WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 14th June 2023
_____________________________________________________________
DC22/156/FUL: Relocation and reconfiguration of current car parking
area, new employee vehicular entry and exit access
routes from existing roundabout, relocated on-site lorry
parking, rerouted internal access roads and associated
works at Kilmalid, Stirling Road, Dumbarton by Chivas
Brothers Ltd.
1. REASON FOR REPORT
1.1 The planning application is a major development as set out in the Schedule
to the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009 and under the terms of the approved Scheme of
Delegation, it therefore requires to be determined by the Planning
Committee. 
2. RECOMMENDATION
2.1 That the Committee indicate that it is Minded to Grant subject to the
conditions set out in Section 9 and delegate authority to the Planning,
Building Standards and Environmental Health Manager to issue the
decision following the satisfactory conclusion of the referral of the planning
application to the Scottish Ministers. 
3. DEVELOPMENT DETAILS
3.1  The application relates to the Chivas Brothers’ spirit vatting and bottling
plant at Kilmalid, situated at the south end of the Vale of Leven Industrial
Estate, Dumbarton. The existing Kilmalid plant was first approved in 1974
and has been subject to significant modernisation and enlargement over the
years. The Kilmalid site currently occupies an area of 13.8 hectares. The
original bottling hall, Clyde Hall, was constructed around 1978 with a further
bottling hall, Leven Hall, added to the site in 2000. A third bottling hall,
Balloch Hall, was added in 2019 to facilitate the relocation of a bottling
facility from a site in Paisley. In addition to the three bottling halls, a variety
of other facilities make up the wider site including disgorging and filling
operations; a blend centre; cased goods storage; offices; lorry parking and
barrel storage. Current access to the site is from the Lionsgate Roundabout
at the entrance to the Vale of Leven Industrial Estate. Although there are
ITEM 5c

Page 2

other industrial units nearby (including the Aggreko factory), the site is
largely surrounded by greenfield land. To the north east, the plant borders
the industrial estate access road but is set back from it behind parkland,
while to the south it borders open fields. To the west the site backs onto
low-lying areas of woodland and scrub along the east bank of the River
Leven. The application site itself, sits to the south of the existing Kilmalid
plant with a spur reaching south east to the existing Stag roundabout. 
3.2 Currently there is only a single point of access and egress to the Kilmalid
site with this being taken from the Lionsgate Roundabout on Stirling Road.
Another access route to the north of the site was approved in October 2022
(planning application DC20/128), but to date, this access has not been
constructed.  The existing access caters for all raw material deliveries,
finished goods distribution, spirit tanker delivers, barrel deliveries, employee
vehicles and employee pedestrian routes. 
3.3 In order to address a variety of operational challenges at the site associated
with staff, HGV and other vehicles accessing, moving around and parking
within the site, a number of proposals are being brought forward. These
include: 
• The formation of a secondary employee access from the Stag
Roundabout on the A813, inclusive of bridge over the Murroch Burn,
to a reconfigured employee carpark on the southern side of the
facility which will allow for the creation of an additional 60 parking
spaces within the site.
• Improved pedestrian and cycle routes to the site from the Stag
Roundabout via Lomondgate Roundabout on the A82 underpass to
Dumbarton.
• Formation of new lorry parking area.
• Creation of a feature entrance gateway north of the Murroch Burn to
access the site via the new road from the south.
• Creation of a new open landscaped pedestrian plaza from the head
of the new access road and car park entrance to the pedestrian
entrance to the site on the southern boundary.
• Creation of a bus turning and drop off area to the top of the new
access road and connecting with the pedestrian links to the new
entrance plaza.
• Localised diversion of the core path to the southern site boundary
and a resurfacing of the core path with a hard wearing finish to a
width of 3 metres. Comprehensive soft landscaping across the new
development site including new tree and hedgerow planting and
planting to the entrance plaza area. Improved site wide soft and hard
landscaping.

Page 3

• The existing gatehouse and adjacent Lionsgate Roundabout
dedicated to commercial vehicles only following construction of the
new southern access road.
3.4 In recent years there have been a number of planning applications granted
permission for the site. Most significantly was the third bottling hall granted
in planning permission in 2017 (ref: DC17/129) inclusive of delivery, storage
and dispatch areas and associated administration and support facilities,
along with external barrel storage area, delivery roads and parking for
HGVs, additional staff parking, landscaping and SUDS drainage scheme.
The new bottling facility relocated operations from a bottling site in Paisley
to Kilmalid.  An additional car park providing 138 spaces to the east of the
site (ref: DC21/057/FUL) and a new northern access road and security
gatehouse (ref: DC20/128) which amends the arrangement approved as
part of the bottling hall application were both granted in 2022.  The car park
is currently under construction but the new northern access has not been
taken forward at this time.
4. CONSULTATIONS
4.1 Scottish Environmental Protection Agency initially submitted a holding
objection to the proposal due to their being a lack of information on flood
risk grounds. Additional details were subsequently provided by the applicant
and SEPA confirm that they are broadly in agreement with the assessment
of flood risk and the proposed mitigation. SEPA highlight that Policy 22 of
NPF4 promotes a precautionary approach to flooding by avoiding new
development in areas at risk of flooding.  The proposal involves a new road
across an area of land that falls within the definition of a flood risk area
described above. SEPA advise that the Planning Authority are best placed
to determine the acceptability of the proposals in accordance with the
overall policy framework in NPF4. Therefore, if the Council is satisfied the
requirements have been met, then SEPA can offer no objection to this
planning application on the grounds of flood risk. However, if it is determined
the requirements are not met and the proposal does not meet the
exceptions defined in Policy 22, then based on the site specifics SEPA’s
position should be considered as an objection relating to the access road
through the flood risk area. The development proposals do not meet the
exceptions defined in Policy 22, therefore SEPA object to the application.
This is discussed further in Section 7 of the report. 
4.2 West Dunbartonshire Council Environmental Health Service have no
objections subject to conditions relating to addressing contaminated land
matters and hours of construction work. 
4.3 West Dunbartonshire Council Roads Service have no objections in relation
to both roads and flooding matters.

Page 4

4.4 West of Scotland Archaeological Service (WoSAS) advise that a condition
requiring a written scheme of investigation in relation to a programme of
archaeological works to be submitted and approved prior to any
development on site should be attached to any planning permission
granted. 
4.5 West Dunbartonshire Council Biodiversity Officer advises that the Habitat
Survey is acceptable although some points are highlighted in respect of
additional species and mitigation. The requirement for biodiversity
enhancement is highlighted as is the requirement to understand the current
biodiversity potential baseline. 
4.6 Scottish Water and SP Energy Networks have no objections to the
application.
5. REPRESENTATIONS
5.1 None received.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
6.1 National Planning Framework 4 (NPF4) was adopted by the Scottish
Ministers on 13th of February 2023 and now forms part of the Development
Plan. NPF4 recognises the importance of the whisky industry as part of the
food and drink sector and the significant contribution this brings to the
economy. However, this general support for the whisky industry requires to
be considered in the wider policy context of NPF4.
6.2 Policy 1 relates to tackling the climate and nature crises and states that
when considering all development proposals significant weight will be given
to the global climate and nature crises. Policy 2 also relates to the climate
in the form of climate mitigation and adaptation and states development
proposals will be sited and designed to minimise lifecycle greenhouse gas
emissions as far as possible and development proposals will be sited and
designed to adapt to current and future risks from climate change. Policy 3
states that proposals for major development will only be supported where it
can be demonstrated that the proposal will conserve, restore and enhance
biodiversity, including nature networks so they are in a demonstrably better
state than without intervention. The proposal is for the reconfiguration of
infrastructure associated with an existing development. Whilst there are
proposed changes to parking, the level of traffic movements associated to
the bottling facility are not predicted to increase. It is considered that an
enhancement of biodiversity beyond the current baseline can be achieved
with proposed tree planting, landscaping and other features. Features such

