Democracy Spraffa

DOCUMENT PACK (Tendering Committee 21 09 22) Bookmarked

West Dunbartonshire Council · 21 September 2022
Back to Tendering Committee — 21 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda
Tendering Committee
Date:  Wednesday, 21 September 2022
___________________________________________________________________
Time:  09:15 
___________________________________________________________________
Venue: Clyde Room, Clydebank Town Hall, 5 Hall Street, Clydebank
___________________________________________________________________
Contact:   Scott Kelly, Committee Officer
Tel: 01389 737220.  Email: scott.kelly@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Tendering Committee as detailed above.
The business is shown on the attached agenda.  
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:
Councillor John Millar (Chair)
Councillor Diane Docherty 
Councillor Craig Edward
Councillor David McBride
Councillor Jonathan McColl
Councillor James McElhill
Councillor June McKay (Vice Chair)
Councillor Hazel Sorrell
All other Councillors for information
Chief Officer – Supply, Distribution and Property
Chief Officer – Regulatory and Regeneration
Date of Issue: 8 September 2022
Page 2

Page 3

TENDERING COMMITTEE
WEDNESDAY, 21 SEPTEMBER 2022
AGENDA
1 APOLOGIES
2 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations.
3 MINUTES OF PREVIOUS MEETING 5 – 6
Submit, for approval as a correct record, the Minutes of Meeting of the
Tendering Committee held on 3 August 2022.
4 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
5 CONTRACT AUTHORISATION REPORT – LAUNDRY 7 – 13
EQUIPMENT AND MAINTENANCE WORKS, AND PROVISION
OF ELECTRICAL SPECIALIST INCLUDING ENTRY SYSTEMS
AND ALARMS 
6
Submit report by the Chief Officer – Supply, Distribution and Property seeking
approval to authorise the Manager of Legal Services to conclude the award
of the contracts for Laundry Equipment and Maintenance Works, and
provision of Electrical Specialist Including Entry Systems and Alarms.
PROVISION OF INSURANCE SERVICES (INCLUDING CLAIMS 15 – 21
HANDLING) FOR WEST DUNBARTONSHIRE COUNCIL AND
WEST DUNBARTONSHIRE LEISURE TRUST
Submit report by the Chief Officer – Supply, Distribution and Property advising
of the Provision of Insurance Services (including Claims Handling) contracts
for West Dunbartonshire Council and the West Dunbartonshire Leisure Trust
which were approved on 25 July 2022 by the Chief Officer – Resources and
the Chief Officer – Regulatory and Regeneration, in consultation with the
Convener of Tendering Committee.
Page 3

Page 4

7 CONTRACT AUTHORISATION REPORT – SUPPLY AND FIT 23 – 25
OF AV EQUIPMENT AT DENNY CIVIC THEATRE,
DUMBARTON 
Submit report by the Chief Officer – Supply, Distribution and Property seeking
approval to authorise the Manager of Legal Services to conclude the award of
the contract for the Supply and Fit of AV Equipment at Denny Civic Theatre,
Dumbarton. 
8 CONTRACT AUTHORISATION REPORT – DEMOLITION OF 27 – 30
THE FORMER CARE HOME AT 2 ASHTREE COURT, OLD
KILPATRICK 
Submit report by the Chief Officer – Supply, Distribution and Property seeking
approval to authorise the Manager of Legal Services to conclude the award of
the contract for the Demolition of the Former Care Home at 2 Ashtree Court,
Old Kilpatrick. 
9 CONTRACT AUTHORISATION REPORT – CYCLE TO WORK 31 – 34
SCHEME 
Submit report by the Chief Officer – Supply, Distribution and Property seeking
approval to authorise the Manager – Legal Services to conclude the award of
the contract for the Provision of a Cycle to Work Scheme.
Page 4

Page 5

TENDERING COMMITTEE
At a Meeting of the Tendering Committee held in the Clyde Room, Clydebank Town
Hall, Clydebank on Wednesday, 3 August 2022 at 9.17 a.m.
Present: Councillors Craig Edward, David McBride, Jonathan McColl,
James McElhill, June McKay and Hazel Sorrell.
Attending: Angela Wilson, Chief Officer – Supply, Distribution and Property;
Angus Cameron, Business Partner – Strategic Procurement;
Alistair Norris, Capital Projects Manager; Brian Miller, Section
Head, ICT Infrastructure; and Scott Kelly, Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Councillors
Diane Docherty and John Millar.
Councillor June McKay in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Tendering Committee held on 8 June 2022 were
submitted and approved as a correct record.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
CONTRACT AUTHORISATION REPORT – MEASURED TERM CONTRACT FOR
LIFT EQUIPMENT
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval to authorise the Manager of Legal Services, Regulatory and
Regeneration, to conclude the award of the Measured Term Contract for Lift
Equipment.
ITEM 3
Page 5

