Democracy Spraffa

Document Pack (Bookmarked)

West Dunbartonshire Council · 26 August 2026
Back to West Dunbartonshire Council — 26 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda 
West Dunbartonshire Council 
Date:  Wednesday, 26 August 2026
___________________________________________________________________ 
Time:  16:00
___________________________________________________________________ 
Format:      Hybrid meeting 
___________________________________________________________________ 
Contact:    Carol-Ann Burns, Senior Democratic Services Officer  
Email: carol-ann.burns@west-dunbarton.gov.uk   
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of West Dunbartonshire Council as detailed above.   
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive 
Page 1

Page 2

Distribution:- 
Provost Karen Murray Conaghan Councillor June McKay
Councillor James Bollan  Councillor John Millar
Councillor Kevin Crawford Councillor Lawrence O’Neill
Councillor Ian Dickson Councillor Lauren Oxley
Councillor Diane Docherty Councillor Chris Pollock
Councillor Fiona Hennebry Councillor Martin Rooney
Councillor Gurpreet Singh Johal Councillor William Rooney
Councillor Daniel Lennie Councillor Gordon Scanlan
Councillor David McBride Councillor Hazel Sorrell
Councillor Jonathan McColl Councillor Clare Steel
Councillor Michelle McGinty Councillor Sophie Traynor   
Chief Executive
Chief Officers 
Date of issue: 13 August 2026 
Audio Streaming 
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and the
Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including, but
not limited to, for the purpose of keeping historical records and making those records
available via the Council’s internet site. 
Page 2

Page 3

WEST DUNBARTONSHIRE COUNCIL 
WEDNESDAY, 26 AUGUST 2026 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING 
The Chair will be heard in connection with the above. 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on the agenda and the reasons for such declarations. 
4 RECORDING OF VOTES 
The Council is asked to agree that all votes taken during the meeting will be
carried out by roll call vote to ensure an accurate record. 
5 MINUTES OF PREVIOUS MEETING      9 – 24   
Submit, for approval as correct record, the Minutes of Meeting of West
Dunbartonshire Council held on 17 June 2026. 
6 OPEN FORUM   
The following Open Forum question has been submitted:- 
Question from Sister Rita Dawson MBE  
Council recognises the significant contribution that St Margaret of Scotland
Hospice makes to the local community, by providing compassionate care and
support to those living with life-limiting illness and their families. 
Council is asked whether it wishes to reaffirm its on-going support for the
Hospice and to confirm its ongoing commitment to supporting Sister Rita, the
staff, volunteers and all at St Margaret of Scotland Hospice as it moves
forward into its Next Chapter, ensuring that its important legacy and vital
services continue for future generations.
7/
Page 3

Page 4

7 AUDITED 2024/25 WEST DUNBARTONSHIRE COUNCIL       TO FOLLOW
ANNUAL ACCOUNTS 
Submit report by the Chief Officer – Resources providing Members with the
opportunity to scrutinise and approve the 2024/25 Audited Annual Accounts
for West Dunbartonshire Council. 
8 2024/25 WEST DUNBARTONSHIRE COUNCIL ANNUAL   25 – 139
AUDIT REPORT 
Submit report by the Chief Officer – Resources:- 
(a) providing the 2024/25 Annual Audit Report to Members and the
Controller of Audit prior to approving the 2024/25 Audited Annual
Accounts for the Council; and 
(b) providing an update on the external audit of the Council’s Annual
Accounts for the year ended 31 March 2025. 
9  FINANCIAL REGULATIONS UPDATE         141 – 197 
Submit report by the Chief Officer – Resources seeking approval of West
Dunbartonshire Council’s revised Financial Regulations. 
10 LONG TERM FINANCIAL STRATEGY      199 – 226 
Submit report by the Chief Officer – Resources updating the Council’s long
term financial strategy which was last updated in December 2023. 
11 QUARTERLY TREASURY MANAGEMENT UPDATE TO    227 – 234
30 JUNE 2026 
Submit report by the Chief Officer – Resources providing an update on
Treasury Management activity for the first quarter of the 2026/27 financial year
from 1 April 2026 to 30 June 2026. 
12 GENERAL SERVICES REVENUE BUDGETARY CONTROL  235 – 262
REPORT TO 30 JUNE 2026 (PERIOD 3)   
Submit report by the Chief Officer – Resources advising of the 2026/27
Revenue Budget position at 30 June 2026 and the forecast position of the
General Fund Reserve as at 31 March 2027. 
13/
Page 4

Page 5

13 GENERAL SERVICES CAPITAL BUDGETARY CONTROL    263 – 281
REPORT 2026/27 TO 30 JUNE 2026 (PERIOD 3)   
Submit report by the Chief Officer – Resources providing an update on the
General Services capital financial performance to 30 June 2026. 
14 HOUSING REVENUE ACCOUNT BUDGETARY CONTROL   283 – 288
REPORT TO 30 JUNE 2026 (PERIOD 3) 
Submit report by the Chief Officer – Resources advising on the 2026/2027
HRA revenue budget position on 30 June 2026 and the forecast position for
HRA reserves on 31 March 2027. 
15 HOUSING REVENUE ACCOUNT (HRA) CAPITAL BUDGETARY   289 – 296
CONTROL REPORT TO 30 JUNE 26 (PERIOD 3)   
Submit report by the Chief Officer – Resources providing an update on the
HRA capital programme to 30 June 2026. 
16 NOTICE OF MOTIONS 
(a) Motion by Councillor Jim Bollan – Assessment of Medical
Applications 
Council agrees to an urgent review of the number of officers assessing
medical applications from housing applicants seeking a suitable Council
tenancy. 
It is currently taking around 5-6 months to process these requests,
which is completely unacceptable given the broad range of medical
conditions these applicants have; to do this, we need to recruit
additional staff with the cost being funded from HRA reserves. 
A report back to the next Council meeting should be arranged. 
(b)  Motion by Councillor Lawrence O’Neill – Yoker Athletic Football
Club’s 140th Anniversary 
Council congratulates Yoker Athletic Football Club on this, their 140th
Anniversary, having been founded in 1886. 
Most of that period has been spent playing at Holm Park, Clydebank. 
Council acknowledges the important part that they have played in
grassroots football and promotion of sport within the community. 
Page 5

Page 6

Winners of the Scottish Junior Cup in 1932/33 season and finalists
again in 1935/36 and most recently in season 2021/22. 
Having gained promotion at the end of last season, they are now
playing from a further redeveloped Holm Park and in West of Scotland
Football League Division 2 and (at time of motion submission) have a
100% record thus far. 
Council congratulates all who have been involved in the club since its
formation in 1886 and thanks all volunteers, committee members,
players, staff and their supporters and would ask if the Council, through
the Provost’s office, could provide some small token of appreciation on
this 140th Anniversary. 
(c)  Motion by Councillor Lawrence O’Neill – Faifley Parish Church
Anniversaries 
Council congratulates the congregation and members of the Faifley
Parish Church who will celebrate the 70th Anniversary of the Church
Hall and 60th Anniversary of the White Church, on the weekend of
Saturday, 19th and Sunday, 20th September this year. 
Now officially known as Faifley & Duntocher Parish Church, following a
recent merger with Duntocher Trinity Church, they play a huge role
within the community – many services, weddings and funerals have
been undertaken by the Reverend Gregor McIntyre and his
predecessors. 
The buildings also host Faifley Upcycling; Faifley Foodshare & Pantry;
wider social roles with Street Connect; Support to the African
community and other New Scots; various clubs and groups as well as
assisting the Council deliver Shine and Summer activities within the
area. 
During the Covid-19 pandemic which closed our schools, they were
willing volunteers to help us ensure that the local school children were
fed throughout periods of closure. 
The Parish will be hosting an Open Day on Saturday, 19th September
2026 from 10:30am – 3pm with an exhibition of photos, memorabilia
and videos over the last 70 years. 
The next day, Sunday 20th September 2026, there will be a church
morning service at 11am celebrating both anniversaries, followed by a
community BBQ. 
Council, through the office of the Provost, may wish to mark these
events with a small token of recognition.
Page 6

Page 7

(d) Motion by Councillor Michelle McGinty – Commonwealth Games
Medal Winner 
This Council congratulates Caitlin Kelly on her outstanding achievement
in winning a bronze medal at the Commonwealth Games.
Council recognises that representing Scotland on the international
stage is a tremendous honour and that becoming the first female boxer
to secure a medal for Team Scotland at a Commonwealth Games is a
testament to Caitlin's dedication, perseverance, and sporting
excellence. 
Council notes the inspiration that Caitlin's success provides to young
people across West Dunbartonshire and beyond, demonstrating the
rewards that can be achieved through hard work, commitment, and
determination. 
Council further acknowledges the support provided throughout Caitlin's
sporting journey by her family, coaches, teammates, and the wider local
community, whose encouragement has helped contribute to this
remarkable accomplishment. 
Request for the Chief Executive or Provost to write to Caitlin Kelly
conveying the Council's congratulations and best wishes for her future
sporting career. 
(e) Motion by Councillor Hazel Sorrell – Congratulations to Singer
Station on Breaking the Mould 
Council notes the outstanding achievement of Singer Station and all
those involved in the production of the musical Breaking the Mould. 
Council recognises the dedication, creativity and hard work
demonstrated by the cast, production team, volunteers and supporters
in bringing this ambitious project to life, showcasing the rich cultural
talent that exists within West Dunbartonshire. 
Council further notes that community-led arts initiatives such as
Breaking the Mould play a vital role in enriching local life, providing
opportunities for people of all ages to participate in the arts, build
confidence, develop skills and strengthen community connections. 
Council acknowledges the positive contribution that Singer Station
continues to make to the local cultural landscape, helping to celebrate
the area's heritage while inspiring future generations of performers and
creatives. 
Page 7

Page 8

Therefore, Council agrees to congratulate everyone involved in Singer
Station and Breaking the Mould on their success, thank them for their
contribution to the cultural life of West Dunbartonshire, and wish them
every success in their future productions and endeavours. 
(f) Motion by Councillor Sophie Traynor – Stepping Stones
Council recognises that Stepping Stones is an invaluable organisation
here in West Dunbartonshire. 
They have built up a network of peer led support that has been
instrumental in helping people improve their mental health and has
been a lifeline in many of our residents’ darkest days. 
In this their 35th anniversary year Council congratulates Stepping
Stones on all they have achieved and wishes them every success in
their essential work. Council asks that a civic reception be organised as
a token of our thanks to this organization.
Page 8

Page 9

WEST DUNBARTONSHIRE COUNCIL 
At a Hybrid Meeting of West Dunbartonshire Council held in the Civic Space, 16
Church Street, Dumbarton on Wednesday, 17 June 2026 at 4.00 p.m. 
Present:   Provost Karen Murray Conaghan, and Councillors Jim Bollan,
Kevin Crawford, Ian Dickson, Diane Docherty, Gurpreet Singh
Johal, Daniel Lennie, David McBride, Michelle McGinty, June
McKay, John Millar, Lawrence O’Neill, Lauren Oxley, Chris
Pollock, Martin Rooney, William Rooney, Gordon Scanlan,
Hazel Sorrell, Clare Steel and Sophie Traynor. 
Attending: Peter Hessett, Chief Executive; Laurence Slavin, Chief Officer –
Resources, and Section 95 Officer; Graeme Forrester, Manager
of Democratic and Registration Services (Legal Officer);
Amanda Graham, Chief Officer – Citizen, Culture and Facilities;
Victoria Rogers, Chief Officer – People and Technology; Peter
Barry, Chief Officer – Housing Services; Gail Macfarlane, Chief
Officer – Roads and Neighbourhood; Gillian Hamilton, Chief
Officer – Education; Beth Culshaw, Chief Officer – West
Dunbartonshire Health and Social Care Partnership (HSCP);
Julie Slavin, Chief Financial Officer; Carol Alderson, Finance
Manager; Michelle Lynn, Asset Manager; Michael Mulgrew,
Planning, Building Standards and Environmental Health
Manager; and Carol-Ann Burns, Senior Democratic Services
Officer. 
Also Attending: Caleb Oguche, External Audit Senior Manager, and Gillian
McConnachie, Shared Chief Internal Auditor, Forvis Mazars. 
Apologies: Apologies for absence were intimated on behalf of Councillors
Fiona Hennebry and Jonathan McColl. 
Provost Karen Murray Conaghan in the Chair 
STATEMENT BY CHAIR – AUDIO STREAMING 
Provost Murray Conaghan advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback. 
ITEM 5
Page 9

Page 10

DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
URGENT ITEMS OF BUSINESS; MOTION BY COUNCILLOR LAUREN OXLEY
– ‘CELEBRATING JOHN MCGINN AND SCOTLAND’S HISTORIC WORLD CUP
VICTORY’ AND MOTION BY COUNCILLOR MICHELLE MCGINTY –
‘CONGRATULATIONS TO RENTON BOXER CAITLIN RAINEY’ 
The Provost advised that she had accepted requests from Councillors Oxley and
McGinty for motions concerning, respectively, John McGinn and Caitlin Rainey.  The
Provost advised that these items would be considered at the end of the meeting. 
RECORDING OF VOTES 
The Council agreed that all votes taken during the meeting would be carried out by
roll call vote to ensure an accurate record. 
OPEN FORUM 
The Council noted that no open forum questions had been submitted by members of
the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of West Dunbartonshire Council held on 29 April 2026 were
submitted and approved as a correct record. 
MINUTES OF MEETING OF AUDIT COMMITTEE 
The Minutes of Meeting of the Audit Committee held on 18 February 2026 were
submitted and noted and all decisions contained therein were approved. 
Page 10

Page 11

DC24/108/PPP: ERECTION OF RESIDENTIAL-LED (CLASS 8, CLASS 9 AND SUI
GENERIS) MIXED USE DEVELOPMENT INCLUDING CLASS 1A (RETAIL),
CLASS 3 (RESTAURANTS AND CAFES), SUI GENERIS HOT FOOD
TAKEAWAYS/PUBLIC HOUSES, CLASS 4 (OFFICE), CLASS 10 (NON
RESIDENTIAL INSTITUTIONS) AND CLASS 11 (LEISURE) WITH ASSOCIATED
OUTDOOR SPACE AND PUBLIC REALM WORKS, ACCESS, LANDSCAPING,
PARKING AND INFRASTRUCTURE AT ARTIZAN CENTRE, COLLEGE WAY,
DUMBARTON BY WEST DUNBARTONSHIRE COUNCIL 
A report was submitted by the Chief Officer – Regulatory and Regeneration seeking
determination of a planning application for a national development, the site of which
sits within the Clyde Mission area as set out in National Planning Framework 4, and
therefore, under the terms of the approved Scheme of Delegation, was required to
be determined by Full Council. 
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation and in answer to Members’
questions, the Council agreed:- 
(1) to approve the application subject to the conditions set out in Section 9 of 
Appendix 1 to the report (shown as Appendix 1 to these Minutes); and 
(2) to note: (i) that by so having determined to approve the application, subject to
conditions, the application would require to be notified to the Scottish
Ministers under The Town and Country Planning (Notification of Applications)
(Scotland) Direction 2009 as SEPA had objected in principle to the
development; (ii)  should West Dunbartonshire Council remain consenting
authority for the application, a notification to Scottish Ministers under the
Town and Country Planning (Notification of Applications) (10 or more homes
on non-allocated land) (Scotland) Direction 2025 would be required. 
FINANCIAL UPDATE 
A report was submitted by the Chief Officer – Resources providing an update on the
financial challenges facing the Council and the estimated 2027/28 to 2031/32
revenue budget gaps. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed to note the
updated position regarding projections for the Council’s estimated revenue budget
gaps in 2027/28-2031/32, particularly the updated estimated mid-range 2027/28
budget gap of £10.005m. 
Page 11

Page 12

2025/26 UNAUDITED WEST DUNBARTONSHIRE COUNCIL AND COMMON
GOOD AND TRUST ANNUAL ACCOUNTS 
A report was submitted by the Chief Officer – Resources providing a copy of the
unaudited 2025/26 West Dunbartonshire Council Annual Accounts and information
regarding the 2025/26 outturn as set out in the draft accounts. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:- 
(1) to note the outcome of the self-evaluation process in considering how the
Council currently meets the agreed Code of Good Governance, together with
the issues identified and improvement actions; 
(2) to approve the actions identified by management in the Annual Governance
Statement to improve internal controls; 
(3) to note the unaudited 2025/26 West Dunbartonshire Council Annual Accounts
which incorporates the Annual Governance Statement; 
(4) to note the unaudited 2025/26 Common Good and Trust Funds Annual
Accounts; and 
(5) to delegate authority to the Audit Committee to formally approve the audited
accounts. 
AUDITED 2024/25 WEST DUNBARTONSHIRE COUNCIL ANNUAL ACCOUNTS 
Members noted that it had not been possible for a report on this matter to be
provided in time for the present meeting and that the report would instead be
submitted to the Meeting of Council being held on 26 August 2026. 
2024/25 WEST DUNBARTONSHIRE COUNCIL ANNUAL AUDIT REPORT 
Members noted that it had not been possible for a report on this matter to be
provided in time for the present meeting and that the report would instead be
submitted to the Meeting of Council being held on 26 August 2026. 
GENERAL SERVICES REVENUE BUDGETARY CONTROL REPORT TO 
31 MARCH 2026 (DRAFT OUTTURN) 
A report was submitted by the Chief Officer – Resources advising on the draft
outturn position of the 2025/26 Revenue Budget and the level of the General Fund
Reserve as at 31 March 2026. 
Having heard the Chief Officer – Resources in further explanation, the Council
agreed:-
Page 12

Page 13

(1) to note the overall favourable variance (underspend) on the General Fund
Revenue Budget of £7.236m, an improvement in forecast of £4.090m since
last reported (£3.146m); 
(2) to note a projected favourable variance (underspend) on the General Services
Delivery Budget of £1.797m (0.60% of total budget), an improvement in
forecast of £2.108m since last reported (£0.311m adverse at period 10); 
(3) to note a projected in-year use of earmarked reserves of £3.027m, offset by a
transfer in of £8.439m to earmarked reserves and a transfer from
unearmarked reserves of £1.173m thus increasing the overall forecast
earmarked balance to £15.406m; and 
(4) to approve the transfer from free reserves of £2.260m to the Early
Severance/Voluntary Early Retirement Reserve and £1.180m to the
Smoothing Fund. 
GENERAL SERVICES CAPITAL BUDGETARY CONTROL REPORT 2025/26 TO
31 MARCH 2026 (DRAFT OUTTURN) 
A report was submitted by the Chief Officer – Resources providing the draft outturn
on the General Services capital financial performance to 31 March 2026. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:- 
(1) to note the draft outturn of the 2025/26 General Services capital budget; 
(2)  to note the recurring budget underspend and 8 completed projects detailed in     
Appendix 2 to the report; and 
(3) to note the reprofiling of the budgets of 50 projects noted in Appendix 3 to the
report (£10.264m) over the project life. 
HOUSING REVENUE ACCOUNT OUTTURN FOR FINANCIAL YEAR 2025/2026 
A report was submitted by the Chief Officer – Resources advising of the Housing
Revenue Account outturn position for 2025/2026. 
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Council agreed:- 
(1) to note the HRA outturn 2025/26 surplus of £0.512m, a projected favourable
variance (underspend) of £0.477m; and 
(2) to note the 31 March 2026 HRA reserve position of £1.122m which was
£0.038m below the HRA prudential target of £1.160m. 
Page 13

Page 14

HOUSING REVENUE ACCOUNT CAPITAL OUTTURN FOR FINANCIAL YEAR
2025/2026 
A report was submitted by the Chief Officer – Resources advising of the Housing
Revenue Account capital outturn position for 2025/2026. 
Having heard the Chief – Resources Officer in further explanation, the Council
agreed to note the outturn position against the 2025/26 HRA capital plan. 
CREMATORIUM 
A report was submitted by the Chief Officer – Roads and Neighbourhood providing
the information requested in the amendment agreed at the Infrastructure,
Regeneration and Economic Development Committee meeting on 20 May 2026 in
relation to weekend access to the Hall of Remembrance at Clydebank Crematorium. 
SUSPENSION OF STANDING ORDERS 
Having heard the Provost and following discussion, the Legal Officer advised that a
suspension of Standing Order 29(c) would be required to be agreed in order that a
proposed motion by Councillor Bollan could be considered.  The Council agreed the
suspension of the Standing Order. 
ADJOURNMENT 
The Provost adjourned the meeting for a short recess. The meeting reconvened at
5.00 p.m. with all those Members and officers listed in the sederunt present.  After
discussion and having heard from the Chief Executive, Councillor McBride moved:- 
That the Council agrees:- 
(1) to note the actions taken by the Service to deliver the saving option
agreed in March 2026; 
(2) to note the costs set out within paragraph 4.6 of the report; and 
(3) to reinstate access to view the Book of Remembrance on Saturdays    
and Sundays with additional costs to be funded from reserves. 
As an amendment, and noting that any potential additional costs would be funded
from reserves, Councillor Bollan moved:- 
Council agrees to reverse the cut made to Crematorium Services on 4.3.2026
contained in Ref 2627 RNO6. 
Page 14

Page 15

The reason for this proposal is that the report presented was incomplete by
not advising Council that the saving of £480 per week was against an income
of around £1,542 per week for a Saturday, resulting in a loss of income to
WDC of around £53,000 a year. 
This is an extremely sensitive issue for the public in West Dunbartonshire and
it is important that the Council correct the situation by re-instating the
cremation services on a Saturday. 
While the additional income of around £53,000 a year for WDC is welcome,
the increased service to bereaved families is hugely more important. 
Councillor Martin Rooney then seconded Councillor McBride’s motion, and
Councillor McKay seconded Councillor Bollan’s amendment. 
On a roll call vote being taken between the amendment (Councillor Bollan) and the
motion (Councillor McBride), 13 Members voted for the amendment, namely Provost
Murray Conaghan and Councillors Bollan, Crawford, Dickson, Docherty, Lennie,
McKay, O’Neill, Oxley, Pollock, Scanlan, Steel and Traynor, and 7 Members voted
for the motion, namely and Councillors Singh Johal, McBride, McGinty, Millar, Martin
Rooney, William Rooney and Sorrell. The amendment was accordingly declared
carried. 
VACANCIES ON COUNCIL COMMITTEES 
A report was submitted by the Chief Officer – Regulatory and Regeneration
requesting the Council fills the current list of vacancies on council committees,
working groups, joint boards and outside bodies. 
After discussion, Councillor Scanlan moved:- 
Council notes the vacant spaces on committees, outside bodies and working
groups.  Council proposes the following elected members to fill the following
vacancies:- 
 Audit Committee – Provost Karen Murray Conaghan. 
 Cultural Committee – Councillor Kevin Crawford. 
 Educational Services Committee – Councillor Chris Pollock. 
 Planning Committee and Local Review Body –- Councillor Sophie
Traynor. 
 West Dunbartonshire Health and Social Care Partnership (Joint Board)
& HSCP Audit and Performance Committee – Councillor Sophie
Traynor. 
Page 15

Page 16

 West of Scotland Archaeology Service Joint Committee - Councillor
Chris Pollock. 
 Visitor Levy Advisory Forum – Councillor Ian Dickson. 
 North Strathclyde Area Support Team (local authority member) -
Councillor Lauren Oxley. 
Councillor Martin Rooney asked Councillor Scanlan if he would be willing to accept
the following addendum to his motion:- 
 Educational Services Committee – Councillor Jonathan McColl. 
 Licensing Committee – Councillor Jonathan McColl. 
 Cost of Living Working Group – Councillor Jonathan McColl. 
 Visitor Levy Advisory Forum – Councillor Martin Rooney and Cllr David
McBride. 
Councillor Scanlan confirmed his acceptance of the addendum, and the Council
agreed the motion with addendum. 
NOTICE OF MOTIONS 
Motion by Councillor William Rooney – 10 Years of Clydebank Men’s Shed 
Clydebank Men’s Shed will celebrate its tenth anniversary with an open day on the
5th of August 2026. 
The Men’s Shed was established in 2016 and is marking ten years of supporting
men in Clydebank and beyond. 
Clydebank Men’s Sheds plays an important role as community hub where men
connect through shared activities, foster solidarity, and form lasting friendships.
Over the last decade, it has been vital to help to tackle isolation and support mental
health and wellbeing. 
Council agrees to recognise and promote the positive impact Clydebank Men's Shed
has had on men’s health and wellbeing over the past ten years, and we recognise
the work of all those involved and wish them continued success over the coming
years. 
The Council agreed the motion. 
Page 16

Page 17

Motion by Councillor Hazel Sorrell – Marking Twenty Years of Haldane Youth
Services 
Haldane Youth Services is a registered charity providing afterschool activities and
youth provision for children and young people aged 4–24 in West Dunbartonshire. 
This year the group will celebrate two decades of dedicated service to children,
young people, families, and the wider community across West Dunbartonshire. 
Haldane Youth Services aim is to make a positive and lasting difference to the lives
of young people and their families by: 
 Raising aspirations and broadening horizons.
 Encouraging confidence and increasing self-esteem.
 Giving young people a voice within their community.
 Rewarding commitment and positive social interaction.
 Supporting young people to make healthy lifestyle choices.
The group also work closely with local primary and secondary schools to ensure our
support is accessible, familiar, and rooted in the community. 
Since opening in 2006, Haldane Youth Service has grown from a small volunteer-led
project into a trusted community organisation delivering high-quality programmes
that promote wellbeing, confidence, leadership, and positive futures. 
The Council notes that Haldane Youth Services is celebrating its 20th Anniversary,
on Saturday 27th June at the Annex Building Old Jamestown Primary, Main Street,
Jamestown. 
Finally, this Council thanks all the staff and the volunteers - past and present - for all
they have done over the past twenty years to help make Haldane Youth Services
such a great success. 
The Council agreed the motion. 
URGENT MOTIONS 
Motion by Councillor Lauren Oxley – Celebrating John McGinn and Scotland's
Historic World Cup Victory 
Council notes with immense pride that Clydebank’s own John McGinn scored the
goal that secured Scotland’s first World Cup victory for the men’s team since 1990 -
a historic moment for our country. 
Page 17

Page 18

McGinn is a proud Bankie who has gone on to build an inspirational career in
football, playing in the Premier League and being called up to play for Scotland’s
National Team on more than 50 occasions. Throughout his success, he continues to
return to his hometown and has been a consistent supporter of local schools,
businesses and organisations.  
His affection for Clydebank and the local people who have supported him throughout
his journey was also highlighted in the recent BBC documentary “In Search of the
Beautiful Game”, hosted by fellow Bankie Kevin Bridges, in which they revisited
some of the places that helped shape them and put the town on the map.
McGinn’s journey from local pitches in Clydebank to representing Scotland on the
world stage is an inspiration to children and young people across West
Dunbartonshire. It demonstrates that with hard work and perseverance, young
people achieve their dreams and aspirations, regardless of where they come from.  
Council congratulates John McGinn and the entire Scotland squad on their historic
win and wishes them the best of luck for the remainder of the tournament.
The Council agreed the motion. 
Motion by Councillor Michelle McGinty – Congratulations to Renton Boxer
Caitlin Rainey 
That this Council congratulates Caitlin Rainey, an outstanding boxer from Renton, on
her selection to represent Team Scotland at the Commonwealth Games in Glasgow
this summer. 
The Council recognises that Caitlin has earned her selection through hard work,
dedication, and exceptional sporting talent, including winning a bronze in the
European Under-23 Championships in 2024.   
Understands that Caitlin is one of eleven boxers, five of them women who will make
their Boxing debut at the games. 
Caitlin's achievement is not only a source of real pride to her family, Renton and
wider West Dunbartonshire but brings real inspiration to young people, especially
young women in our local area. 
The Council wishes Caitlin every success as she prepares to compete in Glasgow
2026 and looks forward to watching her journey in the competition. 
The Council agreed the motion. 
DATE OF NEXT MEETING 
Members are requested to note that the next ordinary meeting of West
Dunbartonshire Council is scheduled to be held on 26 August 2026.
Page 18

Page 19

The meeting closed at 5.52 p.m. 
Page 19

Page 20

APPENDIX 1 
9. CONDITIONS 
1. The development to which this permission relates must be commenced no later
than eight years from the date of this permission. 
Reason: To be in compliance with Section 59(2A) (b) of the Town and Country
Planning (Scotland) Act 1997, as amended. 
2. That prior to the submission of the first application for the approval of matters
specified by condition, a detailed phasing plan for the entire application site
showing the relevant phases and anticipated timescales for the development of
each phase, and the inter-relationship of the phases shall be submitted for the
further approval of the Planning Authority. All applications for the approval of
matters specified by condition shall thereafter either demonstrate compliance with
the agreed phasing plan or include an updated phasing plan for
approval. Development shall at all times proceed in accordance with the most up-
to-date approved phasing plan unless otherwise first agreed in writing by the
Planning Authority. 
Reason: To ensure the appropriate phasing for the comprehensive delivery of
the development of the site. 
3. No development shall commence within any phase of the development until such
time as approval of the detailed design, layout and other matters associated with
that development phase, (hereinafter called "the matters specified in conditions")
has been granted by the Planning Authority. These matters are as follows: 
a. the siting, design, external appearance and external materials of all buildings
and other structures, including floor plans and elevations. Full
specifications of all materials must be submitted and samples submitted to
the Planning Authority on request. the means of access to, and layout
of, the site, including car parking provision inclusive of disabled bays, and the
provision of electric vehicle charging, cycle parking provision and servicing
arrangements in so far as is required. 
b. the details of, and timetable for, the implementation of the hard and soft
landscaping for the site, including details of maintenance arrangements. 
c. full details of the design and location of all boundary walls and fences.
d. details of existing and proposed site levels and site sections.
e. details of flood mitigation measures.
f. the provision of surface water drainage works incorporating Sustainable
Drainage Systems (SuDS). For the avoidance of doubt, the submitted details
shall be in accordance with CIRIA C753, the SUDS Manual and Sewers for
Scotland This shall also demonstrate that all surface water is intercepted
within the site.
g. the disposal of sewerage. 
h. details of the storage and collection of waste and recycling from the
development.
i. detailed information on biodiversity enhancement measures to be
incorporated into the development. 
j. details of tree protection during the construction phase.  
k. full details of the incorporation of low and zero carbon infrastructure into the
development. 
Page 20

Page 21

l. an updated noise impact assessment specifically considering the detail of the
development comprising that phase and any required noise mitigation
measures shall be submitted.
m. an updated air quality assessment specifically considering the detail of the
development comprising that phase and any required air quality mitigation
measures shall be submitted. 
n. a detailed report on the extent, scale and nature of any contamination for
each development parcel/phase shall be carried out with a detailed
remediation strategy and implementation plan detailing the measures
necessary to bring the site to a condition suitable for the intended use.
o. A Green and Active Travel Plan. 
Reason: In order to ensure that the development is of an acceptable appearance
and character and that all associated technical issues are addressed. 
4. That as part of the first application for matters specified by condition as required
in connection with condition 3, a site-wide water environment investigation and
assessment shall be submitted to and approved in writing by the Planning
Authority. The report shall be prepared by a suitably qualified person and as a
minimum shall include the following: 
a. Suitable and sufficient monitoring from across the entire site in order
to identify the extent, scale and nature of contamination with regards to
the water environment.
b. An appropriate level of assessment in accordance with current guidance
that identifies the key receptors and the significance of any pollutant
linkages found to be present. 
Should a significant pollutant linkage be identified on the site then a site wide
preliminary remedial options appraisal is to be provided that demonstrates
whereabouts on the site remediation is considered likely. Any measures
identified in the report shall be implemented as approved within a timescale
agreed with the Planning Authority. 
Reason: To protect the wider environment and to ensure that the site is suitable 
for its intended use. 
5. If there is a requirement to either re-use site won material or to
import material then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and approved
by the Planning Authority prior to any material being re-used or imported. In
addition to this and in accordance with BS3882:2015 and BS8601:2013, material
to be used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours. 
On completion of the works and at a time and or phasing agreed by the Planning
Authority, the developer shall submit a verification report containing details of the
source of the material and appropriate test results to demonstrate its suitability for
use. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
6. The presence of any previously unexpected contamination that becomes evident
during the development of the site shall be reported to the Planning Authority in
Page 21

Page 22

writing within one week, and work on the site shall cease. At this stage, if
requested by the Planning Authority, an appropriate investigation and risk
assessment shall be undertaken and a remediation scheme shall be submitted to
and approved by the Planning Authority prior to the recommencement of site
works. The approved details shall be implemented as approved. 
Reason: To protect public health and to ensure that the site is fit for its intended
use. 
7. That all surface water shall be intercepted within the site both during construction
and on completion of the development. Full details of measures to ensure that
surface water run-off is contained within the site shall be submitted to and
approved in writing by the Planning Authority prior to the commencement of any
works on site. The measures shall be implemented and maintained as approved. 
Reason: In the interest of management of surface water and drainage
infrastructure. 
8. Notwithstanding condition 3 above, no residential property shall be occupied until
the contents of a Travel Information Pack which encourages reduced
dependency on the private car by highlighting the location of local amenities,
public transport services and active travel routes is submitted to and approved in
writing by the Planning Authority. Thereafter, on the occupation of
each residential property, the approved Travel Information Pack shall be provided
to new residents. 
Reason: In the interests of encouraging sustainable travel habits 
9. That unless otherwise first agreed in writing by the Planning Authority as part of
any application for maters specified by condition for any phase of the
development, a Construction Traffic Management Plan shall be submitted which
shall include, but shall not necessarily be limited to the following: 
a. A construction programme
b. details of wheel washing and road cleaning; 
c. hours of operation of site traffic; 
d. construction vehicle routes; 
e. prohibited routes; 
f. hours of deliveries; 
g. access to the site; 
h. construction traffic signage; 
i. parking locations of construction vehicles, site operatives and contractors
which shall include staff parking out with the public road. 
Thereafter, construction traffic shall be managed in accordance with the approved
arrangements at all times unless first otherwise agreed in writing by the Planning
Authority. 
Reason: To ensure all matters relating to construction traffic are managed in an
appropriate manner in the interests of road and pedestrian safety. 
10. That unless otherwise first agreed in writing by the Planning Authority as part of
any application for maters specified by condition for any phase of the
development, a Construction Environmental Management Plan (CEMP) shall be
Page 22

Page 23

submitted to and approved in writing by the Planning Authority. The CEMP shall
include: 
a. A site specific CEMP outlining the details of all construction works and
mitigation to be undertaken in relation to that phase together with an
indicative timetable of activities. 
a. Hours of work associated with that phase for all works and ancillary
operations (including piling) which are audible at the site boundary (or at such
other place(s) as may first be agreed in writing with the Planning Authority)
b. The hours of all delivery and other traffic arriving and leaving the site. 
c. A site waste management plan (dealing with all aspects of waste produced
during the construction period) 
d. Details of the formation of the construction compound, welfare facilities,
materials storage areas and stockpiles, car parking, compound lighting and
boundary fencing
e. A drainage management strategy for the site and a detailed drainage
f. management plan, addressing the management of surface, ground and
wastewater arising during construction. This shall demonstrate that all surface
water is intercepted within the site during the construction period. 
g. Details for the sewage disposal and/or treatment from onsite welfare facilities 
The CEMP for each phase of the development shall thereafter be implemented
on site as approved unless otherwise first agreed in writing by the Planning
Authority. 
Reason: To ensure that construction is undertaken in an appropriate manner and
to protect the amenity of nearby residents during the construction period. 
11. No piling works shall be carried out until a method statement has been submitted
to and approved in writing by the Planning Authority. This statement shall include
an assessment of the impact of the piling on surrounding properties, taking into
account the guidance contained in BS 6472-1: 2008 'Evaluation of Human
Response to Vibration in Buildings'. It shall detail any procedures which are
proposed to minimise the impact of noise and vibration on the occupants of
surrounding properties. This statement shall be prepared by a suitably qualified
person, and the piling works shall thereafter be carried out in accordance with the
approved method statement. 
Reason: To minimise noise and disturbance to neighbouring residents/occupants
during construction. 
12. Unless otherwise approved in writing by the Planning Authority, no development
shall commence on site until such time as a scheme for the control and mitigation
of dust has been submitted to and approved in writing by the Planning Authority.
The scheme shall identify likely sources of dust arising from the development or
its construction and shall identify measures to prevent or limit the occurrence and
impact of such dust. The approved scheme shall thereafter be implemented fully
prior to any of the identified dust generating activities commencing on site and
shall be maintained thereafter, unless otherwise approved by the Planning
Authority. 
Reason: To minimise the occurrence of dust, in the interests of the amenity of the
area. 
Page 23

Page 24

13. That as part of the first application for matters specified by condition as required
in connection with condition 3, full details of the implementation of a programme
of archaeological works in accordance with a written scheme of investigation be
submitted for consideration by the Planning Authority in consultation with
the West of Scotland Archaeology Service. Thereafter the developer shall ensure
that the programme of archaeological works is fully implemented as agreed and
that all recording and recovery of archaeological resources within the
development site is undertaken to the satisfaction of the Planning Authority in
agreement with the West of Scotland Archaeology Service. 
Reason: In the interests of the recording of antiquity. 
14. All recommendations set out in Chapter 5 of the Preliminary Ecological
Appraisal Report dated 21st February 2024 shall be followed to the satisfaction of
the Planning Authority inclusive of the requirement for further survey work as may
be required to inform any future application for approval of matters specified by
condition under condition 3 above. 
Reason: In the interests of the protection of biodiversity. 
15. Prior to the occupation of the first residential property within the site, the
developer shall install the necessary infrastructure to enable the full development
and all associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
Reasons: In the interests of providing effective telecommunications connections. 
Page 24

Page 25

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Resources 
Council: 26 August 2026
___________________________________________________________________ 
Subject: 2024/25 West Dunbartonshire Council Annual Audit Report 
1. Purpose 
1.1 The purpose of this report is to present West Dunbartonshire Council’s (the
Council) 2024/25 Annual Audit Report to Members and Controller of Audit 
prior to approving the 2024/25 Audited Annual Accounts for the Council. 
1.2 The report provides Members with an update on the external audit of the
Council’s Annual Accounts for the year ended 31 March 2025. 
2. Recommendations 
2.1 Members are requested to consider the Annual Audit Report to Members and
Controller of Audit 2024/25 for the Council – Appendix 1 to this report. 
3. Background 
3.1 Forvis Mazars (Mazars) have been appointed as the Council’s external
auditors from financial year 2022/23 for a period of five years. 
3.2 The Council’s unaudited 2024/25 Annual Accounts, including the Group
Accounts, were reported to Council on 18 June 2025 and submitted to the
Accounts Commission on 28 June 2025, in accordance with established
deadlines. 
3.3 As the external auditor of the Council, it is Mazar’s responsibility to undertake
their audit work in accordance with International Standards on Auditing, the
principles contained in the Code of Audit Practice issued by Audit Scotland in
June 2021 and the ethical standards issued by the Auditing Practices Board. 
4. Main Issues 
4.1 The audit of the 2024/25 accounts is substantially complete; however, the
Annual Audit Report identifies that, at the time of preparing the report,
some minor matters remain outstanding. In addition, Mazars have noted
they expect to issue an unqualified opinion on the annual accounts. 
4.2 The findings of the audit are contained within the annual audit report for
which is appended to this report (Appendix 1). 
ITEM 8
Page 25

Page 26

4.3 The report confirms that the audit work performed has not identified any
significant control deficiencies and has identified one material
misstatement which has been corrected. This is detailed on page 7 of the
external auditor’s report (Appendix 1).   
4.4 The report identifies eight recommendations for improvement for the
Council (see Appendix A of the Annual Audit Report). The report also
details the Council’s management responses in relation to these
recommendations and provides an update on the recommendations
identified in the 2022/23 or 2023/24 Annual Audit Report (six of which have
been noted as complete). 
4.5 Any recommendations for improvement set out in the annual audit report are
of reduced value, as we have been unable to incorporate them into the
2025/26 financial year as they were communicated too late and as resources
are tied up responding to audit queries there is limited time to implement
changes. 
4.6 The Audit Opinion is detailed on page 5 of the report which advises that
Mazars expect to issue an unqualified opinion on the Council’s Annual
Accounts and the Charities Annual Accounts. 
4.7 Page 27 of the report makes reference to two uncorrected misstatements: 
 Forvis Mazars has estimated a £4.299m overstatement in housing
stock valuation because the social housing discount was not applied to
the market-value of buy-back properties held on the balance sheet.
The Council has made the decision not to adjust the value, as the
external valuer advised that the EUV-SH methodology is complex and
requires full recalibration of Beacon assumptions, rent differentials and
asset-type inputs, rather than a desktop adjustment based on high-
level indices. As the buy-backs will be reflected in the full valuation of
housing stock as at 31 March 2026 , and given the uncertainty over the
reliability of the audit estimate, this has been left as an unadjusted
audit difference.
 A £1.061m balance sheet adjustment to adjust the carrying value of the
Council’s PPP and Finance Lease liabilities due to updates to the PPP
and DBFM accounting models. 
4.8 Page 107 of the Annual Audit Report makes reference to the potential of
additional fees being charged as a consequence of ‘overruns’. There is a
process by which Mazars need to make representation to Audit Scotland to
justify charging additional fees, after which the Council will be contacted.
Council will be aware that the Chief Executive has formally raised 
dissatisfaction with the Mazars audit in previous years and formally requested
a rebate on previous audit fees which neither party agreed to.  Any claim for
additional fees due to overruns will be initially reviewed by the Chief Officer
Page 26

Page 27

Resources to assess the reasonableness of the claim and ensure the root
cause of any overrun is properly identified and apportioned. 
5. People Implications 
5.1 There are no people implications in relation to this report. 
6. Financial and Procurement Implications 
6.1 There are no financial and procurement implications in relation to this report. 
7. Risk Analysis 
7.1 No risk analysis was required 
8. Equalities Impact Assessment (EIA) 
8.1 No equalities impact was required in relation to the production of this report. 
9. Consultation 
9.1 The views of all Chief Officers have been requested on this report and
feedback incorporated herein. 
10. Strategic Assessment 
10.1 The report is in relation to a statutory function. As such, it does not directly
affect any of the strategic priorities 
Laurence Slavin
Chief Officer – Resources
Date: 13 August 2026 
Person to Contact:   Carol Alderson, Finance Manager
Email: carol.alderson@west-dunbarton.gov.uk  
Appendices: 
Appendix 1 – Proposed 2024/25 Annual Audit Report 
Background Papers:
Draft Annual Accounts 2024/25 to Council – 17 June 2025 
Page 27

Page 28

Annual Audit Report
West Dunbartonshire Council– year ended 31 March 2025
August 2026
APPENDIX 1
Page 28

Page 29

Annual Audit Report Letter
Audit Committee
West Dunbartonshire Council
16 Church Street
[Dumbarton
G82 1QL
12 August 2026
Forvis Mazars
100 Queen Street
Glasgow
G1 3DN
Dear Committee Members and Controller of Audit,
Annual Audit Report – Year ended 31 March 2025
We are pleased to present our Annual Audit Report for West Dunbartonshire Council for the year ended 31 March 2025. The purpose of this report is to summarise our audit findings and
conclusions.
This report has been prepared in accordance with the responsibilities set out within the Audit Scotland’s Code of Audit Practice (“the Code”). This report is intended solely for the Audit
Committee for the purpose of communicating certain matters that, in our professional judgement, are relevant to your oversight of the financial reporting process. Except where required by
law or regulation, it should not be used, quoted or made available to any other parties without our prior written consent.
We appreciate the courtesy and co-operation extended to us by West Dunbartonshire Council throughout our audit. We would be happy to discuss the contents of this report, or any other
matters regarding our audit, with you in more detail.
Yours faithfully
Tom Reid
Forvis Mazars LLP
Forvis Mazars LLP – 100 Queen Street, Glasgow- G1 3DN Tel: 0141 227 2400 – www.forvismazars.com/uk
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is a limited liability partnership registered in England and
Wales with registered number OC308299 and with its registered office at 30 Old Bailey, London, EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered
Accountants in England and Wales. Details about our audit registration can be viewed at www.auditregister.org.uk under reference number C001139861. VAT number: GB 839 8356 73Page 29

Page 30

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
3
Contents
01 Executive summary
02 Status of our audit
03 Audit approach and risk summary
04 Significant findings
05 Significant control deficiencies
06 Summary of misstatements
07 Fraud considerations
08 Wider Scope
09   Best Value
Appendix A: Internal control conclusions
Appendix B: Draft management representation letter
Appendix C: Draft audit report
Appendix D: Confirmation of our independence
Appendix E: Other communications
Appendix F: Wider scope and Best Value ratings
This document is to be regarded as confidential to West Dunbartonshire Council. It has been prepared for the sole use of the Audit Committee as the appropriate sub-committee charged
with governance by the Council. No responsibility is accepted to any other person in respect of the whole or part of its contents. Our written consent must first be obtained before this
document, or any part of it, is disclosed to a third party.
Page 30

Page 31

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 01Executive Summary
Page 31

Page 32

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
5
Executive summary
Scope
We have been engaged to audit the financial statements of West Dunbartonshire Council
for the year ended 31 March 2025 which are prepared in accordance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2024-25.
We have conducted our audit in accordance with International Standards on Auditing (UK)
(‘ISAs’), relevant ethical and professional standards, and the requirements set out in the
Audit Scotland’s Code of Audit Practice 2021. Our responsibilities and powers are derived
from our appointment by the Accounts Commission under the Part VII of the Local
Government (Scotland) Act 1973.
Audit status
Our audit procedures are now substantially complete for the year ended 31 March 2025.
Please refer to the ‘Status of our audit’ section for a list of significant audit matters
outstanding at the date of this report. We will provide an update to the Audit Committee on
completion of those outstanding matters through our final annual audit report.
Areas of focus and audit approach, and significant findings
We made no changes to our initial risk assessment and one change to our planned group
audit approach that was communicated to the Audit Committee in our Annual Audit Plan.
Please see page 14 for details.
Our significant risks and other areas of focus, are set out in the ‘Audit approach and risk
summary’ section, with a summary of our audit approach over those areas. Significant
findings from our audit are set out in the ‘Significant findings’ section.
Significant control deficiencies
We did not identify any significant deficiencies in internal control. The non-significant
control observations that we have identified to date are set out in ‘Appendix A: Internal
control conclusions’.
Audit misstatements
A summary of the adjusted and unadjusted misstatements above our reporting threshold,
we have identified, is set out in the ‘Summary of misstatements’ section. We identified one
material misstatement which was adjusted by management. This related to an increase in
Public Private Partnership and Finance Lease Liabilities resulting from IFRS 16
remeasurement. See page 7 for full details.
Audit opinion
At the time of issuing this report and subject to the satisfactory conclusion of our remaining
audit work, we anticipate issuing an unqualified opinion, without modification, as set out in
Appendix C.
Wider scope
We identified a significant risk in relation to financial sustainability but anticipate having no
significant risks to report in relation to the financial management; vision, leadership and
governance; and use of resources to improve outcomes arrangements that the Council has
in place. Further details have been provided in section ‘Wider scope and Best Value’ of this
report.
Page 32

Page 33

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
6
Executive summary (continued)
Best Value
We anticipate having no risks in arrangements to report in relation to the arrangements that
the Council  has in place to secure economy, efficiency and effectiveness in its use of
resources. Further details have been provided in section ‘Wider scope and Best Value’ of
this report.
Management Commentary and Annual Governance Statement opinion
We anticipate that we will have no matters to report in respect of the Management
Commentary or the Annual Governance Statement preparation as it is consistent with the
financial statements and has been prepared in accordance with statutory guidance issued
under the Local Government in Scotland Act 2003 and Delivering Good Governance in
Local Government Framework 2016. Our proposed Management Commentary and Annual
Governance Statement opinion is included in the draft auditor’s report in Appendix C.
Matters on which we report by exception
We are required by the Accounts Commission for Scotland to report to you if, during the
course of our audit, we have found that adequate accounting records have not been kept;
the financial statements and the audited part of the Remuneration Report are not in
agreement with the accounting records; or we have not received all the information and
explanations we require for our audit. We have nothing to report in respect of these
matters.
Other information
We are required to report on whether the other information (comprising of the
Management Commentary, Annual Governance Statement, Statement of
Responsibilities and the unaudited parts of the Remuneration and Staff Report), is
materially inconsistent with the financial statements; is materially inconsistent with
our knowledge obtained in the course of the audit; or is materially misstated. No
inconsistencies have been identified and we have issued an unmodified opinion in
this respect.
Wider reporting powers
Section 101 of the Local Government (Scotland) Act 1973 requires us to give any person
interested, the opportunity to question us about the accounting records of the Council and
to consider any objection made to the accounts. We confirm that no such correspondence
from electors has been received.
Reporting to the group auditor
The Council is below the threshold for auditor assurance set by the Scottish Government
for all public bodies in Scotland. We are therefore not required to perform any examination
of the Council’s Whole of Government Accounts return. However, we will submit the
required assurance statement to the National Audit Office on conclusion of our audit.
Page 33

Page 34

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
7
Executive summary (continued)
Qualitative aspects of Council’s accounting practices
We have reviewed Council’s accounting policies and disclosures and conclude that they comply with the Code of Practice on Local Authority Accounting in the United Kingdom 2024-25,
appropriately tailored to the Council‘s circumstances.
Draft accounts were received from the Council on 30 June 2025. Officers provided an updated set of accounts on 1 December 2025 reflecting agreed adjustments from the 2023/24 audit,
which was completed on 31 October 2025. The accounts were of reasonable quality; however, we identified several disclosure misstatements through our audit work. See Section 6 for
details. We also found issues with the quality of some of the working papers submitted by officers.
Significant matters discussed with management
During our audit, we communicated the following significant matters to management:
Liabilities From Service Concession Arrangements. The Council has a Public Private Partnership (PPP) contract for the provision of three secondary schools and one primary school,
and a Design-Build-Finance-Maintain (DBFM) contract for one secondary school. The contracts include the build of the schools as well as their maintenance and provision of related
facilities over the period of each contract.
Effective from 1 April 2024, Local Authorities are required to adopt the new International Financial Reporting Standard, IFRS 16. This standard introduces a ‘Right of Use’ asset category
on the Balance Sheet, along with the recognition of corresponding lease liabilities. The Code of Practice on Local Authority Accounting in the United Kingdom 2024/25 requires local
authorities, on adoption of IFRS 16, to reassess and remeasure PPP/PFI liabilities as at 1 April 2024 where the contractual payment profile gives rise to variable lease payments that affect
the measurement of the lease liability.
Management's initial assessment was that no remeasurement was required on transition to IFRS 16, or at subsequent indexation dates, as the contracts incorporate a fixed annual
indexation rate of 2.5%. Management concluded that the lease payments were fixed and therefore did not trigger remeasurement of the PPP lease liability.
As part of our audit procedures, we identified that the annual payments were not fixed but linked to the Retail Price Index. Therefore, the arrangements are subject to the remeasurement
requirements of IFRS 16.
Following this review, officers reassessed the accounting treatment and undertook a remeasurement of the PPP liabilities for both contracts as at 1 April 2024. This resulted in
management adjusting lease liabilities and related balances within the financial statements. These had the effect of increasing PPP and Finance Lease Liabilities by £22.0m. The impact of
these adjustments is detailed in Section 6 of this report.
Page 34

Page 35

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
8
Executive summary (continued)
Significant difficulties during the audit
We draw the following matters to your attention and, where appropriate, explain how these matters were overcome.
We found issues with the quality of some of the working papers submitted by officers. These included those supporting the leases and exit packages transactions, balances and
disclosures, and the consolidation schedules supporting the group accounts. Officers subsequently provided updated working papers which supported the information we were auditing.
There were several areas where officers did not provide us with requested working papers and supporting information until later in the audit. These included:
• Invoices and bank statements for income and expenditure samples.
• Supporting documentation for debtors and creditors samples.
• Supporting documentation for assets under construction.
• Confirmation of the status of legal matters.
We acknowledge the complexity involved in tracing bank statement information for our sampled items. We will continue to work with officers to ensure our requests are clearly
communicated.
Other matters of significance
We encountered no other significant difficulties during our audit and had no significant disagreements with management. There was effective co-operation and communication between
Forvis Mazars, management, and the Audit Committee during our audit. All requested information and explanations have been provided to us.
Other matters we are required by ISA (UK) 260 Communication with Those Charged with Governance to communicate to you have been set out in Appendix E.
Page 35

Page 36

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 02Status of our audit
Page 36

Page 37

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
10
Status of our audit
Our audit work is substantially complete and there are currently no matters of which we are aware that would require modification of our audit opinion, subject to the satisfactory
resolution of the outstanding matters set out below.
Status
High - Likely to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Medium - Potential to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Low - Not considered likely to result in a
material adjustment or a change to
disclosures in the financial statements.
N/A - Work on Wider Scope and Best Value
arrangements therefore no risk of
adjustment to the financial statements.
Audit quality control and completion procedures:
Our audit work is undergoing the final stages of review. In addition, there are residual procedures to complete,
including updating post balance sheet event considerations to the point of issuing the opinion, obtaining final
management representations and agreeing adjustments to the final set of accounts.
Low
Annual Report and Accounts and letter of representation:
We will complete our final review of the annual report and accounts upon receipt of the signed version of the
accounts and letter of representation.
Low
Page 37

Page 38

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 03Audit approach and risk summary
Page 38

Page 39

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
12
Audit approach and risk summary
Changes to our audit approach
Except for the change to our Group audit approach detailed on page 13, there are no
other changes to the audit approach we communicated in our Annual Audit Plan, issued
on 10 December 2025.
Materiality
Our provisional materiality at the planning stage of our audit was set at £11.468m for the
Council and £11.588m for the Group using a benchmark of 2% of Gross Expenditure at
Surplus/deficit on Provision of Services level as per the Annual Audit Plan. Our
provisional performance materiality was set at £7.454m for the Council and £8.112m for
the Group. Provisional clearly trivial threshold was £0.344m for the Council and £0.348m
for the Group.
In determining the overall materiality levels, we made the following significant judgements;
• that the main users of the financial statements are the Scottish Government, other
Local Authorities, Regulators, Elected Members, Local Communities, and other
Stakeholders;
• that the primary aggregate that users tend to focus on is gross revenue expenditure at
surplus/deficit level, as it reflects the extent of services delivered by the Council;
• that users of the financial statements and decision makers (the Council, Audit
Committee and Scottish Government) have an understanding of the inherent
uncertainties around accounting estimates and judgements;
• that setting 2% of the chosen benchmark is consistent with the prior period and, as part
of our audit, we have gained an understanding that the Council has a well established
and experienced finance team capable of applying the relevant accounting standards;
and
• that Audit Committee members demonstrate an ability to scrutinise financial
information at a high level.
In determining the performance materiality levels, we made the following significant
judgements;
• that we are now in the third year of our audit appointment and therefore have a more
mature and detailed understanding of the Council’s operations, risks, and financial
environment;
• that the financial reporting process involves significant journal adjustments, which
increases the risk of misstatement;
• that the Council has a strong control environment, which reduces the likelihood of
pervasive misstatements;
• that the Council’s transactions are neither few nor straightforward;
• that errors identified in previous audits were not recurring in nature;
• that we have not identified significant errors in prior periods; and
• management has demonstrated a willingness to promptly identify, disclose, and correct
errors.
Based on the final financial statement figures, and other qualitative factors listed above,
the final overall materiality we applied was £11.806m for the Council and £11.924m for
the Group, final performance materiality: £7.674m for the Council and £8.347m for the
Group; final clearly trivial threshold: £354k for the Council and £358k for the Group.
We maintained a specific materiality of £1k for senior councillors and senior employees'
remuneration and pension benefits, £5k (one banding) for other employees' remuneration,
and £50k for exit packages disclosed in the Remuneration Report.
Page 39

Page 40

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
13
Group audit approach
As set out on the following page, we have made changes to the group audit approach we communicated in our Annual Audit Plan, issued on 10 December 2025.
Draft accounts were received from the Council on 1 December 2025.
Use of experts
We used the work of management experts to assist us to obtain sufficient appropriate audit evidence on specific items of the financial statements as detailed below
Audit approach and risk summary (continued)
We have provided our consideration of our independence as part of the Council engagement in Appendix C.
Itemof account Management’sexpert Our expert
Valuation of Property,Plant and Equipment Newmark GeraldEve LLP We did not engage an internal expert but took into consideration relevant
information available from third parties.
Net Defined Benefit Liability/Surplus Hymans Robertson
Weidentified PwC as an auditor’s expert.PwC assisted in providing
assurance over pension calculations and assumptions.
Wealso identified EY, auditors of theFund Administrator(Strathclyde Pension
Fund), as another auditor.Werequested and obtained assurances under
Audit Scotland’s protocol.
Remeasurement assessment of Liabilities
From Service Concession Arrangements
MUFG Pension & Market Services We did not engage an internal expert but took into consideration relevant
information available from third parties.
Financial InstrumentsFair value
Calculations and Disclosures
MUFG Pension & Market Services We did not engage an internal expert but took into consideration relevant
information available from third parties.
Page 40

Page 41

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
14
Audit approach and risk summary (continued)
Changes to our audit approach
Set out below are the changes we made to our audit approach since we issued our Annual Audit Plan on 10 December 2025.
Area Audit approach per the Annual Audit
Plan Updated audit approach Reasons for the change in approach
West Dunbartonshire
Integration Joint Board
(IJB) – joint venture /
group component
In our Annual Audit Plan, we identified
the IJB as a material component of the
Group. Accordingly, the IJB was
scoped in for review as part of our
group audit approach.
We reassessed the component’s materiality
during the audit, and after taking account of
consolidation adjustments and the net
impact on the group financial statements, we
concluded that the IJB is not material to the
group. As a result, the component was
removed from scope for detailed audit
review.
The revised assessment reflects further work we carried out
to understand the group structure and consolidation
process. The IJB is significant on a gross basis, however
consolidation adjustments materially reduce its impact on
the group’s financial position and performance. On this
basis, the component no longer meets the threshold for
group materiality, and we considered excluding it from
detailed review to be appropriate and consistent with
auditing standards and professional judgement.
Page 41

