Democracy Spraffa

Document Pack (Bookmarked)

West Dunbartonshire Council · 17 June 2026
Back to West Dunbartonshire Council — 17 June 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda 
West Dunbartonshire Council 
Date:  Wednesday, 17 June 2026
___________________________________________________________________ 
Time:  16:00
___________________________________________________________________ 
Format:      Hybrid meeting 
___________________________________________________________________ 
Contact:    Carol-Ann Burns, Senior Democratic Services Officer  
Email: carol-ann.burns@west-dunbarton.gov.uk   
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of West Dunbartonshire Council as detailed above.   
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton. 
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive 
Page 1

Page 2

Distribution:- 
Provost Karen Murray Conaghan Councillor June McKay
Councillor James Bollan  Councillor John Millar
Councillor Kevin Crawford Councillor Lawrence O’Neill
Councillor Ian Dickson Councillor Lauren Oxley
Councillor Diane Docherty Councillor Chris Pollock
Councillor Fiona Hennebry Councillor Martin Rooney
Councillor Gurpreet Singh Johal Councillor William Rooney
Councillor Daniel Lennie Councillor Gordon Scanlan
Councillor David McBride Councillor Hazel Sorrell
Councillor Jonathan McColl Councillor Clare Steel
Councillor Michelle McGinty Councillor Sophie Traynor   
Chief Executive
Chief Officers 
Date of issue: 4 June 2026 
Audio Streaming 
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and the
Council’s host’s webcast/audio stream platform. 
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including, but
not limited to, for the purpose of keeping historical records and making those records
available via the Council’s internet site. 
Page 2

Page 3

WEST DUNBARTONSHIRE COUNCIL 
WEDNESDAY, 17 JUNE 2026 
AGENDA 
1 STATEMENT BY CHAIR – AUDIO STREAMING 
The Chair will be heard in connection with the above. 
2 APOLOGIES 
3 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on the agenda and the reasons for such declarations. 
4 RECORDING OF VOTES 
The Council is asked to agree that all votes taken during the meeting will be
carried out by roll call vote to ensure an accurate record. 
5 OPEN FORUM    
The Council is asked to note that no open forum questions have been
submitted by members of the public. 
6 MINUTES OF PREVIOUS MEETING      9 – 11   
Submit, for approval as correct record, the Minutes of Meeting of   
West Dunbartonshire Council held on 29 April 2026. 
7 MINUTES OF MEETING OF AUDIT COMMITTEE    To Follow
Submit for information, and where necessary ratification, the Minutes of Meeting of
the Audit Committee held on 18 February 2026. 
8/ 
Page 3

Page 4

8 DC24/108/PPP: ERECTION OF RESIDENTIAL-LED       13 – 46 
(CLASS 8, CLASS 9 AND SUI GENERIS) MIXED USE 
DEVELOPMENT INCLUDING CLASS 1A (RETAIL), CLASS 3 
(RESTAURANTS AND CAFES), SUI GENERIS HOT FOOD 
TAKEAWAYS/PUBLIC HOUSES, CLASS 4 (OFFICE), CLASS 10 
(NON-RESIDENTIAL INSTITUTIONS) AND CLASS 11 (LEISURE) WITH
ASSOCIATED OUTDOOR SPACE AND PUBLIC REALM WORKS, 
ACCESS, LANDSCAPING, PARKING AND INFRASTRUCTURE AT 
ARTIZAN CENTRE, COLLEGE WAY, DUMBARTON BY 
WEST DUNBARTONSHIRE COUNCIL 
Submit report by the Chief Officer – Regulatory and Regeneration seeking
determination of a planning application for a national development, the site of
which sits within the Clyde Mission area as set out in National Planning
Framework 4, under the terms of the approved Scheme of Delegation, and
therefore requires to be determined by Full Council. 
9 FINANCIAL UPDATE           47 – 52 
Submit report by the Chief Officer – Resources providing an update on the
financial challenges facing the Council and the estimated 2027/28 to 2031/32
revenue budget gaps. 
10 UNAUDITED 2025/26 WEST DUNBARTONSHIRE     To Follow
COUNCIL AND COMMON GOOD AND TRUST ANNUAL ACCOUNTS 
Submit report by the Chief Officer – Resources providing a copy of the
unaudited 2025/26 West Dunbartonshire Council Annual Accounts and
information regarding the 2025/26 outturn as set out in the draft accounts. 
11 AUDITED 2024/25 WEST DUNBARTONSHIRE     To Follow
COUNCIL ANNUAL ACCOUNTS 
Submit report by the Chief Officer – Resources providing Members with the
opportunity to scrutinise and approve the 2024/25 Audited Annual Accounts
for West Dunbartonshire Council. 
12 2024/25 WEST DUNBARTONSHIRE COUNCIL     To Follow
ANNUAL AUDIT REPORT 
Submit report by the Chief Officer – Resources providing the 2024/25 Annual
Audit Report. 
13/
Page 4

Page 5

13   53 – 90  GENERAL SERVICES REVENUE BUDGETARY CONTROL
REPORT TO 31 MARCH 2026 (DRAFT OUTTURN) 
Submit report by the Chief Officer – Resources advising on the draft outturn
position of the 2025/26 Revenue Budget and the level of the General Fund
Reserve as at 31 March 2026. 
14    91 – 100 GENERAL SERVICES CAPITAL BUDGETARY CONTROL
REPORT 2025/26 TO 31 MARCH 2026 (DRAFT OUTTURN) 
Submit report by the Chief Officer – Resources providing the draft outturn on
the General Services capital financial performance to 31 March 2026. 
15 HOUSING REVENUE ACCOUNT OUTTURN FOR FINANCIAL  101 – 112 
YEAR 2025/2026 
Submit report by the Chief Officer – Resources advising of the Housing
Revenue Account outturn position for 2025/2026. 
16 HOUSING REVENUE ACCOUNT CAPITAL OUTTURN FOR  113 – 120
FINANCIAL YEAR 2025/2026 
Submit report by the Chief Officer – Resources advising of the Housing
Revenue Account capital outturn position for 2025/2026. 
17 CREMATORIUM          121 – 124 
Submit report by the Chief Officer – Roads and Neighbourhood providing the
information requested in the amendment agreed at the Infrastructure,
Regeneration and Economic Development Committee meeting on 20 May 
2026 in relation to weekend access to the Hall of Remembrance. 
18 VACANCIES ON COUNCIL COMMITTEES     125 – 129 
Submit report by the Chief Officer – Regulatory and Regeneration requesting
the Council fills the current list of vacancies on council committees, working
groups, joint boards and outside bodies. 
19/ 
Page 5

Page 6

19 NOTICE OF MOTIONS 
(a) Motion by Councillor William Rooney – 10 years of Clydebank
Men’s Shed 
Clydebank Men’s Shed will celebrate its tenth anniversary with an
open day on the 5th of August 2026.  
The Men’s Shed was established in 2016, and is marking ten years
of supporting men in Clydebank and beyond. 
Clydebank Men’s Sheds plays an important role as community hub
where men connect through shared activities, foster solidarity, and
form lasting friendships. 
Over the last decade, it has been vital to help to tackle isolation and
support mental health and wellbeing. 
Council agrees to recognise and promote the positive impact
Clydebank Men's Shed has had on men’s health and wellbeing over
the past ten years, and we recognise the work of all those involved
and wish them continued success over the coming years. 
(b) Motion by Councillor Hazel Sorrell – Marking Twenty Years of
Haldane Youth Services 
Haldane Youth Services is a registered charity providing afterschool
activities and youth provision for children and young people aged 4–
24 in West Dunbartonshire. 
This year the group will celebrate two decades of dedicated service
to children, young people, families, and the wider community across
West Dunbartonshire.  
Haldane Youth Services aim is to make a positive and lasting
difference to the lives of young people and their families by:
• Raising aspirations and broadening horizons.
• Encouraging confidence and increasing self-esteem.
• Giving young people a voice within their community.
• Rewarding commitment and positive social interaction.
• Supporting young people to make healthy lifestyle choices.  
The group also work closely with local primary and secondary
schools to ensure our support is accessible, familiar, and rooted in
the community. 
Page 6

Page 7

Since opening in 2006, Haldane Youth Service has grown from a
small volunteer-led project into a trusted community organisation
delivering high-quality programmes that promote wellbeing,
confidence, leadership, and positive futures.  
The Council notes that Haldane Youth Services is celebrating its 20th
Anniversary, on Saturday 27th June at the Annex Building Old
Jamestown Primary, Main Street, Jamestown. 
Finally, this Council thanks all the staff and the volunteers - past and
present - for all they have done over the past twenty years to help
make Haldane Youth Services such a great success. 
20 DATE OF NEXT MEETING 
Members are requested to note that the next ordinary meeting of West
Dunbartonshire Council is scheduled to be held on Wednesday, 26 August
2026 at 4.00 p.m. 
Page 7

Page 8

Page 8

Page 9

WEST DUNBARTONSHIRE COUNCIL 
At a Hybrid Meeting of West Dunbartonshire Council held in the Civic Space, 16
Church Street, Dumbarton on Wednesday, 29 April 2026 at 4.03 p.m. 
Present:   Provost Karen Murray Conaghan, and Councillors Jim Bollan,
Kevin Crawford, Ian Dickson, Diane Docherty, Fiona Hennebry,
Gurpreet Singh Johal, Daniel Lennie, David McBride, Jonathan
McColl, Michelle McGinty, June McKay, John Millar, Lawrence
O’Neill, Lauren Oxley, Chris Pollock, Martin Rooney, William
Rooney, Gordon Scanlan and Hazel Sorrell. 
Attending: Peter Hessett, Chief Executive; Laurence Slavin, Chief Officer –
Resources, and Section 95 Officer; Alan Douglas, Chief Officer
– Regulatory and Regeneration (Legal Officer); Amanda
Graham, Chief Officer – Citizen, Culture and Facilities; Victoria
Rogers, Chief Officer – People and Technology; Peter Barry,
Chief Officer – Housing Services; Gail Macfarlane, Chief Officer
– Roads and Neighbourhood; Gillian Hamilton, Chief Officer –
Education; Michelle Lynn, Asset Manager; Graeme Forrester,
Manager of Democratic and Registration Services; and Carol-
Ann Burns, Senior Democratic Services Officer. 
Apologies: Apologies for absence were intimated on behalf of Councillors
Clare Steel and Sophie Traynor 
Provost Karen Murray Conaghan in the Chair 
STATEMENT BY CHAIR – AUDIO STREAMING 
Provost Murray Conaghan advised that the meeting was being audio streamed and
broadcast live to the internet and would be available for playback. 
MINUTE OF SILENCE 
At the request of Councillor O’Neill the Council observed a minute of silence as a
mark of respect for Tony Worthington, the former Member of Parliament for
Clydebank and Milngavie from 1987 to 2005 and Strathclyde Regional Councillor
from 1974 to 1987, who had sadly passed away recently. 
ITEM 6
Page 9

Page 10

Councillor O’Neill paid tribute to Mr Worthington’s work on asbestosis, his support for
the Queens Quay development, and the difference he made to many people across
West Dunbartonshire, particularly in Clydebank.  On behalf of the Council, Provost
Murray Conaghan extended sympathies to Mr Worthington’s family for their loss. 
Note: Councillor McColl entered the meeting at this point. 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
RECORDING OF VOTES 
The Council agreed that all votes taken during the meeting would be carried out by
roll call vote to ensure an accurate record. 
OPEN FORUM 
The Council noted that no open forum questions had been submitted by members of
the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of West Dunbartonshire Council held on 25 March 2026
were submitted and approved as a correct record. 
STATUS UPDATE ON REVIEW OF SCHEME FOR ESTABLISHMENT OF
COMMUNITY COUNCILS 
A report was submitted by the Chief Officer – Regulatory and Regeneration providing
an update on the progress of the review of the Scheme for Establishment of
Community Councils, as agreed by Council on 17 December 2025. 
After discussion, the Committee agreed to note the status update on the review of
the Scheme for the Establishment of Community Councils. 
GLASGOW CITY REGION CITY DEAL – UPDATE 
A report was submitted by the Chief Officer – Regulatory and Regeneration providing
an update on the Exxon Infrastructure Project, and reporting on matters being
discussed by Glasgow City Region. 
Page 10

Page 11

Having heard the Asset Manager, the Chief Officer – Regulatory and Regeneration,
and the Chief Officer – Resources, in answer to a Member’s questions, Councillor
McBride moved:- 
That the Council agrees:- 
(1) to note the update on the Exxon Infrastructure Project; 
(2) to continue to include the Eastern Access Road in the scope of the 
Project; and 
(3) to note the update and progress of the Glasgow City Region    
programme. 
As an amendment, Councillor Bollan moved:- 
That the Council agrees: 
(1) to note the update on the Exxon Infrastructure Project; 
(2) to approve the request to remove the Eastern Access Road; and 
(3) to note the update and progress of the Glasgow City Region    
programme. 
Councillor Dickson then seconded Councillor McBride’s motion and Councillor
Lennie seconded Councillor Bollan’s amendment. 
On a roll call vote being taken between the amendment (Councillor Bollan) and
the motion (Councillor McBride), 3 Members voted for the amendment, namely
Councillors Bollan, Lennie and McKay, and 17 Members voted for the motion,
namely Provost Murray Conaghan and Councillors Crawford, Dickson, Docherty,
Hennebry, Singh Johal, McBride, McColl, McGinty, Millar, O’Neill, Oxley, Pollock,
Martin Rooney, William Rooney, Scanlan and Sorrell.  The motion was
accordingly declared carried. 
NOTICE OF MOTIONS 
The Council noted that no motions had been submitted by Members. 
DATE OF NEXT MEETING 
Members noted that the next ordinary meeting of West Dunbartonshire Council was
scheduled to be held on Wednesday, 17 June 2026 at 4.00 p.m. 
The meeting closed at 4.21 p.m.
Page 11

Page 12

Page 12

Page 13

WEST DUNBARTONSHIRE COUNCIL 
Report by Planning, Building Standards and Environmental Health Manager 
Council: 17th June 2026
_____________________________________________________________ 
DC24/108/PPP:  Erection of residential-led (Class 8, Class 9 and sui generis) mixed
use development including Class 1A (Retail), Class 3 (Restaurants
and cafes), sui generis hot food takeaways/public houses, Class 4
(Office), Class 10 (Non-residential institutions) and Class 11
(Leisure) with associated outdoor space and public realm works,
access, landscaping, parking and infrastructure at Artizan Centre,
College Way, Dumbarton by West Dunbartonshire Council. 
1. REASON FOR REPORT 
1.1 This report relates to a planning application for a national development as the
application site sits within the Clyde Mission area as set out in National Planning
Framework 4. Under the terms of the approved Scheme of Delegation, it
therefore requires to be determined by Full Council. 
2 RECOMMENDATION 
2.1 That the Council approve the application subject to the conditions set out in
Section 9 of the report at Appendix 1. 
2.2 Note that should the Council determine to approve the application, subject to
conditions, the application will require to be notified to the Scottish Ministers
under The Town and Country Planning (Notification of Applications) (Scotland)
Direction 2009 as SEPA have objected in principle to the development. Any
granting of permission by the Planning Authority would also require Notification
under The Town and Country Planning (Notification of Applications) (10 or more
homes on non-allocated land) (Scotland) Direction 2025. 
3 BACKGROUND 
3.1  The application site is located primarily on land occupied by The Artizan
Shopping Centre and extends to approximately 2.8 ha. The site is bound by
High Street to the south, Risk Street to the west, car parks and Dumbarton
Bowling Club to the north and St Mary’s Way to the east. A small portion of the
south of the development site is located within the Dumbarton Town Centre
Conservation Area boundary, including the buildings fronting High Street and
the whole of the site is located within the Dumbarton Town Centre. 
3.2 The Council successfully gained Levelling Up Funding (now known as the Local
Regeneration Fund) as part of the Connecting Dumbarton project that also
included the adjacent Glencairn House project. At the time of submission, and
therefore reflected in the plans and drawings, College Way was lined with retail
ITEM 8
Page 13

Page 14

units which formed part of the wider Artizan Shopping Centre (which is an open
air centre rather than being enclosed), albeit the majority of these units were
vacant. Since the submission of the application, a number of these units have
been demolished with these parts of the site currently comprising vacant land.
These demolition works do not alone require planning permission. “Phase 1” of
the wider redevelopment of the site which comprises works to the existing
building to be retained inclusive of façade improvements to existing shopfronts
together with initial landscaping and associated infrastructure was separately
granted full planning permission under application DC24/081/FUL in November
2024. These works have commenced. 
3.3 This application is for Planning Permission in Principle for a mixed-use
development set out in a masterplan that seeks to redevelop the site and
partially repurpose the existing assets where possible, as set out in Sections
3.5 and 3.6 of the Committee Report at Appendix 1. The masterplan proposes
to create a new, high-quality, permeable public realm and is intended to contain
the following uses: 
• Residential
• Retail (at ground floor and key corners)
• Leisure/Food and Beverage
• Healthcare Facility. 
4 MAIN ISSUES 
4.1 A copy of the report presented to the Planning Committee is provided in
Appendix 1. Sections 6 and 7 of that report set out the planning policies and
other material considerations relevant to the application. The report concludes
that the development, despite an objection in principle from SEPA, draws strong
support from many Development Plan policies and falls within the Clyde
Mission National Development. The proposal will bring significant benefits to
the town centre in redeveloping underuse and vacant brownfield land whilst
fully acknowledging the concerns set out in SEPA’s objection. As SEPA are in
agreement with the applicants data and that all parties agree and understand
the technical data that underpins the flood risk, the report sets out that
considering the development plan as a whole and that as the flood risk arises
from coastal flooding, which can be forecast in advance, and that mitigation
measures can be designed into the development it can be considered to be
overall acceptable, despite being contrary to NPF4 Policy 22. 
4.2 As set out in section 4.1 SEPA have objected in principle, but have removed
their objection relating the understanding of flood risk, whilst section 4.2 sets
out that Council as Flood Authority have not objected to the development,
subject to conditions. A full assessment of flood matters is set out in sections
7.40 – 7.52 of the Committee Report. In terms of other consultees, no
objections were received from the Council’s Roads Service, Environmental
Health, HES, West of Scotland Archaeological Service, Scottish Water or the
council’s Biodiversity Officer. 1 public representation in support of the
application was received, and this is noted in section 5 of the report. 
Page 14

Page 15

4.3  Taking all matters into account, with the exception of Policy 22, it is considered
that the proposals, with conditions, accord with the provisions of NPF4, and the
adopted West Dunbartonshire Local Plan and proposed West Dunbartonshire
Local Development Plan 2. 
4.4 At the pre-determination hearing at Planning Committee a representative from
the applicants agents, Savils and the Flood Consultant, Kaya, were heard in
respect of the application. No other party opted to take part in the hearing.
Planning committee discussed concerns with officers regarding the
archaeological potential of the site and how this was to be manged. Officers
confirmed that the archaeological potential of the site is known and a written
scheme of investigation is required by condition 13 prior to any works taking
place. The condition further requires that the scheme of investigation, once
agreed, is carried out in full. 
4.5 After discussion the Planning Committee recommended that the application
be referred to the full Council for determination, expressing the provisional view
that the application should be approved with the conditions indicated within
Section 9 of the Planning Committee Report (Appendix 1). 
5. People Implications 
5.1 There are no personnel issues. 
6. Financial and Procurement Implications 
6.1 There are no financial or procurement implications. 
7. Risk Analysis 
7.1 No risks have been identified. 
8. Equalities Impact Assessment (EIA) 
8.1 There is no equalities impact. 
9. Environmental Sustainability 
9.1 A Strategic Environmental Assessment is not required. 
10. Consultation 
10.1 Publicity and consultation have been carried out in line with the requirements
of the planning regulations. 1 representation from a member of the public has
been received in support of the proposals and consultations received from West
Dunbartonshire Council Roads Service, West Dunbartonshire Council Roads
Service (Flooding), West Dunbartonshire Council Environmental Health, West
Dunbartonshire Council Biodiversity officer, Historic Environment Scotland,
Scottish Water, West of Scotland Archaeological Service and SEPA. These are
summarised in Section 4 and 5 of the Planning Committee report (Appendix 1).
Page 15

Page 16

11. Strategic Assessment 
11.1 The proposed development complies with the strategic priorities of the Council
in particular: 
• Our Communities Resilient and Thriving 
• Our Environment A Greener Future
• Our Economy Strong and Flourishing 
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager 
Date: 17th June 2026
___________________________________________________________________ 
Person to Contact: Michael Mulgrew, Planning & Building Standards
Manager  
Email: Michael.Mulgrew@west-dunbarton.gov.uk 
James McColl, Development Management Team Leader  
Email: James.McColl@west-dunbarton.gov.uk 
Appendices: Appendix 1 - Planning Committee Report: 3rd June –
DC24/108/PPP 
Background Papers: None 
Wards Affected:  Ward 3 (Dumbarton) 
Page 16

Page 17

WEST DUNBARTONSHIRE COUNCIL 
Report by Planning, Building Standards and Environmental Health Manager 
Planning Committee: 3rd June 2026 
DC24/108/PPP: Erection of residential-led (Class 8, Class 9 and sui generis)
mixed use development including Class 1A (Retail), Class 3
(Restaurants and cafes), sui generis hot food takeaways/public
houses, Class 4 (Office), Class 10 (Non-residential institutions)
and Class 11 (Leisure) with associated outdoor space and public
realm works, access, landscaping, parking and infrastructure at
Artizan Centre, College Way, Dumbarton by West Dunbartonshire
Council. 
1. REASON FOR REPORT 
1.1 The planning application is a national development as set out in the Schedule to the
Town and Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009 as the application site sits within the Clyde Mission area as set out in National
Planning Framework 4. Under the terms of the approved Scheme of Delegation, it
therefore requires to be considered by the Planning Committee before being
determined by the Council. 
2. RECOMMENDATION 
2.1 That the Planning Committee hears the applicant and those who have made
representations and refers the application to full Council for determination with a
preliminary recommendation, based on the information considered to date, that it be
approved, subject to the conditions in Section 9 below. 
2.2  Should the Council determine to approve the application, subject to conditions, the
application will require to be notified to the Scottish Ministers under The Town and
Country Planning (Notification of Applications) (Scotland) Direction 2009 as SEPA
have objected in principle to the development. Any granting of permission by the
Planning Authority would also require Notification under The Town and Country
Planning (Notification of Applications) (10 or more homes on non-allocated land)
(Scotland) Direction 2025. 
3. DEVELOPMENT DETAILS 
3.1  The application site is located primarily on land occupied by The Artizan Shopping
Centre and extends to approximately 2.8 ha. The site is bound by High Street to the
south, Risk Street to the west, car parks and Dumbarton Bowling Club to the north
and St Mary’s Way to the east. A small portion of the south of the development site is
located within the Dumbarton Town Centre Conservation Area boundary, including
the buildings fronting High Street and the whole of the site is located within the
Dumbarton Town Centre. 
3.2 At the time of submission, and therefore reflected in the plans and drawings, College
Way was lined with retail units which formed part of the wider Artizan Shopping
Centre (which is an open air centre rather than being enclosed), albeit the majority of 
APPENDIX 1
Page 17

Page 18

these units were vacant. Since the submission of the application, a number of these
units have been demolished with these parts of the site currently comprising vacant
land. These demolition works do not alone require planning permission. “Phase 1” of
the wider redevelopment of the site which comprises works to the existing building to
be retained inclusive of façade improvements to existing shopfronts together with
initial landscaping and associated infrastructure was separately granted full planning
permission under application DC24/081/FUL in November 2024. These works have
commenced.  
3.3 This application is for Planning Permission in Principle for a mixed-use development
set out in a masterplan that seeks to redevelop the site and partially repurpose the
existing assets where possible. The masterplan proposes to create a new, high-
quality, permeable public realm and is intended to contain the following uses: 
• Residential
• Retail (at ground floor and key corners)
• Leisure/Food and Beverage
• Healthcare Facility. 
3.4 It is proposed that Phases 2 and 3 of the redevelopment of the site will be located on
plots freed up the initial demolition works. Block A or Plot A as defined on the site
layout as proposed drawing is proposed as affordable homes, for later living. This is
located to the north of the site adjacent to Risk Street. The Design and Access
Statement suggests up to 40 homes within this part of the site. Block B or Plot B is
indicated as a four-storey Health Centre with circa 6000m2 of floor space. This is
located on the west side of College Way. 
3.5  Block/Plot C onwards is proposed within the Design and Access Statement as
“Longer term possibilities”. Block/Plot C is indicated to be a mix of one and two bed
flats and two storey  maisonettes for family living. Thirty of these units are suggested
and are to be located towards the north of the site on the east side of College Way.
Block D remains retail with refurbishment and repurposing, and is located on the
west side of College Way. Block E is proposed to be consolidated retail with the
introduction of 40 affordable housing units through new extensions. This block fronts
onto High Street and is on the east side of College Way. 
3.6 As the application is for Planning Permission in Principle, full details of design and
materials are not considered at this stage. However, an approach of utilising warm
tones and textures is indicated in the Design and Access Statement, and this would
be reflected in a palette of red, rust and light brown brick with feature elements like
balconies, railing and spandrel panels of metal finished in heritage tones. 
4. CONSULTATIONS 
4.1 Scottish Environment Protection Agency (SEPA)
SEPA object in principle to the application and recommend that planning permission
is refused. SEPA states that had this been a like-for-like redevelopment of a
commercial site, they would have no objection. However, the proposal introduces
dwellinghouses and a health centre both of which are “high vulnerability” to flooding.
The initial consultation noted that notwithstanding SEPA’s objection in principle, that
a number of technical aspects required to be covered within the Flood Risk
Assessment (FRA) in order to demonstrate that the flood risk of the site was fully
understood. 
Page 18

Page 19

Further information was provided and SEPA confirmed that the FRA met the
technical and reporting standards. Whilst the submission of the information does not
change the objection in principle, it enables an agreed understanding of the flood
hazard. 
4.2 West Dunbartonshire Council Roads Service (Flooding)
The site has been identified at risk of Coastal flooding on the SEPA Flood Maps. The
main factors contributing to coastal flooding within Dumbarton are the tide level, wind
speed and direction. Coastal flooding frequently happens within the area when the
tidal level is 3.6m and above with the wind direction coming from the southwest at
20mph, flooding Riverside Lane and the car parking area only. For it to reach the site
it would need to be significantly higher in tide level and wind speed. There has been
one historic flooding event recorded affecting Dumbarton High Street. 
The coastal risk is confirmed by the applicant's flood risk assessment, which
identifies the risk for a range of return periods and climate uplifts. The applicant has
taken the flood risk into account in the site design, with commercial development on
the ground floor level and residential development on upper floors. A proposed health
centre is located at the higher part of the site. The site is currently commercial, with
existing units at risk of flooding, so commercial development on the ground floor
would not increase the vulnerability to flooding. Residential units would be an
increase in vulnerability, but the units would be above flood levels. 
It is also noted that coastal flooding can be predicted in advance allowing for
evacuation before the event and installation of flood prevention measures. It is
accepted that the commercial units in the site would not be operational during
flooding and there are no requirements for shops to be open during an extreme flood
event. 
The flood risk assessment considers all risks of flooding, there is no reduction in
floodplain capacity, risk to others or need for future flood protection schemes (SEPA
does not require compensatory flood storage for coastal flooding and ground floor
commercial units will flood as at present). The Roads Service would recommend
flood resilient building methods and the assessment considers the impact of climate
change. 
Residential units will be set well above the flood level with commercial units designed
to be flooded. We are aware SEPA are objecting to the development on these
grounds, but we would note that there is an existing flood risk to Dumbarton and the
new development more explicitly takes into account future flood risk. As coastal
flooding can be predicted well in advance, there is the potential for evacuation of the
area and/or installation of flood prevention measures. The Roads Service would
advise the applicant that the site should be flood resilient and does not increase the
existing flood risk to the surrounding area. 
4.3 West Dunbartonshire Council Roads Service 
There are no objections to the principle of the proposed development subject to a
variety of matters being addressed by condition. These include the requirement to
consider servicing and parking inclusive of disabled bays, electric vehicle parking and
cycle parking in relation to the National Roads Design Guide (NRDG) and WDC
standards applicable at the time of any application for the approval of matters
specified by condition (AMSC). It is recommended a Green and Active Travel Plans
are submitted. Should any stopping up or diversion of publicly adopted roads or
footways be required, this should be addressed via the relevant sections of the
planning legislation. 
Page 19

Page 20

It is further recommended that joint pre and post inspections of all publicly adopted
areas are undertaken to ensure that they are retained in their existing condition, that
all necessary permits and permissions are obtained prior to the commencement of
works and a construction programme together with detailed traffic management be
agreed in advance of any works. 
4.4  West Dunbartonshire Council Environmental Health Service 
Further, more detailed site investigations and assessments require to be undertaken
for all future applications for AMSC and it is recommended the full set of
contaminated land conditions be applied. Given the anticipated risks to the water
environment, it is also recommend that a site wide water environment risk
assessment is undertaken in advance of any AMSC applications. Conditions
recommended relating to site investigation, site-wide water environment investigation
and the re-use of site won material/the import of material. 
The submitted Noise Impact Assessment, (SWECO Outline Planning Noise
Assessment Rev C02) raises a number of issues that require to be addressed at
subsequent stages of Planning process as per the below extracted information. 
• The design considerations for the Healthcare centre (block B) are beyond the
scope of the PPiP application and should form part of the applications for
AMSC as is considered appropriate. 
• It will be important to ensure a good acoustic design is adopted at any
dwellings near the northern site extent or overlooking the High Street, to avoid
adverse noise impacts on the completed development, particularly at night
• It is recommended that the assessment of noise ingress is re-addressed
during the detailed design stage to establish the glazing and ventilator (if
relevant) performance requirements across the site.
• Careful consideration and design will be required to ensure that suitable
acoustic separation (between retail and residential) is achieved at the base
build
• Each retail/commercial use should be subject to individual acoustic
assessment for suitability.
• Building services noise should be considered as part of specific planning
applications for individual commercial uses. 
In summary noise is not considered to be a material constraint to the proposed
development and suitable acoustic conditions can be achieved across the site
subject to detailed design development in accordance with the Outline Planning
Noise Assessment 
4.5  Historic Environment Scotland (HES) 
The proposal is within close proximity to A-listed buildings such as St Augustine’s
Episcopal Church and the former Dumbarton Academy building (now Council
offices). The application documents do not discuss setting issues relating to these
buildings, but it does not appear to HES that the proposals are likely to create
significant detrimental impacts on the settings of the buildings. The proposal does not
raise historic environment issues of national significance and therefore HES do not
object. 
4.6 West of Scotland Archaeology Service 
No objections subject to a condition relating to the implementation of a programme of
archaeological works in accordance with a written scheme of investigation.
Page 20

