WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Regulatory and Regeneration 
Planning Committee: 8th October 2021
_____________________________________________________________ 
DC21/138/FUL:  Proposed residential redevelopment of 88 dwellings
comprising of cottage flats, bungalows and flats with
vehicular access, associated car parking and landscape
works at land at the corner of Glasgow Road and Mill
Road, Clydebank by West Dunbartonshire Council 
1. REASON FOR REPORT 
1.1 This application relates to a major development and under the terms of the
approved Scheme of Delegation it therefore requires to be determined by
the Planning Committee. 
2. RECOMMENDATION 
2.1 Grant full planning permission subject to the conditions set out in Section
9.   
3. DEVELOPMENT DETAILS
3.1    The site is located at the corner of the junction of Glasgow Road and Mill
Road, Clydebank. Glasgow Road forms the site’s southern boundary and
Mill Road runs along the site’s eastern boundary. Mill Road marks West
Dunbartonshire’s boundary with Glasgow City Council. To the site’s
northern boundary is the railway line and Yoker train station which has a
small car parking area accessed off Mill Road. There is a bus stop directly
adjacent to the site’s access on Mill Road and to the south there is a bus
stop on Glasgow Road. On the eastern side of Mill Road, opposite the
application site is a supermarket. To the site’s  western boundary there are
a number of light industrial units that accommodate car
workshops/garages and printers and are accessed off Hamilton Street.
There is a also a parade of shops to the site’s western boundary and there
is direct access to these amenities from  the application site through
Hamilton Terrace. The site is broadly rectangular and flat. There are 
mature trees located on the south-eastern corner of the site. Within the
site itself there is an existing Scottish Water trunk sewer that runs north to
south though the site to the western side of the site. There is also a

Page 2

Scottish Water below ground storage facility along part of the boundary
with Glasgow Road.  
3.2  Planning permission is sought for  88 dwellings in total comprising of 38
houses and 50 flats. The dwelling sizes range from two to five bedrooms
and the proposed flats are one and two bedrooms. Nine wheelchair
accessible properties are proposed across the site. Access to the site
makes use of the existing vehicle access from Mill Road. The proposed
internal road layout takes the form of circulatory road that follows the
broadly rectangular form of the site. Within the circulatory road there are
blocks of terrace houses that are sited close to the road edge to form a
strong building line. Private garden grounds and car parking is proposed to
the rear of these houses with a secondary mews type road running
between these spaces. To the north of the circulatory road there are a mix
of houses and cottage flats. The cottage flats face in to a semi public
landscaped area. The gables of these properties face the railway line in
order partly to address railway noise and provide opportunity for views in
to the site. 
3.3   At the site’s north-western corner the proposal includes a large area of
open space with tree planting and wildflower planting. There are 3
bungalows proposed that have views to the open space and  there are two
blocks of terrace houses proposed that face on to Glasgow Road. These
properties have private gardens and car parking to the rear and are
accessed off the main circulatory road. Landscaping is proposed in front of
these houses to provide a visual buffer to Glasgow Road and setting to the
development. In between these two housing blocks a significant
landscaped area is also proposed. The layout partly responds to the
underground constraints but will provide high quality landscaped areas
that provides opportunities for movement through the site from Glasgow
Road and beyond and provides a high quality natural residential
environment. 
3.4   On the corner adjacent to Glasgow Road and Mill Road the scale of the
development increases to four storey blocks of flats that then further
increases to a six storey block. These taller buildings represent a
distinctive landmark building and incorporate a ‘saw tooth’ roof form that
accentuates the height and verticality further. The proposed layout
includes urban street planting to this corner facing the public elevations
and private space with car parking, cycle and refuse storage to the rear.
Within the site the house designs are simple in form making use of active
gable ends to add visual interest and passive surveillance of surrounding
streets. The saw tooth roof feature is also incorporated in to the house
type designs. Finishes proposed include dark grey windows and a mix of
dark grey and buff bricks. Recessed entrances to feature a black glazed
brick and soldier brick courses also add some visual interest and texture to
the dwellings. A similar materials pallete is proposed for the taller flatted