Page 5

as electric vehicle charging points are also provided.  The proposal has
considered both climate change and biodiversity in accordance with the
policies. There will be no unacceptable impact on existing ecology and thus
no conflict with Policy 4, which seeks to protect the natural environment
including designated sites and protected species.
6.3 Policy 5 relates to Soils. Development proposals on prime agricultural land,
or land of lesser quality that is culturally or locally important for primary use,
as identified in the Local Development Plan, will only be supported in certain
circumstances as listed in the policy. Whilst the land has been used for
agriculture previously, Scotland’s Soils map classifies the lands as Class
4.2, which is not “prime” agricultural land and does not include any peatland
habitat or carbon rich soils. As such the development is in accordance with
Policy 5. 
6.4 Development proposals that enhance, expand and improve woodland and
tree cover will be supported in accordance with Policy 6. There are no areas
of protected woodland or trees which are subject to a Tree Preservation
Order within the site boundary. However  a tree report has been submitted
in support of the planning application and it identifies 206 trees within the
site, 7 of which are classed as “A” high quality, 53 are “B” moderate quality,
122 are “C” low quality and 24 are “U” and unsuitable for retention on the
basis of condition. The proposals retain trees as far as possible, and whilst
some tree removal is proposed the majority of trees are to be retained and
protected, and those that are identified for removal are of generally lower
quality in terms of the survey findings. A total of 41 trees are proposed for
removal, with one of these being Category A. The proposal includes new
tree planting throughout the site with a total of 93 new trees planned and it
is considered that the proposal will increase tree cover and is in accordance
with the Policy. There is no impact upon historic assets and therefore no
conflict with Policy 7.
6.5 Policy 8 supports development within the green belt in a limited number of
circumstances. The proposal crosses a section of designated green belt
land which runs along the Murroch Burn. It is considered that the
development type is not covered by any of the circumstances covered in
Policy 8, however, this section of green belt is however between two areas
identified as industrial land within the adopted Local Plan and proposed
Local Development Plan 2. The part of the development which crosses the
green belt is the new access road. Whilst the road will have a low impact on
the green belt, the proposals encroachment within the green belt is contrary
to Policy 8 of the NPF4.  This is considered further in Section 7 below which
assesses the proposal in the context of all material considerations.  
6.6 Policy 13 seeks to encourage, promote and facilitate developments that
prioritise walking, wheeling, cycling and public transport for everyday travel

Page 6

and reduce the need to travel unsustainably. Whilst the proposal relates to
an existing site and whilst the proposal does not increase floorspace or the
wider transport demands of the site, it remains that the location of the site
together with the shift pattern do not lend themselves to a sustainable travel
arrangement with employee travel dominated by the private car. Whilst the
proposal seeks to resolve operational issues with access and parking within
the site, the provision of additional parking, combined with previous
additional parking granted planning permission will not seek to encourage
a modal shift away from the private car. A travel plan associated with the
planning permission for the bottling facility has sought to address this issue
but has not avoided the need for additional parking as is now proposed.
The applicant encourages car sharing, provide a cycle to work scheme,
have and are expanding EV charging infrastructure and cycle shelters
across the site. The supporting documents also note that proposals for a
shuttle bus service between the site and public transport nodes (for example
the railway station) are being progressed. It is also proposed to increase the
width of the core path. The approach set out above together with a full
review of the site Travel Plan which can be addressed by condition will
ensure efforts to support sustainable travel and encourage a shift away from
the private car are maximised. With such an approach, the proposal can be
considered acceptable with reference to Policy 13.
6.7 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale as per Policy 14.
The proposal to reconfigure the vehicle access and car parking
arrangements will improve the quality of the area by improving the safety of
those using the area, particularly pedestrians. 
6.8 Policy 20 relates to blue and green infrastructure. Development proposals
for or incorporating new or enhanced blue and/or green infrastructure will
be supported. The application seeks to amend the route of, and resurface
a core path. The core path alters slightly in its alignment, however will be
upgraded in terms of its width, to 3m and its surface. This is considered an
enhancement of green infrastructure, in accordance with the Policy.
6.9 Flood risk and water management is covered in Policy 22. Development
proposals at risk of flooding or in a flood risk area will only be supported
under certain circumstances. The proposal involves a new road across an
area of land that falls within the definition of a flood risk area. However,
Policy 22 (a) does indicate development proposals in a flood risk area will
be supported if they are for ‘(i) essential infrastructure where the location is
required for operational reasons’. The Council has concluded that the
proposal is not essential infrastructure as defined by NPF4 and not
supported by part (a) of Policy 22 of NPF4. Notwithstanding this, all risks of
flooding are understood and addressed, there is no reduction in floodplain
capacity or increased flood risk, and the development will remain safe and

Page 7

operational during flood events with alternative accesses. However, as
discussed further in Section 7 below, the proposal is contrary to Policy 22. 
6.10 Policy 26 supports proposals for business and industry on sites allocated
for those uses in Local Development Plans. Policy 26 also gives support for
business and industry uses which are compatible with the primary function
of the area as well as other employment uses which do not prejudice the
primary function of the area and are compatible with the business/industrial
character of the area. A large proportion of the site is designated within the
Council’s proposed Local Development Plan 2 as a business and industry
opportunity. Therefore, the proposal for infrastructure associated with
bottling facility is considered to be in accordance with the Policy. 
6.11 Overall, the proposal is considered to be contrary to aspects of both Policy
8 and Policy 22 of NPF4, relating to the encroachment on the green belt
and flooding respectively. Having fully assessed all material planning
considerations as set out in Section 7 below, the benefits of further inward
investment which supports an important local employer within a key
industry, and addressing various operational issues that are identified at the
site outweigh that the proposal is not one which is specifically supported by
Policies 8 and 22 of NPF4.  
West Dunbartonshire Adopted Local Plan 2010 
6.12 Policy GB1 presumes against development within the green belt with a
limited number of exceptions. It is considered that the development type is
not covered by any of the circumstances covered in Policy GB1. Whilst the
new access road crossing the green belt will have a low impact, the
proposals encroachment within the green belt is contrary to Policy GB1.
6.13 Policy GD1 requires all new development to be of a high quality of design
and to respect the character and amenity of the area in which it is located.
The proposal will have limited visual impact in association with the existing
industrial setting of the existing operational plant. Whilst the new access
road crosses undeveloped land the impact of the road and bridge over the
Burn within the surrounding landscape will be limited. 
6.14 Much of the site is designated as LE1 (15). Policy LE1 sets “a presumption
in favour of uses which positively extend the permanent employment
potential of the sites” with this designation. It also safeguards the sites for
industrial and business uses only (use classes 4, 5 and 6), with the preferred
uses listed in Schedule LE1. Schedule LE1 indicates that the site is
safeguarded for the expansion of the adjacent unit, and that all of classes
4, 5 and 6 are preferred. Policy LE1A reserves the site for accommodating
the potential expansion of the processes associated with the Kilmalid
operational plant and shall be used for no other purposes. The site is being

