WEST DUNBARTONSHIRE COUNCIL 
Report by Planning, Building Standards and Environmental Health Manager 
Planning Committee:  19th April 2023 
_____________________________________________________________ 
DC22/129/FUL: Proposed redevelopment of site of former quarry and
garages / workshops to allow the introduction of three
holiday letting lodges (with ancillary car parking) at
Dumbuck Old Quarry, Strowanswell Road, Dumbarton
by Mr K McVey 
1. REASON FOR REPORT 
1.1 An elected member has requested the application to be determined by
the Planning Committee and this has been agreed in conjunction with
the Convenor of the Committee and the appointed Officer. Under the
terms of the approved Scheme of Delegation, it therefore requires to be
determined by the Planning Committee. 
2. RECOMMENDATIONS 
2.1 Grant planning permission subject to the conditions set out in Section 9
below. 
3. DEVELOPMENT DETAILS 
3.1 The application site is located at the head of Strowanswell Road which
is situated on the northern outskirts of Dumbarton and accessed from
the A82 trunk road (Stirling Road). Whilst the adjacent built-up area is
predominantly residential in character with a mix of residential
properties, there is also a limited non-residential element in the form of
a used vehicle dealership in Glenpath. A further used vehicle sales site
together with a hotel also lie to the southern side of the A82. The site is
accessed via a privately-owned, short, unsurfaced part of Strowanswell
Road, which also serves two residential properties known as Glenpath
Cottages, including one inhabited by the applicant. The northern
perimeter of the site is delineated by the footpath which follows the
course of Gruggies Burn through the adjacent wooded area, and leads
to the historic Strowan’s Well which the road the site is accessed from is
named after; the path also leads further through the woodland into the
areas of and surrounding Barnhill, Overton House and Milton Brae. 
3.2 The site which measures just under 8,000sqm in footprint and has a
longitudinal shape, has varied and diverse history. Recorded in the
Gazateer as Dumbuck Old Quarry, the site is also known as the former
High Mains Quarry. Originally used as a quarry, it was then used as a
shooting range by the local police force. Thereafter, the site
Page 1 of 14

Page 2

accommodated garages/storage and vehicle workshops before falling
into disuse and becoming overgrown. More recently, a variety of
groundworks and other development has been undertaken. The former
quarry has been cleared of waste, cleared of vegetation overgrowth,
including that affecting the aforementioned Gruggies Burn path, and
some groundworks undertaken in preparation of the development of the
plot. Secure fencing has been installed along the northern perimeter of
the site. Moreover, the sole remaining original structure in the form of an
old storage/garage building, has been in use as shelter for a small herd
of farm animals, mostly llamas, which graze on the site.   
3.3 The development proposed through this application would consist of
three holiday letting lodges, all to be located towards the western edge
of the site leading onto Strowanswell Rd. They are of a mobile and
prefabricated variety as follows: 
• Two single-bedroom units, with a rectangular footprint of
26.7sqm each. The structures are of 3.6m in height, 2.5m in
eaves, with a pitched roof. One of the gable elevations
features a side door with full height glazing providing access
to the internal lounge, while the other gable has a small
window serving the bedroom. The front elevation features a
smaller window on the left hand side when facing this
elevation, a full height window on the right and a decorative
door with full height glazing on either side, found in the central
part of the elevation. The rear elevation is blank. Internally,
each unit consists of a combined kitchen/lounge, a shower
room and a bedroom. No information has been provided on
the materials and finishes. 
• One two-bedroom unit, with a mostly rectangular footprint of
77sqm, including the porch. The structure is of 5.6m in height,
3m in eaves, with a pitched roof. The gable elevations are
blank, while the front elevation features five windows and a
door in one of the gable elevations of the porch. The rear
elevation features three windows and a set of French doors
with small steps for access. The front porch is served by a
ramp, enabling access for guests using wheelchairs and
experiencing other mobility challenges. Internally, the unit
consists of a combined kitchen/lounge with a small storage
unit, a shared bathroom, a master bedroom with an en-suite
and another bedroom with no dedicated bathroom facilities. In
terms of materials and finishes, the unit walls is made of
painted larch cladding, the windows and doors are made of
timber, while the roof cover is painted corrugated steel roof. 
3.4 The lodges are described by the applicant as being rated as having high
thermal and energy efficiency, potentially enabling full-year use,
including in the winter weather conditions. There is ancillary parking in
the form of two spaces for the larger lodge and one parking space per
Page 2 of 14