Page 6

After discussion and having heard the Business Partner – Strategic Procurement,
the Capital Projects Manager and the Chief Officer – Supply, Distribution and
Property in further explanation of the report and in answer to Members’ questions,
the Committee agreed:-
(1) to authorise the Manager of Legal Services, Regulatory and Regeneration, to
conclude, on behalf of the Council, the award of the Measured Term Contract
for Lift Equipment to Kone PLC;
(2) to note that the contract shall be for a period of two years and at a value of
£207,349.68 ex VAT (£248,819.62 including VAT) with the option of two
one-year extensions with the four year budget being £650,000 ex VAT; and
(3) to note that the estimated commencement date of the contract was 1
February 2023.
CONTRACT AUTHORISATION REPORT – PROVISION OF SERVER
MAINTENANCE RENEWAL
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval to authorise the Manager of Legal Services, Regulatory and
Regeneration, to conclude the award of the contract for the Provision of Server
Maintenance Renewal.
Having heard the Business Partner – Strategic Procurement and the Section Head,
ICT Infrastructure, in further explanation of the report and in answer to Members’
questions, the Committee agreed:-
(1) to authorise the Manager of Legal Services, Regulatory and Regeneration, to
conclude, on behalf of the Council, the award of the contract for Server
Maintenance Renewal to Park Place Technologies Limited; and
(2) to note that the contract shall be for a maximum period of 12 months and at a
value of £59,942.76 ex VAT (£71,931.31 including VAT), and that the
estimated commencement date of the contract was 4 September 2022.
The meeting closed at 9.30 a.m.
Page 6

Page 7

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution and Property
Tendering Committee: 21 September 2022
___________________________________________________________________
Subject: Contract Authorisation Report – Laundry Equipment and
Maintenance Works and Provision of Electrical Specialist
Including Entry Systems and Alarms
1. Purpose
1.1 The purpose of this report is to seek the approval of the Tendering Committee
to authorise the Manager of Legal Services to conclude the award of the
contracts for:
• Laundry Equipment and Maintenance Works; and
• Electrical Specialist Including Entry Systems and Alarms
2. Recommendations
2.1 It is recommended that the Tendering Committee authorise the Manager of
Legal Services to conclude on behalf of the Council, the award of:
a) The contract for Laundry Equipment Maintenance Works to Washco Ltd.
The contract shall be for a period of two years at a budget of £97,500 ex
VAT with the option to extend the period by another two x one year with
the four year budget being £195,000 ex VAT.  The estimated
commencement date of the contract is 30 September 2022.
b) The contract for Electrical Specialist to Alger Electrics and Alarms Limited,
Dumbarton. The contract shall be for a period of two years at a budget of
£900,000 ex VAT with the option to extend the period by another two x
one year with the four year budget being £1,800,000 ex VAT.  The
estimated commencement date of the contract is 30 September 2022.
3. Background
3.1 Building Services provides a quality 24 / 7 / 365 service to Council owned
operational and non-operational properties and is responsible for repairs to
common elements in mixed tenure blocks and local Registered Social
Landlords.  Building Services will continue to carry out as much of the repairs
and maintenance work as possible using in-house resources. Where this is not
possible sub-contractors and specialist contractors are utilised as appropriate.
3.2 The period of the budget is for four years. The budget was set and approved by
Council at its meetings on March 2021 and March 2022.
ITEM 5
Page 7

Page 8

3.3 These procurement exercises have been conducted in accordance with the
Council’s Standing Orders and Financial Regulations and the Public
Procurement Regulations.  A Contract Strategy document was also approved
on 25 February 2022.
4. Main Issues
4.1 The Corporate Procurement Unit (CPU) published a Prior Information Notice
containing a market research questionnaire looking to understand the supply
base to inform the Council’s lotting structure, with a particular focus to engage
with as many local small and medium-sized enterprises (SME) as possible. 
The CPU advertised the market research questionnaire on the Council’s Social
Media pages, informed the local Chamber of Commerce to highlight the
opportunities locally; provided information about the Supplier Development
Programme (SDP), which helps businesses that have little or no experience of
tendering and are often too small to have dedicated bid / tender resources to
contemplate bidding for public sector contracts.
4.2 An initial contract notice was published on the Public Contracts Scotland
advertising portal on the 25 March 2022 with a Tender closing date of 20 April
2022. Feedback from the market indicated that due to time constraints no bids
were submitted within the tender time period. Consequently after discussions
with the Service Area it was agreed to re-publish the tender and inform
interested bidders of the opportunity.
4.3 The Laundry Equipment Maintenance Works contract notice was published on
the Public Contracts Scotland advertising portal on 7 July 2022. Five potential
bidders expressed an interest for this, with two bidders submitting a response
by the deadline on 8 August 2022.
4.4 The Electrical Specialist contract notice was published on the Public Contracts
Scotland advertising portal on 6 July 2022. 19 potential bidders expressed an
interest for this, with one bidder submitting a response by the deadline on 5
August 2022.
4.5 The tender submissions were evaluated by representatives from Building
Services and CPU against pre-determined selection criteria forming part of the
published tender documents which assessed competence, experience, and
capacity. There was two tender submissions for Laundry Equipment
Maintenance Works and there was one submission for Electrical Specialists
which passed the selection criteria.
4.6 The Laundry Equipment Maintenance Works tender submissions were
evaluated against a set of award criteria that was based on a Quality/Price ratio
of 40% / 60%. 
The scores relative to the award criteria of each tenderer are as
follows:
Page 8

Page 9

Weighting Washco Ltd Thain Commercial
Ltd
Quality (40%)
Quality 18% 12.25% 12.875%
Specification 10% 6.75% 7.25%
Cost 5% 3.75% 1.875%
Business Continuity 3% 1.5% 1.875%
Social benefits 2% 2% 2%
Sustainability 1% 1% 0.875%
Fairwork First 1% 0.5% 0.75%
Quality Sub-Total %: (40%) 27.75% 27.5%
Price (60%)
Price - £112,753 £143,330
Price Sub-Total %: (60%) 60% 47.20%
Total Score 100% 87.75% 74.7%
Page 9

