Democracy Spraffa

Supplementary Agenda - 18 June 2025

West Dunbartonshire Council · 18 June 2025
Back to West Dunbartonshire Council — 18 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Supplementary
Agenda 
West Dunbartonshire Council 
Date:  Wednesday, 18 June 2025 
Time:  16:00 
Format:  Hybrid Meeting 
Contact:    Carol-Ann Burns, Senior Democratic Services Officer  
Email: carol-ann.burns@west-dunbarton.gov.uk   
committee.admin@west-dunbarton.gov.uk 
Dear Member 
ITEMS TO FOLLOW 
I refer to the agenda for the above meeting that was issued on 5 June 2025 and now
enclose a copy of the undernoted report relating to Item 12 which was not available for
issue at that time. 
Members are requested to note, with respect to Item 9, ‘Review of Integration
Scheme’, that it has not been possible for a report on this matter to be provided in time
for the Meeting of Council being held on 18 June 2025 and that this report will instead
be submitted to the Meeting of Council being held on 27 August 2025. 
Yours faithfully 
PETER HESSETT 
Chief Executive

Page 2

Note referred to:-/ 
12 UNAUDITED 2024/25 WEST DUNBARTONSHIRE COUNCIL    115 – 268 
ANNUAL ACCOUNTS               
Submit report by the Chief Officer – Resources providing a copy of the
unaudited 2024/25 Annual Accounts and information regarding the 
2024/25 outturn as set out in the draft accounts. 
Distribution:- 
Provost Karen Murray Conaghan Councillor June McKay
Councillor James Bollan  Councillor John Millar
Councillor Kevin Crawford Councillor Lawrence O’Neill
Councillor Ian Dickson Councillor Lauren Oxley
Councillor Diane Docherty Councillor Chris Pollock
Councillor Fiona Hennebry Councillor Martin Rooney
Councillor Gurpreet Singh Johal Councillor William Rooney
Councillor Daniel Lennie Councillor Gordon Scanlan
Councillor David McBride Councillor Hazel Sorrell
Councillor Jonathan McColl Councillor Clare Steel
Councillor Michelle McGinty Councillor Sophie Traynor 
Chief Executive
Chief Officers 
Date of issue: 11 June 2025

Page 3

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Resources 
Council: 18 June 2025 
Subject:  Unaudited 2024/25 Annual Accounts 
1. PURPOSE 
1.1 The purpose of this report is to provide Council with a copy of the unaudited
2024/25 Annual Accounts and information regarding the 2024/25 outturn as
set out in the draft accounts. 
2. RECOMMENDATIONS 
2.1 Members are asked to: 
a) note the unaudited 2024/25 Annual Accounts
b) note the information provided in relation to the financial
performance of the Council’s services and capital plan for 2024/25
c) note the current position regarding the Council’s reserves
d) Agree to delegate authority to the Audit Committee to formally approve
the audited accounts. 
3. BACKGROUND 
3.1 The annual unaudited accounts set out the financial statements of West
Dunbartonshire Council (the Council) for the year ended 31 March 2025. 
Their main purpose is to demonstrate the stewardship of public funds
entrusted to the Council. The requirements governing the format and content
of local authority annual accounts are contained in the Code of Practice on
Local Authority Accounting in the United Kingdom (the Code). The 2024/25
accounts have been prepared in accordance with this Code. 
3.2 There is a statutory requirement to prepare a set of accounts and submit
them to the Controller of Audit. The date set by the Scottish Government for
the submission of the unaudited annual accounts is 30 June each year. 
3.3 The 2024/25 accounts will be submitted to Forvis Mazars by 30 June 2025. 
4. MAIN ISSUES 
4.1 The unaudited accounts show that the outturn on the general fund is an
overspend of £2.908m after the budgeted use of additional resources of
£9.343m which was offset by the in-year pension fund saving of £9.688m
resulting in a decrease in the General Fund position of £2.908m.  This
represents an overspend of 1.02% against the 2024/25 revised budget of
£295.469m. 
ITEM 12
Page 115

Page 4

4.2 The £2.908m overspend breaks down as: 
£’000
Service overspend including loan charges 3,862
Over recovery taxation and non-specific grant income  (781)
Final Budgetary Control Position (Appendix 2) 3,081
Movement in Bad Dept Provision 172
Contribution to reserves from pension saving (345)
Total  2,908 
The Housing Revenue Account (HRA) is reporting an in-year deficit of
£0.358m. 
4.3 Since 2010/11 local authorities have been required to prepare financial
statements following International Financial Reporting Standards (IFRS).
Under the Local Authority Accounts (Scotland) Regulations 2014 there is a
requirement to include a management commentary in the accounts. The
contents of the annual accounts are summarised in the paragraphs that
follow. 
4.4 Management Commentary: outlines the key messages regarding the
objectives and strategy of the Council and its financial performance for the
year. It also looks forward, outlining the future financial plans for the
organisation and the challenges and risks which are faced by the Council. 
4.5 Statement of Responsibilities for the annual accounts: outlines the
Council’s responsibilities and also the responsibilities of the Council’s Section
95 Officer. 
4.6 Annual Governance Statement: details the view on the adequacy of its
governance and internal control system. It is the Council’s view that the
systems for governance and internal control are operating effectively within
the Council during 2024/25 and that there are no significant weaknesses. 
4.7 Remuneration Report: details the remuneration policy, remuneration and
pension benefits of senior councillors and senior officers in addition to detail
on employee exit packages. 
Comprehensive Income and Expenditure Statement (CIES): 
4.8 This statement shows the accounting cost of providing services rather than
the amount to be funded from taxation, to comply with the requirements of
the Code. This means the net cost of service includes statutory accounting
adjustments for depreciation, loans fund principal repayment, the net change
for the pension adjustment and accrued holiday leave not taken by 31 March
2025; reducing the total cost of service provision by £22,928m.  This is one of
the main reasons why the actual outturn shown within the Comprehensive
Page 116

Page 5

Income and Expenditure account differs from the actual outturn shown within
the management commentary (page 8 of accounts), as these costs are not
included as part of the service budgets.  A reconciliation between the two
outturns is shown at paragraph 4.10. 
4.9 The Council ended the year with a 2024/25 deficit of £25.775m.  This is the
accounting surplus based on the IFRS compliant accounts rather than the
movement in the General Fund Balance. It comprises of the following: 
£000
Deficit on Provision of Services 25,775
Deficit on the revaluation of long term assets (8,560)
Actuarial loss on the pension fund asset (20,752)
Total Deficit (3,537)  
4.10 The table below, sets out a reconciliation of the deficit on the provision of
services of £25.775m as noted in the Statement of Comprehensive Income
and Expenditure under IFRS requirements and the in-year revenue
overspend of £3.081m against budget (paragraph 4.2): 
£000
Deficit on Provision of Services per the Comprehensive Income
and Expenditure Statement
25,775
Statutory adjustments required by the Code (paragraph 4.8) (20,851)
Deficit on Provision of Services per Movement in Reserves – pg
34 of annual accounts (£4.566m for general fund plus £0.358m for HRA)
4,924
Adjust for movements to/from statutory reserves: 
Capital Receipts applied (1,706)
Other Reserves 48
HRA Reserves (358)
Movement in General Fund Balance 2,908
Budgeted use of reserves (9,343)
Increase in BDP (0.172)
Decrease in pension contributions 9.688
Net General Fund budgetary control position 2024/25 3,081 
4.11 Balance Sheet: The Balance Sheet shows that the net worth of the Council
has increased by £3.537m from £363.802m as at 31 March 2024 to
£367.339m as at 31 March 2025. The major changes are set out in the table
below. 
Page 117

Page 6

Movement in Reserves Statement
4.12 This shows the movement on the different reserves held by the Council,
analysed into usable reserves (resource backed reserves which can be used
to fund expenditure) and unusable reserves (required purely for accounting
purposes and are not backed by resources). 
4.13 The total Council reserves have increased from £363.802m at 31 March
2024 to £367.339m at 31 March 2025, an increase of £3.537m, due to the
reasons detailed in the table above. 
4.14 The balance of unusable reserves has increased by £6.968m from
£347.055m as at 31 March 2024 to £354.023m as at 31 March 2025. This is
mainly due to the revaluation of assets offset by the movement in the pension
liability. 
4.15 Cash Flow Statement: The Cash Flow Statement shows the changes in
cash and cash equivalents of the Council during the financial year. The Cash
and Cash Equivalents increased by £16.170m to £8.227m.   
4.16 Notes to the Financial Statement: The notes section provides further
information and explanation on some of key figures included within the
Accounts. The notes conform to the guidance issued by CIPFA/LASAAC
within the Code of Practice on Local Authority Accounting. 
4.17 Council Tax Income Account: This account shows the gross income raised
from council tax levied and deductions made under the Local Government
Finance Act 1992. The resultant net income is transferred to the CIES.
Council Tax was frozen in 2024/25 therefore Council Tax rate for Band D
was £1,398.98 for 2024/25. The income transferred to the general fund for
Council Tax in 2024/25 was £41.701m. This compared to £40.798m in
2023/24. 
4.18 Non-Domestic Rate Income Account: This account is an agent’s statement
that reflects the statutory obligation for billing authorities to maintain a
separate Non-Domestic Rate Account. Net Non-Domestic Rate Income to the
Consolidated Income and Expenditure Account amounted to £87.481m for
2024/25. This compares to £93.396m in 2023/24. This is the Council’s share
of the estimated NDR income which has been distributed proportionately on
the basis of the Council’s 2023/24 mid-year income.  It does not represent
additional income to the Council, just a distribution of the national pool to
reflect what is due to the Council as agreed as part of the 2024/25 settlement
figure (already accounted for) and what the Council collected. 
4.19 Housing Revenue Account: In relation to the HRA, the draft accounts show
a balance of £0.611m as at 31 March 2025.  This is below the prudential
reserve target of £1.064m.   Steps are being put in place to try to build the
reserves back up to the prudential target in 2025/26 and beyond. 
Page 118

Page 7

Capital Programmes 
4.20 Details of the capital programmes are shown in Appendix 4 (General Fund)
and Appendix 5 (HRA) and are summarised below. The appendices detail
the outturn of the projects within 2024/25. A list of the main capital projects
progressed during 2024/25 is provided on page 12 of the Annual Accounts.
The year end position is summarised as follows: 
Budget Spend Variance Overspend Underspend Reprofiling  
£,000 £,000 £,000 £,000 £,000 £,000
General
Services 58,517 55,736 (2,781) 4,839 (262) (7,358)
HRA 63,661 56,603 (7,058) 7,148 (14,206) 0
Total 122,178 112,339 (9,839) 11,987 (14,468) (7,358) 
4.21 The main areas of reprofiling in the year were: 
General Services
Schools Estate
Improvement Plan
Works Progressing. Projects anticipated to complete in 2024/25. 
Vehicle
Replacement
Delay due to the vehicle build time associated with the
specialist vehicles and the delivery lead time from the date of
supply order placement.
Levelling Up Fund Artizan masterplan approved in November 2023. Designs are
progressing as planned but some delays due to enabling works
and commencement of the design phase 
4.22 Group Accounts: The Council is required to prepare Group Accounts in
addition to its own Annual Accounts. Group Accounts are prepared when a
Council has a material interest in other organisations. The purpose of the
accounts is to combine its financial information with other organisations
within its group. For 2024/25 the Council’s group consists of 
(a) West Dunbartonshire Leisure Trust
(b) Dunbartonshire and Argyll and Bute Valuation Joint Board
(c) Clydebank Property Company
(d) West Dunbartonshire Energy Company
(e) Health and Social Care Integrated Joint Board
(f) Dumbarton Common Good and Trust Funds. 
4.23 At the time of drafting the financial statements we had not received the
financial statements from all consolidated entities and the group position will
be updated in the final draft sent to Forvis Mazars by the 30 June 2025. 
Areas requiring updating are highlighted in yellow in the annual accounts
(Appendix 1)  
Next Steps 
4.24 To enable the Council to meet its legislative requirements, Members require
Page 119

Page 8

to approve the audited Annual Accounts for signature no later than 30
September 2025. As the audit of the Council’s 2023/24 accounts is still
ongoing it is clear that the audit of the 2024/25 accounts will be completed by
the 30 September 2025 deadline. It is not clear when the 2024/25 audit will
be completed by and therefore it is not possible to determine which future
meeting of the Council will be presented with the audited accounts for
approval.  Depending on the timing of the completion of the 2024/25 audit it
may be that a meeting of the Audit Committee will be the most suitable time
for the Accounts to be approved. Council is therefore asked to agree to
delegate authority to the Audit Committee to formally approve the audited
accounts if required. 
Charity Accounts 
4.25 Appendix 6 provides Members with the accounts of the Trust Funds which
are administered by the Council. These Financial Statements are also
audited by our external auditors prior to submission to the Office of the
Scottish Charity Regulator (OSCR). The draft Financial Statements 2024/25
will be presented to the external auditors. These are also included within the
Council’s Group position. 
The summary position of the Trusts are noted below – interest gained was
received for all trusts, with six grant payments made, four from the Alexander
Cameron Bequest and two from Dr AK Glen Fund. As the AK Glen Fund has
bene fully distributed it has been wound up and removed from the Scottish
Charity Register. 
Opening Balance   
2023/24
Surplus /
(Deficit)   
2023/24
Closing
Balance   
2023/24
Dunbartonshire
Educational Trust
Scheme 1962
96,725 (963) 95,762
McAuley Prize for
Mathematics 23,352 1,114 24,466
Alexander
Cameron Bequest 121,963 (3,018) 118,944
UIE Award 26,401 1,259 27,661
Totals 268,442 (1,609) 266,833 
4.26 The audited Trust Fund accounts will be approved by the Council, together
with the Council’s Financial Statements. 
4.27 Common Good 
Appendix 7 provides Members with the accounts of the Dumbarton Common
Good which are administered by the Council, also audited by our external
auditors as part of the year end process. This is also included within the
Council’s Group position. 
The main movements within the common good are noted below:
Page 120

Page 9

£
Opening Balance 561,314
Income 328,833
Expenditure (522,319)
Closing Balance 367,828 
CONCLUSION 
4.28 
4.29
The Unaudited Annual Accounts have been prepared in accordance with
professional and statutory requirements. The General Fund Balance has
decreased by £2.908m from an opening balance of £15.371m to £12.436m,
after taking into consideration the movement during the year, the end of year
outturn position and earmarked balances. The Council’s net worth, per the
balance sheet, has increased from £363.802m at 31 March 2024 to
£367.339m at 31 March 2025, a increase of £3.537m. 
It should be noted that as the audit of the 2023/24 financial statements is still
ongoing as a result the 2023/24 prior year comparatives and therefore
balances roll forward to 2024/25 may be subject to change following the
conclusion of the audit. 
5. PEOPLE IMPLICATIONS 
5.1 There are no people implications as a consequence of this report. 
6. FINANCIAL AND PROCUREMENT IMPLICATIONS 
6.1 There are no direct financial or procurement implications arising from this
report. 
7. RISK ANALYSIS 
7.1 No risk analysis was required 
8. EQUALITIES IMPACT ASSESSMENT (EIA) 
8.1 No equalities impact was required in relation to the preparation of this report. 
9. CONSULTATION 
9.1 The views of Legal Services have been requested on this report and have
advised there are neither any issues nor concerns with the report. 
10. STRATEGIC ASSESSMENT 
10.1 Sound financial practices are cornerstones of good governance and support
Council and officers to pursue the Council’s strategic priorities. 
Laurence Slavin
Chief Officer - Resources
Page 121

Page 10

Date:   18 June 2025 
Person to Contact: Carol Alderson, Finance Manager, 16 Church Street, Dumbarton    
E-mail: carol.alderson@west-dunbarton.gov.uk
Appendices
1. Draft Annual Accounts to 31 March 2025 
2. General Services Budgetary Control Report to 31 March 2025 – Revenue
3. HRA Budgetary Control Report to 31 March 2025 - Revenue
4. General Services Budgetary Control report to 31 March 2025 – Capital
5. HRA Budgetary Control Report to 31 March 2025 - Capital
6. Draft Annual Accounts to 31 March 2025 for Trust Funds 
7. Draft Position to 31 March 2025 for Dumbarton Common Good 
Background Papers
Budget Report to Council - 6 March 2024 
Page 122

Page 11

APPENDIX 1
Page 123

Page 12

Contents                                                                 
Table of Contents 
Page   
Page
Management Commentary 1 Note 21   Financial Instruments 69
Explanatory and Assurance Statements  Note 22   Defined Benefit Pension
Scheme
75
Statement of Responsibilities 18 Note 23   Termination benefits 80
Annual Governance Statement 19 Note 24   Other Reserves 80
Remuneration Report 24 Note 25   Related Parties 83
Principal Financial Statements of Singe Entity  Note 26   Agency Services 84
Comprehensive Income and Expenditure Statement 32 Note 27   Financial Guarantees 84
Balance Sheet 33 Note 28   Contingent Assets and
Liabilities
84
Movement in Reserves Statement 34 Note 29    Fees payable to External
Audit
85
Cash Flow Statement 35 Note 30   Events After the Balance
Sheet Date
85
Notes to the Principal Statements  Housing Revenue Account 86
Note 1    Accounting Policies 36 Council Tax income Account 88
Note 2    Critical Judgement in Applying Accounting Policies 48 Non-Domestic Rate Income
Account
89
Note 3    Assumptions Made About the Future and Other Major
Sources of Estimation Uncertainty
49 Common Good 90
Note 4    Accounting Standards that have been issued but   
have not yet been adopted
50 Trust Funds     91 
Note 5    Expenditure and Funding Analysis 51 Group Comprehensive Income and
Expenditure    
92
Note 6    Adjustments between funding accounting basis and
funding basis under regulations
54 Group Balance Sheet 93
Note 7    Earmarked Reserves 56 Group Movement in Reserves
Statement
94
Note 8    Financing and Investment (Income) and Expenditure- 56 Group Cashflow Statement 95
Note 9    Taxation and Non-Specific Grant Income 57  
Note 10   Grant Income 57 Note 31   Details of Combining
Entities
96
Note 11   Property, Plant and Equipment 59 Note 32   Non-Material Interests in
other Entities
98
Note 12   Intangible Assets 62 Note 33   Financial impact of
Consolidation
98
Note 13   Heritage Assets 62 Note 34   Analysis of Material Items
of Group Income and Expenditure
98
Note 14   Assets held for Sale 63 Note 35   Group Accounting
Policies
99
Note 15   Private Finance Initiatives and Similar Contracts 64 Independent Auditor’s Report 100
Note 16   Operating Leases 65 Glossary of Terms 101
Note 17   Debtors 67  
Note 18   Cash and Cash Equivalents 67  
Note 19   Creditors 68  
Note 20   Provisions 68       
Page 124

Page 13

Page 1
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
Management Commentary 
Introduction
Welcome to the Financial Statements for West Dunbartonshire Council (the Council) and its group for the year ended
31 March 2025. The Statements have been compiled in accordance with the Code of Practice on Local Authority
Accounting in the United Kingdom (the Code). This Management Commentary will demonstrate the stewardship of
public funds entrusted to the Council and outlines the key messages regarding the performance of the Council over
the 2024/25 financial year as well as providing an indication of risks and issues which may impact upon the Council in
the future.   
Profile of West Dunbartonshire Council 
The Council is an average sized Council at around
71 square miles and has many strengths; including
significant sites of natural beauty and heritage,
good transport links and close proximity to Glasgow
and its airport. The area has a rich past, shaped by
its world-famous shipyards along the Clyde, and
boasts many attractions ranging from the iconic
Dumbarton Rock and the Titan Crane to the beauty
of Loch Lomond.
The Council is responsible for providing a wide
range of local authority services (including
education, housing, environmental health,
environmental services, planning, economic
development, employment, highways and
transport) to residents within the West
Dunbartonshire area. 
The Council is led by 22 councillors, elected every
five years to represent the residents within the area.
Following the Local Government elections in March
2022 the Council has had a Labour administration
with Councillor Martin Rooney as the Council
Leader.  The political make-up of the Council is ten
Scottish Labour Party, nine Scottish National Party,
four Independent and one West Dunbartonshire
Community Party. 
Page 125

Page 14

Page 2
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
The Council’s senior management structure consists of
the Chief Executive, seven Chief Officers, with the
Integration Joint Board (referred to as Health and Social
Care Partnership (HSCP)) managed at a senior level by
a Chief Officer 
The Council also has: 
• West Dunbartonshire Leisure Trust – an arm’s
length organisation which operates certain services
on the Council’s behalf
• Clydebank Property Company - a regeneration
company
• West Dunbartonshire Energy Company - an energy
generation company 99.9% owned by the Council. 
The Strategic Plan, Vision and Priorities 
The Strategic Plan 2022-27 sets out the Council’s
direction, with an emphasis on improving the lives of
residents and reducing inequality. Its vision is to ‘deliver
services which build on the strengths and resilience of our neighbourhoods and support all residents to fulfil their
individual potential, and that of their communities.’ This focuses on four key priorities: 
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
• Our Council - Inclusive and Adaptable 
These priorities reflect those set out in wider partnership plans such as Community Planning West Dunbartonshire’s
Local Outcomes and Improvement Plan and the West Dunbartonshire Health and Social Care Partnership Strategic
Plan. 
Specific objectives within each priority provide further detail, with progress measured through a suite of performance
indicators (PIs) and targets. 
Delivery Plans 
Delivery plans set out how the Strategic Plan priorities and objectives will be met. Developed annually for each strategic
area, they set out actions to deliver the Strategic Plan as well as actions to address the performance challenges and
service priorities identified in the planning process. They also provide an overview of services and resources, set out
the Performance Indicators (PIs) for monitoring progress, and consider the relevant risks. 
Performance Reporting 
Strategic Plan and Delivery Plans 
Performance against the PIs and Strategic Plan actions and associated Delivery Plans is reviewed and managed by
Chief Officers throughout the year and reported to Council and Committees for scrutiny twice yearly, at mid-year and
year-end. 
Page 126

Page 15

Page 3
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25 
The Strategic Plan progress report and Delivery Plan progress reports set out 2023/24 performance in detail while the
infographic based 2023/24 Annual Report, provides an overview across a wide range of areas including the Strategic
Plan, feedback from service users and residents, as well as budget and workforce information. 
The graph below summarises 2023/24 Strategic Plan performance, highlighting the outturn of the Plan’s 50 PIs
against the targets set for that year. 
Local Government Benchmarking Framework 
All 32 Scottish councils measure a common set of PIs called the Local Government Benchmarking Framework (LGBF).
This allows us to compare performance, identify best practice, learn from each other, and improve what we do. The
framework comprises 105 cost, satisfaction and service indicators covering a wide range of council services.
The table below provides a summary of our comparative performance in 2023/24, showing our performance against
the previous year, the Scottish average and our family group comprised of similar councils.  This is the most recent
year for which comparative data is available. 
Number of LGBF PIs Improved on
previous year
Better than Scottish
average
Better than family group average (i.e.
similar councils)
Cost (21 PIs) 62% (13) 62% (13) 57 (12)
Satisfaction (11 PIs) 9% (1) 64% (7)  64% (7)
Service performance (76 PIs) 46% (35) 46% (35) 45% (34) 
The graph summarises our comparative performance over the last six years, showing the percentage of indicators in
each of the four quartiles, with the first quartile representing the top eight performing councils and the fourth quartile
the bottom eight. 
66%20%
14%
Strategic Plan 2023/24
Performance against Targets
Target met or exceeded
Target narrowly missed
Target significantly missed
0%
20%
40%
60%
80%
100%
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24
33 26 28 28 24 24
24 30 21 30 33 28
17 18 22 16 13 20
26 26 29 26 30 28
Local Government Benchmarking Framework
Percentage of PIs by Quartile
1st Quartile 2nd Quartile 3rd Quartile 4th Quartile
Page 127

Page 16

Page 4
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25 
Key Achievements 2024/25 
Some of our key achievements in 2024/25 are highlighted below in relation to our four strategic priorities: 
Priority 1 – Our Communities are Resilient and Thriving 
The Council has: 
• Continued the Cost-of-Living Capital Fund
providing £1m of support to 39 Community
Groups
• Further invested in school’s summer
programme, sport and leisure activities for
children during holiday periods and family fun
days
• Provided a Youth Success Fund to support
activities which build the confidence, skills and
resilience of young people.
• Funded a range of community groups providing
food aid services.
• Reinstated swimming lessons for young people
with additional support needs and provided
water safety training lessons to over 1,100
children and young people
• Progressed a 19-unit development of specialist
Council homes for elderly residents in Old
Kilpatrick. 
In relation to education:   
• Our Lady and St Patrick’s (OLSP) High School in Dumbarton was awarded Inclusive School of the
Year in the prestigious 2024 TES awards.
• The Council was in the top five performing councils in Scotland for narrowing the attainment gap
in literacy and numeracy in primary schools.
• The first sod was cut to mark the official start of the building work at the new multimillion-pound
education and community campus at Faifley which is due to open in October 2025.
• Received strong inspection reports for St Mary’s Primary School & ELCC, Kilbowie Primary School
& ELCC, Bonhill Primary School and the Council was praised for its support for schools and their
continued improvement.
• School Leaver destinations improved to 96%, the best performance in a decade.
• Beat the Street engaged 4000 participants including pupils and families; this reduced car travel
and improved physical activity while strengthening school and community connections. 
Page 128

Page 17

Page 5
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25 
Priority 2 – Our Environment Promotes a Greener Future 
The Council has: 
• Established a Net Zero cooperation agreement with
Glasgow City Council, including a project board, with
working groups progressing a range of initiatives.
• Furthered the collaborative approach with the City
Region to increase resilience, share best practice
and identify opportunities in the delivery of the
Electric Vehicle Strategy and Waste Management
• Commenced work on energy efficient homes in
Pappert, Bonhill
• Been recognised for its work tackling damp and
mould in Council properties by being shortlisted in
the excellence in health and wellbeing category at
the Chartered Institute of Housing (Scotland)
Scottish Housing Awards. 
Priority 3 – Our Economy is Strong and Flourishing 
The Council has: 
• Settled the purchase of land from Esso at Bowling
along with five additional areas and concluded the
construction delivery contract for the infrastructure
at the Exxon site
• Rolled out a scheme to support traders in all three
West Dunbartonshire towns to deliver shopfront
improvements.
• Concluded the sale of the Playdrome site in
Clydebank to facilitate the construction of new
private housing.
• Contributed to numerous strands of the UK
Shared Prosperity Fund including providing
support to 180 new business start-ups and
delivering a range of business growth
interventions   • Secured planning permission for Phase 1 of the
Artizan redevelopment works in Dumbarton and
appointed the main contractor, with works
starting on site in Spring 2025.
• Supported Alexandria traders to establish the
Business Improvement District.
• Established the multi-agency Clydebank Town
Board and produced the Long-Term Plan and 3
Year Investment Plan to secure £20m funding
from UK Government
• Opened Posties Park, a flagship development to
deliver a state-of-the-art sports hub. 
Page 129

Page 18

Page 6
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25   
Priority 4 – Our Council is Inclusive and Adaptable 
The Council has:
• Won the Service Innovation and
Improvement COSLA Excellence Award for an
online missed bin Chatbot 
• Secured external funding to address digital 
exclusion by delivering a programme targeting
young people 
• Secured funding from Museums Galleries
Scotland to deliver a dedicated programme of
free heritage activity within the new Clydebank
Museum 
• Furthered digital improvements including
further automation of processes, implementing
new online forms and enabling cross
organisation collaboration for Council and NHS
employees to access both networks. 
• Achieved the Gold Award from the Defence Employer Recognition Scheme, maintained Disability Confident
status and reaffirmed its commitment to the Race @ Work Charter.
• Secured Raynet communications coverage, the first of its kind in Scotland, and provided resilience in the
event of an emergency/incident resulting in power outage.
• Further enhanced Cyber Security through Phishing awareness campaigns, development of cyber response
plan and investment in security measures. 
Council’s 2024/25 Budgets
Revenue
The Council approved the 2024/25 revenue budget on 6 March 2024 based on band D Council tax at £1,398.98. The
budget was set at £284.668m (as detailed in the table below) to be funded by Scottish Government Grant (£234.375m);
Council tax (£40.920m), with a net contribution from reserves and the service concessionary benefit for the remaining
(£9.373m).      
Budget (£m) % of budget
Resources 3,729 1%
Regulatory and Regeneration 3.569 1%
People & Technology 10.024 4%
Citizens, Culture and Facilities 14.153 5%
Education, Learning and Attainment 125.120 44%
Roads and Neighbourhood 14.917 5%
Housing and Employability 2.371 1%
Health & Social Care Partnership 86.726 30%
Miscellaneous Services 4.290 2%
Loan Charges 17.398 6%
Requisitions 2.370 1%
Total 284,668 100% 
Page 130

Page 19

Page 7
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
The budget was updated during the year for a number of variables, resulting in a final planned net expenditure of
£295.469m. The year-end revenue budgetary position is detailed on page 8 of this commentary. 
Capital 
On 6th March 2024 the Council also approved the revised capital plan with a planned General Services spend in 2024/25
of £76.757m.  In-year additional projects increased the planned spend by £5.429m to £82.186m and accelerated and
reprofiled budgets for 2024/25 of £23.668m resulted in an overall 2024/25 capital programme of £58.518m.  This
investment is funded from a range of sources including: government grants and ongoing council revenue. Major areas
of investment are economic regeneration, school modernisation, roads and infrastructure and a range of other council
assets. 
Housing Revenue Account 
On 6th March 2024 the Council agreed an increase in Council house rents of 6.7% and approved the Housing Revenue
Account budget and approved planned capital investment of £73.385m for 2024/25. The year-end revenue and capital
budgetary position is detailed on page 10 of this commentary. 
Overview of Core Financial Statements
The Statement of Accounts contains the Financial Statements of the Council and its group for the year ended 31 March
2025. The Council operates two main Funds: 
1. General Fund - expenditure and income associated with running council services (except the provision of council
houses). Predominantly funded by Scottish Government grant and council tax. 
2.  Housing Revenue Account - expenditure and income associated with the provision of council housing. Predominantly
funded primarily through rental income from tenants. 
Two major categories of expenditure are included in the financial statements:   
1. Revenue expenditure - day to day running costs incurred to provide services. 
2. Capital expenditure - cost of buying, constructing and improving Council assets. 
Expenditure is recorded in a number of the main statements in these accounts with the purposes of these main
statements being as follows: 
Page  Statement Statement Details
32 Comprehensive
Income and
Expenditure Statement
(CIES)
Income and expenditure for all Council services.
33 Balance Sheet A summary of the Council’s assets and liabilities. It is a
statement of the resources of the Council and the means by
which they have been financed.  It is also a snapshot of the
Council’s financial affairs at the close of the year expressed in
accounting terms.
34 Movement in Reserves
Statement
How the surplus/deficit on the Income and Expenditure Account
for the year reconciles to the movement on the General Fund.
Also highlights movement on all other reserves held on the
Council’s Balance Sheet.  Further information on each of the
reserves held and how they may be used is detailed within notes
24.
Page 131

Page 20

Page 8
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
35 Cash Flow Statement Inflows and outflows of cash arising from transactions with third
parties on revenue transactions and capital activities.  Cash is
defined for the purpose of the statement as cash-in-hand and
deposits repayable on demand less overdrafts repayable on
demand.
36-
86
Notes to the Core
Financial Statements  
Further information and analysis of each statement, including the
main accounting policies.
87 Housing Revenue
Account 
Income and expenditure for Council housing services for the year
and includes the Statement of Movement on the Housing
Revenue Account Balance 
2024/25 Financial Performance 
This account covers the day-to-day operational income and expenditure for each service of the Council and is reported
in line with the Council’s Chief Officers.  Income from council tax, non-domestic rates, capital and revenue support
grants was £312.167m with a net expenditure on services for the year of £291.656m (shown on page 32 – Net Cost of
Services). 
The Council’s financial performance is presented in the CIES on page 32 which shows a deficit on the provision of
service of £25.775m (represented by a £27.494m deficit on the General Fund and a £1.719m surplus in the HRA).  This
statement is prepared using International Financial Reporting Standards as interpreted by the Code.  However, it does
not reflect the true cost or the amount to be funded from taxation and government grant income.  Note 6 details the
accounting adjustments required to reflect performance against the use of reserves and statutory funds.   The
adjustments remove the impact of non-cash items such as depreciation, revaluation and replace these with the actual
cost of debt repayment.  Consequently, the general fund balance has decreased by £2.908m, against a planned use of
reserves during 2024/25 budget setting of £9.373m and a pension contribution saving of £9.688m.  The table below
shows a summary of the movements that contributed to the final position. 
As a result of the overall deficit, the General Fund reserves reduced from £15.371m to £12.463m.  The graph below
shows how the useable reserves of the Council are made up, including the £8.821m earmarked to support future budget
strategy which are detailed in Note 7. 
Budget
£'000
Actual
£'000
Variance
£'000 £'000
Total General Services Reserves Held at 1 April 2024 (15,371)
Resources 4,167 5,676 1,509
Regulatory and Regeneration 4,281 3,814 (467)
People & Technology 9,974 9,975 1
Citizens, Culture and Facilities 13,602 13,684 82
Education, Learning and Attainment 137,874 137,254 (620)
Roads and Neighbourhood 15,348 17,393 2,045
Housing and Employability 2,408 3,049 641
Miscellaneous Services 7,759 5,335 (2,424)
Health and Social Care Partnership 89,342 89,830 488
Loan charges 20,282 21,368 1,086
Capital Receipts to fund loan charges (2,884) (1,862) 1,022
Requisitions 2,370 2,369 (1)
Non GAE Allocation (9,055) (8,555) 500
Net Expenditure 295,468 299,330 3,862
Council Tax (40,920) (41,701) (781)
Revenue Support Grant/NDR (249,217) (249,217) 0
Revenue Budget Outturn Position 3,081 3,081
Budgeted use of Reserves 9,343
Top up Bad Debt Provision 172
Transfer SPFP saving to EMR (9,688)
Closing Useable Reserves Balance (12,463)
Page 132

Page 21

Page 9
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25 
The Council has a policy of holding a minimum of £6.012m uncommitted balance (3% of the Council’s budgeted net
annual running costs).  As at 31 March 2025 the Council had £3.640m of free reserves (1.82% of actual running costs)
which is below the prudential target.  In June 2024 the Council agreed a recovery plan to rebuild the reserves to the
required position.  The use of reserves is reviewed as part of the budget setting each year. 
Provisions
The Council has provisions totalling £0.650m on the Balance Sheet as detailed in Note 20 to the Accounts. 
Cash Flow Statement
The Council’s cash flow statement shows a decrease of cash and cash equivalents of £16.170m during 2024/25 (see
Note 18) mainly as a result of timing differences for repayment of debt.
Housing Revenue Account (HRA)
By law the Council maintains a separate account for the running and management of its housing stock and had 10,547
housing units at 31 March 2025 (2024: 10,444). The movement in year is follows: 
Opening House Number 10,444
Disposals (7)
Buy Backs 34
New builds 76
Closing House Number 10,547
The account reported a deficit for the year of £0.043m. In line with the prudential reserves policy (2% of expenditure),
the target reserves level for the HRA for 2024/25 was £1.064m. Taking account of the £0.358m in-year deficit and the
brought forward balance from the previous year of £0.969m, the reserves balance available to the HRA for future use
is £0.611m.  The reserves balance is therefore £0.453m below the prudential target. The Council aims to increase
HRA reserves over the medium term so that reserves are maintained at or above target. 
The HRA’s budget performance for the year is summarised in the following table. The table also highlights how the in-
year deficit affects the overall reserves balance held for future use. Further information is noted on page 86. 
0 2 4 6 8 10 12 14 16
As at 31 March 2024
As at 31 March 2025
Reserve Balances
Earmarked Unearmarked
£(m)
Page 133

Page 22

Page 10
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
Budget
Spend
against
Budget Variance
£'000 £'000 £'000 £'000
Total HRA Reserves Held at 1st April 2024 (969)
Total Expenditure 53,218 53,353 135
Total Income (53,218) (52,995) 223
Net Budgetary Control Position 0 0 0
Net transfer for earmarked reserves 358
Total HRA Reserves Held at 31 March 2025 (611)
The net budgetary position on the HRA Statement noted compares to the surplus noted within the HRA Income and
Expenditure Statement (page 86) as detailed below: 
£'000 £'000
(Surplus)/Deficit for the year on HRA services (1,719)
HRA Movement in Reserves
Adjustment to the revenue resource (7,687)
Adjustment between Revenue and Capital resources 9,502
transfer (to)/from other Statutory reserves 262
Movement in HRA revenue 2,077
Adjust for earmarked funds:
Use of earmarked sums 358
Net HRA budgetary control position 2024-25 716
HRA Reserves as at 1 April 2024 (969)
Use of earmarked sums 358
HRA reserve as at 31 March 2025 (611)
2024-25
Balance Sheet
The Balance Sheet on page 33 summarises the Council’s assets and liabilities as at 31 March 2025 and explanatory
notes are provided. The net worth of the Council has increased by £3.537m from £363.802m as at 31 March 2024 to
£367.339m as at 31 March 2025. The major changes are set out in the table below. 
31 March
2024 £’000
31 March
2025 £’000
Movement
£’000
Main Reason
Long-term Assets 1,191,795 1,284,680 92,885 Movement as a result of the revaluation
and indexation of non-current assets and
capital expenditure offset by in year
depreciation.
Current Assets 102,415 78,025 (24,390) Decrease in cash and cash equivalents
due to timing of repayment of debt and a
decrease in short term debtors due to
timing differences and an increased rate of
collection of council debt.
Current Liabilities (384,925) (401,947) (17,022) Increase in short-term borrowing to fund in
year to support the GS and HRA capital
programme.
Long-term
Liabilities
(545,483) (593,419) (47,936) Increase in long-term borrowing to support
HRA and GS capital programme.  Offset
by a decrease in the unfunded pension
liability.
Total 363,802 367,339 3,537 
Page 134

Page 23

Page 11
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25 
Pension Assets and Liabilities
The net asset arising from the Council’s involvement in the defined benefit scheme totals £463.737m as at 31 March
2025. However, this has been limited to nil in line with the accounting requirements of IFRIC 14 to limit the recognition
of a pension asset to the extent to which the Council can recover the benefits through either refunds or reduced
contributions. As the Council is not able to withdraw from the scheme or recover funds directly, the asset is therefore
limited to the forecast reductions in contributions as compared to the forecast future service costs. This has limited the
recognition of the pension asset to nil. 
The Council has continued to recognise the unfunded element of its pension liabilities as there are no scheme assets
to cover the future costs of these liabilities as they are due going forward.  The increase in the pension asset is mainly
as a result of strong investment returns and an increase in discount rate resulting in lowering the value placed on the
obligations as at 31 March 2025, partially offset by future pension, and salary decrease assumptions. The appointed
actuaries remain of the view that the asset holdings of Strathclyde Pension Scheme and the contributions from
employees and employers provide sufficient security and future income to meet future pension liabilities. 
Non-Current Assets
The Council owns a number of different types of assets, as listed in the Balance Sheet. These assets are used for
ongoing and future service delivery provided by the Council to its residents. The remit for the Council’s Strategic Asset
Management Group is to ensure the most efficient use of these assets in pursuit of the Council’s strategic priorities. The
Group manages this through ongoing review of the overarching Strategic Asset Management Plan, which is then
supported by a number of individual Asset Management Plans (including properties, infrastructure, vehicles and
equipment, etc.). 
The Council requires to assess the value of assets held based on current market conditions. During 2024/25 particular
assets have increased in value by £14.117 however, at the same time, impairment and downward revaluations have
reduced the value of other Council assets by £12.275m, resulting in a net increase in value of £1.842m. These
movements adjust either the revaluation reserve in the Balance Sheet or are included within the Net Cost of Service
within the Income and Expenditure Statement, depending on the history of the asset.
Borrowing
The Council’s 2024/25 Treasury Strategy was agreed by the Council on 27 March 2024. The Council raised new long-
term loans of £65.000m (2023/24 £174.00m) and short-term loans of £259.300m (2023/24 £244.591m) and repaid
naturally maturing debt of £243.000m (2023/24 £315.000m). 
The total outstanding long-term debt (excluding PPP debt) as at 31 March 2025 was £469.167m (2023/24 £460.840m)
including £216.581m (2023/24 £204.613m) for the Council’s housing stock.  The total outstanding short-term debt was
£334.602m (2023/24 £267.598m), including £154.462m (2023/24 £118.813m) for the housing stock. 
The interest and expenses rate charged by the Council’s loans fund was 4.64% (4.05% in 2023/24). 
Capital Finance
The Council is able to regulate its own capital spending limits within the framework recommended by the Chartered
Institute of Public Finance and Accountancy and endorsed by the Scottish Government. The necessary treasury
indicators and safeguards have been approved by Council.  The Council’s Treasury Management Strategy and Capital
Strategy are approved at Council. Details of the capital expenditure and financing are shown in note 11 on page 61.
Total gross capital expenditure amounted to £112.339m with the split between £55.736m for General Services and
£56.603m for the HRA. The main capital projects progressed during 2024/25 were: 
Page 135

Page 24

Page 12
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
General Services HRA
Dumbarton Town Centre - Levelling Up Fund Void House Strategy Programme
Exxon City Deal Window/door renewals
Faifley Campus Kitchen/Bathroom/shower upgrades 
Heating Improvement works 
During 2024/25, the Council had budgeted capital expenditure of £122.178m with an actual in year spend of £112.339m.
The unspent amount (£9.839m) includes overspends, underspends and reprofiling, as noted within the table below. The
total reprofiling on planned spend was £7.358m – 6.02% (2023/24 31.78%) of the overall capital. 
Budget Actual Spend Variance Overspend Underspend Reprofiling
Service £'000 £'000 £'000 £'000 £'000 £'000
Corporate Services 4,164 5,958 (1,794) 2,544 (262) (488)
Education 24,233 23,555 678 1,385 0 (2,063)
Infrastructure, Regeneration & Development 28,930 25,005 3,925 859 0 (4,784)
Miscellaneous Services 1,190 1,218 (28) 51 0 (23)
General Services Total 58,517 55,736 2,781 4,839 (262) (7,358)
HRA 63,661 56,603 7,058 7,148 (14,206) 0
Total 122,178 112,339 9,839 11,987 (14,468) (7,358)
The majority of the reprofiling has occurred within a number of larger capital projects and is mainly due to the timing of
starting individual projects, for various reasons, not all within Council control, and the delayed spend on these projects
moved into capital budgets for 2024/25 onwards. The most significant reprofiling was experienced against the following
projects: 
General Services
Schools Estate Improvement
Plan
Works Progressing. Projects anticipated to complete in 2024/25. 
Vehicle Replacement Delay due to the vehicle build time associated with the specialist vehicles and the
delivery lead time from the date of supply order placement.
Levelling Up Fund Artizan masterplan approved in November 2023. Designs are progressing as
planned but some delays due to enabling works and commencement of the
design phase 
Public Private Partnership (PPP) and other Long-Term Liabilities
The Council entered into a PPP for the provision of three community learning centres and a primary school providing
the Council with replacement buildings for three secondary schools which were handed over in 2009/10 with the primary
school handed over during 2011/12. In accordance with statutory accounting guidance, full detail is provided within note
15 on pages 64 to 65. 
On 31 March 2016, the Council entered into a 25 year ‘Design, Build, Finance and Maintain’ (DBFM) arrangement with
the Scottish Government via the Scottish Futures Trust, for the provision of a further new secondary school. The school
was handed over for use by the Council during 2017/18. The detail is also included within note 15.
Group Accounts
Local authorities are required to prepare group accounts in addition to their own Financial Statements where they
have material interest in other organisations.  The group accounts on pages 93 to 100 consolidate the Council’s
Financial Statements, the Common Good and Trust Funds and four other entities (including two further subsidiaries –
West Dunbartonshire Leisure Trust and Clydebank Property Company). The effect of combining these entities on the
Group Balances Sheet is to increase reserves and net assets by £xx.xxxm creating an overall net asset of £xxx.xxxm.
Page 136

