WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Resources 
Council:  4 March 2026 
Subject:  General Services Budget Setting 2026/27 and 2027/28 – 2030/31
Budget Estimates 
1. PURPOSE 
1.1 This report summarises the key issues relating to the revenue budget estimates
and setting of Council Tax for 2026/27 and the Council’s capital plan. It also
provides budget estimates for 2027/28 to 2030/31. 
1.2 To seek Members approval of the General Services revenue and capital budgets
for 2026/27 through approval of options to close the 2026/27 revenue budget
gap. 
2. RECOMMENDATIONS 
2.1 Members are asked to: 
a) Approve options set out in Appendix 2 to be used to set the General
Services revenue budget for 2026/27 and assist with future projected
budget gaps. 
b) Note the management adjustments set out in Appendix 3 to be used to set
the General Services revenue budget for 2026/27 and assist with future
projected budget gaps. 
c) Agree the 2026/27 Health and Social Care Partnership Requisition
including consideration of the issues highlighted in section 4.9 of this
report. 
d) Agree the 2026/27 West Dunbartonshire Leisure Trust management fee
including consideration of the issues highlighted in section 4.10 of this
report. 
e) Agree the 2026/27 Council Tax rate. 
f) Note the planned use of earmarked reserves of £1.648m in 2026/27. 
g) Approve the proposed 2026/27 capital plan set out in Appendix 4. 
3. BACKGROUND 
3.1 A report to Council on 17 December 2025 reported an estimated 2026/27 mid-
range budget gap of £9.243m and provided a range of options for Member
consideration to close that gap. As a result of decisions made by Council on 17

Page 2

December 2025, the 2026/27, and future year mid-range budget gaps were
reduced as set out in Exhibit 1. 
Exhibit 1: Mid-Range Budget Gap After 17/12/25 Council Meeting 
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
17 Dec 2025 Council Report  9,243 20,787 35,224 45,324 54,738
Saving Options Agreed 17 Dec
2025
(189) (312) (312) (312) (312)
Management Adjustments
Reported 17 Dec 2025
(1,371) (1,371) (1,371) (1,371) (1,371)
Updated Cumulative Budget
Gap 
7,683 19,104 33,541 43,641 53,055 
3.2 This position has been updated to reflect changes since 17 December 2025. The
revised position is set out in the remainder of this report. 
4. MAIN ISSUES 
4.1 Scottish Government Settlement to Councils 2026/27 
4.1.1 The Scottish Budget was announced by the Cabinet Secretary for Finance and
Local Government on 13 January 2026. The Local Government Finance Circular
1/2026 was published on the same day. This Circular detailed the provisional
revenue and capital funding allocations for 2026/27. The provisional total funding
allocations form the basis for the annual consultation between the Scottish
Government and COSLA ahead of the Local Government Finance (Scotland)
Order 2026 being presented to the Scottish Parliament which at the time of
writing is currently scheduled for the end of February 2026. 
4.1.2 The Circular outlines that the Scottish Government will work in partnership with
local government to implement the budget and the joint priorities in return for the
full funding package worth £15.7 billion which includes: 
• £773.8 million of funding baselined as General Revenue Grant as part of the
Verity House Agreement commitment to review ring-fenced funding
• £253.9 million of additional General Revenue Grant to support local priorities 
• £3 million to support Free School Meals
• £160 million for adult social care workers in commissioned services
• £11 million to improve pay for early learning and childcare workers in
commissioned services
• £11 million to support development of people working in children’s social
work
• £7 million to support provision of Free Personal and Nursing care
• £40 million to improve active travel infrastructure
• £11.4 million resource and £15.5 million capital to improve inter-island
connectivity.

Page 3

4.1.3 As per paragraph 4.1.2 the Scottish Government has announced £253.9m of
additional General Revenue Grant for 2026/27. COSLA’s analysis, however,
identifies £234.9m of additional resource—£19m less than the Scottish
Government figure. The difference relates to how the uplift required for the Real
Living Wage in the care sectors has been calculated. Funding has historically
been calculated by applying the uplift to the National Living Wage rate. For
2026/27, the Scottish Government has changed its approach and applied the
uplift only to the National Living Wage rather than the Real Living Wage. Their
position, when the settlement was announced, was that the voluntary Real Living
Wage increases are an employer duty.  This change resulted in a Scotland wide
underfunding of £19m across social care. Since the settlement was announced
the Scottish Government have made additional funding available to cover this
shortfall. The distribution of this funding is still to be confirmed although the
estimated total for the Council is £0.325m with this split between the Health and
Social Care Partnership (£0.321m) and general fund (for Early Years) (£0.004m). 
Also included in the £253.9m additional general revenue grant money is the
agreed Scottish Government contribution to the 2026/27 pay award (0.5%
equating to £41m) and the 2026/27 Teacher Pay award (£18m). Accordingly, the
additional general revenue grant money amounted to £194.9m. 
2026/27 Scottish Government Funding for West Dunbartonshire Council 
4.1.4 Officers have analysed the Scottish Government settlement to confirm the
Council’s total 2026/27 funding before adjusting for changes in funding which
have associated commitments. This is summarised in Exhibit 2. 
Exhibit 2 – Summary of Movement from Original 2025/26 Settlement to Final 2026/27
Settlement   
£,000
2025/26 Grant Settlement 1/25 (February 2025) 255,563 
School Milk  16 
No one left behind  68 
Prisoner early release  25
Nature Restoration Fund  58 
Employers’ National insurance  2,580 
Resettlement  78 
Holiday activities  20 
Single use vape  4 
Rapid Rehousing Transition Plan (RRTP) top up  26 
Teacher Pay Award 2025/26  491 
Revenue Pay Award 2025/26 1,427
Teacher induction scheme  173 
Scottish Welfare Fund  131 
Teacher Pay 2026/27 1,025 
Electoral Registration Officers  20 
Children's social care Real Living Wage – Health & Social Care
Partnership (HSCP) 
155 
Children's social care Real Living Wage - Education  32

