ARGYLL AND BUTE COUNCIL  COUNCIL 
DEVELOPMENT & ECONOMIC GROWTH  21st NOVEMBER 2024 
TIMELINE UPDATE: ARGYLL AND BUTE COUNCIL VISITOR LEVY 
1.0 INTRODUCTION 
1.1 The purpose of this paper is to provide members of Argyll and Bute Council
with an update on the pre-consultation preparatory work for the draft Argyll and
Bute Council Visitor Levy (VL) Scheme and to seek approval for the draft Argyll
and Bute Council VL Scheme and all associated paperwork to go out to a 12-
week public consultation period to be discussed at a Special Council meeting on
20th December, rather than at the full council meeting on 21st November 2024. 
1.2 The formal VL Guidance for local authorities was published in the public
domain on 4th October 2024. With reference to the guidance document, detail
statutory and non-statutory activity already undertaken by elected members,
council officers and members of the Shadow VL Forum, complete with a
revised timescale of ongoing preparatory consultation and engagement work, is
outlined in Table 1 in the report. 
1.3 The extended timescale will allow elected members on the VL Short Life
Working Group (SLWG), with input from council officers on the VL Officers’
Working Group and members of the Shadow VL Forum, to conclude the pre-
consultation activity and use the feedback to shape the draft Argyll and Bute
Council VL Scheme as appropriate for the 20th December 2024 meeting. 
2.0 RECOMMENDATIONS 
2.1 Members are asked to: 
• Note the content of this paper. 
• Endorse the requirement for the draft Argyll and Bute Council VL Scheme
and associated papers to be considered to go out to a 12-week public
consultation period in January to March 2025 at a Special Council meeting
on 20th December 2024 rather than on 21st November 2024.
.
3.0 DETAIL 
3.1  The main focus of this report is to seek more time to conclude the pre-
consultation preparatory work to develop a draft Argyll and Bute Council VL
Scheme, with associated paperwork, for consideration at a Special Council
meeting on Friday, 20th December 2024. The preparatory activity that has been
undertaken over recent weeks, particularly once in receipt of the VL Guidance is

Page 2

depicted in Table 1 of this report. This is an updated version of the Table 1
outlined in the Special Council paper on 15th August 2024. 
3.2 Given that the formal VL Guidance has been published, one material change is
that the formal consultation period has been amended to the 12-week
recommended timescale. It is important to align to the key requirements within the
VL Guidance, particularly those noted as statutory, to avoid the possibility of
having to restart the 18-month implementation period. 
3.3 As noted in Table 1, the pre-consultation survey closed on Monday, 28th October,
with 1,254 responses received. These responses will help to shape the draft
Argyll and Bute Council VL Scheme that will be issued for formal consultation in
January 2025, subject to council approval to this public consultation in December
2024. 
3.4 The feedback from the six VL stakeholder consultation sessions organised by
members of the Shadow VL Forum (Argyll and the Isles Tourism Co-operative
and VisitScotland) on 23rd and 30th (x2) October and 6th. 7th and 14th November
2024 will also shape the development of the VL Scheme, as appropriate. 
3.5 Argyll and Bute Council officers are working with professors from the University
of Edinburgh Business School to look at forecasting the potential level of Visitor
Levy income using a working rate figure of 5%. They worked with the City of
Edinburgh Council on their forecasts. The data available regarding
accommodation providers, their bed spaces and occupation rates is limited but
officers are confident robust estimates will be ready for inclusion in the draft VL
Scheme to go out to public consultation in January 2025, subject to council
approval to this public consultation in December 2024. 
3.6 The exact mechanism for billing and collecting the levy is still under discussion,
including the development of a national platform through discussions with the
Improvement Service. Argyll and Bute Council will ensure compliance, with
penalties and debt recovery processes in place for non-compliance.
Establishing a robust internal team for project management, enforcement, and
data analysis will be necessary to support the implementation of the VL and
any supporting systems. The proposed approach will be included in the 20th
December paper pack and further work will be required during the formal 18-
month implementation period.

