Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
Planning and Environmental Appeals Division
Appeal: Notice of Intention – EIA Development
T: 0300 244 6668
E: dpea@gov.scot
 
Notice of Intention 
For the reasons given below I am minded to allow the appeal and grant planning
permission in principle subject to the 39 conditions listed in Schedule 1 of the notice and
following the signing and registering or recording of a planning obligation under section 75
of the Town and Country Planning (Scotland) Act 1997, or some suitable alternative
arrangement, securing a bond sufficient to cover the expected restoration and aftercare
works for the quarry extension. 
The appellant made a claim against the council for the award of its expenses in making this
appeal.  I will deal with that claim at the same time as determining the appeal 
Background 
1. The planning application to which this appeal relates was made in 2002 and
determined by the council in 2021.  It will therefore be helpful to explain the context in which
the appeal has been made. 
2. Planning permission for Sheephill Quarry was first granted on appeal by the
Secretary of State for Scotland in 1949.  In the late 1960s Dunbartonshire County Council
granted planning permission for a residential development at Milton Hill.  These houses
would be (and now are) close to the western edge of the consented extraction area.  It
appears that the quarry may not have been operational at that time and the County Council
was perhaps not cognisant of the full terms of the permission for the quarry when it
approved the housing development. 
3. In 1997 West Dunbartonshire Council gave notice, under the statutory arrangements
for the ‘Review of Old Minerals Permissions’ (ROMP), that the quarry was an active site 
Notice by David Liddell, a Reporter appointed by the Scottish Ministers 
 Planning appeal reference: PPA-160-2034
 Site address: Sheephill Quarry, Milton, G82 2RN
 Appeal by William Thompson & Son (Dumbarton) Ltd against the decision by West
Dunbartonshire Council
 Application for planning permission DC02/447 dated 28 March 2003 refused by notice
dated 26 March 2021
 The development proposed: Quarry Extension
 Application drawings: see Schedule 2 of this Notice
 Date of site visit by Reporter: 31 August and 26 November 2021 
Date of notice:   18 January 2022

Page 2

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
2
and an application must be made to provide for new planning conditions for the quarry. 
Around this time the close proximity between the houses at Milton Hill and the edge of the
consented extraction area became apparent. 
4. It seems that the quarry operator and council officers then discussed how to resolve
the potential conflict between extraction at the quarry and housing in close proximity.  It was
proposed that the quarry operator would forego its rights to extract the westernmost part of
the quarry (the part closest to the houses at Milton Hill – ‘the excambion area’) in return for
a proposal to extend the quarry to the northwest – the extension area which is the subject
of this appeal.  Not working the excambion area would preserve a distance of about 150
metres between the quarry workings and the houses at Milton Hill.  Therefore there were
two concurrent planning applications – one for the ROMP (where council officials
recommended a condition preventing extraction in the excambion area) and one for the
proposed quarry extension.   
5. Councillors had been minded, in 2005, to approve both applications subject to a
planning agreement to ensure restoration of the land in the extension area following
extraction.  However it seems that the applicant could not obtain all the necessary consents
for the agreement, so it could not be entered into.  Both applications remained dormant
until, in 2019, the land ownership issues seem to have been resolved.   
6. Given the long hiatus between the council’s initial consideration of the applications
and their resurrection in 2019, the council re-notified the neighbouring properties of the
applications in 2020.  A number of letters of representation were made in respect of the
applications.  Both applications then went back to the planning committee and then to a full
meeting of the council in 2021.  The council approved the updated ROMP conditions (one
of which precludes extraction in the excambion area) but refused the application for
extraction in the extension area.  The current appeal is against that refusal. 
7. An EIA Report (as we would now call it) was submitted with the 2003 application. 
This addressed the environmental effects of operating the quarry on the working
assumption that the proposed extension area would be worked instead of the excambion
area.  Prior to the applications being determined in 2021 updated environmental information
had been provided on ecological effects (2021) and effects from noise and vibration (2020). 
8. The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2011 were replaced with new EIA regulations in 2017.  However because of
the date the original application was made the statutory position is that it is the 2011
Regulations, as they applied on the day before the 2017 Regulations came into force, which
have force for this appeal.  As an extension to a quarry, Schedule 2 of the 2011
Regulations identifies the appeal development as EIA development. 
9. Following my initial review of the evidence before me and immediately after my
accompanied site inspection, on 1 September 2021 I issued a request for further evidence
on a number of matters.  All of those who had made representations to the council in 2020
and who had, by 1 September 2021, made representations to DPEA following the appeal
were included in that request. 
10. As part of that exercise, I asked the appellant to clarify which environmental effects,
if any, the EIA Report identifies as significant.  I also asked the appellant to update the
landscape and visual assessment in the EIA Report, including visualisations and other

Page 3

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
3
supporting information in line with currently available technology and good practice.  That
additional information was subject to publication, consultation and neighbour notification in
accordance with the requirements of the 2011 Regulations.  Since updated assessments
had recently been submitted on ecological effects and on effects from noise and vibration, I
did not ask for further updates in relation to these matters. 
11. I am required to examine the environmental information, reach a reasoned
conclusion on the significant environmental effects of the proposed development and
integrate that conclusion into my final decision.  In that respect I have taken the following
into account: 
 the EIA report submitted to the council on 21 March 2003;
 the additional information submitted to the council in 2021 on ecological effects and
in 2020 on effects from noise and vibration;
 consultation responses from internal and statutory consultees made to the council in
2019 and 2020;
 representations from members of the public made to the council in 2020 and to
DPEA following the appeal;
 the response to my 1 September 2021 request for further evidence; 
 responses to my subsequent request for further evidence in relation to noise effects;
and
 the additional information on landscape and visual effects provided by the appellant
at my request, and the subsequent comments on this information following its
publication and notification to neighbours of the site. 
Reasoning 
12. I am required to determine this appeal in accordance with the development plan,
unless material considerations indicate otherwise.  The development plan comprises the
Glasgow and Clyde Valley Strategic Development Plan and the West Dunbartonshire Local
Plan 2010.  I have not been directed to any provisions of the Strategic Development Plan
as having a significant bearing on the appeal. 
13. The council had, following its examination, proposed to adopt a replacement local
development plan in 2016 but ultimately chose not to do so for reasons which are not
relevant to this appeal.  The council has a new 2020 proposed local development plan,
modified after its examination.  The council intends to adopt the 2020 plan but the Scottish
Ministers have directed it not to do so until certain changes (again unconnected to the
appeal proposal) are made to it.   
14. In my view the modified 2020 plan, having been found to be suitable for adoption
insofar as it relates to the appeal proposal, can be treated as an important material
consideration and as representing the council’s most recent policy position.  Having never
been adopted and now, in effect, replaced by the 2020 plan by having reached an
equivalent stage, I see little justification for paying regard to the policies of the 2016 plan. 
15. Sheephill Quarry lies to the east and northeast of the village of Milton.  It is accessed
from the Dunglass Roundabout on the A82 trunk road, which lies to the south.  There is a
large quarry void, but much of the area which would be extracted under the 1949 consent is
yet to be worked.  This includes most of Sheep Hill itself, which is to the southeast of the