Page 4

SRA kinship  39 
Discretionary Housing Payment 262 
Children's Services Real Living Wage - HSCP 168
Children's Services Real Living Wage - Education 31
Scottish Assessors 12
HSCP Carers Service and Respite Care – Real Living Wage 2,870
Early Learning Childcare 208
Pupil Equity Funding 9
School Clothing 7
Revenue Pay Award 2026/27 724
Uncommitted Funding 1,007
2026/27 Grant Settlement 2/26 (February 2026) 267,229 
4.2 Future Years Scottish Government Funding 
4.2.1 Alongside the announcement of the Scottish budget on 13 January 2026, the
Scottish Government also released its three-year spending review. This
document outlines multi-year spending plans for various Scottish Government
portfolios spanning from 2026/27 to 2028/29.   This is summarised in Exhibit 3. 
Exhibit 3 – Summary of Scottish Government Portfolio Three Year Spending Plans as per
January 2026 Spending Review 
Portfolio 2026/27
£m
2027/28
£m
2028/29
£m
Change
over
three-year
period
£m
% Change
over two-year
period]
Local Government 14,783 14,772 14,773 -10 -0.07%
Finance (excluding
Local Government) 421 363 365 -56 -13.30%
Health and Social
Care 21,952 22,786 23,896 1,944 8.86%
Social Justice 8,024.3 8,485.7 8,875.7 851 10.61%
Education & Skills 3,556.1 3,594.5 3,592.1 36 1.01%
Justice & Home
Affairs 4061 3,890.8 3,680.4 -381 -9.37%
Transport 3,952.4 4,053.2 4,335.1 383 9.68%
Deputy First
Minister, Economy
and Gaelic
1,362.3 1,342.9 1,264.2 -98 -7.20%
Housing 1,205.3 1,272.7 1,370.0 165 13.66%
Rural Affairs, Land
Reform & Islands 1,111.4 1,116.9 1,128.7 17 1.56%
Climate Action and
Energy 435.8 434.8 433.4 -2 -0.55%
Constitution,
External Affairs &
Culture
397.5 445.9 437.8 40 10.14%

Page 5

Crown Office &
Procurator Fiscal
Service
248.6 246.8 245.3 -3 -1.33%
Scottish Parliament
and Audit Scotland 166 163 168 2 1.20%
Total Scotland 61,677 62,968 64,565 2,888 4.68% 
4.2.2 Exhibit 3 illustrates that Local Government funding, in cash terms, is expected to
decrease slightly over the three-year period which will require councils to absorb
the financial pressures brought about by inflationary increases. It is expected
detailed estimates at Local Authority level will be available in the Spring at which
point assumptions about future years funding can be further reviewed. In the
meantime, a flat cash settlement has been assumed in future years.  
4.3 Council Tax 
4.3.1 The Council Tax income budget for 2025/26 was set at £45.426m. This is the
starting position for 2026/27. 
4.3.2 As the setting of Council Tax is subject to a political decision no assumptions
were made in year about any increase in 2026/27 or future years. However, a
modest growth in the Council Tax base is assumed over the next five years as
summarised in Exhibit 4. 
Exhibit 4: Estimated Council Tax Income 2026/27-2030/31 
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
Council Tax Income
(before any increase)
45,426 45,426 45,426 45,426 45,426
Estimated Council Tax
Base Growth
213 428 643 858 1,071
Total Council Tax
Income
45,639 45,854 46,069 46,284 46,497 
4.4 Total Funding 
4.4.1 Exhibit 5 summarises the total estimated funding over the next five years within the
mid-range scenario.   
Exhibit 5: Estimated funding 2026/27-2030/31 
Para 2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
General Funding 4.1.4 267,229 267,229 267,229 267,229 267,229
Council Tax Income  4.3.2 45,639 45,854 46,069 46,284 46,497
Extended Producer
Responsibility
Reported
to Council
Dec 2025
2,397 2,397 2,397 2,397 2,397

Page 6

Released
Strathclyde
Pension Fund Gain
Reported
to Council
Dec 2025
5,332 3,726 0 0 0
One off use of
Smoothing Fund in
2025/26
Agreed by
Council in
Mar 2025
(20) 0 0 0 0
Total Funding  320,577 319,206 315,695 315,910 316,123 
4.5 Base Budget 
4.5.1 The base budget for 2026/27 starts off as the 2025/26 revenue budget of
£313.604m and is then adjusted for the changes set out in the following
paragraphs. The base budgets for the subsequent years follow the same logic so
the base increases each year to reflect the assumptions built into the prior year. 
4.5.2 There are elements of Scottish Government funding that are provided as part of
the settlement with the expectation they are used to deliver the service/policy
intended. The base budget needs to be adjusted to reflect the additional costs of
delivering on these funding commitments and the budget increase is limited to
the funding. These commitments, or changes to previous commitments, are set
out in Exhibit 6. 
There are funds yet to be distributed including Scottish Disability Allowance
(£3.3m), Free Personal Nursing Care (£7m) and Care Leaver Payments
(£3.952m), Real Living Wage (£20m).  The HSCP’s share of these will be added
to the requisition once distributed. 
Exhibit 6: Funding Commitments 
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
HSCP     
Carers Services,
Respite Care and
Health & Social Care
Uplift (including
share of Real Living
Wage)
2,870 2,870 2,870 2,870 2,870
Scottish Disability
Assistance -
undistributed
(70) (70) (70) (70) (70)
Children’s Services 165 165 165 165 165
HSCP Total 2,965 2,965 2,965 2,965 2,965
COUNCIL     
Teachers’ Pay 362 362 362 362 362
Discretionary
Housing
223 223 223 223 223
2026/27 Pay Award 485 485 485 485 485

Page 7

Scottish Assessors
Barclay
Implementation
11 11 11 11 11
Pupil Equity Funding 9 9 9 9 9
COUNCIL Total 1,090 1,090 1,090 1,090 1,090 
4.5.3 There are base budget adjustments required to either reflect decisions taken in
previous budgets which have an impact on the 2026/27 budget or decisions
already reported to Council during 2025/26. These are: 
New Base Budget Adjustments since December Council Meeting 
• The 2024/25 management fee paid to West Dunbartonshire Leisure Trust
was reduced by £0.500m to take account of the temporary reduction in the
Strathclyde Pension employer’s contribution rate from 19.3% to 6.5%. The
rate will increase back to 17.5% in 2026/27 which requires the management
fee to be increased by £0.465m.  The reason the required increase is less
than the £0.500m reduction is primarily because the rate is increasing to
17.5% rather than 19.3%.
• As part of the 2022/23 budget the Council agreed to invest £0.250m per
annum for four years in the modern apprentice scheme. 2025/26 was the
final year of this commitment.
• As part of the 2023/24 budget the Council agreed to invest £0.120m per
annum to provide food subsidy to foodbanks for a three-year period.
2025/26 was the final year of this commitment. 
• Finance have reviewed the future loan charges revenue budget projections
to reflect the decisions taken by Council in December 2025 to reduce the
capital programme and account for reprofiling of the capital programme
reported over the course of 2025/26.  The combined impact of this is to
reduce forecast expenditure in 2025/26 by £0.300m.
• Finance have reviewed a range of sundry and service budget lines to
update expenditure estimates for areas such as utilities, non-domestic rates
relief, travel and subsistence. The combined impact of this is to reduce
forecast expenditure in 2025/26 by £0.527m. 
Base Budget Adjustments Already Reported to Previous Council Meetings 
• June and October 2025 Council - £4.239m adjustment to the service
concession arrangement with adjustments profiled within the base budget in
future years.
• June 2025 Council - £0.250m adjustment to reduce estimated allocation to
the Housing Revenue Account for Central Support Allocation costs.  
• June 2025 Council - £0.580m adjustment for staff costs which were
generating income as they were allocated to HRA capital budgets which is
no longer appropriate.
• June 2025 Council - £0.350m adjustment to remove a double count
allocation of Free School Meals income between services and a central
budget line.

