Changes to Capital Plan and Implications at P10 Appendix 3
RESOURCES
Project - RES 2 (Underspend)
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cash Receipting system enhancements (25) (25) 0 0 0 0 0 0 0 0 (25)
Cash Receipting system enhancements Revised 0 0 0 0 0 0 0 0 0 0
Explanation
Project complete, cost less than anticipated.  
Project - RES 3 (Underspend)
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Agresso Development (10) 40 0 0 0 0 0 0 0 0 30
Agresso Development - Revised 30 0 0 0 0 0 0 0 0 30
Explanation
Project near completion and costs less than anticipated.
Project - RES 9 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Strathleven Place (1,500) 1,590 0 0 0 0 0 0 0 0 1,590
Strathleven Place - Revised 90 1,500 0 0 0 0 0 0 0 1,590
Explanation
Project delayed due to internal resources.
Project - RES 10 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
New Sports Changing Facility Dumbarton West (Old OLSP site)  (340) 340 0 0 0 0 0 0 0 0 340
New Sports Changing Facility Dumbarton West (Old OLSP site)   -
Revised 0 340 0 0 0 0 0 0 0 340
Explanation
Programme has been delayed due to redevelopment of wider site.

Page 2

Changes to Capital Plan and Implications at P10 Appendix 3
Project - RES 11 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Building Upgrades and H&S - lifecycle & reactive building upgrades 80 3,122 2,781 2,781 2,781 2,781 2,781 2,781 2,781 2,781 25,370
Building Upgrades and H&S - lifecycle & reactive building
upgrades - Revised 3,202 2,781 2,701 2,781 2,781 2,781 2,781 2,781 2,781 25,370
Explanation
Acceleration of £80k budget required from 26/27 into 24/25 for retention invoices pertaining to District Heating.
Project - RES 13 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Depot Rationalisation 1,000 500 2,000 4,351 0 0 0 0 0 7,851
Depot Rationalisation - Revised 1,500 2,000 4,386 0 0 0 0 0 7,886
Explanation
Budget realignment to depot rationalisation at Overburn Avenue and Bridge Street efficiency savings. 
Project - RES 15 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Finance Ledger System (80) 100 350 550 0 0 0 0 0 0 1,000
Finance Ledger System - Revised 20 430 550 0 0 0 0 0 0 1,000
Explanation
Project only at initiation stage moving towards a high level options appraisal. Only minimum expenditure anticipated during current financial year.

Page 3

Changes to Capital Plan and Implications at P10 Appendix 3
REGULATORY & REGENERATION
Project - RR 6 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Regeneration/Local Economic Development (165) 375 2,232 2,055 760 500 500 500 500 500 7,922
Regeneration/Local Economic Development - Revised 210 2,232 2,220 760 500 500 500 500 500 7,922
Explanation
These are multi-year programmes of work/projects that are subject to external factors.
Project - RR 7 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Regeneration Fund (615) 615 1,530 974 705 0 0 0 0 0 3,824
Regeneration Fund - Revised - 2,145 974 705 0 0 0 0 0 3,824
Explanation
These are multi-year programmes of work/projects that are subject to external factors.
Project - RR 8
Deferred Grant
Funds
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Place Based Investment Programme 100 3 309 0 0 0 0 0 0 0 409
Place Based Investment Programme - Revised 3 406 0 0 0 0 0 0 0 409
Explanation
Project - RR 10 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
LUF (3,808) 9,133 6,197 0 0 0 0 0 0 0 15,330
LUF - Revised 5,325 10,005 0 0 0 0 0 0 0 15,330
Explanation
Project delivery extended due to longer than anticipated project development and procurement timescales.
Project is supported by the Clydebank Town Board and its delivery and future maintenance is linked to 3 Year Investment Plan as agreed by the Board and Long Term Plan for Town funding timescales.

