Democracy Spraffa

Item 10 Appendix 1

West Dunbartonshire Council · 17 June 2026
Back to West Dunbartonshire Council — 17 June 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Official

Page 2

Contents                                                                 
Official 
Table of Contents 
Page   
Page
Management Commentary 1 Note 21   Financial Instruments 68 
Explanatory and Assurance Statements 
Note 22   Defined Benefit Pension
Scheme
74
Statement of Responsibilities 18 Note 23   Termination benefits 78
Annual Governance Statement 19 Note 24   Other Reserves 79
Remuneration Report 24 Note 25   Related Parties 81 
Principal Financial Statements of Single Entity 
Note 26   Agency Services 82
Comprehensive Income and Expenditure Statement 31 Note 27   Financial Guarantees 82
Balance Sheet 32  Note 28   Contingent Assets and
Liabilities
83
Movement in Reserves Statement 33 Note 29    Fees payable to External
Audit
84
Cash Flow Statement 34 Note 30   Events After the Balance
Sheet Date
84
Notes to the Principal Statements  Housing Revenue Account 85
Note 1    Accounting Policies 35 Council Tax income Account 87
Note 2    Critical Judgement in Applying Accounting Policies 48 Non-Domestic Rate Income
Account
88
Note 3    Assumptions Made About the Future and Other Major
Sources of Estimation Uncertainty
48 Common Good 89
Note 4    Accounting Standards that have been issued but   
have not yet been adopted
49 Trust Funds     90 
Note 5    Expenditure and Funding Analysis 50 Group Comprehensive Income and
Expenditure    
91
Note 6    Adjustments between funding accounting basis and
funding basis under regulations
54 Group Balance Sheet 92
Note 7    Earmarked Reserves 56 Group Movement in Reserves
Statement
93
Note 8    Financing and Investment (Income) and Expenditure- 56 Group Cashflow Statement 94
Note 9    Taxation and Non-Specific Grant Income 57  
Note 10   Grant Income 57 Note 31   Details of Combining
Entities
95
Note 11   Property, Plant and Equipment 59 Note 32   Non-Material Interests in
other Entities
97
Note 12   Intangible Assets 62 Note 33   Financial impact of
Consolidation
97
Note 13   Heritage Assets 62 Note 34   Analysis of Material Items
of Group Income and Expenditure
97
Note 14   Assets held for Sale 63 Note 35   Group Accounting
Policies
98
Note 15   Private Finance Initiatives and Similar Contracts 64 Independent Auditor’s Report 99
Note 16   Operating Leases 65 Glossary of Terms 100
Note 17   Debtors 67  
Note 18   Cash and Cash Equivalents 67  
Note 19   Creditors 68  
Note 20   Provisions 68

Page 3

Page 1
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Management Commentary
Introduction
Welcome to the Financial Statements for West Dunbartonshire Council (the Council) and its group for the year ended
31 March 2026. The Statements have been compiled in accordance with the Code of Practice on Local Authority
Accounting in the United Kingdom (the Code). This Management Commentary will demonstrate the stewardship of
public funds entrusted to the Council and outlines the key messages regarding the performance of the Council over
the 2025/26 financial year as well as providing an indication of risks and issues which may impact upon the Council in
the future.   
Profile of West Dunbartonshire Council
The Council is an average sized Council at around
71 square miles and has many strengths; including
significant sites of natural beauty and heritage,
good transport links and close proximity to Glasgow
and its airport. The area has a rich past, shaped by
its world-famous shipyards along the Clyde, and
boasts many attractions ranging from the iconic
Dumbarton Rock and the Titan Crane to the beauty
of Loch Lomond.
The Council is responsible for providing a wide
range of local authority services (including
education, housing, environmental health,
environmental services, planning, economic
development, employment, highways and
transport) to residents within the West
Dunbartonshire area. 
The Council is led by 22 councillors, elected every
five years to represent the residents within the area.
Following the Local Government elections in March
2022 the Council has had a Labour administration
with Councillor Martin Rooney as the Council
Leader.  The political make-up of the Council is
eight Scottish Labour Party, seven Scottish
National Party, six Independent and one West
Dunbartonshire Community Party.

Page 4

Page 2
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
The Council’s senior management structure consists of the Chief
Executive, seven Chief Officers, with the Integration Joint Board
(referred to as Health and Social Care Partnership (HSCP)) managed
at a senior level by a Chief Officer. 
The Council also has: 
• West Dunbartonshire Leisure Trust – an arm’s length organisation
which operates certain services on the Council’s behalf
• Clydebank Property Company - a regeneration company
• West Dunbartonshire Energy Company - an energy generation
company 99.9% owned by the Council. 
The Strategic Plan, Vision and Priorities
The Strategic Plan 2022-27 sets out the Council’s direction, with an
emphasis on improving the lives of residents and reducing inequality. Its
vision is to ‘deliver services which build on the strengths and resilience
of our neighbourhoods and support all residents to fulfil their individual
potential, and that of their communities.’ This focuses on four key
priorities: 
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
• Our Council - Inclusive and Adaptable 
These priorities reflect those set out in wider partnership plans such as Community Planning West Dunbartonshire’s
Local Outcomes and Improvement Plan and the West Dunbartonshire Health and Social Care Partnership Strategic
Plan. 
Specific objectives within each priority provide further detail, with progress measured through a suite of performance
indicators (PI) and targets. 
Delivery Plans
Delivery plans set out how the Strategic Plan priorities and objectives will be met. Developed annually for each strategic
area, they set out actions to deliver the Strategic Plan as well as actions to address the performance challenges and
service priorities identified in the planning process. They also provide an overview of services and resources, set out
the PIs for monitoring progress, and consider the relevant risks. 
Performance Reporting
Strategic Plan and Delivery Plans
Performance against the PIs and Strategic Plan actions and associated Delivery Plans is reviewed and managed by
Chief Officers throughout the year and reported to Council and Committees for scrutiny twice yearly, at mid-year and
year-end. 
The Strategic Plan progress report and Delivery Plan progress report set out 2024/25 performance in detail while the
infographic based Annual Report 2024/25, provides an overview across a wide range of areas including the Strategic
Plan, feedback from service users and residents, as well as budget and workforce information. 
The graph below summarises 2024/25 Strategic Plan performance, highlighting the outturn of the Plan’s 50 PIs
against the targets set for that year.

Page 5

Page 3
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Performance in 2025/26
While the Strategic Plan year-end progress report for 2025/26 is not yet final (due September 2026), a mid-year report
is available. This focuses on a sub-set of the Plan’s 50 PIs where data is available quarterly or bi-annually. Delivery
Plan mid-year progress reports for 2025/26 are also available for all seven strategic areas, with year-end reports due
to be published in summer 2026. 
Local Government Benchmarking Framework
All 32 Scottish councils measure a common set of PIs called the Local Government Benchmarking Framework
(LGBF). This allows us to compare performance, identify best practice, learn from each other, and improve what we
do. The framework comprises 109 cost, satisfaction and service indicators covering a wide range of council services. 
The table below provides a summary of our comparative performance in 2024/25, the most recent year for which data
is available. Published in early 2026, it compares our performance against the previous year, the Scotland average,
and our family group average (where the family group comprises a smaller group of similar councils in terms of
characteristics such as deprivation, urban/rural, and population sparsity/density). It is based on all data available at the
time of writing (May 2026): 
Council’s 2024/25 Performance compared to: Better Worse Identical
Previous year (Base: 96 PIs available) 52 54.2% 42 43.8% 2 2.1%
Scotland (Base: 99 PIs available) 46 46.5% 52 52.5% 1 1.0%
Family Group (Base: 99 PIs available) 47 47.5% 52 52.5% 0 0.0%
Change in Rank from 23/24 (Base: 96 PIs available) 41 42.7% 38 39.6% 17 17.7% 
In terms of quartile distribution, of the 99 PIs for which a 2024/25 rank can be generated, 25 (25.3%) were ranked in
quartile 1, 22 (22.2%) in quartile 2, 23 (23.2%) in quartile 3 and 29 (29.3%) in quartile 4.
The graph below summarises our performance over the last six years, showing the percentage of indicators in each of
the four quartiles, with the first quartile representing the top eight performing councils and the fourth quartile the
bottom eight.
Target met or
exceeded, 30, 60%
Target narrowly missed,
11, 22%
Target significantly
missed, 9, 18%
Strategic Plan 2024/25
Performance against Targets

Page 6

Page 4
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Key Achievements 2025/26
Some key achievements in 2025/26 in relation to the Council’s four strategic priorities are highlighted below: 
Priority 1 – Our Communities are Resilient and Thriving 
The Council: 
• Opened and launched Clydebank Museum and
Heritage Hub
• Processed 9,815 crisis grants and 2,902
community care grants  
• Was awarded South of Scotland Regional Lead
for Macmillan welfare rights services
• Enhanced community safety through the
completion of a CCTV installation.
• Opened Faifley Community Campus bringing
together two primary schools, an early years
centre and a specialist support base within a
single, integrated community campus
• Processed Clothing Grants to parents and
carers of 3,764 school pupils, Discretionary
Housing Payments to 4,112 vulnerable tenants,
£22.3m in Housing Benefit payments and
£10.1m in Council Tax Reduction payments.
• Progressed the delivery of the Glencairn House
an ambitious heritage-led regeneration initiative
to transform a historically significant building
into a vibrant cultural and community hub. 
0%
20%
40%
60%
80%
100%
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
33% 26% 28% 28% 24% 24% 25%
24% 30% 21% 30% 33% 28% 22%
17% 18% 22% 16% 13% 20% 23%
26% 26% 29% 26% 30% 28% 29%
Local Government Benchmarking Framework
Percentage of Performance Indicators by Quartile
1st Quartile 2nd Quartile 3rd Quartile 4th Quartile

Page 7

Page 5
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
In relation to education the Council:   
• Outperformed the national average in Broad General Education for attainment for children living in
our most deprived areas.
• Increased attainment in Early Learning and Childcare Centres (ELC) achieving the highest levels of
performance against our attainment benchmarks since 2017.
• Was recognised for the high quality of its Service Improvement Framework, identified by HM
Inspectors as a model of best practice.
• Delivered positive His Majesty’s Inspectorate (HMIE) school inspections at Our Lady and St
Patrick’s High School, Clydemuir Primary School and Choices School.
• Delivered positive Care Inspectorate early years inspections at Dalmuir ELC, Renton ELC, Lennox
(Faifley) ELC, Villa Kindergarten, Gartocharn, Carousel (Dumbarton), Great Start and Ferryfield with
Children’s Hour, Brookland and Carleith ELC receiving positive inspections from HMIE.
• Adult satisfaction with local schools remains consistently higher in West Dunbartonshire than both
the national average and comparator authorities. 
• Made significant progress in attendance for care experienced children, with 45% increasing their
attendance by an average of 10%. 
Priority 2 – Our Environment Promotes a Greener Future 
The Council: 
• Introduced a prioritised waste project leading to
significant reductions in waste sent to landfill.
• Completed Gruggies Burn design and completed
contract negotiations to have a construction contract
in place to deliver a £45m flood alleviation project.
• Developed a procurement strategy to establish the
basis for the transition from internal combustion
engines to electric powered vehicles.
• Secured £0.780m of funding to deliver energy
efficiency in non-traditional properties in Clydebank.
• Provided training and employment opportunities for
10 modern apprentices and engaged with over 300
volunteers to carry out environmental improvement
work

Page 8

Page 6
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Priority 3 – Our Economy is Strong and Flourishing 
The Council: 
• Undertook construction of the western
underbridge at A82/A814 junction in
partnership with Network Rail as part of the
wider Exxon Project.
• Brought 45 empty homes back into circulation
and completed projects to provide 65 new
homes including both mainstream housing
and sheltered accommodation.
• Was awarded the 2025 Glasgow Herald
Affordable Housing Development of the Year
for the Clydebank East Development.
• Supported the Malin Group and Strathclyde
University to secure £20m funding for the
Scottish Marine Technology Park 
• Supported the Clydebank Neighbourhood
Board in developing a Regeneration Plan
outlining the main priorities for Clydebank to
be delivered over the next 10 years with £20m
of Pride in Place funding.   
Priority 4 – Our Council is Inclusive and Adaptable 
The Council: 
• Delivered digital sessions to members of the local deaf
community, the first initiative of its kind in Scotland. 
• Established ‘Near Me Hub’ offering private digital access to NHS
appointments from Clydebank Library.
• Opened Riverside Additional Support Needs Secondary  
School, providing a fully accessible, rights-based learning
environment for young people with complex needs
• Had its website assessed by the Government Digital Service 
as meeting the required accessibility standards.
• Implemented the requirements of the new Disclosure Scotland
Act.  
• Installed fit for future bandwidth, introduced a suite of Artificial
Intelligence tools and implemented a new cyber incident and
response system.
• Trained 230 teaching and support staff on understanding autism, recognising and reducing anxiety, and building
emotional resilience, enhancing capacity to meet a wider range of learner needs. 
• Trained 50 secondary staff in Scottish Mental Health First Aid, increasing confidence and capability in supporting
young people with mental health concerns.

Page 9

Page 7
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Council’s 2025/26 Budgets
Revenue
The Council approved the 2025/26 revenue budget on 5 March 2025 based on band D Council tax of £1,559.86. The
budget was set at £311.153m (as detailed in the table below) to be funded by Scottish Government Grant (£258.184m);
Council tax (£45.426m), Central Government Grant (£1.486m), with a net contribution from reserves for the remaining
(£6.057m).   
Service Budget (£,000) % Budget
Resources 4,452                1.43%
Regulatory and Regeneration 4,406                1.42%
People and Technology 10,385              3.34%
Citizens, Culture and Faciliaties 14,553              4.68%
Education, Learning & Attainment 141,393            45.44%
Roads & Neighbourhoods 15,885              5.11%
Housing & Employability 2,920                0.94%
Health and Social Care Partnership 93,442              30.03%
Miscellaneous Services 4,612                1.48%
Loan charges 16,708              5.37%
Requisitions 2,397                0.77%
Total 311,153            100.00%   
The budget was updated during the year for a number of variables, resulting in a final planned net expenditure of
£313.821m. The year-end revenue budgetary position is set out on page 9 of this commentary. 
Capital 
On 5 March 2025, the Council also approved the revised capital plan with a planned General Services spend in
2025/26 of £73.780m. In-year additional projects increased the planned spend by £5.941m to £79.721m and
completed, accelerated and reprofiled budgets for 2025/26 of £20.139m resulted in an overall 2025/26 capital
programme of £59.582m. This investment is funded from a range of sources including government grants and ongoing
council revenue. Major areas of investment are economic regeneration, school modernisation, roads and
infrastructure and a range of other council assets.
Housing Revenue Account (HRA)
On 5 March 2025, the Council agreed an increase in Council house rents of 8.0% and approved the HRA budget and
approved planned capital investment of £70.590m for 2025/26. The year-end revenue and capital budgetary position is
set out on page 10 of this commentary. 
Overview of Core Financial Statements
The Statement of Accounts contains the Financial Statements of the Council and its group for the year ended 31 March
2026. The Council operates two main Funds: 
1. General Fund - expenditure and income associated with running council services (except the provision of council
houses). Predominantly funded by Scottish Government grant and council tax.
2.  Housing Revenue Account - expenditure and income associated with the provision of council housing. Predominantly
funded primarily through rental income from tenants. 
Two major categories of expenditure are included in the financial statements:   
1. Revenue expenditure - day to day running costs incurred to provide services.
2. Capital expenditure - cost of buying, constructing, and improving Council assets.

Page 10

Page 8
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Expenditure is recorded in a number of the main statements in these accounts with the purposes of these main
statements being as follows: 
Page Statement Statement Details
31 Comprehensive Income
and Expenditure Statement
(CIES)
Income and expenditure for all Council services.
32 Balance Sheet A summary of the Council’s assets and liabilities. It is a statement of the
resources of the Council and the means by which they have been
financed.  It is also a snapshot of the Council’s financial affairs at the close
of the year expressed in accounting terms.
33 Movement in Reserves
Statement
How the surplus/deficit on the Income and Expenditure Account for the year
reconciles to the movement on the General Fund. Also highlights movement
on all other reserves held on the Council’s Balance Sheet. Further
information on each of the reserves held and how they may be used is
detailed within note 24.
34 Cash Flow Statement Inflows and outflows of cash arising from transactions with third parties on
revenue transactions and capital activities. Cash is defined for the purpose
of the statement as cash-in-hand and deposits repayable on demand less
overdrafts repayable on demand.
35-
84
Notes to the Financial
Statements  
Further information and analysis of each statement, including the main
accounting policies.
85 Housing Revenue Account  Income and expenditure for Council housing services for the year and
includes the Statement of Movement on the HRA Balance 
2025/26 Financial Performance 
Revenue: Outturn against Budget 
General Fund
This account covers the day-to-day operational income and expenditure for each service of the Council and is
reported in line with the Council’s Chief Officers. Income from council tax, non-domestic rates, capital, and revenue
support grants was £350.927m with a net expenditure on services for the year of £315.870m (shown on page 31 – Net
Cost of Services).
The Council’s financial performance is presented in the Comprehensive Income and Expenditure Statements (CIES) on
page 31, which shows a deficit on the provision of service of £14.462m (represented by a £0.952m deficit on the General
Fund and a £13.510m deficit in the HRA).  This statement is prepared using International Financial Reporting Standards
as interpreted by the Code.  However, it does not reflect the true cost or the amount to be funded from taxation and
government grant income.  Note 6 details the accounting adjustments required to reflect performance against the use
of reserves and statutory funds.   The adjustments remove the impact of non-cash items such as depreciation,
revaluation and replace these with the actual cost of debt repayment.  Consequently, the general fund balance has
increased by £12.652m, against a planned use of reserves during 2025/26 budget setting of £1.063m.  The table below
shows a summary of the movements that contributed to the final position.

Page 11

Page 9
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Revised
Budget
£'000
Actual
£'000
Variance
£'000 £'000
Total General Services Reserves Held at 1 April 2025 (12,272)
Resources 4,880 6,544 1,664
Regulatory and Regeneration 5,213 4,893 (320)
People & Technology 10,460 10,135 (325)
Citizens, Culture and Facilities 18,776 19,029 253
Education, Learning and Attainment 138,396 138,842 446
Roads and Neighbourhood 18,125 18,099 (26)
Housing and Employability 908 (227) (1,135)
Miscellaneous Services 7,920 8,646 726
Health and Social Care Partnership 94,103 94,103 0
Loan charges 16,708 11,657 (5,051)
Transfer to Reserves 4,294 (3,470) (7,764)
Requisitions 2,491 2,434 (57)
Non GAE Allocation (8,453) (7,701) 752
Net Expenditure 313,821 302,984 (10,837)
Council Tax (45,426) (45,949) (523)
Revenue Support Grant/NDR (260,328) (260,945) (617)
Central Government Funding (1,672) (2,347) (675)
use of Resevres (6,395) (6,395) 0
Revenue Budget Outturn Position 6,395 (6,257) (12,652) (12,652)
Closing Useable Reserves Balance (24,924)
As a result of the overall surplus, the General Fund reserves increased from £12.272m to £24.924m.  The graph below 
shows how the useable reserves of the Council are made up, including the £15.407m earmarked to support future
budget strategy which are detailed in Note 7. 
The Council has a policy of holding a minimum of £5.469m uncommitted balance (2.5% of the Council’s budgeted net
annual running costs).  As at 31 March 2026 the Council had £9.517m of free reserves (4.47% of actual running costs)
which is above the prudential target.  The use of reserves is reviewed as part of the budget setting each year. 
Provisions
The Council has provisions totalling £0.618m on the Balance Sheet as detailed in Note 20 to the Accounts. 
0 5 10 15 20 25
As at 31 March 2026
As at 31 March 2025
Reserve Balances
Earmarked Unearmarked
£(m)

Page 12

Page 10
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Cash Flow Statement
The Council’s cash flow statement shows a increase of cash and cash equivalents of £19.190m during 2025/26 (Note
18) mainly as a result of timing differences for reprofiling of debt.
Housing Revenue Account (HRA)
By law the Council maintains a separate account for the running and management of its housing stock and had 10,581
housing units at 31 March 2026 (2025: 10,547). The movement in year is as follows: 
Opening House Number 10,547
Disposals (78)
buy Backs 36
New Builds 76
Closing House Number 10,581 
The account reported a surplus for the year of £0.511m. In line with the prudential reserves policy (2% of expenditure),
the target reserves level for the HRA for 2025/26 was £1.160m. Taking account of the £0.511m in-year surplus and
the brought forward balance from the previous year of £0.611m, the reserves balance available to the HRA for future
use is £1.122m.  The reserves balance is therefore £0.038m below the prudential target. The Council aims to increase
HRA reserves over the medium term so that reserves are maintained at or above target. 
The HRA’s budget performance for the year is summarised in the following table. The table also highlights how the in-
year deficit affects the overall reserves balance held for future use. Further information is noted on page 85.
Budget
Spend
against
Budget Variance
£'000 £'000 £'000 £'000
Total HRA Reserves Held at 1st April 2025 (611)
Total Expenditure 56,780 58,500 1,720
Total Income (56,780) (59,011) (2,231)
Contribution to Reserves (511)
Total HRA Reserves Held at 31 March 2026 (1,122)
The net budgetary position shown in the HRA Statement can be reconciled to the surplus reported in the HRA Income
and Expenditure Statement (page 85) as set out below:
£'000 £'000
(Surplus)/Deficit for the year on HRA services 13,511
HRA Movement in Reserves
Adjustment to the revenue resource (27,456)
Adjustment between Revenue and Capital resources 13,434
Transfer (to)/from other Statutory reserves 0
Movement in HRA revenue (14,022)
Adjust for earmarked funds:
Use of earmarked sums 511
Net HRA budgetary control position 2025-26 0
HRA Reserves as at 1 April 2025 (611)
Use of earmarked sums (511)
HRA reserve as at 31 March 2026 (1,122)
2025-26
Balance Sheet
The Balance Sheet on page 32 summarises the Council’s assets and liabilities as at 31 March 2026.  Explanatory notes
are provided in the accompanying notes to the accounts.  The net worth of the Council has decreased by £37.824m
from £367.053m as at 31 March 2025 to £329.229m as at 31 March 2026. The major changes are set out in the table
below.

Page 13

Page 11
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
31 March
2025 £’000
31 March
2026 £’000
Movement
£’000
Main Reason
Long-term Assets 1,284,685 1,275,052 (9,633) Movement as a result of the revaluation
and indexation of non-current assets
and capital expenditure offset by in year
depreciation.
Current Assets 77,682 110,966 33,284 Increase in cash and cash equivalents
due to timing of repayment of debt, an
increase in assets held for sale as a
result of more land assets being
actively marketed and an increase in
short term debtors due to timing
differences.
Current Liabilities (401,895) (416,921) (15,026 Increase in short-term borrowing in year
to support the GS and HRA capital
programme.
Long-term
Liabilities
(593,419) (639,868) (46,449) Increase in long-term borrowing to
support HRA and GS capital
programme.  
Total (367,053) (329,229) (37,824) 
Pension Assets and Liabilities
The net asset arising from the Council’s involvement in the defined benefit scheme totals £530.495m as at 31 March
2026. However, this has been limited to nil in line with the accounting requirements of IFRIC 14 to limit the recognition
of a pension asset to the extent to which the Council can recover the benefits through either refunds or reduced
contributions. As the Council cannot withdraw from the scheme or recover funds directly, the asset is therefore limited
to the forecast reductions in contributions as compared to the forecast future service costs. This has limited the
recognition of the pension asset to nil. 
The Council has continued to recognise the unfunded element of its pension liabilities as there are no scheme assets
to cover the future costs of these liabilities as they are due going forward.  The increase in the pension asset is mainly
as a result of strong investment returns and an increase in discount rate resulting in lowering the value placed on the
obligations as at 31 March 2026, partially offset by future pension, and salary decrease assumptions. The appointed
actuaries remain of the view that the asset holdings of Strathclyde Pension Scheme and the contributions from
employees and employers provide sufficient security and future income to meet future pension liabilities. 
Non-Current Assets
The Council owns a number of different types of assets, as listed in the Balance Sheet. These assets are used for
ongoing and future service delivery provided by the Council to its residents. The remit for the Council’s Strategic Asset
Management Group is to ensure the most efficient use of these assets in pursuit of the Council’s strategic priorities. The
Group manages this through ongoing review of the overarching Strategic Asset Management Plan, which is supported
by a number of individual Asset Management Plans (including properties, infrastructure, vehicles and equipment, etc.). 
The Council requires to assess the value of assets held based on current market conditions. During 2025/26 particular
assets have increased in value by £10.575m however, at the same time, impairment and downward revaluations have
reduced the value of other Council assets by £67.945m, resulting in a net decrease in value of £57.370m. These
movements adjust either the revaluation reserve in the Balance Sheet or are included within the Net Cost of Service
within the Income and Expenditure Statement, depending on the history of the asset.
Borrowing
The Council’s 2025/26 Treasury Strategy was agreed by the Council on 26 March 2025. The Council raised new long-
term loans of £190.000m (2024/25 £115.000m) and short-term loans of £332.500m (2024/25 £336.600m) and repaid
naturally maturing debt of £453.472m (2024/25 £380.452m). 
The total outstanding long-term debt (excluding PPP debt and ROU asset liability) as at 31 March 2026 was £521.476m
(2024/25 £467.240m) including £248.622m (2024/25 £216.581m) for the Council’s housing stock.  The total outstanding

Page 14

Page 12
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
short-term debt was £348.607m (2024/25 £334.350m), including £165.737m (2024/25 £154.463m) for the housing
stock. 
The interest and expenses rate charged by the Council’s loans fund was 4.39% (4.64% in 2024/25). 
Capital Finance
The Council is able to regulate its own capital spending limits within the framework recommended by the Chartered
Institute of Public Finance and Accountancy and endorsed by the Scottish Government. The necessary treasury
indicators and safeguards have been approved by Council.  The Council’s Treasury Management Strategy and Capital
Strategy are approved at Council. Details of the capital expenditure and financing are shown in Note 11. Total gross
capital expenditure amounted to £98.366m with the split between £50.216m for General Services and £48.150m for the
HRA. The main capital projects progressed during 2025/26 were:
General Services HRA
Dumbarton Town Centre - Levelling Up Fund Buyback & New Build Programme
Exxon City Deal Window/Door renewals
Faifley Campus Kitchen & Bathroom Upgrades 
Heating  Upgrades 
Environmental Sensor Programme 
Roof Renewals 
Energy Compliance Works 
CCTV Upgrades 
During 2025/26, the Council had budgeted capital expenditure of £115.129m with an actual in year spend of £98.366m.
The unspent amount £16.763m includes overspends, underspends and reprofiling, as noted within the table below. The
total reprofiling on planned spend was £10.264m – 8.92% (2024/25 6.02%) of the overall capital budget. 
Budget
Actual
Spend Variance Overspend Underspend Reprofiling
Service £'000 £'000 £'000 £'000 £'000 £'000
Corporate Services 3,408 5,232 1,824 1,761 0 64
Education 10,322 10,083 (239) 28 0 (267)
Infrastructure, Regeneration & Development 44,531 33,650 (10,881) 79 (969) (9,991)
Miscellaneous Services 1,321 1,251 (70) 0 0 (70)
General Services Total 59,582 50,216 (9,366) 1,868 (969) (10,264)
HRA 55,547 48,150 (7,397) 7,548 (14,945) 0
Total 115,129 98,366 (16,763) 9,416 (15,914) (10,264)
The majority of reprofiling has occurred within a number of larger capital projects and is mainly due to the timing of
starting individual projects, for various reasons, not all within Council control, and the delayed spend on these projects
moved into capital budgets for 2026/27 onwards. The most significant reprofiling was experienced against the following
projects: 
General Services
Gruggies Burn Flood
Prevention Scheme
Further design underway following value engineering. It is anticipated this
budget will be utilised in 2026/27.
Vehicle Replacement Delay due to the vehicle build time associated with the specialist vehicles
and the delivery lead time from the date of supply order placement.
Exxon City Deal Project underway and progressing well, however, spend not in line with
original projection due to delays to works on site and defect completion on
Network Rail works

Page 15

Page 13
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Public Private Partnership (PPP) and other Long-Term Liabilities
The Council entered into a PPP for the provision of three community learning centres and a primary school providing
the Council with replacement buildings for three secondary schools which were handed over in 2009/10 with the primary
school handed over during 2011/12. In accordance with statutory accounting guidance, full detail is provided within Note
15. 
On 31 March 2016, the Council entered into a 25 year ‘Design, Build, Finance and Maintain’ (DBFM) arrangement with
the Scottish Government via the Scottish Futures Trust, for the provision of a further new secondary school. The school
was handed over for use by the Council during 2017/18. The detail is also included within Note 15.
Group Accounts
Local authorities are required to prepare group accounts in addition to their own Financial Statements where they
have material interest in other organisations.  The group accounts on pages 91 to 98 consolidate the Council’s
Financial Statements, the Common Good and Trust Funds and four other entities (including two further subsidiaries –
West Dunbartonshire Leisure Trust and Clydebank Property Company). The effect of combining these entities on the
Group Balance Sheet is to increase reserves and net assets by £19.918m creating an overall net asset of £349.147m.
As there is no reason to suggest the future funding to these organisations will not continue, the accounts have been
prepared on a going concern basis.
The Financial Outlook, Key Risks and the Future 
In setting the 2026/27 budget on 4 March 2026, the Council faced a number of significant financial pressures resulting
from historic real term reductions in government funding, inflationary pressures, in particular the impact of bank interest
rates, service demand increases and local government pay awards not being fully funded.   
The 4 March 2026 Council meeting also approved the updated General Fund capital plan, the 2026/27 HRA revenue
budget and the updated 5-year HRA capital plan. The capital plans include funding for several projects over the next
five years and the revenue impact of these investments is built into future revenue plans.   
Following the setting of the budget in March 2026, budget projections identified expected budget gaps in the mid-range
scenario of £10.905m in 2027/28 rising cumulatively to £44.028m in 2030/31. At a Council meeting on 17 June 2026 a
further Financial Update was presented which adjusted these gaps to reflect changes to budget assumptions and cost
pressures and extended the projection to 2031/32.  This resulted in amended estimated mid-range scenario budget
gaps of £10.005m in 2027/28 rising cumulatively to £52.161m in 2031/32. 
Alongside the announcement of the Scottish budget on 13 January 2026, the Scottish Government also released its
three-year spending review. This document outlines multi-year spending plans for various Scottish Government
portfolios spanning from 2026/27 to 2028/29. It illustrates that Local Government funding, in cash terms, is expected to
decrease slightly over the three-year period which will require councils to absorb the financial pressures brought about
by inflationary increases.  If the Council continues to receive real term funding cuts, there will continue to be a need to
review the manner in which services are delivered and the level they are delivered at. 
Management of Risk
The main financial risks identified by the Council over the medium and long term include: 
• the unknown position from Scottish Government on future funding levels particularly given the ongoing decline in
Council population, historic real term reductions in local government funding and the most recent Scottish
Government Spending Review
• changing demands and needs for Council services (particularly in relation to older people)
• continued inflationary pressures and interest rates which impact on the cost of service delivery and the delivery of
capital programmes
• ongoing discussions with the Scottish Government about the provision of funding in relation to maintaining
teacher numbers and reduced class contact time

Page 16

Page 14
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
• the impact of pay award negotiations and the extent to which responsibility for funding these is shared by the
Scottish Government. 
The Annual Governance Statement, shown on pages 19 to 23, details the arrangements the Council has put in place
for the proper governance of the Council’s affairs and for the management of risk. This Statement explains the system
of internal control in place and sets out improvement actions to the governance framework identified from the
Council’s ongoing review of these arrangements. 
Risks are identified with actions to minimise and/or mitigate those risks (where possible) through the Council’s
performance monitoring system (Pentana), which is reported to Members on a regular basis. 
The Future
In recognition of the scale of the current financial challenge the Council will continue to identify service redesign and
business transformation options, and these will be reported to appropriate committees during 2026/27. Further work will
be done to identify saving options to be considered by Council when determining the 2027/28 budget in March 2027. 
A number of major projects continue to be progressed as follows: 
Glasgow City Region City Deal – the Council, together with a number of other Scottish local authorities, is participating
in the Glasgow Region City Deal which will see over £1.1 billion invested in the area. The City Deal consists of a number
of significant capital projects across the area together with employability projects – to generate economic regeneration
and additional jobs. The project within the City Deal specific to the Council is an infrastructure project at the Exxon site
at Bowling to regenerate the site and to create a relief road along the A82 at Milton.   
The Exxon project continues to progress, with planning approval granted in January 2024. Construction will continue
through 2026/27 in line with the approved programme, supported by dedicated governance through the Exxon Project
Board.  A key milestone was achieved in 2025 with the construction of the western under-bridge at the A82/A814
Glasgow Road junction, delivered in partnership with Network Rail. Enabling works were completed in advance of the
successful installation beneath the main railway line during the Christmas 2025 period. 
In addition, the Scottish Marine Technology Park at a former oil storage site in Old Kilpatrick was awarded grant funding
of £4.23m of Investment Zone funding through Glasgow City Region in March 2026. This funding award has the potential
to accelerate the regeneration of this second strategic site on the banks of the River Clyde and contribute to the
sustainable economic growth of the area. 
Local Regeneration Fund (formerly known as Levelling Up Fund) – The Local Regeneration Fund is a capital fund
to address systemic weaknesses in the economies of the UK’s towns and cities. The first round was announced at the
2020 Spending Review with an aim to support communities in realising this vision. The Council were successful, as part
of round 1, in securing £19.9m for three interlinked regeneration projects in Dumbarton town centre. These include the
re-use of the listed Glencairn House (construction complete) as a town centre library and museum, the redevelopment
of the largely vacant and run-down Artizan Centre (underway) and Connecting Dumbarton (complete) which will improve
walking and cycling routes in the town centre. The funding programme runs to March 2028, but many of the positive
regeneration outcomes will be longer term. 
Pride in Place Fund (formerly known as Plan for Neighbourhoods Fund) – Clydebank was selected by the UK
Government as part of the Government’s broader Pride in Place programme to receive £20m of Pride in Place Fund.
The first tranche of funding was released in April 2026, with the remainder expected over a 10-year period and split into
75% capital funding and 25% revenue funding. In line with UK Government guidance, a Clydebank Neighbourhood
Board has been established with an independent Chair to develop a Regeneration Plan and direct the use of the Fund
in partnership with the Council. The funding will be spent on locally identified priorities, with the aim to achieve strategic
objectives of thriving places, stronger communities and taking back control. The Regeneration Plan developed in
partnership with the local community and the Council, was formally approved by the UK Government in March 2026. It
identifies a list of interventions which contribute towards realising the strategic objectives of the programme and
regenerating Clydebank. The Council is the accountable body for the funding.