Page 4

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
4
current void.  Auchentorlie Wood lies to the south of the quarry, between it and the A82. 
The excambion area covers the northwestern corner of Auchentorlie Wood, with the houses
at Milton Hill lying immediately to the southwest and downhill of this area. 
16. Greenland Farm (in the same ownership as the quarry) lies to the northeast of the
quarry.  To the northwest of the quarry void is the proposed extension area.  The access
track to Greenland Farm, a core path, runs along the northern part of the appeal site.  The
track continues westwards, downhill to join Milton Brae where the houses of most of the
objectors to the appeal are located. 
17. The excambion area is 2.33 hectares in size of which, says the appellant, an area of
1.76 hectares would be extracted if it were to be worked.  The size of the extension area is
1.53 hectares with a proposed extraction area of 1.07 hectares.  The appellant advises that,
although less rock could be won from the extension than from the excambion, it would
facilitate the removal of more rock from the main quarry area.  Overall, if there was to be a
‘swap’ the net effect would be that an extra 0.93 million tonnes of rock could be extracted.   
18. The council refused permission for the quarry extension, against the advice of its
planning officials, because it was ‘unacceptable because of the effect it would have on the
amenity of the area and the residents of nearby property’.  In responding to the appeal, the
council identifies a number of policies (none of which feature in the reason for refusal) in the
2010 local plan (and in the 2016 and 2020 plans) which it says the development would not
comply with.  This is because of its landscape and visual effects (including on the setting of
the Kilpatrick Hills), loss of high grassland, effects on residential amenity and disruption to
core path users when the core path would need to be closed during blasting.  The council
also identifies amenity concerns should the ownership of Greenland Farm become divorced
from that of the quarry.   
19. The appellant argues that there would be no significant landscape, visual,
environmental or amenity effects arising from the proposed quarry extension.  The proposal
fully complies with the development plan.  Its swap with the excambion area would,
although extraction there would be technically feasible, avoid the significant effects on
amenity and natural heritage, and the landscape and visual effects, which would inevitably
be caused by extraction there.  Greenland Farm would remain in the same ownership. 
20. To supporters of the appeal it offers the opportunity to exchange the prospect of
extraction at the excambion area, which would bring noise, vibration, dust and other
disruption much closer to their homes at Milton Hill, for extraction at the appeal site which is
much further from any homes and so would have much lesser adverse effects.  They also
point to the adverse ecological effects if the part of Auchentorlie wood (part of a local nature
conservation site) which lies in the excambion area were to be subject to extraction. 
21. Objectors to the appeal do not consider that there need be any such swap, and
doubt that the excambion area would ever be worked.  There would be landscape and
visual effects and a loss of residential and wider amenity from extraction in the extension
area.  The new woodland to the north of the extension area, planted since the applications
were considered by the council in 2005, is not referred in the EIA Report, and the 2021
ecological update is said to be insufficient.  The objectors also point to the effects on the
core path and on the operation of neighbouring farmland during blasting.  Bowling and
Milton Community Council shares these concerns, stating also that reducing visitor
numbers to the area would affect local businesses.

Page 5

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
5
22. It seems to me that the first issue I must address is whether or not I should consider
the proposed quarry extension on its own merits, or instead consider it as part of a package
along with the accompanying benefits of avoiding certain adverse effects by not extracting
in the excambion area.  In my view it is the merits of the appeal proposal alone which I
should place greatest weight on.   
23. This is primarily because the ROMP consent already precludes extraction in the
excambion area.  So the current position is that extraction cannot take place there.  Any
decision I take on this appeal would not change that.  An appeal has in fact now been made
against the condition of the ROMP consent which precludes extraction in the excambion
area.  However I still understand the appellant’s position to be that, if I allow the appeal, it
would not pursue any proposal to extract in the excambion area.  Regardless of my
decision in this appeal, if the ROMP appeal is not withdrawn and requires to be determined
it will be for the reporter appointed for that appeal to decide the case on its merits. 
24. The appellant has said that it might seek compensation from the council because the
ROMP conditions now limit the amount of material that could otherwise have been
extracted under the terms of the 1949 consent.  But I deem that to be a matter for the
appellant and the council rather than a prospect (the outcome of which cannot be known)
which has a bearing on the planning merits of the appeal proposal. 
25. Therefore, having regard to the provisions of the development plan, the
environmental information before me and the views expressed in the written evidence, the
other main issues I address in this notice are: 
 The need for the proposed development
 Landscape and visual effects
 Effects on residential amenity, including due to noise effects
 Effects on core path users
 Ecological effects 
The need for the proposed development 
26. Policy DC 8 – Minerals of the 2010 local plan presumes against mineral extraction
within or adversely affecting areas which have been identified as important for nature
conservation, landscape conservation or built heritage.  Elsewhere, one of the criteria
against which applications are to be assessed is a justification of the need for the extracted
material within the regional market area. 
27. I asked for further evidence on this matter, and take account of the responses
received.  I do not read the above policy as presuming against any mineral extraction in the
green belt.  If that had been the intention, I would expect that to have been stated in more
certain terms.  Green belts are, according to the local plan, to serve a number of purposes
so I think it would be too narrow (and for the reader of the plan it would leave too much to
interpretation) to consider them to be one such ‘area’ listed in the policy.  In any event, I
take account of the ecological, landscape and visual effects of the proposal.  There are no
important built heritage assets which would be significantly affected.

