Agenda
Planning Committee
Date:  Wednesday, 16 November 2022
__________________________________________________________________
Time:  10.00 
__________________________________________________________________
Venue:  Civic Space 
Council Offices, 16 Church Street, Dumbarton
__________________________________________________________________
_
Contact:   Email: Nicola.moorcroft@west-dunbarton.gov.uk
Committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Planning Committee as detailed above.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Karen Conaghan
Councillor Ian Dickson
Councillor Diane Docherty
Councillor Daniel Lennie
Provost Douglas McAllister
Councillor June McKay
Councillor Chris Pollock
Councillor Hazel Sorrell
All other Councillors for information
Date of Issue: 3 November 2022
Page 2

Page 3

PLANNING COMMITTEE
WEDNESDAY, 16 NOVEMBER 2022
AGENDA
1
2
APOLOGIES
DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the
items of business on this agenda and the reasons for such
declarations.
3 MINUTES OF PREVIOUS MEETINGS  5 - 15 
Submit for approval as a correct record, the Minutes of Meeting of
the Planning Committee held on 12 October 2022
4 NOTE OF VISITATION  17 - 18
Submit, for information, Note of Visitations carried out on 10 October 2022.
5 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
6 PLANNING APPLICATION 19 - 38
Submit a report by the Planning, Building Standards and
Environmental Health Manager  in respect of the following planning
application:- 
DC20/253 - Amendment to Condition 1 of planning permission
DC07/233/FUL to extend the time of the approved landfilling operation
and restoration by 15 years at Auchencarroch Landfill Site,
Auchencarroch Road, Jamestown, Alexandria by Barr Environmental Ltd.
7/
Page 3

Page 4

7 39 - 213LOCAL DEVELOPMENT PLAN 2 –
SUPPLEMENTARY GUIDANCE
Submit report by the Planning, Building Standards and Environmental Health
Manager advising of the outcome of consultation on draft Supplementary
Guidance and seeking approval of the finalised version of the Guidance.
8 PLANNING APPEAL DECISION – COFFE SHOP WITH 215 -  217
DRIVE-THROUGH, MORRISONS CAR PARK, 36 GLASGOW
ROAD, DUMBARTON
Submit report by the Planning, Building Standards and Environmental Health
Manager, advising that an appeal relating to a Committee decision to refuse
planning permission for a drive-through coffee shop on part of the Morrisons
supermarket car park on Glasgow Road, Dumbarton, has been dismissed.
Page 4

Page 5

PLANNING COMMITTEE
At a Meeting of the Planning Committee held in Council Chamber, Clydebank Town
Hall, 5 Hall Street, Clydebank on Wednesday, 12 October 2022 at 10.00 a.m.
Present: Provost Douglas McAllister and Councillors Karen Conaghan,
Ian Dickson, Diane Docherty, Gurpreet Singh Johal, June
McKay, Lawrence O’Neill, Chris Pollock and Hazel Sorrell. 
Apologies: An apology for absence was intimated on behalf of Councillor
Daniel Lennie.
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; Alan Williamson, Team Leader,
Development Planning and Place; James McColl, Acting
Development Management Team Leader; Nigel Ettles, Section
Head – Litigation (Legal Officer); and Nicola Moorcroft,
Committee Officer.
Councillor Lawrence O’Neill in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
MINUTES OF PREVIOUS MEETINGS
The Minutes of Meetings of the Planning Committee held on 3 August 2022 and 21
September 2022 were submitted and approved as a correct record.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
PLANNING APPLICATIONS
The following reports were submitted by the Planning, Building Standards and
Environmental Health Manager – in respect of the following planning applications:-
Page 5
ITEM 3

Page 6

(a) DC22/049/MSC – Approval of matters specified in conditions 1, 3, 5 and 7
of PPiP approval DC19/203 for the erection of 99  dwelling houses,
formation of access, landscaping, open space,  SUDS and associated
infrastructure at Farm Road, Duntocher, Clydebank by BDW Trading Ltd. 
Reference was made to a site visit that had been undertaken in respect of the above
application.  The Planning, Building Standards and Environmental Health Manager
was heard in further explanation of the report and in answer to Members’ questions. 
The Chair invited Mr Gordon Lindsay, objector, to address the Committee. Mr
Lindsay was heard in support of his objections and in answer to Members’ questions. 
The Chair invited Mr Harry Borthwick, objector, to address the Committee. Mr
Borthwick was heard in support of his objections and in answer to Members’
questions. 
The Chair invited Mr Lewis Breen, objector, to address the Committee. Mr Breen
was heard in support of his objections and in answer to Members’ questions. 
The Chair invited Ms Jeanne Robinson, objector, to address the Committee. Ms
Robinson was heard in support of her objections and in answer to Members’
questions. 
The Chair invited Mr David Jinks on behalf of the applicant (Barratt Homes), to
address the Committee.  Mr Jinks was heard in respect of the application and in
answer to Members’ questions. 
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation and in answer to Members’
questions, Provost Douglas McAllister, seconded by Councillor Lawrence O’Neill,
moved: 
I note and recognise that in September 2020, Planning Permission in Principle
was granted on appeal.  I accept that this Council has exhausted all legal
routes to appeal Planning Permission in Principle for residential development
on this site.  Accordingly, Planning Permission in Principle remains granted. 
We can’t revisit that now, and I understand the frustration of local residents
that we can’t now revisit their representations such as traffic concerns, Green
Belt concerns, pollution concerns and ecological concerns. 
I cannot understand why anyone thinks a singular access road from Farm
Road is workable or realistic in practice.  The local road network at Farm
Road is already severely congested.  That is not my reason for moving refusal
nor is my reason for moving refusal the loss of wildlife within the site and the
loss of nature as highlighted by the slides during a representation this morning
by a local resident, which I agree is heart breaking.  My reasons for refusal
are none of the above. 
Page 6

Page 7

My objection to the planning application is in relation to the layout and design
of the application.  Policy GD1 maintains that any new development must
respect character and amenity of the area.  Scottish Planning Policy (SPP)
requires or introduces a presumption in favour of sustainable development.  A
development must be socially sustainable.  The aim of the National Scottish
Planning Policy is to achieve the right development in the right place; and not
allow a development at any cost and that a development must create better
places.  This application does not.   
I also move refusal on the basis of Policy CP1 which seeks to ensure that
housing is of a high-quality, adaptable, and is designed to be suitable for a
mix of occupants.  It also indicates that all new developments will be expected
to contribute towards creating successful places by having regard to the six
qualities of a successful place, one of which is the quality easy to get to/move
around and this application certainly doesn’t achieve that.   
The application does not minimise the visual impact, in fact it will have an
adverse effect, the visual impact of the development within the landscape will
detract from the local amenity and will detract from the overall character of the
local settlement and the adjoining Kilpatrick Hills.   
I don’t consider that the proposed development is appropriate in terms of
layout and design and therefore move refusal.’ 
The motion to refuse planning permission was agreed by the Committee 
(b) DC22/072/FUL – Residential development, landscaping and associated
infrastructure at the former Our Lady and St Patrick’s High School site,
Hawthornhill Road, Dumbarton by Persimmon Homes. 
Reference was made to a site visit that had been undertaken in respect of the above
application.  The Planning, Building Standards and Environmental Health Manager
was heard in further explanation of the report and in answer to Members’ questions. 
The Chair invited Mrs Violet Struthers, objector, to address the Committee. Mrs
Struthers was heard in support of her objections and in answer to Members’
questions. 
The Chair invited Mr Thomas Struthers, objector, to address the Committee. Mr
Struthers was heard in support of his objections and in answer to Members’
questions. 
The Chair invited Mr Kevin Murphy on behalf of the applicant (Persimmon Homes),
to address the Committee.  Mr Murphy was heard in respect of the application and in
answer to Members’ questions. 
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation, and in answer to Members’
questions, the Committee agreed that it was minded to grant planning permission
Page 7

Page 8

and delegated authority to the Planning, Building Standards and Environmental
Health Manager to issue the decision subject to the conditions set out in Section 9 of
the report, as detailed within Appendix 1 hereto and to the satisfactory conclusion of
a legal agreement or other suitable mechanism to secure a financial payment
towards open space provision/ green infrastructure improvements in the local area. 
PROCUREMENT OF GEOGRAPHIC INFORMATION SYSTEM SOFTWARE 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager seeking approval to enter a process for the procurement of
Geographic Information System software. 
After discussion having heard the Team Leader, Development Planning and Place,
in further explanation, and in answer to Members’ questions, the Committee agreed
to approve the undertaking of a procurement exercise for the supply of Geographic
Information System software. 
CLYDE CLIMATE FOREST 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager seeking approval of a concordat in relation to the Clyde Climate
Forest. 
After discussion having heard the Team Leader, Development Planning and Place,
in further explanation, and in answer to Members’ questions, the Committee agreed
to approve the Clyde Climate Forest concordat. 
The meeting closed at 11.58 a.m. 
Page 8

Page 9

Appendix 1 
DC22/072/FUL – Residential development, landscaping and associated
infrastructure at the former Our Lady and St Patrick’s High School site,
Hawthornhill Road, Dumbarton by Persimmon Homes. 
GRANT planning permission subject to the following conditions:- 
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be used for
the houses within the development site shall be submitted to and approved in
writing by the Planning Authority. Thereafter, unless otherwise agreed in
writing with the Planning Authority, the development shall be completed in
strict accordance with the approved material details and palette. 
2 Further to condition 1 above, unless otherwise agreed in writing with the
Planning Authority, the brick type to be used for the elevation treatment of all
houses within the development site shall be of the ‘Forterra Victorian Mixture’
specification and variety. 
3. Further to Conditions 1 and 2 above, prior to the approved brickwork
associated with any house being constructed or installed on site, a sample
panel of this brickwork shall be constructed on site in order for it and the
associated mortar to be reviewed, inspected and approved in writing by the
Planning Authority. Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved brick details. 
4. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed prior to the
commencement of works on site with the Planning Authority. 
5. Notwithstanding the approved plans , an updated planting schedule to
incorporate Hawthorn planting and clarify the suitability of the planting within
the SuDS area shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of any works on site and shall be
implemented with a timescale to be agreed with the Planning Authority. 
6. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
7. That full details of maintenance and management for the landscaping
approved shall be submitted to and approved in writing by the Planning
Authority prior to the start of construction of the development hereby
permitted. Management and maintenance shall commence upon completion
of the landscaping.
Page 9

Page 10

8. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course.
9. That within 4 weeks of the last of the houses hereby permitted being
completed, all roads and footways within the application site shall be
completed to a final wearing course. 
10. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house.
The offstreet parking provision inclusive of garages where they part of this
parking provision shall be shall then remain unobstructed and available for
use by residents of the associated house at all times thereafter. 
11. No construction works except ground investigation works shall commence on
site until the existing pedestrian crossing on Cardross Road shall be relocated
and be fully operational in the new position. 
12. No construction works shall commence on site until full details of the new
position of the existing bus stop on Cardross Road currently in the position of
the relocated pedestrian crossing shall be submitted to and approved in
writing by the Planning Authority in consultation with SPT with the relocation
taking place and the bus stop being available for use by services 
13. That the approved drainage regime inclusive of the SuDS pond shall be fully
implemented. For the avoidance of doubt, the drainage regime shall be
implemented commensurately with the construction of the houses it serves. 
14. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing ty the Planning Authority prior to the
commencement of any works on site. The measures shall be implemented
and maintained as approved. 
15. No site clearance works shall be undertaken during the bird nesting
September inclusive unless first agreed in writing by the Planning Authority.
For the avoidance of doubt, any such agreement will require a full nesting bird
survey prior to the commencement of works on site, the methodology and
findings of which shall be submitted to the Planning Authority. 
16. That prior to the commencement of any works on site, full details of the
incorporation of low or zero carbon generating technologies shall be
submitted to and approved in writing by the Planning Authority. Thereafter the
development shall be undertaken in accordance with the approved details. 
17. Prior to the commencement of development with the site, details of the
location and design of electric charging points/units and associated
infrastructure and ducting to serve the development shall be submitted to and
approved in writing by the Planning Authority. The approved car charging
points/units/ducting and associated infrastructure shall thereafter be installed
Page 10

Page 11

in accordance with the approved details at a timescale agreed by the Planning
Authority and maintained at all times thereafter. 
18. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
19. Details of the provision of grit bins for the development shall be submitted to
and approved in writing by the Planning Authority. The agreed details shall be
in place prior the occupation of the first house within the site and thereafter
maintained for the lifetime of the development. 
20. Prior to the commencement of works on site, details of any street furniture
shall be submitted to and approved in writing by the Planning Authority and
shall be implemented within an agreed timescale. 
21. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority. Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall
be provided to new residents. 
22. No development (other than investigative work) can take place until such time
as a comprehensive site investigation has been carried out to the appropriate
Phase level and submitted to and approved in writing by the Planning
Authority. The investigation shall be completed by a suitably qualified and
competent person and completed in accordance with advice given in the
following: 
•  Planning Advice Note 33 (2000) and Part IIA of the Environmental
Protection 
•  Act 1990 (as inserted by section 57 of the Environment Act 1995) 
•  BS 10175:2011+A1:2013 – British Standards institution ‘The
Investigation of Potentially Contaminated Sites – Code of Practice’. 
•  Land Contamination and Development Management -
Guidance.https://www.epscotland.org.uk/wp[1]content/uploads/2019/09
/ConLanDevGuide_12-Aug19-FINAL.pdf 
23. If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated and these linkages must be
subjected to risk assessment. If a Phase 2 investigation is required, then a
risk assessment of all relevant pollution linkages will require to be submitted. 
24. If the risk assessment identifies any unacceptable risks then an appraisal of
remedial options followed by a detailed remediation scheme will be submitted
to and approved in writing by the Planning Authority. No works other than
Page 11

Page 12

investigative works shall be carried out on site prior to receipt of the Planning
Authority’s written approval of the remediation scheme. 
25. No development (other than investigative works) shall commence on site until
such time as a detailed remediation scheme for the site has been submitted to
and approved in writing by the Planning Authority. The scheme shall be
prepared by a suitably qualified person and shall detail the measures
necessary to bring the site to a condition suitable for the intended use by
removing unacceptable risks to health, buildings and other property, and the
natural and historical environment. The scheme shall include details of all
works to be undertaken, the remediation objectives and criteria, a timetable of
works and/or details of the phasing of works relative to the rest of the
development, and site management procedures. The scheme shall ensure
that upon completion of the remediation works the site will not qualify as
contaminated land under Environmental Protection Act 1990 Part IIA in
relation to the intended use of the land after remediation. 
26. The approved remediation scheme shall be carried out in accordance with its
terms prior to the commencement of development other than that required to
carry out remediation, unless otherwise agreed in writing by the Planning
Authority. The Planning Authority shall be notified in writing of the intended
commencement of remediation works not less than 14 days before these
works commence on site. 
27. Upon completion of the remediation works and prior to the site being
occupied, a verification report which demonstrates the effectiveness of the
completed remediation works shall be submitted to and approved in writing by
the Local Planning Authority. 
28. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease. At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works. The approved details shall be implemented
as approved. 
29. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours. 
30. On completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use.
Page 12

Page 13

Page 13

Page 14

31. No development shall commence on site until such time as a noise control
method statement for the construction period has been submitted to and
approved in writing by the Planning Authority. This statement shall identify
likely sources of noise (including specific noisy operations and items of
plant/machinery), the anticipated duration of any particularly noisy phases of
the construction works, and details of the proposed means of limiting the
impact of these noise-sensitive properties. The construction works shall
thereafter be carried out in accordance with the approved method statement
unless otherwise approved in writing by the Planning Authority. 
32. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
•  Mondays to Fridays: 0800 – 1800 
•  Saturdays: 0800 – 1300 
•  Sundays and public holidays: No Working 
33. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority. The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust. The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority. 
34. No commercial vehicle making deliveries to or collecting material from the
development shall enter or leave the site before 0800 or after 1800. 
35. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority. This statement
shall include an assessment of the impact of the piling on surrounding
properties, taking into account the guidance contained in BS 6472: 1984
‘Evaluation of Human Response to Vibration in Buildings’. It shall detail any
procedures which are proposed to minimise the impact of noise and vibration
on the occupants of surrounding properties. This statement shall be prepared
by a suitably qualified person, and the piling works shall thereafter be carried
out in accordance with the approved method statement. 
36. Notwithstanding condition 36 above, full details of the design, height and
location of an acoustic fence adjacent the sports pitch shall be submitted to
and approved in writing by the Planning Authority. The fence shall then be
erected prior to the occupation of any dwellinghouse on plots 32 to 44
inclusive. 
Page 14

Page 15

37. No development shall commence on site until details for the storage and the
collection of waste arising from the development and the location of grit bins
shall be submitted to and approved in writing by the Planning Authority. The
agreed details shall be in place prior the occupation of the first housing
unit/property within the site and thereafter maintained for the lifetime of the
development. 
Page 15

Page 16

Page 16

Page 17

PLANNING COMMITTEE
NOTE OF VISITATIONS – 10 OCTOBER 2022
Present: Councillors Diane Docherty, Gurpreet Singh Johal, June McKay
and Chris Pollock
Attending: Pamela Clifford - Planning, Building Standards and
Environmental Health Manager 
SITE VISITS
Site visits were undertaken in connection with the undernoted planning applications:-
Farm Road, Duntocher, Clydebank by BDW Trading Ltd.
DC22/049/MSC - Approval of matters specified in conditions 1, 3, 5 and 7 of PPiP
approval DC19/203 for the erection of 99 dwelling houses, formation of access,
landscaping, open space, SUDS and associated infrastructure.  
Former Our Lady and St Patrick’s High School site, Hawthornhill Road,
Dumbarton by Persimmon Homes
DC22/072/FUL – Residential development, landscaping and  associated infrastructure
Page 17
ITEM 4

Page 18

Page 18

Page 19

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 16th November 2022
_____________________________________________________________
DC20/253: Amendment to Condition 1 of planning permission
DC07/233/FUL to extend the time of the approved landfilling
operation and restoration by 15 years at Auchencarroch
Landfill Site, Auchencarroch Road, Jamestown, Alexandria by
Barr Environmental Ltd
1. REASON FOR REPORT
1.1 The application seeks to amend the terms of a condition of a planning application
originally determined by the Planning Committee. The application also relates to a
landfill operation which has an annual waste capacity of over 25,000 tonnes and
therefore the original application would, if submitted afresh, would comprise a
major development as defined by The Town and Country Planning (Hierarchy of
Developments) (Scotland) Regulations 2009. Under the terms of the approved
Scheme of Delegation, it therefore requires to be determined by the Planning
Committee.
2. RECOMMENDATION
2.1 That the Committee indicate that it is Minded to Grant planning permission for the
operation of the site until 30th June 2024 and completion of the final restoration  by
30th June 2026 and delegate authority to the Planning, Building Standards and
Environmental Health Manager to issue the decision subject to the conditions set
out in Section 9 and the satisfactory review of the extant legal agreement and
conclusion of a new or updated legal agreement or other suitable mechanism to
secure an increased restoration bond value.
3. DEVELOPMENT DETAILS
3.1 Auchencarroch Landfill Site is located to the south-east of Jamestown and lies
between the open hills of Auchencarroch and Pappert Hill. It sits in a natural
plateau and although the site itself is hidden by the rising landform in front, the
access road is visible from Auchencarroch Road. The site has few neighbouring
sensitive receptors, the closest residential property being Mid Auchencarroch
Farmhouse, the owner of which is an interested party cited on the existing legal
agreement. Other agricultural holdings, primarily used for livestock grazing,
surround the site in all directions.
3.2 The existing landfill site has been operational since 1995 and planning permission
was granted in 2004 (DC02/324) to increase the life span of the area by extending
the area of the landfill facility. Application DC07/233/FUL allowed for the further
ITEM 6
Page 19

Page 20

extension of the site to the south-east. This area is a natural valley between
Auchencarroch and Pappert Hills and comprises a mix of semi-improved upland
pasture, heathland, and blanket bog. The proposal allowed for land raising to
continue the overall height of the existing restored landform in an easterly direction.
The finished landform of the existing and proposed landfill granted form a low hill
covered with heathland vegetation. This is a lower height than Auchencarroch Hill
(210m) and Pappert Hill (257m) and maintains surface drainage profile by having
gentle slopes on the east and west approaches. In terms of site area, the area
extended the landfill workings to 27.4ha within a total area of 43.2ha. Adjacent to
the site, also operated by Barr, is a materials recycling facility (MRF) which was
granted permission in 2013. The MRF separates out recyclable material from
waste, before the waste material goes to landfill.
3.3 Since the granting of planning permission in 2008, the volume of material and rate
of landfill has reduced, and it is anticipated this will continue to reduce with further
reductions in the waste that can be sent to landfill. Accordingly, existing capacity
remains on the site with the applicant indicating that eight cells for landfilling remain
unutilised. A programme for landfilling to utilise these cells is set out by the
applicant with the final cell due for completion by November 2037. 
3.4 Planning permission is sought to amend condition 1 of planning application
DC07/233/FUL which was granted permission on the 3rd of September 2008 for
the extension to landfill site including on-site recycling facility. 
Condition 1 states that:
“The development hereby permitted shall enure for the benefit of the applicant only
with the approved landfill operations to be completed by 31 December 2022 and
the final restoration of the site by 2024 unless otherwise agreed by the Planning
Authority”.   
3.5 Permission is sought to extend the time of the approved landfilling operation and
restoration by a further fifteen years. There is no physical extension to the landfill
proposed. The reason for the proposed time extension is due to the rate of
landfilling (amount of material coming on site) over the years since 2009, being
significantly less than originally anticipated due to a number of factors. This
includes reduction of waste being sent to landfill because more is now recycled,
increasing landfill tax and the opening of the Auchencarroch Materials Recycling
Facility which has increased on-site recycling rates. In addition to this there is an
upcoming landfill ban for household waste coming into force in 2025. For the
avoidance of doubt, the total landfill volume will not change, just the time period
over which the operation will take place. 
3.6 It is proposed to operate the landfill under the same restrictions placed on them
via previous planning consents. The landfill would be for the disposal of non-
hazardous waste and the site would operate between 7.30am and 5.00pm Monday
to Saturday with any additional working hours by written agreement with the
Planning Authority. The number of deliveries of landfill material to the site would
be restricted to a maximum of 116 in any one working day (232 HGV movements
per day) in accordance with the existing permission. 
Page 20

Page 21

3.7 The landfill operations during the proposed extended operational period would be
a continuation of those currently undertaken at Auchencarroch. The types of
wastes landfilled include residual household waste for West Dunbartonshire,
Inverclyde and Argyll and Bute local authorities. The site also accepts wastes from
local carriers. Residual wastes are those wastes left after the kerbside collection
and recovery of materials that can be recycled. 
3.8 The restoration after landfill would continue to be progressive during the life of the
site, initially to grassland to stabilise the soil restored on the capped surface of the
landfill but ultimately to dry heath vegetation and grassland for pasture. New
planting proposals around the perimeter of the site have been identified with the
majority taking place after restoration. On conclusion of the restoration, the surface
water treatment lagoon and reedbeds would be restored to wetland habitats.
3.9 The original application was a development that required the submission of an
Environmental Impact Assessment (EIA). For the purposes of the Section 42
application and updated EIA forms part of the application submission together with
a range of supporting documentation including a Planning Statement, Transport
Assessment, Preliminary Ecological Appraisal, Habitat Management Plan, Flood
Risk Assessment and Management Plans for Dust and Odour.
3.10 Following the submission of the application it was requested by the applicant that
processing of the application was sisted for business and operational reasons. This
resulted in the application being on hold for over a year.  The applicant has now
requested that the application is progressed to a determination as originally
submitted. 
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service and Environmental Health, SEPA,
NatureScot, Loch Lomond and the Trossachs National Park and West of Scotland
Archaeological Society  have no objection to the proposal.
4.2 West Dunbartonshire Council Biodiversity Officer has no objections in principle
however a number of points require to be considered in determining the
appropriateness of a time extension to the operation of the site including the validity
of the Ecological Appraisal, the ongoing Habitat Management proposals and the
requirement for a Landscape and Biodiversity Management Plan.
4.3 Scottish Water have not responded at the time of writing this report.
5. REPRESENTATIONS
5.1 Objections from three individuals were received in connection with the application.
The detail of each submitted representation is available in the electronic planning
file for the application and available for public viewing. The concerns raised can,
however, be summarised as follows:
Purpose of Site
• There is no requirement for the site given recycling requirements.
Page 21

Page 22

Light Pollution
• There are issues from excessive illumination.
• None of the photos submitted are taken at night and this does not show the
large amount of lighting that is on all night.
• The lighting in a rural location is very intrusive.
• Lighting should be directed downwards so it only illuminates below and not all
round.
Odour
• There have been odour problems for the past 25 years so severe at times you
become nauseous.
• The odour problems are directly affecting a local business over recent years.
Noise
• Loud noises are coming from the newly extended site.
Vehicle movement
• There has not been adequate assessment of traffic levels along
Auchencarroch Road.
• Buses, waste vehicles, commercial vehicles and vehicles from the  sawmill use
this road.
• Vehicle speed is not regulated.
• Measures should be put in place to control speed.
Environmental Impact
• An assessment of the carbon footprint and environmental impact of the
haulage commercial vehicles and plant that are used in the delivery of this site
should be undertaken.
• There should be an environmental assessment of the vehicle and plant
operations including vehicle travel time, plant operations on site and the
associated commercial vehicles needed to operate the site.
5.2 The points and concerns raised will be considered in Section 7 below.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
Clydeplan Strategic Development Plan 2017
6.1 The 2017 Clydeplan Strategic Development Plan (Clydeplan) sets out a strategic
vision to be implemented through a spatial development strategy and advises on
planning for zero waste inclusive of the role landfill plays in dealing with waste.
Policy 11 advises on development proposals for waste management facilities.
Clydeplan recognises that even with high recycling targets, there will be wastes
from which no further value can be recovered and which will require to be put to
landfill. Accordingly, a requirement for a ten-year rolling capacity for landfill has
been set by the Scottish Government. However, it is recognised that this will
reduce over time in order to achieve the long-term zero waste plan (ZWP) target
of a maximum of 5% to landfill by 2025. The ten year rolling landfill capacity
requirement for the Clydeplan area is 10.1 million tonnes. Currently there is
adequate capacity within existing and approved sites within the city region to
Page 22

Page 23

satisfy this requirement. The ten-year rolling landfill capacity requirements is to be
updated annually by SEPA and this will be kept under review by Clydeplan
6.2 The proposal does not seek to extend the capacity of the site, but rather extend
the operation time period to utilise existing capacity due to a lower rate of landfilling
than anticipated. This presents no conflict with Clydeplan and accordingly is
subject to an assessment against the Local Development Plan.
West Dunbartonshire Adopted Local Plan 2010
6.3 Policy PS1 seeks to protect established public utility, social and community
facilities as identified on the Proposals Map. The existing landfill site at
Auchencarroch is identified on the Proposals Map under this policy and forms a
public utility, the operation of which the Council seeks to protect. Policy PS4
advises on proposals for new or extended waste management infrastructure and
facilities including landfill sites and sets out the criteria for the assessment of such
proposals. This includes according with relevant waste strategies and plans, being
within or adjacent to an existing facility and complying with other Local Plan
policies. The proposal relates to an existing landfill site and does not seek to extend
the land take of the site, nor its capacity. It does seek to extend the time period for
the operation of the site to utilise existing consented, but unused capacity. 
6.4 Policy E1 seeks to ensure  the conservation of biodiversity and Policy E3A seeks
to ensure that development proposals do not have an adverse effect on the
integrity or character of Local Nature Conservation Sites. Policy E9 requires that
development proposals will have regard to the landscape character and
distinctiveness of the Plan area and of adjoining areas. Proposals which are
detrimental to the landscape will not generally be supported. Policy BE5 seeks to
ensure that cultural heritage resources such as archaeological sites are not
adversely affected. Policies F1 and F2 aim to ensure that new development is not
at risk from, and does not increase the risk of flooding, and has suitable SuDS
drainage infrastructure.
6.5 Policy GD1 seeks to ensure that all new development respects the character and
amenity of the area and sets out a range of criteria for the assessment of all
development proposals. 
6.6 The overall principle of the proposal to extend the time period for the operation of
the site is considered to comply with the policies of the adopted Local Plan.
However, it is assessed fully in Section 7 below, it is considered that a short term
extension to the time period is appropriate. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
7.1 The application is made under section 42 of the Planning Act 1997 which is an
application for planning permission for the development of the land but without
compliance with a condition or conditions on the original permission. In this case,
the applicant seeks not to comply with the terms of condition 1 of planning
permission DC07/233/FUL which requires landfill operations to cease by 31st
December 2022 and restoration operations to be completed by 2024. The effect of
a Section 42 application, if successful, is to grant planning permission again for the
whole development but with the amended conditions replacing those that were
Page 23

Page 24

issued previously. The original application, as approved, has commenced and
therefore if granted it must be ensured that any conditions attached to the new
permission are relevant to the continued operation of the site.  Planning
Authorities, if minded, may attach new or updated conditions if permission is
granted.
National Policy
7.2 National Planning Framework (NPF) 3 requires all Scotland’s resources, including
waste, to be managed sustainably. NPF3 states that a decentralised network of
processing facilities will be needed for a circular economy where waste is
recognised as a resource opportunity and Planning Authorities are therefore
expected to work with the market to identify viable waste solutions with
sustainability central to all waste management.
7.3 Scottish Planning Policy (SPP) introduces a presumption in favour of sustainable
development. SPP also sets out that Scotland has a zero waste policy which
includes minimising landfill use to 5% of all waste output by 2025. SPP also
promotes the delivery of waste infrastructure at appropriate locations and waste
management should be prioritised through the Scottish Government’s waste
hierarchy. The hierarchy identified in Paragraph 176 is waste prevention, reuse,
recycling, energy recovery and waste disposal. Paragraph 182 goes on to advise
that that the planning system should support the provision of a network of
infrastructure to allow Scotland’s waste and secondary resources to be managed
in one of the nearest appropriate installations, by means of the most appropriate
methods and technologies, in order to protect the environment and public health. 
7.4 The proposal does not seek to extend the capacity of the site  but rather to extend
the operation time period to utilise existing capacity due to a lower rate of landfilling
than anticipated. The site currently has existing infrastructure in place that is
suitable for its continued use, is sited in an appropriate location and will continue
to provide a waste disposal facility which does not conflict with the aims of National
Policy. 
Zero Waste Plan Scotland (2010)
7.5 Scotland’s Zero Waste Plan sets out a vision that seeks to ensure that resource
use is minimised, valuable resources are not disposed of in landfills, and most
waste is sorted into separate streams for reprocessing, leaving only limited
amounts of waste to go to residual waste treatment. Adjacent to the landfill site is
a material recycling facility granted planning permission in 2013 and this separates
recyclables from waste before it goes to landfill. Accordingly, it is considered that
the operation on site does not conflict with Zero Waste Scotland policy as it
currently provides the opportunity to sort waste, to reuse it and recycle and to
reduce the amount that is deposited in landfill.
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.6 The modified Plan and associated documents was approved by the Council on 19
August 2020. The Council has advised the Scottish Ministers of its intention to
adopt the Plan. On 18 December 2020, the Scottish Ministers issued a Direction
in relation to the housing land chapter of the Plan. None of the policies considered
in the determination of this application are affected by that Direction. Therefore,
Local Development Plan 2 is the Council’s most up to date policy position and is
Page 24

Page 25

afforded significant weight in the assessment and determination of planning
applications. 
7.7 The site is identified as an existing waste management facility and by Policy ZW1
and associated Table 10. Policy ZW1 requires that all such development meets
with the aims of the Zero Waste Plan and follow the development principles of the
Waste Hierarchy. The criteria for the assessment of new waste management
facilities is set out in the Policy, however it remains that this is not a new facility,
but rather a time extension to the operation of the existing facility to utilise
consented but unused capacity. Policy MIN2 requires appropriate financial
guarantees in respect of restoration. Whilst the policy relates to minerals extraction
rather than landfill sites, the general principles of the Policy are considered
relevant. 
7.8 Policy ENV1 addresses nature conservation and requires developments to
conserve biodiversity and habitat networks both within and adjacent to sites of
special designation together with non-designated habitats and protected species.
Policy ENV2 requires development to be sited and designed so as to relate to the
existing landscape character and ensure the integrity of landscape character is
maintained. Policy BE1, ENV4 ENV5 and ENV6 are similar to the cultural heritage,
water environment and flooding policies of the adopted Local Plan. Policy CP1
requires all new development to contribute towards creating successful places.
7.9 The overall principle of the proposal to extend the time period for the operation of
the site is considered to comply with the policies of proposed Local Development
Plan 2. 
Principle of Development
7.10 The site is currently an existing landfill site operating in accordance with planning
permission DC07/233/FUL. In terms of the current operation, the site allows the
controlled disposal by landfill of a variety of waste including from both household
and commercial sources. The site is identified within the adopted Local Plan and
proposed Local Development Plan 2 as a waste management site. In assessing
this application which has been submitted under Section 42 of the Town and
Country Planning (Scotland) Act 1997 (as amended), it is noted that Section 42 of
the Act states the Planning Authority shall consider only the question of the
conditions subject to which planning permission should be granted. This
application therefore does not revisit the principle of development on the site but
only considers the appropriateness of the conditions attached to the previous
consent. In assessing this it remains that there is, however, a requirement to
consider certain aspects of the development. In this case, the applicant seeks not
to comply with the terms of condition 1 of planning permission DC07/233/FUL
which requires landfill operations to cease by 31st December 2022 and restoration
operations to be completed by 2024. 
7.11 The submitted application seeks a 15 year extension to both the operation and site
restoration previously approved and the appropriateness of both an extension to
the operation and the suggested timescale require assessment. Following a full
and detailed assessment as set out below, it is concluded that a short term 
extension would balance the requirement to comprehensively update the position   
relating to ecology and habitat management together with allowing the review and 
Page 25

Page 26

update of the restoration proposals to be brought forward as part of a further full
application which would include the extension to the time for the operation of the
site for a longer period. It is concluded that an additional period of 18 months from
1st January 2023 is appropriate in this respect.
Landscape and Visual Impact
7.12 Landscape character is the distinct and recognisable pattern of elements that
occurs in a landscape leading to the way that it is perceived. Landscape sensitivity
is concerned with the inherent character of the landscape and the likelihood that
this character would be changed by the introduction of development. Landscape
capacity refers to the degree to which a particular landscape type or area is able
to accommodate change without significant effects on its character, or overall
change of landscape character type. A detailed Landscape and Visual Impact
Assessment (LVIA) has been undertaken and is considered as part of the
submitted EIA. The receptors of visual effects include the public at large,
comprising residents, workers, visitors and those travelling through the landscape.
This may include users of public footpaths and core paths. Representative
viewpoints form the basis for the site-based assessment of the potential effects of
the proposed development on views and visual amenity. These viewpoints were
agreed with the Council at the EIA Scoping stage
7.13 The effect of the proposal on the landscape of the area was fully considered during
the assessment of the previous planning application. It was accepted that
progressive landfill and restoration means that there will always be a cell which is
visible and will not blend in to the green backdrop of the landscape and adjacent
restored areas. The cumulative impacts on character were acknowledged to be
slightly adverse for the operation phase (i.e. during landfill operations), but would
become neutral following restoration. 
7.14 The LVIA submitted as part of the EIA for the current proposal for the extension of
time for the previously approved operation and restoration concludes that the
proposed time extension will not result in a change to the landscape character of
the locality beyond that which has already occurred as a result of the ongoing
landfilling and restoration operations. It is highlighted that as most of the restoration
to the western area is complete visibility of the ongoing operations, it will be
reduced as they will be screened from key vantage points by the restored landform.
It is further concluded that there would be no additional impacts on the Kilpatrick
Hills beyond the landfill operation previously consented for the site with the area
well contained visually. It is acknowledged that the existing landfill operation has
created a new skyline feature but with the ongoing progressive restoration, the site
blends with the surroundings. Overall it is concluded that the proposed extension
of time to the existing operations would not give rise to any additional significant
impacts on landscape character or visual amenity.  
7.15 The Loch Lomond and Trossachs National Park Planning Authority raised no
concerns regarding landscape and visual impact from the Park area. Overall, it is
considered the continued operation of the site presents no conflict with Policy E9
of the adopted Local Plan and Policy ENV2 of proposed Local Development Plan
2.
Page 26

Page 27

Ecology and Biodiversity
7.16 Ecological issues are considered by the applicant as part of the submitted EIA and
are informed by a Preliminary Ecological Appraisal. Like matters relating to
landscape and visual impact, matters pertaining to ecology and biodiversity were
also fully considered in the assessment of the previous application. To mitigate
impact, a Habitat Management Plan which outlines the mitigation measures and
how they will be implemented by the applicant was agreed. It is a flexible document
controlled through planning conditions and as part of the legal agreement which
relates to the site. A variety of mitigation measures were agreed and are
implemented via this plan. The EIA considers that the proposal relates to the
continuation of existing landfill operations, the majority of ecological receptors are
likely to be absent from the site and will not be adversely impacted. Nesting birds
may be impacted but mitigation is proposed to ensure damage or disturbance to
active nests is avoided. Overall, it is concluded that there are no significant adverse
impacts to ecological receptors resulting from the continuation of landfill operations
as proposed by the time extension. 
7.17 The Council’s Biodiversity Officer has highlighted that the Preliminary Ecological
Appraisal is considered to be out of date given the time that has elapsed since it
was prepared. The Extended Phase 1 Habitat Survey was undertaken in
September 2018 for example. The Council’s Biodiversity Officer advises that there
are a number of protected habitats and designations in and around the site that
the ecologist has stated are adversely impacted upon, in particular in relation to
the watercourses. Notably, it is recommended that a Landscape and Biodiversity
Management Plan is created. The Biodiversity Officer further advises that the
previous Habitat Management Plan dates from 2008 and ideally, this should be
updated to take account of the current circumstance and to capture the ongoing
habitat loss and/or degradation and offer mitigation. This would be a means of
consolidating all the mitigation into one document. In considering the time
extension alone, the Biodiversity Officer is of the view that the current degradation
of adjacent habitat will now continue for a much longer period than was expected. 
7.18 Given the issues identified by the Council’s Biodiversity Officer in respect of the
validity of the Ecological Appraisal which was carried out some four years ago now,
the need for an updated Habitat Management Plan and full consideration of the
current circumstances in relation to the site, concerns arise from a possible further
15 years of landfill operations on the site. Notably, the current Habitat Management
Plan would be circa 30 years old at the conclusion of the extended period. Whilst
a short term extension could be considered acceptable with reference to Policy E1
and E3A of the adopted Local Plan and Policy ENV1 of proposed Local
Development Plan 2 to allow ongoing operations on the site, the 15 year time
extension as proposed raises concerns. Such a short term time extension of 18
months  to allow the continued operation of the site whilst giving the opportunity
for the applicant to undertake a review of matters relating to ecology, biodiversity
and habitat management proposals and bring forward a revised proposal for
consideration via a further full planning application which considers a longer term
time extension for the site is considered to offer an appropriate balance.
Impact on Water Resources and Flood Risk
7.19 The submitted EIA provides an assessment of the potential impact on the water
environment resulting from the time extension to the operations. In terms of the
Page 27