Page 21

4.7  West Dunbartonshire Council Biodiversity Officer
Much of the required survey work has been completed and further survey
recommendations have been made for future applications for AMSC. No overall
landscape design or proposed planting schedules have been provided, and no
details of any replacement tree planting are set out. There are 17 trees for removal
and a further 3 that will be impacted, but no replacement strategy to account for this
at this stage. 
There are, however, a number of very suitable biodiversity enhancement proposals
that are of an appropriate scale for this site. Section 6 of the Preliminary Ecological
Appraisal (PEA) outlines a biodiversity enhancement statement. Tree replacement
requires to be considered in future AMSC applications to offset tree loss. 
Section 5 of the PEA deals with mitigation and recommendations and these should
all be addressed in follow up applications. 
It is noted that the trees for removal are being treated as having no potential for bat
roosts. It is further noted that the bat surveys undertaken to date could be out of date
by the time any applications for AMSC forward. 
4.8 Scottish Water
No objections to the proposal but note there is live infrastructure om the proximity of
the development that may impact on existing Scottish Water Assets. 
5. REPRESENTATIONS 
5.1 One representation in support was received to the application. The full details are
contained within the planning file and are available for public viewing. Whilst in
support, points relating to landownership adjacent to the Dumbarton Bowling Club
were raised. These have subsequently been addressed by the applicant.  
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Policy 4
6.1  The site is partially within the ‘Clyde Mission’ area, identified as one of eighteen
National Developments with National Planning Framework 4 which recognises that
significant land assets are under-utilised across the Clyde, and that longstanding
inequality, in relation to poor environment and health outcomes require to be tackled
as a national priority. The Clyde Mission designation aims to repurpose and
reinvigorate vacant and derelict land as well as adapting the area to the impacts of
climate change, where nature-based solutions would be particularly supported.
Delivery of the development proposals for the site would support the objectives of this
national development. 
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the global
climate and nature crises. Policy 2 also relates to the climate in the form of climate
mitigation and adaptation, and states development proposals will be sited and
designed to minimise lifecycle greenhouse gas emissions as far as possible and
development proposals will be sited and designed to adapt to current and future risks
from climate change. Policy 3’s intent is to protect biodiversity, reverse biodiversity
loss, deliver positive effects from development and strengthen nature networks. With
appropriate conditions, there is no conflict with these policies. 
Page 21

Page 22

6.3  As part of the site is located within a conservation area Policy 7 applies.
Development proposals in or affecting conservation areas will only be supported
where the character and appearance of the conservation area and its setting is
preserved or enhanced. A number of listed buildings are located within the town
centre in the vicinity of the site and Policy 7 further advises that development
proposals affecting the setting of listed building should preserve their character and
special architectural and historic interest. No concerns arise in this respect. 
6.4 Within the Artizan Centre, some of the units are vacant as well as the vacant land
which has been left by demolitions and as such Policy 9 addressing brownfield,
vacant and derelict land and empty buildings applies. Development proposals that
will result in the sustainable reuse of brownfield land including vacant and derelict
land and buildings, whether permanent or temporary, will be supported. 
6.5 As a developed coastal site, Policy 10 applies. Part a)i. of the policy requires that the
development does not in and of itself require additional coastal protection measures,
cause increased coastal flood risk and erosion to other people. The proposal is not
expected to require additional coastal protection or to result in increased risk to
people elsewhere. The Planning Statement accompanying the application
acknowledges that part a)ii. of the policy is not met in full, the flood risk and predicted
flood levels meaning the proposal may not be supportable in the long-term, taking
into account climate change. 
6.6 Policy 12 relates to zero waste and supports the reuse of existing buildings and
infrastructure. Whilst there have been some demolitions on site already, there are
sections of the Artizan Centre which are being retained for retail as well as extended
for residential purposes. The reuse of existing buildings on the high street is
supported by part b)i. and part b)ii. requires proposals to minimised demolition and
salvage materials for reuse. The demolition of the buildings was carried out under
permitted development rights and it not part of this application and as such there is
no control over the materials which are now removed. Part b)iv and v will be
addressed by selecting materials with as low embodied carbon as possible and with
the opportunity to be reused. This can be addressed in future planning applications.
Part c requires proposals to detail how waste will be managed. This can also be
addressed by condition. 
6.7 Sustainable Transport is covered by Policy 13. Part a) supports proposals to
improve, enhance or provide active travel infrastructure, public transport
infrastructure or multi-modal hubs will be supported. Part b) supports development
proposals where it can be demonstrated that the transport requirements generated
have been considered in line with the sustainable travel and investment hierarchies.
Part c) requires where a development proposal will generate a significant increase in
the number of person trips, that a transport assessment will be undertaken in
accordance with the relevant guidance. Part d) of the policy does not support
proposals for significant travel generating uses in locations that would increase
reliance on the private car. Part e) of the policy supports ambitious proposals for low
parking in urban locations well served by public transport, such as this one. Part f) of
the policy states that significant travel generating uses will only be supported with a
Travel Plan, which are proposed within the Transport Assessment. In principle it is
considered that this policy supports the proposal, subject to conditions. 
6.8 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale as per Policy 14. Policy 15 relates to
local living and 20-minute neighbourhoods. Development proposal will contribute to
local living including, where relevant, 20-minute neighbourhoods. Consideration will
Page 22

Page 23

be given to existing settlement pattern, and the level and quality of interconnectivity
of the proposed development with the surrounding area, including local access to
shopping and playgrounds and informal play opportunities, parks, green streets and
spaces. 
6.9 Policy 16 relates to Quality Homes. The proposal is not on an allocated site within the
Local Plan or proposed Local Development Plan 2 and so is not in accordance with
part a) of the policy. Whilst a specific “Statement of Community Benefit” has not been
provided in accordance with part b) the information expected as part of this is
provided within the Planning Statement, Economic Benefit Statement and the Design
and Access Statement. Part c) of the policy supports the development of homes that
improve affordability and fill any identified gaps in provision. This includes affordable
homes (iv) and homes for older people (vi) which are provided within the application.
Part e) of the policy requires developments for new homes to include at least 25%
affordable provision which is provided. Part f) of the policy states housing on land not
allocated in the LDP will only be supported if: 
i. the proposal is supported by an agreed timescale for build-out 
ii. The proposal is otherwise consistent with the plan spatial strategy and other
relevant policies including local living – 
iii. And either:
• delivery of sites is happening earlier than identified in the deliverable housing
land pipeline. This will be determined by reference to two consecutive years of
the Housing Land Audit evidencing substantial delivery earlier than pipeline
timescales and that general trend being sustained; or
• the proposal is consistent with policy on rural homes; or
• the proposal is for smaller scale opportunities within an existing settlement
boundary; or
• the proposal is for the delivery of less than 50 affordable homes as part of a
local authority supported affordable housing plan. 
Whilst it is accepted that the development will support the reuse of brownfield land,
bring economic and community benefits and support local living it remains that it is
not allocated for housing within the LDP. The development proposal which includes
the provision of new residential properties does not therefore wholly accord with
Policy 16. 
6.10 Policy 18 relates to Infrastructure First. NPF4’s glossary defines Infrastructure First
and this includes transport infrastructure and services, health and social care
services, green and blue infrastructure as well as spaces for play and recreation. Part
a) of this policy states that development which contributes to/provides infrastructure
identified in the LDP will be supported. Public realm and green infrastructure are
included within the first phase, which is consistent with LDP2’s green infrastructure
led approach. It is noted that the proposal also provides opens space in line with the
LDP2 requirements. LDP2s spatial strategy for Dumbarton supports improvements to
active travel routes across the town centre, emphasising the connection to the train
station. 
6.11  As the buildings will be occupied by people part f) of Policy 19 applies. Development
proposals for buildings that will be occupied by people will be supported where they
are designed to promote sustainable temperature management, for example by
prioritising natural or passive solutions such as siting, orientation, and materials. This
can be addressed via condition. 
Page 23

Page 24

6.12 Policy 20 relating to blue and green infrastructure supports the inclusion of new blue
and green infrastructure within development in part b) of the policy. Temporary open
space or green space on unused or under used land is supported by part d) of the
policy and part e) requires that proposals include maintenance plans covering
arrangements for long term planning and upkeep. Policy 21 which addresses play,
recreation and sport encourages, promotes and facilitates spaces and opportunities
for play, recreation and sport. 
6.13 Policy 22 on flood risk and water management states that proposals will not increase
the risk of surface water flooding to others, or itself be at risk; manage all rain and
surface water through sustainable urban drainage systems (SuDS) and seek to
minimise the area of impermeable surface. The application site is within an area at
risk of flooding. Matters relating to flood risk are assessed in detail below but the
proposal cannot be held to accord with Policy 22. 
6.14 Policy 23 aims to safeguard people from environmental harm and promote and
facilitate development that improves health and wellbeing. Development proposals
that will have positive effects on health will be supported. Development proposals
that enhance and improve the vitality and viability of city, town and local centres,
including proposals that increase the mix of uses, will be supported through Policy
27. Part e) supports development proposals for residential development within
city/town centres will be supported including new build residential development, the
re-use of a vacant buildings within city/ town centres where it can be demonstrated
that the existing use is no longer viable and the proposed change of use adds to
viability and vitality of the area and the conversion, or reuse of vacant upper floors of
properties within city/town centres for residential. 
6.15  Policy 28 aims to encourage, promote and facilitate retail investment to the most
sustainable locations that are most accessible by a range of sustainable transport
modes. The proposal is located within the defined Town Centre and as such retail in
this location is supported. 
6.16 Whilst the development is supported by many of the policies within NPF4, the
proposal does not accord with Policy 16 and Policy 22. Conflicts between policies
can be expected and it remains that the proposal is supported as a whole by NPF4.
A full assessment together with the weighing of different policies and considerations
is set out in the appraisal in Section 7 below. 
West Dunbartonshire Adopted Local Plan 2010 
6.17 Policy UR1 encourages the redevelopment and re-use of underused, vacant and/or
derelict land and buildings for appropriate uses such as housing. Policy RP1
designates areas, including Dumbarton Town Centre and the Artizan Centre, as a
regeneration priority for urban renewal. 
6.18 Policy RD1 gives preference to residential development on brownfield sites within
urban areas. Policy SUS1 seeks to integrate land use and transport, meet social and
economic needs, minimise environmental impacts and minimise the use of energy
and resources. 
6.19 Policy GD1 seeks to ensure that all new development is of a high quality of design
and respects the character and amenity of the area. Policy GD2 encourages the
reuse of vacant, derelict, or under used land. 
Page 24

Page 25

6.20 Policy H4 states that new housing developments will be expected to be appropriate
to the wider landscape and built character of the surrounding area, and to meet
certain criteria. 
6.21  Policy RET1 sets out a sequential approach to new retail, commercial leisure, cultural
and public service developments, with preference given to town centre locations. The
policy is similar to NPF4 Policy 27 part b). Part of the proposal is designated in
Schedule RET4 of the plan as a Retail Development Opportunity (RET 4(6)). This
designation is in the approximate location of the proposed Health Centre (Block B),
meaning that this policy does not support the proposal. Policy RET5 seeks to
improve the environment of the town centres of Alexandria, Clydebank and
Dumbarton and Policy RET6 seeks to protect and enhance the retail and commercial
function by encouraging the improvement of existing retail floorspace. 
6.22 Policy T1 supports prioritising sustainable transport measures and Policy T4 requires
sites to be integrated into walking, cycling and public transport networks and located
so that they are accessible to public transport. 
6.23 Policy E1 relates to the Council’s biodiversity duty. Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable tree
planting. 
6.24 Policy BE1 seeks to ensure that no works adversely affect the appearance and
character of conservation areas and Policy BE2 takes a similar approach in respect
of ensuring that proposals do not adversely affect the setting of any listed buildings.
Policy BE3 encourages and supports the renovation rather than demolition of derelict
properties which are not listed but are considered to contribute to the townscape
character of the surrounding area. Policy BE5 advises on development proposals
that impact upon local archaeology and the approach to assessing and recording
features. 
6.25 Policy R2 states that the Council will have due regard to the provision of open space
as an integral part of proposals. Policy R3 relates to the enhancement of open space
and sports facilities. Policy R5 seeks to encourage access for pedestrians and
cyclists to waterways and protect existing core paths and rights of way. 
6.26 Policy PS3 relates to Public Service Opportunities and encourages new or improved
public service provision in the area, particularly where there is social or economic
need and in close proximity to new homes, provided it facilitates development which
accord with the plan 
6.27 Policies F1, F2 and F3 aim to ensure that new development is not at risk from, and
does not increase the risk of flooding, and has suitable SUDS drainage infrastructure.
There is a general presumption against development within the flood plain. The up-
to-date development plan position in flooding is set out within Policy 22 of NPF4
which therefore has primacy in this instance. 
6.28 Policy DC 2 requires new shopfronts, whether on existing buildings or on new
developments, to be designed in accordance with the Council’s Shop Front Design
Guide for commercial frontages. 
6.29  The proposal does not comply with all policies of the adopted local plan and is
assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
Page 25

Page 26

West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would
not adopt Local Development Plan 2. The Proposed Local Development Plan 2
(LDP2), incorporating the recommended modifications of the Examination Report
received on 22 April 2020, which were accepted by the Planning Committee of 19
August 2020, remains the Council’s most up to date spatial strategy and is therefore
afforded significant weight in the assessment and determination of planning
applications, subject to compatibility with NPF4. The Scottish Ministers’ Direction
relating to the adoption of LDP2, dated 18 December 2020, is also a material
consideration. 
7.2 The Development Strategy in the Town Centre and Waterfront supports mixed use
development within the town centre, town centre living, and improvements to the
Artizan Centre. Regarding improvements to the Artizan Centre, the explanatory text
on page 34 of LDP2 states that this designation is placed to enable enhancement of
the retail offer. Dumbarton Policy 1 High Street and Retail Development supports a
more diverse and vibrant Town Centre and will encourage a range of uses within the
Core Town Centre area where they accord with Policy SC2 of the Plan. 
7.3 Policy CP1 seeks to ensure that all new development will be expected to contribute
towards creating successful places by having regard to the six qualities of a
successful place (distinctive, adaptable, resource efficient, easy to get to/move
around, safe and pleasant, and welcoming). Policy CP2 requires the integration and
consideration of green infrastructure from the outset of the design process through to
its maintenance and stewardship of the resource. Policy CP3 requires that
Masterplans be prepared on all sites within the Delivering Our Places section of the
plan, which includes this proposal. The masterplan is required to include proposed
phasing and strategy to bring the site forward. 
7.4 Policy H3 supports particular needs housing on the sites contained within Table 3 of
the Plan, and other suitable sites, where they accord with the relevant policies of the
Plan. Policy H4 relates to residential amenity. The policy states that the Council will
protect, preserve and enhance the residential character and amenity of existing
residential areas at all times. 
7.5 Policy SC1 sets out a sequential approach to new retail, commercial and leisure, with
preference given to town centre locations. Policy SC2 supports a range of different
uses within the core Town Centre where they help to improve the vibrancy of the
Town Centre. Policy SC3 supports non-retail uses within Town Centres where these
comply with Policy SC2, encourage visits to the Town Centre and are appropriate to
the Town Centre’s role and function. Town Centres are the preferred location for new
leisure uses and public services unless these are serving a specific neighbourhood,
community or catchment which is best served more locally. 
7.6 Policy BE1 takes a similar approach to the adopted Local Plan in respect of
archaeology with Policy BE2 advising on the impact upon the setting of listed
buildings. Due to the location within a conservation area, Policy BE3 applies. Policy
BE3 does states that new development within or affecting a Conservation Area
should be of a high standard of design and enhance the character of the area and
should have regard to the Conservation Area Appraisal for that area. 
7.7 Policies GI2 and GI4 relate to green infrastructure. Policy GI2 requires new
development to meet with the open space standards set out within the policy. Where
a development has difficulty providing these standards on site, or where a relaxation
Page 26

Page 27

of the standards can be justified, developers will require to accord with Policy GI4
and provide a contribution towards the types of projects outlined within the policy and
detailed in the Green Network and Green Infrastructure Planning Guidance. GI4 sets
out the requirements for Developer Contributions. It is considered a relaxation can be
justified in this instance and this is discussed fully below. 
7.8 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree, water
environment and flooding policies of the adopted Local Plan, although in respect of
flooding, the up-to-date development plan position is set out within Policy 22 of NPF4
which has primacy. 
7.9 The Council will actively encourage the temporary greening of any vacant, derelict,
stalled or underused site to improve the contribution to the green infrastructure and to
improve the character and amenity of the particular community or area in accordance
with Policy ENV7. Policy ENV8 relates to air, light and noise pollution and states that
all new development must ensure that significant adverse noise impacts on
surrounding properties and uses are avoided. Policy ENV9 requires developers to
establish the nature of any contamination on any potential development site. Where
contamination is present and risks to key receptors are identified, then remediation
will be required to ensure the site can be made suitable for its future use. 
7.10 Policy CON1 requires development proposals to accord with Designing Streets, the
National Roads Development Guidelines, and be in alignment with the provisions of
the Regional and Local Transport Strategies. Policy CON4 requires new residential,
business and industrial developments shall be required to install the necessary
infrastructure to enable all new premises to be connected to full fibre optical
networks. 
7.11 Whilst the proposal is supported by many policies within proposed LDP2, there are
policy conflicts including that the site is not allocated for housing and this is assessed
fully below. 
Historic Environment Scotland’s Policy and Guidance 
7.12 The Historic Environment Policy for Scotland seeks to ensure that changes to
specific assets and their context are managed in a way that protects the historic
environment. 
7.13 Historic Environment Scotland’s Managing Change in the Historic Environment
Guidance Note series provides advice and guidance to Planning Authorities
determining applications which affect the historic environment. Guidance Note
subjects relevant to this proposal include setting, external walls, shopfronts and
windows. 
7.14 The guidance note on ‘Setting’ advises that setting can be important to the way in
which historic structures or places are understood, appreciated and experienced, and
provides guidance on factors to be considered in assessing the impact of a change
on the setting of a historic asset or place. Overall, it is considered that the principle of
the proposal will enhance the setting of the Dumbarton Conservation Area and be to
the benefit of the wider area and therefore have no detrimental effects to any
surrounding Conservation Area or listed buildings. 
7.15  The guidance on ‘External Walls’ highlights that the design, materials, method of
construction, colour, texture, detailing and finish typically contribute to the character
of a historic wall. Whilst the buildings of the Artizan themselves are not listed they
Page 27

Page 28

form a part of the fabric of the Conservation Area. Shopfronts are highlighted as
contributing to the architectural quality of a building and to the character of a place. 
7.16 Overall, the proposal presents no conflicts with Historic Environment Scotland’s
Policy and Guidance. 
Dumbarton Town Centre Conservation Area Appraisal
7.17 Dumbarton Town Centre Conservation Area was designated on 11 October 2019.
The Conservation Area Appraisal notes that the architecture of Dumbarton town
centre falls into a number of distinct eras which can be easily identified by the styles
and materials employed. This creates interest and relieves potential monotony. It is
noted that since the turn of the century, West Dunbartonshire Council has seen the
regeneration of the town centre as a priority, including the Artizan Centre at the heart
of the 1960s re-development which was re-modelled in 2004 
7.18 The creation of the Artizan Centre and its redevelopment is noted at several points
throughout the appraisal, with comments made that the re-modelling (and
enlargement) of the Artizan Centre destroyed the 1960s pedestrian route through the
town square to the cinema, housing and station beyond; that there are a number of
unresolved areas behind and near the Artizan Centre that do not aid orientation; and
that there is even a uniformity of scale in the buildings that were delivered as part of
the creation of the Artizan Centre. 
7.19 The Dumbarton Town Centre Conservation Area Proposal of 2019 noted that the
High Street Character Area had retained much of its original form in terms of its solid
frontage and retail designation. The lack of quality in shop frontages and signage is
extremely detrimental to the character and townscape of Dumbarton. Many
shopfronts and signage displays on High Street are constructed of non-traditional
materials, and do not reflect the original proportions of traditional shopfronts. 
7.20 Open space in the town centre comprises largely of car parks and small pockets of
grass: Dumbarton is well served by places to park and the majority of these are
landscaped with hedge planting and trees (some flowering). 
7.21 The appraisal also notes that given the various periods of development evident in the
Dumbarton Town Centre Conservation Area, there is a wide range of building
materials used, not all of which fall under the category of “traditional”. Public realm
finishes are stated to be tidy, albeit clinical. 
Creating Places Guidance and Green Network and Green Infrastructure Guidance
7.22 The Creating Places Supplementary Guidance – November 2022 seeks to achieve
high quality development with a design led approach based on a thorough appraisal
of the site and an analysis of its context and sets out that this is expected for all
development proposals. 
7.23 The Green Network and Green Infrastructure Supplementary Guidance - November
2022 seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space created.
This will include a focus on biodiversity enhancement. 
Principle of Development
7.24 The site is located within Dumbarton Town Centre as defined by both the adopted
Local Plan and proposed Local Development Plan (LDP) 2. It further lies partly within
the core Town Centre area as defined by proposed LDP2. NPF4, the adopted Local
Plan and the proposed LDP2 all promote developments within town centres and
Page 28

Page 29

provide explicit support for development which increase viability and vitality of the
town centre. 
7.25 Policy 27 part e) of NPF4 specifically supports new build residential development
proposals within town centres and reflect the vision and policy intent within NPF4 to
support town centres and their positive adaption to ensure a long-term sustainable
future of such centres. Part f) also supports residential uses at ground floor level
where they retain an attractive and appropriate frontage, do not adversely affect the
vitality and viability of a shopping area or the wider centre and do not result in an
undesirable concentration of uses, or ‘dead frontages’. Part g) requires proposals for
town centre living to take into account the residential amenity of the proposal. As the
application proposal is in principle, parts f) and g) would be assessed in detail at the
point of further submissions for approval of matters specified in condition, however
the principle of the proposal offers no conflict with part f) and there is nothing to
suggest that a suitable level of amenity for new town centre residents could not be
achieved in the detailed design. 
7.26 Policy 27 also supports a mix of uses that enhance and improve the vitality and
viability of city, town and local centres, including proposals that increase the mix of
uses, will be supported. Restaurants, cafes and public houses are all acceptable
uses within the town centre in this respect. In regards to hot food takeaways, part c)
of Policy 27 states that development proposals for non-retail uses (including hot food
takeaways) will not be supported if further provision of these services will undermine
the character and amenity of the area or the health and wellbeing of communities. As
this is an application for planning permission in principle, the detail of individual uses
including hot food takeaways is not defined. There is, however, capacity within the
town centre for further hot food takeaways, however the acceptability of the number,
location and general detail will be assessed as part of further submissions. Policy 27
part b) supports proposals including offices, healthcare and leisure facilities. As such
the proposal to include Class 4 (Office), Class 10 (Non-residential institutions) and
Class 11 (Leisure) as part of the wider development is supported in this location.
Policy 28 supports retail within existing town centres. 
7.27 Whilst the site is designated in the Local Plan and proposed LDP2 for regeneration or
improvement, it is not explicitly allocated for housing. As such part f) of Policy 16
applies. Part f) states that housing on land not allocated in the LDP will only be
supported in certain circumstances. This includes an agreed timescale for build out
which can be agreed via a phasing plan. Whilst proposed details have been provided
within the application, these were based on the expected position at the time of
submission. Conditions can ensure an up-to-date phasing plan and associated
details are provided. The proposal is consistent with the spatial strategy of the
adopted plan and proposed LDP2 in that the area is highlighted as a priority for
redevelopment or improvement. The proposal, however, does not meet any of the
criteria in part f) iii because the deliverable housing land pipeline has not yet been
established; the proposal is not in a rural area; the proposal is not of a smaller scale
(though it is within the settlement boundary); and the proposal is more than 50
homes. 
7.28 Policy 16 part b) requires a “Statement of Community Benefit”. This information is
available in the Planning Statement, Economic Benefits Summary, and the Design
and Access Statement and set out that the development will improve community
resilience with additional population, benefit to local business within the town centre,
create employment opportunities and increase housing options. The details provided
are considered acceptable. Policy 16 part c) supports the development of homes that
improve affordability and fill any identified gaps in provision. This includes affordable
Page 29

Page 30

homes (iv) and homes for older people (vi). These are both identified needs in the
Council’s Local Housing Strategy. This part of the policy supports the proposal. Part
e) of Policy 16 requires developments for new homes to include at least 25%
affordable provision. The housing element of this proposal is indicated to be 100%
affordable meaning it complies with this part of the policy. 
7.29  Whilst the proposal does not wholly accord with Policy 16, the age of the adopted
and proposed Local Plans must also be taken into account. Since the adoption of the
Local Plan and examination of proposed LDP2 national planning policy has changed
and National Planning Framework 4 has been adopted. NFF4 includes specific
policies regarding town centre living and encourages proposals within the town
centre to be in accordance with the Town Centre First Principle. The Town Centre
First Principle asks that government, local authorities, the wider public sector,
businesses and communities put the health of town centres at the heart of decision
making. It seeks to deliver the best local outcomes, align policies and target available
resources to prioritise town centre sites, encouraging vibrancy, equality and diversity.
It is considered that the proposal will support the long-term town centre regeneration
plans for Dumbarton Town Centre and will complement previously approved
proposals for the regeneration within the Town Centre like Glencairn House. The
proposals will provide significant enhancement to the area, which in turn will create a
more attractive environment which will potentially encourage people to the Town
Centre. Any increase in footfall will have a positive impact on the overall vitality and
viability of the Town Centre. 
7.30 It is therefore considered that there is strong support for a development of this
description in this location. The proposal will provide significant benefit to the town
centre, by allowing it to adapt positively to the long term economic environment, bring
about significant and long term environmental benefit and bring people back into the
town centre as a destination which supports a wide range of uses together with town
centre living. It therefore rests to consider whether there are any other material
planning considerations that suggest that the proposal would be unacceptable. 
Site Layout, Design and Appearance
7.31  The contribution of the development to the town centre in terms of layout, design and
appearance, how this contributes to the six qualities of good placemaking and the
wider benefits this can bring is also an important factor in assessing the application
proposal. The site layout as indicated in the application in part remains as is, with the
shopfronts remaining in situ and College Way retaining its current development
pattern. The new landscaped square extends to an area of approximately 1600
square metres. Underground surface water attenuation crates which must avoid all
other underground utilities will be provided below the new square. The new
landscaping features to Collage Way also require to avoid existing utilities. However,
their placement retains the strong through route along College Way and links the new
square to the High Street via a high-quality public realm space which will provide a
notable focal point within the town centre. 
7.32 Phases 2 and 3 of the proposal are proposed to be located on plots freed up the
initial demolition works. Block A/Plot A is located to the north of the site adjacent to
Risk Street and is generally in line with previous development. Block B/Plot B is
proposed as a four-storey Health Centre with circa 6000m2 of floor space. This is
located on the west side of College Way and whilst it is stepped back from the
current building line on College Way, its setting back allows for the public “square”
are to be created. 
Page 30

Page 31

7.33 Block/Plot C is proposed to be located towards the north of the site on the east side
of College Way. Again, this plot is located further back from the existing building line,
however it setting back allows for a strong through route towards the train station.
Block D remains retail with refurbishment and repurposing and is located on the west
side of College Way. Block E is proposed to be consolidated retail with the
introduction of affordable housing units through new extensions. These new
extensions reflect the current layout of the Artizan Centre. 
7.34 New developments require to be well designed, take cognisance of the setting into
which they are introduced and provide a high-quality appearance. The design and
access statement makes reference to a colour palette and materiality that have been
developed to reference the heritage of the site and wider town. Dumbarton’s prolific
glassmaking industrial heritage was clustered in the northeast of the town in an area
known as ‘Artisan’. This legacy provides the namesake for the current Artizan Centre
and provides a rich narrative to draw upon for the materiality concepts. Whilst defined
materials are not proposed at this stage, approach of utilising warm tones and
textures is indicated in the Design and Access Statement and this would be reflected
in a palette of red, rust and light brown brick with feature elements like balconies,
railing and spandrel panels of metal finished in heritage tones. It is clear that the
proposed works will be a visual change to what is existing, but it is considered that
the principle of the proposal the overall approach to design and layout together with
the proposed materials and colours will add richness and interest to the significant
benefit of the appearance of the town centre 
7.35  The shopfronts along High Street are also within the Dumbarton Town Centre
Conservation Area. The Conservation Area Appraisal for Dumbarton Town Centre
particularly notes that the lack of quality in shop frontages and signage is extremely
detrimental to the character and townscape of Dumbarton. The shopfronts in
question are not within historic buildings, but rather a more recent shopping precinct
development. Their replacement was considered under application DC24/081/FUL
and the upgrade of the existing shopfronts with a high design quality and materials
was considered to be a benefit to the appearance of both the Conservation Area and
wider Town Centre. 
7.36 Overall, it is considered that the approach to design, layout and use of materials
indicated in the application will create a well-designed development which will
address the six qualities of successful places by ensuring the layout and form of the
development is appropriate, complying with policies GD1 and CP1 of the adopted
and proposed Plans, as well as Policy 14 of NPF4. In addition, the proposal whilst
bringing in new colour palettes and materials is appropriate within the Dumbarton
Town Centre Conservation Area, in accordance with the policies relating to
conservation areas and the historic environment. Whilst the detail of these matters
will be fully assessed through future applications for AMSC, it is clear that a high-
quality development can be created to the significant benefit of the wider town centre. 
Open space, landscaping and trees 
7.37 Open space and landscaping are an integral part of phase 1 of this site which is
already consented as part of the separate permission ref: DC24/081/FUL. Open
space is created where buildings previously part of the Artizan Centre once sat. As
the buildings that occupied the site previously were not residential and are outwith
the boundary of the Conservation Area, their demolition did not require any
application for consent in terms of Planning. Within the space created, a shelter
structure is to be created. This is formed of a series of vertical elements which take
design references from the structures of Dumbarton’s shipbuilding heritage. The
shelter structure also features a sedum roof. Beyond the shelter structure is a
Page 31

