growth International Eight Metre Association
World Cup
0 0 10,000 10,000 Unspent Budget At the Council Budget meeting on 22 February 2024, the Council committed to a one-off
investment of £0.010m to the International Eight Metre World Cup in response to an external
funding request.
10,000 0 0
104
Development and Economic Growth Screen Machine 0 0 28,000 28,000 Unspent Budget At the Council Budget meeting on 22 February 2024, the Council committed to a one-off
investment of £0.028m to Screen Machine in response to an external funding request.
28,000 0 0
105
Financial Services Housing Benefits Private 321,524 179,430 142,094 Unspent Grant Specific funding allocation for Housing Benefit including DHP. Funds will be used to continue
to support vulnerable people initially financially affected by the COVID-19 outbreak but now
facing the cost of living crisis to sustain their tenancies.  This earmarking will help offset
potential overspends in the DHP/ Scottish Welfare Fund budget going forward.
142,094 0 0
106
Financial Services Flexible Food Fund 194,156 103,675 90,481 Unspent Grant Financial Insecurity funding from Scottish Government routed into the Argyll and Bute Flexible
Food and Fuel Fund (ABFFFF) is aimed at tackling financial insecurity for adults and families
across Argyll and Bute.  Working in partnership with the Community Food Forum, Bute Advice
Centre and ALIenergy, households with low incomes and no access to cash savings can apply
for immediate financial support.  The Fund helps support daily living expenses.   Since
inception in January 2021 until March 2023 client gain in extra benefits income for families
was £3.8 million with 2,500 families had been supported. The project has been extended to 31
March 2025 with funding coming from the UK Shared Prosperity Fund and this earmarking to
support it. The Council's Financial Inclusion and Advice Group have proposed that monies
from the Flexible Funding for Supporting People at tier 4 COVID earmarking should be used to
support this project to ensure it can continue to the contract end date of 31 March 2025. The
Scottish Government have provided this funding and have endorsed this award winning
project promoting it as part of the solution to end the need for foodbanks nationally.
90,481 0 0

Page 32

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
107
Financial Services Benefit Admin Grant 170,879 0 170,879 Unspent Grant Grant monies which would have to be repaid if not utilised for intended purpose.  Benefit
Administration activities in the build up to the migration of Housing Benefit to Universal
Credit.  These monies are committed to cover ongoing Benefit Administration activities in
22/23, 23/24 and 24/25 when it is now expected that the full migration of working age
Housing Benefit caseload to Universal Credit will be complete.  Monies will be used to
implement the recommended changes from the recent Revs and Bens BPR including ongoing
improvements to the Council's debt recovery policies (£50,000), build resilience including staff
overtime, outsourcing of Housing Benefit processing during the transition and cover casual
staff for the Universal Credit migration (£20,500). Monies also set aside for additional works to
the value of £40,000 with the software suppliers around enhancing the Revs and Bens system,
automating processes and transitioning customers to use digital gateways to contact the
service.
170,879 0 0
108
Financial Services Flexible Funding for Supporting
People while at Tier 4 COVID
76,357 17,376 58,981 Unspent Grant Funding from SG to strengthen local authority responses to meet emerging needs and support
people in their communities struggling with the restrictions and guidance at all protection
levels re COVID, particularly those at risk through health and social inequalities. This support
could cover the same types of support.  In June 2021 the Council agreed to support 20
projects led by a range of Council officers, officers from the HSCP and members of the third
sector to deliver wide ranging support across our region.  A report will be presented to
members in due course.
58,981 0 0
109
Financial Services Cost of Living Payments - Admin
funding
72,550 0 72,550 Unspent Grant Administration funding associated with Scottish Government schemes to issue monies to Low
income Households for the Cost of Living Payments. To provide additional staffing to help with
the backlog and to support the administration of the double charges on second homes in
2024/2025. We continue to receive a large number of enquiries from this customer profile
particularly given upcoming changes being made by the Assessor at DABVJB
72,550 0 0
110
Financial Services Pandemic Support Payments (CTR -
Admin)
51,968 0 51,968 Unspent Grant Administration funding associated with Scottish Government schemes to issue monies to CTR
recipients. Provide additional staffing to support the recovery from backlog of Council Tax
administration caused by Pandemic Support Payment process, further administration duties
related to LACER fund and also to support any further Scottish Government funding initiatives
that occur during 24/25
51,968 0 0
111 Financial Services Financial Systems 33,748 0 33,748 Unspent Budget The council is required to implement the IFRS16 Leases accounting standard  from the 1st
April 2024.