Page 10

4.7 The Electrical Specialist tender submissions were evaluated against a set of
award criteria that was based on a Quality/Price ratio of 40% / 60%. 
The
scores relative to the award criteria of each tenderer are as follows:
4.8 It is recommended that the contract is awarded to Washco Ltd, of Glasgow who
has provided the most economically advantageous tender. The contract shall
be for a period of two years at a budget of £97,500 ex VAT with the option to
extend the period by another two x one year with the four year budget being
£195,000 ex VAT.  The estimated commencement date of the contract is 30
September 2022.
4.9 It is recommended that the contract is awarded to Alger Electrics and Alarms
Limited, of Dumbarton. The contract shall be for a period of two years at a
budget of £900,000 ex VAT with the option to extend the period by another two
x one year with the four year budget being £1,800,000 ex VAT.  The estimated
commencement date of the contract is 30 September 2022.
Weighting Alger Electrics and Alarms Limited
Quality (30%)
Quality 18% 16.25%
Specification 10% 9%
Cost 5% 3.75%
Business Continuity 3% 2.25%
Social benefits 2 % 1.86%
Sustainability 1% 0.81%
Fairwork First 1% 0.94%
Quality Sub-Total %: (40%) 34.86%
Price (70%)
Price Sub-Total %: (60%) 60%
Total Score 100% 94.86%
Page 10

Page 11

4.10 Both Washco Ltd and Alger Electrics and Alarms Limited has committed to
paying all staff as a minimum the real Living Wage (£9.90 per hour) and
promotes Fair Working Practices across their organisation.  
4.11 Appendix 1 details the additional social benefits that the contractors have
committed to deliver as part of these contracts.  The social benefits will be
discussed at the implementation meetings with the contractors and actions to
take these forward will be agreed.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Financial costs will be met from the approved Housing Revenue and Capital
accounts / Central Revenue and Capital accounts.
6.2 These procurement exercises were conducted in accordance with the agreed
Contract Strategy produced by the CPU in close consultation with Building
Services and Corporate Asset Services and the provisions of Contract Standing
Orders, the Financial Regulations and Public Procurement Regulations.
7. Risk Analysis
7.1 These Contractors have no known links to Serious and Organised Crime which
would have significant political and reputational ramifications for the Council.
7.2 Should the Tendering Committee decide not to proceed as recommended then
this will delay the project, may have financial implications and reputational
ramifications.
8. Equalities Impact Assessment (EIA)
8.1 An equalities impact screening was undertaken and identified that an Equalities
Impact Assessment was required.
9. Environmental Sustainability
9.1  Public bodies have a duty under the Climate Change (Scotland) Act 2009 to
carry out all of their functions in a way that is best calculated to deliver on
Scotland's carbon reduction targets and Climate Change Adaptation plans
9.2 The specifications include mandated social, environmental and economic
wellbeing considerations including materials, waste and equality.
10. Consultation
10.1 Building Services, Corporate Asset Services, Finance Services and Legal
Services have been consulted on the contents of this report
11. Strategic Assessment
Page 11

Page 12

11.1 The Provision of Laundry Equipment & Maintenance Works and Electrical
Specialist Including Entry Systems and Alarms will contribute to the delivery of
the Council’s strategic priorities:
• A Strong local economy and improved employment opportunities;
• Open, accountable and accessible local government; and
• Efficient and effective frontline services that improve the everyday lives of
residents.
Name:  Angela Wilson
Designation:  Chief Officer – Supply, Distribution and Property
Date: 5 September 2022
Person to Contact: Ellie Street
Procurement Officer
Ellie.street@west-dumbarton.gov.uk
Daniel O’Donnell
Procurement Officer
Daniel.O'Donnell@west-dunbarton.gov.uk
Alistair Norris
Capital Projects Manager
Alistair.Norris@west-dumbarton.gov.uk
Appendices: Additional Social Benefits
Background Papers: Contract Strategy
EIA Screening
Wards Affected: All Council Wards
Page 12

Page 13

Appendix 1:  Additional Social Benefits
Additional Social Benefits Laundry
Equipment
Maintenance
Works
Electrical
Specialist
Recruit member of staff from within the West Dunbartonshire geographical area - 2
Use of West Dunbartonshire based organisations for sub-contracting opportunities 2 -
Offer a new registered apprenticeship to a resident of the West Dunbartonshire geographical area - 3
Deliver quarterly workshops, covering career skills, mock interviews etc., within a school or community learning
environment
2 -
Facilitate quarterly work experience opportunities covering a range of work based skills 1 -
Any other measurable and committed support for local small and medium sized enterprises as part of this contract 1 -
Any other measurable and committed support for local Third Sector organisation(s) as part of this contract 1 -
Any other measurable and committed support for local Supported Businesses as part of this contract 1 -
Any other measurable and committed support for local community benefits as part of this contract 1 -
Donation of goods to local food-share scheme 6 -
Donation of money to a community group or charity that supports health and wellbeing within the community 1 -
Donations of materials to support a local community project 2 -
Donation of labour to support a local community project 1 -
Provision of volunteers to support a local community project 1 -
Donation of money to support a local community project 1 -
Any measurable and committed support for fair and ethically traded Goods / Services / Works as part of this contract 1 -
Any measurable and committed support to the equality agenda as part of this contract 1 -
Any measurable and committed support to the fair work practices for workers (including any agency or sub-contractor
workers) engaged in the delivery of this contract
1 -
Supporting environmental regeneration, such as re-development of old quarry or brown belt areas 1 -
Supporting environmental educational projects in schools such as tree or woodland planting or educational packs 1 -
Supporting the reduction of non-recyclable materials throughout the West Dunbartonshire area 1 -
Uplifting the same amount of plastic from the Council as you have delivered and recycle the plastic in a sustainable
way
1 -
Page 13