Page 6

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
6
28. The Kilpatrick Hills are identified as a Regional Scenic Area in the local plan and
therefore would in my view reasonably be considered to be an area identified for landscape
conservation, applying the terms of DC 8.  I return to landscape and visual effects below. 
29. But for the meantime the second part of policy DC 8, including the need for the
material to be extracted, is relevant.  The appellant’s position is that it is the proposed
surrender of the excambion area which establishes the need for the extension area to
replace it.  In the context of the discussions the appellant has had with council officials that
is an entirely reasonable position to adopt.  Although I find above that, for the most part, I
must consider the appeal proposal on its own merits, I do also keep in mind that that
proposed swap was a driver for the making of the extension proposal in the first place. 
30. However I do not have any detailed evidence before me from any party as to
whether the landbank (as referred to by the appellant) of consented mineral reserves is
deficient.  Therefore, applying one of the criteria of DC 8 to the proposal before me, the
evidence does not show whether or not there is a need for the appeal proposal ‘within the
regional market area’.   
31. The appellant points to a previous appeal decision (PPA-160-2022) at the nearby
Dumbuckhill Quarry.  In that proposal the reporter appears to have accepted a continuing
need for working the quarry without having detailed evidence as to need.  However that
proposal appears to have been, in effect, to work the quarry to a different profile than the
previous consent.  The reporter seems to have been addressing the question of whether it
could be the case that there was no longer a need for the quarry at all.  That is different
from the circumstances of the appeal proposal, which is to extend a quarry. 
32. Local plan policy GB 1 Green Belt presumes against development, with certain
exceptions.  One of these is where there is a specific locational requirement and
established need for the development and it cannot be accommodated on an alternative
site. 
33. I agree with the appellant insofar as minerals can only be worked where they are
found, so there is a specific locational requirement.  I presume the reference in GB 1 to ‘an
alternative site’ is intended to mean an alternative site outwith the green belt.  I don’t have
information about what other such alternative sites might exist but, in any event, I don’t
think it would appropriate to apply this test to a proposal to extend what is a long
established quarry which provides part of the reserve of construction aggregates for the
wider area.  However, again I find that there is no clear evidence as to whether or not there
is a current need to work the reserves on the appeal site. 
Landscape and visual effects 
34. Policy E 9 Landscape Character of the local plan says that development in the green
belt must have particular regard to the landscape character and distinctiveness of West
Dunbartonshire and adjoining areas.  Proposals should positively contribute to conservation
or regeneration of these landscapes.  Proposals which are detrimental to the landscape
character will not generally be supported unless they are supported by other local plan
policies. 
35. Policy GB 1 Green Belt says that development which has an adverse effect on the
landscape character of the local area will not be permitted.  Green belt policy aims to

Page 7

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
7
protect the character, landscape setting and identity of the urban area, particularly where
settlements are at risk of coalescence.  Policy GD 1 Development Control requires
development to respect the character of the area in which it is located. 
36. As I explain above, I asked the appellant for updated visualisations and other
material to describe and illustrate the expected landscape and visual effects of the
proposed extension.  The original EIA Report, and indeed the additional information, seek
to assess such effects in combination with the corresponding reduction in overall effects
from the quarry which would be the case if the excambion area is not extracted. 
Development of the quarry including extraction of the excambion area is described as the
‘Permitted Development’.  However, as I set out above there is no current consent to
extract in the excambion area. 
37. The 2011 Regulations require me to consider the effects of the appeal proposal
alone and in combination with other development.  The most relevant other development in
this case is the extraction of the other parts of the quarry.  Some objectors are critical of the
quality of the updated landscape and visual assessment.  I agree that the visualisations
could perhaps have been rendered in finer detail.  And the analysis does not seem to offer
a view on the significance of the effects of the extension in combination with the
development of the rest of the quarry as currently permitted.  Despite this, I am satisfied
that the updated assessment provides me with sufficient information to reach a view on the
likely significant landscape and visual effects of the development. 
38. In respect of landform I accept that the size of the extension area may be quite
modest, but the effects of deep extraction and the formation of terraces would, at the level
of the site itself, be dramatic.  Considering the extension alone I agree with the updated
assessment that the improved grassland landcover of the site is not particularly sensitive. 
39. The updated assessment identifies the site as being within an area of rugged
moorland landscape character.  I have not been provided with a map showing the full extent
of this area of rugged moorland.  However the Kilpatrick Hills, which extend for several
kilometres to the north and east, could reasonably be described as rugged moorland of
similar character to the appeal site.  The effects on landscape character of the quarry itself
would be to change that from rugged moorland to a working (and then restored) hard rock
quarry.  However, that effect would be very localised.  Albeit the quarry would be visible
from elsewhere within the Kilpatrick Hills, given the extensive size of this area there would
not be a significant effect on its landscape character or on the landscape setting of the hills. 
In this respect I see no significant conflict with policies E 9, GB 1 and GD 1 of the local plan. 
40. Turning to visual effects, the updated assessment provides visualisations from eight
representative viewpoints.  Seven of these are in the area to the west and north of the
quarry and at fairly close proximity to it.   
41. Viewpoint 8, on the other hand, is on the southern side of the Clyde at Erskine Golf
Club.  Considering the visual effects of the extension alone, the distance from this location
and the screening by Sheep Hill would render the effect insignificant.  But the
photomontage of the extension with the rest of the quarry extracted shows a much greater
magnitude of cumulative effect, which would be significant.  I would observe, however, that
this view directly across the river from the quarry is likely to be have the greatest magnitude
of combined effects from any location on the south side of the river.  Similar views would be
possible from Marr Hall Hotel and, if only glimpsed occasionally through woodland, from the

