WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Regulatory and Regeneration 
Council: 26 March 2025
___________________________________________________________________ 
Subject: Feasibility Report re: Alternatives to the Scottish Government
Procurement Unit Framework IT Hardware and Software 
1. Purpose 
1.1 To report on the feasibility of the move away from the Scottish Government
Procurement Unit Framework for the supply of IT Hardware and Software as
proposed in motion agreed by Council at the meeting of 30 October 2024. 
2. Recommendations 
It is recommended that Council: 
2.1 Notes the contents of this report, and, 
2.2 Agrees to the continued utilisation of the Scottish Government Procurement
Unit frameworks for the supply of hardware and associated software where in
the professional opinion of the Chief Officer People & Technology, this
represents the Best Value solution for the Council. 
3. Background 
3.1 Council, at the meeting of 30 October 2024 agreed the following motion: 
“With the HP contract entering its final extension option with the Scottish
Government we should be looking at options, therefore Council agrees to
explore alternative procurement options/platforms open to the Council when
we purchase our IT hardware/software. 
HP currently provide all the hardware/software for the Israeli Defence Force in
Palestine, where to date 40,000 Palestinians have been killed by the IDF. 
Officers should report back to the Council on the feasibility of this move with
any potential costs/savings included.” 
3.2  The Council utilises the Scottish Government mobile client device framework
for laptops and the Scottish Government desktop client devices framework for
desktops both via HP Inc. UK Limited. The mobile client devices contract is
due to expire on 15th August 2025 and the desktop client devices framework
is due to expire on 31st August 2025. Scottish Government Procurement are
currently working collaboratively with all representatives across the Scottish
public sector to re-tender these requirements. 
3.3 The options for the Council would be:
ITEM 13

Page 2

• Utilise the next iteration of the Scottish Government framework agreement;
• Procure via an alternative framework such as Crown Commercial Services or
Yorkshire Purchasing Organisation; or
• Re-tender on our own in sufficient time to have a new contract in place prior to
expiry of this framework. 
3.4 This paper will look at the commercial feasibility of the above options in line
with the Scottish Procurement model of cost, quality, and sustainability best
value. 
4. Main Issues 
4.1 Cost 
4.1.1 The Crown Commercial Services RM6098 Tech Products framework has
catalogue pricing available for direct award for a large variety of suppliers and
models. Using this pricing as a comparison against similar units, this route
would increase costs by: 
• Laptops - £65k per annum based on previous year spend.
• Desktops - 35k per annum based on previous year spend.
• Total £100k per annum. 
4.1.2 The Yorkshire Purchasing Organisation Sustainable Hardware, Asset
Recycling and Data Destruction Framework has catalogue pricing available
for direct award for a variety of suppliers and models. Using this pricing as a
comparison against similar units, this route would increase costs by: 
• Laptops - £62k per annum based on previous year spend.
• Desktops - £98k per annum based on previous year spend.
• Total £160k per annum. 
4.2  An open tender for a West Dunbartonshire framework could in theory improve
upon these prices, however, even in the best-case scenario this would still be
likely to be considerably more expensive than the Scottish Government
framework. The Scottish Government framework also provides longer term
cost certainty as this Scotland-Wide bargaining power also allows for the
framework to dictate fixed pricing for the duration of the agreement. 
4.3 There would be additional costs to support an independent tendering exercise
given the complexity. As a minimum, this would require an experienced
member of the ICT team to develop a specification. It should be noted that
requirements are not only related to the hardware itself, but also a number of
additional services related to roll out (logistics, asset tagging, imaging, user
guidance etc), sustainability and disposal. An additional two ICT resources
would be required for evaluation and a procurement resource would be
required. Assuming a 3-month mini competition this would equate to:

Page 3

Team Role Duration
(weeks)
Grade Total Cost
Procurement Procurement
Support
12 8 £9,921
ICT Specification
and
Evaluation
12 8 £9,921
ICT Evaluation 4 8 £3,307
ICT Evaluation 4 8 £3,307  
32 weeks 8 £26,457 
4.4 Sustainability – the Scottish Government Framework can dictate that the
latest models are offered via the framework and that priority of sales of these
models is given to framework members where there is limited supply. This
ensures a higher level of sustainability wins due to energy efficiency
improvements of new models as the higher computing power of the newer
models provides a longer lifespan and therefore less recycling requirements.
This is demonstrated in that the exact model currently being purchased by the
Council via the Scottish Government framework is not currently available on
the Crown Commercial Services framework. A move to an older model device
would mean the refresh rate for laptop replacement would need reduce from 5
years (as per ICT Strategy 2023-28) to 3 years. This would be at an increased
cost of £333k per annum. The economies of scale allow HP to commit to
account management, operations, pricing, and order management teams
based in Glasgow with a long-standing sub-contract for warehousing and roll
out services based in Livingston via XMA Ltd. 
4.5 Quality – The professional view of the HP units is that they represent high
quality with low incidence of faults with an enhanced warranty in place as part
of the agreement. As noted in the sustainability section – the spend level
gives priority access to supply of newer models, this also provides a quality
advantage in that all core commercial devices under the framework have
between a 12–18-month lifecycle and guaranteed spare parts for up to 5
years after device end of sale date helping to maximise product lifespan.
Orders under the framework agreement are given precedence over other
orders which is extremely useful in situations where supply chains are
stretched (this was a notable advantage due to global supply chain issues
with chipset production in previous years. Older models have lower
specification and processing power which would impact on output of Council
employees and devices would not meet the demands of modern software and
use of new technologies such as artificial intelligence and latest Windows
operating systems. 
4.6 Logistics - Orders under the framework agreement are given precedence over
other orders which is extremely useful in situations where supply chains are
stretched (this was a notable advantage due to global supply chain issues
with chipset production in previous years).

Page 4

4.7 Limitations on ability to restrict the market - the Public Contracts (Scotland)
Regulations 2015 require that all potential suppliers must be treated equally
and without discrimination. This means that a company could only be
excluded from bidding for a contract if the Council were to proceed by tender
in its own right if it met one of the grounds in procurement legislation
permitting its exclusion or, in the case of a contract already awarded, there
was a material breach of the terms of that contract warranting termination. 
Scottish Government have further stated that they are not aware of any such
grounds for exclusion or breach of contract in relation to the current
Framework Agreements with HP Inc UK Ltd. Therefore, not only could HP Inc
UK Ltd bid for any tender the Council may issue but given they have been
successful in proving best value for the previous two national frameworks,
would likely be highly competitive.  Any move to unlawfully exclude them
would be likely to result in the setting aside of any contract and potentially a
fine and substantial damages awarded to HP Inc UK Ltd. It should also be
noted that direct award to another supplier from Crown Commercial Services
or Yorkshire Purchasing Organisation frameworks is possible. However, as
detailed below, this would be at additional cost. 
5. Options Appraisal 
5.1 Cost
The Scottish Government mobile client device framework delivers substantial
value for money on laptops and desktops due to the economies of scale in
having buy in from the vast majority of the public sector in Scotland. The
below table summarises pros and cons of the possible routes to market: 
Route to
Market
Pro’s Con’s  HP Laptop
Model Used
for Price
Comparison
HP Desktop
Model Used
for Price
Comparison
Scottish
Government
mobile client
device
framework
Developed
specifically
for Scottish
public sector
laptops
requirements.
See section
above.
No
commercial
cons
HP EliteBook
640
G11 Series
Intel ultra 5
upgraded to
16GB RAM
3 year on-site
warranty
Elite 800 G9
SFF Intel i5-
13500 – HDD
512GB SSD
16GB RAM 3
year on-site
warranty
Crown
Commercial
Services
(via mini
competition)
RM6098
Tech
Products –
Lot 2 (NB
route also
In
comparison
to Open
tender – pre-
agreed terms
and
conditions
As detailed
above in
cost, quality,
logistics and
sustainabilit
y sections.
Mixture of
manufacture
rs and
resellers on
HP EliteBook
640
G11 Series
Intel ultra 5
upgraded to
16GB RAM*  
Elite 800 G9
SFF Intel i5-
13500 – HDD
512GB SSD
16GB RAM *