Page 8

• June 2025 Council - £0.480m adjustment reflecting a more cost-effective
way to provide school/college transportation through the procurement of
minibuses and employing drivers. 
4.5.4 The revised 2026/27 base budget is shown in Exhibit 7. 
Exhibit 7: Revised Base Budget 
Para 2026/27
£000
Base Budget  4.5.1 313,604
HSCP Funding Commitments 4.5.2 2,965
Council Funding Commitments 4.5.2 1,090
Adjust for Leisure Trust Pension Costs 4.5.3 465
Profiling of March 2022 Council Growth Items 4.5.3 (250)
Profiling of March 2023 Council Growth Items 4.5.3 (120)
Review of loan charges 4.5.3 (300)
Review of Sundry and Service Budgets  4.5.3 (621)
Service Concession Adjustment   4.5.3 (4,329)
Adjustment to HRA Central Support Allocation
costs
4.5.3 250
Adjustment to capital Central Support Allocation 4.5.3 580
Free School Meals 4.5.3 350
Alternative delivery of school transportation  4.5.3 (480)
Revised Base Budget   313,204 
4.5.5 The base budget for future years, before any 2026/27 budget decisions, is shown
in Exhibit 15 after taking into account unavoidable cost pressures, employee cost
changes and non-pay inflation.  
4.6 Employee Costs   
4.6.1 In terms of 2026/27 employee budgets, the expectation would be that the budget
would reflect the 2025/26 budget plus any increase due to pay awards,
incremental progression, and a small built-in assumption of savings being
generated through turnover.     
4.6.2 The 2026/27 pay award has been agreed as 3.5% and this has been built into
estimates as has an increase in the Council’s national insurance contribution. 
4.6.3 Exhibit 8 summarises the estimated changes to the employee budgets in each of
the next five years for Council services including an assumption of £0.680m for
incremental increases in 2026/27 rising to £0.711m per annum in future years.   
Exhibit 8: Estimated Employee Costs 2026/27-2030/31 
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000      
Pay award 5,445 5,608 5,776 5,949 6,127
National Insurance
Increase
117 121 124 128 132

Page 9

Increments  680 711 711 711 711
Total Employee
Increases
6,242 6,440 6,611 6,788 6,970 
4.7 Non-Pay Inflation 
4.7.1 Inflation has been included in the 2026/27 budget estimates and future year
estimates where it is considered necessary to ensure budgets are adjusted to
reflect expected increases in costs.  An additional £0.500m annual general
inflation has been built into the mid-range scenario (£0.250m in best case and
£0.750m in worst case).   
4.7.2 The additional budget requirement, in each year, for non-pay inflation estimated
over the next five years is summarised in Exhibit 9. 
Exhibit 9: Non-Pay Inflation - 2026/27-2030/31 
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
General Provision 500 500 500 500 500
Utilities – Gas 143 149 155 155 155
Utilities – Electricity  143 151 158 158 158
Utilities – Street Lighting 32 33 34 34 34
Water rates 42 44 47 50 50
Non-Domestic Rates 22 22 22 22 22
ICT 32 32 32 32 32
Landfill Tax 12 12 12 12 12
Audit Fee 20 20 20 20 20
PPP Unitary Payment 281 287 293 299 305
Residential Care Costs  94 98 102 100 100
Total 1,321 1,348 1,375 1,382 1,388 
4.8 Cost Pressures 
4.8.1 Services operate on the basis of having to contain any cost pressures within
current resources wherever possible, however that is not always achievable and
it is necessary to ensure budgets are adjusted where necessary for unavoidable
cost increases. 
4.8.2 Cost pressures have been reported to Council over the course of 2025/26 as
they have materialised. However, there are three new cost pressures since the
Finance Update reported to Council on 17 December 2025, which exceed
£0.100m. 
4.8.3 Cost Pressure 1 – Dunbartonshire and Argyll and Bute Valuation Joint
Board (VJB) Contribution (£0.216m) 
Over the ten-year period 2016/17 – 2025/26 the total contribution made to the
VJB by the three constituent authorities (West Dunbartonshire Council, East
Dunbartonshire Council and Argyll and Bute Council) has been on a flat cash
basis with the only exception being a small increase in 2025/26.  This means the

Page 10

VJB has been absorbing all inflationary increases and pay awards from a
combination of delivering savings and using reserves. Exhibit 10 demonstrates
how the VJB reserves have been depleted from a balance of £0.902m in 2021/22
to £0.015m in 2025/26. This is £0.085m under their prudential target of £0.100m 
Exhibit 10 - Dunbartonshire and Argyll and Bute Valuation Joint Board Reserves 
The VJB’s financial position has been subject to ongoing discussions during 2025
between the Assessor and the S95 Officers of the three constituent authorities
and there is an acceptance that the contribution from each authority needs to be
uplifted to ensure the VJB remains financially viable.  The Council’s share of the
uplifted 2026/27 requisition is £1.108m which compares to the current budget of
£0.880m. This is an increase of £0.228m which is partially funded by an increase
in Scottish Government funding of £0.012m leaving a cost pressure to the
Council of £0.216m for 2026/27. For the purposes of future budget planning an
assumption has been made of a 2% per annum increase in the Council’s
contribution.   
4.8.4 Cost Pressure 2 – Sales, Fees and Charges (£0.154m) 
Finance have conducted a review of Council wide sales, fees and charges
income which has highlighted a need to right size the income budget by reducing
anticipated income by £0.154m. This is due to decreased levels of uptake over
multiple years rather than due to any specific decrease in 2025/26. 
4.8.5 Cost Pressure 3 - Gruggies Burn (£0.419m from 2028/29) 
In December 2025 Council agreed to progress the delivery of the full Gruggies
Burn Flood Prevention scheme. This has no effect on the 2026/27 budget but,
based on current project timings, the loans fund impact will create a cost
pressure of £0.419m from 2028/29 onwards.   
4.8.6 In addition to the cost pressures exceeding £0.100m the following less material
cost pressures have been added to the budget: 
• Education – a review identified five budget lines needing increased
totalling £0.252m with this partially offset by £0.159m of budget lines
which could be reduced. This creating a net cost pressure of £0.093m.