Page 3

part of the development and their design will include the use of a darker
brick for the ground level and metal ‘zig zag’ shape to be included on the
window railings, again large window openings are also proposed. A simple
window design which repeats across the taller blocks of flats also unifies
the flatted development and similar, generous window opening feature on
the houses around the rest of the site. 
3.5 Supporting technical information has been provided as part of the
application and this includes a Design and Access Statement, a Pre-
application Consultation Report, Phase 2 Site Investigation, and Transport
Statement. 
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have raised no objections
provided that a further review of car parking provision can be undertaken
upon full occupation and that further car parking spaces can be formed if
necessary. 
4.2        West Dunbartonshire Council Environmental Health has raised no
objections in principle but requested conditions with respect to
contaminated land, SUDS and maintenance, Noise Impact Assessment
and required mitigation measures, construction noise, piling method
statement, dust control and storage of waste. 
4.3       West Dunbartonshire Council  Biodiversity Officer, Waste Services and
Scottish Water  have raised no objections to the proposed development.  
4.4  Network Rail advise of no issues in principle but would wish to see the
provision of a suitable trespass fence of at least 1.8m in height along the
sites northern boundary.  
4.5 Glasgow Airport Safeguarding has raised no objection, having now
considered the submitted Glint and Glare Assessment. A condition is
however recommended with respect to landscape species. 
4.6      Glasgow City Council have not responded at the time of writing this report.
5. REPRESENTATIONS
5.1 One representation has been received with the focus of the comments
concerning the new bridge construction and the impact this could have on
the road infrastructure when combined with the construction of 88
dwellings within close proximity. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN

Page 4

West Dunbartonshire Adopted Local Plan 2010 
6.1  Policy UR1 encourages the redevelopment and re-use of underused,
vacant and/or derelict land and buildings for appropriate uses such as
housing. Policy H4 sets out standards expected of residential
development, requiring high quality design in the range of house types
and sizes and in terms of form, layout and materials. Policy GD1 seeks to
ensure that all new development is of a high quality of design and
respects the character and amenity of the area. 
6.2 Policy R2 specifies the open space provision required for all
developments. Assessment of open space requirements has been
undertaken against the more updated “Our Green Network” Planning
Guidance (2015) in Section 7 below.   
6.3  Policy T1 and T4 requires sites to integrated with sustainable travel and
Policy E5 relates to trees and requires new development proposals to
consider impacts on trees and incorporate suitable tree planting. Policies
F1 and F2 aims to ensure that new development is not at risk from, and
does not increase the risk of flooding, and has suitable SUDS drainage
infrastructure. The proposal complies with the policies of the adopted local
plan and is assessed fully in Section 7 below. 
7.  ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP1) Proposed Plan
7.1  On 27 April 2016, the Planning Committee took a final decision not to
accept the Local Development Plan Examination Report recommended
modification in respect of including the Duntiglennan Fields site in
Clydebank as a housing development opportunity, and therefore, as a
result of the Scottish Ministers’ Direction, the Local Development Plan has
remained unadopted but continues to be a material consideration in the
determination of planning applications. 
7.2   The consideration of policies DS1, GN2, SD1, DS6 and GN3 and GN5
with regards to new residential development, green network, transport,
flooding and drainage are similar to that of the Adopted Plan.  DS7
requires any potential site contamination issues to be addressed and DS3
requires significant travel generating uses to be located within 400 metres
of a public transport network. DS1 seeks to ensure a high design quality in
housing and being suitable for a mix of occupants. 
7.3 The Residential Development: Principles of Good Design Guidance
applies to all developments of more than 3 units and has been taken
account of in the proposed design and site layout. The proposed
development is assessed against the Proposed Plan and the Residential
Development Guidance in Section 7 below.

