ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 26 SEPTEMBER 2024
EARMARKED RESERVES REVIEW  
1. EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide Council with the outcome of a review
undertaken of all earmarked reserves currently held. The review looked at
whether each Earmarked Reserve is still required for the originally intended
purpose and asked Services to provide updated plans of spend. 
1.2 There are 2 categories of Earmarked Reserves that could be released and result
in a one-off transfer to the General Fund:
 The first relates to those that are no longer required and could be a direct
one-off transfer to the General Fund with no other consequences. These
total £1.444m.
 The second relates to those that can be transferred to the General Fund on
a one-off basis but will also result in a smaller recurring cost pressure to
be included within the Budget Outlook as there is still a requirement to
deliver on elements of the original plans on a recurring basis. These total
£0.114m with a recurring cost pressure of £0.023m. 
1.3 If agreed by Members, this would mean that £1.558m could be released back to
the General Fund to contribute towards bridging the significant budget gap in
2025-26 with a cost pressure of £0.023m also required on a recurring basis.
Overall resulting in a net reduction to the budget gap in 2025-26 of £1.535m and
an increase to the gap in subsequent years of £0.023m.
1.4 The review also considered the use of expiry dates being applied to Earmarked
Reserves and includes presentational recommendations to improve reporting.

Page 2

ARGYLL AND BUTE COUNCIL COUNCIL
FINANCIAL SERVICES 26 SEPTEMBER 2024
EARMARKED RESERVES REVIEW  
2. INTRODUCTION 
2.1 This report summarises the outcome of a review undertaken of all earmarked
reserves. The review looked at whether the reserves are still required for the
originally intended purpose and asked Services to provide updated plans of
spend.  
2.2 There are 2 categories of Earmarked Reserves that could be released and result
in a one-off transfer to the General Fund, those that are a direct transfer with no
other consequences and those that can be transferred but will also result in a
recurring cost pressure to be included within the Budget Outlook.  
3.  RECOMMENDATIONS 
3.1 Members are asked to: 
(a) Approve that the Earmarked Reserves detailed in Appendix 2 totalling
£1.444m be released to the General Fund to help bridge the budget gap in
2025-26.
(b) Approve that the Earmarked Reserves detailed in Appendix 3 totalling
£0.114m be released to the General Fund to help bridge the budget gap in
2025-26 and that cost pressures totalling £0.023m are included in the next
update of the Budget Outlook.
(c) Note that expiry dates have been added for all earmarked reserves and
agree that the default position is that any earmarked reserves that have not
been fully utilised by that date will be returned to the General Fund unless
otherwise agreed by the Executive Leadership Team (ELT), in consultation
with the Leader and Deputy Leaders. 
(d) Approve the non-financial amendments to the presentation of the
Earmarked Reserves as outlined at section 7.1.  
4.  CURRENT EARMARKED RESERVES 
4.1 As reported to Policy and Resources Committee on 15 August 2024, the current

Page 3

balance of Earmarked Reserves is £119.246m. This includes: 
 £60.078m invested or committed for major initiatives/capital projects.
 £28.359m that has still to be drawn down in 2024-25.
 £30.809m planned to be spent in future years. 
4.2 As part of the review Services have been asked to include expiry dates for each
earmarked reserve. The default position is that any earmarked reserves that have
not been fully utilised by that expiry date will be returned to the General Fund
unless Services are able to provide robust justification to extend their use which
must be agreed by the Executive Leadership Team (ELT) in consultation with the
Leader and Deputy Leaders. Appendix 1 details all the current Earmarked
Reserves for information including the expiry dates.  
5. OUTCOME OF REVIEW 
Release to the General Fund
5.1 The review identified 11 earmarked reserves that could be released back to the
general fund as they are no longer required for the original intended purpose.
These total £1.444m and are summarised in the table below with further detail of
why they can be released included in Appendix 2.
Service Description Value
Education Expansion of Free School Meals 832,678
Education Languages 1+2 37,478
Education Cashless Catering Project 20,000
Education  Condition Surveys 1,815
Education Drama Production Transport 605
Customer Support
Services
Modern Apprentices 40,000
Development &
Economic Growth
Scottish Government Islands Programme 1,055
Development &
Economic Growth
Staycation and Marketing 62,386
Roads &
Infrastructure
Management Information System 28,099
Roads &
Infrastructure
Bin Replacement Programme 1,455
Non-Departmental COVID Funding 418,337  
1,443,908

Page 4

Release to the General Fund with associated Cost Pressure 
5.2 In addition to the above there were a further 3 earmarked reserves that have an
ongoing pressure that requires funding. It is recommended that they also be
released back to the General Fund and an associated cost pressure of £0.023m
be incorporated into the budget outlook in relation to these. 
These total £0.114m and are summarised in the table below with further detail
included in Appendix 3.
Service Description Value
Legal & Regulatory
Support
Hybrid Council Meetings (recurring cost
pressure of £12k to be built into outlook
instead to maintain ICT equipment)
31,302
Legal & Regulatory
Support
Debt Counselling & Welfare Rights
(recurring cost pressure of £6k to be built
into outlook instead to maintain system)
15,452
Non –Departmental Community Resilience Fund (Recurring
cost pressure of £5k to be built into
outlook instead)
66,999  
113,754 
6. IMPACT ON BUDGET POSITION
6.1 There is a significant budget gap over the next five years as reported to Policy
and Resources Committee on 15 August 2024. The release of these earmarked
reserves in 2024-25 could be utilised to help bridge the budget gap on a one-off
basis in 2025-26, with the small cost pressure having a recurring impact. This is
outlined in the table below. 
2025-26
£000
2026-27
£000
2027-28
£000
2028-29
£000
2029-30
£000
Budget Gap as
reported to P&R
Committee
(9,484) (13,730) (19,610) (22,693) (26,504)
EMR’s released to
General Fund with no
cost pressure 
1,444 0 0 0 0
EMR’s released to
General Fund with cost
pressure
114 0 0 0 0
Cost Pressure (23) (23) (23) (23) (23)

Page 5

Revised Budget Gap (7,949) (13,753) (198,633) (22,716) (26,527) 
7. OTHER AMENDMENTS TO EARMARKED RESERVES
7.1 As part of the review other amendments were identified which require Members
approval which have no financial impact on the Earmarked Reserves position.
The majority of these changes relate to combining a number of Earmarked
Reserves where the purposes are similar whilst retaining the detail within the
narrative. These are detailed in Appendix 4.  
8. CONCLUSION
8.1 A review of all Earmarked Reserves has identified that, if agreed by Members,
£1.558m could be released back to the General Fund to contribute towards
bridging the significant budget gap in 2025-26 with a cost pressure of £0.023m
also required on a recurring basis. Overall resulting in a net reduction to the
budget gap in 2025-26 of £1.535m and an increase to the gap in subsequent
years of £0.023m.
8.2 Expiry dates have been added to all Earmarked Reserves and any that are not
fully utilised by the date stated will be returned to the General Fund unless
otherwise agreed by ELT in consultation with the Leader and Deputy Leaders.
There are also some presentational amendments to the reporting of earmarked
reserves for consideration. 
9. IMPLICATIONS 
9.1 Policy – None.
9.2 Financial – Outlines the Earmarked Reserves that could be released to the
General Fund and the impact this would have on the budget gap in future years.
9.3 Legal - None.
9.4 HR - None.
9.5 Fairer Scotland Duty -  None.
9.5.1 Equalities – protected characteristics - None.
9.5.2 Socio-economic Duty - None.
9.5.3 Islands - None.
9.6 Climate Change - None.
9.7 Risk - None.
9.8 Customer Service - None.
9.9 The Rights of the Child (UNCRC) - None.   
Kirsty Flanagan
Executive Director/Section 95 Officer
19 August 2024

Page 6

Policy Lead for Finance and Commercial Services:  Councillor Ross
Moreland
APPENDICES:
Appendix 1 – 2024-25 Earmarked Reserves
Appendix 2 – Earmarked Reserves considered for release to the General Fund
Appendix 2 – Earmarked Reserves considered for release to the General Fund
with associated cost pressure
Appendix 4 – Presentational amendments to Earmarked Reserves
For further information contact Anne Blue, Head of Financial Services
anne.blue@argyll-bute.gov.uk

Page 7

APPENDIX 1 - 2024-25 EARMARKED RESERVES
Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
001 Chief Executive's Unit Community
Planning
Service Concessions - Priorities Investment
Fund (Area Plans)
200,000 As agreed by Policy and Resources Committee on 23 October 23 - drawdown of £200,000 from the Priorities Investment
Fund to fund two temporary posts and associated costs to produce meaningful area plans
100,000 100,000 0 31/03/2026
002 Chief Executive's Unit Community
Planning
NHS Highland and other CPP Partners
Contribution Towards the CPP Running and
Project Costs
83,368 Will be deployed as required in the day-to-day running of the Community Planning Partnership's operations. 83,368 0 0 31/03/2025
003 Chief Executive's Unit Community
Planning
Community Planning - temp post to
support communities
55,000 Post relating to the supporting communities fund, will be used in 2024-25+V6P6:WP6:U6 55,000 0 0 31/03/2025
004 Chief Executive's Unit Community
Planning
Covid impacts – support to communities’ 27,926 Funding provided in relation to the Local Self-Isolation Assistance Service.  The Community Planning and Development
Team will work with community groups to support their community response and resiliency to Test and Protect and the
longer term impacts of COVID-19 on local community organisations.
27,926 0 0 31/03/2025
005 Chief Executive's Unit Community
Planning
Gaelic Development 27,490 To fund Gaelic specific work and project work of the Community Planning Partnership including the development of the
new 10 year Outcome Improvement Plan
27,490 0 0 31/03/2025
006 Chief Executive's Unit Community
Planning
Communities and Partnership Team 8,855 The funds have originated from externally sourced income due to an employee being seconded to the Scottish
Community Development Centre (SCDC).  The funds will be used to support the team in relation to meeting its priorities
of Building Back Better (Communities), Climate Change and the review of the Argyll and Bute Outcome Improvement
Plan.
8,855 0 0 31/03/2025
007 Chief Executive's Unit Community
Planning
Recovered unspent third sector grant
funding.
2,937 To be distributed through the Supporting Communities Fund for communities based projects across Argyll and Bute. 2,937 0 0 31/03/2025
008 Executive Director
(Douglas Hendry)
Across Services /
Commercial
Services
Information Management (Estates Survey
Work)
12,697 To support a number of initiatives in respect of improving the Council's information management in line with the
transformation agenda and increasing the pace of change as outlined in the BV Review.  The planned initiatives include:
Estates Survey work £122k, Digitalisation of Title Deeds £92k, document management and workflow system for
Planning, Building Standards and Environmental Health £77k and a balance of funding to explore information
management solutions in a strategic and coherent way £209k. This balance relates to Estates Survey Work. Having a
procured supplier to provide floor plans at short notice is required to be able to react quickly to requests. If this isn't
available Estates would need to go through the procurement process again which would delay any projects by several
months. There isn’t a detailed plan to use this resource it is more about being able to react quickly and not delay
projects.
12,697 0 0 31/03/2025
009 Executive Director
(Douglas Hendry)
Across Services /
Education
Digital Projects (Supply Staff Booking
System)
15,200 To deliver a number of Digital Service Transformation Projects with a commitment of £0.035m towards a Supply Staff
Booking system.  Phase 1 of the project is nearing completion.
9,900 5,300 0 31/03/2026
010 Executive Director
(Douglas Hendry)
Commercial
Services
Rothesay Pavilion Charity 750,000 Agreed at Council meeting February 2020, £750k additional revenue support subject to conditions which seek to
minimise the risk to the Council as far as is reasonably practicable including requirement for adequate business and
financial management and regular reporting by RPC.  This funding is to support Rothesay Pavilion Charity in the first 2
years of the building being operational.
0 750,000 0 TBC
011 Executive Director
(Douglas Hendry)
Commercial
Services
Climate Change Programme 450,000 At the Council Budget meeting on 24 February 2022, the Council committed to additional investments with £0.500m for
Climate Change, building on previous £1.1m investments, including projects within Argyll and Bute’s schools. 
Expenditure in 23/24, draw down in 24/25.
450,000 0 0 31/03/2025
012 Executive Director
(Douglas Hendry)
Commercial
Services
Rothesay Pavilion Essential repairs 306,400 Essential repairs to deal with potential health and safety risks and to avoid further deterioration.  Budget provision was
approved by the Policy and Resources Committee on 21 August 2014.  
0 306,400 0 TBC
013 Executive Director
(Douglas Hendry)
Commercial
Services
Energy Efficiency Fund 238,351 The Central Energy Efficiency Fund (CEEF) was launched by SG in 2004 to support the delivery of energy efficiency and
renewable energy measures.  The original  allocation of funding was £286k and part of the stipulation of the funding was
that any savings from energy efficiencies were reinvested into the fund in energy efficiency measures.  The terms and
conditions attached to the fund expired on 31 March 2016, however there is an expectation that local authorities will
maintain a revolving energy efficiency fund to support future carbon reducing projects. Projects expected to commence
in 24-25 are Drainage Adaptations, Water Efficiency Works within PCs and Schools and Remote Energy Monitoring
Systems. Additional funds from over recovery of Renewable Energy Income.
238,351 0 0 31/03/2025
014 Executive Director
(Douglas Hendry)
Commercial
Services
Commercial Investment Manager post and
specialist consultant technical resource
(previously Asset Management Fund)
104,000 The Asset Management Fund has been redirected to Capital going forward but the interest for 2023-24 is to be used
towards a Commercial Investment Manager Post.  This is because funding of £200k from the Asset Management Fund
was agreed at ELT in June 22 for the post, along with specialist consultancy and technical resources  that will be required
to support early projects.  Note, the  £104k represents the balance of the £200k commitment.
104,000 0 0 31/03/2025