Page 5

used by
ESPO)
the
framework
(Including
HP).
However,
may
unnecessari
ly exclude
some
manufacture
rs
YPO
Sustainable
Hardware,
Asset
Recycling
and Data
Destruction
Framework
- 1161 via
mini
competition
In
comparison
to Open
tender – pre-
agreed terms
and
conditions 
As detailed
above in
cost, quality,
logistics and
sustainabilit
y sections.
Suppliers
are re-
sellers who
add their
own uplift
(Softcat,
XMA etc) 
HP EliteBook
640 14 G9 i5-
1235U 16GB
RAM**
HP Elite 800
G9 SFF
Intel® Core™
i5 i5-12500 8
GB DDR5-
SDRAM 256
GB***
Open
Tender
Most
transparent
option
Same
issues as
Crown
Commercial
Services,
with added
complication
that terms
and
conditions
would need
to be
agreed with
little
bargaining
power
assumed
similar costs
to Crown
Commercial
but may be
higher due to
additional
supplier
tendering
costs
assumed
similar costs
to Crown
Commercial
but may be
higher due to
additional
supplier
tendering
costs) 
* Crown Commercial Services has a 1-year parts only warranty rather than 3-
year next business day response, onsite, parts and labour. So, costs would be
more expensive than this. 
** YPO supplier pricing does not detail warranty provided. This is an older
model G9 variant – the framework did not have direct award pricing for G11
model.

Page 6

*** YPO supplier pricing does not detail warranty provided. This is the closest
direct comparison the framework. This model would require increased RAM
(8GB-16GB) and storage space (256GB-512GB) to be comparable to current
model purchased via Scottish Government 
5.2 It should be noted for reasons of commercial confidentiality that line-item
pricing has been removed from this report. However, the overall impact of
pricing would be: 
Laptop additional cost = £138k 
Desktop additional cost = £224k 
Total Additional cost per annum = £362k
This illustrates the significant economies of scale achieved by the current
Scottish Government framework. 
5.3 Cost Against Other Manufacturers
The table below summarises the models of similar specification used for
comparison of pricing of other manufacturers. This is a high-level comparison
for: laptops operating Windows 11 Pro, intel ultra 5 processor, 16GB RAM
and 256Gb storage and for small form factor desktops operating Windows 11
Pro, i5 processor, 16GB RAM and 512Gb storage utilising the latest models
available for each manufacturer. Other factors are considered during the
national framework such as energy efficiency, robustness against accidental
damage etc. 
Laptop
Manufacturer Scottish
Government
Crown
Commercial
Services 
YPO
HP EliteBook 640
G11
EliteBook 640
G11
EliteBook 640
G11
Lenovo N/A ThinkPad E16
Gen 2 21MA
ThinkPad E16
Gen 2 21MA
(only 8GB RAM) 
Microsoft N/A Surface Laptop 6 Surface Laptop 5
Samsung N/A Galaxy Book4
Pro
Galaxy Book4
Pro 
Desktop
Manufacturer Scottish
Government
Crown
Commercial
Services 
YPO
HP 800 G9 SFF 800 G9 SFF 800 G9 SFF
Dell N/A OptiPlex 7020 OptiPlex 7010
Acer N/A Veriton X2
VX2720G
Veriton X2
VX2720G  only
8GB RAM

Page 7

Lenovo N/A ThinkCentre
M70s Gen 4
12DT
ThinkCentre
M70s Gen 3
12DT 
5.4 It should be noted for reasons of commercial confidentiality that line item
pricing has been removed from this report. However, the overall impact of
pricing is included below. 
Analysis of pricing of the units above, highlights that the framework pricing for
Laptops via the Scottish Government framework is extremely competitive.
There is also a reasonable cost advantage for desktop units. Against the next
cheapest models, costs of switching would be: 
Laptop additional cost = £65k 
Desktop additional cost = £35k 
Total Additional cost per annum = £100k 
5.5 Given this cost differential, economically it would be cost effective to continue
with the current Scottish Government framework offering. Further analysis
could be conducted to see pricing against the new frameworks for go live in
August 25. However, historically they have provided the best value. 
5.6  Additional Service Offerings Provided By HP Inc UK Ltd 
It should also be noted that the above cost savings are only part of the overall
benefits provided by the Scottish Government Framework. Deployment,
recycling, and disposal services are offered by HP Inc UK Ltd’s Scottish
based sub-contractor XMA. These added value services are extremely
beneficial for our teams as device deployments can be extremely resource
intensive, particularly given approval of 4 FTE reductions in the team as part
of Council savings exercise 25/26. These services include: 
• Device Enrolment 
• Image Loading
• Asset Tagging
• BIOS Configuration
• Deinstall and Hardware Recycling
• Secure Sanitisation of Storage Media (wipes data to certified standards
to allow recycling) 
These services were more expensive via YPO framework than SG framework.
It should be noted that for the YPO framework, only some suppliers provide
details of these costs for direct award. The above shows pricing for the
supplier (Nexus Fusion) as they offer the closest comparable HP Laptop
device. Also these rates are not available via Crown Commercial Services
Framework 
6. People Implications