Page 11

• Resources – total of £0.071m required to move estate surveyor salaries
from the capital budget to the revenue budget, provide sufficient budget for
security costs in relation to the Ardlui outdoor centre, and for the license
for Call Secure which is required to ensure payment card industry
compliance for cash receipting. 
• Citizens, Culture and Facilities – a review identified four budget lines
needing increased totalling £0.097m with this partially offset by £0.068m of
budget lines which could be reduced. This creating a net cost pressure of
£0.029m.
• Regulatory and Regeneration - £0.026m for the implementation of the
IDOX document management system for Planning and Building
Standards. 
4.8.7 The full list of estimated cost pressures for Council services is noted in Exhibit
11. 
Exhibit 11: Cost Pressures - 2026/27-2030/31   
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
SEEMIS Fees 2 2 2 2 2
Apprenticeship Levy 4 4 4 4 4
Loan Charges  3,070 180 500 500 500
2027/28 Local Government
Elections 
0 200 (200) 0 0
Housing Benefit Admin
Subsidy
10 10 10 10 10
Software Licences  68 68 68 68 68
Intromission Provision  200 200 200 200 0
NDR Revaluation 900 190 0 0 0
Unfunded Pension Costs 200 100 100 100 100
Riverside Additional Support
Needs 
279 77 0 0 0
Reliance on Capital Receipts  500   500   500   500   500 
General Provision  0  1,000   1,000   1,000   1,000 
Early Years Rate  45  0 0 0 0
Additional Support Needs Job
Evaluation 
305  0 0 0 0
Asset Valuation   50  0 0 0 0
Commercial Rental Income  500  0 0 0 0
Crematorium Income  165  0 0 0 0
Transport Costs  117  0 0 0 0
Commercial Waste Income  40  0 0 0 0
Local Delivery Plan  30  (30)  0 0 0
Diesel   60  0 0 0 0
Financial Ledger  85   22   3   3   4 
Grass Cutting  250  0 0 0 0
ICT   56  0  50  0 0
Salt and Grit   60  0 0 0 0

Page 12

General Materials Inflation  30  0 0 0 0
Additional Support Needs
Swimming 
10  0 0 0 0
Recycling Contract   240  0 0 0 0
Co-mingled Recycling
Contract 
30  0 0 0 0
Civic Waste Site Costs  60  0 0 0 0
Fuel Costs  45  0 0 0 0
Recycling Costs  30  0 0 0 0
Food Waste Vehicles  250  0 0 0 0
Provision for temporary
system support 
15  (8)  (7) (1) 0
COSLA membership increase  9   4   4   4   4 
Chief Exec pay award plus
oncosts 
20  0 0 0 0
Cybersecurity  168  0 0 0 0
Gruggies Burn 0 0  419  0 0
Website Costs  9  0 0 0 0
Shortfall in ASN income   66  0 0 0 0
Security/call-outs at Schools  21  0 0 0 0
Bus Contracts  126  0 0 0 0
School Lets Income  19  0 0 0 0
Metered Water Charges  24  0 0 0 0
Sales Fees and Charges  154  0 0 0 0
Building Cleaning - income  60  0 0 0 0
Catering   24  0 0 0 0
Call Secure   21  0 0 0 0
Estate Surveyors   40   40   40   40   0   
Ardlui Security   10  0 0 0 0
VJB Requisition  216  4 4 4 4
Document Management
System 
26  0 0 0 0
Totals 8,719 2,563 2,697 2,434 2,196 
4.9 West Dunbartonshire Health and Social Care Partnership (HSCP) 
4.9.1 On 5 March 2025 the Council agreed a 2025/26 HSCP requisition of £93.442m. 
Exhibit 12 sets out the adjustments made to the 2025/26 HSCP requisition during
2025/26 and the indicative 2026/27 requisition after taking account of the impact
of the 2026/27 settlement.   
Exhibit 12: In year adjustments to HSCP 2025/26 requisition and indicative
2026/27 requisition 
£,000
Original 2025/26 Requisition 93,442
Adjustments in year 
Budget Adjustments (8)
Kinship 39

Page 13

Pay – Children’s Services 155
Revised 2024/25 HSCP Requisition 93,628
Pay – Children’s Services 168
Carers Services, Respite Care and Health & Social
Care Uplift (including share of real living wage)
2,870
Scottish Disability Assistance - Undistributed (70)
2026/27 HSCP Requisition  96,596 
4.9.2 There is an ongoing assumption that the Council’s allocation to the HSCP will be
on the basis of ‘flat cash’ plus the appropriate share of the Health & Social Care
funding commitments detailed in the Local Government Finance Circular
(adjusting for any one-off funding not recurring). However, the Council is able to
provide the HSCP with a cash increase. 
There are three issues for Council to consider in relation to the 2026/27
requisition. 
1. 2025/26 Pay Award
2. 2026/27 Pay Award
3. Any share of the £1.007m of the Council’s uncommitted settlement funding 
Each of these are detailed below. There has been no assumption made in this
report about any political decision in relation to these three areas. Consequently,
the budget gap presented in this report assumes no increase to the flat cash
assumption. 
4.9.3 2025/26 Pay Award 
£1.427m has been made available by the Scottish Government to the Council to
partially fund the 2025/26 pay award. This allocation is based on the total local
government workforce including Council employed social care staff delivering
delegated services through the HSCP. However, councils have autonomy to
allocate funding based on local needs and priorities. Therefore, Council, when
agreeing the 2026/27 budget, needs to decide whether a share of the funding for
the 2025/26 pay award is passed through to the HSCP.  The HSCP makes up
33% of the overall Council staff costs (excluding Teachers) so if the full share
was to be passed on this would amount to £0.475m and the budget gap for
2026/27 will increase by the amount passed on. 
4.9.4 2026/27 Pay Award 
As stated in para 4.1.3 the Scottish Government has included 2026/27 pay award
money within the £253/234.9m uncommitted figure. While the exact amount is
not specified it has been assumed £0.724m is to partially fund the 2026/27 pay
award. Therefore, Council, also needs to decide whether a share of the funding
for the 2026/27 pay award is passed through to the HSCP.  If the full share was
to be passed on this would amount to £0.238m and the budget gap for 2026/27
will increase by the amount passed on. 
4.9.5 Share of £1.007m Uncommitted Funding

