Page 1

Note of Elected Members’ Pre-Application Briefing 
Tuesday, 10 October 2023, Civic Space, Church Street, Dumbarton at 2pm 
Present: Councillors Karen Murray Conaghan, Ian Dickson, Gurpreet
Singh Johal, David McBride, Michelle McGinty, June McKay,
Lawrence O’Neill and Martin Rooney 
Officers Peter Hessett, Chief Executive; Pamela Clifford, Planning,
Building Standards and Environmental Health Manager (Chair);
James McColl, Development Management Team Leader; Alan
Douglas, Chief Officer – Regulation and Regeneration; Gillian
McNamara, Economic Development Manager; Joshua Doyle,
Placemaking Co-ordinator; Michelle Lynn, Assets Coordinator;
Section Head – Litigation (Legal Officer) and Nicola Moorcroft
Committee Officer 
Others  Alan Anthony from ThreeSixty Architecture 
Attending: 
1. Apologies 
Apologies for absence were intimated on behalf of Provost Douglas McAllister
and Councillors; Jim Bollan, Diane Docherty, Craig Edward, Daniel Lennie,
Jonathan McColl, James McElhill, John Millar, Lauren Oxley, Chris Pollock,
Gordon Scanlan, Hazel Sorrell, Clare Steel and Sophie Traynor. 
2. Declarations of Interest 
None. 
3. Mixed Use development - Residential (Class 8, Class 9 and sui generis), 
Class 1A (Retail), Class 3 (Restaurants and cafes),  hot food
takeaways/public houses, Class 4 (Office), Class 10 (Non-residential
institutions) and Class 11 (Leisure) with associated access, landscaping,
outdoor space and public realm works, parking and infrastructure at the
Artizan Centre, 3,7 College Way Dumbarton. 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, providing Members with information in relating to an
application at the site of the Artizan Centre at College Way / High Street,
Dumbarton.
This briefing gives members an opportunity to understand the proposal and
highlight any issues, which they consider the proposal ought to address. The
merits of the proposals were not considered, and no decisions were made at

Page 2

this stage. The agreed procedures and protocol for Elected Member
involvement at the pre-application stage is attached at Appendix 1.
.
a)  Background 
The site is located in Dumbarton Town Centre and comprises a 1970’s built
shopping centre known as the “Artizan Centre”. The site is 2.8 hectares in area
and comprises five two and three storey buildings predominantly in retail use.
Approximately 50% of the retail units are vacant. The site is presently in the
ownership of the Council. The site includes buildings fronting High Street, which
are within the Dumbarton Conservation area. 
Partial demolition of the vacant Artizan units to the rear at Risk Street (including
the former post Office building) will commence later in 2023 and is expected to
take 24 weeks. The substation located within one of the units will be retained for
a period of time following the demolition, and relocated within the next 18 months
as part of the next phase of the redevelopment works. 
The Council received £19.9m from the Levelling Up Fund (LUF) to tackle the
decline of the town centre and deliver three key projects in Dumbarton: Glencairn
House; Connecting Dumbarton and the redevelopment of the Artizan Centre. The
overall LUF programme value including the Council’s £2.2m contribution is
£22.1m. £10.165m has been allocated towards the Artizan Centre to cover
acquisition, part demolition, project developments and consultancy as well as
construction works. The Council must spend all grant funding by the end of the
funding period, 31 March 2025. In the LUF application the Council committed to
delivery of the following outputs for the Artizan centre:
• Enable delivery of 105 total residential units, all of which will be affordable
homes.
• Enable the delivery of a new 4,750m2 Civic Centre as part of the
redevelopment in central location.
• Enhance 730m2 of ground floor retail property.
…
Stakeholder engagement has included two public consultation events undertaken
in 24th August and 28th September 2023 and online public consultation between
24th   August – 9th October 2023. 
b) Site Description 
In the past the site was originally housing for the large industrial population of
Dumbarton set out in narrow ‘rigg’ plot formation along College Street. It also
previously hosted bowling greens along with a Free Church. When the Artizan
Centre was first built in the 1970s, it featured a large town square bounded by
shops, the Denny Theatre and Concorde Community Centre and the Free
Church. The square was built over in the 1990s by further retail buildings, forming the
outdoor shopping mall. Today, the site comprises a mix of occupied and vacant
buildings, car parking, service yards and hard landscaping with a variety of uses
including retail shops, cafés and a dance studio.