Page 42

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
15
Audit approach and risk summary (continued)
Significant risks
Fraud risk
Judgement
Error
Substantive audit
procedures
Tests of controls
Misstatement
identified
Control
recommendations
Conclusion
Page ref to finding
Management override of controls (applies to
Council and Group) Yes No No Yes No No Yes Risk satisfactorily addressed 18
Valuation of property, plant and equipment
(applies to the Council only) No Yes Yes Yes No Yes Yes Risk satisfactorily addressed 19
Valuation of the net defined benefit (liability)/
surplus (applies to the Council only) No Yes Yes Yes No Yes Yes Risk satisfactorily addressed 20
Application of the new accounting standard for
leases – IFRS 16 (applies to the Council only) No Yes Yes Yes No No Yes Risk satisfactorily addressed 21
Liabilities From Service Concession Arrangements
(applies to the Council only) No Yes Yes Yes No Yes No Risk satisfactorily addressed 22
Page 42

Page 43

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
16
Audit approach and risk summary (continued)
Overview of our group audit approach
The Accounts Commission engaged us to audit the group financial statements of West Dunbartonshire Council. Based on our risk assessment and the financial information for the year
ending 31 March 2025, we determined that certain components consolidated into the group financial statements should be subject to either a full scope audit or a specific scope audit, as
set out in the table below.
In addition, to address risks of material misstatement in the group financial statements across components, we also determined that certain components that are not individually material to
the group and which do not, at a component-level, possess risks of material misstatement of the group financial statements on an individual component basis, should be subject to audit
procedures, as set out in the table below along with the scope of the audit procedures performed.
Component name % (of net operating
activity) Location Auditor Scope Changes to scope since
planning?
West Dunbartonshire Council 98 Dumbarton, Scotland Forvis Mazars LLP A full audit of the component’s
financial information No
West Dunbartonshire Integration Joint Board - Dumbarton, Scotland Forvis Mazars LLP Not in scope Yes. See page 13
Dunbartonshire and Argyll and Bute
Valuation Joint Board - Dumbarton, Scotland Forvis Mazars LLP Not in scope No
West Dunbartonshire Leisure Trust 2 Dumbarton, Scotland Wbg (Audit Limited) Not in scope No
Clydebank Property Company - Clydebank, Scotland Azets Not in scope No
West Dunbartonshire Energy Limited
Liability Partnership - Clydebank, Scotland Azets Not in scope No
Dumbarton Common Good - Dumbarton, Scotland Forvis Mazars LLP Not in scope No
West Dunbartonshire Council Charitable
Trusts 2 Dumbarton, Scotland Forvis Mazars LLP Not in scope No
Audit scope definitions
Full scope audit: an audit of the component’s financial information prepared for group reporting purposes using component performance materiality.
Audit of account balance(s), class(es) of transaction, and/ or disclosures(s): an audit of specific account balance(s), class(es) of transaction, and/ or disclosure(s) included in the
component’s financial information prepared for group reporting purposes, using component performance materiality.
Page 43

Page 44

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 04Significant findings
Page 44

Page 45

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
18
Significant findings
The significant findings from our audit include our conclusions regarding the significant risks we identified and other key areas of judgement, which are set out in this section.
Significant risks
Management override of
controls (applies to Council
and Group)
Description of the risk
This is a mandatory significant risk on all audits due to the unpredictable way in which such an override could occur.
Management at various levels within an organisation are in a unique position to perpetrate fraud because of their ability to manipulate accounting
records and prepare fraudulent financial statements by overriding controls that otherwise appear to be operating effectively. Due to the
unpredictable way in which such override could occur there is a risk of material misstatement due to fraud on all audits. You should assess this
risk as part of your oversight of the financial reporting process
blank How we addressed this risk
We addressed this risk through performing audit work over:
• accounting estimates: by evaluating the methods and assumptions used by management to develop the estimate;
• journal entries: testing journals that meet our fraud risk criteria and other adjustments made in preparing the financial statements; and
• significant transactions: considering and testing any significant transactions outside the normal course of business or otherwise unusual.
For the group, we reviewed the consolidation adjustments made by officers in preparing the group financial statements. 
blank Audit conclusion
We identified 4,247 manually posted journals and 208,413 automated journals that met our fraud risk criteria. After investigation, we found no
evidence that these were fraudulent. We did, however, find 14 manual journals and 200,000 automated journals posted without a description.
Through discussions with officers and analysis of the ledger we were able to determine what these journals related to and that they were
appropriate. See page 86 for full details and our recommendation to management.
Our work has provided the assurance we sought in response to the risk of management override of controls and there are no other issues to bring
to your attention.
Page 45

Page 46

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
19
Significant findings (continued)
Significant risks (continued)
Valuation of property,
plant and equipment
(applies to the Council
only)
Description of the risk
The Council held land and buildings (including council dwellings) with a net book value of £1.03 billion at 31 March 2025. The Council has adopted a rolling
revaluation model with other land and buildings revalued over a five-year cycle. This may result in individual assets not being revalued for several years.
This increases the risk of misstatement for those assets that have not been revalued in recent years.
Valuations are based on specialist and management assumptions, with a high degree of estimation. We have determined there is a significant risk of
material misstatement from assumptions that are incorrect and/or not supported by relevant evidence being applied.
blank How we addressed this risk
We addressed this risk by:
• assessing the scope and terms of engagement with the Valuer;
• assessing the competence, skills and objectivity of the Valuer;
• assessing how management use the Valuer’s report to value land and buildings included in the financial statements;
• testing the accuracy of the data used in valuations;
• challenging the Council and Valuer’s assumptions and judgements applied in the valuations;
• reviewing the valuation methodology used, including the appropriateness of the valuation basis;
• considering the reasonableness of the valuation by comparing the valuation output with market intelligence;
• testing a sample of revaluations in the year, by agreeing the revaluations recorded in the Annual Accounts to the Valuer’s reports. As part of this testing, 
we checked whether the movements have been accounted for in accordance with the Code;
• challenging management’s assessment for those assets not subject to valuation in the year;
• checking market movements to assess the materiality of potential movement for 2024/25 for those valued on Existing Use Value on a market comparable
basis; and
• for those valued on a Depreciated Replacement Cost basis, which would be impacted by changes in build costs during the year, we tested
management’s analysis of changes in the Build Costs Information Service (BCIS) index and assess any decisions management make in this regard.
blank Audit conclusion
We identified one immaterial unadjusted misstatement for the valuation of housing stock acquisitions (see page 27). We have also raised two control
deficiencies relating to review of council dwellings enhancement expenditure and assets with nil net book value, and one ongoing prior year control
recommendation on the completeness of the fixed asset register. See Appendix A for full details.
Our work has provided the assurance we sought in response to the risk associated with valuation of property, plant and equipment and there are no other
issues to bring to your attention.
Page 46

Page 47

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
20
Significant findings (continued)
Significant risks (continued)
Valuation of the net defined
benefit (liability)/ surplus
(applies to the Council
only)
Description of the risk
The Council’s net defined benefit liability was £37 million as at 31 March 2024. Estimation of the net pension asset or liability depends on several
complex judgements which are sensitive to changes. These include the discount rate used, the rate at which salaries are predicted to increase, inflation
rates and life expectancy. Due to the high degree of estimation uncertainty associated with the valuations, we have determined there is a significant risk
in this area.
blank How we addressed this risk
We addressed this risk by:
• challenging the reasonableness of the Actuary’s assumptions that underpin the relevant entries made in the financial statements;
• critically assessing the competency, objectivity and independence of the Actuary;
• liaising with the auditors of the Pension Fund Administrator to gain assurance that the overall procedures and controls in place at the Pension Fund
are operating effectively;
• comparing assumptions to expected ranges;
• reviewing the accuracy and completeness of the membership data used by the actuary in preparation of the Actuary’s valuation report;
• independently obtaining confirmation of pension contributions, benefits paid and any material transfers from the Pension Fund Administrator and
comparing with the data used by the Actuary in the actuarial valuation; and
• agreeing data in the Actuary’s valuation report for accounting purposes to the relevant accounting entries and disclosures in the Council’s financial
statements.
blank Audit conclusion
We identified one uncorrected disclosure misstatement due to the external auditor of Strathclyde Pension Fund reporting an unadjusted error in the
Fund’s 2024/25 annual accounts from understatement of private equity, debt and infrastructure and direct portfolio assets (see page 32). We have also
made one control recommendation for management to implement a formal process to evidence review of actuarial reports (see page 82).
Our work has provided the assurance we sought in response to the risk associated with valuation of the net defined benefit liability and there are no
other issues to bring to your attention.
Page 47

Page 48

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
21
Significant findings (continued)
Significant risks (continued)
Application of the new
accounting standard for
leases – IFRS 16 (applies to
the Council only)
Description of the risk
Effective from 1 April 2024, Local Authorities are required to adopt the new International Financial Reporting Standard, IFRS 16. This standard
introduces a ‘Right of Use’ asset category on the Balance Sheet, along with the recognition of corresponding lease liabilities. It applies to all types of
leases, including property, land, vehicles, plant, and equipment where the Council is the Lessee.
IFRS 16 significantly changes how operating leases are accounted for by requiring, for lessees, the recognition of both assets and liabilities for rights
and obligations previously classified under operating leases. Given the complexity of this accounting standard, there is a risk that the Council may not
have a complete and accurate record of the leases it holds. There is also a risk that the right-of-use asset and lease liability may not have been
correctly calculated on the leases the Council has applied the standard to.
blank How we addressed this risk
We addressed this risk by:
• evaluating the design and implementation of controls that the Council has in place over the adoption of the new standard;
• reviewing procurement and contract registers for potential lease arrangements, including embedded leases;
• performing inquiries with management about lease identification processes;
• substantively testing the calculations of lease liabilities and right-of-use assets, where material, to ensure these have been appropriately calculated
in accordance with the new accounting standard;
• reviewing peppercorn and other leases requiring special consideration;
• comparing assumptions to expected ranges;
• reviewing the disclosures made in the financial statements to ensure they are adequate, sufficient, and in line with the Code.
blank Audit conclusion
We found a deficiency with management’s approach to measure right-of-use assets and lease liabilities as at 1 April 2024. This resulted in trivial
differences between management’s calculations and our independent recomputation. See page 82 for full details and our recommendation to
management.
Our work has provided the assurance we sought in response to the risk associated with application of IFRS 16 for leases and there are no other issues
to bring to your attention.
Page 48

Page 49

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
22
Significant findings (continued)
Significant risks (continued)
Liabilities From Service
Concession Arrangements
(applies to the Council
only)
Description of the risk
The Council has a Public Private Partnership (PPP) contract for the provision of three secondary schools and one primary school, and a Design-Build-
Finance-Maintain (DBFM) contract for one secondary school. The contracts include the build of the schools as well as their maintenance and provision
of related facilities over the period of each contract.
The assets used to provide services at the schools are recognised on the Council’s Balance Sheet as operational assets and as a finance lease
liability. The Council has recognised an asset of £136 million and a liability of £86.4million for PPP and DBFM in its 2023/24 annual accounts.
The Code, in implementing IFRS 16, requires local authorities to remeasure their PPP liabilities as at 1 April 2024. The method of accounting for
service concession arrangements can be complex and involves management judgement. There is a risk of material misstatement if the Council does
not appropriately account for its service concession arrangements.
blank How we addressed this risk
We addressed this risk by:
• updating our understanding of the service concession arrangements at the Council;
• reviewing the inputs to current financial models to ensure they have been appropriately updated and for any substantial changes;
• testing material inputs into the model and agreeing outputs to the financial statements;
• reviewing the PPP models for remeasurement calculations or management rationale for not remeasuring the liability in line with IFRS 16; and
• reviewing accounting policies and other related disclosures in the financial statements to ensure they are in line with the Code.
blank Audit conclusion
Management's initial assessment was that no remeasurement was required on transition to IFRS 16, or at subsequent indexation dates, as the
contracts incorporate a fixed annual indexation rate of 2.5%. Management concluded that the lease payments were fixed and therefore did not trigger
remeasurement of the PPP lease liability. We identified that the annual payments were not fixed but linked to the Retail Price Index. Therefore, the
arrangements are subject to the remeasurement requirements of IFRS 16. Following this review, officers reassessed the accounting treatment and
undertook a remeasurement of the PPP liabilities for both contracts as at 1 April 2024. This resulted in management adjusting the lease liabilities and
related balances within the financial statements. This had the effect of increasing PPP and Finance Lease Liabilities by £22.0m (see page 28). We also
identified an immaterial prior period unadjusted misstatement resulting from updates to the PPP and DBFM accounting models (see page 27).
Our work has provided the assurance we sought in response to the risk associated with liabilities from service concession arrangements and there are
no other issues to bring to your attention.
Page 49

Page 50

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
23
Significant findings (continued)
Wider responsibilities – statutory reporting
The 1973 Act allows any persons interested to inspect the accounts to be audited and the underlying accounting records of the Council. The act also allows any persons interested to
object to the accounts. No such objections have been raised.
We are required to notify the Controller of Audit when circumstances indicate that a statutory report may be required.
• Section 102(1) of the 1973 Act allows us to prepare a report to the Commission about the Council’s accounts; matters that have arisen during the audit that should be brought to the
attention of the public; or the performance of the Council in their duties relating to Best Value and community planning. The Controller of Audit plans to make a report on Best Value to
the Commission under Section 102(1) of the 1973 Act in September 2026. This will be based on evidence collected in the 2022/23, 2023/24, and 2024/25 annual audits of the Council.
• Section 102(3) of the 1973 Act allows us to make a special report to the Commission if an item of account is contrary to law; there has been a failure on someone’s part to bring into
account a sum which ought to have been brought into account; a loss has been incurred or deficiency caused by the negligence or misconduct of a person, or by the failure of a body to
carry out a duty imposed on them by any enactment; or a sum which ought to have been credited or debited to one account of a body has been credited or debited to another account
and the body has not taken, or is not taking, steps to remedy the matter. No such reports have been prepared.
• Section 97A of the 1973 Act allows us to undertake or promote comparative and other studies to make and publish recommendations for the securing by local government bodies of
Best Value, improving economy, efficiency and effectiveness in the provision of services by local government bodies and improving the financial or other management of local
government bodies. No such recommendations have been prepared.
Page 50

Page 51

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 05Significant control deficiencies
Page 51

Page 52

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
25
Significant control deficiencies
As part of our audit, we obtained an understanding of the Council’s internal control environment and control activities relevant to the preparation of the financial statements, which was
sufficient to plan our audit and determine the nature, timing, and extent of our audit procedures. Although our audit was not designed to express an opinion on the effectiveness of the
Council’s internal controls, we are required to communicate to the Audit Committee any significant deficiencies in internal controls that we identified in during our audit.
Deficiencies in internal control
A deficiency in internal control exists if:
• A control is designed, implemented, or operated in such a way that it is unable to
prevent, detect, and/ or correct potential misstatements in the financial statements; or
• A control that is necessary to prevent, detect, and/ or correct misstatements in the
financial statements on a timely basis is missing.
The purpose of our audit was to express an opinion on the financial statements. As part of
our audit, we have considered the Council’s internal controls relevant to the preparation of
the financial statements to design audit procedures to allow us to express an opinion on the
financial statements, but not for the purpose of expressing an opinion on the effectiveness of
the Council’s internal controls or to identify any significant deficiencies in their design or
operation.
The matters reported in this section of our report are limited to those deficiencies and other
control recommendations that we have identified during our normal audit procedures and
which we consider to be of sufficient importance to merit being reported.
If we had performed more extensive procedures on internal control, we might have identified
more deficiencies to report or concluded that some of the reported deficiencies need not in
fact have been reported.
Our comments in this section should not be regarded as a comprehensive record of all
deficiencies that may exist or improvements that could be made.
Significant deficiencies in internal control
A significant deficiency in internal control is one which, in our professional judgement, has
the potential for financial loss, damage to reputation, or a loss of information which may
have implications on the achievement of business strategic objectives. Our view is that
observations categorised as a significant deficiency is of sufficient importance to merit the
attention of the Audit Committee.
We have not identified any significant deficiencies in the Council’s internal controls as at the
date of this report.
Other observations
We also record our observations on the Council’s internal controls where, in our
professional judgement, there is a need to strengthen internal control or enhance business
efficiency that do not constitute significant deficiencies in internal control but which we view
as being important for consideration by management.
The other control deficiencies that we have identified as at the date of this report are set out
in ‘Appendix A: Internal control conclusions’.
Page 52

Page 53

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 06Summary of misstatements
Page 53

Page 54

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
27
Summary of misstatements
Unadjusted misstatements
Our overall materiality, performance materiality, and clearly trivial (reporting) threshold were reported in our Annual Audit Plan, issued on 10 December 2025. The final overall materiality
we applied was £11.806m for the Council and £11.924m for the Group, final performance materiality: £7.674m for the Council and £8.347m for the Group; final clearly trivial threshold:
£354k for the Council and £358k for the Group. We maintained a specific materiality of £1k for senior councillors and senior employees' remuneration and pension benefits, £5k (one
banding) for other employees' remuneration, and £50k for exit packages disclosed in the Remuneration Report.
Management has assessed the misstatements in the table below as not being material, individually or in aggregate, to the financial statements and does not plan to adjust. We only report
to the Audit Committee unadjusted misstatements that are either material by nature or which exceed our reporting threshold.
Details of unadjusted misstatement (Current period) Entity Nature CIES CIES Balance Sheet Balance Sheet
Blank Counci
l Blank Blank Dr (£ ‘000) Cr (£ ‘000) Dr (£ ‘000) Cr (£ ‘000)
Dr: Cost of services expenditure
Cr: Property, Plant and Equipment (Council Dwellings)
The Council recognised new housing stock acquisitions in the period since the
last full housing stock valuation at market value. Council dwellings should be
valued at EUV-SH. We have used the most recent social housing discount
factor used by the external valuer of 40.9% to calculate this adjustment.
Council Judgemental
4,299
4,299
Details of unadjusted misstatement (Prior period)
Dr: PPP and Finance Lease Liabilities
Cr: General Fund Balance
To adjust 31 March 2024 carrying values of the PPP and Finance Lease
Liabilities due to updates to the PPP and DBFM accounting models.
Council Factual
1,061
1,061
Aggregate effect of unadjusted misstatements blank blank 4,299 1,061 5,360
We will obtain written representations confirming that, after considering the unadjusted misstatements, both individually and in aggregate, in the context of the financial statements taken
as a whole, no adjustments are required.
Page 54

Page 55

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
28
Summary of misstatements
Adjusted misstatements
The misstatements in the table below have been adjusted by management. We report all individual misstatements above our reporting threshold that we identify during our audit
and which management had adjusted and any other misstatements we believe the Audit Committee should be made aware of.
Details of adjustment Entity Nature CIES CIES Balance Sheet Balance Sheet
Blank Dr (£ ‘000) Cr (£ ‘000) Dr (£ ‘000) Cr (£ ‘000)
Dr: Property. Plant and Equipment (Other Land and Buildings)
Cr: PPP and Finance Lease Liabilities
Recognition of the increase in PPP and Finance Lease Liabilities
resulting from IFRS 16 remeasurement. See page 7 for full details.
Council Factual
21,984
21,984
Dr: Services Expenditure (Education, Learning and Attainment )
Cr: Property. Plant and Equipment (Other Land and Buildings)
Impairment charge recognised against the increase in asset
carrying amounts generated by the IFRS 16 remeasurement.
Council Factual
21,984
21,984
Dr: Capital Adjustment Account
Cr: General Fund Balance
Statutory reversal of impairment loss recognised following IFRS 16
remeasurement, transferred from the General Fund to the Capital
Adjustment Account.
Council Factual
21,984
21,984
Aggregate effect of unadjusted misstatements blank blank 21,984 43,968 65,952
Page 55

Page 56

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
29
Summary of misstatements (continued)
Disclosure misstatements
We identified the following disclosure misstatements during our audit that have been corrected by management:
Details of disclosure adjustments
Management commentary
• Corrections to headline financial figures (e.g. funding, net expenditure, reserves) to ensure consistency with the audited financial statements.
• Alignment of Housing Revenue Account and Balance Sheet disclosures to underlying notes and primary statements.
• Removal of outdated or inaccurate narrative.
• Improvements to internal consistency across tables and narrative explanations.
• Inclusion of additional information explaining unmet targets in the financial performance Indicators.
Annual governance statement
• Update to the commencement period of the new approach to auditing Best Value.
Remuneration Report
•   Corrections to member roles, titles and committee responsibilities, ensuring disclosures reflect actual governance arrangements.
• Updates to pension disclosures and contribution rates to ensure accuracy and clarity.
• Amendments to exit package disclosures and bandings to align with underlying payroll records and working papers.
• Minor narrative and cross reference corrections to improve consistency and accuracy.
Property, Plant and Equipment and Leases (IFRS 16)
• Updates to ensure proper presentation of Right of Use assets in accordance with the Code.
• Correction to capital financing, commitments and lease disclosures.
• Alignment of operating lease disclosures with transition to IFRS 16.
Useable and Unusable Reserves
• Inclusion of missing summary disclosure for unusable reserves balances.
• Correction of technical reserve movements, including revaluation reserve entries and pension-related adjustments.
• Update to remaining amortisation period disclosures to reflect current estimates.
Page 56

Page 57

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
30
Summary of misstatements (continued)
Disclosure misstatements (continued)
Details of disclosure adjustments
Housing Revenue Account
• Correction of classification and mapping issues within the HRA statement (no impact on net position).
• Minor correction to average rent calculation due to formula error.
• Inclusion of additional information explaining unmet targets in the financial performance indicators.
Council Tax and Non Domestic Rates (NDR) Income
• Correction of prior year comparative figures in Council Tax base disclosures.
• Amendment of prior year NDR figures to align with signed accounts.
• Removal of outdated or inaccurate narrative.
• Improvements to internal consistency across tables and narrative explanations.
• Inclusion of additional information explaining unmet targets in the financial performance indicators.
Related Parties And Other Notes
• Adjustments to related party balances to agree with final audited entity accounts.
• Updates to financial instruments, debtors and termination benefits disclosures to reflect accurate balances.
Corrections to classification and presentation issues across notes.
Pensions
• Correction of contribution rates and disclosures.
• Updates to IAS 19 disclosures and descriptions for consistency with underlying calculations.
• Refinement of narrative explanations to improve technical accuracy.
Page 57

Page 58

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
31
Summary of misstatements (continued)
Details of disclosure adjustments
Accounting Policies
• Enhancements to improve completeness and transparency, including:    
- Accruals threshold disclosures
- IFRS 16/Right of Use asset accounting
- Cash and cash equivalents policy.
• Updates to improve completeness and transparency around accruals threshold disclosures, IFRS 16/Right of Use asset accounting and cash and cash equivalents policy
• Corrections to ensure compliance with the Code, including  infrastructure asset relief period and removal of duplicated or outdated text.
• Updates to reflect actual accounting practices applied.
Group Accounts
• Multiple adjustments to ensure alignment with audited subsidiary accounts (WDLT, CPC, Energy LLP, VJB). Including corrections to:
- intercompany balances
- net assets values and movements
- cash flow statement classification and amounts.
• Updates to narrative to reflect actual financial performance (e.g. loss vs surplus).
• Improvements to accuracy and internal consistency across group disclosures.
There were other adjustments for minor consistency and presentational matters.
Disclosure misstatements (continued)
Page 58

Page 59

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
32
Summary of misstatements (continued)
Uncorrected disclosure misstatements
We identified the following disclosure misstatements during our audit that have not been corrected by management:
Note 22 Defined Benefit Pension Scheme
The external auditor of Strathclyde Pension Fund reported an unadjusted error in the Fund’s 2024/25 annual accounts due to understatement of private equity, debt and infrastructure and
direct portfolio assets. We have apportioned this error to the Council based on its share of the Fund’s assets. This results in the fair value of plan assets being understated by £2,479k in
the Council’s accounts. This adjustment would have no overall impact on the Comprehensive Income and Expenditure Statement or Balance Sheet due to application of the asset ceiling
accounting adjustment which limits the Council’s ability to recognise a pension asset.
We will obtain written representations confirming that, after considering the unadjusted disclosure misstatements, both individually and in aggregate, in the context of the annual report
and financial statements taken as a whole, no adjustments are required.
Page 59

Page 60

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 07Fraud considerations
Page 60

Page 61

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
34
Fraud considerations
We have a responsibility to plan and perform our audit to obtain reasonable assurance
that the financial statements are free from material misstatement, whether due to fraud or
error.
Your responsibilities
Management has primary responsibility for the prevention and detection of fraud. It is
important that management, with your oversight, place a strong emphasis on fraud
prevention, which may reduce opportunities for fraud to take place, and fraud deterrence,
which could persuade individuals not to commit fraud because of the likelihood of
detection and punishment. This involves a commitment to creating a culture of honesty
and ethical behaviour which is reinforced by your active oversight.
Our responsibilities
We have a responsibility for obtaining reasonable assurance that the financial statements
taken as a whole are free from material misstatement, whether due to fraud or error. The
distinguishing factor between fraud and error is whether the underlying action that results
in a misstatement is intentional or unintentional. Two types of intentional misstatements
are relevant to us – misstatements resulting from fraudulent financial reporting, and
misstatements resulting from the misappropriation of assets.
ISA presumed fraud risks
As set out in the ‘Audit approach and risk summary’ section, the risk of fraud in
management override of controls was identified as a significant risk.
Our overall approach to fraud
Inquired with management, the
Audit Committee and internal
audit
Assignment and supervision
of appropriate audit
personnel
Evaluated the selection and
application of accounting
policies
Obtained written
representation from
management
Incorporated elements of
unpredictability into our
audit procedures
Maintained professional
scepticism
Our overall conclusion
We did not identify any actual or suspected fraud involving the group or
component management, employees with significant roles in the group’s internal
control or others, where the fraud resulted in a material misstatement in the group
financial statements.
Page 61

Page 62

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 08Wider Scope
Page 62

Page 63

Commentary on Wider Scope
Overall Summary
Page 63

Page 64

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
37
Commentary on Wider Scope
Wider Scope summary
As auditors appointed by the Accounts Commission, our wider scope responsibilities are set out in the Code of Audit Practice 2021 and sits alongside Best Value requirements detailed in
the Local Government (Scotland) Act 1973. The Code requirements broaden the scope of the 2024/25 audit and allow us to use a risk-based approach to report on our consideration of
the Council’s performance of best value and community planning duties and make recommendations for improvement and, where appropriate, conclude on the Council’s performance.
The Code’s Wider Scope framework is categorised into four areas:
• financial management;
• financial sustainability;
• vision, leadership and governance; and
• use of resources to improve outcomes.
Overall summary by reporting criteria
From the satisfactory conclusion of our audit work, we have the following conclusions:
Reporting criteria Commentary
page reference Identified significant risks? Actual risks identified? Other recommendations made?
Financial management 38 No No No
Financial sustainability 42 Yes – see risk 1 on page 43 Yes – see recommendation 1 on page 47 No
Vision, leadership and
governance 48 No No No
Use of resources to improve
outcomes 52 No No Yes – see recommendation 1 on page
56
Page 64

Page 65

Commentary on Wider Scope
Financial management
Financial management is concerned with financial capacity, sound
budgetary processes and whether the control environment and
internal controls are operating effectively.
Page 65

Page 66

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
39
Financial management
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Financial
management
culture
Financial forecasting is well embedded across the Council. The Council adopts long term
financial strategies, multi-year budget planning and a ten-year capital strategy. Officers carry
out biannual reviews to ensure financial forecasts are aligned to strategic priorities and
adequately consider the Council’s long-term financial stability. Regular financial discussions
between Chief Officers and service managers inform strategic decisions such as planning for
potential pension liabilities, cashflow management, and long-term financial sustainability.
The Council’s budget setting process is inclusive and iterative, with public consultation and
phased decision making across several consultation stages to align available resources with
strategic priorities. The persistent financial pressures faced by the Council means that budget
options are focused on closing funding gaps, which can limit opportunities for more priority
driven investment. However, savings plans are central to the Council’s financial strategy. These
are formally risk assessed, and are monitored throughout the year, with accountability clearly
assigned to Chief Officers and progress reported to elected members.
The Council has an extensive capital programme requiring significant financing to see projects
through to completion. This has contributed to the Council’s relatively high level of borrowing.
The Council’s unaudited borrowing liability at 31 March 2026 is £872.1m (£457.7m for General
Services and £414.4m for the Housing Revenue Account), with annual loan charge costs of
approximately £49m (£22m for General Services and £27m for the Housing Revenue Account).
The Council recognises the risk of borrowing, including the impact interest rate rises will have
on borrowing rates and the long-term pressure of borrowing costs on its revenue budget.
Officers have monitoring controls in place and actively consider the viability of capital projects
in terms of affordability, which they would adjust where necessary.
Overall, the Council’s financial
management culture is
appropriate and effective.
Reporting to senior management
and Council is timely, transparent,
and aligned with production of the
annual accounts. This supports
effective oversight and
decision-making. The Council’s
financial forecasting and savings
planning are embedded practices
that reflect a proactive approach
to managing constrained
resources.
No significant issues
identified.
Page 66

Page 67

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
40
Financial management (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Financial
management
culture
(continued)
In 2024/25, the Council reported a deficit in the provision of services of £25.9m and a reduction in
the General Fund of £2.9m, representing an overspend of 1% against the revised budget. This
reflected planned use of reserves, lower than anticipated capital receipts, reduced government
funding, inflationary pressures, rising interest rates, and increased service demand.
Accountability The Council has well functioning budgetary control arrangements that support timely and accurate
financial reporting. Monthly budget monitoring meetings with Chief Officers and service managers
enable early identification and investigation of variances, while regular reporting to elected
members provides clear visibility over in year performance, emerging pressures, future budget
gaps, and planned mitigations. Quarterly updates to the budget for the year are presented to
Council which include explanations for variances and forecasts for cumulative funding gaps,
demonstrating accountability and highlighting changes in cost pressures. Officers also present
budgetary control reports to Council and service committees four times a year.
The Council reinforces accountability through compliance with relevant governance frameworks
and financial reporting standards, adhering to the CIPFA/LASAAC Code. This is supported by
structured scrutiny via the Audit Committee. Equalities impact assessments and treasury
management reviews provide assurance that public funds are used appropriately and that wider
impacts are considered. The Council’s short term financial forecasting is reliable and is refreshed
regularly. This demonstrates the Council’s responsiveness to changing circumstances.
Overall, the Council has a history of producing accurate, standards compliant annual accounts
and managing in year budgets effectively, as confirmed by previous audits. However, longer term
forecasting remains more uncertain due to external factors such as fluctuations in government
funding, inflation, and interest rates. This is evidenced by changes in forecast budget gaps, for
example from £29.5m for 2027/28 in June 2023 to £26.9m in October 2024. While these shifts
illustrate the challenges of long-term financial planning, the Council mitigates this risk by regularly
updating forecasts and using the latest information to support reasonable and informed financial
planning decisions.
The Council’s accountability
arrangements are functioning
effectively.
The budgetary control
framework provides clear, timely
and transparent reporting that
supports informed
decision-making. Variances are
well-explained, and financial
performance information is
reliable and subject to
appropriate scrutiny. While
longer-term forecasting is
inherently uncertain, the Council
demonstrates a reasonable and
proactive approach to updating
its assumptions.
No significant issues
identified.
Page 67

Page 68

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
41
Financial management (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Arrangements to
prevent and detect
fraud, error and other
irregularities, bribery
and corruption
The Council has effective arrangements in place to prevent and detect fraud,
error, and irregularity, underpinned by comprehensive financial regulations.
These reflect current legislation and good practice, clearly defining responsibilities
for financial stewardship, procurement, delegated authority, and compliance for
both officers and members. Explicit processes for reporting breaches and
adherence to codes of conduct demonstrate that expected standards of behaviour
are actively promoted and embedded across the organisation.
Internal control is further supported by a well-established governance framework,
including:
• a whistleblowing policy;
• regular financial monitoring reports to senior officers and councillors;
• a strategic risk register; and
• annual risk-based internal audit work.
Internal Audit operates independently under a revised 2025 Internal Audit Charter
aligned with the Global Internal Audit Standards. It reports risk-rated findings and
graded opinions to the Audit Committee, ensuring control weaknesses are
identified, escalated, and addressed appropriately.
The finance function is led by qualified and experienced staff, including
CIPFA-qualified professionals with significant public-sector and audit experience.
Roles are clearly defined across key areas such as statutory accounts, budgeting,
council tax and Non-Domestic Rates compliance, supported by training. However,
the Council has ongoing resourcing pressures, with several experienced staff
approaching retirement . The Council recognises these risks and has begun to
respond through graduate recruitment and succession planning, although these
arrangements are not yet fully embedded.
Overall, the Council’s arrangements
for preventing and detecting fraud,
error, and irregularity are effective
and reflect a generally sound control
environment.
No significant issues identified.
Page 68

Page 69

Commentary on Wider Scope
Financial sustainability
Financial sustainability looks forward to the medium and longer term
to consider whether the body is planning effectively to continue to
deliver its services or the way in which they should be delivered.
Page 69

Page 70

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
43
Financial sustainability
Financial sustainability
Significant risks
Wehave outlined below the significant risks in arrangementsthat we have identified as part of our continuous planning procedures,and the work undertakento respond to each of
those risks.
SignificantRisk in Arrangements
Identified Work undertaken and the resultsof our work
1 Financialsustainability
The council has forecasted
significant cumulative budget gaps
rising from £9.2 million in 2025/26 to
£51 million in 2029/30. This is a
potential risk to its financial
sustainability, and its ability to
maintain its services for the people
of West Dunbartonshire.
Work undertaken
We reviewed the Council’s:
• long term financial strategy (LTFS) and reserves approach;
• financial position and track record in delivering planned recurrent and non recurrent savings in 2024/25;
• financial performance and planning updates for 2025/26, including impact on general reserves balances;
• budgetary control and financial reporting to Members; and
• progress in developing plans to address future years’ budget gaps.
Results of our work
▪ The Council has a policy on reserves and balances which:
▪ outlines the legislative and regulatory framework underpinning the creation, use or assessment of the adequacy of reserves;
▪ identifies the principles to be employed in assessing the adequacy of its balance and reserves; and
▪ sets out arrangements for the creation, amendment and use of reserves and balances.
▪ The Council continues to report regularly on reserves levels through its budgetary control reports. These are reported to the Corporate
Services Committee and general services reports are presented to Council meetings.
▪ The Council’s reserves are currently insufficient to meet projected medium to long term funding gaps, which are forecast to rise to
£52.9m by 2030/31, compared with total reserves of £13.1m at 31 March 2025, of which only £3.6m is unearmarked. Reserves fell due
to overspends in the year. The Council’s policy is to rebuild reserves over time and find additional sources of funding and savings to
bridge gaps. Utilisation of reserves is a last resort. At Period 7 (December 2025), uncommitted reserves were forecast to be £66k
above the 3% prudential target at 31 March 2026, which indicates that the Council has made some progress in rebuilding reserves.
Page 70

Page 71

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
44
Financial sustainability (continued)
Financial sustainability (continued)
Significant risks (continued)
. SignificantRisk in Arrangements
Identified Work undertaken and the resultsof our work
1 ▪ The Council has implemented a range of measures to address funding gaps, including savings programmes, vacancy controls, use of
reserves, and capital reductions. Measures such as use of reserves provide short term stability but are not sustainable given the scale
and recurring nature of the challenge. Some of the measures taken by the Council have provided recurring savings but these are not
sufficient to bridge future funding gaps.
▪ The Council agreed a balanced budget for 2025/26, including £4.6m of savings to address a £9.9m funding gap. Financial updates
during the year indicate a forecast favourable underspend, with reserves expected to remain above the 3% prudential target at 31
March 2026.
▪ The Council continues to demonstrate good practice in financial reporting, through regular budgetary control reports that cover revenue
and capital performance, significant variances, savings delivery and scenario planning. Budget working groups support early
identification and scrutiny of savings proposals.
Conclusion
The Council continues to face significant financial sustainability challenges, with substantial projected medium to long term funding gaps
and limited reserves capacity. Further progress is required to strengthen long term financial and reserves planning and to deliver the
transformational change necessary to address the scale of the financial challenge. See recommendation 1 on page 47.
Page 71

Page 72

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
45
Financial sustainability (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Financial planning The Council has well-established financial planning arrangements, with regular
budget updates, in-year monitoring, and multi-year financial forecasts that clearly
outline projected budget gaps and the key drivers behind them. Financial updates
presented to Council set out five-year budget forecasts, updated for changes in
inflation, interest rates and Scottish Government funding. The general services
budget paper presented to Council in March 2025 set out the following potential
cumulative budget gaps after agreed savings measures:
• 2025/26 - £5.571m
• 2026/27 - £16.304m
• 2027/28 - £25.786m
• 2028/29 - £40.779m
• 2029/30 - £49.863m.
This reflects recognised medium- and long-term pressures including sustained
reductions in Scottish Government funding, rising social care demand, unfunded
pension and pay costs, and volatility in borrowing costs.
The Council demonstrates awareness of these pressures through scenario
modelling, sensitivity analysis and risk reporting, and the issues are routinely
discussed at Council and committee meetings. However, the Council’s financial
position is very challenging, and it recognises it is unsustainable to rely on reserves
to manage short-term deficits. This is clear when you compare the cumulative
budget gap against £3.6m of uncommitted reserves at 31 March 2025.
The Council’s reserves policy is underpinned by clear governance arrangements,
including a prudential target and formal recovery requirement if the target threshold
is breached. The annual budget reports to Council include estimated prudential
targets and reserve balances for the coming year, laying out any expected use of
reserves where needed.
The Council has well-established
financial planning arrangements
that effectively identify
medium- and long-term risks, but
its capacity to address these risks
remains limited.
The Council’s reliance on
reserves and service reductions to
close budget gaps indicates the
challenges it faces in securing its
long-term financial sustainability.
A robust plan and strategy will be
required to address its longer-term
funding gaps.
Financial sustainability – Level 1
The Council continues to face a very
challenging financial position. This
presents a risk to its financial
sustainability, and its ability to maintain
the services it provides to the people of
West Dunbartonshire.
See page 47 for further information
and our recommendations made to the
Council.
Page 72

Page 73

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
46
Financial sustainability (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
The Council’s Long-Term Financial Strategy includes medium to long term projections for
revenue and capital positions, but does not forecast reserve levels. Financial planning could be
improved by including scenario modelling and reserves projections over the long term. This
would allow reserve recovery plans to be proactively identified and implemented.
In June 2025, the Council identified a short-term pressure on its 2025/26 budget with an £8.3m
budget gap, driven by rising borrowing costs, demand pressures and uncertainty around Health
and Social Care Partnership funding. Our review of the 57 savings proposals for 2025/26
highlighted cost efficiencies are increasingly based on reductions to frontline and community
services, including Education, Roads & Greenspace, and Community and Leisure services. This
raises concerns over the sustainability of the Council’s current approach to recovery and saving
plans.
Page 73

Page 74

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
47
Financial sustainability (continued)
Identified risks in financial sustainability arrangements and recommendations for improvement
As a result of our work we have identified risks in the Council’s financial sustainability arrangements. These identified risks have been outlined in the table below. We have assigned
priority rankings to each of them to reflect the importance that we consider each poses to your organisation and, hence, our recommendation in terms of the urgency of required
action; see Appendix F for further details.
Bl
an
k
Financial sustainability significant risks identified Recommendation for improvement Council’s response and implementation
timescale
1 Financial sustainability – Level 1
The Council is forecasting cumulative budget gaps rising from £5.21m
in 2026/27 to £52.88m by 2030/31. It understands the scale and
drivers of its medium and long-term financial pressures, but its
capacity to respond to these is constrained by limited reserves and
reliance on service reductions to balance budgets. It is unsustainable
for the Council to continue to rely on reserves and other short-term
measures to address funding gaps.
The Council should ensure it has a clear approach
to addressing its longer-term financial challenges,
including the extent to which this will be supported
by use of reserves. This includes ensuring its
reserves and financial strategy are aligned.
Management’s response:
No assumptions are made about use of reserves to
balance annual budgets as it is recognised the use
of reserves is a short-term fix and does not address 
the longer-term financial challenges. The Council
has a well-established budget working group
process which meets at least three times a year to
consider options for addressing budget gaps. 
Saving options developed through that process are
predominantly recurring in nature so contribute
toward setting an annual budget and future budget
gaps.
The Council’s medium to long term financial strategy
is to be reviewed and a revised version submitted to
Council in October 2026
Responsible officer:
Chief Officer Resources
Implementation date:
28 October 2026
Page 74

Page 75

Commentary on Wider Scope
Vision, leadership and governance
Vision, Leadership and Governance is concerned with the
effectiveness of scrutiny and governance arrangements, leadership
and decision making, and transparent reporting of financial and
performance information.
Page 75

Page 76

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
49
Vision, leadership and governance
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Clarity of plans to
implement the vision The Council has a clearly articulated strategic vision, set out in the
2022–2027 Strategic Plan, supported by well-defined priorities and
a coherent set of performance indicators. The four priority areas—
Our Communities, Our Environment, Our Economy, and Our
Council, provide a structured framework that guides operational
activity, resource allocation and performance monitoring.
This vision is consistently reflected across delivery plans, strategic
performance indicators and the Annual Report 2024/25. The
“golden thread” between high-level priorities, service-level actions
and performance outcomes shows that the Council’s vision is
embedded in decision-making, evaluation and forward planning.
Strategic actions for the 2025/26 period further align with these
priorities, indicating that the Council has clear arrangements in
place to translate vision into operational delivery.
The Council’s strategic vision is clear and
well-embedded across its planning and
performance framework. The alignment
between the Strategic Plan, delivery plans
and performance reporting demonstrates
that arrangements to implement the
strategic vision are well-structured and
consistently applied.
No significant risks identified.
Strategy and priorities The Council’s strategic priorities are aligned to community needs
and partner objectives and are informed by engagement including
annual community budget conversations, Citizens’ Panel feedback,
and targeted outreach to seldom-heard groups. The Council’s
strategic planning approach involves service-level 'Strategic Needs
Assessments' providing a detailed understanding of demographic,
social, economic and service-demand trends. These assessments
guide annual Delivery Plans and will support the development of
the next five-year Strategic Plan (2027–2032).
The Council’s strategy and priorities are
well aligned to community needs and
partner objectives.
No significant risks identified
Page 76

Page 77

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
50
Vision, leadership and governance (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Significant risks identified
Governance
arrangements The Council’s governance framework is built around full Council
meetings, service-specific committees, and the Audit Committee.
Council and Audit Committee meetings are consistently well attended,
with councillors demonstrating an appropriate level of scrutiny and
challenge.
Governance arrangements are appropriate and appear to operate
effectively. The Annual Governance Statement confirms alignment with
the CIPFA/SOLACE Framework, supported by a Local Code of
Corporate Governance. This includes an established risk-management
framework. The Council has well-structured performance management
arrangements, which link Delivery Plan actions to key performance
indicators, strategic indicators, risk registers and benchmarking results.
Regular mid-year and year-end performance reporting enables
members to assess progress and measure impact and outcomes.
Overall, the Council has well-structured
and effective governance arrangements.
These arrangements support informed
decision-making and oversight.
No significant risks identified.
Page 77

Page 78

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
51
Vision, leadership and governance (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Significant risks identified
Financial and
performance information The Council’s performance reporting is clear and comprehensive
with regular mid-year and year-end performance and financial
reporting. This includes reporting through the audited annual
accounts, budgetary control reports, and strategic performance
updates. These reports include key financial variances, savings
progress, and service-level performance indicators.
The Council has established annual service delivery plans that set
out specific improvement actions and KPIs. This sits within a wider
governance framework that includes annual Chief Officer
self-assessments, internal audit scrutiny and tracked improvement
actions, ensuring plans are regularly updated and evidence-based.
Internal audit is well-integrated into management and governance
processes. Risk-based plans are developed with Chief Officers, and
findings are acted upon through a structured response. Internal
audit findings directly inform the Annual Governance Statement,
demonstrating effective use of independent assurance.
Strategic Plan indicators have defined targets, trend data and RAG
status, supported by extensive year-on-year comparisons and
national benchmarking through the Local Government
Benchmarking Framework. Delivery Plans convert strategic
priorities into service-level KPIs and risk registers, creating a clear
flow from corporate objectives to measurable outcomes.
The Council produces regular, clear and
comprehensive financial and performance
reporting information.
No significant risks identified.
Page 78

Page 79

Commentary on Wider Scope
Use of resources to improve outcomes
Audited bodies need to make best use of their resources to meet
stated outcomes and improvement objectives, through effective
planning and working with strategic partners and communities. This
includes demonstrating economy, efficiency, and effectiveness
through the use of financial and other resources and reporting
performance against outcomes.
Page 79

Page 80

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
53
Use of resources to improve outcomes
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Resources deployed to
improve strategic
outcomes
The Council can demonstrate a clear link between financial resources
and the strategic outcomes achieved. Financial planning,
performance frameworks and delivery plans ensure that spending is
aligned with strategic priorities, while capital and revenue outturn
reporting provides transparent evidence of what is being delivered
through that investment. Outcomes are further tracked through
Strategic Plan indicators and participation in the Local Government
Benchmarking Framework, showing how resource deployment
contributes to service-level and strategic results.
The Council understands its key cost drivers including inflation,
interest rate volatility, unfunded pay awards and rising demand in
social care, which informs budget setting and resource allocation.
However, these pressures continue to grow at a pace that exceeds
the impact of current improvement activities.
The Council has implemented alternative delivery models in several
areas, including:
• digital modernisation through "Fit for Future“
• process redesign under the Standard Operating Model
• automation of high-volume transactions
• shared-service arrangements such as the joint Internal Audit &
Fraud service with Inverclyde Council.
Some models, such as revised school transport arrangements are
forecast to deliver significant recurring savings. However, the
Council’s financial and staff capacity constraints has limited the
progress of other initiatives.
The Council makes effective use of resources
to support improved outcomes, with clear
links between spending, delivery and
performance. The Council has implemented
alternative service delivery models in several
areas; however, resource constraints have
affected its ability to make further progress.
No significant risks identified.
Page 80

Page 81

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
54
Use of resources to improve outcomes
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Needs of service users
being met The Council demonstrates a commitment to incorporating resident
views into service delivery and decision-making through a range of
engagement mechanisms, including public consultations, Budget
Conversations, a Citizens Panel, surveys, and targeted outreach via
community facilities such as libraries. These approaches are
complemented by initiatives such as the ‘Working4U’ service, which
supports digital inclusion and helps broaden participation, with
engagement outcomes publicly reported to ensure transparency and
inform priorities.
The Council uses detailed delivery plans to guide how each service
contributes to its strategic priorities. These plans outline specific
actions, address performance challenges, and reflect service-level
priorities. Each plan includes measurable performance indicators and
annual targets, allowing the Council to track progress and drive
continuous improvement. Updates are reported mid-year and at year-
end to service committees and are made publicly available on the
Council’s website, ensuring transparency and accountability.
The Council demonstrates effective use of
engagement and feedback mechanisms to
ensure resources are aligned with the
needs of service users, and resident views
materially influence service planning and
budget decisions.
No significant risks identified.
Page 81

Page 82

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
55
Use of resources to improve outcomes (continued)
Our overall assessment
Area assessed Our findings Our judgements Significant risks identified
Arrangements to
deliver continuous
improvements in
priority services
The Council provides transparent and robust information on service improvement
through the Annual Report, Management Commentary and performance reporting
frameworks. This includes measurable examples of improvement, such as top-five
national performance in narrowing the attainment gap, progress on City Deal and
Levelling Up projects, expansion in housing stock, and strengthened community
programmes.
The Council can demonstrate sustained positive progress in educational attainment,
positive destinations, housing delivery, community support and major regeneration
activity. Benchmarking through the Local Government Benchmarking Framework
(LGBF) indicates that for 2024/25 roughly half of indicators have improved and that
the Council performs at or above the Scottish average in several areas. Some of the
other LGBF indicators, however, indicate a risk around the Council’s ability to deliver
continuous improvements in services. For instance, the ratio of financing costs to net
revenue stream for the general fund is 7.3% for 24/25, compared the Scottish
average of 6%. High borrowing and financing costs will constrain budgets and the
Council’s ability to fund improvement in priority services. 
The Council’s pace and depth of improvement is not yet sufficient to ensure services
are sustainable in the longer-term and to realise its strategic priorities. Individual
transformation initiatives (e.g., chatbot automation, housing system modernisation
and the Glencairn House redevelopment) show clear benefits but lack the scale to
have a significant impact. Performance against the 2022–27 Strategic Plan is mixed.
Of the 50 Strategic Plan indicators, 30 were met or exceeded service, 11 narrowly
missed target and nine significantly missed targets. There was under-performance in
some areas such as environmental quality, neighbourhood maintenance, customer
experience and resident satisfaction. Targets were exceeded in areas including
education attainment, use of landfill and number of online transactions.
The Council has arrangements in
place that support continuous
improvement in priority services,
and measurable progress is evident
across several key outcome areas.
The Council must ensure the pace
and depth of improvement is
sufficient to ensure it achieves its
strategic priorities and sustains the
level and quality of services
expected by residents, particularly in
the context of escalating financial
risks.
Conclusion
If the pace of improvement does
not accelerate, the Council risks
declining service quality and
reduced public satisfaction. This
may undermine the Council’s
ability to deliver its strategic
priorities.
See page 56 for further information
and our recommendations made to
the Council.
Page 82

Page 83

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
56
Use of resources to improve outcomes (continued)
Identified risks in Use of resources to improve outcomes and recommendations for improvement
As a result of our work we have identified risks in the Council’s use of resource to improve outcomes. These identified risks have been outlined in the table below. We have assigned
priority rankings to each of them to reflect the importance that we consider each poses to your organisation and, hence, our recommendation in terms of the urgency of required action;
see Appendix F for further details.
Bl
an
k
Use of resources to improve outcomes significant risks
identified Recommendation for improvement Council’s response and implementation timescale
1 Progress in delivering strategic priorities – Level 2
The Council has a clear strategic framework, but
improvement activity is not progressing at a pace sufficient
to mitigate its financial and operational pressures. Its
performance reporting against the 2022–27 Strategic Plan
shows mixed progress, with under performance in areas
including environmental quality, neighbourhood
maintenance, customer experience and resident
satisfaction. If the pace and depth of improvement does not
accelerate, the Council risks declining service quality and
reduced public satisfaction. This may undermine its ability
to deliver its strategic priorities.
The Council should review the areas where it is not
on track to achieve its strategic priorities and identify
actions to address this.
Management’s response:
The Council acknowledges and will continue to focus on the
small number of indicators not on track. These largely relate
to satisfaction and perception measures which are
influenced by the ongoing financial challenge and reflect
wider national trends. All areas are supported by action
plans and regular performance monitoring. In addition,
further analysis has been undertaken to better understand
the drivers of dissatisfaction, with survey questions
strengthened to require respondents to provide reasons
where negative views are expressed. This will support more
targeted, evidence-based improvement actions while
ensuring continued oversight of progress across all
priorities.
Responsible officer:
Chief Executive
Implementation date:
Ongoing
Page 83

Page 84

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2). 09Best Value
Page 84

Page 85

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
58
Best Value (continued)
Overall summary by reporting criteria
From the satisfactory conclusion of our audit work, we have the following conclusions:
Reporting criteria Commentary page
reference Identified risks? Actual risks identified? Other recommendations made?
Best Value 59 No No
One prior year recommendation
is still to be fully implemented,
see pages 68 and 69.
Effectiveness of
performance reporting 70 No No No
Thematic reviews 73 No No Yes – see recommendations on
pages 73 and 74.
Statutory Performance
Indicators 77 No No
One prior year recommendation
is still to be fully implemented,
see pages 79.
Page 85

Page 86

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
59
Best Value
Best Value summary
Under the Code of Audit Practice, the audit of Best Value is fully integrated within our annual audit work. We are required to assess the seven Best Value themes at the Council
over the period of the audit appointment. We have used a risk-based approach that is proportionate to the size and type of the body, to assess whether the Council has made
proper arrangements for securing Best Value and is complying with its community planning duties. We have also followed up on previously reported Best Value findings and have
assessed the pace and depth of improvement implemented by the Council.
At least once every five years, the Controller of Audit will report to the Accounts Commission on the Council’s performance in meeting its Best Value duties. We conduct thematic
reviews as directed by the Accounts Commission. In 2024/25 this will be about transformation. We have prepared a separate management report to document the findings of this
work which can be found on Audit Scotland’s website: BV 24-25 West Dunbartonshire Council.
Performance Audit and Best Value staff also prepare a report for the Controller of Audit using information and judgements on the pace and depth of continuous improvement
reported in this Annual Audit Report. The Controller of Audit Report for West Dunbartonshire Council will be presented to the September 2026 Accounts Commission meeting.
At the planning stage of the audit, we undertook work to understand the arrangements that the Council has in place under each of the reporting criteria and we considered whether
there were any risks to our audit in those arrangements. We have kept our understanding of arrangements under review and updated our risk assessment throughout the audit to
reflect emerging issues that may suggest significant risks in arrangements exist. The following slides outline the work that we have undertaken for each of the seven Best Value
themes and any improvements or risks in arrangements that have been identified as part of our assessment. We have reported recommendations for the risks identified.
Page 86

Page 87

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
60
Best Value (continued)
Our overall assessment of the Best Value themes (continued)
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Vision and
leadership See page 47 for the findings of our wider
scope work on vision and leadership
The Council’s strategic vision is clear and
well-embedded across its planning and
performance framework. The alignment
between the Strategic Plan, delivery plans
and performance reporting demonstrates
that arrangements to implement the
strategic vision are well-structured and
consistently applied.
The Council’s strategy and priorities are
well aligned to community needs and
partner objectives.
None identified. No significant risks identified.
Governance and
accountability See page 48 for the findings of our wider
scope work on governance.
Overall, the Council has well-structured and
effective governance arrangements. These
arrangements support informed
decision-making and oversight.
None identified. No significant risks identified.
Effective use of
resources See page 51 for our findings on how the
Council is ensuring its resources are
deployed to improve strategic outcomes.
The Council makes effective use of
resources to support improved outcomes,
with clear links between spending, delivery
and performance. The Council has
implemented alternative service delivery
models in several areas; however, resource
constraints have affected its ability to make
further progress.
None identified. No significant risks identified.
Page 87

Page 88

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
61
Best Value (continued)
Our overall assessment of the Best Value themes (continued)
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Partnerships and
collaborative
working
The Council works closely with Community Planning
West Dunbartonshire (CPWD) to deliver partnership-led
approaches that respond directly to community need. In
2024/25, CPWD adopted a themed focus on
anti-poverty activity, including a geographically targeted
pilot and the establishment of the Family Prosperity
Network, bringing together third-sector partners and
employers to address child poverty. This approach
reflects feedback gathered from residents and
community groups and demonstrates effective use of
local insight to inform partnership work.
The Council also has a range of partnership and
collaborative initiatives to improve outcomes and
achieve efficiencies. This includes a Net Zero
Cooperation Agreement with Glasgow City Council to
deliver shared priorities such as electric waste vehicles,
active travel, and sustainability, helping to reduce
duplication and generate financial savings.
The Council has demonstrated
effective partnership working that
supports community led outcomes,
secures significant external
investment, and promotes
collaboration across local, regional,
and national initiatives. However,
the Council’s limited use of formal
shared service arrangements
indicates there is further scope to
improve partnership and
collaborative working with public
sector partners.
None identified. No significant risks identified.
Page 88

Page 89

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
62
Best Value (continued)
Our overall assessment of the Best Value themes (continued)
BV 24-25 West
Dunbartonshire Council
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
At a national level, the Council participates in initiatives
such as the Digital Office and SOLACE workstreams,
which provide access to tools, training, and collaborative
forums on digital transformation and artificial intelligence.
While partnership working is well established
strategically, officers noted that formal shared service
arrangements with other councils remain limited,
reflecting a wider sector challenge. Further detail on
these themes and partnership approaches is set out in
the Best Value Thematic Review Report published on
the Audit Scotland website: BV 24-25 West
Dunbartonshire Council.
Page 89

Page 90

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
63
Best Value (continued)
Our overall assessment of the Best Value themes (continued)
BV 24-25 West Dunbartonshire
Council
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Working with
communities The Council applies a service design approach through
its Fit for Future reviews, actively involving users in
service redesign, supported by staff training and
established communities of practice. Engagement with
pupils and parents during the school catering review
directly informed changes to service delivery,
demonstrating responsiveness to feedback.
The Glencairn House project is currently underway, with
Dumbarton’s oldest building being transformed into a
state-of-the-art library, museum, and community hub.
This project involved extensive consultation, including
surveys and drop-in sessions, and received strong
community support. Targeted engagement with seldom
heard groups shaped accessible design features and
programme content.
The Council conducts quarterly telephone satisfaction
surveys and uses a Citizens Panel to capture wider
user views. Feedback is reported to the Corporate
Management Team and published on the Council’s
public performance reporting webpages, promoting
transparency. Further detail is available in our Best
Value Thematic Review Report published on the Audit
Scotland website: BV 24-25 West Dunbartonshire
Council
The Council includes community
consultation as a key part of
service redesign and
transformation projects. It also
regularly seeks more general
feedback from its residents.
None identified. No significant risks identified.
Page 90

Page 91

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
64
Best Value (continued)
Our overall assessment of the Best Value themes (continued)
Area assessed Our findings Our judgements Service improvement
considerations Significant risks identified
Sustainability We did not assess this theme in 2024/25. N/A N/A N/A
Fairness and equality We did not assess this theme in 2024/25. N/A N/A N/A
Page 91