Page 17

Page 15
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Net Zero Collaboration – The Council and Glasgow City Council (GCC) have agreed to work collaboratively on their
shared Net Zero objectives and toward meeting targets, set by the Scottish Government, related to the ‘Climate Change
(Scotland) Act 2009’ and ‘Climate Change (Emissions Reductions Targets) (Scotland) Act 2019’. A WDC/GCC
Collaboration Board has been formed to oversee progress.   
The stated mission is: ‘To bring together officers from both West Dunbartonshire Council and Glasgow City Council to
collaborate on projects to support both Council’s collective ambition of becoming net-zero and supporting the national
ambition of being net zero emissions by 2045’. 
To achieve the mission we will consider opportunities to collaborate on land-use, securing climate investment and share
lessons learned on exemplar projects to inform future projects. By acting on areas of common interest and opportunity
within the net zero agenda we will elevate and add value to benefits for both councils. 
Governance has been developed to ensure development and delivery of initiatives are progressed in line with the
anticipated outcomes and spirit of the agreement.  The Project Board have regular meetings to review and analysis
business cases and progress within each of the key themes. 
The Gruggies Burn Flood Alleviation Scheme:  The Council is progressing the Gruggies Burn Flood Alleviation
Scheme following the award of Scottish Government funding. The overall project budget is estimated at £48 million with
the Scottish Government funding 80% of the approved contract value. The remaining 20% and any additional costs will
be met in full by the Council.
Gruggies Burn is an open watercourse approximately one mile in length, extending from the confluence of the Garshake
Burn and Overtoun Burn to its outfall into the River Clyde estuary. The burn includes steep, fast-flowing culverted
sections, four road crossings, one footpath crossing, and a tidally influenced outfall. As a result, it has two principal
historic flood pathways: fluvial flooding and tidal flooding which can result in flooding of a number of properties in the
Dumbarton East area, including Castlegreen Street, Glasgow Road, Buchanan Street, and surrounding streets.
Construction is expected to commence on site in autumn 2026, with early works planned during the summer period.
Once complete, the scheme will significantly reduce flood risk for 631 properties in the area.
Other Information
Asset Management
The Council has a significant investment embedded in assets, comprising offices, schools, vehicles, houses, ICT
infrastructure and equipment.  It is important these are managed in an efficient and effective manner. The Council has
an overarching Corporate Asset Framework and Property Asset Plan 2023-2028 which was approved by Committee in
February 2023.  In addition, there are service specific Asset Plans covering Open Spaces, Roads Structures, Housing
and Vehicle, Fleet and Plant which were all approved at the relevant service committees and will undergo refreshes in
future years. We continue to identify any areas of over provision or inefficient value within the Council’s assets in line
with the Property and Land Disposal Strategy 2021-2026. 
Equality and Diversity
The Council is firmly committed to the principle of equality of opportunity. The Council recognises its responsibility as a
community leader, service provider and employer to encourage the fair treatment of all individuals and to tackle social
exclusion. The Council is also committed to eradicate all forms of discrimination, direct or indirect and aims to eliminate
discriminatory practices and promote measures 
to combat its effects. 
Information on the Council’s Equality Outcomes and Mainstreaming Plan 2025-2029 can be found on the Council
website at Equality Scheme 
Consultation and Communication with Workforce 
The Council has employee governance arrangements to ensure its employees are well informed, involved in
decisions, appropriately trained, treated fairly and consistently and provided with a safe environment. The Council
carries out regular employee engagement and seeks the views of the workforce through regular consultations with
staff and trade unions.

Page 18

Page 16
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Carbon Emissions and Energy Consumption 
The Council approved a Climate Change Strategy in November 2020 which has set an overall target to reduce carbon
emissions to 'net zero' by 2045 which will align with Scottish Government targets.  This includes two interim targets of
a 61% reduction by 2030/31 (versus 2012/13 baseline) and 87% reduction by 2040/41 (versus 2012/13 baseline). The
Climate Change Strategy will be updated by the end of this financial year, carbon emission targets for 2030/31 and
2040/41 are unlikely to change significantly.  
The carbon emission data for 2024/25, reported in November 2025, shows significant positive progress. The value of
18,235 tonnes of carbon emissions from Council operations represents a 33.8% reduction on the previous year, 44.7%
reduction on 2012/13 baseline and 5.7% ahead of projected target for 2024/25. The main reduction is from the Council's
waste emissions, which is a result of shifting a significant amount of waste from landfill to incineration through the Net
Zero Cooperation Agreement with Glasgow City Council. 
Annual progress of the Climate Change Action Plan is monitored through annual reporting to the Council’s
Infrastructure, Regeneration & Economic Development (IRED) Committee and additionally monitored as part of the
Regulatory and Regeneration Services Delivery Plan twice per year to Corporate Services and IRED
Committees.  Furthermore, progress is monitored via the Climate Change Action Group and reported to the senior
management team on a quarterly basis.
Remuneration Report
This report presents information on the remuneration of senior elected members and senior officers within the Council
(pages 24 to 30). 
Financial Performance Indicators
This commentary includes information on a set of financial PIs. These are aimed at providing the reader with a summary
of key information and are summarised in the following table: 
2024/25
Outturn
General Services Performance 2025/26
Target
2025/26
Outturn
£0.68 Cost of collecting council tax (per
dwelling)
Demonstrates the Council's effectiveness
in collecting local taxation
£3.00 £5.34
14.10% Council tax as a percentage of
overall funding
Demonstrates the amount of budget raised
through council tax
n/a 14.78%
93.80% In-year council tax collection rate Demonstrates the Council's effectiveness
in collecting local taxation
93.50% 93.60%
£39.909m Amount of income from council tax
for the year that was received
Demonstrates the Council's effectiveness
in collecting local taxation
n/a £44.582m
61% Value of free reserves expressed
as a percentage of the prudential
reserve target
Demonstrates how much free reserves the
GS has, in comparison to the agreed
minimum
100% 174%
1.82% Value of free reserves expressed
as a percentage of the net annual
budget
Demonstrates the percentage of budget
covered by free reserves
3.00% 4.47%
£-2.908m Movement in the free reserve
balance
Demonstrates variances contributing to the
overall free reserve position
n/a £5.913m
101.04% Revenue budget compared to
actual outturn at year end  -
including top up of provisions
Demonstrates actual spend as a
percentage of the planned budget (less
than 100% indicates an underspend)
n/a 96.55%

Page 19

Page 17
Management Commentary                                       
West Dunbartonshire Council Annual Accounts 2025/26
Official
2024/25
Outturn
Prudence And Affordability – Capital 2025/26
Target
2025/26
Outturn
7.25% Ratio of financing costs to net revenue
stream (excluding PPP) – General Services
Demonstrates how much of the General
Fund revenue budget is used to support
previous capital investment
12.96% 7.27%
50.37% Ratio of financing costs to net revenue
stream – HRA
Demonstrates how much of the HRA
revenue budget is used to support previous
capital investment
53.00% 48.13%
£871.164m Capital Financing Requirement The amount of planned capital expenditure
not yet funded
£891.537m £871.164m
£886.622m External Debt Levels (including PPP and
leases)
The amount of external debt held by the
Council. Increases due to funding of the
capital programme
£947.408m £923.501m
2024/25
Outturn
Housing Performance 2025/26
Target
2025/26
Outturn
57% Value of free reserves expressed as a
percentage of the prudential reserve
target
Demonstrates how much free
reserves the HRA has, in comparison
to the agreed minimum
100% 97%
1.15% Value of free reserves expressed as a
percentage of the net annual budget
Demonstrates the percentage of
budget covered by free reserves (2%
minimum target)
2.00% 1.94%
£(0.358)m Movement in the free reserve balance Demonstrates variances contributing
to the overall free reserve position
n/a £0.511m
100.00% Revenue budget compared to actual
outturn at year end
Demonstrates actual spend as a
percentage of the planned budget
(less than 100% indicates an
underspend)
n/a 99.10%
Where to find more information
In This Publication - An explanation of the Financial Statements and their purpose are shown at the top of each page.
The accounting policies and a glossary of terms can be found at the end of this publication, and these provide an
explanation of the main guidelines and terms used. 
On Our Website - Further information about the Council can be obtained on the Council’s website (West Dunbartonshire
Council https://www.west-dunbarton.gov.uk/) or from Finance Services, 16 Church Street, Dumbarton, G82 1QL. 
Conclusion
The financial results show the Council had a more positive outturn in 2025/26 than in 2024/25, with the general fund
position improving due to a combination of one-off benefits during the year and close management of service budgets.
This has enabled the Council to rebuild reserve levels.  However, the financial outlook remains challenging, with
continued real term funding pressures placing strain on front-line service delivery.  The Council’s Financial Statements
continue to be reported on a going concern basis. 
Acknowledgement
The production of the Annual Financial Statements is very much a team effort and we wish to record our thanks to both
Finance staff and to colleagues in all services whose efforts have contributed to the completion of these Statements of
Accounts. 
Councillor Martin Rooney  Peter Hessett    Laurence Slavin
Leader of the Council   Chief Executive    Chief Officer - Resources
Date: 17 June 2026   Date: 17 June 2026   Date: 17 June 2026

Page 20

Page 18
Statement of Responsibilities                                 
West Dunbartonshire Council Annual Accounts 2025/26
Official
The Council’s Responsibilities
The Authority is required to:
• Make arrangements for the proper administration of its financial affairs and to secure that one of its officers
has the responsibility for the administration of those affairs (section 95 of the Local Government (Scotland)
Act 1973).  In this authority, that officer is the Chief Officer – Resources.
• Manage its affairs to secure economic, efficient and effective use of resources and safeguard its assets;
• Ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority Accounts
(Scotland) Regulations 2014 and so far as is compatible with legislation in accordance with proper accounting
practices (Section 12 of the Local Government in Scotland Act 2003). 
• Approve the Annual Accounts for signing.
I confirm that these Annual Accounts were authorised for issue on 17 June 2026.
Signed on behalf of West Dunbartonshire Council 
Councillor Martin Rooney
Leader of the Council 
The Chief Officer - Resources Responsibilities
The Chief Officer – Resources is responsible for the preparation of the Council’s Annual Accounts, in
accordance with proper practices as required by legislation and as set out in the CIPFA/LASAAC
Code of Practice on Local Authority Accounting in the United Kingdom (“The Accounting Code”). 
In preparing the Annual Accounts, the Chief Officer - Resources has: 
• Selected suitable accounting policies and then applied them consistently. 
• Made judgements and estimates that were reasonable and prudent. 
• Complied with legislation. 
• Complied with the Local Authority Accounting Code (in so far as it is compatible with
legislation). 
The Chief Officer – Resources has also:
• Kept adequate accounting records which were up to date. 
• Taken reasonable steps for the prevention and detection of fraud and other irregularities. 
• Signed and dated the Balance Sheet. 
I certify that the financial statements give a true and fair view of the financial position of the local
authority and its group at the reporting date and the transactions of the local authority and its group
for the year ended 31 March 2026. 
Laurence Slavin
Chief Officer - Resources

Page 21

Page 19
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Annual Governance Statement 
Executive Summary
Subject to the sections below, and on the basis of the assurances provided, we consider the governance arrangements
operating during 2025/26 to be fit for purpose in that they are operating effectively and support the achievement of West
Dunbartonshire Council’s strategic priorities. Areas for improvement that will be actioned in 2026/27 are outlined in the
sections below. 
The Council is responsible for and committed to ensuring its business is conducted in accordance with the law and
proper standards, and public money is safeguarded and properly accounted for, and used economically, efficiently and
effectively. It also has a statutory duty to make arrangements to secure best value under the Local Government in
Scotland Act 2003. 
This statement has been prepared in accordance with Delivering Good Governance in Local Government: Framework
(CIPFA/Solace, 2016) Addendum 2025. 
There were no significant governance issues or failures identified by the Council’s governance review in the year
2025/26 or between 31 March 2026 and the date of signing.  Actions in support of improvements to the governance
arrangements in 2026/27 include actions in response to internal and external audit, and those actions outlined at the
relevant sections below. The Council is committed to ensuring that governance arrangements remain fit for purpose and
effective in 2026/27 and beyond. 
Martin Rooney   Peter Hessett   Laurence Slavin
Leader of the Council  Chief Executive  Chief Officer – Resources
Date:    Date:    Date: 
Our Assessment of Effectiveness
The Council has a responsibility to review, at least annually, the effectiveness of its governance framework including
the system of internal control. The review of effectiveness of the framework is informed by the work of the Corporate
Management Team which has responsibility for the development, implementation and maintenance of the governance
environment, the Council’s Chief Internal Auditor’s annual report; and reports from the external auditors and other review
agencies and inspectorates. Further detail on how the overall opinion is determined is provided in the sections below. 
Local Code
The Council has approved and adopted a Local Code of Corporate Governance (the Local Code), which is consistent
with the principles of the Chartered Institute of Public Finance and Accountancy (CIPFA) and the Society of Local
Authority Chief Executives (SOLACE) Framework: “Delivering Good Governance in Local Government”. The Local Code
evidences the Council's commitment to achieving good governance and demonstrates how it complies with the
governance standards recommended by CIPFA. The Council’s current Code of Good Governance was approved at the
Audit & Performance Review Committee on 8 March 2017. The main features of our governance arrangements are
described in the Local Code which is available from the Council website at:
http://www.west-dunbarton.gov.uk/media/4312582/wdc-local-code.pdf.   
This statement explains how the Council expects to comply with the Local Code and also meets the Code of Practice
on Local Authority Accounting in the UK, which details the requirements for the Annual Governance Statement.  An
assessment of the Council’s compliance with the Code of Good Governance is supported by a process of self-
assessment and assurance certification by Chief Officers and the outcome of this assessment was reported to Council
on 17 June 2026.  Each Chief Officer was presented with a self-assessment checklist to complete and return as evidence
of review of the seven key areas of the Council’s governance framework which provided assurance for their service
areas.

Page 22

Page 20
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Our assessment has concluded that each of the core arrangements for the local code are operating effectively.  Where
points for improvement have been identified these are detailed in the relevant section below. 
Best Value Assurance
Governance arrangements are in place and are aligned to support the Council’s delivery of strategic priorities and to
meet its responsibilities for best value.  
External assurance is provided over best value arrangements and is overseen by the Accounts Commission.  This work
is integrated into annual audit reporting to build local audit knowledge and reduce the scrutiny burden on councils. 
External audit also conduct thematic reviews as directed by the Accounts Commission.   
For 2024/25 this work focused on Transformation: how councils are redesigning and delivering more efficient services
to achieve planned outcomes.  The Council’s appointed external auditors completed their work in this during 2025/26
with a report presented to Audit Committee in February 2026.  The report recognised the Council’s commitment to
service improvement and modernisation and made two recommendations for improvement.  In response, two actions
have been agreed – the first being that the Council will carry out a review of its current Transformation reporting by
March 2027.  The second action has already been completed – the Council has reviewed capacity to support the delivery
of transformation and put in place funding to secure additional capacity for future reviews.  
Internal Audit Conclusion 
The Internal Audit service undertakes an annual programme of work, approved by the Audit Committee, based on a
strategic risk assessment. The Chief Internal Auditor provides an annual independent opinion on the adequacy and
effectiveness of the system of internal control. 
The annual report and assurance statement prepared by the Chief Internal Auditor concluded that the overall control
environment opinion was “Generally Satisfactory with some improvement needed” such that reasonable assurance can
be placed upon the adequacy and effectiveness of the Council's system of internal control.  In reaching this conclusion,
the Chief Internal Auditor noted risks raised by Internal Audit in 2025/26 relating to relating to Housing Repairs and
Maintenance.   Individually, these risks do not significantly impair the Council’s systems of internal control.  Furthermore,
management have reported progress and detailed plans to mitigating these risks.  The remaining risks will continue to
be kept under review, with auditors monitoring compliance with the agreed actions as part of regular follow-up updates
which will be reported to the Audit Committee. 
External Assurance Providers
Effective scrutiny and service improvement activities are supported by the formal submission of reports, findings and
recommendations from Forvis Mazars the external auditor, Inspectorates and the Internal Audit section to the Corporate
Management Team, the relevant service Committee of the Council and, where appropriate, the Audit Committee.
In October 2025, External Auditors issued their Annual Audit Report for the year ended 31 March 2024, setting out the
expectation of an unqualified opinion on the truth and fairness of the state of the Council’s affairs as presented in its
2023/24 accounts would be provided.  Forvis Mazars made recommendations for improvement with regards to internal
controls in its Annual Audit Report.  These recommendations have been accepted and an action plan agreed with
management. 
The Purpose of the Governance Framework
The governance framework comprises the systems, processes, and culture and values by which the Council is directed
and controlled and through which it accounts to and engages with communities. It enables the Council to monitor the
achievement of the strategic objectives set out in the Strategic Plan and whether they have led to the delivery of
appropriate and value for money services.
The Council has a system of internal control to manage risk to a reasonable level. Internal controls cannot fully eliminate
risk of failure to achieve policies, aims and objectives and can therefore only provide reasonable assurance of
effectiveness. The system of internal control is based on an ongoing process designed to: 
• identify and prioritise the risks to the achievement of the Council's policies, aims and objectives

Page 23

Page 21
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
• evaluate the likelihood of those risks being realised and the impact should they be realised
• manage the risks efficiently, effectively and economically. 
The governance framework has been in place at the Council for the year ended 31 March 2026 and up to the date of
the approval of the Statement of Accounts. 
Scope of responsibility
The Council is responsible for and committed to ensuring its business is conducted in accordance with the law and
proper standards, and public money is safeguarded and properly accounted for, and used economically, efficiently and
effectively. It also has a statutory duty to make arrangements to secure best value under the Local Government in
Scotland Act 2003. This statement explains how West Dunbartonshire Council has complied with the Local Code and
also meets the Code of Practice on Local Authority Accounting in the UK, which details the requirements for an Annual
Governance Statement. 
In discharging this responsibility, the Council's Elected Members and Corporate Management Team are responsible for
putting in place proper arrangements for the governance of its affairs and facilitating the effective exercise of its
functions, which includes arrangements for the management of risk. The Council has established an arms-length
external organisation: West Dunbartonshire Leisure Trust – to deliver leisure services more effectively on the Council’s
behalf, which reports regularly to Elected Members. 
From 1 July 2015 the West Dunbartonshire Health and Social Care Partnership was established to continue the
development of the integration of social care and health services between the Council and NHS Greater Glasgow and
Clyde. 
In relation to the effectiveness of governance arrangements and systems of internal control for the Council’s group
entities, the Council places reliance upon the individual bodies’ management assurances in relation to the soundness
of their systems of internal control. 
Compliance with Best Practice
Statement on the role of the Chief Financial Officer in local government
The Council complies with the requirements of the CIPFA Statement on “The Role of the Chief Financial Officer in Local
Government 2010”. The Council’s Chief Financial Officer (Section 95 Officer) has overall responsibility for the Council’s
financial arrangements and is professionally qualified and suitably experienced to lead the Council’s finance function
and to direct finance staff. 
Statement on the role of the Head of Internal Audit in Public Service Organisations
The Council complies with the requirements of the CIPFA Statement on “The Role of the Head of Internal Audit in Public
Service Organisations 2019”. The Council’s Chief Internal Auditor has responsibility for the Council’s Internal Audit
function and is professionally qualified and suitably experienced to lead and direct the Council’s Internal Audit staff. The
Internal Audit service generally operates in accordance with the CIPFA “Public Sector Internal Audit Standards 2017”. 
Where our Governance Needs to Improve
The following main issues and areas for improvement during 2025/26 have been identified through the self-assessment
exercise carried out by Chief Officers against key aspects of the Code of Good Governance.  These will be monitored
as part of the next annual review in 2026/27.

Page 24

Page 22
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Improvement Area identified in 2025/26  Responsible Officer
Financial Regulations were approved by Council in 2023.  Finance
are currently undertaking a review and a revised version will be
presented to Council in August 2026.
Chief Officer, Resources
Action is being taken to strengthen the induction checklist process
by ensuring signed off by employee and manager/team leader.
Chief Officer, Education
Work to consolidate approaches across service areas with regards
to the Corporate Complaints Process is underway. Training is
planned for central officers.
Chief Officer, Education 
How we have improved our governance arrangements in 2025/26 
The table below provides an update on improvements implemented in the year 2025/26. In addition to these actions,
improvements have been implemented in 2025/26 as a result of recommendations from Forvis Mazars the external
auditor, Inspectorates and Internal Audit.   
Improvement Area identified by 2023/24 and/or
2024/25 Exercises
Update
Embedding Be the Best Conversations within all service
teams.
Substantially complete.  Some
further work required to ensure
embedded across all services and a
consistent approach is applied.
Chief Officer Citizen, Culture and
Facilities 
Chief Officer, Education
Business Classification Scheme will be rolled out to
relevant service areas in relation to electronic records.  
Closed - this action is superseded
by the Microsoft 365 project action
below.  
Work is ongoing to implement the Council’s information
classification policy and procedure as part of the Microsoft
Office 365 project.  
In progress
Data Protection/Information
Governance Officer
Improvements have been recognised in terms of how
global share is organised in relation to how we structure
our data on the shared drive and comply with document
retention timescales. Preparation for move to Microsoft
365 in session 2025/26.
In progress
Chief Officer, Education
Process for reporting on the status of external audit
actions regularly to Audit Committee will be developed
and implemented.
Outstanding
Will be completed in 2026/27
Chief Officer, Resources
Guidance for keeping school funds has been updated,
following audit. Work with establishments this session to
ensure compliance with guidance
In progress
Chief Officer, Education
Work is required in some services to review and update
business continuity planning documentation.
In progress
Chief Officer Housing
Chief Officer Roads & Neighbourhood 
Chief Officer Regulatory &
Regeneration
Chief Officer, HSCP
There are different induction and performance appraisal
processes across HSCP services reflecting the
differences in organisations.  Work is ongoing to review
and improve the induction process.
In progress
Chief Officer, HSCP
Weekly, monthly and quarterly management information is
supplied to all HSCP managers and relevant governance
forums however it is recognised these reports could be
further developed to improve the quality of the data and
In progress
Chief Officer, HSCP

Page 25

Page 23
Annual Governance Statement                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
Improvement Area identified by 2023/24 and/or
2024/25 Exercises
Update
ensure the provision of robust management information
across the HSCP.  
In relation to self-evaluation, it is recognised that the
HSCP would benefit from a more structured approach to
self-evaluation.
In progress
Chief Officer, HSCP
In relation to staff training and development, it is
recognised this is an area for improvement with clarity of
input from partners to be achieved.
In progress
Chief Officer, HSCP
Succession planning is recognised as an area of
improvement for the HSCP and positive steps have been
taken to address this across the HSCP.
In progress
Chief Officer, HSCP
Key business continuity plans are in place.  Work is
ongoing to develop business impact analysis
documentation across the HSCP.
In progress
Chief Officer, HSCP
Levels of procurement compliance remain consistent but it
is recognised that further work is required to strengthen
procurement and commissioning arrangements within the
HSCP to ensure costs and risks are managed
appropriately.
In progress
Chief Officer, HSCP
Improvement actions arising from external inspection are
monitored by the HSCP Board however further work is
required in this area.
Complete 
Financial procedures are being developed for Area
Resource Group to ensure risk focused decision-making
underpins all agreed packages of care/placements to care
homes and an escalation pathway to ensure Chief Officer
sign off where there is potential for emergency care
packages to breach regulations. 
Complete 
Future Governance Considerations
2026/27 will see the extension of a collaborative arrangement with Inverclyde Council to also include East
Dunbartonshire Council. This will involve the sharing of a Chief Internal Auditor post between the three Councils.  The
expected benefits of the change are increased resilience, demonstrating compliance with the legal requirement to review
the Internal Audit services for efficiency, sharing of audit approaches across the three Council teams and standardisation
of approach leading to efficiencies and improvements in the quality of audit work. 
The Council continues to recognise the need to exercise strong management arrangements to manage the financial
pressures common to all Local Authorities that are expected to continue into 2026/27 and beyond.

Page 26

Page 24
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
Remuneration Report
Introduction
The Council is required under statute to provide information on the remuneration of each senior elected member and
senior officer and any other officer not otherwise included whose remuneration is over £0.150m per annum. All
information disclosed in the tables 1-8 of the Remuneration Report is subject to audit. The other sections are reviewed
by external audit to ensure that they are consistent with the Financial Statements. 
Remuneration – Councillors
The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004 (Remuneration) Amendment
Regulations 2025 (SSI No. 2025/36). The Regulations provide for the grading of Councillors for the purposes of
remuneration arrangements, as the Leader of the Council, the Civic Head (Provost), Senior Councillors and Councillors.
The Leader of the Council and the Provost cannot be the same person for the purposes of payment of remuneration. A
Senior Councillor is a Councillor who holds a significant position of responsibility in the Council’s political management
structure. The regulations stipulate that in addition to the Leader of the Council and the Provost, the Council can appoint
a maximum of ten Senior Councillors. The level of remuneration paid to the Leader of the Council, Provost and Senior
Councillors is detailed in Table 1.
The salary to be paid to the Leader of the Council is set out in the Regulations. For 2025/26 the salary for the Leader of
the Council was £50,063 per annum (2024/25: £42,698). and for the Provost (£37,458) per annum (2024/25 £32,024).
In terms of the same regulations, the Scottish government permits West Dunbartonshire Council to nominate up to ten
Senior Councillors at any one time (in addition to the leader of the Council and the Provost whose salaries in aggregate
must not exceed a specified amount, currently £317,646 per annum (£266,843 in 2024/25) and whose salaries
individually must not exceed £37,458  (2024/25 £21,235 to £26,686). The Council is able to exercise local flexibility in
the determination of the precise number of Senior Councillors and their salary within these maximum limits.
During 2022/23, the Council agreed the appointment of a Council Leader, Provost and 10 Senior Councillors and the
remuneration due to be paid to the 10 Senior Councillors each paid a salary of £31,289 per annum (2024/25
£26,685).The Regulations also permit the Council to pay contributions or other payments as required to the Local
Government Pension Scheme in respect of those Councillors who elect to become Councillor members of the pension
scheme. The pension entitlements for the year to 31 March 2026 are shown in Table 6 on pages 29.
The Scheme of Members Allowances which encompasses the salaries of all elected members including the Leader,
Provost and Senior Councillors was agreed at a meeting of the full Council on 25 September 2024. The report to Council
can be found at appointment of councillors and the Register of Members Allowances can be found at : Councillors
Allowances

Page 27

Page 25
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
Table 1: Remuneration of Senior Councillors
2024/25 2025/26
Total
Remuneration Senior Members Responsibility
Salary, Fees
and
Allowances
Taxable
Expenses
Total
Remuneration
41,982                 Martin Rooney Leader of the Council 50,063        -           50,063             
Convenor of Community Planning Board
Convenor of Cultural Committee
Convenor of Recruitment & Individual Performance
10,675                 Douglas McAllister Provost until 28/8/24 -              -           -                  
29,857                 Karen Murray Conaghan Provost 37,432        -           37,432             
26,494                 Gurpreet Singh Johal Convenor of Housing and Community Services Committee 31,192        -           31,192             
Convenor Appeals Committee from 20/03/26
23,577                 Daniel Lennie Convenor Corporate Services Committee until 31/8/24 -              -           -                  
26,502                 David McBride Depute Leader 31,289        -           31,289             
Convenor of Infrastructure, Roads and Economic
Development Committee
Convenor of Joint Consultative Committee
23,753                 Michelle McGinty
Convenor HSCP Audit and Performance Committee from
20/03/2026
25,899        -           25,899             
Convenor Educational Services Committee from 20/03/26
26,686                 John Millar Convenor of Licensing Board 31,289        -           31,289             
26,502                 Lawrence O'Neill Convenor of Planning Committee 31,289        -           31,289             
Convernor of Local Review Body
Convenor of Licensing Committee
26,494                 Clare Steel Convenor Educational Services Committee until 20/03/26 30,945        -           30,945             
24,094                 Hazel Sorrell Depute Provost 31,192        -           31,192             
Convenor of Tendering Committee
24,463                 Gordon Scanlon Leader of the Opposition 31,278        -           31,278             
Convenor of Audit Committee
19,766                 Fiona Hennebry Convenor Appeals Committee until 20/03/26 30,945        -           30,945             
Convenor HSCP Audit and Performance Committee until
20/03/26
8,659                   William Rooney Convenor Corporate Services Committee 31,192        -           31,192              
Note: The term Senior Councillor means a Leader of the Council, the Civic Head or a Senior Councillor, all as defined by regulation 2 of the Local Governance
(Scotland) Act 2004 (Remuneration) Regulations 2007(3).
Salaries, allowances and expenses in 2025/26 have only been included for Senior Councillors. 
Senior Councillors’ remuneration in the tables above does not include non-taxable expenses. The values in the table
above relate to the actual payments made during 2025/26 which differ slightly from those stated on page 26 due to
timing differences in regards to payroll. There is no compensation/loss of office payments within the period and there
were no benefits or bonuses paid during the year.
Councillors’ remuneration
Councillors’ payments are made in accordance with the Local Governance (Scotland) Act 2004 (Remuneration)
Regulations 2007 and The Local Government (Allowances and Expenses) (Scotland) Regulations 2007. 
The total amount of councillors’ remuneration paid by the Council during the year was: 
Table 2: Councillors Total Remuneration
2024/25 Members Allowance 2025/26
£ £
532,219 Salaries 648,694
10,084 Expenses 9,910
542,303 Total Allowances 658,604

Page 28

Page 26
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
The annual return of councillors’ salaries and expenses for 2025/26 is available for any member of the public to view at
all Council libraries and public offices during normal working hours. It is also available on the Council’s website at:
Councillors Allowances.
Remuneration - Senior Employees and senior Employees of Subsidiaries
The salary of senior employees is set by reference to national arrangements. The Scottish Joint Negotiating Committee
(SJNC) for Local Authority Services sets the salaries for the Chief Executives of Scottish local authorities. Circular IR
11-25 sets the amount of salary for the Chief Officials of the Council for the period 1 April 2025 to 31 March 2026. The
post of Chief Officer Health and Social Care Partnership is a joint post between the Council and NHS Greater Glasgow
and Clyde. 
Details of the post of Chief Officer HSCP are included in the remuneration report of the Integration Joint Board. The
Council funds 50% of this post and NHS Greater Glasgow fund the remaining 50%.
The only benefits received by employees are, salary, employer contributions to the pension fund and, where applicable,
payment for election duties. There were no bonuses, compensation for loss of office or other benefits paid to senior
employees during the year. The remuneration details for senior employees are noted in Table 3. 
Table 3: Senior Officers Remuneration
Total
Remuneration
2024/25 Name Position at 31 March 2024
Salary, Fees &
Allowances
2025/26
Total Remuneration
2025/26
£ £ £
157,897 Peter Hessett Chief Executive 162,932 162,932
102,670 Lesley James Head of Children’s Healthcare & Criminal Justice -
Chief Social Work Officer
105,909 105,909
111,522 Laura Mason Chief Officer - Education, Learning & Attainment
(until 07/08/25) *
41,327 41,327
0 Gillian Hamilton Chief Officer - Education, Learning & Attainment
(from 30/09/25) *
55,098 55,098
112,084 Laurence Slavin Chief Officer - Resources - S95 Officer 115,654 115,654
113,452 Alan Douglas Chief Officer - Regulatory & Regeneration * 112,095 112,095
111,844 Victoria Rogers Chief Officer - People & Technology 115,654 115,654
111,564 Gail MacFarlane Chief Officer - Roads & Neighbourhood  115,654 115,654
111,564 Peter Barry Chief Officer - Housing & Employability 115,654 115,654
111,564 Amanda Graham Chief Officer - Citizen, Culture & Facilities 115,654 115,654
90,237 John Anderson General Manager of West Dunbartonshire Leisure 93,107 93,107
Remuneration of Senior Employees of Subsidairies
Remuneration of Senior Employees 
*Note: The FTE salary for these posts is £115,654.
Details of the post of Chief Officer HSCP are included in the remuneration report of the Integration Joint Board. 
Remuneration of Employees receiving more than £50,000
Council employees receiving more than £50,000 remuneration for the year were paid the amounts summarised in Table
4. In accordance with the disclosure requirement of the Regulations, the information in Table 4 shows the number of
employees in bands of £5,000. This information includes the senior employees who are subject to the fuller disclosure
requirements in the tables above.

