Democracy Spraffa

Item 7 Appendix 5

West Dunbartonshire Council · 16 November 2022
Back to Planning Committee — 16 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Local Development Plan 2
Green Network and Green Infrastructure Supplementary Guidance
November 2022
ITEM 7 - APPENDIX 5

Page 2

Status of this document
This document has been prepared as Supplementary
Guidance to the Local Development Plan (LDP2). It is a
material consideration in planning decisions, and will be
adopted as part of the development plan following the
adoption of LDP2.
This document is also available in other languages, large print
and audio format on request. Please contact Corporate
Communications at:
Address: West Dunbartonshire Council, Council Offices, 16
Church Street Dumbarton, G82 1QL 
Phone: 01389 737527 
Email: Communications@west-dunbarton.gov.uk
Arabic
Hindi
Punjabi
Urdu
Chinese (Cantonese)
Polish
British Sign Language
BSL users can contact us via contactSCOTLAND-BSL, the
on-line British Sign Language interpreting service. 
Find out more on the contactSCOTLAND website .

Page 3

Contents
Part 1 - West Dunbartonshire’s green network and green infrastructure .................... 3
Introduction ............................................................................................................. 3
What is open space ............................................................................................. 3
What is greenspace? ........................................................................................... 3
What is green infrastructure? ............................................................................... 4
What is a green network? .................................................................................... 4
What are the benefits of green networks and green infrastructure? .................... 4
Planning and the green network and green infrastructure ...................................... 5
Safeguarding the green network and green infrastructure ...................................... 6
Enhancing and expanding the green network ......................................................... 7
Part 2 – Green infrastructure delivery in new development ........................................ 8
Embedding the green network and green infrastructure ......................................... 8
Green infrastructure functions ................................................................................. 8
Green infrastructure function: water management ............................................... 9
Green infrastructure function: habitat enhancement ............................................ 9
Green infrastructure function: access networks ................................................... 9
Green infrastructure function: open space ........................................................... 9
The requirement for green infrastructure in different types of development .......... 10
Part 3 – Open space in new residential development .............................................. 12
Open space standards for residential development .............................................. 12
Accessibility standard ........................................................................................ 12
Quality standard ................................................................................................. 12
Quantity standard .............................................................................................. 13
How will these standards be used? ....................................................................... 14
On‐site provision for residential developments ..................................................... 15
Green infrastructure stewardship .......................................................................... 15
Part 4 – Developer contributions and green infrastructure projects .......................... 16
Legal and policy framework .................................................................................. 16
Developer contribution framework ........................................................................ 16
When will contributions be sought? ................................................................... 16
What will the contribution be? ............................................................................ 16

Page 4

2
How is the contribution calculated? ................................................................... 17
When will developer contributions be required to be paid? ................................ 18
Financial mechanisms ....................................................................................... 18
What projects will developer contributions be spent on? ................................... 18
Are there any circumstances when developer contributions will be reduced? ... 18
Monitoring ............................................................................................................. 19
Appendix 1: Developer’s flowchart ........................................................................... 20
Appendix 2: Green infrastructure checklist ............................................................... 21
Appendix 3: Developer contributions examples ....................................................... 22
Example 1 - using the quantity standard ............................................................... 22
Example 2 - using the quantity standard for small sites ........................................ 24
Example 3 - accessibility standard: on‐site provision or financial contribution ...... 26
Example 4 - using the quantity standard for large sites ........................................ 28
Example 5 - not all of the site is accessible........................................................... 31
Example 6 - looking at quality standards .............................................................. 33
Appendix 4: Information required to be provided in development appraisals ........... 35
Appendix 5: Open Space Audit information note ...................................................... 37

Page 5

Part 1 - West Dunbartonshire’s green network and green
infrastructure
Introduction
West Dunbartonshire has an outstanding natural environment, which has been
shaped by the area’s history, and defines West Dunbartonshire as a place today.
This environment is vital to future prosperity and the health and wellbeing of West
Dunbartonshire. The area boasts a wide variety of parks and gardens; play spaces
and sports areas; woodland; natural and semi‐natural green spaces; riverside and
canalside spaces; as well as the designed landscape at Overtoun House and
outstanding countryside such as the Kilpatrick Hills and the Muirs, which together
form a valuable and important green network.
The strategy of Local Development Plan 2 seeks to safeguard the existing green
network, and to ensure new development enhances and expands it by improving
existing green infrastructure assets, the connections between them and by creating
new multifunctional green infrastructure. As a result, the Local Development Plan
has been awarded the Building with Nature Award, which means that: 
1. the policies within the Plan ensure that green infrastructure is considered from
the outset of the development process, throughout its construction, and is
sustainably managed after the development has been completed; and
2. it demonstrates a whole lifecycle approach to green infrastructure which will
ensure development that comes forward delivers healthy, liveable and
sustainable communities within West Dunbartonshire.
The purpose of this Supplementary Guidance is to:
1. define the green network in West Dunbartonshire and identify its existing
assets and opportunities (Part 1);
2. outline the principles for embedding green infrastructure at the heart of new
development using a green infrastructure first approach (Part 2);
3. define the open space standards that will be required of new development
and how these standards will be achieved (Part 3); and
4. describe how developer contributions for green infrastructure associated with
new developments will be calculated (Part 4).
What is open space
Open space is space within and on the edge of settlements comprising green space
and civic areas such as squares, market places and other paved or hard landscaped
areas with a civic function.
What is greenspace?
Greenspace is space which provides a recreational function, an amenity function, or
aesthetic value to the public such as areas of: grass, trees, other vegetation, water,
but not including agricultural or horticultural land.

Page 6

What is green infrastructure?
Green infrastructure is features or spaces within the natural and built environments
that provide a range of ecosystem services.
What is a green network?
The green network is connected areas of green infrastructure and open space that
together form an integrated and multi-functional network.
GREEN NETWORKS
are connected areas of
green infrastructure that
together form an
integrated and multi-
functional network.
GREENSPACE
is space which
provides a
recreational function,
an amenity function,
or aesthetic value to
the public such as
areas of: grass, trees,
other vegetation,
water, but not
including agricultural
or horticultural land.
+ CONNECTION
+ INTEGRATION
+ MULTI-
FUNCTIONALITY
GREEN
INFRASTRUCTURE
Features or spaces
within the natural and
built environments
that provide a
range of ecosystem
services.
+ DESIGN
+ MANAGEMENT
+ FUNCTIONALITY
Figure 1  The relationship between greenspace, green infrastructure and the green network
What are the benefits of green networks and green infrastructure?
Green networks and green infrastructure can provide a range of beneficial outcomes,
including economic; environmental; climatic; mental and physical health; and social
improvements.
Greenspace, green infrastructure and the green network have a number of benefits:
GREENSPACE
is any vegetated land
or structure, water,
path or geological
feature within and
on the edges of
settlements.
+DESIGN
+MANAGEMENT
+FUNCTIONALITY
GREEN
INFRASTRUCTURE
is greenspace which
is designed and/or
managed to provide
identified functions.
+CONNECTION
+INTEGRATION
+MULTI-
FUNCTIONALITY
GREEN NETWORKS
are connected areas
of green
infrastructure that
together form an
integrated and multi-
functional network.