Page 28

existing planning permission, to prevent groundwater pollution the site
incorporates a lining system, surface water management and leachate
management systems. An internal network of surface water drains and pumps
collected surface water runoff within the operational area and convey it to
settlement lagoons and leachate treatment facilities including reedbeds. The EIA
identified that the increased time to undertake landfilling activities will result in
landfill cells being open for an increased time and accordingly the period within
which leachate is generated, treated and discharged will increase. Increased
timescales will also result in increased volume of leachate. Additional
contamination risks to watercourses may also result. It is noted that an
Environmental Management Plan relating to leachate, surface water and
groundwater for the current operations will be updated to include the time
extension to the operational period. The EIA concludes that with appropriate
mitigation in place to prevent such occurrences, effects would be minor with no
significant impacts on the water environment. It is also concluded there will be no
significant residual effects. 
7.20 Surface water runoff within the operational landfill area is managed in accordance
with a permit under the Pollution Prevention and Control (Scotland) Regulations
2012 which is controlled by SEPA and offers no objections. There is no conflict
with Policy ENV5 of proposed Local Development Plan 2.
7.21 Whilst scoped out of the EIA as a specific topic, the Council’s Scoping Response
advised that a Flood Risk Assessment (FRA) be provided as an appendix to the
EIA. The submitted FRA identifies that the site is located at a higher elevation than
the closest watercourse and is at very low risk of fluvial flooding. The risk of surface
water and ground water flooding is low and the risk of flooding from sewers and
artificial sources is considered to be very low. The FRA acknowledges the existing
drainage regime for the site remain and with this, the risk of flooding to surrounding
areas will not increase. Therefore from a flooding and drainage perspective, no
issues arise from the time extension to the existing operation. SEPA also offers no
objection on flood risk grounds. There is thus no conflict with Policies F1 and F2
of the adopted Local Plan and Policy ENV6 of proposed Local Development Plan
2.
Air Quality
7.22 The potential implications on air quality, dust and odour impacts resulting from the
time extension for the operation of the landfill site have been assessed as part of
the EIA. As set out in the EIA, the landfill site is located approximately 2km from
the urban area and whilst there a number of rural properties found within the wider
landscape, these are a minimum of 800 metres from the landfill site itself. One
residential property is located adjacent to the site entrance, although it is around
1km from the landfill itself. 
7.23 Considering dust, it is recognised that such operations produce dust and this was
fully considered as part of the original planning application. Dusty activities are
mitigated in accordance with a dust management plan which is enforced by the
applicant at all times during day to day operations and this is controlled via the
environmental permit. A review of SEPA inspection reports in relation to this permit
has been undertaken and this indicates that there are some recorded instances of
track out and dirt issues on access routes. This review has informed a proposed
Page 28

Page 29

amendment to the existing dust management plan which when included will seek
to ensure that the access route is kept clean during the extended period of
operation. Overall, it is considered that opportunities for dust generated on site to
impact on neighbouring sensitive receptors such as residential properties is low
and with continued dust management the effects are not significant. As there will
be no change in operations, there will thus be no change in fine particulate matter
emissions from the operation and following assessment it is concluded there is no
risk of air quality objectives being exceeded. 
7.24 Turning to odour, the perception and intensity of odour varies from person to
person. Landfill operations can give rise to odours through waste deposition and
gas generation. The intensity of odours is dependent on the level of generation
and rate of dispersion and odours can be most noticeable during periods of warm
weather and light winds. The majority of odour sensitive locations are located away
from the prevailing wind. Accordingly the risk of odour affecting nearby residential
properties for prolonged periods is considered to be low. The issue of odour is,
however, raised in the objections received. The EIA sets out that following review,
SEPA inspection reports indicate that some odours have been present during
inspections. However, these were only detected in locations nearest to the odorous
sources and not beyond the landfill boundary. Odour emissions have therefore
remained compliant with the permit. The applicant advises that a review of the
existing odour management plan has been undertaken and the existing odour
management plan is considered to continue to offer suitable mitigation. Overall,
the impacts resulting from the time extension of operations is not considered to be
significant. 
Litter
7.25 Litter control issues are currently managed via an existing planning condition and
in accordance with a management plan which is incorporated as an enforceable
condition in the permit under the Pollution Prevention and Control (Scotland)
Regulations 2012issued by SEPA. The site is on a gently sloping hillside which
would be exposed to winds from the south and south-west. It is concluded that with
the continued mitigation as set out in the Management Plan and will ensure that
there are no significant impacts associated with litter.  
Noise
7.26 Noise was scoped out of the EIA. Any noise implications were considered in full
during the assessment of the previous planning application inclusive of surveys
carried out as part of the EIA submitted at the time to determine the levels of
operational noise with respect to residential properties. No concerns arose and it
was concluded that regular noise monitoring was not required due to the distance
of the proposed development from the nearest residential properties.
Environmental Health raise no concerns regarding the ongoing operation of the
site. Whilst the concerns raised in the objections are noted, given the application
does not seek to change the approved operation, this position is considered to
remain valid and no concerns regarding noise to unacceptably disturb
neighbouring property arises. 
Page 29

Page 30

External Lighting
7.27 Concerns are raised in the objections received regarding the impact from external
lighting at the site including excessive illumination, the hours of illumination, the
illumination being intrusive within the rural area and the projection of the lighting
units. External lighting was considered as part of the previous planning application
with condition 10 requiring full details of the external lighting regime to be
submitted. This was provided by the applicant and the terms of the condition
discharged. It is accepted that the nature of the site will result in the provision of
lighting that does not replicate the sporadic lighting from rural properties within the
wider landscape and that for operational and security reasons lighting is required
on site. Notwithstanding the previous discharged of the condition relating to
external lighting, given the time that has elapsed since this, it is considered
appropriate to attach a condition to any new planning permission to extend the
time for the operation of the site to ensure that the impact of external lighting within
the rural landscape is minimised. 
Climate change
7.28 The likely significant effects of the time extension for the operation of the site in
terms of climate change together with risk mitigation in the context of the site,
surrounding area and wider environment is considered in the EIA, recognising that
climate change is a global issue. Whilst the EIA concludes that the operation of the
landfill site does produce CO2 emissions, the impact of the proposal remains the
same as the current landfill operation and there overall effect of the time extension
to the operation of the existing site is neutral. 
Traffic, transport and access
7.29 Whilst scoped out of the EIA, it remains that traffic, transport and access requires
to be considered and the applicant has submitted a Transport Statement in support
of the proposal. The access to the site via Auchencarroch Road is long
established. Auchencarroch road is single carriageway and from the access to the
landfill westwards for around 1350 metres it is around 4 metres wide with passing
places. Auchencarroch Road accesses to the A813. Auchencarroch Road also
forms part of the Core Path Network and National Cycle Network. In granting the
extension to the landfill site in 2008, it was envisaged that there would be a
maximum of 232 HGV movements per day (i.e. 116 arrivals and 116 departures),
and this was a condition of the planning permission. Increased rates of recycling
has reduced the level of waste going to landfill and this has reduced vehicle
movements to a maximum of circa 95 HGV movements per day. With 16 staff
employed on site, there is the potential for a further daily 32 staff vehicle
movements. It is expected that the number of vehicle movements to and from the
landfill during the additional years of operation is no higher than current, hence
users of the transport network would not experience any difference from the
current operation. 
7.30 Concerns are raised in the objections regarding traffic levels on Auchencarroch
Road together with vehicle speeds. The assessment of the application is informed
by a consultation response from the Council’s Roads Service whilst noted that the
site has operated satisfactorily from a roads perspective and accordingly there is
no objection to the continued operation. It is accepted that the extended operation
of the site will, however, to impact on local road users including walkers and
cyclists for a longer period of time. Whilst there would be a concern if the number
Page 30

Page 31

of vehicle movement were to increase, this is not proposed here. It is therefore
accepted that notwithstanding a longer period of operation, there will be no
unacceptable impact on local road users beyond the established position. Matters
relating to speed limits and speed control measures on Auchencarroch Road are
not ones to be addressed via the planning process. 
Recreation
7.31 The operation of the site does not impact on any areas specifically set out for
recreational purposes. Although there are a number of footpaths and a cycle route
within the wider area there are no such paths located adjacent to the landfill. The
proposal to extend the operational period will not have any adverse impact on
existing access and recreational use of the local area.
Built and Cultural Heritage
7.32 Built and cultural heritage was scoped out of the EIA. There are no designated
heritage assets located either within or adjacent to the site. Turning to archaeology,
two features of archaeological interest where identified within the site on the site
and are recorded as being dams associated with the textile/printing industry in the
Leven Valley. At the time West of Scotland Archaeology Service (WOSAS)
recommended a condition requiring the implementation of a programme of
archaeological works to ensure their recording and recovery.  WOSAS were also
consulted in respect of the current application and they advise the time extension
itself would not raise any particular archaeological issue although the requirement
of the existing planning permission for a programme of archaeological works was
highlighted. It is noted that archaeological investigations were submitted following
the granting of the previous planning permission. Overall no additional built or
cultural heritage issues arise from the time extension proposal and there are no
conflicts with Policy BE5 of the adopted Local Plan and Policy BE1 of proposed
Local Development Plan 2.
Restoration
7.33 A restoration scheme was agreed as part of the existing planning permission. This
is based on an approach of progressive capping of the completed landfill cells. The
final restoration includes planting of woodland and linear strips of hedgerow, typical
heathland grass species will be seeded, peat will be stripped and translocated to
the restored profiles forming an acid heathland habitat. The reedbeds and surface
water lagoons will be managed to form wetland areas with diverse planting of
species and a small area will become agricultural grassland forming a permanent
pasture for sheep grazing.  
7.34 It is noted in the EIA that a review of the previously approved restoration plan has
been undertaken with just one minor update relating to a number of small
waterbodies across the site as a means of enhancing habitat creation / biodiversity.
Notwithstanding the applicant’s position within the application submission,
extending the operation and restoration of the site for a further 15 years raises the
concern that by the time the final restoration is being completed, this will be based
on a restoration scheme first considered 30 years previously. It is considered that
any time extension to the operation and restoration of the site for a further 15 years
be accompanied by a comprehensive review of both the continued
appropriateness of the current restoration proposals together with the potential
deliverability given the likely implications for the operation of the business with the
Page 31

Page 32

reduction of waste going to landfill resulting from continued increases in recycling
together with restrictions on the use of landfill being introduced from 2025. The
applicant have themselves advised that in further considering the operation of the
site in the time since the submission of this application which is inclusive of a period
where the application was on hold at the applicants request, the wider commercial
context for landfill sites in Scotland has changed dramatically over the last few
years. With the introduction of the forthcoming landfill ban the revenues of all
landfill sites will fall significantly,  in line with the reduction of waste being landfilled.
At the time the current restoration plan was prepared the income of the site was
significantly higher, and a review of the restoration scheme to ensure long term
deliverability on site is now required in this context. 
7.35 As set out above, this application has been submitted under Section 42 of the Act.
In the context of the submitted application, all that can be considered is the
appropriateness of a time extension relating to the landfilling operation and
restoration as approved by planning permission DC07/233/FUL. It is beyond the
scope of the assessment of this application to consider amendments to the
approved landfilling operation or indeed the approved restoration. Whilst the
applicant seeks a 15 year time extension for the site it is not, however, beyond the
scope of this application to conclude that an alternative time extension period,
either shorter or longer, will be appropriate. In this case, it is acknowledged that
the current planning permission for the operation of the site expires at the end of
this year and that the site not only provides employment but provides an important
waste disposal operation. However, this must be balanced with all relevant
considerations and giving the above matters relating to the appropriateness and
deliverability of the restoration scheme a 15 year time extension for the approved
operation and restoration is not considered appropriate. Notwithstanding this, a
short term extension of 18 months to allow the continued operation of the site
would give the opportunity for the applicant to undertake a review of the restoration
proposals and bring forward a revised proposal for consideration via a further
planning application. Following detailed discussions, the applicant has confirmed
that they accept such an approach, and they would bring forward a further full
application on this basis. 
Restoration Bond 
7.36 A restoration bond is required to be set in place to ensure that there will be
sufficient funds to cover the detailed level of restoration required. The Council
holds a bond of a value of £120,000 during active landfilling operations with
reduced amounts held for a 30 year period following the cessation of the landfilling
operations and this was secured at the time of previously granting planning
permission. However it is acknowledged that this bond requires to be increased.
The applicant is agreeable to providing an increased bond to a value of circa 
£1 million and this can be secured by way of an updated legal agreement prior to
the issue of any planning permission. Such an approach follows the aims of Policy
MIN2 of proposed Local Development Plan 2.
The Landfill (Scotland) Regulations 2003
7.37 Regulation 5 of the Landfill (Scotland) Regulations 2003 requires that the Planning
Authority consider certain matters when deciding on the suitability of a landfill site.
These include matters such as the distances from the boundary of the site to
residential and recreational areas, the waterways, water bodies and other
Page 32

Page 33

agricultural or urban sites and the protection of the natural or cultural heritage in
the area. It is considered that all the requirements under these regulations have
already been met both through the assessment of the original planning application
and through the submission of the EIA in support of this planning application. The
proposal is not considered to raise any adverse issues.
EIA Conclusions
7.38 The EIA considers various iterations  taking into account new landfill rates and the
upcoming restrictions of landfill waste. A proposed 15 year extension to time is
considered in the EIA as the preferred option although this does not preclude the
planning application assessment concluding an alternative time period for the
extension is appropriate. Given the proposal relates to an existing site, it is
concluded that alternative sites for landfill do not require to be considered. 
7.39 The EIA concludes that any impacts from the time extension of the landfill
operation will continue to be offset by way of the comprehensive mitigation
measures on the site as identified in specific sections of the EIA, supporting
documentation and by the approach of progressive restoration and revegetation.
Management plans are, and will continue to be in place including as a requirement
of the PPC permit. The EIA has concluded that with the continued mitigation the
proposal to extend the operation of the site will not lead to any unacceptable
impact. 
Public Engagement
7.40 As the planning application was submitted under Section 42 of the Town and
Country Planning (Scotland) Act 1997 (as amended), there are no public
engagement requirements that the applicant must follow prior to the submission of
the planning application. Notwithstanding this, the applicant advises that prior to
the submission of the application an information leaflet was distributed to
neighbouring properties and this included details relating to the operations at
Auchencarroch and the forthcoming application. This included the contact details
of the applicant and their agent should there be any questions. 
8. CONCLUSION
8.1 This proposal involves an extension to the time for the operation of an existing
landfill site which is facilitated by the lower than expected landfill rates due to
increased recycling and a reduction in waste being sent to landfill. This application
considers only the extension to the time for the operation of the site with no
changes proposed to the operations themselves or the restoration scheme. It
remains that the landfill operations are progressive and as each cell is filled
restoration works begin. The completed site would result in a low hill with heathland
habitat and some sporadic woodland, reflecting the landforms adjacent but at a
lesser height than Auchencarroch Hill and Pappert Hill. The finished levels would
continue those of the existing restored cells. No additional land will be developed
by the proposal beyond the currently consented position. 
8.2 The site comprises an important existing waste management facility which is
fundamental to the city regions ongoing waste management requirements and the
continued operation of the existing site to utilise consented capacity over a longer
period of time and does not conflict with the vision of Clydeplan. Both the adopted
Page 33

Page 34

West Dunbartonshire Local Plan and proposed West Dunbartonshire Local
Development Plan 2 identify the site as a waste management facility with Policy
PS1 of the adopted Local Plan identifying the site as an established public utility
which the policy seeks to protect. Policy ZW1 identifying the site as suitable for the
management of waste. The site currently has existing infrastructure in place that
is suitable for its continued use, is sited in an appropriate location and will continue
to provide a waste disposal facility and it is not considered there is any conflict with
the aims of National Policy. 
8.3 In assessing the submitted EIA, all supporting documentation and taking account
of all material planning considerations, it is concluded that an extension of the time
for the operation of the landfill site is considered acceptable with reference to
landscape and visual impact, water resources and flood risk, air quality, litter,
climate change, traffic, transport and access, and recreation. Concerns arise,
however, in respect of matters relating to ecology and the restoration proposals 
8.4 The Ecological Appraisal was carried out some four years ago and it is noted that
there was also a period where the submitted application was on hold at the request
of the applicant. The need for an updated Habitat Management Plan and full
consideration of the current circumstances in relation to the site are accepted and
require to be addressed.  Concerns therefore arise from a possible further 15 years
of landfill operations on the site and the current habitat management plan would
be circa 30 years old at the conclusion of the extended period. A short term
extension would balance the requirement to comprehensively update the position
relating to ecology and habitat management whilst balancing the continued
operation of the facilities the site provides. The continued appropriateness and
deliverability of the restoration scheme also raised concerns and it is not
considered a 15 year time extension is appropriate. Notwithstanding this, a short
term extension to allow the continued operation of the site would allow the
continuation of operations on site in the short term whilst allowing the opportunity
for the review and update of the restoration proposals to be brought forward as
part of a further full application which would include the extension to the time for
the operation of the site for a longer period. It is concluded that an additional period
of 18 months from 1st January 2023 is appropriate in this respect. 
8.5 It remains that the environmental impacts will continue to be safeguarded via the
terms of the existing legal agreement with a review inclusive of an increased
restoration bond value being concluded prior to the issuing of planning permission.
8.6 Finally, the Council has a contractual arrangement with the applicant for the
disposal of waste. However as the development is not contrary to the development
plan, it does not require to be notified to the Scottish Ministers under the Town &
Country Planning (Notification of Applications) Direction 2009.
9. CONDITIONS
1. The development hereby permitted shall ensure for the benefit of the applicant only
with the approved landfill operations to be completed by 30th June 2024 and the
final restoration of the site by 30th June 2026 unless otherwise agreed in writing by
the Planning Authority.
Page 34

Page 35

2. At all times during the lifetime of this permission, the landfill operations on site, the
operational conduct of the site and the restoration of the site shall be undertaken
as indicated in the Environmental Impact Assessment dated November 2020
together with all supporting documentation, plans and details that forms part of this
application. For the avoidance of doubt, the landfill operations shall be undertaken
and completed progressively as approved.
3. Except in the case of emergency the hours of working of the site shall be restricted
to between the hours of 7.30am to 5.00pm Monday to Saturday only and not on a
Sunday or on a recognised Public Holiday in West Dunbartonshire without the prior
written approval of the Planning Authority with the exception of essential site
maintenance and the maintenance of plant and machinery. Access to and exit from
the site shall be by way of Auchencarroch Road.
4. The number of deliveries of landfill material to the site shall not exceed 116 in any
one working day.
5. The site operator shall be responsible for the maintenance of a vehicle register log
book of all deliveries to the site which shall be available for inspection by the
Planning Authority upon request at any time.
6. The applicant shall be responsible for the collection and disposal of any windblown
material emanating from the area of infill or deposited from vehicles on or around
Auchencarroch Hill and Auchencarroch Road.
7. No burning of materials in connection with the infilling operations shall take place
on or adjoining the site.
8. That within 8 weeks of the date of this permission, the applicant shall undertake a
review of external lighting of the site and shall submit full details setting out how
the impact of external lighting on the site shall be minimised in the landscape. For
the avoidance of doubt this shall include full details of all existing and lighting at
the site, details of the hours of illumination, location, height, angles, power rating,
projection and any hoods or baffles to direct light. Any amendments of
recommendations in relation to external lighting shall be fully implemented within
8 weeks of the date the details are agreed in writing by the Planning Authority.
9. The annual monitoring on the progress of the mitigation areas shall be carried out
as required by the Habitat Management Plan and by the applicant or by any person
engaged by them. An annual report will be made available to the Technical
Working Group at least 3 weeks prior to the formal review meeting of that Group
and the annual monitoring report shall be approved by the Planning Authority.
10. The approved Habitat Management Plan dated July 2008 shall continue to be fully
implemented in connection with the operation of the site.
11. All advance works, including habitat translocation to receptor areas for landfill
restoration shall take place outside the bird nesting season (March to July
inclusive) unless a checking survey confirms the absence of nests. The checking
survey shall be carried out at a time and approved in advance by the Planning
Authority.
Page 35

Page 36

12. All diversions of watercourses shall follow the details approved in respect of
condition 18 of planning permission DC07/233/FUL.
13. The access track which runs partly through the active landfill and links up with the
track leading to Paper Muir and the western edge of the commercial forestry
plantation shall not be used for the export of timber without the prior written
approval of the Planning Authority.
14. On completion of the landfill operations, except in so far as may be required for
leachate and gas monitoring, the site shall be cleared of all buildings, plant and
machinery with details of the phasing of this to be submitted for the approval of the
Planning Authority prior to the cessation of landfill operations on site.
15. Appropriate measures to prevent mud, dirt, dust, slurry or stones being carried
onto the highway shall be taken and such steps shall include the provision and the
use of hard standing areas and a wheel wash facility for the cleaning of all lorries,
dump trucks, other heavy vehicles and plant leaving the site.
16. The access road and public road adjacent to the site shall be kept clear of mud or
other deposited materials at all times by means of mechanical brushing.
17. All road vehicle transporting waste to site shall be suitably covered/happed to
ensure there is no escape of materials. Where appropriate, vehicles leaving the
site shall also be happed to minimise traffic noise associated with empty vehicles.
18. Soils to be imported to the site shall share similar profile characteristics as the soil
structure currently on site. Topsoil and sub-soil shall only be stripped when the
soils are sufficiently dry so that when moved, no damage will be done to the
structure of the soils. Apart from the works required to enclose the site, no
operations shall be carried out until the topsoil is fully stripped and stored in the
designated areas within the site.
19. Topsoil shall be stripped to full available depth from all areas within the site except
those areas designated in the approved plans as topsoil dumps. Following topsoil
stripping operations from any areas of land, sub-soil shall be stripped as a separate
operation to a depth, where possible, to achieve topsoil and sub-soil not less than
0.9 metre at restoration.
20. Topsoil and sub-soil shall be carefully stored in separate dumps and prevented
from mixing. Topsoil dumps shall not exceed 5 metres in height. Topsoil dumps
and sub soil dumps shall be evenly graded and tops shaped to prevent water
ponding. Sub-soil dumps shall not exceed 8 metres in height.
21. In the first available seeding season following their formation, all mounds of topsoil,
sub-soil and soil making materials shall be seeded in grass and shall be so
maintained until the soils are required for use in the restoration of the site except
as may be otherwise agreed with the Planning Authority.
Page 36

Page 37

22. All water treatment areas and settlement lagoons shall be enclosed by a one metre
high stock-proof fence and shall be implemented prior to any significant soil
stripping.
23. Appropriate precautions shall be taken to prevent the discharge of oil from fuelling,
oil storage, plant maintenance and vehicle wash areas within the site.
24. Dust monitoring shall be routinely carried out by the applicant and undertaken
using appropriate equipment and recording devices. The results and records shall
be made available to the Planning Authority on a monthly basis during the
operational life of the site.
25. Noise monitoring programme shall be undertaken during the operational life of the
site using appropriate equipment and recording devices, the results of which shall
be made available to the Planning Authority on a monthly basis.
26. The total waste landfilled on site shall not exceed 225,000 tonnes (net) per year.
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 16th November 2022  
______________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application documents and plans
2. Clydeplan Strategic Development Plan 2017
3. West Dunbartonshire Local Plan 2010
4. West Dunbartonshire LDP - Proposed Plan 2
5. National Planning Framework 3
6. Scottish Planning Policy 2014
7. Scotland’s Zero Waste Plan 2010
8. The Landfill (Scotland) Regulations 2003
9. Consultation responses
10. Representations
11. Planning permission DC07/233/FUL
Page 37

Page 38

¯
0 0.2 0.4 0.6 0.8
km
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 01/11/2022.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:12,500@A4
01/11/2022
DC20/253West Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
Page 38
I T E M 6 - A P P E N D I X 1

Page 39

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 16 November 2022
_____________________________________________________________
Subject: Local Development Plan 2 - Supplementary Guidance
1. Purpose
1.1 To advise the Committee of the outcome of consultation on draft
Supplementary Guidance and seek approval of finalised version of the
Guidance.
2. Recommendations
2.1 It is recommended that the Committee approve the finalised versions of
Supplementary Guidance as set out in the Appendices:
• Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
(Appendix 1)
• Creating Places (Appendix 3)
• Green Network and Green Infrastructure (Appendix 5)
3. Background
3.1 The purpose of Supplementary Guidance is to add more detail to the
content and policies of the Local Development Plan. Under the Planning
(Scotland) Act 2006, guidance referred to in the Local Development Plan
could be prepared as statutory Supplementary Guidance, and if so, would
form part of the Development Plan once adopted. Whilst this will no longer
be the case under the Planning (Scotland) Act 2019 (i.e. guidance can still
be prepared but will not form part of the statutory development plan),
transitionary arrangements allow for guidance associated with Local
Development Plans prepared under the 2006 Act (e.g. LDP2) to be
prepared as statutory Supplementary Guidance and form part of the
development plan.
4. Main Issues
4.1 The draft Supplementary Guidance on Green Network and Green
Infrastructure and Creating Places was approved at Planning Committee
on 16 February 2022 and published for consultation on 12 May 2022. The
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site was
approved at Planning Committee on 8 June 2022 and published for
ITEM 7
Page 39

Page 40

consultation on 29 June 2022. The consultation period for all three
documents ended on 12 August 2022. The consultation was promoted
through direct contact with the Council’s Local Development Plan
participants, promotion through Council social media, and notices in local
press. The documents were made available online, in the Council’s Church
Street offices and in Council libraries. Details of the responses received
and the changes made to each document are set out below.
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
Supplementary Guidance
4.2 The Antonine Wall guidance firstly sets out the policy background and
requirements for development within the World Heritage Site or the buffer
zone. It then provides detailed guidance and advice for developers with
proposals within the protected areas in terms of how to assess any
potential impacts of development on the World Heritage Site and buffer
area; for instance relating to the landscape setting and any physical
impacts on archaeological remains above and below ground. The
document then sets out the necessary actions and steps to be taken in the
pre-application stage, and what information is required to be provided to
the planning authority. It also provides design advice for developers on
how to avoid or mitigate any impacts on the World Heritage Site and buffer
area, as well as setting out enforcement steps for any breaches of planning
control.
4.3 Three responses were received during the consultation period. Details of
responses received and the Council’s proposed response to these is set
out in Appendix 2. The main response was from Historic Environment
Scotland, which sought changes to wording of the guidance, both for
clarification purposes and to strengthen protection of the Antonine Wall
and its buffer zone.
4.4 Only the Historic Environment Scotland comments necessitated changes
to the draft Supplementary Guidance, and as the document had already
been consulted on by other Antonine Wall authorities, many of the changes
being sought by the response had already been incorporated into the
document. The additional changes requested by Historic Environment
Scotland were minor in nature and are shown as tracked changes in the
version attached for approval at Appendix 1.
Creating Places Supplementary Guidance
4.5 The Creating Places guidance supports the Creating Places policies of
LDP2. It details the process for successful placemaking including the
support that the Council will provide through its Pre-Application Service
and Place & Design Panel. The guidance uses examples to highlight how a
well-considered design led approach can contribute to successful and
Page 40

Page 41

sustainable places. Using examples, many of which are from
developments in West Dunbartonshire, the guidance supports innovative
and creative design without being prescriptive about architectural styles
and details.
4.6 Ten responses were received during the consultation period. Details of the
responses received and the Council’s proposed response to these is set
out in Appendix 4. Many responses sought wording changes to clarify and
strengthen the document. A response from the housebuilding industry
queried procedural issues around the status of the guidance. A
strengthening of reference to habitats and horse-riding was sought in
different responses.
4.7 The changes made to the draft document are shown as tracked changes in
the version attached for approval at Appendix 3. These changes include:
• Clarification of the status of the document
• Removal of references to the emerging National Planning Framework 4, as
these are premature
• Information relating to the use of SuDS in areas with a mining legacy
• Strengthening of Habitat Enhancement section
• Reference to ‘all users’ including horse riding in Access networks section
• Clarification of the need for neighbourhood uses for mixed use on larger
development sites
Green Network and Green Infrastructure
4.8 The Green Network/Green Infrastructure Guidance sets out the policy
principles and requirements for green infrastructure to be delivered within
or associated with new development, and how this will link into West
Dunbartonshire’s green network. The guidance sets out how green
infrastructure should be embedded in new development and what types of
green infrastructure should be provided within different development types.
It then focuses on residential development, setting standards for the
provision of open space in relation to accessibility, quality and quantity. It
also sets out the circumstances under which developer contributions will
be sought and how these will be calculated.
4.9 Ten responses were received during the consultation period. Details of the
responses received and the Council’s proposed response to these is set
out in Appendix 6. Many of the responses sought wording changes to
clarify and strengthen the guidance. Responses from the housebuilding
industry queried procedural issues around the status of the guidance and
the approach to seeking developer contributions. A number of responses
queried the availability of open space audit information. The relationship
between the accessibility, quality and quantity standards set out in the
guidance was queried, particularly with regard to how these related to the
Page 41

Page 42

worked examples included in an appendix to the guidance. A response
from a local resident was received seeking stronger reference to horse-
riding and equestrian facilities in the document.
4.10 The changes made to the draft document are shown as tracked changes in
the version attached for approval at Appendix 3. These changes include:
• Clarification of the status of the document
• Changes to the definition of greenspace and green infrastructure
• Requiring an overall net gain in quantitative or qualitative provision of
green infrastructure/open space, if any is lost through development
• Strengthen references to multi-user and multi-function green infrastructure
• Strengthen requirement for habitat provision/enhancement
• Clarifying relationship between the quantity standard and the accessibility
and quality standard
• Clarifying that a ‘hybrid’ approach of on-site provision and financial
contribution to off-site provision is acceptable.
• Including information on the open space audit
Next steps
4.11 On approval, the finalised versions of these documents will become
material considerations in planning decisions and will supersede the
following existing guidance documents:
• Frontiers of the Roman Empire (Antonine Wall) World Heritage Site (2011)
• Residential Development: Principles for Good Design (2014)
• Our Green Network (2015)
4.12 If the Council adopts the associated Local Development Plan (LDP2) at a
future date, the Council will then seek to adopt the supplementary
guidance documents as part of the development plan. This will involve
notifying the Scottish Ministers of our intention to adopt the documents. At
that stage, Scottish Ministers scrutiny is likely to focus on ensuring that the
principles of good public involvement and a proper connection with the
development plan have been achieved, rather than on detailed policy
content, which the Scottish Government has already commented on at the
consultation draft stage.
5. People Implications
5.1 There are no people implications associated with this report.
6. Financial and Procurement Implications
6.1 There are no financial or procurement issues associated with this report.
Page 42

Page 43

7. Risk Analysis
7.1 There are no risks associated with this report.
8. Equalities Impact Assessment (EIA)
8.1 The draft Supplementary Guidance documents were subject to equality
impact assessments. These found that the documents had a wide range of
positive impacts with no groups with protected characteristics
disadvantaged and no negative impacts identified. The proposed changes
to the documents are not considered to amend these conclusions.
9. Environmental Sustainability
9.1 The documents have been the subject of Strategic Environmental
Assessment screening concluding that they will not have significant
environmental impacts.
10. Consultation
10.1 Consultation has been undertaken on the draft Supplementary Guidance
documents as set out in paragraph 4.1.
11. Strategic Assessment
11.1 The supplementary guidance is considered to align with the Council’s
Strategic Priorities, particularly:
Our Communities – Resilient and Thriving
Our Environment – A Greener Future
Pamela Clifford
Planning, Building Standards and Environmental Health Manager
Date: 16 November 2022
_________________________________________________________________
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager
pamela.clifford@west-dunbarton.gov.uk
Alan Williamson, Development Planning & Place Team
Leader
alan.williamson@west-dunbarton.gov.uk
Page 43

Page 44

Appendices: 1. Frontiers of the Roman Empire (Antonine Wall)
World Heritage Site – finalised version
2. Frontiers of the Roman Empire (Antonine Wall)
World Heritage Site – comments received on draft
version and Council’s proposed response
3. Creating Places – finalised version
4. Creating Places – comments received on draft
version and Council’s proposed response
5. Green Network and Green Infrastructure – finalised
version – comments received on draft version and
Council’s proposed response
6. Green Network and Green Infrastructure –
comments received on draft version and Council’s
proposed response
Background Papers: ‘Development Planning Update’ report to Planning
Committee, 16 February, 2022
‘Frontiers of the Roman Empire (Antonine Wall) World
Heritage Site Supplementary Guidance’ report to
Planning Committee, 8 June 2022.
Wards Affected: All
Page 44

Page 45

ITEM 7 - Appendix 1
Local Development Plan 2
Frontiers of the Roman Empire (Antonine Wall)
World Heritage Site
Supplementary Guidance
November 2022
Page 45

Page 46

This document incorporates amendments following consultation on the draft
Supplementary Guidance in 2022. If/when the associated Local Development
Plan (LDP2) is adopted, this document will be submitted to the Scottish
Government for approval to adopt. Until that time it will be a material
consideration in the determination of planning applications.This document is
also available in other languages, large print and audio format on request.
Please contact Corporate Communications at:
Address: West Dunbartonshire Council, Council Offices, 16 Church Street
Dumbarton, G82 1QL 
Phone: 01389 737527 
Email: Communications@west-dunbarton.gov.uk
Arabic
Hindi
Punjabi
Urdu
Chinese (Cantonese)
Polish
British Sign Language
BSL users can contact us via contactSCOTLAND-BSL, the on-line British
Sign Language interpreting service. 
Find out more on the contactSCOTLAND website
Page 46

Page 47

Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
Supplementary Guidance 
Contents: 
1. Introduction 
1.1 Section 1 Introduction
1.2 Purpose of Supplementary Guidance 
1.3 The Antonine Wall 
1.4 The Frontiers of the Roman Empire World Heritage Site 
1.5 Buffer Zone 
1.6 Protecting the Wall 
2. Application Process 
2.1 Section 2 Introduction
2.2 Site Audit 
2.3 Pre-Application Discussions 
2.4 Environmental Impact Assessment 
2.5 Scheduled Monument Consent 
2.6 Permitted Development and Other Consents 
3. Assessing the Impact of Development 
3.1 Section 3 Introduction
3.2 Physical Impacts 
3.3 Impacts on Setting 
3.4 Cumulative Impacts 
3.5 Adding Value 
3.6 Other Planning Policies and Assessments 
4. Design and Mitigating Impacts 
4.1 Section 4 Introduction
4.2 Design Criteria 
4.3 Mitigation 
4.4 Enforcement 
Appendix 1 - Statement of Outstanding Universal Value 
Appendix 2 - Summary of Key Points 
Appendix 3 - Glossary
Appendix 4 - General Information and Contacts 
Appendix 5 - Map of Antonine Wall and Council Areas
Appendix 6 - The Antonine Wall Then and Now  
Page 47

Page 48

1. Introduction
1.1 SECTION 1 INTRODUCTION
1.1.1 This Supplementary Guidance provides advice for developers, decision
makers and the public on managing the impact of development on the
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
(FRE(AW)WHS) and its setting. The guidance supports the
implementation of the development plan policies agreed by the five
Councils along the Antonine Wall: Falkirk, North Lanarkshire, East
Dunbartonshire, Glasgow City and West Dunbartonshire.
1.1.2 The Guidance will be a material consideration in the assessment and
determination of planning applications affecting the Antonine Wall and
its setting. It will then be progressively adopted as statutory
Supplementary Guidance alongside the emerging Local Development
Plans being prepared by the five local authorities.
1.2  PURPOSE
1.2.1 The purpose of the SG is to:
▪ explain the significance of the Antonine Wall and its status as a
World Heritage Site;
▪ encourage early and effective consultation with Councils and
Historic Environment Scotland;
▪ outline the approach and procedure for assessing development
affecting the World Heritage Site;
▪ set out the criteria which will be applied in determining planning
applications for development along the line of,  and within the
setting and vicinity of the World Heritage Site;
▪ guide decisions on planning appeals and enforcement.
1.3 THE ANTONINE WALL
1.3.1 The Antonine Wall is the most substantial and important Roman
monument in Scotland. Built on the orders of the Emperor Antoninus
Pius in the years following 140 AD, it extends for some 60 kilometres
across central Scotland from Bo’ness on the River Forth to Old
Kilpatrick on the River Clyde and marked the north western frontier of
the Roman Empire.
1.3.2 The Wall functioned both as a frontier control and military defence. It
comprised of a substantial turf rampart built on a solid stone base
fronted to the north by a broad, deep ditch and outer mound. To the
south of the rampart was a road, the Military Way, which permitted the
movement of troops, goods and materials and connected the series of
permanent stone built forts which occur at roughly two mile intervals
along its length. Between some of the forts there are smaller forts, or
Page 48

Page 49

fortlets. Camps used by the troops building the Wall also occur at
regular distances along the frontier. 
1.3.3 The Antonine Wall is of great significance for a number of reasons. It
represents one of many sections of a massive military system which
stretched over 5000 km from northern Britain, through Europe to the
Black Sea, and from there to the Red Sea and across North Africa to
the Atlantic coast. This frontier helped to protect – and define – the
Roman Empire, one of the greatest states ever to have existed. The
Antonine Wall was the most northerly frontier of the Empire, the last of
a series of planned frontiers built in the 2nd Century AD and, at the
time, the most complex ever constructed by the Romans. 
1.3.4 Today around one third of the Antonine Wall is visible above ground, at
places such as Bearsden, Bar Hill and Rough Castle. Around one third
lies in urban areas while the remainder lies in open countryside or open
spaces within urban areas and, though not visible above ground,
survives below ground. Only 2 km of the original 60 kilometres of the
Antonine Wall have been completely lost through quarrying and the
construction of roads, railways and the Forth and Clyde Canal. The
Wall continues to be subject to considerable development pressures
and given its significance it is imperative that the remaining sections –
whether visible on the ground or not – are safeguarded from
inappropriate development. 
1.4 THE FRONTIERS OF THE ROMAN EMPIRE (ANTONINE WALL)
WORLD HERITAGE SITE – FRE(AW)WHS 
1.4.1 In July 2008 the international cultural and archaeological importance of
the Antonine Wall was recognised when the World Heritage Committee
of UNESCO inscribed the site as Scotland’s fifth World Heritage Site
(WHS). The Antonine Wall became an extension of the trans-national
Frontiers of the Roman Empire World Heritage Site which includes
Hadrian’s Wall in England and the Upper Raetian German Limes. The
intention is that the WHS will eventually include all surviving sections of
the frontiers of the Romans in Europe, Africa and the Middle East. 
1.4.2 With World Heritage Site status comes a commitment to protect the
exceptional cultural significance of the Antonine Wall and Outstanding
Universal Values (OUV) for which the site was inscribed. The
Statement of Outstanding Universal Value, provided at Appendix 1, not
only identifies the reasons for the Wall’s inscription as a World Heritage
Site but provides the basis for its effective protection and management. 
1.4.3 It is imperative that development does not compromise the values for
which the Antonine Wall was inscribed as a World Heritage Site, its
authenticity and integrity.  
Page 49