Page 3

c) Development Details 
The vision for the site is to deliver a transformative regeneration project that:
• Creates a resilient and thriving place that meets the needs of the wider
community.
• Rebalances uses to provide a more resilient mix and stimulate footfall.
• Consolidates retail, introduces new town centre housing and creates positive
public place. 
Like many town centres across Scotland, Dumbarton must look to ensure its long
term sustainability, as shopping patterns and the retail sector evolves. As such, the
proposed regeneration of the Artizan seeks to introduce a mix of uses, including a
possible health centre and a number of new homes across the site. In addition, the
regeneration will also deliver significant areas of new public realm, including much
needed green space, public space and landscaping. In consolidating retail areas and
introducing supplementary uses, as well as new residents, it is intended that
Dumbarton Town Centre continues to be a thriving and sustainable neighbourhood.
Planning Permission in Principle (PPiP) is sought for a mixed-use development led by
a masterplan approach, illustrating how the site could be developed with the proposed
uses. A phasing plan will be associated with the masterplan, which will demonstrate
how the site may support development coming forward over time. 
In summary, the proposed development includes: 
a. Up to 112 residential units of different types and tenures;
b. Circa 5,000m2 Primary Healthcare facility;
c. Circa 2,800m2 of active ground floor use within retained buildings of retail,
restaurants, cafes, hot food takeaways/public houses, Office use and Leisure
uses;
d. Circa 1,700m2 of first floor use within retained buildings of retail, office and
leisure uses;
e. Circe 350m2 of active ground floor use within new buildings of retail,
restaurants and cafes, hot food takeaways/public houses, Office, Leisure
uses;
f. Creation of car parking of 80 spaces and  internal access roads; and 
g. Creation of new Public Square with hard and soft landscaping spaces and
pedestrian routes.   
d)   Planning Policies 
The site is partly within the ‘Clyde Mission’ area, with National Planning Framework
4. 
National Planning Framework (NPF4) –NPF4 does not contain any site-specific
policies for West Dunbartonshire. However, part of the Artizan Centre site does fall
within the Clyde Mission National Development area identified as one of eighteen
National Developments. It recognises that significant land assets are underutilised
across the Clyde, and that longstanding inequality, in relation to poor environment
and health outcomes, require to be tackled as a national priority. The Clyde Mission