Page 7

• habitats for biodiversity;
• off-road active travel and recreation routes;
• locations for sport and recreation;
• areas for the management of water; and
• defining distinctive, healthy, sustainable and attractive places in which to
live, work, visit and enjoy.
The Scottish Government’s Green Infrastructure: Design and Placemaking (2011)
provides more detail on the benefits that green networks and green infrastructure
can have as well as how green infrastructure can deliver the six qualities of
successful places; welcoming, distinctive, safe and pleasant, easy to move around,
resource efficient and adaptable.1 
These assets become more valuable when they are designed and managed to be:
• multi‐‐‐‐functional, thereby delivering more than one benefit;
• integrated into where people live and other urban infrastructure; and
• connected to other areas of green infrastructure, thereby providing off-road
routes for people and habitat corridors for wildlife to move around.
Planning and the green network and green infrastructure
The planning system is a key mechanism for delivering the green network, and the
green network can help deliver the outcomes, particularly with regard to improving
health and wellbeing, meeting climate change targets, placemaking and securing
positive effects for biodiversity.
Local Development Plan 2 establishes a strategy and policies for the protection,
enhancement and expansion of the green network and green infrastructure. The
strategy of the Plan seeks to safeguard and where possible ensure that development
enhances and expands both of these important resources.
Local Development Plan 2 identifies the Strategic Green Network as a Key Asset
that the Council wants to see protected and enhanced. The key corridors and assets
which make up the Strategic Green Network are highlighted in the Local
Development Plan 2 Strategic Green Network Map.  Strategic Green Network
Projects that are considered necessary in order to strengthen West Dunbartonshire’s
contribution to the Central Scotland Green Network are identified on the Strategic
Green Network Projects map, Figure 2. This illustrates how West Dunbartonshire’s
green network will: be integrated through the urban areas of the Vale of Leven
corridor and the Clyde Waterfront; provide connections for people to the Kilpatrick
and Carman Hills; span the Vale of Leven to provide wildlife corridors.
1 http://www.gov.scot/Publications/2011/11/04140525/5

Page 8

Figure 2.  A spatial strategy for West Dunbartonshire’s green network
The Local Development Plan 2 strategy for the green network is to (1) safeguard the
existing green network; and (2) ensure new development enhances and expands the
green network by creating new multifunctional green and open spaces, and
improving existing green network assets and the connections between them.
Safeguarding the green network and green infrastructure 
Local Development Plan 2 seeks to safeguard the green network through a series of
Policies, as detailed below:
1. Policy KH 1 seeks to protect and enhance the Kilpatrick Hills Local Landscape
Area;
2. Policy GI1 seeks to ensure that safeguarded open space and outdoor sports
facilities are protected;
3. Policy ENV 1 seeks to conserve, protect and where appropriate, enhance,
European and National designated sites;
4. Policy ENV 2 seeks to protect the landscape character of West
Dunbartonshire;
5. Policy ENV 3 protecting carbon rich soils through the area;
6. Policy ENV 4 protects Forestry, Trees and Woodlands;
7. Policy ENV 5 seeks to protect and, where appropriate, enhance the water
environment;
8. Policy ENV 6 seeks to avoid development on floodplains and to ensure that
flood risk is avoided elsewhere; and
9. Policy CON 3 protects Core Paths and Natural Routes.

Page 9

Enhancing and expanding the green network
Local Development Plan 2 seeks to enhance and expand the green network through
the following policies:
1. Policy CP1 seeks to ensure new development creates successful, sustainable
places
2. Policy CP2 requires developments to deliver green infrastructure that
contributes to the development and enhancement of a multi-functional green
network
3. Policy GI2 which requires new developments to meet open space standards.
4. Policy GI3 which encourages the provision of allotments and community
gardens
5. Policy GI4 which establishes a framework for the provision of developer
contributions towards green infrastructure.

Page 10

Part 2 – Green infrastructure delivery in new development
Embedding the green network and green infrastructure
In order to safeguard, enhance and expand the green network and green
infrastructure, development proposals are required to:
1. Protect the existing green network: Green infrastructure and open spaces
which currently exist on a site should be protected unless there is adequate
mitigation which enhances the quality of the network elsewhere providing an
overall net gain in quantitative or qualitative provision.
2. Understand the wider green network: It is vital that development proposals
look beyond the boundaries of individual sites, however large or small, to
consider the broader spatial context and create a more coordinated and
joined-up network.
3. Integrate green infrastructure into the design process for all
development proposals: The greatest green network benefits can be
achieved if green infrastructure is considered integral to the development
design process and considered early, rather than an afterthought once other
elements have become ‘fixed’.
4. Create new green infrastructure as part of the development: Where
development increases the number of people who would use and derive
benefit from the green network, proposals should seek to extend the network
through the creation of new green and open spaces which have designed
functions for a range of users.
5. Enhance the functionality and biodiversity value of existing assets: The
site appraisal and design process should identify opportunities to enhance the
value of existing assets.
6. Link to the existing network: Green infrastructure and path connections on
new sites should link up with the existing green network where possible.
7. Contribute financially towards off‐ff‐ff‐ff‐site projects:  In some instances the
best way of achieving green network enhancement will be by making a
financial contribution to projects beyond a site’s boundary, for example
upgrading a local play park or path network. Part 4 outlines the circumstance
and level of contribution that may be required.
8. Look long-term towards future management and maintenance.  How
green infrastructure and open spaces will be sustained should be considered
from the outset. Without careful consideration being given to future
management and maintenance of assets the range of benefits will reduce
quickly over time.
Green infrastructure functions
Policy CP 2 of Local Development Plan 2 sets out how the different functions of
green infrastructure should be integrated within developments. These functions are
water management, habitat enhancement, access and open space. The integration
of these functions within the design and layout of the development is necessary in
order to ensure that the development ensures a whole life approach to green

Page 11

infrastructure provision and links into and contributes to the wider green network.
Taking a green infrastructure first approach to integrating these functions within the
development, will help to create a sustainable, well managed and healthy,
biodiversity rich, green place, which helps to contribute to fit and active communities. 
Green infrastructure function: water management 
The Water Environment (Controlled Activities) (Scotland) Regulations 2011 requires
all surface water from new development to be treated by a sustainable drainage
system (SuDS) before it is discharged into the water environment, except for single
houses or where the discharge will be into coastal water.
SuDS help to protect water quality and reduce potential for flood risk by facilitating
natural drainage of surface water run‐off (including roof water). They encourage
infiltration and attenuation to prevent and reduce pollution from diffuse urban
sources and release capacity in water management infrastructure. 
However, not all SuDS systems deliver a range of multiple benefits as envisaged by
the Integrated Green Infrastructure (IGI) approach.  SuDS should be designed and
constructed to be multi‐functional green infrastructure elements, providing visual
interest, recreational amenity and biodiversity value.
Green infrastructure function: habitat enhancement
Many sites will have opportunities to create/enhance habitats and habitat nature
networks, create connections between those habitats and networks or enhance the
biodiversity of the site through specific planting and design. 
Proposals for new development should must consider whether the site can protect or
enhance habitats to safeguard existing networks or deliver new habitat to connect
fragmented networks. This work should be informed by appropriate surveys and
assessment. guided by tThe Green Network Blueprint developed by the Glasgow
and Clyde Valley Green Network Partnership can provide strategic guidance on,
which details existing habitats critical to the wider network and where connections
should be made to improve habitat connectivity.
Green infrastructure function: access networks
A successful green network needs to have good multi-user connections between
the different open spaces and facilities, such as shops and schools, which exist in and
around our settlements. New development has a role to play in this by ensuring that
sites connect to the existing green network.
When appraising the access potential for a site, consideration should be given to what
opportunities exist within the site, including how houses will link with open space and
facilities using safe, off-road Green Active Travel routes, and what opportunities exist
to provide multi-use connections with existing access networks outwith the site.
Proposals for new development should consider whether the site can protect or
enhance existing assets or deliver new Green Active Travel infrastructure to address
identified gaps.
Green infrastructure function: open space
This is covered in greater detail in Part 3.