Page 25

Page 13
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
As there is no reason to suggest the future funding to these organisations will not continue, the accounts have been
prepared on a going concern basis.
The Financial Outlook, Key Risks and the Future 
In setting the 2025/26 budget on 5 March 2025, the Council faced a number of significant financial pressures resulting
from historic real term reductions in government funding, inflationary pressures, in particular the impact of bank interest
rates, service demand increases and local government pay awards not being fully funded.   
The 5 March 2025 Council meeting also approved the updated General Fund capital plan, the 2025/26 HRA revenue
budget and the updated 5-year HRA capital plan. The capital plans include funding for several projects over the next
five years and the revenue impact of these investments is built into future revenue plans.   
Following the setting of the budget in March 2025, budget projections identified expected budget gaps in the mid-range
scenario of £9.264m in 2026/27 rising cumulatively to £42.823m in 2029/30. At a Council meeting on 18 June 2025 a
further Financial Update was presented which adjusted these gaps to reflect changes to budget assumptions and cost
pressures.  This resulted in amended estimated mid-range scenario budget gaps of £8.274m in 2026/27 rising
cumulatively to £41.337m in 2029/30. 
The Council received a cash increase as part of the 2025/26 settlement which was significant in comparison to previous
years however, it was largely funded through significant increases in revenue being raised through taxation and
increased investment in UK public spending. It is not considered realistic to assume similar increases in future years. If
the Council continues to receive real term funding cuts, there will continue to be a need to review the manner in which
services are delivered and the level they are delivered at. 
Management of Risk
The main financial risks identified by the Council over the medium and long term include: 
• the unknown position from government on future funding levels particularly given the ongoing decline in Council
population, and historic real term reductions in local government funding
• changing demands and needs for Council services (particularly in relation to older people)
• continued inflationary pressures and interest rates which impact on the cost of service delivery and the delivery of
capital programmes
• ongoing ring fencing of funds made available to local government which restrict the options to the council in
relation to service delivery
• ongoing discussions with the Scottish Government about the provision of funding in relation to maintaining
teacher numbers
• the impact of pay award negotiations and the extent to which responsibility for funding these is shared by the
Scottish Government. 
The Annual Governance Statement, shown on pages 19 to 23, details the arrangements the Council has put in place
for the proper governance of the Council’s affairs and for the management of risk. This Statement explains the system
of internal control in place and sets out improvement actions to the governance framework identified from the
Council’s ongoing review of these arrangements. 
Risks are identified with actions to minimise and/or mitigate those risks (where possible) through the Council’s
performance monitoring system (Pentana), which is reported to Members on a regular basis. 
The Future
In recognition of the scale of the current financial challenge the Council will continue to identify service redesign and
business transformation options, and these will be reported to appropriate committees during 2025/26. 
A number of major projects continue to be progressed as follows:
Page 137

Page 26

Page 14
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25 
Glasgow City Region City Deal – the Council, together with a number of other Scottish local authorities, is participating
in the Glasgow Region City Deal which will see over £1.1 billion invested in the area. The City Deal consists of a number
of significant capital projects across the area together with employability projects – to generate economic regeneration
and additional jobs. The project within the City Deal specific to the Council is an infrastructure project at the Exxon site
at Bowling to regenerate the site and to create a relief road along the A82 at Milton.  Council and Glasgow City Region
Cabinet approved a reduced project scope in October 2024 and February 2025 respectively, in response to increasing
costs. The detailed design and land remediation completed during 2024 allowing the land transfer of the site to the
Council in early January 2025. The enabling infrastructure works began on site 27 January 2025 and works continue to
progress well. 
In addition, the proposed Scottish Marine Technology Park at a former oil storage site in Old Kilpatrick was shortlisted
for up to £20m of Investment Zone funding through Glasgow City Region in February 2025. This funding award has the
potential to accelerate the regeneration of this second strategic site on the banks of the River Clyde and contribute to
the sustainable economic growth of the area. 
The Council has also secured £1.8m from the Glasgow City Region’s Enabling Commercial Spaces Project. This will
support the development of two projects, one being an up-grade of existing industrial units integrating low-carbon
heating systems and other sustainable solutions where feasible, and the other being new build commercial units. Both
projects will create spaces that are energy-efficient and environmentally responsible while contributing to the economic
regeneration of West Dunbartonshire. 
Development of Queens Quay – The Council’s investment of £15.62m in Queens Quay over the past five years has
helped fund the infrastructure needed to prepare the site for redevelopment. In collaboration with the development
partners, good progress has been made on key developments, including the completion of the District Heating Energy
Centre, new Care Home, social housing development, a partnership between Council, Wheatley Group and Clydebank
Housing Association, and the new NHS Clydebank health centre. Housing development plots continue to be marketed
to fulfil the ambition of delivering up to 1,000 new homes on Queens Quay and the Council is in dialogue with the
landowner and the Scottish Government on how development can be progressed.   
The District Heating Energy Centre Energy provides the heat source for existing and new developments at Queens
Quay and work continues to explore funding opportunities to progress new connections and support the Council’s net-
zero ambitions. 
Levelling Up Fund – The Levelling Up Fund is a capital fund to address systemic weaknesses in the economies of the
UK’s towns and cities. The first round of the Levelling Up Fund was announced at the 2020 Spending Review with an
aim to support communities in realising this vision. The Council were successful, as part of round 1, in securing £19.9m
for three interlinked regeneration projects in Dumbarton town centre. These include the re-use of the listed Glencairn
House (construction underway) as a town centre library and museum, the redevelopment of the largely vacant and run-
down Artizan Centre (underway) and Connecting Dumbarton (complete) which will improve walking and cycling routes
in the town centre. The funding programme runs to March 2026, with a possibility of extension to March 2027, but many
of the positive regeneration outcomes will be longer term. 
Plan for Neighbourhoods Fund – Clydebank was selected by the UK Government as part of the Government’s broader
Levelling Up programme to receive £20m of Plan for Neighbourhoods Fund (formerly known as Long-Term Plan for
Towns); one of ten towns in Scotland to receive this funding. The guidance and timescales of the Fund were amended
following the general election in July 2023. Delivery funding will be released from 2026 over a 10-year period and split
into 75% capital funding and 25% revenue funding. In line with the UK Government’s guidance, a Clydebank
Neighbourhood Board (formerly known as Town Board) has been established with an independent Chair to direct the
use of the Fund in partnership with the Council. The funding will be spent on locally identified priorities, with the aim to
achieve strategic objectives of thriving places, stronger communities, and taking back control. The Council is the
accountable body for the funding. 
Shared Prosperity Fund – The UK Shared Prosperity Fund (SPF) was established, in part, to replace funds available
through the European Structural Funds. West Dunbartonshire was allocated up to £3.9m and our priorities centred on
community and place, supporting business, people and skills and multiply. The planned activities progressed well, and
Page 138

Page 27

Page 15
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
we achieved our stated aims and expenditure as anticipated by March 2025.  The programme has been extended for a
further year with West Dunbartonshire allocated a further £1.694m. During the forthcoming year we will use these
additional funds to consolidate the ‘Support for Business’ projects and incorporate ‘Multiply’ into our successful ‘People
and Skills’ activity.  The programme guidelines require approximately 23% of this to be allocated to capital projects. With
this in mind, we will invest in ‘Community and Place’ priorities by focusing on projects within the Strategic Framework
for Physical Activity, Wellbeing, Sport, Play and Active Travel. 
Net Zero Collaboration - Council and Glasgow City Council (GCC) have agreed to work collaboratively on their shared
Net Zero objectives and toward meeting targets, set by the Scottish Government, related to the ‘Climate Change
(Scotland) Act 2009’ and ‘Climate Change (Emissions Reductions Targets)(Scotland) Act 2019’. A WDC/GCC
Collaboration Board has been formed to oversee progress.   
The stated mission is: ‘To bring together officers from both West Dunbartonshire Council and Glasgow City Council to
collaborate on projects to support both Council’s collective ambition of becoming net-zero and supporting the national
ambition of being net zero emissions by 2045’. 
To achieve the mission we will consider opportunities to collaborate on land-use, securing climate investment and share
lessons learned on exemplar projects to inform future projects. By acting on areas of common interest and opportunity
within the net zero agenda we will elevate and add value to benefits for both councils. 
Other Information
Asset Management
The Council has a significant investment embedded in assets, comprising offices, schools, vehicles, houses, ICT
infrastructure and equipment.  It is important these are managed in an efficient and effective manner. The Council has
an overarching Corporate Asset Framework and Property Asset Plan 2023-2028 which was approved by Committee in
February 2023.  In addition, there are service specific Asset Plans covering Open Spaces, Roads Structures, Housing
and Vehicle, Fleet and Plant which were all approved at the relevant service committees and will undergo refreshes in
future years. We continue to identify any areas of over provision or inefficient value within the Council’s assets in line
with the Property and Land Disposal Strategy 2021-2026. 
Equality and Diversity
The Council is firmly committed to the principle of equality of opportunity. The Council recognises its responsibility as a
community leader, service provider and employer to encourage the fair treatment of all individuals and to tackle social
exclusion. The Council is also committed to eradicate all forms of discrimination, direct or indirect and aims to eliminate
discriminatory practices and promote measures 
to combat its effects. 
Information on the Council’s Equality Outcomes and Mainstreaming Plan 2025-2029 can be found on the Council
website at Equality Scheme 
Consultation and Communication with Workforce 
The Council has employee governance arrangements to ensure its employees are well informed, involved in
decisions, appropriately trained, treated fairly and consistently and provided with a safe environment. The Council
carries out regular employee engagement and seeks the views of the workforce through regular consultations with
staff and trade unions. 
Carbon Emissions and Energy Consumption 
The Council approved a Climate Change Strategy in November 2020 which has set an overall target to reduce carbon
emissions to 'net zero' by 2045 which will align with Scottish Government targets.  This includes two interim targets of
a 61% reduction by 2030/31 (versus 2012/13 baseline) and 87% reduction by 2040/41 (versus 2012/13 baseline). 
The Council did not meet its annual target to reduce carbon emissions as set out in the Carbon Management Plan,
emitting a total of 27,549 tonnes of carbon dioxide from our operations in 2023/24.  This equates to a 19% increase
Page 139

Page 28

Page 16
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
against the previous financial year 2022/23 (23,150 tonnes).   However, it still represents a 16.42 % reduction overall
against the 2012/13 baseline year (32,961 tonnes). The main reason for the significant increase in Carbon dioxide
emissions is due to more information being available with respect to waste and addition of waste items not previously
reported.                                                                 
Annual progress of the Climate Change Action Plan is monitored through annual reporting to the Council’s Infrastructure,
Regeneration & Economic Development (IRED) Committee and additionally monitored as part of the Regulatory and
Regeneration Services Delivery Plan twice per year to Corporate Services and IRED Committees.  Furthermore,
progress on the Action Plan is monitored via the Climate Change Action Group and reported to the senior management
team on a quarterly basis. 
Remuneration Report
This report presents information on the remuneration of senior elected members and senior officers within the Council
(pages 24 to 31). 
Financial Performance Indicators
This commentary includes information on a set of financial performance indicators. These are aimed at providing the
reader with a summary of key information and are summarised in the following table:
2023/24
Outturn
General Services Performance 2024/25
Target
2024/25
Outturn
£0.70 Cost of collecting council tax (per
dwelling)
Demonstrates the Council's effectiveness in
collecting local taxation
£3.00 £0.68
13.68% Council tax as a percentage of
overall funding
Demonstrates the amount of budget raised
through council tax
n/a 14.10%
93.20% In-year council tax collection rate Demonstrates the Council's effectiveness in
collecting local taxation
93.50% 93.80%
39.513m Amount of income from council tax
for the year that was received
Demonstrates the Council's effectiveness in
collecting local taxation
n/a £39.909m
92% Value of free reserves expressed
as a percentage of the prudential
reserve target
Demonstrates how much free reserves the
GS has, in comparison to the agreed minimum
100% 61%
2.76% Value of free reserves expressed
as a percentage of the net annual
budget
Demonstrates the percentage of budget
covered by free reserves
3.00% 1.82%
£(0.573)m Movement in the free reserve
balance
Demonstrates variances contributing to the
overall free reserve position
n/a £-2.616m
102.57% Revenue budget compared to actual
outturn at year end  - including top
up of provisions
Demonstrates actual spend as a percentage
of the planned budget (less than 100%
indicates an underspend)
n/a 1.01%
2023/24
Outturn
Prudence And Affordability – Capital 2024/25
Target
2024/25
Outturn
7.43% Ratio of financing costs to net revenue
stream (excluding PPP) – General Services
Demonstrates how much of the General
Fund revenue budget is used to support
previous capital investment
12.21% 7.25%
41.90% Ratio of financing costs to net revenue
stream – HRA
Demonstrates how much of the HRA
revenue budget is used to support previous
capital investment
42.68% 50.37%
£787.098m Capital Financing Requirement The amount of planned capital expenditure
not yet funded
£891.537m £877.793m
£814.994m External Debt Levels (including PPP) The amount of external debt held by the
Council. Increases due to funding of the
capital programme
£860.112m £886.622m
Page 140

Page 29

Page 17
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2024/25
2023/24
Outturn
Housing Performance 2024/25
Target
2024/25
Outturn
99% Value of free reserves expressed as a
percentage of the prudential reserve
target
Demonstrates how much free
reserves the HRA has, in comparison
to the agreed minimum
100% 57%
1.97% Value of free reserves expressed as a
percentage of the net annual budget
Demonstrates the percentage of
budget covered by free reserves (2%
minimum target)
2.00% 1.15%
£(0.044m) Movement in the free reserve balance Demonstrates variances contributing
to the overall free reserve position
n/a (£0.358m)
100.00% Revenue budget compared to actual
outturn at year end
Demonstrates actual spend as a
percentage of the planned budget
(less than 100% indicates an
underspend)
n/a 100%
Where to find more information
In This Publication - An explanation of the Financial Statements and their purpose are shown at the top of each page.
The accounting policies and a glossary of terms can be found at the end of this publication, and these provide an
explanation of the main guidelines and terms used. 
On Our Website - Further information about the Council can be obtained on the Council’s website (West Dunbartonshire
Council https://www.west-dunbarton.gov.uk/) or from Finance Services, 16 Church Street, Dumbarton, G82 1QL. 
Conclusion
The financial results show the Council’s has had a challenging year from a financial perspective and the general fund
has decreased due to a combination of a planned use of reserves and a need to absorb an in year deficit due primarily
to lower than forecast in year capital receipts (used to fund principle loan charges), and overspends across a number
of the service areas. The Council continue to face a challenging financial future due to real term reductions in funding
and this puts further pressure on front line service delivery. The Council’s Financial Statements continue to be reported
on a going concern basis. 
Acknowledgement
The production of the Annual Financial Statements is very much a team effort and we wish to record our thanks to both
Finance staff and to colleagues in all services whose efforts have contributed to the completion of these Statements of
Accounts. 
Councillor Martin Rooney  Peter Hessett    Laurence Slavin
Leader of the Council   Chief Executive    Chief Officer - Resources
Date: 18 June 2025   Date: 18 June 2025   Date: 18 June 2025
Page 141

Page 30

Page 18
Statement of Responsibilities                                 
West Dunbartonshire Council Annual Accounts 2024/25 
The Council’s Responsibilities
The Authority is required to:
• Make arrangements for the proper administration of its financial affairs and to secure that one of its officers
has the responsibility for the administration of those affairs (section 95 of the Local Government (Scotland)
Act 1973).  In this authority, that officer is the Chief Officer – Resources.
• Manage its affairs to secure economic, efficient and effective use of resources and safeguard its assets;
• Ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority Accounts
(Scotland) Regulations 2014 and so far as is compatible with legislation in accordance with proper accounting
practices (Section 12 of the Local Government in Scotland Act 2003). 
• Approve the Annual Accounts for signature.
I confirm that these Annual Accounts were authorised for issue on 18 June 2025.
Signed on behalf of West Dunbartonshire Council 
Councillor Martin Rooney
Leader of the Council 
The Chief Officer - Resources Responsibilities
The Chief Officer – Resources is responsible for the preparation of the Council’s Annual Accounts, in
accordance with proper practices as required by legislation and as set out in the CIPFA/LASAAC
Code of Practice on Local Authority Accounting in the United Kingdom (“The Accounting Code”). 
In preparing the Annual Accounts, the Chief Officer - Resources has: 
• Selected suitable accounting policies and then applied them consistently. 
• Made judgements and estimates that were reasonable and prudent. 
• Complied with legislation. 
• Complied with the Local Authority Accounting Code (in so far as it is compatible with
legislation). 
The Chief Officer – Resources has also:
• Kept adequate accounting records which were up to date. 
• Taken reasonable steps for the prevention and detection of fraud and other irregularities. 
• Signed and dated the Balance Sheet. 
I certify that the financial statements give a true and fair view of the financial position of the local
authority and its group at the reporting date and the transactions of the local authority and its group
for the year ended 31 March 2025. 
Laurence Slavin
Chief Officer - Resources
Page 142

Page 31

Page 19
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2024/25
Annual Governance Statement
The Annual Governance Statement explains the Council’s governance arrangements as it meets the requirements of
the “Code of Practice for Local Authority Accounting in the UK” (the Code) and reports on the effectiveness of its
system of internal control, including the reliance placed on the governance frameworks of our partners. It is included
within the Council’s Financial Statements to assure stakeholders on how the Council directs and controls its functions
and how it relates to communities in order to enhance transparency and scrutiny of the Council’s activities.
Scope of Responsibility
The Council is responsible for ensuring its business is conducted in accordance with the law and proper standards, and
public money is safeguarded and properly accounted for, and used economically, efficiently and effectively. It also has
a statutory duty to make arrangements to secure best value under the Local Government in Scotland Act 2003. 
In discharging this responsibility, the Council's Elected Members and Senior Management Team (SMT) are
responsible for putting in place proper arrangements for the governance of its affairs and facilitating the effective
exercise of its functions, which includes arrangements for the management of risk. The Council has established an
arms-length external organisation: West Dunbartonshire Leisure Trust – to deliver leisure services more effectively on
the Council’s behalf, which reports regularly to Elected Members. From 1 July 2015 the West Dunbartonshire Health
and Social Care Partnership was established to continue the development of the integration of social care and health
services between the Council and NHS Greater Glasgow and Clyde. 
The Council has approved and adopted a Local Code of Corporate Governance (the Local Code), which is consistent
with the principles of the Chartered Institute of Public Finance and Accountancy (CIPFA) and the Society of Local
Authority Chief Executives (SOLACE) Framework: “Delivering Good Governance in Local Government”. The Local
Code evidences the Council's commitment to achieving good governance and demonstrates how it complies with the
governance standards recommended by CIPFA. A copy of this Code is available from the Council website at:
http://www.west-dunbarton.gov.uk/media/4312582/wdc-local-code.pdf
This statement explains how the Council expects to comply with the Local Code and also meets the Code of Practice
on Local Authority Accounting in the UK, which details the requirements for the Annual Governance Statement. 
The Purpose of the Governance Framework
The governance framework comprises the systems, processes, and culture and values by which the Council is directed
and controlled and through which it accounts to and engages with communities. It enables the Council to monitor the
achievement of the strategic objectives set out in the Strategic Plan and whether they have led to the delivery of
appropriate and value for money services. 
The Council has a system of internal control to manage risk to a reasonable level. Internal controls cannot fully
eliminate risk of failure to achieve policies, aims and objectives and can therefore only provide reasonable assurance
of effectiveness. The system of internal control is based on an ongoing process designed to:
• identify and prioritise the risks to the achievement of the Council's policies, aims and objectives
• evaluate the likelihood of those risks being realised and the impact should they be realised
• manage the risks efficiently, effectively and economically. 
The governance framework has been in place at the Council for the year ended 31 March 2025 and up to the date of
the approval of the Statement of Accounts. 
The Governance Framework
The main features of our governance arrangements are described in the Local Code but are summarised below: 
• The overarching strategic vision and objectives of the Council are detailed in the Strategic Plan 2022/27, which
sets out the Council’s key priorities and key outcomes the Council is committed to delivering with its partners, as
set out in the Local Outcome Improvement Plan.
• Services are able to demonstrate how their activities link to the Council's vision and priorities through their
Delivery Plans. Performance management and monitoring of service delivery is reported through service
committees and monitored by the SMT. The Council regularly publishes information about its performance.
Page 143

Page 32

Page 20
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2024/25
• The West Dunbartonshire Community Alliance, which supports Community Planning West Dunbartonshire,
represents the views of community organisations, communities of interest and geographical communities.  The
Council has an Engaging Communities Framework setting out its approach to engaging with citizens, community
organisations and stakeholders. Consultation on the future vision and activities of the partnership is undertaken in
a range of ways, including seeking the views of the Alliance and through specific service consultations. 
• The Council has adopted a Code of Conduct and employment policies for its employees. Elected members
adhere to the nationally prescribed Code of Conduct for Members in a localised format. The Council also has a
protocol on member/officer relations and an inter-party protocol.
• The Council has procedural framework which incorporating a Scheme of Delegation, Standing Orders and
Financial Regulations. These describe the roles and responsibilities of Elected Members and officers and are
subject to regular review. The Council facilitates policy and decision making through the agreed committee
structure.
• Responsibility for operating an effective system of internal financial control rests with the Council’s Chief Officer
Resources as Section 95 Officer. The system of internal financial control is based on a framework of regular
management information, the Financial Regulations, administrative procedures (including separation of duties),
management and supervision, and a system of delegation and accountability. Development and maintenance of
the system is undertaken by managers within the Council.
• The functions of the Audit Committee are undertaken as identified in CIPFA Guidance - Audit Committees:
Practical Guidance for Local Authorities.
• The Council’s approach to risk management is set out in the Risk Management Framework. A strategic risk
register is in place and an update report is regularly submitted to the Corporate Services Committee and Audit
Committee. The approach is embedded within the Council’s strategic planning and performance management
framework with regular reporting of risk management arrangements to service committees.
• Comprehensive arrangements are in place to ensure Elected Members and officers are supported by appropriate
training and development.
• The Council has adopted a response for fraud and corruption risks and commits to maintain its vigilance to tackle
fraud in accordance with the Code of Practice on Managing the Risk of Fraud and Corruption.
• The Council continues to assess and monitor ongoing compliance with the CIPFA Financial Management Code. 
Review of Effectiveness
The Council has a responsibility to review, at least annually, the effectiveness of its governance framework including
the system of internal financial control. The review of effectiveness of the framework is informed by the work of the
SMT which has responsibility for the development, implementation and maintenance of the governance environment,
the Shared Service Manager – Audit & Fraud’s (the Council’s Chief Internal Auditor) annual report; and reports from
the external auditors and other review agencies and inspectorates. 
The Council’s current Code of Good Governance was approved at the Audit & Performance Review Committee on 8
March 2017.  Compliance with the Code of Good Governance is supported by a process of self-assessment and
assurance certification by Chief Officers and the outcome of this assessment was reported to the Audit Committee on
11 June 2025. 
Each Chief Officer was presented with a self-assessment checklist to complete and return as evidence of review of
the seven key areas of the Council’s governance framework providing assurance for their service areas. 
The Audit Committee performs a scrutiny role in relation to the application of the Code of Good Governance and
regularly monitors the performance of the Council's Internal Audit service.
In relation to the effectiveness of governance arrangements and systems of internal control for the Council’s group
entities, the Council places reliance upon the individual bodies’ management assurances in relation to the soundness
of their systems of internal control.
The Internal Audit service operates in accordance with the Public Sector Internal Audit Standards (PSIAS) 2017 and
reports to the Audit Committee.  An annual programme of work is determined and undertaken by Internal Audit,
approved by the Audit Committee, based upon an established risk-based methodology. The Shared Service Manager
– Audit & Fraud provides an independent opinion on the adequacy and effectiveness of the Council’s System of
Internal Control. 
Page 144

Page 33

Page 21
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2024/25
The Audit Committee performs a scrutiny role in relation to the application of PSIAS and regularly monitors the
performance of the Internal Audit service. The Council's Shared Service Manager – Audit & Fraud has responsibility
for reviewing independently and reporting to the Audit Committee annually, to provide assurance on the adequacy and
effectiveness of the Standards and the extent of compliance.  From 1 April 2025 the new Global Internal Audit
Standards came into effect for the UK Public Sector and a transition plan is in place to ensure the Internal Audit
service is compliant with the requirements by 31 March 2026.  
It is our view that the Council has in place a sound system of internal control and that appropriate mechanisms are in
place to identify areas of weakness. This is corroborated by an annual assurance statement prepared by the Shared
Service Manager – Audit & Fraud stating that the overall control environment opinion was “Generally Satisfactory with
some improvements needed” such that reasonable assurance can be placed upon the adequacy and effectiveness of
the Council's internal control systems.  There was one audit which received an overall opinion of “Requires
Improvement”, namely Housing Repairs and Maintenance.  An action plan is in place to address all issues identified in
relation to the audit which will be monitored and reported to SMT and Audit Committee.
Due to vacancies arising in the team, some 2023/24 audits were completed in the first six months of 2024/25 which
has impacted on the completion of the 2024/25 audit plan.  However, the overall audit plan is set within the context of
a multi-year approach to audit planning such that key risk areas are reviewed over a 5-year cycle.
The system of governance (including the system of internal control) can provide only reasonable and not absolute
assurance that the assets are safeguarded, that transactions are authorised and properly recorded, that material
errors or irregularities are either prevented or would be detected within a timely period and that significant risks
impacting on the achievement of the Council's objectives have been mitigated. 
Governance Issues and Planned Actions
The following main issues and areas for improvement during 2024/25 have been identified through the self-
assessment exercise carried out by Chief Officers against key aspects of the Code of Good Governance.  These will
be monitored as part of the next annual review in 2025/26.
Improvement Area identified by 2024/25 Exercise Responsible Officer
Embedding Be the Best Conversations within all service teams. Chief Officer Citizen, Communities
and Facilities Management
Business Classification Scheme will be rolled out to relevant service areas
in relation to electronic records.  
Chief Officer, Resources
Work is ongoing to implement the Council’s information classification policy
and procedure as part of the Microsoft Office 365 project.
Data Protection/Information
Governance Officer  
Process for reporting on the status of external audit actions regularly to
Audit Committee will be developed and implemented.
Chief Officer, Resources
Guidance for keeping school funds has been updated, following audit.
Work with establishments to ensure compliance with guidance
Chief Officer, Education, Learning
and Attainment
Improvements have been recognised in terms of how global share is
organised in relation to how we structure our data on the shared drive and
comply with document retention timescales. Preparation for move to
Microsoft 365 in session 2025/26.
Chief Officer, Education, Learning
and Attainment
There are different induction and performance appraisal processes across
HSCP services reflecting the differences in organisations.  Work is ongoing
to review and improve the induction process.
Chief Officer, HSCP
Weekly, monthly and quarterly management information is supplied to all
HSCP managers and relevant governance forums however it is recognised
these reports could be further developed to improve the quality of the data
and ensure the provision of robust management information across the
HSCP.  
Chief Officer, HSCP
In relation to self-evaluation, it is recognised that the HSCP would benefit
from a more structured approach to self-evaluation.
Chief Officer, HSCP
Page 145

Page 34

Page 22
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2024/25
In relation to staff training and development, it is recognised this is an area
for improvement with clarity of input from partners to be achieved.
Chief Officer, HSCP
Succession planning is recognised as an area of improvement for the
HSCP and positive steps have been taken to address this.
Chief Officer, HSCP
Key business continuity plans are in place.  Work is ongoing to develop
business impact analysis documentation across the HSCP.
Chief Officer, HSCP
Levels of procurement compliance remain consistent, but it is recognised
further work is required to strengthen procurement and commissioning and
arrangements to ensure costs and risks are managed appropriately.
Chief Officer, HSCP  
Improvement actions arising from external inspection are monitored by the
HSCP Board however further work is required in this area.
Chief Officer, HSCP
Financial procedures are being developed for Area Resource Group to
ensure risk focused decision-making underpins all agreed packages of
care/placements to care homes and an escalation pathway to ensure Chief
Officer sign off where there is potential for emergency care packages to
breach regulations. 
Chief Officer, HSCP 
The 2023/24 Annual Governance Statement highlighted a range of areas for improvement during 2024/25. The
following table provides an update on progress with these with a number having been 
completed or are areas which continue to have an ongoing focus: 
Improvement Area identified by 2023/24 Exercise Status
Embedding Be the Best Conversations within all service teams. Ongoing
Work is required in some services to review and update business continuity planning
documentation.
Complete
Business Classification Scheme will be rolled out to relevant service areas.   Ongoing
Work is ongoing to implement the Council’s information classification policy and procedure as
part of the Microsoft Office 365 project.
Ongoing
The refreshed engagement policy and procedure is being reviewed and will be presented for
approval in September 2024.
Complete
Process for reporting on the status of external audit actions regularly to Audit Committee will be
developed and implemented.
Ongoing
A review of Guidance for Administration of School Funds is underway following an Internal
Audit review.
Ongoing
Action plans arising from reviews and inspections from Statutory Bodies including HMIE and
the Care Inspectorate will be published online.
Complete
A review of workforce and succession plans is underway to ensure the plans take cognisance
of future needs. 
Complete 
Best Value Assurance Report
A new approach to auditing Best Value has been introduced by the Accounts Commission. This work is now
integrated into annual audit reporting from 2023/24 to build local audit knowledge and reduce the scrutiny burden on
councils.  External audit also conduct thematic reviews as directed by the Accounts Commission.   
For 2023/24 this work focused on Workforce Innovation.  The Council’s appointed external auditors completed their
work in this during 2023/24 with a report presented to Audit Committee in September 2024.  The overall conclusion
was that “Council’s workforce planning strategy is aligned with its strategic plan and supports the “our Council is
inclusive and adaptable” strategic priority. The Council could make better use of data available at organisation and
service level, and through the workforce planning console, to identify future resource needs and improve succession
planning.” 
Page 146

Page 35

Page 23
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2024/25
Health and Social Care Integration
The Council, as the funder of the Social Care services within the West Dunbartonshire Health and Social Care
Partnership (HSCP) has an interest in the governance arrangements within the HSCP Board. Internal Audit
arrangements for the HSCP is provided jointly by the Council’s Internal Audit service and the Health Board’s Internal
Audit Service, with the Council’s Internal Audit service providing audit arrangements for social care services and the
general oversight of the HSCP Board’s governance arrangements. 
The HSCP Board has arrangements in place to review its own ongoing compliance with the revised Code of
Governance. Due to the Council’s role as social care service provider Internal Audit’s process outcomes on such
services are reported to the Council’s Audit Committee as well as that of the HSCP Board. The Chief Social Worker
provides the Council with an annual report on the performance of the HSCP. 
The financial arrangements for the Council’s funding to the HSCP Board are aligned and budget processes run
parallel to ensure that appropriate budgets for the HSCP Board are aligned with Council policy and budgeting
approaches. On an ongoing basis the Council continues to receive budgetary control information in relation to HSCP
Board services funded by the Council. 
Compliance with Best Practice
Statement on the role of the Chief Financial Officer in local government
The Council complies with the requirements of the CIPFA Statement on “The Role of the Chief Financial Officer in
Local Government 2010”. The Council’s Chief Financial Officer (Section 95 Officer) has overall responsibility for the
Council’s financial arrangements and is professionally qualified and suitably experienced to lead the Council’s finance
function and to direct finance staff. 
Statement on the role of the Head of Internal Audit in Public Service Organisations
The Council complies with the requirements of the CIPFA Statement on “The Role of the Head of Internal Audit in
Public Service Organisations 2019”. The Council’s Chief Internal Auditor has responsibility for the Council’s Internal
Audit function and is professionally qualified and suitably experienced to lead and direct the Council’s Internal Audit
staff. The Internal Audit service generally operates in accordance with the CIPFA “Public Sector Internal Audit
Standards 2017”. 
Assurance
Subject to the above, and on the basis of the assurances provided, we consider the governance and internal control
environment operating during 2024/25 provides reasonable and objective assurance that any significant risks
impacting on the achievement of our principle objectives will be identified, and actions taken to avoid or mitigate their
impact. Systems are in place to continually review and improve the governance and internal control environment with
plans in place to address improvement areas.
.
Martin Rooney   Peter Hessett   Laurence Slavin
Leader of the Council  Chief Executive  Chief Officer – Resources
Date:    Date:    Date: 
Page 147

Page 36

Page 24
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25
Remuneration Report
Introduction
The Council is required under statute to provide information on the remuneration of each senior elected member and
senior officer and any other officer not otherwise included whose remuneration is over £0.150m per annum. All
information disclosed in the tables 1-8 of the Remuneration Report is subject to audit. The other sections are reviewed
by external audit to ensure that they are consistent with the Financial Statements. 
Remuneration – Councillors
The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004 (Remuneration) Amendment
Regulations 2025 (SSI No. 2025-04-01). The Regulations provide for the grading of Councillors for the purposes of
remuneration arrangements, as the Leader of the Council, the Civic Head (Provost), Senior Councillors and Councillors.
The Leader of the Council and the Provost cannot be the same person for the purposes of payment of remuneration. A
Senior Councillor is a Councillor who holds a significant position of responsibility in the Council’s political management
structure. The regulations stipulate that in addition to the Leader of the Council and the Provost, the Council can appoint
a maximum of ten Senior Councillors. The level of remuneration paid to the Leader of the Council, Provost and Senior
Councillors is detailed in Table 1.
The salary to be paid to the Leader of the Council is set out in the Regulations. For 2024/25 the salary for the Leader of
the Council was £41,962. The Regulations also state that the maximum yearly amount that may be paid to the Provost
(£31,472) is 75% of the total yearly amount payable to the Leader of the Council. 
The Regulations also state the remuneration that may be paid to Senior Councillors and the total number of Senior
Councillors the Council may have. The maximum yearly amount that may be paid to a Senior Councillor (£31,472) is
75% of the total yearly amount payable to the Leader of the Council. For 2024/25 the total yearly amount payable by
the Council for remuneration of all of its Senior Councillors shall not exceed £251,920. The Council is able to exercise
local flexibility in the determination of the precise number of Senior Councillors and their salary within these maximum
limits. Council policy is to pay Senior Councillors a salary of £25,192, per the decision at Council on 18 May 2022 for
2022/2023 onwards.
During 2022/23, the Council agreed the appointment of a Council Leader, Provost and 10 Senior Councillors and the
remuneration due to be paid to the 10 Senior Councillors for a full year in 2024/25 will total £244,670 (£244,670 in
2022/23 for those Senior Councillors). The Regulations also permit the Council to pay contributions or other payments
as required to the Local Government Pension Scheme in respect of those Councillors who elect to become Councillor
members of the pension scheme. The pension entitlements for the year to 31 March 2025 are shown in Table 5 on
pages 28.
The Scheme of Members Allowances which encompasses the salaries of all elected members including the Leader,
Provost and Senior Councillors was agreed at a meeting of the full Council on 25 September 2024. The report to Council
can be found at appointment of councillors and the Register of Members Allowances can be found at : Councillors
Allowances  
Page 148

Page 37

Page 25
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25 
Table 1: Remuneration of Senior Councillor
2023/24
Total
Remuneration Senior Members Responsibility
Salary,
Fees & 
Allowances
Taxable
Expenses
Total
Remuneration
£ £ £ £
40,205 Martin Rooney Leader of Council 41,962 0 41,962
Convener of Recruitment & Individual Performance
Management Committee Convener of Community Planning West Dunbartonshire 
Convenor Corporate Services Committee from 25/9/24 until
14/12/24
30,154 Douglas McAllisterProvost until 28/8/24 10,675 0 10,675
25,192 Karen Conaghan Leader of the Opposition until 28/8/24 29,857 0 29,857
Convener of Audit  Committee until 16/9/24
Provost from 28/8/2024
25,292 Gurpreet Singh JohalConvener of Appeals Committee until 20/8/24 26,494 0 26,494
Convener of Housing & Communities Committee
25,192 Daniel Lennie Convener of Corporate Services Committee until 25/9/24 23,577 0 23,577
25,128 David McBride Convener of Infrastructure Regeneration & Economic Dev
Committee
26,502 0 26,502
Depute Leader from 25/9/24
Convener of Joint Consultative Forum
25,192 Michelle McGinty Depute Leader until 25/9/24 23,753 0 23,753
Convener of West Dunbartonshire Health & Social Care
Partnership Board (IJB) until 28/6/24
25,128 John Millar Depute Provost until 25/9/2024 26,686 0 26,686
Convener of Tendering Committee
25,128 Lawrence O'Neill Convener of Planning Committee
Convener of Licensing Committee
26,502 0 26,502
25,192 Clare Steel Convener of Educational Services Committee 26,494 0 26,494
20,150 Hazel Sorrell Depute Provest from 25/9/24 24,094 0 24,094
20,150 Gordon Scanlon Leader of the Opposition from 28/8/24 24,463 0 24,463
Convenor of Audit Committee from 16/9/24
0 Fiona Hennebry Convener of West Dunbartonshire Health & Social Care
Partnership until 28/6/24 Board (IJB) from 28/6/2024
19,766 0 19,766
Convener of Appeals Committee from 21/8/2024
0 William Rooney Convenor of Corporate Serices from 14/12/24 8,659 0 8,659
Year ended 31 March 2025
Note: The term Senior Councillor means a Leader of the Council, the Civic Head or a Senior Councillor, all as defined by regulation 2 of the Local
Governance (Scotland) Act 2004 (Remuneration) Regulations 2007(3).
Salaries, allowances and expenses in 2024/25 have only been included for Senior Councillors. 
Senior Councillors’ remuneration in the tables above does not include non-taxable expenses. The values in the table
above relate to the actual payments made during 2024/25 which differ slightly from those stated on page 28 due to
timing differences in regards to payroll. There is no compensation/loss of office payments within the period and there
were no benefits or bonuses paid during the year.
Councillors’ remuneration
Councillors’ payments are made in accordance with the Local Governance (Scotland) Act 2004 (Remuneration)
Regulations 2007 and The Local Government (Allowances and Expenses) (Scotland) Regulations 2007. 
The total amount of councillors’ remuneration paid by the Council during the year was: 
Table 2: Councillors Total Remuneration
2023/24 Members Allowance 2024/25
£ £
517,724 Salaries 532,219
8,125 Expenses 10,084
525,849 Total Allowances 542,303
Page 149

Page 38

Page 26
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25
The annual return of councillors’ salaries and expenses for 2024-25 is available for any member of the public to view at
all Council libraries and public offices during normal working hours. It is also available on the Council’s website at: :
Councillors Allowances.
Remuneration - Senior Employees and senior Employees of Subsidiaries
The salary of senior employees is set by reference to national arrangements. The Scottish Joint Negotiating Committee
(SJNC) for Local Authority Services sets the salaries for the Chief Executives of Scottish local authorities. Circular IR
10-24b sets the amount of salary for the Chief Officials of the Council for the period 1 April 2024 to 31 March 2025. The
post of Chief Officer Health and Social Care Partnership is a joint post between the Council and NHS Greater Glasgow
and Clyde. 
Details of the post of Chief Officer HSCP are included in the remuneration report of the Integration Joint Board. The
Council funds 50% of this post and NHS Greater Glasgow fund the remaining 50%.
The only benefits received by employees are, salary, employer contributions to the pension fund and, where applicable,
payment for election duties. There were no bonuses, compensation for loss of office or other benefits paid to senior
employees during the year. The remuneration details for senior employees are noted in Table 3. 
Table 3: Senior Officers Remuneration
Total
Remuneration
2023/24 Name Position at 31 March 2024
Salary, Fees &
Allowances
2023/24
*Election
Duties
Total
Remuneration
2024/25
£ £ £ £
144,584 Peter Hessett Chief Executive 153,875 4,022 157,897
99,581 Lesley James Head of Children’s Healthcare & Criminal
Justice - Chief Social Work Officer
102,670 0 102,670
107,647 Laura Mason Chief Officer - Education, Learning &
Attainment
111,522 360 111,882
108,197 Laurence Slavin Chief Officer - Resources - S95 Officer 111,564 520 112,084
105,887 Alan Douglas Chief Officer - Regulatory & Regeneration 111,564 1,888 113,452
108,216 Victoria Rogers Chief Officer - People & Technology 111,564 0 111,564
95,932 Gail MacFarlane Chief Officer - Roads & Neighbourhood  (
Shared post with Inverclyde until 1 june
2023, then 100% WDC)
111,564 0 111,564
108,216 Peter Barry Chief Officer - Housing & Employability 111,564 0 111,564
108,197 Amanda Graham Chief Officer - Citizen, Culture & Facilities 111,564 0 111,564
86,716 John Anderson General Manager of West Dunbartonshire
Leisure
89,596 641 90,237
Remuneration of Senior Employees of Subsidairies
Remuneration of Senior Employees 
*Note: Election payments for 2024/25 are for the General elections held on the 4 July 2024. 
Details of the post of Chief Officer HSCP are included in the remuneration report of the Integration Joint Board. 
Remuneration of Employees receiving more than £50,000
Council employees receiving more than £50,000 remuneration for the year were paid the amounts summarised in Table
4. In accordance with the disclosure requirement of the Regulations, the information in Table 4 shows the number of
employees in bands of £5,000. This information includes the senior employees who are subject to the fuller disclosure
requirements in the tables above.
Page 150

Page 39

Page 27
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25 
Table 4: Remuneration of Officers receiving more than £50,000
2023/24 2024/25
Number of Officers Number of Officers
166 £50,000 -   £54,999 211
121 £55,000 -   £59,999 73
56 £60,000 -   £64,999 89
42 £65,000 -   £69,999 54
29 £70,000 -   £74,999 30
35 £75,000 -   £79,999 41
9 £80,000 -   £84,999 15
2 £85,000 -   £89,999 1
2 £90,000 -   £94,999 2
6 £95,000 -   £99,999 1
0 £100,000 - £104,999 5
7 £105,000 - £109,999 1
0 £110,000 - £114,999 8
0 £115,000 - £119,999 0
0 £120,000 - £124,999 1
1 £130,000 - £134,999 0
0 £135,000 - £139,999 1
1 £140,000 - £144,999 0
0 £145,000-£149,500 0
0 £150,000-£154,999 0
0 £155,000-£159,999 1
477 Total 534
Range
Pension Benefits
Pension benefits for Councillors and most local government employees are provided through the Local Government
Pension Scheme (LGPS). Councillors’ pension benefits are based on career average pay. The Councillor’s pay for each
year or part year ending 31 March (other than the pay in the final year commencing 1 April) is increased by the increase
in the cost of living, as measured by the appropriate index (or indices) between the end of that year and the last day of
the month in which their membership of the scheme ends. The total of the revalued pay is then divided by the period of
membership to calculate the career average pay. This is the value used to calculate the pension benefits.  Table 5
details the pension entitlement and contributions made by the Council in respect of all senior Councillors and senior
officers of the Council who have opted to join the LGPS.   
For local government employees, the LGPS 2015 is a career average pension scheme. This means that pension
benefits from 01/04/2015 are based on pensionable pay with inflation added. Pension is accrued at a rate of 1/49 of
pensionable pay for each scheme year. Pension benefits can be accessed from age 55 but are reduced prior to 60th
birthday. Pension benefits accrued before 1 April 2015 are protected and are based on final pay on retiring.
Pension benefits for teachers are provided through Scottish Teachers Superannuation Scheme (STSS). The STSS is a
contributory scheme administered by the Scottish Public Pension Agency (SPPA). From 1 April 2015 the scheme is a
career average pension scheme. Pension benefits are increased in line with inflation. Pension is accrued at 1/57 of
pensionable earnings each year. Pension benefits can be accessed earlier than the normal state pension age but will
be reduced if taken earlier than the normal pension age (state pension age).
From 1 April 2009, a five-tier contribution system was introduced with contributions from scheme members being based
on how much pay falls into each tier. This is designed to give more equality between the cost and benefits of scheme
membership. Table 5 provides information on these tiered contribution rates. 
Page 151