Page 3

3.7 Table 1 below outlines an indicative timeline of activities for the establishing and implementing of a visitor levy including key
council meetings. The text in italics mirrors that in the VL Guidance document and statutory requirements are highlighted in
light blue. 
Table 1: Indicative Timeline of Activities to Establish a Visitor Levy (VL) aligned to the final VL Guidance Document
Indicative
Timeline
Activity Statutory
Requirement
Pre-consultation work
Ongoing Local authorities undertake work to understand their local visitor accommodation sector and set up necessary
cross working between local authority departments. 
VL Officers’ Working Group (OWG) established on 2nd July 2024 and meets fortnightly. Members of the VL OWG are
from key council functions, such as Economic Growth, Revenue and Benefits, Communication and Customer Services.
Argyll and Bute Council officers are working with professors from the University of Edinburgh Business School to look
at forecasting the potential level of VL income using a working levy rate of 5%. 
Ongoing Local authorities engage with stakeholders to develop visitor levy proposal. 
Shadow VL Forum is established: inaugural meeting on 7th October and a workshop session on 24th October. The next
meeting is scheduled for 14th (p.m.) November 2024
Members of the Shadow VL Forum (AITC and VS) have set up six VL stakeholder consultation sessions on 23rd and
30th (x2) October and 6th. 7th and 14th (a.m.) November 2024.
Pre-consultation survey issued on 11th October and closed on 28th October 2024, with 1,254 responses. 
Ongoing Discussion and debate at relevant local authority committees. 
VL SLWG (public meeting) established and chaired by the Council Leader. VL SLWG comprises of four members of the
Administration and two members from the Opposition. First meeting, 1st October and the next scheduled for 30th
October. Elected Members Seminar on the VL, attended by industry reps/Shadow Forum members from AITC and VS
on 16th October. VL paper approved at a Special Council meeting on 15th August 2024. 
Ongoing Local authorities to prepare for consultation.
Argyll and Bute Council web page went live on 9th October, https://www.argyll-bute.gov.uk/my-community/recreation-
and-leisure/argyll-and-bute-visitor-levy complete with an inbox Abvl@argyll-bute.gov.uk for questions and a link to
FAQs. An internal ChatBot is being developed to assist in fielding FAQs. 
Oct 2024 Objectives of VL Scheme to be developed. 
Aligned with the four strategic objectives/priorities within the Argyll and the Isles Strategic Tourism Partnership
Strategy. The objectives have been tweaked slightly at the Shadow VL Forum meeting on 24th October to mirror the
work already underway by the AISTP (five of which are Shadow VL Forum members) to prepare a revised strategy,
spring 2025.
√
Oct/Nov
2024
Impact studies to be carried out as required. 
Initial draft impact studies were considered at the VL SLWG meeting on 30th October 2024 and will be included in the
paper pack for the Special Council meeting on Friday, 20th December 2024.
√

Page 4

Table 1: Indicative Timeline of Visitor Levy (VL) Implementation Requirements (continued)
Indicative
Timeline
Activity Statutory
Requirement
Nov/Dec
2024
Develop draft VL Scheme to be proposed. 
Preparation of the draft Argyll and Bute Council VL Scheme is ongoing with key input from the VL SLWG and will be
informed by the results from the pre-consultation survey and VL stakeholder session discussions. A final draft VL
Scheme will be included in the paper pack for a proposed Special Argyll and Bute Council meeting in December 2024. 
Nov/Dec
2024
Plans for use of net proceeds of the draft VL Scheme to be developed.
Feedback sought in the pre-consultation survey and from the workshop session with the Shadow VL Forum (initial
summary included in the draft VL. Input and discussions at the VL SLWG for what is included in the draft Argyll and
Bute Council VL Scheme. 
Dec 2024 Agreement of draft VL Scheme by the local authority.
Draft Argyll and Bute Council VL Scheme, and all supporting documentation, to be considered to go out to public
consultation at a proposed Special Argyll and Bute Council on 20th December 2024 
Formal Consultation
January
to March
2025
Public consultation on entire draft Argyll and Bute Council VL Scheme proposal (standard practice is 12
weeks)
Timescale aligned to approval of a draft Argyll and Bute Council VL Scheme and associated documents to go out to
public consultation at a proposed Special Argyll and Bute Council meeting on 20th December 2024.
√
April 2025 Analyse and report findings on the local authority committee, including potential changes to the Argyll and
Bute Council draft VL Scheme in light of the consultation.
VL OWG analyse findings working with the VL SLWG and input from the Shadow VL Forum, as appropriate. 
Governance Requirements
May/June
2025
Formal public announcement of decision to introduce a visitor levy or not (include start date in early 2027).
Report to a Special Council meeting in May/June 2025 (dependent on response from the formal consultation to prepare
a final Argyll and Bute Council VL Scheme for approval).
√
June/July
2025
Minimum 18-month implementation report begins.
Official start date for 18-month period to be confirmed nearer the time.
√
June/July
2025
Scottish Ministers to be notified of decision to introduce a visitor levy across Argyll and Bute. √
June/July
2025
Establish a Visitor Levy Forum within six months of formal public announcement of a decision to introduce a
VL Scheme.
Augment current Shadow VL Forum to establish a the main VL Forum (advisory function) to be maintained for the
duration of the scheme (meet at least two times per calendar year).
√
Mid-July
2025
Argyll and Bute Council to advise businesses of their liability and prepared administration of Argyll and Bute
Council VL Scheme.