Page 32

proposed play space. This incorporates a variety of equipment for different ages and
abilities and draws inspiration from Dumbarton’s connection to the water with sailboat
and wave shaped play equipment. To the west of the shelter structure and play
space is an area of landscaping is to be provided which also incorporates play in the
form of logs and stepping stones. A ‘meanwhile’ area of landscaping is also currently
consented within part of the current application site where buildings were
demolished. This incorporates existing trees as well as hard and soft landscaping to
create a maze pattern. The wider development of the site will build on this initial
phase and there is nothing to suggest that the expectation that the detailed
development that comes forward could not be appropriate and compliment this first
phase of works. 
7.38 There are a number of trees on the site currently. The applicant’s Arboricultural
Impact Assessment identifies 17 trees which would be removed to accommodate the
redevelopment of the site. The trees in question are generally ones within close
proximity of the existing Artizan Centre buildings and the function of these trees was
to provide part of the landscape setting of the Centre that occupied the site. They are
not protected. Whilst five of these trees are identified as Category B trees, the
majority are identified as Category C trees which are generally trees of lower quality
and have a more limited lifespan. The Council’s Biodiversity Officer notes the
importance of ensuring that tree replacement is fully considered in future AMSC
applications to offset tree loss. The current application indicates new planting as part
of the proposal is to be located centrally within College Way, as well as within a
landscaped area surrounding the shelter structure and play space as well as within a
“meantime” space which will temporarily be greened with the expectation that further
development will occur on this space at some point in the future. The proposal
includes an increase in the number of trees planted as well as shrub/perennial
planting and wildflower grass seeding and amenity grass seeding in the “meantime
space”. The increase in planting is in accordance with Policies relating to biodiversity
as well as creating places. In addition, the Council has a specific policy relating to the
temporary greening of spaces and as such the “meantime” space is in accordance
with this policy. This will be fully considered through future AMSC’s as will the
approach to tree replacement across all phases of the development. Details of how
remaining trees are protected during construction can be addressed by condition. 
7.39 In considering open space provision for residential developments, this is set out
within Policy GI2 of proposed Local Development Plan 2 together with the Green
Network guidance. Open space calculations together with the level of any
contribution are based on the number of bedrooms provided. As this application is
considered in principle, the final design and layout of the development inclusive of
the detail of areas of open space together with the number of bedrooms in any
residential property are not known at this stage. With the number of units suggested
in the application, based on the standards set out, a notable area of open space
would ordinarily be required. However, such an approach is not one which would
generally follow the existing pattern of development within the town centre which is
based on a higher density layout. Given the nature of the development and the wider
area, the public realm works proposed and that residents choosing to live within a
town centre area do so to benefit from the proximity of town centre services and
transport links rather than to benefit from locally accessible open space, it must be
considered if such an approach is appropriate in this instance. Given the above,
together with the significant benefits that the wider development would bring to the
town centre including significant economic benefits, it is concluded that a departure
from the normal open space requirements and any associated developer
contributions can be justified in this case. Residents within the town centre would
also be able to benefit from the attractive waterfront walkway and associated green
Page 32

Page 33

areas which lies nearby. It does not follow, however, that any residential
development will have no outside area or associated landscaping. Areas such as
drying greens together with landscaping to provide a setting for the new buildings will
be expected and this will be considered as part of future applications and AMSC
considering the detail of the development. 
Flooding and drainage
7.40 Considering flooding and drainage, the site has been identified as a location which is
at risk of Coastal Flooding as shown on the SEPA Flood Maps and that the main
factors contributing to coastal flooding within Dumbarton are the tide level, wind
speed and direction. Coastal flooding frequently happens within the area when the
tidal level is 3.6m and above with the wind direction coming from the southwest at
20mph and above. This results in the flooding of Riverside Lane and the car parking
area only. For it to reach the site it would need to be significantly higher in tide level
and wind speed. There has been one historic flooding event recorded affecting
Dumbarton High Street. The coastal risk is confirmed by the applicant's flood risk
assessment, which identifies the risk for a range of return periods and climate uplifts. 
7.41 Policy 22 of NPF4 sets out to strengthen resilience to flood risk by promoting
avoidance as a first principle and reducing the vulnerability of existing and future
development to flooding. Development proposals at risk of flooding or in a flood risk
area will only be supported in certain circumstances and part a) of Policy 22 sets out
these circumstances. They are as follows: 
i. essential infrastructure where the location is required for operational reasons;
ii. water compatible uses; 
iii. redevelopment of an existing building or site for an equal or less vulnerable
use; or. 
iv. redevelopment of previously used sites in built up areas where the LDP has
identified a need to bring these into positive use and where proposals
demonstrate that long term safety and resilience can be secured in accordance
with relevant SEPA advice. 
7.42 Essential infrastructure is defined within the glossary of NPF4 and the proposal does
not fit into the definition of essential infrastructure. Similarly, water compatible uses
are defined within the glossary, and the proposal is not a water compatible use.
Whilst the proposal includes the redevelopment of an existing site, the current uses
within the site are classed as “least vulnerable” in accordance with the SEPA Flood
Risk and Land Use Vulnerability Guidance. The proposed uses of residential and a
health centre are classed as “highly vulnerable” and as such the site is not being
used for an equal or less vulnerable use in accordance with part a) iii. 
7.43 Part a) iv relates to the redevelopment of previously used sites in built up areas
where the LDP has identified a need to bring these into positive use and where
proposals demonstrate that long term safety and resilience can be secured in
accordance with relevant SEPA advice. The Artizan centre is an underoccupied site
in a built up area. The adopted Local Plan identifies the whole town centre, including
the Artizan Centre, as a Regeneration Priority in Policy RP1. LDP2 designates the
Artizan Centre as requiring improvement. The Development Strategy for Dumbarton
also supports mixed use development of the town centre, including town centre living.
Both the adopted Local Plan and LDP2 identify a need to bring the Artizan Centre
into positive reuse. In this regard, the development partially meets part a) iv of the
policy, but full compliance can only be achieved if it can be demonstrated that long
term safety and resilience can be secured in accordance with relevant SEPA advice. 
Page 33

Page 34

7.44 The submitted Planning Statement and Flood Risk Assessment states that given the
nature of the site and associated flood risk, it is not capable of being developed in a
way that can be considered to be made safe and resilient in the long term.
Specifically, the proposal is unable to meet the requirements of remaining both safe
and operational during a flood event or providing safe and dry access and egress in
event of a flood. This is situation is based on the worst-case scenario of flood risk
increase caused by climate change as used by SEPA and comprising Representative
Concentration Pathway (RCP) 8.5. RCP refers to the expected concentration of
greenhouse gasses in the atmosphere by 2100. 
7.45  The FRA makes the case that a more conservative RCP could be applied in this case
as it is redevelopment of a brownfield site. Paragraph 4.118 of the Planning
Statement summarises which of the Policy 22 a) requirements are met using different
RCPs. An RCP of 4.5 would mean the proposal meets all the requirements listed in
bullet points under Policy 22 part a). Under a RCP 6 scenario, it is not expected that
safe access or egress can be achieved, but the development could remain
operational. 
7.46 In considering the proposal, SEPA are satisfied that with the further information
submitted in respect of the FRA, the submissions meet the expected technical and
reporting standards and this it enables an agreed understanding of the flood hazard.
In their consultation response, SEPA state that had this been a like-for-like
redevelopment of a commercial site, they would have no objection. However, the
proposal introduces residential properties and a health centre both of which are “high
vulnerability” to flooding. Given this and due to the flood risk of the site based on the
scenario used by SEPA, they have objected to the proposal. Whilst the site is
identified in the LDP as an area for regeneration it cannot be demonstrated that long
term safety and resilience can be secured in accordance with relevant SEPA
guidance and SEPA have objected in principle to the application. There are no formal
flood protection schemes or one under construction and as such these cannot be
taken into account. 
7.47 In further assessing the proposal, the Council’s Roads Service were also consulted
on flooding matters and consider that flood risk has been taken into account in the
site design, with commercial development on the ground floor level and residential
development on upper floors. It is however noted that as this is a planning permission
in principle, that such details are not confirmed. The Roads Service further comment
that the proposed health centre is located at the higher part of the site. The site is
currently commercial, with existing units at risk of flooding, so commercial
development on the ground floor would not increase the vulnerability to flooding,
Residential units would be an increase in vulnerability, but the units would be above
flood levels. 
7.48 The Roads Service set out that whilst the objection from SEPA is acknowledged, it is
noted that there is an existing flood risk to Dumbarton and the new development
more explicitly takes into account future flood risk. The Roads Service advise that in
considering the detail of the development, it a requirement that it is based on a flood
resilient design and does not increase the existing flood risk to the surrounding area.
In considering how a flood resilient design could be achieved, Policy 22 sets out
further requirements for development that meets exception iv of part a). Whilst it is
acknowledged that the development can’t be held to fully comply with Policy 22 a)
with reference to exception iv, it remains that some of the further requirements of the
Policy can be incorporated into the detailed design of the development. This includes
the first occupied or utilised floor of the development being above the flood risk level
with an additional allowance for freeboard underside of the development. It may be
Page 34

Page 35

that the proposal demonstrates at later stages that no residential development will be
located at ground level, however, due to the flood levels surrounding, an island of
development would be created. With this approach, it is acknowledged that an island
of development would potentially remain with safe, dry access and egress not being
available at the height of a flood event. 
7.49  It is acknowledged that the proposal does not accord fully with the criteria set out in
Policy  22 of NPF4. However, the nature of the flood risk must also be considered
and the flooding of this site in this case is coastal / tidal. This results in an increased
ability to forecast flood events and flood warnings can generally be provided up to 48
hours in advance of a flood event caused by weather/pressure conditions offshore. A
number of mitigation measures have been proposed in the application including
commercial development limited to ground floor as at present, to ensure that there is
no increase in vulnerability on the ground floor, development to include flood
management measure such as internal resilience measures (such as raised plug
sockets and electrics above flood level) property level protection (flood doors) and/or
wider scale measures such as demountable flood walls around buildings, signing up
to SEPA Fire of Clyde flood warnings and emergency management plan to be
developed for wider area. It also remains that the SEPA position on flood risk is
based on a worst case scenario and should a more conservative RCP be applied, the
risk reduces. Full details of the mitigation approach can be addressed through future
applications for AMSC. 
7.50 Notwithstanding the flood risk mitigation that could be incorporated into the final
design of the proposal and the lack of objection from the Council’s Roads Service on
flooding matters, it remains that the proposal does not accord with all requirements of
Policy 22 of NPF4 and the objection from SEPA on flooding grounds is
acknowledged. However, and in accordance with the Scottish Government Chief
Planner’s letter of 8th February 2023, NPF4 must be read and applied as a whole.
The Chief Planner is clear that conflicts between policies are to be expected. Factors
for and against development will be weighed up in the balance of planning
judgement. In a further letter of 13th October 2025, the Chief Planner additionally
advises that in assessing applications with reference to Policy 22, the Planning
Authority must consider SEPA’s advice, alongside all other relevant NPF4 and local
development plan policies and material considerations, before reaching a decision. It
is further reiterated that policies in NPF4 should be read and applied as a whole and
that some conflict between different policies is normal and to be expected. The Chief
Planner goes on to advise that the planning system requires decision makers to
weigh up all relevant policies, for example, quality homes, brownfield development
and town centre living, as well as relevant material considerations in applying
balanced planning judgement. 
7.51 In this case, it is clear that the proposal is supported by many development plan
policies and will have significant benefits to the town centre in redeveloping
underused and vacant brownfield land, the creation of quality homes and town centre
living, the overall vitality, viability and economic prosperity of the town centre and a
significant benefit to placemaking and the overall quality of the appearance of the
town centre together with providing an attractive place and destination to visit. This,
together with the nature of the flood risk and its predictability, and the mitigation
measure that could be incorporated into the final design and operation of the site
justifies the development contrary to Policy 22 of NPF4. 
7.52 Other matters such as how surface water drainage will be addressed inclusive of
SuDS in accordance with Part c) of Policy 22 can be addressed as part of further
applications for AMSC 
Page 35

Page 36

Residential Amenity
7.53 Whilst the immediate surrounding area is a busy town centre which is not
predominantly residential, it is recognised that residential properties do exist within
the town centre. Residential amenity can be affected in a number of ways. The
application site is situated in a busy town centre location which already sees a
significant level of noise and activity throughout the day and evening. Whilst
residents choosing to reside within the town centre may benefit from the proximity of
local shops, services and transport links, the same degree of residential amenity as
would be experienced within a primarily residential area cannot be expected. There is
nothing to suggest that the completed development would result in additional and
unacceptable noise and activity within the town centre beyond the established
position and to the detriment of existing residents. Any development project will
produce noise and an element of disruption during the construction phase and this
cannot be a determining factor in considering whether to grant planning permission.
The consultation response from Environmental Health recommends conditions to
mitigate against unacceptable construction noise and these are recommended to be
attached to any consent. It is also recognised that the construction phase and any
associated disruption will be short term in nature. 
7.54 In regards to the residential amenity of the proposed development, the Council’s
Environmental Health Service have concluded that noise is not considered to be a
material constraint to the proposed development and suitable acoustic conditions can
be achieved across the site subject to detailed design development in accordance
with the Outline Planning Noise Assessment. The requirement for an updated noise
impact assessment to be submitted as part of any application for AMSC addressing
the detailed design together with mitigation requirements inclusive of suitable
acoustic separation between commercial and residential uses and assessment of
commercial noise impact on residential properties arising from the detailed design of
the development. 
7.55 There is nothing to suggest that a suitable design and separation of buildings could
not be achieved in the detailed design of the development to ensure that matters
relating to overlooking and overshadowing do not cause concern. This is a matter to
be further considered via subsequent applications. 
7.56 Subject to conditions, it is considered that the proposal will have no significant
adverse impact on either existing residential amenity or the proposed residential
amenity and therefore complies with policy H4 of the proposed Local Development
Plan 2. 
Access, Parking and sustainable travel
7.57 The town centre location means the site is highly accessible with good connections
to the surrounding area including footpath network and nearby bus stops and the
train station. The site is approximately 0.5 miles or a 10 minute walk from Dumbarton
train station, and connectivity between the locations is also scheduled to be improved
through the Connecting Dumbarton project. From Dumbarton train station there are
regular trains to other stations in West Dunbartonshire and to a range of other
destinations including Glasgow, Edinburgh, Helensburgh, Oban and Fort William.
National cycling route 7 runs through Dumbarton town centre, within 100 metres of
the southern entrance of the Artizan Centre. There are a number of local bus routes
which traverse the town centre together with services to Glasgow. A variety of bus
stops are available including a bus stop just outside the Artizan Centre next to the
site. It is clear that the development will be accessible from a wide variety of location
and by means other than the private car. The proposed residential properties will also
Page 36

Page 37

embrace the 20 minute neighbourhood concept given their central location adjacent
to a wide range of local services and transport links. 
7.58 The Council’s Roads Service have offered no objections to the principle of the
proposed development and suggested conditions relating to servicing and parking for
each of the components. Servicing and parking will require to be assessed in relation
to National Roads Design Guide and West Dunbartonshire Council parking standards
applicable at the time of subsequent applications for AMSC. Green and Active Travel
Plans are also recommended at the detailed stage with any amendments to adopted
areas requiring to be clarified. Should any stopping up or diversions or existing public
roads or footways be required, this should be progressed and confirmed under the
relevant planning legislation. A joint pre/post inspection of all publicly adopted areas
and to ensure that they are retained in their existing condition is also recommended
and all further necessary permits and permissions should be obtained prior to
commencement of any works. Full details of the construction programme and
detailed traffic management proposals should also be submitted in advance of any
works. Subject to the above matters being addressed by either planning condition or
advisory note where a planning condition is inappropriate, it is considered that the
proposal is acceptable in respect of access, parking and sustainable travel. 
Built and Cultural Heritage
7.59 As noted above, part of the application site lies within Dumbarton Town Centre
Conservation Area, and the potential impacts upon the Conservation Area are
already considered in paragraphs 7.35 and 7.36 above . A number of listed buildings
are located within the Town Centre, and in the vicinity of the application site. These
include the Category A listed St Augustine’s Episcopal Church, and the former
Dumbarton Academy Building (now Council Offices) as well as Category B listed
Glencairn House. It is not considered that the proposal has any negative impact upon
the setting of any of the listed buildings within the Town Centre and Historic
Environment Scotland offer no objection on this basis. 
7.60 Turning to archeological matters, the West of Scotland Archeology Service (WoSAS)
advise that the elements of the proposal that would require ground disturbance have
the potential to intersect with significant historic period settlement remains, should
these survive within the footprint of the areas affected. The requirement for the
implementation of a programme of archaeological works in accordance with a written
scheme of investigation is set out by WoSAS. This requirement can be addressed by
condition. 
Ecology and biodiversity
7.61 Ecological issues are considered by the applicant in a preliminary ecological
appraisal (PEA) inclusive of bat roost potential survey. No impacts in the Inner Clyde
SPA, which is some considerable distance from the site, is identified in the PEA. The
PEA notes that the area is dominated by a variety of buildings with scattered areas of
amenity grassland, broadleaf trees and poor hedgerows. The site itself is identified as
comprising primarily 1970s buildings, hardstanding, pockets of grassland, scattered
trees, poor hedging and a bed or ornamental planting. Three buildings within the site
are identified as having moderate bat roosting potential, one having low potential and
a further four having negligible potential. No trees on site were considered to have
the potential for roosting bats. It is identified that the site could support nesting birds.
Overall the habitats within the site are considered to be of low to negligible ecological
value. The Council’s biodiversity officer is content with the submission and offers no
objections in respect of ecology matters. Following the recommendations set out in
the PEA inclusive of follow up survey work prior to the commencement of
development and the protection of nesting birds can be addressed by condition. With
Page 37

Page 38

appropriate conditions, it is considered the development could progress without
impact upon ecology, biodiversity and protected species. 
7.62 The PEA also includes an outline biodiversity enhancement statement. Enhancement
measures are recommended to include plants for pollinators and wildflower meadow
planting, tree planting, green roofs, homes for birds, bees, bats and hedgehog being
incorporated into the design. The Council’s Biodiversity officer notes the approach to
biodiversity includes very suitable measures. The detail of how biodiversity
enhancement is incorporated into the final design can be addressed by condition. 
Other Matters
7.63 The Ground Investigation Report provides an insight into what constraints may exist
on this site, however the assessment is based on a limited dataset taken from a
restricted investigation. As such it has been recommended as part of the consultation
response from Environmental Health that conditions be applied regarding site
investigation. The addition of these conditions will ensure that the proposal is in
accordance with the relevant policies. An air quality assessment has been submitted
by the applicant and this concludes that the site is suitable for the proposed
development and future occupants and users will not be exposed to poor air quality.
The assessment notes that the detailed development proposals will be accompanied
by a detailed air quality assessment and this can be addressed by condition. 
7.64 In regards to the timescale for the development, Section 59 of the Town and Country
Planning (Scotland) Act 1997 (as amended) allows for five years for subsequent
planning application to be made and works started on site unless otherwise defined
by the Planning Authority. In this instance, and following discussion with the
applicant, it acknowledged and the development beyond phase 1 which is currently
on site will be dependent on securing funding together with developers or
development partners to take forward the development. With this in mind, it is
considered appropriate to allow an extended period of time for works to commence
on site following the submission of an application or applications for AMSC. In this
case, a period of eight years rather than five is considered appropriate and the
applicant has confirmed agreement with this approach. This would give the project
more certainty and allow the further stages to be completed. 
Representations
7.65 One representation was received to the application. This related to landownership
which is not in itself a material planning consideration. The landownership question
was, however, discussed with the agent and applicant for the proposal. The points
raised were addressed and an updated landownership certificate was submitted. 
8. CONCLUSION 
8.1 The proposed development seeks to tackle and address the decline of Dumbarton
Town Centre and successfully gained Levelling Up funding (now known as the Local
Regeneration Fund). It feeds into the Connecting Dumbarton project as well as the
adjacent Glencairn House project as part of this. As part of the application for
Levelling Up Funding to the UK Government in March 2021 it was stated that “The
Artizan is in long-term decline, there are too few people living in the town centre and
there is little to attract workers or visitors to spend time and money in the town centre.
Town centre regeneration is required now to improve experience, grow activity and
ensure Dumbarton’s future sustainability.” The application highlights that commercial
vacancy rates in the core town centre peaked above 30% twice in the previous 5
years. At the time of the application 40% of the floorspace of the Artizan Centre was
vacant, compared to a Scottish average town centre vacancy rate of 12%. Asking
Page 38

Page 39

rents for retail property fell from £16 per sq. ft in 2014, to £10 in 2021. This reflected
two issues, first the quality and attractiveness of commercial property, and second, a
significant oversupply of commercial property, particularly retail, in the town. The
2021 Levelling Up Funding application also states that there are high levels of
deprivation with Dumbarton West being in the top half of deprivation indices across
Scotland. Low incomes and restricted housing availability are the main deprivation
factors affecting the area. Education and health indicators are also low while crime
indices across much of the town centre are high. These inhibit investment in
premises, limit consumer demand and influence the nature of public and private
services and the facilities required to sustain a successful town centre economy. 
8.2 The site is partially within the ‘Clyde Mission’ area, identified as one of eighteen
National Developments with National Planning Framework 4 which recognises that
significant land assets are under-utilised across the Clyde, and that longstanding
inequality, in relation to poor environment and health outcomes require to be tackled
as a national priority. The Clyde Mission designation aims to repurpose and
reinvigorate vacant and derelict land as well as adapting the area to the impacts of
climate change, where nature-based solutions would be particularly supported. 
8.3 A housing emergency was declared by West Dunbartonshire Council on the 1st of
May 2024 amid unprecedented pressures on the ability to meet the needs of those in
social housing or seeking a Council property. At the time the housing emergency was
declared there were over 5,500 households on the Council’s housing waiting lists,
274 people living in temporary accommodation and over 1,000 homeless
assessments being carried out. 
8.4 The intent of Policy 27 of NPF4 is to encourage, promote and facilitate development
in our city and town centres, recognising they are a national asset. This will be
achieved by applying the Town Centre First approach to help centres adapt positively
to long-term economic, environmental and societal changes, and by encouraging
town centre living. Policy 27 specifically supports development proposals for
residential development within town centres including new build developments. Policy
9’s intent is to encourage, promote and facilitate the reuse of brownfield, vacant and
derelict land and empty buildings, and to help reduce the need for greenfield
development. Policy 16’s intent is to encourage, promote and facilitate the delivery of
more high quality, affordable and sustainable homes, in the right locations, providing
choice across tenures that meet the diverse housing needs of people and
communities across Scotland. 
8.5 The Artizan Centre is an existing shopping centre which makes up a large proportion
of Dumbarton Town Centre. It has been demonstrated through the successful
Levelling Up Fund application that the Centre is in decline and that the provision of
the current level of retail within the town centre is no longer viable and this is to the
detriment of the wider town centre. Given that the current provision of retail is no
longer sustainable, it leaves to be considered what other acceptable uses the land
within the town centre could accommodate. Guided by Policy 27, the proposed uses
of housing, a health centre together with restaurants, cafes, hot food takeaways,
public houses, offices, leisure outdoor space and public realm works are in line with
the Town Centre first approach and will bring renewed vitality to the town centre
which is identified as a national asset both in its context as a Town Centre but also as
partially within a Clyde Mission area. It is acknowledged that the site is not identified
as housing site, however, given that the last adopted Local Plan was adopted in
2010, some 16 years ago, it does not reflect an up-to-date position and much has
changed in these 16 years. The Artizan Centre is however highlighted as a
development priority within the more recent proposed LDP2. Given the current
Page 39

Page 40

housing crisis and the decline of the town centre, it is on balance considered that the
principle of the development is therefore acceptable. It is also considered that an
appropriate design and could be achieved which would positively contribute to the six
qualities of successful places and bring a sense of renewal to the wider town centre.
The appropriate conditions, the site could also be developed without detriment to
residential amenity, built heritage, traffic and parking and ecology. 
8.6 Notwithstanding the strong support for the development as set out above, it is
acknowledged that the site is at risk of coastal flooding, as is approximately two thirds
of the defined town centre of Dumbarton. The intent of Policy 22 of NPF4 is to
strengthen resilience to flood risk by promoting avoidance as a first principle and
reducing the vulnerability of existing and future development to flooding. It is further
acknowledged that SEPA have objected in principle to the proposal under their duty
under Section 1 of the Flood Risk Management (FRM) (Scotland) Act 2009 to reduce
overall flood risk and promote sustainable flood risk management. SEPA’s response
relates solely to flood risk ad no other comments on the relative merits of the
development and SEPA recognise that consideration of other policy elements and
circumstances is a matter for the Planning Authority. This is reflected in the Chief
Planners letter as set out in paragraph 7.50 above that it falls to the Planning
Authority to consider all policies and material considerations to reach a balanced
planning conclusion. The applicant has undertaken significant work to demonstrate
that the full flood risk of the site is understood and, despite the objection, SEPA
accept that it is understood. In this case it can be concluded that the flood risk is fully
understood, the Council’s Roads Service does not object to the proposal, that
flooding of this area is coastal flooding and therefore highly predictable and also that
there are mitigation measures which can be undertaken as set out in paragraph 7.49
above. 
8.7 Overall, the development draws strong support from many development plan policies
and also falls into the Clyde Misson National Development. It will have significant
benefits to the town centre in redeveloping underused and vacant brownfield land,
the creation of quality homes and town centre living, the overall vitality, viability and
economic prosperity of the town centre and a significant benefit to placemaking and
the overall quality of the appearance of the town centre together with providing an
attractive place and destination to visit. Whilst fully acknowledging the concerns set
out in the objection from SEPA, in considering the development plan as a whole
together with the nature of the flood risk and its predictability, and the mitigation
measures that can be incorporated into the final design and operation of the site, it
can be concluded that the development can be considered acceptable despite being
contrary to Policy 22 of NPF4. It is therefore recommended that Planning Permission
in Principle be granted. 
9. CONDITIONS 
1. The development to which this permission relates must be commenced no later than
eight years from the date of this permission. 
Reason: To be in compliance with Section 59(2A) (b) of the Town and Country
Planning (Scotland) Act 1997, as amended 
2. That prior to the submission of the first application for the approval of matters
specified by condition, a detailed phasing plan for the entire application site showing
the relevant phases and anticipated timescales for the development of each phase,
and the inter-relationship of the phases shall be submitted for the further approval of
the Planning Authority. All applications for the approval of matters specified by
Page 40

Page 41

condition shall thereafter either demonstrate compliance with the agreed phasing
plan or include an updated phasing plan for approval. Development shall at all times
proceed in accordance with the most up-to-date approved phasing plan unless
otherwise first agreed in writing by the Planning Authority. 
Reason: To ensure the appropriate phasing for the comprehensive delivery of the
development of the site. 
3. No development shall commence within any phase of the development until such
time as approval of the detailed design, layout and other matters associated with that
development phase, (hereinafter called "the matters specified in conditions") has
been granted by the Planning Authority. These matters are as follows: 
a. the siting, design, external appearance and external materials of all buildings and
other structures, including floor plans and elevations. Full specifications of all
materials must be submitted and samples submitted to the Planning Authority on
request. the means of access to, and layout of, the site, including car parking
provision inclusive of disabled bays, and the provision of electric vehicle
charging, cycle parking provision and servicing arrangements in so far as is
required.
b. the details of, and timetable for, the implementation of the hard and soft
landscaping for the site, including details of maintenance arrangements. 
c. full details of the design and location of all boundary walls and fences.
d. details of existing and proposed site levels and site sections.
e. details of flood mitigation measures.
f. the provision of surface water drainage works incorporating Sustainable Drainage
Systems (SuDS). For the avoidance of doubt, the submitted details shall be in
accordance with CIRIA C753, the SUDS Manual and Sewers for Scotland This
shall also demonstrate that all surface water is intercepted within the site.
g. the disposal of sewerage. 
h. details of the storage and collection of waste and recycling from the development.
i. detailed information on biodiversity enhancement measures to be incorporated
into the development. 
j. details of tree protection during the construction phase.  
k. full details of the incorporation of low and zero carbon infrastructure into the
development. 
l. an updated noise impact assessment specifically considering the detail of the
development comprising that phase and any required noise mitigation measures
shall be submitted.
m. an updated air quality assessment specifically considering the detail of the
development comprising that phase and any required air quality mitigation
measures shall be submitted. 
n. a detailed report on the extent, scale and nature of any contamination for each
development parcel/phase shall be carried out with a detailed remediation
strategy and implementation plan detailing the measures necessary to bring the
site to a condition suitable for the intended use.
o. A Green and Active Travel Plan. 
Reason: In order to ensure that the development is of an acceptable appearance and
character and that all associated technical issues are addressed. 
4. That as part of the first application for matters specified by condition as required in
connection with condition 3, a site-wide water environment investigation and
assessment shall be submitted to and approved in writing by the Planning Authority.
Page 41

Page 42

The report shall be prepared by a suitably qualified person and as a minimum shall
include the following: 
a. Suitable and sufficient monitoring from across the entire site in order to
identify the extent, scale and nature of contamination with regards to the
water environment.
b. An appropriate level of assessment in accordance with current guidance that
identifies the key receptors and the significance of any pollutant linkages
found to be present. 
Should a significant pollutant linkage be identified on the site then a site wide
preliminary remedial options appraisal is to be provided that demonstrates
whereabouts on the site remediation is considered likely. Any measures identified in
the report shall be implemented as approved within a timescale agreed with the
Planning Authority. 
Reason: To protect the wider environment and to ensure that the site is suitable for
its intended use. 
5. If there is a requirement to either re-use site won material or to import material then
the assessment criteria and sampling frequency that would adequately demonstrate
its suitability for use shall be submitted to and approved by the Planning Authority
prior to any material being re-used or imported. In addition to this and in accordance
with BS3882:2015 and BS8601:2013, material to be used in the top 300mm shall
also be free from metals, plastic, wood, glass, tarmac, paper and odours. 
On completion of the works and at a time and or phasing agreed by the Planning
Authority, the developer shall submit a verification report containing details of the
source of the material and appropriate test results to demonstrate its suitability for
use. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
6. The presence of any previously unexpected contamination that becomes evident
during the development of the site shall be reported to the Planning Authority in
writing within one week, and work on the site shall cease. At this stage, if requested
by the Planning Authority, an appropriate investigation and risk assessment shall be
undertaken and a remediation scheme shall be submitted to and approved by the
Planning Authority prior to the recommencement of site works. The approved details
shall be implemented as approved. 
Reason: To protect public health and to ensure that the site is fit for its intended use. 
7. That all surface water shall be intercepted within the site both during construction and
on completion of the development. Full details of measures to ensure that surface
water run-off is contained within the site shall be submitted to and approved in writing
by the Planning Authority prior to the commencement of any works on site. The
measures shall be implemented and maintained as approved. 
Reason: In the interest of management of surface water and drainage infrastructure. 
8. Notwithstanding condition 3 above, no residential property shall be occupied until the
contents of a Travel Information Pack which encourages reduced dependency on the
private car by highlighting the location of local amenities, public transport services
Page 42