Page 14

Page 14

Page 15

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution and Property
Tendering Committee: 21 September 2022
___________________________________________________________________
Subject: Provision of Insurance Services (including Claims
Handling) for West Dunbartonshire Council and West
Dunbartonshire Leisure Trust
1. Purpose
1.1 The purpose of this report is to advise Members of the Provision of Insurance
Services (including Claims Handling) contracts that were approved on the 25
July 2022 by the Chief Officer – Resources and the Chief Officer - Regulatory
and Regeneration in consultation with the Convener of Tendering Committee
for the Provision of Insurance Services (including Claims Handling) for the
Council and the Leisure Trust and the awarding of contracts as detailed.
2. Recommendations
2.1 It is recommended that Members note the appointment of insurance providers
as listed in Appendix 1 for the Provision of Insurance Services (including
Claims Handling) for the Council and West Dunbartonshire Leisure Trust
(WDLT). 
2.2 Members are to further note that award of these contracts shall be for a period
of three years and at a value of £3,549,281 ex VAT with the option of two 12
month extensions and at a value £5,915,468.74 ex VAT over five years based
on year one premiums inclusive of insurance premium tax. The
commencement date of the contracts is 1 August 2022.
3. Background
3.1 The Council and the Leisure Trust require a number of insurance policies to
ensure sound business practice as well as meeting any statutory requirements
where necessary.
3.2 The procurement exercise for the insurance requirements was conducted in
accordance with the Public Procurement Regulations, the Council’s Standing
Orders and Financial Regulations. A Contract Strategy document was also
approved on 10 March 2022.
3.3 A report on Contracts to be Awarded During the Summer Recess was
approved at the Tendering Committee on 8 June. A further report detailing the
outcome of the contracts for Provision of Insurance Services (including Claims
Handling) for the Council and the Leisure Trust was to be submitted to the next
appropriate Tendering Committee for noting, in accordance with Standing
Orders 35(b) iv.
ITEM 6
Page 15

Page 16

4. Main Issues
4.1 Two procurement routes were considered, an open tender or a mini
competition utilising a Crown Commercial Services collaborative dynamic
purchasing system. Due to the time constraints the only viable option was to
procure through a mini competition.
4.2 A mini competition invite was issued to the 22 insurance providers on the
dynamic purchasing system on 4 May 2022. Six potential bidders expressed an
interest, with three bidders submitting a response by the deadline of 2 June
2022. 
4.3 The three tender submissions were evaluated by representatives from the
Insurance Team, the Leisure Trust, Arthur J Gallagher Insurance Brokers and
the Corporate Procurement Unit against a set of award criteria which is based
on Commercial / Quality ratio of 60% / 40% for each of the 13 Insurance Lots
4.4 The scores relative to the award criteria of each tenderer and the Award of the
contracts are detailed within Appendix 1.
4.5 Both Maven Public Sector and Risk Management Partners have committed to
paying all staff as a minimum the real Living Wage (£9.90 per hour) and
promotes Fair Working Practices across their respective organisations. Both
organisations indicated the difficulty in offering social benefits although Maven
Public Sector has committed to the delivery of the following social benefits
under contract Lot 6:
• Measurable and committed support for local community benefits as part of
the contract.
The social benefits will be discussed at the implementation meeting with Maven
Public Sector and actions to take these forward will be agreed. 
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Financial costs in respect of these contracts will be met from the approved
budget of Resources.
6.2 A comparison with last year insurances premiums indicates an overall saving to
the Council of 20% and 18% for the Leisure Trust.
6.3 This procurement exercise was conducted in accordance with the agreed
Contract Strategy produced by the Corporate Procurement Unit in close
consultation with the Insurance Team, the Leisure Trust, and Arthur J
Gallagher Insurance Brokers officers and the provisions of Contract Standing
Orders, the Financial Regulations and Public Procurement Regulations.
Page 16

Page 17

7. Risk Analysis
7.1 Maven Public Sector and Risk Management Partners Ltd have no known links
to Serious and Organised Crime which would have significant political and
reputational ramifications for the Council and the Leisure Trust.
8. Equalities Impact Assessment (EIA)
8.1 An equalities screening was undertaken for this report to determine if there is
an equalities impact. The results where there is no equalities impact
9. Consultation
9.1 The Insurance Team, the Leisure Trust, Finance Services and Legal Services
along with the Council’s insurance broker have been consulted on the contents
of this report
10. Strategic Assessment
12.1 The Provision of Insurance Services (including Claims Handling) for the Council
and the Leisure Trust will contribute to the delivery of the Council's strategic
priorities.
Name:  Angela Wilson
Designation:  Chief Officer – Supply, Distribution and Property
Date: 27 July 2022
Person to Contact: Alex Grace, Senior Procurement Officer, Corporate
Procurement Unit
Telephone 01389 737828
Email: alex.grace@west-dunbarton.gov.uk
.
Appendices: Appendix 1.
Background Papers: Contract Strategy
EIA Screening
Delegated Authority Report - Tendering Committee: 8
June 2022
Wards Affected: All Council Wards
Page 17