Page 8

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
015 Executive Director
(Douglas Hendry)
Commercial
Services
Estates - NDR Revaluation Appeals 59,938 The Council agreed to make provision to meet the cost of appealing Non Domestic Rates (NDR) revaluations which were
imposed from April 2017. The remaining funds were carried forward to the 2023/24 revaluation cycle however a recent
change in position by the Scottish Government may restrict the appeals which can be made. This is still under discussion
and Gerald Eve Surveyors have been appointed as specialist advisers on this matter, who are progressing 2023-26
appeals. In the event that appeals are limited there may be an opportunity to utilise Gerald Eve for more general
valuation advice subject to Procurement approval.
29,969 29,969 0 31/03/2026
016 Executive Director
(Douglas Hendry)
Commercial
Services
Mid Argyll Community Pool 30,000 At the Council Budget meeting on 22 February 2024, the Council committed to a one-off investment of £0.030m to Mid
Argyll Community Pool in response to an external funding request.
30,000 0 0 31/03/2025
017 Executive Director
(Douglas Hendry)
Commercial
Services
MacTaggart Leisure Islay 30,000 At the Council Budget meeting on 22 February 2024, the Council committed to a one-off investment of £0.030m to
MacTaggart Leisure, Islay in response to an external funding request.
30,000 0 0 31/03/2025
018 Executive Director
(Douglas Hendry)
Commercial
Services
Site Investigation Works 21,013 For Site Investigation works in relation to Tweeddale Street Car Park and Oban Airport Business Park, exploring
commercial opportunities to develop the sites and raise revenue income for Argyll and Bute Council. HUB North were
instructed to procure contractors to undertake the site investigations these are now complete. The remainder of the
budget is intended to be utilised for other site investigation and pre-development works to further develop commercial
opportunities across the council area.
21,013 0 0 31/03/2025
019 Executive Director
(Douglas Hendry)
Commercial
Services
Free Sanitary Provision Scheme 7,114 To fund the continued implementation of the scheme through increased provision of reusable products, improved
provision in rural communities by working in partnership with Education and improving the storage of products in toilets
so that they are more readily available. A dedicated officer was appointed in November 2022 to develop the scheme and
increase provision across Argyll and Bute including a postage facility.
7,114 31/03/2025
020 Executive Director
(Douglas Hendry)
Education EDU - Early Learning & Childcare - 1140
Hours Expansion
4,738,997 The funds will be utilised to improve and expand the Argyll and Bute Early Years Delivery Plan for 1140 hours which will
increase access to affordable Early Learning and Childcare across the Council area. There is a detailed plan of spend
which has been shared with S95 officer and Head of Finance.  The Scottish Government were happy for us to move
ahead with plan instead of losing funding.  For 2024-25 the ring fencing has been removed, however the wording of the
letter states funds must still be used for Early Years.
2,373,716 2,365,281 0 31/03/2026
021 Executive Director
(Douglas Hendry)
Education ASN Review 1,255,000 To fund capital costs of ASN adaptations as part of ASN Review to increase equity of provision across Argyll and Bute. 
This will be subject to a business case as part of the wider ASN review. Update: Business case now approved and
working group set up with quotes for works being carried out Jan 2024.
565,000 690,000 0 14/08/2025
022 Executive Director
(Douglas Hendry)
Education Expansion of Universal Free School Meals 1,228,663 To support the continued phased implementation of Universal Free School Meals for Primary children. 395,985 0 0 31/03/2025
023 Executive Director
(Douglas Hendry)
Education Provision for Learning Estate Investment
Programme
1,000,000 At the Council Budget meeting on 24 February 2022, the Council committed to additional investments - £1m to help
safeguard and support future learning for Argyll and Bute's Learning Estate Investment programme. Update: The LEIP
funding bid was approved by SG late 2023. Council approval granted at 25th April 2024 meeting to commence business
case, undertake engagement exercises and site selection process.
1,000,000 0 0 31/03/2025
024 Executive Director
(Douglas Hendry)
Education Reduced Teacher Staffing Costs - Strike
Action
800,000 To fund one off savings in 2024-25 from the underspend in staffing from strike action. 800,000 0 0 01/04/2024
025 Executive Director
(Douglas Hendry)
Education DSM - Devolved School Management
Scheme
644,837 To be spent in accordance with DSM regulations. 644,837 0 0 31/03/2025
026 Executive Director
(Douglas Hendry)
Education 21-22 Unspent Budget within DSM
Earmarkings
93,294 Additional unspent budget earmarkings included within 21-22 DSM balance. Remaining balance will fund ASN
adaptations and Lead Teacher/Virtual Head Teacher post.
93,294 0 0 31/03/2025
027 Executive Director
(Douglas Hendry)
Education 100 Day Promise - Increase Teacher and
Pupil Support Assistant Numbers
732,164 Scottish Government initiative to increase the number of teachers and support assistants in schools. Required to fund
teachers to end of academic year.
457,602 274,562 14/08/2025
028 Executive Director
(Douglas Hendry)
Education Logistics Funding - Safe Opening of Schools 500,000 Scottish Government funding to ensure the safe opening and operation of schools. Includes transport, PPE, cleaning,
ventilation and expansion of estate. It is likely that any unused balances would have to be returned to the Scottish
Government. Window replacement programme in schools with windows that do not open, this will improve ventilation. 
£500k to fund one off savings 2024-25.
500,000 0 0 01/04/2024
029 Executive Director
(Douglas Hendry)
Education Access to Counsellors in Schools 375,251 Government initiative to support delivery of the access to school counselling service, in line with the commitment set
out in Programme for Government. The delivery of the service will enable children and young people to be supported
with issues affecting their mental health and wellbeing. The service is currently seeking the views of head teachers
around the need for increased counselling for under 10s.  Service is also engaged in multi-agency discussions around the
development of a single point of access and the School Counselling monies will help support the development of this in
collaboration with HSCP.
100,000 275,251 0 14/08/2025
030 Executive Director
(Douglas Hendry)
Education Additional Teaching/Support in
Schools/Digital Devices/Family Home
Learning Support Fund - £45m Grant
351,174 Continuation of funding for additional staffing, teachers, support staff, additional devices for pupils and additional
family/home learning programmes.
42,552 308,622 0 01/04/2024
031 Executive Director
(Douglas Hendry)
Education Pupil Equity Fund Carry Forward 310,216 To provide targeted support for children and young people affected by poverty to achieve their full potential.  Funding is
used over the academic year.
310,216 0 0 14/08/2024

Page 9

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
032 Executive Director
(Douglas Hendry)
Education Additional Support Needs - Additional
Support for Learning Project
307,868 Government initiative to support the provision of support staff in schools as part of 'Support for Additional Support for
Learning Implementation'. The funding will be used to supplement the ASN Assistants budget 24-25 by funding
additional support need hours required due to a lack of local specialist provision in some areas, as well as for vital
training for visual and hearing impairment specialists which a significant number of Argyll and Bute's children require.
169,580 138,288 0 14/08/2025
033 Executive Director
(Douglas Hendry)
Education (2023 Digital Projects) School WiFi
Upgrades
166,924 To extend WiFi coverage within school settings through the purchase of additional hardware such as access points,
switches and other networking hardware. This will result in more flexible learning spaces and support the growing
number of devices within schools. Project now underway and if budget not fully utilised it is hoped that the balance
could be diverted to assist with Capital costs of Education Network Paper.
166,924 0 0 31/03/2025
034 Executive Director
(Douglas Hendry)
Education Education Transformation Fund 144,637 At the Council meeting on 27 February 2020, it was agreed to input £400k into Education Digital Learning.  The
additional funds have been spent in 20/21, 21/22 and 22/23 as part of the ongoing transformation work in the
Education service, focussing on digital and virtual learning technology and the development of learning clusters. 
0 144,637 0 Going to
Education
network
035 Executive Director
(Douglas Hendry)
Education Strategic Equity Fund 94,712 Strategic Equity Funding must provide targeted support for children and young people (and their families if appropriate)
affected by poverty to achieve their full potential, focusing on targeted improvement activity in literacy, numeracy and
health and wellbeing. The Strategic Equity Fund Spending Plan will enhance staffing, provide teacher cover and support
to schools not in receipt of PEF funding, to be spent by the end of the 2024-25 academic year.
94,712 31/03/2025
036 Executive Director
(Douglas Hendry)
Education MCR Pathways Pilot 80,000 Funding to support implementation of MCR Pathways mentoring programme within three secondary schools for 2023-
24 academic year. Funding will allow the employment of a dedicated Co-ordinator within each setting to develop and
implement the programme which is designed to benefit care experienced and other disadvantaged pupils through
targeted mentoring support.
80,000 0 0 31/03/2025
037 Executive Director
(Douglas Hendry)
Education Scottish Milk and Healthy Snack Scheme
(SMHSS)
68,061 The Scottish Milk and Healthy Snack Scheme funds a daily portion of plain fresh cow’s milk (or specified alternative) and
a healthy snack (fruit or vegetables) for pre-school children spending 2 hours or more in the care of a regulated day care
provider and/or childminders that has registered for the Scheme.  The unspent grant from 2023/24 will contribute
towards the cost of the scheme in 2024/25.
68,061 31/03/2025
038 Executive Director
(Douglas Hendry)
Education Education to Support Young People 54,817 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.600m.  Agreed to fund a package
of measures to boost the wellbeing and build back the resilience of young people, in particular those most vulnerable,
following the Covid-19 pandemic, including counselling and increased provision of childcare for children under three.
Remaining balance is funding a teaching post, an outreach worker and training to support schools in 24-25. 
54,817 0 0 31/03/2025
039 Executive Director
(Douglas Hendry)
Education Scottish Government Initiatives:
Developing the Young Workforce
GIRFEC
Languages 1+2
37,478 Developing the Young Workforce: Developing an Argyll and Bute foundational apprenticeship scheme, developing
support for vulnerable young people to access training, developing key group knowledge of the local labour market in
relation to post-school opportunities and delivering a prevocational programme for unemployed young people.  Grant
received from the Scottish Government for this purpose.  GIRFEC: This grant funding is for the specific purpose of
supporting Argyll and Bute’s contribution to implementing GIRFEC and the Children and Young Person (Scotland) Act to
ensure compliance with legislation.  Activity in Argyll and Bute will include developing specific resources, staff training
and development, protocols and procedures in line with the GIRFEC practice model and national guidelines.  Languages
1+2: Grant provided for implementing  the Scottish Government's 1+2 languages policy for Primary schools.  The
Scottish Government have confirmed that any unspent funding can be put into reserves for spend later. 
0 0 0 31/03/2025
040 Executive Director
(Douglas Hendry)
Education EDU - Music Instructors 36,094 Scottish Government Initiative to support music tuition. Unspent amount designated for expansion of the service within
the 2023-24 academic year.
36,094 31/03/2025
041 Executive Director
(Douglas Hendry)
Education Youth Music Initiative 34,348 To fund YMI projects across the remainder of the academic year 2023/24. 34,348 31/03/2025
042 Executive Director
(Douglas Hendry)
Education Gaelic Specific Grant 30,000 Gaellic Specific Grant £30k - This earmarking refers to the Council contribution towards the Gaelic grant for 22-23 and
will fund the costs of Gaelic Language Principal Teacher in 24-25 academic year.
30,000 0 0 14/08/2025
043 Executive Director
(Douglas Hendry)
Education (2023 Digital Projects) Cashless Catering 30,000 To support the ongoing implementation of the new cashless catering system during the testing and roll out phase. 10,000 0 0 31/05/2024
044 Executive Director
(Douglas Hendry)
Education Languages 1 + 2 28,056 Languages 1+2: Grant provided for implementing  the Scottish Government's 1+2 languages policy for Primary schools. 
The Scottish Government have confirmed that any unspent funding can be put into reserves for spend later and will
fund the costs of Gaelic Language Principal Teacher in 24-25 academic year.
0 28,056 0 14/08/2025
045 Executive Director
(Douglas Hendry)
Education Schools ADP Grant 19,000 Providing social and emotional support to pupils who are affected by drugs and alcohol.  Funding previously provided by
NHS for ADP work - we now have agreement from them to use the funding towards the Planet Youth project which will
be opened up to secondary schools in 2024-25.
19,000 0 0 31/03/2025