33,748 0 0
112
Financial Services Accounting and Budgeting Team
Resilience
30,664 0 30,664 Unspent Budget Training and examination fees for 6 staff who are currently undertaking their professional
CIPFA/ACCA training.  In addition funding the further training of 1 of our auditors and
providing finance business partner training to a group of our existing professional staff.
15,332 15,332 0
113
Financial Services CIPFA 24,040 6,821 17,219 Unspent Budget Training and examination fees for 6 staff who are currently undertaking their professional
CIPFA/ACCA training.  In addition funding the further training of 1 of our auditors and
providing finance business partner training to a group of our existing professional staff.
8,610 8,609 0
114 Financial Services Self Isolated Support Grant 5,316 0 5,316 Unspent Grant Unspent admin funding for processing Self isolation Support Grants. 5,316 0 0
115
Roads & Infrastructure Roads Reconstruction programme 6,206,000 5,041,000 1,165,000 Capital Projects At the Council Budget meeting on 23 February 2023, the Council committed to augmenting
overall allocation for the roads repair and maintenance programme with additional funds to
bring up to £8m total investment for 2023/24 and 2024/25.  This will be drawn down to the
capital plan during 24-25 and 25-26.
285,000 880,000 0
116
Roads & Infrastructure Piers and Harbours 2,789,311 0 2,789,311 Piers and
Harbours
Investment Fund
Funding generated through increased harbour fees and charges in order to generate funds to
meet the costs of the prudential borrowing required to develop and maintain the Council's
harbour assets and infrastructure. Under the Harbours Act 1964, section 42, as a statutory
harbour undertaker, the Council must prepare an annual statement of accounts relating to the
harbour activities and any associated activities for each harbour for which it is the statutory
harbour authority. This requirement cannot be satisfied by the preparation of a statement of
accounts which relates to other Council activities in addition to harbour activities.  In essence,
any surplus in the Piers and Harbours budget must be reinvested in the marine asset and
reflected in accounts.  Reserve will not be needed until circa 2026-27 when borrowing costs
will exceed the additional income received in revenue and reserve will then be used to pay
borrowing costs.
0 2,789,311 0

Page 33

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
117
Roads & Infrastructure Waste Variation Monies 1,967,056 725,304 1,241,752 Unspent Budget Waste Variation Monies - £1.242m balance at 31/03/24: This will be used to fund/part-fund
various waste infrastructure projects that will support the council’s compliance with the 2026
ban on the Landfill of Biodegradable Municipal Waste.
£725K in 2023-24 consisting of:- Gartbreck Cell, Blackhill road repairs and design works,
Composition Analysis, weighbridge equipment, capping study and restoration study.
£570K in 2024-25 consisting of :- Island restoration/capping, transfer design and recycling
improve. fund (island sites) design costs, technology trial on blue bin recycling participation,
consultancy costs relating to additional monitoring data for SEPA and waste PPP site
conversion.
£672K in 2025-26  consisting of:- Island restoration/capping, transfer station design cost
during construction, consultancy costs relating to additional monitoring data for SEPA and
waste PPP site conversion.
569,752 672,000 0
118
Roads & Infrastructure Footpath improvements 750,000 0 750,000 Previous Council
Decision
At the Council Budget meeting on 23 February 2023, the Council committed to providing
additional funding for footpath improvements across Argyll and Bute. Spend forecast for
23/24, draw down in 24/25.
750,000 0 0
119
Roads & Infrastructure Vehicle Replacement 657,921 174,260 483,661 Fleet - Timing
Delay
Timing delay in fleet replacement causing one-off saving.   Vehicles purchased and received in
22/23 for £174k, draw down to capital will be processed in 23/24.  remainder has been spent
in 23-24 and will be drawn down in 24-25.