Page 29

Page 27
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
Table 4: Remuneration of Officers receiving more than £50,000
2024-25 2025-26
Number of Officers Number of Officers
214 £50,000 -   £54,999 391
75 £55,000 -   £59,999 112
88 £60,000 -   £64,999 86
54 £65,000 -   £69,999 45
29 £70,000 -   £74,999 36
45 £75,000 -   £79,999 24
16 £80,000 -   £84,999 38
2 £85,000 -   £89,999 10
2 £90,000 -   £94,999 1
1 £95,000 -   £99,999 0
5 £100,000 - £104,999 1
1 £105,000 - £109,999 5
8 £110,000 - £114,999 2
0 £115,000 - £119,999 6
1 £120,000 - £124,999 0
0 £125,000 - £129,999 0
0 £130,000 - £134,999 0
1 £135,000 - £139,999 1
0 £140,000 - £144,999 0
0 £145,000-£149,500 0
1 £150,000-£154,999 0
0 £155,000-£159,999 0
0 £160,000-£164,999 1
543 Total 759
Range
Pension Benefits
Pension benefits for Councillors and most local government employees are provided through the Local Government
Pension Scheme (LGPS). Councillors’ pension benefits are based on career average pay. The Councillor’s pay for each
year or part year ending 31 March (other than the pay in the final year commencing 1 April) is increased by the increase
in the cost of living, as measured by the appropriate index (or indices) between the end of that year and the last day of
the month in which their membership of the scheme ends. The total of the revalued pay is then divided by the period of
membership to calculate the career average pay. This is the value used to calculate the pension benefits.  Table 5
details the pension entitlement and contributions made by the Council in respect of all senior Councillors and senior
officers of the Council who have opted to join the LGPS.   
For local government employees, the LGPS 2015 is a career average pension scheme. This means that pension
benefits from 01/04/2015 are based on pensionable pay with inflation added. Pension is accrued at a rate of 1/49 of
pensionable pay for each scheme year. Pension benefits can be accessed from age 55 but are reduced prior to 60th
birthday. Pension benefits accrued before 1 April 2015 are protected and are based on final pay on retiring.
Pension benefits for teachers are provided through Scottish Teachers Superannuation Scheme (STSS). The STSS is a
contributory scheme administered by the Scottish Public Pension Agency (SPPA). From 1 April 2015 the scheme is a
career average pension scheme. Pension benefits are increased in line with inflation. Pension is accrued at 1/57 of
pensionable earnings each year. Pension benefits can be accessed earlier than the normal state pension age but will
be reduced if taken earlier than the normal pension age (state pension age).
From 1 April 2009, a five-tier contribution system was introduced with contributions from scheme members being based
on how much pay falls into each tier. This is designed to give more equality between the cost and benefits of scheme
membership. Table 5 provides information on these tiered contribution rates.

Page 30

Page 28
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
Table 5: Pension Contribution Rates
Contribution
rate 2024/25
Contribution
rate 2025/26
The tiers and members contribution rates for 2025/26 (2024/25 whole time pay:
Local Government employees
5.50% On earnings up to and including £27,500 (£27,000) 5.50%
7.25% On earnings above £27,501 (£27,001) and up to £33,600 (£33,000) 7.25%
8.50% On earnings above £33,601 (£33,001) and up to £46,100 (£45,300) 8.50%
9.50% On earnings above £46,101 (£45,301) and up to £61,400 (£60,400) 9.50%
12.00% On earnings above £61,401 (£60,401) 12.00%
The tiers and members contribution rates for 2025/26 (2024/25) actual pay:
Teachers
7.35% On earnings up to and including £34,689 (£34,286) 7.35%
8.88% On earnings above £34,870 (£34,287) and up to £46,940 (£46,155) 8.88%
9.90% On earnings above £46,941 (£46,156)  and up to £55,659 (£54,728) 9.90%
10.61% On earnings above £55,660 (£54,729)  and up to £67,975 (£67,975) 10.61%
11.73% On earnings above £67,976 (£67,976)  and up to £92,693 (£92,693) 11.73%
12.14% On earnings above £92,694 (£92,694) 12.14%
If a person works part-time their contribution rate is worked out on the whole-time pay rate for the job, with actual
contributions paid on actual pay earned. There is no automatic entitlement to a lump sum. Members may opt to give up
(commute) pension for lump sum up to the limit set by the Finance Act 2004. The accrual rate guarantees a pension
based on 1/49th of pay from 1 April 2015. Prior to this the accrual rate guarantees a pension based on 1/60th of final
pensionable salary and years of pensionable service. Prior to 2009 the accrual rate guaranteed a pension based on
1/80th and a lump sum based on 3/80th of final pensionable salary and years of pensionable service. 
The value of the accrued benefits has been calculated on the basis of the age at which the person will first become
entitled to receive a pension on retirement without reduction on account of its payment at that age; without exercising
any option to commute pension entitlement into a lump sum; and without any adjustment for the effects of future inflation.
You can retire and receive your benefits in full from your normal pension age. The normal pension age is 65 for any
benefits built up before 1 April 2015. For pension build up from 1 April 2015, the Normal Pension Age is not fixed at age
65 but, instead, is the same as the State Pension Age (but with a minimum of age 65).
The value of benefits Table 6 has been provided by the Strathclyde Pension Fund Office and is calculated on the basis
of the age at which the person will first become entitled to a full pension on retirement without reduction on account of
its payment at that date: without exercising any option to commute pension entitlement into a lump sum: and without
any adjustment for the effects of future inflation. The pension figures shown relate to the benefits that the person has
accrued as a consequence of their total Local Government service, and not just their current appointment. 
The pension figures shown relate to the benefits that the person has accrued as a consequence of their total public
sector service, and not just their current appointment.  The pension entitlements for the year to 31 March 2026 together
with the contribution made by the Council to each person’s pension during the year is shown in Table 6 for Senior
Councillors and Table 7 for Senior Officers. The tables contain information for those persons who were Senior Officers
or Senior Councillors in 2025/26. Senior councillors omitted from the table below are not members of the Local
Government Pension Scheme.

Page 31

Page 29
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
Table 6: Pension Benefits for Senior Councillors
Name Position at 31/03/25 For year to
31 March
2026
For year to
31 March
2025
As at 31
March
2026
Difference from
31 March 2025
£ £ £'000 £'000
Martin Rooney Leader of Council 3,254 2,728 16 1
Convenor of Recruitment & Individual Performance
Management Committee
Convenor of Cultural Committee
Convenor of Community Planning  Board
Douglas McAllister Provost until 28/8/24 0 693 0 -4
Karen Conaghan provost 2,440 1,941 5 1
Gurpreet Singh Johal Convenor of Housing and Community Services Committee 2,033 1,722 2 0
Convenor Appeals Committee from 20/3/26
Daniel Lennie Convenor of Corporate Services Committee until 31/8/2024 0 1,533 0
David McBride Depute Leader 2,034 1,723 21 10
Convenor of Infrastructure, Roads and Economic Development
Committee
Convenor of Joint Consultative Committee
Michelle McGinty Convenor of Educational Services Committee from 20/03/26 1,688 1,544 2 0
Convenor Health & Social Care Partnership Audit and
Performance Committee 20/3/26
John Millar Convenor of Licensing Board 2,034 1,735 5 1
Lawrence O'Neill Convenor of Planning Committee 2,034 1,723 6 -                   
Convernor of Local Review Body
Convenor of Licensing Committee
Clare Steel Convenor Educational Services Committee until 20/3/26 2,016        1,722         2               -                   
Convenor of Local Negotiating Committee for Teachers until
13/3/26
Hazel Sorrell Depute Provost 2,033        1,566         2               1                       
Convenor of Tendering Committee
Gordon Scanlon Leader of the Opposition 2,033        1,590         2               1                       
Convenor of Audit& Performance Committee
Fiona Hennebry* Convenor of the Appeals Committee from 20/03/26 -           357 0 0
Convenor of West Dunbartonshire Health & Social Care Partnership
Board (IJB) until 20/03/26
William Rooney Convenor of Corporate Services Committee 2,033 563 1 1
In-year pension
contributions
Accrued pension benefits
*Councillors’ Hennebry opted out of the Local Government pension Scheme in 2025/26
Councillor Lennie was not a senior councillor in 2025/26 
Table 7 Pension Benefits for Senior Officers
In Year Pension Contributions Accrued Pension Benefits
Senior Members Responsibility For Year to 31
March 2026
£000
For Year to 31
March 2025
£000
As at 31
March 2026
£000
Difference
from 31
March 2025
£000
Peter Hessett Chief Executive 10,619               10,002             178              17                
Lesley James Head of Children's Healthcare and Criminal Justice - Chief Social Work Officer 6,935                 6,674               95                5                  
Laura Mason Chief Officer - Education, Learning and Attainment (until 7/8/25) 2,686                 7,249               164              (6)
Gillian Hamilton Chief Officer - Education, Learning and Attainment (from 30/9/25) 3,620                 0 1                  1                  
Laurence Slavin Chief Officer - Resources - Section 95 Officer 7,536                 7,252               55                4                  
Alan Douglas Chief Officer - Regulatory and Regeneration 7,296                 7,252               130              (3)
Victoria Rogers Chief Officer - People and Technology 7,536                 7,252               98                6                  
Gail MacFarlane Chief Officer - Roads and Neighbourhood 7,536                 7,252               33                3                  
Peter Barry Chief Officer - Housing and Employability 7,536                 7,252               83                5                  
Amanda Graham Chief Officer - Citizen, Culture and Facilities 7,536                 7,252               22                3                  
John Anderson General Manager - West Dunbartonshire Leisure 6,052                 5,824               80                5                   
Laura Mason retired during 2025/26 and was replaced by Gillian Hamilton
Alan Douglas took flexible retirement during 2025/26. 
Exit Packages
The number of exit packages with cost per band for compulsory and other redundancies are detailed in Table 8. The
Council only agrees exit packages where they are consistent with wider workforce planning and service delivery

Page 32

Page 30
Remuneration Report                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
objectives; and where the savings accruing from an individual ceasing employment with the Council exceed the costs
of the exit package within an acceptable period.
For the purposes of this note Exit Packages include:
• Redundancy payment. 
• Strain on the fund cost (the amount which the Council is required to pay to the pension fund because the
employee has retired before the assumed retirement age).
• Added Years Lump Sum (the amount which the Council pays to the individual in a one-off lump sum, according
to the compensatory added years awarded – maximum three years).
Table 8: Exit Packages
Departures Total Cost (£) Departures Total Cost (£)
20 106,418                  £0  -  £20,000 23 136,912               
8 213,868                  £20,001-£40,000 8 210,361               
3 153,502                  £40,001-£60,000 3 138,416               
2 142,066                  £60,001-£80,000 5 355,119               
5 437,759                  £80,001-£100,000 1 82,199                  
2 239,662                  £100,001  - £150,000 2 263,030               
2 351,503                  £150,001- £200,000 0 -                        
42 1,644,778 Total 42 1,186,037
2025-262024-25
Banding
Termination Benefits of Employees 
Termination benefits are amounts payable as a result of a decision by the Council to terminate an officer’s employment
before their normal retirement date or an officer’s decision to accept voluntary redundancy in exchange for those
benefits. They are charged on an accruals basis to the appropriate service line in the CIES at the earlier of when the
Council can no longer withdraw the offer of those benefits or when the Council recognises the costs for a restructuring.
The Council terminated the contracts of a number of employees in 2025/26. The above table includes £0.036 million
liabilities relating to these releases (2024/25: £0.466m). 
Martin Rooney        Peter Hessett
Leader of the Council       Chief Executive
Date: 17 June 2026        Date: 17 June 2026

Page 33

Page 31
Comprehensive Income and Expenditure Statement                                             
West Dunbartonshire Council Annual Accounts 2025/26
Official
Comprehensive Income and Expenditure Statement 
This statement shows the accounting cost in year, of providing services in accordance with relevant International Financial Reporting Standards, rather than the amount to be
funded from taxation. The Council raises taxation to cover expenditure in accordance with regulations; this may be different from the accounting cost. The taxation position is
shown in the Movement in Reserves Statement and the Expenditure and Funding Analysis. 
2024/25 2024/25 2024/25 2025/26 2025/26 2025/26
Gross Gross Net Gross Gross Net
Expenditure Income Expenditure Expenditure Income Expenditure
£'000 £'000 £'000 Note £'000 £'000 £'000
Service
41,150 (35,441) 5,709 Resources 35,026 (28,552) 6,474
10,550 (1,418) 9,132 Regulatory and Regeneration 11,958 (1,688) 10,270
12,585 (61) 12,524 People & Technology 12,293 27 12,320
15,807 (55) 15,752 Citizens, Culture and Facilities 22,280 (486) 21,794
145,576 (9,998) 135,578 Education, Learning and Attainment 145,002 (8,772) 136,230
30,126 (3,911) 26,215 Roads and Neighbourhood 33,755 (7,533) 26,222
14,467 (9,190) 5,277 Housing and Employability 7,697 (6,956) 741
5,997 (11,677) (5,680) Miscellaneous Services 14,952 (20,138) (5,186)
221,048 (125,238) 95,810 Health and Social Care Partnership 233,598 (134,932) 98,666
2,406 0 2,406 Requisitions 2,477 0 2,477
41,960 (53,019) (11,059) Housing Revenue Account 67,853 (61,991) 5,862
541,672 (250,008) 291,664 Net Cost of Service 586,891 (271,021) 315,870
2,100 Other Operating Expenditure and (income) - (Gain) / loss on Disposal of
non-current assets
8,229
44,252 Financing and Investment (Income) and Expenditure 8 41,290
(312,167) Taxation and Non-specific Grant Income 9 (350,927)
25,849 (Surplus)/Deficit on Provision of Services 14,462
(8,510) (Surplus)/Deficit arising from revaluation of non-current assets 11 33,776
0 (Surplus)/Deficit on revaluation of assets held at fair value through
other comprehensive income
0
(20,752) Remeasurement of the net defined benefit pension liability 22 (10,414)
(29,262) Other Comprehensive (Income) and Expenditure 23,362
(3,413) Total Comprehensive (Income) and Expenditure 37,824

Page 34

Page 32
Balance Sheet                                                           
West Dunbartonshire Council Annual Accounts 2025/26
Official
Balance Sheet
The balance sheet shows the value, as at the balance sheet date, of the assets and liabilities recognised by the Council.
The net assets of the Council (assets less liabilities) are matched by the reserves held by the Council. Reserves are
reported in two categories:  
1. Usable reserves - reserves the Council may use to provide services, subject to the need to maintain a prudent level
of reserves and any statutory limitations on their use (for example the capital receipts that may only be used to
fund capital expenditure or repay debt).
2. Unusable reserves - reserves that the Council is not able to use to provide services. This category of reserves
includes reserves holding unrealised gains and losses (for example the revaluation reserve), where amounts would
only become available to provide services if the assets are sold; and reserves that hold timing differences shown
in the MIRS line ‘adjustments between accounting basis and funding basis under regulations. 
31 March 2025 Balance Sheet 31 March 2025
£'000 Note £'000
1,277,285 Property, Plant and Equipment 11 1,267,404
2,128 Right of Use Assets 16 1,936
1,256 Intangible Assets 12 1,103
2,022 Long Term Debtors 2,614
1,524 Heritage Assets 13 1,524
470 Long Term Investments 471
1,284,685 Long Term Assets 1,275,052
1,042 Asset Held for Sale 14 5,332
1,167 Inventories 1,352
67,246 Short Term Debtors 17 76,865
8,227 Cash and Cash Equivalents (net) 18 27,417
77,682 Current Assets 110,966
(62,297) Short Term Creditors 19 (62,733)
(650) Provisions 20 (618)
(4,346) PPP 15 (4,740)
(252) Short-term Lease Creditor ROU Asset 16 (223)
(334,350) Short Term Borrowing 21 (348,607)
(401,895) Current Liabilities (416,921)
(78,508) PPP and Finance Lease Liabilities 15 (73,768)
(467,240) Long Term Borrowing 21 (521,476)
(37,416) Net Pensions Liability 22 (37,020)
(1,927) Short-term Lease Creditor ROU Asset 16 (1,803)
(8,328) Capital Grants Receipts in Advance 10 (5,801)
(593,419) Long Term Liabilities (639,868)
367,053 Net Assets 329,229
Represented by:
(13,125) Usable Reserves MIR/6 (26,285)
(353,928) Unusable Reserves MIR/6 (302,944)
(367,053) Total Reserves (329,229)

Page 35

Page 33
Movement in Reserves Statement                                                                           
West Dunbartonshire Council Annual Accounts 2025/26
Official
Movement in Reserves Statement
This statement shows the movement in the year on the different reserves held by the Council, analysed into ‘usable reserves’ (i.e. those that can be applied to fund expenditure
or reduce local taxation) and other reserves. The surplus or (deficit) on the Provision of Services line in the Comprehensive Income and Expenditure Statement (page 31) shows
the accounting cost of providing the Council’s services during the year.  These are different from the statutory amounts required to be charged to the General Fund balance and
the Housing Revenue Account for council tax setting and dwelling rent setting purposes. The net increase/decrease before transfer to other statutory reserves line shows the
statutory general fund balance and housing revenue account balance before any discretionary transfers to or from earmarked reserves undertaken by the Council. 
General Fund
balance
HRA
Balance
Capital Grants
and Receipts
Unapplied
Account
Capital
Reserve Capital Fund
Other
Reserves
Total Usable
Reserves
Unusable
Reserves Total Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
2025/26 0
Balance at 31 March 2025 Carried Forward (12,272) (611) 0 0 0 (242) (13,125) (353,928) (367,053)
Movement in Reserve 2025/26
Total Comprehensive Expenditure and Income 952 13,510 0 0 0 0 14,462 23,362 37,824
Adjustments between accounting basis and funding basis under
regulations (Note 6) (7,375) (14,021) 0 (278) (5,948) 0 (27,622) 27,622 0
Net (Increase)/Decrease before Transfers to Other
Statutory Reserves (6,423) (511) 0 (278) (5,948) 0 (13,160) 50,984 37,824
Transfers to/(from) other statutory reserves (6,229) 0 0 278 5,948 3 0 0 0
Closing Balance at 31 March 2026 (24,924) (1,122) 0 0 0 (239) (26,285) (302,944) (329,229)
2024/25
Balance at 31 March 2024 Carried Forward (15,372) (970) (213) 0 0 (194) (16,749) (346,891) (363,640)
Movement in Reserve 2024/25
Total Comprehensive Expenditure and Income 27,568 (1,719) 0 0 0 0 25,849 (29,262) (3,413)
Adjustments between accounting basis and funding basis under
regulations (Note 6) (23,051) 2,078 (1,252) 0 0 0 (22,225) 22,225 0
Net (Increase)/Decrease before Transfers to Other
Statutory Reserves 4,517 359 (1,252) 0 0 0 3,624 (7,037) (3,413)
Transfers to/(from) other statutory reserves (1,417) 0 1,465 0 0 (48) 0 0 0
Closing Balance at 31 March 2025 (12,272) (611) 0 0 0 (242) (13,125) (353,928) (367,053)
Usable Reserves

Page 36

Page 34
Cashflow Statement     
West Dunbartonshire Council Annual Accounts 2025/26
Official
Cash Flow Statement
The cash flow statement shows the changes in cash and cash equivalents of the Council during the reporting period.
The statement shows how the Council generates and uses cash and cash equivalents by classifying cash flows as
operating, investing and financing activities. The amount of net cash flows arising from operating activities is a key
indicator of the extent to which the operations of the Council are funded by way of taxation and grant income or from
the recipients of services provided by the Council. Investing activities represent the extent to which cash outflows have
been made for resources which are intended to contribute to the Council’s future service delivery. Cash flows arising
from financing activities are useful in predicting claims on future cash flows by providers of capital (i.e. borrowing) to the
Council.
2024/25 Cashflow Statement 2025/26 2025/26
£'000 £'000 £'000
Operating Activities
25,849 Net deficit on the provision of services 14,462
(36,274) Depreciation, amortisation and impairment (61,043)
(2,100) Net gain/loss on fixed assets (8,229)
(15,156) Movement in pension liabilities (10,018)
(130) Movement in inventories 185
(6,485) Movement in debtors 10,211
1,046 Movement in creditors and provisions 2,123
(59,099)
Adjustments to net deficit on the provision of services
for non-cash movements (66,771)
0 Financing movements 0
21,249 Investing movements 41,686
21,249
Adjustments for items included in the net surplus/deficit
on the provision of services that are investing and
financing activities 41,686
(12,001) Net cash (inflow)/outflow from Operating Activities (10,623)
119,798 Purchase of property, plant and equipment and intangible assets 97,269
(1,252) Proceeds from sale of property, plant and equipment and intangible assets (278)
(13) Movement on long term investments 1
(21,249) Other receipts from investing activities (41,686)
97,284 Net cash (inflow)/outflow from investing activities 55,306
(453,412) Cash receipts of short-term and long-term borrowing (521,964)
3,590 Repayment of PPP liabilities 4,346
380,452 Repayment of short-term and long-term borrowing 453,472
257 Movement in IFRS16 lease liability 273
(69,113) Financing Activities (63,873)
16,170 Net cash (inflow)/outflow from financing activities (19,190)
24,397
Cash and cash equivalents at the beginning of the
reporting period 8,227
8,227
Cash and cash equivalents at the end of the reporting
period 27,417
16,170 Movement – (Increase)/ Decrease in Cash (19,190)  
Reconciliation of Liabilities arising from Financing Activities
31 March 2025
Financing Cash
flows
Other non-cash
adj
Non-cash adj to
FIAA 31 March 2026
£'000 £'000 £'000 £'000 £'000
Long term Borrowing 467,240 54,236 0 0 521,476
Short term Borrowing 334,350 14,037 0 220 348,607
PPP Liability 82,853 (4,345) 0 0 78,508
ROU Asset Lease Liability 2,179 (273) 120 0 2,026
886,622 63,655 120 220 950,617

Page 37

Page 35
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 1 - Accounting Policies
1.1  General Principles
The Financial Statements summarises the Council’s transactions for the 2025/26 financial year and its position at the
year end of 31 March 2026. The Council is required to prepare an Annual Statement of Accounts by the Local Authority
Accounts (Scotland) Regulations 2014. Section 12 of the Local Government in Scotland Act 2003 requires they be
prepared in accordance with proper accounting practices. These practices primarily comprise the Code of Practice on
Local Authority Accounting in the United Kingdom 2025/26 (“the code”) supported by International Financial Reporting
Standards (IFRS). 
The accounting convention adopted in the Financial Statements is principally historic cost, modified by the revaluation
of certain categories of non-current assets and financial instruments. The convention also adopts the assumption that
the Council will continue as a going concern for the foreseeable future. 
1.2 Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when payment is made or received. In particular: 
• Revenue from contracts with service recipients, whether for services or the provision of goods, is recognised when
(or as) the goods or services are transferred to the service recipient in accordance with the performance obligations
in the contract.
• Expenses in relation to services received are recorded as expenditure when the services are received, rather than
when payment is made.
• Supplies are recorded as expenditure when they are consumed. Where there is a gap between the date supplies
are received and their consumption their value is carried as inventories on the Balance Sheet.
• Interest payable on borrowings and receivable on investments is accounted for respectively as expenditure and
income on the basis of the effective interest rate for the relevant financial instrument, rather than on cash flows
fixed or determined by the contract.
• When income and expenditure have been recognised but cash has not been received or paid, a debtor or creditor
for the relevant amount is recorded in the Balance Sheet. Where there is evidence that debts are unlikely to be
settled, the balance of debtors is written down and charged to revenue for the income that might not be collected.
• The Company applies a materiality threshold when recognising accruals. Only expenses and liabilities above
£5,000 are accrued at the reporting date. Items below this threshold are recognised in the period in which they are
invoiced or paid. 
1.3 Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on notice of not
more than 24 hours. 
Cash equivalents are investments that mature in three months or less from date of acquisition and that are readily
convertible to known cash amounts, with insignificant risk of change of value. The investments comprise solely of short-
term lending of surplus funds to a limited number of pre-approved UK banks. All deposits are held in sterling. The
carrying amount is the outstanding principal receivable. Bank balances are included in the Balance Sheet at the closing
balance in the Council’s ledger and include cheques payable not yet cashed. 
1.4 Changes in Accounting Policies, Estimates and Errors
Changes in accounting policies are only made when required by proper accounting practices or the change provides
more reliable or relevant information about the effect of transactions, events or conditions on the Council’s financial
position or performance. Where a change is made, it is applied retrospectively by adjusting opening balances and
comparative figures, as if the new policy has always been applied. 
Changes in accounting estimates are accounted for prospectively, i.e. in the current and future years only. 
Material errors discovered in prior period figures are corrected retrospectively by amending opening balances and
comparative figures.

Page 38

Page 36
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
1.5 Charges to Revenue for Property, Plant and Equipment
Council Services are debited/credited with the following amounts to record the cost of using or holding fixed assets
during the year: 
• depreciation, attributable to the assets used by the relevant service or trading account
• revaluation and impairment losses, where there is no accumulated gain in the Revaluation Reserve
• revaluation gains, where these reverse an impairment loss previously charged to the service or trading account
• amortisation of intangible fixed assets. 
The Council is not required to raise council tax to cover depreciation, revaluation gains or losses or impairment losses.
However, it is required to make annual provision from revenue towards the reduction in its overall borrowing requirement.
Depreciation, revaluation and impairment losses and amortisations are replaced by the revenue provision in the General
Fund by an adjustment within the Capital Adjustment Account in the Movement in Reserves Statement for the difference
between the two. 
1.6 Intangible assets
Internally generated assets are capitalised where it is demonstrable the project is technically feasible and is intended to
be completed (with adequate resources being available) and the Council will be able to generate future economic
benefits or deliver service potential by being able to sell or use the asset. Expenditure is capitalised where it can be
measured reliably as attributable to the asset and restricted to that incurred during the development phase (research
expenditure is not capitalised). 
Expenditure on the development of websites is not capitalised if the website is solely or primarily intended to promote
or advertise the Council’s goods or services. 
Assets are measured originally at cost and only revalued where the fair value of the asset can be determined by
reference to an active market. 
Where an intangible asset has a finite useful life, the depreciable amount of the asset is charged over its useful life to
the relevant service line(s) in the Comprehensive Income and Expenditure Statement. An asset is tested for impairment
whenever there is an indication that the asset might be impaired – any losses recognised are posted to the relevant
service line(s) in the Comprehensive Income and Expenditure Statement. Any gain or loss arising on the disposal or
abandonment of an intangible asset is recognised in the Surplus or Deficit on the Provision of Services when the asset
is derecognised. 
1.7 Property, Plant and Equipment
Assets that have physical substance and are held for the supply of goods and services, either directly or indirectly, and
that are expected to be used during more than one financial year are classified as Property, Plant and Equipment. 
1.7.1 Recognition
Expenditure on the acquisition, creation or enhancement of property, plant and equipment is capitalised on an accrual’s
basis, provided it is probable the future economic benefits or service potential associated with the item will flow to the
Council and the cost of the asset can be measured reliably. Expenditure that maintains but does not add to the asset’s
potential to deliver future economic benefits or service potential, is charged as an expense when it is incurred. 
1.7.2 Measurement
Assets are initially measured at cost, comprising of: 
• purchase price (the Council has no de minimis level set)
• any costs associated with bringing the asset to the location or condition necessary for it to be capable of operating
in the manner intended by management
• the initial estimate of costs for dismantling and removing the item and restoring the site on which it is located to its
original state.

Page 39

Page 37
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
The Council does not capitalise borrowing costs incurred during construction of an asset. 
The cost of assets acquired other than by purchase is deemed to be its fair value unless the acquisition will not increase
the cash flows of the Council. In the latter case, the cost of the acquisition is the carrying amount of the asset given up
by the Council. 
Donated assets are measured initially at fair value. The difference between fair value and any consideration paid is
credited to the Taxation and Non-Specific Grant Income line of the Comprehensive Income and Expenditure Statement,
unless the donation has been made conditionally. Until conditions are satisfied, the gain is held in the Donated Assets
Accounts. Where gains are credited to the Comprehensive Income and Expenditure Statement, they are reversed out
of the General Fund Balance to the Capital Adjustment Account in the Movement in Reserves Statement. 
Assets are then carried in the Balance Sheet using the following measurement bases: 
• Infrastructure, community assets & assets under construction – depreciated historic cost.
• Surplus assets – current value as estimated at highest and best use from an open market perspective (fair value). 
• All other assets – current value, determined as the amount that would be paid for the asset in its existing use
(existing use value). 
Where there is no market-based evidence of fair value because of the specialist nature of an asset, depreciated
replacement cost (DRC) is used as an estimate of current value. For non-property assets with short useful lives or low
values, depreciated historical cost basis is used as a proxy for current value. 
1.7.3 Revaluation
Property, Plant & Equipment (PPE) is carried at current value in accordance with the Code of Practice on Local Authority
Accounting in the United Kingdom 2025/26 and relevant statutory guidance for Scotland. Assets are subject to full
revaluation at least every five years, with annual indexation applied in intervening years to ensure that carrying amounts
remain materially accurate. 
The Council carries out a rolling programme which ensures that all Property, Plant and Equipment, required to be
measured at current value, is revalued at least every 5 years. During 2025/26, all valuations were provided by external
valuers, who are members of the Royal Institute of Chartered Surveyors (MRICS) and RICS registered valuers. 
Valuations of land and buildings are carried out in accordance with the methodologies and bases for estimation set out
in the professional standards of RICS. The significant assumptions applied in estimating the values are: 
• Infrastructure, community assets (except where a valuation option has been adopted) and assets under
construction is measured at historic cost. All other classes of property, plant and equipment is measured at current
value. Current value is the amount that would be exchanged for the asset in its existing use.
• Surplus assets have been valued at level 1 of the fair value hierarchy “quoted prices (unadjusted) in active markets
for identical assets or liabilities that the entity can access at the measurement date”, which is consistent with the
concept of market value.
• Where there is no market-based evidence of current value, due to the specialist nature of the property and the fact
the asset is rarely sold, the Council may need to estimate current value using a depreciated replacement cost
(DRC) approach. The value of Council dwellings shall be measured using existing use value – social housing (EUV-
SH). EUV-SH and DRC are methods of valuation that are based on current value with additional special
assumptions for each of the respective methods.
• Historic cost is used as a proxy for current value with regards to the valuation of vehicles, plant, furniture and
equipment. Councils may elect to adopt this approach for non-property assets that have short useful lives or low
values (or both).

Page 40

Page 38
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
The programme of revaluation carried out in 2025/26 and planned each of the following four years is as follows: 
2025/26 Any properties not previously re-valued / general re-appraisal/ HRA housing stock
2026/27 Offices, depots, cemeteries and crematorium lodges.
2027/28 All Council non-operational properties
2028/29 Schools, school houses, social work homes, adult training centres, community
education centres and early education centres
2029/30 Halls, Public conveniences, libraries, outdoor centres, golf course, pavilions, sports
centres, swimming pools, travellers site and car parks
In addition to assets being revalued within the programme of revaluation assets will be revalued in any given year if any
of following three criteria is met:
• When the historic cost of the building is less than £2m but the combined value of the building historic cost and any
enhancement expenditure incurred since the last revaluation date exceeds £2m then the asset will be revalued and
(if new valuations exceeds £2m) componentised if necessary.
• Where the historic cost of the building exceeds £2m (and is therefore already componentised) and where any
enhancement expenditure incurred since the last revaluation date exceeds 25% of the historic cost of the building
then the asset will be revalued.
• Where the combined value of building historic cost and any enhancement expenditure incurred since the last
revaluation date spend is less than £2m but the value of the enhancement expenditure exceeds 50% of building
historic cost and in value is more than £0.500m then the asset will be revalued. 
1.7.4 Indexation
The carrying values of Property, Plant and Equipment (PPE) is kept up to date in accordance with the CIPFA Code of
Practice. Assets measured at current value (including land and buildings, surplus assets, dwellings and specialised
assets valued using Depreciated Replacement Cost) are subject to annual indexation between formal revaluations to
ensure that values remain materially accurate. 
Indexation is applied at 31 March each year using indices provided by the Authority’s external valuer. These may include
BCIS indices, market‑based indices or other category‑specific measures considered appropriate by the valuer. Indexed
values are reviewed for materiality and reasonableness. 
Where indexation indicates a material movement in value, the carrying amount is adjusted as a revaluation movement.
Upward movements are credited to the Revaluation Reserve unless reversing a previous impairment charged to the
Surplus or Deficit on the Provision of Services. Downward movements are charged to the Revaluation Reserve to the
extent of any existing balance, with any excess charged to the Surplus or Deficit on the Provision of Services. 
Applied indices are listed below. 
Index Category Sub-Category Index %
Tender Price Index Specialised Properties (Buildings)  2.76
Urban Development Land Index Specialised Properties (Land)  -8.31
MSCI Capital Growth Index Non-residential properties Glasgow – All Sectors 2.55  
Glasgow – Retail 0.13  
Glasgow – Offices -9.66  
Glasgow - Industrial 4.67

Page 41

Page 39
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
1.7.5 Impairment
Assets are assessed at each year-end as to whether there is any indication that an asset may be impaired. Where
indications exist and any possible differences are estimated to be material, the recoverable amount of the asset is
estimated and, where this is less than the carrying amount of the asset, an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for by: 
• where a balance of revaluation gains for the asset is held in the Revaluation Reserve – the carrying amount of the
asset is written down against that balance (up to the amount of the accumulated gains); or
• where no balance of revaluation gains for the asset is held in the Revaluation Reserve – the carrying amount is
written down against the relevant service line(s) in the Comprehensive Income and Expenditure Statement. 
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service line(s) in the
Comprehensive Income and Expenditure Statement, up to the amount of the original loss, adjusted for depreciation that
would have been charged if the loss had not been recognised. 
1.7.6 Disposals
When it becomes apparent the carrying amount of an asset will be recovered principally through a sale transaction
rather than through its continuing use, it is re-classed as a Non-current Asset Held for Sale. The asset is re-valued
immediately before re-classification and then carried at the lower of this amount and the fair value less sale costs. 
Where there is a subsequent decrease to fair value less costs to sell, the loss is posted to the Other Operating
Expenditure line in the Comprehensive Income and Expenditure Statement. Gains in fair value are recognised only up
to the amount of any previous losses recognised in the Surplus or Deficit on the Provision of Services. Depreciation is
not charged on Assets Held for Sale. Assets that are to be abandoned or scrapped are not reclassified as Non-current
Assets Held for Sale.   
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet (whether
Property, Plant and Equipment or Assets Held for Sale) is written off to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement as part of the gain or loss on disposal. Receipts from disposals (if
any) are credited to the same line in the Comprehensive Income and Expenditure Statement also as part of the gain or
loss on disposal (i.e. netted off against the carrying value of the asset at the time of disposal). Any revaluation gains
accumulated for the asset in the Revaluation Reserve are transferred to the Capital Adjustment Account.
Amounts received for a disposal are categorised as capital receipts. The balance of receipts is credited to either the
Capital Receipts Reserve and can only be used for capital investment, set aside to reduce the Council’s underlying
borrowing requirement, to fund the principal element of loan charges or to fund premium charges. Receipts are
appropriated to these reserves from the General Fund balance in the Movement in Reserves Statement.
The written-off value of disposals is not a charge against council tax. It is appropriated to the Capital Adjustment Account
from the General Fund balance in the Movement in Reserves Statement. 
1.7.7 Depreciation
Depreciation is provided on all property, plant and equipment over their useful economic lives, with an exception made
for assets without a determinable finite useful life (i.e. non depreciating land and certain community assets) and assets
that are not yet available for use (i.e. assets under construction). The useful lives of assets and depreciation method
are as follows: 
Council Dwellings 10 – 80 years Straight line
Other buildings* 15 – 80 years Straight line
Open spaces 10 – 120 years Straight line
Infrastructure 15 – 120 years Straight line
Vehicles, plant, equipment 5 – 20 years Straight line
Intangibles 5 – 10 years Straight line
Other 10 – 120 years Straight line
* Including components such as structure, mechanical and electrical, etc.