Page 10

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
046 Executive Director
(Douglas Hendry)
Education Scottish Attainment Challenge - Care
Experienced CYP Funding
13,881 To provide targeted support for care experienced children and young people to achieve their full potential. The balance
funds a Virtual Head Teacher and Health and Wellbeing Family Support Workers. Earmarked funding is allowing the
Virtual HT to create impact both within Education but also to drive forward work around The Promise across partners
and other services.
13,881 0 0 14/08/2024
047 Executive Director
(Douglas Hendry)
Education Bord Na Gaidhlig - Parental/Community
Gaelic Upskilling Project
12,720 This funding was used for Gaelic Classes and Support being delivered in the academic year 21/22. An issue with invoicing
at the supplier end has delayed the payment for this project and discussions are ongoing between the service and the
supplier to resolve. A new invoice has been requested by the end of 23/24. Invoice of £4,000 has been paid for this and
the remaining balance of £8,720 will be returned to BNG. 
12,720 0 0 31/03/2025
048 Executive Director
(Douglas Hendry)
Education Training of Support Staff in Schools 12,000 To fund training of support staff in schools in light of the findings of the Behaviour in Scottish Schools Research 2023 12,000 31/03/2025
049 Executive Director
(Douglas Hendry)
Education Skype for Business for Education / Digital
Projects (Skype for Business)
10,000 To fund the initial capital costs for the implementation of Skype for Business for Education.  This will bring the Education
service in line with other council departments and will improve staff collaboration and modernise school telephony to
deliver the  service more efficiently and cost effectively.
0 10,000 0 31/03/2025
050 Executive Director
(Douglas Hendry)
Education Planet Youth Funding 4,350 Balance of 23-24 grant funding to be used for drama production within schools taking place in September 2024. 4,350 01/10/2024
051 Executive Director
(Douglas Hendry)
Education EDU - Support Fund for Service Children 3,557 This grant is provided by the Armed Forces Covenant Trust and will be used to provide continuing support and resources
for Service Children within the Helensburgh and Lomond Area in academic year 23-24.
3,557 31/03/2025
052 Executive Director
(Douglas Hendry)
Education Education Learning Estate Condition
Surveys
1,815 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for prioritised School Buildings. 0 0 0 31/03/2025
053 Executive Director
(Douglas Hendry)
Education Play on Pedals 1,584 Unspent Play On Pedals grant to allow the procurement of a fleet of cycles and helmets to support delivery across up to
19 nurseries, as well as other equipment and maintenance.
1,584 31/03/2025
054 Executive Director
(Douglas Hendry)
Education Food for Thought 1,203 Ardrishaig Primary £800 and Gigha Primary & ELC £403 have orders pending and plans for the remaining balance of the
Food for Thought Grant.  Will be spent in 2024-25
1,203 31/03/2025
055 Executive Director
(Douglas Hendry)
Education Transport for 'Smoke Free Me' Drama
Production
605 NHS funding contribution towards the cost of school transport for pupils attending the Smoke Free Me drama
production which was delivered across Argyll and Bute. Balance to be put towards Sept 2024 production.
0 0 0 11/08/2024
056 Executive Director
(Douglas Hendry)
Education Developing The Young Workforce 598 The Developing the Young Workforce Grant claim had to be made in advance and at the end of the financial year there
was surplus of £598 which requires to be carried forward.
598 31/03/2025
057 Executive Director
(Douglas Hendry)
Legal & Regulatory
Support
Meridian BCMS (Business Continuity
Management System)
57,176 Meridian BCMS (Business Continuity Management System)
For period covering: 19th February 2024 – 18th February 2027
Civil Contingencies System, this earmarking will be used over the next 6 years for maintenance costs for Meridian BCMS
19,800 19,800 17,576 31/03/2027
058 Executive Director
(Douglas Hendry)
Legal & Regulatory
Support
LRS - Housing Services - Welfare Rights 43,760 Grant agreement between the Improvement Service and Argyll and Bute Council for participation in the Welfare Advice
and Health Partnerships- ‘Test and Learn’ Programme
43,760 31/03/2025
059 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
Education Purchasing Officers 210,000 The earmarked funds will be used to fund an education purchasing team within the Procurement Service for two years. 
The team will embed good procurement practice, train headteachers on current procurement process requirements,
develop spend plans that evidence best value.
168,000 42,000 0 30/06/2025
060 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
CCTV Maintenance 95,331 Maintenance of CCTV systems.  Funds transferred from external bodies (Police Scotland) to maintain systems for future
years Council Decision of 20 Sept 2007.  Merged with funds from Community Safety Partnership to be used for
Community Safety Partnership purposes.
47,500 47,831 0 Ongoing
061 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
Information Management (Digitalisation of
Title Deeds)
92,000 To support a number of initiatives in respect of improving the Council's information management in line with the
transformation agenda and increasing the pace of change as outlined in the BV Review.  The planned initiatives include:
Estates Survey work £122k, Digitalisation of Title Deeds £92k (delay on spending due to COVID-19), document
management and workflow system for Planning, Building Standards and Environmental Health £77k and a balance of
funding to explore information management solutions in a strategic and coherent way £209k
20,500 51,000 20,500 31/12/2026
062 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
Welfare Rights Support 66,728 As agreed at the Council Meeting on 25 February 2021 - an allocation of £0.172m.  As part of our focus on Improving
Opportunities for People and Communities, agrees to provide additional resources to proactively support people
experiencing poverty and hardship, by investing in two additional Welfare Rights support staff for two years.
66,728 0 0 31/03/2025
although if
funding
continues this
will be a
rolling  fund.
063 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
(2023 Digital Projects) Replacement of
Council Chambers Online Meeting
Equipment
50,071 Current online meeting system  is less than resilient and has failed on a number of occasions, leading to issues at
strategic committees. A condition assessment by the incumbent maintenance contractor has highlighted that the
current equipment is now at end of life and unsupportable due to the  obsolescence of the system. Discussions with ICT
have taken place to identify a simpler more robust solution to be procured.
NUWAY system and maintenance, system installed, ongoing maintenance contract to 2030
5,353 44,718 0 12/10/2030

Page 11

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
064 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
Councillor IT Equipment 44,557 There is currently no budget for the provision and renewal of IT equipment for members. The earmarking identifies a
resource to utilise spend for that purpose to ensure that members have continued support in maintaining and replacing
vital IT equipment.
22,000 22,557 0 Ongoing
065 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
Digital Projects: Hybrid Council meetings 43,302 The funding will be used to maintain the ICT equipment used to support the provision of on-line and hybrid Council
meetings.  Will be used to fund Public-I licence over 3 years - for livestreaming Council meetings.
12,000 0 0 31/03/2027
066 Executive Director
(Douglas Hendry)
Legal and
Regulatory
Support
Debt Counselling & Welfare Rights 21,452 To meet the cost of a Debt Counselling and Welfare Rights Management System. 6,000 0 0 31/03/2027
067 Executive Director
(Douglas Hendry)
Non Departmental
/ Legal and
Regulatory
Services
Community Resilience Fund 71,999 Fund established in 2012/13 to be spent over more than one year. Fund reduced at the Council meeting on 11 February
2016.  Used to cover the costs of emergency phone lines and a contract with Aggreko for generators if required in an
Emergency Planning/Civil contingencies incident.  These costs amount to approximately £5k per year.
5,000 0 0 31/03/2037
068 Executive Director
(Kirsty Flanagan)
Across Services /
Customer Support
Services
Digital Projects (Increase in Schools
Bandwidth)
63,455 To complete one of a number of Digital Service Transformation projects with a commitment of £0.064m to increase
Schools Bandwidth. 
0 0 63,455 May be
required for 
Education
network
069 Executive Director
(Kirsty Flanagan)
Across Services /
Customer Support
Services
Digital Projects (Replacement Learning
Management System)
11,470 To deliver a number of Digital Service Transformation Projects with an original commitment of £0.030m towards a
replacement Learning Management System £0.030m.  This money will be used to pay for consultancy for an interface
between itrent and totara. Profiled for 24/25 based on decision to do a phased implementation of itrent.
11,470 0 0 31/03/2025
070 Executive Director
(Kirsty Flanagan)
Across Services /
Development and
Economic Growth
Information Management (Document
Management and Workflow for Planning,
Building Standards and Environmental
Health)
21,177 Hoping to implement the replacement for IDOX in March 2024 but there have been severe issues/delays with the new
programme
21,177 0 0 on hold
071 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Microsoft Licensing Costs 800,515 To meet  licensing and set-up costs for the Microsoft 365 rollout.  The spend is profiled and reported to MS365 board
each month. Currently projecting £50k 23/24, 189k 24/25, 193k 25/26 and 367k in 26/27 but all subject to change if
licence upgrades are required for Power BI or Teams Telephony.
189,000 611,515 0 31/03/2028
072 Executive Director
(Kirsty Flanagan)
Customer Support
Services
ICT computer replacement 531,000 At the Council Budget meeting on 23 February 2023, the Council committed to supporting the council's digital resilience
and overall efficiency with investment in ICT assets.  £88k will be drawn down in 24-25 for expenditure incurred in 23-
24, £323k drawn down in 25-26 for expenditure planned in 24-25 with the balance of £120k drawn down in 26-27.
88,000 443,000 0 31/03/2027
073 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) iTrent Project 320,555 Combination of parallel running of the new iTrent system alongside the legacy systems for up to 18 months whilst iTrent
is implemented and additional staffing resource to implement iTrent in late June 2024 and support staff for the first 3
months of operation through summer 2024. Total includes £73k from Financial services for funding additional staffing
resource to implement the payroll components of the iTrent HR and Payroll System by the end of June 2024 and support
staff for the first 3 months of operation during summer 2024.
320,555 0 0 31/03/2025
074 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Skills Development Scotland 150,936 We receive the money from Skills Development Scotland (SDS) to enable us to deliver Foundation and Modern
Apprenticeship programmes.  The money covers the salaries of the two Tutors we employ and also any materials we
require to deliver the programmes.  Update:  This is being spent on contract overlaps around the move from
Resourcelink, Crown, Iken to ITrent.  Spend reprofiled for 2024/25 following delays in itrent project.
100,936 50,000 0 30/06/2025
075 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Growing our Own and Modern Apprentices 109,150 Funding earmarked to support trainee development and modern apprenticeship opportunities based on priority
workforce risk areas.  A Trainee Regulatory Services post has been proposed by the manager who was unable to secure a
suitable candidate for the original advert. The spend would be spread over 24/25 and 25/26 once a suitable candidate is
in post
44,000 25,150 0 31/03/2026
076 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Security Operations Centre Subscription 71,188 There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost pressure being added to the
ICT revenue budget to cover the costs from 2026-27 onwards. 
0 71,188 0 31/03/2026
077 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) Resilient Website
Project
60,000 Cybersecurity action to move to a cloud based website platform that would improve resilience and enable service
continuity in the event of a cyber attack.  Procurement in progress for resilient website solution and Scotgov Cloud
Services Project providing input. Contract Award expected by end 2023. Procurement in progress for resilient website
solution.   Contract Award expected FQ1 2024-5 and full £60k spend in that year. Payment milestones in CARR will be
25% on Contract Award, 25% on Cloud Site Provisioning, 25% on Site migration and 25% on full go live cutover.
60,000 0 0 31/03/2025