483,661 0 0
120
Roads & Infrastructure Active Travel 500,000 130,000 370,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the Council committed to additional
investments.  For Active Travel £0.500m for further improvements for footpaths and
pavements and supporting safer routes to schools across Argyll and Bute. Some capital
expenditure to be incurred in 22-23 and drawn down in 23-24, remainder planned to be spent
in 23-24 and drawn down in 24-25.
370,000 0 0
121
Roads & Infrastructure 3G pitches / Tarbert Sports Pitches 375,022 87,187 287,835 Unspent Budget In November 2018, the Council agreed to a maintenance funding package to be progressed for
a number of 3G pitches including Tarbert. This funding will provide an estimated 6.5 years’
worth of ongoing maintenance up to 2025-26. There is the potential to extend the continued
upkeep of the pitches until 2026-27 given the earmarking available will not be fully utilised by
the end of 2025-26.  However, there will be potential redundancy costs for 2 employees that
will need to be covered from the remaining balance.
87,835 200,000 0
122
Roads & Infrastructure Street Lighting 300,000 0 300,000 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the Council committed to additional
investments. For Street Lighting, £0.300m to deliver a programme of street lighting column
replacement and improvement across Argyll and Bute, prioritised based on condition, with
funding for at least 260 lighting columns.  Expenditure planned for 23-24, draw down in 24-25
(capital expenditure).
300,000 0 0
123
Roads & Infrastructure Green Transport Initiatives 140,000 0 140,000 Unspent Budget At the Council meeting on 27 February 2020, it was agreed to input £400k in Green transport,
investment in footway and cycle path maintenance supporting the healthy wellbeing and
green agenda.  Spend has been delayed due to COVID and this will be taken forward in 23/24.
£260k Footways Reconstruction programme now spent and will be drawn down against
capital programme during 23/24. £140k Ardrishaig North Project spent in 22/23 and drawn
down in 24/25 (capital expenditure).
140,000 0 0
124
Roads & Infrastructure Climate Change 81,884 40,942 40,942 Unspent Budget At the Council meeting on 27 February 2020, it was agreed to input £500k budget to mitigate
the impacts of weather related damage and climate change with specific emphasis on gully
cleaning and drainage improvements.  Spend has been delayed due to COVID and the
intention is to spend the funds on 2 Gully Motors plus staff over next 2 years. Vehicles have
been received and budget will be drawn down to cover their cost. The remaining budget will
be used towards running the vehicles.
40,942 0 0
125
Roads & Infrastructure Parking Grant 50,013 0 50,013 Unspent Grant Grant from Scottish Transport for the assessment of footway parking required under the
Transport (Scotland) Act 2019.  Assessment criteria from the Scottish Gov which will take
approx. 12 months to complete throughout 23/24 with work then to follow in 24/25.
50,013 0 0
126
Roads & Infrastructure Mercury Abatement - Crematorium 42,819 0 42,819 Unspent Third
Party Contribution
Phase 1 and 2 of Cardross Crematorium work completed. Phase 3 of the Cardross
Crematorium works commenced April 2024. These works will ensure DDA compliance.
42,819 0 0
127
Roads & Infrastructure Amenity Services introduction of
management information system
28,099 0 28,099 Unspent Budget Delay with introduction of amenity time recording system due to increased costs.  Discussions
ongoing to find alternative cheaper solution.  The software/system being introduced by
HR/Payroll during 2023-24 offers a time-recording facility.  Although not included in the
current HR/Payroll spec, once the new system is up and running, the proposal would be to
investigate the time-recording system to see if viable for amenity time recording purposes.
0 28,099 0

Page 34

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
128
Roads & Infrastructure Hermitage Park Pavilion 18,938 0 18,938 Hermitage Park The Hermitage Park regeneration project has a significant investment from the Heritage
Lottery Fund (HLF) which has a requirement to have a 10 year Management and Maintenance
Plan.  This will be partly funded by existing Council revenue budgets but should also be
supplemented by any additional income which can be generated from park activities.  Part of
the HLF conditions are that all income generated by the park should be retained to support
the Management and Maintenance Plan and a result of this requirement, any unspent income
generated by the park is retained for future years requirements.