Page 42

Page 40
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Where an item of property, plant and equipment assets has major components whose cost is significant in relation to
the total cost of the item, the components are depreciated separately. 
Revaluation gains are also depreciated, with an amount equal to the difference between current depreciation charged
on assets and the depreciation that would be chargeable based upon historic cost being transferred each year from the
Revaluation Reserve to the Capital Adjustment Account. 
1.7.8 Infrastructure Assets
The CIPFA/LASAAC Code of Practice for Local Authority Accounting in the United Kingdom requires infrastructure
assets to be measured using the historical cost measurement basis and carried at depreciated historical cost. Due to
information deficits it is unclear whether when an assets component is replaced, the old component has been
derecognised to avoid double counting. However, as parts of these assets are rarely replaced before the part has been
fully consumed and should therefore be fully depreciated at the date of replacement, the carrying amount to be
derecognised in respect of a replaced part of an infrastructure asset is a nil amount. 
The Scottish Government in recognising the challenge facing Council’s has agreed to permit temporary statutory
overrides whilst a permanent solution is developed within the Code. As outlined in the Local Government Finance
Circular 06/2025 the Council has adopted statutory overrides for the period 1 April 2021 to 31 March 2027 which permits
the council not to report gross cost and accumulated depreciation for Infrastructure assets. 
1.8 Assets Held for Sale
These assets are measured at fair value, based on the amount at which the asset could be exchanged between
knowledgeable parties at arm’s length, less costs to sell at the initial classification and at the end of each reporting date.
Revaluation gains shall be recognised for any initial or subsequent increase in fair value less costs to sell but not in
excess of the cumulative impairment loss or revaluation loss that have been recognised in the Surplus of Deficit on the
Provision of Services. Impairment losses (or revaluation losses) will be recognised for any subsequent decrease to fair
value less costs to sell following reclassification in the Surplus or Deficit on the Provision of Service even where there
is a balance on the assets Revaluation Reserve. 
1.9 Heritage Assets
Heritage Assets are recognised and measured (including the treatment of revaluation gains and losses) in accordance
with the Council’s accounting policies on property, plant and equipment. However, some of the measurement rules are
relaxed in relation to heritage assets as detailed below. 
Type of Asset Valuation Method for Balance Sheet Purposes
Ship models/ Silver and
Commemorative wear 
The last formal valuations were by Bonhams, Sotheby’s and Phillips. Further formal
valuations will be commissioned where it is considered there could potentially be a material
change in value and where the value of the asset is estimated to be in excess of £10,000.
Works of art  The last formal valuations were by Bonhams, Sotheby’s and Phillips. Where a lower and
upper valuation has been provided the mid valuation has been used. Further formal
valuations will be commissioned where it is considered there could potentially be a material
change in the value of the assets held.
Civic Regalia The robes are not recognised on the balance sheet as they are considered to have no
significant value.  However, the chains are reported in the balance sheet at insurance value.
Sewing Machine Collection These collections are not recognised on the balance sheet as cost information is not readily
available. Nearly all the items are believed to have an immaterial value.
Listed Buildings and
Scheduled Ancient
Monuments
These assets are not recognised on the balance sheet as it is considered that there is a lack
of available, comparable market values to establish a ‘fair value’.  It is unlikely that Council
would procure such assets but is more likely to refurbish or enhance existing structures. In
this respect, the cost of those works will be capitalised at cost. 
Purchased assets are initially recognised at cost and donations are recognised at valuation where that value is estimated
to be greater than the threshold of £10,000 as specified above. The carrying amounts are reviewed where there is
evidence of impairment e.g. where an item has suffered physical deterioration or breakage or where doubts arise as to

Page 43

Page 41
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
its authenticity. Any impairment is recognised and measured in accordance with the Council’s general policies on
impairment. 
No depreciation shall be chargeable on any heritage asset, in view of the indeterminate life and residual value. 
The proceeds from any disposal of heritage assets are accounted for in accordance with the council’s general provisions
relating to the disposal of property, plant and equipment. 
1.10 Right of Use Assets
The Council adopted IFRS 16 (Leases) with effect from 1 April 2024.  The main impact of the requirements of IFRS 16
is that, for arrangements previously accounted for as operating leases (i.e. without recognising the leased vehicles,
plant, equipment, property and land as an asset, and future rents as a liability), a right-of-use asset and a lease liability
are now included on the balance sheet from 1 April 2024. Right of use assets are initially measured at cost, comprising
the lease liability at commencement, any lease payments made at or before commencement and any initial direct costs.
Subsequently, right of use assets are measured using the cost model and depreciated on a straight-line basis over the
shorter of the lease term and the useful life of the underlying asset. 
The Council has applied recognition exemptions to short-term leases i.e. existing leases that expire on or before 31
March 2025, and new leases with a duration of less than 12 months. A contract is, or contains a lease, if the contract
conveys the right to control the use of an identified asset for a period of time in exchange for consideration.   
1.11     Employee Benefits
1.11.1  Benefits payable during employment
Short term employee benefits (i.e. fall due within 12 months of the year-end), such as wages and salaries, paid leave,
paid sick leave, bonuses and non-monetary benefits for current employees are recognised as an expense in the year
in which the employees render service to the Council. An accrual is made against the services in the Surplus or Deficit
on the Provision of Service for the costs of holiday entitlement and other forms of leave earned by the employee but not
taken before the year end and which employees can carry forward into the next financial year. Any accrual made is
required under statute to be reversed out of the General Fund balance by a credit to the Statutory Mitigation Account in
the Movement in Reserves Statement. 
1.11.2 Termination Benefits
Termination benefits are amounts payable as a result of a decision made by the Council to terminate an officer’s
employment before the normal retirement date or an officer’s decision to accept a voluntary termination package in
exchange for those benefits. Termination benefits do not provide the Council with future economic benefits and
consequently they are recognised on an accrual basis immediately in the Surplus or Deficit on the Provision of Services
line in the Comprehensive Income and Expenditure Account when the Council is demonstrably committed to provision
of the termination benefits. 
Where termination benefits involve the enhancement of pensions, they are treated as pension costs for the purpose of
the statutory transfer between the Pension Reserve and the General Fund of the amount by which the pension costs
calculated in accordance with the Code are different from the contributions due under the pension scheme regulations.
In the Movement in Reserves Statement appropriations are required to and from the Pension Reserve to remove
notional debits and credits for termination benefits related to pensions enhancements and replace them with the cost of
the cash paid, including any amounts due and not paid at the year end. 
1.11.3 Post Employment Benefits
Employees of the Council are members of two separate defined benefit pension schemes: 
• the Teachers’ Pension Scheme, administered by the Scottish Pensions Agency
• the Local Government Pensions Scheme, administered by Glasgow City Council. 
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned as employees
working for the Council. However, the arrangements for the teachers’ scheme mean that liabilities for these benefits

Page 44

Page 42
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
cannot ordinarily be identified specifically to the Council. The scheme is therefore accounted for as if it were a defined
contribution scheme and no liability for future payments of benefits is recognised in the Balance Sheet. 
In relation to retirement benefits, statutory provisions require the General Fund to be charged with the amount payable 
by the Council to the pension fund or directly to pensioners in the year, not the amount calculated in accordance to the 
relevant accounting standards. In the Movement in Reserves Statement this means that there are appropriations to and 
from the Pension Reserve to remove any notional debits and credits for retirement benefits and replace them with the
cash paid or payable at the year end, to the pension fund and pensioners. The negative balance that arises on the
Pension Reserve measures the beneficial impact on the General Fund of being required to account for retirement
benefits on the basis of cash flows rather than as benefits earned by employees. 
The Local Government Pension Scheme 
The Local Government Scheme is accounted for as a defined benefits scheme: 
• The liabilities of the Strathclyde Pension Fund attributable to the Council are included in the Balance Sheet on an
actuarial basis using the projected unit method - i.e. an assessment of the future payments that will be made in
relation to retirement benefits earned to date by employees, based on assumptions about mortality rates, employee
turnover rates, etc. and projections of projected earnings for current employees. 
• Liabilities are discounted to their value at current prices, using a discount rate of 4.75% (based on the indicative
rate of return on high quality corporate bonds). 
• The assets of Strathclyde Pension Fund attributable to the Council are included in the Balance Sheet at their fair
value: 
o quoted securities - current bid price 
o unquoted securities - professional estimate 
o unitised securities - current bid price 
o property - market value 
The change in the net pension liability is analysed into the following components:
Service cost comprising: 
• Current service cost - the increase in liabilities as a result of years of service earned this year - allocated in the
Comprehensive Income and Expenditure Statement to the services for which the employees worked. 
• Past service cost - the increase in liabilities as a result of a scheme amendment or curtailment whose effect relates
to years of service earned in earlier years - debited to the Surplus or Deficit on the Provision of Services in the
Comprehensive Income and Expenditure Statement as part of Non-Distributable Costs.
• Gains/losses on settlements - the decrease in liabilities as a result of the Council entering into a transaction that
eliminates all further legal or constructive obligation relating to the event, notwithstanding the financial guarantee
(see Note 5) - credited to the Surplus on the Provision of Services in the Comprehensive Income & Expenditure
Statement as part of Non Distributable Costs. 
• Net interest on the net defined benefit liability, i.e. net interest expenses for the council. The change during the
period is the net defined benefit liability that arises from the passage of time charged to the Financing and
Investment Income and Expenditure line of the Comprehensive Income and Expenditure Statement – this is
calculated by applying the discount rate used to measure the defined benefit obligation at the beginning of the
period to the net defined liability at the beginning of the period – taking into account any changes in the net defined
benefit liability during the period as a result of contribution and benefit payments. 
Remeasurements comprising: 
• The return on plan assets - excluding amounts included in net interest on the net defined benefit liability – charged
to the Pension Reserve as Other Comprehensive Income and Expenditure 
• Actuarial gains and losses – changes in the net pensions liability that arise because events have not coincided with
assumptions made at the last actuarial valuation or because the actuaries have updated their assumptions –
charged to the Pensions Reserve as Other Comprehensive Income and Expenditure
• Contributions paid to the Strathclyde Pension Fund – cash paid as employer’s contributions to the pension fund
settlement of liabilities; not accounted for as an expense.

Page 45

Page 43
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
In relation to retirement benefits, statutory provisions require the General Fund Balance to be charged with the amount
payable by the Council to the pension fund or directly to pensioners in the year, not the amount calculated according to
the relevant accounting standards. In the Movement in Reserves Statement, this means there are transfers to and from
the Pensions Reserve to remove the notional debits and credits for retirement benefits and replace them with debits for
the cash paid to the pension fund and pensioners and any such amounts payable but unpaid at the year-end. A negative
balance that may arise on the Pensions Reserve thereby measures the beneficial impact to the General Fund of being
required to account for retirement benefits on the basis of cash flows rather than as benefits are earned by employees. 
1.11.4 Pension Net-Asset Recognition 
Where the Council’s share of the Local Government Pension Scheme is an overall asset position, reflecting that its
share of the Funds’ assets exceeds the present value of its liabilities to members, this is accounted for in line with the
requirements of IAS 19 and IFRIC 14. Specifically, the asset recognised by the Council is limited to the extent to which
the Council can recover the benefit of the asset through refunds or reduced contributions. This is referred to as an “asset
ceiling”. More information is provided in note 22 to the accounts 
1.11.5 Discretionary Benefits
The Council has restricted powers to make discretionary awards of retirement benefits in the event of early retirements.
Any liabilities estimated to arise as a result of an award to any member of staff (including teachers) arising from the use
of these discretionary powers are accrued in the year of the decision to make the award and accounted for using the
same policies as are applied to the local government pension scheme. 
1.12 Events after the Reporting Period
Events after the reporting period are those events (both favourable and unfavourable) that occur between the end of
the reporting period and the date the Financial Statements are authorised for issue. Two types have been identified: 
• those that provide evidence of conditions that existed at the end of the reporting period – the Financial Statements
are adjusted to reflect this
• those indicative of conditions that arose after the reporting period – the Financial Statements are not adjusted to
reflect this however, if material, a disclosure is made within the notes of the nature and financial effect. 
1.13 Exceptional Items
When items of income and expenditure are material, their nature and amount is disclosed separately, either within the
Comprehensive Income and Expenditure Statement or in the notes to the accounts, depending on how significant the
items are to the understanding of the Council’s financial performance. 
1.14 Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when the Council becomes party to the contractual provisions
of a financial instrument and initially measured at fair value and carried at their amortised cost. Annual charges to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement for
interest payable are based upon the carrying amount of the liability, multiplied by the effective rate of interest for the
instrument. The effective interest rate is the rate that exactly discounts estimated future cash payments over the life of
the instrument to the amount at which it was originally recognised. 
For most of the borrowing that the Council has this means that the amount presented in the Balance Sheet is the
outstanding principal repayable (plus accrued interest). Interest charged to the Comprehensive Income and Expenditure
Statement is the amount payable for the year according to the loan agreement. 
1.15 Financial Assets
Financial assets are classified using a classification and measurement approach that reflects the business model for
holding the financial assets and their cash flow characteristics.

Page 46

Page 44
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
There are three main classes of financial assets measured at:
• amortised cost
• fair value through other comprehensive income
• fair value through profit or loss 
The Council’s business model is to hold investments to collect contractual cash flows. Financial assets are all therefore
classified as amortised cost. In previous years these assets, although still recorded as amortised costs, were classed
as loans and receivables. 
1.15.1 Financial Assets Measured at Amortised Cost
Financial assets measured at amortised cost are recognised on the Balance Sheet when the authority becomes party
to the contractual provisions of a financial instrument and are initially measured at fair value. They are subsequently
measured at their amortised cost. Annual credits to the Financing and (Investment) Income and Expenditure line in the
CIES for interest receivable are based on the carrying amount of the asset multiplied by the effective rate of interest for
the instrument. For all financial assets held by the Council, this means that the amount presented in the Balance Sheet
is the outstanding principal receivable (plus accrued interest) and interest credited to the CIES is the amount receivable
for the year in the loan agreement.
1.15.2 Expected Credit Loss Model
The Council recognises expected credit losses on its financial assets held at amortised cost, either on a 12-month or
lifetime basis.  The expected credit loss model also applies to lesser receivables and contract assets.  Only lifetime
losses are recognised for trade receivables (debtors) held by the council.  Where assets are identified as impaired
because of a likelihood arising from a past event that payments due under the contract will not be made, the asset is
written down and a charge made to the Financing and Investment (Income) and Expenditure line in the CIES. Impairment
loss is measured as the difference between the carrying amount and the present value of the revised future cash flows
discounted at the asset’s original effective interest rate. 
1.15.3 Financial Assets measured at Fair Value through profit or Loss
Financial assets measured at fair value through profit or loss are recognised on the Balance Sheet when the Council
becomes a party to the contractual provisions of a financial instrument and are initially measured and carried at fair
value. Fair value gains and losses are recognised as they arrive in the Surplus or Deficit on the Provision of Services.
The fair value measurements of the financial assets are based on the following techniques:
• Instruments with quoted market prices – the market price
• Other instruments with fixed and determinable payments – discounted cash flow analysis 
Inputs to the measurement techniques are categorised in accordance with the following three levels:
• Level 1 inputs– quoted prices (unadjusted) in active markets for identical assets or liabilities that the authority can
access at the measurement date.
• Level 2 inputs – inputs other than quoted prices included within Level 1 that are observable for the asset or liability,
either directly or indirectly.
• Level 3 inputs – unobservable inputs for the asset or liability. 
Any gains and losses that arise on the derecognition of the asset are credited or debited to the Financing and Investment
Income and Expenditure line in the Comprehensive Income and Expenditure Statement. 
1.16 Government Grants and Contributions
Government grants and other contributions are recognised as due when there is reasonable assurance that: 
• the Council will comply with the conditions attached to the payments
• the grants or contributions will be received.

Page 47

Page 45
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Amounts recognised as due to the Council are not credited to the Comprehensive Income and Expenditure Account
until conditions attached to the grant or contribution have been satisfied. Conditions are stipulations that specify that the
future economic benefits or service potential embodied in the asset acquired using the grant or contribution are required
to be consumed by the recipient as specified for future economic benefit or service potential must be returned to the
transferor. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance
Sheet as creditors. When conditions are satisfied, the grant or contribution is credited to the relevant service line
(attributable revenue grants/contributions) or Taxation and Non-Specific Grant Income (non-ringfenced revenue grants
and all capital grants) in the Comprehensive Income and Expenditure Statement. 
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are reversed out of
the General Fund balance in the Movement in Reserves Statement. Where the grant has not yet been used to finance
capital expenditure, it is posted to the Capital Grants Unapplied Account. Where it has been applied, it is posted to the
Capital Adjustment Account. Amounts in the Capital Grants Unapplied Account are transferred to the Capital Adjustment
Account once they have been applied. 
1.17 Inventories
Inventories are held by several Council services, such as asset maintenance services, roads, services, school technician
services, hospitality services, etc., and include consumable stock and work in progress, where appropriate. 
Consumable stock is included in the Balance Sheet on a cost price basis, with inventory quantities based on physical
stock at the end of the year. 
1.18 Leases
1.18.1 Council as Lessee
The Council classifies contracts as leases based on their substance. Contracts and parts of contracts, including those
described as contracts for services, are analysed to determine whether they convey the right to control the use of an
identified asset, through rights both to obtain substantially all the economic benefits or service potential from that asset
and to direct its use. The Code expands the scope of IFRS 16 Leases to include arrangements with nil consideration,
peppercorn or nominal payments. 
1.18.2 Council as Lessor
Finance Leases
When the Council grants a finance lease over an asset, the asset is written out of the Balance Sheet as a disposal. At
the start of the lease the carrying amount of the asset is written off to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement as part of the gain/loss on disposal. A gain, representing the
Council’s net investment in the lease is credited to the same line in the Comprehensive Income and Expenditure
Statement, matched by a lease asset in the Balance Sheet. Lease rentals receivable are apportioned between: 
• a receipt for the acquisition of the interest in the asset – applied to write down the lease asset (together with any
premiums received)
• finance income (credited to the Financing and Investment income and Expenditure line in Comprehensive Income
and Expenditure Statement). 
The gain credited to the Comprehensive Income and Expenditure Statement on disposal is not permitted by statute to
increase the General Fund balance and will be required to be treated as a capital receipt. Where a premium has been
received, this is posted out of the General Fund Balance to the Capital Receipts Reserve in the Movement in Reserves
Statement. Where the amounts due in relation to the lease asset is to be settled by the payment of rentals in future
financial years, this is posted out of the General Fund Balance to the Deferred Capital Receipts Reserve in the
Movement in Reserves Statement. When the future rentals are paid, the element of the charge for the acquisition of the
interest in the asset is used to write down the lease asset. At this point, the deferred capital receipts are transferred to
the Capital Receipts Reserve.

Page 48

Page 46
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
The written off value of the disposals is not a charge against council tax, as the cost of non-current assets is fully
provided for under separate arrangements for capital financing. Amounts are appropriated to the Capital Adjustment
Account from the General Fund balance in the Movement in Reserves Statement. 
Operating Leases
Where the Council grants an operating lease over an asset, the asset is retained in the Balance Sheet. Rental income
is credited to the Other Operating Expenditure line in the Comprehensive Income and Expenditure Statement. Credits
are made on a straight line basis over the life of the lease, even if it doesn’t match the pattern of payment. 
1.19 Overhead and Support Services
The costs of overheads and support services are charged to non-General Fund services that benefit from the supply in
accordance with the costing principles of the CIPFA Service Reporting Code of Practice 2024/25. The total absorption
costing principle is used – the full cost of overheads and support services are shared between those users in proportion
to the benefits received. General Fund Services have not been charged for these support service costs, in line with the
Council’s budgetary reporting structure. 
1.20 Public Private Partnership (PPP) and Similar Contracts
PPP and similar contracts are agreements to receive services, where the responsibility for making available the property,
plant and equipment needed to provide the services passes to the private contractor. As the Council is deemed to
control the services that are provided under the PPP scheme and as ownership of the property, plant and equipment
will pass to the council at the end of the contract for no additional charge, the Council carries the asset on its Balance
Sheet. 
Service Concession Arrangement Flexibility Application 
The Scottish Government’s 2022 Resource Spending Review contained details of a Service Concession Arrangement
(SCA) flexibility that related to the Council’s PPP schools.  The flexibility permits councils to undertake internal
accounting changes that extend the period over which the principal repayment of the unitary charge can be made which
results in a one-off credit to the General Fund and ongoing annual savings for a period of time. In the remaining years
following the end of the SCAs, the rescheduled debt repayments continue until the debt liability has been extinguished.
The Statutory Regulation in relation to this matter, Local Government Finance Circular 10/2022 (FC 10/2022), was
published in September 2022. 
FC 10/2022 replaces the 2010 version that covered this area and permits the authority to apply a temporary flexibility
for service concession arrangements entered prior to April 2022. The Circular sets out the accounting requirements and
the options permitted for the recognition of repayments of the principal element of the lease component or the lease
liability for the year and the temporary flexibility for SCAs entered prior to 1 April 2022. 
The Council has applied the permitted change in the calculation of the statutory charge and the adopted approach has
been applied across all arrangements held by the Council in line with the key accounting principle of consistency. 
The annual unitary charge will continue to be paid to the contractor over the contract period. The guidance applies to
principal and not to interest, service charge costs or grant. These will continue to be accounted for over the contract
period. 
Annuity method for revised repayment of debt liability 
The recalculation of the debt liability charges applies the annuity method to calculate the revised repayments. This
method best represents the consumption of the assets over their useful lives. 
This methodology is applied within the Councils current Loans Fund repayment policy. The use of an annuity method
for the writing down of the PPP debt liability therefore ensures a consistent approach for the writing down of all debt
which is financing capital expenditure, in that.

Page 49

Page 47
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
• The annuity method provides a fairer charge than equal instalments as it takes account of the time value of money,
whereby paying £100 in 10 years’ time is less of a burden than paying £100 now. 
• The schedule of charges produced by the annuity method thus results in a consistent charge over an asset’s life,
considering the real value of the amounts when they fall due. 
• The annuity method is a prudent basis for providing for assets that provided a steady flow of benefits over their
useful life.’ 
Useful Economic Life 
The most appropriate asset life for the calculation is considered to be 60 years which replicates the useful asset life of
other similar type assets held on the Council’s balance sheet i.e. schools. The Council’s Loans Fund methodology use
a Useful Economic Life (UEL) of 60 years when calculating the repayment of debt liability for borrowing to support capital
expenditure for similar types of assets. The proposed application a UEL of 60 years for the two SCAs arrangements is
therefore considered consistent with current council methodology. 
Capital Financing Requirement 
The reprofiling of the debt liability repayments over the life of the asset rather than the life of the contract increases the
Capital Financing Requirement (CFR) as at 1 April 2022. The increase in the CFR will continue to be reduced by the
revised repayments after each SCA contract has expired until the end of the revised period. 
Accounting Treatment 
The statutory adjustment can be made as at 1 April in the year the revised repayments are applied. This option was
exercised in 2022/23 and has been applied retrospectively. Being a cumulative statutory adjustment there is no prior
year restatement of statutory adjustments in the Annual Accounts. The statutory adjustment results in a debit to the
Capital Adjustment account with a corresponding credit in the Movement in Reserves Statement within the General
Fund. Until the end of the contract period for each of the five SCAs. Thereafter the revised charges will result in higher
cost being charged to the General fund that the current repayment profile until the end of the UEL 
1.21 Provisions
Provisions are made where an event has taken place that gives the Council a legal obligation or constructive obligation
that probably requires settlement by a transfer of economic benefits or service potential and a reliable estimate can be
made of the amount of that obligation. 
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income and Expenditure
Statement in the year the Council becomes aware of the obligation and measured at the best estimate at the Balance
Sheet date, taking account of relevant risks and uncertainties. 
When payments are made they are charged to the provision carried in the Balance Sheet. Estimated settlements are
reviewed at the end of each financial year. Where it becomes less probable that a transfer of economic benefits is
required; the provision is reversed and credited back to the relevant service. 
1.22 Interest in Companies and Other Entities
The Council has material interests in companies and other entities that have the nature of associates/ subsidiaries and
require it to prepare group accounts. In the Council’s own single entity accounts, the interests of two companies are
recorded as an investment in the Balance Sheet, as the Council has shares and full ownership of the Clydebank Property
Company (purchased during 2014/15) and has an investment with Hub West Scotland (invested 2015/16). No other
interests are recorded in the Council’s single entity accounts of any of other organisation. 
1.23 VAT
VAT payable is included as an expense only to the extent that it is not recoverable from HM Revenue and Customs.
VAT receivable is excluded from income.
1.24 Loans Advances Repayment
In accordance with The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016, the Council has
recalculated the repayments of the loans fund advances to reflect the life of the specific assets associated with the debt.

Page 50

Page 48
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Repayments are made using either the annuity method (at 9%) or the straight-line method over the useful economic life
of the assets. 
From 2021/22 onwards, the Council applies the straight-line method in respect of relevant loans fund advances, in line
with its Treasury Management Strategy. 
Note 2 – Critical Judgement in Applying Accounting Policies
The preparation of the consolidated financial statements requires management to make some judgements and
assumptions when applying the accounting policies that have the most significant effect on carrying amounts in the
financial statements. These judgements are usually about complex transaction or involve uncertainty about future
events. Where a critical judgement has been made, this is referred to in the relevant note to the core financial statements;
however, a summary of those with the most significant effect are detailed below: 
Public Private Partnership (PPP) and Design-Build-Finance-Maintain (DBFM) - The Council has entered into a
PPP contract for the provision of three secondary schools and one primary school. The Council has also entered into a
DBFM contract for one secondary school. The contracts include the build of the schools as well as their maintenance
and provision of related facilities over the period of each contract. After consideration of International Financial Reporting
Interpretations Committee IFRIC12 (Service Concession Arrangements), it has been concluded that these are service
concession arrangements and the Council controls the services provided under the scheme and ownership of the
schools will pass to the Council at the end of the contracts for no additional charge. The Authority continues to measure
its PPP/PFI service concession liabilities using the fixed interest rate implicit in each contract, in line with IFRS 16 where
the implicit rate can be reliably identified. The financial models agreed at financial close include a contractually fixed
financing rate that remains unchanged throughout the life of each arrangement.  There has been no change to contract
terms, financing structures, or relevant accounting standards, and therefore the Authority has concluded that the existing
approach remains appropriate. As a result, no change has been made to the prior‑year disclosure.  The assets used to
provide services at the schools are recognised on the Council’s Balance Sheet as operational assets and as a finance
lease liability. The value of these assets (£98.765m) is included within the Property, Plant and Equipment (Note 14) and
the liability within Note 15 - Private Finance Initiatives and similar Contracts (£87.449m). 
Council Acting as Principal or Agent - When the Council receives funding it requires to consider the degree of control
it has over how this funding is to be utilised. If the Council has no discretion over the utilisation of the funds it deems
that it is acting as an agent and this funding is reported in the Agency Services note and not reflected in the Council’s
income and expenditure, but with any amounts owed to/ from the Council held within its Balance Sheet. 
Provision or Contingent Liability - Where the Council faces a future liability and this can be quantified with a
reasonable degree of certainty, a provision for that liability is made. If the liability cannot be quantified, it will be disclosed
as a Contingent Liability (Note 30). Most of these involve ongoing or prospective legal action meaning the outcome and
potential amounts involved cannot be determined with any level of accuracy.
Note 3 – Assumptions Made About the Future and Other Major Sources of
Estimation Uncertainty
The Financial Statements contain estimated figures that are based on assumptions about the future or that are otherwise
uncertain. Estimates are made taking into account historical experience, current trends and other relevant factors.
However, because balances cannot be determined with certainty, actual results could be materially different from the
assumptions and estimates. The items in the Council’s balance sheet as at 31 March 2026, for which there is a significant
risk of material adjustment in the forthcoming financial year are noted below:

Page 51

Page 49
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Item Uncertainties Effect if Actual results Differ from Assumptions
Property Plant
and
Equipment –
valuation
The Council’s assets are valued on a
rolling programme over a maximum of 5
years. The valuation assumptions are
ascertained by the professional valuers
used by the Council. 
If the actual results differ from the assumptions, the
value of the assets could be affected.
The value of the assets subject to revaluation over
the rolling programme is £993.279m. 
During 2025/26 the assets that were revalued are
now held in the Balance Sheet to a total value of
£560.513m.  The impact for each 1% change in
these valuations would be £5.605m within the
Balance Sheet, resulting in an increase or a
decrease to the Revaluation Reserve, or an
impairment charge, but with no effect on the
General Fund or the HRA reserves.
Indexation was carried out for DRC and EUV assets
not revalued within the year totalling £7.368m. 
The impact for each 1% change in these indexation
rates would be £4.674m within the Balance Sheet,
resulting in an increase or a decrease to the
Revaluation Reserve, but with no effect on the
General Fund or the HRA reserves.
Any change would also impact on annual
depreciation charges in future years.
Property Plant
and
Equipment –
depreciation /
useful lives
Assets are depreciated over useful lives
that are dependent on assumptions about
the level of repairs and maintenance that
will incur in relation to those assets. The
current economic climate makes it
uncertain that the Council will be able to
sustain its current level of spending on
maintenance, bringing into doubt the
useful lives assigned to assets.
If the useful life of an asset is reduced, depreciation
increases and the carrying amount of the asset
falls.  For example, it is estimated that for a building
valued at £20 million with a useful economic life of
60 years, the annual depreciation charge would
increase by £5,650 if the useful economic life had to
be reduced by one year. 
Pension
Liability/Asset
Estimation of the net asset/liability to pay
pensions depends on a number of
complex judgements relating to the
discount rates used, the rate at which
salaries are projected to increase by,
changes to retirement ages, mortality
rates and expected returns on pension
assets held. This is further detailed within
Note 22 to the Financial Statements. A
firm of consulting actuaries is engaged to
provide the Council with expert advice
about the assumptions applied.
The effect on the net asset/liability can be
measured. For example, a decrease in the discount
rate of 0.1% would decrease the pension asset held
on the Balance sheet by 2% or £11.734m; and
increase in the pension rate by 0.1% would
decrease the pension asset held on the Balance
sheet by 1% or £10.928m.  The interaction of
assumptions is extremely complex.  See note 22 for
further assumptions. 
Note 4 Accounting Standards that have been issued but have not yet been
adopted
For 2025/26, the Code requires the disclosure of information relating to the expected impact of an accounting change
that will be required by a new standard that has been issued but not yet adopted. This applies to the adoption of the
following new or amended standards within the 2025-26 Code: 
• Amendments to FRS 102 The Financial Reporting Standard applicable in the UK and Republic of Ireland
(Amendments to Heritage assets) issued in March 2024

Page 52

Page 50
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
• Amendments to the Classification and Measurement of Financial Instruments (Amendments to IFRS 9 and IFRS
7) issued in May 2024
• Annual improvements to IFRS accounting standards – Volume 11 issued in July 2024
• Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) issued in December
2024.
These amendments are not expected to have a material impact on the authority’s accounting policies or the amounts
recognised in the financial statements for 2025/26. 
Note 5 Expenditure and Funding Analysis
The Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources (Government
Grants, Council Tax and Non-Domestic Rates) by local authorities in comparison with those resources consumed or
earned by authorities in accordance with generally accepted accounting practices. It also shows how expenditure is
allocated for decision making purposes between the Council’s services. Income and expenditure accounted for under
generally accepted accounting practices is presented more fully in the Comprehensive Income & Expenditure
Statement.
Expenditure and Funding Analysis 2025-26
2025/26
Expenditure
chargeable to the
General Fund and
HRA Balance
Adjustments
between
Funding and
Accounting
Basis
Net Expenditure in
the Comprehensive
Income and
Expenditure
Statement
£'000 £'000 £'000
Resources 4,839 1,635 6,474
Regulatory and Regeneration 4,917 5,353 10,270
People & Technology 10,166 2,154 12,320
Citizens, Culture and Facilities 19,334 2,460 21,794
Education, Learning and Attainment 128,258 7,972 136,230
Roads and Neighbourhood 18,235 7,987 26,222
Housing and Employability (214) 955 741
Miscellaneous Services (3,570) (1,616) (5,186)
Health and Social Care Partnership 94,152 4,514 98,666
Requisitions 2,477 0 2,477
Housing Revenue Account (31,628) 37,490 5,862
Net Cost of Service 246,966 68,904 315,870
(Gain)/Loss on disposal of non-current assets 0 8,229 8,229
Financing and Investment (Income) and Expenditure (Note x) 25,302 15,988 41,290
Taxation and Non-specific Grant Income (Note x) (311,391) (39,536) (350,927)
(Surplus) or Deficit on the Provision of Services (39,123) 53,585 14,462
Opening General Fund and HRA Balance at 1 April 2023 (12,883)
Surplus/(Deficit) on HRA in the year (511)
Surplus/(Deficit) on General Fund in the year (6,423)
Surplus/(Deficit) on General Fund and HRA in the year (6,229)
Closing General Fund balance at 31 March 2024 (26,046)