Page 4

designation aims to repurpose and reinvigorate vacant and derelict land as well as
adapting the area to the impacts of climate change, where nature-based solutions
would be particularly supported. 
Mixed-use redevelopment of the Artizan centre site would be in keeping with the
Clyde Mission National Development. In addition, many of the general policies of
NPF4 would be supportive in principle of the redevelopment of the site for mixed
uses including Policy 9 (Brownfield, vacant and derelict land and empty buildings),
Policy 15 (Local Living and 20 minute Neighbourhoods), and Policy 27 (City, town,
local and commercial centres). Policy 16 (Quality homes) sets criteria for the
development of homes on sites not allocated in the development plan for that
purpose (which is the case for the Artizan Centre). 
Flexibility in applying these criteria would be required when assessing any proposal
for housing on the Artizan Centre site, and Policy 27 offers specific support for town
centre living. 
Policy 7 refers to the protection and enhancement of valued historic assets and
places in terms of affecting the character of listed buildings and Conservation
Areas.   
Adopted Local Plan (2010) – the Artizan Centre sits within the identified town
centre boundary, where there is support for new retail, commercial leisure, cultural
and public service developments. Land to the north of the centre (north of St Mary’s
Way, GD2 (18)) is identified as a redevelopment opportunity for
retail/business/ancillary parking. Land to the west of the centre (the car park, RET4
(6)) is identified for additional retail floor space. The Artizan centre forms part of the
retail core in the adopted plan, where there is a presumption against change of use
from retail. 
The Dumbarton Town Centre Conservation Area post-dates the Local Plan so there
is no reference in the Adopted Local Plan. 
Proposed Local Development Plan (LDP2, as modified, 2020) – the Artizan
Centre sits within the identified town centre boundary. The Development Strategy
for the town centre supports mixed-use development and improvements to the
Artizan Centre. Dumbarton Policy 1 supports a more diverse and vibrant town
centre and encourages a range of uses, where these accord with Policy SC2.
Policy SC2 identifies core town centre areas (Artizan sits within this) and supports
use classes 1, 2, 3, 7, 11 (shops, financial/professional services, restaurants and
cafes, hotels and hostels, and assembly and leisure) and public houses. Policies
BE2 and BE3 protect Listed Buildings and Conservation Areas. 
Depending on the actual mix of uses, proposed, other policies from each of the
plans could apply. Also, each of the plans contain general policies relating to
matters such as flooding, design, sustainability, accessibility, biodiversity, etc. that
will also be applicable. For example, it is known that the Artizan Centre is in an area
at risk of flooding, and each of the plans have policies relating to this (for example
Policy 22 in NPF4 on Flood risk and water management). Different uses have
different sensitivity to flooding, meaning some uses might be acceptable in a
particular area, whilst others are not.

Page 5

Revised urban strategy (2014) – the Artizan Centre is identified as a Large Project.
The strategy identifies the Artizan Centre as having a negative impact on parts of the
town centre and states the Council will support incremental change or radical
redevelopment. Main uses in this area (including introduction of a traditional grid
pattern to area to north) would be retail, office, some residential, leisure, food and
drink and other appropriate town centre uses. Design guidance is provided. This
shows development blocks to east and west of College Way, with northern block
removed. 
e) Main Issues 
The main issues requiring to be addressed by the planning permission in principle
application will include the following: 
Placemaking and Design Principles:   The mixed-use redevelopment is being led by
a masterplan approach. Placemaking ambitions should be embedded into the
proposals, which in turn will inform the masterplan layout as it evolves. The layout and
architecture of the new development should ensure it maximises and takes advantage
of its town centre location and the Conservation Area, deliver multi-functional green
infrastructure spaces and biodiversity enhancements as well as harness opportunities
for active travel.  Dumbarton has a rich history and this should be reflected in the
design and form of development to create a future-proof high quality development in
the heart of Dumbarton Town Centre.   
Masterplan: The masterplan approach provides a structured approach to how the site
will be taken forward and developed in the future. It demonstrates the specific areas
for the particular uses as well as identifying the specific requirements for active travel,
green space and biodiversity. Any future applications for Approval of Matters Specified
in Condition (detailed) will require to be guided by the agreed masterplan, which would
bring economic, social and environmental benefits to the local area. 
Proposed uses: The adopted Local Plan (2010) and Proposed Local Development
Plan (LDP2, 2020, but prepared in 2018), predate the COVID pandemic and the
significant changes to the future of town centres that were accelerated during this
period. These plans predicted a continued retail focus for the Artizan Centre, which is
now, similar to many other town centres, less viable. The most current part of the
Development Plan (NPF4) supports a more mixed use future for town centres,
including town centre living. Neither the Adopted Local Plan nor Proposed LDP2
envisioned residential development on the Artizan Centre, meaning its development
for residential purposes does raise some conflict with NPF4, which sets criteria for
residential development on unallocated sites. However, it is considered that this is a
matter of timing, and that in principle support does exist for residential development.   
Relationship with adjacent uses: The massing of the new buildings should
respond to the context of adjacent buildings, as well as define key routes and spaces
within the site.  Part of the site fronting High Street is within the Dumbarton Town
Centre Conservation Area and therefore any new development should be in keeping
with the character of the Conservation Area and adjacent listed buildings in terms of
massing, scale, design and materials. New development should add to, strengthen
the Conservation Area status, and act as a catalyst for further development in the