Page 5

West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.4 The modified LDP2 was approved by the Council in August 2020 and the
Council then advised the Scottish Ministers of its intention to adopt the
Plan. The Scottish Government issued a direction to the Council on 18th
December 2020 requiring modifications to the housing parts of LDP2.
None of the policies considered in the determination of these applications
is affected by the Direction. LDP2 is therefore the Council’s most up to
date policy position and has significant weight in the assessment and
determination of planning applications at this time. 
7.5 Similarly to Policy DS1 of LDP 1, Policy CP1 seeks to ensure that housing
is of a high quality, adaptable and is designed to be suitable for a mix of
occupants.  It indicates that all new development will be expected to
contribute towards creating successful places by having regard to the six
qualities of a successful place (distinctive, adaptable, resource efficient,
easy to get to/move around, safe and pleasant, and welcoming). 
7.6 Policy GI2, BE1, FCC1, ENV1, ENV4, ENV5 and ENV6 are similar to the
green network, built heritage, tree, water environment and flooding
policies of the Adopted and LDP 1 policies, albeit that Policy GI2 sets a
higher open space standard to that of the adopted Local Plan and LDP 1.
Policies CP2 requires the integration and consideration of green
infrastructure from the outset of the design process through to its
maintenance and stewardship of the resource. 
7.7 Policy CON1 requires that significant travel generating uses are designed
to encourage sustainable transport and Policy CON4 sets out a need for
all developments to install sufficient broadband provisions. Policy ENV8
requires developments to address air quality, lighting and noise as part of
the planning process, whilst policy ENV9 requires all potentially
contaminated sites to be remediated where necessary to ensure that the
site is suitable for the intended use. It is considered that the proposals
comply with the above policies as discussed below. 
Principle of Development
7.8  The site had previously accommodated three multi-storey blocks of flats
with some lower level maisonettes. There were circa. 330 dwellings across
the site but these had historically suffered with maintenance and repair
issues. It was agreed in November 2015 by the Council  to proceed with
the demolition of these blocks and work was completed last year on the
demolition and site clearance. The construction of new dwellings on a site
previously used for residential purposes is therefore acceptable in
principal and does not conflict with the land use policies of the adopted
and Proposed Plans.

Page 6

7.9  Compatibility with surrounding land uses
The site is surrounded by a range of existing land uses.  To the north of
the site is the main Glasgow to Balloch railway line and Yoker train station.
Mill Road and Glasgow Road form the site’s more public boundaries with a
supermarket store being on the opposite side of Mill Road. To the site’s
southern and western sites there are mix of commercial properties. The
site is also under the flight path to Glasgow airport and therefore has the
potential to be impacted by a number of noise sources. It is acknowledged
that the site had accommodated residential properties in the past but
these were much denser and with an entirely different layout. 
7.10 A Noise Impact Assessment and supplementary reports have been submitted as
part of the proposals and it makes recommendations with respect to mitigation
measures that should be incorporated in to the building construction. These
mitigation measures include the use of a higher performing type of glazing,
specific glazing combinations, use of attenuated trickle ventilation and the use of
tiles or other weatherproof outer sheeting for the proposed roofs.  A combination
of these measures will help to address rail, road and aircraft noise, as well as
commercial noise sources.  Having regard to the well established use of the site
for residential in the past and current construction methods to include the
aforementioned mitigation measures it is considered that the site remains
suitable for residential development. The measures necessary to mitigate the
noise sources can be secured by condition and are necessary for a site of such
urban character. 
Site Layout, Design and Appearance
7.11  The layout has been the subject to extensive pre-application discussion
with suggested layout changes having been incorporated in to the final
submission. The development has been designed to reflect and
complement its surroundings but to also act as a landmark feature to
announce the arrival in West Dunbartonshire as it is on the Council
boundary between West Dunbartonshire and Glasgow City Council.   
7.12            The nature of the proposal is broadly described at paragraphs 3.2-3.4
above.  The proposed layout uses a circulatory road within the centre of
the site with an internal ‘mews’ style road sitting in the centre that allows
easy movement through for pedestrians and cyclists. A range of house
types are orientated and sited around the edge of the site to make the
most of their location and to add interest and variation to the streets. At
the north western corner of the site is an existing mound of contaminated
land that would be cost prohibitive to remove from the site.  It is intended
to securely cap this area and cover with a 450mm deep layer of clean soil
and introduce wildflower planting which is considered an appropriate
response to the  constraint on site. 
7.13             Design  of the houses and flats take advantage of its prominent location
whilst reflecting the constraints within and alongside the site. The corner
flatted development features a ‘saw  tooth’  roof  and taller window form to