Page 8

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
8
footpaths near this location.  Views of the extension itself are likely to be more appreciable
from further west along the southern shore of the Clyde, for example from the A8 at
Langbank and on the stretch of the road east of junction 31.  Again I think the cumulative
effects would likely be significant from these locations.   
42. It seems that from viewpoint 7, on the A82 at Milton, the extension development
would not be visible.  It would be visible from viewpoint 5, slightly to the north on Milton
Brae.  But the photomontage shows only minor re-profiling at the site in this view, which I
accept would not be significant.  Viewpoint 3 is further north again on Milton Brae.  Although
closer to the site the view of the development is still a partial one, and for only a short
stretch of the road.  I accept that it is below the level of a significant environmental effect.   
43. I take a different view in respect of visibility from the core path.  Travelling east from
Milton Brae on the path, views of the extension development would become fuller and
closer.  Albeit the photograph from viewpoint 2 at Mattockhill is cluttered by trees in the
foreground, my judgement from my site inspection is that, walking towards the extension
development in such close proximity the visual effects would be significant, especially if
machinery and activity in the quarry is visible in the view ahead.   
44. I think there would also be significant effects for walkers heading west and then
south on the path towards viewpoint 1.  Clear views would seem likely to be available down
towards the extension.   
45. I also disagree with the updated assessment about the visual effects from Middleton. 
I think that the topographical change where the top of the ridge at the end of the extension
would be lowered would be a significant visual effect.  However I do note that this viewpoint
is not a publicly accessible location.  Even at Viewpoint 6 (Dunbowie) I would say the same
effect would perhaps be significant, albeit this does not appear to be a well-visited or easily
accessible location.   
46. It can be seen that I find that, in term of the EIA Regulations, there would significant
visual effects from the appeal proposal, including in combination with the effects of
developing the remainder of the consented quarry.  However the extent of visual effects
from the extension alone would be experienced in a limited number of locations in close
proximity to the site, as I find above.  I do not find these effects to be so severe or
widespread that they would fall foul of the requirements in policies E 9 and GB 1. 
47. The site is not within the area identified as the Kilpatrick Hills in policy RSA 1 of the
local plan.  Therefore this policy does not directly apply in this case.   
Effects on residential amenity 
48. The potential effects on residential amenity from the appeal proposal are noise,
vibration (from blasting) and dust.  The closest receptors are the houses along Milton Brae. 
49. Local plan policy DC 8 – Minerals requires that the impact of the proposal on the
amenity of local properties be considered.  As the supporting text to policy DC 8 points out,
Planning Advice Note (PAN) 50 provides advice on controlling the environmental effects of
surface mineral workings.

Page 9

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
9
50. In respect of residential amenity, the council’s response to the appeal says the
following: 
‘If the proposed development is permitted, there will inevitably be significant noise from the
operation of the extension to the quarry.  That noise will be generated by the working of the
quarry and by the vehicles used to transport the excavated material.  The blasting will lead
to ground borne vibration as well as airborne vibration.  Dust generated at the extension
area is likely to be blown and deposited at the nearby properties. There will be a significant
increase in noise, vibration and dust for properties which are near the area of the
extension.’ 
Noise 
51. Annex A of PAN 50 covers noise (excluding noise from blasting).  It recommends a
model for the prediction of the likely level of noise emissions from proposed minerals
development and a method for setting noise limits for incorporation into planning conditions.   
52. Annex A (whilst commenting that each case should be considered on its merits) says
that the nominal daytime limit at noise sensitive properties should normally be 55 dB
(decibels) LAeq,1hr.1  The PAN goes on to state that a lower nominal daytime limit might be
appropriate in quieter rural areas if a limit set at 55dB would exceed the existing
background noise levels by more than 10dB.  This lower level should not normally be below
45dB, since this may be difficult to achieve and such a limit should prove tolerable to most
people in rural areas.  The night-time nominal limit should be 42dB.   
53. The appellant’s updated noise assessment makes predictions of operational noise
which are stated to be worst case because they assume plant working at the closest point
and/or highest topographical level to receptors and assume ideal meteorological conditions
for sound propagation.  The background noise levels measured in the earlier 2003 noise
assessment are used.   
54. The council’s proposed noise limits for the quarry extension are almost identical to
those specified in the equivalent ROMP condition.  The principal difference is that, at
Middleton, the allowable limit when drilling the upper bench of the extension would be 48dB
rather than the 45dB limit which would normally apply.  The council also confirmed that
these limits are intended to be applied using the LAeq,1hr noise index. 
55. My procedure notice asked for further evidence on a number of matters in relation to
noise effects.  Like the Milton Brae residents I remain doubtful that I can place great
reliance on the 2003 Mattockhill noise surveys as an indicator of current background noise
levels at Middleton given the age and short duration of the survey and the distance between
the two locations.  However I accept the point made by the appellant that the measured
noise levels are only marginally above (by 1dB) the level which would result in the lower
45dB noise limit identified in PAN 50 being applied.  This lower limit is indeed used for                                                 
1 LAeq is an A-Weighted noise index used to describe the equivalent continuous sound level - the sound level
of a steady sound having the same energy as a fluctuating sound over a period of one hour.  Normal hearing
covers the frequency (pitch) range from about 20 Hz to 20,000 Hz but sensitivity is the greatest between
about 500 Hz and 5,000 Hz. The A-Weighting is an electrical circuit built into noise meters to mimic this
characteristic of human hearing. [Definition adapted from PAN 50 Annex A]

Page 10

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
10
Middleton other than when drilling the upper bench of the extension, as noted above.  The
limit applied in the early morning and in the evening would be 42dB.   
56. Noting the worst-case nature of the predictions, the short duration of drilling to the
upper bench, the relatively low limit of 48dB in absolute terms and that the lowest PAN 50
derived limits would apply at all other times, I am satisfied that the overall level of noise
effects experienced at Middleton would not be significantly adverse.  The Milton Brae
residents, in responding to my procedure notice, carefully applied the advice in the
technical annex to PAN 1/2011 Planning and Noise.  Whilst I accept this was a reasonable
exercise to undertake, annex A of PAN 50 remains extant and is the most directly relevant
source of Scottish Government advice relevant to the noise effects from mineral workings. 
Both the ROMP noise condition and the council’s proposed noise condition for the appeal
development are based on the advice in the PAN.  I do not see a strong reason to depart
from that advice, which would ensure a consistent approach to both sets of conditions. 
57. I also asked about the likely noise effects at properties on Milton Brae closer to the
extension area than Middleton.  In responding, the appellant reproduced the results of
background noise monitoring in this vicinity (undertaken for Dumbuckhill Quarry) which
appear to show that there is a higher level of background noise further south along Milton
Brae than at Middleton.  The conclusion that noise from the quarry extension would, at
these locations, be well below (even when drilling) the PAN 50 derived limits appears
reasonable, and it has not been challenged by any other party.   
58. At Greenland Farm, predicted noise levels from the proposed extension are below
the background noise measurements used in the assessment, and also below the upper
PAN 50 55dB limit which would apply.  Noise levels from the extension would also be below
background levels at the two other proxy receptors – 9 Milton Hill and Auchentorlie. 
59. I do not find that the updated noise assessment is inconsistent with the advice in
Annex A of PAN 50.  Ultimately, subject to the proposed noise condition which sets noise
limits which I find to be appropriate and with which the quarry operations must comply,
council environmental health officers did not object to the proposal.  The statement in the
council’s response to the appeal is a very generalised one which does not draw support
from or refer to either the technical evidence on noise or the advice of its own officials.  I
take note of the evidence from the Milton Brae residents but I do not think that it identifies a
likelihood of significant adverse noise effects.  Overall, I find no conflict with policy DC 8. 
Vibration 
60. The council proposes a number of conditions which would control blasting in the
extension area, identical to those now imposed in the ROMP permission.  Proposed
condition 12 would require that ground vibration from blasting does not exceed a peak
particle velocity of 6 mm/s in 95% of all blasts (with no individual blast to exceed 12 mm/s)
as measured at any nearby vibration sensitive property.  These limits are in accordance
with the advice in the February 2000 Annex B of PAN 50.  There would be no blasting
outwith the hours of 10am to 4pm, nor on weekends or bank holidays. 
61. Other than at Middleton Farm, predicted vibration levels from the extension would be
below those predicted from working the other parts of the quarry.  Albeit there are no
predictions for the closer properties on Milton Brae, the predictions for Middleton (a mean of
2.1 mm/s) are much lower that than that required by the condition.  There is no technical