Page 12

The requirement for green infrastructure in different types of
development
Not all forms of development will have to contribute directly or indirectly to open
space provision.  The level of contribution expected will be proportionate to the scale
and impact of that development on the green network.  Developments with the
greatest impact are those that increase user demands on the green network i.e.
residential uses.  Table 1 sets out these requirements and there is a flow chart in
Appendix 1 which provides a quick guide to the expectations for provision of open
space.
Residential development
(units)
New commercial or
industrial
development
TYPES OF
PROVISION
1-9 10-49 50+
Layout to include
landscaping and
setting
   
Green and Open
Spaces incl. play
spaces and
equipped areas
   
Access Networks
e.g. walkable link to
green network
   
Water Management
e.g. SUDS
   
Habitat
NetworksProvision/
Enhancement
e.g. biodiversity
   
Off-site
contribution/delivery
   
 not required
 required where need/opportunity identified
 required
Table 1 Matrix of types of development and indicative green infrastructure
requirements
New build commercial and industrial developments should comply with the principles
of good design set out in Policies CP1 and CP 2 of Local Development Plan 2 and
the Creating Places Supplementary Guidance, and look for opportunities to provide
amenity space, access links, SUDS and enhance biodiversity through planting.

Page 13

All residential development is expected to enhance the green network and applicants
should fully explore all opportunities for doing so at the outset of masterplanning and
site design. The requirements for green infrastructure associated with residential
development are based on an assessment of need and opportunity using the
estimated population size of the development and the standards of accessibility,
quality and quantity. The green network requirements for each individual site will be
discussed and agreed at pre‐ application stage.
Design guidance for integrating green infrastructure into new development is set out
in the Creating Places Supplementary Guidance.
Appendix 2 provides a checklist for ensuring the principles and functions set out
above have been considered within development proposals.

Page 14

Part 3 – Open space in new residential development
Open space standards for residential development
In order to create a valued green network within West Dunbartonshire each
component of the green network has to be “fit for purpose”, in other words, it is in a
condition that can support its intended purpose and function.  Three key standards
are used to determine whether a component is “fit for purpose”. These are
1. Accessibility
2. Quality; and
3. Quantity
These standards will be used to:
1. inform developers what the minimum requirements are for their sites;
2. prioritise works to provide/enhance facilities;
3. identify areas where open spaces are not fit for purpose; and
4. identify where there is a deficit in provision
Accessibility standard
This is the principle standard and sets a threshold for how close people should live to
their nearest publicly usable open space. The Council is keen to ensure that the
distance to open spaces takes into account the walking abilities of children and older
people. It is assumed that a child would be able to walk 250m in approximately 5
minutes and this distance defines the standard. The priority is to ensure that people
have easy access to multi‐purpose and good quality spaces that meet their needs.
The accessibility standard is:
When carrying out a site appraisal, developers should assess the distance of usable,
good quality open space, including the type, relative to the site being considered,
and this assessment should be provided in plan form. The distances should not be
“as the crow flies” but based on a network analysis using streets, paths and access
points to open spaces and highlighting barriers to those spaces. 
This assessment will inform what type of space, if any, is required within the
development, and its preferred location, or if a financial contribution to an existing
space is more appropriate.
Small, single use spaces such as stand-alone play areas should not be considered
as part of this assessment.
Quality standard
The quality of an open space is an assessment‐derived score based on work
undertaken as part of the Open Space Audit carried out in 2016 and updated in 2018
Everyone will live within a 250m walk of a 0.2ha usable
and good quality greenspace which meets the quality
standard

Page 15

to reflect changes to some spaces (see Appendix 5). It measures the quality of
spaces against a set of criteria relating to the site’s management, usability,
biodiversity, accessibility and infrastructure.  The quality measure has two main
uses: 
1. to identify where investment is needed in existing spaces
2. to ensure that new spaces meet/exceed the quality standard.
The quality standard is:
Where a space is identified as being below the Threshold Score, this indicates the
quality of that space is below standard and requires investment, and cannot in its
current condition count towards open space provision for the development site. All
new provision should exceed the threshold scores in Table 2 and should have
management and maintenance mechanisms and funding in place to ensure that the
quality is maintained into the future. The quality assessment for existing spaces will
be used to inform what enhancements are required if it falls below the threshold.
Open space typology Quality standard
threshold score
Parks and gardens 69%
Residential amenity greenspace 60%
Natural/semi-natural greenspaces 55%
Play space 50%
Table 2 - Quality standards for greenspace types
Quantity standard
The quantity standard is the amount of open space required per person. For West
Dunbartonshire the standard for new developments is as follows: 
Development sites should provide this quantity of open space as a minimum where
the accessibility standard and quality standard identifies a need based on an
analysis of open space provision for the wider area.  The range and mix of open
space within a development should reflect the findings of the site and wider context
appraisal, but would normally include formal open space such as a park, multi-
All publicly usable open spaces should meet or exceed the
threshold score set out in Table 2
Following reference to the accessibility and quality standard, where
provision is required,All new housing developments should provide
access to 30m2 of publicly useable open space per person.

Page 16

functional amenity greenspace, formal and informal play space, natural/semi‐natural
greenspace and green corridors. Incidental greenspace and landscaping will not
count to towards the quantity standard. Developers should provide a site plan
indicating which spaces comprise provision of open space. Play areas must include
accessible play equipment so that they may be enjoyed by users of all abilities.
The projected population of any development is calculated using the number of
bedrooms.  Developers should use Table 3 to work out the average occupancy for
their site.  Appendix 3 provides worked examples of how this is done. 
Dwelling
Size
Household
size
Quantity of Open
Space
1 bed 1.3 39m2 (30 x 1.3)
2 bed 1.9 57m2 (30 x 1.9)
3 bed 2.5 75m2 (30 x 2.5)
4 bed 3.0 90m2 (30 x 3.0)
5 bed 3.3 99m2 (30 x 3.3)
Table 3 Average household occupancy based on Scottish Household Survey
(2013)
The provision of public open space does not preclude or replace the need for private
garden/amenity areas that are commensurate with the needs of the type and size of
properties.
How will these standards be used?
Accessibility, quality and quantity standards will be used to inform provision of open
space for new development in West Dunbartonshire.  
Developers will need to demonstrate that the open space they propose in relation to
a development site is based on an assessment of these measures. 
Accessibility is a key objective for the Council so even if a development site is in an
area which has a good general provision of open space, if these are not readily
accessible from the site i.e. within 250m, then provision on-site will have to be made
or works carried out to improve accessibility e.g. new footpath connection.