Page 14

The process used by the Scottish Government to determine the allocation of
revenue funding is based on a series of Gross Aggregate Expenditure (GAE)
indicators such as number of school children, length of roads etc. Each indicator
determines an allocation of cash to the Council however that does not place any
restriction on what the Council can spend that allocation on.  It is the totality of
these indicators that determines the Council’s settlement. Some of those
indicators relate to social care. 
4.9.6 In 2026/27 there was a material change to the distribution of funding relating to
Adult Social Care GAE indicators as the data previously underpinning the
distribution methodology was approximately 20 years old.  This created material
changes to the allocations to councils.  For West Dunbartonshire, the impact of
these indicators in isolation increased the distribution by £3.022m, offset by other
downward movements within Social Work resulting in an overall increase of
£2.547m.  However, the increase of Social Work indicators by £2.547m and other
Council service GAE indicators by £1.146m cannot be considered in isolation as
these are not reflected in the committed funding in the settlement and do not take
account of the wider complexity of the settlement. Using the indicators alone may
result in some councils being allocated a disproportionally higher or lower share
of the available funding due to their circumstances.  To avoid this and ensure a
fair and stable distribution of funding available, the distribution formula is adjusted
to reflect the ‘Main Funding Floor.’   
4.9.7 The Main Funding Floor sets a minimum grant floor to ensure all councils receive
at least a minimum guaranteed increase in revenue support for each year when
there is an overall increase in revenue funding or a maximum guaranteed
decrease in those years where overall revenue funding decreases.  In essence it
ensures no council experiences excessively large variances in revenue support
from one year to the next. Historically the Council has benefited from the floor, for
example in 2025/26 the Council, gained £3.358m, however in 2026/27 the
Council has contributed £2.548m to the floor, a movement of £5.906m which is
taken from the Council’s funding to provide the final revenue support grant.  The
2026/27 position is not entirely due to the material change in the adult social care
distribution as it is a consequence of all settlement distributions. 
4.9.8 As per paragraph 4.1.4 the overall increase in the Council’s uncommitted funding 
is £1.007m. This is the net consequence of all whole settlement including the
changes in the GAE indicators, the contribution to the floor, funding made
available for the 2026/27 pay award and other directed funding.

Page 15

4.9.9 The Council can choose to pass through a share of the uncommitted funding of
£1.007m to the HSCP as part of the 2026/27 requisition.  An indicative split
based on the forecast 2025/26 expenditure as at period 7 in 2025/26 is set out
below. 
2025/26 Forecast
Expenditure (£m) % Split
Split of
Uncommitted (£m) 
General Fund  230.346 71.14% 0.716 
HSCP Requisition  93.442 28.86% 0.291 
Total  323.788 100.00% 1.007 
4.9.10 Exhibit 13 sets out the options for Council to consider in relation to the HSCP
requisition. 
Exhibit 13 – HSCP Requisition Options 
Option 1
Flat Cash 
£,000
Option 2
Fund
25/26 Pay
Award
£,000
Option 3
Fund 25/26
and 26/27
Pay Award 
£,000
Option 4
Fund 25/26 and
26/27 Pay Award
and Funding Share 
£,000 
Indicative
2026/27 HSCP
Requisition
96,596 96,596 96,596 96,596
2025/26 Pay
Award
0 475 475 475
2026/27 Pay
Award
0 0 238 238
Uncommitted
Funding Share
0 0 0 291
Revised HSCP
Requisition
96,596 97,071 97,309 97,600
Increase to
Council Budget
Gap
0 475 713 1,004 
4.9.11 While Exhibit 13 sets out four possible options the Council can agree any
requisition to the HSCP at either flat cash or higher. Council is asked to consider
the totality of the HSCP requisition. 
4.10 West Dunbartonshire Leisure Trust Management Fee 
4.10.1 On 5 March 2025, the Council agreed a 2025/26 West Dunbartonshire Leisure
Trust (WDLT) management fee of £4,597,492. 
4.10.2 As per paragraph 4.5.3 the 2026/27 management fee needs to be increased by
£464,750 to reflect the Strathclyde Pension employer’s contribution rate
increasing to 17.5% in 2026/27.   
4.10.3 The Service Level Agreement with the Trust does not require the Council to meet
employee uplifts. The 2026/27 pay award will add £0.234m to their expenditure

Page 16

budget.  When agreeing the 2026/27 budget Council needs to decide if funding
will be provided for the 2026/27 pay award.  Exhibit 14 sets out the options for
Council to consider. Note that any decision on the Leisure Trust management fee
also needs to consider saving option CCF10 which is included in Appendix 2. 
Exhibit 14 – West Dunbartonshire Leisure Trust Management Fee 
Option 1
Flat Cash
Option 2
Fund 2026/27 
Pay Award
Base Mgt Fee  4,645,492 4,645,492
Adjust for Increase in Pension Rate 464,750 464,750
Updated Base Mgt Fee 5,110,242 5,110,242
2026/27 Pay Award 0 233,934
Revised Mgt Fee 5,110,242 5,344,176
Increase to Council Budget Gap 0 233,934 
4.11  Budget Gap Prior to Measures to Balance Budget 
4.11.1 The estimated budget gap prior to factoring in any potential options towards
balancing the budget is summarised in Exhibit 15.   
Exhibit 15: Estimated Budget Gap Prior to Measures to Balance Budget  
Para   2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
4.5.4 Revised Base
Budget
313,204 325,867 336,514 346,702 356,136
4.6.4 Employee Cost
Changes
6,242 6,440 6,611 6,788 6,970
4.7.2 Non-Pay Inflation 1,321 1,348 1,375 1,382 1,389
4.8.7 Cost Pressures 8,719 2,563 2,697 2,434 2,195 
Total Expenditure 329,486 336,218 347,197 357,306 366,690
4.4.1 Total Funding 320,577 319,186 315,675 315,889 316,318 
Budget Gap
Cumulative
8,909 17,032 31,522 41,417 50,372 
4.12.2 Exhibit 15 shows a 2026/27 budget gap prior to measures to balance the budget
of £8.909m (assuming HSCP and WDLT requisitions as flat cash). 
4.13 Measures to Balance the Budget – Previously Agreed 
4.13.1 There are a number of measures to balance the budget which have already been
agreed by Council. These are summarised in Exhibit 16. 
Exhibit 16: Previously Agreed Measures to Balance Budget 
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
Management Adjustments
(Mar 2024)
50 0 0 0 0
Savings Options (Dec 2024) 5 5 0 0 0