Page 8

used for the expansion of the infrastructure of the Kilmalid operational plant
and as such is in accordance with the policies. 
6.15 Site access to the main development site is taken via the Kilmalid
Specialised Economic Development Site (now referred to as Lomondgate)
and policy LE5 applies. This site is designated for industry and business
uses and other uses that positively extend the permanent employment
potential of the site. The proposal is for alterations to access and
infrastructure that will allow the Kilmalid bottling facility to function more
efficiently and as such it is considered that this will positively extend the
permanent employment potential of the site in accordance with the policy. 
6.16 Policy LE6 identifies the Vale of Leven Industrial Estate, including the
development site, as a Strategic Industrial and Business Location. It is to be
safeguarded for economic development uses and there shall be a strong
presumption against uses other than for business and industry. Again,
whilst the development itself is for infrastructure rather than a new industrial
of business unit, it is associated with, and adds to the function of the Kilmalid
bottling facility and as such aids with economic development. 
6.17 Policy T1 states that the Council supports measures to provide sustainable
transport modes including footpaths, cycle routes and improved access to
public transport. The policy goes on to state that this is particularly in respect
of employment areas. Policy T4 requires developers to ensure that sites are
well integrated into walking, cycling and public transport routes and give
priority to the positioning of footpaths, cycleways and bus stops at the main
entrances to developments. As stated above, the plant benefits from access
to bus connections and the cycle provisions are intended to increase. The
applicants encourage car sharing, provide a cycle to work scheme, have
and are expanding EV charging infrastructure and cycle shelters across the
site. Subject to a review of the wider travel plan brought forward for the site
following the granting of permission for the new bottling hall, the proposal is
considered to accord with Policy T1 and T4. 
6.18  Policy E1 states that in exercising its planning function the Council will
further the conservation of biodiversity. Policy E5 states new development
proposed on sites with, or adjacent to, existing trees or woodlands will be
assessed in accordance with best practice. Whilst trees are being removed
from the site in order to facilitate the development, more trees are being
proposed to be planted than removed.
6.19 Policies F1, F2 and F3 address flooding, drainage and flood protection. The
proposal is considered to be contrary to Policies F1 and F3 owing to the
development encroaching into an area identified as being at risk of flooding
on the site. Matters relating to archaeology can be satisfactorily addressed
to ensure no conflict with Policy BE5.

Page 9

6.20 Overall, the proposal is supported or has no conflict with many policies of
the adopted Local Plan. However, it is considered to be contrary to Policies
GB1, F1 and F3 with regards to the encroachment into the Green Belt and
flood risk area respectively.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local
Development Plan 2 (LDP2), incorporating the recommended modifications
of the Examination Report received on 22 April 2020, which were accepted
by the Planning Committee of 19 August 2020, remains the Council’s most
up to date spatial strategy and is therefore afforded significant weight in the
assessment and determination of planning applications, subject to
compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material
consideration.
7.2 Vale of Leven Industrial Estate Policy 1 supports Class 5 and 6 employment
uses within the industrial estate. Lomondgate Policy 1 states that within the
Lomondgate Business Park proposals will only be acceptable if they meet
the certain criteria including: a masterplan for the site has been developed;
at least 50% of the site is developed for Class 4, 5 & 6 development;
successful integration of development within the landscape; requirement for
access and route improvements and active travel connections to maximise
access to employment opportunities. Whilst the proposal is not for a new
building, it does support an existing employment use and does improve
travel connections. Whilst no updated masterplan has been produced, the
impact of the proposed development on the site is the inclusion of a new
access road, which does not significantly impact on remaining development
land. The proposed access road forms a continuation of the existing road to
the south west of the Aggreko building.  As it travels north over the Murroch
Burn, it is also landscaped to an acceptable standard. 
7.3 Policy GB1 restricts development in the green belt to a limited number of
circumstances. It is considered that the development type is not covered by
any of the circumstances covered in Policy GB1. Whilst the new access
road crossing the green belt will have a low impact, the proposals
encroachment within the green belt is contrary to Policy GB1.
7.4 Policy E1 directs proposals for business industrial, or storage and
distribution uses to the sites listed in Schedule 4. Schedule 4 includes this
site as E1(12), indicating that Use Classes 4, 5 and 6 are acceptable, and
reserving this site for expansion of the Chivas Bottling facility. The proposed

Page 10

development is associated with the Chivas bottling facility and as discussed
in detail in Section 7 below, is considered to accord with this policy. Policy
E2 sets out the criteria which are require to be demonstrated for alternative
uses on industrial and business sites. This is not considered an alternative
use as it supports an existing industrial use. 
7.5 Policy ENV5 seeks to protect the quality and enjoyment of the water
environment. The proposed development is not considered to have an
unacceptable impact on the water quality or environment. Policy ENV6
states that development which would have a significant probability of being
affected by flooding or increase the probability of flooding elsewhere will not
be accepted. Owing to the development encroaching into an area identified
as being at risk of flooding on the site, the proposal is thus contrary to Policy
ENV6. Developers will be required to establish the nature of any
contamination on any potential development site in accordance with Policy
ENV9. Appropriate conditions can ensure compliance with policy ENV9.
7.6 Development proposals are required to prioritise active travel, by
incorporating new, and providing links to, existing footpaths, cycle routes
and public transport routes in accordance with Policy CON1. This policy also
requires electrical charging points to be provided within major business and
industrial developments. Although the development cannot be said to
prioritise active travel, it does improve active travel connections to the site
and incorporates electric vehicle charging points. Policy CON3 requires
proposals to avoid adversely impacting on core paths or to provide
mitigation to overcome any such impacts. Whilst there is an impact on the
core path, an appropriate localised diversion is proposed within the site and
the proposal is not considered to adversely impact upon the core path.
Moreover, the applicant further proposes new surfacing to other, undiverted
sections of the path.  
7.7 No concerns arise regarding the impact on the adjacent listed building and
there is thus no conflict with Policy BE2 and matters relating to archaeology
can be satisfactorily addressed to ensure no conflict with Policy BE1. Policy
ENV1 states all new development should enhance biodiversity as part of
the green network. The proposal includes biodiversity mitigation and
enhancement measures and the requirement to further consider what
enhancement could be achieved can be addressed by condition. Policy CP1
requires new development to take a design led approach to creating
sustainable places which puts the needs of people first and demonstrate the
six qualities of successful places. The proposal segregates pedestrians
from HGV routes together with creating a new entrance point and high
quality arrival plaza which again segregates the pedestrian entrance from
the wider car park. Such approaches contribute to the six qualities of
successful places. Policy CP2 requires all development to demonstrate that