Page 4

Changes to Capital Plan and Implications at P10 Appendix 3
Project - RR 13 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Clyde Mission Catalyst Fund (1,027) 1,197 388 0 0 0 0 0 0 0 1,585
Clyde Mission Catalyst Fund - Revised 170 1,415 0 0 0 0 0 0 0 1,585
Explanation
Project delivered by an external partner, progress subject to external factors.
Project - RR 14 Overspend
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Securing Sites 59 7 0 0 0 0 0 0 0 0 66
Securing Sites - Revised 66 0 0 0 0 0 0 0 0 66
Explanation
Securing sites to make safe. The council plans to recoup costs from owners where appropriate.
ROADS & NEIGHBOURHOOD
Project - RN 17 Overspend
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Posties Park Sports Hub 333 507 0 0 0 0 0 0 0 0 840
Posties Park Sports Hub - Revised 840 0 0 0 0 0 0 0 0 840
Explanation
Project - RN 19 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cemetery Extension, North Dalnotter (250) 250 0 0 0 0 0 0 0 0 250
Cemetery Extension, North Dalnotter Revised 0 250 0 0 0 0 0 0 0 250
Explanation
Additional funding required for contractor retentions, and ongoing running costs for utilities.  Budget shortfall will ensure project completion and long term, sustainability of the project.
Project designs being developed with Roads Service. Works planned to commence July 2025.

Page 5

Changes to Capital Plan and Implications at P10 Appendix 3
Project - RN 20 Overspend
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Vale of Leven Cemetery 26 61 0 0 0 0 0 0 0 0 87
Vale of Leven Cemetery - Revised 87 0 0 0 0 0 0 0 0 87
Explanation
Project - RN 21 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Allotment Development 4 150 127 0 0 0 0 0 0 0 277
Allotment Development - Revised 154 123 0 0 0 0 0 0 0 277
Explanation
Project - RN 22 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Waste Transfer Station 1,821 159 1,821 0 0 0 0 0 0 0 1,980
Waste Transfer Station - Revised 159 0 0 1,821 0 0 0 0 1,980
Explanation
Project - RN 23 Funding
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Play Area Upgrade Programme 508 417 100 100 100 100 100 100 100 133 1,758
Play Area Upgrade Programme Revised 417 641 100 100 100 100 100 100 100 1,758
Explanation
Overspend.  Additional fill material required to comply with planning/SEPA requirements.
Project design for Overburn Allotments being finalised with an estimated start date of June 2025.
Additional Funding confirmed from Scottish Government and services for expenditure incurred in 2025/26.
The outline design has been completed and the construction cost is significantly higher than the available budget.  In addition following the implementation of the Net Zero Cooperation Agreement the council now
has resilience and this will be monitored and reported to council to consider whether the project is still required.

Page 6

Changes to Capital Plan and Implications at P10 Appendix 3
Project - RN 25 Underspend
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Whitecrook Tennis Court Up-grade (14) 1 0 0 0 0 0 0 0 0 1
Whitecrook Tennis Court Up-grade Revised 1 0 0 0 0 0 0 0 0 1
Explanation
Project - RN 28 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balloch Mountain Bike Track (80) 100 350 0 0 0 0 0 0 0 450
Balloch Mountain Bike Track - Revised 20 430 0 0 0 0 0 0 0 450
Explanation
Project - RN 30 Underspend
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Kilmaronock Cemetery Extension (8) 13 0 0 0 0 0 0 0 0 5
Kilmaronock Cemetery Extension - Revised 5 0 0 0 0 0 0 0 0 5
Explanation
Project - RN31 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Exxon 2,000 2,500 20,000 11,607 4,056 0 0 0 0 0 40,163
Exxon Revised 4,500 20,000 10,970 4,693 0 0 0 0 0 40,163
Explanation
Ecological and Planning issues have delayed the final design development.
Project complete, cost less than anticipated.  
Project delivered under budget.
The reason for reprofiling is that the construction costs increased significantly which prompted a scope review to allow the project affordability.  The Project Board recommended reducing the original scope which
was agreed at the Council meeting on 30 October 2024.  The overall budget has increased to £46,942,156, which will be split between City Deal £23.991m and Council £22.951m. The total budget has been
profiled to reflect the 30 October 2025 Council report.