Page 17

Management Adjustments
(Dec 2024)
127 0 0 0 0
Savings Options (Mar 2025) 1,362 33 0 0 0
Management Adjustments
(Mar 2025)
147 0 0 0 0
Savings Options (Dec 2025) 189 123 0 0 0
Management Adjustments
(Dec 2025)
1,371 0 0 0 0
Assumed 5% increase in
sales, fees and charges 
448.5 471 495 520 546
Total Previously Agreed
Savings
3,699 632 495 520 546 
4.13.2 Exhibit 17 sets out the estimated budget gap after previously agreed measures. 
This shows that there is a further £5.210m of measures required to balance the
2026/27 budget. 
Exhibit 17: Budget Gap After Application of Previously Agreed Measures 
2026/27
£000
2027/28
£000
2028/29
£000
2029/30
£000
2030/31
£000
Cumulative Budget Gap Before
Previously Agreed Measures
8,909 17,032 31,522 41,417 50,372
Previously Agreed Measures (3,699) (632) (495) (520) (546)
Cumulative Budget Gap After
Previously Agreed Measures
5,210 16,401 31,027 40,897 49,826 
4.13.3 Note that this residual gap of £5.210m assumes the: 
• HSCP requisition is not increased above flat cash (section 4.9 provides
options ranging from flat cash to a £1.004m increase in 2026/27)
• WDLT management fee is not increased above flat cash (section 4.10
provides options from flat cash plus increase in pension costs to a
£0.234m increase in 2026/27) 
Depending on the decisions taken with regard to these two issues the budget gap
could increase to as high as £6.448m. 
4.14 Measures to Balance the Budget – For Council Approval 
4.14.1 There are a range of options to assist Members to balance the 2026/27 budget.
These options are set out in the following paragraphs.

Page 18

Council Tax 
4.14.2 The setting of Council Tax should happen on the same day as the Council sets
its revenue budget as once all proposals are considered, Council Tax is the
balancing figure. The estimated budget gap makes no assumption over future
Council Tax increases as setting the Council Tax is a matter for Council to
decide. 
Each 1% increase in Council Tax will generate an estimated £0.454m in revenue
and increase the weekly Band D bill by £0.30. 
Closing a budget gap of £5.210m (paragraph 4.13.2) would require a 11.5%
Council Tax increase.  If the budget gap increases to £6.448m (paragraph 4.13.3)
an increase of 14.2% would be required. 
Exhibit 18 sets out the impact that increases of 7.5%, 10%. 12.5% and 15%
would have on the budget gap and on the weekly bill for a Band D taxpayer
(assuming they are liable for the full Council Tax charge). 
Exhibit 18: Impact of Council Tax Increases on Revenue and Band D Weekly
Bill
CT Increase 7.5% 10% 12.5% 15%
Band D Weekly Bill Increase (£) 2.25 3.00 3.75 4.50
Net Revenue Benefit (£000) 3,405 4,540 5,675 6,810 
4.14.3 Saving Options – As an alternative to fully closing the budget gap with a Council
Tax increase officers have identified a range of saving options for member
consideration. A number of the saving options submitted for member
consideration have multiple options contained within them. Members are advised
that many of the options have a full time equivalent employee impact. Efforts will
be made to redeploy using the SWITCH Policy or to explore options including
voluntary release. 
The total value of the ‘higher value’ saving options is a recurring saving of
£3.152m in 2026/27 rising to £5.241m in 2027/28 and £5.847m in future years. 
These options are summarised in Appendix 1 with full details of each option set
out in Appendix 2.  
4.14.4 Management Adjustments – Officers have also identified management
adjustments which do not result in either potential redundancies or changes to
policy and can be implemented without political approval. The total value of these
management adjustments is a recurring saving of £0.705m in 2026/27 increasing
to £0.775m in future years.  These options are summarised in Appendix 1 with
full details of each option set out in Appendix 3. 
4.14.5 Sales, Fees and Charges - The Council’s financial planning currently assumes a
5% annual increase in sales, fees and charges which will generate an estimated
£0.295m increase in 2026/27.  This assumption is already built into the 2026/27
budget gap. The Council may wish to consider an option to increase fees and
charges by a higher percentage.  Each further 1% increase in the Council’s fees
and charges would generate approximately £0.060m in income.

Page 19

4.14.6 Use of Reserves (Prudential Target) - On 20 December 2022, the Council
raised the Prudential target from 2% to 3% of net expenditure (after requisitions).
This was done to strengthen financial protection amid significant financial
uncertainty. Although interest rates are projected to fall, easing some risk, there
is ongoing uncertainty about future pay awards and the implications of the
Spending Review which indicates local government will face further real-term
funding cuts in future years. Additionally, the Council has had to use reserves in
recent years due to overspending and, while there are inflationary assumptions
built into future budgets, these are estimates and ongoing geopolitical issues
could result in further inflationary cost pressures. 
4.14.7 The specific amount needed for this reserve changes with each approved budget.
As per Exhibit 19 it is estimated at £6.615m for 2026/27. 
Note that Exhibit 19 makes assumptions over what Council will agree as the
various 2026/27 requisitions and on the levels of saving options and
management adjustments that will be taken. 
4.14.8 Exhibit 19: Estimated 2026/27 Prudential Target 
£,000
Indicative 2026/27 Expenditure Budget (before any saving
options)
326,426
Less Estimated HSCP Requisition (97,600)
Less Estimated West Dunbartonshire Leisure Trust
Requisition
(5,344)
Less Strathclyde Passenger Transport Requisition (1,611)
Less Estimated Valuation Joint Board Requisition (1,108)
Less Estimated Management Adjustments and Savings (2,000)
Net Expenditure  218,763
3% of Net Expenditure (Prudential Target) 6,563 
4.14.9 Based on 2025/26 period 7 projections the forecast unallocated reserves balance
as at 1 April 2026 will be £6.185m which is £0.378m under the estimated 2026/27
3% prudential target. 
4.14.10 Exhibit 20 illustrates the level of reserves that could be released to help balance
the 2026/27 budget if the Prudential Target was reduced to 2.5%. It illustrates
that maintaining the 3% target will require a recovery plan to rebuild the reserves
and that reducing the target to 2.5% would release £0.716m. 
Exhibit 20:  Options to Reduce Prudential Target
Option
2026/27
Target
£000
Forecast
Balance
1/4/2026
£000
Amount Able
to Release
£000
1. Maintain 3% 6,563 6,185 (378)
2. Reduce to 2.5% 5,469 6,185 716