Page 17

On‐‐‐‐site provision for residential developments 
Green infrastructure should be designed into the proposal at an early stage in the
process and the open space standards of accessibility, quality and quantity used to
determine what level of on‐site provision there should be. Design Statements should
record the appraisal carried out of the existing green network and set out justification
for the level of provision.
There is an expectation that major residential developments provide an equipped
play area if there is not adequate provision within 250m. Equipped play areas, must
include accessible play equipment so that they can be enjoyed by users of all
abilities. For some residential sites it will not be appropriate to form play spaces or
equipped play areas and instead a financial contribution is expected.
Policy GI4 and Part 4 of this Guidance sets out the circumstances under which off-
site provision or a financial contribution to enhance the green network may be
appropriate. In these cases, where off-site provision is acceptable, a hybrid approach
may be appropriate if part of the open space requirement can be met on-site with a
contribution towards meeting the rest of the requirement off-site, may be appropriate.
Green infrastructure stewardship
Well‐designed green infrastructure should continue to deliver multiple benefits into
the future. Consideration as to how the various features of the green network will be
maintained will ensure that it remains ‘fit for purpose'.
Just as ‘grey infrastructure’ elements, such as roads and drains, require ongoing
maintenance, so does green infrastructure. Many of the problems associated with
the quality of existing open spaces reflect the lack of initial consideration given to
funding and management mechanisms for effective long term management of green
infrastructure. Good stewardship ensuring the long-term quality of green
infrastructure is vital to a well‐ functioning green network.
Partnership working and agreements between public agencies and other
organisations may be necessary to recognise the multi‐functional nature of the green
infrastructure and ensure that resources that would otherwise be spent on ‘grey'
infrastructure are allocated to the effective management of the green infrastructure.
Applicants should demonstrate how their design proposals will be sustainably
managed over the long‐ term including financial models for future funding of
appropriate management and maintenance.
Planning conditions and legal agreements may be used to ensure that new
developments provide details of the ongoing maintenance of sites. There are
different options for management and maintenance depending on the tenure and
nature of the site. For private housing, the preferred method is a requirement for
maintenance and management of all common areas through a factor to form part of
the land title for all owners of a site. Registered Social Landlords will have to provide
evidence of a regular maintenance contract.

Page 18

Part 4 – Developer contributions and green infrastructure projects
This section provides further information and guidance on Policy GI4 of Local
Development Plan 2 and the Council’s requirements for development contributions
for green infrastructure. 
Legal and policy framework
This Supplementary Guidance has been prepared within the context of the following:
1. Town & Country Planning (Scotland) Act 1997 (as amended);
2. Local Government (Scotland) Act 1973
3. Town and Country Planning (Development Planning) (Scotland) Regulations
2008;
4. Circular 3/2012: Planning Obligations and Good Neighbour Agreements; and;
5. West Dunbartonshire Local Development Plan 2.
Developer contribution framework
The requirement for a developer to make an appropriate development contribution,
where the circumstances set out in Policy GI4 arise, is mandatory and will be treated
as a material consideration in the assessment and determination of planning
applications for residential development.
As a result, the Council has established a framework of how developer contributions
are collected and how they will be monitored annually, which is described in the
monitoring section below. 
In addition to any contributions made under Policy GI4 and this Supplementary
Guidance, developers will require to meet the costs of providing the service
infrastructure necessary for their development.
When will contributions be sought?
Contributions will be sought in line with the circumstances set out in Policy GI4 of
Local Development Plan 2. These are:
1. Smaller sites of less than 10 units where provision of on-site recreational
green infrastructure is not possible.
2. Developments where meeting the green infrastructure standards for on-site
provision is not appropriate, e.g. high density urban areas
3. Where a development site is accessible to open spaces but those spaces are
of a poor quality; and
4. Where development sites are accessible to good quality open spaces but a
contribution to the green network is required to enhance its provision to the
Central Scotland Green Network.
What will the contribution be?
The West Dunbartonshire standard for the required quantity of greenspace is 30m2
per person. 
The contribution for financial year 2022/23 is £30 for every m² of open space
required for the site. This figure is based on what it would cost to provide a facility

Page 19

2,000 m² (0.2ha) in size which includes a small play park, kick‐about area,
biodiversity area and path connection. Excluding land costs, this would be in the
region of £60,000.
As the costs of developing and implementing green infrastructure projects will
increase over time, it is considered prudent and necessary that project costs are kept
in line with the rate of inflation. Therefore, this guidance stipulates that project costs
are index linked and that costs are revised on 1st April each year using the General
Building Cost Index (GBCI) to reflect the increased project costs as they arise. If the
GBCI falls then developer contributions will remain at the same rate as in the
previous year
How is the contribution calculated?
To calculate the contribution the first step is to work out how much open space would
be required for the site using the quantity standard and estimated site population. 
The projected population of any development is calculated using the number of
bedrooms, which is based on data from 2013 extrapolated from the 2010 Census.
Developers should use Table 4 to work out the occupancy for their site. Appendix 3
provides worked examples of how this is done.
Table 4 – Open space standards for residential development
The contribution is calculated by totalling the amount of greenspace required across
the site based on number and dwelling size of units. That is then multiplied by £30
per sq. metre (2022/23). For example, if there are 25 x 2 bed dwellings and 30 x 3
bed dwellings then the calculation would be:
Total open space provision = 25 x 57m2 = 1,425
+ 30 x 75m2 = 2,250
= 3,675 sq. metres
Developer contribution calculation = 3,675 x £30 = £110,250
Dwelling size Household size Quantity of greenspace to be
provided per house
1 bed 1.3 39 m²  (30 x 1.3)
2 bed 1.9 57 m² (30 x 1.9)
3 bed 2.5 75 m²  (30 x 2.5)
4 bed 3.0 90 m²  (30 x 3.0)
5 bed 3.3 99 m²  (30 x 3.3)

Page 20

When will developer contributions be required to be paid?
The Council will require developers to make their developer contributions to the
Council prior to planning consent being issued, unless the payment of the
contributions is determined through a Section 75 or other agreement agreed
between the Council and the developer, which specifies a different payment
schedule or date for the contributions to be made. 
Financial mechanisms
In most cases, developer contributions will be delivered through either a Section 75
or Section 69 agreement.  In some cases it may be deemed that these mechanisms
are not required or appropriate, and payment may be made up front, prior to
planning consent being issued.
Where it has been agreed that payment will not be made at the time of concluding
the legal agreement, i.e. where phased payments have been agreed, the sums
involved will be index linked to the General Building Cost Index (GBCI). However, if
the GBCI falls then developer contributions will continue at the same rate as in the
previous period. In certain instances, the party to the agreement may also be
required to guarantee the availability of funds, for example through a bond with a
bank or insurance company in order to prevent any default in payment through
bankruptcy, liquidation or refusal to pay. Late payments may also incur interest
charges, which will be calculated at 5% per annum above the base rate of the Bank
of England.
What projects will developer contributions be spent on?
The Council will publish a schedule of general and specific projects that developer
contributions will be used towards. This will be updated annually. 
Are there any circumstances when developer contributions will be reduced?
Policy GI4 states that contributions sought under this policy will be waived or
reduced only in exceptional circumstances – for example, where a developer
demonstrates that their development would have exceptional development costs
and/or overriding economic, social or other benefits. 
Where it can be demonstrated that paying the full contribution would make a
development unviable, developers may be permitted to negotiate a reduced
contribution. 
In such cases, developers will be required to submit a full development appraisal,
including costs, on an open book basis, to the Council for consideration. For
verification purposes, the Council may seek an assessment of the submitted
appraisal from the District Valuer or other mutually agreed independent valuation
surveyor at cost of the developer/applicant.
Appendix 4 of this Supplementary Guidance provides further advice on the level of
information that will be required in the development appraisal and how this will be
assessed by the Council. 
In addition to developers being able to negotiate reduced contributions, the Council
also provides flexible methods of developer contribution payments. Consequently,