Page 11

green infrastructure has been integrated into the design approach from the
outset.
7.8 Overall, the proposal is supported or has no conflict with many policies of
proposed Local Development Plan 2. However, it is considered to be
contrary to Policies GB1 and ENV6 with regards to the encroachment into
the Green Belt and flood risk area respectively.
Green Network and Green Infrastructure Planning Guidance (2022) and
Creating Places Planning Guidance (2022)
7.9 The Green Network and Green Infrastructure Planning Guidance indicates
that “New build commercial and industrial developments should comply with
the principles of good design set out in Policies CP1 and CP2 of Local
Development Plan 2 and the Creating Places Planning Guidance, and look
for opportunities to provide amenity space, access links, SuDS and
enhance biodiversity through planting.” The proposal creates access links,
an attractive pedestrian entry plaza with associated landscaping, utilises
SuDS and seeks to enhance biodiversity. The principle of this approach
complies with the guidance. Regarding the Creating Places Planning
Guidance, whilst there are no new buildings created by the development,
the proposal is considered to be in accordance with the relevant
considerations set out in the Setting and Green Infrastructure sections.
Principle of Development and impact on the Green Belt
7.10 The Kilmalid plant is an important local employer, and the food and drink
industry is a strategically important business sector within the area. The site
employs around 950 permanent employees with a further 200 temporary
staff. The majority of the application site is allocated in the adopted and
proposed plans for industrial use, and the principle of a development
relating to the continued operation of the site is supported in principle by the
relevant policies of NPF4 together with the adopted Local Plan and
proposed Local Development Plan 2. 
7.11 The proposal site is within a Strategic Economic Investment Location (SEIL)
and the majority of the site is within an area specifically designated for
Business and Industrial use, and reserved for expansion of the operations
at the adjacent plant. Whilst the proposal does not result in an increase in
business and industrial floorspace related to Use Classes 4, 5 or 6 as per
the development plan allocation, it is clear from the applicant’s supporting
documents that the development is intrinsically linked to the operation of the
existing plant and on completion will become part of a wider Class 5
industrial site. It is further recognised that the site of the wider Facility has
undergone significant internal investment and reconfiguration in recent
years, including the construction of a new bottling hall on an alternative site
to that identified in the adopted Local Plan or proposed Local Development
Plan 2. Whilst the site has thus expanded, it has not resulted in built

Page 12

development on the proposal site as envisaged by the development plan.
This means that the use of the reserved expansion site for the current
car/lorry park proposal rather than for further industrial floorspace is the
preference of the site operator. 
7.12  In further considering the principle of development, the development
proposal takes access from, and uses land within the Lomondgate area for
the new access road. This area is separately reserved for business and
industry. The adopted Local Plan and proposed Local Development Plan 2
set criteria for the alternative uses of this land which the proposal should be
assessed against. The applicant highlights that the proposals are clearly
linked to the operational enhancement of an existing and established
industrial use, and it follows that they cannot be accommodated on an
alternative site to achieve the same objective. It is accepted that the
applicant has demonstrated a specific locational need with no suitable
alternative locations. The access road is located to minimise impact on the
remaining industrial and business land and the provision of the access road
is not considered to adversely impact on the potential attractiveness of the
Lomondgate location for future business and development. Moreover, the
development may provide a catalyst for future investment in the wider
industrial allocated sites. Whilst an updated masterplan for the wider
Lomondgate site has not been provided in relation to this development, it is
not considered that the provision of the access road will compromise the
ability to secure and deliver the development of the wider site in the future. 
7.13 However, notwithstanding this, the proposal inclusive of access road will
extend the site into the green belt as defined by both the adopted Local Plan
and proposed Local Development Plan 2. Policy 8 of NPF4 sets out the up-
to-date development plan position in respect of development proposals
within the green belt, advising that such proposals will only be supported in
certain circumstances. Whilst the applicant argues that the proposal would
result in the intensification of an established use, the established use is not
in itself within the green belt nor is the proposal connected with intensifying
the overall use of the plant. In anycase it is not the intent of the Policy to
facilitate the expansion of existing sites where they encroach on the green
belt. 
7.14 Policy 8 goes on to set out that additionally, development proposals
affecting the Green Belt require to provide the reasons as to why the Green
Belt location is essential and cannot be accommodated on an alternative
site, that the purpose of the Green Belt is not undermined, the proposal is
compatible with established landscape character and the proposal
minimises visual impact. In the supporting documentation, the applicant has
set out that since the site was first developed, many factors relating to
access and egress, volume of vehicle movements, security and quality
controls have evolved. Whilst the gatehouse still serves as a primary

Page 13

security function, it no longer provides the “sense of arrival” to the site that
it had when it was initially installed. The proposal is being brought forward
to address established operational challenges associated with staff, HGV
and other vehicles accessing, moving around and parking within the site.
The proposals will reconfigure the access, parking and vehicle circulation
routes to separate staff vehicles and HGVs and thus reducing the potential
for interaction between pedestrians, staff and HGVs. It is also identified by
the applicant that at particular times of the day, most notably during shift
changes, congestion can occur with vehicles in the site and spill out to the
A813. As noted in para 7.11 above, the applicant highlights that the
proposals are clearly linked to the operational enhancement of an existing
and established industrial use. It is accepted that the development could not
be accommodated on an alternative site and there is no disagreement with
the applicant’s position. The applicant’s position that the principal impact on
the Green Belt arises from the access road and that character and function
of the Green Belt in this location will remain is also accepted. New planting
and landscaping will also have the potential to enhance the appearance of
the area. The Green Belt is also viewed within the context of the adjacent
industrial location, road infrastructure and overhead high voltage power
lines, and there is no disagreement with the applicant’s position that the
proposal would not result in significant or adverse impacts on countryside
and landscape character in this area, or adjacent settlements. No buildings
are proposed and this will further reduce visual impacts from the
surrounding area. 
7.15 Whilst not specifically highlighted in Policy 8 of NPF4 as a development
proposal specifically supported in the Green Belt, it is considered that the
applicant has demonstrated a locational requirement to support an
important local employer within an important industry that supports the
Scottish economy and that the aims, function and integrity of the Green Belt
will not be undermined by the development proposal, with mitigation
proposed as part of the design. It is considered that despite not being a
development proposal specifically supported in the Green Belt by Policy 8
of NPF4 and thus contrary to this aspect of the Policy, the overall intent of
the Policy is achieved and the principle of the development can be
accepted. The adopted Local Plan and proposed Local Development Plan
2 both take a similar approach to NPF4 in respect of protecting the Green
Belt and only allowing development in limited circumstances. The proposal
is considered contrary to both Plans.
7.16 Overall, the justification of the proposal set out by the applicant together
with the full detail of the development proposals have been considered.
Whilst the proposal is at variance with some aspects of the development
plan, most notably Policy 8 of the NPF4, together with Policy GB1 of both
the adopted Local Plan and proposed Local Development Plan 2, it is
considered that the material considerations are such that the principle of the

Page 14

proposal can be considered acceptable, subject to an assessment of the
matters below.
Landscape character, visual impact and design 
7.17 Landscape character is the distinct and recognisable pattern of elements
that occurs in a landscape leading to the way that it is perceived. The site
has the characteristics and appearance of agricultural and grazing land but
is situated with the main Kilmalid site to the north, a large factory building to
the east and the A82 Trunk Road to the south. Two overhead high voltage
electricity transmission also traverse the site from east to west. A variety of
trees and overgrown hedgerow are also found, but the character of the site
is not inherently rural. It is very much viewed in the context of a mixed
industrial and edge of settlement location. 
7.18 The construction of the new car park, lorry park and associated access
routes will have a visual impact. However, views from the A82 trunk road
are substantially screened by existing trees in the foreground. Views from
the riverside and from the residential area beyond would also be screened
by existing trees, and the bottling hall would also be the prominent feature
in the landscape from this location, rather than this proposal. Views from
Stirling Road are limited due to the Aggreko building located between the
road and much of the application site. There are no significant level changes
proposed across the site, although there will be undulations across the site,
with new SuDS areas, bridge across the Murroch Burn and bunding. A
comprehensive landscaping scheme is proposed to soften the new
development and minimise visual impact within the landscape. This
includes augmenting existing retained trees and hedgerows with significant
new tree planting. An entrance garden and plaza from the head of the new
access road and car park entrance to the pedestrian entrance to the site on
the southern boundary will be formed to provide access to the main
operational section of the wider facility and this will create a clear and
attractive arrival point. Whilst a large area of hard surface is to be created,
the visual impact can further be mitigated with the careful use of different
surfacing materials and the final details of this can be addressed by
condition. The final design and appearance of the bridge over the Murroch
Burn can also be addressed by condition.
7.19 Overall, it is considered that whilst there will be a visual impact resulting
from the development, the positioning within the landscape together with
the design proposals which include areas of new planting and landscaping
ensures that the impact on local landscape character is acceptable. 
Impact on trees and hedgerows
7.20 A large number of trees and hedgerows are located across the site, and the
application submission is informed by a tree survey which assesses the
individual trees. These vary in quality from Category A mature trees to U