Page 50

1.5 BUFFER ZONE 
1.5.1 To protect the important landscape setting of the Antonine Wall a
Buffer Zone has been designated to the north and south of the
monument. The Buffer Zone does not act as an absolute barrier to
development but defines a zone where added protection to the
immediate setting of the World Heritage Site is given.  Development
proposals within the buffer zone will be given careful consideration to
determine whether it is likely to significantly detract from the
Outstanding Universal Value authenticity or integrity of the Antonine
Wall World Heritage Site. 
1.5.2 Section 3 Assessing the Impact of Development provides further
guidance on Buffer Zone and the setting of the Antonine Wall.
The boundaries of the World Heritage Site and the Buffer Zone are
shown in Figure 1, below, as well as on the Proposals Maps of the
relevant local plans/local development plans listed in Appendix 4. 
Figure 1: The Antonine Wall, World Heritage Site and Buffer Zones 
Page 50

Page 51

1.6 PROTECTING THE WALL 
1.6.1  World Heritage Site designation does not result in additional direct
legal protection. Nevertheless, the Antonine Wall is protected through
the planning system and in some areas through designation as a
scheduled monument. 
Scottish Planning Policy 
1.6.2 Scottish Planning Policy (SPP) provides a statement of the Scottish
Government’s policy on nationally important land use matters. The
Historic Environment Policy for Scotland (HEPS) sets out the Scottish
Governments policies for the historic environment and provides policy
direction. Paragraph 147 of SPP refers to World Heritage Sites and
states that “Where a development proposal has the potential to affect a
World Heritage Site, or its setting, the planning authority must protect
and preserve its Outstanding Universal Value.” The glossary of SPP
clearly defines the term ‘Outstanding Universal Value’ and emphasises
that the Statement of OUV is the key reference for the future effective
protection and management of the WHS. The glossary also clearly
defines setting.  SPP emphasises that setting is more than simply the
immediate surroundings of a site. It can also relate to how the site was
intended to fit into the landscape, the views from it and how the site is
seen from the surrounding area. Planning Advice Note (PAN) 2/2011:
Planning and Archaeology and the Managing Change in the Scottish
Environment Guidance Notes complete a suite of documents that
together set out the Scottish Ministers’ policies for planning and the
historic environment. Links to all the documents mentioned are listed in
Appendix 4. 
Development Plan Policy 
1.6.3 Decisions on planning applications require to be made in accordance
with the development plan unless material considerations indicate
otherwise. The local development plans of each Council include
policies to protect and enhance the historic environment and
archaeology. National planning policy on the historic environment is
also a material consideration for applications 
1.6.4 Each of the five Councils along the Antonine Wall has also agreed to
include the following specific planning policies on the Antonine Wall
and its buffer zone in their development plans as they are revised and
updated. This document provides additional guidance and information
on the implementation of these policies in the development
management process.  
Page 51

Page 52

Antonine Wall Policy 1
There will be a presumption against development which would have an
adverse impact on the Frontiers of the Roman Empire (Antonine Wall)
World Heritage Site as defined on the Proposals Map. 
Antonine Wall Policy 2
There will be a presumption against development within the Frontiers
of the Roman Empire (Antonine Wall) World Heritage Site buffer zones
which would have an adverse impact on the Site and its setting, unless:
▪ mitigating action to the satisfaction of the Council in consultation
with Historic Environment Scotland can be taken to redress the
adverse impact; and
▪ there is no conflict with other Local Development Plan policies. 
1.6.5 In addition to protection under planning legalisation, about two-thirds of
the Wall which has remained unaffected by modern development, is
scheduled as a monument of national importance under the Ancient
Monuments and Archaeological Areas Act 1979. Most works carried
out within the boundaries of the monument require Scheduled
Monument Consent (SMC): the prior written consent of Historic
Environment Scotland. SMC is separate from planning consent and
one can be given without prejudice to the other. Section 2.5 provides
more information. 
KEY POINTS 
▪ This document provides advice for decision makers, developers and
members of the public on managing the impact of development on the
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
and its setting; 
▪ The Supplementary Guidance is a material consideration in the
assessment and determination of planning applications affecting the
Antonine Wall and its settings and will be adopted as statutory
Supplementary Guidance, which forms part of the  Local Development
Plan; 
▪ The Antonine Wall is of international significance. As a World
Heritage Site its outstanding universal value, authenticity and integrity
must be protected. 
▪ There is a presumption against development which would have an
adverse impact on the Antonine Wall and its setting. 
Page 52

Page 53

2. Application Process 
2.1 SECTION 2 INTRODUCTION 
2.1.1 This section provides guidance on key stages in the process of
applying for planning permission where a proposed development may
have an impact on the FRE(AW)WHS or its setting. It also identifies
where other permissions or assessments may be required, for example
scheduled monument consent from Historic Environment Scotland. 
2.2  SITE AUDIT 
2.2.1 Developers considering proposals within the WHS and Buffer Zone
should look carefully at their site to determine whether the development
proposed is likely to have an impact on the fabric or setting of the
Antonine Wall. Table 1 below outlines some of the key information that
will influence whether proposals have an adverse impact, and should
be discussed with the Council at the pre-application stage. Adverse
impacts are examined further in Chapter 3. 
Table 1 – Site Audit; Key Questions 
Factor Key Questions 
Location Is the site in:
• World Heritage Site
• Buffer Zone
• Other designated area
• Scheduled Monument
Site
characteristics
and setting 
Is the site:
• Greenfield
• Previously developed 
What are the key landscape characteristics:
• Topography
• Tree cover
• Enclosed or open 
What is the landscape character of the site and its
setting? 
What is the cultural significance and historic
importance of the existing site characteristics and
setting? 
How will the proposal impact on views to/from the
Antonine Wall? 
Will the proposal affect existing public access to
the World Heritage Site?
Page 53

Page 54

Will the proposal have a direct impact on the
remains of the Antonine Wall and associated
archaeological features? 
Development
Characteristics 
• Size/footprint
• Proposed Use
• Building design  and
materials/scale/height/form/massing
• Landscaping proposals including boundary
treatment 
Development
Plan Policies
What other planning policies and designations
apply to the site? 
2.2.2 It is emphasised that the general principle of new development at any
specific location may be deemed unacceptable because of other
policies in the development plan. For example green belt, open space
and countryside protection policies may rule out the principle of
particular types of development or land use. 
2.3 PRE-APPLICATION DISCUSSIONS 
2.3.1 Developers will be expected, as early as possible, to engage with
the Council in pre-application discussions. Contact details for each
local authority are provided in Appendix 4. 
2.3.2 Early, positive and meaningful engagement will allow unacceptable
proposals to be identified before significant costs are incurred and
allow other projects to move forward more efficiently. Using Table 1
above as a basis, along with any available plans, drawings,
photographs or photomontages and documentation, developers should
aim to provide the Council with as much information as possible
relating to the proposed development and the site. 
2.3.3 With suitable information the Council will be able to make a preliminary
assessment of the proposal, considering relevant development plan
policies and the potential for adverse impacts on the WHS and its
setting. Discussions may also cover: 
▪ any additional information required, for example detailed
archaeological investigations, landscape assessments etc.;
▪ where a proposal might be amended to allow more favourable
consideration (see Section 4);
▪ the Council’s procedure for processing applications, including
key contacts and application fees (including any advertisement
charges);
▪ where wider consultation is required with specialist
archaeological services, statutory organisations and other
Page 54

Page 55

interest groups. This may also involve statutory Pre-Application
Consultation.
▪ advice on other relevant statutory processes, e.g. Listed
Building/ Conservation Area Consents, Scheduled Monument
Consent. 
2.3.4 In many circumstances, only full applications for Planning Permission
will be acceptable for sites within the WHS and Buffer Zone.
Applications for Planning Permission in Principle often cannot provide
sufficient information to enable detailed assessment of impacts on the
WHS or its setting. Where Planning Permission in Principle is sought,
the reasons for this should be discussed with the Council at this pre-
application stage. 
2.3.5 All discussions and pre-application advice is given without prejudice to
the final decision of the Council on any application that may be
submitted. 
2.4 ENVIRONMENTAL IMPACT ASSESSMENT 
2.4.1 Certain types of developments may require Environmental Impact
Assessment (EIA) under the the Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017.
Schedule 1 and 2 of the Regulations set out the types of development
to which this applies. This can be discussed during pre-application
discussions and further information is provided at Section 3.7 
2.5 SCHEDULED MONUMENT CONSENT 
2.5.1 Any works directly affecting a designated Scheduled Monument
requires Scheduled Monument Consent (SMC) which is obtained from
Historic Environment Scotland. SMC is required for any works or
operations that would ‘ demolish, destroy, remove, repair, alter or add
to’ those parts of the FRE(AW)WHS designated a scheduled
monument. This includes invasive archaeological investigations.
Applications for SMC are made directly to Historic Environment
Scotland. 
2.5.2 Advice on the SMC process and requirements should be sought at an
early stage from the Heritage Directorate, Historic Environment
Scotland. As in the case of planning applications, early pre-application
contact, this time with Historic Environment Scotland, is strongly
advised. To streamline the process advice on applications for planning
permission and SMC should be sought at the same time. Where both
planning permission and SMC are required, development cannot
proceed without both consents in place. The annex to PAN 2/1011
provides a flowchart outlining the consideration of archaeology in
planning decisions and will be applicable to applications affecting the
Antonine Wall regardless of the need for SMC. 
Page 55

Page 56

2.5.3 The presumption of scheduling is that any future works will be the
minimum necessary consistent with the preservation of the monument.
The Historic Environment Scotland website and the HEPS includes
further information on scheduling and SMC and can be used to identify
the location of scheduled monuments: see Appendix 4. 
2.6 PERMITTED DEVELOPMENT & OTHER CONSENTS 
2.6.1 Development that does not require planning permission, for example
householder development within urban areas – where the Wall is
known to have survived under the modern-day ground surface – has
the potential to have adverse impacts without any assessment or
appropriate mitigation. Developers and property owners are strongly
urged to seek advice from the Council before undertaking any works
within the WHS or Buffer Zone to determine whether their proposal is
covered by permitted development rights and to discuss potential
impacts. 
2.6.2 SMC will still be required for permitted development that does fall
within the boundaries of the scheduled monument. 
2.6.3 It is the responsibility of the developer to ensure all necessary
consents, including Building Warrants, Conservation Area Consent and
Listed Building Consent, are obtained. 
KEY POINTS 
▪ Understand your development site: what are the potential impacts of
the proposal on the WHS and its setting? 
▪ Developers are expected to engage with the Council as early as
possible; 
▪ Unconnected to the need for planning permission, Scheduled
Monument Consent is required for works to any part of the
FRE(AW)WHS designated a scheduled monument.  
Page 56

Page 57

3.  Assessing the Impact of Development 
3.1 SECTION 3 INTRODUCTION 
3.1.1 This section of the SG provides information on the Council’s approach
to assessing the potential impacts of development on the Antonine
Wall WHS and its setting, including the criteria that will be used. 
3.1.2 Development must not compromise the Outstanding Universal Value
for which the Antonine Wall was inscribed as a WHS. The key
consideration in assessing the impact of development – as outlined in
the development plan – is the presumption against development which
would have an adverse impact on the Antonine Wall and its setting;
that is any impact that would damage the integrity, authenticity,
significance or understanding of the WHS. Examples of what could be
considered adverse include development that: 
▪ destroys or would lead to the damage of archaeological
remains;
▪ interrupts key views to, from, or within the WHS;
▪ changes the character of the landscape in and around the WHS;
▪ reduces people’s appreciation or understanding of the WHS in
its landscape setting;
▪ could negatively affect any of the qualities or significance for
which the WHS was inscribed. 
3.1.3 Impacts may be physical: upon the fabric of the monument; on the
setting of the wall: development that harms the character of the
landscape around the WHS; or cumulative: development that has the
potential to add to the existing negative effects of past or current
developments thereby creating further and possibly greater adverse
effects. This section considers each category of impact in turn and
other factors that will be considered in assessing the impact of
development. 
3.2 PHYSICAL IMPACTS 
3.2.1 Within the FRE(AW)WHS new development of any scale is likely to
have a physical effect on the fabric of the monument and could result in
loss of or damage to significant archaeological remains. Such impacts
intrinsically affect the integrity of the site – one of the reasons for which
it was inscribed as a WHS. Therefore any physical impact on the
surviving fabric of the WHS – whether upstanding or below ground, –
will be considered to be adverse. 
3.2.2 Where sections of the WHS have previously been developed the fabric
of the Antonine Wall may have already been compromised. In these
areas the key consideration in determining if a proposal would have an
adverse physical impact will be whether the new development will
result in additional loss or damage to archaeological remains. As an
Page 57

Page 58

initial guide, the current depth of development on a site sets a sub-
ground limit – known as the Vertical Buffer Zone – below which no
excavation should take place (see Figure 2). The vertical buffer zone
may include complex archaeological deposits, with features relating to
other periods of history, and site investigations to determine the vertical
buffer zone may themselves have adverse impacts. Carefully located
and designed proposals on previously developed sites that do not
extend below the vertical buffer zone may, therefore, be acceptable in
certain circumstances, provided they do not conflict with other planning
policies Pre-application advice should be sought to scope out potential
archaeological impacts of any proposal, particularly those impacts
which may extend beyond the WHS and its associated features. 
FIGURE 2: VERTICAL BUFFER ZONE 
3.2.3 Development should avoid areas of surviving archaeological remains. 
Avoiding the World Heritage Site and, in particular, areas which are
scheduled, will be the best approach.   Even in areas which have
already been developed, the presence, location, depth and sensitivity
of deposits cannot always be predicted.  In many instances it may be
appropriate to carry out an archaeological evaluation to help determine
where Roman deposits lie ahead of making a planning application. 
This may help to design proposals which avoid areas of archaeological
deposits. For smaller developments where surviving Roman deposits
are assessed as being improbable, an archaeological watching brief
and mitigation strategy may be more appropriate – this should be
discussed with the local authority and Historic Environment Scotland at
an early stage.  Moving development outwith the WHS will not
automatically avoid physical impact.  Although not covered by the
WHS, impacts upon archaeological deposits from other periods will not
always be acceptable and should also be considered as part of the
development planning process. 
3.2.4 Proposals should also consider potential long term impacts arising from
development, for example through compression and hydrological
impacts. 
Page 58

Page 59

3.2.5 To properly inform the design and assessment process (including pre
application discussions) it is essential that any new development site
overlying the boundaries of the WHS is, at the outset and at the
developer’s expense, the subject of a detailed archaeological
investigation undertaken by a suitably qualified professional. The
Chartered Institute for Archaeologist’ list of Registered Organisations a
good starting point for selecting a consultant. 
Physical Impact within the Buffer Zone 
3.2.6 There may be sub-surface archaeological deposits within or outwith the
defined buffer zone, outwith the line of the World Heritage Site, or
Scheduled areas. This is because the exact line of the Wall is not clear,
and new elements may be discovered during site works. Where known
archaeological remains are present, investigation will be required in
conjunction with new development. Where previously unknown
archaeological deposits are identified during site works the Council
should be informed immediately and further archaeological
investigations may be required. 
KEY POINTS 
▪ Any physical impact on the surviving fabric of the WHS - whether
upstanding or below ground -known or previously unrecognised - will
not be permitted. This refers to both Scheduled Monument and
unscheduled sections of the WHS. 
▪ Proposals on previously developed sites that do not extend below the
vertical buffer zone may be acceptable in certain circumstances. 
▪ Detailed archaeological investigations will be required to accompany
any proposals for development within the boundaries of the WHS. 
▪ Where the extent or presence of archaeological remains is unclear,
pre-determination evaluation will be required. 
3.3 IMPACTS ON SETTING 
3.3.1 The Antonine Wall was not constructed in isolation. It was deliberately
positioned with reference to the surrounding topography, resources and
landscape of central Scotland, notably the southern edge of the valley
formed by the Rivers Kelvin and Carron – a position that offered the
Wall wide-ranging views over the Kilsyth Hills, the Campsie Fells, and
Kilpatrick Hills and meant that it too was widely visible in the landscape.
The setting of the FRE(AW)WHS is predominately well preserved and
readily perceptible and it is this relationship with the landscape that is a
fundamental part of what makes the WHS so significant and
contributes to how it is experienced, understood and appreciated: its
outstanding universal value which must be protected.
Page 59

Page 60

3.3.2 The Buffer Zone has been defined to ensure that all proposals for
development within it are considered carefully as they may have the
potential to affect the WHS; the adjacent environment that it is part of,
and which contributes to the character, significance and
understanding of the Wall. The capacity for new development in the
Buffer Zone varies significantly along the length of the WHS and while
the Council does not seek to prevent all change to the landscape
within the Buffer Zone, it is considered essential that new
development is effectively accommodated within the landscape and is
designed and located to conserve and enhance the setting of the
WHS. This also applies to developments out with the Buffer Zone that
may have an impact by virtue of their scale or visual relationship with
the Antonine Wall. 
Development in the Buffer Zone 
3.3.3 Antonine Wall Policy 2 presumes against development within the
buffer zone which would have an adverse impact on the WHS and its
setting, unless mitigating action to the satisfaction of the Council in
consultation with Historic Environment Scotland can be taken to
redress the adverse impact. Section 4 covers potential mitigation
action, however, it should be noted that in many instances it will not
be possible to mitigate the adverse impact of a proposed
development upon the AW(FRE)WHS. Adverse impacts will be
defined as those which could affect the following criteria: 
▪ a) The authenticity and integrity of the setting, e.g.: 
- Changes to the prominence/dominance of the WHS in the
landscape;
- Obstruction of views to and from the WHS;
- Changes in the overall preservation of the landscape setting. 
▪ b) The significance of the setting, e.g.: 
- How the function and meaning of the WHS relates to the
landscape;
- How the WHS is understood and can be appreciated in the
landscape;
- Relationships between components of the WHS and related
sites. 
▪ c) The character of the landscape in which the WHS sits, including
the contribution the WHS makes to wider landscape character. 
▪ d) The quality of the wider landscape. 
3.3.4 Additional information on the Buffer Zone; how it was defined and its
key characteristics can be found in the Nomination Document and the
Page 60

Page 61

report ‘Definitions of Buffer Zones to the World Heritage Site’. Historic
Environment Scotland has also produced advice on Managing
Change in the Historic Environment (see Appendix 4). These
documents will be a material consideration in the determination of
proposals and their possible impacts. 
Development affecting the wider landscape setting of the World
Heritage Site 
3.3.5 In addition to the defined Buffer Zone it may be necessary to consider
potential impacts of new development outside the Buffer Zone on
longer distance views to and from significant landscape features –
notably the upland edge of the Campsie Fells and Kilpatrick Hills –
which play an important part in the appreciation and significance of
the WHS. Most development beyond the Buffer Zone will not have an
adverse effect on the setting of the WHS or its setting, however, major
development in particular has the potential to detract from or damage
longer distance views to and from the Site. The criteria for judging
whether impacts on wider setting can be considered ‘adverse’ are
broadly the same as those outlined above. 
3.3.6 Within built up areas, parts of the WHS, particularly the scheduled
monument, may also have a setting which will require to be
determined on a site by site basis. 
KEY POINTS 
▪ There will be a presumption against development within the Buffer
Zone which would have an adverse impact on the WHS and its
setting. 
▪ The Criteria set out in paragraph 3.5.3 will be applied in the
assessment of what is an adverse impact on the setting of the
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site. 
3.4 CUMULATIVE IMPACTS 
3.4.1 New development will be assessed on its own merits. However, there
are potential instances where development impacts, acceptable in
isolation, combine to create adverse cumulative impacts on the WHS.
These may be physical – where a series of developments have
resulted in significant losses of archaeological material, or affect the
setting of the WHS – where a sequence of new developments erodes
visual connections with the landscape. Councils will therefore
consider the potential for new development to create, add to or set a
precedent for adverse cumulative impacts. Such consideration will
include:- 
Page 61

Page 62

▪ What developments or types of development, in the vicinity of the
proposed site have adversely affected the integrity of the WHS in
the past?
▪ What ongoing activities, developments or natural processes are
affecting its physical condition and survival, and the integrity of its
setting?
▪ What other developments are proposed in the short- to medium-
term that are likely to contribute to adverse effects on the WHS?
▪ Whether the impact of the proposed development is likely to
contribute to cumulative effects generated by the above? 
KEY POINT 
▪ The Council may advise developers to demonstrate they have
given due consideration to the cumulative impact of their
development on the Antonine Wall and its setting. 
3.5   ADDING VALUE 
3.5.1 Where development would not have an adverse impact on the
Antonine Wall and its setting, proposals should seek to make a
positive contribution to the conservation, management and
understanding of the WHS and its setting. Sympathetic, high-quality
design of development can have the potential to add value by
enhancing the character of the WHS and its setting; promoting
improved access, (including by public transport), to, and
interpretation of the site; and contributing to a wider appreciation and
understanding of the WHS in its landscape context. Opportunities
should be identified early in the planning process. Pre-application
discussions with the Council and the archaeology service will assist
in drawing out suitable ideas which can be implemented through the
development process. 
3.6 OTHER PLANNING POLICIES & ASSESSMENTS 
3.6.1 In addition to the impact of proposed development upon the WHS
and its setting, applications for planning permission will also be
considered against relevant policies in the Council’s development
plan, other supplementary guidance and the national policy
framework. Details can be viewed online or can be seen, and
discussed, at the appropriate Council offices. 
3.7 ENVIRONMENTAL IMPACT ASSESSMENT 
3.7.1 Schedules 1 and 2 of the Town and Country Planning (EIA)
(Scotland) Regulations 2017 set out the types of development likely
to have significant impacts on the environment and which are
required to undergo Environmental Impact Assessment. Both
scheduled monuments and World Heritage Sites are defined as
‘sensitive areas’ under the Regulations. Where any proposed
Page 62

Page 63

Schedule 2 development falls within a scheduled monuments or
WHS and is likely to have ‘significant environmental effects,’ an
Environmental Impact Assessment is required (Schedule 1
development always requires EIA). This includes any type of
development that would ordinarily have permitted development
rights, but is located within the sensitive area/is above the thresholds
set out in the Regulations. 
https://www.legislation.gov.uk/ssi/2017/102/contents/made 
3.7.2 EIA development that falls within the Scheduled Area will also
require Scheduled Monument Consent. Planning Circular 1/2017
provides further information on the EIA Regulations. 
http://www.gov.scot/Publications/2017/05/6292  
Page 63

Page 64

4.  Design and Mitigating Impacts 
4.1 SECTION 4 INTRODUCTION 
The purpose of this section is to outline the general design principles
for new development within the WHS and Buffer Zone. 
4.1.1 A core principle of the modernised planning system is the focus on the
quality of outcomes, taking account of the sustainable use of land,
good design and the protection and enhancement of the built and
natural environment. The international significance of the Antonine Wall
means good quality design will be vital for any development on or near
the WHS, including within the Buffer Zone and fundamental to the
avoidance of any adverse impact. 
4.2 DESIGN CRITERIA 
4.2.1 In the first instance, there is a presumption against development which
would have an adverse impact on the Frontiers of the Roman Empire
(Antonine Wall) World Heritage Site and its setting. Key to the
avoidance and minimisation of adverse impacts on the WHS will be
good design which takes account of the following principles: 
▪ Careful site selection:
▪ Site selection should avoid the WHS, in particular those
areas which are scheduled; 
▪ Site selection within the Buffer Zone should  avoid the
most sensitive areas and avoid obstructing views to/from,
and limiting existing access to the WHS; 
▪ Prioritise previously developed sites, taking account of
the ‘vertical buffer zone’ and allowing, where possible,
development to fit within existing settlement patterns. 
▪ Well considered development layout:
▪ Proposed development should seek to maximise the
benefit of existing site features, especially topography
and vegetation, to eliminate adverse visual impacts. 
▪ Appropriate building design:
▪ The characteristics of the site, landscape and local
building styles should inform the form, massing, height
and materials of new buildings, generating coherent, high
quality solutions. 
▪ High quality landscape design:
▪ Landscaping – both hard and soft – should be as much
part of the development process as the architecture. Well
planned and executed design may enable development
to be accommodated by the site and wider landscape and
Page 64

Page 65

has the potential to reinforce existing landscape features
and character. Additional landscaping can also impact on
intervisibility between different parts of the WHS and its
setting. It is therefore important that the location and
specification of new landscaping is considered in relation
to impact on the WHS and its setting. 
4.3 MITIGATION 
4.3.1 Antonine Wall Policy 2 states there will be a presumption against
development within the Buffer Zone which would have an adverse
impact on the Site and its setting unless mitigating action to the
satisfaction of the Council, in consultation with Historic Environment
Scotland, can be taken to redress the adverse impact. Mitigation
measures potentially reduce any identified impacts to an acceptable
level. It is emphasised though that not all adverse impacts can be
successfully mitigated. Impacts on the WHS and its setting should
primarily be avoided through positive siting and design decisions in
preference to the use of other mitigation measures. 
4.3.2 Examples of mitigation may include landscaping proposals which are
designed to reflect and strengthen local landscape character and the
visual setting of the Antonine Wall. Mitigation measures however
should not in themselves potentially generate adverse impacts. 
4.3.3 Design matters and the potential for mitigation measures should be
discussed at the pre-application stage, and appropriate reports
submitted in support of any application demonstrating that discussions
have been effectively incorporated in the finalised proposals. In the
event that permission is granted suitable conditions and, if necessary,
planning agreements will ensure the proper implementation of agreed
mitigation measures. 
4.3.4 Conditions will be used to ensure that development does not proceed 
before a programme for appropriate mitigation has been identified,  or
where archaeological recording has taken place. Conditions will ensure
that safeguards are in place to protect important features. When
imposing conditions, planning officers will consult with Historic
Environment Scotland and/or Council’s Archaeologists to ensure that
the proposed measures are proportionate, enforceable and effective in
conserving OUV. Examples of suitable conditions might include
landscaping and/or protective buffer zones around key in-situ sections
of the wall 
KEY POINTS 
All development within the Frontiers of the Roman Empire (Antonine
Wall) World Heritage Site and Buffer Zone will be expected to be of
good design, demonstrating: careful site selection; well considered
Page 65

Page 66

development layout; appropriate building design and materials; high
quality landscape design. 
▪ Mitigating action which redresses the adverse impact of development
within the Buffer Zone may be acceptable but must be discussed in
consultation with – and be to the satisfaction of - the Council and
Historic Environment Scotland. 
▪ Mitigation of adverse impacts will not be possible in all instances. 
4.4 ENFORCEMENT 
4.4.1 The unique trans-national nature of the Frontiers of the Roman Empire
(Antonine Wall) World Heritage Site means that damage to the
Antonine Wall could affect the integrity and significance of the WHS as
a whole – with international implications for Scotland. 
4.4.2 The recognition of the WHS’s Outstanding Universal Value, means the
Antonine Wall requires the highest level of statutory protection. Loss or
damage to upstanding archaeological remains and those buried
beneath the ground will be treated as a particularly serious breach of
regulatory controls. Other impacts of unauthorised development will be
judged against the same guidance for new developments with respect
to the effect on the character, integrity or significance of the World
Heritage Site. Non-compliance with planning conditions or agreements
may also result in significant adverse impacts. 
4.4.3 Breaches of planning control will be investigated and, if appropriate,
enforced by the Council, or in consultation with Historic Environment
Scotland. In all cases it will be required that ongoing work cease with
immediate effect, to allow a proper assessment of the impacts and
prevent damage or loss once it is established that there is or has been
a breach. In particular it may be considered appropriate to issue a
temporary stop notice requiring an immediate halt to activity and
allowing time for further enforcement action to be put in place to protect
the site or archaeological remains. Full details of the enforcement
powers available to planning authorities are set out in Planning Circular
10/2009: Planning Enforcement. Remedying the breach will take
account of particular circumstances, but can include full site
reinstatement. Non-compliance with enforcement or stop notices can
also be prosecuted at the Sherriff Court. 
4.4.4 Any person carrying out unauthorised works or allowing unauthorised
works to be carried out on a Scheduled Monument without consent are
guilty of an offence. Works are defined as: anything resulting in the
demolition or destruction of a scheduled monument; any works for the
purpose of removing or repairing a scheduled monument; or any
flooding or tipping operations. The Historic Environment
(Amendment)(Scotland) act 2014 introduced new powers to enable
Scottish Ministers to serve scheduled monument enforcement notices,
Page 66

Page 67

complemented by temporary stop notices where unauthorised works
are taking place on a scheduled monument. Further information on this
is available on Historic Environment Scotland's website 
https://www.historicenvironment.scot/advice-and-support/applying-for-
consents/scheduled-monument-consent/compliance/ 
KEY POINTS 
▪ The Council will seek to protect the Outstanding Universal Value of the
World Heritage Site through a robust approach to unauthorised
development. The Statement of Outstanding Universal Value is located
here: http://www.antoninewall.org/world-heritage/nomination-and-
inscription/souv 
▪ ICOMOS have prepared guidance on the process of commissioning
HERITAGE IMPACT ASSESSMENTS (HIAs)  for World Heritage (WH)
properties in order to evaluate effectively the impact of potential
development on the Outstanding Universal Value (OUV) of properties.
This is located here : http://www.icomos-uk.org/world-heritage/  
Page 67

Page 68

APPENDIX 1: STATEMENT OF OUTSTANDING UNIVERSAL VALUES 
The Statement of Outstanding Universal Value for the Frontiers of the Roman
Empire (Antonine Wall) World Heritage Site as contained in the decision
notice of the World
Heritage Committee outlines the exceptional cultural significance of the
Antonine Wall: 
“The Antonine Wall fully illustrates the effort of building the Limes on the
frontiers of the Roman Empire, at the time of its apogee and greatest
extension in the British Isles and worldwide (middle of the 2nd century AD). It
embodies a high degree of expertise in the technical mastery of earthen
defensive constructions, in the construction of a strategic system of forts and
camps, and in the general military organisation of the Limes. The Antonine
Wall also demonstrates the diffusion of the military and civil engineering of the
Roman civilisation to the whole of Europe and the Mediterranean world.” 
The Antonine Wall meets three of the selection criteria for inscription as a
World Heritage Site, (ii), (iii) and (iv): 
(ii) The Antonine Wall is one of the significant elements of the Roman Limes
present in Europe, The Middle East and North Africa. It exhibits important
interchanges of human and cultural values at the time of the apogee of the
Roman Empire; 
(iii) The Antonine Wall bears testimony to the maximum extension of the
Roman Empire, by the consolidation of its frontiers in the north of the British
Isles, in the middle of the 2nd Century AD. The property illustrates the Roman
Empire’s ambition to dominate the world in order to establish its law and way
of life there in a long-term perspective; 
(iv) The Antonine Wall is an outstanding example of the technological
development of Roman military architecture and frontier defence  
Page 68

Page 69

APPENDIX 2: KEY POINTS 
• The Antonine Wall is of international significance. As a World Heritage
Site (WHS) its outstanding universal value, authenticity and integrity
must be protected.
• There is a presumption against development which would have an
adverse impact on the Antonine Wall and its setting.
• Developers are expected to engage with the Council as early as
possible.
• Any physical impact on the surviving fabric of the WHS – whether
upstanding or below ground, known or previously unrecognised – will
only be permitted in exceptional circumstances ;
• All development within the WHS and Buffer Zone will be expected to be
of good design, demonstrating: careful site selection; well considered
development layout; sympathetic, high-quality building and landscape
design and materials.
• Mitigating action which redresses the adverse impact of development
within the Buffer Zone may be acceptable but must be discussed in
consultation with – and be to the satisfaction of – the Council and
Historic Environment Scotland.
• The Council and Historic Environment Scotland will seek to protect the
Outstanding Universal Value of the WHS through a robust approach to
unauthorised development.  
Page 69

Page 70

APPENDIX 3: GLOSSARY 
Antonine Wall
The Roman Empire frontier system running across central Scotland from the
Firth of Forth to the Clyde Estuary, constructed c AD 142 on the orders of the
Emperor Antoninus Pius. Inscribed as part of the Frontiers of the Roman
Empire World Heritage Site in July 2008. 
Authenticity
Depending on the type of cultural heritage, and its cultural context, properties
may be understood to meet the conditions of authenticity if their cultural
values (as recognised in the nomination criteria proposed) are truthfully and
credibly expressed through a variety of attributes including: form and design;
materials and substance; use and function; traditions, techniques and
management systems; location and setting; language, and other forms of
intangible heritage; spirit and feeling; and other internal and external factors. 
Buffer Zone
For the purposes of effective protection of the nominated property, a buffer
zone is an area
surrounding the nominated property which has complementary legal and/or
customary restrictions placed on its use and development to give an added
layer of protection to the property. This should include the immediate setting
of the nominated property,
important views and other areas or attributes that are functionally important as
a support to the property and its protection. The area constituting the buffer
zone should be determined in each case through appropriate mechanisms. 
Environmental Impact Assessment (EIA): Environmental Impact
Assessment (EIA) is the process of assessing the likely environmental
impacts of a proposal and identifying options to minimise environmental
damage. 
Frontiers of the Roman Empire: World Heritage Site composed of three
walls in different parts of Europe- Antonine Wall, Hadrian’s Wall, German
Limes forming part of the frontiers of the Roman Empire. 
The Historic Environment Policy for Scotland: sets out how Historic
Environment Scotland fulfils its regulatory and advisory roles and how it
expects others to interpret and implement Scottish Planning Policy. It is a
material consideration in the Scottish planning system. 
Integrity
Integrity is a measure of the wholeness and intactness of the natural and/or
cultural heritage and its attributes. Examining the conditions of integrity,
therefore requires assessing the extent to which the property: includes all
elements necessary to express its Outstanding Universal Value; is of
adequate size to ensure the complete representation of the features and
processes which convey the property’s significance; suffers from adverse
effects of development and/or neglect.
Page 70

Page 71

Scheduled Monument: A nationally significant monument, building or site
included in the Schedule of Monuments maintained by Historic Environment
Scotland. 
Setting:  the way the surroundings of a historic asset or place contribute to
how it is understood, appreciated and experienced. 
World Heritage Site: World Heritage Sites are cultural and/or natural sites
considered to be of ‘Outstanding Universal Value’, which have been inscribed
on the World Heritage List by the World Heritage Committee. 
Outstanding Universal Value: Outstanding Universal Value means cultural
and/or natural significance which is so exceptional as to transcend national
boundaries and to be of common importance for present and future
generations of all humanity. As such, the permanent protection of this heritage
is of the highest importance to the international community as a whole. At the
time of inscription of a property on the World Heritage List, the World Heritage
Committee adopts a Statement of Outstanding Universal Value which will be
the key reference for the future effective protection and management of the
property.  
Page 71

Page 72

APPENDIX 4: GENERAL INFORMATION AND CONTACTS 
Antonine Wall World Heritage Site website: 
http://www.antoninewall.org/ 
Antonine Wall Management Plan:
https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationId=f477ec1e-8366-4295-ac10-
a5c900aab488 
Antonine Wall nomination document
http://www.antoninewall.org/sites/default/files/Antonine%20Wall%20Nominatio
n%20doc.pdf 
Historic Environment Scotland: 
www.historicenvironment.scot 
Data Services:
https://portal.historicenvironment.scot/spatialdownloads 
Scheduled monuments:
https://www.historicenvironment.scot/advice-and-support/listing-scheduling-
and-designations/scheduled-monuments/ 
Chartered Institute for Archaeologists (CIfA):
http://www.archaeologists.net/ 
Historic Environment Scotland) Act 2014
http://www.legislation.gov.uk/asp/2011/3/pdfs/asp_20110003_en.pdf 
Planning Advice Note (PAN) 2/2011: Planning and Archaeology
http://www.gov.scot/Publications/2011/08/04132003/0 
Definitions of Buffer Zones to the World Heritage Site (Land Use Consultants
report for Historic Environment Scotland, July 2006) – available on request 
Managing Change in the Historic Environment (Historic Environment
Scotland) World Heritage Sites: 
https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationid=89d391d9-9be2-4267-919f-
a678009ab9df 
Managing Change in the Historic Environment (Historic Environment
Scotland)
Setting: https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationId=80b7c0a0-584b-4625-b1fd-
a60b009c2549 
Scheduled Monument Consent:
https://www.historicenvironment.scot/archives-and-
Page 72

Page 73

research/publications/publication/?publicationId=515c06f2-d8b0-40f9-919f-
a88000d44a5b 
LOCAL DEVELOPMENT PLANS 
Falkirk Local Development Plan 2:
https://www.falkirk.gov.uk/services/planning-building/planning-policy/ 
North Lanarkshire Local Development Plan:
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-
plans/local-development-plan 
East Dunbartonshire Local Development Plan 2:
https://www.eastdunbarton.gov.uk/residents/planning-and-building-
standards/planning-policy
Glasgow City Development Plan
https://www.glasgow.gov.uk/index.aspx?articleid=16184 
West Dunbartonshire Local Development Plan:
https://www.west-dunbarton.gov.uk/council/strategies-plans-and-
policies/local-development-planning/ 
CONTACTS 
East Dunbartonshire Council
Development Applications Team, Southbank House, 1 Strathkelvin Place
Kirkintilloch, G66 1XQ
Tel: 0300 123 4510
Email: planning@eastdunbarton.gov.uk 
Falkirk Council
Planning & Environment, Development Services, Abbotsford House, David’s
Loan, Falkirk, FK2 7YZ
Tel: 01324 504950
Email: planenv@falkirk.gov.uk 
Glasgow City Council
Development and Regeneration Services, 229 George Street, Glasgow, G1
1QU
Tel: 0141 287 8555 
Email: developmentplan@glasgow.gov.uk 
North Lanarkshire Council
Development Management, Planning and Development, Fleming House, 2
Tryst Road, Cumbernauld, G67 1JW
Tel: 01236 632500
Email: ESEnquiries@northlan.gov.uk 
West Dunbartonshire Council
Development Management Section, 16 Church Street, Clydebank, G81 1TG
Page 73

Page 74

Tel: 01389 738575
Email: buildingandplanning@west-dunbarton.gov.uk 
Historic Environment Scotland - Planning, Consents & Advice Service,
Longmore House, Salisbury Place, Edinburgh, EH9 1SH.
Tel: 0131 668 8716
Email:  HMconsultations@hes.scot 
Page 74