Page 7

create a degree of dominance to the corner. The repeated window
arrangement is also a strong design element when read alongside the
proposed recessed entrance features. Soldier brick courses, deep window
reveals and zig zag metal railings also add interest to the flats and are
features that are repeated on the  houses and cottage flats within the site.
A mix of  materials is proposed across the site with bricks that have a buff
and dark grey tone that will complement each other and provide an
attractive contrast within the site together with a high quality black glazed
brick which will be used in recessed entrances. Concrete dark grey roof
tiles are also proposed and will blend with the brick choices.  The
fenestration will have  matt dark grey frames and the Juliet balconies that
feature on the taller flats will be matt dark grey too with a ‘zig zag’ shape
too add more visual interest.  
7.14 It is considered that the proposed layout responds well to the site
constraints and will create a landmark building to mark the arrival in to
West Dunbartonshire. The layout is imaginative and will provide a range of
housing options using high quality materials and represents a well
considered design solution and placemaking approach.   
Open Space and Landscaping
7.15     The presence of the main Scottish Water sewer and the underground
storage facility along Glasgow Road has resulted in  generous areas of
landscaping and open space. The proposed amenity space equates to
over 7800 sqm which exceeds the requirements of ‘Our Green Network
Planning Guidance.’ The amenity areas take a number of different forms.
There  are spaces provided to the rear of the flats for communal amenity
purposes, there are more open landscaped areas that will face Glasgow
Road and the land in the northern corner will also provide a valuable
green space and setting for the development. Individual houses and the
bungalows will also have their own private and defined garden space
which are considered to be commensurate with the amenity needs of each
dwelling type. High quality landscaping suited to the setting of the
development will also be provided and includes a range of treatments
across the site including the use of wildflower meadow grass planting to
the  earth mound to the north-western corner.  Other areas will be formally
planted with amenity shrubs, hedges and tree planting and species will be
selected to add to the sites biodiversity value. Native trees will also be
selected  and bulb and wildflowers will also feature to add seasonal
interest. The landscaping will also include swales and rainwater gardens
to help to manage rainwater runoff. It is envisaged that the required play
space can be located at various locations within the site along with public
art and these requirements can be addressed via conditions.

Page 8

7.16       The proposed layout does result in the loss of existing trees at the corner
of Glasgow Road and Mill Road. In total 18 trees across the whole site
will be removed as part of the development. The loss of the existing trees
at the site’s southwestern corner is unfortunate but necessary to create
the landmark building and the siting it requires to maximise its visual
impact. The proposed landscape plans illustrate that heavy standard
trees will be planted along the street edge with Mill Road and Glasgow
Road to create a strong green edge to the site. The landscape plans
indicate that over 80 trees will be planted on the site along with shrubs.
Quality landscape spaces are also proposed within other parts of the site
which will mitigate against the loss of the aforementioned trees on the
corner. It is felt that the levels of new planting across the site as part of a
well considered landscape approach with  trees having been selected
that are better suited to a new urban layout will provide a quality
landscape setting to the development that can not only be enjoyed by
residents but people passing through the development too.  The 
development will therefore have an attractive green setting which is
welcomed given the site’s  urban surroundings           
Roads, Parking, Access and Permeability
7.17 The site is well connected with bus routes along Mill Road and Glasgow
Road. Yoker train station adjoins the site  and established cycle routes run
parallel to Glasgow Road. It should also be noted that the new
Renfrew/Clyde  Bridge will also be built within close proximity to the
application site. A  total of 79 car parking spaces are proposed which is 
slightly below the standard required for this type of development. The
submitted Transport Statement provides justification for the reduced level
based on the profile and habits of future residents and the sustainable
location. Given the highly sustainable location of the site and the
submission of supporting information the number of car parking spaces is
considered acceptable by the Roads Service. If the needs of the residents
change as the development is occupied then functioning additional spaces
can be provided. This can be achieved via a planning condition.   
7.18           The development will also be providing electric vehicle charging points
and cycle storage for the flats. Accessible spaces are also included in the
layout for the residents of the wheelchair accessible dwellings. In terms
of the layout it is anticipated that the layout would create a ‘shared zone’
where the road network is shared by vehicles, cyclists and pedestrians
with the aim being to prioritise people over car users. The layout provides
links through the site to Yoker train station and the location of the new
Renfrew Bridge which will increase the permeability through the site and
create new pedestrian movements through the site.