Page 40

Page 28
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25
Table 5: Pension Contribution Rates
Contribution
rate 2023/24
Contribution
rate 2024/25
The tiers and members contribution rates for 2024/25 (2023/24) whole time pay:
Local Government employees
5.50% On earnings up to and including £27,000 (£25,300) 5.50%
7.25% On earnings above £xx,xxx (£27,001) and up to £33,000 (£31,000) 7.25%
8.50% On earnings above £xx,xxx (£33,001) and up to £45,300 (£42,500) 8.50%
9.50% On earnings above £xx,xxx (£45,301) and up to £60,400 (£56,600) 9.50%
12.00% On earnings above £xx,xxx (£60,401) 12.00%
The tiers and members contribution rates for 2024/25 (2023/24) actual pay:
Teachers
7.20% On earnings up to and including £34,286 (£29,186) 7.35%
8.70% On earnings above £34,287 (£29,186) and up to £46,155 (£39,289) 8.88%
9.70% On earnings above £46,156 (£39,289)  and up to £54,728 (£46,586) 9.90%
10.40% On earnings above £54,729 (£46,586)  and up to £67,975 (£61,740) 10.61%
11.50% On earnings above £67,976 (£61,740)  and up to £92,693 (£84,190) 11.73%
11.90% On earnings above £92,694 (£84,190) 12.14%
If a person works part-time their contribution rate is worked out on the whole-time pay rate for the job, with actual
contributions paid on actual pay earned. There is no automatic entitlement to a lump sum. Members may opt to give up
(commute) pension for lump sum up to the limit set by the Finance Act 2004. The accrual rate guarantees a pension
based on 1/49th of pay from 1 April 2015. Prior to this the accrual rate guarantees a pension based on 1/60th of final
pensionable salary and years of pensionable service. Prior to 2009 the accrual rate guaranteed a pension based on
1/80th and a lump sum based on 3/80th of final pensionable salary and years of pensionable service. 
The value of the accrued benefits has been calculated on the basis of the age at which the person will first become
entitled to receive a pension on retirement without reduction on account of its payment at that age; without exercising
any option to commute pension entitlement into a lump sum; and without any adjustment for the effects of future inflation.
You can retire and receive your benefits in full from your normal pension age. The normal pension age is 65 for any
benefits built up before 1 April 2015. For pension build up from 1 April 2015, the Normal Pension Age is not fixed at age
65 but, instead, is the same as the State Pension Age (but with a minimum of age 65).
The value of benefits Table 6 has been provided by the Strathclyde Pension Fund Office and is calculated on the basis
of the age at which the person will first become entitled to a full pension on retirement without reduction on account of
its payment at that date: without exercising any option to commute pension entitlement into a lump sum: and without
any adjustment for the effects of future inflation. The pension figures shown relate to the benefits that the person has
accrued as a consequence of their total Local Government service, and not just their current appointment. 
The pension figures shown relate to the benefits that the person has accrued as a consequence of their total public
sector service, and not just their current appointment.  The pension entitlements for the year to 31 March 2025 together
with the contribution made by the Council to each person’s pension during the year is shown in Table 6 for Senior
Councillors and Table 7 for Senior Officers. The tables contain information for those persons who were Senior Officers
or Senior Councillors in 2024/25.  Senior councillors omitted from the table above are not members of the Local
Government Pension Scheme.
Page 152

Page 41

Page 29
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25
Table 6: Pension Benefits for Senior Councillors
Name Position at 31/03/25 For year
to 31
March
2025
For year
to 31
March
2024
As at 31
March
2025
Difference
from 31
March 2024
Senior Councillors £ £ £ £
Martin Rooney Leader of Council 2,728 7,760 14,699 1,086
Convener of Recruitment & Individual Performance Management
Committee 
Convenor Corporate Services Committee from 25/9/24 until 14/12/24
Convener of Community Planning West Dunbartonshire Management
Board Douglas McAllister Provost until 28/8/24 693 5,820 3,700 273
Karen Conaghan Leader of the Opposition 1,941 4,862 4,476 649
Convener of Audit & Performance Review Committee
Provost from 28/8/24
Gurpreet Singh Johal Convener of Appeals Committee until 20/8/24 1,722 4,862 1,611 646
Convener of Housing & Communities Committee
Daniel Lennie Convener of Corporate Services Committee until 25/9/24 1,533 4,862 3,792 522
David McBride Convener of Infrastructure Regeneration & Economic Dev Committee 1,723 4,850 10,953 652
Depute Leader from 25/9/24
Convener of Joint Consultative Forum
Michelle McGinty Depute Leader until 25/9/24 1,544 4,850 4,850 1621
Convener of West Dunbartonshire Health & Social Care Partnership
Board (IJB) until 28/6/24
John Millar Depute Provost until 25/9/24 1,735 4,850 3,819 910
Convenor of Tendering Committee
Lawrence O'Neill Convener of Licensing Committee 1,723 4,850 5,549 868            
Convener of Planning Committee
Clare Steel Convener of Educational Services Committee 1,722     4,862     1,611     646            
Hazel Sorrell Depute Provest from 25/9/2024 1,566     3,889     1,353     576            
Gordon Scanlon Leader of the Opposition from 28/8/24 1,590     3,889     1,361     584            
Convenor of Audit Committee from 16/9/24
Fiona Hennebry Convenor of the Appeals Committee from 21/8/24 357        -        -        -             
Convener of West Dunbartonshire Health & Social Care Partnership
Board (IJB) from 28/6/24
William Rooney Convener of Corporate Services Committee from 14/12/24 563 0 175 175
In-year pension
contributions
Accrued pension
benefits
Table 7 Pension Benefits for Senior Officers
Name Position at 31/03/25 For year to
31 March
2025
For year
to 31
March
2024
As at 31
March
2025
Difference
from 31
March 2024
£ £ £ £
Peter Hessett Chief Executive 10,002 27,905 161,424 11,485
Lesley James Head of Children’s Healthcare & Criminal Justice -
Chief Social Work Officer
6,674 19,219 89,878 4,358
Laura Mason Chief Officer - Education, Learning & Attainment 7,249 20,776 170,058 6,801
Laurence Slavin Chief Officer - Resources - S95 Officer 7,252 20,882 50,992 4,546
Alan Douglas Chief Officer - Regulatory & Regeneration 7,252 20,436 132,897 10,458
Gail MacFarlane Chief Officer - Roads & Neighbourhood 7,252 16,945 30,352 0
Victoria Rogers Chief Officer - People & Technology 7,252 20,886   92,009   4,486
Peter Barry Chief Officer - Housing & Employability 7,252 20,886   77,633   4,064          
Amanda Graham Chief Officer - Citizen, Culture & Facilities 7,252 20,882   19,313   3,442          
Senior Employees of Subsidiaries
John Anderson General Manager of West Dunbartonshire Leisure 5,824            16,736   75,290   4,996          
In-year pension
contributions
Accrued pension
benefits
Senior Employees
Page 153

Page 42

Page 30
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25 
Exit Packages
The number of exit packages with cost per band for compulsory and other redundancies are detailed in Table 8. The
Council only agrees exit packages where they are consistent with wider workforce planning and service delivery
objectives; and where the savings accruing from an individual ceasing employment with the Council exceed the costs
of the exit package within an acceptable period.
For the purposes of this note Exit Packages include:
• Redundancy payment. 
• Strain on the fund cost (the amount which the Council is required to pay to the pension fund because the
employee has retired before the assumed retirement age).
• Added Years Lump Sum (the amount which the Council pays to the individual in a one-off lump sum, according
to the compensatory added years awarded – maximum three years). 
Table 8: Exit Packages
Departures Total Cost (£) Departures Total Cost (£)
32 324,850 £0  -  £20,000 22 111,376               
9 254,268 £20,001-£40,000 8 213,868               
4 200,616 £40,001-£60,000 4 211,140               
6 407,109 £60,001-£80,000 2 142,066               
4 357,891 £80,001-£100,000 5 437,759               
4 458,654 £100,001  - £150,000 2 239,662               
0 0 £150,001- £200,000 2 351,503               
59 2,003,388 Total 45 1,707,374
2024-252023-24
Banding
Termination Benefits of Employees 
Termination benefits are amounts payable as a result of a decision by the Council to terminate an officer’s employment
before their normal retirement date or an officer’s decision to accept voluntary redundancy in exchange for those
benefits. They are charged on an accruals basis to the appropriate service line in the CIES at the earlier of when the
Council can no longer withdraw the offer of those benefits or when the Council recognises the costs for a restructuring.
The Council terminated the contracts of a number of employees in 2024/25. The above table includes £1.324 million
liabilities relating to these releases (2023/24: £0.060m). 
Martin Rooney        Peter Hessett
Leader of the Council       Chief Executive
Date: 18 June 2025        Date: 18 June 2025 
Page 154

Page 43

Page 31
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2024/25 
Trade Union Facility Time (Unaudited)
Facility time generates benefits for employees, managers and the wider community from effective joint working between
union representatives and employers.
Details of the facility time within the Council during the year to 31 March 2025 is shown in Table 9 below. Further detail
can be found at:
https://www.west-dunbarton.gov.uk/council/performance-and-spending/trade-union-facility-time-reports/  
Table 9: Trade Union Facility Time
Number of
Employees
FTE employee
Number
Number of
Employees
FTE employee
Number
34 28 41 36
Percentage Number of
Employees Percentage Number of
Employees
Less < 1% 26 Less < 1% 10
1-50% 6 1-50% 28
51%-99% 1 51%-99% 1
100% 1 100% 2
Education Function Employee All Other Function Employee
Percentage of Time Spent on Percentage of Time Spent on Facility
Total cost of facility time Total cost of facility time
£72,033 £123,686
Total pay bill Total pay bill
£64,641,431 £86,345,018
0.24% 1.15%
Percentage of Pay Bill Spent on
Facility Time
Percentage of Pay Bill Spent on facility
Time
0.110% 0.140%
Paid TU Activities Paid TU Activities
Page 155

Page 44

Page 32
Comprehensive Income and Expenditure Statement                                             
West Dunbartonshire Council Annual Accounts 2024/25
Comprehensive Income and Expenditure Statement 
This statement shows the accounting cost in year, of providing services in accordance with relevant International Financial Reporting Standards, rather than the amount to be
funded from taxation. The Council raises taxation to cover expenditure in accordance with regulations; this may be different from the accounting cost. The taxation position is
shown in the Movement in Reserves Statement and the Expenditure and Funding Analysis. 
2023/24 2023/24 2023/24 2024/25 2024/25 2024/25
Gross Gross Net Gross Gross Net
Expenditure Income Expenditure Expenditure Income Expenditure
£'000 £'000 £'000 Note £'000 £'000 £'000
Service
43,254 (40,116) 3,138 Resources 41,150 (35,441) 5,709
9,845 (2,227) 7,618 Regulatory and Regeneration 10,550 (1,418) 9,132
12,350 (196) 12,154 People & Technology 12,585 (61) 12,524
15,175 (698) 14,477 Citizens, Culture and Facilities 15,785 (55) 15,730
146,913 (21,487) 125,426 Education, Learning and Attainment 145,576 (9,998) 135,578
30,849 (3,155) 27,694 Roads and Neighbourhood 30,126 (3,911) 26,215
12,646 (8,004) 4,642 Housing and Employability 14,467 (9,190) 5,277
(1,272) (441) (1,713) Miscellaneous Services (2,560) (3,106) (5,666)
211,440 (124,699) 86,741 Health and Social Care Partnership 221,935 (126,125) 95,810
2,401 0 2,401 Requisitions 2,406 0 2,406
44,646 (49,303) (4,657) Housing Revenue Account 41,960 (53,019) (11,059)
528,247 (250,326) 277,921 Net Cost of Service 533,980 (242,324) 291,656
160 Other Operating Expenditure and (income) - (Gain) / loss on Disposal of
non-current assets
1,999
29,646 Financing and Investment (Income) and Expenditure 8 44,287
(298,070) Taxation and Non-specific Grant Income 9 (312,167)
9,657 (Surplus)/Deficit on Provision of Services 25,775
(8,131) (Surplus)/Deficit arising from revaluation of non-current assets 11 (8,560)
0 (Surplus)/Deficit on revaluation of assets held at fair value through
other comprehensive income
0
32,951 Remeasurement of the net defined benefit pension liability 22 (20,752)
24,820 Other Comprehensive (Income) and Expenditure (29,312)
34,477 Total Comprehensive (Income) and Expenditure (3,537)
Page 156

Page 45

Page 33
Balance Sheet                                                           
West Dunbartonshire Council Annual Accounts 2024/25
Balance Sheet
The balance sheet shows the value, as at the balance sheet date, of the assets and liabilities recognised by the Council.
The net assets of the Council (assets less liabilities) are matched by the reserves held by the Council. Reserves are
reported in two categories:  
1. Usable reserves - reserves the Council may use to provide services, subject to the need to maintain a prudent level
of reserves and any statutory limitations on their use (for example the capital receipts that may only be used to
fund capital expenditure or repay debt).
2. Unusable reserves - reserves that the Council is not able to use to provide services. This category of reserves
includes reserves holding unrealised gains and losses (for example the revaluation reserve), where amounts would
only become available to provide services if the assets are sold; and reserves that hold timing differences shown
in the MIRS line ‘adjustments between accounting basis and funding basis under regulations. 
31 March 2024 Balance Sheet 31 March 2025
£'000 Note £'000
1,187,073 Property, Plant and Equipment 11 1,279,408
942 Intangible Assets 12 1,256
1,773 Long Term Debtors 2,022
1,524 Heritage Assets 13 1,524
483 Long Term Investments 470
1,191,795 Long Term Assets 1,284,680
2,743 Asset Held for Sale 14 1,144
1,298 Inventories 1,167
73,977 Short Term Debtors 17 67,487
24,397 Cash and Cash Equivalents (net) 18 8,227
102,415 Current Assets 78,025
(64,367) Short Term Creditors 19 (62,349)
(2,637) Provisions 20 (650)
(3,590) PPP 15 (4,346)
(314,331) Short Term Borrowing 21 (334,602)
(384,925) Current Liabilities (401,947)
(82,853) PPP and Finance Lease Liabilities 15 (78,508)
(414,301) Long Term Borrowing 21 (469,167)
(43,012) Net Pensions Liability 22 (37,416)
(5,317) Capital Grants Receipts in Advance (8,328)
(545,483) Long Term Liabilities (593,419)
363,802 Net Assets 367,339
Represented by:
(16,747) Usable Reserves MIR/6 (13,316)
(347,055) Unusable Reserves MIR/6 (354,023)
(363,802) Total Reserves (367,339)
The unaudited annual accounts were issued on 18 June 2025.
Page 157

Page 46

Page 34
Movement in Reserves Statement                                                                           
West Dunbartonshire Council Annual Accounts 2024/25
Movement in Reserves Statement
This statement shows the movement in the year on the different reserves held by the Council, analysed into ‘usable reserves’ (i.e. those that can be applied to fund expenditure
or reduce local taxation) and other reserves. The surplus or (deficit) on the provision of services line in the Comprehensive Income and Expenditure Statement (page 32) shows
the true economic cost of providing the Council’s services. These are different from the statutory amounts required to be charged to the General Fund balance and the Housing
Revenue Account for council tax setting and dwelling rent setting purposes. The net increase/decrease before transfer to other statutory reserves line shows the statutory
general fund balance and housing revenue account balance before any discretionary transfers to or from earmarked reserves undertaken by the Council. 
General
Fund
balance
HRA
Balance
Capital
Grants and
Receipts
Unapplied
Account
Capital
Reserve
Capital
Fund
Other
Reserves
Total Usable
Reserves
Unusable
Reserves
Total
Reserves
£000 £000 £000 £000 £000 £000 £000 £000 £000
2024/25 0
Balance at 31 March 2024 Carried Forward (15,371) (969) (213) 0 0 (194) (16,747) (347,055) (363,802)
Movement in Reserve 2024/25
Total Comprehensive Expenditure and Income 27,494 (1,719) 25,775 (29,312) (3,537)
Adjustments between accounting basis and funding basis under
regulations (Note 6) (22,928) 2,077 (1,493) (22,344) 22,344                         0
Net (Increase)/Decrease before Transfers to Other
Statutory Reserves 4,566 358 (1,493) 0 0 0 3,431 (6,968) (3,537)
Transfers to/from other statutory reserves (1,658) 0 1,706 (48) 0
Closing Balance at 31 March 2025 (12,463) (611) 0 0 0 (242) (13,316) (354,023) (367,339)
2023/24
Balance at 31 March 2023 Carried Forward (31,542) (2,635) (72) 0 0 (262) (34,511) (363,766) (398,277)
Adjustment to the statutory repayment of debt for service
concession arrangements - permitted flexability*
Opening Balance at 1 April 2023 (31,542) (2,635) (72) 0 0 (262) (34,511) (363,766) (398,277)
Movement in Reserve 2023/24
Total Comprehensive Expenditure and Income 13,570 (3,913) 0 0 0 0 9,657 24,820 34,477
Adjustments between accounting basis and funding basis under
regulations (Note 6) 5,610 5,579 (3,082) 0 0 0 8,107 (8,107) 0
Net (Increase)/Decrease before Transfers to Other
Statutory Reserves 19,180 1,666 (3,082) 0 0 0 17,764 16,713 34,477
Transfers to/from other statutory reserves (3,009) 2,941 68 0
Increase/Decrease in Year 16,171 1,666 (141) 0 0 68 17,764 16,713 34,477
Closing Balance at 31 March 2024 (15,371) (969) (213) 0 0 (194) (16,747) (347,053) (363,800)
Usable Reserves
Page 158

Page 47

Page 35
Cashflow Statement     
West Dunbartonshire Council Annual Accounts 2024/25
Cash Flow Statement
The cash flow statement shows the changes in cash and cash equivalents of the Council during the reporting period.
The statement shows how the Council generates and uses cash and cash equivalents by classifying cash flows as
operating, investing and financing activities. The amount of net cash flows arising from operating activities is a key
indicator of the extent to which the operations of the Council are funded by way of taxation and grant income or from
the recipients of services provided by the Council. Investing activities represent the extent to which cash outflows have
been made for resources which are intended to contribute to the Council’s future service delivery. Cash flows arising
from financing activities are useful in predicting claims on future cash flows by providers of capital (i.e. borrowing) to the
Council.
2023/24 Cashflow Statement 2024/25 2024/25
£'000 £'000 £'000
Operating Activities
9,657 Net deficit on the provision of services 25,775
(39,038) Depreciation, amortisation and impairment (36,253)
(160) Net gain/loss on fixed assets (1,999)
5,329 Movement in pension liabilities (15,156)
(39) Movement in inventories (131)
13,631 Movement in debtors (6,241)
12,466 Movement in creditors and provisions 4,005
0 Other non-cash movements (856)
(7,811)
Adjustments to net deficit on the provision of services
for non-cash movements (56,631)
(2,000) Financing movements (12)
35,796 Investing movements 21,249
33,796
Adjustments for items included in the net surplus/deficit
on the provision of services that are investing and
financing activities 21,237
35,642 Net cash (inflow)/outflow from Operating Activities (9,619)
87,221 Purchase of property, plant and equipment and intangible assets 122,234
(2,911) Proceeds from sale of property, plant and equipment and intangible assets (1,493)
11 Movement on long term investments 0
(35,796) Other receipts from investing activities (21,249)
48,525 Net cash (inflow)/outflow from investing activities 99,492
(518,000) Cash receipts of short-term and long-term borrowing (457,744)
2,673 Repayment of PPP liabilities 3,590
409,314 Repayment of short-term and long-term borrowing 380,451
(106,013) Financing Activities (73,703)
(21,846) Net cash (inflow)/outflow from financing activities 16,170
2,551
Cash and cash equivalents at the beginning of the
reporting period 24,397
24,397
Cash and cash equivalents at the end of the reporting
period 8,227
(21,846) Movement – (Increase)/ Decrease in Cash 16,170
Reconciliation of Liabilities arising from Financing Activities
31 March 2024
Financing
Cash flows
Non-cash adj
to FIAA 31 March 2025
£'000 £'000 £'000 £'000
Long term Borrowing 460,953 8,214 0 469,167
Short term Borrowing 267,598 67,034 (30) 334,602
PPP Liability 86,442 (3,590) 82,852
814,993                      71,658           (30) 886,621                       
Page 159

Page 48

Page 36
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 1 - Accounting Policies
1.1  General Principles
The Financial Statements summarises the Council’s transactions for the 2024/25 financial year and its position at the
year end of 31 March 2025. The Council is required to prepare an Annual Statement of Accounts by the Local Authority
Accounts (Scotland) Regulations 2014. Section 12 of the Local Government in Scotland Act 2003 requires they be
prepared in accordance with proper accounting practices. These practices primarily comprise the Code of Practice on
Local Authority Accounting in the United Kingdom 2024/25 (“the code”) supported by International Financial Reporting
Standards (IFRS). 
The accounting convention adopted in the Financial Statements is principally historic cost, modified by the revaluation
of certain categories of non-current assets and financial instruments. The convention also adopts the assumption that
the Council will continue as a going concern for the foreseeable future. 
1.2 Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when payment is made or received. In particular: 
• Revenue from contracts with service recipients, whether for services or the provision of goods, is recognised when
(or as) the goods or services are transferred to the service recipient in accordance with the performance obligations
in the contract.
• Expenses in relation to services received are recorded as expenditure when the services are received, rather than
when payment is made.
• Supplies are recorded as expenditure when they are consumed. Where there is a gap between the date supplies
are received and their consumption their value is carried as inventories on the Balance Sheet.
• Interest payable on borrowings and receivable on investments is accounted for respectively as expenditure and
income on the basis of the effective interest rate for the relevant financial instrument, rather than on cash flows
fixed or determined by the contract.
• When income and expenditure have been recognised but cash has not been received or paid, a debtor or creditor
for the relevant amount is recorded in the Balance Sheet. Where there is evidence that debts are unlikely to be
settled, the balance of debtors is written down and charged to revenue for the income that might not be collected 
1.3 Changes in Accounting Policies, Estimates and Errors
Changes in accounting policies are only made when required by proper accounting practices or the change provides
more reliable or relevant information about the effect of transactions, events or conditions on the Council’s financial
position or performance. Where a change is made, it is applied retrospectively by adjusting opening balances and
comparative figures, as if the new policy has always been applied. 
Changes in accounting estimates are accounted for prospectively, i.e. in the current and future years only. 
Material errors discovered in prior period figures are corrected retrospectively by amending opening balances and
comparative figures. 
1.4 Charges to Revenue for Property, Plant and Equipment
Council Services are debited/credited with the following amounts to record the cost of using or holding fixed assets
during the year: 
• depreciation, attributable to the assets used by the relevant service or trading account
• revaluation and impairment losses, where there is no accumulated gain in the Revaluation Reserve
• revaluation gains, where these reverse an impairment loss previously charged to the service or trading account
• amortisation of intangible fixed assets. 
The Council is not required to raise council tax to cover depreciation, revaluation gains or losses or impairment losses.
However, it is required to make annual provision from revenue towards the reduction in its overall borrowing requirement.
Depreciation, revaluation and impairment losses and amortisations are replaced by the revenue provision in the General
Page 160

Page 49

Page 37
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Fund by an adjustment within the Capital Adjustment Account in the Movement in Reserves Statement for the difference
between the two. 
1.5  Intangible assets
Internally generated assets are capitalised where it is demonstrable the project is technically feasible and is intended to
be completed (with adequate resources being available) and the Council will be able to generate future economic
benefits or deliver service potential by being able to sell or use the asset. Expenditure is capitalised where it can be
measured reliably as attributable to the asset and restricted to that incurred during the development phase (research
expenditure is not capitalised). 
Expenditure on the development of websites is not capitalised if the website is solely or primarily intended to promote
or advertise the Council’s goods or services. 
Assets are measured originally at cost and only revalued where the fair value of the asset can be determined by
reference to an active market. 
Where an intangible asset has a finite useful life, the depreciable amount of the asset is charged over its useful life to
the relevant service line(s) in the Comprehensive Income and Expenditure Statement. An asset is tested for impairment
whenever there is an indication that the asset might be impaired – any losses recognised are posted to the relevant
service line(s) in the Comprehensive Income and Expenditure Statement. Any gain or loss arising on the disposal or
abandonment of an intangible asset is recognised in the Surplus or Deficit on the Provision of Services when the asset
is derecognised. 
1.6 Property, Plant and Equipment
Assets that have physical substance and are held for the supply of goods and services, either directly or indirectly, and
that are expected to be used during more than one financial year are classified as Property, Plant and Equipment. 
1.6.1 Recognition
Expenditure on the acquisition, creation or enhancement of property, plant and equipment is capitalised on an accrual’s
basis, provided it is probable the future economic benefits or service potential associated with the item will flow to the
Council and the cost of the asset can be measured reliably. Expenditure that maintains but does not add to the asset’s
potential to deliver future economic benefits or service potential, is charged as an expense when it is incurred. 
1.6.2 Measurement
Assets are initially measured at cost, comprising of: 
• purchase price (the Council has no de minimis level set)
• any costs associated with bringing the asset to the location or condition necessary for it to be capable of operating
in the manner intended by management
• the initial estimate of costs for dismantling and removing the item and restoring the site on which it is located to its
original state. 
The Council does not capitalise borrowing costs incurred during construction of an asset. 
The cost of assets acquired other than by purchase is deemed to be its fair value unless the acquisition will not increase
the cash flows of the Council. In the latter case, the cost of the acquisition is the carrying amount of the asset given up
by the Council. 
Donated assets are measured initially at fair value. The difference between fair value and any consideration paid is
credited to the Taxation and Non-Specific Grant Income line of the Comprehensive Income and Expenditure Statement,
unless the donation has been made conditionally. Until conditions are satisfied, the gain is held in the Donated Assets
Accounts. Where gains are credited to the Comprehensive Income and Expenditure Statement, they are reversed out
of the General Fund Balance to the Capital Adjustment Account in the Movement in Reserves Statement. 
Page 161

Page 50

Page 38
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Assets are then carried in the Balance Sheet using the following measurement bases: 
• Infrastructure, community assets & assets under construction – depreciated historic cost.
• Surplus assets – current value as estimated at highest and best use from an open market perspective (fair
value). 
• All other assets – current value, determined as the amount that would be paid for the asset in its existing use
(existing use value). 
Where there is no market-based evidence of fair value because of the specialist nature of an asset, depreciated
replacement cost (DRC) is used as an estimate of current value. For non-property assets with short useful lives or low
values, depreciated historical cost basis is used as a proxy for current value. 
1.6.3 Revaluation
Assets included in the Balance Sheet at current value are re-valued regularly (as a minimum every five years) to ensure
their carrying amount is not materially different from the current value at the year end. The programme of revaluation
for 2024/25 and planned each of the following four years is as follows: 
2024/25 Halls, Public conveniences, libraries, outdoor centres, golf course, pavilions, sports
centres, swimming pools, travellers site and car parks
2025/26 Any properties not previously re-valued / general re-appraisal/ HRA housing stock
2026/27 Offices, depots, cemeteries and crematorium lodges.
2027/28 All Council non-operational properties
2028/29 Schools, school houses, social work homes, adult training centres, community
education centres and early education centres
In addition to assets being revalued within the programme of revaluation assets, will be revalued in any given year if
any of the following criteria are met:
• When the historic cost of the building is less than £2m but the combined value of the building historic cost and
any enhancement expenditure incurred since the last revaluation date exceeds £2m.
• Where the historic cost of the building exceeds £2m and where any enhancement expenditure incurred since
the last revaluation date exceeds 25% of the historic cost of the building.
• Where the combined value of building historic cost and any enhancement expenditure incurred since the last
revaluation date spend is less than £2m but the value of the enhancement expenditure exceeds 50% of building
historic cost and in value is more than £0.500m.
Valuations in 2024/25 have been carried out by an external valuer. Valuations of land and buildings are carried out in
accordance with the methodologies and bases for estimation set out in the professional standards of the Royal Institution
of Chartered Surveyors.
Increases in valuations are matched by credits to the Revaluation Reserve to recognise unrealised gains.  Exceptionally,
gains might be credited to the Surplus or Deficit on the Provision of Services where they arise from the reversal of an
impairment loss previously charged to a service. 
Where decreases in value are identified, the revaluation loss is accounted by: 
• where a balance of revaluation gains for the asset is held in the Revaluation Reserve – the carrying amount of the
asset is written down against that balance (up to the amount of the accumulated gains); or
• where no balance of revaluation gains for the asset is held in the Revaluation Reserve – the carrying amount is
written down against the relevant service line(s) in the Comprehensive Income and Expenditure Statement. 
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007, the date of its formal
implementation. Gains arising before that date have been consolidated into the Capital Adjustment Account. 
Page 162

Page 51

Page 39
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
1.6.4 Impairment
Assets are assessed at each year-end as to whether there is any indication that an asset may be impaired. Where
indications exist and any possible differences are estimated to be material, the recoverable amount of the asset is
estimated and, where this is less than the carrying amount of the asset, an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for by: 
• where a balance of revaluation gains for the asset is held in the Revaluation Reserve – the carrying amount of the
asset is written down against that balance (up to the amount of the accumulated gains); or
• where no balance of revaluation gains for the asset is held in the Revaluation Reserve – the carrying amount is
written down against the relevant service line(s) in the Comprehensive Income and Expenditure Statement. 
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service line(s) in the
Comprehensive Income and Expenditure Statement, up to the amount of the original loss, adjusted for depreciation that
would have been charged if the loss had not been recognised. 
1.6.5 Disposals
When it becomes apparent the carrying amount of an asset will be recovered principally through a sale transaction
rather than through its continuing use, it is re-classed as a Non-current Asset Held for Sale. The asset is re-valued
immediately before re-classification and then carried at the lower of this amount and the fair value less sale costs. 
Where there is a subsequent decrease to fair value less costs to sell, the loss is posted to the Other Operating
Expenditure line in the Comprehensive Income and Expenditure Statement. Gains in fair value are recognised only up
to the amount of any previous losses recognised in the Surplus or Deficit on the Provision of Services. Depreciation is
not charged on Assets Held for Sale. Assets that are to be abandoned or scrapped are not reclassified as Non-current
Assets Held for Sale.   
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet (whether
Property, Plant and Equipment or Assets Held for Sale) is written off to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement as part of the gain or loss on disposal. Receipts from disposals (if
any) are credited to the same line in the Comprehensive Income and Expenditure Statement also as part of the gain or
loss on disposal (i.e. netted off against the carrying value of the asset at the time of disposal). Any revaluation gains
accumulated for the asset in the Revaluation Reserve are transferred to the Capital Adjustment Account.
Amounts received for a disposal are categorised as capital receipts. The balance of receipts is credited to either the
Capital Receipts Reserve and can only be used for capital investment, set aside to reduce the Council’s underlying
borrowing requirement, to fund the principal element of loan charges or to fund premium charges. Receipts are
appropriated to these reserves from the General Fund balance in the Movement in Reserves Statement.
The written-off value of disposals is not a charge against council tax. It is appropriated to the Capital Adjustment Account
from the General Fund balance in the Movement in Reserves Statement. 
1.6.6 Depreciation
Depreciation is provided on all property, plant and equipment over their useful economic lives, with an exception made
for assets without a determinable finite useful life (i.e. non depreciating land and certain community assets) and assets
that are not yet available for use (i.e. assets under construction). The useful lives of assets and depreciation method
are as follows: 
Council Dwellings 10 – 80 years Straight line
Other buildings* 15 – 80 years Straight line
Open spaces 10 – 120 years Straight line
Infrastructure 15 – 120 years Straight line
Vehicles, plant, equipment 5 – 20 years Straight line
Intangibles 5 – 10 years Straight line
Other 10 – 120 years Straight line 
Page 163

Page 52

Page 40
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Where a material item of Property, Plant & Equipment asset has major components whose cost is significant in relation
to the total cost of the item, the components are depreciated separately. Significant components are deemed to be those
whose value is 25% or more of the total value of the asset. 
Revaluation gains are also depreciated, with an amount equal to the difference between current depreciation charged
on assets and the depreciation that would be chargeable based upon historic cost being transferred each year from the
Revaluation Reserve to the Capital Adjustment Account. 
1.6.7 Infrastructure Assets
The CIPFA/LASAAC Code of Practice for Local Authority Accounting in the United Kingdom requires infrastructure
assets to be measured using the historical cost measurement basis and carried at depreciated historical cost. Due to
information deficits it is unclear whether when an assets component is replaced, the old component has been
derecognised to avoid double counting. However, as parts of these assets are rarely replaced before the part has been
fully consumed and should therefore be fully depreciated at the date of replacement, the carrying amount to be
derecognised in respect of a replaced part of an infrastructure asset is a nil amount. 
The Scottish Government in recognising the challenge facing Council’s has agreed to permit temporary statutory
overrides whilst a permanent solution is developed within the Code. As outlined in the Local Government Finance
Circular 09/2022 the Council has adopted statutory overrides for the period 1 April 2021 to 31 March 2024 which permits
the council not to report gross cost and accumulated depreciation for Infrastructure assets. 
1.7 Assets Held for Sale
These assets are measured at fair value, based on the amount at which the asset could be exchanged between
knowledgeable parties at arm’s length, less costs to sell at the initial classification and at the end of each reporting date.
Revaluation gains shall be recognised for any initial or subsequent increase in fair value less costs to sell but not in
excess of the cumulative impairment loss or revaluation loss that have been recognised in the Surplus of Deficit on the
Provision of Services. Impairment losses (or revaluation losses) will be recognised for any 
subsequent decrease to fair value less costs to sell following reclassification in the Surplus or Deficit on the Provision
of Service even where there is a balance on the assets Revaluation Reserve. 
1.8 Heritage Assets
Heritage Assets are recognised and measured (including the treatment of revaluation gains and losses) in accordance
with the Council’s accounting policies on property, plant and equipment. However, some of the measurement rules are
relaxed in relation to heritage assets as detailed below. 
Type of Asset Valuation Method for Balance Sheet Purposes
Ship models/ Silver and
Commemorative wear 
The last formal valuations were by Bonhams, Sotheby’s and Phillips.
Further formal valuations will be commissioned where it is considered
there could potentially be a material change in value and where the value
of the asset is estimated to be in excess of £10,000.
Works of art  The last formal valuations were by Bonhams, Sotheby’s and Phillips.
Where a lower and upper valuation has been provided the mid valuation
has been used. Further formal valuations will be commissioned where it
is considered there could potentially be a material change in the value of
the assets held.
Civic Regalia The robes are not recognised on the balance sheet as they are
considered to have no significant value.  However the chains are reported
in the balance sheet at insurance value.
Sewing Machine Collection These collections are not recognised on the balance sheet as cost
information is not readily available. Nearly all the items are believed to
have an immaterial value.
Listed Buildings and
Scheduled Ancient Monuments
These assets are not recognised on the balance sheet as it is considered
that there is a lack of available, comparable market values to establish a
‘fair value’.  It is unlikely that Council would procure such assets but is
more likely to refurbish or enhance existing structures. In this respect, the
cost of those works will be capitalised at cost. 
Page 164

Page 53

Page 41
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Purchased assets are initially recognised at cost and donations are recognised at valuation where that value is estimated
to be greater than the threshold of £10,000 as specified above. The carrying amounts are reviewed where there is
evidence of impairment e.g. where an item has suffered physical deterioration or breakage or where doubts arise as to
its authenticity. Any impairment is recognised and measured in accordance with the Council’s general policies on
impairment. 
No depreciation shall be chargeable on any heritage asset, in view of the indeterminate life and residual value. 
The proceeds from any disposal of heritage assets are accounted for in accordance with the council’s general provisions
relating to the disposal of property, plant and equipment. 
1.9 Right of Use Assets
The Council adopted IFRS 16 (Leases) with effect from 1 April 2024.  The main impact of the requirements of IFRS 16
is that, for arrangements previously accounted for as operating leases (i.e. without recognising the leased vehicles,
plant, equipment, property and land as an asset, and future rents as a liability), a right-of-use asset and a lease liability
are now included on the balance sheet from 1 April 2024. The Council has elected to apply recognition exemptions to
low value assets (below £10,000 when new) and to short-term leases i.e. existing leases that expire on or before 31
March 2025, and new leases with a duration of less than 12 months. A contract is, or contains a lease, if the contract
conveys the right to control the use of an identified asset for a period of time in exchange for consideration.   
1.10     Employee Benefits
1.10.1  Benefits payable during employment
Short term employee benefits (i.e. fall due within 12 months of the year-end), such as wages and salaries, paid leave,
paid sick leave, bonuses and non-monetary benefits for current employees are recognised as an expense in the year
in which the employees render service to the Council. An accrual is made against the services in the Surplus or Deficit
on the Provision of Service for the costs of holiday entitlement and other forms of leave earned by the employee but not
taken before the year end and which employees can carry forward into the next financial year. Any accrual made is
required under statute to be reversed out of the General Fund balance by a credit to the Statutory Mitigation Account in
the Movement in Reserves Statement. 
1.9.2 Termination Benefits
Termination benefits are amounts payable as a result of a decision made by the Council to terminate an officer’s
employment before the normal retirement date or an officer’s decision to accept a voluntary termination package in
exchange for those benefits. Termination benefits do not provide the Council with future economic benefits and
consequently they are recognised on an accrual basis immediately in the Surplus or Deficit on the Provision of Services
line in the Comprehensive Income and Expenditure Account when the Council is demonstrably committed to provision
of the termination benefits. 
Where termination benefits involve the enhancement of pensions, they are treated as pension costs for the purpose of
the statutory transfer between the Pension Reserve and the General Fund of the amount by which the pension costs
calculated in accordance with the Code are different from the contributions due under the pension scheme regulations.
In the Movement in Reserves Statement appropriations are required to and from the Pension Reserve to remove
notional debits and credits for termination benefits related to pensions enhancements and replace them with the cost of
the cash paid, including any amounts due and not paid at the year end. 
1.9.3 Post Employment Benefits
Employees of the Council are members of two separate defined benefit pension schemes: 
• the Teachers’ Pension Scheme, administered by the Scottish Pensions Agency
• the Local Government Pensions Scheme, administered by Glasgow City Council. 
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned as employees
working for the Council. However, the arrangements for the teachers’ scheme mean that liabilities for these benefits
Page 165

Page 54

Page 42
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
cannot ordinarily be identified specifically to the Council. The scheme is therefore accounted for as if it were a defined
contribution scheme and no liability for future payments of benefits is recognised in the Balance Sheet. 
In relation to retirement benefits, statutory provisions require the General Fund to be charged with the amount payable 
by the Council to the pension fund or directly to pensioners in the year, not the amount calculated in accordance to the 
relevant accounting standards. In the Movement in Reserves Statement this means that there are appropriations to and 
from the Pension Reserve to remove any notional debits and credits for retirement benefits and replace them with the
cash paid or payable at the year end, to the pension fund and pensioners. The negative balance that arises on the
Pension Reserve measures the beneficial impact on the General Fund of being required to account for retirement
benefits on the basis of cash flows rather than as benefits earned by employees. 
The Local Government Pension Scheme 
The Local Government Scheme is accounted for as a defined benefits scheme: 
• The liabilities of the Strathclyde Pension Fund attributable to the Council are included in the Balance Sheet on
an actuarial basis using the projected unit method - i.e. an assessment of the future payments that will be made
in relation to retirement benefits earned to date by employees, based on assumptions about mortality rates,
employee turnover rates, etc. and projections of projected earnings for current employees. 
• Liabilities are discounted to their value at current prices, using a discount rate of 4.75% (based on the indicative
rate of return on high quality corporate bonds). 
• The assets of Strathclyde Pension Fund attributable to the Council are included in the Balance Sheet at their
fair value: 
o quoted securities - current bid price 
o unquoted securities - professional estimate 
o unitised securities - current bid price 
o property - market value 
The change in the net pension liability is analysed into the following components:
Service cost comprising: 
• Current service cost - the increase in liabilities as a result of years of service earned this year - allocated in
the Comprehensive Income and Expenditure Statement to the services for which the employees worked. 
• Past service cost - the increase in liabilities as a result of a scheme amendment or curtailment whose effect
relates to years of service earned in earlier years - debited to the Surplus or Deficit on the Provision of Services
in the Comprehensive Income and Expenditure Statement as part of Non-Distributable Costs.
• Gains/losses on settlements - the decrease in liabilities as a result of the Council entering into a transaction
that eliminates all further legal or constructive obligation relating to the event, notwithstanding the financial
guarantee (see Note 5) - credited to the Surplus on the Provision of Services in the Comprehensive Income &
Expenditure Statement as part of Non Distributable Costs. 
• Net interest on the net defined benefit liability, i.e. net interest expenses for the council. The change during
the period is the net defined benefit liability that arises from the passage of time charged to the Financing and
Investment Income and Expenditure line of the Comprehensive Income and Expenditure Statement – this is
calculated by applying the discount rate used to measure the defined benefit obligation at the beginning of the
period to the net defined liability at the beginning of the period – taking into account any changes in the net
defined benefit liability during the period as a result of contribution and benefit payments. 
Remeasurements comprising: 
• The return on plan assets - excluding amounts included in net interest on the net defined benefit liability –
charged to the Pension Reserve as Other Comprehensive Income and Expenditure 
• Actuarial gains and losses – changes in the net pensions liability that arise because events have not coincided
with assumptions made at the last actuarial valuation or because the actuaries have updated their assumptions
– charged to the Pensions Reserve as Other Comprehensive Income and Expenditure
• Contributions paid to the Strathclyde Pension Fund – cash paid as employer’s contributions to the pension fund
settlement of liabilities; not accounted for as an expense. 
Page 166

Page 55

Page 43
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
In relation to retirement benefits, statutory provisions require the General Fund Balance to be charged with the amount
payable by the Council to the pension fund or directly to pensioners in the year, not the amount calculated according to
the relevant accounting standards. In the Movement in Reserves Statement, this means there are transfers to and from
the Pensions Reserve to remove the notional debits and credits for retirement benefits and replace them with debits for
the cash paid to the pension fund and pensioners and any such amounts payable but unpaid at the year-end. A negative
balance that may arise on the Pensions Reserve thereby measures the beneficial impact to the General Fund of being
required to account for retirement benefits on the basis of cash flows rather than as benefits are earned by employees. 
1.9.4 Pension Net-Asset Recognition 
Where the Council’s share of the Local Government Pension Scheme is an overall asset position, reflecting that its
share of the Funds’ assets exceeds the present value of its liabilities to members, this is accounted for in line with the
requirements of IAS 19 and IFRIC 14. Specifically, the asset recognised by the Council is limited to the extent to which
the Council can recover the benefit of the asset through refunds or reduced contributions. This is referred to as an “asset
ceiling”. More information is provided in note 22 to the accounts 
1.9.5 Discretionary Benefits
The Council has restricted powers to make discretionary awards of retirement benefits in the event of early retirements.
Any liabilities estimated to arise as a result of an award to any member of staff (including teachers) arising from the use
of these discretionary powers are accrued in the year of the decision to make the award and accounted for using the
same policies as are applied to the local government pension scheme. 
1.10 Events after the Reporting Period
Events after the reporting period are those events (both favourable and unfavourable) that occur between the end of
the reporting period and the date the Financial Statements are authorised for issue. Two types have been identified: 
• those that provide evidence of conditions that existed at the end of the reporting period – the Financial
Statements are adjusted to reflect this
• those indicative of conditions that arose after the reporting period – the Financial Statements are not adjusted
to reflect this however, if material, a disclosure is made within the notes of the nature and financial effect. 
1.11 Exceptional Items
When items of income and expenditure are material, their nature and amount is disclosed separately, either within the
Comprehensive Income and Expenditure Statement or in the notes to the accounts, depending on how significant the
items are to the understanding of the Council’s financial performance. 
1.12 Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when the Council becomes party to the contractual provisions
of a financial instrument and initially measured at fair value and carried at their amortised cost. Annual charges to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement for
interest payable are based upon the carrying amount of the liability, multiplied by the effective rate of interest for the
instrument. The effective interest rate is the rate that exactly discounts estimated future cash payments over the life of
the instrument to the amount at which it was originally recognised. 
For most of the borrowing that the Council has this means that the amount presented in the Balance Sheet is the
outstanding principal repayable (plus accrued interest). Interest charged to the Comprehensive Income and Expenditure
Statement is the amount payable for the year according to the loan agreement. 
1.13 Financial Assets
Financial assets are classified using a classification and measurement approach that reflects the business model for
holding the financial assets and their cash flow characteristics.  There are three main classes of financial assets
measured at:
• amortised cost
• fair value through other comprehensive income
Page 167