Page 92

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
65
Best Value (continued)
Follow up of previously-reported recommendations
We are required to follow up Accounts Commission findings, Controller of Audit recommendations and any outstanding improvement actions reported in Best Value Assurance Reports
and Annual Audit Reports.
In October 2025 we reported two new recommendations to the Council to address risks identified from our Best Value audit and concluded that a previous recommendation was still
unresolved. As part of our work in 2024/25, we followed up the progress made by the Council against the recommendations made and determined whether the risk(s) remained during the
year.
b
l
a
n
k
Best Value finding as previously
reported
Management response and
implementation timeframe Work undertaken and judgements made in 2024/25 Conclusions reached
1 Workforce data – Level 2
The Council should ensure
workforce data allows officers to
identify resource gaps and supports
succession planning.
Management Response: Action is
agreed as already part of planned
developments to console.
Responsible officer: Chief Officer
P&T/Strategic People & Change
Manager
Implementation timescale: March
2025
Progress against the recommendation
During 2024/25, the Council strengthened its workforce planning
arrangements by updating its Workforce Planning Toolkit, which
is a set of practical resources designed to help managers
forecast staffing and plan for future skills. The Council also
introduced Succession Planning Guidance in February 2025,
which explains how to identify critical roles, assess successors,
and create development plans. This guidance was supported by
standard templates, including a succession planning status
sheet to record risks, readiness levels, and priority actions for
key posts.
The Council launched Phase 1 of succession planning for senior
leadership roles in March 2025. This included issuing an
information pack to senior managers outlining the process,
timelines, and tools available, and providing support through
People & Change advisers.
In addition, the Council enhanced its Workforce Planning
Console, the main digital system used by managers to access
real-time workforce data.
Complete
The Council has implemented
the core elements needed to
use workforce data effectively
for identifying resource gaps
and supporting succession
planning. Governance, tools,
and system improvements are
in place, and managers are
engaging with them. Remaining
enhancements (such as
predictive analytics) are planned
for future phases of the work
programme..
Page 92

Page 93

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
66
Best Value (continued)
Follow up of previously-reported recommendations (continued)
b
l
a
n
k
Best Value finding as previously
reported
Management response and
implementation timeframe Work undertaken and judgements made in 2024/25 Conclusions reached
New features added during the year included:
• A tool to analyse voluntary severance and early retirement
trends
• Integration of training records and skills passports so
managers can see completed and outstanding learning
• A new Finance dashboard to support workforce cost
planning.
While these developments represent good progress, advanced
features such as automated workforce forecasting and
predictive analytics are still under development and not yet
available for routine use.
Training sessions were delivered to managers to improve
understanding and use of the console. Usage data shows a
significant increase, from an average of eight daily users in April
2024 to 31 by March 2025, indicating wider adoption across
services.
Page 93

Page 94

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
67
Best Value (continued)
Follow up of previously-reported recommendations (continued)
b
l
a
n
k
Best Value finding as previously
reported
Management response and
implementation timeframe Work undertaken and judgements made in 2024/25 Conclusions reached
2 Hybrid and flexible working
policy– Level 3
The Council should develop a new
flexible/hybrid working policy or
update its existing policy.
Management’s response: Action is
agreed as already part of planned
policy review and will likely only
require an update.
Responsible officer: Chief Officer
P&T/Strategic People & Change
Manager
Implementation date: December
2024
Progress against the recommendation
The Council updated its Flexible Working Policy in April 2024 to
reflect current legislation and modern working practices.
The updated policy formally links to Remote Working Guidance,
which sets out different work styles (such as home-based,
mobile, and hybrid arrangements), and to the new Right to
Disconnect Guidance introduced in July 2024. This guidance
explains how employees can switch off outside working hours
and includes practical advice on email etiquette, meeting
scheduling, and wellbeing.
To support managers in applying the policy consistently, the
council issued Manager’s Guidance on Processing Flexible
Working Requests in July 2024. This provides step-by-step
instructions, timelines, and template letters for approvals and
appeals.
Complete
The Council has updated its
policy and supporting guidance
to reflect current practice and
legislative requirements.
Page 94

Page 95

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
68
Best Value (continued)
Follow up of previously-reported recommendations (continued)
b
l
a
n
k
Best Value finding as
previously reported
Management response and implementation
timeframe
Work undertaken and judgements made in
2024/25 Conclusions reached
3 Staff absence– Level 2
Some staff are finding the pace of
change challenging and staff
absence remains an issue. The
council is taking positive steps to
try and address this and should
continue to explore opportunities
for improvement.
Further recommendation
The Council should implement a
focused attendance improvement
plan that strengthens early
intervention, enhances
management capability, and uses
data more effectively to address
the main drivers of short-term
absence. This should be
supported by clearer performance
measures to assess the impact of
wellbeing initiatives on reducing
absence and associated costs
Management’s response: After the improvement
in sickness absence in 2023/24 there has been a
slight increase in 2024/25 to 14.34 FTE days per
FTE employee. This was the first time sickness
absence levels had increased since 2021/22 and is
in the context of high sickness absence levels in
the wider UK labour market as evidenced by the
2025 CIPD Health and Wellbeing at Work Report.
Additionally, sickness absence to date in 2025/26
has reduced compared to the same period in
2024/25 indicating a more positive position than the
previous year. Additional provisions to support
employee wellbeing have been introduced through
changes to the family friendly leave policies such
as neo natal leave, paternity leave and shared
parental leave. Improvements have been made to
ensure absence data is available to managers in
real time at an individual and service level to
support good management practice.
Responsible officer: Chief Officer People &
Technology
Implementation date: N/A – measures to manage
sickness absence are part of routine ongoing
activity.
Progress against the recommendation
The Council continues to promote employee
wellbeing support, with strong increases in
employee engagement. Vivup (employee benefits
platform) registrations rose by 82%, and My
Money Matters (financial wellbeing platform) saw
a 51% increase, giving staff easier access to
wellbeing and financial resources. The Council
has launched a new Vivup-led Employee
Assistance Programme, offering self-help tools,
counselling and immediate support. A refreshed
Cycle to Work scheme is also now available
year-round with a wider range of suppliers.
The 2024/25 LGBF data showed sickness
absence increased to 15.9 FTE days per FTE
employee, which is a 5.3% increase from 23/24
and above the Scottish local authority average of 
14.5 days. The top reasons for absence remain
minor illness, personal stress and acute medical
conditions.
Ongoing
The Council has made progress in
addressing  staff absence and
wellbeing. It has implemented a
broader and more accessible
wellbeing framework, strengthened
attendance management processes,
and enhanced reporting capability
within its workforce systems. There
is also evidence of increased
employee engagement with the
wellbeing offer and improved
management oversight of
attendance.
However, despite these
developments, sickness absence
remains a significant and persistent
challenge. While the Council has
taken forward the actions set out in
its earlier improvement plan, further
work is required to ensure these
measures lead to sustained
improvements in attendance
outcomes.
Page 95

Page 96

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
69
Best Value (continued)
Follow up of previously-reported recommendations (continued)
b
l
a
n
k
Best Value finding as previously
reported
Management response and
implementation timeframe Work undertaken and judgements made in 2024/25 Conclusions reached
Officers presented an 'Employee Wellbeing - Annual
Update 2024/25' paper to Joint Consultative Forum in
June 2025. This provided a detailed analysis and update
on wellbeing and attendance up until 31 March 2025.
Some of the key findings include:
• The proportion of absence that is considered long
term has decreased and is down to approximately
66%, a decrease of 14% compared to 2023/24. Long
Term illness being over four weeks off at any time.
• From 1 April 2024 to 31 March 2025, a total of 66,606
FTE days were lost due to sickness absence across
the Council.
• The estimated cost of lost productivity from absences
was £11.8m.
Management response:
In June 2026 a report will be presented to
Joint Consultative Forum confirming that
FTE days lost has decreased by 1,381
compared to the previous
year. Additionally in 2025/26, a review of
Employee Wellbeing continued using the
Council’s ‘Fit for Future’ approach. This
holistic review focuses on the application
of the Supporting Employee Wellbeing
policy and has already delivered
improvements to the return-to-work
process, will improve data quality,
reporting and reduce manual effort
through automation. Work is now
underway on managing intermittent
absences, with early improvements
identified. During 2026/27, these changes
will continue to be implemented and work
will begin on long-term absence
management process. Improved data will
then inform stronger management support
and clearer evaluation of intervention
effectiveness.
Responsible officer: Chief Officer
People & Technology
Timescale: 31 March 2027
Page 96

Page 97

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
70
Best Value (continued)
Effectiveness of performance reporting
Effective performance management arrangements should be in place to promote the effective use of the local authority’s resources. Performance is systematically measured across
all areas of activity, and performance reports are regularly scrutinised by managers and elected members. The performance management system is effective in addressing areas of
underperformance, identifying the scope for improvement and agreeing remedial action.
We have outlined below a summary of what the Council is reporting in relation to service performance including the Council’s assessment of progress against its service priority
measures and reporting on its relative performance (from the Local Government Benchmarking Framework and other information used locally).
Effectiveness
of performance
reporting
theme
Our findings Our judgements Our conclusions Significant risks
identified
Effective
performance
management
The Council demonstrates a well-established approach to
performance management that supports continuous improvement
and transparent accountability. Strategic priorities are clearly defined
within the Strategic Plan 2022–27, supported by measurable
outcomes, indicators and detailed delivery plans that ensure a clear
line of sight from high-level objectives to operational activity. Regular
reporting to elected members provides a balanced, evidence-based
view of progress, highlighting both areas of strong performance and
those requiring improvement. Variances are consistently explained,
and the Council takes corrective action through targeted improvement
plans, recovery measures and strengthened governance oversight.
Public performance reporting is clear and accessible, incorporating
comparative analysis through the LGBF and presenting multi-year
trends that help residents understand how the Council is performing
over time. Engagement with communities is well embedded through
surveys, Citizens’ Panels, budget consultations and service-specific
engagement, and this feedback is actively used to contextualise
performance trends and inform improvement activity.
The Council has effective
performance management
arrangements in place, with clear
targets, regular and transparent
reporting, and a structured
approach to identifying and
addressing under-performance.
Improvement actions are
consistently developed, monitored
and aligned to strategic priorities,
demonstrating active
management and a clear
commitment to continuous
improvement. The overall
framework provides assurance
that performance is being
effectively managed.
The Council has effective
performance management
arrangements in place.
No significant risks
identified.
Page 97

Page 98

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
71
Best Value (continued)
Effectiveness of performance reporting (continued)
Effectiveness
of performance
reporting
theme
Our findings Our judgements Our conclusions Significant risks identified
While some strategic risks around financial sustainability, workforce
resilience and environmental targets remain challenging, the Council’s
performance framework provides a robust foundation for managing these
pressures. Overall, the evidence indicates that the Council has the key
characteristics of effective Best Value: clear priorities, transparent
reporting, active performance management and a commitment to
continuous improvement.
Page 98

Page 99

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
72
Best Value (continued)
Effectiveness of performance reporting (continued)
Effectiveness
of performance
reporting
theme
Our findings Our judgements Our conclusions Significant risks
identified
Improvement
plans The Council’s mid-year performance report demonstrates that the Council
puts improvement plans in place when targets are missed, with services
identifying reasons for under-performance and setting clear corrective
actions. Improvement actions are supported by robust data, including
benchmarking through the LGBF, citizen and service-user feedback,
financial and workforce analysis, and risk assessments that highlight where
further action is required. Examples such as responses to rising youth
homelessness, recycling improvements, reserve recovery actions, and
service redesigns in neighbourhood services show that the Council identifies
under-performance early and puts practical mitigation in place.
The Annual Report 2024/25 demonstrates that the majority of internal
indicators show positive progress, with 60% meeting or exceeding annual
targets (rising to 82% when narrowly missed targets are included).
The LGBF data for 2024/25 shows that an average of 56.9% of indicators
have improved since the base year in 2010/11, with the Council’s
performance falling slightly below this benchmark, with 54.6% improving.
This places the Council 20th out of 32 in Scotland. The year-on-year
comparison is 45.37% in improvements on indicators. This is an
improvement form the prior year where only 35.24% were shown to have 
improved in the year.
As reported in the Wider Scope section of this report, some of the LGBF
indicators indicate a risk around the Council’s ability to deliver continuous
improvements in services (see page 53).
The Council has effective
improvement plans, with
under-performance identified
early and supported by clear,
targeted actions that are
monitored through
established governance
processes.
However, its current pace and
depth of improvement is not
yet sufficient to ensure it
achieves its strategic priorities
and sustains the level and
quality of services expected
by residents, particularly in
the context of escalating
financial and operational
risks.
The Council
acknowledges the
breadth of challenges
and has improvement
plans in place to mitigate
the risk of falling
performance. It should
ensure these cover areas
where it is not on track to
achieve its strategic
priorities (see
recommendation 1 on
page 54).
No significant risks
identified.
Page 99

Page 100

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
73
Best Value (continued)
Thematic reviews
The Accounts Commission reports nationally on thematic aspects of local government bodies’ approaches to, and performance in, meeting their Best Value and community
planning duties. As appointed auditors of the Council we are required to report on Best Value and related thematic work as prescribed by the Accounts Commission. For the
thematic work in 2024/25, we are required to carry out an overview of transformation. As part of this review, we are required to report on the areas documented in the table below.
The full thematic review report for the Council can be found on the Audit Scotland website: BV 24-25 West Dunbartonshire Council.
Thematic themes Our findings Our judgements Risks identified
Transformation
planning The Council’s Strategic Plan sets out a clear
commitment to service improvement and
transformation, supported by well defined priorities
and performance reporting. While transformation
activity is embedded across services and linked to
strategic objectives, there is no single, standalone
transformation programme bringing together all
projects and workstreams, which limits visibility of
collective progress and impact.
Although transformation initiatives are contributing to
savings and informing budget decisions, the Council
recognises they will not, on their own, address
medium and long term financial challenges. The
absence of consolidated monitoring of transformation
costs and benefits means the Council cannot clearly
demonstrate how transformation activity supports
long term financial sustainability, despite otherwise
robust performance monitoring against Strategic
Plan priorities.
The Council has a clear strategic direction and
effective performance reporting arrangements.
However, the Council does not monitor and
report on the overall costs, savings and
outcomes from its transformation projects.
There is also no consolidated public reporting
on transformation.
This weakens the Council’s ability to evidence
how transformation supports long term
sustainability.
Reporting Transformation Outcomes (Level 2)
Risk: The council cannot measure and demonstrate to
stakeholders how effectively it is delivering its service
improvement and modernisation strategic priorities.
Recommendation: The council should review how it
reports on transformation to ensure it can clearly
demonstrate the costs, savings and outcomes from
transformation projects to stakeholders.
Management’s response: The Council will carry out a
review of current transformation reporting to ensure it
provides a balance between proving sufficient
information to stakeholders and not creating an
excessive demand on limited resource. Any identified
changes to current reporting will be implemented in the
2027/28 financial year.
Responsible officer: Chief Executive Officer
Implementation date: 31 March 2027
Page 100

Page 101

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
74
Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Programme
management The Council has put in place formal governance arrangements
to oversee transformation activity, including the Strategic Risk
and Resilience Strategic Reflective Review Panel and the
Transformation and Visioning Board. A consistent corporate
approach to project management is in place, and work is
ongoing to further strengthen project and change management
disciplines across the organisation.
The Council’s Digital and Change teams possess strong
specialist expertise and actively engage with national networks
and best practice. However, these teams are small and operate
with limited capacity, restricting the Council’s ability to deliver
transformation at the scale and pace required to meet its
ambitions.
Senior leadership receives regular and structured updates on
transformation progress through bi monthly reports to the
Transformation and Visioning Board, alongside financial
monitoring via Budgetary Control Reports. While elected
members receive information on savings delivery through
budget processes and senior officer updates, they do not have
full oversight of wider transformation outcomes, limiting their
ability to assess the overall effectiveness and impact of
transformation activity.
The council’s Digital and Change teams
have specialist skills and are well
connected to national networks. However,
these are small teams with limited capacity.
Resourcing and capacity to deliver
transformation (Level 2)
Risk: The council does not have sufficient
resources to deliver transformation at the scale
and pace it desires.
Recommendation: The council should review
whether it has sufficient resources to achieve its
service improvement and modernisation
priorities and, if necessary, consider options for
increasing capacity.
Management response: The Council has
recently reviewed capacity to support the
delivery of transformation and put in place
funding to secure additional capacity to support
fit for future reviews.
Responsible officer: Chief Executive Officer
Implementation date: 31 March 2026
Page 101

Page 102

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
75
Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Partnership working
and community
engagement
The Council works effectively with partners, including through
Community Planning West Dunbartonshire and national
collaborations, to support transformation activity, access external
funding and share expertise. This partnership working enhances the
Council’s ability to deliver more complex change initiatives.
All Council engagement activity is co-ordinated through the engaging
communities framework led by the Council’s performance and
strategy team. This includes project-based engagement and all wider
consultation activity undertaken by the Council, including the budget
conversation.
Community engagement is embedded within transformation activity
and has influenced decisions in specific projects, such as catering
services and cultural regeneration. However, engagement activity is
largely project based and is not coordinated through a single
corporate transformation framework.
The Council demonstrates awareness of the impact of transformation
on vulnerable groups and has taken steps to mitigate risks such as
digital exclusion. Equality Impact Assessments are undertaken for
major projects, supported by targeted engagement with seldom
heard communities.
The Council demonstrates good partnership
working and consideration of equality
impacts. However, engagement and
inclusion activity is fragmented across
projects. This limits assurance that
transformation is being delivered consistently
and inclusively at a corporate level.
No significant issues identified.
Page 102

Page 103

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
76
Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Impact of
transformation The Council has defined success measures for
major transformation projects, focusing mainly on
financial savings and operational efficiencies, with
limited reporting on wider social or equality
outcomes. While individual projects demonstrate
clear benefits, there is no consolidated corporate
overview of transformation benefits.
Progress is communicated through committee
reports, Strategic Plan updates and public
performance reporting. However, there is no single,
consolidated public report that brings together the
overall impact and outcomes of the Council’s
transformation activity.
The Council can evidence benefits at individual
project level and communicates progress
through existing reporting channels. However,
the absence of consolidated oversight and
public reporting limits transparency and
understanding of the overall impact of
transformation.
Reporting Transformation Outcomes  (Level 2)
See page 73 for details of the risk, recommendation
and management’s response.
Page 103

Page 104

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
Best Value (continued)
Best Value (continued)
77
Statutory PerformanceIndicators
Weare requiredto reporton the Council’s effectivenessand appropriatenessof arrangementsin place forcomplying with the Direction issued in December 2021, including the
balance and timeliness of reportingtomembersalong with its accessibility forcitizens and communities.
Thetable below details our overall assessmentof theCouncil’s statutoryperformanceindicators arrangements:
Council’s
arrangements Our findings Our judgements Risks identified
StatutoryPerformance
Indicator1: Improving
local services and
local outcomes
Statutory Performance Indicator (SPI) 1 requires a council to report its performance
in improving local public services and progressagainst agreed desired outcomes.
The council’s public performance reporting (PPR) provides a clear, accessible, and
balanced overview of how services are performing against priorities, drawing on a
wide range of indicators, trend data, and narrative explanation. Reports present
performance openly, highlighting both achievements (e.g., targets exceeded across
education, leisure, and waste reduction) and areas where performance is below
target, with transparent explanations and planned improvement actions. The use of
multi-year trend data, citizen feedback, and contextual narrative ensures that
reporting is balanced and easy to understand, giving residents and elected
members a well-rounded picture of progress against strategic priorities over time.
The Annual Report 2024/25, which is published on the PPR area of the Council’s
website, clearly demonstrates strong community engagement by incorporating
extensive resident feedback throughout its performance sections. Each strategic
priority includes findings from large-scale public surveys such as the Telephone
Survey with 900 residents and the Citizens’ Panel with 309 participants,
summarising what residents said about services and satisfaction with how the
Council runs things. The PPR area also has a dedicated 'Comparative
Performance' section, comparing the Council’s performance with all Scottish
councils, its designated family-group peers through the LGBF, and against its own
prior year performance.
The Council’s public performance
reporting is clear, balanced and
accessible, providing strong
transparency over service
performance. It makes effective
use of trend data, benchmarking
and resident feedback to present
a well-rounded view of progress.
This supports informed scrutiny
by elected members and
enhances accountability to the
public.
No significantissues identified.
Page 104

Page 105

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
Best Value (continued)
78
Statutory PerformanceIndicators(continued)
Council’s
arrangements Our findings Our judgements Risks identified
StatutoryPerformance
Indicator2: Demonstrating
Best Value
Under SPI 2 requirements,councils must reportboth their own
evaluations and thoseconductedby external audit, scrutiny, and
inspection bodies regardingtheir performancein meeting the duty of Best
Value. Additionally, councils are expected to disclose how they have
responded to these assessments.This ensures transparencyand
accountability in public service delivery and continuous improvement.
The Council demonstrates clear and well-established arrangements for
assessing performance against its Best Value duty, supported by
Strategic Plan reporting, benchmarking through the LGBF, self
evaluation and service level reviews. These assessments are subject to
elected member scrutiny and external audit, with improvement actions
identified, monitored and linked to agreed management responses.
However, one outstanding issue remains from prior year audit follow
ups, relating to SPI2 expectations of visibility of school inspection
reports and associated action plans. Our recommendation remains
outstanding regarding the accessibility of information on external
scrutiny and inspection outcomes, particularly school inspection reports
and related action plans. While the Council responds to external
assessments, it does not yet clearly publish its own consolidated
account of how it has addressed findings from audit and inspection
bodies.
The Council has robust processes
for assessing and scrutinising Best
Value performance. However,
transparency over how external
inspection findings are addressed
could be improved. Addressing this
would strengthen public
accountability and assurance over
how the Council is demonstrating
Best Value.
See page 79 for furtherinformation
and follow up on our
recommendations made to the
Council.
Page 105

Page 106

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
Best Value (continued)
Best Value (continued)
79
Follow up of previously-reported recommendations
We are required to follow up findings from our review of statutory performance indicators in the previous years.
In October 2025 we reported one recommendation to the Council to address risks identified from our review of statutory performance indicators . As part of our work in 2024/25, we
followed up the progress made by the Council against the recommendations made and determined whether the risk(s) remained during the year.
Best Value findingas
previously reported
Management
response and
implementation
timeframe
Work undertaken and judgements made in 2023/24 Conclusionsreached
1 SPI 2: Demonstrating Best
Value (Level 2)
The Council does not fully
comply with the requirements
of SPI 2.
Recommendation – The
Council should ensureit
publishes details of how it
has responded to external
audit and inspection reports.
ManagementResponse:
Work is ongoing and is targeted
to be complete by the end of
2025
Responsible officer:Chief
Officer Education
Implementationdate: 31
December 2025
Progress against the recommendation
We made enquiries with officers on progress inspected the
Council website and other publications. The Council has
continued to improve public access to school level inspection
and performance information, with individual school
webpages now acting as the primary access point. Education
Scotland inspection reports are directly linked where
available, alongside School Improvement Plans, Standards
and Quality Reports and School Handbooks, with clearer
signposting from central Education and Schools pages.
Some schools do not yet have inspection reports due to
inspection cycles and records management.
The Council has made good progress in implementing our
recommendation. Work is ongoing to finalise webpage layout
and present the wider service improvement framework
consistently and accessibly, with further updates planned
through 2026.
Ongoing
The recommendation is partially
implemented. The remaining work relates to
finalising webpage structure and navigation
which officers aim to be complete during
2026.
Management response:
Educational Services are on track to
complete the actions by October 2026. Work
is underway to review all school websites to
ensure they are aligned with the adapted
format and content on the Council homepage
with work planned for the summer period to
adapt the webpage layout.
Responsibleofficer: Chief Officer Education
Timescale: October 2026
Page 106

Page 107

Please adhere to these instructions when utilising this slide:
You have the flexibility to choose a colour for the background of the cover pages,
divider slides, and closing slides from the following options:
- white,
- Indigo Dye,
- True Blue,
- or any colour from the ‘Vision’ colours palettes (see slide 2).
Appendices
A: Internal control conclusions
B: Draft management representation letter
C: Draft audit report
D: Confirmation of our independence
E: Other communications
F: Wider scope ratings
G: Current year updates, forthcoming accounting & other issues
A
Page 107

Page 108

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
81
Appendix A: Internal control conclusions
Other deficiencies in internal control
A deficiency in internal control exists if:
• A control is designed, implemented, or operated in such a way that it is unable to prevent, detect, and/ or correct potential misstatements in the financial statements; or
• A control that is necessary to prevent, detect, and/ or correct misstatements in the financial statements on a timely basis is missing.
The purpose of our audit was to express an opinion on the financial statements. As part of our audit, we have considered the Council’s internal controls relevant to the preparation of the
financial statements to design audit procedures to allow us to express an opinion on the financial statements, but not for the purpose of expressing an opinion on the effectiveness of the
Council’s internal controls or to identify any significant deficiencies in their design or operation.
The matters reported in Appendix A are limited to those deficiencies and other control recommendations that we have identified during our normal audit procedures and which we
consider to be of sufficient importance to merit being reported. If we had performed more extensive procedures on internal control, we might have identified more deficiencies to report or
concluded that some of the reported deficiencies need not in fact have been reported. Our comments in Appendix A should not be regarded as a comprehensive record of all deficiencies
that may exist or improvements that could be made.
This Appendix sets out the internal control observations that we have identified as at the date of this report. These control observations are not, in our view, significant control deficiencies
but have been reported to management directly and are included in this report for your information. In our view, there is a need to address the deficiencies in internal control set out in this
section to strengthen internal control or enhance business efficiency. Our recommendations should be actioned by management in the near future.
Page 108

Page 109

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
82
Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Lease Remeasurement – Design/Implementation
Description of deficiency
Management used an incremental borrowing rate (IBR) derived from the weighted
average of existing borrowings as at May 2025 to measure right-of-use (ROU) assets
and lease liabilities as at 1 April 2024. This is not aligned with the IFRS 16 requirement
to determine an entity-specific IBR at the lease commencement date. This resulted in
trivial differences between management’s calculations and our independent
recomputation.
Potential effects
Incorrect application of the incremental borrowing rate may result in misstated lease
liabilities and ROU assets.
Recommendation
Management should ensure that the incremental borrowing rate is determined using
relevant and up-to-date information at the lease commencement date, with appropriate
review and documentation controls in place.
Management response:
The application of an incremental borrowing rate to inform the 2025/26 draft annual
accounts will be reviewed and any required adjustments made as part of the audit
process.
Responsible officer: Chief Officer Resources
Implementation date: 30 November 2026
Review of Actuarial Assumptions– Design/Implementation
Description of deficiency
The Finance Manager performs a review of the IAS 19 report prepared by the actuary to
ensure the actuarial assumptions are reasonable for financial reporting purposes. This
includes an assessment of key assumptions against PwC guidance. However, no
documentation is retained to evidence this review.
Potential effects
The Council cannot demonstrate that actuarial assumptions have been appropriately
reviewed and validated.
Recommendation
Management should implement a formal process to evidence the review of actuarial
reports, including retaining a record of review.
Management response:
The review of the IAS 19 report will be documented by the Finance Manager and
approved by the Chief Officer Resources.
Responsible officer: Chief Officer Resources
Implementation date: 31 August 2026
Page 109

Page 110

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
83
Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Privileged Accounts (Agresso) – Design/Implementation
Description of deficiency
We identified that an officer responsible for posting journals holds two separate user
accounts within Agresso, the Council’s financial reporting and accounting system.
Potential effects
The existence of multiple user accounts held by a single individual increases the risk of
unauthorised activities going undetected. This includes inappropriate system changes,
data manipulation, or misuse of information. To mitigate the risk the Council maintains
an audit log to retrospectively verify all actions taken within Agresso, ensuring that any
system access can be reviewed and confirmed.
Recommendation
Management should review:
• access permissions to ensure they are appropriate and in accordance with job
responsibilities; and
• compensating controls to ensure they appropriately mitigate the identified risk where
full segregation of duties cannot be achieved.
Management response:
Management considers the compensating controls in place mitigate the identified risk to
an acceptable level and that the officer’s access permissions are appropriate and
necessary to minimise disruption to the finance system. Removing the second user role
at this stage would create greater operational risk, as it would increase reliance on ICT
support and could lead to increased system downtime. Following the move to the new
cloud-based finance system in 2027/28, the two user profiles will no longer be required.
All users will instead have a single profile with access permissions aligned to their role.
Responsible officer: Chief Officer Resources
Implementation date: 1 April 2027
Impairment Review – Design/Implementation
Description of deficiency
The Council is unable to evidence a detailed annual review of council dwellings
enhancement expenditure to support its conclusion that this should be fully recognised
on a cost basis.
Potential effects
The value of council dwellings may be materially misstated, particularly if enhancement
expenditure between formal valuations continues to be material.
Recommendation
Management should consider more frequent valuation of its housing stock. It should
also formally evidence its annual consideration of the value added to council dwellings
by enhancement expenditure. It should consider how its valuer can support it with this
exercise.
Management response:
Consideration will be given to the costs and benefit of performing a more frequent
valuation of housing stock. This needs to find a balance between use of public money
and the extent to which the balance sheet may be misstated for a limited period. An
annual exercise will be implemented to review the accounting treatment of
enhancement expenditure.
Responsible officer: Chief Officer Resources
Implementation date: 31 March 2027
Page 110

Page 111

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
84
Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Assets with Nil Net Book Values – Design/Implementation
Description of deficiency
We identified several assets within the asset classes of other land and buildings,
industrial units, infrastructure assets and vehicles, plant and equipment that were fully
depreciated despite continuing to be used by the Council.
Potential effects
The useful lives assigned to assets may not appropriately reflect the actual usage of the
asset.
Recommendation
Officers should review the accounting policy for depreciation to ensure it is appropriate.
Management response:
The Council is in the process of implementing a new financial ledger system which will
provide an asset register as a core module. Part of this exercise will include the review
of assets transferred from the current spreadsheet-based asset register to ensure their
useful lives and net book values are appropriate. Fully depreciated assets will be
considered as part of this exercise.
Responsible officer: Chief Officer Resources
Implementation date: 1 April 2027
Expected Credit Loss (ECL) provision – Design/Implementation
Description of deficiency
We identified that there is no documented evidence to support the management’s
review of Expected Credit Loss (ECL) bad debt provisions.
Potential effects
Management do not appropriately review and challenge the judgements and
methodology for the ECL provisions, which increases the risk that debtor balances are
misstated.
Recommendation
Officers should fully document ECL reviews, including the basis for key assumptions,
and evidence of management challenge and approval.
Management response:
Approval of the bad debt provision was provided verbally by the Chief Officer Resources
in 2024/25.  In 2025/26 this has been corrected and approval has been provided in
writing.
Responsible officer: Chief Officer Resources
Implementation date: Complete
Page 111

Page 112

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
85
Appendix A: Internal control conclusions (continued)
Other recommendations in internal control
Register of Interest Review – Design/Implementation
Description of deficiency
We identified that the current procedures for compiling and reviewing the register of
elected member and senior officer interests do not sufficiently assess the relevance of
disclosures, resulting in the inclusion of outdated information.
Potential effects
The inclusion of irrelevant historic information may obscure significant current interests,
reduce the usefulness of the register, and make it more difficult for officers to identify
potential related party relationships or transactions.
Recommendation
The Council should ensure the register of interest is regularly reviewed and updated
and review the appropriateness of the guidance it provides to individuals completing
returns.
Management response:
The Council is required to retain a register of interest for elected member’s full term of
office and for 10 years after their term of office ceases. Elected members will be
reminded of the requirement to keep the register up to date.
Responsible officer: Chief Officer Regulatory and Regeneration
Implementation date: 31 July 2026
Timeliness of Bank Reconciliation Reviews – Design/Implementation
Description of deficiency
During our review of bank reconciliations, we noted that in some instances the
certification and review of reconciliations was not completed on a timely basis. We
identified three monthly bank reconciliations which were signed off two months after
they were initially prepared and a further four monthly reconciliations which were signed
off one month after preparation.
Potential effects
Delays in review increase the risk that errors, omissions, or unauthorised transactions
are not identified and corrected promptly.
Recommendation
The Council should ensure bank reconciliations are reviewed and certified on a timely
basis, with monitoring to ensure compliance and escalation where delays occur.
Management response:
The need to prioritise work due to resource pressures means there have been
occasions where the second review of bank reconciliations have not been carried out in
as timely a manner as would be preferable. However, it is important to recognise that
the performance of the reconciliations have been carried out in a timely manner.
Finance will endeavour to improve the timely performance of the second review in
2026/27.
Responsible officer: Chief Officer Resources
Implementation date: 31 July 2026
Page 112

Page 113

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
86
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points
We set out below an update on internal control points raised in prior periods.
Journals with no description
Description of deficiency
As part of our testing to address the risk of management override of controls, we obtained the Council’s complete ledger and analysed the manual entries using our data analytics
software. This included extracting any journal entries which did not have a description. We found 305 instances of journals posted without a description. This is a small proportion of
the 31,457 journals processed during the year, however we identify this as a characteristic of a high-risk journal as having no description makes it very difficult to identify what the
journal relates to and its appropriateness.
Potential effects
Descriptions on journal entries assist in understanding the nature of the entry and whether it is appropriate. The absence of descriptions increases the risk of fraud or error in the
Council’s financial records.
Recommendation
Management should ensure all journal entries include a suitable description for why the entry has been made.
2024/25 update
Ongoing: During our 2024/25 testing, we found 14 manual journals posted without a description. We extended our analysis to automated journals this year and found 200,000
automated journals posted without a description. Through discussions with officers and analysis of the ledger we were able to determine what these journals related to and that they
were appropriate.
Management response:
Automated journals are run on a daily basis and are very low risk as they are system generated without manual intervention. They predominantly allocate cash to customer
accounts. Introducing manual intervention to add descriptions would create an extreme resource pressure with no added value and introduce a risk to the process. Manual journals
with no description have reduced from 305 to 14 so there has been a clear improvement. We will continue to keep processing of manual journals under review.
Responsible officer: Chief Officer Resources
Implementation date: Ongoing
Page 113

Page 114

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
87
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points
We set out below an update on internal control points raised in prior periods.
Lease register
Description of deficiency
During our 2023/24 review of lease disclosures within the financial statements, we observed that the lease register had not been updated to reflect changes in lease agreements or
the removal of expired lease arrangements. This issue was also identified in the prior period, with management previously committing to ensure the register would be kept up to
date.
Potential effects
Failure to maintain an accurate lease register may result in incomplete or incorrect lease disclosures in the financial statements. This could lead to inaccurate financial reporting
and non-compliance with accounting standards.
Recommendation
Management should regularly review and update the lease register, ensuring that all new, modified, and expired lease agreements are accurately recorded. This process should be
embedded in the financial reporting cycle and supported by appropriate oversight to ensure the completeness and accuracy of lease disclosures.
2024/25 update
Ongoing: The agreed management target date for resolution remains 31 March 2027.
Management response:
A review will be conducted of the procedures to manage the lease register with identified improvement actions implemented. This will be carried out in conjunction with the roll out
of the new financial ledger system to enable officers to ensure we make best use of any available functionality within the new system.
Responsible officer: Chief Officer Resources
Implementation date: 31 March 2027
Page 114

Page 115

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
88
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Fixed Assets Register
Description of deficiency
The fixed asset register provided to audit did not reconcile to the non-current asset balances in the annual accounts. Over the course of the audit officers updated the register and,
although the overall difference is now trivial, it still does not fully reconcile.
Potential effects
Discrepancies between the fixed asset register and the annual accounts may result in incorrect or incomplete disclosures.
Recommendation
Officers should review and update the fixed asset register to ensure it is accurate and complete.
2024/25 update
Ongoing: The fixed asset register initially provided by officers did not reconcile to the property, plant and equipment balance in the annual accounts. Officers updated the register
during the audit, and the remaining variance is now trivial, however a full reconciliation has not yet been achieved.
The Council is progressing a project to replace its financial reporting system, including full integration of a fixed asset register, to reduce risks arising from the current spreadsheet-
based approach. The new system is expected to be implemented in the 2027/28 financial year.
Management response:
This issue has been progressed, and further improvement will be delivered through the implementation of the new financial ledger system. This will include carrying out an exercise
to ensure uploaded data reconciles to the financial statements.
Responsible officer: Chief Officer Resources
Implementation date: 31 March 2027
Page 115

Page 116

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
89
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Bank reconciliations
Description of deficiency
Our review of bank reconciliations identified a significant number of unmatched reconciling items dating back to the 2019/20 financial year. This had resulted from challenges
officers had matching transactions relating to virtual credit cards between the financial ledger and bank statements.
Potential effects
Delays in clearing reconciling items identified in bank reconciliations increases the risk of fraud and error in the financial statements.
Recommendation
Officers should work to complete the exercise to review and clear all historic transactions with the virtual credit cards.
2024/25 update
Ongoing: The issue has not yet been fully resolved. While the Council continues to address legacy unmatched transactions, we noted that new unmatched items are accumulating
through the virtual credit card process.
We also identified unmatched transactions relating to legal expenses. Officers explained that these arose following staff departures within the legal department, which delayed the
completion of reconciliations.
Management response:
Management accept this is an ongoing issue and we will continue to focus on trying to clear historic reconciling items.
Responsible officer: Chief Officer Resources
Implementation date: 31 December 2027
Page 116

Page 117

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
90
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
User Access Review
Description of deficiency
We identified that the Council is not following its policy of performing periodic review of user access to the Agresso, Financial Ledger, system. We found, at the time of testing, that
the last review was carried out in November 2021. The last comprehensive review, where managers were asked to review if system users in their team had changed post,
responsibilities or left, was carried out in 2019.
Potential effects
Unauthorised users could have inappropriate access to systems which increases the risk of data breaches and fraud.
Recommendation
The Council should ensure Agresso user accounts are reviewed on a regular basis to verify:
- that the user account is still valid (i.e. that the user account should be active);
- access rights granted to the user account are aligned with the employee's functions within the Council.
2024/25 update
Ongoing: The recommendation is still to be resolved by management.
Management response:
Management accept that regular reviews of Agresso user access are not carried out. This is due to a need to commit limited resource to areas of work where most value can be
delivered. It is further noted there are compensatory controls in place to minimise risk including segregation which means no single user can prepare an entry and approve it.
Consideration will be given to how efficiently user access reviews can be carried out when the new financial ledger system is implemented.
Responsible officer: Chief Officer Resources
Implementation date: 1 April 2027
Page 117

Page 118

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
91
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
IT System Backup management policy
Description of deficiency
We noted that, while systems are subject to backup protocols, the Council has no central backup policy.
Potential effects
The absence of clear guidance could increase the risk of data loss and impact business continuity.
Recommendation
The Council should implement a central backup policy covering:
• location of backups
• monitoring of backup jobs
• retention timelines
• testing of data restoration
• disaster recovery (including testing).
2024/25 update
Complete: The Council’s ICT Backup Policy was adopted in November 2025 and covers the areas outlined above.
Page 118

Page 119

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
92
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Review of Assets Under Construction
Description of deficiency
During our review of asset transfers we found that assets with a carrying value of £4.2 million were transferred to their appropriate operational asset classes in 2023/24 despite the
assets becoming operational in the previous financial year. This findings prompted officers to conduct a further review, resulting in the additional transfer of completed assets
totalling £5.0 million and a restatement of the prior period financial statements.
Potential effects
Incomplete recognition of operational assets leads to inaccurate financial reporting and misstatement of asset values. It also results in depreciation not being applied in line with the
Council’s accounting policy, which can affect both the accuracy of the financial statements and asset management records.
Recommendation
Management should establish a routine and timely review process for Assets Under Construction to ensure that completed assets are promptly recognised as operational and
depreciation is correctly applied.
2024/25 update
Complete: We did not identify any significant issues with the schedule of Assets Under Construction.
Page 119

Page 120

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
93
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Exit package disclosure
Description of deficiency
Our review of the exit package disclosure identified several inconsistencies with supporting employee records, including duplicate employee entries, discrepancies in employee
names across systems, and the inclusion of West Dunbartonshire Leisure Trust (WDLT) staff.
Potential effects
Inaccurate or incomplete exit package disclosures may lead to misstatements in the financial statements and incorrect reporting.
Recommendation
Management should ensure exit package data is appropriately reviewed and reconciled to data held in the HR and payroll systems.
2024/25 update
Complete: Except for one disclosure misstatement, which officers have corrected, our testing did not identify any significant consistency issues between the exit package
disclosure and supporting employee records.
Page 120

Page 121

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
94
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Non-Domestic Rates (NDR)
Description of deficiency
There was no evidence to confirm that timely and sufficient reviews are being conducted on the Non-Domestic Rates (NDR) system. This was highlighted by several errors
identified and reported during our 2023/24 certification exercise.
Potential effects
Inadequate review processes may result in undetected errors within the NDR system, potentially leading to misstatements in the Council’s financial reporting.
Recommendation
Management should implement and document a formal review process for the NDR system, ensuring that regular and robust checks are performed.
2024/25 update
Complete: We did not identify any significant issues with the NDR system. 
Page 121

Page 122

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
95
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Property, plant and equipment: Gross Internal Areas
Description of deficiency
We identified some differences between property gross internal areas per the Council’s records and those use by the external valuer in its 2023/24 valuations. We obtained
reasonable explanations for the differences and confirmed that overall, the differences would not result in the revalued properties being materially misstated individually or in total.
Potential effects
Incomplete and/or incorrect property information limits the Council’s ability to review and challenge the valuations made by its external valuer. This increases the risk of
misstatement in the annual accounts.
Recommendation
Officers should:
• Review and update the Council’s records to reflect any changes arising from capital works or operational changes.
• Work with the external valuer to ensure greater consistency in source data ahead of future valuation cycles.
• Introduce a reconciliation step during the valuation process to identify significant gross internal area variances for review.
2024/25 update
Complete: We did not identify any significant issues related to the use of gross internal areas for the properties revalued in year.
Page 122

Page 123

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
96
Appendix A: Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Creditors overstatement
Description of deficiency
We identified a number of errors in the disclosures of debtors and creditors. This had the effect of reducing both assets and liabilities by £3.222 million.
Potential effects
There is a risk that the figures in the Balance Sheet are overstated.
Recommendation
Management should review the year-end procedures to ensure that debtors and creditors are correctly accounted for.
2024/25 update
Complete: From our review of the 2024/25 schedules, we did not find similar issues with debtors and creditors.
Page 123

Page 124

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
97
Appendix B: Draft management representation letter
Forvis Mazars
100 Queen Street
Glasgow
G1 3DN
XX June 2026
Dear Tom Reid,
West Dunbartonshire Council- Audit for Year Ended 31 March 2025
This representation letter is provided in connection with your audit of the financial statements of West Dunbartonshire Council (the Council) for the year ended 31 March 2025 for the
purpose of expressing an opinion as to whether the financial statements give a true and fair view in accordance with the CIPFA/LASAAC Code of Practice on Local Authority Accounting in
the United Kingdom 2024/25 (the Code), and applicable law.
I confirm that the following representations are made on the basis of enquiries of management and staff with relevant knowledge and experience (and, where appropriate, inspection of
supporting documentation) sufficient to satisfy myself that I can properly make each of the following representations to you.
My responsibility for the financial statements and accounting information
I believe that I have fulfilled my responsibilities for the true and fair presentation and preparation of the financial statements in accordance with the Code, as amended by applicable law.
My responsibility to provide and disclose relevant information
I have provided you with:
• access to all information of which I am aware that is relevant to the preparation of the financial statements such as records, documentation and other material;
• additional information that you have requested from us for the purpose of the audit; and
• unrestricted access to individuals within the Council and Group you determined it was necessary to contact in order to obtain audit evidence.
I confirm as Chief Officer- Resources that I have taken all the necessary steps to make me aware of any relevant audit information and to establish that you, as auditors, are aware of this
information.
As far as I am aware there is no relevant audit information of which you, as auditors, are unaware.
I confirm that there is no information provided to you as part of the audit that I consider legally privileged.
Page 124

Page 125

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
98
Appendix B: Draft management representation letter (continued)
Accounting records
I confirm that all transactions that have a material effect on the financial statements have been recorded in the accounting records and are reflected in the financial statements. All other
records and related information, including minutes of all Council and committee meetings, have been made available to you.
Accounting policies
I confirm that I have reviewed the accounting policies applied during the year in accordance with International Accounting Standard 8 and consider these policies to faithfully represent the
effects of transactions, other events or conditions on the Council and Group’s financial position, financial performance and cash flows.
Accounting estimates, including those measured at fair value
I confirm that the methods, significant assumptions and the data used by the Council and Group in making the accounting estimates, including those measured at fair value, are
appropriate to achieve recognition, measurement or disclosure that is in accordance with the applicable financial reporting framework.
Contingencies
There are no material contingent losses including pending or potential litigation that should be accrued where:
• information presently available indicates that it is probable that an asset has been impaired or a liability had been incurred at the balance sheet date; and
• the amount of the loss can be reasonably estimated.
There are no material contingent losses that should be disclosed where, although either or both the conditions specified above are not met, there is a reasonable possibility that a loss, or a
loss greater than that accrued, may have been incurred at the balance sheet date.
There are no contingent gains which should be disclosed.
All material matters, including unasserted claims, that may result in litigation against the Council and Group have been brought to your attention. All known actual or possible litigation and
claims whose effects should be considered when preparing the financial statements have been disclosed to you and accounted for and disclosed in accordance with the Code, as
amended by applicable law.
Laws and regulations
I confirm that I have disclosed to you all those events of which I am aware which involve known or suspected non-compliance with laws and regulations, together with the actual or
contingent consequences which may arise therefrom.
The Council and Group has complied with all aspects of contractual agreements that would have a material effect on the accounts in the event of non-compliance.
Page 125

Page 126

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
99
Appendix B: Draft management representation letter (continued)
Fraud and error
I acknowledge my responsibility as Chief Officer- Resources for the design, implementation and maintenance of internal control to prevent and detect fraud and error and I believe I
have appropriately fulfilled those responsibilities.
I have disclosed to you:
• all the results of my assessment of the risk that the financial statements may be materially misstated as a result of fraud;
• all knowledge of fraud or suspected fraud affecting the Council and Group involving:
o management and those charged with governance;
o employees  who have significant roles in internal control; and
o others where fraud could have a material effect on the financial statements.
I have disclosed to you all information in relation to any allegations of fraud, or suspected fraud, affecting the Council and Group’s financial statements communicated by employees,
former employees, analysts, regulators or others.
Related party transactions
I confirm that all related party relationships, transactions and balances, have been appropriately accounted for and disclosed in accordance with the requirements of the Code, as
amended and applicable law.
I have disclosed to you the identity of the Council and Group’s related parties and all related party relationships and transactions of which I am aware.
Impairment review
To the best of my knowledge, there is nothing to indicate that there is a permanent reduction in the recoverable amount of the property, plant and equipment and other assets below
their carrying value at the balance sheet date. An impairment review is therefore not considered necessary.
Charges on assets
All the Council and Group's assets are free from any charges exercisable by third parties except as disclosed within the financial statements.
Future commitments
The Council and Group has no plans, intentions or commitments that may materially affect the carrying value or classification of assets and liabilities or give rise to additional
liabilities.
Page 126

Page 127

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
100
Appendix B: Draft management representation letter (continued)
Service Concession Arrangements
I am not aware of any material contract variations, payment deductions or additional service charges in 2023/24 in relation to the Council and Group’s service concession
arrangements that you have not been made aware of.
Subsequent events
I confirm all events subsequent to the date of the financial statements and for which the Code, as amended by the Code Update and applicable law, require adjustment or disclosure
have been adjusted or disclosed.
Should further material events occur after the date of this letter which may necessitate revision of the figures included in the financial statements or inclusion of a note thereto, I will
advise you accordingly.
Impacts of Russian Forces entering Ukraine
I confirm that I have carried out an assessment of the potential impact of Russian Forces entering Ukraine on the Council and Group, including the impact of mitigation measures and
uncertainties, and that the disclosure in the Annual Report and the subsequent events note 29 to the financial statements fairly reflects that assessment.
Tariffs
I confirm that I have carried out an assessment of the potential impact of changes in US trade policy in respect of tariffs, including the impact of reciprocal tariffs by other countries,
including the impact of mitigation measures and uncertainties, and that the disclosure in the Annual Report and the subsequent events note 29 to the financial statements fairly
reflects that assessment.
Going concern
To the best of my knowledge there is nothing to indicate that the Council and Group will not continue as a going concern in the foreseeable future. The period to which I have paid
particular attention in assessing the appropriateness of the going concern basis is not less than twelve months from the date of approval of the accounts.
Annual Governance Statement
I am satisfied that the Annual Governance Statement (AGS) fairly reflects the Council and Group’s risk assurance and governance framework and I confirm that I am not aware of any
significant risks that are not disclosed within the AGS.
Management Commentary
The disclosures within the Management Commentary fairly reflect my understanding of the Council and Group’s financial and operating performance over the period covered by the
financial statements.
Page 127

Page 128

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
101
Appendix B: Draft management representation letter (continued)
Unadjusted misstatements
We confirm that the effects of the uncorrected misstatements are immaterial, both individually and in aggregate, to the financial statements as a whole. A list of the uncorrected
misstatements is attached to this letter as an Appendix 1.
Wider scope and Best Value arrangements
I confirm that I have disclosed to you all findings and correspondence from regulators for previous and ongoing inspections of which I am aware. In addition, I have disclosed to you
any other information that would be considered relevant to your work on wider scope review and Best Value arrangements.
Yours faithfully,
Chief Officer- Resources
XX August 2026
Page 128

Page 129

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
102
Independent auditor’s report to the members of West Dunbartonshire Council and the Accounts Commission
Report on the audit of the financial statements
Opinion on the financial statements
We certify that we have audited the financial statements in the annual accounts of West Dunbartonshire Council and its group (“the Council”) for the year ended 31 March 2025 under
Part VII of the Local Government (Scotland) Act 1973. The financial statements comprise the group and council-only Comprehensive Income and Expenditure Statements, Balance
Sheets, Movement in Reserves Statements, Cash Flow Statements, the council-only Movement on the Housing Revenue Account Statement, the Housing Revenue Account Income
and Expenditure Statement, the Council Tax Income Account, the Non-domestic Rates Income Account, Common Good Fund, Trust Funds and notes to the financial statements,
including material accounting policy information. The financial reporting framework that has been applied in their preparation is applicable law and UK adopted international
accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2024/25 (the 2024/25 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the Council and its group as at 31 March 2025 and of its income and expenditure of the Council and its group for the year then
ended;
• have been properly prepared in accordance with UK adopted international accounting standards, as interpreted and adapted by the 2024/25 Code; and
• have been prepared in accordance with the requirements of the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local
Government in Scotland Act 2003.
Basis for opinion
We conducted our audit in accordance with applicable law and International Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. Our responsibilities under those standards are further described in the auditor’s responsibilities for the audit of the financial statements section of
our report. We were appointed by the Accounts Commission on 18 May 2022. Our period of appointment is five years, covering 2022/23 to 2026/27. We are independent of the
Council and its group in accordance with the ethical requirements that are relevant to our audit of the financial statements in the UK including the Financial Reporting Council’s Ethical
Standard, and we have fulfilled our other ethical responsibilities in accordance with these requirements. Non-audit services prohibited by the Ethical Standard were not provided to the
Council. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion. 
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the preparation of the financial statements is appropriate.
Appendix C: Draft audit report
Page 129

Page 130

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
103
Based on the work we have performed, we have not identified any material uncertainties relating to events or conditions that, individually or collectively, may cast significant doubt on
the ability of the Council and its group to continue to adopt the going concern basis of accounting for a period of at least twelve months from when the financial statements are
authorised for issue
These conclusions are not intended to, nor do they, provide assurance on the current or future financial sustainability of the Council and its group. However, we report on the Council's
arrangements for financial sustainability in a separate Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of material misstatement that we identified and our judgements thereon.
Responsibilities of the Chief Officer-Resources and the Audit Committee for the financial statements
As explained more fully in the Statement of Responsibilities, the Chief Officer- Resources is responsible for the preparation of financial statements, that give a true and fair view in
accordance with the financial reporting framework, and for such internal control as the Chief Officer- Resources determines is necessary to enable the preparation of financial
statements that are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, the Chief Officer- Resources is responsible for assessing the ability of the Council and its group to continue as a going concern, disclosing, as
applicable, matters related to going concern and using the going concern basis of accounting unless there is an intention to discontinue the operations of the Council and its group.
The Audit Committee is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue
an auditor’s report that includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs (UK) will
always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could
reasonably be expected to influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design procedures in line with our responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• using our understanding of the local government sector to identify that the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and
the Local Government in Scotland Act 2003 are significant in the context of the Council and its group;
• inquiring of the Chief Officer- Resources as to other laws or regulations that may be expected to have a fundamental effect on the operations of the Council and its group;
Appendix C: Draft audit report (Continued)
Page 130

Page 131

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
104
Appendix C: Draft audit report (continued)
• inquiring of the Chief Officer- Resources concerning the policies and procedures of the Council and its group regarding compliance with the applicable legal and regulatory framework;
• discussions among our audit team on the susceptibility of the financial statements to material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which our procedures are capable of detecting irregularities, including fraud, is affected by the inherent difficulty in detecting irregularities, the effectiveness of the Council‘s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that result from error as fraud may involve collusion, intentional omissions, misrepresentations,
or the override of internal control. The capability of the audit to detect fraud and other irregularities depends on factors such as the skilfulness of the perpetrator, the frequency and extent
of manipulation, the degree of collusion involved, the relative size of individual amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In our opinion, the audited parts of the Remuneration Report have been properly prepared in accordance
with The Local Authority Accounts (Scotland) Regulations 2014.
Other information
The Chief Officer- Resources is responsible for the other information in the annual accounts. The other information comprises the Management Commentary, Statement of
Responsibilities, Annual Governance Statement and the unaudited part of the Remuneration Report.
Our responsibility is to read all the other information and, in doing so, consider whether the other information is materially inconsistent with the financial statements or our knowledge
obtained in the course of the audit or otherwise appears to be materially misstated. If we identify such material inconsistencies or apparent material misstatements, we are required to
determine whether this gives rise to a material misstatement in the financial statements themselves. If, based on the work we have performed, we conclude that there is a material
misstatement of this other information, we are required to report that fact. We have nothing to report in this regard.
Our opinion on the financial statements does not cover the other information and we do not express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions prescribed by the Accounts Commission.
Page 131

Page 132

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
105
Appendix C: Draft audit report (continued)
Opinions prescribed by the Accounts Commission on the Management Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year for which the financial statements are prepared is consistent with the financial statements and that report
has been prepared in accordance with statutory guidance issued under the Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial year for which the financial statements are prepared is consistent with the financial statements and that
report has been prepared in accordance with the Delivering Good Governance in Local Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report are not in agreement with the accounting records; or
• we have not received all the information and explanations we require for our audit.
We have nothing to report in respect of these matters
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the wider scope responsibilities specified in the Code of Audit Practice, including those in respect of Best
Value, are set out in our Annual Audit Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, we do not undertake to have responsibilities to members or officers, in their individual capacities, or to third parties.
Tom Reid, Director
For and on behalf of Forvis Mazars LLP
100 Queen Street
Glasgow
G1 3DN
XX August 2026
Page 132

Page 133

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
106
Appendix D: Confirmation of our independence
We communicate any matters which we believe may have a bearing on the independence or the objectivity of Forvis Mazars LLP and the audit team. As part of our ongoing risk
assessment, we monitor our relationships with you to identify any new actual or perceived threats to our independence within the regulatory or professional requirements governing us as
your auditors.
We confirm that no new threats to independence have been identified since issuing our Annual Audit Plan and therefore we remain independent.
Page 133

Page 134

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
107
Appendix D: Confirmation of our independence (continued)
Fees for work as the Council’s auditor
We reported our proposed fees for the delivery of our work under the Code of Audit
Practice in our Annual Audit Plan presented to the Audit Committee on 10 December
2025. Having substantially completed our work for the 2024/25 financial year, we can
confirm that our fees are as follows:
Area of work 2024/25 fees 2023/24 fees
Auditor remuneration £276,620 £265,740
Pooled costs £6,950 £9,680
Contribution to PABV costs £64,060 £67,130
Sectoral cap adjustment (£6,220) (£7,270)
Additional fees for the audit of net defined
benefit liability/surplus.
£0 £4,208
Additional fees due to overruns TBC £7,707
Additional fees for additional work required due
to the application of accounting standard IFRS
16 (Leases). See pages 20 and 21 for details of
the audit procedures we performed.
TBC £0
Total fees £TBC £347,195
Fees for other work
We confirm that we have not undertaken any non-audit services for the Council in
the year.
Fees for audit of Charitable Trusts
The audit fee in the table does not include the cost of auditing the West
Dunbartonshire Council Charitable Trusts. Having completed our work for the
2024/25 financial year, we can confirm that our fee for this audit was £10,190
(2023/24 fees were £10,000).
Services provided by Forvis Mazars LLP associated entities or network
firms
We provide audit services to the following group entities;
• West Dunbartonshire Integration Joint Board with a total fee of £34,000
(2023/24 fee was £33,360)
• Dunbartonshire and Argyle and Bute Valuation Joint Board with a total fee of
£9,990 (2023/24 fee was £9,774).
Page 134

Page 135

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
108
Appendix E: Other communications
blank
Other
communication Response
Compliance with
Laws and
Regulations
We have not identified any significant matters involving actual or suspected non-compliance with laws and regulations.
We will obtain written representations from management that all known instances of non-compliance or suspected non-compliance with laws and
regulations whose effects should be considered when preparing financial statements have been disclosed.
External
confirmations We did not experience any issues with respect to obtaining external confirmations.
Related parties
We did not identify any significant matters relating to the audit of related parties.
We will obtain written representations from management confirming that:
a. they have disclosed to us the identity of related parties and all the related party relationships and transactions of which they are aware; and
b. they have appropriately accounted for and disclosed such relationships and transactions in accordance with the requirements of the applicable
financial reporting framework.
Going Concern
We have not identified any evidence to cause us to disagree with the Chief Officer- Resources that West Dunbartonshire Council will be a going
concern, and therefore we have not identified any evidence to cause us to consider that the use of the going concern assumption in preparation of the
financial statements is not appropriate.
We will obtain written representations from management, confirming that all relevant information covering a period of at least 12 months from the date of
approval of the financial statements has been taken into account in assessing the appropriateness of the going concern basis of preparation of the
financial statements.
Page 135