Page 9

Technical Matters
7.19 The Council’s Environmental Health Service have requested a site
investigation report including remediation and mitigation measures for
treatment of the ground conditions. These matters alongside other
matters including  dust mitigation and construction activity can be
addressed as planning conditions. It should be noted that the
contaminated land to the site’s north-western corner is to be capped and
soil to a depth of 450mm shall be added. Thereafter the mound will
treated with wildflower planting mix to enhance the visual impact. This
approach is considered to be acceptable.   
7.20           In support of the application a Flood Risk Assessment, Energies
Strategy, Invasive Weed Strategy, Ecological Survey Report, Drainage
strategy to include SUDS and Reflectivity Analysis Report have been
submitted. The Council’s Road Service have advised that the findings of
the Flood Risk Assessment is acceptable and will not present a flood risk
to residents and the surroundings. The SUDS design includes swales
and rainwater gardens to manage rainwater runoff from hard surfaces.
This approach to SUDS being integrated in to the landscaping proposal
is a welcome response given the urban nature of the site. 
Pre-application Consultation
7.21 As the proposal constitutes a major development, statutory pre-application
consultation was carried out prior to the submission of the application. A
Proposal of Application Notice was received in February 2019 regarding
the redevelopment of the site.  Given that two years had lapsed since the
original Proposal of Application Notice process started and the scheme
has evolved, further engagement with the local community on the revised
proposals took place recently. The applicant has subsequently submitted
a Public Consultation Report which identifies that an online 
consultation/information event was held on 17th February 2021. This event
comprised of a presentation and participants had the opportunity to ask
questions. The event was publicised on the Council’s website, Facebook
page and tenant participation Facebook pages. In addition to the statutory
requirements
As a response of these public discussion forums lifts were introduced to all
closes of the flatted blocks which includes the four storey blocks, they had
previously only been in the six storey blocks. 
Place and Design Panel and Pre application Elected Member Briefing 
7.22  The development  has evolved over the last three years. Earlier versions
of  layouts and early capacity studies were presented to the Place and
Design Panel in September 2018. The Panel were of the view that the
urban setting would not lend itself to supporting detached suburban type
development that might lose its scale on the site but would perhaps be
suited to town houses and flatted development which would allow the

Page 10

volume to change across the site. The concepts discussed at the Panel
session are evident in the current layout. 
7.23  The application was also presented to a pre application Elected Member
Briefing on 30th March 2021. The Elected Member Briefing raised matters
concerning accessibility and lift access, sustainability aspects, zero carbon
approach as renewable energy sources and the use of triple glazing.
These issues have been addressed in the final submission.
8. CONCLUSION
8.1 The redevelopment of this vacant and brownfield  site for residential
purposes complies with local planning policies which seeks to support
urban renewal and regeneration. The proposals have been subject to
extensive discussions with officers at the pre-application stage and the
design of the site has clearly evolved through and been informed by the
feedback provided through this pre-application process, the Place and
Design Panel  and the separate Elected Member Briefing. The
development will provide high quality housing  with excellent open space
provision and connections to the surrounding area. The design and
prominence of the flatted development at the corner  between Mill Street
and Glasgow Road will be a bold landmark building and will enhance and
contribute positively to the further regeneration of the area.  
9. CONDITIONS 
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be
used for the dwellings/flats and associated hard landscaping, to
include boundary treatments and waste storage facilities within the
development site shall be submitted to and approved in writing by
the Planning Authority. For the avoidance of doubt the brick to be
used shall comprise of i) Ibstock Arden Weathered Grey, ii) Ibstock
Himley Ebony Black and iii) a glazed black brick. Full details the
proposed glazed black brick and its exact location for use on the
buildings shall be submitted to and agreed by the Planning Authority
prior to works commencing on site. The development shall be
completed in accordance with the approved material details and
palette unless otherwise agreed by the Planning Authority. 
2. Prior to the first occupation of the flats hereby approved details of
the proposed cycle storage and refuse/recycling stores shall be
submitted for the written approval of the Planning Authority. The
approved details shall be installed prior to the first occupation of the
flats hereby approved on an agreed phased basis. The constructed
cycle stores and refuse/recycling stores shall be maintained for the