Page 20

4.14.11 
4.15 
4.15.1
It is the S95 Officer’s view that any reduction in the Council’s Prudential Target
should not exceed 0.5% which would leave a policy of maintaining a Prudential
reserve of 2.5% of net expenditure (excluding requisitions). 
Planned Use of Earmarked Reserves 
During 2025/26 changes to revenue budgetary control reports has enhanced the
transparency over the use of earmarked reserves. To further enhance this
transparency, Exhibit 21 provides Council with the current forecast to drawdown
£1.648m of earmarked reserves in 2026/27 to support non-recurring service
expenditure. The projected use is consistent with intended purposes of each
reserve.  Incorporating the use of earmarked reserves to fund designated areas
of expenditure reduces the level of available reserves and Finance will continue
to monitor this and report to Council via existing budgetary control processes. 
Exhibit 21: 2026/27 Forecast Use of Earmarked Reserves
Earmarked Reserve Use of Money 2026/27
Forecast Use
of Reserves
£'000
Revenues and
Benefits 
Non-Domestic Rates system software
developments
13
Business Support To support the creation, sustainability,
and growth of local businesses
62
Organisational
Development &
Change Training 
Defined training needs 9
Equal Pay / Holiday
Pay
Associated legal costs 20
Modern Apprentice  Contribution to modern apprenticeship
programme.
110
Community Renewal
Fund
Premises costs at Levengrove training
centre
9
Employability  Development and delivery of key
employability initiatives to support
vulnerable groups 
201
Cost of Living Cost of living initiatives agreed by
Council
324
Voluntary
Redundancy & Early
Retirement Reserve
Estimated cost of releases due to
2026/27 budget decisions.
500
Smoothing Fund Estimated use of fund to support
delivery of saving options 
400
Total Forecast Use of Earmarked Reserves 1,648 
4.16  Capital Plan Update 
4.16.1 An update of the Council’s 10-year capital plan was approved by Council on 5
March 2025. As part of the capital reporting process implemented 1 April 2024

Page 21

the plan has been reviewed throughout the year with updates reported to Council
and Committee for approval. 
4.16.2 Presentation of Recurring Budgets 
The presentation of the recurring budgets in the Capital Plan (Appendix 5) has
been amended to provide further transparency over the intended use of approved
recurring budgets.  Previous iterations of the Capital Plan have presented
recurring budget lines as single projects with a total annual budget for capital
activity intended to be delivered by the entire budget.   These lines have now
been broken down to show the specific capital activity the recurring budget has
been allocated to (in a ‘sub parent project’) with any residual unallocated budget
shown in the ‘parent’ project. 
By means of illustration, Exhibit 21 shows the presentation of recurring budget
line P&T1 (ICT Modernisation) as previously reported and how it will be reported
going forward.  Exhibit 21 only shows the capital plan up until 2028/29 rather than
the full 10 years to help make the changes easier to see. However, the full details
are included in Appendix 4. 
Exhibit 21: Changes to Presentation of Recurring Budgets 
Previous Presentation
Service Project
Spend
to 31
March
2025
£000
Updated
Budget
2025/26 after
P10 BCR
£000
Budget
2026/27
£000
Budget
2027/28
£000
Budget
2028/29
£000
P&T 1 ICT Modernisation  0 578 459 806 436 
New Presentation
Service Project
Spend
to 31
March
2025
£,000
Updated
Budget
2025/26 after
P10 BCR
£,000
Budget
2026/27
£,000
Budget
2027/28
£,000
Budget
2028/29
£,000
P&T 1
ICT Modernisation
(unallocated)
0 0 0 122 0
P&T 1a PCs for Education 0 126 0 0 119
P&T 1b Laptops for Education 0 162 136 99 33
P&T 1c Chromebooks for Education 0 0 0 307 0
P&T 1d
PCs for Corporate
Employees
0 0 0 17 0
P&T 1e
Laptops for Corporate
Employees
0 167 200 97 161
P&T 1f Mobile Phones 0 0 0 15 0
P&T 1g Public PC Replacement 0 0 0 26 0
P&T 1h Resources 0 123 123 123 123 
4.16.3  In the event that a recurring ‘sub parent project’ is cancelled or reduced, the
capital budget allocated to it will be released back into the ‘parent’ unallocated

Page 22

line. For example, in the illustration above if the 2028/29 budget of £0.161m for
P&T 1e is not required that budget would reduce to £0 and the ‘parent’ P&T1
(Unallocated) budget would increase to £0.161m. 
4.16.4 A further change to the presentation of the capital plan in Appendix 4 is that the
detailed allocations are shown for years 1-5 with years 6-10 consolidated into
one column. This is purely to make the appendix easier to read. Finance will
maintain the more detailed breakdown across all 10 years, which is available on
request.  
4.16.5 There are two appendices to this report in relation to the capital plan. 
• Appendix 4 shows the anticipated spend on projects (revised capital plan)
• Appendix 5 shows the current resources available 
4.16.6 In terms of affordability of the proposed plan, it is the view of the Council’s Senior
Management Team that, while the plan is affordable in 2026/27 assuming a
balanced revenue budget is agreed, it does create significant pressures on the
revenue budget due to the cost of borrowing. Furthermore, it will have revenue
implications for future years and these will require to be planned for through long-
term financial strategies and budget planning processes. This may require the
capital programme to be subject to further review in future if it is deemed to be
placing an excessive pressure on the revenue budget. 
5. PEOPLE IMPLICATIONS 
5.1 The potential staffing implications are shown within the savings options
appended to this report and will be subject to consultation processes where
appropriate and managed in accordance with the Council’s SWITCH Policy
(and Organisational Change Procedure). Efforts will be made to redeploy using
the SWITCH Policy or to explore voluntary release and if required, use of
the redundancy selection policy, including appropriate and equality proofed
selection criteria, as agreed with the trade unions and approved by Corporate
Services Committee in August 2023. 
6. FINANCIAL AND PROCUREMENT IMPLICATIONS 
6.1 The financial implications arising from the budget process are detailed in the
report and appendices. There are no specific procurement implications arising
from this report. 
7. RISK ANALYSIS 
7.1 Some of the capital plan projects have an assumption of match-funding and grant
funding from Scottish Government and other agencies. There is a risk that some
or all of these are not received. The business cases for these projects will require
to be updated as funding becomes clearer, and Members may be required to
consider the financial affordability of continuing with the projects. The risk and
impact of the saving options are detailed in the appendices.