Page 5

Table 1: Indicative Timeline of Visitor Levy (VL) Implementation Requirements (continued)
Indicative
Timeline
Activity Statutory
Requirement
Governance Requirements
Dec/Jan
2027
Implementation period expires.  
Early
2027
The Argyll and Bute Council VL Scheme comes into force, and the VL is collected and remitted to Argyll and
Bute Council.
√
Early
2028
Annual report on the Argyll and Bute Council VL Scheme 
An annual report will go to a full Argyll and Bute Council meeting, where the paper will be in the public domain.
√
Source: VL Guidance and Officer Commentary

Page 6

4.0 CONCLUSION 
4.1  The purpose of this paper is to provide members of Argyll and Bute Council
with an update on the pre-consultation preparatory work for the draft Argyll and
Bute Council VL Scheme and to seek approval for the draft Argyll and Bute
Council VL Scheme and all associated paperwork to go out to a 12-week
consultation period in January 2025 at a Special Council meeting on Friday, 20th
December rather than Thursday, 21st November 2024. 
5.0 IMPLICATIONS 
5.1  Policy: the visitor levy has become law following Royal Assent of the Visitor
Levy (Scotland) Bill and the VL Guidance has been published. 
5.2  Financial: none. 
5.3  Legal: none. 
5.4  HR: the VL SLWG is supported by officers from the VL OWG and members of
the Shadow VL Forum. 
5.5  Fairer Scotland Duty: the Fairer Scotland Duty, Part 1 of the Equality Act 2010,
came into force in April 2018. The duty places a legal responsibility on
particular public bodies in Scotland, such as Argyll and Bute Council, to pay
due regard to (actively consider) how they can reduce inequalities of outcome,
caused by socio-economic disadvantage, when making strategic decisions and
how this has been implemented. 
5.5.1 Equalities: none. 
5.5.2 Socio-economic Duty: none.
5.5.3 Islands: the same visitor levy scheme, with the same percentage rate charged
for overnight accommodation, will cover the whole of Argyll and Bute, including
accommodation providers on the islands. It is anticipated that this nominal rate
will not disproportionately impact island accommodation providers any more
than those based on the mainland throughout the region. 
5.6  Climate Change: none. 
5.7  Risk: there is a risk that the Argyll and Bute Council does not implement the
visitor levy process in adherence to the Scottish Government timelines which
could delay implementation. 
5.8  Customer Service: there is a need to implement an efficient visitor levy process
that is transparent and easy to use by our customers.   
5.9 The Rights of the Child (UNCRC): none. 
Kirsty Flanagan, Executive Director responsible for Economic Growth 
Councillor Jim Lynch, Leader of Argyll and Bute Council

Page 7

7th November 2024 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
fergus.murray@argyll-bute.gov.uk 
Ishabel Bremner, Economic Growth Manager 
ishabel.bremner@argyll-bute.gov.uk