Page 11

lifetime of the development unless otherwise agreed by the Planning
Authority. 
3. Prior to works commencing on site a proposed planting schedule to
include heavy standard tree planting shall be submitted for the
written approval of the Planning Authority to be read in conjunction
with the soft landscape arrangements approved under drawings XX –
DR-L-90-002 Rev A and XX-DR-L-90-001. The planting schedule
include native species and planting to increase the biodiversity value
of the site. The approved landscape plans shall be implemented no
later than the next available planting season or  a phased scheme to
be agreed with the Planning Authority. Any trees, shrubs or plants
forming part of the approved landscape scheme which die, are
removed or become seriously damaged or diseased, within a period
of 5 years from the date of their planting, shall be replaced in the
next planting season with others of similar sizes and species unless
the Planning Authority gives written approval to any variation. The
landscaping arrangements as approved shall thereafter be
maintained in accordance with these details for the lifetime of the
development unless otherwise agreed  by the Planning Authority. 
It should be noted that the submitted landscape  details must comply
with Advice Note 3 ‘Potential Bird Hazards from Amenity
Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguarding.asp). 
No subsequent alterations to the approved landscaping scheme shall
take place unless submitted to and approved in writing by the
Planning Authority.   
4. Prior to works commencing on site details of a children’s play area to
be incorporated in to the site’s landscaping areas shall be submitted
for the written approval of the Planning Authority. The children’s play
shall be installed upon occupation of the 30th dwelling unless
otherwise agreed by the Planning Authority and shall be maintained
for the lifetime of the development unless otherwise agreed. 
5. Prior to works commencing on site details of public art  to be
incorporated in the site’s landscaping scheme shall be submitted for
the written approval of the Planning Authority. The agreed public art
shall be installed upon completion of the development and shall be
maintained for the lifetime of the development unless otherwise
agreed.

Page 12

6. No house/bungalow shall be occupied within the site until the vehicle
parking spaces associated with that house unit have been
constructed and provided within the site in accordance with
approved site layout (drawing no. ABC-XX-XX-DR-A-0010-Rev J –
Proposed site plan). The aforementioned parking shall thereafter be
retained and be capable of use at all times and shall not be removed
or altered without the prior written approval of the Planning
Authority. 
7. Twelve months after the full occupation of the dwellings hereby
approved a Transport Statement and survey findings shall be
submitted for the approval  of the Planning Authority. The required
submissions shall detail the use of the approved car parking
provision and if necessary shall provide details of additional spaces
to include location and a timescale for their implementation.
Thereafter the additional parking, if constructed, shall be retained
and be capable of use at all times and shall not be removed or
altered without the prior written approval of the Planning Authority. 
8. Prior to the commencement of development with the site, details of
the location and design of an electric charging point(s)/unit(s) to
serve the development shall be submitted to and approved in writing
by the Planning Authority. The approved car charging point(s)/unit(s)
and associated infrastructure shall thereafter be installed in
accordance with the approved details at a timescale agreed by the
Planning Authority and maintained as such thereafter. 
9. Prior to the occupation of the first unit within the site, the developer
shall install the necessary infrastructure to enable the full
development and all associated properties to be connected to the
existing fibre optic network, where available in West Dunbartonshire,
and in accordance with the relevant telecommunications provider’s
standards. 
10. Notwithstanding the plans hereby approved details of additional
horizontal traffic calming measures throughout the development site
shall be  submitted for the written approval of the Planning Authority.
The approved works shall be installed as agreed prior to the first
occupation of the unit hereby approved or an alternative timeframe
to be agreed by the Planning Authority. The constructed traffic
calming measures shall be maintained thereafter for the lifetime of
the development. 
11. Notwithstanding the plans hereby approved full details of the
junction between Mill Road, the development access and Yoker Train
Station shall be submitted for the written approval of the Planning
Authority. The works shall thereafter be carried out in accordance

Page 13

with the approved plans and maintained as such for the lifetime of
the development unless otherwise agreed. 
12. No development (other than investigative works) shall commence on
site until such time as a detailed report on the nature and extent of
any contamination of the site has been submitted to and approved in
writing by the Planning Authority. The report shall be prepared by a
suitably qualified person and shall include the following: 
a) A detailed site investigation identifying the extent, scale and
nature of contamination on the site (irrespective of whether this
contamination originates on the site) 
b) An assessment of the potential risks (where applicable) to:
a. Human health
b. Property (existing and proposed) including buildings, crops
and livestock, pets, woodland and service lines and pipes
c. Groundwater and surface waters
d. Ecological systems
e. Archaeological sites and ancient monuments 
c) An appraisal of remedial options, including a detailed remediation
strategy based on the preferred option. 
13. No development (other than investigative works) shall commence on
site until such time as a detailed remediation scheme for the site has
been submitted to and approved in writing by the Planning Authority.
The scheme shall be prepared by a suitably qualified person and
shall detail the measures necessary to bring the site to a condition
suitable for the intended use by removing unacceptable risks to
human health, buildings and other property, and the natural and
historical environment. The scheme shall include details of all works
to be undertaken, the remediation objectives and criteria, a timetable
of works and/or details of the phasing of works relative to the rest of
the development, and site management procedures. The scheme
shall ensure that upon completion of the remediation works the site
will not qualify as contaminated land under the Environmental
Protection Act 1990 Part IIA in relation to the intended use of the land
after remediation. 
14. The presence of any previously unexpected contamination that
becomes evident during the development of the site shall be
reported to the Planning Authority in writing within one week, and
work on the site shall cease. At this stage, if requested by the
Planning Authority, an appropriate investigation and risk assessment
shall be undertaken and a remediation scheme shall be submitted to