Page 21

developers may be able to enter into an agreement with the Council in order to
arrange for the payment of developer contributions at a later stage in the
development process. This allows flexibility to meet changes in the wider economy.
Monitoring
The Council has an agreed system for collecting, distributing and monitoring
developer contributions which was approved by Planning Committee on 6th
September 2017.
The Development Planning and Place Team, in conjunction with the Council’s
Finance Service, monitor the Developer Contributions fund for auditing and project
management purposes. 
A monitoring report will be presented to Planning Committee on an annual basis
which updates the committee on:
1. the amount of developer contributions received;
2. which projects have been undertaken and the total cost for each project;
3. the remaining developer contributions held by the Council; and
4. the general and specific projects that the contributions will be used towards.
The time period in which developer contributions must be spent within is 10 years
from the grant of planning consent and/or when the development contribution has
been paid to the Council, whichever is later. This length of time is considered
appropriate because of the length of time some developments take to complete and
because, in some instances, contributions will be towards larger green infrastructure
projects which will be funded from a variety of sources. Should the contribution not
be spent in this timeframe, unless there has been exceptional circumstances, the
money will be returned to the applicant including the interest that has been accrued
on the contribution.

Page 22

Appendix 1: Developer’s flowchart
Major residential developments (50 units or more) will be required to provide on-site play equipment if there is not an equipped play
area with 250m of the site.
** If a residential development site meets the quantity standard through on-site provision, no financial contribution to the green
network is required.

Page 23

Appendix 2: Green infrastructure checklist
Green Infrastructure Planning Policy Compliance

Page 24

Appendix 3: Developer contributions examples
Example 1 - using the quantity standard
A residential site proposes a mixed development of 80 units comprising flats, terraced, semi‐detached and detached properties.
There are two blocks of 12 flats consisting of 6 1‐bed and 18 2‐bed flats. There are 56 houses comprising a mix of eight 2‐bed
terraced houses, thirty 3‐bed semi‐detached houses and eighteen 4‐bed detached properties. What is the expected occupancy and
what should the minimum open space provision be?
STEP 1 – Work out the number of bedrooms
Unit Type Number of Units
1 Bed 6
2 Bed 26
3 Bed 30
4 Bed 18
TOTAL 80
STEP 2 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 6 234
2 1.9 57 26 1482
3 2.5 75 30 2250
4 3 90 28 2520

Page 25

Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
5 3.3 99 0 0
Total 80 6486
STEP 3 – Add the open space provisions together to get the total open space required which would be in this case 6,486 sq.m
This is the amount of open space to be provided for a development proposal of this size. The form of this needs to be determined
using the site appraisal method. For example, in a situation whereby the site is not within 250 metres walk of a 0.2ha usable
greenspace, then 6,486 sq.m
Developer flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? No
On-site provision should be based on the quantity and quality standards for residential development. Financial contributions for
all/part will be considered in some cases

Page 26

Example 2 - using the quantity standard for small sites
A small housing opportunity site proposes a block of four one‐bed flats. What is the expected occupancy rate and the minimum
open space provision?
STEP 1 – Work out the number of bedrooms
Unit Type Number of Units
1 Bed 4
2 Bed 0
3 Bed 0
4 Bed 0
TOTAL 4
STEP 2 - Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 4 156
Total 4 156
STEP 3 – 156 sq.m is the amount of open space to be provided. However, as per the Developer’s Flowchart (Appendix 1), as it is a
small site of less than ten units and therefore requires a financial contribution to be provided instead of providing on‐site.
STEP 4 – Multiply the open space provision by financial contribution rate of £30 per sq.m 156 sq.m x £30 = £4,680
Developer flowchart analysis
Is the proposal for 10 or more units? – No

Page 27

A financial contribution, based on the quantity standard, for the wider Green network will be required.

Page 28

Example 3 - accessibility standard: on‐‐‐‐site provision or financial contribution
The development site is a gap site within a built up area. It is 0.41ha in size and the proposal is to build a single block of flats. There
is a mix of 15 one‐bed and 30 two‐bed flats. What would the developer be required to provide?
STEP 1 – Using the flow chart in Appendix 1, the proposal is for more than ten units so the first step is to see if it meets the
accessibility standard i.e. is it within 250m of a 0.2ha space? The site is in an urban area where a high density development is
supported. The applicant has made a case for making a financial contribution to upgrade play equipment in a large park less than
250m walking distance from the development site. It is agreed that off‐site provision is more appropriate in this instance so the
contribution needs to be calculated.
STEP 2 - Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 15 585
2 1.9 57 30 1710
Total 45 2,295
STEP 3 – To get the total amount of open space required, add together the open space provision 585 +1710 = 2,295 sq.m. This is
the amount of open space to be provided. 
The site is in an urban area where a high density development is supported. The applicant has made a case for making a financial
contribution to upgrade play equipment in a large park less than 400m walking distance. It is agreed that off‐site provision is more
appropriate in this instance so the contribution needs to be calculated.

Page 29

STEP 4 – Multiply the open space provision by financial contribution rate of £30 per sq.m, i.e. 2,295 sq.m x £30 = £68,850.
Therefore for this site a financial contribution of £68,850 required to upgrade play equipment in the park.
Developer flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? Yes
Does the quality of those spaces meet the quality standard? No, the play equipment is sub-standard
A financial contribution, based on quantity standard, to enhance off-site provision will be required.

Page 30

Example 4 - using the quantity standard for large sites
A large housing development is proposed for a greenfield site (5.15ha). It is close to an existing woodland and a path network
which leads into the wider countryside. There are 115 dwellings proposed for the site, a mixed of detached, semi‐detached and
terraced properties. What would the developer be required to provide?
House size Number
of units
1-bed terraced 12
2-bed semi-detached 18
3-bed semi-detached 30
3-bed detached 25
4-bed detached 30
STEP 1 ‐ Using the flow chart in Appendix 1, the proposal is for more than ten units so the first step is to see if it meets the
accessibility standard i.e. is the site within 250m of a 0.2ha amenity greenspace, play space or natural/ semi‐natural greenspace?
The site is within 250m of a large natural/semi‐natural greenspace provided path links are made to connect into these areas from
the site. In addition, there is an expectation that major residential developments provide an equipped play area if they are not within
250m of one. The site appraisal identifies that there are no equipped play areas nearby. To meet the standards the site could
combine provision i.e. have on‐site provision and make an off‐site contribution to make the woodland accessible.
STEP 2 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 12 468
2 1.9 57 18 1026

Page 31

Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
3 2.5 75 55 4125
4 3 90 30 2700
Total 115 8319
STEP 3 – To get the total amount of open space required, add together the open space provision 468+1026+4125+2700 = 8319
sq.m. This is the amount of open space to be provided.
This is the total amount of open space required based on the estimated population of the development. To provide on‐site and
make an off‐site contribution this figure is split: a 0.2ha (2000sq.m) equipped play space will be provided within the site and the
remainder will be a financial contribution to enhance access to and within the woodlands.
STEP 4 – The off‐site financial contribution to enhance access to and within the woodlands will be less the area of the equipped
play space i.e. 
8,319 sq.m – 2,000sq.m = 6,319sq.m 
£30 x 6,319 sq.m = £189,570
The provision responds to the site context.
Developer flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? Yes, but only if access improvements are
implemented

Page 32

In this instance, the on-site provision of play equipment is required as it is a major development. This provision is subtracted from
the overall quantity provision required, with the balance of provision met through a financial contribution to enhance access to and
within the nearby woodlands.