Page 75

APPENDIX 5: MAP OF ANTONINE WALL AND COUNCIL AREAS
Page 75

Page 76

APPENDIX 6: THE ANTONINE WALL THEN AND NOW 
Page 76

Page 77

ITEM 7 Appendix 2
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site – comments received on draft version and Council’s
proposed response
Respondent Comment WDC response
Historic Environment Scotland
The comments submitted by HES
reflect comments already
submitted when the Antonine
Wall Supplementary Guidance
was consulted on by other
partner authorities. As the
document had been reformatted
for publication by West
Dunbartonshire Council, the
section references in the HES
response do not reflect the
paragraph numbers in the WDC
version. Most of the changes
requested had already been
made in the version published by
WDC
The comments in the attached annex reflect
comments that we have already given in
response to consultation on the draft
Supplementary Guidance from other partner
authorities (e.g. East Dunbartonshire). We have
also included some notes where the wording of
the document should be altered to use
appropriate and up to date terminology.
Annex
Section 1.6 
The wording could be improved in this
paragraph. It suggests initially that the Wall only
survives where it is visible above ground.
Potential alternative wording: ‘Today, around one
third of the Antonine Wall is visible above ground,
at places such as... open spaces within urban
areas and, though not visible above ground,
survives below ground’ 
Section 1.8 
The last sentence needs amended from should
read ‘not only identifies the reasons for the Wall’s
inscription as a World Heritage Site, but provides
the basis for its effective protection and
management. 
The HES comments mostly relate to an
earlier version of the SG, published by
other partner authorities, and have
largely already been incorporated into the
version of the document published by the
Council. As a result, the section
references used by HES do not always
match up with the current version. Any
outstanding changes are considered
below.
Accepted, change made at section 1.3.4.
Changes already incorporated at
paragraph 1.4.2.
Page 77

Page 78

Section 1.9 
The end of this sentence should read
‘authenticity and integrity’. 
Section 1.10
The revised wording here no longer specifically
refers to the protection of the World Heritage
Site. This revised wording may imply a
weakening of the protections for the WHS. If the
original wording has not caused problems it
would be better to revert to the original wording
here. 
Section 1.11 
A page number for boundaries of the WHS and
Buffer Zone (singular) will need to be inserted
here. Furthermore, the list of relevant local
plans/local development plans is listed in
Appendix 4 not 3. 
Section 1.12 
This section incorrectly refers to Historic
Environment Scotland Policy (HESP). This
should be amended to the Historic Environment
Policy for Scotland (HEPS). As we noted in the
earlier, SPP will be replaced by the policies
within the Fourth National Planning Framework
(NPF4) in the relatively near future it may be
worth considering how this change can be
accommodated both for this note and for the
others. 
Changes already incorporated at
paragraph 1.4.3. 
Changes already incorporated at
paragraph 1.5.1. 
Changes already incorporated at
paragraph 1.5.2. 
Changes already incorporated at
paragraph 1.6.2.
The document needs to reflect the policy
documents in place at the time of
preparation so reference to the draft
Fourth National Planning Framework is
not appropriate. 
Page 78

Page 79

Section 1.14 
The first sentence of this section refers the ‘the
following specific planning policies’ whereas the
policies are presented on the page before this. 
Key Points (Page 5) As a point of detail, the
second bullet point has a typographic error (hich
instead of which). 
Site Audit (Page 6) The list of key questions for
Site Characteristics and Setting should include
'will the proposal have a direct impact on the
remains of the Antonine Wall and associated
archaeological features?' 
Section 2.9 
The last sentence of this section states that
‘further information is provided at Section 3.8.2’.
As there is no Section 3.8.2 it may be that the
appropriate reference is Section 3.19 and 3.20. 
Section 2.12 
As with Section 1.12 the correct reference here is
HEPS not HESP. 
Section 3.2 
The last line of the first paragraph of this section
should read ‘Examples of what could be
considered adverse include development that:’
The second of the following bullet points should
read ‘interrupts views to, from, or within’. 
Accepted, minor revision made at
paragraph 1.6.4. 
Changes already incorporated in Key
Points below paragraph 1.6.5. 
Changes already incorporated in Table 1. 
Noted – section reference has been
corrected in paragraph 2.4.1 
Changes already incorporated at
paragraph 2.5.3. 
Changes already incorporated at
paragraph 3.1.2. 
Page 79

Page 80

Section 3.5 
The fourth sentence of this section should read
‘The vertical buffer zone may include complex
archaeological deposits, with features...' 
Section 3.6 
The below text would be more appropriate
terminology to use in this section. 'should avoid
areas of surviving archaeological remains.'
'Avoiding the World Heritage Site and, in
particular areas which are scheduled will be the
best approach' '... the presence, location, depth
and sensitivity of deposits cannot...' 'This may
help to design proposals that avoid...' '...impacts
upon archaeological deposits from other
periods...' 
Section 3.8 
The first sentence of this section should read
‘any new development site overlying the
boundaries of the WHS’. 
Section 3.9 
This section is not clear on what happens if
new/unknown elements are discovered during
site works. We would therefore offer the following
revisions to address this ambiguity. 
• Revise first sentence to read: 'There may
be sub-surface archaeological deposits...' 
Changes already incorporated at
paragraph 3.2.2. 
Changes already incorporated at
paragraph 3.2.3. 
Changes already incorporated at
paragraph 3.2.5. 
Changes already incorporated at
paragraph 3.2.6. 
Page 80

Page 81

• • Potential Alternative wording - '...Where
known archaeological remains are present,
investigation will be required in conjunction with
new development. Where previously unknown
archaeological deposits are identified during site
works the Council should be informed
immediately and further archaeological
investigations may be required' 
Section 3.10 
The quote marks around setting should be
removed as they are unnecessary, potentially
confusing for readers and have been used
elsewhere in the guidance. 
Section 3.11 
The second sentence of this section should read
‘does not seek to prevent all change’. 
Key Points (Page 10) The first bullet point does
not make it clear whether this is referring to
scheduled sections of the WHS or unscheduled
ones although the text is similar to the scheduled
monument policy in SPP. The current wording
would allow for impacts in exceptional
circumstances which doesn't reflect policy
wording for the WHS in the Proposed LDP or
SPP which presumes against development with
an adverse impact. Also suggests a potential
weakening of protections. It is  recommended
that this is changed back to previous wording or
otherwise clarified. Furthermore, it would be 
Changes already incorporated 
Accepted- wording will be revised at
paragraph 3.3.2. 
Changes already incorporated at
paragraph 3.2.6. 
Page 81

Page 82

useful to include a further key point that where
the extent or presence of archaeological remains
is unclear, pre-determination evaluation will be
required 
Section 3.12 
The last two bullet points in this section are not
examples of significance of setting but separate
points. This may be a result of reformatting of the
original guidance which separated these out. It is
recommended that the formatting is adjusted to
make this clear. 
Section 3.16 
As a point of detail, the second bullet point of this
section should read ‘and the integrity of its
setting’. 
Section 3.19 
The link provided here for the EIA regulations is
still to the 2011 regulations rather than the 2017
regulations and should be updated. The updated
link would be The Town and Country Planning
(Environmental Impact Assessment) (Scotland)
Regulations 2017 (legislation.gov.uk). 
Section 4.3 
Bullet point 1 of this section should read 'Site
selection should avoid the WHS...'. Similarly,
bullet point 2 should read ‘Site selection with the
Buffer Zone should avoid the most sensitive
areas and avoid obstructing views. 
Changes already incorporated at
paragraph 3.3.3. 
Changes already incorporated at
paragraph 3.4.1. 
Changes already incorporated at
paragraph 3.7.2 
Changes already incorporated at
paragraph 4.2.1 
Page 82

Page 83

Section 4.3 (High Quality Landscape Design) 
The last sentence of this section should read ‘It is
therefore important that the location and
specification of new landscaping is considered in
relation to impact on the WHS and its setting’. 
Section 4.4 
The reference to the Buffer Zone in the first
sentence of this section should be singular. 
Section 4.7 
The final sentence of this section should read
‘Examples of suitable conditions might include
landscaping and/or protective buffer zones
around key in-situ sections of the wall. 
Section 4.9 
The second sentence of this section should read
‘Loss or damage to upstanding archaeological
remains and…’ 
Section 4.10 
As a point of detail these is a space missing in
the first sentence between or and in. The second
sentence should read ‘In all cases it will be
required that ongoing…’. 
Section 4.8 
(This follows 4.10 and should be amended to
4.11) 
Changes mostly already incorporated at
paragraph 4.2.1; minor correction to
wording made. 
Changes already incorporated at
paragraph 4.3.1 
Changes already incorporated at
paragraph 4.3.4. 
Changes already incorporated at
paragrpah 4.4.2. 
Changes already incorporated at
paragraph 4.4.3. 
Changes already incorporated at
paragraph 4.4.4. 
Page 83

Page 84

If useful a link to HES web pages on enforcement
could be added here:
https://www.historicenvironment.scot/advice-and-
support/applying-for-consents/scheduled-
monument-consent/compliance/ 
Appendix 4: General Information,
Development Plans and Useful Contacts 
It is welcomed the contact information here for
Historic Environment Scotland. However,
Heritage Management has now been changed to
the Planning, Consents and Advice Service. It
would be beneficial to update this contact
information. 
Noted; minor revision to wording made. 
NatureScot Broadly support the content of this Guidance
which consider provides clear, useful information
for those involved in development proposals
affecting the wall and its setting.
It is noted that landscape effects are one of the
criteria for the acceptability of development in the
context of the Antonine Wall. While consideration
of these effects is focused on the World Heritage
Site and the protection and setting of the site, we
note that the design criteria of reinforcing existing
landscape features and character is likely to lead
to outcomes that are generally positive.
Comments are noted. No changes to the
document are considered necessary.
The Coal Authority Our records indicate that within the West
Dunbartonshire area there are recorded coal
mining features present at surface and shallow
depth including; mine entries, shallow coal
workings and reported surface hazards.  These
Comments are noted. No changes to the
document are considered necessary.
Page 84

Page 85

features may pose a potential risk to surface
stability and public safety.   
The Coal Authority’s records indicate that surface
coal resource is present in the area, although this
should not be taken to imply that mineral
extraction would be economically viable,
technically feasible or environmentally
acceptable. As you will be aware those authorities
with responsibility for minerals planning and
safeguarding will have identified where they
consider minerals of national importance are
present in your area and related policy
considerations.  As part of the planning process
consideration should be given to such advice in
respect of the indicated surface coal resource. 
It is noted however that this current consultation
relates to Supplementary Guidance on the
Frontiers of the Roman Empire (Antonine Wall)
World Heritage Site.  The Planning team at the
Coal Authority have no specific comments to
make on this guidance document.   
Page 85

Page 86

ITEM 7 - Appendix 3
Local Development Plan 2
Creating Places
Supplementary Guidance
November 2022
Page 86

Page 87

Status of this document
This document has been prepared as Supplementary
Guidance to the Local Development Plan (LDP2). It is a
material consideration in planning decisions, and will be
adopted as part of the development plan following the
adoption of LDP2.This document is also available in other
languages, large print and audio format on request.
Please contact Corporate Communications at:
Address: West Dunbartonshire Council, Council Offices, 16
Church Street Dumbarton, G82 1QL 
Phone: 01389 737527 
Email: Communications@west-dunbarton.gov.uk
Arabic
Hindi
Punjabi
Urdu
Chinese (Cantonese)
Polish
British Sign Language
BSL users can contact us via ContactScotland-BSL, the on-
line British Sign Language interpreting service. 
Find out more on the ContactScotland website .
Page 87

Page 88

Contents
Introduction ...................................... 2
Vision ............................................. 2
A Proud Past................................ 2
A Promising Future ...................... 3
Status of this guidance ................ 4
Using this Guidance ..................... 4
Policy Context ............................... 5
National Policy ............................. 5
National Guidance ....................... 5
Development Plan ....................... 5
Successful Placemaking Process... 6
Design Team ............................... 6
Collaboration................................ 6
Planning Applications .................. 8
Policy CP3 Masterplanning and
Development Briefs ..................... 9
Policy CP4 Place and Design
Panel ......................................... 10
Design Considerations .................. 11
Character and Identity ................ 11
Setting ....................................... 11
Character ................................... 13
Connections ............................... 14
Street Design ............................... 15
Pedestrians ................................ 15
Cyclists....................................... 16
Vehicles ..................................... 16
Parking ....................................... 17
Materials .................................... 18
Green Infrastructure.................... 19
Water Management ................... 19
Habitat Enhancement ................ 21
Access Networks ....................... 22
Open Space ............................... 23
Layout and Form ......................... 24
Urban Structure .......................... 24
Streets, Blocks & Plots ............... 25
Density & Mix ............................. 26
Height & Massing ....................... 27
Buildings and Materials .............. 28
Buildings .................................... 28
Materials .................................... 29
Sustainable Design ..................... 30
Sustainable Construction ........... 30
Low Carbon Technology ............ 31
Accessibility ............................... 32
Appendices .................................. 33
Glossary ..................................... 33
Useful Contacts .......................... 38
Contact Us ................................. 38
Page 88

Page 89

2
Introduction
“Creating places is about giving
our communities an identity and
making West Dunbartonshire a
place where people want to visit
and live. It is about integrating
and thinking about how houses,
communities, open spaces,
schools, other community
facilities, town centres, industrial
areas and the countryside come
together to create places that
people are proud to call their
home.”
West Dunbartonshire
Local Development Plan 2
Vision
A Proud Past
The Clyde and the Leven have shaped
the landscape of West Dunbartonshire
and have been the setting for the
area’s earliest settlement and industrial
growth. West Dunbartonshire is
characterised by towns and villages
nestled between these rivers and the
Kilpatrick Hills, or the Muirs, to the
west of the Leven Valley. While each
of the area’s towns and villages has its
own unique character and history, this
shared geography and landscape ties
them together. The waterfront outlook;
great access to recreation in the
rugged moorland Kilpatrick Hills; and
location, between Glasgow and the
Loch Lomond and Trossachs National
Park provide unique assets to be
enjoyed by residents of West
Dunbartonshire. 
This riverside setting has contributed to
some of the key historical
developments in West Dunbartonshire,
of which evidence can still be seen in
the landscape. Old Kilpatrick, was
once a staging point on the Antonine
Wall, a Frontier of the Roman Empire.
Part of the wall can still be seen at
Goldenhill Park, Clydebank where the
outline of a Roman Fort is visible. The
strategic location of Dumbarton Castle,
allowed it to be the seat of the
Kingdom of Strathclyde, as part of
1500 years of history of fortification at
Dumbarton Rock. While the Castle
continues to be a heritage asset and
visitor attraction, the Rock itself
continues to attract each generation’s
best rock climbers to its challenging
walls. The Forth and Clyde Canal,
which starts at Bowling Basin, tracked
a parallel course to the Antonine Wall,
linking the River Clyde inland to
Clydebank, Glasgow, Edinburgh and
the Forth. This former working
waterway has taken on a new lease of
life since it was revived as a
millennium project, and now serves as
a leisure boating resource, alongside a
key active travel route and part of the
National Cycle Network. These
monuments and archaeological
legacies are part of the rich tapestry of
development in West Dunbartonshire
which is of national and even
international interest and marked it as
a place of significance, even before the
Page 89

Page 90

manufacture of prestige liners and
battleships put Clydebank’s
shipbuilding on the global stage. 
Singer Sewing Machines, John
Brown’s, Denny and Turkey Red Dye
are a few of the industries which
helped to drive the growth of
Dumbarton, Clydebank and the towns
in the Vale of Leven. These towns all
now benefit from a mixture of housing,
from historical conservation areas to
contemporary developments coming
together in strong communities. The
lasting legacy of this industry can also
be seen in the range of opportunities
which exist for new industrial, business
and housing development. These
opportunities include key waterfront
sites: Queens Quay, Clydebank; the
former Oil Refinery at Carless, Old
Kilpatrick; and Esso, Bowling. Although
the area has experienced changing
fortunes since the economy has shifted
its focus away from the heavy
industries which grew up along the
Clyde, the North Clyde Riverside is still
a key investment location for
international businesses such as
Chivas and Agrekko, as well as, a
wealth of enterprises of all scales.
A Promising Future
This guide seeks to ensure that new
development recognises and responds
to West Dunbartonshire’s unique
location, making the most of the
waterfront and connecting into the
outstanding green network
opportunities provided by its setting. 
Our ambition is to build on West
Dunbartonshire’s unique history and
heritage, providing high quality
development and thriving places for
the people of West Dunbartonshire.
Development of Dumbarton Harbour,
Exxon and Carless sites  and the
Queens Quay site in Clydebank, are
critical for bringing formerly vacant
sites back into use. These and other
sites provide opportunities to bring the
rivers back into the hearts of the
communities, through high quality
development which provides health,
wellbeing and environmental benefits
which stretch beyond the site boundary
into the wider community.
Page 90

Page 91

Status of this guidance
The Council recognises that the
creation of high quality places is
strategically important to bring people
into the area and make it an attractive
place to live, invest and visit. This is a
key ambition of the West
Dunbartonshire Local Development
Plan (LDP2) and supports the delivery
of the Council’s Local Outcome
Improvement Plan; the Plan for Place
2017-2027, and the priorities set out in
the Council’s Strategic Plan 2017-
2022. 
It is intended that this guidance will be
adopted as statutory supplementary
guidance, forming part of Local
Development Plan 2. It provides further
detail about how to meet the
requirements of the Creating Places
policies of Local Development Plan 2.
Using this Guidance
This guidance does not set out
prescriptive standards for design but
uses examples to highlight how a well-
considered design led approach can
contribute to successful and
sustainable places. 
The guidance supports innovative and
creative design, by not being
prescriptive about architectural styles
and details. However a design led
approach based on a thorough
appraisal of the site and an analysis of
its context is a prerequisite for a high
quality development and is expected
for all development proposals. 
The examples, many of which are from
developments in West Dunbartonshire,
show where a design approach has
worked well for a particular site, rather
than illustrating a feature which should
be repeated. 
Following this introductory section, the
document is split into the following
sections: 
Successful Placemaking Process
This section details the process for
successful placemaking including the
support that the Council will provide
through its pre-application service as
well as providing guidance on Local
Development Plan 2 Policy CP3:
Masterplanning and Development
Briefs and Policy CP4: Place & Design
Panel
Design Considerations
This sets out and illustrates successful
approaches to key considerations for
each heading of the Local
Development Plan 2 Policy CP1:
Creating Place and Policy CP2: Green
Infrastructure.
This section also provides design
guidance in relation to other policies
and sections of LDP2 showing how the
criteria under Policies CP1 and CP2
relate specific types of development,
such as waterfront or town centre
development. 
.
Page 91

Page 92

Policy Context
National Policy
The Scottish Government places a
strong emphasis on placemaking and a
design-led approach within the
planning system. This approach is set
out within the Place Principle,1
embedded within Scottish Planning
Policy, as well as other key Scottish
Government policy documents
Designing Streets and Creating
Places.
This guidance sets out how
development in West Dunbartonshire
can meet the requirements of Scottish
Planning Policy in order to create
successful and sustainable places.
1 https://www.gov.scot/publications/place-
principle-introduction/
National Guidance
This document provides local guidance
in relation to the National Roads
Development Guide and Cycling by
Design. A well designed movement
network which puts the needs of
pedestrians at the top of the street
design hierarchy is a key aspect of
Designing Streets supported by these
documents and this guidance.
Development Plan
West Dunbartonshire’s development
plan consists of the Clydeplan
Strategic Development Plan and the
Local Development Plan 2 (LDP2) in
addition to supplementary guidance,
although this will change with the
implementation of the provisions of the
Planning (Scotland) Act 2019. 
This guidance supports the Creating
Places policies of LDP2:
• Policy CP1: Creating Places
• Policy CP2: Green Infrastructure
• Policy CP3: Masterplanning and
Development Briefs
• Policy CP4: Place and Design
Panel
Policy CP2: Green Infrastructure is
also supported by the Green Network
and Green Infrastructure
Supplementary Guidance, which is
closely linked to this document. These
two guides should be read in
conjunction with each other for all
development.
Page 92

Page 93

Successful Placemaking Process
Placemaking is a creative, and iterative
process which uses a design led
approach and collaborative refinement
of proposals to create successful and
sustainable places.
“Research shows that the way places
function, look and feel can influence
our health and wellbeing…..Improving
the quality of places and the
opportunities we have access to can
help to tackle inequalities.”2
In West Dunbartonshire we encourage
a design led and green infrastructure
first approach to placemaking which
builds on our existing assets to achieve
outstanding development which can be
enjoyed by our communities.
2 https://placestandard.scot/place-standard.pdf
Design Team
In order to achieve high quality design
outcome, we encourage the use of an
architect and landscape architect on all
but the smallest applications. Smaller
scale developments should have an
architect as a minimum, while larger
proposals may involve a range of
different specialisms to bring expertise
in landscape, urban and/or street
design. Specific site constraints may
require specialists such as ecologists
to be involved. Proposals for listed
buildings and conservation areas
should be brought forward with the
help of suitably qualified professionals
with an expertise in the Historic
Environment.
The Council cannot recommend
particular practices or companies, but
in order to assist you in in identifying
suitably qualified professionals links
are provided at the rear of this
document to relevant chartered
institutes, which have registers of
those which meet their standard of
qualification.
Collaboration
Meaningful engagement is essential for
ensuring that a proposal contributes to
the creation of successful and
sustainable places. This includes early
engagement with the Council, who will
provide advice and guidance to inform
the design development, including
through the Place and Design Panel if
appropriate. Through its pre-
application advice service the Council
can provide guidance on known site
opportunities and constraints, as well
as advice on who the key stakeholders
will be for the proposal and how to
approach engagement.
Meaningful engagement with the
community, including children and
young people, is also a key part of
getting the best possible outcome. The
community will have local knowledge
which goes beyond what can be seen
on site. A Local Place Plan or other
spatial guidance may capture some of
this; if local spatial guidance is not
available, community views should be
sought as part of the appraisal
Page 93

Page 94

process. The Place Standard is a
useful tool for capturing community’s
views of their place and aspirations for
its future.
Consultation should also be used to
test options for a development
proposal with the community. This
should include widespread public and
stakeholder engagement, as
appropriate and advised through the
Pre-Application process. 
For medium and larger scale
developments there will be an
expectation that 3D visuals will be
produced. It would be beneficial for
them to be produced at an early stage
to support engagement activity.
Images showing the topography and
adjacent buildings or the surrounding
context may be required for some
developments. This will enable a better
understanding of how the proposals
might look in real life.
The Council produced a 3D Flythrough
of the development proposals for the
housing site at Aitkenbar, this helped
officers and the public to visualise the
design of the proposals.
Page 94

Page 95

Planning Applications
Early engagement with the Council’s
Pre-Application Service is strongly
encouraged. For Major Applications it
is expected that this will be before the
submission of a Proposal of
Application Notice. For all
developments it is advised to engage
with the Pre-Application Service to
discuss early concepts for the site
including potentially a range of different
options, before key design decisions
are taken.
The Pre-Application Service will set out
the level of information that is likely to
be required in order to support the
planning application. This could include
specific studies or consultation
requirements which it will be beneficial
to be aware of in terms of project
planning. This will be in proportion to
the scale of the development and type
of application. Failure to undertake
necessary studies at an early stage
can result in costly redesigns later.
The use of processing agreements is
encouraged for major or complex local
applications. The requirement for this
as well as timing of attendance at the
Place and Design Panel will be
clarified as part of the Pre-Application
Service. 
Development Management has a pre-
application form which applicants are
asked to complete so as to ensure that
officers are provided sufficient
information to be determine the level of
pre-application service which will be
required for the development. An initial
site appraisal should also be provided
to aid in identifying the requirements.
All enquiries relating to new
development proposals should be
directed to Development Management
in the first instance. Where required,
the case officer will consult other
Council services, such as Roads or
Environmental Health.
Where a proposal is likely to require
Roads Construction Consent, the Pre-
Application Service will include
facilitating the early involvement of the
Roads Service so that the teams can
work closely together to ensure that
that proposals meet the requirements
of both services.
The Pre-Application Service will advise
of requirements for Listed Building
Consent or Conservation Area
Consent and where appropriate will
seek input from Historic Environment
Scotland.
At the former Council Offices at
Garshake Road, Dumbarton a design
brief highlighted the local significance
of the mature trees on site, the
developer therefore was required to
undertake a tree survey so that a
solution could be prepared which made
the best use of these existing assets.
This resulted in a proposal which
protects the local character.
Page 95

Page 96

Policy CP3 Masterplanning and
Development Briefs
This policy sets out the requirement for
the preparation of masterplans or
development briefs for the sites within
the Delivering Our Places section of
the Local Development Plan 2 as well
as other major or complex applications
such as those within sensitive locations
or which are likely to have significant
environmental impact. 
The sites identified within Schedule 1
of Local Development Plan 2, for which
there are existing or proposed
masterplans or development
frameworks, are supported by this
policy. Where appropriate, this spatial
guidance, or any subsequent revisions
which emerge in the lifetime of the
plan, will be taken forward as
Supplementary Guidance. All other
spatial guidance will be taken forward
as non-statutory planning guidance. 
Development proposals within
conservation areas should make
reference to the relevant Conservation
Area Appraisal and Management Plan
where one is available. This will help
gain an understanding of the special
character of the place which proposals
should respond to.
Site specific guidance for sites within
the Delivering Our Places section of
the Local Development Plan 2 should
accord with the associated
development strategy; they will
however be more detailed, visual and
form based than the Development
Strategy. Development proposals
should accord with the principles set
out in the approved site specific
guidance. 
Proposals which are brought forward
prior to the adoption of the required
site specific guidance will only be
supported where the required guidance
is prepared as part of the planning
application and accords with the
principles set out in Local Development
Plan 2.
Any such guidance should be for the
entire Delivering Our Place site as
identified within the Local Development
Plan 2 so as to avoid piecemeal
development of these key regeneration
sites.
Applicants will be directed to the most
up to date spatial guidance through the
Pre-Application Advice Service.
Page 96

Page 97

Policy CP4 Place and Design Panel
The Place and Design Panel3 is a
valuable resource available to
applicants for major and locally
significant developments. Through the
Place and Design Panel, the Council
will seek the expertise of relevant
professionals to assist with reviewing
proposals. This is intended to support
applicants’ design team and should not
be seen as a substitute for appointing
suitably qualified professionals.
Policy CP4 embeds the work of the
panel within the statutory planning
process so as to ensure that new
development contributes to
outstanding places and design in West
Dunbartonshire.
Proposals which have been to the
panel should show how
recommendations of the design panel
have been considered within Design
Statements. This should include
providing justification for
recommendations within the panel
3 Place and Design Panel Terms of Reference can
be found here
report which have not been taken
forward.
The advice provided by panellists may
not always reflect Local Development
Plan 2 policies or other Council
guidance and strategies. The
Development Management Team will
endeavour to clarify this context prior
to panel sessions; and panel reports
will note where panel
recommendations do not fit with other
polices.
Page 97

Page 98

Design Considerations
Character and Identity
West Dunbartonshire, its towns and
villages have distinctive identities,
which new development should
contribute positively towards. In order
to do so, design proposals must be
based on an understanding of the
physical and environmental
characteristics of the site, as well as,
its surrounding area.
A thorough appraisal of the site and its
surroundings must be undertaken in
order to build up this understanding.
The appraisal should consider the
established patterns of development,
natural features, physical constraints
and the historic environment. Evidence
of the appraisal should be provided
within Design and Access Statements.
Consideration should be given to the
setting of the site, its character and the
connections that can be made to it and
through it which link it to its
surrounding area. 
Setting
Existing landforms and natural features
should be retained where they
enhance the existing character and
appearance of the area.
Established patterns of development
should be respected. This will provide
continuity and diversity within the
urban structure, allowing the
development to fit in while having its
own identity as a place.
The size, scale, form and siting of
buildings should respond appropriately
to the topography of the site and area,
as well as, the form of buildings which
are nearby. Building lines, set-backs
and boundary treatments all contribute
to an area’s character; where there is a
strong established development form
proposals should respond to this
appropriately.
The Clyde, Leven and Forth and Clyde
Canal have a special place in the
history and culture of West
Dunbartonshire. Development near to
and adjacent to these assets should
acknowledge this and address the
water. This means retaining,
connecting to, or constructing, paths
along the waterfront as well as
orientating buildings so that they
overlook and present active frontages
to the waterfront and its adjoining
paths. The view of the development
from the water, and any waterfront
pathways should also be carefully
considered. Gable arrangements and
frontages will provide variety and visual
interest.
Sites at the edge of the urban area can
have challenges of topography or
drainage. A landscape led, green
infrastructure first, approach to these
challenges can make the most of
existing environmental assets. Sites
which were formerly in the greenbelt
will be expected to create a strong and
reinforced greenbelt edge as part of
the landscape scheme. The key
challenge for these sites is giving the
development a unique character which
fits within the surrounding context.
Production of a landscape strategy at
an early stage of the design
development will be valuable where
the site was previously undeveloped or
had naturalised.
Page 98

Page 99

Development of gap sites or
redevelopment of buildings, especially
need to respond sensitively to their
surroundings while ensuring amenity
for residents. Where there is strong
continuity of character this will include
respecting building lines; plot shapes
and sizes; building and ridge heights;
and providing continuity in boundary
treatments. 
An increase in height, or coming
forward of an established building line
is only likely to be appropriate when
the intention is to create a landmark
feature, for example at a corner site.
More variation may be appropriate if
the area already has variation in the
development pattern. The use of
similar materials can help an infill
development fit into its setting, as can
responding to architectural features
such as horizontal emphasis in window
openings.
The specific needs of industrial
development uses will be a key driver
for the design of proposals,
consideration of the wider impacts of
the proposal can lead to higher quality
design.
The Malin Group is in the process of
developing a large fabrication
workshop at Carless, Old Kilpatrick.
The nature of the processes to take
place mean that the unit is very large in
scale and highly visible from
surrounding area. For this reason an
iconic design approach was taken to
give the building a landmark quality
when viewed from afar.
Page 99

Page 100

Character
Landmark buildings and structures,
vistas and gateways, help to define
areas which are distinctive. Creating,
protecting, and enhancing these
features will add to the character of the
area.
The colour, texture, pattern and
appearance of materials, as well as,
architectural styles and details can
enhance the character and amenity of
the area. Where appropriate materials
and architectural styles should reflect
the historic character of the site or
create a distinctive sense of place.
Historic buildings, structures and
routes which positively contribute to
the local identity should be integrated
into development proposals or restored
where feasible. Development of
historic buildings or areas with a strong
historic character must be approached
with sensitivity. Historic elements, such
as railings and walls as well as trees
and hedges must be preserved where
these contribute positively to the
character of the area. This approach is
also supported in historic areas which
are not designated conservation areas.
The Creveul Court social housing in
Alexandria town centre, responds to
this setting by recreating the original
street pattern and reflecting the scale
of surrounding buildings. This creates
a continuity in the urban form which
helps the new development to fit into
its surroundings.
Page 100

Page 101

Connections
Where there are established streets,
paths and desire lines; or connections
between green spaces through the site
development proposals should retain,
connect to and reflect the character of
these adjoining connections.
Views into, out of, and across a site
can help to visually connect the
development into its surroundings.
Consideration should be given to how
views can be protected, enhanced or
created.
Lighting schemes, signage and public
art can aid orientation, as well as,
contributing to a place’s distinctive
identity. 
The visual connection through the site,
for example towards a waterfront, can
be just as important as the physical
connections through the development.
Particularly at waterfront sites, some
sightlines of the water should be
preserved.
The Council offices at 16 Church
Street, Dumbarton restored and
retained the historic college building’s
facade, preserving an important
landmark for the town. The use of
sensitive materials such rustic blonde,
multi brick and hosepipe pointed
mortar complement the Kenmure
sandstone and lime mortar of the
retained façade enabling the modern
energy efficient extension to enhance
the historic character of the town
centre.
Maintaining this landmark building
which is highly visible around the town
helps to ensure that visual connections
to the wider area are preserved.
Page 101

Page 102

Street Design
Successful places have streets which
are designed to meet the needs of all
users and consider their function as
part of the public realm; rather than
having roads which are only designed
for the efficient and safe movement of
vehicular traffic.
This is a key requirement of Designing
Streets which places the needs of
pedestrians and cyclists at the top of
the street design hierarchy to
encourage these more sustainable
modes of travel. 
Consideration of the role of streets as
places for people will help to ensure
that new streets in West
Dunbartonshire are safe, comfortable
and attractive for all users, as well as,
creating an accessible, inclusive and
walkable network of streets and paths
in line with the requirements of
Designing Streets.
Pedestrians
The structure of streets should enable
safe, direct, inclusive and attractive
pedestrian access to existing routes,
places of work, amenities and public
transport connections. A permeable
network of streets and paths are
preferred to cul-de-sac arrangements
because they are more walkable.
Footways should be wide enough to
accommodate pedestrians of all
abilities and street furniture, as well as,
outdoor activity associated with
adjacent uses such as outdoor
displays or seating areas. Where street
furniture is proposed, accessibility for
people with wheelchairs or strollers
should be considered and unnecessary
clutter avoided.
All pedestrian routes should be
overlooked to increase passive
surveillance. Accommodating
pedestrians within the street instead of
segregated routes further adds to the
eyes on the street which provide a
safety benefit for all users. 
Connections to public transport must
be considered from the outset and
walking and wheeling routes to public
transport links should be direct, safe
and attractive.
By creating a pedestrian priority area
which is overlooked by windows and
entrances this development in
Eaglesham, East Renfrewshire has
created a space which is safe for play
rather than being car dominated. The
inclusion of porous paving and street
trees highlights that this area is not just
for cars.
Page 102

Page 103

Cyclists
Development should support the
provision of cycling infrastructure for all
levels of cycling ability, including both
leisure and functional trips. Cycling
routes should be safe, direct,
continuous, comfortable and attractive.
Developers are required to follow the
guidance set out in Cycling by Design4.
Connections into, and creation of, a
cycling network should be considered
for all sites; with those sites adjacent to
existing cycle paths being required to
provide direct connections to them. 
Where a street requires to be designed
to have greater carriageway width for
public transport; a higher design
speed; or for heavy goods vehicles in
industrial and business locations, then
measures such as segregated
footways and cycleways will be
required.
Secure cycle storage must be provided
for all development. For flatted
development, this should be on the
4 Cycling By Design, Transport Scotland, 2021
ground floor, sheltered and providing
space for at least one bicycle per flat.
This new cycle link at Centre 81,
Clydebank improves access to the
National Cycle Network along the
Canal towpath. Improving connections
to this key asset should be considered
for all development proposals which
are near to it. This new connection
uses high quality materials and public
art highlight the status of this key route.
Vehicles
Access for service vehicles should be
considered early in the design process
so that these needs can be
accommodated without undermining
the quality of the place.
The character of a streets should
reflect their importance and intended
use; forming a hierarchy of streets. The
design speed of new residential streets
should not be more than 20mph. 
Streets should be designed to naturally
limit speed without the need for speed
bumps or other traffic calming
measures which adversely impact on
the quality of the place. Narrowed
carriageways, limiting forward visibility;
constrained corner radii and material
texture or colour are preferred methods
for reducing the design speed of
streets.
Pedestrian priority streets may be
acceptable in areas where there will be
low traffic speed and volumes.
Pedestrians of all abilities must be
Page 103

Page 104

considered and consulted when
designing pedestrian priority streets.
Pedestrians who are visually impaired
can be disadvantaged by poorly
designed pedestrian priority areas.
Design features such as retaining
some kerb definition or segregating
cycle routes at below footway level can
help visually impaired users navigate
pedestrian priority areas. Where a path
is likely to be used by a lot of cyclists,
demarcation of the route with different
materials and a change of level can
help to limit conflict and make the area
more navigable for the visually
impaired. 
This development in Coswig, Germany
has a wide shared path for pedestrians
and cyclists at its heart. Access and
parking for vehicles is pushed to the
perimeter of the development to help
create a comfortable pedestrian
environment. Pedestrians and cyclists
can share this route due to it being
sufficiently wide. 
Parking
A variety of parking arrangements
should be included as part of a design
led approach to emphasise the
hierarchy of streets and add to legibility
of the place. This should include
disabled spaces in the most accessible
locations; electric vehicle charging and
cycle parking facilities.
Parking requirements should mainly be
met within a well-designed streetscape
or between gables. Front garden
parking will not generally be supported
and will only be accepted as a small
element of a variety of different parking
arrangements. 
The need for parking should be
considered as part of a wider travel
plan for the development as well as
within a Transport Assessment as
appropriate.
A reduction of the Council’s parking
standard will be encouraged for sites
which are in accessible or town centre
locations and close to public transport
hubs.
Page 104

Page 105

Materials
A range of materials and treatments for
streets and pedestrian routes should
be used to highlight user priority, calm
traffic and manage surface water run-
off. All materials should be of a quality
that is resilient to maintain their
appearance and reduce long-term
maintenance costs over time. Special
consideration should be given to
ensuring that materials are sufficiently
robust in areas which will be highly
trafficked or regularly accessed by
heavier vehicles.
Street design should incorporate
elements to facilitate sustainable
surface water drainage, such as green
infrastructure, permeable paving and
innovative swales.
Services should be accommodated
within the design of the street without
having undue influence on other
aspects of the design, such as the
location of greenspaces, width of
pavements, or location of street trees.
Ducting of utilities and maintaining
services together will be encouraged
particularly where high-quality
materials are proposed.
Great Kneighton, Cambridge, by
Proctor & Matthews, uses a mixture of
parking courts, undercroft and on
street parking to ensure parking needs
are met while creating a safe and
pleasant environment for pedestrians.
Changes in materials are used to
highlight pedestrian, shared and
trafficked areas of the streetscape
creating variety and interest.
Page 105

Page 106

Green Infrastructure
The green network is a highly valued
asset in West Dunbartonshire. New
development is expected to contribute
positively to this, by taking a green
infrastructure first approach to
development, preferring green
infrastructure solutions for the delivery
of on-site water management;
biodiversity; access networks and open
space.
Each of these functions is required to
be protected and enhanced by Policies
CP1 and CP2 of LDP2, as well as, the
Green Network and Green
Infrastructure Guidance.
This guidance shows how an
Integrating Green Infrastructure
approach can deliver a “fit for purpose”
green network and highlights how
layering these functions together can
contribute to a high quality
multifunctional green network, with
multiple benefits for health, wellbeing,
wildlife, as well as, climate change
mitigation and adaptation. 
Water Management 
The Integrating Green Infrastructure
first approach should start by
considering the ‘water journey' through
a development site.
A surface water management plan
should be based on naturalised SUDS
features, which provide a framework
for the layout of the development.
Surface water run‐off must be routed
through SUDS before it is drained into
the water environment.
Adequate space to accommodate
SUDS must be included within site
layouts, especially when considering
applications for planning permission in
principle. SUDS systems should be
multi‐functional, creating a positive and
distinctive landscape setting and
maximise the site’s biodiversity value. 
The design of SUDS should respond
sensitively to site topography and
landscape character. SUDS ponds with
an edge gradient of 1:6 or 1:8 will have
greater accessibility and multi-
functionality and are encouraged.
Underground retention tanks should
only be used where management of
water at surface level, has been
demonstrated to not be viable.
Where SUDs are proposed, in areas
where there is a mining legacy,
consideration should be given to the
implications of this in relation to
potential stability and public safety
risks. Developers should seek advice,
from a technically competent person,
to ensure that a proper assessment
has been made of the potential
interaction between hydrology, the
proposed drainage system and ground
stability, including the implications this
may have for any mine workings which
may be present beneath the site.
The green infrastructure first approach
should also be applied to industrial
development. Drainage solutions which
manage rain water at surface level are
encouraged; especially green
solutions, such as planting or green
roofs. 
Page 106