Page 43

and active travel routes is submitted to and approved in writing by the Planning
Authority. Thereafter, on the occupation of each residential property, the approved
Travel Information Pack shall be provided to new residents. 
Reason: In the interests of encouraging sustainable travel habits 
9. That unless otherwise first agreed in writing by the Planning Authority as part of any
application for maters specified by condition for any phase of the development, a
Construction Traffic Management Plan shall be submitted which shall include, but
shall not necessarily be limited to the following: 
a. A construction programme
b. details of wheel washing and road cleaning; 
c. hours of operation of site traffic; 
d. construction vehicle routes; 
e. prohibited routes; 
f. hours of deliveries; 
g. access to the site; 
h. construction traffic signage; 
i. parking locations of construction vehicles, site operatives and contractors which
shall include staff parking out with the public road. 
Thereafter, construction traffic shall be managed in accordance with the approved
arrangements at all times unless first otherwise agreed in writing by the Planning
Authority. 
Reason: To ensure all matters relating to construction traffic are managed in an
appropriate manner in the interests of road and pedestrian safety. 
10.  That unless otherwise first agreed in writing by the Planning Authority as part of any
application for maters specified by condition for any phase of the development, a
Construction Environmental Management Plan (CEMP) shall be submitted to and
approved in writing by the Planning Authority. The CEMP shall include: 
a. A site specific CEMP outlining the details of all construction works and mitigation
to be undertaken in relation to that phase together with an indicative timetable of
activities. 
a. Hours of work associated with that phase for all works and ancillary operations
(including piling) which are audible at the site boundary (or at such other place(s)
as may first be agreed in writing with the Planning Authority)
b. The hours of all delivery and other traffic arriving and leaving the site. 
c. A site waste management plan (dealing with all aspects of waste produced
during the construction period) 
d. Details of the formation of the construction compound, welfare facilities,
materials storage areas and stockpiles, car parking, compound lighting and
boundary fencing
e. A drainage management strategy for the site and a detailed drainage
f. management plan, addressing the management of surface, ground and
wastewater arising during construction. This shall demonstrate that all surface
water is intercepted within the site during the construction period. 
g. Details for the sewage disposal and/or treatment from onsite welfare facilities 
The CEMP for each phase of the development shall thereafter be implemented on
site as approved unless otherwise first agreed in writing by the Planning Authority. 
Page 43

Page 44

Reason: To ensure that construction is undertaken in an appropriate manner and to
protect the amenity of nearby residents during the construction period. 
11. No piling works shall be carried out until a method statement has been submitted to
and approved in writing by the Planning Authority. This statement shall include an
assessment of the impact of the piling on surrounding properties, taking into account
the guidance contained in BS 6472-1: 2008 'Evaluation of Human Response to
Vibration in Buildings'. It shall detail any procedures which are proposed to minimise
the impact of noise and vibration on the occupants of surrounding properties. This
statement shall be prepared by a suitably qualified person, and the piling works shall
thereafter be carried out in accordance with the approved method statement. 
Reason: To minimise noise and disturbance to neighbouring residents/occupants
during construction. 
12. Unless otherwise approved in writing by the Planning Authority, no development shall
commence on site until such time as a scheme for the control and mitigation of dust
has been submitted to and approved in writing by the Planning Authority. The
scheme shall identify likely sources of dust arising from the development or its
construction and shall identify measures to prevent or limit the occurrence and
impact of such dust. The approved scheme shall thereafter be implemented fully prior
to any of the identified dust generating activities commencing on site and shall be
maintained thereafter, unless otherwise approved by the Planning Authority. 
Reason: To minimise the occurrence of dust, in the interests of the amenity of the area. 
13. That as part of the first application for matters specified by condition as required in
connection with condition 3, full details of the implementation of a programme of
archaeological works in accordance with a written scheme of investigation be
submitted for consideration by the Planning Authority in consultation with the West of
Scotland Archaeology Service. Thereafter the developer shall ensure that the
programme of archaeological works is fully implemented as agreed and that all
recording and recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority in agreement with the West of
Scotland Archaeology Service. 
Reason: In the interests of the recording of antiquity. 
14. All recommendations set out in Chapter 5 of the Preliminary Ecological Appraisal
Report dated 21st February 2024 shall be followed to the satisfaction of the Planning
Authority inclusive of the requirement for further survey work as may be required to
inform any future application for approval of matters specified by condition under
condition 3 above. 
Reason: In the interests of the protection of biodiversity. 
15. Prior to the occupation of the first residential property within the site, the developer
shall install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network, where
available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
Reasons: In the interests of providing effective telecommunications connections. 
Page 44

Page 45

Michael Mulgrew
Planning, Building Standards and Environmental Health Manager 
Date: 3rd June 2026 
Person to Contact: Michael Mulgrew, Planning & Building Standards Manager 
Email: Michael.Mulgrew@west-dunbarton.gov.uk   
James McColl, Development Management Team Leader 
Email: James.McColl@west-dunbarton.gov.uk  
Appendix: Location Plan   
Background Papers: 1.  Application forms and plans 
2.  Representation 
3.  Consultation responses 
4.  National Planning Framework 4 
5.  West Dunbartonshire Local Plan 2010 
6.  Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended 
7. Creating Places Guidance (2022) 
8. Green Network and Green Infrastructure
Supplementary Guidance (2022) 
9. Dumbarton Town Centre Conservation Area Appraisal 
10. Historic Environment Policy for Scotland 
11. Historic Environment Scotland Managing Change in
the Historic Environment Guidance Notes on Setting,
External Walls and Shopfronts 
Wards affected: Ward 3 (Dumbarton) 
Page 45

Page 46

West Dunbartonshire Council
16 Church Street
Dumbarton
G82 1QL 
Reproduced by permission of Ordnance Survey on
behalf of HMSO. (C) Crown copyright and database
right 2025. All rights reserved. West Dunbartonshire
Council OS License Number AC0000818098 
Date: 20 May 2026 
DC24/108/PPP  Erection of residential-led
(Class 8, Class 9 and sui
generis) mixed use
development including
Class 1A (Retail), Class 3
(Restaurants and cafes),
sui generis hot food
takeaways/public houses,
Class 4 (Office), Class 10
(Non-residential
institutions) and Class 11
(Leisure) with associated
outdoor space and public
realm works, access,
landscaping, parking and
infrastructure. 
Artizan Centre
College Way
Dumbarton 
Page 46

Page 47

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Resources 
Council: 17 June 2026
Subject: Financial Update 
1. PURPOSE
1.1 To provide an update on the financial challenges facing the Council and the
estimated 2027/28 – 2031/32 revenue budget gaps. 
1.2 This is the first financial update since the 2026/27 budget was set on 4 March
2026 and rolls forward previous estimates as well as updating assumptions.
The assumptions will continue to be refined as the financial year progresses.
2. RECOMMENDATIONS
2.1 Members are asked to note the updated position regarding projections for the
Council’s estimated revenue budget gaps in 2027/28-2031/32, particularly the
updated estimated mid-range 2027/28 budget gap of £10.005m.
3. BACKGROUND
3.1 On 4 March 2026, the Council agreed a balanced 2026/27 revenue budget, a
revised capital budget and revenue estimates for 2027/28-2030/31. That
budget report highlighted estimated future year budget gaps based on a range
of assumptions including future Scottish Government funding, inflation and
future interest rates. The consequences of the decisions taken by Council on 4
March to agree a balanced 2026/27 budget reduced the cumulative estimated
future budget gap in the mid-range as set out in Exhibit 1.
Exhibit 1 – Future Year Estimated Cumulative Budget Gaps (Mid-Range  
4 March 2026 Budget
Budget Gap 27/28
£000
28/29
£000
29/30
£000
30/31
£000
Mid-Range Gap Before Council Decisions 16,401 31,027 40,897 49,826
Management Adjustments (775) (775) (775) (775)
Saving Options (2,586) (2,888) (2,888) (2,888)
Council Tax Increase (3,541) (3,541) (3,541) (3,541)
HSCP Funding 1,140 1,140 1,140 1,140
West Dunbartonshire Leisure Pay 234 234 234 234
Council Growth Items 32 32 32 32
Mid-Range Gap After Council Decisions 10,905 25,229 35,099 44,028
ITEM 9
Page 47

Page 48

4. MAIN ISSUES
4.1 Since the budget was agreed on 4 March 2026, a further year has been
added to the budget outlook to take it to 2031/32 and the key assumptions
and cost pressures detailed in the Council Budget paper have been revisited.
This is summarised in the paragraphs below.
4.2 Scottish Government Finance Settlement
The 4 March 2026 report advised that assumptions in relation to future year
Scottish Government funding were for a flat cash assumption.  This being
based on the Scottish Government three-year spending review which
illustrated that local government funding is expected to decrease slightly
(0.07%) over the three-year period 2026/27-2028/29.  On that basis I am
assuming: 
• Best Case – 0.5% increase
• Mid-Range – Flat Cash
• Worst Case – 0.5% decrease 
Future Scottish Government funding levels is one of the key assumptions
within the Finance Update. While it is considered good practice to prepare
longer term financial plans it is challenging to do so with great accuracy due to
single year Scottish Government finance settlements.
4.3 Changes to Base Budget
There has been one change to the Council’s base budget since the 4 March
2026 Budget report to Council.
4.4 Base Budget Adjustment 1 – Estimated Reduction in Strathclyde
Pension Fund Contributions (£1.800m Favourable)
The next formal actuarial valuation of the Strathclyde Pension Fund will be
carried out as at 31 March 2026 and reported in 2027. This will establish 
contribution requirements for the subsequent 3-year period. Based on the
reported funding position in relation to the Fund it is anticipated the
contribution rate will decrease from the 17.5% currently budgeted for.
However, this is not certain and will depend on the valuation.  I have assumed
no change in the worst-case scenario, a reduction to 15% in the mid-range
scenario (£1.800m) and a reduction to 13% in the best-case scenario
(£3.400m). These estimates will be updated throughout the year as more
information becomes available.
Cost Pressures
4.5 Generally services work on the basis of having to contain any cost pressures
Page 48

Page 49

within current resources, however, there are cost pressures which are
unavoidable and need to be factored into future budget processes. There has
been two new cost pressures identified since the 4 March 2026 Budget report
to Council.
4.6  Cost Pressure 1 – Loan Charges (£0.600m Adverse)
The finance team update their estimates for loan charges on an annual basis
(usually in October) to ensure future budget estimates are based on the most
up to date projections of future interest rates and the Council’s borrowing
requirements (linked to the capital plan). This exercise will be carried out in
October 2026 with the outcome reported to Council in December however it is
already evident that interest rates are not decreasing at the rates previously
predicted with geopolitical issues in the Middle East being a key reason.  On
that basis a prudent measure has been taken to create a £0.600m cost
pressure at the current time which can be adjusted after the October review is
conducted.
4.7 Cost Pressure 2 – General Services Bad Debt Provision (£0.300m Adverse)
Finance has carried out a review of the provision for anticipated bad debt
which has concluded there is insufficient budget available for it.  The need to
add £0.300m is not a consequence of a sudden increase in bad debt but more
of a cumulative impact of bad debt increasing over a number of years.  This
cost pressure is required to right size the budget to reflect that cumulative
impact.
Employee Costs
4.8  There have been no changes to assumptions about the extent to which the
Council will need to fund future pay awards.  For 2027/28 a planning
assumption of the Council having to fund 3% of any pay award has been
applied in the best case and mid-range scenarios (already built into the
estimated budget gap), with 4% assumed in the worst-case scenario. Each 1%
over 3% would increase the gap by a further £1.869m.
Revised Mid-Range Estimated Budget Gap
4.9  Exhibit 2 sets out the revised cumulative estimated budget gap in the range for
2027/28 to 2031/32. Exhibit 2 illustrates that, in the mid-range scenario the
Council are faced with a budget gap of £10.005m in 2027/28 rising
cumulatively to £52.161m in 2031/32.
Page 49

Page 50

Exhibit 2 – Revised Mid-Range Estimated Budget Gaps (Cumulative  
Para 
Ref
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
2031/32
£000
Budget Gap 5 March 3.1 10,905 25,229 35,099 44,028 53,061
Reduction in Pension
Contributions 4.4 (1,800) (1,800) (1,800) (1,800) (1,800)
Loan Charges 4.6 600 600 600 600 600
Bad Debt Provision 4.7 300 300 300 300 300
Revised Budget Gap  10,005 24,329 34,199 43,128 52,161 
Best Case / Mid-Range and Worst Case Analysis
4.10 There are three material assumptions in the current budget gap forecast set out
in Exhibit 2 which will have a material impact on the forecast gap if the
assumptions prove to be materially different from what transpires. These are:
• Para 4.2 - Each 0.5% change to local government settlement would change the
settlement by £1.336m
• Para 4.4 – Impact of pension reduction to 15% not happening (add £1.800m to
gap) or further decreasing to 13% (saving of £1.600m)
• Para 4.8 – Impact of Council contribution to pay awards increasing from 3% to
4% in worst case scenario (increase gap by £1.869m)
Exhibit 3 sets out a best case, mid-range and worse case analysis for these
three assumptions.
Exhibit 3 – Best Case, Mid-Range and Worst-Case Summary
Scenario 2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
2031/32
£000
Best Case 7,069 21,393 31,263 40,192 49,225
Mid-Range 10,005 24,329 34,199 43,128 52,161
Worst Case 13,212 27,536 37,406 46,335 55,368
Other Issues 
2027/28 Budget Process
4.11 Given the scale of the financial challenge facing the Council in 2027/28 and
future years, it is important that early progress is made to identify saving
options with momentum on this maintained between now and setting the
Page 50

Page 51

budget in March 2027. The Senior Leadership Team will shortly commence this
process and continue to meet periodically to develop saving options which will
be presented to members for their consideration at an appropriate time.
4.12  Health and Social Care Partnership Requisition
The Council, at the budget meeting on 4 March 2026, agreed an HSCP
requisition of £97.736m. There is a working assumption that the future
allocation to the HSCP is on the basis of ‘flat cash’ plus the appropriate share
of the Health & Social Care funding commitments made by the Scottish
Government. However, this is only an assumption and the HSCP requisition
will be a matter for Council to consider as part of the budget process.
4.13 Council Tax 
The estimated budget gap makes no assumption over future Council Tax
increases as setting Council Tax is subject to a political decision when
agreeing the budget in March 2027. However, by means of illustration a 10%
Council Tax increase would generate an additional £4.980m and increase the
weekly bill for a Band D taxpayer by £3.23 (assuming they are liable for the
full Council Tax charge). 
4.14  Fees and Charges
In 2026/27 an increase of 5% was applied to fees and charges. The current
assumption built into the estimated future budget gaps is an annual increase
of 5% in all three scenarios (best case, mid-range and worst case). Every 1%
increase beyond 5% would generate an estimated £0.057m in revenue.
5. PEOPLE IMPLICATIONS
5.1 None directly from this report but there is a strong link between HR and
budgets. 
6. FINANCIAL AND PROCUREMENT IMPLICATIONS
6.1 Sets out the estimated revenue budget gaps in 2027/28 to 2030/31. There are
no direct procurement implications arising from this report.
7. RISK ANALYSIS
Page 51

Page 52

7.1 None directly from this report but any proposals to address the
estimated budget gap will need to consider risk.
8. EQUALITIES IMPACT ASSESSMENT (EIA)
8.1 None directly from this report but any proposals to address the
estimated budget gap will need to consider equality issues.
9. CONSULTATION
9.1 The views of all Chief Officers have been requested on this report and
feedback incorporated herein.
10. STRATEGIC ASSESSMENT
10.1  Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s Strategic Plan.
10.2  The General Services revenue budget contributes to all categories by
providing funding in specific areas to help the Council achieve and develop
these priorities.
Laurence Slavin
Chief Officer - Resources
Date: 01 June 2026
Person to Contact: Laurence Slavin, Chief Officer - Resources
E-mail: laurence.slavin@west-dunbarton.gov.uk 
Background Papers
Budget Report to Council - 4 March 2026
Page 52

Page 53

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 17 June 2026
___________________________________________________________________ 
Subject: General Services Revenue Budgetary Control Report to 31 March 2026
(Draft Outturn) 
1. Purpose 
1.1 The purpose of this report is to advise Council on the draft outturn position of
the 2025/26 Revenue Budget and the level of the General Fund Reserve as at
31 March 2026. 
2. Recommendations 
2.1 Council is asked to: 
I. note the overall favourable variance (underspend) on the General Fund
Revenue Budget of £7.236m, an improvement in forecast of £4.090m since
last reported (£3.146m). 
II. note a projected favourable variance (underspend) on the General Services
Delivery Budget of £1.797m (0.60% of total budget), an improvement in
forecast of £2.108m since last reported (£0.311m adverse at period 10). 
III. note a projected in-year use of earmarked reserves of £3.027m, offset by a
transfer in of £8.439m to earmarked reserves and a transfer from
unearmarked reserves of £1.173m thus increasing the overall forecast
earmarked balance to £15.406m.   
IV. approve the transfer from free reserves of £2.260m to the Early
Severance/Voluntary Early Retirement Reserve and £1.180m to the
Smoothing Fund. 
3. Background 
3.1 The revised 2025/26 revenue budget presented to Council in March was
£313.821m.   
4. Main Issues 
Service Delivery Position 
4.1 The summary report at Appendix 1 highlights a projected favourable variance
(underspend) against General Services Delivery of £1.797m (0.60% of the
total budget) and an overall favourable variance of £7.236m. This represents
a £4.090m improvement in the position reported at P10. This is detailed in the
table below.  Appendix 2 provides more detailed service reports by Chief
Officer, with explanations for the overspend provided in Appendix 3.
ITEM 13
Page 53

Page 54

£m £m
Variance at Period 10  (3.146) 
Movement in Variance  
Resources:
• Adverse variance due to an increase in iWorld
Other favourable variances across the service
• Favourable variance throughout service due to
vacancies 
0.120 
(0.125)  (0.005)
Regulatory & Regeneration:
• Increase in income within Licensing & planning   (0.227)  (0.227)
People & Technology:
• Favourable variance in Information Services
due to phased telephony migration and ISDN
transition to BT, alongside lower software costs
from the M365 renewal and savings on printer
leases and copies.
• Favourable variance in Strategic People and
Change mainly due to decreased cost of
Occupational Health
• Favourable variance across employee costs  
(0.147) 
(0.067) 
(0.029)      (0.243) 
Education:
• Favourable variance Specialist Education
Provision due to reduction in transport recharge
and lower inter-authority placement expenditure
• Favourable variance Primary & Secondary
schools due to recharge to Early years for
shared campus facilities 
• Adverse Early Education due to higher than
anticipated net cross-boundary charges and
employee costs slightly greater.
• PPP Favourable variance due to reduction in
banked hours payment
• Favourable variance Education Development
as a result of no year end recharge to
Counselling for a principal teacher following
retirement
• Favourable variance across other service areas 
(0.621) 
(0.126) 
0.230 
(0.067) 
(0.077)   
(0.028)  (0.689)
Roads & Neighbourhood:
• Reduction in Waste Collection costs
• Adverse Grounds Maintenance and Street
Cleaning as a result of less income due to
changes in programme of works 
• Favourable variance Roads Services due to
vacancies and additional income from the
service undertaking additional work for internal 
(0.270) 
0.112 
(0.246)  
Page 54

Page 55

services 
• Other adverse variance mainly as a result of
under recovery of income 
0.029  (0.433)
Miscellaneous Services:
• Underspend on unfunded pension costs &
apprenticeship levy
• Underspend on empty property costs
• Underspend on payments to other bodies
• Procurement savings not achieved
• Increase in the Provision for Legal Fees 
(0.183) 
(0.176)
(0.229)
0.435
0.450  0.297
Requisitions:
• Underspend on VJB requisition  (0.053)  (0.053)
Citizens, Culture and Facilities: 
• Additional payment to WDLT for Skypoint
Security  
• Lower income from Early Years (Catering &
Building Cleaning)
• Misc Employee Costs 
0.047 
0.048
0.015  0.110
Housing and Employability: 
• Additional income received for resettlement    (0.866)  (0.866)
Total Movement in Service Delivery variance     (2.109)
Non Service Budgets:
• Underrecovery of central support costs due to
reduced staff costs in the Central Support
model due to the temporary reduction in
pension costs.
• Application of the general capital grant to
absorb the principal cost of loan charges where
statutory mitigation allows. 
0.102   
(1.561)  (1.459)
Total Movement in Non-Service Budget  (1.459)
Income:
• Additional Council Tax Income  (0.522)  (0.522)
General Fund variance on outturn at Period 12  (7.236) 
4.2 Information on any projected annual variances in excess of £0.050m after the
use of earmarked reserves, are highlighted and noted within Appendix 3. 
Earmarked Reserve Position 
4.3 During 2025/26, services made use of £3.027m of earmarked reserves
(Period 10: £2.601m).  Information on the earmarked reserve spend and
transfers in are shown in Appendix 4.  Appendix 4 has been updated to reflect
decisions agreed by Council on 4 March 2026, including earmarking of
reserves to balance the 2026/27 budget and agreed use of the Cost of Living
Fund. 
Page 55

Page 56

4.4 Appendix 5 shows the latest position in respect of Unallocated and Earmarked
Reserves following the budget agreed on 4 March 2026 and shows the (draft)
balance as at 31 March 2026. This is summarised in the table below. 
Unearmarked
Balance 
(£m)
Earmarked
Balance 
(£m)
Total General
Fund
Reserves
(£m)
As at 31 March 2025  3.451 8.821 12.272
In-year service use of
reserves                     
0 (3.027) (3.027)
Transfer to EMR 0 8.439 8.439
Transfer to/(from) general
reserve
7.236 0 7.236
Total In-year movement
as at Period 12
10.687 14.233 24.920
Transfer to/(from) reserves (1.173) 1.173 0
Balance as at 31 March
2026
9.514 15.406 24.920 
4.5 At the budget setting meeting on the 6 March 2024 the decision was taken to
use £3.077m of the Early Severance/Voluntary Early Retirement Reserve
(ER/VER) temporarily to balance the budget which was to be replenished in
future years.  In 2025/26 the ER/VER Reserve was replenished by £1.192m. 
Therefore it is proposed to top up the ER/VER Reserve with a further
£1.885m plus an additional £0.375m to provide resilience in future years. This
increase of £2.26m is equivalent to twice the amount charged to the reserve
during 2025/26. 
4.6 A £6m Smoothing Fund was created in 2022/23 for a three year service
transformation programme to provide time to implement approved savings
options.  At the budget setting meeting on 1 March 2023 Council agreed to
use £3m of the Smoothing Fund to balance the budget.  Over the past three
years an average of £0.785m per year has been used leaving a residual
balance of £0.654m in the reserve.  Further savings will be required in future
years to balance the budget and it is proposed to top up the balance by
£1.180m to provide continued support to provide time to implement savings. 
4.7 If the top up of the ER/VER reserve and the Smoothing Fund are approved
then the Earmarked Reserve Balance would increase to £18.846m and the
Unearmarked balance would decrease to £6.074m.  This is £0.605m over the
prudential target agreed on 4 March 2026 of £5.469m. 
Monitoring of Efficiencies 
4.8 A list of agreed efficiencies and management adjustments totalling £6.017m is
shown within Appendix 6.  The appendix indicates that £5.513m was
achieved.  However, Appendix 6 also shows that £0.504m was not achieved
and was funded in year by the smoothing fund.
Page 56

Page 57

5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the projected in-year financial position for the General
Services revenue budget. 
8. Risk Analysis 
8.1 The 25/26 outturn is presented as draft and may change as a result of the
audit of 25/26 financial statements. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report. 
11. Consultation 
11.1 All services involved in delivering the revenue and capital budgets have been
consulted in the compilation of this report. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the strategic
priorities of the Council’s current Strategic Plan. This report forms part of the
financial governance of the Council. 
__________________
Laurence Slavin
Chief Officer – Resources
Date: 02 June 2026
__________________________________________________________________
Person to Contact: Carol Alderson. Finance Manager 
Council Offices, Church Street, Dumbarton  
E-mail: carol.alderson@west-dunbarton.gov.uk
Page 57

Page 58

Appendices: Appendix 1 - Revenue Budgetary Control 2025/26 
– Corporate Summary; 
Appendix 2 -  Revenue Budgetary Control 2025/26
– Chief Officer Summaries;
Appendix 3 - Analysis of Revenue Variances over 
£50,000; 
Appendix 4 -  Monitoring of Earmarked Balances 
Appendix 5 -  Reconciliation of General Fund Reserves
Appendix 6 - Monitoring of Efficiencies 
Background Papers: 
• Ledger output – Period 12;
• General Services Revenue Estimates 2025/26   
Wards Affected           All Wards 
Page 58

Page 59

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
REVENUE BUDGETARY CONTROL 2025/26
SUMMARY
PERIOD END DATE 31 March 2026
Total Budget Actual Spend Use of Earmarked
Reserves
Variance after
the use of
Earmarked
Reserves
Annual RAG
Status
£000 £000 £000 % £000 £000
Resources 4,880 6,544                        1,664 34.1% 663 1,001 
Regulatory and Regeneration 5,213 4,893                        (320) -6.1% 218 (538) 
People & Technology 10,460 10,135                      (325) -3.1% 15 (340) 
Citizens, Culture and Facilities 18,776 19,029                      253 1.3% 240 13 
Education, Learning and Attainment 138,396 138,842                    446 0.3% 359 87 
Roads and Neighbourhood 18,125 18,099                      (26) -0.1% 347 (373) 
908 (227) (1,135) -125.0% 0 (1,135) 
Miscellaneous Services 7,920 8,645                        725 9.2% 1,184 (459) 
Requisition (VJB) 880 827                           (53) -6.0% 0 (53) 
Requisition (SPT) 1,611 1,611                        (0) 0.0% 0 0 
Requisition (HSCP) 94,103 94,103                      (0) 0.0% 0 0 
General Services Delivery sub-total 301,272 302,501 1,229 0.4% 3,027 (1,797) 
Non-Service Budgets
Loan Charges 16,708 11,657                      (5,051) -30.2% 0 (5,051) 
Suspense Transfer to Reserves 0 (3,062) (3,062) 0.0% (3,062) 0 
Transfer to Reserves re SPFO reductions 4,294 (408) (4,702) -109.5% (4,702) 0 
Non GAE Allocation (8,453) (7,701) 752 -8.9% 0 752 
Non-Service Budget sub-total 12,549 486 (12,063) -96.1% (7,764) (4,299) 
Total Expenditure 313,821 302,987 (10,834) -3.5% (4,737) (6,096) 
Council Tax (45,426) (45,949) (523) 1.2% 0 (523) 
Revenue Support Grant (175,591) (176,208) (617) 0.4% 0 (617) 
Non Domestic Rates (84,737) (84,737) 0 0.0% 0 0 
Central Government Funding (1,672) (2,347) (675) 40.4% (675) 0 
Use of reserves (6,395) (6,395) 0 0.0% 0 0 
Total Resources (313,821) (315,636) (1,815) 0.6% (675) (1,140) 
Net Expenditure (0) (12,649) (12,648) 0.0% (5,412) (7,236) 
Department Summary Variance
Housing and Employability
General Services Delivery
Page 59

Page 60

Page 60

Page 61

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
RESOURCES SUMMARY
PERIOD END DATE 31 March 2026
Total
Budget Actual Spend Use of Earmarked
Reserves
Variance after the use
of Earmarked
Reserves
Annual
RAG Status
£000 £000 £000 % £000 £000
291 195 (96) -33% 0 (96) 
1,538 1,521 (17) -1% 32 (49) 
2,201 2,188 (13) -1% 0 (13) 
2,424 3,019 594 25% 427 167 
437 436 (1) 0% 0 (1) 
(29) (68) (39) 138% 0 (39) 
(1,072) (905) 167 -16% 0 167 
1,195 1,193 (1) 0% 0 (1) 
(2,050) (980) 1,070 -52% 204 866 
(55) (56) (1) 2% 0 (1) 
4,880 6,544 1,663 34% 663 1,001 
Variance
Service Summary
Service / Subjective Summary
Finance Service Centre
Audit
Revenues & Benefits
Total Net Expenditure
Finance
Cost of Collection of Council Tax
Cost of Collection of Rates
Rent Rebates & Allowances
Corporate Asset Maintenance
Office Accommodation
Corporate Assets
Page 61

Page 62

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
REGULATORY AND REGENERATION SUMMARY
PERIOD END DATE 31 March 2026
Total
Budget Actual Spend Use of Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
Annual
RAG Status 
£000 £000 £000 % £000 £000
1,609         1,556             (53) -3% 0 (53) 
575            458                (117) -20% 0 (117) 
(221) (275) (54) 25% 0 (54) 
885 850 (35) -4% 0 (35) 
557            505                (52) -9% 218 (270) 
605            622                18 3% 0 18 
Economic Development 1,204         1,178             (26) -2% 0 (26) 
5,213         4,893             (320) -6% 218 (538) 
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Procurement
Democratic and Registration Service
Legal Services/Trading Standards
Licensing
Environmental Health
Planning
Page 62

Page 63

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
PEOPLE AND TECHNOLOGY
PERIOD END DATE 31 March 2026
Total
Budget
Actual
Spend
Use of Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
Annual
RAG Status
£000 £000 £000 % £000 £000
902 906 4 0% 0 4 
1,863 1,806 (56) -3% 2 (58) 
5,093 4,908 (185) -4% 0 (185) 
Central Administration Support 2,602 2,502 (100) -4% 0 (100) 
0 13 13 0% 13 0 
10,460 10,135 (324) -3% 15 (339) 
Variance
Total Net Expenditure
Transactional Services
Provision for Legal Fees & Settlements
Information Services
Strategic People and Change
Service / Subjective Summary
Service Summary
Page 63

Page 64

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
CITIZENS, CULTURE AND FACILITIES
PERIOD END DATE 31 March 2026
Total Budget Actual
Spend
Use of Earmarked
Reserves
Variance after the use
of Earmarked Reserves
Annual
RAG Status
£000 £000 £000 % £000 £000
277 301 23 8% 16 7 
1,386 1,351 (35) -3% 0 (35) 
241 226 (15) -6% 0 (15) 
Clydebank Town Hall 339 331 (8) -2% 0 (8) 
Libraries 1,833 1,757 (76) -4% 0 (76) 
Arts and Heritage 306 192 (114) -37% 0 (114) 
Catering Services 5,077 5,557 480 9% 11 468 
Building Cleaning 2,080 2,110 30 1% 0 30 
Building Cleaning PPP (105) (145) (40) 38% 0 (40) 
Facilities Assistants 2,665 2,474 (191) -7% 0 (191) 
Facilities Management 455 560 106 23% 150 (44) 
Events 28 38 10 36% 0 10 
Leisure Management 4,094 4,176 83 2% 62 21 
School Crossing Patrollers 99 100 1 1% 0 1 
18,776 19,029 253 1% 240 13 
Variance
Total Net Expenditure
Citizen Services
Service / Subjective Summary
Service Summary
Communications & Marketing
Performance & Strategy
Page 64