Page 3

each smaller lodge (no. four spaces in total) would be provided, along
with soft landscaping to provide a degree of separation between the
lodges. 
3.5 The business plan submitted with the application states that the site and
the structures within it would become a small-scale tourism and leisure
destination to offer short term stay holiday accommodation for families,
groups and individuals. The maximum number of guests would be
capped at 8-10 at full occupancy, which is consistent with the number of
the lodges and bedrooms proposed in the application. The aim is to
additionally provide guided walks in the nearby forest tracks, llama
trekking and electric cycle hire along with respite programmes utilising
the natural environment in the area would be offered to visitors. The
submitted application solely relates to the provision of the three lodges
on site. Any further development beyond these lodges and associated
works would necessitate a further planning application in the future. This
will include any permanent, future arrangements for the livestock
currently on site which are understood to be housed temporarily within
the forward part of the site, pending the outcome of this planning
application. 
4. CONSULTATIONS 
4.1 West Dunbartonshire Council Environmental Health Service have  no
objection subject to condition on a land contamination desktop study and
site investigation works report to be carried out and submitted prior to
the site becoming operational. 
4.2 West Dunbartonshire Council Roads Service have no objection on
highway safety and parking. No objection in relation to flooding risk or
impact on Gruggies Burn. 
4.3 Transport Scotland have no objections to the proposed development. 
4.4 West Dunbartonshire Council Biodiversity Officer has no objection
subject to the recommendations made in Section 5.2 of the Preliminary
Ecological Report are conditioned. 
5. REPRESENTATIONS 
5.1 Objections were received from two neighbouring householders in
connection with the proposal. A further representation was received in
which it is indicated that the proposal is supported although concerns on
specific aspects are highlighted. The full details are contained within the
planning file and are available for public viewing. However, for the
purposes of this report, the material planning points raised can be
summarised as follows: 
• Concern over the presence of the invasive species of Japanese
Knotweed and Giant Hogweed within the site and near the Barnhill
Page 3 of 14

Page 4

Road right of way and possible contamination of the nearby land due
by the guests.
• Change in noise levels from the nearby trunk road due to the
clearance of trees and concern over the noise generated by the
proposed use, specifically guest activity and the llama trekking
aspect.
• Smell from the animals kept at the site during warm weather.
• Flooding.
• Impact on traffic on the A82 trunk road.
• Details of what  soil assessment has been carried out. 
• Details of the Preliminary Ecological Appraisal.
• Concern over impact on wildlife.
• Concern over the impact of traffic generated by the use and impact
of parking on Strowanswell Rd.
• Concern over noise, in particular in relation to the dogs present at the
residential site directly adjacent to the site of the lodge business.
• Concern over the appropriateness of the site location and its
proposed layout, landscaping, design and visual impact.
• Concern over the proposal having a negative effect on the nearby
Local Nature Conservation Site.
• Concern over the proposal failing to meet the criteria of the relevant
planning policies in relation to Green Networks and Green Belt.
• Access to Strowan’s Well via Strowanswell Road.
• Boundaries and land ownerships.
• Possible future expansion of the business to operate from the site.
• Use of Core Path running through the objector’s garden and the
possible impact of the proposal on it.
• Construction of garden building on land adjacent to the site for use in
connection with a business. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Framework 4
6.1 National Planning Framework 4 (NPF4) was adopted by the Scottish
Ministers on 13th of February 2023 and now forms part of the
Development Plan. 
6.2 Policy 1 relates to tackling the climate and nature crises. When
considering all development proposals significant weight will be given to
the global climate and nature crises. Policy 2 also relates to the climate
in the form of climate mitigation and adaptation. Policy 3 seeks to protect
biodiversity, reverse biodiversity loss, and deliver positive effects from
development and strengthen nature networks. Criterion (c) states that
proposals for local development will include appropriate measures to
conserve, restore and enhance biodiversity, in accordance with national
and local guidance. Measures should be proportionate to the nature and
scale of development. This small scale tourism proposal is not
considered to raise any issues in respect of policies 1 and 2. A
Preliminary Ecological Appraisal considers biodiversity and sets out
Page 4 of 14