10,000 8,938 0
129
Roads & Infrastructure Bin Replacement Programme 17,815 16,360 1,455 Previous Council
Decision
At the Council Budget meeting on 24 February 2022, the Council committed to additional
investments - £0.100m in Argyll and Bute’s litter bin replacement programme and
infrastructure, providing almost 200 new/better bins across the area where required due to
condition/need and with a focus on town centres and prominent locations, to support cleaner
communities.  Requests that officers explore options for use of new and innovative litter
disposal solutions for future consideration. 
0 1,455 0
130
Roads & Infrastructure Services (2023 Contract Inflation Adjustments)
Waste PPP
255,000 31,739 223,261 Unspent Budget Contract Inflation adjustments - £0.223m balance at 31/03/24.  Adjustment to inflation
included in the budget based on updated RPIX figures at February 2023.  Based on actuals in
23-24, only £32k of this was required leaving a balance of £223k.
223,261 0 0
NON DEPARTMENTAL
131
Non Departmental Strategic Housing Fund 7,247,496 1,057,305 6,190,191 Strategic Housing
Fund
Accumulation of Council tax collected from the second homes discount on properties is
earmarked as part of the Strategic Housing Fund balance.   Plans in place to utilise £11.472m
over the next 5 years to provide affordable housing as part of the Strategic Housing
Improvement Plan which will utilise this reserve as well as future income expected from
Council Tax on second homes.
2,300,000 3,890,191 0
132
Non Departmental Further Capital pressures per budget
pack February 22
3,900,000 1,252,000 2,648,000 Capital Projects As agreed at Council on 24 February 2022, a provision for Capital contract increases £3.900m.
£1.133m draw down in 24-25 for Campbeltown Flood plus a further £0.468 for other capital
increases.
£0.322m draw down in 25-26 for ICT and £0.279 in 26-27.
£0.446m is unallocated
1,601,000 1,047,000 0
133
Non Departmental Investment in Affordable Housing 3,163,000 0 139,000 3,024,000 Investment in
Affordable
Housing
Agreed at Council Meeting 11 February 2016.  This balance reduces as the Loans to RSL
balances are reducing.
0 3,024,000 0
134
Non Departmental Capital Budget (Previously Asset
Management Fund)
2,098,089 28,031 2,070,058 Capital Projects At the Council meeting on 22 February 24, it was agreed that the balance in this reserve be
allocated to the Capital budget.  Exact profile not known for the capital projects this will be
funding but likely draw down will be 25-26.
0 2,070,058 0
135
Non Departmental Redundancy Provision 1,578,026 114,619 1,463,407 Unspent Budget One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost
pressures as agreed at budget setting meeting in February 2020. Future redundancies
provision.
150,000 1,313,407 0
136
Non Departmental Regeneration and Economic
sustainability in Lochgilphead and
Tarbert.
1,459,579 410,000 1,049,579 Lochgilphead and
Tarbert
Regeneration
Agreed at Council Meeting 11 February 2016.  £761k will be drawn down in 24-25 to fund prior
years expenditure for Lochgilphead Front Green and Ardrishaig North.  £289k unallocated.
760,579 289,000 0
137
Non Departmental Connect for Success Fund (previously
Supporting Organisational Change) -
amended February 24 per ELT)
1,426,074 744,775 681,299 Unspent Budget One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost
pressures as agreed at budget setting meeting in February 2020 - Provision to support
organisational change (£0.500m)
It is proposed to supplement the existing 'Supporting Organisational Change' reserve first
established in February 2020 with a further £1.2m to enable the Council to deliver longer
term, more fundamental, service redesign which will require funding to support the
identification and delivery of  solutions that take account of future requirements and
community engagement and deliver longer term revenue and benefits to the Council
406,000 275,299 0
138 Non Departmental Campbeltown Flood Prevention 1,406,000 0 1,406,000 Unspent Budget Funding agreed as part of the Loans Fund Review for Campbeltown Flood Prevention.  75,000 1,331,000 0
139
Non Departmental Rothesay Pavilion (Recovery and
Renewal Fund)
1,360,000 0 1,360,000 Unspent Grant As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is
provision for future recovery, regeneration and renewal, as well as any future pressures which
may arise following the Covid-19 pandemic through a dedicated Recovery and Renewal Fund. 
