WEST DUNBARTONSHIRE COUNCIL 
Report by Planning, Building Standards and Environmental Health Manager 
Council: 17th June 2026
_____________________________________________________________ 
DC24/108/PPP:  Erection of residential-led (Class 8, Class 9 and sui generis) mixed
use development including Class 1A (Retail), Class 3 (Restaurants
and cafes), sui generis hot food takeaways/public houses, Class 4
(Office), Class 10 (Non-residential institutions) and Class 11
(Leisure) with associated outdoor space and public realm works,
access, landscaping, parking and infrastructure at Artizan Centre,
College Way, Dumbarton by West Dunbartonshire Council. 
1. REASON FOR REPORT 
1.1 This report relates to a planning application for a national development as the
application site sits within the Clyde Mission area as set out in National Planning
Framework 4. Under the terms of the approved Scheme of Delegation, it
therefore requires to be determined by Full Council. 
2 RECOMMENDATION 
2.1 That the Council approve the application subject to the conditions set out in
Section 9 of the report at Appendix 1. 
2.2 Note that should the Council determine to approve the application, subject to
conditions, the application will require to be notified to the Scottish Ministers
under The Town and Country Planning (Notification of Applications) (Scotland)
Direction 2009 as SEPA have objected in principle to the development. Any
granting of permission by the Planning Authority would also require Notification
under The Town and Country Planning (Notification of Applications) (10 or more
homes on non-allocated land) (Scotland) Direction 2025. 
3 BACKGROUND 
3.1  The application site is located primarily on land occupied by The Artizan
Shopping Centre and extends to approximately 2.8 ha. The site is bound by
High Street to the south, Risk Street to the west, car parks and Dumbarton
Bowling Club to the north and St Mary’s Way to the east. A small portion of the
south of the development site is located within the Dumbarton Town Centre
Conservation Area boundary, including the buildings fronting High Street and
the whole of the site is located within the Dumbarton Town Centre. 
3.2 The Council successfully gained Levelling Up Funding (now known as the Local
Regeneration Fund) as part of the Connecting Dumbarton project that also
included the adjacent Glencairn House project. At the time of submission, and
therefore reflected in the plans and drawings, College Way was lined with retail
Page 1
ITEM 8

Page 2

units which formed part of the wider Artizan Shopping Centre (which is an open
air centre rather than being enclosed), albeit the majority of these units were
vacant. Since the submission of the application, a number of these units have
been demolished with these parts of the site currently comprising vacant land.
These demolition works do not alone require planning permission. “Phase 1” of
the wider redevelopment of the site which comprises works to the existing
building to be retained inclusive of façade improvements to existing shopfronts
together with initial landscaping and associated infrastructure was separately
granted full planning permission under application DC24/081/FUL in November
2024. These works have commenced. 
3.3 This application is for Planning Permission in Principle for a mixed-use
development set out in a masterplan that seeks to redevelop the site and
partially repurpose the existing assets where possible, as set out in Sections
3.5 and 3.6 of the Committee Report at Appendix 1. The masterplan proposes
to create a new, high-quality, permeable public realm and is intended to contain
the following uses: 
• Residential
• Retail (at ground floor and key corners)
• Leisure/Food and Beverage
• Healthcare Facility. 
4 MAIN ISSUES 
4.1 A copy of the report presented to the Planning Committee is provided in
Appendix 1. Sections 6 and 7 of that report set out the planning policies and
other material considerations relevant to the application. The report concludes
that the development, despite an objection in principle from SEPA, draws strong
support from many Development Plan policies and falls within the Clyde
Mission National Development. The proposal will bring significant benefits to
the town centre in redeveloping underuse and vacant brownfield land whilst
fully acknowledging the concerns set out in SEPA’s objection. As SEPA are in
agreement with the applicants data and that all parties agree and understand
the technical data that underpins the flood risk, the report sets out that
considering the development plan as a whole and that as the flood risk arises
from coastal flooding, which can be forecast in advance, and that mitigation
measures can be designed into the development it can be considered to be
overall acceptable, despite being contrary to NPF4 Policy 22. 
4.2 As set out in section 4.1 SEPA have objected in principle, but have removed
their objection relating the understanding of flood risk, whilst section 4.2 sets
out that Council as Flood Authority have not objected to the development,
subject to conditions. A full assessment of flood matters is set out in sections
7.40 – 7.52 of the Committee Report. In terms of other consultees, no
objections were received from the Council’s Roads Service, Environmental
Health, HES, West of Scotland Archaeological Service, Scottish Water or the
council’s Biodiversity Officer. 1 public representation in support of the
application was received, and this is noted in section 5 of the report. 
Page 2

Page 3

4.3  Taking all matters into account, with the exception of Policy 22, it is considered
that the proposals, with conditions, accord with the provisions of NPF4, and the
adopted West Dunbartonshire Local Plan and proposed West Dunbartonshire
Local Development Plan 2. 
4.4 At the pre-determination hearing at Planning Committee a representative from
the applicants agents, Savils and the Flood Consultant, Kaya, were heard in
respect of the application. No other party opted to take part in the hearing.
Planning committee discussed concerns with officers regarding the
archaeological potential of the site and how this was to be manged. Officers
confirmed that the archaeological potential of the site is known and a written
scheme of investigation is required by condition 13 prior to any works taking
place. The condition further requires that the scheme of investigation, once
agreed, is carried out in full. 
4.5 After discussion the Planning Committee recommended that the application
be referred to the full Council for determination, expressing the provisional view
that the application should be approved with the conditions indicated within
Section 9 of the Planning Committee Report (Appendix 1). 
5. People Implications 
5.1 There are no personnel issues. 
6. Financial and Procurement Implications 
6.1 There are no financial or procurement implications. 
7. Risk Analysis 
7.1 No risks have been identified. 
8. Equalities Impact Assessment (EIA) 
8.1 There is no equalities impact. 
9. Environmental Sustainability 
9.1 A Strategic Environmental Assessment is not required. 
10. Consultation 
10.1 Publicity and consultation have been carried out in line with the requirements
of the planning regulations. 1 representation from a member of the public has
been received in support of the proposals and consultations received from West
Dunbartonshire Council Roads Service, West Dunbartonshire Council Roads
Service (Flooding), West Dunbartonshire Council Environmental Health, West
Dunbartonshire Council Biodiversity officer, Historic Environment Scotland,
Scottish Water, West of Scotland Archaeological Service and SEPA. These are
summarised in Section 4 and 5 of the Planning Committee report (Appendix 1).
Page 3

Page 4

11. Strategic Assessment 
11.1 The proposed development complies with the strategic priorities of the Council
in particular: 
• Our Communities Resilient and Thriving 
• Our Environment A Greener Future
• Our Economy Strong and Flourishing 
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager 
Date: 17th June 2026
___________________________________________________________________ 
Person to Contact: Michael Mulgrew, Planning & Building Standards
Manager  
Email: Michael.Mulgrew@west-dunbarton.gov.uk 
James McColl, Development Management Team Leader  
Email: James.McColl@west-dunbarton.gov.uk 
Appendices: Appendix 1 - Planning Committee Report: 3rd June –
DC24/108/PPP 
Background Papers: None 
Wards Affected:  Ward 3 (Dumbarton) 