Page 5

various recommendations and enhancements and the proposal is thus
supported by Policy 3.   
6.3 Policy 8 seeks to promote and facilitate compact urban growth and only
supports development in the Green Belt in certain circumstances. This
includes tourism developments. Proposals are also required to meet
additional criteria, including the need for development to be compatible
with the surrounding established countryside and landscape character;
be designed to an appropriate scale, massing and external appearance;
use materials that minimise visual impact on the green belt as far as
possible; and have no significant long-term impacts on the
environmental quality of the Green Belt. Following a full assessment of
the detail of the proposal as set out in Section 7 below, the proposal
presents no conflict with Policy 8. 
6.4 Policy 14 aims to promote and facilitate well designed development that 
makes successful places by taking a design-led approach and applying
the place principle. The policy supports proposals which are consistent
with the six qualities of successful places; healthy, pleasant, connected,
distinctive, sustainable and adaptable and it is considered that this is
achieved.  Flood risk and water management is addressed in Policy 22.
The proposal is not at risk of flooding or considered to add to flood risk. 
6.5 Development proposals that are likely to raise unacceptable noise
issues will not be supported, in accordance with Policy 23. Following a
full assessment, it is considered that any noise impact would be
acceptable with the imposition of appropriate conditions and no adverse
issues have been raised by the Environmental Health Service. Tourism
proposals are addressed by Policy 30, which sets out a range of criteria
to be taken into account. This tourism proposal is considered
supportable. 
6.6 Overall, it is considered that the proposal is supported by and presents
no conflict with the policies set out within NPF4 and is assessed fully in
Section 7 below. 
West Dunbartonshire Local Plan 2010
6.7 Policy GD1 seeks to ensure that all new development enhances the Plan
area and environmental quality in general through an emphasis on high
quality design. Proposals are required to meet a number of criteria and
it is considered that the small scale tourism proposal is acceptable in this
respect. Policy LE8 supports applications for tourist industry
development, subject to a range of criteria and it is considered this
tourism development can be supported. Policy F1 addresses flooding
and the proposal raises no concerns in this respect.  Matters relating to
Biodiversity are fully addressed with reference to Policy E1. Finally, the
impact on residential amenity is considered acceptable and there is no
conflict with Policy H5. 
Page 5 of 14

Page 6

6.8 The proposal complies with the policies of the adopted Local Plan and
is assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan 2
7.1 On 15 March 2023, the Planning Committee took a decision that the
Council would not adopt Local Development Plan 2. The Proposed Local
Development Plan 2 (LDP2), incorporating the recommended
modifications of the Examination Report received on 22 April 2020,
which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore
afforded significant weight in the assessment and determination of
planning applications, subject to compatibility with NPF4. The Scottish
Ministers’ Direction relating to the adoption of LDP2, dated 18 December
2020, is also a material consideration. 
7.2 Policy GB1 seeks to direct new development towards the urban area in
order to support regeneration and maintain the attractiveness and
character of the Green Belt, whilst also supporting economic
development and diversification in the Green Belt, under certain
circumstances. This support is subject to a number of additional
requirements being met, including the need for proposals to be fully
compatible with surrounding established countryside character, and
avoid unacceptable impacts on the environmental quality and landscape
character of the Green Belt. A small scale tourism development is
supported within the Green Belt. The layout and design is considered to
be compatible with the surrounding landscape character and avoid any
significant adverse effects on the landscape and surrounding
environmental quality. 
7.3 Policy CP1 requires new development to take a design-led approach to
creating sustainable places, which put the needs of people first and
demonstrate the six qualities of successful places.  It is considered that
the proposal complies with the policy. Matters relating to ecology and
biodiversity are also satisfactorily addressed with reference to Policy
ENV1. 
7.4 Policy E6 supports tourist facilities where there would be no adverse
effect on the integrity of a Natura 2000 site and they avoid adverse
impacts on the green network and built heritage. There is no conflicts
with this policy. 
7.5 Policy ENV6 addresses flooding and the proposal raises no concerns in
this respect.  Matters relating to Biodiversity are fully addressed with
reference to Policy ENV1. Finally, the impact on residential amenity is
considered acceptable, there is no conflict with Policy H4 and no
unacceptable noise pollution would occur as required by Policy ENV8. 
Page 6 of 14