Page 33

Example 5 - not all of the site is accessible
A large housing development is proposed on a long, narrow site with the railway adjacent to the southern boundary. There are 104
dwellings proposed on the 2.8ha site: a mix of detached, semi‐detached, terraced and flatted properties. What would the developer
be required to provide?
STEP 1 ‐ The proposal is for more than ten units so the first step is to see if it meets the accessibility standard i.e. is it within 250m
of a 0.2ha of a useable park, amenity greenspace, play space or natural/semi‐natural greenspace? The site is within 250m of a
large park and recreation ground which is in need of an upgrade. However the railway separates the site from the park so that the
walking distance is greater than 250m for most of the site except the flatted properties to the west. Improving connections by
building a bridge is too expensive so some on‐site provision is required. There is an expectation that major residential
developments provide an equipped play area.
STEP 2 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 24 936
2 1.9 57 26 1482
3 2.5 75 38 2850
4 3 90 16 1440
Total 104 6708
STEP 3 – All the 1 bed flats (24) are within 250m of the play area so need to be excluded from the calculation of amount of on‐site
provision required i.e. subtract 936 sq.m from the total:

Page 34

6708 – 936 = 5,772 sq.m meters
STEP 4 – The site would therefore still have to provide 5,772 sq.m of open space (including an equipped play area) and make a
financial contribution of 936 x £30 = £28,080.
Developer’s flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? Some parts of the site are
Does the quality of those spaces meet the quality standard? No
A financial contribution, based on quantity standard, to enhance off-site provision will be required. However, as some of the site is
further than 250m from the open space to be improved, on-site provision is required also, so a mix of on-site provision and financial
contribution will be sought.

Page 35

Example 6 - looking at quality standards
A residential development of 45 flats is proposed, a mix of 30 two‐bed and 15 one–bed flats. Applying the accessibility standard, it
is located close to an existing park and the canal. What would the developer be required to provide?
STEP 1 ‐ The proposal is for more than ten units so the first step is to see if it meets the accessibility standard i.e. is it within 250m
of a 0.2ha amenity greenspace, play space or natural/semi‐natural greenspace? The site is within 250m of a park. The site has less
than 50 units so an equipped play park is not necessarily required on the site. The quality of that park needs to be assessed using
the quality standard.
STEP 2 – the most recent Audit carried out for this site shows that there are a number of concerns about the play equipment,
surfacing and path connections within the park. Using the scoring the play area is assessed as being below the 50% threshold and
requires investment. This means that the play area offers a valid opportunity for developer contribution funding asscociated with the
site.
STEP 3 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 15 585
2 1.9 57 30 1710
Total 45 2295
STEP 4 – To get the total amount of open space required, add together the open space provision 585 + 1710 = 2295. This is the
amount of open space to be provided.
STEP 5– Multiply the open space provision by the financial contribution rate of £30 per sq.m i.e.2,295 sq.m x £30 = £68,850.

Page 36

For this site a financial contribution of £68,850 is required to help upgrade the play equipment within the park.

Page 37

Appendix 4: Information required to be provided in development appraisals
This appendix expands on what applicants are required to include in their development appraisals when asking for consideration of
a reduced or waived fee. 
The Development Appraisal 
The basic calculation to assess whether a contribution should be waived is as follows:-
(X) Estimated Sale Value of Completed Development.
(Y) Total costs of development including any land purchase. The required developer contribution is also a development cost and
should be included here.
(X) minus (Y) gives the expected profit level from the development. Developers will usually expect a profit between 10-20% of
development costs (Y) before proceeding with a development. Therefore, if the submitted appraisal shows that profit levels fall to
an unacceptable level when the developer contribution is included as a cost, the Council will give consideration to reducing the fee.
A greater level of detail than the top line numbers set out in the above basic calculation is however required to be provided within
the development appraisal. The estimated sale value of the development (X) should be broken down into house types to allow the
figures to be easily verified. 
For example:- 
12 no. 4 bed detached houses @ £200k = £2.4m 
4 no. 2 bed semi-detached houses @ £120k each = £0.48m 
Total estimated value of completed development - £2.88million 
Total development costs (Y) should be broken down into the following general headings:
(i) Land purchase costs;
(ii) Professional Fees including legal, project management, architect and estate agents;
(iii) Finance Costs i.e. Bank Interest charges;

Page 38

(iv) Build Costs including all site infrastructure costs; and
(v) Developer Contribution Fee
All of the above information should be provided by the developer on an “open book” basis, with no confidentiality restrictions, to
allow the Council to verify the costs shown by developers if considered necessary. Wherever possible, costs should be confirmed
and certified by consultants employed by the developer.
Once all of the above information has been submitted, the Council may seek internal or external expertise to verify it and then a
decision about whether the contribution should be reduced will be made.

Page 39

Appendix 5: Open Space Audit information note
In 2016 officers from the Planning Service, supported by officers from Greenspace,
undertook an audit of open spaces in the West Dunbartonshire Planning Authority
area, with some sites revisited/reassessed in 2018.
The audit involved visiting a range of sites across the area falling into the following
categories:
• Amenity greenspace
• MUGAs (multi-use game areas)
• Natural spaces
• Parks
• Play areas
An assessment sheet for each category of open space was used to score each site
(attached). The scoring sheet was created by the Glasgow and Clyde Valley Green
Network Partnership.
Sites were scored against the factors and criteria set out in the assessment sheet,
based on the subjective judgement of the visiting officer. A percentage score for
each site can be calculated by dividing the site’s actual score by the total possible
score available and multiplying by 100.
Given the subjective manner of initial scoring and the passage of time, it would be
prudent for sites to be revisited and scoring updated as part of any practical use of
the audit e.g. in relation to use of the Green Network and Green Infrastructure
Supplementary Guidance. An updated audit is likely to be undertaken in association
with the preparation of the next Local Development Plan (LDP3).
Mapping of the sites assessed and a summary of the information collected and
associated information, including scoring is available at:
https://westdunbarton.maps.arcgis.com/apps/webappviewer/index.html?id=fe102759
a63e4dfbb5251b21400f058a