Page 18

Appendix 1
Weighting Maven
Public
Sector
Risk
Managem
ent
Partners
Ltd
Protector
Insurance
Commentary
Technical (40%)
Service Delivery and
Methodology
24% 18.30% 24.00% 15.60% The technical scores were carried
over to each Lot, and added to the
commercial scores to provide a
total score for each Lot.  
Implementation Plan and
Contract Transfer
8% 5.90% 7.70% 4.50%
Contract Management and
Performance
6% 4.20% 4.80% 1.80%
Social Benefits in
Procurement
0% 0.00% 0.00% 0.00%
Commitment to Fair
Working Practices
1.0% 0.75% 0.75% 0.75%
Sustainability 1.0% 0.50% 0.75% 0.25%
Technical  Sub-Total %: 40% 29.65% 38.00% 22.90%
Lot 1
Property Damage &
Business Interruption,
including Money and
Special All Risks Property
Insured
60% £ £ £ Not awarded - Lot 12 Package was
the best option for the Council 
Price Sub Total £ - £409,910 £663,856 -
Price Sub Total % 60% 60.00% 37.05% -
Total Score 100% 89.65% 75.05% -
Page 18

Page 19

Lot 2
Casualty, including
Employer’s Liability, Public
& Products Liability,
Officials’ Indemnity, Libel &
Slander
60% £ £ £ Not awarded - Lot 12 Package was
the best option for the Council
Price Sub Total £ - £199,890 £226,237 £369,952
Price Sub Total % 60% 60.00% 53.01% 35.59%
Total Score 100% 89.65% 91.01% 58.49%
Lot 3
Lot 3  Motor Fleet 60% £ £ £ Not awarded - Lot 12 Package was
the best option for the Council  Price Sub Total £ - £330,444 £286,688 £336,405
Price Sub Total % 60% 52.05% 60.00% 54.11%
Total Score 100% 81.70% 98.00% 77.01%
Lot 4
Contractor’s All Risks/Own
Plant/Hired-in-Plant
60% £ £ £ Contract award to Mavin Public
Sector 
Price Sub Total £ - £10,000 £33,930 -
Price Sub Total % 60% 60.00% 17.68% -
Total Score 100% 89.65% 55.68% -
Lot 5
Computer 60% £ £ £ Contract award to Risk
Management Partners Ltd Price Sub Total £ - £10,000 £11,145 -
Price  Sub Total % 60% 60.00% 53.83% -
Total Score 100% 89.65% 91.83% -
Page 19

Page 20

Lot 6
Fidelity Guarantee 60% £ £ £ Contract award to Mavin Public
Sector.  Noted:  Risk Management
Partners Ltd offer was conditional
with award of Lot 2 or Lot 3
Price Sub Total £ - £16,587 £17,141 -
Price Sub Total % 60% 60.00% 58.06% -
Total Score 100% 89.65% 96.06% -
Lot 7
Group Personal
Accident/Travel –
Corporate and Off Site
Visits
60% £ £ £ Contract award to Risk
Management Partners Ltd
Price Sub Total £ - - £11,436 -
Price Sub Total % 60% - 60.00% -
Total Score 100% - 98.00% -
Lot 8
Engineering Inspection
and Insurance
60% £ £ £ Contract award to Risk
Management Partners Ltd
Price Sub Total £ - - £50,578 -
Price Sub Total % 60% - 60.00% -
Total Score 100% - 98.00% -
Lot 9
Fine Art including
Exhibitions
60% £ £ £ No contract award
Price Sub Total £ - - - -
Price Sub Total % 60% - - -
Total Score 100% - - -
Page 20

Page 21

Lot 10
Medical Malpractice 60% £ £ £ Not awarded - Lot 12 Package
which includes lot 2 was the best
option for the Council which has
adequate cover included by Maven
Public Sector
Price Sub Total £ - - £6,500 -
Price Sub Total % 60% - 60.00% -
Total Score 100% - 98.00% -
Lot 11
WDLT 60% £ £ £ Contract award to Mavin Public
Sector  Price Sub Total £ - £63,226 £107,651 -
Price Sub Total % 60% 60.00% 35.24% -
Total Score 100% 89.65% 73.24% -
Lot 12 Package
Combining Lots 1, 2 and 3 60% £ £ £ Contract award to Mavin Public
Sector  Price Sub Total £ - £898,464 - -
Price Sub Total % 60% 60.00% - -
Total Score 100% 89.65% - -
Lot 13 Package 
Combining Lots 2 and 3 60% £ £ £ Not awarded - Lot 12 Package was
the best option for the Council. Price Sub Total £ - £498,802 - £694,433
Price Sub Total % 60% 60.00% - 43.10%
Total Score 100% 89.65% - 66.00%
Page 21