Page 7

7.6 It is considered that the proposal being assessed presents no conflict
the relevant policies of the proposed LDP2. 
Principle of development
7.7 The site is located within the Green Belt as defined by proposed Local
Development Plan 2 which represents the Council’s most up to date
policy position. Policy 8 of NPF4 and Policy GB1 of proposed Local
Development Plan 2 set out the uses which will be supported within the
Green Belt. This includes tourism uses which are appropriate for and
require a location within the Green Belt. It remains that any such
proposals require to have no unacceptable impact on the Green Belt,
landscape character, does not undermine the purpose of the Green Belt
and are of an appropriate scale and design.   The principle of the
establishment of three tourism lodges at the site is in accordance with
these overriding policies but further regard is needed to their setting and
design in terms of landscape character. A condition is considered
appropriate to limit the occupancy period of the units to ensure that they
do not become permanent residential dwellings which contribute to an
expansion of the settlement into the Green Belt, as this would undermine
the purpose of the Green Belt and associated policies. A supporting
statement has also been submitted by the agent. While a financial
appraisal has not been provided, the statistical information presented in
the business plan discusses rising tourism levels in Scotland and the
area, as well as current trends in holidaymaking, with greater interest in
UK-based stays and outdoor leisure. Alongside the outdoor activities to
be offered to the visitors using the proposed accommodation, which
utilise both the setting of the application site as well as the areas of
nature in Barnhill and beyond, the intended business model is
considered realistic and appropriate in principle. 
7.8 It is considered that the Green Belt location is also justified as being
required as the enclosed and tranquil setting would form a key attraction
point for the use that could not readily be achieved within the heart of an
urban area. Tourism developments are also supported in principle by
NPF4 and the Local Development Plan subject to a full assessment of
all relevant policies and considerations. 
Design, layout and visual impact
7.9 The application site is located at the head of the privately owned part of
Strowanswell Rd. Directly north of it, an area of woodland with the
Gruggies Burn can be found; the watercourse can be followed on a path
parallel to it and leading to the areas of forest and countryside in Barnhill
as well as the Overtoun House and trails leading to Kilpatrick Hills further
east. 
7.10 In terms of the design and landscape character the lodges are of a
modest scale, with their total footprint slightly over 131sqm. The lodges
are to be clad in timber with a metal roofs. The larger unit has a small
porch and a low-rise access ramp associated with it also so it can be
used by people with mobility issues. The siting of the three modest
Page 7 of 14

Page 8

lodges, along with the clearance of waste, overgrown vegetation and
installation of new fencing is a marked improvement on the previous
condition of the site. The site remains well screened with the topography
and vegetation along the boundaries of the site. The very contained
nature of the former Quarry results in the visibility of the site also being
contained to adjacent vantage points. Having regard to the modest scale
of the lodges, the wider setting and backdrop it is considered that the
visual impact will be minimal and will not have a discernible adverse
impact of the wider countryside extending east of the site, nor would it
have any excessive impact on the existing neighbourhood. The
development is therefore considered to be acceptable in terms of
existing neighbourhood and landscape character. 
Residential amenity
7.11 Whilst within a Green Belt location, the site is adjacent to nearby
residential properties. The potential impact on adjacent residential
amenity therefore requires careful consideration. Undoubtedly the
lodges will bring an element of activity to the former Quarry. However, it
is considered that the introduction of three holiday lodges of a modest
scale is unlikely to give rise to a substantial loss of residential amenity to
the neighbouring homes. The wider locality does also feature non-
residential uses, with a garage and a second hand car dealership located
to the south of the application site. The siting of three self-contained
tourism units is not considered to be incompatible with these surrounding
land uses. Concerns with respect to noise has been raised in the
representations. There is no objection to the proposal from the
Environmental Health Service in relation to noise generated by the
proposed use. The applicant has indicated that the site would be
managed and monitored by the owner directly from his place of
residence which is adjacent to the application site. Management of the
site from either within or adjacent to the site is key to the acceptability of
the proposal to ensure that in the event that disturbance was to occur
from patrons, this could be immediately addressed. A site management
plan based on this arrangement is thus considered to be important to
controlling this development and is therefore included as a planning
condition. 
7.12 In further assessing residential amenity, the mutual overlooking of the
application site and the adjacent residential properties is limited, with the
former quarry site being situated significantly lower than the
neighbouring houses. This amenity aspect is also softened by the
vegetation present in the rear curtilages of the residential plot. There is
no overshadowing impact from the development; sunlight access for the
application site is reasonable despite the significant change in elevation
along the southern boundary. 
7.13 The principle of tourism accommodation at this location is therefore
supported by Local Development Plan policies and consideration of
surrounding land uses also supports their siting at this site. The use of
this brownfield site will also bring about a positive change to a site which
Page 8 of 14