Page 65

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
EDUCATION, LEARNING AND ATTAINMENT
PERIOD END DATE 31 March 2026
Total Budget Actual
Spend
Use of Earmarked
Reserves
Variance after the use
of Earmarked Reserves
Annual
RAG Status
£000 £000 £000 % £000 £000
Primary Schools 35,041 35,101 60 0% 0 60 
Secondary Schools 35,876 35,913 37 0% 124 (87) 
Specialist Educational Provision 23,471 23,724 253 1% 35 218 
Psychological Services 686 683 (2) 0% 0 (2) 
Sport Development / Active Schools 627 627 (0) 0% 0 (0) 
Early Education 19,346 19,729 383 2% 0 383 
PPP 18,373 18,145 (228) -1% 0 (228) 
Creative Arts 622 620 (2) 0% 30 (32) 
Curriculum for Excellence 72 72 0 0% 0 0 
Central Admin 967 1,058 91 9% 100 (8) 
Workforce CPD 289 282 (6) -2% 0 (6) 
Performance & Improvement 488 490 2 0% 0 2 
Education Development 2,539 2,398 (141) -6% 70 (211) 
138,396 138,842 446 0% 359 88 
Variance
Service Summary
Service / Subjective Summary
Total Net Expenditure
Page 65

Page 66

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
ROADS AND NEIGHBOURHOOD
PERIOD END DATE 31 March 2026
Total
Budget
Actual
Spend
Use of Earmarked
Reserves
Variance after the use of
Earmarked Reserves
Annual
RAG Status
£000 £000 £000 % £000 £000
Transport, Fleet & Maintenance Services (99) 0 99 -100% 0 99 
Roads Services 2,329 2,261 (68) -3% 150 (218) 
Outdoor Services 300 241 (59) -20% 0 (59) 
Burial Grounds (245) (201) 44 -18% 0 44 
Crematorium (1,072) (843) 229 -21% 0 229 
Waste Services 10,074 9,888 (186) -2% 0 (186) 
Depots 0 0 0 0% 0 0 
Ground Maintenance & Street Cleaning 4,799 4,797 (2) 0% 16 (18) 
Shared Prosperity Fund (0) (0) 0 0% 0 0 
Working 4 U 2,039 1,957 (82) -4% 181 (263) 
18,125 18,099 (25) 0% 347 (372) 
Service / Subjective Summary
Service Summary
Variance
Total Net Expenditure
Page 66

Page 67

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
HOUSING AND EMPLOYABILITY
PERIOD END DATE 31 March 2026
Total
Budget
Actual
Spend
Use of
Earmarked
Reserves
Variance after the
use of Earmarked
Reserves
Annual
RAG Status
£000 £000 £000 % £000 £000
Homelessness Services 837 737 (100) -12% 0 (100) 
Resettlement Services 0 (964) (964) 0% 0 (964) 
Private Sector Housing 16 17 1 6% 0 1 
Private Sector Housing Grant 43 44 1 2% 0 1 
Energy Efficiency Scotland Area Based Scheme 0 0 0 0% 0 0 
Anti Social Behaviour & CCTV 305 234 (71) -23% 0 (71) 
Housing Maintenance Trading Organisation (293) (295) (2) 1% 0 (2) 
908 (227) (1,135) -125% 0 (1,135) 
Variance
Total Net Expenditure
Service / Subjective Summary
Service Summary
Page 67

Page 68

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
REVENUE BUDGETARY CONTROL 2025/26
MISCELLANEOUS
PERIOD END DATE 31 March 2026
Total
Budget
Actual
Spend
Use of Earmarked
Reserves
Variance after the use
of Earmarked
Reserves
Annual
RAG Status
£000 £000 £000 % £000 £000
6,768 7,468        700 10% 1,184 (484) 
1,152 1,177        25 2% 0 25 
7,920 8,645        725 9% 1,184 (460) 
Variance
Total Net Expenditure
Service / Subjective Summary
Chief Executive and Chief Officers
Service Summary
Sundry Services
Page 68

Page 69

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
Audit 291 195 0 (96) 0% 
Service Description
Main Issues / Reason for Variance
Revenues & Benefits 2,424 3,019 427 167 7% 
Service Description
Main Issues / Reason for Variance
Cost of Collection of Council Tax (1,072) (905) 0 167 0% 
Service Description
Main Issues / Reason for Variance
Corporate Assets (2,050) (980) 204 866 -42% 
Service Description
Main Issues / Reason for Variance
Democratic and Registration Service 1,609 1,556 0 (53) 0% 
Service Description
Main Issues / Reason for Variance
Environmental Health 575 458 0 (117) 0% 
Service Description
Main Issues / Reason for Variance
This service provides asset and estate management
£250k adverse variance due to asset rationalisation, with property disposals that were previously
rental‑income‑generating now contributing capital receipts to the wider budget position.
The variance also now reflects £262k of Storm Eowyn damage, which cannot be absorbed within the
remaining repairs and maintenance budget due to the scale of the works.
An ongoing cost pressure of £50k has been introduced for future years due to higher property
valuation costs. Employee turnover savings are mitigating the rise in Property costs linked to last
year’s increases. The remaining overspend (£304K) relates to an under recovery of rental income. A
full review of rentals will be carried out 26/27.
The main reason for the variance is due to current levels of vacancies (£77k) and additional income
generated for environmental health services provided (£38k). The remaining variance (£2k) is due to
small variance across the service.
The service provided by this area deal with benefits, council tax and debt recovery.
The primary contributing factor is £146k relating to the Scottish Welfare Fund (SWF), which is offset
by RSG income. The majority of the variance arises from deferred income recognised within service,
as the associated commitments will not be fulfilled until FY27.
This service collects Council tax from local residents. The services also provides support and advice
to those residents regarding council tax.
The £332k FY26 bad debt provision for Council Tax has been reallocated to the service, with the
overall impact partially mitigated by the increase in statutory additions.
31 March 2026
Budget Details
Resources
Internal audit of council services.
Favourable variance arising from underspend in staffing costs due to vacant posts.
Variance Analysis
RAG Status
Regulatory and Regeneration
This services deals with the administration functions and Democratic Services within the Authority.
The main reasons for the variance is the current level of vacancies within the service (£45k). The
remaining variance (£8k) is due to various small variances across the service area.
The 3 Groups within this service (Food and Business Group, Environmental Pollution Group and
Community Health Protection Group) are responsible for all aspects of Environmental Health work.
Page 69

Page 70

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Licensing (221) (275) 0 (54) 0% 
Service Description
Main Issues / Reason for Variance
Planning 557 505 218 (270) 39% 
Service Description
Main Issues / Reason for Variance
This Service provides Building & Planning services.
The variance is mainly  due to additional income of (£144k) generated from planning applications,
and building warrants, lower employee costs than anticipated due to delays and difficulties filling
vacancies within the service (£44k). Payments to Other Bodies were (£88k) lower due to  payments
to Glasgow City Region external partners being less that expected. The remaining £6k is due to small
variances within the service.
This service provides all licensing on behalf of the Council.
The variance is mainly due to receipt of adianta income (£54k), mainly for taxi licences.
Page 70

Page 71

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Strategic People and Change 1,863 1,806 2 (58) 0% 
Service Description
Main Issues / Reason for Variance
Information Services 5,093 4,908 0 (185) 0% 
Service Description
Main Issues / Reason for Variance
Central Administration Support 2,602 2,502 0 (100) 0% 
Service Description
Main Issues / Reason for Variance
Libraries 1,833 1,757 0 (76) 0% 
Service Description
Main Issues / Reason for Variance
Arts and Heritage 306 192 0 (114) -37% 
Service Description
Main Issues / Reason for Variance
Catering Services 5,077 5,557 11 468 9% 
Service Description
Main Issues / Reason for Variance
Facilities Assistants 2,665 2,474 0 (191) -7% 
Service Description
Main Issues / Reason for Variance
This service provides the provision & protection of Arts & Heritage
There is a favourable variance against employee costs as a result of vacancies.
There is a small favourable variance against employee costs (£33k) and electricity/gas (£24k) with
the balance from additional income.
This service provides Facility Assistants throughout WDC buildings.
There is a favourable variance against employee costs as a result of vacancies.
This service area provides general ICT support to the Council and also supports transformational
change and modernisation of working practices through technology.
The favourable position reflects several factors: £57k of reduced expenditure on printer lease costs
following the transition to a new supplier; £26k lower printing and copy costs across WDC; £27k
favourable variance on ISDN transition costs; £54k favourable variance on computer software costs
driven by the M365 licence renewal; and £21k of increased budgeted recharges for computer
software to other services.
Citizens, Culture and Facilities
Catering Services across WDC
Although there is a small favourable variance against employee costs (£30k) as a result of vacancies
this has been offset by adverse variances against kitchen equipment repairs/purchases (£118k) and,
particularly, against income. The income budget was overstated and includes £350k which was also
shown within General Revenue Grant income. This was highlighted as a 2026/27 budget pressure in
the June 2025 Finance Update to Council.
Employee turnover was ahead of budget together with an uplift in recharges
This service includes the provision of Library, Culture and Museums within West Dunbartonshire
People & Technology
This service area provides strategic and operational HR advice, H&S advice and guidance (including
fire safety) and strateigc and operational risk management.
The variance was primarily driven by reduced Occupational Health expenditure of £39k, with £29k
relating to the 2025/26 burden being overstated due to the inclusion of VAT. In addition, £8k of
training costs have been carried forward to FY27 with the remaining balance across variance lines -
employee costs, events, supplies and lower Paye settlement agreement (PSA).
This services deals with administration functions within the Authority.
Page 71

Page 72

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Primary Schools 35,041 35,101 0 60 0% 
Service Description
Main Issues / Reason for Variance
Secondary Schools 35,876 35,913 124 (87) 0% 
Service Description
Main Issues / Reason for Variance
Specialist Educational Provision 23,471 23,724 35 218 1% 
Service Description
Main Issues / Reason for Variance
Mitigating Action
Anticipated Outcome
The reason for the adverse variance is an overspend on employee costs - mainly APT&C following
the recent job evaluation of grade 3 and 4 staff (£320k inc. backdating to August 2024 plus £12k for
non-achievement of turnover ) - and an overspend on transport (£567k). Payments for teachers to
cover absences (£21k) were also greater than budgeted.  Whilst the purchase of 6 additional buses
has reduced the number of taxi contracts the payback period for the one-off cost of £255k , charged
directly to the taxi budget within the service , was always projected to be more than one year.The use
of taxis will remain essential for some children given their individual needs (£136k). As a result of the
additional buses and a reduction in other internal users the recharge from Transport Services is
anticipated to be higher (£169k).These overspends are partly offset by a projected underspend on
out of authority placements (£575k) and increase staff recharges to grants and other service areas
(£129k).
Steps have been taken to reduce taxi expenditure further, with discussions ongoing with external
providers about transport of children attending those facilities. We have however taken on additional
runs required for both Riverside School and St. Mary's Duntocher, which have increased our costs. 
Discussions are ongoing with Transport Services about internal recharges, due to the reduction in
other services making use of Internal Transport
adverse variance
This service area includes all Primary Schools.
Recharges for upkeep of grounds and refuse collection were greater than budgeted resulting in an
overspend (£76k) and teacher costs were £711k overbudget as a result of payments to cover teacher
absences .In addition, supplies & services, mainly classroom materials, were over budget
(£65k).These overspends are offset by a number of underspends - gas/electricity (£273k), clothing
grants (£55k), non-teacher vacancies (£117k). Finally, there was additional income from recharges to
Early Years for shared campus property costs (£187k) and additional grant and commercial income
from early start clubs (£155k)
This service area includes all Secondary Schools.
Teacher cover costs, mainly cover, are greater than anticipated (£324k) and recharges for upkeep of
grounds were greater than budgeted resulting in an overspend (£30k). There are however a number
of underspends - gas/electricity/NDR (£79k) , lower EMA payments (£35k) , clothing grants (£45k)
and exam fees (£16k) ,and lower transport costs (especially on both SPT bus contracts and reduced
taxi usage, £132k).In addition there was greater school meal income (£123k) and favourable
variances on some miscellaneous income budgets (£10k).
This service area covers all ASN Services.
Education , Learning and Attainment
Page 72

Page 73

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Early Education 19,346 19,729 0 383 2% 
Service Description
Main Issues / Reason for Variance
The reason for the adverse variance is an overspend on employee costs (£313k) due to the Grade 3
and 4 job evaluation and the non-achievement of the turnover target. In addition, payments to private
providers are greater than budget following the sharp increase in the number of eligible 2 year olds in
these nurseries (£83k) and the net position from cross boundary charging is adverse (£30k). An
underspend against childminding (£30k) and income from pre-entitlement hours (£13k) has reduced
the overall adverse variance.
This services area includes all Early Years establishments within West Dunbartonshire.
Page 73

Page 74

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
PPP 18,373 18,145 0 (228) 0% 
Service Description
Main Issues / Reason for Variance
Education Development 2,539 2,398 70 (211) 3% 
Service Description
Main Issues / Reason for Variance
Transport, Fleet & Maintenance
Services (99) 2,261 0 99 -100% 
Service Description
Main Issues / Reason for Variance
Roads Services 2,329 2,261 150 (218) -9% 
Service Description
Main Issues / Reason for Variance
Outdoor Services 300 241 0 (59) 0% 
Service Description
Main Issues / Reason for Variance
Crematorium (1,072) (843) 0 229 -21% 
Service Description
This service covers the outdoor sporting facilities provided by WDC and public conveniences
The variance is mainly due to property costs (£79k) which is due to utiltiy costs being less than
budgeted. The remaining balance of is due to small variances across the Service.
This service provides crematorium services within the Council area
This service relates to Roads operations, design, structures, street lighting, road safety and school
crossing patrols
Employee costs are underspent by £419k due to current levels of vacancies. Property has overspend
by £46k mainly due to additional rates payments. Transport and plant overspent by £178k due to the
current vehicles on hire to ensure that planned works are undertaken and supplies and services
overspent by £290k mainly due to materials required to undertake planned works. Payments to other
bodies are underspent by £49k due to lower than anticipated payments to Greenspace which is due
to level of works carried out for them. Income has over recovered by £264k due to additional
unplanned works which were undertaken on behalf of other Services,.
Transport services across WDC.
Transport Services is operated on behalf of services across the Council. An under recovery on
income is anticipated as while the service fully allocates all costs out to appropriate services there is
currently a mis-alignment between the expenditure and income budgets. A cost pressure was agreed
at Council 17 December to rectify this from 2026/27 budget.
This service includes spend in areas such as technician service, language programmes and senior
phase programme.
The favourable variance is due to underspends on employee costs
Roads and Neighbourhood
This service area includes Vale of Leven, Clydebank High and St Peter the Apostle High Schools
and St Eunan's Primary School. The costs charged to this service are Property costs and the Unitary
charge.
The favourable variance is due to underspends on gas/electricity and a reduction in our estimate for
banked hours payment to BAM
Page 74

Page 75

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Main Issues / Reason for Variance
Employee costs are overspent by £32k due to overtime and non achievement of turnover savings.
Property costs are showing a favourable variance of £43k due to utility costs being lower than
anticipated.  Income from cremations is £231k less than budgeted partly due to a new crematorium
recently opened in East Dunbartonshire and the remainder due to number of cremations undertaken.
This budget is uncontrollable and changes throughout. The remaining balance of £9k is due to a
small variance within supplies and services.
Page 75

Page 76

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Waste Services 10,074 9,888 0 (186) -2% 
Service Description
Main Issues / Reason for Variance
Working 4 U 2,039 1,957 181 (263) -13% 
Service Description
Main Issues / Reason for Variance
Provision of Working 4U Service.
The underspend  is mainly due to employee costs as a result of achieving savings of £206,500 within
the current financial year and in year vacancies. The service received additional in year funding,
which was maximised resulting in further savings.
Waste Collection and Refuse disposal services
Employee costs overspent by £159k mainly due to turnover not being met. Supplies and services are
underspent £246k mainly due a reduction in the costs for tonnage in relation to waste collection.
Additional income of £92k was received manly due to brown bin waste permits. The remaining £8k
variance is due to small variances throughout the service.
Page 76

Page 77

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Homelessness Services 837 737 0 (100) 0% 
Service Description
Main Issues / Reason for Variance
Resettlement Services 0 (964) 0 (964) 0% 
Service Description
Main Issues / Reason for Variance
Sundry Services 6,768 7,468 1,184 (460) -7% 
Service Description
Main Issues / Reason for Variance
Loan Charges 16,708 11,657 0 (5,051) -30% 
Service Description
Main Issues / Reason for Variance
Resettlement service aims to support refugees in establishing a safe, stable and independent life
within the local community
Receipt of resettlement grant with costs incurred within other service areas.  The income has not
been reallocated as it all sits within the General Fund.
Interest and other charges on council borrowing
Loan charges are showing a £5.029m favourable variance against budget as a result of the Council’s
Finance Team, in conjunction with our Treasury Advisers (MUFG), identifying an opportunity to
terminate £33.1m of long-term fixed rate loans in return for a discounted repayment amount resulting
in a £3.4m benefit to the General Fund.  The four loans were due to mature between 2064 and 2078.
The remaining favourable variance is a result a statutory accounting adjustment to loan charges.
Miscellaneous
This service area budgets for non departmental specific costs such as pensions costs, external
grants, external audit fees and insurance costs. The service heading also holds a number of general
savings options which have still to be fully allocated e.g. procurement targets.
The main reason for this favourable variance is due to a number of underspends across the service.
An underspend on employee costs of £183k mainly due to the underspend on unfunded pension
costs and the apprenticeship levy, an underspend on empty property costs £405k and the remainder
across various other budget lines . This is offset by the increase in the provision for legal fees £450k
and procurement savings not being achieved £435k.
Other
Housing and Employability
This service seeks to prevent homelessness occurring across the authority and improves access to
support services
The service has efficiently managed its operational and commissioned budgets to delver a range of
underspends. In addition, the service has generated additional housing benefit income because
there has been an increase in the number of temporary flats.
Page 77

Page 78

WEST DUNBARTONSHIRE COUNCIL APPENDIX 3
REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
PERIOD END DATE
Total Budget Actual Spend Use of EMR
Variance after
the use of
EMR
£000 £000 £000 £000 %
31 March 2026
Budget Details
Variance Analysis
RAG Status
Suspense transfer to Reserves 0 (3,212) (3,212) 0 0% 
Service Description
Main Issues / Reason for Variance
Transfer to reserves re SPFO reduction 4,294 (408) (4,702) 0 0% 
Service Description
Main Issues / Reason for Variance
Revenue Support Grant (175,591) (176,208) 0 (617) 0% 
Service Description
Main Issues / Reason for Variance
Non GAE Allocation (8,453) (7,701) 0 752 -9% 
Service Description
Main Issues / Reason for Variance
Central Government Funding (1,672) (2,347) (675) (675) 40% 
Service Description
Main Issues / Reason for Variance
The main reason for this favourable variance is due to additional money received for expenditure
already built into the budget.
This represents the funding from Scottish Government
Release of suspense balances to Earmarked Reserves
A review of the Council’s suspense accounts has identified material sums sitting in suspense
accounts which have accumulated over a number of years which can be released back to earmarked
reserves as agreed in the October finance update.
Balance of in year SPFO saving
Balance of SPFO in year saving to be transferred to earmarked reserves to smooth the budget gap in
future years.
This budget reflects funding received from Central Government
The UK Government provided funding to the council to support local recycling services.  The actual
amount received was greater than originally anticipated. The additional amount (£0.675m) will be
earmarked to deliver future recycling initiatives.
Following a recent review, there is a reduction in the recharge of central support services to non GAE
services.
This budget represents the recharge of central support services to non GAE services ie HRA and
capital
Page 78

Page 79

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2025/26 BY CHIEF OFFICER
DEPARTMENT  Amount b/fwd
into 25/26 from
24/25 
Transfer
to/From
Reserves
25/26 Transfers
In/(Out)/
(Released)
25/26 Estimate  25/26 Actual
Spend 
To be carried
forward into 26/27 
Description 
£  £ £ £  £  £    
1 Revs & Bens: Social Welfare Fund 374,103             374,103                 374,103             -                              To pay the balance of Scottish Welfare Fund grants expenditure funded by the
Scottish Government.  Carried forward to 2025/26.    
2 Revs & Bens: DWP funding 53,000               53,000                   53,000               -                              To support activities related to Housing Benefit and Council Tax Reduction,
including system enhancements scheduled for completion in FY25/26.
3 Financial Service Centre: Automation Team (VKY)  26,284               (26,284) 0 -                          -                     -                              Expenditure linked to the VKY Automation contract approved in 2020/21 as part of
the Robotic Process Automation (RPA) rollout. 
4 Intromissions 200,000                -                     200,000                 53,000               147,000                      Build up of reserve to pay for future liability for historic child abuse cases (as
agreed at Council october 2024)    
5 Regulatory - New document management system 90,000               90,000                   59,570               30,430                        The Planning and Building Standards require a new document management
system to replace the current system. The current timeline is to procure over two
years due to the different stages in the process and the time needed to undertake
them. 
6 Regulatory - Underspend in 'design panel' budget for IDOX
upgrade
7,000                 7,000                     7,000                 -                              This balances relates to the initial stages of designing the new Planning and
Building Standards document management system and will be spent this financial
year.    
7 Developer Contributions 373,309 373,309                 150,854             222,455                      These are financial or in-kind contributions received from developers and are
associated with specific agreements. They need to be retained and used for the
purposes specified in the individual agreements.    
8 Energy Efficiency 325,000 325,000                 -                     325,000                      The funds relate to a Scottish Government Grant received some years ago for
energy efficiency projects. A programme of energy  improvement projects will be
developed with the potential to recycle savings back to the fund.    
9 Business Support 0 -                          -                     -                              Business Loans Scotland Income to be used for future business support activity
over the next 2-3 years.
10 OD & Change Training Budget 8,773                 8,773                     -                     8,773                          Funding allocated to meet defined training needs  
11 Previous provision for equal pay/holiday pay 194,663             194,663                 12,972               181,691                      Balance for outstanding equal pay/holiday pay claims and associated legal
expenses.
RESOURCES
REGULATORY & REGENERATION
PEOPLE & TECHNOLOGY
Page 79

Page 80

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2025/26 BY CHIEF OFFICER
DEPARTMENT  Amount b/fwd
into 25/26 from
24/25 
Transfer
to/From
Reserves
25/26 Transfers
In/(Out)/
(Released)
25/26 Estimate  25/26 Actual
Spend 
To be carried
forward into 26/27 
Description 
£  £ £ £  £  £
12 Education recovery (ELT) 29,834               29,834                   29,834               -                              Balance to be utilised in ASN in new academic year (post August 2025) to cover the
cost of out of authority placements
13 Whole Family Wellbeing Funding 69,862               69,862                   69,862               -                              Balance included in overall WFWB plan for 2025/26 to cover staffing costs and
Edge of Care services from Include
14 Ending Core curriculum charges 129,000             129,000                 129,000             -                              Balance to be utilised for classroom materials (eg technical, home economics) in
secondaries in new academic year (post August 2025)
15 Ukraine 78,000               (78,000) 0 -                          -                     -                             Can be released in 2025/26 as teacher costs already covered by existing budgets
16 Removal of music instruction fees 30,000               30,000                   30,000               -                              Balance to be utilised in new academic year (post August 2025) to expand
opportunities for music education
17 Modern Apprentice 177,494             177,494                 70,913               106,581                     The Balance will be used as part of the four year modern apprenticeship
programme to cover payment across financial years.   The funding will be fully
utilised in year five of the programme.           
18 Employability 442,000 442,000                 -                     442,000                     This fund will be used for the development and delivery of key employability
initiatives to support vulnerable groups allowing for continued support over a
longer period of time.
19 Community Renewal Fund 9,220 9,220                     -                     9,220                         The balance will be used to cover premises costs at the Levengrove Training Centre
and aligns with the Community Renewal Fund priorities; to ensure the continued
delivery of Project Search. A specialist employability programme for young people
with autism and/or learning disabilities. Secure, appropriate, and fully‑equipped
premises are essential for delivering the intensive, on‑site training, employer
engagement, and workplace readiness activities that underpin the Project Search
model.
20 UK Shared Prosperity 18,000                  790,895 808,895                 808,895                     The fund represents the UKSPF Grant allocation 25/26. The carry forward has been
applied under fund flexibility extention rules to enable the completion of UKSPF
outcomes up until the new programme end date of September 2026.
21 UKSPF community grants 2,641                    0 2,641                     2,641                         Community Benefit grants are donations made to W4U for activities/items selected
from WDC wishlist as detailed on WDC webpage.  Funds are for specific items of
expenditure and do not relate to general revenue items of WDC. There is no
restriction that donations have to be spent within the financial year.
22 Extended Producer Responsibility 675,000 675,000                 675,000                     This fund will be used to deliver future recycling initiatives
EDUCATION
ROADS & NEIGHBOURHOOD
Page 80

Page 81

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2025/26 BY CHIEF OFFICER
DEPARTMENT  Amount b/fwd
into 25/26 from
24/25 
Transfer
to/From
Reserves
25/26 Transfers
In/(Out)/
(Released)
25/26 Estimate  25/26 Actual
Spend 
To be carried
forward into 26/27 
Description 
£  £ £ £  £  £
23 Refugee Resettlement 499,255             499,255                 -                     499,255                      EMR to be used to cover resettlement costs in future years if there is a timing
difference between expenditure and Scottish Government grant income.
24 Empty Home 150,000 150,000                 -                     150,000                      EMR to be used to provide interest free or low interest loans to property owners
to renovate or bring their empty properties back into use, for sale of rental. 
25 CCTV Network Upgrade 21,000               21,000                   -                     21,000                        Contribution for the costs of the CCTV project.
26 Set up a an energy Household Energy Support Fund using
£250,000
15,990               0 15,990                   12,565               3,425                          Fund set up to support residents who require crisis support to ensure their
properties remain heated.
27 Cost of Living 1: Enhancement to the Schools Summer
Programmed. £100,000 per year for 4 years.
200,000             200,000                 99,717               100,283                      Balance from £100k to be used to cover holiday activities outwith summer period
(as reported to Education Committee Sept 2025)
28 Cost of Living 2: Create a 4 year School Meal Cost Hardship Fund
to help families struggling with the cost of living. £60,000 per
year.
92,661               (57,786) (13,300) 21,575                   11,407               10,168                        To cover the cost and assist families just above to eligibility threshold for free
school meals who have been unable to pay for a school meal. £50,401 released for
2026/27 budget.
29 Cost of Living 3: Additional Support for Apprenticeships. £50,000
per year for 4 years.
150,000             150,000                 50,000               100,000                      The Apprenticeship Investment Programme being part of a broader programme
which is over a four year period. Payments can cover more than one financial year
and therefore the reserves ensures continuity of the programme.
30 Cost of Living 4: Fund the successful spending on Sport & Leisure
for children during holiday times for the next 4 years. £45,000 per
year.
107,040             107,040                 24,200               82,840                        Additional payments to WDLT for holiday activities (eg gym and swimming classes)
provided over Easter ,summer and autumn
31 Cost of Living 6: Transitional Funding Support to Y-Sort-It over 4
years. £39,000 per year
78,000               78,000                   39,000               39,000                        Transitional funding support for Y-Sort It over a four year period to give them time
to secure external funding.
32 Cost of Living 7: Introduce a programme of creative engagement
and learning focused on supporting people through recovery and
improving wellbeing. £5,000 per year for 4 years.
10,000               10,000                   -                     10,000                        The £5k for each of the four years was partially spent in 23/24 and 24/25 and will
be fully spent in 25/26 once Glencairn and the new museum space in Clydebank
are opened.
33 Provide 64,000 for family fund day events in 2023/24 and the
following three years (approx 32 events at £2,000 per event)
32,000               32,000                   16,000               16,000                        Provision of Family fun days within West Dunbartonshire Council over a four year
period This is year three of the four years and therefore £16k will be carried
forward into 2026/27 to be used.
34 Transfer to Foodbank support fund 151,680             151,680                 31,680               120,000                     26/27 Commitment to support foodbanks as approved by Council March 2026
35 £12k over 4 years to Renton Community Food Hub from April
2024 to March 2028 (formerly Tontine Food Parcels)
9,000                 9,000                     3,000                 6,000                          Subsidy provided to food banks over a three year period to assist with the
provision of food parcels.
36 £12k over 4 years to Lomond Food Pantry from April 2024 to
March 2028
9,000                 9,000                     3,000                 6,000                          Subsidy provided to food banks over a three year period to assist with the
provision of food parcels.
HOUSING & EMPLOYABILITY
COST OF LIVING
Page 81

Page 82

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2025/26 BY CHIEF OFFICER
DEPARTMENT  Amount b/fwd
into 25/26 from
24/25 
Transfer
to/From
Reserves
25/26 Transfers
In/(Out)/
(Released)
25/26 Estimate  25/26 Actual
Spend 
To be carried
forward into 26/27 
Description 
£  £ £ £  £  £
37 £12k over 4 years to Time for Tully from April 2024 to March
2028
9,000                 9,000                     3,000                 6,000                          Subsidy provided to food banks over a three year period to assist with the
provision of food parcels.
39 Flourishing  Faifley 1,150 1,150                     -                     1,150                         Cover the running costs of the group’s ceramics club, enabling it to remain low
cost, promote social inclusion, and help alleviate some of the impacts of the cost of
living crisis.40 Bankie Talk 2,150 2,150                     -                     2,150                         Providing revenue funding to ease financial pressures and allow them to focus on
future proofing the service.
41 Whitecrook Community action Group 3,000 3,000                     -                     3,000                         To support families who require assistance, we will provide food parcel service
Whitecrook Community Action Group with £3000 to support the delivery of 200
family (two adults, two children) food parcels. 
42 Glenhead Community Centre, Duntocher 7,000 7,000                     -                     7,000                         Support towards the costs of  refurbishment  to create a low-cost soft play facility
for families, including a dedicated sensory room. Providing support towards the
cost of the works 43 Uncommitted Cost of Living 0 0 0 0 -                     0 Uncommitted Cost of Living Fund.  As agreed on 4 March 2026 released to balance
the 2026/27 budget.
TOTAL USE OF SERVICE RESERVES          2,652,639 58,571          2,765,424               5,476,634           1,333,677                   4,142,957
Page 82