Page 8

6.1 Older models have lower specification and processing power which would
impact on output of Council employees and devices would not meet the
demands of modern software and use of new technologies such as artificial
intelligence and latest Windows operating systems. 
6.2 No additional resource issues are anticipated should the recommendation to
move to the new Scottish Government framework (when in place) be followed. 
7. Financial and Procurement Implications 
7.1 It is estimated that the impact on the Council would be an increase of £100k.
It should be noted that this does not account for non-cashable benefits such
as increased officer delivery. 
7.2 Some areas of our current specification would be delivered at additional cost if
included in an open tender, mini-competition or direct award, whereas some
could not be provided as we do not have the economies of scale to dictate
provision. One key feature of the national framework agreement is that it has
achieved fixed pricing over the duration of the framework – this is something
that would be difficult to negotiate individually without significant cost
increases. 
7.3 Officers’ view is that from a commercial standpoint best value for the Council
would be in utilising the new Scottish Government framework due to the
significant economies of scale. It should be noted that the new framework is
being tendered via an open process and there is no guarantee that HP will be
the supplier of the new framework. Nonetheless by tendering ourselves, we
would be virtually certain to lose the economies of scale and in any case, we
would have to consider an HP bid which they would be in a strong position to
bid competitively.   
8. Risk Analysis 
8.1 A switch from the Scottish Government framework, in its current or future
incarnation would have a substantial impact on costs, employee productivity
and sustainability. These are captured above. 
8.2 None of the other options noted above are likely to offset such disadvantages. 
8.3 As noted above, any attempt to exclude HP Inc UK Ltd from an open tender
would be likely to result in fines and damages and officers would not be able
to legally proceed with an award in such circumstances, leaving the Council
without a supplier for essential equipment. 
9. Equalities Impact Assessment (EIA) 
9.1  A full EIA assessment has been conducted and there is no impact on any
group for alternative technology spend plans.

Page 9

9.2  The annual device replacement project will continue to include delivery of
specialist ICT equipment/adaptations for Council employees and pupils with
additional needs as required. This will also apply where public access devices
are being replaced. Any alternative procurement process will be conducted in
line with the Council’s procurement and equality guidance, and
implementation planning will consider equality issues. 
9.3  The Councils approach to supporting change and improvements, consider
accessibility and usability of systems and their interaction for users. This is
especially important for disabled people however not limited to this protected
characteristic. The Council are Duty bearers in terms of the Human Rights
Act, and duties cover both people and legal persons such as companies that
supply or might supply goods and services to the Council. The suggested
approach does not breach these duties. 
9.4  The proposed approach does not involve any negative impacts in terms of
Equal Act considerations, including the Procurement Duty of the Public Sector
Equality Duty in Scotland, the Fairer Scotland Duty or obtaining Best Value.
Where possible the Council will use social benefit clauses, when looking at its
procurement. 
10. Environmental Sustainability 
10.1 Scottish Procurement consider a number of sustainability criteria within their
requirements – this includes materials and energy usage.  These could be
met under selection of units for direct award and from inclusion of
requirements under framework and mini-competition process. 
11. Consultation 
11.1 This paper included input from Chief Officer People & Technology and Chief
Officer Resources. 
12. Strategic Assessment 
12.1 Ensuring best value ICT devices supports Council and officers in delivery of
the five strategic priorities of the Council’s Strategic Plan. 
Alan Douglas
Chief Officer
Date: 5/3/25 
Person to Contact: Iain Skene – Procurement Manager 
e-mail: iain.skene@west-dunbarton.gov.uk 
James Gallacher – Service Manager - ICT
E-mail: james.gallacher@west-dunbarton.gov.uk

Page 10

Appendices: Appendix 1 Equality Impact Assessment 
Background Papers: Frameworks referred to within the paper:
Scottish Government - mobile client devices framework (SP-19-020)
Scottish Government - desktop client devices framework (SP-22-019) 
Wards Affected: All wards.