Commitments have been made against this fund as follows: Levelling up bid costs £0.150m,
Scotland Loves Local overspend £0.037m and Rothesay Pavillion £1.360m.
0 1,360,000 0
140 Non Departmental Underwriting development of
Rothesay Pavilion
1,000,000 0 1,000,000 Unspent Budget Funding to meet additional costs identified as necessary for the refurbishment of Rothesay
Pavilion (£1m).
1,000,000 0 0
141
Non Departmental Oban TIF (Tax Incremental Financing -
Excess NDR)
875,651 0 875,651 Previous Council
Decision
This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure projects. 
This fund will be used in the future as TIF projects are delivered.   Discussions in place on
future ff the next TIF project (Oban Airport) which will utilise this reserve.  If the project does
not go ahead, we will need to return NDR to Scottish Government
0 875,651 0

Page 35

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
142
Non Departmental Inward investment Fund 664,665 123,768 540,897 Inward Investment
Fund
Agreed at Council Meeting 11 February 2016.   Original balance of funding was £833k for Rural
Growth Deal - P&R Committee have already approved spend of £600k leaving a balance of
£233k uncommitted. The approved spend consists of consultancy, project development and
design and the remaining £233k will be used for the same purpose to complete design work
and get endorsed full business cases to allow RGD projects to commence.
267,740 273,157 0
143 Non Departmental COVID Funding 418,337 0 418,337 Unspent Grant Net balance on COVID cost centres at year end 2022/23 with proposals on use to be
developed.
0 418,337 0
144
Non Departmental Capital pressure 257,000 0 257,000 Capital Projects Pressure identified on the 20/21 COSLA COVID costs spreadsheets - requires to be earmarked
to be drawn down when required against the Capital Plan.  To be incurred during 23-24 and
drawn down in 24-25.
257,000 0 0
145
Non Departmental Information Management (Balance of
Funding)
209,844 9,375 200,469 Unspent Budget To support a number of initiatives in respect of improving the Council's information
management in line with the transformation agenda and increasing the pace of change as
outlined in the BV Review.  The planned initiatives include: Estates Survey work £122k,
Digitalisation of Title Deeds £92k, document management and workflow system for Planning,
Building Standards and Environmental Health £77k and a balance of funding to explore
information management solutions in a strategic and coherent way £209k.  Committed for MS
365 project - D Logan/I Jackson. Paper went to DMT in Dec.
200,469 0 0
146
Non Departmental Levelling up Fund bids per P&R
February 22
150,000 0 80,000 70,000 Unspent Grant £15k to be drawn down in 2024-25 for post that is currently in place. £55k to be utilised in
2024-25 for Student Summer post, contaminated land consultants, ICT development,
increased costs for current staff on a temp arrangement and to part fund 2 year temporary
Regulatory Service Officer post.
Not all spend has been agreed yet and business cases are pending.
70,000 0 0
147
Non Departmental Levelling up bid costs (Recovery and
Renewal Fund)
150,000 150,000 Unspent Grant As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is
provision for future recovery, regeneration and renewal, as well as any future pressures which
may arise following the Covid-19 pandemic through a dedicated Recovery and Renewal Fund. 
Commitments have been made against this fund as follows: Levelling up bid costs £0.150m,
Scotland Loves Local overspend £0.037m and Rothesay Pavilion £1.360m.
0 150,000 0
148
Non Departmental Engagement with Hub North re
provision of services for older adults
and vulnerable people across Argyll
and Bute
100,000 0 100,000 Unspent Budget At the Council budget meeting February 23, an allocation of £0.1m from the Unallocated
General Fund balance for the Health and Social Care Partnership to engage, in partnership
with the Council, with Hub North to develop a strategic business case in relation to the
provision of services for older adults and other vulnerable people across Argyll and Bute.  It is
intended that this will be spent on an on-going business case and options appraisal work with
Hub and that a sizable proportion will be spent during 24/25
70,000 30,000 0
149
Non Departmental Spend to Save Route Optimisation
Software
100,000 17,225 82,775 Unspent Budget One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost
pressures as agreed at budget setting meeting in February 2020 -  Spend to save route
optimisation (£0.100m) which will be spent over  2023/24 and 2024/25.