Page 107

Examples of different SUDS solutions.
Rain  Gardens
Shallow depressions planted with species
able to tolerate short periods of
inundation in free‐draining soil.
Slows rainfall run‐off received from a
downpipe or hard surface and offers
some filtration.
Filter strips
Vegetated, usually grassy, areas of
broad, flat and gently sloping land
over 1m wide which intercept
rainfall run‐off from a site as
overland sheet flow. Can be planted
with native plants to create useable
open space including wildflower
meadows
Permeable (or porous) surfaces Including
block pavers and some forms of concrete
which allow water to drain through
vertical holes or gaps between individual
units. Allows run‐ off to percolate
naturally into the ground or a collection
chamber, reducing run‐off from hard
surfaces.
Bio‐retention areas
Landscaped shallow depression
specifically to capture and remediate
polluted run‐of from roads and car
parks. Reduces run‐off at localised
flooding.
Can be formally landscaped with
shrubs and herbaceous plants.
Swales
Linear, shallow channels that
specifically transport water, for
example from one SUDS feature to
another. Slows down run‐off and
allows natural infiltration into the soil.
Detention basins
Vegetated basins which temporarily
hold water allowing gradual
infiltration into the soil and removal
of pollutants.
Potentially high ecological value.
Ponds
Permanent water bodies which can add
significant value in terms of amenity and
biodiversity. Over‐engineered and fenced‐
off ponds should be avoided to ensure
SUDS ponds are integrated into the
landscape.
Further detail on SUDS is provided in best practice guidelines issued
by SEPA and CIRIA.
Page 107

Page 108

Habitat Enhancement
Landscape design should be
consistent with the wider landscape
character, for example, continuation of
a nearby woodland or formation of
semi‐natural grassland on rural
fringes.
Existing site conditions, for example,
type of soil, topography and drainage,
will help determine what works best for
a site.
Naturalised SUDS are encouraged and
should be designed to create
opportunities to enhance and expand
wetland and create other habitats for
biodiversity.
Existing habitats should be retained
and enhanced by providing links to
wider greenspaces or riparian corridors
to address habitat fragmentation.
Inclusion of biodiversity features, such
as resting and roosting boxes, bee
bricks and green roofs, within buildings
will be supported.
Specimen tree planting is encouraged
in key locations such as entry points,
along major paths or in public spaces.
Planting should mostly be appropriate
native species and seek to create a
varied structure of wildlife friendly
trees, shrubs and flower rich meadows
providing food, shelter and breeding
places for wildlife. 
Planting design should consider how to
maintain seasonal interest and be
linked with SUDS features.
There should be a balance between
habitat protection and access. Some
sites may need low impact design
solutions, e.g. boardwalks in wetlands
or wildlife-friendly lighting.
Interpretation boards can be used to
promote responsible access and
provide on-site education
opportunities. Some routes may need
to be designed to avoid disturbance to
sensitive areas.
The emerging Developing with Nature
guidance from NatureScot describes a
number of measures which can be
incorporated into development to
enhance nature. 
This development in Jordanhill,
Glasgow retains and enhances
woodland setting of the former college
campus to create a unique
environment for new build housing.
This interpretation board highlights the
importance of retaining biodiversity by
identifying this sycamore as the oldest
tree on the campus having survived
more than 150 years. In the
background the play area features
wooden equipment to better suit the
area’s woodland character.
Page 108

Page 109

Access Networks
Paths should try to reflect desire lines
and minimise road crossings where
possible.
Development proposals may require to
enhance existing path connections or
form new connections to improve
accessibility to the wider green
network.
Path connections should be to
destination points such as schools,
shops and transport hubs with cycle
parking at these location or for access
to leisure or woodland;
The banks and margins of
watercourses and canals often provide
effective and attractive access routes
for walkers, cyclists and horse-riding.
Naturalised SUDS provide a similar
feature and a potential location for
active travel routes separate from the
road network;
Paths should be compliant with
Equalities Act 2010 and of a
construction standard and width
appropriate to the level of use. They
should be designed to withstand water
run‐off or incorporate SUDS to improve
drainage. Main routes should be to an
adoptable standard, however, self‐
binding materials may be appropriate
for minor or secondary routes.
Consideration should be given to the
needs of all users when designing
paths for multiple-use. This should
include walking, wheeling, cycling and
horse-riding as appropriate.
Paths should generally have wide
verges with no fast growing plants
which could reduce sight lines or
create hiding places. Entrances
should be wide and avoid use of steps
or steep gradients.
Unnecessary barriers on paths are
discouraged as they can limit
accessibility for all users.
Typically on the edge of settlements
these suburban housing should make
the most of strong green network
connections, trees on site and
opportunities to connect to the wider
countryside.
The recently completed Council
housing development at the former
Haldane School focussed on ensuring
good access to the neighbouring park
via a woodland walkway.
The Athletes Village in Glasgow
included a strong green infrastructure
framework from the outset. Swales are
integrated into the streetscape to
manage rainfall at surface. These
green elements are designed to be
safe and accessible meaning they did
not require to be fenced off.
Page 109

Page 110

Open Space
Open space requirements within
developments should be coalesced
into larger multifunctional spaces
unless the specifics of the site dictate
otherwise.
Distinctive landscape features or local
habitats should be retained and
enhanced to help form locally
distinctive spaces.
Allotments and growing grounds can
provide a recreational benefit for a
wide range of age groups if included
within the open space provision.
Open spaces should have clearly
defined public/private boundaries and
features to prevent unauthorised
vehicle access.
Amenity open space around buildings
should be appropriate to the scale of
the building. This should avoid creating
large areas of unusable open space,
whilst still providing the necessary
defensible space to ground floor uses.
A sense of ownership can be created
through design, use of quality materials
and community involvement at an early
stage.
Open spaces should have good natural
surveillance with properties
overlooking. The arrangement of
corners, fencing or landscaping should
be considered so to not create blind
spots. Open spaces should be well‐lit,
e.g. using downlighters, at key areas
such as entrances.
Children’s play areas and kick‐about
spaces should be in a central or
accessible location and not positioned
to the rear of dwellings.
Children’s play areas and/or multi-use
games areas must comply with the
British and European Standard for
playground equipment and surfacing,
namely BS EN 1176.
Children’s play areas should include a
number of pieces of equipment
appropriate to their scale and the area
which they serve. Major applications
and/or developments in an area where
there are no play areas within 400m,
will require to have at least 6 pieces of
equipment.
Page 110

Page 111

All play areas must include appropriate
accessible play equipment, so that
they can be enjoyed by users of all
abilities. Consideration should be given
to ensuring that there is equipment for
all age groups including children aged
11 and older.
Play areas should incorporate a variety
of innovative play equipment.
Innovative approaches such as play
along the way, where equipment is
spread across the site or natural play
equipment, will be supported where it
is incorporated into the multifunctional
green network and provides accessible
equipment.
Detailing, such as fencing, surfacing,
seating, bins and signage should
reflect characteristics and materials of
the local area;
Multi-use games areas (MUGAs)
should be separated from footpaths to
limit impacts on passers-by; planting
and trees can create a visual and noise
buffer between these uses. Facilities
and fittings should be suitable for their
intended use; be robust and consider
their future maintenance.
Layout and Form
The relationship between buildings,
streets and spaces has a significant
impact on whether a place will feel
welcoming and comfortable for all
users. The layout and form of these
should protect and enhance the
amenity of existing communities, future
occupiers and neighbouring
development sites.
Urban Structure 
Development should form part of the
wider network of streets and spaces,
reflecting the character of the place in
which it will be built and responding to
this character to create its own identity.
Buildings should positively define and
enclose streets and open spaces by
fronting onto them with windows and
entrances/doors facing towards them;
this will provide active frontages and
passive surveillance.
Building lines and setbacks should
emphasise the spaces that the
buildings address and reflect the
character of their location. Strong
existing building lines and setbacks
should be reflected and reinforced. 
Designing buildings so that they are
forward of the building line may be
appropriate at junctions where it can
add to the legibility of the place.
Page 111

Page 112

Kippen Dairy, Alexandria follows the
existing building line, but then steps
back to denote a large area of open
space adjacent to Main Street and the
Smollett Fountain.
Streets, Blocks & Plots
The size and shape of development
plots should not limit opportunities for
future changes in use, development
form and extensions over time.
Where larger plots are required for
commercial, industrial and civic
buildings, rear elevations and servicing
should not be orientated towards the
street and pedestrian connections
through the site should be maintained.
The proportion of the plot that is
developed should ensure the all
residences have access to usable
private or shared amenity space for
leisure or drying. This should be in
addition to space which is given over to
parking, cycle storage, bin stores or
other servicing requirements.
Where communal gardens are limited
or cannot be provided for a flatted
development, for example within town
centres, balconies and/or a roof garden
may provide useable outdoor space for
residents to dry laundry or grow potted 
plants.
The relationship between public
frontage and private space to the rear
should be consistent and will generally
result in a perimeter block. 
Private spaces should be clearly
delineated and defensible with
appropriate boundary treatments.
Page 112

Page 113

Density & Mix
Mixed use development is encouraged
where it will enhance the vibrancy and
walkability of the community. This
means the inclusion of small ancillary
and compatible uses such as shops,
nurseries or leisure facilities within
residential, industrial or business led
developments will be supported where
it can be demonstrated that they meet
the terms of Policy SC5 Ancillary Retail
Uses. 
Larger developments should consider
including land or units for the future
provision of neighbourhood services,
as indicated in the preceding
paragraph, where these are not
already available within a 10 minute or
800m walking distance.
The density of a development should
ensure the efficient use of space while
reflecting and responding its location
and context. Higher density forms will
be accepted in locations which are
most accessible and which contribute
to the legibility of the place, such as
corners and main streets.
Large-scale development should have
a range of densities, scale and
massing across the site to add vitality
and character to the place. For
residential development, a range of
dwelling types and sizes should be
included within the development to add
visual interest and meet the needs for
a range of different household groups;
mixed tenure developments are also
encouraged.
Higher density and urban development
forms are required for all town centre
and edge of centre sites. Proposals
should consider the tenement form for
main streets within town centres.
Typically 3 to 4 storey tenements are
characteristic, although consideration    
of the setting of the site will give an
indication of what height is suitable. 3
storey townhouses may be appropriate
for quieter streets and edge of centre
locations.
Mixed use approach is particularly
encouraged within town centres. Non-
residential units should be delivered at
the ground floor of developments,
particularly on main streets or corners.
Where other non-residential uses are
proposed at ground floor, consideration
should be given to how these uses
relate to the street, particularly
orientating internal areas with high
levels of activity towards the street. 
Locating outdoor seating and
interesting window displays towards
this open space adds vibrancy and
visual interest to this public space in
Meissen, Germany.
Page 113

Page 114

Height & Massing
The massing, spacing and orientation
of buildings must respond to issues
such as solar orientation and prevailing
wind, in order to ensure resource
efficiency and provide opportunities for
renewable energy generation.
Overlooking, privacy and the ability for
sunlight and daylight to reach habitable
rooms and garden ground will be key
considerations for both development
height and building-to-building
distances.
18m separation between directly facing
windows of habitable rooms is a
guideline for ensuring privacy for
residences. This distance may require
to be wider for taller buildings; allowing
sunlight to reach amenity spaces
between blocks. Where windows are
not directly facing, some reduction of
this may be appropriate. Where an
innovative design or site constraints
require less space between buildings,
internal space arrangements or
window profiles should be considered
to ensure privacy.
North facing gardens; gardens which
are at a lower level than neighbouring
properties; or gardens with significant
areas given to retaining walls, may
require to be longer to provide useable
space and sunlight, the 18m guideline
may not provide sufficient space in
such circumstances.
The space between gables has a
strong influence on the character and
amenity of a street. As a minimum this
should allow homeowners to walk
between the gable and boundary fence
and in some instances may be greater
depending on house size and
character of the area. 
A more generous space of at least 3m
from gable to fence would allow future
extension of the property or a driveway
to be formed on one side. Driveways to
the side are preferred for detached,
semi-detached and end-terrace
properties. Front garden parking is
discouraged. 
Higher buildings within a development
can also be used to signify key
locations within the site such as open
space or connections to local access
networks.
The gable at this corner building at
Irvine Harbour, North Ayrshire creates
a sense of height which signifies the
edge of the development. It has a high
level of visual interest, and fronts onto
an area of public realm with public art
to signify that this is a key location
within the layout.
Page 114

Page 115

Buildings and Materials
The form of individual buildings and
materials used can have a significant
impact on how people use a place as
well as its long term economic and
environmental sustainability.
The orientation of buildings and
consideration of the activities that take
place within them and around them
help places to be attractive and
welcoming.
Energy efficiency, robustness, climate,
historical character and aesthetic
considerations will all contribute to the
decision about which materials are
appropriate for a site. A design led
approach to the materials will ensure
that the development proposals fits into
its setting and will continue to have a
lasting positive impact for the
community.
Buildings
Main entrances should be identifiable
and address the public realm. Where a
building is located at a corner, the main
entrance should reinforce the hierarchy
of streets and provide emphasis at the
corner.
Buildings at corners should be carefully
designed to help people find their way
around or to indicate that they may be
entering a new place. Consideration
should be given to how corner
buildings relate to existing built forms;
responding to the established building
lines or heights.
Buildings which have community uses
or amenities serving the surrounding
area should be easily identifiable and
recognisable as a focal point.
The relationship between the building
and the street should reflect their
respective functions; such as a café
opening out onto a seating area or a
house having a front garden.
The internal layout of a building should
consider which rooms require more
privacy or could be orientated towards
the public realm to create visual
interest or passive surveillance.
All residences should be dual aspect.
Although single aspects cannot be
avoided in some cases, this will not be
acceptable for residences with 3
bedrooms or more, or when the
residence is north facing.
Where possible, buildings should be
capable of being adapted in the future
and be able to accommodate inclusive
access and internal circulation.
Where mixed tenure housing is
proposed it should not be possible to
differentiate tenure due to architectural
form or quality
Page 115

Page 116

Materials
Materials and detailing should reflect
the design approach of the building, as
well as, creating exteriors and
elevations which are visually
interesting when viewed from a range
of distances and assist in creating a
sense of place. 
High quality materials should be
integral to the design of the building to
create an outstanding building and
place.
Ensure materials are of a high quality,
durable and sustainable. Materials
selected should be robust in nature as
well as appropriate to the location and
microclimate. Building detailing should
design out maintenance issues and
enable future replacement or repair.
The use of locally traditional materials
such as sandstone and slate is
encouraged; the recovery and reuse of
these materials during demolitions is
also supported particularly within
historic settings.
Materials and detailing will be a
particular consideration for waterfront
development. More robust materials
and simple details will be required, so
as to be resilient to the elements.
The coordination of materials, colours;
architectural details and proportions
can give a development a unique
identity or assist with reflecting the
surrounding character. Applicants are
encouraged to submit a palette of
materials at the application stage. 
Pre-Application advice or local
guidance may recommend the use of
particular materials and finishes, such
as brick finish, metal in certain
locations. Pre-application advice will
also advise when early clarification of
materials is necessary for certain sites.
Development of demolished historic
buildings, whether listed or otherwise,
should reuse the traditional materials
such as stone, brick and slate where
possible.
Alterations to listed buildings must use
materials which are in keeping with the
listed building and not damage the
historic structures.
The Queens Quay Design Codes
illustrate a range of materials which are
suitable for use throughout the
development. A palette of materials
have been chosen which making
reference to the historic use of the site
and will be stand up to the elements at
this waterfront location.
Page 116

Page 117

Sustainable Design
It is recognised that all development in
West Dunbartonshire will have to
contribute to carbon reduction as part
of the response to climate change. The
design of new developments and the
buildings within them can significantly
reduce carbon emissions.
A fabric first approach which seeks to
reduce the need for heating is
encouraged. The Council is supportive
of proposals which exceed the
minimum building standards
requirements and achieve Silver or
Gold aspect of the building regulations.
The use of carbon reducing technology
such as microgeneration or connection
to local district heating system, such as
the Queens Quay Energy Centre is
also encouraged.
Sustainable Construction
Consider the sustainability of the
development in the overall building
design including the reuse of materials
through the building process. The
reuse of building materials or use of
locally available materials will
significantly reduce the carbon footprint
associated with the development
process. 
The design of the building should aim
to enhance energy efficiency through
solar orientation; passive heating,
cooling and ventilation; as well as,
choice of materials and other such
strategies to improve energy efficiency.
Following the Accredited Construction
Details (Scotland) 2010, will assist with
limiting thermal bridging and air
infiltration as part of the fabric first
approach.
Approaches to achieving net zero
carbon buildings, such as Passivhaus
or those which aim to be carbon
neutral through clean energy
generation are encouraged.
Consideration should be given to the
inclusion of green infrastructure as a
method of reducing carbon emissions,
such as green roofs, green walls or
accessible green decks within the built
form.
The form of development has
significant impacts on the energy
efficiency of individual residences.
Residences with shared walls, ie flats
and terraces, are more efficient, and
lose less heat directly, than detached
houses. More sustainable forms of
development are encouraged where
these complement the character of the
surrounding area.
Non-standard house types and
innovative approaches to increasing
the sustainability of housing
developments is encouraged.
The microclimate can be an important
consideration for sites which front onto
waterfronts, particularly the Clyde.
Page 117

Page 118

Goldsmith Street, Norwich is a
development of ultra-low-energy
homes which are estimated to reduce
annual energy costs for residents by
70%. 
Low Carbon Technology
Opportunities for small scale
renewable energy to be incorporated
within the building as part of the
development or in the future should be
considered. Designs which preclude
the future addition of solar panels will
not be acceptable.
It is anticipated that local heat
networks will become an increasing
part of the energy mix within West
Dunbartonshire. Where one is already
in place, which has capacity to support
a development, properties should be
connected to this utility. In areas where
a heat network is planned,
development should be heat network
ready.
Further guidance on what types of
renewable energy development are
supported and criteria used in
assessment of such applications will
be detailed in the emerging Renewable
Energy Supplementary Guidance.
The Queens Quay Energy Centre.
Clydebank supports an energy network
for the whole Queens Quay site with
network connections available for sites
to the north of Glasgow Road. The
iconic design of the building makes it
landmark at the waterfront to
complement the Titan Crane. 
Page 118

Page 119

Accessibility
The Council is seeking to promote
measures which ensure greater levels
of accessibility across all tenures of
housing in West Dunbartonshire. It is
therefore suggested that a proportion
of housing units across a development
must be fully accessible or able to be
converted to be fully accessible. A
minimum of 10% of properties is
recommended. 
At least one level access should be
provided to all houses; in general this
should be the principal entrance.
Through the Council’s Affordable
Housing Design Guidance, all grant
funded residential development in
West Dunbartonshire is required to
provide 10% of units as fully
accessible. The Crevuel Court
development, in Alexandria achieves
this by being designed to ‘barrier free’
in line with Housing for Varying Needs
Guidance; this allows greater
accessibility and flexibility for future
adaptation.
The development also includes
photovoltaic solar panels to improve
the sustainability of the development
and support fuel poverty reduction in
West Dunbartonshire.
Page 119

Page 120

Appendices
Glossary
Accessibility – The ease with which a
building, place or facility can be
reached by people, goods and services
This includes elderly and disabled
people, those with young children and
those encumbered with luggage or
shopping.
Active Travel – travel that involves
physical activity such as walking or
cycling.
Active Frontage – The frontage or
edge of a building or space that has
windows and doors as opposed to
blank walls, fences and garages.
Adopt – With regard to roads, to add
to the Local Roads Authority’s list of
public roads.
Allocated Parking Spaces – Parking
spaces or driveways which are for the
exclusive use of the residents of the
individual dwelling and their visitors.
Architect – Architect is a protected
term and only those meeting the RIBA
part 3 qualifications and registered with
the Architects Registration Board
(ARB) are legally entitled to call
themselves architects. A link to the
ARB is provided below.
Biodiversity – The variability in living
organisms and the ecological
complexes of which they are part.
Block – The area bounded by a set of
streets and undivided by any other
significant streets.
Built form – Buildings and structures.
Climate Change – the long term shift
in weather patterns such as
precipitation and temperature.
Carriageway – That part of a road
intended for use by vehicular traffic.
Auxiliary traffic lanes, passing places
lay-bys and bus bays are included.
Conservation Area – an area of
specific architectural or historic
interest, the character or appearance
of which it is desirable to preserve or
enhance.
Conservation Area Appraisal – A
published document defining the
special architectural or historic interest
that warranted the Conservation Area
being designated. 
Cycle Lane/Cycleway – Part of the
carriageway intended for use by
cyclists only. Part of the road, but
separate from the carriageway.
Pedestrians and cyclists may share a
cycleway or they may be segregated
from each other.
Daylight – The volume of natural light
that enters a building to provide
satisfactory illumination of internal
accommodation between dawn and
dusk.
Delivering Our Places – the areas of
West Dunbartonshire, including key
regeneration areas, which the Council
wants or expects to change over the
next 5-10 years.
Design Statement – accompanies a
planning application to explain the
design principles and concept of a
proposed development.
Desire lines – The shortest, most
direct route between facilities or
places. Even when obstacles are in the
Page 120

Page 121

way, people will still try to follow the
desire line.
Development Brief – sets out
guidelines and requirements for the
development of a site.
Edge of Centre – a location which is
adjacent to or within easy walking
distance of a Town Centre.
Eyes on the street – People whose
presence in adjacent buildings or on
the street make it feel safer.
Footway – A surface reserved for
pedestrians; can include cyclists if a
core path.
Greenbelt – a policy designation to
direct development to the most
appropriate locations and support
regeneration, protect and enhance the
character, landscape setting and
identity of settlements and protect and
provide access to open space.
Green Infrastructure – functional
elements of a development such as
open space, active travel routes, SuDS
and habitat networks that contribute to
the green network.
Green Network – connected areas of
natural, semi natural and created
greenspace, active travel and
recreational routes, watercourses,
woodland and other habitats that
together form an integrated and multi-
functional network.
Habitat Network – a set of separate
areas of habitat that connect together
in some way to allow a particular
species to be able to move between
each individual patch of habitat.
Housing/Tenure mix – The range of
housing in an area or development in
terms of such factors as its type, size,
affordability, accessibility or tenure.
In-curtilage parking – Parking within
a building’s site boundary, rather than
on a public street or space.
Integrating Green Infrastructure – an
approach to ensure that multifunctional
green infrastructure is included at the
outset of designing successful place.
Landform – The shape of the land.
Landform can be described in terms
such as elevation or shape.
Landscape character – The distinct
nature of an area of land in terms of
such elements as its shape, geology,
soils, vegetation, land uses and
settlement patterns.
Legibility – The quality of a place as
being welcoming, understood easily by
its users and easy for visitors to
orientate themselves in.
Listed Building – building or structure
of special architectural or historic
interest that has statutory protection
due to its character or appearance.
Local Development Plan (LDP) –
provides the spatial planning strategy
for an area and the framework for
development management decision-
making.
Locality Place Plans – developed by
Community Planning, these plans will
develop a vision for a ‘place’, which will
inform how development,
infrastructure, service delivery and
funding should be targeted in a local
community, and will reflect the input
and aspirations of the local community.
This will change and be replaced by
Page 121

Page 122

Local Place Plans with the
implementation of the provisions of the
Planning (Scotland) Act 2019. 
Massing – The combined effect of the
arrangement, volume and shape of a
building or group of buildings.
Masterplan/Masterplanning –
describes and illustrates how a
proposal for the comprehensive
development of a specific site will meet
the vision for the site and how it will
work on the ground.
Material Consideration – A
consideration that must be taken into
account, where relevant, in a decision
on a planning application.
Mixed use – A mix of uses within a
building, on a site or within a particular
area. ‘Horizontal’ mixed uses are side
by side, usually in different buildings.
‘Vertical’ mixed uses are on different
floor of the same building. Places
which have a mix of uses are likely to
be lively at different times for different
reasons.
Open Space – includes all green
spaces and civic spaces which
contribute to the amenity of an area.
Passive Solar gain – The effect of the
sun’s heat on the temperature of a
building’s fabric and ambient indoor
temperatures, thus minimising heating
requirements in winter.
Passive Surveillance – The
discouragement to wrong-doing by the
presence of passers-by or the ability of
people to be seen out of surrounding
windows. Also known as Natural
surveillance (or supervision).
Passivhaus Standard – A commercial
accreditation for construction of “a
building, for which thermal comfort can
be achieved solely by post-heating or
post-cooling of the fresh air mass,
which is required to achieve sufficient
indoor air quality conditions – without
the need for additional recirculation of
air.” Alternative approaches to
achieving the environmental benefits of
this standard are available.
Path/Footpath – A highway on which
the public has a right of way on foot
only.
Pavement – 1 (UK) The raised surface
for pedestrians beside a street or road.
2 (US) The structure of a road,
including its surface and underlying
structure. 3 A paved surface.
Permeability – The degree to which
an area has a choice of routes through
it.
Place and Design Panel – works
collaboratively with developers,
architects, landowners and key
agencies to provide advice and
assistance in pre-application proposals
to help ensure projects contribute to a
culture of design excellence.
Place Standard Tool - provides a
simple framework to structure
conversations about place allowing you
to consider all the elements of a place
in a methodical way. 
Placemaking – Creating somewhere
with a distinct identity.
Page 122

Page 123

Pre-Application Service – Advice
from the Development Management
team on development proposals prior
to submission of a planning
application.
Primary route – A street upon which
more movement, variety and activity
takes place than on smaller
surrounding ones.
Private space – The parts of a village,
town or city to which public access is
restricted.
Processing Agreement - an agreed
framework for project management of
a planning application or related group
of applications.
Public space/realm – The parts of a
village, town or city (whether publicly or
privately owned) that are available,
without charge, for everyone to use or
see, including streets, squares and
parks.
Road – Any way (other than a
waterway) over which there is a public
right of passage (by whatever means)
and including the verge and any bridge
(whether permanent or temporary)
over which or any tunnel through
which, the way passes; includes
carriageway, cycleway and footway.
Roads Construction Consent – The
authority to construct a new road or an
extension of an existing road
irrespective of whether or not such
roads are to be submitted for adoption
as public granted by the Local Roads
Authority under Section 21 of the
Roads (Scotland) Act 1984.
Semi-private space – Space that may
be privately owned or managed but
into which the members of the public
may enter if they have a legitimate
reason, such as a front garden.
Service Strip – Reservation for
Statutory Undertaker services (gas,
water, etc) normally located within
confines of footway or verge.
Settlement pattern – The distinctive
way in which the roads, fields, paths
and buildings are laid out in a particular
place.
Shared Surface – Pedestrian priority
area shared with cycles and motor
vehicles.
Streetscape – The appearance of a
street; the street and all the elements
associated with it.
Streetscene – The roadways,
pavements, street furniture signage
and other elements that together
comprise the street environment.
Sunlight – Sunlight refers to direct
sunshine and is much brighter than
ambient daylight.
Sustainable Drainage Systems
(SuDS) – a sequence of water
management practices and facilities
designed to drain surface water more
sustainably than the conventional
practice of routing run-off through a
pipe to a watercourse.
Sustainable Development –
development which meets the needs of
the present without compromising the
ability of future generations to meet
their own needs.
Swale – A linear depression (often
beside a road) that allows rainwater to
soak away.
Page 123

Page 124

Topography – 1 A description or
representation of artificial or natural
features on or of the ground. 2
Mapping the shape of the land surface.
Town Centre – centre which provides
a diverse and sustainable mix of
activities and land uses which create
an identity that signals their function
and wider role.
Travel Plan – A travel plan aims to
promote sustainable travel choices (for
example, cycling) as an alternative to
single occupancy car journeys that
may impact negatively on the
environment, congestion and road
safety. Travel plans can be required
when granting planning permission for
new developments.
Tree Preservation Order (TPO) –
used to protect individual and groups
of trees and areas of woodland
considered important for amenity or
because of their cultural or historical
significance.
Unallocated/Visitor Parking Spaces
– Parking spaces which do not relate
directly to any particular dwellings and
are considered to be for the use of
either residents or visitors on a “first
come first served” basis.
Urban structure – The framework of
routes and spaces that connect locally
and more widely, and the way
developments, routes and open
spaces relate to one another.
Verge – Soft landscaped area adjacent
to the road.
Walkability – The ease with which it is
possible to walk around an area, from
one point to another or from housing to
facilities.
Page 124

Page 125

Useful Contacts
Architects Registration Board (ARB)
https://arb.org.uk/
Architecture and Design Scotland
www.ads.org.uk
Historic Environment Scotland (HES)
www.historicenvironment.scot
Scottish Environment Protection
Agency 
www.sepa.org.uk
NatureScot
www.nature.scot
Scottish Water 
www.scottishwater.co.uk
Transport Scotland 
www.transportscotland.gov.uk
Scottish Canals
https://www.scottishcanals.co.uk/
Royal Town Planning Institute
www.rtpi.org.uk
Royal Incorporation of Architects in
Scotland
www.rias.org.uk
Landscape Institute
www.landscapeinstitute.org
Institute of Conservation (ICON)
www.icon.org.uk
Institute of Historic Building
Conservation (IHBC)
www.ihbc.org.uk
Institution of Civil Engineers (ICE)
www.ice.org.uk
Royal Institution of Chartered
Surveyors (RICS)
www.rics.org/uk
Contact Us
Forward Planning
LDP@west-dunbarton.gov.uk
Development Management
DM@west-dunbarton.gov.uk
Placemaking Coordinator
Place&DesignPanel@west-
dunbarton.gov.uk
Page 125

Page 126

ITEM 7 - Appendix 4
Creating Places – comments received on draft version and Council’s proposed response
Respondent Comment WDC response
The Coal
Authority
It is noted….that this current consultation relates to a
draft SPG on Creating Places and I can confirm that
the Planning team at the Coal Authority have no
specific comments to make on this document.
It is noted that the Coal Authority has no specific
comments on this document.
It may however be worth noting that if SUDS are
proposed as part of developments green
infrastructure consideration will need to be given by
the developer to the implications of this in relation to
the stability and public safety risks posed by coal
mining legacy.  The developer should seek their own
advice from a technically competent person to ensure
that a proper assessment has been made of the
potential interaction between hydrology, the proposed
drainage system and ground stability, including the
implications this may have for any mine workings
which may be present beneath the site.
This comment was received in relation to the Green
Infrastructure and Green Network Supplementary
Guidance, it is considered more relevant for inclusion
within the Creating Places Supplementary Guidance.
Changes have been made in this regard (page 20).
Historic
Environment
Scotland
It is considered the drafts for our historic environment
interests have no comments on their content.
It is noted that Historic Environment Scotland has no
specific comments on this document.
Homes for
Scotland
Introduction
Homes for Scotland (HFS) welcomes the opportunity
to comment on West Dunbartonshire’s Draft
Supplementary Guidance (SG) in relation to Creating
Places.
Noted
Page 126

Page 127

It is stated within this Guidance that it is intended that
“this guidance will be adopted as statutory
supplementary guidance, forming part of Local
Development Plan 2”. Given Local Development Plan
2 (LDP2) has not yet been adopted, and therefore its
final form is not currently known, it is problematic to
be publishing SG to support this. It is not even known
whether LDP2 will in fact ever be adopted. 
LDP2 does not currently form part of the
Development Plan, as it remains unadopted.
Therefore, the lower tier of the Development Plan in
West Dunbartonshire is the West Dunbartonshire
Local Plan (WDLP), adopted in March 2010. The
status of this Plan has been significantly eroded, as it
is now over 7 years out of date.
This draft SG refers to National Planning Framework
4 (NPF4), the final version of which is due to be
published in autumn 2022. The draft SG has also
been released just ahead of the anticipated new
Development Management Regulations. For all of
these reasons it could be argued that the revision and
delivery of new SG is premature.
As noted above, it is stated that the Council intends to
adopt the proposed new SG as part of the statutory
Development Plan. However, this statutory status
might only last for a limited period as all such
guidance will at some point have to be non-statutory
under the soon to be published new Regulations and
NPF4. While it is acknowledged that Scottish
The status of the Supplementary Guidance has been
clarified within the document. The guidance is
intended to be adopted as supplementary guidance to
the Local Development Plan (LDP2) and provides
further detailed guidance on the content thereof, it is
therefore not premature in relation to the emerging
National Planning Framework or Development
Planning Regulations, as the LDP has been prepared
and will be adopted based on the current Scottish
Planning Policy, and the current Development
Planning Regulations and in line with transitional
arrangements. It is agreed that the content of the
emerging National Planning Framework 4 cannot be
assumed, and the references to this have been
amended. (Page 5)
The guidance on transitional arrangements indicates
that Planning Authorities will require to decide if the
content of Supplementary Guidance should move to
planning guidance or be included within local
development plan itself. However the guidance also
indicates that new supplementary guidance can be
prepared and adopted until section 22 of the 1997 Act
is repealed and for a further 24 month period
thereafter.
Page 127

Page 128

Ministers have made provision for a 24 month
‘transitional period’ following publication of the new
Regulations, the draft new SG could end up being
part of the adopted development plan for a limited
period after which the council will require to undertake
a further revision to reflect the non-statutory status
thereafter.
As we don’t yet know what the new Regulations will
look like and how the transitional period will be
implemented, HFS is of the view that the Council
should consider moving straight to publication of non-
statutory SGs as other Local Authorities, including
South Lanarkshire Council, have done.
Regardless, the draft Guidance, in places, appears to
go beyond merely supplementing policies within the
LDP but rather looks to introduce new and more
onerous requirements for developments to meet. This
is not an appropriate use of SG as the principles of
policy have not been properly scrutinised or tested as
part of the LDP examination.
Planning Circular 6/2013 (Development Planning)
notes that Regulation 27 (2) of The Town and Country
Planning (Development Planning) (Scotland)
Regulations 2008 requires SG to be limited to the
provision of further information or detail in respect of
policies or proposals set out in the SDP or LDP.
There must be a sufficient “hook‟ in the SDP or LDP
policies or proposals to hang the SG on, to give it
statutory weight.
The Council considers that LDP2 provides sufficient
‘hooks’ for the Creating Places Supplementary
Guidance. The Supplementary Guidance is
referenced 5 times in LDP2 in both policies and
explanatory text. The Supplementary Guidance
serves the purpose of providing further information or
detail in respect of policies set out in LDP2.
Page 128

Page 129

This matter was reinforced by a letter sent to All
Heads of Planning on 15 January 2015 by The Chief
Planner, which states:
“For supplementary guidance to be issued in
connection with a local development plan, this means
that the guidance may only deal with the provision of
further information or detail in respect of policies or
proposals set out in the local development plan and
then only provided those are matters which are
expressly identified in a statement contained in the
plan as matters which are to be dealt with in
supplementary guidance.”
Specific sections of the draft SG breach these
requirements, as detailed below. 
Any mechanism which may seek to restrict the
deliverability of new homes to meet the housing crisis
which prevails in Scotland must be resisted. As we
move towards the new system under NPF4, the
threshold for what constitutes a “deliverable” site is
greater than previously existed, and it is against this
backdrop that all policies/strategies must now sit.
Affecting the deliverability of sites through the
introduction and requirement of a range of additional
asks must be seriously considered.
The Scottish Government have indicated in the draft
NPF4 that the Climate and Nature Crises should be
given the highest priority when considering planning
issues. While it is acknowledged  that the final NPF
has yet to be published, the Planning Authority
recognises that the Climate Crisis, Nature Crisis and
Housing Crisis are all part of the range of issues
which are considered when preparing policy and
guidance and it sits with the Planning Authority to
afford appropriate weight to these and all other
relevant considerations.
The Provision of Land or Buildings for Neighbourhood
Services
The Local Development Plan sets out the aspiration
for the creation of walkable places and gives support
for ancillary and compatible land uses within
communities under Policy SC5 Ancillary Retail Uses.
Page 129

Page 130

Page 25 of the draft SG refers to the provision of land
or buildings for neighbourhood services where they
are not within a 10-minute walk. This is extremely
vague and open to interpretation. Further clarification
is required here with regards to the definition of
“neighbourhood services”. Furthermore, the scale of
land/buildings that may be required to be set aside
needs to be made clear. It is also vital that viability
factors are considered when assessing whether these
land/buildings are required, and any wording
associated with this policy requires to be suitably
flexible.
In terms of neighbourhood facilities, this should not
fall solely on the home building sector to deliver
these.
The Supplementary Guidance indicates a mechanism
how this can be achieved within housing
developments rather than introducing a new policy
requirement. A change has been made to provide
some flexibility, by indicating that this should be
considered, rather than “expected”. Further
clarification of 10 minute walking distance as 800m
has been provided and that this relates to the small
ancillary and compatible uses such as shops,
nurseries or leisure facilities as indicated in the
preceding paragraph (page 28).
Sustainable Construction
This section states:
“The design of the building should aim to enhance
energy efficiency through solar orientation; passive
heating, cooling and ventilation; as well as, choice of
materials and other such strategies to improve energy
efficiency.”
As a sector, home building is very well placed to
respond to and address the climate challenge.
Building regulations ensure that new homes are
extremely efficient with the incorporation of
The guidance provides a supportive framework for
developer who wish to go beyond the minimum
required by Building Standards. It therefore
encourages development which achieves Silver or
Gold aspect of the building standards, as well as a
fabric first approach which reduces the need for
energy generation before seeking to offset the energy
requirements with renewable technology.
Page 130

Page 131

improvements to the building fabric and low carbon
technologies including PV panels and heat pumps.
HFS supports the strategy of heat networks and there
will be occasions when viability and timing could allow
for their integration within new housing developments.
However, it needs to be part of a flexible approach
with an understanding of commercial, practical and
viable constraints with regards to connection to heat
networks. In addition, it is essential that this policy is
entirely aligned with Building Standards Regulations.
This policy needs to be clearer on what is intended to
be achieved by its inclusion in a planning document
when heat is already governed by Building
Regulations.
Heat networks can only be connected to where they
already exist, or can only be created for larger
developments, where scale and viability allows.
The design code should not be prescriptive and the
Council should not dictate housing mix at the expense
of viability. If large, flagship brownfield sites are to
come forward (which underpin the Council’s land
supply) then the Council should be flexible with
regards to mix and design codes.
The guidance only requires connection to a heat
network where one exists; clarification is provided that
development should be made heat network ready
where a network is planned for that area (page 33).
The guidance does not dictate housing mix, but does
indicate that typology can have an impact on energy
efficiency, giving support for more sustainable forms.
The Queens Quay Design Codes have been
previously consulted on and adopted. The preparation
of form-based guidance such as design codes, which
may include denser development or information on
building heights, is supported by Scottish Planning
Policy point 57, Tools for Making Better Places, as a
way to deliver the six qualities of successful places.
No change is required.
NatureScot NatureScotnote that ‘this guide seeks to ensure that
new development recognises and responds to West
Dunbartonshire’s unique location, making the most of
the waterfront and connecting into the outstanding
green network opportunities provided by its setting’.
The comments and notes of support from NatureScot
are welcomed.
Page 131