Page 22

Page 22

Page 23

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution and Property
Tendering Committee: 21 September 2022
___________________________________________________________________
Subject: Contract Authorisation Report – Supply and Fit of AV Equipment
at Denny Civic Theatre, Dumbarton
1. Purpose
1.1 The purpose of this report is to seek the approval of the Tendering Committee
to authorise the Manager of Legal Services to conclude the award of the
contract for Supply and Fit of AV Equipment at Denny Civic Theatre,
Dumbarton.
2. Recommendations
2.1 It is recommended that the Tendering Committee:
a) Authorise the Manager of Legal Services to conclude on behalf of West
Dunbartonshire Council (the Council), the award of the contract for Supply
and Fit of AV Equipment at Denny Civic Theatre, Dumbarton to SSUK
Limited; and
a) Note that the contract shall be for a maximum period of three months and
at a value of £261,426 ex VAT and £313,711 incl VAT. The estimated
commencement date of the contract is 3 October 2022.
3. Background
3.1 The Denny Civic Theatre is located in Dumbarton town centre and is owned by
the Council but operated and managed by West Dunbartonshire Leisure Trust
on the Council's behalf.  The centre has been closed since the start of the
Covid pandemic, however prior to closure it hosted events from local theatre
groups, dance shows and live music.
3.2 The Council is now seeking a suitably qualified contractor to supply and install
the latest range of sound and lighting equipment to enable a wide variety of
theatrical, dance and similar shows to take place. The Denny Civic Theatre is
currently unable to function as a working theatre as there is no Audio/Visual
equipment to support stage performances which is impacting on the ability of
the venue to generate revenue.
3.3 The budget for Supply and Fit of AV Equipment at Denny Civic Theatre,
Dumbarton was approved at the Cultural Committee on 18 February 2022. The
quotation received is beyond what had originally been anticipated in advance
for this element however remains within the overall funding envelope for the
Denny Civic project. This procurement exercise has been conducted in
accordance with the Council’s Standing Orders and Financial Regulations and
the Public Procurement Regulations. A Contract Strategy was also approved
on 18 August 2022.
ITEM 7
Page 23

Page 24

4. Main Issues
4.1 The Scotland Excel framework agreement 0618 Audio Visual, Lot 1 Audio
Visual Equipment for Audio Visual was identified as providing best value. A
Direct Award was identified as the route to market due to the tight timescales
and to enable the Denny Civic Theatre to recommence to host events from
local theatre groups, dance shows and live music.
4.2 It is recommended that the contract is awarded to SSUK Limited, 45 Queen
Elizabeth Avenue, Hillington Industrial Estate, Glasgow, G52 4NQ United
Kingdom.  The contract shall be for a period of three months at a value of
£261,426 ex VAT. The value of the contract is below the value approved by the
Cultural Committee.
4.3 SSUK Limited has committed to paying all staff as a minimum the real Living
Wage (£9.90 per hour) and promotes Fair Working Practices across their
organisation.  Further, SSUK Limited has committed to delivery of the following
social benefits as a direct result of delivery of this contract:
• Donation of £1,200 to support a local community project.
The social benefits will be discussed at the implementation meeting with SSUK
Limited and actions to take these forward will be agreed.
5. People Implications
5.1 There are no people implications.
6. Financial and Procurement Implications
6.1 Financial costs in respect of this contract will be met from the approved capital
budgets of Citizens, Culture and Facilities.
7. Risk Analysis
7.1 Failure to implement Supply and Fit of AV Equipment at Denny Civic Theatre,
Dumbarton will impact on the ability of the venue to generate revenue through
hosting events from local theatre groups, dance shows and live music
7.2 SSUK Limited has no known links to Serious and Organised Crime which
would have significant political and reputational ramifications for the Council.
8. Equalities Impact Assessment (EIA)
8.1 An equalities impact assessment screening was undertaken by West
Dunbartonshire Leisure Trust which determined a full equalities impact
assessment was required which has been carried out. 
9. Consultation
9.1 Consultation has taken place with West Dunbartonshire Leisure Trust, Citizen,
Culture and Facilities, Finance Services and Legal Services.
Page 24

Page 25

10. Strategic Assessment
10.1 The Supply & Fit of AV Equipment at Denny Civic Theatre, Dumbarton will
contribute to the delivery of the Council’s strategic priorities:
• Efficient and effective frontline services that improve the everyday lives of
residents.
Name:  Angela Wilson
Designation:  Chief Officer – Supply, Distribution and Property
Date: 5 September 2022
Person to Contact: Michelle McKenzie, Senior Procurement Officer,
Corporate Procurement Unit 
Telephone 01389 737484  
Email: michelle.mckenzie@west-dunbarton.gov.uk
Appendices: None
Background Papers: The Contract Strategy
EIA Screening
Wards Affected: None
Page 25

