Page 1

Agenda
Meeting of 
Shared Services Joint Committee
Date: Tuesday, 18 April 2023
Time: 11.00 am
Format: Hybrid Meeting
Contact:   Carol-Ann Burns, Senior Democratic Services Officer
Email: carol-ann.burns@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Shared Services Joint Committee as detailed
above.  
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton, G82 1QL.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Inverclyde Council
Councillor Graeme Brooks
Councillor Michael Cassidy
Councillor Christopher Curley
Councillor Michael McCormick
Louise Long, Chief Executive 
Stuart Jamieson, Director of Environment
and Regeneration 
Iain Strachan, Head of Legal, Democratic,
Digital and Customer Services
Steven McNab, Head of Organisational
Development, Human Resources and
Communications 
West Dunbartonshire Council
Councillor David McBride
Councillor Michelle McGinty
Councillor Lawrence O’Neill
Councillor Martin Rooney 
Peter Hessett, Chief Executive
Alan Douglas, Chief Officer –
Regulatory and Regeneration
Gail MacFarlane, Chief Officer –
Shared Service Roads and
Neighbourhood 
Laurence Slavin, Chief Officer –
Resources
Victoria Rogers, Chief Officer – People
and Technology
Andi Priestman, Shared Service
Manager – Audit and Fraud 
Date of issue:  6 April 2023
Page 2

Page 3

SHARED SERVICES JOINT COMMITTEE
Inverclyde and West Dunbartonshire Councils
TUESDAY, 18 APRIL 2023
AGENDA
1 APPOINTMENT OF CHAIR AND VICE CHAIR
In terms of the Standing Orders, the Joint Committee is requested to consider the
appointments of a Chair and Vice-Chair for the next two years.
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on the agenda and the reason for such declarations.
4 RECORDING OF VOTES
The Committee is asked to agree that all votes taken during the meeting will be
done by roll call vote to ensure an accurate record.
5 MINUTES OF PREVIOUS MEETING 5 - 6
Submit for approval as a correct record, the Minutes of Meeting of the Shared
Services Joint Committee held on 19 January 2022.
6 SHARED SERVICES 7 - 47
Submit report by the Chief Executive, Inverclyde Council and the Chief
Executive, West Dunbartonshire Council providing the findings of the
independent evaluation on the review of Shared Services and making
recommendations in respect of the future activity in this area.
Page 3

Page 4

Page 4

Page 5

SHARED SERVICES JOINT COMMITTEE – 19 JANUARY 2022
________________________________________________________________________
Shared Services Joint Committee
Wednesday 19 January 2022 at 2pm
1-2
3
4
Present:
Inverclyde Council
Councillors Jackson, Brooks, Curley and McVey.
West Dunbartonshire Council
Councillors McBride and McLaren.
Chair: Councillor Jackson presided.
In attendance:
Inverclyde Council
Louise Long, Chief Executive; Stuart Jamieson, Interim Service Director Environment &
Economic Recovery; Anne Sinclair, Interim Head of Legal & Democratic Services; Andi
Priestman, Shared Service Manager Audit & Fraud; Allan McDonald, ICT Services
Manager; Anne-Marie Bagstad Committee Officer and Lindsay Carrick Senior Committee
Officer.
West Dunbartonshire Council
Joyce White, Chief Executive; Gail MacFarlane, Shared Head of Service Roads &
Transportation and Laurence Slavin, Chief Officer Resources.
This meeting was held via WebEx videoconferencing and streamed live on YouTube
Shared Services Joint Committee - 19 January 2022 2pm - YouTube.
The following paragraphs are submitted for information only, having been dealt
with under the powers delegated to the Committee.
Apologies, Substitutions and Declarations of Interest
Apologies for absence were intimated on behalf of Provost William Hendrie and
Councillor Lawrence O’Neill (West Dunbartonshire Council); Councillor Alan Moir
Councillor Vaughan Moody, Councillor Andrew Polson, Chief Exec Gerry Cornes and
Depute Chief Exec Ann  Davie  (East Dunbartonshire Council).
There were no substitutions or declarations of interest intimated.
Minute of Previous Meeting
The Minute of Meeting of the Shared Services Joint Committee held on 11 December
2020 was submitted and approved as a correct record by Cllr Brooks.
Changes to the Procedural Standing Orders of the Shared Services Joint
Committee
ITEM 5
Page 5

Page 6

SHARED SERVICES JOINT COMMITTEE – 19 JANUARY 2022
________________________________________________________________________
There was submitted a Report by the Interim Head of Legal & Democratic Services,
providing an update on the Shared Service Joint Committee following the withdrawal of
East Dunbartonshire Council, requesting that the Committee consider the proposed
changes and seeking agreement to the proposed changes to the Procedural Standing
Orders.
Having heard the Interim Head of Legal & Democratic Services in further explanation of
the report and in answer to Member’s question, the Committee :-
Decided:
(1) that the terms of the Report be noted; and
(2) that the proposed changes to the Procedural Standing Orders should be agreed.
5 Roads, Transportation, Fleet, Waste and Grounds Services Update
There was submitted a Report by the Shared Head of Service Roads & Transportation to
update the Committee on the delivery of the Roads and Environmental Shared Service
and the implementation of the Interim Management Model in Grounds Services;
recommending that the Committee note the contents of the Report.
Having heard the Shared Head of Service Roads & Transportation in further explanation
of the report and in answer to Member’s question, the Committee agreed:-
Decided:
(1) that the terms of the Report and Appendices be noted; and
(2) that it be noted that a further report will be brought within 6 months, to a future
and Joint Shared Services Committee meeting; detailing the progress to date and
future plans identifying savings and potential future savings of the model.
6 Internal Audit and Fraud Update
There was submitted a Report by the Shared Service Manager Audit and Fraud,
providing an update on progress across the Internal Audit and Fraud service
collaboration, including short and medium term plans; recommending that the Committee
notes the contents of the report and progress against the current action plan.
Having heard the Service Manager Audit and Fraud in further explanation of the report,
the Committee :-
Decided:
(1) that the terms of the Report and Appendix 1 be noted.
Page 6

Page 7

Shared Services Joint Committee
Report by Louise Long (Chief Executive of Inverclyde Council) and
Peter Hessett (Chief Executive of West Dunbartonshire Council)
Date of Meeting 18 April 2023
___________________________________________________________________
Subject: Shared Services
1. Purpose
1.1 The purpose of this report is to provide the Joint Committee with the findings of the
independent evaluation on the review of Shared Services and to make
recommendations in respect of the future activity in this area.
1.2 A shared service model has been developed between East Dunbartonshire Council,
West Dunbartonshire Council and Inverclyde Council since 2017 to share roads and
transportation services. Over time, the remit has expanded to include waste, fleet,
grounds and internal audit, however activities have focussed primarily on the
activities of managers as opposed to frontline staff.
1.3 East Dunbartonshire Council did not pursue participation in the shared service and
formally withdrew from the project in January 2022.
1.4 An independent evaluation of Shared Services was jointly commissioned in October
2022 by West Dunbartonshire Council and Inverclyde Council to consider the future
of the shared service model. The evaluation was carried out by MKA Economics, a
copy of which is contained in Appendix 1.
1.5 The evaluation highlights a number of positives, as well as a number of negatives,
however concludes that the current model is unsustainable. Officer recommendation
is to dissolve the roads, waste, fleet, and grounds areas of operation whilst seeking a
further report in respect of the internal audit function.
2. Recommendations
2.1 It is recommended that the Joint Committee:
(a) Note the independent evaluation of Shared Services.
(b) Agree that a report on the Shared Services provision between West
Dunbartonshire Council and Inverclyde Council be presented to the respective
Councils, seeking to (i) dissolve the arrangement for Roads, Waste, Grounds,
and Fleet and (ii) continue the arrangement for Internal Audit services pending
a further report.
ITEM 6
Page 7

Page 8

3. Background
3.1 An outline business case was developed in 2017 in relation to a proposed shared
roads and transportation service between West Dunbartonshire Council, East
Dunbartonshire Council and Inverclyde Council.
3.2 The business case was refined in 2018 to develop a shared service for Roads and
Transportation.  It also set up a Shared Service Joint Committee.
3.3 A Head of Shared Service commenced in 2019 to strategically lead the Roads and
Transportation Services, develop strategic business cases for services shared across
wider front line services and to implement the management model of a wider shared
service. The current operating model is a collaborative management model.
3.4 The Head of the Shared Service’s remit was expanded to include Waste, Grounds and
Fleet Services in October 2019 for West Dunbartonshire Council and April 2020 for
Inverclyde Council.
3.5 Further to the development of additional business cases and approvals, a Shared
Internal Audit Manager and a Shared Waste and Fleet Manager were appointed in
January and April 2020 respectively with an Interim Grounds management model
implemented in May 2021. East Dunbartonshire Council (EDC) withdrew from the
project in January 2022.
3.6 Inverclyde Council employs the Shared Head of Shared Service, whilst two former
Inverclyde employees fulfil the Service Manager roles in  Waste and Internal Audit
and are employed by West Dunbartonshire Council. The Grounds Manager has been
a West Dunbartonshire employee throughout.
3.7 An independent evaluation of Shared Services was jointly commissioned in October
2022 by West Dunbartonshire Council and Inverclyde Council to consider the future
of the shared service model. The evaluation was carried out by MKA Economics, a
copy of which is contained in Appendix 1.
3.8 The evaluation considered:
• How have the original objectives been achieved?
• What has worked, successes?
• What hasn’t worked, challenges?
• The benefits of continuing?
• The benefits of discontinuing?
3.9 The evaluation highlights a number of strengths, as well as a number of weaknesses
in relation to the current arrangement including: 
Page 8