82,775 0 0
150
Non Departmental CHARTS 80,000 75,000 75,000 80,000 Unspent Budget At the Council Budget meeting on 22 February 2024, the Council committed to £0.075m one-
off investment in CHARTS in response to an external funding request will be spent in 24-25.
There remains £0.005m from a COVID earmarking for CHARTS as well.
80,000 0 0
151
Non Departmental Scotland Loves Local Overspend
(Recovery and Renewal Fund)
37,000 37,000 Unspent Grant As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is
provision for future recovery, regeneration and renewal, as well as any future pressures which
may arise following the Covid-19 pandemic through a dedicated Recovery and Renewal Fund. 
Commitments have been made against this fund as follows: Levelling up bid costs £0.150m,
Scotland Loves Local overspend £0.037m and Rothesay Pavilion £1.360m.
0 37,000 0
152
Non Departmental Funding Gap in Capital Programme 0 2,131,000 -2,131,000 Unspent Budget Funding agreed as part of the Loans Fund Review for the Funding Gap in Capital Programme
£2.619m which will be earmarked from the 2023-24 outturn but some drawdowns have
already occurred during 2023-24.  Planned to fund capital programme and drawn down in 24-
25.
-2,131,000 0 0
153
Non Departmental Significant Strategic Change Projects 0 689,000 -689,000 Unspent Budget Funding agreed as part of the Loans Fund Review for Significant Strategic Change Projects
£2.157m which will be earmarked from the 2023-24 outturn but some drawdowns have
already occurred during 2023-24.  £689k of expenditure incurred and will be drawn down in
23-24, remainder planned for 24-25.
-689,000 0 0
154
Non Departmental Service Concessions - Capital Projects
Inflation Pressures
0 0 297,000 297,000 Unspent Budget As agreed at Council meeting 23 February 2023 -Boosting resilience of Capital Programme and
providing added support as required for key capital/infrastructure projects - £2m.
Further allocation agreed Council meeting 22 February 24 - increase capital contract
earmarking to protect current capital projects in plan £0.297m
0 297,000 0
155
Non Departmental Capital Budget 0 0 2,212,000 2,212,000 Capital Projects At the Council Budget meeting on 22 February 2024, the Council committed to allocating
released earmarkings amounting to £2.212m towards the Capital budget.
2,212,000 0

Page 36

Ref Service Description Amount
Earmarked at
31 March 2023
Actual Spend 
2023/24
Funds
Unearmarked
New
Earmarking
Agreed by
Council
During
2023/24
Closing
Balance at 31
March 2024
Reason for
Carry Forward
Plans for Use Amount
Planned to be
Spent in
2024/25
Amount
Planned to be
Spent in
2025/26
Amount
Planned to be
Spent from
2026/27
onwards
156
Other Operating Income and
Expenditure
Educational Support to Ukrainian
Children and Young People
335,671 111,306 224,365 Unspent Grant Balance of grant received in 2022-23 for provision of childcare and education support to
Ukrainian children and young people. Spending plan includes teaching and support staff within
schools.
224,365 0 0
SOCIAL WORK
157
Adult Services See Hear Funding 13,658 0 13,658 Scottish
Government
Initiatives
Funding has been received specifically from the Scottish Government to support activity
around implementation of the See Hear recommendations and the identified priorities of
individual Sensory Partnerships. No plans for spend in current financial year, funds will be
used in the next two years in accordance with the See Hear plan and Argyll and Bute's BSL
Local plan.
6,829 6,829 0
158
Children and Families Criminal Justice Transformation
Funding
39,890 0 39,890 Unspent Third
Party Contribution
Additional funding from SG to fund redesign work within Criminal Justice. Funds to be pooled
with equivalent additional funding received by our CJ Partnership Partners to fund a
transformation and development project across the three partner areas.  The money will be
spent in 24/25 to meet outcomes of the four year plan - near completion, including
consultations and supporting people to access services
39,890 0 0
79,465,982 27,286,334 2,351,505 2,682,000 52,510,143 0 21,470,755 31,039,388 0