Page 53

Page 51
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Adjustments between General Fund and Comprehensive Income and Expenditure Statement
2025-26
Adjustment
for Capital
Purposes
Net change to
Pension
Adjustment
Other
differences
Total
Adjustments
£'000 £'000 £'000 £'000
Resources 1,280 355 0 1,635
Regulatory and Regeneration 4,967 386 0 5,353
People & Technology 1,677 477 0 2,154
Citizens, Culture and Facilities 1,615 845 0 2,460
Education, Learning and Attainment 5,999 1,687 286 7,972
Roads and Neighbourhood 6,948 1,039 0 7,987
Housing and Employability 0 955 0 955
Miscellaneous Services 55 (1,605) (66) (1,616)
Health and Social Care Partnership 1,550 2,964 0 4,514
Requisitions 0 0 0 0
Housing Revenue Account 36,952 545 (7) 37,490
Net Cost of Services 61,043 7,648 213 68,904
Other operating expenditure 8,229 0 0 8,229
Financing and Investment (Income) and Expenditure (41,686) 2,370 (220) (39,536)
Taxation and Non-specific Grant Income 15,988 0 0 15,988
Difference between general Fund (Surplus)/Deficit and Comprehensive
Income & Expenditure Statemet (Surplus)/Deficit on the Provision of
Service
43,574 10,018 (7) 53,585
Comparative figures for 2024-25
Expenditure and Funding Analysis 2024-25
Expenditure chargeable to the
General Fund and HRA Balance
Adjustments between Funding
and Accounting Basis
Net Expenditure in the
Comprehensive Income and
Expenditure Statement
£'000 £'000 £'000
Resources 3,967 1,742 5,709
Regulatory and Regeneration 3,837 5,295 9,132
People & Technology 10,007 2,517 12,524
Citizens, Culture and Facilities 13,841 1,911 15,752
Education, Learning and Attainment 127,581 7,997 135,578
Roads and Neighbourhood 18,052 8,163 26,215
Housing and Employability 3,289 1,988 5,277
Miscellaneous Services (3,852) (1,828) (5,680)
Health and Social Care Partnership 89,859 5,951 95,810
Requisitions 2,406 0 2,406
Housing Revenue Account (26,662) 15,603 (11,059)
Net Cost of Service 242,325 49,339 291,664
(Gain)/Loss on disposal of non-current assets 0 2,100 2,100
Financing and Investment (Income) and Expenditure (Note 8) 32,685 11,567 44,252
Taxation and Non-specific Grant Income (Note 9) (293,265) (18,902) (312,167)
(Surplus) or Deficit on the Provision of Services (18,255) 44,104 25,849
Opening General Fund and HRA Balance at 1 April 2024 (16,342)
Surplus/(Deficit) on HRA in the year 359
Surplus/(Deficit) on General Fund  in the year 4,517
transfer (to)/from other Statutory Reserves (1,417)
Closing General Fund and HRA balance at 31 March 2025 (12,883)

Page 54

Page 52
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Adjustments between General Fund and Comprehensive Income and Expenditure Statement
2024-25
Adjustment for
Capital Purposes
Net change to
Pension
Adjustment
Other
differences
Total
Adjustments
£'000 £'000 £'000 £'000
Resources 1,216 526 0 1,742
Regulatory and Regeneration 4,750 545 0 5,295
People & Technology 1,722 795 0 2,517
Citizens, Culture and Facilities 596 1,315 0 1,911
Education, Learning and Attainment 5,032 2,745 220 7,997
Roads and Neighbourhood 6,662 1,500 0 8,163
Housing and Employability 0 1,988 0 1,988
Miscellaneous Services 55 (1,955) 72 (1,828)
Health and Social Care Partnership 1,375 4,576 0 5,951
Requisitions 0 0 0 0
Housing Revenue Account 14,862 744 (3) 15,603
Net Cost of Services 36,271 12,779 289 49,339
Other operating expenditure 2,100 0 0 2,100
Taxation and Non-specific Grant income (21,249) 2,377 (30) (18,902)
Financing and Investment (Income) and Expenditure 11,567 0 0 11,567
Difference between General Fund and HRA (Surplus)/Deficit and
Comprehensive Income & Expenditure Statemet (Surplus)/Deficit on the
Provision of Service
28,689 15,156 259 44,104
Adjustments for Capital Purposes
This column adds in depreciation, impairment and revaluation gains and losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal of assets and the
amounts written off for those assets. 
• Financing and investment income and expenditure – the statutory charges for capital financing and other revenue
contributions are deducted from other income and expenditure as these are not chargeable under generally
accepted accounting practices. 
• Taxation and non-specific grant income and expenditure – capital grants are adjusted for income not chargeable
under generally accepted accounting practices. Revenue grants are adjusted from those receivable in the year to
those receivable without conditions or for which conditions were satisfied throughout the year. The Taxation and
Non-Specific Grant Income and Expenditure line is created with capital grants receivable in the year without
conditions or for which conditions were satisfied in the year. 
Net Change for the Pension Adjustments 
Net change for the removal of pension contributions and the addition of IAS19 Employee Benefits pension related
expenditure and income:
• For services, this represents the removal of the employers contributions made by the Council as allowed by statute
and the replacement with current service costs and past service costs. 
• For financing and investment income and expenditure, the net interest on the defined benefit liability is charged to
the Comprehensive Income and Expenditure Statement. 
Other Differences 
Other differences between amounts debited or credited to the Comprehensive Income and Expenditure Statement and
amounts payable or receivable to be recognised under statute: 
• For services an adjustment is made for the accrual of holiday pay and other similar entitlements, this is required
under generally accepted accounting principles but the impact on the General Fund and the HRA is mitigated by
statute which allows the impact to be reversed out through the Movement in Reserves.
• For Financing and investment income and expenditure, the ‘other differences’ column recognises adjustments to
the General Fund for the timing differences for premiums and discounts. 
Expenditure and Income Analysed by Nature
Where items are not disclosed on the face of the Comprehensive Income and Expenditure Statement, the code requires
a disclosure of the nature and amount of material items. An analysis of material items of income and expenditure by
nature is shown below:

Page 55

Page 53
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
2024-25 2025-26
£'000 £'000
Expenditure
242,313 Employee Benefits Expenses 242,468
262,025 Other Service Expenses 401,666
36,274 Depreciation, Amortisation, Impairment (61,043)
44,262 Interest payments 41,290
2,406 Precepts and levies 2,477
2,100 (Gain) or Loss on Disposal of Assets 8,229
589,380 Total Expenditure 635,087
Income
(250,008) Fees, charges and Other Service Income (271,021)
(41,701) Income from Council Tax (45,949)
(87,481) income from Non-domestic rates (84,737)
(1,356) Interest and Investment Income (1,024)
(182,985) Government grants and Contributions (217,894)
(563,531) Total Income (620,625)
25,849 (Surplus)/Deficit  on the Provision of Service 14,462

Page 56

Page 54
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 6 Adjustments between Accounting Basis and Funding Basis under Regulations
This note provides further breakdown of the adjustments summarised in the Movement in Reserves Statement on page 33. It is identified under the headings
Usable and Unusable Reserves. Further detail of the reserves identified under the classification of usable and unusable is given in notes 7 and 24 respectively.
2025-26
General
Fund
Balance
HRA
Balance
Capital
Grants
and
Receipts
Unapplied
Account
Capital
Fund
Total
Usable
Reserves
Capital 
Adjustment
Account
Revaluation
Reserve
Pension
Reserve
Employee
Statutory
Adjustment
Account FIAA
Total
Unusable
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Charges for depreciation and impairment of non-current
assets (23,918) (36,913) 0 0 (60,831) 60,831 0 0 0 0 60,831
Amortisation of intangible assets (174) (38) 0 0 (212) 212 0 0 0 0 212
Capital Grants and Contributions applied 31,756 9,930 0 (5,948) 35,738 (35,738) 0 0 0 0 (35,738)
Capital expenditure charged in year to revenue balances 255 1,992 0 0 2,247 (2,247) 0 0 0 0 (2,247)
Disposal of Fixed Assets (8,229) 0 (278) 0 (8,507) 8,507 0 0 0 0 8,507
Statutory Repayment of Debt 2,158 11,441 0 0 13,599 (13,062) 0 0 0 (537) (13,599)
Adjustment to the statutory repayment of debt for service
concession arrangements - permitted flexability 355 0 0 0 355 (355) 0 0 0 0 (355)
Write off Revaluation Reserve Balance (disposals) 0 0 0 0 0 (399) 399 0 0 0 0
Amounts by which finance costs charged to the CIEs are
different from finance costs chargeable in the year in
accordance with statutory requirements 116 104 0 0 220 0 0 0 0 (220) (220)
Reversal of items relating to retirement benefits debited or
credited to the CIES (Note 22) (17,766) (1,059) 0 0 (18,825) 0 0 18,825 0 0 18,825
Employers' pension contributions payable in the year 8,292 515 0 0 8,807 0 0 (8,807) 0 0 (8,807)
Amount by which employees’ remuneration charged to the
CIES on an accrual basis is different from remuneration
chargeable in the year in accordance with statutory
requirements (220) 7 0 0 (213) 0 0 0 213 0 213
Total Statutory Adjustments (7,375) (14,021) (278) (5,948) (27,622) 17,749 399 10,018 213 (757) 27,622

Page 57

Page 55
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Comparative information 2024/25
2024-25
General Fund
Balance HRA Balance
Capital Grants
and Receipts
Unapplied
Account Capital Fund
Total Usable
Reserves
Capital 
Adjustment
Account
Revaluatio
n Reserve
Pension
Reserve
Employee
Statutory
Adjustment
Account FIAA
Total Unusable
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Charges for depreciation and impairment of non-current assets (21,286) (14,835) 0 0 (36,121) 36,121 0 0 0 0 36,121
Amortisation of intangible assets (127) (26) 0 0 (153) 153 0 0 0 0 153
Capital Grants and Contributions applied 13,335 7,914 0 0 21,249 (21,249) 0 0 0 0 (21,249)
Capital expenditure charged in year to revenue balances (51) 0 0 0 (51) 51 0 0 0 0 51
Disposal of Fixed Assets (2,100) 0 (1,252) 0 (3,352) 3,352 0 0 0 0 3,352
Capital expenditure charged to revenue (CFCR) 0 0 0 0 0 0 0 0 0 0 0
Statutory Repayment of Debt - Loans Fund Advances 5,114 9,764 0 0 14,878 (14,310) 0 0 0 (568) (14,878)
Statutory Repayment of Debt - PPP Finance - service
concession adjusment (3,590) 0 0 0 (3,590) 3,590 0 0 0 0 3,590
Adjustment to the statutory repayment of debt for service
concession arrangements - permitted flexability 330 0 0 0 330 (330) 0 0 0 0 (330)
Write off Revaluation Reserve Balance (disposals) 0 0 0 0 0 (1,960) 1,960 0 0 0
0
Amounts by which finance costs charged to the CIEs are
different from finance costs chargeable in the year in
accordance with statutory requirements
28 2 0 0 30 0 0 0 0 (30)
(30)
Reversal of items relating to retirement benefits debited or
credited to the CIES (Note 22) (22,723) (1,180) 0 0 (23,903) 0 0 23,903 0 0 23,903
Employers' pension contributions payable in the year 8,311 436 0 0 8,747 0 0 (8,747) 0 0 (8,747)
Amount by which employees’ remuneration charged to the
CIES on an accrual basis is different from remuneration
chargeable in the year in accordance with statutory
requirements
(292) 3 0 0 (289)
0 0 0 289 0 289
Total Statutory Adjustments (23,050) 2,078 (1,252) 0 (22,225) 5,418 1,960 15,156 289 (598) 22,225

Page 58

Page 56
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 7 Earmarked Reserves
Reserves are created by appropriating amounts from the General Fund balance in the Movement in Reserves
Statement. When expenditure to be financed from a reserve is incurred, it is charged to the appropriate service within
the CIES. The reserve is then appropriated back into the General Fund balance in the Movement in Reserves Statement
(MiRS) so that there is no net charge against Council Tax for the expenditure. The Council has several usable reserve
funds. The Capital Fund is used to meet the costs of capital investment in assets and for the repayment of the principal
element of borrowings. 
Movements in the Council’s usable reserves are detailed in the Movement in Reserves Statement (MiRS).  The major
part of the General Fund balance shown in the MiRS has been earmarked and effectively committed to fund specific
projects in future years. The amounts set aside for earmarked reserves are shown in the following table: 
Balance at
1 April 2024
Transfers Out
2024/25
Transfers In
2024/25
Balance at
31 March
2025
Transfers Out
2025/26
Transfers In
2025/26
Balance at 31
March 2026
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Earmarked reserves: General Fund
Change Training budget 1 (1) 0 0 0 0 0
HR/Legal Commitments 210 (15) 0 195 (15) 0 180
Miscellaneous Employability Reserves 126 0 51 177 (71) 1,263 1,369
Miscellaneous Housing & Communities Reserves 553 (54) 21 520 0 150 670
Miscellaneous CCF Reserves 25 (25) 0 0 0 0 0
Miscellaneous Resources Reserves 37 (77) 493 453 (480) 174 147
Miscellaneous Economic Development & Regulatory Reserves 40 (48) 105 97 (217) 698 578
Miscellaneous Roads & Neighbourhood Services 0 0 0 0 0 675 675
Miscellaneous Education Reserves 884 (725) 178 337 (337) 0 0
Miscellaneous People & Technology 0 (26) 35 9 0 0 9
Early Retiral/Voluntary Severence Reserve 3,350 (3,077) 320 593 (1,131) 1,192 654
Cost of Living 1,498 (634) 0 864 (351) 0 513
Smoothing Fund for 2 year Service Transformation Project 2,391 (1,170) 0 1,221 (576) 0 645
SPFO in year reduction in employer pension contributions 0 (5,332) 9,687 4,355 0 4,701 9,056
DABVJB - Scottish Parliamentary Elections 0 0 0 0 0 0 0
Future Pay Awards 0 0 0 0 0 0 0
Prudential Target Future Years 0 0 0 0 0 0 0
Budget Funding reserve 0 0 0 0 0 912 912
Total: Earmarked Reserves - General Fund 9,115 (11,184) 10,890 8,821 (3,178) 9,765 15,408
Earmarked Reserves: Housing Revenue Account
Service Improvements 0 0 0 0 0 0 0
Welfare Reform resilience Reserve 0 0 0 0 0 0 0
non-earmarked balance - HRA 969 (358) 0 611 0 511 1,122
Total: Earmarked Reserves - Housing Revenue Account 969 (358) 0 611 0 511 1,122
Capital Grants and receipts unapplied 213 (1,465) 1,252 0 0 0 0
Other Reserves 194 0 48 242 (3) 0 239
Non-earmarked balance 6,258 (3,361) 555 3,452 (1,175) 7,240 9,517
TOTAL RESERVES 16,749 (16,368) 12,745 13,126 (4,356) 17,516 26,286
Note 8 Financing and Investment (Income) and Expenditure
2024-25 2025-26
£'000 £'000
Interest payable and similar charges:
8,148 Schools' Public Private Partnership finance lease 8,051
33,737 Other Interest Payable and Similar Charges 34,197
(1,356) Interest and Investment Income (1,024)
1,346 Impairment Loss- Debtors 2,005
0 (Gain)/Loss early settlement of borrowing (4,309)
2,377 Net Pension Interest Expense 2,370
44,252 Total 41,290

Page 59

Page 57
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 9 Taxation and Non-Specific Grant Income
2024-25 2025-26
£'000 £'000
(41,701) Council Tax (45,949)
(87,481) Non-Domestic Rates (84,737)
(161,736) Revenue Support Grant (176,208)
0 Central Government Funding (2,347)
(21,249) Recognised Capital grants and contributions (41,686)
(312,167) Total (350,927) 
Note 10 Grant Income
Government grants and third-party contributions and donations are recognised as due to the Council when there is
reasonable assurance that:
• The Council will comply with the conditions attached to the payments, and 
• The grants or contributions will be received. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance
Sheet as creditors. Where conditions are satisfied, the grant or contribution is credited to the relevant service line
(attributable revenue grants) or Taxation and Non-specific Grant Income (non-ring-fenced revenue grants and all capital
grants). Where capital grants are credited to the CIES, they are reversed out of the General Fund balance in the
Movement in Reserves Statement. 
The Council credited the following grants and other contributions to Taxation and Non-specific Grant Income within the
Comprehensive Income and Expenditure Statement in 2025/26: 
2024-25 Grant Income 2025-26
£'000 £'000
Credited to Taxation and Non Specific Grant Income
249,217 Revenue Support Grant 260,945
5,187 General Capital Grant 19,026
7,914 New House Build 9,930
6,486 Levelling Up Fund 4,860
1,051             Exxon City Deal 7,137
258 Clyde Mission Grant 0
149 Transport Scotland 112
0 Place Based Investments 100
0 Inspiring School Age Childcare Spaces Fund 205
206 Other Grants 316
270,468          Total 302,631

Page 60

Page 58
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
The Council credited the following grants to Services within the Comprehensive Income and Expenditure Statement in
2025/26:
2024/25 Grant Income 2025/26
£'000 £'000
Credited  to Services
29,115 Housing Benefit Subsidy 22,570
442 Housing Benefit Subsidy Admin Charge 463
10,975 NHS Resource Transfer 11,414
100 Net Zero heating 0
414 Early Learning 0
3,150 Pupil Equity Fund 2,596
2,055 Criminal Justice 2,714
1,105 Scottish Attainment 863
2,133 Unitary Charge for DBFM 2,134
2,811 UK Shared Prosperity 952
1,161 Asylum Seekers 811
801 Child Poverty 830
0 Ukraine Project 828
324 Private Sector Housing 426
0 Home Energy Efficiency Programme 383
396 Care Experienced Children and young People 358
0 Resettlement Scheme 296
241 School Milk and Healthy Snacks 277
305 Mental Wellbeing 0
236 Education Maintenance Allowance 250
0 EPR Funding 2,347
121 Violence against women 207
0 Fairer Future Partnership 188
0 Specialist Employability Support 126
0 Calendonian 122
239 Covid 19 Vaccination centre recovery funds 0
111 Community Intervention 0
116 Cash First Fund 0
539 No-one Left Behind 606
540 Grants under £0.100m 252
57,430 Total 52,013
Capital Grant Receipts in Advance
The Council has received a number of grants that have yet to be recognised as income as they have conditions attached
to them that will require the monies or property to be returned to the giver.  The balances at the yearend are as follows:
31 March 2025 31 March 2026
4,953 Levelling Up Funding 1,873
0 Support for Cladding Remediation 1,121
0 Pride In Place Impact Fund 750
406 Place Based Investment 675
1,414 Clyde Mission 648
0 Glencairn Digital Project 187
757 Clydebank Canal Investment 0
205 Inspiring School Age Childcare Spaces Fund 0
107 Queen Mary Avenue  0
486 Grants under £0.100m 151
8,328 5,405

Page 61

Page 59
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 11 Property, Plant and Equipment
11.1 Movement in Property, Plant & Equipment 2025-26
Council
dwellings
Other Land
& buildings
Industrial
Units
Vehicles
& Plant Community
Surplus
Assets
Assets Under
Construction 2025-26 Infrastructure*
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost/Valuation at 1 April 2025 648,988 494,584 40,623 40,084 12,916 6,169 110,297 1,353,661 184,986
Additions 36,401 5,600 0 6,182 942 0 42,784 91,909 5,301
Disposals (23) (23,436) (465) (28,002) 0 (58) 0 (51,984) (10,313)
Revaluation adjustments to Revaluation Reserve (41,373) 5,105 1,019 0 0 0 0 (35,249) 0
Revaluation adjustments to CIES (158,089) (2,469) 0 0 0 0 0 (160,558) 0
Assets reclassified to/from Assets under Construction 51,096 1,218 0 35 0 0 (53,448) (1,099) 1,099
Adjustments - assets at nil NBV 0 0 0 0 0 0 0 0 0
Other reclassification of assets 0 (388) 0 15,241 0 (4,591) 0 10,262 0
As at 31 March 2026 537,000 480,214 41,177 33,540 13,858 1,520 99,633 1,206,942 181,073
Depreciation/Impairment at 1 April 2025 (121,737) (36,444) (1,278) (21,064) (5,063) (25) 0 (185,611) (75,753)
Depreciation charge (15,280) (7,783) (385) (3,852) (907) 0 0 (28,207) (8,721)
Depreciation on Disposals 23 16,348 57 27,882 0 0 0 44,310 9,867
Depreciation written out to the Revaluation Reserve 136,960 1,674 0 0 0 0 0 138,634 0
Revaluation written out to the CIES 0 0 0 0 0 0 0 0 0
Impairment losses/(reversal) to the Revaluation Reserve 0 0 0 0 0 0 0 0 0
Impairment losses/(reversal) to the CIES 0 0 0 0 0 0 0 0 0
Other movements in depreciation and impairment 34 52 0 (15,241) 0 25 0 (15,130) 0
As At 31 March 2026 0 (26,153) (1,606) (12,275) (5,970) 0 0 (46,004) (74,607)
Net Book Value at 31 March 2025 527,251 458,140 39,345 19,020 7,853 6,144 110,297 1,168,050 109,233
Net Book Value at 31 March 2026 537,000 454,061 39,571 21,265 7,888 1,520 99,633 1,160,938 106,466
*As permitted by Finance Circular 06-2025 the council has adopted both Statutory Override 1 & 2 relating to infrastructure assets which allow for the following; 
Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2027 a local authority is not required to report the gross cost and accumulated depreciation for
infrastructure assets. 
Statutory Override 2: For accounting periods commencing 1 April 2010 until 31 March 2027 the carrying amount to be derecognised in respect of a replaced part of an infrastructure asset is to
be taken and accounted for as a nil amount. No subsequent adjustment shall be made to the carrying amount of the asset with respect to that part.

Page 62

Page 60
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
11.2 Movement in Property, Plant 7 Equipment 2024-25
Council
dwellings
Other
Land &
buildings
Industrial
Units
Vehicles
& Plant Community
Surplus
Assets
Assets Under
Construction Total 2024-25 Infrastructure*
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost/Valuation at 1 April 2024 611,283 476,353 40,890 38,259 11,019 5,751 54,774 1,238,329 180,280
Additions 37,705 7,209 0 4,430 850 0 64,804 114,998 4,410
Disposals 0 (1,188) (262) (2,605) 0 (124) 0 (4,179) 0
Revaluation adjustments to Revaluation Reserve 0 6,925 0 0 0 0 0 6,925 0
Revaluation adjustments to CIES 0 (1,781) 0 0 0 0 0 (1,781) 0
Assets reclassified  to/from Assets under Construction 0 7,860 0 0 1,047 0 (9,281) (374) 296
Other reclassification of assets 0 (793) (5) 0 0 542 0 (256) 0
As at 31 March 2025 648,988 494,585 40,623 40,084 12,916 6,169 110,297 1,353,662 184,986
Depreciation/Impairment at 1 April 2024 (107,409) (32,067) (895) (19,798) (4,241) 0 0 (164,410) (67,288)
Depreciation charge (14,328) (7,749) (387) (3,871) (822) 0 0 (27,157) (8,464)
Depreciation on Disposals 0 68 4 2,605 0 0 0 2,677 0
Depreciation written out to the Revaluation Reserve 0 1,685 0 0 0 0 0 1,685 0
Revaluation written out to the CIES 0 1,647 0 0 0 0 0 1,647 0
Impairment losses/(reversal) to the Revaluation Reserve 0 (21) 0 0 0 0 0 (21) 0
Impairment losses/(reversal) to the CIES 0 (36) 0 0 0 0 0 (36) 0
Other movements in depreciation and impairment 0 30 0 0 0 (25) 0 5 0
As At 31 March 2025 (121,737) (36,443) (1,278) (21,064) (5,063) (25) 0 (185,610) (75,752)
Net Book Value at 31 March 2024 503,874 444,286 39,995 18,461 6,778 5,751 54,774 1,073,919 112,992
Net Book Value at 31 March 2025 527,251 458,142 39,345 19,020 7,853 6,144 110,297 1,168,052 109,233
1,073,919*As permitted by Finance Circular 09-2022 the council has adopted both Statutory Override 1 & 2 relating to infrastructure assets which allow for the following; 
Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2026 a local authority is not required to report the gross cost and accumulated depreciation for
infrastructure assets. 
Statutory Override 2: For accounting periods commencing 1 April 2010 until 31 March 2026 the carrying amount to be derecognised in respect of a replaced part of an infrastructure asset is to
be taken and accounted for as a nil amount. No subsequent adjustment shall be made to the carrying amount of the asset with respect to that part.

Page 63

Page 61
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
11.3 Commitments under Capital Contracts
At 31 March 2026, the Council had commitments on capital contracts for the construction or enhancement of property,
plant and equipment for non-housing projects of £32.712m and housing projects of £29.492m. This expenditure will be
funded from a combination of Government Grants, borrowing and income from selling assets and contributions from
Revenue Accounts. Similar commitments at 31 March 2025 were £40.302m and £17.860m respectively. The major
commitments are: 
General Services £'000
Exxon Road - Construction of new relief road 27,441
Artizan Centre Redevelopment 3,874
Gruggies Burn 1,000
Alexander Street Improvements 397
HRA £'000
West Thomson Street 14,163
Willox Park Phase 2 5,247
Bonhill Gap Site 4,168
Bank Street 3,843
Queen Mary Avenue 2,071
11.4 Summary of Capital Expenditure and Financing
Capital expenditure involves the creation of assets, the benefit of which will be available to future rates and Council
taxpayers. It is financed from borrowing, capital receipts and capital grants. The cost of the asset is effectively borne
over a period of years. In 2025/26 total spending on capital projects was £97.269m.
2024-25 2025-26
£'000 £'000
787,648 Opening Capital Financing Requirement 877,634
Capital Investment
119,408 Property, Plant and Equipment 97,211
2,436 Right of Use Assets 0
390 Intangibles 58
0 Heritage Assets 0
122,234 Total Capital Investment 97,269
Sources of Finance
3,260 Sevice Concession - statutory adjustment 3,991
(21,249) Government Grants and other Contributions (35,738)
51 Revenue Contributions (2,247)
(14,310) Loan Fund Principal Repayments (17,408)
(32,248) Total Capital Financing (51,402)
877,634 Closing Capital Financing Requirement 923,501
Movements in the year
86,726 Increase in Underlying Need to Borrow 41,876
3,260 Service Concession Arrangements 3,991
89,986 Movement in Capital Financing Requirement 45,867

Page 64

Page 62
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 12 Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the Council as a result
of past events (e.g. computer software and/or software licences) is capitalised when it is expected that future economic
or service benefits will flow from the asset to the Council. 
The Council accounts for its software as intangible assets, to the extent that the software is not an integral part of a
particular IT system and accounted for as part of the hardware item of property, plant and equipment. The intangible
assets include purchased licences. 
Where appropriate, the carrying amount of intangible assets is amortised on a straight-line basis. The amortisation of
£0.162m charged to revenue in 2025/26 was charged to Information Services. The charge to Information Services is
then absorbed as an overhead across all the service headings in the Net Cost of services. It is not possible to quantify
exactly how much of the amortisation is attributable to each service heading. 
The movement in intangible assets during the year was:
2024/25 2025/26
£'000 £'000
Balance at 1 April
1,574 Gross carrying amount 2,041
(632) Accumulated amortisation (785)
942 Net carrying amount at start of year 1,256
390 Acquisitions in year 58
77 Transfer from assets under Construction 0
(153) Amortisation for period (211)
1,256 Net carrying amount at 31 March 1,103
Comprising:
2,041 Gross Carrying amounts 1,756
(785) Accumulated amortisation (653)
1,256 1,103
Note 13 Heritage Assets
Heritage assets are both tangible and intangible assets with historic, artistic, scientific, technological, geographical or
environmental qualities, which are held and maintained primarily for their contribution to knowledge and culture. The
authority holds heritage assets of six main types: 
• Models of Ships,
• Works of Art,
• Silver and Commemorative Ware,
• Civic Regalia (Robes and Chains),
• Sewing Machine Collections,
• Listed Buildings and Scheduled Ancient Monuments. 
The valuation of these assets held on the balance sheet as detailed below:
2024/25 2025/26
£'000 £'000
1,524 Balance at 1 April 1,524
0 Additions/ Disposals / Newly Classified 0
1,524 Balance at 31 March 1,524

Page 65

Page 63
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
The models of ships, works of art, silver and commemorative ware, civic regalia and sewing machine collections are the
responsibility of the Libraries and Museums Service and accounts for approximately 90% of the overall collection with
the remaining 10% being recorded and accessioned into the collection on a regular basis in line with museum
accreditation. These works are held at the following locations: 
• Collections Store, Poplar Road
• Collections Store, Stanford Street
• Clydebank Town Hall. 
Models of Ships - include MV Rangitane, MV Essex and HMS Vanguard. 
Works of Art - there are 474 paintings within the works of art collection. 
Civic Regalia - predominately relates to the collection of provost robes and chains of office. It would be relatively rare
for the authority to purchase, or dispose of, items of civic regalia. 
Sewing Machine Collection - there are 813 sewing machines (of various models) included within the sewing machine
collection. 
Listed Buildings and Scheduled Ancient Monuments - the Council holds and maintains listed buildings and ancient
monuments of historic significance, many of which are tributes to the war dead. As well as memorial structures and
buildings, the Council maintains statues and fountains. 
Note 14 Assets Held for Sale
Assets held for sale are those where the carrying amount will be recovered principally through a sale transaction
rather than through continued use. Before an asset can be classified as held for sale, the following conditions must be
met: 
• the asset must be available for immediate sale in its present condition,
• the sale must be highly probable and an active programme to locate a buyer and complete the plan must have
been initiated,
• the asset must be actively marketed for sale at a price that is reasonable in relation to its current fair value,
• the sale should be expected to qualify for recognition as a completed sale within one year of the date of
classification. 
When these criteria are met, assets within the category of Property, Plant & Equipment will be reclassified to “Non-
Current Assets Held for Sale”. 
2024/25 2025/26
£'000 £'000
2,743 Balance at 1 April 1,042
0 Acquisitions 0
256 Assets newly classified as held for sale 4,948
0 Property, Plant and Equipment - Impairment 0
(106) Revaluation Losses (169)
(1,851) Disposals (489)
0 Assets declassified as held for sale 0
1,042 As at 31 March 5,332

Page 66

Page 64
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 15 Private Finance Initiatives and Similar Contracts 
Schools PPP Scheme and Long Term Liability (Design, Build, Finance and Maintain (DBFM) Scheme)
2025/26 was the seventeenth year of a thirty-year public private partnership for provision of three secondary schools
and one primary school in Clydebank and Alexandria. 2025/26 was the ninth year of a twenty-five year DBFM
partnership for the provision of one secondary school in Dumbarton. 
The Council has rights to use the schools for core educational purposes between agreed hours. The contract specifies
minimum standards for the services to be provided by the contractor, with deductions from the fee payable being made
if facilities are unavailable or performance is below the minimum standards. 
The partnership agreement was for the design, build, finance and operation of the schools which means that the
contractor took on the obligation to construct the schools and maintain them in a minimum acceptable condition and to
procure and maintain the plant and equipment needed to operate the schools. When the agreement ends, after thirty
years, unrestricted use and operation of the buildings will be handed back to the Council at nil cost. 
The Termination rights are in line with the market norms reflected in the Scottish Standard Schools Contract, as
approved by the Scottish Government, prior to financial close. 
15.1 Assets held under Schools PPP and DBFM Contracts
The construction costs of the five school buildings, adjusted for revaluations/indexation, additions and depreciation are
included as part of Operational Land and Buildings.
2024/25 2025/26
£'000 £'000
Cost or Valuation
136,063 At 1 April 138,991
Revaluations
2,928 To Revaluation Reserve 3,503
0 To CIES (729)
0 Additions 0
138,991 At 31 March 141,765
Accumulated Depreciation and Impairment
(74) At 1 April (1,665)
(1,591) Depreciation Charge (1,628)
Depreciation written out
0 To revaluation reserve 0
0 To Net Cost of Service 0
(1,665) At 31 March (3,293)
135,989 Opening Net Book value 137,326
137,326 Closing Net Book value 138,472 
15.2 Payments
The amounts payable to the PPP and DBFM operators each year is analysed into five elements:
• fair value of the services received during the year
• finance cost – an interest charge on the outstanding Balance Sheet liability
• contingent rent – increases in the amount to be paid for the property arising during contract
• payment towards the liability – applied to write down the Balance Sheet liability towards the PPP contractor
• lifecycle replacement costs – proportion of the amounts payable posted to the Balance Sheet as a prepayment and
then recognised as additions to property, plant and equipment when the relevant work is carried out.