Page 136

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
109
Appendix E: Other communications (continued)
blank
Other
communication Response
Subsequent events
We are required to obtain evidence about whether events occurring between the date of the financial statements and the date of the auditor’s report that
require adjustment of, or disclosure in, the financial statements are appropriately reflected in those financial statements in accordance with the
applicable financial reporting framework.
We will obtain written representations from management that all events occurring subsequent to the date of the financial statements and for which the
applicable financial reporting framework requires adjustment or disclosure have been adjusted or disclosed.
Matters related
to fraud
Our audit was designed to obtain reasonable assurance whether the financial statements as a whole are free from material misstatement due to fraud.
Please refer to the section titled ‘Fraud considerations’ for our fraud considerations and conclusion.
We will obtain written representations from management and, where appropriate, the Audit Committee, confirming that
a. they acknowledge their responsibility for the design, implementation and maintenance of internal control to prevent and detect fraud;
b. they have disclosed to the auditor the results of management’s assessment of the risk that the financial statements may be materially misstated as a
result of fraud;
c. they have disclosed to the auditor their knowledge of fraud or suspected fraud affecting the entity involving:
i. management;
ii. employees who have significant roles in internal control; or
iii. others where the fraud could have a material effect on the financial statements; and
d. they have disclosed to the auditor their knowledge of any allegations of fraud, or suspected fraud, affecting the entity’s financial statements
communicated by employees, former employees, analysts, regulators or others.
Page 136

Page 137

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
110
Appendix E: Other communications (continued)
here
blank
Other
communication Response
System of Quality
Management
To address the requirements of ISQM (UK) 1, our firm’s System of Quality Management team completes, as part of an ongoing and iterative process, a
number of key steps to assess and conclude on our firm’s System of Quality Management, including:
• Ensuring there is an appropriate assignment of responsibilities under ISQM (UK) 1 and across Leadership
• Establishing and reviewing quality objectives each year, ensuring ISQM (UK) 1 objectives align with our firm's strategies and priorities
• Identifying, reviewing, and updating quality risks each quarter, taking into consideration a number of input sources (such as FRC / ICAEW review
findings, internal monitoring findings, findings from our firm’s root cause analysis and remediation functions, etc.)
• Identifying, designing, and implementing responses as part of the process to strengthen our firm's internal control environment and overall quality
• Evaluating responses and remediating control gaps or deficiencies
We perform an evaluation of our system of quality management on an annual basis. Our latest evaluation was performed as of 31 August 2025. Details
of that assessment and our conclusion are set out in our 2024/2025 Transparency Report, which is available on our website here.
National Fraud
Initiative
The National Fraud Initiative (NFI) in Scotland is a counter-fraud exercise led by Audit Scotland and overseen by the UK’s Cabinet Office, designed to
prevent and detect fraud. The NFI uses data analytics to compare information held on individual by different public bodies to highlight the existence of
fraud or error.
We reviewed the Council’s participation in the NFI exercise. We concluded that the NFI exercise is well integrated into Council processes. However,
resource constraint appears to limit its effectiveness in timely investigation and resolution of high risk and other matches.
Page 137

Page 138

Title position
Maximum vertical position for content
Minimum vertical position for content
Subtitle position
111
Appendix F: Wider Scope and Best Value ratings  
We need to gather sufficient evidence to support our commentary on the Council’s arrangements and to identify and report on any risks. We will carry out more detailed work where we
identify significant risks. Where significant risks are identified we will report these to the Council and make recommendations for improvement. In addition to local risks, we consider
challenges that are impacting the public sector as a whole.
We have assigned priority rankings to each of the risks identified to reflect the importance that we consider each poses to your organisation and, hence, our recommendation in terms of the
urgency of required action. The table below describes the meaning behind each rating that we have awarded to each wider scope area based on the work we have performed.
Rating Description
Level 1 The identified risk and/or significant deficiency is critical to the business
processes or the achievement of business strategic objectives. There is
potential for financial loss, damage to reputation or loss of information. The
recommendation should be taken into consideration by management
immediately.
Level 2 The identified risk and/or significant deficiency may impact on individual
objectives or business processes. The audited body should implement the
recommendation to strengthen internal controls or enhance business
efficiency. The recommendations should be actioned in the near future.
Level 3 The identified risk and/or significant deficiency is an area for improvement or
less significant. In our view, the audited body should action the
recommendation, but management do not need to prioritise.
Page 138

Page 139

Contact
Forvis Mazars
www.auditregister.org.uk
The contents of this document are confidential and not for distribution to anyone other than the recipients.
Disclosure to third parties cannot be made without the prior written consent of Forvis Mazars LLP.
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is
a limited liability partnership registered in England and Wales with registered number OC308299 and with its registered office at
30 Old Bailey, London, EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered Accountants in
England and Wales. Details about our audit registration can be viewed at www.auditregister.org.uk under reference number
C001139861. VAT number: GB 839 8356 73
© Forvis Mazars 2024. All rights reserved.
Contact
Tom Reid
Director
Tel: +44 7816 354 994
Tom.Reidl@mazars.co.uk
Page 139

Page 140

Page 140

Page 141

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
Council -   26 August 2026 
Subject: Financial Regulations Update 
1. Purpose 
1.1  The purpose of this report is to seek Members’ approval of West
Dunbartonshire Council’s (the Council) revised Financial Regulations. 
2. Recommendations 
2.1 It is recommended the Council approves the revised Financial Regulations, as
attached to this report at Appendix 1. 
3. Background 
3.1 The Council is required in terms of section 95 of The Local Government
(Scotland) Act 1973, to make arrangements for the proper administration of
its financial affairs - the Financial Regulations form part of these governance
arrangements. 
3.2 The Council’s Financial Regulations were last updated in August 2023. 
3.3 The proposed revisions are mainly to ensure the financial regulations remain
aligned to other Council governance documents and current practice. 
4. MAIN ISSUES 
4.1 The Financial Regulations have been fully reviewed and updated. The majority
of the updates are relatively minor in nature and relate to job title changes,
grammatical corrections and minor typos etc.  This cover report is not intended
to highlight these minor changes which do not materially change the
regulations, and the governance set out in them. 
4.2  There are however more significant changes which it is important to highlight.
These are highlighted in Table 1. 
ITEM 9
Page 141

Page 142

Table 1- Significant Changes to the Financial Regulations 
Regs
Ref
Previous Version Revised Version Rationale
A8 Not applicable – this is a
new provision.
A new section has been
added setting out delegated
authority to respond to
emergency situations.
Included to
provide clarity
on the
authority and
process to be
followed where
urgent
decisions are
required in an
emergency.
B2 Prepare a revised Long-
term Finance Strategy for
the Council each
financial year as part of
the estimates process
Prepare a revised Long-term
Finance Strategy for the
Council to be reviewed at
least once every three years,
with this supplemented by
updated budget forecasts
being presented to Council at
least three times a year 
Updated to
provide
flexibility in the
timing of
updates to the
Long-term
Finance
Strategy,
reflecting the
inclusion of
more regular
financial
updates within
the annual
reporting cycle.
B5 Thereafter the Council 
shall review the capital
programme and approve 
a revised programme, as
appropriate.
The Council will review and
approve the capital
programme, as required. Any
amendments to the Capital
Programme during the
financial year will be reported
to Council through the Capital
Budgetary Control Reports
with Council approval required
for any increase in capital
expenditure.
Updated to
reflect the
revised capital
approval and
reporting
arrangements
now in place.
C7(ii) Each Chief Officer shall
submit to the relevant
Service Committee on a
regular basis, a 
statement comparing
expenditure and income
with their service area
budget.
Each Chief Officer will provide 
the required information to the 
Chief Officer Resources to 
inform the regular monitoring
reports referenced at C7 (i).
Updated to more
accurately reflect 
reporting
arrangements.
M1 Council will set the budget
and determine the 
majority of the grants to 
be paid
Corporate Services Committee
will set the budget and 
determine the majority of the
grants to be paid
Updated to 
reflect the 
new process
introduced in 
Page 142

Page 143

November 2025
where grants 
are awarded on 
a 3 year basis. 
5.  PEOPLE IMPLICATIONS 
5.1  None directly from this report 
6.  FINANCIAL AND PROCUREMENT IMPLICATIONS 
6.1  There are no direct financial or procurement implications arising from this report
however implementing the proposed revisions in this report will provide greater
clarity on roles, responsibilities and procedures relating to procurement. 
7. RISK ANALYSIS 
7.1  The revisions will introduce greater clarity of procurement which will minimise
the risk of breach of procurement regulations and the risk that best value is not
being achieved. 
8. EQUALITIES IMPACT ASSESSMENT (EIA) 
8.1  There are no equalities impacts in relation to this report. 
9. CONSULTATION 
9.1  The views of relevant Chief Officers have been requested on this report and
feedback incorporated herein. 
10. STRATEGIC ASSESSMENT 
10.1  The proposed revisions to the Financial Regulations will ensure that the Council
operates best practice procurement policies and procedures which will enable
the Council to lever its spend to optimise contribution to the Council’s strategic
priorities. 
………………………………….
Laurence Slavin
Chief Officer – Resources
Date: 26 August 2026 
Person(s) to Contact:  Carol Alderson, Finance Manager  
Email: carol.alderson@west-dunbarton.gov.uk 
Appendix:
Appendix 1  Revised Finance Regulations 
Background Papers 
Page 143

Page 144

Previous reviews of Financial Regulations considered by Council in August 2023,
August 2019, October 2017, December 2016, October 2013, November 2011, June 
2011 and June 2006. 
Page 144

Page 145

Official 
WEST DUNBARTONSHIRE COUNCIL     
WEST DUNBARTONSHIRE
COUNCIL 
FINANCIAL REGULATIONS 
(Updated August 2026)
Page 145

Page 146

Official
INDEX
A.  FINANCIAL ADMINISTRATION
A1 Responsibility of the Council
A2 Best Value
A3 Section 95 Officer
A4 Depute Section 95 Officer
A5 Section 95 Officer as Adviser
A6 Chief Officers Responsible for Resources
A7 Chief Officers to consult Section 95 Officer
A8 Role of Chief Executive, Chief Officers and the Director of the
Health & Social Care Partnership (H&SCP)
B.       ESTIMATES
B1 Form of Estimates
B2 Preparation of Estimates
B3 Determination Process
B4 Report on the Estimates
B5 Long Term Capital Programme
B6 Authority to proceed with Capital Projects
B7 Updates to Capital Programmes
C.   CONTROL OF EXPENDITURE
C1 Need for Budgetary Provision
C2 Virement
C3 Updates to Capital Programmes
C4 Overspendings
C5 Report on Capital and Revenue Schemes
C6 Loan Consents
C7 Responsibility for Budgetary Control
D.        CONTROL OF INCOME
D1 Determination and Alteration of Charges
D2 Accounting Arrangements
D3 Notification of Income to Chief Officer Resources
D4 Write-Offs
D5 Benefit Overpayment
D6 Treatment of Monies Collected
D7 Forms, Books and Tickets
D8 Personal Cheques
D9 Transfers of Money
D10 Exchequer Grants
Page 146

Page 147

Official
E.                 STORES, INVENTORIES AND COSTING
E1 Costing Systems and Stores Control
E2 Custody of Stores and Stocktaking
E3 Write-Offs or Surpluses of Stores
E4 Disposal of Surplus Plant, Equipment, furnishings, materials, etc.
E5 Inventories
E6 Stock Levels
F.       BANKING, CONTROL OF CHEQUES, BORROWING, INVESTMENTS                  
AND TRUST FUNDS
F1 Arrangements with Bankers
F2 Payments into Bank
F3 Cheque Control
F4 Code of Practice for Treasury Management
F5 Treasury Policy Statement
F6 Aggregation
F7 Delegation to Section 95 Officer
F8 Investments
F9 Borrowing
F10 Deposit of Trust Funds
F11 Registrar of Bonds and Mortgages
F12 Control of Charitable Funds
F13 Reports by the Chief Officer Resouces
G.       ORDERING of  SUPPLIES, WORKS & SERVICES; AND PAYMENT OF  
ACCOUNTS
G1 Official Requisition and Orders
G2 Exemption from Official Requisition and Orders
G3 Central Purchasing and Standardisation
G4 Check on Supplies, Works and Services Undertaken
G5 Certification by Chief Officer
G6 Separation of Duties
G7 Authorised Signatures
G8 Duplicate Invoices, etc.
G9 Corporate Services (Finance) Service area Checks
G10 Amendments to Payments Vouchers
G11 Electronic Procurement
G12 Employee Code of Conduct
H.       ACCOUNTING
H1 Accounting Procedures and Records
H2 Internal Checks
Page 147

Page 148

Official
H3 Year-end Accounting Returns
H4 Year-end Final Accounts
I.         INTERNAL AUDIT
I1 Continuous Internal Audit
I2 Authority of Audit
I3 Contract Audit
I4 Business Irregularities
J.       CASH IMPREST AND PURCHASE CARDS
J1 Provision of Imprest
J2 Bank Accounts for Imprest Holders
J3 Exclusion of Income Collected
J4 Limit on Expenditure – Cash Imprest 
J5 Limit on Expenditure – Purchase Cards
J6 Statement of Account - Imprest
J7 Accounting for Purchase Card Expenditure
J8 Termination as Imprest Holder / Purchase Card Holder
J9 Insurance Cover
K.       CLAIMS FOR EXPENSES AND ALLOWANCES
K1 Arrangements for Claims
K2 Regulations for Elected Members Allowances & Expenses
K3 Submission of Claims
K4 Payment of Claims for Elected Members
K5 Certification of Claims
L.       SALARIES, WAGES AND PENSIONS
L1 Arrangements for Payments
L2 Application of National Agreements
L3 Notification
L4 Appointments
L5 Form and Certification of Records
M.      GRANTS, CONTRIBUTIONS AND SUBSCRIPTIONS TO OTHER BODIES
AND PERSONS
M1 Administration and Payment
M2 Applications
M3 Application of Section Q:  The Procurement Financial Regulations
N.       CAPITAL REVENUE AND RENEWAL FUNDS
N1 Policy for Administration
N2 Council Consideration
O.       SECURITY
Page 148

Page 149

Official
O1 Responsibility for Security
O2 Limits to Cash Holdings
O3 Safe Keys
O4 Computer Security
O5 Pre-printed/Pre-signed Cheques, Etc.
P.        INSURANCE
P1 Chief Officer Resources Responsible for Insurance
P2 Notification of Risks
P3 Notification of Claims
P4 Fidelity Guarantee Insurance
P5 Review of Insurance Cover
Q.       PROCUREMENT -  CONTRACTS FOR SUPPLIES, WORKS, AND
SERVICES
Q1 Application of these Procurement Financial Regulations
Q2 Standing Orders
Q3 Pre-requisites for Procurement
Q4 Value of Contracts
Q5 Above £50,000 Disaggregation
Q6 Contracts Governed by these Financial Regulations
Q7 Specific Exemptions to these Financial Regulations
Q8 Application of and Departure from the Requirements of these Financial    
Regulations
Q9 Procurement Responsibility for Contracts
Q10 Contract Strategy and Contract & Supplier Management
Q11 Minimum Contract Provisions
Q12 Contract Documents
Q13 Supplementary Procedures
Q14 Lists
Q15 Compliance with Public Contracts Scotland Regulations 2015 and 2016
and EU Procurement Directives (if appropriate)
Q16 Choice of EU Procurement Procedure
Q17 Advertising and Publicity for Contracts
Q18 Social Care and Other Specific Services Procurement
Q19 Restricted Procedure
Q20 Open Procedure
Q21 Negotiated Procedure With / Without Prior Publication
Q22 Competitive Procedure with Negotiation, the Competitive Dialogue
Procedure and Innovation Partnerships
Q23 Contracts Utilising Framework Agreement and Dynamic Purchasing
System 
Page 149

Page 150

Official
Q24 E-procurement
Q25 Electronic Reverse Auctions
Q26 Advanced Payments
Q27 Contract Variation
Q28 Contract Database
Q29 Reports on Procurement Matters
Q30 Payment Arrangements
Q31 Pecuniary Interest of Members or Officers
R.      COMPLIANCE OF MEMBERS AND OFFICERS
R1 Members Code
R2 Officers Code
R3 Scheme of Delegation
R4 Other Regulations
S.       OBSERVANCE OF FINANCIAL REGULATIONS
S1 Responsibility of Chief Officers
S2 Breach of Regulations
T.       REVIEW OF FINANCIAL REGULATIONS
T1 Review of Financial Regulations 
Page 150

Page 151

Official
WEST DUNBARTONSHIRE COUNCIL – FINANCIAL REGULATIONS 
A GENERAL INTERPRETATION 
The Financial Regulations set out the framework for the proper administration,
stewardship and control of West Dunbartonshire Council’s (the Council)
financial affairs. They apply to all elected members, officers, services,
committees, boards, joint arrangements, partnerships and any person or
organisation acting on behalf of the Council.  It is the duty of each Chief
Officer to ensure all employees and agents of the Council are made aware of
the Regulations and the requirement to comply with them. 
The Regulations form part of the Council’s wider governance framework and
must be read alongside the Council’s Standing Orders, Scheme of Delegation,
Anti-Fraud and Corruption arrangements, Treasury Management Strategy,
Procurement Strategy and other relevant policies and procedures. 
These Regulations are made in accordance with Section 95 of the Local
Government (Scotland) Act 1973, which requires every local authority to make
arrangements for the proper administration of its financial affairs and to ensure
the proper officer of the authority has responsibility for those affairs. 
The Chief Officer Resources has been designated as "the proper officer" and
shall be responsible for advising the Council on financial matters including the
determination of accounting policies. 
The fundamental principles of corporate governance should be reflected in all
areas of the Council business including: 
• Public funds must be used lawfully, properly, economically, efficiently and
effectively.
• Financial decisions must support Best Value, sound governance,
transparency and accountability.
• Budgets must be realistic, approved, monitored and controlled.
• Responsibility for authorising, recording, processing and reviewing
financial transactions must be clearly separated wherever practicable.
• Financial risks must be identified, assessed, managed and reported.
• All officers and members must act with integrity and avoid conflicts of
interest 
The Council has a statutory duty to secure Best Value in accordance with
the Local Government in Scotland Act 2003. This requires the Council to
make arrangements to secure continuous improvement in the performance
of its functions while maintaining an appropriate balance between quality
and cost, and having regard to economy, efficiency, effectiveness, equal
opportunities requirements and sustainable development. 
Page 151

Page 152

Official
All financial decisions, systems and procedures should support the
achievement of Best Value by ensuring resources are planned, allocated,
monitored and reviewed in a way that demonstrates sound governance,
accountability, transparency and the effective use of public funds. 
A. FINANCIAL ADMINISTRATION 
A1 Responsibility of the Council
The Council is responsible for monitoring its finances. 
A2 Elected Members
Elected members are responsible for approving the Council’s budget, policy
framework, financial strategy, treasury management arrangements and major
financial decisions in accordance with the Council’s governance
arrangements. Members must scrutinise financial performance and ensure the
Council maintains effective stewardship of public resources. 
A3 Section 95 Officer
The Section 95 Officer is the designated Officer responsible for the proper
administration of the Council’s financial affairs under section 95 of the Local
Government (Scotland) Act 1973. 
The Section 95 Officer role, undertaken by the Chief Officer Resources, is
responsible, under the general direction of the Council for the proper
administration of the Council’s financial affairs. It is the duty of the Council to
make arrangements which secure best value, including continuous
improvement in the performance of the authority’s functions. 
In addition to what is set out in these Regulations, the Section 95 Officer may
issue financial instructions to amplify or clarify these Regulations.  Other Chief
Officers may also issue financial instructions relating to the functions and
operation of their services, following consultation with the Section 95 Officer. 
A4 Depute Section 95 Officer
In the absence of the Section 95 Officer the Finance Manager will act as the
Section 95 Officer. 
A5 Section 95 Officer as Adviser
As the Council’s financial adviser, the Chief Officer Resources will report to
the Council with respect to the level of resources proposed to be utilised in
each financial year and will keep the Council and relevant Committees
informed with respect to its finances and financial performance. 
A6 Chief Officers Responsible for Resources
Chief Officers (as defined as such within the Council’s Standing Orders) and
Health and Social Care Partnership (HSCP) Heads of Service are responsible
for the security, custody and control of all resources relating to their service
areas including but not limited to buildings, plant, materials, cash and stores. 
A7 Chief Officers to Consult Section 95 Officer
Page 152

Page 153

Official
Each Chief Officer and HSCP Heads of Service must consult the Chief officer
Resources before incurring any provisional or other commitment, or before
reporting to the Council or to a committee, on any matter that is likely to have
a material impact on the Council’s finances.  Matters covered by approved
budgets are excluded from this requirement. 
The question of materiality will be the subject of consultation with the Chief
Officer Resources and, if appropriate, the Chief Executive. Any guidance
issued on materiality will form part of these Regulations. 
A8 Role of Chief Executive, Chief Officers and the Chief Officer of the Health 
& Social Care Partnership (H&SCP)
Unless otherwise stated, the title “Chief Officer” applies also to the Chief
Executive and the Chief Officer of the HSCP for the purposes of describing
their role in relation to these Regulations. 
EMERGENCY AUTHORITY
Where an emergency makes it impossible to obtain the necessary Committee
approval in terms of the Financial Regulations or Standing Orders before
committing the Council to expenditure, the following action must be taken: 
Where there is immediate danger to life or property, or a need to prevent
suffering or severe inconvenience, all necessary steps should be taken to
remove the immediate danger. Homologation of the action taken should be
obtained from the next available Committee. 
In other emergencies the Chief Executive must be advised of the following,
prior to works being carried out or any other appropriate action taken, or any
commitment being entered into: 
(a) The nature of the problem.
(b) The likely consequences of delay.
(c) Approximate costs and timescale involved.
(d) Longer term solutions (where appropriate). 
The Chief Officer Resources and the Council Leader must be advised at the
earliest opportunity of the above matters and of any action taken. In all such
cases, the Chief Executive is authorised to approve or not to approve the
proposed action. Quotes should be obtained where practicable. A retrospective
advisory report must be submitted to Committee at the earliest opportunity. 
B. ESTIMATES 
B1 Form of Estimates            
Subject to the direction of the Council, the detailed form of capital and revenue
estimates shall be determined by the Chief Officer Resources in accordance
with normal professional practice. 
B2 Preparation of Estimates 
It shall be the duty of the Chief Officer Resources to: 
Page 153

Page 154

Official
• prepare a revised Long-term Finance Strategy for the Council to be
reviewed at least once every three years, with this supplemented by
updated budget forecasts being presented to Council at least three times
a year
• prepare annual revenue and capital estimates for all services of the
Council, including such supporting information, assumptions, risks and
funding proposals as are necessary to support informed decision-
making. 
Chief Officers must provide the Chief Officer Resources, by the dates and in
the format specified, with all necessary information required to prepare the
estimates for their service areas/services, including pressures, saving
proposals, income assumptions, grant funding, service risks, workforce
implications and any other matters likely to have a financial impact. 
B3 Determination Process
Following preparation, the estimates will be collated and considered in the
guidelines as agreed by the Council. After consideration, the estimates and
any recommendations, financial assumptions, risks and supporting information
will be submitted to the Council, together with a report by the Chief Officer
Resources, for consideration in setting budgets, Council Tax and rent
increases, in line with the timelines agreed by Council. 
B4 Report on the Estimates  
The Council will consider the estimates, make any amendments it considers
appropriate, and approve the revenue budget, capital programme and
associated funding arrangements. The inclusion of items in approved revenue
or capital budgets will constitute authority to the relevant officer, in terms of the
Scheme of Delegation, to incur that expenditure. The Council will determine the
level of Council Tax and Council Housing rent levels. 
B5 Long Term Capital Programme 
A capital programme will be prepared annually by the Chief Officer Resources,
in consultation with Chief Officers and having regard to the Council’s asset
management arrangements, capital investment priorities, affordability, funding
availability and deliverability.  The programme will be submitted through the
appropriate governance route, including consideration by the Strategic Asset
Management Group and thereafter  by the Corporate Management Team,
before submission to the full Council for approval. The Council will review and
approve the capital programme, as required. Any amendments to the Capital
Programme during the financial year will be reported to Council through the
Capital Budgetary Control Reports with Council approval required for any
increase in capital expenditure. 
In preparing and approving the capital programme, the Council will have regard
to the CIPFA Prudential Code for capital finance in local authorities. The key
objectives are to ensure that capital investment plans are affordable, prudent
and sustainable; that treasury management decisions are taken in accordance
with good professional practice; that capital planning is supported by proper
business case development and option appraisal and consistent with Best
Page 154

Page 155

Official
Value. The Code sets out minimum prudential indicators which must be used
and factors that must be taken into account. 
B6 Authority to Proceed with Capital Projects
Save as provided in this Regulation B6, the inclusion of a project in the capital
programme does not itself, authorise expenditure. Standing Orders will be
applied and any required Council approval given prior to any expenditure. 
Recurring capital budgets included in the approved capital programme
may be incurred without further project-specific approval where the nature
and purpose of the expenditure have already been approved. New capital
projects or material changes to existing projects included in the capital
programme are subject to the approval of an appropriate business case
by the Strategic Asset Management Group (SAMG) before being
submitted to Council for approval, as required by the Council’s
governance arrangements. 
B7 Urgent Updates to Capital Programmes 
Where an unforeseen issue would materially alter the assumptions, cost,
funding, scope, timing or deliverability of an approved capital programme and
approval is required prior to the next appropriate Council, then the relevant
Chief Officer, following consultation with and approval by the Chief Executive,
Chief Officer Resources and the relevant Convener, may amend the
programme necessary. Any such amendment must be reported to the next
appropriate meeting of the Council and relevant Committee as part of the
usual Budgetary Control Reporting and monitoring arrangements. 
C.     CONTROL  OF  EXPENDITURE 
C1 Need for Budgetary Provision 
No expenditure may be incurred unless included in the approved annual
estimates or authorised by a supplementary estimate approved by the
Council after the submission of a report thereon.  All expenditure must be
lawful, properly authorised, supported by available resources and
consistent with the principles of Best Value. 
C2 Virement
Revenue 
Virement is the approved transfer of budget provision between subjective
headings (types of expenditure), income headings, services, service areas or
between capital projects. Virement may be exercised as outlined below: 
• Chief Officers may vire between subjective headings within a service to a
maximum of £100,000 with the approval of the Chief Officer Resources.
Any virement above £100,000 requires the approval of the Chief Officer
Resources and the relevant Committee.
Page 155

Page 156

Official
• Chief Officers may vire between services within their service areas with the
approval of the Chief Officer Resources and the relevant Committee or
Council (e.g. in a virement that affects more than one Committee).
• Chief Officers may vire between service areas only with the agreement of
all Chief Officers concerned; the approval of the Chief Officer Resources
and the relevant Committees or Council.
• All virements will be treated as permanent budget changes, i.e. carried
forward into future years, unless they are specifically highlighted as being
‘one-off’ at the time the virement is requested. 
• Head Teachers are constrained as to their powers as set out in the
Delegated Management of Resources Scheme (DMR), such virements are
not regarded as permanent. 
Capital
• Chief Officers may vire between approved capital projects up to a
maximum of £100,000 with the agreement of all Chief Officers concerned
and the approval of the Chief Officer Resources, providing the virement
does not materially alter the approved scope, funding strategy or
deliverability of the projects affected.
• Any capital virement above £100,000 requires the agreement of all
relevant Chief Officers, the approval of the Chief Officer Resources, in
consultation with the relevant Service Convener, and approval by
Council.
• A Chief Officer may exercise virement in either the revenue or capital
budget to meet any immediate need arising from an emergency, subject
to notifying the Chief Officer Resources, Chief Executive, Leader and/or
Depute Leader and relevant Service Convenor of the action taken. This
will be reported to Council or Committee in line with the Standing Orders,
Scheme of Delegation and these Financial Regulations. 
C3 Updates to Capital Programmes  
In line with regulation B7 above, such changes to the capital programme will not
constitute a virement and the process for authorisation of such a change is as
described at B7. 
C4 Overspends 
Where it appears that the approved expenditure within any service area may be
significantly exceeded or the amount of approved income may fall significantly
short of the estimate, the relevant Chief Officer must consult with the Chief
Executive and the Chief Officer Resources, and report the estimated variance,
the reason for it, the financial and service implications, and the options for
corrective action to the Council or relevant committee. 
C5 Report on Capital and Revenue Schemes 
No capital work outwith the approved capital programme, (unless agreed by
the Chief Executive as relatively minor and of an urgent nature), and no major
revenue project (even where included in the annual estimates) may commence
Page 156

Page 157

Official
unless it has been reported by the relevant Chief Officer to the Strategic Asset
Management Group where applicable for capital projects, and to the relevant
service Committee or Council for approval. 
C6 Loan Consents 
Subject to C5 above, no capital expenditure will be incurred unless the relevant
Chief Officer has confirmed that the expenditure is included within the approved
capital programme and is covered by appropriate resources. 
C7 Responsibility for Budgetary Control
(i) Chief Officer Resources:
The Chief Officer Resources is responsible for providing Chief
Officers with regular budget monitoring information, normally every
two to three months, comparing approved budgets with actual and
forecast income and expenditure for each service area. The Chief
Officer Resources will submit regular monitoring reports to the
Council and Service Committees, a statement comparing
expenditure and income with the approved budget.  Highlighting
material variances, in excess of £50,000, financial risks and
proposed corrective actions. 
(ii) Chief Officers:
Each Chief Officer is responsible for managing income and
expenditure within the approved budget for their service area and to
ensure expenditure is properly authorized, necessary, affordable
and consistent with these Financial Regulations. Each Chief Officer
will provide the required information to the Chief Officer Resources
to inform the regular monitoring reports referenced at C7 (i). 
Where it is forecast the total income or expenditure for a Service or
a capital project is likely to vary materially from the approved
budget, the relevant Chief Officer, after consultation with the Chief
Officer - Resources, will inform the Council or relevant Service
Committee and report any corrective action necessary to avoid
exceeding the budget allocation for a service or a capital project.  
D. CONTROL OF INCOME 
D1 Determination and Alteration of Charges
Charges for Supplies, Works or Services supplied by the Council must not be
introduced, varied or withdrawn without the approval of the Council (or
appropriate Service Committee where authority has been delegated), unless
an alteration is required arising from a change in legislation. 
D2 Accounting Arrangements 
The Chief Officer Resources is responsible for ensuring that financial and
accounting arrangements are in place for the proper recording of all monies
due to the Council and for the proper collection, custody, control, banking and
control of all cash received by all service areas of the Council. 
Page 157

Page 158

Official
D3 Notification of Income to Chief Officer Resources
The general expectation is that service users will pay for services provided by
the Council either in advance or at the point of delivery. Where this is not
practicable details of charges requiring to be invoiced to service users must be
promptly notified to the Chief Officer Resources in a form approved by him. All
accounts for income due to the Council shall be issued by or under
arrangements approved by the Chief Officer Resources. 
D4 Write-Offs
Individual sums due to the Council and exceeding £5,000 (excluding VAT)
must not be written-off without consideration by the appropriate service
Committee or Council. Sums up to £5,000 may be written off on the authority of
the Chief Officer Resources if satisfied that the debt cannot reasonably be
recovered. 
D5 Benefit Overpayment
An overpayment of Housing Benefit or Council Tax Reduction will be
recoverable, except when arising from a “technical error” and where the
claimant (or someone acting on their behalf) could not reasonably have been
expected to realise that an overpayment had occurred. 
D6 Treatment of Money Collected
All employees handling receipts of cash should be aware of the Council’s
Money Laundering Procedures. All funds received on behalf of the Council in
any service area and in any form shall be deposited with the Council’s bankers
in accordance with arrangements approved by the Chief Officer Resources. No
deduction may be made from such funds unless specifically authorised by the
Chief Officer Resources. 
D7 Forms, Books and Tickets
All official forms, books and tickets for the disbursement and collection of
monies, whether these are electronic-based or paper-based, shall be in a form
approved by the Chief Officer Resources. 
D8 Personal Cheques and Purchase Cards
Personal cheques must not be cashed out of the money held on behalf of the
Council. Council purchase cards must only be used for authorized Council
business and must not be used for personal purposes. 
D9 Transfers of Money
All transfers of official money from one employee to another will be evidenced
in the records of the service areas concerned and acknowledged by the
signature of the receiving officer. 
D10 Grant Funds
Chief Officers must provide the Chief Officer Resources with all information
necessary to identify, claim, record, monitor and comply with the terms and
conditions of grants due to the Council. Grant income must be used only for
the purposes for which it has been awarded, unless otherwise permitted by the
grant conditions.
Page 158

Page 159

Official  
E.      STORES, INVENTORIES AND COSTINGS 
E1 Costing Systems and Stores Control
Arrangements established by Chief Officers for costing systems, stock control
and stores management must be approved by the Chief Officer Resources. 
These arrangements must be reviewed annually by the relevant Chief Officers
to ensure they remain effective and consistent with the Council’s financial
management requirements. 
E2 Custody of Stores and Stocktaking
Each Chief Officer is responsible for the care, custody, security and control of
stores and equipment within their service area. Chief officers must ensure that
stocktaking is carried out at regular intervals as agreed with the Chief Officer
Resources, and appropriate records are maintained. 
E3 Write-Offs or Surpluses of Stock
No entries will be made, in the records, to write-off stock deficiencies or to
bring surpluses into account unless authorised by the Chief Officer Resources,
who may refer such adjustments to the Council. The Chief Officer Resources
may issue guidance, from time to time, on this subject and such guidance will
form part of these Regulations. 
E4 Disposal of Surplus Plant, Equipment, furnishings, materials, etc.
Usable surplus plant, equipment, furnishings, materials and similar items must
not be disposed of without prior consultation with the Chief Officer Resources.
Where such items are no longer required by the holding service area,
consideration must first be given to whether they can be used by another
service area. If no internal use can be identified, the items should be
advertised for sale, where appropriate. Where sale is not practicable, the items
may be offered to community groups, subject to ensuring that they are safe, fit
for purpose and disposed of in accordance with any relevant legal, financial,
procurement or asset management requirements. 
E5 Inventories
All service areas will maintain inventories of furniture, fittings, equipment
(including IT equipment), plant, machinery and other assets as determined by
the Chief Officer Resources. 
E6 Stock Levels
Stocks and stores must not be held in excess of normal requirements except in
special circumstances and with the approval of the committee concerned.
Stock levels should be reviewed regularly to ensure that holdings remain
necessary, economical and proportionate. 
F.     BANKING, CONTROL OF CHEQUES, BORROWING, INVESTMENT AND
TRUST FUNDS 
F1 Arrangements with Bankers
Page 159

Page 160

Official
All arrangements with the Council’s Bankers relating the Council’s bank
accounts must be made by, or under arrangements approved by, the Chief
Officer Resources. 
F2 Payments into Bank
All funds received on behalf of the Council must be paid into the Council’s bank
account daily or at other intervals approved by the Chief Officer Resources. 
F3 Cheque Control
All cheques must be ordered, controlled and issued on behalf of the Council
by, or under arrangements approved by, the Chief Officer Resources. 
Cheques must be signed, digitally authorised or otherwise the Chief Officer
Resources, or by another officer authorised by him to do so. 
F4 Code of Practice on Treasury Management
The Council adopts CIPFA’s “Code of Practice for Treasury Management in the
Public Services”. 
F5 Treasury Policy Statement 
The Council will approve a Treasury Management Strategy, including the
annual investment strategy and associated prudential and treasury indicators,
before the start of each financial year or as otherwise required by legislation,
statutory guidance or professional codes. 
F6 Aggregation 
All funds (other than miscellaneous balances such as imprest accounts, cash
floats and deposit receipts) in the hands of the Council shall be aggregated for
the purposes of treasury management and shall be under the control of the
Chief Officer Resources. 
F7 Delegation to Section 95 Officer 
All executive decisions on borrowing, investment or financing shall be
delegated to the Chief Officer Resources, or through him to his staff, who shall
be required to act in accordance with CIPFA’s ‘Code for Treasury Management
in Local Authorities’ and the Council’s approved Treasury Management
Strategy, treasury management practices, prudential indicators and any
relevant statutory guidance. 
F8 Investments 
All investments of funds under the Council’s control shall be made in the name
of the Council or in the names of nominees approved by the Council and
comply with the Council’s Investment Strategy, as approved by Council
annually. 
F9 Borrowing
All borrowing must be undertaken in the name of the Council and in
accordance with the Council’s approved Treasury Management Strategy,
capital financing requirements, prudential indicators and any relevant statutory
guidance. 
Page 160

Page 161

Official
F10 Deposit of Trust Funds 
All persons acting as trustees shall deposit all securities, funds, etc., relating to
the Trust with the Chief Officer Resources unless the trust deed provides
otherwise. Thereafter these funds will be invested as appropriate. 
F11 Registrar of Bonds and Mortgages 
The Chief Officer Resources shall be the Council’s registrar of stocks, local
bonds and mortgages, except where an external Registrar is appointed by the
Council. The Chief Officer Resources must maintain proper records of all
borrowing of funds undertaken by the Council. 
F12 Control of Charitable Funds
The Chief Officer Resources must ensure the proper and safe custody,
administration and control of all charitable funds held by the Council. 
Expenditure from such funds must be made only in accordance with the
relevant trust deed, charitable purpose, applicable law and any conditions
attached to the fund. 
F13 Reports by Chief Officer Resources 
The Chief Officer Resources will submit the Treasury Management Strategy,
including the annual investment strategy and associated prudential and
treasury indicators, to the Council for approval before the start of each financial
year. The Chief Officer Resources shall report (as a minimum) twice annually
to the Council on the Treasury Management operation and on the exercise of
the Treasury Management powers delegated to him. One such report shall be
a mid-year update and the other shall be the Annual Treasury management
Report for presentation by 30 September following the end of the financial year
to which it relates.  
G. ORDERING OF SUPPLIES, WORKS & SERVICES; AND PAYMENT OF
ACCOUNTS 
The Council’s Purchase to Pay Framework must be read in conjunction with
these Financial Regulations and complied with, when a contract for works,
supplies and services is being procured or paid for. 
G1 Official Requisitions and Orders 
All Supplies, Works and Services supplied to, or carried out for, the Council
shall be ordered or confirmed by means of an official requisition or order,
unless an exemption applies under G2. Official requisitions and orders must be
raised through a system approved by the Chief Officer Resources and
authorised only by officers approved by the relevant Chief Officer. Each Chief
Officer must review authorised officers regularly to ensure that access and
approval limits remain appropriate. 
G2 Exemption from Official Requisition or Order
An official requisition or order is not required for supplies of public utility
services, recurring or periodical payments (such as professional subscriptions),
petty cash purchases or point of sale corporate purchase card transactions
Page 161

Page 162

Official
such as travel expenses, sustenance, event bookings or venue reservations
where pre-payment is required. The procurement requirements of Section Q of
these Financial Regulations still apply. 
G3 Central Purchasing and Standardisation
Each requisition and order shall comply with any directions of the Council with
respect to central purchasing, approved contracts and the standardisation of
supplies, works and services. 
G4 Check on Supplies, Works and Services undertaken
Each Chief Officer must ensure that all supplies, works and services received
or undertaken are checked against the relevant requisition, order, contract or
agreement and are confirmed as satisfactory in respect of quantity, quality,
price and performance before payment is authorised. 
G5 Certification by Chief Officer 
Each Chief Officer must ensure that payment vouchers and invoices are
certified only when the following requirements have been met: 
• the Supplies, Works or Services to which the account relates have been
received, carried out, examined and approved and are in accordance
with the relevant order, contract or agreement
• the prices, extensions, calculations, trade discounts, other allowances,
credits and tax treatment are correct
• the expenditure has been properly incurred, is within approved budget
provision and complies with standing orders, the scheme of delegation,
procurement requirements and authorised expenditure limits have been
observed
• appropriate entries have been made in inventories, stores records or
asset records books where required
• the correct expenditure code, cost centre or project code are entered on
the document for payment. 
Officers who authorise payment vouchers or invoices should be familiar with
the general VAT rules of the Council as defined within the VAT Guidance and
must ensure that VAT is treated correctly. 
Once approved the voucher or invoice, must be processed through the
approved system, for payment. 
G6 Separation of Duties  
Each Chief Officer must ensure that appropriate separation of duties is
maintained between officers who raise or authorise requisitions and orders,
those who confirm receipt of goods, works or services, and those who certify
invoices for payment. Certification may be completed by an authorised officer
through a manual or electronic process, or through electronic invoice matching
within a system approved by the Chief Officer Resources.
Page 162

Page 163

Official 
G7 Authorised Signatories
The Chief Officer Resources will maintain approved records of officers
authorised to certify payment vouchers or invoices in each service area. Where
manual certification is used, specimen signatures may be required. Where
electronic systems are used, authorisation will be controlled through approved
system access, workflow and approval limits. 
G8 Duplicate Invoices, etc.
Payment will not be made from duplicate, replacement or copy invoices unless
the Chief Officer (or other officer delegated authority to do so by the Chief
Officer) confirms on the appropriate batch slip that the amounts have not been
previously paid. 
G9 Further Invoice Checking
The Chief Officer Resources shall supplement the service area checks on
payment of accounts as he considers necessary. 
G10 Amendments to Payment Vouchers 
Any amendment to a payment voucher or invoice must be clear, authorised
and supported by an audit trail. Where amendments are made manually, they
must be made in ink, initialled by the officer making the amendment and
accompanied by a brief explanation where the reason is not self-evident. 
G11 Electronic Procurement 
The above requirements apply equally to orders and payments made through
approved electronic systems including purchase cards. Each Chief Officer
must ensure that all staff using electronic approved systems comply with the
relevant authorisation levels, approval workflows, system controls and
thresholds embedded within the systems. 
G12 Employee Code of Conduct 
All employees involved in purchasing supplies, works or services must comply
with the Employee Code of Conduct and all relevant procurement policies,
procedures and guidance issued by the Procurement Manager. Officers must
also comply with guidance on gifts, hospitality and declarations of interest. 
H. ACCOUNTING 
H1 Accounting Procedures and Records
All accounting procedures, accounting records and financial systems of the
Council shall be determined by, or approved by the Chief Officer Resources.
The Council’s accounts and accounting records must be compiled by, or under
the direction of, the Chief Officer Resources in accordance with proper
accounting practice and statutory requirements. 
Page 163

Page 164

Official
H2 Internal Checks 
The provision of information about sums due to or by the Council and the
process of calculating, checking and recording these sums, shall be separated
as completely as possible from the duty of collecting, disbursing, or authorising
payment of such sums. Officers charged with the duty of examining and
checking the accounts of cash transactions shall not themselves be engaged in
any of these transactions. 
H3 Year End Accounting Returns 
Chief Officers must submit the following information to the Chief Officer
Resources  annually by the dates specified: 
• year-end inventories of stocks, stores and plant in hand at the year-end
• inventories of equipment and furnishings in hand at the appropriate date
• year-end cash imprest statements and reconciliations
• details of sums due to or by the Council and remaining unpaid at the year-
end
• any other information necessary to close the Council’s accounts at the year
end and support the completion, audit and publication of the Council’s
annual accounts.
H4 Year-End Final Accounts
Chief Officers must provide all information requested by the Chief Officer
Resources and comply with deadlines set for the completion, audit and
publication of the Council’s annual accounts. 
I.       INTERNAL AUDIT AND VALUE FOR MONEY 
I1 Continuous Internal Audit
The Internal Audit Service is a statutory assurance function that provides an
independent and objective opinion to the organisation on the adequacy and
effectiveness of the control environment. The control environment comprises
the systems of governance, risk management and internal control. The remit of
the service is to objectively examine, evaluate and report on the adequacy of
internal control as a contribution to the proper, economic, efficient and effective
use of resources throughout the Council’s activities.  A continuous internal
audit, under the independent control and direction of the Chief Officer
Resources, as described in the Council’s Internal Audit Charter and in
accordance with the Public Sector Internal Audit Standards (PSIAS), shall be
undertaken. 
I2 Authority of Audit 
The Chief Officer Resources or his authorised representatives shall have
authority to: 
• enter any Council premises or land at all reasonable times.
• have access to all records, documents, correspondence, systems and data
relating to financial and other transactions of the Council
Page 164

Page 165

Official
• require and receive explanations concerning any matter under examination
• require any employee of the Council to produce cash, stock, equipment or
any other Council property under his/her control.
All requests for information, records, files or explanations made by Internal
Audit to officers or Members shall be provided within the timescales specified
by Internal Audit. 
Further governance in relation to the provision of the Internal Audit Function is
detailed in the Internal Audit Charter which is approved by the Council’s Audit
Committee. 
I3 Contract Audit 
The Audit Manager or an authorised representatives, subject to the consent of
the Chief Officer Resources, shall have authority to engage the services of
professional persons from appropriate Council service areas to assist in the
examination of contracts under review or investigation by Internal Audit. 
I4 Business Irregularities/Disciplinary Policy
The Council’s procedure on business irregularities is contained as an
appendix in the Council’s Disciplinary Policy.  Where it is suspected or
known that business irregularities have occurred including
misappropriation or embezzlement of monies, materials etc,
fraudulent activity, misuse of Council resources or other improper
conduct, the Council Business Irregularity Procedure must be
followed. The matter must be reported immediately to the Chief Officer
Resources and the Chief Officer People and Technology, who will
contact Internal Audit for further details on how to proceed (including
determination of who will carry out any subsequent investigation).
Where any suspicion relates to maladministration the matter should
also be reported to the Council’s Monitoring Officer. 
All Chief Officers must make arrangements within their own service area to
ensure that, where it is suspected or identified that business irregularities have
or may have occurred, the matter will be reported immediately to the Chief
Officers – Resources / People and Technology. Examples of such irregularities
include but are not limited to: 
• misappropriation or embezzlement of funds, materials etc. placed in the
employee’s charge
• intentional distortion, falsification or concealment of records for any
fraudulent or improper purposes
• misuse of the Council’s ICT infrastructure including systems, data and
information.
Anonymous allegations and all categories of protected disclosure identified
within the Council’s Policy in relation to the Public Interest Disclosure Act 1998
are covered by these Regulations. 
Page 165

Page 166

Official
J. CASH IMPRESTS AND PURCHASE CARDS 
J1 Provision of Imprest 
The Chief Officer Resources may provide cash imprest accounts, cash floats
and purchase cards as he considers appropriate to officers of the Council for
the purposes of defraying petty cash and other authorised expenditure. 
J2 Bank Accounts for Imprest Holders
The Chief Officer Resources may open bank accounts for imprest holders
where it is considered appropriate and in no circumstances shall the imprest
holder overdraw the account.   It shall be a standing instruction to the Council’s
bankers that an imprest holder’s account shall not be overdrawn. Bank
accounts may not be opened or amended by any officer other than the Chief
Officer Resources, or his nominated deputes. 
J3 Exclusion of Income Collected
Income received  on behalf of the Council must not be paid into an imprest
account but must be banked or paid to the Council in accordance with these
regulations. Any bank interest earned on, or charges applied to, an imprest
account must be remitted separately and immediately to the Chief Officer
Resources and will not be left in the imprest bank balance. 
J4 Limit on Expenditure – cash imprest
Payments must be limited to minor items of expenditure and any other items
approved by the Chief Officer Resources. 
J5 Statement of Account – Imprest 
An officer responsible for an imprest account must, when requested, give to the
Chief Officer Resources a certificate of the balance on his/her imprest account
in line annual guidance issued by the Chief Officer Resources. Payments must
be supported by a receipted voucher (with appropriate VAT information as
required) where required by the Chief Officer Resources.   
J6 Limit on Expenditure – Purchase Cards
Individual officers shall have limits placed on the use of purchase cards in terms
of purpose and value of expenditure, by transaction and in total per month. 
J7 Accounting for Purchase Card Expenditure
Relevant officers must review and approve all expenditure on the online
purchase card system, in accordance with the published timetable. Payments
must be supported by a receipted voucher (with appropriate VAT information as
required) as required by the Chief Officer Resources. 
J8 Termination as Imprest Holder / Purchase Card Holder
Imprest: on leaving the employment of the Council or otherwise ceasing to be
entitled to hold an imprest advance, the officer must account to the Chief
Officer Resources for the amount advanced and return any balance in
accordance with arrangements approved by the Chief Officer Resources. 
Page 166

Page 167

Official
Purchase Cards: on leaving the employment of the Council or otherwise
ceasing to be authorised to hold a Purchase card relevant officers shall
surrender their purchase card to their line manager, who will advise Chief
Officer Resources immediately of the change to allow the card to be cancelled
and access removed. 
J9 Insurance Cover
The Chief Officer Resources will ensure that appropriate insurance cover is
obtained for all cash imprest accounts and purchase card accounts and for the
officers responsible for them, where cover is required. 
K. CLAIMS FOR EXPENSES AND ALLOWANCES 
K1 Arrangements for Claims
The Chief Officer People and Technology in consultation with the Chief Officer
Regulatory and Regeneration is responsible for making arrangements for the
administration and regulation of claims for expenses and allowances to
Members, employees of the Council and other approved bodies. 
K2 Regulations for Elected Members Allowances and Expenses
The Chief Officer Regulatory and Regeneration shall at all times make the
current regulations on expenses and allowances available to Members. 
K3 Submission of Claims
All claims for payment of travelling allowances, subsistence allowances, car
allowances and incidental expenses must be submitted via the Council’s HR
and Payroll system (or directly via payroll where system access is unavailable)
to an authorised officer (usually line manager) at regular intervals for approval.
Such payments must not be made from imprest accounts without the express
authority of the Chief Officer Resources. All such expenses shall as far as
practicable be paid through approved payroll processes, or as approved
through use of Council purchase card. 
K4 Payment of Claims for Elected Members
Payments to Members, of claims for expenses and allowances, will be made
by the Chief Officer People and Technology upon receipt of the required
information duly completed. Expense claims should be submitted no later than
three months from date of expenditure being incurred. 
K5 Certification of Claims
The certification of claims shall mean that the certifying officer is satisfied that
the journeys were authorised, the expenditure properly and necessarily
incurred and that the allowances are properly payable by the Council. 
L. SALARIES, WAGES AND PENSIONS 
L1 Arrangements for Payments 
The payment of salaries, wages, pensions, compensation and other
emoluments to all employees or former employees of the Council shall be
Page 167

Page 168

Official
made by the Chief Officer People and Technology or under arrangements
approved and controlled by them. 
L2 Application of National Agreements
The Chief Officer People and Technology is responsible for the application of
all appropriate wages and salary agreements to all employees of the Council,
elected members and relevant partner bodies (i.e. West Dunbartonshire
Leisure Trust and Dunbartonshire and Argyll and Bute Valuation Joint Board). 
L3 Notification
The Chief Officer People and Technology must be notified as soon as
possible, in an agreed form, of all matters affecting employment related
payments in particular: 
• appointments, resignations, dismissals, suspensions, secondments and
transfers
• absences from duty for sickness or other reasons, apart from approved
leave
• changes in remuneration, pay awards and agreements of general
application
• information required to maintain records of service for superannuation,
income tax and national insurance.
The Chief Officer, People & Technology will keep all Chief Officers informed
about changes in conditions of service, pension benefits and other related
matters. 
L4 Appointments
Appointments of all employees shall be made in accordance with the
regulations of the Council and the approved establishments, grades and rates
of pay. 
L5 Form and Certification of Records
Time records or other pay documents must be in a form prescribed or
approved by the Chief Officer People and Technology. Approval of pay
documents will be provided electronically through workflow procedures
established within the Council’s Workforce Management System. 
M. GRANTS, CONTRIBUTIONS AND SUBSCRIPTIONS TO OTHER BODIES
AND PERSONS 
M1 Administration and Payment
All grants (other than Common Good and Community Chest), contributions
and subscriptions must be administered through processes approved by the
Chief Officer Resources, under delegated powers, and in consultation with the
relevant Committees. 
For the Common Good Fund, Corporate Services Committee will set the
budget and determine the majority of the grants to be paid. Any remaining
Page 168

Page 169

Official
Common Good funds available for grant payment will be administered and
paid by the Chief Officer Resources in consultation with the Corporate
Services Committee, except where the Council specifies alternative
arrangements. 
Community Chest grants will be administered and paid by the West
Dunbartonshire Community Volunteer Service and reported in detail to the
Corporate Services Committee annually. 
M2 Applications
All applications for grants and subscriptions must be accompanied, where
appropriate by them applicant organisation’s accounts and any other relevant
information required to support assessment of the application. The Chief
Officer Resources may be asked to report on such information where required. 
M3 Application of section Q: Procurement Financial Regulations 
When awarding grants which may involve the delivery of Supplies, Works and
Services, due consideration must be given to the provisions of section Q of
these Financial Regulations, regardless of the source and/or nature of any
funding provided. 
M4 Real Living Wage
The Scottish Government’s default position is that, from 1 July 2023, all
Council grant recipients via Scottish Government funding will be required to
pay at least the real Living Wage and provide appropriate channels for
effective workers' voice as a minimum standard. The Council must maintain a
record of any agreed exemptions and provide updates to the Scottish
Government in the format and timescale to be advised by the Fair Work Policy
team.   
N. CAPITAL, REVENUE   AND  RENEWAL FUNDS 
N1 Policy for Administration
The Council will determine the policy on the administration and use of capital,
revenue and renewal funds. 
N2 Council Consideration 
The Council, at the consideration of the budget, shall take into account the
allocation of resources, and the approved policy for their use. 
O. SECURITY 
O1 Responsibility for Security
Each Chief Officer is responsible for maintaining appropriate security
arrangements for all buildings, stock, stores, furniture, equipment, cash,
information and other assets under their control. They must consult the Chief
Officer Resources where security arrangements are considered defective or
where special security arrangements may be required. Regular review of such
security arrangements shall be carried out by the Chief Officers. Responsibility
Page 169

Page 170

Official
for information security rests with Chief Officer Regulatory and Regeneration
and responsibility for ICT security rests with the Chief Officer People and
Transformation. 
O2 Limits to Cash Holdings
Maximum limits for cash holdings must be agreed with the Chief Officer
Resources and must not be exceeded without their express approval. 
O3 Safe Keys
Keys to safes and similar receptacles are to be securely held by those
responsible for them at all times. The loss of any such keys must be reported
immediately to the Chief Officer Resources. A register of all such key-holders
will be kept by each Chief Officer. 
O4 Computer Security 
The Chief Officer People and Technology is responsible for maintaining
appropriate security and privacy as regards information held in the Council’s
computer installations or for their use. Each Chief Officer is responsible for
ensuring that information held within their respective service area is managed
securely and in accordance with the Council’s policies and procedures.. 
O5 Pre-printed and Pre- signed Cheques, etc.
The Chief Officer Resources is responsible for ensuring that secure
arrangements exist for pre- printed/pre-signed cheques, stock certificates,
bonds and deeds and other financial documents. 
P. INSURANCE 
P1 Chief Officer Resources Responsibility for Insurance
Subject to the general supervision of the Council, the Chief Officer Resources
will arrange and maintain appropriate insurance cover for all Council activities.
They will also manage and negotiate insurance claims, in consultation with
Chief Officers, where necessary. 
P2 Notification of Risks
Chief Officers must promptly notify the Chief Officer Resources of all new or
increased risks, including changes to properties, vehicles, equipment,
activities, contracts or service delivery arrangements, and of any deletions or
reductions in risk affecting their service areas. 
P3 Notification of Claims
Chief Officers will immediately notify the Chief Officer Resources in writing of
any loss, liability or damage or any event likely to give rise to an insurance
claim. 
P4 Fidelity Guarantee Insurance
All appropriate employees of the Council will be covered by fidelity guarantee
insurance.
Page 170

Page 171

Official 
P5 Review of Insurance Cover
The Chief Officer Resources will periodically review all insurance arrangements
in consultation with the Chief Officers as appropriate, to ensure cover remains
adequate and aligned to the Council’s risk profile. 
Q. PROCUREMENT: CONTRACTS FOR SUPPLIES, WORKS AND SERVICES
(THE PROCUREMENT FINANCIAL REGULATIONS) 
Interpretive Note 
There are, throughout Section Q of the Financial Regulations, references
to EU Directives, EU Procurement Law and OJEU.  Some of these
references remain in the main regulations relating to Regulated
Procurement - the Public Contracts (Scotland) Regulations 2015. 
Therefore where they appear in the Financial Regulations, they shall be
deemed to refer to the applicable provision or requirement in terms of the
Public Contracts (Scotland) Regulations 2015.   
Q1 Application of these Procurement Financial Regulations 
Except where an explicit decision by a meeting of Council or a Committee
having delegated authority for the matter in question exists, these Financial
Regulations will apply subject to the undernoted further caveats. 
Where strict application of these Procurement Financial Regulations would be
likely to place the Council in conflict with any applicable law, the Procurement
Financial Regulations will be read with the omission of any offending provision
and in the manner which best protects the Council’s interests. 
For the avoidance of doubt, no failure to comply with these Procurement
Financial Regulations will have any negative bearing on the vires of any action
or the validity of any Contact following on such action where the action would
otherwise be within the Council's powers and the Contract would otherwise be
valid. 
Q2 Standing Orders
These Procurement Financial Regulations shall be read in conjunction with and
subject to the provisions of Parts III and Part IV of the Standing Orders relating
to Officers Delegated Powers and to Procurement, Contracts and Tendering
respectively.  No provision in these Procurement Financial Regulations will be
taken to extend or limit the vires of the Council to act in a manner which
conflicts with the natural meaning of the Standing Orders.  As provided for in
Section S of these Financial Regulations, all Officers of the Council are
required to adhere to their terms. 
In the event of any conflict between these Procurement Financial Regulations
and Standing Orders, the provisions of the Standing Orders will have
precedence. However, this provision will not have the effect of removing the
requirement to comply with these Procurement Financial Regulations simply on
the basis of that permissive provision of the Standing Orders does not specify
Page 171