Page 14

and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be
implemented as approved. 
15. If the remediation plan requires it then a monitoring and maintenance
scheme  (including the  monitoring of the long-term effectiveness of
the proposed remediation) shall be submitted to and approved by the
Planning Authority. Any actions ongoing shall be implemented within
the timescale agreed by the Planning Authority in consultation with
Environmental Health. Following completion of the actions/measures
identified in the approved remediation scheme a further report which
demonstrates the effectiveness of the monitoring and maintenance
measures shall be submitted to and approved in writing by the
Planning Authority. 
16. If there is a requirement to either re-use site won material or to
import material then the assessment criteria and sampling frequency
that would adequately demonstrate its suitability for use shall be
submitted to and approved by the Planning Authority prior to any
material being re-used or imported.  In addition to this and in
accordance with BS3882:2015 and BS8601:2013, material to be used
in the top 300mm shall be free from metals, plastic, wood, glass,
tarmac, paper and odours. On completion of the works and at a time
and or phasing agreed by the Planning Authority the developer shall
submit a verification report containing details of the source of the
material and associated test results to demonstrate its suitability for
use.   
17. Prior to the commencement of development on site, details of the
Sustainable Urban Drainage System (SUDS) and its maintenance
following installation shall be submitted to and approved by the
Planning Authority. The SUDS shall be designed to ensure that
contaminants present on the site are not mobilised and that pollution
pathways are not created. The Sustainable Urban Drainage System
(SUDS) shall thereafter be formed and maintained on site in
accordance with the approved details. 
18. No development shall take place on site until such time as a suitably
updated noise impact assessment has been submitted to and
approved in writing by the Planning Authority. This noise impact
assessment shall include an assessment of the potential for
occupants of the development to experience noise nuisance arising
from nearby sources  including commercial premises, plant
noise.  Where a potential for noise disturbance is identified,

Page 15

proposals for the attenuation of that noise shall be submitted to and
approved in writing by the Planning Authority. Any such approved
noise attenuation scheme shall be implemented prior to the
development being brought into use and shall thereafter be retained
in accordance with the approved scheme. The noise impact
assessment and any recommendations in respect of attenuation
measures shall be prepared by a suitably qualified person. 
As this area is subject to noise from aircraft, assessment of this
source must be detailed within the Noise Impact Assessment
including detailed mitigation measures for this noise source. The
development will require high specification  acoustic roof insulation
as a minimum and double/triple glazing. 
19. No development shall commence on site until such time that a noise
assessment has been submitted and approved by the Planning
Authority in writing, The noise assessment shall determine the
impact of road traffic noise on the development using the principles
set out in ‘Calculation of Road Traffic Noise’ (DoT/Welsh Office,
HMSO, 1988) or by a method to be agreed by the Planning Authority.
The survey shall take cognisance of the Scottish Government
Document: “Technical Advice Note Assessment of Noise”. Where the
submitted report identifies potential noise disturbance, it shall
include a scheme for protecting residents of the proposed dwellings
from road traffic  noise. The scheme shall ensure that the internal
levels do not exceed 40dB daytime and 35 dB night time and the
external levels do not exceed 55dB daytime in any rear garden areas,
when measured as LAeq.T. The approved mitigation measures shall
be implemented prior to the first  occupation of the dwellings hereby
approved and shall be retained and maintained for the lifetime of the
development. 
20 No development shall commence until such time that details of noise
attenuation/soundproofing works have been submitted to and
approved in writing by the Planning Authority. The approved noise
attenuation/soundproofing measures shall be implemented prior to
the development being brought into use and shall thereafter be
retained in accordance with the approved scheme. 
21 Upon completion of the development hereby approved an
independently  Verification Report shall be submitted for the written
approval of the Planning Authority which shall demonstrate
compliance with noise conditions of this planning permission. The
report shall demonstrate that the projections as detailed within the
approved Noise Impact Assessment are reliable and mitigate the
noise sources.