Page 56

Page 44
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
• fair value through profit or loss 
The Council’s business model is to hold investments to collect contractual cash flows. Financial assets are all therefore
classified as amortised cost. In previous years these assets, although still recorded as amortised costs, were classed
as loans and receivables. 
1.13.1 Financial Assets Measured at Amortised Cost
Financial assets measured at amortised cost are recognised on the Balance Sheet when the authority becomes party
to the contractual provisions of a financial instrument and are initially measured at fair value. They are subsequently
measured at their amortised cost. Annual credits to the Financing and (Investment) Income and Expenditure line in the
CIES for interest receivable are based on the carrying amount of the asset multiplied by the effective rate of interest for
the instrument. For all financial assets held by the Council, this means that the amount presented in the Balance Sheet
is the outstanding principal receivable (plus accrued interest) and interest credited to the CIES is the amount receivable
for the year in the loan agreement.
1.13.2 Expected Credit Loss Model
The Council recognises expected credit losses on its financial assets held at amortised cost, either on a 12-month or
lifetime basis.  The expected credit loss model also applies to lesser receivables and contract assets.  Only lifetime
losses are recognised for trade receivables (debtors) held by the Council. 
1.13.3 Financial Assets measured at Fair Value through profit or Loss
Financial assets measured at fair value through profit or loss are recognised on the Balance Sheet when the Council
becomes a party to the contractual provisions of a financial instrument and are initially measured and carried at fair
value. Fair value gains and losses are recognised as they arrive in the Surplus or Deficit on the Provision of Services.
The fair value measurements of the financial assets are based on the following techniques:
• Instruments with quoted market prices – the market price
• Other instruments with fixed and determinable payments – discounted cash flow analysis 
Inputs to the measurement techniques are categorised in accordance with the following three levels:
• Level 1 inputs– quoted prices (unadjusted) in active markets for identical assets or liabilities that the authority
can access at the measurement date.
• Level 2 inputs – inputs other than quoted prices included within Level 1 that are observable for the asset or
liability, either directly or indirectly.
• Level 3 inputs – unobservable inputs for the asset or liability. 
Any gains and losses that arise on the derecognition of the asset are credited or debited to the Financing and Investment
Income and Expenditure line in the Comprehensive Income and Expenditure Statement. 
1.14 Government Grants and Contributions
Government grants and other contributions are recognised as due when there is reasonable assurance that: 
• the Council will comply with the conditions attached to the payments
• the grants or contributions will be received. 
Amounts recognised as due to the Council are not credited to the Comprehensive Income and Expenditure Account
until conditions attached to the grant or contribution have been satisfied. Conditions are stipulations that specify that the
future economic benefits or service potential embodied in the asset acquired using the grant or contribution are required
to be consumed by the recipient as specified for future economic benefit or service potential must be returned to the
transferor. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance
Sheet as creditors. When conditions are satisfied, the grant or contribution is credited to the relevant service line
Page 168

Page 57

Page 45
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
(attributable revenue grants/contributions) or Taxation and Non-Specific Grant Income (non-ringfenced revenue grants
and all capital grants) in the Comprehensive Income and Expenditure Statement. 
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are reversed out of
the General Fund balance in the Movement in Reserves Statement. Where the grant has not yet been used to finance
capital expenditure, it is posted to the Capital Grants Unapplied Account. Where it has been applied, it is posted to the
Capital Adjustment Account. Amounts in the Capital Grants Unapplied Account are transferred to the Capital Adjustment
Account once they have been applied. 
1.15 Inventories
Inventories are held by several Council services, such as asset maintenance services, roads, services, school technician
services, hospitality services, etc., and include consumable stock and work in progress, where appropriate. 
Consumable stock is included in the Balance Sheet on a cost price basis, with inventory quantities based on physical
stock at the end of the year. 
1.16 Leases
1.16.1 Council as Lessee
The Council classifies contracts as leases based on their substance. Contracts and parts of contracts, including those
described as contracts for services, are analysed to determine whether they convey the right to control the use of an
identified asset, through rights both to obtain substantially all the economic benefits or service potential from that asset
and to direct its use. The Code expands the scope of IFRS 16 Leases to include arrangements with nil consideration,
peppercorn or nominal payments. 
1.16.2 Council as Lessor
Finance Leases
When the Council grants a finance lease over an asset, the asset is written out of the Balance Sheet as a disposal. At
the start of the lease the carrying amount of the asset is written off to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement as part of the gain/loss on disposal. A gain, representing the
Council’s net investment in the lease is credited to the same line in the Comprehensive Income and Expenditure
Statement, matched by a lease asset in the Balance Sheet. Lease rentals receivable are apportioned between: 
• a receipt for the acquisition of the interest in the asset – applied to write down the lease asset (together with
any premiums received)
• finance income (credited to the Financing and Investment income and Expenditure line in Comprehensive
Income and Expenditure Statement). 
The gain credited to the Comprehensive Income and Expenditure Statement on disposal is not permitted by statute to
increase the General Fund balance and will be required to be treated as a capital receipt. Where a premium has been
received, this is posted out of the General Fund Balance to the Capital Receipts Reserve in the Movement in Reserves
Statement. Where the amounts due in relation to the lease asset is to be settled by the payment of rentals in future
financial years, this is posted out of the General Fund Balance to the Deferred Capital Receipts Reserve in the
Movement in Reserves Statement. When the future rentals are paid, the element of the charge for the acquisition of the
interest in the asset is used to write down the lease asset. At this point, the deferred capital receipts are transferred to
the Capital Receipts Reserve. 
The written off value of the disposals is not a charge against council tax, as the cost of non-current assets is fully
provided for under separate arrangements for capital financing. Amounts are appropriated to the Capital Adjustment
Account from the General Fund balance in the Movement in Reserves Statement. 
Operating Leases
Where the Council grants an operating lease over an asset, the asset is retained in the Balance Sheet. Rental income
is credited to the Other Operating Expenditure line in the Comprehensive Income and Expenditure Statement. Credits
are made on a straight line basis over the life of the lease, even if it doesn’t match the pattern of payment. 
Page 169

Page 58

Page 46
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
1.17 Overhead and Support Services
The costs of overheads and support services are charged to non-General Fund services that benefit from the supply in
accordance with the costing principles of the CIPFA Service Reporting Code of Practice 2024/25. The total absorption
costing principle is used – the full cost of overheads and support services are shared between those users in proportion
to the benefits received. General Fund Services have not been charged for these support service costs, in line with the
Council’s budgetary reporting structure. 
1.18 Public Private Partnership (PPP) and Similar Contracts
PPP and similar contracts are agreements to receive services, where the responsibility for making available the property,
plant and equipment needed to provide the services passes to the private contractor. As the Council is deemed to
control the services that are provided under the PPP scheme and as ownership of the property, plant and equipment
will pass to the council at the end of the contract for no additional charge, the Council carries the asset on its Balance
Sheet. 
1.18.1 Service Concession Arrangement Flexibility Application 
The Scottish Government’s 2022 Resource Spending Review contained details of a Service Concession Arrangement
(SCA) flexibility that related to the Council’s PPP schools.  The flexibility permits councils to undertake internal
accounting changes that extend the period over which the principal repayment of the unitary charge can be made which
results in a one-off credit to the General Fund and ongoing annual savings for a period of time. In the remaining years
following the end of the SCAs, the rescheduled debt repayments continue until the debt liability has been extinguished.
The Statutory Regulation in relation to this matter, Local Government Finance Circular 10/2022 (FC 10/2022), was
published in September 2022. 
FC 10/2022 replaces the 2010 version that covered this area and permits the authority to apply a temporary flexibility
for service concession arrangements entered prior to April 2022. The Circular sets out the accounting requirements and
the options permitted for the recognition of repayments of the principal element of the lease component or the lease
liability for the year and the temporary flexibility for SCAs entered prior to 1 April 2022. 
The Council has applied the permitted change in the calculation of the statutory charge and the adopted approach has
been applied across all arrangements held by the Council in line with the key accounting principle of consistency. 
The annual unitary charge will continue to be paid to the contractor over the contract period. The guidance applies to
principal and not to interest, service charge costs or grant. These will continue to be accounted for over the contract
period. 
Annuity method for revised repayment of debt liability 
The recalculation of the debt liability charges applies the annuity method to calculate the revised repayments. This
method best represents the consumption of the assets over their useful lives. 
This methodology is applied within the Councils current Loans Fund repayment policy. The use of an annuity method
for the writing down of the PPP debt liability therefore ensures a consistent approach for the writing down of all debt
which is financing capital expenditure, in that. 
• The annuity method provides a fairer charge than equal instalments as it takes account of the time value of
money, whereby paying £100 in 10 years’ time is less of a burden than paying £100 now. 
• The schedule of charges produced by the annuity method thus results in a consistent charge over an asset’s
life, considering the real value of the amounts when they fall due. 
• The annuity method is a prudent basis for providing for assets that provided a steady flow of benefits over their
useful life.’ 
Useful Economic Life 
The most appropriate asset life for the calculation is considered to be 60 years which replicates the useful asset life of
other similar type assets held on the Council’s balance sheet i.e. schools. The Council’s Loans Fund methodology use
Page 170

Page 59

Page 47
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
a Useful Economic Life (UEL) of 60 years when calculating the repayment of debt liability for borrowing to support capital
expenditure for similar types of assets. The proposed application a UEL of 60 years for the two SCAs arrangements is
therefore considered consistent with current council methodology. 
Capital Financing Requirement 
The reprofiling of the debt liability repayments over the life of the asset rather than the life of the contract increases the
Capital Financing Requirement (CFR) as at 1 April 2022. The increase in the CFR will continue to be reduced by the
revised repayments after each SCA contract has expired until the end of the revised period. 
Accounting Treatment 
The statutory adjustment can be made as at 1 April in the year the revised repayments are applied. This option was
exercised in 2022/23 and has been applied retrospectively. Being a cumulative statutory adjustment there is no prior
year restatement of statutory adjustments in the Annual Accounts. The statutory adjustment results in a debit to the
Capital Adjustment account with a corresponding credit in the Movement in Reserves Statement within the General
Fund. Until the end of the contract period for each of the five SCAs. Thereafter the revised charges will result in higher
cost being charged to the General fund that the current repayment profile until the end of the UEL 
1.19 Provisions
Provisions are made where an event has taken place that gives the Council a legal obligation or constructive obligation
that probably requires settlement by a transfer of economic benefits or service potential and a reliable estimate can be
made of the amount of that obligation. 
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income and Expenditure
Statement in the year the Council becomes aware of the obligation and measured at the best estimate at the Balance
Sheet date, taking account of relevant risks and uncertainties. 
When payments are made they are charged to the provision carried in the Balance Sheet. Estimated settlements are
reviewed at the end of each financial year. Where it becomes less probable that a transfer of economic benefits is
required; the provision is reversed and credited back to the relevant service. 
1.20 Interest in Companies and Other Entities
The Council has material interests in companies and other entities that have the nature of associates/ subsidiaries and
require it to prepare group accounts. In the Council’s own single entity accounts, the interests of two companies are
recorded as an investment in the Balance Sheet, as the Council has shares and full ownership of the Clydebank Property
Company (purchased during 2014/15) and has an investment with Hub West Scotland (invested 2015/16). No other
interests are recorded in the Council’s single entity accounts of any of other organisation. 
1.21 VAT
VAT payable is included as an expense only to the extent that it is not recoverable from HM Revenue and Customs.
VAT receivable is excluded from income.
1.22 Loans Advances Repayment
In accordance with The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016, the Council has
recalculated the repayments of the loans fund advances to reflect the life of the specific assets associated with the debt,
using an annuity of 9%. 
Page 171

Page 60

Page 48
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Note 2 – Critical Judgement in Applying Accounting Policies
The preparation of the consolidated financial statements requires management to make some judgements and
assumptions when applying the accounting policies that have the most significant effect on carrying amounts in the
financial statements. These judgements are usually about complex transaction or involve uncertainty about future
events. Where a critical judgement has been made, this is referred to in the relevant note to the core financial statements;
however, a summary of those with the most significant effect are detailed below: 
Public Private Partnership (PPP) and Design-Build-Finance-Maintain (DBFM) - The Council has entered into a
PPP contract for the provision of three secondary schools and one primary school. The Council has also entered into a
DBFM contract for one secondary school. The contracts include the build of the schools as well as their maintenance
and provision of related facilities over the period of each contract. After consideration of International Financial Reporting
Interpretations Committee IFRIC12 (Service Concession Arrangements), it has been concluded that these are service
concession arrangements and the Council controls the services provided under the scheme and ownership of the
schools will pass to the Council at the end of the contracts for no additional charge. The assets used to provide services
at the schools are recognised on the Council’s Balance Sheet as operational assets and as a finance lease liability. The
value of these assets (£98.765m) is included within the Property, Plant and Equipment (Note 14) and the liability within
note 15 - Private Finance Initiatives and similar Contracts (£87.449m). 
Council Acting as Principal or Agent - When the Council receives funding it requires to consider the degree of control
it has over how this funding is to be utilised. If the Council has no discretion over the utilisation of the funds it deems
that it is acting as an agent and this funding is reported in the Agency Services note and not reflected in the Council’s
income and expenditure, but with any amounts owed to/ from the Council held within its Balance Sheet. 
Provision or Contingent Liability - Where the Council faces a future liability and this can be quantified with a
reasonable degree of certainty, a provision for that liability is made. If the liability cannot be quantified, it will be disclosed
as a Contingent Liability (Note 30). Most of these involve ongoing or prospective legal action meaning the outcome and
potential amounts involved cannot be determined with any level of accuracy.  
Page 172

Page 61

Page 49
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 3 – Assumptions Made About the Future and Other Major Sources of
Estimation Uncertainty
The Financial Statements contain estimated figures that are based on assumptions about the future or that are otherwise
uncertain. Estimates are made taking into account historical experience, current trends and other relevant factors.
However, because balances cannot be determined with certainty, actual results could be materially different from the
assumptions and estimates. The items in the Council’s balance sheet as at 31 March 2025, for which there is a significant
risk of material adjustment in the forthcoming financial year are noted below: 
Item Uncertainties Effect if Actual results Differ from Assumptions
Property Plant
and
Equipment –
valuation
The Council’s assets are valued on a
rolling programme over a maximum of 5
years. The valuation assumptions are
ascertained by the professional valuers
used by the Council. 
If the actual results differ from the assumptions, the
value of the assets could be affected.
The value of the assets subject to revaluation over
the rolling programme is £898.688m. 
During 2024/25 the assets that were revalued are
now held in the Balance Sheet to a total value of
£44.482m.  The impact for each 1% change in
these valuations would be £0.445m within the
Balance Sheet, resulting in an increase or a
decrease to the Revaluation Reserve, or an
impairment charge, but with no effect on the
General Fund or the HRA reserves.
Indexation was carried out for DRC assets not
revalued within the year using the rate of 2.9% for
23/24 and 2.3% for 24/25, totalling £10.561m. 
The impact for each 1% change in these indexation
rates would be £4.371m within the Balance Sheet,
resulting in an increase or a decrease to the
Revaluation Reserve, but with no effect on the
General Fund or the HRA reserves.
Any change would also impact on annual
depreciation charges in future years.
Property Plant
and
Equipment –
depreciation /
useful lives
Assets are depreciated over useful lives
that are dependent on assumptions about
the level of repairs and maintenance that
will incur in relation to those assets. The
current economic climate makes it
uncertain that the Council will be able to
sustain its current level of spending on
maintenance, bringing into doubt the
useful lives assigned to assets.
If the useful life of an asset is reduced, depreciation
increases and the carrying amount of the asset
falls.  For example, it is estimated that for a building
valued at £20 million with a useful economic life of
60 years, the annual depreciation charge would
increase by £5,650 if the useful economic life had to
be reduced by one year. 
Pension
Liability/Asset
Estimation of the net asset/liability to pay
pensions depends on a number of
complex judgements relating to the
discount rates used, the rate at which
salaries are projected to increase by,
changes to retirement ages, mortality
rates and expected returns on pension
assets held. This is further detailed within
Note 22 to the Financial Statements. A
firm of consulting actuaries is engaged to
provide the Council with expert advice
about the assumptions applied.
The effect on the net asset/liability can be
measured. For example, a decrease in the discount
rate of 0.1% would decrease the pension asset held
on the Balance sheet by 2% or £12.153m; and
increase in the pension rate by 0.1% would
decrease the pension asset held on the Balance
sheet by 2% or £11.682m.  The interaction of
assumptions is extremely complex.  See note 22 for
further assumptions. 
Page 173

Page 62

Page 50
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 4 Accounting Standards that have been issued but have not yet been
adopted
For 2024/25, the Code requires the disclosure of information relating to the expected impact of an accounting change
that will be required by a new standard that has been issued but not yet adopted. This applies to the adoption of the
following new or amended standards: 
• IAS 21 The Effects of Changes in Foreign Exchange Rate (Lack of Exchangeability) issued in August 2023.
The amendments to IAS 21 clarify how an entity should assess whether a currency is exchangeable and how
it should determine a spot exchange rate when exchangeability is lacking, as well as require the disclosure of
information that enables users of financial statements to understand the impact of a currency not being
exchangeable.   
Until this change, IAS 21 set out the exchange rate to use when exchangeability between two currencies is
temporarily lacking, but not what to do when lack of exchangeability is not temporary. 
On 15 August 2023, the IASB issued amendments to IAS 21 to help entities: 
• assess exchangeability between two currencies; and 
• determine the spot exchange rate, when exchangeability is lacking. 
This amendment is not expected to have a significant impact on the financial statements. 
• IFRS 17 Insurance Contracts issued in May 2017. IFRS 17 replaces IFRS 4 and sets out principles for
recognition, measurement, presentation and disclosure of insurance contracts. - such contracts are not written
by the Council. 
This amendment will not have an impact on the Council’s financial statements. 
• The changes to the measurement of non-investment assets within the 2025/26 Code include adaptations and
interpretations of IAS 16 Property, Plant and Equipment and IAS 38 Intangible Assets. These include setting
out three revaluation processes for operational property, plant and equipment, requiring indexation for tangible
noninvestment assets and a requirement to value intangible assets using the historical cost approach. These
have the same effect as requiring a change in accounting policy due to an amendment to standards, which
would normally be disclosed under IAS 8. However, the adaptations also include a relief from the
requirements of IAS 8 following a change in accounting policy.   
The Council follows current valuation guidelines as laid down by The Code. This amendment is not expected
to have a material effect on the financial statements. 
Page 174

Page 63

Page 51
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 5 Expenditure and Funding Analysis
The Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources (Government
Grants, Council Tax and Non-Domestic Rates) by local authorities in comparison with those resources consumed or
earned by authorities in accordance with generally accepted accounting practices. It also shows how expenditure is
allocated for decision making purposes between the Council’s services. Income and expenditure accounted for under
generally accepted accounting practices is presented more fully in the Comprehensive Income & Expenditure
Statement.
Expenditure
chargeable to
the General
Fund and HRA
Balance
Adjustments
between
Funding and
Accounting
Basis
Net Expenditure in
the Comprehensive
Income and
Expenditure
Statement
£'000 £'000 £'000
Resources 3,967 1,742 5,709
Regulatory and Regeneration 3,837 5,295 9,132
People & Technology 10,006 2,517 12,523
Citizens, Culture and Facilities 13,819 1,911 15,730
Education, Learning and Attainment 127,598 7,980 135,578
Roads and Neighbourhood 18,053 8,162 26,216
Housing and Employability 3,289 1,988 5,277
Miscellaneous Services (3,838) (1,828) (5,666)
Health and Social Care Partnership 89,859 5,951 95,810
Requisitions 2,406 0 2,406
Housing Revenue Account (26,662) 15,603 (11,059)
Net Cost of Service 242,334 49,322 291,656
(Gain)/Loss on disposal of non-current assets 0 1,999 1,999
Financing and Investment (Income) and Expenditure (Note 8) 63,189 (18,902) 44,287
Taxation and Non-specific Grant Income (Note 9) (323,734) 11,567 (312,167)
(Surplus) or Deficit on the Provision of Services (18,211) 43,986 25,775
Opening General Fund and HRA Balance at 1 April 2024 (16,340)
Surplus/(Deficit) on HRA in the year 358
Surplus/(Deficit) on General Fund  in the year 4,566
transfer (to)/from other Statutory Reserves (1,658)
Closing General Fund and HRA balance at 31 March 2025 (13,074)
Adjustments between General Fund and Comprehensive Income and Expenditure Statement
2024-25
Adjustment for
Capital Purposes
Net change to
Pension
Adjustment
Other
differences
Total
Adjustments
£'000 £'000 £'000 £'000
Resources 1,216 526 0 1,742
Regulatory and Regeneration 4,750 545 0 5,295
People & Technology 1,722 795 0 2,517
Citizens, Culture and Facilities 596 1,315 0 1,911
Education, Learning and Attainment 5,015 2,745 220 7,980
Roads and Neighbourhood 6,662 1,500 0 8,162
Housing and Employability 0 1,988 0 1,988
Miscellaneous Services 55 (1,955) 72 (1,828)
Health and Social Care Partnership 1,375 4,576 0 5,951
Requisitions 0 0 0 0
Housing Revenue Account 14,862 744 (3) 15,603
Net Cost of Services 36,254 12,779 289 49,322
Other operating expenditure 1,999 0 0 1,999
Financing and Investment (Income) and Expenditure (21,249) 2,377 (30) (18,902)
Taxation and Non-specific Grant Income 11,567 0 0 11,567
Difference between General Fund and HRA (Surplus)/Deficit and
Comprehensive Income & Expenditure Statemet (Surplus)/Deficit on the
Provision of Service
28,571 15,156 259 43,986
Page 175

Page 64

Page 52
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Comparative Figures for 2023-24
2023/24
Expenditure
chargeable to the
General Fund and
HRA Balance
Adjustments
between
Funding and
Accounting
Basis
Net Expenditure in
the Comprehensive
Income and
Expenditure
Statement
£'000 £'000 £'000
Resources 2,070 1,068 3,138
Regulatory and Regeneration 3,189 4,429 7,618
People & Technology 10,517 1,637 12,154
Citizens, Culture and Facilities 14,053 424 14,477
Education, Learning and Attainment 115,259 10,167 125,426
Roads and Neighbourhood 20,705 6,989 27,694
Housing and Employability 4,478 164 4,642
Miscellaneous Services (325) (1,388) (1,713)
Health and Social Care Partnership 85,125 1,616 86,741
Requisitions 2,401 0 2,401
Housing Revenue Account (18,549) 13,892 (4,657)
Net Cost of Service 238,923 38,998 277,921
(Gain)/Loss on disposal of non-current assets 0 160 160
Financing and Investment (Income) and Expenditure (Note x) 39,033 (9,387) 29,646
Taxation and Non-specific Grant Income (Note x) (257,109) (40,961) (298,070)
(Surplus) or Deficit on the Provision of Services 20,847 (11,190) 9,657
Opening General Fund and HRA Balance at 1 April 2023 (34,177)
Surplus/(Deficit) on HRA in the year 1,666
Surplus/(Deficit) on General Fund in the year 19,180
Surplus/(Deficit) on General Fund and HRA in the year (3,009)
Closing General Fund balance at 31 March 2024 (16,340) 
Adjustments between General Fund and Comprehensive Income and Expenditure Statement
2023-24
Adjustment
for Capital
Purposes
Net change to
Pension
Adjustment
Other
differences
Total
Adjustments
£'000 £'000 £'000 £'000
Resources 1,004 64 0 1,068
Regulatory and Regeneration 4,387 42 0 4,429
People & Technology 1,599 38 0 1,637
Citizens, Culture and Facilities 324 100 0 424
Education, Learning and Attainment 9,775 220 172 10,167
Roads and Neighbourhood 6,864 125 0 6,989
Housing and Employability 0 164 0 164
Miscellaneous Services 0 (1,368) (20) (1,388)
Health and Social Care Partnership 1,244 360 12 1,616
Requisitions 0 0 0 0
Housing Revenue Account 13,840 52 0 13,892
Net Cost of Services 39,037 (203) 164 38,998
Other operating expenditure 160 0 0 160
Financing and Investment (Income) and Expenditure (9,387) 0 0 (9,387)
Taxation and Non-specific Grant Income (35,796) (5,126) (39) (40,961)
Differnece between general Fund (Surplus)/Deficit and
Comprehensive Income & Expenditure Statemet (Surplus)/Deficit on
the Provision of Service
(5,986) (5,329) 125 (11,190)
Page 176

Page 65

Page 53
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Adjustments for Capital Purposes
This column adds in depreciation, impairment and revaluation gains and losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal of assets and
the amounts written off for those assets. 
• Financing and investment income and expenditure – the statutory charges for capital financing and other
revenue contributions are deducted from other income and expenditure as these are not chargeable under
generally accepted accounting practices. 
• Taxation and non-specific grant income and expenditure – capital grants are adjusted for income not chargeable
under generally accepted accounting practices. Revenue grants are adjusted from those receivable in the year
to those receivable without conditions or for which conditions were satisfied throughout the year. The Taxation
and Non-Specific Grant Income and Expenditure line is created with capital grants receivable in the year without
conditions or for which conditions were satisfied in the year. 
Net Change for the Pension Adjustments 
Net change for the removal of pension contributions and the addition of IAS19 Employee Benefits pension related
expenditure and income:
• For services, this represents the removal of the employers contributions made by the Council as allowed by
statute and the replacement with current service costs and past service costs. 
• For financing and investment income and expenditure, the net interest on the defined benefit liability is charged
to the Comprehensive Income and Expenditure Statement.
Other Differences 
Other differences between amounts debited or credited to the Comprehensive Income and Expenditure Statement and
amounts payable or receivable to be recognised under statute: 
• For services an adjustment is made for the accrual of holiday pay and other similar entitlements, this is required
under generally accepted accounting principles but the impact on the General Fund and the HRA is mitigated
by statute which allows the impact to be reversed out through the Movement in Reserves.
• For Financing and investment income and expenditure, the ‘other differences’ column recognises adjustments
to the General Fund for the timing differences for premiums and discounts.
Expenditure and Income Analysed by Nature
Where items are not disclosed on the face of the Comprehensive Income and Expenditure Statement.  The code
requires a disclosure of the nature and amount of material items.  An analysis of material items of income and
expenditure by nature is shown below: 
2023-24 2024-25
£'000 £'000
Expenditure
239,621 Employee Benefits Expenses 242,313
248,741 Other Service Expenses 254,354
39,037 Depreciation, Amortisation, Impairment 36,253
29,277 Interest payments 44,297         
2,401 Precepts and levies 2,406
160 (Gain) or Loss on Disposal of Assets 1,999
559,237 Total Expenditure 581,623
Income (549,580)
(250,325) Fees, charges and Other Service Income (200,623)
(40,798) Income from Council Tax (41,701)
(93,396) income from Non-domestic rates (129,182)
(1,185) Interest and Investment Income (1,356)
(163,876) Government grants and Contributions (182,985)
(549,580) Total Income (555,848)
9,657 (Surplus)/Deficit  on the Provision of Service 25,775
Page 177

Page 66

Page 54
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 6 Adjustments between Accounting Basis and Funding Basis under Regulations
This note provides further breakdown of the adjustments summarised in the Movement in Reserves Statement on page 36. It is identified under the headings
Usable and Unusable Reserves. Further detail of the reserves identified under the classification of usable and unusable is given in notes 7 and 24 respectively.
2024-25
General Fund
Balance HRA Balance
Capital Grants
and Receipts
Unapplied
Account Capital Fund
Total Usable
Reserves
Capital 
Adjustment
Account
Revaluation
Reserve
Pension
Reserve
Employee
Statutory
Adjustment
Account FIAA
Total Unusable
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Charges for depreciation and impairment of non-current
assets
-21264 -14836 0 0 (36,100) 36,100 0 0 0 0 36,100
Amortisation of intangible assets -127 -26 0 0 (153) 153 0 0 0 0 153
Capital Grants and Contributions applied 13,335 7,914 0 0 21,249 (21,249) 0 0 0 0 (21,249)
Capital expenditure charged in year to revenue balances (51) 0 0 0 (51) 51 0 0 0 0 51
Disposal of Fixed Assets (1,999) 0 (1,493) 0 (3,492) 3,492 0 0 0 0 3,492
Capital expenditure charged to revenue (CFCR) 0 0 0 0 0 0 0 0 0 0 0
Statutory Repayment of Debt - Loans Fund Advances 5,114 9,764 0 0 14,877 (14,310) 0 0 0 (567) (14,877)
Statutory Repayment of Debt - PPP Finance - service
concession adjusment (3,590) 0 0 0 (3,590) 3,590 0 0 0 0 3,590
Adjustment to the statutory repayment of debt for service
concession arrangements - permitted flexability 330 330 (330) (330)
Adjustment between CAA and Revaluation Reserve for
depreciation  that is related to the revaluation balance
rather than Historic Cost.
0 0 0 0 0 (2,051) 2,051 0 0 0
0
Amounts by which finance costs charged to the CIEs are
different from finnace costs chargeable in the year in
accordance with statutory requirements
28 2 0 0 30 0 0 0 0 (30)
(30)
Reversal of items relating to retirement benefits debited or
credited to the CIES (Note 22) (22,723) (1,180) 0 0 (23,903) 0 0 23,903 0 0 23,903
Employers' pension contributions payable in the year 8,311 436 0 0 8,747 0 0 (8,747) 0 0 (8,747)
Amount by which employees’ remuneration charged to the
CIES on an accrual basis is different from remuneration
chargeable in the year in accordance with statutory
requirements
(292) 3 0 0 (289)
0 0 0 289 0 289
Total Statutory Adjustments (22,928) 2,077 (1,493) 0 (22,345) 5,446 2,051 15,156 289 (597) 22,345
Page 178

Page 67

Page 55
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Comparative Information 2023-24 
2023-24
General
Fund
Balance
HRA
Balance
Capital
Grants
and
Receipts
Unapplied
Account
Capital
Fund
Total
Usable
Reserves
Capital 
Adjustment
Account
Revaluation
Reserve
Pension
Reserve
Employee
Statutory
Adjustment
Account FIAA
Total
Unusable
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Charges for depreciation and impairment of non-
current assets (25,092) -13834 (38,926) 38,926 38,926
Amortisation of intangible assets (106) (6) (112) 112 112
Capital Grants and Contributions applied 24,252 11,544 35,796 (35,796) (35,796)
Capital expenditure charged in year to revenue
balances (77) 0 (77) 77 77
Disposal of Fixed Assets (160) (3,082) (3,242) 3,242 3,242
Capital expenditure charged to revenue (CFCR) 0 0 0
Statutory Repayment of Debt - Loans Fund
Advances 4,363 7933 12,296 (11,684) (612) (12,296)
Statutory Repayment of Debt - PPP Finance -
service concession adjusment -3139 (3,139) 3,139 3,139
Adjustment to the statutory repayment of debt for
service concession arrangements - permitted
flexability
307 307 (307)
(307)
Amounts by which finance costs charged to the
CIEs are different from finnace costs chargeable in
the year in accordance with statutory requirements
33 6 39 (39)
(39)
Pension Costs (transferred to (or from) the
Pensions Reserve 5,381 (52) 5,329 (5,329) (5,329)
0 0
Amount by which employees’ remuneration
charged to the CIES on an accrual basis is
different from remuneration chargeable in the year
(152) (12) 0 (164)
164 164
Total Statutory Adjustments 5,610 5,579 (3,082) 0 8,107 (2,291) 0 (5,329) 164 (651) (8,107)
Page 179

Page 68

Page 56
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 7 Earmarked Reserves
Reserves are created by appropriating amounts from the General Fund balance in the Movement in Reserves
Statement. When expenditure to be financed from a reserve is incurred, it is charged to the appropriate service within
the CIES. The reserve is then appropriated back into the General Fund balance in the Movement in Reserves Statement
(MiRS) so that there is no net charge against Council Tax for the expenditure. The Council has several usable reserve
funds. The Capital Fund is used to meet the costs of capital investment in assets and for the repayment of the principal
element of borrowings. 
Movements in the Council’s usable reserves are detailed in the Movement in Reserves Statement (MiRS).  The major
part of the General Fund balance shown in the MiRS has been earmarked and effectively committed to fund specific
projects in future years. The amounts set aside for earmarked reserves are shown in the following table: 
Balance at
1 April 2023
Transfers Out
2023/24
Transfers In
2023/24
Balance at
31 March
2024
Transfers Out
2024/25
Transfers In
2024/25
Balance at 31
March 2025
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Earmarked reserves: General Fund
Change Training budget 138 (137) 0 1 (1) 0 0
HR/Legal Commitments 210 0 0 210 (15) 0 195
Miscellaneous Employability Reserves 250 (250) 126 126 0 51 177
Miscellaneous Housing & Communities Reserves 155 (101) 499 553 (54) 21 520
Miscellaneous CCF Reserves 31 (6) 0 25 (25) 0 0
Miscellaneous Resources Reserves 252 (215) 0 37 (77) 493 453
Miscellaneous Economic Development & Regulatory Reserves 71 (31) 0 40 (48) 105 97
Miscellaneous Education Reserves 1,289 (405) 0 884 (725) 178 337
Miscellaneous People & Technology 0 0 0 0 (26) 35 9
Early Retiral/Voluntary Severence Reserve 8,962 (1,662) (3,950) 3,350 (3,077) 479 752
Cost of Living 1,839 (341) 0 1,498 (684) 0 814
Smoothing Fund for 2 year Service Transformation Project 3,000 (609) 0 2,391 (788) 0 1,603
SPFO in year reduction in employer pension contributions 0 0 0 0 (5,332) 10,489 5,157
DABVJB - Scottish Parliamentary Elections 26 (26) 0 0 0 0 0
Future Pay Awards 2,195 (2,195) 0 0 0 0 0
Prudential Target Future Years 1,799 (1,799) 0 0 0 0 0
Budget Funding reserve 4,598 (4,598) 0 0 0 0 0
Total: Earmarked Reserves - General Fund 24,815 (12,375) (3,325) 9,115 (10,852) 11,851 10,114
Earmarked Reserves: Housing Revenue Account
Service Improvements 650 (650) 0 0 0 0 0
Welfare Reform resilience Reserve 1,000 (1,000) 0 0 0 0 0
non-earmarked balance - HRA 985 (16) 0 969 (358) 0 611
Total: Earmarked Reserves - Housing Revenue Account 2,635 (1,666) 0 969 (358) 611
Capital Grants and receipts unapplied 72 (30) 171 213 (1,706) 1,493 0
Other Reserves 262 (68) 0 194 0 48 242
Non-earmarked balance 5,494 (5,494) 6,256 6,256 (3,907) 0 2,349
TOTAL RESERVES 33,278 (19,633) 3,102 16,747 (16,823) 13,392 13,316 
Note 8 Financing and Investment (Income) and Expenditure
2023-24 2024-25
£'000 £'000
Interest payable and similar charges:
8,197 Schools' Public Private Partnership finance lease 8,148
26,208 Other Interest Payable and Similar Charges 33,772
(1,185) Interest and Investment Income (1,356)
1,553 Impairment Loss- Debtors 1,346
(5,127) Net Pension Interest Expense 2,377
29,646 Total 44,287
Page 180

Page 69

Page 57
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Note 9 Taxation and Non-Specific Grant Income
2023-24 2024-25
£'000 £'000
(40,798) Council Tax (41,701)
(93,396) Non-Domestic Rates (87,481)
(128,080) Revenue Support Grant (161,736)
(35,796) Recognised Capital grants and contributions (21,249)
(298,070) Total (312,167)
Note 10 Grant Income
Government grants and third-party contributions and donations are recognised as due to the Council when there is
reasonable assurance that:
• The Council will comply with the conditions attached to the payments, and 
• The grants or contributions will be received. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance
Sheet as creditors. Where conditions are satisfied, the grant or contribution is credited to the relevant service line
(attributable revenue grants) or Taxation and Non-specific Grant Income (non-ring-fenced revenue grants and all capital
grants). Where capital grants are credited to the CIES, they are reversed out of the General Fund balance in the
Movement in Reserves Statement. 
The Council credited the following grants and other contributions to Taxation and Non-specific Grant Income within the
Comprehensive Income and Expenditure Statement in 2024/25: 
2023-24 Grant Income 2024-25
£'000 £'000
Credited to Taxation and Non Specific Grant Income
221,476 Revenue Support Grant 249,217
14,786 General Capital Grant 5,187
11,544 New House Build 7,914
4,733 Levelling Up Fund 6,486
492 Cycling, walking and safer Streets 0
2834 Exxon City Deal 1,051
154 Strathclyde Partnership for Transport 0
0 Clyde Mission Grant 258
0 Transport Scotland 149
738 Place Based Investments 0
10 Green Infrastructure Fund 0
35 Sustrans 0
470 Other Grants 204
257,272          Total 270,466
Page 181

Page 70

Page 58
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
The Council credited the following grants to Services within the Comprehensive Income and Expenditure Statement in
2024/25:
2023/24 Grant Income 2024/25
£'000 £'000
Credited  to Services
30,587 Housing Benefit Subsidy 29,115
462 Housing Benefit Subsidy Admin Charge 442
10,791 NHS Resource Transfer 10,975
0 Net Zero heating 100
10,012 Early Learning 414
4,587 Pupil Equity Fund 3,150
2,328 Criminal Justice 2,055
1,448 Scottish Attainment 1,105
2,144 Unitary Charge for DBFM 2,133
1,006 UK Shared Prosperity 2,811
988 Asylum Seekers 1,161
760 Child Poverty 801
577 Business Gateway 0
0 Young Person's Guarantee 0
329 Private Sector Housing 324
405 Care Experienced Children and young People 396
273 School Milk and Healthy Snacks 241
160 Mental Wellbeing 305
248 Education Maintenance Allowance 236
100 Community Food Bank Garden 0
0 Violence against women 121
0 Covid 19 Vaccination centre recovery funds 239
0 Community Intervention 111
0 Cash First Fund 116
505 No-one Left Behind 539
357 Grants under £0.100m 540
68,067 Total 57,430
Capital Grant Receipts in Advance
The Council has received a number of grants that have yet to be recognised as income as they have conditions attached
to them that will require the monies or property to be returned to the giver.  The balances at the yearend are as follows:
31 March 2024 31 March 2025
1,711 Levelling Up Funding 4,953
1,672 Clyde Mission 1,414
757 Clydebank Canal Investment 757
409 Place Based Investment 406
205 Inspiring School Age Childcare Spaces Fund 205
0 Pappert New Builds 0
0 Willox Park 0
8 Bank Street 0
107 Queen Mary Avenue  107
449 Grants under £0.100m 486
5,317 8,328
Page 182

Page 71

Page 59
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Note 11 Property, Plant and Equipment
11.1 Movement in Property, Plant & Equipment 2024-25
Council
dwellings
Other
Land &
buildings
Industrial
Units
Vehicles &
Plant Community
Surplus
Assets
Assets Under
Construction Total 2024-25 Infrastructure*
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost/Valuation at 1 April 2024 611,282 476,353 40,890 38,259 11,019 5,751 54,774 1,238,329 180,280
Additions 37,705 9,646 0 4,430 850 0 64,804 117,434 4,410
Disposals (1,333) (267) (2,605) 0 (124) 0 (4,329) 0
Revaluation adjustments to Revaluation Reserve 6,909 0 0 0 0 0 6,909 0
Revaluation adjustments to CIES (1,793) 0 0 0 0 0 (1,793) 0
Assets reclassified  to/from Assets under Construction 7,860 0 0 1,047 0 (9,281) (374) 296
Other reclassification of assets (648) 0 0 0 392 0 (256) 0
As at 31 March 2025 648,987 496,995 40,623 40,084 12,916 6,019 110,297 1,355,921 184,986
Depreciation/Impairment at 1 April 2024 (107,409) (31,905) (895) (19,798) (4,241) 0 0 (164,248) (67,289)
Depreciation charge (14,328) (8,057) (387) (3,871) (822) 0 0 (27,465) (8,463)
Depreciation on Disposals 78 4 2,605 0 0 0 2,687 0
Depreciation written out to the Revaluation Reserve 1,685 0 0 0 0 0 1,685 0
Revaluation written out to the CIES 1,647 0 0 0 0 0 1,647 0
Impairment losses/(reversal) to the Revaluation Reserve (32) 0 0 0 0 0 (32) 0
Impairment losses/(reversal) to the CIES (25) 0 0 0 0 0 (25) 0
Other movements in depreciation and impairment 20 0 0 0 (14) 0 6 0
As At 31 March 2025 (121,737) (36,590) (1,277) (21,064) (5,063) (14) 0 (185,745) (75,752)
Net Book Value at 31 March 2024 503,874 444,448 39,995 18,461 6,778 5,751 54,774 1,074,080 112,991
Net Book Value at 31 March 2025 527,250 460,405 39,345 19,020 7,853 6,005 110,296 1,170,174 109,234
1,074,081
Page 183

Page 72

Page 60
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
11.2 Movement in Property, Plant & Equipment 2023-24
Council
dwellings
Other Land
& buildings
Industrial
Units
Vehicles
& Plant Community
Surplus
Assets
Assets Under
Construction Total 2023-24 Infrastructure*
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost/Valuation at 1 April 2023 573,357 458,618 41,193 35,272 10,295 5,590 39,462 1,163,787 171,076
Additions 37,925 7,900 2,987 724 28,139 77,676 9,204
Disposals (41) (303) (225) (569)
Revaluation adjustments to Revaluation Reserve (5,567) 386 (5,181)
Revaluation adjustments to CIES 2,616 2,616
Assets reclassified  to/from  Held for Sale 12,827 (12,827) 0
Adjustments - assets at nil NBV 0
Other reclassification of assets 0
As at 31 March 2024 611,282 476,353 40,890 38,259 11,019 5,751 54,774 1,238,329 180,280
Depreciation/Impairment at 1 April 2023 (94,015) (30,413) (516) (16,165) (3,426) 0 0 (144,535) (58,776)
Depreciation charge (13,394) (10,230) (379) (3,633) (815) (28,451) (8,512)
Depreciation on Disposals 0 0 0
Depreciation written out to the Revaluation Reserve 2,487 2,487
Revaluation written out to the CIES 6,251 6,251
Impairment losses/(reversal) to the Revaluation Reserve 0
Impairment losses/(reversal) to the CIES 0
Other movements in depreciation and impairment 0
As At 31 March 2024 (107,409) (31,905) (895) (19,798) (4,241) 0 0 (164,248) (67,288)
Net Book Value at 31 March 2023 479,342 428,205 40,677 19,107 6,869 5,590 39,462 1,019,252 112,299
Net Book Value at 31 March 2024 503,873 444,448 39,995 18,461 6,778 5,751 54,774 1,074,080 112,992 
*As permitted by Finance Circular 09-2022 the council has adopted both Statutory Override 1 & 2 relating to infrastructure assets which allow for the following; 
Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2024 a local authority is not required to report the gross cost and accumulated depreciation for
infrastructure assets. 
Statutory Override 2: For accounting periods commencing 1 April 2010 until 31 March 2024 the carrying amount to be derecognised in respect of a replaced part of an infrastructure asset is to
be taken and accounted for as a nil amount. No subsequent adjustment shall be made to the carrying amount of the asset with respect to that part.
Page 184