Page 15

classified trees which are, for arboricultural reasons, unsuitable for retention
even in the absence of a development proposal. The application proposal
will result in the removal of 41 trees. The applicant sets out that the
proposals have been developed to protect and retain trees as far as
possible, and whilst some tree removal is proposed, the significant majority
of trees within and adjacent to the site are to be retained and protected.
With the exception of one Category A tree, the trees to be removed are
generally identified as being of lower quality Category C trees with a more
limited lifespan, and U classified trees where the correct course of action is
removal. The application proposal includes the planting of 93 new trees as
part of a comprehensive landscaping scheme which will compensate for
any loss of trees and hedgerows on site. Overall, as the new planting
matures, the proposals will result in an enhancement of tree cover at this
location to the long term benefit of the appearance of the wider landscape. 
Ecology, biodiversity and the natural environment
7.21  Ecological issues are considered by the applicant in a Habitat Survey. The
survey area includes both the application site and surrounding land. The
applicant notes that no part of the site is identified as internationally or
nationally important for nature conservation reasons with the nearest SSSI
being just under 2km from the site. There are also no local designations
within the site although a Local Nature Conservation Site lies in close
proximity to the west. The Murroch Glen is listed on the Ancient Woodland
Inventory and also lies in close proximity to the site, albeit the site does not
encroach on this area. A variety of habitat types have been identified within
the survey area including dense scrub, plantation woodland, marshy
grassland, poor semi-improved grassland, arable land, hardstanding and
defunct hedgerow. The appraisal identifies habitat exists for a variety of
species including bats, otter, water vole, reptiles, badger, birds including
suitable habitat to support nesting birds. 
7.22  Features suitable for roosting bats were found within mature sycamore trees
within the middle of the site together with dead Ash trees to the south of the
site. Further survey work is recommended in respect of the Sycamore trees
if these are to be removed or impacted upon by the development. The
submitted drawings indicate that these trees will be retained although in
close proximity to the proposed construction work. Further survey work is
also recommended prior to any works commencing within 30 metres of the
trees. As the possibility for roosting bats is established, the appropriate time
to undertake further survey work to ensure no disturbance occurs is prior to
construction and it is thus acceptable to address this by condition. In respect
of the Ash trees to the south of the site, two activity surveys are
recommended if works is to be carried out to the tree or if works are to take
place within 30 metres of them. These trees are to the south of the site,
unaffected by the proposals and in excess of 30 metres from any potential
construction work. It is therefore not considered further survey works is

Page 16

required in respect of these trees. No field signs of otter, water vole or
badger were found on site. However, evidence of otter was found to the
north of the site and the site has suitable foraging and commuting habitats,
together with suitable habitat for otter holts to the eastern end of the burn.
Despite there being no field signs, suitable habitat for foraging and
commuting badger exists. The site is noted as being unsuitable for
hedgehog. The habitat survey advises that pre-construction surveys for
otter and badger be carried out within eight weeks prior to construction
commencing due to the high mobility of wildlife. The avoidance of site
clearance works during the bird breeding season (March to September
inclusive) is preferred but if this is not possible the Habitat Survey
recommends a nesting bird survey be undertaken by an experienced
ecologist no more than 48 hours prior to any work being undertaken. No
further survey work in respect of reptiles is highlighted as being required.
The need to re-establish the baseline if works have not commenced within
12 months is highlighted although it is noted that the bat survey is identified
as being valid for 18 months. This can be addressed by condition.
7.23  The Council’s Biodiversity Officer has considered the Habitat Survey
submitted. No additional survey work is identified as being required,
however the Biodiversity Officer highlights the wide range of
recommendations for follow up surveys prior to the commencement of any
works on site as well as detailed advice on lighting schemes and advises
that these matters are addressed by condition. Clarification is sought on the
bridge over the Murroch Burn and whether mammal ledges should be
incorporated. It is considered that the requirement to incorporate mammal
ledges into the design can be addressed by condition. The Biodiversity
Officer highlights a known breeding sand martin colony on the Murroch Burn
near the A82 and that this should be considered in any mitigation. It is
possible that this colony is not only outwith the application site but outwith
the survey area, hence not being identified in the Habitat Survey, however
the requirement for identifying any required mitigation can be addressed by
condition. The Biodiversity Officer also highlights the lack of a consultation
to the Loch Lomond Fisheries Trust. With the exception of the road crossing
to the Murroch Burn and removal of an existing culvert in favour of a new
bridge which will improve the flow of the burn and reduce the chance of
blockages, the proposal has no impact on the Murroch Burn. The Habitat
Survey does not identify any requirement for survey work in respect of the
potential impact on fish species and the proposal is set back from and does
not impact upon the River Leven. Such a consultation is therefore not
considered necessary. 
7.24  NPF4 has a strong focus on the protection of biodiversity, reversing
biodiversity loss and delivering positive effects from development including
biodiversity enhancement and the incorporation of nature based solutions.
The very nature of the proposal, which will form large areas of hardstanding

Page 17

for vehicles, means that careful consideration is required of how new
planting and landscaped areas can be incorporated into the development
to give a tangible enhancement of biodiversity. The habitat survey
demonstrates that with appropriate mitigation as set out within the
recommendations, the development will not adversely impact upon
protected and other species or important biodiversity designations or
habitat. The habitat survey further identifies enhancement opportunities to
protect, restore and enhance biodiversity habitat networks and
environmental quality. This includes planting which considers the
connectivity of habitats and the use of native species. The incorporation of
nectar rich plants which flower at different times of the year is also
highlighted. The establishment of a bordering hedgerow between the new
car park and land beyond is recognised and the landscaping proposals
indicate such an approach. The incorporation of bird nesting boxes together
with bat boxes is highlighted although no specific details of how these
recommendations are incorporated into the development are provided. The
Council’s Biodiversity Officer highlights that it is difficult to establish the
biodiversity baseline in the absence of a report or inventory detailing tree
and hedgerow loss. Whilst a tree removal plan is provided together with a
tree survey, the comments of the Biodiversity Officer in respect of the
requirements to establish a clear baseline to inform if the new planting
proposals offer a positive effect for biodiversity are noted. It is considered
that the application submission demonstrates significant potential to provide
new planting and other features which will have a positive benefit in respect
of biodiversity in the local area as required by NPF4. The submission of
details which demonstrates an understanding on how the proposal
enhances biodiversity beyond the current baseline of this and addresses
any additions or adjustments to the landscaping proposals in respect of this
can be addressed by condition. 
7.25  Overall, subject to the approach set out above and the imposition of
conditions to any planning permission granted there are no unacceptable
ecology or biodiversity issues caused by the proposal and it is considered
that an enhancement of biodiversity beyond the current baseline can be
achieved. 
Traffic, Access and Road Safety
7.26  The applicant sets out that the proposal is to address established
operational challenges associated with staff, HGV and other vehicles
accessing, moving around and parking within the site. There is no
associated proposal to further increase floorspace within the wider site and
the applicant has indicated  that the proposals are not to facilitate or support
any uplift in activity, number of vehicle visits to the site nor are they to
support any increase in staffing levels. The proposals are directed towards
improving the efficiency and safety of the site for staff and other visitors.
The applicant sets out that presently, access to the site for all staff and