Page 172

Official
any qualification or condition on its application. Where these Procurement
Financial Regulations contain provisions which qualify or place conditions on
any permission granted in any Standing Order, officers shall have regard to
such permission as so qualified or made conditional. 
Q3 Pre-requisites for Procurement
No procurement activity will commence unless, and until, each of the following
conditions have been met: 
• Sufficient budgetary provision exists (Capital, Revenue or both) in terms
of the Standing Orders and these Financial Regulations;
• Express Council, Committee or other relevant delegated authority has
been granted in accordance with Standing Orders or the Council's
Scheme of Delegation, (noting that the threshold for this approval is of
a higher value than Q6.2 below and that approval can also be sought
for subsequent delegation of approval of contract award from
committee to relevant Chief Officer where award is within original
specification and budget).
• For procurement assessed as medium to high complexity and for
procurement with a value above the thresholds in Standing Order 36.4,
(other than emergency placements for social care, or education), a
commodity / contract strategy, in a format approved and signed by the
Procurement Manager, has been agreed. 
Q4 Value of Contracts
1. In estimating the value of a contract for the purposes of these
Procurement Financial Regulations, the following direct and indirect
costs (total cost of ownership “TCO”) must be accounted for: 
a. The capital cost of the acquisition of any assets, relevant revenue
costs and one-off payments e.g. for acquisition of licenses. 
b. External training costs for training which requires to be undertaken
as a direct result of the supplies, works or services acquired under
the contract. 
c. Support services provided by or through the supplier on an ongoing
basis for the duration of the contract. Where the period of required
support is indefinite, the estimate should be based a period of 48
months. 
d. Additional third party works, supplies or services, associated with,
or necessary to support the contract and its deliverables. 
e. Annual recurring maintenance or license costs associated with the
contract and its deliverables. 
f. Disposal costs of any supplies at the end of the supplies’ useful life. 
g. The value of any works concession or service concession to the
Council. The value of a works concession or service concession
Page 172

Page 173

Official
contract is calculated by the value of the benefit to the supplier in
terms of revenue / turnover rather than the rebate coming back to
the Council. 
2. If there is any doubt regarding the appropriateness of the inclusion of
any cost in the contract value estimate, the Procurement Manager must
be consulted. 
3. For every schedule of rates contract, following discussion with the
Procurement Manager, the Chief Officer of the procuring service shall
set an indicative total value for the contract prior to procurement
documentation being issued. If there is any doubt about the anticipated
duration of the continuing supply, the Procurement Manager must base
the estimate of the value of the contract on a period of 48 months. 
Q5 Above £50,000 Disaggregation
It is not permitted to deliberately divide any procurement exercise or divide into
two or more contracts if the intention in doing so is to avoid the application of
any financial thresholds in these Procurement Financial Regulations, Standing
Orders, Domestic Law or the EU Procurement Directives (if appropriate). 
Q6 Contracts Governed by these Financial Regulations
1. In these Procurement Financial Regulations, the word “contract” will
apply to any arrangement for provision of works, supplies or services to
the Council including in so far as relevant, any framework agreement or
dynamic purchasing system; either solely or along with others, either
written or unwritten by which, legally enforceable rights and
responsibilities are created for the parties to the arrangement. 
2. Subject as undernoted, the full provisions of the Financial Regulations
following in this Section Q, will only apply to procurements having a value
of £50,000 and above. 
3. For the avoidance of doubt, individual arrangements where the primary
purpose is the supply of funding, either by or to the Council, e.g. loans,
bonds, securities, grants (other than where the Council receives works,
supplies or services or derives any benefit from them) or other financial
instruments, will not be a contract for the purposes of these Financial
Regulations, notwithstanding that some strictly limited and ancillary
provision of works, supplies or services may also be involved. 
4. Further, subject to the provisions of Domestic Legislation and case law,
no arrangement will be classed as a contract for the purposes of these
Financial Regulations, where the Council: 
a. solely or predominantly sells or acquires land or rights in land; 
b. provides works, supplies or services for third parties; 
Page 173

Page 174

Official
c. performs the functions of or delivers services to another public
body in accordance with The Local Authorities (Goods & Services)
Act 1970; 
d. receives works, supplies or services from another body where the
Council is permitted to receive them without the requirement to
tender in accordance with The Local Authorities (Goods &
Services) Act 1970; 
e. performs for or receives services from (a) an arms-length
organisation whether wholly or partly owned by the Council or (b) a
wholly owned subsidiary or group company of the Council,
provided the arrangement is compliant with Domestic Law and EU
Law (if appropriate). 
5. Notwithstanding that an arrangement may not be classed as a contract
for the purposes of these Procurement Financial Regulations under this
Section Q, the wider Financial Regulations will still apply to the
arrangement. 
Q7 Specific Exemptions to These Financial Regulations 
Notwithstanding that they may otherwise fail to be viewed as works, supplies or
services to the Council, the following shall be exempt from the scope of these
Financial Regulations any arrangement: 
a. where the Council seeks or receives legal advice, assistance or an
opinion from Junior or Senior Counsel, a Professor of Law, a
Solicitor Advocate or in the case of an opinion only, a Law Society
of Scotland Accredited Specialist solicitor recognised as having
particular expertise in the subject matter of the opinion 
b. where the Council disposes of surplus or scrap materials and
equipment previously used by the Council, except where such
disposal is, or is part of, a contract for which the Council pays (in
cash or kind) a value of £50,000 and above 
c. for the commissioning of theatrical, musical, dramatic or other
artistic performances, subject to the prior approval of the
Procurement Manager 
d. where the individual is nominated by a third party or agreed
between the parties under a Dispute Resolution Procedure within a
contract provided such nomination is compliant with Domestic and,
where appropriate EU Law. 
Q8 Application of and Departure from the Requirements of these Financial
Regulations
1. These Procurement Financial Regulations will apply to all contracts for
works, supplies and services except in the following circumstances: 
Page 174

Page 175

Official
a. Where a proviso within the Standing Orders, or the Officers
Scheme of Delegation expressly permits or requires the Chief
Executive, Chief Officer or Chief Officer to act in a manner which
may not be in accordance with these Financial Regulations, but
that only to the extent that such express permission or
requirement requires, and subject to such subsequent reporting as
such provision may require. 
b. Where a departure is expressly agreed by a meeting of Council or
the appropriate Service Committee, in advance of such departure
in these circumstances, the Procurement Manager will be
consulted before any report seeking such departure is taken to the
meeting of Council, or the appropriate Service Committee. 
c. Where in the express and written opinion of i) the Section 95
Officer, or ii) the Chief Officer Regulatory and Regeneration, the
application of the Financial Regulations would be such as to
impose a financial, reputational  or legal penalty upon the Council
or may significantly impede the Council in the performance of its
statutory duties such that it would be perverse to strictly apply
these Financial Regulations. 
d. Where the strict application of these Financial Regulations would
place the Council in conflict or mean non-compliance with the
provisions of any funding arrangement; and subject to the
Domestic Procurement Thresholds not being breached;  where
such funding, i) makes a substantial contribution to any contract
for works, supplies and services; and ii) there is no opportunity to
renegotiate the terms of any such funding within a timescale which
permits the drawdown of the funds or the performance of the
contract in accordance with its aims. However, in such
circumstances, any relevant requirements of the Domestic
Procurement Law shall be complied with. 
e. Where the Council is entitled, as a member of a consortium, or is
otherwise permitted to utilise a framework agreement, or dynamic
purchasing system; which is compliant with Domestic Law and EU
Procurement Directives (where appropriate) (the rules and
procedures of such consortium or framework agreement, or
dynamic purchasing system; will, where in conflict with these
Procurement Financial Regulations, have precedence, save
insofar as these Financial Regulations relate to internal
procedures only or insofar as they are a direct translation of any
Standing Order or aspect of the Scheme of Delegation. 
2. With the exception of those provided for within the Standing Orders and
Scheme of Delegation; and those determined by Council or Committee
such provisos will only be exercised after consultation with the
Procurement Manager and will be reported to the first appropriate
Committee where expenditure exceeds or is likely to be valued at
Page 175

Page 176

Official
at or higher than the appropriate threshold in Standing Order 36(4). 
Q9 Procurement Responsibility for Contracts 
1. The Procurement Manager is ultimately responsible for determining
whether a procurement is low / medium / high complexity.   
2. The procuring service is responsible for all low complex procurements
and works procurements below £2,000,000 where these procurements
will be directly awarded through a framework agreement in accordance
with Service Led Low Complex Procurement guidance issued by the
Procurement Manager. 
3. The Procurement Manager is responsible for all medium and high
complexity procurements and where directly awarding the procurement
through a framework agreement is not the most appropriate means of
fulfilling the requirement, the Procurement Manager shall be
responsible for low complex procurements and works procurements
with a value £50,000 or more. 
Q10 Commodity / Contract Strategy and Contract & Supplier Management
1. Where the need is identified through the commodity / contract
strategy, the Procurement Manager may require that relevant 
Chief Officer to ensure that the following provisions will be
adhered to which may include: 
a. Appointing an experienced sponsor. 
b. Establishing and maintaining a project team until the contract has
been put in place, with the right expertise which will include a
project manager, lead officer, contract owner and appropriate
representation from the Corporate Procurement Unit; Finance
Services; Legal Services and any further officers required. 
c. Defining the project stakeholders and communicating with the
stakeholders at regular intervals. 
d. Defining the required works, supplies and/or services. 
e. Developing, reviewing and finalising an options appraisal and / or
business case that shall include an analysis of cost, time,
resources, quality, risk and deliverability. 
f. Defining a clear, concise and unambiguous specification / scope. 
g. monitoring and controlling the specification / scope throughout the
procurement and contract period. 
Page 176

Page 177

Official
h. Managing the relationship between the Council and the successful
supplier. 
i. Ensuring that the Contract & Supplier Management Policy is
adhered to and that contract owners have an understanding of the
supplier contractual obligations and their own responsibilities with
regards to identifying warning signs and whistleblowing of
suspected modern slavery 
Q11 Minimum Contract Provisions
Except in circumstances where the Procurement Manager and Chief Officer
Regulatory and Regeneration agree otherwise, every contract must be: 
1. in the name of West Dunbartonshire Council 
2. in probative writing 
3. subject to the Laws of Scotland 
4. subject to the agreed exclusion or amendment of any such provisions in
terms of the Financial Regulations, Q.12 hereof, including all provisions
required by the Standing Orders or Financial Regulations, Q.11 hereof. 
Q12 Contract Documents 
1. With the exception of the specification or scope of the contract
requirements, the procurement documents in respect of all
contracts shall be prepared by the Procurement Manager in
consultation with the Chief Officer of the procuring service(s). 
The terms and conditions of the contract must be prepared in
consultation with the Chief Officer – Regulatory & Regeneration. 
2. With the exception of framework agreement call-offs; dynamic
purchasing system call-offs and emergency placements, the
Single Procurement Document (ESPD) must be used in all
procedures. 
3. The Procurement Manager may also, after consultation with the
Chief Officer – Regulatory & Regeneration as aforesaid; make
use of procurement documents prepared by the Crown
Commercial Service, Scotland Excel or the Scottish Procurement
and Commercial Service area or any other public sector body,
amended as appropriate, where permitted by those bodies to do
so. It is the Procurement Manager's responsibility to ensure that
the procurement documents are suitable for the contract. 
4. For repeat requirements and contracts which are agreed in
advance to fall within particular categories, the Procurement
Manager may dispense with consultation with the Chief Officer –
Regulatory & Regeneration, subject to their consulting in the
Page 177

Page 178

Official
event of any particularly onerous or unusual requirement arising
during the course of any procurement; and subject to any
agreed terms and conditions being reviewed annually with the
Chief Officer – Regulatory & Regeneration to ensure their
continued relevance, accuracy and fitness for purpose. 
Q13 Supplementary Procedures
The Procurement Manager may, following consultation with the Corporate
Management Team and any relevant officers, as determined by the subject
matter, issue supplementary procedural notes (“Supplementary Procedures”)
to be read in conjunction with these Procurement Financial Regulations; and
complied with when a contract for works, supplies and services is being
sought. These additional procedures will be notified to all Chief Officers who
will ensure their distribution to and compliance by all relevant employees. 
Q14 Lists 
1. The Council will not operate a list for the pre-selection of suppliers to
tender. 
2. A properly constituted framework agreement or dynamic purchasing
system, either operated by the Council or a third party, under which the
Council is legally entitled to procure, will not be classed as a List for the
purposes of these Procurement Financial Regulations. 
3. For the avoidance of doubt, the Council may retain records of recent
suppliers’ health and safety vetting to ensure that the tendering health
and safety processes remain efficient.  Such vetting must be approved
by the Procurement Manager in consultation with the Chief Officer
Regulatory and Regeneration and must not prevent any bidder from
submitting more up to date information. 
Q15 Compliance with Domestic Procurement Law and EU Procurement
Directives (if appropriate)
For Procurement Manager led procurements, where an existing framework
agreement or dynamic purchasing system is not being used, the Procurement
Manager shall include within the Contract Notice, a web link to the Public
Contracts Scotland-Tenders portal from where the electronic Invitation to
Tender, including the Single Procurement Document (SPD), can be
immediately accessed. 
Q16 Choice of Procurement Procedure
For Procurement Manager led procurements, the Procurement Manager will,
following consultation with the Chief Officer with responsibility for the proposed
contract, agree the appropriate procurement procedure to be followed, which
may include use of an existing framework agreement or dynamic purchasing
system.  The agreed procedure will be identified as part of the contract
strategy. The Procurement Manager shall ensure that the contract is
advertised, tendered, evaluated and awarded in compliance with Domestic
Page 178

Page 179

Official
Law or the EU Directives (if applicable) or the rules of the existing framework
agreement or dynamic purchasing system. 
Q17 Advertising and Publicity for Contracts 
For Procurement Manager led procurements, the Procurement Manager, must
comply with the provisions relating to advertising of contracts in Domestic
Procurement Law and the following procedures shall apply: 
1. The Council is not required to advertise contracts for social and other
specific services falling below the Domestic Procurement Threshold or
where a contract awarded usig an existing framework agreement or
dynamic purchasing system is to be used. 
2. In general such contracts will be advertised on the Public Contracts
Scotland portal.  The Procurement Manager may also authorise the
advertisement of the contract in any other appropriate way such as in
trade journals or newspapers. 
3. The Procurement Manager shall ensure that the Council’s own website
contains links to the Public Contracts Scotland portal. 
Q18 Social Care and Other Specific Services Procurement
1. For all procurement of Social Care, Education and other Specific
Services to which the Provisions of Schedule 3 (Social and Other
Specific Services) of the Public Contracts (Scotland) 2015 applies (”the
Light Touch Regime”), a direct award without competition may be made
so long as all legislative requirements are met and where appropriate
Scottish Government and COSLA guidance on the Procurement of
Care and Support Services should be followed. 
2. For service led procurements, the appropriate Chief Officer has full
authority to place Contracts up to the threshold of the Light Touch
Regime following any required consultation, provided budgetary
provision exists with no further report to Council or Committee being
required.   For Procurement Manager led procurements, the appropriate
Chief Officer will have full authority to place Contracts up to the
threshold of the Light Touch Regime following consultation with the
Procurement Manager, provided budgetary provision exists with no
further report to Council or Committee being required. 
3. Where either budgetary provision does not exist, or the limit of the Light
Touch Regime Threshold will be exceeded and where there is a need
for an  emergency placement for social care or education, and where
that means the contract needs to be put in place before the authority is
given by Council, Committee or other relevant authority then, once the
contract has been placed, a report will be sent to the next available
Council or Committee notifying the award and explaining the reason for
the placement, subject always to the overriding duty to protect the
Page 179

Page 180

Official
Personal Data and privacy of the individual or individuals in receipt of
the services. 
4. For service led procurements, the service must ensure that a notice of
Contract Award has been published in the PCS – Quick Quote portal in
accordance with Service Led Low Complex Procurement issued by the
Procurement Manager.  For Procurement Manager led procurements, 
the Procurement Manager will ensure that a notice of Contract Award
has been published in the Public Contracts Scotland portal. 
Q19 Restricted Procedure
For Procurement Manager led procurements, in accordance with the agreed
contract strategy, the Procurement Manager may approve the use of the
Restricted Procedure which shall be conducted in accordance with these
Procurement Financial Regulations. In particular: 
1. The Procurement Manager will ensure that any Contract Notice and
procurement documentation contain sufficient information to enable any
potential bidder to determine whether they are interested in bidding for
the contract; including i) the subject matter of the contract, ii) its
duration, iii) reference to selection criteria, iv) estimated
commencement date and where v) appropriate and available, its
estimated value. The notice must also specify a date and time by which
requests to be selected to tender must be received. This date and time
must be no sooner than 10 working days from the date the notice is
published and where the spend is likely to exceed the Domestic
Procurement Thresholds, no less than those timescales prescribed by
the Domestic Procurement Law. 
2. The SPD in terms agreed between the Procurement Manager and the
Chief Officer or Chief Officer of the procuring Service(s), shall be issued
by the Procurement Manager to all potential bidders responding to the
notice issued. 
3. The Procurement Manager together with officers from the procuring
service(s) and other officers with relevant input e.g. Finance and Legal
Services; will evaluate the SPD, strictly in accordance with the
established selection criteria. 
4. No bidder may be invited to tender unless they have successfully
complied with the Council’s competence, experience, capacity, financial
and health and safety checks and have met all other criteria to be
invited to tender as set out in the SPD, issued.   
5. A sufficient number of bidders must be invited to tender to ensure
genuine competition, which should not, except with the express
agreement of the Procurement Manager, be fewer than five. Where
fewer than five bidders express an interest, all those bidders meeting
the minimum selection criteria, must be invited to tender.
Page 180

Page 181

Official 
6. The Procurement Manager will be responsible for issuing the Invitation
to Tender. 
7. All Invitation to Tenders will include the final date and time for receipt of
the tenders by the Council. The Invitation to Tenders’ must also include
the award criteria weightings for the award of the contract and a
summary of the evaluation process to be used. 
8. The Procurement Manager will coordinate and respond to all tender
correspondence, queries and clarifications throughout the tender
process; including seeking input as required from the procuring service
and other relevant areas of expertise within the Council. 
9. The Procurement Manager will consider and respond to any requests
for extensions to the tender period, having regard to the terms of any
request and any input from the procuring service(s). 
10. The Procurement Manager together with officers from the procuring
service(s) will evaluate the tenders strictly in accordance with the
established award criteria. 
11. In the event of any matter being unclear to those conducting the
evaluation, the Procurement Manager will arrange for clarification or
verification of matters within any tender. In the event of such
clarification or verification revealing a matter which may be common to
one or more tenders, the Procurement Manager may, following
verification of such with those bidders as appear appropriate, determine
that the impact of any such issue on the evaluation be applied to all
those to which the matter applies. 
12. On completion of the evaluation of bids and subject to the necessary
checks and consents having been obtained, the Procurement Manager
shall close the competitive stage of the tendering process. 
13. If not previously delegated by a service committee or Council, where
the expenditure is from £213,477 for supplies and services, £663,540
for Light Touch Regime services or £2,000,000 for works (inclusive of
VAT), the Procurement Manager will submit a report to the Tendering
Committee for approval to award the contract. 
14. Subject to authority to award the contract from the Tendering
Committee, service committee or Council as appropriate, the
Procurement Manager shall advise all unsuccessful bidders in writing of
Page 181

Page 182

Official
the outcome of the tender process and may issue the Notice of
Intention to Award letter to the most economically advantageous bidder.
The Notice of Intention to Award letter shall confirm the Council’s
intention to formally award the contract subject to agreement of any
outstanding matters not conclusively addressed in terms of the tender
process. This may include any changes to terms and conditions or
commercial terms including price, deemed necessary to best deliver the
purpose of the proposed contract. Changes which materially alter
aspects of the contract such that the outcome of the tender process
may have been different; will not be permitted. 
15. Where the contract value exceeds the Domestic Procurement
Thresholds – Public Contracts (Scotland) Regulations 2015, the
Procurement Manager will implement the relevant standstill period,
including issue of the relevant standstill letters to all bidders, in
accordance with the requirements of the Domestic Procurement Law. 
16. Following conclusion of any outstanding matters with the most
economically advantageous bidder and compliance with any relevant
standstill period, the Chief Officer of the procuring service(s) may
instruct the Chief Officer Regulatory and Regeneration to enter into a
binding contract in accordance with Financial Regulations, Regulation
Q.11) - Minimum Contract Provisions. 
17. The Procurement Manager will ensure that all lawful, appropriate and
necessary feedback is delivered to unsuccessful bidders. 
18. The Procurement Manager will ensure that a Contract Award Notice is
published in the Public Contracts Scotland portal within 30 calendar
days of the Letter of Award being signed by the successful supplier(s).
Q20 Open Procedure
For Procurement Manager led procurements, in accordance with the agreed
contract strategy, the Procurement Manager may approve the use of the
single stage Open Procedure which shall be conducted in accordance with
these Procurement Financial Regulations. In particular: 
1. The Procurement Manager will ensure that any Contract Notice or
procurement documentation will state the selection criteria, award
criteria, weightings for the award of the contract, a summary of the
evaluation process and must contain sufficient information to enable
any potential suppliers to determine whether they are interested in
bidding for the contract. This should include the subject matter of the
contract, its duration, estimated commencement date and where
appropriate its estimated value. The Contract Notice or procurement
documentation must also specify a date and time by which tenders
must be received. This date and time must be no sooner than 10
Page 182

Page 183

Official
working days from the date the notice is published and where the spend
is likely to exceed the Domestic Procurement Thresholds, no less than
those timescales prescribed by the Domestic Procurement Law. 
2. The Procurement Manager shall include within the Contract Notice, a
web link to the Public Contracts Scotland-Tenders portal from where the
electronic Invitation to Tender, including the SPD, can be immediately
accessed or in exceptional circumstances e.g. where a tender is being
invited under an existing multi-supplier framework agreement, will
advise potential bidders of how procurement documentation including
an Invitation to Tender, can be obtained. 
3. The Procurement Manager together with officers from the procuring
service(s) and other officers with relevant input e.g. Finance and Legal
Services; will evaluate the SPD, strictly in accordance with the
established selection criteria. 
4. The Procurement Manager will co-ordinate and respond to all tender
correspondence, queries and clarifications throughout the tender
process; including seeking input as required from the procuring
service(s) and other relevant areas of expertise within the Council. 
5. The Procurement Manager will consider and respond to any requests
for extensions to the tender period, having regard to the terms of any
request and any input from the procuring service(s). 
6. The Procurement Manager together with officers from the procuring
service(s); will evaluate the tenders, strictly in accordance with the
established award criteria. 
7. In the event of any matter being unclear to those conducting the
evaluation, the Procurement Manager will arrange for clarification or
verification of matters within any tender. In the event of such
clarification or verification revealing a matter which may be common to
one or more tenders, the Procurement Manager may, following
verification of such with those bidders as appear appropriate, determine
that the impact of any such issue on the evaluation be applied to all
those to which the matter applies. 
8. On completion of the evaluation of bids and subject to the necessary
checks and consents having been obtained, the Procurement Manager
shall close the competitive stage of the tendering process. 
Page 183

Page 184

Official
9. If not previously delegated by a service committee or Council, where
the expenditure is from £213,477 for supplies and services, £663,540
for Light Touch Regime services or £2,000,000 for works (inclusive of
VAT), the Procurement Manager will submit a report to the Tendering
Committee for approval to award the contract. 
10. Subject to authority to award the contract from the Tendering
Committee, or if previously delegated, the Service Committee / Council,
the Procurement Manager shall advise all unsuccessful bidders in
writing of the outcome of the tender process and may issue the Notice
of Intention to Award letter to the most economically advantageous
bidder. The Notice of Intention to Award letter shall confirm the
Council’s intention to formally award the contract subject to agreement
of any outstanding matters not conclusively addressed in terms of the
tender process. This may include any changes to terms and conditions
or commercial terms, including price, deemed necessary to best deliver
the purpose of the proposed contract. Changes which materially alter
aspects of the contract such that the outcome of the tender process
may have been different; will not be permitted. 
11. Where the contract value exceeds the Domestic Procurement
Thresholds – Public Contracts (Scotland) Regulations 2015, the
Procurement Manager will implement the relevant standstill period,
including issue of the relevant standstill letters to all bidders, in
accordance with the requirements of the Domestic Procurement Law. 
12. Following conclusion of any outstanding matters with the most
economically advantageous bidder and compliance with any relevant
standstill period, the Chief Officer of the procuring service(s) may
instruct the Chief Officer Regulatory and Regeneration to enter into a
binding contract in accordance with Financial Regulations, Regulation
Q.11- Minimum Contract Provisions. 
13. The Procurement Manager will ensure that all lawful, appropriate and
necessary feedback is delivered to unsuccessful bidders. 
14. The Procurement Manager will ensure that a Contract Award Notice is
published in the Public Contracts Scotland portal within 30 calendar
days of the Letter of Award being signed by the successful supplier(s).
Q21 Negotiated Procedure With / Without Prior Publication
For Procurement Manager led procurements, in accordance with the agreed
contract strategy, the Procurement Manager may approve the use of the
Negotiated Procedure which shall be conducted in accordance with these
Financial Regulations. In particular: 
Page 184

Page 185

Official
1. Where the Domestic Procurement Law apply to a proposed contract,
the Negotiated Procedure may only be used in strict compliance with
the requirements of such Domestic Procurement Law for the use of the
Negotiated Procedure either with or without the publication of a
Contract Notice. 
2. Where the value or any other aspect of the proposed contract excludes
application of the Domestic Procurement Law – Public Contracts
(Scotland) Regulations 2015, the only grounds on which the Negotiated
Procedure (which in this context means direct negotiations with a single
supplier without competition or without further competition, with a view
to awarding a contract) may be used are: 
a. when the value of the contract is above the Domestic Procurement
Threshold for people based services 
b. where the Council is a member of a consortium, or is otherwise
permitted to utilise a framework agreement or a dynamic purchasing
system,  which permits the Negotiated Procedure 
c. where supplies or materials are proprietary articles and or services
specific to one supplier, or the an individual is recognised as the
sole, or principal  available expert witness in a judicial or quasi
judicial situation; and following due and diligent research no
reasonable satisfactory alternative supplies or services have been
located 
d. where the contract constitutes an extension of an existing contract,
provided that the extension is approved by the Council, or the
appropriate Committee or where the Council is otherwise
contractually bound to proceed with a single supplier.  The
Procurement Manager will approve the report before the report is
taken to the meeting of Council or the appropriate Committee 
e. where the contract consists of repairs to or the supply of, parts for
existing proprietary plant or machinery so as to preserve warranties
or functionality which would otherwise be lost in the event of other
parties repairing or supplying such plant or machinery  and provided
such repair or supply represents Best Value and is legally compliant 
f. where following one of the other procedures referred to in these
Procurement Financial Regulations, there has been no successful
conclusion to the Tender exercise 
g. where, were the contract otherwise subject to the Domestic
Procurement Law, such Laws would have permitted Negotiated
Procedure 
h. where following consideration of all the factors applying to the
contract, the Procurement Manager, in consultation with the Chief
Page 185

Page 186

Official
Officer Regulatory and Regeneration and such other officers as they
deem appropriate, and with the consent of the Chief Executive or
the appropriate Chief Officers, determines that the Negotiated
Procedure is manifestly in the interests of the Council and compliant
with Standing Orders and applicable law. 
3. In all such cases where the Negotiated Procedure is being followed, the
actual process adopted will ensure fairness and compliance with best
practice and a full written record of all contacts, discussions and
communications with prospective suppliers shall be kept by the
Procurement Manager. 
4. Such negotiations will be conducted in a manner that ensures that the
Council does not contract on terms that are materially less
advantageous than would be the case were another available
procedure adopted. 
5. If not previously delegated by a service committee or Council, where
the expenditure is from £213,477 for supplies and services, £663,540
for Light Touch Regime services or £2,000,000 for works (inclusive of
VAT), the Procurement Manager will submit a report to the Tendering
Committee for approval to award the contract. 
6. Subject to authority to award the contract from the Tendering
Committee or the Service Committee or Council as appropriate, the
Procurement Manager may issue a Notice of Intention to Award letter to
the bidder. The Notice of Intention to Award letter shall confirm the
Council’s intention to formally award the contract subject to agreement
of any outstanding matters not conclusively addressed in terms of the
procurement process. This may include any changes to terms and
conditions or commercial terms including price, deemed necessary to
best deliver the purpose of the proposed contract. Changes which
materially alter aspects of the contract will not be permitted. 
7. Where the contract value exceeds the Domestic Procurement
Thresholds – Public Contracts (Scotland) Regulations 2015, the
Procurement Manager will implement the relevant standstill period,
including issue of the relevant standstill letter to the bidder, in
accordance with the requirements of the Domestic Procurement Law. 
8. Following conclusion of any outstanding matters with the bidder and
compliance with any relevant standstill period, the Chief Officer of the
procuring service(s) may instruct the Chief Officer Regulatory and
Page 186

Page 187

Official
Regeneration to enter into a binding contract in accordance with
Financial Regulations, Regulation Q.11- Minimum Contract Provisions. 
9. The Procurement Manager will ensure that a Contract Award Notice is
published in the Public Contracts Scotland portal within 30 calendar
days of the Letter of Award being signed by the successful supplier. 
Q22 Competitive Procedure with Negotiation, the Competitive Dialogue
Procedure and Innovation Partnerships   
1. For Procurement Manager led procurements, the Procurement
Manager may choose to adopt the Competitive Procedure with
Negotiation or the Competitive Dialogue Procedure or an Innovation
Partnership where, in their view and in consultation with the Chief
Officer Regulatory and Regeneration, the other procedures referenced
herein will not be effective in facilitating the award of a contract. In
considering the appropriate grounds and conditions for the use of either
the Competitive Procedure with Negotiation or the Competitive Dialogue
Procedure or an innovation Partnership, the Procurement Manager will
consider amongst other matters: 
a. the available resources within and willingness of the procuring
service(s) to support such a process 
b. the extent to which dialogue with the market will assist in
developing a specification or scope, terms and overall solution
best suited to meet the Council’s needs. 
2. Where the Procurement Manager elects to use a Competitive
Procedure with Negotiation or a Competitive Dialogue Procedure or an
Innovation Partnership for a below Domestic Procurement Threshold 
contract, the principles for such procedures as set out in the Domestic
Procurement Law shall be followed insofar as reasonable and
practicable. 
3. If not previously delegated by a Service Committee or Council, where
the expenditure is from £213,477 for supplies and services, £663,540
for Light Touch Regime  services or £2,000,000 for works (inclusive of
VAT), the Procurement Manager will submit a report to the Tendering
Committee for approval to award the contract. 
4. Where the contract value exceeds the Domestic Procurement
Thresholds, the Procurement Manager will implement the relevant
standstill period, including issue of the relevant standstill letter to the
Page 187

Page 188

Official
bidder, in accordance with the requirements of the Domestic
Procurement Law. 
5. Following conclusion of any outstanding matters with the bidder and
compliance with any relevant standstill period, the Chief Officer of the
procuring service(s) may instruct the Chief Officer Regulatory and
Regeneration to enter into a binding contract in accordance with the
Financial Regulations, Regulation Q.11- Minimum Contract Provisions. 
6. The Procurement Manager will ensure that a Contract Award Notice is
published in the Public Contracts Scotland portal within 30 calendar
days of the Letter of Award being signed by the successful supplier. 
Q23 Contracts Utilising Framework Agreement and Dynamic Purchasing
System Call-offs
Subject to the Below the Light Touch Regime Threshold for Social and
Other Specific Services; or; the Restricted Procedure; or; the Open
Procedure; or; the Negotiated Procedure; being followed: 
1. For service led procurements, or in accordance with the agreed contract
strategy for Procurement Manager led procurements, both may approve
a recommendation for a contract being awarded under a framework
agreement without being required to seek further competition amongst
the suppliers on the framework agreement, in accordance with the
below noted procedure: 
a. For multiple supplier framework agreements, the framework
agreement must clearly set out how the service or the Procurement
Manager will select a supplier for direct award.  For example, by
ranking the suppliers using the original framework agreement award
criteria and selecting the highest scoring supplier who is capable of
fulfilling the contract. 
b. The invitation shall specify the closing date and time for submission
of the direct award procedure. The time limit fixed for the return shall
take into account factors such as the complexity of the subject
matter and the time needed to prepare a submission but, in any
event, shall be not less than 10 working days from the date the
invitations are issued. 
c. For service led procurements, the service will co-ordinate and
respond to all direct award correspondence, queries and
clarifications throughout the direct award process; including seeking
input as required from other relevant areas of expertise within the
Council.  For Procurement Manager led procurements, the
Procurement Manager will co-ordinate and respond to all direct
Page 188

Page 189

Official
award correspondence, queries and clarifications throughout the
direct award process; including seeking input as required from other
relevant areas of expertise within the Council. 
d. For service led procurements, the service will evaluate the direct
award response, strictly in accordance with the established award
criteria.  For Procurement led procurements, the Procurement
Manager will evaluate the direct award response, strictly in
accordance with the established award criteria. 
e. For service led procurements, in the event of any matter being
unclear to those conducting the evaluation, the service will arrange
for clarification or verification of matters within any direct award
procedure.  For Procurement Manager led procurements, in the
event of any matter being unclear to those conducting the
evaluation, the Procurement Manager will arrange for clarification or
verification of matters within any direct award procedure. 
f. For service led procurements, the service will consider and respond
to any request for an extension to the direct award period, having
regard to the terms of any request.  For Procurement Manager led
procurements, the Procurement Manager will consider and respond
to any request for an extension to the direct award period, having
regard to the terms of any request. 
g. For service led procurements, on completion of the evaluation of a
bid and subject to the necessary checks and consents having been
obtained, the service shall close the direct award process.  For
Procurement Manager led procurements, on completion of the
evaluation of a bid and subject to the necessary checks and
consents having been obtained, the Procurement Manager shall
close the direct award process.   
2. Where a framework agreement has been established but it does not lay
down all of the terms of a proposed contract including, for example,
where a new item can legitimately be added to the framework
agreement; or for a dynamic purchasing system; the Procurement
Manager may either hold a mini competition procedure under the
framework agreement or dynamic purchasing system; in accordance
with the below noted procedure: 
a. Every supplier on the framework agreement; or dynamic purchasing
system; capable of performing the contract shall be issued with an
invitation to take part in the mini competition. All invitations shall be
issued at the same time; 
Page 189

Page 190

Official
b. The invitations shall specify the closing date and time for
submission of the mini competition procedure. The time limit fixed
for the return shall take into account factors such as the complexity
of the subject matter and the time needed to prepare a submission
but, in any event, shall be not less than 10 working days from the
date the invitations are issued; 
c. The Procurement Manager will co-ordinate and respond to all mini
competition correspondence, queries and clarifications throughout
the mini competition process; including seeking input as required
from the procuring service(s) and other relevant areas of expertise
within the Council; 
d. The Procurement Manager together with officers from the procuring
service(s) will evaluate the mini competitions responses, strictly in
accordance with the established award criteria; 
e. In the event of any matter being unclear to those conducting the
evaluation, the Procurement Manager will arrange for clarification or
verification of matters within any mini competition. In the event of
such clarification or verification revealing a matter which may be
common to one or more mini competition bidders, the Procurement
Manager may, following verification of such with those mini
competition bidders as appear appropriate, determine that the
impact of any such issue on the evaluation be applied to all those to
which the matter applies; 
f. The Procurement Manager will consider and respond to any
requests for extensions to the mini competition period, having
regard to the terms of any request and any input from the procuring
service(s); 
g. On completion of the evaluation of bids and subject to the
necessary checks and consents having been obtained, the
Procurement Manager shall close the competitive stage of the mini
competition process. 
3. If not previously delegated by a service committee or Council, where
the expenditure is from £213,477 for supplies and services or £663,540
for Light Touch Regime services (inclusive of VAT), for service led
procurements, the service will submit a report to the Tendering
Committee for approval to award the contract.  Further, if not previously
delegated by a service committee or Council, where the expenditure is
from £213,477 for supplies and services, £663,540 for Light Touch
Regime services or £2,000,000 for works (inclusive of VAT), for
Page 190

Page 191

Official
Procurement Manager led procurements, the Procurement Manager in
conjunction with the service, will submit a report to the Tendering
Committee for approval to award the contract. 
4. For service led procurements, subject to authority to award the contract
from the Tendering Committee, service committee or Council where
appropriate, having been obtained, the service may issue a Notice of
Intention to Award letter to the direct award bidder. The Notice of
Intention to Award letter shall confirm the Council’s intention to formally
award the contract subject to agreement of any outstanding matters not
conclusively addressed in terms of the direct award. This may include
any changes to terms and conditions or commercial terms, including
price, deemed necessary to best deliver the purpose of the proposed
contract. Changes which materially alter aspects of the contract such
that the outcome of the direct award process may have been different;
will not be permitted. 
5. For Procurement led procurements, subject to authority to award the
contract from the Tendering Committee, service committee or Council
as appropriate, having been obtained, the Procurement Manager shall
advise all unsuccessful mini competition bidders in writing of the
outcome of the mini competition process and may issue a Notice of
Intention to Award letter to the direct award bidder or most economically
advantageous mini competition bidder. The Notice of Intention to Award
letter shall confirm the Council’s intention to formally award the contract
subject to agreement of any outstanding matters not conclusively
addressed in terms of the direct award / mini competition process. This
may include any changes to terms and conditions or commercial terms,
including price, deemed necessary to best deliver the purpose of the
proposed contract. Changes which materially alter aspects of the
contract such that the outcome of the mini competition process may
have been different; will not be permitted. 
6. For service led procurements, where the contract value exceeds the
Domestic Procurement Thresholds, the service may implement a
voluntary standstill period, including issue of the voluntary standstill
letter to the direct award bidder.  For Procurement Manager led
procurements, where the contract value exceeds the Domestic
Procurement Thresholds, the Procurement Manager may implement a
voluntary standstill period, including issue of the voluntary standstill
letters to the direct award bidder or mini competition bidders. 
7. Following conclusion of any outstanding matters with the direct award
bidder or most economically advantageous mini competition bidder, the
Page 191

Page 192

Official
Chief Officer of the procuring service(s) may instruct the Chief Officer
Regulatory and Regeneration to enter into a binding contract in
accordance with Financial Regulations, Regulation Q.11- Minimum
Contract Provisions. 
8. The Procurement Manager will ensure that all lawful, appropriate and
necessary feedback is delivered to unsuccessful mini competition
bidders. 
9. For service led procurements, the service must notify the direct award
supplier via the PCS – Quick Quote portal in accordance with Service
Led Low Complex Procurement issued by the Procurement Manager. 
For Procurement Manager led procurements, the Procurement
Manager will ensure a Contract Award Notice is published in the Public
Contracts Scotland portal within 30 calendar days of the Letter of Award
being signed by the successful supplier. 
Q24 E-procurement
E-procurement shall generally be used for contracts let by the Council
including direct awards and mini competitions where permitted unless there
are valid and substantial reasons for not doing so. In applying e-procurement
the following processes and procedures will apply:
1. Where e-procurement is to apply, no offer submitted will be considered
unless it is received via the Council's approved e-procurement system;
in the format requested and prior to the deadline for the receipt of offers
as stated by the Council in the procurement documents unless a valid
and legally competent reason for not doing so e.g. defect in the system,
has been highlighted by a bidder at or prior to the deadline for the
receipt of submissions. 
2. For service led procurements, the procuring service shall ensure that
each offer is kept unopened in a single secure electronic mailbox via
PCS Quick Quote and cannot be opened before the deadline. 
3. For Procurement Manager led procurements, the Procurement
Manager shall ensure that each offer is kept unopened in a single
secure electronic mailbox (either PCS Quick Quote or PCS Tender) that
cannot be opened before the deadline. 
4. Both the service and the Procurement Manager shall ensure that a
record is maintained showing the time and date of receipt of all
procurements. 
5. For Procurement Manager led procurements, the Procurement
Manager may authorise, in consultation with the procuring service(s),
Page 192

Page 193

Official
the extension of the deadline for the receipt of procurements in the
following circumstances: i) prior to any procurement being received by
the Council; or (ii) where, following procurements being received but
before the Council is able to open those procurements due to the
functionality of the e-procurement system, a bidder notifies a material
error in the documentation issued by the Council or the e-procurement
system, or indicates to the Council any credible and reasonable ground
it may have to challenge the Council were such an extension not
granted. In the circumstances in (ii) above, any bidder who has already
submitted a procurement shall be given the opportunity to re-submit
their procurement. 
6. For Procurement Manager led procurements, all procurements shall be
opened immediately one after the other during one session. The
bidders Technical Envelope in the e-procurement system shall be
evaluated firstly. When the bidder’s Technical Envelope has been
evaluated the Technical Envelope will be closed. The bidders
Commercial Envelope will be evaluated next.  When the bidder’s
Commercial Envelope has been evaluated the Commercial Envelope
will be closed. The Procurement Manager shall ensure that a record
showing the particulars of each procurement received and the date and
time when those tenders were opened shall be kept. 
Q25 Electronic Reverse Auctions
1. The Procurement Manager may authorise the carrying out of an
electronic reverse auction (e-auction) where they are satisfied that the
likely benefit of such will outweigh the costs and that the e- auction is in
accordance with the Domestic Procurement Law. The following
provisions will apply in the event of any e-auction: 
a. An e-auction may only be carried out where the possibility of the
use of an e-auction has been stated in the procurement
documents issued to bidders and, where the Domestic
Procurement Law applies, in the Contract Notice published in the
Public Contracts Scotland portal. 
b. Before the Procurement Manager can authorise an e-auction,
they must ensure that a full initial evaluation of tenders has been
undertaken in accordance with the award criteria set and with the
weighting fixed for them. All bidders who have submitted
admissible tenders shall be invited simultaneously by electronic
means to submit new prices and/or new values. 
Page 193

Page 194

Official
c. Throughout each phase of an e-auction the Procurement
Manager shall instantaneously communicate to all bidders
involved, at least sufficient information to enable them to
ascertain their relative rankings at any moment. The
Procurement Manager may also, at any time, announce the
number of participants in that e-auction however at all times, the
names of bidders will be kept anonymous. 
2. Any e-auction will be subject to such additional procedural requirements
as the Procurement Manager in consultation with the Chief Officer
Regulatory and Regeneration considers necessary. 
Q26 Advanced Payments
1. Advance payments to suppliers (i.e. payments made before equivalent
value is received in return) should be exceptional, and should only be
considered if a Best Value case can be made for them (e.g. a price
discount commensurate with the value of the funds in question) and if
all reasonable steps have been taken to protect public funds. 
2. Interim payments are made at a prescribed stage or at intervals during
the progress of a project. Interim payments may have an element of
prepayment. 
3. The Domestic Procurement Law which protects the right of all potential
suppliers to compete on equal terms must be complied with.  It would
not be acceptable, for example, to offer advance payments to the
successful supplier to secure a further price advantage. 
Q27 Contract Variation
1. Contract variation includes the option to increase the amount of works,
supplies or services acquired under the contract, to increase the
duration of the contract, as well as the option to increase the value of
the contract. 
2. Where a contract has been advertised in accordance with the Domestic
Procurement Law and it becomes apparent to the Chief Officer or Chief
Officer of the procuring service(s) that the value of the contract as
previously reported to the appropriate Committee is likely to be
exceeded, the Chief Officer shall consult with the Procurement Manager
for advice on what action requires to be taken. 
3. Where a contract has not been advertised under the Domestic
Procurement Law and the increase in the value of the contract is such
that the Domestic Procurement Thresholds is likely to be exceeded, no
further orders shall be made under the contract until the Chief Officer
has obtained advice from the Procurement Manager on what action
Page 194

Page 195

Official
requires to be taken save where withholding such further orders in the
interim would constitute a breach of any contractual provision or
legislative requirement. 
4. Notwithstanding Financial Regulations, 21.1.(ii).(d) – Negotiated
Procedure, in all cases, where the value of the contract exceeds the
Domestic Procurement Thresholds and the estimated net cumulative
additional cost is more than the greater of £100,000 or 25%, of which is
the greater; of the approved contract value, the Chief Officer in
consultation with the Procurement Manager, shall ensure that a report
on the matter is submitted to the next meeting of the Council or relevant
Committee where the original budget allocation was approved. 
Q28 Contract Database
1. The Procurement Manager shall maintain a register of all contracts. For
service led procurement, the procuring service(s) shall log details of the
planned contract with the Procurement Manager through populating the
contract award notice on PCS Quick Quote by providing all information
deemed necessary by the Procurement Manager to create a record of
the contract within the Contracts Database. 
2. For contracts valued at £50,000 and above, the Procurement Manager
will complete the Contracts Database. 
Q29 Reports on Procurement Matters
No report will be submitted to Council or Committee seeking to undertake a
procurement from £50,000 (exc. of VAT) or approval to award a supplies or
services contract from £213,477 (inclusive of VAT), or a Light Touch Regime
services contract from £663,540 (inclusive of VAT), or a works contract from
£2,000,000 (inclusive of VAT), unless the Procurement Manager has first been
consulted and their comments noted in the report. 
Q30 Payment Arrangements
All payment arrangements will be fully compliant with Domestic Legislation
and will be fully documented in any procurement documentation. 
Q31 Pecuniary Interest of Members or Officers 
Where a Member or officer involved in a contract has a pecuniary interest in
that contract, he/she must declare that interest and abide by the provisions of
the Ethical Standards in Public Life etc. (Scotland) Act 2000, the Councillors’
Code of Conduct and any guidance made there-under and the Council Code
of Conduct for Employees. 
Evaluation must always make sure equal treatment is undertaken in a
proportionate, objective, transparent and non-discriminatory manner. The
evaluation panel should be able to withstand any scrutiny. It is the
responsibility of all evaluation team members to complete a conflict of interest
Page 195

Page 196

Official
form prior to evaluation of each tender and to ensure that this includes any
potential conflict of interest which would prevent them from making a fair and
objective tender assessment.  For Procurement Led tenders, evaluators will
be issued this form for completion. For any department led procurements,
evaluators must make the procurement team aware of any potential conflicts. 
R.  COMPLIANCE  OF  MEMBERS  AND  OFFICERS 
R1 Members’ Code
All Members must observe and comply with the Councillor's Code of Conduct
issued by the Scottish Ministers in terms of the Ethical Standards in Public
Life etc. (Scotland) Act 2000 and any guidance made hereunder. 
R2 Officers’ Code 
All officers must observe and comply with the Council’s Code of Conduct
for Employees. 
R3 Scheme of Delegation
Officers may only exercise such functions and powers as are delegated to
them by Council or Committee or under the Scheme of Delegation. 
R4 Other Regulations
All Members and officers must comply with the undernoted regulations in
conjunction with these financial regulations: 
• Council Standing Orders including Contract Standing Orders;
• Council Treasury Management Policy Statement; and
• Member / Officer Protocol. 
S. OBSERVANCE OF FINANCIAL REGULATION 
S1 Responsibility of Chief Officers
Each Chief Officer is responsible for ensuring that these Financial
Regulations are made available to all relevant employees and other persons
within their service area, and that appropriate arrangements are in place to
support compliance. 
S2 Breach of Regulations
Any breach or non-compliance with these Financial Regulations must, on
discovery, be reported immediately to the Chief Officer Resources who will
discuss the matter with the Chief Executive and / or any other relevant Chief
Officer as appropriate in order to determine the proper action to be taken
through consideration of the following: 
• Code of Conduct for Employees and associated Guidance on offers of
gifts, hospitality and declaring Interests.
• Counter Fraud and Corruption Strategy.
• Business Irregularity procedures. 
Page 196

Page 197

Official
T. REVIEW  OF  FINANCIAL REGULATIONS 
T1 Review of the Financial Regulations
The Chief Officer Resources will review the Financial Regulations as
circumstances require, and submit any proposed amendments to Council for
approval. 
Page 197

Page 198

Page 198

Page 199

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Resources 
Council: 26 August 2026 
Subject:  Long Term Financial Strategy 
1. PURPOSE 
1.1 This report updates the Council’s long term financial strategy which was last
updated in December 2023.  
2. RECOMMENDATIONS 
2.1 Members are asked to endorse the medium to long term financial strategy for
the Council and approve the Council’s reserves and balances policy detailed
in appendix 1 to the Long-Term Financial Strategy. 
3. BACKGROUND 
3.1 Audit Scotland recommend that all councils should have long term financial
strategies in place, ideally covering five to ten years. The strategy, attached as
Appendix 1 sets out: 
 the economic and national context within which the Council operates
 medium to longer term forecasts for the revenue budget including
assumptions about key variables such as Scottish Government funding,
pay awards, inflation and cost pressures
 the Council’s council tax rate in relation to rates across Scotland 
 the position in relation to the Council’s general fund reserve 
 future revenue risks and issues 
 issues relating to financing the Council’s capital plan
 the Council’s reserves and balances policy. 
4. MAIN ISSUES 
4.1 The Council’s Long Term Financial Strategy is one of the Council’s key
strategic documents which supports the delivery of the Council’s Strategic
Plan by: 
 outlining the Council’s high level financial position over the life of the
strategy 
 planning for a sustainable revenue budget and capital investment
programme which support the Council’s key priorities
 ensuring the Council is fully aware of the financial challenges and
uncertainties that it faces and is in a strong position to continue to deliver
the best possible quality and range of services within available resources
ITEM 10
Page 199

Page 200

 increasing the wider community’s understanding of the Council’s financial
position and the challenges it is facing in balancing its budget. 
4.2 The Strategy was last approved by the Council on 20 December 2023
although it should be noted that the Council is provided with updates on
financial assumption and the future revenue budget gaps at least four times a
year through the Financial Update reports. 
4.3 The strategy provides financial estimates for the period 2027/28 to 2031/32 in
detail and also considers longer term issues beyond that five year window that
the Council needs to be sighted on. It is based on a set of assumptions and
provides a range of potential scenarios and the financial implications.
4.4 Exhibit 1 summarises the total cumulative budget gaps in the best case, mid-
range and worst case scenarios. It illustrates that, in the mid-range scenario
the Council are faced with a budget gap of £10.005m in 2027/28 rising
cumulatively to £52.161m by 2031/32.  It also shows that the cumulative 5
year gap ranges from £49.225m in the best-case scenario to £55.368m in the
worst case. 
Exhibit 1 – Estimated Budget Gaps (Cumulative) – Scenario Analysis
Scenario 2027/28 2028/29 2029/30 2030/31 2031/32
£000 £000 £000 £000 £000
Best Case 7,069 21,393 31,263 40,192 49,225
Mid-Range 10,005 24,329 34,198 43,128 52,161
Worst Case 13,212 27,536 37,406 46,335 55,368 
4.5 In addition to providing revenue projections and assumptions the Strategy also
sets out the position in relation to the economic and national context within
which the Council operates and provides information on the Council’s council
tax rate, general fund reserve, Council’s capital plan and treasury
management. 
4.6 The medium-term estimates and assumptions detailed in the Strategy will
continue to be reviewed on a regular basis and reported to the Council as part
of regular Financial Update reports. 
4.7 The Strategy also incorporates the Council’s reserves and balances policy
which Committee is asked to approve. 
5. PEOPLE IMPLICATIONS 
5.1 The strategy itself does not have any direct implications on the workforce;
however any cost reducing options generated to close the projected budget
gaps will almost certainly have implications for the workforce. 
6. FINANCIAL AND PROCUREMENT IMPLICATIONS 
6.1 The strategy does not have any direct financial implications. However, it does
Page 200

Page 201

identify in future years the Council is facing budget gaps which will require
Council decisions to mitigate. There are no direct procurement implications
arising from this report. 
7. RISK ANALYSIS 
7.1 There are a number of assumptions within the Financial Strategy, a number of
which are outwith the direct control of the Council – such as pay awards,
inflation and the Scottish Government financial settlement. These assumptions
as currently applied result in the identified budget gaps. The gaps could vary
from those indicated if the Council identifies further cost pressures or mitigates
some. 
8. EQUALITIES IMPACT ASSESSMENT (EIA) 
8.1 None directly from this report but any proposals to address the estimated
budget gap will need to consider equality issues. 
9. CONSULTATION 
9.1 The assumptions and cost pressures built into the Long-Term Financial
Strategy are considered by the Senior Management Team on an ongoing
basis and the views of Legal Services have been requested on this report. 
10. STRATEGIC ASSESSMENT 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the strategic
priorities of the Council’s Strategic Plan. 
10.2 The General Services revenue budget contributes to all categories by
providing funding in specific areas to help the Council achieve and develop
these priorities.   
Laurence Slavin
Chief Officer - Resources
Date:   26 August 2026 
Person to Contact: Laurence Slavin, Chief Officer - Resources 
E-mail: laurence.slavin@west-dunbarton.gov.uk 
Appendix 1 – West Dunbartonshire Council Long Term Financial Strategy 
Background Papers
Budget Report to Council – 4 March 2026
Financial Update Report to Council – 17 June 2026 
Page 201

Page 202

FINANCIAL STRATEGY 
August 2026 
Page 202

Page 203

Page | 2 
Table of Contents 
Section  Page
1. Introduction  3
2. Economic Context and Outlook  4 
3. Scottish Government Medium Term FInanical Strategy
and Financial Sustainability Delivery Plan 
5
4. Revenue Budget  5
5. Reserves  13
6. Revenue Outlook Beyond 5 Years – Risks and Issues  16
7. Capital Plan  16
8. Treasury Management  18
9. Housing Revenue Account  19
10. Conclusion  19
11. Appendix 1 – Policy on Reserves and Balances 21 
Page 203

Page 204

Page | 3 
1. Introduction 
1.1 West Dunbartonshire Council (the Council), like all councils, faces significant
financial challenges and is required to operate within tight fiscal constraints
for the foreseeable future due to the continuing difficult national economic
outlook and increased demand for services. This Financial Strategy (the
Strategy) recognises the Council’s duty to set a prudent, sustainable budget,
and seeks to provide a foundation for the provision of value for money in the
delivery of Council services in the longer term. 
1.2 The Strategy is an important component of the Council’s financial planning
process. It underpins the longer term sustainability of the Council. The
primary purpose of the Strategy is to ensure the Council lives within its
means, balancing expenditure against the income raised through government
grants, Non-Domestic Rates, Council Tax and fees and charges. As such the
Strategy is a key tool to help ensure that: 
• resources are deployed to facilitate delivery of the Council’s strategic
objectives with decisions on that deployment made within the
appropriate financial context
• Elected Members can take full account of the impact of decisions on
the overall financial position of the Council in the short, medium and
long term
• the Council has a comprehensive balanced budget for General
Services and the Housing Revenue Account (HRA)
• there is a clear financial planning link between Council decisions on
capital planning and the General Fund and HRA revenue budgets 
• resources are invested effectively, efficiently and on a sustainable
basis
• there is an ongoing focus on securing efficiencies across the Council
and closing our budget gaps 
• there is a clear understanding of the challenges and risks that impact
on the Council’s finances. 
1.3 The adoption of a medium to longer term approach for financial planning
enables the Council to plan the delivery of service changes across financial
years through modernising services, investing in new technology, and in
developing its strategic partnerships to provide longer term benefits. Whilst it
is hoped this approach enables required service change to be delivered in a
more planned manner and reduces the need for reactive cuts to services, that
expectation needs to be considered alongside the fact that the Council
continues to be in a period of single year settlements which doesn’t provide
any degree of financial certainly into the medium term. Furthermore  ring
fencing of funding can limit what the Council can do and additional policy and
legislative implications, not always fully funded, puts financial pressures on
councils. 
1.4 The Strategy planning approach encompasses a longer term 10 year look
forward that seeks to identify the challenges facing the Council.  There is
however, nothing to indicate that Local Government will receive a real terms
Page 204

Page 205

Page | 4 
funding boost in the medium term over and above the implementation of
Scottish Government policies and national initiatives. In this context it is likely
that Local Government in Scotland is faced with a continuing reduction in
resources which will have a clear impact on service delivery. Given the
current level of uncertainty surrounding future funding, it is therefore
considered that a strategy covering the period 2027/28 to 2031/32 in detail
with very high level estimates for 2032-2036 is reasonable and appropriate
for planning purposes. 
1.5 The Strategy makes a number of key estimates and assumptions.  These will
continue to be reviewed on a regular basis and reported to the Council  as
part of regular Financial Updates 
1.6 The inclusion of information in the Strategy does not infer approval and all
financial estimates and issues will have to be subject to approval through the
budget process. 
2 Economic Context and Outlook 
2.1 The economic health of the UK and Scotland is important context for the
Financial Strategy. Public services are effectively funded through income
from taxes which increase when the economy is performing strongly and
decrease when the economy takes a downturn. 
2.2 As in recent years, economic growth remains low. In March 2026 the Office of
Budget Responsibility published their updated economic and fiscal outlook in
which they state they expect real terms gross domestic product (GDP) growth
to slow from 1.4% in 2025 to 1.1% in 2026 before increasing to 1.6% in the
period 2027-2030.   The 1.1% forecast in 2026 is a reduction of 0.3% on the
November 2025 forecast which reflects weaker than expected GDP outturns
at the end of 2025.   
2.3 This low growth means tax receipts are not growing fast enough and as a
result there is less money available for public services. The money that is
available must be allocated between health, defence, further education, local
government and other areas. 
2.4 Over the course of 2025 the bank base rate has reduced from 4.5% in
February to 3.75% in December and the Bank of England voted to hold the
rate at 3.75% at their last meeting in April 2026. When deciding to hold it at
3.75% they specifically noted 
• the war in the Middle East disrupting transportation and supply of
energy resulting in price increases  
• inflation rising to 3.3%, higher than  predicted in February 2026 (before
the start of the war) and an expectsation it will increase further during
2026
• an expectation that energy price rises will have knock-on effects; as
businesses’ bills go up. 
Page 205