Page 73

Page 61
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
11.3 Commitments under Capital Contracts
At 31 March 2025, the Council had commitments on capital contracts for the construction or enhancement of property,
plant and equipment for non-housing projects of £47.837m and housing projects of £10.852m. This expenditure will be
funded from a combination of Government Grants, borrowing and income from selling assets and contributions from
Revenue Accounts. Similar commitments at 31 March 2024 were £3.531m and £0.435m respectively. The major
commitments are: 
General Services £'000
Exxon Road - Construction of new relief road 34,000
Artizan Centre Redevelopment 4,563
Faifley Campus 4,318
Strathleven Place (Glencairn House) 1,540
Gruggies Burn 1,000
Salt Barn 400
Our Lady’s & St Patrick’s Changing Facility 341
ICT Swan2 339
Kilbowie & Christie Park PS Pitches 300
East End Football Pitch 259
Pappert MUGA 144
Play Parks 130
Mitchell Way design & development consultancy
support
114
HRA £'000
Bank Street New Build Housing 5,391
Willox Park New Build Housing 3,331
Pappert 1,477
Clydebank East New-Build Housing 561
11.4 Summary of Capital Expenditure and Financing
Capital expenditure involves the creation of assets, the benefit of which will be available to future rates and Council
taxpayers. It is financed from borrowing, capital receipts and capital grants. The cost of the asset is effectively borne
over a period of years. In 2024-25 total spending on capital projects was £122.234m.
2023-24 2024-25
£'000 £'000
742,283 Opening Capital Financing Requirement 787,076
Capital Investment
86,880 Property, Plant and Equipment 121,844
332 Intangibles 390
0 Asset held for sale 0
7 Heritage Assets 0
87,219 Total Capital Investment 122,234
Sources of Finance
3,082 Receipts from Sale of Assets 1,493
2,832 Sevice Concession - statutory adjustment 3,590
(35,796) Government Grants and other Contributions (21,249)
(171) Transfer to Capital Fund/ Capital Receipts Fund 0
(77) Revenue Contributions (51)
(12,296) Loan Fund Principal Repayments (14,877)
(42,426) Total Capital Financing (31,094)
787,076 Closing Capital Financing Requirement 878,215
Movements in the year
44,793 Increase in Underlying Need to Borrow 91,139
Increase/(Reduction) in PPP finance lease creditor
44,793 Movement in Capital Financing Requirement 91,139
Page 185

Page 74

Page 62
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Note 12 Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the Council as a result
of past events (e.g. computer software and/or software licences) is capitalised when it is expected that future economic
or service benefits will flow from the asset to the Council. 
The Council accounts for its software as intangible assets, to the extent that the software is not an integral part of a
particular IT system and accounted for as part of the hardware item of property, plant and equipment. The intangible
assets include purchased licences. 
Where appropriate, the carrying amount of intangible assets is amortised on a straight-line basis. The amortisation of
£0.115m charged to revenue in 2024/25 was charged to Information Services. The charge to Information Services is
then absorbed as an overhead across all the service headings in the Net Cost of services. It is not possible to quantify
exactly how much of the amortisation is attributable to each service heading. 
The movement in intangible assets during the year was:
2023/24 2024/25
£'000 £'000
Balance at 1 April
1,242 Gross carrying amount 1,574
(520) Accumulated amortisation (632)
722 Net carrying amount at start of year 942
332 Acquisitions in year 390
0 Transfer from assets under Construction 77
(112) Amortisation for period (153)
942 Net carrying amount at 31 March 1,256
Comprising:
1,574 Gross Carrying amounts 2,041
(632) Accumulated amortisation (785)
942 1,256
Note 13 Heritage Assets
Heritage assets are both tangible and intangible assets with historic, artistic, scientific, technological, geographical or
environmental qualities, which are held and maintained primarily for their contribution to knowledge and culture. The
authority holds heritage assets of six main types: 
• Models of Ships,
• Works of Art,
• Silver and Commemorative Ware,
• Civic Regalia (Robes and Chains),
• Sewing Machine Collections,
• Listed Buildings and Scheduled Ancient Monuments. 
The valuation of these assets held on the balance sheet as detailed below:
2023/24 2024/25
£'000 £'000
1,518 Balance at 1 April 1,524
6 Additions/ Disposals / Newly Classified 0
1,524 Balance at 31 March 1,524
Page 186

Page 75

Page 63
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
The models of ships, works of art, silver and commemorative ware, civic regalia and sewing machine collections are the
responsibility of the Libraries and Museums Service and accounts for approximately 90% of the overall collection with
the remaining 10% being recorded and accessioned into the collection on a regular basis in line with museum
accreditation. These works are held at the following locations: 
• Collections Store, Poplar Road
• Collections Store, Stanford Street
• Clydebank Town Hall. 
Models of Ships - include MV Rangitane, MV Essex and HMS Vanguard. 
Works of Art - there are 474 paintings within the works of art collection. 
Civic Regalia - predominately relates to the collection of provost robes and chains of office. It would be relatively rare
for the authority to purchase, or dispose of, items of civic regalia. 
Sewing Machine Collection - there are 813 sewing machines (of various models) included within the sewing machine
collection. 
Listed Buildings and Scheduled Ancient Monuments - the Council holds and maintains listed buildings and ancient
monuments of historic significance, many of which are tributes to the war dead. As well as memorial structures and
buildings, the Council maintains statues and fountains. 
Note 14 Assets Held for Sale
Assets held for sale are those where the carrying amount will be recovered principally through a sale transaction
rather than through continued use. Before an asset can be classified as held for sale, the following conditions must be
met: 
• the asset must be available for immediate sale in its present condition,
• the sale must be highly probable and an active programme to locate a buyer and complete the plan must have
been initiated,
• the asset must be actively marketed for sale at a price that is reasonable in relation to its current fair value,
• the sale should be expected to qualify for recognition as a completed sale within one year of the date of
classification. 
When these criteria are met, assets within the category of Property, Plant & Equipment will be reclassified to “Non-
Current Assets Held for Sale”. 
2023/24 2024/25
£'000 £'000
5,417 Balance at 1 April 2,743
0 Acquisitions 0
0 Assets newly classified as held for sale 252
0 Property, Plant and Equipment - Impairment 0
0 Revaluation Gains 0
(2,674) Disposals (1,851)
0 Assets declassified as held for sale* 0
2,743 As at 31 March 1,144
Page 187

Page 76

Page 64
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 15 Private Finance Initiatives and Similar Contracts 
Schools PPP Scheme and Long Term Liability (Design, Build, Finance and Maintain (DBFM) Scheme)
2024/25 was the sixteenth year of a thirty-year public private partnership for provision of three secondary schools and
one primary school in Clydebank and Alexandria. 2024/25 was the eighth year of a twenty-five year DBFM partnership
for the provision of one secondary school in Dumbarton. 
The Council has rights to use the schools for core educational purposes between agreed hours. The contract specifies
minimum standards for the services to be provided by the contractor, with deductions from the fee payable being made
if facilities are unavailable or performance is below the minimum standards. 
The partnership agreement was for the design, build, finance and operation of the schools which means that the
contractor took on the obligation to construct the schools and maintain them in a minimum acceptable condition and to
procure and maintain the plant and equipment needed to operate the schools. When the agreement ends, after thirty
years, unrestricted use and operation of the buildings will be handed back to the Council at nil cost. 
The Termination rights are in line with the market norms reflected in the Scottish Standard Schools Contract, as
approved by the Scottish Government, prior to financial close. 
15.1 Assets held under Schools PPP and DBFM Contracts
The construction costs of the five school buildings, adjusted for revaluations on 31 March 2024 and depreciation to
date are included as part of Operational Land and Buildings.
2023/24 2024/25
£'000 £'000
Cost or Valuation
124,419 At 1 April 136,063
Revaluations
11,600 To Revaluation Reserve 2,928
44 Additions
136,063 At 31 March 138,991
Accumulated Depreciation and Impairment
(1,793) At 1 April (74)
(2,943) Depreciation Charge (1,591)
Depreciation written out
3,972 To revaluation reserve 0
690 To Net Cost of Service 0
(74) At 31 March (1,665)
124,419 Opening Net Book value 135,989
135,989 Closing Net Book value 137,326 
15.2 Payments
The amounts payable to the PPP and DBFM operators each year is analysed into five elements:
• fair value of the services received during the year,
• finance cost – an interest charge on the outstanding Balance Sheet liability,
• contingent rent – increases in the amount to be paid for the property arising during contract,
• payment towards the liability – applied to write down the Balance Sheet liability towards the PPP contractor,
• lifecycle replacement costs – proportion of the amounts payable posted to the Balance Sheet as a prepayment
and then recognised as additions to property, plant and equipment when the relevant work is carried out. 
Payments remaining to be made under the PPP and DBFM contracts at 31 March 2025 (excluding any estimation of
inflation and availability/performance deductions) are as follows: 
Page 188

Page 77

Page 65
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Repayment of
Liability
Interest
Charges
Operating
Costs
Lifecycle
Replacement
Total Unitary
Payment
£'000 £'000 £'000 £'000 £'000
less than 1 year 4,346 4,263 6,041 1,898 16,548
2-5 years 17,060 21,592 21,096 8,352 68,100
6-10 years 26,450 31,308 19,135 12,728 89,621
11-15 years 31,327 30,506 7,436 13,222 82,491
16-20 years 3,670 1928 456 1,242 7,296
PPP Contractual Liability as
at 31 March 2025
82,853 89,597 54,164 37,442 264,056
Although the payments made to the contractor are described as unitary charge payments, they have been calculated to
compensate the contractor for the fair value of the services they provide, the capital expenditure incurred and interest
payable whilst the capital expenditure remains to be reimbursed. The liability outstanding to be paid to the contractor
for capital expenditure incurred is as follows: 
2023/24 2024/25
£'000 £'000
89,116 Opening Balance as at 1 April 86,443
(2,673) Repayments (3,590)
86,443
School finance Lease Liability
as at 31 March 82,853
Split:
3,590 Obligation payable within 1 year 4,346
82,853 Obligation payable after 1 year 78,508
86,443
School finance Lease Liability
as at 31 March 82,853
Note 16 Leases
16.1 Right of Use Assets - Council as Lessee
Leases which have substantially transferred to the authority the benefits and risks of ownership of a non-current asset,
are treated as if the asset had been purchased outright. Assets acquired under leases are included in non-current assets
at the lower of the fair value or the present value of the minimum lease payments. The capital element of the lease is
included as obligations under finance leases / creditors. The lease rentals comprise capital and interest elements. The
capital element is applied to reduce the outstanding obligation and the interest element is charged to revenue on a
straight-line basis over the terms of the lease.
The Council has adopted IFRS 16 from 1 April 2024, to recognise right of use assets.  IFRS 16 will mean that the
majority of leases where the Council act as lessee will come onto balance sheet. Right-of-use assets and lease liabilities
will have been calculated as if IFRS 16 had always applied but recognised in 2024/25 and not by adjusting prior year
figures.
A weighted average incremental borrowing rate of 4.33% has been applied to lease liabilities as at 1 April 2024.
The main impact of the new requirements is that, for arrangements previously accounted for as operating leases (i.e.
without recognising the leased vehicles, plant, equipment, property and land as an asset and future rents as a liability),
a right-of-use asset and a lease liability are now on the balance sheet at 1 April 2024. Leases for items of low value and
leases that expire on or before 31 March 2024 are exempt from the new arrangements. 
As a lessee, the Council has previously classified leases as operating or finance leases based on its assessment of
whether the lease transferred significantly all of the risks and rewards incidental to ownership of the underlying asset to
the Council. Under IFRS 16, the Council recognises right-of-use assets and lease liabilities for most leases. 
Page 189

Page 78

Page 66
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
The Council has decided to apply recognition exemptions to short-term leases and has elected not to recognise right-
of-use assets and lease liabilities for short term leases that have a term of 12 months or less and leases of low value
assets. The Council recognises the lease payments associated with these leases as an expense on a straight-line basis
over the lease term.
2024/25
£'000
Opening Balance as at 1 April 2024
Additions in Year 2,678           
Principal repaid in year (257)
derecognition
Value as at 31 March 2025 2,421           
Analysed by: £'000
Current 252               
Non-Current 2,168           
Lease Liabilities £'000
within one year 213               
Between 2 and 5 years 847               
Over 5 years 866               
Total Liabilities 1,926           
Amount charged to the Council Comprehensive Income and Expenditure amounted to £0.100m in 2024/25 related to
interest expense on the lease liabilities.
16.2 Operating Leases – Council as Lessee
The Council has adopted IFRS 16 from 1 April 2024.  Properties and other vehicles, plant and equipment that fall under
the scope of IFRS 16 have now been reclassified as right of use assets on the balance sheet (per 16.1).  the disclosures
below relate to low value (below £10,000 assets) and leases that have less than 12 months to run. 
31 March 2024 31 March 2025
£'000 £'000
800 Not later than one year 367
1,471 Later than one year and not later than five years 52
1,391 Later than five years 10
3,661 429
The expenditure charged to the appropriate service lines in the Comprehensive Income and Expenditure Statement
during the year in relation to these leases was £0.440m (2023/24 £0.950m). 
16.3 Operating Leases – Council as Lessor
Where the Council grants an operating lease over a property, the asset is retained in the Balance Sheet classed as an
operational asset in Note 11.  
Rental income received under operating leases is credited to the relevant service in accordance with the terms specified
in the lease agreement.
The Council leases out property under operating leases for the following purposes:
• For the provision of community services, such as sports facilities, tourism services and community centres,
• For economic development purposes to provide suitable affordable accommodation for local businesses. 
Page 190

Page 79

Page 67
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
The future minimum lease payment due under non-cancellable leases in future years are:
31 March 2024 31 March 2025
£'000 £'000
3,718 Not later than one year 3,023
10,446 Later than one year and not later than five years 10,773
124,873 Later than five years 128,857
139,037 142,654
The minimum lease payments receivable do not include rents that are contingent on events taking place after the lease
was entered into, such as adjustments following rent reviews. In 2024/25, £2.757m contingent rents were receivable by
the Council (2023/24 £2.819m).
Note 17 Debtors
£'000 £'000 £'000 £'000
16,529 Central Government Bodies 8,277
1,394 Scottish Government (including NHS bodies) 4,254
3,332 Other Local Authorities 856
8 Other Entities and Individuals 8
53,740 Council Tax receivable 66,323
(27,862) Impairment allowance for doubtful debt (39,126)
25,878 Council Tax (net of impairment) 27,198
26,836       Trade Debtors
Impairment allowance for doubtful debt
26,836 Other Debtors 26,895
73,977 Total Debtors 67,487
31 March 2024 31 March 2025
Note 18 Cash and Cash equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on notice of not
more than 24 hours. 
Cash equivalents are investments that mature in three months or less from date of acquisition and that are readily
convertible to known cash amounts, with insignificant risk of change of value. The investments comprise solely of short
term lending of surplus funds to a limited number of pre-approved UK banks and other local authorities. All deposits are
held in sterling. The carrying amount is the outstanding principal receivable. Bank balances are included in the Balance
Sheet at the closing balance in the Council’s ledger and include cheques payable not yet cashed. 
31 March 2024 Movement 31 March 2025
£'000 £'000 £'000
Net Bank Current Account* (4,779) (942) (5,721)
Short term deposits with UK banks 29,176 (15,227) 13,949
Net Cash and Cash equivalents 24,397 (16,170) 8,227
*A further breakdown of the bank account balances is noted below:
31 March 2024 31 March 2025
£'000 £'000
691 Bank current Accounts in balance 903
(5,469) Current Accounts in overdraft (6,624)
(4,778) (5,721)
Page 191

Page 80

Page 68
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Note 19 Creditors
31 March 2024 31 March 2025
£'000 £'000
8,701             Central government bodies 6,026             
17,036           Other local authorities 20,614           
4,958             Scottish Government including NHS Bodies 1,681             
Trade Creditors
33,672           Other Entities and individuals 34,028           
64,367           62,349            
Note 20 Provisions
VS/ER Legal
Litigations Other Total
£'000 £'000 £'000 £'000
Opening Provision as at 1 April 2023 3,412 16 3,428
Contributions in year 925 650 0 1,575
Amounts utilised in year (1,966) 0 0 (1,966)
Unutilised amounts reversed in year 0 0 0 0
Closing Provision as at 31 March 2024 2,371 650 16 3,037
Contributions in year 0 0 (16) (16)
Amounts utilised in year (2,051) 0 0 (2,051)
Unutilised amounts reversed in year (320) 0 0 (320)
Closing Provision as at 31 March 2025 0 650 0 650
Legal Litigation costs £0.650m This provision is for future legal costs as the Council is involved in an ongoing case that
will incur costs in future years. The provision is based on anticipated future costs.
Other Provisions £0.016m Intromission liability for historic abuse claims following reorganisation of Strathclyde regional
Council amounts agreed due from West Dunbartonshire Council to Glasgow City Council.
Compensation Payments – Voluntary Severance/Early Retirement (VS/ER) cost:  This provision has been released
unutilised and added to the ear-marked reserve for future voluntary severance/voluntary redundancy costs. 
Page 192

Page 81

Page 69
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 21 Financial Instruments
Categories of financial Instrument
Long Term Current Long Term Current
£'000 £'000 £'000 £'000
Debtors
1,774           49,395         Financial assets at amortised cost 2,021 67,487
Borrowing
460,953       273,907       Financial liabilities at amortised cost 469,167 334,602
Other long term liabilities
84,560         2,890           PPP and finance leases 78,508 4,346
Creditors
-               64,298         Financial liabilities at contract amount 0 62,349
31 March 202531 March 2024
Accounting regulations require the “financial instruments” (investment, lending and borrowing of the Council) shown on
the Balance Sheet to be further analysed into various defined categories. The investments, lending and borrowing
disclosed in the Balance Sheet are made up of the following categories of “financial instruments”:
Fair Value of Assets and Liabilities carried at Amortised Cost
Financial assets (represented by lending and receivables) and financial liabilities (represented by borrowings) and are
carried in the Balance Sheet at amortised cost. Fair values have been calculated with reference to the following: 
Financial Liabilities 
• PWLB Loans (Level 2) - For loans from the PWLB, premature repayment rates from the PWLB in force on 31
March 2024 have been applied to provide the fair value under PWLB debt redemption procedures. As the Debt
Management Office provides a transparent approach allowing the exit cost to be calculated without undertaking
a repayment or transfer it is appropriate to disclose the exit price. As an alternative, we have assessed the cost
of taking a new loan at PWLB new loan rates applicable to existing loans on Balance Sheet date (which could
be viewed as a proxy for transfer value). 
• Non-PWLB loans (Level 2) - For non-PWLB loans payable, the fair value of market loans are calculated using
estimated interest rates of 4.50% which is the average discount rate applied to market loans for calculation of
premature repayment. The fair value of local council loans are calculated using estimated interest rates of 0.70%
which is the average discount rate applied to local council loans for calculation of premature repayment.
Discount rates have been applied to provide the fair value under PWLB debt redemption procedures. 
• PFI/Finance leases (Level 3) – These are not the liability of the Council as the debt is held by the PFI/lease
provider. Fair value has been calculated at level 3 on a simple proxy basis. The same NPV methodology has
been applied as for PWLB and non-PWLB debt. 
Financial Assets 
• Fixed or variable short-term deposits of less than a year (including MMF's) – Where an instrument has a maturity
of less than 12 months or is a trade or other receivable the fair value is taken to be the carrying amount or the
billed amount. 
Policy Type Assets 
• Long term debtors – Level 2. 
Creditors 
• The fair value of trade and other receivables is taken to be the invoiced or billed amount. 
Transfers between Levels of the Fair Value Hierarchy 
• There were no transfers between input levels 1 and 2 or transfers in or out of level 3 during the year. 
Changes in the Valuation Technique 
• There has been no change in the valuation technique used during the year for the financial instruments: 
Page 193

Page 82

Page 70
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Carrying
Amount
Fair
Value
Carrying
Amount
Fair
Value
£'000 £'000 £'000 £'000
Debtors
51,169 51,169 Financial Assets at Amortised Cost1 69,509 69,509
Cash and Cash Equivalents
-          -          Cash and Cash Equivalents 0 0
Creditors
64,298 64,298 Financial liabilities at contract amount1 62,349 62,349
Borrowing
734,748 650,392 Financial liabilities2 803,769 677,918
Other Long Term Liabilities
84,560 109,315 PPP and Finance Lease Liabilities2 82,853 82,853
31 March 2024 31 March 2025
1 The fair value is equal to the carrying amount because all financial assets at amortised cost are either short term or at a fixed interest
rate or a variable rate linked to base rate without significant transaction costs. The Council does not hold any equity investments in
an unquoted market and, therefore, this type of investment is excluded from the above table. 
2 The fair value is higher than the carrying amount because the Council’s portfolio of loans includes a number of fixed rate loans
where the interest rate payable is higher than the rates available for similar loans at the balance sheet date. The commitment to pay
interest above current market rates increases the amount that the Council would have to pay if the lender requested or agreed to
early repayment of the loans. 
A further breakdown of types of borrowing held by the Council as at 31 March 2025 is noted below: 
Principal
outstanding
Accrued
interest / EIR
adjustment
Carrying
amount
Principal
outstanding
Accrued
interest / EIR
adjustment
Carrying
amount
£'000 £'000 £'000 £'000 £'000 £'000
60,152 3,821 63,973 PWLB 62,059 5,357 67,416
0 692 692 Mortgage loans 0 683 683
243,000 5,410 248,410 Local Authority 259,300 5,695 264,995
0 0 0 Lease Liability - IFRS 16 252 0 252
1,256 0 1,256 Other 1,257 0 1,257
304,408 9,923 314,331 Short Term Loans 322,868 11,735 334,603
347,492 0 347,492 PWLB 390,432 0 390,432
65,419 1,243 66,662 Mortgage loans 65,400 1,256 66,656
0 0 0 Local Authority 10,000 0 10,000
0 0 0 Lease Liability - IFRS 16 1,927 0 1,927
147 0 147 Other 152 0 152
413,058 1,243 414,301 Long Term Loans 467,911 1,256 469,167
31 March 2024 31 March 2025
Gains and Losses on Financial Instruments
The gains and losses recognised in the Comprehensive Income and Expenditure Account in relation to financial
instruments are made up as follows:
Financial Assets:
Loans &
receivables
Financial
Liabilities:
amortised
cost
Total
Financial Assets:
Loans &
receivables
Financial
Liabilities:
amortised
cost
Total
£'000 £'000 £'000 £'000 £'000 £'000
1,185 0 1,185 Interest (investment) 1,356 0 1,356
0
Interest payable and similar
charges
0 (26,467) (26,467) Interest/expense* 0 (40,756) (40,756)
0 151 151 (Gain)/Loss on de-recognition 0 5 5
1,185 (26,316) (25,131) Net (Gain)/loss in year 1,356 (40,751) (39,395)
31 March 2024 31 March 2025
* Interest/Expense has been calculated on an EIR basis where appropriate for market instruments. 
Page 194

Page 83

Page 71
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
There has been no gain/loss on either of the following classes of financial instruments, as the Council does not own
them:
•      available for sale financial assets
• financial assets or liabilities at a fair value through profit and loss.
Nature and Extent of Risks arising from Financial Instruments
The Council activities expose it to a variety of financial risks:
• Credit risk – the possibility that other parties might fail to pay amounts due to the Council.
• Liquidity risk – the possibility the Council might not have funds available to meet its commitments to make
payments 
• Market risk – he possibility that financial loss might arise for the Council as a result of changes in such measures
as interest rates and stock market movements. 
The Council’s management of treasury risks actively works to minimise the Council’s exposure to the unpredictability of
financial markets and implementing restrictions to minimise these risks. The procedures for risk management are set
out through a legal framework in the Local Government (Scotland) Act 2003 and the associated regulations. During
2024/25 these required the Council to comply with the CIPFA Prudential Code, the CIPFA Treasury Management in the
Public Services 
Code of Practice and the Local Government Investments (Scotland) Regulations 2010. Overall these procedures require
the Council to manage risk in the following ways:  
(i) by formally adopting the requirements of the Code of Practice
(ii) by the adoption of a Treasury Policy Statement and treasury management clauses within its financial
regulations/standing orders
(iii) by approving annually in advance prudential and treasury indicators for the following three years in limiting the
Council’s:
• overall borrowing.
• maximum and minimum exposures to fixed and variable rates.
• maximum and minimum exposures regarding the maturity structure of debt
• maximum annual exposure to investments maturing beyond a year.
(iv) by approving an investment strategy for the forthcoming year setting out its criteria for both investing and selecting
investment. 
These are required to be reported and approved prior to the start of the year to which they relate.  These items are
reported with the annual treasury management strategy which outlines the detailed approach to managing risk in relation
to the Council’s financial instrument exposure. Actual performance is reported to Members to assess the effectiveness
of controls established. 
The 2025/26 annual Treasury Management Strategy which incorporates the prudential indicators was approved by
Council on 26 March 2025 and is available on the Council website. The key issues within the strategy were:
• the authorised limit for 2025/26 was set by Council at that meeting at £865.206m.  This is the maximum limit of
external borrowing
• the operational boundary was expected to be £793.106m. This is the expected level of debt during the year
• the maximum amounts of fixed and variable interest rate exposure were set at 100% and 50% based on the
Council’s gross debt
• the maximum exposures to the maturity structure of debt is detailed with refinancing and maturity risk. 
The Council has fully adopted all required CIPFA Codes and statutory regulation currently in force, and maintains written
principles for overall risk management, as well as written policies and procedures covering specific areas such as credit
risk, liquidity risk, refinancing/maturity risk and market risk. 
Page 195

Page 84

Page 72
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Management of Credit Risk
Credit risk arises from the short-term lending of surplus funds to banks, building societies and other local authorities as
well as credit exposures to the Council’s customers. It is the policy of the Council to place deposits only with a limited
number of pre-approved UK banks and building societies whose credit rating is independently assessed as sufficiently
secure by the Council’s treasury advisers and to restrict lending to a prudent maximum amount for each institution. 
The Council’s maximum exposure to credit risk in relation to investments in banks and building societies of £13.949m
cannot be assessed on a general basis as the risk of any institution failing to make interest payments or repay principal
sums is specific to each individual institution, however, recent experience has shown that the institutions invested in at
the year-end are unlikely to default on their commitments. A risk of recoverability applies to all of the Council’s deposits
but there was no evidence at 31 March 2025 that this was likely to happen. 
The following analysis summarises the Council’s maximum exposure to credit risk on other financial assets, based on
past experience and current market conditions. 
Amount at 31
March 2025
Historical experience of non-
payment adjusted for market
conditions at 31 March 2025
Estimated maximum
exposure to default and
uncollectibility
£'000 % £'000
Customers and other income 70,090 8.55 1,346 
The Council does not hold any of the following in relation to financial assets:
• collateral as security in case of default of investment
• financial assets that would otherwise be past due or impaired but have been renegotiated. 
The Council does not generally allow credit for customers, however currently £10.971m is past its due date for
payment (2023/24: £15.431m). The past due amount can be analysed by age as follows: 
Total
£'000
Less than three months 3,883
Three to six months 1,067
Six months to one year 1,844
More than one year 9,052
Total 15,846
In general, provisions are made in accordance with Code Guidance, whereby a judgement is made regarding the
probability of collection for each category of debt. This judgement is based upon the past experience of collecting each
category of debt to calculate the appropriate percentage of each debt that may not be eventually recovered. It should
be noted that due to the limitations on the available age analysis of rent arrears, the bad debt provision of this debt is
based on the total value of the debt by tenant, and not by age past due.
No financial assets have been individually determined to be impaired and no collateral is held on past due or impaired
financial assets, therefore the Council has not obtained financial or non-financial assets during the financial year by
taking possession of any collateral or calling on other credit enhancements. 
Management of Liquidity risk 
The Council manages its liquidity position through the risk management procedures noted above (i.e. the setting and
approval of prudential indicators and the approval of the treasury and investment strategy reports), as well as through
a comprehensive cash flow forecast management system, as required by the CIPFA Code of Practice. This seeks to
ensure that cash is available when it is needed. 
The Council has ready access to borrowing from the Money Markets to cover any day-to-day cash flow need if required.
The Council is required to provide a balanced budget through the Local Government Finance Act 1992, which ensures
that sufficient funds are raised to cover annual expenditure. There is, therefore, no significant risk that the Council will
be unable to raise finance to meet its commitments under financial instruments.
Page 196

Page 85

Page 73
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Refinancing and Maturity Risk 
The Council maintains a significant debt portfolio and whilst the cash flow procedures above are considered against the
refinancing risk procedures, longer term risk to the council relates to managing the exposure to replacing financial
instruments as they mature. This risk relates to the maturing of longer-term financial liabilities. 
The approved treasury indicator limits for the maturity structure of debt are the key parameters used to address this risk
and the central treasury team address the operational risks within the approved parameters. This includes:
• monitoring the maturity profile of financial liabilities and amending the profile as appropriate through either new
borrowing or the rescheduling of the existing debt
• monitoring the maturity profile of investments to ensure that sufficient liquidity is available for the Council’s day-to-
day cash flow needs. 
The Council has safeguards in place to ensure that a significant proportion of its borrowing does not mature for
repayment at any one time in the future to reduce the financial impact of re-borrowing at a time of unfavourable interest
rates. No more than 50% of borrowings are due to mature within any financial year or within any rolling five-year period. 
The maturity analysis of financial liabilities is as follows:
Creditors PPP Borrowing Total
£'000 £'000 £'000 £'000
Less than one year 62,349 4,346 334,602 401,297
Between one and two years 9,431 5,000 14,431
Between two and five years 17,038 223,008 240,046
More than five years 52,038 241,159 293,197
62,349 82,853 803,769 948,971 
Management of Market risk
Changes in market interest rates influence the interest payable on borrowings and on interest receivable on surplus
funds invested. For example, a rise in interest rates would mean an increase in the interest charges on borrowing at
variable rates and an increased cost to the taxpayer. An increase in interest rates would also mean an increase in the
income received on lending at variable rates and a reduction in cost for the taxpayer. 
Changes in market rates also affect the notional “fair value” of lending and borrowing. For example, a rise in interest
rates would reduce the fair value of both lending and borrowing at fixed rates. Changes in the fair value of lending and
borrowing do not impact upon the taxpayer and are confined to prescribed presentational aspects in the Accounts. 
The Council has a variety of strategies for managing the uncertainty of future interest rates and the financial impact on
the Council: 
• it is the policy of the Council to limit its exposure to variable rate borrowing to a maximum of 50% of what it
borrows
• during periods of falling rates and where it is economically advantageous to do so, the Council will consider the
repayment and restructuring of fixed interest rate debt
• the Council takes advice from its specialist treasury advisers and actively monitors changes in interest rates to
inform decisions on the lending of surplus funds, new borrowings and restructurings of existing borrowings
• any potential for a financial impact on the Council is also significantly limited by the Scottish Government’s grant
distribution mechanism that automatically adjusts for changes in interest rates in the government grant support
the Council receives for “loan charges”. 
The interest rate profile of the Council’s borrowing is as follows: 
Page 197

Page 86

Page 74
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
£'000 %
Fixed Interest Debt 803,769 99.2      
Variable Interest Debt 6,625 0.8       
810,395
To illustrate the impact of changes in interest rates upon the Council, the following table shows the financial effect if
rates had been 1% higher at 31 March 2025, with all other variables held constant: 
Impact on tax payers and rent payers £'000
Increase on interest payable on variable debt borrowings 1
Increase in interest receivable on variable rate investments
Increase in government grant receivable for ‘loan charges’ (275)
Impact on Income and Expenditure Account (274)
Share of overall impact due credited to the HRA (127)
Other accounting presentational changes
Decrease in fair value of fixed rate debt borrowings (disclosure
confined to notes to the core financial statements) 7,594
The impact of a 1% fall in interest rates would be as above but with the changes being reversed. 
Management of Foreign Exchange Risk 
The Council does not lend or borrow in foreign currencies and has no exposure to gains or losses arising from
movements in exchange rates.  
Page 198

Page 87

Page 75
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Note 22 Defined Benefit Pension Scheme
As part of the terms and conditions of employment of its officers and other employees, the Council offers retirement
benefits. Although these benefits will not actually be payable until employees retire, the Council has a commitment to
make the payments that needs to be disclosed at the time that employees earn their future entitlement. 
The Council participates in the following pension schemes: 
The Local Government Pension Scheme - a defined benefit statutory scheme, operated as Strathclyde Pension
Fund, and administered by Glasgow City Council in accordance with the Local Government Pension Scheme (Scotland)
Regulations 1998. This is a funded scheme, meaning that the Council and employees pay contributions into a fund,
calculated at a level intended to balance the pensions liabilities with investment assets. The employer’s contribution rate
is set by the Fund actuaries following valuation. The employer contribution rate for 2024/25 was 6.5%, and 2025/26 is
set at 6.5%. In 2024/25, the Council paid an employer’s contribution of £8.747m (2023/24 £24.361m). 
The Teachers’ Pension Scheme (Scottish Teachers’ Superannuation Scheme (STSS) - a defined benefit
scheme administered by the Scottish Public Pension Agency. The scheme is technically a multi-employer defined benefit
scheme but is unfunded and the Scottish Government used a notional fund as the basis for calculating the employers’
contribution rate paid by local authorities. Due to the type of scheme, the Council is not able to identify its share of the
underlying financial position and performance of the scheme with sufficient reliability for accounting purposes. For the
purpose of this Statement of accounts, it is accounted for on the same basis as a defined contribution scheme. 
The employer pays a set contribution rate of 23% which is effective from 1 September 2019 and 2025/26 is set for
26%. This is charged directly to the revenue account for the Education service. The amount paid over in respect of
employer’s contribution was £13.347m (2022/23 £11.708m) and in respect of expenditure for teachers added years,
£0.056xxm payments were made (2023/24 £0.056m). 
The scheme is unfunded and all contributions (payable by members or employers) are paid to the Scottish Government,
and the Scottish Government then meets the costs of all the benefits. A specific amount is held by the Scottish
Government for this purpose. As a proportion of the total contributions into the Scottish Teachers Superannuation
Scheme 2024/15, the Council’s own contribution equates to 1.xx%. 
The Council is not liable to the scheme for any other entities obligations under the plan. 
Local Government Pension Scheme: 
Councils are required to disclose the capital cost of discretionary increases in pension payments agreed by the Council.
In 2024/25 the capitalised costs that would have arisen from the early retiral of the Council employees and from
predecessor authorities were as follows: 
£'000
2024/25 (5,596)
In earlier years 43,012      
Total 37,416      
The Council fully complies with the International Accounting Standard (IAS 19) concerning the disclosure of information
on the pension. IAS 19 states that although the pension benefits will not be paid until the employee retires, the Council
has a commitment to make these payments and must disclose the cost of this in its accounts at the time employees
earn their full entitlement. 
The Council therefore recognises the cost of the pension commitment within the Comprehensive Income and
Expenditure Account when the employees earn their pension entitlement rather than when the benefits are paid as
pensions. However, the cost to the taxpayer is calculated on the basis of pension contributions paid in the year, the cost
of retirement benefits under IAS19 is reversed out, to ensure there is no impact on the overall cost to be funded by
council tax and government grants.
Page 199

Page 88

Page 76
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
The following transactions have been made in the Comprehensive Income and Expenditure Account and Movement in
Reserves Statement during the year
2023/24 2024/25
£'000 £'000
Net cost of services
25,541 Current service cost 23,666
1,795 Past service cost 1,175
27,336 24,841
Financing and investment Income and Expenditure
(5,127) Net interest expense 2,377
22,209 Total post employment benefit charged to the Surplus
or Deficit on the provision of Services
27,218
(52,939) Expected return on assets 14,156
0 Actuarial gains and losses arising from changes in
demographic assumptions
(1,412)
(28,752) Actuarial gains and losses arising from changes in financial
assumptions
(126,100)
23,161 Actuarial gains and losses arising from experience
assumptions
(9,221)
(253,855) Change in the effect of the asset ceiling 2022-23 0
345,336 Change in the effect of the asset ceiling 2023-24 0
Change in the effect of the asset ceiling 2024-25 (361,912)
Change in the effect of the asset ceiling 2024-25 463,737
32,951 Total remeasurements recognised in other Comprehensive
Income
(20,752)
55,160 Total post employment benefit charged to the
comprehensive income and expenditure statement
6,466
Movement in Reserves Statement
(22,209) Reversal of gross charges made to surplus or deficit for post
employment benefits
(27,218)
27,538 Actual amount charged against the General Fund balance in
the year - employer contributions payable to Scheme
12,062
5,329 Reversal of gross charges made to surplus or deficit
for post employment benefits
(15,156)
The underlying assets and liabilities for retirement benefits attributable to the Council as at 31 March are as follows:
2023/24 2024/25
£'000 £'000
1,135,350 Fair value of plan assets 1,162,149
(833,026) Present value of defined benefit obligations (698,412)
(302,324) Asset ceiling adjustment (463,737)
0 Net assets in the Strathclyde Pension Fund 0
Present Value of Unfunded Liabilities
(20,793) LGPS Unfunded (20,125)
(18,167) Teachers’ pensions (17,291)
(4,052) Pre Local Government Reorganisation
(43,012) Net pension asset/(liability) (37,416) 
Page 200

Page 89

Page 77
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
The liabilities show the underlying commitments that the Council has in the long run to pay post-employment (retirement)
benefits. 
The amount included in the Balance Sheet arising from the Council’s obligation in respect of its defined benefit plans is
shown in the tables below. The net asset arising from the Council’s involvement in the defined benefit scheme totals
£463.737m at 31 March 2025. However the funded obligation has been limited to nil in line with the accounting
requirements of IFRIC 14 to limit the recognition of a pension asset to the extent to which the Council can recover the
benefits through either refunds or reduced contributions. As the Council is not able to withdraw from the scheme or
recover funds directly, the asset is therefore limited to the forecast reductions in contributions as compared to the
forecast future service costs. This has limited the recognition of the funded pension asset to nil. The Council has
continued to recognise the unfunded element of its pension liabilities as there are no scheme assets to cover the future
costs of these liabilities as they are due going forward. 
The Council’s Local Government Pension Scheme has a material surplus as at 31 March 2025. The Council accounts
for its pension fund using International Accounting Standards IAS 19. The surplus asset is to be determined as outlined
in IFRIC 14 based on the expected future reduction in accounting contributions. The fund remains open to new
employees therefore the potential future benefits have been measured in perpetuity. 
The fair value of plan assets has increased by £26.799m. This is mainly due to a lower than assumed investment returns
offset by an increase in the discount rate. 
The estimated liabilities have decreased by £97.198m, due to a decrease in the discount rate. 
Pension Assets and Liabilities
Liabilities have been valued on an actuarial basis using the projected unit method which assesses the future liabilities
of the fund discounted to their present value. The liabilities have been assessed by Hymans Robertson, an independent
firm of actuaries, contracted by Glasgow City Council to provide all IAS19 calculations on behalf of the councils within
the Strathclyde Pension Fund. The funded obligation is noted below: 
£'000 %
Active Members              336,705 47.1%
Deferred Members                66,952 9.4%
Pensioner Members              294,755 39.4%
Pre-Local Government Re-organisation Members                29,683 4.1%
728,095 100% 
The movement during the year on the defined obligation is noted as: 
Page 201

Page 90

Page 78
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
2023/24 2024/25
£'000 £'000
800,522 Opening balance 833,026
25,541 Current service cost 23,666
38,026 Interest cost 39,947
7,002 Contributions by Members 6,970
0 Actuarial gains/losses – change in demographic assumptions (1,412)
(28,752) Actuarial gains/losses – change in financial assumptions (126,100)
23,161 Actuarial gains/losses – other experience (9,221)
1,795 Past service costs/(gains) 1,175
(3,177) Estimated unfunded benefits paid (3,315)
(31,092) Estimated benefits paid (28,908)
833,026 Closing Balance as at 31 March 735,828 
The movement during the year on the fair value of the employer’s assets is: 
2023/24 2024/25
£'000 £'000
1,033,063 Opening balance 1,135,350
52,939 Expected return on assets (14,156)
0 Actuarial gains/ losses - other experience 0
49,077 Interest Income 54,146
7,002 Contributions by Members 6,970
24,361 Contributions by employer 8,747
3,177 Contributions in respect of unfunded benefits 3,315
(3,177) Estimated unfunded benefits paid (3,315)
(31,092) Estimated benefit paid (28,908)
1,135,350 Closing Balance as at 31 March 1,162,149 
The Council’s share of the pension fund asset at 31 March 2025 comprised: 
Quoted
prices in
Active
Markets
Prices not
quoted in
Active
Market
Total Quoted prices
in Active
Markets
Prices not
quoted in
Active
Market
Total
£'000 £'000 £'000 Asset Category £'000 £'000 £'000
229,305 249 229,554 Equity Securities 240,752 750 241,502
0 271,055 271,055 Private Equity 0 268,632 268,632
0 89,272 89,272 Real Estate 0 87,682 87,682
4,663 519,760 524,423 Investment funds and unit trusts 4,255 531,801 536,056
1,768 19,278 21,046 Cash and Cash Equivalent 0 28,277 28,277
235,736 899,614 1,135,350 Total 245,007 917,142 1,162,149
2023/24 2024/25
Assets are now held at bid value. 
Page 202

Page 91

Page 79
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25 
Asset and Liability Matching strategy
The main fund of Strathclyde Pension Fund does not have an asset and liability matching strategy (ALM) as this is used
mainly by mature funds. The Fund does match, to the extent possible, the types of assets invested to the liabilities in
the defined benefit obligation. As is required by the pensions and investment regulations, the suitability of various types
of investment has been considered, as has the need to diversify investments to reduce the risk of being invested into
narrow a range. The Fund invests in equities, bonds, properties and in cash. 
The Fund has now taken account of the national change to the Local Government Pension Scheme in Scotland such
as the new career average revalued earning scheme (CARE) for future accruals. 
The actuarial valuation states that assets held on the valuation date were sufficient to cover 158% (2023/24 136%) of
accrued liabilities at that date. 
The principal actuarial assumptions used at the Balance Sheet date are as follows: 
31 March 2024 31 March 2025
Long term expected return on assets
2.95% Pension increase rate 2.80%
3.65% Salary Increase rate 3.50%
4.75% Discount rate 5.80%
Mortality
Based on these assumptions, the average
future life expectancies at the age of 65 are:
19.4 Current pensioners – Men 19.3
22.0 Current pensioners - Women 22.0
20.0 Future pensioners – Men 19.9
23.8 Future pensioners - Women 23.7
The above excludes any net pension liability that the Council may have to contribute to in respect of the Joint Boards of
Partnership for Transport and Valuation. These costs are shown within each Joint Board’s Balance Sheet and the
Council may be required to make an increased constituent contribution in the years when the liability fails to be met. 
The principal risks to the Council of the scheme are the longevity assumptions, statutory changes to the scheme,
structural changes to the scheme (i.e. large-scale withdrawals from the scheme), changes to inflation, bond yields and
the performance of the equity investments held by the scheme. These are mitigated to a certain extent by the statutory
requirements to charge to the General Fund and Housing Revenue Account the amounts required by statute as
described in the accounting policies note. 
Sensitivity Analysis
In order to quantify the impact of a change in the financial assumptions used, the actuaries have calculated and
compared the value of the scheme liabilities as at 31 March 2025 on varying bases. The approach taken is consistent
with that adopted to derive at the IAS19 figures provided. To quantify the uncertainty around life expectancy, the
actuaries have calculated the difference in cost to the employer of a one-year increase in life expectancy. For sensitivity
purposes, this is assumed to be an increase in the cost of benefits of around 3% to 5%. In practice the actual cost of a
one-year increase in life expectancy will depend on the structure of the revised assumption (i.e. if improvements to
survival rates predominately apply at younger or older ages). 
The figures have been derived based on the membership profile of the Employer as at the date of the most recent
actuarial valuation. 
Page 203

Page 92

Page 80
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
The estimation of defined benefit obligation is sensitive to the actuarial assumptions. The sensitivity 
regarding the principal assumptions used to measure the schemes liabilities are set out below: 
Approximate % increase to
Employer Liability
Approximate monetary
Amount (£'000)
Real Discount Rate (0.1% decrease ) 2% 12,153
1 year increase in the member life expectancy 4% 29,433
Salary Increase Rate (0.1% increase) 0% 796
Pension Increase Rate (0.1% increase) 2% 11,682
The total contribution expected to be made to the Local Government pension scheme for 2025/26 is £7.653m
Note 23 Termination Benefits
A number of savings options have been agreed at Council budget meetings to balance the Council budget. A number
of these options were reliant on a reduction in the Councils establishment. The Council had forewarning of the level of
savings required to balance the budget and had previously asked all Council employees to express an interest in
voluntary redundancy. As a result of the budget savings options approved by the Council a number of employees had
their redundancy application accepted. 
Redundancy costs have been incurred in prior years in relation to the budget savings agreed. In each year, provision
was made within the financial year for the costs of all employees who had accepted redundancy or where redundancy
was probable as at 31 March ending that year, including accounting for costs for employees who confirmed redundancy
by 31 March but left or were leaving after this date. 
Termination costs for all Council employees who have accepted redundancy by 31 March 2025 are recognised in the
Exit Packages note in 2024/25, or in previous financial years. The total cost recognised in the Exit Packages note in
2024/25 is £1.707m for 45 employees and in 2023/24 was £1.901m for 65 employees. These costs are detailed further
in Table 8 of the Remuneration Report on page 30. 
The reduction in the staffing establishment includes posts from all services across the Council and reductions were in
line with the savings agreed by the Council. There will be further redundancy costs incurred as the Council is required
to make further savings to balance the budget in future years and the Council have earmarked monies from the loans
fund one-off reprofiling gain.
Note 24 Other Reserves
Reserves are created by appropriating amounts from the General Fund balance in the Movement in Reserves
Statement. When expenditure to be financed from a reserve is incurred, it is charged to the appropriate service within
the CIES. The reserve is then appropriated back into the General Fund balance in the Movement in Reserves Statement
so that there is no net charge against Council Tax for the expenditure. 
Usable Reserves 
Usable reserves are those that the Council is able to apply to fund expenditure or reduce taxation and comprise of both
capital and revenue reserves. Movement in the revenue reserves during the year are outlined in the Movement in
Reserves Statement, however, a summary is shown below 
31 March 2024 31 March 2025
£'000 £'000
15,371 General Services (12,463)
969 Housing Revenue Account (611)
213 Capital Grants and Receipts Unapplied 0
194 Other Reserves (242)
16,747 Total Usable Reserves (13,316)
Page 204