Page 83

WEST DUNBARTONSHIRE COUNCIL APPENDIX 4
MONITORING OF EARMARKED BALANCES 2025/26 BY CHIEF OFFICER
DEPARTMENT  Amount b/fwd
into 25/26 from
24/25 
Transfer
to/From
Reserves
25/26 Transfers
In/(Out)/
(Released)
25/26 Estimate  25/26 Actual
Spend 
To be carried
forward into 26/27 
Description 
£  £ £ £  £  £
44 Voluntary Redundancy & Early Retirement Reserve 593,000             220,000                972,000 1,785,000              1,131,103         653,897                      Funding for voluntary redundancy and Early retirement linked to 25/26 savings. 
45 Smoothing Fund 1,220,826         (16,000) 0 1,204,826              559,853             644,973                     The smoothing fund is being used to offset service overspends where
savings/efficiencies have not been achieved in year.  See Appendix 6 for details of
where the smoothing fund has been applied (£504k).   A further, £16k will also be
met from the smoothing fund in relation to the shortfall in the generation of site
income from television/film productions within Comms & Marketing and £38k in
the delay in transfer of community facilities within leisure management and £2k
due to the delayed recruitment of the Digital Officer within Strategic  People and
Change.
1 Prudential Target (Future Years) -                     0 -                          -                     -                            
46 Reduction in Strathclyde Pension Fund Employer Contribution 4,355,000         4,701,000 9,056,000              -                     9,056,000                  Build up of the SPFO saving to be used to balance the budget in future years as
agreed in 2023/24.
47 2026/27 Budgeted use of reserves -                     911,758 0 911,758                 -                     911,758                      As agreed at the budget meeting on 4 March 2026  -reserves to be used to balance
the 2026/27 budget
TOTAL USE OF STRATEGIC RESERVES          6,168,826              1,115,758           5,673,000             12,957,584           1,690,956                 11,266,628 
TOTAL USE OF EARMARKED RESERVES           8,821,465              1,174,329           8,438,424             18,434,218           3,024,633                 15,409,585
STRATEGIC RESERVES
Page 83

Page 84

Page 84

Page 85

WEST DUNBARTONSHIRE COUNCIL APPENDIX 5
RECONCILIATION OF GENERAL FUND RESERVES
Unearmarked Balance Earmarked Balance (further detail at Appendix 4)
£(m) £(m) £(m) £(m)
Balance on General Fund as at 31 March 2025
12.514 Earmarked as at 31 March 2025 8.821
Capital Grants and Receipts unapplied 0
Other Reserves (0.242) Transfer into VR/VS earmarked reserve 0.972
Closing General Fund Balance 12.272 Transfer in Intromissions EMR 0.000
Less Earmarked Balances (8.821) Transfer in Community Renewal Fund EMR 0.009
Unearmarked Balance as at 31 March 2025 (draft) 3.451              Transfer in Business Support EMR 0.000
Transfer in Employability EMR 0.442
Transfer from unearmarked to VR/VS EMR (0.220) Transfer in Energy Efficiency EMR 0.325
Release from EMR 0.104 Transfer in Developer contribution EMR 0.373
Transfer to EMR for 2026/27 budget (Agreed 4 March 2026) (1.057) Transfer in Empty Homes EMR 0.150
Transfer in/(out) to EMR (1.173) Allocation to pension smoothing reserve 4.702
Transfer in UK Shared Prosperity 0.791
Transfer in UKSPF Community Grant 0.000
Forecast favourable/(adverse) service outturn 1.797 Transfer in Extended Producer Responsibility 0.675
Forecast favourable/(adverse) non service outturn 4.299
Forecast favourable/(adverse) resources outturn 1.140
Transfer to/(from) general reserves as at Period 10 7.236 Total transfer in EMR 8.439
Forecast unallocated Balance as at 31 March 2026 9.514 Service use of reserves at as at 31 March 2026 (3.027)
Prudential Target (2.5%) - agreed 4 March 2026 5.469 In year movement of EMR as at P12 5.412
Forecast unallocated Balance Above/(Below) Prudential
Target 4.045
Transfer to and from Reserves 1.173
Earmarked Balance as at 31 March 2026 15.406
Page 85

Page 86

Page 86

Page 87

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2025/26
Efficiency Detail Ref Chief Officer
Budgeted
Amount      
£000 
Projection of
Total Saved      
£000 
Projection of
Total Not Saved       
£000 Comment
1 Parking Enforcement RN05 G Macfarlane 325 175 150
The implementation of DPE is progressing and it is
anticipated this will commence in Autumn 2025.  There will
be a part year income and therefore the use of the
smoothing fund is required for the period of the year
before DPE is in place.
2 Office/ Depot Rationalisation SDP05 L Slavin 380 176 204
Relates to two properties (Kilbowie Road and Elm road
where tenants have yet to be identified.   24/25 shortfall to
be funded from the smoothing fund.  In 2025/26 a full
review will be carried out on rental income and a cost
pressure considered for 2026/27.
3
Review the Communities team reducing the delivery of community based
services CCF26 A Graham 87 87 Saving fully achieved in 2025/26
4 Reduction in 2 FTE paralegal support to contracts and property section RR08 A Douglas 90 90 Saving fully achieved in 2025/26
5 Charging for Pre application advice RR09 A Douglas 5                        5                         -                        Saving anticipated to be achieved
6 Remove £12,500 of Nightzone West funding provided to Police Scotland RR01 A Douglas 1                        1                         -                        Saving anticipated to be achieved
7
Review compliance with Strategic Opening Model to identify areas where teams
or posts can be merged CCF26 A Douglas 50                      50                      -                        Saving anticipated to be achieved
8 Revised Legal Charges for Transactions RR06 A Douglas 25                      25                      -                        Saving anticipated to be achieved
9 Registrars RR09 A Douglas 18                      18                      -                        Saving anticipated to be achieved
10 Building Standards A Douglas 10                      10                      -                        Saving anticipated to be achieved
11 Reduce Community Budgeting fund CCF10 A Douglas 27                      27                      -                        Saving anticipated to be achieved
12 Remove Members’ Secretary RR04 A Douglas 22                      22                      -                        Saving anticipated to be achieved
13 Reduce Trading Standards team RR17 A Douglas 14                      14                      -                        Saving anticipated to be achieved
14 Reduce Records Management team RR18 A Douglas 14                      14                      -                        Saving anticipated to be achieved
15 Close Clydebank Registration Office RR19 A Douglas 8                        8                         -                        Saving anticipated to be achieved
16 Combine dog warden & pest control posts RR10 A Douglas 38                      38                      -                        Saving anticipated to be achieved
17 Lead planner replaced by basic grade officer RR11 A Douglas 7                        7                         -                        Saving anticipated to be achieved
18 Antonine wall RR12 A Douglas 27                      27                      -                        Saving anticipated to be achieved
19 Review environmental health RR13 A Douglas 35                      35                      -                        Saving anticipated to be achieved
20 Development planning & placemaking RR20 A Douglas 55                      55                      -                        Saving anticipated to be achieved
21 Review core library staffing (outwith branch libraries)  and remove one post CCF19 A Graham 18                      18                      -                        Saving anticipated to be achieved
22
Review the Communities team reducing the delivery of community based
services CCF26 A Graham 15                      15                      -                        Saving anticipated to be achieved
23 Increase events income CCF05 A Graham 8                        8                         -                        Saving anticipated to be achieved
24 Review film locations and formalise fee arrangements CCF06 A Graham 8                        8                         -                        Saving anticipated to be achieved
2023/24 Efficiencies not achieved
2024/25 Efficiencies not achieved
2025/26 Efficiencies and Management Adjustments
Page 87

Page 88

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2025/26
Efficiency Detail Ref Chief Officer
Budgeted
Amount      
£000 
Projection of
Total Saved      
£000 
Projection of
Total Not Saved       
£000 Comment
25 Reduce Highland Games Spend CCF01 A Graham 15                      15                      -                        Saving anticipated to be achieved
26 Reduce Contact Centre by 2 FTE CCF09 A Graham 30                      30                      -                        Saving anticipated to be achieved
27 Reduce Community Engagement Budget CCF11 A Graham 22                      22                      -                        Saving anticipated to be achieved
28 Reduction in Arts and Heritage - 1.5 FTE reduction. CCF18 A Graham 30                      30                      -                        Saving anticipated to be achieved
29 Review Facilities Mgt Operating Model CCF04 A Graham 300                   150                    150                      
Consultations with workforce on new operating model have
taken longer than anticipated. Shortfall covered by
smoothing fund.
30 Remove telephone survey CCF13 A Graham 9                        9                         -                        Saving anticipated to be achieved
31 Performance and Strategy Budget Efficiencies CCF15 A Graham 9                        9                         -                        Saving anticipated to be achieved
32 Reduce design budget CCF16 A Graham 12                      12                      -                        Saving anticipated to be achieved
33 Electric Vehicle Charging RN13 G Macfarlane 11                      11                      -                        complete
34 School crossing patrollers - adhere to best practice RN01 G Macfarlane 25                      25                      -                        complete
35 Introduce £60 Garden Waste Charge RN02 G Macfarlane 180                   180                    -                        complete
36 Amend roads service activities to support education to statutory level RN04 G Macfarlane 37                      37                      -                        complete
37 Reduce the Consultancy Services/Capital Investment Team by 25% RN18 G Macfarlane 15                      15                      -                        complete
38
Reduce the roads operations service from 29 FTE to 26 FTE which will reduce
resilience in the team RN21 G Macfarlane 60                      60                      -                        complete
39
Reduce maintenance costs through replacing 6 under utilised grass pitches with
3 new 4G pitches
RN22(24-
25 option) G Macfarlane 50                      50                      -                       
Not complete, planning approval process underway and if
approved will issue  tender. 
40 Structural Patching RN23 G Macfarlane 50                      50                      -                        Complete
41
Review compliance with Strategic Opening Model to identify areas where teams
or posts can be merged CCF26 G Macfarlane 50                      50                      -                        Not currently progressed, reviewing options for delivery.
42 Review Allotment charges RN03 G Macfarlane 5                        5                         -                        Complete, charges updated April 25
43 Special Uplift Charge RN26 G Macfarlane 22                      22                      -                        Complete, charges updated April 25
44 Stopping Saturday burials RN01 G Macfarlane 10                      10                      -                        Complete
45 Capitalise Play Park Fitter RN07 G Macfarlane 40                      40                      -                        Complete
46 Further replacement of hire vehicles RN09 G Macfarlane 171                   171                    -                       
Vehicles have been procured and are expected to arrive late
Summer
47 Reduce Working4U service by 50% HE02 G Macfarlane 206                   206                    -                        complete
48 School Crossing Patrollers -Retain 17 Crossing Patrollers RN17 G Macfarlane 23                      23                      -                        Underway, 2 locations still to be resolved
49 Review or remove provision of footway gritting - Cease Footway Gritting RN18 G Macfarlane 68                      68                      -                        complete
50 Close or reduce Dalmuir golf course - Close completely RN20 G Macfarlane 184                   184                    -                        Completed
51 Cease the Care of Gardens scheme RN21 G Macfarlane 143                   143                    -                        Complete
52 Review levels of street cleaning - Reduce by 2 staff
RN22
(2025-26
option) G Macfarlane 26                      26                      -                        Complete
53 Review of park maintenance RN24 G Macfarlane 60                      60                      -                        Complete
Page 88

Page 89

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2025/26
Efficiency Detail Ref Chief Officer
Budgeted
Amount      
£000 
Projection of
Total Saved      
£000 
Projection of
Total Not Saved       
£000 Comment
54 Remove open space maintenance on non council land RN28 G Macfarlane 20                      20                      -                        Complete
55 Review Event Support by Grounds Service RN29 G Macfarlane 15                      15                      -                        Complete. Costs will be recharged to event organisers
56 Road Network & Capital Management Reduction RN30 G Macfarlane 50                      50                      -                       
Part complete, 0.6FTE reduction with further employee
reduction being assessed
57 Review Winter Plan RN31 G Macfarlane 55                      55                      -                        Complete, Plan approved.
58 Reduce Grass Cutting RN35 G Macfarlane 150                   150                    -                        Complete
59 Review Footway Gritting Operational Method RN14 G Macfarlane 60                      60                      -                        Complete
60 Reduce Additional Management Time in Primary Schools EDU08 G Hamilton 152                   152                    -                        Saving anticipated to be achieved
61
Review the Communities team reducing the delivery of community based
services CCF26 G Hamilton 15                      15                      -                        Saving anticipated to be achieved
62
Introduce Early Start Clubs at schools with associated fees (£2) for pupils not
entitled to a free school meal EDU05 G Hamilton 93                      93                      -                        Saving anticipated to be achieved
63
Increase fees for Out of School Care Service at St Eunan’s Primary School and
Linnvale Primary School by £3 from April 2024 EDU09 G Hamilton 7                        7                         -                        Saving anticipated to be achieved
64
Reduce the number of ELC Early Stage Teachers from 16.4 FTE to 11.4 FTE across
the entire ELC learning estate EDU14 G Hamilton 109                   109                    -                        Saving anticipated to be achieved
65
Reduce the number of Early Learning Childcare Posts from 223 FTE to 217 FTE
across the entire ELC learning estate EDU15 G Hamilton 67                      67                      -                        Saving anticipated to be achieved
66
Remove ELC Lead Officer in Bellsmyre and Dalmonach ELC with remaining
management team required to take over aspects of their remit EDU16 G Hamilton 30                      30                      -                        Saving anticipated to be achieved
67
Review the current flexibility in primary school classification  and allocate class
structures based on numerical information which aligns with statutory
obligations EDU20 G Hamilton 200                   200                    -                        Saving anticipated to be achieved
68 Redesign Leadership in Children, Young People and Families Teams EDU25 G Hamilton 6                        6                         -                        Saving anticipated to be achieved
69
Reduce School Clothing Grant for primary school pupils to the statutory level
(£120) EDU02 G Hamilton 64                      64                      -                        Saving anticipated to be achieved
70 Reduce Education Maintenance Allowance to statutory level EDU03 G Hamilton 75                      75                      -                        Saving anticipated to be achieved
71 Shared Head at two early learning centres (Clydebank and Whitecrook) EDU11 G Hamilton 31                      31                      -                        Saving anticipated to be achieved
72 Align funding for 1140 hours for 3 year olds with statutory guidance EDU14 G Hamilton 62                      62                      -                        Saving anticipated to be achieved
73 Reduce School Music Instructors EDU15 G Hamilton 30                      30                      -                        Saving anticipated to be achieved
74 Remove secondary school registration EDU20 G Hamilton 383                   383                    -                        Saving anticipated to be achieved
75 Reduce secondary school clerical staff EDU16 G Hamilton 80                      80                      -                        Saving anticipated to be achieved
76 Reduced Education Support (ELC) EDUC19 G Hamilton 27                      27                      -                        Saving anticipated to be achieved
77 Remove two franking machines and further reduce use of first class mail RES11 L Slavin 8                        8                         -                        Saving anticipated to be achieved
78 Historical Lease Review RES13 L Slavin 44                      44                      -                        Saving anticipated to be achieved
79 Remove one Council officer RES09 L Slavin 8                        8                         -                        Saving anticipated to be achieved
80 Review External Funding - Delete Community Wellbeing Fund RES01 L Slavin 20                      20                      -                        Complete
81 Reduce Corporate Debt team RES06 L Slavin 44                      44                      -                        Complete
82 Reduce number of caretakers RES08 L Slavin 24                      24                      -                        Complete
83 Reduce Housing Benefit  and Council Tax team RES14 L Slavin 16                      16                      -                        Saving anticipated to be achieved
Page 89

Page 90

WEST DUNBARTONSHIRE COUNCIL APPENDIX 6
MONITORING OF EFFICIENCIES AND MANAGEMENT ADJUSTMENTS 2025/26
Efficiency Detail Ref Chief Officer
Budgeted
Amount      
£000 
Projection of
Total Saved      
£000 
Projection of
Total Not Saved       
£000 Comment
84 Review of Capital Programme  RES06 L Slavin 66                      66                      -                        Saving anticipated to be achieved
85 Income Generation through Commercialisation RES09 L Slavin 15                      15                      -                        Saving anticipated to be achieved
86 Further asset rationalisation SDP04 L Slavin 99                      99                      -                        Saving anticipated to be achieved
87 External Consultancy Income SDP09 L Slavin 25                      25                      -                        Saving anticipated to be achieved
88 Review of charges for use of offices by external parties RES09 L Slavin 7                        7                         -                        Saving anticipated to be achieved
89 Historical lease review RES13 L Slavin 15                      15                      -                        Saving anticipated to be achieved
90 Reduce size of Building Services RES15 L Slavin 228                   228                    -                        Saving anticipated to be achieved
91 Review Asset Management team RES19 L Slavin 55                      55                      -                        Saving anticipated to be achieved
92 Reduce budget for temporary accommodation furniture HE03 P Barry 18                      18                      -                        Saving anticipated to be achieved
93 CCTV Service Reduction HE04 P Barry 31                      31                      -                        Saving anticipated to be achieved
94 Restrict choice in office equipment to pre-agreed catalogue items/amounts. PT05 V Rogers 5                        5                         -                        Saving anticipated to be achieved
95
Reduce the Council’s training budget, retaining budget to cover essential
corporate requirements PT07 V Rogers 5                        5                         -                        Saving anticipated to be achieved
96
Reduce manual processing by automating the generation of debtor and creditor
invoices RES11 V Rogers 25                      25                      -                        Saving anticipated to be achieved
97 Remove counselling and physio PT10 V Rogers 9                        9                         -                        Saving anticipated to be achieved
98 Reduce Corporate Administration Support 3 FTE Reduction. PT12 V Rogers 91                      91                      -                        Saving anticipated to be achieved
99 People & Change Team Restructure PT14 V Rogers 62                      62                      -                        Saving anticipated to be achieved
100 Organisational Development Reduction PT15 V Rogers 60                      60                      -                        Saving anticipated to be achieved
101 Outsource  Print Room function PT18 V Rogers 25                      25                      -                        Saving anticipated to be achieved
102 Reduce ICT team: 4 FTE PT20 V Rogers 84                      84                      -                        Saving anticipated to be achieved
TOTAL AGREED SAVINGS OPTIONS & MANAGEMENT ADJUSTMENTS 6,017                5,513                 504                      
Page 90

Page 91

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council: 17 June 2026
_________________________________________________________________ 
Subject: General Services Capital Budgetary Control Report 2025/26 to
31 March 2026 (Draft Outturn). 
1. Purpose 
1.1 This report provides the draft outturn on the General Services capital financial
performance to 31 March 2026. 
2. Recommendations 
2.1 Members are asked to: 
a) Note the draft outturn of the 2025/26 General Services capital budget. 
b) Note the recurring budget underspend and 8 completed projects detailed
in Appendix 2. 
c) Note the reprofiling of the budgets of 50 projects in Appendix 3 of
(£10.264m) over the project life. 
3. Background 
3.1 On 5 March 2025 the Council approved the updated General Services Capital
Plan for 2025/2026 to 2034/35. The three years from 2025/26 to 2027/28
were approved in detail with the remaining years being indicative. The budget
agreed was £73.780m for 2025/26 and £307.818m for the project life budget. 
4. Main Issues 
4.1 Exhibit 1 sets out the revised capital budget at period 10 as reported to
Council on 25 March 2026. 
Exhibit 1: Revised Capital Budget as at 31 January 2026. 
2025/26
(£m)
Project Life
(£m)
Capital Budget Agreed 5 March 2025 73.780 307.818
Updates reported to Council on 27 August, 29
October, 17 December and 25 March plus
adjustments for year-end carried forward balances
8.045 28.708
Reprofiling reported to Council on 27 August, 29
October and 17 December
(22.607) 0
Revised Capital Budget as at Period 10 59.218 336.526 
4.2  Progress against the 2025/26 capital plan is detailed in:
ITEM 14
Page 91

Page 92

Appendix 1 – Project Life Summary by Chief Officer 
Appendix 2 – Completed Projects at Period 12 
Appendix 3 – Reprofiling for Noting 
Appendix 4 – All Approved Projects 
4.3 The overall programme summary report at Appendix 1 shows a reduction
in project life budget of £4.158m. This is due to completed projects being
removed from the capital plan. Note Appendix 1 is constructed assuming
all changes in this report are approved. 
4.4 Appendix 2 highlights 8 projects completed at period 12 and 1 underspend
on a recurring budget. 
4.5  Appendix 3 highlights 50 projects where the expenditure requires to be
reprofiled across the project life but there is no need for additional budget.
This reprofiling will be reflected in the P3 budgetary control report going to
council in August. 
4.6  Exhibit 2 sets out the revised capital budget at period 12 assuming approval
by Council of all recommendations contained within this report. 
Exhibit 2: Revised Capital Budget 
2025/26
(£m)
Project Life
(£m)
Capital Budget as at 31 January 2026 59.218 336.526
Saving (RN 14) – RN 5 Vehicle Replacement
(Para 4.8)
0 0.300
Increased budget – RN 11 Gruggies Burn Flood
Prevention (Para 4.8)
0 3.460
New Funding – RN 39 Milton Park MUGA (Para
4.8)
0.109 0.109
Additional budget – RN 5 Vehicle Replacement
(Para 4.8)
0.255 0.255
Proposed revised Capital Budget as at Period
12
59.582 340.650
Recurring budget underspend (Appendix 2) (0.053) (0.053)
Projects completed at P12 (Appendix 2) (1.382) (5.855)
Overspends in year (Para 4.9) 1.750 1.750
Reprofiling over project life (Appendix 3) (10.264) 0
Proposed revised Capital Budget as at Period
12 subject to Council Approval
49.633 336.492 
4.7 Appendix 4 shows all projects with approved in year and project life budgets
as well as anticipated expenditure. It highlights that the 2025/26 budget is
£59.582m, final spend at 31 March was £50.061m resulting in an in year
variance of (£9.483m). 
4.8  Other minor changes to the capital plan included in the summarised plan in
appendix 4 are:
Page 92

Page 93

• Saving RN 14 approved at council on 4 March 2026 for an additional
£0.300m for replacement of hire vehicles added to the Vehicle
Replacement budget (RN 5). 
• Increased budget of £3.460m for Gruggies Burn Flood Prevention (RN 11)
agreed at council on 25 March 2026. 
• New funding for Milton Park MUGA (RN 39) of £0.109m in 2025/26. 
• Additional budget of £0.255m in Vehicle Replacement (RN 5) for the
purchase of Education mini buses funded by revenue agreed at council on
18 June 2025. 
4.9  The final position resulted in an overspend in RES 9 Direct Project Support of
£1.750m. These are internal project support costs from services for the
execution and implementation of the capital plan throughout the year. Finance
have committed to conducting a review of direct project support costs during
26/27 and this will be reported back to council through the normal capital
budgetary control report process. 
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the projected financial position for capital budgets. 
8. Risk Analysis 
8.1  The main risks are as follows: 
(a) As a consequence of current market conditions, inflation is high and interest
rates continue to be volatile. To forecast for the full capital plan costs budget
assumptions have been required. These assumptions continue to change
regularly and therefore it is likely the projected capital plan budgetary position
will change from that reported. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report.
Page 93

Page 94

11. Consultation 
11.1 All services involved in delivering the capital budgets have been consulted in
the compilation of this report. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council. 
______________
Laurence Slavin
Chief Officer – Resources
Date: 1 June 2026 
Person to Contact:  Lynsey Dickson, Finance Business Partner  
Council Offices, Church Street, Dumbarton   
E-mail: lynsey.dickson@west-dunbarton.gov.uk 
Appendices:  Appendix 1 – Project Life Summary by Chief Officer
Appendix 2 – Completed Projects at Period 12 
Appendix 3 – Reprofiling for Noting
Appendix 4 – All Approved Projects 
Background Papers:    General Services Capital Plan Update - Council 6 March
2024
General Services Capital Plan Update - Council 5 March
2025
Capital Budgetary Control Report (P3) – Council 27
August 2025
Review of Hybrid Meetings of Council and Committees –
Council 27 August 2025
Capital Budgetary Control Report (P5) – Council 29
October 2025
Capital Budgetary Control Report (P7) – Council 17
December 2025
Review of West Dunbartonshire Councils Capital
Programme – Council 17 December 2025
Gruggies Burn Flood Alleviation Scheme – Council 17
December 2025
Financial Update – Council 17 December 2025
General Services Budget Setting – 4 March 2026
Capital Budgetary Control Report (P10) – Council 25
March 2026 
Wards Affected:  All Wards 
Page 94

Page 95

West Dunbartonshire Council Appendix 1
General Services Capital 2025/26
Summary at Period 12
Project Life
Budget
Project Life
Forecast
Spend
Project Life
Variance On Track Off Track
£'000 £'000 £'000
Resources 51,650             53,400            1,750 3                 11
Regulatory and Regeneration 57,125             57,125            0 1                 7
Roads and Neighbourhoods 153,579           147,671          (5,908) 14               20
Education 60,543             60,543            0 -              4
HSCP 8,220               8,220              0 -              3
People and Technology 9,532               9,532              0 -              5
Total 340,650           336,492          (4,158) 18 50
Page 95

Page 96

West Dunbartonshire Council Appendix 2
General Services Capital 2025/26
Projects that are completed at Period 12
Service Project
Approved Budget
2025/26
Approved Project Life
Cost
Actual Project Life
Cost Underspend Comment
£'000 £'000 £'000 £'000
Recurring Budget
Roads and Neighbourhood RN 2 Flood Risk Management 685                                   2,180                      2,127 (53)
This is a recurring budget with an underspend of £53K in 25/26, this is to be recognised in the year as the project
for which is was required was completed under budget.
685 2,180 2,127 (53)
Project Budgets
Roads and Neighbourhood RN 6 Auld Street Clydebank - Bond 42                                      256                         256 0 Project complete on budget
Roads and Neighbourhood RN 7 Clydebank Charrette, A814 52                                   4,303                      4,303 (0) Project complete on budget
Roads and Neighbourhood RN 21 Pappert 2G Pitch 242                                      251                         169 (81) Tender return was under allocated budget
Roads and Neighbourhood RN 26 Strathclyde Partnership for Transport - Bus, cycling and walking
infrastructure improvements & Park and Rides 278                                      278                            -   (278) There was no funding made available in 25/26 for this project from SPT.
Roads and Neighbourhood RN 27 Transport Scotland 24-25 Implementation 20MPH Speed Limits 458                                      458                         112 (346)
This budget was in relation to phase 1 which was significantly less than anticipated.  Further phases require to be
funded through new SG allocations being made available.  Can not be carried forward.
Roads and Neighbourhood RN 28 Review of schools speed Limits 75 75                                                                  27 (48) Project was completed and part funded by external funding
Roads and Neighbourhood RN 31 Bus Infrastructure Fund 50                                        50                           18 (32) Works completed in line with resource capacity
Roads and Neighbourhood RN 35 Road Safety Improvement Fund 185                                      185                           55 (130) Works undertaken to facilitate team to apply for external funding for project delivery in 26/27
1,382                                    5,855                      4,939 (916)
Page 96