Page 26

Page 26

Page 27

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution and Property
Tendering Committee: 21 September 2022
___________________________________________________________________
Subject: Contract Authorisation Report – Demolition of the Former Care
Home at 2 Ashtree Court, Old Kilpatrick
1. Purpose
1.1 The purpose of this report is to seek the approval of the Tendering Committee
to authorise the Manager of Legal Services to conclude the award of the
contract for Demolition of the Former Care Home at 2 Ashtree Court, Old
Kilpatrick.
2. Recommendations
2.1 It is recommended that the Tendering Committee:
a) Authorise the Manager of Legal Services to conclude on behalf of West
Dunbartonshire Council (the Council), the award of the Contract for
Demolition of the Former Care Home at 2 Ashtree Court, Old Kilpatrick to
Central Demolition Ltd.
b) Note that the contract shall be for a period of three months. The estimated
commencement date of the contract is 1 October 2022.
3. Background
3.1 The purpose of the tender was to identify a single contractor who could provide
demolition services to the former Mount Pleasant Care Home, 2 Ashtree Court,
Old Kilpatrick, G60 5JD, including clearing the site and ensuring that the site is
clean from contamination.
3.2 The overall budget for the Demolition of the Former Care Home at 2 Ashtree
Court, Old Kilpatrick was approved by the Housing and Communities
Committee on 3 February 2021. 
3.3 This procurement exercise has been conducted in accordance with the
Council’s Standing Orders and Financial Regulations and the Public
Procurement Regulations.  A Contract Strategy document was also approved
on 23 June 2022.
4. Main Issues
4.1 The Scotland Excel framework agreement (FA) for Demolition and
Deconstruction Works was identified as providing best value. Seven potential
contractors out of 17 contractors expressed an interest, with six contractors
submitting a response by the deadline on 9 August 2022.
The evaluation was carried out in accordance with the mini competition call-off
guidance.  The contractors’ technical evaluations from the original Scotland
ITEM 8
Page 27

Page 28

Excel FA (accounting for 30%) were taken forward and applied to the
contractors’ price return (Price accounting for 70%), under the mini-competition,
to give a total tender score out of 100%.
4.2 The six submissions were evaluated by representatives from Housing and
Environment, Corporate Procurement Unit, against a set of award criteria which
was based on Price /Quality ratio of 70% / 30%. 
The scores relative to the
award criteria of each contractor are as follows:
Weighting Bardem
Limited
Caskie
Limited
Central
Demolition
Ltd
Dem-
Master Ltd
George
Beattie &
Sons Ltd
JCJ Group
Quality Sub-Total
30%:
(30%) 21.5% 25% 26.6% 27.1% 28.4% 25.3%
Total Price £ - £95,966.00  £107,442.75  £97,930.00  £119,810.00  £143,515.20  £114,575.00
Price Sub Total % (70% 70% 62.3 % 68.6% 56% 46.8% 58.7%
Total Score 100% 91.5% 87.3% 95.2% 83.1% 75.2% 84%
4.3 It is recommended that the contract is awarded to Central Demolition Ltd of
Bonnybridge, who has provided the most economically advantageous mini
competition.  The contract shall be for a period of three months. The value of
the contract is below the value approved by the Housing and Communities
Committee. 
4.4 Central Demolition Ltd has committed to paying all staff as a minimum the real
Living Wage (£9.90 per hour) and promotes Fair Working Practices across their
organisation.  Central Demolition Ltd has committed to delivery of the following
social benefits as a direct result of delivery of this contract:
• Supporting the reduction of non-recyclable materials throughout the West
Dunbartonshire area.
The social benefits will be discussed at the implementation meeting with
Central Demolition Ltd and actions to take these forward will be agreed. 
5. Financial and Procurement Implications
5.1 Financial costs in respect of this Contract will be met from the approved Capital
budget of Housing and Environment.
5.2 This procurement exercise was conducted in accordance with the agreed
Contract Strategy produced by the Corporate Procurement Unit in close
consultation with Housing and Environment officers and the provisions of
Page 28

Page 29

Contract Standing Orders, the Financial Regulations and Public Procurement
Regulations.
6. Risk Analysis
6.1 Appointment of an experienced contractor with a good reputation in demolition
will limit the risk of hazardous substances contaminating a residential area and
will eliminate the ongoing risk of vandalism or fire. 
6.2 Central Demolition Ltd has no known links to Serious and Organised Crime
which would have significant political and reputational ramifications for the
Council.
6.3 Should the Tendering Committee decide not to proceed as recommended then
this will delay the project, may have financial implications and reputational
ramifications.
7. Equalities Impact Assessment (EIA)
7.1 An equalities screening was undertaken for this report to determine if there is
an equalities impact. The results where that there is no equalities impact.
8. Consultation
8.1 Housing and Environment, Finance Services and Legal Services have been
consulted on the contents of this report.
9. Strategic Assessment
9.1 The Demolition of the Former Care Home at 2 Ashtree Court, Old Kilpatrick will
contribute to the delivery of the Council's strategic priorities:
• Efficient and effective frontline services that improve the everyday lives of
residents.
Name:  Angela Wilson
Designation:  Chief Officer – Supply, Distribution and Property
Date: 6 September 2022
Person to Contact: Daniel Cullen
Procurement Officer 
Daniel.Cullen@west-dunbarton.gov.uk
Appendices: None
Background Papers: Contract Strategy
Page 29