Page 93

Page 81
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
General Fund Revenue Reserve: The General Fund is held for services provided by the Council through Revenue
Support Grant funded through the Scottish Government and council tax. It excludes the Housing Revenue Account.
This reserve holds funds not yet spent. 
Housing Revenue Account Revenue Reserve: The Council is required by the Local Government and Housing Act
(Scotland) 1987 to keep a Housing Revenue Account (HRA) which records all revenue expenditure and income
relating to the provision of council dwellings and related services. This reserve holds funds not yet spent. 
Capital Receipts Reserves: Capital receipts from asset sales are retained within this Reserve and used to fund
planned capital expenditure. 
Capital Grant and Reserves Unapplied Reserve: Grants and other contributions given to the Council are retained
within this Reserve until all conditions agreed by the grant provider are satisfied. This Reserve is also used to fund
transformational projects from capital receipts. 
Capital Items Replacement Fund (Other): This reserve holds funds which are retained and used for the renewal or
repair of school non-current assets. 
Unusable Reserves:
Certain reserves are kept to manage the accounting process for non-current assets, financial instruments, retirement
and employee benefits and do not represent usable resources for the authority. These reserves are explained on the
following pages. 
Summary of Year-end Balances 
The total for Unusable Reserves in the Balance Sheet is made up of the following reserves:
Movement on balances - Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements for accounting
for the consumption of non-current assets and for financing the acquisition, construction or enhancement of those assets
under statutory provisions. 
31 March 2024 31 March 2025
£'000 £'000
219,601 Opening Balance 221,892
(33,641) Depreciation (34,435)
(5,397) Impairment (1,818)
0 Increase in Depreciation Caused by Revaluation 2,051
(2,832) Service concession adjustment (3,260)
(3,242) Disposal of Fixed Assets (3,492)
35,796 Government Grants Applied 21,249
(77) Capital Financed by Current Revenue (51)
11,684 Long Term Debt Payment 14,310
0 To/from other statutory reserves 0
221,892 Closing Balance 216,446  
Page 205

Page 94

Page 82
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Movement on Balances – Revaluation Reserve
The revaluation reserve contains the gains made by the Council arising from increases in the value of its property, plant
and equipment (and intangible assets).  The reserve contains only revaluation gains accumulated since 1 April 2007,
the date that the reserve was created. Accumulated gains arising before that date are consolidated into the balance on
the capital adjustment account.
31 March 2024 31 March 2025
£'000 £'000
175,725 Opening Balance 183,856
(12) Unrealised Gains on Revaluation of Assets 10,541
0 Impairments and Losses on Revaluation of Assets (1,978)
0 Write off revaluation Balance (Disposal) (2,051)
8,143 Depreciation due to Revaluation of Assets 0
183,856 Closing Balance 190,368 
Movement on Balances – Pensions Reserve
The pension reserve absorbs the timing differences arising from the different arrangements for accounting for post-
employment benefits and for funding benefits in accordance with statutory provisions.  The triennial review by the
Pension Fund in 2023 set employer’s contribution rates for the Council at 6.5% for the period 1 April 2024 to 31 March
2026 and 17.5% thereafter.  The Council accounts for postemployment benefits in the comprehensive income and
expenditure as the benefits are earned by employees accruing years of service, updating the liabilities recognised to
reflect inflation, changing assumptions and investment returns on any resources set aside to meet the costs. However
statutory arrangements require benefits earned to be financed as the Council makes employer’s contributions to pension
funds or eventually pays any pension for which it is directly responsible. 
31 March 2024 31 March 2025
£'000 £'000
(15,390) Opening Balance (43,012)
(19,032) Actuarial (Loss)/Gain (23,903)
24,361 Employer Contributions 8,747
(32,951) Reversal of IAS19 Entries 20,752
(43,012) Closing Balance (37,416)
Movement on Balances - Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on the General Fund
balance from accruing for compensated absences earned but not taken in the year e.g. annual leave entitlement
carried forward at 31 March.
31 March 2024 31 March 2025
£'000 £'000
(4,373) Opening Balance (4,537)
(164) Staff Accrual Movement (289)
(4,537) Closing Balance (4,826)  
Page 206

Page 95

Page 83
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Movement on Balances -   Financial instrument Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing difference arising from the different arrangements for
accounting for income and expenses relating to certain financial instruments and for bearing losses or benefiting from
gains per statutory provisions. The Council uses the account to manage premiums paid on the early redemption of
loans. Premiums are debited to the comprehensive income and expenditure statement when they are incurred but
reversed out of the general fund balance to the account in the movement in reserves statement. Over time, the expense
is posted back to the general fund balance in accordance with statutory arrangements for spreading the burden on
council tax. In the Council’s case, this period is the unexpired term that was outstanding on the loans when they were
redeemed. As a result, the balance on the account as at 31 March 2025 will be charged to the General Fund over the
next thirty-seven years. 
31 March 2024 31 March 2025
£'000 £'000
(11,797) Opening Balance (11,146)
612 Annual Write off of Premiums and Discounts 567
0 New Premiums and Discounts 0
39 Annual EIR Adjustment to Stepped Interest Instruments 30
(11,146) Closing Balance (10,549)
Note 25 Related Parties
The Council is required to disclose material transactions with related parties – bodies or individuals that have the
potential to control or influence the Council or to be controlled or influenced by the Council. Disclosure of these
transactions and balances allows readers to assess the extent to which the Council might have been constrained in its
ability to operate independently or might have secured the ability to limit another party’s ability to bargain freely with the
Council. 
The Scottish Government 
The Scottish Government has significant influence over the general operations of the Council, being responsible for
providing the statutory framework within which the Council operates. The Scottish Government also provides the
majority of the Council’s funding in the form of grants and prescribes the terms of many of the transactions that the
Council has with other parties (such as Council Tax bills and Housing Benefits). Grants received from the Scottish
Government are disclosed in Note 9 Taxation and Non-specific Grant Income on page 57. 
Elected Members Elected 
Members of the Council have direct control over the Council’s financial and operating policies. The total of members’
allowances paid in 2024/25 is shown within the Remuneration Report. There are no other significant related party
transactions with members of the Council. Elected Members are required to declare an interest if he or she believes
that there may be a perception that their decision making may be influenced in any way by a personal interest. Should
this arise, the relevant Member does not take part in any discussion or decision relating to that interest. The Register of
Interests of each Member is available on the Councils’ website: Councillors Allowances
Senior Officers 
Senior Officers, as listed within the Remuneration Report, are required to declare an interest if he or she believes that
there may be a perception that their decision making may be influenced in any way by a personal interest.  
Entities Controlled or Significantly Influenced by the Council 
The Council has entered into a number of transactions under subsidiaries, associates and other trading arrangements
deemed to be a related party mainly through the Council’s ability to exert influence over the entity through its
representation on the respective Boards. The relevant transactions with the bodies are detailed below. 
Page 207

Page 96

Page 84
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
Income
from
Related
Parties
Expenditure
to Related
Parties
Amounts
due to
Related
Parties
Amounts
owed by
Related
Parties
Income
from
Related
Parties
Expenditure
to Related
Parties
Amounts
due to
Related
Parties
Amounts
owed by
Related
Parties
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Subsidiaries
West Dunbartonshire Leisure Trust (105) 5,062 0 620 0 0 0 0
Clydebank Property Company (288) 0 0 288 0 0 0 0
West Dunbartonshire Energy LLP 0 537 0 1,754 0 0 0 0
Associates and Joint Ventures
Dumbartonshire and Argyll and Bute
Valuation Joint Board (123) 779 669 0 (142) 781 669 0
West Dunbartonshire Health & Social
Care Partnership (84,996) 84,996 0 0 (89,830) 89,830 0 0
Non-Material Interest in Other Entities 0 0 0 0 0 0
Strathclyde Partnership for Transport 0 2,259 0 0 0 2,366 0 0
Strathclyde Concessionary travel Scheme
Joint Board 0 166 0 0 0 165 0 0
Strathclyde Pension fund 0 29,451 105 0 0 16,081 (1,166) 0
Clydebank Municipal Bank (6) 0 0 (6) (5) 0 12 (5)
2023-2024 2024-2025
*Further details of these entities are disclosed in the group Accounts Note 30 Combining Entities.
Note 26 Agency Services  
Where the Council acts as an agent for another entity, transactions are not reflected in the Council’s financial statements,
with the exception of cash collected or expenditure incurred by the Council on behalf of the other entity, in which case
there is a debtor or creditor position in the balance sheet for amounts due or owed. 
The Council bills and collects Non-Domestic Rates on behalf of the Scottish Government. During 2024-25 the Council
collected £84.519 million and received £87.869 million to the Non-Domestic Rates pool (2023-24: £83.970 million and
£87.129 million). The Council also bills and collects domestic water and sewerage charges on behalf of Scottish Water
with the Council Tax. During 2024-25 the Council collected and paid over £17.578 million (2023-24: £15.614 million)
and is due to receive £0.815 million (2023-24: £0.294 million) for providing this service.
Note 27 Financial Guarantees
In terms of West Dunbartonshire Leisure Trust’s admission to the Strathclyde Pension Scheme, the Council has
guaranteed to accept liability for any unfunded pension costs should they cease to exist, withdraw from the Scheme or
become unable to meet any unfunded liability. The Council has not quantified the possible liability. 
Note 28 Contingent Assets and Liabilities
A contingent asset arises where an event has taken place that gives the Council a possible asset whose existence will
only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the control of the Council.
Contingent assets are not recognised in the Balance Sheet but disclosed in a note to the accounts where it is probable
that there will be an inflow of economic benefits. 
A contingent liability arises where an event has taken place that gives the Council a possible obligation whose existence
will only be confirmed by the occurrence or otherwise of uncertain future events, not wholly within the control of the
Council. Contingent liabilities also arise in circumstances where a provision would otherwise be made but either it is not
probable that an outflow of resources will be required or the amount of the obligation cannot be measured reliably.
Contingent liabilities are not recognised in the Balance Sheet but are disclosed as a note to the accounts, unless the
possibility of an outflow of resources embodying economic benefits or service potential is remote. 
The Council has a residual contingent liability relating to those workers who have yet to settle their pay protection claims.
Page 208

Page 97

Page 85
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2024/25
The Council has outstanding employment tribunals, if the Employees’ action is successful will result in a liability to the
Council. 
The Limitation (Childhood Abuse) (Scotland) Act 2017 Section 1 removes the limitation period for actions of damages
in respect of personal injuries resulting from childhood abuse. At this stage the extent of any potential liability is unknown. 
The Council has a potential contingent liability relating to the defined pension scheme.  In June 2023 the High Court
ruled in the Virgin Media Limited v NTL Pension Trustees II Limited (and others) case regarding the validity of
amendments to post 6 April 1997 benefits in formerly contracted-out defined benefit pension schemes. In a judgement
delivered on 25 July 2024, the Court of Appeal unanimously upheld the decision of the High Court. This ruling may have
a potential future impact on the Local Government Pension Scheme benefits as the Local Government Pension scheme
has made amendments since 1997 and these amendments did impact member benefits.  No adjustments have been
made to the financial statements, as it is not clear if the specific circumstances of the Council’s LGPS are relevant and
if the Pension Fund obtained the necessary documentation to support amendments at the time. Should this be the case,
the impact of the ruling has not yet been determined and would require significant investigation to quantify any potential
impact on the Council’s liabilities, and so is not quantifiable at this stage.  
The Council is not aware of any other contingent assets or liabilities which may be outstanding.
Note 29 Fees Payable to External Auditors
In 2024/25 the following fees relating to external audit and inspection were incurred alongside comparative figures for
2023/24: 
2023-24 2024-25
£'000 Auditor's Remuneration £'000
335
Fees payable to External Auditors with regard to external audit
services carried out by the appointed Auditor 341
335 Total Remuneration 341
The figure above includes fees for the audit of the Council’s charitable trusts. 
Forvis Mazars have been appointed as external auditors for 2024/25. Forvis Mazars did not undertake any non-audit
work in 2024/25.
Note 30 Events After the Balance Sheet Date
These are events, both favourable and unfavourable, that occur between the end of the reporting period and the date
when the Statement of Accounts is authorised for issue. An adjustment is made to the financial statements where there
is evidence that the event relates to the reporting period; otherwise the financial statements are not adjusted, and where
the amount is material, a disclosure is made in the notes. 
The Chief Officer - Resources issued the unaudited Statement of Accounts on 18 June 2025. There have been no
material events after the balance sheet date which necessitate revision of figures in the financial statements or notes
thereto including contingent assets or liabilities.
Page 209

Page 98

Page 86
Housing Revenue Account         
West Dunbartonshire Council Annual Accounts 2024/25
Housing Revenue Account
Movement on the Housing Revenue Account Statement
This statement shows the movement in the year on the Housing Revenue Account reserve. The surplus or (deficit) on
the housing revenue account income and expenditure statement is reconciled to the surplus or deficit for the year on
the housing revenue account balance, calculated in accordance with the Housing (Scotland) Act 1987. 
2023/24 2024/25
£'000 £'000
(2,635) Balance on the Housing Revenue Account as at 1 April (969)
(3,914) Total Comprehensive Income and Expenditure (2,035)
(52) Pension Scheme Adjustments (744)
6 Financial Instruments Adjustment 2
(12) Holiday Pay Adjustment 3
(2,296)
Reversal of entries included in the Surplus/Deficit on the Provision of Services in relation to
capital expenditure (6,948)
(2,354) Adjustments to the revenue resource (7,687)
0 Net gain or loss on sale of non-current assets 0
7,933 Statutory Repayment of Debt (Loans Fund Advances) 9,764
0 CFCR 0
7,933 Adjustments between Revenue and Capital Resources 9,764
5,579 Total Statutory Adjustments 2,077
0 Transfers (to)/from Other Statutory Reserves 0
1,666 (Increase)/Decrease in Year 358
(969) Balance on the Housing Revenue Account as at 31 March (611) 
Housing Revenue Account Income and Expenditure Statement
The HRA income and expenditure statement shows the economic cost in the year of providing housing services in
accordance with generally accepted accounting practices rather than the amount to be funded from rent and government
grants. The Council charges rent to cover expenditure in accordance with regulations; this may be different from the
accounting cost. The increase or decrease in the year, on the basis of which rents are raised, is shown in the Movement
on the HRA Statement.
2023/24 2024/25
£'000 £'000
Income
(46,789) Dwelling Rents (net of voids) (50,168)
(154) Other Rents (158)
(2,447) Other Income (2,642)
(49,390) (52,968)
Expenditure
15,788 Repairs and Maintenance 12,227
14,747 Supervision and Management 14,606
13,833 Depreciation and Impairment 14,862
358 Other Expenditure 214
44,726 41,909
(4,664)
Net Cost of Service as Included in the Council Comprehensive
Income and Expenditure Statement (11,059)
HRA Share of the Operating Income and Expenditure Included in the
Comprehensive Income and Expenditure Statement
(11,545) Recognised Capital Income (Grants, Contributions and Donations) (7,914)
0 Gain or Loss on the Sale of HRA Non Current Assets 0
11,483 Interest Payable and Similar Charges 15,504
1,004 Amortisation of Premiums and Discounts 1,174
(199) Impairment Loss - Debtors 260
HRA Interest and Investment Income
743 9,024
(3,921) (Surplus)/Deficit for the year on HRA Services (2,035)
Page 210

Page 99

Page 87
Housing Revenue Account         
West Dunbartonshire Council Annual Accounts 2024/25
Notes to the Housing Revenue Account Income and Expenditure Statement
Note 1 The number and types of dwellings in the council’s stock
The Council was responsible for managing 10,547 dwellings during 2024/25 (10,445 in 2023/24). The following shows
an analysis of these dwellings by type. 
2023/24 2024/25
Number at 31
March 2024
Average
weekly rent
Number at 31
March 2025
Average
weekly rent
£ Type of Dwelling £
2,745 84.92 Two-apartment 2,770 90.81
4,700 87.45 Three-apartment 4,733 93.39
2,633 92.54 Four-apartment 2,655 99.27
346 98.61 Five-apartment 359 107.87
14 116.98 Six-apartment 23 121.41
3 250.06 Seven-apartment 3 266.82
2 102.27 Eight-apartment 2 109.12
2 102.27 Nine-apartment 2 109.12
10,445 Total 10,547 
Note 2 Dwelling Rents
The £50.168m noted in the Income and Expenditure Statement is the total rental income less voids chargeable for the
year of £1.002m (£1.165m in 2023/24). The £50.168m excludes irrecoverable and bad debts.
Average rents were £94.80 per week in 2024/25 (£88.53 per week in 2023/24). 
Note 3 Other Rents
This is the total income received from travelling person site rentals, lockups and shops less voids chargeable for the
year, excludes irrecoverable and bad debts.  Lost rents from lockups in 2024/25 were £0.090m (£0.084m in 2023/24) 
Note 4 Rent arrears
As at 31 March 2025, total rent arrears amounted to £4.876m (2023/24 £4.641m). This is 9.72% of the total value of
rents due at 31 March 2025. It should be noted that the total arrears do not all relate to 2024/25. The year-on-year
movement in value of arrears is an increase of £0.235m. 
Note 5 Provision for Bad Debts
In the financial year 2024/25, the rental bad debt provision was increased by £0.488m in 2024/2025. (Increase of
£0.080m in 2023/2024). The total rental bad debt provision on 31 March 25 was £3.066m - equivalent of 63% (63%
2023/24) of the total value of rents due at that date.
Page 211

Page 100

Page 88
Council Tax Income Account                                   
West Dunbartonshire Council Annual Accounts 2024/25
Council Tax Income Account
The Council Tax Income Account shows the gross income raised from Council Taxes levied and deductions made under
statute.  The resultant net income is transferred to the Comprehensive Income and Expenditure Statement of the
Council.
2023/24 2024/25
£'000 £'000
59,405 Gross council tax 59,545
Less:
(9,084) Council Tax Reduction Scheme Discount* (9,141)
(7,503) Other discounts and reductions (7,381)
(771) Provision for bad and doubtful debts (731)
(1,249) Adjustments for prior years (591)
40,798 Transfer to General Fund 41,701
Dwellings are valued by the Assessor and placed within a valuation band ranging from the lowest “A” to the highest “H”.
The Council Tax charge is calculated using the Council Tax Base, Band D equivalent as below. This value is then
decreased or increased dependent upon the band of the dwelling. The charge for each band for 2024/25 was as follows:
2023/24 2024/25
£ per year £ per year
777.21 Band A* 777.21
932.65 Band A 932.65
1,088.10 Band B 1,088.10
1,243.54 Band C 1,243.54
1,398.98 Band D 1,398.98
1,838.10 Band E 1,838.10
2,273.34 Band F 2,273.34
2,739.67 Band G 2,739.67
3,427.50 Band H 3,427.50
Calculation of the Council Tax base
Band
No of
Dwellings
No of
Exemptions
Disabled
Relief
Discounts
25%
Discounts
50%
CTRS
Discount
Total
Dwellings
Ratio to
Band D
Band D
Equivalent
A(Disabled) 0 0 0 9 0 9 24 200/360 13
Band A 7,460 330 19 4,289 141 3,661 8,276 240/360 5,517
Band B 16,940 580 45 8,307 140 5,840 17,888 280/360 13,913
Band C 7,854 199 (13) 3,174 37 1,859 8,058 320/360 7,163
Band D 6,259 152 2 2,136 27 706 6,032 360/360 6,032
Band E 4,908 67 14 1,173 18 248 4,641 473/360 6,098
Band F 1,806 13 (42) 290 7 49 1,738 585/360 2,824
Band G 847 9 (12) 112 3 24 811 705/360 1,588
Band H 70 1 (11) 6 6 2 65 882/360 160
Band X 1 0 0 0 0 0 1 0/360 0
43,308
(523)
42,785
Provision for bad debt
Council Tax Base 
Discounts, Reliefs and Exemptions 
A council tax bill is reduced by 25% where a property has only one occupant or 50% where the property is empty. For
council tax purposes certain students are not regarded as occupants. Certain properties may also qualify for relief if the
property has been adapted for a disabled person. Properties undergoing major renovation or held pending demolition
may be awarded exemption from council tax.
Page 212

Page 101

Page 89
Non-Domestic Rate Income Account                                   
West Dunbartonshire Council Annual Accounts 2024/25
Non-Domestic Rates Income Account
The Non-Domestic Rate Income Account is an agent’s statement that reflects the statutory obligation for billing
authorities to maintain a separate Non-Domestic Rate Account. The statement shows the gross income from the rates
and deductions made under the Local Government (Scotland) Act 1975 as amended by the Local Government Finance
Act 1992 on non-domestic property. The net income is paid to the Scottish Government as a contribution to the national
non-domestic rate pool.
2023/24 2024/25
£'000 £'000
95,539 Gross rates levied 100,028
Less:
(9,621) Reliefs and other deductions (10,004)
(954) Provision for bad and doubtful debts (1,000)
84,964 Net non-domestic rate income 89,024
(942) Adjustments for prior years (3,848)
(53) Adjustments for prior years - bad debt (657)
83,969 Total Non Domestic Rate Income (before retention) 84,519
0 Non Domestic Rate Income Retained by the Council (BRIS) 0
83,969 Contribution to National Non Domestic Rate Pool 84,519
93,396 Distribution from National Non Domestic Rate Pool 87,481
(9,427) Net contribution to/(from) National Non Domestic Rate Pool (2,962)
93,396
Net Non Domestic Rate Income to Comprehensive Income &
Expenditure Statement 87,481 
The non-domestic rates pool operates on a cash accounting basis and as such the non-domestic rate income account
within the Council is calculated on a similar basis. 
Analysis of Rateable Values
Analysis of rateable Values: £
Rateable value at 1/4/24 183,115,070
Running roll (full year RV) (652,736)
Rateable value at 31/3/25 182,462,334
Less: partially exempt (732,885)
Less: wholly exempt (1,059,315)
Net rateable value at 31 March 2025 180,670,134
Non-Domentic Rate Charge
The amount paid for non-domestic rates is determined by the rateable value placed on the property by the Assessor
multiplied by the rate per £ announced each year by the government.
The national non-domestic rate poundage set by the First Minister for Scotland for 2024/25 was:
2023-24 2024-25
Pence Pence
49.8p Basic Property Rate per £ 49.8p
1.3p Suplementary Rate per £ for Properties between £51,000 and £100,000 4.7p
2.6p Suplementary Rate per £ for Properties over £100,000 6.1p 
Page 213

Page 102

Page 90
Common Good Fund                                             
West Dunbartonshire Council Annual Accounts 2024/25
Common Good Fund
The Council administers the Dumbarton Common Good Fund Account. The Fund is applied for the benefit of the people
of Dumbarton. The figures below summarise the income and expenditure for the year as well as the assets and liabilities
as at 31 March 2025. The fund does not represent assets of the Council and has not been included within the Balance
Sheet on page 33.   
Common Good Income and Expenditure Account for the year ended 31 March 2025
Usable
Reserves
Unusable
Reserves
Usable
Reserves
Unusable
Reserves
Revenue
Revaluation
Reserve Total Revenue
Revaluation
Reserve Total
£'000 £'000 £'000 £'000 £'000 £'000
408                   408         Gross Expenditure 522               522               
(320)                  (320)        Gross Income (322)             (322)             
88                     88           Cost of Service 200               200               
Interest Payable and Similar Charges
(24)                    (24)          Interest and Investment Income (7)                  (7)                  
(24)                    (24)          Financing and Investment Income and Expenditure (7)                  (7)                  
64                     64           (Surplus) or Deficit on Provision of Services 193               193               
Other Income and Expenditure
-                    (367)                    (367)        Unrealised gains on revaluation of land and buildings -                -                         -               
64                     (367)                    (303)        (Surplus)/Deficit for the Year 193               -                         193               
(625)                  (3,487)                 (4,112)    Balance on Reserves brought forward (561)             (3,854)                    (4,415)          
(561)                  (3,854)                 (4,415)    Balance on reserves carried forward (368)             (3,854)                    (4,222)          
2023/24 2024/25
Common Good Balance Sheet as at 31 March 2025
31 March 2024 31 March 2025
£'000 £'000
Non-current Assets
3,854 Investment properties 3,854
Current Assets
568 Investments – West Dunbartonshire Council 38
(5) Debtors 355
Current Liabilities
(2) Creditors falling due within one year (25)
4,415 Total assets 4,222
Funds
561 Capital Adjustment Account 368
3,854 General Fund 3,854
4,415 Total Funds 4,222 
Note to the Common Good
Note 1 Property, Plant and Equipment
2023-24 2024-25
£'000 £'000
Cost or Valuation
At 1 April 3,487                                   3,854                           
Disposals in year
Revaluation Adjustments 367                                      -                               
Other reclassifications
At 31 March 3,854                             3,854                      
At 31 March 3,854                             3,854                      
Other Land and Buildings
Page 214

Page 103

Page 91
Trust Funds                                                               
West Dunbartonshire Council Annual Accounts 2024/25
Trust Funds
The Council acts as sole or custodian trustee for a number of trust funds, which may be used for various purposes
depending on the terms of the Trust. In all cases, the funds do not represent assets of the Council and they have not
been included within the Balance Sheet on page 33. Under the provisions of the “2005 Act” and the “Accounts
Regulations” above, all registered charities in Scotland are required to prepare financial statements which must be
externally scrutinised. The trust funds below are registered, under one registration, with the Office of the Scottish Charity
Regulator. Management has reviewed the current arrangements for the trust funds to ensure the current arrangements
reflect the needs of the Council and ensure that all obligations are met. Responsibility for the compliance with the new
regulations was delegated to the Chief Officer - Resources. 
Receipt and Payment Account
(Surplus)/ (Surplus)/
Receipts Payments Deficit ReceiptsPayments Deficit
£'000 £'000 £'000 £'000 £'000 £'000
(4) 0 (4) Dunbartonshire Educational Trust Scheme 1962 (5) 6 1
0 Endowments amalgamated to form trust
(1) 0 (1) McAuley Prize for Mathematics (1) 0 (1)
0 Provide prizes for those studying maths & computing
(10) 0 (10) Alexander Cameron Bequest 1 6 7
0 To encourage and support one-off community activities in Clydebank
0 0 0 Dr A K Glen Fund 0 0 0
0 Provide outings for Pensioners resident in Dumbarton
(1) 0 (1) UIE Award (1) 0 (1)
For students studying apprenticeships or training in industry
(16) 0 (16) Total (6) 12 6
2023/24 2024/25
Statement of Balances as at 31 March 2025
01 April 2024 (Surplus)/deficit
for year 31 March 2025
Bank and Cash £'000 £'000 £'000
Dunbartonshire Educational Trust Scheme 1962 (97) 1 (96)
McAuley Prize for Mathematics (23) (1) (24)
Alexander Cameron Bequest (122) 3 (119)
Dr A K Glen Fund 0 0 0
UIE Award (26) (1) (27)
Total (268) 2 (266)  
Page 215

Page 104

Page 92
Group Comprehensive Income and Expenditure Statement                         
West Dunbartonshire Council Annual Accounts 2024/25
Group Comprehensive Income and Expenditure Statement 
This statement shows the accounting cost in year, of providing services in accordance with relevant International Financial Reporting Standards,
rather than the amount to be funded from taxation. The council raises taxation to cover expenditure in accordance with regulations; this may be different from the accounting
cost. The taxation position is shown in the Movement in Reserves Statement.   
2023/24 2023/24 2023/24 2024/25 2024/25 2024/25
Gross Gross Net Gross Gross Net
Expenditure Income Expenditure Expenditure Income Expenditure
£'000 £'000 £'000 Note £'000 £'000 £'000
Service
42,717 (40,042) 2,675 Resources 43,286 (44,946) (1,660)
5,334 (2,116) 3,218 Regulatory and Regeneration 9,848 (2,227) 7,621
12,306 (180) 12,126 People & Technology 12,328 (196) 12,132
15,161 (611) 14,550 Citizens, Culture and Facilities 15,176 (698) 14,478
149,835 (21,486) 128,349 Education, Learning and Attainment 149,724 (21,887) 127,837
30,761 (3,155) 27,606 Roads and Neighbourhood 31,058 (3,157) 27,901
12,632 (8,004) 4,628 Housing and Employability 12,646 (8,004) 4,642
(1,275) (391) (1,666) Miscellaneous Services (1,651) (441) (2,092)
211,473 (124,699) 86,774 Health and Social Care Partnership 211,515 (124,778) 86,737
2,401 0 2,401 Requisitions 2,401 0 2,401
44,646 (49,300) (4,654) Housing Revenue Account 43,703 (49,416) (5,713)
11706 (5,424) 6,282 Subsidiaries 10,671 (4,538) 6,133
537,697 (255,408) 282,289 Net Cost of Service 540,705 (260,288) 280,417
160
Other Operating Expenditure and (income) - (Gain)
/ loss on Disposal of non-current assets 306
29,662 Financing and Investment (Income) and Expenditure (Note 5) 30,125
(298,070) Taxation and Non-specific Grant Income (Note 6) (298,070)
14,041 (Surplus)/Deficit on Provision of Services 12,778
3,764
Share of other Comprehensive Income and
Expenditure of Associates and joint Ventures (9,113)
(13,088) (Surplus)/Deficit arising from revaluation of non-current assets (12,936)
0 (Surplus)/Deficit on revaluation of assets held at fair
value through other comprehensive income
0
32,951 Remeasurement of the net defined benefit pension liability 32,951
23,627 Other Comprehensive (Income) and Expenditure 10,902
37,668 Total Comprehensive (Income) and Expenditure 23,680
Page 216

Page 105

Page 93
Group Balance Sheet                                               
West Dunbartonshire Council Annual Accounts 2024/25 
Group Balance Sheet
The balance sheet shows the value, as at the balance sheet date, of the assets and liabilities recognised by the group.
The net assets (assets less liabilities) are matched by the reserves held. Reserves are reported in two categories
(Note 20 Other Reserves page 80 provides a further explanation). 
31 March 2024 31 March 2025
£000 Note £000
1,189,092 Property, Plant and Equipment 16 1,179,740
7,119 Investment Properties 7,199
952 Intangible Assets 17 952
2,046 Long Term Debtors 2,047
1,524 Heritage Assets 19 1,524
210 Long Term Investments 210
9,704 Investment in Associates & Joint Ventures 9,651
1,210,647 Long Term Assets 1,201,323
2,743 Asset Held for Sale 18 2,743
1,330 Inventories 1,330
74,590 Short Term Debtors 23 74,528
27,321 Cash and Cash Equivalents (net) 26 27,320
105,984 Current Assets 105,921
(65,027) Short Term Creditors 28 (64,910)
(2,637) Provisions (2,237)
(3,590) PPP 22 (2,890)
(266,429) Short Term Borrowing 27 (266,347)
(337,683) Current Liabilities (336,384)
(82,853) PPP and Finance Lease Liabilities 22 (84,560)
(461,006) Long Term Borrowing 27 (460,952)
(43,012) Net Pensions Liability 13 (43,012)
(5,317) Capital Grants Receipts in Advance 10 (5,317)
(2,544) Liabilities in associates (2,719)
(594,732) Long Term Liabilities (596,560)
384,216 Net Assets 374,300
Represented by:
(28,067) Usable Reserves MIR/30 (30,900)
(356,149) Unusable Reserves MIR/31 (343,400)
(384,216) Total Reserves (374,300)
Page 217

Page 106

Page 94
Group Movement in Reserves Statement                                                                                                     
West Dunbartonshire Council Annual Accounts 2024/25
Group Movement in Reserves Statement
This statement shows the movement in the year on the different reserves held by the group, analysed into ‘usable reserves’ (i.e. those that can be applied to fund expenditure or reduce local
taxation) and other reserves. The surplus or (deficit) on the provision of services line shows the true economic cost of providing the group’s services, more details of which are shown in the
Comprehensive Income and Expenditure Statement. These are different from the statutory amounts required to be charged to the General Fund balance and the Housing Revenue Account for
council tax setting and dwelling rent setting purposes. The net increase/decrease before transfer to earmarked reserves line shows the statutory general fund balance and housing revenue account
balance before any discretionary transfers to or from earmarked reserves undertaken by the Council.                                                                                                                                    
General
Fund
balance
HRA
Balance
Capital
Fund
Capital
Reserve
Capital
Grants and
Receipts
Unapplied
Account
Other
Reserves
Total
Usable
Reserves
Share of
Subsidiarie
s,
Associates
& Joint
Ventures
Usable
Group
usable
reserves
Unusable
Reserves
Share of
Subsidiarie
s,
Associates
& Joint
Ventures
Unusable
Group
Unusable
Resrves
Total
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
2024/25
Balance at 31 March 2024 Carried Forward (12,932) (700) 702 758 (3,154) (56) (15,382) (12,553) (27,935) (349,845) (6,437) (356,282) (384,217)
Movement in Reserve 2024/35
Total Comprehensive Expenditure and Income 16,422 (3,920) 0 0 0 12,502 4,058 16,560 20,015 0 20,015 36,575
Adjustments between accounting basis and funding basis
under regulations (Note 6) 2,824 5,586 0 (3,082) 0 5,328 0 5,328 (5,328) (279) (5,607) (279)
Net (Increase)/Decrease before Transfers to Other
Statutory Reserves 19,246 1,666 0 0 (3,082) 0 17,830 4,058 21,888 14,687 (279) 14,408 36,296
Transfers to/from other statutory reserves (3,009) 2,941 68 47 1 48
Closing Balance at 31 March 2025 3,305 966 702 758 (3,295) 12 2,448 (8,448) (6,047) (335,158) (6,715) (341,874) (347,873)
2023/24
Balance at 31 March 2023 Carried Forward (30,309) (2,635) 0 0 (72) (262) (33,278) (17,377) (50,655) (364,999) (6,230) (371,229) (421,884)
Adjustment to the statutory repayment of debt for service
concession arrangements - permitted flexability* 0 0 0 0 0
0
Opening Balance at 1 April 2023 (30,309) (2,635) 0 0 (72) (262) (33,278) (17,377) (50,655) (364,999) (6,230) (371,229) (421,884)
Movement in Reserve 2023/24
Total Comprehensive Expenditure and Income 16,955 (3,920) 0 0 0 13,035 4,719 17,754 20,015 0 20,015 37,769
Adjustments between accounting basis and funding basis
under regulations (Note 6) 2,357 5,586 0 (3,082) 0 4,861 105 4,966 (4,861) (207) (5,068) (102)
Net (Increase)/Decrease before Transfers to Other
Statutory Reserves 19,312 1,666 0 0 (3,082) 0 17,896 4,824 22,720 15,154 (207) 14,947 37,667
Transfers to/from other statutory reserves (1,935) 269 702 758 0 206 0 0 0 0 0 0 0
Closing Balance at 31 March 2024 (12,932) (700) 702 758 (3,154) (56) (15,382) (12,553) (27,935) (349,845) (6,437) (356,282) (384,217)
(15,382)
Council Usable Reserves
* See Accounting policy 21 and Note 22 of the financial statements for more information on the Service Concession Arrangement (SCA) flexibility 
Page 218

Page 107

Page 95
Group Cash Flow Statement                                   
West Dunbartonshire Council Annual Accounts 2024/25 
Group Cash Flow Statement
The cash flow statement shows the changes in cash and cash equivalents of the group during the reporting period. The
statement shows how the group generates and uses cash and cash equivalents by classifying cash flows as operating,
investing and financing activities. The amount of net cash flows arising from operating activities is a key indicator of the
extent to which the operations of the authority are funded by way of taxation and grant income or from the recipients of
services provided by the authority. Investing activities represent the extent to which cash outflows have been made for
resources which are intended to contribute to the Council’s future service delivery. Cash flows arising from financing
activities are useful in predicting claims on future cash flows by providers of capital (i.e. borrowing) to the group.
2023/24 Cash Flow Statement 2024/25 2024/25
£'000 £'000 £'000
Operating Activities
14,041 Net deficit on the provision of services 18,077
(39,038) Depreciation, amortisation and impairment (42,138)
(160) Net gain/loss on fixed assets (306)
5,329 Movement in pension liabilities 5,329
(39) Movement in inventories (39)
10,322 Movement in debtors 9,320
12,378 Movement in creditors and provisions 12,378
0 Other non-cash movements 0
(11,208)
Adjustments to net deficit on the provision of services for non-
cash movements (15,456)
(2,000) Financing movements (11,170)
35,796 Investing movements 35,796
33,796
Adjustments for items included in the net surplus/deficit on the
provision of services that are investing and financing activities 24,626
36,629 Net cash inflow from Operating Activities 27,247
89,723 Purchase of property, plant and equipment and intangible assets 89,723
(2,911) Proceeds from sale of property, plant and equipment and intangible assets 3,084
11 Movement on long term investments 11
(35,796) Other receipts from investing activities (35,796)
192 Group Investment Transactions 192
51,219 Net cash outflows from investing activities 57,214
(518,000) Cash receipts of short-term and long-term borrowing (518,000)
2,673 Repayment of PPP liabilities 2,672
409,314 Repayment of short-term and long-term borrowing 409,328
(106,013) Financing Activities (106,000)
(18,165) Net cash (inflow)/outflow from financing activities (21,539)
5,781 Cash and cash equivalents at the beginning of the reporting period 5,781
27,320 Cash and cash equivalents at the end of the reporting period 27,320
(21,539) Movement – (Increase)/ Decrease in Cash (21,539)
Reconciliation of Liabilities arising from Financing Activities
31 March 2024
Financing
Cash flows
Non-cash
adj to FIAA 31 March 2025
£'000 £'000 £'000 £'000
Long term Borrowing 460,952
Short term Borrowing 319,980
PPP Liability 89,115
870,047         -                 0 -                
Page 219

Page 108

Page 96
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2024/25
Note 31 - Details of Combining Entities
The notes required for the Financial Statements of the Council are disclosed separately in the preceding pages. 
Associates and Joint Ventures
Dunbartonshire and Argyll and Bute Valuation Joint Board was formed in 1996 at local government re-organisation
by an Act of Parliament. The Board maintains the electoral, council tax and non-domestic rates registers for the three
councils of West Dunbartonshire, East Dunbartonshire and Argyll and Bute. The Board’s running costs are met by the
three authorities, with surpluses and deficits on the Board’s operations also shared between the councils. In 2024/25,
the Council contributed £0.xxxm (2023/24 £0.796m) or 28.03% of the Board’s estimated running costs and its share of
the year end net asset of £0.xxxm (2022/23 £0.373m) is included in the Group Balance Sheet. Copies of its accounts
may be obtained from the Treasurer to the Valuation Joint Board, 16 Church Street, Dumbarton G82 1QL. 
The West Dunbartonshire Health & Social Care Partnership - the Public Bodies (Joint Working) Act (Scotland) 2014
sets out the arrangements for the integration of health and social care across the country. The Scottish Government
approved the Integration Scheme for West Dunbartonshire which details the ‘body corporate’ arrangement by which
NHS Greater Glasgow & Clyde Health Board and the Council agreed to formally delegate health and social care services
for adults and children (including criminal justice, social work services) to a third body, which is described in the Act as
an Integration Joint Board. The Integration Joint Board for West Dunbartonshire is known as the West Dunbartonshire
Health & Social Care Partnership Board (HSCP Board) and started operations on 1 July 2015. The Board’s running
costs are met by the two bodies mentioned above, with surpluses and deficits on the Boards operations also shared
between them. In 2024/25, the Council contributed £xx.xxxm (2022/23 £84.995m) towards estimated running costs and
its share of the year end net asset of £x.xxxm (2022/23 £9.327m) is included in the Group Balance Sheet. Copies of its
accounts may be obtained from the Chief Financial Officer to the Integration Joint Board, 16 Church Street, Dumbarton
G82 1QL. 
The Council’s share of its associates and joint ventures are as follows:
Dunbartonshires and
Argyll and Bute
Valuation Joint Board
West Dunbartonshire
Health & Social Care Total
£'000 £'000 £'000
2024/25
Surplus/ (Deficit) on   Operating Activities 0
Non Current Assets 0
Current Assets 0
Non Current Liabilities 0
Current Liabilities 0
2023/24
Surplus/ (Deficit) on   Operating Activities 59 (3,764) (3,705)
Non Current Assets 189 0 189
Current Assets 188 9,547 9,735
Non Current Liabilities (49) 0 (49)
Current Liabilities (4) (220) (224) 
Subsidiaries
West Dunbartonshire Leisure Trust was formed in December 2011 and started trading on 5 April 2012. The Trust is a
charitable company registered  in Scotland and provides leisure facilities  within  the  West  Dunbartonshire  area  to 
the  general  public  and  operates sports centres, leisure centres, swimming pools, halls and community education
centres owned by the Council. The Trust is paid a management fee by the Council for the provision of these services.
The Trust’s net asset at 31 March 2025 was £x.xxxm (2022/23 £2.628m net asset) and its surplus for the year was
£0.xxxm (2022/23 £0.573m). The accounts of the Trust are published separately and can be obtained from the Manager,
Leisure Trust Headquarters, Alexandria CE Centre, Alexandria, G83 0NU which is also the company’s principal place
of business.
Page 220

Page 109

Page 97
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2024/25 
Clydebank Property Company was part of a group organisation previously known as Clydebank Rebuilt which was a
pathfinder urban regeneration organisation, limited by guarantee and included a commercial letting company (industrial
units) and a registered charity (the Titan Trust). On 11 August 2014, following the transfer of the Titan Crane to the
Property Company, the Council bought the commercial letting company with a view to continuing its regeneration
objective. The Company’s net asset at 31 March 2025 was £3.128m (2022/23 £3.215m) and its surplus for the year
before payment of a dividend was £0.000m (2022/23 £0.371m). The accounts of the Company are published separately
and can be obtained from the Company’s Headquarters, Titan Enterprise, 1 Aurora Avenue, Queen’s Quay, Clydebank
G81 1BF which is also the Company’s principal place of business. 
West Dunbartonshire Energy Limited Liability Partnership is a company established in April 2021 and was Scotland’s
first large-scale water source heat pump district heating scheme. The ESCo is a Limited Liability Partnership (LLP)
structure and is 99.9% controlled by WDC, with 0.1% being owned by Clydebank Property Company. Following its first
year of inception, the Company has a net liability at 31 March 2025 of £x.xxxm (2022/23: £1.059m) funded as working
capital advance from the Council. Its deficit for the year was £0.xxxm (2022/23: £0.378m). The accounts of the Company
are published separately and can be obtained from the Company’s Headquarters, 16 Church Street, Dumbarton G82
1QE. 
Dumbarton Common Good is held in Trust by the Council. Although the council does not contribute to this fund
financially, it has been included within the Council’s Group through materiality by nature. Net usable spend in 2023/24
was £0.0xxm (2023/24 £0.064m net usable spend). 
Trust Funds are held in Trust by the Council. Although the Council does not contribute to these funds financially, they
have been included within the Council’s Group through materiality by nature. The net increase in funds of £0.005m
(2022/23: net decrease of £0.010m) for the Trust Funds. For the purposes of the Group Accounts, two Trust Funds
managed by the Council (Dunbartonshire Educational Trust and McAulay Prize for Mathematics Trust) have been
consolidated based on the Council’s share of the assets. Copies of the accounts may be obtained from West
Dunbartonshire Council, 16 Church Street, Dumbarton G82 1QL. 
The Council’s subsidiaries year end results are as follows:
West
Dunbartonshire
Leisure Trust
Clydebank
Property
Company
WD Energy
LLP
Common
Good
Trust
Funds Total
£'000 £'000 £'000 £'000 £'000 £'000
2024/25
Surplus/ (Deficit) on   Operating Activities 0
Non Current Assets 0
Current Assets 0
Non Current Liabilities 0
Current Liabilities 0
2023/24
Surplus/ (Deficit) on   Operating Activities (611) 230 (245) (64) 10 (680)
Non Current Assets 105 3,765 0 3,854 0 7,724
Current Assets 4,296 625 1,027 563 268 6,779
Non Current Liabilities 0 (790) (1,754) 0 0 (2,544)
Current Liabilities (1,812) (608) (198) (2) 0 (2,620)  
Page 221