Page 7

Changes to Capital Plan and Implications at P10 Appendix 3
Project - RN32 New Funding
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cycling, Walking, Safer Routes Tier 1 (Active Travel) 387 645 0 0 0 0 0 0 0 0 1,032
Cycling, Walking and Safer Routes Tier 1 (Active Travel) 645 387 0 0 0 0 0 0 0 1,032
Explanation
Additional funding from Scottish Government for 25/26.
Project - RN 33 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Creation of 3 new all weather pitches at Argyll Park, Posties Park
and Mountblow playing fields. (450) 500 1,750 0 0 0 0 0 0 0 2,250
Creation of 3 new all weather pitches at Argyll Park, Posties
Park and Mountblow playing fields - Revised 50 2,200 0 0 0 0 0 0 0 2,250
Explanation
Project - RN 34 New Funding
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Strathclyde Partnership for Transport - Bus, cycling and walking
infrastructure improvements & Park and Rides 23 310 0 0 0 0 0 0 0 0 333
Strathclyde Partnership for Transport - Bus, cycling and walking
infrastructure improvements & Park and Rides - Revised 333 0 0 0 0 0 0 0 0 333
Explanation
Project - RN 35 New Funding
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Transport Scotland 24-25 Implementation 20MPH Speed Limits 105 0 0 0 0 0 0 0 0 0 105
Transport Scotland 24-25 Implementation 20MPH Speed Limits
Revised 105 0 0 0 0 0 0 0 0 105
Explanation
There are 2 sites progressing in first phase, the 3rd site is no longer suitable therefore the service will engage with the leisure trust to identify an alternative.
Additional funding from Scottish Government.
Additional funding received from the Scottish Government funding to improve & support connectivity and equal access to Public transport and infrastructures for cycling.

Page 8

Changes to Capital Plan and Implications at P10 Appendix 3
Project - RN 36 New Funding
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Review of Schools speed limits 75 0 0 0 0 0 0 0 0 0 75
Review of Schools speed limits Revised 0 75 0 0 0 0 0 0 0 75
Explanation
EDUCATION
Project - EDUC 3 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Schools Estate Improvement Plan - next Phase - Faifley Campus 5,715 15,181 16,089 2,754 0 0 0 0 0 0 34,024
Schools Estate Improvement Plan - next Phase - Faifley Campus -
Revised 20,896 10,374 2,754 0 0 0 0 0 0 34,024
Explanation
Project EDUC 5 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Free School Meals Expansion (1,191) 1,191 0 0 0 0 0 0 0 0 1,191
Free School Meals Expansion Revised 75 1,116 0 0 0 0 0 0 0 1,191
Explanation
HSCP
Project - HSCP 2 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
ICT Modernisation HSCP (13) 63 459 370 125 125 125 125 125 151 1,668
ICT Modernisation HSCP - Revised 50 141 259 259 200 190 190 190 189 1,668
Explanation
Following transition of design team to Resources, a reprofiling of budget required over financial years was carried out and as a result acceleration of £5.715m budget was required from 25/26 into 24/25 to align with
spend profile.  Programme of works is currently ahead of schedule.
Project delayed due to late confirmation of grant which prevented the programming of works.  Works required to be carried out during recess periods.
Additional funding received from the Scottish Government funding to review speed limits around schools as part of Asset Management Plan.
Expenditure in 2024/25 is less than expected.

Page 9

Changes to Capital Plan and Implications at P10 Appendix 3
Project - HSCP 3 Reprofiling
Current Year
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Total Capital
Plan
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Community Alarms 118 155 339 66 66 55 54 54 54 54 897
Community Alarms - Revised 273 339 40 40 40 41 43 42 39 897
Explanation
Reprofiling spend to reflect updated timescales following procurement of system.