Page 67

Page 65
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Payments remaining to be made under the PPP and DBFM contracts at 31 March 2026 (excluding any estimation of
inflation and availability/performance deductions) are as follows: 
Repayment of
Liability
Future
Payments for
Service (inc
lifecycle
maintenance) Finance Costs
Total Unitary
Payment
£'000 £'000 £'000 £'000
less than 1 year 4,740 6,370 5,740 16,850
2-5 years 16,839 32,603 19,908 69,350
6-10 years 28,651 45,510 17,119 91,280
11-15 years 26,113 35,969 5,157 67,239
16-20 years 2,165 2,043 199 4,407
PPP Contractual Liability
as at 31 March 2026
78,508 122,495 48,123 249,126
Although the payments made to the contractor are described as unitary charge payments, they have been calculated to
compensate the contractor for the fair value of the services they provide, the capital expenditure incurred and interest
payable whilst the capital expenditure remains to be reimbursed. The liability outstanding to be paid to the contractor
for capital expenditure incurred is as follows: 
2024/25 2025/26
£'000 £'000
86,443 Opening Balance as at 1 April 82,853
(3,590) Repayments (4,346)
82,853
School finance Lease Liability
as at 31 March 78,507
Split:
4,346 Obligation payable within 1 year 4,740
78,508 Obligation payable after 1 year 73,768
82,854
School finance Lease Liability
as at 31 March 78,507
Note 16 Leases
16.1 Right of Use Assets Lease Liability - Council as Lessee
Leases which have substantially transferred to the authority the benefits and risks of ownership of a non-current asset,
are treated as if the asset had been purchased outright. Assets acquired under leases are included in non-current assets
at the lower of the fair value or the present value of the minimum lease payments. The capital element of the lease is
included as obligations under finance leases / creditors. The lease rentals comprise capital and interest elements. The
capital element is applied to reduce the outstanding obligation and the interest element is charged to revenue on a
straight-line basis over the terms of the lease.
Although certain leases specify a contractual interest rate, management determined that the interest rate implicit in the
leases could not be readily determined in practice, primarily due to the use of lessor-specific assumptions. Accordingly,
a weighted average incremental borrowing rate of 4.33% was applied to measure the lease liabilities as at 1 April 2024.
For any leases which required remeasurement in 2025/26 with an updated weighted average incremental borrowing
rate the rate used was 4.09%.
Under IFRS 16, the Council recognises right-of-use assets and lease liabilities for most leases. 
The Council has applied recognition exemptions to short-term leases and has not recognised right-of-use assets and
lease liabilities for short term leases that have a term of 12 months or less. The Council recognises the lease payments
associated with these leases as an expense on a straight-line basis over the lease term.

Page 68

Page 66
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
2024/25 Right of Use Assets 2025/26
£'000 Other Land and Buildings £'000
Cost or Valuation
0 At 1 April 2,436
2,436 Additions 0
0 Remeasurement of leases 120
2,436 At 31 March 2,556
Accumulated Depreciation and Impairment
0 At 1 April (308)
(308) Depreciation Charge (312)
(308) At 31 March (620)
0 Opening Net Book Value 2,128
2,128 Closing Net Book Value 1,936
31 March 2025 Right of Use Assets 31 March 2026
£'000 Lease Liabilities £'000
252                       within one year 223
817                       Between 2 and 5 years 834
1,110                     Over 5 years 969
2,179                     2,026
Split:
252                       Current 223
1,927                     Non-Current 1,803
2,179                     Total Liabilities 2,026
Amount charged to the Council Comprehensive Income and Expenditure amounted to £0.092m in 2025/26 (2024/25:
£0.100m) related to interest expense on the lease liabilities.
16.2 Operating Leases – Council as Lessee
The Council has adopted IFRS 16 from 1 April 2024.  Properties and other vehicles, plant and equipment that fall under
the scope of IFRS 16 have now been reclassified as right of use assets on the balance sheet (per 16.1).  the disclosures
below relates to assets that were of low value when new and leases that have less than 12 months to run. 
31 March 2025 31 March 2026
£'000 £'000
367 Not later than one year 263
52 Later than one year and not later than five years 93
10 Later than five years 10
429 366
The expenditure charged to the appropriate service lines in the Comprehensive Income and Expenditure Statement
during the year in relation to these leases was £0.454m (2024/25 £0.440m). 
16.3 Operating Leases – Council as Lessor
Where the Council grants an operating lease over a property, the asset is retained in the Balance Sheet classed as an
operational asset in Note 11.
Rental income received under operating leases is credited to the relevant service in accordance with the terms specified
in the lease agreement.
The Council leases out property under operating leases for the following purposes:
• For the provision of community services, such as sports facilities, tourism services and community centres.
• For economic development purposes to provide suitable affordable accommodation for local businesses.

Page 69

Page 67
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Material Lease 
The future minimum lease payment due under this lease is as follows:
31 March 2025 31 March 2026
£'000 £'000
1,214 Not later than one year 1,214
4,855 Later than one year and not later than five years 4,855
89,421 Later than five years 88,207
95,490 94,276
The minimum lease payments receivable do not include rents that are contingent on events taking place after the lease
was entered into, such as adjustments following rent reviews. 
Other Leases
The authority also holds approximately 157 other operating leases, primarily short-term or low-value arrangements for
commercial and industrial use. These leases are collectively immaterial and the aggregate future lease receipts from
these immaterial leases represent less than 5% of the authority’s total annual income and contributing less than
0.27% of total income for the year.   Therefore, they have not been disclosed in detail 
Lessor Risk Management
When acting as a lessor, the Authority retains certain rights in the underlying leased assets. The Authority manages
the risks associated with these retained rights through its asset management and leasing framework. Lease
agreements typically include conditions relating to asset use, maintenance and return, and may incorporate
mechanisms such as variable lease payments, residual value protections or buy‑back arrangements to reduce
exposure to residual value or usage‑related risks. The Authority also undertakes periodic monitoring of leased assets
to ensure compliance with lease terms and to safeguard the value of the underlying assets.
Note 17 Debtors
£'000 £'000 £'000 £'000
8,277 Central Government Bodies 2,020
4,254 Scottish Government (including NHS bodies) 9,209
856 Other Local Authorities 2,116
8 Other Entities and Individuals 0
66,177 Local taxation receivable 72,888
(38,980) Impairment allowance for doubtful debt (42,067)
27,197 Local Taxation (net of impairment) 30,821
31,804     Trade Debtors 39,898
(5,150) Impairment allowance for doubtful debt (7,199)
26,654 Trade Debtors (net of impairment) 32,699
67,246 Total Debtors 76,865
31 March 2025 31 March 2026
Note 18 Cash and Cash equivalents 
31 March 2025 Movement 31 March 2026
£'000 £'000 £'000
Net Bank Current Account* (5,721) 4,554 (1,167)
Short term deposits with UK banks 13,949 14,635 28,584
Net Cash and Cash equivalents 8,228 19,189 27,417
*A further breakdown of the bank account balances is noted below:

Page 70

Page 68
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
31 March 2025 31 March 2026
£'000 £'000
903 Bank current Accounts in balance 759
(6,624) Current Accounts in overdraft (1,926)
(5,721) (1,167)
Note 19 Creditors
31 March 2025 31 March 2026
£'000 £'000
6,026             Central government bodies 7,407             
20,969           Other local authorities 25,140           
1,681             Scottish Government including NHS Bodies 2,144             
Trade Creditors
33,621           Other Entities and individuals 28,042           
62,297           62,733            
Note 20 Provisions
VS/ER Legal
Litigations Other Total
£'000 £'000 £'000 £'000
Opening Provision as at 1 April 2024 1,971 650 16 2,637
Contributions in year 0 0 0 0
Amounts utilised in year (1,651) 0 (16) (1,667)
Unutilised amounts reversed in year (320) 0 0 (320)
Closing Provision as at 31 March 2025 0 650 0 650
Contributions in year 0 450 0 450
Amounts utilised in year 0 (482) 0 (482)
Unutilised amounts reversed in year 0 0 0 0
Closing Provision as at 31 March 2026 0 618 0 618
Legal Litigation costs £0.618m This provision is for future legal costs as the Council is involved in an ongoing case that
will incur costs in future years. The provision is based on anticipated future costs.
Other Provisions: Intromission liability for historic abuse claims following reorganisation of Strathclyde regional Council
amounts agreed and paid from West Dunbartonshire Council to Glasgow City Council.
Compensation Payments – Voluntary Severance/Early Retirement (VS/ER) cost:  This balance of the provision was
released unutilised in 2024/25 and added to the ear-marked reserve for future voluntary severance/voluntary
redundancy costs as a reliable estimate could not be established. 
Note 21 Financial Instruments
Categories of financial Instrument
Long Term Current Long Term Current
£'000 £'000 £'000 £'000
Debtors
2,021           42,786         Financial assets at amortised cost 2,614 69,160
Borrowing
467,240       334,350       Financial liabilities at amortised cost 521,476 348,607
Other long term liabilities
78,508         4,346           PPP and finance leases 73,768 4,740
1,927           252              ROU Asset Liability 1,803 223
Creditors
0 62,297         Financial liabilities at contract amount 0 62,733
31 March 202631 March 2025
Accounting regulations require the “financial instruments” (investment, lending and borrowing of the Council) shown on
the Balance Sheet to be further analysed into various defined categories. The investments, lending and borrowing
disclosed in the Balance Sheet are made up of the following categories of “financial instruments”:

Page 71

Page 69
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Fair Value of Assets and Liabilities carried at Amortised Cost
Financial assets (represented by lending and receivables) and financial liabilities (represented by borrowings) and are
carried in the Balance Sheet at amortised cost. Fair values have been calculated with reference to the following: 
Financial Liabilities 
• PWLB Loans (Level 2) - For loans from the PWLB, premature repayment rates from the PWLB in force on 31 March
2026 have been applied to provide the fair value under PWLB debt redemption procedures. As the Debt
Management Office provides a transparent approach allowing the exit cost to be calculated without undertaking a
repayment or transfer it is appropriate to disclose the exit price. As an alternative, we have assessed the cost of
taking a new loan at PWLB new loan rates applicable to existing loans on Balance Sheet date (which could be
viewed as a proxy for transfer value). 
• Non-PWLB loans (Level 2) - For non-PWLB loans payable, prevailing market rates for new borrowing have been
applied to provide the fair value. In the absence of a substantial active market for new long term market loans, the
rates used for new borrowing are based on discussions with possible market participants for new lending. These
rates provide a reasonable proxy for rates that market participants appear to have used for early redemption costs
for market loans.  
• PFI/Finance leases (Level 2) – Fair value has been calculated at level 2 on a simple proxy basis. The same NPV
methodology has been applied as for PWLB and non-PWLB debt. 
Financial Assets 
• Fixed or variable short-term deposits of less than a year (including MMF's) – Where an instrument has a maturity
of less than 12 months or is a trade or other receivable the fair value is taken to be the carrying amount or the billed
amount. 
Policy Type Assets 
• Long term debtors – Level 2. 
Debtors 
• The fair value of trade and other receivables is taken to be the invoiced or billed amount. 
Transfers between Levels of the Fair Value Hierarchy 
• There were no transfers between input levels 1 and 2 or transfers in or out of level 3 during the year. 
Changes in the Valuation Technique 
• There has been no change in the valuation technique used during the year for the financial instruments. 
Fair values of financial assets and financial liabilities are calculated as follows:
Carrying
Amount
Fair
Value
Carrying
Amount
Fair
Value
£'000 £'000 £'000 £'000
Debtors
42,786 42,786 Financial Assets at Amortised Cost1 69,160 69,160
Cash and Cash Equivalents
8,227     8,227     Cash and Cash Equivalents 27,417 27,417
Creditors
62,297 62,297 Financial liabilities at contract amount1 62,733 62,733
Borrowing
801,590 677,918 Financial liabilities2 870,083 784,500
Other Long Term Liabilities
82,853 82,853 PPP and Finance Lease Liabilities2 78,508 78,508
2,179 2,179 ROU Asset Liability 2,026 2,026
31 March 2025 31 March 2026
1 The fair value is equal to the carrying amount because all financial assets at amortised cost are either short term or at a fixed interest
rate or a variable rate linked to base rate without significant transaction costs. The Council does not hold any equity investments in
an unquoted market and, therefore, this type of investment is excluded from the above table. 
2 The fair value is lower than the carrying amount because the Council’s portfolio of loans includes a number of fixed rate loans where
the interest rate payable is lower than the rates available for similar loans at the balance sheet date. The commitment to pay interest

Page 72

Page 70
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
above current market rates increases the amount that the Council would have to pay if the lender requested or agreed to early
repayment of the loans. 
A further breakdown of types of borrowing held by the Council as at 31 March 2026 is noted below: 
Principal
outstanding
Accrued interest /
EIR adjustment
Carrying
amount
Principal
outstanding
Accrued interest /
EIR adjustment
Carrying
amount
£'000 £'000 £'000 £'000 £'000 £'000
62,059 5,357 67,416 PWLB 90,428 6,371 96,799
0 683 683 Mortgage loans 0 300 300
259,300 5,695 264,995 Local Authority 245,500 4,732 250,232
1,256 0 1,256 Other 1,276 0 1,276
322,615 11,735 334,350 Short Term Loans 337,204 11,403 348,607
390,432 0 390,432 PWLB 482,991 0 482,991
65,400 1,256 66,656 Mortgage loans 32,300 1,036 33,336
10,000 0 10,000 Local Authority 5,000 0 5,000
152 0 152 Other 149 0 149
465,984 1,256 467,240 Long Term Loans 520,440 1,036 521,476
31 March 2025 31 March 2026
Gains and Losses on Financial Instruments
The gains and losses recognised in the Comprehensive Income and Expenditure Account in relation to financial
instruments are made up as follows:
Financial Assets:
Loans &
receivables
Financial
Liabilities:
amortised
cost
Total
Financial Assets:
Loans &
receivables
Financial
Liabilities:
amortised
cost
Total
£'000 £'000 £'000 £'000 £'000 £'000
1,356 0 1,356 Interest (investment) 1,024 0 1,024
Interest payable and similar
charges
0 (41,920) (41,920) Interest/expense* 0 (42,248) (42,248)
0 0 0
(Gain)/Loss on early settlement
of borrowing 0 4,309 4,309
0 5 5 (Gain)/Loss on de-recognition 0 220 220
1,356 (41,915) (40,559) Net (Gain)/loss in year 1,024 (37,719) (36,695)
31 March 2025 31 March 2026
* Interest/Expense has been calculated on an EIR basis where appropriate for market instruments.
There has been no gain/loss on either of the following classes of financial instruments, as the Council does not own
them:
• available for sale financial assets
• financial assets or liabilities at a fair value through profit and loss.
Nature and Extent of Risks arising from Financial Instruments
The Council activities expose it to a variety of financial risks:
• Credit risk – the possibility that other parties might fail to pay amounts due to the Council.
• Liquidity risk – the possibility the Council might not have funds available to meet its commitments to make payments 
• Market risk – the possibility that financial loss might arise for the Council as a result of changes in such measures
as interest rates and stock market movements. 
The Council’s management of treasury risks actively works to minimise the Council’s exposure to the unpredictability of
financial markets and implementing restrictions to minimise these risks. The procedures for risk management are set

Page 73

Page 71
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
out through a legal framework in the Local Government (Scotland) Act 2003 and the associated regulations. During
2025/26 these required the Council to comply with the CIPFA Prudential Code, the CIPFA Treasury Management in the
Public Services 
Code of Practice and the Local Government Investments (Scotland) Regulations 2010. Overall these procedures require
the Council to manage risk in the following ways:  
(i) by formally adopting the requirements of the Code of Practice
(ii) by the adoption of a Treasury Policy Statement and treasury management clauses within its financial
regulations/standing orders
(iii) by approving annually in advance prudential and treasury indicators for the following three years in limiting the
Council’s:
• overall borrowing.
• maximum and minimum exposures to fixed and variable rates.
• maximum and minimum exposures regarding the maturity structure of debt
• maximum annual exposure to investments maturing beyond a year.
(iv) by approving an investment strategy for the forthcoming year setting out its criteria for both investing and selecting
investment. 
These are required to be reported and approved prior to the start of the year to which they relate.  These items are
reported with the annual treasury management strategy which outlines the detailed approach to managing risk in relation
to the Council’s financial instrument exposure. Actual performance is reported to Members to assess the effectiveness
of controls established. 
The 2026/27 annual Treasury Management Strategy which incorporates the prudential indicators was approved by
Council on 25 March 2026 and audit committee on 10 June 2026 is available on the Council website. The key issues
within the strategy were:
• the authorised limit for 2026/27 was set by Council at that meeting at £1,189.688m.  This is the maximum limit of
external borrowing
• the operational boundary was expected to be £1,026.399m. This is the expected level of debt during the year
• the maximum amounts of fixed and variable interest rate exposure were set at 100% and 50% based on the
Council’s gross debt
• the maximum exposures to the maturity structure of debt is detailed with refinancing and maturity risk. 
The Council has fully adopted all required CIPFA Codes and statutory regulation currently in force, and maintains written
principles for overall risk management, as well as written policies and procedures covering specific areas such as credit
risk, liquidity risk, refinancing/maturity risk and market risk. 
Management of Credit Risk
Credit risk arises from the short-term lending of surplus funds to banks, building societies and other local authorities as
well as credit exposures to the Council’s customers. It is the policy of the Council to place deposits only with a limited
number of pre-approved UK banks and building societies whose credit rating is independently assessed as sufficiently
secure and low risk by the Council’s treasury advisers and to restrict lending to a prudent maximum amount for each
institution. 
The Council’s maximum exposure to credit risk in relation to investments in banks and building societies of £28.584m
cannot be assessed on a general basis as the risk of any institution failing to make interest payments or repay principal
sums is specific to each individual institution, however, recent experience has shown that the institutions invested in at
the year-end are unlikely to default on their commitments. A risk of recoverability applies to all of the Council’s deposits
but there was no evidence at 31 March 2026 that this was likely to happen. 
The following analysis summarises the Council’s maximum exposure to credit risk on other financial assets, based on
past experience and current market conditions.

Page 74

Page 72
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Amount at 31
March 2025
Amount at 31
March 2026
Historical experience of non-
payment adjusted for market
conditions at 31 March 2025
Estimated maximum
exposure to default and
uncollectibility
£'000 £'000 % £'000
46,154 Customers and other income 73,779 10.76 2,005 
The Council does not hold any of the following in relation to financial assets:
• collateral as security in case of default of investment
• financial assets that would otherwise be past due or impaired but have been renegotiated. 
The Council does not generally allow credit for customers, however currently £20.365m is past its due date for
payment (2024/25: £15.846m). The past due amount can be analysed by age as follows: 
31 March 2025 31 March 2026
£'000 £'000
3,883 Less than three months 3,403
1,067 Three to six months 985
1,844 Six months to one year 3,882
9,052 More than one year 12,095
15,846 Total 20,365
In general, provisions are made in accordance with Code Guidance, whereby a judgement is made regarding the
probability of collection for each category of debt. This judgement is based upon the past experience of collecting each
category of debt to calculate the appropriate percentage of each debt that may not be eventually recovered. It should
be noted that due to the limitations on the available age analysis of rent arrears, the bad debt provision of this debt is
based on the total value of the debt by tenant, and not by age past due.
No financial assets have been individually determined to be impaired and no collateral is held on past due or impaired
financial assets, therefore the Council has not obtained financial or non-financial assets during the financial year by
taking possession of any collateral or calling on other credit enhancements. 
Management of Liquidity risk 
The Council manages its liquidity position through the risk management procedures noted above (i.e. the setting and
approval of prudential indicators and the approval of the treasury and investment strategy reports), as well as through
a comprehensive cash flow forecast management system, as required by the CIPFA Code of Practice. This seeks to
ensure that cash is available when it is needed. 
The Council has ready access to borrowing from the Money Markets to cover any day-to-day cash flow need if required.
The Council is required to provide a balanced budget through the Local Government Finance Act 1992, which ensures
that sufficient funds are raised to cover annual expenditure. There is, therefore, no significant risk that the Council will
be unable to raise finance to meet its commitments under financial instruments. 
Refinancing and Maturity Risk 
The Council maintains a significant debt portfolio and whilst the cash flow procedures above are considered against the
refinancing risk procedures, longer term risk to the council relates to managing the exposure to replacing financial
instruments as they mature. This risk relates to the maturing of longer-term financial liabilities. 
The approved treasury indicator limits for the maturity structure of debt are the key parameters used to address this risk
and the central treasury team address the operational risks within the approved parameters. This includes:
• monitoring the maturity profile of financial liabilities and amending the profile as appropriate through either new
borrowing or the rescheduling of the existing debt
• monitoring the maturity profile of investments to ensure that sufficient liquidity is available for the Council’s day-to-
day cash flow needs.

Page 75

Page 73
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
The maturity analysis of financial liabilities is as follows:
Creditors PPP ROU Borrowing Total
£'000 £'000 £'000 £'000 £'000
Less than one year 62,733 4,740 223 348,607 416,303
Between one and two years 8,489 233 203,071 211,793
Between two and five years 18,270 601 194,282 213,153
More than five years 47,009 969 124,122 172,100
62,733 78,508 2,026 870,082 1,013,349 
Management of Market risk
Changes in market interest rates influence the interest payable on borrowings and on interest receivable on surplus
funds invested. For example, a rise in interest rates would mean an increase in the interest charges on borrowing at
variable rates and an increased cost to the taxpayer. An increase in interest rates would also mean an increase in the
income received on lending at variable rates and a reduction in cost for the taxpayer. 
Changes in market rates also affect the notional “fair value” of lending and borrowing. For example, a rise in interest
rates would reduce the fair value of both lending and borrowing at fixed rates. Changes in the fair value of lending and
borrowing do not impact upon the taxpayer and are confined to prescribed presentational aspects in the Accounts. 
The Council has a variety of strategies for managing the uncertainty of future interest rates and the financial impact on
the Council: 
• it is the policy of the Council to limit its exposure to variable rate borrowing to a maximum of 50% of what it borrows
• during periods of falling rates and where it is economically advantageous to do so, the Council will consider the
repayment and restructuring of fixed interest rate debt
• the Council takes advice from its specialist treasury advisers and actively monitors changes in interest rates to
inform decisions on the lending of surplus funds, new borrowings and restructurings of existing borrowings
• any potential for a financial impact on the Council is also significantly limited by the Scottish Government’s grant
distribution mechanism that automatically adjusts for changes in interest rates in the government grant support
the Council receives for “loan charges”. 
The interest rate profile of the Council’s borrowing is as follows:
£'000 % £'000 %
803,770 99.2       Fixed Interest Debt 870,083 99.8      
6,625 0.8        Variable Interest Debt 1,926 0.2       
810,395 872,009
2024/25 2025/26
To illustrate the impact of changes in interest rates upon the Council, the following table shows the financial effect if
rates had been 1% higher at 31 March 2026, with all other variables held constant: 
Impact on tax payers and rent payers £'000
Increase on interest payable on variable debt borrowings 1
Increase in interest receivable on variable rate investments 0
Impact on Income and Expenditure Account 1
Share of overall impact due credited to the HRA 0
Other accounting presentational changes
Decrease in fair value of fixed rate debt borrowings (disclosure
confined to notes to the core financial statements) 8,616
The impact of a 1% fall in interest rates would be as above but with the changes being reversed.

Page 76

Page 74
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Management of Foreign Exchange Risk 
The Council does not lend or borrow in foreign currencies and has no exposure to gains or losses arising from
movements in exchange rates. 
Note 22 Defined Benefit Pension Scheme
As part of the terms and conditions of employment of its officers and other employees, the Council offers retirement
benefits. Although these benefits will not actually be payable until employees retire, the Council has a commitment to
make the payments that needs to be disclosed at the time that employees earn their future entitlement. 
The Council participates in the following pension schemes: 
The Local Government Pension Scheme - a defined benefit statutory scheme, operated as Strathclyde Pension
Fund, and administered by Glasgow City Council in accordance with the Local Government Pension Scheme (Scotland)
Regulations 1998. This is a funded scheme, meaning that the Council and employees pay contributions into a fund,
calculated at a level intended to balance the pensions liabilities with investment assets. The employer’s contribution rate
is set by the Fund actuaries following valuation. 
The Teachers’ Pension Scheme (Scottish Teachers’ Superannuation Scheme (STSS) - a defined benefit
scheme administered by the Scottish Public Pension Agency. The scheme is technically a multi-employer defined benefit
scheme but is unfunded and the Scottish Government used a notional fund as the basis for calculating the employers’
contribution rate paid by local authorities. Due to the type of scheme, the Council is not able to identify its share of the
underlying financial position and performance of the scheme with sufficient reliability for accounting purposes. For the
purpose of this Statement of accounts, it is accounted for on the same basis as a defined contribution scheme. 
The employer pays a set contribution rate of 26%.  This is charged directly to the revenue account for the Education
service. The amount paid over in respect of employer’s contribution was £13.805m (2024/25 £13.347m) and in respect
of expenditure for teachers added years, £0.692m payments were made (2024/25 £0.056m). 
The scheme is unfunded and all contributions (payable by members or employers) are paid to the Scottish Government,
and the Scottish Government then meets the costs of all the benefits. A specific amount is held by the Scottish
Government for this purpose. 
The Council is not liable to the scheme for any other entities obligations under the plan. 
Local Government Pension Scheme: 
Councils are required to disclose the capital cost of discretionary increases in pension payments agreed by the Council.
In 2025/26 the capitalised costs that would have arisen from the early retiral of the Council employees and from
predecessor authorities were as follows: 
£'000
2025/26 (396)
In earlier years 37,416    
Total 37,020     
The Council fully complies with the International Accounting Standard (IAS 19) concerning the disclosure of information
on the pension. IAS 19 states that although the pension benefits will not be paid until the employee retires, the Council
has a commitment to make these payments and must disclose the cost of this in its accounts at the time employees
earn their full entitlement. 
The Council therefore recognises the cost of the pension commitment within the Comprehensive Income and
Expenditure Account when the employees earn their pension entitlement rather than when the benefits are paid as

Page 77

Page 75
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
pensions. However, the cost to the taxpayer is calculated on the basis of pension contributions paid in the year, the cost
of retirement benefits under IAS19 is reversed out, to ensure there is no impact on the overall cost to be funded by
council tax and government grant.
24/25 25/26
£'000 £'000
Net cost of services
23,666 Current service cost 18,132
1,175 Past service cost 1,636
24,841 19,768
Financing and investment Income and
Expenditure
2,377 Net interest expense/(income) 2,370
27,218 Total post employment benefit charged to the
Surplus or Deficit on the provision of Services
22,138
14,156 Expected return on assets (39,583)
(1,412) Actuarial gains and losses arising from changes in
demographic assumptions
4,682
(126,100) Actuarial gains and losses arising from changes in
financial assumptions
(22,240)
(9,221) Actuarial gains and losses arising from experience
assumptions
6,847
101,825 Asset Ceiling Adjustment 39,880
(20,752) Total remeasurements recognised in other
Comprehensive Income
(10,414)
6,466 Total post employment benefit charged to the
comprehensive income and expenditure
statement
11,724
Movement in Reserves Statement
(27,218) Total post-employment benefits charged to the
surplus or deficit on provision of service
(22,138)
12,062 Actual amount charged against the General Fund
balance in the year - employer contributions
payable to Scheme
12,120
(15,156) Reversal of gross charges made to surplus or
deficit for post employment benefits
(10,018)
Reconciliation of Asset Ceiling Adjustment: 
2024/25 2025/26
£'000 £'000
345,336 Effect of asset ceiling at 1 April 463,737
16,576 Interest on the effect of the asset ceiling 26,878
101,825 Change in the effect of the asset ceiling 39,880
463,737 Effect of asset ceiling at 31 March 530,495
The underlying assets and liabilities for retirement benefits attributable to the Council as at 31 March are as follows:
2024/25 2025/26
£'000 £'000
1,162,149 Fair value of plan assets 1,255,430
(698,412)
Present value of defined benefit
obligations (724,935)
(463,737) Asset ceiling adjustment (530,495)
0
Net assets in the Strathclyde Pension
Fund 0
Present Value of Unfunded Liabilities
(20,125) LGPS Unfunded (20,096)
(17,291) Teachers’ pensions (16,924)
0 Pre Local Government Reorganisation 0
(37,416) Net pension asset/(liability) (37,020)

Page 78

Page 76
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
The liabilities show the underlying commitments that the Council has in the long run to pay post-employment (retirement)
benefits. 
The amount included in the Balance Sheet arising from the Council’s obligation in respect of its defined benefit plans is
shown in the tables below. The net asset arising from the Council’s involvement in the defined benefit scheme totals
£530.495m at 31 March 2026. However the funded obligation has been limited to nil in line with the accounting
requirements of IFRIC 14 to limit the recognition of a pension asset to the extent to which the Council can recover the
benefits through either refunds or reduced contributions. As the Council is not able to withdraw from the scheme or
recover funds directly, the asset is therefore limited to the forecast reductions in contributions as compared to the
forecast future service costs. This has limited the recognition of the funded pension asset to nil. The Council has
continued to recognise the unfunded element of its pension liabilities as there are no scheme assets to cover the future
costs of these liabilities as they are due going forward. 
The Council’s Local Government Pension Scheme has a material surplus as at 31 March 2026. The Council accounts
for its pension fund using International Accounting Standards IAS 19. The surplus asset is to be determined as outlined
in IFRIC 14 based on the expected future reduction in accounting contributions. The fund remains open to new
employees therefore the potential future benefits have been measured in perpetuity. 
The fair value of plan assets has increased by £93.281m. This is mainly due to a higher than assumed investment
returns. 
The estimated liabilities have increased by £26.127m, due to an increase in the discount rate. 
Pension Assets and Liabilities
Liabilities have been valued on an actuarial basis using the projected unit method which assesses the future liabilities
of the fund discounted to their present value. The liabilities have been assessed by Hymans Robertson, an independent
firm of actuaries, contracted by Glasgow City Council to provide all IAS19 calculations on behalf of the councils within
the Strathclyde Pension Fund. The funded obligation is noted below: 
£'000 % £'000 %
336,705 47.1% Active Members   369,278 49.0%
66,952 9.4% Deferred Members     67,388 8.9%
294,755 39.4% Pensioner Members   288,269 38.2%
29,683 4.1% Pre-Local Government Re-organisation
Members     28,926 3.8%
728,095 100%   753,861 100%
2024-25 2025-26
The movement during the year on the defined obligation is noted as: 
2024/25 2025/26
£'000 £'000
833,026 Opening balance 735,828
23,666 Current service cost 18,132
39,947 Interest cost 42,515
6,970 Contributions by Members 7,106
(1,412) Actuarial gains/losses – change in demographic assumptions 4,682
(126,100) Actuarial gains/losses – change in financial assumptions (22,240)
(9,221) Actuarial gains/losses – other experience 6,847
1,175 Past service costs/(gains) 1,636
(3,315) Estimated unfunded benefits paid (3,313)
(28,908) Estimated benefits paid (29,238)
735,828 Closing Balance as at 31 March 761,955

Page 79

Page 77
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
The movement during the year on the fair value of the employer’s assets is: 
2024/25 2025/26
£000 £000
1,135,350 Opening balance 1,162,149
(14,156) Expected return on assets 39,583
0 Actuarial gains/ losses - other experience 0
54,146 Interest Income 67,023
6,970 Contributions by Members 7,106
8,747 Contributions by Employer 8,807
3,315 Contributions in respect of unfunded benefits 3,313
(3,315) Estimated unfunded benefits paid (3,313)
(28,908) Estimated benefit paid (29,238)
0 Other adjustment* 0
1,162,149   Closing Position as at 31 March 1,255,430     
The Council’s share of the pension fund asset at 31 March 2026 comprised: 
Quoted
prices in
Active
Markets
Prices not
quoted in
Active
Market
Total Quoted prices
in Active
Markets
Prices not
quoted in
Active
Market
Total
£'000 £'000 £'000 Asset Category £'000 £'000 £'000
240,752 750 241,502 Equity Securities 263,999 908 264,907
0 268,632 268,632 Private Equity 0 301,078 301,078
0 87,682 87,682 Real Estate 0 87,025 87,025
4,255 531,801 536,056 Investment funds and unit
trusts
0 561,935 561,935
0 28,277 28,277 Cash and Cash Equivalent 0 40,486 40,486
245,007 917,142 1,162,149 Total 263,999 991,432 1,255,431
2024/25 2025/26
Assets are now held at bid value.
Asset and Liability Matching strategy
The main fund of Strathclyde Pension Fund does not have an asset and liability matching strategy (ALM) as this is used
mainly by mature funds. The Fund does match, to the extent possible, the types of assets invested to the liabilities in
the defined benefit obligation. As is required by the pensions and investment regulations, the suitability of various types
of investment has been considered, as has the need to diversify investments to reduce the risk of being invested into
narrow a range. The Fund invests in equities, bonds, properties and in cash. 
The Fund has now taken account of the national change to the Local Government Pension Scheme in Scotland such
as the new career average revalued earning scheme (CARE) for future accruals. 
The actuarial valuation states that assets held on the valuation date were sufficient to cover 158% (2024/25 158%) of
accrued liabilities at that date. 
The principal actuarial assumptions used at the Balance Sheet date are as follows:
31 March 2025 31 March 2026
Long term expected return on assets
2.80% Pension increase rate 3.00%
3.50% Salary Increase rate 3.70%
4.80% Discount rate 6.20%
Mortality
Based on these assumptions, the average
future life expectancies at the age of 65 are:
19.3 Current pensioners – Men 19.7
22.0 Current pensioners - Women 22.2
19.9 Future pensioners – Men 20.2
23.7 Future pensioners - Women 23.9