Page 206

Page | 5 
2.5 The ongoing concerns around the persistence of inflation, which is rising
faster than expected, and that higher inflation potentially becoming
embedded in consumer behaviour through higher pay claims and expected
shop price rises could make it more difficult for the Bank of England to
achieve the 2% inflation target, meaning interest rates could stay higher for
longer.  
2.6 In summary the continuing and volatile pressures experienced by local
government throughout the UK has resulted in some councils facing extreme
financial hardship and crisis. Members will already be aware that councils in
England have experienced severe financial problems leading to some
Section 151 Officers (S95 in Scotland) issuing formal S114 Notices to cease
all but essential spend.  There are inevitable questions around whether
councils experiencing significant financial pressure remain a “going concern”
and whilst this has been isolated to English councils so far, Scottish councils
are in no ways immune from it. This may lead to greater emphasis from
external auditors on the assurance and demonstration of financial
management and resilience for local authorities. 
3 Scottish Government Medium Term Financial Strategy and Financial
Sustainability Delivery Plan 
3.1 The Scottish Government’s Medium Term Financial Strategy was published
in June 2025 covering the period 2025/26 to 2030/31. It estimates a funding
gap of almost £5 billion, for both revenue and capital spending, in the period
to 2029/30. Spending requirements continue to outpace funding growth and it
is therefore inevitable that difficult decisions will need to be taken. 
3.2 Alongside the Medium Term Financial Strategy, the Scottish Government
published the Financial Sustainability Delivery Plan which sets out a number
of approaches that the Scottish Government may take to tackle the revenue
funding gap outlined in their Medium Term Financial Strategy.  This includes
a reduction in workforce of 0.5% per annum and the need for public sector
efficiencies and reform.   
4 Revenue Budget 
Aggregated External Finance Settlement 
4.1 Mainstream funding support for Local Government from the Scottish
Government is collectively known as Aggregate External Finance (AEF) and
comprises: 
• General Revenue Grant to support expenditure on all Council Services.
• A distribution of funding from the National Non-Domestic Rates Pool.
• Ring-fenced grants which must be used for specified purposes. 
4.2 Approximately 78% of the Council’s budget is supported by Aggregated
External Finance from the Scottish Government. This includes general
revenue grant, specific grants and Non Domestic Rate income. The
Page 206

Page 207

Page | 6 
remaining 22% is made up from Council Tax and other Council sources of
finance e.g. fees and charges and rental income. Consequently the Council
has limited access to levers to influence income levels. In addition the
Scottish Government currently produces single year financial settlements for
Local Government making it extremely challenging for the Council to
accurately estimate future funding levels. The breakdown of the Council’s
2026/27 budgeted revenue income is shown in Exhibit 1. 
Exhibit 1 – West Dunbartonshire Budgeted Revenue Income 
4.3 The Scottish Government Three Year Spending Review published in January
2026 outlines multi-year spending plans for various portfolios spanning from
2026/27 to 2028/29.  This is summarised in Exhibit 2  and illustrates that
Local Government funding, in cash terms, is expected to decrease slightly
over the three-year period. The real term impact of this (taking inflation into
account) is a continuing erosion of core funding for councils  as a “flat-cash”
settlement requires councils to absorb inflationary pressures and unfunded
elements of and pay awards. 
Page 207

Page 208

Page | 7 
Exhibit 2 – Summary of Scottish Government Portfolio Three Year Spending Plans
as per January 2026 Spending Review) 
Portfolio 2026/27
£m
2027/28
£m
2028/29
£m
Change
over three
year period
£m
% Change
over three
year period
Local Government 14,783 14,772 14,773 -10 -0.07%
Finance (excluding
Local Government) 421 363 365 -56 -13.30%
Health and Social
Care 21,952 22,786 23,896 1,944 8.86%
Social Justice 8,024.3 8,485.7 8,875.7 851 10.61%
Education & Skills 3,556.1 3,594.5 3,592.1 36 1.01%
Justice & Home
Affairs 4061 3,890.8 3,680.4 -381 -9.37%
Transport 3,952.4 4,053.2 4,335.1 383 9.68%
Deputy First
Minister, Economy
and Gaelic
1,362.3 1,342.9 1,264.2 -98 -7.20%
Housing 1,205.3 1,272.7 1,370.0 165 13.66%
Rural Affairs, Land
Reform & Islands 1,111.4 1,116.9 1,128.7 17 1.56%
Climate Action and
Energy 435.8 434.8 433.4 -2 -0.55%
Constitution, Eternal
Affairs & Culture 397.5 445.9 437.8 40 10.14%
Crown Office &
Procurator Fiscal
Service
248.6 246.8 245.3 -3 -1.33%
Scottish Parliament
and Audit Scotland 166 163 168 2 1.20%
Total Scotland 61,677 62,968 64,565 2,888 4.68% 
4.4 The Scottish Government has historically provided one year funding
settlements to Local Authorities which has impacted on the ability to plan over
the longer term with certainty. Single year settlements from Scottish
Government have required the Council to make assumptions in the revenue
plan from years 2-5 and plan on that basis. For financial year 2026/27
another one year settlement was provided in January 2026  however the
spending review summarised in exhibit 2 provides an indication of future
funding levels without being definitive. 
4.5 Looking forward, the direcition of travel for funding as set out in the Scottish
Government Spending Review pressures being experienced at a Scotland
and UK wide level, drive a broad expectation that resources for local
government services will continue to be constrained for the foreseeable
future. Each 1% deviation from a flat cash position settlement accounts for
Page 208

Page 209

Page | 8 
around £2.7m of movement in funding. A robust multi-year funding settlement
from Scottish Government including clarification on ring-fencing of funding
remains an aspiration for local government and it is hoped this may be
forthcoming in future years. 
4.6 Financial Update Reports 
The Council’s future revenue budget gap is updated with the latest
assumptions and reported to Council as part of Financial Update reports
provided by the Chief Officer Resources. These report the projected gap over
a five year period which provides a longer term view of the Council’s
estimated budget gap. 
Scenario Planning 
4.7 The Financial Update reports uses scenario planning to present estimates
using a best case, mid-range and worst case scenario. Scenario planning is
an alternative to conventional forecasting that is better suited to an
environment with numerous uncertainties. Conventional forecasting
encourages organisations to focus on a narrow range of possibilities centred
on a single view about the most likely future outcome. Scenario planning, in
contrast, does not attempt to use a series of static assumptions to predict the
future. Rather, it generates a dynamic series of plausible outcomes that
generates a range of possibilities. Relatively small variations in assumptions
can lead to fairly significant changes in the outcome. Whilst the outcome will
no doubt differ from the scenarios outlined here, they provide a useful
illustration of the overall financial envelope. Note that best case, mid-range
and worst case scenarios are only applied to material areas of expenditure. 
Budget Gap Assumptions 
4.8 The future year assumptions used when projecting future year budget gaps
are set out in Exhibit 3. 
Exhibit 3– Future Year Budget Assumptions
Assumption Best Case Mid-Range Worst Case
Scottish Government
Funding
0.5% Increase Flat Cash 0.5% Decrease
Pay Award 3% 3% 4%
Strathclyde Pension
Fund Contribution
Rate
13% 15% 17.5%
General Non-Pay
Inflation
£500,000 £500,000 £500,000
Unidentified Cost
and Demand
Pressures
£1,000,000 £1,000,000 £1,000,000
Sales, Fees &
Charges
5% Increase 5% Increase 5% Increase
Council Tax Increase  No assumption No assumption No assumption
Page 209

Page 210

Page | 9 
Council Tax Base
Growth
0.5% 0.5% 0.5% 
Expenditure Baseline 
4.9 The starting point for forecasting, is to use the current year’s expenditure
budget as the baseline. The Council agreed the 2026/27 budget at its
meeting on 4 March 2026. The agreed budget provides a base budget of
£325.673m (£227.937m for general services and £97.736m for the Health
and Social Care Partnership (HSCP)).  Future expenditure budgets are then
forecast taking account of base budget adjustments, known unavoidable cost
pressures, profiling of previously taking saving options,  and estimates/
assumptions around issues such as pay awards, incremental pay
progression, and non pay inflation including utility costs and changes in
interest rates. This is summarised in Exhibit 4 to provide a projected 2027/28
expenditure budget of £333.969m 
Exhibit 4 – 2027/28 Base Budget Calculation 
£,000
2026/27 Base Budget 325,673
Additional RSG 2026/27 – Early Learning Childcare  248
Additional RSG 2026/27 - Mansion Tax 345
Base Budget Adjustments 80
Employee Costs (adjusted for anticipated reduction in
pension contribution)
4,640
Non-Pay Inflation 1,348
Cost and Demand Pressures  3,463
Increase in Sales, Fees and Charges (increased income) (471)
Profiling of Prior Year Saving Options (1,357)
2027/28 Baseline Budget 333,969 
Income Projections 
4.10 The key sources of income for the Council are Aggregate External Finance,
other UK or Scottish Governement funding, Council Tax and, where
appropriate, use of reserves. Note Sales Fees and Charges is an income but
the way the Council’s budget gap is created these are netted off against
expenditure which is why they are referenced in the expenditure section
above.  Exhibit 5 sets out the breakdown of the projected mid-range income
in 2027/28 based on current assumptions. 
Exhibit 5 – 2027/28 Mid-Range Projected Income 
£,000
Aggregate External Finance  267,822
Council Tax 50,019
Other Funding (Extended Producer Responsibility) 2,397
Use of Reserves (release from temporary pension
reserve)
3,726
2027/28 Projected Income 323,964
Page 210

Page 211

Page | 10 
Five Year Budget Gap (2027/28 to 2031/32) 
4.11 Based on the assumptions summarised above the extrapolcatyed five year
budget gap in the mid-range is summarised in Exhibit 6. 
Exhibit 6 – Five Year Budget Gap – Mid-Range Scenario 
2027/28
£,000
2028/29
£,000
2029/30
£,000
2030/31
£,000
2031/32
£,000
Base Budget 325,673 333,969 344,782 354,866 364,224
Additional
committed RSG
2026/27
593 0 0 0 0
Base Budget
Adjustments 80 927 0 (650) 0
Employee Costs 4,640 6,611 6,788 6,970 7,159
Non-Pay Inflation 1,348 1,375 1,382 1,388 1,388
Cost and
Demand
Pressures
3,463 2,697 2,434 2,195 1,695
Sales, Fees and
Charges (471) (495) (520) (545) (572)
Previous Saving
Options (1,357) (302) 0 0 0
Expenditure  333,969 344,782 354,866 364,224 373,894
Aggregate
External Finance
(267,822) (267,822) (267,822) (267,822) (267,822)
Council Tax (50,019) (50,234) (50,449) (50,877) (51,514)
Other Funding (2,397) (2,397) (2,397) (2,397) (2,397)
Use of Reserves (3,726) 0 0 0 0
Total Income /
Funds Available
(323,964) (320,453) (320,668) (321,096) (321,733)
Budget Gap
(Cumulative)
10,005 24,329 34,198 43,128 52,161
Budget Gap
(Cumulative)
10,005 14,324 9,869 8,930 9,033 
4.12 Exhibit 7 sets out a best case, mid-range and worse case analysis based on
the assumptions set out in Exhibit 3. 
Exhibit 7 – Best Case, Mid-Range and Worst-Case Summary
Scenario 2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
2031/32
£000
Best Case 7,069 21,393 31,263 40,192 49,225
Mid-Range 10,005 24,329 34,198 43,128 52,161
Worst Case 13,212 27,536 37,406 46,335 55,368 
Council Tax Income  
Page 211

Page 212

Page | 11 
4.13 Council Tax income accounts for approximately 14% of the Council’s funding
and is an extremely important consideration for the Strategy and the budget
setting process. Council Tax and Fees and Charges are the only income
streams over which the Council has control, albeit these areas can be subject
to Scottish Government direction. No assumptions are made about council
tax increases when preparing financial updates.  The setting of Council Tax is
subject to a political decision and is the means by which the Council, can
determine the extent they want to use Council Tax to deliver a legal balanced
budget. 
4.14 The Council’s level of Council Tax is broadly in line with the Scottish average.
In 2026/27, the Council increased Council Tax by 7.8%  resulting in a Band D
annual charge of £1,681.53. This provided a further £3.541m to fund the
delivery of crucial Council services. This places the Council at position 17 out
of the 32 Scottish councils. A comparison of the Council’s Band D charge
with other Scottish councils and the Scottish average is shown in Exhbit 8.
Exhibit 8 – Scotland Wide 2026/27 Band D Council Tax Rates 
Rank Council
26/27 Band D (exc
Water &
Sewerage)
1 Midlothian £1,816.16
2 Argyll & Bute £1,783.33
3 Stirling £1,752.91
4 East Dunbartonshire £1,751.67
5 Aberdeen City  £1,747.54
6 Moray £1,731.13
7 Dundee City  £1,729.76
8 East Ayrshire £1,717.28
9 Falkirk £1,714.84
10 Glasgow City  £1,706.50
11 East Lothian £1,697.62
12 South Ayrshire £1,694.96
13 Renfrewshire £1,690.55
14 Aberdeenshire £1,686.04
15 North Ayrshire £1,685.84
16 Clackmannanshire £1,683.67
17 West Dunbartonshire £1,681.53
18 Inverclyde £1,673.85
19 Perth & Kinross £1,673.84
20 Orkney Islands  £1,669.07
21 Highland £1,633.99
Page 212

Page 213

Page | 12 
22 West Lothian £1,627.59
23 City of Edinburgh £1,626.05
24 East Renfrewshire £1,620.14
25 Scottish Borders £1,618.52
26 Angus £1,598.65
27 Dumfries & Galloway £1,578.66
28 Fife £1,573.70
29 North Lanarkshire £1,554.56
30 Comhairlie Nan Eilean Siar £1,505.50
31 Shetland  Islands £1,487.90
32 South Lanarkshire £1,468.48  
Scottish Average £1,661.93 
4.15 In previous years the Scottish Government has frozen or capped Council Tax
increases. It remains to be seen if this will be the case in 2027/28 or future
years.  This would be an extremely challenging position for the Council and
would require significantly more savings to be identified to support financial
sustainability 
4.16 A 1% rise in Council Tax equates to £0.498m of additional income. The
impact of Council Tax increases of between 7.5% and 15%, has been
calculated and is summarised in Exhibit 9.   It  also shows the weekly
increase for Band D households, assuming they have no discounts or
exemptions applied to their bill.   
Exhibit 9 - Impact of Council Tax Increases 
Council
Tax
Band
2026/27
Council Tax
(£)
7.5% 
Increase
(£)
10%
Increase
(£)
12.5%
Increase
(£)
15%
Increase
(£)
A 1,121.01 1,205.09 1,233.11 1,261.14 1,289.16
B 1,307.86 1,405.95 1,438.65 1,471.34 1,504.04
C   1,494.70 1,606.80 1,644.17 1,681.54 1,718.91
D 1,681.53 1,807.64 1,849.68 1,891.72 1,933.76
E 2,209.34 2,375.04 2,430.27 2,485.51 2,540.74
F 2,732.48 2,937.42 3,005.73 3,074.04 3,142.35
G 3,293.00 3,539.98 3,622.30 3,704.63 3,786.95
H 4,119.75 4,428.73 4,531.73 4,634.72 4,737.71
Band D Weekly
Increase (£)   2.43 3.23 4.04 4.85
Total Additonal
Revenue  (£m)  3.735 4.980 6.225 7.470 
Page 213

Page 214

Page | 13 
5 Reserves 
5.1 The Council maintains a number of funds and balances, known as Reserves,
which are reported to Elected Members as part of the budgetary control
reports at regular intervals during the financial year. The existence and
management of adequate reserves is a fundamental aspect of any sound
financial strategy. 
5.2 The Council holds reserves for four main purposes: 
1. a working balance to help cushion the impact of uneven cash flows 
2. a contingency to cushion the impact of unexpected events or emergencies 
3. a means of building up funds, often referred to as earmarked reserves, to
meet known or predicted liabilities.
4. statutory reserves which are set aside for specific purposes including
maintenance of assets, income from the sale of assets which must be
used to offset capital expenditure or associated loan charges. 
5.3 The Council/s reserves strategy is based on maintaining an agreed General
Fund contingency level (prudential target) of 2.5% of the budgeted net
expenditure (net of requisitions) for the subsequent year. The adequacy of
the prudential target is subject to annual review and was decreased to from
3% to 2.5% from 2026/27 onwards. Should this contingency have to be
utilised the S95 Officer is required to put a recovery plan in place immediately
to ensure the Council’s contingency balance is restored. 
5.4 The strategy also assumes the continued use of earmarked reserves. In this
way, earmarked reserves can be separated from the core General Fund
Reserve which allows the Council to track the underlying reserves position.
Earmarked Reserves are reviewed annually as part of the budget process
and reported as part of the routine budgetary control reports. 
5.5 The Council’s usable reserves are: 
• General Fund Revenue Reserve - held for services provided by the
Council through Revenue Support Grant. It represents the Council’s
contingency for unforeseen/ unquantifiable events and includes
balances the Council has agreed to earmark for specific purposes. It
excludes the Housing Revenue Account.
• Housing Revenue Account Revenue Reserves – The Council is
required to record all revenue expenditure and income relating to the
provision of council dwellings and related services..
• Capital Receipts Reserve - capital receipts from asset sales are
retained within this reserve and used to fund planned capital
expenditure.
• Capital Grant and Receipts Unapplied Reserve - Grants and other
contributions given to the Council are retained within this reserve until
all conditions agreed by the grant provider are satisfied. 
Page 214

Page 215

Page | 14 
• Capital Items Replacement Fund - This reserve holds funds which
are retained and used for the renewal or repair of school non-current
assets. 
General Fund Revenue Reserve 
5.6 Exhibit 10 shows how the general fund revenue reserve, and its component
parts, have changed over the five year period 2021/22-2025/26 (note the
2025/26 figures are based on the unaudited accounts). 
Exhibit 10 – General Fund Revenue Reserve 5 Year Analysis 
5.7 Exhibit 10 illutrates that the level of unallocated reserves dipped under the
prudential target in 2024/25 with the position only relatively recently
recovered.  This means the Council’s financial stability is still vulnerable with
there being limited capacity to absorb funding settlements which do not
reflect inflation, or inflationary pressures exceeding assumptions.  Note that
the spike in both the overall general fund balance, and levels of earmarking in
2022/23 were largely as a consequence of the application of an accounting
flexibility for service concession arrangements which resulted in the
repayment of the service concession liability being reprofiled over the asset
life, therefore extending the repayment period. This resulted in a material
increase in the overall General Fund balance and the overall level of
earmarking as agreed by Council in December 2022.   
5.8 As at 30 June 2026, based on the 2026/27 period 3 budgetary control report
to Council on 26 August 2026,  the projection of the Council’s general fund
balance at 31 March 2027 is summarised in Exhibit 11: 
Exhibit 11 – Projected 31/03/2027 General Fund Revenue Reserve Summary 
£m £m
Prudential Target 5.510 
Balance Below Prudential Target 1.221 
Page 215

Page 216

Page | 15 
Total Unearmarked   4.289
Total Earmarked   10.059
Overall Total Reserves   14.348 
5.9 Exhibit 11 highlights that, based on the forecast 2026/27 outturn as at 30
June 2026,  the Council is projected to hold unearmarked reserves which are
£1.221m below the 2.5% Prudential Target policy. Finance will continue to
work with the services to try to mitigate the projected overspends. If this is not
successful then a recovery plan will be required in order to rebuild the
Council’s reserves. 
5.10 Exhibit 12 summarises the £10.060m of earmarked reserves which are 
projected to be held at 31 March 2027 held for  specific purposes   
Exhibit 12 – Projected 31/03/2027 Earmarked Reserves
Reserve Description 31/03/27
Balance (£)
Intromissions Future liability for historic child abuse cases  347,000
Previous provision for
equal pay/holiday pay
Equal pay/holiday pay claims and associated legal
expenses
179,591
Employability Development and delivery of key employability
initiatives to support vulnerable groups 
221,000
Extended Producer
Responsibility
Deliver future recycling initiatives 675,000
Refugee
Resettlement
Resettlement costs if there is a timing difference
between expenditure and grant income.
499,255
Empty Home Interest free/ low interest loans to property owners to
renovate or bring empty properties back into use
150,000
CCTV Network
Upgrade
Costs of the CCTV project 21,000
School Meal Cost
Hardship Fund
Assist families just above eligibility threshold for free
school meals who have been unable to pay for a
school meal
9,768
Support for
Apprenticeships
Support the Apprenticeship Investment Programme  50,000
Leisure for children
during holiday times
Payments for holiday activities provided over Easter,
summer and autumn
72,840
Family fun day events Family fun days over a four year period  16,000
Assist local food hubs Provision of food parcels 9,000
Voluntary
Redundancy & Early
Retirement 
Funding for voluntary redundancy and early
retirement 
2,313,897
Smoothing Fund Offset service overspends where delivery of
savings/efficiencies hasve been delayed
1,770,756
Reduction in
Strathclyde Pension
Fund Contribution
Build up of the SPFO saving to be used to balance
the budget in future years as agreed in 2023/24.
3,724,758
Total    10,059,865
Page 216

Page 217

Page | 16 
5.11 Appendix 1 to this report details the Council’s Policy on Reserves and
Balances. 
6 Revenue Outlook Beyond 5 Years – Risks and Issues 
6.1 Beyond five years, prediction become even more difficult. There are a
number of uncertainties which may emerge and will have a bearing on the
quantum of funds available to the Scottish Government and the distribution of
that Scottish Government funding to local authorities.  
6.2 The further we look into the future the greater the uncertainty about the
financial challenges the Council will face. There are a number of further key
issues and risks which may impact on the Council’s finances and future
projections. These include: 
• future decisions of the Scottish Government regarding protection
afforded to Local Government or other parts of the national budget
• impact of population change/ demographic shifts on funding levels
• impact of any new or revised legislation placing additional
requirements on local authorities not supported by full funding
• pay awards, both in terms of the totality of the award and the
complexity
• general inflation including energy and fuel costs
• changes to pension contributions arising from the triennial review of
Strathclyde Pension Fund
• costs associated with sustainability including waste disposal and
recycling
• potential variation of tax raising powers, including the future of Council
Tax and Non-Domestic Rates
• rising demand and cost on Council Services due to demographic
pressures
• current global, UK and Scottish economic situation, impacted by the
middle east conflict, and the medium-term impact on inflation and
interest rates. 
6.3 Whenever possible, future costs associated with issues such as those listed
in paragraph 6.2 are built into future budget gaps if they can be reasonably
estimated. Where it is not possible to estimate them with any degree of
accuracy they will be highlighted as unquantifiable future cost pressures
and/or future financial risks. 
7 Capital Plan 
Financing the Capital Plan 
7.1 The capital plan is funded by the Scottish Government (General Capital Grant
and Specific Ring-Fenced Capital Grants), other capital grants, capital
Page 217

Page 218

Page | 17 
receipts from asset disposals, revenue contributions, earmarked reserves,
and prudential borrowing. 
7.2 The Scottish Government receive a grant for capital spending from the UK
Government which is then allocated to individual councils. West
Dunbartonshire Council receives approximately £6m per annum and this is
expected to remain fairly constant for the next 4-5 years. Any spend above
this level, not funded from other grants, is funded through borrowing which
incurs interest charges.  As such the Council’s revenue budget is inextricably
linked to the financing of its capital expenditure. Consequently, when there is
sustained pressure on the revenue budget this in turn causes pressure on
capital finance and on the management of the capital programme and the
debt and borrowing requirement that arises from it 
7.3 Capital spend funded from borrowing results in loan charges until the
borrowing is fully repaid. Exhibit 13 shows how the Council’s ten year capital
plan between 2025/26 and 2035/26 (approved by Council in March 2026) is
projected to be funded. 
Exhibit 13 – Funding the Capital Plan 
Source of Funding
25/26
(£,000)
26/27
(£,000)
27/28
(£,000)
28/29
(£,000)
29/30
(£,000)
30/31
(£,000)
31/32-
35/36
(£,000)
Total
(£,000)
% of
Total
Resources Carried Forward 5,521 1,618 0 0 0 0 0 7,139 2.7%General Services Capital
Grant 12,804 6,806 5,618 5,618 5,618 5,618 28,090 70,172 26.4%
Ring-fenced Government
Grant funding 14,945 7,088 396 396 396 396 1,980 25,597 9.6%
Match-funding/other grants &
contributions 1,812 3,007 912 818 818 818 4,090 12,275 4.6%
Prudential Borrowing 23,933 37,262 19,177 36,150 4,733 4,668 23,044 148,967 56.1%
Funded from Revenue 0 400 100 100 100 100 500 1,300 0.5%
Total 59,015 56,181 26,203 43,082 11,665 11,600 57,704 265,450 100.0% 
7.4 Exhibit 13 illustrates that 56% of the Council’s capital plan is funded from
prudential borrowing.  The current financial climate, and in particular, current
bank interest rates, is having a significant impact on both the affordability and
delivery of the capital programme. The repayment of borrowing used to fund
capital creates a future revenue budget commitment over the entirety of the
anticipated lifespan of the new asset. Additional borrowing to fund more
expensive capital projects will increase the Council’s overall debt position and
will accrue substantial interest charges. These pressures are not unique to
the Council and are being faced by all councils. 
7.5 Decisions on capital spend will need to focus on obtaining best value for
money for the Council, including prioritisation to ensure the continued delivery
of essential services, a focus on mitigation of key areas of risk and
consideration of available external funding, new income generation
opportunities and budget efficiency savings that can be achieved. 
7.6 Another method of funding additional capital is through spend to save
schemes where the savings in the revenue budget are used to fund the
Page 218

Page 219

Page | 18 
increase in loans charges to service additional borrowing. It is assumed that
projects of this nature are cost neutral game in terms of forecasting, however,
there could be additional revenue savings depending on the business case. 
Spend to save schemes need to be subject to robust financial assessment
before consideration is given to their implementation. 
8 Treasury Management 
8.1 The Council is required to operate a balanced budget, which broadly means
that cash raised during the year will meet cash expenditure. Part of the
treasury management operation is to ensure that this cash flow is adequately
planned, with cash being available when it is needed. Surplus monies are
invested in low-risk counterparties or instruments commensurate with the
Council’s low risk appetite, providing adequate liquidity initially before
considering investment return. The second main function of the treasury
management service is the funding of the Council’s capital plans. As set out
in paragraph 7.4 these capital plans provide a guide to the borrowing needs
of the Council, essentially the longer-term cash flow planning to ensure that
the Council can meet its capital spending obligations. This management of
longer-term cash may involve arranging long or short-term loans or using
longer term cash flow surpluses. On occasion any debt previously drawn may
be restructured to meet Council risk or cost objectives. 
8.2 The Council’s Finance Team engage regularly with the the Council’s
Treasury advisors, MUFG Corporate Markets in relation to forecast interest
rates and options consider in relaton to Treasury Management. MUFG  most
recent interest rate forecast for Bank Rates and Public Works Loan Board
(PWLB) borrowing rates is summarised in Exhbit 14. 
Exhibit 14 – Bank Interest / PWLB Rates Projection June 2026 – March 2029 
Page 219

Page 220

Page | 19 
8.3 Exhibit 14 shows a steady downward path for both the projected bank rate
and PWLB borrowing rates from June 2026 to March 2029. The projected
Bank Rate remains at 3.75% through to June 2027, then falls
to 3.50% in September 2027, before settling at 3.25% from March 2028
onward. PWLB rates follow a similar downward trend, with shorter maturities:
(5 Year PWLB) falling from 5.00% to 4.10%, while the 10 Year
PWLB declines from 5.50% to 4.60%. Longer-term rates remain higher
throughout the period but also ease.The 25 Year PWLB drops
from 6.00% to 5.10%, and the 50 Year PWLB falls from 5.80% to 4.90%.
Overall, the table suggests borrowing costs are expected to moderate
gradually, while the yield curve remains upward sloping, with longer
maturities carrying higher rates than the bank rate and shorter PWLB
maturities. This supports an ongoing strategy to reschedule maturing debt for
shorter time periods instead of tying the Council into higher rates for an
extended period of years. 
9 Housing Revenue Account 
9.1 The Council is required to maintain a separate Housing Revenue Account
covering income and expenditure in respect of specified houses, buildings,
and land. There is a legal requirement for Housing Revenue Account income
and expenditure to be in balance at the end of each financial year. 
9.2 The Housing Revenue Account expenditure budget for 2026/27 is set at
£60.880m, an increase of £4.100m (7.2% over the previous year’s figures).
The Housing Revenue Account is financed almost entirely by rents and other
charges paid by Council tenants and cannot be funded in any way from the
General Fund and revenue raised through the Council Tax (other than in the
event the HRA has a deficit and no reserves with which to absorb it). The
largest budget lines in HRA revenue are for repairs £12.668m and the
repayment of loan charges £30.449m. 
9.3 The Housing Revenue Account capital programme must be met from existing
resources or funded through prudential borrowing. The 2026/27 budget is
£58.434m of which £24.613m is for new build housing and the buy-back
programme. HRA capital is funded by £13.064m of grant / owner
contributions with a balance of £45.370m funded through prudential
borrowing.   
9.4 Since the repayment of loan charges makes up 50% of the HRA revenue
budget, fluctuation in borrowing interest rates can have a significant impact
on the HRA finances. A 30 year HRA business plan is used to look at the
longer term viability of the HRA account. 
10  Conclusion 
10.1 The Council has effective financial management with elected members
provided with appropriate information on funding gaps and saving options to
enable them to make soundly based decisions when setting the budget.
Sound financial management and transparency will continue to be crucial in
Page 220

Page 221

Page | 20 
the years ahead as the Council progresses this Financial Strategy and takes
action to close the projected budget gap. 
10.2 This financial strategy is deliberately disciplined.  It does not rely on reserves
to balance future years budgets, makes no assumptions in relation to funding
growth beyond prudent assumptions in relation to the local government
settlement and does not commit the Council to ambitious plans which it
cannot afford to sustain. 
10.3 The Council is forecast to have a budget gap of £52.2m for the period
2027/28 to 2031/32 based on current assumptions and the medium risk
scenario. Financial planning will be key to meeting the challenges around
resources and future funding and this Strategy will prepare the Council to
take the necessary actions to counter the pressures and close the budget
gap. 
Page 221

Page 222

Page | 21 
Appendix 1 – Policy on Reserves and Balances 
Introduction 
A key component to sound financial and risk management is that the Council
maintains adequate reserves and balances to meet known future commitments or
expenditure arising from unforeseen, unexpected or emergency situations. 
Where appropriate, this policy adopts: 
• Local Authority Reserves and Balances (LAAP Bulletin 99)
• The Statutory Basis for Accounting and Disclosing Reserves in Local Authorities
in Scotland 
• CIPFA/LASAAC Code of Practice on Local Authority Accounting in the United
Kingdom 
The purpose of this policy is to: 
• outline the legislative and regulatory framework underpinning the creation, use
or assessment of the adequacy of reserves
• identify the principles to be employed by the Council in assessing the adequacy
of the Council’s balance and reserves
• indicate how frequently the adequacy of the Council’s balances and reserves
will be reviewed
• set out arrangements relating to the creation, amendment and use of reserves
and balances. 
The Council has a range of reserves and balances. These fall into two categories: 
• Usable Reserves
• Unusable Reserves. 
Usable Reserves
These are reserves available for use by the Council. They are held on the Council’s
Balance Sheet for use, as appropriate, through this Policy. 
Usable Reserves are held for four main purposes: 
• A working balance to help cushion the impact of uneven cash flows - this forms
part of general reserves.
• A contingency to cushion the impact of unexpected events or emergencies.
• A means of building up funds to meet unknown or predicted liabilities.
• statutory reserves which are set aside for specific purposes including
maintenance of assets, income from the sale of assets which must be used to
offset capital expenditure or associated loan charges. 
For each reserve held, there should be a clear protocol on: 
Page 222

Page 223

Page | 22 
• the reason for/purpose of the reserve
• how and when the reserve can be used
• a process and timescale for review of the reserve to ensure ongoing relevance
and adequacy. 
The Usable Reserves held by the Council are: 
(a) General Fund Revenue Reserve
The General Fund is held for all services provided by the Council through Revenue
Support Grant provided by the Scottish Government and Council Tax paid by
residents within the Council area. It excludes the Housing Revenue Account (HRA),
which is funded from tenant rents. 
(b) HRA Revenue Reserve
The Council is required by the Local Government and Housing Act (Scotland) 1987
to keep a HRA which records all revenue expenditure and income relating to the
provision of council dwellings and related services. The use of this account is
prescribed by statute and the Council is not allowed to use it to fund expenditure for
non-housing related services. 
For both the General Fund and the HRA Reserves the level and utilisation of
reserves will be determined formally by the Council, informed by the advice and
judgement of the Section 95 Officer (Chief Officer Resources). Where the Section
95 Officer’s advice is not accepted, this should be recorded formally in the minutes
of the appropriate Council meeting. 
The balance of these reserves normally comprises three elements: 
• Funds that are earmarked or set aside for specific purposes (in Scotland, the
Council cannot have a separate Earmarked Reserve within the Balance Sheet,
but can highlight elements of the General Fund Reserve balance required for
specific purposes). 
• Funds which are not earmarked for specific purposes, but are set aside to deal
with unexpected events or emergencies. Currently using a risk based
assessment, the Council has a specific policy agreed each year and at present
this ‘prudential target’ is set at 2.5% of net expenditure (excluding requisitions).
• Funds held in excess of the prudential target and the identified earmarked sums.
Reserves of this nature can be spent or earmarked at the discretion of
Members. 
Principles to assess the adequacy of the reserves
In order to assess the adequacy of unallocated reserves, the S95 officer should take
account of strategic, operational and financial risks facing the Council. The
assessment should include external risks (e.g. environmental or economic factors)
as well as internal risks (e.g. the ability to deliver planned efficiency savings). 
Use of unallocated reserves
Balancing the annual budget by drawing on unallocated reserves may be a
legitimate short term option. However, CIPFA has commented that councils should
be wary about the one-off use of reserves to deal with shortfalls in current funding or
Page 223

Page 224

Page | 23 
for recurring expenditure. The Council’s finance strategy makes no assumption
about use of reserves to balance budgets. 
(c) Capital Receipts Reserve
Under Schedule 3, paragraph 22 of the Local Government (Scotland) Act 1975,
capital receipts on the sale of non-current assets received by the Council are
retained within this Reserve until capital expenditure dictates the required use for
the funds. Receipts for both General Fund and HRA are held separately, as
specified above. Any receipts unused at 31 March will be held on the Balance Sheet
as at that date. 
(d) Capital Grant and Reserves Unapplied Reserve
Grants and other contributions given to the Council are retained within this Reserve
until all conditions agreed by the grant provider are satisfied. The use of this fund is
specified within the CIPFA/LASAAC Code of Practice on Local Authority Accounting
in the United Kingdom, as revised each year. Any grants unapplied at 31 March will
be held on the Balance Sheet as at that date. 
(e) Capital Items Replacement Fund (Other Reserve)
Scottish Councils have explicit statutory powers under schedule 3 of the Local
Government (Scotland) Act 1975 to establish Renewal and Repairs Funds.  This
reserve is used for the purpose of defraying expenditure to be incurred in repairing,
maintaining and renewing any buildings, works, plant, equipment or articles
belonging to the authority. At present the Council only holds one such fund, which is
held within the Education Service. Separate and specific guidance is available for
the use of this Fund. Funds are used for the renewal or repair of school non-current
assets, with funds being linked specifically to the individual schools committing their
budget for the purpose of repairs and renewals at a future date. 
(f) Capital Reserve
This reserve is used to defray any expenditure of the Council to which capital is
properly applicable, or in providing money for repayment of the principal of loans. It
holds income (either specific capital receipts income or agreed contributions from
revenue) which has been earmarked by Council for the funding of the Public Private
Partnership (PPP) unitary charge on a specific annual phased amount. The PPP
unitary charge liability can be split into revenue and capital related charges and this
Reserve is used specifically to help fund the capital related charges. The Funds can
be added to this Fund as agreed by Council (e.g. the sale of specific Education non-
current assets) or at the discretion of the Section 95 Officer (i.e.in the event of a
review identifying a risk of shortfall in the funding structure over the life of the
project). 
Unusable Reserves 
These are reserves that are not available for use by the Council. They arise from the
reconciliation of accounting requirements driven by reporting standards and
statutory requirements. They are not resource-backed and are held on the Council’s
Balance Sheet for use as appropriate through the CIPFA/LASAAC Code of Practice
on Local Authority Accounting in the United Kingdom. The Unusable Reserves held
by the Council are:
Page 224

Page 225

Page | 24 
(a) Capital Adjustment Account
The Capital Adjustment Account absorbs the timing difference arising from the
different rates at which assets are depreciated under proper accounting practice and
are financed through the capital controls system.  The account contains revaluation
gains accumulated on property, plant and equipment before 1 April 2007, the date
that the Revaluation Reserve was created to hold such gains. 
(b) Revaluation Reserve
The Revaluation Reserve contains the unrealised gains arising from increases in the
value of its property, plant and equipment (and intangible assets).  The balance is
reduced when assets with accumulated gains are:
• re-valued downwards or impaired and the gains are lost
• used in the provision of services and the gains are consumed through
depreciation
• disposed of and the gains are realised. 
The reserve contains only revaluation gains accumulated since 1 April 2007, the
date that the reserve was created.  Accumulated gains arising before that date are
consolidated into the balance on the Capital Adjustment Account.  
(c) Pension Reserve
The Pension Reserve absorbs the timing differences arising from the different
arrangements for accounting for post-employment benefits and for funding benefits
in accordance with statutory provisions.  The Council accounts for post-employment
benefits in the Comprehensive Income and Expenditure Statement as the benefits
are earned by employees accruing years of service, updating the liabilities
recognised to reflect inflation, changing assumptions and investment returns on any
resources set aside to meet the costs.  However statutory arrangements requires
benefits earned to be financed as the Council makes employer’s contributions to
pension funds or eventually pays any pension for which it is directly responsible. 
The debit balance on the pensions reserve therefore shows a substantial shortfall in
the benefits earned by past and current employees and the resources the Council
has set aside to meet them.  The statutory arrangements will ensure that funding will
have been set aside by the time the benefits come to be paid. 
(d) Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would
otherwise arise on the general fund/ HRA balance from accruing for compensated
absences earned but not taken in the year, e.g. annual leave entitlement carried
forward at 31 March.  Statutory arrangements require that the impact on the General
Fund balance is neutralised by transfers to or from this account. 
(e) Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing difference arising
from the different arrangements for accounting for income and expenses relating to
certain financial instruments and for bearing losses or benefiting from gains per
statutory provisions.   The Council uses the account to manage premiums paid on
the early redemption of loans.  Premiums are debited to the Comprehensive Income
and Expenditure Statement when they are incurred, but reversed out of the General
Page 225

Page 226

Page | 25 
Fund balance to the account in the Movement in Reserves Statement.  Over time,
the expense is posted back to the General Fund balance in accordance with
statutory arrangements for spreading the burden on council tax.   
Accounting and Disclosure
Expenditure should not be charged direct to any reserve. Any movement within
Revenue Reserves is accounted for as an appropriation and is transparent. Entries
within a reserve are specifically restricted to ‘contributions to and from the
consolidated Income and Expenditure Account’ with expenditure charged to the
service revenue account. The appropriation is made from the reserve to the
Movement in Reserves to neutralise the impact on the Council Tax or the Housing
Rents. 
Any revision to this Policy (including creation or amendment to any reserve or use
of any reserve) requires to be reported, considered and approved by Council. 
Page 226

Page 227

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Resources
Council: 26 August 2026
–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Subject:    Quarterly Treasury Management Update to 30 June 2026 
1.  Purpose
1.1  This report presents updated West Dunbartonshire Council (the Council) on
Treasury Management activity for the first quarter of the 2026/27 financial
year from 1 April 2026 to 30 June 2026.
2. Recommendations 
2.1 It is recommended Council notes the Treasury Management activity for the
quarter ended 30 June 2026.
3. Background
3.1 The Council manages its treasury activities in line with the CIPFA Code
‘Treasury Management in the Public Services’. The Code requires the Council
to produce reports on its Treasury Management policies, practices and
activities on a regular and ongoing basis. The Council fulfils these obligations,
in part, by the preparation of this Treasury Management Monitoring report
produced on a quarterly basis, encompassing a review of performance.
Quarterly reporting of these treasury management prudential indicators is now
a recommended part of the governance framework for local authorities. 
3.2 The Council’s Treasury Management Strategy 2026/2027 and Treasury and
Prudential Indicators 2026/27 to 2035/36 were approved by Council at its
meeting on 25 March 2026. The Treasury activity undertaken in the first
quarter of 2026/27 reflects the key requirements of the Council’s 2026/27
Treasury Management Strategy.
4.  Main issues
4.1 UK Economic update *Source – MUFG Treasury Management Update,
Quarterly Report, 30th June 2026 
• The first quarter saw the economy starting to falter with a 0.1% month
of month fall in real GDP in April
• Inflation is currently around 2.8%
ITEM 11
Page 227

Page 228

• Bank of England has left the base rate at 3.75% as the economy
remains weak
The economy performed well in the early stages of the energy shock, with
GDP rising by a strong 0.6% quarter on quarter between January and March.
But that will likely be the high point of the year. Indeed, the 0.1% month on
month fall in real GDP in April was the first decline since August 2025 and
brought the first signs that the economy is starting to crack. 
CPI inflation held steady in May at 2.8%. There wasn’t much support to
inflation from energy effects. The 0.3% month on month fall in fuel prices was
smaller than the 1.6% month on month drop last May and meant fuel inflation
rose only a bit from 23.0% to 24.6%. After rising to 129.6%, heating oil
inflation eased to 95.6%. And the 13.5% rise in the Ofgem utility price cap,
which will add 0.6 percentage points (ppts) to CPI inflation, doesn’t take effect
until 1st July. With food & drink inflation easing to its lowest rate since late
2024, higher energy costs do not seem to be boosting other items of the CPI
just yet. 
There were two Monetary Policy Committee (MPC) meetings this quarter. The
first, on 30th April, saw the Bank Rate stay at 3.75% with an 8-1 split vote in
favour of that decision.  One member dissented and voted for a 0.25%
increase to 4%, citing inflation concerns, something generally noted as a
primary concern within the minutes and reflecting heightened caution due to
potential energy supply shocks caused by the Middle East conflict. 
By the time the MPC next met on 18th June, the split widened, with two
members voting to raise rates to 4%.  However, with headline CPI inflation
sticking at 2.8%, the market’s sentiment that there may, but only may, be a
need for a single rate increase over the next few months seems to be aligned
to the way the MPC is thinking and is also similar to our own view of rates
staying at 3.75% but with upside risk. 
4.2  Interest Rate Forecast
The Council’s Treasury advisors, MUFG Corporate Markets, provided the
following interest rate forecast as at 25 March 2026 for Bank Rates and Public
Works Loan Board (PWLB) borrowing rates. There has been no change to the
rates following receipt of this forecast.
Table 1: MUFG Corporate Markets Interest rate review as at 25 March 2026.
Page 228

Page 229

4.3 Investments and Benchmarking
Cash flow, uncertainty, and the need to maintain liquidity, has meant the
Council has held most of its cash balances in Money Market Funds and with
the Debt Management Office.
The rate of return on Money Market Fund investments has increased during
the quarter.
All investment decisions are taken with reference to CIPFA’s Code of Practice
on Treasury Management where security of funds is the overriding
consideration, then liquidity and finally yield.
As at 30 June 2026, the Council held cash balances of £36.232m, of which
£1.232m was immediately available in the Council’s bank account and a
further £35m immediately available from holdings in Money Market Funds and
deposits held with the Debt Management Office. 
The Council’s investment portfolio for the first quarter of 2026/27 is shown in
the following Table:
Table 2: Investment portfolio at 30 June 2026
Short term
investments
Counterparty
Total
investments at
start of quarter
£’000
Total
investments
30 June
2026
£’000
Interest
rate at
start of
quarter
%
Interest
rate 30
June
2026
%
Type 
Banks     Instant
Access  Virgin Money
Bank
(Main bank)
1,520 1,232 3.65 3.65 
DMO 7,000 15,000 3.70 3.70 
Money Market
Funds    
Instant
Access Federated 5,000 5,000 3.82 4.01 
Blackrock 5,000              5,000 3.76 3.82 
State Street 5,000 5,000 3.78 3.85 
Abrdn 5,000 5,000 3.80 3.85 
Total
Investments
28,520 36,232   
Page 229

Page 230

Table 3: Benchmark Investment Returns 2026/27
Benchmark period Benchmark return as 30 June 2026
1 Month 3.74%
3 Months 3.75%
6 Months 3.76%
12 Months 3.95%
*The rates shown above are based on the backward-looking Sterling
Overnight Index. Source MUFG Executive Summary 30/06/2026
4.4  Borrowing Requirement and Debt
The Council's underlying need to borrow to finance capital expenditure,
termed the Capital Financing Requirement (CFR) is shown below. The
2026/27 CFR is expected to increase as a result of additions to the capital
plan.
Table 4: Borrowing Requirement (CFR) 2026/27 
31 March 2026
Actual
£’000
31 March 2027
Budget Estimate
£’000
Projected as at
June 2026
£’000
Total CFR 923,501 983,180 996,082 
4.5  Borrowing Outturn for 2026/27
The approved Capital programmes for both the General Fund and the HRA
for 2026/27 indicated additional external borrowing would need to be
undertaken to finance capital expenditure within the year. 
During the period to 30 June 2026, the Council undertook borrowing from the
Public Works Loan Board of £45m in June 2026. MUFG Corporate Markets,
the Council’s treasury management advisers, provided information on the
economic outlook and interest rate forecast to enable the Council to make an
informed decision on borrowing. The duration of the loans was short and
medium terms on the expectation of a forecast reduction in the bank rate. It is
anticipated that the Council will refinance the debt as it falls due at a lower
interest rate. Following the additional borrowing being undertaken, the Council
remains in an under borrowed position.
The Council's external borrowing position as at 30 June 2026 and expected
year end position is illustrated in the undernoted table: 
Page 230

Page 231

Table 5: External borrowing at 2026/27  
Actual March
2026
£’000
Actual June
2026
£’000
Projected
March 2027
£’000
Local Authority
Loans
250,500 217,500 265,500
PWLB  573,419 602,236 586,419
Market Loans 32,300 32,300 32,300
Other long-term
liabilities
1,424 1,424 1,424
Long Term
Liabilities - PFI
78,508 78,508 78,508
Total 936,151 931,968 964,151 
The level of borrowing is forecast to increase by the end of 2026/27. This is
on the basis that no new external borrowing is undertaken during the
remainder of the year.
4.6  External Debt 
At the end of the quarter, total external debt amounted to £899.7m, a
reduction of £36.4m. This was primarily due to repayment of existing local
authority loans falling due for repayment, from PWLB borrowing undertaken of
£45m in the current quarter. 
4.7  Borrowing in Advance of Need
The Council has not borrowed in advance of need in the three months ended
30 June 2026 and has no intention to borrow in advance during the remainder
of 2026/27.
4.8  Debt Rescheduling
Debt rescheduling opportunities have been very limited in the current 
economic climate, given the consequent structure of interest rates.
Consequently no debt rescheduling has been undertaken to date in the
current financial year. 
4.9  Compliance with Prudential Limits 
The Operational Boundary is the limit beyond which external debt is not
normally expected to exceed.  In most cases, this would be a similar figure to
the CFR but may be lower or higher depending on the levels of actual debt. 
Page 231

Page 232

The Authorised Limit for External Borrowing – This is a key prudential
indicator and represents a control on the maximum level of borrowing. This
represents a legal limit beyond which external debt is not allowed to exceed.
Table 6 shows that actual borrowing did not exceed the target indicators for
the quarter. 
Table 6. 
Target
Indicators
2026/2027   
£000
Actual
Borrowing
June 2026
£000
Operational Boundary (Exc Long Term
Liability)
991,819 853,460
Authorised Limit (Exc Long Term Liability) 1,081,985 853,460
CFR 983,180 853,460 
5.  Resource issues
While interest rates have risen over the past few years, Bank base 
rates are now starting to reduce. In relative terms rates remain high compared
to the past decade and UK Government targets. The Council has focused on
accessing short-term rather than long-term borrowing on the basis that rates
are expected to fall further. The use of short- term borrowing does however
have associated risks such as market rates increasing, and/or appropriate
borrowing not being available when required. This approach is kept under
regular review and may be changed depending on the prevailing short and
long- term rates. The use of short-term borrowing does mitigate the risk of
locking into long- term borrowing when rates are forecast to fall in the coming
months. 
6. Option Appraisal 
6.1 No option appraisal was required for this report. 
7. People Implications 
7.1 There are no people implications. 
8. Financial and Procurement Implications 
8.1 There are no direct financial or procurement implications arising from this
report. 
Page 232

Page 233

9. Risk Analysis 
9.1  The main risks are as follows: 
(a) Capital inflation may increase capital expenditure levels, which in turn may
affect the capital financing and borrowing requirement leading to an increase
in borrowing, assuming no additional capital receipts are available. 
(b) The risk of counterparties default (i.e. loss of principal sum invested) however
the Council has robust controls included within its treasury management and
investment strategies that help minimise this risk. 
10. Equalities Impact Assessment (EIA) 
10.1 No equalities impact assessment was required in relation to this report. 
11. Environmental Sustainability 
11.1 No assessment of environmental sustainability was required in relation to this
report. 
12. Consultation 
12.1 The views of Legal Services have been requested on this report who advised
there are no issues or concerns. 
13. Strategic Assessment 
13.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the 5
strategic priorities of the Council’s Strategic Plan. 
13.2  Treasury management contributes to the Financial Strategy via the
interdependency that exists between pro-active treasury management
and the formulation of long-term financial plans. 
______________
Laurence Slavin
Chief Officer – Resources
Date: 27 July 2026 
Person to Contact:  Lynsey Dickson, Finance Business Partner  
Council Offices, Church Street, Dumbarton
Page 233

Page 234

E-mail: lynsey.dickson@west-dunbarton.gov.uk 
Background Papers:   Treasury Management Strategy – Council 25 March
2026 and Audit Committee 10 June 2026 
Wards Affected:  All Wards  
Page 234

Page 235

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 26th August 2026
___________________________________________________________________ 
Subject: General Services Revenue Budgetary Control Report to 30th June 2026  
(Period 3) 
1. Purpose 
1.1 The purpose of this report is to advise Council of the 2026/27 Revenue
Budget position at 30 June 2026 and the forecast position of the General
Fund Reserve as at 31 March 2027. 
2. Recommendations 
2.1 Council is asked to: 
i) note the overall adverse variance (overspend) on the General Fund Revenue
Budget of £1.788m (0.55% of the total budget).  £1.665m (0.51%) of this
relates to General Services Delivery Budget and £0.123m (0.04%) relates to
non-service budgets.   
ii) note the current projected use of earmarked reserves of £8.788m. 
3. Background 
3.1 At the meeting of West Dunbartonshire Council (the Council) on 4 March
2026, members agreed the revenue estimates for 2026/2027.  A total net
budget of £325.673m was approved for General Services. 
3.2 Since the budget was agreed, additional funding has been provided by the
Scottish Government of £0.593m, resulting in a revised total net budget of
£326.266m. 
Service £m £m
Agreed budget 6 March 2025   325.673
Additional Resources:   
Additional ELC funding for sustainable
rates
Education 0.248 
Council Tax Revaluation Mansion Tax VJB requisition 0.345 
Total Additional Resources   0.593
Revised Budget as at Period 3   326.266 
ITEM 12
Page 235

Page 236

4. Main Issues 
Service Delivery Position 
4.1 The summary report at Appendix 1 highlights a projected adverse variance
(overspend) against General Services Delivery of £1.665m (0.51% of the total
budget), £0.123m on non-service budgets making an overall projected
adverse variance of £1.788m.  Appendix 2 provides more detailed service
reports by Chief Officer. The main reason for this overspend is detailed in the
table below with explanations provided in Appendix 3.   
Service Variances £m £m
Resources:
• Adverse variance within Finance due to
turnover saving not achieved in year
• Other variances across the service 
0.080 
(0.009)    0.071
Regulatory & Regeneration:
• Favourable variance due to vacancies 
• Adverse variances due to an overspend on
supplies & services, partially offset by additional
income.  
• Under recovery in income mainly due to a
reduction in pest control and sequestration
income. 
(0.019) 
0.065 
0.054  0.100
People & Technology:
• Adverse variance within ICT due to turnover
saving not achieved in year
• Adverse variance within Central Admin Support
due to turnover saving not being achieved
(£74k) and increased cost of postage (£45k) 
• Other variances across the service 
0.065 
0.119 
0.052  0.236
Citizens, Culture and Facilities:
• Adverse variance anticipated within Events due
to the costs associated with the Pipe Band
Championship
• Other variances across the service 
0.035 
0.022  0.057
Education:
• Adverse variance on the cost of long-term
absence teaching cover 
• Increase in SPT Bus Contracts
• Other variances across the service 
0.852 
0.178
(0.036) 
0.994
Roads & Neighbourhood Services:
• Favourable variance within Roads due to 
vacancies and an underspend on street lighting;
offset by an overspend on rates and transport
costs.
• Adverse variance within Waste Services mainly
due to turnover saving not achieved in year,
partially offset by an underspend on waste 
(0.107) 
0.161 
Page 236

Page 237

disposals costs and additional income from
brown bin permits
• Adverse variance within Grounds Maintenance
& Street Cleaning due to an under recovery in
income due to a reduction in the level of works
undertaken in 2026/27.  There are also
overspends on staff costs due to turnover not
being achieved and increased property costs.
• Adverse variance within Burial Grounds due to
the turnover saving not being achieved and a
reduction in sales income from Burials
• Adverse variance within Crematorium due to
the turnover saving not being achieved and a
reduction in sales income from Cremations
• Other variances across the service 
0.167 
0.068 
0.051 
0.014 
0.354
Housing & Employability:
• Favourable variance within Homelessness
• Services due to employee vacancies
• Adverse variance in relation to Resettlement
Services due to the uncertainty of future grant
income
• Other variances across the service 
(0.295) 
0.201 
(0.023)  (0.117)
Miscellaneous Services:
• Small underspends across the service  (0.030)  (0.030)
Adverse variance in Service Delivery at Period 3  1.665
Non-Service Budgets:
• Loan Charges
• Adjustment to non-GAE allocation following
review of CSA model. 
0.600 
(0.477)  0.123
Adverse variance in Non-Service Budget  0.123
General Fund variance as at Period 3  1.788 
4.2 Information on any projected annual variances in excess of £0.050m are
highlighted and noted within Appendix 3, with additional information on action
being taken to minimise or mitigate overspends where possible. 
Earmarked Reserve Position 
4.3     As part of the 2026/27 budget, it was agreed to use £6.243m of strategic
reserves to balance the budget. 
4.4     Services are forecasting the use of £1.890m of operational earmarked
reserves in 2026/27. In addition, there is a further use of £0.654m forecast
from strategic reserves making the total use of strategic reserves £6.897m.
Full details are provided in Appendix 4. 
4.5 The Council’s General Fund contingency (Prudential Target) is set at 2.5% of
net expenditure for 2026/27 as agreed 4 March 2026 and amounts to
£5.510m. After taking into consideration the forecast adverse position of 
Page 237

Page 238

£1.788m, the Council is currently forecast to be £1.221m below the current
Prudential Target as at 31 March 2027. Finance will continue to work with the
services to try to mitigate the projected overspends.  
4.6 Appendix 5 shows the latest position in respect of Unallocated and Earmarked
Reserves and shows the projected balance as at 31 March 2027: 
Unearmarked
Balance (£m)
Earmarked
Balance (£m)
Total General Fund
Reserves (£m)
As at 31 March 2026  6.077 18.847 24.924
Projected in year use
of reserves
(1.788) (2.545) (4.333)
Budgeted use of
reserves
0.000 (6.243) (6.243)
Projected Balance 
as at 31 March 2027
4.289 10.059 14.348 
Monitoring of Efficiencies 
4.7 A list of agreed efficiencies and management adjustments totalling £4.105m is
shown within Appendix 6.  Current indications show that £3.746m (91%) is on
target to be achieved.   
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the projected in-year financial position for the General
Services revenue budget. 
8. Risk Analysis 
8.1 The main risks are as follows: 
(a) The present variances should be viewed in the knowledge that there are
a number of variable factors which could arise between now and 31
March which could affect the year end; 
(b) As a consequence of current market conditions, capital receipts may
either not be received or they may be less than anticipated. The budget
assumption is that all capital receipts achieved in 2026/27 will be used
for principal and premium repayments within the loan charges budget.
Any shortfall in capital receipts below that budgeted amount will
adversely affect the revenue budget position. This is being closely
monitored and any issues will be reported to Council; 
Page 238

Page 239

(c) As a consequence of current market conditions, inflation remains volatile
and interest rates are reducing more gradually than initially anticipated.
To forecast for the full year costs budget assumptions have been
required (particularly around energy costs and interest rates). These
assumptions continue to change regularly and therefore it is likely that
the projected year end budgetary position will change from that reported. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report. 
11. Consultation 
11.1 All services involved in delivering the revenue budget have been consulted in
the compilation of this report. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the strategic
priorities of the Council’s current Strategic Plan. This report forms part of the
financial governance of the Council. 
__________________
Laurence Slavin
Chief Officer – Resources
Date: 26 August 2026
__________________________________________________________________
Person to Contact: Carol Alderson. Finance Manager 
Council Offices, Church Street, Dumbarton  
E-mail: carol.alderson@west-dunbarton.gov.uk 
Appendices: Appendix 1 - Revenue Budgetary Control 2026/27 
– Corporate Summary; 
Appendix 2 -  Revenue Budgetary Control 2026/27
– Chief Officer Summaries;
Appendix 3 - Analysis of Revenue Variances over 
£50,000; 
Appendix 4 -  Monitoring of Earmarked Balances 
Appendix 5 -  Reconciliation of General Fund Reserves
Appendix 6 - Monitoring of Efficiencies 
Page 239