Page 9

Strengths Weaknesses
• Allows continued platform for
sharing ideas and best practice
• Build on good communication and
best practice sharing to date
• Offers modest cost savings
• Potential loss of benefits/objectives
due to capacity issues
• Lack of consistent systems (payroll,
HR, legal) overseeing the Shared
Service
• No further annual cost savings
without new shared posts
• Challenging geographical locations
The report concludes that the current model is unsustainable.
4. Proposals
4.1 The Officer recommendation is to dissolve the roads, waste, fleet, and grounds areas
of operation and to seek a further report in the autumn in respect of the internal audit
function. Delivery of Internal Audit Services has a number of different considerations,
given the nature of the services in question, and there are a number of  examples
in other Scottish local authorities where a shared service arrangement is  understood
to work well, notwithstanding the conclusions of MKA Economics. As such, the Officer
recommendation is to continue the current arrangement for the provision of Internal
Audit services until this further report has been considered. This will result in formal
withdrawal from the Shared Services in respect of roads, waste, fleet, and grounds
areas of operation, with the need for appropriate reports to the Joint Committee and,
in turn, Council meetings, where approval to this proposal will be sought.
4.2 In terms of staff, the solution proposed will be that the Head of Shared Service will see
their employment conclude with Inverclyde Council and become a West
Dunbartonshire employee at Chief Officer level. The shared Grounds Service Manager
will revert to their substantive post within West Dunbartonshire Council given this was
an interim arrangement. The shared Service Manager Internal Audit will remain in their
substantive post at West Dunbartonshire pending the further report and any impact on
employees would be assessed as part of any business case. The  shared Waste and
Fleet Service Manager will conclude their employment with West Dunbartonshire
Council and will once again become an Inverclyde Council employee reverting to the
role of Service Manager Waste and Grounds.
5. Implications
5.1 Legal
There are a number of legal and risk implications from this report, including from a
contractual, employee and operational perspective. The discussions that have been
undertaken to date between the Councils and going forward through the Shared
Services Joint Committee, will enable both authorities to partially withdraw from and
Page 9

Page 10

adapt the current shared services arrangements in a manner that still enables both to
meet their regulatory obligations and duties as employers, and do so in an open and
transparent manner. Moving forward, it is considered that the proposals will result in
more resilient and effective services for Inverclyde Council. In respect of West
Dunbartonshire Council, further to a structural review and consideration of strategic
outcomes and operational requirements the proposals will ensure West
Dunbartonshire Council continues to deliver best value and efficient services that are
fit for the future The current Minute of Agreement that regulates the shared services
arrangements provides for at least an 18 month notice period should one party
choose to withdraw, with that party also being responsible for the costs associated
with such withdrawal, including severance costs. It is anticipated that through
negotiation that notice period will not be required, and that each authority will each
meet their own costs.  The existing governance arrangements will be reviewed as
part of any continuation of the shared services arrangements.
SUBJECT YES NO N/A
Financial x
Legal/Risk x
Human Resources x
Strategic (LOIP/Corporate Plan) x
Equalities & Fairer Scotland Duty x
Children & Young People’s Rights & Wellbeing x
Environmental & Sustainability x
Data Protection x
5.2 People
Employees affected will be treated in line with the terms and conditions of their current
employer until the commence their new position. Thereafter the new employing
authority’s terms will apply and their positions will be funded by the resultant employing
council. All affected employees have indicated a willingness to accept the alternative
offers.
5.3 Financial and Procurement
Any financial implications arising from these proposals will be managed by the
individual councils.
6. Equalities Impact Assessment (EIA)
6.1 This report has been considered under the Corporate Equalities Impact
Assessment (EqIA) process with the following outcome:
Page 10

Page 11

Shared Services Joint Committee Report.docx
YES –  Assessed as relevant and an EqIA is required.
x
NO –  This report does not introduce a new policy, function or strategy
or recommend a substantive change to an existing policy,
function or strategy.  Therefore, assessed as not relevant and no
EqIA is required.  Provide any other relevant reasons why an
EqIA is not necessary/screening statement.
7. Environmental Sustainability
7.1 There are no environmental / climate change impacts which arise directly from this
report.
Has a Strategic Environmental Assessment been carried out?
YES –  Assessed as relevant and a Strategic Environmental Assessment
is  required.
x
NO –  This report does not propose or seek approval for a plan, policy,
programme, strategy or document, which is like to have significant
environmental effects, if implemented.
8. Consultation
8.1 None.
Louise Long  Peter Hessett
Chief Executive Chief Executive
Inverclyde Council West Dunbartonshire Council
Person to Contact: Louise Long
louise.long@inverclyde.gov.uk
Peter Hessett
peter.hessett@west-dunbarton.gov.uk
Background papers: None
Page 11

Page 12

Page 12

Page 13

Review of Shared Services
An Independent Evaluation
Final Report
Inverclyde Council and West Dunbartonshire Council
March 2023
Appendix 1
Page 13

Page 14

Review of Shared Services: An Independent Evaluation 
TABLE OF CONTENTS 
EXECUTIVE SUMMARY ............................................................................................................ I
1 INTRODUCTION ................................................................................................................ 1
INTRODUCTION ......................................................................................................................... 1
BACKGROUND .......................................................................................................................... 1
EVALUATION ASSUMPTIONS AND LIMITATIONS ............................................................................ 1
EVALUATION METHODOLOGY .................................................................................................... 3
2 CONSULTATION FINDINGS – PROGRESS TO DATE ................................................... 5
INTRODUCTION ......................................................................................................................... 5
ENSURING VALUE FOR MONEY .................................................................................................. 5
ENSURING LONG TERM RESILIENCE .......................................................................................... 7
ALIGN WITH LOCAL STRATEGIES ................................................................................................ 8
ALIGN WITH NATIONAL STRATEGIES ........................................................................................ 10
SUCCESSES ........................................................................................................................... 12
CHALLENGES ......................................................................................................................... 14
BENEFITS OF CONTINUING ....................................................................................................... 16
BENEFITS OF DISCONTINUING ................................................................................................. 16
SUMMARY, FINAL COMMENTS AND REMARKS ........................................................................... 17
3 CONSULTATION FINDINGS – MOVING FORWARD .................................................... 19
INTRODUCTION ....................................................................................................................... 19
DISSOLUTION ......................................................................................................................... 19
STATUS QUO ......................................................................................................................... 20
REFINE .................................................................................................................................. 21
STEP CHANGE ........................................................................................................................ 21
SUMMARY .............................................................................................................................. 22
4 FINDINGS, OBSERVATIONS AND RECOMMENDATIONS .......................................... 23
KEY FINDINGS ........................................................................................................................ 23
OBSERVATIONS AND RECOMMENDATIONS................................................................................ 24
APPENDIX: SWOT ANALYSIS .............................................................................................. 26
DISSOLVE SWOT ................................................................................................................... 26
STATUS QUO SWOT ............................................................................................................. 27
REFINE SWOT ........................................................................................................................ 28
STEP CHANGE SWOT ........................................................................................................... 29
Page 14

Page 15

Review of Shared Services: An Independent Evaluation
i
Executive Summary
Introduction
MKA Economics was commissioned by Inverclyde Council (IC) and West Dunbartonshire
Council (WDC) in October 2022 to review the implementation of shared services to date and to
make a recommendation on the options for shared services moving forward.
This was a consultative led evaluation, including 16 face-to-face (virtual) structured interviews
with elected members and officers of Inverclyde Council and West Dunbartonshire Council. The
structure was to gain views of progress towards stated objectives to date, the successes and
challenges to date and to make a recommendation on the options for shared service moving
forward. 
A Draft Report was issued to IC and WDC on 18th November 2022, responses from IC and
WDC were received on 14th December 2022. These comments were reviewed and reflected
in a Draft Final Report. A Draft Final Report was issued on 21st December 2022, with final
comments provided to the consultant team on 27th February and a Final Report completed on
1st March 2023.
Progress to Date
In February 2018 a shared services business case was agreed between IC and WDC with East
Dunbartonshire Council (EDC) being involved in a Lead (Host) Council arrangement, with the
following strategic and operational benefits:
• Lead (Host) Council is an established and respected delivery model in roads;
• Provides best opportunity to protect in-house resilience of service delivery
• Job security and career prospects enhanced
• No procurement required to establish
• Provide mandate and focus to align standards and specifications to improve efficiency
• Ease of pulling staff expertise and other resources in short term
• Ability to be flexible to future change, to add other partners and other service areas
• Partners can retain their own identity and local accountability
• Low risk of service disruption during transition to new service, and potential to phase
introduction
Page 15