Page 9

had lain abandoned for a long time. This is also supported by Local
Development Plan policies and national planning policies to support
sustainable development and reuse of land. 
Roads, access and parking
7.14 With respect to highway safety, the lodges will use Strowanswell Rd and
Glenpath for vehicle access, themselves connecting onto the A82 trunk
road. Four car parking spaces are shown within the application site. The
Roads Service offer no objection to the access via a short section of
private road or the parking arrangements within the site. Strowanswell
Road joins the A82 Trunk Road at a crossroads with Greenhead Road
and additionally, Transport Scotland offer no objections to the proposal. 
7.15 Concerns are raised in the objections regarding the use of nearby Core
Path and the possible impact of the proposal on it. The path in question
is remote from Strowanswell Road, outwith the site boundary of the
application and is situated at a significantly higher level. The proposal
will have no potential to impact upon the Core Path, but continued use
of the Core Path is safeguarded by condition. 
Ecology
7.16 The application site is on the edge of the established settlement and is
surrounded by developed woodland from the north and the east. Whilst
there are no ecological designations covering the site, a Local Nature
Conservation Site within the glen through which the Gruggies Burn flows
lies in very close proximity. Due to this, ecology is an important aspect
to be considered as a part of the appraisal of the proposal. A Preliminary
Ecological Assessment (PEA), was submitted in support of the
application and has since been reviewed by the Council’s Biodiversity
Officer. The PEA identifies various habitats were found within the study
area for a range of species including foraging bats, otter, red squirrel,
pine marten, badgers, reptiles and nesting birds although no field signs
were found. The Biodiversity Officer advised that she is content with the
findings of the report. The development will therefore not impact
unacceptably on both protected and non-protected species. The PEA
goes on to include a number of recommendations and enhancement
proposals which would provide further biodiversity benefit if included in
the project. The Biodiversity Officer therefore advises that Section 5.2
‘Recommendations’ of the report are conditioned into any decision
permitting the development. 
7.17 Concerns regarding tree removal, ecology and the PEA are highlighted
in the objections. It is acknowledged that the PEA is based on the
situation on site at the time of the survey and that vegetation clearance
works had been undertaken within the site prior to the submission of the
planning application. There was no planning restrictions, however, that
prevented the applicant from undertaking this work. No further clearance
works or tree removal is proposed as part of this application. However,
it is acknowledged that many of the trees around the periphery of the site
are growing out of the rock face and likely self-seeded. In terms of tree
Page 9 of 14

Page 10

management, the correct course of action in the future may be to remove
them. Nevertheless, future tree removal can be managed via a condition. 
Flooding and drainage
7.18 Turning to matters relating to with flooding and drainage, the assessment
is informed by the consultation response from the Council’s Roads
Service in their capacity as local flooding authority. It is advised in the
response that the application site is not within the flood risk area from
the nearby Gruggies Burn. No objection was raised in this response on
flood risk grounds either in respect of flood risk to the development itself,
or contribution to additional flood risk off site. No additional requirements
in respect of site drainage were highlighted. 
Ground conditions 
7.19 Environmental Health have offered no objection to the proposal but have
recommended as a minimum requirement a phase one desktop study,
conditioned into any planning decision. The purpose of this qualitative
(descriptive) assessment of risk and reconnaissance is to develop an
outline conceptual site model and identify all plausible contaminant-
pathway-receptor linkages at the site. If the findings of the desktop
indicate there is plausible risk to the end users of the site, then a site
investigation and risk assessment should be undertaken where the
preliminary risk assessment identifies any potential unacceptable risks
or to reduce uncertainty in the initial conceptual model.    
Other matters raised in representations
7.20 A wide range of other issues have been raised in the objections received.
Concern over the presence of the invasive species of Japanese
Knotweed and Giant Hogweed within the site and near the Barnhill Road
right of way and possible contamination of the nearby land  by the guests
are raised. The presence of Japanese Knotweed outwith the site
boundary has been noted in the PEA document; no presence of Giant
Hogweed has been noted either within or outwith the site. As the former
species’ presence is outwith the application site boundaries, it is not
within the scope of this planning application to control. 
7.21 Whilst concerns are highlighted in the objections in respect of waste
being present on site and pushed towards the rear of the site, it is
acknowledged that various items of waste had accumulated within the
site over the years and despite the applicant’s clearance works, some
remnants remain. No evidence was noted during site visits of any recent
ground works moving material within the site.   
7.22 A change in noise levels from the nearby trunk road due to the clearance
of trees is noted however any tree clearance was undertaken prior to
any planning application and thus not within scope of this application to
assess.  Concern regarding existing dog barking is highlighted, however
this is not a planning matter.  Access to Strowan’s Well via Strowanswell
Road is highlighted as a concern. During site visits, access to the path
Page 10 of 14