Page 12

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
078 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) Digital Project
Officer
34,121 Employ a temporary Digital Project Officer as part of OD changes - additional member of staff required to action
changes, unable to recruit so existing staff increasing hours.
34,121 0 0 31/05/2025
079 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Implementation of Gaelic Language Plan 30,000 Agreed at Council Meeting February 2021.  Provision of funding for delivery and implementation of the council’s Gaelic
Language Plan in recognition of the contribution that Gaelic makes to economic growth and to the tourism sector, and
to enable delivery of key activities within the plan which currently receive no revenue funding.  In discussion with Bord
na Gaidhlig about a 3-year Gaelic Plan funding programme as opposed to individual grant applications for specific
projects. This earmarking would be used to provide match funding for that 3 year programme of projects.
10,000 20,000 0 31/03/2027
080 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Business Development Training 27,025 £27k budget from original Business Development Training earmarking remaining at 31/03/24.  This budget is funding
ongoing leadership development, coaching, action learning sets and commissioned training including Priority
Management.
10,000 17,025 0 Ongoing
081 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Bord na Gaidhlig 25,721 Grant funding from Bord na Gaidhlig. Ongoing spend ad hoc to deliver on commitments in the Gaelic Language Plan.
Grant income from GLAIF continues to be added to this total and then paid out to projects.
1,000 11,921 12,800 31/03/2028
082 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Learning and Development 19,436 In order to maximise the opportunities and efficiencies of digital learning, this funding will be used to support the
extension of digital learning in order to deliver the Digital Learning Strategy, which was approved in FQ4 20/21. This
money is to support the additional digital learning capacity required to build online elements of AB365 and other key
digital learning as we increase our digital learning offering linked to the digital skills survey and review of corporate
training. Delays in recruitment meant this has been reprofiled for spend in 24/25
10,000 9,436 0 30/09/2025
083 Executive Director
(Kirsty Flanagan)
Customer Support
Services
(2023 Digital Projects) Digital Engagement
Services Developer
15,677 To fund 50% of a new temporary LGE10 post.  The post is a Digital Engagement Services Developer that will be provide
capacity to deliver service efficiencies through the use of the  new CREATE/RPA software.  The other 50% of the post can
be funded from a current vacancy. 
15,677 0 0 31/03/2025
084 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Self Isolated Support / Self Isolated Support
Grant (HR)
15,500 The funds are being used for a number of Customer Service and Business efficiency related projects including a system
and consultancy of RPA (robotic process automation) and application development.  A full corporate website upgrade
and renewal using specialist web resources and the Digital Reception Project.  Specific commitments from the balance
are:   £3,600 PO issued for additional consultancy with Netcall on Oban Airport Payments project and £11,900 will be
spent on procurement of Digital Registration Platform with contract award due FQ1, 24-25.
15,500 0 0 31/03/2025
085 Executive Director
(Kirsty Flanagan)
Customer Support
Services
Establishing HR Service Centre 13,824 To facilitate the implementation of technical efficiency improvements and new processes.  This money will be used to
support phase two of the itrent project.  Spend reprofiled for 2024/25 following delays in itrent project.
13,824 0 0 31/03/2025
086 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Crown Estates (23-24) 838,000 2023-24 grant funding for Coastal Communities Fund (Crown Estates). 0 838,000 0 31/03/2026
087 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Crown Estates (22-23) 980,549 2022-23 grant funding for Coastal Communities Fund (Crown Estates).  Balance remaining at 23-24 year end £980,549. 
Projects ongoing with anticipated spend in 24-25 - Rockfield Centre (£60k), Campbeltown War Memorial (£17k) and
Bowmore Hall (£53k).  The remaining projects are underway with no confirmed spend - Jura Passenger Ferry (£100k),
Pier Feasibility Studies (£100k), Airport Resilience (£100k), Cemetery Maintenance (£300k), Kilmartin Car Park (£50k) and
Electric Charging Points (£200k - work ongoing with contractor on this project, spend anticipated for 24-25). 
430,549 550,000 0 31/03/2027
088 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Crown Estates (21-22) 856,939 2021/22 Crown Estate Funding (Coastal Communities Fund) of £1.635m.  Projects approved at 17 February 2022 P&R
Committee totalling £1.191M, further report required to allocate remaining £444k.  £778k has be drawn down.
The remaining projects are underway with no confirmed spend - Tarbert Public Realm (£196k - contract in place, spend
during 24-25), Kilmory Industrial Estate (£150k - no indication of when will be needed), Rothesay Kiddies Corner (£44k,
no indication of when will be drawn down at present), Jura Community Gigsbit Programme (£50k, no indication of when
will be spent), Dunoon Cycle Bothy (£145k, work ongoing to progress this project, hopefully will be spent 24-25), 
Dunoon STEM hub (£150k, work ongoing to progress this project, hopefully will be spent 24-25), Glenmorag Caravan
Site (£100k, works are starting with spend expected during 24-25), £22k contingency.
856,939 0 0 Ongoing
089 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Crown Estates (20-21) 418,803 2020/21 Crown Estate Funding (Coastal Communities Fund) with original balance of £1.504m. Expenditure/allocation to
projects delayed due to covid, now allocated as per report to P&R on 18 Feb 2021. £680k relates to works within the
current capital programme, moved to line Coastal Communities (Capital).   Remaining balance for Campbeltown
Community Action Plan (£50k), Helensburgh Clyde Street (£350k), Bute Community Land Bike Transfer Station (£10k)
Modular Hub Lochgilphead (£5k) and Tarbert Public Realm (£4k) to be spent in 24-25.
418,803 0 0 31/03/2025

Page 13

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
090 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
UK Shared Prosperity Fund (UKSPF) 853,731 2022-23 grant funding for UK Shared Prosperity Fund (UKSPF).  Funding can be spent up to end of March 2025 & 2023-
24 grant funding for UK Shared Prosperity Fund (UKSPF).
853,731 0 0 31/03/2025
091 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Scottish Government Islands Programme 646,045 2023-24 grant funding for Scottish Govt Islands Programme. 646,045 0 0 31/03/2025
092 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Place based investment programme 516,904 Projects approved at 12 August 2021 P&R Committee totalling £821k, Remaining funds committed and will be spent
during  24/25. Includes 2023-24 grant funding for Place Based Investment Programme.
516,904 0 0 31/03/2025
093 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Short Term Lets 232,604 These monies are to fund the STL licensing scheme until the renewal period of 27/28 as the majority for the licences will
have renewal dates of 2027. There will also be ongoing staffing costs, maintenance fees for ICT systems and ongoing
fees associated with short-term let licensing. Income from the scheme is intended to be directed to delivering the
licensing scheme
0 0 232,604 Ongoing
094 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Rothesay Pavilion (Revenue) 409,204 Build up a provision towards future Council commitment to provide up to £150,000 per annum running costs for
Rothesay Pavilion.
0 288,608 120,596 31/03/2029
095 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
LHEES (Local Heat & Energy Strategy) 75,000 This is used to finance the delivery of the Local Heat and Energy Strategy, involving resourcing a full time member of
staff and use of external consultants.  This is fulfilling a statutory requirement for the Council.  Production of the LHEES
will be instrumental in achieving funding for the decarbonisation of heat and energy use in Argyll and Bute’s Buildings.
50,000 25,000 0 31/03/2026
096 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Planning Income 60,000 To fund additional resources to support and develop the Council's planning service.  Whilst recruitment issues within
Argyll and Bute were largely been resolved during 2022/23, the requirement for the operation of the DM Service with
reduced staffing levels over an extended period of time, coupled with the increasing demand for development post-
Covid, and uncertainty caused by the introduction of National Planning Framework 4 has given rise to a substantial
backlog of case work and has had a significant adverse impact on processing times for planning applications.
Plans to utilise this on additional staff costs in 24-25 in order to reduce the backlog.
60,000 0 0 31/03/2025
097 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Islands Infrastructure Fund 55,611 2022-23 grant funding for Islands Infrastructure Fund. To be spent in 23-24 with some slippage in 24/25 55,611 0 0 31/03/2025
098 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Shelter Scotland Housing Funding 41,652 Contribution from Shelter Scotland to fund 50% of a 2 year temporary Empty Homes Officer.  Post holder now in place
with remainder of costs to be incurred and earmarking drawn down in 24/25.
41,652 0 0 31/03/2025
099 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Island Skills and Repopulation 8,953 2023-24 grant funding for Island Skills and Repopulation 8,953 0 0 31/03/2025
100 Executive Director
(Kirsty Flanagan)
Development &
Economic Growth
Scottish Govt Islands Programme 1,055 2022-23 grant funding for Scottish Govt Islands Programme.mostly spent in 23/24,remaining £1055 to be spent on
travel in 24/25
0 0 0 31/03/2025
101 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Coastal Communities (Capital) 339,219 2020/21 Crown Estate Funding (Coastal Communities Fund) totalling £1.504m. Expenditure/allocation to projects
delayed due to covid, now allocated as per report to P&R on 18 Feb 2021. Projects include Dunoon STEM Hub 100k,
Dunoon Cycle Bothy 249k,  Ardrishaig North Project 50k and Arrochar car park £90k.  
249,219 90,000 0 31/03/2027
102 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Staycation and Marketing Argyll and Bute 217,386 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m.   This will include
provision of additional waste disposal facilities and other facilities that will be informed by the Motorhome and Informal
Camping Survey.
As agreed at Council on 24 February 2022, Staycation investment £0.100m.  Augments the 2021/22 £0.5m staycation
initiative with an additional investment of £100k, including support for community groups and partners in the provision
of facilities which can support increasing staycation visitor numbers during the tourist periods. A further £155k
committed for 24-25 across Clipper Race (£30k), Road Signs (£50k) and Marketing (£75k). 
155,000 0 0 31/03/2025
103 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Oban TIF (Tax Incremental Financing) 214,158 Will be used to fund the TIF Programme office for a further 3 years as well as the programme office for Rural Growth
Deal beyond the funding that was agreed at Council for this in February 2021.
214,158 0 0 31/03/2025