Page 16

Review of Shared Services: An Independent Evaluation
ii
• Low set-up costs
• Ease of transfer of operating licences etc
• Ability to make quick gains and efficiencies around productivity and procurement
• Provides access to best operational and business support practices across partners
• Ability to change cultures and be more customer focused
It is recognised that the shared service model was never fully endorsed, and encountered early
challenges which resulted in a voluntary collaborative model being adopted. The preferred
model for roads, and the preferred tripartite model including EDC did not transpire. A Business
Transformation Manager post was not recruited and the model was pushed through as a result
of retirals and was not properly developed. It did not gain any real traction, there were perceived
concerns amongst staff and Trade Unions, and it suffered from notable changes in political
views in West Dunbartonshire.  A voluntary collaborative model was established in 2018.
However, there has been a genuine effort to forge a coterminous working relationship through
a voluntary collaborative lead management model. There were regular reports and updates on
shared services to each council and the joint committee.  Management and elected officials
involved have promoted the opportunity afforded from sharing services and see the merits in
developing a collaborative ethos. However, it is also noted that there have been significant
barriers to its growth and development. 
Although there is a belief that it can work and should be assessed further.  There is also a
strong view that time and resource has been expended to make it work, and this has come up
against challenges which are unlikely to recede in the short to medium term. There would need
to be more support to staff in the shared service arrangement and a willingness to have a step
change including a strategic strategy and associated performance framework.
The authorities’ desire to share services, as well as national drive for shared services, has
somewhat diminished since it was first muted locally in 2015/16.  Respondents acknowledge
the importance of working together, where there are clear and obvious mutual benefits. It was
also noted that other areas, such as back office, and other regions, notably neighbouring
authorities, may be better placed for any future collaborative efforts. There are also growing
regional collaborative networks which are offering opportunities for cost savings and
efficiencies.
Page 16

Page 17

Review of Shared Services: An Independent Evaluation
iii
It is also fair to note that there is a degree of disappointment that an opportunity has been
missed and the shared service approach has not delivered what was originally envisaged.
Organisational challenges, changes in management, perceived threats over loss of control and
staff cuts and over-stretched working schedules have all contributed to the model not gaining
significant traction. 
This position was compounded by the fact that the shared service model never really got off
the ground, and was not delivered as set out in the original business case.  It has never truly
been a shared service, it has been a limited development of shared posts, governed by a Joint
Committee which has had a focus on monitoring progress and annual reporting over a limited
number of meetings.  
In many cases much good has come from the shared service roles, and this can continue. The
workload and method in which shared posts work across authorities is inherently challenging,
this too has been compounded by changes in organisational structures which has added a
further level of confusion to the shared service drive.  Much good work and effective work
practice continues to flow from the shared posts and there is a way in which this can continue
in a voluntary and flexible manner.  
It is not down to a lack of focus and effort to make the shared service directive work, it has
come up against challenges from the start, new challenges, and these challenges continue.  
Carrying on as it, is not an option, as is seeking to invest further in its roll-out, as it’s roll-out to
date has stumbled and not gone further than three shared posts, which are now over-stretched.
Moving Forward
Sharing resources and staff can play in addressing value for money and making savings. These
have been modest, and not of the scale as originally envisaged. The shared service saving
approach is working in certain areas, through sharing skills, knowledge, experience and best
practice, and this should be recognised by all parties. In many cases this has been achieved
through the hard work and skills of those staff in these shared posts. These posts are
increasingly challenged and the current structure does not support their short to medium
sustainability. 
There have been concerted efforts to work together, and the fact that the original
recommendation and tripartite nature of the shared service agreement was never taken forward
is an inherent weakness. 
There have been challenges to its growth and the inability to make a step change in facilitating
a model which not only make substantial savings but also clearly build resilience, these were
the aims, and these have not been achieved, only in part. 
Page 17

Page 18

Review of Shared Services: An Independent Evaluation 
iv
For example, transferring the workforce has never been progressed due to differing terms and
conditions, which were noted as being challenged by Trade Unions and staff. Similarly, the
expected benefits from procurement and sharing resources has not progressed as planned due
to legal issues and contractual issues.
The current model is not sustainable, the workloads are becoming unmanageable, and the
inability to clearly evidence the benefits of the shared posts, and clearly monitor and evaluate
an even split of resource remains a growing challenge.  Many of the expected benefits of the
Lead (Host) Council model (as set out above) have not progressed, as this model was not
ratified and were inherently challenging to be delivered in progressing a voluntary collaborative
management model. 
There are opportunities for the lessons learned to shape the work in these shared areas, the
challenges facing many public bodies are significantly more challenging now than before.
Dedicated and skilled workforce in clearly defined roles within each authority will strengthen the
required resilience at a relatively small cost. There remains scope to build on the voluntary and
flexible benefits of sharing best practice and information exchange through the growing plethora
of regional led, sector specific, virtual and physical fora and networks. In time these may create
the correct environment for a new wave of sharing services, resources, and people. 
As set out in the individual SWOT of the options and the recommendations set out in the
report, it is the review’s conclusion that unless there is a political will and a significant
guaranteed step change could be agreed, as outlined in the original proposal, the shared
posts should dissolve back to each host authority. That is not to say it has been a failure,
it can be seen as being a useful exercise to assess the ability of two authorities to share
services and skills. The good work and communications should continue and both
parties can independently seek a manner in which to make savings through sharing in
other areas, with other partners and other collaborative models. There will be cost
implications of dissolving the voluntary collaborative management model, and these will
be borne by each authority and mitigation measures may be required to avoid any
temporal risks to service delivery. 
Page 18

Page 19

Review of Shared Services: An Independent Evaluation 
1
1 Introduction
Introduction 
1.1 MKA Economics was commissioned by Inverclyde Council (IC) and West
Dunbartonshire Council (WDC) in October 2022 to review the implementation of shared
services to date and to make a recommendation on the options for shared services moving
forward.
1.2 A Draft Report was issued to IC and WDC on 18th November 2022, responses from IC
and WDC were received on 14th December 2022. These comments were reviewed and
reflected in a Draft Final Report. A Draft Final Report was issued on 21st December 2022, with
final comments provided to the consultant team on 27th February and a Final Report completed
on 1st March 2023.
Background 
1.3 As set out in the brief, an outline business case was developed in 2017 in relation to a
proposed shared roads and transportation service between West Dunbartonshire, East
Dunbartonshire and Inverclyde Councils. 
1.4 A business case was refined in 2018 to develop a shared service for Roads and
Transportation based on a Lead (Host) Council model, with IC being the lead authority. It also
set up a Shared Service Joint Committee. 
1.5 A Shared Head of Service commenced in 2019 to strategically lead the Roads and
Transportation Services, develop strategic business cases for services shared across wider
front line services and to implement the management model of a wider shared service. The
current operating model is a collaborative management model.
1.6 The Shared Service remit was expanded to include Waste, Grounds and Fleet Services
in October 2019 for WDC and April 2020 for IC.
1.7 Further to the development of additional business cases and approvals a Shared
Waste and Fleet Manager and Shared Audit Manager were appointed in April 2020 with an
Interim Grounds management model implemented in May 2021. East Dunbartonshire Council
(EDC) withdrew from the project in January 2022.  
Evaluation Assumptions and Limitations 
1.8 It is acknowledged that changes to the initial business case evolved over time, and the
recommendations for a Lead (Host) Council model for Road and Transportation did not
transpire. These findings became apparent through the review of documentation and
Page 19

Page 20

Review of Shared Services: An Independent Evaluation 
2
consultative led research. The consultant team are aware that a voluntary collaborative model
was adopted, and our understanding of the timeline is as follows:
January
2019
Shared Roads & Transportation Head of Service commenced, was not as set
out in the business case, and was a voluntary collaborative management model;
October
2019
Remit extended to include WDC Waste, Fleet and Grounds;
April 2020 Remit extended to include Inverclyde Waste, Fleet & Grounds;
April 2020 Shared Manager Waste & Fleet commenced;
December
2020
WDC restructure and Head of Service role increased in responsibility to Chief
Officer reporting direct to Chief Executive;
January
2021
Interim Shared Grounds Management Support (approval in place untilMay
2023);
September
2021
Shared Roads Manager post mothballed, after been selected and
recommended; 
April 2020 Shared Chief Internal Audit post;
October
2021
Shared Service functions and further development mothballed pending Council
Elections and pending independent review; and
October
2022
Independent review. 
1.9 It is understood that there have been other changes in structures and reporting
regimes. It is also acknowledged that the Joint Committee has been established and not met
as frequently as initially proposed impacted by Covid and the emergency arrangements put in
place in Councils. Organisational structures and more details on timelines and reports were
requested and these are noted below. These have not been critiqued in detail, but were
reviewed to build a knowledge and context for the independent review, which is based on a
consultative led approach.
1.10 Through this consultative led approach, the evaluation seeks to provide an assessment
of the implementation of the outcomes that were set out in the original business case.  The
evaluation focuses Roads and Environmental/Neighbourhood Services and Audit Services.
1.11 The evaluation is based on evidence gathering through interviews with the elected
members and officers from both WDC and IC. It did not include interviews with EDC. 
1.12 The evaluation report seeks to provide clear recommendations on the potential next
phase for the shared services. 
Page 20