Page 11

Assessment No 1249 Owner JGALLACHER                           
Resource Transformation Service People and Technology
FirstName Surname Job Title
Head Officer James Gallacher ICT Manager
Members James Gallacher, ICT Manager
Iain Skene, Procurement Manager 
(Please note: the word 'policy' is used as shorthand for strategy policy
function or financial decision)
Policy Title ICT Procurement
The aim, objective, purpose and intended out come of policy
To report on the feasibility of the move proposed in motion raised by Councillor Bollan
at the Council meeting of 30.10.24.
“With the HP contract entering its final extension with the Scottish Government we
should be looking at options, therefore Council agrees to explore alternative
procurement options/platforms open to the Council when we purchase our IT
hardware/software. HP currently provide all the hardware/software for the Israeli
Defence Force in Palestine, where to date 40,000 Palestinians have been killed by the
IDF. 
Officers should report back to the Council on the feasibility of this move with any
potential costs/savings included.”
The Council uses the Scottish Government mobile client device framework for laptops
via HP. This contract is due to expire on 15th August 2025. Scottish Government
Procurement are currently collaborating with all representatives across the Scottish
public sector to re-tender this requirement
Service/Partners/Stakeholders/service users involved in the development
and/or implementation of policy.
Consultation with Chief Officers,
Performance & Strategy
Does the proposals involve the procurement of any goods or services? Yes
If yes please confirm that you have contacted our procurement services to
discuss your requirements.
Yes
SCREENING
You must indicate if there is any relevance to the four areas
Duty to eliminate discrimination (E), advance equal opportunities (A) or
foster good relations (F)
No
Relevance to Human Rights (HR) Yes
Relevance to Health Impacts (H) No
Relevance to Social Economic Impacts (SE) Yes
Who will be affected by this policy?
Council employees, Council service users
APPENDIX 1

Page 12

Who will be/has been involved in the consultation process?
Chief Officers

Page 13

Please outline any particular need/barriers which equality groups may have in relation to
this policy list evidence you are using to support this and whether there is any negative
impact on particular groups.
Specific group to
consider
Needs Evidence Impact
Age                          
Disability                    .
Gender Reassign              
Marriage & Civil
Partnership 
Pregnancy &
Maternity        
Race                         
Religion and Belief          
Sex                          
Sexual Orientation 
Human Rights                  The Council is a Duty
bearer in terms of the
Human Rights Act (HRA).
The HRA protects the rights of
every person resident in the
UK regardless of whether or
not they are a British citizen or
a foreign national, a child or an
adult, a prisoner or a member
of the public. It also applies to
legal persons, such as
companies.
The proposed approach
would not exclude
companies from bidding
into the process, thus
would not breach the
Human Rights of
Companies as Legal
persons
Health                     
Social & Economic
Impact     
The Council has a duty to
obtain Best Value.
The Council must keep in
mind the Fairer Scotland
Duty when making strategic
financial decisions. 
Reducing the costs associated
with technology.
Where possible the Council will
use social benefit clauses,
when looking at its
procurement.
We will ensure under any
options that Council Guidance
on Equality and Procurement is
followed, including seeking
Social benefits
Positive impact for
Council finances.
Any option would seek
to secure social benefits.

Page 14

Cross Cutting          Procurement Act 2023
Contracting authorities must
treat suppliers equally,
unless there is a justified
reason for different
treatment. No unfair
advantages or
disadvantages will be given
to suppliers, with equal
access to information and
opportunities for each
procurement. You can rest
assured that procurement
decisions will be made
without bias, and as long as
you can deliver the
requirements stated, you
have a fair chance of
success.
The Council need to take
into account how spending
decisions may cross cut.
We will therefore always
check potential relevance to
any and all of the protected
groups above, depending
on proposals in question.
Procurement Act 2023 and
Human Rights considerations
cross cut
Our approach to supporting
change and improvements, will
proactively take into account
accessibility and usability of
systems and their interaction
for users. This is especially 
important for disabled people.
Specific implementations can
be impact assessed by
services
The Council will ensure
that all relevant
spending proposals are
informed by evidence 
and take into account all
the relevant areas
covered by our approach
to impact assessment
and
Positive

Page 15

Actions

Page 16

Policy has a negative impact on an equality group,but is still to be implemented, please
provide justification for this.
Will the impact of the policy be monitored and reported on an ongoing bases?
Q7 What is you recommendation for this policy?
Please provide a meaningful summary of how you have reached the recommendation
EIA 1249:  We are Duty bearers in terms of the Human Rights Act, and duties cover both people
and legal persons such as companies that supply or might supply goods and services to the
Council. The suggested approach does not breach these duties.
The proposed approach does not involve any negative impacts in terms of Equality Act
considerations, including the Procurement Duty of the Public Sector Equality Duty in Scotland,
the Fairer Scotland Duty or obtaining Best Value. Where possible the Council will use social
benefit clauses, when looking at its procurement.