Page 11

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
11
evidence before me which indicates that blasting from the extension area would cause
vibration at problematic levels for any nearby properties.  Therefore it does not appear likely
that the vibration levels in the proposed condition would be breached.  In the event that they
were breached the condition would itself provide a means to address this.   Therefore I do
not find any conflict with the requirements of policy DC 8. 
Dust 
62. PAN 50 does not provide any recommended limits for dust deposition as it does for
levels of noise and vibration.  There is no detailed evidence to the effect that dust from the
proposed extension would cause a significant effect at any nearby properties, and no
objection from the council’s environmental health officials.  Conditions 17 and 18 (identical
to the equivalent conditions in the ROMP consent) would aim to ensure the extension area
is operated so as to minimise the release of dust.  Therefore I do not find any conflict with
the requirements of policy DC 8. 
Greenland Farm 
63. The council identifies a particular concern about amenity at Greenland Farm should
its ownership become divorced from that of the quarry.  The appellant says that would not
happen whilst the quarry remains operational but I do not take that as a guarantee.  I note
that the applicant’s recycling business already seems to make use of land at the
farmhouse.  Of more direct relevance, the existing quarry is already fairly close to the
farmhouse.  The proposed extension would not take extraction closer to the house than the
existing quarry void, indeed extraction would proceed westwards, generally away from the
house.  Therefore I do not find there to be a strong basis for concerns about any significant
effects on residential amenity at Greenland Farm. 
Effects on core path users 
64. One of the criteria identified in Policy DC 8 Minerals of the 2010 local plan is impacts
on ‘sport and recreation interests’, which could include impacts on path users. 
65. The quarry extension at its northwestern edge would come close to the core path. 
However the extraction area would be set back so that for the most part there would be no
direct conflict with path users.  The exception to this would be when blasting was taking
place, when the path would have to be closed before and during each blasting event.   
66. The appellant advises that blasting at the quarry takes places about once a month,
and that this involves closure of the path for about twenty to thirty minutes.  It is stated that
this would continue to be required even without the extension.  The proposed conditions on
blasting would avoid closure of the path in the evenings, weekends and public holidays
when one might expect greatest use would be made of it.   
67. I acknowledge that there might be increased levels of noise and dust for path users
in the vicinity of the proposed extension, but this would only be for a fairly short stretch of
path and I do not think this is likely to be a significant deterrent to users of the path.  Annex
A of PAN 50 advises (paragraph 42) that footpaths should not normally be regarded as
noise-sensitive.  I identify above the significant visual effects from stretches of the path but I
do not think these would be so severe or extensive so as to create any significant conflict
with policy DC 8.

Page 12

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
12 
Ecological effects 
68. Policy E 1 Biodiversity Duty in the local plan says that the council will further the
conservation of biodiversity when exercising its planning functions.  Reference is made to
the biodiversity duty placed on the council by the Nature Conservation (Scotland) Act 2004. 
Policies GD 1 and DC 8 require effects on the natural environment to be taken into account.   
69. Chapter 8 of the EIA Report covers ecology.  The appellant’s Phase 1 habitat survey
identified the appeal site as semi-improved acid grassland and scattered bracken and being
generally of low ecological value.   
70. The appellant’s ecological update, following a further site walkover in 2021, noted
that the habitat type and management of the land had not changed since the original
survey.  No signs of badger were found (consistent with the findings of a previous badger
survey in 2004).  The only sensitivity noted in the update report is the need to take account
of any effects on ground nesting birds, depending on when the site is first cleared.  This
could be controlled by a planning condition. 
71. In responding to the appeal the council refers to a loss of ‘high grassland’.  Like the
appellant, I am not familiar with this descriptor.  I agree with the appellant that the semi-
improved grassland and areas of scrubby bracken on the site are of no notable ecological
value.  Objectors are critical of the brevity of the ecological update.  However I am satisfied,
given the lack of change of the habitats on the site, that it is sufficient to enable me to
determine the effects of the development.  All told, the low ecological value of the site
means that I am satisfied that the above policy requirements would be met.  There would
be no significant effects on biodiversity. 
Other matters 
72. Objectors identify that agricultural operations in the farmland to the west of the
extension would be affected by the proposed extension.  However this farmland already lies
close to the working quarry and I do not see a strong reason for believing that there would
be significant conflict between such uses.  The community council is concerned about loss
of visitors to the area but I do not consider that extending the quarry, despite the effects I
identify, would be likely to have a significant effect in this regard. 
73. The appellant’s appeal statement states that the western quarry faces are
excessively high and that developing the extension area would be beneficial in ensuring
safe and stable slopes.  However I have not been provided with any detailed evidence
which would allow me to take great account of any such benefits.  It has not been put to me
that the quarry would otherwise be unsafe, or that further working of the quarry would be
the only means to address this issue. 
74. Objectors note that there would be a financial benefit to the appellant in working the
extension area instead of the excambion area, since overall more minerals could be
extracted in the former situation rather than the latter.  I find above that my primary concern
must be with the effects of the appeal proposal on its own right.  I do not consider that any
financial benefit for the appellant is a material consideration counting against the proposal.