Page 21

Review of Shared Services: An Independent Evaluation 
3
Evaluation Methodology
1.13 In order to conduct the independent evaluation, MKA Economics reviewed the following
documents:
February 2018 Shared Roads and Transportation Service Business Case, IC and WDC
February 2018 Roads and Transportation: Shared Service Implementation, IC
September 2019 Joint Collaboration – Audit and Fraud Services, IC and WDC
March 2020 Joint Collaboration: Fleet and Waste Service, IC and WDC
January 2021 Joint Collaboration – Interim Management Proposal (Ground and
Roads), IC and WDC 
1.14 MKA Economics then undertook face to face meetings (virtually) with the following
representatives. 
Councillor Stephen McCabe - IC
Councillor Martin Rooney - WDC
Kenny Lang, Fleet and Waste Manager – shared and employed by WDC
Steven Walker, Service Managers, Roads - IC
Liam Greene, Manager of Roads & Transportation - WDC
Councillor Jim Clocherty - IC
Gail MacFarlane, Head of Shared Services – shared and employed by IC
Councillor Michael McCormick - IC
Stuart Jamieson, Interim Director Regeneration & Environment - IC
Andi Priestman, Chief Internal Auditor – shared and employed by WDC
Laurence Slavin, Chief Officer Resources - WDC
Peter Hessett, Chief Executive - WDC
Louise Long, Chief Executive - IC
Councillor David McBride - WDC
Ian Bain, Greenspace Manager for West Dunbartonshire – WDC 
Alan Puckrin, Interim Director Finance & Corporate Governance - IC 
1.15 The interviews were structured according to an agreed set of questions, both a series
of (1) progress to date and backward looking questions, and (2) looking forward in terms of the
next potential phase for shared services.  All interviews were treated as confidential, the findings
in the following sections are a summary of the key themes which emerged from each topic area. 
1.16 In terms of report structure, the remainder of the report is structured as follows:
Page 21

Page 22

Review of Shared Services: An Independent Evaluation 
4
• Section Two: Outlines the overarching findings from the interviews in terms of progress to
date, how objectives have been progressed and a summary of the successes and
challenges from the shared services;
• Section Three: Summarises the findings from the interviews around looking forward to the
next phase of collaboration and shared services; 
• Section Four: Presents the key findings and observations around recommendations going
forward for both authorities; and
• Appendix: Sets out an overview of the strengths, weaknesses, opportunities and threats
of each option. 
Page 22

Page 23

Review of Shared Services: An Independent Evaluation 
5
2 Consultation Findings – Progress to Date 
Introduction 
2.1 This section sets out the findings from the consultation exercise in terms of progress to
date, which was structured to assess the following:
• How have the original objectives been achieved, covering
o Ensuring value for money?
o Ensuring long term resilience?
o Aligning with local council strategies?
o Aligning with national strategies?
• What has worked, successes?
• What hasn’t worked, challenges?
• The benefits of continuing?
• The benefits of discontinuing? 
Ensuring Value for Money 
2.2 Overall, it was felt that this had not been fully achieved, and only partially achieved,
and an opportunity had been missed.  It was felt that cost savings had been achieved in the
form of sharing posts, in many cases as result of not filling posts which had been vacated
through retirals. 
2.3 It was also noted that the recommendations in the original business case were also
challenged from the outset through East Dunbartonshire Council (EDC), and to a lesser extent
Argyll and Bute Council (ABC), withdrawing from the process before it commenced. 
2.4 It was felt that that value for money could have been achieved in a greater way if the
full recommendations from the Business Case had been followed through.  This set out the
recommended option being a Lead (Host) Council Model, with the following strategic and
operational benefits:
• Lead (Host) Council is an established and respected delivery model in roads;
• Provides best opportunity to protect in-house resilience of service delivery
• Job security and career prospects enhanced
• No procurement required to establish
• Provide mandate and focus to align standards and specifications to improve efficiency
Page 23

Page 24

Review of Shared Services: An Independent Evaluation 
6
• Ease of polling staff expertise and other resources in short term
• Ability to be flexible to future change, to add other partners and other service areas
• Partners can retain their own identity and local accountability
• Low risk of service disruption during transition to new service, and potential to phase
introduction
• Low set-up costs
• Ease of transfer of operating licences etc
• Ability to make quick gains and efficiencies around productivity and procurement
• Provides access to best operational and business support practices across partners
• Ability to change cultures and be more customer focused
2.5 It is recognised that the shared service model was never fully endorsed, and
encountered early challenges which resulted in a voluntary collaborative model being adopted.
The preferred model for roads, and the preferred tripartite model including EDC did not
transpire. A Business Transformation Manager post was not recruited and the model was
pushed through as a result of retirals and was not properly developed. It did not gain any real
traction, there were perceived concerns amongst staff and Trade Unions, and it suffered from
notable changes in political and operational management.
2.6 There was not clear measures or processes to monitor value for money being achieved,
and in most cases, this was often simply presented as the upfront savings to both authorities
through not refilling retired posts. The evaluation did not fully reconcile what saving was
achieved, although it was referenced as being in the region of £95k to £160k for each local
authority. However, it is unknown, or made clear to the evaluation team, what the actual cost
savings were for each authority. 
2.7 It is known that a Lead (Host) Council model was recommended in the Business Case,
but what transpired was a voluntary collaborative model which only went as far as initial cost
savings.  Due to political uncertainties in West Dunbartonshire at the time, the original
recommendations were not ratified, and a voluntary collaborative model was progressed.
2.8 It can be concluded, that although there may have been some less tangible and hard
to measure value for money benefits, the only tangible value for money indicator was the upfront
salary savings from not filling posts and replacing a small number of shared posts. 
Page 24

Page 25

Review of Shared Services: An Independent Evaluation 
7
2.9 Although there was leadership buy in to the shared service model and an initial and
early drive to create a truly integrated shared service approach this did not transpire because
of political uncertainties noted above.   
2.10 Many respondents had hoped that the initial business case and desire to develop a
Lead (Host) Council model, with the support of a Business Transformation post, this did not
happen, and inertia crept in and individual authorities acknowledged that there were inherent
challenges that were not overcome. 
2.11 That being said there were a range of harder to measure value for money activities and
successes, notably around sharing professional skills, pulling ideas and better communication
across departments.  
2.12 One clear area of benefit was in the audit and fraud services where it was felt that the
new post brought new ideas and cost effective processes into a pooled environment, although
this was felt more by WDC than IC. Similarly, it was felt that the shared posts in
Ground/Fleet/Waste also enabled a potential cost effective solution to be formed, but this was
also felt to perhaps benefit WDC more than IC. 
2.13 It also became apparent that any cost efficiencies, albeit limited, were more as a direct
result of the skills and abilities of the new shared service post holders, and not the posts, as it
was felt that these posts were unsustainable as the work required and skills required were more
a testament to the individuals and not the job descriptions, as recognised across most senior
posts in local authorities.  
2.14 There was a view that there was no clear reporting of any issues, and that services had
continued to operate effectively, notably through a trying Covid-19 period, and coupled with
savings there was a high level view that the process had been successful, but this lacked
evidence.
Ensuring Long Term Resilience 
2.15 On the whole, it was felt that although this was a critical objective, notably in small
authorities facing challenging budgetary pressures and in areas where there are skill shortages
and an ageing workforce. 
2.16 There was a consistent view that because the shared service model was not fully
delivered, and did not gain early traction or gain momentum, that resilience was actually
threatened and not enhanced. In most cases, this was reported as being an issue as resources
were spread too thinly and there was often a perceived imbalance in where resources were
deployed. As a result the aim of retaining and recruiting skilled staff in a truly shared service, in
an aging workforce, was not fully achieved.
Page 25

Page 26

Review of Shared Services: An Independent Evaluation 
8
2.17 There were hard to measure productivity gains in the form of being able to share good
practice, ideas and processes, notably in Audit/Fraud and Ground/Fleet/Waste.  Attempts were
made to share other posts, such as a Policy Manager, however, this was not progressed but
maintained by WDC who decided to partner with Argyll and Bute. However, these were more
driven by the skills, drive and ability of post holders, and were limited due to time pressures.
Similarly, they were limited due to inherent and clear challenges of full integration, notably, lack
of consistent back office functions, different terms and conditions, varying systems,
departmental structures, reporting regimes and leadership ethos. 
2.18 The Audit/Fraud Service was singled out as an area where resilience was gained, but
as noted previously, there was a perception that this was unequally shared across each
authority. The shared Ground/Fleet/Waste posts have also managed to develop a locality
based resilience model which aided resilience, but this was limited due to inherent challenges
facing these posts and the challenge in cascading work practice across each authority. 
2.19 It is fair to say that those which felt that there was greater resilience were the authorities
and departments which benefits from new talent and ideas, and not those who lost this focus
through splitting posts. The new Shared Service Head of Service post was not an existing
position in either authority and therefore there was no feeling of a loss or a gain in this area. 
2.20 It was felt there was an uneven position in terms of gains and losses to resilience
building, with perceptions that one authority was gaining to the detriment of another. This was
not seen as a ‘Pareto Improvement’1, ultimately the goal was for all parties to gain from the new
situation, but it was perceived by some that one may have gained to the detriment of another. 
Align with Local Strategies 
2.21 There was a lack of any known or formal report or strategy, or Performance
Management Framework (PMF) which outlined how the shared services policies and
procedures supported wider council strategies. It was acknowledged that the shared service
directive was embedded within each council’s corporate strategies and plans.
2.22 It was suggested that shared services was implicit across the corporate plans to
encourage value for money and to enhance resilience. The evaluation did not uncover any
specific references that it was a high level policy directive. 
1 Pareto improvement, or pareto efficiency, is a situation where some agents will gain, and no agents will lose.  
Page 26