Page 6

town centre and support long-term town centre regeneration. 
Proximity of Mixed Uses:  In order to deliver a mix of uses on the site, the design
proposal must carefully consider the proximity of different uses, ensuring public
routes and spaces are activated by relevant uses at ground floor, whilst also
ensuring that the privacy of new homes and future residents is maintained at all
times. The introduction of defensible space, as well as maintaining legible pedestrian
routes through the site to manage these relationships has been encouraged.   
Phasing: Critical to the delivery of any masterplan is ensuring that phasing
strategies are considered at this early stage, to manage practical delivery, but also
reduce the impact on existing businesses. Unlike many masterplans, which deliver
building forms first, with landscape being the final phase, the proposal seeks to place
the new areas of landscape and public realm as the initial priority for phase one. In
doing so, residents should start to benefit from the redevelopment at the earliest
possible time, with new areas of high quality landscape to enjoy, as well as improved
pedestrian routes through the site and wider town centre. 
Accessibility and Parking:  The site is highly accessible with good connections to
the other parts of the town centre, bus stops and the train station. The
redevelopment should encourage use of more sustainable modes of transport such
as walking and cycling. The historic north-south route that previously existed on the
site would be reinstated. This supports greater pedestrian connection to Dumbarton
Station, as well as providing opportunities for large areas of public realm.  There are
a number of town centre car parks in close proximity to the site together with the
provision of 80 spaces within the site. 
Green Infrastructure and Public Realm:  The new development should
demonstrate that landscape character, fabric and amenity have been carefully
considered and guide future development of the site in terms of creating a quality
place with character. The new areas of public realm should have a positive sense of
enclosure, which is critical for such spaces as well as providing opportunities for
recreating a modern town square in the heart of the town centre.   
Community and Economic Benefits: Consideration should be given to the wider
community and economic benefits it brings to the local area in terms of creating jobs
for local people and providing wider health and wellbeing benefits. Local people will
benefit from these facilities as well as it will attract visitors and tourists to the Town
Centre and wider area. 
Flooding: The entirety of the site is within the SEPA future coastal flood risk area
(accounting for climate change).  NPF4 places a higher threshold on flood risk than
previously was the case.  For Dumbarton town centre this an increased coastal flood
risk level of 85cm by 2100.  Previous areas at risk of coastal flooding were those
below 4.41m.  Post NPF4 this now extends to areas below 5.26m. A further
freeboard allowance of 60cm is required for the finished floor level of new buildings.
This presents a significant challenge to the Artizan project.  Whilst residential can be
built above these levels with basement parking, safe access and egress needs to be
maintained.  
At present the phasing of the development would potentially create ‘islands of

Page 7

development’ which are unacceptable under Policy 22 of NPF4 and continuing
discussions are taking place with SEPA and the Scottish Government to agree a
solution and a way forward for the development. 
Contamination – As with any brownfield redevelopment site, matters relating to
possible ground contamination will require to be addressed. A Site Investigation will
require to be carried out and this together with the wider development proposals will
be considered by the Council’s Environmental Health team in terms of the scope of
work and information required to be submitted with the planning application. This
engagement has already commenced during the pre-application stage. 
f. Next Steps 
All Elected Members will be invited to attend a presentation on the proposals by
members of the design team, and to participate in a subsequent discussion. 
Following this pre-application meeting, the applicant intends to finalise their
planning application for submission and address any comments received during this
meeting. 
On receipt of any such application, it will be advertised in the press, weekly list and
the Council website to allow the public to view the plans and make representation.
The application would then be presented to Planning Committee and Council for
consideration and determination in due course. 
Meeting closed at 3.15 p.m.