Page 14

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
104 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Lochgilphead CARS 200,000 Conservation Area Regeneration Scheme for Lochgilphead  Grants awarded to upgrade conservation areas in
Lochgilphead such as shop fronts, town centre accommodation and other priority buildings. No drawdown required in
23/24 .These are multi year projects with spend generally increasing towards the end of the project life. Spend
committed for 2024-25 and beyond. Project runs until March 2026
100,000 100,000 0 31/03/2026
105 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Service Concessions - Priorities Investment
Fund (Project Officer for Housing
Emergency)
200,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of £200,000 from the Priorities
Investment Fund to fund a Project Officer to assist in accelerating the work of the Housing Emergency.
70,000 130,000 0 31/03/2026
106 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Helensburgh CARS 130,486 Conservation Area Regeneration Scheme for Helensburgh.  Grants awarded to upgrade conservation areas in
Helensburgh such as shop fronts, town centre accommodation and other priority buildings. 
65,243 65,243 0 31/03/2026
107 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Strategic Events & Festivals 41,260 At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for Events and Festivals for 22/23,
in order that the application process can commence during 21/22 and that this agreed figure be augmented by any
underspend remaining from the 20/21 financial year.  At 24 February 22, decision made to agree £90k for 23/24, in
order that the application process can commence during 22/23 and that this agreed figure be augmented by any
underspend remaining from the 21/22 financial year.  Applications have been received and payments will be made in 23-
24. Final balance (£41,260) to be spent in 24/25
41,260 0 0 31/03/2025
108 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Tackling Digital Exclusion Top-Up Fund 40,000 As agreed at the Council Meeting on 25 February 2021  to support communities and in some cases individuals that are
missing out on national programmes due to logistics and economies of scale.  
Earmarking was originally £217,600 but £177,600 has been released back to the general fund.  The  balance is
committed  for Mobile Mapping (£25k) with expenditure expected during 24-25 and the current Kerrera project (£15k)
in 25-26.
25,000 15,000 0 31/03/2026
109 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Economic Development - temp post to
support economic recovery
35,895 As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to support the
economic and social recovery together with the building back stronger themes.  To be used to fund Settlement Project
Support Officer during 23-24.  Post holder resigned Dec 23.  Discussions on going on whether to fill the post to Sept 24.
35,895 0 0 31/03/2025
110 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Digital Boost 33,840 To provide funding for Digital Boost program.  Initially was to be used to help fund the programme in 21/22 but
additional income was received by the service. Spend planned as 6k on digital surgeries and £9k on digital events and
workshops. The remaining £18, 840 will be used to fund c25 digital reviews ,  All funds will be committed by end of
24/25 but as suppliers are paid for work only after it has been completed, some of the costs may not actually be
defrayed until Q1 25-26. 
33,840 0 0 31/06/2025
111 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Gypsy Traveller Grant/LACER Funding
(Gypsy Travellers)
32,826 Local Authority COVID Economic Recovery Fund grant.  This funding would pay for MECOPP (Minority Ethnic Carers of
People Project) to engage with the Gypsy Travellers community on the important subject of the cost of living increases,
fuel poverty and the impact of factors such as their remote rural locations and the facilities available to them for
everyday living  have on their livelihoods. This was originally LACER and additional funding routed through SG for Gypsy
Traveller sites received on behalf of ACHA (the sites have been transferred to ACHA). This therefore isn't all a Council
budget. The ACHA element of funding was for site improvements - hence the planned roadway improvements
32,826 0 0 31/03/2025
112 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Screen Machine 28,000 At the Council Budget meeting on 22 February 2024, the Council committed to a one-off investment of £0.028m to
Screen Machine in response to an external funding request.
28,000 0 0 31/03/2025
113 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Kilmartin Museum 19,999 Upgrade of Kilmartin Museum, works carried out by Museum with grants awarded upon completion milestones.  Budget
allocated to capital originally but was moved out of capital and into earmarked reserves at 2020/21 budget meeting. 
£20k retention due to be paid out in 23/24, however ongoing legal negotiations between Kilmartin & the contractors
may mean we are not able to pay this retention payment in 23/24
19,999 0 0 31/03/2025
114 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
Proposed Local Development Plan 2 19,910 During 19/20, a cost pressure of £68,000 was allocated to deal with the costs associated with the production of Local
Development Plan 2.  The work carried out has taken longer than planned and a draft report has only been received in
Mid-march 24.  It will take some time to review and agree a finalised report and as a result funds identified for this work
will need to be carried forward into 24/25 but will be drawn down very early in the year.
19,910 0 0 31/03/2025

Page 15

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
115 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (Sector Support Grant) 18,910 Local Authority COVID Economic Recovery Fund grant.  This will provide funding, either part of the small  business
development grant or standalone, to help micros and small business to implement projects that contribute to the sector
as well as benefitting the business, for example: Tourism and hospitality, food and drink or retail.  With option to
provide additional business support to hard hit areas including Bute and Kintyre where unemployment remains higher
than average - support via specialist advice, locally tailored grants to meet local priorities and targeted marketing
activity. to be split £115,000 for Shop fronts and £35,000  Business support via Business Gateway. As at 31/03/2024
Shop fronts have £7760 remaining and Bus support £11,150. The Bus support element along with ER refs 122 & 124
(totalling 36130) are to be spent on Digital Reviews as agreed at P&R committee on 09.05.2024. We expect to commit all
the spend in this FY 24-25, but as suppliers are paid for work only after it has been completed, some of the costs may
not actually be defrayed until Q1 25-26
18,910 0 0 30/06/2025
116 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
EH Covid Posts 17,697 Funding initially for 2 posts for 2 years.  Posts were initially recruited to with one leaving and the other going on
maternity leave resulting in delays in expenditure.  One employee is now back from maternity leave and earmarked
reserve have drawn down to cover their costs in 23-24 (20,078)
These monies are being used to fund additional costs related to the review and assessment of site investigation reports
and support the Senior Clerical post which is currently advertised. It could support consultants given that there are 8
vacancies across the team
17,697 0 0 31/03/2026
117 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (Shop Local) 14,670 Local Authority COVID Economic Recovery Fund grant.  This funding would provide funding to continue the Shop Local
scheme into 2023/24 and 2024/25, buying additional cards and allow the cards to gather momentum and support local
businesses.
14,670 0 0 31/03/2025
118 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (Small Business
Development Grant)
12,651 Local Authority COVID Economic Recovery Fund grant.  This funding will provide funding of between £500 and £5,000 to
help existing micro and small businesses to improve their resilience or growth via projects to implement green
initiatives, implement digital development, implement marketing improvements and improve efficiency/innovation. 
This along with ER 115 & 122  (totalling 36130) are to be spent on Digital Reviews as agreed at P&R committee on
09.05.2024 We expect to commit all the spend in this FY 24-25, but as suppliers are paid for work only after it has been
completed, some of the costs may not actually be defrayed until Q1 25-26
12,651 0 0 30/06/2025
119 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
LACER Funding (New Enterprise Support
Grant)
12,329 Local Authority COVID Economic Recovery Fund grant.  This funding would provide £3,000 grants to help new
businesses start up and establish. 
This along with ER 115 & 124  (totalling 36130) are to be spent on Digital Reviews as agreed at P&R committee on
09.05.2024 We expect to commit all the spend in this FY 24-25, but as suppliers are paid for work only after it has been
completed, some of the costs may not actually be defrayed until Q1 25-26
12,329 0 0 30/06/2025
120 Executive Director
(Kirsty Flanagan)
Development and
Economic Growth
International Eight Metre Association
World Cup
10,000 At the Council Budget meeting on 22 February 2024, the Council committed to a one-off investment of £0.010m to the
International Eight Metre World Cup in response to an external funding request.
10,000 0 0 31/03/2025
121 Executive Director
(Kirsty Flanagan)
Financial Services Benefit Admin Grant 170,879 Grant monies which would have to be repaid if not utilised for intended purpose.  Benefit Administration activities in the
build up to the migration of Housing Benefit to Universal Credit.  These monies are committed to cover ongoing Benefit
Administration activities in 22/23, 23/24 and 24/25 when it is now expected that the full migration of working age
Housing Benefit caseload to Universal Credit will be complete.  Monies will be used to implement the recommended
changes from the recent Revs and Bens BPR including ongoing improvements to the Council's debt recovery policies
(£50,000), build resilience including staff overtime, outsourcing of Housing Benefit processing during the transition and
cover casual staff for the Universal Credit migration (£20,500). Monies also set aside for additional works to the value of
£40,000 with the software suppliers around enhancing the Revs and Bens system, automating processes and
transitioning customers to use digital gateways to contact the service.
170,879 0 0 31/03/2025
122 Executive Director
(Kirsty Flanagan)
Financial Services Housing Benefits Private 142,094 Specific funding allocation for Housing Benefit including DHP. Funds will be used to continue to support vulnerable
people initially financially affected by the COVID-19 outbreak but now facing the cost of living crisis to sustain their
tenancies.  This earmarking will help offset potential overspends in the DHP/ Scottish Welfare Fund budget going
forward.
142,094 0 0 31/03/2025

Page 16

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
123 Executive Director
(Kirsty Flanagan)
Financial Services Flexible Food Fund 90,481 Financial Insecurity funding from Scottish Government routed into the Argyll and Bute Flexible Food and Fuel Fund
(ABFFFF) is aimed at tackling financial insecurity for adults and families across Argyll and Bute.  Working in partnership
with the Community Food Forum, Bute Advice Centre and ALIenergy, households with low incomes and no access to
cash savings can apply for immediate financial support.  The Fund helps support daily living expenses.   Since inception
in January 2021 until March 2023 client gain in extra benefits income for families was £3.8 million with 2,500 families
had been supported. The project has been extended to 31 March 2025 with funding coming from the UK Shared
Prosperity Fund and this earmarking to support it. The Council's Financial Inclusion and Advice Group have proposed
that monies from the Flexible Funding for Supporting People at tier 4 COVID earmarking should be used to support this
project to ensure it can continue to the contract end date of 31 March 2025. The Scottish Government have provided
this funding and have endorsed this award winning project promoting it as part of the solution to end the need for
foodbanks nationally.
90,481 0 0 31/03/2025
124 Executive Director
(Kirsty Flanagan)
Financial Services Revenue and Benefits BPR  - extra staff to
implement savings targets
86,955 On 23 February 2023, the Council agreed to the implementation of savings option FIS2324-002 in relation to the
Revenue and Benefits - Income Generation and Business Process Review.   This included an extra 4 FTE of staff.  Delays
in recruitment have caused slippage in the allocated budget for these posts. 
86,955 0 0 31/03/2025
125 Executive Director
(Kirsty Flanagan)
Financial Services Cost of Living Payments - Admin funding 72,550 Administration funding associated with Scottish Government schemes to issue monies to Low income Households for
the Cost of Living Payments. To provide additional staffing to help with the backlog and to support the administration of
the double charges on second homes in 2024/2025. We continue to receive a large number of enquiries from this
customer profile particularly given upcoming changes being made by the Assessor at DABVJB
72,550 0 0 31/03/2025
126 Executive Director
(Kirsty Flanagan)
Financial Services Flexible Funding for Supporting People
while at Tier 4 COVID
58,981 Funding from SG to strengthen local authority responses to meet emerging needs and support people in their
communities struggling with the restrictions and guidance at all protection levels re COVID, particularly those at risk
through health and social inequalities. This support could cover the same types of support.  In June 2021 the Council
agreed to support 20 projects led by a range of Council officers, officers from the HSCP and members of the third sector
to deliver wide ranging support across our region.  A report will be presented to members in due course.
58,981 0 0 31/03/2025
127 Executive Director
(Kirsty Flanagan)
Financial Services Scotland Loves Local 57,453 As agreed by Council 22 February 24, a £57,453 underspend from the Scotland Loves Local scheme to be allocated to
support measures to help with the costs of living by funding member organisations of the Community Food Forum, ALI
Energy, Argyll and Bute Citizens Advice Bureau and Bute Advice Centre, with detailed proposals to be agreed by the
Executive Director with responsibility for Finance, in consultation with the Leader, Depute Leader and Leader of the
Largest Opposition Group. Details of the agreed spend are to be reported to elected members.
57,453 0 0 31/03/2025
128 Executive Director
(Kirsty Flanagan)
Financial Services Pandemic Support Payments (CTR - Admin) 51,968 Administration funding associated with Scottish Government schemes to issue monies to CTR recipients. Provide
additional staffing to support the recovery from backlog of Council Tax administration caused by Pandemic Support
Payment process, further administration duties related to LACER fund and also to support any further Scottish
Government funding initiatives that occur during 24/25
51,968 0 0 31/03/2025
129 Executive Director
(Kirsty Flanagan)
Financial Services Financial Systems 33,748 The council is required to implement the IFRS16 Leases accounting standard  from the 1st April 2024. 33,748 0 0 31/03/2025
130 Executive Director
(Kirsty Flanagan)
Financial Services Accounting and Budgeting Team Resilience 47,883 Training and examination fees for 6 staff who are currently undertaking their professional CIPFA/ACCA training.  In
addition funding the further training of 1 of our auditors and providing finance business partner training to a group of
our existing professional staff.
8,000 8,000 31,883 31/03/2031
131 Executive Director
(Kirsty Flanagan)
Financial Services FIS - BEIS Energy Grants 27,590 Grant monies which would have to be repaid if not utilised for intended purpose, Additional staff to cover pressures of
administering double charge of council tax in 2nd homes £28k
27,590 31/03/2025
132 Executive Director
(Kirsty Flanagan)
Financial Services Self Isolated Support Grant 5,316 Unspent admin funding for processing Self isolation Support Grants. 5,316 0 0 31/03/2025
133 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Service Concessions - Biodegradable
Municipal Waste (BMW) Ban
3,500,000 As agreed at Council meeting 23 February 2023 - Ensuring Argyll and Bute is able to better address the challenges faced
by a remote/rural/ island region in complying with the forthcoming national BMW ban. 
0 3,500,000 0 31/03/2027
134 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Waste Variation Monies 1,241,752 Waste Variation Monies - £1.242m balance at 31/03/24: This will be used to fund/part-fund various waste infrastructure
projects that will support the council’s compliance with the 2026 ban on the Landfill of Biodegradable Municipal Waste.
£570K in 2024-25 consisting of :- Island restoration/capping, Helensburgh transfer station and recycling improve. fund
(island sites) design costs, technology trial on blue bin recycling participation, consultancy costs relating to additional
monitoring data for SEPA and waste PPP site conversion.
£672K in 2025-26  consisting of:- Island restoration/capping, Helensburgh transfer station design costs during
construction, consultancy costs relating to additional monitoring data for SEPA and waste PPP site conversion.
569,752 672,000 0 31/03/2027