Page 27

Review of Shared Services: An Independent Evaluation 
9
2.23 There is no knowledge of a shared service plan or strategy, and that the shared service
role was voluntary and was a collaborative management model and there was no requirement
for it to be explicit within council plans and strategies. It was never established to be a major
policy directive, more a working arrangement to support the wider delivery of other council plans
and with a focus on value for money and strengthening resilience. 
2.24 This lack of strategic framework may have challenged its ability to develop and respond
to policy changes. There is a sense that it was developed in 2017/18 to meet the need to share
services, as outlined by national government directives, and to be seen to be reacting to a
pressing need for budget cuts. This position has continued, but it is no longer the only show in
town, and the focus for savings has focused on other directives and other sharing/collaborative
models, such as the opportunities afforded through city deal and other regional/national fora
and networks. 
2.25 At the same time there have been major staff changes and changes in political
leadership which has resulted in a loss of focus and lack of planned governance.  The lack of
a shared service ethos cutting through all plans and council strategies has resulted in it
continuing in a voluntary role, without a significant level of detail and drive. 
2.26 Shared services and the voluntary management model which has evolved has proven
to be useful in cost efficiencies, and allowed better communications and sharing of ideas and
better work practices, but these are not upfront and central in key strategies.  For example,
each local authority had their own strategy for environment using the expertise of the post
holder, however, this was additional work for the postholder with duplication in process and
performance management in terms of specifics around local conditions in each authority.  
2.27 It was felt that in policy development activities, and responding to national policy and
consultation exercises, that a shared Policy Manager post in this regard would offer savings.
This post has not progressed, further stressing the lack of drive and joined up thinking in fully
absorbing a shared service ethos. 
2.28 It is felt that this lack of strategic buy in and loss of focus, and absence of key plans
and strategies from its roll out and growth has hindered it to become anything more than a
voluntary collaborative model, rather than a fully functioning shared service in the form of the
original recommendation for a Lead (Host) Council. 
2.29 There has been a lack of clear plans and PMFs to govern, monitor and development
the shared service agenda. It was correct to assess the opportunities afforded by a shared
approach, but early challenges in terms of perceived loss of control and constraints to
developing it have interfered with its ability to become a major council directive in both
authorities. 
Page 27

Page 28

Review of Shared Services: An Independent Evaluation 
10
2.30 Each authority’s own goals and efficiency savings have impacted on time and capacity
to develop the model any further, notably during the Covid-19 pandemic period. This is not to
suggest collaboration and sharing should not continue but the lack of a strategic framework has
not allowed it to develop any further. 
2.31 There is high level strategic support, as ‘do nothing’ is not an option. The challenges of
not having a clear strategy of its effectiveness and ability to make savings and improve
efficiency mean that it has been overlooked as any area which could potentially offer major
efficiencies. There may be a requirement that any future activity in this area should either be
driven by it being embedded clearly with corporate planning, or better, it leads on the
development of new corporate plans. 
Align with National Strategies 
2.32 It was noted that this strategic objective was in part set to ensure that both authorities
were to be seen to be meeting the national drive to avoid duplication, to share and work together
better. It was also assessed in how it responded to Audit Scotland, Improvement Service and
Best Value reviews.
2.33 It was felt that local authorities were forced into trying to make shared services work,
and build on some of the successes of regional authorities pre-1996. It was muted that there
had been numerous attempts to share back office services and to make regional government
work but this never transpired. There was also a willingness to attempt to make shared services
work as ‘do nothing’ would risk local authorities being forced to work together or even merge
with one another.  A further raft of local reorganisation is not an option, and seeking areas of
mutual community and political benefits should continue to be assessed, and disbanded where
these are not clear.  
2.34 Without any major political directive and platform to achieve this, this did not happen.
Attempts were made with other neighbouring authorities and it is known that it can work, but
there are many areas where it hasn’t worked. The lack of buy in from neighbouring authorities
and lack of national level guidance and drive has resulted in it losing focus and attention. 
2.35 There are areas, such as in audit and fraud where there are clear shared interests and
cost efficiencies. This could be delivered by one local authority on the other authority’s behalf. 
A Lead (Host) Council model has successfully happened in other areas, in this case would
involve TUPE of staff and moving their terms and conditions to one local authority.  However,
the manner in which this has been developed has resulted in a service which is perceived as
not being equitable. 
Page 28

Page 29

Review of Shared Services: An Independent Evaluation 
11
2.36 More development work would assist and agreeing the key areas where there are
synergies and political buy in would enhance the chance of success going forward. Similarly,
there are now other collaborative and shared practices which are being assessed by national
government such as the National Care Service and activities through the regional City Deal
which are now more of a focus than the shared service agenda. 
2.37 There are clear merits of neighbouring authorities to work together where there are
obvious and clear geographic opportunities notably roads and other environmental services.
Similarly, in areas where there are skill shortages and ageing workforce challenges and seeking
a regional approach does offer scope for future opportunities. Further discussion on other
shared services have been progressed and prior to 2022 these included HR, Legal, Policy and
Fraud.  Strong objections and procurement objections from unions and restructuring made it
difficult to progress these areas. Furthermore, WDC did not see there to be a benefit to WDC
in sharing HR and Legal services, even before they were presented to Trade Unions. This also
challenged any future desire of bring the regional road network and associated services into a
shared service function. However, this has not transpired in the WDC and IC situation, as these
are hindered by not being geographically linked or as well linked as it would with authorities
which geographically abut WDC and IC. 
2.38 These negotiations have been progressed but these is no evidence that other local
authorities have been inclined to work in this area. This may be in part down to a perceived loss
of control and perceived cuts affecting the workforce. The lack of a national drive, and
knowledge that it is not an area of national significance has resulted in it not happening to the
full extent as set out in the original business case. 
2.39 There are examples where national directive have and continue to work such as
Scotland Excel and Public Contracts Scotland, and local authorities continue to seek benefits
through these mechanisms. The current collaborative shared model lacks a coherent national
drive and local desire and has resulted in it to continue as a voluntary collaborative model.
2.40 This model is not delivering the major savings envisaged and is resulting in perceptions
as to its equitable value. The benefits from it are hard to see, and not reported, suggesting any
initial costs saving are now to the detriment of the increasing pressures being placed on shared
post holders, which in turn affects the smooth operation of the affected departments. 
2.41 The shared service model was perceived as being put together in a reactionary, or
hasty manner, one which was more ‘push’ than ‘pull’. That is not to say it did not set out to be
an effective model of collaboration, but its inability to develop significant savings questions its
future roll out and continuation. 
Page 29

Page 30

Review of Shared Services: An Independent Evaluation 
12
2.42 There are some successes in areas, such as Audit/Fraud and this is an area where a
shared service, and Lead (Host) Council model or privatisation has been shown to work
elsewhere. Likewise, the Grounds/Waste/Fleet/ function has benefited as a result of a closer
working relationship, but this has been restricted to issues in legal, procurement, payroll, HR
and IT. Each authority has different operating models and imposing shared services and
attempting to keep it alive, without a national platform has resulted in a lack of joined up
approach. 
2.43 It is known through Best Value reviews, Audit Scotland reviews and Improvement
Service briefings, that shared services remains a live option.
2.44 It could have been a major tool if more time was deployed in its development and if
there was a national desire for it to work. This did not happen, and this has resulted in a
fragmented and confusing, less transparent and equitable model being deployed. This model
is now not enabling the results as were promoted the original Business Case and this needs to
be considered going forward. 
2.45 There are other regional collaborative platforms emerging and ongoing dialogue with
other partners, it may be that the lessons of the WDC/IC model are used to inform a new model.
Similarly, the early withdrawal for other partners has governed its inability to realise its success.
Without complete political buy in, and wavering Trade Union support, suggests a new approach
must be considered. 
2.46 Sharing ideas and best practice can continue without a close collaborative
management model, and this can be expanded to include other authorities and cover other
areas of work. This also ensures that local authorities have the correct posts in place to respond
to local conditions and desires.  
Audit Scotland considers shared services a live area, but an area which is challenging in its
own right. Where the benefits aren’t clear, it loses a focus and drive. 
Successes 
2.47 There were many areas where it was felt that the collaborative, albeit voluntary, shared
management model has been a success. There is no doubting the improved information
exchange, sharing of knowledge and experience has enabled each authority to be more
effective across Audit/Fraud, Ground/Fleet/Waste and to and lesser extent Roads and
Transportation. Although the shared service model did not roll out as planned and lost traction
in Roads and Transportation, this is not to say that information flows have been hampered.
Indeed, there is a common view that these have been enhanced. 
Page 30

Page 31

Review of Shared Services: An Independent Evaluation 
13
2.48 There are examples where new ideas, practice and sharing of resources have had
mutual benefits, however, it is felt that many of these can use other conduits to enhance their
exchange and flow.  Similarly, there are perceived concerns in terms of ensuring the flow is in
both directions, rather than in an unequal manner.  IC and WDC have differing views and
perceptions on this point.
2.49 It is felt that Audit/Fraud has benefited through a more joined up manner through the
joint Chief Internal Auditor role. This has been championed by the post holder, and embraced
by the post holder, and there would be doubts if such a post could be recruited in the event of
the current post holder departing in the current labour market climate. There is evidence from
other authorities that this is an obvious area for a Lead (Host) Council model and this position
could be taken further and formalised.  To build resilience and fully support this model the TUPE
of staff from Inverclyde Council to West Dunbartonshire may be required or vice versa.  To
progress this, it would require an assessment of the success factors and lessons learned from
other local authorities in this area.
2.50 The sharing of Ground/Fleet/Waste has also been championed through forming a close
working relationship of two post holders, and a location based management model has evolved
which is also testament to those in these shared posts. Again, it is not known if these posts
would be a mutually beneficial should there be changes in personnel.
2.51 Cost savings have been modest, nonetheless they are one of the main aims of the
shared services model. By not undertaking this model these costs would have to be borne by
both authorities. There has also been no reduction in service levels, and these have been
achieved at lower cost. Although there are concerns that this position may be more down to the
skills and experiences of those in post than the success of the flawed roll-out of the model.
There is also a lack of reporting and strategic management information on their actual financial
benefits, other than cost savings. 
2.52 Furthermore, it has been felt that a more joined up approach also assisted the delivery
of core environmental services through Covid-19 pandemic, through working remotely and
sharing knowledge and ideas across departments. 
2.53 Sharing of learning, and ideas for learning amongst staff has also happened, and is
unlikely to have happened without shared management posts. Witnessing and responding to
different situations and challenges has broadened the skill base of management and
operatives. There has also been to a lesser degree some shared processes in regard to
procurement albeit there have been restrictions to making a collaborative ‘deal’ as a joint body
and looking for discounts. These have been curtailed by legal and contractual issues of
engaging with two separate legal bodies. It may be that under the Lead (Host) Council model
these opportunities may have been more forthcoming. 
Page 31