Page 110

Page 98
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2024/25 
Note 32 – Non-Material Interest in Other Entities
The Council has an interest in a number of other organisations. The Council’s share of their net assets or liabilities is
not material to the fair understanding of the financial position and transactions of the Council. Accordingly, the Group
Accounts do not include these organisations. Under Accounting Regulations, the Council is required to disclose the
business nature of each organisation. 
Strathclyde Partnership for Transport is the statutory body responsible for formulating the public transport policy on
behalf of the 12 local authorities in the West of Scotland. In 2023/24, the Council contributed £x.xxxm (2023/24
£1.422m). 
Strathclyde Concessionary Travel Scheme Joint Board oversees the operation of the concessionary fares scheme
for public transport on behalf of the 12 local authorities in the West of Scotland. The costs of the scheme are funded
through requisitions from the 12 councils and by the Scottish Executive via a ‘section 70’ grant. In 2024/25, the Council
contributed £0.xxxm (2023/24 £0.166m). 
Scotland Excel is a joint committee established through Section 57 of the Local Government (Scotland) Act 1973. The
main purpose of the committee includes co-ordination of collaborative buying initiatives, representation of interests in
public sector contracts, and the development and operation of a centre of procurement expertise for Local Government
in Scotland. 
Hub West of Scotland is a public private Joint Venture development organisation established in 2012. They work with
the public sector partners to plan, design, build, and fund and maintain buildings in the most efficient and effective
manner delivering better value for money and ultimately improving public services. Hub West of Scotland comprises:
Hub West Territory Participants, Scottish Futures Trust and The Wellspring Partnership. 
Business Loans Scotland Ltd was formed in March 2017 with 27 Scottish local authorities full members, including
the Council, and the remaining five Scottish local authorities becoming associate members. In this respect, each
member local council provides a level of loan finance for companies in their area under Phase 1, augmented in Phase
2 by Scottish Growth Scheme and European Regional Development Funding (ERDF). 
Note 33 – Financial Impact of Consolidation
The effect of inclusion of the entities on the Group Balance Sheet is to increase reserves and net assets by £xx.xxxm
(2022/23 £19.031m) respectively representing the Council’s share of the realisable surpluses/deficits in these
organisations. The group account has an overall net asset of £xxx.xxxm (2022/23 £374.300m). 
Note 34 – Analysis of Material Items of Group Income and Expenditure 
The following table provides an analysis of the council’s share of the material amounts as a result of the inclusion of the
associates, joint ventures and subsidiaries. 
2023/24 2024/25
£'000 £'000
324 Valuation Joint Board
9,327 West Dunbartonshire Health & Social Care
2,589 West Dunbartonshire Leisure Trust
2,992 Clydebank Property Company
(925) WD Energy LLP
4,415 Common Good
268 Trust Funds
18,990 Total 0
Page 222

Page 111

Page 99
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2024/25 
Note 35 - Group Accounting Policies: Disclosure of differences with main
Statement of Accounting Policies
The financial statements in the Group Accounts are prepared in accordance with the accounting policies set out in Note
1 with additions and exceptions noted below: 
Group Income and Expenditure Account
Proceeds from disposal of fixed assets – profits and losses from the disposal of fixed assets are credited or debited to
the Group Income and Expenditure Account within the net cost of services. The proceeds are then appropriated out
after net operating expenditure. For those proceeds associated with the disposal of the Council’s assets, appropriation
is to the Group Reserves. For those proceeds associated with the disposal of associates’ assets, appropriation is to the
Group Income and Expenditure Reserve. 
Group Balance Sheet
Inventories – valuation methods vary slightly across the Group. The Council uses cost price basis. The difference in
valuation methods does not have a material impact on the results of the group given the levels of stock held within the
organisations; and 
Pensions – West Dunbartonshire Leisure Trust complies with the Financial Reporting Standard FRS102 concerning the
disclosure of information on pensions. There is no difference in the Profit and Loss Account by using this method in
comparison with IAS19 (which is used by other group entities) therefore there is no impact on the results of the group. 
Page 223

Page 112

Page 100
Independent Auditor’s Report 
West Dunbartonshire Council Annual Accounts 2024/25 
Independent Auditor’s report to the Members of west Dunbartonshire council
and the Audit Commission 
Audit Arrangements
Under arrangements by the Accounts Commission for Local Authorities, the auditor with the responsibility for the audit
of the accounts of West Dunbartonshire Council is: 
Tom Reid
Director
Forvis Mazars
100 Queen Street
Glasgow
G1 3DN 
Statement
The audit of the Council’s Accounts for 2024-25 is yet to be undertaken i.e. the figures are “subject to audit”.  The
certified Accounts will be presented to the Council for approval.  
Page 224

Page 113

Page 101
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2024/25
Accounting Period: The period of time
covered by the accounts, normally a period of
twelve months commencing on 1 April. The
end of the accounting period is the Balance
Sheet date.
Accruals: The concept that income and
expenditure are recognised as they are earned
or incurred, not as money is received or paid. 
Actuarial Gains and Losses (Pensions): For
a defined benefit scheme, the changes in
actuarial deficits or surpluses that arise
because events have not coincided with the
actuarial assumptions made for the last
valuation (experience gains and losses) or the
actuarial assumptions have changed. 
Asset: An item having value to the Council in
monetary terms. Assets are categorised as
either current or non-current. A current asset
will be consumed or cease to have material
value within the next financial year (e.g. cash
and stock). A non-current asset provides
benefit to the Council and to the Services it
provides for a period of more than one year. 
Associates: These are entities (other than a
subsidiary or a joint venture) in which the
Council has a participating interest or over
whose operating and financial policies the
Council is able to exercise significant influence. 
Audit of Accounts: An independent
examination of the Council’s financial affairs. 
Balance Sheet: A statement of the recorded
assets, liabilities and other balances at the end
of the accounting period. 
Capital Adjustment Account: This account
absorbs the timing differences arising from the
different arrangements for the consumption of
non-current assets and for financing the
acquisition, construction or enhancement of
those assets under statutory provisions. 
Capital Expenditure: Expenditure on the
acquisition of a non-current asset, which will be
used in providing services beyond the current
accounting period, or expenditure which adds
to and not merely maintains the value of an
existing non-current asset. 
Capital Financed from Current Revenue:
This is expenditure incurred in creating, acquiring or
improving assets where that expenditure is charged
directly to the revenue account.
Capital Financing: Funds raised to pay for
capital expenditure. There are various
methods of financing capital expenditure
including borrowing, leasing, capital receipts
and grants, and revenue funding. 
Capital Grants Unapplied Account: Holds
the grants and contributions received towards
capital projects for which the Council has met
the conditions that would otherwise require
repayment of the monies but which have yet to
be applied to meet expenditure. 
Capital Receipt: The proceeds from the
disposal of land or other non-current assets. 
CIES: The Comprehensive Income &
Expenditure Statement (CIES) shows the
accounting cost of providing services and
managing the Council during the year. It
includes, on an accruals basis, all of the
Council’s day-to-day expenses and related
income. It also includes transactions
measuring the value of non-current assets
actually consumed during the year and the real
projected value of retirement benefits earned
by employees during the year. The statement
shows the accounting cost in accordance with
generally accepted accounting practices,
rather than the cost according to the statutory
regulations that specify the net expenditure
that Councils need to take into account when
setting the annual Council Tax. The required
adjustments between accounting basis and
funding basis under regulations are shown in
the Movement in Reserves Statement. 
CIPFA: The Chartered Institute of Public
Finance and Accountancy (CIPFA) is one of
the major accountancy bodies in the United
Kingdom. It develops and sets accounting
standards for the public sector. 
Page 225

Page 114

Page 102
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2024/25
The Code: The Code of Practice on Local
Authority Accounting in the United Kingdom
(The Code) is the basis on which local authority
accounts are prepared. The Code is based on
European Union adopted International
Financial Accounting Standards (that are
primarily drafted for the commercial sector) and
where required it interprets and adapts these
standards to address all the accounting issues
relevant to local government in the UK. 
Community Assets: Assets that the Council
intends to hold in perpetuity, that have no
determinable useful life and that may have
restrictions on their disposal. Examples of
community assets are municipal parks. 
Consistency: The concept that the accounting
treatment of like items within an accounting
period and from one period to the next, are the
same. 
Contingent Liability: A contingent liability is
either • A possible obligation arising from past
events whose existence will be confirmed only
by the occurrence of one or more uncertain
event, not wholly within the Council’s control;
or A present obligation arising from past events
where it is not probable that a transfer of
economic benefits will be required, or the
amount of the obligation cannot be measured
with sufficient reliability. 
Creditor: Amounts owed by the Council for
work done, goods received or services
rendered within the accounting period, but for
which payment has not been made by the end
of that accounting period. 
Current Service Cost (Pensions): The
increase in the present value of a defined
benefit scheme’s liabilities, expected to arise
from employee service in the current period. 
Debtor: Amount owed to the Council for works
done, goods received or services rendered
within the accounting period, but for which
payment has not been received by the end of
that accounting period.
Defined Benefit Pension Scheme: Pension
schemes in which the benefits received by the
participants are independent of the
contributions paid and are not directly related
to the investments of the scheme.
Depreciation: The measure of the cost of
wearing out, consumption or other reduction in
the useful economic life of the Council’s non-
current assets during the accounting period,
whether from use, the passage of time or
obsolescence through technical or other
changes. 
Discretionary Benefits (Pensions):
Retirement awards, which the employer has no
legal, contractual or constructive obligation to
award and are awarded under the Council’s
discretionary powers. 
Employee Statutory Adjustment Account:
The Employee Statutory Adjustment Account
absorbs the difference that would otherwise
arise on the General Fund from accruing for
compensated absences earned but not taken
in the year e.g. annual leave entitlement
carried forward at 31 March. 
Entity: A corporate body, partnership, trust,
unincorporated association, or statutory body
that is delivering a service or carrying on a
trade or business with or without a view to
profit. It should have a separate legal
personality and is legally required to prepare its
own single entity accounts. 
Equity: The Council’s value of total assets less
liabilities. 
Events after the Balance Sheet Date: Events
after the Balance Sheet date are those events,
favourable or unfavourable, that occur
between the Balance Sheet date and the date
when the Annual Accounts are authorised for
issue. 
Exceptional Items: Material items which
derive from events or transactions that fall
within the ordinary activities of the Council and
which need to be disclosed separately by virtue
of their size or incidence to give fair
presentation of the accounts. 
Page 226

Page 115

Page 103
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2024/25
Fair Value: The fair value of an asset is the
price at which it could be exchanged for in an
arm’s length transaction, less where
applicable, any grants receivable towards the
purchase or use of the asset. 
Finance Lease: A lease that transfers
substantially all the risks and rewards of
ownership of a non-current asset to the lessee. 
Financial Instruments Adjustment Account:
The Financial Instruments Adjustment Account
absorbs the timing differences arising from the
different arrangements for accounting for the
income and expenses relating to certain
financial instruments, and for bearing losses or
benefitting from gains, per statutory provisions. 
General fund Balance: This contains the net
surplus on the provision of Council services
combined with balances from previous years
and any contributions from other funds made
during the year.
General Revenue Grant: A grant paid by the
Scottish Government to Councils, contributing
towards the general cost of their services. 
Going Concern: The concept that the Annual
Accounts are prepared on the assumption that
the Council (and its Associate bodies) will
continue in operational existence for the
foreseeable future. 
Government Grants: Grants made by the
Government towards either revenue or capital
expenditure in return for past or future
compliance with certain conditions relating to
the activities of the Council. These grants may
be specific to a particular scheme or may
support the revenue spend of the Council in
general. 
Gross Expenditure: This includes all
expenditure attributable to the service and
activity including employee costs, premises
and transport costs, supplies and services,
third party payments, support services and
depreciation
Gross Income: This includes grant income
and all charges to individuals and
organisations for the direct use of the Council’s
services. 
Heritage Asset: A tangible or intangible asset
with historical, artistic, scientific, technological,
geophysical or environmental qualities that is
held and maintained principally for its
contribution to knowledge and culture. 
IFRS: International Financial Reporting
Standards (IFRS) are a set of accounting
standards developed by the International
Accounting Standards Board (IASB) that is
becoming the global standard for the
preparation of public company financial
statements and has been extended into the
public sector in the UK. 43. Impairment A
reduction in the value of a non-current asset to
below its carrying amount on the Balance
Sheet. 
Infrastructure Assets: Non-current assets
belonging to the Council that cannot be
transferred or sold, on which expenditure is
only recoverable by the continued use of the
asset created. Examples are highways,
footpaths and bridges. 
Intangible Assets: An intangible (non-
physical) asset may be defined as such when
access to the future economic benefits it
represents are controlled by the Council. This
Council’s intangible assets are comprised
solely of computer software licenses. 
Interest Cost (Pensions): For a defined
benefit scheme, the expected increase during
the period of the scheme’s liabilities because
the benefits are one period closer to
settlement. 
Inventories: Items the Council has procured
and holds in expectation of future use.
Examples are consumable stores and raw
materials. 
Liability: A liability is where the Council owes
payment to an individual or another
organisation. A current liability is an amount
which will become payable or could be called
in within the next accounting period e.g.
creditors or cash overdrawn. A non-current
Page 227

Page 116

Page 104
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2024/25
liability is an amount which by arrangement is
payable beyond the next year, at some point in
the future, or is to be paid off by an annual sum
over a period of time. 
MiRS: The Movement in Reserves Statement
(MiRS) shows the movement in the year on the
different reserves held by the Council,
analysed into usable reserves (those reserves
that can be applied to fund expenditure or to
reduce taxation) and unusable reserves. 
National Non-Domestic Rates Pool: All Non-
Domestic Rates collected by local authorities
are remitted to the national pool and thereafter
distributed to Councils by the Scottish
Government. 
Net Carrying Value: The amount at which
non-current assets are included in the Balance
Sheet, i.e. their historical cost or current value
less the cumulative amounts provided for
depreciation. 
Non-current Assets: non-current Assets are
not expected to be realised within 12 months
and are held to provide future economic benefit
to the Council.
Operating Leases: A lease where the
ownership of the non-current asset remains
with the lessor.
Past Service Cost (Pensions): For a defined
benefit scheme, the increase in the present
value of the scheme’s liabilities relating to
employee service in prior periods arising in the
current period as a result of the introduction of,
or improvement to, retirement benefits. 
Pension Reserve: The Pension Reserve
recognises the Council’s share of the actuarial
gains and losses in the Strathclyde Pension
Fund and the change in the Council’s share of
the net liability chargeable to the CIES. 
Pension Scheme Liabilities: The liabilities of
a defined benefit pension scheme for
outgoings due after the valuation date. The
scheme’s liabilities, measured using the
“project unit method”, reflect the benefits that
the employer is committed to provide for
service up to the valuation date.
Post-Employment Benefits: All forms of
consideration given by an employer in
exchange for services rendered by employees
that are payable after the completion of
employment e.g. pensions in retirement
Prior Year Adjustment: Material adjustments
applicable to previous years arising from
changes in accounting policies or from the
correction of fundamental errors. This does not
include normal recurring corrections or
adjustments of accounting estimates made in
prior years. 
Provision: An amount put aside for future
liabilities or losses which are certain or very
likely to occur but the amounts or dates of
when they will arise are uncertain.
Public Works Loan Board (PWLB): A
Central Government Agency which provides
loans for one year and above to Councils at
interest rates based on those at which the
Government can borrow itself. 
Rateable Value: The annual assumed rental of
land or property, which is for national Non-
Domestic Rates purposes.
Related Parties: Bodies or individuals that
have the potential to control or influence the
Council or to be controlled or influenced by the
Council. For the Council’s purposes related
parties are deemed to include the Elected
Members, the Chief Executive and its
Corporate Directors. 
Remuneration: All sums paid to or receivable
by an employee and sums due by way of
expenses or allowances (as far as these sums
are chargeable to UK income tax) and the
monetary value of any other benefits received
other than in cash.
Reserves: The accumulation of surpluses,
deficits and appropriation over past years.
Reserves of a revenue nature are available
and can be spent or earmarked at the
discretion of the Council. Some capital
Page 228

Page 117

Page 105
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2024/25
reserves such as the Revaluation Reserve
cannot be used to meet current expenditure. 
Residual Value: The net realisable value of an
asset at the end of its useful life. 
Revaluation Reserve: Records unrealised
gains arising since 1 April 2007 on the
revaluation of fixed assets not yet realised
through sales. 
Revenue Expenditure: The day-to-day
expenses of providing services. 
Short-term Borrowing: Money borrowed
where repayment is due in the following
financial year. 
Significant Interest: The reporting authority is
deemed to have Significant Interest if it is
actively involved and is influential in the
direction of an entity through its participation in
policy decisions. 
Unusable Reserves: Reserves which hold
unrealised gains and losses where amounts
would only become available to provide
services if the assets are sold and reserves
that hold a timing differences.
Usable reserves:  Those reserves which the
Council may use to provide services, subject to
the need to maintain a prudential level of
reserves and any statutory limitations on their
use.
Trust Funds: Funds administered by the
Council for such purposes as awards and
specific projects. Some of the Council’s Trust
Funds are Charities. 
Useful Economic Life: The period over which
the local authority will derive benefits from the
use of a non-current asset. 
Page 229

Page 118

Page 230

Page 119

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
SUMMARY
PERIOD END DATE 31 March 2025
Total Budget Actual Spend Annual RAG
Status
Use of Earmarked
Reserves
Variance after
the use of
Earmarked
Reserves
£000 £000 £000 % £000 £000
Resources 4,167 5,676                    1,509 36.2%  595 914
Regulatory and Regeneration 4,281 3,814                    (467) -10.9%  81 (548)
People & Technology 9,974 9,975                    1 0.0%  41 (40)
Citizens, Culture and Facilities 13,602 13,684                  82 0.6%  3 79
Education, Learning and Attainment 137,874 137,254                (620) -0.4%  512 (1,132)
Roads and Neighbourhood 15,348 17,393                  2,045 13.3%  335 1,710
2,408 3,049                    641 26.6%  297 344
Miscellaneous Services 7,759 5,336                    (2,423) -31.2%  0 (2,423)
Loan Charges 20,282 21,368                  1,086 5.4%  0 1,086
Capital Receipts used to fund Loan Charges (2,884) (1,862) 1,022 -35.4%  0 1,022
Requisition (VJB) 782 782                       0 0.0%  0 0
Requisition (SPT) 1,588 1,587                    (1) -0.1%  0 (1)
Requisition (HSCP) 89,342 89,830                  488 0.5%  0 488
Non GAE Allocation (9,055) (8,555) 500 -5.5%  0 500
Total Expenditure 295,469 299,331                3,863 1.3%  1,865 1,998
Council Tax (40,920) (41,701) (781) 1.9%  0 (781)
Revenue Support Grant (161,736) (161,736) 0 0.0%  0 0
Non Domestic Rates (87,481) (87,481) 0 0.0%  0 0
Service Concessionary Benefit (3,259) (3,259) 0 0.0%  0 0
Budgeted Use of Reserves (9,343) (9,343) 0 0.0%  0 0
Strategy to rebuild reserves 0 0 0 0.0%  0 0
Transfer SPFO reduction to Reserves 7,270 7,270 0 0.0%  0 0
Total Resources (295,469) (296,250) (781) 0.3%  0 (781)
Net Expenditure (0) 3,081 3,081 1.0%  1,865 1,217
Department Summary Variance
Housing and Employability
Page 231

Page 120

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
RESOURCES SUMMARY
PERIOD END DATE 31 March 2025
Total
Budget Actual Spend Annual
RAG Status
Use of Earmarked
Reserves
Variance after the use
of Earmarked
Reserves
£000 £000 £000 % £000 £000
19 221 202 1056%  0 202
1,490 1,688 198 13%  183 15
2,201 2,173 (29) -1%  0 (29)
2,350 2,405 55 2%  66 (11)
467 444 (23) -5%  0 (23)
6 (17) (24) -372%  11 (35)
(823) (1,128) (304) 37%  0 (304)
1,132 1,226 95 8%  198 (103)
(2,675) (1,325) 1,349 -50%  137 1,212
0 (11) (11) 0%  0 (11)
4,167 5,676 1,509 36%  595 914Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Corporate Asset Maintenance
Office Accommodation
Corporate Assets
Variance
Service Summary
Service / Subjective Summary
Finance Business Centre
Audit
Revenues & Benefits
Page 232

Page 121

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 March 2025
Total
Budget Actual Spend Annual
RAG Status
Use of Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
£000 £000 £000 % £000 £000
781            696                (85) -11%  0 (85)
616            543                (73) -12%  0 (73)
(226) (211) 15 -7%  0 15
884            796                (88) -10%  0 (88)
566            379                (187) -33%  8 (195)
569            529                (40) -7%  0 (40)
Economic Development 1,091         1,082             (9) -1%  73 (82)
4,281         3,814             (467) -11%  81 (548)
Democratic and Registration Service
Legal Services
Licensing
Environmental Health
Planning
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Procurement
Page 233

Page 122

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 March 2025
Total
Budget
Actual
Spend
Annual
RAG Status
Use of Earmarked
Reserves
Variance after the use
of Earmarked
Reserves
£000 £000 £000 % £000 £000
850 837 (13) -2%  0 (13)
1,814 1,845 30 2%  26 4
4,767 4,741 (25) -1%  0 (25)
Central Administration Support 2,543 2,537 (6) 0%  0 (6)
0 15 15 0%  15 0
9,974 9,975 1 0%  41 (40)
Variance
Total Net Expenditure
Transactional Services
Provision for Legal Fees & Settlements
Information Services
Strategic People and Change
Service / Subjective Summary
Service Summary
Page 234

Page 123

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 March 2025
Total Budget Actual
Spend
Annual
RAG Status
Use of Earmarked
Reserves
Variance after the use
of Earmarked Reserves
£000 £000 £000 % £000 £000
283 254 (29) -10%  0 (29)
1,382 1,354 (27) -2%  0 (27)
237 227 (10) -4%  0 (10)
Clydebank Town Hall 319 273 (46) -14%  0 (46)
Libraries 1,726 1,726 (0) 0%  0 (0)
Arts and Heritage 296 175 (121) -41%  3 (124)
Catering Services 4,732 5,102 370 8%  0 370
Building Cleaning 1,875 1,877 2 0%  0 2
Building Cleaning PPP (188) (188) (0) 0%  0 (0)
Facilities Assistants 2,410 2,278 (131) -5%  0 (131)
Facilities Management 504 558 54 11%  0 54
Communities 0 0 0 0%  0 0
Events 27 48 21 79%  0 21
13,602 13,684 82 1%  3 79
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy
Page 235

Page 124

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 March 2025
Total
Budget
Actual
Spend
Annual
RAG Status
Use of Earmarked
Reserves
Variance after the use
of Earmarked Reserves
£000 £000 £000 % £000 £000
Primary Schools 34,331 33,973 (358) -1%  107 (465)
Secondary Schools 35,524 35,165 (359) -1%  0 (359)
Specialist Educational Provision 21,562 21,997 435 2%  0 435
Psychological Services 725 663 (62) -9%  0 (62)
Sport Development / Active Schools 627 627 0 0%  0 0
Early Education 18,913 18,442 (472) -2%  0 (472)
PPP 18,082 18,059 (23) 0%  0 (23)
Creative Arts 640 595 (45) -7%  0 (45)
Curriculum for Excellence 66 50 (15) -23%  0 (15)
Central Admin 868 1,017 149 17%  103 46
Workforce CPD 314 303 (11) -4%  0 (11)
Performance & Improvement 463 463 0 0%  0 0
Education Development 2,398 2,404 7 0%  217 (210)
Raising Attainment - Primary 0 0 0 0%  0 0
Leisure Management 3,364 3,498 134 4%  85 49
Raising Attainment - Secondary 0 0 0 0%  0 0
Pupil Equity Fund (including LAC PEF) 0 0 0 0%  0 0
137,874 137,254 (620) 0%  512 (1,132)
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure
Page 236

Page 125

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 March 2025
Total
Budget
Actual
Spend
Annual
RAG Status
Use of Earmarked
Reserves
Variance after the use of
Earmarked Reserves
£000 £000 £000 % £000 £000
Transport, Fleet & Maintenance Services (779) (613) 166 -21%  0 166
Roads Services 2,583 3,284 701 27%  325 376
Grounds Maintenance & Street Cleaning Client 7,414 7,324 (90) -1%  0 (90)
Outdoor Services 206 347 141 68%  10 131
Burial Grounds (296) (185) 111 -37%  0 111
Crematorium (1,229) (983) 246 -20%  0 246
Waste Services 9,004 9,636 632 7%  0 632
Depots 0 (0) 0 0%  0 0
Capital Investment Programme 28 5 (23) -82%  0 (23)
Consultancy Services 816 735 (81) -10%  0 (81)
Ground Maintenance & Street Cleaning Trading A/c (2,399) (2,158) 241 -10%  0 241
15,348 17,393      2,044 13%  335 1,709
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure
Page 237

Page 126

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 March 2025
Total
Budget
Actual
Spend
Annual
RAG Status
Use of
Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
£000 £000 £000 % £000 £000
Working 4 U 1,970 1,999 29 1%  297 (268)
Shared Prosperity Fund 0 (0) (0) 0%  0 0
Homeless Persons 639 687 48 8%  0 48
Private Sector housing 15 11 (4) -27%  0 (4)
Private Sector Housing Grants 41 40 (1) -2%  0 (1)
Housing Maintenance Trading A/c (589) 0 589 -100%  0 589
Housing Asset and Investment 0 0 0 0%  0 0
Anti Social Behaviour 332 312 (20) -6%  0 (20)
2,408 3,049 641 27%  297 344
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 238

Page 127

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
MISCELLANEOUS
PERIOD END DATE 31 March 2025
Total
Budget
Actual
Spend
Annual
RAG Status
Use of Earmarked
Reserves
Variance after the use
of Earmarked
Reserves
£000 £000 £000 % £000 £000
5,987 3,591        (2,396) -40%  0 (2,396)
648 622           (26) -4%  0 (26)
1,124 1,123        (1) 0%  0 (1)
7,759 5,336        (2,423) -31%  0 (2,423)
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
Service Summary
Sundry Services
Members Allowances, etc
Page 239

Page 128

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
Audit 19 221 202 1056% 
Service Description
Main Issues / Reason for Variance
Finance 1,490 1,688 198 13% 
.
Main Issues / Reason for Variance
Revenues & Benefits 2,350 2,405 55 2% 
Service Description
Main Issues / Reason for Variance
Office Accommodation 1,132 1,226 95 8% 
Service Description
Main Issues / Reason for Variance
Cost of Collection of Council Tax (823) (1,128) (304) 37% 
Service Description
Main Issues / Reason for Variance
Corporate Assets (2,675) (1,325) 1,349 -50% 
Service Description
Main Issues / Reason for Variance
This service collects Council tax from local residents. The services also provides
support and advice to those residents regarding council tax.
A higher than anticipated favourable income outturn from Statutory Additions.
This service provides asset and estate management
The reason for this overspend is due an increase in the level of property repairs
and maintenance required of £740k. The remaining balance (£609k) relates to an
underrecovery in rental income which is partly funded from the use of the
smoothing fund (£137k).
The main reason for this adverse variance relates to cost of living project spend
on payments to other bodies which will be covered by an earmarked balance
(£66k).
Provision of Shared Office Accommodation.
The adverse variance relates to a budget savings of £198k carried from 23-24
budget that wasn't realised. This shortfall is being covered by the Smoothing
Fund.
The service provided by this area deals with Accountancy, Capital, Treasury,
Reconciliations, Cash Office and Municipal Bank
The main reason for this adverse variance relates to cost of living project spend
on payments to other bodies which will be covered by an earmarked balance
(£183k).
The service provided by this area deal with benefits, council tax and debt
recovery.
31 March 2025
Budget Details
Variance Analysis
Variance
Resources
Internal audit of council services.
The main reason for this adverse variance (£0.250m) is in relation to the internal
audit council tax fraud detection target. Any additional income collected is shown
as part of the favourable variance within the council tax resources budget and
therefore is not recognised within the service income.
Page 240

Page 129

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Democratic and Registration Service 781 696 (85) -11% 
Service Description
Main Issues / Reason for Variance
Environmental Health 616 543 (73) -12% 
Service Description
Main Issues / Reason for Variance
Legal Services 884 796 (88) -10% 
Service Description
Main Issues / Reason for Variance
Planning 566 379 (187) -33% 
Service Description
Main Issues / Reason for Variance
This Service provides Building & Planning services.
A £240k favourable variance in employee costs is due to delays and difficulties
filling vacancies. This is partly offset by a £103k adverse variance in projected
income driven by reduced building warrant submissions.
Regulatory and Regeneration
This service deals with the administration functions and Democratic Services
within the Authority.
The favourable variance is due to a number of vacancies that are yet to be filled
(£46k) and the remaining balance being driven by an increase in income from
fees and charges.
The 3 Groups within this service (Food and Business Group, Environmental
Pollution Group and Community Health Protection Group) are responsible for all
aspects of Environmental Health work.
The reason for the favourable variance is the number of ongoing vacancies.
This services provides legal advice to the Council.
The reason for the favourable variance is the number of ongoing vacancies.
Page 241

Page 130

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Catering 4,732 5,102 370 8% 
Service Description
Main Issues / Reason for Variance
Facilities Assistants 2,410 2,278 (131) -5% 
Service Description
Main Issues / Reason for Variance
Facilities Management 504 558 54 11% 
Service Description
Main Issues / Reason for Variance
Arts & Heritage 296 175 (121) -41% 
Service Description
Main Issues / Reason for Variance
This service provides the provision & protection of Arts & Heritage
There is two years income (£120k) from Clydebank Property Co. for the
management fee of the Titan crane as the 2023/24 fee wasn't accrued
This service provides Facility Assistants throughout WDC buildings.
There is a favourable variance against employee costs due to a number of
vacancies througout the year
Management and Team Leaders for Facilities Services such as Cleaning,
Catering and Facilities Assistants.
There is an adverse variance against employee costs principally because
turnover is not being achieved.
£0.350m of RSG that was previously allocated to the service has been
reallocated to the RSG line within the budget.  However the budget for FSM was
not adjusted to reflect this and therefore it is shown as an overspend in 2024-25. 
This has been added as a budget pressure per the June Finance update.
Citizens, Culture and Facilities
Catering Services across WDC
Page 242

Page 131

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Primary Schools 34,331 33,973 (358) -1% 
Service Description
Main Issues / Reason for Variance
Secondary Schools 35,524 35,165 (359) -1% 
Service Description
Main Issues / Reason for Variance
Specialist Educational Provision 21,562 21,997 435 2% 
Service Description
Main Issues / Reason for Variance
Leisure Management 3,364 3,498 134 4% 
Service Description
Main Issues / Reason for Variance 
Psychological Services 725 663 (62) -9% 
Service Description
Main Issues / Reason for Variance
Payment to West Dunbartonshire Leisure Trust for leisure services
Most of additional payments to WDLT (£100k) will be covered by an earmarked
balance with the balance being primarily unachieved income.
This service provides Psychological Support to pupils within West
Dunbartonshire.
Vacancies during year and a higher year end recharge to Early Years
This service area includes all Secondary Schools.
The favourable variance is attributable to the average unpromoted teacher salary
being slightly less than forecast when the budget was set and the number of
probationers being less than budgeted. This has offset the adverse variance
which has arisen due to a number of items  being higher than anticipated when
the budget was set : school transport (£284k), accidental/malicious damage
(£32k), upkeep of grounds (£26k) and non-domestic rates (£149k).
This service area covers all ASN Services.
The largest budget pressure is an increased cost for taxis (£450k). Following a
review of internal transport recharges transport costs are £169k higher than
budget.
Education , Learning and Attainment
This service area includes all Primary Schools.
The favourable variance is attributable to the average unpromoted teacher salary
being slightly less than forecast when the budget was set and the number of
probationers being less than budgeted. In addition, property cost recharges to
Early Years for those centres located within primaries was greater than
budgeted.This offsets the adverse variance against non-domestic rates (£219k)
and higher transport costs (£225k) .Shortfalls from the early start clubs will be
covered from the smoothing fund (£107k).
Page 243

Page 132

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Early Education 18,913 18,442 (472) -2% 
Service Description
Main Issues / Reason for Variance
Central Admin 868 1,017 149 17% 
Service Description
Main Issues / Reason for Variance
This service area covers Education Directorate
There is an adverse variance against Summer Programme activities (£103k)
which will be covered by an earmaked balance. The remaining adverse variance
is attributable to school meal holiday payments (£82k) being in excess of the
sum allocated by the Scottish Government - our eligible caseload is about 15%
higher than the caseload implicit in our actual allocation.In addition, FSM
payments were made for the day the schools closed because of Storm Eowyn in
late January.These adverse variances were partly offset by lower payments to
other bodies.
This services area includes all Early Years establishments within West
Dunbartonshire.
Adverse variances against net cross-boundary transactions (£152k),
commissioned places payments (£113k) and property costs (£47k) have been
offset by favourable variance on employee costs. The CFCR for Dalreoch ELC of
£150k is not reflected in this service variance.
Page 244

Page 133

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Transport, Fleet & Maintenance
Services (779) (613) 166 -21% 
Service Description
Main Issues / Reason for Variance
Roads Services 2,583 3,284 701 27% 
Service Description
Main Issues / Reason for Variance
Outdoor Services 206 347 140 68% 
Service Description
Main Issues / Reason for Variance
Employee costs have underspent by £178k due to current levels of vacancies
and planned roads programme. Transport and plant costs have  overspent by
£269k, mainly due to plant hire costs of £252k. This is due to plant required to
carry out planned programme. Supplies and Services have overspent by £461k
due to Salt for gritting overspent by £58k to undertake requirements for winter
gritting programme and Street lighting overspent by £33k due to increased utility
costs. The remainder being for the materials required to udnertake roads
projects.Income under recovered by £75K. £325K is due to parking enforcement
income saving which was not achieved and will be met by the smoothing fund
however this is offset by increased projection of recharges to capital projects for
works undertaken (£250K). The remaining variance is due to small variances
across the service.
Transport services across WDC
Employee Costs overspent by £199k due to staffing levels required to meet user
needs some of which is undertaken through overtime. Transport and Plant costs
have underspent by £192k due to a reduction in the number of vehicles being
hired. Supplies and Services overspent by £179k mainly due to level of 
equipment required to undertake the current service. The under recovery in
income is due to WDC MOT station (£60k) with the remaining £261k due to
costs not being fully recharged out. The remaining £23k is due to small variances
thourghout the service.
This service covers the outdoor sporting facilities provided by WDC and public
conveniences
There is an underspend of £61k on employee costs due to current level of
vacancies. Property costs have overspent by £71k mainly due to utility costs
which relate to previous years. Income under recovered by £120k mainly due to
the golf club as income assumed when setting the budget is higher than has
been realised. This is an uncontrollable cost. The remaining £25k variance is due
to small variances throughout the service.
Roads and Neighbourhood
This service relates to Roads operations, design, structures, street lighting, road
safety and school crossing patrols
Page 245

Page 134

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Burial Grounds (296) (185) 111 -38% 
Service Description
Main Issues / Reason for Variance
Crematorium (1,229) (983) 246 -20% 
Service Description
Main Issues / Reason for Variance
Waste Services 9,004 9,636 632 7% 
Service Description
Main Issues / Reason for Variance
Consultancy Services 816 735 (81) -10% 
Service Description
Main Issues / Reason for Variance
Waste Collection and Refuse disposal services
Employee costs overspent by £188k mainly due to overtime costs to cover public
holidays and periods of annual leave/sickness.  Transport costs overspent by
£432k principally due to internal recharges of £316k and vehicle hire costs of
£113k. Supplies and Service underspent by £32k mainly due to an underspend
of £160k which is partially offset by an overpsend on bin replacement of £109k.
Various other areas are overspending by £18k which is due to current service
requirements. Income is anticipated to under recover by £23k mainly due to
sales being lower than anticipated.
This service provides the architectural support to WDC
Favourable variance due to disbanding of team and staff moving to HRA and
HMTO for last two months of the year.
This service provides burial services within the Council area
Income from burials is less than budgeted (108k) which is uncontrollable. The
remaining £3k is due to small variances in proprety and transport costs.
This service provides crematorium services within the Council area
Income from cremations is less than budgeted (£272k) which is uncontrollable.
The remaining variance is due to small variances throughout the service.
Page 246

Page 135

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Ground Maintenance & Street Cleaning
Trading A/c (2,399) (2,158) 241 -10% 
Service Description
Main Issues / Reason for Variance
Grounds Maintenance & Street
Cleaning Client 7,414 7,324 (90) -1% 
Service Description
Main Issues / Reason for Variance
Housing Maintenance Trading A/c (589) 0 589 -100% 
Service Description
Main Issues / Reason for Variance
This service delivers maintenance and investment services to the council's
housing stock
At its meeting on 5 March 2025, Council agreed to transfer the 2024/25 HMTO
surplus from the general fund to the Housing Revenue Account.
This service provides the delivery of grounds maintenance and street cleaning
The main reason for this favourable variance relates to costs being funded by
Developer Contributions.
Housing and Employability
Trading operation providing grounds maintenance and street cleaning services
Employee costs are underspending by £149k mainly due to current levels of
vacancies and overtime anticipated. Property costs are anticipating an
overspend of £74k mainly due to recharges from Grounds of £33k, and utilities of
£30k. Transport costs are anticipating to overspend by £61k. This is due to an
anticipated overspend on insurance costs of £150k and internal fleet
maintenance charges of £43k, partially offset by a projected underspend of
£132k in vehicle hire charges. The overspend on supplies and services is
forecast to be £225k. This is mainly due to payments being made to contractors
of £108k, £45k for materials and £43k for the repair and maintenance of
vehicles. The remaining variance of £33k is due to small overspends in various
areas.
Page 247

Page 136

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Sundry Services 5,987 3,591 (2,396) -40% 
Service Description
Main Issues / Reason for Variance
Loan Charges 20,282 21,368 1,086 5% 
Service Description
Main Issues / Reason for Variance
Capital Receipts used to fund Loan
Charges (2,884) (1,862) 1,022 -35% 
Service Description
Main Issues / Reason for Variance
Requisition (HSCP) 89,342 89,830 488 1% 
Service Description
Main Issues / Reason for Variance
The Council budgets to use capital receipts to fund the repayment of the principle
on loan charges and any premiums incurred when restructuring loans.
Capital receipts were lower than anticipated as a number of land sales that were
expected to have concluded as at 31 March are still ongoing.  The budget for
capital receipts is considered to be too high and as a result a budget pressure
will be added to reduce forecast receipts in future years.
This budget covers the servicing of the Council's external borrowing
requirements
Loan charges were higher than forecast due to the impact of IFRS 16 which
moved lease expenditure from services to loan charges (£0.260m).  In addition
the unpredictability in the interest rates during 2024-25 makes the forecasting of
final loan charges difficult.
The budget represents the funding contribution towards the West Dunbartonshire
Health & Social Care Partnership.
At its meeting on 5 March 2025, Council agreed to pass through to the HSCP,
their share of the 24/25 pay award funding made available by the Scottish
Government, which reflects the adverse variance shown.
Other
Miscellaneous
This service area budgets for non departmental specific costs such as pensions
costs, external grants, external audit fees and insurance costs. The service
heading also holds a number of general savings options which have still to be
fully allocated eg procurement targets.
This favourable variance relates mainly to the transfer in of income from
suspense/earmarked reserves, namely: £0.920m ESF Income per June 2024
finance report, £0.325m Unutilised VR/VS provision and £1.058m released from
suspense.
Page 248

Page 137

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2024/25
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend RAG Status
£000 £000 £000 %
31 March 2025
Budget Details
Variance Analysis
Variance
Non GAE Allocation (9,055) (8,555) 500 -6% 
Service Description
Main Issues / Reason for Variance
Council Tax (40,920) (41,701) (781) 2% 
Service Description
Main Issues / Reason for Variance
Resources
This funding details the amount of income anticipated to be collected from
residents in the form of Council Tax.
Council Tax income was higher than budget as collection rates were higher than
forecast.  Final council tax collected is only calculated as part of the year end
clearout.
The main reason for this adverse variance is due to a reduction in employee
costs driven by the reduction in pension contributions.
This budget represents the recharge of central support services to non GAE
services ie HRA
Page 249

Page 138

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2024/25
PERIOD END DATE
Budget
2024/25
Spend to Date
2024/25
Forecast
Spend
2024/25
Annual RAG
Status
£000 £000 £000 £000 %
Employee Costs 7,661 7,521 7,521 (140) -2% 
Property Costs 2,600 2,638 2,638 38 1% 
Transport Costs 148 172 172 24 0% 
Supplies, Services And Admin 406 395 395 (11) -3% 
Support Services 2,788 2,627 2,627 (161) -6% 
Other Expenditure 330 612 612 282 85% 
Repairs & Maintenance 15,208 11,323 11,323 (3,885) -26% 
Bad Debt Provision 876 1,176 1,176 300 34% 
Void Loss (Council Tax / Lost Rents) 1,109 1,304 1,304 195 18% 
Loan Charges 22,092 25,587 25,587 3,495 16% 
Total Expenditure 53,218 53,355 53,355 137 0% 
House Rents (51,049) (51,170) (51,170) (121) 0% 
Lockup Rents (215) (222) (222) (7) 3% 
Factoring/Insurance Charges (1,555) (1,556) (1,556) (1) 0% 
Other rents (130) (126) (126) 4 -3% 
Interest on Revenue Balance (146) 260 260 406 -278% 
Miscellaneous income (123) (183) (183) (60) 49% 
Transfer from Reserves 0 0 0 0 0% 
Total Income (53,218) (52,997) (52,997) 221 0% 
Net Expenditure 0 358 358 358 
31 March 2025
Subjective Summary Forecast Variance
2024/25
Page 250

Page 139

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2025
PERIOD 12
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Employee Costs 7,661 7,521 (140) -2% 
Main Issues
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Support Services 2,788 2,627 (161) -6% 
Main Issues
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Other Expenditure 330 612 282 85% 
Main Issues
Variance Analysis
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Description
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Description
Recharge of Central Supports costs ( e.g. Finance, Legal, HR. ICT ) to the HRA
Variance Narrative
Employees charged directly to the HRA.
Variance Narrative
An employee cost underspend after management targeted staffing efficiencies, including tighter
controls on staff recruitment and overtime.
Variance Analysis
Subjective Description
Rent abatements, support for young tenants, legal and banking expenses, and other sundry costs.
Variance Narrative
A rent abatement overspend because demand exceeded the new abatement budget. It is worth
noting that the 2024/2025 rent abatement spend was £170,000 less than the 2023/2024 spend.
Payment of £84,000 to Womens Aid to support vulnerable tenants. Womens Aid payments stop
on 1st April 2025.
An underspend because the budgeted recharge of £2.788m did not  account for reduced employer
pension contributions across central services. 
Variance Analysis
Subjective Analysis Forecast Variance
2024/25 RAG Status
Page 251