Page 240

Background Papers: 
• Ledger output – Period 3;
• General Services Revenue Estimates 2026/27   
Wards Affected           All Wards 
Page 240

Page 241

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2026/27
SUMMARY
PERIOD END DATE 30 June 2026
Total Budget Spend to Date Projected Spend Use of Earmarked
Reserves
Variance after
the use of
Earmarked
Reserves
Annual RAG
Status
£000 £000 £000 £000 % £000 £000
Resources 6,096 7,630 6,167                    71 1.2% 0 71 
Regulatory and Regeneration 5,092 1,267 5,890                    798 15.7% 698 100 
People & Technology 11,563 3,873 11,862                  299 2.6% 63 236 
Citizens, Culture and Facilities 20,848 5,216 20,925                  77 0.4% 20 57 
Education, Learning and Attainment 139,552 34,885 140,645                1,094 0.8% 100 994 
Roads and Neighbourhood 19,661 5,696 21,278                  1,617 8.2% 1,263 354 
1,287 230 1,170 (117) -9.1% 0 (117) 
Miscellaneous Services 8,416 2,492 8,787                    371 4.4% 401 (30) 
Requisition (VJB) 1,453 363 1,453                    0 0.0% 0 0 
Requisition (SPT) 1,611 403 1,611                    0 0.0% 0 0 
Requisition (HSCP) 97,736 24,434 97,736                  0 0.0% 0 0 
General Services Delivery sub-total 313,315 86,489 317,524 4,209 1.3% 2,545 1,665 
Non-Service Budgets
Loan Charges 22,958 5,740 23,558                  600 2.6% 0 600 
Capital Receipts used to fund Loan Charges (2,384) 0 (2,384) 0 0.0% 0 0 
Non GAE Allocation (7,623) (1,906) (8,100) (477) 6.3% 0 (477) 
Non-Service Budget sub-total 12,951 3,834 13,074 123 0.9% 0 123 
Total Expenditure 326,266 90,323 330,598 4,332 1.3% 2,545 1,788 
Council Tax (49,804) (12,451) (49,804) 0 0.0% 0 0 
Revenue Support Grant (167,838) (41,960) (167,838) 0 0.0% 0 0 
Non Domestic Rates (99,984) (24,996) (99,984) 0 0.0% 0 0 
Central Government Funding (2,397) 0 (2,397) 0 0.0% 0 0 
Use of reserves (6,243) 0 (6,243) 0 0.0% 6,243 0 
Total Resources (326,266) (79,407) (326,266) 0 0.0% 6,243 0 
Net Expenditure 0 10,916 4,332 4,332 0.0% 8,788 1,788 
Department Summary Variance
Housing and Employability
General Services Delivery
Page 241

Page 242

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
RESOURCES SUMMARY
PERIOD END DATE 30 June 2026
Total
Budget
Spend to
Date
Projected
Spend
Use of Earmarked
Reserves
Variance after the use
of Earmarked
Reserves
Annual
RAG Status
£000 £000 £000 £000 % £000 £000
330 4 318 (12) -4% 0 (12) 
1,727 470 1,806 80 5% 0 80 
2,201 1,239 2,201 0 0% 0 0 
2,690 588 2,690 (1) 0% 0 (1) 
438 162 460 21 5% 0 21 
(29) 0 (29) 0 0% 0 0 
(1,117) (80) (1,102) 15 -1% 0 15 
1,177 388 1,189 12 1% 0 12 
(1,321) 4,857 (1,366) (46) 3% 0 (46) 
0 1 0 0 0% 0 0 
6,096 7,630 6,167 71 1% 0 71 Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Corporate Asset Maintenance
Office Accommodation
Corporate Assets
Variance
Service Summary
Service / Subjective Summary
Finance Service Centre
Audit
Revenues & Benefits
Page 242

Page 243

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 30 June 2026
Total
Budget
Spend to
Date
Projected
Spend
Use of Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
Annual
RAG Status 
£000 £000 £000 £000 % £000 £000
1,395         382            1,431             36 3% 0 36 
666            157            691                24 4% 0 24 
(213) (22) (202) 11 -5% 0 11 
877            191            812                (65) -7% 0 (65) 
684            23              972                288 42% 253 35 
709            163            717                8 1% 0 8 
Economic Development 974            374            1,468             494 51% 445 49 
5,092         1,267 5,890             798 16% 698 100 
Democratic and Registration Service
Legal Services/Trading Standards
Licensing
Environmental Health
Planning
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Procurement
Page 243

Page 244

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
PEOPLE AND TECHNOLOGY
PERIOD END DATE 30 June 2026
Total
Budget 
Spend to
Date 
Projected
Spend
Use of Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
Annual
RAG Status 
£000  £000  £000  £000 % £000 £000
1,033         255            1,060         27              3% 0 27 
2,006         462            2,093         87              4% 63 24 
5,414         2,491         5,479         65              1% 0 65 
Central Administration Support 3,110         665            3,230         120            4% 0 120 
-             -             -             -             0% 0 (0) 
11,563       3,873         11,862       299            3% 63 236 
Variance
Total Net Expenditure
Transactional Services
Provision for Legal Fees & Settlements
Information Services
Strategic People and Change
Service / Subjective Summary
Service Summary
Page 244

Page 245

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 30 June 2026
Total Budget Spend to Date Projected
Spend
Use of Earmarked
Reserves
Variance after the use
of Earmarked Reserves
Annual
RAG Status
£000 £000 £000 £000 % £000 £000
298.00                   77.00                     328.00      30.00         10% 0 30 
1,516.00                406.00                   1,525.00   9.00           1% 0 9 
237.00                   56.00                     243.00      6.00           3% 0 6 
Clydebank Town Hall 340.99                   39.55                     340.99      -             0% 0 0 
Libraries 2,014.00                93.04                     2,026.00   12.00         1% 10 2 
Arts and Heritage 301.00                   74.00                     264.00      37.00-         -12% 0 (37) 
Catering Services 5,905.46                1,642.07                5,905.46   -             0% 0 0 
Building Cleaning 2,180.47                487.52                   2,180.47   -             0% 0 0 
Building Cleaning PPP 30.98-                     394.21                   30.98-        -             0% 0 0 
Facilities Assistants 2,676.97                593.60                   2,676.97   -             0% 0 0 
Facilities Management 630.07                   134.05                   630.07      -             0% 0 0 
Events 19.00                     70.00                     54.00        35.00         184% 0 35 
Leisure Management 4,526.00                1,097.67                4,537.00   11.00         0% 10 1 
Registrars Service 156.00                   33.00                     167.00      11.00         7% 0 11 
School Crossing Patrollers 77.55                     18.53                     77.55        -             0% 0 0 
20,847.52              5,216.25                20,924.52 77.00         0% 20 57 
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy
Page 245

Page 246

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 30 June 2026
Total Budget Spend to
Date
Projected
Spend
Use of Earmarked
Reserves
Variance after the use
of Earmarked Reserves
Annual
RAG Status
£000 £000 £000 £000 % £000 £000
Primary Schools 35,783 8,884 36,386 603 2% 0 603 
Secondary Schools 36,670 9,733 37,188 519 1% 0 519 
Specialist Educational Provision 25,218 5,113 25,171 (47) 0% 0 (47) 
Psychological Services 812 95 763 (49) -6% 0 (49) 
Sport Development / Active Schools 627 589 627 0 0% 0 0 
Early Education 21,451 4,732 21,706 255 1% 0 255 
PPP 13,929 4,506 13,833 (96) -1% 0 (96) 
Creative Arts 687 171 690 3 0% 0 3 
Curriculum for Excellence 72 9 72 0 0% 0 0 
Central Admin 948 552 969 21 2% 100 (79) 
Workforce CPD 290 61 279 (11) -4% 0 (11) 
Performance & Improvement 558 97 535 (23) -4% 0 (23) 
Education Development 2,509 343 2,426 (83) -3% 0 (83) 
139,552 34,885 140,645 1,094 1% 100 994 
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure
Page 246

Page 247

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 30 June 2026
Total
Budget
Spend to
Date 
Projected
Spend
Use of Earmarked
Reserves
Variance after the use of
Earmarked Reserves
Annual
RAG Status
£000 £000  £000 £000 % £000 £000
Transport, Fleet & Maintenance Services 0 386 0 0 0% 0 0 
Roads Services 2,647 929 2,540 (107) -4% 0 (107) 
Outdoor Services 270 32 283 13 5% 0 13 
Burial Grounds (87) 35 (19) 68 -79% 0 68 
Crematorium (957) (123) (906) 51 -5% 0 51 
Waste Services 11,059 1,428 11,220 161 1% 0 161 
Depots 0 139 0 0 0% 0 0 
Ground Maintenance & Street Cleaning 5,023 1,998 5,190 168 3% 0 168 
Shared Prosperity Fund 0 164 809 809 0% 809 (0) 
Working 4 U 1,706 708 2,160 454 27% 454 0 
19,661 5,696 21,278 1,617 8% 1,263 354 
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure
Page 247

Page 248

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
HOUSING AND EMPLOYABILITY
PERIOD END DATE 30 June 2026
Total
Budget
Spend to
Date
Projected
Spend
Use of
Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
Annual
RAG Status
£000 £000 £000 £000 % £000 £000
Homelessness Services 925 37 630 (295) -32% 0 (295) 
Resettlement Services 0 105 201 201 0% 0 201 
Private Sector Housing 16 4 16 0 0% 0 0 
Private Sector Housing Grant 48 13 47 (1) -2% 0 (1) 
Energy Efficiency Scotland Area Based Scheme 0 0 0 0 0% 0 0 
Anti Social Behaviour & CCTV 298 71 276 (22) -7% 0 (22) 
1,287 230 1,170 (117) -9% 0 (117) 
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 248

Page 249

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2026/27
MISCELLANEOUS
PERIOD END DATE 30 June 2026
Total
Budget
Spend to
Date 
Projected
Spend
Use of Earmarked
Reserves
Variance after the use
of Earmarked
Reserves
Annual
RAG Status
£000 £000  £000 £000 % £000 £000
7,069 2,196         7,440        371 5% 401 (30) 
1,347 296            1,347        0 0% 0 0 
8,416 2,492         8,787        371 4% 401 (30) 
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
Service Summary
Sundry Services
Page 249

Page 250

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Projected Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
Finance 1,727 1,806 0 80 5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Legal Services/Trading Standards 877 812 0 (65) -7% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Information Services 5,414 5,479 0 65 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Central Administration Support 3,110 3,230 0 120 4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
An adverse variance is shown within employee costs, as a result of the annual turnover target not being
achieved.
Overall, the WDC turnover target is expected to be achieved, consistent with previous years.
Adverse variance
£74k adverse employee costs due to turnover savings currently forecast to be below target.
£45k adverse variance arising from increased postage costs . Outsourced printing budget centralised in
CAS for FY27. Mitigating actions, including reducing postal notifications, have already been
implemented; however, the service continues to face an ongoing cost pressure of £45k based on FY26
spend.
Overall, the WDC turnover target is expected to be achieved, consistent with previous years.
Adverse variance
This service area provides general ICT support to the Council and also supports transformational
change and modernisation of working practices through technology.
People & Technology
None required.
Favourable Variance
The service provided by this area deals with Accountancy, Capital, Treasury, Reconciliations and Cash
An adverse variance is shown within employee costs, as a result of the annual turnover target not being
achieved.
Achieving the turnover target is dependent on employees vacating their posts. As such there is no
specific action that can be taken to ensure the target is achieved. In the event that any vacancies do
arise consideration will be given to delaying recruitment to help achieve the turnover target.
Adverse variance
30 June 2026
Budget Details
Resources
Variance Analysis
RAG Status
Regulatory and Regeneration
This services provides legal advice to the Council.
The main reason for this favourable variance is due to the current level of vacancies within the service
(£96k), partially off-set by sequestration income being lower than anticipated (£26k). The remaining
variance (£5k) is due to various small adverse variances across the service area.
This services deals with administration functions within the Authority.
Page 250

Page 251

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Projected Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
30 June 2026
Budget Details
Variance Analysis
RAG Status
Primary Schools 35,783 36,386 0 603 2% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Secondary Schools 36,670 37,188 0 519 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Early Education 21,451 21,706 0 255 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
PPP 13,929 13,833 0 (96) -1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Central Admin 948 969 100 (79) -8% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service area includes Vale of Leven, Clydebank High and St Peter the Apostle High Schools and St
Eunan's Primary School. The costs charged to this service are Property costs and the Unitary charge.
The favourable variance is due to an underspend on utility costs.
none necessary
This service area covers Education Directorate
The favourable variance is due to underspends on general supplies & services as well as lower Free
School Meal holiday payments caused by a continued reduction in pupil numbers.
none necessary
favourable variance
favourable variance
This adverse variance against employee costs (£394k) is a result of the turnover target not being
achieved. This is partly offset by lower property costs (£56k) and greater income (£88k) particularly from
pre-entitlement hours .
none possible
adverse variance
This service area includes all Primary Schools.
There is a projected employee cost overspend of £565k, primarily due to the increased requirement for
cover arrangements associated with long-term teaching staff absences. SPT bus contracts have come
in higher than budget (£56k).There are some minor favourable variances across property costs.
Wider action on long-term sickness management being enhanced further
adverse variance
This service area includes all Secondary Schools.
There is a projected employee cost overspend of £287k, primarily due to the increased requirement for
cover arrangements associated with long-term teaching staff absences. SPT bus contracts have come
in higher than budget (£122k). The balance of the adverse variance is largely attributable to turnover not
being achieved and miscellaneous variances across the service.
Wider action on long-term sickness management being enhanced further
adverse variance
This services area includes all Early Years establishments within West Dunbartonshire.
Education , Learning and Attainment
Page 251

Page 252

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Projected Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
30 June 2026
Budget Details
Variance Analysis
RAG Status
Education Development 2,509 2,426 0 (83) -3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Roads Services 2,647 2,540 0 (107) -4% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Burial Grounds (87) (19) 0 68 -79% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Crematorium (957) (906) 0 51 -5% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
This service provides burial services within the Council area
The service is forecasting an overspend of £68k. £30k within employee costs due to turnover savings
not being achieved and £38k in income due to the number of burials anticipated. 
The number of burials may change throughout the year and the anticipated outcome will be updated
accordingly. The service will continue to monitor and review all other areas of expenditure.
An overspend is anticipated at the year end.
This service provides crematorium services within the Council area
There is a projected overspend on employee costs partly due to not achieving turnover and partly due to
the reintroduction of Saturday openings for cremations. There is also a forecast under recovery in
income of £46k due to the number of cremations being lower than budgeted.
The number of cremations may change throughout the year and the anticipated outcome will be
updated accordingly. The service will continue to monitor and review all other areas of expenditure.
Overspend anticipated.
This service relates to Roads operations, design, structures, street lighting, road safety and school
crossing patrols
Employee costs are expected to underspend by £71k due to current levels of vacancies within the
service. Rates within property costs are higher than budgeted resulting in an overspend of £42k and
transport and plant is showing an overspend of £59k mainly due to the anticipated internal fleet
maintenance charge for vehicles operated by the service. Street lighting within supplies and services is
expected to underspend by £170k, which is due to previous reductions in the cost of electricity after
budgets were allocated and agreed. The remaining £33k is due to various small variances across the
service.
The service will continue to monitor all spend across the service.
Underspend
This service includes spend in areas such as technician service, language programmes and senior
phase programme.
The favourable variance is due to an underspend on employee costs
none necessary
favourable variance
Roads and Neighbourhood
Page 252

Page 253

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Projected Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
30 June 2026
Budget Details
Variance Analysis
RAG Status
Waste Services 11,059 11,220 0 161 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Ground Maintenance & Street Cleaning 5,023 5,190 0 168 3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Homelessness Services 925 630 0 (295) -32% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Resettlement Services 0 201 0 201 0% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The service supports refugees to settle and integrate within local communities.
Grant funding is dependent on the number of individuals settling within the area. The early forecast is for
service expenditure to exceed grant funding by £200,000.
Maximise grant income through successful claims to UK and Scottish governments.
Year end overspend.
The Service will continue to monitor and review costs and reduce overspends as appropriate.
An overspend is anticipated
Provision of grounds maintenance and street cleaning services.
Staff costs are showing an overspend of £24k due to full turnover not being fully achieved. It is projected
that property costs will overspend by £32k mainly due to utility costs and water rates being higher than
anticipated. Income is showing an under recover by £121k due to a reduction in the level of works that
will be undertaken in 2026/27. The remaining £9k is due to an underspend on supplies and services.
Housing and Employability
The service seeks to prevent homelessness occurring across the authority and improves access to
support services.
Vacant posts across the service will deliver an employee cost underspend.
None
A year end underspend
Waste Collection and Refuse disposal services
Employee costs are projected to be overspent by £257k mainly due to turnover savings not being met.
Supplies and services are expected to underspend by £79k mainly due to tonnage costs for waste
disposal being lower than budgeted and income is showing an over recovery of £42k due mainly due
the sale of additional brown bin permits.  The remaining £25k is due to various small adverse variances
across the service.
The Service will continue to monitor and review costs and reduce overspends as appropriate.
Overspend anticipated.
Page 253

Page 254

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Projected Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
30 June 2026
Budget Details
Variance Analysis
RAG Status
Loan Charges 22,958 23,558 0 600 3% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Non GAE Allocation (7,623) (8,100) 0 (477) 6% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
Interest and other charges on council borrowing
Loan charges are projected to be higher than budget due to interest rates continuing to increase at a
faster rate than forecast as a result of the current economic climate.
None possible at present
Year end overspend is anticipated
Other
The central support allocation was reviewed as part of the 2025/26 year-end process, and the budget
was reduced before the review had been fully concluded.  The projection now reflects the outcome.
None
Underspend anticipated
This budget represents the recharge of central support services to non GAE services ie HRA and
capital
Page 254

Page 255

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2026/27 BY CHIEF OFFICER
SERVICE  Revised 26/27
Estimate 
26/27 Actual
Spend 
26/27 Probable
Outurn 
To be carried
forward into
27/28 
Description 
£  £  £  £
1 Intromissions 147,000             401,000             200,000-             347,000              Build up of reserve to pay for future liability for historic child abuse cases (as
agreed at Council october 2024). Top up 26/27 £200k    
2 Regulatory - New document management system 30,430               30,430               30,430               -                      The Planning and Building Standards require a new document management
system to replace the current system. The current timeline is to procure over two
years due to the different stages in the process and the time needed to undertake
them. 
3 Developer Contributions 222,455             222,455             -                      These are financial or in-kind contributions received from developers and are
associated with specific agreements. They need to be retained and used for the
purposes specified in the individual agreements.    
4 Energy Efficiency 325,000             325,000             -                     A number of projects have been identified as follows: implementation of heat
recovery strategy at Clydebank Crematorium, replacement of heating valves at St
Mary's PS Duntocher, Replacement of controls at Kilbowie ELC, Boiler
Replacements and upgrading of controls at Kilbowie Primary and OHR, Lighting
upgrades at BAM schools and other sites.
5 OD & Change Training Budget 8,773                 8,773                 -                      Funding allocated to meet defined training needs expect to spend Q3/Q4    
6 Previous provision for equal pay/holiday pay 179,591             270                    179,591              Balance for outstanding equal pay/holiday pay claims and associated legal
expenses.
RESOURCES
REGULATORY & REGENERATION
PEOPLE & TECHNOLOGY
Page 255

Page 256

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2026/27 BY CHIEF OFFICER
SERVICE  Revised 26/27
Estimate 
26/27 Actual
Spend 
26/27 Probable
Outurn 
To be carried
forward into
27/28 
Description 
£  £  £  £
7 Modern Apprentice 106,581             106,581             -                     The Balance will be used as part of the four year modern apprenticeship
programme to cover payment across financial years.   The funding will be fully
utilised in year five of the programme.           
8 Employability 442,000             221,000             221,000             This fund will be used for the development and delivery of key employability
initiatives to support vulnerable groups allowing for continued support over a
longer period of time.
9 Community Renewal Fund 9,220                 9,220                 -                     The balance will be used to cover premises costs at the Levengrove Training Centre
and aligns with the Community Renewal Fund priorities; to ensure the continued
delivery of Project Search. A specialist employability programme for young people
with autism and/or learning disabilities. Secure, appropriate, and fully‑equipped
premises are essential for delivering the intensive, on‑site training, employer
engagement, and workplace readiness activities that underpin the Project Search
model.
10 UK Shared Prosperity 808,895             808,895             -                     The fund represents the UKSPF Grant allocation 25/26. The carry forward has been
applied under fund flexibility extention rules to enable the completion of UKSPF
outcomes up until the new programme end date of September 2026.
11 UKSPF community grants 2,641                 2,641                 -                     Community Benefit grants are donations made to W4U for activities/items
selected from WDC wishlist as detailed on WDC webpage.  Funds are for specific
items of expenditure and do not relate to general revenue items of WDC. There is
no restriction that donations have to be spent within the financial year.
12 Extended Producer Responsibility 675,000             675,000             This fund will be used to deliver future recycling initiatives
ROADS & NEIGHBOURHOOD
Page 256

Page 257

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2026/27 BY CHIEF OFFICER
SERVICE  Revised 26/27
Estimate 
26/27 Actual
Spend 
26/27 Probable
Outurn 
To be carried
forward into
27/28 
Description 
£  £  £  £
13 Refugee Resettlement 499,255             499,255              EMR to be used to cover resettlement costs in future years if there is a timing
difference between expenditure and Scottish Government grant income.
14 Empty Home 150,000             150,000              EMR to be used to provide interest free or low interest loans to property owners
to renovate or bring their empty properties back into use, for sale of rental. 
15 CCTV Network Upgrade 21,000               21,000                Contribution for the costs of the CCTV project.
16 Set up a an energy Household Energy Support Fund using
£250,000
3,425                 3,425                 -                      Fund set up to support residents who require crisis support to ensure their
properties remain heated.
17 Cost of Living 1: Enhancement to the Schools Summer
Programmed. £100,000 per year for 4 years.
100,283             85,916               100,283             -                      Balance from £100k to be used to cover holiday activities outwith summer period
(as reported to Education Committee Sept 2025)
18 Cost of Living 2: Create a 4 year School Meal Cost Hardship Fund
to help families struggling with the cost of living. £60,000 per
year.
9,768                 -                     9,768                  To cover the cost and assist families just above to eligibility threshold for free
school meals who have been unable to pay for a school meal. £50,401 released for
2026/27 budget.
19 Cost of Living 3: Additional Support for Apprenticeships. £50,000
per year for 4 years.
100,000             50,000               50,000                The Apprenticeship Investment Programme being part of a broader programme
which is over a four year period. Payments can cover more than one financial year
and therefore the reserves ensures continuity of the programme.
20 Cost of Living 4: Fund the successful spending on Sport & Leisure
for children during holiday times for the next 4 years. £45,000 per
year.
82,840               10,000               10,000               72,840                Additional payments to WDLT for holiday activities (eg gym and swimming classes)
provided over Easter ,summer and autumn
21 Cost of Living 6: Transitional Funding Support to Y-Sort-It over 4
years. £39,000 per year
39,000               39,000               -                      Transitional funding support for Y-Sort It over a four year period to give them time
to secure external funding.
22 Cost of Living 7: Introduce a programme of creative engagement
and learning focused on supporting people through recovery and
improving wellbeing. £5,000 per year for 4 years.
10,000               10,000               10,000               -                      Reserve will be fully utilitsed in 26/27.
23 Provide 64,000 for family fund day events in 2023/24 and the
following three years (approx 32 events at £2,000 per event)
16,000               -                     16,000                Provision of Family fun days within West Dunbartonshire Council over a four year
period This is year three of the four years and therefore £16k will be carried
forward into 2026/27 to be used.
HOUSING & EMPLOYABILITY
COST OF LIVING
Page 257

Page 258

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2026/27 BY CHIEF OFFICER
SERVICE  Revised 26/27
Estimate 
26/27 Actual
Spend 
26/27 Probable
Outurn 
To be carried
forward into
27/28 
Description 
£  £  £  £
24 Transfer to Foodbank support fund 120,000             120,000             120,000             -                     26/27 Commitment to support foodbanks as approved by Council March 2026
25 £12k over 4 years to Renton Community Food Hub from April
2024 to March 2028 (formerly Tontine Food Parcels)
6,000                 3,000                 3,000                 3,000                  Subsidy provided to food banks over a three year period to assist with the
provision of food parcels.
26 £12k over 4 years to Lomond Food Pantry from April 2024 to
March 2028
6,000                 3,000                 3,000                 3,000                  Subsidy provided to food banks over a three year period to assist with the
provision of food parcels.
27 £12k over 4 years to Time for Tully from April 2024 to March
2028
6,000                 3,000                 3,000                 3,000                  Subsidy provided to food banks over a three year period to assist with the
provision of food parcels.
29 Flourishing  Faifley 1,550                 1,550                 1,550                 -                     Cover the running costs of the group’s ceramics club, enabling it to remain low
cost, promote social inclusion, and help alleviate some of the impacts of the cost
of living crisis.30 Bankie Talk 2,150                 2,150                 2,150                 -                     Providing revenue funding to ease financial pressures and allow them to focus on
future proofing the service.
31 Whitecrook Community action Group 3,000                 3,000                 3,000                 -                     To support families who require assistance, we will provide food parcel service
Whitecrook Community Action Group with £3000 to support the delivery of 200
family (two adults, two children) food parcels. 
32 Glenhead Community Centre, Duntocher 7,000                 7,000                 7,000                 -                     Support towards the costs of  refurbishment  to create a low-cost soft play facility
for families, including a dedicated sensory room. Providing support towards the
cost of the works TOTAL USE OF SERVICE RESERVES          4,140,857              680,316           1,890,403           2,250,454
Page 258

Page 259

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2026/27 BY CHIEF OFFICER
SERVICE  Revised 26/27
Estimate 
26/27 Actual
Spend 
26/27 Probable
Outurn 
To be carried
forward into
27/28 
Description 
£  £  £  £
33 Voluntary Redundancy & Early Retirement Reserve 2,913,897         600,000             2,313,897          Funding for voluntary redundancy and Early retirement linked to 25/26 savings. 
34 Smoothing Fund 1,824,973         54,217               1,770,756         The smoothing fund is being used to offset service overspends where
savings/efficiencies have not been achieved in year.  See Appendix 6 for details of
where the smoothing fund has been applied (£504k).  
35 Reduction in Strathclyde Pension Fund Employer Contribution 9,056,000         5,331,242         5,331,242         3,724,758          Build up of the SPFO saving to be used to balance the budget in future years as
agreed in 2023/24.
36 2026/27 Budgeted use of reserves 911,758             911,758             911,758             -                      As agreed at the budget meeting on 4 March 2026  -reserves to be used to
balance the 2026/27 budget
TOTAL USE OF STRATEGIC RESERVES        14,706,628           6,243,000           6,897,217           7,809,411 
TOTAL USE OF EARMARKED RESERVES         18,847,485           6,923,316           8,787,620         10,059,865
STRATEGIC RESERVES
Page 259

Page 260

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
RECONCILIATION OF GENERAL FUND RESERVES
Unearmarked Balance Earmarked Balance (further detail at Appendix 4)
£(m) £(m) £(m) £(m)
Balance on General Fund as at 31 March 2026 (Unaudited) 25.163 Earmarked as at 31 March 2026 18.847
Other Reserves (0.239)
Closing General Fund Balance 24.924 Operational service use of reserves (1.890)
Less Earmarked Balances (18.847) Use of strategic reserves (0.654)
Unearmarked Balance as at 31 March 2026 (draft) 6.077              Budgeted use of reserves (6.243)
Total Use of Reserves as at Period 3 (8.788)
Forecast favourable/(adverse) service outturn (1.665)
Forecast favourable/(adverse) non service outturn (0.123) Earmarked Balance as at 31 March 2027 10.060
Transfer to/(from) general reserves as at Period 3 (1.788)
Forecast unallocated Balance as at 31 March 2027 4.289
Prudential Target (2.5%) - agreed 4 March 2026 5.510
Forecast unallocated Balance Above/(Below) Prudential
Target (1.221)
Page 260

Page 261

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2026/27
Efficiency Detail Ref Source Chief Officer
Budgeted
Amount      
£000 
Projection of
Total Saved      
£000 
Projection of
Total Not Saved       
£000 Comment
1 Parking Enforcement RN05 Prior yr G Macfarlane 325 175 150
The implementation of DPE commenced in Autumn 2025.  There was a part year income
received in 2025/26. It is not anticipated that the full saving will be achieved due to various
factors inlcuding a change in behaviours wherby drivers are parking legally and fines being paid
at the reduced rate rather than the full rate
2 Office/ Depot Rationalisation SDP05 Prior yr L Slavin 380 176 204
Relates to two properties (Kilbowie Road and Elm road where tenants have yet to be identified.  
24/25 shortfall to be funded from the smoothing fund.  In 2025/26 a full review will be carried
out on rental income and a cost pressure considered for 2026/27.
3 Communities Team RR01 March 2026 Saving A Douglas 42                      42                       -                         Fully Achieved
4 Assistance to Businesses RR08 March 2026 Saving A Douglas 10                      10                       -                         Fully Achieved
5 SECONDMENT TO CLYDEBANK NEIGHBOURHOOD BOARD 2627 RR02 March 2026 Mgt Adj A Douglas 42                      42                       Fully Achieved
6 CAPACITY FUNDING - PLAN FOR NEIGHBOURHOODS 2627 RR03 March 2026 Mgt Adj A Douglas 34                      34                       -                         Fully Achieved
7 PLANNING, ENV HEALTH & BUILDING STANDARDS 2627 RR06 March 2026 Mgt Adj A Douglas 16                      16                       -                         Fully Achieved
8 BUSINESS GATEWAY 2627 RR07 March 2026 Mgt Adj A Douglas 10                      10                       -                         Fully Achieved
9 MERGER OF MANAGER ROLES 2627 RR09 March 2026 Mgt Adj A Douglas 25                      25                       -                         Fully Achieved
10 RR13 - review environmental health RR13 March 2025 Mgt Adjustments A Douglas 7                         7                         Fully Achieved
11 RR17: Reduce Trading Standards team RR17 March 2025 Savings A Douglas 25                      25                       The saving has been achieved in the service through the delay in filling other posts.
12 RR18: Reduce Records Management team RR18 March 2025 Savings A Douglas 41                      41                       Fully Achieved
13 RR19: Close Clydebank Registration Office RR19 March 2025 Savings A Graham 9                         9                         Fully Achieved
14 Review of Contact Centre  CCF03 March 2026 Saving A Graham 15                      15                       -                         Fully Achieved
15 Reduction in Performance and Strategy Team CCF09 March 2026 Saving A Graham 25                      25                       -                         Fully Achieved
16 Reduction in WDLT Management Fee CCF10 March 2026 Saving A Graham 253                    253                     -                         Fully Achieved
17 FM OPERATING MODEL 2627 CCF12 March 2026 Mgt Adj A Graham 250                    250                     -                         Saving anticipated to be achieved
18 DELETION VACANT FM SUPPORT POST 2627 CCF13 March 2026 Mgt Adj A Graham 40                      40                       -                         Fully Achieved
19 CCF18: Reduction in Arts and Heritage Option 1: 1.5 FTE reduction. CCF18 March 2025 Savings A Graham 50                      50                       -                         Fully Achieved
20 CCF04- Review Facilities Mgt Operating Model CCF04 March 2025 Mgt Adjustments A Graham 100                    100                     -                         Saving anticipated to be achieved
21 CCF09: Reduce Contact Centre by 2 FTE - option 2 CCF09 March 2025 Savings A Graham 30                      30                       Fully Achieved
22 Out of School Care Option 1 EDU 09 March 2026 Saving G Hamilton 14                      14                       -                        
23 Instrumental Music Service (IMS):  EDU 12 March 2026 Saving G Hamilton 23                      23                       -                        
24 Senior Phase Transport Option 1 EDU15 March 2026 Saving G Hamilton 44                      44                       -                        
25 Reduction in Management Funding for ELC provision  EDU19 March 2026 Saving G Hamilton 46                      46                       -                        
26 Reduction in Temporary Teaching Posts  EDU20 March 2026 Saving G Hamilton 228                    228                     -                        
27 Roll related Clerical Hour Allocation EDU23 March 2026 Saving G Hamilton 60                      60                       -                        
2023/24 Efficiencies not achieved
2026/27 Efficiencies and Management Adjustments
Page 261

Page 262

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2026/27
Efficiency Detail Ref Source Chief Officer
Budgeted
Amount      
£000 
Projection of
Total Saved      
£000 
Projection of
Total Not Saved       
£000 Comment
28 RIGHT SIZE FREE SCHOOL MEALS ETC 2627 EDU18 March 2026 Mgt Adj G Hamilton 128                    128                     -                        
29 ELC EDUCATION SUPPORT OFFICER POST 2627 EDU24 March 2026 Mgt Adj G Hamilton 18                      18                       -                        
30 EDU25- Redesign Leadership in children, young people and familities team EDU25 Dec 24 Savings Options G Hamilton 21                      21                      
31 EDU16 - Reduce secondary school clerical staff EDU16 March 2025 Mgt Adjustments G Hamilton 40                      40                      
32 2627 EDU01 ASN School Transport 2627 EDU01 Dec 25 G Hamilton 75                      75                      
33 2627 EDU02 School fridges 2627 EDU02 Dec 25 G Hamilton 6                         6                        
34
EDU03: Reduce Education Maintenance Allowance to statutory level and reduce
carers enhancement - Option 3 EDU03 March 2025 Savings G Hamilton 39                      39                      
35 EDU11:Shared Head at two early learning centres (Clydebank and Whitecrook) EDU11 March 2025 Savings G Hamilton 16                      16                      
36
EDU14: Align funding for 1140 hours for 3 year olds with statutory guidance
Option 2 EDU14 March 2025 Savings G Hamilton 74                      74                      
37 EDU20: Remove secondary school registration EDU20 March 2025 Savings G Hamilton 189                    189                    
38 Working4U Restructure Option 2:  RN05 March 2026 Saving G Macfarlane 123                    123                     -                        
This has been achieved and fully implemented with 2 posts deleted from the establishment,
reduction in hours for staff and movement of core funded staff to deliver against externally
funded projects.
39 Crematorium Weekend Operations RN06 March 2026 Saving G Macfarlane 5                         -                      5                             This option has been reversed per Council meeting June 2026
40 Reduce number of Apprentices RN09 March 2026 Saving G Macfarlane 115                    115                     -                         Fully implemented. Reduced number of apprentices recruited
41 Street Sweeping and Litter Collection of Trunk Road  RN11 March 2026 Saving G Macfarlane 50                      50                       -                         Fully implemented. Reduction in service scheduled into plans
42 Purchase of vehicles to replace hire cars RN14 March 2026 Saving G Macfarlane 20                      20                       -                         10 vehicles have been ordered to replace current hire and leased vehicles.
43 SEPARATION OF GARDEN/FOOD WASTE 2627 RN12 March 2026 Mgt Adj G Macfarlane 50                      50                       -                         Awaiting new vehicles and working on contracts.
44 2627 RN02 CCTV upgrade at Depots 2627 RN02 Dec 25 G Macfarlane 80                      80                       This has been achieved and fully implemented
45 Review of Office Accommodation RES04 March 2026 Saving L Slavin 25                      25                       -                        
46 Review Municipal Buildings RES19 March 2026 Saving L Slavin 16                      16                       -                        
47 Review use of depot rental charges RES20 March 2026 Saving L Slavin 75                      75                       -                        
48 2627 RES06 CTAX Debt & Rev and customs pilot 2627 RES06 Dec 25 L Slavin 100                    100                     -                         Fully Achieved
49 2627 RES09 Pat testing costs 2627 RES09 Dec 25 L Slavin 36                      36                       -                        
50 2627 RES11 CTAX income 2627 RES11 Dec 25 L Slavin 250                    250                     Fully Achieved
51 RES 09 - Review of charges for use of offices by external parties RES09 Dec 2024 Savings Options L Slavin 8                         8                         -                        
52 RES05: Review Council Tax and Benefits Service RES05 March 2025 Savings L Slavin 14                      14                       Fully Achieved
53 RES06: Reduce Corporate Debt team RES06 March 2025 Savings L Slavin 23                      23                       Fully Achieved
54 RES08: Reduce number of caretakers RES08 March 2025 Savings L Slavin 8                         8                         Fully Achieved
55 Reduce CCTV Team 25% Option 1 HE02 March 2026 Saving P Barry 14                      14                       -                         Fully Achieved
56 HE04: CCTV Service Reduction Option 2 HE04 March 2025 Savings P Barry 31                      31                       Fully Achieved
57 Reduction in Corporate Training Budget PT11 March 2026 Saving V Rogers 15                      15                       -                         Saving anticipated to be achieved
58 365 LICENCE SAVINGS 2627 PT06 March 2026 Mgt Adj V Rogers 60                      60                       -                         Fully Achieved
59 REDUCE ICT SUPPORT 2627 PT07 March 2026 Mgt Adj V Rogers 32                      32                       -                         Fully Achieved
60
PT08 - Review compliance with strategic operating model to identify areas
where teams or post can be merged PT08
March 2024 Mgt Adjustments -
split equally across all CO V Rogers 50                      50                       -                        
61 EDU25- Redesign Leadership in children, young people and familities team PT08 Dec 24 Savings Options V Rogers 15                      15                       -                        
62 PT14 - People & Change Team Restructure PT08 March 2025 Savings V Rogers 35                      35                       -                        
63 2627 PT04 CAS Team Leader 2627 PT04 Dec 25 V Rogers 49                      49                       Fully Achieved
64 2627 PT05 ICT SOM Compliance 2627 PT05 Dec 25 V Rogers 31                      31                       Fully Achieved
65 PT18: Outsource  Print Room function PT18 March 2025 Savings V Rogers 25                      25                       Staff reductions fully achieved
TOTAL AGREED SAVINGS OPTIONS & MANAGEMENT ADJUSTMENTS 4,105                 3,746                 359                       
Page 262

Page 263

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council: 21 July 2026
_________________________________________________________________ 
Subject:  General Services Capital Budgetary Control Report 2026/27 to
30 June 2026 (Period 3) 
1. Purpose 
1.1 This report provides an update on the General Services capital financial
performance to 30 June 2026. 
2. Recommendations 
2.1 Members are asked to: 
a) Note the current position of the 2026/27 General Services capital budget. 
b) Approve the revised completion dates in respect of 3 projects detailed in
Appendix 2 and note an overspend in 1 project which currently does not
require additional capital funding. 
c) Approve the reprofiling of 8 projects in Appendix 3 of (£4.152m) over the
project life. 
d) Approve £0.576m of additional capital budget for vehicle replacement
strategy (Para 4.9). 
3. Background 
3.1 On 4 March 2026 the Council approved the updated General Services Capital
Plan for 2026/2027 to 2035/36. The three years from 2026/27 to 2028/29
were approved in detail with the remaining years being indicative. The budget
agreed was £56.181m for 2026/27 and £352.768m for the project life budget. 
4. Main Issues 
4.1 Exhibit 1 sets out the revised capital budget at period 3 assuming approval by
Council of all recommendations contained within this report. 
Exhibit 1: Revised Capital Budget as at 30 June 2026. 
2026/27
(£m)
Project Life
(£m)
Capital Budget Agreed 4 March 2026 56.181 352.768
Changes to capital budget reported on P12 Capital
BCR to Council on 17 June 2026 (Para 4.7)
11.089 (0.034)
New Funding – RR 14 Scottish Marine Technology
Park (Para 4.8)
4.229 4.229
ITEM 13
Page 263

Page 264

New Funding – RR 15 Clydebank Pride in Place
Regeneration Plan (Para 4.8)
0.360 14.936
Additional budget – RN24 Exxon City Deal (Para
4.8)
0 1.000
Recurring Projects – project life removed (Para
4.8)
0 (15.925)
Adjustments to project lives (Para 4.8) (0.240) (7.397)
RN 25 Active Travel (Para 4.8) 0.735 0.735
RN 34 Nature Restoration Fund (Para 4.8) 0.065 0.065
RN 39 Milton Park MUGA (Para 4.8) 0.021 0.021
Approved Capital Bid – Vehicle Replacement
Strategy (Para 4.9) (Added to RN 5)
0.576 0.576
Proposed revised Capital Budget as at Period 3  73.016 350.974
Reprofiling over project life (Appendix 3) (4.152) 0
Proposed revised Capital Budget as at Period 3
subject to Council Approval
68.864 350.974 
4.2  Progress against the 2026/27 capital plan is detailed in: 
Appendix 1 – Project Life Summary by Chief Officer 
Appendix 2 – Off Track Projects 
Appendix 3 – Changes to Capital Plan for Noting 
Appendix 4 – All Approved Projects 
4.3 The overall programme summary report at Appendix 1 shows that planned
expenditure against the budget is currently £0.223m adverse. Note
Appendix 1 is constructed assuming all the changes in this report are
approved. 
4.4 Appendix 2 highlights 4 projects currently showing as off-track. Three of
which are due to revised completion dates and one due to an overspend. 
• Place Based Investment (RR 6) is off track due to project development
taking longer than originally anticipated. 
• The Scottish Marine Technology Park (RR 14) is off track due to
reprofiling to align with the initial assumption when the funding was
awarded. 
• Allotment Development (RN 16) is off track as £0.468m was spent prior
to 2026/27 with a £0.024m budget in 2026/27 however at period 3
£0.109m has been spent in 2026/27. Based on the information
available from the quantity surveyor an additional £0.223m is required
to complete the allotments under development. The service is aware of
this overspend however are not requesting additional capital funding at
this point and will report to Council in the period 5 BCR in October how
this overspend will be funded and managed. Early indications are that
the Shared Prosperity Funding will be used to cover this overspend. 
Page 264

Page 265

• Free School Meals Expansion (EDUC 5) is off track due to the
complexity of delivering works within an operational school
environment. 
4.5  Appendix 3 highlights 8 projects where the expenditure requires to be
reprofiled across the project life but there is no need for additional budget. 
4.6 Appendix 4 shows all projects with approved in year and project life budgets
as well as anticipated expenditure. It highlights that the 2026/27 budget is
£73.016m. Spend as at period 3 is £5.707m (8.26%) of the current forecast
spend of £69.086m. 
4.7  Changes applied from the Period 12 Capital Budgetary Report approved at
Council on 17 June 2026. 
4.8 Other changes to the capital plan included in the summarised plan in
appendix 4 are: 
• New Regeneration Capital Grant Funding for Scottish Marine Technology
Park (RR 14) of £4.229m. 
• New funding for Clydebank Pride in Place Plan (RR 15) of £0.360m in
2026/2027 and future funding of £14.576m. 
• Increase in capital budget for Exxon City Deal (RN 24) as agreed by
Council on 29 April 2026 of £1.000m. 
• Removal of the recurring budgets for 2025/26 of £15.925m. 
• Adjustments to the project life income and expenditure for Faifley Campus
of £7.397m as the income and associated expenditure is being accounted
for on a revenue basis as per the funding agreement from Scottish
Government. 
• New funding for Active Travel (RN 25) of £0.735m from the Scottish
Government. 
• New funding for Nature Restoration Fund (RN 34) of £0.065m from the
Scottish Government. 
• Additional funding for Milton Park MUGA (RN 39) of £0.021m from Scottish
Landfill Tax. 
4.9  Members are asked to approve a capital budget of £0.576m for the vehicle
replacement strategy. 
This bid has been reviewed by the Strategy Asset Management Group who
recommend that £0.576m is added to the Capital plan to allow the Roads and
Neighbourhood team to replace plant and machinery which is no longer fit for
purpose. There will be an annual revenue impact of £0.100m on loan charges
for 7 years due to the repayment of the principal and the interest.
Page 265

Page 266

This project has been included in appendix 4 (RN 5). 
4.10 Play Area Upgrade Programme recurring budget (RN 18) is showing
(£0.067m) in the unallocated line, this has been raised with the service to
review and will provide an update in the period 5 to BCR to Council in
October. 
Updated cost estimates indicate increased expenditure requirements
associated with destination play parks and additional sites progressed through
the programme. The service is reviewing the overall programme budget and
external funding position and will return through a future BCR cycle with any
budget realignment required to align approved budgets with the latest project
costs and delivery programme. 
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the projected financial position for capital budgets. 
8. Risk Analysis 
8.1  The main risks are as follows: 
(a) As a consequence of current market conditions, inflation is high and interest
rates continue to be volatile. To forecast for the full capital plan costs budget
assumptions have been required. These assumptions continue to change
regularly and therefore it is likely the projected capital plan budgetary position
will change from that reported. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report. 
11. Consultation 
11.1 All services involved in delivering the capital budgets have been consulted in
the compilation of this report. 
Page 266

Page 267

12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council. 
______________
Laurence Slavin
Chief Officer – Resources
Date: 27 July 2026 
Person to Contact:  Lynsey Dickson, Finance Business Partner  
Council Offices, Church Street, Dumbarton   
E-mail: lynsey.dickson@west-dunbarton.gov.uk 
Appendices:  Appendix 1 – Project Life Summary by Chief Officer
Appendix 2 – Off Track Projects 
Appendix 3 – Changed to Capital Plan for Noting
Appendix 4 – All Approved Projects 
Background Papers:    General Services Capital Plan Update - Council 4 March
2026
Capital Budgetary Control Report (P12) – Council 17
June 2026 
Wards Affected:  All Wards 
Page 267

Page 268

Official#
West Dunbartonshire Council Appendix 1
General Services Capital 2026/27
Summary at Period 3
Project Life
Budget
Project Life
Forecast
Spend
Project Life
Variance On Track Off Track
£'000 £'000 £'000
Resources 55,737             55,738            0 14 0
Regulatory and Regeneration 65,894             65,894            0 6 2
Roads and Neighbourhoods 150,347           150,570          223 25 0
Education 60,543             60,543            0 3 1
HSCP 8,683               8,683              0 3 0
People and Technology 9,769               9,769              0 5 0
Total 350,974           351,197          223 56 3
Page 268

Page 269

Official#
West Dunbartonshire Council Appendix 2
General Services Capital 2026/27
Projects that are Off Track at Period 3
Service Project
Approved Project Life
Cost
Revised Project
Life Cost
Project Life
Variance
Initial Completion
Date
Revised
Completion Date
£000 £000 £000
Regulatory and Regeneration RR 6 - Place Based Investment                                     675                         675                  -   31/03/2027 31/03/2028
Regulatory and Regeneration RR 14 - The Scottish Marine Technology Park                                  4,229                      4,229                  -   31/03/2027 31/03/2028
Roads and Neighbourhood RN 16 - Allotment Development                                     492                         715               223 31/03/2028 31/03/2028
Education EDUC 5 - Free School Meals Expansion                                  1,265                      1,265                  -   31/03/2027 31/03/2028
Project Name: Place Based Investment Project Manager: Magda Swider
Initial Completion End Date: 31/03/2027 Revised End Date: 31/03/2028
How was this project initially funded: Please Detail any additional funding:
Place Based investment Programme funding (PBIP) from the Scottish Goverment
Why is the project classified as off track and what has caused the issues identified?
What action will be taken to rectify the position?
There is no requirement to take any action
What are the implications on the actions proposed?
Revenue Implications:-
Virement Implications:- no implications
Project Name: The Scottish Marine Technology Park Project Manager: Magda Swider
Initial Completion End Date: 31/03/2027 Revised End Date: 31/03/2028
How was this project initially funded: Please Detail any additional funding:
Why is the project classified as off track and what has caused the issues identified?
What action will be taken to rectify the position?
There is no requirement to take any action
What are the implications on the actions proposed?
Revenue Implications:-
Virement Implications:- no implications
no implications
Part of the funding is allocated to Alexandria Main Street/Mitchell Way project which is due to start on site in early 2027. Project development has taken longer than originally anticipated.
Source of Funding:
no implications
Regeneration Capital Grant Fund (RCGF) funding from the Scottish Government, for Malin to deliver remediation of the former Carless oil Terminal site.  This reprofiing alligns with the initial assumption made when the
funding was awarded.
Source of Funding:
Regeneration Capital Grant Fund (RCGF) funding from the Scottish Government, for Malin to deliver remediation of the former Carless oil Terminal site.  This reprofiing alligns with the initial assumption made when the
funding was awarded.
Page 269

Page 270

Official#
Project Name: Allotment Development Project Manager: Ian Bain
Initial Completion End Date: 31/03/2028 Revised End Date:
How was this project initially funded: Please Detail any additional funding:
Prudential Borrowing
Why is the project classified as off track and what has caused the issues identified?
What action will be taken to rectify the position?
What are the implications on the actions proposed?
Revenue Implications:-
Virement Implications:-
Project Name: Free School Meals Expansion Project Manager: Michelle Lynn
Initial Completion End Date: 31/03/2027 Revised End Date: 31/03/2028
How was this project initially funded: Please Detail any additional funding:
Prudential Borrowing
Why is the project classified as off track and what has caused the issues identified?
What action will be taken to rectify the position?
There is no requirement to take any action
What are the implications on the actions proposed?
Revenue Implications:-
Virement Implications:- no implications
This budget is proposed to be rephased to 2027/28. Planning permission has been secured and the project is progressing through detailed design, building warrant approvals and site investigations. Due to the
complexity of delivering works within an operational school environment, including the need to minimise disruption to pupils and staff, the construction programme and associated expenditure are now expected to fall
predominantly within 2027/28. The rephasing aligns the budget with the revised delivery programme and anticipated expenditure profile.
Source of Funding:
no implications
Additional project life expenditure of £223k is required, comprising £205k of increased project costs and £18k of associated expenditure adjustments identified through the latest Budgetary Control Review.
Corresponding adjustments have been made to ensure the project budget accurately reflects the anticipated outturn and full life cost of the project.
Source of Funding:
Currently no implications as no additional capital funding is being requested.
Currently no implications as no additional capital funding is being requested.
There are ongoing enquiries with the service over how this overspend has to be managed and funded with an update being brought to Council in the P5 Capital BCR in October. Early indications are that Shared
Prosperity Funding will be used to cover this overspend.
Page 270

Page 271

Official#
West Dunbartonshire Council Appendix 3
General Services Capital 2026/27
Changes to Capital Plan and Implications at P3
Project - RR 4 - Regeneration/Local Economic Development Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  2034/35  2035/36  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
RR 4 Regeneration/Local Economic Development (unallocated) 15 0 0 0 475 475 475 475 475 475                       2,865
RR 4a Dumbarton Visitor Gateway/Arc of Attractions 100 100 50                          250 
Dumbarton Waterfront Walkway - consultancy & delivery 250 550                          800
Dumbarton High Street and Town Centre revitalisation 222 137 200                          559
RR 4b Alexandria - Alexander Street fees 101                          101 
Alexandria - Mitchell Way & Main Street improvements 800                          800 
Alexandria - Mitchell Way - gas pipe relocation 88                            88
RR 4e Balloch Pierhead Action Plan 311 83                          394                       
5,857
RR 4 Regeneration/Local Economic Development (unallocated) Revised 31/03/2027 31/03/2027 1,234 0 0 0 0 475 475 475 475 475 475                       2,850
RR 4a Dumbarton Visitor Gateway/Arc of Attractions Revised 20 100 80 50                          250 
Dumbarton Waterfront Walkway - consultancy & delivery Revised 10 240 550                          800
Dumbarton High Street and Town Centre revitalisation Revised 222 88 0                          310
RR 4b Alexandria - Alexander Street fees Revised 101 15                          116 
Alexandria - Mitchell Way & Main Street improvements Revised 800                          800 
Alexandria - Mitchell Way - gas pipe relocation Revised 88                            88
RR 4e Balloch Pierhead Action Plan Revised 50 344 249                          643                       
5,857
Explanation
Project - RR 6 - Place Based Investment Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  2034/35  2035/36  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
RR 6 - Place Based Investment 675                          675 
Revised 31/03/2026 31/03/2028 210 465 210                          675
Explanation
Project - RR 14 - The Scottish Marine Technology Park Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  2034/35  2035/36  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
RR 14 - The Scottish Marine Technology Park 4,299 0                       4,299 
Revised 31/03/2027 31/03/2028 1,500 2,799 1,500                       4,299
Explanation
Project - RR 15 - Clydebank Pride in Place Regeneration Plan Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
RR15 - Clydebank Pride in Place Regeneration Plan 360                          360 
Revised 31/03/2026 31/03/2027 260 100 260                          360
Explanation
Project - EDUC 5 - Free School Meals Expansion Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
EDUC 5 - Free School Meals Expansion 1,185                       1,185 
Revised 31/03/2027 31/03/2028 1,000 185 1,000                       1,185
Explanation
Delivery of projects re-profiled to allow sufficient time for project development and procurement with budgets updated to reflect updated cost estimates.Project development of the Alexandria Main Street/Mitchell Way improvements has taken longer than originally anticipated. Progress with the delivery of the walkway is slower than anticipated and
relies on cooperation with the landowners. Delivery of the Dumbarton Visitor Gateway/Arc of Attractions re-profiled to allow sufficient time for Council wide Tourism Strategy to be developed.Development of Balloch Pierhead project would be scheduled for 2027/28 and is subject to a future approval. This is a reallocation and re-profiling of the recurring
budget for Regeneration/Local Economic Development which is now being split out and monitored.
Place Based investment Programme funding (PBIP) is a non-competitive funding from the Scottish Government.Part of the funding is allocated to Alexandria Main Street/Mitchell Way project which is due to start on site in early 2027. Project development has taken longer than originally anticipated.
Regeneration Capital Grant Fund (RCGF) funding from the Scottish Government, for Malin to deliver remediation of the former Carless oil Terminal site.  This reprofiing alligns with the initial assumption made when the funding was awarded.
Financial Year 2026/27 is a project development year, and only  limited spend is expected on delivery. This is in line with the spend profile included in the Regeneration Plan and approved by the UK Government.  Reprofiling of the funding is acceptable under the funding terms & conditions and this alligns budget with the initial assumption made when
the funding was awarded.
This budget is proposed to be rephased to 2027/28. Planning permission has been secured and the project is progressing through detailed design, building warrant approvals and site investigations. Due to the complexity of delivering works within an operational school environment, including the need to minimise disruption to pupils and staff, the
construction programme and associated expenditure are now expected to fall predominantly within 2027/28. The rephasing aligns the budget with the revised delivery programme and anticipated expenditure profile.
Page 271

Page 272

Official#
Project - HSCP 2 - ICT Modernisation HSCP Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  2034/35  2035/36  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
HSCP 2 ICT Modernisation HSCP (unallocated) 72 0 0 0 0 90 87 80 90 90                          509
HSCP 2a Life Lens 13                            13
HSCP 2b Magic Notes 48                            48
HSCP 2c Staffing 45 46 48 49 50                          238
HSCP 2d ICT Device 5 5 5 5 5                            25
HSCP 2f Digital Inclusion (Prevention, Early Intervention, DCE) 10 10 10 10 10                            50
HSCP 2g Digital Telecare (AICO project, tec hub, new technology) 13 49 10                            72
HSCP 2h HSCP Systems/Applications (new applications, scripts, automation, data utilisation) 25 49 27 26 25                          152                       
1,107
HSCP 2 ICT Modernisation HSCP (unallocated) Revised 31/03/2027 31/03/2027 72 0 0 0 0 0 0 0 0 0 0                             -  
HSCP 2a Life Lens Revised 13                            13
HSCP 2b Magic Notes Revised 0                             -  
HSCP 2c Staffing Revised 45 46 48 49 50 52 53 55 56 58                          511
HSCP 2d ICT Device Revised 5 5 5 5 5 5 5 5 5 5                            50
HSCP 2f Digital Inclusion (Prevention, Early Intervention, DCE) Revised 10 10 10 10 10 10 10 10 10 10                          100
HSCP 2g Digital Telecare (AICO project, tec hub, new technology) Revised 13 15 15 15 14 14 14 5 14 14                          133
HSCP 2h HSCP Systems/Applications (new applications, scripts, automation, data utilisation) Revised 25 49 27 26 25 10 5 5 5 3                          180
HSCP 2i Granicus Blue Badge 13                            13
HSCP 2j Website Development 48 18 20 21                          107                       
1,107
Explanation
Project - HSCP 3 - Community Alarm upgrade Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  2034/35  2035/36  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
Community Alarm upgrade 55 4 0 0 42 42 0 0 0 0                          143 
Revised Community Alarm Upgrade 31/03/2031 31/03/2031 (4) 59 0 0 0 42 42 0 0 0 0                          143
Explanation
Project - P&T 1 - ICT Modernisation Initial End Date  Revised End Date Reprofiling Current Year  2027/28  2028/29  2029/30  2030/31  2031/32  2032/33  2033/34  2034/35  2035/36  Total Capital Plan
£'000 £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000  £'000
P&T 1 ICT Modernisation (unallocated) (153) 122 0 0 0 0 0 120 436 436                          961
P&T 1e Laptops for Corporate Employees 200 97 161 175 100 30 90 97                          950                       
1,911
P&T 1 ICT Modernisation (unallocated) Revised 31/03/2027 31/03/2027 (120) 0 122 0 0 0 0 0 0 436 436                          994
P&T 1e Laptops for Corporate Employees Revised 47 97 161 175 100 30 90 97                          797
P&T 1i Microsoft 365 Implementation Revised 120                          120                       
1,911
Explanation
Revised cost estimates for the Microsoft 365 programme reflect expanded scope to include CoPilot, increased Sharegate licensing requirements, and additional technical complexity and costs not fully anticipated in the original plan.
Additional budget is therefore required to ensure full delivery of the intended milestones. This is a reallocation and re-profiling of the recurring budget for ICT Modernisation which is now being split out and monitored.
Reprofiling is required due to ongoing work to roll out the digital strategy and a review of priorities. This is a reallocation and re-profiling of the recurring budget for ICT Modernisation HSCP which is now being split out and monitored.
Reprofiling is required to consolidate the 2026/27 budget with the small balancing budget from 2027/28.
Page 272