Page 13

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
13
75. The EIA Report assesses other impacts relating to hydrology and hydrogeology,
access and traffic, cultural heritage, climate and material assets.   The council did not
identify any such impacts in its reasons for refusal and, subject to the imposition of
appropriate conditions, I am satisfied that no additional significant environmental effects
would occur. 
Conclusions 
The development plan 
76. Drawing on my findings above, in respect of the statutory development plan I find
that there is a lack of detailed evidence as to the need for the extracted material within the
regional market area.  There is therefore some tension with policy DC 8 Minerals, albeit the
need for the development is one of several considerations – the policy does not explicitly
state that a need for the development must be demonstrated.  For the same reason there is
some tension with policy GB 1 Green Belt. 
77. The only significant environmental effects which I identify (and in this respect I
disagree with the EIA report and subsequent updated landscape and visual assessment)
are the visual effects of the extension from some locations, including cumulative effects with
the extraction of the remainder of the quarry.  However I do not find that these give rise to
significant conflict with the development plan. 
78. In respect of the other main issues I identify, I conclude that there would be no other
significant environmental effects and no conflict with the development plan.  Overall, on
balance I find the proposal to be in accordance with the development plan.   
Other material considerations 
79. As I state at paragraph 15 above, I consider the proposed 2020 local development
plan, as modified, to be an important material consideration in this case. 
80. In respect of the need for the development, I note that policy MIN 1 Minerals and
Aggregates Extraction in the 2020 plan does not require evidence that there is a need or
market demand for a proposal to extract minerals.  This provides some counterweight to the
tension with the local plan policies which look for such evidence. 
81. The policy provision in the 2020 plan have similar aims to the 2010 local plan in
respect of the protection of residential amenity, nature conservation and path networks.  In
light of my findings above, I see no significant conflict with the 2020 plan in these respects. 
82. The policies in the 2020 plan also seek very similar outcomes in respect of
landscape character.  However policy MIN1 is more explicit in identifying visual impacts as
a consideration, saying that there should be ‘no significant negative impact on landscape,
including visual impact’.   
83. I identify above certain visual effects which I deem, in terms of the EIA Regulations,
to be significant environmental effects.  However that is a different undertaking from the
application of planning policy to a development proposal.  The visual effects of the
proposed extension alone are very localised, and such effects are to be expected from
most mineral developments.  The cumulative effects are greater in extent, but the extension

Page 14

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
14
proposal makes only a modest contribution to these.  Any tension with the requirements of
policy MIN 1 are not sufficient to outweigh my finding that the proposal is in overall
compliance with the statutory development plan.  
84. I take note of all the representations made to the council and to DPEA, both in
support of and in opposition to the development.  In the former category, many of the
representations point to the adverse effects of extraction in the excambion area.  These
effects are not ones which I can consider in any detail in this appeal, and they do not affect
my conclusions on the effects of mineral extraction on the appeal site. 
Overall conclusion 
85. Overall, I conclude, for the reasons set out above, that the proposed development
accords with the relevant provisions of the development plan and that there are no material
considerations which justify refusing to grant planning permission.  I have considered all
other matters raised, none of which lead me to alter my conclusions.  I am satisfied that my
reasoned conclusions on the significant environmental effects of the proposed development
are up to date. 
86. Accordingly, I will defer determination of this appeal for a period of up to twelve
weeks to enable the relevant planning obligation (either an agreement with the planning
authority or a unilateral obligation by the appellant under section 75 of the Town and
Country Planning (Scotland) Act 1997 or some suitable alternative arrangement as may be
agreed by the parties) to be completed and registered or recorded, as the case may be,
securing a bond sufficient to cover the expected restoration and aftercare works for the
quarry extension.  The principal of such a bond had been agreed by between the appellant
and council officials, and I agree that it is necessary to ensure that the quarry extension site
is restored after it has been worked.  If, by the end of the twelve week period, a copy of the
relevant obligation with evidence of registration or recording has not been submitted to this
office, I will consider whether planning permission should be refused or granted without a
planning obligation. 
87. The council provided a set of proposed conditions to be imposed should the appeal
be allowed.  These are very similar to the ROMP conditions for the main part of the quarry. 
For the most part I propose to impose those conditions, giving much the same reasons as
the council gave for the ROMP conditions.  I have amended proposed condition 5 to better
match the equivalent ROMP condition.  The council’s proposed conditions 19 and 20 relate
to the main quarry road and to wheel washing of vehicles leaving the quarry. 
Notwithstanding the council’s view, I do not think they are necessary for the appeal
development, and I would omit them.  I am not aware of any statutory requirement that the
proposed development need commence within two years, therefore I would omit the
council’s proposed first condition.  If there is such a statutory requirement, this would
endure regardless of the omission of the condition.  I have amended Table A – Noise
Criteria for condition 4 to clarify what noise index is to be used.  I have made slight
adjustments so that the numbering of equivalent conditions for the extension and the main
quarry are aligned. 
David Liddell
Reporter

Page 15

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
15
Schedule 1: Proposed Conditions 
1.  [Not used] 
2. The development hereby approved shall endure until 21 February 2042 and at the
end of the period of permission all quarrying operations, including the crushing of rock and
the transfer of aggregates from the site, shall cease. 
Reason: In order that the timeframe of this permission aligns with that of the main quarry. 
3. Subject to the details specified in subsections 3(a)-3(b) below, the normal daytime
operating hours for the quarry shall be 0600 hours to 2200 hours daily and no operations
other than emergency works, water pumping, servicing, maintenance and testing of plant
shall take place outside these hours. 
3(a)  Outwith 0700 hours to 1900 hours Monday to Friday and 0700 hours to 1400 hours
on Saturday and Sundays, with the exception of haulage vehicles entering and leaving the
site, all operations shall be undertaken below ground level within the quarry void. 
3(b)  Loading and despatch of aggregates for specific contracts may be undertaken
outwith the specified hours where no less than 24 hours written notice (excluding weekend
days and public holidays) has been given to the Planning Authority. 
Reason: To retain control over future quarrying operations of the site, in the interests of the
amenity of the area. 
4.  Noise attributable to the operators at Sheephill quarry shall not exceed the limits
specified in Table A (Noise Criteria) attached to this permission at Greenland Farm,
Auchentorlie House, No. 9 Milton Hill, and Middleton. 
Reason: To minimise noise nuisance, in the interests of the amenity of the area. 
5.  Advance notification of a minimum of 48 hours for the relaxation of the noise limits
identified in condition 4 above for soils and overburden operations to be undertaken shall
be given to the Planning Authority. 
Reason: To retain control over the future operations on site, in the interests of amenity of
the area. 
6. The applicant shall undertake a noise monitoring programme at the locations as
described in condition 4 above and the frequency and times of such monitoring shall be
agreed by the Planning Authority and the results shall be submitted in writing to the
Planning Authority on a frequency to be agreed with the Authority.  The noise monitoring
shall be carried out in accordance with the methods specified in PAN50: Annex A - The
Control of Noise at Surface Mineral Working and in so far as is reasonably practical, the
operation shall ensure that the best practice methodologies set out in PAN50 are adopted. 
Reason: To limit noise nuisance, in the interests of the amenity of the area 
7.  Blasting operations shall be carried out between 1000 and 1600 hours Monday to
Friday, with no blasting permitted at weekends and on public holidays and the quarry