Page 18

visitors together with deliveries is taken directly from the existing industrial
estate access road. Vehicle checking requirements can often cause delays
for HGVs entering the site which results in congestion within the site which
can in turn impact on traffic on the public road. A shortfall in parking can
also cause delays during shift changes with incoming staff who travel by car
unable to find a car park space.  Shift changeover arrangements results in
the incoming shift arriving prior to the outgoing shift leaving, resulting in
significant additional parking demand. Car park occupancy and demand
has been identified to exceed availability resulting in overspill parking within
the site. The additional parking area will accommodate this overspill
together with providing capacity for visitors. The proposal will also allow the
creation of a secure onsite lorry park to hold finished goods prior to
distribution to UK markets or port for export. The applicant also highlights
that the changes to the internal site arrangements are a Health and Safety
requirement in respect of segregating HGVs and pedestrians. The new
access road will provide for additional emergency access in the event of a
major incident. 
7.27  With no new floorspace proposed and no proposed increase in staffing
numbers, the proposal will accommodate existing traffic already travelling
to the facility rather than generate new or additional traffic which would have
the potential to impact on traffic using the existing road network. Indeed,
there is no objection or points raised from the Council’s Roads Service in
respect of the operation of the existing road network. In terms of the new
access, this is noted by the Roads Service as being a new private road and
accordingly it is not necessary to provide detailed observations on design
or construction details. Following some points of clarification from the
applicant on the operation of the private road inclusive of traffic calming, the
Road’s Service have no objection to the proposals. It is therefore
considered that the proposal will not result in any traffic or road safety
implications. 
Sustainable Transport
7.28 In assessing the previous application for the new bottling facility, it was
recognised that the new facility would increase the staffing levels on site
and due to a combination of the location of the plant within an industrial area
away from nearby residential properties and a shift pattern that did not
readily match with public transport provision, a high proportion of staff would
be expected to travel by car. It was considered that while location of the site
and the nature of shift working were not ideal for sustainable travel, the
applicant’s proposal was acceptable. A condition was attached requiring a
comprehensive Travel Plan that sets out proposals for reducing
dependency to be agreed. This includes the applicant encouraging car
sharing, provide a cycle to work scheme, have and are expanding EV
charging infrastructure and cycle shelters across the site. The supporting
documents for the current application also note that proposals for a shuttle

Page 19

bus service between the site and public transport nodes (for example the
railway station) are being progressed.
7.29  This proposal does not increase floorspace, staff numbers or the operation
of the long established site beyond the current position. The segregation of
HGVs and other traffic together with the provision of walking routes to the
new entrance plaza inclusive of identified crossing points is welcomed. It
remains that the site is also no less accessible by public transport than as
current. The provision of electric vehicle and cycle charging points can be
addressed by condition. However, despite the travel plan agreed as part of
the previous planning permission for the bottling hall, the requirement for
additional car parking and the overspill parking within the site identified by
the applicant in support of the proposal indicates that there has been no
modal shift in travel patterns, which remain dominated by the private car.
The provision of additional car parking may alleviate on-site parking
problems, but it will do nothing to promote a shift in travel patterns. Given
this and the fact that to date, the previously agreed travel plan appears to
have been unsuccessful in promoting a shift away from the private car, it is
considered appropriate to require a full review of the travel plan. This will
require to include what targets have been achieved, what targets have not
been achieved and why they have not been achieved. Further initiatives will
also require to be brought forward in the future to ensure the achievement
of a meaningful switch away from the private car. This can be addressed by
condition. 
7.30  Overall, whilst it remains that the location of the site and the nature of shift
working are not ideal for sustainable travel, the approach set out above will
ensure efforts to support sustainable travel and encourage a shift away from
the private car are maximised. 
Flooding and Drainage
7.31 The assessment of flooding matters is informed by the applicant’s Technical
Memo on flooding, which was updated during the assessment of the
application following an initial holding objection from SEPA. A hydrological
and hydraulic modelling assessment has been undertaken to identify the 1
in 200 year and 1 in 200 year plus climate change uplift flood levels and
flow pathways. This identifies that in extreme flow conditions, the Murroch
Burn is predicted to overtop the left bank of the channel and flood the
proposed access road location. Mitigation in the form of a bypass structure
is included in the design to maintain the flow pathway. Bank erosion has
also been recorded and protection measures may also be required to
mitigate further loss. Modelling of the post-development scenario indicates
that flood levels both up and downstream of the site would remain largely
unchanged, with a 60mm increase to flood levels immediately upstream of
the road during the 1 in 200 year plus climate change scenario and a slight
reduction to the flood extent on land to the south and east. Proposed flow

Page 20

pathways will ensure the functionality of the floodplain storage is not
compromised by the proposed road. 
7.32 SEPA confirm that they are broadly in agreement with the assessment of
flood risk and the proposed mitigation. The Council’s Roads Service in their
capacity as local flood prevention authority note that the proposed location
of the road is outwith the Coastal Flood Reach and the soffit dimensions of
the new bridge over the Murroch Burn shows that it will not be classified as
a restrictive structure which would increase fluvial flood risk. Accordingly,
they offer no objections to the proposal. 
7.33 Notwithstanding the above and the broad acceptance that the proposal
does not increase flood risk, adversely impact upon flood plain storage or
result in flooding of anything beyond an access road, SEPA highlight that
Policy 22 of NPF4 promotes a precautionary approach to flooding by
avoiding new development in areas at risk of flooding. This is defined as
‘land or built form with an annual probability of being flooded of greater than
0.5% which must include an appropriate allowance for future climate
change’. The proposal involves a new road across an area of land that falls
within the definition of a flood risk area described above. However, Policy
22 (a) does indicate development proposals in a flood risk area will be
supported if they are for essential infrastructure where the location is
required for operational reasons. SEPA advise that the Planning Authority
are best placed to determine the acceptability of the proposals in
accordance with the overall policy framework in NPF4. Therefore, if the
Council is satisfied the requirements have been met, then they can offer no
objection to this planning application on the grounds of flood risk. However,
if it is determined the requirements are not met and the proposal does not
meet the exceptions defined in Policy 22, then based on the site specifics
SEPA’s position should be considered as an objection relating to the access
road through the flood risk area.
7.34 The applicant highlights that only a small part of the application proposals
are potentially impacted by flooding and that the road is necessary to secure
site specific health and safety benefits and qualifies as essential
infrastructure required for operational reasons, as defined in NPF4. The
applicant further highlights that this qualification is due to the road being a
transport proposal which supports and facilitates the delivery of business
and industrial development that is identified in and supported by allocations
in the local plan and proposed Local Development Plan 2. The applicant
contends that this establishes that the proposal falls within the scope of the
first of the set of tests set by Policy 22 in that the proposed road is ‘essential
infrastructure where the location is required for operational reasons’. In
considering the applicant’s position, it is important to note that essential
infrastructure is clearly defined in NPF4. For transport proposals to fall
under this definition, they require to be identified in the local development