Page 11

leading to Strowan’s Well was maintained. Matters relating to
boundaries are not relevant to planning and instead are civil matters. 
7.23 Concerns regarding the possible future expansion of the business to
operate from the site are raised. The application assessment is based
on the submitted proposal and it would be inappropriate to speculatively
appraise possible future development of the site or change or material
increase in operations of the planned business. With regard to the timber
building situated outwith application site, adjacent to the house, the
applicant advises that this is provided for domestic purposes. Any
planning requirement is a matter separate from this application. Finally,
this application does not include any arrangement for the keeping of
livestock on the site and does not assess such.  It is understood that the
livestock are housed temporarily within the forward part of the site
pending the outcome of this planning application and the permanent
arrangements for housing the livestock will require to be subject of a
separate planning application in the near future. 
8.  CONCLUSION 
8.1 Overall, subject to the conditions below, it is considered that the proposal
is acceptable. The design and layout is acceptable both visually and in
respect of neighbouring amenity and the proposal will not have any
significant or adverse effects on the locality. The proposal is therefore in
accordance with reference to NPF4, the adopted West Dunbartonshire
Local Plan and the proposed West Dunbartonshire Local Development
Plan 2. Whilst the submitted objections are acknowledged, there are no
material planning considerations that suggest that planning permission
should not be granted subject to the conditions below. 
9.  CONDITIONS 
1) No individual shall reside in the approved tourist accommodation for
more than 28 consecutive days. In addition, no individuals shall reside
in the approved tourist accommodation for more than 60 days in the
calendar year. To this effect, a permanent log book shall be kept of all
visitors who stay at the tourist accommodation for the lifetime of the
development. This shall note the names and addresses of all of the
visitors. The log book shall be made available for the perusal of the
Council as Planning Authority if so requested. 
2) Prior to the lodges hereby approved being first brought into use the lodge 
operator shall submit a Management Plan to the Planning Authority for
their written approval. The Management Plan shall include details of day
to day site management and maintenance and how potential noise and
guest behaviour issues are to be dealt with should they arise. Thereafter,
the site will operate in accordance with the approved Management Plan
for the lifetime of the development unless otherwise agreed by the
Planning Authority 
Page 11 of 14