Page 17

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
135 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Roads Reconstruction programme 1,165,000 At the Council Budget meeting on 23 February 2023, the Council committed to augmenting overall allocation for the
roads repair and maintenance programme with additional funds to bring up to £8m total investment for 2023/24 and
2024/25.  This will be drawn down to the capital plan during 24-25 and 25-26.
285,000 880,000 0 31/03/2026
136 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Footpath improvements 750,000 At the Council Budget meeting on 23 February 2023, the Council committed to providing additional funding for footpath
improvements across Argyll and Bute. Spend forecast for 23/24, draw down in 24/25.
750,000 0 0 31/03/2025
137 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Vehicle Replacement 483,661 Timing delay in fleet replacement causing one-off saving.   Vehicles purchased and received in 22/23 for £174k, draw
down to capital will be processed in 23/24.  remainder has been spent in 23-24 and will be drawn down in 24-25.
483,661 0 0 31/03/2025
138 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Service Concessions - Priorities Investment
Fund (Strategic Development Framework)
450,000 As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of £450,000 to procure consultancy
support to assist in driving forward the Strategic Development Frameworks.
225,000 225,000 0 31/03/2026
139 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Active Travel 370,000 At the Council Budget meeting on 24 February 2022, the Council committed to additional investments.  For Active Travel
£0.500m for further improvements for footpaths and pavements and supporting safer routes to schools across Argyll
and Bute. Some capital expenditure to be incurred in 22-23 and drawn down in 23-24, remainder planned to be spent in
23-24 and drawn down in 24-25.
370,000 0 0 31/03/2025
140 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Street Lighting 300,000 At the Council Budget meeting on 24 February 2022, the Council committed to additional investments. For Street
Lighting, £0.300m to deliver a programme of street lighting column replacement and improvement across Argyll and
Bute, prioritised based on condition, with funding for at least 260 lighting columns.  Expenditure planned for 23-24,
draw down in 24-25 (capital expenditure).
300,000 0 0 31/03/2025
141 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
3G pitches / Tarbert Sports Pitches 287,835 In November 2018, the Council agreed to a maintenance funding package to be progressed for a number of 3G pitches
including Tarbert. This funding will provide an estimated 6.5 years’ worth of ongoing maintenance up to 2025-26. There
is the potential to extend the continued upkeep of the pitches until 2026-27 given the earmarking available will not be
fully utilised by the end of 2025-26.  However, there will be potential redundancy costs for 2 employees that will need to
be covered from the remaining balance. Paper on proposed extension to be prepared.
83,883 203,952 0 31/03/2026
142 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Green Transport Initiatives 140,000 At the Council meeting on 27 February 2020, it was agreed to input £400k in Green transport, investment in footway
and cycle path maintenance supporting the healthy wellbeing and green agenda.  Spend has been delayed due to COVID
and this will be taken forward in 23/24. £260k Footways Reconstruction programme now spent and will be drawn down
against capital programme during 23/24. £140k Ardrishaig North Project spent in 22/23 and drawn down in 24/25
(capital expenditure).
140,000 0 0 31/03/2025
143 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Hermitage Park 56,383 The Hermitage Park regeneration project has a significant investment from the Heritage Lottery Fund (HLF) which has a
requirement to have a 10 year Management and Maintenance Plan.  This will be partly funded by existing Council
revenue budgets but should also be supplemented by any additional income which can be generated from park
activities.  Part of the HLF conditions are that all income generated by the park should be retained to support the
Management and Maintenance Plan and a result of this requirement, any unspent income generated by the park is
retained for future years requirements. There is currently an ongoing issue with the licensee of the cafe around the
recovery of service fees/insurances.   There is also outstanding water charges currently being disputed.  Depending on
the outcome of these issues will determine the funding that can be drawn down for park maintenance to ensure the
green flag status is retained.
10,000 20,796 25,587 31/03/2032
144 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Parking Grant 50,013 Grant from Scottish Transport for the assessment of footway parking required under the Transport (Scotland) Act 2019. 
Assessment criteria from the Scottish Gov which will take approx. 12 months to complete throughout 23/24 with work
then to follow in 24/25.
50,013 0 0 31/03/2026
145 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Mercury Abatement - Crematorium 42,819 Phase 1 and 2 of Cardross Crematorium work completed. Phase 3 of the Cardross Crematorium works commenced April
2024. These works will ensure DDA compliance.
42,819 0 0 31/03/2025
146 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Climate Change 40,942 At the Council meeting on 27 February 2020, it was agreed to input £500k budget to mitigate the impacts of weather
related damage and climate change with specific emphasis on gully cleaning and drainage improvements.  Spend has
been delayed due to COVID and the intention is to spend the funds on 2 Gully Motors plus staff over next 2 years.
Vehicles have been received and budget will be drawn down to cover their cost. The remaining budget will be used
towards running the vehicles.
40,942 0 0 31/03/2025
147 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Amenity Services introduction of
management information system
28,099 Delay with introduction of amenity time recording system due to increased costs.  Discussions ongoing to find
alternative cheaper solution.  The software/system being introduced by HR/Payroll during 2023-24 offers a time-
recording facility.  Although not included in the current HR/Payroll spec, once the new system is up and running, the
proposal would be to investigate the time-recording system to see if viable for amenity time recording purposes.
0 0 0 31/03/2025

Page 18

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
148 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Bin Replacement Programme 1,455 At the Council Budget meeting on 24 February 2022, the Council committed to additional investments - £0.100m in
Argyll and Bute’s litter bin replacement programme and infrastructure, providing almost 200 new/better bins across the
area where required due to condition/need and with a focus on town centres and prominent locations, to support
cleaner communities.  Requests that officers explore options for use of new and innovative litter disposal solutions for
future consideration. 
0 0 0 31/03/2025
149 Executive Director
(Kirsty Flanagan)
Roads &
Infrastructure
Services
(2023 Contract Inflation Adjustments)
Waste PPP
223,261 Contract Inflation adjustments - £0.223m balance at 31/03/24.  Adjustment to inflation included in the budget based on
updated RPIX figures at February 2023.  Based on actuals in 23-24, only £32k of this was required leaving a balance of
£223k.
223,261 0 0 31/03/2025
150 Executive Director
(Kirsty Flanagan)
Roads and
Infrastructure
Services
Piers and Harbours Investment Fund 4,125,031 Funding generated through increased harbour fees and charges in order to generate funds to meet the costs of the
prudential borrowing required to develop and maintain the Council's harbour assets and infrastructure. Under the
Harbours Act 1964, section 42, as a statutory harbour undertaker, the Council must prepare an annual statement of
accounts relating to the harbour activities and any associated activities for each harbour for which it is the statutory
harbour authority. This requirement cannot be satisfied by the preparation of a statement of accounts which relates to
other Council activities in addition to harbour activities.  In essence, any surplus in the Piers and Harbours budget must
be reinvested in the marine asset and reflected in accounts.  Reserve will not be needed until circa 2026-27 when
borrowing costs will exceed the additional income received in revenue and reserve will then be used to pay borrowing
costs.
0 2,789,311 1,335,720 Ongoing
151 Executive Director
(Kirsty Flanagan)
Roads and
Infrastructure
Services
Weather Incident costs not covered by
Bellwin claim.
198,000 £839k was set aside at budget meeting in February 2024 as part of the unallocated general fund balance workings to
cover the weather incident costs not covered by the Bellwin Claim.  As £641k was utilised during 23-24, the balance of
£0.198m is being earmarked for costs expected in 24-25.
198,000 0 0 31/03/2025
152 Non Departmental Non Departmental Strategic Housing Fund 8,765,258 Accumulation of Council tax collected from the second homes discount on properties is earmarked as part of the
Strategic Housing Fund balance.   Plans in place to utilise £11.472m over the next 5 years to provide affordable housing
as part of the Strategic Housing Improvement Plan which will utilise this reserve as well as future income expected from
Council Tax on second homes.
2,300,000 3,890,191 2,575,067 Ongoing
153 Non Departmental Non Departmental Service Concessions - Learning Estate
Investment Strategy
8,000,000 As agreed at Council meeting 23 February 2023 - Signalling council’s commitment to working in partnership to secure
new schools for Argyll and Bute, through substantial investment to support future-proofing of Argyll and Bute’s schools
estate.
0 8,000,000 0 tbc
154 Non Departmental Non Departmental Service Concessions - Replace previous
loans fund principal repayment holiday
5,400,000 As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit will be used to replace exercising the
principal repayment holiday that was previously agreed by Council.
5,400,000 0 0
155 Non Departmental Non Departmental Service Concessions - Rothesay Pavilion 4,772,000 As agreed at Council meeting 23 February 2023 - Building on previous commitments to securing a future for this building
of international, national and local significance with additional contribution to the overall funding target which requires
collective action; helping project to progress towards success with funding that supports completion of certain work
stages and securing wind/watertight status.
0 4,772,000 0 31/03/2026
156 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund
4,742,000 As agreed at Council meeting 23 February 2023 - Safeguarding future investment in Priorities for Argyll and Bute by
making long-term use of service concession gain to establish dedicated fund to lever in, secure and support key strategic
investments in this year and future years.
0 4,742,000 0 Ongoing
157 Non Departmental Non Departmental Service Concessions - Roads Investment to
Capital
3,546,000 As agreed at Council meeting 23 February 2023 - Augmenting overall allocation for roads repair and maintenance
programme with additional funds to bring up to £8m total investment for 2024/25.
0 3,546,000 0 31/03/2027
158 Non Departmental Non Departmental Investment in Affordable Housing 3,024,000 Agreed at Council Meeting 11 February 2016.  This balance reduces as the Loans to RSL balances are reducing. 0 3,024,000 0 31/12/2039
159 Non Departmental Non Departmental Redundancy Costs 2,963,407 One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures as agreed at budget
setting meeting in February 2020. Future redundancies provision. Given the budget gap over the next 5 years and 61%
of our costs being staff costs, redundancy costs are likely to increase and there is a need to provide for possibillity of
covering those costs.
150,000 2,813,407 0 Ongoing
160 Non Departmental Non Departmental Further Capital pressures per budget pack
February 22
2,648,000 As agreed at Council on 24 February 2022, a provision for Capital contract increases £3.900m.
£1.133m draw down in 24-25 for Campbeltown Flood plus a further £0.468 for other capital increases.
£0.322m draw down in 25-26 for ICT and £0.279 in 26-27.
£0.446m is unallocated
1,601,000 1,047,000 0 Ongoing
161 Non Departmental Non Departmental Capital Budget 2,212,000 At the Council Budget meeting on 22 February 2024, the Council committed to allocating released earmarkings
amounting to £2.212m towards the Capital budget.
0 2,212,000 31/03/2027
162 Non Departmental Non Departmental Capital Budget (Previously Asset
Management Fund)
2,070,058 At the Council meeting on 22 February 24, it was agreed that the balance in this reserve be allocated to the Capital
budget.  Exact profile not known for the capital projects this will be funding but likely draw down will be 25-26.
0 2,070,058 0 31/03/2027
163 Non Departmental Non Departmental Service Concessions - Capital Projects
Inflation Pressures
2,000,000 As agreed at Council meeting 23 February 2023 -Boosting resilience of Capital Programme and providing added support
as required for key capital/infrastructure projects - £2m.
Further allocation agreed Council meeting 22 February 24 - increase capital contract earmarking to protect current
capital projects in plan £0.297m
0 2,000,000 0 31/03/2027