Page 21

plan. Whilst the applicant is correct that the access road is associated with
developing a business and industrial allocation within the adopted local plan
and proposed Local Development Plan 2, it is in itself not a transport
proposal identified in the Plans. It also extends across an area of green belt.
Accordingly, the proposal is not essential infrastructure as defined by NPF4
and not supported by part (a) of Policy 22 of NPF4. Notwithstanding this, all
risks of flooding are understood and addressed, there is no reduction in
floodplain capacity or increased flood risk, and the development will remain
safe and operational during flood events with alternative accesses. No new
buildings will be constructed that are at risk of flooding. The proposal also
seeks to manage surface water through sustainable drainage systems.
Therefore, despite being in conflict with Policy 22 (a) of NPF4, there is
nothing that suggests that overall an unacceptable risk of flooding occurs
and the proposal compromises the overall precautionary approach of NPF4
is compromised. Owing to the development encroaching into an area
identified as being at risk of flooding on the site the development is not
supported by Policies F1 and F3 of the adopted Local Plan and Policy ENV6
of the proposed Local Development Plan.
7.35 Despite the position set out above, as the proposal is not essential
infrastructure as defined by NPF4 and not supported by part (a) of Policy
22 of NPF4, the response from SEPA must be treated as an objection.
Therefore, if the Council considered that on balance, material
considerations were such that the application should be approved contrary
to Policy 22 of NPF4, the objection from SEPA would require the Council to
notify the Scottish Ministers before planning permission could be granted.
Impact on recreation, open space and the core path network
7.36 The development will not result in the loss of open space that has been laid
out with the purpose of providing amenity, an area of public access or an
area for countryside recreation. There is also no impact on any areas of
open space specifically identified on the Proposals Maps of the adopted
local plan or proposed local development plan. Consequently, it is not
considered that the proposal will adversely impact on open space or
countryside recreation or the sustainable access to such.
7.37 The proposal does impact on the local footpath network with a core path
located to the south of the site. This runs from Stirling Road towards the
banks of the Leven where it continues in a generally southerly direction. A
localised section of this core path will be affected by the development with
the route diverted to allow it to cross the new access road before continuing
towards Stirling Road. Overall, the impact on the wider core path will be not
be significant. The diversion proposed is considered to be appropriate and
the impact on users of the core path will be minimal. The diversion of the
core path can be addressed via the relevant provisions in the Planning
Legislation following the grant of any planning permission.

Page 22

Impact on built and cultural heritage
7.38 One listed building lies within approximately 40 metres of the application
site. The Category B “Entrance to Vale of Leven Industrial Estate” which
comprises a classical portico with 4 fluted ionic columns on a podium of
steps is to the east of the northern part of the application site adjacent of
the Lionsgate roundabout. Despite the proximity to the site, the industrial
nature of the adjacent area is already an established part of its setting and
the development proposal is not considered to impact on the setting of the
listed building. 
7.39 Turning to archaeology, the applicant has submitted an archaeological
evaluation in support of the proposal and this was informed by a programme
of trial trenching, with five trenches excavated to investigate the survival of
physical remains relating to the site of a farmstead named Gateside which
is shown as being within the development area on various historic maps.
No structural remains were identified although possible demolition material
was noted. A shred of post medieval glazed pottery was recovered along
with shreds dating from late 19th or early 20th century. The West of Scotland
Archaeological Service advises that although the trenches did not identify
any surviving features or artefacts, archaeological monitoring during the
ground works as suggested by the applicant’s report should be
implemented. A condition is advised in this respect and this can be attached
if planning permission is granted. 
Other technical matters and those raised in the consultation responses
7.40 The Council’s Environmental Health Service offers no objections to the
proposal with conditions recommended in respect of the possibility of
encountering unexpected contamination and the importation and reuse of
soils. No concerns are raised in respect of the possibility for the
development to adversely impact on residential amenity.  A condition is,
however, recommended in respect of the hours of construction to ensure
no unacceptable disturbance occurs at unsocial hours. 
7.41 The site is within an identified zone where a consultation is required with
the Health and Safety Executive (HSE) and they do not advise against the
grant of planning permission for this proposal nor is any further consultation
identified as being required.  Scottish Water and Scottish Power Energy
Networks offer no impediment to the proposal although both consultees
identify that they have infrastructure in the area. 
7.42  Finally, whilst the land has been used for agriculture previously, Scotland’s
Soils map classifies the lands as Class 4.2, which is not “prime” agricultural
land and does not include any peatland habitat or carbon rich soils.

Page 23

Pre-application consultation
7. 43 The application was subject to statutory Pre-Application Consultation, and
a public consultation event was held in Strathleven House on 19th July 2022.
Attendance at the public meeting was limited. Separate meetings were held
with Bonhill and Dalmonach Community Council and Strathleven
Regeneration C.I.C. Assurances were offered to the Community Council on
the retention of the core path as part of the proposals and the proposed
route of the access road was adjusted in collaboration with Strathleven
Regeneration C.I.C.
8. CONCLUSION
8.1 The applicant is an important local employer in a strategically important
industrial sector. NPF4 recognises the importance of the whisky industry as
part of the food and drink sector and the significant contribution this brings
to the economy. The Kilmalid site is also within a Strategic Industrial and
Business Location where employment development is encouraged.  The
site has undergone significant recent investment and the current proposal
continues this investment which supports employment at the site which in
turn provides significant economic benefit for the Dumbarton and wider
area. Overall, this is supported. The application proposal is designed to
address a variety of operational issues within the existing site including
alleviating existing congestion and associated road safety concerns,
segregating HGVs and other traffic, and addressing parking capacity and
existing overspill parking. 
8.2 Policy 26 of NPF4 supports development proposals for business and
industrial uses on sites allocated within the Local Development Plan. The
majority of the site is within an area specifically designated for Business and
Industrial use, and reserved for expansion of the operations at the plant. As
noted above, whilst the proposal does not result in an increase in business
and industrial floorspace related to Use Classes 4, 5 or 6 as per the
development plan allocation, it is clear from the applicant’s supporting
documents that the development is intrinsically linked to the operation of the
existing plant and on completion will become part of a wider industrial site. 
Part of the site does, however, extend into the Green Belt and the
development proposal is not specifically identified in Policy 8 of NPF4 as
one which is supported in the Green Belt. It is considered, however, that the
applicant has demonstrated a locational requirement to support an
important local employer and it is considered that the aims, function and
integrity of the Green Belt will not be undermined by the development
proposal. 
8.3 It is acknowledged that a section of the access road is located on an area
which is identified as being at risk of flooding. In assessing the proposal, all