Page 16

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
16
operator shall endeavour to ensure that, as far as is practicable, blasting shall be carried
out between 1000 and 1300 hours. 
Reason: To limit the impact of noise nuisance, in the interests of the amenity of the area. 
8.  Prior to the commencement of blasting operations details of the methods employed
to minimise air overpressure from blasting operations shall be submitted to the Planning
Authority for written approval.  All blasting operations shall take place only in accordance
with the scheme as approved or with such subsequent amendments as may receive the
written approval of the Planning Authority. 
Reason: In order to control noise nuisance, in the interests of the amenity of the area. 
9.  Notwithstanding the requirements of condition 7 and 8 above, if as a result of any
emergency situation or need to ensure safe quarry practices, blasting is required to take
place outside the specified hours, the times and reasons for such an event shall be notified
in writing to the council’s Environmental Health Service within two days of the occurrence. 
Reason: In order to control noise nuisance, in the interests of the amenity of the area. 
10.  Within four weeks of the date of this approval, the operator shall submit a blast
monitoring scheme that will record all blasts within the quarry area, with the monitoring
points to be set at locations to be agreed by the Planning Authority. 
Reason: In order to control noise nuisance, in the interest of the amenity of the area. 
11.  The operator shall monitor all blasts and records shall be maintained so that peak
particle velocity can be identified and these records shall be made available for inspection
by any authorised party during office hours at the quarry with copies being supplied to the
Planning Authority on a three monthly basis.  In the event that recorded values exceed the
agreed level the operator shall notify the Planning Authority of the event within one working
day and shall provide an assessment of its implication with respect to future blasting activity
and the site’s vibration limit. 
Reason: In order to control noise nuisance, in the interest of the amenity of the area. 
12.  Ground vibration as a result of blasting operations shall not exceed a peak particle
velocity of 6 mm/s in 95% of all blasts measured over any period of twelve months and no
individual blast shall exceed a peak particle velocity of 12 mm/s as measured at any nearby
vibration sensitive property.  The measurement shall be the maximum of three mutually
perpendicular directions taken at the ground surface at any vibration sensitive building; all
to the satisfaction of the Planning Authority. 
Reason: In order to control noise nuisance, in the interest of the amenity of the area. 
13.  Blasting shall be carried out using the best practicable means available to ensure
that the resultant noise, vibration and air overpressure are minimised in accordance with
current British Standards and Mineral Guidelines and the best practice methodologies as
set out in PAN 50.

Page 17

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
17
Reason: In order to control noise and vibration nuisance, in the interest of the amenity of
the area. 
14.  For the duration of this permission and up to the completion of all aftercare works
warning signs shall be erected and maintained by the operator next to all publicly
accessible areas within or adjacent to the quarry.  Details of the locations of these signs
shall be submitted to and approved by the Planning Authority. 
Reason: To allow safe access, in the interests of public safety. 
15.  Blasting shall only be carried out after suitable audible and visible warnings have
been given and the method of such warnings shall be submitted to the Planning Authority. 
Thereafter the approved warnings shall be given in writing by the operator to the occupiers
of all the properties around the site. 
Reason: In the interests of public safety. 
16.  The operator shall ensure that the Council’s Environmental Health Service be given
a minimum of 48 hours email notification, excluding weekends and public holidays, before
every blast at the quarry. 
Reason: In order to provide adequate notice for Environmental Health Service to allow the
monitoring of blasting operations. 
17.  The quarry operator shall ensure that all operations are controlled so as to prevent or
minimise the release of dust into the atmosphere and the dust mitigation measures listed in
the Environmental Statement shall be implemented and in a method which ensures that the
best practice methodologies as set out in PAN50 are adopted. 
Reason: In order minimise dust from the quarry operations, in the interests of the amenity of
the area. 
18.  Visual assessments of dust emissions from all plant and operations shall be made at
least once per day during operations and remedial actions taken as may be required.  The
operator shall maintain a diary of weather conditions, visual assessment of dust and any
mitigation measures implemented on a daily basis.  The diary shall also record any
complaints relating to dust, any investigations undertaken in respect of complaints and any
remedial actions undertaken as a result of the investigation.  The diary shall be retained on-
site and made available to the Planning Authority on request. 
Reason: In order minimise dust from the quarry operations, in the interests of the amenity of
the area. 
19.  [Not used] 
20.  [Not used] 
21.  Within three months of the date of this consent an updated plan and programme of
the anticipated phasing of the extension quarry operations shall be submitted and approved
by the Planning Authority.  Any changes to the approved phasing programme and plan shall
be notified and approved by the Planning Authority.

Page 18

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
18 
Reason: To retain control over future quarrying and operations of the site, in the interests of
the amenity of the area 
22.  The methods of working within the quarry shall be as described within the
approved documents forming part of this consent and any changes to the operating
procedures or methods shall be submitted to and approved in writing by the Planning
Authority and shall be implemented as approved. 
Reason: To retain control over future quarrying and operations of the site, in the interests of
the amenity of the area. 
23.  The topsoil and subsoils to be removed shall be stored as described in the
applicant’s written submission and shall be retained on site for eventual reuse as part of the
restoration works as described in condition 31. 
Reason: To retain control over materials for the future restoration on site. 
24.  If it becomes necessary to relocate any of the existing or new soil storage mounds
within the site then such soils cannot be relocated until the Planning Authority gives written
approval of the new storage locations and methods of storage. 
Reason: To retain control over materials for the future restoration on site. 
25.  If it becomes necessary to relocate the mineral stock piles from the location indicated
in the applicant's submission, then such relocation cannot take place until the Planning
Authority gives written approval of the new storage locations and methods of storage. 
Reason: To retain control over the future operations on site, in the interests of amenity of
the area. 
26.  Details of any boundary walls and fences to be erected for the full extent of the
application site shall be submitted to and approved in writing by the Planning Authority and
shall be implemented as approved. 
Reason: To retain control over the future operations on site, in the interests of the amenity
of the area. 
27.  No materials shall be imported to the site for the purposes of storage, crushing,
screening, processing, manufacturing or onward transportation. 
Reason: To retain control over the future operations on site, in the interests of amenity of
the area. 
28.  Any chemical, oil or diesel storage tanks installed within the application site shall be
sited on impervious bases and surrounded by impervious bunded walls and the bunded
areas shall be capable of containing 110% of the tank volume and should enclose all fill and
draw pipes. 
Reason: To prevent environmental pollution, in the interests of public safety.