Page 97

West Dunbartonshire Council Appendix 3
General Services Capital 2025/26
Reprofiling at Period 12
Service Project
Approved Budget
2025/26
Actual to date
2025/26 Reprofiling
Initial Completion
Date
Revised Completion
Date Comment
£'000 £'000 £'000
Resources RES 1 Valuation Joint Board - Requisition of ICT Equipment 4 4 (0) 31/03/2028 31/03/2028 Remaining budget to be carried forward to 26/27.
Resources RES 2 Agresso Development 6 2 (4) 31/03/2026 31/03/2027 Ongoing support required for Agresso while replacement system in development.
Resources RES 4 Community Success Capital Fund 21 0 (21) 31/03/2026 31/03/2027 No requests for funding have been received under the Community Success Capital Fund during the reporting period.
Resources RES 5 Community Sports Success 9 9 35 31/03/2026 31/03/2027
Community Sports Success received a higher level of demand than anticipated during the 2025/26 financial year, with
funding requests exceeding initial expectations. The Council will continue to work with community groups throughout
2026/27 to support ongoing delivery and manage future funding opportunities.
Resources RES 7 New Sports Changing Facility Dumbarton West (Old OLSP site)  0 9 9 31/03/2026 31/03/2027
The New Sports Changing Facility at Dumbarton West (Old OLSP site) remains part of the Council’s investment in
community sports infrastructure. Delivery is anticipated in 2026/27, with ongoing discussions to coordinate
development alongside adjacent landowners.
Resources RES 8 Building Upgrades and H&S - lifecycle & reactive building upgrades 2,536 3,061 525 31/03/2026 31/03/2027
Has reported an overspend in the period, primarily as a result of an accelerated programme of works across a number
of operational properties. This approach has been taken to address priority compliance and condition issues at an
earlier stage, reducing ongoing risk and future reactive pressures. The programme continues to be managed
responsibly within the overall capital framework, with works prioritised in line with operational need and statutory
requirements.
Resources RES 10 Depot Rationalisation 500 273 (227) 31/03/2027 31/03/2027
Depot Rationalisation is progressing in line with an established programme of works, with completion anticipated in the
2026/27 financial year. The programme will deliver fit-for-purpose facilities that are compliant with current health and
safety standards and support improved operational efficiency.
Resources RES 11 Finance Ledger System 212 222 10 31/03/2027 31/03/2027 Additional cost of staff recharges due to pay award 25-26
Resources RES 12 Community Sports Facility at Millburn 20 16 (4) 31/03/2028 31/03/2028
The Community Sports Facility at Millburn is a community-led project being progressed by the Vale of Leven
Community Sport Hub, with the Council’s contribution provided as match funding to support external funding bids. The
Council will continue to assist the group as required, including supporting feasibility and development work as the
project moves towards delivery.
Resources RES 13 Holm Park Community Football Academy Accesibility Project 75 56 (19) 31/03/2026 31/03/2027
Holm Park Community Football Academy Accessibility Project is not expected to fully draw down the allocated budget
within the current financial year. Final expenditure is subject to receipt of the outstanding invoice from the community
group, which is anticipated in Quarter 2 of 2026/27.
Resources RES 15 Design, Creation, Installation of Digital Content for Glencairn House 187 0 (187) 31/03/2026 31/03/2027
Design, Creation, Installation of Digital Content for Glencairn House is progressing in line with the approved
programme, with completion anticipated in 2026/27. Full utilisation of the allocated budget is currently expected in line
with project delivery.
Regulatory and Regeneration RR 4 Regeneration/Local Economic Development 258 242 (15) 31/03/2026 31/03/2027
This budget includes a number of different budget lines/projects at different stages of development. 25/26 spend was
lower than originally profied due to projects progressing slower than anticipated.
Regulatory and Regeneration RR 5 Regeneration Fund 50 40 (10) 31/03/2028 31/03/2029
This budget includes a number of different budget lines/projects at different stages of development. 25/26 spend was a
contribution to a construction of Dumbarton waterfront walkway which was lower than originally estimated.
Regulatory and Regeneration RR 6 Place Based Investment 150 100 (50) 31/03/2026 31/03/2028 This is externally funded multi-year programme of works. 25/26 spend was lower than originally profied.
Regulatory and Regeneration RR 7 Level Up Funding 4,379 4,860 481 31/03/2026 31/03/2028 This is externally funded multi-year programme of works. 25/26 spend was higher than originally profied.
Regulatory and Regeneration RR 9 District Heating Network Expansion 201 (30) (231) 31/03/2028 31/03/2028
Underspend due to delay in programme of planned district heat network connections. Underspend to be carried
forward to 26/27.
Regulatory and Regeneration RR 10 Clyde Mission Catalyst Fund 625 766 141 31/03/2026 31/03/2028
External funding managed by the Council on behalf of the grantee. The final spend was higher than originally
anticipated, however the overall budget amont remain the same.
Regulatory and Regeneration RR 13 Pride in Place Impact Fund 0 0 0 31/03/2026 31/03/2028
External funding which wac received late in 2025/26 therefore no spend was achieved. To be carried forward, with
spend anticipated in 26/27 & 27/28
Roads and Neighbourhood RN 1 Infrastructure - Roads 2,658 2,571 (87) 31/03/2026 31/03/2027 1 project slipped to 26/27 programme due to conflicting roadworks
Roads and Neighbourhood RN 3 Street lighting and associated electrical infrastructure 100 102 2 31/03/2026 31/03/2027 Not sufficient to undertake a further replacement in 25/26 but will contribute to further replacements in 26/27
Roads and Neighbourhood RN 4 Flood Prevention 193 131 (62) 31/03/2026 31/03/2027 Feasibility and consultation undertaken which delayed design commencing
Roads and Neighbourhood RN 5 Vehicle Replacement 5,358 4,036 (1,322) 31/03/2026 31/03/2027 Underspend due to lead times for delivery of vehicles, budget to be carried forward to 26/27.
Roads and Neighbourhood RN 9 A813 Road Improvement Phase 1 201 8 (193) 31/03/2026 31/03/2027
Phase 1 footway improvements complete however funding required to complete remedial works and design to extend
cycle lane.
Roads and Neighbourhood RN 10 Traffic Signal Updates 14 0 (14) 31/03/2026 31/03/2027 Project wlil be delivered 26/27and this funding will part fund project that has external funding
Roads and Neighbourhood RN 11 Gruggies Burn Flood Prevention 882 0 (882) 31/03/2028 31/03/2028 Further design underway following value enginnering, this budget will be utilised in 26/27
Roads and Neighbourhood RN 12 River Leven Flood Prevention Scheme 200 0 (200) 31/03/2026 31/03/2027 Detailed design will be completed 26/27 and presented for consideration as a capital bid
Roads and Neighbourhood RN 13 Public non-adopted paths and roads 541 262 (278) 31/03/2026 31/03/2027 Design work and costings to be agreed with Roads for projects
Roads and Neighbourhood RN 14 Cemetery Extension, North Dalnotter 250 188 (62) 31/03/2026 31/07/2026 Final drainage and landscaping work still to be completed
Roads and Neighbourhood RN 16 Allotment Development 122 157 34 31/03/2026 30/06/2026 To be funded from Shared Prosperety Fund
Roads and Neighbourhood RN 18 Play Area Upgrade Programme 376 444 67 31/03/2030 31/03/2030 Additional safety surfacing was required.
Roads and Neighbourhood RN 20 Balloch Mountain Bike Track 15 4 (11) 31/03/2026 31/03/2027
Due to planning issues with National Park there is a requirement to re-design the track at another location within
Balloch Park. This has led to delays in developing a tender package
Roads and Neighbourhood
RN 23 Creation of 3 new all weather pitches at Argyll Park, Lachie Stewart
Memorial Park and Mountblow playing fields 50 2 (48) 31/03/2026 31/03/2027 Planning and contractural issues have resulted in delays to commencement of works
Roads and Neighbourhood RN 24 Exxon City Deal 20,585 14,369 (6,216) 31/03/2028 31/03/2028
Project underway, spend not in line with projection due to delays to works on site and defect completion on Network
Rail works
Roads and Neighbourhood RN 25 Active Travel 942 427 (514) 31/03/2028 31/03/2028 Project externally funded and agreement made to deliver in 26/27
Roads and Neighbourhood RN 29 Roads Lining and Signing 150 83 (67) 31/03/2027 31/03/2027 Works ongoing to complete DPE lining as delay caused by weather
Roads and Neighbourhood RN 30 Plant and Machinery Replacement 516 78 (438) 31/03/2026 31/03/2027 Longer lead time for delivery of machines than was expected
Roads and Neighbourhood RN 32 People and Places - Transport Scotland 35 26 (9) 31/03/2026 31/03/2026 Works completed under budget.  Can not be carried forward
Roads and Neighbourhood RN 34 Nature Restoration Fund 185 81 (104) 31/03/2026 31/08/2026 Some seasonally dependant works still to be carried out.
Education EDUC 1 AV Equipment - Education 96 113 17 31/03/2030 31/03/2030 Change in approach to replacement of items in 2025/26 due to staff shortage. Will be addressed in 2026/27
Education EDUC 3 Schools Estate Improvement Plan - next Phase - Faifley Campus 8,994 9,060 66 31/03/2027 31/03/2027 Overspend to be accelerated from FY26/27 - Demolition of Edinbarnet, Auchnacraig and EC still to be carried out
Education EDUC 4 Schools Estate Improvement Plan 1,181 825 (356) 31/03/2026 31/03/2027 Programme of works to be confirmed
Page 97

Page 98

Education EDUC 5 Free School Meals Expansion 51 57 6 31/03/2026 31/03/2028
Free School Meals Expansion relates to works required to support the delivery of statutory obligations, including
necessary kitchen, dining and associated facility upgrades. Budget has been accelerated from 2026/27 to
accommodate preparatory works, ensuring the programme is in place to meet implementation requirements.
HSCP HSCP 1 Special Needs - Aids & Adaptations for HSCP clients 935 917 (18) 31/03/2026 31/03/2027
There is a slight underspend in this project for 2025/26 due to the nature of budget and fluidity of spend. This is a
recurring budget and underspend requires to be carried forward due to likely demographic growth in client demand.
HSCP HSCP 2 ICT Modernisation HSCP 114 42 (72) 31/03/2026 31/03/2027
Discussion around the website upgrade, which was planned for 2025/26, took longer than planned but the service are
hoping to move forward early in the 2026/27 financial year.
HSCP HSCP 3 Community Alarm upgrade 272 292 20 31/03/2026 31/03/2027 Overspend due to additional staff time of community alarm staff involved in the installation of alarms.
People & Technology P&T 1 ICT Modernisation 578 731 153 31/03/2026 31/03/2027
Overspend ocurred due to timing of supplier invoices which resulted in two large device orders being paid from 25/26
budget instead of 26/27 as planned. Devices were ordered early to avoid device prices increase of over 20%.
People & Technology P&T 2 ICT Security & DR 737 678 (59) 31/03/2026 31/03/2027 Underspend due to security hardware projects carrying forward into next budget year.
People & Technology P&T 3 365 Implementation 226 202 (23) 31/03/2026 31/03/2027
Delays throughout the project year has resulted in phased work being carried forward into the 26/27 budget period.
The remaining budget will be used as originally forecast.
People & Technology P&T 4 Development of Workforce Management System 2 2 (0) 31/03/2027 31/03/2027 This is a 5 year rolling programme, project date extended to reflect this.
People & Technology P&T 5 Data Strategy 27 0 (27) 31/03/2026 31/07/2026
Delayed start to discovery work to enable full engagement, project commencing in Q3 25/26 would have resulted in
limited availability for services to participate resulting in a detrimental impact on the end strategy. 
(10,264)
Page 98

Page 99

West Dunbartonshire Council Appendix 4
General Services Capital 2025/26
All Projects Approved at P12
Service Project Completion Date Revised End Date
Project Life
Budget
Spend to
31/03/2025
Actual Spend in
2025/26 Projected
Future Spend
Total Updated
Projected Spend Approved Budget
2025/26
Actual to date
2025/26
In Year
Variance Overspend Underspend Re-profiling
£000 £'000  £'000  £'000  £'000 £'000 £'000 £'000
RES 1 Valuation Joint Board - Requisition of ICT Equipment 31 March 2028 31 March 2028 30 17 4 9 30 4 4 (0) (0)
RES 2 Agresso Development 31 March 2026 31 March 2027 92 86 2 4 92 6 2 (4) (4)
RES 4 Community Success Capital Fund 31 March 2026 31 March 2027 150 0 0 150 150 21 0 (21) (21)
RES 5 Community Sports Success 31 March 2026 31 March 2027 250 10 9 231 250 9 9 35 35
RES 6 Strathleven Place (formerly part of Glencairn House project) 31 March 2026 31 March 2027 1,590 0 0 1,590 1,590 0 0 0
RES 7 New Sports Changing Facility Dumbarton West (Old OLSP site)  31 March 2026 31 March 2027 349 9 9 331 349 0 9 9 9
RES 8 Building Upgrades and H&S - lifecycle & reactive building upgrades 31 March 2026 31 March 2027 24,704 0 3,061 21,643 24,704 2,536 3,061 525 525
RES 9 Direct Project Support 31 March 2026 31 March 2027 14,274 0 3,336 12,688 16,024 1,586 3,336 1,750 1,750
RES 10 Depot Rationalisation 31 March 2027 31 March 2027 8,500 2,335 273 5,892 8,500 500 273 (227) (227)
RES 11 Finance Ledger System 31 March 2027 31 March 2027 800 34 222 544 800 212 222 10 10
RES 12 Community Sports Facility at Millburn 31 March 2028 31 March 2028 500 0 16 484 500 20 16 (4) (4)
RES 13 Holm Park Community Football Academy Accesibility Project 31 March 2026 31 March 2027 75 0 56 19 75 75 56 (19) (19)
RES 14 4G Football pitch at Faifley Knowles 31 March 2026 31 March 2027 150 0 0 150 150 0 0 0
RES 15 Design, Creation, Installation of Digital Content for Glencairn House 31 March 2026 31 March 2027 187 0 0 187 187 187 0 (187) (187)
Total Resources 51,650 2,491 6,987 43,923 53,400 5,156 6,987 1,866 1,750 0 116
RR 4 Regeneration/Local Economic Development 31 March 2026 31 March 2027 6,995 0 242 6,752 6,995 258 242 (15) (15)
RR 5 Regeneration Fund 31 March 2028 31 March 2029 10,931 7,107 40 3,784 10,931 50 40 (10) (10)
RR 6 Place Based Investment 31 March 2026 31 March 2028 2,176 1,401 100 675 2,176 150 100 (50) (50)
RR 7 Level Up Funding 31 March 2026 31 March 2028 22,259 11,851 4,860 5,549 22,259 4,379 4,860 481 481
RR 8 Level Up Capacity Funding 31 March 2026 31 March 2028 160 160 0 0 160 0 0 0
RR 9 District Heating Network Expansion 31 March 2028 31 March 2028 11,104 259 (30) 10,875 11,104 201 (30) (231) (231)
RR 10 Clyde Mission Catalyst Fund 31 March 2026 31 March 2028 2,000 673 766 561 2,000 625 766 141 141
RR 13 Pride in Place Impact Fund 31 March 2026 31 March 2028 1,500 0 0 1,500 1,500 0 0 0 0
Total Regulatory and Regeneration 57,125 21,450 5,978 29,696 57,125 5,663 5,978 316 0 0 316
RN 1 Infrastructure - Roads 31 March 2026 31 March 2027 23,010 0 2,571 20,439 23,010 2,658 2,571 (87) (87)
RN 2 Flood Risk Management 31 March 2026 31 March 2026 2,180 0 632 1,495 2,127 685 632 (53) (53)
RN 3 Street lighting and associated electrical infrastructure 31 March 2026 31 March 2027 900 0 102 798 900 100 102 2 2
RN 4 Flood Prevention 31 March 2026 31 March 2027 450 257 131 62 450 193 131 (62) (62)
RN 5 Vehicle Replacement 31 March 2026 31 March 2027 13,900 0 4,036 9,864 13,900 5,358 4,036 (1,322) (1,322)
RN 6 Auld Street Clydebank - Bond 31 March 2026 31 March 2026 256 214 42 0 0 42 42 0 0
RN 7 Clydebank Charrette, A814 31 March 2026 31 March 2026 4,303 4,251 52 0 0 52 52 (0) (0)
RN 9 A813 Road Improvement Phase 1 31 March 2026 31 March 2027 1,579 1,379 8 193 1,579 201 8 (193) (193)
RN 10 Traffic Signal Updates 31 March 2026 31 March 2027 300 286 0 14 300 14 0 (14) (14)
RN 11 Gruggies Burn Flood Prevention 31 March 2028 31 March 2028 48,160 987 0 47,174 48,160 882 0 (882) (882)
RN 12 River Leven Flood Prevention Scheme 31 March 2026 31 March 2027 381 181 0 200 381 200 0 (200) (200)
RN 13 Public non-adopted paths and roads 31 March 2026 31 March 2027 1,893 0 262 1,630 1,893 541 262 (278) (278)
RN 14 Cemetery Extension, North Dalnotter 31 March 2026 31 July 2026 264 14 188 62 264 250 188 (62) (62)
RN 16 Allotment Development 31 March 2026 30 June 2026 492 312 157 24 492 122 157 34 34
RN 18 Play Area Upgrade Programme 31 March 2030 31 March 2030 1,413 0 444 970 1,413 376 444 67 67
RN 20 Balloch Mountain Bike Track 31 March 2026 31 March 2027 450 7 4 439 450 15 4 (11) (11)
RN 21 Pappert 2G Pitch 31 March 2026 31 March 2026 251 8 161 0 0 242 161 (81) (81)
RN 23
Creation of 3 new all weather pitches at Argyll Park, Lachie Stewart Memorial Park and
Mountblow playing fields 31 March 2026 31 March 2027 1,450 47 2 1,402 1,450 50 2 (48) (48)
RN 24 Exxon City Deal 31 March 2028 31 March 2028 46,942 11,370 14,369 21,204 46,942 20,585 14,369 (6,216) (6,216)
RN 25 Active Travel 31 March 2028 31 March 2028 942 0 427 514 942 942 427 (514) (514)
RN 26
Strathclyde Partnership for Transport - Bus, cycling and walking infrastructure
improvements & Park and Rides 31 March 2028 31 March 2028 278 0 0 0 0 278 0 (278) (278)
RN 27 Transport Scotland 24-25 Implementation 20MPH Speed Limits 31 March 2028 31 March 2028 458 0 112 0 0 458 112 (346) (346)
RN 28 Review of schools speed Limits 31 March 2028 31 March 2028 75 0 27 0 0 75 27 (48) (48)
RN 29 Roads Lining and Signing 31 March 2027 31 March 2027 150 0 83 67 150 150 83 (67) (67)
RN 30 Plant and Machinery Replacement 31 March 2026 31 March 2027 1,316 0 78 1,238 1,316 516 78 (438) (438)
RN 31 Bus Infrastructure Fund 31 March 2026 31 March 2026 50 0 18 0 0 50 18 (32) (32)
RN 32 People and Places - Transport Scotland 31 March 2026 31 March 2026 35 0 26 9 35 35 26 (9) (9)
RN 33 Shared Prosperity Funding - Open Places 31 March 2026 31 August 2026 396 0 0 396 396 0 0 0
RN 34 Nature Restoration Fund 31 March 2026 31 August 2026 185 0 81 104 185 185 81 (104) (104)
RN 35 Road Safety Improvement Fund 31 March 2026 31 March 2026 185 0 55 0 0 185 55 (130) (130)
RN 36 Food Waste Vehicles 31 March 2027 31 March 2027 500 0 0 500 500 0 0 0
RN 37 CCTV Upgrade at Depots 31 March 2027 31 March 2027 50 0 0 50 50 0 0 0
RN 38 Gully Motor Purchase 31 March 2027 31 March 2027 275 0 0 275 275 0 0 0
RN 39 Milton Park MUGA 31 March 2026 31 March 2026 109 0 109 0 109 109 109 0
Total Roads and Neighbourhood 153,579 19,312 24,177 109,121 147,671 35,548 24,177 (11,372) 0 (969) (10,402)
EDUC 1 AV Equipment - Education 31 March 2030 31 March 2030 859 356 113 390 859 96 113 17 17
EDUC 3 Schools Estate Improvement Plan - next Phase - Faifley Campus 31 March 2027 31 March 2027 36,515 24,767 9,060 2,688 36,515 8,994 9,060 66 66
EDUC 4 Schools Estate Improvement Plan 31 March 2026 31 March 2027 21,904 19,921 825 1,158 21,904 1,181 825 (356) (356)
EDUC 5 Free School Meals Expansion 31 March 2026 31 March 2028 1,265 23 57 1,185 1,265 51 57 6 6
Total Education 60,543 45,067 10,055 5,421 60,543 10,322 10,055 (267) 0 0 (267)
HSCP 1 Special Needs - Aids & Adaptations for HSCP clients 31 March 2026 31 March 2027 6,816 0 917 5,899 6,816 935 917 (18) (18)
HSCP 2 ICT Modernisation HSCP 31 March 2026 31 March 2027 969 0 42 927 969 114 42 (72) (72)
HSCP 3 Community Alarm upgrade 31 March 2026 31 March 2027 435 0 292 143 435 272 292 20 20
Total HSCP 8,220 0 1,251 6,969 8,220 1,321 1,251 (70) 0 0 (70)
In YearFull Project Life Year-end Position
Page 99

Page 100

Service Project Completion Date Revised End Date
Project Life
Budget
Spend to
31/03/2025
Actual Spend in
2025/26 Projected
Future Spend
Total Updated
Projected Spend Approved Budget
2025/26
Actual to date
2025/26
In Year
Variance Overspend Underspend Re-profiling
£000 £'000  £'000  £'000  £'000 £'000 £'000 £'000
P&T 1 ICT Modernisation 31 March 2026 31 March 2027 4,579 0 731 3,848 4,579 578 731 153 153
P&T 2 ICT Security & DR 31 March 2026 31 March 2027 3,833 0 678 3,155 3,833 737 678 (59) (59)
P&T 3 365 Implementation 31 March 2026 31 March 2027 983 757 202 23 983 226 202 (23) (23)
P&T 4 Development of Workforce Management System 31 March 2027 31 March 2027 110 0 2 108 110 2 2 (0) (0)
P&T 5 Data Strategy 31 March 2026 31 July 2026 27 0 0 27 27 27 0 (27) (27)
Total P&T 9,532 757 1,614 7,161 9,532 1,570 1,614 44 0 0 44
Overall Total 340,650 89,078 50,061 202,292 336,492 59,582 50,061 (9,483) 1,750 (969) (10,264)
Page 100

Page 101

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 17 June 2026
___________________________________________________________________ 
Subject:  Housing Revenue Account Outturn for Financial Year 2025/2026 
1. Purpose 
1.1 The purpose of this report is to advise members of the Housing Revenue
Account (HRA) outturn position for 2025/2026. 
2.  Recommendations 
2.1 Members are asked to: 
i. note the HRA outturn 2025/26 surplus of £0.512m, a projected favourable
variance (underspend) of £0.477m. 
ii. note the 31 March 2026 HRA reserve position of £1.122m which is £0.038m
below the HRA prudential target of £1.160m. 
3. Background 
3.1 The Council approved the 2025/26 HRA revenue budget on the 5 March 2025
with a prudential reserve target of £1.160m. HRA prudential reserves were
£0.610m on 31 March 2025.  
4. Main Issues 
4.1  The HRA 2025/26 surplus is £0.512m, a reduction of £0.567m on the period
10 forecast surplus of £1.079m. The movement between outturn and BCR10
is summarised in Exhibit 1. The variance between the outturn and the budget
is summarised in Exhibit 2. The key changes over the last period are:   
• Reduction in employee spend due to tight controls on recruitment and
an increase to the employee costs allocated to non HRA services.
• Increase in the HRA central support allocation following a
comprehensive review of the allocation model during 2025/26. 
• Reduction in repair spend due to tighter controls over repair spend.
• Increase in the open space spend due to the Council decision in
December 2025 to charge the HRA additional costs required to improve
HRA open space.
• Increase in the bad debt provision following a review of rechargeable
repair recovery rates.
• Reduction in void loss reflecting lower void house numbers in the last
quarter.
• Increase in HRA loan expenses due to HRA capital debt increasing as
a share of overall council capital debt. 
ITEM 15
Page 101

Page 102

Exhibit 1 – Movement between Outturn and BCR10 
Budget Heading  Out-turn
£m
Forecast
BCR10
£m 
Change
£m 
Key Driver 
Employees  7.630  8.043  (0.413) Increase in staff costs reallocated from
HRA to non HRA services.
Property  1.351  1.273  0.078 Electricity costs exceeded forecast.
Transport  0.208       0.201  0.007 
Supplies & Services  0.477       0.467  0.010 
Central Support   3.074       2.586  0.488 Review of central support allocation
model increased the charge to the HRA
revenue account.
Other Expenditure   0.374       0.371  0.003 
Repairs & Maintenance  12.342  12.477  (0.135) Responsive repairs spend was below
forecast.
Open Space Maintenance   0.843  0.664  0.179 Council decision to increase grass
cutting with an associated £0.140m
charge to the HRA for works carried out
on HRA land.  There was also an
additional charge applied by
Greenspace for full cost recovery on
additional works undertaken.
Bad Debt Provision  1.812  1.519  0.293 Provision increased for rechargeable
repair debt that has a low recovery rate.
Void Loss / Council Tax  1.060  1.125  (0.065) Reduced number of void houses in the
final quarter of the year.
Loan Charges  27.337  27.227 0.110 Loan charge expenses exceeded
forecast.
HRA Expenditure   56.508   55.953  0.555 
HRA Income  (57.020) (57.032) 0.012 
HRA Surplus  (0.512) (1.079) 0.567 
Exhibit 2 – Outturn compared to Budget 25/26 
Budget Heading  Out-turn
£m
Budget
2025/26
£m 
Variance 
£m 
Employees  7.630  7.855 (0.225)
Property  1.351  1.264 0.087
Transport  0.208  0.154 0.054
Supplies & Services  0.477  0.418 0.059
Central Support   3.074  2.584 0.490
Other Expenditure   0.374  0.420 (0.046)
Repairs & Maintenance  12.342  12.173 0.169
Open Space Maintenance   0.843  0.908 (0.065)
Bad Debt Provision  1.812  1.119 0.693
Void Loss / Council Tax  1.060  0.831 0.229
Loan Charges  27.337  29.055 (1.718)
HRA Expenditure  56.508  56.781 (0.273)
HRA Income (57.020) (56.816) (0.204)
HRA Surplus (0.512) (0.035) (0.477) 
4.2  The key variances between outturn and budget are detailed below. 
Page 102

Page 103

Employee Costs - £0.225m Favourable. 
4.3 Previous reports to Council highlighted employee cost pressures due to
increased national insurance costs and higher than budgeted pay awards.
Managers reviewed staff activity at the end of the financial year and identified
increased costs attributable to non HRA revenue services including
homelessness, decriminalised parking, HRA capital, and the Housing
Maintenance Trading Account. These increased costs were transferred out of
the HRA revenue account and delivered an employee cost underspend.   
Property Costs - £0.087m Adverse. 
4.4 Previous reports highlighted a property cost pressure due to the block building
insurance cancellation penalty and increased property insurance premiums.
The HRA also incurred higher than budgeted electricity costs. These
additional costs have been partly offset by underspends on other property cost
budgets including rates, gas, and the office accommodation recharge. 
Central Support Costs - £0.490 Adverse. 
4.5 Finance undertook a review of the Council’s Central Support Allocation (CSA)
model during 2025/26 to assess the appropriate allocation of corporate
support costs to service users including the Housing Revenue Account. The
amount charged to the Housing Revenue Account exceeded the 2025/26
budget for HRA CSA costs thereby creating an overspend / adverse variance. 
Repairs and Maintenance - £0.169m Adverse. 
4.6 Previous reports highlighted a repair cost pressure due to the high demand
across the responsive repair and advised that a range of mitigations were  in
place to address the cost pressure including tighter controls on contractor use,
the capitalisation of Electrical Installation Condition Report (EICR) spend that
complements the environmental sensor programme, and the stringent
application of the rechargeable repairs policy. The overspend reflects the
ongoing cost pressure across this service area. 
Open Space Maintenance - £0.065m Favourable. 
4.7 Previous reports highlighted a favourable variance against the open space
maintenance budget reflecting the close working between housing and
greenspace staff to deliver savings through revised work specifications and
streamlined processes in relation to void and temporary accommodation
properties. 
4.8 However, at IRED Committee of 13 August 2025, Housing Committee on 20
August 2025 and Council meeting in December 2025 it was agreed to
increase  grass cutting with associated one off costs to the HRA of £140k in
2025/26 (£65k towards HRA extra grass cutting and £75k towards the cost of
seasonal staff to reinstate HRA grass cutting to 2024/25 levels).  In addition to
this charge a further charge of £64k was applied at year-end by Greenspace
in line with full cost recovery of service provided.   Therefore, although year-
end had a favourable position, it was lower than anticipated due to the
increased costs to be paid for open maintenance works in 2025/26. 
Page 103

Page 104

Bad Debt Provision - £0.693m Adverse. 
4.09 Previous reports highlighted that performance recovering debt and
outstanding debt levels is kept under constant review and that HRA debt
levels have increased alongside the increase in the amount billed to tenants /
owners. A review of the collection rate for rechargeable repair debt led to an
increase in the amount set aside for future irrecoverable debt. 
Void Loss / Council Tax - £0.229m Adverse. 
4.10 Previous reports highlighted cost pressures across the HRA council tax
budget and void loss budgets. While there has been considerable progress in
reducing void numbers and void rent loss, including further reductions in the
number of void houses in the final quarter of the last financial year,
expenditure exceeded budget. Reducing void loss and council tax payments
remains an operational priority and the Council’s Void Working Group and
Building Services Improvement Plan will support further improvement in this
key area. 
Loan Charges - £1.718m Favourable. 
4.11 Previous reports highlighted that a range of measures would contribute to a
significant underspend on HRA loan charges including reduced HRA
borrowing, early termination of long-term fixed rate loans that delivered a one-
off benefit to the HRA, and the allocation of funds held in a General Fund
suspense account to reduce HRA debt. The outturn was in line with earlier
forecasts. 
4.12 Members will be aware of the significant risk and uncertainty around
forecasting local authority borrowing costs and recent geopolitical events in
the Middle East have contributed to an increase in the interest rates payable
on new temporary and new Public Work Loans Board (PWLB) borrowing.
Consequently, there is a risk that debt interest payments exceed budget in the
short term. 
Income - £0.204m Favourable. 
4.13 Previous reports advised that the favourable variance against the HRA income
budget related to a prudent approach when setting the rental income budget
given the uncertainty over the timing of new build and buy back properties
being available for rent. The outturn was in line with earlier forecast.   
5. People Implications 
5.1 There are no people implications. 
6. Financial and Procurement Implications 
6.1 Other than the financial position noted above, there are no financial
implications of the budgetary control report. There are no procurement
implications arising from this report. 
Page 104

Page 105

7. Risk Analysis 
7.1 None 
8. Equalities Impact Assessment (EIA) 
8.1 The report is for noting and therefore no Equalities Impact Assessment was
completed for this report. 
9. Consultation 
9.1 All services involved in delivering the HRA revenue budget have been
consulted during the compilation of this report. 
10. Strategic Assessment 
10.1 Proper budgetary control and sound financial practice are cornerstones of
good governance and support Council and officers to pursue the five strategic
priorities of the Council’s Strategic Plan. This report forms part of the financial
governance of the Council. This report is for noting and, therefore, does not
directly affect any of the strategic priorities.   
Laurence Slavin
Chief Officer – Resources
Date: 17 June 2026
___________________________________________________________________ 
Person to Contact:  Jim McCarron - Business Unit Finance Partner 
Telephone: 07772 322055   
e-mail james.mccarron@west-dunbarton.gov.uk 
Appendices:  Appendix 1 - Budgetary Position (Revenue)    
Appendix 2 - Variance analysis (Revenue) 
Background Papers: None 
Wards Affected:  All 
Page 105

Page 106

Page 106

Page 107

WEST DUNBARTONSHIRE COUNCIL APPENDIX 1
HRA REVENUE BUDGETARY CONTROL 2025/26
PERIOD END DATE 31 March 2026
Budget
2025/26
Outturn
2025/26 Annual RAG Status
£000 £000 £000 %
Employee Costs 7,855                            7,630                        (225) -3% 
Property Costs 1,264                            1,351                        87                             7% 
Transport Costs 154                               208                           54                             0% 
Supplies, Services And Admin 418                               477                           59                             14% 
Support Services 2,584                            3,074                        490                           19% 
Other Expenditure 420                               374                           (46) -11% 
Repairs & Maintenance 12,173                          12,342                      169                           1% 
Open Space Maintenance 908                               843                           (65) -7% 
Bad Debt Provision 1,119                            1,812                        693                           62% 
Void Loss (Council Tax / Lost Rents) 831                               1,060                        229                           28% 
Loan Charges / CFCR 29,055                          27,337                      (1,718) -6% 
Total Expenditure 56,781                          56,508                      (273) 0% 
House Rental Income (55,961) (56,139) (178) 0% 
Lockup Rental Income (232) (234) (2) 1% 
Other Rental income (137) (141) (4) 3% 
Factoring Income (448) (430) 18                             -4% 
Miscellaneous Income (38) (76) (38) 100% 
Total Income (56,816) (57,020) (204) 0% 
Net Expenditure (35) (512) (477) 
Subjective Summary Variance
2025/26
Page 107