Page 40

PAN 65 code 6.31 (residential) SLUs Date: Surveyor
Site Name:
Site No:
Excellent - 5 Good - 4 Acceptable - 3 Poor - 2 Very poor - 1 Score
1 Site composition
a Site topography, drainage and
configuration. i.e. extent of site
usuable.
Most (80% or more) of the site is
flat and dry, grassed or similar
and usable for recreational
activities
About half of the site (35 -
75%) is flat and dry,
grassed or similar and
usable for recreational
activities
Little (20% or less) of the
site is flat and dry, grassed
or similar and usable for
recreational activities
b Visual diversity of site Site has a strong a mix of
planting, colour, and visual
interest.
Site has some visual
interest and diversity.
Site has little interst and is
largely mown grass.
c Range of functions available to
users
3 or more functions available e.g.
formal play, MUGA, kickabout
potential, wild areas, seating and
relaxation areas
1 or 2 functions available
to user
Site is effectively mown
grass with little functional
value
subtotal
2 Access appropriate to Amenity
Open Space
a Core route running through or
adjacent to the site, linking
destinations outwith the site
DDA compliant and in excellent
condition, path is well lit and has
seats and bins and there are no
physical barriers between the
route and the site itself.
DDA compliant, in
acceptable condition and
path is lit with some seats
or bins.  Barriers may
exist but are negotiable.
Not DDA compliant (too
steep etc) and/or no lights,
seats or bins.
b Internal access - either in addition
to a through route or only serving
the site 
DDA compliant good condition
with path access to significant
areas of space, seats and bins
DDA compliant,
acceptable condition with
path access to some
areas of space
Not DDA compliant (too
steep etc) and in poor
condition
c No internal paths. Access is
directly from pavement or road
adjacent to site
Can only score 1
subtotal
3 Visitor experience
a Perception of safety No areas with poor sight lines,
entrapment points, obvious signs
of anti-social behaviour
Some areas with poor
sight lines etc but these
can readily be addressed
Lots of remote areas of poor
visibility and remote
entrapment points with no
escape options
b Open and welcoming/inviting Space has an obvious sense of
place and is ledgible as a
publically accessible and usable
resource
Space can and is used
but some sections of the
community by the overall
feel could be improved
encouraging more use
Space feels unwelcoming
and deters use
c Usability highly usable moderately usable Effectively unuseable
subtotal
4 Management and maintenance
a Planned enhancement  through
council resources, community
involvement, grant aid or planning
gain (if already enhanced - n/a)
Detailed plans/designs in place
and resources allocated or
actively being sought
Some aspectes of the site
being considered for
enhancement but further
work required
No plans
b Quality of Maintenance Evidence of regular and
appropriate maintenance to a
high standard in all areas
Evidence of appropriate
maintenance to a
reasonable standard in
key areas
Evidence of minimal or poor
quality maintenance in most
areas
c Control of vandalism, litter, dog
fouling
No or very limited
vandalism/fouling/litter which
doesn't affect the user
experience with good provision
of dog and litter bins
Some limited evidence of
vandalism/ fouling/ litter,
but doesn't detract from
the overall usage of the
open space.  Occasional
bins.
Lots of
vandalsim/fouling/litter
seriously deterring the
usage of the site.  No bins.
subtotal
5 Biodiversity contribution to
green network
a Diversity of planting which
supports wildlife by providing food
and shelter
A wide range of plants and trees
of differing species, height and
age structure.  High proportion of
native species.
A moderate range of plant
and tree diversity with
moderate proportion of
native species
A poor range of plant and
tree diversity
b Range and quality of habitat types
present
A mosaic of different habitats
types e.g. broadleaved
woodland, species rich
grassland, open water and
wetland
Some habitat diversity but
limited
Monoculture with very
limited biodiversity value
c Habitats present are linked or
near a wider network
Obviously within reach of other
adjacent habitat patches allowing
species movement
Possibility of species
movement via the routes
above but not as well
connected.
Fragmented space sitting in
isolation and is unlikely to
be part of a habitat network
subtotal
Total score
Notes: continue on back if required
Scoring of 5 (c) should be verified by use of aerial photography or other sources e.g. habitat maps, if required
Amenity Open Space
Quality Assessment Criteria
Note - Score 2a and 2b below if they are both present on site.  If either are absent enter n/a in the appropriate box
Based on your assessment of the site's performance in relation to all of the previous criteria in sections 1, 2 and 3 above, do you feel the
site is:

Page 41

Multi Use Games Areas (MUGAs)
tick for each
1 3 2 1 Score
a Good Satisfactory Poor
b Good Satisfactory Poor
c Good Satisfactory Poor
2 3 2 1
a Good Satisfactory Poor
b Good Satisfactory Poor
3 Good Satisfactory Poor
a Good Satisfactory Poor
b Good Satisfactory Poor
c
Total
6.4
Access and security
Enclosed/fenced with gate/dog grill
Overlooked by nearby housing
Good all-ability footpath links to surrounding streets
Within park?
Within amenity greenspace?
Stand-alone?
Date:
Surveyor:
Site No:
Site Name:
Notes:
Condition
Fence - maintenance and vandalism
Condition of supporting infrastructure
Equipment - maintenance and vandalism
Safety surface - maintenance and vandalism
Supporting infrastructure
Presence of seating, bins, lighting

Page 42

Woodland Open semi natural Date Surveyor
Location Urban Peri urban Rural
Excellent - 5 Good - 4 Acceptable - 2 Poor - 2 Very poor - 1 Score
1 Access
a Access points obvious, in good
repair and Disability Discrimination
Act compliant
Entrance points clearly
defined, signed, inviting,
clean, welcoming, well
maintained and accessible to
all.
Apparent as an entrance and
in average condition e.g.
some signage, entrance
features
Entrance points not
accessible to all, poorly
maintained and/or
inappropriately located
b Paths which give access to the
main features of the site in good
repair and Disability Discrimination
Act compliant
Paths in excellent condition
and are level with good bound
surfaces, edges well defined,
debris and weed free and well
maintained
Path generally in good
condition and the right place,
some maintenance/expansion
required
Paths generally in poor
condition, maintenance
needed, desire lines indicate
route issues
c Path network appropriate to the
scale and layout of the site
Extensive path network
servicing all parts of the site
Reasonable path network
servicing some of the site
No, or very limited path
network
sub total
2 Supporting infrastructure
a Provision of orientation and
directional signage and
interpretation
Signage and interpretation
well designed and delivered,
legible and well maintaned
with no signs of vandalism
Some signage provided, is in
reasonable condition and
maintained to an acceptable
standard
Lacking in signage or
inadequate and poorly
maintained
b Provision of seats, bins, lighting,
viewing areas etc
Good provision of supporting
infrastructure which is well
located, in good condition and
well well maintained
Some provision of supporting
infrastructure but could be
expanded upon and be of
better quality and better
maintained
Lacking in infrastructure or
inadequate and poorly
maintained
c Range of buildings and other
infrastructure e.g. car park, café,
visitor centre (criteria only
applicable to sites of sufficient
scale)
Good provision of
infrastructure which is in good
condition and well maintained
Some provision of supporting
infrastructure but could be
expanded upon and be of
better quality and better
maintained
Lacking in infrastructure or
inadequate and poorly
maintained
sub total
3 Visitor experience
a Perception of safety No areas with poor sight lines,
entrapment points, obvious
signs of anti-social behaviour
Some areas with poor sight
lines etc but these can readily
be addressed
Lots of remote areas of poor
visibility and remote
entrapment points with no
escape options
b Variety of experience e.g. open
glades, wooded areas, ponds
viewpoints etc
Good range of habitat types,
visual interest and a a varied
user experience
Reasonable range of habitat
types, visual interest and user
experiences
Lack of interest and poor
user experience.
c Open and welcoming/inviting Space has an obvious sense
of place and is ledgible as a
publically accessible and
usable resource
Space can and is used but
some sections of the
community by the overall feel
could be improved
encouraging more use
Space feels unwelcoming
and deters use
sub total
4 Management and maintenance
a Comprehensive Management
Plan in place which guides action 
(only applicable to sites of a
sufficient scale)
Recent and comprehensive
Management Plan in place
and being delivered
Historic Management Plan
exists but out of date but still
some adhoc management
No Management Plan
b Quality and appropriatenes of
maintenance
All areas are well maintained
in line with the habitat
requirements and time of year
Some maintenance on ad hoc
basis
No evidence of habitat
management
c Control of litter, dog fouling and
vandalism
No evidence of
fouling/litter/vandalism/fly
tipping/drinking
Some limited evidence of
fouling/litter/vandalism etc but
doesn't detract from the
overall usage of the space
Extensive
fouling/litter/vandalism etc
seriously deterring  use of the
space
sub total
5 Biodiversity and contribution
to habitat network
a Diversity of species and age
structure at field, shrub and
canopy layers
A wide range of plants and
trees of differing species,
height and age structure. 
High proportion of native
species.
A moderate range of plant and
tree diversity with moderate
proportion of native species
A poor range of plant and
tree diversity
b Range and quality of habitat
types present other than
woodland
A mosaic of different habitats
types e.g. broadleaved
woodland, species rich
grassland, open water and
wetland
Some habitat diversity but
limited
Monoculture with very limited
biodiversity value
c Woodland is part of a wider
woodland network
Obviously within reach of
other adjacent habitat
patches allowing species
movement
Possibility of species
movement via the routes
above but not as well
connected.
Fragmented space sitting in
isolation and is unlikely to be
part of a habitat network
sub total
Total
Notes: continue on back if required
Natural Spaces
Site name
Quality Assessment Category &