Page 19

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
19
29.  All artificial lighting units installed at the quarry shall have a purpose and shall be so
sited and directed as to minimise the potential for light pollution and glare outside the quarry
boundary. 
Reason: To prevent light pollution, in the interests of the amenity of the area 
30.  No later than six months after the permanent cessation of quarrying or the date set
by condition 2 above, whichever is the sooner, all buildings, plant, machinery and areas of
hardstanding including the internal access roads shall be removed and the ground
reinstated in accordance with the conditions of this permission relating to restoration. 
Reason: In order to retain effective control over quarry operations, in the interest of the
amenity of the area. 
31.  Within six months of the date of this consent, a restoration masterplan for the whole
of the quarry area and including details of the restoration or replanting of dilapidated
features such as boundary hedges and drystone dykes, as well as details showing how
recreational access and links to the local path network would be achieved, along with
details of aftercare and afteruse, shall be submitted to and approved in writing by the
Planning Authority.  This shall include how the restoration of the extension area is
integrated within the overall restoration proposals of the full quarry area. 
Reason: To ensure the satisfactory restoration of the quarry site. 
32.  Not later than two years before the expiry of this permission or permanent cessation
of quarrying, whichever is the sooner, a detailed final restoration scheme for the site
including aftercare and maintenance shall be submitted for the written approval of the
Planning Authority.  The approved scheme shall be implemented before the expiry of this
permission. 
Reason: To ensure the satisfactory restoration of the quarry site. 
33.  The restoration scheme approved under the terms of condition 32 above shall
include a bird hazard management plan to be approved in writing by the Planning Authority
in consultation with Glasgow Airport.  The submitted plan shall include details of the design,
maintenance and management of any water bodies and wetlands to minimize birdstrike
hazard. 
Reason: To ensure restoration proposals do not cause operational issues for Glasgow
Airport. 
34.  The restoration scheme approved under the terms of condition 32 above shall be
implemented and the works completed within twelve months of the completion of all
quarrying operations or the date stated in condition 2 above, whichever is the sooner. 
Reason: To ensure the satisfactory restoration of the quarry site. 
35.  In the event that during the life of this permission mineral extraction ceases for a
continuous period in excess of two years or the use is discontinued for a like period, then
unless as may otherwise be agreed in writing by the Planning Authority, within six months
of either event occurring, a revised final restoration scheme that modifies and updates that

Page 20

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
20
approved by condition 32 above, shall be submitted for the written approval of the Planning
Authority, including any modifications as may be required, detailing the steps to be taken to
restore the site. 
Reason: In order to retain effective control of the future restoration of the quarry site and to
ensure an acceptable restoration scheme. 
36.  Within six months of being approved any revised restoration scheme that may have
been required under the terms of condition 35 above shall be implemented and the works
completed. 
Reason: In order to retain effective control of the future restoration of the quarry site. 
37.  The approved aftercare scheme shall be implemented following cessation of mineral
extraction and in accordance with the approved timetable as required by condition 35
above, unless as may otherwise be agreed in writing by the Planning Authority. 
Reason: To ensure the satisfactory restoration of the quarry site. 
38.  Within twelve months from the date of this permission, and thereafter at twelve
monthly intervals, the applicant shall submit a plan to a scale of not less than 1:2500
indicating the progress of quarrying operations.  The plan will indicate the current position of
the extraction areas, the extent of spoil disposal and any landscaping or restoration works
that have been implemented. 
Reason: In order to retain effective control of quarry operations in the site, in the interests of
the amenity of the area. 
39.  Prior to any tree felling work taking place, all trees that require to be felled shall be
inspected by an experienced bat surveyor to check for the presence or otherwise of bats.  If
bats are found then no tree felling work shall take place until the relevant licence is
obtained. 
Reason: In the interests of protecting wildlife species. 
40.  The applicant shall ensure that the footpath from Milton Brae via Greenland
Farm to Loch Humphrey, where it passes close to the quarry, is kept open to the public
(other than during any times of blasting in the quarry) or that an alternative appropriate
footpath is provided. 
Reason: In order to allow safe access, in the interests of public safety. 
41.  No development shall commence on the extension area, including any soil stripping,
until an updated ecological survey has taken place.  The ecological report shall be
submitted to and approved by the Planning Authority.  In the event of any protected species
being identified no works shall be undertaken within the identified area until appropriate
mitigation measures have been submitted to and approved by the Planning Authority and
the approved mitigation measures implemented on site. 
Reason: In order to protect wildlife in the interests of the amenity of the area.

Page 21

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
21
42.  No development shall take place within the development site until the developer has
secured the implementation of a programme of archaeological works in accordance with the
written scheme of investigation which has been submitted for approval of the Planning
Authority.  Thereafter the developer shall ensure that the programme of archaeological
works is fully implemented and that all recording and recovery of archaeological resources
within the site is undertaken to the satisfaction of the Planning Authority in consultation with
West of Scotland Archaeology Service. 
Reason: In order to protect any archaeological heritage/ features within the site. 
Table A – Noise Criteria – Condition 4 
Receptor  Noise Criteria 
Extension 
Soils and
overburden
handling*
Routine
operations
Including drilling
Routine
operations 
Out of hours
operations**
Milton Hill 70 55 55 42
Greenland 70 55 55 55
Middleton 70 48# 45 42
Auchentorlie 70 49 49 42 
All figures are in decibels LAeq,1hr
* For a period of up to eight weeks in any twelve month period. The temporary works shall
not start until 0800 hours and not on Sundays or Bank Holidays.
# Only when drilling to upper bench, 45dB for all other benches.
** Out of hours operations are those outwith 0700 hours to 1900 hours Monday to Friday and
0700 hours to 1400 hours on Saturday, and include Bank Holidays. 
Schedule 2:  Application drawings 
Figure 1 - Site Location Plan, 20 March 2003
Figure 2 - Existing Topography, 20 March 2003
Figure 3 - Development Plan, 20 March 2003
Figure 4 – X-Section, 20 March 2003
Figure 5 - Excavation Boundary Following Excambion, 20 March 2003
Figure RevRest0404 – Indicative Restoration Plan, 7 April 2004
Figure SH04/04a – Excavation Boundary Following Excambion, 7 April 2004
Figure SH04/04b - X-section B, 7 April 2004