Page 108

Page 108

Page 109

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2026
PERIOD 12
Budget
2025/26
Actual
2025/26
£000 £000 £000 %
Employee Costs 7,855 7,630 (225) -3% 
Main Issues
Outcome
Budget
2025/26
Actual
2025/26
£000 £000 £000 %
Property Costs 1,264 1,351 87 7% 
Main Issues
Anticipated Outcome
Budget
2025/26
Actual
2025/26
£000 £000 £000 %
Transport Costs 154 208 54 35% 
Main Issues
Anticipated Outcome
Underspend
Subjective Analysis
Variance
2025/26 RAG
Status
Subjective Description
HRA property costs out with the  repair and maintenance of council dwellings. This includes rates for shops and offices, utility costs, insurance,
cost of HRA offices.
Variance Narrative
Council agreed at its October 2025 meeting to an early termination of the owners' block
building insurance contract. The early termination requires the HRA to pay a termination fee of
£187,000. Insurance premium costs also came in over budget. Underspends across other
property budgets minimised the overspend.
Overspend
Subjective Description
HRA transport costs, primarily caretaking service.
Variance Analysis
Subjective Analysis
Variance
2025/26 RAG
Status
Subjective Description
Employees charged to the HRA. This excludes employees recharged through the Central Support Allocation model.
Variance Narrative
A higher than budgeted pay award and increased employer national insurance costs created a
cost pressure. This pressure was offset by a recharge of staff cost to services out with the HRA
revenue account including the homelessness service, the housing maintenance service and the
HRA capital account.
Variance Narrative
Increased vehicle hire costs were the cause of the overspend.
Overspend
Variance Analysis
Subjective Analysis
Variance
2025/26 RAG
Status 
Variance Analysis
Page 109

Page 110

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2026
PERIOD 12
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Supplies, Services And Admin 418 477 59 14% 
Main Issues
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Support Services 2,584 3,074 490 19% 
Main Issues
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Repairs & Maintenance 12,173 12,342 169 1% 
Main Issues
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Open Space Maintenance 908 843 (65) -7% 
Main Issues
Anticipated Outcome
Greenspace works across HRA open space. Ad-hoc greenspace works within the curtilage of void properties and within properties let to the
homeless service.
Variance Narrative
Officers  reviewed the frequency and specification of greenspace works and delivered spending
reductions in line with tenant priorities.
Underspend
Subjective Description
Subjective Description
Responsive and planned repair and maintenance services to houses and lockups and income recovered from tenant rechargeable and owner
occupier repairs.
Variance Narrative
A high  volume of repair orders and ongoing inflationary pressures are driving up costs, with the
most significant pressure across responsive repair budgets.
Officers  reviewed the repairs spend and identified savings against the 2025/26 repair and
maintenance revenue budget by transferring qualifying repair spend to the HRA capital
programme, primarily revenue funded works that extends asset lifespan. Furthermore,
Electrical Installation Condition Report (EICR) spend that is complementary to the
environmental sensor installation programme has also been funded from the HRA capital
programme.
Overspend
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Subjective Analysis Forecast Variance
2025/26
RAG
Status 
Variance Analysis
Subjective Description
Administrative and ICT software costs including telephony and the cost of publishing and distributing the Housing News.
Variance Narrative
Increased computer software costs and increased Housing News cost were the cause of the
overspend.
Overspend
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Subjective Description
The HRA share of central support services ( Finance. ICT, HR, Contact Centre, Revenues and Benefits, Corporate Admin Support etc)
Variance Narrative
The Central Support Allocation model was refreshed during 2025/2026. The refresh led to an
increased charge to Housing Revenue Account.
Overspend
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Page 110

Page 111

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2026
PERIOD 12
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Bad Debt Provision 1,119 1,812 693 62% 
Main Issues
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Void Loss (Council Tax / Lost Rents) 831 1,060 229 28% 
Main Issues
Anticipated Outcome Overspend
The Council needs to make prudent provision for the non collection of HRA debt. HRA debt has
been increasing as officers more stringently apply the rechargeable repairs policy for repairs
caused by tenant neglect / abuse. These debts are difficult to collect because tenants often
have multiple other debts with the council and others. A review of the bad debt provision 
identified a need to further increase the amount set aside for irrecoverable debt.
Overspend
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Subjective Description
Lost rental income for void houses and lockups and the cost of council tax on long term void properties.
Variance Narrative
There has been a reduction in the number of void properties. However the reduction was less
than budgeted leading to void loss and council tax payments for longer term void houses
exceeding budget. 
The service continues to work with the council tax team / the assessor service to secure
maximum relief for several of our longer-term void properties.
Variance Narrative
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Subjective Description
Provision for uncollected rent across range of HRA debts, including rent arrears, rechargeable repairs and factoring services.
Page 111

Page 112

WEST DUNBARTONSHIRE COUNCIL APPENDIX 2
HRA REVENUE BUDGETARY CONTROL 2025/26
ANALYSIS FOR VARIANCES OVER £50,000
MONTH END DATE 31 March 2026
PERIOD 12
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
Loan Charges / CFCR 29,055 27,337 (1,718) -6% 
Main Issues
Anticipated Outcome
Budget
2025/26
Forecast
Spend
2025/26
£000 £000 £000 %
House Rental Income (55,961) (56,139) (178) 0% 
Main Issues
Anticipated Outcome
A prudent approach was taken when setting the income budget from 2025/26 given the
uncertainty over the  timing of new build and buy back properties being available for rent.
Rental income was slightly more than budget.
Over-recovery
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Subjective Description
Income from the letting of housing stock to tenants and to the homeless service.
Variance Narrative
Variance Analysis
Variance Analysis
Subjective Analysis Forecast Variance
2025/26
RAG
Status
Subjective Description
Loans Fund repayments and the payment of interest and expenses on outstanding HRA debt.
Variance Narrative
HRA capital  debt at 31 March 2025 was lower than forecast and this has reduced debt
servicing costs across debt repayment and debt interest.
Furthermore, HRA capital spend 2025/26 is less than budget, lowering the HRA borrowing
requirement in 2025/26 and, consequently, lowering interest payments.
Finally, Council agreed in October 25 to transfer £1.992m of Energy Efficiency Scotland Area
Based Scheme (EESABS) funding to the HRA. This funding will be used to reduce HRA capital
debt, further lowering HRA debt interest payments.
Underspend
Page 112

Page 113

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer – Resources
Council – 17 June 2026 
___________________________________________________________________ 
Subject:       Housing Revenue Account
Capital Outturn for Financial Year 2025/2026 
1. Purpose 
1.1 The purpose of this report is to advise members of the Housing Revenue
Account (HRA) capital outturn position for 2025/2026. 
2. Recommendations 
2.1 Council is asked to: 
i) Note the outturn position against the 2025/26 HRA capital plan   
3. Background 
3.1 The Council approved the HRA Capital Plan for 2025/26 to 2029/30 on 5
March 2025. The HRA capital plan approved £70.590m of capital expenditure
and £15.324m of capital income in 2025/26, creating a borrowing requirement
of £55.266m. 
3.2  At its meeting on the 27 August 2025, the Housing and Communities
Committee agreed budget adjustments that revised the 2025/26 capital
expenditure budget to £55.547m and the capital income budget to £6.290m,
an updated one-year borrowing requirement of £49.257m. Committee also
approved a revised project life budget of £264.933m. A summary of the
outturn against the revised capital budgets is set out in Exhibit 1. 
Exhibit 1: HRA Capital Outturn 2025/26 
Actual 
(£m)
2025/26 
Budget
(£m)
Variance 
(£m) 
Project Life
Budget
(£m)
Other Capital   5.919 7.433 (1.514)  26.267
Component Replacement   13.592 20.881 (7.289)  93.567
Void  5.744 5.258 0.486  19.873
Structural & Environmental   1.693 3.762 (2.069)  17.320
Support Costs  2.918 3.100 (0.182)  17.155
More Homes   19.894 15.113 4.781  171.129
Total Expenditure  49.760 55.547 (5.787)  345.311
Total Income   (12.396) (6.290) (6.016)  (80.378)
Net Capital Expenditure   37.364 49.257 (11.893)  264.933 
ITEM 16
Page 113

Page 114

4. Main Issues 
4.1 Progress against the 2025/26 HRA capital plan is detailed in Appendix 1. 
4.2 Commentary on the variances above £50,000 are set out in Exhibit 2 below. 
Exhibit 2: Project Over / Underspends 2025/2026 
Ref Project
Actual 
(£m) 
25/26
Budget
(£m) 
25/26
Variance
(£m)  Commentary
1 Capitalised Minor Works 3.273 3.715 (0.442) Underspend due to reduced
contractor spend.
2 Better Homes Priority
Projects 
0.033 0.275 (0.242) Underspend based on timing
of programme. 
3 Environmental Sensors 1.191 2.000 (0.809) Underspend due to challenges
getting access to properties. 
4 Targeted SHQS
/EESSH compliance
works
3.712 6.628 (2.916) Underspend reflects the
changing mix of the capital
programme with an increased
number of mixed tenure
blocks that require owner
consent before work can start.
This necessary process
delays project start. 
5 External Component
Renewal - Roofs
1.187 2.550 (1.363) Underspend reflects the
changing mix of the capital
programme with an increased
number of mixed tenure
blocks that require owner
consent before work can start.
This necessary process
delays project start.  
6 Doors/Window
Component Renewals
4.215 4.985 (0.770) Underspend is due to
challenges getting access to
property. Install team to
continue programmed
addresses and revisit no
accesses to use materials
already supplied. 
7 External Stores /
Garages / Bin Stores
0.000 0.048 (0.048) Works funded from the
capitalised minor works
budget. 
8 Secure entry component
renewals
0.000 0.100 (0.100) Works funded from the
capitalised minor works
budget. 
9 Statutory / Compliance
Works
0.095 0.594 (0.499) Health and safety works
funded from the capitalised
minor works budget. 
Page 114

Page 115

Ref Project
Actual 
(£m) 
25/26
Budget
(£m) 
25/26
Variance
(£m)  Commentary
10 Heating Improvement
Works 
1.646 2.268 (0.622) Overspend due to reduced
demand for replacement
heating systems 
11 Energy Improvements /
Efficiency Works
0.000 0.058 (0.058) Works funded from the
capitalised minor works
budget. 
12 Kitchen Upgrade 2.022 2.850 (0.828) Underspend as team re-
assess and pre-inspect to
ensure a focus on necessary
renewals led by condition.  
13 Bathroom & Shower
Replacement
0.715 0.800 (0.085) Underspend as team re-
assess and pre-inspect to
ensure a focus on necessary
renewals led by condition. 
14 Void House
Programme
5.744 5.258 0.486 Overspend due to mix of work
requiring contactors in addition
to in-house team. 
15 Defective structures
/component renewals
0.170 0.800 (0.630) Underspend as future blocks
are pre-inspected for condition
and re-prioritisation for
completion if necessary. 
16 Environmental Renewal
- Paths & Environment
1.078 1.000 0.078 Overspend due to mix of work
requiring contactors in addition
to in-house team. 
17 Multi Storey Flat
Strategy
0.158 1.720 (1.562) Underspend based on timing
of programme. 
18 Buy Backs 3.528 4.380 (0.852) Underspend due to lower
purchase price of acquired
properties 
19 Demolition Programme 0.232 0.140 0.092 Overspend based on timing of
programme. 
20 Clydebank East 0.601 0.250 0.351 Overspend due to retentions
being accrued into current
financial year.  
21 Pappert 1.012 0.730 0.282 Overspend due to retentions
being accrued into current
financial year. 
22 Mount Pleasant 0.464 0.382 0.082 Overspend due to retentions
being accrued into current
financial year. 
23 Gilmour Avenue  0.326 0.264 0.062 Overspend due to contractor
liquidation and the need to
procure a replacement
contractor. 
Page 115

Page 116

Ref Project
Actual 
(£m) 
25/26
Budget
(£m) 
25/26
Variance
(£m)  Commentary
24 Willox Park Phase1 3.465 2.980 0.485 Overspend due to retentions
being accrued into current
financial year. 
25 Bank Street 1.657 1.500 0.157 Overspend based on timing of
programme.  
26 Bonhill Gap Sites 5.112 1.600 3.512 Overspend based on timing of
programme. 
27 West Thomson Street  0.462 0.375 0.087 Overspend based on timing of
programme. 
28 Silverton 0.007 0.100 (0.093) Underspend based on timing
of programme. 
29 Queen Mary Avenue 2.429 0.800 1.629 Overspend based on timing of
programme. 
30 Dennystoun Forge  0.000 0.400 (0.400) Underspend based on timing
of programme. 
31 Ottawa Crescent  0.413 0.250 0.163 Overspend based on timing of
programme. 
32 Future New Build &
Related Regeneration
Projects 
0.000 0.550 (0.550) Underspend based on timing
of programme. 
33 Fees, Contingency  0.017 0.150 (0.133) Underspend based on timing
of programme. 
34 Scottish Govt Buyback
Grant Income 
(1.326) (0.550) (0.776) Over-recovery based on the
distribution of Scottish
Government acquisition
funding. 
35 7 – 9 Gilmour Avenue
Grant Income  
0.000 (0.120 (0.120)  Under-recovery due to
ongoing negotiations with
Scottish Government over
additional funding  
36 Willox Park Phase 2 
Grant Income 
(0.127) 0.000 (0.127) Over-recovery based on the 
on timing of programme. 
37 Bank Street
Grant Income 
(1.049) (1.500) 0.451 Under-recovery based on the 
on timing of programme. 
38 Bonhill Gap Sites 
Grant Income 
(3.360) (1.600) (1.760) Over-recovery based on the 
on timing of programme. 
39 West Thomson Street
Grant Income 
(0.518) (0.375) (0.143) Over-recovery based on the 
on timing of programme. 
40 Queen Mary Avenue  (1.649) 0.000 (1.649) Over-recovery based on the 
on timing of programme. 
Page 116

Page 117

Ref Project
Actual 
(£m) 
25/26
Budget
(£m) 
25/26
Variance
(£m)  Commentary
41 Ottawa Crescent
Grant Income 
(0.379) 0.000 (0.379) Over-recovery based on the 
on timing of programme. 
42 Future new build sites &
regeneration projects
Grant Income 
0.000 (0.060) 0.060 Funding released to support
accelerated projects 
43 Owner Recoveries  (1.613) (1.500) (0.113) Over-recovery based on
higher than anticipated
invoicing of owners
participating in capital
projects.   
44 Other Grant Income  (2.196) (0.406) (1.790) Additional funding secured to
support capital investment
including more than £1m for
cladding remediation works
and circa £800,000 to support
the acquisition and
refurbishment of properties
allocated to the resettlement
service. 
5. Option Appraisal 
5.1 No option appraisal was required for this report. 
6. People Implications 
6.1 There are no people implications. 
7. Financial and Procurement Implications 
7.1 The report notes the outturn position for the HRA capital plan. 
8. Risk Analysis 
8.1      This is an outturn report therefore there are no risk implications. 
9. Equalities Impact Assessment (EIA) 
9.1 No equalities impact assessment was required in relation to this report. 
10. Environmental Sustainability 
10.1 No assessment of environmental sustainability was required in relation to this
report. 
Page 117

Page 118

11. Consultation 
11.1 All services involved in delivering the capital estimates have been consulted
during the compilation of this report. 
12. Strategic Assessment 
12.1 Proper budgetary control and sound financial practice are cornerstones
of good governance and support Council and officers to pursue the
strategic priorities of the Council’s current Strategic Plan. This report
forms part of the financial governance of the Council. 
________________
Laurence Slavin
Chief Officer – Resources
Date: 17 June 2026 
Person to Contact: Jim McCarron 
Business Partner, Finance 07772 322055  
E-mail: james.mccarron@west-dunbarton.gov.uk 
Appendices: Appendix 1 -  HRA Capital Detail Final Outturn   
Background Papers: 
Housing Revenue Account (HRA) Capital Investment Programme, Revenue
Budget, and Rent Levels for 2025/26 - Council 5 March 2025. 
Wards Affected           All Wards 
Page 118

Page 119

Appendix 1
Project Category Approved
Budget
2025/26
Actual
Spend
2025/26
In Year
Variance
2025/26
£000 £000 £000
Special Needs Adaptations Rolling 668                        693                        25                          
Capitalised Minor Works Rolling 3,715                     3,273                     (442)
Better Homes Priority Budget Rolling 275                        33                           (242)
Environmental Sensors Programme Rolling 2,000                     1,191                     (809)
Housing CCTV Installation Programme Rolling 750                        716                        (34)
QL Development Rolling 10                           13                           3                            
Gypsy Travellers Site Rolling 15                           -                              (15)
Airport Noise Rolling -                              -                              -                        
Other Capital Expenditure 7,433                     5,919                     (1,514)
Targeted SHQS /EESSH compliance works Rolling 6,628                     3,712                     (2,916)
External Component Renewal - Roofs Rolling 2,550                     1,187                     (1,363)
Doors/Windows Component Renewals Rolling 4,985                     4,215                     (770)
External Stores / Garages / Bin Stores Rolling 48                           -                              (48)
Secure entry component renewals Rolling 100                        -                              (100)
Statutory / Regulatory Compliance Works Rolling 594                        95                           (499)
Heating Improvement Works Rolling 2,268                     1,646                     (622)
Energy Improvements / Energy Efficiency Works Rolling 58                           -                              (58)
Kitchen Upgrade Rolling 2,850                     2,022                     (828)
Bathroom & Shower Replacement Rolling 800                        715                        (85)
Major Component Replacement 20,881                   13,592                   (7,289)
Void House Strategy Programme Rolling 5,258                     5,744                     486                       
Void Capital 5,258                     5,744                     486                       
Defective structures/component renewals Rolling 800                        170                        (630)
Environmental Renewal - Paths & Environment Rolling 1,000                     1,078                     78                          
Asbestos Management Works Rolling 242                        287                        45                          
Multi Storey Flat Strategy Rolling 1,720                     158                        (1,562)
Structural & Environmental 3,762                     1,693                     (2,069)
Salaries / Central Support / Overhead Rolling 3,100                     2,918                     (182)
Support Costs 3,100                     2,918                     (182)
Buy Backs Rolling 4,380                     3,528                     (852)
Demolition Programme Rolling 140                        232                        92                          
Contingency Rolling 102                        -                              (102)
Clydebank East Project 250                        601                        351                       
Pappert Project 730                        1,012                     282                       
Mount Pleasant Project 382                        464                        82                          
7-9 Gilmour Avenue Project 264                        326                        62                          
Willox Park Phase1 Project 2,980                     3,465                     485                       
Willox Park Phase2 Project 100                        108                        8                            
Bank Street Project 1,500                     1,657                     157
Bonhill Gap Sites Project 1,600                     5,112                     3,512                    
West Thomson Street Project 375                        462                        87                          
Silverton Project 100                        7                             (93)
Queen Mary Avenue Project 800                        2,429                     1,629                    
Queens Quay Site C Project -                              -                              -                        
Dennystoun Forge – New Build Project 400                        -                              (400)
28 Bridge Street Project 60                           61                           1                            
Ottawa Crescent Project 250                        413                        163
Future New Build & Related Regeneration Projects Rolling 550                        -                              (550)
Fees, Staffing Costs, contingency Rolling 150                        17                           (133)
Affordable Housing Supply Programme 15,113                   19,894                   4,781                    
Total Expenditure 55,547                   49,760                   (5,787)
Page 119

Page 120

Appendix 1
Project Category Approved
Budget
2025/26
Actual
Income
2025/26
In Year
Variance
2025/26
£000 £000 £000
Scottish Govt Buyback Grant Rolling (550) (1,326) (776)
Clydebank East Project -                              -                              -                             
Pappert Site Project (250) (250) -                             
Mount Pleasant Project -                              -                              -                             
7-9 Gilmour Avenue Project (120) 0 120                       
Willox Park Phase1 Project -                              -                              -                             
Willox Park Phase2 Project -                              (127) (127)
Bank Street Project (1,500) (1,049) 451                       
Bonhill Gap Sites Project (1,600) (3,360) (1,760)
West Thomson Street Project (375) (518) (143)
Silverton Project -                              -                              -                             
Queen Mary Avenue Project -                              (1,649) (1,649)
Queens Quay Site C Project 72 72 -                             
Dennystoun Forge – New Build Project -                              0 -                             
28 Bridge Street Project -                              0 -                             
Ottawa Crescent Project -                              (379) (379)
Future new build sites & related regeneration projects Rolling (60) 0 60                          
Owners Recoveries Rolling (1,500) (1,613) (113)
Other Grant Rolling (406) (2,196) (1,790)
HRA Loan Repayments Rolling (1) (1) -                             
Total Income (6,290) (12,396) (6,106)
Net Capital Expenditure 49,257                   37,364                   (11,893)
Page 120

Page 121

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Roads and Neighbourhood 
West Dunbartonshire Council - 17 June 2026 
Subject:   Crematorium 
1 Purpose 
The purpose of this report is to provide the information requested in the
amendment agreed at IRED Committee on 20 May 2026 in relation to
weekend access to the Hall of Remembrance.   
2 Recommendations 
2.1 It is recommended that Council: 
i) Note the actions taken by the Service to deliver the saving option
agreed in March 2026.   
ii) Note the costs set out within the report in item 4.6. 
3 Background 
3.1 Clydebank Crematorium is available for cremations for both residents and non
residents.  The books of remembrance are located in the Hall of
Remembrance at the crematorium. 
3.2 As part of the 2026/27 budget setting process Council agreed that cremations
and viewings of the Book of Remembrance would be offered Monday to
Friday only with the crematorium closed to the public at weekends 
3.3 The service changes were implemented on 1 May 2026. 
3.4 The cost to provide staffing for Saturday and Sunday operation is
approximately £25,000 overtime, which exceeds the £5,000 budget allocated. 
3.5 Overtime will continue to be utilised to cover essential activities including
crematorium cooldown following cremations taking place later in the day. 
ITEM 17
Page 121

Page 122

4 Main Issues 
4.1 On 20 May 2026 the IRED Committee approved the following: 
“that a short report be submitted to the Council meeting of 17 June 2026,
setting out all the options available for members of the public to access the
Book of Remembrance at the Crematorium, on weekends.” 
4.2 The overtime cost during 2024/25 and 2025/26 was in the region of
£25,000/ year.   This is split between Saturday at a cost of £16,500 and
Sunday at a cost of £8,500.  The overtime costs reflect the workforce in
attendance each day to undertake the activities with cremations undertaken
on a Saturday morning. 
4.3 A review of the number of Saturday cremations booked in the previous 2
financial years determined that there were adequate weekday bookings
available to accommodate these.  The available booking slots and number of
Saturday cremations are set out in the following table:  
Year Annual Saturday
Cremations
Available Weekday
Bookings
2024/25 81 255
2025/26 68 407 
4.4   The books of remembrance are located within the Hall of Remembrance. 
Viewing requires an employee to be in attendance to access the requested
date of entry.  The books are stored within glass cabinets to protect the
books, some of which are particularly fragile.  Visitors may request an
alternative date that requires a particular book to be sourced and shared. 
This means that there is not an opportunity to manage access without
employees being present. 
4.5 Most visitors attend on the anniversary of their loved ones passing however
there are a number that attend at other dates throughout the year. 
4.6 Overtime cost to manage access to the Hall of Remembrance are as follows: 
Employee Resource Cost per week Cost per year
1 day/weekend £115 £6,000
2 day/weekend £230 £12,000 
The overtime cost assumes that 4 hours of access will be available. 
4.7 Access to the crematorium and cemetery grounds have not been affected by
this saving option.  Families and other visitors continue to be able to access
memorial walls, memorial benches and the remembrance garden over 7 days. 
Page 122

Page 123

5 People Implications 
5.1 Any changes to the operational delivery of the crematorium will require
workforce considerations.  Overtime is not contractual and requires
volunteers.   
6 Financial & Procurement Implications 
6.1 Weekend access to the crematorium would incur a staffing cost which is
additional to the budget available for 2026/27. 
7 Risk Analysis 
7.1 The Council has a duty to deliver services that demonstrate best value in line
with Council policy and procedures. 
8 Equalities Impact Assessment 
8.1 An equalities impact assessment is not required as this is consideration of an
existing activity.   
9 Consultation 
9.1 Engagement has been undertaken through the budget setting process and
information has been shared on operating hours on site and through social
media. 
10 Strategic Assessment 
10.1 This report reflects the 2022 – 2027 Strategic Plan and in particular the  
following Strategic Priorities: 
•  Our Council is adaptable and focused on delivering best value for our
residents 
Chief Officer:  Gail Macfarlane 
Service Area:   Roads and Neighbourhood 
Date:   2 June 2026
___________________________________________________________________  
Page 123

Page 124

Person to Contact:  Ian Bain    
Greenspace and Waste Manager    
ian.bain@west-dunbarton.gov.uk 
Appendices:  None   
Background Papers: General Services Budget Setting 2026/27 and 2027/28 –
2030/31 Budget Estimates. 
Wards Affected: All
Page 124

Page 125

WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer – Regulatory and Regeneration 
Meeting of West Dunbartonshire Council:  17 June 2026
___________________________________________________________________ 
Subject: Vacancies on Council Committees 
1. Purpose 
1.1 The purpose of this report is to request that the Council fills the current list of
vacancies on council committees, working groups, joint boards and outside
bodies. 
2. Recommendations 
2.1 It is recommended that the Council nominates elected members to fill the
various vacant positions listed in the appendix to this report. 
3. Background 
3.1 The Chief Executive has recently been notified of a number of resignations by
individual members of the Council from positions on committees and other
bodies.   
3.2 Additionally following the Council’s decision to proceed with the Visitor Levy
for visits to the Council area with effect from July 2027 there are vacancies of
the Visitor Levy Advisory Forum for three elected members and it is
suggested that these are filled by two Administration councillors and one
opposition member.  They will join the Forum comprising community
representatives, tourist industry representatives and officers of the Council
and Park Authority, to provide advice and representation on the possible
spend and administration of the levy.  As the Visitor Levy covers the whole of
the Council area it is preferable that if possible members should be nominated
from localities in the vicinity of each of the Vale of Leven, Dumbarton and
Clydebank. 
4. Main Issues 
4.1  It is important that all vacancies are filled as soon as possible to ensure the
effective running of the Council and associate bodies. 
5. People Implications 
5.1 There are no direct implications for employees of this Council. 
6. Financial and Procurement Implications 
ITEM 18
Page 125

Page 126

6.1 There are no financial or procurement implications arising from this report. 
7. Risk Analysis 
7.1 There is a risk of reputational damage if the Council does not fill these
positions. 
8. Equalities Impact Assessment (EIA)  
8.1 There are no impacts on equalities groups arising from the recommendations
of this report. 
9. Consultation 
9.1 Officers from legal and finance have been consulted on the content of this
report. 
10. Strategic Assessment 
10.1 This report does not have a direct impact on the Council’s Strategic priorities. 
Alan Douglas
Chief Officer – Regulatory and Regeneration 
Date:   4 June 2026 
Person to Contact:  Carol-Ann Burns, Senior Democratic Services Officer,
Municipal Buildings, Station Road, Dumbarton. 
Telephone 01389 737186 or e-mail: carol-
ann.burns@west-dunbarton.gov.uk 
Appendix:  Appendix 1 – List of vacancies on council committees,
etc. as at 2 June 2026.  
Background Papers: EIA screening.  
Wards Affected: All 
Page 126

Page 127

West Dunbartonshire Council
Vacancies as at 2 June 2026 
COMMITTEES  
COMPOSITION Vacancies
Committee 
(membership)
Convener and
Depute Convener Labour SNP Others
Audit Committee (8) Convener –
Gordon Scanlan 
Depute – 
Sophie Traynor
John Millar
Martin Rooney
Michelle McGinty
Ian Dickson
Gordon
Scanlan
Lauren Oxley
Sophie Traynor 
Vacancy 
Cultural Committee
(5)
Convener – Martin
Rooney 
Depute Convener
– John Millar
Martin Rooney
John Millar
Lauren Oxley
Chris Pollock 
Vacancy 
Educational 
Services Committee
(14) 
(plus 3 x religious reps –
(Church of Scotland,
Roman Catholic Church,
and Episcopalian),
2 x teacher reps, 2 x
parent reps, and 2 x
MSYPs) 
Convener –
Michelle McGinty 
Depute Convener
– John Millar
Gurpreet Singh
Johal
David McBride
Michelle McGinty
John Millar
Lawrence O’Neill
Martin Rooney
William Rooney
Hazel Sorrell
Karen Murray
Conaghan
Lauren Oxley
Gordon
Scanlan
Sophie Traynor 
Vacancy 1
Vacancy 2 
Licensing Committee
(8)
Convener –
Lawrence O’Neill 
Depute - Gurpreet
Singh Johal 
Lawrence O’Neill
Gurpreet Singh
Johal 
John Millar
Hazel Sorrell 
Ian Dickson
Chris Pollock
Gordon
Scanlan 
Vacancy 
Local Review Body
(10) 
All members of Planning Committee (see below) 
APPENDIX 1
Page 127

Page 128

COMPOSITION Vacancies
Committee 
(membership)
Convener and
Depute Convener Labour SNP Others
Planning Committee
(10) 
Convener –
Lawrence O’Neill 
Depute Convener
– Gurpreet Singh
Johal
Lawrence O’Neill
Gurpreet Singh
Johal 
Hazel Sorrell 
Karen Murray
Conaghan
Ian Dickson
Lauren Oxley
Chris Pollock
Kevin Crawford 
Vacancy 1
Vacancy 2 
COUNCIL WORKING GROUPS 
Working Group Labour SNP Others Vacancies
Member/Officer Working Group
on Cost of Living Crisis (4)
Michelle McGinty
Hazel Sorrell  
Vacancy 1
Vacancy 2 
JOINT BOARDS / COMMITTEES AND STRATEGIC PARTNERSHIPS 
Partnership Meetings
P/A
Nominations
Required
Nominee 
West Dunbartonshire Health &
Social Care Partnership Board
(Integrated Joint Board)
6 plus 3
Informal
Sessions 
3 plus 3 proxies  Michelle McGinty 
Martin Rooney   
John Millar (Sub) 
Hazel Sorrell (Sub) 
Other voting members:- 
Michelle Wailes 
Libby Cairns 
Lesley McDonald 
Vacancy 
Vacancy (Sub) 
West Dunbartonshire Health &
Social Care Partnership – Audit and
Performance Committee
4 3 plus 3 proxies  Michelle McGinty 
Martin Rooney   
John Millar (Sub) 
Hazel Sorrell (Sub) 
Vacancy    
Vacancy (Sub) 
Page 128

Page 129

Other voting members:- 
Michelle Wailes 
Libby Cairns 
Lesley McDonald
West of Scotland Archaeology
Service Joint Committee 
1 plus 1 sub  
John Millar (sub) 
Vacancy     
OUTSIDE BODIES 
Organisation Meetings
P/A
Nominations Elected Member 
Lomond and Clyde Care and
Repair 
2  Fiona Hennebry 
Lawrence O’Neill 
Vacancy (Sub) 1 
Vacancy (Sub) 2
North Strathclyde Area Support
Team (local authority member)
4 1    Vacancy
Visitor Levy Advisory Forum  2 Administration
and 1 Opposition  
Vacancy 
Vacancy 
Vacancy 
Page 129