Page 43

PAN 65 code 6.1 SLUs Date Surveyor
City, District or Local Park
Excellent -5 Good - 4 Acceptable - 3 Poor - 2 Very poor - 1 Score
1 Access relative to function
a Access points obvious, in good
repair and Disability
Discrimination Act compliant
Entrance points clearly
defined, signed, inviting,
clean, welcoming, well
maintained and accessible
to all.
Apparent as an entrance
and in average condition e.g.
some signage, entrance
features
Entrance points not
accessible to all, poorly
maintained and/or
inappropriately located
b Paths which give access to the
main features of the site in good
repair and Disability
Discrimination Act compliant
Paths in excellent condition
and are level with good
bound surfaces, edges well
defined, debris and weed
free and well maintained
Path generally in good
condition and the right
place, some
maintenance/expansion
required
Paths generally in poor
condition, maintenance
needed, desire lines
indicate route issues
c Path network appropriate to the
scale and layout of the site
Extensive path network
servicing all parts of the site
Reasonable path network
servicing some of the site
No, or very limited path
network
sub total
2 Design and layout
a Visual interest and balance
between elements present
Good balance between
aesthetic, amenity and
recreational elements
creating an attractive space
Adequate design and
balance between the
elements
Poor design and layout with
little interest
b Configuration of elements is
logical, legible and creates
useable space
Design and location of
elements takes account of
topography and aspect
supporting use.
Some aspects of the site
function well but are let
down by less well designed
elements
Elements disconnected and
illegible.  Poor design and
layout.
c Landscaping and vegetation
appropriate to space
Planting & vegetation well
laid out, successfully
reflecting and enhancing
slopes, views, vistas etc
Planting & vegetation
reasonably well laid out to
reflect and enhance slopes,
views, vistas etc
Planting & vegetation fail to
reflect and enhance slopes,
views, vistas creating a
bland space
sub total
3 Supporting infrastructure
a Provision of orientation and
directional signage and
interpretation
Signage and interpretation
well designed and delivered,
legible and well maintaned
with no signs of vandalism
Some signage provided, is in
reasonable condition and
maintained to an acceptable
standard
Lacking in signage or
inadequate and poorly
maintained
b Provision of seats, bins, lighting,
viewing areas etc
Good provision of
supporting infrastructure
which is well located, in
good condition and well well
maintained
Some provision of
supporting infrastructure but
could be expanded upon
and be of better quality and
better maintained
Lacking in infrastructure or
inadequate and poorly
maintained
c Range of buildings and other
infrastructure e.g. car park, café,
visitor centre (criteria only
applicable to sites of
sufficient scale)
Good provision of
infrastructure which is in
good condition and well
maintained
Some provision of
supporting infrastructure but
could be expanded upon
and be of better quality and
better maintained
Lacking in infrastructure or
inadequate and poorly
maintained
sub total
4 Visitor experience
a Range of user functions 3 or more functions e.g.
formal play, MUGA,
kickabout area, wild areas,
seating and relaxation areas,
bandstand, etc
1 or 2 functions available to
user
Site is effectively mown
grass with little functional
value
b Perception of safety No areas with poor sight
lines, entrapment points,
obvious signs of anti-social
behaviour
Some areas with poor sight
lines etc but these can
readily be addressed
Lots of remote areas of poor
visibility and remote
entrapment points with no
escape options
c Open and welcoming/inviting Space has an obvious sense
of place and is ledgible as a
publically accessible and
usable resource
Space can and is used but
some sections of the
community by the overall
feel could be improved
encouraging more use
Space feels unwelcoming
and deters use
sub total
5 Management and
maintenance
a Comprehensive Management
Plan in place which guides
action  (only applicable to
sites of a sufficient scale)
Recent and comprehensive
Management Plan in place
and being delivered
Historic Management Plan
exists but out of date but still
some adhoc management
No Management Plan
b Quality of Maintenance Evidence of regular and
appropriate maintenance to
a high standard in all areas
Evidence of appropriate
maintenance to a reasonable
standard in key areas
Evidence of minimal or poor
quality maintenance in most
areas
c Control of vandalism, litter, dog
fouling
No or very limited
vandalism/fouling/litter
which doesn't affect the user
experience with good
provision of dog and litter
bins
Some limited evidence of
vandalism/fouling/litter, but
doesn't detract from the
overall usage of the open
space.  Occasional bins.
Lots of
vandalsim/fouling/litter
seriously deterring the
usage of the site.  No bins.
sub total
6 Biodiversity contribution to
habitat network
a Diversity of planting which
supports wildlife by providing
food and shelter
A wide range of plants and
trees of differing species,
height and age structure. 
High proportion of native
species.
A moderate range of plant
and tree diversity with
moderate proportion of
native species
A poor range of plant and
tree diversity
b Range and quality of habitat
types present
A mosaic of different
habitats types e.g.
broadleaved woodland,
species rich grassland, open
water and wetland
Some habitat diversity but
limited
Monoculture with very
limited biodiversity value
c Habitats present are likely to be
part of a wider network
Obviously within reach of
other adjacent habitat
patches allowing species
movement
Possibility of species
movement via the routes
above but not as well
connected.
Fragmented space sitting in
isolation and is unlikely to
be part of a habitat network
sub total
Total
Notes: Continue on back if required
Parks and Gardens
Site Name :
Quality Assessment Criteria

Page 44

6.4
tick for each
1 Age Range
a Up to 7yrs
b 7 to 14 yrs
c 14 yrs plus
2 Range of equipment 3 2 1 Score
a number of play pieces 10+ 10<5 5<0
b diversity of play experience offered Good Satisfactory Poor
c opportunities for natural play Good Satisfactory Poor
3 Condition of equipment and safety surface 3 2 1
a Maintenance and vandalism Good Satisfactory Poor
b Old and outdated equipment New Satisfactory Old
c Evidence of removed pieces Many Some None
3 Supporting infrastructure 3 2 1
a Presence of seating, bins, lighting Good Some No
b Condition of supporting infrastructure Good Satisfactory Poor
4 Access and security 3 2 1
a Enclosed/fenced with gate/dog grill Yes Partly No
c Overlooked by nearby housing Yes Partly No
d Good all-ability footpath links to surrounding streets Yes Yes No
Total
Notes:
Within amenity greenspace?
Stand-alone?
Children's Play
Site No:
Site Name:
Surveyor
Date:
Within park?