Page 19

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
164 Non Departmental Non Departmental Pay Inflation Contingency 1,700,000 Negotiations for the 2024/25 pay award are ongoing but initial discussions suggest it will be beyond the 3% increase
currently built into the budget outlook. £1.7m equates to approximately a 1% pay rise therefore providing a contingency
at this level is prudent
1,700,000 0 0 31/03/2025
165 Non Departmental Non Departmental Significant Strategic Change Projects 1,468,000 Funding agreed as part of the Loans Fund Review for Significant Strategic Change Projects £2.157m which will be
earmarked from the 2023-24 outturn but some drawdowns have already occurred during 2023-24.  £689k of
expenditure incurred and will be drawn down in 23-24, remainder planned for 24-25.
1,468,000 0 0 31/03/2025
166 Non Departmental Non Departmental Campbeltown Flood Prevention 1,406,000 Funding agreed as part of the Loans Fund Review for Campbeltown Flood Prevention.  75,000 1,331,000 0 31/03/2026
167 Non Departmental Non Departmental Rothesay Pavilion (Recovery and Renewal
Fund)
1,360,000 As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is provision for future recovery,
regeneration and renewal, as well as any future pressures which may arise following the Covid-19 pandemic through a
dedicated Recovery and Renewal Fund.  Commitments have been made against this fund as follows: Levelling up bid
costs £0.150m, Scotland Loves Local overspend £0.037m and Rothesay Pavillion £1.360m.
0 1,360,000 0 31/03/2026
168 Non Departmental Non Departmental Regeneration and Economic sustainability
in Lochgilphead and Tarbert.
1,049,579 Agreed at Council Meeting 11 February 2016.  £761k will be drawn down in 24-25 to fund prior years expenditure for
Lochgilphead Front Green and Ardrishaig North.  £289k unallocated.
760,579 289,000 0 31/03/2027
169 Non Departmental Non Departmental Service Concessions - Priorities Investment
Fund (Capital Programme)
1,028,000 As agreed by Council on 22 February 2024- transfer of £1,028,000 from the Priorities Investment Fund to the Capital
plan
1,028,000 0 31/03/2027
170 Non Departmental Non Departmental Underwriting development of Rothesay
Pavilion
1,000,000 Funding to meet additional costs identified as necessary for the refurbishment of Rothesay Pavilion (£1m). 1,000,000 0 0 31/03/2025
171 Non Departmental Non Departmental Oban TIF (Tax Incremental Financing -
Excess NDR)
875,651 This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure projects.  This fund will be used in
the future as TIF projects are delivered.   Discussions in place on future ff the next TIF project (Oban Airport) which will
utilise this reserve.  If the project does not go ahead, we will need to return NDR to Scottish Government
0 875,651 0 Ongoing
172 Non Departmental Non Departmental Oban TIF 787,620 Will be used to fund the TIF Programme office for a further 3 years as well as the programme office for Rural Growth
Deal beyond the funding that was agreed at Council for this in February 2021.
787,620 Ongoing
173 Non Departmental Non Departmental Service Concessions - New refuse collection
vehicles
700,000 As agreed at Council meeting 23 February 2023 - Enhancing waste and recycling uplift arrangements through placing
orders for new refuse vehicles.
700,000 0 0 31/03/2025
174 Non Departmental Non Departmental Connect for Success Fund (previously
Supporting Organisational Change) -
amended February 24 per ELT)
681,299 One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures as agreed at budget
setting meeting in February 2020 - Provision to support organisational change (£0.500m)
It is proposed to supplement the existing 'Supporting Organisational Change' reserve first established in February 2020
with a further £1.2m to enable the Council to deliver longer term, more fundamental, service redesign which will require
funding to support the identification and delivery of  solutions that take account of future requirements and community
engagement and deliver longer term revenue and benefits to the Council
406,000 275,299 0 Ongoing
175 Non Departmental Non Departmental Service Concessions - Climate Change 640,000 As agreed at Council meeting 23 February 2023 - Continuing our track record of investing in climate change with funding
to further enhance school estate climate change measures, with allocations for primary and secondary schools across
the area in Campbeltown, Dunoon, Helensburgh, Lochgilphead, Oban and Rothesay.
0 640,000 0 31/03/2025
176 Non Departmental Non Departmental Inward investment Fund 540,897 Agreed at Council Meeting 11 February 2016.   Original balance of funding was £833k for Rural Growth Deal - P&R
Committee have already approved spend of £600k leaving a balance of £233k uncommitted. The approved spend
consists of consultancy, project development and design and the remaining £233k will be used for the same purpose to
complete design work and get endorsed full business cases to allow RGD projects to commence.
267,740 273,157 0 31/03/2030
177 Non Departmental Non Departmental Funding Gap in Capital Programme 488,000 Funding agreed as part of the Loans Fund Review for the Funding Gap in Capital Programme £2.619m which will be
earmarked from the 2023-24 outturn but some drawdowns have already occurred during 2023-24.  Planned to fund
capital programme and drawn down in 24-25.
488,000 0 0 31/03/2025
178 Non Departmental Non Departmental COVID Funding 418,337 Net balance on COVID cost centres at year end 2022/23 with proposals on use to be developed. 0 0 0 31/03/2025
179 Non Departmental Non Departmental Capital Inflation cost pressures 297,000 Further allocation agreed Council meeting 22 February 24 - increase capital contract earmarking to protect current
capital projects in plan £0.297m
297,000 31/03/2027
180 Non Departmental Non Departmental Treasury Gain 294,000 To fund one off operational saving 202425 003 as agreed by Council when setting 2024/25 budget in February 2024. 294,000 0 0 31/03/2025
181 Non Departmental Non Departmental Capital pressure 257,000 Pressure identified on the 20/21 COSLA COVID costs spreadsheets - requires to be earmarked to be drawn down when
required against the Capital Plan.  To be incurred during 23-24 and drawn down in 24-25.
257,000 0 0 31/03/2025
182 Non Departmental Non Departmental Service Concessions - New Jet Patcher
Vehicle
250,000 As agreed at Council meeting 23 February 2023 - Complementing multi-million pound capital investment in roads repair
and maintenance with new jet patcher order to support delivery of programme.
250,000 0 0 31/03/2025

Page 20

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
183 Non Departmental Non Departmental Service Concessions - New Road Marking
Vehicle
230,000 As agreed at Council meeting 23 February 2023 - Completing suite of investments in new fleet procurement, to support
delivery of roads repair and maintenance programme, with order for additional road marking vehicle.
0 230,000 0 31/03/2026
184 Non Departmental Non Departmental Information Management (Balance of
Funding)
200,469 To support a number of initiatives in respect of improving the Council's information management in line with the
transformation agenda and increasing the pace of change as outlined in the BV Review.  This was the balance of funding
to explore information management solutions in a strategic and coherent way £209k.  Committed for MS 365 project - D
Logan/I Jackson. Paper went to DMT in Dec.
200,469 0 0 31/03/2028
185 Non Departmental Non Departmental Levelling up bid costs (Recovery and
Renewal Fund)
150,000 As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is provision for future recovery,
regeneration and renewal, as well as any future pressures which may arise following the Covid-19 pandemic through a
dedicated Recovery and Renewal Fund.  Commitments have been made against this fund as follows: Levelling up bid
costs £0.150m, Scotland Loves Local overspend £0.037m and Rothesay Pavilion £1.360m.
0 150,000 0 31/03/2026
186 Non Departmental Non Departmental Engagement with Hub North re provision of
services for older adults and vulnerable
people across Argyll and Bute
100,000 At the Council budget meeting February 23, an allocation of £0.1m from the Unallocated General Fund balance for the
Health and Social Care Partnership to engage, in partnership with the Council, with Hub North to develop a strategic
business case in relation to the provision of services for older adults and other vulnerable people across Argyll and Bute. 
It is intended that this will be spent on an on-going business case and options appraisal work with Hub and that a sizable
proportion will be spent during 24/25
70,000 30,000 0 31/03/2026
187 Non Departmental Non Departmental Spend to Save Route Optimisation Software 82,775 One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures as agreed at budget
setting meeting in February 2020 -  Spend to save route optimisation (£0.100m) which will be spent over  2023/24 and
2024/25.
82,775 0 0 31/03/2025
188 Non Departmental Non Departmental CHARTS 80,000 At the Council Budget meeting on 22 February 2024, the Council committed to £0.075m one-off investment in CHARTS
in response to an external funding request will be spent in 24-25. There remains £0.005m from a COVID earmarking for
CHARTS as well.
80,000 0 0 31/03/2025
189 Non Departmental Non Departmental Levelling up Fund bids per P&R February 22 70,000 £15k to be drawn down in 2024-25 for post that is currently in place. £55k to be utilised in 2024-25 for Student Summer
post, contaminated land consultants, ICT development, increased costs for current staff on a temp arrangement and to
part fund 2 year temporary Regulatory Service Officer post.
Not all spend has been agreed yet and business cases are pending.
70,000 0 0 31/03/2026
190 Non Departmental Non Departmental Scotland Loves Local Overspend (Recovery
and Renewal Fund)
37,000 As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m.  This is provision for future recovery,
regeneration and renewal, as well as any future pressures which may arise following the Covid-19 pandemic through a
dedicated Recovery and Renewal Fund.  Commitments have been made against this fund as follows: Levelling up bid
costs £0.150m, Scotland Loves Local overspend £0.037m and Rothesay Pavilion £1.360m.
0 37,000 0 31/03/2026
191 Non Departmental Other Operating
Income and
Expenditure
Educational Support to Ukrainian Children
and Young People
348,856 Balance of grant received in 2022-23 for provision of childcare and education support to Ukrainian children and young
people. Spending plan includes teaching and support staff within schools.
286,983 61,873 0 11/08/2025
192 Social Work Adult Services See Hear Funding 13,658 Funding has been received specifically from the Scottish Government to support activity around implementation of the
See Hear recommendations and the identified priorities of individual Sensory Partnerships. No plans for spend in current
financial year, funds will be used in the next two years in accordance with the See Hear plan and Argyll and Bute's BSL
Local plan.
6,829 6,829 0 31/03/2026
193 Social Work Children and
Families
Criminal Justice Transformation Funding 39,890 Additional funding from SG to fund redesign work within Criminal Justice. Funds to be pooled with equivalent additional
funding received by our CJ Partnership Partners to fund a transformation and development project across the three
partner areas.  The money will be spent in 24/25 to meet outcomes of the four year plan - near completion, including
consultations and supporting people to access services
39,890 0 0 31/03/2025
194a Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£2m to balance 24-25 budget)
2,000,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets resulting from the drop in employers
pension rate.  The total of £6.875m is split as follows: £2m to balance the budget, £3.75m allocation to capital plan, per
budget meeting 22 February 24 and the balance of £1.125m going towards what will be total of £2m over the two years
pot to be directed to transformation and projects that will save revenue in the future.
2,000,000 31/03/2025
194b Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£3.75m allocation to capital plan)
3,750,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets resulting from the drop in employers
pension rate.  The total of £6.875m is split as follows: £2m to balance the budget, £3.75m allocation to capital plan, per
budget meeting 22 February 24 and the balance of £1.125m going towards what will be total of £2m over the two years
pot to be directed to transformation and projects that will save revenue in the future.
0 3,750,000 31/03/2028
194c Non Departmental Non Departmental Council Strathclyde Pension Fund Saving 24-
25 (£2m to be directed to transformation
and projects that will save revenue in the
future)
1,125,000 This is part of the revenue budget for 24-25 and is the saving on pension budgets resulting from the drop in employers
pension rate.  The total of £6.875m is split as follows: £2m to balance the budget, £3.75m allocation to capital plan, per
budget meeting 22 February 24 and the balance of £1.125m going towards what will be total of £2m over the two years
pot to be directed to transformation and projects that will save revenue in the future.
1,125,000 Ongoing