Page 132

They broadly support and welcome the content of this
Guidance and in particular, the emphasis given to a
design led and green infrastructure first approach to
placemaking. Also, and as part of that design led
approach, the value attributed to the need for a
thorough appraisal of development sites and analysis
of their context to be undertaken as prerequisite to
delivery of high quality development.
It is  acknowledged the focus given to the role of
collaboration in ensuring that proposals contribute to
the creation of successful and sustainable places, the
encouragement given to developers to engage with
the community and with the Council’s Pre-Application
Service to help inform development proposals,
including for example, the need for specific studies or
requirements and the role of the Place and Design
Panel, in ensuring that new development contributes
to outstanding places and design in West
Dunbartonshire.
Green Infrastructure (pages 19 -24)
Support the value given to the green network in
placemaking and the expectation that new
development will contribute positively to this through
the ‘green infrastructure first approach’. Also, for
green infrastructure solutions for the delivery of on-
site water management; biodiversity; access networks
and open space, with the layering of these functions
contributing to a multifunctional green network, with
Page 132

Page 133

multiple benefits for health, well-being, wildlife as well
as climate change mitigation and adaptation.
Habitat Enhancement (page 21)
They  welcome the measures to address habitat
enhancement and that: ‘Existing habitats should be
retained and enhanced by providing links to wider
greenspaces or riparian corridors to address habitat
fragmentation’. Similarly,  welcome the utilisation of
naturalised SUDS, designed to create opportunities to
enhance and expand wetland habitats and create
other habitats for biodiversity.
Overall, they consider the document to be clearly
presented providing useful, detailed information and
clarity to assist those involved in the design and
placemaking process.
RSPB
Scotland
1. Recommend that reference be made to the
upcoming NatureScot guidance ‘Developing With
Nature.’
Page 21 Habitat Enhancement
1. A reference to this emerging guidance has been
included. (page 21)
2. The Guidance should mention opportunities to
incorporate biodiversity features within the buildings
themselves. These could include:
- Nesting and Roosting boxes for building reliant birds
(e.g. swift, swallow and house martin) and bats and
birds associated with urban areas (e.g. house
sparrow and starling);
2. Reference to biodiversity features within buildings
has been included (page 23).
Page 133

Page 134

- Green roofs
3. The Guidance should recommend the use of
wildlife-friendly lighting.
3. Reference to wildlife-friendly lighting has been
included (page 23).
4. Whilst specimen trees are important, it is more
important for wildlife to have a varied structure of
vegetation. It is  recommended that the following
wording be incorporated:
Replace:
“Planting should mostly be appropriate native species
with any non‐native species selected to provide food
and shelter for wildlife.” 
With
‘Planting should mostly be appropriate native species
and seek to create a varied structure of wildlife
friendly trees, shrubs and flower rich meadows
providing food, shelter and breeding places for
wildlife.’
4. This change has been made (page 23).
Scottish
Government
At page 21 – Habitat Enhancement: Second
paragraph, delete “The site” at start of sentence.
This change has been made (page 23).
Scottish
Environmental
Protection
Agency
(SEPA) 
Support the commitment to a green infrastructure
first approach to development. Also welcome the
measures therein to safeguard, enhance and expand
existing networks and the connections between them
and support multi-functionality (e.g. by integrating
water management measures such as SuDS).
It is noted that Scottish Environmental Protection
Agency has not specific comments on this document
and the support for the green infrastructure first
approach as well as the measures to safeguard,
enhance and expand existing networks are
welcomed.
Page 134

Page 135

Strathclyde
partnership for
Transport
No comments Noted
Local resident Benefits of green networks and green infrastructure
The following are listed as a benefit:
• Off road active travel and recreation routes
• Locations for sport and recreation
It goes on to say they are made more valuable when
they are multi functional and connected providing off
road routes 
This should be expanded to include reference to
horse related activities and access – not all sport and
recreation is football, walking or cycling.
Horse riding is much more inclusive than many sports
as men and women compete on equal terms and
together, age and ability is no barrier either. Horses
can allow freedom of movement to those who cannot
have this on their own and horse riding makes places
more accessible than with wheelchairs.
This comment was received in relation to the Green
Infrastructure and Green Network Supplementary
Guidance, it is considered more relevant for inclusion
within the Creating Places Supplementary Guidance.
A reference to horseriding has been added to the
Access Networks section of the guidance (page 24),
however it is considered unreasonable to have a
general requirement for housing development to
deliver bridleways.
When paths are for multi users thought should be
given to all potential users and suitable surfaces
installed, designated bridleways could be installed -
these could be side by side with a “horse lane” or
suitable parking provided for horseboxes. Less use of
steps to allow better access for horses 
This comment was received in relation to the Green
Infrastructure and Green Network Supplementary
Guidance, it is considered more relevant for inclusion
within the Creating Places Supplementary Guidance.
A reference to ensuring multi-use paths are suitable
for all users is added to the Access Networks section
of the guidance (page 24).
Page 135

Page 136

On a wider note  developers need to stop cutting 
down the mature trees on site and replacing them
with tiny saplings, this doesn’t help with climate
change in any way and happens all the time. In one
example a block of flats  opposite me over 300 trees
were cut down and they have been replaced with
small shrubs about 10 of them. These trees were all
mature with many in excess of 50 yrs old. This must
be stopped, developers can keep existing trees
around boundaries which makes the whole site nicer
for residents and better for wildlife but time and time
again everything is cleared and a blank site is the
starting point. The keeping of mature trees must be
enforced even the ones which seemingly are not in
best of health, even an unhealthy tree can live for
hundreds of yrs. There are 2 ancient willows on my
rented field and both grow almost horizontally, they
are still alive, no danger of falling over and are a
beautiful feature. 
Existing trees onsite must be kept and developers
must adhere to this. Climate change is important so
take actions to prevent it worsening.
This comment was received in relation to the Green
Infrastructure and Green Network Supplementary
Guidance, it is considered more relevant to the
Creating Places Supplementary Guidance. 
Policy ENV4 Forestry, Trees and Woodland gives
significant protection to “long established woodland;
woodlands of high conservation value (including
categories 1b, 2b and 3 on SNH Ancient Woodlands
Inventory and woodlands identified in Forestry
Commission Native Woodland Survey of Scotland);
and those area covered by a provisional or confirmed
tree preservation order.” The Supplementary
Guidance cannot extend this protection to individual
trees, however it does seek to encourage
preservation of trees where they contribute positively
to the character of an area (page 14). No change
required.
Balconies are not an acceptable outdoor space,
gardens should be compulsory on all developments
even if it means less buildings on site (no bad thing).
Who uses their balconies, I mean the ones on the
main road in clydebank face on to a busy road, who is
going to sit out there with all the fumes from the road.
Gardens are a must not unusable balconies. Do
remember that this council has covered in most of
these balconies in recent years for safety reasons so
In some locations, for example town centres, higher
density proposals are supported and a more flexible
approach to open space may be necessary. A
balcony can provide an outdoor sitting space, a
private space for drying or growing plants in addition
to any shared, communal or public spaces associated
with a development. Clarification about these uses, is
provided within the guidance (Page 27).
Page 136

Page 137

don’t start putting them in again instead of actual
gardens.
WDC Roads This document echoes much of what already exists in
the National Roads Development Guide (NRDG) and
Designing Streets. Clarification is required around
parking provision though. On P17, it is stated that
parking would be outwith the front garden. Roads
Services’ preferred default is for parking to be located
within the curtilage of any residential plot (at the side
would possibly satisfy both concerns?). 
The guidance encourages a variety of different
parking arrangements in line with National Policy,
Designing Streets, while expressing a preference for
parking between gables when on-plot parking is
required rather than using front gardens.  The
guidance covers a range of different housing types,
including flats and houses; so flexibility is given to
allow parking arrangements to be designed in a way
that is most suitable for the type of housing and
character of the street to be formed. No change is
required.
Another concern is the level of parking provision: The
document states that developers should be
encouraged to reduce parking provision. Parking
provision should be appropriate to the size, type and
location of each development. Flexibility is already
afforded by way of step-down for social and
affordable housing, justification of reduction through
Transportation Assessments and future allocation /
developer contributions, where parking is initially
provided at a lower rate than as per WDC Parking
Standards. This topic is even more relevant, given the
feedback and instructions from the Planning
Committee following a submission with inadequate
parking provision at Mill Road, Clydebank in 2021.
The guidance indicates that “a reduction of the
Council’s parking standard will be encouraged for
sites which are in accessible or town centre locations
and close to public transport hubs.” It is agreed that
parking provision should be appropriate to the size
type and location of the development, but the
guidance seeks to be specific about the types of
location for which a reduction will be supported. It is
acknowledged that this should be evidenced within a
Transport Assessment and the guidance has been
amended to indicate this (page 18).
Page 137

Page 138

Local Development Plan 2
Green Network and Green Infrastructure Supplementary Guidance
November 2022
ITEM 7 - APPENDIX 5
Page 138

Page 139

Status of this document
This document has been prepared as Supplementary
Guidance to the Local Development Plan (LDP2). It is a
material consideration in planning decisions, and will be
adopted as part of the development plan following the
adoption of LDP2.
This document is also available in other languages, large print
and audio format on request. Please contact Corporate
Communications at:
Address: West Dunbartonshire Council, Council Offices, 16
Church Street Dumbarton, G82 1QL 
Phone: 01389 737527 
Email: Communications@west-dunbarton.gov.uk
Arabic
Hindi
Punjabi
Urdu
Chinese (Cantonese)
Polish
British Sign Language
BSL users can contact us via contactSCOTLAND-BSL, the
on-line British Sign Language interpreting service. 
Find out more on the contactSCOTLAND website .
Page 139

Page 140

Contents
Part 1 - West Dunbartonshire’s green network and green infrastructure .................... 3
Introduction ............................................................................................................. 3
What is open space ............................................................................................. 3
What is greenspace? ........................................................................................... 3
What is green infrastructure? ............................................................................... 4
What is a green network? .................................................................................... 4
What are the benefits of green networks and green infrastructure? .................... 4
Planning and the green network and green infrastructure ...................................... 5
Safeguarding the green network and green infrastructure ...................................... 6
Enhancing and expanding the green network ......................................................... 7
Part 2 – Green infrastructure delivery in new development ........................................ 8
Embedding the green network and green infrastructure ......................................... 8
Green infrastructure functions ................................................................................. 8
Green infrastructure function: water management ............................................... 9
Green infrastructure function: habitat enhancement ............................................ 9
Green infrastructure function: access networks ................................................... 9
Green infrastructure function: open space ........................................................... 9
The requirement for green infrastructure in different types of development .......... 10
Part 3 – Open space in new residential development .............................................. 12
Open space standards for residential development .............................................. 12
Accessibility standard ........................................................................................ 12
Quality standard ................................................................................................. 12
Quantity standard .............................................................................................. 13
How will these standards be used? ....................................................................... 14
On‐site provision for residential developments ..................................................... 15
Green infrastructure stewardship .......................................................................... 15
Part 4 – Developer contributions and green infrastructure projects .......................... 16
Legal and policy framework .................................................................................. 16
Developer contribution framework ........................................................................ 16
When will contributions be sought? ................................................................... 16
What will the contribution be? ............................................................................ 16
Page 140

Page 141

2
How is the contribution calculated? ................................................................... 17
When will developer contributions be required to be paid? ................................ 18
Financial mechanisms ....................................................................................... 18
What projects will developer contributions be spent on? ................................... 18
Are there any circumstances when developer contributions will be reduced? ... 18
Monitoring ............................................................................................................. 19
Appendix 1: Developer’s flowchart ........................................................................... 20
Appendix 2: Green infrastructure checklist ............................................................... 21
Appendix 3: Developer contributions examples ....................................................... 22
Example 1 - using the quantity standard ............................................................... 22
Example 2 - using the quantity standard for small sites ........................................ 24
Example 3 - accessibility standard: on‐site provision or financial contribution ...... 26
Example 4 - using the quantity standard for large sites ........................................ 28
Example 5 - not all of the site is accessible........................................................... 31
Example 6 - looking at quality standards .............................................................. 33
Appendix 4: Information required to be provided in development appraisals ........... 35
Appendix 5: Open Space Audit information note ...................................................... 37
Page 141

Page 142

Part 1 - West Dunbartonshire’s green network and green
infrastructure
Introduction
West Dunbartonshire has an outstanding natural environment, which has been
shaped by the area’s history, and defines West Dunbartonshire as a place today.
This environment is vital to future prosperity and the health and wellbeing of West
Dunbartonshire. The area boasts a wide variety of parks and gardens; play spaces
and sports areas; woodland; natural and semi‐natural green spaces; riverside and
canalside spaces; as well as the designed landscape at Overtoun House and
outstanding countryside such as the Kilpatrick Hills and the Muirs, which together
form a valuable and important green network.
The strategy of Local Development Plan 2 seeks to safeguard the existing green
network, and to ensure new development enhances and expands it by improving
existing green infrastructure assets, the connections between them and by creating
new multifunctional green infrastructure. As a result, the Local Development Plan
has been awarded the Building with Nature Award, which means that: 
1. the policies within the Plan ensure that green infrastructure is considered from
the outset of the development process, throughout its construction, and is
sustainably managed after the development has been completed; and
2. it demonstrates a whole lifecycle approach to green infrastructure which will
ensure development that comes forward delivers healthy, liveable and
sustainable communities within West Dunbartonshire.
The purpose of this Supplementary Guidance is to:
1. define the green network in West Dunbartonshire and identify its existing
assets and opportunities (Part 1);
2. outline the principles for embedding green infrastructure at the heart of new
development using a green infrastructure first approach (Part 2);
3. define the open space standards that will be required of new development
and how these standards will be achieved (Part 3); and
4. describe how developer contributions for green infrastructure associated with
new developments will be calculated (Part 4).
What is open space
Open space is space within and on the edge of settlements comprising green space
and civic areas such as squares, market places and other paved or hard landscaped
areas with a civic function.
What is greenspace?
Greenspace is space which provides a recreational function, an amenity function, or
aesthetic value to the public such as areas of: grass, trees, other vegetation, water,
but not including agricultural or horticultural land.
Page 142

Page 143

What is green infrastructure?
Green infrastructure is features or spaces within the natural and built environments
that provide a range of ecosystem services.
What is a green network?
The green network is connected areas of green infrastructure and open space that
together form an integrated and multi-functional network.
GREEN NETWORKS
are connected areas of
green infrastructure that
together form an
integrated and multi-
functional network.
GREENSPACE
is space which
provides a
recreational function,
an amenity function,
or aesthetic value to
the public such as
areas of: grass, trees,
other vegetation,
water, but not
including agricultural
or horticultural land.
+ CONNECTION
+ INTEGRATION
+ MULTI-
FUNCTIONALITY
GREEN
INFRASTRUCTURE
Features or spaces
within the natural and
built environments
that provide a
range of ecosystem
services.
+ DESIGN
+ MANAGEMENT
+ FUNCTIONALITY
Figure 1  The relationship between greenspace, green infrastructure and the green network
What are the benefits of green networks and green infrastructure?
Green networks and green infrastructure can provide a range of beneficial outcomes,
including economic; environmental; climatic; mental and physical health; and social
improvements.
Greenspace, green infrastructure and the green network have a number of benefits:
GREENSPACE
is any vegetated land
or structure, water,
path or geological
feature within and
on the edges of
settlements.
+DESIGN
+MANAGEMENT
+FUNCTIONALITY
GREEN
INFRASTRUCTURE
is greenspace which
is designed and/or
managed to provide
identified functions.
+CONNECTION
+INTEGRATION
+MULTI-
FUNCTIONALITY
GREEN NETWORKS
are connected areas
of green
infrastructure that
together form an
integrated and multi-
functional network.
Page 143

Page 144

• habitats for biodiversity;
• off-road active travel and recreation routes;
• locations for sport and recreation;
• areas for the management of water; and
• defining distinctive, healthy, sustainable and attractive places in which to
live, work, visit and enjoy.
The Scottish Government’s Green Infrastructure: Design and Placemaking (2011)
provides more detail on the benefits that green networks and green infrastructure
can have as well as how green infrastructure can deliver the six qualities of
successful places; welcoming, distinctive, safe and pleasant, easy to move around,
resource efficient and adaptable.1 
These assets become more valuable when they are designed and managed to be:
• multi‐‐‐‐functional, thereby delivering more than one benefit;
• integrated into where people live and other urban infrastructure; and
• connected to other areas of green infrastructure, thereby providing off-road
routes for people and habitat corridors for wildlife to move around.
Planning and the green network and green infrastructure
The planning system is a key mechanism for delivering the green network, and the
green network can help deliver the outcomes, particularly with regard to improving
health and wellbeing, meeting climate change targets, placemaking and securing
positive effects for biodiversity.
Local Development Plan 2 establishes a strategy and policies for the protection,
enhancement and expansion of the green network and green infrastructure. The
strategy of the Plan seeks to safeguard and where possible ensure that development
enhances and expands both of these important resources.
Local Development Plan 2 identifies the Strategic Green Network as a Key Asset
that the Council wants to see protected and enhanced. The key corridors and assets
which make up the Strategic Green Network are highlighted in the Local
Development Plan 2 Strategic Green Network Map.  Strategic Green Network
Projects that are considered necessary in order to strengthen West Dunbartonshire’s
contribution to the Central Scotland Green Network are identified on the Strategic
Green Network Projects map, Figure 2. This illustrates how West Dunbartonshire’s
green network will: be integrated through the urban areas of the Vale of Leven
corridor and the Clyde Waterfront; provide connections for people to the Kilpatrick
and Carman Hills; span the Vale of Leven to provide wildlife corridors.
1 http://www.gov.scot/Publications/2011/11/04140525/5
Page 144

Page 145

Figure 2.  A spatial strategy for West Dunbartonshire’s green network
The Local Development Plan 2 strategy for the green network is to (1) safeguard the
existing green network; and (2) ensure new development enhances and expands the
green network by creating new multifunctional green and open spaces, and
improving existing green network assets and the connections between them.
Safeguarding the green network and green infrastructure 
Local Development Plan 2 seeks to safeguard the green network through a series of
Policies, as detailed below:
1. Policy KH 1 seeks to protect and enhance the Kilpatrick Hills Local Landscape
Area;
2. Policy GI1 seeks to ensure that safeguarded open space and outdoor sports
facilities are protected;
3. Policy ENV 1 seeks to conserve, protect and where appropriate, enhance,
European and National designated sites;
4. Policy ENV 2 seeks to protect the landscape character of West
Dunbartonshire;
5. Policy ENV 3 protecting carbon rich soils through the area;
6. Policy ENV 4 protects Forestry, Trees and Woodlands;
7. Policy ENV 5 seeks to protect and, where appropriate, enhance the water
environment;
8. Policy ENV 6 seeks to avoid development on floodplains and to ensure that
flood risk is avoided elsewhere; and
9. Policy CON 3 protects Core Paths and Natural Routes.
Page 145

Page 146

Enhancing and expanding the green network
Local Development Plan 2 seeks to enhance and expand the green network through
the following policies:
1. Policy CP1 seeks to ensure new development creates successful, sustainable
places
2. Policy CP2 requires developments to deliver green infrastructure that
contributes to the development and enhancement of a multi-functional green
network
3. Policy GI2 which requires new developments to meet open space standards.
4. Policy GI3 which encourages the provision of allotments and community
gardens
5. Policy GI4 which establishes a framework for the provision of developer
contributions towards green infrastructure.
Page 146

Page 147

Part 2 – Green infrastructure delivery in new development
Embedding the green network and green infrastructure
In order to safeguard, enhance and expand the green network and green
infrastructure, development proposals are required to:
1. Protect the existing green network: Green infrastructure and open spaces
which currently exist on a site should be protected unless there is adequate
mitigation which enhances the quality of the network elsewhere providing an
overall net gain in quantitative or qualitative provision.
2. Understand the wider green network: It is vital that development proposals
look beyond the boundaries of individual sites, however large or small, to
consider the broader spatial context and create a more coordinated and
joined-up network.
3. Integrate green infrastructure into the design process for all
development proposals: The greatest green network benefits can be
achieved if green infrastructure is considered integral to the development
design process and considered early, rather than an afterthought once other
elements have become ‘fixed’.
4. Create new green infrastructure as part of the development: Where
development increases the number of people who would use and derive
benefit from the green network, proposals should seek to extend the network
through the creation of new green and open spaces which have designed
functions for a range of users.
5. Enhance the functionality and biodiversity value of existing assets: The
site appraisal and design process should identify opportunities to enhance the
value of existing assets.
6. Link to the existing network: Green infrastructure and path connections on
new sites should link up with the existing green network where possible.
7. Contribute financially towards off‐ff‐ff‐ff‐site projects:  In some instances the
best way of achieving green network enhancement will be by making a
financial contribution to projects beyond a site’s boundary, for example
upgrading a local play park or path network. Part 4 outlines the circumstance
and level of contribution that may be required.
8. Look long-term towards future management and maintenance.  How
green infrastructure and open spaces will be sustained should be considered
from the outset. Without careful consideration being given to future
management and maintenance of assets the range of benefits will reduce
quickly over time.
Green infrastructure functions
Policy CP 2 of Local Development Plan 2 sets out how the different functions of
green infrastructure should be integrated within developments. These functions are
water management, habitat enhancement, access and open space. The integration
of these functions within the design and layout of the development is necessary in
order to ensure that the development ensures a whole life approach to green
Page 147

Page 148

infrastructure provision and links into and contributes to the wider green network.
Taking a green infrastructure first approach to integrating these functions within the
development, will help to create a sustainable, well managed and healthy,
biodiversity rich, green place, which helps to contribute to fit and active communities. 
Green infrastructure function: water management 
The Water Environment (Controlled Activities) (Scotland) Regulations 2011 requires
all surface water from new development to be treated by a sustainable drainage
system (SuDS) before it is discharged into the water environment, except for single
houses or where the discharge will be into coastal water.
SuDS help to protect water quality and reduce potential for flood risk by facilitating
natural drainage of surface water run‐off (including roof water). They encourage
infiltration and attenuation to prevent and reduce pollution from diffuse urban
sources and release capacity in water management infrastructure. 
However, not all SuDS systems deliver a range of multiple benefits as envisaged by
the Integrated Green Infrastructure (IGI) approach.  SuDS should be designed and
constructed to be multi‐functional green infrastructure elements, providing visual
interest, recreational amenity and biodiversity value.
Green infrastructure function: habitat enhancement
Many sites will have opportunities to create/enhance habitats and habitat nature
networks, create connections between those habitats and networks or enhance the
biodiversity of the site through specific planting and design. 
Proposals for new development should must consider whether the site can protect or
enhance habitats to safeguard existing networks or deliver new habitat to connect
fragmented networks. This work should be informed by appropriate surveys and
assessment. guided by tThe Green Network Blueprint developed by the Glasgow
and Clyde Valley Green Network Partnership can provide strategic guidance on,
which details existing habitats critical to the wider network and where connections
should be made to improve habitat connectivity.
Green infrastructure function: access networks
A successful green network needs to have good multi-user connections between
the different open spaces and facilities, such as shops and schools, which exist in and
around our settlements. New development has a role to play in this by ensuring that
sites connect to the existing green network.
When appraising the access potential for a site, consideration should be given to what
opportunities exist within the site, including how houses will link with open space and
facilities using safe, off-road Green Active Travel routes, and what opportunities exist
to provide multi-use connections with existing access networks outwith the site.
Proposals for new development should consider whether the site can protect or
enhance existing assets or deliver new Green Active Travel infrastructure to address
identified gaps.
Green infrastructure function: open space
This is covered in greater detail in Part 3.
Page 148

Page 149

The requirement for green infrastructure in different types of
development
Not all forms of development will have to contribute directly or indirectly to open
space provision.  The level of contribution expected will be proportionate to the scale
and impact of that development on the green network.  Developments with the
greatest impact are those that increase user demands on the green network i.e.
residential uses.  Table 1 sets out these requirements and there is a flow chart in
Appendix 1 which provides a quick guide to the expectations for provision of open
space.
Residential development
(units)
New commercial or
industrial
development
TYPES OF
PROVISION
1-9 10-49 50+
Layout to include
landscaping and
setting
   
Green and Open
Spaces incl. play
spaces and
equipped areas
   
Access Networks
e.g. walkable link to
green network
   
Water Management
e.g. SUDS
   
Habitat
NetworksProvision/
Enhancement
e.g. biodiversity
   
Off-site
contribution/delivery
   
 not required
 required where need/opportunity identified
 required
Table 1 Matrix of types of development and indicative green infrastructure
requirements
New build commercial and industrial developments should comply with the principles
of good design set out in Policies CP1 and CP 2 of Local Development Plan 2 and
the Creating Places Supplementary Guidance, and look for opportunities to provide
amenity space, access links, SUDS and enhance biodiversity through planting.
Page 149

Page 150

All residential development is expected to enhance the green network and applicants
should fully explore all opportunities for doing so at the outset of masterplanning and
site design. The requirements for green infrastructure associated with residential
development are based on an assessment of need and opportunity using the
estimated population size of the development and the standards of accessibility,
quality and quantity. The green network requirements for each individual site will be
discussed and agreed at pre‐ application stage.
Design guidance for integrating green infrastructure into new development is set out
in the Creating Places Supplementary Guidance.
Appendix 2 provides a checklist for ensuring the principles and functions set out
above have been considered within development proposals.
Page 150

Page 151

Part 3 – Open space in new residential development
Open space standards for residential development
In order to create a valued green network within West Dunbartonshire each
component of the green network has to be “fit for purpose”, in other words, it is in a
condition that can support its intended purpose and function.  Three key standards
are used to determine whether a component is “fit for purpose”. These are
1. Accessibility
2. Quality; and
3. Quantity
These standards will be used to:
1. inform developers what the minimum requirements are for their sites;
2. prioritise works to provide/enhance facilities;
3. identify areas where open spaces are not fit for purpose; and
4. identify where there is a deficit in provision
Accessibility standard
This is the principle standard and sets a threshold for how close people should live to
their nearest publicly usable open space. The Council is keen to ensure that the
distance to open spaces takes into account the walking abilities of children and older
people. It is assumed that a child would be able to walk 250m in approximately 5
minutes and this distance defines the standard. The priority is to ensure that people
have easy access to multi‐purpose and good quality spaces that meet their needs.
The accessibility standard is:
When carrying out a site appraisal, developers should assess the distance of usable,
good quality open space, including the type, relative to the site being considered,
and this assessment should be provided in plan form. The distances should not be
“as the crow flies” but based on a network analysis using streets, paths and access
points to open spaces and highlighting barriers to those spaces. 
This assessment will inform what type of space, if any, is required within the
development, and its preferred location, or if a financial contribution to an existing
space is more appropriate.
Small, single use spaces such as stand-alone play areas should not be considered
as part of this assessment.
Quality standard
The quality of an open space is an assessment‐derived score based on work
undertaken as part of the Open Space Audit carried out in 2016 and updated in 2018
Everyone will live within a 250m walk of a 0.2ha usable
and good quality greenspace which meets the quality
standard
Page 151

Page 152

to reflect changes to some spaces (see Appendix 5). It measures the quality of
spaces against a set of criteria relating to the site’s management, usability,
biodiversity, accessibility and infrastructure.  The quality measure has two main
uses: 
1. to identify where investment is needed in existing spaces
2. to ensure that new spaces meet/exceed the quality standard.
The quality standard is:
Where a space is identified as being below the Threshold Score, this indicates the
quality of that space is below standard and requires investment, and cannot in its
current condition count towards open space provision for the development site. All
new provision should exceed the threshold scores in Table 2 and should have
management and maintenance mechanisms and funding in place to ensure that the
quality is maintained into the future. The quality assessment for existing spaces will
be used to inform what enhancements are required if it falls below the threshold.
Open space typology Quality standard
threshold score
Parks and gardens 69%
Residential amenity greenspace 60%
Natural/semi-natural greenspaces 55%
Play space 50%
Table 2 - Quality standards for greenspace types
Quantity standard
The quantity standard is the amount of open space required per person. For West
Dunbartonshire the standard for new developments is as follows: 
Development sites should provide this quantity of open space as a minimum where
the accessibility standard and quality standard identifies a need based on an
analysis of open space provision for the wider area.  The range and mix of open
space within a development should reflect the findings of the site and wider context
appraisal, but would normally include formal open space such as a park, multi-
All publicly usable open spaces should meet or exceed the
threshold score set out in Table 2
Following reference to the accessibility and quality standard, where
provision is required,All new housing developments should provide
access to 30m2 of publicly useable open space per person.
Page 152

Page 153

functional amenity greenspace, formal and informal play space, natural/semi‐natural
greenspace and green corridors. Incidental greenspace and landscaping will not
count to towards the quantity standard. Developers should provide a site plan
indicating which spaces comprise provision of open space. Play areas must include
accessible play equipment so that they may be enjoyed by users of all abilities.
The projected population of any development is calculated using the number of
bedrooms.  Developers should use Table 3 to work out the average occupancy for
their site.  Appendix 3 provides worked examples of how this is done. 
Dwelling
Size
Household
size
Quantity of Open
Space
1 bed 1.3 39m2 (30 x 1.3)
2 bed 1.9 57m2 (30 x 1.9)
3 bed 2.5 75m2 (30 x 2.5)
4 bed 3.0 90m2 (30 x 3.0)
5 bed 3.3 99m2 (30 x 3.3)
Table 3 Average household occupancy based on Scottish Household Survey
(2013)
The provision of public open space does not preclude or replace the need for private
garden/amenity areas that are commensurate with the needs of the type and size of
properties.
How will these standards be used?
Accessibility, quality and quantity standards will be used to inform provision of open
space for new development in West Dunbartonshire.  
Developers will need to demonstrate that the open space they propose in relation to
a development site is based on an assessment of these measures. 
Accessibility is a key objective for the Council so even if a development site is in an
area which has a good general provision of open space, if these are not readily
accessible from the site i.e. within 250m, then provision on-site will have to be made
or works carried out to improve accessibility e.g. new footpath connection.
Page 153

Page 154

On‐‐‐‐site provision for residential developments 
Green infrastructure should be designed into the proposal at an early stage in the
process and the open space standards of accessibility, quality and quantity used to
determine what level of on‐site provision there should be. Design Statements should
record the appraisal carried out of the existing green network and set out justification
for the level of provision.
There is an expectation that major residential developments provide an equipped
play area if there is not adequate provision within 250m. Equipped play areas, must
include accessible play equipment so that they can be enjoyed by users of all
abilities. For some residential sites it will not be appropriate to form play spaces or
equipped play areas and instead a financial contribution is expected.
Policy GI4 and Part 4 of this Guidance sets out the circumstances under which off-
site provision or a financial contribution to enhance the green network may be
appropriate. In these cases, where off-site provision is acceptable, a hybrid approach
may be appropriate if part of the open space requirement can be met on-site with a
contribution towards meeting the rest of the requirement off-site, may be appropriate.
Green infrastructure stewardship
Well‐designed green infrastructure should continue to deliver multiple benefits into
the future. Consideration as to how the various features of the green network will be
maintained will ensure that it remains ‘fit for purpose'.
Just as ‘grey infrastructure’ elements, such as roads and drains, require ongoing
maintenance, so does green infrastructure. Many of the problems associated with
the quality of existing open spaces reflect the lack of initial consideration given to
funding and management mechanisms for effective long term management of green
infrastructure. Good stewardship ensuring the long-term quality of green
infrastructure is vital to a well‐ functioning green network.
Partnership working and agreements between public agencies and other
organisations may be necessary to recognise the multi‐functional nature of the green
infrastructure and ensure that resources that would otherwise be spent on ‘grey'
infrastructure are allocated to the effective management of the green infrastructure.
Applicants should demonstrate how their design proposals will be sustainably
managed over the long‐ term including financial models for future funding of
appropriate management and maintenance.
Planning conditions and legal agreements may be used to ensure that new
developments provide details of the ongoing maintenance of sites. There are
different options for management and maintenance depending on the tenure and
nature of the site. For private housing, the preferred method is a requirement for
maintenance and management of all common areas through a factor to form part of
the land title for all owners of a site. Registered Social Landlords will have to provide
evidence of a regular maintenance contract.
Page 154

Page 155

Part 4 – Developer contributions and green infrastructure projects
This section provides further information and guidance on Policy GI4 of Local
Development Plan 2 and the Council’s requirements for development contributions
for green infrastructure. 
Legal and policy framework
This Supplementary Guidance has been prepared within the context of the following:
1. Town & Country Planning (Scotland) Act 1997 (as amended);
2. Local Government (Scotland) Act 1973
3. Town and Country Planning (Development Planning) (Scotland) Regulations
2008;
4. Circular 3/2012: Planning Obligations and Good Neighbour Agreements; and;
5. West Dunbartonshire Local Development Plan 2.
Developer contribution framework
The requirement for a developer to make an appropriate development contribution,
where the circumstances set out in Policy GI4 arise, is mandatory and will be treated
as a material consideration in the assessment and determination of planning
applications for residential development.
As a result, the Council has established a framework of how developer contributions
are collected and how they will be monitored annually, which is described in the
monitoring section below. 
In addition to any contributions made under Policy GI4 and this Supplementary
Guidance, developers will require to meet the costs of providing the service
infrastructure necessary for their development.
When will contributions be sought?
Contributions will be sought in line with the circumstances set out in Policy GI4 of
Local Development Plan 2. These are:
1. Smaller sites of less than 10 units where provision of on-site recreational
green infrastructure is not possible.
2. Developments where meeting the green infrastructure standards for on-site
provision is not appropriate, e.g. high density urban areas
3. Where a development site is accessible to open spaces but those spaces are
of a poor quality; and
4. Where development sites are accessible to good quality open spaces but a
contribution to the green network is required to enhance its provision to the
Central Scotland Green Network.
What will the contribution be?
The West Dunbartonshire standard for the required quantity of greenspace is 30m2
per person. 
The contribution for financial year 2022/23 is £30 for every m² of open space
required for the site. This figure is based on what it would cost to provide a facility
Page 155

Page 156

2,000 m² (0.2ha) in size which includes a small play park, kick‐about area,
biodiversity area and path connection. Excluding land costs, this would be in the
region of £60,000.
As the costs of developing and implementing green infrastructure projects will
increase over time, it is considered prudent and necessary that project costs are kept
in line with the rate of inflation. Therefore, this guidance stipulates that project costs
are index linked and that costs are revised on 1st April each year using the General
Building Cost Index (GBCI) to reflect the increased project costs as they arise. If the
GBCI falls then developer contributions will remain at the same rate as in the
previous year
How is the contribution calculated?
To calculate the contribution the first step is to work out how much open space would
be required for the site using the quantity standard and estimated site population. 
The projected population of any development is calculated using the number of
bedrooms, which is based on data from 2013 extrapolated from the 2010 Census.
Developers should use Table 4 to work out the occupancy for their site. Appendix 3
provides worked examples of how this is done.
Table 4 – Open space standards for residential development
The contribution is calculated by totalling the amount of greenspace required across
the site based on number and dwelling size of units. That is then multiplied by £30
per sq. metre (2022/23). For example, if there are 25 x 2 bed dwellings and 30 x 3
bed dwellings then the calculation would be:
Total open space provision = 25 x 57m2 = 1,425
+ 30 x 75m2 = 2,250
= 3,675 sq. metres
Developer contribution calculation = 3,675 x £30 = £110,250
Dwelling size Household size Quantity of greenspace to be
provided per house
1 bed 1.3 39 m²  (30 x 1.3)
2 bed 1.9 57 m² (30 x 1.9)
3 bed 2.5 75 m²  (30 x 2.5)
4 bed 3.0 90 m²  (30 x 3.0)
5 bed 3.3 99 m²  (30 x 3.3)
Page 156

Page 157

When will developer contributions be required to be paid?
The Council will require developers to make their developer contributions to the
Council prior to planning consent being issued, unless the payment of the
contributions is determined through a Section 75 or other agreement agreed
between the Council and the developer, which specifies a different payment
schedule or date for the contributions to be made. 
Financial mechanisms
In most cases, developer contributions will be delivered through either a Section 75
or Section 69 agreement.  In some cases it may be deemed that these mechanisms
are not required or appropriate, and payment may be made up front, prior to
planning consent being issued.
Where it has been agreed that payment will not be made at the time of concluding
the legal agreement, i.e. where phased payments have been agreed, the sums
involved will be index linked to the General Building Cost Index (GBCI). However, if
the GBCI falls then developer contributions will continue at the same rate as in the
previous period. In certain instances, the party to the agreement may also be
required to guarantee the availability of funds, for example through a bond with a
bank or insurance company in order to prevent any default in payment through
bankruptcy, liquidation or refusal to pay. Late payments may also incur interest
charges, which will be calculated at 5% per annum above the base rate of the Bank
of England.
What projects will developer contributions be spent on?
The Council will publish a schedule of general and specific projects that developer
contributions will be used towards. This will be updated annually. 
Are there any circumstances when developer contributions will be reduced?
Policy GI4 states that contributions sought under this policy will be waived or
reduced only in exceptional circumstances – for example, where a developer
demonstrates that their development would have exceptional development costs
and/or overriding economic, social or other benefits. 
Where it can be demonstrated that paying the full contribution would make a
development unviable, developers may be permitted to negotiate a reduced
contribution. 
In such cases, developers will be required to submit a full development appraisal,
including costs, on an open book basis, to the Council for consideration. For
verification purposes, the Council may seek an assessment of the submitted
appraisal from the District Valuer or other mutually agreed independent valuation
surveyor at cost of the developer/applicant.
Appendix 4 of this Supplementary Guidance provides further advice on the level of
information that will be required in the development appraisal and how this will be
assessed by the Council. 
In addition to developers being able to negotiate reduced contributions, the Council
also provides flexible methods of developer contribution payments. Consequently,
Page 157

Page 158

developers may be able to enter into an agreement with the Council in order to
arrange for the payment of developer contributions at a later stage in the
development process. This allows flexibility to meet changes in the wider economy.
Monitoring
The Council has an agreed system for collecting, distributing and monitoring
developer contributions which was approved by Planning Committee on 6th
September 2017.
The Development Planning and Place Team, in conjunction with the Council’s
Finance Service, monitor the Developer Contributions fund for auditing and project
management purposes. 
A monitoring report will be presented to Planning Committee on an annual basis
which updates the committee on:
1. the amount of developer contributions received;
2. which projects have been undertaken and the total cost for each project;
3. the remaining developer contributions held by the Council; and
4. the general and specific projects that the contributions will be used towards.
The time period in which developer contributions must be spent within is 10 years
from the grant of planning consent and/or when the development contribution has
been paid to the Council, whichever is later. This length of time is considered
appropriate because of the length of time some developments take to complete and
because, in some instances, contributions will be towards larger green infrastructure
projects which will be funded from a variety of sources. Should the contribution not
be spent in this timeframe, unless there has been exceptional circumstances, the
money will be returned to the applicant including the interest that has been accrued
on the contribution.
Page 158