Page 140

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2025
PERIOD 12
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Repairs & Maintenance 15,208 11,323 (3,885) -26% 
Main Issues
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Bad Debt Provision 876 1,176 300 34% 
Main Issues
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Void Loss (Council Tax / Lost Rents) 1,109 1,304 195 18% 
Main Issues
Responsive and planned repair and maintenance services to houses and lockups and income recovered from tenant rechargeable and owner
occupier repairs.
Variance Narrative
Officers  reviewed the repairs spend and identified savings against the 2024/2025 repair and
maintenance budget by transferring spend charged to revenue to the capital programme. A review
of specific workstreams identified revenue funded works that extend the lifespan of the assets.
Specifically work carried out in void properties to bring these back to relet standard are significant
and include component renewals.
Furthermore, the completion of an Electrical Installation Condition Report (EICR) is
complementary to the environmental sensor installation programme and the EICR spend has been
capitalised in 2024/2025.
Variance Analysis
Variance Analysis
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Description
The bad debt provision assessment was higher than budgeted because of increasing ret arrears
and challenges recovering other HRA debt ( factoring charges, rechargeable repairs, owners
contribution to HRA capital works)
Variance Analysis
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Description
Provision for uncollected rent across range of HRA debts, including rent arrears, rechargeable repairs, factoring repairs.
Variance Narrative
Subjective Description
Lost rental income for void houses and lockups and the cost of council tax on long term void properties
Variance Narrative
The number of void properties and the length of time properties were void adversely affected
performance. Council tax payments for longer term void houses also exceed budgeted.
Performance has been hampered by utility company delays resolving debt on meters and meter
reconnections.
Page 252

Page 141

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2025
PERIOD 12
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Loan Charges 22,092 25,587 3,495 16% 
Main Issues
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
House Rents (51,049) (51,170) (121) 0% 
Main Issues
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Interest on Revenue Balance (146) 260 406 -278% 
Main Issues
Variance Analysis
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Description
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Description
Rental income from the letting of housing stock to tenants, homeless units and other parties.
Variance Narrative
Loans Fund repayments and the  payment of interest and expenses on outstanding HRA debt.
Variance Narrative
Local authority borrowing costs for medium / long term Public Works Loan Board (PWLB) debt
and for short term debt have remained  high. The higher interest rates are driving up HRA debt
financing costs. The HRA budget assumed that borrowing rates would reduce in 2024/2025.
Whilst the Bank of England base rates have reduced during the latter part of 2024/25, the final
borrowing rates were higher than budgeted.
Variance Analysis
Subjective Description
The interest charged or interest earned on HRA cash balances.
Variance Narrative
HRA reserves have reduced and HRA cash outflows have exceeded HRA cash inflows. The HRA
has operated with negative cash balances during 2024/25 leading to an interest charge being
payable as opposed to the HRA receiving an interest credit.
A slight over-recovery reflecting some new build properties being available for let earlier than
budgeted.
Variance Analysis
Subjective Analysis Forecast Variance
2024/25 RAG Status
Page 253

Page 142

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
HRA REVENUE BUDGETARY CONTROL 2023/24
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2025
PERIOD 12
Budget
2024/25
Forecast
Spend
2024/25
£000 £000 £000 %
Miscellaneous income (123) (183) (60) 49% 
Main Issues
Miscellaneous HRA income including grants, owners electricity recharges and income from recharging some overhead cost to the HMTO
service.
Variance Narrative
The over-recovery reflects a Scottish Enterprise grant receipt to support property investment
works
Variance Analysis
Subjective Analysis Forecast Variance
2024/25 RAG Status
Subjective Description
Page 254

Page 143

Summary at Period 12
Project
Life
Budget
Project Life
Forecast
Spend
Project
Life
Variance
On
Track/Complete Off Track
£'000 £'000 £'000
Resources 52,610    52,610            0 13 0
Citizen, Cultural and Facilities 2,912      2,912              -          2                          0
Regulatory and Regeneration 57,440    57,440            -          14                        0
Roads and Neighbourhoods 130,634  130,772          138         35                        0
Education 60,825    60,825            -          5                          0
HSCP 9,330      9,330              -          3                          0
People and Transformation 10,141    10,141            -          4                          0
Total 323,893  324,031          138 76 0
APPENDIX 4
Page 255

Page 144

All Approved Projects at Period 12
Service Project
Recurring/Non
Recurring Budget Committee
Completion
Date
Revised
End Date
Project Life
Budget
Spend to
31/3/24 Spend to
Date
Projected
Future
Spend
Total
Projected
Spend
Project
Variance Approved
Budget 2024/25
Actual to date
2024/25
In Year
Variance Overspend Underspend
Re-
profiling
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
1 RES 1 Valuation Joint Board - Requisition of ICT Equipment NR CSC 31/03/2025 31/03/2025 24 6 17 7 24 0 11 11 0 0 0 0
2 RES 2 Cash Receipting system enhancements NR CSC 30/09/2023 31/03/2025 5 5 5 0 5 0 0 0 0 0 0 0
3 RES 3 Agresso Development NR CSC 30/04/2024 30/09/2024 92 62 86 6 92 0 30 24 -6 0 0 -6
4 RES 4 Cost of Living NR CSC 30/04/2024 31/03/2026 1,002 502 502 500 1,002 0 250 0 -250 0 -250 0
5 RES 5 IFRS 16 Database NR CSC 31/03/2026 31/03/2025 5 0 0 5 5 0 5 0 -5 0 -5 0
6 RES 6 Community Success Capital Fund NR CSC 31/03/2023 31/03/2023 150 0 0 150 150 0 150 0 -150 0 0 -150
7 RES 7 Community Sports Success NR CSC 31/03/2025 31/03/2025 250 0 10 240 250 0 250 10 -240 0 0 -240
8 RES 8 Strathleven Place (formerly part of Glencairn House project) NR IRED 31/03/2025 31/03/2025 1,590 0 0 1,590 1,590 0 90 0 -90 0 0 -90
9 RES 9 New Sports Changing Facility Glen Lusset NR IRED 31/03/2025 31/03/2025 0 0 0 0 0 0 0 32 32 32 0 0
10 RES 10 New Sports Changing Facility Dumbarton West (Old OLSP site)  NR IRED 31/03/2024 31/03/2025 349 9 9 340 349 0 0 0 0 0 0 0
11 RES 11 Building Upgrades and H&S - lifecycle & reactive building upgrades R IRED 31/03/2024 31/03/1933 25,370 0 3,384 21,986 25,370 0 3,202 3,384 182 182 0 0
12 RES 12 Direct Project Support R CSC 31/03/2025 31/03/2025 14,274 0 3,527 10,747 14,274 0 1,586 3,527 1,941 1,941 0 0
13 RES 13 Depot Rationalisation NR IRED 31/03/2025 31/03/2025 8,500 649 2,335 6,165 8,500 0 1,500 1,686 186 186 0 0
14 RES 14 Finance Ledger System NR CSC 01/01/2025 31/03/2027 1,000 0 34 966 1,000 0 20 34 14 14 0 0
Total Resources 52,610 1,232 9,909 42,702 52,610 0 7,094 8,709 1,615 2,355 -255 -486
1 CCF 1 Heritage Capital Fund NR CSC 30/03/2024 31/03/2026 2,491 2,234 2,798 -306 2,491 0 257 564 306 306 0 0
2 CCF 2 Transformation of Infrastructure Libraries and Museums NR CSC 31/03/2024 31/03/2025 421 326 375 46 421 0 95 49 -46 0 0 -46
Total CCCF 2,912 2,560 3,173 -260 2,912 0 353 613 260 306 0 -46
1 RR 1 Legal Case Management System NR CSC 31/03/2024 31/03/2026 33 0 0 33 33 0 0 0 0 0 0 0
2 RR 2 Re -imagine Antonine Wall   NR CSC 31/03/2024 31/03/2025 30 15 23 7 30 0 15 8 -7 0 -7 0
3 RR 3 Installation of Solar PV at Clydebank Leisure Centre NR IRED 31/03/2023 31/03/2025 61 4 4 57 61 0 0 0 0 0 0 0
4 RR 4 Replace failed heating controls/valves & recommission NR IRED 31/03/2023 31/03/2025 20 0 6 14 20 0 6 6 0 0 0 0
5 RR 5 Lighting upgrades to LED in schools and Corporate buildings NR IRED 31/03/2025 31/03/2025 0 0 0 0 0 0 0 0 0 0 0 0
6 RR 6
Leisure Energy projects - air handling units, upgrade lighting, circulating pumps,
and draught proofing NR IRED 31/03/2023 31/03/2025 290 64 64 226 290 0 0 0 0 0 0 0
7 RR 7 Regeneration/Local Economic Development R IRED 31/03/2025 31/03/2025 7,922 0 194 7,728 7,922 0 210 194 -16 0 0 -16
8 RR 8 Regeneration Fund NR IRED 31/03/2024 31/03/2028 10,931 7,107 7,107 3,824 10,931 0 0 0 0 0 0 0
9 RR 9 Place Based Investment NR IRED 31/03/2023 31/03/2027 1,806 1,398 1,401 406 1,806 0 3 3 0 0 0 0
10 RR 10 Clydebank Can on the Canal NR IRED 31/12/2022 31/12/2025 757 40 40 717 757 0 0 0 0 0 0 0
11 RR 11 Level Up Funding NR IRED 31/03/2025 31/03/2026 22,100 6,770 11,851 10,249 22,100 0 5,325 5,081 -244 0 0 -244
12 RR 12 Level Up Capacity Funding NR IRED 31/03/2023 31/03/2026 320 160 160 160 320 0 0 0 0 0 0 0
13 RR 13 District Heating Network Expansion NR IRED 31/03/2024 31/03/2028 11,104 -40 259 10,845 11,104 0 250 299 49 49 0 0
14 RR14 Clyde Mission Catalyst Fund NR IRED 31/03/2024 31/03/2026 2,000 415 673 1,327 2,000 0 170 258 88 88 0 0
15 RR15 Securing sites NR IRED 31/03/2025 31/03/2025 66 0 35 30 66 0 66 35 -30 0 0 -30
Total Regulatory and Regeneration 57,440 15,931 21,816 35,624 57,440 0 6,044 5,885 -160 137 -7 -290
1 RN 1 Infrastructure - Roads R IRED 31/03/2025 31/03/2033 22,808 0 2,340 20,467 22,808 0 2,454 2,340 -114 0 0 -114
2 RN 2 Flood Risk Management R IRED 31/03/2025 31/03/2033 2,215 0 215 2,000 2,215 0 400 215 -185 0 0 -185
3 RN 3 Street lighting and associated electrical infrastructure R IRED 31/03/2025 31/03/2033 914 0 115 798 914 0 114 115 2 2 0 0
4 RN 4 Flood Prevention R IRED 31/03/2025 31/03/2025 450 161 257 193 450 0 289 96 -193 0 0 -193
5 RN 5 Vehicle Replacement R IRED 31/03/2024 31/03/2033 12,219 0 2,575 9,644 12,219 0 3,065 2,575 -490 0 0 -490
6 RN 6 Auld Street Clydebank - Bond NR IRED 31/03/2024 31/03/2025 256 214 214 42 256 0 42 0 -42 0 0 -42
7 RN 7 River bank erosion repair - Levenhowe NR IRED 31/03/2024 31/03/2025 20 0 0 20 20 0 20 0 -20 0 0 -20
8 RN 8 Clydebank Charrette, A814 NR IRED 31/03/2022 31/03/2025 4,303 4,215 4,251 52 4,303 0 88 36 -52 0 0 -52
9 RN 9 Roads Plant NR IRED 31/03/2025 31/03/2025 80 14 79 1 80 0 66 65 -1 0 0 -1
10 RN 10 A813 Road Improvement Phase 1 NR IRED 31/03/2026 31/03/2027 1,700 1,057 1,379 322 1,700 0 643 321 -322 0 0 -322
11 RN 11 Pavement Improvements NR IRED 31/03/2025 31/03/2025 1,000 958 1,002 -2 1,000 0 42 43 2 2 0 0
12 RN 12 Traffic Signal Updates NR IRED 31/03/2025 31/03/2025 300 274 286 14 300 0 26 12 -14 0 0 -14
13 RN 13 Gruggies Burn Flood Prevention NR IRED 31/03/2024 31/03/2028 15,028 576 987 14,042 15,028 0 550 410 -140 0 0 -140
14 RN 14 Electrical Charging Points - Rapid Charge NR IRED 31/03/2023 31/03/2025 314 299 315 0 315 0 15 15 0 0 0 0
15 RN 15 River Leven Flood Prevention Scheme NR IRED 31/03/2024 31/03/2026 801 181 181 620 801 0 0 0 0 0 0 0
16 RN 16 Vehicle Replacement Strategy R IRED 31/03/2025 31/03/2033 1,400 0 6 1,394 1,400 0 1,400 6 -1,394 0 0 -1,394
17 RN 17 Posties Park Sports Hub - New sports hub to include Gym & running track NR IRED 31/03/2022 29/11/2025 6,718 5,878 6,818 38 6,856 138 840 940 100 100 0 0
18 RN 18 Public non-adopted paths and roads R IRED 31/03/2024 31/03/2033 2,419 0 303 2,116 2,419 0 619 303 -316 0 0 -316
19 RN 19 Cemetery Extension, North Dalnotter NR IRED 31/03/2024 31/03/2025 264 14 14 250 264 0 0 0 0 0 0 0
20 RN 20 Vale of Leven Cemetery NR IRED 31/03/2025 31/03/2025 828 741 912 -84 828 0 87 171 84 84 0 0
21 RN 21 Allotment Development NR IRED 31/03/2024 30/09/2024 492 215 312 180 492 0 154 97 -57 0 0 -57
22 RN 22 Waste Transfer Station NR IRED 31/03/2024 31/03/2026 1,980 0 159 1,821 1,980 0 200 159 -41 0 0 -41
23 RN 23 Play Area Upgrade Programme NR IRED 31/03/2028 31/03/2033 1,907 149 594 1,313 1,907 0 417 445 29 29 0 0
24 RN 25 Whitecrook Tennis Court NR IRED 31/03/2024 31/03/2024 45 44 45 0 45 0 1 1 0 0 0 0
25 RN 26 East End Park Resurfacing NR IRED 31/03/2024 31/03/2025 385 6 183 202 385 0 379 177 -202 0 0 -202
26 RN 27 Park Improvements and Multi Games Area - Goldenhill Park NR IRED 31/03/2024 31/03/2025 150 0 164 -14 150 0 150 164 14 14 0 0
27 RN 28 Balloch Mountain Bike Track NR IRED 30/11/2023 30/09/2025 450 0 7 443 450 0 20 7 -13 0 0 -13
28 RN 29 Pappert 2G Pitch NR IRED 31/03/2024 31/03/2025 250 8 8 242 250 0 242 1 -242 0 0 -242
29 RN 30 Kilmaronock Cemetery Extension NR IRED 31/03/2023 31/03/2025 50 45 45 5 50 0 5 0 -5 0 0 -5
30 RN 31 Exxon City Deal NR IRED 31/03/2027 31/03/2028 46,942 6,780 11,370 35,572 46,942 0 4,500 4,590 90 90 0 0
31 RN 32 Cycling, Walking, Safer Routes Tier 1 (Active Travel) R IRED 31/03/2025 31/03/2025 1,033 0 397 636 1,033 0 646 397 -249 0 0 -249
Full Project Life In Year
Page 256

Page 145

All Approved Projects at Period 12
Service Project
Recurring/Non
Recurring Budget Committee
Completion
Date
Revised
End Date
Project Life
Budget
Spend to
31/3/24 Spend to
Date
Projected
Future
Spend
Total
Projected
Spend
Project
Variance Approved
Budget 2024/25
Actual to date
2024/25
In Year
Variance Overspend Underspend
Re-
profiling
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Full Project Life In Year
32 RN 33
Creation of 3 new all weather pitches at Argyll Park, Posties Park and Mountblow
playing fields. NR IRED 31/03/2026 31/03/2026 2,250 0 47 2,203 2,250 0 50 47 -3 0 0 -3
33 RN 34
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure
improvements & Park and Rides NR IRED 31/03/2025 31/03/2025 333 0 55 278 333 0 333 55 -278 0 0 -278
34 RN 35 Transport Scotland 24-25 Implementation 20MPH Speed Limits NR IRED 31/03/2025 31/03/2025 254 0 221 33 254 0 254 221 -33 0 0 -33
35 RN 36 Review of Schools speed limits NR IRED 31/03/2026 31/03/2026 75 0 0 75 75 0 0 0 0 0 0 0
Total Roads and Neighbourhood 130,634 21,831 35,858 94,914 130,772 138 18,109 14,027 -4,082 321 0 -4,403
1 EDUC 1 AV Equipment - Education NR EDUC 31/03/2030 31/03/2030 859 292 356 503 859 0 60 64 4 4 0 0
2 EDUC 2 Digital Inclusion NR EDUC 31/03/2023 31/03/2025 356 324 328 28 356 0 32 5 -28 0 0 -28
3 EDUC 3 Schools Estate Improvement Plan - next Phase - Faifley Campus NR EDUC 31/03/2027 31/03/2027 36,515 2,491 24,767 11,748 36,515 0 20,896 22,276 1,380 1,380 0 0
4 EDUC 4 Early Years Early Learning and Childcare Funding NR EDUC 0 0 0 0 0 0 0 1 1 1 0 0
5 EDUC 5 Schools Estate Improvement Plan NR EDUC 31/03/2025 31/03/2025 21,904 18,734 19,921 1,983 21,904 0 3,170 1,186 -1,983 0 0 -1,983
6 EDUC 6 Free School Meals Expansion NR EDUC 31/03/2025 31/03/2025 1,191 0 23 1,168 1,191 0 75 23 -52 0 0 -52
Total Education 60,825 21,841 45,395 15,430 60,825 0 24,233 23,555 -678 1,385 0 -2,063
1 HSCP 1 Special Needs - Aids & Adaptations for HSCP clients R HSCP 31/03/2025 31/03/2025 6,765 0 886 5,879 6,765 0 867 886 19 19 0 0
2 HSCP 2 ICT Modernisation HSCP R HSCP 31/03/2025 31/03/2025 1,668 0 27 1,641 1,668 0 50 27 -23 0 0 -23
3 HSCP 3 Community Alarm upgrade R HSCP 31/03/2025 31/03/2025 897 0 305 592 897 0 273 305 32 32 0 0
Total HSCP 9,330 0 1,218 8,112 9,330 0 1,190 1,218 28 51 0 -23
1 P&T 1 ICT Modernisation R CSC 31/03/2025 31/03/2025 4,718 0 695 4,023 4,718 0 482 695 213 213 0 0
2 P&T 2 ICT Security & DR R CSC 31/03/2025 31/03/2025 4,143 0 697 3,446 4,143 0 642 697 55 55 0 0
3 P&T 3 365 Implementation NR CSC 30/09/2023 31/03/2026 983 418 757 226 983 0 325 339 14 14 0 0
4 P&T 4 Development of Workforce Management System NR CSC 31/03/2030 31/03/2030 298 0 0 298 298 0 46 0 -46 0 0 -46
Total P&T 10,141 418 2,149 7,993 10,141 0 1,494 1,730 236 282 0 -46
78 Overall Total 323,893 63,813 119,517 204,514 324,031 138 58,518 55,737 -2,781 4,838 -262 -7,357
Page 257

Page 146

All Approved HRA Capital Projects at Period 12  _  31 March 2025 Appendix 5
Project Category Project Life
Budget
Expenditure
to 31 /3/24
Expenditure
to Date
Projected
Future Spend
Project Life
Forecast Spend
Project
Variance
Approved
Budget
2024/25
Expenditure
to Date
2024/25
Projected
Spend
2024/25
In Year
Variance
2024/25
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
OCE1 Special Needs Adaptations Rolling 3,408                     -                              506                        2,902                     3,408                     -                              655                        506                        500                        (149)
OCE2 Capitalised Minor Works Rolling 10,945                   -                              3,904                     7,041                     10,945                   -                              3,000                     3,904                     4,100                     904
OCE3 Better Homes Priority Budget Rolling 1,680                     -                              966                        714                        1,680                     -                              705                        966                        975                        261
OCE4 Environmental Sensors Programme Project 10,000                   103                        1,525                     8,475                     10,000                   -                              2,000                     1,422                     2,000                     (578)
OCE5 Housing CCTV Installation Programme Project 750                        -                              -                              750                        750                        -                              750                        -                              -                              (750)
OCE6 QL Development Rolling 109                        -                              16                          93                          109                        -                              21                          16                          21                          (5)
OCE7 Gypsy Travellers Site Rolling 141                        -                              46                          95                          141                        -                              34                          46                          46                          12
OCE8 Airport Noise Project 96                          -                              -                              96                          96                          -                              -                              -                              -                              -                        
Other Capital Expenditure 27,129                   103                        6,963                     20,166                   27,129                   -                         7,165                     6,860                     7,642                     305-                       
MCR1 Targeted SHQS /EESSH compliance works Rolling 32,632                   -                              5,233                     27,399                   32,632                                               -   6,537                     5,233                     6,500                     (1,304)
MCR2 External Component Renewal - Roofs Rolling 13,010                   -                              1,741                     11,269                   13,010                                               -   2,500                     1,741                     1,700                     (759)
MCR3 Doors/Windows Component Renewals Rolling 14,599                   -                              4,483                     10,116                   14,599                                               -   5,011                     4,483                     5,000                     (528)
MCR4 District Heating Project 6,400                     -                              -                              6,400                     6,400                                                 -   -                              -                              -                              -                        
MCR5 External Stores / Garages / Bin Stores Rolling 245                        -                              11                          234                        245                                                    -   47                          11                          20                          (36)
MCR6 Secure entry component renewals Rolling 245                        -                              13                          232                        245                                                    -   47                          13                          20                          (34)
MCR7 Statutory / Regulatory Compliance Works Rolling 976                        -                              23                          953                        976                                                    -   294                        23                          22                          (271)
MCR8 Heating Improvement Works Rolling 8,800                     -                              2,100                     6,700                     8,800                                                 -   1,900                     2,100                     2,200                     200                       
MCR9 Energy Improvements / Energy Efficiency Works Rolling 295                        -                              -                              295                        295                                                    -   57                          -                              -                              (57)
MCR10 Kitchen Upgrade Rolling 12,102                   -                              3,556                     8,546                     12,102                                               -   2,652                     3,556                     3,500                     904                       
MCR11 Bathroom & Shower Replacement Rolling 3,300                     -                              557                        2,743                     3,300                                                 -   750                        557                        600                        (193)
Major Component Replacement 92,604                   -                         17,717                   74,887                   92,604                   -                         19,795                   17,717                   19,562                   (2,078)
VOC1 Void House Strategy Programme Rolling 19,212                   -                              5,414                     13,798                   19,212                                               -   4,902                     5,414                     5,300                     512                       
Void Capital 19,212                   -                         5,414                     13,798                   19,212                   -                         4,902                     5,414                     5,300                     512                       
STE1 Defective structures/component renewals Rolling 2,210                                                   - 958                        1,252                     2,210                                                   - 712                        958                        919                        246                       
STE2 Environmental Renewal - Paths & Environment Rolling 5,559                                                   - 904                        4,655                     5,559                                                   - 1,068                     904                        936                        (164)
STE3 Asbestos Management Works Rolling 1,235                                                   - 170                        1,065                     1,235                                                   - 237                        170                        150                        (67)
STE4 Multi Storey Flat Strategy Project 5,171                     65                          83                          5,088                     5,171                                                   - 750                        18                          100                        (732)
Structural & Environmental 14,175                   65                          2,115                     12,060                   14,175                   -                         2,767                     2,050                     2,105                     (717)
SUP1 Salaries / Central Support / Overhead Rolling 14,367                   -                              3,135                     11,232                                      14,367                             -   2,761                     3,135                     2,761                     374                       
Support Costs 14,367                   -                         3,135                     11,232                   14,367                   -                         2,761                     3,135                     2,761                     374                       
Full Project Life In Year
Page 258

Page 147

All Approved HRA Capital Projects at Period 12  _  31 March 2025 Appendix 5
Project Category Project Life
Budget
Expenditure
to 31 /3/24
Expenditure
to Date
Projected
Future Spend
Project Life
Forecast Spend
Project
Variance
Approved
Budget
2024/25
Expenditure
to Date
2024/25
Projected
Spend
2024/25
In Year
Variance
2024/25
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Full Project Life In Year
AHP1 Buy Backs Rolling 20,522                   -                              3,401                     17,121                                      20,522                             -   4,670                     3,401                     4,670                     (1,269)
AHP2 Demolition Programme Rolling 485                        -                              575                        90-                                                   485                             -   485                        575                        485                        90                         
AHP3 Contingency Rolling 520                        -                              -                              520                                                 520                             -   100                        -                              -                              (100)
AHP4 Clydebank East Project 32,894                   22,334                   32,952                   58-                                             32,894                             -   9,700                     10,618                   11,235                   918                       
AHP5 Pappert Project 10,517                   601                        8,169                     2,348                                        10,517                             -   9,653                     7,568                     7,566                     (2,085)
AHP6 Mount Pleasant Project 6,005                     555                        4,900                     1,105                                           6,005                             -   4,396                     4,345                     4,311                     (51)
AHP7 7-9 Gilmour Avenue Project 574                        40                          459                        115                                                 574                             -   534                        419                        497                        (115)
AHP8 Willox Park Phase1 Project 5,143                     401                        1,951                     3,192                                           5,143                             -   2,500                     1,550                     1,463                     (950)
AHP9 Bank Street Project 7,549                     231                        297                        7,252                                           7,549                             -   518                        66                          106                        (452)
AHP10 Bonhill Gap Sites Project 11,537                   99                          242                        11,295                                      11,537                             -   514                        143                        190                        (371)
AHP11 Clydebank Health Centre Project 10,595                   705                        1,017                     9,578                                        10,595                             -   390                        312                        390                        (78)
AHP12 Silverton Project 2,537                     33                          29                          2,508                                           2,537                             -   429                        (4) 24                          (433)
AHP13 Queen Mary Avenue Project 4,556                     32                          40                          4,516                                           4,556                             -   120                        8                             10                          (112)
AHP14 Queens Quay Site C Project 8,231                     31                          31                          8,200                                           8,231                             -   1,000                     -                              -                              (1,000)
AHP15 Dennystoun Forge – New Build Project 4,000                     -                              59                          3,941                                           4,000                             -   250                        59                          50                          (191)
AHP16 Future New Build & Related Regeneration Projects Rolling 24,515                   -                              -                              24,515                                      24,515                             -   515                        -                              -                              (515)
AHP17 Fees, Staffing Costs, contingency Rolling 2,073                     -                              169                        1,904                                           2,073                             -   500                        169                        400                        (331)
Affordable Housing Supply Programme 152,253                25,062                   54,291                   97,962                   152,253                -                         36,274                   29,229                   31,397                   (7,045)
Total Expenditure 319,740                25,230                   89,635                   230,105                319,740                -                         73,664                   64,405                   68,767                   (9,259)
Project Category Project Life
Budget
Income
to 31 /3/24
Income
to Date
Projected
Future Income
Project Life
Forecast Income
Project
Variance
Approved
Budget
2024/25
Income
to Date
2024/25
Projected
Income
2024/25
In Year
Variance
2024/25
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
CAPI1 Scottish Govt Buyback Grant Rolling (9,451) -                              (1,136) (8,315) (9,451) -                              (2,858) (1,136) (2,417) 1,722                    
CAPI2 Clydebank East Project (12,605) (12,605) (12,605) -                              (12,605) -                              -                              -                              -                              -                             
CAPi3 Pappert Site Project (3,725) (172) (3,475) (250) (3,725) -                              (3,303) (3,303) (3,303) -                             
CAPI4 Mount Pleasant Project (1,838) (467) (1,837) (1) (1,838) -                              (1,371) (1,370) (1,371) 1                            
CAPI5 7-9 Gilmour Avenue Project (195) -                              191-                        (4) (195) -                              (195) 191-                        (192) 4                            
CAPI6 Willox Park Phase1 Project (1,489) (414) (1,644) 155 (1,489) -                              (1,075) (1,230) (1,116) (155)
CAPI7 Bank Street Project (2,108) (258) (258) (1,850) (2,108) -                              -                              -                              -                              -                             
CAPI8 Bonhill Gap Sites Project (4,789) (188) (377) (4,412) (4,789) -                              -                              (189) (189) (189)
CAPI9 Clydebank Health Centre Project (3,785) (585) (967) (2,818) (3,785) -                              (200) 382-                        (200) 182-                       
CAPI10 Silverton Project (1,000) -                              -                              (1,000) (1,000) -                              -                              -                              (429) 0
CAPI11 Queen Mary Avenue Project (1,600) (140) (140) (1,460) (1,600) -                              -                              -                              -                              -                             
CAPI12 Queens Quay Site C Project (3,086) (2,086) (2,086) (1,000) (3,086) -                              (1,000) -                              -                              1,000                    
CAPI13 Dennystoun Forge – New Build Project (2,000) -                              -                              (2,000) (2,000) -                              -                              -                              -                              -                             
CAPI14 Future new build sites & related regeneration projects Rolling (6,900) -                              -                              (6,900) (6,900) -                              -                              -                              -                              -                             
CAPI15 HRA Loan Repayments Rolling (5) -                              (1) (4) (5) -                              (1) (1) (1) -                             
Total Income (54,576) (16,915) (24,717) (29,859) (54,576) -                              (10,003) (7,802) (9,218) 2,201                    
Prudential Borrowing Requirement 265,164                8,315                     64,918                   200,246                265,164                -                              63,661                   56,603                   59,549                   7,058-                    
Full Project Life In Year
Page 259

Page 148

APPENDIX 6 
WEST DUNBARTONSHIRE TRUST FUNDS
DRAFT ANNUAL REPORT AND FINANCIAL
STATEMENTS FOR THE YEAR ENDED
31 MARCH 2025
Page 260

Page 149

West Dunbartonshire Trust funds
Draft Financial Statements for the year ended 31 March 2025                                                               
Contents 
Page  
Trustees’ Annual Report 3 - 6  
Statement of Receipts and Payments 7  
Statement of Balances 8   
Page 261

Page 150

West Dunbartonshire Trust funds
Draft Financial Statements for the year ended 31 March 2025 
3 | P a g e
Trustees’ Annual Report
Introduction
The Trustees present the annual report together with the Financial Statements for the year ended 31 March 2025.
Administration Information
West Dunbartonshire Council (the Council) is sole Trustee for all Trust Funds with the exception of Dunbartonshire
Educational Trust Scheme 1962 and McAuley Prize for Mathematics.  The table below identifies the Trustees for
2024/25. 
Charity Contact
Trust Fund Number Trustees Local Authority Address
Provost Karen Murray Conaghan West Dunbartonshire West Dunbartonshire Council
Councillor Daniel Lennie Church Street
Councillor June McKay Dumbarton
Councillor Lawrence O'Neill G82 1QL
Councillor Clare Steel
Councillor Diane Docherty
Councillor Jim McElhill
Councillor Lauren Oxley
Councillor Gordon Scanlan
Councillor Sophie Traynor
Provost Karen Murray Conaghan West Dunbartonshire West Dunbartonshire Council
Laura Mason (Chief Officer –
Education) West Dunbartonshire
Church Street
Laurence Slavin (Chief Officer –
Resources) West Dunbartonshire
Dumbarton
Liz Connolly (Principal) West College Scotland G82 1QL
Councillor Clare Steel West Dunbartonshire West Dunbartonshire Council
Councillor John Millar West Dunbartonshire Church Street
Councillor Hazel Sorrell West Dunbartonshire Dumbarton
Councillor James McPhilemy North Lanarkshire G82 1QL
Councillor Gordon Currie North Lanarkshire
Councillor Lynda Williamson East Dunbartonshire
Councillor Callum McNally East Dunbartonshire
Councillor Math Campbell-Sturgess Argyll and Bute
Alexander Cameron
Bequest SC025070
Dunbartonshire
Education Trust SC025070
SC025070McAuley Prize for
Mathematics
UIE Award SC025070
Page 262

Page 151

West Dunbartonshire Trust funds
Draft Financial Statements for the year ended 31 March 2025 
4 | P a g e
Objectives and 2024/25 Activity
All trusts are advertised on the Council’s website and details have been passed to West Dunbartonshire Community
and Volunteering Service (WDCVS) to publicise them.  
The objectives and activities of each of the Trusts are detailed below:
Charity
Trust Fund Number Objective 2024/25 Activity
SC025070 Alexander Cameron
Bequest
The benefit of the people of Clydebank to
assist those in need by reason of age, ill
health, disability, financial hardship or other
disadvantage.
Two grants were
awarded during
2024/25 as detailed
within note 3.
SC025070 UIE Award For students studying apprenticeships or
training in industry. No awards.
SC025070 McAuley Prize for
Mathematics
Provides prizes for those studying maths and
computing No awards.
SC025070
Dunbartonshire
Educational Trust
Scheme 1962
Awards educational prizes and bursaries.
Nine grants were
awarded during
2024/25 as detailed
within note 3. 
Structure and Governance
West Dunbartonshire Trust Funds are OSCR registered. The governance arrangements are under the control of the
Council which appoints trustees as required. The current list of trustees are shown within the table on page 3. 
Following a review of the governance documents, it was agreed at Council on 31 August 2016 that the Alexander
Cameron Bequest Trust Fund noted below would be delegated to the Alexander Cameron Committee. 
The trustees have overall responsibility for ensuring there are appropriate systems of control, financial and otherwise. 
They are also responsible for keeping proper accounting records which disclose, with reasonable accuracy, the
financial position of the Trusts and enable them to ensure   Financial Statements comply with Charities Accounts
(Scotland) Regulations 2006. They are also responsible for safeguarding the assets of the charity and are therefore
responsible for taking reasonable steps to prevent and detect fraud and other irregularities and also provide
reasonable assurances that:
• The trusts are operating efficiently and effectively.
• Assets are safeguarded against unauthorised use and disposition.
• Proper records are maintained and financial information used by the charities is reliable.
• The trusts comply with relevant laws and regulations. 
The systems of internal controls are designed to provide reasonable, but not absolute, assurance against material
misstatement or loss. The systems of internal control follow those of the Council  and, as such, much of this is
delegated to the Council’s Chief Officer - Resources.  The Council continually seeks to improve the effectiveness of its
systems of internal control so that any irregularities are either prevented or quickly detected. The systems of internal
control are based on a framework of regular management information, financial regulations, financial and
administrative procedures (including segregation of duties), management supervision and a system of delegation and
accountability.
The Financial Statements and Trustees Report are prepared by the Council’s Finance Service.
The appointed external auditors are Forvis Mazars. The Council has agreed to meet the cost of this audit and not pass
this on to the Trusts. This is to provide additional financial support to the Trusts, ensuring that core funds are not
eroded, and objectives can continue to be achieved.
The Trustees only meet as and when required during the year and will ensure that the required accounting
arrangements are adhered to.  
Page 263

Page 152

West Dunbartonshire Trust funds
Draft Financial Statements for the year ended 31 March 2025 
5 | P a g e
Management of Funds and Investment Policy
Decisions regarding the management of the Trusts are made by the Trustees. Trustees rely on the expertise of Council
staff to manage the investments to ensure the maximum return at the least risk to the Trusts. In this way, the income
stream for the future benefit of the Trusts is protected. 
Funds available are invested each year with interest earned. Investments are made both internally and externally, with
the majority invested in the Council’s Loans Fund and externally managed by the Council. 
Performance (Investments)
Income for West Dunbartonshire Trusts comes from investment returns. All Trusts (with the exception of those
investments noted below) received income on their reserves held based upon the average interest rate used for
internal investments within the Council’s loans fund which was 4.770%. 
Following a Trustee decision in 2019/20, Alexander Cameron had an element of their funds in a fixed interest
agreement. Trustees met and agreed in February 2022 to continue this investment for a further fixed term of 2 years
(the revised interest rate was 2.04%) and the overall impact of this was £1,987.38 of interest gained during 2024/25.
Dunbartonshire Educational Trust Scheme 1962 continues to receive income from external investments i.e. 3%
Clydeport and 4% Clydeport Consolidated Stock.  These investments are managed by the Council and achieved
investment income of £5 in 2024/25 (£5 in 2023/24).
Financial Review
The total balance of the Trusts as at 31 March 2025 (including stocks) is £266,833.  
On 8 July 2016 Clydeport Operations Ltd delisted 3% and 4% stocks from the London Stock Exchange. These are
stocks held by Dumbarton Educational Trust. Until further information is available it has been assumed that the
balance of this stock has remained the same as the previous year (£218). 
The Trusts held cash and bank balances at 31 March 2025 of £165,092. Reserves are held by the Council on behalf
of the Trusts and revenue income, generated from investment interest that has not been disbursed at 31 March every
year, is invested in line with the investment policy outlined above.
Declaration
This report was signed on behalf of the Trustees on 30 June 2025 by: 
Councillor Martin Rooney
West Dunbartonshire Council
30 June 2025 
Page 264

Page 153

West Dunbartonshire Trust funds
Draft Financial Statements for the year ended 31 March 2025 
6 | P a g e
Statement of Receipts and Payments Account
Receipts Payments
(Surplus)/
Deficit Receipts Payments
(Surplus)/
Deficit
2023/24 2023/24 2023/24 2024/25 2024/25 2024/25
£ £ £ £ £ £
(4,216) 0 (4,216)
Dunbartonshire Educational Trust Scheme
1962 (4,557) 5,520 963
(1,020) 0 (1,020) McAuley Prize for Mathematics (1,114) 0 (1,114)
(10,272) 300 (9,972) Alexander Cameron Bequest 1,035 6,000 7,035
(1,154) 0 (1,154) UIE Award (1,259) 0 (1,259)
(16,662) 300 (16,362) Total (5,895) 11,520 5,625
Page 265

Page 154

West Dunbartonshire Trust funds
Draft Financial Statements for the year ended 31 March 2025 
7 | P a g e
Statement of Balances as at 31 March 2025
Opening
Balance
(Surplus)/
Deficit
Closing
Balance
Opening
Balance
(Surplus)/
Deficit
Closing
Balance
2023/24 2023/24 2023/24 2023/24 2023/24 2023/24
£ £ £ Note Other Assets £ £ £
(92,290) (4,216) (96,506)
Dunbartonshire Educational
Trust Scheme 1962 (96,506) 963 (95,543)
(22,333) (1,020) (23,353) McAuley Prize for Mathematics (23,353) (1,114) (24,467)
(14,485) (9,972) (24,457) Alexander Cameron Bequest (24,457) 7,035 (17,422)
(25,248) (1,154) (26,402) UIE Award (26,402) (1,259) (27,661)
(154,356) (16,362) (170,718) Total Other Assets (170,718) 5,625 (165,093)
Investment
(218) 0 (218) 5
Dunbartonshire Educational
Trust Scheme 1962 (218) 0 (218)
(103,020) 5,515 (97,505) 5 Alexander Cameron Bequest (97,505) (4,017) (101,522)
(103,238) 5,515 (97,723) Total Investment (97,723) (4,017) (101,740)
(92,508) (4,216) (96,724)
Dunbartonshire Educational
Trust Scheme 1962 (96,724) 963 (95,761)
(22,333) (1,020) (23,353) McAuley Prize for Mathematics (23,353) (1,114) (24,467)
(117,505) (4,457) (121,962) Alexander Cameron Bequest (121,962) 3,018 (118,944)
(25,248) (1,154) (26,402) UIE Award (26,402) (1,259) (27,661)
(257,594) (10,847) (268,441) 0 Overall Total (268,441) 1,608 (266,833)
All funds are unrestricted which means they may be used for any purpose relevant to the Trust Fund.
The draft Financial Statements were authorised for issue on 30 June 2025.
Signed on behalf of the Trustees by:- 
Councillor Martin Rooney
West Dunbartonshire Council
30 June 2025
Page 266

Page 155

West Dunbartonshire Trust funds
Draft Financial Statements for the year ended 31 March 2025 
8 | P a g e
Notes to the financial Statements
Note 1 - Basis of Accounting
The Financial Statements have been prepared on a receipts and payments basis and in accordance with the Charities
& Trustee Investment (Scotland) Act 2005 and the Charities Accounts (Scotland) Regulations 2006.  
Note 2 – Trustee Remuneration, Expenses and Related Party Transactions
No remuneration or expenses were paid to the Trustees or any connected persons during the 2024/25.
The Trusts received interest of £7,882 from the Council at 31 March 2025, and all transactions incoming and outgoing
are made via the Council’s bank accounts.
The Council has not charged the Trusts any fees for legal, financial or administrative services provided during the
year.
Note 3 – Grants
There were 11 grants awarded during 2024/25. Two awards of £3,000 by Alexander Cameron Bequest to Clydebank
East Community Council and Lomond & Clyde Care and Repair. There were 9 grants awarded by Dunbartonshire
Educational Trust Scheme to students at West of Scotland College.
Note 4 – Other Assets
During the year the Trust’s balances were held by the Council, which manages the administration of the funds on
behalf of the Trustees. No costs were incurred by the Trusts for this administration. The Council also acts as the
banker for the Trusts and, as detailed above, all transactions incoming and outgoing are made via the Council’s
accounts. The balances are repayable on demand. Interest is paid on balances.
Note 5 – Investment
Dunbartonshire Educational Trust - The investment valuation of £218 (shown in the table below) is the market value
as at 31 March 2016, as valued by the Council. Notification was received that the stocks were delisted in July 2016.
There has been no further update on this and therefore the assumption is that the market price remains the same.
Purchase Market Purchase Market
Price as at Price as at Price as at Price as at
31-Mar-24 31-Mar-24 31-Mar-24 31-Mar-24
£ £ Investment £ £
(289) (199) 4% Clydeport Authority (289) (199)
(35) (19) 3% Clydeport Authority (35) (19)
(324) (218) Total (324) (218)
Alexander Cameron – Following a decision on 23 February 2022, £20,000 was invested on a short term variable
basis, with the remainder (£100,269) invested on a longer term fixed interest rate basis with the Council for two years
at 2.04%. The closing value of the investment, including interest was £101,522.   
Note 6 – Audit Fee
The audit fee for the year of £10,000 (£10,000 2023/24) was absorbed by the Council.
Page 267

Page 156

DUMBARTON COMMON GOOD FUND APPENDIX 7
Statement of Income & Expenditure
23/24 24/25  24/25
Final Outturn Revised
Budget Final Outturn
Description  £ £  £
Alcoholics Anonymous - Grant for Property            14,502             24,997 26,438          
Alternatives             5,000              5,000 5,000            
Bellsmyre Digital Project            35,602             35,602 35,602          
Bellsmyre Schools Out                   -                      -   -                
Bellsmyre Development Trust            36,000             36,000 36,000          
Christmas Lights            15,000             15,000 15,000          
Dumbarton Senior Citizens            10,000             10,000 10,000          
Dumbarton Fireworks            12,369             12,864 12,864          
Town Centre Management - Capital & Revenue                   -             142,547 88,653          
Rockvale Rebound - Rent             2,600              2,630 2,630            
Scottish Maritime Museum            50,000             50,000 50,000          
Small Grants                   -                7,000 -                
West Dunbartonshire Citizen's Advice Bureau            40,000             40,000 40,000          
Central Admin Allocation            24,000             45,342 43,929          
Vacant Property Costs in relation to Overburn Ave            44,808             31,494 31,461          
Estates Dept - Management Fee             10,840             10,840 10,840          
WD Community Foodshare            17,403             18,403 17,403          
Dumbarton library resources            10,000             10,000 10,000          
Pipe Band Championships            50,000             50,000 50,000          
Food For Thought SCIO            16,251             15,000 15,000          
Corra Foundation            13,000             13,000 13,000          
Dalreoch United Free Church (Women's Fellowship)                645                    -   -                
DUMBARTON RIVERSIDE FOOTBALL CLUB 2,000            
ST AUGUSTINE'S EPISCOPAL CHURCH 6,500            
Total Expenditure          408,021           575,718           522,319
Interest on Revenue Balance / Investments -          24,548 -               361 7,329-            
Rental Income - External -         142,141 -         144,333 143,754-        
Rental Income - Internal -         177,750 -         177,750 177,750-        
Total Income -         344,439 -         322,445 -         328,833
Net Expenditure            63,582           253,273           193,486
Balance b/fwd -         624,896 -         561,314 -         561,314
Balance c/fwd -         561,314 -         308,041 -         367,828
Page 268