Page 23

8. EQUALITIES IMPACT ASSESSMENT (EIA) 
8.1 A screening was carried out for the budget report as a whole and determined that
an Equality Impact Assessment is not applicable for this report. However, all
individual savings options have been screened and where relevant, impact
assessed. The Equality Impact Assessments are appended to this report
(Appendix 6).   
9. CONSULTATION 
9.1 The views of all Chief Officers have been requested on this report and feedback
reflected herein. Discussions on the issues herein have been undertaken with the
Trade Unions and a summary copy of the saving options was provided to Trade
Unions, political group leaders and communicated to the workforce in the week
commencing 23 February 2026. 
10. STRATEGIC ASSESSMENT 
10.1 Proper budgetary control and sound financial practice are cornerstones of good
governance and support Council and officers to pursue the four strategic
priorities of the Council’s Strategic Plan. 
10.2 The General Services revenue budget contributes to all outcomes by providing
funding in specific areas to help the Council achieve and develop these priorities.   
Laurence Slavin
Chief Officer - Resources
Date:  25 February 2026 
Person to Contact: Laurence Slavin, Chief Officer - Resources, Church Street
Offices, Dumbarton E-mail: laurence.slavin@west-dunbarton.gov.uk 
Appendices: 
Appendix 1 – Summarised Saving Options and Management Adjustments
Appendix 2 – Detailed Saving Options
Appendix 3 – Detailed Management Adjustments
Appendix 4 – Capital Plan – 2026/27 – Proposed Spend  
Appendix 5 – Capital Plan – 2026/27 – Proposed Resources  
Appendix 6 – Equality Impact Assessments
Background Papers: Budget Report to Council - 5 March 2025
Financial Update Report to Council – 18 June 2025
Financial Update Report to Council – 29 October 2025
Financial Update Report to Council – 17 December 2025

Page 24

Appendix 1 – Summarised Saving Options and Management Adjustments 
2026/27 BUDGET - SAVING OPTIONS         
2026/27 2027/28 2028/29
Ref: CO Saving Option Saving
(£,000)
FTE Saving
(£,000)
FTE Saving
(£,000)
FTE
2627 CCF02 AG Review of Clydebank Town Hall  15 0 15 0 15 0
2627 CCF03 AG Review of Contact Centre 15 1 30 1 30 1
2627 CCF08 AG Full Cost school meals 361 0 761 0 761 0
2627 CCF09 AG Reduce Performance and Strategy Team 25 1 60 1 60 1
2627 CCF10 AG WDLT Management Fee 253 0 253 0 253 0
2627 CCF11 AG Removal of events 5 0 28 0 28 0
2627 EDU04 GH Swimming Lessons 14 0 14 0 14 0
2627 EDU05 GH Early Start Clubs 67 0 102 0 102 0
2627 EDU08 GH Charging for Instrumental Music Tuition 0 0 67 0 100 0
2627 EDU09 GH Closure of Out of School Care 29 2 29 2 29 2
2627 EDU11 GH Mainstream School Transport 0 0 80 0 120 0
2627 EDU12 GH Instrumental Music Service  23 0.4 23 0.4 23 0.4
2627 EDU13 GH Secondary School Common Senior Phase
Timetable
0 0 236 5 354 5
2627 EDU14 GH Secondary School Staffing 0 0 368 7.8 552 7.8
2627 EDU15 GH Senior Phase Transport 44 0 67 0 67 0
2627 EDU17 GH Reduce Day and Residential School Budget 150 0 200 0 200 0
2627 EDU19 GH Reduction in Management Funding for ELC
provision
46 0 69 0 69 0
2627 EDU20 GH Reduction in Temporary Teaching Posts 228 5 345 5 345 5
2627 EDU23 GH Roll related Clerical Hour Allocation   60 2 90 3 90 3
2627 HE01 PB Homelessness Budget – Cessation of
Rotation of Temporary Accommodation 
10 0 10 0 10 0
2627 HE02 PB CCTV Team 27 2 54 2 54 2

Page 25

2627 PT01 VR Review leadership support and explore
transfer to CAS
0 0 49 1 49 1
2627 PT10 VR Charges for Disclosure Scotland Passed to
Employees / Applicants
26 0 26 0 26 0
2627 PT11 VR Reduction in Corporate Training Budget 15 0 15 0 15 0
2627 RES01 LS Review External Funding 645 0 645 0 645 0
2627 RES04 LS Review of Office Accommodation 25 0 50 0 50 0
2627 RES14 LS Review Elderly Welfare Grant  110 0 120 0 120 0
2627 RES15 LS Review Community Council Funding 14 0 14 0 14 0
2627 RES18 LS National Fraud Initiative Single Person
Discount Review
16 0 20 0 20 0
2627 RES19 LS Close Municipal Buildings 16 0 65 0 65 0
2627 RES20 LS Review of depot rental charges 75 0 75 0 75 0
2627 RES21 LS Council Tax on Long Term Empty and
Second Homes
225 0 225 0 225 0
2627 RN01 GM Closure of Bowling Clubs 40 0.5 66 0.5 81 0.5
2627 RN04 GM Street Lighting 18 0 126 0 126 0
2627 RN05 GM Working 4U 245 12 490 12 490 12
2627 RN06 GM Crematorium Weekend Operations 5 0 5 0 5 0
2627 RN07 GM Reduction in Street Cleaning 27.5 2 55 2 55 2
2627 RN08 GM Introduction of Parking Charging 0 0 0 0 216 0
2627 RN09 GM Reduce number of Apprentices   115 5 115 5 115 5
2627 RN10 GM Cease supply and installation of Christmas
Trees
15 0 15 0 15 0
2627 RN11 GM Street Sweeping and Litter Collection of
Trunk Road
50 0 50 0 50 0
2627 RN14 GM Purchase of vehicles to replace hire cars 20 0 37 0 37 0
2626 RN15 GM Cease supply of dog waste bags  25 0 25 0 25 0
2627 RR01 AD Communities Team  42 1 42 1 42 1
2627 RR08 AD Assistance to Business 10 0 10 0 10 0  
TOTAL 3,151.5 33.9 5,241 48.7 5847 48.7

Page 26

2026/27 BUDGET - MANAGEMENT ADJUSTMENTS       
2026/27 2027/28 2028/29
Ref: CO Saving Option Saving
(£,000)
FTE Saving
(£,000)
FTE Saving
(£,000)
FTE
2627 CCF12 AG Facilities Management Operating Model 250 TBC 250 TBC 250 TBC
2627 CCF13 AG Deletion of vacant Facilities Management
support post 
40 1 50 1 50 1
2627 EDU18 GH Right size Free School Meal, Alternative
Holiday Payments and School Clothing
Grant budgets
128 0 128 0 128 0
2627 EDU24 GH ELC Education Support Officer Post 18 0.5 28 0.5 28 0.5
2627 PT06 VR 365 Licence Savings 60 0 60 0 60 0
2627 PT07 VR Reduce ICT Support 32 1 32 1 32 1
2627 RN12 GM Separation of Garden/Food Waste 50 0 100 0 100 0
2627 RR02 AD Secondment to Clydebank
Neighbourhood Board
42 0 42 0 42 0
2627 RR03 AD Capacity Funding - Plan For
Neighbourhoods
34 0 34 0 34 0
2627 RR06 AD Planning, Environmental Health and
Building Standards 
15.5 0 15.5 0 15.5 0
2627 RR07 AD Business Gateway  10 0 10 0 10 0
2627 RR09 AD Merger of Manager Roles – Legal and
Democratic Services
25 0 25 0 25 0  
TOTAL 704.5 2.5 774.5 2.5 774.5 2.5