Page 16

22 No development shall commence on site until such time as a noise
control method statement for the construction period has been
submitted to and approved in writing by the Planning Authority. This
statement shall identify likely sources of noise (including specific
noisy operations and items of plant/machinery), the anticipated
duration of any particularly noisy phases of the construction works,
and details of the proposed means of limiting the impact of these
noise-sensitive properties. The construction works shall thereafter
be carried out in accordance with the approved method statement
unless otherwise approved in writing by the Planning Authority. 
23 During the period of construction, all works and ancillary operations
which are audible at the site boundary (or at such other place(s) as
may first be agreed in writing by the Planning Authority), shall be
carried out between the following hours unless otherwise approved
in writing by the Planning Authority: 
• Mondays to Fridays: 0800-1800
• Saturdays: 0800-1300
• Sundays and public holidays: No working   
24. No piling works shall be carried out until a method statement has
been submitted to and approved in writing by the Planning Authority. 
This statement shall include an assessment of and take into account
the following: 
• The impact of the piling on surrounding properties. 
• Detail any procedures which are required to minimise the impact of
noise and vibrations on the occupants of surrounding properties. 
This statement as submitted shall be prepared by a suitably qualified
person and shall take into account the guidance contained in
BS6472:1984 ‘Evaluation of Human Response to Vibration of
Buildings’. The piling works shall thereafter be carried out in
accordance with the approved method statement until they are
completed on site. 
25. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for
the control and mitigation of dust has been submitted to and
approved in writing by the Planning Authority. The scheme shall
identify likely sources of dust arising from the development or its

Page 17

construction, and shall identify measures to prevent or limit the
occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust
generating activities commencing on site and shall be maintained
thereafter, unless otherwise approved by the Planning Authority.
26. Prior to the commencement of development on site, an Air Quality
Impact Assessment shall be submitted for the written approval of the
Planning Authority. The report should use a method based on the
principles set out in the Environmental Protection UK document
Development Control: Planning for Air Quality (2010 Update),
Scottish Government publication ‘Local Air Quality Management
Technical Guidance LAQM.TG (09) and ‘Delivering Cleaner Air for
Scotland – Guidance from Environmental Protection Scotland and
the RTPI Scotland – January 2017’. The recommendations within the
approved Air Quality Report shall be implemented prior to the first
occupation of the dwellings or an alternative timescale agreed by the
Planning Authority. 
27. Prior to work commencing details of the sites proposed lighting
scheme shall be submitted for the written approval of the Planning
Authority and should include details of lamp type and luminaire. The
lighting installation shall thereafter be carried out in accordance with
the approved details unless otherwise agreed by the Planning
Authority. 
28. No development shall commence on site until details for the storage
and the collection of waste arising from the development shall be
submitted to and approved in writing by the Planning Authority. The
agreed details shall be in place prior the occupation of the first
housing unit/property within the site and thereafter maintained for
the lifetime of the development. 
29. Should works commence on the development hereby approved after
the start of the next bat breeding season (April 2022) then a further
Bat Survey shall be undertaken and submitted for the written
approval of the Planning Authority. In the event that bats are
encountered during other works, all works should cease and Nature
Scot or a licenced ecologist contacted. 
Peter Hessett
Chief Officer – Regulatory and Regeneration

Page 18

Date: 6th October   2021 
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager
Email: Pamela.Clifford@west-dunbarton.gov.uk 
Appendix: Location Plan 
Background Papers:  1. Application forms and plans;
2. Consultation responses;                                          
3.        West Dunbartonshire Local Plan 2010;
4. West Dunbartonshire Local Development Plan
Proposed Plan; 
5. West Dunbartonshire Local Development Plan
2 Proposed Plan.
6. ‘Our Green Network’ Guidance
7.  Residential Development Design Guidance 
Wards affected:   Ward 6 - Clydebank  Waterfront