Page 30

EIA Screening
Wards Affected: Clydebank Waterfront
Page 30

Page 31

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution and Property
Tendering Committee: 21 September 2022
___________________________________________________________________
Subject: Contract Authorisation Report – Cycle to Work Scheme  
1. Purpose
1.1 The purpose of this report is to seek the approval of the Tendering Committee
to authorise the Manager – Legal Services to conclude the award of the
contract for the Provision of a Cycle to Work Scheme.
2. Recommendations
2.1 It is recommended that the Tendering Committee:
a) Authorise the Manager – Legal Services to conclude on behalf of West
Dunbartonshire Council (the Council), to award the contract for the
Provision of a Cycle to Work Scheme to Halfords Ltd.;
b) Note that the contract shall be for a period of two years with the option of
two 12 month extensions and at a value of £92,000 ex VAT over two
years and £92,000 ex VAT should the contract be extended for two years.
However the actual value of the contract is dependent on participation in
the scheme.  The estimated commencement date of the contract is 5
October 2022;
3. Background
3.1 The Income Tax (Earnings and Pensions) Act 2003, chapter 3, section 244
allows an annual tax exemption, which allows employers to loan cycles to
employees as a tax-free benefit. Under the proposed scheme, every eligible
employee qualifies for a maximum of £1,000 to spend against a bike of their
choice. The Council purchases the bikes on the employees’ behalf and leases
it to the employee to cycle to work on. The Council recoups the bike cost
through a salary sacrifice process. Employees make salary sacrifices for a set
period of time to cover the cost of the bike, after which time ownership of the
bike is transferred from the Council to the employee.
3.2 A benefit of the Cycle to Work Scheme is that it can provide an income to the
Council.
3.3 The overall budget for Cycle to Work Scheme was approved at the Corporate
Services Committee on 22 August 2018.
3.4 This procurement exercise has been conducted in accordance with the
Council’s Standing Orders and Financial Regulations and the Public
Procurement Regulations.  A Contract Strategy document was also approved
on 5 September 2022. 
ITEM 9
Page 31

Page 32

4. Main Issues
4.1 The Eastern Shires Purchasing Organisation (ESPO) framework agreement
(FA) was identified as providing best value.
4.2 Analysis of the suppliers’ offerings on the FA lot for Cycle to Work Scheme
resulted in the offerings being comparably similar to each other in respect of
offering the same National Insurance Contributions (NIC)/Tax savings to
employer / employees. The offerings differed in relation to areas such as range
of bikes / safety equipment offered and added value services such as safety
checks.
4.3 Further analysis of the suppliers’ offerings on the FA identified two suppliers
capable of providing this. Below is a table of the suppliers and rebate amount
offered:
Supplier Rebate % Comments
Halfords Ltd 12.5% On bikes purchased at Halfords Ltd’s stores
(approximately 90% of bikes purchased on
the scheme)
Wider Plan Ltd 5% Wider Plan Ltd are the supplier though the
delivery is through Halfords Ltd
4.4 Halfords Ltd has a presence in the Council area with a store in Dumbarton.  As
with the previous contract, the employees would also be able to purchase bikes
under the scheme from two local independent stores, Cycleform in Hardgate,
Clydebank, and Magic Cycles in Bowling. Purchasing from these three stores
will help to support local people in employment at the stores and local
businesses. 
4.5 In addition to the standard NIC savings for employers and tax savings for
employees, Halfords Ltd offer the following benefits as part of the Cycle To
Work Scheme:
• 12.5% Council cashback or £27,500 over four years;
• Guaranteed access to sales & promotional prices at Halfords Ltd and
official subsidiaries;
• Lifetime safety check on all cycles obtained through the scheme;
• Lifetime guarantee on all Halfords brand cycles;
• 10% discount on all things cycling with Halfords and official subsidiaries
for 12 months; and
• Employees will benefit from 12.5% of their purchase value in free
accessories when they redeem their bike at Halfords and official
subsidiaries.
4.6 It is recommended that a contract is awarded to Halfords Ltd, of Redditch,
Worcestershire as the supplier who provides best value for the Council’s
requirements. The overall estimated value of the contract including the
extension periods is estimated to be £184,000 ex VAT, however the actual
value of the contract is dependent on participation in the scheme.
Page 32

Page 33

4.7 There are no specific social benefits associated with this contract, however
further social benefits will be discussed with Halfords Ltd and any actions to
take any social benefits forward will be agreed and will be monitored as part of
the Contract and Supplier Management Policy.
5. People Implications
5.1 The Cycle to Work scheme is an employee benefit, with personal savings
realised through tax and National Insurance benefits. The scheme is part of the
Council’s Employee Wellbeing Strategy and the promotion of active travel and
healthy lifestyles.
5.2 Employees will benefit from the salary sacrifice arrangement allowing them to
spread payments over 18 months. 
6. Financial and Procurement Implications
6.1 There will be no financial costs in respect of this Framework Agreement.
6.2 This procurement exercise was conducted in accordance with the agreed
Contract Strategy produced by the Corporate Procurement Unit in close
consultation with People and Technology officers and the provisions of
Contract Standing Orders, the Financial Regulations and Public Procurement
Regulations.
7. Risk Analysis
7.1 Halfords Ltd have no known links to Serious and Organised Crime which would
have significant political and reputational ramifications for the Council.
8. Equalities Impact Assessment (EIA)
8.1 An equalities screening was undertaken for this report to determine if there is
an equalities impact and the results where there is no equalities impact. 
9. Consultation
9.1 People and Technology, Finance Services and Legal Services have been
consulted on the contents of this report.
10. Strategic Assessment
10.1 The Cycle to Work Scheme will contribute to the delivery of the Council's
strategic priorities:
• A Strong local economy and improved employment opportunities;
Name:  Angela Wilson
Designation:  Chief Officer – Supply, Distribution and Property
Date: 7 September 2022
Page 33

Page 34

Person to Contact: Jennifer Darkins, Procurement Officer,
Corporate Procurement Unit
e-mail: Jennifer.darkins@west-dunbarton.gov.uk
Appendices: N/A
Background Papers: Contract Strategy
EIA Screening
Wards Affected: All Council Wards
Page 34