Page 32

Review of Shared Services: An Independent Evaluation 
14
2.54 In summary, communication and the sharing of information and intelligence has been
one of the major successes, and it may be that this could occur without a formal shared
collaborative model, and that it could work with other departments and other local authorities. 
2.55 There doesn’t seem to have been any notable success that would suggest it has been
a great success, and it has been operational for more than five years. There remain constraints
to it working more effectively, and there would be costs for disentangling it, however, in the
absence of major shifts in working practices and the lack of clear reporting mechanisms as to
its success, it is open to challenge on how it can be any more successful in the future. Any
future roll out of a shared service would require an agreed and ratified strategy, targets,
performance management and investment for it to progress.
Challenges 
2.56 The preferred model did not transpire in any real shape or form, it lacked buy in from
different levels and was never truly endorsed as a strategic directive by either local authority. It
is sub-optimal in size and remit, and over time it has encountered difficulties and challenges.
Even during Covid-19 when there was scope to fast track shared services and build resilience,
this did not progress. 
2.57 The Lead (Host) Council model did not come forward, although it was the
recommendation from the business case, and a voluntary collaborative model came forward
which only offered modest cost savings.
2.58 This model is now stretching the post holders. Investment is required for it to continue
in its current format. The post holders are in an ever more challenging position as the economy
recovers from the pandemic and cost savings are even more prominent now than before. There
are ongoing labour market challenges, and these posts are stretched with competing demands
of both authorities and their respective communities. 
2.59 The geographic challenges are well reported, as are the issues with back office
functions not being aligned and a lack of Trade Union buy in to help foster a true shared service
model.  There are inherent challenges in trying to marry two different structures, terms and
conditions, these have continued to be very challenging to allow the further roll out of the model
of sharing workforces. Over passage of time the management structure has changed causing
additional workload for senior officers.
2.60 There is a perceived lack of balance and inequal beneficiaries from a system which
should benefit each, without being a detriment to either.  This position is contested by WDC
and IC. Post holders have major challenges with diaries, systems and reporting. Furthermore,
they cannot cover and manage all the required communications with elected members, and
cannot be in two places at once. 
Page 32

Page 33

Review of Shared Services: An Independent Evaluation 
15
2.61 Although there is political parity, albeit a differing local political desire at the local level,
at the current time, over the last 5 years there have been political issues in West Dunbartonshire
in regard to the differing needs and concerns of elected members, these are hard to reconcile
and each area have their own differing challenges which is multiplied when working across two
political organisations.
2.62 There are lots of good ideas and information exchanges, but these could happen
without shared posts, or the voluntary collaborative model, and there are other fora for these
transactions. 
2.63 There would be obvious merit is seeking back-office shared services, and this could be
across more than the current WDC/IC partnership.  This would have been a logical place to
start and build on these areas before assessing front-facing services, and a lack of Trade Union
buy in an unknown or untested model. 
2.64 The voluntary led model lacks drive and traction, it isn’t truly integrated, and it is difficult
to see if much more can exist in the current climate. Post holders will continue to be stretched,
elected members may feel exposed, and the resilience is being weakened not strengthened
and this could be significant should post holders retire/seek new employment opportunities. 
2.65 It is unlikely an independent review would be commissioned if there were clear and
obvious savings and efficiencies, the efficiencies to date have been noted as being in the region
of £100 to £160k for each authority per annum, and this has resulted in lost talent and loss of
dedicated staff posts.  Authorities are seeking multi-million pound savings and shared services
are not providing that level of benefit. It is a missed opportunity, with many lessons for future
collaboration efforts.  Any future roll out of a shared service would have to start with the formal
collaboration, with a new business case and targets which are measurable.
2.66 There continues to be a perception that each local authority is gaining to the detriment
to the other.  This position has been clarified in the comments received to the Draft Report,
where there are clear differing views as to the flow of costs and benefits. Although there are
clear areas of success these have not been of a scale to overturn the perceived costs and risks
of the model continuing. 
2.67 The areas and authorities are too dissimilar, and there are pressures on both to be
working more effectively. The current model is perceived as being unequal and continues to
place stress on the departments and post holders to deliver a dedicated service to meet the
aims of the local communities. 
2.68 Although there are soft benefits, the challenges have not been overcome, they remain
and there is real risk that services will deteriorate, and skilled post holders may be lost to the
determinant of one or both authorities. 
Page 33

Page 34

Review of Shared Services: An Independent Evaluation 
16
Benefits of continuing 
2.69 There have been some notable benefits, around communications and sharing best
practice. Modest costs savings continue and there would be new costs to disentangle and
restructure.  The actual costs have not been clarified as part of this review, but have been noted
to be in the region of £100k to £160k per annum to each authority. Postholders and
management have committed to it and given resource, time and effort to it. 
2.70 The post holders in place are successfully delivering their roles, however, the workload
is too high, growing and therefore unsustainable. There is scope for it to continue in a less
formal and voluntary basis and the relationships and work practices can continue to be shared.
The model would have been more appropriate to neighbouring authorities and authorities with
similar structures, and perhaps best focused on back office functions. These areas should be
re-assessed.  
2.71 There are skills challenges and an ageing workforce, and the current model does in
part help alleviate some of these concerns. Disentangling it would not only be expensive, but it
would also heighten these recruitment and skills challenges, for both authorities.  There are
known shortages in certain professionals and technical professions, and these may be hard to
recruit should the shared service focus be diminished or removed.
2.72 The softer benefits of exchanging knowledge and ideas, best practices, albeit hard to
quantify, should not be undervalued, and they do aid resilience and value for money. They are
more likely to occur and strengthen over time. However, they are also driven by the skills,
energy, and desire of the post holders. A new informal model may encompass a range of virtual
and physical platforms to exchange best practice, sharing of ideas and policies.
Benefits of Discontinuing 
2.73 The shared services arrangement did not gain early traction  and it is not a major cost
saving and it is beginning to undermine the resilience of each authority. If there had been a
stronger national desire and national directive for it to happen, there would have been more
chance of it being a success. It is known that Audit Scotland recognise these challenges, and
these are consistent with other local authority partnerships.  The local challenges are
pronounced too, with a lack of buy in and support from various levels. 
2.74 The original recommendation did not happen, and has not happened, the weakened
voluntary collaborative model only offers modest benefits and softer benefits around
communication and knowledge exchange. The cost savings are extremely modest when
measured against the current budgetary constraints and challenges.  Any benefits that have
been achieved to date would be lost, and there would be a short term challenge in terms of
recruiting new posts should other posts revert to host organisations. 
Page 34

Page 35

Review of Shared Services: An Independent Evaluation 
17
2.75 There would therefore be financial costs, which have been outlined as being in the
region of £95k to £160k for each authority per annum, which in the context of the current budget
savings is not significant, but it remains a cost to each authority.  It also does not allow for
issues with recruitment, which may have a temporal impact on service provision and short-term
resilience. 
2.76 There are benefits returning to the original model of having dedicated officers within
each authority, in terms of having a focused dedicated resource and manageable workloads,
allowing staff to focus on core product and get on with their own work, resulting in less pressure
on posts and greater scope for job satisfaction and retention. 
2.77 If discontinued there would remain scope to learn from the lessons and challenges and
embark on potential new shared services with other departments, potentially focusing on back
office functions. Similarly, there is potential to focus on seeking partners in neighbouring
authorities, such as ABC and EDC for WDC, and Renfrewshire, East Renfrewshire, and North
Ayrshire for IC. 
2.78 There are also other collaborative models, and different regional efforts being led by
City Deal functions, and other initiatives such as expanding the collaboration model for school
meals Dundee model in a Greater Glasgow setting.  These new regional models were not in
existence when the shared service models was being crafted.
2.79 Although it is relatively early in the development of shared services, it has been running
for five years and is still facing challenges, even without Covid-19 pandemic it is felt that more
should have been achieved by now. 
2.80 It was also felt that with new Council elected members and a new Chief Executive in
WDC, it may also be timely to review progress to date and weight up the costs and benefits
prior to expanding or reducing a shared service ethos in each local authority. 
Summary, Final Comments and Remarks 
2.81 There was a wide range of additional comments and remarks to conclude the
interviews. In terms of summarising these comments, it is fair to say that there has been a
genuine effort to forge a coterminous working relationship through a voluntary collaborative
management model. Management and elected officials involved have promoted the opportunity
directive and would see the merits in developing a collaborative effort. However, it is also noted
that there have been significant barriers to its growth and development. These are now at a
stage where they are now no longer offering clear value for money and in part threaten
resilience at the local level.  
Page 35