Page 12

3) Notwithstanding the approved drawing 02 - One Bedroom Lodge - Plan
& Elevations, details of the materials and finishes of the  two single-
bedroom lodges shall be submitted for the written approval of the
Planning Authority and shall be implemented as approved. 
4) The proposed car parking and access arrangements as shown on
drawing no. 02 rev C shall be formed and available prior to the lodges
hereby approved being first brought into use. The spaces and access
arrangements shall thereafter be kept available for the lifetime of the
development. 
5) Prior to the commencement of development, full details of the surface
and foul drainage shall be provided to the Planning Authority for written
approval. Thereafter, the approved arrangements shall implemented
prior to the lodges hereby approved being brought into use. The
drainage arrangements shall thereafter be maintained for the lifetime of
the development. For the avoidance of doubt, the arrangement will
incorporate sustainable drainage arrangements (SuDS). 
6) Notwithstanding the details shown on drawing no. 02 rev C with respect
to boundary planting and prior to the commencement of works on site,
full details of both hard and soft landscape works shall be submitted to
and approved in writing by the Planning Authority. Where appropriate
these details shall include proposed finished and existing ground levels
and contours, hard surfacing materials and lighting. Thereafter the
approved details shall be fully implemented in accordance with the
approved details within a timescale to be agreed by the Planning
Authority. Any trees, shrubs or hedges planted in accordance with this
condition which are removed, die, become severely damaged or become
seriously diseased within five years of planting shall be replaced within
the next planting season by trees, shrubs or hedging plants of similar
size and species to those originally required to be planted. 
7) No trees shall be lopped, topped, felled or otherwise removed from the
site without the prior written approval of the Planning Authority. The
recommendations made in Section 5.2 of the approved Preliminary
Ecological Report shall be implemented as approved. 
8) Notwithstanding the approved plans, public access to the path leading
to Strowan’s Well accessed from Strowanswell Rd shall be maintained
at all times unless otherwise agreed in writing by the Planning Authority.
9) (a) No development (other than investigative work) shall take place until
such time as a comprehensive site investigation has been carried out to
the appropriate Phase level and submitted to and approved in writing by
the Planning Authority. The investigation shall be completed by a
suitably qualified and competent person and completed in accordance
with advice given in the following:
Page 12 of 14

Page 13

• Planning Advice Note 33 (2000) and Part IIA of the Environmental   
Protection Act 1990 (as inserted  by section 57 of the Environment
Act 1995) 
• BS 10175:2011+A1:2013 – British Standards institution ‘The
Investigation of Potentially Contaminated Sites – Code of Practice’. 
• Land Contamination and Development Management - Guidance.
https://www.ep-scotland.org.uk/wp-
content/uploads/2019/09/ConLanDevGuide_12-Aug19-FINAL.pdf 
(b) If the Phase 1 investigation indicates any potential pollution
linkages, a Conceptual Site Model shall be formulated and these
linkages must be subjected to risk assessment. If a Phase 2 investigation
is required, then a risk assessment of all relevant pollution linkages will
require to be submitted. 
(c) If the risk assessment identifies any unacceptable risks then an
appraisal of remedial options followed by a detailed remediation scheme
will be submitted to and approved in writing by the Planning Authority.
No works other than investigative works shall be carried out on site prior
to receipt of the Planning Authority’s written approval of the remediation
scheme. 
10) Remediation of the site shall be carried out in accordance with the
approved remediation scheme prior to the proposed development being
brought into use. Any amendments to the approved remediation scheme
shall not be implemented unless approved in writing by the Planning
Authority. On completion of the remediation works, the developer shall
submit a verification report to the Planning Authority, confirming that the
works have been carried out in accordance with the approved
remediation scheme and that the works have successfully reduced the
risks to acceptable levels.
11) If the remediation plan requires it then a monitoring and maintenance
scheme (including the monitoring of the long-term effectiveness of the
proposed remediation) shall be submitted to and approved by the
Planning Authority. Any actions/measures ongoing shall be implemented
within an agreed timescale with the Planning Authority. Following
completion of the actions/measures identified in the approved
remediation scheme a further report which demonstrates the
effectiveness of the monitoring and maintenance measures shall be
submitted to and approved by the Planning Authority.
12) The presence of any previously un-encountered contamination that
becomes evident during the development of the site shall be reported to
the Planning Authority in writing within one week, and work on the
affected area shall cease. At this stage, if requested by the Planning
Authority, an investigation and risk assessment shall be undertaken and
an amended remediation scheme shall be submitted to and approved by
Page 13 of 14

Page 14

the Planning Authority prior to the recommencement of works in the
affected area. The approved details shall be implemented as approved.
13) If there is a requirement to either re-use site won material or to import
material then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and
approved by the Planning Authority prior to any material being re-used
or imported. In addition to this and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm shall also be free
from metals, plastic, wood, glass, tarmac, paper and odours. On
completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report
containing details of the source of the material and associated test
results to demonstrate its suitability for use. 
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 19th April 2023     
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Email: Pamela.Clifford@west-dunbarton.gov.uk 
Appendix:   Location Plan 
Background Papers: 
1. Application forms and plans
2. National Planning Framework 4
3. West Dunbartonshire Local Plan 2010
4. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
5. Consultation responses
6. Representations 
Wards affected: Ward 3 – Dumbarton 
Page 14 of 14