Page 21

Ref Department Service Description Remaining
Balance
Plans for Use Amount
Planned to
be Spent in
2024-25
Amount
Planned to
be Spent in
2025-26
Amount
Planned to be
Spent from
2026/27
onwards
Expiry Date
195 Non Departmental /
Social Work
Non Departmental Social Work Strathclyde Pension Fund
Saving 24-25
3,053,000 This is part of the revenue budget for 24-25 and is the saving on Social Work pension budgets resulting from the drop in
employers pension rate - to be held in Council reserves for utilisation by the HSCP in future. 
3,053,000 Ongoing
196 Non Departmental Non Departmental Capital Plan 1,875,000 At the budget meeting on 22 February 2024, Council agreed to transfer £1.875m from the revenue budget over to the
capital plan.
1,875,000 31/03/2028
119,245,508 40,345,557 60,103,882 17,238,408

Page 22

APPENDIX 2 - EARMARKED RESERVES THAT COULD BE RELEASED TO THE GENERAL FUND
Ref Department Service Description Opening
Balance
2024-25
Original Plans for Use Value that
could be
released to
General Fund
EXPLANATION
022 Executive Director (Douglas
Hendry)
Education Expansion of Universal Free
School Meals
1,228,663 To support the continued phased implementation of Universal Free School Meals (UFSM) for Primary children. 832,678 P4/5 UFSM has been fully rolled out already therefore this can be released to the
General Fund. Note that if the uptake was to increase there could be an impact of
equipment replacement which may need to be funded in the future. This assumes that
if P6/P7 was rolled out that it would be fully funded by the Scottish Government.
039 Executive Director (Douglas
Hendry)
Education Scottish Government Initiatives:
Developing the Young
Workforce
GIRFEC
Languages 1+2
37,478 Developing the Young Workforce: Developing an Argyll and Bute foundational apprenticeship scheme, developing
support for vulnerable young people to access training, developing key group knowledge of the local labour market in
relation to post-school opportunities and delivering a prevocational programme for unemployed young people.  Grant
received from the Scottish Government for this purpose.  GIRFEC: This grant funding is for the specific purpose of
supporting Argyll and Bute’s contribution to implementing GIRFEC and the Children and Young Person (Scotland) Act
to ensure compliance with legislation.  Activity in Argyll and Bute will include developing specific resources, staff
training and development, protocols and procedures in line with the GIRFEC practice model and national guidelines. 
Languages 1+2: Grant provided for implementing  the Scottish Government's 1+2 languages policy for Primary schools. 
The Scottish Government have confirmed that any unspent funding can be put into reserves for spend later. 
37,478 There is no planned spend in relation to this and agreement has been received from the
Scottish Government that anything unspent can go back to Reserves.
043 Executive Director (Douglas
Hendry)
Education (2023 Digital Projects) Cashless
Catering
30,000 To support the ongoing implementation of the new cashless catering system during the testing and roll out phase. 20,000 Only £10k of this £30k earmarking is still required for reports currently being built,
therefore £20k can be released back to the General Fund.
052 Executive Director (Douglas
Hendry)
Education Education Learning Estate
Condition Surveys
1,815 To fund the delivery of School Core Facts (SCF) compliant Condition Surveys for prioritised School Buildings. 1,815 This is a small amount that can be covered by the Service therefore it can be released
back to the General Fund.
055 Executive Director (Douglas
Hendry)
Education Transport for 'Smoke Free Me'
Drama Production
605 NHS funding contribution towards the cost of school transport for pupils attending the Smoke Free Me drama
production which was delivered across Argyll and Bute.
605 This is a small amount that can be covered by the Service therefore it can be released
back to the General Fund.
075 Executive Director (Kirsty
Flanagan)
Customer
Support
Services
Growing our Own and Modern
Apprentices
109,150 Funding earmarked to support trainee development and modern apprenticeship opportunities based on priority
workforce risk areas. These areas have been identified and proposals developed. £95,790 to be spent in 23/24 and
£13,360 to be spent in 24/25 to fund a graduate trainee and 3 apprentices to deliver trainee development and modern
apprenticeship opportunities.  Update:  An amended advert for a Trainee Regulatory Services post has been proposed
by the manager who was unable to secure a suitable candidate for the original advert. The spend would be spread
over 24/25 and 25/26 once a suitable candidate is in post
40,000 The balance of this earmarking is £109k but only £69k is actually now required for its
intended purpose, leaving £40k that could be returned to the General Fund.
100 Executive Director (Kirsty
Flanagan)
Development
& Economic
Growth
Scottish Govt Islands Programme 1,055 2022-23 grant funding for Scottish Govt Islands Programme. To be spent in 23-24 1,055 This is a small amount that can be covered by the Service therefore it can be released
back to the General Fund.
102 Executive Director (Kirsty
Flanagan)
Development
and Economic
Growth
Staycation and Marketing Argyll
and Bute
217,386 As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m.   This will include
provision of additional waste disposal facilities and other facilities that will be informed by the Motorhome and
Informal Camping Survey.
As agreed at Council on 24 February 2022, Staycation investment £0.100m.  Augments the 2021/22 £0.5m staycation
initiative with an additional investment of £100k, including support for community groups and partners in the
provision of facilities which can support increasing staycation visitor numbers during the 2022/23 and 2023/24
seasons. 40K now comitted to the Clipper race visit to Oban to be spent in 24/25
62,386 The balance of this earmarking is £217k but only £155k is actually now required for its
intended purpose, leaving £62k that could be returned to the General Fund.
147 Executive Director (Kirsty
Flanagan)
Roads &
Infrastructure
Amenity Services introduction of
management information
system
28,099 Delay with introduction of amenity time recording system due to increased costs.  Discussions ongoing to find
alternative cheaper solution.  The software/system being introduced by HR/Payroll during 2023-24 offers a time-
recording facility.  Although not included in the current HR/Payroll spec, once the new system is up and running, the
proposal would be to investigate the time-recording system to see if viable for amenity time recording purposes.
28,099 At this moment in time there is no plan to take this forward and this will be re-assessed
following the introduction of the new HR/Payroll system.  Funding not required at this
stage therefore can be released to the General Fund.
148 Executive Director (Kirsty
Flanagan)
Roads &
Infrastructure
Bin Replacement Programme 1,455 At the Council Budget meeting on 24 February 2022, the Council committed to additional investments - £0.100m in
Argyll and Bute’s litter bin replacement programme and infrastructure, providing almost 200 new/better bins across
the area where required due to condition/need and with a focus on town centres and prominent locations, to support
cleaner communities.  Requests that officers explore options for use of new and innovative litter disposal solutions for
future consideration.  The bulk of the spend was incurred during 2022-23 with the remaining balance to be spent in
2024-25.
1,455 All spend was incurred at the end of 2023-24 for bin purchases, reamining balance can
be released to the general fund.
178 Non Departmental Non
Departmental
COVID Funding 418,337 Net balance on COVID cost centres at year end 2022/23 with proposals on use to be developed. 418,337 No planned spend for this funding that was received during the pandemic therefore can
be released to the General Fund.
1,443,908

Page 23

APPENDIX 3 - EARMARKED RESERVES THAT COULD BE RELEASED TO THE GENERAL FUND WITH ASSOCIATED COST PRESSURE
Ref Department Service Description Opening
Balance 2024-
25
Original Plans for Use Value that
could be
released to
General
Fund
EXPLANATION Recurring Cost
Pressure to be
built into
Budget Outlook
065 Executive Director
(Douglas Hendry)
Legal and Regulatory
Support
Digital Projects: Hybrid
Council meetings
43,302 The funding will be used to maintain the ICT
equipment used to support the provision of on-
line and hybrid Council meetings.
31,302 £12k required in 2024-25 then a recurring cost of £12k every
year that could be built in as a cost pressure to the budget
outlook and release £31k to General Fund.
12,000
066 Executive Director
(Douglas Hendry)
Legal and Regulatory
Support
Debt Counselling & Welfare
Rights
21,452 To meet the cost of a Debt Counselling and
Welfare Rights Management System.
15,452 £6k required in 2024-25 then a recurring cost of £6k every
year that could be built in as a cost pressure to the budget
outlook and release £15k to General Fund.
6,000
067 Non Departmental Non Departmental / Legal
and Regulatory Support
Community Resilience Fund 71,999 Fund established in 2012/13 to be spent over
more than one year. Fund reduced at the Council
meeting on 11 February 2016
66,999 £5k required in 2024-25 then a recurring cost of £5k every
year that could be built in as a cost pressure to the budget
outlook and release £67k to General Fund.
5,000
113,753 23,000

Page 24

APPENDIX 4 - AMENDMENTS TO THE PRESENTATION OF EXISTING EARMARKED RESERVES
Reference Description Proposed Action
003 Community Planning
006 Communities & Partnership Team
010 Rothesay Pavilion Charity
094 Rothesay Pavilion (Revenue)
012 Rothesay Pavilion Essential Repairs
155 Rothesay Pavilion (Service Concessions)
167 Rothesay Pavilion (Recovery & Renewal Fund)
170 Underwriting development of Rothesay Pavilion
008 Information Management (Estates Survey Work)
018 Site Investigation Works
042 Gaelic Specific Grant
044 Languages 1+2
074 Skills Development Scotland
085 Establishing HR Service Centre
080 Business Development Training
082 Learning and Development
086 Crown Estates (23-24)
087 Crown Estates (22-23)
088 Crown Estates (21-22)
089 Crown Estates (20-21)
116 EH COVID Posts
Change of use proposed as we were unable to recruit to the posts at that time. To be used
to fund additional costs related to the review and assessment of site investigation reports
and provide support to consultants.
134 Waste Variation Monies
149 Waste PPP (2023 Contract Inflation Adjustments)
030 Additional Teaching/Support in Schools/Digital
Devices/Family Home Learning Support Fund
033 School WIFI Upgrades
034 Education Transformation Fund
049 Skype for Business for Education/Digital Projects
Combine two Earmarked Reserves with similar objectives into one with detail remaining in
narrative.
Combine two Earmarked Reserves with similar objectives into one with detail remaining in
narrative. Both are Revenue expenditure in nature.
Combine four Earmarked Reserves with similar objectives into one with detail remaining in
narrative. All four are Capital expenditure in nature.
Combine two Earmarked Reserves with similar objectives into one with detail remaining in
narrative.
Combine two Earmarked Reserves with similar objectives into one with detail remaining in
narrative.
Combine two Earmarked Reserves with similar objectives into one with detail remaining in
narrative.
Combine two Earmarked Reserves with similar objectives into one with detail remaining in
narrative.
Combine four Earmarked Reserves with similar objectives into one with detail remaining in
narrative.
Combine two Earmarked Reserves with similar objectives into one with detail remaining in
narrative.
Combine four Earmarked Reserves with similar objectives into one with detail remaining in
narrative. All relate to the Education Network Programme as approved at P&R Committee
on 15 August.