Page 159

Appendix 1: Developer’s flowchart
Major residential developments (50 units or more) will be required to provide on-site play equipment if there is not an equipped play
area with 250m of the site.
** If a residential development site meets the quantity standard through on-site provision, no financial contribution to the green
network is required.
Page 159

Page 160

Appendix 2: Green infrastructure checklist
Green Infrastructure Planning Policy Compliance
Page 160

Page 161

Appendix 3: Developer contributions examples
Example 1 - using the quantity standard
A residential site proposes a mixed development of 80 units comprising flats, terraced, semi‐detached and detached properties.
There are two blocks of 12 flats consisting of 6 1‐bed and 18 2‐bed flats. There are 56 houses comprising a mix of eight 2‐bed
terraced houses, thirty 3‐bed semi‐detached houses and eighteen 4‐bed detached properties. What is the expected occupancy and
what should the minimum open space provision be?
STEP 1 – Work out the number of bedrooms
Unit Type Number of Units
1 Bed 6
2 Bed 26
3 Bed 30
4 Bed 18
TOTAL 80
STEP 2 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 6 234
2 1.9 57 26 1482
3 2.5 75 30 2250
4 3 90 28 2520
Page 161

Page 162

Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
5 3.3 99 0 0
Total 80 6486
STEP 3 – Add the open space provisions together to get the total open space required which would be in this case 6,486 sq.m
This is the amount of open space to be provided for a development proposal of this size. The form of this needs to be determined
using the site appraisal method. For example, in a situation whereby the site is not within 250 metres walk of a 0.2ha usable
greenspace, then 6,486 sq.m
Developer flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? No
On-site provision should be based on the quantity and quality standards for residential development. Financial contributions for
all/part will be considered in some cases
Page 162

Page 163

Example 2 - using the quantity standard for small sites
A small housing opportunity site proposes a block of four one‐bed flats. What is the expected occupancy rate and the minimum
open space provision?
STEP 1 – Work out the number of bedrooms
Unit Type Number of Units
1 Bed 4
2 Bed 0
3 Bed 0
4 Bed 0
TOTAL 4
STEP 2 - Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 4 156
Total 4 156
STEP 3 – 156 sq.m is the amount of open space to be provided. However, as per the Developer’s Flowchart (Appendix 1), as it is a
small site of less than ten units and therefore requires a financial contribution to be provided instead of providing on‐site.
STEP 4 – Multiply the open space provision by financial contribution rate of £30 per sq.m 156 sq.m x £30 = £4,680
Developer flowchart analysis
Is the proposal for 10 or more units? – No
Page 163

Page 164

A financial contribution, based on the quantity standard, for the wider Green network will be required.
Page 164

Page 165

Example 3 - accessibility standard: on‐‐‐‐site provision or financial contribution
The development site is a gap site within a built up area. It is 0.41ha in size and the proposal is to build a single block of flats. There
is a mix of 15 one‐bed and 30 two‐bed flats. What would the developer be required to provide?
STEP 1 – Using the flow chart in Appendix 1, the proposal is for more than ten units so the first step is to see if it meets the
accessibility standard i.e. is it within 250m of a 0.2ha space? The site is in an urban area where a high density development is
supported. The applicant has made a case for making a financial contribution to upgrade play equipment in a large park less than
250m walking distance from the development site. It is agreed that off‐site provision is more appropriate in this instance so the
contribution needs to be calculated.
STEP 2 - Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 15 585
2 1.9 57 30 1710
Total 45 2,295
STEP 3 – To get the total amount of open space required, add together the open space provision 585 +1710 = 2,295 sq.m. This is
the amount of open space to be provided. 
The site is in an urban area where a high density development is supported. The applicant has made a case for making a financial
contribution to upgrade play equipment in a large park less than 400m walking distance. It is agreed that off‐site provision is more
appropriate in this instance so the contribution needs to be calculated.
Page 165

Page 166

STEP 4 – Multiply the open space provision by financial contribution rate of £30 per sq.m, i.e. 2,295 sq.m x £30 = £68,850.
Therefore for this site a financial contribution of £68,850 required to upgrade play equipment in the park.
Developer flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? Yes
Does the quality of those spaces meet the quality standard? No, the play equipment is sub-standard
A financial contribution, based on quantity standard, to enhance off-site provision will be required.
Page 166

Page 167

Example 4 - using the quantity standard for large sites
A large housing development is proposed for a greenfield site (5.15ha). It is close to an existing woodland and a path network
which leads into the wider countryside. There are 115 dwellings proposed for the site, a mixed of detached, semi‐detached and
terraced properties. What would the developer be required to provide?
House size Number
of units
1-bed terraced 12
2-bed semi-detached 18
3-bed semi-detached 30
3-bed detached 25
4-bed detached 30
STEP 1 ‐ Using the flow chart in Appendix 1, the proposal is for more than ten units so the first step is to see if it meets the
accessibility standard i.e. is the site within 250m of a 0.2ha amenity greenspace, play space or natural/ semi‐natural greenspace?
The site is within 250m of a large natural/semi‐natural greenspace provided path links are made to connect into these areas from
the site. In addition, there is an expectation that major residential developments provide an equipped play area if they are not within
250m of one. The site appraisal identifies that there are no equipped play areas nearby. To meet the standards the site could
combine provision i.e. have on‐site provision and make an off‐site contribution to make the woodland accessible.
STEP 2 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 12 468
2 1.9 57 18 1026
Page 167

Page 168

Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
3 2.5 75 55 4125
4 3 90 30 2700
Total 115 8319
STEP 3 – To get the total amount of open space required, add together the open space provision 468+1026+4125+2700 = 8319
sq.m. This is the amount of open space to be provided.
This is the total amount of open space required based on the estimated population of the development. To provide on‐site and
make an off‐site contribution this figure is split: a 0.2ha (2000sq.m) equipped play space will be provided within the site and the
remainder will be a financial contribution to enhance access to and within the woodlands.
STEP 4 – The off‐site financial contribution to enhance access to and within the woodlands will be less the area of the equipped
play space i.e. 
8,319 sq.m – 2,000sq.m = 6,319sq.m 
£30 x 6,319 sq.m = £189,570
The provision responds to the site context.
Developer flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? Yes, but only if access improvements are
implemented
Page 168

Page 169

In this instance, the on-site provision of play equipment is required as it is a major development. This provision is subtracted from
the overall quantity provision required, with the balance of provision met through a financial contribution to enhance access to and
within the nearby woodlands.
Page 169

Page 170

Example 5 - not all of the site is accessible
A large housing development is proposed on a long, narrow site with the railway adjacent to the southern boundary. There are 104
dwellings proposed on the 2.8ha site: a mix of detached, semi‐detached, terraced and flatted properties. What would the developer
be required to provide?
STEP 1 ‐ The proposal is for more than ten units so the first step is to see if it meets the accessibility standard i.e. is it within 250m
of a 0.2ha of a useable park, amenity greenspace, play space or natural/semi‐natural greenspace? The site is within 250m of a
large park and recreation ground which is in need of an upgrade. However the railway separates the site from the park so that the
walking distance is greater than 250m for most of the site except the flatted properties to the west. Improving connections by
building a bridge is too expensive so some on‐site provision is required. There is an expectation that major residential
developments provide an equipped play area.
STEP 2 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 24 936
2 1.9 57 26 1482
3 2.5 75 38 2850
4 3 90 16 1440
Total 104 6708
STEP 3 – All the 1 bed flats (24) are within 250m of the play area so need to be excluded from the calculation of amount of on‐site
provision required i.e. subtract 936 sq.m from the total:
Page 170

Page 171

6708 – 936 = 5,772 sq.m meters
STEP 4 – The site would therefore still have to provide 5,772 sq.m of open space (including an equipped play area) and make a
financial contribution of 936 x £30 = £28,080.
Developer’s flowchart analysis
Is the proposal for 10 or more units? – Yes
Is the site accessible to existing open spaces i.e. does it meet the accessibility standard? Some parts of the site are
Does the quality of those spaces meet the quality standard? No
A financial contribution, based on quantity standard, to enhance off-site provision will be required. However, as some of the site is
further than 250m from the open space to be improved, on-site provision is required also, so a mix of on-site provision and financial
contribution will be sought.
Page 171

Page 172

Example 6 - looking at quality standards
A residential development of 45 flats is proposed, a mix of 30 two‐bed and 15 one–bed flats. Applying the accessibility standard, it
is located close to an existing park and the canal. What would the developer be required to provide?
STEP 1 ‐ The proposal is for more than ten units so the first step is to see if it meets the accessibility standard i.e. is it within 250m
of a 0.2ha amenity greenspace, play space or natural/semi‐natural greenspace? The site is within 250m of a park. The site has less
than 50 units so an equipped play park is not necessarily required on the site. The quality of that park needs to be assessed using
the quality standard.
STEP 2 – the most recent Audit carried out for this site shows that there are a number of concerns about the play equipment,
surfacing and path connections within the park. Using the scoring the play area is assessed as being below the 50% threshold and
requires investment. This means that the play area offers a valid opportunity for developer contribution funding asscociated with the
site.
STEP 3 – Determine the open space provision per number of units as per Table 6 of Local Development Plan 2
Bedrooms Household Size
Open Space
Per Unit
(household size x
30 sq.m) Units
Open Space
Total (sq.m)
(Open space x
units)
1 1.3 39 15 585
2 1.9 57 30 1710
Total 45 2295
STEP 4 – To get the total amount of open space required, add together the open space provision 585 + 1710 = 2295. This is the
amount of open space to be provided.
STEP 5– Multiply the open space provision by the financial contribution rate of £30 per sq.m i.e.2,295 sq.m x £30 = £68,850.
Page 172

Page 173

For this site a financial contribution of £68,850 is required to help upgrade the play equipment within the park.
Page 173

Page 174

Appendix 4: Information required to be provided in development appraisals
This appendix expands on what applicants are required to include in their development appraisals when asking for consideration of
a reduced or waived fee. 
The Development Appraisal 
The basic calculation to assess whether a contribution should be waived is as follows:-
(X) Estimated Sale Value of Completed Development.
(Y) Total costs of development including any land purchase. The required developer contribution is also a development cost and
should be included here.
(X) minus (Y) gives the expected profit level from the development. Developers will usually expect a profit between 10-20% of
development costs (Y) before proceeding with a development. Therefore, if the submitted appraisal shows that profit levels fall to
an unacceptable level when the developer contribution is included as a cost, the Council will give consideration to reducing the fee.
A greater level of detail than the top line numbers set out in the above basic calculation is however required to be provided within
the development appraisal. The estimated sale value of the development (X) should be broken down into house types to allow the
figures to be easily verified. 
For example:- 
12 no. 4 bed detached houses @ £200k = £2.4m 
4 no. 2 bed semi-detached houses @ £120k each = £0.48m 
Total estimated value of completed development - £2.88million 
Total development costs (Y) should be broken down into the following general headings:
(i) Land purchase costs;
(ii) Professional Fees including legal, project management, architect and estate agents;
(iii) Finance Costs i.e. Bank Interest charges;
Page 174

Page 175

(iv) Build Costs including all site infrastructure costs; and
(v) Developer Contribution Fee
All of the above information should be provided by the developer on an “open book” basis, with no confidentiality restrictions, to
allow the Council to verify the costs shown by developers if considered necessary. Wherever possible, costs should be confirmed
and certified by consultants employed by the developer.
Once all of the above information has been submitted, the Council may seek internal or external expertise to verify it and then a
decision about whether the contribution should be reduced will be made.
Page 175

Page 176

Appendix 5: Open Space Audit information note
In 2016 officers from the Planning Service, supported by officers from Greenspace,
undertook an audit of open spaces in the West Dunbartonshire Planning Authority
area, with some sites revisited/reassessed in 2018.
The audit involved visiting a range of sites across the area falling into the following
categories:
• Amenity greenspace
• MUGAs (multi-use game areas)
• Natural spaces
• Parks
• Play areas
An assessment sheet for each category of open space was used to score each site
(attached). The scoring sheet was created by the Glasgow and Clyde Valley Green
Network Partnership.
Sites were scored against the factors and criteria set out in the assessment sheet,
based on the subjective judgement of the visiting officer. A percentage score for
each site can be calculated by dividing the site’s actual score by the total possible
score available and multiplying by 100.
Given the subjective manner of initial scoring and the passage of time, it would be
prudent for sites to be revisited and scoring updated as part of any practical use of
the audit e.g. in relation to use of the Green Network and Green Infrastructure
Supplementary Guidance. An updated audit is likely to be undertaken in association
with the preparation of the next Local Development Plan (LDP3).
Mapping of the sites assessed and a summary of the information collected and
associated information, including scoring is available at:
https://westdunbarton.maps.arcgis.com/apps/webappviewer/index.html?id=fe102759
a63e4dfbb5251b21400f058a
Page 176

Page 177

PAN 65 code 6.31 (residential) SLUs Date: Surveyor
Site Name:
Site No:
Excellent - 5 Good - 4 Acceptable - 3 Poor - 2 Very poor - 1 Score
1 Site composition
a Site topography, drainage and
configuration. i.e. extent of site
usuable.
Most (80% or more) of the site is
flat and dry, grassed or similar
and usable for recreational
activities
About half of the site (35 -
75%) is flat and dry,
grassed or similar and
usable for recreational
activities
Little (20% or less) of the
site is flat and dry, grassed
or similar and usable for
recreational activities
b Visual diversity of site Site has a strong a mix of
planting, colour, and visual
interest.
Site has some visual
interest and diversity.
Site has little interst and is
largely mown grass.
c Range of functions available to
users
3 or more functions available e.g.
formal play, MUGA, kickabout
potential, wild areas, seating and
relaxation areas
1 or 2 functions available
to user
Site is effectively mown
grass with little functional
value
subtotal
2 Access appropriate to Amenity
Open Space
a Core route running through or
adjacent to the site, linking
destinations outwith the site
DDA compliant and in excellent
condition, path is well lit and has
seats and bins and there are no
physical barriers between the
route and the site itself.
DDA compliant, in
acceptable condition and
path is lit with some seats
or bins.  Barriers may
exist but are negotiable.
Not DDA compliant (too
steep etc) and/or no lights,
seats or bins.
b Internal access - either in addition
to a through route or only serving
the site 
DDA compliant good condition
with path access to significant
areas of space, seats and bins
DDA compliant,
acceptable condition with
path access to some
areas of space
Not DDA compliant (too
steep etc) and in poor
condition
c No internal paths. Access is
directly from pavement or road
adjacent to site
Can only score 1
subtotal
3 Visitor experience
a Perception of safety No areas with poor sight lines,
entrapment points, obvious signs
of anti-social behaviour
Some areas with poor
sight lines etc but these
can readily be addressed
Lots of remote areas of poor
visibility and remote
entrapment points with no
escape options
b Open and welcoming/inviting Space has an obvious sense of
place and is ledgible as a
publically accessible and usable
resource
Space can and is used
but some sections of the
community by the overall
feel could be improved
encouraging more use
Space feels unwelcoming
and deters use
c Usability highly usable moderately usable Effectively unuseable
subtotal
4 Management and maintenance
a Planned enhancement  through
council resources, community
involvement, grant aid or planning
gain (if already enhanced - n/a)
Detailed plans/designs in place
and resources allocated or
actively being sought
Some aspectes of the site
being considered for
enhancement but further
work required
No plans
b Quality of Maintenance Evidence of regular and
appropriate maintenance to a
high standard in all areas
Evidence of appropriate
maintenance to a
reasonable standard in
key areas
Evidence of minimal or poor
quality maintenance in most
areas
c Control of vandalism, litter, dog
fouling
No or very limited
vandalism/fouling/litter which
doesn't affect the user
experience with good provision
of dog and litter bins
Some limited evidence of
vandalism/ fouling/ litter,
but doesn't detract from
the overall usage of the
open space.  Occasional
bins.
Lots of
vandalsim/fouling/litter
seriously deterring the
usage of the site.  No bins.
subtotal
5 Biodiversity contribution to
green network
a Diversity of planting which
supports wildlife by providing food
and shelter
A wide range of plants and trees
of differing species, height and
age structure.  High proportion of
native species.
A moderate range of plant
and tree diversity with
moderate proportion of
native species
A poor range of plant and
tree diversity
b Range and quality of habitat types
present
A mosaic of different habitats
types e.g. broadleaved
woodland, species rich
grassland, open water and
wetland
Some habitat diversity but
limited
Monoculture with very
limited biodiversity value
c Habitats present are linked or
near a wider network
Obviously within reach of other
adjacent habitat patches allowing
species movement
Possibility of species
movement via the routes
above but not as well
connected.
Fragmented space sitting in
isolation and is unlikely to
be part of a habitat network
subtotal
Total score
Notes: continue on back if required
Scoring of 5 (c) should be verified by use of aerial photography or other sources e.g. habitat maps, if required
Amenity Open Space
Quality Assessment Criteria
Note - Score 2a and 2b below if they are both present on site.  If either are absent enter n/a in the appropriate box
Based on your assessment of the site's performance in relation to all of the previous criteria in sections 1, 2 and 3 above, do you feel the
site is:
Page 177

Page 178

Multi Use Games Areas (MUGAs)
tick for each
1 3 2 1 Score
a Good Satisfactory Poor
b Good Satisfactory Poor
c Good Satisfactory Poor
2 3 2 1
a Good Satisfactory Poor
b Good Satisfactory Poor
3 Good Satisfactory Poor
a Good Satisfactory Poor
b Good Satisfactory Poor
c
Total
6.4
Access and security
Enclosed/fenced with gate/dog grill
Overlooked by nearby housing
Good all-ability footpath links to surrounding streets
Within park?
Within amenity greenspace?
Stand-alone?
Date:
Surveyor:
Site No:
Site Name:
Notes:
Condition
Fence - maintenance and vandalism
Condition of supporting infrastructure
Equipment - maintenance and vandalism
Safety surface - maintenance and vandalism
Supporting infrastructure
Presence of seating, bins, lighting
Page 178

Page 179

Woodland Open semi natural Date Surveyor
Location Urban Peri urban Rural
Excellent - 5 Good - 4 Acceptable - 2 Poor - 2 Very poor - 1 Score
1 Access
a Access points obvious, in good
repair and Disability Discrimination
Act compliant
Entrance points clearly
defined, signed, inviting,
clean, welcoming, well
maintained and accessible to
all.
Apparent as an entrance and
in average condition e.g.
some signage, entrance
features
Entrance points not
accessible to all, poorly
maintained and/or
inappropriately located
b Paths which give access to the
main features of the site in good
repair and Disability Discrimination
Act compliant
Paths in excellent condition
and are level with good bound
surfaces, edges well defined,
debris and weed free and well
maintained
Path generally in good
condition and the right place,
some maintenance/expansion
required
Paths generally in poor
condition, maintenance
needed, desire lines indicate
route issues
c Path network appropriate to the
scale and layout of the site
Extensive path network
servicing all parts of the site
Reasonable path network
servicing some of the site
No, or very limited path
network
sub total
2 Supporting infrastructure
a Provision of orientation and
directional signage and
interpretation
Signage and interpretation
well designed and delivered,
legible and well maintaned
with no signs of vandalism
Some signage provided, is in
reasonable condition and
maintained to an acceptable
standard
Lacking in signage or
inadequate and poorly
maintained
b Provision of seats, bins, lighting,
viewing areas etc
Good provision of supporting
infrastructure which is well
located, in good condition and
well well maintained
Some provision of supporting
infrastructure but could be
expanded upon and be of
better quality and better
maintained
Lacking in infrastructure or
inadequate and poorly
maintained
c Range of buildings and other
infrastructure e.g. car park, café,
visitor centre (criteria only
applicable to sites of sufficient
scale)
Good provision of
infrastructure which is in good
condition and well maintained
Some provision of supporting
infrastructure but could be
expanded upon and be of
better quality and better
maintained
Lacking in infrastructure or
inadequate and poorly
maintained
sub total
3 Visitor experience
a Perception of safety No areas with poor sight lines,
entrapment points, obvious
signs of anti-social behaviour
Some areas with poor sight
lines etc but these can readily
be addressed
Lots of remote areas of poor
visibility and remote
entrapment points with no
escape options
b Variety of experience e.g. open
glades, wooded areas, ponds
viewpoints etc
Good range of habitat types,
visual interest and a a varied
user experience
Reasonable range of habitat
types, visual interest and user
experiences
Lack of interest and poor
user experience.
c Open and welcoming/inviting Space has an obvious sense
of place and is ledgible as a
publically accessible and
usable resource
Space can and is used but
some sections of the
community by the overall feel
could be improved
encouraging more use
Space feels unwelcoming
and deters use
sub total
4 Management and maintenance
a Comprehensive Management
Plan in place which guides action 
(only applicable to sites of a
sufficient scale)
Recent and comprehensive
Management Plan in place
and being delivered
Historic Management Plan
exists but out of date but still
some adhoc management
No Management Plan
b Quality and appropriatenes of
maintenance
All areas are well maintained
in line with the habitat
requirements and time of year
Some maintenance on ad hoc
basis
No evidence of habitat
management
c Control of litter, dog fouling and
vandalism
No evidence of
fouling/litter/vandalism/fly
tipping/drinking
Some limited evidence of
fouling/litter/vandalism etc but
doesn't detract from the
overall usage of the space
Extensive
fouling/litter/vandalism etc
seriously deterring  use of the
space
sub total
5 Biodiversity and contribution
to habitat network
a Diversity of species and age
structure at field, shrub and
canopy layers
A wide range of plants and
trees of differing species,
height and age structure. 
High proportion of native
species.
A moderate range of plant and
tree diversity with moderate
proportion of native species
A poor range of plant and
tree diversity
b Range and quality of habitat
types present other than
woodland
A mosaic of different habitats
types e.g. broadleaved
woodland, species rich
grassland, open water and
wetland
Some habitat diversity but
limited
Monoculture with very limited
biodiversity value
c Woodland is part of a wider
woodland network
Obviously within reach of
other adjacent habitat
patches allowing species
movement
Possibility of species
movement via the routes
above but not as well
connected.
Fragmented space sitting in
isolation and is unlikely to be
part of a habitat network
sub total
Total
Notes: continue on back if required
Natural Spaces
Site name
Quality Assessment Category &
Page 179

Page 180

PAN 65 code 6.1 SLUs Date Surveyor
City, District or Local Park
Excellent -5 Good - 4 Acceptable - 3 Poor - 2 Very poor - 1 Score
1 Access relative to function
a Access points obvious, in good
repair and Disability
Discrimination Act compliant
Entrance points clearly
defined, signed, inviting,
clean, welcoming, well
maintained and accessible
to all.
Apparent as an entrance
and in average condition e.g.
some signage, entrance
features
Entrance points not
accessible to all, poorly
maintained and/or
inappropriately located
b Paths which give access to the
main features of the site in good
repair and Disability
Discrimination Act compliant
Paths in excellent condition
and are level with good
bound surfaces, edges well
defined, debris and weed
free and well maintained
Path generally in good
condition and the right
place, some
maintenance/expansion
required
Paths generally in poor
condition, maintenance
needed, desire lines
indicate route issues
c Path network appropriate to the
scale and layout of the site
Extensive path network
servicing all parts of the site
Reasonable path network
servicing some of the site
No, or very limited path
network
sub total
2 Design and layout
a Visual interest and balance
between elements present
Good balance between
aesthetic, amenity and
recreational elements
creating an attractive space
Adequate design and
balance between the
elements
Poor design and layout with
little interest
b Configuration of elements is
logical, legible and creates
useable space
Design and location of
elements takes account of
topography and aspect
supporting use.
Some aspects of the site
function well but are let
down by less well designed
elements
Elements disconnected and
illegible.  Poor design and
layout.
c Landscaping and vegetation
appropriate to space
Planting & vegetation well
laid out, successfully
reflecting and enhancing
slopes, views, vistas etc
Planting & vegetation
reasonably well laid out to
reflect and enhance slopes,
views, vistas etc
Planting & vegetation fail to
reflect and enhance slopes,
views, vistas creating a
bland space
sub total
3 Supporting infrastructure
a Provision of orientation and
directional signage and
interpretation
Signage and interpretation
well designed and delivered,
legible and well maintaned
with no signs of vandalism
Some signage provided, is in
reasonable condition and
maintained to an acceptable
standard
Lacking in signage or
inadequate and poorly
maintained
b Provision of seats, bins, lighting,
viewing areas etc
Good provision of
supporting infrastructure
which is well located, in
good condition and well well
maintained
Some provision of
supporting infrastructure but
could be expanded upon
and be of better quality and
better maintained
Lacking in infrastructure or
inadequate and poorly
maintained
c Range of buildings and other
infrastructure e.g. car park, café,
visitor centre (criteria only
applicable to sites of
sufficient scale)
Good provision of
infrastructure which is in
good condition and well
maintained
Some provision of
supporting infrastructure but
could be expanded upon
and be of better quality and
better maintained
Lacking in infrastructure or
inadequate and poorly
maintained
sub total
4 Visitor experience
a Range of user functions 3 or more functions e.g.
formal play, MUGA,
kickabout area, wild areas,
seating and relaxation areas,
bandstand, etc
1 or 2 functions available to
user
Site is effectively mown
grass with little functional
value
b Perception of safety No areas with poor sight
lines, entrapment points,
obvious signs of anti-social
behaviour
Some areas with poor sight
lines etc but these can
readily be addressed
Lots of remote areas of poor
visibility and remote
entrapment points with no
escape options
c Open and welcoming/inviting Space has an obvious sense
of place and is ledgible as a
publically accessible and
usable resource
Space can and is used but
some sections of the
community by the overall
feel could be improved
encouraging more use
Space feels unwelcoming
and deters use
sub total
5 Management and
maintenance
a Comprehensive Management
Plan in place which guides
action  (only applicable to
sites of a sufficient scale)
Recent and comprehensive
Management Plan in place
and being delivered
Historic Management Plan
exists but out of date but still
some adhoc management
No Management Plan
b Quality of Maintenance Evidence of regular and
appropriate maintenance to
a high standard in all areas
Evidence of appropriate
maintenance to a reasonable
standard in key areas
Evidence of minimal or poor
quality maintenance in most
areas
c Control of vandalism, litter, dog
fouling
No or very limited
vandalism/fouling/litter
which doesn't affect the user
experience with good
provision of dog and litter
bins
Some limited evidence of
vandalism/fouling/litter, but
doesn't detract from the
overall usage of the open
space.  Occasional bins.
Lots of
vandalsim/fouling/litter
seriously deterring the
usage of the site.  No bins.
sub total
6 Biodiversity contribution to
habitat network
a Diversity of planting which
supports wildlife by providing
food and shelter
A wide range of plants and
trees of differing species,
height and age structure. 
High proportion of native
species.
A moderate range of plant
and tree diversity with
moderate proportion of
native species
A poor range of plant and
tree diversity
b Range and quality of habitat
types present
A mosaic of different
habitats types e.g.
broadleaved woodland,
species rich grassland, open
water and wetland
Some habitat diversity but
limited
Monoculture with very
limited biodiversity value
c Habitats present are likely to be
part of a wider network
Obviously within reach of
other adjacent habitat
patches allowing species
movement
Possibility of species
movement via the routes
above but not as well
connected.
Fragmented space sitting in
isolation and is unlikely to
be part of a habitat network
sub total
Total
Notes: Continue on back if required
Parks and Gardens
Site Name :
Quality Assessment Criteria
Page 180

Page 181

6.4
tick for each
1 Age Range
a Up to 7yrs
b 7 to 14 yrs
c 14 yrs plus
2 Range of equipment 3 2 1 Score
a number of play pieces 10+ 10<5 5<0
b diversity of play experience offered Good Satisfactory Poor
c opportunities for natural play Good Satisfactory Poor
3 Condition of equipment and safety surface 3 2 1
a Maintenance and vandalism Good Satisfactory Poor
b Old and outdated equipment New Satisfactory Old
c Evidence of removed pieces Many Some None
3 Supporting infrastructure 3 2 1
a Presence of seating, bins, lighting Good Some No
b Condition of supporting infrastructure Good Satisfactory Poor
4 Access and security 3 2 1
a Enclosed/fenced with gate/dog grill Yes Partly No
c Overlooked by nearby housing Yes Partly No
d Good all-ability footpath links to surrounding streets Yes Yes No
Total
Notes:
Within amenity greenspace?
Stand-alone?
Children's Play
Site No:
Site Name:
Surveyor
Date:
Within park?
Page 181

Page 182

ITEM 7 - Appendix 6
Green Network and Green Infrastructure – comments received on draft version and Council’s proposed response
Respondent Comment WDC response
The Coal
Authority
Our records indicate that within the West
Dunbartonshire area there are recorded coal mining
features present at surface and shallow depth
including; mine entries, shallow coal workings and
reported surface hazards.  These features pose a
potential risk to surface stability and public safety.  
The Coal Authority’s records also indicate that
surface coal resource is present on the site, although
this should not be taken to imply that mineral
extraction would be economically viable, technically
feasible or environmentally acceptable.   As you will
be aware those authorities with responsibility for
minerals planning and safeguarding will have
identified where they consider minerals of national
importance are present in your area and related
policy considerations.  As part of the planning process
consideration should be given to such advice in
respect of the indicated surface coal resource.
It is noted however that this is a draft SPG on Green
Network and Green Infrastructure and I can confirm
that the Planning team at the Coal Authority have no
specific comments to make on this documents.   
It is noted that the Coal Authority has no specific
comments on this document.
It may however be worth noting that if SUDs are
proposed as part of developments green
infrastructure consideration will need to be given by
These comments, about the design and development
process of SUDs, are more relevant to the Creating
Places Supplementary Guidance and the respondent
Page 182

Page 183

the developer to the implications of this in relation to
the stability and public safety risks posed by coal
mining legacy.  The developer should seek their own
advice from a technically competent person to ensure
that a proper assessment has been made of the
potential interaction between hydrology, the proposed
drainage system and ground stability, including the
implications this may have for any mine workings
which may be present beneath the site.
has agreed they may be addressed in relation to the
consultation on that draft supplementary guidance.
Glasgow &
Clyde Valley
Green
Network
Partnership
Generally the SG is very good, clear, concise and
focusses on the things we'd want to see delivered
through development.
This support is welcomed.
Page 4: Suggest this text here and in the graphic
below is changed:
Under Greenspace substitute for:
“is any vegetated land or structure, water, path or
geological feature within and on the edges of
settlements.”
Under Green Infrastructure substitute for: “is
greenspace which is designed and/or managed to
provide identified functions.”
Agreed, Figure 1 has been changed to reflect these
comments.
Page 5: Request for wording in the ‘Planning and the
green network and green infrastructure’ section to be
strengthened
Agreed, the phrase “where possible” has been
deleted, which brings the text in the supplementary
guidance in to line with the strategy as written in the
LDP2.
Page 7: Suggested alternative wording in the
‘Embedding the green network and green
infrastructure’ section:
add “providing an overall net gain in provision” to first
bullet point; and
add “which have designed functions for a range of
users” to 4th bullet point.
Agreed, these changed have been made, with a
qualification that net gain can be either qualitative or
quantitative (Page 8).
Page 183

Page 184

Page 8: In Green infrastructure function: habitat
enhancement section, use the term ‘nature networks’
in line with the draft NPF requirements?
Agreed, the wording has been changed to ‘nature
networks’.
Page 11: Incidental greenspace and landscaping will
not count to towards the quantity standard.
Developers should provide a site plan indicating
which spaces comprise provision
Agreed, this wording has been added.
Page 19 – Appendix 2: Only some of the relevant
LDP policies are cross-referenced in the graphic
Noted, the graphic has been updated with all policy
cross-references.
Historic
Environment
Scotland 
The drafts for our historic environment interests have
been considered , and can confirm that we have no
comments on their content.
It is noted that Historic Environment Scotland has no
specific comments on this document.
Homes for
Scotland
Introduction 
Homes for Scotland (HFS) welcomes the opportunity
to comment on West Dunbartonshire’s Draft
Supplementary Guidance (SG) in relation to Green
Network and Green Infrastructure. 
This submission sets out our representations in
relation to the published draft SG. Firstly though,
there are some general matters of concern to HFS.
Noted
General Concerns 
It is stated within this Guidance that will be adopted
as statutory supplementary guidance, forming part of
Local Development Plan 2 (LDP2). Given LDP2 has
not yet been adopted, and therefore its final form is
not currently known, it is problematic to be publishing
SG to support this. It is not even known whether
LDP2 will in fact ever be adopted. 
General Concerns 
The status of the Supplementary Guidance has been
clarified at the front of the document. The guidance is
intended to be adopted as supplementary guidance to
the Local Development Plan (LDP2) and provides
further detailed guidance on the content thereof, it is
therefore not premature in relation to the emerging
National Planning Framework or Development
Planning Regulations, as the LDP has been prepared
Page 184

Page 185

LDP2 does not currently form part of the
Development Plan, as it remains unadopted.
Therefore, the lower tier of the Development Plan in
West Dunbartonshire is the West Dunbartonshire
Local Plan (WDLP), adopted in March 2010. The
status of this Plan has been significantly eroded, as it
is now over 7 years out of date. 
The draft SG has also been released just ahead of
the anticipated new Development Management
Regulations and National Planning Framework 4
(NPF4). For these reasons it could be argued that the
revision and delivery of new SG is premature. 
As noted above, it is stated that the Council intends to
adopt the proposed new SG as part of the statutory
Development Plan. However, this statutory status
might only last for a limited period as all such
guidance will at some point have to be non-statutory
under the soon to be published new Regulations and
NPF4. While it is acknowledged that Scottish
Ministers have made provision for a 24 month
‘transitional period’ following publication of the new
Regulations, the draft new SG could end up being
part of the adopted development plan for a limited
period after which the council will require to undertake
a further revision to reflect the non-statutory status
thereafter. 
As we don’t yet know what the new Regulations will
look like and how the transitional period will be
implemented, HFS is of the view that the Council
and will be adopted based on the current Scottish
Planning Policy, and the current Development
Planning Regulations and in line with transitional
arrangements. 
The guidance on transitional arrangements indicates
that Planning Authorities will require to decide if the
content of Supplementary Guidance should move to
planning guidance or be included within local
development plan itself. However the guidance also
indicates that new supplementary guidance can be
prepared and adopted until Section 22 of the 1997
Act is repealed and for a further 24 month period
thereafter. 
Page 185

Page 186

should consider moving straight to publication of non-
statutory SGs as other Local Authorities, including
South Lanarkshire Council, have done.
Regardless, the draft Guidance, in places, appears to
go beyond merely supplementing policies within the
LDP but rather looks to introduce new and more
onerous requirements for developments to meet. This
is not an appropriate use of SG as the principles of
policy have not been properly scrutinised or tested as
part of the LDP examination. 
Planning Circular 6/2013 (Development Planning)
notes that Regulation 27 (2) of The Town and Country
Planning (Development Planning) (Scotland)
Regulations 2008 requires SG to be limited to the
provision of further information or detail in respect of
policies or proposals set out in the SDP or LDP.
There must be a sufficient “hook‟ in the SDP or LDP
policies or proposals to hang the SG on, to give it
statutory weight. 
This matter was reinforced by a letter sent to All
Heads of Planning on 15 January 2015 by The Chief
Planner, which states: 
“For supplementary guidance to be issued in
connection with a local development plan, this means
that the guidance may only deal with the provision of
further information or detail in respect of policies or
proposals set out in the local development plan and
then only provided those are matters which are
expressly identified in a statement contained in the
The Council considers that LDP2 provides sufficient
‘hooks’ for the Green Network and Green
Infrastructure Supplementary Guidance. The
Supplementary Guidance is referenced 16 times in
LDP2, in various sections of the Plan, in both policies
and explanatory text, reflective of the Plan’s green
infrastructure first approach. The Supplementary
Guidance serves the purpose of providing further
information or detail in respect of policies set out in
LDP2. 
Page 186

Page 187

plan as matters which are to be dealt with in
supplementary guidance.” 
We believe specific sections of the draft SG breach
these requirements, as detailed below. 
Any mechanism which may seek to restrict the
deliverability of new homes to meet the housing crisis
which prevails in Scotland must be resisted. As we
move towards the new system under NPF4, the
threshold for what constitutes a “deliverable” site is
greater than previously existed, and it is against this
backdrop that all policies/strategies must now sit.
Affecting the deliverability of sites through the
introduction and requirement of a range of additional
asks must be seriously considered. 
The Scottish Government have indicated in the draft
NPF4 that the Climate and Nature Crises should be
given the highest priority when considering planning
issues. While it is acknowledged that the final NPF
has yet to be published, the Planning Authority
recognises that the Climate Crisis, Nature Crisis and
any housing crisis are all part of the range of issues
which are considered when preparing policy and
guidance and it sits with the Planning Authority to
afford appropriate weight to these and all other
relevant considerations.
Green Infrastructure Delivery in New Development 
The draft Guidance refers to situations where a
developer contribution towards off-site improvements
may be sought. Whilst the principle of this is
supported there should be reference to hybrid
scenarios where a combination of off and on-site
provision/improvements may be appropriate. 
It is agreed that a hybrid approach may be acceptable
where on-site provision cannot be met in full, as
indicated by the Developer’s Flowchart, Appendix 1
and Appendix 3, examples 4 and 5. Further
clarification of this has been added to the guidance
(page 15). However the requirement, and preference,
for on-site provision with a limited number of
exceptions is retained.
Biodiversity Enhancement  Biodiversity Enhancement 
Page 187

Page 188

While HFS does not object to the principle of
‘biodiversity enhancement’, there is currently
insufficient information as to precisely what this will
mean in practice. Draft NPF4 indicates that Scottish
Ministers are still considering this themselves and it
therefore appears likely that there will be further
national guidance on the matter in the final version of
NPF4. It is therefore premature to implement this
requirement for new planning applications.
Policy CP2e requires Habitat Enhancement, and
indicates that, “Development proposals must protect,
restore and enhance biodiversity habitat networks,
and environmental quality within and linking to the
site. Opportunities for improving the conservation
status of priority species and the inclusion of
ecological features within the built environment
should be considered” This policy is within the plan
and has been through examination. It is therefore
disagreed that it is premature to provide further detail
on this policy. No change required.
Open Space – Establishing Need and Opportunity
Table 1 outlines that Open Space provision may be
required for proposals of 10 or more units, in
situations where “need/opportunity identified”. Further
clarification is required here. How is need and
opportunity to be assessed? What specific
assessment processes are in place which would
trigger the requirement for Open Space? There is a
lack of information here, which risks causing
uncertainty, and subsequently viability concerns. 
It is also worth noting that this ambiguous phrasing
also pertains to the potential requirement to deliver
Access Networks, Water Management and Habitat
Networks.
Appendix 1 of the Supplementary Guidance sets out
a flow chart which provides a guide to the
expectations for the provision of open space. The
guidance also states that “The green network
requirements for each individual site will be discussed
and agreed at pre-application stage.” 
Policy CP2 Green Infrastructure and the
Supplementary Guidance set out a green
infrastructure first approach to the provision of access
networks; open space; water management; and
habitat enhancement so as to contribute to the
development and enhancement of a multi-functional
green network. The policy and guidance indicate that
this is best achieved through a design led approach
from the outset. Further guidance on how these
functions can be layered together to provide multiple
benefits for “health, wellbeing, wildlife, as well as,
climate change mitigation and adaptation” are given
in the Creating Places Supplementary Guidance. No
change is required in this regard.
Page 188