Page 36

Review of Shared Services: An Independent Evaluation 
18
2.82 Although there is a belief that it can work, and should be assessed further, there is also
a strong view that time and resource has been expended to make it work, and this has come
up against challenges which are unlikely to recede. 
2.83 Respondents acknowledge the importance of working together, where there are clear
and obvious mutual benefits. It was also noted that other areas, such as back office, and other
regions, notably neighbouring authorities, may be better placed for future collaborative efforts.
There are also growing regional collaborative networks which are offering cost savings and
efficiencies.
2.84 It is also fair to note that there is a degree of disappointment that an opportunity has
been missed and the shared service approach has not delivered what was originally envisaged. 
Organisational challenges, changes in management, perceived threats over loss of control and
staff cuts and stretched working schedules have all contributed to the model not gaining
significant traction. This has been compounded by the fact that the shared service model never
really got off the ground and was not delivered as set out in the original business case.
2.85 There is no doubting that in many cases much good has come from the shared service
roles, and this can continue. The workload and methods in which posts work across authorities
is inherently challenging, this too has been compounded by changes in organisational
structures which has added a further level of confusion to the shared service drive.  It is clear
that effective working continues to flow from the shared posts and there is a way in which this
can continue in a voluntary and flexible manner. 
2.86 It is not down to a lack of work and effort to make the shared service directive work, it
has simply come up against challenges, and these challenges continue. 
Page 36

Page 37

Review of Shared Services: An Independent Evaluation 
19
3 Consultation Findings – Moving Forward
Introduction 
3.1 The evaluation sought to gain an appreciation of future option, to guide a clear
recommendation on the potential next phase for shared services. The review was charged with
assessing four emerging options, these being: 
• Dissolution and return to original posts within host local authorities;
• Continuation of the collaborative shared management model (status quo);
• Continuation and development of the collaborative shared management model including
looking at remit, scale and scope; and
• Change of operational model in conjunction with review of remit, scale and scope.
3.2 A SWOT of each option is presented as an Appendix to this section, to provide a
summary of the key strengths, weaknesses, opportunities and threats of each option. 
Dissolution 
3.3 It is fair to say that there was not an overwhelming desire for complete dissolution of
the shared service ethos and return to the original model of delivery. There was a general
consensus in retaining a shared service ethos, and this would be expected in the current
budgetary climate, perhaps even more so with the major budget cuts being faced by local and
national governments.  
3.4 However, there were strong views that dissolving the current relationship between IC
and WDC would enable a refreshed approach to any future shared service development. It was
felt that limited benefits have accrued from the existing bilateral relationship, other than initial
front-loaded and modest cost savings. It was felt that post holders were over stretched in the
current set-up, resulting in a failure to deliver the shared resources clearly and equitably across
each authority. 
3.5 The benefits were acknowledged as softer and harder to measure benefits such as
better communication and sharing of best practices. The cost savings were an early benefit,
but modest in comparison to the cost savings been targeted by each authority. The costs of
continuing were also hard to report, but it was acknowledged that the resources were
increasingly over stretched and beginning to be counter-intuitive in relation to their aim of
strengthening local level resilience. 
Page 37

Page 38

Review of Shared Services: An Independent Evaluation 
20
3.6 Overall, an assessment of costs and benefits would have to be considered in
progressing this option. The costs would include reappointing new posts within host authorities;
however, the benefits would be dedicated posts back with host authorities, fulfilling a clear and
measurable role within one organisation. The actual cost is unknown, and the benefits are also
unknown at this stage. It is expected that the costs would be relatively minor in light of the
overall budget cuts being assessed, and the benefits may be considerable in terms of long term
gains through a dedicated resource within each local authority.  The actual costs are unknown
and these would have to be reviewed as part of any future decision on the shared service
agreement, and will also have to take cognisance of TUPE and contractual implications, such
as salary preservation, which may add to the cost, time and service provision implications.
3.7 There were some nuances in this area, notably around Audit/Fraud, where it was felt
there may be merit in considering a Lead (Host) Council model, for this is known to be
successful in other areas and is moving into that sphere in an IC/WDC setting. However, it may
be that WDC and IC consider this separately rather than transition the current voluntary
arrangement into a formal arrangement.  
3.8 The Ground/Fleet/Waste roles have shown progress in terms of a locational resilience
model, and the costs associated with changing this would have to be clarified by each authority.
The Shared Chief Officer / Head of Service post, which was a new post, would be an area
where IC and WDC would need to decide how this post would fit into any new or existing
organisational structure. 
Status Quo 
3.9 This was seen as the least favoured option. This is not an option, ‘do nothing’ cannot
be an option as the current arrangement is not working for each authority. The current
arrangements include an interim post, and the shared services progression has been
mothballed for over a year. The Shared Roads Manager post was progressed but never filled
and there remains differing perceptions over the split of workloads and resources over how
resources are allocated over each authority. 
3.10 Carrying on may have the benefit of sharing ideas and best practice and improved
communication, however, these can all continue through other regional and national fora. There
would be a cost to disentangle, and it would release dedicated posts back into host authorities,
as was the case when the shared roads manager job did not proceed. 
Page 38

Page 39

Review of Shared Services: An Independent Evaluation 
21
Refine 
3.11 This option seeks to refine, and build on the successes and fix any issues with the
current model. There remain concerns how much further shared services can go, as they have
been challenged with Trade Union and staff concerns as well as issues around gaining true
benefits when the back office systems and functions are not integrated.  
3.12 There remain concerns around different terms and conditions, pay grades and work
conditions. The only manner in which this method could be implemented would be for the
original recommendation of a Lead (Host) Council model to be progressed. The relatively small,
and hard to measure, softer benefits achieved to date, over the relative small and modest costs
savings suggest further small refinement is unlikely to unlock any noticeable savings. 
3.13 It is understood Trade Unions and staff remain concerned about further integration.
There has been slow progress to date. There is unlikely to be any major national pressure to
promote shared services, and local authorities are seeking much larger savings than those
achieved through five years of attempting to get local a shared service approach to work.
3.14 Without strategic buy in to make a major shift towards a significant shared service
model, through a Lead (Host) Council, this option remains a longer term option. It is also one
which may transpire with another local authority, or authorities. It is also an area which may be
best placed for back office functions. Due to the current status of the shared services and lack
of progress to date, low level benefits and modest costs savings this option is also ruled out. 
Step Change 
3.15 There was limited views on this option, or ideas as to alternative models, other than
light reference to forming arm’s length organisations, regional skills and resource pools and the
potential of co-operative consultancy for technical and professional service. Interviewees
recognise there are other well-formed models notably Ayrshire Alliance, Tayside Contracts and
Leisure Trusts. However, it was noted that there was no longer a national desire for establishing
new bodies in the current budgetary climate, they are not seen as tax efficient, and do not
present the efficiencies they once offered. 
Page 39

Page 40

Review of Shared Services: An Independent Evaluation 
22
Summary 
3.16 There is no doubting the value that sharing resources and staff can play in addressing
value for money and making savings. These have been modest, and not of the scale as
originally envisaged. The shared service approach is working in certain areas, through sharing
skills, knowledge and best practice, and this should be recognised by all parties. In many cases
this has been achieved through the hard work and skills of those staff in these shared posts.
These posts are increasingly challenging and the current structure does not support their short
to medium sustainability. There are organisational risks should these postholders move into
other positions, or retire.
3.17 There have been concerted efforts to work together, and the fact that the original
recommendation and tripartite nature of the shared service agreement was never taken
forward. There have been challenges to its growth and the inability to make a step change in
facilitating a model which not only make substantial savings but also clearly builds resilience,
these were the aims and these have not been achieved, only in part.
Page 40

Page 41

Review of Shared Services: An Independent Evaluation 
23
4 Findings, Observations and Recommendations 
Key Findings 
4.1 There has been a genuine effort to forge a coterminous working relationship through a
voluntary collaborative management model. Management and elected officials involved have
promoted the opportunity afforded from sharing services and see the merits in developing a
collaborative ethos. However, it is also noted that there have been significant barriers to its
growth and development. These are now at a stage where they are now no longer offering clear
value for money and in part threaten local level resilience.  
4.2 Although there is a belief that it can work, and should be assessed further, there is also
a strong view that time and resource has been expended to make it work, and this has come
up against challenges which are unlikely to recede in the short to medium term.
4.3 The authorities’ desire to share services, as well as national drive for share services,
has somewhat diminished since it was first muted locally in 2015/16.  Respondents
acknowledge the importance of working together, where there are clear and obvious mutual
benefits. It was also noted that other areas, such as back office, and other regions, notably
neighbouring authorities, may be better placed for any future collaborative efforts. There are
also growing regional collaborative networks which are offering opportunities for cost savings
and efficiencies.
4.4 It is also fair to note that there is a degree of disappointment that an opportunity has
been missed and the shared service approach has not delivered what was originally envisaged. 
Organisational challenges, changes in management, perceived threats over loss of control and
staff cuts and over-stretched working schedules have all contributed to the model not gaining
significant traction. 
4.5 This position was compounded by the fact that the shared service model never really
got off the ground, and was not delivered as set out in the original business case.  It has never
truly been a shared service, it has been a limited development of shared posts, governed by a
Joint Committee with a focus on monitoring progress and annual reporting over a limited
number of meetings.  
4.6 In many cases much good has come from the shared service roles, and this can
continue. The workload and method in which shared posts work across authorities is inherently
challenging, this too has been compounded by changes in organisational structures which has
added a further level of confusion to the shared service drive.  Much good work and effective
work practice continues to flow from the shared posts and there is a way in which this can
continue in a voluntary and flexible manner.  
Page 41