Page 273

Official#
Appendix 4
All Projects Approved at P3
RES Project Completion
Date
Revised End
Date
Project Life
Budget
Spend to
31/03/2026
Spend
Projected in
Current
Year
Projecte
d Future
Spend
Total
Projected
Spend
Project
Variance
Approved
Budget
2026/27
Actual to date
2026/27
Projected
Spend
In Year
Variance
£000 £'000  £'000  £'000  £'000 £'000 £'000 £'000 £'000
RES 1 Valuation Joint Board - Requisition of ICT Equipment 31/03/2028 31/03/2028 30 20 3 6 30 0 3 0 3 0
RES 2 Agresso Development 31/03/2027 31/03/2027 92 88 4 0 92 0 4 0 4 0
RES 4 Community Success Capital Fund 31/03/2027 31/03/2027 150 0 150 0 150 0 150 0 150 0
RES 5 Community Sports Success 31/03/2027 31/03/2027 250 54 196 0 250 0 196 0 196 0
RES 6 Dumbarton Library, Strathleven Place 31/03/2027 31/03/2027 1,590 0 1,590 0 1,590 0 1,590 0 1,590 0
RES 7 New Sports Changing Facility Dumbarton West (Old OLSP site)  31/03/2027 31/03/2027 349 18 331 0 349 0 331 (8) 331 0
RES 8 Building Upgrades and H&S - lifecycle & reactive building upgrades
(unallocated) 31/03/2027 31/03/2027 13,380 0 0 13,380 13,380 0 0 0 0 0
RES 8a Whitecrook PS Cunard Condition Survey Works 31/03/2027 31/03/2027 368 0 368 0 368 0 368 0 368 0
RES 8c Fire Risk Works 31/03/2031 31/03/2031 1,750 0 350 1,400 1,750 0 350 (5) 350 0
RES 8d Health & Safety - For Works Arising 31/03/2031 31/03/2031 750 0 150 600 750 0 150 0 150 0
RES 8e ASN Adaptations 31/03/2031 31/03/2031 125 0 25 100 125 0 25 0 25 0
RES 8f Signalling/Monitoring for Alarms 31/03/2031 31/03/2031 200 0 40 160 200 0 40 0 40 0
RES 8i Knoxland Primary School - condition survey works 31/03/2027 31/03/2027 187 0 187 0 187 0 187 0 187 0
RES 8y Balloch Castle - Upgrade Windows & all required surveys 31/03/2027 31/03/2027 392 0 392 0 392 0 392 2 392 0
RES 8z Argyle Park bothy refurb 31/03/2027 31/03/2027 157 0 157 0 157 0 157 0 157 0
RES 8aa Vale Cemetary Bothy 31/03/2027 31/03/2027 53 0 53 0 53 0 53 0 53 0
RES 8ab Christie Park Workshop 31/03/2027 31/03/2027 34 0 34 0 34 0 34 0 34 0
RES 8ac Christie Park Primary School Condition Survey Works 31/03/2027 31/03/2027 315 0 315 0 315 0 315 0 315 0
RES 8ad Our Lady of Loretto Primary School Condition Survey Works 31/03/2027 31/03/2027 315 0 315 0 315 0 315 0 315 0
RES 8ae Carleith Primary School Condition Survey Works 31/03/2027 31/03/2027 315 0 315 0 315 0 315 0 315 0
RES 8af St Mary’s Primary School, Alexandria 31/03/2028 31/03/2028 331 0 0 331 331 0 0 0 0 0
RES 8ag St Mary’s Primary School,Duntocher 31/03/2028 31/03/2028 331 0 0 331 331 0 0 0 0 0
RES 8ah Lennox Primary School & ELCC 31/03/2028 31/03/2028 331 0 0 331 331 0 0 0 0 0
RES 8ai Bonhill Primary School 31/03/2028 31/03/2028 331 0 0 331 331 0 0 0 0 0
RES 8aj St Stephen’s Primary School 31/03/2028 31/03/2028 331 0 0 331 331 0 0 0 0 0
RES 8ak Goldenhill Primary School 31/03/2028 31/03/2028 331 0 0 331 331 0 0 0 0 0
RES 8al St Michael’s Primary School 31/03/2029 31/03/2029 347 0 0 347 347 0 0 0 0 0
RES 8am Our Holy Redeemer Primary School - condition survey 31/03/2029 31/03/2029 348 0 0 348 348 0 0 0 0 0
RES 8an St Martin’s Primary School 31/03/2029 31/03/2029 348 0 0 348 348 0 0 0 0 0
RES 8ao Bellsmyre Campus 31/03/2029 31/03/2029 348 0 0 348 348 0 0 0 0 0
RES 8ap Kilpatrick Primary School & Kilpatrick ASN Secondary School 31/03/2029 31/03/2029 348 0 0 348 348 0 0 0 0 0
West Dunbartonshire Council
General Services Capital 2026/27
Full Project Life In Year
Page 273

Page 274

Official#
RES 8aq Our Lady & St Patrick’s High School 31/03/2029 31/03/2029 348 0 0 348 348 0 0 0 0 0
RES 8ar Braehead Primary 31/03/2029 31/03/2029 348 0 0 348 348 0 0 0 0 0
RES 8as Levenvale Primary School 31/03/2030 31/03/2030 365 0 0 365 365 0 0 0 0 0
RES 8at Gavinburn Primary School & ELCC 31/03/2030 31/03/2030 365 0 0 365 365 0 0 0 0 0
RES 8au Kilbowie ELCC 31/03/2030 31/03/2030 365 0 0 365 365 0 0 0 0 0
RES 8av Ferryfield ELCC 31/03/2030 31/03/2030 365 0 0 365 365 0 0 0 0 0
RES 8aw Ladyton ELCC 31/03/2030 31/03/2030 365 0 0 365 365 0 0 0 0 0
RES 8ax Lennox ELCC 31/03/2030 31/03/2030 365 0 0 365 365 0 0 0 0 0
RES 8ay Brucehill ELCC 31/03/2031 31/03/2031 383 0 0 383 383 0 0 0 0 0
RES 8az Auchnacraig ELCC 31/03/2031 31/03/2031 383 0 0 383 383 0 0 0 0 0
RES 8ba Whitecrook ELCC 31/03/2031 31/03/2031 383 0 0 383 383 0 0 0 0 0
RES 8bb Dalmonach ELCC 31/03/2031 31/03/2031 383 0 0 383 383 0 0 0 0 0
RES 8bc Gartocharn ELCC 31/03/2031 31/03/2031 383 0 0 383 383 0 0 0 0 0
RES 8bd Dalmuir ELCC 31/03/2031 31/03/2031 338 0 0 338 338 0 0 0 0 0
RES 8be Alexandria Library - condition survey works 31/03/2027 31/03/2027 0 0 0 0 0 0 0 0 0 0
RES 9 Direct Project Support (unallocated) 31/03/2027 31/03/2027 0 0 0 0 0 0 0 0 0 0
RES 9a Direct Project Support 31/03/2027 31/03/2027 15,860 0 1,586 14,274 15,860 0 1,586 130 1,586 0
RES 10 Depot Rationalisation 31/03/2027 31/03/2027 8,500 2,608 5,892 0 8,500 0 5,892 (19) 5,892 0
RES 11 Finance Ledger System 31/03/2027 31/03/2027 800 256 544 0 800 0 544 154 544 0
RES 12 Community Sports Facility at Millburn 31/03/2028 31/03/2028 500 16 104 380 500 0 104 0 104 0
RES 13 Holm Park Community Football Academy Accesibility Project 31/03/2027 31/03/2027 75 56 19 0 75 0 19 0 19 0
RES 14 4G Football pitch at Faifley Knowles 31/03/2027 31/03/2027 150 0 150 0 150 0 150 0 150 0
RES 15 Design, Creation, Installation of Digital Content for Glencairn House 31/03/2027 31/03/2027 187 0 187 0 187 0 187 0 187 0
55,737 3,116 13,458 39,164 55,738 0 13,458 255 13,458 0Total Resources
Page 274

Page 275

Official#
R&R Project Completion
Date
Revised End
Date
Project Life
Budget
Spend to
31/03/2026
Spend
Projected in
Current
Year
Projecte
d Future
Spend
Total
Projected
Spend
Project
Variance
Approved
Budget
2026/27
Actual to date
2026/27
Projected
Spend
In Year
Variance
RR 4 Regeneration/Local Economic Development (unallocated) 31/03/2036 31/03/2036 2,865 0 0 2,865 2,865 0 15 0 0 (15)
RR 4a Dumbarton Visitor Gateway/Arc of Attractions 31/03/2030 31/03/2030 250 0 20 230 250 0 100 0 20 (80)
RR 4a Dumbarton Castle Floodlighting 31/03/2028 31/03/2028 80 0 0 80 80 0 0 0 0 0
RR 4a Dumbarton Town Centre Heritage and Place Fund contribution 31/03/2029 31/03/2029 1,075 0 75 1,000 1,075 0 75 0 75 0
RR 4a Dumbarton Waterfront Walkway - consultancy & delivery 31/03/2029 31/03/2029 800 0 10 790 800 0 0 17 10 10
RR 4a Dumbarton High Street and Town Centre revitalisation 31/03/2030 31/03/2030 559 0 0 559 559 0 0 0 0 0
RR 4a Artizan Centre further phases 31/03/2030 31/03/2030 260 0 0 260 260 0 0 0 0 0
RR 4b Alexandria - Alexander Street fees 31/03/2027 31/03/2027 101 0 101 0 101 0 101 0 101 0
RR 4b Alexandria - Mitchell Way & Main Street improvements 31/03/2027 31/03/2027 800 0 0 800 800 0 800 31 0 (800)
RR 4b Alexandria - Mitchell Way - gas pipe relocation 31/03/2027 31/03/2027 88 0 0 88 88 0 88 0 0 (88)
RR 4b Tourism/Heritage Strategy Capital Projects 31/03/2028 31/03/2028 200 0 0 200 200 0 0 0 0 0
RR 4c District Heating Network Expansion 31/03/2028 31/03/2028 30 0 15 15 30 0 15 0 15 0
RR 4d Long term commitment to CLO 31/03/2030 31/03/2030 200 0 50 150 200 0 50 0 50 0
RR 4e Balloch Pierhead Action Plan 31/03/2028 31/03/2028 394 0 50 344 394 0 311 0 50 (261)
RR 5 Regeneration Fund 31/03/2029 31/03/2029 10,931 7,147 1,084 2,700 10,931 0 1,084 0 1,084 0
RR 6 Place Based Investment 31/03/2027 31/03/2028 2,176 1,501 465 210 2,176 0 675 12 465 (210)
RR 7 Level Up Funding 31/03/2027 31/03/2027 22,420 16,871 5,549 0 22,420 0 5,549 922 5,549 0
RR 10 Clyde Mission Catalyst Fund 31/03/2027 31/03/2027 2,000 1,438 561 0 2,000 0 561 4 561 0
RR 13 Pride in Place (unallocated) 31/03/2027 31/03/2027 0 0 0 0 0 0 0 0 0 0
RR 13a Holm Park Improvement 31/03/2027 31/03/2027 240 0 240 0 240 0 240 285 240 0
RR 13b Western Titans BMX Club track improvements 31/03/2027 31/03/2027 60 0 60 0 60 0 60 0 60 0
RR 13c Playpark - Christie Park 31/03/2027 31/03/2027 300 0 300 0 300 0 300 0 300 0
RR 13d Playpark - Dumbarton common 31/03/2027 31/03/2027 300 0 300 0 300 0 300 0 300 0
RR 13e Community capital grants 31/03/2027 31/03/2027 600 0 600 0 600 0 600 0 600 0
RR 14 The Scottish Marine Technology Park 31/03/2027 31/03/2028 4,229 0 2,729 1,500 4,229 0 4,229 0 2,729 (1,500)
RR 15 Clydebank Pride in Place Regeneration Plan 31/03/2036 31/03/2036 14,936 0 100 14,836 14,936 0 360 0 100 (260)
65,894 26,957 12,309 26,627 65,894 0 15,514 1,270 12,309 (3,204)Total Regulatory and Regeneration
Page 275

Page 276

Official#
R&N Project Completion
Date
Revised End
Date
Project Life
Budget
Spend to
31/03/2026
Spend
Projected in
Current
Year
Projecte
d Future
Spend
Total
Projected
Spend
Project
Variance
Approved
Budget
2026/27
Actual to date
2026/27
Projected
Spend
In Year
Variance
RN 1 Infrastructure - Roads (unallocated) 31/03/2036 31/03/2036 15,351 0 87 15,264 15,351 0 87 0 87 0
RN 1a Footways - schemes developed following condition surveys 31/03/2030 31/03/2030 2,176 0 544 1,632 2,176 0 544 0 544 0
RN 1b Drainage - various locations following assessment/investigation 31/03/2030 31/03/2030 600 0 150 450 600 0 150 0 150 0
RN 1c Structures - various locations following assessment/inspection 31/03/2030 31/03/2030 600 0 150 450 600 0 150 0 150 0
RN 1d Carriageways - schemes developed following condition surveys 31/03/2030 31/03/2030 5,100 0 0 5,100 5,100 0 0 0 0 0
RN 1ag PROV Douglas Road, Dumbarton 31/03/2027 31/03/2027 10 0 10 0 10 0 10 0 10 0
RN 1ah PROV Smollet Road, Alexandria 31/03/2027 31/03/2027 15 0 15 0 15 0 15 0 15 0
RN 1ai PROV Inchconnachan Avenue / Boturich Drive Balloch 31/03/2027 31/03/2027 30 0 30 0 30 0 30 0 30 0
RN 1aj PROV Tulliechewan, Balloch 31/03/2027 31/03/2027 90 0 90 0 90 0 90 0 90 0
RN 1ak PROV Mallard Road, Faifley 31/03/2027 31/03/2027 30 0 30 0 30 0 30 0 30 0
RN 1al PROV West Thomson Street, Clydebank 31/03/2027 31/03/2027 40 0 40 0 40 0 40 0 40 0
RN 1am PROV ErskineFerry Road, Old Kilpatrick 31/03/2027 31/03/2027 30 0 30 0 30 0 30 0 30 0
RN 1an PROV Langlands Terrace, Dumbarton 31/03/2027 31/03/2027 50 0 50 0 50 0 50 0 50 0
RN 1ao PROV Glasgow Road / Dock Street, Clydebank 31/03/2027 31/03/2027 420 0 420 0 420 0 420 0 420 0
RN 1ap PROV Faifley Road, Clydebank 31/03/2027 31/03/2027 155 0 155 0 155 0 155 0 155 0
RN 1aq PROV Clyde Street Clydebank 31/03/2027 31/03/2027 100 0 100 0 100 0 100 0 100 0
RN 1ar PROV Stark Avenue, Duntocher 31/03/2027 31/03/2027 30 0 30 0 30 0 30 0 30 0
RN 1as PROV John Street - Renton 31/03/2027 31/03/2027 20 0 20 0 20 0 20 0 20 0
RN 1at PROV Strathleven Drive, Bonhill 31/03/2027 31/03/2027 80 0 80 0 80 0 80 0 80 0
RN 1au PROV Talbot Road, Balloch 31/03/2027 31/03/2027 20 0 20 0 20 0 20 0 20 0
RN 1av PROV A82 Great Western Road 31/03/2027 31/03/2027 150 0 150 0 150 0 150 0 150 0
RN 1aw PROV Sandbank Crescent, Alexandria 31/03/2027 31/03/2027 20 0 20 0 20 0 20 0 20 0
RN 1ax Carriageway Resurfacing (following assessment) 31/03/2027 31/03/2027 200 0 200 0 200 0 200 0 200 0
RN 1ay Structural Patching (following assessment) 31/03/2027 31/03/2027 200 0 200 0 200 0 200 0 200 0
RN 1az PROV Leven Street, Renton 31/03/2027 31/03/2027 10 0 10 0 10 0 10 0 10 0
RN 2 Flood Risk Management (unallocated) 31/03/2027 31/03/2027 1,080 0 0 1,080 1,080 0 0 0 0 0
RN 2b Cycle 2 flood risk actions 31/03/2030 31/03/2030 775 0 200 575 775 0 200 0 200 0
RN 3 Street lighting and associated electrical infrastructure (unallocated) 31/03/2027 31/03/2027 998 0 98 900 998 0 98 0 98 0
RN 4 Flood Prevention 31/03/2027 31/03/2027 450 388 62 0 450 0 62 0 62 0
RN 5 Vehicle Replacement (unallocated) 31/03/2027 31/03/2027 9,538 0 1,322 8,216 9,538 0 1,322 214 1,322 0
RN 5a Resources 31/03/2027 31/03/2027 43 0 43 0 43 0 43 0 43 0
RN 5c Community Connections 31/03/2027 31/03/2027 40 0 40 0 40 0 40 0 40 0
RN 5d HSCP 31/03/2027 31/03/2027 44 0 44 0 44 0 44 0 44 0
RN 5e Estate Management 31/03/2027 31/03/2027 48 0 48 0 48 0 48 0 48 0
RN 5f Facilities 31/03/2027 31/03/2027 48 0 48 0 48 0 48 0 48 0
RN 5i Housing 31/03/2028 31/03/2028 512 0 192 320 512 0 192 0 192 0
RN 5m Libraries 31/03/2027 31/03/2027 125 0 125 0 125 0 125 0 125 0
Page 276

Page 277

Official#
RN 5v Waste 31/03/2028 31/03/2028 1,796 0 1,076 720 1,796 0 1,076 0 1,076 0
RN 5w Hire Replacements 31/03/2027 31/03/2027 300 0 300 0 300 0 300 0 300 0
RN 9 A813 Road Improvement Phase 1 31/03/2027 31/03/2027 1,579 1,386 193 0 1,579 0 193 0 193 0
RN 10 Traffic Signal Updates 31/03/2027 31/03/2027 300 286 14 0 300 0 14 0 14 0
RN 11 Gruggies Burn Flood Prevention 31/03/2029 31/03/2029 48,160 987 7,222 39,952 48,160 0 7,222 216 7,222 0
RN 12 River Leven Flood Prevention Scheme 31/03/2027 31/03/2027 381 181 200 0 381 0 200 0 200 0
RN 13 Public non-adopted paths and roads (unallocated) 31/03/2027 31/03/2027 1,461 0 278 1,183 1,461 0 278 49 278 0
RN 13c Dumbarton cemetery paths 31/03/2028 31/03/2028 75 0 0 75 75 0 0 0 0 0
RN 13d Old Dalnottar Cemetery 31/03/2028 31/03/2028 90 0 60 30 90 0 60 0 60 0
RN 13e Parks, cemeteries and open space non adopted paths, identified following
annual review 31/03/2029 31/03/2029 342 0 109 233 342 0 109 0 109 0
RN 14 Cemetery Extension, North Dalnotter 31/03/2028 31/03/2028 264 202 62 0 264 0 62 0 62 0
RN 16 Allotment Development 31/03/2028 31/03/2028 492 468 247 0 715 223 24 109 247 223
RN 18 Play Area Upgrade Programme (unallocated) 31/03/2027 31/03/2027 733 0 (67) 800 733 0 (67) 19 (67) 0
RN 18f Central Alexandria 31/03/2027 31/03/2027 42 0 42 0 42 0 42 0 42 0
RN 18g Tullichewan 31/03/2027 31/03/2027 20 0 20 0 20 0 20 0 20 0
RN 18h Christie Park 31/03/2027 31/03/2027 10 0 10 0 10 0 10 0 10 0
RN 18i Dalmonach Park 31/03/2027 31/03/2027 25 0 25 0 25 0 25 0 25 0
RN 18j Ladyton 31/03/2027 31/03/2027 10 0 10 0 10 0 10 0 10 0
RN 18k Dillichip Park 31/03/2027 31/03/2027 10 0 10 0 10 0 10 0 10 0
RN 18l Dumbarton Common 31/03/2027 31/03/2027 10 0 10 0 10 0 10 0 10 0
RN 18m Bowling 31/03/2027 31/03/2027 25 0 25 0 25 0 25 0 25 0
RN 18n Old Kilpatrick 31/03/2027 31/03/2027 15 0 15 0 15 0 15 0 15 0
RN 18o Goldenhill Park 31/03/2027 31/03/2027 10 0 10 0 10 0 10 0 10 0
RN 18p Rosshead 31/03/2027 31/03/2027 60 0 60 0 60 0 60 0 60 0
RN 18q Kirkoswald Drive 31/03/2027 31/03/2027 50 0 50 0 50 0 50 0 50 0
RN 18r Whitecrook Park 31/03/2027 31/03/2027 50 0 50 0 50 0 50 0 50 0
RN 18s Langfaulds Crescent, Clydebank 31/03/2028 31/03/2028 25 0 0 25 25 0 0 0 0 0
RN 18t Onslow Road 31/03/2028 31/03/2028 25 0 0 25 25 0 0 0 0 0
RN 18u Whylie Park, Renton 31/03/2028 31/03/2028 25 0 0 25 25 0 0 0 0 0
RN 18v St Helena Crescent 31/03/2028 31/03/2028 25 0 0 25 25 0 0 0 0 0
RN 20 Balloch Mountain Bike Track 31/03/2027 31/03/2027 450 11 439 0 450 0 439 2 439 0
RN 23 Creation of 2 new all weather pitches at Argyll Park and Mountblow playing
fields 31/03/2027 31/03/2027 1,451 49 1,402 0 1,451 0 1,402 2 1,402 0
RN 24 Exxon City Deal 31/03/2028 31/03/2028 47,942 25,738 17,186 5,018 47,942 0 17,186 3,318 17,186 0
RN 25 Active Travel 31/03/2027 31/03/2027 1,677 427 1,249 0 1,677 0 1,249 0 1,249 0
RN 29 Roads Lining and Signing 31/03/2027 31/03/2027 150 83 67 0 150 0 67 37 67 0
RN 30 Plant and Machinery Replacement (unallocated) 31/03/2027 31/03/2027 1,438 0 538 900 1,438 0 538 17 538 0
RN30a Plant and Machinery Replacement 31/03/2027 31/03/2027 0 0 0 0 0 0 0 0 0 0
RN 33 Shared Prosperity Funding - Open Places 31/08/2026 31/08/2026 396 0 396 0 396 0 396 0 396 0
RN 34 Nature Restoration Fund 31/03/2027 31/03/2027 250 81 169 0 250 0 169 1 169 0
Page 277

Page 278

Official#
RN 36 Food Waste Vehicles 31/03/2027 31/03/2027 500 0 500 0 500 0 500 0 500 0
RN 37 CCTV Upgrade at Depots 31/03/2027 31/03/2027 50 0 50 0 50 0 50 0 50 0
RN 38 Gully Motor Purchase 31/03/2027 31/03/2027 275 0 275 0 275 0 275 0 275 0
RN 39 Milton Park MUGA 31/03/2027 31/03/2027 130 109 21 0 130 0 21 0 21 0
150,347 30,398 37,174 82,998 150,570 223 36,951 3,983 37,174 223Total Roads and Neighbourhood
Page 278

Page 279

Official#
EDU Project Completion
Date
Revised End
Date
Project Life
Budget
Spend to
31/03/2026
Spend
Projected in
Current
Year
Projecte
d Future
Spend
Total
Projected
Spend
Project
Variance
Approved
Budget
2026/27
Actual to date
2026/27
Projected
Spend
In Year
Variance
EDUC 1 AV Equipment - Education 31/03/2030 31/03/2030 859 469 83 307 859 0 83 0 83 0
EDUC 3 Schools Estate Improvement Plan - next Phase - Faifley Campus 31/03/2027 31/03/2027 36,515 33,828 2,688 0 36,515 0 2,688 391 2,688 0
EDUC 4 Schools Estate Improvement Plan 31/03/2027 31/03/2027 21,904 20,746 1,158 0 21,904 0 1,158 1 1,158 0
EDUC 5 Free School Meals Expansion 31/03/2027 31/03/2028 1,265 80 185 1,000 1,265 0 1,185 0 185 (1,000)
Total Education 60,543 55,122 4,113 1,307 60,543 0 5,114 393 4,113 (1,000)
Page 279

Page 280

Official#
HSCP Project Completion
Date
Revised End
Date
Project Life
Budget
Spend to
31/03/2026
Spend
Projected in
Current
Year
Projecte
d Future
Spend
Total
Projected
Spend
Project
Variance
Approved
Budget
2026/27
Actual to date
2026/27
Projected
Spend
In Year
Variance
HSCP 1 Special Needs - Aids & Adaptations for HSCP clients (unallocated) 31/03/2027 31/03/2027 4,355 0 0 4,355 4,355 0 0 0 0 0
HSCP 1a Resources 31/03/2030 31/03/2030 909 0 229 680 909 0 229 0 229 0
HSCP 1b Stairlift 31/03/2030 31/03/2030 234 0 60 174 234 0 60 0 60 0
HSCP 1c Equipment 31/03/2030 31/03/2030 1,411 0 360 1,051 1,411 0 360 0 360 0
HSCP 1d Ceiling Track 31/03/2030 31/03/2030 32 0 8 24 32 0 8 0 8 0
HSCP 1e Physical Disabilities Aids and Adaptations 31/03/2030 31/03/2030 492 0 126 366 492 0 126 0 126 0
HSCP 2 ICT Modernisation HSCP (unallocated) 31/03/2027 31/03/2027 509 0 0 509 509 0 72 9 0 (72)
HSCP 2a Life Lens 31/03/2027 31/03/2027 13 0 0 13 13 0 13 0 0 (13)
HSCP 2b Magic Notes 31/03/2027 31/03/2027 48 0 0 48 48 0 48 0 0 (48)
HSCP 2c Staffing 31/03/2031 31/03/2031 238 0 45 193 238 0 45 0 45 0
HSCP 2d ICT Device 31/03/2031 31/03/2031 25 0 5 20 25 0 5 0 5 0
HSCP 2f Digital Inclusion (Prevention, Early Intervention, DCE) 31/03/2031 31/03/2031 50 0 10 40 50 0 10 0 10 0
HSCP 2g Digital Telecare (AICO project, tec hub, new technology) 31/03/2029 31/03/2029 72 0 13 59 72 0 13 4 13 0
HSCP 2h HSCP Systems/Applications (new applications, scripts, automation, data
utilisation) 31/03/2031 31/03/2031 152 0 25 127 152 0 25 0 25 0
HSCP 2i HSCP 2i Granicus Blue Badge 31/03/2027 31/03/2027 0 0 13 0 0 0 0 0 13 13
HSCP 2j HSCP 2j Website Development 31/03/2030 31/03/2030 0 0 48 0 0 0 0 0 48 48
HSCP 3 Community Alarm upgrade 31/03/2031 31/03/2031 143 0 59 84 143 0 55 0 59 4
Total HSCP 8,683 0 1,001 7,743 8,683 0 1,069 14 1,001 (68)
Page 280

Page 281

Official#
P&T Project Completion
Date
Revised End
Date
Project Life
Budget
Spend to
31/03/2026
Spend
Projected in
Current
Year
Projecte
d Future
Spend
Total
Projected
Spend
Project
Variance
Approved
Budget
2026/27
Actual to date
2026/27
Projected
Spend
In Year
Variance
P&T 1 ICT Modernisation (unallocated) 31/03/2027 31/03/2027 961 0 0 961 961 0 (153) 0 0 153
P&T 1a PCs for Education 31/03/2034 31/03/2034 625 0 0 625 625 0 0 0 0 0
P&T 1b Laptops for Education 31/03/2034 31/03/2034 747 0 136 611 747 0 136 0 136 0
P&T 1c Chromebooks for Education 31/03/2028 31/03/2028 307 0 0 307 307 0 0 0 0 0
P&T 1d PC's for Corporate Employees 31/03/2034 31/03/2034 81 0 0 81 81 0 0 0 0 0
P&T 1e Laptops for Corporate Employees 31/03/2034 31/03/2034 950 0 47 750 797 (153) 200 (126) 47 (153)
P&T 1f Mobile Phones 31/03/2033 31/03/2033 39 0 0 192 192 153 0 0 0 0
P&T 1g Public PC Replacement 31/03/2028 31/03/2028 26 0 0 26 26 0 0 0 0 0
P&T 1h Resources 31/03/2034 31/03/2034 984 0 123 861 984 0 123 0 123 0
P&T 1i Microsoft 365 Implementation Revised 31/03/2034 31/03/2034 0 0 120 (120) 0 0 0 0 120 120
P&T 2 ICT Security & DR (unallocated) 31/03/2027 31/03/2027 833 0 59 774 833 0 59 (90) 59 0
P&T 2c Replace Ageing Infrastructure Hardware 31/03/2034 31/03/2034 752 0 94 658 752 0 94 0 94 0
P&T 2d Security Compliance remediation 31/03/2034 31/03/2034 560 0 70 490 560 0 70 0 70 0
P&T 2e Security Resourcing - Security partner 31/03/2034 31/03/2034 184 0 23 161 184 0 23 0 23 0
P&T 2f Internal ICT resource recharges 31/03/2034 31/03/2034 720 0 90 630 720 0 90 0 90 0
P&T 2h Wi-Fi Technology licensing  31/03/2034 31/03/2034 720 0 90 630 720 0 90 0 90 0
P&T 2j Security Patching Improvements 31/03/2034 31/03/2034 160 0 20 140 160 0 20 0 20 0
P&T 3 365 Implementation 31/03/2027 31/03/2027 983 960 23 0 983 0 23 7 23 0
P&T 4 Development of Workforce Management System 31/03/2027 31/03/2027 110 2 108 0 110 0 108 0 108 0
P&T 5 Data Strategy 31/03/2027 31/03/2027 27 0 27 0 27 0 27 0 27 0
Total P&T 9,769 962 1,031 7,777 9,769 0 910 (208) 1,031 120
Overall Total 350,974 116,555 69,086 165,616 351,197 223 73,016 5,707 69,086 (3,929)
Page 281

Page 282

Page 282

Page 283

Official
WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 26 August 2026
___________________________________________________________________ 
Subject:  Housing Revenue Account Budgetary Control Report 
to 30 June 2026 (Period 03) 
1. Purpose 
1.1 The purpose of this report is to advise members on the 2026/2027 HRA revenue
budget position on 30 June 2026 and the forecast position for HRA reserves on
31 March 2027. 
2.  Recommendations 
2.1 Members are asked to: 
i. note the HRA revenue account is forecasting a deficit of £0.863m. If required,
HRA reserves will be used to fund the deficit. 
ii. note that the forecast deficit would reduce HRA reserves to £0.259m on 31
March 2027, significantly less than the HRA revenue prudential target for 31
March 2027 of £1.222m. 
iii. note that work will continue to explore opportunities to remove the in-year
deficit and to rebuild reserves, including the targeting of efficiencies across
all areas of the HRA revenue account budget. 
3. Background 
Revenue 
3.1 The Council approved a 2026/2027 HRA revenue budget of £60.880m on the
4th of March 2026. A prudential reserve target of £1.222m was also set (2% of
the revenue budget). HRA prudential reserves were £1.122m on 31st March
2026.  
4. Main Issues 
4.1  This report advises of the key issues contributing to the Housing Revenue
Account (HRA) forecasting a 2026/27 deficit of £0.863m. The forecast deficit
would require a call on HRA reserves and leave forecast HRA reserves of
£0.259m on 31 March 2027. Using existing reserves to address the funding
deficit adds risk to the wider financial position of the HRA with reduced
capacity to absorb any unforeseen future costs until the HRA rebuilds its
reserves. 
4.2  There are a range of unfavourable / favourable variance contributing to the
forecast deficit and the main variances are detailed below. 
ITEM 14
Page 283

Page 284

Official
Adverse Variances > £50,000 
Central Support Allocation - £0.535m Adverse   
4.3 The draft outcome from the review of the Council’s Central Support Allocation
(CSA) model during 2025/26 assessed the appropriate allocation of corporate
support costs to service users including the Housing Revenue Account. The
review determined that the Housing Revenue account CSA charge was
understated and needed to be increased. The 2026/27 HRA CSA budget was
set based on the older recharge model. Consequently, the amount that will be
charged to the Housing Revenue Account in 2026/27 is projected to exceed
budget and create an overspend / adverse variance. 
Repairs & Maintenance - £0.410m Adverse   
4.4 There continue to be cost pressures due to the high demand across the
responsive repair and void service. A range of mitigations are in place to
minimise the cost pressure including tighter controls on contractor use and the
stringent application of the rechargeable repairs policy.   
Loan Charges - £0.221m Adverse   
4.5 The main cost pressure is a forecast increase in the interest payable on HRA
capital debt. The 2026/27 HRA estimates assumed a pooled interest rate of
4.25% on HRA capital debt on 31 March 2027. The current pooled interest
rate forecast is 4.4%, higher than estimated and creating a cost pressure. 
4.6 Members will be aware of the significant risk and uncertainty around
forecasting local authority borrowing costs and geopolitical events have
contributed to an increase in the interest rates payable on new temporary and
new Public Work Loans Board (PWLB) borrowing. Consequently, there is a
risk of a further increase to the pooled interest rate during 2026/27. 
Favourable Variance > £50,000 
Employee Costs - £0.335m Favourable. 
4.7 The favourable variance is due to savings from vacant posts across the
service and an increase in HRA employee costs recharged to non HRA
revenue services including homelessness and HRA capital. 
5. People Implications 
5.1 There are no people implications. 
6. Financial and Procurement Implications 
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report. 
Page 284

Page 285

Official
7. Risk Analysis 
7.1 The main financial risk is the HRA going into deficit due to unforeseen costs
being identified between now and the end of the financial year. The Housing
(Scotland) Act 1987 specifies that if a HRA deficit arises in any one year, the
local authority must make a General Fund contribution to make good the
deficit. In this event, the HRA would be expected to repay that contribution
from future HRA surpluses. 
8. Equalities Impact Assessment (EIA) 
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report. 
9. Consultation 
9.1 All services involved in delivering the HRA revenue budget have been
consulted during the compilation of this report. 
10. Strategic Assessment 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.    
Laurence Slavin
Chief Officer – Resources
Date: 26 August 2026
___________________________________________________________________ 
Person to Contact:  Jim McCarron - Business Unit Finance Partner 
Telephone: 07772 322055   
e-mail james.mccarron@west-dunbarton.gov.uk 
Appendices:  Appendix 1 - Budgetary Position (Revenue)    
Appendix 2 - Variance analysis (Revenue)
Page 285

Page 286

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2026/27
PERIOD END DATE 30 June 2026
Budget
2026/27
Spend to Date
2026/27
Forecast Spend
2026/27 Annual RAG Status
£000 £000 £000 £000 %
Employee Costs 9,224                             1,998                         8,961                         (263) -3% 
Property Costs 1,497                             379                            1,514                         17                              1% 
Transport Costs 207                                49                              203                            (4) 0% 
Supplies, Services And Admin 471                                113                            507                            36                              8% 
Support Services 2,845                             845                            3,380                         535                            19% 
Other Expenditure 392                                105                            373                            (19) -5% 
Repairs & Maintenance 12,688                           2,729                         13,098                       410                            3% 
Open Space Maintenance 730                                183                            730                            -                                0% 
Bad Debt Provision 1,269                             317                            1,269                         -                                0% 
Void Loss (Council Tax / Lost Rents) 1,108                             270                            1,081                         (27) -2% 
Loan Charges / CFCR 30,449                           7,668                         30,670                       221                            1% 
Total Expenditure 60,880                           14,656                       61,786                       906                            1% 
House Rental Income (60,000) (15,000) (60,000) -                                0% 
Lockup Rental Income (249) (62) (249) -                                0% 
Other Rental income (143) (53) (162) (19) 13% 
Factoring Income (452) (119) (477) (25) 6% 
Miscellaneous Income (36) (7) (35) 1 -3% 
Total Income (60,880) (15,241) (60,923) (43) 0% 
Net Expenditure 0 (585) 863 863 
Subjective Summary Forecast Variance
2026/27
Page 286

Page 287

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 30 June 2026
PERIOD 3
Budget
2026/27
Forecast
Spend
2026/26
£000 £000 £000 %
Employee Costs 9,224 8,961 (263) -3% 
Main Issues
Mitigating Action
Anticipated Outcome
Support Services 2,845 3,380 535 19% 
Main Issues
Mitigating Action
Anticipated Outcome
Budget
2026/27
Forecast
Spend
2026/26
£000 £000 £000 %
Repairs & Maintenance 12,688 13,098 410 3% 
Main Issues
Mitigating Action
Anticipated Outcome
A draft review of the council’s Central Support Allocation (CSA) model during 2025/26
determined that the Housing Revenue account CSA charge was understated and needed to
be increased. The 2026/27 HRA CSA budget was set based on the older recharge model.
Consequently, the amount that will be charged to the Housing Revenue Account in 2026/27
will exceed budget and create an overspend / adverse variance.
The Housing Service will engage with central support service managers to explore cost
savings through the re-provisioning of services provided to the HRA.
A year end overspend.
A year end overspend.
Subjective Description
Responsive and planned repair and maintenance services to houses and lockups and income recovered from tenant rechargeable and
owner occupier repairs.
Variance Narrative
A high  volume of repair orders and ongoing inflationary pressures are driving up costs, with
the most significant pressure across responsive repair budgets.
Officers continue to put in place a range of mitigation measures to minimise the overspend,
including the transfer of qualifying repair spend to the HRA capital programme, primarily repair
works that extends asset lifespan.
Furthermore, Electrical Installation Condition Report (EICR) spend that is complementary to
the environmental sensor installation programme has also been funded from the HRA capital
programme.
Subjective Analysis Forecast Variance
2026/27
RAG
Status 
Variance Analysis
Subjective Description
Centrally funded support services that support HRA revenue service delivery. Services include Revenues and Benefits, Contact Centre, HR
Services, ICT Services, Corporate Administrative Support, Legal Services, Financial Services.
Variance Analysis
Subjective Analysis Forecast Variance
2026/27
RAG
Status
Subjective Description
Employees charged directly to the HRA.
Variance Narrative
Savings from vacant posts and an increased employee cost recharge to non HRA revenue
service areas will deliver an underspend.
None
A year end underspend
Variance Narrative
Page 287

Page 288

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2026/27
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 30 June 2026
PERIOD 3
Loan Charges / CFCR 30,449 30,670 221 1% 
Main Issues
Mitigating Action
Anticipated Outcome
Subjective Description
Loans Fund repayments and the payment of interest and expenses on outstanding HRA debt.
Variance Narrative
The main cost pressure is a forecast increase in the interest payable on HRA capital debt. The
2026/27 HRA estimates assumed a pooled interest rate of 4.25% on HRA capital debt at 31
March 2027. The current forecast is for the pooled interest rate to be 15 basis points higher
than estimated creating a cost pressure
Officers will continue to work with external  treasury advisors to structure council borrowing
and the loans portfolio in a manner that minimises debt servicing costs.
A year end overspend.
Page 288

Page 289

Official
WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 26 August 2026
___________________________________________________________________ 
Subject:  Housing Revenue Account (HRA) Capital   
Budgetary Control Report to 30 June 26 (Period 3) 
1. Purpose 
1.1 This report provides an update on the HRA capital programme to 30 June
2026. 
2. Recommendations 
2.1 Members are asked to: 
i) note the current position of the 2026/27 HRA capital budgets and the 5-
year HRA capital plan. 
ii) note that project life performance will be monitored against a project life
estimate of £336.506m and a project life income estimate of £53.821m,
a borrowing requirement of £282.685m. 
iii) note that in year financial performance will be monitored against a
2026/27 capital expenditure budget of £58.434m and a 2026/27 capital
income budget of £13.064m, a one-year borrowing requirement of
£45.370m. 
iv) note that at this early stage all projects are on track regarding achieving
their planned completion dates and delivering within their project life
estimate. 
v) Note that there is an anticipated underspend of £2.340m against
2026/27 budgets reducing the forecast one-year borrowing requirement
to £43.030m.  
3. Background 
3.1 The Council approved the HRA Capital Plan for 2026/2027 to 2030/2031 on 4
March 2026. The approved plan estimated £63.285m of capital expenditure
and £16.901m of capital income in 2026/27, a one-year borrowing
requirement of £46.384m. The project life borrowing requirement was
£272.665m. 
3.2  Since March, budget adjustments have taken place to reflect up to date
information on progress delivering the plan, including the carry forward of over
/ underspends at the end of financial year 2025/26 and the incorporation of
the latest cost and income forecasts.  The adjustments result in revised capital
budgets as set out in Exhibit 1. The updated borrowing requirement for 26/27
of £45.370m is £2.340m less than advised in March 2026. The project life
Page 289
ITEM 15

Page 290

Official
borrowing requirement increased to £282.398m because 2025/2026
underspends were brought forward into the revised capital plan. 
Exhibit 1: Revised HRA Capital Estimates 2026/2027 – 2030/2031 
2026/27
March 26 
(£m)
Project 
March 26 
(£m) 
2026/27
BCR03 
(£m)
Project 
BCR03 
(£m) 
2026/27
Change
(£m)
Project 
Change 
(£m
Other Capital   5.510 26.060  5.700 27.730 0.190 1.670
Component Replacement   14.600 73.000  14.600 80.083 0.000 7.083
Void Capital  5.400 27.000  5.400 26.514 0.000 -0.486
Structural & Environmental   3.400 18.600  4.521 21.890 1.121 3.290
Support Costs  3.400 17.000  3.400 17.000 0.000 0.000
More Homes    30.975 163.866  24.813 163.289 -6.162 -0.577
Total Expenditure  63.285 325.526  58.434 336.506 -4.851 10.980
Total Income   -16.901 -52.861  -13.064 -53.821 3.837 --0.960
Prudential Borrowing  46.384 272.665  45.370 282.685 -1.014 10.020 
4. Main Issues 
4.1 Progress against the 2026/27 capital plan is detailed in: 
Appendix 1 – HRA Capital Summary BCR03 
Appendix 2 – HRA Capital Detail BCR03 
4.2  The HRA capital summary report at Appendix 1 reports that: 
• There are fifteen capital projects where expenditure is tracked over the
multi-year life of the project and twenty-eight projects classified as rolling
programme projects / contingency / fees, that is programmes of work
where an annual estimate is set each year that takes account of demand,
cost, and affordability.
• At this early stage in the year, projected expenditure and projected income
are both in line with project life estimate. 
4.3  Appendix 2 shows all projects with their 2026/27 budget and their project life
estimate alongside the latest projections. The appendix reports: 
• 2026/27 projected spend of £55.894m, a £2.540m underspend against the
2026/27 expenditure budget.
• 2026/27 projected income of £13.151m, a £0.200m under-recovery
against the 2026/27 income budget.
• 2026/27 prudential borrowing forecast of £43.030m, £2.340m less than
budget. 
4.4 Commentary on the 2026/27 variances above £50,000 are set out in Exhibit 2
below. 
Page 290

Page 291

Official
Exhibit 2: Projected Over / Underspends 2026/27 as at BCR03 
Ref Project BCR03
Projection 
(£m) 
26/27
Budget
(£m) 
26/27
Variance
(£m)  Commentary
1 EESSH compliance
works
Expenditure
3.500 5.000 (1.500) Underspend reflects the
changing mix of the capital
programme with an increased
number of mixed tenure
blocks that require owner
consent before work can start.
This necessary process
delays project start. 
The underspend has been
reprofiled to a future year. 
2 Roofs
Expenditure
0.900 1.500 (0.600) Underspend reflects the
changing mix of the capital
programme with an increased
number of mixed tenure
blocks that require owner
consent before work can start.
This necessary process
delays project start. 
The underspend has been
reprofiled to a future year.  
3 Heating Works 
Expenditure 
1.600 2.400 (0.800) Underspend reflects a
reduced demand for
replacement heating systems. 
The underspend has been
reprofiled to a future year
pending a review of demand
across this programme. 
4 Void Capital 
Expenditure 
5.760 5.400 0.360 Overspend due to the high
number of void property
repairs being carried out by
the in-house team and
supporting contractors. 
The overspend has been
reprofiled to a future year 
5 Owner Recoveries
Income 
-0.300 -0.500 0.200 Under-recovery of income is
directly linked to the projected
underspend on the roofing
programme. 
The under-recovery has been
reprofiled to a future year 
4.5 Budget assumptions are required to forecast costs / income, especially where
projects span multi-year and project finances have yet to be finalised. It is
therefore likely that the projections will change during the year.
Page 291

Page 292

Official 
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the projected in-year financial position for the HRA capital
plan. 
8. Risk Analysis 
8.1 The main risks are as follows: 
(a) The reported variances should be viewed in the knowledge that there
are several variable factors which could arise between now and 31
March which could affect the year end results for capital budgets. 
(b) To forecast for the full year costs budget assumptions have been
required. These assumptions continue to change regularly and therefore
it is likely the projected year end position will change from that reported. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report. 
11. Consultation 
11.1 All services involved in delivering the capital estimates have been consulted
during the compilation of this report. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council. 
________________
Laurence Slavin
Chief Officer – Resources
Date: 26 August 2026 
Page 292

Page 293

Official
Person to Contact: Jim McCarron 
Business Partner, Finance 07772 322055  
E-mail: james.mccarron@west-dunbarton.gov.uk 
Appendices: Appendix 1 -  HRA Capital Summary BCR03 
Appendix 2-  HRA Capital Details BCR03 
Background Papers: 
Housing Revenue Account (HRA) Capital Investment Programme, Revenue
Budget, and Rent Levels for 2026/27 - Council 4 March 2026. 
Wards Affected           All Wards 
Page 293

Page 294

Period 03 - 30 June 2026 Appendix 1
Summary
HRA Capital Expenditure Project Life
Budget
£000
Project Life
Forecast Spend
£000
Project Life
Variance
£000
Rolling
Programmes
Projects Projects
On Track / Complete
Projects
Off Track
Other Capital Expenditure 27,730                    27,730                     -                           8                    -                                -                                -                               
Major Component Replacement 80,083                    80,083                     -                           7                    -                                -                                -                               
Void Capital 26,514                    26,514                     -                           1                    -                                -                                -                               
Structural & Environmental 21,890                    21,890                     -                           5                    -                                -                                -                               
Support Costs 17,000                    17,000                     -                           2                    -                                -                                -                               
More Homes Programme 163,289                  163,289                   -                           5                    15                                 15                                 -                               
Total Expenditure 336,506                  336,506                   -                           28                  15                                 15                                 -                               
Total Income (53,821) (53,821) -                           -                                -                               
Total 282,685 282,685 -                          
Page 294

Page 295

All Approved HRA Capital Projects at Period 3 Appendix 2
Project Category Planned
End Date
Project Life Budget Expenditure
to 31/3/26
Expenditure
to Date
Projected
Future Spend
Project Life Forecast
Spend
Project
Variance
Approved
Budget
2026/27
Expenditure
to Date
2026/27
Projected
Spend
2026/27
In Year
Variance
2026/27
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
OCE1 Special Needs Adaptations Rolling NA 3,225                            -                                    124                               3,101                            3,225                            -                                    650                               124                               650                               -                                    
OCE2 Capitalised Minor Works Rolling NA 15,942                         -                                    630                               15,312                         15,942                         -                                    3,100                            630                               3,100                            -                                    
OCE3 Better Homes Priority Budget Rolling NA 1,242                            -                                    6                                   1,236                            1,242                            -                                    200                               6                                    200                               -                                    
OCE4 Environmental Sensors Rolling NA 6,809                            -                                    391                               6,418                            6,809                            -                                    1,500                            391                               1,500                            -                                    
OCE5 Housing CCTV Rolling NA 100                               -                                    35                                 65                                 100                               -                                    100                               35                                  100                               -                                    
OCE6 QL Development Rolling NA 87                                 -                                    -                                    87                                 87                                 -                                    10                                  -                                     10                                  -                                    
OCE7 Gypsy Travellers Site Rolling NA 135                               -                                    -                                    135                               135                               -                                    -                                     -                                     -                                     -                                    
OCE8 Airport Noise Rolling NA 190                               -                                    -                                    190                               190                               -                                    140                               -                                     140                               -                                    
Other Capital Expenditure 27,730                         -                                1,186 26,544                         27,730                         -                                    5,700                            1,186                            5,700                            -                                    
MCR1 EESSH compliance works Rolling NA 27,916                         -                                    298                               27,618                         27,916                         -                                    5,000                            298                               3,500                            (1,500)
MCR2 Roofs Rolling NA 8,863                            -                                    4                                   8,859                            8,863                            -                                    1,500                            4                                    900                               (600)
MCR3 Windows / Doors Rolling NA 16,270                         -                                    579                               15,691                         16,270                         -                                    3,100                            579                               3,100                            -                                    
MCR4 Statutory / Regulatory Compliance Works Rolling NA 999                               -                                    -                                    999                               999                               -                                    100                               -                                     100                               -                                    
MCR5 Heating Rolling NA 12,622                         -                                    233                               12,389                         12,622                         -                                    2,400                            233                               1,600                            (800)
MCR6 Kitchens Rolling NA 10,828                         -                                    72                                 10,756                         10,828                         -                                    2,000                            72                                  2,000                            -                                    
MCR7 Bathrooms & Showers Rolling NA 2,585                            -                                    13                                 2,572                            2,585                            -                                    500                               13                                  500                               -                                    
Major Component Replacement 80,083                         -                                1,199 78,884                         80,083                         -                                    14,600                          1,199 11,700 (2,900)
VOC1 Void Capital Rolling NA 26,514                         -                                    -                                    26,514                                                   26,514                                   -   5,400                            -                                     5,760                            360                              
Void Capital 26,514                         -                                -                                26,514                         26,514                         -                                    5,400                            -                                     5,760                            360                              
STE1 Structural Works Rolling NA 2,330                                                                - -                                    2,330                            2,330                            -                                    -                                -                                     -                                -                                    
STE2 Paths & Environment Rolling NA 5,922                                                                - 220                               5,702                            5,922                            -                                    1,200                            220 1,200                            -                                    
STE3 Asbestos Management Works Rolling NA 955                                                                   - 22                                 933                               955                               -                                    200                               22                                  200                               -                                    
STE4 Multi Storey Flat Strategy Rolling NA 11,562                                                             - 5                                   11,557                         11,562                         -                                    2,000                            5                                    2,000                            -                                    
STE5 Cladding Remediation Works Rolling NA 1,121                            -                                    -                                    1,121                            1,121                            -                                    1,121                            -                                     1,121                            -                                    
Structural & Environmental 21,890                         -                                247                               21,643                         21,890                         -                                    4,521                            247 4,521                            -                                    
SUP1 Salaries / Central Support / Overhead Rolling NA 17,000                         -                                    850                               16,150                                                   17,000                                     - 3,400                            850                               3,400                            -                                    
SUP2 Vehicle Replacement Programme Rolling NA -                                -                                    -                                    -                                    -                                    -                                -                                     -                               
Support Costs 17,000                         -                                850                               16,150                         17,000                         -                                    3,400                            850                               3,400                            -                                    
AHP1 Buy Backs Rolling NA 20,000                         -                                    1,097                            18,903                                                   20,000                                     - 4,000                            1,097                            4,000                            -                                    
AHP2 Demolition Programme Rolling NA 1,000                            -                                    5                                   995                                                           1,000                                     - 200                               5                                    200                               -                                    
AHP3 Contingency Rolling NA -                                -                                    -                                    -                                                                  -                                       - -                                     -                                     -                                     -                                    
AHP4 Clydebank East Project September 25 33,554                         33,554                         33,554                         -                                                          33,554                                     - -                                     -                                     -                                     -                                    
AHP5 Pappert Project September 25 9,181                            9,181                            9,181                            -                                                            9,181                                     - -                                     -                                     -                                     -                                    
AHP6 Mount Pleasant Project September 25 5,364                            5,364                            5,364                            -                                                            5,364                                     - -                                     -                                     -                                     -                                    
AHP7 Willox Park Phase1 Project March 26 5,601                            5,416                            5,416                            185                                                           5,601                                     - 85                                  -                                     85                                  -                                    
AHP8 Willox Park Phase2 Project March 28 7,030                            108                               122                               6,908                                                        7,030                                     - 500                               14                                  500                               -                                    
AHP9 Bank Street Project March 27 6,347                            1,953                            3,160                            3,187                                                        6,347                                     - 4,244                            1,207                            4,244                            -                                    
AHP10 Bonhill Gap Sites Project September 27 9,086                            5,353                            6,725                            2,361                                                        9,086                                     - 3,400                            1,372                            3,400                            -                                    
AHP11 West Thomson Street Project September 28 15,827                         1,479                            1,494                            14,333                                                   15,827                                     - 2,000                            15                                  2,000                            -                                    
AHP12 Silverton Project September 27 2,379                            35                                 40                                 2,339                                                        2,379                                     - 1,100                            5                                    1,100                            -                                    
AHP13 Queen Mary Avenue Project September 26 4,540                            2,469                            3,203                            1,337                                                        4,540                                     - 1,971                            734                               1,971                            -                                    
AHP14 Queens Quay Site C Project March 30 5,531                            31                                 31                                 5,500                                                        5,531                                     - -                                     -                                     -                                     -                                    
AHP15 Dennystoun Forge – New Build Project March 28 4,589                            59                                 59                                 4,530                                                        4,589                                     - 1,000                            -                                     1,000                            -                                    
AHP16 28 Bridge Street Project September 27 1,010                            60                                 60                                 950                                                           1,010                                     - 950                               -                                     950                               -                                    
AHP17 Ottawa Crescent Project September 27 6,350                            413                               894                               5,456                                                        6,350                                     - 5,150                            481                               5,150                            -                                    
AHP18 Gray Street Project September 28 7,717                            4                                   17                                 7,700                                                        7,717                                     - 13                                  13                                  13                                  -                                    
AHP19 Future New Build & Related Regeneration Projects Rolling NA 17,183                         -                                    17,183                                                   17,183                                     - -                                     -                                     -                                     -                                    
AHP20 Fees, Staffing Costs, contingency Rolling NA 1,000                            -                                    30                                 970                                                           1,000                                     - 200                               30                                  200                               -                                    
More Homes Programme 163,289                       65,479                         70,452                         92,837                         163,289                                                           - 24,813                          4,973                            24,813                          -                                    
Total Expenditure 336,506                       65,479                         73,934                         262,572                       336,506                                                           - 58,434                          8,455 55,894 (2,540)
Full Project Life In Year Performance
Page 295

Page 296

All Approved HRA Capital Projects at Period 3 Appendix 2
Project Category Planned
End Date
Project Life Budget Income
to 31/3/26
Income
to Date
Projected
Future Income
Project Life Forecast
Income
Project
Variance
Approved
Budget
2026/27
Expenditure
to Date
2026/27
Projected
Spend
2026/27
In Year
Variance
2026/27
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
CAPI1 Scottish Govt Buyback Grant Rolling NA (12,000) -                                    (52) (11,948) (12,000) -                                    (2,400) (52) (2,400) -                                    
CAPI2 Willox Park Phase2 Project NA (2,850) (127) (127) (2,723) (2,850) -                                    (500) -                                     (500) -                                    
CAPI3 Bank Street Project NA (2,408) (1,307) (1,307) (1,101) (2,408) -                                    (1,101) -                                     (1,101) -                                    
CAPI4 Bonhill Gap Sites Project NA (4,518) (3,738) (3,738) (780) (4,518) -                                    (780) -                                     (780) -                                    
CAPI5 West Thomson Street Project NA (5,416) (1,485) (1,485) (3,931) (5,416) -                                    (2,000) -                                     (2,000) -                                    
CAPI6 Silverton Project NA (1,100) -                                    -                                    (1,100) (1,100) -                                    (1,000) -                                     (1,000) -                                    
CAPI7 Queen Mary Avenue Project NA (1,789) (1,789) (1,789) -                                    (1,789) -                                    -                                     -                                     -                                     -                                    
CAPI8 Queens Quay Site C Project NA (4,714) (2,014) (2,014) (2,700) (4,714) -                                    -                                     -                                     -                                     -                                    
CAPI9 Dennystoun Forge – New Build Project NA (2,400) -                                    -                                    (2,400) (2,400) -                                    (1,000) -                                     (1,000) -                                    
CAPI10 28 Bridge Street Project NA -                                    -                                    -                                    -                                    -                                    -                                    -                                     -                                     -                                     -                                    
CAPI11 Ottawa Crescent Project NA (2,800) (379) (379) (2,421) (2,800) -                                    (2,421) -                                     (2,421) -                                    
CAPI12 Gray Street Project NA (3,087) -                                    -                                    (3,087) (3,087) -                                    -                                     -                                     -                                     -                                    
CAPI13 Future new build sites & related regeneration projects Rolling NA (6,873) -                                    -                                    (6,873) (6,873) -                                    -                                     -                                     -                                     -                                    
CAPI14 Owners Recoveries Rolling NA (2,500) -                                    (78) (2,422) (2,500) -                                    (500) (78) (300) 200                              
CAPI15 Other Grant Rolling NA (1,361) -                                    -                                    (1,361) (1,361) -                                    (1,361) -                                     (1,361) -                                    
CAPI16 HRA Loan Repayments Rolling NA (5) -                                    -                                    (5) (5) -                                    (1) -                                     (1) -                                    
Total Income (53,821) (10,839) (10,969) (42,852) (53,821) -                                    (13,064) (130) (12,864) 200
Prudential Borrowing Requirement 282,685                       54,640                         62,965                         219,720                       282,685                       -                                    45,370                          8,325 43,030 (2,340)
Full Project Life In Year Performance
Page 296