Page 189

Open Space Requirements
The draft SG states:
“All new housing developments should provide
access to 30m2 of publicly useable open space per
person.” 
The Council’s most recent update to the Open Space
Audit was in 2018 and is therefore four years old. It is
not clear, therefore, how the Council has reached the
conclusion that the above volume of Open Space is
required to be provided. It is also recommended that
the Council aligns its Open Space requirements with
many other Local Authorities’ approaches, including
East Lothian Council, by amending the requirement to
be provided on a per dwelling basis, rather than per
person, given the number of dwellings will be known
(and constant), whereas the number of people will
not. 
Based on the 2011 Census the average household
occupancy within West Dunbartonshire is 2.15 people
per household. This data should be used to calculate
the Open Space requirement and potential
contribution rather than extrapolated data based on
the Scottish Household Survey. The Census data is
an accurate snapshot in time. 
The 30m2 per person requirement is established by
the Local Development Plan (LDP2), which has been
through examination. 
The Council considers that basing the open space
calculation on the average household size of different
dwelling sizes provides a more accurate open space
requirement than using a single average household
size figure. This approach has been used by the
Council since 2015 so is a well established approach
in West Dunbartonshire. 
No change is required in this regard.
The draft Guidance seeks to assess proposals
against three key standards – accessibility, quality
and quantity. The quality element of this is based on
the Council’s updated Open Space Audit (2018) and
The Council has now made the scores of its Open
Space Audit available online
(https://westdunbarton.maps.arcgis.com/apps/webap
pviewer/index.html?id=fe102759a63e4dfbb5251b214
Page 189

Page 190

the guidance notes that a contribution will be required
to upgrade off-site infrastructure where it is below a
threshold score. The Open Space Audit is not public
and the scores are therefore not available. HFS is
concerned that without sharing the evidence, there is
a risk that the Council are not complying with the tests
set out in Planning Circular 3/2012 if there is not full
disclosure when sums are being suggested. 
It is also understood that under the requirements of
the Planning (Scotland) Act 2019 that an Open Space
Strategy must contain an audit of existing Open
Space provision and an assessment of current and
future requirements. East Ayrshire have produced
Green Infrastructure/Open Space Standards
Supplementary Guidance which scores open space
within settlements. A further Council and East
Ayrshire Leisure publication titled Green Infrastructure
and Green Network Strategy Volume 2 then provides
a more detailed qualitative assessment and lists
specific upgrades that are required to specific parks. 
The general direction the Scottish Government
appear to be heading is the prioritisation of brownfield
land. As such, there will likely be a much higher
dependency on brownfield and higher density
development. This being the case, it is likely true that
there will be insufficient land to meet the housing
need if Open Space requirements are not sufficiently
flexible, and evidence of their requirement is
extremely robust. The rigidity of Open Space
requirements and their potential to hinder brownfield
00f058a) and an information note has been added as
an appendix to the Supplementary Guidance. An
updated audit will be undertaken as part of the next
Local Development Plan (LDP3) process. 
The Local Development Plan (LDP2) and this
Supplementary Guidance were prepared under the
provisions of the Planning (Scotland) Act 2006. The
approaches taken by other local authorities are not
binding on West Dunbartonshire Council, but the
Council will continue to investigate and be informed
by best/good practice elsewhere. 
West Dunbartonshire Council have always prioritised
the development of brownfield land and encourage
higher density in urban locations. It is considered
important for provision and consistency that open
space standards are set. The Supplementary
Guidance provides flexibility in allowing a financial
contribution towards the green network to be provided
if sufficient provision cannot be made on site. 
Page 190

Page 191

development from delivering the volume of homes
NPF4 says is required needs to be reviewed. It is also
important to note that brownfield-only development is
unlikely to deliver the volume of homes required, as
well as the Open Space requirements being sought.
General Developer Contributions
The draft SG states:
“The Council will publish a schedule of general and
specific projects that developer contributions will be
used towards. This will be updated annually.” 
This raises significant concerns, and risks affecting
the viability of sites. The presumption appears to be
that developer contributions may not be ring-fenced to
deal with impact of a specific development. This point
requires clarification. 
Any amendment to the contributions required with
regards to Open Space must be informed by an Open
Space Audit. 
It is suggested that a joined-up assessment of
housing need and Open Space requirement be
undertaken, which would lead to the Council to
identifying what is needed and where, and,
accordingly, would necessitate a review of the
allocated land. 
As noted above, any mechanism which would seek to
restrict the supply of deliverable land should be
resisted. It is vital that the housing crisis is addressed,
West Dunbartonshire Council Planning Committee,
approved the process to report and allocate
developer contributions received through the planning
system on 8 June 2022. These are available to view
at https://www.west-
dunbarton.gov.uk/council/strategies-plans-and-
policies/local-development-planning/other-guidance-
and-information/
The allocations document sets out that developer
contributions received will be allocated based on:
proximity to the site the allocation has been received
from; deliverability of the project; and eligible project
types, with some specific projects identified. Through
these criteria, the Council can link projects to deal
with the impact of a specific development. 
Changes to the allocation of land would be a matter
for the next Local Development Plan, 
Page 191

Page 192

and that placemaking policies are suitably adaptable
to factor in viability matters.
Retention Period for Funds
The draft SG seeks a 10-year time period for the
retention of funds. 
HFS objects to this proposed provision on the basis
that a period of 10+ years is excessive. If a
contribution can’t be spent within a shorter timescale
(e.g., 5 years), then it is questionable whether it was
appropriate in the first place and if it meets the
requirements of Planning Circular 3/2012.
It is considered that this retention period is
reasonable considering development timelines for
housing sites or the subsequent delivery of
associated green infrastructure projects. Planning
Circular 3/2012 does not specify a reasonable
timeframe, it therefore sits with the planning authority
to fix one that is reasonable. It is agreed that projects,
associated with a given development, should
delivered before this trigger is met.
NatureScot Overall support this Guidance and appreciate West
Dunbartonshire’s continued commitment to green
networks and green infrastructure. In particular, 
support the strategy of Local Development Plan 2
which underpins the guidance and which ‘seeks to
safeguard the existing green network, and to ensure
new development enhances and expands it by
improving existing green infrastructure assets, the
connections between them and by creating new multi-
functional green and open spaces’ (page 4). We
commend you on being awarded the ‘Building for
Nature Award’ for LDP2, recognising the whole
lifecycle approach to green infrastructure from design,
construction to sustainable management. 
They also support the identified purpose of the
Guidance as outlined on page 3 : ‘to define the green
network in West Dunbartonshire and identify its
assets and opportunities; outline the principles for
embedding the green network at the heart of new
This support is welcomed.
Page 192

Page 193

development using a green infrastructure first
approach; define open space standards that will be
required of new development and how these
standards will be achieved; and describe how
developer contributions for green infrastructure
associated with new developments will be calculated. 
They acknowledge the recognition given to the role of
the planning system as a key mechanism for
delivering the green network and the role of green
network in delivering outcomes, particularly with
regard to improving health and well-being, meeting
climate change targets, placemaking and securing
positive effects for biodiversity (page 5). 
Part 2 – Green infrastructure delivery in new
development
They  support the requirements for development
proposals set out on page 7, for safeguarding,
enhancing and expanding the green network and
green infrastructure. The requirements encompass
enhancing the functionality and biodiversity value of
existing assets, utilising the site appraisal and design
process to identify opportunities to enhance the value
of existing assets. They welcome the value attributed
to existing assets and consider that this will also help
deliver positive effects for biodiversity. 
Green infrastructure functions (page 7)
Welcome the focus given to the integration of the
green infrastructure functions of water management,
habitat enhancement, access and open space within
Page 193

Page 194

the design and layout of development as part of the
green infrastructure first approach, ensuring a whole
life approach to green infrastructure provision and
which also links and contributes to the wider green
network. 
Overall, they consider the document to be clear and
well presented, providing useful advice to developers,
including the Developer’s Flowchart, the Green
Infrastructure Checklist and Developer Contribution
Example, contained in the appendices.
Persimmon
Homes
The principle of setting out on and off-site
requirements is welcomed.
This support is welcomed.
Based on the 2011 Census the average household
occupancy within West Dunbartonshire is 2.15 people
per household. This data should be used to calculate
the open space requirement and potential contribution
rather than extrapolated data based on the Scottish
Household Survey. The Census data is an accurate
snapshot in time.
The open space standard per person, and ratio of
household size to dwelling size is established in the
Local Development Plan (LDP2), which has been
through examination. The use of house sizes in
specific developments rather than average household
occupancy is considered to provide a more accurate
open space requirement. No change is required in
this regard.
The draft guidance makes reference to situations
where a developer contribution towards off-site
improvements may be sought. Whilst the principle of
this is supported there should be reference to hybrid
scenarios where a combination of off and on-site
provision/improvements may be appropriate. 
It is agreed that a hybrid approach may be acceptable
where on-site provision cannot be met in full, as
indicated by the Developer’s Flowchart, Appendix 1;
and Appendix 3, examples 5 and 5. Further
clarification of this has been added to the guidance
(page 15. However the requirement, and preference,
for on-site provision with a limited number of
exceptions is retained.
The draft guidance seeks to assess proposals against
three key standards – accessibility, quality and
quantity. The quality element of this is based on the
The Council has now made the scores of its 2018
Open Space Audit available online
(https://westdunbarton.maps.arcgis.com/apps/webap
Page 194

Page 195

Council’s Open Space Audit that was updated in 2018
and the guidance notes that a contribution will be
required to upgrade off-site infrastructure where it is
below a threshold score. The open space audit is not
public and the scores are therefore not available. We
are concerned that without sharing the evidence,
there is a risk that the Council are not complying with
the tests set out in Circular 3/2012 if there is not full
disclosure when sums are being suggested. The
scale and kind test is of most relevance. It is also
understood that under the requirements of the
Planning (Scotland) Act 2019 that an open space
strategy must contain an audit of existing open space
provision and an assessment of current and future
requirements. East Ayrshire have produced Green
Infrastructure/Open Space Standards supplementary
guidance which scores open space within
settlements. A further Council and East Ayrshire
Leisure publication titled Green Infrastructure and
Green Network Strategy Volume 2 then provides a
more detailed qualitative assessment and lists
specific upgrades that are required to specific parks.
pviewer/index.html?id=fe102759a63e4dfbb5251b214
00f058a) and an information note has been added as
an appendix to the Supplementary Guidance. 
The Local Development Plan (LDP2) and this
Supplementary Guidance were prepared under the
provisions of the Planning (Scotland) Act 2006. The
approaches taken by other local authorities are not
binding on West Dunbartonshire Council, but the
Council will continue to investigate and be informed
by best/good practice elsewhere. 
Scottish
Government
Scottish Planning Policy (SPP) states
at paragraph 232: “In the design of
green infrastructure, consideration
should be given to the qualities of
successful places.” We suggest the SG
should make reference to those
qualities, which are set out in
paragraphs 41-46 of SPP. 
Agreed, reference to the six qualities of successful
places has been added (page 5).
Page 195

Page 196

In part 4, it is stated that contributions
for green infrastructure will be sought in
line with the circumstances set out in
Policy GI4 of the LDP, and lists those
four circumstances. 
Two of those circumstances are: 
Where a development site is
accessible to open spaces but those
spaces are of a poor quality; and 
Where development sites are
accessible to good quality open spaces
but a contribution to the green network
is required to enhance its provision to
the Central Scotland Green Network. 
It is not clear in the draft SG
(particularly the flowchart in Appendix
1) whether developer contributions
under Policy GI4 will/may be required
in the above two circumstances even if
the development includes sufficient
open space (meeting the relevant
quality and quantity standard) within
the development site. The flowchart in
Appendix 1 implies that such
contributions would be required in such
instances, but Example 1 in Appendix 3
does not. This should be clarified. 
Footnotes have been added to the flowchart to clarify
that: if a residential development meets the quantity
standard through on-site provision, no financial
contribution to the green network is required; and that
an equipped play area is required on a site of 50 units
or more, if there is not an equipped play area within
250m of the site (this highlights a requirement already
included in Part 3 of the guidance).
Page 10, ‘Accessibility standard’
It is stated that the accessibility standard is:
“Everyone will live within a 250m walk of a 0.2 ha
usable and good quality greenspace.” If ‘good quality’
Agreed, a change has been made to clarify this (page
12).
Page 196

Page 197

is intended to mean that the space meets the ‘quality
standard’ i.e. meets or exceeds the threshold score
set out in Table 2, this should be made clear. 
Pages 10-11, ‘Quality standard’
The draft SG on pages 10-11 refers to a ‘Quality
standard’, and states that the quality of an open
space is an assessment-derived score based on work
undertaken as part of the Open Space Audit carried
out in 2016 and updated in 2018 to reflect changes to
some spaces. 
It is stated that “The quality standard is: All publicly
usable open spaces should meet or exceed the
threshold score set out in Table 2”. Table 2 includes
different “Quality standard threshold scores”
expressed as a percentage for different types of open
spaces. 
However, it is not clear in the draft SG how to
identify/calculate the score of existing or proposed
open spaces, to determine whether they meet or
exceed the threshold score set out in Table 2. This
should be made clear. 
The Council has now made the scores of its 2018
Open Space Audit available online
(https://westdunbarton.maps.arcgis.com/apps/webap
pviewer/index.html?id=fe102759a63e4dfbb5251b214
00f058a) and an information note has been added as
an appendix to the Supplementary Guidance. 
Page 11 ‘Quantity standard’
There is a formatting error on page 11 below the
heading ‘Quantity standard’ – it is assumed that the
text in the box should be below the text in the first
paragraph. 
This formatting error has been corrected.
Page 11 ‘Quantity standard’
It is stated that “Development sites should provide
this quantity of open space [30 m2 per person] as a
minimum where the accessibility standard identifies a
The quantity standard has been amended to clarify
this point.
Page 197

Page 198

need based on an analysis of open space provision
for the wider area”. 
However this implies that the open space is always
required to be provided within the development site,
which seems to contradict the text in the box, which
refers to “access to” the open space. It also seems to
contradict the text under the heading ‘Accessibility
standard’ which states that the site appraisal/
assessment will inform what type of space, if any is
required within the development or if a financial
contribution to an existing space is more appropriate. 
These apparent contradictions should be addressed. 
Appendix 3: Developer contributions examples 
It would be useful to expand/revise the examples to
show exactly how they follow the process shown in
the flowchart in Appendix 1 (e.g. the application of the
questions regarding the accessibility and quality
standards). 
A Developer’s flowchart analysis has been added to
each example.
Appendix 3: Developer contributions examples –
Example 1 
It would be useful to expand the first example to show
how the ‘site appraisal’ method would be used to
determine the form of open space required to be
provided. 
The purpose of Example 1 is primarily to provide a
simple arithmetic example of calculating the open
space contribution based on the quantity standard.
However, additional information has been added to
explain that the calculated level of open space would
be required on-site in this example as the site is not
within 250m walking distance of an usable open
space.
Appendix 3: Developer contributions examples –
Example 3 
This typo has been corrected to amend the reference
to 250m.
Page 198

Page 199

The example refers to a financial contribution to
upgrade play equipment in a park less than 400m
walking distance. It is not clear whether/how this is
considered acceptable in relation to the ‘accessibility
standard’ which refers to a 250m walking distance.
This should be clarified. 
Appendix 3: Developer contributions examples –
Example 6, and explanation of Quality standard on
pages 10-11 
The example states that “the first step is to see if it
meets the accessibility standard i.e. is it within 250m
of a 0.2ha amenity greenspace, play space or
natural/semi-natural greenspace?” (emphasis added). 
The example then refers to a “park” within 250m of
the site. It states that “the play area is below the 50%
threshold and requires investment”. However, the
specified ‘Quality standard threshold score’ for ‘Parks
and gardens’ in Table 2 is 69%. It is not clear
whether/why there has to be a play space scoring
over 50% within 250m of the development site, if the
park scores at least 69%. This should be made clear.
Adding an explanation as to how the scoring system
works may help the reader to understand this. 
The appraisal shows that a play area within walking
distance of the site is below the quality threshold,
meaning that it is a valid and eligible project for
developer contribution funding. Additional wording
has been added to provide clarification.
There is no mention of historic environment assets so
suggest adding the following: 
On page 19, ‘Appendix 2: Green infrastructure
checklist’ consideration should be given to an
additional check box that states “identifies historic
environment assets and recognises their significance
in the site design”, within the ‘Site Analysis’ flowchart
Agreed, this change has been made.
Page 199

Page 200

blue box, under the ‘Site Appraisal’ section. This
would ensure the consideration of gardens and
designed landscapes, scheduled monuments and
The Antonine Wall (FRE) World Heritage Site and
recognise their contribution to green infrastructure.
RSPB
Scotland
. In general,  the guidance is welcomed and the onus
it puts on developers to protect and enhance the
green network and green infrastructure. 
Noted
Page 8 Green infrastructure function: habitat
enhancement
1. Some of the wording of the document might be
interpreted as suggesting that biodiversity protection
and enhancement should be identified and
considered, rather than actually delivered. It is
recommended that this wording be strengthened:
Replace:
“Proposals for new development should consider
whether the site can protect or enhance habitats to
safeguard existing networks or deliver new habitat to
connect fragmented networks.”
With
‘Proposals for new development must protect or
enhance habitats, to safeguard existing networks or
deliver new habitat to connect fragmented networks.’
This would still be valid even when there are no
significant habitat features on site, as the
development can progress whilst they remain
protected. 
A change has been made to ‘Proposals for new
development must consider whether the site….’.
The intention of this part of the supplementary
guidance is to show how the requirement of Policy
CP2e can be met. Policy CP2e does include the
stronger formulation “Development proposals must
protect, restore and enhance biodiversity habitat
networks, and environmental quality within and linking
to the site” and this guidance shows that
consideration of how this can happen as informed by
appropriate surveys. 
2. The document suggests that the Green Network
Blueprint developed by the Glasgow and Clyde Valley
Green Network Partnership should be used to identify
Agreed. This change has been made.
Page 200

Page 201

whether the site can protect or enhance habitats to
safeguard existing networks or deliver new habitat to
connect fragmented networks. The Blueprint does not
provide sufficient detail to do this and it is
recommended that the following be reworded:
Replace:
“This work should be guided by the Green Network
Blueprint developed by the Glasgow and Clyde Valley
Green Network Partnership, which details existing
habitats critical to the network and where connections
should be made to improve habitat connectivity.”
With
‘This should be informed by appropriate surveys and
assessment. The Green Network Blueprint developed
by the Glasgow and Clyde Valley Green Network
Partnership can provide strategic guidance on
habitats critical to the wider network and where
connections should be made to improve habitat
connectivity.’
Page 9 Table 1
They are concerned that the Matrix suggests that the
provision towards habitat networks is dependent on
whether there is a need or opportunity. It is  felt that
this could lead to confusion, particularly if the
intention of the guidance is that sites should be
enhanced for biodiversity, in which case a ‘need’
should already be established. It is unclear when a
site ‘needs’ to be enhanced and when does it not.
The wording should be amended to add clarity to this.
The matrix has been amended to indicate that habitat
provision/enhancement is required on residential
development sites of 10 or more houses.
Scottish
Environment 
The commitment to a green infrastructure first
approach to development is supported. Welcome the
measures therein to safeguard, enhance and expand
It is noted that Scottish Environmental Protection
Agency has not specific comments on this document
and the support for the green infrastructure first
Page 201

Page 202

Protection
Agency
existing networks and the connections between them
and support multi-functionality (e.g. by integrating
water management measures such as SuDS).
approach as well as the measures to safeguard,
enhance and expand existing networks are
welcomed.
Sportscotland The guidance and policies referenced within appear
to generally support, protect and improve green
space that (alongside other functions) provide
opportunities to engage in physical activity, sport and
recreation. 
The procedural approach towards green space
provision appears logical. In relation to outdoor sports
facilities specifically – such as pitches, playing fields,
golf courses, bowling greens etc – it‘s not clear how
demand for these will be accounted for when
assessing and providing for green space in new
developments or calculations for developer
contributions. It is understood that the Open Space
Audit 2016 (update 2018) will inform new green space
typology, provision and investment – based on need
and demand. They have not been able to access this
document. The previous Open Space Audit 2011,
which is available online, excluded some spaces for
sport (pitches) in the audit process. It’s not clear
whether this is the case in the revised document. The
planning and provision of places for sport and
recreation should be based on an up-to-date audit of
facilities alongside a strategic assessment of demand
and need for them. 
The 2016 Open Space Audit, like the 2011 audit, did
not include sports pitches (MUGAs were assessed).
Sports pitches are an eligible project for developer
contribution funding, although it is accepted that an
up to date sports pitch strategy would be beneficial in
allocating contributions towards these resources.
Strathclyde
partnership
for Transport
No comments Noted
Page 202

Page 203

Local
resident  First of all I shall make a comment on the
introduction. 
There are references here to the outstanding natural
environment being shaped by the area’s history,
boasting of our parks, woodland areas, designed
landscapes at Overtoun House, Kilpatrick Hills etc.
However these areas are largely out of bounds to the
local horse riders for various reasons.
Our area as so many others has been shaped by the
use of horses, without them there would be no
industry, no transport, nothing. Without horses
nothing was possible but yet today this has been
forgotten, our canal towpaths are dangerous, our
surfaces are unsuitable and our roads are dangerous.
We owe horses everything but there is seemingly no
place for them in our area, they have been forgotten. 
This council is laying down cobbles on our high
streets but is it even known why there were cobbled
streets in the first place - to stop the cart horses feet
slipping, these horses helped our industries flourish
and made transport possible. They are our heritage
and there should be a special place for our horses
within West Dunbartonshire. 
Look at places like London, public riding arenas in the
parks, bridleways in the parks what does West
Dunbartonshire have? Around half a mile of actual
designated bridleway if that (Auchnacraig estate) and
no parking access for horseboxes so we cant even
Whilst the comments support the benefits of
increasing facilities for horses and horse riding,
unfortunately the guidance document is not
considered to be the appropriate document for the
promotion of horse-riding and horse-riding facilities
that the respondent is seeking. 
Page 203

Page 204

get to use the tiny part of bridleway provided. Our hills
are gated and have unsuitable surfaces, steps and
unsuitable narrow bridges are everywhere, our riding
areas are built upon or inaccessible and to top it all in
our official documents such as this horses are not
even mentioned. 
There are many horse owners in the area, several
livery and private yards. Horse owners have immense
spending power, the equestrian industry is a huge
tourist industry and recreational industry not to
mention one of the most green forms of travel
possible, horses get people out of their houses and
into the outdoors and fresh air, they help with mental
health , it is a scientific fact that being around them
lowers your heart rate. 
We must promote horses and equestrian activity in
our area. We have great places to ride we just need
access to them before its too late and you build
everywhere. Horses can elevate our area from the
socially and economically deprived area it currently is. 
Most if not all horse riders have been involved in a
road traffic incident of some sort, I know I have, we
take our lives in our hands taking our horses out of
their fields and this council does nothing so I hope
you will take on board my comments and we can see
some changes being made.
Benefits of green networks and green infrastructure 
The following are listed as a benefit 
It is acknowledged that horseriding is another
recreational activity and sport that can benefit from
improved access to green infrastructure, however no
Page 204

Page 205

Off road active travel and recreation routes 
Locations for sport and recreation 
It goes on to say they are made more valuable when
they are multi functional and connected providing off
road routes 
This should be expanded to include reference to
horse related activities and access – not all sport and
recreation is football, walking or cycling. 
Horse riding is much more inclusive than many sports
as men and women compete on equal terms and
together, age and ability is no barrier either. Horses
can allow freedom of movement to those who cannot
have this on their own and horse riding makes places
more accessible than with wheelchairs.
single sport is singled out in this section, so no
change should be made in this regard. 
These comments are also relevant to the Creating
Places Supplementary Guidance and the respondent
has agreed they may be addressed in relation to that
consultation.
When paths are for multi users thought should be
given to all potential users and suitable surfaces
installed, designated bridleways could be installed -
these could be side by side with a “horse lane” or
suitable parking provided for horseboxes. Less use of
steps to allow better access for horses 
These comments are more relevant to the Creating
Places Supplementary Guidance and the respondent
has agreed they may be addressed in relation to that
consultation.
The access priorities mentioned currently have no
mention of equestrian access and access to many of
these places is impossible or limited at best. 
Kilpatrick Hills - gated and keys needed – when I
have enquired before about getting a key, yes I was
given it but I was originally told I had to hand the key
back in after my ride. I did manage to be allowed to
These specific issues raised in relation to equestrian
access are outwith the scope of this consultation.
They have been passed to the relevant service.
Page 205

Page 206

keep hold of the key however for most people with
less connections than I perhaps have mean the hills
are a no go area. On a rare nice day a horse rider can
not then try to get a key last minute especially when
this is likely to be a weekend, evening or at short
notice so in effect the hills are inaccessible. 
Surfaces of the Kilpatrick Hill paths. The lower
reaches are okay so if you got a key th, however if
you get as far as the Humphrey then the surfaces are
mostly unsuitable unless you try to stick to the grass
edges which is seemingly frowned upon. Rough stone
tracks are not suitable for the modern horse so im not
sure why these surfaces are so widely used. 
The John Muir Way is more or less impassable for
horse riders 
All licensed premises in the area should be contacted
for their opinions on horse access and should be
automatically given keys to gates areas each yr
without fail (if the gate system remains in place) eg
saltings, bowling, overtoun, auchnacraig, forestry
commission (ok hills) 
Bowling harbour - gated in evening and the other
route is unsuitably surfaced. Some paths are too
narrow and unsafe. Tarmacking paths is not always
the answer as more naturalised routes can be more
beneficial to use as a horse rider. Maintenance of all
areas needs looked at, shrubs cut back, fallen trees
removed, paths kept open and usable etc 
Page 206

Page 207

Forth and Clyde canal whilst the surface is suitable is
plagued by illegal quad and motor bikers making it a
volatile route at certain times. Nothing is ever done
about these bikes so although the route along canal
path taking in the saltings and bowling harbour and
beyond to Milton is well surfaced and suitable it is
sometimes unusable due to the dangers. There are
off roads routes running alongside that if maintained
properly (old railway line) could provide a safer option
or if the quad bike situation was policed it could make
the canal path route safer and more suitable.
Unsuitable bridges in certain parts - ie behind Hillview
nursing home – some of our rides are urban and
involve industrial estates as these are safe places in
evenings and weekends but are not often thought
about as such but again we need access as
sometimes these industrial areas have the most
green spaces or provide access to parks. 
Dalmuir park – no horsebox parking, no bridleway,
unsuitable bridges, limited access and unsuitable
surface at the path between park and golf course 
Levengrove park - no horsebox parking, no bridleway 
The Saltings parking is closed off to those with
horseboxes so only walkers and cyclists can use it.
This needs addressed as why have off road routes
when horse riders are effectively banned from its use
if we cant get there to ride. Bridges making shorter
circular routes not in use and seemingly no plans to
Page 207

Page 208

rectify. Some bridges unsuitable for horses (wooden
one with chevrons and no other crossing next to it is
one example). 
Auchnacraig estate - no suitable parking as locked
and gated cars can get in but not horseboxes.
Unsuitable and broken decking used to cover boggy
areas. Lack of signposting for out of town riders
showing routes to other areas. 
Horse riders have no safe route to Hardgate and the
hills, there is no horse crossing anywhere, there are
no off road routes and cut off by the A82. 
Overtoun estate – gated and locked and steps
everywhere making most of it inaccessible to horse
riders. 
Exxon development - no equestrian access thought of
at all - this could be like mugdock country park but no
nothing about equestrian access anywhere. 
Carless site - excellent opportunity here to link up
many local routes from old Kilpatrick, bowling and
Clydebank - again no mention of equestrian
usage/access 
Hardgate knowes – no equestrian parking or access
as far as im aware but not a place I ride as again I
cant get there so assume no one else can either. 
Whilst  applaud the plans to conserve routes and the
current infrastructure mentioned under KH1, G1I,
The approach set out in the Supplementary Guidance
is based on the Local Development Plan, and
Page 208

Page 209

ENV1, ENV2, ENV3, ENV4, ENV5, ENV6 and CON3 
need to do more and go further in regards to
enhancing and expanding the green network.
complements and is proportionate to that approach. It
would not be appropriate for the Supplementary
Guidance to go beyond what is included in the Local
Development Plan.
Green infrastructure function –  agree with this which
is mentioned on p8 however there is no mention of
horse access, equestrian facilities or connecting
currently used equestrian routes, do not assume that
because you don’t see horses or know nothing of
them that they are not present and using the area.
The section on access networks relates to all forms
on non-motorised access, whilst not identifying any
specific type. Therefore a specific reference to horse
access, equestrian facilities etc is not considered
appropriate. Reference to multi-user paths have been
added to the guidance.
Contributions could be used more effectively and
certainly should include equestrian access facilities.
You need to be aware of the local equestrian sites
and premises and plan accordingly. The people living
in new homes see horses as a local amenity and
children love to see them riding past or enjoy going to
see them at their fields but if you do not sort out the
correct access and facilities this will be lost.
Contributions made could be used to fund
improvements or to include equestrian access.
Where appropriate the Council will seek to develop or
require multi-user paths that would also be
appropriate for equestrian use. Reference to multi-
user paths have been added to the guidance.
Funding  is the reason our equestrian facilities are
sub standard so this is a chance to rectify it.
Equestrian facilities, as part of multi-user green
network projects, would be an eligible use of
developer contribution funding. However, this
document does not set out eligible projects.
The contributions from developers needs to be
extended to include non residential developments as
these are often on sites used by horse riders and are
the bigger areas giving more opportunity to get
funding for more appropriate paths etc ….Industrial
estates are useful and safe hacking areas at
weekends and evenings and winter nights.
The guidance does not seek developer contributions
from commercial or non-residential development,
where the focus is the provision of green
infrastructure within the development itself. This is
because this type of development is not considered to
increase user demand for the green network outwith
the development site in the same way that residential
development does.
Page 209

Page 210

The money being returned after 10 yrs if not used is
madness. This needs removed there cannot be some
usage to which the funding could be put – pathway
improvements for one to allow equestrian access –
the bridges at Saltings is another example to which it
could be put. Money should be used not returned.
It is considered that this retention period is
reasonable considering development timelines for
housing sites or the subsequent delivery of
associated green infrastructure projects. The
inclusion of a retention period will also encourage the
Council to make use of funds. Planning Circular
3/2012 does not specify a reasonable timeframe, it
therefore sits with the planning authority to fix one
that is reasonable. It is agreed that projects should be
delivered as associated with a given development
before this trigger is met.
Horses and biodiversity go hand in hand, you can
look at my field and see what the nature is like there.
Horses are not a barrier to nature and wildlife habitats
nor are they a nuisance not when proper access and
riding routes are provided to us. In particular it would
eradicate any perceived nuisance aspects of horse
riding in the area – riders on pavements in Hardgate –
they have no horse crossing nor proper access to
safe off road riding from their yards at Hardgate near
roundabout to the bridleway at Cochno. This could be
addressed by use of developer funding.
The document does not suggest that horses are a
barrier to nature/habitats, nor that they are a
nuisance. 
The purpose of this document is not to set out the
specific projects that developer contributions will be
spent on. However the comments made will be taken
into account when future projects are being scoped
out. 
Maintenance or stewardship is also an issue – grass
needs cut, paths cut into it is a useful feature for
horse access (this does take place at the small park
near golden jubilee hospital and its very useful, one of
the few things that actually helps horse access, there
is also parking here for horseboxes, and there is a 
need more of this elsewhere). 
Verges cut down allows horses to be off the main
parts of track in light of there not being an actual
The guidance includes a section on green
infrastructure stewardship, requiring that maintenance
arrangements are put in place for green infrastructure
associated with new development. 
Page 210

Page 211

horse track installed. Wide verges at side of roads
gets us off the roads too. This enhances safety for all
road and path users and also reduces hay fever
issues which does affect horses as well as people. 
Bridges need fixed or made more suitable (paths can
be created under or beside them in some cases) and
rubbish in particular glass needs removed more
regularly.
There is funding for off road access available from
British Horse Society and horse riders  if they could
get better off road access but funds need diverted to
some equestrian usage so please include it within this
document and future plans.
The supplementary guidance does not to set out
specifics on the types of projects that developer
contributions will be spent on. This information is set
out in the Developer Contributions documents
available on https://www.west-
dunbarton.gov.uk/council/strategies-plans-and-
policies/local-development-planning/other-guidance-
and-information/
Developer payments should be local to the
development and not used out of the area. They
should be of benefit to the people living in and around
that area and should only be used for some kind of
green space or access purpose and percentages
could be split up so its not all going to playparks, it
needs to be equal so it does not just benefit one
group of people. Right now horse riders are a
forgotten part of this so some money should be spent
on that initially to balance things up. Where people
can walk, horses can too, you just need to include the
horse riding aspect, they are not mutually exclusive. 
Where the money should be spent should be more
visible and perhaps up for discussion, more frequent
The Council has approved separate documents
explaining how developer contributions will be
allocated, monitored and reported https://www.west-
dunbarton.gov.uk/council/strategies-plans-and-
policies/local-development-planning/other-guidance-
and-information/
Page 211

Page 212

updates should be made, annually is not enough. I
can certainly put forward some suggestions that
would immediately assist horse riders in the area and
im willing to be part of any projects or discussions on
this perhaps with the access officer or greenspace
staff. It cant and shouldn’t all go to playparks and
community gardens.
On a wider note developers need to be stopped
pulling down the mature trees on site and replacing
them with tiny saplings, this doesn’t help with climate
change in any way and happens all the time. In one
example a block of flats,  over 300 trees were cut
down and they have been replaced with small shrubs
about 10 of them. These trees were all mature with
many in excess of 50 yrs old. This must be stopped,
developers can keep existing trees around
boundaries which makes the whole site nicer for
residents and better for wildlife but time and time
again everything is cleared and a blank site is the
starting point.The keeping of mature trees must be
enforced even the ones which seemingly are not in
best of health, even an unhealthy tree can live for
hundreds of yrs. I have 2 ancient willows on my
rented field and both grow almost horizontally, they
are still alive, no danger of falling over and are a
beautiful feature. 
Existing trees onsite must be kept and developers
must adhere to this. Climate change is important so
take actions to prevent it worsening.
These comments are more relevant to the Creating
Places Supplementary Guidance and the respondent
has agreed they may be addressed in relation to that
consultation. 
The Council is also intending to prepare planning
guidance (non-statutory) on trees which would cover
these matters.
Balconies are not an acceptable outdoor space,
gardens should be compulsory on all developments
These comments are more relevant to the Creating
Places Supplementary Guidance and the respondent
Page 212

Page 213

even if it means less buildings on site (no bad thing).
Who uses their balconies,  the ones on the main road
in Clydebank face on to a busy road, who is going to
sit out there with all the fumes from the road. Gardens
are a must not unusable balconies. Do remember that
this council has covered in most of these balconies in
recent years for safety reasons so don’t start putting
them in again instead of actual gardens.
has agreed they may be addressed in relation to that
consultation.
Page 213

Page 214

Page 214

Page 215

WEST DUNBARTONSHIRE COUNCIL
Report by Strategic Lead, Regulatory and Regeneration
Planning Committee: 16 November 2022
_____________________________________________________________
Subject: Planning appeal decision – coffee shop with drive-through,
Morrisons car park, 36 Glasgow Road, Dumbarton
1. Purpose
1.1 The purpose of this report is to advise the Committee that an appeal
relating to a Committee decision to refuse planning permission for a drive-
through coffee shop on part of the Morrisons supermarket car park on
Glasgow Road, Dumbarton has been dismissed.
2. Recommendations
2.1 It is recommended that the Committee note the outcome of the appeal.
3. Background
3.1 Planning application DC21/176/FUL for a drive-through coffee shop was
refused at Planning Committee on 8 December 2021. The reasons for the
refusal were that the proposed development was contrary to the
development plan as it would have a detrimental impact on Dumbarton
town centre, and as it did not prioritise active travel and would promote use
of the private car.
4. Main Issues
4.1 The applicant submitted an appeal against the refusal of planning
permission and a claim for award of expenses to the Scottish Government
Directorate for Planning and Environmental Appeals. The Council’s
Planning Service responded to the appeal and claim for expenses.
4.2 The appeal decision was published on 1 November 2022. The Reporter
dismissed the appeal and refused planning permission. In doing so, the
Reporter considered the main issues to be the effects on: the network of
centres in Dumbarton; traffic and transportation; the historic environment;
residential amenity; design; and economic benefits.
4.3 With regards to the network of centres, the Reporter accepted that, given
specific design requirements in relation to the drive-through layout, finding
a suitable site in the town centre had not been possible in this case.
However, the Reporter found there to be insufficient evidence to
ITEM 8
Page 215

Page 216

demonstrate that the proposal would not undermine Dumbarton town
centre, or that its function would complement other centres within the
network of centres, specifically the town centre and Dumbarton East.
4.4 On traffic and transportation, the Reporter found that whilst adequate
provision appears to have been made for pedestrians and cyclists, the
development would not maximise the extent to which travel demands are
met through walking, cycling and public transport.
4.5 The Reporter found that the proposed development would not affect the
special interest or setting of the adjacent C-listed church and that impact
on residential development could be adequately controlled by planning
conditions. The design of the proposed building was found to be of a high
quality and respecting its surroundings. The employment and economic
benefits of the proposal were also recognised by the Reporter.
4.6 On balance, the Reporter found that the positive benefits of the proposal
did not outweigh concerns relating to impact on the town and local centre.
4.7 The appellant’s claim for expenses was also dismissed.
5. People Implications
5.1 There are no people implications associated with this report.
6. Financial and Procurement Implications
6.1 There are no financial or procurement issues associated with this report.
7. Risk Analysis
7.1 There are no risks associated with this report.
8. Equalities Impact Assessment (EIA)
8.1 There are no equalities issues associated with this report.
9. Consultation
9.1 Consultation was undertaken during the consideration of the planning
application.
10. Strategic Assessment
10.1 The Council decision on this planning application is considered to have
been consistent with the following strategic priorities:
Page 216

Page 217

• Our Environment - Greener Future strategic - with regard to
supporting sustainable travel
• Our Economy – Strong and Flourishing – with regard to supporting
local businesses.
Pamela Clifford
Planning, Building Standards and Environmental Health Manager
Date: 16 November 2022
_________________________________________________________________
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager
pamela.clifford@west-dunbarton.gov.uk
Alan Williamson, Development Planning & Place Team
Leader
alan.williamson@west-dunbarton.gov.uk
Appendices: None
Background Papers: Report to Planning Committee, 8 December, 2021 –
DC21/176/FUL - Proposed coffee shop with drive-
through facility etc at Morrisons Supermarket, 36
Glasgow Road, Dumbarton
Planning appeal decision -
https://www.dpea.scotland.gov.uk/Document.aspx?id=
895680
Wards Affected: Ward 3
Page 217