Page 42

Review of Shared Services: An Independent Evaluation 
24
4.7 It is not down to a lack of focus and effort to make the shared service directive work, it
has come up against challenges from the start, new challenges, and these challenges continue. 
The good work, and ongoing work of shared posts cannot be undervalued, and a mechanism
can be designed which allows these best practices and communications to continue, and even
expanded. 
4.8 Carrying on as it, is not an option, as is seeking to invest further in its roll-out, as it’s
roll-out to date has stumbled and not gone further than three shared posts, which are now over-
stretched.  The section below summarises views and observations on the best way to proceed
with shared services.
Observations and Recommendations 
4.9 There is no doubting the value that sharing resources and staff can play in addressing
value for money and making savings. These have been modest, and not of the scale as
originally envisaged. The shared service approach is working in certain areas, through sharing
skills, knowledge, experience and best practice, and this should be recognised by all parties.
In many cases this has been achieved through the hard work and skills of those staff in these
shared posts. These posts are increasingly challenged and the current structure does not
support their short to medium sustainability. 
4.10 There have been concerted efforts to work together, and the fact that the original
recommendation and tripartite nature of the shared service agreement was never taken forward
is an inherent weakness. There have been challenges to its growth and the inability to make a
step change in facilitating a model which not only make substantial savings but also clearly
build resilience, these were the aims, and these have not been achieved, only in part.
4.11 The current model is not sustainable, the workloads are too great, and growing, and
the inability to clearly evidence the benefits of the shared posts, and clearly monitor and
evaluate an even split of resource remains a growing challenge. 
4.12 There are opportunities for the lessons learned to shape the work in these shared
areas, the challenges facing many public bodies are significantly more challenging now than
before. Dedicated and skilled workforce in clearly defined roles within each authority will
strengthen the required resilience at a relatively small cost. There remains scope to build on
the voluntary and flexible benefits of sharing best practice and information exchange through
the growing plethora of regional led, sector specific, virtual and physical fora and networks. In
time these may create the correct environment for a new wave of sharing services, resources
and people. 
Page 42

Page 43

Review of Shared Services: An Independent Evaluation 
25
4.13 As set out in the individual SWOT of the options and the recommendations set
out in the report, it is the review’s conclusion that unless there is a political will and a
significant guaranteed step change could be agreed, as outlined in the original proposal,
the shared posts should dissolve back to each host authority. That is not to say it has
been a failure, it can be seen as being a useful exercise to assess the ability of two
authorities to share services and skills. The good work and communications should
continue and both parties can independently seek a manner in which to make savings
through sharing in other areas, with other partners and other collaborative models.
There will be cost implications of dissolving the voluntary collaborative management
model, and these will be borne by each authority and mitigation measures may be
required to avoid any temporal risks to service delivery.
Page 43

Page 44

Review of Shared Services: An Independent Evaluation 
26
Appendix: SWOT Analysis 
Dissolve SWOT
Strengths 
• Reverts posts to focus on local demands and
responsibilities 
• Strengthen resilience through dedicated posts/resources
• Ensures transparent accountability of costs and benefits 
• Avoids confusion over geographic focus of efforts and
resources 
• Eliminates confusion over workloads, and reverts to
manageable workloads focused on local efforts
• Ability to react and respond to local elected members in
a timely and efficient manner
• Reduces duplication between shared services and
parent committee 
• Allows authorities to focus on delivering Best Value at
the local level 
• Provide and consistency on staff contracts, conditions
and pay 
Weaknesses 
• Initial cost implications for each authority 
• Reallocating staff back into host authorities 
• Modest benefits to date could be lost
• Increased duplication as each council will be
required to resource attendance at external
national and regional bodies
• Reduction in resilience ie structures,
flooding
• Loss of sharing skills
• Loss of single point to lead in key areas
such as an Electric Vehicles (EV) strategy
• Reduced ability to increase inhouse delivery,
reliance on buying in skills from private
sector 
Opportunities 
• Enables refreshed approach to Shared Services 
• Build on Shared Service ethos achieved to date, i.e.,
lessons learned
• Seek other Shared Service opportunities, i.e., back
office, front line and other partners/areas 
• Develop informal platforms for sharing best practice
and knowledge 
Threats
• Temporal and short term risk to service
delivery
• Loss of staff, and talent
• Failure to comply with Best Value and Audit
Scotland Reviews 
• Political and policy changes and challenges
• Budget reductions
• Aging demographic /single points of failure 
Page 44

Page 45

Review of Shared Services: An Independent Evaluation 
27
Status Quo SWOT
Strengths 
• Allows continued platform for sharing ideas and best
practice 
• Reduces duplication in effort and resources
• Build on good communications and best practice
sharing to date
• Offers modest cost savings 
• Innovative locality resilience model implemented and
retained
• Service delivery continued throughout challenges, i.e.,
pandemic
• Shared procurement 
• Opportunity to identify shared project lead when
appropriate, i.e., EV Charging Strategy
• Sharing of skills, i.e., risk assessment development,
project delivery, routes to market
• Single attendee to national and regional groups with
sharing of information at local level
• Less reliance on single posts/ points of failure 
Weaknesses 
• Continued confusion and perception
around location of benefits, efforts and
resources
• Continued challenges of perceived
procurement and contractual benefits
• Inequal share of costs and benefits 
• Continuing weakening of local resilience
through work overload
• Lack of political and operational buy in to
develop further
• Challenging geographic locations
• Joint Committees role as record taking
and not decision making function
• No further annual cost savings without
any new shared posts
• Lack of consistent systems (payroll, HR,
legal) overseeing the Shared Service
• Different position on use of technology
etc
• Role profiles do not reflect role remit or
responsibilities
Opportunities 
• Build on existing voluntary model, and opportunities to
expand it to other areas (Back office, front line and
other areas/partners)
• Create cost savings through genuine sharing of
services 
• Rebuild from the start in line with original OBC
• Develop a strategic framework (including KPIS and
PMF) to measure costs and benefits of a shared
service 
• Joint Committee becoming decision making and
reducing duplication, increasing capacity
• Shared approach to policy development 
• Develop skill base to carry out increased activity
rather than outsourcing / buying in external support
Threats
• Continued risks to resilience 
• Continued inequalities, and perceptions
around inequality in benefits 
• Potential loss of benefits as a result of
over exposed posts
• Political and policy changes and
challenges 
• Age profile, workforce planning 
Page 45

Page 46

Review of Shared Services: An Independent Evaluation 
28
Refine SWOT
Strengths 
• Long list of ‘textbook’ benefits set out in original OBC
• Consistent with best practice and Best Value and Audit
Scotland principles 
• Create value for money benefits through genuine
shared services 
• Enhanced resilience through a fair and equal sharing of
resources and staff
• Support national drive for shared services 
• Increased capacity and resilience
• Reduced duplication
• Use of Joint Committee to make decisions
• Retention of Locality Resilience Model
• Retain opportunity to identify 1 lead to represent at
regional and national forums
• Retain opportunity to identify one lead for taking
forward activities such as an EV strategy
Weaknesses 
• Lack of political desire to share services
• Uncertainty of Trade Union buy in to Share
Services
• Lack of a track record of delivering to date
• No desire by authorities to endorse Lead
(Host Council) Model from start
• Not fully delivering on the long list of
potential benefits to date
Opportunities 
• Lessons learned from initial shared service drive
• Seek opportunities with other Departments, authorities
and agencies
• Ability to develop strategy and political drive for genuine
shared services under a Lead (Host) Council Model 
• Closer alignment of terms and conditions to allow for
cross border working
• Refinement of existing governance model with Joint
Committee taking on decision making 
• Sharing of skills, i.e., flooding where there is limited
resource
• Developing skills to deliver more work inhouse rather
than buying in/ outsourcing
Threats
• Unknown staff desire and willingness to buy
in to new model, following its perceived
challenges to date
• Challenging geographical situation
• Political and policy changes and challenges
• Unlikely support from Trade Union buy in to
Share Services 
Page 46

Page 47

Review of Shared Services: An Independent Evaluation 
29
Step Change SWOT
Strengths 
• Create value for money opportunities 
• Arms length from political intervention
• Examples of success elsewhere
• Ability to ‘buy in’ / procure commercial support and
services
• Independence and flexibility/adaptability to fast
changing economy/environment 
• Reduction in duplication
• Increase in capacity
• Alignment of terms and conditions, salaries etc
Weaknesses 
• Untried and untested in local setting
• Other regional partnerships evolving, such
as Clyde level agencies (City Deal) and
partnerships, and potential overlap and
confusion
• Poor geographical situation
• Investment required in IT etc
• Reduction in political accountability 
Opportunities 
• Taxation and other legal benefits from new independent
body
• Other geographies and activity areas may be better
suited and more flexible to become involved 
• Ability to develop dedicated systems for new arms
length body
• Refinement of existing governance model with Joint
Committee taking on decision making 
• Sharing of skills, i.e., flooding where there is limited
resource
• Developing skills to deliver more work inhouse rather
than buying in/ outsourcing
Threats
• Trade Union buy in
• Staff buy in
• Challenging geographical location
• Setting out governance and terms of
reference
• Time taken to align Terms and Conditions 
Page 47