Page 80

Page 78
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
The above excludes any net pension liability that the Council may have to contribute to in respect of the Joint Boards of
Partnership for Transport and Valuation. These costs are shown within each Joint Board’s Balance Sheet and the
Council may be required to make an increased constituent contribution in the years when the liability fails to be met. 
The principal risks to the Council of the scheme are the longevity assumptions, statutory changes to the scheme,
structural changes to the scheme (i.e. large-scale withdrawals from the scheme), changes to inflation, bond yields and
the performance of the equity investments held by the scheme. These are mitigated to a certain extent by the statutory
requirements to charge to the General Fund and Housing Revenue Account the amounts required by statute as
described in the accounting policies note. 
Impact on the Council’s Cash Flow
The objectives of the Fund are to keep employers’ contributions at as constant a rate as possible. The Fund has agreed
a strategy to achieve a funding rate of 100% in the longer term. The Scheme is a multi-employer defined benefit plan
and employers’ contributions have been determined so that employee and employer rates are standard across all
participating Local Authorities. Employer’s contributions have been set at 17.5% for 2026/27 (2025/26: 6.5%). The
Council paid an employer’s contribution of £8.807m (2024/25: £21.154m). 
The total contributions expected to be made to the Local Government Pension Scheme by the Council in the year to 31
March 2027 is £7.653mm. This is based on an assumed pensionable payroll of £120.882m.  The duration of the
Employer’s funded obligations is 17 years. 
Sensitivity Analysis
In order to quantify the impact of a change in the financial assumptions used, the actuaries have calculated and
compared the value of the scheme liabilities as at 31 March 2026 on varying bases. The approach taken is consistent
with that adopted to derive at the IAS19 figures provided. To quantify the uncertainty around life expectancy, the
actuaries have calculated the difference in cost to the employer of a one-year increase in life expectancy. For sensitivity
purposes, this is assumed to be an increase in the cost of benefits of around 3% to 5%. In practice the actual cost of a
one-year increase in life expectancy will depend on the structure of the revised assumption (i.e. if improvements to
survival rates predominately apply at younger or older ages). 
The figures have been derived based on the membership profile of the Employer as at the date of the most recent
actuarial valuation. 
The estimation of defined benefit obligation is sensitive to the actuarial assumptions. The sensitivity 
regarding the principal assumptions used to measure the schemes liabilities are set out below: 
Approximate % increase to
Employer Liability
Approximate monetary
Amount (£'000)
Real Discount Rate (0.1% decrease ) 2% 11,734
1 year increase in the member life expectancy 4% 30,478
Salary Increase Rate (0.1% increase) 0% 790
Pension Increase Rate (0.1% increase) 1% 10,928
The total contribution expected to be made to the Local Government pension scheme for 2026/27 is £21.154m.
Note 23 Termination Benefits
A number of savings options have been agreed at Council budget meetings to balance the Council budget. A number
of these options were reliant on a reduction in the Councils establishment. The Council had forewarning of the level of
savings required to balance the budget and had previously asked all Council employees to express an interest in
voluntary redundancy. As a result of the budget savings options approved by the Council a number of employees had
their redundancy application accepted. 
Redundancy costs have been incurred in prior years in relation to the budget savings agreed. In each year, provision
was made within the financial year for the costs of all employees who had accepted redundancy or where redundancy

Page 81

Page 79
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
was probable as at 31 March ending that year, including accounting for costs for employees who confirmed redundancy
by 31 March but left or were leaving after this date. 
Termination costs for all Council employees who have accepted redundancy by 31 March 2026 are recognised in the
Exit Packages note in 2025/26, or in previous financial years. The total cost recognised in the Exit Packages note in
2025/26 is £1.241m for 45 employees and in 2024/25 was £1.645m for 42 employees. These costs are detailed further
in Table 8 of the Remuneration Report on page 30. 
The reduction in the staffing establishment includes posts from all services across the Council and reductions were in
line with the savings agreed by the Council. There will be further redundancy costs incurred as the Council is required
to make further savings to balance the budget in future years and the Council have earmarked monies from the loans
fund one-off reprofiling gain.
Note 24 Other Reserves
Reserves are created by appropriating amounts from the General Fund balance in the Movement in Reserves
Statement. When expenditure to be financed from a reserve is incurred, it is charged to the appropriate service within
the CIES. The reserve is then appropriated back into the General Fund balance in the Movement in Reserves Statement
so that there is no net charge against Council Tax for the expenditure. 
Usable Reserves 
Usable reserves are those that the Council is able to apply to fund expenditure or reduce taxation and comprise of both
capital and revenue reserves. Movement in the revenue reserves during the year are outlined in the Movement in
Reserves Statement, however, a summary is shown below: 
31 March 2025 31 March 2026
£'000 £'000
12,272 General Services 24,924
611 Housing Revenue Account 1,122
0 Capital Receipts Unapplied 0
242 Other Reserves 239
13,125 Total Usable Reserves 26,285
General Fund Revenue Reserve: The General Fund is held for services provided by the Council through Revenue
Support Grant funded through the Scottish Government and council tax. It excludes the Housing Revenue Account.
This reserve holds funds not yet spent. 
Housing Revenue Account Revenue Reserve: The Council is required by the Local Government and Housing Act
(Scotland) 1987 to keep a Housing Revenue Account (HRA) which records all revenue expenditure and income
relating to the provision of council dwellings and related services. This reserve holds funds not yet spent. 
Capital Receipts Reserves: Capital receipts from asset sales are retained within this Reserve and used to fund
planned capital expenditure. 
Capital Grant and Reserves Unapplied Reserve: Grants and other contributions given to the Council are retained
within this Reserve until all conditions agreed by the grant provider are satisfied. This Reserve is also used to fund
transformational projects from capital receipts. 
Capital Items Replacement Fund (Other): This reserve holds funds which are retained and used for the renewal or
repair of school non-current assets. 
Unusable Reserves
Certain reserves are kept to manage the accounting process for non-current assets, financial instruments, retirement
and employee benefits and do not represent usable resources for the authority. These reserves are explained on the
following pages.

Page 82

Page 80
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Summary of Year-end Balances 
The total for Unusable Reserves in the Balance Sheet is made up of the following reserves:
31 March 2025 31 March 2026
£'000 £'000
216,313 Capital Adjustment Account 198,564
190,406 Revaluation Reserve 156,230
(37,416) Pension Reserve (37,020)
(4,826) Employee Statutory Adjustment Account (5,038)
(10,549) Financial Instruments Adjustment Acccount (9,792)
353,928 Total Unusable Reserves 302,944 
Movement on balances - Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements for accounting
for the consumption of non-current assets and for financing the acquisition, construction or enhancement of those assets
under statutory provisions. 
31 March 2025 31 March 2026
£'000 £'000
221,730 Opening Balance 216,313
(34,429) Depreciation (39,918)
(1,844) Impairment (21,125)
(3,260) Service concession adjustment (3,991)
1,960 Write off Revaluation reserve Balance (disposals) 399
(3,352) Disposal of Fixed Assets (8,507)
21,249 Government Grants Applied 35,738
(51) Capital Financed by Current Revenue 2,247
14,310 Long Term Debt Payment 17,408
216,313 Closing Balance 198,564
Movement on Balances – Revaluation Reserve
The revaluation reserve contains the gains made by the Council arising from increases in the value of its property, plant
and equipment (and intangible assets).  The reserve contains only revaluation gains accumulated since 1 April 2007,
the date that the reserve was created. Accumulated gains arising before that date are consolidated into the balance on
the capital adjustment account.
31 March 2025 31 March 2026
£'000 £'000
183,856 Opening Balance 190,406
14,109 Unrealised Gains on Revaluation of Assets 9,838
(7,284) Impairments and Losses on Revaluation of Assets (43,616)
(1,960) Write off revaluation Balance (Disposal) (398)
1,685 Depreciation due to Revaluation of Assets 0
190,406 Closing Balance 156,230 
Movement on Balances – Pensions Reserve
The pension reserve absorbs the timing differences arising from the different arrangements for accounting for post-
employment benefits and for funding benefits in accordance with statutory provisions.  The triennial review by the
Pension Fund in 2023 set employer’s contribution rates for the Council at 6.5% for the period 1 April 2024 to 31 March
2026 and 17.5% thereafter.  The Council accounts for postemployment benefits in the comprehensive income and
expenditure as the benefits are earned by employees accruing years of service, updating the liabilities recognised to
reflect inflation, changing assumptions and investment returns on any resources set aside to meet the costs. However
statutory arrangements require benefits earned to be financed as the Council makes employer’s contributions to pension
funds or eventually pays any pension for which it is directly responsible.

Page 83

Page 81
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
31 March 2025 31 March 2026
£'000 £'000
(43,012) Opening Balance (37,416)
20,752 Actuarial (Loss)/Gain 10,414
8,747 Employer Contributions 8,807
(23,903) Reversal of IAS19 Entries (18,825)
(37,416) Closing Balance (37,020)
Movement on Balances - Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on the General Fund
balance from accruing for compensated absences earned but not taken in the year e.g. annual leave entitlement
carried forward at 31 March.
31 March 2025 31 March 2026
£'000 £'000
(4,537) Opening Balance (4,826)
(289) Staff Accrual Movement (212)
(4,826) Closing Balance (5,038)
Movement on Balances -   Financial instrument Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing difference arising from the different arrangements for
accounting for income and expenses relating to certain financial instruments and for bearing losses or benefiting from
gains per statutory provisions. The Council uses the account to manage premiums paid on the early redemption of
loans. Premiums are debited to the comprehensive income and expenditure statement when they are incurred but
reversed out of the general fund balance to the account in the movement in reserves statement. Over time, the expense
is posted back to the general fund balance in accordance with statutory arrangements for spreading the burden on
council tax. In the Council’s case, this period is the unexpired term that was outstanding on the loans when they were
redeemed. As a result, the balance on the account as at 31 March 2025 will be charged to the General Fund over the
next thirty-six years. 
31 March 2025 31 March 2026
£'000 £'000
(11,147) Opening Balance (10,549)
568 Annual Write off of Premiums and Discounts 537
0 New Premiums and Discounts 0
30 Annual EIR Adjustment to Stepped Interest Instruments 220
(10,549) Closing Balance (9,792)
Note 25 Related Parties
The Council is required to disclose material transactions with related parties – bodies or individuals that have the
potential to control or influence the Council or to be controlled or influenced by the Council. Disclosure of these
transactions and balances allows readers to assess the extent to which the Council might have been constrained in its
ability to operate independently or might have secured the ability to limit another party’s ability to bargain freely with the
Council. 
The Scottish Government 
The Scottish Government has significant influence over the general operations of the Council, being responsible for
providing the statutory framework within which the Council operates. The Scottish Government also provides the
majority of the Council’s funding in the form of grants and prescribes the terms of many of the transactions that the
Council has with other parties (such as Council Tax bills and Housing Benefits). Grants received from the Scottish
Government are disclosed in Note 9 Taxation and Non-specific Grant Income on page 57.

Page 84

Page 82
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Elected Members Elected 
Members of the Council have direct control over the Council’s financial and operating policies. The total of members’
allowances paid in 2025/26 is shown within the Remuneration Report. There are no other significant related party
transactions with members of the Council. Elected Members are required to declare an interest if he or she believes
that there may be a perception that their decision making may be influenced in any way by a personal interest. Should
this arise, the relevant Member does not take part in any discussion or decision relating to that interest. The Register of
Interests of each Member is available on the Councils’ website: Councillors Allowances
Senior Officers 
Senior Officers, as listed within the Remuneration Report, are required to declare an interest if he or she believes that
there may be a perception that their decision making may be influenced in any way by a personal interest.  
Entities Controlled or Significantly Influenced by the Council 
The Council has entered into a number of transactions under subsidiaries, associates and other trading arrangements
deemed to be a related party mainly through the Council’s ability to exert influence over the entity through its
representation on the respective Boards. The relevant transactions with the bodies are detailed below. 
Income
from
Related
Parties
Expenditure
to Related
Parties
Amounts
due to
Related
Parties
Amounts
owed by
Related
Parties
Income
from
Related
Parties
Expenditure
to Related
Parties
Amounts
due to
Related
Parties
Amounts
owed by
Related
Parties
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Subsidiaries
West Dunbartonshire Leisure Trust (215) 5,761 1,016 808 (212) 6,501 391 920
Clydebank Property Company (387) 0 10 1 (357) 269 0 (1)
West Dunbartonshire Energy LLP 0 574 0 2,004 0 637 0 2,597
Associates and Joint Ventures
Dumbartonshire and Argyll and Bute
Valuation Joint Board (142) 781 560 0 (146) 827 560 0
West Dunbartonshire Health & Social
Care Partnership (89,830) 89,830 0 0 (94,103) 94,103 0 0
Non-Material Interest in Other Entities 0 0 0
Strathclyde Partnership for Transport 0 2,366 0 0 0 2,458 0 0
Strathclyde Concessionary travel
Scheme Joint Board 0 165 0 0 0 169 0 0
Strathclyde Pension fund 0 16,081 1,166 0 0 15,142 7 0
Clydebank Municipal Bank 0 0 12 (5) 0 0 11 (6)
2024-25 2025-26
*Further details of these entities are disclosed in the group Accounts Note 30 Combining Entities.
Note 26 Agency Services  
Where the Council acts as an agent for another entity, transactions are not reflected in the Council’s financial statements,
with the exception of cash collected or expenditure incurred by the Council on behalf of the other entity, in which case
there is a debtor or creditor position in the balance sheet for amounts due or owed. 
The Council bills and collects Non-Domestic Rates on behalf of the Scottish Government. During 2025/26 the Council
collected £87.680million and received £84.737 million to the Non-Domestic Rates pool (2024/25: £84.519 million and
£87.481 million). The Council also bills and collects domestic water and sewerage charges on behalf of Scottish Water
with the Council Tax. During 2025/26 the Council collected and paid over £18.787 million (2024/25: £17.578 million)
and is due to receive £0.259 million (2024/25: £0.082 million) for providing this service.
Note 27 Financial Guarantees
In terms of West Dunbartonshire Leisure Trust’s admission to the Strathclyde Pension Scheme, the Council has
guaranteed to accept liability for any unfunded pension costs should they cease to exist, withdraw from the Scheme or
become unable to meet any unfunded liability. The Council has not quantified the possible liability.

Page 85

Page 83
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 28 Contingent Assets and Liabilities
A contingent asset arises where an event has taken place that gives the Council a possible asset whose existence will
only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the control of the Council.
Contingent assets are not recognised in the Balance Sheet but disclosed in a note to the accounts where it is probable
that there will be an inflow of economic benefits. 
A contingent liability arises where an event has taken place that gives the Council a possible obligation whose existence
will only be confirmed by the occurrence or otherwise of uncertain future events, not wholly within the control of the
Council. Contingent liabilities also arise in circumstances where a provision would otherwise be made but either it is not
probable that an outflow of resources will be required or the amount of the obligation cannot be measured reliably.
Contingent liabilities are not recognised in the Balance Sheet but are disclosed as a note to the accounts, unless the
possibility of an outflow of resources embodying economic benefits or service potential is remote. 
The Council has a residual contingent liability relating to those workers who have yet to settle their pay protection claims.
The Council has a potential contingent liability relating to paid holiday entitlement. Following an EU ruling UK employers
are bound by employment law in relation to the definition of paid holiday entitlement. Case law has clarified that all pay
elements intrinsically linked to the performance of a contract of employment should be included in the calculation of
holiday pay, including payments made for additional working. The Council adjusted the method of calculation in August
2014 (backdated in line with the leave year to April) and has included on-going costs within the long-term financial
strategy. The legal position remains subject to challenge however, given the action taken, any potential claim by
employees for any retrospective payments is likely to be minimal. As a result, whilst recognising there may be such a
requirement, it is not possible to quantify such.
The Council has outstanding employment tribunals, if the Employees’ action is successful will result in a liability to the
Council. 
The Limitation (Childhood Abuse) (Scotland) Act 2017 Section 1 removes the limitation period for actions of damages
in respect of personal injuries resulting from childhood abuse. At this stage the extent of any potential liability is unknown. 
The Council has a potential contingent liability relating to the defined pension scheme.  In June 2023 the High Court
ruled in the Virgin Media Limited v NTL Pension Trustees II Limited (and others) case regarding the validity of
amendments to post 6 April 1997 benefits in formerly contracted-out defined benefit pension schemes. In a judgement
delivered on 25 July 2024, the Court of Appeal unanimously upheld the decision of the High Court. This ruling may have
a potential future impact on the Local Government Pension Scheme benefits as the Local Government Pension scheme
has made amendments since 1997 and these amendments did impact member benefits.  No adjustments have been
made to the financial statements, as it is not clear if the specific circumstances of the Council’s LGPS are relevant and
if the Pension Fund obtained the necessary documentation to support amendments at the time. Should this be the case,
the impact of the ruling has not yet been determined and would require significant investigation to quantify any potential
impact on the Council’s liabilities, and so is not quantifiable at this stage.  
Recent geopolitical tensions in the Middle East, including disruption in the Strait of Hormuz, have increased uncertainty
in global markets and are expected to influence future economic conditions. At present, there has been no direct financial
impact on the Council. However, emerging pressures on fuel and energy prices, alongside the rising cost of materials
dependent on petrochemicals, may affect both revenue and capital budgets during 2026/27. In addition, ongoing
volatility in borrowing costs may also have financial implications. The extent of any impact cannot yet be quantified and
may not be limited to these areas.
The procurement of capital projects is subject to heightened risk in the current market environment. For contracts already
signed, there is potential exposure to contract variations, particularly where delivery timelines may need to be extended.
The risk is more significant for projects that have not yet reached financial close, as contractors are exercising greater
caution, and market volatility is increasingly reflected in pricing and risk premiums within bids.  Rising costs for materials
and labour, alongside the financial implications of longer construction timelines, add further uncertainty to both revenue
and capital budgets. At this stage, the scale of any impact remains uncertain and cannot be reliably quantified.
Appropriate governance and oversight will continue to be applied as required.

Page 86

Page 84
Notes to the Financial Statements         
West Dunbartonshire Council Annual Accounts 2025/26
Official
The Council is not aware of any other contingent assets or liabilities which may be outstanding.
Note 29 Fees Payable to External Auditors
In 2025/26 the following fees relating to external audit and inspection were incurred alongside comparative figures for
2024/25: 
2024-25 2025-26
£'000 Auditor's Remuneration £'000
341 Fees payable to Audit Scotland with regard to external audit
services carried out by the appointed Auditor 370
341 Total Remuneration 370
The figure above includes fees for the audit of the Council’s charitable trusts. 
Forvis Mazars have been appointed as external auditors for 2025/26. Forvis Mazars did not undertake any non-audit
work in 2025/26.
Note 30 Events After the Balance Sheet Date
These are events, both favourable and unfavourable, that occur between the end of the reporting period and the date
when the Statement of Accounts is authorised for issue. An adjustment is made to the financial statements where there
is evidence that the event relates to the reporting period; otherwise the financial statements are not adjusted, and where
the amount is material, a disclosure is made in the notes. 
The Chief Officer - Resources issued the unaudited Statement of Accounts on 17 June 2026. There have been no
material events after the balance sheet date which necessitate revision of figures in the financial statements or notes
thereto including contingent assets or liabilities

Page 87

Page 85
Housing Revenue Account         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Housing Revenue Account
Movement on the Housing Revenue Account Statement
This statement shows the movement in the year on the Housing Revenue Account reserve. The surplus or (deficit) on
the housing revenue account income and expenditure statement is reconciled to the surplus or deficit for the year on
the housing revenue account balance, calculated in accordance with the Housing (Scotland) Act 1987. 
2024/25 2025/26
£'000 £'000
(970) Balance on the Housing Revenue Account as at 1 April (611)
(1,719) Total Comprehensive Income and Expenditure 13,510
(744) Pension Scheme Adjustments (545)
2 Financial Instruments Adjustment 104
3 Holiday Pay Adjustment 7
(6,948)
Reversal of entries included in the Surplus/Deficit on the Provision of Services in relation to
capital expenditure (27,021)
(7,687) Adjustments to the revenue resource (27,455)
0 Net gain or loss on sale of non-current assets 0
9,765 Statutory Repayment of Debt (Loans Fund Advances) 11,442
0 CFCR 1,992
9,765 Adjustments between Revenue and Capital Resources 13,434
2,078 Total Statutory Adjustments (14,021)
0 Transfers (to)/from Other Statutory Reserves 0
359 (Increase)/Decrease in Year (511)
(611) Balance on the Housing Revenue Account as at 31 March (1,122) 
Housing Revenue Account Income and Expenditure Statement
The HRA income and expenditure statement shows the economic cost in the year of providing housing services in
accordance with generally accepted accounting practices rather than the amount to be funded from rent and government
grants. The Council charges rent to cover expenditure in accordance with regulations; this may be different from the
accounting cost. The increase or decrease in the year, on the basis of which rents are raised, is shown in the Movement
on the HRA Statement.
2024/25 2025/26
£'000 £'000
Income
(51,170) Dwelling Rents (net of voids) (56,139)
1,002 Void loss 816
(158) Other Rents (162)
(2,693) Other Income (6,506)
(53,019) (61,991)
Expenditure
12,227 Repairs and Maintenance 15,384
14,657 Supervision and Management 15,372
14,862 Depreciation and Impairment 36,952
214 Other Expenditure 145
41,960 67,853
(11,059)
Net Cost of Service as Included in the Council Comprehensive
Income and Expenditure Statement 5,862
HRA Share of the Operating Income and Expenditure Included
in the Comprehensive Income and Expenditure Statement
(7,914) Recognised Capital Income (Grants, Contributions and Donations) (9,930)
15,820 Interest Payable and Similar Charges 15,436
1,174 Amortisation of Premiums and Discounts 1,788
260 Impairment Loss - Debtors 354
9,340 7,648
(1,719) (Surplus)/Deficit for the year on HRA Services 13,510

Page 88

Page 86
Housing Revenue Account         
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Notes to the Housing Revenue Account Income and Expenditure Statement
Note 1 The number and types of dwellings in the council’s stock
The Council was responsible for managing 10,581 dwellings during 2024/25 (10,547 in 2024/25). The following shows
an analysis of these dwellings by type. 
2024/25 2025/26
Number at 31
March 2025
Average
weekly rent
Number at 31
March 2026
Average
weekly rent
£ Type of Dwelling £
2,770 90.81 Two-apartment 2,821 96.34
4,733 93.39 Three-apartment 4,689 100.58
2,655 99.27 Four-apartment 2,670 106.30
359 107.87 Five-apartment 371 113.12
23 121.41 Six-apartment 23 135.05
3 266.82 Seven-apartment 3 288.16
2 109.12 Eight-apartment 2 117.85
2 109.12 Nine-apartment 2 105.35
10,547 Total 10,581 
Note 2 Dwelling Rents
The £55.323m noted in the Income and Expenditure Statement is the total rental income less voids chargeable for the
year of £0.815m (£1.002m in 2024/25). The £55.323m excludes irrecoverable and bad debts.
Average rents were £101.46 per week in 2025/26 (£94.80 per week in 2024/25). 
Note 3 Other Rents
This is the total income received from travelling person site rentals, lockups and shops less voids chargeable for the
year, excludes irrecoverable and bad debts.  Lost rents from lockups in 2025/26 were £0.099m (£0.090m in 2024/25) 
Note 4 Rent arrears
As at 31 March 2026, total rent arrears amounted to £4.662m (2024/25 £4.876m). This is 8.46% of the total value of
rents due at 31 March 2026. It should be noted that the total arrears do not all relate to 2025/26. The year-on-year
movement in value of arrears is an increase of £0.214m. 
Note 5 Provision for Bad Debts
In the financial year 2025/26, the rental bad debt provision was increased by £0.199m in 2025/26. (Increase of £0.488m
in 2024/25). The total rental bad debt provision on 31 March 26 was £2.867m - equivalent of 63% (63% 2024/25) of the
total value of rents due at that date.

Page 89

Page 87
Council Tax Income Account                                   
West Dunbartonshire Council Annual Accounts 2025/26
Official
Council Tax Income Account
The Council Tax Income Account shows the gross income raised from Council Taxes levied and deductions made under
statute.  The resultant net income is transferred to the Comprehensive Income and Expenditure Statement of the
Council.
2024/25 2025/26
£'000 £'000
59,545 Gross council tax 66,600
Less:
(9,141) Council Tax Reduction Scheme Discount* (10,260)
(7,381) Other discounts and reductions (8,202)
(731) Provision for bad and doubtful debts 658
(591) Adjustments for prior years (2,847)
41,701 Transfer to General Fund 45,949
Dwellings are valued by the Assessor and placed within a valuation band ranging from the lowest “A” to the highest “H”.
The Council Tax charge is calculated using the Council Tax Base, Band D equivalent as below. This value is then
decreased or increased dependent upon the band of the dwelling. The charge for each band for 2024/25 was as follows:
2024/25 2025/26
£ per year £ per year
777.21 Band A* 886.59
932.65 Band A 1,039.90
1,088.10 Band B 1,213.23
1,243.54 Band C 1,386.55
1,398.98 Band D 1,559.86
1,838.10 Band E 2,049.48
2,273.34 Band F 2,534.77
2,739.67 Band G 3,054.73
3,427.50 Band H 3,821.66
Calculation of the Council Tax base
Band
No of
Dwellings
No of
Exemptions
Disabled
Relief
Discounts
25%
Discounts
50%
CTRS
Discount
Total
Dwellings
Ratio to
Band D
Band D
Equivalent
A(Disabled) 0 0 0 9 0 8 21 200/360 12
Band A 7,447 326 18 4,331 56 3,709 8,454 240/360 5,636
Band B 16,892 506 49 8,408 8 5,876 18,126 280/360 14,098
Band C 7,905 192 (6) 3,211 25 1,837 8,192 320/360 7,282
Band D 6,289 129 (6) 2,202 11 736 6,128 360/360 6,128
Band E 4,969 78 19 1,203 18 255 4,697 473/360 6,171
Band F 1,848 20 (46) 308 5 46 1,762 585/360 2,863
Band G 849 13 (15) 115 2 24 810 705/360 1,586
Band H 70 1 (11) 8 2 2 66 882/360 162
43,938
422
44,360
Provision for bad debt
Council Tax Base
Discounts, Reliefs and Exemptions 
A council tax bill is reduced by 25% where a property has only one occupant or 50% where the property is empty. For
council tax purposes certain students are not regarded as occupants. Certain properties may also qualify for relief if the
property has been adapted for a disabled person. Properties undergoing major renovation or held pending demolition
may be awarded exemption from council tax.

Page 90

Page 88
Non-Domestic Rate Income Account                                   
West Dunbartonshire Council Annual Accounts 2025/26
Official
Non-Domestic Rates Income Account
The Non-Domestic Rate Income Account is an agent’s statement that reflects the statutory obligation for billing
authorities to maintain a separate Non-Domestic Rate Account. The statement shows the gross income from the rates
and deductions made under the Local Government (Scotland) Act 1975 as amended by the Local Government Finance
Act 1992 on non-domestic property. The net income is paid to the Scottish Government as a contribution to the national
non-domestic rate pool.
2024/25 2025/26
£'000 £'000
100,028 Gross rates levied 100,514
Less:
(10,004) Reliefs and other deductions (10,149)
(1,000) Provision for bad and doubtful debts (1,005)
89,024 Net non-domestic rate income 89,360
(3,848) Adjustments for prior years (1,944)
(657) Adjustments for prior years - bad debt 264
84,519 Total Non Domestic Rate Income (before retention) 87,680
0 Non Domestic Rate Income Retained by the Council (BRIS) 0
84,519 Contribution to National Non Domestic Rate Pool 87,680
87,481 Distribution from National Non Domestic Rate Pool 84,737
(2,962) Net contribution to/(from) National Non Domestic Rate Pool 2,943
87,481
Net Non Domestic Rate Income to Comprehensive Income &
Expenditure Statement 84,737 
The non-domestic rates pool operates on a cash accounting basis and as such the non-domestic rate income account
within the Council is calculated on a similar basis. 
Analysis of Rateable Values
Analysis of rateable Values: £
Rateable value at 1/4/25 182,462,334
Running roll (full year RV) (1,363,705)
Rateable value at 31/3/26 181,098,629
Less: partially exempt (725,585)
Less: wholly exempt (1,428,695)
Net rateable value at 31 March 2026 178,944,349
Non-Domestic Rate Charge
The amount paid for non-domestic rates is determined by the rateable value placed on the property by the Assessor
multiplied by the rate per £ announced each year by the government.
The national non-domestic rate poundage set by the First Minister for Scotland for 2025/26 was:
2024-25 2025-26
Pence Pence
49.8pBasic Property Rate per £ 49.8p
4.7pSuplementary Rate per £ for Properties between £51,000 and £100,000 5.6p
6.1pSuplementary Rate per £ for Properties over £100,000 7.0p

Page 91

Page 89
Common Good Fund                                             
West Dunbartonshire Council Annual Accounts 2025/26
Official
Common Good Fund
The Council administers the Dumbarton Common Good Fund Account. The Fund is applied for the benefit of the people
of Dumbarton. The figures below summarise the income and expenditure for the year as well as the assets and liabilities
as at 31 March 2026. The fund does not represent assets of the Council and has not been included within the Balance
Sheet on page 32. 
Common Good Income and Expenditure Account for the year ended 31 March 2026
Usable
Reserves
Unusable
Reserves
Usable
Reserves
Unusable
Reserves
Revenue
Revaluation
Reserve Total Revenue
Revaluation
Reserve Total
£'000 £'000 £'000 £'000 £'000 £'000
522                   522         Gross Expenditure 411,032       411,032       
(322)                  (322)        Gross Income (310,057)      (310,057)      
200                   200         Cost of Service 100,975       100,975       
Interest Payable and Similar Charges
(7)                      (7)            Interest and Investment Income (10,356)        (10,356)        
(7)                      (7)            Financing and Investment Income and Expenditure (10,356)        (10,356)        
193                   193         (Surplus) or Deficit on Provision of Services 90,619         90,619         
Other Income and Expenditure
-                    (367)                    (367)        Unrealised gains on revaluation of land and buildings -                -                         -               
193                   (367)                    (174)        (Surplus)/Deficit for the Year 90,619         -                         90,619         
(432)                  (3,854)                 (4,286)    Balance on Reserves brought forward (368,582)      (3,854,000)            (4,222,582)  
(239)                  (4,221)                 (4,460)    Balance on reserves carried forward (277,963)      (3,854,000)            (4,131,963)  
2024/25 2025/26
Common Good Balance Sheet as at 31 March 2026
31 March 2025 31 March 2026
£'000 £'000
Non-current Assets
3,854 Investment properties 3,854
Current Assets
393 Investments – West Dunbartonshire Council 229
0 Debtors 0
Current Liabilities
(25) Creditors falling due within one year 48
4,222 Total assets 4,131
Funds
368 General Fund 277
3,854 Capital Adjustment Account 3,854
4,222 Total Funds 4,131 
Note to the Common Good
Note 1 Property, Plant and Equipment
2024-25 2025-26
£'000 £'000
Cost or Valuation
At 1 April 3,854                  3,854                           
Disposals in year -                      -                               
Revaluation Adjustments -                      -                               
Other reclassifications -                      -                               
At 31 March 3,854               3,854                      
Other Land and Buildings

Page 92

Page 90
Trust Funds                                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official
Trust Funds
The Council acts as sole or custodian trustee for a number of trust funds, which may be used for various purposes
depending on the terms of the Trust. In all cases, the funds do not represent assets of the Council and they have not
been included within the Balance Sheet on page 32. Under the provisions of the “2005 Act” and the “Accounts
Regulations” above, all registered charities in Scotland are required to prepare financial statements which must be
externally scrutinised. The trust funds below are registered, under one registration, with the Office of the Scottish Charity
Regulator. Management has reviewed the current arrangements for the trust funds to ensure the current arrangements
reflect the needs of the Council and ensure that all obligations are met. Responsibility for the compliance with the new
regulations was delegated to the Chief Officer - Resources. 
Receipt and Payment Account
(Surplus)/ (Surplus)/
Receipts Payments Deficit ReceiptsPayments Deficit
£'000 £'000 £'000 £'000 £'000 £'000
(5) 6 1 Dunbartonshire Educational Trust Scheme 1962 (3) 15 12
0 Endowments amalgamated to form trust
(1) 0 (1) McAuley Prize for Mathematics (1) 0 (1)
0 Provide prizes for those studying maths & computing
(3) 6 3 Alexander Cameron Bequest (7) 1 (6)
0 To encourage and support one-off community activities in Clydebank
(1) 0 (1) UIE Award (1) 0 (1)
For students studying apprenticeships or training in industry
(10) 12 2 Total (12) 16 4
2024/25 2025/26
Statement of Balances as at 31 March 2026
01 April 2025 (Surplus)/deficit
for year 31 March 2026
Bank and Cash £'000 £'000 £'000
Dunbartonshire Educational Trust Scheme 1962 (96) 12 (84)
McAuley Prize for Mathematics (24) (1) (25)
Alexander Cameron Bequest (119) (6) (125)
UIE Award (27) (1) (28)
Total (266) 4 (262)