Page 24

risks of flooding are understood and addressed, there is no reduction in
floodplain capacity or increased flood risk, and the development will remain
safe and operational during flood events with alternative accesses. No new
buildings will be constructed that are at risk of flooding. The proposal also
seeks to manage surface water through SuDS. However, in policy terms the
proposal is not supported by Policy 22 (a) of NPF4 as it is in a flood risk
area. 
8.4 In further assessing the application proposal with reference to landscape,
visual impact and design, impact on trees and hedgerows, impact on
ecology and biodiversity inclusive of achieving a biodiversity gain, traffic and
road safety, sustainable transport, impact on open space and recreation,
and impact on built and cultural heritage, all have been addressed and do
not present any impediment to the granting of planning permission. With the
exception of the response from SEPA, no concerns arise that cannot be
addressed by appropriate condition. 
8.5 Section 25 of The Town and Country Planning (Scotland) Act 1997 requires
that planning applications be determined in accordance with the
Development Plan unless material considerations indicate otherwise. As set
out above, the proposal is considered to be contrary to aspects of both
Policy 8 and Policy 22 of NPF4, relating to the encroachment to the Green
Belt and flooding respectively. For the same reasons, the proposal is also
contrary to Policies F1, F3 (flooding) and GB1 (Green Belt) of the adopted
Local Plan together with Policies ENV6 (flooding) and GB1 of proposed
Local Development Plan 2. Having fully assessed all material planning
considerations, the benefits of further inward investment which supports an
important local employer within a key industry, and addressing various
operational issues that are identified at the site outweigh that the proposal
is not one which is specifically supported by Policies 8 and 22 of NPF4.  It
is therefore concluded that the material considerations are such that this
application can be supported and the departure from specific policy aspects
of NPF4 is justified and planning permission supported. 
8.6 It is the case, however, that due to the proposal being contrary to Policy 22
(a) of NPF4, and as SEPA set out in their consultation response, the
response requires to be treated as an objection and referral would be
required to the Scottish Ministers under The Town and Country Planning
(Notification of Applications) (Scotland) Direction 2009., should the
Committee be minded to grant planning permission.
9. CONDITIONS
1. Prior to the commencement of development on site, exact details, specifications
and samples of all proposed hardsurfacing to be used within the development site
shall be submitted to and approved in writing  by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the

Page 25

development shall be completed in strict accordance with the approved material
details.  
2. That prior to the commencement of works on site, final details of the proposed road
bridge over the Murroch Burn, inclusive of design, external materials and samples
of external materials be submitted to and approved in writing by the Planning
Authority. Thereafter, unless otherwise agreed in writing with the Planning
Authority, the development shall be completed in strict accordance with the
approved material details.
3. The approved hard and soft landscaping and all associated approved planting
details, inclusive of all new tree planting, shall be implemented within a timescale
to be agreed prior to the commencement of works on site.
4. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the next planting season with others of a similar size and species.
5. That full details of maintenance and management for the landscaping approved
shall be submitted to and approved in writing by the Planning Authority prior to the
commencement of works on site. Management and maintenance shall commence
within a timescale agreed with the Planning Authority.
6. Notwithstanding the approved plans and condition 3 above, and prior to the
commencement of works on site, a further submission which demonstrates an
understanding on how the proposal enhances biodiversity beyond the current
baseline including any adjustments to the approved landscaping proposals
together with the implementation on site shall be submitted to and approved in
writing by the Planning Authority. All measures shall then be implemented as
approved.
7. All recommendations within the Phase 1 Habitat Survey dated 15th March 2022
shall be followed. This shall include all required further survey work identified as
being required inclusive of Bats, Otter, Badger and nesting birds. All further survey
work undertaken shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of any works on site and implemented as
approved.
8. Notwithstanding condition 7 above, further survey shall be undertaken to identify
any possible impact on the Sand Martin colony known to breed on the Murroch
Burn near the A82 and the requirement for mitigation. The survey shall be
submitted to and approved in writing by the Planning Authority and any required
mitigation identified implemented within an agreed timescale with the Planning
Authority. . .
9. Notwithstanding condition 7 above and prior to the commencement of works on
site,  details of the incorporation of mammal ledges into the design of the new
bridge over the Murroch Burn shall be submitted to and approved in writing by the
Planning Authority. Works shall then proceed as approved.

Page 26

10. Notwithstanding condition 7 above, full details of how the enhancement proposals
set out in the Habitat Survey will be implemented on site shall be submitted to and
approved in writing by the Planning Authority. The implementation of these
proposals shall then proceed as approved.
11. That prior to the commencement of works, on site tree protection measures for all
trees to be retained both within or adjacent to the application site shall be erected
in accordance with British Standards Recommendations for trees in Relation to
Construction, currently BS 5837:2012, with evidence of this having been
undertaken  and not removed during the course of construction work.
12. That prior to the commencement of works on site, a full review of the Travel Plan
for the site shall be undertaken and submitted to and approved in writing by the
Planning Authority.  For the avoidance of doubt, this review shall include setting
out what targets of the Travel Plan agreed in connection with planning permission
DC17/129 have been achieved, what targets have not been achieved and why
they have not been achieved, and what further initiatives will be brought forward in
the future to ensure the achievement of a meaningful switch away from the private
car. Any agreed actions and measures shall be implemented at the same time as
the site being brought into use.
13. Prior to the commencement of works on site, full details of the location and design
of  electric vehicle and electric cycle charging points/units and associated
infrastructure and ducting shall be submitted to and approved in writing by the
Planning Authority. For the avoidance of doubt, this shall include how future
required provision shall be accommodated. The approved charging
points/units/ducting and associated infrastructure shall thereafter be installed in
accordance with the approved details  and maintained at all times thereafter.
14. The development shall be drained in accordance with the details set out on the
approved drainage drawings and the drainage arrangements, inclusive of SuDs,
shall be fully implemented prior to the occupation and use of the development
hereby permitted, otherwise approved in writing by the Planning Authority.
15. The presence of any previously unexpected contamination that becomes evident
during the development of the site shall be reported to the Planning Authority in
writing within one week, and work on the site shall cease. At this stage, if requested
by the Planning Authority, an appropriate investigation and risk assessment shall
be undertaken and a remediation scheme shall be submitted to and approved by
the Planning Authority prior to the recommencement of site works. The approved
details shall be implemented as approved.
16. If there is a requirement to either re-use site won material or to import material then
the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition to
this and in accordance with BS3882:2015 and BS8601:2013, material to be used
in the top 300mm shall also be free from metals, plastic, wood, glass, tarmac,
paper and odours.

Page 27

On completion of the works and at a time and or phasing agreed by the Planning
Authority, the developer shall submit a validation report containing details of the
source of the material and associated test results to demonstrate its suitability for
use
17. During the period of construction, all works and ancillary operations (including
piling) which are audible at the site boundary (or at such other place(s) as may first
be agreed in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning Authority:
• Mondays to Fridays: 0800-1800
• Saturday: 0800-1300
• Sundays and public holidays: No working
18. No development shall take place within the development site until the developer
has secured the implementation of a programme of archaeological works in
accordance with a written scheme of investigation which has been submitted to,
and agreed in writing with the Planning Authority in consultation with the West of
Scotland Archelogy Service. Thereafter, the developer shall ensure that the
programme of archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is undertaken to
the satisfaction of the Planning Authority in agreement with the West of Scotland
Archology Service.
19. Notwithstanding the approved plans, details of the design and siting of all external
lighting shall be submitted to and approved by the Planning Authority prior to the
commencement of development on site and shall be implemented as approved.
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager
Date: 14th June 2023
Person to Contact: Pamela Clifford, Planning & Building Standards Manager
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. National Planning Framework 4
3. West Dunbartonshire Local Plan 2010
4. Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended

Page 28

5. Green Network and Green Infrastructure
Supplementary Guidance (Finalised 2022)
6. Consultation responses
Wards affected: Ward 2 - Leven