Page 93

Page 91
Group Comprehensive Income and Expenditure Statement                         
West Dunbartonshire Council Annual Accounts 2025/26
Official
Group Comprehensive Income and Expenditure Statement 
This statement shows the accounting cost in year, of providing services in accordance with relevant International Financial Reporting Standards,
rather than the amount to be funded from taxation. The council raises taxation to cover expenditure in accordance with regulations; this may be different from the accounting
cost. The taxation position is shown in the Movement in Reserves Statement.  
2024/25 2024/25 2024/25 2024/25 2024/25 2024/25
Gross Gross Net Gross Gross Net
Expenditure Income Expenditure Expenditure Income Expenditure
£'000 £'000 £'000 £'000 £'000 £'000
Service
40,830 (35,434) 5,396 Resources 34,466 (28,441) 6,025
10,546 (1,414) 9,132 Regulatory and Regeneration 11,562 (1,685) 9,877
12,560 (36) 12,524 People & Technology 12,290 30 12,320
15,806 (54) 15,752 Citizens, Culture and Facilities 22,280 (453) 21,827
140,952 (9,987) 130,965 Education, Learning and Attainment 144,830 (8,776) 136,054
29,930 (3,730) 26,200 Roads and Neighbourhood 33,551 (7,441) 26,110
14,454 (9,190) 5,264 Housing and Employability 7,683 (6,956) 727
5,907 (11,493) (5,586) Miscellaneous Services 14,942 (20,135) (5,193)
220,989 (125,238) 95,751 Health and Social Care Partnership 233,540 (134,932) 98,608
2,406 0 2,406 Requisitions 2,477 0 2,477
41,960 (53,019) (11,059) Housing Revenue Account 67,853 (61,991) 5,862
11280 (5,068) 6,212 Subsidiaries 11,256 (10,106) 1,150
547,620 (254,663) 292,957 Net Cost of Service 596,730 (280,886) 315,844
2,100
Other Operating Expenditure and (income) - (Gain) / loss on Disposal of non-
current assets 8,229
44,258 Financing and Investment (Income) and Expenditure (Note 5) 41,285
(312,167) Taxation and Non-specific Grant Income (Note 6) (350,927)
27,148 (Surplus)/Deficit on Provision of Services 14,431
278
Share of other Comprehensive Income and Expenditure of Associates and
joint Ventures (2,394)
(8,530) (Surplus)/Deficit arising from revaluation of non-current assets 44
0 (Surplus)/Deficit on revaluation of assets held at fair value through other
comprehensive income
33,776
(20,840) Remeasurement of the net defined benefit pension liability (10,468)
(29,092) Other Comprehensive (Income) and Expenditure 20,958
(1,944) Total Comprehensive (Income) and Expenditure 35,389

Page 94

Page 92
Group Balance Sheet                                               
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Group Balance Sheet
The balance sheet shows the value, as at the balance sheet date, of the assets and liabilities recognised by the group.
The net assets (assets less liabilities) are matched by the reserves held. Reserves are reported in two categories
(Note 24 Other Reserves provides a further explanation). 
31 March 2025 31 March 2025
£'000 Note £'000
1,278,157 Property, Plant and Equipment 16 1,272,113
2,128 Right of Use Assets 1,936
7,139 Investment Properties 3,329
1,264 Intangible Assets 17 1,109
2,022 Long Term Debtors 2,614
1,524 Heritage Assets 19 1,524
197 Long Term Investments 198
9,382 Investment in Associates & Joint Ventures 11,831
1,301,814 Long Term Assets 1,294,654
1,042 Asset Held for Sale 18 5,332
1,196 Inventories 1,384
67,358 Short Term Debtors 23 77,011
9,098 Cash and Cash Equivalents (net) 26 29,670
78,694 Current Assets 113,397
(61,698) Short Term Creditors 28 (62,938)
(650) Provisions (618)
(4,346) PPP 22 (4,740)
(252) Short-term lease creditor ROU Asset (223)
(334,350) Short Term Borrowing 27 (348,607)
(401,296) Current Liabilities (417,126)
(78,508) PPP and Finance Lease Liabilities 22 (73,768)
(467,240) Long Term Borrowing 27 (521,476)
(1,927) Long-term lease Creditor ROU Asset (1,803)
(37,416) Net Pensions Liability 13 (37,020)
(8,328) Capital Grants Receipts in Advance 10 (5,801)
(1,297) Liabilities in associates (1,910)
(594,716) Long Term Liabilities (641,778)
384,496 Net Assets 349,147
Represented by:
(24,185) Usable Reserves MIR/30 (39,791)
(360,311) Unusable Reserves MIR/31 (309,356)
(384,496) Total Reserves (349,147)
The unaudited annual accounts were issued on 17 June 2026
Laurence Slavin 
Chief Officer – Resources
Date: 17 June 2026

Page 95

Page 93
Group Movement in Reserves Statement                                                                                                     
West Dunbartonshire Council Annual Accounts 2025/26
Official
Group Movement in Reserves Statement
This statement shows the movement in the year on the different reserves held by the group, analysed into ‘usable reserves’ (i.e. those that can be applied to fund expenditure
or reduce local taxation) and other reserves. The surplus or (deficit) on the provision of services line shows the true economic cost of providing the group’s services, more
details of which are shown in the Comprehensive Income and Expenditure Statement. These are different from the statutory amounts required to be charged to the General
Fund balance and the Housing Revenue Account for council tax setting and dwelling rent setting purposes. The net increase/decrease before transfer to earmarked reserves
line shows the statutory general fund balance and housing revenue account balance before any discretionary transfers to or from earmarked reserves undertaken by the Council.
General
Fund
balance
HRA
Balance
Capital
Grants and
Receipts
Unapplied
Account
Capital
reserve
Capital
Fund
Other
Reserves
Total
Usable
Reserves
Council
Unusable
Reserves
Share of
Subsidiaries,
Associates &
Joint Ventures
Usable
Reserves
Share of
Subsidiaries,
Associates &
Joint Ventures
unusable
Reserves
Total Group
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
2025/26
Balance at 31 March 2025 Carried Forward (12,272) (611) 0 0 0 (242) (13,125) (353,928) (11,101) (6,383) (384,537)
Opening balance adjustment 0 0 0 0 0 41 0 41
Balance at 31 March 2025 Carried Forward (Revised) *(12,272) (611) 0 0 0 (242) (13,125) (353,928) (11,060) (6,383) (384,496)
Movement in Reserve 2025/26
Total Comprehensive Expenditure and Income 952 13,510 0 0 0 0 14,462 23,362 (2,435) 0 35,389
Adjustments between accounting basis and
funding basis under regulations (Note 6) (7,375) (14,021) 0 (278) (5,948) 0 (27,622) 27,622 (11) (29) (40)
Net (Increase)/Decrease before Transfers to
Other Statutory Reserves (6,423) (511) 0 (278) (5,948) 0 (13,160) 50,984 (2,446) (29) 35,349
Transfers to/(from) other statutory reserves (6,229) 0 0 278 5,948 3 0 0 0 0 0
Closing Balance at 31 March 2026 (24,924) (1,122) 0 0 0 (239) (26,285) (302,944) (13,506) (6,412) (349,147)
2024/25 0
Balance at 31 March 2024 Carried Forward (15,372) (970) (213) 0 0 (194) (16,749) (346,890) (12,553) (6,438) (382,630)
Opening balance adjustment 0 0 0 0 0 0 0 81 81
Opening Balance at 1 April 2024 (15,372) (970) (213) 0 0 (194) (16,749) (346,890) (12,553) (6,357) (382,549)
Movement in Reserve 2024/25
Total Comprehensive Expenditure and Income 27,568 (1,719) 0 0 0 0 25,849 (29,262) 1,526 0 (1,887)
Adjustments between accounting basis and
funding basis under regulations (Note 6) (23,051) 2,078 (1,252) 0 0 0 (22,225) 22,225 (33) (27) (60)
Net (Increase)/Decrease before Transfers to
Other Statutory Reserves 4,517 359 (1,252) 0 0 0 3,624 (7,037) 1,493 (27) (1,947)
Transfers to/(from) other statutory reserves (1,417) 0 1,465 (48) 0 0 0 0
Closing Balance at 31 March 2025 (12,272) (611) 0 0 0 (242) (13,125) (353,927) (11,060) (6,384) (384,496)
Council Usable Reserves

Page 96

Page 94
Group Cash Flow Statement                                   
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Group Cash Flow Statement
The cash flow statement shows the changes in cash and cash equivalents of the group during the reporting period. The
statement shows how the group generates and uses cash and cash equivalents by classifying cash flows as operating,
investing and financing activities. The amount of net cash flows arising from operating activities is a key indicator of the
extent to which the operations of the authority are funded by way of taxation and grant income or from the recipients of
services provided by the authority. Investing activities represent the extent to which cash outflows have been made for
resources which are intended to contribute to the Council’s future service delivery. Cash flows arising from financing
activities are useful in predicting claims on future cash flows by providers of capital (i.e. borrowing) to the group. 
2024/25 Cash Flow Statement 2025/26 2025/26
£'000 £'000 £'000
Operating Activities
27,149 Net deficit on the provision of services 14,431
(36,511) Depreciation, amortisation and impairment (61,142)
(2,305) Net gain/loss on fixed assets (8,229)
(15,156) Movement in pension liabilities (10,018)
(133) Movement in inventories 188
(6,239) Movement in debtors 9,728
1,707 Movement in creditors and provisions 1,907
0 Other non-cash movements 0
(58,637)
Adjustments to net deficit on the provision of services for non-
cash movements (67,566)
0 Financing movements 0
21,214 Investing movements 41,600
21,214
Adjustments for items included in the net surplus/deficit on the
provision of services that are investing and financing activities 41,600
(10,274) Net cash inflow from Operating Activities (11,535)
120,375 Purchase of property, plant and equipment and intangible assets 97,392
(1,252) Proceeds from sale of property, plant and equipment and intangible assets (278)
(13) Movement on long term investments 1
(21,249) Other receipts from investing activities (41,686)
0 Group Investment Transactions 0
97,861 Net cash outflows from investing activities 55,429
(453,663) Cash receipts of short-term and long-term borrowing (522,557)
257 Movement in IFRS 16 lease liability 273
3,590 Repayment of PPP liabilities 4,346
380,452 Repayment of short-term and long-term borrowing 453,472
(69,364) Financing Activities (64,466)
18,223 Net cash (inflow)/outflow from financing activities (20,572)
27,321 Cash and cash equivalents at the beginning of the reporting period 9,098
9,098 Cash and cash equivalents at the end of the reporting period 29,670
18,223 Movement – (Increase)/ Decrease in Cash (20,572)
Reconciliation of Liabilities arising from Financing Activities
31 March 2025
Financing
Cash flows
Other non-
cash adj
Non-cash adj
to FIAA 31 March 2026
£'000 £'000 £'000 £'000 £'000
Long term Borrowing 467,240 54,236 0 0 521,476
Short term Borrowing 334,350 14,037 0 220 348,607
PPP Liability 82,854 (4,346) 0 0 78,508
ROU Asset Lease Liability 2,179 (273) 120 0 2,026
886,623           63,654             120 220 950,617

Page 97

Page 95
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 31 - Details of Combining Entities
The notes required for the Financial Statements of the Council are disclosed separately in the preceding pages. 
Associates and Joint Ventures
Dunbartonshire and Argyll and Bute Valuation Joint Board was formed in 1996 at local government re-organisation
by an Act of Parliament. The Board maintains the electoral, council tax and non-domestic rates registers for the three
councils of West Dunbartonshire, East Dunbartonshire and Argyll and Bute. The Board’s running costs are met by the
three authorities, with surpluses and deficits on the Board’s operations also shared between the councils. In 2025/26,
the Council contributed £0.827m (2024/25 £0.781m) or 28.05% of the Board’s estimated running costs and its share of
the year end net asset of £0.172m (2024/25 £0.178m) is included in the Group Balance Sheet. Copies of its accounts
may be obtained from the Treasurer to the Valuation Joint Board, 16 Church Street, Dumbarton G82 1QL. 
The West Dunbartonshire Health & Social Care Partnership - the Public Bodies (Joint Working) Act (Scotland) 2014
sets out the arrangements for the integration of health and social care across the country. The Scottish Government
approved the Integration Scheme for West Dunbartonshire which details the ‘body corporate’ arrangement by which
NHS Greater Glasgow & Clyde Health Board and the Council agreed to formally delegate health and social care services
for adults and children (including criminal justice, social work services) to a third body, which is described in the Act as
an Integration Joint Board. The Integration Joint Board for West Dunbartonshire is known as the West Dunbartonshire
Health & Social Care Partnership Board (HSCP Board) and started operations on 1 July 2015. The Board’s running
costs are met by the two bodies mentioned above, with surpluses and deficits on the Boards operations also shared
between them. In 2025/26, the Council contributed £94.103m (2024/25 £89.830m) towards estimated running costs and
its share of the year end net asset of £11.658m (2024/25 £9.204m) is included in the Group Balance Sheet. Copies of
its accounts may be obtained from the Chief Financial Officer to the Integration Joint Board, 16 Church Street,
Dumbarton G82 1QL. 
The Council’s share of its associates and joint ventures are as follows:
Dunbartonshires and
Argyll and Bute
Valuation Joint Board
West Dunbartonshire
Health & Social Care Total
£'000 £'000 £'000
2025/26
Surplus/ (Deficit) on   Operating Activities (60) 2,454 2,394
Non Current Assets 109 0 109
Current Assets 136 11,931 12,067
Non Current Liabilities (43) 0 (43)
Current Liabilities (28) (273) (301)
2024/25
Surplus/ (Deficit) on   Operating Activities (154) (124) (278)
Non Current Assets 112 0 112
Current Assets 157 9,495 9,652
Non Current Liabilities (43) 0 (43)
Current Liabilities (48) (291) (339) 
Subsidiaries
West Dunbartonshire Leisure Trust was formed in December 2011 and started trading on 5 April 2012. The Trust is a
charitable company registered in Scotland and provides leisure facilities within the West Dunbartonshire area to the
general public and operates sports centres, leisure centres, swimming pools, halls and community education centres
owned by the Council. The Trust is paid a management fee by the Council for the provision of these services. The
Trust’s net asset at 31 March 2026 was £2.790m (2024/25 £2.172m net asset) and its surplus for the year was £0.617m
(2024/25 deficit £0.417m). The accounts of the Trust are published separately and can be obtained from the Manager,

Page 98

Page 96
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Leisure Trust Headquarters, Alexandria CE Centre, Alexandria, G83 0NU which is also the company’s principal place
of business. 
Clydebank Property Company was part of a group organisation previously known as Clydebank Rebuilt which was a
pathfinder urban regeneration organisation, limited by guarantee and included a commercial letting company (industrial
units) and a registered charity (the Titan Trust). On 11 August 2014, following the transfer of the Titan Crane to the
Property Company, the Council bought the commercial letting company with a view to continuing its regeneration
objective. The Company’s net asset at 31 March 2026 was £2.676m (2024/25 £2.883m) and its loss for the year before
payment of a dividend was £0.157m (2024/25 £0.059m). The accounts of the Company are published separately and
can be obtained from the Company’s Headquarters, Titan Enterprise, 1 Aurora Avenue, Queen’s Quay, Clydebank G81
1BF which is also the Company’s principal place of business. 
West Dunbartonshire Energy Limited Liability Partnership is a company established in April 2021 and was Scotland’s
first large-scale water source heat pump district heating scheme. The ESCo is a Limited Liability Partnership (LLP)
structure and is 99.9% controlled by WDC, with 0.1% being owned by Clydebank Property Company. The Company
has a net liability at 31 March 2026 of £1.771m (2024/25: £0.521m) funded as working capital advance from the Council.
Its deficit for the year was £0.289m (2024/25: £0.557m). The accounts of the Company are published separately and
can be obtained from the Company’s Headquarters, 16 Church Street, Dumbarton G82 1QE. 
Dumbarton Common Good is held in Trust by the Council. Although the council does not contribute to this fund
financially, it has been included within the Council’s Group through materiality by nature. Net usable spend in 2025/26
was £0.277m (2024/25 £0.193m net usable spend). 
Trust Funds are held in Trust by the Council. Although the Council does not contribute to these funds financially, they
have been included within the Council’s Group through materiality by nature. There was a net deficit in funds of £0.006m
(2024/25: net deficit of £0.002m) for the Trust Funds. For the purposes of the Group Accounts, two Trust Funds managed
by the Council (Dunbartonshire Educational Trust and McAulay Prize for Mathematics Trust) have been consolidated
based on the Council’s share of the assets. Copies of the accounts may be obtained from West Dunbartonshire Council,
16 Church Street, Dumbarton G82 1QL. 
The Council’s subsidiaries year end results are as follows:
West
Dunbartonshire
Leisure Trust
Clydebank
Property
Company
WD Energy
LLP
Common
Good
Trust
Funds Total
£'000 £'000 £'000 £'000 £'000 £'000
2025/26
Surplus/ (Deficit) on   Operating Activities 617 (202) (289) (91) (6) 29
Non Current Assets 611 3,579 0 3,854 0 8,044
Current Assets 3,929 225 920 229 262 5,565
Non Current Liabilities 0 (1,128) (2,597) 0 0 (3,725)
Current Liabilities (1,750) 0 (94) 48 0 (1,796)
2024/25
Surplus/ (Deficit) on   Operating Activities (417) (100) (557) (193) (1) (1,268)
Non Current Assets 629 3,538 0 3,854 0 8,021
Current Assets 3,161 343 629 393 267 4,793
Non Current Liabilities 0 (816) (2,004) 0 0 (2,820)
Current Liabilities (1,618) (182) (108) (25) 0 (1,933)

Page 99

Page 97
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2025/26
Official
Note 32 – Non-Material Interest in Other Entities
The Council has an interest in a number of other organisations. The Council’s share of their net assets or liabilities is
not material to the fair understanding of the financial position and transactions of the Council. Accordingly, the Group
Accounts do not include these organisations. Under Accounting Regulations, the Council is required to disclose the
business nature of each organisation. 
Strathclyde Partnership for Transport is the statutory body responsible for formulating the public transport policy on
behalf of the 12 local authorities in the West of Scotland. In 2025/26, the Council contributed £1.442m (2024/25
£1.421m). 
Strathclyde Concessionary Travel Scheme Joint Board oversees the operation of the concessionary fares scheme
for public transport on behalf of the 12 local authorities in the West of Scotland. The costs of the scheme are funded
through requisitions from the 12 councils and by the Scottish Executive via a ‘section 70’ grant. In 2025/26, the Council
contributed £0.169m (2024/25 £0.165m). 
Scotland Excel is a joint committee established through Section 57 of the Local Government (Scotland) Act 1973. The
main purpose of the committee includes co-ordination of collaborative buying initiatives, representation of interests in
public sector contracts, and the development and operation of a centre of procurement expertise for Local Government
in Scotland. 
Hub West of Scotland is a public private Joint Venture development organisation established in 2012. They work with
the public sector partners to plan, design, build, and fund and maintain buildings in the most efficient and effective
manner delivering better value for money and ultimately improving public services. Hub West of Scotland comprises:
Hub West Territory Participants, Scottish Futures Trust and The Wellspring Partnership. 
Business Loans Scotland Ltd was formed in March 2017 with 27 Scottish local authorities full members, including
the Council, and the remaining five Scottish local authorities becoming associate members. In this respect, each
member local council provides a level of loan finance for companies in their area under Phase 1, augmented in Phase
2 by Scottish Growth Scheme and European Regional Development Funding (ERDF). 
Note 33 – Financial Impact of Consolidation
The effect of inclusion of the entities on the Group Balance Sheet is to increase reserves and net assets by £19.918m
(2024/25 £17.696m) respectively representing the Council’s share of the realisable surpluses/deficits in these
organisations. The group account has an overall net asset of £349.147m (2024/25 £384.496m). 
Note 34 – Analysis of Material Items of Group Income and Expenditure 
The following table provides an analysis of the council’s share of the material amounts as a result of the inclusion of the
associates, joint ventures and subsidiaries. 
Contribution to Group Income and Expenditure Reserve: 
2024/25 2025/26
£'000 £'000
178 Valuation Joint Board 173
9,204 West Dunbartonshire Health & Social Care 11,658
2,172 West Dunbartonshire Leisure Trust 2,789
2,883 Clydebank Property Company 2,676
(1,442) WD Energy LLP (1,771)
4,222 Common Good 4,131
267 Trust Funds 262
17,484 Total 19,918

Page 100

Page 98
Notes to the Group’s Principal Financial Statements       
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Note 35 - Group Accounting Policies: Disclosure of differences with main
Statement of Accounting Policies
The financial statements in the Group Accounts are prepared in accordance with the accounting policies set out in Note
1 with additions and exceptions noted below: 
Group Income and Expenditure Account
Proceeds from disposal of fixed assets – profits and losses from the disposal of fixed assets are credited or debited to
the Group Income and Expenditure Account within the net cost of services. The proceeds are then appropriated out
after net operating expenditure. For those proceeds associated with the disposal of the Council’s assets, appropriation
is to the Group Reserves. For those proceeds associated with the disposal of associates’ assets, appropriation is to the
Group Income and Expenditure Reserve. 
Group Balance Sheet
Inventories – valuation methods vary slightly across the Group. The Council uses cost price basis. The difference in
valuation methods does not have a material impact on the results of the group given the levels of stock held within the
organisations; and 
Pensions – West Dunbartonshire Leisure Trust complies with the Financial Reporting Standard FRS102 concerning the
disclosure of information on pensions. There is no difference in the Profit and Loss Account by using this method in
comparison with IAS19 (which is used by other group entities) therefore there is no impact on the results of the group.

Page 101

Page 99
Independent Auditor’s Report 
West Dunbartonshire Council Annual Accounts 2025/26
Official 
Independent Auditor’s report to the Members of west Dunbartonshire council
and the Audit Commission 
Audit Arrangements
Under arrangements by the Accounts Commission for Local Authorities, the auditor with the responsibility for the audit
of the accounts of West Dunbartonshire Council is: 
Tom Reid
Director
Forvis Mazars
100 Queen Street
Glasgow
G1 3DN 
Statement
The audit of the Council’s Accounts for 2025-26 is yet to be undertaken i.e. the figures are “subject to audit”.  The
certified Accounts will be presented to the Council for approval.

Page 102

Page 100
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2025/26
Official
Accounting Period: The period of time
covered by the accounts, normally a period of
twelve months commencing on 1 April. The
end of the accounting period is the Balance
Sheet date.
Accruals: The concept that income and
expenditure are recognised as they are earned
or incurred, not as money is received or paid. 
Actuarial Gains and Losses (Pensions): For
a defined benefit scheme, the changes in
actuarial deficits or surpluses that arise
because events have not coincided with the
actuarial assumptions made for the last
valuation (experience gains and losses) or the
actuarial assumptions have changed. 
Asset: An item having value to the Council in
monetary terms. Assets are categorised as
either current or non-current. A current asset
will be consumed or cease to have material
value within the next financial year (e.g. cash
and stock). A non-current asset provides
benefit to the Council and to the Services it
provides for a period of more than one year. 
Associates: These are entities (other than a
subsidiary or a joint venture) in which the
Council has a participating interest or over
whose operating and financial policies the
Council is able to exercise significant influence. 
Audit of Accounts: An independent
examination of the Council’s financial affairs. 
Balance Sheet: A statement of the recorded
assets, liabilities and other balances at the end
of the accounting period. 
Capital Adjustment Account: This account
absorbs the timing differences arising from the
different arrangements for the consumption of
non-current assets and for financing the
acquisition, construction or enhancement of
those assets under statutory provisions. 
Capital Expenditure: Expenditure on the
acquisition of a non-current asset, which will be
used in providing services beyond the current
accounting period, or expenditure which adds
to and not merely maintains the value of an
existing non-current asset. 
Capital Financed from Current Revenue:
This is expenditure incurred in creating, acquiring or
improving assets where that expenditure is charged
directly to the revenue account.
Capital Financing: Funds raised to pay for
capital expenditure. There are various
methods of financing capital expenditure
including borrowing, leasing, capital receipts
and grants, and revenue funding. 
Capital Grants Unapplied Account: Holds
the grants and contributions received towards
capital projects for which the Council has met
the conditions that would otherwise require
repayment of the monies but which have yet to
be applied to meet expenditure. 
Capital Receipt: The proceeds from the
disposal of land or other non-current assets. 
CIES: The Comprehensive Income &
Expenditure Statement (CIES) shows the
accounting cost of providing services and
managing the Council during the year. It
includes, on an accruals basis, all of the
Council’s day-to-day expenses and related
income. It also includes transactions
measuring the value of non-current assets
actually consumed during the year and the real
projected value of retirement benefits earned
by employees during the year. The statement
shows the accounting cost in accordance with
generally accepted accounting practices,
rather than the cost according to the statutory
regulations that specify the net expenditure
that Councils need to take into account when
setting the annual Council Tax. The required
adjustments between accounting basis and
funding basis under regulations are shown in
the Movement in Reserves Statement. 
CIPFA: The Chartered Institute of Public
Finance and Accountancy (CIPFA) is one of
the major accountancy bodies in the United
Kingdom. It develops and sets accounting
standards for the public sector.

Page 103

Page 101
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2025/26
Official
The Code: The Code of Practice on Local
Authority Accounting in the United Kingdom
(The Code) is the basis on which local authority
accounts are prepared. The Code is based on
European Union adopted International
Financial Accounting Standards (that are
primarily drafted for the commercial sector) and
where required it interprets and adapts these
standards to address all the accounting issues
relevant to local government in the UK. 
Community Assets: Assets that the Council
intends to hold in perpetuity, that have no
determinable useful life and that may have
restrictions on their disposal. Examples of
community assets are municipal parks. 
Consistency: The concept that the accounting
treatment of like items within an accounting
period and from one period to the next, are the
same. 
Contingent Liability: A contingent liability is
either • A possible obligation arising from past
events whose existence will be confirmed only
by the occurrence of one or more uncertain
event, not wholly within the Council’s control;
or A present obligation arising from past events
where it is not probable that a transfer of
economic benefits will be required, or the
amount of the obligation cannot be measured
with sufficient reliability. 
Creditor: Amounts owed by the Council for
work done, goods received or services
rendered within the accounting period, but for
which payment has not been made by the end
of that accounting period. 
Current Service Cost (Pensions): The
increase in the present value of a defined
benefit scheme’s liabilities, expected to arise
from employee service in the current period. 
Debtor: Amount owed to the Council for works
done, goods received or services rendered
within the accounting period, but for which
payment has not been received by the end of
that accounting period.
Defined Benefit Pension Scheme: Pension
schemes in which the benefits received by the
participants are independent of the
contributions paid and are not directly related
to the investments of the scheme.
Depreciation: The measure of the cost of
wearing out, consumption or other reduction in
the useful economic life of the Council’s non-
current assets during the accounting period,
whether from use, the passage of time or
obsolescence through technical or other
changes. 
Discretionary Benefits (Pensions):
Retirement awards, which the employer has no
legal, contractual or constructive obligation to
award and are awarded under the Council’s
discretionary powers. 
Employee Statutory Adjustment Account:
The Employee Statutory Adjustment Account
absorbs the difference that would otherwise
arise on the General Fund from accruing for
compensated absences earned but not taken
in the year e.g. annual leave entitlement
carried forward at 31 March. 
Entity: A corporate body, partnership, trust,
unincorporated association, or statutory body
that is delivering a service or carrying on a
trade or business with or without a view to
profit. It should have a separate legal
personality and is legally required to prepare its
own single entity accounts. 
Equity: The Council’s value of total assets less
liabilities. 
Events after the Balance Sheet Date: Events
after the Balance Sheet date are those events,
favourable or unfavourable, that occur
between the Balance Sheet date and the date
when the Annual Accounts are authorised for
issue. 
Exceptional Items: Material items which
derive from events or transactions that fall
within the ordinary activities of the Council and
which need to be disclosed separately by virtue
of their size or incidence to give fair
presentation of the accounts.

Page 104

Page 102
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2025/26
Official
Fair Value: The fair value of an asset is the
price at which it could be exchanged for in an
arm’s length transaction, less where
applicable, any grants receivable towards the
purchase or use of the asset. 
Finance Lease: A lease that transfers
substantially all the risks and rewards of
ownership of a non-current asset to the lessee. 
Financial Instruments Adjustment Account:
The Financial Instruments Adjustment Account
absorbs the timing differences arising from the
different arrangements for accounting for the
income and expenses relating to certain
financial instruments, and for bearing losses or
benefitting from gains, per statutory provisions. 
General fund Balance: This contains the net
surplus on the provision of Council services
combined with balances from previous years
and any contributions from other funds made
during the year.
General Revenue Grant: A grant paid by the
Scottish Government to Councils, contributing
towards the general cost of their services. 
Going Concern: The concept that the Annual
Accounts are prepared on the assumption that
the Council (and its Associate bodies) will
continue in operational existence for the
foreseeable future. 
Government Grants: Grants made by the
Government towards either revenue or capital
expenditure in return for past or future
compliance with certain conditions relating to
the activities of the Council. These grants may
be specific to a particular scheme or may
support the revenue spend of the Council in
general. 
Gross Expenditure: This includes all
expenditure attributable to the service and
activity including employee costs, premises
and transport costs, supplies and services,
third party payments, support services and
depreciation
Gross Income: This includes grant income
and all charges to individuals and
organisations for the direct use of the Council’s
services. 
Heritage Asset: A tangible or intangible asset
with historical, artistic, scientific, technological,
geophysical or environmental qualities that is
held and maintained principally for its
contribution to knowledge and culture. 
IFRS: International Financial Reporting
Standards (IFRS) are a set of accounting
standards developed by the International
Accounting Standards Board (IASB) that is
becoming the global standard for the
preparation of public company financial
statements and has been extended into the
public sector in the UK. 43. Impairment A
reduction in the value of a non-current asset to
below its carrying amount on the Balance
Sheet. 
Infrastructure Assets: Non-current assets
belonging to the Council that cannot be
transferred or sold, on which expenditure is
only recoverable by the continued use of the
asset created. Examples are highways,
footpaths and bridges. 
Intangible Assets: An intangible (non-
physical) asset may be defined as such when
access to the future economic benefits it
represents are controlled by the Council. This
Council’s intangible assets are comprised
solely of computer software licenses. 
Interest Cost (Pensions): For a defined
benefit scheme, the expected increase during
the period of the scheme’s liabilities because
the benefits are one period closer to
settlement. 
Inventories: Items the Council has procured
and holds in expectation of future use.
Examples are consumable stores and raw
materials. 
Liability: A liability is where the Council owes
payment to an individual or another
organisation. A current liability is an amount
which will become payable or could be called
in within the next accounting period e.g.
creditors or cash overdrawn. A non-current

Page 105

Page 103
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2025/26
Official
liability is an amount which by arrangement is
payable beyond the next year, at some point in
the future, or is to be paid off by an annual sum
over a period of time. 
MiRS: The Movement in Reserves Statement
(MiRS) shows the movement in the year on the
different reserves held by the Council,
analysed into usable reserves (those reserves
that can be applied to fund expenditure or to
reduce taxation) and unusable reserves. 
National Non-Domestic Rates Pool: All Non-
Domestic Rates collected by local authorities
are remitted to the national pool and thereafter
distributed to Councils by the Scottish
Government. 
Net Carrying Value: The amount at which
non-current assets are included in the Balance
Sheet, i.e. their historical cost or current value
less the cumulative amounts provided for
depreciation. 
Non-current Assets: non-current Assets are
not expected to be realised within 12 months
and are held to provide future economic benefit
to the Council.
Operating Leases: A lease where the
ownership of the non-current asset remains
with the lessor.
Past Service Cost (Pensions): For a defined
benefit scheme, the increase in the present
value of the scheme’s liabilities relating to
employee service in prior periods arising in the
current period as a result of the introduction of,
or improvement to, retirement benefits. 
Pension Reserve: The Pension Reserve
recognises the Council’s share of the actuarial
gains and losses in the Strathclyde Pension
Fund and the change in the Council’s share of
the net liability chargeable to the CIES. 
Pension Scheme Liabilities: The liabilities of
a defined benefit pension scheme for
outgoings due after the valuation date. The
scheme’s liabilities, measured using the
“project unit method”, reflect the benefits that
the employer is committed to provide for
service up to the valuation date.
Post-Employment Benefits: All forms of
consideration given by an employer in
exchange for services rendered by employees
that are payable after the completion of
employment e.g. pensions in retirement
Prior Year Adjustment: Material adjustments
applicable to previous years arising from
changes in accounting policies or from the
correction of fundamental errors. This does not
include normal recurring corrections or
adjustments of accounting estimates made in
prior years. 
Provision: An amount put aside for future
liabilities or losses which are certain or very
likely to occur but the amounts or dates of
when they will arise are uncertain.
Public Works Loan Board (PWLB): A
Central Government Agency which provides
loans for one year and above to Councils at
interest rates based on those at which the
Government can borrow itself. 
Rateable Value: The annual assumed rental of
land or property, which is for national Non-
Domestic Rates purposes.
Related Parties: Bodies or individuals that
have the potential to control or influence the
Council or to be controlled or influenced by the
Council. For the Council’s purposes related
parties are deemed to include the Elected
Members, the Chief Executive and its
Corporate Directors. 
Remuneration: All sums paid to or receivable
by an employee and sums due by way of
expenses or allowances (as far as these sums
are chargeable to UK income tax) and the
monetary value of any other benefits received
other than in cash.
Reserves: The accumulation of surpluses,
deficits and appropriation over past years.
Reserves of a revenue nature are available
and can be spent or earmarked at the
discretion of the Council. Some capital

Page 106

Page 104
Glossary of Terms                                                     
West Dunbartonshire Council Annual Accounts 2025/26
Official
reserves such as the Revaluation Reserve
cannot be used to meet current expenditure. 
Residual Value: The net realisable value of an
asset at the end of its useful life. 
Revaluation Reserve: Records unrealised
gains arising since 1 April 2007 on the
revaluation of fixed assets not yet realised
through sales. 
Revenue Expenditure: The day-to-day
expenses of providing services. 
Short-term Borrowing: Money borrowed
where repayment is due in the following
financial year. 
Significant Interest: The reporting authority is
deemed to have Significant Interest if it is
actively involved and is influential in the
direction of an entity through its participation in
policy decisions. 
Unusable Reserves: Reserves which hold
unrealised gains and losses where amounts
would only become available to provide
services if the assets are sold and reserves
that hold a timing difference.
Usable reserves:  Those reserves which the
Council may use to provide services, subject to
the need to maintain a prudential level of
reserves and any statutory limitations on their
use.
Trust Funds: Funds administered by the
Council for such purposes as awards and
specific projects. Some of the Council’s Trust
Funds are Charities. 
Useful Economic Life: The period over which
the local authority will derive benefits from the
use of a non-current asset.

Page 107

Official